You are on page 1of 19

REPUBLICA DEL PERU

MUNICIPALIDAD DISTRITAL DE PAUCARPATA


GERENCIA DE DESARROLLO URBANO
SUB GERENCIA DE LIQUIDACIONES Y SUPERVISION
CONTRATO DE OBRA:
CONTRATISTA:
SUPERVISOR:
OBRA:

A.D.S. N 057-2010-MDP-CE
GENCE S.R.L.
ARQ. CARMEN ROSA ROJAS TICONA
"CONSTRUCCION DE CUATRO AULAS Y CAJA DE ESCALERAS I.E. BENIGNO BALLON FARFAN"

FORMATO 01: LIQUIDACIN FINAL DEL CONTRATO


CONCEPTO

COSTO FINAL DE
OBRA
(S/.)

MONTOS
PAGADOS
(S/.)

SALDOS POR
PAGAR
(S/.)

1.

MONTO DE VALORIZACIN
VALORIZACIN N 01 SIN REJUSTE
VALORIZACIN N 02 SIN REJUSTE
VALORIZACIN N 03 SIN REJUSTE
VALORIZACIN N 04 SIN REJUSTE
POR ADICIONAL N 01 SIN REAJUSTE

245,904.55
57,286.30
76,137.44
41,065.17
58,544.05
12,871.59

245,904.55
57,286.30
76,137.44
41,065.17
58,544.05
12,871.59

0.00
0.00
0.00
0.00
0.00
0.00

2.

REAJUSTE DE LA VALORIZACIN
POR OBRA PRINCIPAL
POR ADICIONALES
RETENCIN POR RETRASO DE OBRA
- En Obra Principal
- En Adicionales
REINTEGROS (Otros)

5,439.45
5,040.43
399.02
0.00
0.00
0.00
0.00

4,220.59
4,220.59
0.00
0.00
0.00
0.00
0.00

1,218.86
819.84
399.02
0.00
0.00
0.00
0.00

3.

MONTO BRUTO VALORIZADO REAJUSTADO (1+2)

251,344.00

250,125.14

1,218.86

4.

DEDUCCIN DEL REAJUSTE


POR ADELANTO EN EFECTIVO
POR ADELANTO PARA MATERIALES

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

5.

MONTO NETO VALORIZ. REAJUSTADO (3+4)

251,344.00

250,125.14

1,218.86

6.

AMORTIZACIN DE ADELANTOS
ADELANTO EN EFECTIVO
ADELANTO PARA MATERIALES

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

7.

OTROS
MAYORES GASTOS GENERALES AMPL. DE PLAZO
INTERES POR MORA EN PAGOS
OTROS CONCEPTOS

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

8.

MONTO NETO FACTURABLE SIN I.G.V. (5+6+7)

251,344.00

250,125.14

1,218.86

9.

MONTO RETENIDO
FONDO DE GARANTIA CONTRATO PRINCIPAL
FONDO DE GARANTIA CONTRATO ADICIONAL N 01

30,812.40
29,280.68
1,531.72

0.00
0.00
0.00

30,812.40
29,280.68
1,531.72

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

251,344.00

250,125.14

1,218.86

45,823.95
11,058.55
34,765.40
0.00

45,823.95
11,058.55
34,765.40
0.00

0.00
0.00
0.00
0.00

13. MONTO A COMPROMETER (8+12)

297,167.95

295,949.09

1,218.86

14. MONTO A CANCELAR FACTURABLE (11+12)

297,167.95

295,949.09

1,218.86

15. COSTO FINAL DE OBRA (5+7+12)

297,167.95

295,949.09

1,218.86

10. MULTAS Y OBLIGACIONES VARIAS


MULTA POR ATRASO EN LA ENTREGA DE OBRA
OTROS
11. MONTO LIQUIDO A PAGAR (8+9+10)
12. IMPUESTO GENERAL A LAS VENTAS (I.G.V.)
DEL MONTO NETO FACTURABLE (19%)
DEL MONTO NETO FACTURABLE (18%)
POR ADELANTOS OTORGADOS

CONTRATO DE OBRA:
CONTRATISTA:
SUPERVISOR:
OBRA:

A.D.S. N 057-2010-MDP-CE
GENCE S.R.L.
ARQ. CARMEN ROSA ROJAS TICONA
"CONSTRUCCION DE CUATRO AULAS Y CAJA DE ESCALERAS I.E. BENIGNO BALLON FARFAN"

FORMATO 02: COSTO FINAL DE OBRA

CONCEPTO

COSTO FINAL
(S/.)

OBRA
OBRA
ADICIONAL
PRINCIPAL VAL. PRINCIPAL VAL.
01
N 01
N 02,03 y 04
(S/.)

1.

MONTO DE VALORIZACIN
VALORIZACIN SIN REJUSTE

2.

245 904.54

(S/.)

57 286.30

(S/.)

175 746.64

(S/.)

12 871.59

245,904.54

57,286.30

175,746.64

12,871.59

REAJUSTE DE LA VALORIZACIN

5,439.45

916.58

4,123.85

399.02

MONTO DE REAJUSTE

5,439.45

916.58

4,123.85

399.02

RETENCIN POR RETRASO DE OBRA

0.00

0.00

0.00

0.00

REINTEGROS (Otros)

0.00

0.00

0.00

0.00

251,343.99

58,202.88

179,870.49

13,270.61

3.

MONTO BRUTO VALORIZADO REAJUSTADO (1+2)

4.

DEDUCCIN DEL REAJUSTE

0.00

0.00

0.00

0.00

POR ADELANTO EN EFECTIVO

0.00

0.00

0.00

0.00

POR ADELANTO PARA MATERIALES

0.00

0.00

0.00

0.00

251,343.99

58,202.88

179,870.49

13,270.61

5.

MONTO NETO VALORIZADO REAJUSTADO (3+4)

6.

AMORTIZACIN DE ADELANTOS

0.00

0.00

0.00

0.00

ADELANTO EN EFECTIVO

0.00

0.00

0.00

0.00

ADELANTO PARA MATERIALES

0.00

0.00

0.00

0.00

OTROS

0.00

0.00

0.00

0.00

MAYORES GASTOS GENERALES AMPL. DE PLAZO

0.00

0.00

0.00

0.00

INTERES POR MORA EN PAGOS

0.00

0.00

0.00

0.00

OTROS CONCEPTOS

0.00

0.00

0.00

0.00

251,343.99

58,202.88

179,870.49

13,270.61

7.

8.

MONTO NETO FACTURABLE SIN I.G.V. (5+6+7)

9.

MONTO RETENIDO

30,812.40

14,640.34

14,640.34

1,531.72

FONDO DE GARANTIA

30,812.40

14,640.34

14,640.34

1,531.72

MULTAS Y OBLIGACIONES VARIAS

0.00

0.00

0.00

0.00

MULTA POR ATRASO EN LA ENTREGA DE OBRA

0.00

0.00

0.00

0.00

OTROS

0.00

0.00

0.00

0.00

251,343.99

58,202.88

179,870.49

13,270.61

32,376.69

2,388.71

10.

