You are on page 1of 131

1

Group 4 Section 2
Project Feasibility Study and Evaluation 2012

Company Title: Modern Empire village

ID

Name

E-mail

Telephone
number

5131205071

Miss Saowapa srikrairot

error_yinz@msn.com

0897953495

5131205086

Miss Kanokwan bunkhet

tal_rpg@hotmail.com

0878495810

5131205128

Miss Thanisa kiddee

thanisa.kd@hotmail.com

0869188319

5131207092

Mr. Poom kosolsirisukkul

poomlovecud@hotmail.com

0826906286

5231205053
5231205181
5231207115
5331205089

Miss Nicharin kheunsakul


Mr. Olanrat upalavong
Mr. Sittikorn sroimori
Miss Sawaros kimsee

cherry_rasta@hotmail.co.th
krowpud@hotmail.com
symphonnydays@hotmail.com
Pong_pang@hotmail.com

0873036527
0884984479
0802495693
0855229909

Preface
This project is a part of 1203302 Project Feasibility Study and Evaluation Course in the
second semester of 2012. In this project is studying the feasibility of Real Estate business in
Chiang Rai, Chiang Khong, which include in natural and situation of real estate business, the
technical process to doing in this business, the nature of market in Chiang Rai, competitive
analysis, management in real estate, the financial feasibility of real estate business and risk of
real estate business.
This project makes for everyone who are interested to get more knowledge and
information about real estate business before making decision to investment in this business,
including prepare process and operation of real estate business, to get the profit to investment in
this business.
We expected that our project will provide more benefit for who interested person,
moreover, if we have some mistake in this project or whatever, our ground made an apology at
this opportunity

Modern Empire Village


Miss Saowapa srikrairot
Miss Kanokwan bunkhet
Miss Thanisa kiddee
Mr. Poom kosolsirisukkul
Miss Nicharin kheunsakul
Mr. Olanrat upalavong
Mr. Sittikorn sroimori
Miss Sawaros kimsee

Exclusive Summary
Modern Empire Village is a real estate business that concern about the real estate for
support AEC in next 3years. Chiang khong District that have area connect with Mea khong river,
and Laos, and in that area have Thai-Laos Friendship bridge to communicate with neighboring
country that is the important factor that make our company interest to invest at that area because
it is an opportunities to built mage project that support investor or local people for the
convenient.
For production and operation analysis, our business has three main products. The product
is about house including other convenient service that supports the expectation of customer.
For marketing analysis, we analyze for political, economy, social, environment, and
technology. And we analyze more about competitor, customer, and competitive. We think about
STP analysis, 4P analysis. We set product, price, place, and promotion. Sales forecast and profit
estimation are increasing every year. Then, we know that we will get more profit and our sales so
good. For risk analysis is the ways to prepare handle with problem that will be happen and find
to process to decrease problem. From analyze risk in our company; there are shows both internal
factor and external factor of risk that can happen with company.

Content
Page
PART 1 INTRODUCTION
Chapter 1: Introduction

-Background and Significance of the Project

-Project Objective

- Benefits of Project

-Activities/Time Frame

10

Chapter 2: Industry Profile


-Nature of Industry

11

-Situation of Industry

14

-Product/Service

15

PART 2 MARKETING
Chapter 3: Market Feasibility Study
- Market Analysis

21

-General Environment Analysis

21

- Competition Analysis (3C Analysis)

26

-STP Analysis

33

-Marketing Mix Strategy

35

-Sales Forecast/Profit Estimation

40

-Marketing Expenses (Sales Incentive)

47

PART 3 TECHNICAL ANALYSES


Chapter 4: Investment Cost

Page
-Pre-Operating Cost

48

-Location

55

-Facility Layout

56

-Machine/Tools/ Equipments

58

-Depreciation

67

Chapter 5: Production and Operations Analysis


-Product Characteristics

71

-Production/Services Process

76

-Operating Cost

77

-Facility Management

80

Chapter 6: Administration analysis


- Management Analysis

83

-Conclusion

100

PART 4 Financial and Risk analysis


Chapter 7: Financial Analysis
- Financial Assumption for Business.
* Profit/ Loss Statement

102

* Cash Flow

107

* Balance Sheet

112

Chapter 8: Risk Management


-Identifying a list of potential risks.

115

-A risk management.

118

PART 5 Project summaries


6

Page
Chapter9: Summary

125

Chapter1Introduction
1.1 Background and significance of project
Currently, a village that is very popular due to consumer demand, there is much to
do in this business is so popular and attractive for investors. People want to have at home
to create a safe and comfortable for own because home is the place where people need to
live and survive. Therefore, the design of the village, we must be able to satisfy and
comfort to customers as well.
Housing business.
Housing is a low-rise residential building, including detached, semi-detached, townhouse
and commercial buildings, which have a different house means a building housing a
wood and brick from the first floor, second floor or more, which is not attached to the
wall of the neighboring house.
(1) A semi-detached or row house that is only 2. They used to live and be a part of the
side that does not require the same input and output of each unit separately.
(2) Townhouse means a building constructed with fire-resistant or non fire-resistant
materials. An adjacent room from a long line 2 or more and use a room to live and not
more than 3-storey building.
(3) Commercial Building. The use of commercial buildings, and industrial services.
The building is less than 20 meters from a public road, which may be used for the
purpose of commerce.
(Source: http://lib.stamford.edu/myfile/305.pdf)
Our project will focus on Chiang Khong District of Chiang Rai Province. This district
is characterized by flat terrain interspersed with mountains and the eastern part of the area
next to Meakong River and the opposite site is Laos. Chiang Khong district has many
attractions such as the Huai Meng waterfall, Point of view between the two sides of the
Thailand Laos. Currently Chiang Khong district has a number of both Thailand and foreign
tourists are more interested in building housing starts have increased even more.
So, We can see the growth of Chiang Khong District because based on data reported
that around year 2558 Thailand will be cooperate with nine countries are Myanmar,
Malaysia, Indonesia, Philippines, Singapore, Vietnam, Laos, Cambodia and Brunei by use
the name is Asean Economics Community they have the purpose for asean can move goods
between countries easier, service are standards, investment are freedom between
international, labor skill are development and get quality, freely in various areas and create
financial freedom in the group country.According to their mission point out to Chiang Khong
District as well as the land, transportation, development, and international business bridge
8

between Thailand and Laos made a province. Now, In chiang Rai had the project of Thai
Laos Friendship Bridge at Chiang Khong District area for make the relation to trade and
tourism we expected that in the next few years Chiang Khong District will be development
and growth of the business are increase in the area of Chiang Khong district.
1.2Project objective benefit of project activities/ time frame
Project objective
1. To analyses the competitive of real estate business in Chiang Rai for support AEC.
2. To analyses the market and industry feasibility.
3. To analyses the finance feasibility.
4. To analyses the profit of estate business.
5. To analyses the return on project.
6. To analyses the risk of project.
7. To analyses the trend of real estate business.
Benefit of project
1. A benefit of this study.
2. Knowing the processes work well.
3. Preparation of plans and operations knowledge.
4. Realize the way to compete and strategy for against competitors.
5. Recognize the demand of housing market in Chiang Rai.
6. Know about marketing problem those occur in business and solve the problem in the real
situation.
7. How to solve problems in real situations.

Activities/Time Frame
Time ( Year/Month )
Activities

Nov.

Dec.

2012

Jan.

2012
1

Feb.

2013
1

Topic
Submission
Introducti
on SubmissionIntroduction to
project feasibility
study
Study the
business profile
Market
Analysis
Productio
n and Operation
Analyze
the financial
Study and
management the
risk of our
business
Project
Advertising
Writing
the report
Presentati
on and conclusion
the feasibility of
business

Figure:1.1

10

2013
1

Chapter 2: industry profile


2.1The nature of real estate
In Chiang Rai there are a large number of used homes for sale at prices much cheaper than you
would pay in a Western country. You can find great bargains but you can also end up with an
expensive headache if you do not look out for potential problems. Here are some tips to help you.
o

Make sure the house is not in a flood zone.

Look for small cracks in the walls.

Look at the ceilings for water damage. The most common problem we find is a roof that
leaks. Whether it is a severe problem or minor problem, it needs to be taken care of
before you purchase the house.

Look for termite damage.

Check the water supply. Some areas of Chiang Rai have city water but just outside the
city everyone depends on well water. The city water supply is not bad but pipes do break
so having a back-up well is a good idea. If you are buying a house with well water, test it
thoroughly, especially in the dry season, when the water tables are lower.
For the areas of Chiang Khong, it have a complete supply that will response the needs of
the customer who would like to buy a house, but the weakness of our village is it so far
from downtown only.

(http://www.lannarealty.com/)

As dependent variable.

Real Estate prices depend on the economy. In times of economic downturn, Real estate
prices to fall but in time of recession. We may have heard people suggest that we should promote
the development of real estate to create employment and economic recovery in the end because
people will buy if when we have plenty of money. In times of recession people buy a
professional. It has only speculators would only wise and knows that property prices in times of
extreme depression. In the truth is an economic variable as real estate and economic conduct
separate property

To change soon

Real estate is not stock price change both positive and negative behind conversion of
money even more difficult. Notice will that after the devaluation of the baht on July 2, 1997
stock price vertical cliff, economic disruption but it also has launched two new real estate lots
(Because it was preparing to launch before then it cannot stop on time). So real estate holdings

11

are at risk than a deposit in the bank. However, if considered then living by holding it
worthwhile to.

To reflect the wealth of the country and people.

If any country has real estate holdings spread very well, it shows that the equality in the
allocation of resources. The people holding these assets cause to feel more ownership of the
country. In case of the general public, real estate is like gold. In that it can be used to display
their wealth but real estate even worse in terms that are difficult to convert to cash or slower. It
can take advantage of the adjustments, it didnt have value in exchange and value of living wage
well.

To people in the Country is important

Most property is residential. Thai people who are living with most of them are generally
persons. Foreign investment will come to Thailand for rent is still difficult. Against investing in
shares or otherwise would more than cost. So, idea that sells property to real estate to foreigners
therefore quite difficult.

No one can dominate the market

In case of consumer products such as consumption of soft drinks continue to dominate


the market. However, if property cannot be done, research and information center Property
Valuation Thai Co., Ltd. The Agency for Real Estate Affairs (www.area.co.th) has discovered
that largest real estate companies lead the market only 10% of the remaining scatter general.

The exact cycle

As well as general business, Real estate is the exact age in Boom Generation or Boom
period to slow decline and renaissance era around a cycle lasts about 10years. For example,
enough economic growth, demand has increased. Plant growth was the purchase of land and
factory building machines to order and of course new capacity is planned to be available for
performance. Then if it enough already expanded while it will probably to stop until competence
is reached to add more. Itwill be prolonged again.
(Source:http://www.thaiappraisal.org/thai/market/market_view.php?strquery=market273.
htm)
2.1.1The truth about real estate
In nature, real estate is a Dependent Variable to the Independent Variables is much like
many economic, social, political popularity, etc. The property is a type of property. People are
interested when they have money as well as economic, for example gold, diamond, car, resort
and other owned real estate. In times of awful economy, nobody is buying and may be more
12

sellers. Many people may have to remove the mortgage assets for alleviate the economic crisis
affecting the self.

2.1.2The basic principles that people buy property


The basic principle that people buy property is in addition to buying and decorating
prestige but they expected to buy for two other things. There are1.Prices is expected to increase
profit: Capital Gain and Return of investment2.Interest is expected from the acquisition: such a
lease can be released or referred to as Return on investment
2.1.3Factors of buying a house
Main issue that makes people buy house is make them feel worth to buy. Now situation,
the customers can saw that it was not the price. They will not buy because it is not worth such a
way to make people feel worth buying something like this.- Price usually about 1 million, if in
case we can sell at price cheaper than the market as only eight hundred thousand. In nest three
year, price is still a million people to buy any profits from first day at rate of return 8%. In the
other ways if buying property is the price of eight hundred thousand at the rate of return of 8%
per annual for 3 years. The property will grow money in 1 million. The lease indicates that if we
buy property in 1 million baht. If the return in rent at 5% per year, it still better than money in
bank deposits yield only 1-2% in a year. It can indicate the cost is effectiveness for essential that
the buying and selling the property.
2.1.4How gain profit from this business
We can profit from crisis. Generally, lower property prices will reach the critical but
often the rent price will not much decline. It makes higher rate of return and encourage people to
buy property. For paradigm, when our normal selling price of a million but in times of crisis may
remain eight hundred thousand or less 20%. In case for lease, 1 million baht property may be
rented out to 8 billion baht per year or a return of 8% per year. The crisis situation, rental may
deteriorate but decreased at a rate that less than the price. The rental price may be reduced to 7.2
billion baht per year which yields rise to 9% per annual. If the crisis is very stress, rate of return
is even more opposite to decline price. So, if we can buy lower price property gain precedes
about 15% per year with our own house or condominium in the unit. It approximates something
like 5% in return. We will get return up to 20% per annual above the bank deposit in the crisis
situation. We are still making a profit and the owners property can still sell the property.
Therefore, living in the real estate investment affords opportunities. As an abilities of our
investment and dont forget that investment involves risk. We must learn to diversify. Just in
case, if some of the property purchased.

13

(Source:http://www.thaiappraisal.org/thai/market/market_view.php?strquery=market304.
htm)
2.2Situation of industry
Current situation of real estate industry big company have project to expand to other big
province in each region than Bangkok, because Bangkok cannot expand than this from limit of
area, so from this factor it make other big province in each region is the good point to invest in
new market, such as C.P. land company have plan to invest real estate project in other big
province both condominium and village, C.P. land company have plan to divided to 5 zones and
Chiang Rai is province that C.P. land have the plan to invest in real estate project too. Thai bank
have information land price in Chiang Rai will increase rapidly in the near future, it is effect
from strategy open free trade with neighboring country in Mae Khong sub-regions such as
China, Laos, and Burma so Chiang Rai chamber of commerce plan to set up real estate
development center to support and collect data for investor have enough information before
invest. Dr. Thawatchai Yongkittikul secretary of association of Thai Bank said from house fair at
big C Chiang Rai in year 2008 is the big effect to stimulate economic and invest of real estate
industry in this region it make resulted in turnover and reduce NPA in commerce bank, it make
people have many choice to invest in real estate in Chiang Rai, and the price of real estate of real
estate in Chiang Rai not expensive such as home with land low price is around 100,000Baht to
3,000,000Baht, so it is opportunities for investor to invest, because Chiang Rai is the economic
area with neighboring country and have many tourist destination. Mr. Patthana Sittisombat
manager of Chiang Rai chamber said economic of Chiang Rai will growth in every part because
Chiang Rai have area connect with neighboring country such as Burma and Laos, and Chiang
Rai is the important way that China use to communication and logistic product for separate
product to Bangkok and go to port for transfer product to other country in ASEAN by use R3A
road project from China to Laos and come to Thailand by Thai-Laos friendship bridge to Chiang
kong district, and have R3B road project from China through Burma to Thailand at Mae Sai
district and this road will be important way to logistic in the near future, but cargo ship in Mae
khong river is the most important way to transfer product from China to Thailand too, because at
Chiang Kong district have big port to support product from China, from this factor make Land
price near Mae khong river will increase rapidly in the near future so from this factor it make
many investor go to invest in Chiang khong district. Now a day land in Chiang Kong district in
border of Thailand and Laos area and near Thai-Laos friendship bridge price of land is increase
higher than the past from 200,000baht to 700,000baht per1 rai, and Mr. Patthana Sittisombat said
Chiang Rai chamber have project to open real estate development center for combine real estate
group to develop in good way for set standard, system, and keep data for management risk before
investment, and from this for protect economic crisis from land sale similar with the past in
Bangkok. This is all factor that make many company come to invest in real estate industry in
Chiang Rai, and Chiang Kong is district that investor interest to invest, although from data in the

14

past Chiang Rai is not the place that investor interest to invest in real estate industry, but from
above investor cannot see through Chiang Rai to invest in real estate industry.
(Source: http://www.boybdream.com/manager-news-content.php?newid=20301)
(Source: http://www.dailyworldtoday.com/columblank.php?colum_id=77447)
2.3.1Product
This is beginning of new imagination of house. Modern empire village is name of our
house that likes a civilization of empire. There are almost 50 companies in Chiangrai doing
single detached house business, so that made us to find out for the new ways for customer. The
Modern empire village is a perfect mix contemporary, modern empire design with simple and
Thai-style elements, so you can being life with better community. The villa will locate in
Amphor Chiangkong, Chiangrai area about 34 Rai for establishes. As an around there will be
natural environment very good view. Its appropriate for every one love peaceful, workout, party
ETC. Our place far away from downtown 100 KM, but this is easiest way to connect with
another country such as Lao, China and Myanmar for businessman want to contract any
business because they are going open AEC in the next 2 year. Our villa is a good choice for
someone looking for Modern villa
We separate home that in 3 satisfactions.
Type A. There are 200 SQM 3 bed rooms, 3 bath rooms, 1 parking.
Price: 2.15 million baht

Figure2.1

15

Type B
There are 240 SQM 3 bed rooms, 3 bath rooms, 1houskeeping room, 2 parking
Price: 2.75 million Baht

Figure2.2
Type C. There are 302 SQM 4 bed room, 5 bath rooms, 1 housekeeping room, 2 parkingPrice:
3.05 million baht

Figure2.3
2.3.2Service

16

2.3.2.1. Fitness
Our village will provide fitness centre. The fitness centre has equipped with high quality
equipment. All equipment has standard and safety. Moreover, we will have personal trainers who
provide the support you need to reach your fitness goals.

Figure2.4
(Source: http://www.hotelthailand.com/nonthaburi/richmond-stylish-convention/facilities.html)

2.3.2.2. Swimming pool


Our village will build standard swimming pools. It has two pools for shallower children's pool
and adult. The swimming facilities have lockers for clothing and other belongings. Moreover, we
will have staff who ensure health and safety standards.

Figure2.5
(Source: http://pooldesignideas.blogspot.com/2012/11/swiming-pool.html)

17

2.3.2.3. Playground Island


We will have a secure and beautiful area with creative playground for kids. All toys made
from plastic. It has high quality and standard. We guarantee of security when your child plays it
but child is under your control and take care too.

Figure2.6
(Source: http://www.miamicondolifestyle.com/fisher-island-condos.php)

2.3.2.4. Garden
We will set garden for human relaxed. The garden that makes people does activity with family in
the outside. And we have gardener who care and improve in everyday.

Figure2.7

(Source: http://www.neilinnes.org/georgegarden.htm)

2.3.2.5. Guardhouse
We will provide the security guard to protect around the village. It takes to 24 hours for ensure
the safety of families. We will make confident and trust when they live in this village and get the
convenient.

18

Figure2.8
(Source: http://www.beltoncommunities.com/westwingresidencesatetoncity.htm)

2.6Strategies of the company


-Corporate Strategy
Now a day immovable property is popular in Chaingrai because In the next 3 years Thailand and
another country will open AEC. We decide to establish in Amphor Chaing Khong because that
so close form Lao just 130 km., Kuhn Ming1,200 km.,So Chaingrai have to develop them self
for support in next 3 years. We decided to operate under Growth strategy because these
strategies support our new business pretty well.
The business will following in concentric diversification to provide the new technology,
modern style in housing estate, We can design customers house for each specific ex: some
family need more room some family need more space for yard and importance thing is customer
we are focus on businessman working with neighbor.
This is the reason we select these strategy suitable for Modern Empire villa .However the
company be able to get the most profit and improve to be famous in Thailand.
-Business strategy
Modern Empire village is a business that focuses on target group of businessmans customer.
Businessman comes to contact international business or often move to Thailand for long term.
Because AEC will open that increase economic growth in Asian. Thailand is a center point of
member country in ASEAN. Our business is a main factor for do international business. It is
good effect for other business too. And we will provide quality service and standards that have
evolved over time.
-Financial Strategy
The company will prepare the several of financial statement to be clear and accurate every month
and always improve the accounting system to be standard.
19

-Human Resource Strategy


The company will focus on the enhancement and personnel development that is a good basic
factor. We are hiring the employee that is a good skill by divide them in several division, and
then assign the appropriate job to our employee. Moreover, thecompany always training the empl
oyee to effective working and evaluate the performance.
- Operation strategy
The company will focus on complete service to provide the convenient and customer satisfaction
and working standard.

20

Chapter 3:Market Feasibility Study


3.1General Environment Analysis
-Political
Chiang Rai have state highway connect with Myanmar and in the future the government
have planning to do new state highway number 4 connect to Laos then Chiang Rai become to the
popular province that many people and government want to invest. Map of Southeast Asia.
Countries are likely to invest in Thailand.

http://english.cri.cn/3126/2006/09/03/961@134350.htm

21

http://www.thaifinbiz.com/sme_detail.php?tab=4&smes_id=3475

22

-Economy
The current economic is expansion of the Chiang Rai province. A growing number of
tourists are due to Chiang Rai is considered the gateway to Myanmar, Lao PDR, and China.
Chang rai have many nature resources and have boundary connects with other country it make
Chiang Rai can rapid growth.

