U2000 Local Craft Terminal (LCT) Installation and Administrations Guide Prerequisites:

To be able to install this application administration will have to have basic knowledge of Huawei PTN product range and need a computer with the following specifications: Windows XP installation 4.6 GB hard disk space o o o 1.1 GB software package (Zipped) 1.8 GB software package (unzipped) 1.68 GB of installed software

Minimum 2 GB of RAM U2000 LCT Installation package

U2000 LCT Installation.


Below are the installation steps. 1. Obtain a copy of U2000 LCT software (filename should be similar to: U2000LCTV100R002C01CP0302_win32_x86.zip) 2. Unpack or Unzip the program to a directory 3. Start Install.bat within the unzipped directory of U2000 LCT installation package.

4. Choose I accept the term and agreement then click next

5. Choose the language package, then click Next

6. Choose the software installation package you wished to install : a. Common Component / Base component are mandatory for the installations b. PTN Network Element Management is needed for Huawei PTN product series c. NA WDM Network Element Management is needed for Huawei WDM product series. Then click Next

7. Choose the U2000 LCT installation directory, then click on Next

8. Check on the installation packages and then click on Next

9. Choose Default Style and then click on Next

10.Fill in the database directory, If there are no database application available, U2000 will automatically install MSSQL software included in the software package. If there are no changes, just click on Next

11.Check on the configurations parameter and then click on Next

12.Then the installation process will start. This process will take about 30 minutes. Click on Next when done.