Status of Public Private Partnership (PPPs) Projects in Infrastructure (As on December 31- 2011) Completed Projects
S. No. 1 A. 1. 2. 3. 4. Project Name Department /Agency 3 Estimated Cost (Rs. in crores) 4 Structure BOT/BOOT etc. 5 Date of Completion 6 Remarks If any 7

2 Road Sector Karaunti Bridge, Pali District Strengthening & Improvement of Mangalwar Nimbaheada - Neemuch Road (km.40/0 to 50/0 Widening, Strengthening and Improvement of Kekri Nasirabad Road (SH-26) Km. 0/0 to 25/0 Improvement & Strengthening of Sirohi - Anadar Reodar - Mandar Road upto State Border (km.197/0 to 214/0)km.0/0 at Beawar Improvement of Sirohi Mandar - Deesa Road SH-27 upto State Border (km 214/0 to 268/400 Construction of submersible bridge by providing RCC Hume Pipe on existing causeway at Luni River on Jodhpur Balotra Guda Road SH-289 Improvement & strengthening of Hanumangarh Suratgarh Road via peelibanga (km. 0/0 to 26/0) Upgradation by Strengthening & Renewal of Kherwara - Dungarpur Road SH-10 (km 0/0 to 20/0) Km. 0/0 Start from Malai chouraha

PWD PWD PWD PWD

2.95 6.35 4.00 7.29

BOT BOT BOT BOT

25.02.1997 01.04.2000 10.02.1999 01.04.2002

Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government.

5. 6.

PWD PWD

26.01 4.00

BOT BOT

17.05.2003 10.06.2003

7. 8.

PWD PWD

10.24 3.69

BOT BOT

26.03.2001 18.02.2001

9.

10. 11. 12.

Strengthening, Widening & Improvement of road and reconstruction of narrow & weak culverts on Nathdwara - Mavali Road MDR-36(Km. 0/0 to 26/700 Km. 0/0.) Bharatpur Bye-Pass Construction of Udaipur Bye-pass Phase II Improvement of Alwar - Bhiwadi Road SH-25Km. 146/0 to 225/0

PWD

4.50

BOT

06.03.2002

Completed and handed over to Government.

PWD PWD PWD

13.25 23.99 18.62

BOT BOT BOT

12.04.2000 1997 09.06.2004

13. 14. 15. 16. 17. 18. 19. 20. 21.

Sikar Bye-Pass Improvment of Banswara - Udaipur Road SH-32 (Km 91/500 to 165/0) Strengthening of Banswara - Dahod Road (Km. 396/0 to 411/0 SH-4 Widening & Strengthening of Challa- Neem-ka-thana Kotputli Road SH- 13 &MDR- 25 (Km.60/800 to 125/0) Widening & Strengthening and Improvement of Mangalwar- Nimbahera Road (Km. 0/0 to 40/0) Construction of H.L. Bridge on River Massi (Km. 48/200 of Sanganer-Malpura Kekri Road) SH-12 Improvement of Manglana-Makrana Road (Km. 400/0 to 415/0) and Makrana-Bidiyad Road (Km. 0/0 to 6/0) Widening & Improvement of Dantiwara-Pipar City Merta City Road (Km 0/0 to 26/500) Construction of Four Lane Road with Median Strip of 1.2 Mtr. Wide on Bar-Bilara-Jodhpur Road SH-5 (Km.

PWD PWD PWD PWD PWD PWD PWD PWD PWD

13.75 11.50 2.65 64.20 10.26 1.94 6.54 5.47 8.93

BOT BOT BOT BOT BOT BOT BOT BOT BOT

15.01.2000 05.02.2002 04.11.2001 29.04.2005 01.03.2002 08.04.2002 21.04.2002 11.02.2002 24.07.2002

Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government. (Toll actually stopped on 16.10.2008 litigation pending). Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government. Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government
2

22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36.

90/0 to 105/0) Bharatpur-Mathura Bye pass SH-1 Kharka Bridge Udaipur (Bhinder-Salumber Road SH-53) Bondu Nallah Beedach Bridge Jojri River Bridge Bhilwara Bypass D' Zone Bypass Kherli Bridge Khatoli Bridge Sri Madhopur Bypass (SH) Kankroli Bypass (SH) Badgaon- Jaitpura Bridge (SH) Gangapur City Bypass (SH) Bikaner Bypass Morel Bridge (SH)

PWD PWD RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC

13.25 1.35 1.58 4.43 1.26 17.97 5.17 0.18 1.84 0.63 4.74 1.72 5.68 8.73 12.09

BOT BOT BOT BOT BOT BOT BOT BOT BOT BOT BOT BOT BOT BOT BOT

07.04.2008 01.08.1995 16.04.2009 25.08.1996 1996 05.07.2001 1999 01.04.1995 24.07.1997 03.11.1999 10.08.1998 01.04.1997 27.10.1999 15.12.1999 16.09.2002

Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government
3

37. 38. 39. 40. 41. 42. 43. 44.

Palighat Bridge (SH) Kharer- Banmi Bridge (SH) Jindoli Ghati Tunnel (SH) Kali Sindh Bridge (NH) Parvati Bridge (NH) Pali Bye-Pass (Beawar - Bar - Pali - Sirohi NH-14 Km. 106/0 to 112/0) Construction of Pali Bye-Pass on Jodhpur-Sumerpur Road NH-65 Km. 0/0 to 11/500 (0 at Km. 366/0) Improvement of Jhalawar-Indore Road SH-1A (Strengthening & Widening Km. 9/700 to 29/900) 6.0 Km. away from Patan to State Border Upgradation (Strengthening and Renewal) of SH-32 Udaipur-Salumber-Banswara Road (Km. 5/0 to 72/0) Widening & Strengthening of Shri Ganga NagarHanuman Garh Road SH-36 Km. 1/500 to 56/0 Construction of Nimbhahera Bye-pass on NH-79 (Ajmer-Bhilwara-Chittorgarh-Nimbahera-RatlamIndore Road) Km. 209/087 to 217/400 Widening & Strengthening of Sikar-Jhunjhunu-Loharu Road SH-8 Km. 0/0 to 119/700 Construction of Kelwa-Amet Road 0/0 to 18/0 Widening & Strengthening and Improvement of Nasirabad-Kekri-Deoli Road SH-26 Km. 25/0 to 56/500 Widening & Strengthening and Delhi-Ramgarh-Alwar Road (SH-13) Km. 125/400 to 160/300

RSRDC RSRDC RSRDC RSRDC RSRDC PWD PWD PWD

9.42 1.97 12.45 16.99 8.04 10.25 30.00 7.15

BOT BOT BOT BOT BOT BOT BOT BOT

01.04.1995 01.04.1996 16.05.2001 05.11.1997 1997 05.12.1998 04.05.2006 01.04.2002

Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Completed and handed over to Government Project completed and toll is on. Project completed and toll is on. Project completed and toll is on. Project completed and toll is on. Project completed and toll is on. Project is on. Project is on. Project is on. Project is on. completed and toll completed and toll completed and toll completed and toll
4

45. 46. 47.

