FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL CORDILLERA ADMINISTRATIVE REGION (CAR) 156,205,400.00 24,600,000.00 9,140,000.00 18,145,150.00 224,050,341.00 - 34,629,449.00 10,150,000.00 3,050,000.00 90,382,000.00 14,832,200.00 1,150,000.00 3,835,000.00 374,330,460.00 964,500,000.00 PROVINCE OF ABRA 22,006,000.00 8,250,000.00 2,389,400.00 1,372,000.00 81,282,000.00 - 6,102,600.00 2,000,000.00 - 30,992,000.00 700,000.00 1,150,000.00 - 181,756,000.00 338,000,000.00 1 BANGUED 600,000.00 - - - - - - - - - - - - 11,900,000.00 12,500,000.00 ACQUISITION OF HAND TRACTOR 600,000.00 600,000.00 VARIOUS INFRA PROJECTS 11,900,000.00 11,900,000.00 REHABILITATION OF TAFT & PENARRUBIA ST. (ASPAHALT OVERLAY) - CONSTRUCTION OF CANAL -SANTIAGO & PENARRUBIA ST. - CALOT ROAD ACCESS ROAD - 2 BOLINEY 4,700,000.00 - 1,200,000.00 - - - 1,100,000.00 - - - - - - 5,500,000.00 12,500,000.00 PROCUREMENT OF TRACTORS AND MOTORIZED RICE TRESHERS 1,500,000.00 1,500,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENTS (MPDP'S) 1,400,000.00 1,400,000.00 ESTABLISHMENT OF MUNICIPAL FISH HATCHERY 1,800,000.00 1,800,000.00 ESTABLISHMENT OF MUNICIPAL NURSERY 1,200,000.00 1,200,000.00 UPGRADING OF RHU EQUIPMENTS AND INSTRUMENTS 1,100,000.00 1,100,000.00 UPGRADING AND IMPROVEMENT OF POB.TO BAOYAN RD. (INTERMITENT SECTION) 5,500,000.00 5,500,000.00 3 BUCAY 1,000,000.00 500,000.00 500,000.00 - 2,000,000.00 - - 500,000.00 - 8,000,000.00 - - - - 12,500,000.00 ORAGANIC FERTLIZER FARMING 1,000,000.00 1,000,000.00 CONSTRUCTION OF INTAKE IRRIGATION 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 IMPROVEMENT OF DRAINAGE CANAL 1,000,000.00 1,000,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 INTEGRATED LIVELIHOOD PROGRAM 500,000.00 500,000.00 VARIOUS PROJECTS 8,000,000.00 8,000,000.00 EVACUATION FACILITY - CONSTRUCTION OF DAY CARE CENTER - 4 BUCLOC - 2,300,000.00 - - 6,000,000.00 - 500,000.00 - - 3,700,000.00 - - - - 12,500,000.00 REHABILITATION OF COMMUNAL IRRIGATION SYSTEM 1,300,000.00 1,300,000.00 COMMUNAL IRRIGATION SYSTEM REPAIR 1,000,000.00 1,000,000.00 CONSTRUCTION OF DRAINAGE CANAL 3,000,000.00 3,000,000.00 FLOOD CONTROL 3,000,000.00 3,000,000.00 BIRTHING FACILITY 500,000.00 500,000.00 VARIOUS PROJECTS 3,700,000.00 3,700,000.00 PALALI FOOTDBRIDGE CONSTRUCTION - REHABILITATION OF DAY CARE CENTER - CONSTRUCTION OF FOOTBRIDGE - CONSTRUCTION OF KUYAS FOOTBRIDGE - 5 DAGUIOMAN 4,000,000.00 - - - 8,500,000.00 - - - - - - - - - 12,500,000.00 IRRIGATION PROJECTS 4,000,000.00 4,000,000.00 VARIOUS PROJECTS 8,500,000.00 8,500,000.00 FLOOD CONTROL - PROVISION OF POTABLE WATER SYSTEM - 6 DANGLAS - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 SALINTUBIG 12,500,000.00 12,500,000.00 7 DOLORES 1,500,000.00 - - - 3,360,000.00 - - - - 3,500,000.00 - - - 4,140,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,500,000.00 1,500,000.00 SAGANA AT LIGTAS N TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY CONSTRUCTION OF LEVEL I SYSTEM IN NINE (9) BARANGAYS - CABAROAN, CALUMBAYA, LIBTEC, MUDIIT, NAMIT-INGAN, PACAC, SALUCAG, TALOGTOG, TAPING 3,360,000.00 3,360,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS CONSTRUCTION OF DAY CARE CENTERS 3,500,000.00 3,500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 3,000,000.00 3,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 1,140,000.00 1,140,000.00 8 LA PAZ - - - - - - 1,100,000.00 - - - - - - 11,400,000.00 12,500,000.00 HEALTH FACILITIES AND ENHANCEMENT PROGRAM 1,100,000.00 1,100,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 11,400,000.00 11,400,000.00 9 LACUB - - - - 3,200,000.00 - 2,592,000.00 - - 2,592,000.00 - - - 4,116,000.00 12,500,000.00 TANGLEB FLOOD CONTROL/ EROSION PROTECTION 1,000,000.00 1,000,000.00 WIDENING OF SAP-AL TO TALIPUGO ACCESS 1,000,000.00 1,000,000.00 TALIPUGO POTABLE WATER SYSTEM 1,200,000.00 1,200,000.00 CONSTRUCTION OF BACAG HEALTH CENTER 1,296,000.00 1,296,000.00 CONSTRUCTION OF BUNEG HEALTH CENTER 1,296,000.00 1,296,000.00 CONSTRUCTION OF UPPER POBLACION DAYCARE CENTER 864,000.00 864,000.00 CONSTRUCTION OF TALAMPAC DAYCARE CENTER 864,000.00 864,000.00 CONSTRUCTION OF LAN-AG DAYCARE CENTER 864,000.00 864,000.00 CONCRETING OF BALAONAG TO ANGAGAN ACCESS ROAD 4,116,000.00 4,116,000.00 10 LAGANGILANG - - - - 1,400,000.00 - - - - 4,000,000.00 - - - 7,100,000.00 12,500,000.00 CONSTRUCTION OF HAND PUMP DRIVEN DEEP WELL 1,400,000.00 1,400,000.00 CONSTRUCTION OF DAY CARE CENTER 3,000,000.00 3,000,000.00 CONSTRUCTION OF SENIOR CITIZEN BLDG 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 7,100,000.00 7,100,000.00 ACCESS ROAD - ACCESS ROAD - ACCESS ROAD - 11 LAGAYAN - - - - 11,000,000.00 - - - - - - - - 1,500,000.00 12,500,000.00 SALIN TUBIG (PHASE I) 11,000,000.00 11,000,000.00 CORE LOCAL ROADS CONSTRUCTION (PHASE I) 1,500,000.00 1,500,000.00 12 LANGIDEN - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CONCRETING OF POBLACION-BAAC ACCESS ROAD 12,500,000.00 12,500,000.00 13 LICUAN-BAAY (LICUAN) - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 ACCESS ROAD - ACCESS ROAD - 14 LUBA - - - - 1,500,000.00 - - - - - - - - 11,500,000.00 13,000,000.00 REHABILITATION OF POBLACION WATER SYSTEM 1,500,000.00 1,500,000.00 LGUs AND NAME OF PROJECTS Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS PROJECTS 11,500,000.00 11,500,000.00 IMPROVEMENT OF SAY-OAN-TOQUIPA LOCAL ROAD- PHASE II - IMPROVEMENT OF LAMAGAN-PAPACA-SABNAGAN LOCAL ROAD- PHASE II - 15 MALIBCONG - 2,650,000.00 - - 5,000,000.00 - - - - 2,200,000.00 - 1,150,000.00 - 1,500,000.00 12,500,000.00 CONSTRUCTION OF BINASARAN COMMUNAL IRRIGATION SYSTEM 1,350,000.00 1,350,000.00 CONSTRUCTION OF DULAO COMMUNAL IRRIGATIO SYSTEM ( KINULUBAN SABANGAN) 1,300,000.00 1,300,000.00 CONSTRUCTION OF LAT-EY FLOOD CONTROL 1,000,000.00 1,000,000.00 CONSTRUCTION OF MATARAGAN-LUGSAD FLOOD CONTROL 1,000,000.00 1,000,000.00 CONSTRUCTION OF BAYABAS LEVEL 1 DOMESTIC WATER SYSTEM 1,000,000.00 1,000,000.00 IMPROVEMENT OF PACGUED DOMESTIC WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF ADUGAO (UMNAP) DOMESTIC WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF DULDULAO FOOT BRIDGE 1,200,000.00 1,200,000.00 CONSTRUCTION OF MABOLO (GACAB) FOOT BRIDGE 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 1,500,000.00 1,500,000.00 CONCRETING OF TARIPAN-KAWAD JUNCTION ACCESS ROAD - CONCRETING OF ACCESS ROAD ALONG BRGY.POBLACION - BUANAO ON GRID-ELECTRIFICATION(BRGY.LINE ENHANCEMENT PROGRAM (BLEP) 1,150,000.00 1,150,000.00 16 MANABO 162,000.00 - - - 4,838,000.00 - - - - - - - - 7,500,000.00 12,500,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENTS 162,000.00 162,000.00 CONSTRUCTION OF EROSION PROTECTION DIKE (RETAINING WALL) 4,838,000.00 4,838,000.00 CONCRETING OF SAPDAAN-SUNGOT ACCESS ROAD 7,500,000.00 7,500,000.00 17 PEARRUBIA - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CORE LOCAL ROAD (CONCRETING) 12,500,000.00 12,500,000.00 18 PIDIGAN 8,000,000.00 - - - - - - - - - - - - 4,500,000.00 12,500,000.00 VARIOUS PROJECTS 8,000,000.00 8,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT TRACTOR - MINFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT/MECHANIZED THRESHER - POST HARVEST FACILITIES AND EQUIPMENT MPDP - TRADING POST - CORE LOCAL ROAD/ CONSTRUCTION/ MAINTENANCE/ REHABILITATION OF ACCESS ROADS PANGTUD 1,500,000.00 1,500,000.00 CORE LOCAL ROAD/ CONSTRUCTION/ MAINTENANCE/ REHABILITATION OF ACCESS ROADS SAN DIEGO 1,000,000.00 1,000,000.00 CORE LOCAL ROAD/ CONSTRUCTION/ MAINTENANCE/ REHABILITATION OF ACCESS ROADS LASKIG 1,000,000.00 1,000,000.00 CORE LOCAL ROAD/ CONSTRUCTION/ MAINTENANCE/ REHABILITATION OF ACCESS ROADS POBLACION EAST 1,000,000.00 1,000,000.00 19 PILAR - - - - 2,500,000.00 - - - - 5,000,000.00 - - - 5,000,000.00 12,500,000.00 EXPANSION/UPGRADING OF LEVEL II WATER SUPPLY SYSTEMS INCLUDING APPROPRIATE WATER TREATMENT 2,500,000.00 2,500,000.00 REPAIR AND CONSTRUCTION OF DAY CARE CENTERS 5,000,000.00 5,000,000.00 REHABILITATION OF POBLACION-SAN JUAN WEST LOCAL ROAD 5,000,000.00 5,000,000.00 20 SALLAPADAN - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 CONCRETING OF POBLACION GANGAL TO BAZAR ACCESS ROAD (GANGAL SECTION) - CONCRETING OF MAGUYEPYEP TO SITIO BANTAY ACCESS ROAD - 21 SAN ISIDRO 1,000,000.00 - - - - - - - - - - - - 11,500,000.00 12,500,000.00 TRADING POST 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 11,500,000.00 11,500,000.00 ACCESS ROAD - ACCESS ROAD - 22 SAN JUAN - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS ROAD PROJECTS 12,500,000.00 12,500,000.00 CABCABURAO ACCESS ROAD - BAUG ACCESS ROAD - SUPIIL ACCESS ROAD - SAN JUAN-TINEG ACCESS ROAD - ABUALAN ACCESS ROAD - SILET ACCESS ROAD - 23 SAN QUINTIN - - - - 9,000,000.00 - - 1,500,000.00 - - - - - 2,000,000.00 12,500,000.00 FLOOD CONTROL 4,000,000.00 4,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT( SALINTUBIG) 5,000,000.00 5,000,000.00 LIVELIHOOD PROJECT 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE AND REHABILITATION 2,000,000.00 2,000,000.00 24 TAYUM - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 IMPROVEMENT/REHABILITATION OF ACCESS ROADS ( LEADING TO THE ST.CATHERINE PARISH CHURCH AND LEADING TO ELEMENTARY SCHOOL 12,500,000.00 12,500,000.00 25 TINEG - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 ROAD REHABILITATION 12,500,000.00 12,500,000.00 26 TUBO 1,044,000.00 - - 1,372,000.00 4,984,000.00 - - - - - - - - 5,100,000.00 12,500,000.00 CONSTRUCTION OF 2 UNITS MPDP 1,044,000.00 1,044,000.00 REPAIR OF 1 RM-TIEMPO NATIONAL HIGH SCHOOL 772,000.00 772,000.00 REPAIR OF 4 RMS-AMTUAGAN ELEMENTARY SCHOOL 600,000.00 600,000.00 VARIOUS PROJECTS 2,024,688.22 2,024,688.22 CONCRETING OF BAKABAK-LIPIT - CONCRETING OF JUNCTION-UTIP RIVER - CONSTRUCTION OF TABACDA WATER SYSTEM 1,407,640.60 1,407,640.60 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS EXTENSION OF BANTAYAN WATER SYSTEM 1,551,671.18 1,551,671.18 KILI ROAD CONCRETING 1,800,000.00 1,800,000.00 CONCRETINGG OF LAM-AG ROAD 1,300,000.00 1,300,000.00 CONCRETING OF DILONG-ATAAT ROAD 2,000,000.00 2,000,000.00 27 VILLAVICIOSA - 2,800,000.00 689,400.00 - 5,500,000.00 - 810,600.00 - - 2,000,000.00 700,000.00 - - - 12,500,000.00 IMPROVEMENT OF IRRIGATION PROJECTS 2,800,000.00 2,800,000.00 REFORESTATION OF WATERSHED 689,400.00 689,400.00 PROVISION OF POTABLE WATER SYSTEM 5,500,000.00 5,500,000.00 CONSTRUCTION OF BARANGAY BOLLISING HEALTH STATION 810,600.00 810,600.00 CONSTRUCTION OF DAY CARE CENTER 1,200,000.00 1,200,000.00 CONSTRUCTION OF ALS COMMUNITY LEARING CENTER 800,000.00 800,000.00 YAMAN PINOY 700,000.00 700,000.00 PROVINCE OF APAYAO 9,299,400.00 1,000,000.00 2,705,600.00 8,770,000.00 27,150,000.00 - 5,425,000.00 - - 13,520,000.00 7,130,000.00 - - 12,500,000.00 87,500,000.00 28 CALANASAN 529,400.00 - 2,705,600.00 - - - - - - 2,715,000.00 6,550,000.00 - - - 12,500,000.00 LIVELIHOOD ENHANCEMENT PROGRAM 529,400.00 529,400.00 NATIONAL GREENING PROGRAM 2,705,600.00 2,705,600.00 SUSTAINABLE LIVELIHOOD RPOJECT (SEA-K) 2,715,000.00 2,715,000.00 OTOP STORE EXPRESS 1,250,000.00 1,250,000.00 YAMAN PINOY 1,250,000.00 1,250,000.00 SHARED SERVICE FACILITY 2,400,000.00 2,400,000.00 INDUSTRY CLUSTERING AND DEVELOPMENT PROGRAM 1,650,000.00 1,650,000.00 29 CONNER 500,000.00 1,000,000.00 - - 5,900,000.00 - 2,000,000.00 - - 3,100,000.00 - - - - 12,500,000.00 CONSTRUCTION OF IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF 7 UNITS MULTI-PURPOSE PAVEMENT 500,000.00 500,000.00 CONSTRUCTION OF DRAINAGE CANAL LINING 1,000,000.00 1,000,000.00 CONSTRUCTION OF SPRING DEVELOPMENT PHASE II 1,000,000.00 1,000,000.00 PHASE II OF BUBOG-BUNEG FOOTBRIDGE 1,000,000.00 1,000,000.00 VARIOUS WATER PROJECTS 2,900,000.00 2,900,000.00 REHABILITATION OF WATER SYSTEM - CONSTRUCTION OF POTABLE WATER SYSTEM - CONSTRUCTION OF WATER SYSTEM PHASE II - CONSTRUCTION OF WATER SYSTEM - CONSTRUCTION OF WATER WORKS SYSTEM PHASE II - CONST.OF TALIFUGO WATER SYSTEM LEVEL II - PHASE 1 WATER SYSTEM - CONSTRUCTION OF BARANGAY HEALTH CENTER 500,000.00 500,000.00 CONSTRUCTION OF BARANGAY HEALTH CENTER PHASE 1 500,000.00 500,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION PHASE 1 500,000.00 500,000.00 CONSTRUCTION OF HEALTH CENTER 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER PHASE 1 500,000.00 500,000.00 CONSTRUCTION OF PADDIG BANAYU-PIGO HANGING BRIDGE 1,000,000.00 1,000,000.00 CONSTRUCTION OF FOOTBRIDGE PHASE II 1,000,000.00 1,000,000.00 CONSTRUCTION OF CARTBRIDGE 600,000.00 600,000.00 30 FLORA - - - 5,000,000.00 - - - - - 4,000,000.00 - - - 3,500,000.00 12,500,000.00 REPAIR AND REHAB OF SCHOOL BUILDINGS 5,000,000.00 5,000,000.00 CONSTRUCTION OF EVACUATION CENTER 4,000,000.00 4,000,000.00 CONRETING OF LOCAL ROAD (SANTAN STREET) 3,500,000.00 3,500,000.00 31 KABUGAO 2,970,000.00 - - 600,000.00 5,250,000.00 - - - - 1,180,000.00 - - - 2,500,000.00 12,500,000.00 SUSTAINABLE AGRI-BASED LIVELIHOOD AND OTHER AGRI-BUSINESS INVESTMENT BROILER PRODUCTION 570,000.00 570,000.00 SUSTAINABLE AGRI-BASED LIVELIHOOD AND OTHER AGRI-BUSINESS INVESTMENTFOOD PROCESSING TECHNOLOGY & MARKETING STRATEGIES TRAINING 900,000.00 900,000.00 SUSTAINABLE AGRI-BASED LIVELIHOOD AND OTHER AGRI-BUSINESS INVESTMENTHOG RAISING 500,000.00 500,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT 500,000.00 500,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT 500,000.00 500,000.00 REPAIR & REHABILITATION OF SCHOOL BUILDINGS 600,000.00 600,000.00 VARIOUS PROJECTS 4,400,000.00 4,400,000.00 CONSTRUCTION OF FLOOD CONTROL PROJECTS - CONSTRUCTION OF EVACUATION CENTER LENNENG, KABUGAO - CONSTRUCTION OF EVACUATION CENTER MALLAG, LUTTUCAN, KABUGAO - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 850,000.00 850,000.00 CONSTRUCTION OF FOOT BRIDGES 1,180,000.00 1,180,000.00 IMPROVEMENT OF APAYAO PROVINCIAL ACCESS ROAD 2,500,000.00 2,500,000.00 32 LUNA - - - - 6,000,000.00 - - - - - - - - 6,500,000.00 12,500,000.00 SALINTUBIG (CONSTRUCTION OF LEVEL I/II WATER SUPPLY IN 2 BARANGAYS) 6,000,000.00 6,000,000.00 CONSTRUCTION OF ROADS IN 16 BARANGAYS 6,500,000.00 6,500,000.00 33 PUDTOL 2,500,000.00 - - 3,000,000.00 3,000,000.00 - 1,975,000.00 - - 2,025,000.00 - - - - 12,500,000.00 POST HARVEST FACILITIES AND EQUIPMENT 2,500,000.00 2,500,000.00 BASIC EDUCATION FACILITIES PROGRAM 2,770,000.00 2,770,000.00 GULAYAN SA PAARALAN 230,000.00 230,000.00 SAGANA AT LIGTAS NA TUBIG (PROVISION OF POTABLE WATER SUPPLY) 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,975,000.00 1,975,000.00 PROTECTIVE SERVICE - INFRA PROJECTS 1,025,000.00 1,025,000.00 MICROENTERPRISE DEVELOPMENT TRACK-SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 34 SANTA MARCELA 2,800,000.00 - - 170,000.00 7,000,000.00 - 1,450,000.00 - - 500,000.00 580,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,800,000.00 2,800,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT - ORGANIC FERTILIZER PRODUCTION - CONSTRUCTION OF WAREHOUSE - CONSTRUCTION OF IRRIGATION CANAL - GULAYAN SA PAARALAN 170,000.00 170,000.00 CONSTRUCTION OF DEEP WELL 525,000.00 525,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS EXPANSION AND UPGRADING OF WATER SYSTEM (LEVEL 2 TO LEVEL 3) 4,475,000.00 4,475,000.00 REPAIR OF BARANGAY HEALTH STATION 900,000.00 900,000.00 RHM REPLACEMENT PROGRAM 550,000.00 550,000.00 SUPPLEMENTAL FEEDING 500,000.00 500,000.00 SME DEVELOPMENT PROJECT 580,000.00 580,000.00 PROVINCE OF BENGUET 28,800,000.00 3,000,000.00 4,045,000.00 6,003,150.00 36,350,000.00 - 13,071,850.00 5,000,000.00 1,000,000.00 21,670,000.00 2,000,000.00 - 2,835,000.00 50,225,000.00 174,000,000.00 35 ATOK 3,500,000.00 - - 1,000,000.00 4,500,000.00 - - - - - - - - 3,500,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,500,000.00 3,500,000.00 PROCUREMENT OF SHREDDER MACHINE - PROCUREMENT OF 6 UNITS HAND TRACTOR - PROCUREMENT OF 7 UNITS SHREDDER MACHINE - PROCUREMENT OF 2 UNITS SHREDDER MACHINE AND 30 UNITS MANUAL THRESHER - PROCUREMENT OF SHREDDER MACHINE - CONSTRUCTION OF TRAMLINE AT AWA-TOLIDING, TOPDAC, ATOK, BENGUET - CONSTRUCTION OF TRAMLINE AT EGANG, NAGUEY - CONSTRUCTION OF TRAMLINE AT ACASAN-BEDA, NAGUEY - REPAIR OF JAPA PRIMARY P/S & TOPDAC ELEMENTARY SCHOOL 500,000.00 500,000.00 COMPLETION OF BONGLO ELEMENTARY SCHOOL 500,000.00 500,000.00 CONSTRUCTION OF BADAYAN RETAINING WALL 500,000.00 500,000.00 CONSTRUCTION OF BAHONG RETAINING WALL 500,000.00 500,000.00 CONSTRUCTION OF FLOOD CONTROL AT BELIS 500,000.00 500,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM AT SALIDET-SAYET 500,000.00 500,000.00 REHABILITATION OF BEKES AND ANGEO WATER SYSTEM 500,000.00 500,000.00 IMPROVEMENT OF POBLACION WATERWORKS 500,000.00 500,000.00 CONSTRUCTION OF WATER RESERVIOR AT PUAL - CADIAN 500,000.00 500,000.00 CONSTRUCTION OF POTABLE WATER SUPPLY AT UPPER AND LOWER ENGLANDAD 500,000.00 500,000.00 CONSTRUCTION OF WATER SUPPLY FROM MADECLAN TO SIGIB 500,000.00 500,000.00 IMPROVEMENT ALONG LOWER ABIANG FMR (POLIS-SHOMENAY- WAGI) 500,000.00 500,000.00 IMPROVEMENT ALONG KM. 38 - LOWER ABIANG 500,000.00 500,000.00 IMPROVEMENT ALONG CUYABING - AGAS-ASEN ACCESS ROAD 500,000.00 500,000.00 IMPROVEMENT ALONG TULODAN - SAPELEWACCESS ROAD 500,000.00 500,000.00 IMPROVEMENT ALONG TULODAN - MINAC ACCESS ROAD 500,000.00 500,000.00 IMPROVEMENT ALONG CAMP 30-CALIKING PROPER ACCESS ROAD (CATINGEL SECTION) 500,000.00 500,000.00 IMPROVEMENT ALONG PAOAY - BOSLENG ACCESS ROAD 500,000.00 500,000.00 36 BAGUIO CITY 2,900,000.00 - - - 1,400,000.00 - 575,000.00 - - 6,625,000.00 - - - - 11,500,000.00 ORGANIC PRODUCTION OF FERTILIZERS FROM BIODEGRADABLE WASTE 9.1) PROVISION OF COMPOSTING BIN FOR GROUP AND SCHOOLS 9.2) CENTER FOR MARKETING OF PACKED ORGANIC FERTILIZERS 700,000.00 700,000.00 OYSTER-MUSHROOM PRODUCTION AND MARKETING 2,200,000.00 2,200,000.00 PURCHASE OF RESCUE EQUIPMENT 1,400,000.00 1,400,000.00 COMMUNITY HEALTH TEAM 5.1 )HEALTH EDUCATION AND IEC ON MATERNAL AND CHILD CARE & HEALTHY LIFESTYLE 5.2) CONTINUING EDUCATION AND PROVISION OF HEALTH CARE SERVICES 575,000.00 575,000.00 REHABILITATION/EXPANSION/UPGRADING OF AN EXISTING INFRASTRUCTURE FOR EVACUATION CENTER FOR THE CITY OF BAGUIO 3,500,000.00 3,500,000.00 UPGRADING OF SENIOR CITIZENS CENTER 2,300,000.00 2,300,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1.1 YOUTH EMPOWERMENT THROUGH SKILLS ENHANCEMENT 1.2 PARENT ENHANCEMENT FOR FAMILY HEALTH AND DEVELOPMENT 825,000.00 825,000.00 37 BAKUN - - - - - - - - - 500,000.00 - - - 12,000,000.00 12,500,000.00 IMPROVEMENT OF CABUTOTAN DAY CARE CENTER 500,000.00 500,000.00 VARIOUS PROJECTS 12,000,000.00 12,000,000.00 CONCRETING ALONG TUANGAN-LANAS ACCESS ROAD PHASE I - CONCRETING OF BA-AY TO LIWANG ACCESS ROAD - CONCRETING OF SOOKAN TO GAMBANG PROPER ACCESS ROAD - CONCRETING OF PILPIL-LABO ACCESS ROAD - IMPROVEMENT OF LUPUNAN- DALINGOAN ACCESS ROAD - 38 BOKOD 3,500,000.00 - 1,000,000.00 - 500,000.00 - 500,000.00 - - 1,000,000.00 1,000,000.00 - - 5,000,000.00 12,500,000.00 CONSTRUCTION OF ARODOS-PUGA-TOPDAC-NATIONAL ROAD TRAMLINE 1,000,000.00 1,000,000.00 CONSTRUCTION OF EMBASAY-PENGED TRAMLINE 1,000,000.00 1,000,000.00 CONSTRUCTION OF IN-ONAS - CAMANGGA-AN TRAMLINE 1,000,000.00 1,000,000.00 ORGANIC AGRICULTURE TRAININGS (MUNICIPAL WIDE) 500,000.00 500,000.00 NATIONAL GREENING PROGRAM (MUNICIPAL WIDE) 1,000,000.00 1,000,000.00 CONSTRUCTION OF BINGA-AN FLOOD CONTROL 500,000.00 500,000.00 TRAINING OF BARANGAY HEALTH EMERGENCY RESPONSE TEAM ( MUNICIPAL WIDE) 500,000.00 500,000.00 CONSTRUCTION OF POBLACION DAY CARE CENTER 1,000,000.00 1,000,000.00 YAMAN PINOY (MUNICIPAL WIDE) 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 5,000,000.00 5,000,000.00 IMPROVEMENT OF TICOP - AMBANGEG ACCESS ROAD - EXTENSION OF EKIP - POODAN ACCESS ROAD - IMPROVEMENT OF BALANAK - KAWAL ACCESS ROAD - IMPROVEMENT OF OTBONG ACCESS ROAD - IMPROVEMENT OF BILA - APONAN ACCESS ROAD - IMPROVEMENT OF MANGAKEWACCESS ROAD - IMPROVEMENT OF KANUBAS - KOLONG ACCESS ROAD - IMPROVEMENT OF SIMBONAN -ACCESS ROAD - IMPROVEMENT OF PAKAK - TALETI ACCESS ROAD - 39 BUGUIAS 2,500,000.00 - - 500,000.00 1,000,000.00 - - - - 4,500,000.00 - - - 4,000,000.00 12,500,000.00 PURCHASE OF HAND TRACTOR WITH BLADE (TILLER & SPADE) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PRODUCTION OF ORGANIC FERTILIZER 500,000.00 500,000.00 TUBER PROCESSING 500,000.00 500,000.00 PURCHASE OF SHREDDER 500,000.00 500,000.00 SWINE PRODUCTION 500,000.00 500,000.00 REPAIR OF ABATAN E/S 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 500,000.00 500,000.00 KADOYDOYAN-LINGADAN DOMESTIC WATER SUPPLY 500,000.00 500,000.00 VARIOUS CDD PROJECTS 4,500,000.00 4,500,000.00 CONSTRUCTION OF SOCIAL PROTECTION CENTER - CONSTRUCTION OF ABATAN BARANGAY HEALTH STATION - IMPROVEMENT OF JNR-POLIS-AKIKI ROAD - IMPROVEMENT OF JNR-SINIPSIP-MAALAD-NABALICONG ROAD (NANSABATAN SECTION) - CONSTRUCTION OF KIMPIT DAY CARE CENTER - VARIOUS ROAD PROJECTS 4,000,000.00 4,000,000.00 IMPROVEMENT OF JBR-KM.73-AMGALEYGUEY-GUIWEY-DALDAL ROAD (GUIWEY SECTION) - IMPROVEMENT OF GAGAHAW-PUTAK-INUMAN ROAD - IMPROVEMENT OF LAM-AYAN-BIDADAYAN ROAD - IMPROVEMENT OF JBR-LAMAGAN-PUGO ROAD (CUDAL SECTION) - IMPROVEMENT OF JBR-BANGAO-BENGBENG ROAD (LOBBAN SECTION) - IMPROVEMENT OF JNR-BEKES-ANTOPAC ROAD - IMPROVEMENT OF CALAMAGAN-MASLONG ROAD - IMPROVEMENT OF BEKES-DONTOG-BEKA ROAD - IMPROVEMENT OF LENGAOAN-BAYOYO ROAD (CADA SECTION) - IMPROVEMENT OF JBR-LOO-TABA-AO NAGOTICAN ROAD (NATA- EG SECTION) - IMPROVEMENT OF UPPER PATKIAO ROAD - 40 ITOGON - - 1,045,000.00 - 1,950,000.00 - 2,500,000.00 4,500,000.00 - 1,605,000.00 - - 900,000.00 - 12,500,000.00 NATIONAL GREENING PROGRAM 1,045,000.00 1,045,000.00 PURCHASE OF DISASTER EQUIPMENT 500,000.00 500,000.00 REHABILITATION OF WATERWORKS SYSTEM 1,450,000.00 1,450,000.00 IMPROVEMENT OF UCAB BHS 750,000.00 750,000.00 PURCHASE OF NUTRITION EQUIPMENT 750,000.00 750,000.00 REHABILITATION/IMPROVEMENT OF TOCMO BHS 1,000,000.00 1,000,000.00 BRICKS MAKING 700,000.00 700,000.00 FOOD PROCESSING (MEAT) 1,000,000.00 1,000,000.00 BAKERY BREAD & PASTRY MAKING 600,000.00 600,000.00 WEAVING (LOOM, CROCHETING, HANDWEAVING) 700,000.00 700,000.00 MUSHROOM PRODUCTION 500,000.00 500,000.00 OVERSEAS FILIPINO WORKERS REINTEGRATION PROGRAM 500,000.00 500,000.00 (DLIP) TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 SUPPORT TO SOCIAL WELFARE SERVICES 650,000.00 650,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 955,000.00 955,000.00 SKILLS TRAINING 900,000.00 900,000.00 41 KABAYAN 1,000,000.00 - - - 4,000,000.00 - - - - 2,000,000.00 - - - 5,500,000.00 12,500,000.00 CONSTRUCTION OF POST HARVEST/ MULTIPURPOSE BUILDING 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE- RIC/COOP 500,000.00 500,000.00 REHABILITATION OF BASHOY WWS 500,000.00 500,000.00 REHABILITATION OF BESOCOL WWS 500,000.00 500,000.00 RECONSTRUCTION OF KNHS-APEJAW-UNOY WWS 500,000.00 500,000.00 REHABILITATION OF TUAP WWS 500,000.00 500,000.00 REHABILITATION OF BAAY-ABUYON WWS 500,000.00 500,000.00 REHABILITATION OF PACSO PROPER WWS 500,000.00 500,000.00 REHABILITATION OF WATERWORK SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTERS (DCC) 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 606,000.00 606,000.00 SUSTAINABLE LIVELIHOOD PROJECTS 794,000.00 794,000.00 VARIOUS ROAD PROJECTS 5,500,000.00 5,500,000.00 IMPROVEMENT ALONG BALANG-DAMUT-SOKONF-TELMOD- BOKAO ACCESS ROAD - CONSTRUCTION OF ELBAG TO EYABAT TO SALIKUBAN ACCESS ROAD - IMPROVEMENT OF BAAY-MADAYAG-BALAY-LUSOD ACCESS ROAD - IMPROVEMENT OF PROPER LUSOD ACCESS ROAD - IMPROVEMENT TAWANGAN-TLNHS ACCESS ROAD - IMPROVEMENT ALONG ADAOAY-OGBO ACCESS ROAD - CONCRETING ANCHOKEY ACCESS ROAD - IMPROVEMENT ALONG CALING-BASHOY PROPER ACCESS ROAD - REHABILITATION OF COLONG-BAJEN ACCESS ROAD - IMPROVEMENT OF AKIKI-BATAN PROPER-PENGED ACCESS ROAD - 42 KAPANGAN 1,500,000.00 - 500,000.00 500,000.00 3,500,000.00 - 3,000,000.00 - 1,000,000.00 - - - - 2,500,000.00 12,500,000.00 FARM INPUT AND EQUIPMENT 500,000.00 500,000.00 HOG RAISING INDUSTRY 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 BAMBOO PROPAGATION 500,000.00 500,000.00 REPAIR OF AMPONGOT BARIO SCHOOL 500,000.00 500,000.00 CONSTRUCTION OF POSPOSOK PROPER CENTRAL FLOOD CONTROL (FC) 500,000.00 500,000.00 REHABILITATION OF TALANGEW-PAYKEK DWS 500,000.00 500,000.00 CONSTRUCTION OF MUNICIPAL EVACUATION CENTER (EC) 2,000,000.00 2,000,000.00 REHABILITATION OF TOKOK DOMESTIC WATER SUPPLY (DWS) 500,000.00 500,000.00 UPGRADING OF DATAKAN TO BIRTHING FACILITY 1,500,000.00 1,500,000.00 UPGRADING OF PONGAYAN TO BIRTHING FACILITY 1,500,000.00 1,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF COMFORT ROOM FACILITY FOR THE MUNICIPAL ECO-AGRO-TOURISM PARK 500,000.00 500,000.00 CONSTRUCTION OF THREE(3) UNIT GUEST HOUSES FOR TOURIST (INDIGENOUS) 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 2,500,000.00 2,500,000.00 IMPROVEMENT ALONG LIBO-PONGAYAN ROAD - IMPROVEMENT ALONG LABUEG- UPPER TARAO ROAD - IMPROVEMENT ALONG BELIS-CABILISAN ROAD - IMPROVEMENT ALONG CAMP-UTOPIA ROAD - IMPROVEMENT OF DONTOG-TALAKAN ROAD - 43 KIBUNGAN 1,000,000.00 - 500,000.00 2,503,150.00 1,000,000.00 - 2,996,850.00 500,000.00 - 500,000.00 - - - 3,500,000.00 12,500,000.00 PROCUREMENT OF FARM EQUIPMENTS AND POST HARVEST FACILITIES (MICROTILLER,MICROMILL,PEDAL THRESHER) 500,000.00 500,000.00 SMALL IRRIGATION PROJECT 500,000.00 500,000.00 REFORESTATION AND IMPROVEMENT OF COMMUNAL FOREST PARCELL II 500,000.00 500,000.00 REPAIR OF KIBUNGAN NATIONAL HIGH SCHOOL BUILDING AND ACQUISITION OF SCHOOL FURNITURE (SEATS) 733,150.00 733,150.00 REPAIR OF TACADANG NATIONAL HIGH SCHOOL BUILDING 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 270,000.00 270,000.00 REPAIR OF BADEO CLASSROOM 500,000.00 500,000.00 CONSTRUCTION OF FLOOD CONTROL AT MARKET SIDE, POBLACION 1,000,000.00 1,000,000.00 CAPACITY BUILDING OF HEALTH PERSONNEL (RABIES ELIMINATION, TB CONTROL, HEALTH EMERGENCY MANAGEMENT) 587,250.00 587,250.00 COMMUNITY HEALTH TEAM MOBILIZATION 264,000.00 264,000.00 NURSES DEPLOYMENT PROGRAM 1,785,600.00 1,785,600.00 RHM PLACEMENT PROGRAM 360,000.00 360,000.00 SKILLS TRAINING AND LIVELIHOOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF A SANITARY TOILET FOR THE TACADANG NATIONAL HIGH SCHOOL 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 3,500,000.00 3,500,000.00 CONCRETING ALONG ACBAB-KODAL ACCESS ROAD - IMPROVEMENT OF SAGPAT-GOD-ANG-MANAWAL (PHASE 2) - CONCRETING OF LUTAAN-NANGAMLAY-DECCAN ACCESS ROAD - IMPROVEMENT OF SIPSIP-LAMAGAN ACCESS ROAD - REHABILITATION OF NALICOB-RIVERSIDE-MASALA ACCESS ROAD - ROAD OPENING AND IMPROVEMENT ALONG PANGA-DEGWAY ACCESS ROAD - 44 LA TRINIDAD 1,000,000.00 - 1,000,000.00 - 5,500,000.00 - 1,500,000.00 - - 2,500,000.00 1,000,000.00 - - - 12,500,000.00 SMALL WATER IMPOUNDING PROJECT 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM (SEEDLING PRODUCTION AND SITE DEVELOPMENT) 1,000,000.00 1,000,000.00 PURCHASE OF RESCUE EQUIPMENT 1,500,000.00 1,500,000.00 FLOOD CONTROL 4,000,000.00 4,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,500,000.00 1,500,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER (WITH DESIGNATED ROOMS FOR EACH CASE OF WOMEN AND GIRL-CHILD ABUSES) 2,500,000.00 2,500,000.00 YAMAN PINOY / LIVELIHOOD PROGRAM/ ENTREPRENEURIAL DEVELOPMENT PROGRAM 1,000,000.00 1,000,000.00 45 MANKAYAN 1,500,000.00 500,000.00 - 500,000.00 5,500,000.00 - 500,000.00 - - 500,000.00 - - - 3,500,000.00 12,500,000.00 IMPROVEMENT OF IRRIGATION SYSTEM 500,000.00 500,000.00 AGRO FOOD PROCESSING 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 IMPROVEMENT OF ELEMENTARY SCHOOL BUILDINGS 500,000.00 500,000.00 VARIOUS PROJECTS 5,500,000.00 5,500,000.00 IMPROVEMENT OF BUSAN COMMUNITY ROAD - EROSION CONTROL/ DRAINAGE CANAL ALONG CASUBIGAN CREEK & BELOWAURORA PHASE I - EROSION CONTROL ALONG SLAUGHTER HOUSE CREEK (PHASE I) - EROSION CONTROL (RIPRAPPING) OF BALILI NHS GROUND - EROSION CONTROL (RIPRAPPING) OF CAEWE/S GROUND - CONCRETE DRAINAGE CANAL - IMPROVEMENT OF MAIN DRAINAGE CANAL - CONSTRUCTION OF TUMPACAO DRAINAGE CANAL - IMPROVEMENT OF WATER SUPPLY SYSTEM - PROVISION OF POTABLE WATER SUPPLY - PURCHASE OF HEALTH STATION FACILITIES 500,000.00 500,000.00 AGAKI WATER SOURCE PROTECTION PHASE 1 ( CANAL AND FENCING) 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 3,500,000.00 3,500,000.00 IMPROVEMENT OF COMMUNITY ACCES ROAD - IMPROVEMENT OF AMBABAG COMMUNITY ROAD - IMPROVEMENT OF DECDEC COMMUNITY ROAD - IMPROVEMENT OF GRAVEL PIT COMMUNITY ROAD - IMPROVEMENT OF DALIP-AC - AYOSIP COMMUNITY ROAD ( PHASE I) - COMMUNITY ROAD IMPROVEMENT - 46 SABLAN 3,250,000.00 - - - 3,500,000.00 - - - - 1,440,000.00 - - 735,000.00 3,575,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,250,000.00 3,250,000.00 GREENHOUSE - ORGANIC FERTILIZER PRODUCTION - FARM IMPLEMENT/TOOLS EQUIPMENT - WATERWORKS SYSTEM (SALIN TUBIG) 3,500,000.00 3,500,000.00 FOOTBRIDGE 1,440,000.00 1,440,000.00 VARIOUS ROAD PROJECTS 3,575,000.00 3,575,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS IMPROVEMENT/CONCRETING ALONG SABDANG-PAPPA COMMUNAL FOREST ACCESS ROAD - OPENING ALONG BESHING-ANENG ACCESS ROAD - LIVELIHOOD TRAINING 735,000.00 735,000.00 47 TUBA 1,650,000.00 2,500,000.00 - 800,000.00 4,000,000.00 - 500,000.00 - - - - - 1,200,000.00 1,850,000.00 12,500,000.00 TRAMLINE 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 650,000.00 650,000.00 LAMTANG-TAGADI IRRIGATION SYSTEM 1,200,000.00 1,200,000.00 LASILAS-NANGALISAN IRRIGATION SYSTEM 1,300,000.00 1,300,000.00 GULAYAN SA PAARALAN 800,000.00 800,000.00 RESCUE EQUIPMENT SETS 2,000,000.00 2,000,000.00 PIMINGGAN WATER WORKS 1,000,000.00 1,000,000.00 KABUYAO WATERWORKS 1,000,000.00 1,000,000.00 MANCHINE EQUIPMENT AND SUPPLIES 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 1,850,000.00 1,850,000.00 IMPROVEMENT OF SIPITAN-HYDRO NO. 1 ROAD - CONCRETING OF AGUYAB-GANGEB-LEBBENG ROAD - CONCRETING OF PALINA-BALINSAWANG-BAKBAKAN ROAD - LIVELIHOOD TRAINING 1,200,000.00 1,200,000.00 48 TUBLAY 5,500,000.00 - - 200,000.00 - - 1,000,000.00 - - 500,000.00 - - - 5,300,000.00 12,500,000.00 SUSTAINABLE AGRICULTURE-BASED LIVELIHOOD AND AGRI- BUSINESS INVESTMENT 2,000,000.00 2,000,000.00 AGRO-PROCESSING AND EXPANDED AGRI-BUSINESS AND PRODUCT MARKETING AND PROMOTION 1,000,000.00 1,000,000.00 POST HARVEST FACILITY 2,500,000.00 2,500,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 500,000.00 500,000.00 MICRONUTRIENT SUPPLEMENTATION 500,000.00 500,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DAY CARE CENTERS 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 5,300,000.00 5,300,000.00 REHABILITATION OF SUYOC-BA-AYAN-POSOS ROAD - REHABILITATION OF KINGSOLOMON- STO. NINO NINO - TABEYO ROAD - REHABILITATION OF AMBASSADOR-BABATAN-DUCOT ROAD - PROVINCE OF IFUGAO 29,000,000.00 3,100,000.00 - 1,500,000.00 21,250,000.00 - 4,500,000.00 1,450,000.00 1,500,000.00 4,100,000.00 500,000.00 - - 70,600,000.00 137,500,000.00 49 AGUINALDO - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS ROAD PROJECTS 12,500,000.00 12,500,000.00 NGAWNGAW-UGAD CORE LOCAL ROAD - LUPAO-NAUMAG CORE LOCAL ROAD - DAMAG BRGY. AND P/S CORE LOCAL ROAD - AWAYAN E/S CORE LOCAL ROAD - MONGGAYANG-SIFU CORE LOCAL ROAD - TAPAYA -CHALOG CORE LOCAL ROAD - CURBA LOWER POSNAAN CORE LOCAL ROAD - MAPACOPACO- HULBO CORE LOCAL ROAD - UBAO - MANAOT CORE LOCAL ROAD - YOUTH CENTER- LIBERTY CORE LOCAL ROAD - MUNKEHAR-HALAG1 W/S - BUNHIAN-ITAB NAMNAMA CORE LOCAL ROAD - BUNHIAN-ITAB NAMNAMA CORE LOCAL ROAD - BULINIT-BANAT CORE LOCAL ROAD - WOYAWOY-PANAG CORE LOCAL ROAD - 50 ALFONSO LISTA (POTIA) 5,100,000.00 - - 500,000.00 - - - 500,000.00 - 1,500,000.00 - - - 4,900,000.00 12,500,000.00 POST HARVEST FACILITY 4,600,000.00 4,600,000.00 TRADING POST 500,000.00 500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 OFWS REINTEGRATION PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF CICL - WOMEN CRISIS CENTER 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE /REHABILITATION 4,900,000.00 4,900,000.00 51 ASIPULO - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS ROAD PROJECTS 12,500,000.00 12,500,000.00 LIWON- NANGKATENGEY CORE ROAD IMPROVEMENT - PULA- CAWAYAN CORE ROAD IMPROVEMENT - 52 BANAUE 3,000,000.00 - - 500,000.00 4,000,000.00 - 3,500,000.00 - 1,500,000.00 - - - - - 12,500,000.00 VARIOUS PROJECTS 3,000,000.00 3,000,000.00 LEVELLING AND CONSTRUCTION OF MULTI-PURPOSE PAVEMENT - REHABILITATION OF COMMUNAL IRRIGATTION SYSTEM - KILYANG TRAMLINE - REHABILITATION OF COMMUNAL IRRIGATTION SYSTEM - REPAIR AND REHAB OF CLASSROOMS 500,000.00 500,000.00 VARIOUS PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF RICE TERRACES RIVER CONTROL - CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM - CONSTRUCTION FOR THE EXTENSION OF THE RHU 1,500,000.00 1,500,000.00 CONSTRUCTION OF COMMUNAL LATRINE 2,000,000.00 2,000,000.00 IMPROVEMENT OF TOURISM SITE 1,500,000.00 1,500,000.00 53 HINGYON 2,500,000.00 - - 500,000.00 1,250,000.00 - - 950,000.00 - - - - - 7,300,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 2,000,000.00 2,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 500,000.00 500,000.00 SCHOOL REHABILITATION 500,000.00 500,000.00 SALINTUBIG 1,250,000.00 1,250,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 550,000.00 550,000.00 OFWS REINTEGRATION PROGRAM 400,000.00 400,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 7,300,000.00 7,300,000.00 54 HUNGDUAN 5,000,000.00 1,500,000.00 - - 500,000.00 - - - - 1,000,000.00 - - - 4,500,000.00 12,500,000.00 REHABILITATION/ IMPROVEMENT BONGBONGNA- NABUYOK CIS 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REHABILITATION/ IMPROVEMENTLANGGA - BOKIAWAN PROPER CIS 500,000.00 500,000.00 VARIOUS AGRICULTURE PROJECTS 5,000,000.00 5,000,000.00 RESTORATION OF DAMAGED RICE TERRACES - CONSTRUCTION OF THE HUNGDUAN PUBLIC MARKET - DAYANDI-TINANGAAN WS 500,000.00 500,000.00 HAGONGHONG JUNCTION TO HALLAGAN ACCESS TRAIL IMPROVEMENT 500,000.00 500,000.00 MAGALO-BALYAGAN ACCESS TRAIL IMPROVEMENT 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 4,500,000.00 4,500,000.00 NAGACADAN - MAGGOK ROAD - HIWANG LUBOONG ACCESS ROAD - POBLACION-BANGAWAN ACCESS ROAD - BALENTIMOL-BANGAWAN ACCESS ROAD - AWA ACCESS ROAD - HAGONGHONG- TABAG-AM-IYONG ROAD - 55 KIANGAN 3,500,000.00 1,100,000.00 - - 5,000,000.00 - 1,000,000.00 - - - - - - 1,900,000.00 12,500,000.00 VARIOUS CIS PROJECTS 1,100,000.00 1,100,000.00 REHABILITATION OF UPPER POBLACION CIS - REHABILITATION OF MAPPIT CIS - REHABILITATION OF RIVERSIDE CIS - VARIOUS AGRICULTURE PROJECTS 3,500,000.00 3,500,000.00 PURCHASE OF MECHANICAL DRYER - ORGANIC FERTILIZER PRODUCTION - KIANGAN PUBLIC MARKET - SALINTUBIG FOR KIANGAN URBAN AREA 5,000,000.00 5,000,000.00 HUCAB BHS BIRTHING FACILITY 500,000.00 500,000.00 MUNGAYANG BHS BIRTHING FACILITY 500,000.00 500,000.00 VARIOUS AGRICULTURE PROJECTS 1,900,000.00 1,900,000.00 ACCESS ROAD RO MAPPIT - DUIT - CORE LOCAL ROAD AT LINGAY - CORE LOCAL ROAD AT DALLIGAN - 56 LAGAWE - 500,000.00 - - 9,000,000.00 - - - - - - - - 3,000,000.00 12,500,000.00 BAHAWIT COMMUNAL IRRIGATION SYSTEM 500,000.00 500,000.00 KITIKIT_DULLAGAN CONSTRUCTION OF CANAL 750,000.00 750,000.00 JUNCTION TO MUNICIPAL HALL CONSTRUCTION OF CANAL 500,000.00 500,000.00 LOBONG FLOOD CONTROL 750,000.00 750,000.00 CULLATOP FLOOD CONTROL 500,000.00 500,000.00 LAGAWE TUPAD PROJECT 1,000,000.00 1,000,000.00 VARIOUS WATER PROJECTS 5,500,000.00 5,500,000.00 GUIHING-AWAO-PULAWWATER SYSTEM - JUCBONG WATER SYSTEM - BURNAY WATER SYSTEM - PONGHAL WATER SYSTEM - HUYO OLILICON WATER SYSTEM - CUDOG WATER SYSTEM - BUYABUYAN WATER SYSTEM - ANGADAL MONTABIONG WATER SYSTEM - VARIOUS ROAD PROJECTS 3,000,000.00 3,000,000.00 TUPAYA-MABALANTI - DULAO CORE LOCAL ROAD - CABA- BANGA CORE LOCAL ROAD - PONGHAL-ABINUAN CORE LOCAL ROAD - 57 LAMUT 5,400,000.00 - - - 1,500,000.00 - - - - 600,000.00 - - - 5,000,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 5,400,000.00 5,400,000.00 CONSTRUCTION OF MPDP - CONSTRUCTION OF LIVESTOCK TRADING POST @ NEW MARKET COMPLEX - CONSTR'N OF COMPREHENSIVE DRAINAGE CANAL @ THE MARKET & MUN. GROUNDS 1,500,000.00 1,500,000.00 MICRO FINANCING FOR 4P'S & OTHER NHTS 600,000.00 600,000.00 CONSTRUCTION OF LOCAL ROADS 5,000,000.00 5,000,000.00 58 MAYOYAO - - - - - - - - - 500,000.00 500,000.00 - - 11,500,000.00 12,500,000.00 PROVISION OF SEED CAPITAL 500,000.00 500,000.00 CAPABILITY BUILDING TRAINING 500,000.00 500,000.00 IMPROVEMENT/REHAB OF BULHO-CHAPAY ROAD 5,750,000.00 5,750,000.00 IMPROVEMENT/REHAB OF JUNCTION-ALIMIT ROAD 5,750,000.00 5,750,000.00 59 TINOC 4,500,000.00 - - - - - - - - 500,000.00 - - - 7,500,000.00 12,500,000.00 TINOC PUBLIC MARKET COMPLETION 4,000,000.00 4,000,000.00 ENHANCEMENT OF WATER IMPOUNDING AND FARM MACHINERIES 500,000.00 500,000.00 CAPACITY DEV'T PROGRAM FOR CHILD DEV'T WORKERS 500,000.00 500,000.00 IMPUGONG -EHEB CORE LOCAL ROAD IMPROVEMENT 5,000,000.00 5,000,000.00 BEBLEY-MANAAN CORE LOCAL ROAD IMPROVEMENT 2,500,000.00 2,500,000.00 PROVINCE OF KALINGA 21,950,000.00 4,000,000.00 - 500,000.00 29,918,341.00 - 779,999.00 - 550,000.00 4,100,000.00 1,502,200.00 - 1,000,000.00 38,199,460.00 102,500,000.00 60 BALBALAN 6,000,000.00 - - - 3,900,000.00 - - - - 2,100,000.00 - - - 500,000.00 12,500,000.00 VARIOUS IRRIGATION PROJECTS 6,000,000.00 6,000,000.00 CONCRETING OF SIWAO CIS - CONCRETING OF ABKIL- AMPATALAY CIS - CONCRETING OF POKOK CIS - CONCRETING OF MASABLANG CIS - CONCRETING OF PADIG, MAGADGAD CIS - CONSTRUCTION OF MATANIWOK - SUPAK CIS - CONCRETING OF BAYOWONG CIS - CONCRETING OF BAGWANG CIS - CONCRETING OF AYYONG, MAUG-UGADIW,CALANGTOP CIS - CONCRETING OF UTAH- PIPI CIS - CONCRETING OF MALNGAT CIS - CONCRETING OF PALSANG CIS - CONCRETING OFGUNAS CIS - CONST .BONONG & BAGWANG CIS - CONST. FLOOD CONTROL 1,200,000.00 1,200,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF BOLO DRAINAGE CANAL 500,000.00 500,000.00 CONCRETING OF DRAINAGE CANAL 1,000,000.00 1,000,000.00 REHAB OF PULAY, BADUNGAN,TUKOD WATER WORK SYSTEM 600,000.00 600,000.00 REHAB OF MADALAAG-BOTOD WWS 600,000.00 600,000.00 PULAY FOOTPATH 500,000.00 500,000.00 CONCRETING OF BASSAO PATHWAY 500,000.00 500,000.00 CONCRETING OF MT. CALVARY FOOT PATH 600,000.00 600,000.00 CONST OF BONONG & TAWANG PROPER 500,000.00 500,000.00 CONCRETING OF BAKUDAN -NATIONAL ROAD 500,000.00 500,000.00 61 CITY OF TABUK (CAPITAL) - - - - 10,000,000.00 - - - - - - - - 2,500,000.00 12,500,000.00 FLOOD CONTROL 10,000,000.00 10,000,000.00 ACCESS ROADS 2,500,000.00 2,500,000.00 62 LUBUAGAN 2,950,000.00 - - 500,000.00 6,000,000.00 - - - 550,000.00 - 500,000.00 - 1,000,000.00 1,000,000.00 12,500,000.00 PROVISION OF FARM IMPLEMENT/TOOLS 500,000.00 500,000.00 MECHANICAL DRIER 1,200,000.00 1,200,000.00 PROVISION OF HAND TRACTORS 750,000.00 750,000.00 PROVISION OF FARM EQPMT/FACILITIES 500,000.00 500,000.00 REHABILITATION OF LUBUAGAN CENTRAL SCHOOL 500,000.00 500,000.00 VARIOUS PROJECTS 6,000,000.00 6,000,000.00 CONSTRUCTION OF DANGOY DRAINAGE SYSTEM - CONSTRUCTION OF POBLACION DRAINAGE SYSTEM - CONSTRUCTION OF MABILONG DRAINAGE SYSTEM - IMPROVEMENT OF TIWOD FERTILITY SPRING 550,000.00 550,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT FOR METAL WORKS 500,000.00 500,000.00 CORE ROAD SUKIAP, TANGLAG 1,000,000.00 1,000,000.00 CENTER BASED-TRAINING 500,000.00 500,000.00 COMMUNITY-BASED TRAINING 500,000.00 500,000.00 63 PASIL 500,000.00 2,000,000.00 - - 2,018,341.00 - 779,999.00 - - - 502,200.00 - - 6,699,460.00 12,500,000.00 BUCOS-BANNAWAGAN CIS 500,000.00 500,000.00 TALLALANG CIS 500,000.00 500,000.00 PUGONG CIS 500,000.00 500,000.00 AMLAWANG CIS 500,000.00 500,000.00 FOOD PRODUCTION AND PROCESSING 500,000.00 500,000.00 GALDANG WATER WORK SYSTEM 500,000.00 500,000.00 DALUPA WATER WORK SYSTEM 500,000.00 500,000.00 DANGTALAN WATER WORK SYSTEM 500,000.00 500,000.00 BALINCIAGAO NORTE WATER WORK SYSTEM 518,341.00 518,341.00 BALINCIAGAO SUR BARANGAY HEALTH STATION 779,999.00 779,999.00 POTTERY INDUSTRY 502,200.00 502,200.00 VARIOUS ROAD PROJECTS 6,699,460.00 6,699,460.00 COLAYO ACCESS ROAD - DALUPA ACCESS ROAD - SIMANGAN-PUGONG WAGAS ACCESS ROAD - PUGONG ACCESS ROAD - 64 PINUKPUK - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS ROAD PROJECTS 12,500,000.00 12,500,000.00 ROAD OPENING OF ACCESS ROAD - TAGA TO AMMACIAN SECTION - ROAD OPENING AND WIDENING OF ACCESS ROAD - TAGA - BAYAO - DUGPA TO PAKAWIT - 65 RIZAL 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 FLATBED DRIERS 5,750,000.00 5,750,000.00 DIVERSION REHABILITATION OF ANNAYUP DD 5,000,000.00 5,000,000.00 LIVELIHOOD PROJECTS 1,750,000.00 1,750,000.00 66 TANUDAN - 2,000,000.00 - - 3,000,000.00 - - - - - - - - 10,000,000.00 15,000,000.00 ALINGAG-ATAG CIS 2,000,000.00 2,000,000.00 LAY-ASAN WWS 3,000,000.00 3,000,000.00 ACCESS ROAD (PHASE 1) 10,000,000.00 10,000,000.00 67 TINGLAYAN - - - - 5,000,000.00 - - - - 2,000,000.00 500,000.00 - - 5,000,000.00 12,500,000.00 CONSTRUCTION OF OLD TINGLAYAN PWS 1,000,000.00 1,000,000.00 CONSTRUCTION OF LUPLUPA FLOOD CONTROL 1,000,000.00 1,000,000.00 CONSTRUCTION OF CHUPAKAN WATER SYSTEM, SUMADEL I 1,000,000.00 1,000,000.00 CONSTRUCTION OF BUTBUT PROPER POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 IMPROVEMENT OF TABNAC-FANGSOCAN WATER SYSTEM 1,000,000.00 1,000,000.00 IMPROVEMENT OF TINGLAYAN DAY CARE CENTERS 2,000,000.00 2,000,000.00 CAPABILITY BUILDING PROJECTS 500,000.00 500,000.00 VARIOUS PROJECTS 5,000,000.00 5,000,000.00 IMPROVEMENT OF NGIBAT ACCESS ROAD - CONCRETING OF MALLANGO ACCESS ROAD - ACCESS ROAD - PROVINCE OF MOUNTAIN PROVINCE 45,150,000.00 5,250,000.00 - - 28,100,000.00 - 4,750,000.00 1,700,000.00 - 16,000,000.00 3,000,000.00 - - 21,050,000.00 125,000,000.00 68 BARLIG 4,250,000.00 - - - 2,750,000.00 - 2,750,000.00 - - - - - - 2,750,000.00 12,500,000.00 CONSTRUCTION OF TRADING POST 2,750,000.00 2,750,000.00 FISHERY PRODUCTION AND DEVELOPMENT 1,500,000.00 1,500,000.00 REHABILITATION OF BOUMAN'S TRAIL AND DRAINAGE 2,750,000.00 2,750,000.00 CONTINUATION OF CONSTRUCTION OF RHU II AS BIRTHING FACILITY 2,750,000.00 2,750,000.00 REHABILITATION OF FIANGTIN ACCESS ROAD 2,750,000.00 2,750,000.00 69 BAUKO 4,800,000.00 - - - 2,000,000.00 - - - - 1,500,000.00 2,000,000.00 - - 2,200,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,800,000.00 4,800,000.00 COLD STORAGE VAN - CONSTRUCTION OF TRADING CENTER SHARED SERVICE FACILITY (PHASE II) - MUSHROOM PRODUCTION FACILITY - BANAO DRAINAGE 500,000.00 500,000.00 MAYAG WATERWORKS SYSTEM 500,000.00 500,000.00 BAGNEN PROPER WATERWORKS SYSTEM 1,000,000.00 1,000,000.00 ABATAN TOILET WITH DEEPWELL 1,500,000.00 1,500,000.00 SHARED SERVICE FACILITY 800,000.00 800,000.00 REHABILITATION OF SHARED SERVICE FACILITY FOR POTTERS 1,200,000.00 1,200,000.00 IMPROVEMENT OF SUMEY-ANG CORE ROAD 900,000.00 900,000.00 BAGNEN PROPER-BALINTAUGAN CORE ROAD 1,300,000.00 1,300,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 70 BESAO 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 CONSTRUCTION OF AGRO-PROCESSING FACILITY 12,500,000.00 12,500,000.00 71 BONTOC (CAPITAL) 1,500,000.00 750,000.00 - - 3,750,000.00 - 1,000,000.00 1,000,000.00 - 1,500,000.00 - - - 3,000,000.00 12,500,000.00 CONSTRUCTION OF LOFOC COMMUNAL IRRIGITION SYSTEM (CIS) TOCUCAN 750,000.00 750,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (CONSTRUCTION OF 1 FISHPOND IN EACH BARANGAY EXCEPT BARANGAY POBLACION) 1,500,000.00 1,500,000.00 CONSTRUCTION/EXPANSION/REHABILITATION/MAINTENANCE OF THE BONTOC WATERWORKS 1,250,000.00 1,250,000.00 CONSTRUCTION/IMPROVEMENT OF GUINA-ANG WATER SYSTEM 2,500,000.00 2,500,000.00 CONSTRUCTION OF BARANGAY HEALTH CENTER 500,000.00 500,000.00 ESTABLISHMENT OF ANIMAL BITE CENTER 500,000.00 500,000.00 EMERGENCY EMPLOYMENT PROGRAM 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 VARIOUS ROAD PROJECTS 3,000,000.00 3,000,000.00 CORE ROAD CONSTRUUCTION /IMPROVEMENT, BARANGAY MAINIT - CONTRUCTION /IMPROVEMENT /REHABILITATION OF CORE LOCAL ROAD, BARANGAY GUINA-ANG - 72 NATONIN - - - - 3,500,000.00 - - - - 6,000,000.00 - - - 3,000,000.00 12,500,000.00 CONSTRUCTION OF EROSION CONTROL 3,500,000.00 3,500,000.00 CONSTRUCTION OF VARIOUS PATHWAYS 3,000,000.00 3,000,000.00 REHABILITATION OF PATHWAYS 3,000,000.00 3,000,000.00 IMPROVEMENT OF BALANGAO ACCESS ROAD 3,000,000.00 3,000,000.00 73 PARACELIS 1,500,000.00 - - - 3,000,000.00 - - - - 1,500,000.00 - - - 6,500,000.00 12,500,000.00 CONSTRUCTION OF BAGSAKAN CENTER 1,500,000.00 1,500,000.00 CONSTRUCTION OF BAYONGYONG FLOOD CONTROL 1,500,000.00 1,500,000.00 CONSTRUCTION OF MINANGA-PAGGA FOOTBRIDGE 1,500,000.00 1,500,000.00 CONSTRUCTION OF APALITUD-BAGWANG FOOTBRIDGE 1,500,000.00 1,500,000.00 VARIOUS ROAD PROJECTS 6,500,000.00 6,500,000.00 REHABILITATION OF ANONAT-MULLIANG ROAD - REHABILITATION OF ASILAP-PARADI ROAD - CONSTUCTION OF ARUBANGAN-ALLINIT-GAYANG RAOD - IMPROVEMENT & CONCRETING OF MAPEPET ROAD - CONSTRUCTION OF MABATO ACCESS ROAD - CONSTRUCTION OF AMPEKLA-AMBATOTONG ROAD - 74 SABANGAN 4,000,000.00 - - - 6,000,000.00 - - - - 2,500,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF SATELLITE MARKET - IMPROVEMENT OF PUBLIC MARKET - VARIOUS PROJECTS 6,000,000.00 6,000,000.00 CONSTRUCTION/INSTALLATION OF DOMESTIC WATER SYSTEM - IMPROVEMENT OF COMMUNITY DOMESTIC WATER SUPPLY - CONSTRUCTION/INSTALLATION OF DOMESTIC WATER SYSTEM - CONSTRUCTION/INSTALLATION OF DOMESTIC WATER SYSTEM - IMPROVEMENT OF VARIOUS PATHWAYS LEADING TO POTENTIAL TOURIST SPOTS 2,500,000.00 2,500,000.00 75 SADANGA 7,500,000.00 - - - 2,000,000.00 - - - - 3,000,000.00 - - - - 12,500,000.00 LIVELIHOOD PROJECTS 500,000.00 500,000.00 VARIOUS IRRIGATION PROJECTS 7,000,000.00 7,000,000.00 PENGED AND TAKCHOR CIS - NAMAKCHAD-PALISANG-MOKLET CIS - IMPROVEMENT OF FISAK CIS - IMPROVEMENT OF CHETTAR CIS, PHASE II - IMPROVEMENT OF CANGA CIS - IMPROVEMENT OF KHAGKEY CIS - COMPLETION OF DEMANG WATER SYSTEM 2,000,000.00 2,000,000.00 LEARNING CENTER FOR THE MARGANALIZED AND DISADVANTAGE WOMEN 1,500,000.00 1,500,000.00 COMPLETION OF NABENNGAN CABLE FOOTBRIDGE 1,500,000.00 1,500,000.00 76 SAGADA - 4,500,000.00 - - 5,100,000.00 - 1,000,000.00 - - - - - - 1,900,000.00 12,500,000.00 REHABILITATION OF INPANDEY-IPIS CIS 3,000,000.00 3,000,000.00 REHABILITATION OF UPPER PANTA CIS 1,500,000.00 1,500,000.00 VARIOUS PROJECTS 3,700,000.00 3,700,000.00 PROVISION OF RESCUE EQUIPMENT - REHABILITATION OF PAK-ET FLOOD CONTROL - REHABILITATION OF DAGDAG DRAINAGE SYSTEM (LETANG/DAOANGAN) - REHABILITATION OF TABIYO FLOOD CONTROL - CONSTRUCTION OF AMPATYAY WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF DAGDAG SMALL WATER SYSTEMS LEVEL II 900,000.00 900,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 500,000.00 500,000.00 REHABILITATION OF THE SUYO (SOUTHERN BARANGAYS) BIRTHING CLINIC 500,000.00 500,000.00 REHABILITATION OF CODOCOD CORE ROAD 1,900,000.00 1,900,000.00 77 TADIAN 9,100,000.00 - - - - - - 700,000.00 - - 1,000,000.00 - - 1,700,000.00 12,500,000.00 ESTABLISHMENT OF TRADING POST 7,500,000.00 7,500,000.00 ESTABLISHMENT OF AGRI-FISHERY LIVELIHOOD PROJECTS 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER AND FEED PRODUCTION: TURNING WASTE INTO A VIABLE ENTERPRISE 600,000.00 600,000.00 LOAM WEAVING LIVELIHOOD PROGRAM 700,000.00 700,000.00 ESTABLISHMENT OF OTOP STORE EXPRESS 1,000,000.00 1,000,000.00 IMPROVEMENT OF MADANGE ACCESS ROAD 1,700,000.00 1,700,000.00 NATIONAL CAPITAL REGION (NCR) 15,223,600.00 - 1,501,000.00 9,198,000.00 8,962,900.00 - 39,297,497.75 46,674,600.00 - 100,135,670.00 12,872,300.00 - 8,783,508.00 9,328,730.00 251,977,805.75 METROPOLITAN MANILA 15,223,600.00 - 1,501,000.00 9,198,000.00 8,962,900.00 - 39,297,497.75 46,674,600.00 - 100,135,670.00 12,872,300.00 - 8,783,508.00 9,328,730.00 251,977,805.75 78 CALOOCAN CITY 1,787,000.00 - - 1,500,000.00 - - 9,259,000.00 1,523,000.00 - 9,250,000.00 - - 3,669,000.00 3,012,000.00 30,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS FOOD PRODUCTION AND LIVELIHOOD PROGRAM/ A. TRAINING ON URBAN FAMILY CONTAINER GARDENING/ B. TRAINING ON CROSS (X)-BREED CHICKEN PRODUCTION/ C. TRAINING ON NATIVE HOG PRODUCTION/ D. TRAINING ON ORNAMENTAL FISH PRODUCTION/ E. TRAINING ON MODIFIED HYDROPHONICS GARDENING/ F. DISPERSAL OF CROSS (X)-BREED CHICKEN/ G. DISPERSAL OF NATIVE HOG BREEDERS 1,787,000.00 1,787,000.00 OUT-OF-SCHOOL YOUTH (OSY) ADULT LIFE SKILLS AND DEVELOPMENT PROGRAM/ C. ALS CITYWIDE BASIC LITERACY CLASS EXPANSION PROJECT / C.1 TRAINING SEMINARS FOR TEACHERS, BASIC LITERACY FOR OUT-OF-SCHOOL YOUTHS (OSYS) AND ADULT LEARNERS / C.2 'PROCUREMENT OF SCHOOL SUPPLIES AND MATERIALS / C.3 STIPENDS/ ALLOWANCES FOR ALS TEACHERS ON RENDERED SERVICES UNDER ALS PROGRAM 1,500,000.00 1,500,000.00 NUTRITION PROGRAM / A. STRENGTHENING INFANT AND YOUNG CHILD FEEDING PROGRAM (IYCF) IMPLEMENTATION/ A.1 CONDUCT OF TRAINING ON IYCF IN EMERGENCIES/ A.2 INTENSIFY "PABASA SA NUTRISYON" AMONG NATIONAL/ A.3 HOUSEHOLD TARGETING SYSTEM (NHTS) BENEFICIARIES/ A.4 TRAINING OF ADDITIONAL VOLUNTEER BREASTFEEDING SUPPORT GROUP (BFSG)/ A.5 CONDUCT BREASTFEEDING SUPPORT GROUP GENERAL ASSEMBLY/ A.6 MENTORING/ FOLLOW-UP MEETINGS OF BFSGS/ A.7 SIMULTANEOUS BREASTMILK LETTING/ A.8 CONDUCT HEALTH EDUCATION AND PROMOTION CAMPAIGN (TALAKAYANG PANGKALUSUGAN SA PAMAYANAN)/ A.9 CONDUCT OF FOOD DEMONSTRATION ON COMPLEMENTARY FEEDING/ A.10 PROVISION OF COMPLEMENTARY FOODS 1,862,000.00 1,862,000.00 MATERNAL, NEONATAL, CHILD HEALTH, NUTRITION / A. TRAINING OF ADDITONAL COMMUNITY HEALTH TEAMS (CHTS) 581,000.00 581,000.00 MATERNAL, NEONATAL, CHILD HEALTH, NUTRITION / B. PROVISION OF NEWBORN SCREENING KITS 719,000.00 719,000.00 TUBERCULOSIS (TB) CONTROL PROGRAM / A. VITAMIN SUPPLEMENTATION OF REGISTERED TUBERCULOSIS PATIENTS 2,181,000.00 2,181,000.00 ADVOCACY CAMPAIGN ON SEXUALLY TRANSMITTED INFECTION (STI)/ HUMAN IMMUNODEFFICIENCY VIRUS (HIV) AND ACQUIRED IMMUNODEFFICENCY VIRUS 666,000.00 666,000.00 DENTAL PROGRAM / A. STRENGTHENING OF ORAL HEALTH CARE CAMPAIGN FOR CALOOCAN CHILDREN UNDER SIX YEARS OLD 3,250,000.00 3,250,000.00 BARANGAY JOB FAIRS 726,000.00 726,000.00 "TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS" (TUPAD) 797,000.00 797,000.00 FENCING AND IMPROVEMENT OF BAHAY PAG-ASA CENTER FOR CHILDREN IN CONFLICT WITH THE LAW 750,000.00 750,000.00 FINANCIAL ASSISTANCE TO INDIVIDUALS AND FAMILIES IN CRISIS SITUATION 3,000,000.00 3,000,000.00 LIVELIHOOD AND SKILLS TRAINING WITH PRODUCT DEVELOPMENT AND MARKETING AND FINANCIAL ASSISTANCE / B. PROVISION OF SEED CAPITAL ASSISTANCE TO IDENTIFIED BENEFICIARIES 2,500,000.00 2,500,000.00 PROVISION OF SEED CAPITAL (SEA K) TO DISADVANTAGED SECTORS 3,000,000.00 3,000,000.00 PROJECT TO BE DETERMINED 3,012,000.00 3,012,000.00 CONDUCT SKILLS TRAINING ON BASIC WELDING TECHNOLOGY, HAIRCUTTING AND HOUSEKEEPING, MANICURE/ PEDICURE 1,740,000.00 1,740,000.00 LIVELIHOOD AND SKILLS TRAINING WITH PRODUCT DEVELOPMENT AND MARKETING AND FINANCIAL ASSISTANCE / A. LIVELIHOOD AND SKILLS TRAINING 1,929,000.00 1,929,000.00 79 CITY OF LAS PINAS 2,393,600.00 - - 705,000.00 2,500,000.00 - 1,248,000.00 - - 3,507,670.00 - - 846,600.00 2,145,730.00 13,346,600.00 PROCUREMENT OF MOTORIZED BANCA PROJECT AND 1,500 METERS FISHNETS 1,603,200.00 1,603,200.00 TRAINING ON FISH PROCESSING AND BASIC BUSINESS MANAGEMENT 790,400.00 790,400.00 ALTERNATIVE LEARNING SYSTEM (ALS) TRAINING 705,000.00 705,000.00 PROCUREMENT OF PRESCRIBED VEHICLE FOR RESCUE AND RELIEF OPERATIONS - GENERATION 3 6X6 ALL TERRAIN TRUCK 2,500,000.00 2,500,000.00 CAPACITY BUILDING (PEER GROUP COUNSELLING FOR TEENAGE PREGNANCY AWARENESS 1,248,000.00 1,248,000.00 CONTINUOUS IMPLEMENTATION OF SUPERVISED NEIGHBORHOOD PLAY (SNP) 2,020,000.00 2,020,000.00 BUILDING CHARACTER OF CHILDREN/YOUTH THROUGH SPORTS ACTIVITIES AND PROVISION OF RECREATIONAL MATERIALS IN EVERY BARANGAY 986,800.00 986,800.00 VALUES FORMATION FOR CHILDREN PHASE 2 500,870.00 500,870.00 TRAINING ON BASIC EMERGENCY RESPONSE OF CORE GROUP VOLUNTEERS FOR THE VULNERABLE SECTORS OF THE CITY OF LAS PIAS 984,000.00 984,000.00 PROJECT TO BE DETERMINED 1,161,730.00 1,161,730.00 SKILLS TRAINING ON COMMERCIAL COOKING AND COSMETOLOGY 846,600.00 846,600.00 80 CITY OF MANILA - - - 2,500,000.00 954,000.00 - 1,604,000.00 6,000,000.00 - 18,942,000.00 - - - - 30,000,000.00 BALIK-ARAL PARA SA BATANG MANILENYO 2,500,000.00 2,500,000.00 ACQUISITION OF FLOODBOATS / (DILG: 18 BOATS) / (LGU: 7 BOATS) 954,000.00 954,000.00 CAPACITY BUILDING OF COMMUNITY HEALTH WORKERS AND PROFESSIONALS ON MAINSTREAMING DISABILITY IN VARIOUS INSTITUTIONALIZED PREVENTION AND INTERVENTION COMMUNITY HEALTH PROGRAMS 599,000.00 599,000.00 TB CONTROL 505,000.00 505,000.00 STI/HIV AND AIDS PREVENTION 500,000.00 500,000.00 VARIOUS PROJECTS 6,000,000.00 6,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TULONG PANGHANAPBUHAY PARA SA ATING DISADVANTAGED WORKERS (TUPAD) - A JOB CREATION FOR ISF - VARIOUS CDD PROJECTS 9,490,000.00 9,490,000.00 REHABILITATION OF RECEPTION AND ACTION CENTER (RAC) - BAHAY PAG-ASA FOR CICL - COMMUNITY-BASED REHABILITATION PROGRAM - LAV KO TO" CONSTRUCTION OF GROUP HANDWASHING/TOOTHBRUSHING FACILITY IN DAY CARE CENTERS (WITH COMPLETE SET OF SOAP, TOOTHBRUSH AND FLUORIDE GEL TOOTHPASTE) - VARIOUS LIVELIHOOD PROJECTS 8,000,000.00 8,000,000.00 PROYEKTONG PANGKABUHAYAN AT TAHIAN - ROLLING STORE FOR SUSTAINABLE LIVELIHOOD PROGRAM - CAPITAL ASSISTANCE (SEA-K SCHEME) - CAPACITY BUILDING: BARANGAY-BASED PROFILE UPDATING AND COMPREHENSIVE NEEDS ASSESSMENT OF PWDS 1,452,000.00 1,452,000.00 81 CITY OF MARIKINA 600,000.00 - 501,000.00 - - - 2,803,200.00 1,300,000.00 - 6,600,000.00 - - - 171,000.00 11,975,200.00 PROMOTION OF URBAN GARDENING 600,000.00 600,000.00 MASSIVE TREE PLANTING AT MARIKINA WATERSHED 501,000.00 501,000.00 ADVOCACY CAMPAIGN TO IMPROVE THE MATERNAL AND CHILD HEALTH SERVICE DELIVERY NETWORK OF MARIKINA CITY 1,380,000.00 1,380,000.00 PEST AND VECTOR CONTROL TO DECREASE THE INCIDENCE OF DISEASES 600,000.00 600,000.00 PURCHASE OF MICRO NUTRIENT POWDER FOR IDENTIFIED MALNOURISHED CHILDREN 97,800.00 97,800.00 UPDATES ON DIAGNOSIS, TREATMENT, AND MANAGEMENT OF LEPROSY 725,400.00 725,400.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 STUDENTS AND OUT-OF-SCHOOL YOUTH (OSY) ENTREPRENUERSHIP PROGRAM 1,000,000.00 1,000,000.00 PROVISION OF WHEEL CHAIR FOR THE SICK AND PERSONS WITH DISABILITY 600,000.00 600,000.00 PROVISION OF NECESSARY EQUIPMENT, BOOKS, CHAIRS AND TABLES TO ALL DAY CARE CENTERS 1,800,000.00 1,800,000.00 PROVISION OF NECESSARY EQUIPMENT, BOOKS AND OTHER SUPPLIES TO CICL'S ACTIVITY CENTER 1,200,000.00 1,200,000.00 PROVISION OF COMMUNITY KITCHEN AND TOILET FOR SELECTED THREE (3) PILOT BARANGAY EVACUATION CENTERS 1,200,000.00 1,200,000.00 PROVISION OF POLYETHYLENE BOATS WITH PADDLE TO FLOOD VULNERABLE BARANGAYS 1,800,000.00 1,800,000.00 TO BE DETERMINED 171,000.00 171,000.00 82 CITY OF MUNTINLUPA 432,000.00 - - 1,821,000.00 607,000.00 - - 4,285,000.00 - 5,355,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 432,000.00 432,000.00 TILAPIA CULTURE - POST HARVEST TECHNOLOGY TRAINING AND MASTERY OF TECHNOLOGY - ALTERNATIVE LEARNING SYSTEM 714,000.00 714,000.00 FINANCIAL LITERACY PROGRAM FOR BASIC EDUC. STUDENTS (ADULT LEARNING MODULES) 1,107,000.00 1,107,000.00 CAPACITY BUILDING FOR CSOS BY DILG 607,000.00 607,000.00 TUPAD : JOB GENERATION (CASH FOR WORK) WATER LILY GATHERING AND DRYING FOR WEAVING TROLLEY BAG, MAT, ETC. 4,285,000.00 4,285,000.00 COMMUNITY REHABILITATION PROGRAM FOR PWDS (ASSISTIVE DEVICES TO PWDS & SENIOR CITIZENS) 1,428,000.00 1,428,000.00 CONSTRUCTION OF GROUP HAND WASHING FACILITY IN DAY CARE CENTERS 1,785,000.00 1,785,000.00 SUSTAINABLE LIVELIHOOD (COMPONENT OF MORAL RECOVERY; LIVELIHOOD AND EMPLOYMENT SUPPORT TO PWDS; INCLUDING SENIOR CITIZENS AND PEDICAB DRIVERS) 2,142,000.00 2,142,000.00 83 CITY OF PASIG - - - - - - 734,500.00 2,900,000.00 - 5,625,500.00 - - 3,240,000.00 - 12,500,000.00 HEALTH EMERGENCY MANAGEMENT 734,500.00 734,500.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 570,000.00 570,000.00 RURAL WORKERS PROGRAM (TUPAD) 2,330,000.00 2,330,000.00 FOOD FOR WORK 5,625,500.00 5,625,500.00 SKILLS TRAINING PROGRAM 3,240,000.00 3,240,000.00 84 CITY OF VALENZUELA - - - - - - - 1,500,000.00 - 9,500,000.00 1,500,000.00 - - - 12,500,000.00 COMMUNITY BASED LIVELIHOOD PROGRAM (SHARED SERVICE FACILITY) VALENZUELA CITY TRICYCLE OPERATOR AND DRIVERS ASSOCIATION VULCANIZING FACILITY AND MINOR MAINTENANCE 1,500,000.00 1,500,000.00 VARIOUS PROJECTS 9,500,000.00 9,500,000.00 FINACIAL ASSISTANCE TO INDIVIDUAL AND FAMILIES IN CRISIS SITUATION - COMMUNITY BASED SUPPLEMENTAL FEEDING FOR CHILDREN AGES 6 MONTHS AND 4 YEARS OLD. - COMMUNITY BASED LIVELIHOOD PROGRAM (SHARED SERVICE FACILITY) RAG AND RUBBER MAT MAKING 1,500,000.00 1,500,000.00 85 MAKATI CITY - - - - 2,787,100.00 - - 3,928,100.00 - 2,928,000.00 2,856,800.00 - - - 12,500,000.00 REVALIDATION OF 2014 HOUSEHOLD SURVEY OF CLIMATE AND DISASTER RESILIENCE INITIATIVE (CDRI) 2,787,100.00 2,787,100.00 ICS FOR CSO 1,071,300.00 1,071,300.00 TUPAD (TULONG PANGKABUHAYAN PARA SA ATING MGA DISADVANTAGED WORKERS 1,428,400.00 1,428,400.