DATOS DE LA ESTRUCTURA
PREDIMENSIONAMIENTO
LOSA ALIGERADA
h=L/25
Donde "L" es la luz libre de viguetas
L(m)=
=====>
5.00
h(m)=
0.20
PREDIMENSIONAMIENTO
VIGAS
Siendo las recomendaciones del ACI, usaremos la siguientes formulas:
h=L/12 - L/10
L(m)=
5.00
h(m)=
0.42
0.50
Usaremos:
h(m)=
0.50
b=1/2*h - 2/3*h
h(m)=
0.50
b(m)=
0.25
0.33
0.50
Usaremos:
b(m)=
0.40
0.35
Por lo tanto usaremos vigas con la misma seccin 0.40 x 0.50 m. para todos los pisos
con excepcin al 4to piso donde sern de 0.40 x 0.40 m.
PREDIMENSIONAMIENTO
COLUMNA
TIPO 1 : lado = H/8
TIPO 2 : lado = H/10
TIPO 3 : lado = H/9
Donde: H = altura del piso
H(m)=
lado(m)=
3.30
0.4125
rea fluctuante(cm2)=
=====>
lado(m)=
0.50
2500
0.50 m.
peralte(m)=
0.50
0.50 m.
0.28
T/m2
5.29
m2
4.00
Viga T.
2.40
T/m3
4.50
0.40
0.40
Viga L.
2.40
T/m3
4.50
0.40
Columna
2.40
T/m3
3.30
0.50
CV
Sobrecarga
5.92
m =
1.73
0.40
m =
1.73
0.50
m =
1.98
11.36
2.50
6.35
Azotea
0.10
T/m2
5.00
5.00
.=
13.86T
3er y 2do Piso
CM
Losa
0.30
T/m2
5.29
4.00
Viga T.
2.40
T/m3
4.50
0.40
0.50
m =
2.16
Viga L.
2.40
T/m3
4.50
0.40
0.50
m =
2.16
Columna
2.40
T/m3
3.30
0.50
0.50
m =
1.98
12.65
5.00
CV
Sobrecarga
Vivienda
0.20
T/m2
5.00
5.00
17.65T
.=
0.35
T/m2
5.29
4.00
7.40
Viga T.
2.40
T/m3
4.50
0.40
0.50
m =
2.16
Viga L.
2.40
T/m3
4.50
0.40
0.50
m =
2.16
Columna
2.40
T/m3
4.30
0.50
0.50
m =
2.58
14.30
5.00
.=
Vivienda
CV
Sobrecarga
0.20
T/m2
5.00
5.00
19.30T
P. Total de Servicio =
rea de columna(cm2) =
======>
724.34
68.4505T
724.34
<
2400.00
cm2
ok!!!
PREDIMENSIONAMIENTO DE ZAPATAS
PLANO DE LAS REAS TRIBUTARIAS
PREDIMENSIONAMIENTO DE ZAPATAS
METRADO DE CARGA PARA CADA ZAPATA
Z -1
4to Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
0.28
2.40
2.40
2.40
Azotea
0.10
T/m2
T/m3
T/m3
T/m3
5.51
2.25
2.25
3.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
T/m2
2.75
2.75
0.40
0.40
0.50
m =
m =
m =
.=
1.54
0.86
0.86
1.98
T
T
T
T
0.76
6.01
1.65
1.08
1.08
1.98
T
T
T
T
1.51
7.31
1.65
1.08
1.08
2.58
T
T
T
T
1.51
7.91
0.30
2.40
2.40
2.40
Vivienda
0.20
T/m2
T/m3
T/m3
T/m3
5.51
2.25
2.25
3.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
T/m2
2.75
2.75
0.50
0.50
0.50
m =
m =
m =
.=
1er Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
P ( Servicio) Z-1
0.30
2.40
2.40
2.40
T/m2
T/m3
T/m3
T/m3
5.51
2.25
2.25
4.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