PWD PWD PWD

13.57 16.03 31.48

BOT BOT BOT

02.06.2004 18.02.2005 18.05.2005

48. 49. 50. 51.

PWD PWD PWD PWD

49.78 5.70 21.40 25.28

BOT BOT BOT BOT

21.07.2004 05.05.2006 15.12.2006 19.04.2008

52. 53.

54. 55.

56. 57. 58. 59. 60. 61. 62. 63. 64.

Strengthening and Improvement of Riding Quality of Existing Bikaner Bye-Pass Road Km. 0/0 to 28/0 Widening & Improvement of Kama-Nand Goan-Kosi Road 56/200 to 64/200 and kama Bye Pass (SH-44) Kama Jurehera Punhana Road (MDR-72) Km. 0/0 to 20/0 and Kama Pahari Road (ODR-16) Km. 0/0 to 22/0 Widening & Strengthening of Nasirabad to Mangliawas Road Km. 0/0 to 24/200 (MDR-39) Strengthening, Widening & Improvement of riding Quality of Road Sirohi-Reodar-Mandar-Deesa Road (Up to Gujrat Border) SH-27 Km. 197/0 to 268/400 Hanuman Garh Suratgarh Raod including ROB and Hanumangarh (LC-71A) Chomu-Ajitgarh-Shahpura (Km. 0/0 to 50/500) Bikaner Bye-Pass Connecting NH-15 (BK-JSL) to NH-15 (BK-SGR) Km. 0/0 to 26/0 Phalodi to Ramgi ki Gol Hanumangarh to Kishangarh Alwar to Sikandra Baran to Jhalawar Lalsot to Kota Hanumangarh to Sangaria (upto Haryana Border)

PWD PWD

12.02 35.66

BOT BOT

09.05.2008 05.08.2009

Project completed and toll is on. Project completed and toll is on.

PWD PWD

21.52 133.79

BOT BOT

02.04.2009 2010

Project completed and toll is on. Project completed and toll is on. Project completed and toll is on. Project completed and toll is on. Project completed and toll is on. Project completed and toll is on. Indicated tolling period is 30 years. Tolling will commence uptill repayment of loan thereafter GoR to take a decision on utilization of surplus in SRF or development of other Roads. Project completed and toll is on. Indicated tolling period is 30 years. Tolling will commence uptill repayment of loan thereafter
5

RSRDC RSRDC RSRDC RIDCOR RIDCOR RIDCOR RIDCOR RIDCOR RIDCOR

39.90 38.38 41.69 386.30 627.20 128.10 111.70 303.70 51.40

BOT BOT BOT BOT BOT BOT BOT BOT BOT

01.07.2006 01.04.2007 31.12.2009 28.12.2007 28.02.2008 31.08.2008 15.04.2008 15.12.2008 01.11.2011

GoR to take a decision on utilization of surplus in SRF or development of other Roads. Sub Total (A) (B) 1. Urban Infrastructure Common Bio- Medical Waste Treatment Facility Local Bodies (CBWTF), to cover Jhalawar and Baran Common Bio- Medical Waste Treatment Facility Local Bodies (CBWTF), to cover Kota and Bundi Common Bio- Medical Waste Treatment Facility Local Bodies (CBWTF), to cover Jaipur, Dausa, Nawa and Kuchaman 2521.62

0.70

DBOOT

December, 2008 28.08.2010 2005

2. 3.

0.70 0.70

DBOOT DBOOT

4.

5.

Common Bio-Medical Waste Treatment Facility Local Bodies (CBWTF) to cover Ajmer, Bhilwara, Parbatsar, Makrana and Merta City Common Bio-Medical Waste Treatment Facility Local Bodies (CBWTF) to cover Jodhpur and Pali Common Bio-Medical Waste Treatment Facility Local Bodies (CBWTF) to cover Hanumangarh and Shri Ganganagar Common Bio-Medical Waste Treatment Facility Local Bodies (CBWTF) to cover Bikaner, Nagaur and Ladnun Common Bio-Medical Waste Treatment Facility Local Bodies (CBWTF) to cover Sawai Madhopur, Tonk and Karauli

0.70

DBOOT

21.02.2005

0.70

DBOOT

21.02.2005

6.

0.70

DBOOT

21.02.2005

7.

0.70

DBOOT

21.02.2005

8.

0.70

DBOOT

21.02.2005

Plant is working through Sh. Ankur M/s Hoswin Incinator, Jhalawar Plant is working through Sh. Rajdeep Biotech, Kota Plant is working through Sh. Ranjeet Singh Rajputana, Biotech Ltd. Sawai Madhopur Plant is working through Sh. Anil Jain sales promoters, Ajmer. Plant is working through Sh. Basant Rathore sales promoters, Ajmer. Plant is working through Sh. Ghanshyam, E-Tech Project, Ganganagar Plant is working through Sh. Manish Rajpurohit, E-Tech Project, Bikaner Plant is working through Sh. Sumer Singh Rajputana, Biotech Ltd. Sawai
6

9.

Common Bio-Medical Waste Treatment (CBWTF) to cover Alwar and Bharatpur

Facility Local Bodies

0.70

DBOOT

21.02.2005

10.

Common Bio-Medical Waste Treatment Facility Local Bodies (CBWTF) to cover Jaipur City. Solid Waste Treatment Plant, Jaipur JMC, Jaipur JDA

0.70

DBOOT

21.02.2005

11.

20.00

DBOOT

April, 2007

12.

Construction of Foot Over Bridge at Collectorate Circle, Jaipur

2.50

BOT

August, 2006

Madhopur Plant is working through Sh. Arvind Sharma, M/s Hoswin Incinator, Alwar Plant is working through Sh. Himanshu, Instromedics Pvt. Ltd, Jaipur. Plant is working through Grashim India Ltd. at Langariwas Project completed by M/s Pioneer Publicity Corporation, Jaipur. Concession period is 34 years 4 months including the construction period w.e.f. 15.07.2005.

Sub Total (B) (C) 1. Water Sector Desalination Plant, Matasukh (Nagaur)

29.50

RSMM Ltd.

300.00

DBOOT

30.09.2010

Project completed by Nagaur Water Supply Company Pvt. Ltd. (promoted by Doshion Ltd.)

Sub Total (C) (D) 1. 2. 3. Social Sector Shree Devi Women Polytechnic College, Hanumangarh Veena Institute of Technical Education, Karauli Mantram Women Polytechnic College, Dungarpur Technical Education Technical Education Technical

300.00 5.49 5.49 5.49 BOT BOT BOT 09.03.2010 December, 2011 December, Classes running in its own building. Classes running in its own building. Classes running in its own
7

4.

Education Vikas Polytechnic College, Madera, Deeg Bhartpur Technical Road, Deeg (Bhartpur) Education Saraswati Polytechnic College, School Building, Village: Rajota, (Khetri) Dist. - Jhunjhunu Bright Career Polytechnic College, Bhamatsar, Nokha [Bikaner] Technical Education Technical Education

9.30

BOT

2011 March, 2011 March, 2011 March, 2011 March, 2011 March, 2011 March, 2011 March, 2011 March, 2011 March, 2011 March, 2011

building.

