JOB SAFETY ANALYSIS FOR

EARTHWORKS IN EXCAVATION, CUTTING, BACKFILLING AND FILLING

Common Cooling Seawater System Phase 2


SQENCE OF BASIC ACTIVITY STEPS 1.0 Cutting POTENTIAL HAZARDS 1.1 Personal Injury HAZARDS CONTROL 1.1.1 All persons shall be safety inducted and all persons shall wear PPE. and tool box talk will be conducted daily before starting the job 1.2.1 Diverson Signal will be displayed Banksman will give signal to operator All Banksman shall wear reflecting vest. 1.3.1 Excavator must be equiped with swing/reverse alarms 1.4.1 Sufficient quantity of drinking water should be available with personel 1.1.1 During offloading of filling material persons shall wear dust mask 3.1.1 All persons shall wear ear muf 4.1.1 Excavated area shall be barricated by Crash Barrier and Deep Excavation Board will be displayed 4.1.2 Excavated soil be stored away from the edge of excavation at least 1.5 mts 4.1.3 Adequate access and egress must be maintained by means of access ladder with handrail in every 25 ft lateral distance 4.2.1 Excavator must be equipped with swing/reverse 4.2.2 Proper Access and Egress shall be Provided. 4.2.3 Effective dust supervision measures. 4.2.4 Trained operators for all the job activities. 4.3.1 Excavated materials shall be dump far away from pit 5.1.1 Mobile tent will provided 5.2.1 Mobile ablution will be provided RESPONSIBLE Dodsal Site supervisor

1.2 Accident

Dodsal Site supervisor

1.3 Movement of Machine 1.4 Dehydration due to heat 2.1 Dust Allergy 3.1 Noise 4.1 Deep Fall

Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor

2.0 Filling 3.0 Compaction 4.0 Excavation

Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor Dodsal Site supervisor

4.2 Excavator Movement / Swing

4.3 Excavated Materials 5.0 Heat stress 5.1 Sun Burn 5.2 Enviorment Polution

Remarks: 1- Prior to start any work it will be made sure that personnel are safety inducted. 2- Prior to start any work Tool Box Talk will be crried out. 3- Personnel will wear applicable PPE. 4- Adequate First Aid facility will be provided. 5- Continuous supervision must be provided where excavation is in progress. Prepred By - M. P. Gupta ( Civil Engineer )

Revewed By - Solayappan ( Safety Officer )