11.

MONTO LIQUIDO A PAGAR (8+9+10)

12.

IMPUESTO GENERAL A LAS VENTAS (I.G.V.)

45,823.95

DEL MONTO NETO FACTURABLE (19%)

11,058.55

DEL MONTO NETO FACTURABLE (18%)

34,765.40

POR ADELANTOS OTORGADOS

DEDUCTIVO
N 01

11,058.55

0.00

13.

MONTO A COMPROMETER (8+12)

297,167.94

69,261.43

212,247.18

15,659.32

14.

MONTO A CANCELAR FACTURABLE (11+12)

297,167.94

69,261.43

212,247.18

15,659.32

15.

COSTO FINAL DE OBRA (5+7+12)

297,167.94

13 023.22
13,023.22

CONTRATO DE OBRA:
CONTRATISTA:
SUPERVISOR:
OBRA:

A.D.S. N 057-2010-MDP-CE
GENCE S.R.L.
ARQ. CARMEN ROSA ROJAS TICONA
"CONSTRUCCION DE CUATRO AULAS Y CAJA DE ESCALERAS I.E. BENIGNO BALLON FARFAN"

FORMATO 03: PAGOS POR ADELANTOS OTORGADOS

CONCEPTO

MONTO
PARCIAL
(S/.)

REFERENCIA
MONTO TOTAL
(S/.)

I.G.V.
(S/.)

ADELANTO EN EFECTIVO
01

0.00

02

0.00
TOTAL ADELANTO EN EFECTIVO

ADELANTO PARA MATERIALES


01

PRINCIPAL
Material 1

0.00

Material 2

0.00

TOTAL ADELANTO PARA MATERIALES


TOTAL ADELANTO EN EFECTIVO
TOTAL ADELANTO PARA MATERIALES
TOTAL ADELANTOS

0.00

0.00

0.00

LIQUIDACION
N

COMPRO.
N

FECHA DE
PAGO

FACTURA
N

CONTRATO DE OBRA: A.D.S. N 057-2010-MDP-CE


CONTRATISTA: GENCE S.R.L.
SUPERVISOR: ARQ. CARMEN ROSA ROJAS TICONA
OBRA: "CONSTRUCCION DE CUATRO AULAS Y CAJA DE ESCALERAS I.E. BENIGNO BALLON FARFAN"

FORMATO 04: PLANILLA DE METRADOS VALORIZADOS (CONTRATO PRINCIPAL / ADICIONAL)


METRADOS VALORIZADOS
ITEM.

DESCRIPCION DE PARTIDA

UND.

METRADO
BASE

VAL. 01

VAL. 02

NOVIEMBRE DICIMEBRE

VAL. 03

VAL. 04

VALORIZACION

ENERO

FEBRERO

ADICIONAL

ACUMULA
DO

01

INSTALACIONES PROVISIONALES

01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M

und

1.00

1.00

1.00

01.02

CERCO PERIMETRICO

47.00

47.00

47.00

01.03

CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO

m2

50.00

50.00

50.00

02

TRABAJOS PRELIMINARES

02.01

TRAZO Y REPLANTEO

m2

164.18

164.18

164.18

03

MOVIMIENTO DE TIERRAS

03.01

CORTE MANUAL EN T.N. HASTA 0.80MT

m3

107.00

107.00

107.00

03.02

EXCAVACION ZAPATAS DE 1.40m A 1.70m DE PROFUNDIDAD

m3

33.75

33.75

03.03

EXCAVACION CIMIENTOS HASTA 1.50m TERRENO NORMAL

m3

46.35

25.57

20.78

46.35

03.04

NIVELADO Y COMPACTADO INT., PISOS Y VEREDAS C/PLANCHA

m2

151.45

0.00

151.45

151.45

03.05

RELLENO CON MATERIAL PROPIO

m3

25.33

21.84

3.49

25.33

3.06

ELIMINACION MATERIAL EXCED. C/VOLQUETE, CARGUIO A MANO

m3

202.21

180.60

21.61

202.21

04

CONCRETO SIMPLE

04.01

SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

m2

22.50

22.50

04.02

CONCRETO 100 KG/CM2 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

32.98

21.83

04.03

CONCRETO 140 KG/CM + 25% P.M. PARA SOBRECIMIENTOS

m3

4.90

1.23

1.73

1.94

4.90

04.04

ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT

m2

65.29

16.34

23.10

25.85

65.29

04.05

SUB CIMIENTOS CONCRETO 1:12 +30% P.G.

m3

14.43

8.99

5.44

14.43

05

CONCRETO ARMADO

05.01

ZAPATAS

05.01.01

CONCRETO EN ZAPATAS F'C= 210 KG/CM2

m3

13.50

13.50

13.50

05.01.02

ACERO PARA ZAPATAS GRADO 60

kg

359.52

359.52

359.52

05.02

COLUMNAS

05.02.01

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

17.17

7.58

7.58

2.01

17.17

05.02.02

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

m2

176.75

76.81

76.81

23.13

176.75

05.02.03

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

kg

3,732.27

3,272.63

459.64

05.02.04

CONCRETO EN COLUMNAS F'C=175 KG/CM2

m3

3.20

1.94

1.26

3.20

05.02.05

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

m2

42.60

25.80

16.80

42.60

05.02.06

ACERO GRADO 60 EN COLUMNAS

kg

486.64

240.72

245.92

486.64

05.03

VIGAS

05.03.01

CONCRETO EN VIGAS F'C=210 KG/CM2

M3

24.96

20.21

4.75

24.96

05.03.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

184.50

141.25

43.25

184.50

05.03.03

ACERO GRADO 60 EN VIGAS

kg

2,583.73

2,305.39

278.34

2,583.73

05.04

LOSAS ALIGERADAS

05.04.01

CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2

m3

20.78

05.04.02

ENCOFRADO Y DESENCOFRADO NORMAL LOSAS ALIGERADAS

m2

244.56

05.04.03

ACERO GRADO 60 EN LOSAS ALIGERADAS

kg

1,730.13

1,730.13

05.04.04

LADRILLO HUECO ARCILLA 15X30X30cm P/TECHO ALIGERADO

und

2,079.00

1,925.25

05.05

ESCALERAS

05.05.01

CONCRETO EN ESCALERAS F'C=210 KG/CM2

m3

2.96

2.96

2.96

05.05.02

ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS

m2

22.31

22.31

22.31

05.05.03

ACERO GRADO 60 EN ESCALERAS

kg

358.15

358.15

358.15

05.06.00

GUARDILLA

05.06.01

CONCRETO EN GUARDILLA F'C=210 KG/CM2

m3

1.41

1.11

05.06.02

ENCOFRADO Y DESENCOFRADO NORMAL EN GUARDILLA

m2

36.90

36.90

05.06.03

ACERO GRADO 60 EN GUARDILLA

kg

123.67

62.81

60.86

123.67

06

MUROS Y TABIQUES DE LADRILLO

06.01

MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA

m2

153.12

44.21

108.91

153.12

06.02

MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARENA

m2

104.10

45.00

14.10

104.10

07

REVOQUES ENLUCIDOS Y MOLDURAS

07.01

TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA

m2

334.96

239.31

95.65

334.96

07.02

TARRAJEO EN EXTERIORES CON CEMENTO-ARENA

m2

304.78

69.06

235.72

304.78

07.03

TARRAJEO DE SUPERF. COLUMNAS (EN INTERIORES)

m2

39.00

33.60

5.40

39.00

07.04

TARRAJEO FINO DE PIZARRAS

m3

22.33

22.33

22.33

07.05

VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.