College running in its own building College running in own building. College running in its own building College running in rented building. College running in its own building College running in rented building. College running in its own building College running in its own building College running in its own building College running in its own
8

5.

9.30

BOT

6.

9.30

BOT

7.

Sugan Inst. Of Tech. & Engg.,Paramveer Near Electric Technical Board, Pokhran Phalodi Road, Phalodi [Jodhpur] Education Rajasthan Polytechnic College,Behind State Middle Technical School, R.S.E.B. Raod, Ratangarh Education Satyam Institute of Technology, Abhishek Technical Bhawan,Outside Nehru Gate, Beawar [Ajmer] Education Rajasthan Institute of Engineering & Technology , Bhankrota, Ajmer Road, Chittorgarh-302026 Technical Education

9.30

BOT

8.

9.30

BOT

9.

9.30

BOT

10.

16.40

BOT

11.

Dungarpur College of Engineering and Technology, Vill. Technical Education Bori Simalwada Road, Dungarpur Chartered Institute of Technology, Kh. No. 276/252 at Vill. Danvav, Abu Road Tagore Engineering College, Technical Education Technical

16.40

BOT

12.

16.40

BOT

13.

16.40

BOT

Near DIET Vill. Pnwari, Kunchamancity, Nagaur 14. Asians Institute of Technology Viil. Bhunja Via Kathun, Techsil Newai,Tonk 15. Shri Digambar Prashikshan Avum Anusandhan Sansthan, Gulzar Bagh, Bharatpur Vedant College of Engineering and Technology, Bundi

Education Technical Education Technical Education Technical Education Technical Education 16.40 BOT March, 2011 March, 2011 March, 2011 March, 2011

building College running in its own building College running in its own building College running in its own building College running in its own building

16.40

BOT

16.

16.40

BOT

17.

Regional Engineering College, Dhamotar, Pratapgarh

16.40

BOT

Sub Total (D) Grand Total (A+B+C)

203.47 3054.59

Rajasthan

Annexure II

Status of Public Private Partnership (PPPs) Projects in Infrastructure (As on December 31, 2011) Projects under Implementation
S. No. Project Name Department/ Agency Estimated Cost (Rs. in crores) Structure BOOT/ BOT Date of Award Likely date of Completion Remarks If any

1 (A) 1.

2 Road Sector Jaipur to Bhilwara (SH-12)

PWD

220.00

DBFOT

16.03.2010

Dec., 2012

2.

Chomu to Mahala via Renwal Jobner (SH -19 & 2C)

PWD,

134.20

DBFOT

22.02.2011

Jun, 2013

3.

Hanumangarh - Suratgarh

RSRDC

255.84

BOTAnnuity

07.09.2010

March, 2012

4.

Chittorgarh Kapasan - Mavli-

RSRDC

425.96

BOT -

14.10.2010

March, 2012

Agreement signed on 12.07.10 with M/s Jaipur-Bhilwara Tollway Pvt. Ltd. Jaipur (M/s SPML). Performance Security deposited by Entrepreneur Supplementary agreement signed on dated & work started on 02.02.2012 Fin. Bid Recd. with 13.41% VGE from M/s Unity. Agreement signed on 05.06.11 with Chomumahala toll Way Pvt. Ltd. Jaipur (SPV). Performance Security deposited by entrepreneur. Km 9/0 to 50/0 and byepass road furniture in progress protection work in progress in km 36/0 to 15/0 work of gaggar bridge is also in progress. Work of major bridge in km, 5/600
10

Dabok 5. Pali Nadol Narlai - Gomti Choraya (a) Merta-Ras (50) (b) Ras-Mangliawas (35) Fatehnagar Dariba mines Mahuwa Hindon - Karauli Jodhpur Osiya - Phalodi Salumber - Keer ki Chowki Gotan Pundulu BorundaRansigaon Sojat Banswara Ratlam (Upto M.P. Border) Mangalwar Nimbahera Bharatpur Deeg- Alwar Jahajpur Mandalgarh Alwar to Bhiwadi (4-Lane) Arjunsar to Pallu Jhalawar to Jhalawar Road RSRDC 193.95

Annuity BOT Annuity BOT Annuity BOT Annuity BOT Annuity BOT Annuity BOT Annuity BOT Annuity BOT Annuity BOTAnnuity BOTAnnuity BOTAnnuity BOT BOT BOT May, 2010 March, 2012

6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18.

RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RSRDC RIDCOR RIDCOR RIDCOR

294.83 25.00 168.03 208.74 163.50 167.45 117.03 86.73 135.69 197.37 330.11 83.93 79.73

02.09.2010 16.02.2010 19.01.2011 03.02.2011 03.02.2011 02.02.2011 23.05.11 5/11 5/11 -

March, 2012 March, 2012 April, 2012 April, 2012 March, 2012 March, 2012 June, 2012 July, 2012 July, 2012 November, 2012 -

in progress and road signage in km 50/0 to 60/0 in progress Tender for balance work in km 290/0 to 306/0 are in process of approval. Work in progress. Land acquisition in progress. Work in progress. Work in progress. Work in progress. Work in progress. Work in progress. Work in progress. Work in progress. Work in progress. Work in progress. Likely date of completion Nov. 2012 Work in progress. Indicated tolling period is 30 years. Tolling will commence uptill re-payment of loan thereafter GoR to take a decision on utilization of surplus in SRF or development of other
11

Roads. 19. Khushkhera to kasola Chowk RIDCOR 34.50 BOT Work in Progress. Land acquisition issue in 2.5 KM is under process. DPR completed. Part work being taken up. Forest clearance awaited from GOR, RFQ has been submitted by 5 Agencies CD works in progress in part length, existing concession period of BOT will end on 17.01.2012 Concession agreement executed on 17.01.2012 with M/s. Chetak Enterprises. LOA issued to M/s. D.K. Infra. Pvt. Ltd. Mumbai. Agreement signed on 04.11.2011 with M/s D.K. Infra Pvt. Ltd. Mumbai. Commencement date 16.11.2011. Agreement signed on 09.12.2011 with M/s SPC Chetak Toll Roads Pvt. Ltd. Jaipur Agreement signed on 09.12.2011 with M/s. Chetak Jainco Toll way Pvt. Ltd. Jaipur. Commencement date 05.02.2012 . LOA issued to M/s HG infra Pvt. Ltd. Jaipur. Agreement signed on 03.01.2012
12

20.

Kapren to Mangrol

RIDCOR

121.69

BOT

21.

Jhalwar Border)

to

Ujjain

(upto

Raj.

RIDCOR

75.88

BOT

22.

Rohat-Jalor

PWD

56.38

BOT

12.12.2011

23. 24.

Jalore Ramsingh Revdar Sanchore Makhupura State Border

PWD PWD

51.75 11.61

BOT BOT

09.12.2011 -

25.

