CAMTECH/99/S/SGE BI /1.0 2
UP LINE
DOUBLE LINE SECTION
DN LINE
Fig No.1
2. BASIC CONSTRUCTION
The block instrument mainly consists of two parts :
UPPER
NEEDL
E
TRAI LINE
N ON
LINE CLEA
LINE
R
CLOSE
D Upper Portion
LOWER
NEEDLE
TRAI LINE
N ON
LINE CLEA
LINE R
CLOSE
D
COMMUTATO
R
SCREW Bottom
Portion
BELL
SM’s PLUNGER
LOCK
Line Closed
Line Clear
Train On Line.
N
INDICATOR
COIL
N NP S
RP
RP
NP
S N
PERMANEN
ADJUSTABLE POLE S T
FACE ON PERMANENT MAGNET
MAGNET
Line
Train on clear
line
Line closed
DIAL
Top Indicator
Fig. No. 3
Line Closed
Line Clear
Train On Line.
2.1.4 Commutator
3. SM’s Key
Up
A Stn. B Stn.
Dn
Fig.No. 4
A & B are two Stations on double line. To dispatch
a train from Stn. ‘A’ to Stn. ‘B’, following operations are
performed :
TABLE I
S. NAME OF Byculla SR Type IRS type
N PARTS type
O
1. Door lock Mechanical Electrical Mechanical
Mechanism stick stick stick
2. Resistance of 50 ohm 48 ohm 14.8 ohm
electric lock coil
3. Working current 200 mA 250 mA 250 mA
electric lock coil
4. Resistance of bell 500 ohm 400 ohm 400 ohm
relay
5. Working current of 20 mA 25 mA 25 mA
bell relay
6. Resistance of bell 60 ohm 48 ohm 30 ohm
coil
a) Non RE area :
b) RE area :
7. EARTH
8. TESTING
9. MAINTENANCE
PERIODICITY OF OVERHAULING
A thorough periodical overhauling in Workshop is
necessary and the period shall not exceed 7 years.
T
1
V
BELL
1
LINE T
SIDE
V 2
2 TELEGRAPH
LINE V2
TO
BLOCK
C1 INSTRU
S1 P S2 -MENT
w BLOCK
EARTH
P BLOCK
EARTH
EARTH w C2 S2 LINE V 1
S1
Fig No. 5
WHERE
C1 - 4 TERMINAL CONDENSER C=10µF
TEST VOLTAGE = 1000 VOLTS
T1 - TRANSFORMER INSULATED INSIDE
P&T BOX
S1 - PROTECTIVE CHOKE R= 50 OHM
‘Z’ AT 50 HZ =40,000 OHM
TEST VOLTAGE = 600 VOLTS
S2 - PROTECTIVE CHOKE R= 40 OHM
‘Z’ AT 50 HZ =20,000 OHM
TEST VOLTAGa:\seminarE = 50 VOLTS
P - LIGHTENING ARRESTER GASEOUS
TYPE, FLASH VOLTAGE 150 VOLTS