PT.

JAYA KARYA PERDANA TARIF OF HEAVY DUTY EQUIPMENT & TRANSPORTATION PERIODE 2012
NO

EQUIPMENT

UNIT

DAY

OVERTIME

MONTHLY

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 21 22 23

450ton crawler tahun 2010 350ton Superlift thn 2010 250ton Clawler thn 2009 150ton Hydraulik Tadano 100ton Hd.T TerrainCrane 80ton mechanik T,Crane 70tonRough TeranoCrane 50RoughCraneTranoCrane 45tonHydraulik crane 35tonHydraulik crane 20tonHydraulik craneKato 10 Ton Forklift 5 Ton Forklift 3ton Forklift 80t Lowbed Traller 40t Lowbed Traller High Bed Traller Tronton th.2010 D.Truck index 22 th.2011 3ton Foco Unit Crane 50 ton Crawler th.2009 Tower Crane Penner Whell Loader Becho Loader TB.Tongkang 270 feet

76juta 54juta 25juta 20juta 14juta 10juta 8juta 4,5juta 4juta 3,5juta 1,8juta 2,9juta 1,3juta 800ribu 4,2juta 1,9juta 2juta 900ribu 420ribu 950ribu 4,7juta 4,7juta 1,7juta 2juta -

11juta 8,2juta 3,8juta 2,9juta 1,1juta 1juta 1juta 430ribu 365ribu 310ribu 220ribu 380ribu 240ribu 180ribu 640ribu 350ribu 300ribu 120ribu 575ribu 185ribu 820ribu 750ribu 290ribu 330ribu -

950juta 688juta 320juta 300juta 230juta 180juta 150juta 115juta 98juta 70juta 35juta 39juta 19juta 15juta 90juta 60juta 50juta 30juta 38juta 32juta 90juta 65juta 39juta 45juta Negotiable

Mobilization /Demobilization.
EQUIPMENT 250ton Cwarler Fushun QY 150ton Mechanic Truck Crane P&H 120ton Hydraulic Truck Crane Tadano 110ton Hydraulic Crane 100ton Hydraulic Crane 80ton Mechanic Truck Crane L/B 70ton Rought Terran Crane 50ton Rought Terran Crane 35ton Mechanic Truck Crane P&H 45ton Hydraulik Crane(KATO) 35ton Hydraulik Crane(KATO) 20ton Hydraulik Crane Crane Pancang Condition : (Fdield in Merak ,Cilegon).
1.Fuel Operator and Maintenance Shell be. 2.Lifting Accessaries,Securityshould be Arranged by hirers. 3.Daily Working Hour : 08.00 12.00 and 13.00 17.00 hours and 18.00 24.00 (Netto 8 hours) Off ours. 4.Minimum Charge 3 (Three) Days for 80 ton Crane up to 150 ton and 2 (Two) Week for 250 ton CWD Up. 5.No Special Charge is Applied on Sunday /Holiday Works sheet. 6.Emergency Order (After 3pm of one day before working days) is Added as Surcharge of 50%. 7.PPn Tax Shall be Charged in Accourdance with Governance Regulation on offering. 8.Cargo Insurance With Waiver of Sublogation Clause Shall be Procured by Hirer (Outside Tranportation Case) 9.Steel Plate Rp.120.000/Pcs/Shift.Concreete Block Rp.105.000/Ton/Shift.MobDemob as per Equipment Used

STANDART 15-30M 95juta 3juta 3,8juta 4,5juta 3,2juta 3,2juta 3,2juta 1,8juta 1,8juta 800Ribu 800Ribu 550Ribu 15juta 5,5juta 4,3juta 3,2juta -

30-43M 6juta 5,8juta 3,2juta -

OVER43M 7,5juta 5,8juta -

Jakarta, Januari 2012 PT.JAYA KARYA PERDANA

Toni Fatullah 087771169054.