Thailand GDP 1980 to 2010 (Source : World Bank)

23

GDP growth rates in different regions of Thailand (2001 GDP set to =100).
Notice that Northeastern and Northern Region show growth despite overall downturn in 2009.

http://www.thaiwebsites.com/thailand-GDP.asp
The fundamental problem is the way GDP is generated throughout the country.
Agriculture which employs 42.6% of the labor force generates only 11.4% of GDP. While
industry employs about 20.2%, it generates 44.5% of total GDP. Services employing 37.1%
generate 44.1% of GDP. Overall, prices for rice and other farm produce are related to market
forces, and to a large extent beyond government control. Better education may have benefits in
the long term. In 2007, indicated that a lot of the provided funds were spent on consumption, and
not on measures creating sustained income gains. Of particular worry is that political parties in
Thailand are not ideology based, and there would be a substantial gain for the poor and farmers if
a reliable 'Labour' Party could be established. Needless to say, the income disparity that presently
exists and will continue to exist for a long time has negative social and political effects. For a
substantial overview of the Thai economy (latest report 2009) overall and in the provinces, check
out this NESDB file. Hopefully the link stays active. More Data: GDP data for all the Regions
and Provinces of Thailand

24

-Social
North people like to live in big family, peaceful, have own language kum-mung, this is
charming that make people want to go to north. Nowadays changing in social value and expand
of the city, young people have tend to live along in apartment or rent home, and many people
migration to north, that make hard to fine habitation and higher living cost in Chiang Rai. For a
higher dormitory and housing estate is one of interesting business.
-Environment
As the main cash crop of the province is rice, the most important natural resources in
Chiang Rai are its water and soil. More people in Chiang Rai Province earn their living through
agriculture than any other occupation or business; some offer garden crops for sale at roadside
stands.
Vibrant cash crops include Arabica coffee, tea, mangos and potatoes. Along with its many small
mountains and rivers, Chiang Rai has much flat land suitable for farming. The 5 or 6 month long
rainy season promotes rapid plant growth and ensures a good water supply.
Although people produce much pollution, here mostly through their motor vehicles, the air is
cleaned by the abundant vegetation and ample rainfall, and is often cool. Average elevation is
560 meters, 78% of the terrain is mountainous.
-Technology
In a few year Chiang Rai have rapidly growth in technology section the most of people
have better living life and Chiang Rai become to outpost when Thailand have a member of AEC
that is the way to improve technology to contest with neighbors country.

(Source: http://www.thaifolk.com/doc/northen.htm)
(Source: http://www.chiangraiprovince.com/guide/eng/33.htm)
(Source: http://en.wikipedia.org/wiki/Chiang_Rai_Province)
(Source:
http://th.wikipedia.org/wiki/%E0%B8%88%E0%B8%B1%E0%B8%87%E0%B8%AB%E0%B8
%A7%E0%B8%B1%E0%B8%94%E0%B9%80%E0%B8%8A%E0%B8%B5%E0%B8%A2%E
0%B8%87%E0%B8%A3%E0%B8%B2%E0%B8%A2)
25

(Source:
http://th.wikipedia.org/wiki/%E0%B8%A0%E0%B8%B2%E0%B8%84%E0%B9%80%E0%B8
%AB%E0%B8%99%E0%B8%B7%E0%B8%AD_(%E0%B8%9B%E0%B8%A3%E0%B8%B0
%E0%B9%80%E0%B8%97%E0%B8%A8%E0%B9%84%E0%B8%97%E0%B8%A2))
(Source: http://www.thammasatu.net/forum/index.php?topic=2328.0)

3.2 Competition Analysis (3C Analysis)


3.2.1Competitors Analysis
In housing business, it is high competitive business market. There are many competitors in the
market because housing business isnt saturated. The housing business trends to create a logo
and unique brand in the market by creating home to meet the need in customers needs. In term
of home quality, price and other factors that direct effected to residents. It also holds a variety of
promotions to attract the customers. Most of our competitors in Chiang Rai might be a good
location that near to main road, easy to contract for business and, transportation. The customers
know as well as in the large project because it can respond to the needs of residents, more
experience in the operation and service that can attracted to the attention group of customers. For
example

Karnsiri@namlao village

Figure3.1: Karnsiri
(Source: http://www.karnsiri.com/namlao/#/home)
Owner: Karnsiri Properties Limited

26

Address: 24 - 20 Viang Chai district Chiang Rai 57210


Product
-

Kransiri is village in resort style that concern in nature it is the simply way of life of
human, so this is the concept Basic Human Need, and Karnsiri concentrate in Ban all
of pollution for nature care, provide activities place, and playground for kids. Karnsiri
is the Oriental Nature Style structural design that makes air flow in house for reduce
electricity fee. Karnsiri use material from SCG that concentrate in nature, and have
many facilities provide such as Club House Laundry Minimart Fitness, and standard
swimming pool in spa style.

Price
-

No
.
1
2
3
4

Karnsiri @ Nam Lao Provide many style to response their customer to make more
choices for them.
Style

Karnjinda
2bedroom3bathroo
m
Karnpisit2bedroom
3bathroom
karnpicha3bedroo
m3bathroom
karnpudist3bedroo
m4bathroom

Area

Price

Reser
ve
Price

Conta
ct
Price

Down
pay

Bank pay

Example payment periods


20 y

25y

30y

120sqm

1,790,000bht

10,000

50,000

119,000

1,611,000

12,733

11,645

10,990

130sqm

1,980,000bht

10,000

50,000

138,000

1,782,000

14,085

12,881

12,157

165sqm

2,290,000bht

10,000

50,000

169,000

2,061,000

16,290

14,896

14,060

258sqm

3,390,000bht

10,000

50,000

279,000

3,051,000

24,115

22,053

20,814

Figure3.2

Place
-

Nearby Nam Lao River use sri viang road to Bandai intersection go 300 m. built in
left hand site far from city 8 km.

Promotion
-

Free wallpaper
Free underground pipe system for termite protection
Heat- reflector foil insulation under the roof
Chance to win a big gift Nissan March

(Source: http://www.chiangraifocus.com/forums/index.php?topic=135887.0)

27

Rattanaburi Chiang Rai

Figure3.3: Rattanaburi Chiang Rai


(Source: http://www.sahaprop.com/)
Owner: Saha-phaiboon properties limited
Address: 187 m.11 Criang Rai Viang Chai road Viang Chai District Chiang Rai 57210
Tel. 089 4309988 / 085 6249338
www.sahaprop.com
home@sahaprop.com

28

Product
-

High quality house in modern style, far from main road 5 km. and give 10 confident for
customer such as house finish before sales and much more to support customer need.

Price
Home Area
Home Design

R115 3bedroom 2
bathroom 1carpark
T1603bedroom
3bathroom 2carpark
Tayawadee3bedroom
3bathroom 2carpark
T2103bedroom
3bathroom 2carpark
Mantrini4bedroom
4bathroom 2carpark

Land Area

Price Land
+ House

15%
down
payment

Deposit

Contract

7x
monthly

Value at
transfer

Sqwa

Sqm.

130

60

240

2,320,000

348,000

50,000

120,000

25,429

1,972,000

170

60

240

3,195,000

479,250

80,000

200,000

28,464

2,715,750

210

64

256

3,395,000

509,250

80,000

200,000

32,750

2,885,750

250

64

256

3,895,000

584,250

100,000

250,000

33,464

3,310750

210

60

222

4,320,000

640,000

120,000

250,000

39,714

3,672,000

Figure3.4
Place
187 m.11 Criang Rai Viang Chai road Viang Chai District Chiang Rai 57210, far from Chiang
Rai city 5 km.
Promotion
-

Free built in kitchen


Free air condition
Free Mosquito wire screen
Free water heater

Sinthanee Property

Figure3.5
(Source:
http://www.sinthaneeh
omes.com/th/sinthanee-

29

project-9-premium.html)
Vision Chiang Rai Sinthanee will be the leading quality real estate company, providing
excellence in housing construction with outstanding architect designs, surround by safe and
healthy living environment.
Mission
-

To select high quality materials for housing construction.

To design unique and modern houses by giving high importance to function and design,
utilizing the home space most effectively.

To enhance better life, family quality of life, and social life for your loved ones
in a safe, cool, and pleasant natural environment.

To provide professional and experienced staff.

To provide customer care and after-sales service.

Figure3.6

(Source: http://www.sinthaneehomes.com/en/project.html)
Place
- This project stay on the main road and near with downtown Chaing rai and far away from
Mae Fah Luang about 11KM.
Product
- The most recent in design, by Sinthanee Properties, utilizing the new technology, enabling
a reduction in costs, while continuing to maintain standard of quality that is superior,
pleasing, and brimming with warmth and comfort, at affordable prices. Place construction
30

system is a method of construction that involves steel enforced concrete that is modeled and
formed at the actual work site. The steel enforced concrete walls are designed to support the
pressure that would normally be imposed on the pillars and beams, reducing the amount of
time and labor required in the construction of pillars, beams; among numerous other benefits,
making this the increasingly preferred method of construction
Price

Figure3.6
(Source: http://www.sinthaneehomes.com/en/project.html)
Sinthanee Property has 2 choices for customer
One-storey home
Designed to respond to the needs of modern family lifestyle with 3 bedrooms, 4 bathrooms, 1
living room, 1 workroom and 2 parking lots. Total building area 319 sq m
Price:4.5 Milion

Figure3.7
(Source: http://www.sinthaneehomes.com/en/project.html)
Two-storey home
31

Designed to respond to the needs of private and convenient living, which are harmoniously
combined with the natural surroundings of the home. This home is composed of 3 bedrooms,
4 bathrooms, 1 living room, 1 kitchen and 2 parking lots. Total building area 279 sq m
Price: 4.9 Million
Promotion
Sinthanee Property doesnt have any promotion to customer. It is
Disadvantage of this project. Because they think they are the best housing develop in Chiang
rai it make them dont successful in their goal
(Source: http://www.sinthaneehomes.com/)
3.2.2Customer analysis
Modern empire village using customer analysis following by 4 steps:
1. Who is our customer?
-We will separate our customers into gold, silver, and lead groups based on how much profit we
expect them to contribute following by 3 type of our housing that we separate them in 3 groups:
type A type B type C. We need to know what type of customer appropriate which one? We
should have a good recommendation. First of all we need to identify in each one person suitable
which type. Type A suitable for someone like to relax in country not objective for business. Type
B suitable for the people often to do business cost border Type C Good for people has their own
business because they have to contract with China, Lao and Burma and they will bring their
family to be here because that made them convince to connect with any people.
2. What do they want from us?
-Objective is the important thing to response what do they want. We provide a good atmosphere
to them because we concern about customer feeling, emotion both is a important things for make
them to select Modern empire village, moreover we also have other service to
enhance health, safety and there are security for take care customer 24 hours. There are sport
center for support everybody want to work out.
3. When customer will begin think about buying?
-Now a day it almost 2 year they are going to open AEC So, there are people some group such as
businessman, investors and officer looking for house to the future. Moreover need and income
are the necessary things to make decision.
4. Where do they find us?

32

- We will made advertising following television, radio, newspaper and set up a booth in the
department store.
-Chiang Rai has a total population about 1,227,317 people divided for male 606,775 people and
female 620,542 people
(Source: http://www.dopa.go.th/xstat/pop51_1.html)
3.2.3Competitive Analysis
Analyzing competitor to response needs of customer in the same group and know strength and
weakness of competitors for advantage comparative to be the winner such as make something
different for attractive customer and also have a good quality but inexpensive. New
entrepreneur that just do business about housing development is lack of the qualification to do
the business. Consumer cannot to distinguish which one is not professional. Therefore, the
company is profession must had network and guiding to develop the business of housing
development for preventing unfavorable.
So, Modern empire village is the housing development and it is the new choice for customer that
looking for high quality house by high professional teamwork.
We have many social network to help customer to design their house for response customer
need ,solve the problem that customer face it and made high satisfaction to customer for create
famous and reliability in the future by word of mouth or something like that
(Source: http://www.techrepublic.com/article/how-to-analyze-competition-for-in-housedevelopment/1062086)
3.3STP Analysis
3.3.1Market Segmentation
STP Analysis
Market Segmentation
1. Segmentation
Segmentation of market for customer is divided to Geographic segmentation, Demographic
segmentation, Psychographic segmentation, Behaviorist segmentation.
Geographic segmentation.

33

Geographic are important for project and we choose Chiang Khong District because of trends in
the development and growth is the area of Chiang Khong District can be connected to Laos and a
plan developed to prepare to the ASEAN Economic Community or AEC.
Demographic segmentation
Modern empire village suitable for those with income below $ 20,000 and an interest
home modern style in located of Chiang Khong district may be intended for the business to
invest or work in the area and who want to buy a house to live for rest
Psychographic segmentation
Modern empire village is modern empire design with simple and Thai-style
elements an around there will be natural environment very good view and we has many service
of customer such as Fitness pool Playground Island Guardhouse etc. Life styles of our
segmentation are appropriate for the people who interest our style village
Behaviorist segmentation.
We consider from an interest in the form of a village. We have 3 different designs to
meet the needs of the customer.
Target Market
From analysis we choose our target is investor and local people an interest home modern
style in located of Chiang Khong district may be intended for the business to invest or work in
the area and who want to buy a house to live for rest, because in 2015 AEC will open and Chiang
khong have the way to connect with Laos by Thai-Laos Friendship Bridge and port for support
logistic product from China this factor that make investor interest to invest in Chiang khong , so
our target is about investor that want to have house for live and can adapt to home office too.

Gender
Age

We focus on both of sex because they have the same needs.


We will focus on over 30 years old, according to most of people in this period
they have to work and has a steady income.
34

Career

Employees, investors, People with a family of small, medium, large.

Income

Those with income below $ 20,000

Position Analysis
Design and location of the construction of the village is considered to be important for
the designer to provide design and locations that meet customer needs and are comfortable in all
aspects such as the size of the space, amenities for convenience, the environment and the image
surrounding villages. We focus on the design Modern style and the area to full capacity. Include
with facilities as bedroom, bathroom, kitchen room, and living room.
3.4Marketing Mix Strategy- Product
Our Product is sale land and building. House is one of basic need. Its important thing for people
in this world. All level of people need to have own house. Our company has 3 choices 3 house
style for customer.
We separate home that in 3 satisfactions.
Type A. There are 200 SQM 3 bed rooms, 3 bath rooms, 1 parking.
Price: 2.15million baht

Figure3.8

35

Type B
There are 240 SQM 3 bed rooms, 3 bath rooms, 1houskeeping room, 2 parking
Price: 2.75 million Baht

Figure3.9

Type C. There are 302 SQM 4 bed room, 5 bath rooms, 1 housekeeping room, 2 parking
Price: 3.05 million baht

36

Figure3.10
3.4.1First, Neo modern style type A
We set 3 bedrooms, 3 bathrooms, parking a car. This is a comfortable home, closed
to nature and Emphasis on energy efficiency. About veranda have seating it
Continuation of the car park. It does can be bedrooms. In the living room has a glass window;
Big Bay Window corner. Dining room and kitchen room have to
separate for c o o k i n g a n d w a s h i n g . U p s t a i r s i s d i v i d e d i n t o t w o m e d i u m s i z e d b e d r o o m s a n d another room, a bedroom for privacy, because it has a
bathroom and dressing room. Veranda have big Bay Window and awning on the
back bedroom we can put an air compressor is placed. Roof on the top is Sky Light. Size of
the house width 8.80 m 11.00 m depth
Downstairs:
- Large entrance. Next to the car park (Size 2.00 x 3.50 m).- A large living room (size 3.70 x
4.70 m).- Dining room (Size 3.20 x 3.50 m).- Kitchen (size 2.50 x 3.00 m).- The Pantry Food
Preparation (Size 1.30 x 3.00 m).- Toilet (Size 1.60 x 2.00 m).- Storage room under the stairs
(Size 1.00 x 2.00 m).- Yard washing and drying clothes (size 1.50 x 3.20 m).-Parking spaces
with a storage room (size 3.00 x 5.50 m)
Upstairs:
- Private bedroom, the dressing. Porch (Size 4.20 x 6.20 m) - Bedroom 2 (Size 3.00 x 3.20 m).Bedroom 3 (size 3.00 x 3.00 m).- Bathrooms for the bedrooms upstairs (Size 1.80 x 2.00 m).Porch of Bedroom 1 (size 1.20 x 6.00 m) is used as a place to
a i r compressors.
- Canvas on back bedroom 2 and bedroom 3 (size 0.90 x 4.50 m) is used as a place to air
compressors.
3.4.2Second, Modern resort
Type B
There are 240 SQM 3 bed rooms, 3 bath rooms, 1housekeeping room, 2 parking .The area
inside and outside are continue smoothly. The slantingly in front its closed to near
garage. In the living room have big windows and Continuing to the Kitchen. You can put
counter bar here. Bedroom for your parent and it can be to office, living room for watching TV.
About back it for laundry. It has a big bed room, dress room and bath room for your
privacy. Porch in the font and 2 another bedroom that have porch in large size you can place
asset of chairs. Size of the house width 9.10 m Depth 11.10 m
Ground floor

37

- The entrance corridor (Size 1.80 x 3.50 m) - Airy living room (size 3.00 x 3.50 m).- Dining
room (Size 3.00 x 3.50 m).- Kitchen (size 2.00 x 3.20 m).- The food preparation (size 2.20 x 2.30
m).- Bedroom 3 for seniors (Size 3.00 x 3.20 m) ** can be home theater room or office.- Toilet
(Size 1.40 x 2.20 m).- Storage room under the stairs (Size 1.00 x 2.00 m).- Laundry (Size 1.40 x
3.40 m).housekeeping room(Size )
Second floor
- Bedroom with the dressing and a private bathroom (size 3.50 x 6.50m).- Bedroom 2 (Size 3.00
x 3.20 m).- Bedroom 3 (size 3.00 x 3.20 m).- Hall (Size 2.00 x 2.50 m).- Bathroom for bedroom
1 (size 1.80 x 2.10 m).- 2 bathroom for bedroom 2 and bedroom 3 (size 2.00 x 2.10 m).

3.4.3Third, Modern exclusive


Type C. There are 302 SQM 4 bed room, 5 bath rooms, 1 housekeeping room, 2 parking. The
area inside and outside are continue smoothly. The slantingly in front its closed to near garage.
In the living room have big windows and Continuing to the Kitchen. You can put counter bar
here. Bedroom for your parent and it can be to office, living room for watching TV. About back
it for laundry. It has a big bed room, dress room and bath room for your privacy. Porch in the
font and 2 another bedroom that have porch in large size you can place asset of chairs. Size of
the house width 9.10 m Depth 11.10 m
Ground floor
- The entrance corridor (Size 1.80 x 3.50 m) - Airy living room (size 3.00 x 3.50 m).- Dining
room (Size 3.00 x 3.50 m).- Kitchen (size 2.00 x 3.20 m).- The food preparation (size 2.20 x 2.30
m).- Bedroom 3 for seniors (Size 3.00 x 3.20 m) ** can be home theater room or office.- Toilet
(Size 1.40 x 2.20 m).- Storage room under the stairs (Size 1.00 x 2.00 m).- Laundry (Size 1.40 x
3.40 m).housekeeping room(Size ) .- Bathroom(Size )
Second floor
- Bedroom with the dressing and a private bathroom (size 3.50 x 6.50m).- Bedroom 2 (Size 3.00
x 3.20 m).- Bedroom 3 (size 3.00 x 3.20 m).- Hall (Size 2.00 x 2.50 m).- Bathroom for bedroom
1 (size 1.80 x 2.10 m).- 2 bathroom for bedroom 2 and bedroom 3 (size 2.00 x 2.10 m).
3.4.4 Price
Model
1Style Neo modern
3 bed, 3 bath , 1 parking
2style Modern resort
3 bed, 3 bath, 1houskeeping
room, 2 parking
3style, Modern exclusive

House
(Unit)

Scale
(sq.wah)

(Price/Unit)
(Baht)

200

2,150,000

240

2,750,000

38

4 bed, 5 bath, 1
housekeeping room, 2
parking

302

3,050,000

Figure 3.11
We set our price similar the competitors, not too higher and lower (compare with
similar unit and scales of house). The competitors set price until 2,150,000 to
3,050,000 baht.
3.4.5 Place
We set our project at Chiang Rai because Chiang Rai is in north of Thailand 80 percent of
landscape are forest and grove wood that make weather in there cold. Tourists like to
come to visit, and Chiang Rai has many tourist attractions. That make there have good economy.
Housing business in 2012 at Chiang Rai can show that customer have large unit
of demand. According to News about Money expo Chiang Mai 2010 have demand
more than
10 billion and in 2005 - 2010 north of Thailand have more demand about house.
(Source: http://www.moneyexpo.net/newsite/showdetail_pr.php?id=92)
The location of our project will be in Chiang Khong District because it is
t h e vicinity of Chiang Rai. It isnt far from Laos, As an around there will be natural
environment very good view. Its appropriate for every one love peaceful, workout, party ETC.
Our place far away from downtown 100 KM, but this is easiest way to connect with another
country such as Lao, China and Myanmar for businessman want to contract any business
because they are going open AEC in the next 2 year. Our villa is a good choice for someone
looking for Modern villa
(Source:http://www.guideubon.com/web/viewtopic.php?f=7&t=13580&start=0)
3.4.6 Promotion
Our project will set promotion into three styles.
1. First Style (Neo Modern style)
We set price of this style in 2,150,000 baht.
-free interest in six month and then they pay in normal rate after the promotion.
-Ready to move in.
- Get Furniture + Air conditioner.*
*companys conditions apply.
39

2. Second Style (Modern Resort style).


We set price of this style in 2,750,000 baht.
- free interest in six month and then they pay in normal rate after the promotion.
-Ready to move in.
-Free! Furniture / Kitchen set / Air conditioner*
*companys conditions apply.