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 1,428,400.00 1,428,400.00 SUSTAINABLE LIVELIHOOD DEVELOPMMENT 2,928,000.00 2,928,000.00 YAMAN PINOY 1,428,400.00 1,428,400.00 BASURANG YAMAN NG KABUHAYAN LABAN SA KAHIRAPAN PROGRAM 1,428,400.00 1,428,400.00 86 MALABON CITY 500,000.00 - 1,000,000.00 - - - 2,150,000.00 2,950,000.00 - 1,900,000.00 - - - 4,000,000.00 12,500,000.00 RABIES ELIMINATION - ANTI-RABIES VACCINES FOR ANIMALS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS BANTAY ILOG AT BANTAY ESTERO PARA SA KALINISAN 1,000,000.00 1,000,000.00 PROVISION OF COMPLETE PACKAGE (DRUG TESTING, MEDICAL AND HYGIENE SET) 500,000.00 500,000.00 PROVISION OF NEWBORN SCREENING KITS - MNCHN 550,000.00 550,000.00 RABIES ELIMINATION - ANTI-RABIES VACCINES FOR HUMAN 600,000.00 600,000.00 STI/HIV AND AIDS PREVENTION 500,000.00 500,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 1,450,000.00 1,450,000.00 SKILLS TRAINING FOR EMPLOYMENT 1,500,000.00 1,500,000.00 CAPACITY BUILDING 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 1,400,000.00 1,400,000.00 TO BE DETERMINED 4,000,000.00 4,000,000.00 87 MANDALUYONG CITY - - - 522,000.00 - - 1,855,005.75 1,779,000.00 - - - - - - 4,156,005.75 GREENING PROGRAM(GULAYAN SA PAARALAN) 522,000.00 522,000.00 INFANT AND YOUNG CHILD FEEDING(IYCF) - TRAINING FOR PARENT LEADERS OF NHTS 898,386.75 898,386.75 TRAINING FOR CHTS 303,369.15 303,369.15 RABIES ELIMINATION 353,249.85 353,249.85 HEALTH EMERGENCY MANAGEMENT 300,000.00 300,000.00 DOLE ADJUSTMENT MEASURES PROGRAM (DOLE-AMP) 360,000.00 360,000.00 OFW'S REINTEGRATION PROGRAM 360,000.00 360,000.00 PWD'S LIVELIHOOD FORMATION 360,000.00 360,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS(TUPAD) 699,000.00 699,000.00 88 NAVOTAS CITY 500,000.00 - - - 1,114,800.00 - 1,971,200.00 714,000.00 - 7,500,000.00 700,000.00 - - - 12,500,000.00 POST-HARVEST FACILITIES AND EQUIPMENT: PURCHASE OF MECHANICAL DRYER FOR ALAMANG AND FISH 500,000.00 500,000.00 CONSTRUCTION OF PUBLIC MARKET 1,114,800.00 1,114,800.00 MATERNAL, NEONATAL, CHILD HEALTH, AND NUTRITION (MNCHN): PURCHASE OF NEWBORN SCREENING TEST KITS 1,971,200.00 1,971,200.00 INFRATRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT: PURCHASE OF FISH NETS 714,000.00 714,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS: CONSTRUCTION OF BAHAY PAG-ASA 7,500,000.00 7,500,000.00 YAMAN PINOY: LIKAS NA YAMANG NOVATENO PROGRAM 700,000.00 700,000.00 89 PARANAQUE CITY 2,295,000.00 - - - - - 1,912,000.00 2,500,000.00 - 5,793,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION-MOTORIZED FISHING BOAT AND FISH NETS 2,295,000.00 2,295,000.00 DOH 01 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 660,000.00 660,000.00 DOH 08 STI/HIV/AIDS PREVENTION 1,252,000.00 1,252,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 2,500,000.00 2,500,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING (DSWD 05) ECCD / INSTITUTIONALIZATION SUPERVISE NEIGHBORHOOD PLAYGROUND 1,733,000.00 1,733,000.00 SEA- K PROGRAM UNDER DSWD 4,060,000.00 4,060,000.00 90 PASAY CITY - - - - - - 4,110,592.00 2,761,500.00 - 2,500,000.00 2,100,000.00 - 1,027,908.00 - 12,500,000.00 HEALTH EMERGENCY MANAGEMENT 570,592.00 570,592.00 HEALTH FACILITY ENHANCEMENT PROGRAM - UPGRADING HEALTH FACILTIES IN TERMS OF EQUIPMENT COMPLEMENTATION 835,000.00 835,000.00 HEALTH MIDWIFE PLACEMENT PROGRAM 1,080,000.00 1,080,000.00 PREVENTION AND CONTROL OF HUMAN RABIES THRU PROVISION OF POST EXPOSURE PROPHYLAREGION XIS (PEP) 500,000.00 500,000.00 TRAINING OF HEALTH PROVIDERS ON BASIC EMERGENCY OBSTETRIC AND NEWBORN CARE (BEMONC) 1,125,000.00 1,125,000.00 TUPAD 1,361,500.00 1,361,500.00 OFWREINTEGRATION PROGRAM 600,000.00 600,000.00 WIN AP 800,000.00 800,000.00 SUSTAINABLE LIVELIHOOD 1,250,000.00 1,250,000.00 SUSTAINABLE LIVELIHOOD PROGRAM EMPLOYMENT FACILITATION TRACK 1,250,000.00 1,250,000.00 YAMANG PINOY (FABRICATION AND INSTALLATION OF EC0- MODULAR PLANTERS) 2,100,000.00 2,100,000.00 TRAINING WORKS SPECIAL PROGRAM (TWSP) 1,027,908.00 1,027,908.00 91 PATEROS 2,700,000.00 - - - 500,000.00 - 2,300,000.00 4,000,000.00 - 3,000,000.00 - - - - 12,500,000.00 DUCK RAISING 1,000,000.00 1,000,000.00 BALUT PROCESSING 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 1,200,000.00 1,200,000.00 CONSTRUCTION OF DRAINAGE 500,000.00 500,000.00 DEPLOYMENT OF RN HEALS TO AUGMENT MANPOWER REQUIREMENT FOR ACHIEVING UNIVERSAL HEALTH CARE PROGRAM (2 NURSES) 43,000.00 43,000.00 DEPLOYMENT OF RURAL HEALTH MIDWIVES (RHM) TO AUGMENT MANPOWER REQUIREMENT FOR ACHIEVING UNIVERSAL HEALTH CARE PROGRAM (5 MIDWIVES) 660,000.00 660,000.00 LOCAL AIDS COUNCIL (LAC) MEETING (40 PAX) 72,000.00 72,000.00 RECRUITMENT OF COMMUNITY HEALTH TEAM MEMBERS PROVISION OF INCENTIVES (100 CHT'S) 600,000.00 600,000.00 REPRODUCTION OF CHT FORMS (A-H) FOR 100 CHT MEMBERS (4,447 HOUSEHOLDS) 600,000.00 600,000.00 TRAINING OF HEALTH PROVIDERS ON ANIMAL BITE TREATMENT AND MANAGEMENT FOR 3 DAYS (5 PARTICIPANTS) 75,000.00 75,000.00 TRAINING OF HEALTH PROVIDERS ON BASIC EMERGENCY OBSTETRIC AND NEWBORN (BEMONC) FOR 5 DAYS (10 PARTICIPANTS) 250,000.00 250,000.00 MAINTENANCE/REHAB OF ASPHALT ROAD/ ASPHALT OVERLAY 3,000,000.00 3,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGE WORKERS 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS 500,000.00 500,000.00 REPAIR OF DAY CARE CENTERS 3,000,000.00 3,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 92 QUEZON CITY - - - 1,650,000.00 - - 6,650,000.00 7,700,000.00 - 9,000,000.00 - - - - 25,000,000.00 ALTERNATIVE DELIVERY MODULE OF EDUCATION AND DROP-OUT REDUCTION PROGRAM IN DISTRICT II 1,650,000.00 1,650,000.00 MICRONUTRIENT SUPPLEMENTATION FOR LOWBIRTH WEIGHT INFANTS/STUNTED PRE-SCHOOLERS 2,650,000.00 2,650,000.00 MICRONUTRIENT SUPPLEMENTATION FOR MALNOURISHED / SEVERELY WASTED SCHOOL CHILDREN 3,000,000.00 3,000,000.00 POSITIVE APPROACH IN PROMOTING BREASTFEEDING AND BIRTH SPACING (3BS : BREASTFEEDING AND BIRTH SPACING FOR BABIES) 1,000,000.00 1,000,000.00 EMPLOYMENT FOR EDUCATION PROGRAM 1,700,000.00 1,700,000.00 COMMUNITY-BASED TEMPORARY EMPLOYMENT PROGRAM 3,000,000.00 3,000,000.00 FORMATION OF WORKERS GUILDS / TRAINING TO EMPLOYMENT (T2E) 3,000,000.00 3,000,000.00 DAY CARE CENTER SERVICES FOR THE ELDERLY/SENIOR CITIZENS 4,000,000.00 4,000,000.00 CULTURAL VALUES TRANSFORMATION: VALUE FORMATION TOWARDS RESPONSIBLE CITIZENSHIP - CASH FOR HEALTH PROGRAM FOR SENIOR CITIZEN - ADDITIONAL DEATH BENEFIT ASSISTANCE FOR ELDERLY / INDIGENT FAMILIES - FOOD FOR WORK PROGRAM FOR INDIGENT FAMILIES - ADOPTION OF INNOVATIVE DAY CARE SERVICES (ORGANIZATION OF HOME-BASED PROGRAM SUPERVISED NEIGHBORHOOD PLAY) - SUSTAINABLE COMMUNITY-BASED LIVELIHOOD ENHANCEMENT PROGRAM 3,000,000.00 3,000,000.00 MICRO-FINANCE ASSISTANCE PROGRAM 2,000,000.00 2,000,000.00 93 SAN JUAN CITY - - - 500,000.00 500,000.00 - 2,700,000.00 1,737,000.00 - 2,447,500.00 4,615,500.00 - - - 12,500,000.00 ACCREDITATION AND EQUIVALENCY PROGRAM FOR OUT-OF- SCHOOL YOUTHS 500,000.00 500,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH EMERGENCY MEDICAL SYSTEM 1,400,000.00 1,400,000.00 HFEP RENOVATION 1,300,000.00 1,300,000.00 LIVELIHOOD PROGRAM TODA-COOPERATIVE FORMATION AND ASSISTANCE TO MEMBERS 572,000.00 572,000.00 TUPAD 1,165,000.00 1,165,000.00 HOSPITALIZATION AND MEDICAL / BURIAL ASSISTANCE 1,000,000.00 1,000,000.00 MICROENTERPRISE DEVELOPMENT (PANTAWID PAMILYANG PILIPINO PROGRAM) 1,447,500.00 1,447,500.00 YAMAN PINOY - ESTABLISHMENT AND ORG OF PRODUCT FAIRS 2,115,500.00 2,115,500.00 ONE-TOWN, ONE-PRODUCT (OTOP) (REFURBISHMENT / ENHANCEMENT OF EXISTING TWO (2) BSK OTOP STORE EXPRESS) 2,500,000.00 2,500,000.00 94 TAGUIG CITY 4,016,000.00 - - - - - - 1,097,000.00 - 6,287,000.00 1,100,000.00 - - - 12,500,000.00 PWD'S * LIVELIHOOD PROGRAM FITS TO THEM (URBAN GARDENING) 574,000.00 574,000.00 * BANGKANG LUNDAY (FIBER GLASS, 20 FEET LENGTH) 739,000.00 739,000.00 * SASO CHICKEN MEAT AND EGG PRODUCTION ROLL OVER SCHEME - 10,000 CHICKS - 6 UNITS INCUBATOR (2'X2'X3', @ 100 EGG CAPACITY) 553,000.00 553,000.00 * POULTRY (ITIK) 1,150,000.00 1,150,000.00 * ORGANIC FERTILIZER MAKING 1,000,000.00 1,000,000.00 PWD'S * ASSISTANCE GIVEN TO PWDS NEEDING SPECIAL ASSISTIVE DEVICES SUCH AS SPECIAL WHEELCHAIR, HEARING AID AND SPECIAL EYE GLASSES 1,097,000.00 1,097,000.00 CHILDREN AND YOUTH * CAPABILITY BUILDING TRAINING (LEADERSHIP TRAINING, SKILLS TRAINING, VALUES FORMATION)- CHILD AND YOUTH WELFARE PROGRAM (DRUG PREVENTION, CHILD PROTECTION, CHILDRENS MONTH)) 1,400,000.00 1,400,000.00 WOMENS * KAGABAY NG BATANG AMA AT INA (COUNSELLING STYLE): TRAINING / SEMINAR (PARA-LEGAL, GENDER SENSITIVITY, OTHERS) WOMEN'S RIGHT, CAPABILITY BUILDING) 1,000,000.00 1,000,000.00 SENIOR CITIZENS * DALAW-KALINGA 761,000.00 761,000.00 URBAN POOR * COMMUNITY WATER SERVICE THRU KC-NCDDP (PURIFIED AND MINERAL BASED WATER) 2,319,000.00 2,319,000.00 VENDOR * WHOLESALING (VEGETABLE, FRUITS) * REPACKING (GARLIC, PEPPER, OTHERS) NOTE: CONSIGNMENT PROCESS, NO CAPITAL TO BE RELEASED TO INDIVIDUAL VENDOR. CAPITAL CENTRALIZED TO THE VENDOR SECTOR PROJECT MANAGEMENT 807,000.00 807,000.00 WOMENS * OTOP STORE EXPRESS (SARI-SARI STORE AND FINISHED PRODUCTS) 1,100,000.00 1,100,000.00 REGION I 371,401,042.00 17,150,000.00 8,100,000.00 175,069,650.32 368,215,089.89 - 147,099,604.65 15,575,000.00 30,220,000.00 207,533,564.79 52,188,488.00 4,680,000.00 32,311,150.00 162,554,929.35 1,592,098,519.00 ILOCOS NORTE 95,361,350.00 2,500,000.00 800,000.00 31,906,182.32 38,933,935.89 - 28,868,400.00 2,025,000.00 13,300,000.00 46,099,943.79 8,875,188.00 - 4,930,000.00 13,900,000.00 287,500,000.00 95 ADAMS 1,800,000.00 - - 594,000.00 - - 2,286,000.00 - - 540,000.00 - - 480,000.00 6,800,000.00 12,500,000.00 CONSTRUCTION OF DIVERSION DAM 1,800,000.00 1,800,000.00 REHABILITATION OF CLASSROOMS 594,000.00 594,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 1,620,000.00 1,620,000.00 UPGRADING OF RHU BUILDING 666,000.00 666,000.00 SLP-MICRO-ENTERPRISE DEVELOPMENT 540,000.00 540,000.00 VARIOUS ROAD PROJECTS 6,800,000.00 6,800,000.00 COMMERCIAL COOKING 480,000.00 480,000.00 96 BACARRA 3,550,000.00 - - - - - 500,000.00 500,000.00 - 5,550,000.00 1,900,000.00 - 500,000.00 - 12,500,000.00 IRRIGATION PROJECT S 1,450,000.00 1,450,000.00 VARIOUS AGRICULTURE PROJECTS 2,100,000.00 2,100,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS - TRADING POST - ORGANIC FERTILIZER PRODUCTION - HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 OFWS REINTEGRATION PROGRAM 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 2,800,000.00 2,800,000.00 CONSTRUCTION OF EVACUATION CENTERS 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 750,000.00 750,000.00 SHARED SERVICE FACILITY 950,000.00 950,000.00 SHARED SERVICE FACILITY 950,000.00 950,000.00 TECHNICAL VOCATION TRAINING/ COMMUNITY-BASED TRAINING; SKILLS TRAININGS ON A.) WELDING B.) BUILDING WIRING C.) SMALL ENGINE REPAIR 500,000.00 500,000.00 97 BADOC 2,200,000.00 1,000,000.00 - 1,500,000.00 3,900,000.00 - 2,900,000.00 - - 1,000,000.00 - - - - 12,500,000.00 IMP./REHAB. OF COMMUNAL IRRIGATION SYSTEMS 1,000,000.00 1,000,000.00 VARIOUS AGRICULTURE PROJECTS 1,500,000.00 1,500,000.00 PROCUREMENT OF FOUR (4) FLATBOAT WITH BEACHSEINE NETS AND COMPLETE ACCESSORIES - MULTI-PURPOSE DRYNG PAVEMENT - ORGANIC FERTILIZER PRODUCTION - FISH CAGE FARMING FOR MILKFISH AND POMPANO 700,000.00 700,000.00 REPAIR/REHABILITATION OF VARIOUS CLASSROOMS 1,500,000.00 1,500,000.00 VARIOUS PROJECTS 1,500,000.00 1,500,000.00 FLOOD CONTROL (CONSTRUCTION OF DRAINAGE SYSTEM) - PROCUREMENT OF RESCUE EQUIPMENTS - REHABILITATION/IMP. OF POTABLE WATER SYSTEM 2,400,000.00 2,400,000.00 CHT MOBILIZATION (TRAINING OF BHWS) 500,000.00 500,000.00 CONSTRUCTION OF BRGY. HEALTH STATION 2,400,000.00 2,400,000.00 REPAIR/UPGRADING OF VARIOUS DCCS 1,000,000.00 1,000,000.00 98 BANGUI 3,200,000.00 - - 1,100,000.00 3,500,000.00 - - - - 3,700,000.00 500,000.00 - - 500,000.00 12,500,000.00 SHALLOWTUBE WELL WITH WIND-POWER IRRIGATION SYSTEM AT BARUYEN 1,200,000.00 1,200,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 POST HARVEST FACILITIES- MULTI-PURPOSE DRYING PAVEMENT 1,500,000.00 1,500,000.00 REPAIR/ REHABILITATION OF SCHOOL BUILDINGS AT BANBAN HS 1,100,000.00 1,100,000.00 EXPANSION OF LEVEL III POTABLE WATER SYSTEM AT BARUYEN, DADAOR, TAGUIPORO AND UTOL 3,500,000.00 3,500,000.00 CONSTRUCTION OF EVACUATION CENTER AT BRGY. SAN LORENZO 3,200,000.00 3,200,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO ENTERPRISE DEVELOPMENT 500,000.00 500,000.00 SHARED SERVICE FACILITIES EXPANSION FOR E-BAMBOO 500,000.00 500,000.00 CONSTRUCTION OF CORE LOCAL ROAD AT BRGY. MALASIN 500,000.00 500,000.00 99 BANNA 4,500,000.00 1,500,000.00 - 1,000,000.00 4,000,000.00 - - 500,000.00 - 1,000,000.00 - - - - 12,500,000.00 REHABILITATION OF HILVACRIS, CIS 1,500,000.00 1,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,500,000.00 4,500,000.00 CONSTRUCTION OF CANAL LINING-STO. NINO NINO, CADAANAN SANGJERA - ORGANIC FERTILIZER PRODUCTION-(VERMIN CULTURE PROJ. OF BARANGAY BANGSAR & MAO) - POST-HAVEST FACILITY - PALAY MECHANICAL DRYER - DISTRIBUTION OF ASSORTED VEGETABLE SEEDS - PROVISION OF SCHOOL FURNITURE (CHAIRS) 1,000,000.00 1,000,000.00 CONST. OF COMMUNITY KITCHEN AND TOILET-MACAYEPYEP ES (EVACUATION CENTER) 500,000.00 500,000.00 FLOOD CONTROL - BRGY. CRISPINA 3,000,000.00 3,000,000.00 POTABLE WATER SYSTEM-BRGY. NAGPATAYAN 500,000.00 500,000.00 TULONG PANGHANAP BUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 SLP- MICROENTERPRISE DEVELOPMENT-4PS FED. ORG. 1,000,000.00 1,000,000.00 100 BATAC CITY - - - - 2,200,000.00 - 1,200,000.00 - - 2,300,000.00 1,200,000.00 - - 5,600,000.00 12,500,000.00 SEARCH & RESQUE EQUIPMENTS 500,000.00 500,000.00 SALINTUBIG - (SAGANA AT LIGTAS NA TUBIG SA LAHAT)-PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 SALINTUBIG - (SAGANA AT LIGTAS NA TUBIG SA LAHAT)-PROVISION OF POTABLE WATER SUPPLY 700,000.00 700,000.00 PROVISION OF VIABLE POTABLE WATER SUPPLY 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,200,000.00 1,200,000.00 CONSTRUCTION OF DAY CARE CENTER 700,000.00 700,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK 600,000.00 600,000.00 SHARED SERVICE FACILITY ON FOOD PROCESSING 1,200,000.00 1,200,000.00 CORE LOCAL ROAD CONSTRUCTION/ REHABILITATION/ MAINTENANCE 5,600,000.00 5,600,000.00 101 BURGOS 2,800,000.00 - - 2,000,000.00 - - 1,500,000.00 - 3,000,000.00 2,200,000.00 - - 1,000,000.00 - 12,500,000.00 IRRIGATION PROJECTS (CONSTRUCTION/ REPAIR OF IRRIGATION SYSTEM) 2,800,000.00 2,800,000.00 REPAIR/ REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM (ACQUISITION OF MEDICAL AND LABORATORY EQUIPMENT 1,500,000.00 1,500,000.00 VISITOR INFORMATION CENTER (INCLUDES FACILITIES FOR SOUVENIR SHOP AND COMFORT ROOMS) 3,000,000.00 3,000,000.00 UPGRADING/ REPAIR OF DAY CARE CENTERS 2,200,000.00 2,200,000.00 SKILLS TRAINING AND PROVISION OF BASIC EQUIPMENT FOR PHOTO SILK PRINTING 1,000,000.00 1,000,000.00 102 CARASI 4,000,000.00 - - 845,682.32 2,379,285.89 - 3,608,400.00 - - 704,943.79 461,688.00 - 500,000.00 - 12,500,000.00 INTEGRATED AND SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY INVESTMENT 4,000,000.00 4,000,000.00 REPAIR AND IMPROVEMENT OF CARASI NATIONAL HIGH SCHOOL AGRO-INDUSTRIAL BUILDING 845,682.32 845,682.32 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION AND REHABILITATION OF LEVEL I WATER SYSTEM 2,379,285.89 2,379,285.89 COMMUNITY HEALTH TEAM MOBILIZATION 45,000.00 45,000.00 DENGUE CONTROL PREVENTION 20,000.00 20,000.00 HEFP 340,000.00 340,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION 24,600.00 24,600.00 RABIES ELIMINATION 135,000.00 135,000.00 STI/HIV AND AIDS PREVENTION 43,800.00 43,800.00 UPGRADING/ IMPROVEMENT OF RHU 3,000,000.00 3,000,000.00 CONSTRUCTION OF VAWC, WOMEN, CICL, PWD CENTER 704,943.79 704,943.79 ESTABLISHMENT OF OTOP EXPRESS STORE 461,688.00 461,688.00 SKILLS TRAINING WITH START-UP KIT 500,000.00 500,000.00 103 CURRIMAO 8,500,000.00 - - 1,000,000.00 - - - - - 3,000,000.00 - - - - 12,500,000.00 SUSTAINABLE AGRICULTURE & FISHERY- BASED LIVELIHOOD & OTHER AGRI-FISHERY BUSINESS INVESTMENT (PROVISION OF LIVELIHOOD ASSISTANCE THRU THE INTRODUCTION OF SWINE RAISING PROJECT) 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL DEVELOPMENT (PROVISION OF 3 UNITS TRACTOR) 3,000,000.00 3,000,000.00 INFRASTRUCTURED SUPPORT TO AGRICULTURAL DEVELOPMENT (PROVISION OF MOTORIZED FISHING BOAT & FISH NETS) 4,500,000.00 4,500,000.00 BASIC EDUCATION FACILITIES (RESPAIR & REHABILITATION OF CLASSROOMS & FACILITIES) 1,000,000.00 1,000,000.00 EVACUATION FACILITY 3,000,000.00 3,000,000.00 104 DINGRAS 2,000,000.00 - - 4,500,000.00 4,500,000.00 - - - - 1,500,000.00 - - - - 12,500,000.00 PURCHASE OF POST HARVEST FACILITIES (TRACTOR, KULIGLIG, TRESHER) 2,000,000.00 2,000,000.00 NEEDED CHAIRS AND DESK/ARM CHAIRS FOR ALL SCHOOLS 500,000.00 500,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION 500,000.00 500,000.00 REPAIR, REPLACEMENT, REHABILITATION OF CLASSROOMS 3,500,000.00 3,500,000.00 SALINTUBIG PROGRAM 4,500,000.00 4,500,000.00 CONSTRUCTION OF BRGY. HEALTH STATION 1,500,000.00 1,500,000.00 105 DUMALNEG 1,000,000.00 - 800,000.00 700,000.00 - - 1,500,000.00 - 6,500,000.00 - 1,000,000.00 - - 1,000,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM: DUMALNEG AGRO-FORESTRY PROJECT 800,000.00 800,000.00 REPAIR OF CLASSROOMS AT DUMALNEG ELEMENTARY SCHOOL AND DUMALNEG NATIONAL HIGH SCHOOL 700,000.00 700,000.00 REHABILITATION OF RHU 1,500,000.00 1,500,000.00 VARIOUS TOURISM PROJECTS 6,500,000.00 6,500,000.00 IMPROVEMENT OF DUMALNEG PEOPLES PARK - IMPROVEMENT OF ECO-TRAIL FROM NAPPUD TO AG- AGAPANG FALLS - IMPROVEMENT OF SAN ISIDRO TOURIST SPOTS (AR-AROO PICNIC SITE, DARNA FALLS & SAN ISIDRO DAM) - IMPROVEMENT OF TRIBAL HALL CUM MUSEUM (TRIBAL STAGE, TRIBAL HUT, TRIBAL SESSION HALL AND GUEST HOUSE) - PROVISION OF EQUIPMENT TO DMPCI (DUMALNEG MULTI- PURPOSE COOPERATIVE, INC.) AND DWFMA (DUMALNEG WOOD FURNITURE MAKERS ASSOCIATION 1,000,000.00 1,000,000.00 CONCRETING OF PUROK ROAD 1,000,000.00 1,000,000.00 106 LAOAG CITY 2,700,000.00 - - 4,475,000.00 - - 1,000,000.00 1,025,000.00 - 2,500,000.00 800,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,700,000.00 2,700,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION: 4 WHEEL TRACTOR - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION: COMBINE HARVESTER - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION: MOTORIZED BOAT - IMPROVEMENT & EXPANSION OF THE ORGANIC FERTILIZER (VERMICULTURE & COMPOSTING) WITH THE CONSTRUCTION OF BODEGA - ESTABLISHMENT OF FISH NURSERY/BREEDING STATION (A PRIVATELY OWN FISH POND TO BE LEASED BY THE ASSISTED ORGANIZATION - REPAIR/REHABILITATION OF CLASSROOMS 3,950,000.00 3,950,000.00 PROVISION OF SCHOOL FURNITURE 525,000.00 525,000.00 > RABIES ELIMINATION > PREVENTION AND CONTROL OF RABIES THROUGH PROVISION OF POST EXPOSURE PROPHYLAREGION XIS (PEP) CATEGORY II & III BITES > TRAINING ON MANAGEMENT OF ANIMAL BITE VICTIMS 500,000.00 500,000.00 STI/HIV & AIDS PREVENTION ( VOLUNTARY COUNSELLING & TESTING, TRAINING FOR TOT & MODULAR FOR IMPLEMENTERS ON COMPREHENSIVE STI CASE MANAGEMENT, CAPACITY BUILDING ON VOLUNTARY HIV COUNSELLING & TESTING, CAPACITY BUILDING ON 100% CONDOM USE, TRAINING OF ADDITIONAL PEER EDUCATORS, WORLD AIDS DAY, AIDS CANDLELIGHT CEREMONY 500,000.00 500,000.00 NEGO KART 525,000.00 525,000.00 STARTER KITS 500,000.00 500,000.00 CONSTRUCTION OF BAHAYPAG-ASA FOR CICL 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICROENTERPRISE) 500,000.00 500,000.00 PRODUCTS DISPLAY CENTER 800,000.00 800,000.00 107 MARCOS 2,300,000.00 - - 2,250,000.00 3,500,000.00 - 1,000,000.00 - - 2,950,000.00 - - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,300,000.00 2,300,000.00 SHALLOWTUBE WELLS (STW) - HAND TRACTOR - THRESHER - MULTI-PURPOSE DRYING PAVEMENT(MPDP) - 4 WHEEL TRACTOR - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR/REHAB. OF BAGONG LIPUNAN CLASSROOM BLDG. OF MAIN CAMPUS (MARCOS NATIONAL HIGH SCHOOL 1,000,000.00 1,000,000.00 REPAIR OF SCHOOL BLDG OF BIDING ELEM.ASCHOOL 1,250,000.00 1,250,000.00 CONSTRUCTION OF DRAINAGE SYSTEM 1,000,000.00 1,000,000.00 WATER SYSTEM 2,500,000.00 2,500,000.00 MATERNITY CARE PACKAGE (MCP) EQUIPMENT WITH BACK UP GENERATOR 1,000,000.00 1,000,000.00 CONSTRUCTION OF WOMEN CENTER 2,000,000.00 2,000,000.00 REPAIR/ MAINTENANCE/ IMPROVEMENT - 18 DAY CARE CENTERS 450,000.00 450,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 SKILLS TRAINING FOR OSY 500,000.00 500,000.00 108 NUEVA ERA - - - 1,300,000.00 5,800,000.00 - 2,200,000.00 - 1,000,000.00 2,200,000.00 - - - - 12,500,000.00 IMPROVEMENT OF CLASSROOMS 1,300,000.00 1,300,000.00 VARIOUS PROJECTS 5,800,000.00 5,800,000.00 CONSTRUCTION OF BRIDGE - CONSTRUCTION OF BRIDGE - CONSTRUCTION OF BRIDGE - IMPROVEMENT OF (11) BARANGAY HEALTH STATIONS 2,200,000.00 2,200,000.00 VISITORS INFORMATION CENTER 1,000,000.00 1,000,000.00 IMPROVEMENT OF (11) DAY-CARE CENTERS 2,200,000.00 2,200,000.00 109 PAGUDPUD 6,305,350.00 - - 1,960,000.00 1,734,650.00 - 2,000,000.00 - - - 500,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 6,305,350.00 6,305,350.00 1. PROVISION OF FRUIT BEARING SEEDLINGS - 2. PROVISION OF LIVELIHOOD ASSISTANCE THROUGH THE GOAT, SWINE, CATTLE DISPERSAL - 3. MARINE RESERVE AND FISH SANCTUARIES INSTALLATION OF ARTIFICIAL REEF AND PAYAO - 4. INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION DEVELOPMENT PROVISION OF 1 UNIT BEACH SEINE WITH BANCA, 60 UNITS FISHNETS WITH COMPLETE ACCESSORIES, 3 UNITS MOTORIZED BANCA - 5. INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT ACQUISITION OF AGRICULTURAL MACHINERIES - 6. SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRIFISHERY INVESTMENTS THRU PROVISION OF TILAPIA FISHCAGES WITH FINGERLINGS AND FEEDS - 7. CONSTRUCTION OF SMALL WATER IMPOUNDING PROJECT (SWIP) - 8. ORGANIC FERTILIZER FUND ASSISTANCE FOR VERMI- COMPOSTING PROJECT - GULAYAN SA PAARALAN PROJECT 260,000.00 260,000.00 REHABILITATION OF VARIOUS SCHOOL BUILDING & ACQUISITION OF ADDITIONAL SEATS 1,200,000.00 1,200,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ ABOT-ALAM PROGRAM (ALS FOR OSY) 500,000.00 500,000.00 REHABILITATION OF VARIOUS HANGING BRIDGES (FOOT BRIDGE) 500,000.00 500,000.00 RESCUE EQUIPMENTS- PURCHASE OF PRE- DISASTER PREPAREDNESS GADGETS 734,650.00 734,650.00 SALINTUBIG PROGRAM- REHABILITATION AND EXPANSION OF LEVEL III- VIRA-VIRA WATER SYSTEM INCLUDING WATER TREATMENT SYSTEM 500,000.00 500,000.00 PROCUREMENT OF LABORATORY EQUIPMENTS 500,000.00 500,000.00 NURSE TO THE BARRIOS PROGRAM 500,000.00 500,000.00 DENGUE PREVENTION AND CONTROL PROGRAM 500,000.00 500,000.00 COMMUNITY HEALTH TEAM TRAINING 500,000.00 500,000.00 CONSTRUCTION PRODUCTION CENTER AND ACQUISITION OF PRODUCTION FACILITIES 500,000.00 500,000.00 110 PAOAY 3,360,000.00 - - 1,300,000.00 4,420,000.00 - 1,510,000.00 - - 1,910,000.00 - - - - 12,500,000.00 IRRIGATION PROJECTS 3,360,000.00 3,360,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 1,300,000.00 1,300,000.00 FLOOD CONTROL 4,420,000.00 4,420,000.00 HEALTH EMERGENCY MANAGEMENT 510,000.00 510,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 900,000.00 900,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICROENTERPRISE DEVELOPMENT TRACK 1,010,000.00 1,010,000.00 111 PASUQUIN 6,400,000.00 - - 1,500,000.00 1,500,000.00 - 500,000.00 - - 2,600,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 6,400,000.00 6,400,000.00 1. ACQUISITION OF MECHANICAL DRYER - 2. CONST. OF MULTI PURPOSE DRYING PAVEMENT - 3. PURCHASE OF TRACTORS - 4. COLD STORAGE FACILITY - 5. ORGANIC FERTILIZER PRODUCTION - 7. MARINE RESERVE AND FISH SANCTUARY - 8. TRADING POST - CLASS ROOM REPAIRS 1,220,000.00 1,220,000.00 GULAYAN SA PAARALAN 280,000.00 280,000.00 SALINTUBIG SPRING DEVELOPMENT 1,000,000.00 1,000,000.00 CAPABILITY BLDG. FOR CSOS 500,000.00 500,000.00 CHT MOBILIZATION 500,000.00 500,000.00 CONST. OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND FLUORIDE GEL TOOTHPASTE) 600,000.00 600,000.00 CONST. OF DAY CARE CENTERS 1,400,000.00 1,400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK 600,000.00 600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 112 PIDDIG 7,650,000.00 - - - - - - - - 4,000,000.00 - - 850,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 7,650,000.00 7,650,000.00 CONCRETING OF CANAL LINING OF ZANJERA SALLAGUID IRRIGATION SYSTEM - REHABILITATION OF ZANJERA DALAO COMMUNAL IRRIGATION SYSTEM - CONCRETING OF THE 300 - METER OF ZANJERA ANSAD (CALAMBEG) - VERMI COMPOSTING - GOAT RAISING PROJECT - CONSTRUCTION OF DAY CARE CENTERS 3,000,000.00 3,000,000.00 FINANCIAL ASSISTANCE FOR THE PHYSICAL RESTORATION OF THE PWDS 1,000,000.00 1,000,000.00 SKILLS TRAINING ON FOOD PROCESSING WITH START UP KIT 850,000.00 850,000.00 113 PINILI 7,430,000.00 - - 681,500.00 - - 1,500,000.00 - - 1,875,000.00 1,013,500.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 7,430,000.00 7,430,000.00 PROVISION OF LIVELIHOOD (GOAT RAISING) - PROVISION OF LIVELIHOOD ( GOAT RAISING) FOR PERSONS WITH DISABILITIES - PROVISION OF SHALLOWTUBE WELL (STW) DIESEL ENGINE W/ PUMP - REPAIR AND REHABILITATION OF EXISTING DAM AND CONSTRUCTION OF PROTECTIVE DIKE OF ZANJERA PIDENG - TARTARABANG COMMUNAL IRRIGATION SYSTEM - REPAIR AND IMPROVEMENT OF SCHOOL BUILDINGS 681,500.00 681,500.00 UPGRADING OF HEALTH FACILITIES ENHANCEMENT PROGRAM 1,500,000.00 1,500,000.00 REPAIR AND UPGRADING OF DAY CARE CENTERS(DCC'S) 900,000.00 900,000.00 ESTABLISHMENT OF OFFICE OF PERSONS WITH DISABILITIES AFFAIR (OPDA) 975,000.00 975,000.00 YAMAN PINOY - ENTERPRISE DEVELOPMENT AND VALUE- ADDING TECHNOLOGIES FOR GARLIC 1,013,500.00 1,013,500.00 114 SAN NICOLAS 5,066,000.00 - - 3,200,000.00 - - 1,214,000.00 - 800,000.00 1,720,000.00 - - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 5,066,000.00 5,066,000.00 BAMBOO INDUSTRY PROJECT - FRUIT PROCESSING PROJECT - ORGANIC FERTILIZER PRODUCTION - COMPLETION OF 1 UNIT 2-STOREY SCHOOL BUILDING 1,200,000.00 1,200,000.00 REHABILITATION & REPAIR OF CLASSROOMS 2,000,000.00 2,000,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 1,214,000.00 1,214,000.00 IMPROVEMENT OF VISITOR INFORMATION CENTER 800,000.00 800,000.00 REPAIR/ UPGRADING OF DAY CARE CENTER 500,000.00 500,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DCCS 720,000.00 720,000.00 PROVISION OF SELF-EMPLOYMENT ASSISTANCE (SEA)-K 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SKILLS LIVELIHOOD TRAINING) 500,000.00 500,000.00 115 SARRAT 4,000,000.00 - - 1,000,000.00 500,000.00 - 500,000.00 - 2,000,000.00 3,000,000.00 1,500,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,000,000.00 4,000,000.00 PURCHASE OF FARM MACHINERY(TRACTOR) - ORGANIC FERTILIZER PRODUCTION - REPAIR/ REHABILITATION OF SCHOOL BUILDING 1,000,000.00 1,000,000.00 CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 COMPLETION OF BRGY. HEALTH CENTER BUILDING 500,000.00 500,000.00 TOURISM DEVELOPMENT/ ONE STOP PASALUBONG/ SOUVENIR CENTER 2,000,000.00 2,000,000.00 UPGRADING/ IMPROVEMENT OF DAY CARE CENTERS 2,000,000.00 2,000,000.00 PROVISION OF CAPITAL TO MICRO-ENTREPRENEURS 1,000,000.00 1,000,000.00 SHARED SERVICE FACILITY 1,500,000.00 1,500,000.00 116 SOLSONA 6,700,000.00 - - 1,000,000.00 - - 2,950,000.00 - - 1,850,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 6,700,000.00 6,700,000.00 CAPABILITY BUILDING & PROJECT LABELLING FOR THE IMPROVEMENT OF VERMICOMPOST ORGANIC FERTILIZER PRODUCTION - AGRICULTURAL DEVELOPMENT PROGRAM (PROVISION OF TRACTORS TO FARMERS ORGANIZATION) - PROVISION OF POST HARVEST FACILITIES - CONSTRUCTION & REHABILITATION OF CANAL LININGS - PROVISION OF SEATS TO THE ELEMENTARY SCHOOLS 1,000,000.00 1,000,000.00 CAPABILITY BUILDING AND DEVELOPMENT OF THE COMMUNITY HEALTH TEAMS 750,000.00 750,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (PROPOSED CLUSTERED BARANGAY HEALTH STATIONS) 2,200,000.00 2,200,000.00 CONSTRUCTION OF DAY CARE CENTER BUILDINGS 1,850,000.00 1,850,000.00 117 VINTAR 9,900,000.00 - - - 1,000,000.00 - 1,000,000.00 - - - - - 600,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 9,900,000.00 9,900,000.00 IRRIGATION PROJECTS (STW, WITH EQUIPMENT/ MACHINE AND ACCESSORIES) - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTOR, PLANTER/ SEEDS, HARVESTER, ETC.) - CATTLE-RAISING PROJECT FOR IPS - SWINE/ GOAT-RAISING FOR SENIOR CITIZENS, PWDS - FOOD PROCESSING FOR OFWS/NEEDY ADULTS - MUSHROOM PRODUCTION FOR WOMEN - AGRI-FISHERY TRAINING (GOOD AGRICULTURAL PRACTICES IN MANGO, GARLIC. ONION, VEGETABLES, ETC) - ORGANIC FERTILIZER PRODUCTION - SAGANA AT LIGTAS NA TUBIG SA LAHAT(SALINTUBIG)- PROVISION OF POTABLE WATER SYSTEM) 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (CONSTRUCTION OF BARANGAY HEALTH STATION- CANAAM) 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TECHNICAL VOCATIONAL SKILLS TRAINING (SKILLS TRAINING ON DRESSMAKING WITH START-UP KIT) 600,000.00 600,000.00 ILOCOS SUR 117,787,194.00 2,500,000.00 - 52,815,968.00 97,033,904.00 - 45,791,191.00 3,250,000.00 7,100,000.00 52,409,600.00 8,076,000.00 - 7,572,150.00 30,712,512.00 425,048,519.00 118 ALILEM 8,750,000.00 - - 1,000,000.00 - - 2,000,000.00 - - - - - 750,000.00 - 12,500,000.00 VARIOUS IRRIGATION PROJECTS 8,750,000.00 8,750,000.00 A. RESTORATION OF ALILEM DAYA PUMP-GENERATED COMMUNAL IRRIGATION - B. COMPLETION OF BALAY ANITO IRRIGATION SYSTEM - C. SHALLOWTUBE WELL (STW) - CONSTRUCTION/PROVISION OF FLATBED DRYERS - ESTABLISHMENT OF ORGANIC FARMING/VERMI-COMPOSTING - REHABILITATION/REPAIR OF SCHOOL BUILDINGS-ALILEM NATIONAL HIGH SCHOOL 470,000.00 470,000.00 REHABILITATION/REPAIR OF SCHOOL BUILDINGS-PALASIPAS ELEMENTARY SCHOOL 150,000.00 150,000.00 REHABILITATION/REPAIR OF SCHOOL BUILDINGS-ANAAO ELEMENTARY SCHOOL 380,000.00 380,000.00 CONSTRUCTION OF BARANGAY HEALTH STATIONS 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) TRAININGS ON: A. CHOCOLATE CAKE MAKING AND MOLDING, B. BALOON MAKING (DESIGNING), C. PERFUME MAKING D. SOAP MAKING 750,000.00 750,000.00 119 BANAYOYO 2,900,000.00 1,000,000.00 - - 1,000,000.00 - 538,400.00 - - 1,561,600.00 - - - 5,500,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,200,000.00 1,200,000.00 CONSTRUCTION OF SMALL WATER IMPOUNDING-SITIO DAPAT 700,000.00 700,000.00 CONSTRUCTION OF SMALL WATER IMPOUNDING-TENGNGA- ELEFANTE 1,000,000.00 1,000,000.00 REHABILITATION OF IRRIGATION CANAL 1,000,000.00 1,000,000.00 SPRING WATER DEVELOPMENT (LEVEL 1) 1,000,000.00 1,000,000.00 MATERNAL AND NEWBORN CARE EQUIPMENT 538,400.00 538,400.00 CONSTRUCTION OF DAY CARE CENTER 1,011,600.00 1,011,600.00 PROVISION OF COMPLETE ECCD PROGRAM 550,000.00 550,000.00 CONCRETING OF ROADS (SINGLE LANE) 5,500,000.00 5,500,000.00 120 BANTAY 4,354,000.00 - - 1,100,000.00 - - 1,917,000.00 - - - - - - 5,129,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,354,000.00 4,354,000.00 PURCHASE OF 10 UNITS WATER PUMP - PURCHASE 15 UNITS TRESHER, 15 UNITS HAND TRACTOR WITH COMPLETE ACCESSORIES - CONSTRUCTION OF MULTI-PURPOSED DRYING PAVEMENT (5 UNITS) - PURCHASE OF SHREDDER MACHINE WITH COMPLETE MODULE FOR VERMICOMPOSTING HOUSE - REPAIR AND REHABILITATION OF SCHOOL BUILDINGS-PAING ELEMENTARY SCHOOL 550,000.00 550,000.00 REPAIR AND REHABILITATION OF SCHOOL BUILDINGS-SAN JULIAN ELEMENTARY SCHOOL 550,000.00 550,000.00 CONSTRUCTION OF BIRTHING FACILITY (PHASE II) 837,000.00 837,000.00 DEPLOYMENT OF NURSES TO RURAL BRGYS. 1,080,000.00 1,080,000.00 VARIOUS ROAD PROJECTS 5,129,000.00 5,129,000.00 CONCRETING OF BRGY. ROAD AT BRGY. AN- ANNAM(RIVERSIDE)-MALINGEB - CONCRETING OF BRGY. ROAD AT BRGY. BULAG EAST- TAGUIPORO - 121 BURGOS 500,000.00 - - 3,610,000.00 2,630,000.00 - 2,500,000.00 1,000,000.00 - 2,260,000.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 REPAIR AND REHABILITATION OF SCHOOL BUILDINGS 3,610,000.00 3,610,000.00 CONSTRUCTION OF DRAINAGE CANAL WITH COVER 1,000,000.00 1,000,000.00 REHAB OF LEVEL III 1,000,000.00 1,000,000.00 PROVISION OF POTABLE WATER SUPPLY 630,000.00 630,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 500,000.00 500,000.00 REPAIR AND REHABILITATION OF BARANGAY HEALTH STATION 1,000,000.00 1,000,000.00 TRAINING FOR HEALTH PROVIDERS 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM 500,000.00 500,000.00 LIVELIHOOD FOR MARKET VENDORS 500,000.00 500,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECT 760,000.00 760,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 CREDIT ASSISTANCE TO ARBS 500,000.00 500,000.00 122 CABUGAO 2,060,000.00 - - 2,307,500.00 628,500.00 - 2,904,000.00 - - 1,600,000.00 - - - 3,000,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,060,000.00 2,060,000.00 POST HARVEST FACILITIES & EQUIPMENT (MPDP) CONSTRUCTION OF MPDP - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - SUSTAINABLE AGRI FISHERIES BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS - FARM IMPLEMENTS / TOOLS PROVISION OF TRACTOR - MARINE RESERVES AND FISH SANCTUARIES DEVELOPMENT - REPAIR /REHABILITATION OF CLASSROOMS: A) REPAIR OF SCIENCE BUILDING, B) REPAIR OF GABALDON BUILDING, C) REPAIR OF INDUSTRIAL ARTS BLDG. D) REPAIR OF MARCOS-TYPE BLDG, E) REPAIR OF BAGONG LIPUNAN BLDG., F) REPAIR OF MARCOS-TYPE BLDG. 1,800,000.00 1,800,000.00 PROVISION OF SCHOOL FURNITURES:> 300 PCS SEATS, > 50 PCS SEATS, > 70 PCS SEATS, > 75 PCS SEATS, > 70 PCS SEATS, > 50 PCS SEATS, > 60 PCS SEATS, > 50 PCS SEATS 507,500.00 507,500.00 FLOOD CONTROL (CONSTRUCTION OF CANALS) 628,500.00 628,500.00 HEALTH FACILITY ENHANCEMENT PROGRAM: A)CONSTRUCTION OF BHS, B)CONSTRUCTION OF BHS, C)CONSTRUCTION OF BHS 2,400,000.00 2,400,000.00 RURAL HEALTH MIDWIFE PLACEMENT 504,000.00 504,000.00 VARIOUS CDD PROJECTS 1,600,000.00 1,600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS - CONSTRUCTION OF DAY CARE CENTERS-MARGAAY - PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS - CONSTRUCTION OF DAY CARE CENTERS-SABANG - PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS - CONSTRUCTION OF DAY CARE CENTERS-TUROD - VARIOUS ROAD PROJECTS 3,000,000.00 3,000,000.00 REHABILITATION / CONCRETING OF VARIOUS CORE LOCAL ROADS-2,064 SQ.M - PUG-OS/REPPAAC ROAD - REHABILITATION/CONCRETING OF VARIOUS CORE LOCAL ROADS-1,032 SQ.M - QUEZON-ALINAAY ROAD - REHABILITATION/CONCRETING OF VARIOUS CORE LOCAL ROADS-1,032 SQ.M - PILA, SITIO ABQUIR - 123 CANDON CITY 6,700,000.00 - - 572,631.00 - - 4,527,369.00 - - 700,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 6,700,000.00 6,700,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT - IMPROVEMENT OF IRRIGATION FACILITIES - SUPPORT TO ALTERNATIVE LEARNING SYSTEM (REPRODUCTION OF A & E PROGRAM MODULES) 572,631.00 572,631.00 ADDITIONAL RN HEALS AND RHMPP DEPLOYMENT FOR THE CHO 528,000.00 528,000.00 CONSTRUCTION OF BARANGAY HEALTH STATIONS 2,400,000.00 2,400,000.00 PREVENTION & CONTROL OF HUMAN RABIES THROUGH PROVISION OF POST EXPOSURE PROPHYLAREGION XIS (PEP) 500,000.00 500,000.00 UPGRADING OF CHO IN TERMS OF EQUIPMENT FOR OPB, MCP & TB DOTS 1,099,369.00 1,099,369.00 CREDIT ASSISTANCE PROGRAM FOR ARC COOPERATIVES 700,000.00 700,000.00 124 CAOAYAN 4,900,000.00 - - 600,000.00 3,676,500.00 - - - 600,000.00 600,000.00 600,000.00 - 723,500.00 800,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,900,000.00 4,900,000.00 SUSTAINABLE AGIRI-FISHERY BASED LIVELIHOOD & OTHER AGRI FISHERY BUSINESS INVESTMENT: A. PROVISION OF FISHING GEARS, NETS AND MOTORBOATS - SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT: - PROVISION OF HIGH YIELDING VARIETY AND CERTIFIED SEEDS - SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT: - 6 UNIT TRACTOR - SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT: - 6 RICE THRESHER - ORGANIC FERTILIZER PRODUCTION - AGRI-FISHERY TRAININGS WITH FACILITIES AND EQUIPMENT - POST HARVEST FACILITIES & EQUIPMENTS - REPAIR/REHABILITATION OF CLASSROOMS 600,000.00 600,000.00 VARIOUS PROJECTS 3,676,500.00 3,676,500.00 FLOOD CONTROL PROJECT - DRAINANGE CANAL - FLOOD CONTROL PROJECT - SEA WALL - CONSTRUCTION OF LEVEL II WATER SUPPLY - TOURISM DEVELOPMENT (ESTABLISHMENT OF ONE BARANGAY ONE PRODUCT INCLUDING AMENITIES) 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 600,000.00 600,000.00 UPGRADING OF HANDY CRAFT/CROP PRODUCTION INCLUDING EQUIPMENTS 600,000.00 600,000.00 REPAIR/REHABILITATION OF ROAD 800,000.00 800,000.00 TECHNICAL VOCATIONAL SKILLS TRAINING 723,500.00 723,500.00 125 CERVANTES 6,500,000.00 - - 1,000,000.00 1,000,000.00 - - - 2,000,000.00 - - - 2,000,000.00 - 12,500,000.00 VARIOUS IRRIGATION PROJECTS 6,500,000.00 6,500,000.00 CONSTRUCTION OF COMMUNAL IRRIGATION PROJECT AT ASIYEY, INGAN, BOO, AMGUEYGUEY & KAYAN - REHABILITATION OF IRRIGATION SYSTEM AT TICOB - REHABILITATION OF COMILLAS (LOWER) COMMUNAL IRRIGATION SYSTEM - REPAIR OF CLASSROOM BUILDING 500,000.00 500,000.00 REPAIR OF CLASSROOM BUILDING 500,000.00 500,000.00 REHABILITATION OF POTABLE WATER SYSTEMS 1,000,000.00 1,000,000.00 ESTABLISHMENT OF PICNIC GROUNDS AND VIEWDECKS INCLUDING VISITORS INFORMATION CENTER 2,000,000.00 2,000,000.00 SKILLS TRAINING ON: A) BAMBOOCRAFT (BAHAY-KUBO, AGRICULTURAL WOVEN BASKET, SOUVENIR ITEMS), B) WELDING & IRON WORKS, C) FURNITUTE MAKING, D) TAILORING/DRESSMAKING, E) REFRIGERATION & AIR CONDITIONING, F) ELECTRONICS TECHNICIAN, G) ORGANIC FARMING,H) COMPUTER REPAIR 2,000,000.00 2,000,000.00 126 GALIMUYOD 4,500,000.00 - - 2,950,000.00 - - 2,211,369.00 - - 2,388,000.00 - - 498,650.00 - 12,548,019.00 VARIOUS AGRICULTURE PROJECTS 4,500,000.00 4,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - TRADING POST - BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 2,950,000.00 2,950,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,211,369.00 2,211,369.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 796,000.00 796,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 796,000.00 796,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 796,000.00 796,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SKILLS TRAINING & SEED CAPITAL ASSISTANCE) 498,650.00 498,650.00 127 GREGORIO DEL PILAR 4,300,000.00 - - - - - 1,100,000.00 - - 1,600,000.00 - - - 5,500,000.00 12,500,000.00 TRAMLINES 4,300,000.00 4,300,000.00 PURCHASE OF RHU EQUIPMENTS - OPB, MCP & TB DOTS (3 IN 1) 1,100,000.00 1,100,000.00 CONSTRUCTION OF DCCS 1,600,000.00 1,600,000.00 CORE LOCAL ROAD REHABILITATION 5,500,000.00 5,500,000.00 128 LIDLIDDA 2,000,000.00 - - 1,800,000.00 3,000,000.00 - 2,500,000.00 750,000.00 - 1,750,000.00 700,000.00 - - - 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF BARACBAC IRRIGATION DAM 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS. PROVISION OF SCHOOL FURNITURE 1,800,000.00 1,800,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,500,000.00 2,500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 750,000.00 750,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,750,000.00 1,750,000.00 YAMAN PINOY 700,000.00 700,000.00 129 MAGSINGAL 2,000,000.00 - - 2,200,000.00 3,000,000.00 - 2,300,000.00 - - 3,000,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,000,000.00 2,000,000.00 POST HARVEST FACILITIES - FISH SANCTUARIES - ORGANIC FERTILIZER PRODUCTION - REPAIR/REHABILITATION OF CLASSROOMS 2,200,000.00 2,200,000.00 CONSTRUCTION OF FOOTBRIDGE 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,300,000.00 2,300,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECT . REPAIR/UPGRADING OF DAY CARE CENTERS 3,000,000.00 3,000,000.00 130 NAGBUKEL 3,000,000.00 - - 2,500,000.00 5,261,000.00 - 639,000.00 - - 1,100,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,000,000.00 3,000,000.00 ACQUISITION OF FARM MECHANIZATION EQUIPMENTS - POST HARVEST FACILITIES AND EQUIPMENT - DRILLING AND INSTALLATION OF SHALLOWTUBE WELLS - AGRO PROCESSING FACILITY - REHABILITATION OF COMPUTER BUILDING 1,500,000.00 1,500,000.00 REPAIR/REHABILITATION OF TWO CLASSROOM ELEMENTARY SCHOOL BUILDING 500,000.00 500,000.00 REPAIR OF ROOFING CEILING, WINDOWS, & PARTITIONS OF GRADE IV & V ROOMS 500,000.00 500,000.00 CONSTRUCTION OF DRAINAGE SYSTEM 800,000.00 800,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 4,461,000.00 4,461,000.00 STI/HIV AND AIDS PREVENTION PROGRAM 639,000.00 639,000.00 CONSTRUCTION OF OTOP BUILDING 1,100,000.00 1,100,000.00 131 NARVACAN 3,000,000.00 - - 2,970,000.00 3,000,000.00 - - - - 2,730,000.00 - - 800,000.00 - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT : 4 - WHEEL TRACTOR (L - 3608) 1,200,000.00 1,200,000.00 POST HARVEST FACILITIES AND EQUIPMENT: MECHANICAL 1,800,000.00 1,800,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION /IMPROVEMENT OF OLD STONE BUILDING 600,000.00 600,000.00 BASIC EDUCATION FACILITIES: UPGRADING OF ANUNCIACION BLDG. NNCHS 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: REPAIR/ REHABILITATION OF CLASSROOMS 920,000.00 920,000.00 REPAIR/REHABILITATION/IMPROVEMENT OF OLD STONE BUILDING 950,000.00 950,000.00 VARIOUS PROJECTS 3,000,000.00 3,000,000.00 CONSTRUCTION OF EVACUATION CENTER - FLOOD CONTROLS - PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS: DAY CARE REPAIR/UPGRADING 1,054,000.00 1,054,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK: SUSTAINABLE LP-TRUCK 2 FOR MICRO - ENTERPRISE 1,676,000.00 1,676,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK: SKILLS TRAINING 800,000.00 800,000.00 132 QUIRINO 4,000,000.00 - - 3,000,000.00 4,500,000.00 - - - - 1,000,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,000,000.00 4,000,000.00 CONCRETING OF MALBAN IRRIGATION - CAYUS-BILWIGAN IRRIGATION CANAL AND CONSTRUCTION OF SWIP - IMPROVEMENT OF AMMABENG IRRIGATION - IMPROVEMENT OF GANGA IRRIGATION DAM & CANAL - SALINGAT-BUANOS IRRIGATION DAM - BOB-OCOC IRRIGATION DAM AND CANAL - PROCUREMENT OF FARM TOOLS (DRUM SEEDERS) - REPAIR OF LAMAG ELEMENTARY SCHOOL BLDG. 500,000.00 500,000.00 REPAIR OF MALIDEG ELEMENTARY SCHOOL BLDG. 500,000.00 500,000.00 REPAIR OF NAMITPIT ELEMENTARY SCHOOL BUILDING 500,000.00 500,000.00 REPAIR OF PATIACAN ELEMENTARY SCHOOL BUILDING 500,000.00 500,000.00 REPAIR OF QUIRINO CENTRAL SCHOOL BUILDING 500,000.00 500,000.00 REPAIR OF SUAGAYAN ELEMENTARY SCHOOL 500,000.00 500,000.00 VARIOUS PROJECTS 4,500,000.00 4,500,000.00 BANOEN FLOOD CONTROL - INAWEY FLOOD CONTROL - CONSTRUCTION OF ITEB FLOOD CONTROL - LINGGAWA FLOOD CONTROL - PATUNGCALEO FLOOD CONTROL - CONSTRUCTION OF MABBO FLOOD CONTROL - SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 133 SALCEDO - - - 1,300,000.00 2,000,000.00 - 6,187,634.00 - - 2,100,000.00 - - - 912,366.00 12,500,000.00 REPAIR/REHAB. OF CLASSROOM BUILDING 1,300,000.00 1,300,000.00 REHABILITATION OF WARASIWIS WATER SYSTEM 2,000,000.00 2,000,000.00 CONSTRUCTION OF BOGUIBOG BIRTHING BHS 3,357,700.00 3,357,700.00 NURSE DEPLOYMENT PROJECT(NDP) / (RNHEALS) AND RURAL HEALTH MIDWIFE PLACEMENT PROGRAM (RHMPP) 674,934.00 674,934.00 PROVISIONS OF MEDICINES, VACCINES, SUPPLIES FOR THE DIFFERENT DOH PROGRAMS 1,600,000.00 1,600,000.00 TRAININGS OF HEALTH SERVICE PROVIDERS 555,000.00 555,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF DAYCARE CENTER 1,600,000.00 1,600,000.00 SUSTAINABLE LIVELIHOOD (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 REHABILITATION OF BOGUIBOG COSCOSNONG ROAD 912,366.00 912,366.00 134 SAN EMILIO 3,023,000.00 - - - 3,807,000.00 - 1,120,000.00 - - 4,550,000.00 - - - - 12,500,000.00 ORGANIC AGRICULTURE PROGRAM - PHASE I 3,023,000.00 3,023,000.00 POTABLE WATER SYSTEM 3,807,000.00 3,807,000.00 CONSTRUCTION OF BHS BUILDING 1,120,000.00 1,120,000.00 CONSTRUCTION OF DAY CARE CENTERS PHASE-I 1,170,000.00 1,170,000.00 IMPROVEMENT OF DAY CARE CENTERS- PHASE I 2,380,000.00 2,380,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - PHASE I 1,000,000.00 1,000,000.00 135 SAN ESTEBAN 3,720,000.00 - - - 6,380,000.00 - 1,000,000.00 - - 1,400,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 2,720,000.00 2,720,000.00 AGRI-FISHERY TRAININGS 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 FLOOD CONTROL PROGRAM ALONG BRGYS. APATOT, VILLA QUIRINO, SAN PABLO, AND BATERIA (PHASE I) 4,700,000.00 4,700,000.00 PROVISION OF POTABLE WATER SUPPLY 1,680,000.00 1,680,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 REPAIR/UPGRADING OF CAPPA-CAPPA AND CABAROAN DAY CARE CENTERS 1,400,000.00 1,400,000.00 136 SAN ILDEFONSO 3,520,000.00 - - - 4,367,600.00 - 512,400.00 500,000.00 - 1,900,000.00 1,200,000.00 - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,520,000.00 3,520,000.00 IRRIGATION PROJECTS (STW-DIESEL) - INFRASTRUCTURE/ PRODUCTION SUPPORT: -FOUR-WHEEL TRACTOR (90HP) - INFRASTRUCTURE/ PRODUCTION SUPPORT: -COMBINE HARVESTER THRESHER - CONSTRUCTION OF DRAINAGE CANAL 4,367,600.00 4,367,600.00 DIVERSIFIED TRAININGS 512,400.00 512,400.00 OFWREINTEGRATION PROGRAM 500,000.00 500,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS- CONSTRUCTION OF DAY CARE CENTER AND REPAIR/UPGRADING OF DAY CARE CENTERS 1,300,000.00 1,300,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING-PROVISION OF ECCD LEARNING MATERIALS, PROVISION OF HYGIENE KITS, PROVISION OF MATERIALS IN DAY CARE CENTERS, CONTINUOUS CAPACITY BUILDING OF DAY CARE WORKERS AND CAPABILITY-BUILDING OF SOCIAL WORKERS ALONG MANAGEMENT OF DIFFERENT CASES 600,000.00 600,000.00 YAMAN PINOY -TRAININGS, PRODUCT DEVELOPMENT AND MARKETING 700,000.00 700,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM-MICROENTERPRISE DEVELOPMENT TRACK-MEAT PROCESSING TRAINING, PEANUT AND SESAME SEED PROCESSING TRAINING, PICKELS-MAKING TRAINING, BASI AND VINEGAR PRODUCTION 500,000.00 500,000.00 137 SAN JUAN 750,000.00 - - 4,350,000.00 1,000,000.00 - 1,500,000.00 - - 4,900,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - PROVISION OF RICE THRESHER AND CORN SHELLER 750,000.00 750,000.00 REPAIR/REHABILITATION OF CLASSROOMS 4,350,000.00 4,350,000.00 CONSTRUCTION OF FLOOD CONTROL (DRAINAGE CANAL) 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (IMPROVEMENT OF RURAL HEALTH UNIT) 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT - A. CONSTRUCTION OF DAY CARE CENTERS 2,250,000.00 2,250,000.00 B. REPAIR/UPGRADING OF DAY CARE CENTERS 1,650,000.00 1,650,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING - PROVISION OF ECCD LEARNING MATERIALS & SUPERVISED NEIGHBORHOOD PLAYGROUPS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM- PROVISION OF SEED CAPITAL 500,000.00 500,000.00 138 SAN VICENTE 2,300,000.00 - - 2,000,000.00 3,100,000.00 - 1,500,000.00 - - 2,600,000.00 500,000.00 - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,300,000.00 2,300,000.00 RICE COMBINE HARVESTER - MULTI-PURPOSE DRYING PAVEMENT - MUSHROOM PRODUCTION W/ LABORATORY - FISH NETS-FISH CAGE PRODUCTION - VARIOUS PROJECTS 1,500,000.00 1,500,000.00 REPAIR/REHABILITATION OF CLASSROOMS-POBLACION - REPAIR/REHABILITATION OF CLASSROOMS-SAN SEBASTIAN - REPAIR/REHABILITATION OF CLASSROOMS-PUDOC - REPAIR/REHABILITATION OF CLASSROOMS-BAYUBAY SUR - REPAIR/REHABILITATION OF CLASSROOMS-NAGTUPACAN - PROVISION OF SCHOOL FURNITURE (CHAIRS) 600 UNITS 500,000.00 500,000.00 CONSTRUCTION OF CHB LINED CANALS 1,100,000.00 1,100,000.00 FLOOD CONTROL 2,000,000.00 2,000,000.00 HIRING OF RN HEALS AND MIDWIFE 1,000,000.00 1,000,000.00 TB CONTROL 500,000.00 500,000.00 CONSTRUCTION/REPAIR OF DAY CARE CENTERS 2,100,000.00 2,100,000.00 PROVISION OF ECDD LEARNING MATERIALS 500,000.00 500,000.00 SCULPTURE INDUSTRY DEVELOPMENT 500,000.00 500,000.00 FOOD PROCESSING 500,000.00 500,000.00 139 SANTA 7,000,000.00 - - - 5,500,000.00 - - - - - - - - - 12,500,000.00 COLD STORAGE FACILITY 2,000,000.00 2,000,000.00 IRRIGATION PROJECTS 5,000,000.00 5,000,000.00 COMPLETION OF WATER SYSTEM (PHASE1) 5,500,000.00 5,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 140 SANTA CATALINA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 FLOOD CONTROL 12,500,000.00 12,500,000.00 141 SANTA CRUZ 2,600,000.00 - - 4,510,000.00 500,000.00 - - - 1,500,000.00 2,390,000.00 500,000.00 - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,600,000.00 2,600,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT A. PURCHASE OF 4-WHEEL TRACTOR - INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT A. PROVISION OF FISHING NETS - INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT B. PROVISION OF MOTORIZED BANCA - INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT C. PROVISION OF PAYAO - IRRIGATION PROJECTS (STW) - BASIC EDUCATION FACILITIES A. REPAIR AND REHABILITATION OF CLASSROOMS B. PROVISION OF SCHOOL FURNITURE 3,510,000.00 3,510,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION / ABOT-ALAM PROGRAM 740,000.00 740,000.00 GULAYAN SA PAARALAN 260,000.00 260,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 DEVELOPMENT OF KAGOTONGAN FALLS TOURISM SITE 1,500,000.00 1,500,000.00 VARIOUS PROTECTIVE SERVICES INFRA 1,890,000.00 1,890,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS A.1. CONSTRUCTION OF WOMEN CRISIS CENTER - PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS A.2. ESTABLISHMENT OF OPDA - PROTECTIVE SERVICES CAPACITY BUILDING: A.1.CONTINUOUS CAPACITY BUILDING OF DCWS, A.2.CAPABILITY BUILDING OF SOCIAL WORKERS ALONG MANAGEMENT OF DIFFERENT CASES., A.3. PROVISION OF ECCD LEARNING MATERIALS FOR DCCS - SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 YAMAN PINOY 500,000.00 500,000.00 COMMUNITY-BASED SKILLS TRAINING 500,000.00 500,000.00 142 SANTA LUCIA 5,000,000.00 - - - 3,000,000.00 - 1,000,000.00 1,000,000.00 1,000,000.00 1,500,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 5,000,000.00 5,000,000.00 MOTORIZED FISHING BOAT - FISHING NETS - TRADING POST - ELECTRIC PUMPS/DIESEL PUMPS - AGRICILTURE AND FISHERY TRAINING - AGRICULTURE PRODUCTION SUPPORT FACILITIES - SEAWALL 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 CONSTRUCTION OF PASALUBONG CENTER 1,000,000.00 1,000,000.00 PROVISION OF ECCD LEARNING MATERIALS & HYGIENE KITS FOR DAY CARE CENTER 500,000.00 500,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DCCS W/COMPLETE SET OF SOAP & FLUORIDE GEL TOOTHPASTE 1,000,000.00 1,000,000.00 143 SANTA MARIA 2,000,000.00 1,500,000.00 - 1,590,000.00 - - 2,034,000.00 - 2,000,000.00 2,100,000.00 1,276,000.00 - - - 12,500,000.00 IRRIGATION PROJECTS- IMPROVEMENT OF IRRIGATION CANALS (PHASE 1) 1,500,000.00 1,500,000.00 PURCHASE OF POWER TILLER (KULIGLIG), CORN SHELLER, RICE THRESHER 1,000,000.00 1,000,000.00 INFRA SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT-PURCHASE OF FISHING BOAT, ARTIFICIAL REEF, & FISHING NET (PHASE I) 1,000,000.00 1,000,000.00 CLASSROOM REPAIR AND REHABILITATION (PHASE I) 900,000.00 900,000.00 GULAYAN SA PAARALAN (PHASE I) 190,000.00 190,000.00 ACCESS TO EDUCATION/ABOT KAMAY PROGRAM (PHASE I)- ALTERNATIVE LEARNING SYSTEM 500,000.00 500,000.00 CAPACITY BUILDING FOR HEALTH FACILITY STAFFS, -TRAINING ON BASIC EMERGENCY OBSTETRIC AND NEWBORN, CARE (BEMONC), - TRAINING ON MANAGEMENT OF ANIMAL BITE VICTIMS AND ORIENTATION OF ANIMAL BITE CENTER STAFF ON REVISED GUIDELINES ON MANAGEMENT OF ANIMAL BITES, UPDATES ON DIAGNOSIS, TREATMENT AND MANAGEMENT: DOST TRAINING FOR HEALTH PERSONNEL, TRAINING FOR TOT AND MODULAR FOR IMPLEMENTERS ON COMPRHENSIVE STI CASE MANAGEMENT AND CAPACITY BUILDING ON VOLUNTARY HIV COUNSELING AND TESTING, TRAINING FOR CERTIFIED PEST APPLICATORS, ATTENDANCE FOR WATER, SANITATION AND HYGIENE TRAINING 528,000.00 528,000.00 PROCUREMENT OF BASIC EQUIPMENTS AND INVESTMENT FOR FOUR (4) BARANGAY HEALTH STATIONS 1,506,000.00 1,506,000.00 CONSTRUCTION OF TOURISM INFORMATION CENTER/PASALUBONG & SOUVENIR SHOP WITH CENTER AMENITIES (RESTROOMS, PARKING AREA, PERIPHERAL FENCE, LIGHTINGS) 2,000,000.00 2,000,000.00 CONSTRUCTION OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 1,100,000.00 1,100,000.00 YAMAN PINOY (PHASE I)--PRODUCT DEVELOPMENT & MARKETING 1,276,000.00 1,276,000.00 144 SANTIAGO 7,200,000.00 - - 500,000.00 3,000,000.00 - 1,000,000.00 - - - - - 800,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 7,200,000.00 7,200,000.00 IRRIGATION PROJECTS - INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY DEVELOPMENT A) TRACTORS - INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY DEVELOPMENT B) MOTORIZED FISHING BOAT - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY DEVELOPMENT C) FISH NETS - MARINE RESERVE AND FISH SANCTUARIES - ORGANIC FERTILIZER PRODUCTION - REPAIR/REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 FLOOD CONTROL 3,000,000.00 3,000,000.00 HEALTH FACILITIES AND ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 TECHNICAL-VOCATIONAL SKILLS TRAINING PROGRAM 800,000.00 800,000.00 145 SANTO DOMINGO 2,000,000.00 - - 849,800.00 - - - - - 2,000,000.00 - - - 7,650,200.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 2,000,000.00 2,000,000.00 PROVISION OF SCHOOL FURNITURES (SEATS) 849,800.00 849,800.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,000,000.00 2,000,000.00 VARIOUS ROAD PROJECTS 7,650,200.00 7,650,200.00 CORE LOCAL ROAD CONSTRUCTION: CONCRETING OF ROADS - CORE LOCAL ROAD CONSTRUCTION: CONCRETING OF ROADS - CORE LOCAL ROAD CONSTRUCTION: CONCRETING OF ROADS - CORE LOCAL ROAD CONSTRUCTION: CONCRETING OF ROADS - CORE LOCAL ROAD CONSTRUCTION: CONCRETING OF ROADS - 146 SIGAY 5,447,546.00 - - 2,200,000.00 3,552,304.00 - 1,300,650.00 - - - - - - - 12,500,500.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PROGRAM 3,947,546.00 3,947,546.00 BASIC EDUCATION FACILITIES: REPAIR / REHABILITATION OF CLASSROOMS 2,200,000.00 2,200,000.00 FLOOD CONTROL 3,552,304.00 3,552,304.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 725,650.00 725,650.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 575,000.00 575,000.00 147 SINAIT 2,173,017.00 - - 2,906,037.00 - - 2,000,000.00 - - 3,200,000.00 - - - 2,220,946.00 12,500,000.00 PROGRAM SUPPORT TO AGRICULTURE AND FISHERY PROD'N & DEVELOPMENT (DA-02) A. FARM MECHANIZATION, 2- UNITS MINI FOUR-WHEEL TRACTOR, 2 - UNITS HAND TRACTOR, 5 - UNITS RICE CUTTER, 2 - UNITS RICE REAPER, 2 - UNITS MECHANICAL DRYERS, 1 UNIT - CLOSED DELIVERY VANS 2,173,017.00 2,173,017.00 REPAIR /REHABILITATION OF CLASSROOMS, PROVISION OF SCHOOL FURNITURE: SINAIT WEST CENTRAL SCHOOL, SINAIT EAST CENTRAL SCHOOL, BARACBAC ELEMENTARY SCHOOL, BINACUD INTEGRATED SCHOOL, CABARAMBANAN ELEMENTARY SCHOOL, CADANGALAAN ELEMENTARY SCHOOL, DADALAQUITEN ELEMENTARY SCHOOL, DEAN LEOPOLDO YABES ELEMENTARY SCHOOL, MASADAG ELEMENTARY SCHOOL, SABANGAN ELEMENTARY SCHOOL, SAPRIANA ELEMENTARY SCHOOL, SANTA TERESITA CRUZ ELEMENTARY SCHOOL, TEPPENG ELEMENTARY SCHOOL, TUBIGAY ELEMENTARY SCHOOL, BARIKIR PRIMARY SCHOOL, CURTIN PRIMARY SCHOOL, KATIPUNAN PRIMARY SCHOOL, MARNAY PRIMARY SCHOOL 2,806,037.00 2,806,037.00 INFRASTUCTURE SUPPORT TO GULAYAN SA PAARALAN -BIO INTENSIVE GARDENING (BIG) - ORGANIC FERTILIZER BAG, CYCLONE WIRE,SEED BAG / PLASTIC TRAY PURCHASED; ESTABLISHMENT OF NURSERY 100,000.00 100,000.00 RHU EQUIPMENTS AND INSTRUMENTS FOR MATERNAL AND NEWBORN CARE AND TB DOTS 2,000,000.00 2,000,000.00 CONSTRUCTION OF 4 UNITS DAY CARE 3,200,000.00 3,200,000.00 CORE LOCAL ROAD CONSTRUCTION 2,220,946.00 2,220,946.00 148 SUGPON 1,850,000.00 - - 4,000,000.00 6,650,000.00 - - - - - - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,850,000.00 1,850,000.00 CONSTRUCTION OF GAYAMAN-MACACBE COMMUNAL IRRIGATION SYSTEM - CONSTRUCTION OF COMMUNITY-BASED TILAPIA HATCHERY - CONSTRUCTION OF FLAT BED DRYER - REHABILITATION OF 8 CLASSROOMS AT SUGPON CENTRAL SCHOOL 4,000,000.00 4,000,000.00 CONSTRUCTION OF POBLACION/BALBALAYANG POTABLE WATER SYSTEM 6,650,000.00 6,650,000.00 149 SUYO 4,639,631.00 - - - 4,631,000.00 - 1,099,369.00 - - 2,130,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,639,631.00 4,639,631.00 IRRIGATION PROJECTS; CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF IRRIGATION SYSTEMS - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND DEVELOPMENT - TRADING POST - ORGANIC FERTILIZER PRODUCTION - SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT (SALINTUBIG)- PROVISION OF POTABLE WATER SUPPLY 4,631,000.00 4,631,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,099,369.00 1,099,369.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS (CONSTRUCTION OF TWO (2) DAY CARE CENTERS) 900,000.00 900,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING (PROVISION OF ECCD LEARNING MATERIALS FOR DCCS & SNPS) 630,000.00 630,000.00 SUSTAINABLE LIVELIHOOD PROGRAM-MICROENTERPRISE DEVELOPMENT TRACK 600,000.00 600,000.00 150 TAGUDIN 2,800,000.00 - - 3,000,000.00 1,950,000.00 - 2,400,000.00 - - 1,350,000.00 500,000.00 - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,800,000.00 2,800,000.00 PURCHASE OF TWELVE (12) UNITS HAND TRACTOR - PROVISION OF BEACH SEINE - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PURCHASE OF 4 WHEEL TRACTOR - ESTABLISHMENT OF FISH SANCTUARIES - REPAIR AND REHABILITATION OF CLASSROOM 2,990,000.00 2,990,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 VARIOUS PROJECTS 1,950,000.00 1,950,000.00 CONSTRUCTION OF EVACUATION CENTER - PURCHASE OF RUBBER BOAT - REHABILITATION OF WATERSOURCE - REHABILITATION OF LEVEL III WATER SUPPLY SYSTEM - REHABILITATION/REPAIR OF BRGY HEALTH STATION 2,400,000.00 2,400,000.00 REPAIR/ UPGRADING OF DAY CARE CENTERS 1,350,000.00 1,350,000.00 ENTREPRENEURAL TRAINING 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: SKILLS TRAINING FOR ENTREPRENEURIAL LIVELIHOOD 500,000.00 500,000.00 151 VIGAN CITY 2,300,000.00 - - - 7,400,000.00 - - - - - 2,800,000.00 - - - 12,500,000.00 IRRIGATION PROJECTS 900,000.00 900,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,400,000.00 1,400,000.00 VARIOUS PROJECTS 7,400,000.00 7,400,000.00 FLOOD CONTROL - EVACUATION FACILITY - YAMAN PINOY 2,800,000.00 2,800,000.00 LA UNION 59,983,648.00 3,400,000.00 - 33,805,000.00 50,265,000.00 - 24,507,000.00 3,610,000.00 1,120,000.00 28,521,021.00 5,733,000.00 4,680,000.00 5,050,000.00 30,375,331.00 251,050,000.00 152 AGOO 7,829,979.00 - - 1,500,000.00 - - - - 620,000.00 2,050,021.00 - - 500,000.00 - 12,500,000.00 TRAINING ON ADVANCE PRODUCTION CUM PROCESSING 500,000.00 500,000.00 GOAT RAISING 530,500.00 530,500.