Metering panel 6. Highmast lighting FOPH 1. Cable tray erection 2. Cable laying TG - 0 Mtr 1. Panel testing D TG - 12.6 Mtr 1. Panel erection 2. Lighting (C-D Bay) Boiler 1. LIGHTING a) 51 Mtr Floor Lighting. b) 58 Mtr Floor Lighting. c) 60 Mtr Floor Lighting. Sri Durga (ABB) 24 Points 15 Points 29 Points ABB AGENCY TOTAL QTY
DEPARTMENT: Electrical MAN CUM.PROGRES REMARKS/ CONSTRAINTS POWER QTY % 80.00 42.86
Scheme checking (WOP) 28 28 sets. No work done For 1 highmast, Earthing (WOP) 12
USPL
375 Mtrs
No work done
30
20.00
IKE ABB
No work done
No work done
Wiring & JB fixing completed for 24 Light points. JB fixing & Wiring completed for 15 light points. JB fixing completed for 29 Light points & Wiring completed for 29 light points.
2. CABLING a) Soot blower MCC to motor (Power cable) b) Soot blower MCC to motor (Control cable) c) V&D MCC to Motor (Power cable) d) Boiler MCC to Motor (Power cable) e) Boiler MCC to Motor (Control cable) F DM PLANT a) Cabling b) Earthing c) RO System LT motors no load test FIRE WATER & MISC. MCC ROOM a) Transformer erection
CVL
9214 Mtrs 9214 Mtrs 25034 Mtrs 17759 Mtrs 3668 Mtrs
17 nos.
12
70.59
ABB
2 nos.
No work done
No of Poles No of Span Length of Span Length of Conductor 5 6 420 Mtrs 1260 Mtrs Dismantling 5 nos PSC 6 300 Mtrs 900 Mtrs New Erection 2 nos Joist