Insulation work of ESP with


1050.00
100 mm L.R.B. & 22 SWG
plain Alluminium Sheet

CLAIMED
QTY. M2

THIS BILL
QTY. M2

DIFF./HOLD
M2

AMOUNT
CLAIMED (Rs.)

THIS BILL
AMOUNT (Rs.)

DIFF./HOLD
(Rs.)

364.660

364.660

0.00

382893.00

382893.00

0.00

Insulation work of RABH


2 with 100 mm L.R.B. & 22
SWG plain Alluminium
Sheet

1050.00

792.625

0.000

792.63

0.00

0.00

0.00

Insulation work ofDown


3 Comer Duct Line with 100
mm L.R.B. & 22 SWG plain
Alluminium Sheet

1050.00

736.960

736.960

0.00

773808.00

773808.00

0.00

4 Insulation work of ESP with 825.00

348.360

348.360

0.00

287397.00

287397.00

0.00

ABOVE SUM

2242.605

1449.98

792.625

1444098.00

1444098.00

0.00

50 mm L.R.B. & 22 SWG


plain Alluminium Sheet

Net Payable Amount -- Rs. Fourteen Lac Fourty Four Thousand Ninety Eight Only

REMARKS

Hold

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
DATE : 09.02.2012
CONTRACTORDESCRIPTIONSL.
NO.

M/S. I K M INDUSTRIES PVT. LTD.


R.A. BILL-11

DESCRIPTION
RABH Erection Work RA

UNIT

RATE (Rs.) CLAIMED THIS BILL


/ MT
QTY.
QTY.

DIFF.

AMOUNT
CLAIMED (Rs.)

THIS BILL
AMOUNT (Rs.)

DIFF.
(Rs.)

MT

10000.00

12.397

12.397

0.00

123965.00

123965.00

0.00

MT

10000.00

8.301

8.301

0.00

83010.00

83010.00

0.00

NOS.

420.00

1344.0

1344.0

0.00

564480.00

564480.00

0.00

MT

10750.00

14.142

14.142

0.00

153117.00

152026.50

1090.50

5 09 Hold 20 % Amount

MT

10750.00

4.355

4.355

0.00

46816.00

46816.00

0.00

6 ESP Cooler Erection Work

MT

10750.00

48.484

48.484

0.00

521203.00

521203.00

0.00

1431.7

1431.7

0.000

1492591.00

1491500.50

1090.50

1 Bill -08 Hold 20% Amount


RABH Erection Work RA

2 Bill -10 Hold 30% Amount


RABH Erection

3 Work(Thimble) RA Bill -10

REMARKS

Hold 40% Amount


ESP Cooler Work RA Bill -

4 08 Hold 20 % Amount

ESP Cooler Work RA Bill -

ABOVE SUM

Net Payable Amount -- Rs. Fourteen Lac Ninety One Thousand Five Hundred and Fifty Paisa Only

Calculaton
Error

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
DATE : 29.02.2012

SL.
NO.

CONTRACTOR-

M/S. I K M INDUSTRIES PVT. LTD.

DESCRIPTION-

R.A. BILL-12

DESCRIPTION

UNIT

RATE
(Rs.)/UNIT

CLAIMED
QTY.

THIS BILL
QTY.

DIFF.

AMOUNT
CLAIMED (Rs.)

THIS BILL
AMOUNT (Rs.)

DIFF.
(Rs.)

RABH Erection Work


( Bag Fixing )

Nos.

420.00

3360.00

3360.00

0.00

1411200.00

1411200.00

0.00

RABH Erection Work


( Compressor Line )

MTR

80.00

142.80

142.80

0.00

11424.00

11424.00

0.00

3502.8

3502.8

0.000

1422624.00

1422624.00

0.00

ABOVE SUM

REMARKS

Rate in
MTR/Inch.

note:- As per Mech. Dept. Payable Amount is 80% of This Bill Amount- Rs. 1422624.00/- ( i.e. 80% Hold )
Net Payable Amount = Rs.

1138099.20

In Words- Rs. Eleven Lac Thirty Eight Thousands Ninety Nine & Twenty Paisa Only

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
DATE : 26.04.2012

SL.
NO.