Chirawa Singhana Pacheri up to Haryana Border Kota Jharal-Ke-Balaji via Tather Sultanpur-Ganesh Ganj Itawa.

PWD

35.87

BOT

26.

PWD

64.56

BOT

27. 28.

Bali Sewaro Pinwara Laxmangarh Salasar

PWD PWD

25.21 13.96

BOT BOT

25.10.2011 -

29.

Sriganganar Padampur Raisinghnagar Anupgarh

PWD

17.57

BOT

30.

Salumbar Banswara

PWD

46.33

BOT

31.

Ring Road around Jaipur City

Jaipur Development Authority Jaipur Development Authority

890.00

DBFOT

16.05.2011

April, 2013

32.

Alternate route to Ghat Ki Guni by construction of tunnel through Jhalana hills to connect NH-11, Agra Road

150.00

DBFOT

13.10.2009

30.06.2012

with M/s Deepak & Co., Sri Ganganagar. Commencement date 05.01.2012 Agreement signed on 30.11.2011 with M/s Deepak & Co., Sri Ganganagar. Commencement date 22.12.2011 Agreement signed on 22.12.2011 with M/s GHV India Pvt. Ltd. Mumbai. Commencement date 22.12.2011 Land acquisition is in progress. Around 30 km length has been taken under possession out of 47 km. The work is in progress. In about 860 mtr length, Tunnel Tube (each tube) has been excavated; excavation of tunnel inter connector at two places have been completed. Flyover work on Agra Road near Chulgiri along with RE wall work is in progress. CD works at one location is completed and at two locations are in progress. Other works like construction of drain, RCC retaining wall, earth work & rock excavation for roads is in progress.

Sub - Total (A)

4883.40
13

(B) 1.

2.

3.

4.

5. 6.

Urban Infrastructure Common Bio- Medical Waste Treatment Facility (CBWTF), to cover Sikar, Jhunjhunu, Didwana, Mundwa and Kuchara Common Bio- Medical Waste Treatment Facility (CBWTF), to cover Udaipur City Common Bio- Medical Waste Treatment Facility (CBWTF), Jalore Rope Way from Manikya Lal Verma Park to Karni Mata Temple, Udaipur Special Economic Zone (SEZ), Jaipur Jal Mahal Tourism Project, Jaipur

DLB

0.70

DBOOT

21.02.2005

Civil work Establishment of process. Agreement due.

completed. Plant is in

DLB

0.70

DBOOT

2005

DLB

0.70

DBOOT

16.09.2008

Agreement due.

UIT, Udaipur RICCO Tourism (RTDC) Tourism (RTDC)

3.00

BOT

Work in progress.

1500.00 200.00

JV BOOT

22 Nov., 2005 22 July, 2009

Work in progress. Phase-I near completion and phase-II will take 3 years after completion of Phase-I. Work in progress.

7.

Restoration and Conservation of Tijara Fort, Alwar

25.00

BOOT

Sub Total (B) (C) 1. Social Sector Affordable housing with focus on EWS & LIG housing, Mukandpura near Bhankrota, Jaipur through M/s Vinkash Estess Pvt. Ltd.

1730.10

UDH

17.90

Model No. 2 (Private Developers on land owned by them)

09.02.2011

08.02.2014

Under Affordable Housing Policy 2009. Total 512 Flats Comprising of 288 EWS, 144 LIG and 80 MIG.

14

2.

Affordable housing with focus on EWS & LIG housing, Village Ramla ka vaas Teshil, Kalwar, Jaipur through M/s Bhairav Township Pvt. Ltd.

UDH

19.36

Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private Developers on land owned by them) Model No. 2

23.02.2011

22.02.2014

Under Affordable Housing Policy 2009. Total 576 Flats Comprising of 320 EWS, 192 LIG and 64 MIG.

3.

Affordable housing with focus on EWS & LIG housing, village Mahapura near Sez, Jaipur through M/s Majestic Realmart Pvt. Ltd.

UDH

31.95

23.02.2011

22.02.2014

Under Affordable Housing Policy 2009. Total 960 Flats Comprising of 608 EWS, 224 LIG and 128 MIG.

4.

Affordable housing with focus on EWS & LIG housing, near Pink pearl, Ajmer Road, Jaipur through M/s Sintex Industries Ltd.

UDH

14.30

07.01.2011

06.01.2013

Under Affordable Housing Policy 2009. Total 432 Flats Comprising of 256 EWS, 128 LIG and 48 MIG.

5.

Affordable housing with focus on EWS & LIG housing, Village Bagru Khurd, Thikerya, Ajmer Highway, Jaipur through M/s Siddha Infra project Pvt. Ltd.

UDH

13.54

23.02.2011

22.02.2013

Under Affordable Housing Policy 2009. Total 400 Flats Comprising of 224 EWS, 128 LIG and 48 MIG.

6.

Affordable housing with focus on EWS & LIG housing, Village Bagru

UDH

25.38

04.02.2011

03.02.2013

Under Affordable Housing Policy 2009. Total 704 Flats Comprising


15

Khurd Omex city, Ajmer Road, Jaipur through M/s Shiv Shakti Real Homs Pvt. Ltd.

(Private Developers on land owned by them) UDH 39.17 Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private 14.06.2011 13.06.2014

of 384 EWS, 192 LIG and 128 MIG.

7.

Affordable housing with focus on EWS & LIG housing, Village Shyampur Buhariya Vatika Road, Sanganer, Jaipur through M/s Regency Buildhome Pvt. Ltd.

Under Affordable Housing Policy 2009. Total 1120 Flats Comprising of 672 EWS, 256 LIG and 192 MIG.

8.

Affordable housing with focus on EWS & LIG housing, Village Nevta, Teshil Sanganer, Jaipur through M/s Siddhi Vinayak Affordable Homes Ltd.

UDH

36.37

11.03.2011

10.03.2014

Under Affordable Housing Policy 2009. Total 1072 Flats Comprising of 592 EWS, 352 LIG and 128 MIG.

9.

Affordable housing with focus on EWS & LIG housing, Chakshu, Jaipur through M/s Patni Builders Pvt. Ltd.

UDH

59.76

07.01.2011

06.01.2014

Under Affordable Housing Policy 2009. Total 1880 Flats Comprising of 1104 EWS, 648 LIG and 128 MIG.

10.

Affordable housing with focus on EWS & LIG housing, Village Biranvaas Tehsil Kotkasim,

UDH

13.75

02.02.2011

01.02.2013

Under Affordable Housing Policy 2009. Total 400 Flats Comprising of 208 EWS, 144 LIG and 48 MIG.
16

Bhiwadi Distt. Alwar through Falcon Reality services Pvt. Ltd.

Developers on land owned by them) UDH 13.57 Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private Developers on land owned by them) Model No. 2 (Private Developers 22.01.2011 21.01.2013 Under Affordable Housing Policy 2009. Total 400 Flats Comprising of 224 EWS, 128 LIG and 48 MIG.

11.