3. Third Style (Modern exclusive style)


We set price of this style in 3,050,000 baht.
- free interest in six month and then they pay in normal rate after the promotion.
-Ready to move in.
-Fully furnished houses on the main road*
*companys conditions apply.
3.5. Sales Forecast/Profit Estimation
In the future the government have planning to do new state highway across the Mekong River
then Chiang Rai become to the popular province that many people and government want to
invest. Chiang Khong in the future is expected to be bustling around border with Thailand Burma to Mae Sai district in which the area are available. Then the foreigners need to live in
Thailand increases. The prices of real estate have more expensive and high demand.

40

Table of sale on sale


Priceforecast 1
Plan A
2,150,000
Plan B
2,750,000
Plan C
3,050,000

0
0
0

1
1
1

4
1
1
0

5
1
1
0

year 1 (2013)
Sales volume
6
0
0
0
0
0
0

0
0
0

10

0
0
0

0
0
0

11

12

1
1
0

total

1
1
0

1
0
1

6
5
2

2013
Year

10

11

12

Total

Sales
DownpaymentstyleA

215,000.00

215,000.00

215,000.00

215,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

DownpaymentstyleC

305,000.00

InterestrateA

InterestrateB

215,000.00

215,000.00

275,000.00

275,000.00

64,500.00

64,500.00

82,500.00

82,500.00

InterestrateC

Cost A

2,150,000.00

2,150,000.00

2,150,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

Net sales

8,745,000.00

5,390,000.00

5,390,000.00

41

2,150,000.00

2,365,000.00

2,150,000.00

2,150,000.00

2,750,000.00

2,750,000.00

5,537,000.00

5,537,000.00

215,000.00
-

1,505,000.00
1,375,000.00

305,000.00

610,000.00

64,500.00

193,500.00

165,000.00

91,500.00

91,500.00

2,150,000.00

15,050,000.00

13,750,000.00

3,050,000.00

6,100,000.00

5,876,000.00

38,840,000.00

Table of sale on sale


Priceforecast 1
Plan A
2,150,000
Plan B
2,750,000
Plan C
3,050,000

2
1
1

1
1
1

4
1
1
0

5
1
0
0

year 2 (2014)
Sales volume
6
0
0
0
0
0
0

0
0
0

10

0
0
0

1
0
0

11
1
1
0

12
1
1
1

total
2
1
1

10
6
4

2014
Year

10

11

12

Total

Sales
DownpaymentstyleA

430,000.00

215,000.00

215,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

DownpaymentstyleC

305,000.00

305,000.00

InterestrateA

258,000.00

129,000.00

129,000.00

InterestrateB

165,000.00

165,000.00

165,000.00

InterestrateC

183,000.00

183,000.00

Cost A

4,300,000.00

2,150,000.00

2,150,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

3,050,000.00

11,716,000.00

9,222,000.00

Net sales

5,684,000.00

215,000.00

129,000.00

2,150,000.00

2,494,000.00

42

215,000.00

129,000.00

2,150,000.00

2,494,000.00

215,000.00

215,000.00

430,000.00

2,150,000.00

275,000.00

275,000.00

275,000.00

1,650,000.00

305,000.00

305,000.00

1,220,000.00

129,000.00

129,000.00

258,000.00

1,290,000.00

165,000.00

165,000.00

165,000.00

990,000.00

183,000.00

183,000.00

732,000.00

2,150,000.00

2,150,000.00

4,300,000.00

21,500,000.00

2,750,000.00

2,750,000.00

2,750,000.00

16,500,000.00

3,050,000.00

3,050,000.00

12,200,000.00

9,222,000.00

11,716,000.00

58,232,000.00

5,684,000.00

Table of sale on sale


Priceforecast 1
Plan A
2,150,000
Plan B
2,750,000
Plan C
3,050,000

2
1
1

1
1
1

4
2
1
1

5
0
1
0

year 3 (2015)
Sales volume
6
1
0
0
0
0
0

0
0
0

10

0
0
1

2
1
0

11
1
1
0

12
3
1
1

total
2
1
1

14
8
6

2015
Year

10

11

12

Total

Sales
DownpaymentstyleA

430,000.00

215,000.00

430,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

DownpaymentstyleC

305,000.00

305,000.00

305,000.00

InterestrateA

387,000.00

193,000.00

387,000.00

InterestrateB

247,500.00

247,500.00

247,500.00

InterestrateC

274,500.00

274,500.00

274,500.00

Cost A

4,300,000.00

2,150,000.00

4,300,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

12,019,000.00

9,460,000.00

12,019,000.00

Net sales

275,000.00

247,500.00

2,750,000.00
3,272,500.00

215,000.00

430,000.00

215,000.00

645,000.00

430,000.00

3,010,000.00

275,000.00

275,000.00

275,000.00

275,000.00

2,200,000.00

305,000.00

305,000.00

1,830,000.00

387,000.00

193,000.00

580,500.00

387,000.00

2,707,500.00

247,500.00

247,500.00

247,500.00

247,500.00

1,980,000.00

274,500.00

274,500.00

1,647,000.00

4,300,000.00

2,150,000.00

6,450,000.00

4,300,000.00

30,100,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

22,000,000.00

3,050,000.00

3,050,000.00

3,050,000.00

18,300,000.00

3,629,500.00

14,577,500.00

12,019,000.00

83,774,500.00

193,000.00

2,150,000.00

2,558,000.00

43

305,000.00

274,500.00

8,389,500.00

5,830,500.00

Table of sale on sale


Priceforecast 1
Plan A
2,150,000
Plan B
2,750,000
Plan C
3,050,000

2
1
1

3
1
1

4
1
1
1

5
2
1
0

year 4 (2016)
Sales volume
6
0
0
0
0
0
0

0
0
0

0
0
0

10
1
1
1

11
2
1
1

12
3
1
1

total
2
2
1

16
9
7

2016
Year

10

11

12

Total

Sales
DownpaymentstyleA

430,000.00

645,000.00

215,000.00

430,000.00

215,000.00

430,000.00

645,000.00

430,000.00

3,440,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

550,000.00

2,475,000.00

DownpaymentstyleC

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

2,135,000.00

InterestrateA

516,000.00

774,000.00

258,000.00

516,000.00

258,000.00

516,000.00

774,000.00

516,000.00

4,128,000.00

InterestrateB

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

660,000.00

2,970,000.00

InterestrateC

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

2,562,000.00

Cost A

4,300,000.00

6,450,000.00

2,150,000.00

4,300,000.00

2,150,000.00

4,300,000.00

6,450,000.00

4,300,000.00

34,400,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

5,500,000.00

24,750,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

21,350,000.00

12,322,000.00

14,945,000.00

9,699,000.00

9,699,000.00

12,322,000.00

14,945,000.00

15,677,000.00

98,210,000.00

Net sales

8,601,000.00

44

Table of sale on sale


Priceforecast 1
Plan A
2,150,000
Plan B
2,750,000
Plan C
3,050,000

3
1
1

2
1
1

4
2
1
1

5
2
1
0

year 5 (2017)
Sales volume
6
0
0
0
0
0
0

0
0
0

0
0
0

10
1
1
1

11
3
1
1

12
2
1
1

total
4
1
1

19
8
7

2017
Year

10

11

12

Total

Sales
DownpaymentstyleA

645,000.00

430,000.00

430,000.00

430,000.00

215,000.00

645,000.00

430,000.00

860,000.00

4,085,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

2,200,000.00

DownpaymentstyleC

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

2,135,000.00

InterestrateA

967,500.00

645,000.00

645,000.00

645,000.00

322,500.00

967,500.00

645,000.00

1,290,000.00

6,127,500.00

InterestrateB

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

3,300,000.00

InterestrateC

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

3,202,500.00

Cost A

6,450,000.00

4,300,000.00

4,300,000.00

4,300,000.00

2,150,000.00

6,450,000.00

4,300,000.00

8,600,000.00

40,850,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

22,000,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

21,350,000.00

15,312,500.00

12,625,000.00

12,625,000.00

9,937,500.00

15,312,500.00

12,625,000.00

18,000,000.00

105,250,000.00

Net sales

8,812,500.00

45

Source: http://th.aectourismthai.com/content1/1012
http://lib.payap.ac.th/webin/ntic/newpage/business/strategycr2553_2556.pdf

Figure 3.12
(Source:http://www.manager.co.th/mgrWeekly/ViewNews.aspx?NewsID=9530000045827)
(Source: http://www.manager.co.th/iBizChannel/ViewNews.aspx?NewsID=9550000147172)
(Source: http://www.manager.co.th/Local/ViewNews.aspx?NewsID=9550000150795)

3.6Marketing Expense
There are types of expenses as following:
-Brochure: Naitamtook 1,000 sheet, A4 paper, 2side, 3part, 4color, 2field and 160g. Is about
4,400 baht plush art cost 1,500 baht.
-Radio:
1. GFM 89.75: start with 1,000 baht, free spot and pr every one hour.
2. Xfmnetwork 92.75
3. Lanna Radio Party: On air at 08:00-10:00 on Monday to Wednesday price are 5,000/month
-Baanlaesuan Fair: About 50,000 per year.
(Source: http://baanlaesuan.com/fair2012/index.aspx)
(Source: http://www.xfmnetwork.com/index.php)
(Source: http://www.naitamtook.com/)
(Source: http://radio.siamhrm.com/radio/gfm_89_75_mhz_chiang_mai.php)
(Source: http://radio.thaiza.com/)

46

Marketing Expenses (thousand Baht)


Year1

JA
N

FE
B

MA
R

AP
R

MA
Y

JU
N

JUL

AU
G

SE
P

OC
T

NO
V

DE
C

Total

120

120

120

120

140

140

160

160

120

120

120

120

1560

100

100

100

100

120

120

140

140

100

100

100

100

1320

220

220

220

220

260

260

300

300

220

220

220

220

2880

6
20
5

6
0
5

6
0
5

6
0
5

6
0
5

6
0
5

6
0
5

6
0
5

6
0
5

6
0
5

6
0
5

6
20
5

72
40
60

31

11

11

11

11

11

11

11

11

11

11

31

172

251

231

231

231

271

271

311

311

231

231

231

251

3052

Selling Expense
Sale
commissio
n
Discount
sale
Other
selling
expense
Total
selling
expense

Advertising expense
Radio
Calendar
Other
Total
advertisin
g expense
Total
marketing
expense

Figure 3.13
Conclusion
There are many village in Chaing Rai, for our product are lanna style that is a new choice
for the investor who would like to invest about the fixed asset in Chiang Rai. We are having
three style of house for the customer; first, Neo Modern style, second, Modern Resort style, and
Third Modern Exclusive style. Each style of house we also have the interesting promotion too.
That the price is similar with our competitor, not too higher and lower. So our village is the
good choice for the investors who plan to invest about the asset in Chiang Rai in the time of
ASEAN.

47

Chapter 4: Investment Cost


4.1 Pre-Operation Cost
Office Area
Cost of investment
Land 32 rai Total =16,000,000 Baht

Figure 4.1 Land


Land of The model empire village
Land 32 rai 16,000,000 Baht
4.1.2Billboard of company
6 Meter

THE MODERN EMPIRE VILLAGE


1.5 Meter

Figure 4.2 Billboard of company


Billboard Tax
48

Billboard of The modern empire village make by English font and tax rate of English font is 40
baht per 500 square centimeters and the size of billboard is 1.5mx6m so can calculate 90,000/500
x 40 equal 7,200 Baht.

Document for registration paying tax


- Copy of Household Registration and personal Identification Card
- VAT Registration
- Certificate
- License to set billboard

Logo of the company

Figure 4.3 Logo of the company

We will use name of company same as our project too. This advertisement is w i d e
2.5 Meters and height 4.0 Meters. It is set up under the roof in front of
o u r company. Our logo composes name of company The Modern Empire Village Our logo is
three pillar romans and color is only green. We use green color because that make customer feel
relax when they looking to logo, the word that easy to read and understand.
Rubber stamp of company
49

1.5 Inch
1Inch
.

Figure 4.4 Rubber stamp of company


The rubber stamp, we order from Chaiherun Shop. The shop has location at 28Muendumprakod
Road, Chang Phueak Chiang Mai 50200. Telephone Number is 084-1710123 and Fax Number is
053-226912
1. Made from the rubber tree begin with 120 Baht
2. Made from resin begin with 90 Baht
(Source:http://chaiherun.siam2web.com/?cid=196007)

Registration
Company Limited Registration
Company Limited Registration is that kind of company which is formed with a capital
divided into equal shares, the liability of the shareholders being limited to the a m o u n t
unpaid on the shares respectively held by them. We submit the names
company is The Modern Empire Village for determine not same as the name
reserved other companies. Within three months of the date of the statutory meeting,
the directors must submit the application to establish the company. If not registered
within the specified period, the company statutory meeting shall be void and if
would like to register to establish the company, shall arrange the meeting for persons who
reserve to buy the shares again.
During the registration process, the promoters will be required to supply the
name, license number, and remuneration of the auditor the company is planning to
hire. The company registration fee is 500 baht per 100,000 baht of registered capital. The
minimum fee is 5,000 baht and the maximum fee is 250,000 baht. The directors h a l l t h e n
cause the promoters and subscribers to pay forthwith upon each
50

s h a r e payable in money such amount, not less than 25%, as provided by the
prospectus, notice, advertisement, or invitation. The company is then registered
as a legal entity (or juristic person). If all necessary documents are complete and
duly signed by all promoters, directors, and shareholders, the above steps can be completed in
one day. We take information used to register as follows:
1. Companys name (the same as the name reserved).
2. Locations office (located at province).
3. Objective of the company.
4. Registered capital must be divided into each share with the same value.
5. Name, address, age, occupation and number of shares those people who start up the
company reserve to buy the shares.
6. Name, address, age of witness.
*the more information, you can read in Appendix of Company Limited Registration*
Investment Cost
Equipment & Tools Total of office elements
No.

Description

Number

Price/Unit

Total

1.

Computer

24

24,500

588,000

2.

Printer

2,590

12,950

3.

Scanner

2,090

10,450

4.

FAX

4,290

12,870

5.

Telephone

24

2,090

50,160

6.

Table

20

5,300

106,000

7.

Chair

30

2,599

77,970

8.

File Cabinet

3,100

15,500

51

9.

Document file

3,850

19,250

10.

Conference table

24,000

48,000

11.

Air condition

14,000

84,000

12.

TV

16,990

33,980

13.

TV Table

2,790

5,580

14.

Table

3,800

7,600

15.

Manager Set

9,850

9,850

16.

Refrigerator

4,300

8,600

17.

Water Dispenser

3,990

11,970

18

Faucet

250

500

19.

Toilet hand sprayer

200

200

20.

Microwave

1,790

1,790

Table 4.1

Location: Modern Empire village

52

Figure 4.5 Location of company


http://www.thaihometown.com/photo/image_file2/48817/48817-4.jpg
Location of Modern Empire village was on Phahon Yothin Road 1/AH2, Amphor Chiang
khong, Chiang- Rai Province. From Mueang Chiang-Rai to Chiang khong 115 kilometer. This
location was nearly Amphor Chiang san and Amphor Weaing Kan. This is the easy way to
access it is comfortable to transportation. The area of Modern Empire village is 32 rai or 12,800
square meters.

Figure 4.6 Land


53

http://images02.olxthailand.com/ui/11/34/46/1303447978_191192846_1----.jpg
The area of Modern Empire village is 32 rai or 12,800 square meters.
Land 32 rai Total =16,000,000 Baht

Facility Layout

Figure 4.7 Plan of village

Guard house

54

Figure 4.8 Guard house


http://www.beltoncommunities.com/westwingresidencesatetoncity.htm

We will provide the security guard to protect around the village. It takes to 24 hours for
ensure the safety of families. We will make confident and trust when they live in this village and
get the convenient.

Fitness Equipment
1. COMMERCIAL TREADMILL DK-4719N

Price: 55,900.00 Baht.

2. UPRIGHT BIKR GT-79

Price: 9,900.00 Baht.

3. ADJUSTIBLE ABDOMINAL

Price: 7,000.00 Baht.

4.TWO SATION GYM SET WHG-002

Price: 17,900.00 Baht.

5. DUMBBELL SET

Price: 29,600.00 Baht.

6. TR: NO.35A

Price: 5,000.00 Baht.

7. ELLIPTICAL TRAINER 2IN 1 - GT-63N

Price: 11,900.00 Baht.

Total

Price: 137,200.00 Baht.

Table 4.2

55

Figure 4.9 Fitness


http://www.hotelthailand.com/nonthaburi/richmond-stylish-convention/facilities.html

Our village will provide fitness center. The fitness center has equipped with high quality
equipment. All equipment has standard and safety. Moreover, we will have personal trainers who
provide the support you need to reach your fitness goals.

Swimming pool

Figure 4.10 Swimming pool


http://pooldesignideas.blogspot.com/2012/11/swiming-pool.html

Our village will build standard swimming pools. It has two pools for shallower children's
pool and adult. The swimming pool in our real estate has size in High is 25 mater Wide is
12mater and deep is 1.5 mater. We will use in skimmer structure and system. Building price is
around 1,600,000 baht.

56

Playground

Figure 4.11 Playground


http://www.miamicondolifestyle.com/fisher-island-condos.php

We will have a secure and beautiful area with creative playground for kids. All toys made
from plastic. It has high quality and standard. We guarantee of security when your child plays it
but child is under your control and take care too. it use space 7x10 m. and the size of set
playground equipment is 5.5x 8.0x2.6 m. It is 98, 0000 Baht.
Plan office

Figure 4.1 Office

57

Garden

Figure 4.13 Garden


http://www.neilinnes.org/georgegarden.htm

We will set garden for human relaxed. The garden that makes people does activity with
family in the outside. And we have gardener who care and improve in every day. It has space is
100 x 100 square meter, 600 per square meter so total cost is 60,000Baht, which include big tree,
flower, and other for decorating.

Machine/Tools/ Equipments
Office
Product Description
Computer ACER-E560PD2.8GZ

-Aspire E560 Intel PD 820 (2.8 GHz)


-Hard Disk 160 GB SATA-RAM 512 MB
DDR2
-DVD
-RW 16 X S
-Multi
-Ati Radeon X 1550 Up To 512 MB
-56 K ITU V90 Fax Modem (Internal)
-9 In 1 Card Readers + IEEE1394
-Flat 17 AF 715 Silver Black

58

-Guarantee 1 year
Price 24,500 Baht.
Printer CANON- IP3680

- 9600 x 2400 dpi


- Speed for print white-black 21 paper
-Speed color 17paper/m.- Windows 2000
SP4, XP SP2, Vista-Guarantee 1 year
Price 2,590 Baht
Scanner CANON- LIDE25
-CIS Scan
-Resolution 1200x2400 dpi
-Preview speed 16Sec.-USB 1.1
-Content of Lide 25: USB Cable
-Software Kit (CD-ROM)
-Manuals-Guarantee 1 year
Price 2,090Baht
BROTHER - FAX-837MCS

-Speeds send 9 m/paper


- Send a time 10 paper
- Automatic calls to 104 numbers
- LCD monitor 16
- Memory 512KB-Receive 20 papers

59

-Auto cut paper


Price 4,290 Baht.
Telephone PANASONIC
- KX-TS580MXB

-Guarantee 1 year
Price 2,090 Baht

Table

-Desk size (4 ft)122(w)*66(d)*75(h) cm


Price 5,300 Baht

Chair

Price 2,599 Baht.


Customer chair

60

Price 2,200 Baht.

File Cabinet

Price 3,100 Baht.

Document file

Price 3,850 Baht

Conference table
-Size 3.60m *1.60m* 75cm
-Melamine
-12 chairs
Price 24,000 Baht

61

Sofa

Price 11,900 Baht.

Air condition

-Air wall type


- Size 22328 BTU
- For room size 28-36
-Anti Allergen Enzyme
-7 way air distribute
- Label low fiber 5
- EER 11.39
-Guarantee 5 year
Price 14,000 Baht.

Sharp LCD TV 46 Inches LC-46A85M

- Full HD,1920 x 1080 Pixels


- Contrast Ratio 50000:1
- Brightness 360 CD/M2
- Response Time 8 MS
- Input AV X2,HDMI
62

X2,ComponentX1,RGB X1
-Size 32 inch
-Price 16,990 Baht.

Plasma TV Table Chrome

-w 150 cm d50 cm h60 cm


-Color- walnut/maple/white
Price 2,790 Baht.

Product Description
Table

Price 3,800 Baht.

Manager Set

63

Price 9,850Baht.

Exclusive chair

Price 5,850 Baht.

