IBEUL DAILY PROGRESS REPORT S.NO. A DESCRIPTION SWITCH - YARD 2. CR panel 3. ISO Allignment 4. ISO Testing 5.

Metering panel 6. Highmast lighting FOPH 1. Cable tray erection 2. Cable laying TG - 0 Mtr 1. Panel testing D TG - 12.6 Mtr 1. Panel erection 2. Lighting (C-D Bay) Boiler 1. LIGHTING a) 51 Mtr Floor Lighting. b) 58 Mtr Floor Lighting. c) 60 Mtr Floor Lighting. Sri Durga (ABB) 24 Points 15 Points 29 Points ABB AGENCY TOTAL QTY

DATE: 04.03.14 DAY'S PROGRESS

DEPARTMENT: Electrical MAN CUM.PROGRES REMARKS/ CONSTRAINTS POWER QTY % 80.00 42.86

Scheme checking (WOP) 28 28 sets. No work done For 1 highmast, Earthing (WOP) 12

USPL

375 Mtrs

No work done

30

20.00

Relay testing completed for C1A & C1B panels.

IKE ABB

No work done

No work done

Wiring & JB fixing completed for 24 Light points. JB fixing & Wiring completed for 15 light points. JB fixing completed for 29 Light points & Wiring completed for 29 light points.

2. CABLING a) Soot blower MCC to motor (Power cable) b) Soot blower MCC to motor (Control cable) c) V&D MCC to Motor (Power cable) d) Boiler MCC to Motor (Power cable) e) Boiler MCC to Motor (Control cable) F DM PLANT a) Cabling b) Earthing c) RO System LT motors no load test FIRE WATER & MISC. MCC ROOM a) Transformer erection

CVL

9214 Mtrs 9214 Mtrs 25034 Mtrs 17759 Mtrs 3668 Mtrs

1029 Mtrs completed. No work done 12

7795 7589 4988 1082 969

84.60 82.36 19.92 6.09 26.42

Unique power Laxmi Electricals IBEUL

17 nos.

12

70.59

ABB

2 nos.

No work done

2 transformers shifted to MCC room

No of Poles No of Span Length of Span Length of Conductor 5 6 420 Mtrs 1260 Mtrs Dismantling 5 nos PSC 6 300 Mtrs 900 Mtrs New Erection 2 nos Joist