Vivienda
0.20
T/m2
2.75
2.75
28.53T
0.50
0.50
0.50
m =
m =
m =
.=
PREDIMENSIONAMIENTO DE ZAPATAS
METRADO DE CARGA PARA CADA ZAPATA
Z -2
4to Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
0.28
2.40
2.40
2.40
Azotea
0.10
T/m2
T/m3
T/m3
T/m3
10.80
4.50
2.25
3.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
T/m2
5.00
2.75
0.40
0.40
0.50
m =
m =
m =
.=
3.02
1.73
0.86
1.98
T
T
T
T
1.38
8.97
3.24
2.16
1.08
1.98
T
T
T
T
2.75
11.21
3.24
2.16
1.08
2.58
T
T
T
T
2.75
11.81
0.30
2.40
2.40
2.40
Vivienda
0.20
T/m2
T/m3
T/m3
T/m3
10.80
4.50
2.25
3.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
T/m2
5.00
2.75
0.50
0.50
0.50
m =
m =
m =
.=
1er Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
P ( Servicio) Z-2
0.30
2.40
2.40
2.40
Vivienda
0.20
=
T/m2
T/m3
T/m3
T/m3
10.80
4.50
2.25
4.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
T/m2
5.00
2.75
43.20T
0.50
0.50
0.50
m =
m =
m =
.=
PREDIMENSIONAMIENTO DE ZAPATAS
METRADO DE CARGA PARA CADA ZAPATA
Z -3
4to Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
0.28
2.40
2.40
2.40
Azotea
0.10
T/m2
T/m3
T/m3
T/m3
5.29
4.50
4.50
3.30
m2
m
m
m
4.00
0.40
0.40
0.50
m
m
m
T/m2
5.00
5.00
0.40
0.40
0.50
m =
m =
m =
.=
5.92
1.73
1.73
1.98
T
T
T
T
2.50
13.86
6.35
2.16
2.16
1.98
T
T
T
T
5.00
17.65
6.35
2.16
2.16
2.58
T
T
T
T
5.00
18.25
0.30
2.40
2.40
2.40
Vivienda
0.20
T/m2
T/m3
T/m3
T/m3
5.29
4.50
4.50
3.30
m2
m
m
m
4.00
0.40
0.40
0.50
m
m
m
T/m2
5.00
5.00
0.50
0.50
0.50
m =
m =
m =
.=
1er Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
P ( Servicio) Z-3
0.30
2.40
2.40
2.40
Vivienda
0.20
=
T/m2
T/m3
T/m3
T/m3
5.29
4.50
4.50
4.30
m2
m
m
m
4.00
0.40
0.40
0.50
m
m
m
T/m2
5.00
5.00
67.39T
0.50
0.50
0.50
m =
m =
m =
.=
PREDIMENSIONAMIENTO DE ZAPATAS
METRADO DE CARGA PARA CADA ZAPATA
Z -4
4to Piso
CM
Losa
0.28
T/m2
10.80
m2
Viga T.
2.40
T/m3
2.25
0.40
0.40
Viga L.
2.40
T/m3
4.50
0.40
0.40
Columna
2.40
T/m3
3.30
0.50
0.50
T/m2
2.75
5.00
3.02
m =
0.86
m =
1.73
m =
1.98
1.38
Azotea
CV
Sobrecarga
0.10
.=
8.97
2do y 3er Piso
CM
Losa
0.30
T/m2
10.80
m2
3.24
Viga T.
2.40
T/m3
2.25
0.40
0.50
m =
1.08
Viga L.
2.40
T/m3
4.50
0.40
0.50
m =
2.16
Columna
2.40
T/m3
3.30
0.50
0.50
m =
1.98
T/m2
2.75
5.00
2.75
CV
Vivienda
Sobrecarga
0.20
.=
11.21
1er Piso
CM
Losa
0.30
T/m2
10.80
m2
3.24
Viga T.
2.40
T/m3
2.25
0.40
0.50
m =
1.08
Viga L.