CameraAVTECH-MDR751
-Record 1 +HD 500 GB, USB Mouse,camera
4, camera stage 4, adapter 4, lineRG-6
(100 m) 1, BNC and AV
Price 13,500 Baht

Kitchen Room
Dinner set

-1Table+4chair size100 cm
-Price 4,300 Baht

Refrigerator

-Size 18.2 queue, 514 liter


-Minus Zero Cooling system

64

-Cool Jet Wrap distributed cooling


- Nano Titanium eliminates a smell
-Tempered Glass.
Price 4,300 Baht
Vacuum bottle

-Size 2.9 liter


Price 795 baht.

Water Dispenser
-Hot-cool 95-6 C
-Size (w x d x h) 14.0 x 13.0 x 20.0inch.
Price 3,990 Baht.

Faucet

Price 250 Baht.

Toilet hand sprayer

Price 200 Baht.

65

Kitchen Room
Lavatory

Price 4,000 Baht.

Microwave: LG MS2029GW
-Capacity 20 Litter
-Power system (microwave): 700 W
-Rotate the tray size 245 mm
-Defrost program
-Power Level: 5 levels
-Scheduling up to 60 minutes
Price 1,790 Baht

Basin tascano

66

-Above Lavatory
Price982 Baht.

Total

Price 175,896 Baht.

Table 4.3

Depreciation

No.

Investment

Amount

Depreciation

Annual Dep.

Monthly Dep.

1.

Computer

367,500

3 years

122,000

10,166.67

2.

Printer

12,950

5 years

2,410

200.83

3.

Scanner

10,450

5 years

2,006

167.17

4.

FAX

12,870

5 years

2,394

199.5

5.

Telephone

31,350

3 years

10,216.67

851.49

6.

Table

106,000

5 years

20,400

1,700

77,970

3 years

24,990

2,082.5

15,500

3 years

4,500

375

19,250

3 years

5,716.67

476.39

Chair
7.

8.

9.

File Cabinet

Document file

67

10.

11.

Conference table

Air condition

48,000

5 years

9,000

750

84,000

5 years

16,100

1,341.67

12.

TV

33,980

3 years

10,193.34

849.44

13.

TV Table

5,580

5 years

936

78

7,600

5 years

1,360

113.33

9,850

5 years

1,730

144.17

8,600

3 years

2,433.34

202.78

11,970

5 years

1,974

164.5

500

5 years

50

4.17

19.

Toilet hand
sprayer

200

3 years

36.67

3.06

20.

Microwave

1,790

3 years

413.35

34.45

238,860

19,905.12

14.

15.

16.

17.

18

Table

Manager Set

Refrigerator
Water Dispenser

Faucet

total

Table 4.4

http://www.hi-tech.asia/wp-content/uploads/2011/09/PWB000141490L2-290x160.jpg

68

http://www.kkt.co.th/shop/k/kktemarket/img-lib/spd_20111217153032_b.jpg
http://c0.dmlimg.com/1fc1c1c2db5852e08ffc380475e26336d202d63a07c0c0dcbc876e4d4d7a0c
db.jpg
http://www.108comstore.com/sites/default/files/imagecache/product_full/FAX-837MCS.jpg
http://www.jkscom.com/images/catalog_images/1304174271.jpg
http://www.goodchoiz.com/content/images/thumbs/0000746__mono_twc_1502_75f_.jpeg
http://www.thehirebusiness.com/images08/e029-mesh-swivel-office-chair.jpg
http://www.beautyandnails.com.au/images/scaled/shopitemzoom1299904157_NailCustomerChair.jpg
http://3.bp.blogspot.com/-4VpazPH2h9k/TwSS3PrASI/AAAAAAAAATY/hOgLvaKXlEM/s1600/cabinet.jpg
http://www.officesuppliesb2b.com/b2b/pics/Lever_Arch_File__PVC_Cover__Document_File.jpg
http://www.royaalinteriorfurniture.com/image/1250228809200905151127230.ConferenceTable-%20Chairs.jpg
http://cozyfurnitures.com/wp-content/uploads/2013/01/Minimalist-furniture-comfortable-sofaciones-blog.jpg
http://www.gd-wholesale.com/userimg/21/3674i2/wall-split-type-air-conditioner-j-series-418.jpg
http://www.yopi.co.th/image/prod_pics/1963/e/1963052.jpg
http://www.scandinaviancomfort.com/tv/tv12.jpg
http://media.treehugger.com/assets/images/2011/10/buygreen-bravespace-hollow-diningtable.jpg
http://media.yellowpages.co.th/yellowpages/products/th/2045712/9934048_006.jpg
http://www.in.all.biz/img/in/catalog/104797.jpeg
http://www.ilovemyshopping.com/th/upload/1334801887_01.jpg
http://adams50.realelibrary.com/_adams50/public_gallery/dinner-table.jpg
http://2.bp.blogspot.com/_IhbHlbFiggY/SaO4dPIxgI/AAAAAAAAACg/z9xLNi0J52w/s1600/refrigerator.jpg
69

http://www.abcsources.com/images/120610/china-wholesale-Stainless-Steel-Vacuum-Flask7443.jpeg
http://www.o-digital.com/uploads/2227/2291-1/Water_Dispenser_HSM_58LB_729.jpg
http://www.siam-shop.com/images/shop/1561
http://www.be2hand.com/upload/200911/200911-03-210719-3.jpg
http://www.clipmass.com/upload/news/13/12248_full.jpg
http://www.swanstreet.com.au/_uploaditems/_uploadimages/stock/lrg_1996_1_Basin%20Myra.j
pg
http://www.fpo.go.th/S-I/Source/ECO/ECO23.htm

70

Chapter 5: Production and Operations Analysis


5.1 Product characteristics

Real estate industry

Figure 5.1
http://trangcity.olxthailand.com/iid-55860376

Real estate property consisting of land and buildings. The property was built mainly in
the form of a real estate purchase or rent with land, buildings or homes. Successful Real Estate
Business Assoc Assoc.Witthawat Rungreangpon Real estate professionals said movable
component to business success, we need the three important aspects of the Land & Location,
Product or Project and Target Market.
Land & Location property is not moving each plot of land has its own characteristics, so
the decision to buy the land that very important to do business.
Product or Project, we should define the types of projects that can be done on the kind of
land such as a house or townhouse or a mix of detached houses and townhouses etc. We should
make a difference by making a decision on a product from competitors by understanding the
competition, Understand the needs of our customers and understand the potential to help the
company to develop projects that are different from competitors in the market and make the
project is unique.
Target Market is a target of the project was to be decided on its products and in the
development of the project. If you understand the needs of each customer group to help develop
the product in terms of size, number of rooms, designed to meet the needs of the projects to
achieved quickly. We should to understand the way of life (Life Style) associated with the
client's goals and living in the central district.
71

Business Plan Real estate, we will build it in the shape of a house called The Modern
empire village it is a perfect mix contemporary, modern empire design with simple and Thaistyle elements, so you can being life with better community. The villa will locate. In Amphor
Chiangkong, Chiangrai area about 34 Rai for establishes. As an around there will be natural
environment very good view. It's appropriate for every one love peaceful, workout, party ETC.
Our place far away from downtown 100 KM, but this is easiest. Ways to connect with another
country such as Lao, China and Myanmar for businessman want to contract any business because
they are going open AEC in the next 2 year. Our villa is a good choice for someone looking for''
Modern villa''.

We separate home that in 3 satisfactions.


Type A is Neo modern style. There are 200 SQM 3 bed rooms, 3 bath rooms, 1 parking.

J
,

Figure 5.2
We set 3 bedrooms, 3 bathrooms, parking a car. This is a comfortable home, closed to
nature and Emphasis on energy efficiency. About veranda have seating it Continuation of the car
park. It does can be bedrooms. In the living room has a glass window; Big Bay Window corner.
Dining room and kitchen room have to separate for cooking and washing. Upstairs is divided
into two medium-sized bedrooms and another room, a bedroom for privacy, because it has a
bathroom and dressing room. Veranda have big Bay Window and awning on the back bedroom
we can put an air compressor is placed. Roof on the top is Sky Light. Size of the house width
8.80 m 11.00 m depth
Downstairs:
- Large entrance. Next to the car park (Size 2.00 x 3.50 m).- A large living room (size 3.70 x
4.70 m).- Dining room (Size 3.20 x 3.50 m).- Kitchen (size 2.50 x 3.00 m).- The Pantry Food
Preparation (Size 1.30 x 3.00 m).- Toilet (Size 1.60 x 2.00 m).- Storage room under the stairs
72

(Size 1.00 x 2.00 m).- Yard washing and drying clothes (size 1.50 x 3.20 m).-Parking spaces
with a storage room (size 3.00 x 5.50 m)
Upstairs:
- Private bedroom, the dressing. Porch (Size 4.20 x 6.20 m) - Bedroom 2 (Size 3.00 x 3.20 m).Bedroom 3 (size 3.00 x 3.00 m).- Bathrooms for the bedrooms upstairs (Size 1.80 x 2.00 m).Porch of Bedroom 1 (size 1.20 x 6.00 m) is used as a place to air compressors.
- Canvas on back bedroom 2 and bedroom 3 (size 0.90 x 4.50 m) is used as a place to air
compressors.

Type B is Modern resort. There are 240 SQM 3 bed rooms, 3 bath rooms, 1houskeeping
room, 2 parking.

Figure 5.3
There are 240 SQM 3 bed rooms, 3 bath rooms, 1housekeeping room, 2 parking .The
area inside and outside are continue smoothly. The slantingly in front its closed to near garage.
In the living room have big windows and Continuing to the Kitchen. You can put counter bar
here. Bedroom for your parent and it can be to office, living room for watching TV. About back
it for laundry. It has a big bed room, dress room and bath room for your privacy. Porch in the
font and 2 another bedroom that have porch in large size you can place asset of chairs. Size of
the house width 9.10 m Depth 11.10 m
Ground floor
- The entrance corridor (Size 1.80 x 3.50 m) - Airy living room (size 3.00 x 3.50 m).- Dining
room (Size 3.00 x 3.50 m).- Kitchen (size 2.00 x 3.20 m).- The food preparation (size 2.20 x 2.30
m).- Bedroom 3 for seniors (Size 3.00 x 3.20 m) ** can be home theater room or office.- Toilet
73

(Size 1.40 x 2.20 m).- Storage room under the stairs (Size 1.00 x 2.00 m).- Laundry (Size 1.40 x
3.40 m).housekeeping room(Size )
Second floor
- Bedroom with the dressing and a private bathroom (size 3.50 x 6.50m).- Bedroom 2 (Size 3.00
x 3.20 m).- Bedroom 3 (size 3.00 x 3.20 m).- Hall (Size 2.00 x 2.50 m).- Bathroom for bedroom
1 (size 1.80 x 2.10 m).- 2 bathroom for bedroom 2 and bedroom 3 (size 2.00 x 2.10 m).
Type C is Modern exclusive. There are 302 SQM 4 bed room, 5 bath rooms, 1 housekeeping
room, 2 parking.

Figure 5.4
There are 302 SQM 4 bed room, 5 bath rooms, 1 housekeeping room, 2 parking. The area
inside and outside are continue smoothly. The slantingly in front its closed to near garage. In the
living room have big windows and Continuing to the Kitchen. You can put counter bar here.
Bedroom for your parent and it can be to office, living room for watching TV. About back it for
laundry. It has a big bed room, dress room and bath room for your privacy. Porch in the font and
2 another bedroom that have porch in large size you can place asset of chairs. Size of the house
width 9.10 m Depth 11.10 m

Ground floor
- The entrance corridor (Size 1.80 x 3.50 m) - Airy living room (size 3.00 x 3.50 m).- Dining
room (Size 3.00 x 3.50 m).- Kitchen (size 2.00 x 3.20 m).- The food preparation (size 2.20 x 2.30
m).- Bedroom 3 for seniors (Size 3.00 x 3.20 m) ** can be home theater room or office.- Toilet
(Size 1.40 x 2.20 m).- Storage room under the stairs (Size 1.00 x 2.00 m).- Laundry (Size 1.40 x
3.40 m).housekeeping room(Size ) .- Bathroom(Size )

74

Second floor
- Bedroom with the dressing and a private bathroom (size 3.50 x 6.50m).- Bedroom 2 (Size 3.00
x 3.20 m).- Bedroom 3 (size 3.00 x 3.20 m).- Hall (Size 2.00 x 2.50 m).- Bathroom for bedroom
1 (size 1.80 x 2.10 m).- 2 bathroom for bedroom 2 and bedroom 3 (size 2.00 x 2.10 m).
5.2 Specification, Feathers, Dimension, Life Time, etc.
There are three style of home in village each style we must be able to the customers satisfy and
comfortable as well. Our village is call The Modern empire village is a perfect mix
contemporary, modern empire design with simple and Thai-style elements, so you can being life
with better community. So, we are separate the home in three satisfaction. Type A: There are
200 SQM 3 bed rooms, 3 bath rooms, 1 parking and the price is 2.15million baht. Type B:
There are 240 SQM 3 bed rooms, 3 bath rooms, 1houskeeping room, 2 parking and the price is
2.75 million Baht. Type C. There are 302 SQM 4 bed room, 5 bath rooms, 1 housekeeping
room, 2 parking and the price is 3.05 million baht. All facilities in the village are Fitness,
Swimming pool, Playground Island, Garden, and Guardhouse for the comfortable of customers.

75

5.3 Product/Service Process

Promote village

Contract the construction


Buy the land the appreciate for village

Product/Service
Process

Construction complete, open for customer


who reserve the home.

Bring the document to the


construction company for the design of
home

76

Contract the credit of the bank for


requests to recover

5.4 Operating Cost

No

List

Number

Unit

Raw material cost


Cost/unit

Cost/unit

Raw material anddirect


labor cost

Total cost

Stake
- Stakes 0.22x0.22x6 .

76

Unit

- Stakes

76

Unit

5,000

380,000

380,000
80

6,080

Excavation of the soil


- Ground work

Total cost

Direct labor cost

6,080
-

577

Cubic meters

63

36,351

36,351

- Concrete 1:3:5

17

Cubic meters

1,766

30,022

86

1,462

31,484

- Sand

33

Cubic meters

262

8,635

- Concrete of structure 320 ksc.

133

Cubic meters

1,935

257,391

340

45,220

302,611

- Steel DB 20 mm.

4,651

Kg

21

96,043

30

1,462

97,505

- Steel DB 16 mm.

3,119

Kg

21

64,345

30

93,570

157,915

35

Kg

29

998

4,033

457,434

Structure
3.1 Ground work

- Wire
Total

77

8,635

998
461,467

141,714

599,148

Note

No

List

Number

Unit

Raw material cost

Direct labor cost

Cost/unit Total cost

Cost/unit

Total cost

Total of table (3.1)


- Wood

Cubic feet

Box

72

Cubic
meters

- Steel DB 16 mm.

14,202

Kg

- Steel RB 6 mm.

1,396

Kg

- Wire

234

Kg

- Wood

570

Cubic feet

- Nail

14

box

308.41

77,411

105

542.06 2,168

3.2 Pole

- Steel DB 16 mm.

Cubic
meters

18,873

Kg

2,168

340

24,480

163,819

21 292,987

30

426,060

719,047

28

39,088

69,311

21.65 30,223
29 6,671
308.41

175,794

105

542.06 7,589

59,850
-

235

103,766

1,935 139,339

3.3 Beam
- Concrete of structure 320 ksc.

26,355
-

- Concrete of structure 320 ksc.

Note

599,148
251

- Nail

Raw material
anddirect labor cost

6,671
235,644
7,589

1,935 454,788

340

79,900

534,688

21 389,350

30

566,190

955,540

Total

3,397,393

78

No

List

Number

Unit

Raw material cost


Cost/Unit Total cost

Direct labor cost


Cost/Unit

Total cost

Total of table (3.3)

Raw material cost and


direct labor cost
3,397,393.00

- Steel DB 12 mm.

31,700

Kg.

19

602,300

30

951,000

1,553,300

- Steel RB 6 mm.

9,296

Kg.

21.65

201,258

28

260,288

461,546

- Wire

1,424

Kg.

29

40,598

- Wood

732

Cubic feet.

308.41

225,756

- Nail

18

Box

542.06

9,757

3.4 Floor
- Concrete of structure 320
ksc.
- Steel RB 9 mm.

105

76,860

40,598
302,616
9,757

556.4

Cubic
meters

1,935

1,076,784

340

189,176

1,265,960

4,344

Kg.

21.14

91,832

28

121,632

213,464

- Wire

66

Kg.

29

1,882

- Wood

2,226

Cubic feet.

308.41

686,397

17

Kg.

542.06

9,215

- Nail

Total

105

233,688

1,882
920,085
9,215

8,175,817.20

79

Note

5.5 Facility Management


Facilities are critical to our business because facilities that will enhance the comfort
and convenience to our customers, when we provide all good facilities and good quality to
customers, it will be created satisfaction and help decide the best one for customers who are
looking for a quality home too. The facility that we prepare for our village, there is preparing
electricity and water that is very important to do everything, Telephone for communicates
and CCTV cameras

Figure 5.5
Water
We are using the water from Provincial Water works Authority (Chiang Rai province)
this water has safety and the monitoring of water quality regularly and for payment we can
pay cost of utilities by go to pay be yourself at provincial waterworks Authority for pay by
agent for the waterworks Authority.

Figure 5.6
Electricity
We are using the electricity in the form of Specific Business Service its compound
with a maximum 15-minute integrated demand of 30 kilowatt and over, through a single
Watt-hour demand meter. For payment we can pay cost of utilities by deducted money from
the bank and pay at counter service and pay at past.

80

Figure 5.7
Telephone
We are using telephone line with TOT operation for communication between
individuals.
For payment you can pay bill by counter service.

Figure 5.8
TOT router wireless
We are using TOT router wireless for sharing the internet for every people can
connecting, use for daily life and entertainment that we are provide convenience to customer.

Figure 5.9
CCTV cameras
81

We are using CCTV for security of the people in the village. We will receive reliable
form customers.

82

Chapter 6: Administration cost


6.1 Management Analysis
6.1.1 Organization management
Modern Empire village is a real estate business; our project has to manage the
organization by register Modern Empire village project to company limited. We have been
formed to communicate with register partnership firm department. This is located office in
Chiang Khong district Chiang Rai province. The type of organization is company limited,
which set up with a capital by divided into equal share, the liability of shareholders being
limited to the amount unpaid on the share severally held by them. We submit the names
company is Modern Empire village for determine not same as the name reserved other
companies.
The name of partnership in Modern Empire village company as follows;
1. Miss Saowapa srikrairot
2. Miss Kanokwan bunkhet
3. Miss Thanisa kiddee
4. Mr. Poom kosolsirisukkul
5. Miss Nicharin kheunsakul
6. Mr. Olanrat upalavong
7. Mr. Sittikorn sroimori
8. Miss Sawaros kimsee
After we are form to the company limited, the eight of partnership have a right to vote
and make agreement to appoint Mr. Olanrat upalavong to be managing project manager of
Modern Empire Village Company limited. He has responsible to register establish company
limited at Chiang Khong district Chiang Rai province. Then the responsible to construction
management about project planning, purchasing plan, operation plan and financial plan by
control with quality and also have a duty to coordinate with other institute both inside and
outside the company.

