PRESUPUESTO TABIQUERIA DE SUPERBOARD EN ESTRUCTURA DE MACROLOM

DESCRIPCION DE PARTIDA

UND

CANTIDAD

LONGITUD

ANCHO

ALTURA

SUB - TOTAL

P.U. S/.

IMPORTE S/.

ESTRUCTURAS
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE
EQUIPOS Y HERRAMIENTAS

GLB

1.00

1.00

1,000.00

1,000.00

ALQUILER DE ANDAMIOS

GLB

1.00

1.00

1,500.00

1,500.00

M2

1.00

133.94

1.20

160.72

60.30

8,076.28

73.44

41,200.94

8.92

1,194.70

COSTO DIRECTO

53,132.64

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR

1.00

61.65

1.60

98.64

0.50

16.00

1.00

61.65

0.30

1.50

12.00
18.50

1.00

16.00

0.30

4.80

ARQUITECTURA
MUROS SISTEMA DRYWALL
TABIQUE DE DRYWALL 1/2" e=12 CM

M2

1.00

133.94

1.00

61.65

1.60

98.64

0.50

16.00

1.50

12.00

1.00

61.65

0.30

18.50

1.00

16.00

0.30

4.80

CUBIERTAS
COBERTURA LIVIANA TECNOTECHO TR4 e=0.4 mm PREPINTADO

M2

1.00
1.00

561.02
61.65

9.10

561.02

PINTURAS
PINTURA LATEX 2 MANOS EN EXTERIORES M2

1.00

133.94

1.00

61.65

1.60

98.64

0.50

16.00

1.00

61.65

0.30

1.50

12.00
18.50

1.00

16.00

0.30

4.80

GG.GG (10%)

5,313.26

UTILIDAD (5%)

2,656.63

SUB-TOTAL

61,102.53

IGV (18%)

10,998.46

TOTAL

72,100.99