77.86

77.86

77.86

113.25

45.00

33.75

22.50
11.15

32.98

3,732.27

19.88

0.90

20.78

113.25

18.06

244.56
1,730.13

153.75

0.30

2,079.00

1.41
36.90

SALDO POR
VALORIZAR
(DEDUCTIVO)

FORMATO 04: PLANILLA DE METRADOS VALORIZADOS (CONTRATO PRINCIPAL / ADICIONAL)


METRADOS VALORIZADOS
ITEM.

DESCRIPCION DE PARTIDA

UND.

METRADO
BASE

VAL. 01

VAL. 02

NOVIEMBRE DICIMEBRE

VAL. 03

VAL. 04

VALORIZACION

ENERO

FEBRERO

ADICIONAL

7.06

REVESTIMIENTO PASOS Y CONTRAP. C/MORTERO 1:4x2cm.+PULIDO 1:2x1cm


m

08

CIELORRASOS

24.39

24.39

08.01

CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

m2

254.00

137.00

08.02

TARRAJEO DE SUPERF. VIGAS PERALTADAS-INDEPEND.(EN INTERIORES


m2

64.35

64.35

09

PISOS Y PAVIMENTOS

09.01

FALSO PISO DE 4" CON MEZCLA 1:8 C:H

m2

90.26

90.26

09.02

CONTRAPISO DE 25 MM.

m2

37.65

37.65

09.03

PISO DE CEMENTO PULIDO SIN COLOREAR E=10CM

m2

16.52

09.04

PISO DE LOSETA DE PORCELANATO

m2

180.52

09.05

VEREDA DE CONCRETO DE 4"

m2

76.49

10

CONTRAZOCALOS

10.01

CONTRAZOCALO DE LOSETA DE PORCELANATO DE 20X40 CM

109.60

10.02

CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CM.X .20M. m

102.07

11

CARPINTERIA METALICA

11.01

PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS

m2

11.02

VENTANA DE FIERRO C/PERFIL DE 1"X1/8"+HOJA BAST."L"3/4"

m2

11.03

PASAMANO DE TUBO DE FGDO. DE 2"

11.04

ACUMULA
DO

SALDO POR
VALORIZAR
(DEDUCTIVO)

24.39

117.00

254.00
64.35
90.26
37.65
16.52

16.52
180.52

76.49

76.49
109.60

109.60

45.62

102.07

11.69

11.69

11.69

43.62

43.62

43.62

21.74

21.74

21.74

CANTONERA PERFIL DE FIERRO

45.50

45.50

45.50

11.05

TAPAJUNTA CON PLANCHA METALICA

1.90

1.90

1.90

12

CERRAJERIA

12.01

BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"

pza

15.00

15.00

15.00

12.02

CHAPA P/EXTERIOR, C/LLAVES INTERIOR Y EXTERIOR 3 GOLPES

und

5.00

5.00

5.00

12.03

PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.

und

5.00

5.00

5.00

13

VIDRIOS, CRISTALES Y SIMILARES

13.01

VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS FIERRO p2

632.20

632.20

632.20

14

PINTURA

14.01

PINTADO CIELO RASO C/LATEX VINILICO

m2

318.35

318.35

318.35

14.02

PINTADO MURO INTERIOR C/LATEX VINILICO (VINILATEX O SIMI)

m2

444.59

444.59

444.59

14.03

PINTADO MURO EXTERIOR C/LATEX ACRILICO (SUPERLATEX O SIM)

m2

258.00

258.00

258.00

14.04

PINTURA AL OLEO 2 MANOS PIZARRAS

m2

22.33

22.33

22.33

14.05

PINTADO PUERTAS, VENT. METALICAS (2 MANOS ANTIC.+2 ESMALTE) m2

69.12

69.12

69.12

15

CUBIERTAS

15.01

COBERTURA LADRILLO PASTELERO ASENTADO C/MEZCLA

m2

122.85

16

INSTALACIONES ELECTRICAS

16.01

SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4) pto

26.00

26.00

26.00

16.02

FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL


und

26.00

26.00

26.00

16.03

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

17.00

17.00

17.00

16.04

TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS

pza

1.00

1.00

1.00

16.05

INTERRUPTOR THERMOMAGNETICO 2 X 15A

pza

2.00

2.00

2.00

16.06

INTERRUPTOR THERMOMAGNETICO 2 X 20A

pza

2.00

2.00

2.00

16.07

TUBERIAS PVC SAP (ELECTRICAS) D=3/4"

91.50

91.50

91.50

16.08

POZO CONEXIN A TIERRA

und

1.00

1.00

1.00

17

INSTALACION SANITARIA

17.01

BAJADAS DE LLUVIA PVC SAL DE 3"

pto

6.00

18

VARIOS

18.01

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

11.97

11.97

18.02

JUNTAS ASFALTICAS

71.70

71.70

71.70

18.03

RELLENO JUNTA DE CONSTRUCCION EN MURO

117.60

117.60

117.60

18.04

TICERO DE MADERA CEDRO

15.40

15.40

15.40

56.45

122.85

122.85

6.00

6.00
11.97

ADICIONALES

01

ESTRUCTURAS

01.01

DEMOLICIONES

01.01.01

DEMOLICION DE SOBRECIMIENTOS

m3

0.51

0.51

0.51

01.01.02

DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO

m3

0.42

0.42

0.42

01.01.03

DEMOLICION DE MUROS DE LADRILLO KK SOGA

m2

3.14

3.14

3.14

01.01.04

ELIMINACION MATERIAL EXCED. C/VOLQUETE, CARGUIO A MANO

m3

5.09

5.09

5.09

02

CONCRETO SIMPLE

02.01

CONCRETO 140 KG/CM + 25% P.M. PARA SOBRECIMIENTOS

m3

0.51

0.51

0.51

02.02

ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT

m2

5.13

5.13

5.13

02.03

RAMPA DE CONCRETO f'c=140kg/cm2

m3

3.27

3.27

3.27

03

CONCRETO ARMADO

03.01

COLUMNAS

03.01.01

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

0.16

0.16

0.16

03.01.02

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

m2

1.60

1.60

1.60

FORMATO 04: PLANILLA DE METRADOS VALORIZADOS (CONTRATO PRINCIPAL / ADICIONAL)


METRADOS VALORIZADOS
ITEM.