83

6.1.2Organization Chart

Project Manager
(1 person)

Accounting

Sale &
Marketing

Accountant

Sale Staff

(2 person)

(4 person)

Human
Resource

HR staff (1
person)

Legal

General

Law sraff

Housekeeper

(2 person)

(3 person)

Figure6.1

Consttruction

Security Guard
(4 person)

Technician

(3 person)

(2 person)

Modern Empire Company limited has number of employee 24 persons. The detail below is
described type and a job description in each position.
1. Managing project position (1 person)
Details;
-construction management by provide quality and timely completion-planning, financial plan,
purchasing plan, operation check, and construction development
-coordinate with other institute both inside and outside the organization
-Procurement and employ contractor -develop project until it is complete with quality and
delivery to customer
Characteristic;
-Bachelors degree/Masters degree; civil engineering or other related major.-Work

-Strong leadership

84

(2 person)

Gardener

6.1.3Personnel in the Organization

experience at least five to ten years, administrative and coordinator

Engineer

-Have skill to use computer and communicate well with English language
2. Construction department; engineering (2 persons)
Details;
-coordinate with other institute both inside and outside the organization
-prepare documents including contract and document for use in building
-construction management
-documentation; process of work and weekly report
Characteristic;
-Bachelors degree/Masters degree; civil engineering or other related major
-Work experience one to three years
-Strong leadership
-Have skill to use computer
3. Construction department; Technicians (2 persons)
Details;
-Control, monitor and repair the system follow the project responsibility
Characteristic;
-vocational certificate or over; electricity and electronics major
-work experience at least two years in building maintenance
-have skill in leadership and communicate
-love service
4. Sale & marketing department; Sale staff (1 person)
Details;
-Responsible for project selling and customer service to accomplish the goals
85

Characteristic;
-Bachelors degree or over
-Work experience at least two years about real estate
-Have skill in coordination and bargaining
-Ability to use a computer
5. Sale & marketing department; Customer service and relation (1 person)
Details;
-operation in the customer service-support sales; sinning contract, installment and copy-right
Characteristic;
-Bachelors degree or over
-Work experience at least one year about customer service
-Be creative
-Have able to work under pressure and resourcefulness to solve facing problem
-Have skill in coordination and bargain
-Can use computer MS office program
-Have skill in English language
6. Sale & marketing department; Marketing staff (1 person)
Details;
-administrate of marketing about real estate
-marketing plan, advertising, public relation and promotion
-ability to help coordinate job both inside and outside organization
-design brochure-survey and conclude the demand of market
-analyze and problem solving of market-conclude of sale monthly promotion
86

Characteristic;
-Bachelors degree; marketing, business administration
-Work experience about marketing at least two years-Be creative, good human relation and
good coordination
-Have skill in English language
-Ability to use computer
7. Sale & marketing department; purchasing staff (1 person)
Details;
-Responsible for contact the seller and contractor and then compare price
-Making a purchase order
-Order material according to the company order
Characteristic;
-Male/female-High vocational certificate/ Bachelors degree or over
-Work experience about purchasing at least one year
-Ability to use a computer; Microsoft office excel
-Have well bargaining skill and resourcefulness
-Working carefully
8. Accounting Department; accountant (2 persons)
Details;
-Administrate of document
-Administrate of expense and expenditure
-Distribution of receipts-Distribution of tax invoice and invoice
-Collect the rent and financial responsibility

87

Characteristic;
-High vocational certificate or over
-Work experience at least one year
-Ability to use computer
9. Human resources department; Human resource staff (1 person)
Details;
-Responsible for recruitment
-analyst, suggestion and solving the problem in order to work effectively
Characteristic;
-Bachelors degree or over, human resource management major
-Work experience at least two years
-Have knowledge of labor legislations-Have a skill to coordination and problem-solving
-Have skill to use computer and communicate well with English language
-Love service
10. Legal department; Law staff (2 persons)
Details;
-Make a contract, audit contract and terms including check and amend legal document
-Responsible for preparation of standard contract about land development project and other
related document
-Supervise the work practices of Register Company; business registration, tax and other
related work
Characteristic;
-Bachelor of laws/ Master of laws-Work experience at least five years about audit contract,
draft agreement that related to real estate
88

-Have a basic knowledge of real estate development business, tax and labor legislation
-Leadership skill and coordination
11. General management department; Housekeeper (3 persons)
Details;
-Responsible for cleaning the office
Characteristic;
High school education or over Female; age 25-50 years old Attentiveness working Endure,
diligent, high of responsibility and honest
12. General management department; Security guard (4 persons)
Details;
-responsible for security
Characteristic;
-Vocational certificate
-male; age 25-50 years old
-leadership skill
-Ability drives a car and has a license
13. General management department; Gardener (3 persons)
Details;
-water and garden
-weed
Characteristic;
-Vocational certificate-male; 20 50 years old
-Be honest

89

6.2 Administration Cost


1. Employee Salary / Wage rate of our organization
No

Position

Project Manager

Rank

Salary (Baht)

1 person

30,000

2 persons

(9,5002) 19,000

Accounting Department
2

Accountant

Sale and Marketing


3

Sale Staff

1 person

8,500

Customer services and

1person

8,500

relationship
5

Marketing Staff

1 person

8,500

Purchasing Staff

1 person

8,500

Human Resources Staff

1 person

8,500

Law Staff

2 persons

(9,5002) 19,000

Human Resources
7

Legal
8

General
9

Housekeeper

3 persons

(6,0003) 18,000

10

Security Guard

4 persons

(7,0004) 28,000

11

Gardener

3 persons

(7,0003) 21,000

12

Estimate Engineer/Foreman

2 persons

(15,0002)30,000

2 persons

(15,0002)30,000

BOQ
13

Technician

90

Total salary expense/month

237,500

Table6.1
2. Stationary Expense
Modern Empire village will separate the office equipment expense according to each
quarter of the year. For the first quarter of every year, the office equipment list and expense is
as below;
Price
No

Item

Unit

per
unit

A4 Paper

Fax paper

3pack

Total
(baht)

529

1,587

5 pieces

47

235

Clip paper

3 box

40

120

Staples pin

73

146

Pen

30 pieces

180

Pencil

1 box

30

30

19

57

65

195

63

315

48

240

95

95

93

186

5(1pack/12piece)

149

745

7
8
9

Eraser
pencil
Eraser pen
Bill
Sprit(Cash)

10

Glue stick

11

Glue tape

12

13

Ink for
stamp pad
Document
case

(1pack/2500paper)

1 pack (1pack/9
pieces)

14

Scissor

48

144

15

Cutter

43

129

16

Stamp ink

75

225

91

pad
17

Stamp set

499

499

18

Calculator

345

1,035

19

Staples

38

190

Total stationary expense

6,365

Table6.2
For the second, third and fourth quarter of every year, the office equipment expense will
be as below;
No

Item

Unit

Price

Total

per

(baht)

unit
1

A4 Paper

Fax paper

3pack

529

1,587

5 pieces

47

235

Clip paper

3 box

40

120

Staples pin

73

146

Pen

30 pieces

180

Pencil

1 box

30

30

19

57

65

195

63

315

48

240

95

95

93

186

7
8
9

(1pack/2500paper)

Eraser
pencil
Eraser pen
Bill
Sprit(Cash)

10

Glue stick

11

Glue tape

12

1 pack (1pack/9
pieces)

Ink for
stamp pad

Total stationary expense


(Source: http://www.officemate.co.th/)
Table 6.3

92

3,386

3. Facility cost
3.1Rate of Electricity expense

Figure6.2
Electricity Expense/month
Estimate use of electricity

1000 unit

Add services expense


Total Electricity expense / month
*Not include in tax
(Source: http://www.eppo.go.th/power/pw-Rate-PEA.html#2
3.2Rate of water expense

93

2,464.90 baht
228.17 baht
2,693.07 baht

Figure6.3
Water expense/mount
Estimate use of water

100 unit

1,945 baht

*Not include in tax


Remark: For Type 1: Residential Category, in case that the volume of water usage in any
month is more than 100 cu.m the water bill of that month will be charged by using the tariff
category of Type 2: Government/Small Business. (January 2013)
(Source: http://www.pwa.co.th/service/tariff_rate_en.html)

3.3 Telephone & Internet Expense

94

Figure6.4
Estimate telephone expense per month
Monthly fee

200baht/month

Call paid

1,500 baht/month

Total telephone expense per month

1,700 baht/month

*Not include in tax

Estimate Internet Expense


590/month
*Not include in tax

Figure6.4

6.3 Estimate Administration Cost

Year 2013
95

Year2013
No.

Description

Base

Jan

Feb

Mar

Apr

May

Jun

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

6,353

3,386

2,693.07

2,393.07

2,493.00

2,533.78

2,693.87

2,693.50

2,693.75

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

2,198.75

2,007.50

1,999.90

1,987.05

1,790.85

1,965.33

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 248,409.82 243,945.5 243,978.68 247,781.92 243,929.35 244,104.08

Table6.4

Year2013
No.

Description

Base

Jul

Aug

Sep

Oct

Nov

Dec

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

3,386

3,386

2,693.07

2,599.88

2,493.07

2,533.07

2,693.07

2,553.78

2,475.91

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

1,990

1,855.09

1,890.77

1,684.03

1,755.80

2,011.60

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 247,420.88 243,793.16 243,868.84 247,208.1 243,754.58 243,932.51

Table6.5

Year 2014

96

Year2014
No.

Description

Base

Jan

Feb

Mar

Apr

May

Jun

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

6,353

3,386

2,693.07

2,393.07

2,493.00

2,533.78

2,693.87

2,693.50

2,693.75

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

2,198.75

2,007.50

1,999.90

1,987.05

1,790.85

1,965.33

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 248,409.82 243,945.5 243,978.68 247,511.92 243,929.35 244,104.08

Table6.6

Year2014
No.

Description

Base

Jul

Aug

Sep

Oct

Nov

Dec

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

3,386

3,386

2,693.07

2,599.88

2,493.07

2,533.07

2,693.07

2,553.78

2,475.91

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

1,990

1,855.09

1,890.77

1,684.03

1,755.80

2,011.60

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 247,420.88 243,793.16 243,868.84 247,208.1 243,754.58 243,932.51

Table6.7

97

Year 2015
Year2015
No.

Description

Base

Jan

Feb

Mar

Apr

May

Jun

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

6,353

3,386

2,693.07

2,393.07

2,493.00

2,533.78

2,693.87

2,693.50

2,693.75

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

2,198.75

2,007.50

1,999.90

1,987.05

1,790.85

1,965.33

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 248,409.82 243,945.5 243,978.68 247,511.92 243,929.35 244,104.08

Table6.8

Year2015
No.

Description

Base

Jul

Aug

Sep

Oct

Nov

Dec

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

3,386

3,386

2,693.07

2,599.88

2,493.07

2,533.07

2,693.07

2,553.78

2,475.91

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

1,990

1,855.09

1,890.77

1,684.03

1,755.80

2,011.60

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 247,420.88 243,793.16 243,868.84 247,208.1 243,754.58 243,932.51

Table6.9

Year 2016
98

Year2016
No.

Description

Base

Jan

Feb

Mar

Apr

May

Jun

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

6,353

3,386

2,693.07

2,393.07

2,493.00

2,533.78

2,693.87

2,693.50

2,693.75

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

2,198.75

2,007.50

1,999.90

1,987.05

1,790.85

1,965.33

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 248,409.82 243,945.5 243,978.68 247,511.92 243,929.35 244,104.08

Year2016
No.

Description

Base

Jul

Aug

Sep

Oct

Nov

Dec

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

3,386

3,386

2,693.07

2,599.88

2,493.07

2,533.07

2,693.07

2,553.78

2,475.91

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

1,990

1,855.09

1,890.77

1,684.03

1,755.80

2,011.60

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 247,420.88 243,793.16 243,868.84 247,208.1 243,754.58 243,932.51

Table6.10
Year 2017
Year2017
No.

Description

Base

Jan

Feb

Mar

Apr

May

Jun

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

99

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense

6,353

6,353

3,386

2,693.07

2,393.07

2,493.00

2,533.78

2,693.87

2,693.50

2,693.75

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

2,198.75

2,007.50

1,999.90

1,987.05

1,790.85

1,965.33

Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 248,409.82 243,945.5 243,978.68 247,511.92 243,929.35 244,104.08

Year2017
No.

Description

Base

Jul

Aug

Sep

Oct

Nov

Dec

Employee salary

237,500

237,500

237,500

237,500

237,500

237,500

237,500

6,353

3,386

3,386

2,693.07

2,599.88

2,493.07

2,533.07

2,693.07

2,553.78

2,475.91

1,945

1,945

1,945

1,945

1,945

1,945

1,945

2,290

1,990

1,855.09

1,890.77

1,684.03

1,755.80

2,011.60

2
3
4

Stationary
Expense
Electricity
Expense
Water Expense
Internet&

Telephone
Expense
Total estimate

administration cost

250,781.07 247,420.88 243,793.16 243,868.84 247,208.1 243,754.58 243,932.51

Table6.11
6.4 Conclusion
Modern Empire village is a real estate business; our project has to manage the
organization by register Modern Empire village project to company limited. We have
estimate and calculate the administration cost are include employee salary, stationary expense
and facility cost are include rate of electricity expense, rate of water expense, telephone &
internet expense. We have to do the organization chat in order to set people who have
qualifications that appropriate with each position to work and develop the organization. We
will select and recruit employees by their characteristic and qualifications and set them in
the position, task and responsibility of employees.
100

Chapter 7 Financial

101

Income Statement
2013
Year

10

11

12

Total

Sales
DownpaymentstyleA

215,000.00

215,000.00

215,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

215,000.00
-

DownpaymentstyleC

305,000.00

InterestrateA

InterestrateB

215,000.00

215,000.00

275,000.00

275,000.00

64,500.00

64,500.00

82,500.00

82,500.00

InterestrateC

Cost A

2,150,000.00

2,150,000.00

2,150,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

Net sales

8,745,000.00

5,390,000.00

5,390,000.00

2,150,000.00

2,150,000.00

2,150,000.00

2,750,000.00

2,750,000.00

2,365,000.00

5,537,000.00

5,537,000.00

215,000.00
-

1,505,000.00
1,375,000.00

305,000.00

610,000.00

64,500.00

193,500.00

165,000.00

91,500.00

91,500.00

2,150,000.00

15,050,000.00

13,750,000.00

3,050,000.00

6,100,000.00

5,876,000.00

38,840,000.00

Cost of good sold


All Construction A

1,750,000.00

1,750,000.00

1,050,000.00

700,000.00

1,400,000.00

1,750,000.00

1,050,000.00

350,000.00

350,000.00

700,000.00

10,850,000.00

All Construction B

2,500,000.00

2,500,000.00

1,500,000.00

1,000,000.00

2,000,000.00

2,500,000.00

1,500,000.00

500,000.00

500,000.00

1,000,000.00

15,500,000.00

All Construction C

3,500,000.00

3,500,000.00

2,100,000.00

1,400,000.00

2,800,000.00

3,500,000.00

2,100,000.00

700,000.00

700,000.00

1,400,000.00

21,700,000.00

Total Cost of good sold

7,750,000.00

7,750,000.00

4,650,000.00

3,100,000.00

6,200,000.00

7,750,000.00

4,650,000.00

1,550,000.00

1,550,000.00

3,100,000.00

48,050,000.00

Grossmargin

2,360,000.00 -

2,360,000.00 -

4,650,000.00 -

3,100,000.00 -

6,200,000.00 -

7,750,000.00 -

2,285,000.00

3,987,000.00

3,987,000.00

2,776,000.00 -

6,000.00

6,000.00

6,000.00

8,745,000.00 -

9,210,000.00

Operatating Expense
Marketing expense
Radio

6,000.00

Baanlaesuan Fair
Brochure
TotalMarketingexpense

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

50,000.00

5,900.00

72,000.00
50,000.00
5,900.00

61,900.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

127,900.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

2,850,000.00

Administration expense
EmployeeSalary
Officesupply

2,000.00

Utilityexpense

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

36,000.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

2,890,000.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

324,305.12

8,478,594.88 -

2,626,405.12 -

2,626,405.12 -

4,918,405.12 -

3,366,405.12 -

6,466,405.12 -

8,016,405.12 -

2,553,405.12

3,720,594.88

3,720,594.88

1,116,178.46

1,116,178.46

324,305.12

2,604,416.42

2,604,416.42

TotalAdministrationexpense
Depreciation
EBIT
Income Tax(30%)
Net Income Loss

Beginning Retain Earnings

Dividend (10%)

Retain earnings

324,305.12

2,543,578.46
5,935,016.42 -

324,305.12

1,009,921.54

2,626,405.12 -

2,626,405.12 -

4,918,405.12 -

2,356,483.58 -

6,466,405.12 -

8,016,405.12 -

5,017,209.65

2,390,804.53 -

235,600.59 -

5,154,005.71 -

7,274,840.93 -

13,741,246.05 -

593,501.64
5,017,209.65

2,390,804.53 -

235,600.59 -

5,154,005.71 -

235,648.36
7,274,840.93 -

102

13,741,246.05 -

21,757,651.17 -

2,000.00

2,553,405.12
21,757,651.17 24,311,056.29 -

24,311,056.29 -

21,967,081.52 -

260,441.64

260,441.64

21,967,081.52 -

19,362,665.10 -

2,509,594.88 -

4,000.00

238,861.44
12,466,761.44
3,766,013.86

2,509,594.88 -

16,234,775.30

19,362,665.10 -

16,853,070.22

16,853,070.22 -

878,736.57
33,966,582.08

2014
Year

10

11

12

Total

Sales
DownpaymentstyleA

430,000.00

215,000.00

215,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

DownpaymentstyleC

305,000.00

305,000.00

InterestrateA

258,000.00

129,000.00

129,000.00

InterestrateB

165,000.00

165,000.00

165,000.00

InterestrateC

183,000.00

183,000.00

Cost A

4,300,000.00

2,150,000.00

2,150,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

3,050,000.00

11,716,000.00

9,222,000.00

5,684,000.00

All Construction A

350,000.00

350,000.00

1,050,000.00

700,000.00

700,000.00

350,000.00

350,000.00

3,850,000.00

All Construction B

500,000.00

500,000.00

1,500,000.00

1,000,000.00

1,000,000.00

500,000.00

500,000.00

5,500,000.00

All Construction C

700,000.00

700,000.00

2,100,000.00

1,400,000.00

1,400,000.00

700,000.00

700,000.00

7,700,000.00

1,550,000.00

1,550,000.00

4,650,000.00

3,100,000.00

3,100,000.00

1,550,000.00

1,550,000.00

17,050,000.00

10,166,000.00

7,672,000.00

1,034,000.00 -

3,100,000.00 -

1,550,000.00 -

1,550,000.00

6,000.00

6,000.00

Net sales

215,000.00

129,000.00

2,150,000.00

2,494,000.00

215,000.00

129,000.00

2,150,000.00

2,494,000.00

215,000.00

215,000.00

430,000.00

2,150,000.00

275,000.00

275,000.00

275,000.00

1,650,000.00

305,000.00

305,000.00

1,220,000.00

129,000.00

129,000.00

258,000.00

1,290,000.00

165,000.00

165,000.00

165,000.00

990,000.00

183,000.00

183,000.00

732,000.00

2,150,000.00

2,150,000.00

4,300,000.00

21,500,000.00

2,750,000.00

2,750,000.00

2,750,000.00

16,500,000.00

3,050,000.00

3,050,000.00

12,200,000.00

9,222,000.00

11,716,000.00

58,232,000.00

5,684,000.00

Cost of good sold

Total
Gross margin

606,000.00 -

2,494,000.00

5,684,000.00

9,222,000.00

11,716,000.00

41,182,000.00

6,000.00

6,000.00

6,000.00

6,000.00

72,000.00

Operatating Expense
Marketing expense
Radio
Baanlaesuan Fair
Brochure
Total Marketing expense

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

50,000.00

5,900.00

50,000.00
5,900.00

61,900.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

127,900.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

2,850,000.00

Administration expense
EmployeeSalary
Officesupply

2,000.00

Utilityexpense

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

36,000.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

2,892,000.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

EBIT

9,841,694.88

7,405,594.88

3,368,405.12 -

1,816,405.12 -

1,816,405.12 -

266,405.12

2,225,594.88

5,417,594.88

8,955,594.88

11,449,594.88

37,923,238.56

Income Tax(30%)

2,952,508.46

2,221,678.46

Net Income Loss

6,889,186.42

5,183,916.42

TotalAdministrationexpense
Depreciation

Beginning Retain Earnings

Dividend (10%)
Retain earnings

16,853,070.22 -

10,652,802.45 -

688,918.64

518,391.64

10,652,802.45 -

5,987,277.67 -

767,594.88 -

872,405.12 -

2,000.00

6,000.00

79,921.54

667,678.46

1,625,278.46

2,686,678.46

3,434,878.46

13,508,779.25

1,816,405.12 -

1,816,405.12 -

186,483.58

1,557,916.42

3,792,316.42

6,268,916.42

8,014,716.42

24,414,459.31

5,987,277.67 -

5,219,682.79 -

6,092,087.91 -

9,460,493.03 -

11,276,898.15 -

13,093,303.27 -

2,803,904.17

4,409,340.60

5,219,682.79 -

6,092,087.91 -

9,460,493.03 -

11,276,898.15 -

103

3,368,405.12 -

872,405.12 -

767,594.88 -

13,093,303.27 -

18,648.36
13,261,138.50 -

13,261,138.50 -

11,859,013.72 -

8,445,928.95 -

155,791.64

379,231.64

626,891.64

801,471.64

3,152,048.49

11,859,013.72 -

8,445,928.95 -

2,803,904.17

4,409,340.60

25,671,751.42

2015
Year

10

11

12

Total

Sales
DownpaymentstyleA

430,000.00

215,000.00

430,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

DownpaymentstyleC

305,000.00

305,000.00

305,000.00

InterestrateA

387,000.00

193,000.00

387,000.00

InterestrateB

247,500.00

247,500.00

247,500.00

InterestrateC

274,500.00

274,500.00

274,500.00

Cost A

4,300,000.00

2,150,000.00

4,300,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

12,019,000.00

9,460,000.00

12,019,000.00

Net sales

275,000.00

247,500.00

2,750,000.00
3,272,500.00

215,000.00

430,000.00

215,000.00

645,000.00

430,000.00

3,010,000.00

275,000.00

275,000.00

275,000.00

275,000.00

2,200,000.00

305,000.00

305,000.00

1,830,000.00

387,000.00

193,000.00

580,500.00

387,000.00

2,707,500.00

247,500.00

247,500.00

247,500.00

247,500.00

1,980,000.00

274,500.00

274,500.00

1,647,000.00

3,050,000.00

3,629,500.00

193,000.00

2,150,000.00

2,558,000.00

305,000.00

274,500.00

4,300,000.00

2,150,000.00

6,450,000.00

4,300,000.00

30,100,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

22,000,000.00

3,050,000.00

3,050,000.00

18,300,000.00

14,577,500.00

12,019,000.00

83,774,500.00

8,389,500.00

5,830,500.00

Cost of good sold


All Construction A

All Construction B

All Construction C

Total

Grossmargin

12,019,000.00

9,460,000.00

12,019,000.00

3,272,500.00

2,558,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

3,629,500.00

8,389,500.00

5,830,500.00

14,577,500.00

12,019,000.00

83,774,500.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

72,000.00

Operatating Expense
Marketing expense
Radio
Baanlaesuan Fair
Brochure
TotalMarketingexpense