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT 4,600,000.00 4,600,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENT 500,000.00 500,000.00 ESTABLISHMENT OF ARTIFICIAL REEF 1,699,479.00 1,699,479.00 PROCUREMENT OF SCHOOL CHAIRS WITH WRITING BOARD 1,500,000.00 1,500,000.00 MICRO AND SMALL TOURISM ENTERPRISE ( RECYCLABLES - CHARCOAL MAKING, ROPE MAKING, HOME DECOR,PLASTIC BAG,HAT,CORSAGE WALLET,ETC T-SHIRT PRINTING SOUVENIR ITEMS) 620,000.00 620,000.00 CONSTRUCTION OF DAY CARE CENTER 2,050,021.00 2,050,021.00 SKILLS TRAINING ON MOTORCYCLE AND SMALL ENGINE WITH START-UP TOOLS AND EQUIPMENTS 500,000.00 500,000.00 153 ARINGAY 2,484,000.00 - - 1,500,000.00 2,000,000.00 - 5,016,000.00 500,000.00 - 500,000.00 - - 500,000.00 - 12,500,000.00 LIVELIHOOD PROGRAM- FISHING GEAR ASSISTANCE TO FISHERFOLKS 500,000.00 500,000.00 LIVELIHOOD PROGRAM- FARM MECHANIZATION ASSISTANCE TO FARMERS 1,000,000.00 1,000,000.00 TRAININGS/ CAPABILITY BUILDING - AGRI-FISHERY TRAINING 984,000.00 984,000.00 REPAIR/REHAB. OF CLASSROOMS 1,270,000.00 1,270,000.00 GULAYAN SA PAARALAN 230,000.00 230,000.00 FLOOD CONTROL PROGRAM 2,000,000.00 2,000,000.00 CONST. OF BHS - GALLANO (GIDA BARANGAY) 1,080,000.00 1,080,000.00 CONST. OF BHS - SAN JUAN EAST (GIDA BRGY.) 1,080,000.00 1,080,000.00 REPAIR/ENHANCEMENT OF BHS 600,000.00 600,000.00 REPAIR/ENHANCEMENT OF BHS 600,000.00 600,000.00 REPAIR/ENHANCEMENT OF BHS 600,000.00 600,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 1,056,000.00 1,056,000.00 LIVELIHOOD PROGRAM- GARMENTS PRODUCTION 500,000.00 500,000.00 LIVELIHOOD PROGRAM- RICE RETAILING 500,000.00 500,000.00 TRAININGS/ CAPABILITY BUILDING- COMMUNITY BASED TRAINING SKILLS 500,000.00 500,000.00 154 BACNOTAN 5,210,000.00 - - 2,290,000.00 - - 1,500,000.00 - - 3,000,000.00 - - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 5,210,000.00 5,210,000.00 TRAINING AND LIVELIHOOD ASSISTANCE PROGRAM FOR COOPERATIVE MEMBERS - ADOPT A BUFFALO PROJECT - ESTABLISHMENT OF BACNOTAN TRADING POST - BAGSAKAN CENTER FOR FARM PRODUCTS - ORGANIC AGRICULTURE - FISHERY-SUPPORT TO MPA - PROJECT ALTERNATIVE LEARNING SYSTEM - ALS (PHASE II) 750,000.00 750,000.00 GULAYAN SA PAARALAN P10,000.00/SCHOOL 180,000.00 180,000.00 REPAIR AND IMPROVEMENT OF UNITS CLASSROOM 1,360,000.00 1,360,000.00 COMPLETION OF MUNICIPAL HEALTH OFFICE FACILITY (1ST FLOOR) 1,500,000.00 1,500,000.00 EVACUATION CENTER 3,000,000.00 3,000,000.00 SKILLS TRAINING AND LIVELIHOOD ASSISTANCE PERSONS WITH DISABILITY (PWD) SAMAKABA (SAMAHAN NG MAY KAPANSANAN SA BACNOTAN) 500,000.00 500,000.00 155 BAGULIN 3,100,000.00 - - - 1,500,000.00 - 1,700,000.00 500,000.00 - 2,200,000.00 1,000,000.00 - 500,000.00 2,000,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,100,000.00 3,100,000.00 ARC CONECTIVITY & ECONOMIC SUPPORT SERVICES (ARCCESS) - TRADING CENTER - ORGANIC FERTILIZER PRODUCTION - INFRASTRUCTURE SUPPORT TO AGRICULTURE - IRRIGATION PROJECT - POST HARVEST FACILITY - FLOOD CONTROL 500,000.00 500,000.00 REHABILITATION OF WATER SUPPLY (SALINTUBIG) 1,000,000.00 1,000,000.00 BHS EQUIPMENT PACKAGE 500,000.00 500,000.00 CONSTN OF BHS (GIDA), TIO-ANGAN 1,200,000.00 1,200,000.00 OFW'S REINTEGRATION PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO-ENTERPRISE DEVELOPMENT TRACK 700,000.00 700,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROTECTIVE SERVICES INFRA PROJECTS 500,000.00 500,000.00 PROTECTIVE SERVICES INFRA PROJECTS 1,000,000.00 1,000,000.00 YAMAN PINOY 500,000.00 500,000.00 SHARED SERVICE FACILITY 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION - CORE LOCAL ROAD CONSTRUCTION - CORE LOCAL ROAD CONSTRUCTION - TECHNICAL VOCATIONAL TRAINING 500,000.00 500,000.00 156 BALAOAN 4,070,000.00 - - 3,930,000.00 - - 1,000,000.00 500,000.00 - 1,500,000.00 - - 500,000.00 1,000,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,070,000.00 4,070,000.00 REHABILITATION OF TARANGOTONG COMMUNAL IRRIGATION SYSTEM - REHABILITATION OF PATPATA SWIP - PURCHASE OF TRACTOR-KUBOTA 90HP W/ ROTAVATOR - PURCHASE OF MOTORIZED FISHING BOATS - REHABILITATION OF RP-US BAYANIHAN BUILDING IN SINAPANGAN SUR ELEMENTARY SCHOOL 700,000.00 700,000.00 REHABILITATION OF CLASSROOM BUILDING IN CALLIAT ELEMENTARY SCHOOL 500,000.00 500,000.00 REHABILITATION OF CLASSROOM BUILDING IN BUTUBUT SUR ELEMENTARY SCHOOL 500,000.00 500,000.00 REHABILITATION OF CLASSROOM BUILDING IN SINAPANGAN NATIONAL HIGH SCHOOL 500,000.00 500,000.00 REHABILITATION OF CLASSROOM BUILDING IN PARAOIR NATIONAL HIGH SCHOOL 500,000.00 500,000.00 REHABILITATION OF CLASSROOM BUILDING IN BUNGOL NATIONAL HIGH SCHOOL 500,000.00 500,000.00 REHABILITATION OF CLASSROOM BUILDING IN BUTUBUT NATIONAL HIGH SCHOOL 500,000.00 500,000.00 GULAYAN SA PAARALAN PROJECT 230,000.00 230,000.00 UPGRADING OF CALLIAT BARANGAY HEALTH STATION 500,000.00 500,000.00 UPGRADING OF PARAOIR BARANGAY HELATH STATION 500,000.00 500,000.00 GOAT RAISING PROJECT 500,000.00 500,000.00 REPAIR OF SABLUT DAY CARE CENTER 500,000.00 500,000.00 REPAIR OF CALUNGBUYAN DAY CARE CENTER 500,000.00 500,000.00 REPAIR OF BARACBAC ESTE DAY CARE CENTER 500,000.00 500,000.00 REHABILITATION OF MASUPE-GUINABURAN ROAD 1,000,000.00 1,000,000.00 FISH AND SEAWEEDS PROCESSING PROJECT 500,000.00 500,000.00 157 BANGAR 2,500,000.00 - - 5,300,000.00 2,500,000.00 - - - - - 2,200,000.00 - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - PURCHASE OF FOUR (4) UNITS 4-WHEEL TRACTOR 2,500,000.00 2,500,000.00 BASIC EDUCATION FACILITIES REPAIR AND REHABILITATION OFCLASSROOMS 4,800,000.00 4,800,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM ALTERNATIVE LEARNING SYSTEM (ALS) 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY (LEVEL II) 2,000,000.00 2,000,000.00 CAPACITY BUILDING FOR CSOS - SKILLS TRAINING AND SEMINARS 500,000.00 500,000.00 LOOM WEAVING ENHANCEMENT OF BANGAR LOOM WEAVING INDUSTRY 2,200,000.00 2,200,000.00 158 BAUANG 3,000,000.00 - - 5,650,000.00 1,500,000.00 - - 1,000,000.00 - - 1,400,000.00 - - - 12,550,000.00 VARIOUS AGRICULTURE PROJECTS 3,000,000.00 3,000,000.00 PROCUREMENT OF COLD STORAGE VAN - MARINE PROTECTED AREA-ARTIFICIAL REEFS - LIVELIHOOD PROGRAM -SWINE RAISING PROJECT - BASIC EDUCATION FACILITIES- REPAIR/REHABILITATION OF SCHOOL BUILDINGS/ CLASSROOMS 3,900,000.00 3,900,000.00 BASIC EDUCATION FACILITIES-PROVISION OF SCHOOL FURNITURE (SEATS) 1,750,000.00 1,750,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) -PROVISION OF POTABLE WATER SUPPLY (CONSTRUCTION OF SPRING LEVEL I) 1,000,000.00 1,000,000.00 CAPACITY-BUILDING FOR CSOS 500,000.00 500,000.00 CARABAO-BASED ENTERPRISE 1,000,000.00 1,000,000.00 SHARED SERVICE FACILITY -COAL BRIQUETTE MAKING MACHINE 900,000.00 900,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT 500,000.00 500,000.00 159 BURGOS 1,500,000.00 - - 750,000.00 8,000,000.00 - - 600,000.00 - 1,650,000.00 - - - - 12,500,000.00 IRRIGATION PROJECTS 1,500,000.00 1,500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 750,000.00 750,000.00 CONSTRUCTION OF FLOOD CONTROL 3,000,000.00 3,000,000.00 RESTORATION/REHABILITATION OF NEWPOBLACION-AGPAY RD 1,500,000.00 1,500,000.00 SALINTUBIG -PROVISION OF POTABLER WATER SUPPLY (EXTENSION OF WATER TRANSMISSION LINES & PROVISION OF COMMUNAL FAUCETS, DRILLING & INSTALLATION OF DEEP WELL WITH WATER TRANSMISSION LINES & COMMUNAL FAUCETS) 3,500,000.00 3,500,000.00 WORKERS INCOME AUGMENTATION PROGRAM (WIN-AP) 600,000.00 600,000.00 IMPROVEMENT/UPGRADING AND REHABILITATION OF DAY CARE CENTERS 1,650,000.00 1,650,000.00 160 CABA 1,660,000.00 - - 1,800,000.00 4,000,000.00 - 2,500,000.00 - - 2,540,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVELOPMENT DEVELOPMENT (TRACTOR) 660,000.00 660,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVELOPMENT DEVELOPMENT (MOTORIZED FISHING BOAT AND NET) 500,000.00 500,000.00 POST HARVEST FACILITY (MECHANICAL DRYER) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS BASIC EDUCATION FACILITIES: REPAIR/REHAB OF SCHOOL BLDGS (CABA ELEMENTARY SCHOOL DASMM ELEMENTARY SCHOOL LABBON ELEMENTARY SCHOOL SAN CARLOS ELEMENTARY SCHOOL SAN CORNELIO ELEMENTARY SCHOOL SAN GREGORIO ELEMENTARY SCHOOL SAN JOSE ELEMENTARY SCHOOL SANTIAGO SUR INTEGRATED SCHOOL WENCESLAO ELEMENTARY SCHOOL) 1,800,000.00 1,800,000.00 SPRING DEVELOPMENT LEVEL I 1,000,000.00 1,000,000.00 FLOOD CONTROL 500,000.00 500,000.00 VARIOUS WATER PROJECTS 2,500,000.00 2,500,000.00 SALINTUBIG - DEEP WELL LEVEL 2 - SALINTUBIG -DEEP WELL LEVEL 1 - BARANGAY HEALTH STATION 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM: (6 PILLOWS, 10 SCALPEL & BLADES, 2 SOAKING TRAY, 1 ELECTRIC STOVE, 1 AUTOCLAVE, 10 PARIENTS TRAY, 1 GAS STOVE, 1 GAS TANK SET, 1 KETTLE, 1 STRECHER, 7 4X4X100S GAUZE, 2 IV STAND, 2 KELLY PAD, 2 MANUAL SUCTION BULB, 1 MATERNAL CARE INSTRUMENT SET, 1 OXYGEN TANK, 2 PANEL CURTAIN, 1 PATIENT BED, 6 PATIENT GOWN, 6 PILLOWCASES, 3 BED WITH SIDE CABINET, 1 GAS TANK SET, 1 KETTLE, 1 STRECHER, 7 4X4X100S GAUZE, 2 IV STAND, 2 KELLY PAD, 2 MANUAL SUCTION BULB, 1 MATERNAL CARE INSTRUMENT SET, 1 OXYGEN TANK, 2 PANEL CURTAIN, 1 PATIENT BED, 6 PATIENT GOWN, 6 PILLOWCASES, 3 BED WITH SIDE CABINET, 1 BASSINET, 3 BP APPARATUS, 2 CORD DRESSING TRAY, 2 EMERGENCY LIGHT, 2 FETAL DOPPLER, 3 GLOVES, 1 INSTRUMENT CABINET, 1 INSTRUMENT TABLE, 1 MICROSCOPE, 1 CENTRIFUGE PLACER, 1 CENTRIFUGE MICROHEMATOCRIT, 1 COUNTING CHAMBER, 1 COMPARATOR BLOCK, 4 INVENTORY LOGBOOK, 3 ALUMINUM TRACH CAN, 2 PATIENT STOOL, 6 BED PAN, 2 BP APPARATUS, 1 EXAMINING LIGHT, 2 MINOR SURGICAL SET, 1 SYRINGE WITH 0.23 NEEDLE) 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-BASIC EQUIPMENT: MATERNITY PACKAGE 500,000.00 500,000.00 TB DOTS 500,000.00 500,000.00 EVACUATION FACILITY 2,040,000.00 2,040,000.00 PROTECTIVE SERVICE CAPABILITY BUILDINGFOR DAY CARE WORKERS, PES WORKERSPROVISION OF ECCD LEARNING MANUALS,PROVISION OF HYGIENE KITS IN DCCS 500,000.00 500,000.00 161 CITY OF SAN FERNANDO (CAPITAL) 2,550,000.00 - - 900,000.00 1,625,000.00 - 5,491,000.00 - - 2,301,000.00 633,000.00 - - - 13,500,000.00 IRRIGATION PROJECTS (SIP, STW, OSP) 550,000.00 550,000.00 INFRA SUPPORT TO AGRI-FISHERY, PRODUCTION & DEVELOPMENT - PROVISION OF AGRICULTURAL EQUIPMENT AND FACILITIES 900,000.00 900,000.00 INFRA SUPPORT TO AGRI-FISHERY, PRODUCTION & DEVELOPMENT - PROVISION OF FISHERY PARAPHERNALIA 500,000.00 500,000.00 POST HARVEST FACILITIES AND EQUIPMENTS 600,000.00 600,000.00 REPAIR/REHABILITATION OF SCHOOLS/CLASSROOMS 900,000.00 900,000.00 SPRING DEVELOPMENT PROJECT 600,000.00 600,000.00 INSTALLATION OF DEEP WELL 525,000.00 525,000.00 INSTALLATION OF DEEP WELL 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT (ATTENDANCE TO WATER, SANITATION AND HYGIENE) OTHER TRAININGS AND COSTING TO BE DETERMINED BY DOH (24 PAX) 707,000.00 707,000.00 EQUIPMENT FOR BRGY. HEALTH STATIONS 1,206,000.00 1,206,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM: CONSTRUCTION OF BARANGAY HEALTH STATION (80 SQM* PHP18,000.00 EACH); 3,000,000.00 3,000,000.00 STI/HIV AND AIDS PREVENTION: TRAINING OF TOT AND MODULAR FOR IMPLEMENTERS ON COMPREHENSIVE, STI CASE MANAGEMENT (10 PAX), TRAINING ON ADDITIONAL PEER EDUCATORS (30 PAX), CAPACITY BUILDING ON 100%, CONDOM USE (50 PAX), 578,000.00 578,000.00 PROTECTION SERVICES HAND WASHING FACILITIES TO 63 DAY CARE CENTERS WITH COMPLETE SET OF SOUP FLUORIDE-GEL TOOTPASTE 1,701,000.00 1,701,000.00 CAPITAL ASSISTANCE PROGRAM (SLP) 600,000.00 600,000.00 BASKET WEAVING OUT OF BAMBOO 633,000.00 633,000.00 162 LUNA 2,000,000.00 - - 2,000,000.00 1,590,000.00 - 3,000,000.00 510,000.00 - 1,500,000.00 - - - 1,900,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,000,000.00 2,000,000.00 RIPRAPPING OF NAGREBCAN-ALCALA-SUCOC NORTE IRRIGATION CANAL, LUNA, LA UNION - RIPRAPPING OF IRRIGATION CANAL AT STO. NINO DOMINGO NORTE, LUNA, LA UNION - REHABILITATION OF VARIOUS SCHOOL CLASSROOMS 2,000,000.00 2,000,000.00 CONSTRUCTION OF BOX-CULVERT AT BUSEL-BUSEL, LUNA, LA UNION 500,000.00 500,000.00 IMPROVEMENT OF DRAINAGE CANAL AT LUNA PUBLIC MARKET, LUNA, LA UNION 590,000.00 590,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM AT NALVO SUR, LUNA, LA UNION 500,000.00 500,000.00 COMPLETION OF HEALTH FACILITY (BIRTHING CLINIC), LUNA, LA UNION 2,500,000.00 2,500,000.00 EMPLOYMENT OF RN HEALS AT MHO 500,000.00 500,000.00 PROVISION OF FOODCART (NEGO CART) TO 34 OSY 510,000.00 510,000.00 REPAIR / UPGRADING OF DAY CARE CENTERS 1,500,000.00 1,500,000.00 VARIOUS ROAD PROJECTS 1,900,000.00 1,900,000.00 REHABILITATION OF BARANGAY ROAD AT PILA, LUNA, LA UNION - REHABILITATION OF BARANGAY ROAD AT MAGSIPING , LUNA, LA UNION - 163 NAGUILIAN - - - - - - - - - 580,000.00 - - - 11,920,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS UPGRADING OF EVACUATION CENTER REPAIRED COMFORT ROOMS W/ SEPTIC VAULT, ROOF SCREEN,PAINTED WALLS 580,000.00 580,000.00 VARIOUS ROAD PROJECTS 11,920,000.00 11,920,000.00 REHABILITATION OF CORE LOCAL ROADS 295 METERS PAVED - REHABILITATION OF CORE LOCAL ROADS 295 METERS PAVED - REHABILITATION OF CORE LOCAL ROADS 295 METERS PAVED - REHABILITATION OF CORE LOCAL ROADS 295 METERS PAVED - REHABILITATION OF CORE LOCAL ROADS 165 METERS PAVED - REHABILITATION OF CORE LOCAL ROADS 210 METERS PAVED - REHABILITATION OF CORE LOCAL ROADS 210 METERS PAVED - REHABILITATION OF CORE LOCAL ROADS 295 METERS PAVED - REHABILITATION OF CORE LOCAL ROADS 295 METERS PAVED - 164 PUGO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATERSUPPLY (LEVEL II) 12,500,000.00 12,500,000.00 165 ROSARIO 4,800,000.00 1,400,000.00 - 500,000.00 - - - - - 4,750,000.00 - - 1,050,000.00 - 12,500,000.00 REHABILITATION OF MOTORIZED AND NON-MOTORIZED BANCA 500,000.00 500,000.00 REHABILITATION OF COMMUNAL IRRIGATION SYSTEM 1,400,000.00 1,400,000.00 ESTABLISHMENT OF MARINE PROTECTED AREA 1,100,000.00 1,100,000.00 ACQUISITION OF FARM MECHANIZATION FACILITIES 1,340,000.00 1,340,000.00 PURCHASE OF REEFER VAN WITH ACCESSORIES 860,000.00 860,000.00 GOAT PRODUCTION CUM TRAINING 500,000.00 500,000.00 GULAYAN SA BAKURAN 500,000.00 500,000.00 REPAIR OF SCHOOL BUILDING 500,000.00 500,000.00 ESTABLISHMENT OF OPDA 500,000.00 500,000.00 CONSTRUCTION/REHABILITATION OF DAY CARE CENTERS 3,000,000.00 3,000,000.00 REHABILITATION OF EVACUATION CENTER 750,000.00 750,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 TRAINING ON HIGH SPEED SEWING 550,000.00 550,000.00 SKILLS TRAINING ON SMALL ENGINE REPAIR AND MAINTENANCE 500,000.00 500,000.00 166 SAN GABRIEL 1,400,000.00 - - - - - 800,000.00 - - 500,000.00 - 4,680,000.00 - 5,120,000.00 12,500,000.00 SMALL IRRIGATION SYSTEM 800,000.00 800,000.00 HAND TRACTORS 600,000.00 600,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 800,000.00 800,000.00 CONSTRUCTION OF DAY CARE CENTERS 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 5,120,000.00 5,120,000.00 CONSTRUCTION OF CORE LOCAL ROADS - REHABILITATION OF CORE LOCAL ROADS - CONSTRUCTION OF CORE LOCAL ROADS - CONSTRUCTION OF CORE LOCAL ROADS - CONSTRUCTION OF CORE LOCAL ROADS - CONSTRUCTION OF CORE LOCAL ROADS - ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 4,680,000.00 4,680,000.00 167 SAN JUAN 6,865,000.00 - - 2,085,000.00 2,550,000.00 - - - 500,000.00 - 500,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 6,865,000.00 6,865,000.00 PURCHASE OF 1 UNIT REFRIGERATED TRANSPORT VAN - ORGANIC FERTILIZER PRODUCTION - AGRI-FISHERY TRAINING - MOTORIZED FISHING BOATS 2 UNITS WITH PARAPHERNALIA - TILAPIA INFRA HATCHERY PROJECT - AQUASILVI CULTURE AND MANGROVE PROJECT - CONCRETE ARTIFICIAL REEF PROJECT - TRADING POST (BAGSAKAN CENTER) - REPAIR OF SCHOOL BUILDING / ACQUISITION OF SCHOOL FURNITURES 850,000.00 850,000.00 GULAYAN SA PAARALAN 215,000.00 215,000.00 ABOT ALAM PROGRAM IN EDUCATION / INNOVATIVEPROGRAMS IN EDUCATION 1,020,000.00 1,020,000.00 SALINTUBIG (SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT) 2,550,000.00 2,550,000.00 TOURISM SKILLS DEVELOPMENT TRAINING 500,000.00 500,000.00 SKILLS TRAINING ON BAMBOO PRODUCTS 500,000.00 500,000.00 168 SANTO TOMAS 3,514,669.00 2,000,000.00 - 1,100,000.00 - - 500,000.00 - - 1,950,000.00 - - - 3,435,331.00 12,500,000.00 CONSTRUCTION OF IRRIGATION SYSTEM (PLUME) 2,000,000.00 2,000,000.00 PURCHASE OF FARM MACHINERIES/EQUIPMENT 2,464,669.00 2,464,669.00 PURCHASE OF GILL NETS 550,000.00 550,000.00 ORGANIC FERTLIZER PRODUCTION WITH SHED 500,000.00 500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 600,000.00 600,000.00 REHABILITATION OF SPED CLASSROOM FOR CHILDREN WITH SPECIAL NEEDS 500,000.00 500,000.00 PROVISION OF EQUIPMENT FOR THE TB-DOTS CENTER AND LYING- IN FACILITY 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 TRAINING CUM WORKSHOP AND PROVISION OF ECCD LEARNING MATERIALS FOR DAY CARE WORKERS 500,000.00 500,000.00 PROVISION OF LIVELIHOOD ASSISTANCE UNDER SEA-K 700,000.00 700,000.00 CONSTRUCTION / REHABILITATION OF LOCAL ROADS 3,435,331.00 3,435,331.00 169 SANTOL - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 REHABILITATION/EXPANSION OF LEVEL III WATER SUPPLY SYSTEM 12,500,000.00 12,500,000.00 170 SUDIPEN 2,000,000.00 - - 4,500,000.00 - - 3,000,000.00 - - 1,500,000.00 - - 1,500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,000,000.00 2,000,000.00 PROCUREMENT OF 2 UNITS OF 4-WHEEL TRACTOR - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ORGANIC FERTILIZER PRODUCTION - 25 HAND TRACTORS AND POST HARVEST FACILITIES - REPAIR AND REHABILITATION OF OLD SCHOOL BUILDINGS 4,500,000.00 4,500,000.00 COMPLETION OF SECOND STOREY RHU & TRAINING OF RHU STAFF 1,500,000.00 1,500,000.00 RECONSTRUCTION OF OLD CENTRAL BHS 1,500,000.00 1,500,000.00 UPGRADE/PROVISION DAY CARE CENTERS - PLAYGROUND FACILITIES 500,000.00 500,000.00 ESTABLISHMENT OF OFFICE OF PERSON'S WITH DISABILITIES 1,000,000.00 1,000,000.00 BAMBOO CRAFT AND FRUIT CROPS PROCESSING 500,000.00 500,000.00 SKILLS TRAINING ON BEAUTY & WELLNESS 500,000.00 500,000.00 MEAT PROCESSING FOR TOCINO, LONGGANISA AND EMBOTIDO 500,000.00 500,000.00 171 TUBAO 5,500,000.00 - - - - - - - - 2,000,000.00 - - - 5,000,000.00 12,500,000.00 CONSTRUCTION/REPAIR OF SMALL WATER IMPOUNDING PROJECT (SWIP) 5,500,000.00 5,500,000.00 COMPLETION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 CORE LOCAL ROAD 5,000,000.00 5,000,000.00 PANGASINAN 98,268,850.00 8,750,000.00 7,300,000.00 56,542,500.00 181,982,250.00 - 47,933,013.65 6,690,000.00 8,700,000.00 80,503,000.00 29,504,300.00 - 14,759,000.00 87,567,086.35 628,500,000.00 172 AGNO - - - - 10,000,000.00 - - - 2,500,000.00 - - - - - 12,500,000.00 CONSTRUCTION OF DRRM EVACUATION CENTER 5,500,000.00 5,500,000.00 PROVISION OF LEVEL I & II POTABLE WATER SUPPLY SYSTEM 3,500,000.00 3,500,000.00 PURCHASE OF DISASTER RESPONSE AND RESCUE EQUIPMENT (I.E. INFLATABLE BOAT, LIFE JACKET, UNDERWATER FLASHLIGHT, CHAINSAW, ROPE 1,000,000.00 1,000,000.00 CONSTRUCTION OF ADDITIONAL TOURIST SHEDS AT UMBRELLA ROCKS, SITO ABAGATANEN, BRGY. BOBOY 2,500,000.00 2,500,000.00 173 AGUILAR 5,000,000.00 - - - 7,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF WAREHOUSE FOR PALAY AND CORN TRADING 3,500,000.00 3,500,000.00 PROCUREMENT OF MULTI-PURPOSE MECHANICAL AND ELECTRICAL DRYER 1,500,000.00 1,500,000.00 NANCUPAPEYAN SPRING DEVELOPMENT (LEVEL II) 7,500,000.00 7,500,000.00 174 ALAMINOS CITY 1,700,000.00 - - 2,700,000.00 600,000.00 - 3,440,000.00 600,000.00 - 2,300,000.00 - - 1,160,000.00 - 12,500,000.00 YAMAN PINOY (VERMICULTURE PRODUCTION FOR SUSTAINABLE AGRICULTURE) 500,000.00 500,000.00 SMALL IRRIGATION PROJECT (SIP) 1,200,000.00 1,200,000.00 REPAIR/REHABILITATION OF ALTERNATIVE LEARNING CENTER 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN 1,200,000.00 1,200,000.00 CAPACITY BUILDING FOR CSOS 600,000.00 600,000.00 COMMUNITY HEALTH TRAINING 512,000.00 512,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,217,600.00 2,217,600.00 RN HEALS 710,400.00 710,400.00 DOLE ILP:WIN AP 600,000.00 600,000.00 UPGRADING OF DAY CARE CENTERS 1,800,000.00 1,800,000.00 ESTABLISHMENT OF PDAO 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: SKILLS TRAINING FOR ENTREPRENEURIAL LIVELIHOOD 1,160,000.00 1,160,000.00 175 ALCALA 2,400,000.00 - - 1,350,000.00 2,000,000.00 - 1,525,000.00 - - 1,750,000.00 - - - 3,475,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,400,000.00 2,400,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT >(HARVESTER, THRESHER) - ORGANIC FERTILIZER PRODUCTION - BASIC EDUCATION FACILITIES REPAIR/REHABILITATION OF CLASSROOMS 1,350,000.00 1,350,000.00 FLOOD CONTROL: CONSTRUCTION OF DRAINAGE/CANALS 2,000,000.00 2,000,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 500,000.00 500,000.00 TRAING AND CAPACITY BUILDING OF 16 RU STAFF AND PEER EDUCATION ON HIV/AIDS AND OTHER SEXUALLY TRANSMITTED INFECTIONS AND MANAGEMENT 525,000.00 525,000.00 TRAINING OF 50 RHU STAFF, HEALTH WORKERS, BARANGAY OFFICIALS ON HEALTH EMERGENCY MANAGEMENT AND DISASTER PREPAREDNESS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SPL) - MICROENTERPRISE DEVELOPMENT TRACK1 500,000.00 500,000.00 PROTECTIVE SERVICES: INSFRASTRUCTURE SERVICES CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 UPGRADING OF DAY CARE CENTERS 500,000.00 500,000.00 CORE LOCAL ROAD: CONCRETING 3,475,000.00 3,475,000.00 176 ANDA - - - - 4,000,000.00 - - - 2,000,000.00 2,000,000.00 - - - 4,500,000.00 12,500,000.00 RESCUE EQUIPMENT 2,000,000.00 2,000,000.00 CONSTRUCTION OF SEA WALL 2,000,000.00 2,000,000.00 TOURISM FACILITY 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SPL) - MICROENTERPRISE DEVELOPMENT TRACK 2,000,000.00 2,000,000.00 VARIOUS ROAD PROJECTS 4,500,000.00 4,500,000.00 CONCRETING OF CORE ROAD - CONCRETING OF CORE ROAD - CONCRETING OF CORE ROAD - CONCRETING OF CORE ROAD - 177 ASINGAN 3,780,000.00 - - 5,000,000.00 - - 520,000.00 1,000,000.00 - 2,200,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,780,000.00 3,780,000.00 ESTABLISHMENT OF TRADING POST - REHABILITATION OF IRRIGATION CANALS - REPAIR OF SCHOOL BUILDINGS 5,000,000.00 5,000,000.00 COMPREHENSIVE NUTRITION PROGRAM (STRICT IMPLEMENTATION OF R.A. 8772, R.A. 8976 AND MILK CODE; PURCHASE OF MICRONUTRIENTS) 520,000.00 520,000.00 LIVELIHOOD PROGRAM (PURCHASE OF NEGO KARTS) & SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENTS (SPES) 1,000,000.00 1,000,000.00 PROVISION OF ECCD LEARNING MATERIALS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CAPABILITY BUILDING PROJECT 200,000.00 200,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 REPAIR AND UPGRADING OF DAY CARE CENTER 750,000.00 750,000.00 178 BALUNGAO 6,300,000.00 - - - - - 2,172,000.00 500,000.00 - 3,528,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 6,300,000.00 6,300,000.00 PROVISION OF FARM MACHINERY IN SUPPORT TO AGRICULTURAL PRODUCTION AND DEVELOPMENT - INSTALLATION OF SHALLOWTUBE WELLS IN SUPPORT TO FOOD SUFFICIENCY PROGRAM - PROVISION OF POST -HARVEST FACILITIES - HEALTH FACILITIES ENHANCEMENT PROGRAM 1,500,000.00 1,500,000.00 RN HEALS 672,000.00 672,000.00 PURCHASE OF NEGO CARTS 500,000.00 500,000.00 PROTECTIVE SERVICES: A. CAPACITY BUILDING 528,000.00 528,000.00 PROTECTIVE SERVICES: B. INFRASTRUCTURE 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,500,000.00 2,500,000.00 179 BANI 8,900,000.00 - 500,000.00 - - - - - 1,000,000.00 1,600,000.00 500,000.00 - - - 12,500,000.00 IRRIGATION PROJECTS (SIP / STW/ OSP) 2,700,000.00 2,700,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVT. (TRACTOR, HARVESTER) 2,000,000.00 2,000,000.00 POST HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT) 2,200,000.00 2,200,000.00 ORGANIC FERTILIZER PRODUCTION 2,000,000.00 2,000,000.00 NATIONAL GREENING PROGRAM (NGP) 500,000.00 500,000.00 PASALUBONG CENTER W/ COMFORT ROOM 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) (CDED PROCESS) 1,600,000.00 1,600,000.00 YAMAN-PINOY 500,000.00 500,000.00 180 BASISTA 4,115,000.00 - - 1,500,000.00 4,285,000.00 - - - - 2,600,000.00 - - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,600,000.00 1,600,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,885,000.00 1,885,000.00 POST HARVEST FACILITY 630,000.00 630,000.00 BASIC EDUCATION FACILITIES - REPAIR OF PUBLIC SCHOOL CLASSROOMS - PROVISION OF SCHOOL FURNITURES 1,500,000.00 1,500,000.00 EVACUATION FACILITY 2,500,000.00 2,500,000.00 EVACUATION FACILITY - PROCUREMENT OF EQUIPMENT FOR DISASTER PROGRAM 500,000.00 500,000.00 ASPHALT OVERLAY CP GARCIA ST. 1,285,000.00 1,285,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,600,000.00 1,600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 181 BAUTISTA 4,250,000.00 - - 140,000.00 1,190,000.00 - 2,160,000.00 - - 2,250,000.00 1,400,000.00 - 1,110,000.00 - 12,500,000.00 POST HARVEST FCILITIES- MULTI-PURPOSE DRYING PAVEMENT 4,250,000.00 4,250,000.00 GULAYAN SA PAARALAN 140,000.00 140,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 1,190,000.00 1,190,000.00 RN HEALS 2,160,000.00 2,160,000.00 CONSTRUCTION OF DAY CARE CENTERS 2,250,000.00 2,250,000.00 YAMAN PINOY 1,400,000.00 1,400,000.00 TECHNICAL VOCATIONAL TRAINING 1,110,000.00 1,110,000.00 182 BAYAMBANG - - - - 9,300,000.00 - - - - - 1,000,000.00 - - 6,200,000.00 16,500,000.00 FLOOD CONTROL SYSTEM 9,300,000.00 9,300,000.00 STREAMLINING BUSINESS PERMITS AND LICENSING SYSTEM 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION 6,200,000.00 6,200,000.00 183 BINALONAN - - - - 5,000,000.00 - - - - - 5,000,000.00 - - 2,500,000.00 12,500,000.00 CONSTRUCTION TAGAMUSING RIVER RETAINING WALL 1,000,000.00 1,000,000.00 CONCRETING OF DRAINAGE CANAL 4,000,000.00 4,000,000.00 SHARED SERVICE FACILITY - PRODUCTION EQUIPMENT 2,000,000.00 2,000,000.00 SHARED SERVICE FACILITY - PRODUCTION EQUIPMENT 2,000,000.00 2,000,000.00 SHARED SERVICE FACILITY - PRODUCT PROMOTION 1,000,000.00 1,000,000.00 CONCRETING OF SITIO LAMBINGAN CORE ACCESS ROAD 2,500,000.00 2,500,000.00 184 BINMALEY 3,000,000.00 - - - 7,000,000.00 - - - - 1,000,000.00 - - - 1,500,000.00 12,500,000.00 PORTS AND WHARVES 2,000,000.00 2,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD & OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,000,000.00 1,000,000.00 EVACUATION FACILITY 4,000,000.00 4,000,000.00 FLOOD CONTROL 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 1,500,000.00 1,500,000.00 185 BOLINAO 1,645,000.00 - - 3,330,000.00 500,000.00 - 850,000.00 - 500,000.00 1,700,000.00 2,125,000.00 - - 1,850,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,645,000.00 1,645,000.00 POST HARVEST FACILITIES AND EQUIPMENT- A. MECHANICAL DRYER - POST HARVEST FACILITIES AND EQUIPMENT -B. PAVEMENT - IRRIGATION PROJECT - BASIC FACILITIES REPAIR/REHABILITATION OF CLASSROOM 3,330,000.00 3,330,000.00 CAPACITY BUILDING 500,000.00 500,000.00 REPAIR/UPGRADING OF BARANGAY HEALTH CENTER 850,000.00 850,000.00 TRAINING OF LOCAL TOUR GUIDES SUCH BOATMAN, TRANSPORT SECTOR, OSY 500,000.00 500,000.00 CONSTRUCTION OF 1 UNIT DAY CARE CENTER 850,000.00 850,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO ENTERPRISE TRACKING 850,000.00 850,000.00 PASALUBONG CENTER 850,000.00 850,000.00 MUNICIPAL ECONOMIC DEVELOPMENT 1,275,000.00 1,275,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION-100 METERS LONG BY 2 METERS FOOT BRIDGES 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION -25 METERS LONG BY 2 METERS FOOT BRIDGES 850,000.00 850,000.00 186 BUGALLON 500,000.00 - - 5,000,000.00 - - 4,500,000.00 - - 2,500,000.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 REPAIR/REHABILITATION OF SCHOOLS CLASSROOM 5,000,000.00 5,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (BARANGAY HEALTH STATION) 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (BARANGAY HEALTH STATION) 2,500,000.00 2,500,000.00 CONSTRUCTION OF DAY CARE CENTERS 2,500,000.00 2,500,000.00 187 BURGOS 3,150,000.00 750,000.00 - - 1,800,000.00 - - - - 2,500,000.00 - - - 4,300,000.00 12,500,000.00 IRRIGATION EXPANSION 750,000.00 750,000.00 MOTORIZED FISHING BOATS, 500,000.00 500,000.00 SMALL IRRIGATION PROJECTS 550,000.00 550,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT 750,000.00 750,000.00 ACQUISITION OF RICE THRESHER 600,000.00 600,000.00 ACQUISITION OF HAND TRACTOR 750,000.00 750,000.00 RESCUE EQUIPMENT 800,000.00 800,000.00 REHABILITATION AND EXPANSION OF WATER WORKSYSTEM 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,500,000.00 2,500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE REHABILITATION 4,300,000.00 4,300,000.00 188 CALASIAO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 FLOOD CONTROL 10,000,000.00 10,000,000.00 RESCUE EQUIPMENT 2,500,000.00 2,500,000.00 189 DAGUPAN CITY - - - - 10,786,000.00 - - - - - - - 1,714,000.00 - 12,500,000.00 CONSTRUCTION OF AN EVACUATION CENTER 10,786,000.00 10,786,000.00 SKILLS TRAINING FOR PROJECT BELEN 1,714,000.00 1,714,000.00 190 DASOL 4,500,000.00 - - 2,500,000.00 2,500,000.00 - - 500,000.00 500,000.00 - 1,500,000.00 - 500,000.00 - 12,500,000.00 UPGRADING OF IRRIGATION DAM AND CONCRETING OF IRRIGATION CANALS 1,000,000.00 1,000,000.00 CONSTRUCTION OF BRICKWATER AND REHABILITATION OF WHARF 3,000,000.00 3,000,000.00 ESTABLISHMENT OF AND DELARATION OF MANGROVE SANCTUARY 500,000.00 500,000.00 REPAIR/ REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION 500,000.00 500,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,500,000.00 1,500,000.00 EXPANSION OF PIPELINES (SALINTUBIG) 1,000,000.00 1,000,000.00 OFWS REINTEGRATION PROGRAM 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS (TRAININGS) CAVING, HOME STAY, FACILITIES UPDATE 500,000.00 500,000.00 STREAMLINING BUSINESS PERMITS AND LICENSING SYSTEM 1,000,000.00 1,000,000.00 PROCUREMENT OF SALT IODIZATION MACHINE 500,000.00 500,000.00 SKILLS TRAINING PROGRAM ON WELDING 500,000.00 500,000.00 191 INFANTA 1,849,500.00 1,000,000.00 1,300,000.00 500,500.00 3,100,000.00 - - - - 750,000.00 - - - 4,000,000.00 12,500,000.00 PURCHASE OF 2 UNITS MOTORIZE BOAT FISHING BOAT 849,500.00 849,500.00 CONCRETING OF IRRIGATION LINE CANAL @ BRGY DOLIMAN 1,000,000.00 1,000,000.00 PURCHASE OF 6 UNITS HAND TRACTOR WITH TRAILER 500,000.00 500,000.00 PURCHASE OF 12 UNITS - 4"O WATER PUMP WITH BELT-IN 10 HP DIESEL ENGINE, 12 ROLLS 4"O SUCTION & DISCHARGE RUBERIZE PIPE 500,000.00 500,000.00 PURCHASE OF ASSORTED FOREST TREE SEEDLINGS AND HIGH VALUE TREES FOR THE PLANTATION ESTABLISHMENT 130 HAS CBFM REFORESTATION PROJECTS (BRGY. DOLIMAN, BAMBAN, BAYAMBANG) 1,300,000.00 1,300,000.00 PURCHASE OF 786 PCS. OF MONOBLOC ARM CHAIR FOR THE 13 ELEM SCHOOLS 500,500.00 500,500.00 CONSTRUCTION OF CONCRETE CANAL & DRAINAGE SYSTEM @ BRGY POBLACION 500,000.00 500,000.00 CONSTRUCTION OF CONCRETESEA WALL @ SITIO VALLARTA, BRGY POBLACION 1,000,000.00 1,000,000.00 SALINTUBIG LEVEL III EXPANSION OF THE (IWWS) INFANTA WATER WORKS SYSTEM MAIN DISTRIBUTION LINE 2"O BLUE PIPE @ BRGY. BAYAMBANG 1,600,000.00 1,600,000.00 CONSTRUCTION OF ONE (1) UNIT DAY CARE CENTER FOR BRGY PATIMA 750,000.00 750,000.00 CONCRETING OF SINGLE LANE MUNICIPAL ROAD NETWORK 4,000,000.00 4,000,000.00 192 LABRADOR 1,700,000.00 - 2,000,000.00 5,000,000.00 1,000,000.00 - 2,300,000.00 - - 500,000.00 - - - - 12,500,000.00 POST HARVEST FACILITIES 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT - MOTORIZED FISHING BOAT 700,000.00 700,000.00 NATIONAL GREENING PROGRAM 2,000,000.00 2,000,000.00 BASIC EDUCATION PROGRAM - REPAIR/REHABILITATION OF SCHOOL BUILDINGS 5,000,000.00 5,000,000.00 RESCUE EQUIPMENT 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAMS - CONSTRUCTION OF COMMUNAL TOILET 1,300,000.00 1,300,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAMS - UPGRADING OF MEDICAL LABORATORY 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 193 LAOAC 4,200,000.00 - - 500,000.00 - - 500,000.00 - - 2,100,000.00 4,700,000.00 - 500,000.00 - 12,500,000.00 CENTRALIZED PROCESSING AND MARKETING CENTER, FOOD PRODUCTS, VEGETABLES AND FRUITS, MEAT AND POULTRY, FISH PRESERVATION 2,320,000.00 2,320,000.00 REHABILITATION OF CASANESTEBANAN MINI DAM 1,880,000.00 1,880,000.00 MAJOR REPAIR OF OLD BUILDING OF CASTUSU INTEGRATED SCHOOL 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 DAY CARE CENTER CONSTRUCTION 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM THROUGH PROVISION OF CAPITAL ASSISTANCE TO VARIOUS PROJECTS 600,000.00 600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SSF TINDAHANG PINOY 4,700,000.00 4,700,000.00 VINEGAR WITH CHILI (ARTEM PRODUCTION) AND PAPAYA ATSARA (FOOD PROCESSING) 500,000.00 500,000.00 194 LINGAYEN 920,000.00 - - 1,890,000.00 3,690,000.00 - 2,500,000.00 - - 2,500,000.00 1,000,000.00 - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVT.: MOTORIZED FISHING BOAT - 3 UNITS 300,000.00 300,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVT.: FISHING NETS (GILL NETS) - 100 METERS LONG, 100 MESH - 60 UNITS 120,000.00 120,000.00 POST-HARVEST FACILITIES AND EQUIPMENT 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: PROVISION OF SCHOOL FURNITURES 1,890,000.00 1,890,000.00 RESCUE EQUIPMENT - RESCUE BOAT - 1 UNIT,HAND HELD RADIO (ICOM), LIFE VEST - 20 PIECES 620,000.00 620,000.00 FLOOD CONTROL -CANALS & DRAINAGE 3,070,000.00 3,070,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (CONST. OF BHS) 2,500,000.00 2,500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF DAY CARE CENTERS) 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) -MICROENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT - STREAMLINING BUSINESS PERMITS AND LICENSING SYSTEM 1,000,000.00 1,000,000.00 195 MABINI - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 PROVISION OF POTABLE WATER SUPPLY/ ESTABLISHMENT OF MABINI WATER DISTRICT (PHASE 2) 12,500,000.00 12,500,000.00 196 MALASIQUI 1,290,000.00 3,000,000.00 - - 5,580,000.00 - - - - - - - 1,200,000.00 8,430,000.00 19,500,000.00 LIVELIHOOD PROJECT: CATTLE AND GOAT RAISING PROGRAM 600,000.00 600,000.00 DREDGING AND RIPRAPPING OF IRRIGATION CANALS IN BRGY PACUAN 3,000,000.00 3,000,000.00 LIVELIHOOD PROJECT: CATTLE RAISING 690,000.00 690,000.00 CONSTRUCTION OF ONE LANE BAILEY BRIDGE @ MEJIA ST. AND STIO TEBAG AT BRGY. LOKEB SUR 1,500,000.00 1,500,000.00 CONSTRUCTION OF ONE LANE FOOT BRIDGE 2,000,000.00 2,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION 2,080,000.00 2,080,000.00 RECONSTRUCTION OF ONE - LANE ROAD CONNECTING MALIMPEC, ALIAGA AND LASIP 500,000.00 500,000.00 RECONSTRUCTION OF ONE -LANE ROAD CONNECTING BRGY. NANSANGAAN TO AGDAO 670,000.00 670,000.00 PROJECT TO BE IDENTIFIED 7,260,000.00 7,260,000.00 SKILLS TRAINING ON FOOD PROCESSING (EMBOTIDO, LONGANISA, TOCINO) CUM PROVISION OF CAPITAL ASSISTANCE 500,000.00 500,000.00 LIVELIHOOD SKILLS DEVELOPMENT/TRAINING ON BEAUTY CARE AND WELLNESS WITH START-UP KIT AND LIVELIHOOD 700,000.00 700,000.00 197 MANAOAG - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF DRAINAGE CANALS - 198 MANGALDAN - - - 5,530,000.00 500,000.00 - - 750,000.00 - 1,620,000.00 700,000.00 - 3,400,000.00 - 12,500,000.00 BASIC EDUCATION FACILITIES 1,100,000.00 1,100,000.00 GULAYAN SA PAARALAN 120,000.00 120,000.00 ABOT ALAM PROGRAM 500,000.00 500,000.00 BASIC EDUCATION FACILITIES 2,340,000.00 2,340,000.00 GULAYAN SA PAARALAN 130,000.00 130,000.00 BASIC EDUCATION FACILITIES 830,000.00 830,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION/ ABOT-ALAM PROGRAM (PURCHASE OF COMPUTERS, SUPPLEMENTARY FEEDING OF OSHP AND REPRODUCTION OF MODULES FOR OSHP) 500,000.00 500,000.00 GULAYAN SA PAARALAN (IMPROVEMENT OF SCHOOL NURSERY, GARDEN AND LANDSCAPE) 10,000.00 10,000.00 CAPABILITY BUILDING FOR CSO'S 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM - TUPAD 750,000.00 750,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICRO ENTEERPISE DEVT. TRACK 1,620,000.00 1,620,000.00 YAMANG PINOY 700,000.00 700,000.00 SKILLS TRAINING WITH START-UP KIT/LIVELIHOOD FUND 2,000,000.00 2,000,000.00 LIVELIHOOD SKILLS TRAINING FOR THE OFWREINTEGRATION PROGRAM 1,400,000.00 1,400,000.00 199 MANGATAREM 850,000.00 - - - - - 765,000.00 280,000.00 - 3,500,000.00 - - 1,275,000.00 5,830,000.00 12,500,000.00 CONSTRUCTION OF SMALL IMPOUNDING PROJECT 850,000.00 850,000.00 REPAIR OF BARANGAY HEALTH STATION BUILDING 765,000.00 765,000.00 IMPLEMENTATION OF SPECIAL PROGRAM FOR THE EMPLOYMENT OF STUDENTS 280,000.00 280,000.00 ESTABLISHMENT OF DAY CARE CENTER 1,900,000.00 1,900,000.00 CAPITAL ASSISTANCE 1,600,000.00 1,600,000.00 VARIOUS LGSF PROJECTS 5,830,000.00 5,830,000.00 CONCRETE PAVING OF BARANGAY ROAD - CONCRETE PAVING OF BARANGAY ROAD - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONCRETE PAVING OF BARANGAY ROAD - CONCRETE PAVING OF BARANGAY ROAD - CONCRETE PAVING OF BARANGAY ROAD - CONCRETE PAVING OF BARANGAY ROAD - CONCRETE PAVING OF BARANGAY ROAD - CONCRETE PAVING OF BARANGAY ROAD - CONCRETE PAVING OF BARANGAY ROAD - SKILLS TRAINING FOR 4PS OSYS SET. 3 ON COMMERCIAL COOKING/HOUSEKEEPING 637,500.00 637,500.00 SKILLS TRAINING FOR DISADVANTAGED WOMEN (HAIRDRESSING, TUPIG MAKING) SET. 3 637,500.00 637,500.00 200 MAPANDAN 2,031,500.00 - - 612,000.00 1,687,250.00 - 934,463.65 - - 2,125,000.00 729,300.00 - - 4,380,486.35 12,500,000.00 PROVISION OF FARM EQUIPMENTS IN SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVELOPMET (WATER PUMPS - 10 UNITS @ 60,000/UNIT) 510,000.00 510,000.00 PROVISION OF FARM EQUIPMENTS IN SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVELOPMET (MULTI-CROP THRESHER - 4 UNITS @ 60,000 / UNIT , HAND TRACTOR - 5 UNITS @ 60,000 / UNIT) 459,000.00 459,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENTS 637,500.00 637,500.00 MASSIVE VACCINATION OF ANTI-RABIES TO DOGS 425,000.00 425,000.00 PROVISION OF SCHOOL FURNITURE (SEATS W/ ARMCHAIR) 476,000.00 476,000.00 GULAYAN SA PAARALAN 136,000.00 136,000.00 CONSTRUCTION OF DRAINAGE SYSTEM 1,211,250.00 1,211,250.00 DRILLING OF DEEPWEELS (POTABLE WATER) 476,000.00 476,000.00 MATERNITY AND NEWBORN CARE(EQUIPMENT) 934,463.65 934,463.65 CONSTRUCTION OF 2 UNITS DAYCARE CENTER 1,275,000.00 1,275,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR FAMILIES UNDER SUBSISTENCE LEVEL 850,000.00 850,000.00 STREAMLINING BUSINESS PERMITS AND LICENSING SYSTEM 729,300.00 729,300.00 CONSTRUCTION OF CORE LOCAL ROADS 4,380,486.35 4,380,486.35 201 NATIVIDAD 2,500,000.00 - 500,000.00 - 4,824,000.00 - 576,000.00 1,000,000.00 - - 2,500,000.00 - 600,000.00 - 12,500,000.00 IRRIGATION PROJECT 2,500,000.00 2,500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 1,000,000.00 PROVISION OF POTABLE WATER SUPPLY 3,824,000.00 3,824,000.00 RNHEALS/RHMPP 576,000.00 576,000.00 WORKER'S INCOME AUGMENTATION PROGRAM (WIN AP) 1,000,000.00 1,000,000.00 OTOP ESTABLISHED (CASSAVA PRODUCTS) PRODUCT DEVELOPMENT TOOLS, EQUIPMENT AND MACHINERY, PACKAGING AND MARKETING 1,500,000.00 1,500,000.00 BPLS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: SKILLS TRAINING WITH START-UP KITS 600,000.00 600,000.00 202 POZORRUBIO - - - - 3,000,000.00 - 1,500,000.00 - - 1,500,000.00 - - - 6,500,000.00 12,500,000.00 FLOOD CONTROL CONSTRUCTION OF DRAINAGE CANALS 500,000.00 500,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SOURCE 2,500,000.00 2,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM- CONSTRUCTION OF BARANGAY HEALTH STATION 500,000.00 500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION -CAPACITY ENHANCEMENT THROUGH TRAINING ON INTEGRATED MANAGEMENT OF PREGNANCY & CHILDBIRTH 500,000.00 500,000.00 PROCUREMENT OF RHU EQUIPMENT/INSTRUMENT 500,000.00 500,000.00 ENVIRONMENTAL PROTECTION AND COSERVATION: SDANITATION FACILITIES - DISTRIBUTION/INSTALLATION OF SANITARY TOILET MATERIALS 1,500,000.00 1,500,000.00 VARIOUS ROAD PROJECTS 6,500,000.00 6,500,000.00 CONSTRUCTION OF ACCESS ROADS - CONSTRUCTION OF ACCESS ROADS - CONSTRUCTION OF ACCESS ROADS - CONSTRUCTION OF ACCESS ROADS - CONSTRUCTION OF ACCESS ROADS - CONSTRUCTION OF ACCESS ROADS - CONSTRUCTION OF ACCESS ROADS - CONSTRUCTION OF ACCESS ROADS - 203 ROSALES - - - 4,000,000.00 5,000,000.00 - 1,000,000.00 - - - - - - 2,500,000.00 12,500,000.00 REPAIR OF SCHOOL BUILDING 4,000,000.00 4,000,000.00 FLOOD CONTROL 1,500,000.00 1,500,000.00 EVACUATION CUM CAPABILITY BUILDING CENTER 3,500,000.00 3,500,000.00 DENGUE & RABBIES ELIMINATION 1,000,000.00 1,000,000.00 LOCAL ROAD CONSTRUCTION-CONCRETING 2,500,000.00 2,500,000.00 204 SAN CARLOS CITY 7,600,000.00 4,000,000.00 - 2,000,000.00 - - 7,400,000.00 - - 6,000,000.00 3,000,000.00 - - - 30,000,000.00 CATTLE RAISING 1,000,000.00 1,000,000.00 QUAIL FARMING AND QUAIL EGG PRODUCTION 1,600,000.00 1,600,000.00 ORGANIC FERTILIZER PRODUCTION CENTER ESTABLISHMENT 5,000,000.00 5,000,000.00 UPGRADING OF COMMUNAL IRRIGATION SYSTEM AND FACILITIES 4,000,000.00 4,000,000.00 REPAIR OF CLASSROOMS 2,000,000.00 2,000,000.00 CONSTRUCTION OF BARANGAY HEALTH STATIONS AND PROVIDING EQUIPMENTS AND INSTRUMENTS FOR OPB AND DOTS 7,400,000.00 7,400,000.00 CONSTRUCTION OF 6 DAY CARE CENTERS 6,000,000.00 6,000,000.00 CONSTRUCTION OF SAN CARLOS CITY PRODUCT DISPLAY CENTER/OTOP PHASE I 3,000,000.00 3,000,000.00 205 SAN FABIAN - - 500,000.00 - 500,000.00 - 1,700,000.00 - 1,000,000.00 2,160,000.00 2,700,000.00 - 800,000.00 3,140,000.00 12,500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 PURCHASE OF RUBBER BOATS, CHAIN SAWS, LIFE VESTS AND OTHER DISASTER RESCUE EQUIPMENT 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM: (OPB, MCP & TB DOTS PACKAGE) 1,100,000.00 1,100,000.00 TRAINING PROGRAM FOR MUNICIPAL HEALTH PERSONNEL 600,000.00 600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENT OF TOURIST INFORMATION CENTER 1,000,000.00 1,000,000.00 DEVELOPMENT/IMPROVEMENT OF EVACUATION CENTER 2,160,000.00 2,160,000.00 YAMAN PINOY PROGRAM FOR DIFFERENTLY ABLED PERSONS 1,000,000.00 1,000,000.00 ADOPTION/INSTITUTIONALIZING OF BPLS 1,700,000.00 1,700,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 3,140,000.00 3,140,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (EMPLOYMENT FACILITATION TRACK): SKILLS TRAINING FOR THE PANTAWID BENEFICIARIES 800,000.00 800,000.00 206 SAN JACINTO - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 PROJECT TO BE IDENTIFIED 12,500,000.00 12,500,000.00 207 SAN MANUEL 650,000.00 - - 5,000,000.00 1,000,000.00 - - - - 750,000.00 - - - 5,100,000.00 12,500,000.00 AQUA CULTURE DEVELOPMENT 650,000.00 650,000.00 REHABILITATION/REPAIR OF SCHOOL BUILDING 5,000,000.00 5,000,000.00 PROCUREMENT OF DISASTER EQUIPMENT 1,000,000.00 1,000,000.00 UPGRADING OF DAY CARE CENTERS 750,000.00 750,000.00 ARZADON LOCAL CORE ROAD 1,000,000.00 1,000,000.00 SITIO BUTAO-CASANTIAGOAN LOCAL CORE ROAD 1,000,000.00 1,000,000.00 SITIO BATO LOCAL CORE ROAD 1,000,000.00 1,000,000.00 FLORES-CABULUNDAYAN LOCAL CORE ROAD 1,000,000.00 1,000,000.00 TAGUIPORO LOCAL CORE ROAD 600,000.00 600,000.00 CAMPO TRESE LOCAL CORE ROAD 500,000.00 500,000.00 208 SAN NICOLAS 1,000,000.00 - - - 3,850,000.00 - - - - 5,000,000.00 650,000.00 - 2,000,000.00 - 12,500,000.00 PROCUREMENT OF FARM MACHINERIES FOR THE FARM SERVICE PROVIDERS 1,000,000.00 1,000,000.00 CONSTRUCTION OF STANDARD EVACUATION CENTER 3,850,000.00 3,850,000.00 UPGRADING/REPAIR OF DAY CARE CENTERS 2,000,000.00 2,000,000.00 SLP-MICROENTERPRISE DEVELOPMENT 3,000,000.00 3,000,000.00 YAMAN PINOY - BAMBOO HANDICRAFT 650,000.00 650,000.00 SKILLS TRAINING ON CARPENTRY, MASONRY AND STEEL BAR FIXING 1,000,000.00 1,000,000.00 SKILLS TRAINING ON FARM EQUIPMENT AND MOTORCYCLE REPAIR 500,000.00 500,000.00 COMMUNITY BASED SKILLS TRAINING ON SHELDED METAL ARC WELDING NCII AND CONSUMER ELECTRONIC SERVICING NCII 500,000.00 500,000.00 209 SAN QUINTIN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 CONSTRUCTION OF EVACUATION FACILITY - PROCUREMENT OF RESCUE EQUIPMENT - FLOOD CONTROL - 210 SANTA BARBARA 3,767,850.00 - 500,000.00 2,000,000.00 - - 3,152,150.00 - - 580,000.00 2,000,000.00 - 500,000.00 - 12,500,000.00 IRRIGATION PROJECTS (STWS) 767,850.00 767,850.00 INFRASTRUCTURE SUPPORT PROJECT 3,000,000.00 3,000,000.00 NATIONAL GREENING PROGRAM: PROVISION OF FOREST/FRUIT BEARING TREES (MAHOGANY, NAME TREE, STAR APPLE, GUYABANO) 500,000.00 500,000.00 PROVISION OF SCHOOL FACILITIES 750,000.00 750,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 BASIC EDUCATION FACILITIES - REPAIR/REHABILITATION OF CLASSROOMS, PHASE 1 750,000.00 750,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM A. BASIC EQUIPMENTS INSTRUMENTS 2,630,150.00 2,630,150.00 COMMUNITY HEALTH TEAMS (CHT) -TRAININGS, MOB.,IEC MATERIAL 522,000.00 522,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS - REPAIR/UPGRADING OF DAY CARE CENTERS, PHASE I 580,000.00 580,000.00 STREAMLINING BUSINESS PERMITS AND LICENSING SYSTEM 1,000,000.00 1,000,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT - STREAMLINING BUSINESS PERMITS AND LICENSING SYSTEM (TRAINING), PHASE 1 1,000,000.00 1,000,000.00 SKILLS TRAINING ON FOOD PROCESSING WITH STARTUP KIT 500,000.00 500,000.00 211 SANTA MARIA 2,350,000.00 - 500,000.00 1,800,000.00 2,040,000.00 - 750,000.00 - 1,200,000.00 1,860,000.00 - - - 2,000,000.00 12,500,000.00 POST HARVEST FACILITIES 2,350,000.00 2,350,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 REPAIR OF 17 CLASSROOMS 1,800,000.00 1,800,000.00 CONSTRUCTION OF EVACUATION FACILITY 290,000.00 290,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 PURCHASE OF RESCUE EQUIPMENT 750,000.00 750,000.00 BARANGAY HEALTH STATION 750,000.00 750,000.00 PRODUCT DEVELOPMENT 700,000.00 700,000.00 SETTIN UP TOURISM DATABASE 500,000.00 500,000.00 CONSTRUCTION OF BAHAY PAGASA FOR CICL 1,860,000.00 1,860,000.00 CORE LOCAL ROAD CONSTRUCTION 2,000,000.00 2,000,000.00 212 SANTO TOMAS - - - 3,000,000.00 3,000,000.00 - - - - 6,500,000.00 - - - - 12,500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 3,000,000.00 3,000,000.00 CONSTRUCTION OF PUBLIC MARKET 67,803.69 67,803.69 CONSTRUCTION OF PUBLIC MARKET 2,932,196.31 2,932,196.31 CONSTRUCTION OF DAY CARE CENTER 800,000.00 800,000.00 UPGRADING/REPAIR OF DAY CARE CENTERS 600,000.00 600,000.00 CONSTRUCTION OF EVACUATION CENTER 4,100,000.00 4,100,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 213 SISON - - - 1,520,000.00 8,230,000.00 - 1,750,000.00 - - 1,000,000.00 - - - - 12,500,000.00 REPAIR/RHABILITATION OF CLASSROOMS 1,520,000.00 1,520,000.00 PROVISION OF POTABLE WATER SUPPLY (SALINTUBIG) 8,230,000.00 8,230,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM - COMPLETION OF THE 2ND FLOOR, RHU 1,750,000.00 1,750,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 214 SUAL 3,100,000.00 - 1,500,000.00 - 4,300,000.00 - - - - - - - - 3,600,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTOR, PLANTER/SEEDER, HARVESTER, THRESHER, SHELLER, MOTORIZED FISHING BOAT, FISH NETS) 3,100,000.00 3,100,000.00 NATIONAL GREENING PROGRAM 1,500,000.00 1,500,000.00 CONCRETING OF RCBC- SITIO MAYAMAN 1,200,000.00 1,200,000.00 CONCRETING OF LINED DRAINAGE CANAL- POBLACION 3,100,000.00 3,100,000.00 CONCRETING OF BRGYS. BAQUIOEN ACCESS ROAD 1,200,000.00 1,200,000.00 CONCRETING OF BRGY. CAPANTOLAN ACCESS ROAD 1,200,000.00 1,200,000.00 CONCRETING OF BRGY. MACAYCAYAWAN ACCESS ROAD 1,200,000.00 1,200,000.00 215 TAYUG 1,900,000.00 - - 170,000.00 3,170,000.00 - 538,400.00 2,060,000.00 - 2,400,000.00 - - - 2,261,600.00 12,500,000.00 MULTI-PURPOSE PAVEMENTS 1,900,000.00 1,900,000.00 GULAYAN SA PAARALAN 80,000.00 80,000.00 GULAYAN SA PAARALAN 90,000.00 90,000.00 FLOOD CONTROL 3,170,000.00 3,170,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 538,400.00 538,400.00 LIVELIHOOD FOR TRICYCLE DRIVERS (MTTODA) 800,000.00 800,000.00 NEGO KART LIVELIHOOD PROGRAM FOR AMBULANT VENDORS 1,260,000.00 1,260,000.00 REPAIR/UPGRADING OF 12 DAY CARE CENTERS 2,400,000.00 2,400,000.00 CORE LOCAL ROADS CONSTRUCTION/ MAINTENANCE/ REHABILITATION 1,261,600.00 1,261,600.00 CORE LOCAL ROADS CONSTRUCTION/ MAINTENANCE/ REHABILITATION 1,000,000.00 1,000,000.00 216 UMINGAN 6,010,000.00 - - - - - 4,110,000.00 - - 2,380,000.00 - - - - 12,500,000.00 "MAKINA PAG-BYAGAN" (INFRASTRUCTURE SUPPORT TO AGRICULTURE 3,010,000.00 3,010,000.00 "GO ORGANIC UMINGAN" (ORGANIC FERTILIZER PRODUCTION) 1,000,000.00 1,000,000.00 "USAR PARA AGRIKULTURA" (CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENTS) 2,000,000.00 2,000,000.00 "BALAY SALUN-AT TI AWAY" (CONSTRUCTION OF BARANGAY HEALTH STATIONS (10 BHS)) 2,710,000.00 2,710,000.00 "USAR PARA SALUN-AT" (ACQUISITION OF MEDICAL EQUIPMENT/APPARATUS) 1,400,000.00 1,400,000.00 "SAGUT PARA ITI BABASSIT" (REPAIR AND UPGRADING OF DAY CARE CENTERS (20 DCCS)) 1,400,000.00 1,400,000.00 "SAGUT PARA ITI BABASSIT"(CONSTRUCTION OF GROUP HAND W WASHING FACILITIES (49 DCCS)) 980,000.00 980,000.00 217 URBIZTONDO 7,310,000.00 - - - 4,000,000.00 - 540,000.00 - - 650,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 7,310,000.00 7,310,000.00 CONSTRUCTION OF TRADING POST - CONSTRUCTION OF WATER IMPOUNDING RESERVOIR - MECHANICAL DRYER(FLATBED DRYER) - CONSTRUCTION OF SOLAR DRYING PAVEMENT - CONSTRUCTION OF DRAINAGE SYSTEM 1,500,000.00 1,500,000.00 CONSTRUCTION OF EVACUATION FACILITY 2,500,000.00 2,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (MATERNITY AND NEWBORN CARE) 540,000.00 540,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO ENTERPRISE DEV'T - TRACK 1 650,000.00 650,000.00 218 URDANETA CITY - - - - 3,000,000.00 - 1,400,000.00 - - 8,100,000.00 - - - - 12,500,000.00 CONSTRUCTION OF BOX-TYPE DRAINAGE CANAL SYSTEM 2,000,000.00 2,000,000.00 CAPACITY BUILDING FOR CSOS 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM * BASIC EQUIPMENT AND INSTRUMENT (OPD) * BASIC EQUIPMENT AND INSTRUMENT FOR LYING-IN CLINIC * DENTAL CHAIRS FOR CHO I, II, III * CONSTRUCTION/RENOVATION OF LABORATORY AND PURCHASE OF LABORATORY EQUIPMENT 1,400,000.00 1,400,000.00 CONSTRUCTION OF EVACUATION CENTER 7,100,000.00 7,100,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICRO-ENTERPRISE DEVELOPMENT TRACK1) 1,000,000.00 1,000,000.00 219 VILLASIS - - - 1,500,000.00 4,050,000.00 - 1,350,000.00 - - 2,600,000.00 - - - 3,000,000.00 12,500,000.00 REPAIR/REHAB OF VARIOUS SCHOOL CLASSROOM 1,500,000.00 1,500,000.00 CONSTRUCTION OF BARRACA FLOOD WATERWAYS 1,000,000.00 1,000,000.00 CONSTRUCTION OF STANDARD EVACUATION CENTER 3,050,000.00 3,050,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 1,100,000.00 1,100,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 250,000.00 250,000.00 REPAIR/REHAB OF DAY CARE CENTERS 2,100,000.00 2,100,000.00 PROVISION OF ECCD MATERIALS TO DAY CARE CENTERS 500,000.00 500,000.00 CONCRETING OF SAN BLAS-LIPAY ROAD 1,000,000.00 1,000,000.00 CONCRETING OF STO. NINO DOMINGO ST., EXTN. 1,000,000.00 1,000,000.00 CONCRETING/WIDENING OF SAN ANDRES ST 1,000,000.00 1,000,000.00 REGION II 235,573,672.50 11,155,000.00 34,393,750.00 82,178,408.00 289,618,756.00 2,500,000.00 87,363,410.00 23,444,000.00 43,074,986.00 160,942,600.00 55,906,500.00 3,000,000.00 8,095,000.00 121,975,317.50 1,159,221,400.00 BATANES 5,690,000.00 1,500,000.00 500,000.00 2,410,000.00 50,200,000.00 - 542,000.00 - 4,458,000.00 3,500,000.00 700,000.00 - - 5,500,000.00 75,000,000.00 220 BASCO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 REHABILITATION AND DEVELOPMENT OF WATER AND SANITATION FACILITIES (PHASE II) 12,500,000.00 12,500,000.00 221 ITBAYAT - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF WATER TREATMENT FACILITY & UPGRADE WATER SUPPLY SYSTEM 12,500,000.00 12,500,000.00 222 IVANA 5,190,000.00 - 500,000.00 810,000.00 3,500,000.00 - - - - 2,500,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 5,190,000.00 5,190,000.00 CONSTRUCTION OF PAYAMAN IRRIGATION - GOAT PRODUCTION - ORGANIC FERTILIZER PRODUCTION - NATIONAL GREENING PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 REHAB.OF SCHOOL BLDG/IVANA ELEM.SCHOOL 800,000.00 800,000.00 PROCUREMENT OF RESCUE EQUIPMENT 3,500,000.00 3,500,000.00 CONSTRUCTION OF BAHAY-PAGASA FOR CICL 2,500,000.00 2,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 223 MAHATAO - 1,500,000.00 - - 1,500,000.00 - - - 4,000,000.00 - - - - 5,500,000.00 12,500,000.00 LAYING-OUT AND INSTALLATION OF PIPING NETWORK FOR IRRIGATION FACILITY 1,500,000.00 1,500,000.00 PROCUREMENT OF EQUIPMENT (FOR DRRM AND SWMP PROGRAMS) 1,500,000.00 1,500,000.00 TOURISM DEVELOPMENT PROGRAM: CAPABILITY TRAINING AND PROVISION OF TOURISM FACILITIES 3,500,000.00 3,500,000.00 TOURISM DEVELOPMENT PROGRAM: PROVISION OF DIRECTIONAL SIGNAGES 500,000.00 500,000.00 PROJECT TO BE DETERMINED 5,500,000.00 5,500,000.00 224 SABTANG 500,000.00 - - 1,600,000.00 7,700,000.00 - 542,000.00 - 458,000.00 1,000,000.00 700,000.00 - - - 12,500,000.00 MOTORIZED FISHING BOAT 500,000.00 500,000.00 REHABILITATION OF CLASSROOMS 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 PROVISION OF POTABLE WATER SUPPLY 5,700,000.00 5,700,000.00 CONSTRUCTION OF CANALS/DRAINAGE/FC 2,000,000.00 2,000,000.00 RN/RM HEALS 542,000.00 542,000.00 ESTABLISHMENT OF PUBLIC RESTROOM 458,000.00 458,000.00 CONSTRUCTION OF DAY CARE CENTER 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (YAMAN PINOY) 700,000.00 700,000.00 225 UYUGAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 REHAB/EXPANSION/UPGRADING OF LEVEL III WATER SUPPLY SYSTEM - CONSTRUCTION OF ONE UNIT WATER TANK RESERVOIR - CAGAYAN 80,722,072.50 - 11,500,000.00 31,071,534.00 91,037,150.00 2,000,000.00 17,707,010.00 2,000,000.00 24,204,486.00 39,490,790.00 12,408,000.00 - 2,700,000.00 46,640,357.50 361,481,400.00 226 ABULUG 4,700,000.00 - - 1,450,000.00 2,000,000.00 - 1,310,000.00 - - 3,040,000.00 - - - - 12,500,000.00 PROVISION OF STWPUMPS FOR IRRIGATION 1,800,000.00 1,800,000.00 INFRA SUPPORT ( TO AGRICULTURE & FISHERY PRODUCTION) (CONSTRUCTION OF FISHERY HATCHERY) 1,500,000.00 1,500,000.00 SEED ASSISTANCE (ACQUISITION OF CERTIFIED SEEDS) 1,400,000.00 1,400,000.00 GULAYAN SA PAARALAN 250,000.00 250,000.00 REPAIR OF A 2 CL ELEM SCHOOL BUILDING 1,200,000.00 1,200,000.00 UPGRADING OF ABULUG RIVERSIDE WATER SYSTEM 2,000,000.00 2,000,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 740,000.00 740,000.00 TRAINING FOR HEALTH PROVIDERS ON MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION, RABIES ELIMINATION, LEPROSY CONTROL, TB CONTROL, ST/HIV AND AIDS PREVENTION, DENGUE CONTROL 570,000.00 570,000.00 PROTECTIVE SERVICE INFRA PROJECT (CONSTRUCTION OF EVACUATION CENTER) 3,040,000.00 3,040,000.00 227 ALCALA 8,050,000.00 - 500,000.00 - 1,400,000.00 - - - - - - - - 2,550,000.00 12,500,000.00 IMPROVEMENT/UPGRADING OF IRRIGATION FACILITIES (REHAB OF SWIP) 7,020,000.00 7,020,000.00 CONSTRUCTION OF MULTI PURPOSE DRYING PAVEMENT 1,030,000.00 1,030,000.00 SOLID WASTE MANAGEMENT PROGRAM 500,000.00 500,000.00 INSTALLATION OF LEVEL 1 POTABLE WATER SYSTEM 1,400,000.00 1,400,000.00 REHABILITATION OF CORE LOCAL ROADS 2,550,000.00 2,550,000.00 228 ALLACAPAN 900,022.50 - - 3,025,120.00 4,496,500.00 - - - - - - - - 4,078,357.50 12,500,000.00 ESTABLISHMENT & CONSTRUCTION OF TRADING POSTS 900,022.50 900,022.50 REHAB. OF CLASSROOMS 3,025,120.00 3,025,120.00 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM 4,496,500.00 4,496,500.00 CONTINUATION OF THE CONCRETING OF DAAN-ILI-PACAC OVERFLOWROAD 4,078,357.50 4,078,357.50 229 AMULUNG 500,000.00 - 500,000.00 490,000.00 2,600,000.00 - - - - 5,210,000.00 - - 700,000.00 2,500,000.00 12,500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN 490,000.00 490,000.00 SALINTUBIG 2,000,000.00 2,000,000.00 ARTESIAN WELLS 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR INDIGENTS WHO ARE NOT 4PS BENEFICIARIES 2,000,000.00 2,000,000.00 CONSTRUCTION OF DCC WITH HAND WASHING FACILITY (WITH CMPLETE SET OF SOAP AND FLUORIDE GEL TOOTHPASTE ) 3,210,000.00 3,210,000.00 ACCESS ROAD/ CORE LOCAL ROADS 2,500,000.00 2,500,000.00 SKILLS TRAINING FOR SELF EMPLOYMENT FOR LIVELIHOOD AND ENTREPRENEURSHIP (CAPACITY BUILDING/ YAMAN PINOY FOR VULNERABLE SECTORS(WOMEN, YOUTHS,PWD, SOLO PARENTS, FARMERS, IPS, RR, 4PS) 700,000.00 700,000.00 230 APARRI 2,358,000.00 - - - 4,800,000.00 - - - - 720,000.00 - - - 4,622,000.00 12,500,000.00 FOUR WHEEL TRACTOR 1,656,000.00 1,656,000.00 MOTORIZED FISHING BOAT (2 UNITS) 702,000.00 702,000.00 CONSTRUCTION OF EVACUATION CENTER 4,800,000.00 4,800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR SENIOR CITIZENS 720,000.00 720,000.00 PROJECT TO BE DETERMINED 4,622,000.00 4,622,000.00 231 BAGGAO - - 3,500,000.00 - 6,425,000.00 - - - - 1,000,000.00 1,575,000.00 - - - 12,500,000.00 NATIONAL GREENING PROGRAM - RUBBER TREE PLANTATION (MUNICIPAL WIDE) 1,500,000.00 1,500,000.00 NATIONAL GREENING PROGRAM (PATTAGA PLANTATION) 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM (ADOPT AN UPLAND FARMER PROGRAM) 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 6,425,000.00 6,425,000.00 SALIN TUBIG - SPRING DEVELOPMENT LEVEL 1 - PURCHASE OF SEARCH AND RESCUE EQUIPMENT - CONSTRUCTION OF DRAINAGE CANAL AT POBLACION AND SAN JOSE - ESTABLISHMENT OF FOOTBRIDGE AT SANTA TERESITA MARGARITA (CONNECTING SITIO DAPIR - MANSARONG) - ESTABLISHMENT OF DEEP WELL LEVEL 1 (40 MTRS) - MASISIT, ASASSI - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONCRETING OF BRIDGE APPROACH OF IBULO - TAGUING BRIDGE - PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS - ESTABLISHMENT OF WOMEN/CHILDREN CRISIS CENTER 1,000,000.00 1,000,000.00 ESTABLISHMENT OF PRODUCTION CENTER FOR WEAVING (BAYONG, BAGS, MATS, SLIPPERS, ETC.) WITH FACILITIES 1,575,000.00 1,575,000.00 232 BALLESTEROS - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CONCRETING OF CORE LOCAL ROADS 12,500,000.00 12,500,000.00 233 BUGUEY 3,755,000.00 - - 2,385,000.00 3,660,000.00 - 1,350,000.00 - 1,350,000.00 - - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,755,000.00 3,755,000.00 INFRASTRACTURE SUPPORT TO AGRICULTURE,FISHERY PRODUCTION AND DEVELOPMENT (MOTORIZED FISHING BOATS/NETS FISH SEED PRODUCTION FACILITY - (MULTI SPECIES HATCHERY AND NUSERY)). - COLD STORAGE FACILITIES - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENT - AGRI-FISHERY TRAININGS - MARINE RESERVE AND FISH SANCTUARIES - ORGANIC FERTILIZER PRODUCTION - REPAIR/REHABILITATION OF CLASSROOMS 2,385,000.00 2,385,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT(SALINTUBIG) -PROVISION OF POTABLE WATER SUPPLY 3,660,000.00 3,660,000.00 CAPACITY BUILDING FOR CSOS - BIRTHING FACILITY 1,350,000.00 1,350,000.00 CONSTRUCTION OF TOURISM INFORMATION CENTER AND PASALUBONG CENTER (TOURISM FACILITY) 1,350,000.00 1,350,000.00 234 CALAYAN 1,500,000.00 - - - 7,000,000.00 2,000,000.00 - - - 2,000,000.00 - - - - 12,500,000.00 MOTORIZED FISHING BOAT (SINGLE ENGINE, DIESEL) 1,500,000.00 1,500,000.00 COMMUNITY WATER SYSTEM 2,000,000.00 2,000,000.00 FLOOD CONTROL, DRAINAGE CANAL, RIVER AND SEA WALL 3,000,000.00 3,000,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 SITIO ELECTRIFICATION 2,000,000.00 2,000,000.00 CORE SHELTER PROJECT 2,000,000.00 2,000,000.00 235 CAMALANIUGAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 REHABILITATION OF LEVEL III WATER SYSTEM 12,500,000.00 12,500,000.00 236 CLAVERIA 3,300,000.00 - - - 5,000,000.00 - - - - 3,000,000.00 - - - 1,200,000.00 12,500,000.00 IRRIGATION PROJECTS (SIP/OSP) 1,500,000.00 1,500,000.00 INFRA SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION DEV'T. (MOTORIZED FISHING BOAT) 800,000.00 800,000.00 POST HARVEST FACILITY- MECHANICAL DRYER 1,000,000.00 1,000,000.00 DRRM- FLOOD CONTROL 5,000,000.00 5,000,000.00 SLP- EMPLOYMENT FACILITAION TRAK 1,500,000.00 1,500,000.00 SLP- MICROENTERPRISE DEV'T. TRAK 1,500,000.00 1,500,000.00 CORE LOCAL ROAD REHABILITATION, MAINTENANCE AND CONSTRUCTION 1,200,000.00 1,200,000.00 237 ENRILE 4,380,000.00 - - 750,000.00 2,500,000.00 - 3,250,000.00 - - 1,620,000.00 - - - - 12,500,000.00 MECHANICAL DRYER 1,580,000.00 1,580,000.00 4WHEEL TRACTOR 2,800,000.00 2,800,000.00 REPAIR OF SCHOOL FACILITIES 500,000.00 500,000.00 GULAYAN SA PAARALAN 250,000.00 250,000.00 EMERGENCY RESCUE VEHICLES 2,500,000.00 2,500,000.00 ESTABLISHMENT OF BARANGAY HEALTH STATION 2,500,000.00 2,500,000.00 MASS TREATMENT-DEWORMING OF ALL SCHOOL AGE CHILDREN, KINDERGARTEN TO GRADE VI 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTER 1,620,000.00 1,620,000.00 238 GATTARAN - - - 5,000,000.00 7,500,000.00 - - - - - - - - - 12,500,000.00 REHABILITATION OF SCHOOL BUILDINGS 5,000,000.00 5,000,000.00 RIVER CONTROL PROJECT 7,500,000.00 7,500,000.00 239 GONZAGA 5,000,000.00 - 1,500,000.00 - - - 2,000,000.00 - - 2,500,000.00 - - 1,500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 5,000,000.00 5,000,000.00 ORGANIC FERTILIZER PRODUCTION - CORAL TRANSPLANTATION IN THE ESTABLISHED MARINE PROTECTED AREA - UPSCALING OF THE INTEGRATED FISHERY PRODUCTS PROCESSING LABORATORY AT THE FISHERFOLK CENTER - BAMBOO PRODUCTION 1,500,000.00 1,500,000.00 STI/HIV AIDS PREVENTION AND CREATION OF HYGIENIC CLINIC 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,500,000.00 2,500,000.00 SKILLS TRAINING IN WELDING, BEAUTY CARE AND BREAD AND PASTRY PRODUCTION (CFPJ ON THE MOVE PROJECT LIVELIHOOD SKILLS TRAINING (RATTAN WEAVING, WELDING, COSMETOLOGY, BAKING, SOFTBROOM AND NOVELTY ITEMS MAKING) 1,500,000.00 1,500,000.00 240 IGUIG - - - - 4,461,200.00 - 3,538,800.00 - - - - - - 4,500,000.00 12,500,000.00 REHABILITATION OF LEVEL III WATER SYSTEM 3,461,200.00 3,461,200.00 PURCHASE OF RESCUE EQUIPMENTS 1,000,000.00 1,000,000.00 COMPLETION OF BASIC EMERGENCY OBSTETRIC NEBORN CARE (BEMONC) BUILDING (2ND & 3RD FLOOR) 3,538,800.00 3,538,800.00 CONCRETING OF DIFFERENT BARANGAY ROADS 4,500,000.00 4,500,000.00 241 LAL-LO 2,544,550.00 - - - 4,291,450.00 - 1,064,000.00 - 1,100,000.00 - 2,500,000.00 - - - 11,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,544,550.00 2,544,550.00 POST-HARVEST FACILITIES AND EQUIPMENTS(MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT) - HOG RAISING/FISH POND DEV'T-SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENT - ORGANIC FERTILIZER PRODUCTION - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER 4,291,450.00 4,291,450.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,064,000.00 1,064,000.00 CONSTRUCTION OF PASALUBONG CENTER 1,100,000.00 1,100,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENT OF FOOD PROCESSING CENTER (SHARED SERVICE FACILITY) 2,500,000.00 2,500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) - 242 LASAM 1,000,000.00 - - 1,500,000.00 10,000,000.00 - - - - - - - - - 12,500,000.00 ACQUISITION OF RICE TRANSPLANTER 1,000,000.00 1,000,000.00 REHABILITATION OF SCHOOL FACILITIES (REPAIR OF SCHOOL BUILDING) 1,500,000.00 1,500,000.00 VARIOUS PROJECTS 10,000,000.00 10,000,000.00 CONSTRUCTION OF WATER SYSTEMS (PHASE 01) LEVEL II - CONSTRUCTION OF SMALL CONCRETE BRIDGE - CONSTRUCTION OF EVACUATION CENTER (PHASE 01) - PROCUREMENT OF RESCUE EQUIPMENTS - 243 PAMPLONA 1,500,000.00 - - 6,600,000.00 2,900,000.00 - - 1,500,000.00 - - - - - - 12,500,000.00 MOTORIZED FISHING BOATS WITH FISH NET 1,500,000.00 1,500,000.00 REPAIR OF CLASSROOMS 6,600,000.00 6,600,000.00 RESCUE EQUIPMENT 2,900,000.00 2,900,000.00 INTEGRATED LIVELIHOOD PROGRAM/WORKERS INCOME) AUGMENTATION PROGRAM 1,500,000.00 1,500,000.00 244 PEABLANCA 2,000,000.00 - 5,000,000.00 - 2,980,000.00 - 1,294,210.00 - - 1,225,790.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION - VERMI COMPOSTING PROJECT 1,000,000.00 1,000,000.00 MANGO AND OTHER FRUIT PROCESSING FACILITY CUM CAPACITY & SKILLS DEVELOPMENT PROGRAMS 1,000,000.00 1,000,000.00 AGROFORESTRY DEVELOPMENT 1,500,000.00 1,500,000.00 TROPICAL FRUITS PRODUCTION (ASEXUALLY PROPAGATED) 1,000,000.00 1,000,000.00 AGROFORESTRY NURSERY ESTABLISHMENT 1,500,000.00 1,500,000.00 WATERSHED REHABILITATION THRU REFORESTATION/ENRICHMENT PLANTING 1,000,000.00 1,000,000.00 PROCUREMENT OF RESCUE VEHICLES AND EQUIPPING OF RESCUE 24 2,980,000.00 2,980,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,294,210.00 1,294,210.00 PROTECTIVE SERVICES : CONSTRUCTION/REPAIR AND UPGRADING OF DAY CARE CENTERS AND PROVISION OF ECCD MATERIALS FOR DCCS 1,225,790.00 1,225,790.00 245 PIAT 3,034,500.00 - - 1,474,500.00 823,000.00 - 500,000.00 - - 2,705,000.00 823,000.00 - - 3,140,000.00 12,500,000.00 CONCRETE IRRIGATION CANAL (ASIGA-SWIP,CALAOAGAN SWIP) 510,000.00 510,000.00 SHALLOWTUBE WELL & OPEN SOURCE PUMP 648,000.00 648,000.00 PROCUREMENT OF THRESHER & CORN SHELLER 699,000.00 699,000.00 MULTI PURPOSE DRYING PAVEMENT 585,000.00 585,000.00 PROCUREMENT OF DISC HARROW& PLOW 592,500.00 592,500.00 REHABILITATION/REPAIR OF CLASSROOMS 1,474,500.00 1,474,500.00 OPEN MARKET BUILDING 823,000.00 823,000.00 REPAIR/IMPROVEMENT OF BRGY HEALTH STATIONS 500,000.00 500,000.00 REPAIR/UPGRADING OF 8 DAY CARE CENTERS 855,000.00 855,000.00 STANDARD EVACUATION CENTER(WITH TOILETS FOR MEN,WOMEN AND PWDS)AT PNHS 1,350,000.00 1,350,000.00 MICROENTERPRISE DEVELOPMENT TRACK(4P'S) 500,000.00 500,000.00 PASALUBONG CENTER 823,000.00 823,000.00 CONCRETE ROAD 3,140,000.00 3,140,000.00 246 RIZAL - - - - - - - - 12,500,000.00 - - - - - 12,500,000.00 CONSERVE, PRESERVE HISTORICAL LANDMARKS LIKE JAPANESE TUNNEL, OLD SPANISH BRIDGE, HORNO 500,000.00 500,000.00 DEVELOPMENT OF BIUAG AND MALANA VIEWDECK 11,500,000.00 11,500,000.00 DEVELOPMENT OF LITTAUA GROVE AND OLD MALAUEG CHURCH 500,000.00 500,000.00 247 SANCHEZ-MIRA 3,210,000.00 - 500,000.00 190,000.00 1,700,000.00 - - - - 2,250,000.00 2,000,000.00 - 500,000.00 2,150,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,210,000.00 3,210,000.00 ESTABLISHMENT OF 1 UNIT ORGANIC FERTILIZER PRODUCTION - CONSTRUCTION OF SWIP'S - ACQUISITION OF HAND TRACTOR (TURTLE TYPE) - NATIONAL GREENING PROGRAM 500,000.00 500,000.00 ESTABLISHMENT OF GULAYAN SA PAARALAN 190,000.00 190,000.00 CONSTRUCTION AND MAINTENANCE OF DRAINAGE SYSTEM 700,000.00 700,000.00 SPRING DEVELOPMENT 1,000,000.00 1,000,000.00 MAINTENANCE AND REHABILITATION OF DAY CARE CENTERS IN MINANGA AND PUREG 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR SENIOR CITIZENS 650,000.00 650,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR MEN AND WOMEN 1,000,000.00 1,000,000.00 TECHNICAL EDUCATION AND SKILLS DEVELOPMENT PROGRAMS FOR WOMEN GROUPS AND ASSOCIATIONS IN BEAUTY CARE, HAIR DRESSING AND FOOD PROCESSING (RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM) 1,000,000.00 1,000,000.00 ESTABLISHMENT OF PRODUCTION CENTER (OTOP, PASALUBOG, ETC.) 