CONTRACTOR-

M/S. I K M INDUSTRIES PVT. LTD.

DESCRIPTION-

R.A. BILL-13 ( R.A.B.H.- Bag Erection & Fixing Work )

DESCRIPTION

RATE
(Rs.)/UNIT

CLAIMED QTY.

THIS BILL
QTY.

DIFF.

AMOUNT
CLAIMED (Rs.)

THIS BILL
AMOUNT (Rs.)

DIFF.
(Rs.)

420.00

NA

NA

NA

284525.00

284525.00

0.00

RABH Erection Work


( Bag Fixing )
-- R.A.-12 Hold 20% Amount

R.A.-10 Hold Due to HR

..

..

..

..

50000.00

0.00

50000.00

R.A.-11 Hold Due to HR

..

..

..

..

50000.00

0.00

50000.00

R.A.-12 Hold Due to HR

..

..

..

..

50000.00

0.00

50000.00

0.000

434525.00

284525.00

150000.00

ABOVE SUM

NET PAYABLE AMOUNT = Rs.

REMARKS

To be cleared by
HR-Dept.

284525.00

In Words- Rs. Two Lac Eighty Four Thousand Five Hundred Twenty Five Only

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
DATE : 07.05.2012

CONTRACTOR- M/S. I K M INDUSTRIES PVT. LTD.


DESCRIPTION- RABH FINAL MEASUREMENT FOR THERMAL INSULATION WORK
( BILL FOR TOTAL THERMAL INSULATION QUANTITY )
SL.

DESCRIPTION

NO.

1
2
3

RABH Body
RABH Hopper 1 & 2 Sides

RATE

TOTAL QTY.

CHECKED

DIFF.

AMOUNT

CHECKED

DIFF./EXCESS

(Rs.)/M2

M2

QTY. M2

M2

CLAIMED (Rs.)

AMOUNT (Rs.)

(Rs.)

1050.00

1157.00

1113.96

43.04

1214850.00

1169658.00

45192.00

1050.00

1251.00

1050.00

1402.00

2222.50

430.50

2333625.00

452025.00

1313550.00
1472100.00

RABH Duct

1050.00

74.48

74.48

0.00

78204.00

78204.00

0.00

RABH Duct

1050.00

117.60

117.60

0.00

123480.00

123480.00

0.00

RABH Duct Reducer

1050.00

408.66

408.66

0.00

429093.00

429093.00

0.00

RABH Duct Reducer

1050.00

378.56

378.56

0.00

397488.00

397488.00

0.00

RABH Duct Bend

1050.00

149.24

149.24

0.00

156702.00

156702.00

0.00

1050.00

141.68

1050.00

207.76

349.44

0.00

366912.00

0.00

11 RABH Hopper 3 Side

1050.00

59.64

58.80

0.84

62622.00

61740.00

882.00

12 RABH Hopper 4 Side

1050.00

172.48

171.36

1.12

181104.00

179928.00

1176.00

13 Damper

1050.00

60.48

60.48

0.00

63504.00

63504.00

0.00

14 Hopper Ceiling

1050.00

6.96

6.96

0.00

7308.00

7308.00

0.00

15 Hopper Ceiling

1050.00

36.54

36.54

0.00

38367.00

38367.00

0.00

9
10

RABH Hopper 1 & 2 Side

148764.00
218148.00

16 Ducting (Damper Duct Bottom)

1050.00

12.48

12.48

0.00

13104.00

13104.00

0.00

17 Hopper Ceiling Body

1050.00

84.53

84.53

0.00

88751.25

88751.25

0.00

18 RABH Top Roof

1050.00

582.90

582.90

0.00

612045.00

612045.00

0.00

19 RABH Body (Side Corner)

1050.00

318.86

318.86

0.00

334803.00

334803.00

0.00

20 RABH Body ( Inlet Duct Side )

1050.00

246.75

246.75

0.00

259087.50

259087.50

0.00

21 Hopper Frame Four Side Box

1050.00

74.90

62.32

12.58

78645.00

65436.00

13209.00

6944.495

6456.415

488.080

7291719.75

6779235.75

512484.00

ABOVE SUM

PAYAMENT AGAINST R.A. BILL-04 FOR INSULATION IN RABH

Total Insulation Work in RABH

1050

6944.495

6456.415

488.08

7291719.75

6779235.75

512484

Previous Claimed Amount in R.A.


