DESCRIPCION DE PARTIDA
UND
CANTIDAD
LONGITUD
ANCHO
ALTURA
SUB - TOTAL
P.U. S/.
IMPORTE S/.
ESTRUCTURAS
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE
EQUIPOS Y HERRAMIENTAS
GLB
1.00
1.00
1,000.00
1,000.00
ALQUILER DE ANDAMIOS
GLB
1.00
1.00
1,500.00
1,500.00
M2
1.00
133.94
1.20
160.72
60.30
8,076.28
73.44
41,200.94
8.92
1,194.70
COSTO DIRECTO
53,132.64
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
1.00
61.65
1.60
98.64
0.50
16.00
1.00
61.65
0.30
1.50
12.00
18.50
1.00
16.00
0.30
4.80
ARQUITECTURA
MUROS SISTEMA DRYWALL
TABIQUE DE DRYWALL 1/2" e=12 CM
M2
1.00
133.94
1.00
61.65
1.60
98.64
0.50
16.00
1.50
12.00
1.00
61.65
0.30
18.50
1.00
16.00
0.30
4.80
CUBIERTAS
COBERTURA LIVIANA TECNOTECHO TR4 e=0.4 mm PREPINTADO
M2
1.00
1.00
561.02
61.65
9.10
561.02
PINTURAS
PINTURA LATEX 2 MANOS EN EXTERIORES M2
1.00
133.94
1.00
61.65
1.60
98.64
0.50
16.00
1.00
61.65
0.30
1.50
12.00
18.50
1.00
16.00
0.30
4.80
GG.GG (10%)
5,313.26
UTILIDAD (5%)
2,656.63
SUB-TOTAL
61,102.53
IGV (18%)
10,998.46
TOTAL
72,100.99