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION MAINTENANCE AND REHABILITATION 2,150,000.00 2,150,000.00 ESTABLISHMENT OF YAMAN PINOY 500,000.00 500,000.00 248 SANTA ANA 2,640,000.00 - - - - - 1,000,000.00 500,000.00 - 6,860,000.00 1,500,000.00 - - - 12,500,000.00 POST HARVEST FACILITIES 740,000.00 740,000.00 ORGANIC FERTILIZER PRODUCTION 1,400,000.00 1,400,000.00 PLANT NURSERY AND CONCRETE BOXES FOR COMPOSTING 500,000.00 500,000.00 MATERNAL, NEONATAL, CHILD HEALTH & NUTRITION PREVENTION OF DISEASES AND PROMOTION OF HEALTH, TRAINING OF HEALTH PROVIDERS TO EMERGENICES AND DISASTERS 1,000,000.00 1,000,000.00 OFWREINTEGRATION PROGRAM 500,000.00 500,000.00 REPAIR/UPGRADING OF DAY CARE CENTER 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 STARTER KIT 560,000.00 560,000.00 NEGO CART 600,000.00 600,000.00 "AGTA LITERACY ON FOODS AND LIVELIHOOD PROGRAM"(AGLIFOLIP) 1,500,000.00 1,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS BASURA KO KABUHAYAN KO (B+K3) 3,000,000.00 3,000,000.00 SANTA ANA RIC LIGHT HOUSE/RIC DISPLAYED PRODUCTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF PASALUBONG CENTER AND TOURISM CENTER 500,000.00 500,000.00 249 SANTA PRAXEDES 6,100,000.00 - - - - - 500,000.00 - 4,900,000.00 500,000.00 500,000.00 - - - 12,500,000.00 CONSTRUCTION OF TRAMLINES 1,500,000.00 1,500,000.00 CONSTRUCTION OF MULTI PURPOSE DRYING PAVEMENT 800,000.00 800,000.00 MIARINE RESERVE AND FISH SANCTUARIES 500,000.00 500,000.00 SMALL SCALE IRRIGATION PROJECT 2,500,000.00 2,500,000.00 ACQUISITION OF HAND TRACTOR (TURTLE TYPE) 800,000.00 800,000.00 COMMUNITY HEALTH TEAM (CHT)MOBILIZATION INFECTIONS DISEASES - RABIES ELIMINATION, TUBERCOLOSIS CONTROL, STI/HIV AND AIDS PREVENTION, DENGUE CONTROL, RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 500,000.00 500,000.00 PORTABAGA FALLS PARK AND RESORT IMPROVEMENT 4,900,000.00 4,900,000.00 PROTECTIVE SERVICES INFRASTRUCTURE ENHANCEMENT PROGRAM 500,000.00 500,000.00 PRODUCTION AND DISPLAY CENTER, MAINTENANCE AND PROTECTION OF SARAKAT PLANTATION 500,000.00 500,000.00 250 SANTA TERESITA 7,020,000.00 - - 4,106,914.00 - - - - 854,486.00 - 500,000.00 - - - 12,481,400.00 ORGANIC AGRI-TRAINING 500,000.00 500,000.00 CANAL LINING 1,000,000.00 1,000,000.00 MULTI-PURPOSE DRYING PAVEMENT 2,000,000.00 2,000,000.00 TILAPIA HATCHERY 820,000.00 820,000.00 PALAY SHED 1,800,000.00 1,800,000.00 ORGANIC FERTILIZER PRODUCTION 900,000.00 900,000.00 GULAYAN SA PAARALAN (ELEMENTARY/HIGHSCHOOL) 150,000.00 150,000.00 PROVISION OF SCHOOL FACILITIES AND EQUIPMENT 650,000.00 650,000.00 REPAIR/MAINTENANCE OF SCHOOL BUILDING 3,306,914.00 3,306,914.00 LAGUNA DE CAGAYAN TOURISM DEVELOPMENT AND PROMOTIONS 854,486.00 854,486.00 LIVELIHOOD (CHARCOAL MAKING OUT OF RICE HULLS ) 500,000.00 500,000.00 251 SANTO NIO - - - - - - - - - 3,660,000.00 1,440,000.00 - - 7,400,000.00 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 3,660,000.00 3,660,000.00 SHARED SERVICE FACILITY (ESTABLISHMENT OF SQUASH) PROCESSING FACILITY) 1,440,000.00 1,440,000.00 CORE LOCAL ROAD CONSTRUCTION 7,400,000.00 7,400,000.00 252 SOLANA 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 AGRICULTURAL TRADING CENTER (WAREHOUSE, TRUCKSCALE, MULTI-PURPOSE PAVEMENT) 11,437,500.00 11,437,500.00 ORGANIC NATURAL FARMING INPUTS PRODUCTION 1,062,500.00 1,062,500.00 253 TUAO 1,000,000.00 - - 1,000,000.00 4,000,000.00 - - - 3,500,000.00 1,000,000.00 - - - 2,000,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 REPAIR OF 5-CLASSROOMS AT EAST DISTRICT 500,000.00 500,000.00 REPAIR OF 2 HOME ECONOMICS BLDGS AT WEST DISTRICT 500,000.00 500,000.00 CONSTRUCTION OF DRAINAGE CANALS/SYSTEM EAST & WEST 4,000,000.00 4,000,000.00 DEVELOPMENT/IMPROVEMENT OF CASSILY LAKE & RESORT, BELFRY AND KRISTO REY PARK, SOLIDARITY PARK (LOCAL TOURISM DEVELOPMENT PROJECTS) 3,500,000.00 3,500,000.00 PROTECTIVE SERVICES - CAPABILITY BUILDING - PROVISION OF ECCD LEARNING MATERIAL FOR DAY CARE CHILDREN 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM -MICRO ENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 CONCRETING OF MUNICIPAL ROAD 2,000,000.00 2,000,000.00 254 TUGUEGARAO CITY 3,730,000.00 - - 3,100,000.00 - - 1,900,000.00 - - 2,200,000.00 1,570,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,730,000.00 3,730,000.00 REHABILITATION OF GREENHOUSE PROJECT - 4WD TRACTOR - POST HARVEST FACILITIES (FARM MECHANIZATION FACILITIES) - ORGANIC AGRICULTURE - ALTERNATIVE LEARNING SYSTEM INSTRUCTIONAL IMPROVEMENT & DEVELOPMENT (ALSIID) 700,000.00 700,000.00 GULAYAN SA PAARALAN 340,000.00 340,000.00 PROVISION OF SCHOOL ARMCHAIRS/FURNITURE 700,000.00 700,000.00 REPAIR OF CLASSROOMS 1,360,000.00 1,360,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 PROVISION OF EQUIPMENT FOR THE OPERATIONS CENTER (OPCEN)- CITY EPIDEMIOLOGIC & SURVEILLANCE UNIT (CESU) OF THE CITY HEALTH 500,000.00 500,000.00 REHABILITATION AND UPGRADING OF BARANGAY HEALTH STATIONS 900,000.00 900,000.00 CENTER AS TEMPORARY SHELTER FOR CICL AND VAWC 1,000,000.00 1,000,000.00 CAPABILITY BUILDING 500,000.00 500,000.00 LIVELIHOOD PROGRAM 700,000.00 700,000.00 PASALUBONG CENTER 820,000.00 820,000.00 ONE BARANGAY, ONE LIVELIHOOD (OBOL) 750,000.00 750,000.00 ISABELA 104,060,600.00 8,155,000.00 10,980,000.00 29,916,874.00 90,788,756.00 - 44,939,700.00 10,090,000.00 8,360,000.00 89,575,810.00 32,098,500.00 - 4,395,000.00 27,439,760.00 460,800,000.00 255 ALICIA 2,800,000.00 - - - - - 7,200,000.00 - - 2,500,000.00 - - - - 12,500,000.00 CONSTRUCTION OF BAGSAKAN CENTER 2,000,000.00 2,000,000.00 COLD STORAGE FACILITIES AND VANS 800,000.00 800,000.00 BIRTHING CENTER 2,800,000.00 2,800,000.00 PROVISION OF RHU EQUIPMENTS 1,000,000.00 1,000,000.00 RENOVATION OF BARANGAY HEALTH STATIONS 3,400,000.00 3,400,000.00 REHABILITATION OF DAY CARE CENTERS 1,500,000.00 1,500,000.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DAY CARE CENTERS 500,000.00 500,000.00 256 ANGADANAN 2,600,000.00 600,000.00 600,000.00 800,000.00 1,500,000.00 - 1,500,000.00 - - 2,150,000.00 2,750,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,350,000.00 1,350,000.00 CONSTRUCTION-MULTI-PURPOSE DRYING PAVE-MENTS - ACQUISITION - REVERSIBLE AIRFLOWBIN DRYER - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENT- ORGANIC FERTILIZER PRODUCTION - ACQUISITION OF MOTORIZED BOATS WITH NETS 500,000.00 500,000.00 ESTABLISHMENT OF IRRIGATION SYSTEM 600,000.00 600,000.00 CONSTRUCTION OF SLAUGHTERHOUSE 750,000.00 750,000.00 SUPPORT TO NGP(PLANTING KAWAYAN PROPAGULES ALONG RIVER BANKS, STREAMBANKS) 600,000.00 600,000.00 REPAIR/REHABILITATION OF SCHOOL BUILDINGS 600,000.00 600,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 CONSTRUCTION OF EVACUATION CENTER OF LGU-ANGADANAN 1,500,000.00 1,500,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION WITH BIRTHING FACILITY 1,500,000.00 1,500,000.00 SLP - MICRO ENTERPRISE DEVT TRACK 1,000,000.00 1,000,000.00 SLP - MICROFINANCING (BIGASAN NG BAYAN) 650,000.00 650,000.00 CONTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 SHARED SERVICE FACILITY FOR PROCESSING OF VARIOUS PRODUCTS 2,000,000.00 2,000,000.00 ESTABLISHMENT OF OTOP STORE EXPRESS 750,000.00 750,000.00 257 AURORA 800,000.00 - - 3,036,000.00 4,742,000.00 - 2,088,000.00 - - 2,634,000.00 - - - - 13,300,000.00 POST HARVEST FACILITIES - MULTI-PURPOSE DRYING PAVEMENT (MPDP) 800,000.00 800,000.00 REPAIR AND REHABILITATION OF CLASSROOMS 3,036,000.00 3,036,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY (LEVEL I) 1,260,000.00 1,260,000.00 VARIOUS DILG PROJECTS 3,482,000.00 3,482,000.00 MDG RELATED - CONSTRUCTION OF FLOOD CONTROL - CONSTRUCTION OF PUBLIC MARKET STALLS - HEALTH FACILITIES ENHANCEMENT PROGRAM A) REPAIR OF MAIN HEALTH CENTER, B) CONSTRUCTION AND REPAIR OF BARANGAY HEALTH STATION (BHS) 1,540,000.00 1,540,000.00 TRAINING HEALTH PROVIDERS ON THE FF PROGRAMS:A) BASIC EMERGENCY OBSTETRIC AND NEWBORN CARE (BEMONC), B) COMMUNITY HEALTH TEAM (CHT), C) RABIES ELIMINATIONPARTNERS, D) LEPROSY, E) TB CONTROL, F) STI/HIV AND AIDS PREVENTION, G) DENGUE CONTROL, H) HEALTH EMERGENCY MANAGEMENT, 548,000.00 548,000.00 SUSTAINABLE LIVELIHOOD PROGRAM -MICROENTERPRISE DEVELOPMENT TRACK-SEA K 1,000,000.00 1,000,000.00 INFRASTRUCTURE SERVICES - CONSTRUCTION & REPAIR OF DAY CARE CENTERS 1,634,000.00 1,634,000.00 258 BENITO SOLIVEN 5,252,000.00 - - 3,973,000.00 - - 2,275,000.00 - - 1,000,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 5,252,000.00 5,252,000.00 PURCHASE OF 1 UNIT FWTRACTOR - CONSTRUCTION OF FLAT BED DRYER WITH GRAIN SHED - CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT - SCHOOL BUILDING REPAIR 3,643,000.00 3,643,000.00 GULAYAN SA PAARALAN 330,000.00 330,000.00 TRAINING OF RHU STAFF ON DIFFERENT DOH PROGRAMS 507,000.00 507,000.00 PROCUREMENT OF LABORATORY AND DENTAL EQUIPMENT 520,000.00 520,000.00 RHU RENOVATION/REHABILITATION 1,248,000.00 1,248,000.00 CONCRETING OF PATHWAY FOR SENIOR CITIZENS 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 259 BURGOS 4,600,000.00 - 600,000.00 2,200,000.00 1,500,000.00 - 1,400,000.00 - - 2,200,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,600,000.00 4,600,000.00 IRRIGATION PROJECTS OPER SOURCE PUMP (OSP) - INFRA.SUPPORT TO AGRI.& FISHERY PRODUCT-ION & DEVELOPMENT (THRESHER & HAND TRACTOR) - POST HARVEST FACILITIES & EQUIPTMENT (MECHANICAL DRYER) - ORGANIC FERTILIZER PRODUCTION - NATIONAL GREENING PROJECT (NGP) 600,000.00 600,000.00 BASIC FACILITIES(REPAIR/REHAB OF CLASSROOM) 2,200,000.00 2,200,000.00 EVACUATION CENTER 1,500,000.00 1,500,000.00 HEALTH FACILITATION ENHANCEMENT 1,400,000.00 1,400,000.00 PROTECTIVE SERVICES (REPAIR/UPGRADING OF DAY CARE CTRS) 1,200,000.00 1,200,000.00 SUSTAINABLE LIVELIHOOD PROJECT (SLP) (EMPLOYMENT FECILITATION TRACK) 1,000,000.00 1,000,000.00 260 CABAGAN 6,480,000.00 - - - 600,000.00 - 2,241,000.00 - - 2,624,000.00 - - - 555,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 6,480,000.00 6,480,000.00 PURCHASE OF 2 UNITS TRACTOR - PURCHASE OF COMBINED HARVESTER - MULTI-PURPOSE DRYING PAVEMENTS - MECHANICAL DRYERS - CONSTRUCTION OF PALAY AND CORN SHEDS (5 UNITS) - PROVISION OF POTABLE WATER SYSTEM 600,000.00 600,000.00 PURCHASE OF MEDICINES FOR SENIOR CITIZENS 500,000.00 500,000.00 HEALTH FACILITY ENHANCEMENT:PURCHASE OF HEMOANALYZER 560,000.00 560,000.00 RABIES ELIMINATION: CATEGORY II BITES, CATEGORY III BITES 1,181,000.00 1,181,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS WITH COMPLETE SET OF SOAP AND FLUORIDE TOOTHPASTE AT 30,000 PER DAY CARE CENTERS 624,000.00 624,000.00 CONSTRUCTION OF DAY CARE CENTERS 1,200,000.00 1,200,000.00 CONSTRUCTION OF EVACUATION CENTERS 800,000.00 800,000.00 ESTABLISHMENT OF COMMUNAL GARDEN PER BARANGAY 555,000.00 555,000.00 261 CABATUAN 500,000.00 - - 1,538,000.00 4,427,000.00 - 1,211,000.00 - - 4,112,000.00 712,000.00 - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & DEVELOPMENT 500,000.00 500,000.00 BASIC EDUCATION FACILITIES DEVELOPMENT REPAIR & REHABILITATION OF CLASSROOMS 1,538,000.00 1,538,000.00 VARIOUS PROJECTS 4,427,000.00 4,427,000.00 FLOOD CONTROL PROJECTS : CONSTRUCTION OF DRAINAGE CANALS - FLOOD CONTROL PROJECTS : FLOOD CONTROL - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS FLOOD CONTROL PROJECTS: FLOOD CONTROL (IRRIGATION LINE CANAL) - CONSTRUCTION OF PUBLIC MARKET - HEALTH FACILITIES ENHANCEMENT PROGRAM 611,000.00 611,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-BARANGAY HEALTH STATION 600,000.00 600,000.00 PROTECTIVE SERVICES INFRA.PROJECTS: CONSTRUCTION OF DCC 1,112,000.00 1,112,000.00 SUSTAINABLE LIVELIHOOD PROGRAM MICROENTERPRISE DEVELOPMENT TRACK 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM EMPLOYMENT FACILITATION TRACK 1,000,000.00 1,000,000.00 OTOP STORE (PASALUBONG CENTER) 712,000.00 712,000.00 262 CAUAYAN CITY 1,320,000.00 - - - 2,850,000.00 - 1,100,000.00 - - 4,630,000.00 2,600,000.00 - - - 12,500,000.00 DUCK RAISING 660,000.00 660,000.00 SWINE PRODUCTION 660,000.00 660,000.00 CONSTRUCTION OF DEEPWELL LEVEL 2 WATER SUPPLY SYSTEM (600HH) 2,850,000.00 2,850,000.00 HEALTH AWARENESS TRAINING PROGRAM 500,000.00 500,000.00 DIABETES AWARENESS PROGRAM, ORAL HEALTH 600,000.00 600,000.00 CONSTRUCTION OF TWO UNITS DAY CARE CENTER 1,000,000.00 1,000,000.00 LIVELIHOOD ASSISTANCE FOR PANTAWID GRANTEES 3,630,000.00 3,630,000.00 PICKLED LABONG/LABONG PASTRIES 600,000.00 600,000.00 TIGER GRASS PRODUCTION 500,000.00 500,000.00 POTTERY MAKING 500,000.00 500,000.00 BAMBOO PROCESSING AND BAMBOO CRAFT 1,000,000.00 1,000,000.00 263 CORDON 4,000,000.00 - 500,000.00 - 5,000,000.00 - - - - 1,800,000.00 - - 1,200,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,000,000.00 4,000,000.00 ORGANIC FERTILIZER PRODUCTION - MULTIPURPOSE DRYING PAVEMENT - LIVELIHOOD PROJECT: GOAT PRODUCTION - TRADING POST: ESTABLISMENT OF AGRICULTURAL COMMODITY TRADING CENTER - NGP REFORESTATION 500,000.00 500,000.00 SALINTUBIG (PROVISION OF POTABLE WATER SYSTEM) 3,000,000.00 3,000,000.00 PUBLIC MARKET BUILDING 2,000,000.00 2,000,000.00 DAY CARE CENTER 1,800,000.00 1,800,000.00 SKILLS & ENTREPRENEURIAL TRNG PACKAGE 1,200,000.00 1,200,000.00 264 DELFIN ALBANO 4,065,000.00 - - - - - 2,659,000.00 - - 4,276,000.00 1,500,000.00 - - - 12,500,000.00 FARM MECHANIZATION - PURCHASE OF 4-WHEEL TRACTOR WITH COMPLETE ACCESSORIES 2,250,000.00 2,250,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT 1,200,000.00 1,200,000.00 CONSTRUCTION OF SMALL FARM RESERVOIR 615,000.00 615,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAMS A. BASIC EQUIPMENT & INSTRUMENTS(UPB) B. STRENGTHENING MATERNAL AND INFANT CARE C. TB DOTS AND DIAGNOSTIC FACILITY ENHANCEMENT PROGRAM D. PRIMARY CARE SERVICES ENHANCEMENT E. SECONDARY HEALTH CARE REINFORCEMENT 2,659,000.00 2,659,000.00 CONSTRUCTION OF DAY CARE CENTER BUILDINGS 1,276,000.00 1,276,000.00 SUSTAINABLE LIVELIHOOD PROJECT 3,000,000.00 3,000,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAMS ON: A. CAPACITY BUILDING B. PRODUCT DEVELOPMENT & TECHNOLOGY PROMOTIONS C. MARKETING PROMOTION AND LINKAGES D. INVESTMENT PROMOTION AND FACILITIES E. MONITORING AND EVALUATION 1,500,000.00 1,500,000.00 265 DINAPIGUE 3,700,000.00 - - - 3,600,000.00 - - 1,200,000.00 1,500,000.00 2,500,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,700,000.00 3,700,000.00 INSTALLATION OF PAYAO - CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT - PURCHASE OF FREEZER VAN - PURCAHSE OF MOTORIZED BANCA - SALINTUBIG (CONSTRUCTION OF DEEPWELL LEVEL I) 500,000.00 500,000.00 CONSTRUCTION/REHABILITATIONOF WATERSYTEM - SPRING LEVEL 1 1,350,000.00 1,350,000.00 CONSTRUCTION OF SEA WALL 1,750,000.00 1,750,000.00 FOOD PROCESSING AND PRESERVATION 1,200,000.00 1,200,000.00 DEVELOPMENT OF ECO-TOURIST DESTINATION 1,500,000.00 1,500,000.00 CONSTRUCTION OF CLIMATE CHANGE RESILIENT EVACUATION CENTER 2,500,000.00 2,500,000.00 266 DIVILACAN 2,321,000.00 6,455,000.00 500,000.00 - 3,224,000.00 - - - - - - - - - 12,500,000.00 PALAYAN MONG TIGANG, DIDILIGIN KO PROJECT - CONSTRUCTION OF BICOBIAN COMMUNAL IRRIGATION SYSTEM 6,455,000.00 6,455,000.00 BASA MONG ANI, PATUTUYUIN KO PROJECT - ACQUISITION OF TWO(2) UNITS MECHANICAL DRYER 2,321,000.00 2,321,000.00 PALAYAN MONG TIGANG, DIDILIGIN KO PROJECT - CONSTRUCTION OF BICOBIAN COMMUNAL IRRIGATION SYSTEM: NURSERY ESTABLISHMENT AND WATERSHED REHABILITATION 500,000.00 500,000.00 KANLUNGAN NG MGA TAO SA PANAHON NG TRAHEDYA (KATAPAT) CONSTRUCTION OF TYPHOON RESISTANT EVACUATION CENTER 3,224,000.00 3,224,000.00 267 ECHAGUE 8,000,000.00 - - - 1,300,000.00 - 1,200,000.00 - - - 2,000,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 8,000,000.00 8,000,000.00 ESTABLISHMENT OF VERMI COMPOST PRODUCTION - PROCUREMENT OF MOUNTED DRILLING RIG/DRILLING MACHINE - CONSTRUCTION OF BAGSAKAN CENTER - AGRI-FISHERY TRAINING - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT OF UPLAND/AEROBIC RICE AS WELL AS IN RAINFED ECO-SYSTEM (TWO (2) UNITS BRAND NEWMINI- TRACTOR WITH RATED POWER OF 45-90 HP WITH COMPLETE ACCESSORIES - ESTABLISHMENT OF MULTI_PURPOSE DRYING PAVEMENT (MPDP) - CONSTRUCTION OF PUMP WELLS AND DUG WELLS 1,300,000.00 1,300,000.00 TRAINING FOR HEALTH PROVIDERS 1,200,000.00 1,200,000.00 CONSTRUCTION OF PASALUBONG CENTER 2,000,000.00 2,000,000.00 268 GAMU 2,600,000.00 - - 500,000.00 600,000.00 - 672,000.00 - 500,000.00 4,100,000.00 500,000.00 - - 3,028,000.00 12,500,000.00 CONSTRUCTION OF FISH NURSERY 1,000,000.00 1,000,000.00 CONSTRUCTION OF 16 UNITS STRUCTURE AND PURCHASE OF SHREDDER MACHINE FOR THE ORGANIC FERTILIZER PRODUCTION. 1,600,000.00 1,600,000.00 RENOVATION OF BURNED SCHOOL BUILDING 500,000.00 500,000.00 SALIN TUBIG 600,000.00 600,000.00 RNHEALS PROGRAM 672,000.00 672,000.00 TOURISM DEVELOPMENT 500,000.00 500,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS (PSIP) 1,700,000.00 1,700,000.00 SUSTAINABLE LIVELIHOOD PROJECT (SLP) 2,400,000.00 2,400,000.00 YAMAN PINOY 500,000.00 500,000.00 CORE LOCAL ROAD CONCRETING OF LENZON MUNICIPAL ROAD 3,028,000.00 3,028,000.00 269 ILAGAN CITY 2,400,000.00 - 2,600,000.00 - 5,550,000.00 - - 1,350,000.00 - 600,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,400,000.00 2,400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) AND OTHER AGRI- FISHERY BUSINESS INVESTMENT (SWINE PROJECT) - CONSTRUCTION OF MULTI-PURPOSE PAVEMENT DRYER - REHABILITATION OF DENUDED AREAS 2,600,000.00 2,600,000.00 CONSTRUCTION OF LEVEL I WATER SYSTEM 5,550,000.00 5,550,000.00 STARTER KIT 600,000.00 600,000.00 INTEGRATED LIVELIHOOD PROGRAM: MUSHROOM PRODUCTION AND SMOKED FISH PRODUCTION 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTER 600,000.00 600,000.00 270 JONES 4,940,000.00 - 1,080,000.00 - 4,200,000.00 - 1,280,000.00 - - 1,000,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,940,000.00 4,940,000.00 AGRO- PROCESSING FACILITIES & EXPANDED AGRI- BUSINESS ACTIVITIES - POST HARVEST FACILITIES - WAREHOUSE( FARM PRODUCE STORAGE ) - POST HARVEST FACILITIES - MPDP WITH PALAY / CORN SHED ( 4 UNITS ) - ORGANIC FERTILIZER PRODUCTION - NATIONAL GREENING PROGRAM 1,080,000.00 1,080,000.00 SALIN TUBIG - SAGANA AT LIGTAS NA TUBIG S LAHAT ( PROVISION OF PORTABLE WATER SUPPLY) 4,200,000.00 4,200,000.00 RABIES ELIMINATION 710,000.00 710,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (PRIMARY CARE BENEFITS ) 570,000.00 570,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICRO INTERPRISE DEVT. TRACK 1,000,000.00 1,000,000.00 271 LUNA 2,000,000.00 - - 1,000,000.00 - - 1,152,000.00 - - 2,000,000.00 6,348,000.00 - - - 12,500,000.00 MULTI PURPOSE DRYING PAVEMENTS 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 REPAIR/REHABILITATION OF SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,152,000.00 1,152,000.00 SUSTAINABLE LIVELIHOOD PROJECT MICRO ENTERPRISE DEVELOPMENT TRACK 2,000,000.00 2,000,000.00 YAMAN PINOY 5,348,000.00 5,348,000.00 OTOP EXPRESS STORE 1,000,000.00 1,000,000.00 272 MACONACON 5,500,000.00 - - - 5,000,000.00 - - - 2,000,000.00 - - - - - 12,500,000.00 COSTRUCTION OF APLAYA DIVERSION DAM 2,000,000.00 2,000,000.00 CONSTRUCTION OF AN AGRICULTURAL TRAMLINE 2,700,000.00 2,700,000.00 PROCUREMENT OF FOUR WHEEL TRACTOR 800,000.00 800,000.00 CONSTRUCTION OF DEEP WELL 1,000,000.00 1,000,000.00 CONSTRUCTION OF FLOOD CONTROL 1,500,000.00 1,500,000.00 PROCUREMENT OF RESCUE EQUIPMENTS 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 ECO-TOURISM DEVELOPMENT 2,000,000.00 2,000,000.00 273 MALLIG 2,115,000.00 - - 1,400,000.00 2,362,500.00 - 500,000.00 - - 4,500,000.00 622,500.00 - - - 11,500,000.00 MECHANICAL DRYER 1,515,000.00 1,515,000.00 SHREDDER 600,000.00 600,000.00 REPAIR/REHABILITATION OF CLASSROOMS 1,400,000.00 1,400,000.00 EVACUATION FACILITY (CONSTRUCTION OF MULTI-PURPOSE EVACUATION CENTER) 2,362,500.00 2,362,500.00 HEALTH FACILITY ENHANCEMENT PROGRAM (CONSTRUCTION OF BARANGAY HEALTH STATION) 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 1,400,000.00 1,400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 3,100,000.00 3,100,000.00 DEVELOPMENT OF MALLIG REGION AS "CHRISTMAS VILLAGE ENTERPRISE IN THE PROVINCE OF ISABELA 622,500.00 622,500.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) - 274 NAGUILIAN 5,110,000.00 - - 1,200,000.00 3,000,000.00 - 1,500,000.00 - - 1,690,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 5,110,000.00 5,110,000.00 FLAT BED DRYER - MULTI-PURPOSE DRYING PAVEMENT - CASSAVA GRANULATOR - CASSAVA STARCH SEPARATOR - BASIC EDUCATION FACILITIES-REPAIR/REHABILITATION OF CLASSROOMS 1,200,000.00 1,200,000.00 FLOOD CONTROL: CONSTRUCTION OF DRAINAGE CANAL 3,000,000.00 3,000,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS UPGRADING OF HEALTH FACILITIES IN TERMS OF BUILDING DESIGN AND EQUIPMENT COMPLEMENTATION TOWARDS ADAPTATION TO CLIMATE CHANGE, OR AS HOSPITALS SAFE FROM DISASTERS 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTERS 1,040,000.00 1,040,000.00 CONSTRUCTION OF GROUP HAND-WASHING FACILITY IN DAY CARE CENTERS 650,000.00 650,000.00 275 PALANAN - - - - 6,000,000.00 - - - - - - - - 5,000,000.00 11,000,000.00 EXPANSION OF LEVEL II WATER SUPPLY SYSTEM 2,500,000.00 2,500,000.00 CONSTRUCTION OF LEVEL 1 WATER SUPPLY SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 2,500,000.00 2,500,000.00 VARIOUS ROAD PROJECTS 5,000,000.00 5,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) - 276 QUEZON 1,800,000.00 - 1,100,000.00 2,593,974.00 2,846,026.00 - - - 1,210,000.00 2,100,000.00 850,000.00 - - - 12,500,000.00 CONSTRUCTION OF SMALL FARM RESERVOIR 1,200,000.00 1,200,000.00 ACQUISITION OF COLLECTING/DELIVERY VAN 600,000.00 600,000.00 REHABILITATION OF MANGA SWIP WATERSHED 500,000.00 500,000.00 TREE SEEDLING PRODUCTION 600,000.00 600,000.00 GULAYAN SA PAARALAN 170,000.00 170,000.00 REPAIR OF SCHOOL CLASSROOM 2,423,974.00 2,423,974.00 CONSTRUCTION OF OPEN PUBLIC MARKET 2,846,026.00 2,846,026.00 CONSTRUCTION OF QUEZON PASALUBONG CENTER CUM INFO CENTER/REST AREA 1,210,000.00 1,210,000.00 CONSTRUCTION OF DAYCARE CENTER 1,200,000.00 1,200,000.00 REPAIR/UPGRADING OF DAYCARE CENTER 900,000.00 900,000.00 ESTABLISHMENT OF RICE PROCESSING FACILITY 850,000.00 850,000.00 277 QUIRINO 2,146,000.00 - - 3,391,900.00 - - 2,777,900.00 - - 3,659,200.00 - - 525,000.00 - 12,500,000.00 CONSTRUTION OF MULTI PURPOSE DRYING PAVEMENT 800,000.00 800,000.00 ESTABLISHMENT OF SHALLOWTUBE WELLS (STW) 1,346,000.00 1,346,000.00 REPAIR/REHABILATION OF CLASSROOM 2,750,000.00 2,750,000.00 PROVISION OF SCHOOLS FURNITURE 641,900.00 641,900.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 576,000.00 576,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,700,000.00 1,700,000.00 INFECTOUS DISEASES CONTROL PROGRAM 501,900.00 501,900.00 REPAIR/UPGRADING OF DAY CARE CENTER 1,575,000.00 1,575,000.00 CAPACITY/CAPABILITY BUILDING 525,000.00 525,000.00 PROVISION OF ECCD PLAY ART/LEARNING MATERIALS AND HYGIENE KIT/MATERIALS IN DAY CARE CENTERS 735,000.00 735,000.00 SUSTAINABLE LIVELIHHOD PROGRAM, MICRO-ENTERPRISE DEVELOPMENT TRACK 824,200.00 824,200.00 PRACTICAL SKILLS DEVELOPMENT 525,000.00 525,000.00 278 RAMON 2,000,000.00 - - - - - 1,000,000.00 500,000.00 - 500,000.00 1,500,000.00 - - 7,000,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE 1,000,000.00 1,000,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT 1,000,000.00 1,000,000.00 MATERNAL, NEONATAL, CHILD AND NUTRITION (MNCHN) 500,000.00 500,000.00 RABIES ELIMINATION 500,000.00 500,000.00 DOLE INTEGRATED LIVLIHOOD PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF TOURISM INFORMATION CENTER & REST AREA (TOURISM PRODUCTS AND DESTINAYION DEVELOPMENT) 1,500,000.00 1,500,000.00 CONCRETING OF BARANGAY ROADS 7,000,000.00 7,000,000.00 279 REINA MERCEDES 500,000.00 - - - 5,140,000.00 - - - - 2,000,000.00 - - - 4,860,000.00 12,500,000.00 POST HARVEST FACILITIES & EQUIPMENT(MECHANICAL DRYER, MPDP) 500,000.00 500,000.00 CONSTRUCTION OF LEVEL 2 DEEPWELL 4,140,000.00 4,140,000.00 CONSTRUCTION OF CANAL/DRAINAGE 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTER 2,000,000.00 2,000,000.00 ROAD MAINTENANCE 1,160,000.00 1,160,000.00 CONCRETING OF ROADS 3,700,000.00 3,700,000.00 280 ROXAS - - - 1,500,000.00 - - 2,320,000.00 - - 3,580,000.00 5,100,000.00 - - - 12,500,000.00 REPAIR OF 10 CLASSROOMS 1,500,000.00 1,500,000.00 HEALTH FACILITIES 2,320,000.00 2,320,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR 33 DAY CARE CENTERS AND 5 SNP 561,000.00 561,000.00 VARIOUS CDD PROJECTS 1,644,000.00 1,644,000.00 REPAIR/UPGRADING OF 5 DAY CARE CENTERS - CONSTRUCTION OF SOTERO NUESA DAY CARE CENTER - CONSTRUCTION OF GROUP HAND WASHING FACILITY IN 33 DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND FLOURIDE GEL TOOTHPASTE) - CASH FOR WORK 1,375,000.00 1,375,000.00 MICRO-ENTERPRISE 3,100,000.00 3,100,000.00 CONSTRUCTION OF TOURISM INFORMATION CENTER/REST AREA AND PASALUBONG CENTER (CONSTRUCTION OF TOURISM REST AREA/PASALUBONG CENTER) 2,000,000.00 2,000,000.00 281 SAN AGUSTIN 3,850,000.00 - - - 7,550,000.00 - - - - 1,100,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT 2,250,000.00 2,250,000.00 POST HARVEST FACILITIES AND EQUIPMENT: PROVISION OF 2 UNITS MECHANICAL DRYERS/FLATBED 1,600,000.00 1,600,000.00 FLOOD CONTROL 7,550,000.00 7,550,000.00 PROTECTIVE SERVICES 1,100,000.00 1,100,000.00 282 SAN GUILLERMO 1,000,000.00 600,000.00 1,000,000.00 900,000.00 3,650,000.00 - 500,000.00 - - 1,300,000.00 1,550,000.00 - 500,000.00 1,500,000.00 12,500,000.00 ARC CONNECTIVITY & ECONOMIC SUPPORT SERVICES (ARCCESS) 500,000.00 500,000.00 PROVISION/CONSTRUCTION OF IRRIGATION FACILITIES 600,000.00 600,000.00 LIVESTOCK DISPERSAL PROGRAM - ORGANIC SWINE 500,000.00 500,000.00 REFORESTATION/AGRO-FORESTRY PROJECT (200 HA.) 1,000,000.00 1,000,000.00 REPAIR/REHABILITATION OF ACADEMIC BUILDING 900,000.00 900,000.00 CONSTRUCTION OF ADDITIONAL SOURCE OF WATER WITH COMPLETE EQUIPMENT AND FACILITIES INCLUDING WATER TREATMENT SYSTEMS. 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION/INSTALLATION OF DEEPWELL - LEVEL I WATER SYSTEMS. 650,000.00 650,000.00 REHABILITATION OF COLORADO BRIDGE 2,000,000.00 2,000,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 800,000.00 800,000.00 CONSTRUCTION/REHABILITATION OF DAY CARE CENTERS 500,000.00 500,000.00 SHARED SERVICE FACILITY - PROVISION OF COMMON SERVICE FACILITIES OR PRODUCTION CENTER/BUILDING 550,000.00 550,000.00 LIVEHOOD, SKILL TRAINING 1,000,000.00 1,000,000.00 CONCRETE PAVING OF BARANGAY ROAD 1,500,000.00 1,500,000.00 SKILLS TRAINING FOR THE OUT-OF-SCHOOL YOUTH ON VOCATIONAL/INDUSTRIAL COURSES 500,000.00 500,000.00 283 SAN ISIDRO 2,441,000.00 - 1,000,000.00 - - - - - - 6,000,000.00 - - - 3,059,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,441,000.00 2,441,000.00 ORGANIC FERTILIZER PRODUCTION - DEEP BEDDING, BACKYARD HOG RAISING ON ORGANIC FERTILIZER PRODUCTION - ORGANIC VEGETABLE AND TILAPIA PRODUCTION - NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 REPAIR/UPGRADING OF DAY CARE CENTERS, CONSTRUCTION OF GROUP HAND WASHING FACILITY WITH COMPLETE SET OF SOAP AND FLUORIDE GEL TOOTHPASTE 2,000,000.00 2,000,000.00 CONTINUOUS CAPACITY BUILDING FOR DAY CARE WORKERS AND PROVISION OF ECCD LEARNING MATERIALS FOR DAY CARE CENTERS 2,000,000.00 2,000,000.00 SKILLS TRAINING FOR BAMBOO CRAFT AND DUYAN MAKING 500,000.00 500,000.00 CAPITAL ASSISTANCE FOR PANTAWID PILIPINO PROGRAM BENEFICIARIES 1,500,000.00 1,500,000.00 CONCRETING OF CAMARAG TO PATANAD ROAD 3,059,000.00 3,059,000.00 284 SAN MANUEL 4,604,000.00 - 1,000,000.00 1,884,000.00 - - 1,087,000.00 1,315,000.00 - 1,240,000.00 - - 1,370,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 4,604,000.00 4,604,000.00 SOCIAL INFRASTRUCTURE & LOCAL CAPABILITY BUILDING (SILCAB)-INSTITUTIONAL DEVELOPMENT INTERVENTIONS - ARC CONNECTIVITY & ECONOMIC SUPPORT SERVIVES (ARCCESS) - PRODUCTION OF ORGANIC FERTILIZER THROUGH VERMI CULTURE - MULTI - PURPOSE DRYING PAVEMENT (MPDP) - SWIP - REHAB OF CHECK GATE, SPILLWAY, AND IRRIGATION CANAL - NATIONAL GREENING PROGRAM 500,000.00 500,000.00 ECO SAVERS 500,000.00 500,000.00 REHABILITATION OF SCHOOL BUILDING 1,384,000.00 1,384,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 BUDGET EXPANSION FOR TRAININGS AND SEMINARS: A)MNCHN, B)CHT, C)RABIES ELIMINATION, D) LEPROSY, E) TB CONTROL, F) STI/HIV/AIDS PREVENTION, G) DENGUE CONTROL, H) HEM, I)BASIC TRAINING ON MEDICO-LEGAL EXAMINATION 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 587,000.00 587,000.00 EMPLOYMENT GENERATION AND FACILITATION 1,315,000.00 1,315,000.00 CONSTRUCTION OF DAY CARE SCHOOL BUILDING 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICRO ENTERPRISE DEVELOPMENT TRACK) 740,000.00 740,000.00 PRACTICAL SKILLS AND DEVELOPMENT TRAINING (CHILDREN OF 4P'S BENEFICIARIES & OUT OF SCHOOL YOUTH) 1,370,000.00 1,370,000.00 285 SAN MARIANO 3,450,000.00 - 1,000,000.00 - 3,400,000.00 - - 600,000.00 - 2,500,000.00 750,000.00 - 800,000.00 - 12,500,000.00 ESTABLISHMENT OF BAGSAKAN CENTER 1,000,000.00 1,000,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT 1,650,000.00 1,650,000.00 APICULTURE PRODUCTION 800,000.00 800,000.00 AFFORESTATION AND REFORESTATION OF SMALL WATER IMPOUNDING PROJECT WATERSHED AND CROCODILE SANCTUARY PROTECTED AREA 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II (SPRING DEVELOPMENT) WATER SYSTEM 2,000,000.00 2,000,000.00 RESCUE 10-66 CAPABILITY AND EQUIPMENT SUPPORT PROGRAM 1,400,000.00 1,400,000.00 LIVELIHOOD ASSISTANCE PROGRAM 600,000.00 600,000.00 CONSTRUCTION OF EVACUATION CENTER 1,500,000.00 1,500,000.00 CONSTRUCTION OF RELIEF OPERATION CENTER 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM: WOODWORKS & CASSAVA FOOD PRODUCTION 750,000.00 750,000.00 SKILLS TRAINING PROGRAM 800,000.00 800,000.00 286 SAN MATEO 1,100,000.00 - - - - - 2,400,000.00 - - 7,000,000.00 2,000,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,100,000.00 1,100,000.00 ORGANIC FERTILIZER PRODUCTION - IRRIGATION PROJECTS - PURCHASE OF MEDICAL EQUIPMENTS AND APPARATUS 2,400,000.00 2,400,000.00 UPGRADING OF DAY CARE CENTERS (DCC) 1,000,000.00 1,000,000.00 SAN MATEO WOMEN CRISIS CENTER 500,000.00 500,000.00 SHELTERED WORKSHOP FOR OLDER PERSONS AND PERSON WITH DISABILTIES 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 5,000,000.00 5,000,000.00 AGRO-PROCESSING FACILITIES 2,000,000.00 2,000,000.00 287 SAN PABLO 1,266,600.00 500,000.00 - - 3,591,790.00 - - - 2,150,000.00 3,105,610.00 516,000.00 - - 1,370,000.00 12,500,000.00 PROVISION OF MULTI-PURPOSE TRESHER-SHELLER(MPTS) 766,600.00 766,600.00 REHABILITATION OF COMMUNAL IRRIGATION SYSTEM 500,000.00 500,000.00 PROVISION OF OPEN SOURCE PUMP WITH COMPLETE ACCESSORIES 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG ) - DEEP WELL/LEVEL II 3,591,790.00 3,591,790.00 SAN PABLO ECOTOURISM & ENVIRONMENT ENHANCEMENT PROJECT 2,150,000.00 2,150,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF 5 UNITS DAY CARE CENTER WITH COMPLETE FACILITIES @ 400,000 EACH 1,720,000.00 1,720,000.00 REPAIR/INSTALLATION OF HAND WASHING FACILITY IN DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND FLUORIDE GEL TOOTHPASTE ) FOR 24 BRGYS. 785,610.00 785,610.00 SUSTAINABLE LIVELIHOOD PROGRAM 600,000.00 600,000.00 SKILLS TRAINING ON FOOD PROCESSING 516,000.00 516,000.00 CONCRETING OF CORE LOCAL ROAD GOING TO CONTROLLED DUMPSITE 1,370,000.00 1,370,000.00 288 SANTA MARIA 500,000.00 - - - 6,155,440.00 - 4,776,800.00 - - - - - - 1,067,760.00 12,500,000.00 CONSTRUCTION OF FOUR (4) UNITS MULTI-PURPOSE DRYING PAVEMENT 500,000.00 500,000.00 UPGRADING OF EXISTING LEVEL III WATER SYSTEM 3,660,000.00 3,660,000.00 CONSTRUCTION OF PUBLIC MARKET PHASE III 2,495,440.00 2,495,440.00 UPGRADING OF EUMIMH SERVICE FACILITIES 4,776,800.00 4,776,800.00 REHABILITATION OF LOCAL ACCESS ROAD 1,067,760.00 1,067,760.00 289 SANTIAGO CITY 2,300,000.00 - - - - - 600,000.00 3,320,000.00 - 4,480,000.00 1,800,000.00 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,300,000.00 2,300,000.00 PHILIPPINE MALLARD DUCK RAISING PROJECT - ORGANIC FERTILIZER PRODUCTION - LIVELIHOOD ENHANCEMENT FOR AGRICULTURAL WORKERS AND DISADVANTAGE SECTOR (LEADS PROJECT) - BEST CARE SERVICES 600,000.00 600,000.00 INTEGRATED LIVELIHOOD PROGRAM 2,820,000.00 2,820,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR INDIGENOUS PEOPLE 500,000.00 500,000.00 SHELTERED WORKSHOP FOR OLDER PERSONS AND PERSONS WITH DISABILITIES 840,000.00 840,000.00 CORE SHELTER PROJECT 1,240,000.00 1,240,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR NEIGHBORHOOD ASSOCIATIONS IF IHOME-HABITAT AND DSWD CSAP: MEAT PROCESSING AND BREADMAKING 600,000.00 600,000.00 UPSCALING AND RECYCLING (PRODUCTION OF TABLES AND CHAIRS OUT OF PLASTIC AND STYROPORE WASTES) 1,800,000.00 1,800,000.00 UPSCALING AND RECYCLING PROJECT- BAGS, PENCIL CASE, FLOWER VASE, PAPER AND MATS PRODUCTION 1,200,000.00 1,200,000.00 ESTABLISHMENT OF RICE RETAILING STORE 600,000.00 600,000.00 290 SANTO TOMAS 6,000,000.00 - - 800,000.00 - - 1,500,000.00 800,000.00 - 3,400,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 6,000,000.00 6,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE "FAME" FARMER'S ASSISTANCE THROUGH MECHANICAL EQUIPMENT - PROVISION OF AGRI-INPUTS "P-FAST" PESTICIDES, FERTILIZERS, AND SEED TRANSFER - INSTALLATION OF SUBMERSIBLE PUMPS TO BENEFIT MARGINALIZED FARMERS ("AYUDA") - REHABILITATION OF CLASSROOM "TULONG DUNONG" 800,000.00 800,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM "TAHANANG PANGKALUSUGAN" 1,000,000.00 1,000,000.00 INFECTIOUS DISEASES PREVENTION : A) RABIES ELIMINATION B) TB CONTROL C) HIV/STI PREVENTION D) DENGUE CONTROL "RID" REDUCTION OF INFECTIOUS DISEASES" 500,000.00 500,000.00 INTEGRATED LIVELIHOOD PROGAM "LIFT O"LIVELIHOOD INVESTMENT FOR TRICYCLE DRIVERS AND OPERATORS 800,000.00 800,000.00 CONSTRUCTION OF DAY CARE CENTER ("CAP") 1,500,000.00 1,500,000.00 ASSISTIVE DEVICES "AID" ASSISTANCE TO INDIVIDUALS WITH DISABILITIES 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR CSO BENEFICIARIES. "BRAVO" BARANGAY REGREENING FOR ABUNDANT VEGETABLE ON - HAND 1,200,000.00 1,200,000.00 291 TUMAUINI - - - 3,200,000.00 3,000,000.00 - - 1,005,000.00 1,000,000.00 3,295,000.00 1,000,000.00 - - - 12,500,000.00 REHABILITATION OF CLASSROOMS 2,297,000.00 2,297,000.00 PROVISION OF SCHOOL FURNITURE 903,000.00 903,000.00 REHABILITATION OF LEVEL III WATER SYSTEM 3,000,000.00 3,000,000.00 LIVELIHOOD ENHANCEMENT THRU NEGO-KART PROJECT 1,005,000.00 1,005,000.00 CONSTRUCTION/OPERATION OF A PASALUBONG CENTER 1,000,000.00 1,000,000.00 VARIOUS CDD PROJECTS 1,795,000.00 1,795,000.00 CONSTRUCTION OF DAY CARE CENTER - REHABILITATION OF DAY CARE CENTER - SUSTAINABLE LIVELIHOOD PROGRAM THROUGH SELF- EMPLOYMENT ASSISTANCE-KAUNLARAN (SEA-K) PROJECT 1,500,000.00 1,500,000.00 CONSTRUCTION/OPERATION OF A PASALUBONG CENTER (SEED CAPITAL) 1,000,000.00 1,000,000.00 NUEVA VIZCAYA 31,470,000.00 - 7,029,750.00 11,815,000.00 48,042,850.00 - 13,183,200.00 4,314,000.00 4,600,000.00 12,450,000.00 9,700,000.00 3,000,000.00 1,000,000.00 40,395,200.00 187,000,000.00 292 ALFONSO CASTANEDA 1,500,000.00 - 1,100,000.00 110,000.00 3,600,000.00 - 3,076,000.00 1,014,000.00 1,100,000.00 1,000,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PRODUCTION - POST-HARVEST FACILITIES & EQUIPMENT - NATIONAL GREENING PROGRAM 1,100,000.00 1,100,000.00 GULAYAN SA PAARALAN 110,000.00 110,000.00 SAGANA AT LIGTAS NA TUBIG 3,600,000.00 3,600,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,500,000.00 2,500,000.00 RNHEALS 576,000.00 576,000.00 INTEGRATED LIVELIHOOD PROGRAMS 1,014,000.00 1,014,000.00 IMPROVEMENT OF GALINTUJA FALLS & DEVELOPMENT OF LAKESIDE WATER SPORT & RECREATIONAL PARK 1,100,000.00 1,100,000.00 SUSTAINABLE LIVELIHOOD 1,000,000.00 1,000,000.00 293 AMBAGUIO 2,500,000.00 - - - 1,700,000.00 - - - - 1,500,000.00 - - - 6,800,000.00 12,500,000.00 SILCAB-INSTITUTIONAL DEVELOPMENT INTERVENTION 500,000.00 500,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 500,000.00 500,000.00 TRAMLINES 1,500,000.00 1,500,000.00 SALINTUBIG-PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 SALINTUBIG-PROVISION OF POTABLE WATER SUPPLY 700,000.00 700,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 500,000.00 500,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 500,000.00 500,000.00 PROTECTIVE SERVICES AND CAPACITY BUILDING 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 6,800,000.00 6,800,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - 294 ARITAO - - - 770,000.00 8,630,000.00 - - 500,000.00 - - - - 1,000,000.00 1,600,000.00 12,500,000.00 REHABILITATION OF TWO (2) UNITS TLE ROOM AND ACQUISITION OF FURNITURES 500,000.00 500,000.00 GULAYAN SA PAARALAN 270,000.00 270,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - REHABILITATION & EXPANSION OF LEVEL II WATER SYSTEM 1,130,000.00 1,130,000.00 LOCAL ECONOMIC DEVELOPMENT - DEVELOPMENT OF ARITAO GROWTH CENTER (PUBLIC MARKET) 7,500,000.00 7,500,000.00 FOOD PROCESSING MICRO-BUSINESS SAVING AND LENDING MOBILIZATION (MSLM) CENTER 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION 1,600,000.00 1,600,000.00 ACQUISITION OF TECH VOC EQUIPMENT FOR ALTERNATIVE LEARNING SYSTEM (ALS) LEARNERS (SKILLS TRAINING) 1,000,000.00 1,000,000.00 295 BAGABAG 3,000,000.00 - 1,610,000.00 - 3,000,000.00 - 1,268,000.00 - - 1,400,000.00 1,000,000.00 500,000.00 - 1,722,000.00 13,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVELOPMENT 3,000,000.00 3,000,000.00 NATIONAL GREENING PROGRAM (NGP) 610,000.00 610,000.00 SAGANA AT LIGTASNATUBIGPARASALAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 RN HEALS PLACEMENT PROGRAM 768,000.00 768,000.00 PROVISION OF SUSTAINABLE LIVELIHOOD PROGRAM (SLP)- MICROENTERPRISE DEVELOPMENT TRACK 900,000.00 900,000.00 PROTECTIVE SERVICESINFRASTRUCTURE PROGRAM 500,000.00 500,000.00 FACILITATION OF THE LGUS PREPARATION OF THE FOLLOWING: 1. FORMULATION OF MUNICIPAL/CITY ECONOMIC DEVELOPMENT PLAN 2. FORMULATION OF MUNICIPAL/CITY INVESTMENT PLAN 3. FORMULATION OF MUNICIPAL/CITY INVESTMENT INCENTIVES CODE 4. STREAMLINING BUSINESS PERMITS AND LICENSING SYSTEM 5. COMPREHENSIVE DEVELOPMENT PLAN 6. PRODUCT DEVELOPMENT ACTION PLAN 1,000,000.00 1,000,000.00 CONCRETING OF ELIZAGA ROAD 1,722,000.00 1,722,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 500,000.00 500,000.00 296 BAMBANG - - 1,000,000.00 3,600,000.00 2,714,000.00 - 1,686,000.00 - - 1,000,000.00 2,500,000.00 - - - 12,500,000.00 NATIONAL GREENING PROGRAM (NGP) 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES:-REPAIR/REHABILITATION OF CLASSROOMS 3,600,000.00 3,600,000.00 SALINTUBIG (SAGANA AT LIGTAS NA TUBIG SA LAHAT - PROVISION OF POTABLE WATER SUPPLY) 1,714,000.00 1,714,000.00 VARIOUS PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF CANALS/DRAINAGE WITHIN THE POBLACION - CONSTRUCTION OF FLOOD CONTROL (@ SANTA TERESITA CRUZ RIVER NEAR THE SCHOOL) - COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 510,000.00 510,000.00 RNHEALS 576,000.00 576,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 600,000.00 600,000.00 TRACK SUSTAINABLE LIVELIHOOD PROGRAM(SLP) EMPLOYMENT FACILITATION 1,000,000.00 1,000,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 1,500,000.00 1,500,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) 1,000,000.00 1,000,000.00 297 BAYOMBONG 4,240,000.00 - - 260,000.00 - - - - 1,000,000.00 1,500,000.00 2,000,000.00 1,500,000.00 - 2,000,000.00 12,500,000.00 POST HARVEST FACILITIES & EQUIPMENT (MULTI-PURPOSE DRYING PAVEMENT WITH PALAY SHED) 2,600,000.00 2,600,000.00 FARM IMPLEMENTS/TOOLS ( FOR UPLAND FARMERS) 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION (BIO FERTILIZER, PRODUCTION- VERMICOMPOSTING) 640,000.00 640,000.00 GULAYAN SA PAARALAN 260,000.00 260,000.00 ESTABLISHMENT OF SOUVENIR SHOP/PASALUBONG CENTER 1,000,000.00 1,000,000.00 REPAIR/UPGRADING OF DAY CARE CENTERS AND CONSTRUCTIONS OF GROUP HAND WASHING FACILITY WITH COMPLETE SET OF SOAP AND FLOURIDE GEL TOOTHPASTE 1,500,000.00 1,500,000.00 SHARED SERVICE FACILITY 2,000,000.00 2,000,000.00 CORE LOCAL ROADS - REHABILITATION /CONSTRUCTION /MAINTENANCE 2,000,000.00 2,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,500,000.00 1,500,000.00 298 DIADI 3,500,000.00 - - 200,000.00 3,000,000.00 - 1,000,000.00 800,000.00 - 1,600,000.00 - - - 2,400,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,500,000.00 3,500,000.00 IRRIGATION PROJECTS / CONSTRUCTION OF SSIP AT BALETE- DURUOAG - INFASTRUCTURE SUPPORT TO AGRICULTURE - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE AGRI-BASED LIVELIHOOD PROJECT - GULAYAN SA PAARALAN 200,000.00 200,000.00 NEWDIADI PUBLIC MARKET 3,000,000.00 3,000,000.00 HEALTH EMERGENCY MANAGEMENT SYSTEM (HEMS) 500,000.00 500,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM(RHMPP) 500,000.00 500,000.00 TULONG PANGKABUHAYAN PARA SA MGA PWDS 800,000.00 800,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM / CHARCOAL BRIQUETTE PRODUCTION 600,000.00 600,000.00 CORE LOCAL ROAD REHABILITATION 2,400,000.00 2,400,000.00 299 DUPAX DEL NORTE 2,330,000.00 - - 1,500,000.00 3,881,600.00 - 538,400.00 - 2,000,000.00 - - - - 2,250,000.00 12,500,000.00 IRRIGATION PROJECTS 1,080,000.00 1,080,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 950,000.00 950,000.00 TRADING POST 300,000.00 300,000.00 REPAIR OF CLASSROOMS 1,500,000.00 1,500,000.00 SAGANA AT LIGTAS NA TUBIG (SALINTUBIG) -PROVISION OF POTABLE WATER SUPPLY 881,600.00 881,600.00 FLOOD CONTROL 2,000,000.00 2,000,000.00 EVACUATION FACILITY 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 538,400.00 538,400.00 DEVELOPMENT/IMPROVEMENT OF NARURON FALLS 2,000,000.00 2,000,000.00 CORE LOCAL ROADS CONSTRUCTION/ MAINTENANCE/ REHABILITATION 2,250,000.00 2,250,000.00 300 DUPAX DEL SUR 700,000.00 - 700,000.00 2,360,000.00 4,540,000.00 - 1,000,000.00 - - 2,500,000.00 700,000.00 - - - 12,500,000.00 ORGANIC FERTILIZER PROGRAM 700,000.00 700,000.00 NATIONAL GREENING PROGRAM 700,000.00 700,000.00 BASIC EDUCATION FACILITIES - REPAIR/REHABILITATION OF CLASSROOMS 1,500,000.00 1,500,000.00 BASIC EDUCATION FACILITIES - PROVISION OF SCHOOL FURNITURES 650,000.00 650,000.00 GULAYAN SA PAARALAN 210,000.00 210,000.00 VARIOUS PROJECTS 4,540,000.00 4,540,000.00 SALINTUBIG (CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM PHASE L) - SALINTUBIG (REHABILITATION/EXPANSION/UPGRADING OF LEVEL LLL WATER SUPPLY SYSTEM (WITH PROJECT TRAINING AND CAPACITY BUILDING) - HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - CAPABILITY BUILDING PROJECTS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 YAMAN PINOY INTEGRATED LIVELIHOOD 700,000.00 700,000.00 301 KASIBU 2,000,000.00 - 2,000,000.00 1,025,000.00 3,382,000.00 - 538,400.00 - - 800,000.00 - - - 2,754,600.00 12,500,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 500,000.00 500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITY 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM (NGP) 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES:REPAIR/REHABILITATION OF CLASSROOMS; PROVISION OF SCHOOL FURNITURES 525,000.00 525,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ ABOT-ALAM PROGRAM 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) 3,382,000.00 3,382,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 538,400.00 538,400.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 800,000.00 800,000.00 CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION 2,754,600.00 2,754,600.00 302 KAYAPA 2,700,000.00 - - 480,000.00 1,000,000.00 - 3,538,400.00 - - 500,000.00 1,500,000.00 - - 2,781,600.00 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICROENTERPRISE DEVELOPMENT TRACK (HOG RAISING) 700,000.00 700,000.00 YAMAN PINOY-HOG RAISING 600,000.00 600,000.00 YAMAN PINOY-CATTLE RAISING 900,000.00 900,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 GULAYAN SA PAARALAN 480,000.00 480,000.00 SALINTUBIG (PROVISION OF POTABLE WATER SYSTEM) 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (MATERNITY AND NEWBORN CARE) 538,400.00 538,400.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (UPGRADING OF HEALTH FACILITIES) 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (UPGRADING OF HEALTH FACILITIES) 1,000,000.00 1,000,000.00 MATERNAL, NEONATAL CHILD HEALTH AND NUTRITION (TRAINING ON BEMONC) 500,000.00 500,000.00 TRAINING ON HEALTH EMERGENCY AND MANAGEMENT 500,000.00 500,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT(CONSTRUCTION OF GROUP HANDWASHING FACILITY IN THE DAYCARE CENTERS WITH COMPLETE SET OF SOAP AND FLOURIDE GEL TOOTHPASTE) 500,000.00 500,000.00 YAMAN PINOY-TRAINING ON TIGER GRASS PRODUCTION AND SOFT BROOM MAKING 1,000,000.00 1,000,000.00 YAMAN PINOY-SHARED SERVICE FACILITY (CHARCOAL BRIQUETTING) 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION (CONCRETE ROAD-TIRE PATH) 2,781,600.00 2,781,600.00 303 QUEZON 2,000,000.00 - 1,045,000.00 680,000.00 3,500,000.00 - 538,000.00 - - 650,000.00 1,000,000.00 - - 3,087,000.00 12,500,000.00 SUSTAINABLE AGRI-BUSINESS AND RURAL ENTERPRISE DEVELOPMENT-ARC-CONNECTIVITY AND ECONOMIC SERVICES (ARCCESS) 500,000.00 500,000.00 POST HARVEST FACILITIES-MECHANICAL DRYER 1,500,000.00 1,500,000.00 NATIONAL GREENING PROGRAM (NGP)-REFORESTATION-SITE PLANNING, SEEDLING PRODUCTION, SITE DEVELOPMENT 1,045,000.00 1,045,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS BASIC EDUCATION FACILITIES-REPAIR /REHAB OF CLASSROOMS 500,000.00 500,000.00 GULAYAN SA PAARALAN 180,000.00 180,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT(SALINTUBIG)-PROVISION OF POTABLE WATER SUPPLY-IMPROVEMENT OF POTABLE WATER SUPPLY LEVEL III 2,000,000.00 2,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT(SALINTUBIG)-PROVISION OF IMPROVEMENT OF POTABLE WATER SUPPLY-CONSTRUCTION OF POTABLE WATER SUPPLY LEVEL I 1,500,000.00 1,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-UPGRADING OF HEALTH FACILITIES 538,000.00 538,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS-CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS 650,000.00 650,000.00 YAMANG PINOY-LIVELIHOOD PROGRAM 500,000.00 500,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 CORE ROAD REHABILITATION 3,087,000.00 3,087,000.00 304 SANTA FE 500,000.00 - - - 1,500,000.00 - - - 500,000.00 - 1,000,000.00 - - 8,500,000.00 12,000,000.00 COLD STORAGE FACILITIES/VANS 500,000.00 500,000.00 SALINTUBIG 1,000,000.00 1,000,000.00 FLOOD CONTROL PROGRAM 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 500,000.00 500,000.00 ESTABLISHMENT OF MUNICIPAL OTOP STORE EXPRESS 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONDITION/MAINTENANCE/ REHABILITATION 8,500,000.00 8,500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) - 305 SOLANO 2,500,000.00 - 574,750.00 830,000.00 2,595,250.00 - - 2,000,000.00 - - - - - 4,000,000.00 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (LIVESTOCK) 2,000,000.00 2,000,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 NATIONAL GREENING PROGRAM (NGP) 574,750.00 574,750.00 GULAYAN SA PAARALAN 230,000.00 230,000.00 BASIC EDUCATION FACILITIES(REPAIR/REHAB OF CLASSROOMS) 600,000.00 600,000.00 FLOOD CONTROL (CONCRETE LINE CANAL MARAGGAY CREEK) 1,595,250.00 1,595,250.00 FLOOD CONTROL (CONCRETE LINE CANAL BACARRA CREEK) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (FOOD PROCESING) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (HANDICRAFT MAKING) 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM:TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION (COMMUNAL-BAGUINGEY ROAD) 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION (BANGAAN-KIMMATIGID RD.) 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION (MAGARANG-CURIFANG RD.) 1,000,000.00 1,000,000.00 FLOOD CONTROL (DRAINAGE, BINTAWAN ROAD) 1,000,000.00 1,000,000.00 306 VILLAVERDE 4,000,000.00 - - - 5,000,000.00 - - - - - - 1,000,000.00 - 2,500,000.00 12,500,000.00 TRADING POST 4,000,000.00 4,000,000.00 FLOOD CONTROL 5,000,000.00 5,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 2,500,000.00 2,500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,000,000.00 1,000,000.00 QUIRINO 13,631,000.00 1,500,000.00 4,384,000.00 6,965,000.00 9,550,000.00 500,000.00 10,991,500.00 7,040,000.00 1,452,500.00 15,926,000.00 1,000,000.00 - - 2,000,000.00 74,940,000.00 307 AGLIPAY - - 1,980,000.00 930,000.00 3,750,000.00 - 2,840,000.00 1,000,000.00 - 2,000,000.00 - - - - 12,500,000.00 REFORESTATION, PLANTATION AND WATERSHED PROTECTION AND ESTABLISHMENT OF MUNICIPAL NURSERY 1,980,000.00 1,980,000.00 GULAYAN SA PAARALAN 270,000.00 270,000.00 REPAIR OF CLASSROOMS IN TEN(10) SCHOOLS OF AGLIPAY DISTRICT 660,000.00 660,000.00 CONSTRUCTION OF WATER RESERVOIR 2,000,000.00 2,000,000.00 CONSTRUCTION/REHABILITATION OF DEEP WELLS & SHALLOW WELLS 1,750,000.00 1,750,000.00 CHT MOBILIZATION 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (PROVISION OF EQUIPMENTS TO MAN RHU & 25 BHS) 800,000.00 800,000.00 RN HEALS 520,000.00 520,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 520,000.00 520,000.00 LIVELIHOOD ASSISTANCE FOR THE ASSOCIATIONS & SKILLED WORKERS IN THE MUNICIPALITY 1,000,000.00 1,000,000.00 CAPITAL ASSISTANCE & CASH FOR WORK TO INDIGENT INDIVIDUALS & FAMILIES 2,000,000.00 2,000,000.00 308 CABARROGUIS 3,000,000.00 500,000.00 - 1,500,000.00 2,900,000.00 - 2,000,000.00 1,000,000.00 - 1,600,000.00 - - - - 12,500,000.00 PROMOTION OF ORGANIC FARMING 500,000.00 500,000.00 STRENGTHENING ARC COOPERATIVE 500,000.00 500,000.00 PROVISION OF ANIMAL DISPERSAL 500,000.00 500,000.00 FARM MECHANIZATION 1,500,000.00 1,500,000.00 EXTENSION OF IRRIGATION SYSTEM 500,000.00 500,000.00 REPAIR OF CLASSROOM BUILDINGS (REPAIR AND IMPROVEMENT OF SCHOOL CLASSROOMS OF 8 ELEMENTARY SCHOOL) 500,000.00 500,000.00 REPAIR OF CLASSROOM BUILDINGS (REPAIR AND AND IMPROVEMENT OF TECHNICAL AND VOCATIONAL SCHOOL 500,000.00 500,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ ABOT-ALAM PROGRAMS FOR CHILDREN WITH SPECIAL NEEDS AND BPOSA AND ALS BENEFICIARIES 500,000.00 500,000.00 SALINTUBIG - PROVISION OF POTABLE WATER SYSTEM 2,900,000.00 2,900,000.00 CHT MOBILIZATION 500,000.00 500,000.00 CAPABILITY ENHANCEMENT BEMONC 500,000.00 500,000.00 MALARIA, RABIES, TB AND DENGUE CONTROL 500,000.00 500,000.00 CAPABILITY ENHANCEMENT ON PRIMARY HEALTH CARE 500,000.00 500,000.00 ESTABLISHMENT OF WELDING/VULCANIZING SHOPS/ MACHINE SHOPS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONDUCT OF LIVELIHOOD TRAINING FOR RIC THAT INCLUDE SEED CAPITAL 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 600,000.00 600,000.00 PROTECTIVE SERVICES CAPABILITY ENHANCEMENT 500,000.00 500,000.00 PROVISION OF EMERGENCY SHELTER 500,000.00 500,000.00 309 DIFFUN 1,200,000.00 - - 1,450,000.00 - 500,000.00 2,151,500.00 - 948,500.00 4,250,000.00 - - - 2,000,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,200,000.00 1,200,000.00 MULTI PURPOSE DRYING PAVEMENT (MPDP) - COLLAPSIBLE DRYERS - ORGANIC FERTILIZER PROD'N - BASIC EDUCATION FACILITIES:-REPAIR / REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 GULAYAN SA PAARALAN 450,000.00 450,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ MAKE ALL YOUNG OUTSTANDING READERS AND SPEAKERS (MAYORS) PROGRAM/PROVISION FOR ALTERNATIVE DELIVERY MODE 500,000.00 500,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM (HEP) 500,000.00 500,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 558,000.00 558,000.00 DENGUE CONTROL 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT 558,000.00 558,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) >TRAINING OF HEALTH PROVIDERS ON BASIC EMERGENCY OBSTETRIC AND NEWBORN CARE (BEMONC); > BASIC LIFE SUPPORT TRAINING FOR RHU STAFF; INTRA-PARTUM CARE TRAINING FOR MIDWIVES 535,500.00 535,500.00 LOCAL TOURISM DEVELOPMENT PROJECTS 948,500.00 948,500.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS - CONSTRUCTION OF EVACUATION CENTERS(MULTI-PURPOSE) 1,000,000.00 1,000,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DCCS AND SUPERVISED NEIGHBORHOOD PLAYGROUPS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - EMPLOYMENT FACILITATION TRACK 2,250,000.00 2,250,000.00 SUSTAINABLE LIVELIHOOD 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 2,000,000.00 2,000,000.00 310 MADDELA 2,300,000.00 1,000,000.00 - - - - 2,600,000.00 1,100,000.00 - 5,500,000.00 - - - - 12,500,000.00 IMPROVEMENT OF IRRIGATION CANAL 1,000,000.00 1,000,000.00 POST HARVEST FACILITIES 800,000.00 800,000.00 GULAYAN SA BARANGAY 500,000.00 500,000.00 FARM IMPLEMENTS/TOOLS 1,000,000.00 1,000,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 700,000.00 700,000.00 DENGUE CONTROL PROGRAM 600,000.00 600,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM/RN HEALS PROGRAM 1,300,000.00 1,300,000.00 LIVELIHOOD ASSISTANCE PROJECT 1,100,000.00 1,100,000.00 VARIOUS CDD PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION/REPAIR OF DAYCARE CENTER - CORE SHELTER ASSISTANCE PROJECT - SUSTAINABLE LIVELIHOOD 4P'S, FSC, CSAP BENIFICIARIES AND PWD 1,500,000.00 1,500,000.00 311 NAGTIPUNAN 3,391,000.00 - 1,404,000.00 945,000.00 900,000.00 - 900,000.00 2,440,000.00 504,000.00 2,016,000.00 - - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,391,000.00 3,391,000.00 CONSTRUCTION OF TRAMLINES - CONSTRUCTION OF TRADING POST - PROCUREMENT OF FARM INPUTS AND TOOLS(VEGETABLE PRODUCTION) - ORGANIC FERTILIZER PRODUCTION MARKETING & ADVOCACY - POST HARVEST FACILITIES AND EQUIPMENTS - REHABILITATION OF MUNICIPAL NURSERY AND GREEN HOUSE WITH ANTE ROOM - NATIONAL GREENING PROGRAM 504,000.00 504,000.00 ANCESTRAL DOMAIN SUPPORT FUND(AGRO- FORESTRY) 900,000.00 900,000.00 GULAYAN SA PAARALAN 270,000.00 270,000.00 BASIC EDUCATION FACILITIES REPAIR OF CLASSROOMS 675,000.00 675,000.00 REHABILITATION/EXPANSION OF POTABLE WATER SUPPLY 900,000.00 900,000.00 VARIOUS HEALTH EMERGENCY AND RESCUE MANAGEMENT, GADGETS & EQUIPMENTS 900,000.00 900,000.00 SPECIAL PROGRAM FOR THE EMPLOYMENT OF STUDENTS (SPES) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM & MICRO- ENTERPRISE DEVELOPMENT PROJECT 1,440,000.00 1,440,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 500,000.00 500,000.00 IMPROVEMENT OF HOSTEL/DORM HOMESTAY SOCIO-ECO LIVELIHOOD PROJECTS 504,000.00 504,000.00 CONSTRUCTION/REHABILITATION/ UPGRADING OF DAY CARE CENTER 504,000.00 504,000.00 CONSTRUCTION OF DAY CENTER 504,000.00 504,000.00 CONSTRUCTION OF DAY CENTER FOR OLDER SENIOR CITIZEN 504,000.00 504,000.00 CASH FOR WORK 504,000.00 504,000.00 312 SAGUDAY 3,740,000.00 - 1,000,000.00 2,140,000.00 2,000,000.00 - 500,000.00 1,500,000.00 - 560,000.00 1,000,000.00 - - - 12,440,000.00 ORGANIC AGRICULTURE TECHNO DEMO FARM 1,240,000.00 1,240,000.00 FARM EQUIPMENT (HAND TRACTOR TURTLE TYPE, AND THRESHER) 500,000.00 500,000.00 CONFINED CATTLE FATTENING 500,000.00 500,000.00 DUCK PRODUCTION 500,000.00 500,000.00 MUSHROOM - VERMICOMPOSTING PRODUCTION TECHNOLOGY 500,000.00 500,000.00 SEASON-LONG FARMERS FIELD SCHOOL ON ORGANIC CROP PRODUCTION 500,000.00 500,000.00 CAUAYAN/BAMBOO PROPAGATION AND PRODUCTION 500,000.00 500,000.00 PLANTING OF FIRE TREE ALONG NATIONAL ROADS, AND BAMBOO/ KAWAYAN ALONG RIVERBANKS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR/REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 REPAIR/REHABILITATION OF SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 PROCUREMENT OF 855 SEATS FOR ELEMENTARY LEVEL 500,000.00 500,000.00 GULAYAN SA PAARALAN (14 SCHOOLS) 140,000.00 140,000.00 CHLORINATION OF EXISTING LEVEL I WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 1,500,000.00 1,500,000.00 UPGRADING OF RHU SAGUDAY BY PROVISION OF EQUIPMENTS AND MEDICAL INSTRUMENTS 500,000.00 500,000.00 VULCANIZING SHOP/COMPRESSOR, MOTORCYCLE TIRE SHOP(CS0S, POS,PWD) 500,000.00 500,000.00 NEGO KART 500,000.00 500,000.00 STARTER KIT 500,000.00 500,000.00 CORE SHELTER PROG(20 UNITS) 560,000.00 560,000.00 NATIVE CAKE PRODUCTION 500,000.00 500,000.00 IN-HOUSE VALUE-ADDING AGRI-PRODUCTS PROCESSING 500,000.00 500,000.00 REGION III 397,241,859.17 22,389,143.00 7,545,000.00 213,729,317.79 240,342,279.42 1,200,000.00 162,889,311.74 35,203,952.61 13,122,000.00 345,174,004.33 61,437,411.27 500,000.00 24,136,000.00 103,488,209.69 1,628,398,489.02 PROVINCE OF AURORA 27,130,075.00 973,000.00 3,325,000.00 12,611,520.00 15,628,400.00 - 8,191,264.00 520,800.00 874,000.00 18,954,150.00 6,703,630.00 - 1,275,000.00 4,342,000.00 100,528,839.00 313 BALER 1,473,000.00 973,000.00 1,650,000.00 425,000.00 3,280,000.00 - 1,361,500.00 - - 1,500,000.00 1,838,000.00 - - - 12,500,500.00 INTEGRATED FARMING PROJECT 433,000.00 433,000.00 PROVISION OF NATURAL FEED PROCESSING EQUIPMENT FOR SMALL AND LARGE RUMINANTS 496,000.00 496,000.00 PROVISION OF BOAT AND FISHING MATERIALS LOGISTICAL SUPPORT 544,000.00 544,000.00 IMPROVEMENT OF SIDE SLOPE PROTECTION OF UPSTREAM SECTION OF PINGIT COMMUNAL IRRIGATION SYSTEM (CIS) 973,000.00 973,000.00 REHABILITATION OF DEGRADED WATERSHED AREAS 1,650,000.00 1,650,000.00 MINOR REPAIR AND IMPROVEMENT OF 15 CLASSROOMS/ EDUCATIONAL FACILITIES 425,000.00 425,000.00 VARIOUS PROJECTS 3,280,000.00 3,280,000.00 CONSTRUCTION/IMPROVEMENT OF CONCRETE GROUTED RIPRAP ALONG WATER WAY OUTLET - LOCAL FLOOD EARLY WARNING SYSTEM - CONSTRUCTION OF EVACUATION CENTER - HEALTH FACILITIES ENHANCEMENT PROGRAM 637,500.00 637,500.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTIRION (MNCHN) 724,000.00 724,000.00 VARIOUS LIVELIHOOD PROJECTS 1,500,000.00 1,500,000.00 LIVELIHOOD ASSISTANCE (STARTER KIT / NEGO KART PROJECT) - KC: CASH FOR WORK - LIVELIHOOD ASSISTANCE: CAPITAL ASSISTANCE - INTEGRATED LRED PROGRAM FOR SME DEVELOPMENT AND INVESTMENT PROMOTION IN BALER 967,000.00 967,000.00 YAMAN PINOY: MARKETING PROMOTION; PARTICIPATION ON TOURISM / TRADE FAIR; CONDUCT OF LOCAL AGRI, TOURISM / TRADE FAIR 871,000.00 871,000.00 314 CASIGURAN 2,960,000.00 - - 2,064,000.00 - - 2,664,080.00 - - 2,000,000.00 - - - 2,812,000.00 12,500,080.00 INFRASTRACTURE SUPPORT TO AGRICULTURAL AND FISHERY PRODUCTION AND DEVELOPMENT 800,000.00 800,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRIBUSSINESS ACTIVITIES 480,000.00 480,000.00 POST HARVEST FACILITIES AND EQUIPMENT 480,000.00 480,000.00 COLD STORAGE 1,200,000.00 1,200,000.00 REPAIR/REHABILITATION OF CLASSROOM 1,352,000.00 1,352,000.00 GULAYAN SA PAARALAN 152,000.00 152,000.00 INNOVATIVE PROGRAM/ABOT ALAM 560,000.00 560,000.00 BEMONC TRAINING, INFANT AND CHILD PROGRAM & NUTRITION PROGRAM 1,420,000.00 1,420,000.00 COMMUNITY HEALTH TEAM (CHT) 510,000.00 510,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM (HFEP) 734,080.00 734,080.00 CONSTRUCTION OF GROUP HAND-WASHING FACILITY IN DCC WITH COMPLETE SET OF SOAP,FLOURIDE GEL, AND TOOTH PASTE 400,000.00 400,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DCC/SUPERVISED NEIGHBORHOOD PALYGROUPS 400,000.00 400,000.00 CONTINUOUS CAPABILITY BUILDING OF DCW, SNP VOLUNTEER AND PES WORKER 400,000.00 400,000.00 PROVISION OF SKILLS AND LEADERSHIP TRAINING CUM LIVELIHOOD PROGRAM FOR INDIGENT OSY,4P'S PWD,KALIPI/CWF AND IP'S 800,000.00 800,000.00 PROJECT TO BE DETERMINED 2,812,000.00 2,812,000.00 315 DILASAG 694,400.00 - - 434,000.00 4,948,400.00 - 1,822,800.00 520,800.00 434,000.00 3,645,600.00 - - - - 12,500,000.00 POST HARVEST MECHANICAL FACILITY AND ORGANIC FERTILIZER PRODUCTION 694,400.00 694,400.00 REPAIR OF HIGH SCHOOL BUILDING 434,000.00 434,000.00 VARIOUS PROJECTS 4,948,400.00 4,948,400.00 CONSTRUCTION OF EVACUATION CENTER - REPAIR OF DICABASAN BRIDGE - PAGBASA NUTRITION SERVICES 520,800.00 520,800.00 PROVISSIONS OF MEDICAL ASSISTANCE THRU RN HEALS 434,000.00 434,000.00 REPAIR OF HEALTH STATION 434,000.00 434,000.00 SKILLS TRAINING OF DHT RURAL HEALTH MEDICINES THRU RN HEALS 434,000.00 434,000.00 TULONG PANGKABUHAYAN PARA SA ATING DISADVANTAGED 520,800.00 520,800.00 REHAB. OF TOURISM SITE AND FACILITIES 434,000.00 434,000.00 IMPROVEMENT OF DAY CARE CENTER 607,600.00 607,600.00 REPAIR OF CIC ADDITIONAL FUND 434,000.00 434,000.00 KC: CASH FOR WORK 868,000.00 868,000.00 LIVELIHOOD PROGRAM 1,736,000.00 1,736,000.00 316 DINALUNGAN 8,076,875.00 - - 2,000,000.00 - - 1,012,434.00 - - 760,000.00 1,178,950.00 - - - 13,028,259.00 ESTABLISHMENT OF LIVELIHOOD TRAINING AND PROCESSING CENTER 700,000.00 700,000.00 TILAPIA HATCHERY 475,000.00 475,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROVISION OF FLATBED DRYING FACILITY 1,425,000.00 1,425,000.00 ESTABLISHMENT OF INTEGRATED ORGANIC BASED FARMING AND VERMI-COMPOSTING 486,875.00 486,875.00 FISHING PROCESSING CENTER FOR TINAPA AT DAING 475,000.00 475,000.00 SHALLOWPAYAO WITH PATROL BOAT AND OPERATIONAL CAPITAL 950,000.00 950,000.00 INTEGRATED ENVIRONMENTAL LIVELIHOOD PROGRAM FOR (FISHERFOLKS) COASTAL, UPLAND FARMERS AND URBAN OR PA OCCUPANTS CONSTITUENTS IN DINALUNGAN 1,615,000.00 1,615,000.00 HOG RAISING 1,000,000.00 1,000,000.00 FISHING BOAT WITH LAMBAT 950,000.00 950,000.00 REPAIR/REHABILITATION OF 33 CLASSROOMS OF 10 SCHOOLS IN DINALUNGAN DISTRICT 2,000,000.00 2,000,000.00 COMMUNITY HEALTH TEAM ANNUAL CENSUS AND MONTHLY UPDATING OF FAMILY PROFILE 1,012,434.00 1,012,434.