2.40
T/m3
4.50
0.40
0.50
m =
2.16
2.40
T/m3
4.30
0.50
0.50
m =
2.58
T/m2
2.75
5.00
2.75
Columna
CV
Vivienda
Sobrecarga
0.20
.=
11.81
P ( Servicio) Z-4
43.20T
PREDIMENSIONAMIENTO DE ZAPATAS
CARGAS TOTALES
CARGAS TOTALES
Z-1
Z-2
Z-3
Z-4
=
=
=
=
28.53
43.20
67.39
43.20
T
x
4
.=
T
x
4
.=
T
x
4
.=
T
x
4
.=
PESO TOTAL DEL EDIFICIO
114.11
172.80
269.57
172.80
729.29
T
T
T
T
T
Gt = 2.5 kg/cm2
REA DE ZAPATAS
AREA DE CADA ZAPATA
A1 =
1.07*28.53 . =
1.22
m2
A=B=
1.10 m
1.10m
1.85
m2
B=2A
Ax2A=2(A2)=
0.96 m
1.00m
1.70 m
1.70m
0.96 m
1.00m
25
A2 =
1.07*43.20 . =
25
A3 =
1.07*67.39 . =
2.88
m2
A=B=
1.85
m2
B=2A
25
A4 =
1.07*43.2
25
.=
Ax2A=2(A2)=
PREDIMENSIONAMIENTO DE ZAPATAS
CALCULO DE PERALTE DE LA ZAPATA POR PUNZONAMIENTO
Z-1
PD(T)=
PL(T)=
23.23
5.29
PU(T)=
41.53
PD(T)=
PL(T)=
33.58
9.63
PU(T)=
63.37
PD(T)=
PL(T)=
49.89
17.50
PU(T)=
99.60
PD(T)=
PL(T)=
33.58
9.63
PU(T)=
63.37
Z-2
Z-3
Z-4
PREDIMENSIONAMIENTO DE ZAPATAS
CALCULO DE PERALTE DE LA ZAPATA POR PUNZONAMIENTO
METRADO DE CARGAS
4to Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
0.28
2.4
2.4
2.4
T/m2
T/m3
T/m3
T/m3
193.08
4.50
4.50
3.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
0.40
0.40
0.50
Azotea
0.1
T/m2
15.50
15.50
m =
24.03
m
m
m
.=
12
12
16
.=
.=
.=
.=
54.06
20.74
20.74
31.68
127.21
T
T
T
T
T
E -30
0.25
.=
6.01
12
12
16
.=
.=
.=
.=
57.92
20.74
20.74
31.68
131.08
T
T
T
T
T
E -30
0.25
.=
12.01
12
12
16
.=
.=
.=
.=
57.92
20.74
20.74
41.28
140.68
T
T
T
T
T
E -30
0.25
.=
12.01
133.22T
2do y 3er Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
0.3
2.4
2.4
2.4
T/m2
T/m3
T/m3
T/m3
193.08
4.50
4.50
3.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
0.40
0.40
0.50
Vivienda
0.2
T/m2
15.50
15.50
m =
48.05
m
m
m
.=
143.09T
1er Piso
CM
Losa
Viga T.
Viga L.
Columna
CV
Sobrecarga
0.3
2.4
2.4
2.4
T/m2
T/m3
T/m3
T/m3
193.08
4.50
4.50
4.30
m2
m
m
m
0.40
0.40
0.50
m
m
m
0.40
0.40
0.50
Vivienda
0.2
T/m2
15.50
15.50
m =
48.05
152.69T
572.09T
m
m
m
.=
mts.
mts.