Harga Sewa Alat Berat


No 1 2 3 4 5 6 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Excavator SK.300 Bulldozer D6 Bulldozer D8 Hydraulick Breaker Standar SK.200 Hydraulick Breaker SK.300 Vibro Roller Stoom Walze 6-8ton & 8-10ton Stoom Walze 10 ton 12 ton Motor Grader Shi Foot Truck Tronton tahun 2010 up.Flat Deck Dump Truck Indek 22 tahun 2011 up. Genset 80.KVA Travo Las 600 A Genset 120KVA Commetto 150 ton - 1500 ton Truck Mounted Hiap crane caps.10 ton Truck Mounted Hiap crane caps.5 ton Truck Mounted Hiap crane caps.3 ton Welding Rectifier Transformer 300 500A Welding Enggine Transformer 300 500 A Plasma Cutting Mechine Elec.Winc.Hoice.kapasitas 5 ton Compressor 175 CFM Mini Excavator 0,1 M3 Water Truck kapasitas 8000 liter Generator 25 KVA Generator 45 KVA Generator 250 KVA Uraian Excavator Standard SK.200 Kosong Rp.155.000,-/jam Rp.269.000,-/jam Rp.165.000,-/jam Rp.348.000,-/jam Rp.249.000,-/jam Rp.318.000,-/jam Rp.155.000,-/jam Rp.88.500,-/jam Rp.110.000,-/jam Rp.305.000,-/jam Rp.105.000,-/jam Rp.225.000,-/jam Rp.244.000,-/Jam Rp.296.000,-/Jam Rp.200.000,-/Hari Rp.320.000,-/Hari Negotiable Rp.2.500.000,-/Hari Rp.1600.000,-/Hari Rp.1.300.000,-/Hari Rp.100.000,-/Hari Rp.200.000,-/Hari Rp.225.000,-/Hari Rp.550.000,-/Hari Rp.476.000,-/Hari Rp.100.000,-/Jam Rp.1.200.000,-/Hari Rp.240.000,-/Hari Rp.450.000,-/Hari Rp.3.000.000,-/Hari All in Rp.340.000,-/Jam Rp.380.000,-/Jam Rp.390.000,-/Jam Rp.630.000,-/Jam Rp.550.000,-/Jam Rp.690.000,-/Jam Rp.450.000,-/Jam Rp.195.000,-/Jam Rp.240.000,-/Jam Rp.580.000,-/Jam Rp.350.000,-/Jam Rp.1.310.000,-/Hari Rp.1.500.000,-/Hari Rp.52.000.000,-/Bln Rp.4.000.000/Bulan Rp.71.000.000,-/Bln Negotiable Rp.54.000.000,-/Bln Rp.36.000.000,-/Bln Rp.29.000.000,-/Bln Rp.2.300.000,-/Bln Rp.4.500.000,-/Bln Rp.6.000.000,-/Bln Rp.13.000.000,-/Bln Rp.12.000.000,-/Bln Rp.16.000.000,-/Bln Rp.25.000.000,-/Bln Rp.5.000.000,-/Bln Rp.9.000.000,-/Bln Rp.70.000.000,-/Bln

Keterangan 1. 2. 3. 4. 5.

Syarat pemakaian sewa minimum 200 jam Pembayaran Cash dimuka Bahan Bakar Solar Industri Keamanan,Uang Makan dan Penginapan Operator di tanggung Penyewa Apabila terjadi Stand by (Alat tidak dapat beroperasi) karena kesalahan penyewa,maka dikenakan pembayaran 50% dari harga sewa perhari (8 Jam) 6. Apabila terjadi kerusakan alat, maka akan diganti dengan hari berikutnya 7. Alat tidak dapat beroperasi apabila penyewa belum menyelesaikan administrasi keuangan (pembayaran cash dimuka) 8. Over head 15% adalah biaya Mobilisasi,Oli,Pelumas dan Maintenance.

Toni Fatullah. 087771169054.