6,000.00

6,000.00

50,000.00

5,900.00

50,000.00
5,900.00

61,900.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

127,900.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

2,850,000.00

Administration expense
EmployeeSalary
Officesupply

2,000.00

Utilityexpense

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

36,000.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

2,892,000.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

11,694,694.88

9,193,594.88

11,752,594.88

3,006,094.88

266,405.12

3,363,094.88

8,121,094.88

5,564,094.88

14,311,094.88

11,752,594.88

80,515,738.56

Income Tax(30%)

3,508,408.46

2,758,078.46

3,525,778.46

901,828.46

686,878.46 -

79,921.54 -

79,921.54

1,008,928.46

2,436,328.46

1,669,228.46

4,293,328.46

3,525,778.46

24,154,721.57

Net Income Loss

8,186,286.42

6,435,516.42

8,226,816.42

2,104,266.42

1,602,716.42 -

186,483.58 -

186,483.58

2,354,166.42

5,684,766.42

3,894,866.42

10,017,766.42

8,226,816.42

56,361,016.99

Beginning Retain Earnings

4,409,340.60

11,776,998.37

17,568,963.15

24,973,097.92

28,141,547.25

27,973,712.02

30,092,461.80

35,208,751.57

38,714,131.34

47,730,121.12

55,134,255.89

Dividend (10%)

818,628.64

643,551.64

822,681.64

210,426.64

18,648.36

235,416.64

568,476.64

389,486.64

1,001,776.64

822,681.64

5,636,101.70

Retain earnings

11,776,998.37

17,568,963.15

24,973,097.92

26,866,937.70

27,973,712.02

30,092,461.80

35,208,751.57

38,714,131.34

47,730,121.12

55,134,255.89

105,859,171.19

TotalAdministrationexpense
Depreciation
EBIT

2,000.00

2,289,594.88 -

26,866,937.70
160,271.64 28,309,382.47

266,405.12 -

28,309,382.47
18,648.36 28,141,547.25

104

2,000.00

6,000.00

2016
Year

10

11

12

Total

Sales
DownpaymentstyleA

430,000.00

645,000.00

215,000.00

430,000.00

215,000.00

430,000.00

645,000.00

430,000.00

3,440,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

550,000.00

2,475,000.00

DownpaymentstyleC

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

2,135,000.00

InterestrateA

516,000.00

774,000.00

258,000.00

516,000.00

258,000.00

516,000.00

774,000.00

516,000.00

4,128,000.00

InterestrateB

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

660,000.00

2,970,000.00

InterestrateC

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

2,562,000.00

Cost A

4,300,000.00

6,450,000.00

2,150,000.00

4,300,000.00

2,150,000.00

4,300,000.00

6,450,000.00

4,300,000.00

34,400,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

5,500,000.00

24,750,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

21,350,000.00

12,322,000.00

14,945,000.00

9,699,000.00

9,699,000.00

12,322,000.00

14,945,000.00

15,677,000.00

98,210,000.00

Net sales

8,601,000.00

Cost of good sold


All Construction A

All Construction B

All Construction C

Total

Grossmargin

12,322,000.00

14,945,000.00

9,699,000.00

8,601,000.00

6,000.00

6,000.00

6,000.00

6,000.00

9,699,000.00

12,322,000.00

14,945,000.00

15,677,000.00

98,210,000.00

6,000.00

6,000.00

6,000.00

6,000.00

72,000.00

Operatating Expense
Marketing expense
Radio
Baanlaesuan Fair
Brochure
TotalMarketingexpense

6,000.00

6,000.00

6,000.00

6,000.00

50,000.00

5,900.00

50,000.00
5,900.00

61,900.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

127,900.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

2,850,000.00

Administration expense
EmployeeSalary
Officesupply

2,000.00

Utilityexpense

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

36,000.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

2,892,000.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

11,997,694.88

14,678,594.88

9,432,594.88

8,334,594.88 -

268,405.12 -

266,405.12

9,430,594.88

12,055,594.88

14,678,594.88

15,410,594.88

94,951,238.56
28,485,371.57

TotalAdministrationexpense
Depreciation
EBIT

266,405.12 -

266,405.12 -

2,000.00

6,000.00

Income Tax(30%)

3,599,308.46

4,403,578.46

2,829,778.46

2,500,378.46 -

80,521.54 -

79,921.54 -

79,921.54 -

79,921.54

2,829,178.46

3,616,678.46

4,403,578.46

4,623,178.46

Net Income Loss

8,398,386.42

10,275,016.42

6,602,816.42

5,834,216.42 -

187,883.58 -

186,483.58 -

186,483.58 -

186,483.58

6,601,416.42

8,438,916.42

10,275,016.42

10,787,416.42

66,465,866.99

55,134,255.89

62,692,803.67

71,940,318.44

82,628,882.31

82,461,047.09

88,402,321.86

95,997,346.64

105,244,861.41

114,953,536.19

Beginning Retain Earnings


Dividend (10%)

839,838.64

1,027,501.64

660,281.64

Retain earnings

62,692,803.67

71,940,318.44

77,882,853.22

77,882,853.22
583,421.64 83,133,647.99

83,133,647.99
18,788.36 82,964,552.76

82,964,552.76
18,648.36 82,796,717.54

105

82,796,717.54
18,648.36 82,628,882.31

18,648.36

660,141.64

843,891.64

1,027,501.64

1,078,741.64

6,646,586.70

82,461,047.09

88,402,321.86

95,997,346.64

105,244,861.41

114,953,536.19

174,772,816.48

2017
Year

10

11

12

Total

Sales
DownpaymentstyleA

645,000.00

430,000.00

430,000.00

430,000.00

215,000.00

645,000.00

430,000.00

860,000.00

4,085,000.00

DownpaymentstyleB

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

2,200,000.00

DownpaymentstyleC

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

2,135,000.00

InterestrateA

967,500.00

645,000.00

645,000.00

645,000.00

322,500.00

967,500.00

645,000.00

1,290,000.00

6,127,500.00

InterestrateB

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

3,300,000.00

InterestrateC

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

3,202,500.00

Cost A

6,450,000.00

4,300,000.00

4,300,000.00

4,300,000.00

2,150,000.00

6,450,000.00

4,300,000.00

8,600,000.00

40,850,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

22,000,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

21,350,000.00

15,312,500.00

12,625,000.00

12,625,000.00

9,937,500.00

15,312,500.00

12,625,000.00

18,000,000.00

105,250,000.00

Net sales

8,812,500.00

Cost of good sold


All Construction A

All Construction B

All Construction C

Total

Grossmargin

15,312,500.00

12,625,000.00

12,625,000.00

8,812,500.00

6,000.00

6,000.00

6,000.00

6,000.00

9,937,500.00

15,312,500.00

12,625,000.00

18,000,000.00

105,250,000.00

6,000.00

6,000.00

6,000.00

6,000.00

72,000.00

Operatating Expense
Marketing expense
Radio
Baanlaesuan Fair
Brochure
TotalMarketingexpense

6,000.00

6,000.00

6,000.00

6,000.00

50,000.00

5,900.00

50,000.00
5,900.00

61,900.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

127,900.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

237,500.00

2,850,000.00

Administration expense
EmployeeSalary
Officesupply

2,000.00

Utilityexpense

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

36,000.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

242,500.00

240,500.00

240,500.00

240,500.00

2,892,000.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

14,988,194.88

12,358,594.88

12,358,594.88

8,546,094.88 -

268,405.12 -

266,405.12

9,669,094.88

15,046,094.88

12,358,594.88

17,733,594.88

101,991,238.56
30,597,371.57

TotalAdministrationexpense
Depreciation
EBIT
Income Tax(30%)
Net Income Loss
Beginning Retain Earnings

2,000.00

266,405.12 -

266,405.12 -

2,000.00

6,000.00

4,496,458.46

3,707,578.46

3,707,578.46

2,563,828.46 -

80,521.54 -

79,921.54 -

79,921.54 -

79,921.54

2,900,728.46

4,513,828.46

3,707,578.46

5,320,078.46

10,491,736.42

8,651,016.42

8,651,016.42

5,982,266.42 -

187,883.58 -

186,483.58 -

186,483.58 -

186,483.58

6,768,366.42

10,532,266.42

8,651,016.42

12,413,516.42

71,393,866.99

114,953,536.19

124,396,098.96

132,182,013.73

144,847,202.61

144,679,367.38

150,770,897.16

160,249,936.93

168,035,851.70

179,208,016.48

Dividend (10%)

1,049,173.64

865,101.64

865,101.64

Retain earnings

124,396,098.96

132,182,013.73

139,967,928.51

139,967,928.51
598,226.64 145,351,968.28

145,351,968.28
18,788.36 145,182,873.06

145,182,873.06
18,648.36 145,015,037.83

106

145,015,037.83
18,648.36 144,847,202.61

18,648.36

676,836.64

1,053,226.64

865,101.64

1,241,351.64

7,139,386.70

144,679,367.38

150,770,897.16

160,249,936.93

168,035,851.70

179,208,016.48

243,462,496.77

Cash Flow
2013
Year

10

11

12

Total

Cash flow from operating


activities
Cash received
Down payment style A

215,000.00

215,000.00

215,000.00

Down payment style B

275,000.00

275,000.00

275,000.00

215,000.00
-

Down payment style C

305,000.00

Interest rate A

Interest rate B

215,000.00

215,000.00

275,000.00

275,000.00

64,500.00

64,500.00

82,500.00

82,500.00

Interest rate C

Cost A

2,150,000.00

2,150,000.00

2,150,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

Total cash received

8,745,000.00

5,390,000.00

5,390,000.00

2,150,000.00

2,150,000.00

2,150,000.00

2,750,000.00

2,750,000.00

2,365,000.00

5,537,000.00

5,537,000.00

215,000.00

1,505,000.00

1,375,000.00

305,000.00

610,000.00

64,500.00

193,500.00

165,000.00

91,500.00

91,500.00

2,150,000.00

15,050,000.00

13,750,000.00

3,050,000.00

6,100,000.00

5,876,000.00

38,840,000.00

Cash paid
All Construction A

1,750,000.00

1,750,000.00

1,050,000.00

700,000.00

1,400,000.00

1,750,000.00

1,050,000.00

350,000.00

350,000.00

700,000.00

10,850,000.00

All Construction B

2,500,000.00

2,500,000.00

1,500,000.00

1,000,000.00

2,000,000.00

2,500,000.00

1,500,000.00

500,000.00

500,000.00

1,000,000.00

15,500,000.00

All Construction C

3,500,000.00

3,500,000.00

2,100,000.00

1,400,000.00

2,800,000.00

3,500,000.00

2,100,000.00

700,000.00

700,000.00

1,400,000.00

21,700,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

72,000.00

Radio

6,000.00

Baanlaesuan Fair
Brochure
Employee Salary

50,000.00

5,900.00

237,500.00

Office supply

2,000.00

Utility expense

3,000.00

Tax

237,500.00
3,000.00

Total cash paid


Net cash provide by operating

6,000.00

900.00

304,400.00

247,400.00

304,400.00

8,497,600.00 -

237,500.00
3,000.00
-

237,500.00
3,000.00
-

237,500.00

237,500.00

2,000.00

3,000.00

3,000.00

900.00

237,500.00
3,000.00
-

237,500.00
3,000.00
-

237,500.00

237,500.00

2,000.00

3,000.00

3,000.00

237,500.00
3,000.00

50,000.00
5,900.00

237,500.00

2,850,000.00

6,000.00

3,000.00

36,000.00

900.00

900.00

7,996,500.00

7,996,500.00

4,898,500.00

3,347,400.00

6,446,500.00

7,996,500.00

4,898,500.00

1,797,400.00

1,797,400.00

3,346,500.00

51,073,500.00

3,600.00

2,606,500.00 -

2,606,500.00 -

4,898,500.00 -

3,347,400.00 -

6,446,500.00 -

7,996,500.00 -

2,533,500.00

3,739,600.00

3,739,600.00

2,529,500.00 -

12,233,500.00

Cash flow from investment


activities
Investment

19,183,726.00

19,183,726.00

Net cash provide by investment

19,183,726.00

19,183,726.00

285,011.64

273,627.68

285,011.64

273,627.68

Cash flow from financial


activities
Dividend paid

Net cash provide by financial

Net Cash Increase(Decrease)


Cash Beginning of the Month
Cash Ending of the Month

18,879,326.00
18,879,326.00

8,212,588.36 -

2,606,500.00 -

2,606,500.00 -

4,898,500.00 -

3,621,027.68 -

18,879,326.00

27,091,914.36

24,485,414.36

21,878,914.36

16,980,414.36

27,091,914.36

24,485,414.36

21,878,914.36

16,980,414.36

13,359,386.68

107

6,446,500.00 13,359,386.68
6,912,886.68 -

117,276.66

25,769.93

117,276.66 -

25,769.93

7,996,500.00 -

2,533,500.00

3,622,323.34

6,912,886.68 -

1,083,613.32 -

1,083,613.32 -

3,617,113.32

701,685.00
-

701,685.00

3,713,830.07

2,529,500.00

6,248,540.09

3,617,113.32

5,210.02

3,719,040.09

6,248,540.09

5,210.02

3,719,040.09

6,248,540.09

12,497,080.18

2014
Year

10

11

12

Total

Cash flow from operating


activities
Cash received
Down payment style A

430,000.00

215,000.00

215,000.00

Down payment style B

275,000.00

275,000.00

275,000.00

Down payment style C

305,000.00

305,000.00

Interest rate A

258,000.00

129,000.00

129,000.00

Interest rate B

165,000.00

165,000.00

165,000.00

Interest rate C

183,000.00

183,000.00

Cost A

4,300,000.00

2,150,000.00

2,150,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

3,050,000.00

11,716,000.00

9,222,000.00

5,684,000.00

All Construction A

350,000.00

350,000.00

1,050,000.00

700,000.00

700,000.00

350,000.00

350,000.00

3,850,000.00

All Construction B

500,000.00

500,000.00

1,500,000.00

1,000,000.00

1,000,000.00

500,000.00

500,000.00

5,500,000.00

All Construction C

700,000.00

700,000.00

2,100,000.00

1,400,000.00

1,400,000.00

700,000.00

700,000.00

7,700,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

Total cash received

215,000.00

129,000.00

2,150,000.00

2,494,000.00

215,000.00

129,000.00

2,150,000.00

2,494,000.00

215,000.00

215,000.00

430,000.00

2,150,000.00

275,000.00

275,000.00

275,000.00

1,650,000.00

305,000.00

305,000.00

1,220,000.00

129,000.00

129,000.00

258,000.00

1,290,000.00

165,000.00

165,000.00

165,000.00

990,000.00

183,000.00

183,000.00

732,000.00

2,150,000.00

2,150,000.00

4,300,000.00

21,500,000.00

2,750,000.00

2,750,000.00

2,750,000.00

16,500,000.00

3,050,000.00

3,050,000.00

12,200,000.00

9,222,000.00

11,716,000.00

58,232,000.00

5,684,000.00

Cash paid

Radio
Baanlaesuan Fair
Brochure
Employee Salary

6,000.00

6,000.00

6,000.00

6,000.00

50,000.00

5,900.00

237,500.00

Office supply

2,000.00

Utility expense

3,000.00

Tax

6,000.00

237,500.00
3,000.00

900.00

900.00

Total cash paid

1,855,300.00

1,797,400.00

Net cash provide by operating

9,860,700.00

7,424,600.00

237,500.00
3,000.00
4,896,500.00
787,500.00 -

237,500.00
3,000.00
3,346,500.00
852,500.00 -

237,500.00
2,000.00
3,000.00
-

237,500.00
3,000.00
-

237,500.00

237,500.00

3,000.00

3,000.00

237,500.00
2,000.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

72,000.00
50,000.00
5,900.00
2,850,000.00
6,000.00
36,000.00

900.00

900.00

900.00

900.00

900.00

6,300.00

3,348,500.00

1,796,500.00

1,796,500.00

247,400.00

249,400.00

247,400.00

247,400.00

247,400.00

20,076,200.00

3,348,500.00 -

1,796,500.00 -

1,796,500.00 -

247,400.00

2,244,600.00

5,436,600.00

8,974,600.00

11,468,600.00

38,155,800.00

Cash flow from investment


activities
Investment

Net cash provide by investment

Cash flow from financial


activities
Dividend paid
Net cash provide by financial
Net Cash Increase(Decrease)
Cash Beginning of the Month
Cash Ending of the Month

688,918.64

518,391.64

688,918.64 -

518,391.64

9,171,781.36

6,906,208.36

787,500.00 -

852,500.00 -

3,348,500.00 -

1,796,500.00 -

6,248,540.09

15,420,321.45

22,326,529.81

23,114,029.81

22,261,529.81

18,913,029.81

15,420,321.45

22,326,529.81

23,114,029.81

22,261,529.81

18,913,029.81

17,116,529.81

108

1,796,500.00 -

18,648.36

155,791.64

379,231.64

626,891.64

801,471.64

18,648.36 -

155,791.64 -

379,231.64 -

626,891.64 -

801,471.64 -

3,152,048.49
3,152,048.49

228,751.64

2,088,808.36

5,057,368.36

8,347,708.36

10,667,128.36

35,003,751.51

17,116,529.81

15,320,029.81

15,091,278.17

17,180,086.52

22,237,454.88

30,585,163.24

41,252,291.60

15,320,029.81

15,091,278.17

17,180,086.52

22,237,454.88

30,585,163.24

41,252,291.60

76,256,043.11

2015
Year

10

11

12

Total

Cash flow from operating


activities
Cash received
Down payment style A

430,000.00

215,000.00

430,000.00

Down payment style B

275,000.00

275,000.00

275,000.00

Down payment style C

305,000.00

305,000.00

305,000.00

Interest rate A

387,000.00

193,000.00

387,000.00

Interest rate B

247,500.00

247,500.00

247,500.00

Interest rate C

274,500.00

274,500.00

274,500.00

Cost A

4,300,000.00

2,150,000.00

4,300,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

12,019,000.00

9,460,000.00

12,019,000.00

Total cash received

275,000.00

247,500.00

2,750,000.00
3,272,500.00

215,000.00

430,000.00

215,000.00

645,000.00

430,000.00

3,010,000.00

275,000.00

275,000.00

275,000.00

275,000.00

2,200,000.00

305,000.00

305,000.00

1,830,000.00

387,000.00

193,000.00

580,500.00

387,000.00

2,707,500.00

247,500.00

247,500.00

247,500.00

247,500.00

1,980,000.00

274,500.00

274,500.00

1,647,000.00

3,050,000.00

3,629,500.00

193,000.00

2,150,000.00

2,558,000.00

305,000.00

274,500.00

4,300,000.00

2,150,000.00

6,450,000.00

4,300,000.00

30,100,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

22,000,000.00

3,050,000.00

3,050,000.00

18,300,000.00

14,577,500.00

12,019,000.00

83,774,500.00

8,389,500.00

5,830,500.00

Cash paid
All Construction A

All Construction B

All Construction C

Radio

6,000.00

Baanlaesuan Fair
Brochure
Employee Salary

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

2,000.00

Utility expense

3,000.00

Net cash provide by operating

6,000.00

5,900.00

Office supply

Total cash paid

6,000.00

50,000.00
237,500.00

Tax

6,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
2,000.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
2,000.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

72,000.00
50,000.00
5,900.00
2,850,000.00
6,000.00
36,000.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

10,800.00

305,300.00

247,400.00

247,400.00

247,400.00

249,400.00

247,400.00

247,400.00

247,400.00

249,400.00

247,400.00

247,400.00

247,400.00

3,030,700.00

11,713,700.00

9,212,600.00

11,771,600.00

3,025,100.00

247,400.00 -

247,400.00

3,382,100.00

8,140,100.00

5,583,100.00

14,330,100.00

11,771,600.00

80,743,800.00

2,308,600.00 -

Cash flow from investment


activities
Investment

Net cash provide by investment

Cash flow from financial


activities
Dividend paid
Net cash provide by financial

818,628.64

643,551.64

822,681.64

210,426.64

160,271.64 -

18,648.36 -

18,648.36

235,416.64

568,476.64

389,486.64

1,001,776.64

822,681.64

818,628.64 -

643,551.64 -

822,681.64 -

210,426.64 -

160,271.64

18,648.36

18,648.36 -

235,416.64 -

568,476.64 -

389,486.64 -

1,001,776.64 -

822,681.64 -

2,148,328.36 -

228,751.64 -

Net Cash Increase(Decrease)

