Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" FEEDER BAY 1 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST

Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" FEEDER BAY 2 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST

Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" FEEDER BAY 3 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST

Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" FEEDER BAY 4 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST

Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" FEEDER BAY 6 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST

Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" FEEDER BAY 11 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST ARDIYA "B" FEEDER BAY 12 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST

Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" Substation name 30 MVA TRANSFORMER 1 Panel number A10/750/25 Type TRANVILL-EIB-VBKM Manufacture BUDAPEST

: : : :

Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" LOCAL TRANSFORMER 1 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST ARDIYA "B" LOCAL TRANSFORMER 2 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST ARDIYA "B" 30 MVA TRANSFORMER 2 A10/750/25 TRANVILL-EIB-VBKM BUDAPEST ARDIYA "B" BUS SECTION A10/750/25 TRANVILL-EIB-VBKM BUDAPEST

Substation name Panel number Type Manufacture

: : : :

ARDIYA "B" FEEDER BAY 14 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST ARDIYA "B" FEEDER BAY 15 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST ARDIYA "B" FEEDER BAY 16 A10/500/8 TRANVILL-EIB-VBKM BUDAPEST ARDIYA "B" BUS COUPLER A10/750/25 TRANVILL-EIB-VBKM BUDAPEST

Substation name Panel number Type Manufacture

: : : :

Substation name Panel number Type Manufacture

: : : :

Substation name Panel number Type Manufacture

: : : :

Substation name Panel number Type Manufacture

: : : :

Substation name Panel number Type Manufacture

: : : :

Substation name Panel number Type Manufacture

: : : :

BATTERY TESTING CHECK LIST 1- BATTERY ISOLATING MCB OFF 2- BATTERY FUSE REMOVED 3- BATTEIES GROUP DISCONNECTED 4- VOLTAGE CHECK OF EACH BATTERY 5- CHECK NO SHORT FROM BATTERY TO EARTH 6- CHECK METAL BATTERY STANDS ARE EARTHED 7- USE VOLTMETER TO CHECK THE VOLTAGE OF EACH EVERY ONE HOUR 8- CHECK THE ROOM TEMPERATURE ONCE AND MEASURE THE TEMPERTURE IN BATTERY DURING DISCHARGE 9- MAKE ABSOLUTELY SURE THE POLARITY CORRECT BEFORE INTERCONNECT THE BATTERY BACK 10- CHECK TIGHTENESS FOR THE WIRES & CABLES FOR BOTH BATTERY AND CHARGER 12- CLEAN BATTERY WITH WATER 13- CHECK THE CONNECTING LINKS BETWEEN BATTERIES CLEAN AND TIGHT GOOD. CHARGER CHECK LIST 1- CLEAN THE CHARGER AFTER MAKE OFF (VACUUM & BLOWER ) 2- CHECK THE CHARGER WIRES TIGHTENESS AND CRIMPING OF ALL CONNECTION 3- CHECK THE CHARGER VOLTAGE UNDER TEST IN: . FLOAT MODE . CHARGE MODE . BOOST MODE AND ADJUST IF NEEDS 4- INSULATION TEST 5- CHARGER CUBICLES GROUND CONTINUITY 6- CHECK CHARGER STOP ALARM 7- TRPPING 8- DC FUSE TRIPPING 9- SIGNALLING TEST 10- REMOTE ALARM TEST 11- TEST INSTRUMENT CALIBRATION 12- ALARM FOR UNDERVOLTAGE AND OVERVOLTAGE 13- ALARM FOR EARTH FAULT 14- AFTER NORMALIZED CHECK THE LIMITATION CURRENT AND ADJUST IF NEED

SAFETY PRECAUTIONS 1 - USE ONLY INSULATED TOOLS 2 - STAND ON RUBBER MAT 3 - PERSONAL EFFECTS OF METAL SUCH AS RINGS,WATCHES AND NECKLACES WHICH MAY CAUSE A SHORT CIRCUIT AND METAL TOOLS WHICH MAY FALL FROM OPEN POCKETS SHOULD BE REMOVED 4 - MAKE AC SUPPLY OFF FOR CHARGER BEFORE START CLEAN 5 - ALWAYS USE EYE PROTECTION AND RUBBER GLOVES WHEN HANDLING CELLS, HANDLE CELLS WITH CARE, ENSURING THEY ARE KEPT UPRIGHT 6 - USE ONLY PROPER LIFTING TECHNIQUES 7 - DONT SMOKE 8 - DO NOT USE OPEN FLAMES 9 - AVIOD CREATING AN ARC OR SPARKS WHEN WORKING ON THIS EQUIPMENT 10- AVIOD WEARING CLOTHING WHICH IS SUSCEPTIBLE TO DISCHARGE OF STATIC ELECTRICITY 11- KEEP THE DANGER & INSTRUCTION PLATES CLEAR AND CORRECT PLACE ( WITH MEW & COMPANY ENG. ) DO NOT START WITHOUT THERE PERMISSION 12- AFTER WORK IS COMPLETE, REFIT ALL PROTECTIVE COVERS AND CLOSE AND LOCK ALL DOORS.

SAFETY PRECAUTION (FEEDER ) 1 - BEFORE START ANY WORKS PERMIT WORK CERTIFICATE PAPER SHOULD BE SIGNED FROM MEW & COMPANY ENG. 2 - DETERMINE THE BAY WHERE YOU WILL WORK BY USING WARNING TAPE , DANGER BOARD & CAUTION BOARD 3 - OPEN PILOT CABLE 4 - ISOLATE THE INTERTRIP CIRCUIT 6 - BEFORE START CLEANING AND TIGHTNESS, SWITCH OFF THE DC SUPPLY ( ARRANGE WITH GIS ENG. ) 7 - USE 500V DC MEGGER (INSULATION TESTER ) 8 - BEFORE REMOVE PROTECTION RELAYS CHECK : - TRIP CONTACT - CTs CIRCUIT - PILOT LOOP RESISTANCE - RELAY FLAG - RELAYS SETTING - MATCH CTs - DIRECTIONAL ELEMENT 9 - AFTER WORK REFIT ALL COVERS 10-CHECK ALL LAMPS AND SEMAPHORE POSITION 11-CHECK ALL CIRCUITS HEALTHY

300KV

132KV

11KV

SAFETY PRECAUTION (BUS COUPLER ) 1 - BEFORE START ANY WORKS PERMIT WORK CERTIFICATE PAPER SHOULD BE SIGNED FROM MEW & COMPANY ENG. 2 - DETERMINE THE BAY WHERE YOU WILL WORK BY USING WARNING TAPE , DANGER BOARD & CAUTION BOARD 5 - USE SUITABLE AND ISOLATED TOOLS 6 - BEFORE START CLEANING AND TIGHTNESS SWITCH OFF THE DC SUPPLY ( ARRANGE WITH GIS ENG. ) 7 - USE 500V DC MEGGER (INSULATION TESTER ) 8 - BEFORE REMOVE PROTECTION RELAYS CHECK : - TRIP CONTACT - CTs CIRCUIT - RELAY FLAG - RELAYS SETTING - MATCH CTs 9 - AFTER WORK REFIT ALL COVERS 10-CHECK ALL INDICATION BULBS AND SEMAPHORE POSITION 11-CHECK ALL CIRCUITS HEALTHY

300KV

132KV

11KV