mts
mts
Valores
Descripcin
Z=
0.4
Zona 3
U=
C=
2.5
S=
1.2
Suelo Intermedio
R=
Sistema Aporticado
P=
572.09
Peso Total
V=
85.81T
Pi hi
Z Pi hi
VY
PISO 1
152.69
3.3
503.87
4623.34
85.81
9.352
PISO 2
143.09
6.6
944.38
4623.34
85.81
17.529
PISO 3
143.09
9.9
1416.58
4623.34
85.81
26.293
PISO 4
133.22
13.2
1758.51
4623.34
85.81
32.639
85.813
32.639
26.293
17.529
9.352
PISO 4
PISO 3
PISO 2
PISO 1
COMBOSISMOX
COMBOSISMOY
PISO 4
90.83
90.83
0.004
CUMPLE
0.004
CUMPLE
PISO 3
76.83
76.83
0.006
CUMPLE
0.006
CUMPLE
PISO 2
56.91
56.91
0.008
NO CUMPLE
0.008
NO CUMPLE
PISO 1
31.75
31.75
0.007
CUMPLE
0.007
CUMPLE
KZ=CZ x AZ
KZ=6000x(1.7*1.7)
KZ=
17340
EN "X"
< o = 0.007
EN "Y"
PISO 4
PISO 3
PISO 2
PISO 1
A1(m2)=
A2(m2)=
1.21
2.00
K1=
K2=
7260.0
12000.0
A3(m2)=
A4(m2)=
2.89
2.00
K3=
K4=
17340.0
12000.0
ANLISIS COMUN
VS
Comn
( sismo X +)
Comn
( sismo Y +)
Balasto
( sismo X +)
Balasto
( sismo Y +)
Balasto-Real
( sismo X +)
Balasto-Real
( sismo Y +)
Xmx (edificio)
84.49mm
90.83mm
95.89mm
Ymx (edificio)
84.49mm
90.83mm
95.89mm
Zmx (cimiento)
-3.98mm
-3.98mm
-8.18mm
-8.18mm
Nmx
12.62T
12.62T
11.77T
11.77T
12.68T
12.68T
Vmx
6.83T
6.83T
6.97T
6.97T
6.94T
6.94T
Mmx
15.85T-m
15.85T-m
16.13T-m
16.13T-m
16.29T-m
16.29T-m
EN "X"
EN "Y"
EN "Y"
EN "X"
EN "Y"
4to NIVEL
0.004
0.004
0.004
0.004
0.005
0.005
3er NIVEL
0.006
0.006
0.006
0.006
0.006
0.006
2do NIVEL
0.007
0.007
0.008
0.008
0.008
0.008
1er NIVEL
0.007
0.007
0.007
0.007
0.008
0.008
CONCLUSIONES
La diferencia entre el modelo normativo esttico (Comn) y los modelos con
Balasto es de aumento de desplazamientos y disminucin de fuerzas, lo cual se
cumpli.
APLICACIN DE INNOVACIONES
CONSIDERACIONES DE REPLANTEO
Datos de la Estructura
Predimensionamiento
Losa Aligerada
Vigas
Muro Portante
h(m)=
t(m)=
=====>
3.30
0.165
t(m)=
0.25
CONSIDERACIONES DE REPLANTEO
Placa
=====>
e(m)=
Columna
Comprobacin Segn ACI
0.20
CONSIDERACIONES DE REPLANTEO
Predimensionamiento de Zapatas
Plano de reas Tributarias
CONSIDERACIONES DE REPLANTEO
Z2
4to Piso
CM
Losa
Viga T.
Viga L.
Placa
Columna
CV
Sobrecarga
0.28
2.40
2.40
2.40
2.40
Azotea
0.10
T/m2
T/m3
T/m3
T/m4
T/m3
11.25
2.25
2.25
2.25
3.30
m2
m
m
m
m
0.40
0.40
0.20
0.50
m
m
m
m
T/m2
5.00
2.75
0.40
0.40
3.30
0.50
m
m
m
m
=
=
=
=
.=
3.15
0.86
0.86
3.56
1.98
T
T
T
T
T
1.38
11.80
3.38
1.08
1.08
3.56
1.98
T
T
T
T
T
2.75
13.83
3.38
1.08
1.08
4.64
2.58
T
T
T
T
T
T
0.30
2.40
2.40
2.40
2.40
Vivienda
0.20
T/m2
T/m3
T/m3
T/m4
T/m3
11.25
2.25
2.25
2.25
3.30
m2
m
m
m
m
0.40
0.40
0.20
0.50
m
m
m
m
T/m2
5.00
2.75
0.50
0.50
3.30
0.50
m
m
m
m
=
=
=
=
.=
1er Piso
CM
Losa
Viga T.
Viga L.
Placa
Columna
CV
Sobrecarga
P ( Servicio) Z-2
Z3
0.30
2.40
2.40
2.40
2.40
Vivienda
0.20
=
T/m2
T/m3
T/m3
T/m3
T/m3
11.25
2.25
2.25
2.25
4.30
m2
m
m
m
m
0.40
0.40
0.20
0.50
m
m
m
m
T/m2
5.00
2.75
54.96 T
0.50
0.50
4.30
0.50
m
m
m
m
=
=
=
=
.=
2.75
15.51
CONSIDERACIONES DE REPLANTEO
Z4
4to Piso
CM
Losa
Viga T.