10,895,071.36

8,569,048.36

10,948,918.36

2,814,673.36

Cash Beginning of the Month

41,252,291.60

52,147,362.96

60,716,411.32

71,665,329.67

74,480,003.03

Cash Ending of the Month

52,147,362.96

60,716,411.32

71,665,329.67

74,480,003.03

76,628,331.39

228,751.64

3,146,683.36

7,571,623.36

5,193,613.36

76,628,331.39

76,399,579.75

76,170,828.11

79,317,511.47

76,399,579.75

76,170,828.11

79,317,511.47

86,889,134.82

109

5,636,101.70
5,636,101.70

13,328,323.36

10,948,918.36

75,107,698.30

86,889,134.82

92,082,748.18

105,411,071.54

116,359,989.90

92,082,748.18

105,411,071.54

116,359,989.90

191,467,688.20

2016
Year

10

11

12

Total

Cash flow from operating


activities
Cash received
Down payment style A

430,000.00

645,000.00

215,000.00

430,000.00

215,000.00

430,000.00

645,000.00

430,000.00

3,440,000.00

Down payment style B

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

550,000.00

2,475,000.00

Down payment style C

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

2,135,000.00

Interest rate A

516,000.00

774,000.00

258,000.00

516,000.00

258,000.00

516,000.00

774,000.00

516,000.00

4,128,000.00

Interest rate B

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

330,000.00

660,000.00

2,970,000.00

Interest rate C

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

366,000.00

2,562,000.00

Cost A

4,300,000.00

6,450,000.00

2,150,000.00

4,300,000.00

2,150,000.00

4,300,000.00

6,450,000.00

4,300,000.00

34,400,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

5,500,000.00

24,750,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

21,350,000.00

12,322,000.00

14,945,000.00

9,699,000.00

9,699,000.00

12,322,000.00

14,945,000.00

15,677,000.00

98,210,000.00

Total cash received

8,601,000.00

Cash paid
All Construction A

All Construction B

All Construction C

Radio

6,000.00

Baanlaesuan Fair
Brochure
Employee Salary

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

2,000.00

Utility expense

3,000.00

Net cash provide by operating

6,000.00

5,900.00

Office supply

Total cash paid

6,000.00

50,000.00
237,500.00

Tax

6,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
2,000.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
2,000.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

72,000.00
50,000.00
5,900.00
2,850,000.00
6,000.00
36,000.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

10,800.00

305,300.00

247,400.00

247,400.00

247,400.00

249,400.00

247,400.00

247,400.00

247,400.00

249,400.00

247,400.00

247,400.00

247,400.00

3,030,700.00

12,016,700.00

14,697,600.00

9,451,600.00

249,400.00 -

247,400.00 -

247,400.00 -

247,400.00

9,449,600.00

12,074,600.00

14,697,600.00

15,429,600.00

95,179,300.00

8,353,600.00 -

Cash flow from investment


activities
Investment

Net cash provide by investment

Cash flow from financial


activities
Dividend paid
Net cash provide by financial

839,838.64

1,027,501.64

660,281.64

583,421.64 -

18,788.36 -

18,648.36 -

18,648.36 -

18,648.36

660,141.64

843,891.64

1,027,501.64

1,078,741.64

839,838.64 -

1,027,501.64 -

660,281.64 -

583,421.64

18,788.36

18,648.36

18,648.36

18,648.36 -

660,141.64 -

843,891.64 -

1,027,501.64 -

1,078,741.64 -

7,770,178.36 -

230,611.64 -

228,751.64 -

228,751.64 -

Net Cash Increase(Decrease)

11,176,861.36

13,670,098.36

8,791,318.36

Cash Beginning of the Month

116,359,989.90

127,536,851.26

141,206,949.62

149,998,267.97

157,768,446.33

157,537,834.69

Cash Ending of the Month

127,536,851.26

141,206,949.62

149,998,267.97

157,768,446.33

157,537,834.69

157,309,083.05

110

6,646,586.70
6,646,586.70

228,751.64

8,789,458.36

11,230,708.36

13,670,098.36

14,350,858.36

88,532,713.30

157,309,083.05

157,080,331.41

156,851,579.77

165,641,038.13

176,871,746.48

190,541,844.84

204,892,703.20

157,080,331.41

156,851,579.77

165,641,038.13

176,871,746.48

190,541,844.84

204,892,703.20

293,425,416.50

2017
Year

10

11

12

Total

Cash flow from operating


activities
Cash received
Down payment style A

645,000.00

430,000.00

430,000.00

430,000.00

215,000.00

645,000.00

430,000.00

860,000.00

4,085,000.00

Down payment style B

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

275,000.00

2,200,000.00

Down payment style C

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

305,000.00

2,135,000.00

Interest rate A

967,500.00

645,000.00

645,000.00

645,000.00

322,500.00

967,500.00

645,000.00

1,290,000.00

6,127,500.00

Interest rate B

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

412,500.00

3,300,000.00

Interest rate C

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

457,500.00

3,202,500.00

Cost A

6,450,000.00

4,300,000.00

4,300,000.00

4,300,000.00

2,150,000.00

6,450,000.00

4,300,000.00

8,600,000.00

40,850,000.00

Cost B

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

2,750,000.00

22,000,000.00

Cost C

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

3,050,000.00

21,350,000.00

15,312,500.00

12,625,000.00

12,625,000.00

9,937,500.00

15,312,500.00

12,625,000.00

18,000,000.00

105,250,000.00

Total cash received

8,812,500.00

Cash paid
All Construction A

All Construction B

All Construction C

Radio

6,000.00

Baanlaesuan Fair
Brochure
Employee Salary

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

2,000.00

Utility expense

3,000.00

Net cash provide by operating

6,000.00

5,900.00

Office supply

Total cash paid

6,000.00

50,000.00
237,500.00

Tax

6,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
2,000.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
2,000.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

237,500.00
3,000.00

72,000.00
50,000.00
5,900.00
2,850,000.00
6,000.00
36,000.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

900.00

10,800.00

305,300.00

247,400.00

247,400.00

247,400.00

249,400.00

247,400.00

247,400.00

247,400.00

249,400.00

247,400.00

247,400.00

247,400.00

3,030,700.00

15,007,200.00

12,377,600.00

12,377,600.00

249,400.00 -

247,400.00 -

247,400.00 -

247,400.00

9,688,100.00

15,065,100.00

12,377,600.00

17,752,600.00

102,219,300.00

8,565,100.00 -

Cash flow from investment


activities
Investment

Net cash provide by investment

Cash flow from financial


activities
Dividend paid
Net cash provide by financial

1,049,173.64

865,101.64

865,101.64

598,226.64 -

18,788.36 -

18,648.36 -

18,648.36 -

18,648.36

676,836.64

1,053,226.64

865,101.64

1,241,351.64

1,049,173.64 -

865,101.64 -

865,101.64 -

598,226.64

18,788.36

18,648.36

18,648.36

18,648.36 -

676,836.64 -

1,053,226.64 -

865,101.64 -

1,241,351.64 -

7,966,873.36 -

230,611.64 -

228,751.64 -

228,751.64 -

Net Cash Increase(Decrease)

13,958,026.36

11,512,498.36

11,512,498.36

Cash Beginning of the Month

204,892,703.20

218,850,729.56

230,363,227.92

241,875,726.28

249,842,599.63

249,611,987.99

Cash Ending of the Month

218,850,729.56

230,363,227.92

241,875,726.28

249,842,599.63

249,611,987.99

249,383,236.35

111

7,139,386.70
7,139,386.70

228,751.64

9,011,263.36

14,011,873.36

11,512,498.36

16,511,248.36

95,079,913.30

249,383,236.35

249,154,484.71

248,925,733.07

257,936,996.43

271,948,869.78

283,461,368.14

299,972,616.50

249,154,484.71

248,925,733.07

257,936,996.43

271,948,869.78

283,461,368.14

299,972,616.50

395,052,529.80

Balance Sheet
2013
Year

10

11

12

Total

Asset
Current Asset
Cash

18,879,326.00

27,091,914.36

24,485,414.36

21,878,914.36

16,980,414.36

13,359,386.68

6,912,886.68 -

1,083,613.32 -

3,617,113.32

5,210.02

3,719,040.09

6,248,540.09

134,860,320.36

Total Current Asset

18,879,326.00

27,091,914.36

24,485,414.36

21,878,914.36

16,980,414.36

13,359,386.68

6,912,886.68 -

1,083,613.32 -

3,617,113.32

5,210.02

3,719,040.09

6,248,540.09

134,860,320.36

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

2,866,320.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

3,105,181.44

19,138,091.12

27,350,679.48

24,744,179.48

22,137,679.48

17,239,179.48

13,618,151.80

3,358,348.20

263,975.14

3,977,805.21

6,507,305.21

137,965,501.80

Fixed Asset
PurchasedTools & Equipment
Less: Accumulated Depreciation
Total Fixed Asset
Total Asset

7,171,651.80 -

824,848.20 -

Liabilities

Liabilities
Total Liabilities

Owner's Equipties
Long term investing

19,462,396.24

22,333,469.83

324,305.12

5,017,209.65

Total Owner's Equipties

19,138,091.12

27,350,679.48

24,744,179.48

22,137,679.48

17,239,179.48

Total Liabilities & Owner's Equipties

19,138,091.12

27,350,679.48

24,744,179.48

22,137,679.48

17,239,179.48

Retain Earning

22,353,374.95
2,390,804.53 -

22,373,280.07
235,600.59 -

22,393,185.19
5,154,005.71 -

20,892,992.73

20,912,897.85

20,932,802.97

20,952,708.09

22,231,056.66

23,340,470.31

23,360,375.43

261,539,010.32

13,741,246.05 -

21,757,651.17 -

24,311,056.29 -

21,967,081.52 -

19,362,665.10 -

16,853,070.22 -

123,573,508.52

13,618,151.80

7,171,651.80 -

824,848.20 -

3,358,348.20

263,975.14

3,977,805.21

6,507,305.21

137,965,501.80

13,618,151.80

7,171,651.80 -

824,848.20 -

3,358,348.20

263,975.14

3,977,805.21

6,507,305.21

137,965,501.80

7,274,840.93 -

2014
Year

10

11

12

Total

Asset
Current Asset
Cash

15,420,321.45

22,326,529.81

23,114,029.81

22,261,529.81

18,913,029.81

17,116,529.81

15,320,029.81

15,091,278.17

17,180,086.52

22,237,454.88

30,585,163.24

41,252,291.60

260,818,274.72

Total Current Asset

15,420,321.45

22,326,529.81

23,114,029.81

22,261,529.81

18,913,029.81

17,116,529.81

15,320,029.81

15,091,278.17

17,180,086.52

22,237,454.88

30,585,163.24

41,252,291.60

260,818,274.72

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

2,866,320.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

3,105,181.44

15,679,086.57

22,585,294.93

23,372,794.93

22,520,294.93

19,171,794.93

17,375,294.93

15,578,794.93

15,350,043.29

17,438,851.64

22,496,220.00

30,843,928.36

41,511,056.72

263,923,456.16

Fixed Asset
PurchasedTools & Equipment
Less: Accumulated Depreciation
Total Fixed Asset
Total Asset
Liabilities

Liabilities
Total Liabilities

Owner's Equipties
Long term investing
Retain Earning

26,331,889.02
-

10,652,802.45 -

28,572,572.60
5,987,277.67 -

28,592,477.72
5,219,682.79 -

28,612,382.84
6,092,087.91 -

28,632,287.96
9,460,493.03 -

28,652,193.08

28,672,098.20

28,611,181.79

29,297,865.36

11,276,898.15 -

13,093,303.27 -

13,261,138.50 -

11,859,013.72 -

30,942,148.95
8,445,928.95 -

33,647,832.53
2,803,904.17

37,101,716.12
4,409,340.60 -

357,666,646.17
93,743,190.01

Total Owner's Equipties

15,679,086.57

22,585,294.93

23,372,794.93

22,520,294.93

19,171,794.93

17,375,294.93

15,578,794.93

15,350,043.29

17,438,851.64

22,496,220.00

30,843,928.36

41,511,056.72

263,923,456.16

Total Liabilities & Owner's Equipties

15,679,086.57

22,585,294.93

23,372,794.93

22,520,294.93

19,171,794.93

17,375,294.93

15,578,794.93

15,350,043.29

17,438,851.64

22,496,220.00

30,843,928.36

41,511,056.72

263,923,456.16

112

2015
Year

10

11

12

Total

Asset
Current Asset
Cash

52,147,362.96

60,716,411.32

71,665,329.67

74,480,003.03

76,628,331.39

76,339,579.75

76,170,828.11

79,317,511.47

86,889,134.82

92,082,748.18

105,411,071.54

116,359,989.90

968,208,302.14

Total Current Asset

52,147,362.96

60,716,411.32

71,665,329.67

74,480,003.03

76,628,331.39

76,399,579.75

76,170,828.11

79,317,511.47

86,889,134.82

92,082,748.18

105,411,071.54

116,359,989.90

968,268,302.14

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

2,866,320.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

3,105,181.44

52,406,128.08

60,975,176.44

71,924,094.79

74,738,768.15

76,887,096.51

76,658,344.87

76,429,593.23

79,576,276.59

87,147,899.94

92,341,513.30

105,669,836.66

116,618,755.02

971,373,483.58

Fixed Asset
PurchasedTools & Equipment
Less: Accumulated Depreciation
Total Fixed Asset
Total Asset
Liabilities

Liabilities
Total Liabilities

Owner's Equipties
Long term investing

40,629,129.71

43,406,213.29

46,950,996.87

47,871,830.45

48,577,114.04

48,516,797.62

48,455,881.21

49,483,814.79

51,939,148.37

53,627,381.96

57,939,715.54

61,484,499.13

598,882,522.98

Retain Earning

11,776,998.37

17,568,963.15

24,973,097.92

26,866,937.70

28,309,982.47

28,141,547.25

27,973,712.02

30,092,461.80

35,208,751.57

38,714,131.34

47,730,121.12

55,134,255.89

372,490,960.60

Total Owner's Equipties

52,406,128.08

60,975,176.44

71,924,094.79

74,738,768.15

76,887,096.51

76,658,344.87

76,429,593.23

79,576,276.59

87,147,899.94

92,341,513.30

105,669,836.66

116,618,755.02

971,373,483.58

Total Liabilities & Owner's Equipties

52,406,128.08

60,975,176.44

71,924,094.79

74,738,768.15

76,887,096.51

76,658,344.87

76,429,593.23

79,576,276.59

87,147,899.94

92,341,513.30

105,669,836.66

116,618,755.02

971,373,483.58

2016
Year

10

11

12

Total

Asset
Current Asset
Cash

127,536,851.26

141,206,949.62

149,998,267.97

157,768,446.33

157,537,834.69

157,309,083.05

157,080,331.41

156,851,579.77

165,641,038.13

176,871,746.48

190,541,844.84

204,892,703.20

1,943,236,676.75

Total Current Asset

127,536,851.26

141,206,949.62

149,998,267.97

157,768,446.33

157,537,834.69

157,309,083.05

157,080,331.41

156,851,579.77

165,641,038.13

176,871,746.48

190,541,844.84

204,892,703.20

1,943,236,676.75

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

2,866,320.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

3,105,181.44

127,795,616.38

141,465,714.74

150,257,033.09

158,027,211.45

157,796,599.81

157,567,848.17

157,339,096.53

157,110,344.89

165,899,803.25

177,130,511.60

190,800,609.96

205,151,468.32

1,946,341,858.19

Fixed Asset
PurchasedTools & Equipment
Less: Accumulated Depreciation
Total Fixed Asset
Total Asset
Liabilities
Liabilities
Total Liabilities

Owner's Equipties
Long term investing

65,102,812.71

69,525,396.30

72,374,179.87

74,893,563.46

74,832,047.05

74,771,130.63

74,710,214.22

74,649,297.80

77,497,481.39

81,133,164.96

85,555,748.55

90,197,932.13

915,242,969.07

Retain Earning

62,692,803.67

71,940,318.44

77,882,853.22

83,133,647.99

82,964,552.76

82,796,717.54

82,628,882.31

82,461,047.09

88,402,321.86

95,997,346.64

105,244,861.41

114,953,536.19

1,031,098,889.12

Total Owner's Equipties

127,795,616.38

141,465,714.74

150,257,033.09

158,027,211.45

157,796,599.81

157,567,848.17

157,339,096.53

157,110,344.89

165,899,803.25

177,130,511.60

190,800,609.96

205,151,468.32

1,946,341,858.19

Total Liabilities & Owner's Equipties

127,795,616.38

141,465,714.74

150,257,033.09

158,027,211.45

157,796,599.81

157,567,848.17

157,339,096.53

157,110,344.89

165,899,803.25

177,130,511.60

190,800,609.96

205,151,468.32

1,946,341,858.19

113

2017
Year

10

11

12

Total

Asset
Current Asset
Cash

218,850,729.56

230,363,227.92

241,875,726.28

249,842,599.63

249,611,987.99

249,383,236.35

249,154,484.71

248,925,733.07

257,936,996.43

271,948,869.78

283,461,368.14

299,972,616.50

3,051,327,576.36

Total Current Asset

218,850,729.56

230,363,227.92

241,875,726.28

249,842,599.63

249,611,978.99

249,383,236.35

249,154,484.71

248,925,733.07

257,936,996.43

271,948,869.78

283,461,368.14

299,972,616.50

3,051,327,567.36

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

238,860.00

2,866,320.00

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

19,905.12

238,861.44

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

258,765.12

3,105,181.44

219,109,494.68

230,621,993.04

242,134,491.40

250,101,364.75

249,870,744.11

249,642,001.47

249,413,249.83

249,184,498.19

258,195,761.55

272,207,634.90

283,720,133.26

300,231,381.62

3,054,432,748.80

Fixed Asset
PurchasedTools & Equipment
Less: Accumulated Depreciation
Total Fixed Asset
Total Asset
Liabilities
Liabilities
Total Liabilities

Owner's Equipties
Long term investing

94,713,395.72

98,439,979.31

102,166,562.89

104,749,396.47

104,687,871.05

104,626,963.64

104,566,047.22

104,505,130.81

107,424,864.39

111,957,697.97

115,684,281.56

121,023,365.14

1,274,545,556.17

Retain Earning

124,396,098.96

132,182,013.73

139,967,928.51

145,351,968.28

145,182,873.06

145,015,037.83

144,847,202.61

144,679,367.38

150,770,897.16

160,249,936.93

168,035,851.70

179,208,016.48

1,779,887,192.63

Total Owner's Equipties

219,109,494.68

230,621,993.04

242,134,491.40

250,101,364.75

249,870,744.11

249,642,001.47

249,413,249.83

249,184,498.19

258,195,761.55

272,207,634.90

283,720,133.26

300,231,381.62

3,054,432,748.80

Total Liabilities & Owner's Equipties

219,109,494.68

230,621,993.04

242,134,491.40

250,101,364.75

249,870,744.11

249,642,001.47

249,413,249.83

249,184,498.19

258,195,761.55

272,207,634.90

283,720,133.26

300,231,381.62

3,054,432,748.80

114

Chapter8: Risk Analysis


Risk analysis
Risk analysis is a technique to identify and assess factors that may endanger the
success of project or achieving goal.
The top five sources of risk are inexperienced contractor in IBS project, complexity in design,
contractor performance failure, inappropriate estimate of construction cost, And variety of
design. Based on four stages of construction which are the initial stage, tendering stage,
procurement stage and implementing stage; initial stage contributes to the highest risk in
industrialized building system. The problem of quality, poor productivity, defective materials,
labor disputes and loss or delay due to resources availability are on contractors shoulder. The
building owners are responsible on variation of work, sales and marketing, and deficiencies in
specification and drawing. The result of this study reveals that there is no relation between types
of industrialized building system being used and types of risk. Three categories of risk which are
financial risk, construction risk and design risk are interrelated with each other. A tentative risk
register tool produced in this study is based on computer application. It may help developers to
identify sources of risk, evaluate and manage the identified risks as part of decision making
Instead of improving the efficiency of managing project risks, the Thai government has been
promoting the application of new building system strategies for the implementation of building
construction, in particular, the mechanism of industrialized building system. The Thai
government have encourages constructors to use industrialized building system in construction
and to reduce the dependency on foreign labor, to increase productivity, quality and safety in the
local construction industry, and also to minimize the risks in construction works
6.1.1 External Forces
6.1.1.1 Competitive risk
Now a day there are almost 50 company housing develop in Chiang Rai, but in the
Chiang Kong has just only 1 place. Although housing develop has only 1 place in Chiang Kong
but they also have good operation, good strategies Etc.
Solution
We need to closely monitor in the real estate market situation and the economic directions,
reduce more amount to building before, made by quality, control of cost, reduce
in expenses, focus on service and add satisfaction to our customers. For marketing we will make
a difference for maintain total sales, we also have emphasize after sale service which may affect
to overall profitability.