DESCRIPCION DE PARTIDA

UND.

METRADO
BASE

VAL. 01

VAL. 02

NOVIEMBRE DICIMEBRE

03.01.03

ACERO fy=4200 kg/cm2 GRADO 60 EN COLUMNAS

03.02

VIGAS

03.02.01
03.02.02

VAL. 03

VAL. 04

VALORIZACION

ENERO

FEBRERO

ADICIONAL

ACUMULA
DO

kg

12.06

12.06

12.06

CONCRETO EN VIGAS F'C=210 KG/CM2

m3

0.36

0.36

0.36

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

0.78

0.78

0.78

03.02.03

ACERO fy=4200 kg/cm2 GRADO 60 EN VIGAS

kg

22.37

22.37

22.37

04

MUROS Y TABIQUES DE LADRILLO

04.01

MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA

m2

15.68

15.68

15.68

05

REVOQUES ENLUCIDOS Y MOLDURAS

05.01

TARRAJEO EN EXTERIORES CON CEMENTO-ARENA

m2

34.20

34.20

34.20

06

PISOS Y PAVIMENTOS

06.01

PISO DE CERAMICO ANTIDESLIZANTE DE 0.40x0.40m

m2

180.52

180.52

180.52

07

PINTURA

07.01

PINTURA VINILICA DE MURO EXTERIOR 02 MANOS

m2

34.20

34.20

34.20

08

CUBIERTAS

08.01

COBERTURA C/TEJA DE ARCILLA ASENTADO CON MEZCLA

m2

1.43

1.43

1.43

SALDO POR
VALORIZAR
(DEDUCTIVO)

FORMATO 05: VALORIZACIONES CALCULADAS A FEBRERO DE 2011


(CONTRATO PRINCIPAL / ADICIONAL)
CONTRATO DE OBRA: A.D.S. N 057-2010-MDP-CE
CONTRATISTA: GENCE S.R.L.
SUPERVISOR: ARQ. CARMEN ROSA ROJAS TICONA
OBRA: "CONSTRUCCION DE CUATRO AULAS Y CAJA DE ESCALERAS I.E. BENIGNO BALLON FARFAN"
CONTRATO PRINCIPAL

ITEM

01
01.01
01.02
01.03
02
02.01
03
03.01
03.02
03.03
03.04
03.05
3.06
04
04.01
04.02
04.03
04.04
04.05
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
05.06.00
05.06.01
05.06.02
05.06.03
06
06.01
06.02
07
07.01
07.02
07.03
07.04
07.05

DESCRIPCION DE PARTIDA

METRA DO
UND.
REESTRUCTU
RADO

VALORIZACIONES

PRECIO
UNITARIO

PRESU
PUESTO

S/.

S/.

VALORIZACION 01

CALCULADAS
VALORIZACION 02

NOVIEMBRE
METRADO

S/.

DICIEMBRE
%

METRADO

S/.

INSTALACIONES PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
CERCO PERIMETRICO
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
TRABAJOS PRELIMINARES

und
m
m2

1.00
47.00
50.00

756.07
15.42
81.67

756.07
724.74
4,083.50

1.00
47.00
50.00

756.07
724.74
4,083.50

100.00
100.00
100.00

TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS

m2

164.18

2.49

408.81

164.18

408.81

100.00

CORTE MANUAL EN T.N. HASTA 0.80MT


EXCAVACION ZAPATAS DE 1.40m A 1.70m DE PROFUNDIDAD
EXCAVACION CIMIENTOS HASTA 1.50m TERRENO NORMAL
NIVELADO Y COMPACTADO INT., PISOS Y VEREDAS C/PLANCHA
RELLENO CON MATERIAL PROPIO
ELIMINACION MAT. EXCED. C/VOLQUETE, CARGUIO A MANO
CONCRETO SIMPLE

m3
m3
m3
m2
m3
m3

107.00
33.75
46.35
151.45
25.33
202.21

25.03
29.20
29.20
2.66
29.31
23.60

2,678.21
985.50
1,353.42
402.86
742.42
4,772.16

107.00
33.75
25.57

2,678.21
985.50
746.64

100.00
100.00
55.17

21.84
180.60

640.13
4,262.16

86.22
89.31

SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON


CONCRETO 100 KG/CM2 +30% P.G. PARA CIMIENTOS CORRIDOS
CONCRETO 140 KG/CM + 25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT
SUB CIMIENTOS CONCRETO 1:12 +30% P.G.
CONCRETO ARMADO
ZAPATAS

m2
m3
m3
m2
m3

22.50
32.98
4.90
65.29
14.43

17.73
155.86
218.78
35.05
133.16

398.93
5,140.26
1,072.02
2,288.41
1,921.50

22.50
21.83
1.23
16.34
8.99

398.93
3,402.42
269.10
572.72
1,197.11

100.00
66.19
25.10
25.03
62.30

CONCRETO EN ZAPATAS F'C= 210 KG/CM2


ACERO PARA ZAPATAS GRADO 60
COLUMNAS

m3
kg

13.50
359.52

281.27
3.76

3,797.15
1,351.80

13.50
359.52

3,797.15
1,351.80

100.00
100.00

CONCRETO EN COLUMNAS F'C=210 KG/CM2


ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS
CONCRETO EN COLUMNAS F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO GRADO 60 EN COLUMNAS
VIGAS

m3
m2
kg
m3
m2
kg

17.17
176.75
3,732.27
3.20
42.60
486.64

382.19
48.93
3.76
333.34
38.50
3.76

6,562.20
8,648.38
14,033.34
1,066.69
1,640.10
1,829.77

7.58
76.81
3,272.63

2,897.00
3,758.31
12,305.09

44.15
43.46
87.68

CONCRETO EN VIGAS F'C=210 KG/CM2


ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO GRADO 60 EN VIGAS
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO N LOSAS ALIGERADAS
ACERO GRADO 60 EN LOSAS ALIGERADAS
LADRILLO HUECO ARCILLA 15X30X30cm P/TECHO ALIGERADO
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
ACERO GRADO 60 EN ESCALERAS
GUARDILLA
CONCRETO EN GUARDILLA F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN GUARDILLA
ACERO GRADO 60 EN GUARDILLA
MUROS Y TABIQUES DE LADRILLO
MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA
MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARENA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
TARRAJEO DE COLUMNAS INDEPENDIENTES (EN INTERIORES)
TARRAJEO FINO DE PIZARRAS
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.