Affordable housing with focus on EWS & LIG housing, Village Biranvaas Tehsil Kotkasim, Bhiwadi Distt. Alwar through Sun System Institute of Information

12.

Affordable housing with focus on EWS & LIG housing, panwadi sargod, Trisingiya, Kuchaman city Nagaur through Shree Ram Balaji Developers & Infrastructures Pvt. Ltd. Affordable housing with focus on EWS & LIG housing, AjmerBeawar Road NH-8, In front of Tabiji Railway Station, Ajmer through Golden Line Infrastructure Pvt. Ltd. Affordable housing with focus on EWS & LIG housing, Village Jirota Khurd, near shyam sarowar, Distt. Dausa on Main NH-11 through

UDH

28.22

16.06.2011

15.06.2013

Under Affordable Housing Policy 2009. Total 848 Flats Comprising of 496 EWS, 256 LIG and 96 MIG.

13.

UDH

20.24

01.09.2011

31.08.2014

Under Affordable Housing Policy 2009. Total 544 Flats Comprising of 240 EWS, 192 LIG and 112 MIG.

14.

UDH

14.66

19.05.2011

18.05.2013

Under Affordable Housing Policy 2009. Total 416 Flats Comprising of 224 EWS, 128 LIG and 64 MIG.
17

Amit Colonizers Ltd.

on land owned by them)


Technical Education

15

Baba Saheb Ambedker Technical Education Society, B-75, Raksha Vikash Appartment, Vikashpuri, New Delhi-110018 (for Dholpur) Kailker Awareness & Relief Welfare Society, A-13, Mohan Garden Ext. Uttam Nagar, New Delhi-110059 (for Barmer) Veena Memorial Seva Society, Gulab Baag, Karauli (for Karauli) Nav Uday Welfare & Charitable Society, 29-A, Pocket-1, Sector-7, Dwarla, Delhi (for Baran) Gyan Jyoti Shikshan Sansthan, 74, Sharma Colony Ward no. 24, Churu, Raj. (for Churu) Rajasthan Institute of Engineering & Technology, Jaisalmer Sawai Madhopur College Engineering & Technology, Sawai Madhopur

16.40

BOT

2011-12

31.03.2013

New Society Selected. Land allotted to society. Letter of Approval from AICTE not received.

16

Technical Education

16.40

BOT

2011-12

31.03.2013

New Society Selected. allotment under process

Land

17

Technical Education Technical Education

16.40

BOT

2011-12

31.03.2013

New Society Selected. allotment under process New Society Selected. allotment under process New Society Selected. allotment under process

Land

18

16.40

BOT

2011-12

31.03.2013

Land

19

Technical Education

16.40

BOT

2011-12

31.03.2013

Land

20

Technical Education Technical Education

16.40

BOT

2011-12

31.03.2013

Land allotted to society. Letter of Approval from AICTE not received. Land allotted to society. Letter of Approval from AICTE not received.

21

16.40

BOT

2011-12

31.03.2013

18

22

Swami Vivekanand College of Engineering and Technology, Jalore Swasthya Kalyan Women Polytechnic College Tonk Shri Jawahar Women Polytechnic College, Dausa Vivakanand Institute Technology, Bhilwara. of

Technical Education

16.40

BOT

2011-12

31.03.2013

Land allotted to society. Letter of Approval from AICTE not received. College is running in own building and building construction is under progress. College is running in own building and building construction is under progress. College is running in own building and building construction is under progress. College is running in own building and building construction is under progress. College is running in own building and building construction is under progress. College is running in own building and building construction is under progress. College building construction is now not in progress. Admission nil since last 2 sessions. A consortion of Ziqitza Health Care Ltd. and International Centre for Emergency Techniques, Bombay are operating 108Ambulance service since July, 2010 in the State. Presently A fleet of 411 Ambulances including 14
19

23.

Technical Education Technical Education Technical Education Technical Education Technical Education Technical Education Technical Education M&H Deptt.

5.49

BOT

2007-08

31.03.2013

24

5.49

BOT

2007-08

31.03.2013

25

5.49

BOT

2007-08

31.03.2013

26

27

Bhadariya Mateshwari Polytechnic College for Women, Jalore Rajasthan Institute of Engineering and Craft, Dholpur Rajasthan Girls College, Baran Chandrawati Girls College, Jaisalmer Polytechnic

5.49

BOT

2007-08

31.03.2013

5.49

BOT

2007-08

31.03.2013

28

5.49

BOT

2007-08

31.03.2013

29

Polytechnic

5.49

BOT

2007-08

31.03.2013

30

Emergency Response Service Knowingly as 108 Ambulance Project

55.68

O&M

01.07.2010

Agreement signed with consortium ZHL Ltd. on 07.04.2010 for 3 years period

which is extendable for next 2 year.

31

Rajiv Gandhi Mobile Medical Services in Rajasthan

Medical & Health

25.92

O&M

October, 2011

32

Toll Free 104 Medical Advice Service

M&H Deptt.

1.15

O&M

06.09.2011

33

Manas Arogya Heart - Care Hospital & Research Institute in

Medical Education

56.00

O&M

June 09, 2011

November, 2012

provided by Disaster Management are in operation. As per the agreement, operation cost per Ambulance is Rs. 94,899/- and Medicine cost approx. Rs. 5,000/ Ambulance/Month. As per agreement, the ZHC Ltd. has to do 5 Trips/ Day /Ambulance, otherwise amount is deducted proportionately. Presently State has 52 Medical Mobile Units and 150 Medical Mobile Vans. These are being operated through NGOs/Service Provider. Operation cost of Rs. 31.00 lacs is per year and Capex of Rs. 37.88 lacs per year which include procurement cost of Medical Mobile Units and Vans. Contract Agreement signed with Health Management and Research Institute (HMRI), Hyderabad initially for 3+2 years on 21.09.2011. The service is operational through a centralized 24X7 call centre which is established at State HQ. The service is started from 21.11.2011 however; formally launched on 16.01.2011. Preferred bidder has been identified and concession
20

Jaipur

agreement executed for 30 years. DPR of the concessionaire approved. Works are in progress. Sub Total (C) 656.55

(D) 1.

Power Sector Lignite based Power Plant, Bhadresh (Barmer)

RSMM Ltd.

5000.00

BOOM

29.05.2006

April, 2012

2.

400 kV S/C Bikaner- Deedwana Ajmer Line with 400 kV/220 kV GSS at Deedwana

RRVPN Ltd.

285.00

BOOM

TSA with DISCOM on 15.02.2011

2012-13

3.

400 kV S/C Hindaun-Alwar Line with 400/220 kV GSS at Alwar

RRVPN Ltd.

188.32

BOOM

TSA with DISCOM signed on 19.01.2011

2012-13

Total 8 units are to be setup. 4 units have started generating power while remaining 4 units are likely to generate power by April, 2012. The firm has started work on the line i.e. taking Transmission licence from the regulator and preliminary survey etc. It also filed petitions for (i) Adoption of Transmission charges and (ii) Grant of Transmission License. RERC ordered the petitions adversely. The firm and RVPN have filed appeal with appellate tribunal APTEL. The firm has started work on the line i.e. taking Transmission licence from the regulator and preliminary survey etc. It also filed petitions for (i) Adoption of Transmission charges and (ii) Grant of Transmission License. RERC ordered the petitions adversely. The firm and RVPN
21

4.