115

6.1.1.2. Power of purchase risk


The risk may cause from the slowdown of the world economy, which affect to
exports. When the export decline, it will large affect to Thailand's economy. Because
of economic growth dependence on exports at a higher rate, that make to unemployment
problem include with heavy problems of political and social may be consumers will have no
confidence and be more careful about spending.
Solution the company will set the price are cheaper than other company but we still
have a good quality in house. As following government policy first house that will reduce tax
10 % but total have no more 500,000 Bath
Economy
Economic is always change by many reason with itself as Thai economic have down by
flooding disaster in 2011. This is effect to customer power to purchase which they carefully
to decide to do something in their life must be useful. It is effect to every business in
economic system. For housing develop is for people or business man have to contract with
border. As economic change by flood it takes customer power are decrease such as revenue
of people and business man decrease follow trend all of Thailand.
Solution Economic changes: Check the quality of product in daily, month, and year.
Moreover, promote to persuade customer.
6.1.2 Internal risks for which the observer himself can be responsible include egotism,
ambition, resistance to change and pessimism. Additional risks arise within companies as
well, including, for example, blind faith in figures, lack of checks and balances, tunnel vision
or short-term thinking. Usually, the internal risks are pushed to the background in light of the
visible portent of the external risks.
1. Human Resource
Internal risk that include employee such as accountant, marketer, security and etc. We
have no idea how efficiency in each position but we have to foster or train employee that
love what they going to do in our company. All workers under control of outsourcing
company but if they unhappy to work with us it will be a big problem such as stop to built a
house and gone.
2. Integrity Risk
This assessment has not covered a number of areas related to the provision of social housing
that may be subject to corruption risks. Perhaps the important of these is the construction of
housing itself, from the purchase/selection of land, through tendering to monitoring and
enforcement of construction quality. These may be regarded as general public works
procurement risks, and are beyond the capacity of an assessment of this size to address
adequately. Other risks include for example corruption involving contracts for housing
maintenance.
116

So, ModernEmpireVillagehave to set a policy to lets our employeeunderstand in the same


way.
Employee fraud,
Every one, every organize need to honesty with themselves first because if employee fraud
happen in once will affect all the process. Fraud occur all the position for example
- Marketing project
Employee does not activities to reach the goal or not do it
it same our company have to set. From this reason we set to
they did on the report every day

customer record everything

-Accounting
These departments are a lot of fraud because is easy to have a mistake and hard to find the
main of problem. From this reason employee need to submit to manager every time and can
answer every question of manger
3. Time management risk
Time is important thing .We must use every second to useful. Thats reason we need to
management time. If we take more time to one process it will affect all the process. Ex: If my
organize have someone do every things for killing time like dawdle man I have to warning
them because its not a good pattern for new employee.

So, we have to set schedule for our employee to remind them by many channel such as letter,
e-mail and they and call to ask about information on the working time. Outsourcing not
finishes work on the time. Modern empire village has to outsourcing for built a house for us.
This will be a big problem, because more time need to spend more money and we cant
control them, such as on the contract have to fixed when a house will allow customer to live.
Therefore, we made the contract for this situation that if outsourcing not finishes work on the
time they need to pay some compensation to our company. For make sure that they will work
on the time
Office
1. LIGHTWEIGHT CELLULAR CONCRETE BLOCK (Q con) 4M. 90,000 Bath
2. Roof metal sheet

180,000 Bath

3. Cement

200,000 Bath

4. Tile (Cotto)

64,000 Bath

5. Foundation pile

200,000 Bath
117

6. Door

65,000

7.Metal sheet

450,000 Bath

8. Dim

150,000 Bath

9. Exterior Paint (Toa)

65,000

Total

Bath

Bath

1,464,000 Bath

118

Risk of sale decrease 5% for 5 Years

Year 1
Revenue
Sale
Sale Decrease 5%
Sale Decrease
Net sale
Cost of goods sold
Cost of goods sold
Gross profit
Expense
Adiministration expense
Depreciation
Marketing expense
Total Operating expense
EBIT
Taxable income
Taxes (30%)
Net income
Dividend
Addition retain earning

Modern Empire Village


Profit/Loss statement
Year 2

Year 3

Year 4

Year 5

38,840,000
0.05
1942000
36,898,000

58,232,000
0.05
2911600
55,320,400

83,774,500
0.05
4188725
79,585,775

98,210,000
0.05
4910500
93,299,500

105,250,000
0.05
5262500
99,987,500

48,050,000
-11,152,000

17,050,000
38,270,400

0
79,585,775

0
93,299,500

0
99,987,500

2,890,000
238,861.44
127,900
3,256,761.44
-14,408,761.44

2,892,000
238,861.44
127,900
3,258,761.44
35,011,638.56

2,892,000
238,861.44
127,900
3,258,761.44
76,327,013.56

2,892,000
238,861.44
127,900
3,258,761.44
90,040,738.56

2,892,000
238,861.44
127,900
3,258,761.44
96,728,738.56

-4322628.432
-10,086,133.01
-1008613.301
-11,094,746.31

10503491.57
24,508,146.99
2450814.699
26,958,961.69

22898104.07
53,428,909.49
5342890.949
58,771,800.44

27012221.57
63,028,516.99
6302851.699
69,331,368.69

29018621.57
67,710,116.99
6771011.699
74,481,128.69

119

Risk sale increase 5% for 5 Years

Year 1
Revenue
Sale
Sale Increase 5%
Sale Increase
Net sale
Cost of goods sold
Cost of goods sold
Gross profit
Expense
Adiministration expense
Depreciation
Marketing expense
Total Operating expense
EBIT
Taxable income
Taxes (30%)
Net income
Dividend
Addition retain earning

Modern Empire Village


Profit/Loss statement
Year 2

Year 3

Year 4

Year 5

38,840,000
0.05
1942000
40,782,000

58,232,000
0.05
2911600
61,143,600

83,774,500
0.05
4188725
87,963,225

98,210,000
0.05
4910500
103,120,500

105,250,000
0.05
5262500
110,512,500

48,050,000
-7,268,000

17,050,000
44,093,600

0
87,963,225

0
103,120,500

0
110,512,500

2,890,000
238,861.44
127,900
3,256,761.44
-10,524,761.44

2,892,000
238,861.44
127,900
3,258,761.44
40,834,838.56

2,892,000
238,861.44
127,900
3,258,761.44
84,704,463.56

2,892,000
238,861.44
127,900
3,258,761.44
99,861,738.56

2,892,000
238,861.44
127,900
3,258,761
107,253,739

-10,524,761.74
0.30
0.03
0.33

12250451.57
28,584,386.99
2858438.699
31,442,825.69

25411339.07
59,293,124.49
5929312.449
65,222,436.94

29958521.57
69,903,216.99
6990321.699
76,893,538.69

32176121.57
75,077,617
7507761.699
82,585,379

120

Modern Empire State


Profit/Loss statement
Year 2
Year 3

Year 1
Revenue
Sale
Sale Decrease 10%
Sale Decrease
Net sale
Cost of good sold
Cost of good sold
Gross profit
Expense
Administration Expense
Depreciation
Marketing expense
Total operating expense
EBIT
Taxable income
Taxes (30%)
Netincome
Divident
Addition retain earning

Year 4

Year 5

38,840,000
0.1
3884000
34,956,000

58,232,000
0.1
5823200
52,408,800

83,774,500
0.1
8377450
75,397,050

98,210,000
0.1
9821000
88,389,000

105,250,000
0.1
10525000
94,725,000

48,050,000
-13,094,000

17,050,000
35,358,800

0
18,813,778

0
15,037,528

0
15,037,528

2,890,000
238,861.44
127,900
3,256,761.44
-16,350,761.44

2890000
238,861.44
127,900
3,256,761.44
32,102,039

2890000
238,861.44
127,900
3,256,761.44
15,557,016.56

2890000
238,861.44
127,900
3,256,761.44
11,780,766.56

2890000
238,861.44
127,900
3,256,761.44
11,780,766.56

-4905228.432
-11,445,533.01
-1144553.301
-12590086.31

9630611.568
22,471,427
2247142.699
24718569.69

4667104.968
10889911.59
1088991.159
11978902.75

3534229.968
8246536.592
824653.6592
9071190.251

3534229.968
8246536.592
824653.6592
9071190.251

121

Modern Empire State


Profit/Loss statement
Year 2
Year 3

Year 1
Revenue
Sale
Sale Increase 10%
Sale Increase
Net sale
Cost of good sold
Cost of good sold
Gross profit
Expense
Administration Expense
Depreciation
Marketing expense
Total operating expense
EBIT
Taxable income
Taxes (30%)
Netincome
Divident
Addition retain earning

Year 4

Year 5

38,840,000
0.1
3884000
42,724,000

58,232,000
0.1
5823200
64,055,200

83,774,500
0.1
8377450
92,151,950

98,210,000
0.1
9821000
108,031,000

105,250,000
0.1
10525000
115,775,000

48,050,000
-5,326,000

17,050,000
47,005,200

0
18,813,778.15

0
15,037,528.15

0
115775000

2890000
238,861.44
127,900
3256761.44
-8,582,761

2890000
238,861.44
127,900
3256761.44
43,748,439

2890000
238,861.44
127,900
3256761.44
15,557,016.71

2890000
238,861.44
127,900
3256761.44
11,780,766.71

2890000
238,861.44
127,900
3256761.44
112518238.6

-2574828.432
-6,007,933
-600793.3008
-6608726.309

13124531.57
30,623,907
3062390.699
33686297.69

4667105.013
10889911.7
1088991.17
11978902.87

3534230.013
8246536.697
824653.6697
9071190.367

16877735.78
112518238.3
11251823.83
123770062.1

122

Profit / Loss Management


Year 1
Year 2
Revenue
Sale
Sale Decrease 15%
Sale Decrease
Net sale
Cost of goods sold
Cost of goods sold
Gross profit
Expense
Administration express
Depreciation
Marketing Expense
Total operating expense
EBIT
Taxable income
Taxes (30%)
Net income
Dividend
Addition retain earning

Year 3

Year 4

Year 5

38,840,000.00
0.15
5,546,396.55
33,293,603.45

58,232,000.00
0.15
3,447,596.55
54,784,403.45

83,774,500.00
0.15
2,970,596.55
80,803,903.45

98,210,000.00
0.15
2,374,346.55
95,835,653.45

105,250,000.00
0.15
2,374,346.55
102,875,653.45

48,050,000.00
14,756,396.55

17,050,000.00
37,734,403.45

0
80,803,903.45

0
95,835,653.45

0
102,875,653.45

2,890,000.00
238,861.44
127,900.00
3,256,761.44
11,499,635.11 -

2,892,000.00
238,861.44
127,900.00
3,258,761.44
34,475,642.01

2,892,000.00
238,861.44
127,900.00
3,258,761.44
77,545,142.01

2,892,000.00
238,861.44
127,900.00
3,258,761.44
92,576,892.01

2,892,000.00
238,861.44
127,900.00
3,258,761.44
99,616,892.01

4,426,918.97
7,072,716.15 707,271.61 7,779,987.76 -

11,320,321.04
45,795,963.05
4,579,596.30
50,375,559.35

24,241,171.04
53,303,970.98
5,330,397.10
58,634,368.07

28,750,696.04
63,826,195.98
6,382,619.60
70,208,815.57

30,862,696.04
68,754,195.98
6,875,419.60
75,629,615.57

123

Modren Empire Village


Profit / Loss Management
Year 1
Year 2
Revenue
Sale
Sale Increase 15%
Sale Increase
Net sale
Cost of goods sold
Cost of goods sold
Gross profit
Expense
Administration express
Depreciation
Marketing Expense
Total operating expense
EBIT
Taxable income
Taxes (30%)
Net income
Dividend
Addition retain earning

Year 3

Year 4

Year 5

38,840,000.00
0.15
5,546,396.55
42,522,373.55

58,232,000.00
0.15
3,447,596.55
26,431,573.55

83,774,500.00
0.15
2,970,596.55
22,774,573.55

98,210,000.00
0.15
2,374,346.55
18,203,323.55

105,250,000.00
0.15
2,374,346.55
18,203,323.55

48,050,000.00
5,527,626.45

17,050,000.00
9,381,573.55

0
22,774,573.55

0
18,203,323.55

0
18,203,323.55

2,890,000.00
238,861.44
127,900.00
3,256,761.44
8,784,387.89

2,892,000.00
238,861.44
127,900.00
3,258,761.44
6,122,812.11

2,892,000.00
238,861.44
127,900.00
3,258,761.44
19,515,812.11

2,892,000.00
238,861.44
127,900.00
3,258,761.44
14,944,562.11

2,892,000.00
238,861.44
127,900.00
3,258,761.44
14,944,562.11

2,635,316.37
6,149,071.52
614,907.15
6,763,978.68

1,836,843.63
4,285,968.48
428,596.85
4,714,565.32

5,854,743.63
13,661,068.48
1,366,106.85
15,027,175.32

5,854,743.63
9,089,818.48
908,981.85
9,998,800.32

4,483,368.63
10,461,193.48
1,046,119.35
11,507,312.82

124

Chapter 9: Summary
Summary
House is basic need for human, they use the house for live, relax and meeting with
family. The member in the family is the important thing for make to happy and the livable in
house, but the one thing is importance not less than the member are design, location,
facilities, comfortable and livable house. Nowadays, real estate business is popular and
interesting make to real estate market has many investors and competitor but almost they still
get the profit from the business. In Chiang rai has many investors to invest in this business
and the housing market in north of Thailand is likely growing. Especially if a company is
a professional home, service standards and create a home with quality expanding into the
province in Chiang rai. There is a choice and liking of consumers and people who want a
quality home. So we plan to do the business in Chiang rai because, it have area to connect
with neighboring country, and connect with Mea khong river that is the most important way
to communicate and logistic product in this region. Chiang rai has many good factors to
do business for location, it located in north that make to has good weather and many tourist
attraction for attract tourist, for communication, it is quite large province so it has various and
convenient in communication. According from the factor our company think, we have
advantage for do the project and expect to the project can make profit to the company. For
our business is residential housing development, concentrating particularly on single
detached houses. The location was set at Chiang khong district Chiang rai area about 30 Rai
for building, as the atmospheres around of location are natural environments, good view and
near Thai-Laos Friendship Bridge. It make inmate are relax, peaceful and private at the same
time, the transportation was convenient. This location was suitable to build the project 3 types
are depending on satisfaction, life style and prefer of customer or include with occupation
and salary too. We use space about 30 Rai and we will build total 126 houses. We have
provided 3 types of houses
STP Analysis, market segmentation we concern about the lifestyle of customer by
focus on the single detached house market, it is popular for customer. For target group are
divide 2 groups, first group is big family, which mean have many members in the family and
want to live together include our houses are large and wide suitable for big family. Second
group is investor that they want to have a new house office that set up for support their
business. From the segment and target, we must to make identity position for attack our target
by We focus on the area to full capacity. Include with facilities as bathroom, kitchen room,
bedroom, and living room that make feel widely, splendid like contemporary style form that,
make you enjoy to rest with nature. This is a new concept design combines various style
especially you are style and have many service serve to them. Marketing Mix Strategy
includes product, price, place and promotion. Second is price, we set the price similar the
competitor, not to high and lower than the competitor and concern about the external factor.
Third is place, we set our project at Chiang khong because Chiang khong have area connect
with neighboring country, and Mea khong river. 80 percent of Landscape are forest and grove
125

wood that make weather in there cold, and have port that is receives and transfer product with
China that make there have good economy. The last is promotion our project will set
promotion into three styles.1. First Style (Neo Modern style) we set price of this style in
2,150,000 baht, free interest in six month and then they pay in normal rate after the
promotion, Ready to move in. Get Furniture + Air conditioner.* (companys conditions
apply). 2. Second Style (Modern Resort style) we set price of this style in 2,750,000 baht free
interest in six month and then they pay in normal rate after the promotion, ready to move in,
free! Furniture / Kitchen set / Air conditioner*(companys conditions apply) 3. Third Style
(Modern exclusive style) we set price of this style in 3,050,000 baht, free interest in six
month and then they pay in normal rate after the promotion, ready to move in, fully furnished
houses on the main road* (companys conditions apply)
Modern Empire village is a real estate business; our project has to manage the
organization by register Modern Empire village project to company limited. We have
estimate and calculate the administration cost are include employee salary, stationary expense
and facility cost are include rate of electricity expense, rate of water expense, telephone &
internet expense. We have to do the organization chat in order to set people who have
qualifications that appropriate with each position to work and develop the organization. We
will select and recruit employees by their characteristic and qualifications and set them in
the position, task and responsibility of employees.
The risk of our business can divide in to external and internal risk. The external has
many factors such as economic, political, social, power of purchase and competitive These
cannot control and it can make more effect to our business, so we must to make attraction and
interesting to customer by produce the high quality house include many facilities and concern
about the customer need and want. The internal risk happen in organization such as human
resource, integrity risk, employee fraud, time management, and financial risk these we can
control by set the same goal, do the work in standard and have carefully in expenses.
Conclusion, Modern empire village company has a feasibility to invest in Chiang
khong Chiang rai market, because in this market is interesting that can do the business which
it can gain profit and successful.

126

Reference
http://lib.stamford.edu/myfile/305.pdf)
http://www.lannarealty.com/

www.thaiappraisal.org/thai/market/market_view.php?strquery=market273.htm
http://www.thaiappraisal.org/thai/market/market_view.php?strquery=market304.htm
http://www.dailyworldtoday.com/columblank.php?colum_id=77447
http://www.hotelthailand.com/nonthaburi/richmond-stylish-convention/facilities.html
http://pooldesignideas.blogspot.com/2012/11/swiming-pool.html
http://www.miamicondolifestyle.com/fisher-island-condos.php
http://www.neilinnes.org/georgegarden.htm
http://www.beltoncommunities.com/westwingresidencesatetoncity.htm

http://english.cri.cn/3126/2006/09/03/961@134350.htm
http://www.thaifinbiz.com/sme_detail.php?tab=4&smes_id=3475
http://www.thaiwebsites.com/thailand-GDP.asp
http://www.thaifolk.com/doc/northen.htm
http://www.chiangraiprovince.com/guide/eng/33.htm
http://en.wikipedia.org/wiki/Chiang_Rai_Province
http://www.kkt.co.th/shop/k/kktemarket/img-lib/spd_20111217153032_b.jpg
http://c0.dmlimg.com/1fc1c1c2db5852e08ffc380475e26336d202d63a07c0c0dcbc876e4d4d7
a0cdb.jpg
http://www.108comstore.com/sites/default/files/imagecache/product_full/FAX-837MCS.jpg
http://www.jkscom.com/images/catalog_images/1304174271.jpg
http://www.goodchoiz.com/content/images/thumbs/0000746__mono_twc_1502_75f_.jpeg
http://www.thehirebusiness.com/images08/e029-mesh-swivel-office-chair.jpg
http://www.beautyandnails.com.au/images/scaled/shopitemzoom1299904157_NailCustomerChair.jpg
http://3.bp.blogspot.com/-4VpazPH2h9k/TwSS3PrASI/AAAAAAAAATY/hOgLvaKXlEM/s1600/cabinet.jpg
127

http://www.officesuppliesb2b.com/b2b/pics/Lever_Arch_File__PVC_Cover__Document_File.jpg
http://www.royaalinteriorfurniture.com/image/1250228809200905151127230.ConferenceTable-%20Chairs.jpg
http://cozyfurnitures.com/wp-content/uploads/2013/01/Minimalist-furniture-comfortablesofa-ciones-blog.jpg
http://www.gd-wholesale.com/userimg/21/3674i2/wall-split-type-air-conditioner-j-series418.jpg
http://www.yopi.co.th/image/prod_pics/1963/e/1963052.jpg
http://www.scandinaviancomfort.com/tv/tv12.jpg
http://media.treehugger.com/assets/images/2011/10/buygreen-bravespace-hollow-diningtable.jpg
http://media.yellowpages.co.th/yellowpages/products/th/2045712/9934048_006.jpg
http://www.in.all.biz/img/in/catalog/104797.jpeg
http://www.ilovemyshopping.com/th/upload/1334801887_01.jpg
http://adams50.realelibrary.com/_adams50/public_gallery/dinner-table.jpg
http://2.bp.blogspot.com/_IhbHlbFiggY/SaO4dPIxgI/AAAAAAAAACg/z9xLNi0J52w/s1600/refrigerator.jpg
http://www.abcsources.com/images/120610/china-wholesale-Stainless-Steel-Vacuum-Flask7443.jpeg
http://www.o-digital.com/uploads/2227/2291-1/Water_Dispenser_HSM_58LB_729.jpg
http://www.siam-shop.com/images/shop/1561
http://www.be2hand.com/upload/200911/200911-03-210719-3.jpg
http://www.clipmass.com/upload/news/13/12248_full.jpg
http://www.swanstreet.com.au/_uploaditems/_uploadimages/stock/lrg_1996_1_Basin%20My
ra.jpg
http://www.fpo.go.th/S-I/Source/ECO/ECO23.htm

128

Appendix
Logo of company

129

Project Feasibility Study and Evaluation (1203302)


Modern Empire Village

Present by
Miss Saowapa srikrairot

5131205071

Miss Kanokwan bunkhet

5131205086

Miss Thanisa kiddee

5131205128

Mr. Poom kosolsirisukkul 5131207092


Miss Nicharin kheunsakul 5231205053
Mr. Olanrat upalavong

5231205181

Mr. Sittikorn sroimori

5231207115

Miss Sawaros kimsee

5331205089

Tourism Management Section 2


Seat No. 4
Present toAj. Chaiyawat Thongintr
Semester 2/ 2012
Mae Fah Luang University

130

131

You might also like