M3
m2
kg

24.96
184.50
2,583.73

390.96
44.99
3.76

9,758.36
8,300.66
9,714.82

m3
m2
kg
und

20.78
244.56
1,730.13
2,079.00

351.01
43.08
3.76
2.38

7,293.99
10,535.64
6,505.29
4,948.02

m3
m2
kg

2.96
22.31
358.15

389.24
48.19
3.76

1,152.15
1,075.12
1,346.64

m3
m2
kg

1.41
36.90
123.67

333.34
38.50
3.76

470.01
1,420.65
465.00

m2
m2

153.12
104.10

48.56
74.49

7,435.51
7,754.41

m2
m2
m2
m3
m

334.96
304.78
39.00
22.33
77.86

18.22
24.01
21.78
20.67
9.30

6,102.97
7,317.77
849.42
461.56
724.10

113.25

45.00

4,878.81

3,352.05

46.31

43.23

1.73
23.10

378.49
809.66

35.31

7.58
76.81
459.64
1.94
25.80
240.72

2,897.00
3,758.31
1,728.25
646.68
993.30
905.11

44.15

20.21
141.25
2,305.39

7,901.30
6,354.84
8,668.27

80.97

19.88
113.25
1,730.13
1,925.25

6,978.08
4,878.81
6,505.29
4,582.10

95.67

1.11
36.90
62.81

370.01
1,420.65
236.17

44.21
45.00

2,146.84
3,352.05

35.38

43.46
12.32
60.62
60.56
49.47

76.56
89.23

46.31
100.00
92.60

78.72
100.00
50.79
28.87
43.23

CONTRATO PRINCIPAL

ITEM

7.06
08
08.01
08.02
09
09.01
09.02
09.03
09.04
09.05
10
10.01
10.02
11
11.01
11.02
11.03
11.04
11.05
12
12.01
12.02
12.03
13
13.01
14
14.01
14.02
14.03
14.04
14.05
15
15.01
16
16.01
16.02
16.03
16.04
16.05
16.06
16.07
16.08
17
17.01
18
18.01
18.02
18.03
18.04
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
02
02.01
02.02
02.03
03
03.01
03.01.01
03.01.02

DESCRIPCION DE PARTIDA

REVEST. PASOS Y CONTRAP. C/MORTERO 1:4x2cm+PULIDO 1:2x1cm


CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
TARRAJEO DE VIGAS PERALTADAS-INDEPEND.(EN INTERIORES
PISOS Y PAVIMENTOS
FALSO PISO DE 4" CON MEZCLA 1:8 C:H
CONTRAPISO DE 25 MM.
PISO DE CEMENTO PULIDO SIN COLOREAR E=10CM
PISO DE LOSETA DE PORCELANATO
VEREDA DE CONCRETO DE 4"
CONTRAZOCALOS
CONTRAZOCALO DE LOSETA DE PORCELANATO DE 20X40 CM
CONTRAZOCALO CEMENTO PULIDO C/MORTERO 1:5 DE 2cmx2cm.
CARPINTERIA METALICA
PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS
VENTANA DE FIERRO C/PERFIL DE 1"X1/8"+HOJA BAST."L"3/4"
PASAMANO DE TUBO DE FGDO. DE 2"
CANTONERA PERFIL DE FIERRO
TAPAJUNTA CON PLANCHA METALICA
CERRAJERIA

METRA DO
UND.
REESTRUCTU
RADO

VALORIZACIONES

PRECIO
UNITARIO

PRESU
PUESTO

S/.

S/.

24.39

30.54

744.87

m2
m2

254.00
64.35

30.75
28.77

7,810.50
1,851.35

m2
m2
m2
m2
m2

90.26
37.65
16.52
180.52
76.49

23.66
20.90
33.53
67.82
41.78

2,135.55
786.89
553.92
12,242.87
3,195.75

m
m

109.60
102.07

19.68
10.53

2,156.93
1,074.80

m2
m2
m
m
m

11.69
43.62
21.74
45.50
1.90

166.38
95.24
32.80
32.30
89.14

1,944.98
4,154.37
713.07
1,469.65
169.37

BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"


pza
CHAPA P/EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES und
PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.
und
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS FIERROp2
PINTURA

15.00
5.00
5.00

15.23
70.10
61.61

228.45
350.50
308.05

632.20

7.40

4,678.28

PINTADO DE CIELO RASO C/LATEX VINILICO (VINILATEX O SIMILAR) m2


PINTADO DE MURO INTERIOR C/LATEX VINILICO (VINILATEX O SIMI) m2
PINTADO MURO EXTERIOR C/LATEX ACRILICO (SUPERLATEX O SIM) m2
PINTURA AL OLEO 2 MANOS PIZARRAS
m2
PINTADO PUERTAS, VENT. METALICAS (2 MANOS ANTIC.+2 ESMALTE)m2
CUBIERTAS
COBERTURA LADRILLO PASTELERO ASENTADO C/MEZCLA
m2
INSTALACIONES ELECTRICAS
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4) pto
FLUORESCENTE RECTO ISPE 2x40W INC/EQUIPO Y PANT.
und
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC
pto
TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS
pza
INTERRUPTOR THERMOMAGNETICO 2 X 15A
pza
INTERRUPTOR THERMOMAGNETICO 2 X 20A
pza
TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
m
POZO CONEXIN A TIERRA
und
INSTALACION SANITARIA
BAJADAS DE LLUVIA PVC SAL DE 3"
pto
VARIOS

318.35
444.59
258.00
22.33
69.12

7.89
7.04
7.57
8.67
10.35

2,511.78
3,129.91
1,953.06
193.60
715.39

122.85

35.69

4,384.52

26.00
26.00
17.00
1.00
2.00
2.00
91.50
1.00

70.46
107.12
59.91
118.48
54.63
64.63
7.52
526.14

1,831.96
2,785.12
1,018.47
118.48
109.26
129.26
688.08
526.14

6.00

64.58

387.48

JUNTA DE CONSTRUCCION CON TEKNOPORT


JUNTAS ASFALTICAS
RELLENO JUNTA DE CONSTRUCCION EN MURO
TICERO DE MADERA CEDRO
ADICIONALES
ESTRUCTURAS
DEMOLICIONES

m2
m
m
m

11.97
71.70
117.60
15.40

32.92
4.80
23.29
31.98

394.05
344.16
2,738.90
492.49

DEMOLICION DE SOBRECIMIENTOS
DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO
DEMOLICION DE MUROS DE LADRILLO KK SOGA
ELIMINACION MATERIAL EXCED. C/VOLQUETE, CARGUIO A MANO
CONCRETO SIMPLE

m3
m3
m2
m3

0.51
0.42
3.14
5.09

25.33
22.90
11.42
23.60

CONCRETO 140 KG/CM + 25% P.M. PARA SOBRECIMIENTOS


ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT
RAMPA DE CONCRETO f'c=140kg/cm2
CONCRETO ARMADO
COLUMNAS

m3
m2
m3

0.51
5.13
3.27

218.78
35.05
279.91

CONCRETO EN COLUMNAS F'C=210 KG/CM2


ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

m3
m2

0.16
1.60

382.19
38.50

CALCULADAS

VALORIZACION 01

VALORIZACION 02

NOVIEMBRE

DICIEMBRE

METRADO

S/.