220 kV S/C Sikar Nawalgarh Jhunjhunu Line with 220/132 kV GSS at Nawalgarh

RRVPN Ltd.

36.28

BOOM

LoI issued on 23.02.2011

2012-13

have filed appeal with appellate tribunal APTEL. SPA and Transmission Service Agreement (TSA) are to be signed after signing of Sub-lease agreement between SPV and RVPN which is under process.

Sub Total (D) (E) 1. IT Sector Rajasthan State Wide Area Network (RajSWAN) Project -

5509.60

IT, Deptt.

120.21

BOOT

15 April, 2011

2015

2.

Common Project.

Service

Centres

RajComp

106.40

BOO

2014

Work order has been issued to Bharti Airtel in the month of April, 2011. The project will be rolled out in the next financial year. Work in progress. Total 6,626 kiosks will be set up across the State under the project out of which 2612 kiosks have been made operational.

(F) 1.

Sub Total (E) Any Other Sector Multi Chamber Cold Storage (4000 M. T.) at Mandi Yard, Alwar RSAMB

226.61

3.85

O & M on lease basis

22.03.2010

31.03.2012

Construction work is likely to be completed by March 31, 2012 and operation will be done for a 5 year period after completion of civil works by the selected Private Agency - Shri Shubham Logistics Ltd. Santacruz (E), Mumbai.
22

2.

Multi Chamber Cold Storage (2000 M. T.) at Mandi Yard, Sikar

RSAMB

2.38

O & M on lease basis

22.03.2010

31.01.2012

Construction work is likely to be completed by March 31, 2012 and operation will be done for a 5 year period after completion of civil works by the selected Private Agency Blue Star Ltd., Gurgaon, Haryana Construction work is likely to be completed by March 31, 2012 and operation will be done for a 5 year period after completion of civil works by the selected Private Agency Blue Star Ltd., Gurgaon, Haryana Construction work is likely to be completed by March 31, 2012 and operation will be done for a 5 year period after completion of civil works by the selected Private Agency Blue Star Ltd., Gurgaon, Haryana Construction work is likely to be completed by March 31, 2012 and operation will be done for a 5 year period after completion of civil works by the selected Private
23

3.

Multi Chamber Cold Storage (2000 M. T.) at Mandi Yard, Udaipur

RSAMB

2.54

O & M on lease basis

22.03.2010

31.03.2012

4.

Multi Chamber Cold Storage (1000 M. T.) at Mandi Yard, Sumerpur, District Pali

RSAMB

1.28

O & M on lease basis

15.04.2010

30.04.2012

5.

Multi Chamber Cold Storage (6000 M. T.) at Mandore Mandi, Jodhpur

RSAMB

4.90

O & M on lease basis

15.04.2010

31.01.2012

Agency - Shri Shubham Logistics Ltd. Santacruz (E), Mumbai. 6. Multi Chamber Cold Storage (2000 M. T.) at Mandi Yard, Bhilwara RSAMB 2.28 O & M on lease basis 22.03.2010 31.03.2012 Construction work is likely to be completed by March 31, 2012 and operation will be done for a 5 year period after completion of civil works by the selected Private Agency Blue Star Ltd., Gurgaon, Haryana

Sub Total (F) Grand Total

17.23 13023.49

24

Rajasthan

Annexure - III

Status of Public Private Partnership (PPPs) Projects in Infrastructure (As on December 31, 2011) Projects under Planning / Pipeline
S. No 1 (A) 1. Project Name Department /Agency 3 Estimated Cost (Rs. In crores) 4 Structure BOOT/BOT 5 Likely Date of Award 6 Remarks If Any 7

2 Road Sector Bikaner Suratgarh ( NH-15 )

PWD

501.08

DBFOT

January, 2012

2.

Chittorgarh Neemuch ( MP Boarder) ( 38 KM) and Nimbahera Pratapgarh ( 80 KM ) ( NH- 79 & 113)

PWD

511.21

DBFOT

RFQ process completed. (33/41) Approved in the DEA/EI meeting held on 20 July, 2011 at Delhi & PPPAC meeting on 10.08.2011. Approved in CCI dt. 16.11.2011 vide MoRTH letter dt. 02.12.2011. RFP issued BDD 12.12.2011 (mod.) 06 Nos RFP BID received on BDD. Bids submitted to MoRTH for approval on 19.12.2011. Bid of Highest Premium Bidder (Rs. 251 Cr.) M/s MBL-SREI Consortium approved by MoRTH on 02.01.2012 for LOA, which is issued on 09.01.12. RFQ process completed. (36/42) Approved in the DEA/ EI meeting held on 20 July, 2011 at Delhi & PPPAC meeting held on 10.08.2011. Approved in CCI dated 16.11.2011 vide MoRTH letter dated 02.12.2011. RFP issued. BDD 07.12.2011 (Mod.) 09 Nos RFP BID received on BDD. Bids submitted to
25

3.

Suratgarh Sriganganagar (NH-15)

PWD

224.03

DBFOT

4.

Ajmer Nagaur ( NH- 89)

PWD

377.15

DBFOT

5.

Sikar Bikaner (NH-11)

PWD

650.84

DBFOT

6.

Nagaur Bikaner (NH- 89)

PWD

378.07

DBFOT

MoRTH for approval on 19.12.2011 with highest bidder premium of Rs. 22.61 Cr. By M/s Chetak Enterprise. Approval awaited. RFQ process completed. (39/44) Approved in the DEA/EI meeting held on 20 July, 2011 at Delhi and PPPAC meeting held on 10.08.2011. Competent approval awaited. RFP issued. BDD is 18.01.2012 (Mod.) One No. Bid of M/s Unity Infra projects Ltd. Quoting grant of Rs. 5.70 Cr. recd. RFQ process completed. (38/44) Approved in the DEA/EI meeting held on 20 July, 2011 at Delhi and PPPAC meeting held on 10.08.2011. Competent approval awaited. RFP issued. BDD is 18.01.2012 (Mod.) 4 No. Bids recd. with lowest grant of Rs. 45.00 Cr. quoted by M/s GVR infraprojects ltd. Chennai. RFQ process completed. (42/49) Approval of SFC/PPPAC/DEA from MoRTH is awaited. Appraisal reply of DEA & Planning Commission submitted to MoRTH on 16.09.2011. RFP issued on 04.01.2012. Approved in PPPAC on 13.12.2011. BDD is 12.03.2012. RFQ process completed. (37/44) Modified PPACC & DEA proposal submitted on 05.07.2011 & 18.08.2011 EI meeting held on 06.01.2012 New Delhi. Approval awaited. BDD is
26

7.

Nagaur Jodhpur( NH- 65)

PWD

411.18

DBFOT

8.