Bill-01

1050

5032.98

5032.98

5284629

5284629

Claimed Amount in R.A. Bill-04

1050

1911.515

1423.435

488.08

2007090.75

1494606.75

512484

NET PAYABLE AMOUNT AGAINST R.A. BILL-04 = Rs. 1494606.75

Net Excess Amount = Rs. 512484.00


This Bill Payable Amount = Rs. 1494606.75

Net Payable Amount -- Rs. Fourteen Lac Ninety Four Thousand Six Hundred Six & Seventy Five Paisa Only

TRUSST ENGINEERS

REMARKS

Excess Qty.
Excess Qty.

Excess Qty.
Excess Qty.

Excess Qty.

Grand
Estimation

Excess Qty.
Claimed

ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
DATE : 27.07.2012
CONTRACTORDESCRIPTION-

SL.
NO.

M/S. I K M INDUSTRIES PVT. LTD.


THERMAL INSULATION WORK AT KILN AREA

DESCRIPTION

100 MM Thickness Thermal


Insulation Work at Kiln Area

ABOVE SUM

RATE
(Rs.)/UNIT

CLAIMED QTY.

THIS BILL
QTY.

DIFF.

AMOUNT
CLAIMED (Rs.)

THIS BILL
AMOUNT (Rs.)

DIFF.
(Rs.)

REMARKS

1050.00

322.224

239.998

82.23

338335.20

251997.90

86337.30

Excess Quantity
Claimed

322.224

239.998

82.226

338335.20

251997.90

86337.30

NET EXCESS AMOUNT= Rs. 86337.30


NET PAYABLE AMOUNT = Rs. 251997.90
In Words- Rs. Two Lac Fifty One Thousand Nine Hundred Ninety Seven & Ninety Paisa Only

TRUSST ENGINEERS

1ST PART

2nd PART

3rd PART

4th PART

5th PART

6th PART

STRAIGHT
CUT
FLAT
FLAT
CUT
STRAIGHT
FLAT
CUT
STRAIGHT
FLAT
CUT
STRAIGHT
FLAT
CUT
STRAIGHT
FLAT
CUT
STRAIGHT

6
2
1.6
1.55
2
6.6
0
0
7.6
5.4
2
1.8

4
1
1.5
1.45
1
5.16
0
0
5.408
4.049
1
1.7

CLAIMED
293.542

53.5442
GRAND TOATL

2
-2
1
2
-2
2
0
0
2
2
-2
1

48
-4
2.4
4.495
-4
68.112
0
0
82.2016
43.7292
-4
3.06
0
0
0
0
0
0

239.9978

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
DATE : 24.08.2012

SL.
NO.

CONTRACTOR-

M/S. I K M INDUSTRIES PVT. LTD.

DESCRIPTION-

R.A. BILL-01 Dated-29.05.12 ( DISMANTLING OF INSULATION AT RABH)

DESCRIPTION

RABH Insulation
Dismantling Work

UNIT

RATE
(Rs.)/UNIT

CLAIMED
QTY.

THIS BILL
QTY.

DIFF.

AMOUNT
CLAIMED (Rs.)

THIS BILL
AMOUNT (Rs.)

DIFF.
(Rs.)

M2

225.00

1556.068

1382.708

173.360

350115.30

311109.30

39006.00

1556.068

1382.708

173.360

350115.30

311109.30

39006.00

ABOVE SUM

REMARKS

NET EXCESS AMOUNT = Rs. 39006.00


NET PAYABLE AMOUNT = Rs. 311109.30

In Words- Rs. Three Lac Eleven Thousand One Hundred Nine & Thirty Paisa Only

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
Date : 28.09.12

CONTRACTOR-

M/S. I K M INDUSTRIES PVT. LTD.

DESCRIPTION-

R.A. BILL-03 Dated-13.08.12 ( THERMAL INSULATION FOR ESP & COAL MILL DUCT )

SL.
NO.