METRADO

137.00
64.35

6.00

387.48

100.00

S/.

4,212.75
1,851.35

53.94
100.00

CONTRATO PRINCIPAL

ITEM

03.01.03
03.02
03.02.01
03.02.02
03.02.03
04
04.01
05
05.01
06
06.01
07
07.01
08
08.01
(A)
(B)
(C)

DESCRIPCION DE PARTIDA

METRA DO
UND.
REESTRUCTU
RADO

PRECIO
UNITARIO

PRESU
PUESTO

S/.

S/.

ACERO fy=4200 kg/cm2 GRADO 60 EN COLUMNAS


VIGAS

kg

12.06

3.76

CONCRETO EN VIGAS F'C=210 KG/CM2


ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO fy=4200 kg/cm2 GRADO 60 EN VIGAS
MUROS Y TABIQUES DE LADRILLO

m3
m2
kg

0.36
0.78
22.37

390.96
33.78
3.76

MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA


REVOQUES ENLUCIDOS Y MOLDURAS

m2

15.68

48.56

TARRAJEO EN EXTERIORES CON CEMENTO-ARENA


PISOS Y PAVIMENTOS

m2

34.20

24.03

PISO DE CERAMICO ANTIDESLIZANTE DE 0.40x0.40m


PINTURA

m2

180.52

46.64

PINTURA VINILICA DE MURO EXTERIOR 02 MANOS


CUBIERTAS

m2

34.20

7.57

COBERTURA C/TEJA DE ARCILLA ASENTADO CON MEZCLA

m2

1.43

23.92

COSTO DIRECTO:
GASTOS GENERALES:
UTILIDADES:
TOTAL VALORIZADO SIN I.G.V. ( A + B + C ):
FACTOR DE RELACION:
PORCENTAJE DE AVANCE CONSIDERADO EN VALORIZACIONES:

13.1932 % DE ( A )
5.0 % DE ( A )
0.90

231,312.59
30,517.51
11,565.63
273,395.73
246,056.16

VALORIZACIONES

CALCULADAS

VALORIZACION 01

VALORIZACION 02

NOVIEMBRE

DICIEMBRE

METRADO

S/.

53,853.73
7,105.02
2,692.69
63,651.44
57,286.30
23.28%

METRADO

S/.

71,575.31
9,443.07
3,578.77
84,597.15
76,137.44
30.94%

PREUPUESTO BASE: 325,340.92


PREUPUESTO CONTRATADO: 292,806.83
PREUPUESTO ADICIONAL:
PREUPUESTO DEDUCTIVO:

15,317.19
15,497.62

(R.G.M. N 022-2011-MDP)
(R.G.M. N 022-2011-MDP)
VALORIZACIONES CALCULADAS

VALORIZACION 03

VALORIZACION 04

VALORIZACION

ENERO

FEBRERO

ADICIONAL

METRADO

S/.

METRADO

S/.

METRADO

S/.

ACUMULADO ACTUAL
%

METRADO

S/.

DEDUCTIVO
%

1.00
47.00
50.00

756.07
724.74
4,083.50

100.00
100.00
100.00

164.18

408.81

100.00

2,678.21
985.50
1,353.42
402.86
742.42
4,772.16

100.00
100.00
100.00
100.00
100.00
100.00

20.78
151.45
3.49
21.61

606.78
402.86
102.29
510.00

44.83
100.00
13.78
10.69

107.00
33.75
46.35
151.45
25.33
202.21

11.15
1.94
25.85
5.44

1,737.84
424.43
906.04
724.39

33.81
39.59
39.59
37.70

22.50
32.98
4.90
65.29
14.43

398.93
5,140.26
1,072.02
2,288.41
1,921.50

100.00
100.00
100.00
100.00
100.00

13.50
359.52

3,797.15
1,351.80

100.00
100.00

17.17
176.75
3,732.27
3.20
42.60
486.64

6,562.20
8,648.38
14,033.34
1,066.69
1,640.10
1,829.77

100.00
100.00
100.00
100.00
100.00
100.00

2.01
23.13

768.20
1,131.75

11.71
13.09

1.26
16.80
245.92

420.01
646.80
924.66

39.38
39.44
50.53
4.75
43.25
278.34

1,857.06
1,945.82
1,046.56

19.03
23.44
10.77

24.96
184.50
2,583.73

9,758.36
8,300.66
9,714.82

100.00
100.00
100.00

0.90
18.06

315.91
778.02

4.33
7.38

153.75

365.93

7.40

20.78
244.56
1,730.13
2,079.00

7,293.99
10,535.64
6,505.29
4,948.02

100.00
100.00
100.00
100.00

2.96
22.31
358.15

1,152.15
1,075.12
1,346.64

100.00
100.00
100.00

2.96
22.31
358.15

1,152.15
1,075.12
1,346.64

100.00
100.00
100.00

470.01
1,420.65
465.00

100.00
100.00
100.00

0.30

100.00

21.28

60.86

228.83

49.21

1.41
36.90
123.67

108.91
14.10

5,288.67
1,050.31

71.13
13.54

153.12
104.10

7,435.51
7,754.41

100.00
100.00

239.31
69.06
33.60
22.33
77.86

4,360.23
1,658.13
731.81
461.56
724.10

71.44
22.66
86.15
100.00
100.00

334.96
304.78
39.00
22.33
77.86

6,102.97
7,317.77
849.42
461.56
724.10

100.00
100.00
100.00
100.00
100.00

95.65
235.72
5.40

1,742.74
5,659.64
117.61

28.56
77.34
13.85

METRA
DO

S/.

VALORIZACIONES CALCULADAS
VALORIZACION 03

VALORIZACION 04

VALORIZACION

ENERO

FEBRERO

ADICIONAL

METRADO

S/.

METRADO

24.39

S/.

744.87

METRADO

S/.

ACUMULADO ACTUAL
%

100.00

METRADO

S/.