Viga L.
Muro
Columna
CV
Sobrecarga
0.28
2.40
2.40
1.80
2.40
T/m2
T/m3
T/m3
T/m3
T/m3
10.80
2.25
4.50
0.25
3.30
m2
m
m
m
m
0.40
0.40
2.25
0.50
m
m
m
m
Azotea
0.10
T/m2
2.75
5.00
0.40
0.40
2.80
0.50
m
m
m
m
=
=
=
=
.=
3.02
0.86
1.73
2.84
1.98
T
T
T
T
T
1.38
11.81
3.24
1.08
2.16
2.84
1.98
T
T
T
T
T
2.75
14.05
3.24
1.08
2.16
2.99
2.58
T
T
T
T
T
2.75
14.80
0.30
2.40
2.40
1.80
2.40
T/m2
T/m3
T/m3
T/m3
T/m3
10.80
2.25
4.50
0.25
3.30
m2
m
m
m
m
0.40
0.40
2.25
0.50
m
m
m
m
Vivienda
0.20
T/m2
2.75
5.00
0.50
0.50
2.80
0.50
m
m
m
m
=
=
=
=
.=
1er Piso
CM
Losa
Viga T.
Viga L.
MURO
Columna
CV
Sobrecarga
P ( Servicio) Z-4
0.30
2.40
2.40
1.80
2.40
T/m2
T/m3
T/m3
T/m3
T/m3
10.80
2.25
4.50
0.25
4.30
m2
m
m
m
m
0.40
0.40
2.25
0.50
m
m
m
m
Vivienda
0.20
T/m2
2.75
5.00
54.69 T
0.50
0.50
2.95
0.50
m
m
m
m
=
=
=
=
.=
CONSIDERACIONES DE REPLANTEO
Calculo de Peralte de Zapata
Diseo de Zapata Combinada
Pe-(Z-2)
PD(T)=
PL(T)=
PeT(T)=
45.34
9.63
54.96
L(m)=
t(m)=
5.00
0.50
=====>
Gt=
Pz=
Az(m)=
Pi-(Z-3)
PD(T)=
PL(T)=
PiT(T)=
Lo(m)=
Lo(m)=
B(m)=
B(m)=
45.07
9.63
54.69
L(m)=
t(m)=
5.00
0.50
6.01
6.10
2.50 kg/cm2
9% (Pi + Pe)
5.33
=====>
49.89
17.50
67.39
Pe(Z-4)
PD(T)=
PL(T)=
PeT(T)=
=====>
Gt=
Pz=
Az(m)=
0.87
1.00
Pi-(Z-3)
PD(T)=
PL(T)=
PiT(T)=
Lo(m)=
Lo(m)=
6.02
6.10
2.50 kg/cm2
9% (Pi + Pe)
5.32
=====>
B(m)=
B(m)=
0.87
1.00
49.89
17.50
67.39
CONSIDERACIONES DE REPLANTEO
Metrado de Cargas
4to Piso
CM
Losa
Viga T.
Viga L.
Placa
Muro
Columna
CV
Sobrecarga
0.28
2.4
2.4
2.40
1.80
2.4
T/m2
T/m3
T/m3
T/m3
T/m3
T/m3
194.88
4.50
4.50
0.20
0.25
3.30
m2
m
m
m
m
m
0.40
0.40
4.50
4.50
0.50
m
m
m
m
m
0.40
0.40
3.30
2.80
0.50
Azotea
0.1
T/m2
15.50
15.50
m =
24.03
m
m
m
m
m
.=
10
12
2
2
16
.=
.=
.=
.=
.=
.=
54.57
17.28
20.74
14.26
11.34
31.68
149.86
T
T
T
T
T
T
T
E -30
0.25
.=
6.01
12
12
2
2
16
.=
.=
.=
.=
.=
.=
58.46
20.74
20.74
14.26
11.34
31.68
157.21
T
T
T
T
T
T
T
E -30
0.25
.=
12.01
12
12
2
2
16
.=
.=
.=
.=
.=
.=
58.46
20.74
20.74
18.58
11.95
41.28
171.74
T
T
T
T
T
T
T
E -30
0.25
.=
12.01
155.86T
2do y 3er Piso
CM
Losa
Viga T.