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR SOLO PARENT, PWDS AND WOMEN 760,000.00 760,000.00 INTEGRATED LRED PROGRAM FOR SME DEVELOPMENT AND INVESTMENT PROMOTION IN DINALUNGAN 1,178,950.00 1,178,950.00 317 DINGALAN 4,436,000.00 - 425,000.00 1,700,000.00 - - 1,330,450.00 - - 3,333,550.00 - - 1,275,000.00 - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS: FISH VENDING, VEGETABLES VENDING, PROCUREMENT OFVEGETABLES SEEDS, MOTORIZED BANCAWITH FISH NET; BANANA(SABA) EXPANSION PROJECT; TRANSPORTER(AGRICULTURAL PRODUCTS), FERTILIZER COUNTER PARTING, SWINE DISPERSAL, PURCHASE OF RICEMILLING FACILITIES/MOBILE ECONO AND CAPABILITY BUILDING 4,436,000.00 4,436,000.00 NATIONAL GREENING PROGRAM (FRUIT TREES) 425,000.00 425,000.00 REHABILITATION OF TWO 2-CL BLDNG. AND REPAIR OF 2-CL BLDG. (MATAWE E.S.) 425,000.00 425,000.00 REPAIR OF THE TWO 1-CL BLDG., ONE 2-CL BLDG. AND ONE 3 CL- BLDG. (IBONA HS) 425,000.00 425,000.00 REHABILITATION OF THREE 2-CL BLDG. (DINGALAN CENTRAL SCHOOL) 425,000.00 425,000.00 REHABILITAION OF ONE 2-CL BLDG. AND REPAIR OF TWO 2 CL- BLDG. (UMIRAY, ES) 425,000.00 425,000.00 ACQUISITION OF PRIMARY CARE BENEFIT PACKAGE FOR RHU 599,450.00 599,450.00 REPAIR OF BARANGAY PALTIC BHS 731,000.00 731,000.00 REPAIR AND IMPROVEMENT OF DAY CARE CENTER 1,529,400.00 1,529,400.00 PROGRAM OF MATERIALS AND PLAYGROUND FACILITIES AND BUILDING FOR DC WORKERS/SNP VOLUNTEERS(20OCWAND 7SNP VOLUNTEERS) 849,600.00 849,600.00 LIVELIHOOD PROGRAM FOR WOMEN 529,550.00 529,550.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK: BANANA TRADING, CAPITAL ON BANANA PROCESSING, PALAY/RICE TRADING 425,000.00 425,000.00 HOME-BASED TRAINING ON WELDING,HOUSEKEEPING,BARTENDING AND FOOD TECHNOLOGY 1,275,000.00 1,275,000.00 318 DIPACULAO 4,500,000.00 - - - 6,000,000.00 - - - - 2,000,000.00 - - - - 12,500,000.00 FARM SUPPLY AND FARM EQUIPMENT 1,500,000.00 1,500,000.00 ORGANIC FERTILIZERS, PESTICIDES CUM VEGETABLE PRODUCTION 1,000,000.00 1,000,000.00 ENHANCING FISH PRODUCTION OF THE FISHERFOLKS IN THE MUNICIPALITY OF DIPACULAO, AURORA 2,000,000.00 2,000,000.00 EVACUATION FACILITY-1 UNIT STANDARD EVACUATION CENTER (TWO STOREY, 4 ROOM BUILDING) 5,100,000.00 5,100,000.00 PROCUREMENT OF RESCUE EQUIPMENT 900,000.00 900,000.00 REHABILITATION OF SENIOR CITIZEN DAY CENTER WITH COMPLETE FACILITIES 1,000,000.00 1,000,000.00 PROGRAM MATERIALS AND PLAYGROUND FACILITIES 1,000,000.00 1,000,000.00 319 MARIA AURORA 2,175,000.00 - 1,250,000.00 1,000,000.00 1,400,000.00 - - - - 2,645,000.00 2,500,000.00 - - 1,530,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 1,175,000.00 1,175,000.00 NATIONAL GREENING PROGRAM (NGP) 500,000.00 500,000.00 NATIONAL GREENING PROGRAM (NGP) 400,000.00 400,000.00 NATIONAL GREENING PROGRAM (NGP) 350,000.00 350,000.00 BASIC EDUCATION FACILITIES: 1,000,000.00 1,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 400,000.00 400,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,645,000.00 1,645,000.00 SHARED SERVICE FACILITY 2,000,000.00 2,000,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) 250,000.00 250,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM 250,000.00 250,000.00 PROJECT TO BE DETERMINED 1,530,000.00 1,530,000.00 320 SAN LUIS 2,814,800.00 - - 4,988,520.00 - - - - 440,000.00 3,070,000.00 1,186,680.00 - - - 12,500,000.00 STRENGTHENING OF FARMERS COOPERATIVE AND ASSOCIATION THROUGH PROVISION OF CAPABLILITY CAPACITY BUILDING PROGRAM FARMERS & FISHERIES 430,000.00 430,000.00 MARINE RESERVE & FISH SANCTUARIES 434,800.00 434,800.00 VARIOUS AGRICULTURE PROJECTS 1,950,000.00 1,950,000.00 ORGANIC FERTILIZERS SUBSIDY - CONSTRUCTIONS OF TRADING POST - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY DEVELOPMENT - SUSTAINABLE AGRI FISHERY BASED LIVELIHOOD & OTHER AGRI- FISHERY INVESTMENTS & TRAININGS - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS FEEDING PROGRAM GULAYAN SA PAARALAN 440,000.00 440,000.00 REPAIR/REHABILITATION PROGRAM ON CLASSROOMS 3,500,000.00 3,500,000.00 PROVISION OF ARMCHAIRS/DESKS CHAIRS AND TABLETS 608,520.00 608,520.00 PROVISION OF ALS, MISOSA AND OTHER ALTERNATIVEN DELIVERY MODULES (ADM) 440,000.00 440,000.00 SAN LUIS TOURISM INDUSTRY PROMOTION AND PROMOTION AND DEVELOPMENT OFFICE 440,000.00 440,000.00 KAALAMAN AT KASANAYAN NG KABATAAN CENTER (K NA K CENTER) 1,760,000.00 1,760,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR WOMEN AND YOUTH 880,000.00 880,000.00 CREDIT PROGRAM FOR COOPERATIVES AND ASSOCIATIONS 430,000.00 430,000.00 ESTABLISHMENT OF AN OTOP STORE AND TRAINING CENTER IN SAN LUIS 1,186,680.00 1,186,680.00 PROVINCE OF BATAAN 29,161,074.98 - 1,450,000.00 13,113,983.95 23,096,375.48 - 15,493,624.34 3,684,720.00 4,578,000.00 36,678,511.00 7,931,710.27 - 8,140,000.00 6,672,000.00 150,000,000.02 321 ABUCAY 1,520,000.00 - - 590,000.00 1,000,000.00 - 2,960,000.00 990,000.00 - 4,550,000.00 - - 890,000.00 - 12,500,000.00 FISHERY PRODUCTION AND DEVELOPMENT (MOTORIZE FISHING BOATS AND FISHNETS) 520,000.00 520,000.00 IRRIGATION PROJECT (REHABILITATION OF LABANGAN-LANGGO IRRIGATION SYSTEM AND OPENING OF IRRIGATION GOING TO MABATANG AND BINAYAN DIVERSION DAM IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES: REPAIR / REHAB OF CLASSROOMS AND PROVISION OF SCHOOL FURNITURES 590,000.00 590,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 FLOOD CONTROL - CONSTRUCTIOIN OF CANALS 500,000.00 500,000.00 VARIOUS PROJECTS 2,960,000.00 2,960,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (PROVISION OF EQUIPMENTS AND INSTRUMENTS) - HEALTH FACILITIES ENHANCEMENT PROGRAM: (CONSTRUCTION OF BRGY. HEALTH STATION) - DOLE INTEGRATED LIVELIHOOD PROGRAM (DLIP):TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 990,000.00 990,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICROENTERPRISE DEVELOPMENT TRACK (LIVELIHOOD PROJECTS LIKE PERFUME, DISHWASHING SOAP, POWDER, TOILET CLEANING BUSINESS, CANDLE MAKING) 1,750,000.00 1,750,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF DAY CARE CENTER AND BAHAY-PAG-ASA) 2,300,000.00 2,300,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING 500,000.00 500,000.00 SKILLS TRAINING (DRESSMAKING, ELECTRICAL, WELDING, PIPEFITTING) INCLUDING TRAINING MATERIALS AND EQUIPMENTS 890,000.00 890,000.00 322 BAGAC 2,423,932.13 - - 1,755,412.52 1,430,661.20 - 2,837,624.34 - - 3,613,516.68 438,853.13 - - - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,844,646.00 1,844,646.00 AGRO-PROCESSING FACILITIES (FOOD PROCESSING) - INFRASTRUCTURE SUPPORT TO AGRICULTURE - POST-HARVEST FACILITIES AND EQUIPMENT - FISHERY PRODUCTION AND DEVELOPMENT 579,286.13 579,286.13 BASIC EDUCATION FACILITIES: (REPAIR/REHABILITATION OF CLASSROOMS AND PROVISION OF SCHOOL FURNITURES) 1,755,412.52 1,755,412.52 SALINTUBIG (REHABILITATION / EXPANSION / UPGRADING OF LEVEL II WATER SUPPLY SYSTEMS INCLUDING APPROPRIATE WATER TREATMENT SYSTEMS) 1,430,661.20 1,430,661.20 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION TRAINING 270,333.53 270,333.53 HEALTH FACILITIES ENHANCEMENT FACILITIES ENHANCEMENT PROGRAM 1,316,559.39 1,316,559.39 HEALTH FACILITIES ENHANCEMENT FACILITIES ENHANCEMENT PROGRAM (REPAIR OF BARANGAY HEALTH CENTER) 877,706.26 877,706.26 INFECTIOUS DISEASES - TRAINING ON MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 373,025.16 373,025.16 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 1,404,330.02 1,404,330.02 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO FINANCE 438,853.13 438,853.13 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 438,853.13 438,853.13 PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS (REPAIR AND REHAB OF DAY CARE CENTER) 453,774.14 453,774.14 PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS (CONSTRUCTION DAY CARE CENTER & PLAYGROUND EQUIPMENT) 575,775.31 575,775.31 PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS (CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS) 301,930.95 301,930.95 SHARED SERVICE FACILITY 438,853.13 438,853.13 323 BALANGA CITY 1,250,000.00 - - - - - - - 4,578,000.00 - - - - 6,672,000.00 12,500,000.00 POST-HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT) 250,000.00 250,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 1,000,000.00 1,000,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS (DEVELOPMENT OF PICNIC GROVE AND RIVER RESORT AND MANGROVE TRAIL AT THE BALANGA CITY WETLAND AND NATURE PARK (BWNP) 4,578,000.00 4,578,000.00 PROJECT TO BE DETERMINED 6,672,000.00 6,672,000.00 324 DINALUPIHAN 1,000,000.00 - - - 2,500,000.00 - 2,500,000.00 - - 6,500,000.00 - - - - 12,500,000.00 TRAININGS & SEMINARS TO FARM COOPERATIVES ON AGRICULTURE (FISHERIES) 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION FACILITY 2,500,000.00 2,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (CONSTRUCTION OF BARANGAY HEALTH STATION) 2,500,000.00 2,500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS - CONSTRUCTION AND REPAIR / UPGRADING OF DAY CARE CENTER 1,500,000.00 1,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 5,000,000.00 5,000,000.00 325 HERMOSA - - - 2,000,000.00 1,680,000.00 - 1,870,000.00 1,194,720.00 - 1,805,280.00 3,950,000.00 - - - 12,500,000.00 BASIC EDUCATION FACILITIES - REPAIR / REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES - REPAIR / REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 560,000.00 560,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 560,000.00 560,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 560,000.00 560,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 1,150,000.00 1,150,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM, TRAINING CUM DEVELOPMENT 720,000.00 720,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 594,720.00 594,720.00 OFW'S REINTEGRATION PROGRAM 600,000.00 600,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT 805,280.00 805,280.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 YAMAN-PINOY 750,000.00 750,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 2,600,000.00 2,600,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) FORMULATION OF MUNICIPALITY INVESTMENT CODE 600,000.00 600,000.00 326 LIMAY 5,607,142.85 - - 3,678,571.43 1,785,714.28 - - - - 535,714.32 892,857.14 - - - 12,500,000.02 VARIOUS AGRICULTURE PROJECTS 3,375,000.00 3,375,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND DEVELOPMENT (TRACTOR) - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND DEVELOPMENT (THRESHER) - POST HARVEST FACILITIES AND EQUIPMENT - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - MARINE PROTECTED AREAS 1,339,285.71 1,339,285.71 ORGANIC FERTILIZER PRODUCTION 892,857.14 892,857.14 BASIC EDUCATION FACILITIES: - REPAIR/REHABILITATION OF CLASSROOMS AND PROVISION OF SCHOOL FURNITURES 3,678,571.43 3,678,571.43 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 892,857.14 892,857.14 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 892,857.14 892,857.14 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 535,714.32 535,714.32 YAMAN PINOY 892,857.14 892,857.14 327 MARIVELES 3,400,000.00 - - 600,000.00 - - 576,000.00 1,500,000.00 - 4,924,000.00 - - 1,500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,400,000.00 3,400,000.00 IRRIGATION PROJECTS - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS (ESTABLISHMENT OF PAYAO PROJECT) - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (MOTORIZED FISHING BOAT AND FISH NETS) - TRADING POST - BASIC EDUCATION FACILITIES:PROVISION OF SCHOOL FURNITURE 600,000.00 600,000.00 RURAL HEALTH MIDWIFE PLACEMENT AT BNS AND BEMONCS AND BNS 576,000.00 576,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) 1,500,000.00 1,500,000.00 VARIOUS CDD PROJECTS 3,537,000.00 3,537,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT (CONSTRUCTION OF DAY CARE CENTERS) - PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT (REPAIR AND UPGRADING OF DAY CARE CENTERS) - SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,387,000.00 1,387,000.00 SKILLS TRAINING INCLUDING TRAINING MATERIALS AND EQUIPMENTS 1,500,000.00 1,500,000.00 328 MORONG 1,250,000.00 - 450,000.00 2,100,000.00 2,400,000.00 - 1,750,000.00 - - 3,600,000.00 450,000.00 - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,250,000.00 1,250,000.00 POST-HARVEST FACILITIES AND EQUIPMENTS (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT) - IRRIGATION PROJECT (5 UNITS SHALLOWTUBE WELL) - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION (MOTORIZED FISHING BOATS AND FISHNETS) - NATIONAL GREENING PROGRAM (MABAYO WATERSHED) 450,000.00 450,000.00 BASIC EDUCATION FACILITIES - REPAIR/REHAB OF CLASSROOMS 1,600,000.00 1,600,000.00 BASIC EDUCATION FACILITIES - PROVISION OF SCHOOL FURNITURES 500,000.00 500,000.00 VARIOUS PROJECTS 2,400,000.00 2,400,000.00 FLOOD CONTROL (REPAIR OF CANAL/DRAINAGE) - FLOOD CONTROL (CONSTRUCTION OF SEA WALL) - EVACUATION FACILITY - PROCUREMENT OF RESCUE EQUIPMENT - HEALTH FACILITIES ENHANCEMENT PROGRAM 1,300,000.00 1,300,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 450,000.00 450,000.00 PROTECTIVE SERVICES INFRA PROJECTS (BAHAY SILUNGAN) 900,000.00 900,000.00 PROTECTIVE SERVICES INFRA PROJECTS (DAY CARE CENTER) 1,800,000.00 1,800,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE LIVELIHOOD PROGRAM - FOR 4PS AND NON-4PS, SENIOR CITIZENS, WOMEN 450,000.00 450,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - 50 PWDS, YOUTH 450,000.00 450,000.00 LRED 450,000.00 450,000.00 SKILLS TRAINING (TIG WELDING, AIRCON AND REFRIGERATION, COMPUTER HARDWARE, INDUSTRIAL SEWING, BARTENDING) 500,000.00 500,000.00 329 ORANI 5,110,000.00 - - 1,390,000.00 - - 1,500,000.00 - - 2,750,000.00 - - 1,750,000.00 - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION ND DEVELOPMENT (TRACTOR AND HARVESTER) 2,650,000.00 2,650,000.00 FISHERY PRODUCTION AND DEVELOPMENT(MOTORIZE FISHING BOATS AND FISHNETS) 1,350,000.00 1,350,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS (BAGOONG PRODUCTION) 1,110,000.00 1,110,000.00 BASIC EDUCATIONAL FACILITIES REPAIR/REHAB OF CLASSROOMS AND PROVISION OF SCHOOL FURNITURES 890,000.00 890,000.00 INNOVATIVE PROGRAMS / ABOT-ALAM PROGRAM 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (REPAIR/REHAB OF MULAWIN & TAPULAO BRGY. HEALTH STATION) 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES-CAPABILITY BUILDING 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM-MICROENTERPRISE DEVELOPMENT TRACK 1,750,000.00 1,750,000.00 SKILLS TRAINING INCLUDING TRAINING MATERIALS AND EQUIPMENTS 1,750,000.00 1,750,000.00 330 ORION 1,000,000.00 - - 1,000,000.00 3,100,000.00 - 1,500,000.00 - - 3,400,000.00 500,000.00 - 2,000,000.00 - 12,500,000.00 MARINE RESERVE FISH SANCTUARY 1,000,000.00 1,000,000.00 REPAIR & REHAB OF CLASSROOM AND PROVISION OF FURNITURES 1,000,000.00 1,000,000.00 SALINTUBIG 1,000,000.00 1,000,000.00 EVACUATION FACILITY 2,100,000.00 2,100,000.00 CHT MOBILIZATION 500,000.00 500,000.00 HEALTH EMERGENCY MGMT. 500,000.00 500,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 SLP: SKILL TRAINING / CAPABILITY BUILDING 1,900,000.00 1,900,000.00 YAMAN PINOY 500,000.00 500,000.00 MANPOWER DEVT PROGRAM (TRAINING AND PURCHASE OF TRAINING MATERIALS 2,000,000.00 2,000,000.00 331 PILAR 2,800,000.00 - - - 4,500,000.00 - - - - 3,000,000.00 1,700,000.00 - 500,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 1,500,000.00 1,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY (PURCHASE OF HANDTRACTOR) - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY (PURCHASE OF FISHING BOAT) - ORGANIC FERTILIZER PRODUCTION (PROCUREMENT OF 5 UNIT SHREDDER) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD PROGRAM (TAHONG CULTURE AND CAPIZ CULTURE) - MARINE RESERVE AND FISH SANCTUARIES 1,300,000.00 1,300,000.00 PROVISION OF POTABLE WATER-SALINTUBIG (REHABILITATION, EXPANSION & UPGRADING OF LEVEL III WATER SUPPLY SYSTEM) 4,000,000.00 4,000,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (BAHAY SILUNGAN) 2,000,000.00 2,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (REPAIR OF DAY CARE CENTER) 300,000.00 300,000.00 SUSTAINABLE LIVELIHOOD PROGRAM MICRO-ENTERPRISE DEVELOPMENT TRACK 700,000.00 700,000.00 SHARED SERVICE FACILITIES 700,000.00 700,000.00 OTOP STORE EXPRESS 1,000,000.00 1,000,000.00 SKILLS TRAINING FOR THE YOUTH (WELDING, BARTENDING, HOUSEKEEPING AND OTHERS) 500,000.00 500,000.00 332 SAMAL 3,800,000.00 - 1,000,000.00 - 4,700,000.00 - - - - 2,000,000.00 - - 1,000,000.00 - 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 3,800,000.00 3,800,000.00 ORGANIC FERTILIZER PRODUCTION - SUSTAINABLE AGRI-FISHERY-BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION - NATIONAL GREENING PROGRAM (NGP) 1,000,000.00 1,000,000.00 EVACUATION FACILITY 4,700,000.00 4,700,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECT (CONSTRUCTION OF BAHAY PAG-ASA) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 TECHNICAL VOCATIONAL TRAINING / COMMUNITY BASED TRAINING 1,000,000.00 1,000,000.00 PROVINCE OF BULACAN 66,096,693.28 5,567,143.00 - 34,645,571.00 29,926,400.00 1,200,000.00 34,509,736.00 12,982,150.00 - 85,842,285.72 8,944,571.00 - 2,660,000.00 15,395,100.00 297,769,650.00 333 ANGAT 2,300,000.00 - - - 3,000,000.00 - - - - 3,500,000.00 500,000.00 - - 3,200,000.00 12,500,000.00 POST HARV EST FACILITIES & EQUIPEMENT (MECHANICAL DRYER) 2,300,000.00 2,300,000.00 REHABILITATION OF ILLESCAS ST. BRGY. SAN ROQUE & SANTA TERESITA MONICA & BRGY. STO CRISTO 3,000,000.00 3,000,000.00 SLP: NEWSPAPER BAG MAKING - TRAINING & CAPITALIZATION 500,000.00 500,000.00 REHABILITATION OF DAY CARE 2,500,000.00 2,500,000.00 PROVISION OF ECCD 500,000.00 500,000.00 YM: LIVELIHOOD TRAINING PROGRAM FOR COOPERATIVE MEMBER2 - MEAT PROCESSING & VEGETABLE PRODUCTION/PRESERVATION 500,000.00 500,000.00 CONCRETING OF NIUGAN ROAD TO PALTOK ROAD 3,200,000.00 3,200,000.00 334 BALAGTAS 2,400,000.00 1,910,000.00 - 1,810,000.00 880,000.00 - 1,500,000.00 - - 2,500,000.00 - - 1,500,000.00 - 12,500,000.00 REHABILITATION OF CANALS/IRRIGATION SYSTEM 1,910,000.00 1,910,000.00 MECHANICAL DRYERS 2,400,000.00 2,400,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS GULAYAN SA PAARALAN 120,000.00 120,000.00 INNOVATIVE PROGRAM (ALS) 690,000.00 690,000.00 PROVISION OF SCHOOL FURNITURE 1,000,000.00 1,000,000.00 DISASTER PREPAREDNESS PROGRAM - PURCHASE OF DISASTER OPERATION EQUIPMENT 880,000.00 880,000.00 A. RABIES ELIMINATION 1,500,000.00 1,500,000.00 REPAIR /UPGRADING OF DAY CARE CENTER/FEEDING CENTER 2,000,000.00 2,000,000.00 REPAIR OF TRAINING CENTER 500,000.00 500,000.00 SLP: TRAINING ON SEWING,BEAUTY CARE,NOVELTIES AND ACCESSORIES,FAN MAKING,FOOD PRESERVATION 1,500,000.00 1,500,000.00 335 BALIUAG 1,100,000.00 - - 1,300,000.00 2,450,000.00 - 750,000.00 - - 4,200,000.00 2,700,000.00 - - - 12,500,000.00 FINGERLINGS DISPOSAL 500,000.00 500,000.00 SUSTAINABLE AGRIFISHERY BASED LIVELIHOOD: MEAT PROCESSING 600,000.00 600,000.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 ABOT ALAM PROGRAM 1,000,000.00 1,000,000.00 FLOOD CONTROL 2,450,000.00 2,450,000.00 MATERNAL/NATAL FACILITIES 750,000.00 750,000.00 SLP: TINDAHAN SA NAYON 1,200,000.00 1,200,000.00 WOMEN I9N CRISIS CENTER 2,500,000.00 2,500,000.00 PROJECT TO BE DETERMINED (CDD PROJECT) 500,000.00 500,000.00 YAMAN PINOY 900,000.00 900,000.00 OTOP STORE EXPRESS 1,800,000.00 1,800,000.00 336 BOCAUE 500,000.00 - - 850,000.00 2,000,000.00 - 3,000,000.00 1,550,000.00 - 4,000,000.00 600,000.00 - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 REPAIR AND REHABILITATION OF CLASSROOMS PHASE II 850,000.00 850,000.00 CONSTRUCTION OF CANALS AND WATERWAYS 2,000,000.00 2,000,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM-WEIGHING SCALES, NEBULIZERS, BP APARTUS, MINOR SURGICAL SETS, DELIVERY SETS, REFRIGERATORS FOR VACCINES 1,000,000.00 1,000,000.00 REHABILITATION OF BRGY HEALTH STATIONS 2,000,000.00 2,000,000.00 INCOME AUGMENTATION PROGRAM-DLIP 1,040,000.00 1,040,000.00 OFWREINTEGRATION PROGRAM 510,000.00 510,000.00 SLP: GULONG PANGKABUHAYAN-SKILLS ENAHNCEMENT TRAINING 3,000,000.00 3,000,000.00 REPAIR/UPGRADING OF DAYCARE CENTERS 1,000,000.00 1,000,000.00 YAMAN PINOY: BAG MAKING 600,000.00 600,000.00 337 BULACAN 2,400,000.00 - - 1,740,000.00 450,000.00 - 2,340,000.00 1,290,000.00 - 2,600,000.00 - - - 1,680,000.00 12,500,000.00 VARIOUS AGRICULTURE PROJECTS 2,400,000.00 2,400,000.00 AGRI-FISHERY PDXN & DEV'T (TRACTOR, PLANTER/SEEDER, HARVESTER, THRESHER, MOTORIZED FISHING BOATS,FISHNETS) - OPEN SURFACE PUMP - REPAIR/UPGRADING OF CLASSROOMS 1,740,000.00 1,740,000.00 CONSTRUCTION/REHAB OF LEVEL 1 WATER SUPPLY SYSTEM - DEEP WELL 450,000.00 450,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-CONSTRUCTION OF NEWBHW 1,890,000.00 1,890,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-PURCHSE OF NEW EQUIPMENT 450,000.00 450,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM - GRANTS FOR GRADUATES 450,000.00 450,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM - ADD'TL CAPITAL FOR MARKET VENDOR GRANT ASSOCIATION 840,000.00 840,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 800,000.00 800,000.00 PROTECTIVE SERVICE -CONSTRUCTION OF DAY CARE CENTERS; REPAIR AND UPGRADING OF DAY CARE/ CONSTRUCTION OF HANDWASHING FACILITIES FOR DCC; CAP. BLDG. ECCD LEARNING MAT'LS & HYGIENE KIT/SUPERVISE NEIGHBORHOOD PLAY; CONTINUOUS CAP. BLDG FOR DAY CARE WORKERS, SOLO PARENTS, SENIOR CITIZENS, PWDS & 4PS BENEFICIARIES 1,800,000.00 1,800,000.00 COMMUNITY FOOD PRODUCTION & DEV'T 1,680,000.00 1,680,000.00 338 BUSTOS 2,000,000.00 - - - 2,000,000.00 - 3,349,400.00 - - 4,650,600.00 - - - - 12,000,000.00 POST HARVEST FACILITIES AND EQUIP 2,000,000.00 2,000,000.00 RESCUE EQUIP 2,000,000.00 2,000,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 510,300.00 510,300.00 DENGUE AND MALARIA CONTROL & OTHER INFECTIOUS DISEASES 528,850.00 528,850.00 MATERNAL, NEONATAL,CHILD HEALTH AND NUTRITION(MNCHN) 507,000.00 507,000.00 RABIES ELIMINATION 599,050.00 599,050.00 STD/HIV/AIDS 656,200.00 656,200.00 TB CONTROL 548,000.00 548,000.00 SUSTAINABLE LIVELIHOOD PROG (SLP) MICRO ENTERPRISE DEVT TRACK 1,650,600.00 1,650,600.00 SUSTAINABLE LIVELIHOOD PROG (SLP) MICRO ENTERPRISE DEVT TRACK 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES- INFRA PROJ 2,000,000.00 2,000,000.00 339 CALUMPIT 4,000,000.00 - - - - - - 1,000,000.00 - 7,000,000.00 500,000.00 - - - 12,500,000.00 PROVISION OF MOTORIZED BANCAS AND GILLNETETS ( 4 MOTORIZED BANCAS AT P80,000 EACH AT P 320.00,00; 933 GILLNETS AT P1,050 EACH FOR 933 FARMERS) 1,300,000.00 1,300,000.00 PROVISION OF FARM EQUIPMENTS FOR FARMERS IN CALUMPIT(PURCHASE OF 20 UNITS HAND TRACTOR AT P80,000 EACH AT P1,6000.00; 4 UNITS IRRIGATION PUMP AT P90,000 EACH AT P360,000.00 & 1 TRAILER HAND TRACTOR AT P 740,000.00) 2,700,000.00) 2,700,000.00 2,700,000.00 TULONG PANGHANAPBUHAY PARA SA MGA DISADVANTAGED WORKERS (TUPAD) EMPLOYMENT OF 1,111 WORKERS AT MINIMUM 3 DAYS AT 300 PESOS/DAY 1,000,000.00 1,000,000.00 CONSTRUCTION OF WOMEN AND CHILDREN CRISIS CENTER 3,000,000.00 3,000,000.00 CONSTRUCTION OF EVACUATION CENTER 4,000,000.00 4,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS YAMAN PINOY: CALUMPIT SOUVENIR STORE WITH SOLO PARENTS, PWD'S AND MACORCA AS PROPONENT 500,000.00 500,000.00 340 DONA REMEDIOS TRINIDAD - - - - 11,000,000.00 - - - - - - - - 1,500,000.00 12,500,000.00 PROVISION OF WATER SUPPLY 7,000,000.00 7,000,000.00 VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 CONCRETING OF RD PORTION AT SITIO MAUWAY, CAMANCHILE - CONCRETING OF RD PORTION AT SITIO MAIBOY, SAMPALOC - CONCRETING OF RD PORTION AT SITIO SILID, BAYABAS - D. INTEGRATED FOOD PDXN 500,000.00 500,000.00 CONCRETING OF ROAD PORTION AT SITIO KUTAD, CAMACHILE 1,000,000.00 1,000,000.00 341 GUIGUINTO 1,300,000.00 1,000,000.00 - 2,400,000.00 1,000,000.00 - 1,700,000.00 - - 3,460,000.00 - - - 1,640,000.00 12,500,000.00 ORGANIC COMPOST FERTILIZER PDXN 500,000.00 500,000.00 REHABILITATION OF IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 TRADING POST 800,000.00 800,000.00 REHAB/REPAIR OF CLASSROOMS 1,400,000.00 1,400,000.00 ABOT-ALAM PROGRAM 1,000,000.00 1,000,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,200,000.00 1,200,000.00 RABIES ELIMINATION/SKILLS TRAINING ON INFECTIOUS DISEASE 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: GARMENTS/RUG MAKING 1,460,000.00 1,460,000.00 SKILLS TRAINING/CAP BLDG 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: HOME CARE PDCTS, FOOD PROCESSING, RECYCLED PDCTS 1,000,000.00 1,000,000.00 CORE LOCAL ROAD MAINTENANCE/REHAB 1,640,000.00 1,640,000.00 342 HAGONOY 5,575,750.00 - - 2,550,000.00 - - - 605,400.00 - 1,520,000.00 - - - 518,500.00 10,769,650.00 IRRIGATION PROJECT 1,700,000.00 1,700,000.00 SUPPORT TO AGRICULTURE &FISHERY PDXN & DEV'T (PROVISION OF MOTORIZED FISHING BOAT & FISHFARM EQUIPMENT 3,395,750.00 3,395,750.00 AGRI-FISHERY TRAINING (CONDUCT OF FARMERS FIELD SCHOOL AND FISHERMAN FIELD SCHOOL) 480,000.00 480,000.00 BASIC EDUC. FACILITIES - REPAIR & REHAB OF PUBLIC CLASSROOMS 2,550,000.00 2,550,000.00 OFWREINTEGRATION PROGRAM: COMMUNITY BASED SKILLS TRAINING: RETURNING OFWS, 4PS BENEFICIARIES, PARENTS OF MALNOURISHED CHILDREN 605,400.00 605,400.00 REHABILITATION OF DAY CARE CENTERS 1,520,000.00 1,520,000.00 TO BE DETERMINED 518,500.00 518,500.00 343 MALOLOS CITY 4,607,143.28 357,143.00 - 1,428,571.00 - - 714,286.00 - - 3,964,285.72 1,428,571.00 - - - 12,500,000.00 PROCUREMENT OF FARM TRACTORS,MOTORIZED FISHING BOATS & FISHNETS) 3,464,286.00 3,464,286.00 VARIOUS DA PROJECTS 1,142,857.28 1,142,857.28 CONSTRUCTION OF POST HARVEST FACILITIES (FLAT BED DRYER) - ORGANIC FERTILIZER PROGRAM - MAINTENANCE OF IRRIGATION CANAL FOR AGRICULTURE 357,143.00 357,143.00 REPAIR AND REHABILITATION OF CLASSROOMS & PATHWAYS 1,428,571.00 1,428,571.00 REPAIR/UPGRADING OF HEALTH STATIONS(BHS) 714,286.00 714,286.00 REPAIR & UPGRADING OF DAY CARE CENTERS (DCC) 571,429.00 571,429.00 CONSTRUCTION/REHAB OF DAY CARE CENTERS (DCC) 2,499,999.72 2,499,999.72 SUSTAINABLE LIVELIHOOD PROGRAMS (SLP) 892,857.00 892,857.00 IMPROVEMENT OF MALOLOS TRAINING CENTER (FORMERLY TESDA -PROV'L TRAINING CENTER - SSF 1,428,571.00 1,428,571.00 344 MARILAO 1,575,000.00 800,000.00 - 3,600,000.00 - - - - - 4,009,000.00 2,516,000.00 - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD: URBAN GARDENING-TRANSFER OF TECHNOLOGY & DISTRIBUTION OF ASSORTED VEG SEEDS; MUSHROOM PDXN 575,000.00 575,000.00 REPAIR & MAINTENANCE OF COMMUNAL IRRIGATION SYS 800,000.00 800,000.00 INTERCONNECTED INCOME GENERATION FISHPEN/MINI FEEDS & FISH MEAL FACTORY & PIG DISPERSAL 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 REPAIR & REHAB OF CLASSROOM & CLRC & ENTREPRENEUR DEV'T TRAINING 2,500,000.00 2,500,000.00 EDUKASYON PARA SA OUT-OF-SCHOOL YOUTH 600,000.00 600,000.00 CHILDREN & YOUTH DEV'T PROG 1,710,000.00 1,710,000.00 PEOPLE EMPOWERMENT THRU SOCIAL WELFARE PROG & PROJECTS 2,299,000.00 2,299,000.00 OTHER SKILLS AND LIVELIHOOD TRAINING 500,000.00 500,000.00 KABUHAYAN MICROFINANCE PROGRAM; SMALL & MEDIUM SCALE INDUSTRY BASE PROJECT & IDENTIFICATION (CENSUS OF BUS ESTABLISHMENT) 475,000.00 475,000.00 IMPROVEMENT OF WORKSHOP AREA & PURCHASE OF TOOLS & EQUIP FOR TALYER NG BAYAN - SSF 1,541,000.00 1,541,000.00 345 MEYCAUAYAN CITY 1,000,000.00 - - 3,735,000.00 - - 1,000,000.00 498,000.00 - 4,600,400.00 - - 760,000.00 906,600.00 12,500,000.00 PROVISION OF FISHNETS IN SUPPORT TO FISH CULTURE 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FURNITURES : 2,400 PUPILS' DESKS/ 240 TEACHERS' TABLES/ 30 OFFICE TABLES/ 30 COMPUTERS,TABLES/25 SCHOOL CABINETS/ 25 BOOKSHELVES 2,685,000.00 2,685,000.00 REPAIR/REHAB OF CLASSROOMS 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 50,000.00 50,000.00 COMPLETION OF LAB FACILITIESFOR ALL CITY HEALTH UNITS 1,000,000.00 1,000,000.00 TUPAD - COOP SKILLS TRAINING 498,000.00 498,000.00 PROTECTIVE SERVICES - INFRA PROJECTS FOR THE DROPIN CENTER FACILITY ACQUISITION/PROCUREMENT OF EQUIPMENT REPAIR/REHAB OF DAYCARE CENTERS, CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF HAND WASHING FACILITY IN ALL DAY CARE CENTERS (W/ COMPLETE SET OF SOAP & FLOURIDE GEL) 2,640,000.00 2,640,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONTINUOUS CAPACITY BLDG OF DAY CARE WORKERS,SUPERVISE NEIGHBORHOOD PLAY (SNP) & PARENT EFFECTIVE SERVICE (PES)WORKERS 300,000.00 300,000.00 CAPACITY BLDG PROJECTS - PROVISION OF ECCD LEARNING MATERIALS FOR DCC & SUPERVISED NEIGHBORHOOD PLAYGROUNDS 380,400.00 380,400.00 CAPACITY BLDG PROJECTS - PROVISION OF HYGIENCE KIT/MATERIALS IN DAY CARE CENTERS/ SNP SITES 360,000.00 360,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: WOMEN & SOLO PARENT - MICRO TRADING/ MERCHANDISING/EATERY TYPES AND PERSONS W/ DISABILITIES -MICROTRADING/MERCHANDISING/EATERY TYPES 420,000.00 420,000.00 LIVELIHOOD PROGRAMS FOR PARENTS/CARETAKERS OF MALNOURISHED CHILDREN LIKE HAIRDRESSING, COSMETOLOGY W/ CORRESPONDING KITS 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION 906,600.00 906,600.00 VARIOUS TESDA PROJECTS 760,000.00 760,000.00 SKILLS TRAINING - BASIC WELDING COURSE; HOUSE KEEPING COURSE; AUTOMOTIVE COURSE; HAIRDRESSING COURSE; WOMEN WELFARE TRAINING(@P1,000 EACH); BASAHAN MAKING; COSMETOLOGY; BAKING PASTRY AND MASSAGE THERAPHY - PROVISION OF LIVELIHOOD TRAININGS -INDUSTRIAL SEWING MACHINE OPERATIONS - PROVISION OF INDUSTRIAL SKILLS TRAINING: BASIC ACCTG COURSE, BASIC COMPUTER COURSE, BASIC WELDING COURSE, DESIGNING COURSE - 346 NORZAGARAY 6,400,000.00 - - 800,000.00 - 1,200,000.00 400,000.00 - - 2,500,000.00 - - 400,000.00 800,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION (COMPOSTING MACHINERIES AND EQUIPMENT) 1,600,000.00 1,600,000.00 COMMUNAL IRR (CIS), POST HARVEST FACILITY, ON-FARM MACHINERY 4,800,000.00 4,800,000.00 REHABILITATION OF SELECTED CLASSROOMS 800,000.00 800,000.00 HOUSEHOLD ELECTRICIAN PROGRAM 1,200,000.00 1,200,000.00 MEDICAL ASSISTANCE TO PATIENTS NEEDING ANTI-RABIES VACCINES 400,000.00 400,000.00 IMPROVEMENT OF BLDG FOR MULTIPURPOSE(BY: MSWDO) 2,500,000.00 2,500,000.00 INTEGRATED COMMUNITY FOOD PDXN -LIVESTOCK PROJ 400,000.00 400,000.00 INTEGRATED COMMUNITY FOOD PDXN - LIVESTOCK LIVELIHOOD PROJ 400,000.00 400,000.00 TECHNICAL COMMUNITY-BASED TRAINING PROGRAM 400,000.00 400,000.00 347 OBANDO - - - - - - - - - 12,500,000.00 - - - - 12,500,000.00 PROTECTIVE SERVICES INFRASTRACTURE PROJECTS - EVACUATION CENTERS 9,500,000.00 9,500,000.00 SUSTAINALBE LIVELIHOOD PROGRAM PURCHASE OF SUPPLES, ESTABLISHMENT OF WAREHOUSE 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM-SMOKED FISH PROCESSING 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM- SPARE PARTS OUTLET FOR THE SUPPLY OF AUTOMOTIVE PARTS GREASE AND OIL 1,000,000.00 1,000,000.00 348 PANDI 1,200,000.00 - - 1,800,000.00 500,000.00 - 4,395,000.00 1,595,000.00 - 3,010,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 1,200,000.00 1,200,000.00 1. PURCHASE OF FARM EQUIPMENT ONE(1) UNIT, FOUR WHEEL HAND TRACTOR, 5 UNTIS STWMOTORS W/ PUMP - 2. POST-HARVEST FACILITY ( FLATBED DRYER, 4 UNTIS MULTI- PURPOSE DRYING PAVEMENT) - AGAP-SAGIP (BAON KAY BUNSO,FEEDING PROGRAM, REHABILITATION OF CLASSROOMS/SCHOOL FACILITIES 1,800,000.00 1,800,000.00 DISASTER RESCUE TRAINING AND EQUIPMENT 500,000.00 500,000.00 PROCUREMENT OF MEDICAL INSTRUMENT 2,195,000.00 2,195,000.00 BASIC CPR AND FIRST AID TRAINING AND MINOR REPAIR & REPAINTING OF BRGY HEALTH STATIONS 2,200,000.00 2,200,000.00 DLIP: LIVELIHOOD (A) TINDAHANG MASIPAG PANDIENO (B) LUGAWAN NI JUAN (C) COMMUNITY BASED SKILLS TRAINING AND STARTER KIT(SMAWNC II) (D) FOOD CART 1,095,000.00 1,095,000.00 DLIP: SKILLS TRAINING OF DOORMAT AND SLIPPERY MAKING 500,000.00 500,000.00 REPAIR & REHAB OF DAY CARE CENTER & INSTRUCTIONAL MATERIALS & EQUIPM 940,000.00 940,000.00 R.A 7277 & RA 9442 KNOWN AS MAGNA CARTA FOR PWD 850,000.00 850,000.00 DISABILITY PREVENTION SEMINAR AND SIGN LANGUAGE TRAINING 520,000.00 520,000.00 BUDBOD SUSTANSYA PROCESSING PARA SA MGA BATANG MABABA ANG TIMBANG 700,000.00 700,000.00 349 PAOMBONG 3,440,000.00 - - 1,620,000.00 2,690,000.00 - 500,000.00 750,000.00 - 2,250,000.00 - - - 1,250,000.00 12,500,000.00 SUSTAINABLE LIVELIHOOD TRAINING / CAPABILITY BUILDING PROJECT 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION/REHAB 1,250,000.00 1,250,000.00 TULONG PANGHANAPBUHAY PARA SA MGA DISADVANTAGED WORKERS(TUPAD) 750,000.00 750,000.00 MATERNAL,NEONATAL CHILD HEALTH NUTRITION 500,000.00 500,000.00 14. RESCUE EQUIPMENT - PROTECTIVE SERVICES / INFRA PROJECTS 750,000.00 750,000.00 REPAIR/REHAB OF CLASSROOMS 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN 120,000.00 120,000.00 5. FLOOD CONTROL - IRRIGATION PROJECTS 790,000.00 790,000.00 INFRA SUPPORT TO AGRICULTURE & FISHERY PDXN 1,300,000.00 1,300,000.00 POST HARVEST FACILITIESAND EQUIPMENT 800,000.00 800,000.00 FARM IMPLEMENTS 550,000.00 550,000.00 VARIOUS DILG PROJECTS 2,690,000.00 2,690,000.00 350 PLARIDEL 4,501,800.00 - - - 200,000.00 - 1,285,200.00 2,000,000.00 - 4,513,000.00 - - - - 12,500,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFRA SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEV'T 1,750,000.00 1,750,000.00 AGRI-FISHERY TRAINING 500,000.00 500,000.00 VARIOUS DA PROJECTS 1,751,800.00 1,751,800.00 ORGANIC FERTILIZER PDXN(VERMICULTURE FACILITIES) - ORGANIC FERTILIZER PDXN - RESCUE EQUIPMENT 200,000.00 200,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 755,000.00 755,000.00 TUBERCOLOSIS CONTROL 530,200.00 530,200.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 TUPAD 500,000.00 500,000.00 OFWREINTEGRATION PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF WOMEN AND YOUTH IN CRISIS CENTERS 2,473,000.00 2,473,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - EMPLOYMENT TRACK 2,040,000.00 2,040,000.00 351 PULILAN 500,000.00 - - - - - 8,500,000.00 - - 2,100,000.00 - - - 1,400,000.00 12,500,000.00 AGRI-FISHERY TRAINING & LIVELIHOOD 500,000.00 500,000.00 HEALTH SERVICES & FACILITIES (REPAIR 8,500,000.00 8,500,000.00 LIVELIHOOD PROGRAMS 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR 4PS BENEFICIARIES 100,000.00 100,000.00 TO BE DETERMINED 1,400,000.00 1,400,000.00 352 SAN ILDEFONSO 6,530,000.00 - - 200,000.00 - - 3,076,250.00 693,750.00 - 2,000,000.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 2,437,200.00 2,437,200.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 4,092,800.00 4,092,800.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,376,000.00 2,376,000.00 RABIES ELIMINATION 268,250.00 268,250.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 432,000.00 432,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 693,750.00 693,750.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 2,000,000.00 2,000,000.00 353 SAN JOSE DEL MONTE CITY 2,704,000.00 1,500,000.00 - - 1,056,400.00 - 999,600.00 - - 6,240,000.00 - - - - 12,500,000.00 IRRIGATION PROJECT-CANAL 1,500,000.00 1,500,000.00 VARIOUS BFAR PROJECTS 1,500,000.00 1,500,000.00 7. INFRA SUPPORT TO AGRI & FISHERY DEV'T(HAND TRACTOR, WATER PUMP AND DRYING CASE) - 8. SUSTAINABLE AGRI-FISHERY-BASED LIVELIHOOD (60 HEADS OF CATTLE) - TRADING POST 1,204,000.00 1,204,000.00 EVACUATION FACILITIES 500,000.00 500,000.00 CAPACITY BLDG FOR CSOS 556,400.00 556,400.00 HEALTH ENHANCEMENT FACILITIES PROGRAM 999,600.00 999,600.00 SUSTAINABLE LIVELIHOOD PROGRAMS 6,240,000.00 6,240,000.00 354 SAN MIGUEL 600,000.00 - - 7,100,000.00 1,000,000.00 - 1,000,000.00 - - 2,100,000.00 700,000.00 - - - 12,500,000.00 PRODUCTION OF ORGANIC FERTILIZER 600,000.00 600,000.00 REPAIR AND REHABILITATION OF CLASSROOMS 4,500,000.00 4,500,000.00 PROVISION OF SCHOOL FURNITURES (DEPED) 1,600,000.00 1,600,000.00 GULAYAN SA PAARALAN (DEPED) 1,000,000.00 1,000,000.00 RESCUE EQUIPMENT: PROCUREMENT OF MDRRMO AMBULANCE 1,000,000.00 1,000,000.00 IMPROVEMENT OF RURAL HEALTH BUILDING & SERVICES 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,100,000.00 2,100,000.00 YAMAN PINOY :SEWING MACHINES OPERATION TRAINING 700,000.00 700,000.00 355 SAN RAFAEL 8,175,000.00 - - - 1,700,000.00 - - - - 2,625,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 5,175,000.00 5,175,000.00 1. PRE/POSTHARVEST MACHINERIES - 2. POST HARVEST FACILITY AND EQUIPMENT - IRRIGATION PROJECTS 3,000,000.00 3,000,000.00 FLOOD CONTROL 1,700,000.00 1,700,000.00 SLP - M ICROENTERPRISE DEV'T TRACK 2,000,000.00 2,000,000.00 SLP - EMPLOYMENT FACILITATION 625,000.00 625,000.00 356 SANTA MARIA 3,288,000.00 - - 3,712,000.00 - - - 3,000,000.00 - - - - - 2,500,000.00 12,500,000.00 IRRIGATION PROJECT PROVISION OF 10 DIESEL PUMPS W/ ACCESSORIES AND PVC PIPES 1,150,000.00 1,150,000.00 ORGANIC FERTILIZER PDXN - VERMICOMPOSTING 588,000.00 588,000.00 INFRA SUPPORT TO AGRICULTURE DISTRIBUTION OF POWER SPRAYERS AND GRASSCUTTERS 1,550,000.00 1,550,000.00 REPAIR AND REHAB OF CLASSROOMS; PURCHASE OF FURNITURES 3,712,000.00 3,712,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS- STARTER KITS 3,000,000.00 3,000,000.00 REHABILITATION OF CORE LOCAL ROADS 2,500,000.00 2,500,000.00 PROVINCE OF NUEVA ECIJA 102,297,634.91 2,000,000.00 1,300,000.00 39,009,426.84 84,412,364.16 - 35,044,093.01 834,782.61 - 71,055,914.87 15,360,000.00 500,000.00 4,556,000.00 44,329,783.60 400,700,000.00 357 ALIAGA - - - 2,500,000.00 7,000,000.00 - - - - - 1,000,000.00 - - 2,000,000.00 12,500,000.00 BASIC EDUCATION FACILITIES: REPAIR AND REHABILITATION/ UPGRADING OF SCHOOL BUILDINGS OF 26 BARANGAYS IN ALIAGA 1,700,000.00 1,700,000.00 BASIC EDUCATION FACILITIES: ACQUISITION OF ADDITIONAL SEATS FOR PUPIL USE 800,000.00 800,000.00 VARIOUS DILG PROJECTS 7,000,000.00 7,000,000.00 DRRM: CONSTRUCTION OF 1 UNIT EVACUATION CENTER - DRRM: PROCUREMENT OF RESCUE EQUIPMENT - DRRM: CONSTRUCTION OF DRAINAGE CANAL ALONG BARANGAY POBLACION - SHARED V-SERVICE FACILITY 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 2,000,000.00 2,000,000.00 358 BONGABON 1,360,000.00 - - 800,000.00 3,341,200.00 - - - - 2,200,000.00 2,600,000.00 - 1,200,000.00 998,800.00 12,500,000.00 POST HARVEST FACILITIES AND EQUIPMENT: MECHANICAL DRYERS, MULTIPURPOSE DRYING PAVEMENT) 1,360,000.00 1,360,000.00 INNOVATIVE PROGRAMS ON ABOT-ALAM 800,000.00 800,000.00 CONSTRUCTION OF SALINTUBIG 3,341,200.00 3,341,200.00 LIVELIHOOD PROJECTS 1,600,000.00 1,600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 600,000.00 600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS YAMAN PINOY 400,000.00 400,000.00 RURAL MICROENTERPRISE DEVELOPMENT 1,200,000.00 1,200,000.00 OTOP STORE EXPRESS 1,000,000.00 1,000,000.00 TO BE DETERMINED 998,800.00 998,800.00 TECH/VOC TRAINING/ SKILLS DEVELOPMENT COURSES 1,200,000.00 1,200,000.00 359 CABANATUAN CITY - - - - 1,989,000.00 - 3,764,900.00 - - 8,816,906.00 2,900,000.00 - - 1,029,194.00 18,500,000.00 PROVISION OF WATER RESCUE MATERIALS TO FLOOD PRONE BARANGAYS 1,989,000.00 1,989,000.00 CHT MOBILIZATION 500,500.00 500,500.00 RABIES ELIMINATION THRU PROVISION OF PEP 1,670,400.00 1,670,400.00 RHU BASIC EQUIPMENT AND INSTRUMENTS FOR OPB SERVICES 1,594,000.00 1,594,000.00 ESTABLISHMENT OF RESIDENTIAL/ HOME CARE SERVICES FOR SENIOR CITIZENS 816,906.00 816,906.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS: CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN CONFLICT WITH THE LAW(CICL) 5,000,000.00 5,000,000.00 CONSTRUCTION OF EVACUATION CENTER 3,000,000.00 3,000,000.00 YAMAN PINOY 700,000.00 700,000.00 SHARED FACILITY (INDIGENT AND WOMEN ASSISTANCE PROGRAM) 2,200,000.00 2,200,000.00 TO BE DETERMINED 1,029,194.00 1,029,194.00 360 CABIAO 1,600,000.00 - - 200,000.00 1,600,000.00 - - - - 400,000.00 - - 1,200,000.00 600,000.00 5,600,000.00 ORGANIC FARMING 1,200,000.00 1,200,000.00 FISHERIES 400,000.00 400,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 EVACUATION FACILITY 1,600,000.00 1,600,000.00 DAYCARE CENTER REHABILITATION 400,000.00 400,000.00 TO BE DETERMINED 600,000.00 600,000.00 COMPUTER-BASED INSTRUCTION (E-SKWELA) TECHNICAL VOCATIONAL TRAININGS 1,200,000.00 1,200,000.00 361 CARRANGLAN 5,000,000.00 - - 3,000,000.00 - - 2,700,000.00 - - 1,000,000.00 - - - 800,000.00 12,500,000.00 AGRICULTURE: POST HARVEST FACILITY (MULTIPURPOSE DRYING PAVEMENT) 1,000,000.00 1,000,000.00 AGRICULTURE: ORGANIC FERTILIZER (VERMICULTURE) 1,000,000.00 1,000,000.00 AGRO-FACILITIES EQUIPMENT 1,000,000.00 1,000,000.00 IRRIGATION: SWIP 2,000,000.00 2,000,000.00 EDUCATION: ABOT-ALAM PROGRAM 1,000,000.00 1,000,000.00 EDUCATION: CLASSROOM REHABILITATION 2,000,000.00 2,000,000.00 CHT MOBILIZATION 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT 1,000,000.00 1,000,000.00 MATERNAL-NEONATAL CHN 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 TO BE DETERMINED 800,000.00 800,000.00 362 CUYAPO 3,500,000.00 - - 3,740,000.00 5,260,000.00 - - - - - - - - - 12,500,000.00 IRRIGATION: STW 3,500,000.00 3,500,000.00 REPAIR AND REHABILITATION OF CLASSROOMS 3,740,000.00 3,740,000.00 SALINTUBIG 3,760,000.00 3,760,000.00 REHABILITATION OF BOROBOK CREEK (PRETIL)- CANALS 1,500,000.00 1,500,000.00 363 GABALDON 7,500,000.00 - - - 5,000,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF COLD STORAGE 7,500,000.00 7,500,000.00 CONSTRUCTION OF SALINTUBIG (POTABLE WATER SUPPLY) LEVEL II WATER SYSTEMS 5,000,000.00 5,000,000.00 364 GAPAN CITY - - - - 10,900,000.00 - - - - 1,600,000.00 - - - - 12,500,000.00 SALINTUBIG 4,300,000.00 4,300,000.00 VARIOUS DILG PROJECTS 6,600,000.00 6,600,000.00 PURCHASE OF DRRM EQUIPMENT AND CAPACITY BUILDING - CONSTRUCTION OF DRAINAGE CANAL - SUSTAINABLE LIVELIHOOD PROGRAM (SLIPPER MAKING) 1,600,000.00 1,600,000.00 365 GENERAL MAMERTO NATIVIDAD 2,000,000.00 - - 1,000,000.00 4,000,000.00 - - - - 1,000,000.00 - - 500,000.00 4,000,000.00 12,500,000.00 ARCCESS PROGRAM - AGRICULTURE CONNECTIVITY 500,000.00 500,000.00 AGRICULTURE-BASED LIVELIHOOD PROGRAM 500,000.00 500,000.00 ORGANIC FARMING 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FURNITURE 1,000,000.00 1,000,000.00 PROCUREMENT OF DISASTER RESCUE EQUIPMENT AND MATERIALS 3,000,000.00 3,000,000.00 CONSTRUCTION OF SLOPE PROTECTION AT BARANGAY BALARING OVER FLOWBOX CULVERT BRIDGE 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 CONSTRUCTION OF MUNICIPAL ROAD (BRAVO-TALABUTAB NORTE BYPASS) 4,000,000.00 4,000,000.00 ALTERNATIVE/ SKILLS ENHANCEMENT PROGRAM 500,000.00 500,000.00 366 GENERAL TINIO 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 IRRIGATION PROJECTS: CONSTRUCTION OFSMALL WATER IMPOUNDING PROJECT (SWIP) 11,100,000.00 11,100,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE: SHALLOWTUBE WELL WITH ACCESSORIES 1,400,000.00 1,400,000.00 367 GUIMBA 16,500,000.00 - - - - - - - - - - - - - 16,500,000.00 VARIOUS DA PROJECTS 16,500,000.00 16,500,000.00 POST-HARVEST FACILITIES AND EQUIPMENT: CONSTRUCTION OF MULTIPURPOSE DRYING PAVEMENT - ORGANIC FERTILIZER PRODUCTION FROM MARKET WASTES - 368 JAEN 3,860,000.00 - - 640,000.00 1,500,000.00 - 4,400,000.00 - - 800,000.00 500,000.00 - - 800,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,460,000.00 1,460,000.00 SUSTAINABLE AGRI-FISHERY BASED AND OTHER AGRI-FISHERY BUSINESS INVESTMENT 800,000.00 800,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED BUSINESS ACTIVITIES 1,600,000.00 1,600,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ ABOT-ALAM PROGRAM 400,000.00 400,000.00 GULAYAN SA PAARALAN 240,000.00 240,000.00 PROCUREMENT OF RESCUE AND RESPONSE EQUIPMENT 1,500,000.00 1,500,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 400,000.00 400,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS HEALTH FACILITIES ENHANCEMENT PROGRAM 4,000,000.00 4,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM : MICROENTERPRISE DEVELOPMENT TRACK 800,000.00 800,000.00 YAMAN PINOY 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 800,000.00 800,000.00 369 LAUR 1,570,366.10 - - 3,046,338.70 4,879,862.70 - - - - 3,003,432.50 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,570,366.10 1,570,366.10 REPAIR/ REHABILITATION OF OF CLASSROOMS 3,046,338.70 3,046,338.70 VARIOUS DILG PROJECTS 4,879,862.70 4,879,862.70 REHABILITATION/ CONSTRUCTION OF DRAINAGE CANALS - PROCUREMENT OF RESCUE EQUIPMENT (AMBULANCE) - SUSTAINABLE LIVELIHOOD PROGRAM 3,003,432.50 3,003,432.50 370 LICAB 2,479,000.00 - - 2,850,000.00 1,674,000.00 - 4,997,000.00 - - - 500,000.00 - - - 12,500,000.00 SOLAR DRYER/ SHALLOWTUBE WELL 2,479,000.00 2,479,000.00 CHAIRS AND TABLES FOR CLASSROOMS 2,850,000.00 2,850,000.00 DRRM: PROCUREMENT OF FLOOD CONTROL AND RESCUE EQUIPMENT 1,674,000.00 1,674,000.00 HEALTH FACILITIES 4,997,000.00 4,997,000.00 YAMANG PINOY 500,000.00 500,000.00 371 LLANERA 6,200,000.00 - - 80,000.00 1,500,000.00 - - - - 4,720,000.00 - - - - 12,500,000.00 SUSTAINABLE AGRI-BASED LIVELIHOOD PROJECTS 2,000,000.00 2,000,000.00 COLD STORAGE 1,200,000.00 1,200,000.00 DAIRY CARACOWDISPERSAL PROJECT 3,000,000.00 3,000,000.00 GULAYAN SA PAARALAN 80,000.00 80,000.00 VARIOUS DILG PROJECTS 1,500,000.00 1,500,000.00 CONSTRUCTION OF TRANSPORT TERMINAL WITH ADMINISTRATION OFFICE - 5 DAYS TRAINING ON DISASTER MANAGEMENT AND BLS-CPR WITH PROVISION OF RESCUE EQUIPMENT - CONSTRUCTION OF DAY CARE CENTERS 1,600,000.00 1,600,000.00 CONSTRUCTION OF WOMEN, YOUTH, ELDERLY AND PWD CENTER 2,560,000.00 2,560,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR 4PS BENEFICIARIES 560,000.00 560,000.00 372 LUPAO 7,804,347.81 - - 2,521,739.14 - - 434,782.61 434,782.61 - 1,304,347.83 - - - - 12,500,000.00 IRRIGATION PROJECTS 2,717,391.32 2,717,391.32 PURCHASE OF FARM MACHINERIES 1,173,913.05 1,173,913.05 CONSTRUCTION OF FLAT-BED DRYER 3,478,260.83 3,478,260.83 ORGANIC FERTILIZER PRODUCTION 434,782.61 434,782.61 REPAIR OF CLASSROOMS 2,086,956.53 2,086,956.53 REHABILITATION OF CLASSROOM 434,782.61 434,782.61 REHABILITATION OF BARANGAY HEALTH STATIONS 434,782.61 434,782.61 LIVELIHOOD FOR OFWFAMILIES 434,782.61 434,782.61 REHABILITATION OF DAY CARE CENTER 1,304,347.83 1,304,347.83 373 MUOZ CITY - - - - - - 1,440,000.00 - - 4,160,000.00 1,500,000.00 - - - 7,100,000.00 SUPPORT FOR EQUIPMENT AND SUPPLIES FOR THE RHU (0-6 YEARS OLD) 1,200,000.00 1,200,000.00 UPGRADING AND RENOVATION OF BARANGAY HEALTH STATIONS 240,000.00 240,000.00 ECCD LEARNING MATERIALS 1,600,000.00 1,600,000.00 HANDWASHING FACILITY WITH KIT FOR DAY CARE CENTER 960,000.00 960,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR 4PS BENEFICIARIES 1,600,000.00 1,600,000.00 SHARED SERVICE FACILITY: MOBILE TRESHER AND MOBILE RICE MILL 500,000.00 500,000.00 PASALUBONG CENTER 1,000,000.00 1,000,000.00 374 NAMPICUAN - - - 4,000,000.00 - - 1,500,000.00 - - 500,000.00 500,000.00 - - 6,000,000.00 12,500,000.00 BASIC EDUCATION FACILITIES 3,000,000.00 3,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO BASIC EDUCATION/ ABOT ALAM PROGRAM TO ALS 1,000,000.00 1,000,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 500,000.00 500,000.00 DENGUE CONTROL 500,000.00 500,000.00 RABIES ELIMINATION 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT 500,000.00 500,000.00 CORE LOCAL ROAD MAINTENANCE AND REHABILITATION 6,000,000.00 6,000,000.00 375 PALAYAN CITY - - - - 4,800,000.00 - - - - - - - - 7,700,000.00 12,500,000.00 SALINTUBIG: POTABLE WATER SYSTEM 4,800,000.00 4,800,000.00 CORE LOCAL ROAD CONSTRUCTION, MAINTENANCE AND REHABILITATION FOR 19 BARANGAYS IN THE CITY 7,700,000.00 7,700,000.00 376 PANTABANGAN 2,000,000.00 - - - 1,944,500.00 - 879,495.20 400,000.00 - 4,600,000.00 - - 576,000.00 2,100,004.80 12,500,000.00 TRAMLINE 800,000.00 800,000.00 HATCHERY 1,200,000.00 1,200,000.00 SALINTUBIG: CONSTRUCTION OF LEVEL III SYSTEM 1,944,500.00 1,944,500.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 879,495.20 879,495.20 DLIP-WIN AP 400,000.00 400,000.00 CONSTRUCTION OF DAY CARE CENTER 1,400,000.00 1,400,000.00 SLP: ONION PRODUCTION 2,000,000.00 2,000,000.00 SLP: SQUASH 1,200,000.00 1,200,000.00 INTEGRATED COMMUNITY FOOD CENTER 2,100,004.80 2,100,004.80 SKILLS TRAINING 576,000.00 576,000.00 377 PEARANDA 4,800,000.00 - - - - - 1,100,000.00 - - 1,800,000.00 1,000,000.00 500,000.00 - 3,300,000.00 12,500,000.00 IRRIGATION PROJECTS 2,250,000.00 2,250,000.00 VARIOUS DA PROJECTS 2,550,000.00 2,550,000.00 ORGANIC FERTILIZER PRODUCTION - INFRASTRUCTURE SUPPORT TO AGRICULTURAL PRODUCTION AND DEVELOPMENT - POST HARVEST FACILITIES AND EQUIPMENT: MECHANICAL DRYERS, MULTIPURPOSE DRYING PAVEMENT) - HEALTH FACILITIES ENHANCEMENT PROGRAM 1,100,000.00 1,100,000.00 CONSTRUCTION OF DAY CARE CENTER 1,800,000.00 1,800,000.00 SHARED SERVICE FACILITY: FOR CALAMANSI AND MANGO PROCESSING 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION PROGRAM 1,300,000.00 1,300,000.00 CORE LOCAL ROAD CONSTRUCTION 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP): SITIO MAKABILOG ELECTRIFICATION 500,000.00 500,000.00 378 QUEZON 1,000,000.00 - - - 8,833,801.46 - 981,500.00 - - 1,684,698.54 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO ARICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTOR, PLANTER/SEEDER, HARVESTER. TRESHER, SHELLER, MOTORIZED FISHING BOAT, FISH NETS) 1,000,000.00 1,000,000.00 SALINTUBIG: EXPANSION OF LEVEL III 5,000,000.00 5,000,000.00 VARIOUS DILG PROJECTS 3,833,801.46 3,833,801.46 EVACUATION FACILITY - FLOOD CONTROL: CONSTRUCTION OF CANALS/ DRAINAGE - PUBLIC MARKET WITH TOILET - HEALTH FACILITIES ENHANCEMENT PROGRAM 981,500.00 981,500.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS : CONSTRUCTION OF DAY CARE CENTERS 991,131.54 991,131.54 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS: CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS COMPLETE WITH HANDWASHING SET 693,567.00 693,567.00 379 RIZAL 2,503,921.00 - - 1,051,349.00 3,000,000.00 - 3,125,000.00 - - 2,819,730.00 - - - - 12,500,000.00 CONSTRUCTION OF COLD STORAGE FOR ONION GROWERS (POST- HARVEST FACILITY) 2,503,921.00 2,503,921.00 ABOT-ALAM PROGRAM 1,051,349.00 1,051,349.00 EVACUATION CENTER 3,000,000.00 3,000,000.00 CONSTRUCTION OF BARANGAY HEALTH CENTER 3,125,000.00 3,125,000.00 CONSTRUCTION OF DAY CARE CENTERS 1,728,000.00 1,728,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,091,730.00 1,091,730.00 380 SAN ANTONIO - - - - 5,420,000.00 - - - - 6,000,000.00 - - 1,080,000.00 - 12,500,000.00 DISASTER EQUIPMENT FOR RESCUE 5,420,000.00 5,420,000.00 REPAIR/ CONSTRUCTION OF DAY CARE CENTER 6,000,000.00 6,000,000.00 SKILLS TRAINING 1,080,000.00 1,080,000.00 381 SAN ISIDRO - - - - 400,000.00 - - - - 2,000,000.00 - - - 10,100,000.00 12,500,000.00 REHABILITATION OF CANALS 400,000.00 400,000.00 SLP-MICRO ENTERPRISE DEVELOPMENT TRACK 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION ON DIFFERENT BARANGAYS OF THE MUNICIPALITY 10,100,000.00 10,100,000.00 382 SAN JOSE CITY 4,500,000.00 2,000,000.00 1,300,000.00 2,700,000.00 - - - - - 3,000,000.00 2,000,000.00 - - - 15,500,000.00 REHABILITATION OF IRRIGATION SYSTEM PROJECT 2,000,000.00 2,000,000.00 FARM MACHINERIES 2,000,000.00 2,000,000.00 LIVELIHOOD SUPPORT (VERMICAST PRODUCTION/ ORGANIC FERTILIZER PRODUCTION) 2,500,000.00 2,500,000.00 NATIONAL GREENING PROGRAM 1,300,000.00 1,300,000.00 ABOT-ALAM PROGRAM 2,700,000.00 2,700,000.00 CONSTRUCTION OF CRISIS INTERVENTION CENTER 2,500,000.00 2,500,000.00 ECCD LEARNING MATERIALS 500,000.00 500,000.00 ESTABLISHMENT OF PASALUBONG CENTER/ OTOP STORE EXPRESS 2,000,000.00 2,000,000.00 383 SAN LEONARDO - - - 3,100,000.00 - - 2,250,000.00 - - 6,150,000.00 1,000,000.00 - - - 12,500,000.00 BASIC EDUCATION FACILITIES 3,100,000.00 3,100,000.00 HEALTH FACILITTY EXPANDED PROGRAM AND ADDITIONAL EQUIPMENT FOR RHU 1&2 1,750,000.00 1,750,000.00 RABIES ELIMINATION 500,000.00 500,000.00 DAY CARE CENTER REHABILITATION 1,150,000.00 1,150,000.00 SELF EMPLOYMENT ASSISTANCE (FOOTWEAR MAKING) 5,000,000.00 5,000,000.00 YAMAN PINOY 1,000,000.00 1,000,000.00 384 SANTA ROSA - - - 800,000.00 4,500,000.00 - 1,900,000.00 - - 3,500,000.00 - - - 1,800,000.00 12,500,000.00 PROVISION OF CHAIRS AND TABLES FOR SCHOOLS 800,000.00 800,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 CONSTRUCTION AND REHABILITATION OF DRAINAGE CANALS - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF BARANGAY HEALTH STATION 1,000,000.00 1,000,000.00 HEALTH EQUIPMENTS AND MATERIALS 900,000.00 900,000.00 REPAIR/ UPGRADING OF DAY CARE CENTER 2,500,000.00 2,500,000.00 PROVISION OF LIVELIHOOD ASSISTANCE AND SKILLS TRAINING 1,000,000.00 1,000,000.00 CORE LOCAL ROAD REHABILITATION 1,800,000.00 1,800,000.00 385 SANTO DOMINGO 4,400,000.00 - - 3,600,000.00 - - 1,153,200.00 - - 2,746,800.00 - - - 600,000.00 12,500,000.00 CONSTRUCTION OF TRADING POST 3,500,000.00 3,500,000.00 COLD STORAGE FACILITIES 900,000.00 900,000.00 REPAIR AND REHABILITATION OF CLASSROOM BUILDING OF 4 BARANGAYS 3,600,000.00 3,600,000.00 CHT MOBILIZATION 1,153,200.00 1,153,200.00 CONSTRUCTION OF WOMEN AND CHILDREN'S CRISIS CENTER WITH DESIGNATED ROOMS FOR EACH CASES 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTER FOR 2 BARANGAYS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 746,800.00 746,800.00 TO BE DETERMINED 600,000.00 600,000.00 386 TALAVERA 2,720,000.00 - - - 1,600,000.00 - 2,768,215.20 - - 2,400,000.00 1,360,000.00 - - 1,651,784.80 12,500,000.00 - ORGANIC FERTILIZER PRODUCTION 2,720,000.00 2,720,000.00 CONSTRUCTION OF EVACUATION CENTER 1,600,000.00 1,600,000.00 CHT MOBILIZATION: TRAINING OF CHT MMEBERS (272 MEMBERS) AND NHTS-PR FAMILIES 1,186,560.00 1,186,560.00 HEALTH FACILITIES ENHANCEMENT PROGRAM: MEDICAL EQUIPMENT FOR 3IN1 UNIT 879,495.20 879,495.20 RABIES CONTROL PROGRAM: PROVISION OF CAT II & III BITES; TRAINING ON MANAGEMENT OF ANIMAL BITE VICTIMS; ORIENTATION OF STAFF 702,160.00 702,160.00 PROTECTIVE SERVICES: CONSTRUCTION OF DAY CARE CENTER 400,000.00 400,000.00 REPAIR OF DAY CARE CENTER 400,000.00 400,000.00 SLP: PRACTICAL SKILLS TRAINING FOR WOMEN AND OSY 800,000.00 800,000.00 SLP: MICRO-ENTERPRISE DEVELOPMENT (SEA-KAUNLARAN) 800,000.00 800,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS YAMAN PINOY: TALAVERA COOPERATIVES VEGETABLE MARKETING 800,000.00 800,000.00 OTOP STORE EXPRESS: TALAVERA PRODUCTS DISPLAY AND PASALUBONG CENTER 560,000.00 560,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,651,784.80 1,651,784.80 - 387 TALUGTUG 4,000,000.00 - - 500,000.00 4,070,000.00 - 730,000.00 - - 1,850,000.00 500,000.00 - - 850,000.00 12,500,000.00 IRRIGATION PROJECTS 1,300,000.00 1,300,000.00 POST-HARVEST FACILITIES AND EQUIPMENT 2,700,000.00 2,700,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION 500,000.00 500,000.00 SALINTUBIG 4,070,000.00 4,070,000.00 REPAIR AND HEALTH FACILITIES ENHANCEMENT 730,000.00 730,000.00 PROTECTIVE SERVICES CAPACITY BUILDING 500,000.00 500,000.00 PROTECTIVE SERVICES: SUPPORT TO DAY CARE CENTER 1,350,000.00 1,350,000.00 YAMAN PINOY 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION: 20 METERS FOOTBRIDGE (CONSTRUCTION AND RIPRAPPING) 850,000.00 850,000.00 388 ZARAGOZA 4,500,000.00 - - 2,880,000.00 1,200,000.00 - 920,000.00 - - 3,000,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 2,100,000.00 2,100,000.00 CONSTRUCTION OF 5 SITE-BOX CULVERT (DA-NIA) - AGRO-PROCESSING FACILITIES - PROCUREMENT OF POST-HARVEST FACILITIES (COMBINE HARVESTER TRESHER) - CONSTRUCTION OF SWIP 2,400,000.00 2,400,000.00 BASIC EDUCATION FACILITIES 1,760,000.00 1,760,000.00 GULAYAN SA PAARALAN 160,000.00 160,000.00 INNOVATIVE PROGRAMS 960,000.00 960,000.00 CONSTRUCTION OF CONNECTING BRIDGE 1,200,000.00 1,200,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 920,000.00 920,000.00 REHABILITATION OF DAY CARE CENTER 1,600,000.00 1,600,000.00 ECCD LEARNING MATERIALS 800,000.00 800,000.00 SUSTAINABLE LIVELIHOOD PROGRAMS 600,000.00 600,000.00 PROVINCE OF PAMPANGA 63,415,600.00 850,000.00 - 48,144,500.00 26,498,214.78 - 26,882,937.39 10,867,500.00 3,470,000.00 60,866,921.74 10,740,000.00 - 5,210,000.00 18,054,326.09 275,000,000.00 389 ANGELES CITY 3,650,000.00 - - - 1,105,000.00 - - 1,000,000.00 720,000.00 3,525,000.00 2,500,000.00 - - - 12,500,000.00 IRRIGATION PROJECT 700,000.00 700,000.00 VARIOUS DA PROJECTS 2,950,000.00 2,950,000.00 INFRA SUPPORT - 4 WHEEL TRACTOR W/ ACCESSORIES - POST HARVEST FACILITIES - ORGANIC FERTILIZER PRODUCTION - FARM IMPLEMENTS/TOOLS - EVACUATION FACILITY 1,105,000.00 1,105,000.00 DLIP-TULONG PANGKABUHAYAN PARA SA ATING MGA DISADVANTAGE WOMEN (TUPAD 1,000,000.00 1,000,000.00 MANPOWER SKILLS & TOURISM DEVELOPMENT 720,000.00 720,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 SKILLS TRAINING/JOB PLACEMENT 2,000,000.00 2,000,000.00 PROTECTIVE SERVICES CAPACITY BUILDING 525,000.00 525,000.00 YAMAN PINOY 1,000,000.00 1,000,000.00 YAMAN PINOY 1,500,000.00 1,500,000.00 390 APALIT 2,440,000.00 - - 3,240,000.00 - - 2,100,000.00 820,000.00 - 1,900,000.00 - - 2,000,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 2,440,000.00 2,440,000.00 1. MAKINA SA PAG-ANI PARA SA MAGSASAKA - 2. HANDTRACTOR WITH TRAILER - 3. APALIT FISHPORT (CONSIGNATION) - BUILDING REPARATION (GABALDON) 400,000.00 400,000.00 REPAIR & UPGRADING OF RPUS TYPE III BLDG. 1,500,000.00 1,500,000.00 REPAIR OF ROOFING 960,000.00 960,000.00 REPAIR OF CLASSROOM 380,000.00 380,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,100,000.00 2,100,000.00 DLIP: ENTREPRENEURSHIP DEVT. TRAINING FOR AMBULANT VENDORS 420,000.00 420,000.00 TUPAD 400,000.00 400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM MICROENTERPRISE DEVT TRACK 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES CAPACITY BUILDING 400,000.00 400,000.00 SKILLS TRAINING PROGRAM ON WELDING, ELECTRICAL WIRING INSTALLATION, CONSUMER ELECTRONICS, AUTOMOTIVE MECHANIC, BREAD AND PASTRY MAKING, COMMERCIAL COOKING & COMPUTER HARDWARE SERVICING 2,000,000.00 2,000,000.00 391 ARAYAT 3,000,000.00 - - 4,500,000.00 - - - 500,000.00 - 2,750,000.00 - - - 1,750,000.00 12,500,000.00 ORGANIC FERTILIZER MAKING FACILITY 3,000,000.00 3,000,000.00 REPAIR/REHABILITATION OF SCHOOL CLASSROOMS 4,500,000.00 4,500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP) 500,000.00 500,000.00 VARIOUS DILG PROJECTS 2,250,000.00 2,250,000.00 4. CONSTRUCTION OF DAY CARE CENTER - 5. CONSTRUCTION OF DROP-IN CENTER FOR CHILDREN IN CONFLICT WITH THE LAW - 6. REPAIR/UPGRADING OF 10 DAY CARE CENTERS - PROVISION OF ECCD LEARNING MATERIALS FOR DCCS AND SNPS 500,000.00 500,000.00 CONCRETING OF ROAD 1,750,000.00 1,750,000.00 392 BACOLOR 2,000,000.00 - - 1,191,000.00 2,400,000.00 - 1,109,000.00 - - 3,500,000.00 500,000.00 - - 1,800,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION 2,000,000.00 2,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 592,600.00 592,600.00 GULAYAN SA PAARALAN 598,400.00 598,400.00 CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 900,000.00 900,000.00 SOCIAL INFRASTRUCTURE & LOCAL CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,109,000.00 1,109,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE LIVELIHOOD PROGRAM 2,000,000.00 2,000,000.00 REPAIR/UPGRADING OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 CONTINOUS CAPABILITY BUILDING OF SOCIAL WORKERS AND OTHER STAKEHOLDERS IN MANAGEMENT OF DIFFERENT CASES 500,000.00 500,000.00 YAMAN PINOY 500,000.00 500,000.00 TO BE DETERMINED 300,000.00 300,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 REHABILITATION OF CONCRETE/ASPHALT ROAD 1,000,000.00 1,000,000.00 393 CANDABA - - - - - - - - - 6,500,000.00 - - - 6,000,000.00 12,500,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS (CONSTRUCTION OF DAY CARE CENTERS) 2,500,000.00 2,500,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS (REPAIR OF DAY CARE CENTERS) 4,000,000.00 4,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 6,000,000.00 6,000,000.00 394 FLORIDABLANCA 8,750,000.00 - - - - - 1,300,000.00 - - 1,500,000.00 950,000.00 - - - 12,500,000.00 IRRIGATION PROJECT (STW) 800,000.00 800,000.00 VARIOUS DA PROJECTS 7,950,000.00 7,950,000.00 2. COMBINED HARVESTER - 3. HAND TRACTOR - 4. MULTI-PURPOSE DRYING PAVEMENT - CONSTRUCTION OF BARANGAY HEALTH STATIONS 1,300,000.00 1,300,000.00 SUSTAINABLE LIVELIHOOD MICROENTERPRISE DEVELOPMENT TRACK 1,500,000.00 1,500,000.00 SKILLS TRAINING (YAMAN PINOY) 950,000.00 950,000.00 395 GUAGUA 3,051,500.00 - - 1,020,000.00 1,044,380.00 - 2,488,120.00 850,000.00 - 3,196,000.00 - - - 850,000.00 12,500,000.00 IRRIGATION PROJECTS (SHALLOWTUBE WELLS) 501,500.00 501,500.