DEDUCTIVO
%

24.39

744.87

100.00

117.00

3,597.75

46.06

254.00
64.35

7,810.50
1,851.35

100.00
100.00

90.26
37.65

2,135.55
786.89

100.00
100.00

90.26
37.65
16.52

2,135.55
786.89
553.92

100.00
100.00
100.00

76.49

3,195.75

100.00

16.52

553.92

100.00

METRA
DO

180.52
76.49

3,195.75

100.00

56.45

594.42

55.31

122.85

4,384.52

109.60
45.62

2,156.93
480.38

100.00
44.69

109.60
102.07

2,156.93
1,074.80

100.00
100.00

11.69
43.62
21.74
45.50
1.90

1,944.98
4,154.37
713.07
1,469.65
169.37

100.00
100.00
100.00
100.00
100.00

11.69
43.62
21.74
45.50
1.90

1,944.98
4,154.37
713.07
1,469.65
169.37

100.00
100.00
100.00
100.00
100.00

15.00
5.00
5.00

228.45
350.50
308.05

100.00
100.00
100.00

15.00
5.00
5.00

228.45
350.50
308.05

100.00
100.00
100.00

632.20

4,678.28

100.00

632.20

4,678.28

100.00

318.35
444.59
258.00
22.33
69.12

2,511.78
3,129.91
1,953.06
193.60
715.39

100.00
100.00
100.00
100.00
100.00

318.35
444.59
258.00
22.33
69.12

2,511.78
3,129.91
1,953.06
193.60
715.39

100.00
100.00
100.00
100.00
100.00

122.85

4,384.52

100.00

26.00
26.00
17.00
1.00
2.00
2.00
91.50
1.00

1,831.96
2,785.12
1,018.47
118.48
109.26
129.26
688.08
526.14

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

6.00

387.48

100.00

11.97
71.70
117.60
15.40

394.05
344.16
2,738.90
492.49

100.00
100.00
100.00
100.00

100.00
26.00
26.00
17.00
1.00
2.00
2.00
91.50
1.00

11.97
71.70
117.60
15.40

1,831.96
2,785.12
1,018.47
118.48
109.26
129.26
688.08
526.14

394.05
344.16
2,738.90
492.49

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00

0.51
0.42
3.14
5.09

12.92
9.62
35.86
120.12

100.00
100.00
100.00
100.00

0.51
0.42
3.14
5.09

12.92
9.62
35.86
120.12

100.00
100.00
100.00
100.00

0.51
5.13
3.27

111.58
179.81
915.31

100.00
100.00
100.00

0.51
5.13
3.27

111.58
179.81
915.31

100.00
100.00
100.00

0.16
1.60

61.15
61.60

100.00
100.00

0.16
1.60

61.15
61.60

100.00
100.00

S/.

12,242.87

100.00

VALORIZACIONES CALCULADAS
VALORIZACION 03

VALORIZACION 04

VALORIZACION

ENERO

FEBRERO

ADICIONAL

METRADO

S/.

38,604.57
5,093.17
1,930.23
45,627.97
41,065.17
16.69%

METRADO

S/.

55,036.13
7,261.02
2,751.81
65,048.96
58,544.06
23.80%

METRADO

S/.

ACUMULADO ACTUAL
%

METRADO

S/.

DEDUCTIVO
%

12.06

45.35

100.00

12.06

45.35

100.00

0.36
0.78
22.37

140.75
26.35
84.11

100.00
100.00
100.00

0.36
0.78
22.37

140.75
26.35
84.11

100.00
100.00
100.00

15.68

761.42

100.00

15.68

761.42

100.00

34.20

821.83

34.20

821.83

180.52

8,419.45

100.00
100.00
100.00

180.52

8,419.45

100.00
100.00
100.00

34.20

258.89

100.00

34.20

258.89

100.00

1.43

34.21

100.00

1.43

34.21

100.00

12,100.33
1,596.42
605.02
14,301.77
12,871.59

231,170.05
30,498.70
11,558.50
273,227.25
245,904.53

METRA
DO

S/.

12,242.87
1,615.23
612.14
14,470.24
13,023.22
5.29%

CONTRATO DE OBRA:
CONTRATISTA:
SUPERVISOR:
OBRA:

ADJUDICACION DIRECTA SELECTIVA N 057-2010-MDP-CE


GENCE S.R.L.
ARQ. CARMEN ROSA ROJAS TICONA
"CONSTRUCCION DE CUATRO AULAS Y CAJA DE ESCALERAS I.E. BENIGNO BALLON FARFAN"

FORMATO 06: CALCULO DEL REAJUSTE


FORMULA GENERAL

A * V Kr
( - 1) - Dm- Dr
C
Ka
R = Reajuste del Componente en soles (S/.) de la Valorizacin mensual
R= V* (Kr - 1) -

Donde:

V=
A=
C=
Kr =
Ka =
Dm =
Dr =

Monto del Componete en Soles (S/.) de la Valorizacin mensual


Monto del Adelanto en Efectivo
Saldo del Contrato Principal a la fecha del otorgamiento del Adelanto
Factor de Reajuste del mes respectivo
Factor de Reajuste por Adelanto para Materiales
Deduccin del Reajuste por Adelanto para Materiales
Deduccin del Reajuste por Atraso en la Obra

Datos
A (S/.) =
C (S/.) =
Ka =

0.00
0.00

VALORIZACIN
N

01
02
03
04
05

PERIODO

VALORIZACION
(S/.)

NOVIEMBRE
DICIEMBRE
ENERO
FEBRERO
ADICIONAL

57,286.30
76,137.44
41,065.17
58,544.05
12,871.59

TOTAL

245,904.55

Kr

1.016
1.019
1.021
1.031
1.031

REAJUSTE
(S/.)

916.58
1,446.61
862.37
1,814.87
399.02

AMORTIZA
A*V/C
(S/.)

0.00
0.00
0.00
0.00
0.00

DEDUCCIONES
POR ADEL.
EFECTIVO

0.00
0.00
0.00
0.00
0.00

POR ADEL.
MATERIALES

0.00
0.00
0.00
0.00
0.00

POR ATRASO
EN OBRA

REAJUSTE
FINAL
(S/.)

0.00
0.00
0.00
0.00
0.00

916.58
1,446.61
862.37
1,814.87
399.02
5,439.45

CONTRATO DE OBRA
CONTRATISTA
SUPERVISOR
OBRA
TRAMO

FORMATO 07: RESUMEN DEDUCCIN DEL REAJUSTE POR ADELANTO PARA


MATERIALES
FORMULA GENERAL

Ir
Dm = A * ( - 1)
Ia
Donde
Dm = Deduccin del Reajuste, que no corresponde por Adelanto Especfico para Materiales
A = Monto del Adelanto utilizado en la Valorizacin que se reajusta
Ir = Indice del elemento representativo al mes respectivo de reajuste
Ia = Indice del elemento representativo al mes de cancelacin del Adelanto

RESUMEN
MATERIAL

TOTAL S/.

ADELANTO AMORTIZA (A)


(S/.)
(S/.)

SALDO
(S/.)

Dm
(S/.)

CONTRATO DE OBRA
CONTRATISTA
SUPERVISOR
OBRA
TRAMO

FORMATO 08: DEDUCCIN DEL REAJUSTE POR ADELANTO PARA MATERIALES


EN EL CONTRATO (PRINCIPAL / ADICIONAL)
MATERIAL
FECHA N

TOTAL

S/.

VALORIZACIN
N
PERIODO

Amortiza (A)
(S/.)

SALDO
(S/.)

INDICE UNIFICADO
Ir
Ia

Dm
(S/.)

CONTRATO DE OBRA
CONTRATISTA
SUPERVISOR
OBRA
TRAMO

FORMATO 09: RETENCIN DEL REAJUSTE POR RETRASO EN LA OBRA


VALORIZACIN
N

S/.