Viga L.
Placa
Muro
Columna
CV
Sobrecarga
0.3
2.4
2.4
2.40
1.80
2.4
T/m2
T/m3
T/m3
T/m3
T/m3
T/m3
194.88
4.50
4.50
0.20
0.25
3.30
m2
m
m
m
m
m
0.40
0.40
4.50
4.50
0.50
m
m
m
m
m
0.40
0.40
3.30
2.80
0.50
Vivienda
0.2
T/m2
15.50
15.50
m =
48.05
m
m
m
m
m
.=
169.22T
1er Piso
CM
Losa
Viga T.
Viga L.
Placa
Muro
Columna
CV
Sobrecarga
0.3
2.4
2.4
2.40
1.80
2.4
T/m2
T/m3
T/m3
T/m3
T/m3
T/m3
194.88
4.50
4.50
0.20
0.25
4.30
m2
m
m
m
m
m
0.40
0.40
4.50
4.50
0.50
m
m
m
m
m
0.40
0.40
4.30
2.95
0.50
Vivienda
0.2
T/m2
15.50
15.50
m =
48.05
183.75T
678.07T
m
m
m
m
m
.=
CONSIDERACIONES DE REPLANTEO
Ubicacin del Centro de Masa
Calculo de Cortante Basal
Parmetros
Valores
Descripcin
Z=
0.4
Zona 3
U=
C=
2.5
S=
1.2
Suelo Intermedio
R=
Sistema Dual
P=
678.07
Peso Total
V=
116.24
CONSIDERACIONES DE REPLANTEO
Distribucin de Fuerza Ssmica
DISTRIBUCION DE LA FUERZA SISMICA POR LA ALTURA
PESO
Pi hi
Z Pi hi
VY
PISO 1
183.75
3.3
606.38
5456.00
116.24
12.919
PISO 2
169.22
6.6
1116.88
5456.00
116.24
23.795
PISO 3
169.22
9.9
1675.32
5456.00
116.24
35.693
PISO 4
155.86
13.2
2057.41
5456.00
116.24
43.833
116.240
43.833
35.693
23.795
12.919
COMBOSISMOX
COMBOSISMOY
PISO 4
77.13
81.07
0.0052 CUMPLE
0.005
CUMPLE
PISO 3
60.11
64.59
0.0053 CUMPLE
0.006
CUMPLE
PISO 2
42.58
46.26
0.005
CUMPLE
0.006
CUMPLE
PISO 1
24.71
26.58
0.006
CUMPLE
0.006
CUMPLE
A1(m2)=
A3(m2)=
1.21
2.89
K1=
K3=
7260.0
17340.0
EN "X"
< o = 0.007
EN "Y"
PISO 4
PISO 3
PISO 2
PISO 1
VS
Balasto
( sismo X +)
Balasto
( sismo Y +)
Platea
( sismo X +)
Platea
( sismo Y +)
Xmx (edificio)
77.13mm
50.22mm
Ymx (edificio)
81.07mm
57.38mm
Zmx (cimiento)
-10.75mm
-10.57mm
-4.66mm
-4.81mm
Nmx
19.16T
14.87T
32.37T
28.29T
Vmx
5.25T
5.07T
9.47T
5.86T
Mmx
12.79T-m
12.61T-m
10.49T-m
8.71T-m
EN "X"
EN "Y"
EN "Y"
4to NIVEL
0.0052
0.005
0.0034
0.004
3er NIVEL
0.0053
0.006
0.004
0.004
2do NIVEL
0.005
0.006
0.004
0.004
1er NIVEL
0.006
0.006
0.004
0.004
CONCLUSIONES
Finalmente, se opt por disear una cimentacin ms acorde a una edificacin,
zapatas combinadas vs una platea de cimentacin, con lo cual, se lleg a transmitir de
una mejor manera los esfuerzos con ayuda de la forma amortiguada del suelo, con lo
cual a su vez, se redujeron los desplazamientos y cumplieron satisfactoriamente.