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE 2,550,000.00 2,550,000.00 BASIC EDUCATION FACILITIES (REPAIR/REHABILITATION OF CLASSROOMS & PROVISION OF SCHOOL FURNITURES) 1,020,000.00 1,020,000.00 VARIOUS DILG PROJECTS 1,044,380.00 1,044,380.00 1. REHABILITATION/IMPROVEMENT OF DRAINAGE SYSTEM - 3. REHABILITATION/IMPROVEMENT OF DRAINAGE CANAL & OUTLET AT SAN JOSE - 4. REHABILITATION OF LAMBAC MULTI-PURPOSE BUILDING (EVACUATION FACILITY) (2ND FLOOR AREA) BRGY. LAMBAC - 5. RESCUE EQUIPMENT (PROCUREMENT OF TOOLS & EQUIPMENT FOR DISASTER REDUCTION & REHABILITATION ACTIVITIES) - CONDUCT OF TRAININGS SEMINARS-WORKSHOP DRILLS/ORIENTATION-INFO DESSIMANTION/INSPECTION CAMPAIGN IN CONNECTION WITH DISASTER RISK REDUCTION PROGRAM - COMMUNITY HEALTH TEAM MOBILIZATION,DOH-11 RNHEALS 510,000.00 510,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,978,120.00 1,978,120.00 DOLE INTEGRATED LIVELIHOOD PROGRAM (DLIP); WORKERS INCOME AUGMENTATION PROGRAM (WIN-AP) 850,000.00 850,000.00 ROTECTIVE SERVICES INFRASTRUCTURE PROJECTS FOR DAY CARE CENTERS, MENTALLY III PERSON 2,133,500.00 2,133,500.00 PROTECTIVE SERVICES CAPACITY BUILDING 501,500.00 501,500.00 SUSTAINABLE LIVELIHOOD PROGRAM A. MICROENTERPRISE DEVELOPMENT TRACK B. EMPLOYMENT FACILITATION TRACK 561,000.00 561,000.00 UPGRADING/IMPROVEMENT OF ROAD AT SAN PEDRO-SAN PABLO (PNR) 850,000.00 850,000.00 396 LUBAO 5,000,000.00 - - - 3,000,000.00 - - 3,500,000.00 - 1,000,000.00 - - - - 12,500,000.00 CONSTRUCTION OF TRADING POST (BAGSAKAN NG BAYAN) 5,000,000.00 5,000,000.00 CONSTRUCTION OF EVACUATION CENTER 3,000,000.00 3,000,000.00 TULONG PANG HANAP BUHAY PARA SA ATING MGA DISADVANTAGE WORKERS (TUPAD) 3,500,000.00 3,500,000.00 CONSTRUCTION/REPAIR/REHABILITATION OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 397 MABALACAT 3,900,000.00 - - 3,050,000.00 - - 1,500,000.00 - 1,400,000.00 2,050,000.00 600,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,150,000.00 1,150,000.00 7. FARM IMPLEMENTS/FARM TOOLS - 8. PURCHASE OF COMBINED HARVESTER/TRESHER - AGRI-FISHERY TRAINING WITH COMPLETE PACKAGE OF TECHNOLOGY 600,000.00 600,000.00 IRRIGATION PROJECTS 1,450,000.00 1,450,000.00 GOAT DISPERSAL 700,000.00 700,000.00 ALTERNATIVE LEARNING SYSTEM (ALS) 2,000,000.00 2,000,000.00 ALTERNATIVE LEARNING SYSTEM FOR DIFFERENTLY-ABLED PERSONS 450,000.00 450,000.00 GULAYAN SA PAARALAN 600,000.00 600,000.00 CONSTRUCTION OF 2 BARANGAY HEALTH CENTERS 1,500,000.00 1,500,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 1,400,000.00 1,400,000.00 VARIOUS KC PROJECTS 2,050,000.00 2,050,000.00 1. CONSTRUCTION OF 2 DAY CARE CENTERS - 2. CONSTRUCTION OF DROP-IN CENTER WITH FENCE - TRAINING ON SEWING FOR GARMENTS MANUFACTURING YAMAN PINOY 600,000.00 600,000.00 398 MACABEBE 500,000.00 - - 2,780,000.00 616,000.00 - 4,104,000.00 1,000,000.00 500,000.00 2,500,000.00 - - - 500,000.00 12,500,000.00 AGRI-FISHERY TRAINING 500,000.00 500,000.00 SPECIAL PROGRAM FOR CHILDREN WITH SPECIAL NEEDS AND ALS 500,000.00 500,000.00 GULAYAN SA PAARALAN 280,000.00 280,000.00 REPAIR/UPGRADING OF SCHOOL BUILDINGS 2,000,000.00 2,000,000.00 CONSTRUCTION OF DRAINAGE SYSTEMS 616,000.00 616,000.00 REPAIR OF BIRTHING FACILITIES 2,000,000.00 2,000,000.00 RABIES ELIMINATION 500,000.00 500,000.00 STD/HIV AND AIDS PREVENTION 528,000.00 528,000.00 RN HEALS 576,000.00 576,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS RHU MIDWIFE PLACEMENT PROGRAM 500,000.00 500,000.00 TULONG PANGKABUHAYAN PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 ADJUSTMENT MEASURES PROGRAM 500,000.00 500,000.00 ECO-TOURISM DEVELOPMENT PROJECT AND CAPABILITY TRAINING 500,000.00 500,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS 500,000.00 500,000.00 PROVISION OF LEARNING MATERIALS FOR DCCS AND SUPERVISED NEIGHBORHOOD PLAY GROUPS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION/REPAIR OF DAYCARE CENTER 1,000,000.00 1,000,000.00 UPGRADING AND CONCRETING OF ROADS 500,000.00 500,000.00 399 MAGALANG 4,600,000.00 - - 3,500,000.00 1,000,000.00 - - - - 1,000,000.00 1,000,000.00 - 500,000.00 900,000.00 12,500,000.00 ORGANIC FERTLIZER PRODUCTION 800,000.00 800,000.00 SIP + STW 1,000,000.00 1,000,000.00 VARIOUS DA PROJECTS 2,800,000.00 2,800,000.00 3. 4 WHEEL TRACTOR - 4. FLATBED DRYER AND MPDP - 6. TRAMLINES - REHABILITATION OF CLASSROOMS 3,500,000.00 3,500,000.00 CONSTRUCTION OF SLOPE PROTECTION 1,000,000.00 1,000,000.00 CONSTRUCTION OF WOMEN CRISIS BLDG. 1,000,000.00 1,000,000.00 YAMAN PINOY (VEG. NOODLES) 500,000.00 500,000.00 SHARED SERVICES FACILITY 500,000.00 500,000.00 REHABILITATION OF ROADS 900,000.00 900,000.00 TESDA TRAININGS 500,000.00 500,000.00 400 MASANTOL 2,550,000.00 - - 1,283,500.00 1,130,434.78 - 1,565,217.39 - - 2,956,521.74 - - 2,210,000.00 804,326.09 12,500,000.00 FISHERFOLK'S ASSISTANCE 2,550,000.00 2,550,000.00 BASIC EDUCATION FACILITIES 1,062,500.00 1,062,500.00 GULAYAN SA PAARALAN 221,000.00 221,000.00 RESCUE BOATS IN ALL BARANGAYS 1,130,434.78 1,130,434.78 COMMUNITY HEALTH CENTER 1,565,217.39 1,565,217.39 PROVISION OF 30 UNIT CORE SHELTERS 1,826,086.96 1,826,086.96 LIVELIHOOD PROGRAMS 1,130,434.78 1,130,434.78 TO BE DETERMINED 804,326.09 804,326.09 TRAINING AND SKILLS PROGRAM 1,530,000.00 1,530,000.00 WELDING, BAR TRENDING, COMMERCIAL COOKING, CONSUMER ELECTRONICS 680,000.00 680,000.00 401 MEXICO 4,300,000.00 - - 2,500,000.00 - - 500,000.00 - - 3,500,000.00 1,200,000.00 - 500,000.00 - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,000,000.00 1,000,000.00 IRRIGATION PROJECTS 2,800,000.00 2,800,000.00 FACILITIES; REPAIR/REHABILITATION OF CLASSROOMS 1,610,000.00 1,610,000.00 GULAYAN SA PAARALAN 390,000.00 390,000.00 NON-FORMAL SCHOOLING ABOT-ALAM PROGRAM 500,000.00 500,000.00 COMMUNITY HEALTH TEAMS (CHT) MOBILIZATION 500,000.00 500,000.00 PROTECTIVE SERVICES CAPABILITY BUILDING 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO ENTERPRISE DEVELOPMENT TRACK 3,000,000.00 3,000,000.00 YAMAN PINOY 700,000.00 700,000.00 SHARED SERVICE FACILITY (SSF) 500,000.00 500,000.00 COMMUNITY BASED TRAINING 500,000.00 500,000.00 402 MINALIN 1,000,000.00 - - 500,000.00 4,980,000.00 - - - - 1,970,000.00 1,000,000.00 - - 3,050,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 CONDUCT OF SKILLS TRAINING FOR OUT OF SCHOOL YOUTH 500,000.00 500,000.00 VARIOUS DILG PROJECTS 4,980,000.00 4,980,000.00 5. CONSTRUCTION OF CANALS - 6. PURCHASE OF RESCUE EQUIPMENT - TULAY NG PANGULO - CONSTRUCTION OF DAY CARE CENTER 970,000.00 970,000.00 REHABILITATION OF DAY CARE CENTER BUILDING 500,000.00 500,000.00 REHABILITATION OF DAY CARE CENTER BUILDING 500,000.00 500,000.00 YAMAN PINOY 1,000,000.00 1,000,000.00 REPAIR/REHABILITATION OF BARANGAY ROAD 1,550,000.00 1,550,000.00 REPAIR/REHABILITATION OF BARANGAY ROAD 1,500,000.00 1,500,000.00 403 PORAC 3,181,900.00 - - 2,300,000.00 - - 1,015,600.00 1,347,500.00 - 4,100,000.00 555,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 3,181,900.00 3,181,900.00 1. INFRASTRUCTURE SUPPORT TO AGRICULTURE - 2. INFRASTRUCTURE SUPPORT TO AGRICULTURE - 3. ORGANIC FERTILIZER PRODUCTION - REPAIR/REHABILITATION OF CLASSROOM BUILDINGS 2,000,000.00 2,000,000.00 IMPROVEMENT OF THE QUALITY OF THE ALTERNATIVE LEARNING SYSTEM 300,000.00 300,000.00 HEALTH EMERGENCY MANAGEMENT 510,000.00 510,000.00 TUBERCOLOSIS CONTROL PROGRAM 505,600.00 505,600.00 DLIP: KABUHAYAN STARTER KIT PROGRAM ( BARBER & HAIR 500,000.00 500,000.00 EXPANSION OF OUT OF SCHOOL YOUTH RECIPIENT ON EXISTING SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENTS 847,500.00 847,500.00 CONSTRUCTION OF 5 DAY CARE CENTER 4,100,000.00 4,100,000.00 SHARED SERVICE FACILITIES 300,000.00 300,000.00 PRODUCT DEVELOPMENT ENHANCEMENT (PEANUT) AND 5. INDUSTRY CLUSTERING DEV'T PROGRAM SERVICE FACILITY (ATCHARA PRODUCTION) 255,000.00 255,000.00 404 SAN FERNANDO CITY 1,100,000.00 - - - 2,500,000.00 - 1,850,000.00 1,000,000.00 - 5,050,000.00 1,000,000.00 - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (FARM MACHINERIES OR FARM MECHANIZATION PROGRAM 600,000.00 600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE AGRI-FISHERIES BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS (ANIMAL LOAN PROGRAM 500,000.00 500,000.00 RESCUE EQUIPMENT 2,500,000.00 2,500,000.00 INFECTIOUS DISEASES 1,850,000.00 1,850,000.00 TULONG PANGHANAPBUHAY PARA SA DISADVANTAGED 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS 3,550,000.00 3,550,000.00 OTOP STORE EXPRESS 500,000.00 500,000.00 YAMAN PINOY 500,000.00 500,000.00 405 SAN LUIS 1,275,000.00 - - 4,080,000.00 3,695,000.00 - - 425,000.00 850,000.00 850,000.00 425,000.00 - - 900,000.00 12,500,000.00 IRRIGATION PROJECT 850,000.00 850,000.00 POST HARVEST FACILITIES AND EQUIPMENT 425,000.00 425,000.00 REHABILITATION/UPGRADING/IMPROVEMENT OF 12 UNITS CLASSROOMS 3,060,000.00 3,060,000.00 REHABILITATION OF 2 CLASSROOM 425,000.00 425,000.00 UPGRADING/ELEVATING OF 3 CLASSROOMS 595,000.00 595,000.00 FLOOD CONTROL 3,695,000.00 3,695,000.00 AUGMENTATION PROGRAM (WINAP) (FESLU/TODA MERCHANDIZING) 425,000.00 425,000.00 TOURISM DEVELOPMENT PROJECT FREEDOM PARK 425,000.00 425,000.00 TOURISM DEVELOPMENT PROJECT 425,000.00 425,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS 850,000.00 850,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) 425,000.00 425,000.00 CONCRETING OF ROAD 900,000.00 900,000.00 406 SAN SIMON 1,190,000.00 850,000.00 - 3,230,000.00 595,000.00 - 2,550,000.00 425,000.00 - 3,150,000.00 510,000.00 - - - 12,500,000.00 CONSTRUCTIONM OF IRRIGATION FACILITY 850,000.00 850,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION 680,000.00 680,000.00 CONDUCT OF AGRI-FISHERY TRAININGS AND PROVISIONS OF AGRI- FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS 510,000.00 510,000.00 REPAIR AND REHABILITATION OF PUBLIC ELEMENTARY SCHOOLS CLASSROOMS 1,700,000.00 1,700,000.00 PROVISION OF CLASSROOMS FACILITIES (1,400 SEATS) 680,000.00 680,000.00 ABOT-ALAM PROGRAM & ALS INFED TRAININGS 850,000.00 850,000.00 PROVISION OF CAPACITY BUILDING FOR CSOS 595,000.00 595,000.00 CONDUCT NATIONAL TUBERCOLOSIS PROGRAM A. ADVOCACY B. TRAINING C. PROCUREMENT 850,000.00 850,000.00 CONSTRUCTION OF BARANGAY HEALTH STATIONS 1,700,000.00 1,700,000.00 INTEGRATED LIVELIHOOD PROGRAM:TUPAD 425,000.00 425,000.00 VARIOUS DSWD PROJECTS 2,087,500.00 2,087,500.00 14. REPAIR/UPGRADING OF DAY CARE CENTERS - 15. ESTABLISHMENT/PROVISION OF WOMEN CRISIS CENTER - 16. UPGRADING OF EVACUATION CENTER - PROVISION OF CAPABILITY BUILDING TO SOCIAL WORKERS AND ECCD LEARNING MATERIALS FOR DCCS 467,500.00 467,500.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-EMPLOYMENT FACILITATION TRACK 595,000.00 595,000.00 YAMAN PINOY: PROVISION OF A COMMUNITY LEVEL CAPABILITY/LIVELIHOOD PROGRAM TO PROMOTE ENTREPRENUERSHIP 510,000.00 510,000.00 407 SANTA ANA 3,224,600.00 - - 3,330,000.00 1,005,400.00 - 1,365,000.00 - - 2,075,000.00 - - - 1,500,000.00 12,500,000.00 (SILCAB) INSTITUTIONAL DEVELOPMENT INTERVENTIONS 455,000.00 455,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 509,600.00 509,600.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,350,000.00 1,350,000.00 ORGANIC FERTILIZER PRODUCTION 910,000.00 910,000.00 BASIC EDUCATION FACILITIES, REPAIR/REHABILITATION OF CLASSROOMS PROVISION OF SCHOOL FURNITURE 3,330,000.00 3,330,000.00 VARIOUS DILG PROJECTS 1,005,400.00 1,005,400.00 8. EVACUATION FACILITY - 9. RESCUE EQUIPMENT - 10. FLOOD CONTROL - MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION 455,000.00 455,000.00 HEALTH EMERGENCY MANAGEMENT 455,000.00 455,000.00 TB CONTROL 455,000.00 455,000.00 PROTECTIVE SERVICES CAPACITY BUILDING 455,000.00 455,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,620,000.00 1,620,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 464,000.00 464,000.00 CORE LOCAL ROAD CONSTRUCTION 1,036,000.00 1,036,000.00 408 SANTA RITA 4,260,000.00 - - 2,840,000.00 - - 1,200,000.00 - - 4,200,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 3,390,000.00 3,390,000.00 ORGANIC FERTILIZER PRODUCTION 800,000.00 800,000.00 FARM IMPLEMENTS/TOOLS 70,000.00 70,000.00 BASIC EDUCATION FACILITIES; REPAIR/REHAB OF CLASSROOMS, PROVISION OF SCHOOL FURNITURE 2,250,000.00 2,250,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN 90,000.00 90,000.00 RNHEALS RURAL AND HEALTH MIDWIFE PLACEMENT PROGRAM 700,000.00 700,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 500,000.00 500,000.00 PROTECTIVE SERVICES (CAPACITY BUILDING); BUILDING OF DCW, PROVISIONS OF ECCD LEARNING MATERIALS FOR DCC, FEEDING PROGRAM OUTSIDE THE DCC 1,900,000.00 1,900,000.00 PROTECTIVE SERVICES (INFRA); REPAIR/UPGRADING OF DAY CARE CENTERS 800,000.00 800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 409 SANTO TOMAS 2,200,000.00 - - 5,600,000.00 2,915,000.00 - 1,785,000.00 - - - - - - - 12,500,000.00 IRRIGATION PROJECT 1,200,000.00 1,200,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFRASTRUCTURE SUPPORT TO AGRI & FISHERY PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 POST HARVEST FACILITIES AND EQUIPMENT 500,000.00 500,000.00 REPAIR/REHABILITATION OF SCHOOL BUILDINGS 3,400,000.00 3,400,000.00 REPAIR/UPGRADING OF 11 DAY CARE CENTERS 2,200,000.00 2,200,000.00 PROVISION OF POTABLE WATER SUPPLY 1,200,000.00 1,200,000.00 CONSTRUCTION OF CANALS 1,715,000.00 1,715,000.00 ELEVATION OF BARANGAY HEALTH STATIONS 1,785,000.00 1,785,000.00 410 SASMUAN 2,242,600.00 - - 3,200,000.00 512,000.00 - 2,451,000.00 - - 3,594,400.00 500,000.00 - - - 12,500,000.00 VARIOUS BFAR PROJECTS 600,000.00 600,000.00 9. INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT THROUGH THE PROVISION OF FISHING BOATS AND NETS - 10. FISHERY-PROCESSING FACILITIES & EXPANDED FISHERY BUSINESS ACTIVITIES - IMPROVEMENT OF TRADING POSTS 942,600.00 942,600.00 VARIOUS BFAR PROJECTS 700,000.00 700,000.00 12. PROVISION OF SUSTAINABLE FISHERY BASED LIVELIHOOD BUSINESS INVESTMENTS - 13. MAINTENANCE/PROTECTION OF FISH SANCTUARY - REPAIR/REHABILITATION OF CLASSROOMS 2,700,000.00 2,700,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESSED EDUCATION/ABOT ALAM PROGRAM 500,000.00 500,000.00 PROVISION OF POTABLE WATER 512,000.00 512,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,597,900.00 1,597,900.00 RABIES ELIMINATION 373,100.00 373,100.00 RN HEALS & RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 480,000.00 480,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT 894,400.00 894,400.00 PROTECTIVE SERVICES CAPACITY BUILDING 450,000.00 450,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,250,000.00 2,250,000.00 ENTREPRENEURAL TRAINING, SKILLS AND INDUSTRY FOCUS TRAINING, PRODUCT DEVELOPMENT 500,000.00 500,000.00 PROVINCE OF TARLAC 62,460,781.00 5,950,000.00 1,470,000.00 39,861,274.00 46,206,025.00 - 21,522,059.00 3,120,000.00 500,000.00 31,314,861.00 4,700,000.00 - 1,000,000.00 11,895,000.00 230,000,000.00 411 ANAO 1,500,000.00 2,050,000.00 - 1,070,000.00 2,361,100.00 - 2,838,900.00 380,000.00 - 1,500,000.00 800,000.00 - - - 12,500,000.00 IRRIGATION 2,050,000.00 2,050,000.00 ORGANIC FERTILIZER PRODUCTION (VERMI) 1,500,000.00 1,500,000.00 GULAYAN KADA PAARALAN 70,000.00 70,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION/ ABOT ALAM PROGRAM 500,000.00 500,000.00 BASIC EDUCATION FACILITIES-PROVISION OF SCHOOL FURNITURE 500,000.00 500,000.00 REHABILITATION/EXPANSION/UPGRADING OF LEVEL III WATER SYSTEM 2,361,100.00 2,361,100.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,152,000.00 1,152,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-PURCHASE OF BASIC EQUIPMENT AND INSTRUMENTS 936,900.00 936,900.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-UPGRADING OF TB- DOTS CENTER 500,000.00 500,000.00 PURCHASE OF ANTIRABIES VACCINE 250,000.00 250,000.00 ENTREPRENEURIAL TRAININGS 380,000.00 380,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES : CAPACITY BLDG. 500,000.00 500,000.00 YAMAN PINOY (YLANG-YLANG) 800,000.00 800,000.00 412 BAMBAN 2,700,000.00 - 970,000.00 2,900,000.00 - - - 640,000.00 - 600,000.00 - - - 4,690,000.00 12,500,000.00 POST HARVEST FACILITIES & EQUIPMENT (MPDP) 1,440,000.00 1,440,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE (RICE THRESHER & CORN SHELLER) 1,260,000.00 1,260,000.00 NATIONAL GREENING PROGRAM 970,000.00 970,000.00 BASIC EDUCATION FACILITIES AND REHABILITATION OF CLASSROOMS 2,900,000.00 2,900,000.00 DLIP - DOLE LIVELIHOOD INTEGRATED PROGRAM 640,000.00 640,000.00 SLP (MICROENTERPRISE DEVELOPMENT TRACK) 600,000.00 600,000.00 CORE LOCAL ROAD CONSTRUCTION (MAINTENANCE/REHABILITATION) 4,690,000.00 4,690,000.00 413 CAMILING 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 IRRIGATION PROJECTS (OSP) 2,000,000.00 2,000,000.00 VARIOUS DA PROJECTS 10,500,000.00 10,500,000.00 MECHANICAL DRYERS (FLAT BED) - ORGANIC FERTILIZER PRODUCTION - 414 CAPAS 760,000.00 - - 2,500,000.00 - - 5,490,440.00 1,600,000.00 - 2,149,560.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 760,000.00 760,000.00 BASIC EDUCATION FACILITIES 2,500,000.00 2,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 3,888,000.00 3,888,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,602,440.00 1,602,440.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP) 1,600,000.00 1,600,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 2,149,560.00 2,149,560.00 415 CONCEPCION 4,207,000.00 - - 2,500,000.00 - - 3,793,000.00 - - 2,000,000.00 - - - - 12,500,000.00 EXPANDED AGRIBUSINESS 4,207,000.00 4,207,000.00 REPAIR/REHABILITATION OF CLASSROOMS 2,500,000.00 2,500,000.00 CHT MOBILIZATION 625,000.00 625,000.00 HFEP 3,168,000.00 3,168,000.00 SUSTAINABLE LIVELIHOOD SLP 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES CAPACITY BUILDING 1,000,000.00 1,000,000.00 416 GERONA 2,600,000.00 - - 1,536,575.00 1,879,425.00 - 684,000.00 - - 5,100,000.00 700,000.00 - - - 12,500,000.00 IRRIGATION PROJECT (STW& OSP) 1,000,000.00 1,000,000.00 POST-HARVEST FACILITY AND EQUIPMENT (MPDP) 1,600,000.00 1,600,000.00 BASIC EDUCATION FACILITIES 1,228,915.00 1,228,915.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ ABOT ALAM PROGRAM 307,660.00 307,660.00 SALINTUBIG (DEEP WELL LEVEL 2 DISTRIBUTION LINES) 1,879,425.00 1,879,425.00 RABIES ELIMINATION (CAT II) 336,000.00 336,000.00 RABIES ELIMINATION (CAT III) 348,000.00 348,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS CONSTRUCTION OF DAY CARE CENTER 1,900,000.00 1,900,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING 3,200,000.00 3,200,000.00 YAMAN PINOY 700,000.00 700,000.00 417 LA PAZ 5,064,000.00 - - 210,000.00 1,976,000.00 - 250,000.00 500,000.00 - 2,000,000.00 - - - 2,500,000.00 12,500,000.00 IRRIGATION PROJECTS (SIP) 5,064,000.00 5,064,000.00 GULAYAN SA PAARALAN 210,000.00 210,000.00 EXPANSION OF WATER SUPPLY SYSTEM 1,976,000.00 1,976,000.00 RABIES ELIMINATION 250,000.00 250,000.00 TUPAD 500,000.00 500,000.00 REPAIR & UPGRADING OF DAYCARE CENTERS 2,000,000.00 2,000,000.00 CONSTRUCTION OF CONCRETE ROAD 2,500,000.00 2,500,000.00 418 MAYANTOC 3,373,500.00 2,400,000.00 - 1,743,000.00 1,483,500.00 - - - - 3,500,000.00 - - - - 12,500,000.00 IRRIGATION PROJECT ( REHABILITATION OF COMMUNAL IRRIGATION SYSTEM (CIS) ) 2,400,000.00 2,400,000.00 POST HARVEST FACILITIES ( CONSTRUCTION OF MULTI- PURPOSE DRYING PAVEMENT (MPDP)) 3,373,500.00 3,373,500.00 BASIC EDUCATION FACILITIES (REPAIR /REHABILITATION OF CLASSROOMS @ 10 ELEMENTARY AND PRIMARY SCHOOL @ P100,00.00 EACH SCHOOL) 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITES (ACQUISITION/PROVISION OF 990 PCS. OF ARMCHAIR(SEATS) @ P700.00 EACH 693,000.00 693,000.00 GULAYAN SA PAARALAN (ESTABLISHMENT OF PLAN NURSERY, BIO- INTENSIVE GARDENING OTHER RELATED ACTIVITIES AT FIVE (5 ) SELECTED ELEM./PRIMARY SCHOOLS) 50,000.00 50,000.00 SALIN TUBIG (CONSTRUCTION OF ONE (1) UNIT GROUND WATER DEEP WELL -LEVEL 1) 20 METERS DEEP @ P315,000.00 283,500.00 283,500.00 FLOOD CONTROL ( GROUTED RIPPRAPING @ P 500,000.00 PER BARANGAY) 1,200,000.00 1,200,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS ( CONSTRUCTION OF DAY CARE CENTER) 800,000.00 800,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS ( REPAIR/UPGRADING OF DAY CARE CENTERS @ P300,000.00/CENTER) 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (PROVISION OF CAPITAL ASSISTANCE THRU "SOFT LOAN" @ P5,000.00 EACH BENEFICIARIES) 1,200,000.00 1,200,000.00 419 MONCADA 6,400,631.00 - - - 4,000,000.00 - 1,099,369.00 - - - 1,000,000.00 - - - 12,500,000.00 1 UNIT TRACTOR (90HP) 2,300,631.00 2,300,631.00 2 UNITS HARVESTER 3,000,000.00 3,000,000.00 ORGANIC FERTILIZER PRODUCTION (25 HP ELECTRIC SHREDDER WITH PLASTIC PULVERIZER, HORIZONTAL MIXER, OSCILLATING SCREEN WITH BELT CONVEYOR, INNOVATED HAMMERMILL) 1,100,000.00 1,100,000.00 RESCUE EQUIPMENT (2 UNITS DUMP TRUCKS , 1 UNIT GRADER , 1 UNIT BACKHOE LOADER 4,000,000.00 4,000,000.00 OPB, MCP & TB DOTS (3 IN 1) 1,099,369.00 1,099,369.00 OTOP STORE EXPRESS (PASALUBONG CENTER) 1,000,000.00 1,000,000.00 420 PANIQUI 2,000,000.00 - - 5,121,699.00 500,000.00 - - - - 3,378,301.00 1,500,000.00 - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (PROVISION OF SMALL TRACTORS TO AUGMENT FARMING METHODS) 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES (REHABILITATION OF HOME ECONOMICS ROOM OF BURGOS ELEMENTARY SCHOOL, PANIQUI SOUTH DISTRICT) 580,505.27 580,505.27 BASIC EDUCATION FACILITIES (REPAIR OF ROOFING & CEILING OF 6 CLASSROOMS OF DEL VALLE ELEMENTARY SCHOOL, PANIQUI NORTH DISTRICT) 601,862.00 601,862.00 BASIC EDUCATION FACILITY (REHABILITATION OF TWO (2) CLAASSROOMS AND ONE (1) INDUSTRIAL ARTS ROOM OF ABOGADO ELEMENTARY SCHOOL, PANIQUI NORTH DISTRICT ) 549,522.48 549,522.48 BASIC EDUCATION FACILITIES (REPAIR OF FOURTEEN (14) CLASSROOMS OF BARANGAY NANCAMARINAN ELEMENTARY SCHOOL, PANIQUI NORTH DISTRICT) 2,804,710.70 2,804,710.70 BASIC EDUCATION FACILITIES (REPAIR OF CLASSROOMS OF CAYANGA ELEMENTARY SCHOOL, PANIQUI SOUTH DISTRICT) 585,098.55 585,098.55 CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM-MICRO ENTERPRISE DEVELOPMENT TRACK (WATERLILY HANDICRAFTS PRODUCTION AND OTHER SUSTAINABLE LIVELIHOOD PROGRAMS) 2,128,301.00 2,128,301.00 SUSTAINABLE LIVELIHOOD PROGRAM-MICRO ENTERPRISE DEVELOPMENT TRACK (HI-SPEED SEWING MACHINE FOR PERSON WITH DISABILITIES) 1,250,000.00 1,250,000.00 ICDP: BAMBOO PROCESSING 1,500,000.00 1,500,000.00 421 PURA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 EXPANSION OF PURA WATER SYSTEM 12,500,000.00 12,500,000.00 422 RAMOS 2,000,000.00 - - 2,500,000.00 3,000,000.00 - - - - 3,500,000.00 - - - 1,500,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE (PURCHASE OF HARVESTER /THRESHER AND TRACTOR) 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES (REPAIR/REHABILIZATION OF CLASSROOM) 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES (PROVISION OF SCHOOL FURNITURE) 500,000.00 500,000.00 FLOOD CONTROL ( CONSTRUCTION OF CANALS/DRAINAGE SYSTEM) 3,000,000.00 3,000,000.00 PROTECTIVE SERVICES-INFRASTRACTURE PROJECTS (CONSTRUCTION OF DAY CARE CENTER) 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK ( NEGO KART AND SARI-SARI STORE NEGOSYO PROGRAM) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) EMPLOYMENT FACILITATION TRACK ( BEAUTY CULTURE (HAIR, NAIL, WAXING AND MAKE-UP SERVICES) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORE LOCAL ROAD CONSTRUCTION (CONSTRUCTION OF ROAD) 1,500,000.00 1,500,000.00 423 SAN CLEMENTE 2,005,000.00 - - 4,350,000.00 4,216,000.00 - 929,000.00 - - 500,000.00 500,000.00 - - - 12,500,000.00 IRRIGATION PROJECTS(STW) 1,000,000.00 1,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND ASGRI- FISHERY BUSINESS INVESTMENT 505,000.00 505,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 500,000.00 500,000.00 REPAIR/REHAB OF CLASSROOMS 3,600,000.00 3,600,000.00 GULAYAN SA PAARALAN 150,000.00 150,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION/TECHNICAL VOCATIONAL TRAININGS BY TESDA 600,000.00 600,000.00 SALINTUBIG 2,216,000.00 2,216,000.00 FLOOD CONTROL (CONSTRUCTION OF PROTECTIVE DIKES) 2,000,000.00 2,000,000.00 REPAIR OF BRGY. HEALTH STATIONS 929,000.00 929,000.00 PROTECTIVE SERVICE-CAPACITY BUILDING 500,000.00 500,000.00 SHARED SERVICE FACILITY 500,000.00 500,000.00 424 SAN JOSE 4,600,000.00 - - 1,800,000.00 2,990,000.00 - 500,000.00 - - - - - - 2,610,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,200,000.00 1,200,000.00 ARC CONNECTIVITY & ECONOMIC SUPPORT SERVICES (ARCCESS) - INFRASTRUCTURE SUPPORT TO AGRICULTURE (ACQUISITION OF HARVESTER) - IRRIGATION PROJECTS (CONST. SMALL FARM RESERVIOR (SFR) 1,000,000.00 1,000,000.00 POST-HARVEST FACILITIES AND EQUIPMENT (FLAT BED DRYERS) 1,400,000.00 1,400,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES ( MILKING CARABAO) 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES:-REPAIR / REHABILITATION OF CLASSROOMS 900,000.00 900,000.00 BASIC EDUCATION FACILITIES(PROVISION OF SCHOOL ARM CHAIRS) 900,000.00 900,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 990,000.00 990,000.00 FLOOD CONTROL - CONCRETE RIVETMENT 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (TB DOTS PACKAGES) 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 600,000.00 600,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 2,010,000.00 2,010,000.00 425 SAN MANUEL - - - - 11,300,000.00 - - - - - 200,000.00 - 1,000,000.00 - 12,500,000.00 SALINTUBIG (DEEPWELL LEVEL 3 DISTRIBUTION LINES) 8,300,000.00 8,300,000.00 CONSTRUCTION OF COMMERCIAL STALLS 3,000,000.00 3,000,000.00 YAMAN PINOY 200,000.00 200,000.00 SKILLS AND LIVELIHOOD TRAININGS 1,000,000.00 1,000,000.00 426 SANTA IGNACIA 2,800,000.00 1,500,000.00 - 2,000,000.00 - - 2,500,000.00 - - 3,700,000.00 - - - - 12,500,000.00 IRRIGATION PROJETCS (REHABILITATION OF IRRIGATION CANALS) 1,500,000.00 1,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT(MINI TRACTOR -20HP) 1,000,000.00 1,000,000.00 POST HARVEST FACILITIES AND EQUIPMENTS (MECHANICAL DRYERS) 1,800,000.00 1,800,000.00 BASIC EDUCATION FACILITIES (REPAIR AND REHABILITATION OF IDENTIFIED ELEMENTARY AND HIGH SCHOOL) 1,300,000.00 1,300,000.00 BASIC EDUCATION FACILITIES (PROVISION OF SCHOOL FURNITURES) 700,000.00 700,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 INFECTIOUS DISEASES (RABIES ELIMINATION) 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (REPAIR AND UPGRADING OF DAY CARE CENTERS) 1,300,000.00 1,300,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICROENTERPRISE DEVELOPMENT TRACT) 2,400,000.00 2,400,000.00 427 TARLAC CITY 5,350,650.00 - 500,000.00 6,180,000.00 - - 3,437,350.00 - - 2,032,000.00 - - - - 17,500,000.00 VARIOUS DA PROJECTS 1,190,650.00 1,190,650.00 POST-HARVEST FACILITY - INFRASTRUCTURE SUPPORT TO AGRICULTURE (RICE REAPER) - ORGANIC FERTILIZER PRODUCTION (VERMI COMPOSTING) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD - TINAPA -MAKING 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD-PACKING MACHINE AND PACKING MATERIALS 500,000.00 500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES (VEGGIE NOODLE MAKING) 1,000,000.00 1,000,000.00 IRRIGATION PROJECTS/STW 2,160,000.00 2,160,000.00 NATIONAL GREENING PROGRAM (WATERSHED ADOPTATION ALONG THE UPSTREAM AREA WITHIN THE BENIG RIVER WITH TREE PLANTING) 500,000.00 500,000.00 REPAIR/REHABILITATION OF CLASSROOMS OF DIFFERENT SCHOOLS, CITY OF TARLAC 4,000,000.00 4,000,000.00 PURCHASE OF SCHOOL FURNITURES (ARMCHAIR) 1,680,000.00 1,680,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (REPAIR OF BARANGAY HEALTH STATION) 887,350.00 887,350.00 RABIES ELIMINATION -PREVENTION AND CONTROL OF HUMAN RABIES THROUGH PROVISION OF POST EXPOSURE PROPHYLAREGION XIS (PEP)A. CATEGORY II BITES 850,000.00 850,000.00 RABIES ELIMINATION -PREVENTION AND CONTROL OF HUMAN RABIES THROUGH PROVISION OF POST EXPOSURE PROPHYLAREGION XIS (PEP)B. CATEGORY III BITES 1,700,000.00 1,700,000.00 PROTECTIVE SERVICES - A. INFRASTRUCTURE PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND FLOURIDE GEL TOOTHPASTE) 525,000.00 525,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE LIVELIHOOD PROGRAM (EMPLOYMENT TRACK FACILITATION) 507,000.00 507,000.00 428 VICTORIA 4,600,000.00 - - 5,450,000.00 - - - - 500,000.00 1,355,000.00 - - - 595,000.00 12,500,000.00 POST HARVEST FACILITIES AND EQUIPMENT (ESTABLISHMENT OF MECHANICAL DRYER) 1,200,000.00 1,200,000.00 IRRIGATION PROJECT (IMPROVEMENT OF SMALL IMPOUNDING PROJECT (SIP)) 1,000,000.00 1,000,000.00 POST HARVEST FACILITIES (MPDP) 2,400,000.00 2,400,000.00 BASIC EDUCATION FACILITIES (PROVISION OF SCHOOL FURNITURES) 1,050,000.00 1,050,000.00 BASIC EDUCATION FACILITIES (REPAIR/REHAB OF CLASSROOMS 3,900,000.00 3,900,000.00 INNOVATIVE PROGRAMS TO EDUCATION/ABOT-ALAM PROGRAM 500,000.00 500,000.00 CSO CAPABILITY BUILDING - LOCAL TOURISM DEVT PROJECT 500,000.00 500,000.00 PROTECTIVE SERVICES - CAPABILITY BUILDING 605,000.00 605,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)- MICRO ENTERPRISE DEVT TRACK 750,000.00 750,000.00 LOCAL ROAD MAINTENANCE 595,000.00 595,000.00 PROVINCE OF ZAMBALES 46,680,000.00 7,049,000.00 - 26,343,042.00 14,574,500.00 - 21,245,598.00 3,194,000.00 3,700,000.00 40,461,360.00 7,057,500.00 - 1,295,000.00 2,800,000.00 174,400,000.00 429 BOTOLAN 3,700,000.00 1,500,000.00 - 2,100,000.00 - - 2,100,000.00 - - 2,600,000.00 500,000.00 - - - 12,500,000.00 FARM IMPLEMENTS AND TOOLS FOR AGRICULTURAL DEVELOPMENT FOR BARANGAY POONBATO (PROGRAM CODE: DA 02, DA 10) 600,000.00 600,000.00 REHABILITATION OF WATER SYSTEM/IRRIGATION COMPLETION 1,500,000.00 1,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENT UPLAND AND LOWLAND BRGYL FARMERS AND FISHERFOLKS PROPERLY IMPLEMENTED 2,100,000.00 2,100,000.00 LIVELIHOOD PROGRAM FOR BRGY. BELBEL WITH 250 HOUSEHOLDS IMPLEMENTED 500,000.00 500,000.00 LIVELIHOOD PROGRAM FOR 250 HOUSEHOLDS-SAMAHAN NG KATUTUBONG KABABAIHAN NG CABATUAN PROPERLY IMPLEMENTED 500,000.00 500,000.00 GULAYAN SA PAARALAN FOR 34 ELEMENTARY SCHOOLS AND 8 HIGH SCHOOLS 500,000.00 500,000.00 CLASSROOM REPAIRED AND REHABILITATED/EDUCATIONAL FACILITIES PROVIDED 1,600,000.00 1,600,000.00 VARIOUS DOH HFEP PROJECTS 2,100,000.00 2,100,000.00 MEDICAL INSTRUMENTS AND EQUIPMENT ACQUIRED - REPAIR OF REHABILITATION OF 10 BED CLINIC COMPLETED. MEDICAL SUPPLIES AND EQUIPMENT ACQUIRED - LIVELIHOOD PROGRAM IMPLEMENTED 2,600,000.00 2,600,000.00 YAMAN PINOY: LIVELIHOOD PROGRAM FOR 15 HOUSEHOLDS PER BARANGAY (HIGHLAND) WITH 826 IPS WOMEN IMPLEMENTED 500,000.00 500,000.00 430 CABANGAN 3,337,000.00 549,000.00 - 1,070,000.00 - - 2,580,000.00 2,094,000.00 - 1,870,000.00 1,000,000.00 - - - 12,500,000.00 REHABILITATION OF CABANGAN COMMUNAL IRRIGATION SYSTEM IRRIGATION PROJECTS 549,000.00 549,000.00 TRAINING ON ORGANIC FERTILIZER PRODUCTION 837,000.00 837,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 1,000,000.00 1,000,000.00 PURCHASE PATROL BOAT (FIBER GLASS WITH TELESCOPE, HANDLED RADIO & GPRS) 500,000.00 500,000.00 8 UNITS MOTORIZED BANCA 500,000.00 500,000.00 GOAT PRODUCTION/RAISING 500,000.00 500,000.00 REPAIROFINSIDECEILING-KINDER, GRADE I & II - CLASSROOMS 900,000.00 900,000.00 GULAYAN SA PAARALANG ELEMENTARYA 170,000.00 170,000.00 REPAIR OF RURAL HEALTH UNITS 2,580,000.00 2,580,000.00 TULONG PANGHANAPBUHAY SA ATING DISADVANTAGE (TUPAD) 594,000.00 594,000.00 OVERSEAS FILIPINOWORKER (OFW)REINTEGRATION PROG. 500,000.00 500,000.00 DOLE-AMP (DOLE-ADJUST MEASURES PROGRAM) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 880,000.00 880,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - DELICACIES, PRODUCTION OF DRIED CHILI, PRODUCTION OF LAUNDRY DETERGENT AND DISHWASHING LIQUID 990,000.00 990,000.00 YAMAN PINOY 500,000.00 500,000.00 SHARED SERVICE FACILITY 500,000.00 500,000.00 431 CANDELARIA 4,512,000.00 - - 2,764,000.00 800,000.00 - 912,640.00 - - 3,511,360.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 4,512,000.00 4,512,000.00 50 UNITS WATER PUMPS INSTALLED - 6 UNITS DIVING GEARS, 1 UNIT UNDERWATER CAMERA, 8 HAND HELD RADIO WITH REPEATER ACQUIRED - 600 LINEAR METER OF EARTH CANAL CONCRETED - 650 LINEAR METER OF EARTH CANAL REHABILITATED - 650 LINEAR METER OF EARTH CANAL REHABILITATED - REPAIRED 3 - CLASSROOMS IN THE BOD BUILDING 2,756,000.00 2,756,000.00 GULAYAN SA PAARALAN 8,000.00 8,000.00 PURCHASE OF HAND-HELD RADIO 16 UNITS AND DISASTER EQUIPMENT 800,000.00 800,000.00 COMMUNITY RN HEALS 504,000.00 504,000.00 DENGUE 6 PAX 408,640.00 408,640.00 ESTABLISHING GROUP ANDF FAMILY ENTERPRISE SUCH AS MINI- GROCERY, SARI-SARI STORE AND OTHER AGRI-BUSINESS BASED ENTERPRISE 704,000.00 704,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 660,000.00 660,000.00 AT6 LEAST 14 BARANGAYS WITH ECCD) DAY CARE SERVICE FROM THE 16 BARANGAYS. 14 SERVICE PROVIDERS AND DAY CARE CHILDREN HAD BENEFITED OF THE PROGRAM TO HAVE SUITABLE PLACE TO LEARN AND DEVELOP DAY CARE CHILDREN IN A HEALTHY WAY TO MEET NOT ONLY THE BASIC NEEDS FOR PRTOTECTION, FOOD AND CARE BUT ALSO TO MEET THE BASIC NEEDS FOR INTERACTION AND STIMULATION, AFFECTION, SECURITY AND LEAVING THROUGH EXPLORATION AND DISCOVERY. 1,120,000.00 1,120,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 14 DAY CARE WORKERS PROVIDED REFRESHER COURSE SEMINAR AND TRAININGS FOR ECCD IMPLEMENTATION AND TOGETHER WITH THE SNP WORKERS FOR 2 BARANGAYS WITHOUT DAY CARE CENTER YET. 20 PES WORKERS WERE WELL EQUIP IN HANDLING PES, SENIOR CITIZEN, WOMEN, SOLO PARENT, PWD, YOUTH AND OTHER SERVICES RELATED TO SOCIAL WELFARE PROGRAMS 500,000.00 500,000.00 VOCATIONAL BUILDING CONSTRUCTED ( 120 SQ.M. ) 527,360.00 527,360.00 432 CASTILLEJOS 2,100,000.00 5,000,000.00 - 650,000.00 - - 1,950,000.00 - - 2,240,000.00 - - - 560,000.00 12,500,000.00 INSTALLATION/REHABILITATION OF IRRIGATION SYSTEM 5,000,000.00 5,000,000.00 REHABILITATION OF FISHPONDS 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 1,100,000.00 1,100,000.00 BASIC EDUCATION FACILITIES - ACQUISITION OF ADDITIONAL SCHOOL FURNITURES 650,000.00 650,000.00 CONTROL OF INFECTIOUS DISEASES (MALARIA, RABIES, LEPROSY, TB AND DENGUE 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 950,000.00 950,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - EMPLOYMENT FACILITATION TRACK (HANDICRAFT, DRESSMAKING AND FOOD PROCESSING) 2,240,000.00 2,240,000.00 TO BE DETERMINED 560,000.00 560,000.00 433 IBA 5,070,000.00 - - - 630,000.00 - 2,000,000.00 500,000.00 - 4,200,000.00 - - - - 12,400,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION 2,110,000.00 2,110,000.00 IRRIGATION PROJECTS 2,460,000.00 2,460,000.00 MARINE RESERVE AND FISH SANCTUARY 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALIN TUBIG) 630,000.00 630,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM (DILP) 500,000.00 500,000.00 PROTECTED SERVICES INFRASTRUCTURE PROJECTS 2,200,000.00 2,200,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO ENTERPRISE DEVELOPMENT 2,000,000.00 2,000,000.00 434 MASINLOC 6,555,000.00 - - - 2,000,000.00 - - - - 1,650,000.00 1,700,000.00 - 595,000.00 - 12,500,000.00 FARM IMPLEMENTS: VARIETY OF MARKET READY BAMBOO STICK PRODUCED 500,000.00 500,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 2,000,000.00 2,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENT 2,000,000.00 2,000,000.00 PROVISION OF ONE UNIT DEEP SEA FISHING BOAT (MOTHER BOAT TYPE) 2.TWENTY UNITS OF PAYAOS ANCHORED ON VARIOUS LOCATIONS 3. TWO UNITS MOTORIZED BANCA 1,155,000.00 1,155,000.00 FEED MILL AND OUTLET OF LOCALLY FORMULATED FEEDS 900,000.00 900,000.00 RESCUED DISASTER VICTIMS WITH FIRST AID PROVIDED 1,000,000.00 1,000,000.00 FLOOD RISK REDUCED THRU HIGH TECH MONITORING & EARLY WARNING SYSTEM ALONG THE CATCHMENT AND RECHARGE AREAS LOCATED ABOVE VULNERABLE COMMUNITIES 1,000,000.00 1,000,000.00 5 UNITS DAY CARE CENTER UPGRADED BASED ON PROGRAM OF WORK FROM OFFICE OF THE MUNICIPAL ENGINEER. 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK 1,150,000.00 1,150,000.00 OTOP SERVICES: READY TO MARKET BURI BAGS, SCHOOL UNIFORM, CURTAIN, PILLOWCASE, RUGS 500,000.00 500,000.00 300 DESERVING STUDENTS (15-25 Y,O.) HAD BEEN EMPLOYED DURING THE SUMMER OF 2015 1,200,000.00 1,200,000.00 SKILLS ENHANCEMENT TRAINING 595,000.00 595,000.00 435 OLONGAPO CITY - - - 4,807,542.00 - - 2,222,458.00 600,000.00 - 3,870,000.00 1,000,000.00 - - - 12,500,000.00 ACCESS TO FORMAL AND INFORMAL ADM OF EDUCATION 2,494,800.00 2,494,800.00 GULAYAN SA PAARALAN 114,000.00 114,000.00 PROGRAM FOR SPED HI STUDENTS 634,722.00 634,722.00 REHABILITATION AND REPAIR OF ELEMENTARY CLASSROOMS 540,000.00 540,000.00 SCIENCE LABORATORY TABLES AND CHAIRS 516,180.00 516,180.00 LIBRARY TABLES AND CHAIRS 507,840.00 507,840.00 COMMUNITY HEALTH TEAM MOBILIZATION 906,000.00 906,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,316,458.00 1,316,458.00 EXPANSION PROGRAM OF COMMUNITY-BASED EMPLOYMENT SERVICE AND SKILLS TRAINING CENTER 600,000.00 600,000.00 MONITORING AND PROVISION OF SUPPORT PROGRAMS AND SERVICES TO INDIVIDUALS AND FAMILIES ON THE STREET LIKE MENDICANTS, HOMELESS, STREET CHILDREN, PWD'S AND OTHER DISADVANTAGED INDIVIDUALS LIVING ON THE STREET 1,350,000.00 1,350,000.00 SUSTAINABLE LIVELIHOOD PROGRAM/ SKILLS TRAINING - MICROENTERPRISE DEVELOPMENT TRACK FOR PANTAWID BENEFICIARIES - 200 HH - 4PS, 100 PWD WILL AVAIL THE MICROENTERPRISE DEVELOPMENT TRACK 1,800,000.00 1,800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM/ SKILLS TRAINING - MICROENTERPRISE DEVELOPMENT TRACK FOR PANTAWID BENEFICIARIES - SKILS TRAINING (4 SESSIONS IN 17 BRGYS.) 720,000.00 720,000.00 YAMAN PINOY: SUSTAINABLE LIVELIHOOD THRU HANDICRAFT PROJECT OF IP WOMEN IN SUPPORT WITH ECO-PROTECTION PROGRAM 1,000,000.00 1,000,000.00 436 PALAUIG 2,800,000.00 - - 3,000,000.00 2,500,000.00 - - - - 4,200,000.00 - - - - 12,500,000.00 POST-HARVEST FACILITIES AND EQUIPMENT (MULTI-PURPOSE DRYING PAVEMENT) 1,000,000.00 1,000,000.00 SUSTAINABLE AGRI-FISHER BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 800,000.00 800,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES: REPAIR / REHABILITATION OF CLASSROOMS 3,000,000.00 3,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 1,500,000.00 1,500,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,500,000.00 1,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 2,200,000.00 2,200,000.00 FEEDING PROGRAM FOR SEVERELY WASTED CHILDREN 500,000.00 500,000.00 437 SAN ANTONIO 3,658,000.00 - - 2,030,000.00 1,000,000.00 - 2,553,000.00 - - 2,559,000.00 - - 700,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 3,658,000.00 3,658,000.00 4 WHEEL TRACTOR WITH COMPLETE ACCESSORIES/IMPLEMENTS - 2-UNIT FLATBED GRAIN DRYER - SHALLOWTUBE WELLS - PRODUCTION OF ORGANIC FERTILIZER - BROILER PRODUCTION - REPAIR/REHABILITATION OF CLASSROOMS 2,030,000.00 2,030,000.00 POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 CHT MOBILIZATION 553,000.00 553,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 TB CONTROL 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 609,000.00 609,000.00 SUSTAINABLE LIVELIHOOD THRU MULTI-PROJECTS AND TRAINING PROGRAM 750,000.00 750,000.00 SUSTAINABLE LIVELIHOOD THRU ALL-IN-ONE COMPUTER SHOP FOR 1 DIFFERENTLY ABLED PERSONS (DAP) GROUP AND 1 OUT OF SCHOOL YOUTH (OSY) GROUP 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD THRU RICE RETAILING FOR 4P'S GROUP AND SOLO PARENTS GROUP 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD SKILLS TRAININGS FOR DIFFERENTLY ABLED PERSONS & OT OF SCHOOL YOUTH 700,000.00 700,000.00 438 SAN FELIPE 1,310,000.00 - - 3,729,000.00 1,630,000.00 - 1,480,000.00 - - 2,811,000.00 1,000,000.00 - - 540,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,310,000.00 1,310,000.00 780 LINEAR METER SWIP - 3 HAND TRACTORS AND 3 STWAND 2 UNITS PATROL BOAT - CONSTRUCTION OF VERMI-COMPOSTING FACILITY - PURCHASE 1 UNIT OF CLOSED STORAGE VAN - 9 SCHOOL BUILDINGS AND FURNITURED CLASSROOMS 2,399,000.00 2,399,000.00 13 ELEMENTARY SCHOOLS/CONSTRUCTION OF PLANT NURSERY 270,000.00 270,000.00 PRODUCTION OF MIMOSA MODULES/ALS FOR PWD/EARLY IMPLEMENTATION OF EARLY HIGH /SCHOOL/100% PARTICIPATION, LITERACY AND DROPOUT RATE 1,060,000.00 1,060,000.00 SPRING LEVEL 1 - 100 HOUSEHOLDS 1,630,000.00 1,630,000.00 EXPANDED HEALTH SERVICES OF THE RHU BY WIDENED COVERAGE OF ITS PRIORITY PROGRAMS 1,480,000.00 1,480,000.00 1 HOUSE TYPE BUILDING WITH BEDROOMS AND SESSION AREA AND UPGRADED DCC 1,750,000.00 1,750,000.00 17 DAY CARE CENTERS SUPPORTED WITHECCD LEARNING MATERIALS 561,000.00 561,000.00 LIVELIHOOD SKILLS TRAINING AND MICRO FINANCE 500,000.00 500,000.00 1 ESTABLISHED OTOP STORE EXPRESS 1,000,000.00 1,000,000.00 ICFP: 18 HOUSEHOLDS 540,000.00 540,000.00 439 SAN MARCELINO 2,900,000.00 - - - 1,200,000.00 - 1,400,000.00 - 3,700,000.00 3,300,000.00 - - - - 12,500,000.00 TRADING POST 1,200,000.00 1,200,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTOR) (WITH COMPLETE ACCESSORIES) 1,700,000.00 1,700,000.00 RESCUE EQUIPMENT (WEAPONS CARRIER) (WITH COMPLETE ACCESSORIES) 1,200,000.00 1,200,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (REPAIR AND REHABILITATION OF RHU 2) 1,400,000.00 1,400,000.00 LOCAL TOURISM DEVELOPMENT PROJECT (DEVELOPMENT OF MAPANUEPE LAKE) 3,700,000.00 3,700,000.00 CONSTRUCTION, REPAIR AND REHABILITATION OF DAY CARE CENTERS 1,100,000.00 1,100,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) CUM SKILLS TRAINING 2,200,000.00 2,200,000.00 440 SAN NARCISO 5,815,000.00 - - 2,185,000.00 - - 2,000,000.00 - - 2,500,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 5,815,000.00 5,815,000.00 MARINE PROTECTED AREA MANAGEMENT - POVERTY ALLEVIATION AND FOOD SECURITY THRU AGRICULTURAL SUSTAINABLE DEVELOPMENT - REPAIR/REHABILITATION OF CLASSROOMS AND PROVISION OF SCHOOL FURNITURE`S & FIXTURES 2,185,000.00 2,185,000.00 EXPANSION OF RURAL HEALTH UNIT EREGION XISTING BIRTHING STATION, CONSTRUCTION OF TB DOTS AREA AND PROVISION OF MEDICAL SUPPLIES AND EQUIPMENTS 2,000,000.00 2,000,000.00 LIVELIHOOD DEVELOPMENT PROGRAM 1,500,000.00 1,500,000.00 LIVELIHOOD PROGGRAM 500,000.00 500,000.00 HOME-BASED LIVELIHOOD PROJECT 500,000.00 500,000.00 441 SANTA CRUZ 1,373,000.00 - - 2,907,500.00 3,814,500.00 - 2,047,500.00 - - - 657,500.00 - - 1,700,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,373,000.00 1,373,000.00 MULTI-PURPOSE SOLAR DRYING PAVEMENT WITH SHADE (SHED) - ORGANIC FERTILIZER PRODUCTION (VERMICULTURE) - POST HARVEST EQUIPMENT (RICE COMBINE HARVESTER) - FARM EQUIPMENT (ACQUISITION) - PROVISION OF SCHOOL WATER SUPPLIES AND REPAIR OF DILAPIDATED CLASSROOMS 1,150,000.00 1,150,000.00 REPAIR OF SCHOOL BUILDING 1,757,500.00 1,757,500.00 REHABILITATION OF SEA WALL ALONG PUBLIC MARKET 1,414,500.00 1,414,500.00 CONSTRUCTION OF DRAINAGE SYSTEM ALONG N. ELA & N. MOSE ST. 2,400,000.00 2,400,000.00 HEALTH EMERGENCY MANAGEMENT 547,500.00 547,500.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFECTIOUS DISEASES (TB CONTROL, LEPROSY, RABIES, HIV/AIDS & STI, DENGUE PROGRAMS) 1,500,000.00 1,500,000.00 MEAT PROCESSING AND ENTERPRISES 140,000.00 140,000.00 FOOD PROCESSING AND ENTERPRISES 517,500.00 517,500.00 CONCRETING OF LOCAL ACCESS ROADS 1,700,000.00 1,700,000.00 442 SUBIC 3,550,000.00 - - 1,100,000.00 1,000,000.00 - - - - 5,150,000.00 1,200,000.00 - - - 12,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD - PAYAO (ARTIFICIAL REEF), SAMARAL CULTURE, & FOOD PROCESSING & ANIMAL DISPERSAL 1,850,000.00 1,850,000.00 POST HARVEST FACILITY - MECHANICAL DRYER 700,000.00 700,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT - MOTORIZED FISHING BOAT AND FISH NETS 500,000.00 500,000.00 MARINE PROTECTED AREA 500,000.00 500,000.00 REPAIR/REHABILITATION OF SCHOOL BUILDINGS 600,000.00 600,000.00 ABOT-ALAM PROGRAM 500,000.00 500,000.00 RESCUE EQUIPMENT 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES (INFRASTRUCTURE PROJECTS) - REHABILITATION/IMPROVEMENT OF 28 DAY CARE CENTERS 4,650,000.00 4,650,000.00 PROTECTIVE SERVICES (CAPACITY BUILDING) - PURCHASE OF PROGRAM AND LEARNING MATERIALS FOR DAY CARE CENTERS 500,000.00 500,000.00 OTOP STORE EXPRESS "PASALUBONG" 1,200,000.00 1,200,000.00 REGION IV-A 386,465,812.60 8,951,920.00 31,444,600.00 165,384,557.00 327,654,348.10 8,178,000.00 211,930,900.00 28,280,450.00 45,312,635.40 268,037,070.00 89,224,518.90 - 49,687,898.00 166,947,290.00 1,787,500,000.00 BATANGAS 101,975,975.00 2,701,920.00 2,350,000.00 59,540,157.00 77,817,675.00 - 52,553,300.00 500,000.00 6,800,000.00 60,728,350.00 15,536,750.00 - 13,959,898.00 31,585,975.00 426,050,000.00 443 AGONCILLO 2,433,500.00 - - 4,160,000.00 1,676,500.00 - 3,730,000.00 - - - - - 500,000.00 - 12,500,000.00 PRODUCTION OF ORGANIC FERTILIZERS 500,000.00 500,000.00 LIVELIHOOD (CATTLE FATTENING-DISPERSAL PROJECT) 1,431,910.00 1,431,910.00 INFRA SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (FISH NETS/GILL NETS) 501,590.00 501,590.00 GULAYAN SA PAARALAN 160,000.00 160,000.00 REHABILITATION OF CLASSROOMS 4,000,000.00 4,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) 1,676,500.00 1,676,500.00 HEALTH FACILITY ENHANCEMENT PROGRAM 1,154,000.00 1,154,000.00 RABIES ELIMINATION 500,000.00 500,000.00 RN HEALS 576,000.00 576,000.00 SANITARY TOILET 1,000,000.00 1,000,000.00 TB CONTROL 500,000.00 500,000.00 COMMUNITY BASED TRAINING PROGRAM 500,000.00 500,000.00 444 ALITAGTAG - - - 3,000,000.00 - - 8,000,000.00 - - - - - 1,500,000.00 - 12,500,000.00 BASIC EDUCATION FACILITIES 3,000,000.00 3,000,000.00 BIRTHING FACILITY 4,280,000.00 4,280,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 3,000,000.00 3,000,000.00 RN HEALS 720,000.00 720,000.00 TECHNICAL-VOCATIONAL TRAINING/COMMUNITY BASED TRAINING 1,500,000.00 1,500,000.00 445 BALAYAN 4,140,000.00 - - 3,300,000.00 2,060,000.00 - 1,800,000.00 - - 1,200,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 2,295,000.00 2,295,000.00 PURCHASE OF HAULING TRUCKS - EXPANDED AGRI ACTIVITIES (LIVELIHOOD RIC) - AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES - MANGROVE TREE PLANTING - VARIOUS BFAR PROJECTS 1,845,000.00 1,845,000.00 PURCHASE OF FISHERY BOATS - SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (FISH NETS) - AQUACULTURING - MARINE RESERVE & FISH SANCTUARY - AQUA FISHERY TRAINING - GULAYAN SA PAARALAN 300,000.00 300,000.00 REHABILITATION OF CLASSROOMS 3,000,000.00 3,000,000.00 SALINTUBIG 560,000.00 560,000.00 CONSTRUCTION OF DRAINAGE SYSTEM 1,000,000.00 1,000,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 MATERNAL, NEONATAL CHILD HEALTH/DENGUE CONTROL/COMMUNITY HEALT TEAM MOBILIZATION 600,000.00 600,000.00 RABIES ELIMINATION 600,000.00 600,000.00 TB, LEPROSY, STD 600,000.00 600,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY 700,000.00 700,000.00 PROTECTIVE SERVICES CAPACITY BUILDING 500,000.00 500,000.00 446 BALETE 1,137,375.00 - - 700,000.00 1,550,000.00 - 1,956,900.00 - - 5,318,350.00 1,200,000.00 - - 637,375.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,137,375.00 1,137,375.00 BASIC EDUCATION FACILITIES: 700,000.00 700,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 1,050,000.00 1,050,000.00 CAPABILITY BUILDING FOR CSO 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,956,900.00 1,956,900.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICRO ENTERPRISE DEVELOPMENT TRACK 2,560,000.00 2,560,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (REPAIR OF DAY CARE CENTERS) 2,758,350.00 2,758,350.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM > BUSINESS DEVELOPMENT SERVICE > INSTITUTIONAL STRENGTHENING FOR MFIS 1,200,000.00 1,200,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 637,375.00 637,375.00 447 BATANGAS CITY 2,450,000.00 - 1,500,000.00 1,400,000.00 - - 2,100,000.00 - - 3,000,000.00 600,000.00 - 1,275,000.00 1,175,000.00 13,500,000.00 VARIOUS DA PROJECTS 1,675,000.00 1,675,000.00 BATANGS ORGANIC FARMING - SUSTAINABLE LIVELIHOOD PROGRAM - LOCAL FISHERIES PROGRAM 775,000.00 775,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TRAINING ON ENVIRONMENTAL PROTECTION PROGRAMS TO ALL BENEFICIARIES/TRAINING OF CIVIL SOCIETY ORGANIZATION ON ENVIRONMENTAL PROTECTION PROGRAMS 1,500,000.00 1,500,000.00 ALTERNATIVE LEARNING SYSTEM 1,400,000.00 1,400,000.00 HEALTH TRAINING PROGRAM 1,134,048.00 1,134,048.00 JOB ORIENTATION AND JOB PLACEMENT FOR UNEMPLOYED AND UNDEREMPLOYED HEALTH PROFESSIONALS 965,952.00 965,952.00 PHYSICAL RESTORATION FOR PERSONS WITH DISABILITIES 500,000.00 500,000.00 SENIOR CITIZEN SOCIAL PENSION 700,000.00 700,000.00 SUPPLEMENTAL FEEDING FO DAY CARE CHILDREN AND OTHER CHILDREN WITH SPECIAL NEEDS 900,000.00 900,000.00 RICE FOR MOST NEEDY FAMILIES OF THE CITY 900,000.00 900,000.00 SUSTAINABLE BARANGAY BASED ENTERPRISE (OTOP) 600,000.00 600,000.00 COMMUNITY ROAD PROJECT (REPAIR OF FMR) PRIORITY WILL BE BARANGAYS WITH LOWEST MAGNITUDE OF POVERTY 1,175,000.00 1,175,000.00 VARIOUS TESDA PORJECTS 1,275,000.00 1,275,000.00 SOCIAL ENHANCEMENT AND PRACTICAL SKILLS TRAINING FOR POSSIBLE EMPLOYMENT OR JOB OPPURTUNITIES - TRAINING FOR WORK SCHOLARSHIP PROGRAM - 448 BAUAN 3,000,000.00 - - - 5,300,000.00 - 3,200,000.00 - - 1,000,000.00 - - - - 12,500,000.00 AGRICULTURE PRODUCTION AND DEVELOPMENT PROJECT 3,000,000.00 3,000,000.00 MULTI FUNCTION TRAINING CENTER 5,300,000.00 5,300,000.00 HEALTH ENHANCEMENT PROGRAM 3,200,000.00 3,200,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN DAY CARE CENTERS 500,000.00 500,000.00 449 CALACA 2,250,000.00 - - 4,050,000.00 5,400,000.00 - - - - 800,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 2,250,000.00 2,250,000.00 2 UNITS OF PATROL BOAT AND ACCESSORIES - ORGANIC FARMING/ VERMICOMPOSTING AND VERMICULTURE PROJECT - GULAYAN SA PAARALAN 1,050,000.00 1,050,000.00 REPAIR AND MAINTENANCE OF SCHOOL BUILDING 3,000,000.00 3,000,000.00 CONSTRUCTION OF MATALA WATERWORKS 3,100,000.00 3,100,000.00 VARIOUS DILG PROJECTS 800,000.00 800,000.00 PROPOSED RADIO COMMUNICATION EQUIPMENTS - CONSTRUCTION OF FOOT BRIDGE - CAPACITY BUILDING FOR CSO- BASIC LIFE SUPPORT COMMUNITY CPR TRAINING FOR LAY RESCUERS/ LECTURE-DEMONSTRATION OF FIRST-AID/BLS-CPR 1,500,000.00 1,500,000.00 PANTAWID KABUHAYAN PROGRAM (LIVELIHOOD) 800,000.00 800,000.00 450 CALATAGAN 3,040,000.00 - 850,000.00 850,000.00 3,050,000.00 - 2,353,000.00 - 500,000.00 - 983,750.00 - 873,250.00 - 12,500,000.00 PURCHASE OF NON-MOTORIZED FISHING BOAT 850,000.00 850,000.00 DISTRIBUTION OF FISHING GEARS/EQUIPMENTS 500,000.00 500,000.00 VARIOUS DA PROJECTS 1,690,000.00 1,690,000.00 SEAWEEDS FARMING - GOAT RAISING - MANGO PROCESSING (EXPANSION) - CARABAO DAIRY PROCESSING - ORGANIC COMPOST PRODUCTION - MULTI-METER DEVICE - SHALLOWTUBE WELL - NATIONAL GREENING PROGRAM 850,000.00 850,000.00 REPAIR OF CLASSROOM 850,000.00 850,000.00 SALINTUBIG 500,000.00 500,000.00 EVACUATION FACILITY 1,700,000.00 1,700,000.00 RESCUE EQUIPMENT 850,000.00 850,000.00 HEALTH FACILITY ENHANCEMENT 1,105,000.00 1,105,000.00 CAPABILITY TRAINING 748,000.00 748,000.00 RABIES ELIMINATION 500,000.00 500,000.00 SNORKLING GUIDE TRAINING 500,000.00 500,000.00 YAMAN PINOY 983,750.00 983,750.00 COMMUNITY BASED TRAINING 873,250.00 873,250.00 451 CUENCA 3,470,000.00 - - 3,700,000.00 - - 1,080,000.00 - - 4,250,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,470,000.00 3,470,000.00 ORGANIC FARMING (ORGANIC FERTILIZER PRODUCTION, CONSTRUCTION OF VERMICOMPOSTING PLANT AND FACILITIES) - INFRASTRUCTURE SUPPORT TO AGRICULTURE (TRACTOR) - ESTABLISHMENT OF GREENHOUSE - REHABILITATION OF CLASSROOM 3,700,000.00 3,700,000.00 REGISTERED NURSES FOR HEALTH ENHANCEMENT AND LOCAL SERVICE PROGRAM 576,000.00 576,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 504,000.00 504,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 4,250,000.00 4,250,000.00 452 IBAAN 4,800,000.00 - - 2,750,000.00 2,000,000.00 - - - - 2,950,000.00 - - - - 12,500,000.00 ESTABLISHMENT OF IBAAN ORGANIC TRADING POST 2,000,000.00 2,000,000.00 ORGANIC FERTILIZER PRODUCTION THROUGH VERMICOMPOSTING PROJECT FOR SMALLHOLDER FARMERS OF IBAAN 500,000.00 500,000.00 PROVISION OF FARMING IMPLEMENTS/ TOOLS AND EQUIPMENTS: ONE STOP SHOP 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL PRODUCTION: PROCUREMENT OF THREE UNITS OF RICE REAPER FOR USE OF RICE FARMERS OF IBAAN, BATANGAS 500,000.00 500,000.00 BARANGAY-BASED AGRI-FISHERY TRAINING FOR SMALL STAKEHOLDERS OF IBAAN 800,000.00 800,000.00 FARMING INPUTS SUBSIDY FOR SMALL STAKEHOLDERS OF IBAAN 500,000.00 500,000.00 REPAIR OF 3 CLASSROOM SCHOOL BUILDING (GABALDON BLDG.) 2,750,000.00 2,750,000.00 CONSTRUCTION OF DRAINAGE 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (NET BAG MAKING) 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SEA-K - VENDING, NET BAG MAKING, POULTRY RAISING AND OTHER LIVELIHOOD PROJECTS 950,000.00 950,000.00 453 LAUREL 2,700,000.00 - - 2,850,000.00 1,000,000.00 - 2,000,000.00 - - 3,950,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 1,950,000.00 1,950,000.00 PROMOTION AND DEVELOPMENT OF ORGANIC FERTILIZER - CATTLE FATTENING - PURCHASE OF HAND TRACTORS - VARIOUS BFAR PROJECTS 750,000.00 750,000.00 PURCHASE OF MOTORIZED FISHING BOATS - PURCHASE OF FISHING NETS AND SCREENS - REHABILITATION / REPAIR OF SCHOOL BUILDINGS 1,100,000.00 1,100,000.00 PROCUREMENT OF FURNITURES FOR USE OF STUDENTS 1,050,000.00 1,050,000.00 LIVELIHOOD TRAININGS / LITERARY PROGRAMS FOR OSY (ALTERNATIVE LEARNING SYSTEM - ALS) 500,000.00 500,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 HANGING BRIDGE 1,000,000.00 1,000,000.00 LAURELIAN BABY BOX (HANDLE WITH CARE) 1,400,000.00 1,400,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 600,000.00 600,000.00 REPAIR /UPGRADING OF DAYCARE CENTER 1,000,000.00 1,000,000.00 CONSTRUCTION OF THREE-CLASSROOM DAYCARE CENTER BUILDING 1,450,000.00 1,450,000.00 LIVELIHOOD PROJECTS (CANDLE MAKING, DISHWASHING MAKING, SOAP MAKING, FOOD PROCESSING, TAILORING AND DRESSMAKING) 1,500,000.00 1,500,000.00 454 LEMERY 3,000,000.00 - - 840,000.00 5,510,000.00 - 500,000.00 - - 2,650,000.00 - - - - 12,500,000.00 ORGANIC VEGETABLE PRODUCTION 500,000.00 500,000.00 INSTALLATION OF SHALLOWTUBE WELLS 500,000.00 500,000.00 CONSTRUCTION OF WATERWAYS (FOR FARMLOTS) 2,000,000.00 2,000,000.00 REPAIR/MAINTENANCE OF CLASSROOM AT 28,000/ROOM FOR 30 CLASSROOMS 840,000.00 840,000.00 REPAIR/REHABILITATION/IMPROVEMENT OF WATERSYSTEM FACILITIES 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 4,510,000.00 4,510,000.00 CONSTRUCTION OF FOOTBRIDGE - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF BARANGAY HEALTH STATION 500,000.00 500,000.00 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY CARE 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTERS 1,149,960.00 1,149,960.00 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER @ 11,1112.00 FOR 45 DCC 500,040.00 500,040.00 455 LIAN 5,800,000.00 - - - 3,939,600.00 - 2,760,400.00 - - - - - - - 12,500,000.00 PURCHASE OF 2 MOTORIZED PATROL BOAT 2,000,000.00 2,000,000.00 FISH PROCESSING 600,000.00 600,000.00 VARIOUS DA PROJECTS 3,200,000.00 3,200,000.00 PURCHASE OF 18 HAND TRACTORS COMPLETE SET - 4 MECHANICAL DRYER (FLAT-BED DRYER) - TRAINING ON VEGETABLE PRODUCTION - RICE PRODUCTION MGT. TRAINING - VERMI-FARMING - CONSTRUCTION OF DEEPWELL LEVEL 2 WATER SUPPLY SYSTEM 3,939,600.00 3,939,600.00 CONSTRUCTION OF BRGY HEALTH STATION AT BRGY MATABUNGKAY 1,000,000.00 1,000,000.00 MATERNITY & NEWBORN CARE 538,400.00 538,400.00 TB DOTS PACKAGES 500,000.00 500,000.00 TRAINING FOR DENGUE CONTROL 722,000.00 722,000.00 456 LIPA CITY - - - - - - - - - 12,500,000.00 - - - - 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 12,500,000.00 12,500,000.00 457 LOBO 2,060,000.00 2,701,920.00 - 3,479,232.00 - - 2,500,000.00 - - - - - 1,758,848.00 - 12,500,000.00 CONSTRUCTION, IMPROVEMENT AND REHABILITATION OF IRRIGATION FACILITIES (INTAKE AND CANAL SYSTEM) 2,701,920.00 2,701,920.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL AND FISHERY PRODUCTION 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) (WINE STRAINER, INDIAN MANGO AND TAMARIND PRODUCT PROCESSING, KAING MAKING, PAPER MAKING, COCONUT COIR MAKING, MINI COLD STORAGE 560,000.00 560,000.00 GULAYAN SA PAARALAN 479,232.00 479,232.00 REPAIR/IMPROVEMENT/RESTORATION OF SCHOOL BUILDING AND OTHER SCHOOL FACILITIES 3,000,000.00 3,000,000.00 EXPANSION/IMPROVEMENT OF BIRTHING FACILITIES 2,000,000.00 2,000,000.00 PROVISION OF SANITARY TOILETS 500,000.00 500,000.00 COMMUNITY BASED TRAINING 1,758,848.00 1,758,848.00 458 MABINI - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF PUBLIC MARKET EXTENSION 12,500,000.00 12,500,000.00 459 MALVAR 6,700,000.00 - - - - - - - - - - - 1,600,000.00 4,200,000.00 12,500,000.00 CONSTRUCTION OF POST HARVEST FACILITY WITH MECHANICAL DRYER 6,700,000.00 6,700,000.00 TO BE DETERMINED 4,200,000.00 4,200,000.00 TRAINING FOR WORK SCHOLARSHIP PROGRAM 1,600,000.00 1,600,000.00 460 MATAAS NA KAHOY 4,025,000.00 - - 4,047,925.00 927,075.00 - 1,500,000.00 - - 1,000,000.00 - - - 1,000,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 550,000.00 550,000.00 INFRASTRUCTURE SUPPORT TO AGRI/FISHERY PRODUCTION 975,000.00 975,000.00 POST HARVEST 500,000.00 500,000.00 CONSTRUCTION OF WHARF 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES 3,547,925.00 3,547,925.00 BASIC EDUCATION FACILITIES 500,000.00 500,000.00 PUBLIC MARKET (REHABILITATION) 927,075.00 927,075.00 INFECTIOUS DISEASE CONTROL 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROJ./CAPDEV 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION 1,000,000.00 1,000,000.00 461 NASUGBU 2,982,000.00 - - 2,100,000.00 1,058,000.00 - 1,500,000.00 500,000.00 - 2,360,000.00 2,000,000.00 - - - 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS LIVELIHOOD ASSISTANCE PROGRAM FOR BENEFICIARIES DEVELOPMENT: CROP PRODUCTION 500,000.00 500,000.00 LIVELIHOOD - UPLAND AND LOWLAND FARMERS 500,000.00 500,000.00 FISH NET/ FISHING GEAR AND MOTORIZED BOAT 1,000,000.00 1,000,000.00 VARIOUS DA PROJECTS 982,000.00 982,000.00 INFRASTRUCTUTE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT -FARM IMPLEMENT AND EQUIPMENTS: COMPOSTING PROJECT - SHREDDING MACHINE, BIO COMPOSTER - ECO TOURISM SITE/ MARINE PROTECTED AREA - REHABILITATION OF ALL ACIDIC LANDS IN NASUGBU - REPAIR AND REHABILITATION OF REHABILITATION OF FARMER'S CENTER AT BRGY. DAYAP - REPAIR AND REHABILITATION OF CLASSROOMS (NASUGBU EAST/WEST CENTRAL SCHOOL AND WAWA ELEMENTARY SCHOOL 1,250,000.00 1,250,000.00 SPECIAL EDUCATION PROGRAM (SPED), ALTERNATIVE LEARNING SYSTEM - TRAININGS 850,000.00 850,000.00 POTABLE WATER SYSTEM IMPROVEMENT ANG MAGYAMAN BANILAD AND KAMATCHILIHAN LAYING OF WATER PIPE FOR BOTH BARANGAY 1,058,000.00 1,058,000.00 MATERNITY AND NEWBORN CARE 500,000.00 500,000.00 MTB DOTS PACKAGES 500,000.00 500,000.00 PRIMARY CARE BENEFITS 500,000.00 500,000.00 TUPAD 500,000.00 500,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRA PROJECTS - HANDWASHING FACILITY FOR ALL DAY CARE CENTERS 610,000.00 610,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: PROVISION OF SEED CAPITAL AND MICRO ENTERPRISE DEVELOPMENT TRACK: FOOD PROCESSING, CHARCOAL MAKING, ETC 1,250,000.00 1,250,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 MICRO ENTERPRISE DEVELOPMENT PROGRAM FOR WOMEN 1,000,000.00 1,000,000.00 LIVELIHOOD PROJECTS: RED EGG MAKING, FISH PROCESSING, TINAPAAN, DRYING OF FISH - LIVELIHOOD PROJECTS FOR WOMEN: GARMENTS (TRAINING/MATERIALS/EQUIPMENT) 500,000.00 500,000.00 462 PADRE GARCIA 5,515,000.00 - - 2,500,000.00 - - 1,032,200.00 - - 500,000.00 500,000.00 - 2,452,800.00 - 12,500,000.00 CAPABILITY BUILDING FOR AGRI PRODUCTIVITY AND ENTERPRENEURIAL DEVELOPMENT 1,500,000.00 1,500,000.00 INSTALLATION OF DRIP IRRIGATION SYSTEM 2,490,000.00 2,490,000.00 VARIOUS DA PROJECTS 1,525,000.00 1,525,000.00 LIVELIHOOD PROGRAM: CATTLE FATTENING - ORGANIC FERTILIZER PRODUCTION - REPAIR/REHABILITATION OF CLASSROOM 2,500,000.00 2,500,000.00 HEALTH FACILITY ENHANCEMENT 1,032,200.00 1,032,200.