AVANCE PARCIAL
PROGR.
(A)

REAL
(B)

AVANCE ACUMULADO
PROGR.
(A)

REAL
(B)

FACTOR
Kr

REAJUSTE PARCIAL
PROG.
C=A*(K-1)

REAL
D=B*(K-1)

REAJUSTE PARCIAL
PROG.
C=A*(K-1)

REAL
D=B*(K-1)

RETENCIN Dr

01
02
03
04

NOTA :
Hay Retencin por Atraso cuando la obra esta atrasada y el Reajuste Acumulado Valorizado es Mayor que el Reajuste Acumulado Programado
Se considera el Calendario de Avance de Obra (CAO), con metrados finales

ESTADO DE LA
OBRA

CONTRATO DE OBRA:
CONTRATISTA:
SUPERVISOR:
OBRA:

A.D.S. N 057-2010-MDP-CE
GENCE S.R.L.
ARQ. CARMEN ROSA ROJAS TICONA
"CONSTRUCCION DE CUATRO AULAS Y CAJA DE ESCALERAS I.E. BENIGNO BALLON FARFAN"

FORMATO 10: CALCULO DE LOS COEFICIENTES DE REAJUSTE

Frmula Polinmica (segn Contrato) : K= 0.314*(Mr/Mo)+0.086*(AAr/AAo)+0.071*(BAr/BAo)+0.074*(Cr/Co)+0.064*(DCr/DCo)+0.059*(Mr/Mo)+0.052*(MMr/Mmo)+0.280*(Ir/Io)

INDICE UNIFICADO ( I.U. )


SIMB.

I.U.

M
AA

47
02
03
05
17
21
24
30
43
48
49
39

B
C
DC
M
MM
I

CONCEPTO

MANO DE OBRA INCL. LEYES SOCIALES


ACERO DE CONSTRUCCION LISO
ACERO DE CONSTRUCCION CORRUGADO
AGREGADO GRUESO
BLOQUE Y LADRILLO
CEMENTO PORTLAND TIPO 1
CERAMICA ESMALTADA Y S/ESMALTAR
DLAR
MADERA NACIONAL P/ENCOFRAR Y CARPINTERIA
MAQUINARIA Y EQUIPO NACIONAL
MAQUINARIA Y EQUIPO IMPORTADO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR

COEFICIENTE DE REAJUSTE ( K ) :

COEF.

INCIDENCIA

0.314
0.086
0.086
0.071
0.071
0.074
0.064
0.064
0.059
0.052
0.052
0.280
1.273

100.000%
15.116%
84.884%
46.479%
53.521%
100.000%
46.875%
53.125%
100.000%
59.615%
40.385%
100.000%

mes Base
May-10
415.58
518.10
513.35
607.09
666.07
423.60
270.34
361.46
527.17
334.68
244.28
351.51

mes 1
NOVIEMBRE
430.83
520.51
515.74
613.68
662.96
423.60
269.53
357.53
541.28
331.70
240.48
354.04

0.326
0.013
0.073
0.033
0.038
0.074
0.030
0.034
0.061
0.031
0.021
0.282
1.016

mes 2
DICIEMBRE
430.83
522.36
517.58
619.19
664.12
423.60
269.59
358.95
545.20
332.35
240.97
354.67

0.326
0.013
0.074
0.034
0.038
0.074
0.030
0.034
0.061
0.031
0.021
0.283
1.019

mes 3
ENERO
427.68
533.49
528.61
619.69
704.56
423.60
270.22
356.00
561.16
331.54
238.94
356.05

0.323
0.013
0.075
0.034
0.040
0.074
0.030
0.033
0.063
0.031
0.021
0.284
1.021

mes 4
FEBRERO
427.68
578.78
573.48
623.10
722.24
423.60
269.93
355.50
558.01
331.31
238.57
357.41

0.323
0.015
0.082
0.034
0.041
0.074
0.030
0.033
0.062
0.031
0.021
0.285
1.031

RESUMEN VALORIZACIONES
(Includo reajuste)
Obra

MEJORAMIENTO DEL COMPLEJO DEPORTIVO15 DE AGOSTO EN LA URB. 15 DE AGOSTO

Contratista

ARES S.A.C

Supervisor de obra

Ing. JOSE LUIS ROMERO GONZALES

Monto del Contrato

S/.

290,676.30 (con IGV)

244,265.80

Monto base

S/.

322,973.66 (con IGV)

271,406.44

Factor de Relacion

0.9000
No se solicit

Monto de adelanto directo


Monto de adelanto materiales
Ubicacin

ITEM

S/.
116,270.52 con IGV
PAUCARPATA
AREQUIPA

S/.

97,706.32 sin IGV

PRESUPUESTO
BASE

OBRAS

1.00 MEJORAMIENTO DEL COMPLEJO DEPORTIVO

COSTO DIRECTO

VALORIZAC. N 1
S/.

236,005.60

66,041.97

236,005.60

66,041.97

GASTOS GENERALES

10.00000%

23,600.56

6,604.20

UTILIDAD

5.00000%

11,800.28

3,302.10

271,406.44

75,948.27

0.90000

0.90000

244,265.80

68,353.45

46,410.50

12,987.16

290,676.30
100.00%

81,340.61
27.98%

REAJUSTE

1,845.54

I.G.V. del Reajuste


TOTAL REAJUSTE

350.65
2,196.19

SUB TOTAL
F.R.
SUB TOTAL CONTRATADO
IMPUESTO GENERAL A LAS VENTAS

19.00%

TOTAL (Segn presupuesto contratado)

TOTAL VALORIZACIONES (Valorizadas-pagadas)


* En este cuadro no se incluyen la regularizacin de reajustes

83,536.80

LORIZACIONES
reajuste)

O EN LA URB. 15 DE AGOSTO

(sin IGV)
(sin IGV)

VALORIZAC. N 2

VALORIZAC. N 3

TOTAL

SALDO

S/.

S/.

VALORIZADO

P/ VALORIZAR

S/.

S/.

87,193.19

82,770.43

236,005.60

0.00

87,193.19

82,770.43

236,005.60

0.00

8,719.32

8,277.04

23,600.56

0.00

4,359.66

4,138.52

11,800.28

0.00

100,272.17

95,185.99

271,406.44

0.00

0.90000

0.90000

0.90000

0.90000

90,244.96

85,667.39

244,265.80

0.00

17,146.54

15,420.13

107,391.50
36.95%

101,087.52
34.78%

45,553.83
289,819.63
99.71%

856.67
856.67
0.29%

4,151.27

4,283.37

10,280.18

788.74
4,940.01

771.01
5,054.38

1,910.40
12,190.58

106,141.90

302,010.21

112,331.51
debio facturarse

65,383.85
46,947.66
8920.0554
55,867.72

facturado

63564.75

1,819.10
97706.32
18564.2008
116270.5208

50,758.66
9,136.56
59,895.22
115,762.93