DESCRIPTION

UNIT

RATE
(Rs.)/UNIT

CLAIMED
QTY.

THIS BILL
QTY.

DIFF.

AMOUNT
CLAIMED (Rs.)

THIS BILL
AMOUNT (Rs.)

DIFF.
(Rs.)

Thermal Insulation of ESP InletOutlet Duct,Nozzle, Hopper


casing box etc. with 50MM
LRB

M2

825.00

2802.840

2802.840

0.000

2312343.00

2312343.00

0.00

Thermal Insulation of ESP Top


Roof Boxes, Transformer Box
I/L and O/L , Reducers, Fan
Duct Line up to Chimney etc.
with 100MM LRB

M2

1050.00

2808.730

2808.730

0.000

2949166.50

2949166.50

0.00

Thermal Insulation of Coal Mill


Duct & Fan with 100MM LRB

M2

1050.00

602.100

602.100

0.000

632205.00

632205.00

0.00

5893714.50

5893714.50

0.00

ABOVE SUM

REMARKS

Note :- 20% of Payable Amount put on Hold.


HOLD AMOUNT = Rs. 1178742.90
NET PAYABLE AMOUNT = Rs. 4714971.60

4714971.60

0.00

In Words- Rs. Forty Seven Lac Fourteen Thousand Nine Hundred Seventy One and Sixty Paisa Only
TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT

SL.
NO.

Date : 19.10.12

CONTRACTOR-

M/S. I K M INDUSTRIES PVT. LTD.

DESCRIPTION-

FINAL BILL FOR MISCELLANEOUS WORK-- DATED-22.02.12

DESCRIPTION

UNIT

RATE
(Rs.)/UNIT

CLAIMED
QTY.

THIS BILL
QTY.

DIFF.

AMOUNT
CLAIMED (Rs.)

THIS BILL
AMOUNT (Rs.)

DIFF.

(Rs.)

Cement Mill Bag House


Assembly Work
( Reference Bill- R.A.-06 )

MT

6250.00

139.606

139.606

0.000

1116860.00

610776.25

506083.75

Fabrication Work in ESP

MT

6250.00

2.724

2.724

0.000

17025.00

17025.00

0.00

Cooler ESP Erection Work

MT

10750.00

36.520

36.520

0.000

392590.00

392590.00

0.00

1526475.00

750391.25

506083.75

ABOVE SUM

Note :1. Amount Rs. 270,000.00 already paid against Amount Rs. 610776.25; i.e. Balance 610776.25-270000.00 = 340776.25 to be paid
2. Amount Rs. 340776.25 is to be recovered from M/s. T.N. Chowdhary
NET EXCESS AMOUNT = Rs. 506083.75
NET PAYABLE AMOUNT = Rs. 750391.25

In Words- Rs. Seven Lac Fifty Thousand Three Hundred Ninety One and Twenty Five Paisa Only

TRUSST ENGINEERS

10.12

REMARKS

70 % of Unit Rate has


been approved

Net Payable Against


Sl.No.-1 is Rs.
340776.25 Only

6.25 to be paid

a Only

750391.25

1256475.00

USST ENGINEERS

SL.NO.

PARTICULAR

DATE

CLAIMED

DESCRIPTIONFINAL BILL FOR


MISCELLANEOUS WORK-- DATED-22.02.12

Date : 19.10.12

1526475.00

DESCRIPTIONR.A. BILL-03 Dated-13.08.12 (


THERMAL INSULATION FOR ESP & COAL MILL
DUCT )

Date : 28.09.12

5893714.50

DESCRIPTIONR.A. BILL-01 Dated-29.05.12 (


DISMANTLING OF INSULATION AT RABH)

24.08.12

350115.30

27.07.12

338335.20

4
5

DESCRIPTION-

THERMAL INSULATION WORK


AT KILN AREA

CERTIFIED

EXCESS

HOLD

REMARKS

750391.25

776083.75

Due to approved rate in CMBH

4714971.60

1178742.90

Still on Hold

311109.30

39006.00

251997.90

86337.30

You might also like