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 ESTABLISHMENT OF OTOP 500,000.00 500,000.00 TECHNICAL SKILLS DEVELOPMENT 2,452,800.00 2,452,800.00 463 ROSARIO - - - - 9,500,000.00 - - - - - - - - 3,000,000.00 12,500,000.00 VARIOUS DILG PROJECTS 9,500,000.00 9,500,000.00 RENOVATION OF MUNICIPAL PUBLIC MARKET PHASE II - INSTALLATION OF COVERED CANAL AND SIDEWALK - REHABILITATION OF INTERIOR ROADS ALONG ADJOINING STREETS OF POBLACION PROPER 3,000,000.00 3,000,000.00 464 SAN JOSE 560,000.00 - - 3,440,000.00 - - - - - 5,000,000.00 3,500,000.00 - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE - FARM MECHANIZATION 560,000.00 560,000.00 REPAIR/REHABILITATION OF CLASSROOM 3,440,000.00 3,440,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO ENTERPRISE DEVELOPMENT TRACK 2,500,000.00 2,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - EMPLOYMENT FACILITATION TRACK 2,500,000.00 2,500,000.00 YAMAN PINOY - COMMUNITY LEVEL CAPABILITY/CAPACITY BUILDING FOR LIVELIHOOD PROGRAM 3,500,000.00 3,500,000.00 465 SAN JUAN 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 VARIOUS NIA PROJECTS 12,500,000.00 12,500,000.00 IRRIGATION TYPE ELECTRIC PUMP - SUBMERSIBLE PUMP - 466 SAN LUIS 3,000,000.00 - - 1,518,000.00 1,500,000.00 - 1,500,000.00 - - 1,500,000.00 - - - 3,482,000.00 12,500,000.00 VERMI COMPOSTING/VEGETABLE PRODUCTION 1,500,000.00 1,500,000.00 TRADING POST 1,500,000.00 1,500,000.00 REPAIR/REHABILITATION OF SCHOOL BUILDING 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FURNITURE 518,000.00 518,000.00 CONSTRUCTION OF SEA WALL 1,500,000.00 1,500,000.00 DENGUE CONTROL 500,000.00 500,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 500,000.00 500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 500,000.00 500,000.00 ELDERLY - ASSISTIVE DEVICES AND MEDICINES 500,000.00 500,000.00 DISABLED - ASSISTIVE DEVICES AND MEDICINES 500,000.00 500,000.00 WOMEN - LIVELIHOOD (MEAT PROCESSING) 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 3,482,000.00 3,482,000.00 REHABILITATION OF ROADS - REHABILITATION OF ROAD - 467 SAN NICOLAS - - - - 2,000,000.00 - 500,000.00 - 6,300,000.00 1,200,000.00 2,000,000.00 - 500,000.00 - 12,500,000.00 SALINTUBIG 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 ECO-TOURISM PROGRAM-DEVELOPEMNT OF RIVERBANKS' PATHWAY ALONG CALANGAY, PANSIPIT AND POBLACION 6,300,000.00 6,300,000.00 REPAIR/UPGRADING OF DAY CARE CENTER 1,200,000.00 1,200,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 2,000,000.00 2,000,000.00 TESDA TRAININGS AND SEMINARS 500,000.00 500,000.00 468 SAN PASCUAL 2,500,000.00 - - - 2,270,000.00 - 4,730,000.00 - - 500,000.00 - - 2,500,000.00 - 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS DA PROJECTS 2,500,000.00 2,500,000.00 PURCHASE OF FARM TRACTOR AND OTHER AGRICULTURAL TOOLS - PRODUCTION OF ORGANIC FERTILIZER - CONSTRUCTION OF FLOOD CONTROL DRAINAGE SYSTEM 2,270,000.00 2,270,000.00 ENHANCEMENT OF THE MUNICIPAL MCHN PROGRAM CUM MOBILIZATION OF CHT 730,000.00 730,000.00 REPAIR AND IMPROVEMENT OF THE BARANGAY HEALTH CENTERS 1,500,000.00 1,500,000.00 REPAIR AND IMPROVEMENT OF THE MUNICIPAL HEALTH OFFICE AT THE ANNEX BUILDING 2,500,000.00 2,500,000.00 ASSISTIVE DEVICES FOR PERSON WITH DISABILITIES 500,000.00 500,000.00 FUNDING ALLOCATION FOR TECHNICAL EDUCATION FOR DESERVING POOR STUDENTS 500,000.00 500,000.00 LIVELIHOOD PROGRAM FOR VARIOUS SECTOR (PWD, SC, WOMEN/ CSO, PANTAWIF) 2,000,000.00 2,000,000.00 469 SANTA TERESITA - - - 3,255,000.00 1,900,000.00 - 1,292,000.00 - - 2,000,000.00 3,553,000.00 - 500,000.00 - 12,500,000.00 REPAIR ,REHABILITATION AND REPLACEMENT OF CLASSROOMS AND BUILDINGS 2,755,000.00 2,755,000.00 PURCHASE OF ARMCHAIRS AND TABLETS 500,000.00 500,000.00 SALINTUBIG 1,900,000.00 1,900,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 500,000.00 500,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 792,000.00 792,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,000,000.00 2,000,000.00 RURAL MICROENTERPRISES DEV'T PROGRAMS 3,553,000.00 3,553,000.00 TESDA TRAININGS AND SEMINARS 500,000.00 500,000.00 470 SANTO TOMAS 4,300,000.00 - - 6,200,000.00 - - 2,000,000.00 - - - - - - - 12,500,000.00 VARIOUS DA PROJECTS 4,300,000.00 4,300,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT - CATTLE FATTENING DISPERSAL - ORGANIC TRADING POSTS - ORGANIC FERTILIZER PRODUCTION - ABOT ALAM PROGRAM 6,200,000.00 6,200,000.00 MATERNAL NEONATAL CHILD HEALTH AND NUTRITION (MNCHN) 2,000,000.00 2,000,000.00 471 TAAL 3,000,000.00 - - 3,000,000.00 - - 1,958,400.00 - - 3,750,000.00 - - - 791,600.00 12,500,000.00 ESTABLISHMENT OF MARINE PROTECTED AREA 500,000.00 500,000.00 INFASTRUCTURE SUPPORT TO FISHERY (FISHING BOAT ENGINE) 800,000.00 800,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE (TRACTOR) 1,700,000.00 1,700,000.00 REPAIR/REHABILITATION OF CLASSROOM 2,076,100.00 2,076,100.00 PROVISION OF SCHOOL FURNITURE 753,900.00 753,900.00 GULAYAN SA PAARALAN 170,000.00 170,000.00 EQUIPMENT FOR BIRTHING (HOSPITAL BEDS) 538,400.00 538,400.00 MNCHN AND RABIES ELIMINATION TRAININGS 500,000.00 500,000.00 PRIMARY CARE BENEFITS 920,000.00 920,000.00 DRESSMAKING 1,000,000.00 1,000,000.00 BASIC BUSINESS MANAGEMENT, PROJECT MANAGEMENT, AND FINANCIAL MANAGEMENT SKILL TRAINING./SEMINAR 500,000.00 500,000.00 PEANUT BUTTER MAKING 400,000.00 400,000.00 FINANCIAL ASISTANCE FOR INCOME GENERATING PROJECT 500,000.00 500,000.00 SUPLEMENTAL FEEDING MALNOURISHED CHILDREN BELOW3 YEARS OLD 500,000.00 500,000.00 BILIHAN NG MASA 850,000.00 850,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE /REHABILITATION 791,600.00 791,600.00 472 TALISAY 2,200,000.00 - - - 5,676,500.00 - 623,500.00 - - 3,500,000.00 - - 500,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 2,200,000.00 2,200,000.00 FARM IMPLEMENTS - ORGANIC FERTILIZER PRODUCTION OF DEMO FARM - LIVELIHOOD PROGRAM FOR KMMLT - SALINTUBIG PROGRAM 4,176,500.00 4,176,500.00 CONTINGENCY PLANS AND PROGRAMS 1,500,000.00 1,500,000.00 CONSTRUCTION OF HEALTH CENTER 623,500.00 623,500.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 CONSTRUCTION OF PAG-ASA CENTER FOR CICL/ WOMEN CRISIS CENTER PRODUCTION 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 LIVELIHOOD PROGRAM FOR SENIOR CITIZENS AND ASSISTANCE FOR PERSON WITH DISABILITY 500,000.00 500,000.00 TESDA TRAINING PROGRAM 500,000.00 500,000.00 473 TANAUAN CITY 9,500,000.00 - - - - - 3,000,000.00 - - - - - - - 12,500,000.00 ESTABLISHMENT OF TRADING POST FOR ORGANIC AND NON- ORGANIC PRODUCTS 6,500,000.00 6,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FSHERY BUSINESS INVESTMENTS 3,000,000.00 3,000,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 3,000,000.00 3,000,000.00 474 TAYSAN 1,050,000.00 - - - 9,000,000.00 - - - - - - - - 2,500,000.00 12,550,000.00 FARM MACHINERIES 500,000.00 500,000.00 LIVELIHOOD PROJECT - CATTLE DISPERSAL 550,000.00 550,000.00 VARIOUS DILG PROJECTS 9,000,000.00 9,000,000.00 CONSTRUCTION OF EVACUATION CENTER - FLOOD CONTROL - MAINTENANCE OF CORE LOCAL ROAD 2,500,000.00 2,500,000.00 475 TINGLOY - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 TO BE DETERMINED 12,500,000.00 12,500,000.00 476 TUY 3,863,100.00 - - 2,400,000.00 - - 936,900.00 - - 1,800,000.00 1,200,000.00 - - 2,300,000.00 12,500,000.00 VARIOUS DA PROJECTS 3,863,100.00 3,863,100.00 HOG FATTENING - HOG BREEDING - CATTLE DISPERSAL - INFRASTRUCTURE SUPPORT( TRACTOR) - BASIC EDUCATION FACILITIES/FURNITURES 2,180,000.00 2,180,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS GULAYAN SA PAARALAN 220,000.00 220,000.00 MATERNITY AND NEWBORN CARE 936,900.00 936,900.00 REPAIR/UPGRADING OF DAY CARE CENTER 800,000.00 800,000.00 SLP- MICROENTERPIRSE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 GARMENT-BASED LIVELIHOOD PRODUCTS 500,000.00 500,000.00 CASSAVA PROCESSING 700,000.00 700,000.00 INTEGRATED ORGANIC FARMING 900,000.00 900,000.00 CORE LOCAL ROAD CONSTRUCTION 1,400,000.00 1,400,000.00 CAVITE 49,898,215.00 1,500,000.00 6,280,000.00 43,581,000.00 42,930,000.00 2,000,000.00 46,619,785.00 3,500,000.00 3,800,000.00 64,150,000.00 8,330,000.00 - 11,471,000.00 12,440,000.00 296,500,000.00 477 ALFONSO 4,500,000.00 - - 2,500,000.00 2,500,000.00 - 1,500,000.00 - - 1,500,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 4,500,000.00 4,500,000.00 ORGANIC FERTILIZER PRODUCTION - CONSTRUCTION OF SLAUGHTER HOUSE W/ FACILITIES - REPAIR OF CLASSROOMS 1,500,000.00 1,500,000.00 PURCHASE OF ARM CHAIRS 1,000,000.00 1,000,000.00 SALIN TUBIG (IMPROVEMENT OF EXISTING WATER SYSTEM 2,500,000.00 2,500,000.00 IMPROVEMENT OF RHU ( HEALTH FACILITY ENHANCEMENT PROGRAM ) 1,500,000.00 1,500,000.00 CONSTRUCTION OF THERAPY CENTER FOR CHILDREN WITH DISABILITY 1,500,000.00 1,500,000.00 478 AMADEO 5,724,215.00 - 900,000.00 756,000.00 - - 1,519,785.00 - 1,800,000.00 900,000.00 - - 900,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 5,724,215.00 5,724,215.00 IDLE LAND DEVELOPMENT (COFFEE REJUVENATION AND REPLANTING) - CONSTRUCTION OF STW - TRACTOR - MULTI-PURPOSE DRYING PAVEMENT - ORGANIC FERTILIZER PROD. - POST HARVEST FACILITIES - PLANT NURSERY - NATIONAL GREENING PROGRAM 900,000.00 900,000.00 REPAIR OF SCHOOL (ELEM & HS) 630,000.00 630,000.00 GULAYAN SA PAARALAN 126,000.00 126,000.00 RHM PLACEMENT/HIRING, RN HEAL, MNCHN, RABIES CONTROL, DENGUE CONTROL, TB CONTROL, CHT, STI/ HIV/ AIDS 1,519,785.00 1,519,785.00 ECO-TOURISM DEVELOPMENT- ZIPLINE 1,800,000.00 1,800,000.00 MICROENTERPRISE DEVELOPEMENT/IGP 900,000.00 900,000.00 SKILLS DEVELOPMENT ASSISTANCE 900,000.00 900,000.00 479 BACOOR 2,000,000.00 - - 2,800,000.00 3,500,000.00 - 1,200,000.00 - - 600,000.00 1,600,000.00 - 800,000.00 - 12,500,000.00 REHABILITATION OF ORGANIC FISHPOND 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES: REPAIR / REHABILITATION OF CLASSROOMS PROVISION OF SCHOOL FURNITURE 2,800,000.00 2,800,000.00 FLOOD CONTROL PROJECT (CONSTRUCTION OF RIP-RAP) AT ZAPOTE RIVER , CITY OF BACOOR PHASE I CY 2015 3,500,000.00 3,500,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 1,200,000.00 1,200,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF THERAPY CENTER AT GIRL'S HOME) 600,000.00 600,000.00 YAMAN PINOY 600,000.00 600,000.00 OTOP STORE EXPRESS 1,000,000.00 1,000,000.00 COMMUNITY BASE TRAINING 800,000.00 800,000.00 480 CARMONA - - - 2,000,000.00 1,750,000.00 - 2,000,000.00 - - 4,500,000.00 - - 2,250,000.00 - 12,500,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATIONAL/ABOT-ALAM PROGRAM 2,000,000.00 2,000,000.00 SALINTUBIG 1,750,000.00 1,750,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICROENTERPRISE DEVELOPMENT TRACK 3,500,000.00 3,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: EMPLOYMENT FACILITATION TRACK 1,000,000.00 1,000,000.00 VARIOUS TESDA PROJECTS 2,250,000.00 2,250,000.00 TECH/VOC/EDUCATION & SKILLS TRAINING FOR TEACHERS OF K TO 12 - TRAINING FOR WORK SCHOLARSHIP PROGRAM (TWSP) - 481 CAVITE CITY 1,200,000.00 - - 500,000.00 1,450,000.00 - 4,500,000.00 - - 4,850,000.00 - - - - 12,500,000.00 FISH SANCTUARY 600,000.00 600,000.00 INFRASTRUCTURE SUPPORT (FISHING BOAT AND FISH NETS) 600,000.00 600,000.00 BASIC EDUCATION FACILITY (PROVISION OF SCHOOL FURNITURE) 500,000.00 500,000.00 EVACUATION FACILITY 950,000.00 950,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 BOTIKA SA BARANGAY 1,000,000.00 1,000,000.00 HEALTH ENHANCEMENT PROGRAM FOR STREET CHILDREN AND CICL 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 500,000.00 500,000.00 PURCHASE OF MEDICINES (TB0DOTS, ANTI-RABIES VACCINE, SENIOR CITIZENS AND PWDS) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 1,850,000.00 1,850,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING 1,500,000.00 1,500,000.00 TEXTBOOKS FOR DAY CARE CENTERS 500,000.00 500,000.00 482 DASMARINAS 3,000,000.00 - - 2,000,000.00 5,700,000.00 - 8,000,000.00 - - 800,000.00 - - - - 19,500,000.00 ORGANIC FERTLIZER PRODUCTION FOR FOOD PRODUCTION 3,000,000.00 3,000,000.00 EXPANSION OF OPEN HIGH SCHOOL PROGRAM 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 5,700,000.00 5,700,000.00 RIPRAPPING OF EMBANKMENT - EVACUATION FACILITY - RESCUE EQUIPMENT - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TRANSPORT TERMINAL - HEALTH EQUIPMENT 4,000,000.00 4,000,000.00 HEALTH FACILITIES 4,000,000.00 4,000,000.00 CONSTRUCTION OF BAHAY KALINGA BLDG. 800,000.00 800,000.00 483 GENERAL EMILIO AGUINALDO 4,000,000.00 - 2,400,000.00 4,500,000.00 1,100,000.00 - 500,000.00 - - - - - - - 12,500,000.00 IRRIGATION PROJECT (HYDRAULIC RAM PUMP) 2,000,000.00 2,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL PRODUCTION AND DEVELOPMENT 2,000,000.00 2,000,000.00 NATIONAL GREENING PROGRAM 2,400,000.00 2,400,000.00 REPAIR/REHABILITATION OF CLASSROOM AT GEN. E. AGUINALDO NATIONAL HIGH SCHOOL 1,250,000.00 1,250,000.00 REPAIR/REHABILITATION OF CLASSROOMS AT ELEMENTARY SCHOOL 3,250,000.00 3,250,000.00 LOCAL ECONOMIC DEVELOPMENT - PUBLIC MARKET (BAGSAKAN CENTER) 1,100,000.00 1,100,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 484 GENERAL MARIANO ALVAREZ - - - 2,000,000.00 - - 3,000,000.00 - - 6,500,000.00 - - 1,000,000.00 - 12,500,000.00 RENOVATION OF CLASSROMS 2,000,000.00 2,000,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 3,000,000.00 3,000,000.00 LIVELIHOOD PROGRAM, CANDLE-MAKING, TINAPA-MAKING, RAG- MAKING 1,000,000.00 1,000,000.00 VARIOUS DSWD PROJECTS 4,500,000.00 4,500,000.00 EVACUATION CENTERS - CONSTRUCTION OF WOMEN CRISIS CENTERS - BIO INTENSIVE GARDENS FOR THE 27 BRGY & DAYCARES 1,000,000.00 1,000,000.00 TECHNICAL VOCATIONAL PROJECT 1,000,000.00 1,000,000.00 485 GENERAL TRIAS - - - - 4,000,000.00 - 1,700,000.00 - - 6,000,000.00 800,000.00 - - - 12,500,000.00 CONST. OF EVACUATION CENTERS 4,000,000.00 4,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,700,000.00 1,700,000.00 SLP-SEA K-MICRO ENTERPRISE 2,000,000.00 2,000,000.00 VARIOUS DSWD PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF DAY CARE CENTERS - BAHAY PAG-ASA FOR CICL (PHASE 1) - RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 800,000.00 800,000.00 486 IMUS 1,500,000.00 1,500,000.00 - 2,010,000.00 2,500,000.00 - - 1,000,000.00 - 3,750,000.00 - - - 240,000.00 12,500,000.00 REHABILITATION OF EXISTING IRRIGATION SYSTEM 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 FARM IMPLEMENTS (TRACTORS, TRESHERS) 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 310,000.00 310,000.00 PROVISION OS SCHOOL FURNITURES 1,700,000.00 1,700,000.00 RESCUE EQUIPMENT 2,000,000.00 2,000,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 LIVELIHOOD AND INCOME AUGMENTATION PROGRAM FOR INFORMAL SECTOR 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,750,000.00 1,750,000.00 SENIOR CITIZEN CENTER - PHASE 1 & 2 2,000,000.00 2,000,000.00 TO BE DETERMINED 240,000.00 240,000.00 487 INDANG 1,000,000.00 - 1,250,000.00 7,500,000.00 - - 1,250,000.00 - - 1,500,000.00 - - - - 12,500,000.00 TRADING POST 1,000,000.00 1,000,000.00 TREE PLANTING ACTIVITIES 1,250,000.00 1,250,000.00 VARIOUS DEPED PROJECTS 7,500,000.00 7,500,000.00 REHABILITATION OF THE GABALDON SCHOOL BUILDING - REPAIR OF (11) E/S BUILDING - COMFORTABLE CHAIRS/DESKS FOR IN-SCHOOL CHILDREN (12 SCHOOL BUILDING) - TRAINING & HEALTH FACILITIES ENHANCEMENT PROGRAM 1,250,000.00 1,250,000.00 SUSTAINABLE LIVELIHOOD 500,000.00 500,000.00 CAPABILITY BUILDING FOR MSWD STAFFS & PERSONNELS 500,000.00 500,000.00 CONSTRUCTION OF HANDWASHING FACILITIES 500,000.00 500,000.00 488 KAWIT 600,000.00 - 650,000.00 583,000.00 500,000.00 - 2,077,000.00 - - 6,890,000.00 500,000.00 - 700,000.00 - 12,500,000.00 INFRASTRACTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT 600,000.00 600,000.00 PURCHASE OF PULVORIZER, SHREDDER AND MIXER MACHINE 650,000.00 650,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 583,000.00 583,000.00 PROCUREMENT OF SIX(6) WHEELER TRUCK FOR RELIEF RESCUE EQUIPMENT 500,000.00 500,000.00 INFECTIOUS DISEASES: RABIES ELIMINATION 1,227,000.00 1,227,000.00 PURCHASE OF MEDICINE AND EQUIPMENT FOR DISASTER PROGRAM 850,000.00 850,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT-EVACUATION CENTER 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT-CONSTRUCTION OF CICL 2,500,000.00 2,500,000.00 PROTECTIVE SERVICES FOR THE SENIOR CITIZEN 500,000.00 500,000.00 TINDAHANG BAYAN 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-EMPLOYMENT TRACK (RUG AND DOLL MAKING) 750,000.00 750,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MEAT PROCESSING) AND LIVELIHOOD TRAINING PROGRAM 640,000.00 640,000.00 CREDIT ASSITANCE PROGRAM (SPARE & CYCLE PARTS COOP) 500,000.00 500,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) 500,000.00 500,000.00 COMMUNITY BASED TRAINING PROGRAM 700,000.00 700,000.00 489 MAGALLANES 2,250,000.00 - - 1,750,000.00 2,000,000.00 2,000,000.00 - - 2,000,000.00 2,000,000.00 - - 500,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 2,250,000.00 2,250,000.00 EQUIPMENT FOR ORGANIC FERTILIZER - CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT - FEED MILLING FACILITY - BASIC EDUCATION REHABILITATION/REPAIR OF CLASSROOMS 1,750,000.00 1,750,000.00 SLOPE PROTECTION 2,000,000.00 2,000,000.00 ELECTRIFICATION PROGRAM 2,000,000.00 2,000,000.00 CONSTRUCTION OF RESTROOM AND SHOWER ROOM 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF DAY CARE CENTERS WITH COMPLETE FACILITIES 1,000,000.00 1,000,000.00 REPAIR/REHABILITATION OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 TRAINING FOR WORK SCHOLARSHIP PROTECTION 500,000.00 500,000.00 490 MARAGONDON 3,300,000.00 - 1,080,000.00 2,000,000.00 920,000.00 - 700,000.00 - - 3,000,000.00 1,500,000.00 - - - 12,500,000.00 INFRASTRACTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT/INFRASTRUCTURAL SUPPORT FOR SUSTAINABLE AGRICULTURE 3,300,000.00 3,300,000.00 SUSTAINABLE BARANGAY NURSERY FOR GREENING PROGRAM 1,080,000.00 1,080,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION/ABOT -ALAM 1,000,000.00 1,000,000.00 REPAIR OF CLASSROOM AND SCHOOL CANTEEN 500,000.00 500,000.00 REPAIR OF CLASSROOMS, HOME ECONOMICS, AND SCHOOL CLINIC 500,000.00 500,000.00 PURCHASE OF RESCUE AMBULANCE 920,000.00 920,000.00 FREE MEDICAL SERVICES FOR INDIGENT SENIOR CITIZENS 700,000.00 700,000.00 PROTECTIVE SERVICES FOR YOUTH AND CHILDREN 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICROENTERPRISE DEVELOPMENT TRACK/SEA KAUNLARAN PROJECT 2,000,000.00 2,000,000.00 YAMANG PINOY (CANDLE MAKING PRODUCT DEVELOPMENT AND MARKETING) 500,000.00 500,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM/PRODUCT DEVELOPMENT AND TECHNOLOGY PROMOTION (BAMBOO LIVELIHOOD PROJECT) 1,000,000.00 1,000,000.00 491 MENDEZ - - - 300,000.00 - - - - - - - - - 12,200,000.00 12,500,000.00 REPAIR/REHAB.OF SCH.CLASSROOMS 300,000.00 300,000.00 CORE LOCAL ROAD NETWORK 10,700,000.00 10,700,000.00 TO BE DETERMINED 1,500,000.00 1,500,000.00 492 NAIC 2,500,000.00 - - 2,500,000.00 1,000,000.00 - - - - 4,800,000.00 - - 1,700,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 1,300,000.00 1,300,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - MARINE RESERVE AND FISH SANCTUARIES - POST-HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT) 650,000.00 650,000.00 ORGANIC FERTILIZER PRODUCTION 550,000.00 550,000.00 BASIC EDUCATION FACILITIES: REPAIR/ REHABILITATION OF CLASSROOM AND HOME ECONOMICS (H.E. BUILDING) AND PROVISION OF SCHOOL FURNITURES 1,500,000.00 1,500,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ ABOT-ALAM PROGRAM 1,000,000.00 1,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 KAPIT-BISIG LABAN SA KAHIRAPAN COMPREHENSIVE AND INTEGRATED DELIVERY OF SOCIAL SERVICES (KC-NCDDP SUB PROJECT: SOIL PROTECTION, RIPRAP) 3,000,000.00 3,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF WOMEN AND CHILDREN CRISIS CENTER) 1,800,000.00 1,800,000.00 VARIOUS TESDA PROJECTS 1,700,000.00 1,700,000.00 PRIVATE EDUCATION STUDENT FINANCIAL ASSISTANCE (PESFA) - TRAINING FOR WORK SCHOLARSHIP PROGRAM (TWSP) - 493 NOVELETA - - - 1,812,000.00 5,600,000.00 - 2,888,000.00 - - 1,700,000.00 - - 500,000.00 - 12,500,000.00 BASIC EDUCATION FACILITIES 1,812,000.00 1,812,000.00 VARIOUS DILG PROJECTS 5,100,000.00 5,100,000.00 FLOOD CONTROL - EVACUATION FACILITY - CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 INFECTIOUS DISEASES 2,888,000.00 2,888,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - EMPLOYMENT FACILITATION TRACK 1,700,000.00 1,700,000.00 COMMUNITY BASED TRAINING PROGRAM 500,000.00 500,000.00 494 ROSARIO 2,150,000.00 - - 1,000,000.00 2,350,000.00 - 4,800,000.00 - - 500,000.00 700,000.00 - 1,000,000.00 - 12,500,000.00 CORAL REEFORESTATION AND REHABILITATION 1,150,000.00 1,150,000.00 FISHING BOATS WITH FISH NETS 1,000,000.00 1,000,000.00 REPAIR OF SCHOOL BUILDINGS AND CLASSROOMS 1,000,000.00 1,000,000.00 CONSTRUCTION OF FLOOD CONTROL STRUCTURE 2,350,000.00 2,350,000.00 CONSTRUCTION OF ONE (1) BARANGAY HEALTH STATION 2,550,000.00 2,550,000.00 SANITATION/WASH FACILITIES AND HYGIENE PROMOTION 2,250,000.00 2,250,000.00 VIABLE OPPORTUNITIES THROUGH LIVELIHOOD TRAINING PROGRAMS 500,000.00 500,000.00 MICRO-ENTREPRENEUR OPPORTUNITIES 700,000.00 700,000.00 JOB OPPORTUNITIES THROUGH SKILLS ENHANCEMENT 1,000,000.00 1,000,000.00 495 SILANG 7,500,000.00 - - 2,000,000.00 - - 2,500,000.00 1,500,000.00 - 1,000,000.00 - - - - 14,500,000.00 PURCHASE OF TRACTOR, HARVESTER AND THRESHER 3,500,000.00 3,500,000.00 PURCHASE OF MATERIALS, EQUIPMENT FOR ORGANIC FERTILIZER PRODUCTION 1,500,000.00 1,500,000.00 POST - HARVEST FACILITIES & EQUIPMENT 1,500,000.00 1,500,000.00 FARM IMPLEMENTS/ TOOLS 1,000,000.00 1,000,000.00 REPAIR/REHABILITATION OF CLASSROOM 2,000,000.00 2,000,000.00 RABIES ELIMINATION PROGRAM 1,190,000.00 1,190,000.00 RN HEALS AND RURAL HEALTH MIDWIVES PLACEMENT PROGRAM 744,000.00 744,000.00 TB CONTROL PROGRAM 566,000.00 566,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 PADYAK KO KINABUKASAN KO 1,000,000.00 1,000,000.00 496 TAGAYTAY CITY - - - 1,500,000.00 2,890,000.00 - 2,000,000.00 - - 4,610,000.00 1,500,000.00 - - - 12,500,000.00 PROCUREMENT OF SPECIAL TABLES AND CHAIRS FOR SPED CENTER 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS BASIC EDUCATION FACILITIES: PROVISION OF SCHOOL FURNITURE (PROCUREMENT OF ARM CHAIRS) 1,000,000.00 1,000,000.00 FLOOD CONTROL ( CANAL LINING) 2,890,000.00 2,890,000.00 HFEP ( HEALTHY FACILITY ENHANCEMENT PROGRAM )UPGRADING OF HEALTH FACILITIES 2,000,000.00 2,000,000.00 CAPABILITY BUILDING PROGRAM 560,000.00 560,000.00 PROTECTIVE SERVICES (CAPACITY BUILDING ON CHILD AND YOUTH WELFARE PROGRAM ) 1,550,000.00 1,550,000.00 DAY CENTER FOR THE ELDERLY 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) FABRIC CONDITIONER AND DISHWASHING LIQUID-MAKING) 500,000.00 500,000.00 YAMAN PINOY (SUSTAINABLE LIVELIHOOD PROGRAM FOR PERSONS WITH DISABILITY (PWD) PAPER BAG-MAKING; PINEAPPLE; JAM- MAKING; MEAT PROCESSING 1,500,000.00 1,500,000.00 497 TANZA 3,180,000.00 - - 2,200,000.00 - - 4,120,000.00 1,000,000.00 - 2,000,000.00 - - - - 12,500,000.00 VARIOUS BFAR PROJECTS 2,680,000.00 2,680,000.00 ESTABLISHMENT OF FISH PROCESSING FACILITY AND PROCUREMENT OF EQUIPMENTS AND RAWMATERIALS - PROCUREMENT OF 4 UNITS PATROL BOATS W/ACCESSORIES - PROCUREMENT OF 70 UNITS GILL NETS - TRAINING ON FISH PROCESSING - DUCK RAISING CUM SALTED EGG MAKING 500,000.00 500,000.00 PROVISION OF LEARNINGMATERIALS FOR ALS 500,000.00 500,000.00 PROVISION OF CLASSROOM REPAIR/REHABILITATION 1,700,000.00 1,700,000.00 HFEP FOR TB DIAGNOSIS SERVICES 2,490,000.00 2,490,000.00 PURCHASE OF XRAY MACHINE 1,000,000.00 1,000,000.00 CAPABILITY BUILDING 630,000.00 630,000.00 SKILLS TRAINING FOR WORK SCHOLARSHIP PROGRAMS 1,000,000.00 1,000,000.00 IMPROVEMENT/EXTENSION OF TCLC 2,000,000.00 2,000,000.00 498 TERNATE 3,350,000.00 - - - 5,170,000.00 - - - - 2,250,000.00 1,730,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,350,000.00 1,350,000.00 ARTIFICIAL CORAL REEF SANCTUARY - ORGANIC FERTILIZER PRODUCTION - SMALL IRRIGATION PROJECT 2,000,000.00 2,000,000.00 RELOCATION AND EXPANSION OF TERNATE PUBLIC MARKET 5,170,000.00 5,170,000.00 CHILDREN WELFARE PROGRAM 1,250,000.00 1,250,000.00 SKILLS DEVELOPMENT OF FAMILY, OUT OF SCHOOL YOUTH THROUGH HOME-BASED LIVELIHOOD PROJECT 1,000,000.00 1,000,000.00 YAMANG PINOY THROUGH FOOD PROCESS PRODUCTION (PATIS AND BAGOONG ALAMANG) MAKING, TAHONG AND TALABA PROCESSING) 530,000.00 530,000.00 LOCAL REVENUE ECONOMIC DEVELOPMENT (LRED) 500,000.00 500,000.00 HANDICRAFT MAKING THROUGH HOME-BASED LIVELIHOOD PROJECT 700,000.00 700,000.00 499 TRECE MARTIRES CITY 2,144,000.00 - - 1,370,000.00 - - 2,365,000.00 - - 4,500,000.00 - - 2,121,000.00 - 12,500,000.00 ORAGANIC FERTILIZER PRODUCTION 644,000.00 644,000.00 FRUIT TREES SEEDLING DISPERSAL 1,000,000.00 1,000,000.00 SEEDS AND SEEDLINGS DISPERSAL 500,000.00 500,000.00 REHABILITATION OF DILAPIDATED & MAKESHIFT CLASSROOMS 1,250,000.00 1,250,000.00 GULAYAN SA PAARALAN 120,000.00 120,000.00 HFEP: CONSTRUCTION OF BARANGAY HELATH STATION (BEMONC FACILITIES) 2,365,000.00 2,365,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS: CONSTRUCTION OF BAHAY PAG ASA FOR CICL 3,000,000.00 3,000,000.00 PROTECTIVE SERVICE : CAPABILITY BLDG. OF SOCIAL WORKERS ALONG MNGMT. OF DIFFERENT CASES 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM(SLP) - MICRO ENTERPRISE DEV'T TRACK 1,000,000.00 1,000,000.00 VARIOUS TESDA PROJECTS 2,121,000.00 2,121,000.00 TWSP: METAL & ENGINEERING -GAS METAL ARCH WELDING(GMAW) NC II - TWSP: METAL & ENGINEERING-SHIELD METAL ARCH WELDING(SMAW) NC I - TWSP: AUTOMOTIVE SERVICING NC I - TWSP: INFORMATION & COMMUNICATION TECH. (ICT) COMPUTER HARDWARE SERVICING II - TWSP: GARMENTS - DRESSMAKING NC I/TAILORING NC II - LAGUNA 55,831,642.60 - 11,356,600.00 31,006,400.00 86,283,953.10 2,500,000.00 49,468,400.00 2,520,000.00 25,712,635.40 50,688,600.00 35,931,768.90 - 7,200,000.00 16,500,000.00 375,000,000.00 500 ALAMINOS 4,500,000.00 - - - - - 2,000,000.00 2,000,000.00 - 2,000,000.00 2,000,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 4,500,000.00 4,500,000.00 TRADING POST - FARM IMPLEMENTS TOOLS - ORAGANIC FERTILIZER PRODUCTION - CHT MOBILIZATION 2,000,000.00 2,000,000.00 DOLE INTEGRATED LIVELIHOOD PROG. 2,000,000.00 2,000,000.00 SLP-MICROENTERP. DEVT TRACK 2,000,000.00 2,000,000.00 YAMAN PINOY 2,000,000.00 2,000,000.00 501 BAY 1,800,000.00 - - 121,400.00 7,700,000.00 - - - - 1,878,600.00 1,000,000.00 - - - 12,500,000.00 AGRO PROCESSING FACILITIES & EXPANDED AGRI BUSINESS ACTIVITIES 1,800,000.00 1,800,000.00 GULAYAN SA PAARALAN 121,400.00 121,400.00 EVACUATION FACILITY 7,700,000.00 7,700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,878,600.00 1,878,600.00 YAMAN PINOY CATERING SERVICES 1,000,000.00 1,000,000.00 502 BIAN - - - - - - - - - 3,500,000.00 9,000,000.00 - - - 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - SLP 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES AND INFRASTRACTURE PROJECTS 2,500,000.00 2,500,000.00 YAMAN PINOY 9,000,000.00 9,000,000.00 503 CABUYAO - - - - - - 5,000,000.00 - - - - - - 7,500,000.00 12,500,000.00 UPGRADING OF BEMONC FACILITY IN SOUTHVILLE 5,000,000.00 5,000,000.00 TO BE DETERMINED 7,500,000.00 7,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 504 CALAMBA CITY - - - - 1,200,000.00 - 6,000,000.00 - - 3,200,000.00 2,100,000.00 - - - 12,500,000.00 CSO LEADERSHIP FORMATION AND DEVELOPMENT PROGRAM 1,200,000.00 1,200,000.00 RURAL HEALTH FACILITIES ENHANCEMENT PROGRAM 6,000,000.00 6,000,000.00 CASH FOR WASTE PROJECT (PERA PARA SA BASURA) 3,200,000.00 3,200,000.00 CSO SUSTAINABLE LIVELIHOOD PROGRAM 2,100,000.00 2,100,000.00 505 CALAUAN 1,000,000.00 - - 3,000,000.00 3,000,000.00 - - - - 3,000,000.00 - - 1,000,000.00 1,500,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION 1,000,000.00 1,000,000.00 BASIC EDUC REPAIR/REHAB OF CLASSROOMS 3,000,000.00 3,000,000.00 FLOOD CONTROL 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SEA-K) 2,000,000.00 2,000,000.00 CAPACITY BUILDING PROTECTIVE SERVICES 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION 1,500,000.00 1,500,000.00 TRAINING FOR WORK SCHOLARSHIP PROGRAM 1,000,000.00 1,000,000.00 506 CAVINTI 1,836,642.60 - - - 5,518,953.10 - - - 4,512,635.40 - 631,768.90 - - - 12,500,000.00 TRADING POST 1,836,642.60 1,836,642.60 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 5,518,953.10 5,518,953.10 LOCAL TOURISM DEVELOPMENT PROJECT 4,512,635.40 4,512,635.40 YAMAN PINOY 631,768.90 631,768.90 507 FAMY 1,000,000.00 - - - 3,500,000.00 - 4,000,000.00 - - 4,000,000.00 - - - - 12,500,000.00 TRADING POSTS 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 EVACUATION FACILITY - RESCUE EQUIPMENT - FLOOD CONTROL - HEALTH FACILITIES ENHANCEMENT PROGRAM (BARANGAY MAYATBA 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (BRGY. SALANGBATO 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (LSP)- EMPLOYMENT FACILITATION TRACK 4,000,000.00 4,000,000.00 508 KALAYAAN - - 500,000.00 90,000.00 9,660,000.00 - 1,050,000.00 - - 500,000.00 700,000.00 - - - 12,500,000.00 NGP 500,000.00 500,000.00 GULAYAN SA PAARALAN 90,000.00 90,000.00 SALINTUBIG (BRGY. SAN ANTONIO) 4,200,000.00 4,200,000.00 SALINTUBIG (BRGY. SAN JUAN) 4,500,000.00 4,500,000.00 EVACUATION FACILITY 960,000.00 960,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 550,000.00 550,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJ. 500,000.00 500,000.00 YAMAN PINOY LIVELIHOOD 700,000.00 700,000.00 509 LILIW 500,000.00 - 500,000.00 1,590,000.00 3,210,000.00 - 2,300,000.00 - 2,000,000.00 1,000,000.00 700,000.00 - 700,000.00 - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 NATIONAL GREENING PROGRAM (NGP) 500,000.00 500,000.00 GULAYAN SA PAARALAN 90,000.00 90,000.00 BASIC EDUCATION FACILITIES : REPAIR/REHABILITATION 1,500,000.00 1,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 1,460,000.00 1,460,000.00 VARIOUS DILG PROJECTS 1,750,000.00 1,750,000.00 FLOOD CONTROL - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - BASIC EQUIPMENT & INSTRUMENTS (OPB): 700,000.00 700,000.00 CONSTRUCTION OF BRGY HEALTH STATION 1,100,000.00 1,100,000.00 RABIES ELIMINATION 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 YAMAN PINOY 700,000.00 700,000.00 COMMUNITY-BASED TRAINING PROGRAM 700,000.00 700,000.00 510 LOS BAOS 6,000,000.00 - - - 2,900,000.00 - - - - 1,600,000.00 2,000,000.00 - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 1,000,000.00 1,000,000.00 COLD STORAGE FACILITY / VAN 2,000,000.00 2,000,000.00 TRADING POST 3,000,000.00 3,000,000.00 WATER PIPE CONNECTION 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 1,900,000.00 1,900,000.00 PROVISION OF SUPPLIES FOR ECCD 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD DEVELOPMENT PROGRAM FOR 4PS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD DEVELOPMENT PROGRAM 1,000,000.00 1,000,000.00 MICROBIZ INCUBATION AND LIVELIHOOD DEVELOPMENT (ALL SECTORS) 1,000,000.00 1,000,000.00 511 LUISIANA x 3,820,000.00 - - 130,000.00 3,500,000.00 - - - - 1,850,000.00 700,000.00 - 2,000,000.00 500,000.00 12,500,000.00 VARIOUS DA PROJECTS 3,820,000.00 3,820,000.00 TRADING POST - INFRASTRUCTURE SUPPORT TO AGRICULTURE - ORGANIC FERTILIZER PRODUCTION - POST-HARVEST FACILITIES AND EQUIPMENT - GULAYAN SA PAARALAN 130,000.00 130,000.00 RESCUE EQUIPMENT AND OTHER MISCELLANEOUS ITEMS 2,000,000.00 2,000,000.00 CONSTRUCTION OF FOOT BRIDGE 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE 850,000.00 850,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 YAMAN PINOY 700,000.00 700,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 PRIVATE EDUCATION STUDENT FINANCIAL ASSISTANCE (PESFA) 2,000,000.00 2,000,000.00 512 LUMBAN 5,835,000.00 - 1,000,000.00 1,765,000.00 2,000,000.00 - - - - - 1,900,000.00 - - - 12,500,000.00 TRADING POST 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 1,935,000.00 1,935,000.00 INFRASTRUCTURE SUPPORT TO AGRCULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,900,000.00 1,900,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS POST HARVEST FACILITIES AND EQUIPMENT 1,500,000.00 1,500,000.00 NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES: -REPAIR / REHABILITATION OF CLASSROOMS -PROVISION OF SCHOOL FURNITURE 1,765,000.00 1,765,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 2,000,000.00 2,000,000.00 YAMAN PINOY 1,400,000.00 1,400,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM 500,000.00 500,000.00 513 MABITAC 3,950,000.00 - - 1,130,000.00 3,360,000.00 - 3,060,000.00 - - - - - - 1,000,000.00 12,500,000.00 TRADING POST 1,950,000.00 1,950,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN 130,000.00 130,000.00 BASIC EDUCATION FACILITIES: -REPAIR / REHABILITATION OF CLASSROOMS -PROVISION OF SCHOOL FURNITURE 1,000,000.00 1,000,000.00 SALINTUBIG 1,610,000.00 1,610,000.00 FLOOD CONTROL 1,750,000.00 1,750,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (RHU EQUIPMENT) 3,060,000.00 3,060,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 1,000,000.00 514 MAGDALENA 2,420,000.00 - - 5,880,000.00 1,000,000.00 2,000,000.00 - - - - 700,000.00 - 500,000.00 - 12,500,000.00 POST-HARVEST FACILITIES EQUIPMENT (MECHANICAL DRYER) 1,000,000.00 1,000,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 1,420,000.00 1,420,000.00 BASIC EDUCATION FACILITIES: REPAIR/ REHABILITATION OF CLASSROOMS PROVISION OF SCHOOL FURNITURES 5,800,000.00 5,800,000.00 GULAYAN SA PAARALAN 80,000.00 80,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 1,000,000.00 OFF-GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 2,000,000.00 2,000,000.00 YAMAN PINOY 700,000.00 700,000.00 COMMUNITY BASED TRAINING PROGRAM 500,000.00 500,000.00 515 MAJAYJAY - - 5,391,600.00 - - - 2,108,400.00 - 5,000,000.00 - - - - - 12,500,000.00 WASTE MANAGEMENT AND ENVIRONMENTAL PROTECTION 5,391,600.00 5,391,600.00 BASIC EQUIPMENTS FOR MATERNITY AND NEWBORN CARE 538,400.00 538,400.00 FOR TB DOTS PACKAGES 500,000.00 500,000.00 PRIMARY CARE BENEFITS 570,000.00 570,000.00 UPGRADING OF HEALTH FACILITIES IN TERMS OF BUILDING DESIGN 500,000.00 500,000.00 REHABILITATION OF TOURISM FACILITIES AND ADDITIONAL "COME ON" FACILITY 5,000,000.00 5,000,000.00 516 NAGCARLAN - - 715,000.00 1,000,000.00 8,985,000.00 - 500,000.00 - - 1,300,000.00 - - - - 12,500,000.00 IMPROVING ECONOMIC STATUS & BUILDING RESILIENT COMMUNITY TO CLIMATE CHANGE THROUGH AGRO-FORESTRY 715,000.00 715,000.00 OSY SCHOOL BUILDING WITH FURNITURES & ALS BUILDING 1,000,000.00 1,000,000.00 IMPROVEMENT OF MUN. WATER SYSTEM 8,985,000.00 8,985,000.00 BASIC EMERGENCY OBSTETRICS AND NEONATAL CARE MEDICINES, MADICAL SUPPLIES AND MEDICAL EQUIPMENTS 500,000.00 500,000.00 MICRO ECONOMIC ENTERPRISE (LIVELIHOOD PROJECT) 1,300,000.00 1,300,000.00 517 PAETE 2,100,000.00 - - 2,210,000.00 3,250,000.00 - 1,400,000.00 - - 1,540,000.00 - - 1,000,000.00 1,000,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 600,000.00 600,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES: -REPAIR / REHABILITATION OF CLASSROOMS -PROVISION OF SCHOOL FURNITURE 2,210,000.00 2,210,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 2,000,000.00 2,000,000.00 FLOOD CONTROL 1,250,000.00 1,250,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 900,000.00 900,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (PREVENTION & CONTROL OF HUMAN RABIES) 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,540,000.00 1,540,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 1,000,000.00 1,000,000.00 COMMUNITY-BASED TRAINING PROGRAM 1,000,000.00 1,000,000.00 518 PAGSANJAN - - - - 1,500,000.00 - 2,000,000.00 - 3,000,000.00 3,000,000.00 3,000,000.00 - - - 12,500,000.00 SALINTUBIG 1,000,000.00 1,000,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,500,000.00 1,500,000.00 STD/HIV - AIDS PREVENTION 500,000.00 500,000.00 LOCAL TOURSIM DEVELOPMENT PROJECTS 3,000,000.00 3,000,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT 2,500,000.00 2,500,000.00 MICROFINANCING/ RUMICRO ENTERPRISE DEVELOPMENT PROGRAM 3,000,000.00 3,000,000.00 519 PAKIL 3,000,000.00 - - 3,000,000.00 3,500,000.00 - - - 2,000,000.00 1,000,000.00 - - - - 12,500,000.00 AGRI-FISHERY TRAINING 500,000.00 500,000.00 IRRIGATION PROJECT 2,500,000.00 2,500,000.00 REPAIR & REHABILITATION OF CLASSROOMS 3,000,000.00 3,000,000.00 SALINTUBIG 3,000,000.00 3,000,000.00 CONSTRUCTION OF CANAL/DRAINAGE 500,000.00 500,000.00 IMPROVEMENT OF PLAZA ADONAY, PLAZA RIZAL (BULWAGANG IMM) 2,000,000.00 2,000,000.00 SLP EMPLOYMENT FACILITATION TRACK 1,000,000.00 1,000,000.00 520 PANGIL 3,900,000.00 - 750,000.00 - - - 1,100,000.00 - 3,050,000.00 2,000,000.00 700,000.00 - 1,000,000.00 - 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,000,000.00 1,000,000.00 IRRIGATION PROJECTS 1,500,000.00 1,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION DEVELOPMENT 1,400,000.00 1,400,000.00 NATIONAL GREENING PROGRAM 750,000.00 750,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 550,000.00 550,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 550,000.00 550,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 3,050,000.00 3,050,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - EMPLOYMENT FACILITATION TRACK 1,000,000.00 1,000,000.00 YAMAN PINOY 700,000.00 700,000.00 COMMUNITY-BASED TRAINING PROGRAM 1,000,000.00 1,000,000.00 521 PILA 1,000,000.00 - - 3,150,000.00 - - - - 1,150,000.00 5,500,000.00 1,200,000.00 - 500,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 1,000,000.00 1,000,000.00 POST-HARVEST FACILITIES AND EQUIPMENT - ORGANIC FERTILIZER PRODUCTION - BASIC EDUCATION FACILITIES: REPAIR / REHABILITATION OF CLASSROOMS, PROVISION OF SCHOOL FURNITURE 3,000,000.00 3,000,000.00 GULAYAN SA PAARALAN 150,000.00 150,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS 1,150,000.00 1,150,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 500,000.00 500,000.00 SUSTAINABLE LIVIHOOD PROGRAM (SLP) - MICROENTERPRICE DEV. TRACK 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - EMPLOYMENT FACILITATION TRACK 2,000,000.00 2,000,000.00 YAMAN PINOY 1,200,000.00 1,200,000.00 TRAINING FOR WORK SCHOLARSHIP PROGRAM 500,000.00 500,000.00 522 RIZAL 2,240,000.00 - - 3,540,000.00 - - 3,500,000.00 520,000.00 - 2,700,000.00 - - - - 12,500,000.00 IRRIGATION PROJECTS 2,240,000.00 2,240,000.00 BASIC EDUCATION FACILITIES: REPAIR / REHABILITATION OF CLASSROOMS, PROVISION OF SCHOOL FURNITURE 3,000,000.00 3,000,000.00 GULAYAN SA PAARALAN 40,000.00 40,000.00 INNOVATIVE ASSISTANCE TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 500,000.00 500,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 590,000.00 590,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,610,000.00 1,610,000.00 RN HEALS 1,300,000.00 1,300,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 520,000.00 520,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO ENTERPRISE DEVELOPMENT TRACK 2,700,000.00 2,700,000.00 523 SAN PABLO CITY 750,000.00 - 500,000.00 1,600,000.00 1,000,000.00 - 1,750,000.00 - - 3,000,000.00 3,900,000.00 - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 750,000.00 750,000.00 NATIONAL GREENING PROGRAM (NGP) 500,000.00 500,000.00 REPAIR & REHABILITATION OF CLASSROOM 500,000.00 500,000.00 ABOT -ALAM 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 SALINTUBIG 500,000.00 500,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH FACILITIES ENCHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 RN HEALS 750,000.00 750,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS, REPAIR OF DAY CARE CENTERS (2) 500,000.00 500,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS, CONSTRUCTION OF DAY CARE CENTERS (1) 500,000.00 500,000.00 PROTECTIVE SERVICE : CAPACITY BUILDING 2,000,000.00 2,000,000.00 YAMAN PINOY 2,800,000.00 2,800,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 1,100,000.00 1,100,000.00 524 SAN PEDRO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DILG PROJECTS 12,500,000.00 12,500,000.00 CONSTRUCTION OF EVACUATION CENTER - PURCHASE OF RESCUE EQUIPMENT - 525 SANTA CRUZ 4,180,000.00 - - 2,000,000.00 1,000,000.00 - 1,000,000.00 - - 2,620,000.00 700,000.00 - - 1,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,680,000.00 1,680,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOODAND OTHER AGRI-BUSINESSINVESTMENT - TRADING POST 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES 2,000,000.00 2,000,000.00 RESCUE EQUIPMENT 1,000,000.00 1,000,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,120,000.00 1,120,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,500,000.00 1,500,000.00 YAMAN PINOY 700,000.00 700,000.00 CORE LOCAL ROAD CONSTRUCTION 1,000,000.00 1,000,000.00 526 SANTA MARIA - - - - 3,000,000.00 - 4,500,000.00 - 1,500,000.00 500,000.00 1,500,000.00 - 500,000.00 1,000,000.00 12,500,000.00 SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT 2,000,000.00 2,000,000.00 EVACUATION FACILITY 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 RNHEALS 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF WOMEN CRISIS CENTER) 500,000.00 500,000.00 OTOP STORE EXPRESS 500,000.00 500,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TRAINING FOR WORK SCHOLARSHIP PROGRAM 500,000.00 500,000.00 527 SANTA ROSA CITY 1,500,000.00 - - - 2,500,000.00 - - - - 3,000,000.00 2,500,000.00 - - 3,000,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOODAND OTHER AGRI- BUSINESSINVESTMENT 1,500,000.00 1,500,000.00 BRIDGE WIDENING AT BRGY. APLAYA 2,500,000.00 2,500,000.00 SUSTAINABLE LIVELIHOOD PROJECT- MICROENTERPRISE DEVELOPMENT TRACK 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROJECT- RURAL MICROENTERPRISE DEVELOPMENT PROGRAM 2,500,000.00 2,500,000.00 ROAD IMPROVEMENT ALONG LCA BLVD., BRGY. TAGAPO 3,000,000.00 3,000,000.00 528 SINILOAN 1,000,000.00 - 2,000,000.00 - 1,000,000.00 - 5,000,000.00 - 3,500,000.00 - - - - - 12,500,000.00 VARIOUS DA PROJECTS 1,000,000.00 1,000,000.00 POST-HARVEST FACILITIES & EQUIPMENT - TRADING POST - NATIONAL GREENING PROGRAM (NGP) 2,000,000.00 2,000,000.00 FLOOD CONTROL 500,000.00 500,000.00 CAPACITY BUIDING FOR CSO 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 5,000,000.00 5,000,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS 3,500,000.00 3,500,000.00 529 VICTORIA 3,500,000.00 - - 800,000.00 1,500,000.00 500,000.00 3,200,000.00 - - 2,000,000.00 1,000,000.00 - - - 12,500,000.00 IRRIGATION PROJECTS 1,000,000.00 1,000,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 1,500,000.00 1,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVELOPMENT 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES REPAIR/REHABILITATION, PROVISION OF SCHOOL FURNITURE. 800,000.00 800,000.00 EVACUATION FACILITY 1,500,000.00 1,500,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,700,000.00 1,700,000.00 RABIES ELIMINATION 1,500,000.00 1,500,000.00 PROTECTIVE-SERVICES-INFRASTRUCTURE PROJECT 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) EMPLOYMENT FACILITATION TRACK 1,000,000.00 1,000,000.00 YAMAN PINOY 1,000,000.00 1,000,000.00 QUEZON 139,093,980.00 4,750,000.00 8,758,000.00 24,335,000.00 108,108,600.00 1,000,000.00 42,033,985.00 - 9,000,000.00 43,086,120.00 17,670,000.00 - 10,293,000.00 103,821,315.00 511,950,000.00 530 AGDANGAN 4,945,000.00 - - 1,800,000.00 3,250,000.00 - 500,000.00 - - - - - - 2,005,000.00 12,500,000.00 PROCUREMENT OF FARM EQUIPMENTS 1,535,000.00 1,535,000.00 REHABILITATION OF FISH SANCTUARY 510,000.00 510,000.00 LIVELIHOOD PROJECTS FOR WOMEN 2,900,000.00 2,900,000.00 REPAIR OF SCHOOL BUILDINGS AND CONSTRUCTION OF DAYCARE CENTER 1,800,000.00 1,800,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 750,000.00 750,000.00 EXTENSION OF RIPRAP FOR RIVER CONTROL 2,500,000.00 2,500,000.00 REPAIR OF BRGY. HEALTH CENTER WITH BASIC EQUIPMENTS AND INSTRUMENTS 500,000.00 500,000.00 CONCRETING/REHABILITATION OF CORE LOCAL ROAD 2,005,000.00 2,005,000.00 531 ALABAT 6,900,000.00 - - 4,800,000.00 - - - - - - - - - 800,000.00 12,500,000.00 SUPPORT TO FISHERFOLKS 1,300,000.00 1,300,000.00 CONSTRUCTION/ESTABLISHMENT OF POST HARVEST FACILITIES 3,000,000.00 3,000,000.00 AGRI-BUSINESS ACTIVITIES 2,600,000.00 2,600,000.00 REPAIR OF SCHOOL BUILDINGS 4,800,000.00 4,800,000.00 TO BE DETERMINED 800,000.00 800,000.00 532 ATIMONAN 3,800,000.00 - - 1,000,000.00 5,700,000.00 - - - - 2,000,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 1,000,000.00 1,000,000.00 CORAL NURSERY - INFRA SUPPORT TO AFPD (POST HARVEST EQUIPMENT - ESTRABLISHMENT OF MUNICIPAL TRAIDING POST (BAGSAKAN CENTER) - IRRIGATION PROJECT 1,800,000.00 1,800,000.00 AQUA CULTURE (TILAPIA AND BANGUS) 500,000.00 500,000.00 AGRI-FISHERY BUSINESS 500,000.00 500,000.00 REPAIR/REHABILITATION OF CLASSROOM AND PROVISION OF SCHOOL FURNITURE 1,000,000.00 1,000,000.00 PROVISION OF POTABLE WATER 1,700,000.00 1,700,000.00 PROCUREMENT OF RESCUE EQUIPMENT 3,500,000.00 3,500,000.00 CAPACITY BUILDING FOR CSO 500,000.00 500,000.00 REPAIR OF 28 DAY CARE CENTERS 1,000,000.00 1,000,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 1,000,000.00 1,000,000.00 533 BUENAVISTA 1,800,000.00 - - 2,000,000.00 2,500,000.00 - - - - 1,000,000.00 - - 500,000.00 4,200,000.00 12,000,000.00 CARABAO DISPERSAL 800,000.00 800,000.00 ESTABLISHMENT OF ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 PROVISION OF DISC HARROWS & EXTRA TIRES 500,000.00 500,000.00 REPAIR/IMPROVEMENT OF CLASSROOM 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 REPAIR/REHABILITATION OF INTERMITTENT SECTION OF FMR, BRGY. LILUKIN - REPAIR/REHABILITATION OF INTERMITTENT SECTION OF FMR, BRGY. CATULIN - REPAIR/REHAB OF INTERMITTENT SECTION W/ CONCRETING OF CRITICAL SLOPE - FLOOD CONTROL - CONSTRUCTION OF DRAINAGE SYSTEM C/ WOVER - TRAINING W/ WORKING CAPITAL FOR HANDICRAFT PRODUCTION. 500,000.00 500,000.00 TRAINING ON BANANA CHIPS PRODUCTION W/ BUSINESS ESTABLISHMENT 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION /MAINTENANCE/ REHABILITATION 2,000,000.00 2,000,000.00 CONSTRUCTION OF 2.50 KM BARANGAY ROAD 1,200,000.00 1,200,000.00 CORE LOCAL ROAD CONSTRUCTION 1,000,000.00 1,000,000.00 TRAINING ON SEWING W/ PRODUCTION 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 534 BURDEOS 4,550,000.00 1,300,000.00 - 1,900,000.00 2,250,000.00 - 2,500,000.00 - - - - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCT 500,000.00 500,000.00 MECHANICAL DRYER 1,000,000.00 1,000,000.00 DRYING PAVEMENT 500,000.00 500,000.00 CONSTRUCTION OF BARANGAY WHARF 500,000.00 500,000.00 THRESHER TRACTOR 550,000.00 550,000.00 CONSTRUCTION OF IRRIGATION LINE CANAL, BRGY. ALUYON 500,000.00 500,000.00 CONSTRUCTION OF IRRIGATION LINE CANAL, BRGY. CANIWAN 800,000.00 800,000.00 MOTORIZED F/B WITH FISH NET 500,000.00 500,000.00 BOAT WITH FISH NET 500,000.00 500,000.00 MOTORIZED FISHING BOAT 500,000.00 500,000.00 REPAIR OF SCHOOL ROOFING, POBLACION (BCES) 700,000.00 700,000.00 REPAIR OF SCHOOL ROOFING (POBLACION MCHS) 500,000.00 500,000.00 REPAIR OF SCHOOL ROOFING, BRGY. MABINI 700,000.00 700,000.00 WATERWORK SYSTEM 500,000.00 500,000.00 VARIOUS DILG PROJECTS 1,750,000.00 1,750,000.00 CONSTRUCTION OF SEA WALL - CONCRETE PATHWAY, BRGY. CABUGAO - CONCRETE PATHWAY, BRGY. CABUNGALUNAN - CONCRETE PATHWAY, BRGY. PALASAN - RIVER CONTROL - REHABILITATION OF HANGING BRIDGE - CONSTRUCTION OF BHS WITH BIRTHING FACILITY 1,000,000.00 1,000,000.00 MEDICAL EQUIPMENT FOR BHS 500,000.00 500,000.00 MEDICAL EQUIPMENTS FOR BHS 500,000.00 500,000.00 RENOVATION OF BHS WITH BIRTHING FACILITY 500,000.00 500,000.00 535 CALAUAG 3,500,000.00 - - - 2,000,000.00 - 1,800,000.00 - - 2,200,000.00 - - - 3,000,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL AND FISHERY PROGRAM 3,500,000.00 3,500,000.00 PROVISION OF POTABLE WATER SUPPLY 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,800,000.00 1,800,000.00 SUSTAINABLE LIVELIHOOD PROJECTS MICRO ENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 PROTECTION SERVICES -INFRASTRUTURE PROJECT 1,700,000.00 1,700,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - 536 CANDELARIA 3,500,000.00 - - - - - - - 4,500,000.00 4,500,000.00 - - - - 12,500,000.00 AGRO-PROCESSING AND EXPANDED AGRI-BUSINESS ACTIVITIES 3,500,000.00 3,500,000.00 TOURISM FACILITY 4,500,000.00 4,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICROENTERPRISE & EMPLOYMENT FACILITATION TRACK 4,500,000.00 4,500,000.00 537 CATANAUAN 500,000.00 - - - 7,500,000.00 - - - - - 500,000.00 - - 4,000,000.00 12,500,000.00 SUSTAINABLE AGRI-BUSINESS & RURAL ENTERPRISE DEVELOPMENT 500,000.00 500,000.00 (SALINTUBIG) REHABILITATION /EXPANSION OF LEVEL II WATER SUPPLY 2,500,000.00 2,500,000.00 EVACUATION FACILITY 5,000,000.00 5,000,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 REHABILITATION OF 120M BRGY ROAD 1,500,000.00 1,500,000.00 CONSTRUCTION OF 200M ACCESS ROAD TO CATANAUAN PUBLIC MARKET 2,500,000.00 2,500,000.00 538 DOLORES 7,000,000.00 - - 1,200,000.00 2,300,000.00 - 500,000.00 - - - 500,000.00 - - 1,000,000.00 12,500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 1,350,000.00 1,350,000.00 POST-HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT) 2,000,000.00 2,000,000.00 ESTABLISHMENT OF TRADING POST 1,500,000.00 1,500,000.00 VARIOUS BFAR PROJECTS 2,150,000.00 2,150,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - BASIC EDUCATION FACILITIES: -REPAIR / REHABILITATION OF CLASSROOMS 700,000.00 700,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ ABOT-ALAM PROGRAM 500,000.00 500,000.00 ESTABLISHMENT OF TRANSPORT TERMINAL 500,000.00 500,000.00 ESTABLISHMENT OF TOURISM FACILITY (PASALUBONG CENTER) 1,000,000.00 1,000,000.00 ESTABLISHMENT OF SCHOOL COMPUTER LABORATORY 800,000.00 800,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 500,000.00 500,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 CORE LOCAL ROAD TO ECO-PARK AND SANITARY LANDFILL 1,000,000.00 1,000,000.00 539 GENERAL LUNA - - - - - - - - - 1,000,000.00 - - - 11,500,000.00 12,500,000.00 LIVELIHOOD PROJECTS (FOOD PROCESSING, DRESS MAKING) 500,000.00 500,000.00 CONSTRUCTION AND PRODUCTIVITY CENTER 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 8,500,000.00 8,500,000.00 REHABILITATION OF MALAYA-RECTO NIEVA ROAD - REHABILITATION OF NIEVA-VILLARICA-MAGSAYSAY ROAD - REHABILITATION OFCENTRAL B-HACIENDA-BINDOY-BACONG IBABA ROAD - SAN VICENTE-SAN NICOLAS-SUMILANG-NIEVA-LAVIDES ROAD 3,000,000.00 3,000,000.00 540 GENERAL NAKAR 3,100,000.00 - - 1,000,000.00 - 1,000,000.00 2,572,000.00 - - 1,000,000.00 1,600,000.00 - - 2,228,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROVISION OF HAND TRACTORS 1,000,000.00 1,000,000.00 PROVISION OF MOTORIZED FISHING BOATS 600,000.00 600,000.00 CONCRETING OF EARTH CANAL 1,000,000.00 1,000,000.00 SHREDDER MACHINE 500,000.00 500,000.00 REPAIR OF CLASSROOMS 1,000,000.00 1,000,000.00 SITIO ELECTRIFICATION OFF-GRID 1,000,000.00 1,000,000.00 BIRTHING FACILITY 1,300,000.00 1,300,000.00 MALARIA CONTROL PROGRAM 600,000.00 600,000.00 RN HEALS 672,000.00 672,000.00 CONSTRUCTION OF EVACUATION CENTER 1,000,000.00 1,000,000.00 YAMAN PINOY 600,000.00 600,000.00 RURAL MICRO ENTERPRISE DEVELOPEMNT PROJECT 1,000,000.00 1,000,000.00 CONCRETING OF FARM TO MARKET ROAD 1,228,000.00 1,228,000.00 ACCESS ROADS 1,000,000.00 1,000,000.00 541 GUINAYANGAN - - - - - - - - - 1,000,000.00 - - - 11,500,000.00 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 VARIOUS LGSF PROJECTS 7,500,000.00 7,500,000.00 IMPROVEMENT/CONCRETING OF CRITICAL PORTIONS OF ARBISMEN- CAPULUAN CORE- LOCAL ROAD - IMPROVEMENT/CONCRETING OF CRITICAL PORTIONS OF DUNGAWAN-A. MABINI CORE-LOCAL ROAD - CONSTRUCTION OF COASTAL CORE-LOCAL ROAD (TIPAS DIVERSION ROAD) - IMPROVEMENT/CONCRETING OF CRITICAL PORTIONS OF MANGGALANG-SINTONES CORE LOCAL ROAD 4,000,000.00 4,000,000.00 542 GUMACA 2,000,000.00 - - - 4,500,000.00 - 1,400,000.00 - - 2,350,000.00 1,000,000.00 - - 1,250,000.00 12,500,000.00 COCONUT PRODUCTS UTILIZATION 1,000,000.00 1,000,000.00 FISHERMEN PRODUCTIVITY PROJECT 1,000,000.00 1,000,000.00 CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM (FIVE BARANGAYS, 500,000 PER BARANGAY 2,500,000.00 2,500,000.00 CONSTRUCTION OF ADDITIONAL 2ND FLOOR BUILDING OF GUMACA PUBLIC MARKET 2,000,000.00 2,000,000.00 UPGRADING OF SUB-HEALTH STATION BRGY. BAMBAN 700,000.00 700,000.00 UPGRADING OF SUB-HEALTH STATION BRGY. SAN VICENTE 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM MICRO ENTERPRISE DEVELOPMENT TRACK 950,000.00 950,000.00 CONSTRUCTION OF TWO DAY CARE CENTER (2 BARANGAYS, 700,000.00 PER BARANGAY 1,400,000.00 1,400,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 1,000,000.00 1,000,000.00 CONSTRUCTION OF BARANGAY ROAD 1,250,000.00 1,250,000.00 543 INFANTA 4,000,000.00 - 2,000,000.00 - 500,000.00 - 500,000.00 - 2,000,000.00 1,500,000.00 2,000,000.00 - - - 12,500,000.00 SUPPORT TO FISHERY PRODUCTION 500,000.00 500,000.00 FISH SANCTUARY 500,000.00 500,000.00 VARIOUS DA PROJECTS 3,000,000.00 3,000,000.00 POST HARVEST FACILITIES - SUSTAINABLE AGRICULTURE - ORGANIC FERTILIZER PRODUCTION - NATIONAL GREENING PROGRAM 2,000,000.00 2,000,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 EMERGENCY HEALTH MANAGEMENT 500,000.00 500,000.00 ESTABLISHMENT OF EC0-TOURISM FACILITY 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES 500,000.00 500,000.00 SHARED SERVICE FACILITY 500,000.00 500,000.00 RURAL MICROENTERPRISE DEVELOPMENT PROGRAM 1,500,000.00 1,500,000.00 544 JOMALIG 3,750,000.00 - 1,100,000.00 2,250,000.00 1,500,000.00 - 2,150,000.00 - - - - - - 1,750,000.00 12,500,000.00 CORN PRODUCTION 500,000.00 500,000.00 CASSAVA PRODUCTION 500,000.00 500,000.00 SWINE PRODUCTION 500,000.00 500,000.00 FEED FORMULATION 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD . (PURCHASE OF 20 GT BOAT WITH COMPLETE FISHING PARAPHERNALIAS) 1,750,000.00 1,750,000.00 MANGROVE REFORESTATION AND REHABILITATION PROGRAM 1,100,000.00 1,100,000.00 REHABILITATION OF 3CL SCH. BLDG. INCLUDING THE PROVISION OF CR FOR ELEMENTARY PUPILS 750,000.00 750,000.00 REHABILITATION OF 3CL SCH. BLDG. INCLUDING THE PROVISION OF CR FOR JOMALIG NATIONAL HIGH SCHOOL 750,000.00 750,000.00 REHABILITATION OF 3CL SCH. BLDG. INCLUDING THE PROVISION OF CR FOR ELEMENTARY PUPILS 750,000.00 750,000.00 PROVISION OF POTABLE WATER SUPPLY 1,500,000.00 1,500,000.00 ADDITIONAL EQUIPMENT FOR JOMALIG RURAL HEALTH UNIT 858,000.00 858,000.00 CAPACITY BUILDING FOR LGU HEALTH PERSONNEL 500,000.00 500,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 792,000.00 792,000.00 CORE LOCAL ROAD CONTRUCTION ON CRITICAL PORTION FROM SITIO MOROS, BRGY TALISOY TO SITIO PATISAN BRGY BUKAL 1,750,000.00 1,750,000.00 545 LOPEZ 1,400,000.00 950,000.00 - - - - 3,711,600.00 - - - - - - 6,438,400.00 12,500,000.00 INSTALLATION OF MECHANICAL DRYER 800,000.00 800,000.00 PROVISION OF VERMICOMPOSTING FACILITY 600,000.00 600,000.00 INSTALLATION OF IRRIGATION SYSTEM 950,000.00 950,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 927,900.00 927,900.00 CONSTRUCTION OF BARANGAY HEALTH STATION 927,900.00 927,900.00 CONSTRUCTION OF BARANGAY HEALTH STATION 927,900.00 927,900.00 CONSTRUCTION OF BARANGAY HEALTH STATION 927,900.00 927,900.00 VARIOUS LGSF PROJECTS 2,888,400.00 2,888,400.00 CORE LOCAL ROAD - CORE LOCAL ROAD - CORE LOCAL ROAD - CORE LOCAL ROAD - CORE LOCAL ROAD 1,550,000.00 1,550,000.00 CORE LOCAL ROAD 2,000,000.00 2,000,000.00 546 LUCBAN 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TRADING POST 12,500,000.00 12,500,000.00 547 LUCENA CITY 2,000,000.00 - 2,000,000.00 - - - - - - - - - 3,000,000.00 5,500,000.00 12,500,000.00 COMMUNITY BASED ORGANIC FERTILIZER: GULAYAN SA PAARALAN 2,000,000.00 2,000,000.00 ECO SAVERS: TRASH TO CRAFT/TRASH TO CASH 2,000,000.00 2,000,000.00 TO BE DETERMINED 5,500,000.00 5,500,000.00 "HANAPBUHAY SA BARANGAY" ASENSO NG BAYAN 3,000,000.00 3,000,000.00 548 MACALELON 2,288,880.00 - - - 875,000.00 - 7,000,000.00 - - 1,836,120.00 500,000.00 - - - 12,500,000.00 PROCUREMENT AND DISTRIBUTION OF FARMERS EQUIPMENT 1,373,880.00 1,373,880.00 VARIOUS BFAR PROJECTS 915,000.00 915,000.00 PROCUREMENT AND DISTRIBUTION OF FISHERFOLKS EQUIPMENT - LIVELIHOOD - FISH PROCESSING - VARIOUS DILG PROJECTS 875,000.00 875,000.00 PROCUREMENT OF DISASTER EQUIPMENT AND RESCUE OPERATION - TRAINING FOR DISASTER PREPAREDNESS AND AWARENESS - HEALTH FACILITIES ENHANCEMENT PROGRAM 7,000,000.00 7,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,836,120.00 1,836,120.00 LIVELIHOOD - OTOP 500,000.00 500,000.00 549 MAUBAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY (SPRING LEVEL 2/3) - SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY (SPRING LEVEL 1) BRGY. LIWAYWAY AND CAGSIAY - SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY (DEEPWELL LEVEL 1) - 550 MULANAY - - - - 12,450,000.00 - - - - - - - - - 12,450,000.00 INSTALLATION OF WATER RIVER TREATMENT AND POLLUTION CONTROL SYSTEM 1,275,000.00 1,275,000.00 CONSTRUCTION OF MUNICIPAL COMPREHENSIVE DISASTER EVACUATION CENTER, BRGY. BUTANYOG 6,200,000.00 6,200,000.00 CONSTRUCTION OF MUNICIPAL COMPREHENSIVE DISASTER EVACUATION CENTER, BRGY. PATABOG 2,550,000.00 2,550,000.00 CONSTRUCTION OF FLOOD CONTROL, BRGY. BUTANYOG 2,000,000.00 2,000,000.00 CONSTRUCTION OF HANGING BRIDGE, BRGY. BUTANYOG 425,000.00 425,000.00 551 PADRE BURGOS 5,280,000.00 - - 2,635,000.00 - - - - - 1,000,000.00 2,000,000.00 - - 1,585,000.00 12,500,000.00 MARICULTURE LIVELIHOOD PROJECTS 1,280,000.00 1,280,000.00 BOTTOM SET GILL NET 800,000.00 800,000.00 IRRIGATION PROJECTS 3,200,000.00 3,200,000.00 ABOT-ALAM PROGRAM IMPLEMENTATION (SKILL TRAINING PROGRAM) 1,000,000.00 1,000,000.00 REHABILITATION/IMPROVEMENT OF SCHOOL BUILDING AND CONSTRUCTION OF ALS BUILDING 1,635,000.00 1,635,000.00 VARIOUS KC PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTERS - CONSTRUCTION OF SHELTER/REHABILITATION CENTER - CONSTRUCTION OF CRISIS CENTER - YAMAN PINOY PROGRAM 1,000,000.00 1,000,000.00 ESTABLISHMENT OF OTOP STORE EXPRESS (SKILL TRAINING PROGRAM) 1,000,000.00 1,000,000.00 REHABILITATION/IMPROVEMENT OF CORE LOCAL ROAD 1,585,000.00 1,585,000.00 552 PAGBILAO 2,500,000.00 - - - 2,500,000.00 - - - - - - - - 7,500,000.00 12,500,000.00 POST HARVEST FACILITIES 2,500,000.00 2,500,000.00 FLOOD CONTROL 2,500,000.00 2,500,000.00 CORE LOCAL ROAD CONSTRUCTION 7,500,000.00 7,500,000.00 553 PANUKULAN 3,200,000.00 - - - 4,500,000.00 - - - - - - - - 4,800,000.00 12,500,000.00 FISHERY PRODUCTION & DEV'T 1,200,000.00 1,200,000.00 PORTS & WHARVES 1,000,000.00 1,000,000.00 PORTS & WHARVES 1,000,000.00 1,000,000.00 FLOOD CONTROL - 300M- SEA WALL 2,700,000.00 2,700,000.00 FLOOD CONTROL - 135M GROUND PROTECTED 900,000.00 900,000.00 FLOOD CONTROL - 500M- RIVER BANK PROTECTED 900,000.00 900,000.00 CORE LOCAL ROAD - BATO-LIPATA ROAD 4,800,000.00 4,800,000.00 554 PATNANUNGAN 7,740,000.00 500,000.00 - - 1,000,000.00 - 1,000,000.00 - - 1,000,000.00 - - - 1,260,000.00 12,500,000.00 PURCHASE OF SHREDDER - ORGANIC FERTILIZER 500,000.00 500,000.00 ESTABLISHMENT OF FARM NURSERY 500,000.00 500,000.00 CONSTRUCTION OF WATER EMBANKMENT WITH IRRIGATION 500,000.00 500,000.00 SEAWEEDS/FISH NETS DISPERSAL 500,000.00 500,000.00 SEA WEED PLANTING AND ABALON CULTURE 500,000.00 500,000.00 ESTABLISHMENT OF FISH SANCTUARY 500,000.00 500,000.00 EXPANSION/IMPROVEMENT OF MUNICIPAL PORT 2,370,000.00 2,370,000.00 CONSTRUCTION/ INSTALLATION OF SHALLOWTUBE WELL 500,000.00 500,000.00 EXPANSION/IMPROVEMENT OF MUNICIPAL PORT 2,370,000.00 2,370,000.00 REPAIR/IMPROVEMENT OF ROCK CAUSEWAY 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 500,000.00 500,000.00 BASED RADIO WITH HANHELD RADIO 10 UNITS AND MOVER CRAFT 6 PCS, CHAINSAWAND STRETCHER 500,000.00 500,000.00 PROVISION OF OPTA/SURGICAL/DENTAL MISSION TO SENIOR CITIZENS 500,000.00 500,000.00 EXPANSION/IMPROVEMENT OF DAY CARE CENTER 500,000.00 500,000.00 SLP-MICROENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 1,260,000.00 1,260,000.00 CONCRETING OF ROADS - CONCRETING OF ROADS - REPAIR/IMPROVEMENT OF CONCRETE ROAD DAONGAN TO TOWN PROPER - CONCRETING ROAD - CONCRETING OF ROAD - CONCRETING OF ROAD - CONCRETING OF ROAD - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 555 PEREZ - - - - 10,000,000.00 - - - - - - - - 2,500,000.00 12,500,000.00 CONSTRUCTION OF SEA WALL 10,000,000.00 10,000,000.00 CORE LOCAL ROAD DEVELOPMENT CONSTRUCTION BRGY. MAINIT SUR 700,000.00 700,000.00 TO BE DETERMINED 1,800,000.00 1,800,000.00 556 PITOGO 6,500,000.00 - - 1,000,000.00 5,000,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF TRADING POST 6,500,000.00 6,500,000.00 REPAIR/REHABILITATION OF ELEMNTARY AND HIGH SCHOOL CLASSROOMS 1,000,000.00 1,000,000.00 REHABILITATION/EXPANSION/UPGRADING OF LEVEL III WATER SUPPLY SYSTEM 5,000,000.00 5,000,000.00 557 PLARIDEL 3,910,100.00 - - - 2,000,000.00 - - - - - 4,000,000.00 - - 2,589,900.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 3,910,100.00 3,910,100.00 CONSTRUCTION OF EVACUATION FACILITY 2,000,000.00 2,000,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 2,500,000.00 2,500,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM 1,500,000.00 1,500,000.00 CONCRETING OF CORE LOCAL ROADS 2,589,900.00 2,589,900.00 558 POLILLO 1,600,000.00 2,000,000.00 650,000.00 1,000,000.00 1,500,000.00 - 1,550,000.00 - - 2,150,000.00 - - - 2,050,000.00 12,500,000.00 CONSTRUCTION OF IRRIGATION FACILITIES (PHASE I) 2,000,000.00 2,000,000.00 PROVISION OF FISHING GEARS / FISHING BOATS / MOTOR ENGINES 600,000.00 600,000.00 CONSTRUCTION/PROVISION OF PROCESSING PLANT/MINI FEEDMILL FOR LOCAL FEED PRODUCTION 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM 650,000.00 650,000.00 REPAIR/REHABILITATION OF CLASSROMS 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 1,500,000.00 1,500,000.00 ACQUISITION OF LABORATORY EQUIPMENT FOR BLOOD CHEMISTRY 1,000,000.00 1,000,000.00 ACQUISITION OF LABORATORY EQUIPMENT FOR BLOOD CHEMISTRY 550,000.00 550,000.00 CONSTRUCTION OF DAY CARE CENTER 550,000.00 550,000.00 CAPACITY BUILDING FOR DAY CARE WORKERS 500,000.00 500,000.00 TOILET CONSTRUCTION,TRAINING AND PROGRAM MONITORING 550,000.00 550,000.00 SUSTAINABLE LIVELIHOOD PROJECT 550,000.00 550,000.00 SUSTAINED INTEGRATED FOOD PRODUCTION PROGRAM 1,000,000.00 1,000,000.00 CORE LOCAL ROAD (CONCRETING OF CRITICAL PORTIONS OF PINAGLUBAYAN-POBLACION ROAD 1,050,000.00 1,050,000.00 559 QUEZON 6,880,000.00 - 500,000.00 - 2,620,000.00 - 500,000.00 - - 500,000.00 1,000,000.00 - - 500,000.00 12,500,000.00 PROVISION OF MOTORIZED/NON-MOTORIZED BANCA 2,400,000.00 2,400,000.00 PROVISION OF FISH NETS (LARGARETE, PANKIHAN 1,800,000.00 1,800,000.00 PORTS AND WHARVES 500,000.00 500,000.00 PROVISION OF HAND TRACTORS/THRESHERS 960,000.00 960,000.00 CONSTRUCTION OF SIP/STW/DEEP WELL 720,000.00 720,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF WATER SUPPLY SYSTEM-PHASE 1 2,120,000.00 2,120,000.00 RESCUE EQUIPMENT 500,000.00 500,000.00 MNCN SKILLS TRAINING 500,000.00 500,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS 500,000.00 500,000.00 RURAL MICROENTERPRISE DEVELOPMENT PROGRAM 1,000,000.00 1,000,000.00 CORE LOCAL ROAD 500,000.00 500,000.00 560 REAL 1,500,000.00 - 500,000.00 1,000,000.00 3,563,100.00 - 1,936,900.00 - 500,000.00 - 2,500,000.00 - - 1,000,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRI AND FISHERY PRODUCTION 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 BASIC EDUCATION FACILITIES -REPAIR/REHABILITATION OF CLASSROOM 1,000,000.00 1,000,000.00 SALINTUBIG PROJECT 2,000,000.00 2,000,000.00 DRRM RESCUE EQUIPMENT 1,563,100.00 1,563,100.00 HEALTH FACILITIES ENHANCEMENT PROGRAM - BHS 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM - EQUIPMENTS 936,900.00 936,900.00 TOURISM PROGRAM/FACILITIES 500,000.00 500,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM 2,500,000.00 2,500,000.00 CORE LOCAL ROAD PROJECT 1,000,000.00 1,000,000.00 561 SAMPALOC - - - - 1,850,500.00 - 800,000.00 - - 2,000,000.00 1,000,000.00 - - 6,849,500.00 12,500,000.00 TOURISM FACILITY - HERITAGE SITE DEVELOPMENT 1,850,500.00 1,850,500.