Jodhpur Pali ( NH-65)

PWD

342.72

DBFOT

9. 10.

11. 12.

13.

14.

Bharatpur Alwar Beheror Narnaul Road (SH-14) Kotputali to Kuchaman and Daulatpura via Neem-KaThana (SH-37B &7) Jaipur to Nagaur via Jobner ( SH-2 & 7) Mathura (Raj. Border) to Bharatpur to Hinduan via Bayana (SH-1A) Rawatsar Nohar Bhadra upto Haryana Border (Km. 30/400 to Km. 148/00) (GREFRoad) Dausa Chaksu Dudu (SH-2)

RSRDC RSRDC

131.92 357.75

BOT-Annuity BOT- Annuity

12.03.2012. RFQ process completed. (38/45) Modified SFC/PPPAC/DEA proposals submitted to MoRTH on 16.09.2011. EI meeting held on 06.01.2012 at New Delhi. Approval awaited. RE-RFQ (38 Nos) received on 09.11.2011 Approval/Evaluation under process. Modified SFC/PPPAC/DEA proposals submitted on 27.09.2011, 16.11.2011. Approval awaited. Tender Due on 12.03.2012 Tender Due on 12.03.2012

RSRDC RIDCOR

342.00 350.00

BOT- Annuity BOT- Annuity

Tender Due on 12.03.2012 No Financial bid received by RSRDCC on due date. Project is awarded to RIDCOR. Delisted from PPP awarded to RIDCOR. model. Project

RIDCOR

291.56

BOT- Annuity

PWD

165.00

BOT- Annuity

15.

Dudu Sambhar ( SH-2)

PWD

40.00

BOT- Annuity

No Financial bid received on due date 29.09.2010. Proposed to transfer the road to RSRDCC for development on BOT (Annuity) and Toll basis. No Financial bid received on due date 08.12.2010. Proposed to transfer the road to RSRDCC for development on BOT
27

16. 17. 18. 19. 20. 21. 22. 23. 24.

Rishabhdeo Salumber Dungarpur Banswara Dhabadeh Ramaganj mandi Jhunjhunu Udaipurwati Khandela Khandela Srimadhopur Reengus Khatushyamji Metra Gotan Piparcity Jodhpur Fatehpur Jhunjhunu Malsisar Rajgarh Road Aspur Doongarpur

RSRDC RSRDC RSRDC PWD PWD PWD PWD PWD PWD

90.00 165.00 69.63 86.22 43.26 74.47 25.44 64.10 93.84

BOT - Annuity BOT - Annuity BOT - Annuity BOT BOT BOT BOT BOT-VGF BOT-VGF

20.03.2012. 20.02.2012. 20.02.2012.

(Annuity) and Toll basis. DPR under preparation. DPR under preparation. To be taken up after comp. Of ROB. Bid received, tenders under approval. Bid received, tenders under approval. Bid received, tenders under approval.

25. 26.

27.

Sardulshahar (Punjab state Border) Hanumangarh- TibbiAlinabad (Hariyana Border) Sirsa (Hariyana) LudesarBhadra-Sidhmukh-Rajgarh Lunkaransar (NH-15) KaluShreedoongargarh (NH-11) Sardarsahahar (NH-64) Sardarsahahar (NH-64) Tarangar Rajarh (NH-64) Sub Total (A)

PWD PWD

45.16 96.85

BOT-VGF BOT-VGF

20.02.2012. 20.02.2012.

PWD

70.78

BOT-VGF

20.02.2012.

5999.26

(B) 1.

Urban Infrastructure Exhibition cum Convention

RIICO

216.65

BOT

February,

The preferred bidder has been identified


28

Centre at Sitapura Industrial Area , Jaipur

2012

2.

International Convention Center, Pratap Nagar, Jaipur

RHB

1026.00

DBFOT

3.

4. 5.

Jalore Area Development Program Drinking Water Supply & Sanitation Project Convention Centre, Kota Jaipur Metro Rail Project

PHED

962.00

consequent upon the Request for Proposal for the project. LoA has been issued on 13 Feb., 2012 to preferred bidder. EoI was released in Oct., 2010 and technical bids have also been received; only one offer received. Final decision is to be taken on the project. Implementation structure is under approval. Under bidding. Sanctioned under IIPDF scheme of Government of India for project development. Stage-II of this project for development of Corridor (Ambabari Sitapura and Chandpole Badi Chaupar), acquisition of all rolling stock and operation and maintenance of the entire metro rail system are proposed on PPP mode. Applications have been invited through RfQ. 5 applications were received, out of which 4 applications have been qualified. After successful biding out of the Tijara Fort, Government decided to lease out 16 selected properties on the same lines. Initial study found 3 forts as most feasible ones out of total 16 and Government is planning to bid out two forts. Estimated cost will be in the range
29

UIT, Kota Jaipur Metro Rail Corporation (JMRC)

81.46 9732.00

BOT -

6.

Restoration and Conservation of Forts in the State and Conversion of same into Heritage Hotels

Tourism/ RTDC

0.00

BOT (60 Year Lease Basis)

of 20 Cr. to 30 Cr. for properties selected under Phase-I. 7. Solid Waste Treatment Plant at Sewapura Nagar Nigam, Jaipur 20.00 DBOOT 2010-11 Work is yet to be started.

8.

Solid Waste Treatment Plant Municipal at Sikar Council, Sikar Integrated Solid Waste Management Project Jaipur Integrated Solid Waste Management Project, Jodhpur Integrated Solid Waste Management Project, Ajmer, Kishangarh and Pushkar Integrated Solid Waste Management Project, Kota, Bikaner and Udaipur Amusement Park with Snow Theme at Jawahar Circle, Jaipur Nagar Nigam, Jaipur Nagar Nigam, Jodhpur DLB

13.00

DBOOT

LoA issued to M/s Ruchem Ltd. Mumbai. Land has been allotted. RfP is being issued.

9.

60.00

DBOOT

10.

40.00

DBOOT

RfP is being issued.

11.

0.00

DBOOT

12.

DLB

0.00

DBOOT

13.

JDA

33.50

DBFOT

Proposal dropped as the financial module of the concessionaire M/s Pink Paradise Fun & Food park, Faridabad was not appropriate and viable.

Sub - Total (B) (C) 1. Water Sector Bisalpur-Tonk Uniyara Drinking Water Supply Project

12184.61

PHED

400.00

BOT with Annuity based

Consequent upon RfQ, 14 firms have been short listed. RfP and Draft
30

2. 3. 4.

for 2 towns (Tonk & Uniyara) and 436 villages in Deoli, Uniyara and Tonk Tehsils of Tonk District Water Supply & Sewerage System for Udaipur town Water Supply & Sewerage System for Ajmer and Pushkar Rehabilitation & O&M of Raw Water Pumping Stations for Jaisamand Sub Total (C)

payments

Concession finalized.

Agreement

are

being

PHED PHED PHED

1000.00 700.00 9.00

DBFOT DBFOT BOT

Technical appointed. Technical appointed. -

consultant consultant

has has

been been

2109.00

(D) 1.

2.

3. 4.

Power Sector 400 kV D/C Babai - Jaipur (North) (Twin Moose) line along with 400/220 kV GSS at Jaipur (North) 400 kV D/C Jodhpur (New)Udaipur (Twin Moose) Line along with 400/220 kV GSS at Udaipur 400 kV Bikaner Sikar D/C line (Twin Moose) 210 Km 400 kV AKAL Jodhpur (New) D/C line (Quad Moose) -240 Km Sub Total (D)

RRVPN Ltd.

221.80

BOOM

2013-14

RRVPN Ltd.

379.53

BOOM

2013-14

Notice inviting Bid published on 31.3.2011 and Pre- Bid conference held on 16.5.2011. Short listing of bids is under process. Notice inviting bid published on 21.09.2011 and Pre-bid conference held. Short listing of bids is under process. Being structured as per the guidelines based on VGF. Being structured as per the guidelines based on VGF

RRVPN Ltd. RRVPN Ltd.

219.58 512.27

BOOM BOOM

2013-14 2013-14

1333.18

(E)

Social Sector
31

1.

Gyanodaya PPP Schools (Establishment of 50 New Senior Secondary Schools in 10 districts of Ajmer and Udaipur Division on 30 year Concession period)

School Education

172.00

BOT

May, 2012

2.

3.

Sun & Sand Industries Ltd., Plot. No. I & III, Block XVI, Ogun Housing State Industrial Corporation, Sangootta, Ogun State Nigeria Samsung Overseas Ltd. 104, Adishwar Appt., Ferozshah Road, New Delhi 110 016 Shri Taijal Shikshan Sansthan At SMPR Road, Bhairuji Mode, Reengus, Sikar 332404 Vijay Shikshan Sewa Sansthan, C/o Vijay Hospital, Behind Police Station Bandikui, Dausa 303313 Society Affiliated to Rural Development for Health & Agriculture, Sardha Society, C/o Post Box No. 20, Deoli, Dist.-Tonk 304804

Technical Education

13.00

BOT

Sanctioned under IIPDF scheme of Government of India for project development. Consequent upon the RfQ for 50 schools, eligible applicants have been short listed. Application for VGF has been submitted to Govt of India in August, 2011. GoI is yet to sanctions VGF. Thereafter, RFP documents inviting financial bids will be issued to shortlisted eligible applicants. Proposed College at Ajmer

Technical Education

13.00

BOT

Proposed College at Bhiwadi, Alwar

4.

Technical Education Technical Education

13.00

BOT

Proposed College at Reengus, Sikar

5.

13.00

BOT

Proposed College at Rural Area Baswa, Dausa

6.

Technical Education

13.00

BOT

Proposed College at Rural Area, Devli, Tonk

32

7.

Shyam Knowledge Park Shiksha Samiti, E-562, Lal Kothi Scheme, Jaipur

Technical Education

13.00

BOT

Proposed College at Teh.-Bassi, Agra Road, Distt.Jaipur

8.

9.

10.

11.

12.

13.

14.

15.

16.

PNB Shikshan Santhan Ward No. 12, Mukandpura, Bhankrota,Jaipur Dhayawan Vikas Sanstha, Luriyawas, Teh. Sanganer, Jaipur Gurukul Shikshan Sansthan, V/P Rundal, Teh.-Amer, Jaipur Bhagwati Shiksha Samiti, 47, Satya Vihar Colony, Lal Kothi, Jaipur 302005 St. Conard Shiksha Samiti, St. Conard's Sr. Sec. School, Jagdish Talkies Tiraha, Dholpur 328001 Adarsh Indian Public School Shiksha Samiti, Near CISF Campus, Deoli, Tonk Praband Samiti, Bhartiya Vidya Mandir, 319, Dadu Marg, Barkat Nagar, Jaipur 302015 Stone Age Ltd. 117, Jaipur Tower, M.I. Road, Jaipur Vijayaraje Sindhiya Shikshan

Technical Education Technical Education Technical Education Technical Education

13.00

BOT

Proposed College at Vill.Jalsu, Tel. Amer, Distt. Jaipur Proposed College at Rural Area, Shahpura, Bhilwara Proposed College at Vill.Khor Bassi, Teh. Beharor,Distt.Alwar Proposed College at Bharatpur

13.00

BOT

13.00

BOT

13.00

BOT

Technical Education

13.00

BOT

Proposed College at Rural Area Dholpur

Technical Education Technical Education Technical Education Technical

13.00

BOT

Proposed College at Bundi

13.00

BOT

Proposed College at Jaipur Road, Kota

13.00

BOT

Proposed College at Rural, Deoli, Tonk

13.00

BOT

Proposed College at Rural


33

17.

18.

Sansthan, Awali Kalan, Gyan Mandir, Magan Bhai Market, Bhawanimandi, Jhalawar326502 Sharda Manohar Zila Jhalawar Mahila Vikas Samiti,New Master Colony,Jhalawar326001 Dee Jay Neelum Marble Industries Pvt. Ltd., NH-8, Bhuwana, Udaipur Shri Vinayak Mission Medical Education Society, P.No. 1, Mahaveer Nagar 'A', Muhana Road, Mansarovar, Jaipur 302020 Apex Education Committee, VPO Bassni, Teh. Mundawar, Alwar 301401 Surendra Public School Samiti, 25, Goverdhan Colony, New Sanaganer Road, Jaipur 302019 Computed Tomography (CT) Scan facilities in 14 Districts of Rajasthan

Education

Bhawanimandi, Jhalawar

Technical Education

13.00

BOT

Proposed College at Rural Jhalawar

Technical Education Technical Education

13.00

BOT

Proposed College at Udaipur

19.

13.00

BOT

Proposed College at Kishangarh, Ajmer

20.

Technical Education Technical Education

13.00

BOT

Proposed College at Teh.Khairthal, Alwar

21.

13.00

BOT

Proposed College at Kishangarh, Ajmer

22.

Medical & Health

30.00

23.

Setting up of a University for Youth Affairs

0.00

Initial tender process done in Nov/Dec, 2010. This had been failed as there were no tenders. Transaction consultant is being appointed for preparation of project documents. IIPDF assistance has been approved by
34

Physical Education and Sports, Jhunjunjhu

and Sports

DEA. 75% of the project development cost shall be met by GoI and remaining 25% is being borne by ADB. Ernst & Young have been retained as transaction advisor and have commenced work. EOI for the project is expected to be released in March, 2012. 462.00

(F) 1.

Sub Total (E) Any Other Sector Project at Khamnaur (Rajsamand) under Provision of Urban Amenities in Rural Area (PURA) Scheme Project at Sanganer (Jaipur) under Provision of Urban Amenities in Rural Area (PURA) Scheme Rural Dev.

132.03

BOT

DPR submitted to GoI for approval.

2.

Rural Dev.

120.17

BOT

DPR submitted to GoI for approval.

Sub - Total (F) Grand Total

252.20 22340.25