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 800,000.00 800,000.00 ESTABLISHMENT OF DAY CENTER 2,000,000.00 2,000,000.00 YAMAN-PINOY 1,000,000.00 1,000,000.00 CONSTRUCTION OF ONE LANE CORE LOCAL ROAD 6,849,500.00 6,849,500.00 562 SAN ANDRES 2,500,000.00 - - 1,500,000.00 - - 2,350,000.00 - - 2,500,000.00 - - - 3,650,000.00 12,500,000.00 CATTLE FATTENING 750,000.00 750,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 TRADING POST FOR AGRICULTURE 750,000.00 750,000.00 REHABILITATION OF STAGE AND COVERED COURT 1,500,000.00 1,500,000.00 INTENSIFICATION OF HEALTH PROGRAM 750,000.00 750,000.00 PROCUREMENT OF MEDICAL EQUIPMENTS AND MATERIALS 600,000.00 600,000.00 REHABILITATION OF MAIN HEALTH CENTER 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES FOR CHILDREN AND YOUTH 750,000.00 750,000.00 LIVELIHOOD PROJECT FOR SOCIAL WELFARE 1,750,000.00 1,750,000.00 REHABILITATION OF FARM TO MARKET ROADS 3,650,000.00 3,650,000.00 563 SAN ANTONIO 4,000,000.00 - 508,000.00 - 2,500,000.00 - 1,529,000.00 - - 1,950,000.00 570,000.00 - 1,443,000.00 - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 2,500,000.00 2,500,000.00 POST HARVEST FACILITIES 1,500,000.00 1,500,000.00 NATIONAL GREENING PROGRAM 508,000.00 508,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 EVACUATION FACILITY - EVACUATION FACILITY - EVACUATION FACILITY - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF BRGY. HEALTH STATION 1,008,000.00 1,008,000.00 HEALTH EMERGENCY MANAGEMENT TRAINING 521,000.00 521,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,300,000.00 1,300,000.00 SLP-EMPLOYMENT TRACK 650,000.00 650,000.00 INDUSTRY AND CLUSTERING DEVELOPMENT 570,000.00 570,000.00 VOCATIONAL TECH TRAINING 1,443,000.00 1,443,000.00 564 SAN FRANCISCO (AURORA) 4,000,000.00 - - - - - 4,034,485.00 - - - - - - 4,465,515.00 12,500,000.00 LIVELIHOOD PROJECT - UBE PROCESSING 700,000.00 700,000.00 FARM MACHINERIES 2,000,000.00 2,000,000.00 REHABILITATION OF MARU SANCTUARY 550,000.00 550,000.00 COASTAL MANAGEMENT 750,000.00 750,000.00 BIRTHING FACILITY 3,000,000.00 3,000,000.00 CONSTRUCTION OF SANITARY TOILET 1,034,485.00 1,034,485.00 CORE LOCAL ROAD CONSTRUCTION 4,465,515.00 4,465,515.00 565 SAN NARCISO 4,800,000.00 - - 1,250,000.00 1,750,000.00 - - - - 1,850,000.00 - - 850,000.00 2,000,000.00 12,500,000.00 FARM EQUIPMENT/TOOLS AND IMPLEMENTS 2,600,000.00 2,600,000.00 FISH SANCTUARY AND FISH CAGE 2,200,000.00 2,200,000.00 REHABILITATION OF SCHOOL BUILDING 1,250,000.00 1,250,000.00 VARIOUS DILG PROJECTS 1,750,000.00 1,750,000.00 CONCRETING OF CRITICAL SLOPE - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF DAY CARE CENTER 1,850,000.00 1,850,000.00 CONSTRUCTION OF LOCAL CORE ROAD 2,000,000.00 2,000,000.00 TRAINING FOR LIVELIHOOD PROJECTS 850,000.00 850,000.00 566 SARIAYA 6,300,000.00 - 1,500,000.00 - - - 1,700,000.00 - - 3,000,000.00 - - - - 12,500,000.00 BAYANG MASIKAP PROJECT(CAPACITY BUILDING FOR COOPERATIVE AND AGRICULTURAL EXTENSION WORKERS IN SUPPORT OF CSO LIVELIHOOD DEVELOPMENT) 1,400,000.00 1,400,000.00 HIGH VALUE CROP ENHANCEMENT PROJECT 4,900,000.00 4,900,000.00 WATERSHED/RIVERBANK REHABILITATION PROJECT 1,000,000.00 1,000,000.00 AGROFORESTRY DEVELOPMENT PROJECT 500,000.00 500,000.00 TRAINING AMONG PREGNANT WOMEN AND MOTHERS OF MALNOURISHED CHILDREN ON INFANT AND YOUNG CHILD FEEDING (IYCF). 900,000.00 900,000.00 TRAINING ON GOOD HEALTH AND SANITATION IN 15 BARANGAYS. 800,000.00 800,000.00 PROTECTIVE SERVICE: CAPABILITY BUILDING AND CAPITAL ASSISTANCE FOR PANTAWID PAMILYA BENEFICIARIES 3,000,000.00 3,000,000.00 567 TAGKAWAYAN 2,000,000.00 - - - - - - - - 2,600,000.00 - - - 7,900,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 SLP EMPLOYMENT FACILITATION TRACK 1,000,000.00 1,000,000.00 EXTENSION OF SEAWALL (1) 600,000.00 600,000.00 EXTENSION OF SEAWALL (1) 1,000,000.00 1,000,000.00 VARIOUS LGSF PROJECTS 4,046,971.00 4,046,971.00 CORE LOCAL ROAD CONSTRUCTION - CONSTRUCTION OF 2.460 KM CORE LOCAL ROAD WITH RCPC AND PCCP ON CRITICAL SLOPES - CONSTRUCTION OF 1.68 KM LOCAL CORE ROAD WITH RCPC AND PCCP ON CRITICAL SLOPES 3,853,029.00 3,853,029.00 568 TAYABAS CITY 2,000,000.00 - - - 10,500,000.00 - - - - - - - - - 12,500,000.00 IRRIGATION PROJECT (SIP/STW/OSP) 2,000,000.00 2,000,000.00 FLOOD CONTROL 10,500,000.00 10,500,000.00 569 TIAONG 4,000,000.00 - - - - - 2,000,000.00 - 2,000,000.00 - - - 4,500,000.00 - 12,500,000.00 INFRASTRUCTURE SUPPORT 4,000,000.00 4,000,000.00 RURAL MIDWIFE PLACEMENT 2,000,000.00 2,000,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 2,000,000.00 2,000,000.00 SKILLS AND TALENT DEVELOPMENT PROGRAM 4,500,000.00 4,500,000.00 570 UNISAN 2,850,000.00 - - - 1,000,000.00 - 2,000,000.00 - - 6,150,000.00 500,000.00 - - - 12,500,000.00 PROMOTION AND DEVELOPMENT OF ORGANIC PRODUCTION 600,000.00 600,000.00 VARIOUS BFAR PROJECTS 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 650,000.00 650,000.00 IRRIGATION PROJECT (SIP/STW/OSP) 600,000.00 600,000.00 RESCUE EQUIPMENT 500,000.00 500,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 1,000,000.00 1,000,000.00 PROTECTIVE SERVICE - INFRASTRUCTURE PROJECTS 2,550,000.00 2,550,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - EMPLOYMENT FACILITATION TRACK 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - EMPLOYMENT FACILITATION TRACK 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM 500,000.00 500,000.00 RIZAL 39,666,000.00 - 2,700,000.00 6,922,000.00 12,514,120.00 2,678,000.00 21,255,430.00 21,760,450.00 - 49,384,000.00 11,756,000.00 - 6,764,000.00 2,600,000.00 178,000,000.00 571 ANGONO 1,000,000.00 - - - 3,100,000.00 - 1,000,000.00 4,700,000.00 - 1,500,000.00 - - 700,000.00 500,000.00 12,500,000.00 HOG RAISING, BIGASAN AND HYACINTH PRODUCTION 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 FLOOD CONTROL PROGRAM 2,000,000.00 2,000,000.00 EVACUATION FACILITIES 500,000.00 500,000.00 FIBER RESCUE BOATS 600,000.00 600,000.00 HEALTH FACILITIES 1,000,000.00 1,000,000.00 TANGULAN MASSAGE THERAPY AND FITNESS PROGRAM 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS STRENGTHENING THE CAPACITY OF WORKERS IN THE INFORMAL ECONOMY ON COMBATING FINANCIAL, DISASTER AND CALAMITY CRISIS THRU VARIOUS LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 RTWAND RUG MAKING 500,000.00 500,000.00 RETAIL OUTLET STORE 1,000,000.00 1,000,000.00 GARMENTS PRODUCTION 700,000.00 700,000.00 TODA'S FOOD TERMINAL OUTLET 500,000.00 500,000.00 4PS SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 LIVELIHOOD PROJECT 500,000.00 500,000.00 TO BE DETERMINED 500,000.00 500,000.00 SKILLS DEVELOPMENT PROGRAM THRU "COMMUNITY BASED TECHNICAL AND VOCATIONAL TRAINING FOR OUT-OF-SCHOOL YOUTH 700,000.00 700,000.00 572 BARAS 2,500,000.00 - 500,000.00 1,000,000.00 - - 3,080,000.00 1,920,000.00 - 3,000,000.00 500,000.00 - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 750,000.00 750,000.00 VARIOUS BFAR PROJECTS 1,750,000.00 1,750,000.00 MARINE RESERVE AND FISH SANCTUARY - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - NATIONAL GREENING PROGRAM 500,000.00 500,000.00 BASIC EDUCATION FACILITIES 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,013,650.00 1,013,650.00 RABIES ELIMINATION 792,350.00 792,350.00 RURAL MIDWIFE PLACEMENT PROGRAM 720,000.00 720,000.00 TB CONTROL 554,000.00 554,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) 1,920,000.00 1,920,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO-ENTERPRISE TRACK 1,500,000.00 1,500,000.00 CAPABALITY BUILDING PROJECTS 500,000.00 500,000.00 PROTECTIVE SERVICES -INFRASTRUCTURE PROJECTS 1,000,000.00 1,000,000.00 YAMAN PINOY (BASAHAN MAKING BY WORKERS IN INFORMAL SECTORS) 500,000.00 500,000.00 573 BINANGONAN 4,600,000.00 - - - - - 2,000,000.00 1,000,000.00 - 3,200,000.00 1,700,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 2,100,000.00 2,100,000.00 PURCHASE OF FARM EQUIPMENTS - CONSTRUCTION OF SEMI PORT/WHARF IN BRGY. GULOD, TALIM ISLAND - PURCHASE OF MOTORBOATS AND FISHING GEARS FOR FISHER FOLKS OF BINANGONAN 2,000,000.00 2,000,000.00 BABUYAN, MANUKAN AT KAMBINGAN LIVELIHOD PROGRAM FOR WOMEN 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT TRAINING 800,000.00 800,000.00 RENOVATION OF 6 BARANGAY HEALTH CENTERS 1,200,000.00 1,200,000.00 SMALL SCALE INDUSTRY (GARMENTS BUSINESS) FOR URBAN POOR 1,000,000.00 1,000,000.00 TRAININGS ON SUSTAINABLE LIVELIHOOD PROGRAMS FOR 4PS FAMILIES 700,000.00 700,000.00 SEWING MACHINERIES FOR WOMEN INCLUDING RUG -MAKERS OF BILIBIRAN 500,000.00 500,000.00 CONSTRUCTION OF A BAHAY PAG ASA HALFWAY HOUSE AT SITIO PULONG PARANG 2,000,000.00 2,000,000.00 TRAINING, PRODUCT DEVELOPMENT AND MARKETING OF WATER HYACYNTH (VICTIMS OF DISASTER) 700,000.00 700,000.00 TRAINING, PRODUCT DEVELOPMENT AND MARKETING OF RTW CLOTHES FOR 35 COOPERATIVES 1,000,000.00 1,000,000.00 574 CAINTA 800,000.00 - - 500,000.00 - - 1,000,000.00 5,550,000.00 - 3,450,000.00 700,000.00 - 500,000.00 - 12,500,000.00 DUCK RAISING ANG PROCESSING 800,000.00 800,000.00 PWD INCLUSIVE EDUCATION PROGRAM 500,000.00 500,000.00 BOTIKA NG BAYAN 1,000,000.00 1,000,000.00 VARIOUS DOLE PROJECTS 5,550,000.00 5,550,000.00 CAINTA INTERMUNICIPALITY/CITY TRADE - TIANGGE - SELF EMPLOYMENT AND ENTERPRENEURAL LIVELIHOOD PROJECT (SEEL) FOR THE INFORMAL SECTOR/SMALL BUSINESS SECTOR - VARIOUS LIVELIHOOD PROGRAM - CBBE BASAHAN AND GARMENTS PRODUCTION - OSY COLLECTOR'S ITEMS PRODUCTION - LIVELIHOOD PROJECT 700,000.00 700,000.00 HOMECARE PRODUCTS AND FOOD PROCESSING PROJECT 1,250,000.00 1,250,000.00 LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 COOPERATIVE HOMECARE PRODUCT DEVELOPMENT TRAINING 700,000.00 700,000.00 PWD TRAINING CUM PRODUCTION ON ELECTRONIC REPAIRS 500,000.00 500,000.00 575 CARDONA 5,870,000.00 - - 522,000.00 4,012,120.00 - 555,430.00 1,040,450.00 - 500,000.00 - - - - 12,500,000.00 MOTORIZED FISHING BOAT 800,000.00 800,000.00 5 MOTORIZED FISHING BOAT, FISHING NETS OR GIL NETS (ALL KIND OF FISHING NET) 570,000.00 570,000.00 CONSTRUCTION OF WHARF 4,500,000.00 4,500,000.00 SPED-SPECIAL EDUCATION & OPEN HIGH SCHOOL 522,000.00 522,000.00 CONSTRUCTION OF PERMANENT EVACUATION CENTER 4,012,120.00 4,012,120.00 CONTROL OF INFECTIOUS DISEASES (TB, RABIES, DENGUE) 555,430.00 555,430.00 VULCANIZING & MACHINE SHOP 530,750.00 530,750.00 MICRO-ENTREPRISE FOR FISHPORT VENDORS (FISHING SUPPLY) 509,700.00 509,700.00 BIGASANG PAMBARANGAY 500,000.00 500,000.00 576 CITY OF ANTIPOLO 500,000.00 - 900,000.00 2,000,000.00 - - 1,000,000.00 - - 11,100,000.00 - - - - 15,500,000.00 ORGANIC FARMING SEMINAR 500,000.00 500,000.00 REFORESTATION 900,000.00 900,000.00 REHABILITATION OF SPED CENTER 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS DISTRIBUTION OF TOILET BOWL 500,000.00 500,000.00 REPAIR AND REHAB OF HEALTH CENTER 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 10,100,000.00 10,100,000.00 SKILLS TRAINING 1,000,000.00 1,000,000.00 577 JALAJALA 5,250,000.00 - 500,000.00 - 500,000.00 - 1,200,000.00 - - 4,550,000.00 - - 500,000.00 - 12,500,000.00 UPGRADING OF RICE MILL 3,500,000.00 3,500,000.00 PURCHASE OF NON-MOTORIZED FISHING BOAT TO POOR FISHERFOLKS 900,000.00 900,000.00 GILLNET DISTRIBUTION TO MEMBERS OF FARMC 850,000.00 850,000.00 MANGROVE TREES PLANTATION ALONG LAKESHORE AND WATERWAYS 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY TO FUR FLUNG AREAS 500,000.00 500,000.00 MATERNAL AND NEWBORN PACKAGE FOR PREGNANT WOMEN 600,000.00 600,000.00 PURCHASE OF MEDICINES FOR POOR SENIOR CITIZENS AND PERSON WITH DISABILITIES 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SEWING MACHINE) FOR FEDERATION OF WOMENS CLUB 600,000.00 600,000.00 CONSTRUCTION OF MSWD PROTECTIVE CRISIS CENTER FOR WOMEN, SENIOR CITIZEN, PWD AND CHILDREN IN CRISIS 3,450,000.00 3,450,000.00 PROTECTIVE CAPABILITY TRAINING FOR SOCIAL WORKERS AND DAYCARE WORKERS 500,000.00 500,000.00 YOUTH TRAINING FOR WORK SCHOLARSHIP PROGRAM 500,000.00 500,000.00 578 MORONG 1,800,000.00 - - 400,000.00 1,700,000.00 - 1,500,000.00 - - 1,500,000.00 3,000,000.00 - 1,900,000.00 700,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION (DA-14) 800,000.00 800,000.00 SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (DA02) 1,000,000.00 1,000,000.00 ABOT ALAM PROGRAM (DEP ED-03) 400,000.00 400,000.00 SALINTUBIG-SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT (PROVISION OF POTABLE WATER SUPPLY) 1,000,000.00 1,000,000.00 RESCUE EQUIPMENT 700,000.00 700,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (DOH 13) 1,000,000.00 1,000,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM (DOH-12) 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER (DSWD-04) 1,500,000.00 1,500,000.00 YAMAN PINOY (DTI 2) 2,000,000.00 2,000,000.00 RURAL MICRO ENT. DEVELOPMENT (DTI 3) 1,000,000.00 1,000,000.00 LOCAL ROAD CONSTRUCTION (DILG-03) 700,000.00 700,000.00 VARIOUS TESDA PROJECTS 1,900,000.00 1,900,000.00 COMMUNITY BASED TRAINING PROGRAM - COMMUNITY BASED TRAINING PROGRAM - TRAINING FOR WORK SCHOLARSHIP PROGRAM (TWSP) - 579 PILILLA 5,230,000.00 - - 1,000,000.00 540,000.00 500,000.00 1,130,000.00 - - 2,040,000.00 660,000.00 - - 1,400,000.00 12,500,000.00 CONSTRUCTION OF BAHAY PULUNGAN 500,000.00 500,000.00 NATIONAL RICE PROGRAM ( PURCHASE OF STWAND RUBBER HOSE) 500,000.00 500,000.00 NATIONAL FISHERIES PROGRAM (PURCHASE OF FISH NETS) 540,000.00 540,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 PURCHASE OF MOTORIZED FISHING BOATS 1,150,000.00 1,150,000.00 PURCHASE OF UTENSILS FOR PIA PROCESSING 500,000.00 500,000.00 PURCHASE OF MULTI FIBER DECORTICATING MACHINE 500,000.00 500,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT 540,000.00 540,000.00 PROMOTION AND DEVELOPMENT OF ORGANIC PRODUCTION 500,000.00 500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 ABOT ALAM PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF ARTESIAN WELL 540,000.00 540,000.00 SITIO ELECTRIFICATION PROGRAM 500,000.00 500,000.00 PURCHASE OF TB MEDICATIONS FOR CHILDREN AND PPD FOR DIAGNOSTIC PURPOSES OF TB IN CHILDREN 500,000.00 500,000.00 PURCHASE/PROCUREMENT OF EQUIPMENTS AND MEDICINES FOR BEMONC 630,000.00 630,000.00 CONSTRUCTION OF DAY CARE 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE 500,000.00 500,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS 540,000.00 540,000.00 LIVELIHOOD PROGRAM FOR INDIGENT FAMILY 500,000.00 500,000.00 LRED 660,000.00 660,000.00 VARIOUS LGSF PROJECTS 1,400,000.00 1,400,000.00 CONCRETING OF MANSANAS FEEDER ROAD - CONCRETING OF MASANTOL FEEDER ROAD - CONCRETING OF MABIYA FEEDER ROAD - 580 RODRIGUEZ (MONTALBAN) 2,236,000.00 - - - 1,200,000.00 - 2,120,000.00 - - 3,040,000.00 2,440,000.00 - 1,464,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 2,236,000.00 2,236,000.00 ORGANIC FERTILIZER PRODUCTION - POST-HARVEST FACILITIES AND EQUIPMENT (FARMERS) - TRAMLINES - POST-HARVEST FACILITIES AND EQUIPMENT (4PS) - RESCUE EQUIPMENT (AMBULANCE) 1,200,000.00 1,200,000.00 CAPACITY TRAINING FOR INDIGENOUS ON TRADITIONAL AND ALTERNATIVE HEALTH CARE 520,000.00 520,000.00 CAPACITY/AWARENESS FOR TEENAGER ON STI, HIV AND AIDS 520,000.00 520,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 520,000.00 520,000.00 TRAININGS FOR FUNERAL PARLOR BUSINESS 560,000.00 560,000.00 REPAIR AND PURCHASE OF FACILITIES FOR WOMEN SHELTER 800,000.00 800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 640,000.00 640,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)- EMPLOYMENT FACILITATION TRACK (TRAINING CUM PRODUCTION) 800,000.00 800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM MICRO-ENTERPRISE DEVELOPMENT TRACK 800,000.00 800,000.00 YAMAN PINOY-ENTREPRENEURIAL TRAINING AND PLANNING FOR ORGANIZATIONAL DEVELOPMENT WORKSHOP 720,000.00 720,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 520,000.00 520,000.00 OTOP STORE EXPRESS 1,200,000.00 1,200,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS COMMUNITY-BASED TRAINING AND ENTERPRISE DEVELOPMENT PROGRAM 1,464,000.00 1,464,000.00 581 SAN MATEO 2,500,000.00 - - - - - 2,050,000.00 2,250,000.00 - 3,500,000.00 1,000,000.00 - 1,200,000.00 - 12,500,000.00 PURCHASE OF TRACTOR 2,000,000.00 2,000,000.00 MILK PROCESSING 500,000.00 500,000.00 MEDICINE FOR MENTALLY HANDICAP AND OTHER CASES AND BEDRIDDEN SENIOR 1,500,000.00 1,500,000.00 RABIES ELIMINATION 550,000.00 550,000.00 GARMENTS PRODUCTION 500,000.00 500,000.00 PRODUCTION ON RUG AND SHOE MAKING, FOOD PROCESSING AND HOMECARE PRODUCTS 1,750,000.00 1,750,000.00 SUSTAINABLELIVELIHOOD PROGRAM (HOMECARE PRODUCTS, RUG MAKING AND RECYCLING) 1,500,000.00 1,500,000.00 BIGASANG BAYAN 1,000,000.00 1,000,000.00 GARMENTS PRODUCTION 1,000,000.00 1,000,000.00 YAMAN PINOY, A COMMUNITY LEVEL CAPABILITY/LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 TRAINING FOR WORK SCHOLARSHIP PROGRAM 1,200,000.00 1,200,000.00 582 TANAY 3,140,000.00 - 800,000.00 800,000.00 962,000.00 2,178,000.00 2,120,000.00 - - 2,000,000.00 500,000.00 - - - 12,500,000.00 CONSTRUCTION OF FISH PEN 1,120,000.00 1,120,000.00 VARIOUS DA PROJECTS 2,020,000.00 2,020,000.00 CATTLE DISPERSAL - GOAT RAISING - PURCHASE OF RICE HARVESTER - PURCHASE OF ONE UNIT TRACTOR - NATIONAL GREENING PROGRAM 800,000.00 800,000.00 REPAIR/IMPROVEMENT OF SCHOOLS 800,000.00 800,000.00 SALINTUBIG 962,000.00 962,000.00 OFF-GRID ELECTRIFICATION 2,178,000.00 2,178,000.00 VARIOUS HFEP PROJECTS 1,500,000.00 1,500,000.00 IMPROVEMENT OF BRGY HEALTH CENTER - PROVICION OF MEDICAL EQUIPMENT - UPGRADING OF LABORATORY AND X-RAY SERVICES - ANTI-RABIES PROGRAM 620,000.00 620,000.00 CONSTRUCTION OF WOMEN'S CRISIS CENTER 2,000,000.00 2,000,000.00 YAMAN PINOY & SKILLS AND INDUSTRY PRODUCTION DEVELOPMENT 500,000.00 500,000.00 583 TAYTAY 2,700,000.00 - - - 500,000.00 - - 5,300,000.00 - 4,000,000.00 - - - - 12,500,000.00 FISHERY SECTOR - FISHERY SUPPORT PROGRAM 1,000,000.00 1,000,000.00 FARMERS SECTOR SUPPORT PROGRAM 1,700,000.00 1,700,000.00 DRR TRAINING 500,000.00 500,000.00 WORKERS IN THE INFORMAL SECTOR/WOMEN 5,300,000.00 5,300,000.00 CONSTRUCTION OF BAHAY PAG-ASA 2,500,000.00 2,500,000.00 IMPROVEMENT OF OSCA FACILITIES 1,500,000.00 1,500,000.00 584 TERESA 1,540,000.00 - - 700,000.00 - - 2,500,000.00 - - 6,004,000.00 1,256,000.00 - 500,000.00 - 12,500,000.00 REHABILITATION/REPAIR OF FARM EQUIPMENT & OTHER PROVISION OF SUPPORT FACILITIES 640,000.00 640,000.00 FARM MECHANIZATION 900,000.00 900,000.00 PROVISION OF SCHOOL FURNITURE 700,000.00 700,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,500,000.00 2,500,000.00 VARIOUS KC PROJECTS 4,276,000.00 4,276,000.00 REPAIR / UPGRADING OF 10 DAY CARE CENTERS AND CONSTRUCTION OF GROUP DISHWASHING FACILITY- - CONSTRUCTION OF DAY CARE CENTER - PANTAWID LIVELIHOOD PROJECT: BIGASAN NG BARANGAY - PANTAWID 728,000.00 728,000.00 HOME OWNERS LIVELIHOOD PROGRAM 500,000.00 500,000.00 LIVELIHOOD PROJECT OF SENIOR CITIZENS 500,000.00 500,000.00 YAMAN PINOY: FOOD PROCESSING AND TRAINING LIVELIHOOD PROJECT FOR PANTAWID BENEFICIARIES 756,000.00 756,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT PLAN 500,000.00 500,000.00 COMMUNITY BASED TRAINING PROGRAM 500,000.00 500,000.00 REGION IV-B 209,781,519.29 1,000,000.00 10,000,000.00 54,487,051.39 366,153,433.49 9,916,500.00 60,687,373.91 5,247,316.00 27,431,151.52 96,684,956.29 22,975,312.51 4,840,887.78 13,025,497.82 85,269,000.00 967,500,000.00 MARINDUQUE 10,072,300.00 - - 9,215,000.00 21,195,500.00 - 17,417,200.00 - 3,000,000.00 8,050,000.00 1,500,000.00 - 1,800,000.00 2,750,000.00 75,000,000.00 585 BOAC 1,774,000.00 - - 1,300,000.00 3,004,000.00 - 1,972,000.00 - 3,000,000.00 650,000.00 - - 800,000.00 - 12,500,000.00 SMALL SCALE IRRIGATION PROJECT 1,274,000.00 1,274,000.00 PROVISION OF MOTORIZED FISHING BOAT 500,000.00 500,000.00 BALIK ESKWELA PROGRAM (ALS) 1,300,000.00 1,300,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) 2,004,000.00 2,004,000.00 VARIOUS DILG PROEJCTS 1,000,000.00 1,000,000.00 RETROFITTING OF EVACUATION CENTER / CONSTRUCTION OF EVACUATION CENTER - TRANSPORT TERMINAL - MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 820,000.00 820,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM (RHMPP) 1,152,000.00 1,152,000.00 LAYLAY MAGNETIC STATION HISTORICO-CULTURAL TOURISM DEVELOPMENT PROGRAM (PHASE 1) 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) EMPLOYMENT 650,000.00 650,000.00 SKILLS TRAINING FOR OSY 800,000.00 800,000.00 586 BUENAVISTA 1,648,300.00 - - 525,000.00 6,851,500.00 - 2,875,200.00 - - 600,000.00 - - - - 12,500,000.00 REPAIR OF SMALL IRRIGATION PROJECT 648,300.00 648,300.00 LIVELIHOOD ASSISTANCE (MUSHROOM CULTURE, FISH PROCESSING, FOOD PROCESSING, MEAT PROCESSING) 1,000,000.00 1,000,000.00 ACQUISITION OF SCHOOL FURNITURES 525,000.00 525,000.00 EXPANSION OF POTABLE WATER (LEVEL II) SYSTEM 2,851,500.00 2,851,500.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 CONSTRUCTION OF 3 UNITS EVACUATION CENTER - CONSTRUCTION OF FLOOD CONTROL (RIPRAPING) 500,000.00 500,000.00 IMPROVEMENT OF RURAL HEALTH UNIT (RHU) 1,800,000.00 1,800,000.00 REPAIR OF BARANGAY HEALTH STATION (BHS) 1,075,200.00 1,075,200.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF DAY CARE CENTER 600,000.00 600,000.00 587 GASAN 3,150,000.00 - - 3,000,000.00 1,050,000.00 - 2,500,000.00 - - 2,800,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,150,000.00 3,150,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (PROVISION OF MOTORIZED FISHING BOAT) - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (PROVISION FOR FISH NETS) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-BUSINESS INVESTMENT - FARM IMPLEMENTS (PROVISION OF SMALL FARM IMPLEMENTS) - AGRI-FISHERIES TRAINING - BASIC EDUCATION FACILITIES (REPAIR/ REHABILITATION OF SCHOOL FACILITIES) 3,000,000.00 3,000,000.00 SALINTUBIG - PROVISION OF POTABLE WATERSUPPLY 550,000.00 550,000.00 SALINTUBIG - PROVISION OF POTABLE WATERSUPPLY 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,500,000.00 2,500,000.00 PROTECTIVE SERVICES-INFRA PROJECTS (CONSTRUCTION OF WOMEN CRISIS CENTER) 1,800,000.00 1,800,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING (CONTINUOUS CAPACITY BUILDING OF DAY CARE WORKERS AND PES WORKERS) 500,000.00 500,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING (PROVISION OF ECCD LEARNING MATERIALS FOR DCCS AND SUPERVISED NEIGHBORHOOD PLAYGROUPS) 500,000.00 500,000.00 588 MOGPOG 1,500,000.00 - - 500,000.00 4,000,000.00 - 3,000,000.00 - - 1,000,000.00 1,000,000.00 - 1,000,000.00 500,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PRODUCTION - PURCHASE OF MECHANICAL DRYERS - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION (PROVISION OF MOTORIZED FISHING BOATS AND FISHING NETS) - INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 3,000,000.00 3,000,000.00 EVACUATION FACILITY 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 3,000,000.00 3,000,000.00 CONSTRUCTION OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 YAMAN PINOY 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/ REHABILITATION - TRAINING FOR REFLEXOLOGY THERAPUTIC MASSAGE, BEAUTY CULTURE 1,000,000.00 1,000,000.00 589 SANTA CRUZ 1,100,000.00 - - 1,300,000.00 5,540,000.00 - 1,560,000.00 - - 1,000,000.00 500,000.00 - - 1,500,000.00 12,500,000.00 VARIOUS PROJECTS 1,100,000.00 1,100,000.00 MARINE RESERVE AND FISH SANCTUARIES - POST-HARVEST FACILITIES - MULTI-PURPOSE DRYING PAVEMENT - IRRIGATION PROJECTS - PROVISION OF SHALLOWTUBE WELL PUMP - FISHERY DEVELOPMENT PROJECT - PURCHASE OF MOTORIZED BANCA AND FISHING NET) - MARINE PROTECTED AREAS (PURCHASE OF PATROL BOAT) - REPAIR OF CLASSROOMS 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN PROGRAM 300,000.00 300,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 1,500,000.00 1,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 EVACUATION FACILITY 1,500,000.00 1,500,000.00 CAPACITY BUILDING FOR CSOS - VIGILANCE TO VOUNTEERISM PROGRAM 540,000.00 540,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 560,000.00 560,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-EMPLOYMENT FACILITATION TRACK (SOUVENIR BAG MAKING, SWEET DELICACIES MAKING, DRESSMAKING AND TAILORING) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICRO-ENTERPRISE DEVELOPMENT TRACK SOURVENIE 500,000.00 500,000.00 YAMAN PINOY (FOOD PROCESSING OF BIGAS LINGA AND MONGO) 500,000.00 500,000.00 CORE LOCAL ROAD REHABILITATION (BARANGAY ROAD) 500,000.00 500,000.00 CORE LOCAL ROAD REHABILITATION (PROVINCIAL ROAD) 1,000,000.00 1,000,000.00 590 TORRIJOS 900,000.00 - - 2,590,000.00 750,000.00 - 5,510,000.00 - - 2,000,000.00 - - - 750,000.00 12,500,000.00 VARIOUS DA PROJECTS 900,000.00 900,000.00 PROVISION OF FARM MACHINERIES AND EQUIPMENT (6 UNITS HAND TRACTORS) - ESTABLISHMENT OF SWINE MULTIPLIER FARM - ESTABLISHMENT OF CHICKEN MULTIPLIER FARM - REHABILITATION OF IRRIGATION SYSTEM - REHABILITATION OF VARIOUS SCHOOL BUILDINGS 2,090,000.00 2,090,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 REHABILITATION OF WATER SYSTEM (50M) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS DILG PROJECTS 250,000.00 250,000.00 CONSTRUCTION OF LINE CANAL/DRAINAGE SYSTEM - CONSTRUCTION OF TRANSPORT TERMINAL - PROCUREMENT OF UTZ (ULTRASOUND MACHINE) 1,200,000.00 1,200,000.00 CONSTRUCTION OF NEWBRGY. HEALTH STATION 960,000.00 960,000.00 PROCUREMENT OF X-RAY MACHINE 850,000.00 850,000.00 TRAINING ON MANAGEMENT OF ANIMAL BITES AND ORIENTATION OF ANIMAL BITES FOR CENTER STAFF 500,000.00 500,000.00 REHABILITATION OF BARANGAY HEALTH STATION 500,000.00 500,000.00 REHABILITATION OF BARANGAY HEALTH STATION 500,000.00 500,000.00 CONTROL OF NON-COMMUNICABLE DISEASES (PURCHASE OF 3 IN 1 DIAGNOSTIC APPARATUS AND STRIPS AND CONDUCT OF PEN TRAINING OF HEALTH PERSONNEL 500,000.00 500,000.00 PROVISION OF SANITARY TOILET FACILITIES 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (LIVELIHOOD TRAINING FOR OSYS, WOMENT) 500,000.00 500,000.00 CONSTRUCTION OF LOCAL ACCESS ROAD 750,000.00 750,000.00 OCCIDENTAL MINDORO 35,165,974.53 - 2,500,000.00 6,080,000.00 57,424,787.54 - 7,548,000.00 - 3,500,000.00 17,626,737.64 602,612.51 2,840,887.78 3,200,000.00 18,011,000.00 154,500,000.00 591 ABRA DE ILOG 2,500,000.00 - - - 10,000,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF SMALL IMPOUNDING STRUCTURES AND SHALLOWTUBE WELL 1,300,000.00 1,300,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT (MPDP) 1,200,000.00 1,200,000.00 VARIOUS WATER PROJECTS 10,000,000.00 10,000,000.00 REHABILITATION/EXPANSION OF LEVEL III & LEVEL II WATER SUPPLY SYSTEM - EXPANSION/UPGRADING OF LEVEL III POTABLE WATER SUPPLY SYSTEM - CONSTRUCTION OF LEVEL II AND LEVEL I WATER SUPPLY SYTEM FOR INDIGENOUS PEOPLES - CONSTRUCTION OF OF LEVEL I &II WATER SUPPLY SYSTEM INCLUDING APPROPRIATE WATER TREATMENT SYSTEM - EXPANSION/UPGRADING OF LEVEL III WATER SUPPLY SYSTEM - 592 CALINTAAN 5,500,000.00 - - 2,500,000.00 3,500,000.00 - - - - 1,000,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 5,500,000.00 5,500,000.00 SUSTAINABLE AGRI - FISHERY BASED LIVELIHOOD AND OTHER AGRI - FISHERY BUSINESS INVESTMENTS - COMMUNITY SEED BANKING - REHABILITATION OF DAGUPAN - POBLACION IRRIGATION SYSTEM - CONSTRUCTION OF FISH PORT - MUSHROOM PRODUCTION AND PROCESSING FACILITIES - CONSTRUCTION OF MULTI-PURPOSE PAVEMENT - INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 500,000.00 500,000.00 REPAIR OF SCHOOL BUILDING 2,000,000.00 2,000,000.00 PROVISION OF RESCUE VEHICLE TO 7 BARANGAYS 3,500,000.00 3,500,000.00 REPAIR/UPGRADE OF SENIOR CITIZEN CENTER 1,000,000.00 1,000,000.00 593 LOOC - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 CONSTRUCTION OF POTABLE WATER SUPPLY (LEVEL 2 ) - CONSTRUCTION OF POTABLE WATER SUPPLY (LEVEL 2 ) - CONSTRUCTION OF POTABLE WATER SUPPLY (LEVEL 2 ) - CONSTRUCTION OF POTABLE WATER SUPPLY (LEVEL 2 ) - CONSTRUCTION OF POTABLE WATER SUPPLY (LEVEL 2 ) - CONSTRUCTION OF POTABLE WATER SUPPLY (LEVEL 2 ) - CONSTRUCTION OF POTABLE WATER SUPPLY (LEVEL 2 ) - 594 LUBANG - - - - 12,000,000.00 - - - - 500,000.00 - - - - 12,500,000.00 CONSTRUCTION OF LEVEL II KALSADA-KAYSAMEON WEST LIBIS WATER SYSTEM 6,300,000.00 6,300,000.00 VARIOUS DILG PROJECTS 5,700,000.00 5,700,000.00 CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DCC WITH COMPLETE SET OF SOAP AND TOOTHPASTE 500,000.00 500,000.00 595 MAGSAYSAY 2,350,000.00 - - - 4,200,000.00 - 2,200,000.00 - - 2,739,000.00 - - - 1,011,000.00 12,500,000.00 INFRASTRACTURE SUPPORT TO AGRCULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,660,000.00 1,660,000.00 ORGANIC FERTILIZER PRODUCTION 690,000.00 690,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL II 3,500,000.00 3,500,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL II 700,000.00 700,000.00 HEALTH FACIITIES ENHANCEMENT PROGRAM 2,200,000.00 2,200,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICRO INTERPRISE DEVELOPMENT 1,632,000.00 1,632,000.00 VARIOUS PROJECTS 1,107,000.00 1,107,000.00 CONSTRUCTION OF CONDUCIVE SPACIOUS DAY CENTER AND OFICE OF PWD'S AND ELDERLIES - CONSTRUCTION OF HAND WASHING FACILITIES AND PROVISION OF HYGIENE KIT - VARIOUS PROJECTS 1,011,000.00 1,011,000.00 CONCRETING OF 400M ROAD (SITIO BAGONG SILANG TO SITIO TALAYOB, BRGY. NICOLAS) - 596 MAMBURAO 3,600,000.00 - - 1,300,000.00 4,050,000.00 - - - - 3,550,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE THROUGH ACQUISITION OF COMBINE HARVESTER THRESHER 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM THROUGH DISTRIBUTION OF FISHING GENERATOR SET 1,600,000.00 1,600,000.00 REPAIR OF 11 CLASSROOM BUILDINGS 1,300,000.00 1,300,000.00 REPLACEMENT OF EXISTING WATER DISTRIBUTION LINES LEVEL III 2,000,000.00 2,000,000.00 CONSTRUCTION/REHABILITATION OF DRAINAGE CANALS 2,050,000.00 2,050,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS PROJECTS 3,550,000.00 3,550,000.00 CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF BAHAY PAG-ASA (YOUTH CENTER) - 597 PALUAN 2,500,000.00 - - 300,000.00 5,700,000.00 - - - 3,500,000.00 500,000.00 - - - - 12,500,000.00 SMALL WATER IMPOUNDING PROJECT 2,000,000.00 2,000,000.00 PROVISION OF MOTORBOAT ENGINE 500,000.00 500,000.00 GULAYAN SA CLC 300,000.00 300,000.00 VARIOUS PROJECTS 5,700,000.00 5,700,000.00 CONSTRUCTION OF DIKES - RUBBLE CONCRETING AND GABIONS - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION /IMPROVEMENT OF MT. CALAWAGAN RESORT FACILITIES 3,500,000.00 3,500,000.00 LIVELIHOOD TRAINING ASSISTANCE 500,000.00 500,000.00 598 RIZAL 6,800,000.00 - 2,500,000.00 - - - - - - - - - 3,200,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 6,800,000.00 6,800,000.00 ARTIFICIAL REEF - COMMUNITY PALAY SEED BANKING - FARM TRACTOR W/ COMPLETE ACCESSORIES - LAMBAKLAD PROJECT(OTOSHI-AMI) - MULTI ORGANIC DEMO FARM - PROVISION OF GILLNET TO RIZAL FISHER FOLKS - VERMICOMPOSTING PROJECT - NGP-ESTABLISHMENT OF NURSERY AND DISTRIBUTION OF FRUIT TREES SEEDLINGS 2,500,000.00 2,500,000.00 FOOD PROCESSING 2,200,000.00 2,200,000.00 COMMUNITY BASED TRAINING ON METAL AND IRON WORKS AND FABRICATION 1,000,000.00 1,000,000.00 599 SABLAYAN - - - - - - - - - - - - - 16,500,000.00 16,500,000.00 CONCRETING OF ROAD 16,500,000.00 16,500,000.00 CONCRETING OF ROAD - 600 SAN JOSE 5,300,000.00 - - 1,980,000.00 4,700,000.00 - 5,348,000.00 - - 8,172,000.00 - - - - 25,500,000.00 VARIOUS PROJECTS 5,300,000.00 5,300,000.00 COMBINE HARVESTER - MOTORIZED FISHING BOAT AND FISHING NETS - SHALLOWTUBEWELLS - GULAYAN SA PAARALAN 600,000.00 600,000.00 ABOT-ALAM PROGRAM 1,380,000.00 1,380,000.00 REHABILITATION/CONSTRUCTION OF HANGING BRIDGE 3,000,000.00 3,000,000.00 CONSTRUCTION OF THREE (3) BARREL BOX CULVERT 1,700,000.00 1,700,000.00 ENVIRONMENTAL SANITATION 1,248,000.00 1,248,000.00 MATERNAL, NEONATAL AND CHILD HEALTH CARE 1,962,000.00 1,962,000.00 NUTRITION SERVICES 1,586,000.00 1,586,000.00 TB CONTROL 552,000.00 552,000.00 PROTECTIVE SERVICES (INFRA SUPPORT) - CONSTRUCTION/REPAIR/UPGRADING OF DCCS AND SNPS 3,000,000.00 3,000,000.00 PROTECTIVE SERVICES (CAPACITY BUILDING) - OPERATIONS AND MAINTENANCE OF THE BAHAYPAG-ASA 1,116,000.00 1,116,000.00 PROTECTIVE SERVICES (INFRA SUPPORT) - CONSTRUCTION OF WOMEN/VAWC CRISIS CENTER 1,500,000.00 1,500,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DCCS AND SNPS 1,056,000.00 1,056,000.00 SUSTAINABLE LIVELIHOOD PROGRAMS - TRAINING AND SKILLS DEVELOPMENT INCLUDING LIVELIHOOD ASSISTANCE FOR DIFFERENT SECTORAL GROUPS LIKE SENIOR CITIZENS, WOMEN, PWDS, INDEGENOUS PEOPLE, TRANSPORT GROUPS, FARMERS AND COOPERATIVES, AND OTHERS 1,500,000.00 1,500,000.00 601 SANTA CRUZ 6,615,974.53 - - - 774,787.54 - - - - 1,165,737.64 602,612.51 2,840,887.78 - 500,000.00 12,500,000.00 VARIOUS PROJECTS 6,615,974.53 6,615,974.53 CONSTRUCTION OF TRADING POST (BAGSAKAN CENTER) PHASE I - INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION - MULTI-PURPOSE DRYING PAVEMENT - MOBILE FISH/MARINE PRODUCTS VENDING - FISHING BOATS - CONSTRUCTION OF BOX CULVERT / FOOT BRIDGE 774,787.54 774,787.54 IMPROVEMENT OF DAY CARE CENTERS 623,386.34 623,386.34 SUSTAINABLE LIVELIHOOD PROGRAM (FOOD PROCESSING, PACKAGING AND MARKETING, LIVESTOCK RAISING, VEGETABLE FARMING) 542,351.30 542,351.30 YAMAN PINOY (SANDALS AND OTHER LEATHER AND RUBBER PRODUCTS MAKING) 602,612.51 602,612.51 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 2,840,887.78 2,840,887.78 ORIENTAL MINDORO 40,945,719.00 1,000,000.00 1,500,000.00 7,330,000.00 97,946,581.00 800,000.00 7,660,000.00 4,530,000.00 3,120,000.00 25,900,000.00 10,427,700.00 1,500,000.00 2,540,000.00 5,300,000.00 210,500,000.00 602 BACO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 IMPROVEMENT AND EXPANSION OF PAGASA WATER SYSTEM (PHASE I) - 603 BANSUD - - - - - - - - - 12,500,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 FLOOD CONTROL- RIVER PROTECTION DIKE - 604 BONGABONG 2,800,000.00 - - - 9,700,000.00 - - - - - 500,000.00 1,500,000.00 - - 14,500,000.00 ESTABLISHMENT OF VERMI COMPOSTING FACILITY WITH TRAINING (P400,000) AND DISTRIBUTION OF HIGH VALUE CROPS PLANTING MATERIALS (MANGO) (P 100,000) 500,000.00 500,000.00 PROVISION OF FOUR-WHEEL FARM TRACTOR 550,000.00 550,000.00 PROVISION OF FOUR-WHEEL FARM TRACTOR 550,000.00 550,000.00 PROVISION OF SMALL FARM IMPLEMENTS AND ESTABLISHMENT OF GREEN HOUSE 500,000.00 500,000.00 CONSTRUCTION OF TRADING POST (CONSTRUCTION OF BAGSAKAN CENTER) 700,000.00 700,000.00 PROVISION OF POTABLE WATER SUPPLY 800,000.00 800,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS UPGRADING OF EXISTING WATER SYSTEM 800,000.00 800,000.00 VARIOUS PROJECTS 8,100,000.00 8,100,000.00 CONSTRUCTION OF EVACUATION CENTER-1 - CONSTRUCTION OF EVACUATION CENTER-2 - CONSTRUCTION OF EVACUATION CENTER-3 - CONSTRUCTION OF EVACUATION CENTER-4 - CONSTRUCTION OF EVACUATION CENTER-5 - CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF FLOOD CONTROL (SHEET FILES & PILE CAP) - YAMAN PINOY - TRAINING ON PRODUCT DEVELOPMENT AND MARKETING 500,000.00 500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,500,000.00 1,500,000.00 605 BULALACAO (SAN PEDRO) - - 1,000,000.00 - 11,500,000.00 - - - - - - - - - 12,500,000.00 NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 SALINTUBIG FOR POBLACION AND CAMPAASAN PHASE I 11,500,000.00 11,500,000.00 606 CALAPAN CITY 7,800,000.00 - - 2,000,000.00 1,000,000.00 - 2,160,000.00 500,000.00 - 800,000.00 1,200,000.00 - 1,540,000.00 500,000.00 17,500,000.00 VARIOUS PROJECTS 7,800,000.00 7,800,000.00 GOAT RAISING FOR MEAT & MILK PRODUCTION - COMMUNITY-BASED ORGANIC FERTILIZER PRODUCTION - LIVELIHOOD PROGRAM (COASTAL RESOURCE MANAGEMENT) - IMPROVEMENT OF KPLN FOOD PROCESSING CENTER - LIVELIHOOD TRAININGS FOR ORGANIC FARMING - FARM IMPLEMENTS - COLD STORAGE FACILITIES - ACQUISITION OF PATROL BOAT - HOG RAISING PROJECT FOR PWDS - REPAIR & REHABILITATION OF SPED CLASSROOM 500,000.00 500,000.00 REPAIR & REHAB. OF CALAPAN EAST DISTRICT & CALAPAN CENTRAL SCHOOL 500,000.00 500,000.00 RENOVATION OF CLASSROOM AT ADRIATICO MEMORIAL SCHOOL 500,000.00 500,000.00 RENOVATION OF CLASSROOM AT LALUD ELEMENTARY SCHOOL 500,000.00 500,000.00 EVACUATION FACILITY 500,000.00 500,000.00 ADDITIONAL BUDGET FOR RESCUE/EVACUATION CENTERS 500,000.00 500,000.00 HEALTH SERVICE SUPPLIES, EQUIPMENT & FACILITIES (ANTI-RABIES & ANTI-TETANOUS VACCINES, AMBULANCE, MEDICINES FOR THE INDIGENT) 2,160,000.00 2,160,000.00 LIVELIHOOD TRAINING FOR COOPERATIVES (DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 CONSTRUCTION OF SENIOR CITIZENS BUILDING 800,000.00 800,000.00 YAMAN PINOY LIVELIHOOD TRAINING 700,000.00 700,000.00 MARKET DEVELOPMENT FOR LOCAL AND ORGANIC PRODUCTS 500,000.00 500,000.00 ORGANIC FARMING (PRODUCTION OF FERTILIZER, VEGETABLES & PALAY) 500,000.00 500,000.00 LIVE LIVELIHOOD TRAININGS ON ONSUMER ELECTRONICS SERVICING NC II, FOOD PROCESSING, ELECTRICAL INSTALLATION AND MAINTENANCE AND MOTORCYCLE SMALL ENGINE SERVICING NC II 1,540,000.00 1,540,000.00 607 GLORIA - - - - 8,600,000.00 800,000.00 - - - 3,100,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS 8,600,000.00 8,600,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL I - CONSTRUCTION OF WATER SYSTEM LEVEL I - CONSTRUCTION OF WATER SYSTEM LEVEL I - CONSTRUCTION OF PUMP-DRIVEN WATER SYSTEM LEVEL II - CONSTRUCTION OF PUMP-DRIVEN WATER SYSTEM LEVEL II - CONSTRUCTION OF PUMP-DRIVEN WATER SYSTEM LEVEL II - EXPANSION OF WATER SYSTEM LEVEL II - HOUSEHOLD ELECTRIFICATION PROGRAM (FOR SOLAR ELECTRIFICATION) 800,000.00 800,000.00 CONSTRUCTION OF DAY CARE CENTER 1,600,000.00 1,600,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 608 MANSALAY 2,000,000.00 1,000,000.00 - 100,000.00 7,380,000.00 - - - 520,000.00 - 2,500,000.00 - - - 13,500,000.00 CASSAVA PLANTATION/PROCESSING 500,000.00 500,000.00 REHABILITATION OF WASIG IRRIGATION 500,000.00 500,000.00 REHABILITATION OF IRRIGATION CANAL 500,000.00 500,000.00 FISH CANNING 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 VARIOUS PROJECTS 7,380,000.00 7,380,000.00 REHABILITATION / EXPANSION OF MANSALAY WATER SYSTEM ( PHASE II) LEVEL II ( SO. PANHULUGAN, BRGY. PANAYTAYAN) - ESTABLISHMENT / ENHANCEMENT OF MANGYAN VILLAGES" IN PANAYTAYAN AND BAIT 520,000.00 520,000.00 COCO SUGAR PRODUCTION 2,500,000.00 2,500,000.00 609 NAUJAN 2,500,000.00 - - - 18,000,000.00 - - - - 1,500,000.00 1,500,000.00 - - - 23,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (ACQUISITION OF HAND TRACTOR) 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (PROVISION OF MOTORIZED BANCA) 500,000.00 500,000.00 FARM IMPLEMENTS/TOOLS 500,000.00 500,000.00 MARINE RESERVE AND FISH SANCTUARIES 500,000.00 500,000.00 VARIOUS PROJECTS 17,500,000.00 17,500,000.00 EVACUATION FACILITY - RESCUE EQUIPMENT - CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS - CONSTRUCTION OF DAY CARE CENTER 1,500,000.00 1,500,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) STREAMLINING OF BPLS 1,000,000.00 1,000,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) FORMULATION OF MUNICIPAL INVESTMENT INCENTIVES CODE 500,000.00 500,000.00 610 PINAMALAYAN 2,500,000.00 - - 1,000,000.00 2,500,000.00 - 1,500,000.00 3,200,000.00 1,300,000.00 4,000,000.00 - - 500,000.00 - 16,500,000.00 LIVELIHOOD ASSISTANCE FOR MARGINAL FARM WORKERS 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE FOR FISHERMEN 500,000.00 500,000.00 UPLAND FARMING SYSTEM 1,000,000.00 1,000,000.00 LIVESTOCK & POULTRY PRODUCTION 500,000.00 500,000.00 REHABILITATION OF HOME ECONOMICS CLASSROOMS 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION & REHABILITATION OF DRAINAGE CANAL & CULVERTS IN FLOOD PRONE BARANGAYS - ESTABLISHMENT OF MUNICIPAL HUMAN & ANIMAL BITE TREATMENT CENTER 1,000,000.00 1,000,000.00 HEALTH PROGRAM FOR PWD 500,000.00 500,000.00 LIVELIHOOD TRAINING & CAPITAL ASSISTANCE ON POTTERY, HANDICRAFT, FISH, MEAT & FOOD PROCESSING 1,000,000.00 1,000,000.00 LIVELIHOOD ASSISTANCE FOR MARKET VENDORS 1,200,000.00 1,200,000.00 LIVELIHOOD ASSISTANCE FOR IPS 500,000.00 500,000.00 JOB & TRADE FAIR & SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENTS 500,000.00 500,000.00 MICRO-TOURISM PROGRAM (SCUBA DIVING SITE & FISH SANCTUARY DEVELOPMENT) 1,300,000.00 1,300,000.00 PROVISION OF PSYCHOSOCIAL SUPPORT AMONG DIFFERENT SECTORS 500,000.00 500,000.00 PROVISION OF PHYSICAL FITNESS EQUIPMENT FOR SENIOR CITIZENS 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE FOR PWD 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE FOR SOLO PARENT 500,000.00 500,000.00 FINANCIAL ASSISTANCE FOR TERTIARY STUDENTS 2,000,000.00 2,000,000.00 ALS SKILLS TRAINING & CAPITAL ASSISTANCE FOR OSY (SKILLS TRAINING FOR OSY) 500,000.00 500,000.00 611 POLA 6,810,000.00 - - - 4,900,000.00 - - - - - - - - 790,000.00 12,500,000.00 VARIOUS PROJECTS 6,810,000.00 6,810,000.00 FARMERS FIELD SCHOOL THRU ESTABLISHMENT OF COMMUNITY DEMO FARM - ESTABLISHMENT/PROTECTION OF FISH SANCTUARY - PURCHASE OF 20 UNITS OF HAND TRACTOR - LIVESTOCK PRODUCTION PROGRAM REVOLVING-LIVESTOCK RAISING PROJECT - CONSTRUCTION OF TRADING POST (BAGSAKAN CENTER) - CONSTRUCTION OF SMOKEHOUSE BUILDING & PURCHASE OF EQUIPMENT AND FACILITY & PROVISION OF RELATED TRAINING FOR SMOKE FISH PROCESSING - PROVISION OF POTABLE WATER SUPPLY ( CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEMS INCLUDING APPROPRIATE WATER TREATMENT SYSTEMS ) 3,600,000.00 3,600,000.00 TRANSPORT TERMINAL 1,300,000.00 1,300,000.00 CORE LOCAL ROAD 790,000.00 790,000.00 612 PUERTO GALERA 620,000.00 - 500,000.00 730,000.00 2,640,000.00 - 2,000,000.00 - - 1,000,000.00 2,500,000.00 - 500,000.00 2,010,000.00 12,500,000.00 ORGANIC FERTILIZERS & VEGETABLE PRODUCTION/WASTE COMPOSTING; VERMICULTURE TRAINING & PRODUCTION 620,000.00 620,000.00 NATIONAL GREENING PROGRAM/PROCUREMENT OF SEEDLING 500,000.00 500,000.00 GULAYAN SA PAARALAN 230,000.00 230,000.00 REPAIR OF CLASSROOMS (PUBLIC SCHOOLS) 500,000.00 500,000.00 VARIOUS PROJECTS 2,640,000.00 2,640,000.00 SALINTUBIG - IMPROVEMENT/REHABILITATION OF WATER SYSTEM (PHASE II) - DRRM - ACQUISITION OF RESCUE EQUIPMENT, WARNING DEVICE (SIREN) GENERATOR SETS, WATER PURIIFIER, ETC. - FLOOD CONTROL PROGRAM - CONSTRUCTION OF DRAINAGE - HEALTH EMERGENCY MANAGEMENT - TRAINING ON FIRST-AID (ALL BARANGAYS - BDRRMCS, RESORT FIRST-AIDERS, COMMUNITY HEALTH TEAMS AND BARANGAY HEALTH WORKERS 500,000.00 500,000.00 HEALTH FACILITY/FACILITIES ENHANCEMENT OPB/MATERNAL AND NEWBORN CARE 670,000.00 670,000.00 TRAINING ON DOH HEALTH PROGRAMS/COMMUNITY HEALTH TEAMS MOBILIZATION 830,000.00 830,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF WOMEN CRISIS CENTER) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - SKILLS TRAINING ON SEWING OF BEDDINGS, PILLOWCASES, CURTAINS RAGS, POTHOLDERS, ETC.; ACCESSORIES & SOUVENIR -MAKING; COMMUNITY ECONOMIC ENTERPRISE 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED-LIVELIHOOD & OTHER AGRI- FISHERY BUSINESS INVESTMENT (ECO BAG-MAKING; ORGANIC ESSENTIAL OIL -MAKING ; ORGANIC SOAP/DISHWASHING, BATH SOAPMAKING ; FOOD PROCESSING (PASALUBONG PRODUCTS); COCONUT SWEETS & DELICACIES; TRAINING ON HORTICULTURE (ORNAMENTAL) 500,000.00 500,000.00 SHARED SERVICE FACILITY - ESTABLISHMENT OF PRODUCTION CENTER 1,000,000.00 1,000,000.00 MICRO-ENTERPRISE DEVELOPMENT PROGRAM - SKILLS TRAINING/PRODUCT DEVELOPMENT - PACKAGING, LABELING, MARKETING & PROMOTION 500,000.00 500,000.00 ESTABLISHMENT OF PASALUBONG CENTER 500,000.00 500,000.00 REHABILITATION OF BARANGAY ROADS 2,010,000.00 2,010,000.00 CAPACITY-BUILDING ON EFFECTIVE CUSTOMER SERVICES 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 613 ROXAS 2,586,419.00 - - - 5,413,581.00 - 1,000,000.00 - - 500,000.00 1,500,000.00 - - 1,500,000.00 12,500,000.00 VARIOUS PROJECTS 2,586,419.00 2,586,419.00 CONSTRUCTION OF MECHANICAL DRYING FACILITY - REHABILITATION OF IRRIGATION FACILITY - ORGANIC FERTLIZER PRODUCTION TRAINING AND SEMINARS - LIVESTOCK CATTLE RAISING - ORGANIC FERTLIZER PRODUCTION - CONSTRUCTION OF POST HARVEST FACILITY,SOLAR DRYER/MULTI-PURPOSE (BUKLURAN) - CATTLE FATTENING - CONSTRUCTION OF FLOOD CONTROL FACILITY 2,413,581.00 2,413,581.00 CONSTRUCTION OF TRANSPORT TERMINAL 3,000,000.00 3,000,000.00 ACQUISITION OF HEALTH RELATED EQUIPMENT 500,000.00 500,000.00 CAPABILITY BUILDING OF BHW/ CHT 500,000.00 500,000.00 PROTECTED SERVICES: CAPABILITY BUILDING FOR LCW 500,000.00 500,000.00 FOOD PROCESSING AND PACKAGING 1,000,000.00 1,000,000.00 CAPABILITY BUILDING & LIVELIHOOD DEVELOPMENT FOR CANTIL SHARE GROUP ASSOCIATION (YAMAN PINOY) 500,000.00 500,000.00 LOCAL ROAD CONSTRUCTION 1,500,000.00 1,500,000.00 614 SAN TEODORO 1,459,300.00 - - 2,000,000.00 5,813,000.00 - 500,000.00 - - 2,000,000.00 727,700.00 - - - 12,500,000.00 VARIOUS PROJECTS 1,459,300.00 1,459,300.00 PROVISION OF FOUR (4) UNITS HAND TRACTOR AND THREE (3) THRESHERS - CONSTRUCTION OF CONCRETE IRRIGATION CANAL - CONSTRUCTION OF BAGSAKAN CENTER FOR FISH AND VEGETABLE - PROVISION OF FISH PROCESSING EQUIPMENT, TRAINING AND CAPITAL - PURCHASE OF FARM TRACTOR CULTIVATOR (FARM TOOL) - PURCHASE OF MOTORIZED BANCA, PAYAW(FISH SHELTER) MATERIALS AND TRAINING FOR MARINE PROTECTED AREAS OF SAN TEODORO - REPAIR OF CLASSROOMS IN DIFFERENT BARANGAY SCHOOLS 1,160,000.00 1,160,000.00 PROVISION OF SCHOOL FURNITURES (WOODEN ARMCHAIR) 840,000.00 840,000.00 IMPROVEMENT/EXPANSION OF LEVEL III WATER SYSTEM 4,313,000.00 4,313,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 PROVISION OF MEDICAL EQUIPMENT AND SUPPLIES 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 650,000.00 650,000.00 PROVISION OF ECCD MATERIALS IN DAY CARE CENTER 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR PANTAWID BENEFICIARIES AND PWDS 850,000.00 850,000.00 MANUFACTURING OF SOY SAUCE AND VINEGAR 727,700.00 727,700.00 615 SOCORRO 4,500,000.00 - - - 8,000,000.00 - - - - - - - - - 12,500,000.00 INSTALLATION OF MECHANICAL DRYING FACILITIES 4,500,000.00 4,500,000.00 VARIOUS PROJECTS 8,000,000.00 8,000,000.00 CONSTRUCTION OF TWO (2) STOREY MDRRMC BUILDING WITH PROVISION OF EVACUATION AREA (A MULTIPURPOSE TYPHOON RESISTANT BUILDING) - 616 VICTORIA 7,370,000.00 - - 1,500,000.00 - - 500,000.00 830,000.00 1,300,000.00 500,000.00 - - - 500,000.00 12,500,000.00 VARIOUS PROJECTS 7,370,000.00 7,370,000.00 REHABILITATION AND MAINTENANCE OF COMMUNAL IRRIGATION SYSTEM - TRAINING ON COCONUT MILK AND OIL PRODUCTION - LIVESTOCK PROGRAM - SUSTAINABLE SWINE DISPERSAL PROGRAM - CORN PRODUCTION - LIVESTOCK PROGRAM - SWINE BREEDING TO FATTENING OPERATION - ESTABLISHMENT OF PLANT NURSERY AND OTHER RELATED INCOME-GENERATING ACTIVITY - ESTABLISHMENT OF CATTLE MULTIPLIER FARM FOR DAIRY ENTERPRISE DEVELOPMENT - HIGH VALUE CROPS DEVELOPMENT - MANGO PRODUCTION - ORGANIC FARMING - REPAIR/REHABILITATION OF CLASSROOMS (MINAS, BETHEL, SIMON GAYUTIN, VICTORIA AND ALCATE ELEM. SCHOOL) 1,500,000.00 1,500,000.00 CONSTRUCTION OF FUNCTIONAL LACTATION STATION AT OPM, NPM, TERMINAL AND NEWMUN BUILDING 500,000.00 500,000.00 METALWORKS FABRICATION 830,000.00 830,000.00 LOCAL TOURISM DEVELOPMENT PROJECT - WHITE WATER RAFTING 1,300,000.00 1,300,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICROENTERPRISE DEVELOPMENT TRACK FOR 4PS BENEFICIARIES 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 PALAWAN 81,364,075.76 - 6,000,000.00 22,792,051.39 76,141,564.95 9,116,500.00 28,062,173.91 717,316.00 14,811,151.52 33,705,668.65 8,445,000.00 500,000.00 4,485,497.82 26,359,000.00 312,500,000.00 617 ABORLAN 5,100,000.00 - - 2,240,000.00 - - - - - - - - - 5,160,000.00 12,500,000.00 VARIOUS PROJECTS 5,100,000.00 5,100,000.00 COLD STORAGE FACILITIES - INFRA-SUPPORT TO AGRICULTURE FACILITIES (RICE HARVESTER) - POST HARVEST FACILTIES AND EQUIPMENTS (MULTI-PURPOSE DRYING PAVEMENT WITH STORAGE ) - POST HARVEST FACILTIES AND EQUIPMENTS (MECHANICAL DRYER) - REHABILITATION OF IRRIGATION CANAL - REPAIR AND REHABILITATION OF CLASSROOM 2,240,000.00 2,240,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (HOG RAISING AND ORGANIC VEGETABLE PRODUCTION) 5,160,000.00 5,160,000.00 618 AGUTAYA 2,405,000.00 - - 925,000.00 897,500.00 7,000,000.00 - - - 1,272,500.00 - - - - 12,500,000.00 VARIOUS PROJECTS 2,405,000.00 2,405,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS MULTI PURPOSE PAVEMENT - ASSISTANCE TO SEAWEEDS PLANTERS - LIVELIHOOD PROGRAM - ASSISTANCE AND LIVELIHOOD PROGRAM - PURCHASE OF CHAIRS/FURNITURES/FIXTURES 925,000.00 925,000.00 CONSTRUCTION OF LEVEL 2 WATER SUPPLY 897,500.00 897,500.00 ELECTRIFICATION PROJECT 7,000,000.00 7,000,000.00 PROGRAM FOR SCS AND PWDS 772,500.00 772,500.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 619 ARACELI 4,100,000.00 - 1,000,000.00 220,000.00 - - 1,000,000.00 - - 3,180,000.00 - - - 3,000,000.00 12,500,000.00 VARIOUS PROJECTS 4,100,000.00 4,100,000.00 CONSTRUCTION OF VOUYS AND HART REEF MONITORING STATIONS - CONSTRUCTION OF ANTI-ILLEGAL FISHING MONITORING STATIONS - AGRI-FISHERY BASED LIVELIHOOD AND AGRI-FISHERY BUSINESS INVESTMENTS FOR CSOS 1. POULTRY AND LIVESTOCK RAISING 2. RICE TRADING 3. PROVISION OF RICE SEED ASSISTANCE 4. VEGETABLE PRODUCTION 5. BOTIKA OF VETERINARY MEDICINES - SEEDLING DISPERSAL PROGRAM - MANGROVE REHABILITATION PROGRAM 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 220,000.00 220,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 RABIES ELIMINATION PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER (WITH DESIGNATED ROOMS FOR EACH CASES OF WOMEN AND GIRLS - CHILD ABUSES.) 1,500,000.00 1,500,000.00 REPAIR/UPGRADING OF DAY CARE CENTER 680,000.00 680,000.00 PROTECTIVE SERVICES CAPACITY BUILDING FOR DAY CARE AND HEALTH WORKERS 500,000.00 500,000.00 REPAIR AND MAINTENANCE OF ROADS 3,000,000.00 3,000,000.00 620 BALABAC 3,900,000.00 - - 2,500,000.00 - - 3,750,000.00 - - 2,350,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS 3,900,000.00 3,900,000.00 AVAILMENT OF TWO (2) UNIT 4-WHEEL DRIVE FARM TRACTOR 30-40 HORSE POWER WITH ACCESSORIES (PLOW, HARROWAND PLANTER) - ACQUISITION OF FOUR (4) UNITS MECHANICAL DRIER - GULAYAN SA PAARALAN 500,000.00 500,000.00 BASIC EDUCATION ENHANCEMENT PROGRAM SCHOOL / CLASSROOM REPAIRS 1,500,000.00 1,500,000.00 ALS/LIVELIHOOD EDUCATION PROGRAM 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (CONSTRUCTION OF BRGY.HEALTH STATION) 1,500,000.00 1,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (PROVISION OF BIRTHING FACILITIES) 2,250,000.00 2,250,000.00 WOMEN CRISIS CENTER 1,175,000.00 1,175,000.00 DAY CARE CENTER UPGRADING AND CONSTRUCTION 1,175,000.00 1,175,000.00 621 BATARAZA 4,189,500.00 - - - - 2,116,500.00 510,000.00 - - - 2,025,000.00 - - 3,159,000.00 12,000,000.00 VARIOUS PROJECTS 4,189,500.00 4,189,500.00 CONSTRUCTION OF FLATBED DRYER AND MULTI-PURPOSE DRYING PAVEMENT - TUNA FISHING USING DRIFT NETS - OFF-GRID SITIOS ELECTRIFICATION PROGRAM 2,116,500.00 2,116,500.00 ORIENTATION ON REVISED GUIDELINES ON BITE MANAGEMENT 510,000.00 510,000.00 YAMAN PINOY 2,025,000.00 2,025,000.00 CORE LOCAL ROADS CONSTRUCTION 3,159,000.00 3,159,000.00 622 BROOKE'S POINT - - - 2,000,000.00 6,000,000.00 - 1,500,000.00 - - 1,800,000.00 - - 1,200,000.00 - 12,500,000.00 REPAIR/REHABILITATION OF CLASSROOM 2,000,000.00 2,000,000.00 VAROIUS WATER PROJECTS 6,000,000.00 6,000,000.00 WATER SYSTEM (POTABLE WATER) - HEALTH EMERGENCY MANAGEMENT 750,000.00 750,000.00 INFECTIOUS DISEASE 750,000.00 750,000.00 SUSTAINABLE LIVELIHOOD 800,000.00 800,000.00 SUPPLEMENTARY FEEDING PROGRAM 1,000,000.00 1,000,000.00 TECH. VOC. TRAINING 600,000.00 600,000.00 COMMUNITY BASED TRAINING 600,000.00 600,000.00 623 BUSUANGA 5,000,000.00 - 1,000,000.00 - - - 504,000.00 - 5,996,000.00 - - - - - 12,500,000.00 VARIOUS PROJECTS 5,000,000.00 5,000,000.00 CONSTRUCTION OF FISH PORT PH II - IMPROVEMENT OF MPA'S - ESTABLISHMENT OF MPA'S - PURCHASE OF TRACTORS & THRESHER - NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 504,000.00 504,000.00 BUSUANGA RIVER CRUISE PH I 3,996,000.00 3,996,000.00 CONSTRUCTION OF SALVACION PEAK/VIEWDECK 2,000,000.00 2,000,000.00 624 CAGAYANCILLO 6,500,000.00 - - 800,000.00 500,000.00 - 2,500,000.00 - - - - - 1,000,000.00 1,200,000.00 12,500,000.00 VARIOUS PROJECTS 6,500,000.00 6,500,000.00 SUSTAINABLE SWIN DISPERAL - MOTORIZED FISHING BOAT - COLD STORAGE AND MINI ICE PLANT - SEAWEEDS PRODUCTION (1 SET ICE MAKER) - REHABILITATION OF SECONDARY SCHOOL BUILDING 800,000.00 800,000.00 REHABILITATION OF FISH PORT(PHASE 1) 500,000.00 500,000.00 HFEP: 1 UNIT OF BEMONC WITH 2 BEDROOM CAPACITY 1,500,000.00 1,500,000.00 HFEP: 3-IN-1 FACILITY (PCB, MCP, TBDOTS) 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORE LOCAL ROAD REHABILITATION: 6KM LENGTH AND 2M SAND AND GRAVEL ROAD 1,200,000.00 1,200,000.00 SKILLS TRAINING WITH CERTIFICATE 1,000,000.00 1,000,000.00 625 CORON - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 PROVISION OF POTABLE WATER SUPPLY - 626 CULION 2,250,000.00 - - 600,000.00 3,504,000.00 - 4,646,000.00 - - 1,000,000.00 500,000.00 - - - 12,500,000.00 VARIOUS PROJECTS 2,250,000.00 2,250,000.00 CRAB FATTENING PROJECT - PROVISION OF AGAR-AGAR PLANTING MATERIALS - ENHANCEMENT OF MARINE PROTECTED AREAS - PROVISION OF HAND AND FOUR WHEEL TRACTOR - ESTABLISHMENT OF GREEN HOUSES - REPAIR/REHABILITATION OF CLASSROOMS (BALALA ELEM SCHOOL, ABUD-ABUD ELEM SCHOOL, CHINDONAN ELEM SCHOOL, LUAC ELEM SCHOOL, BALDAT ELEM SCHOOL) 500,000.00 500,000.00 GULAYAN SA PAARAALAN PROJECT 30,000.00 30,000.00 GULAYAN SA PAARAALAN PROJECT 40,000.00 40,000.00 GULAYAN SA PAARAALAN PROJECT 10,000.00 10,000.00 GULAYAN SA PAARAALAN PROJECT 10,000.00 10,000.00 GULAYAN SA PAARAALAN PROJECT 10,000.00 10,000.00 VARIOUS WATER PROJECTS 3,504,000.00 3,504,000.00 CONSTRUCTION OF WATER SUPPY SYSTEM (LEVEL II) - CONSTRUCTION OF WATER SUPPY SYSTEM (LEVEL II) - CONSTRUCTION OF BARANGAY HEALTH STATION 1,400,000.00 1,400,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 1,400,000.00 1,400,000.00 PROCUREMENT OF ANTI-RABIES VACCINES 770,000.00 770,000.00 PROCUREMENT OF BASIC EQUIPMENT AND INSTRUMENTS FOR MATERNAL CARE PACKAGE 538,000.00 538,000.00 PROCUREMENT OF BASIC EQUIPMENT AND INSTRUMENTS FOR MATERNAL CARE PACKAGE 538,000.00 538,000.00 PROCUREMENT OF ECCD CHILD LEARNING MATERIALS 500,000.00 500,000.00 CONSTRUCTION OF DAY-CARE CENTER PROJECT 500,000.00 500,000.00 YAMAN PINOY PROJECT 500,000.00 500,000.00 627 CUYO 2,500,000.00 - - - 2,000,000.00 - - - - - - - - 8,000,000.00 12,500,000.00 ESTABLISHMENT OF MARINE RESERVE SANCTUARY AND MARINE PROTECTED AREAS 1,000,000.00 1,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD PROJECT 1,500,000.00 1,500,000.00 BURAWIS-ANTIPOLO LEVEL II WATER SYSTEM 1,500,000.00 1,500,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 5,000,000.00 5,000,000.00 900MX4M ROAD EMBANKMENT WITH BASECOARSE, GROUTED RIPPRAP, LINE DITCH AND SINGLE RCBC 1,500,000.00 1,500,000.00 CONCRETING OF 375 M UPPER CATADMAN ROAD CONNECTING BARANGAY MARINGIAN WITH GROUTED REPRAP LINE DITCH AND SINGLE BARREL RCBC. 1,500,000.00 1,500,000.00 628 DUMARAN 5,000,000.00 - 1,500,000.00 - 1,500,000.00 - 2,000,000.00 - - - - - - 2,500,000.00 12,500,000.00 VARIOUS PROJECTS 5,000,000.00 5,000,000.00 CONSTRUCTION OF FISH PORT EXTENSION - AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES (BANANA PRODUCTION) - SMALL WATER IMPOUNDING PROJECT - NATIONAL GREENING PROGRAM (REFORESTATION) 1,500,000.00 1,500,000.00 SALINTUBIG- EXPANSION OF LEVEL III WATER SUPPLY PROJECT 1,500,000.00 1,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 PROJECT TO BE IDENTIFIED 2,500,000.00 2,500,000.00 629 EL NIDO (BACUIT) 2,500,000.00 - 500,000.00 1,000,000.00 4,000,000.00 - 1,000,000.00 - 500,000.00 500,000.00 1,000,000.00 500,000.00 1,000,000.00 - 12,500,000.00 VARIOUS PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF MASAGANA FISH PORT - CONSTRUCTION OF CORONG-CORONG FISH PORT - MARICULTURE PARK - FISHING BOATS AND NETS/GEARS - MULTI-PURPOSE DRYING PAVEMENT - SMALL FARM RESERVIOR - UPLAND REFORESTATION 500,000.00 500,000.00 SCHOOL BUILDING REPAIR 500,000.00 500,000.00 PROVISION OF SCHOOL FURNITURES 500,000.00 500,000.00 CONSTRUCTION OF DEEP WELL LEVEL II 4,000,000.00 4,000,000.00 TRAINING FOR HEALTH PROVIDERS 500,000.00 500,000.00 RABIES ELIMINATION 500,000.00 500,000.00 TOURISM SITE DEVELOPMENT 500,000.00 500,000.00 COMPLETION OF LIVELIHOOD AND CRISIS CENTER FOR WOMEN AND CHILDREN 500,000.00 500,000.00 FOOD AND MEAT PROCESSING 500,000.00 500,000.00 CASHEWNUT BUYING PROCESSING CENTER 500,000.00 500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 500,000.00 500,000.00 WELLNESS, MASSAGE CENTER AND SOUVINER SHOP 500,000.00 500,000.00 DRESS MAKING AND SEWING 500,000.00 500,000.00 630 KALAYAAN 2,000,000.00 - - - 10,000,000.00 - - - 500,000.00 - - - - - 12,500,000.00 VARIOUS PROJECTS 2,000,000.00 2,000,000.00 CONSTRUCTION OF GREEN HOUSES - CONSTRUCTION OF HYDROPHONICS - MOTORIZED BANCA - PAYAO PROJECT - ACQUISITION OF RESCUE AND EMERGENCY VESSEL 10,000,000.00 10,000,000.00 TOURISM FACILITY 500,000.00 500,000.00 631 LINAPACAN 1,250,000.00 - - 1,440,000.00 3,750,000.00 - 2,000,000.00 - 2,000,000.00 1,400,000.00 - - - 660,000.00 12,500,000.00 VARIOUS PROJECTS 1,250,000.00 1,250,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION DEVELOPMENT - PORT AND WHARVES - BASIC EDUCATION FACILITIES 900,000.00 900,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS BASIC EDUCATION FACILITIES 540,000.00 540,000.00 SALINTUBIG - CONSTRUCTION OF LEVEL II WATER SYSTEM 2,000,000.00 2,000,000.00 VARIOUS PROJECTS 1,750,000.00 1,750,000.00 FLOOD CONTROL PROGRAM - FLOOD CONTROL PROGRAM - HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS 1,000,000.00 1,000,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 900,000.00 900,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 660,000.00 660,000.00 632 MAGSAYSAY 9,000,000.00 - - 670,000.00 1,000,000.00 - 500,000.00 - - - - - - 1,330,000.00 12,500,000.00 VARIOUS PROJECTS 7,000,000.00 7,000,000.00 CONSTRUCTION OF TRADING POST - IMPROVEMENT OF MAGSAYSAY MARINE PROTECTED AREAS 1,000,000.00 1,000,000.00 GOAT FARMING 500,000.00 500,000.00 CASHEWNUTS PROCESSING - SEAWEEDS CULTURE PROJECT 500,000.00 500,000.00 GULAYAN SA PAARALAN 170,000.00 170,000.00 ABOT ALAM PROGRAM (CHILDREN WITH SPECIAL NEEDS 500,000.00 500,000.00 CONSTRUCTION OF WHARF 1,000,000.00 1,000,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM WITH HEALTH FACILITY ENHANCEMENT 500,000.00 500,000.00 CONSTRUCTION OF WOMEN CRISIS AND LIVELIHOOD CENTER - CORE LOCAL ROAD CONSTRUCTION 1,330,000.00 1,330,000.00 633 NARRA 1,250,000.00 - - 4,510,869.57 - - 3,652,173.91 - - 3,086,956.52 - - - - 12,500,000.00 VARIOUS PROJECTS 1,250,000.00 1,250,000.00 CONCRETING OF 300 LINEAR METERS OF IRRIGATION CANALS - CONSTRUCTION OF ONE UNIT SEAWEEDS TRADING POST/ WAREHOUSE - VEGETABLE PROCESSING - GULAYAN SA PAARALAN (37 ELEMENTARY AND 10 SECONDARY SCHOOLS) 456,521.74 456,521.74 PROVISION OF SCHOOL FURNITURE (SEATS) 2,836,956.53 2,836,956.53 CONSTRUCTION OF ONE UNIT 2 CLASSROOMS HS BUILDING 1,217,391.30 1,217,391.30 CONSTRUCTION OF THREE UNIT HALFWAY HOME FACILITY FOR GIDA AREAS (BGY. ARAMAYWAN, BRGY. BURIRAO, BRGY. IPILAN) 1,565,217.39 1,565,217.39 UPDGRADING OF ONE UNITS BARANGAY HEALTH STATION (BRGY. SANDOVAL) 521,739.13 521,739.13 UPDGRADING OF TWO UNITS RURAL HEALTH UNIT(BRGY. POBLACION) 1,565,217.39 1,565,217.39 CONSTRUCTION OF 4 DAY CARE CENTERS (PUROK MAUNLAD, BRGY. ARAMAYWAN; PUROK PAGKAKAISA, BRGY. MALINAO; PUROK DAMAYAN, BRGY. PANACAN 2; PUROK ULIRAN, BRGY. PANACAN) 2,086,956.52 2,086,956.52 CONSTRUCTION OF ONE UNIT PWD SHELTERED WORKSHOP AND AREA VOCATIONAL REHABILITATION CENTER 1,000,000.00 1,000,000.00 634 PUERTO PRINCESA CITY (CAPITAL) 6,307,575.76 - - 568,181.82 3,010,064.95 - - 717,316.00 1,415,151.52 9,196,212.13 - - 1,285,497.82 - 22,500,000.00 VARIOUS PROJECTS 4,907,575.76 4,907,575.76 COMMUNAL IRRIGATION PROJECT (SUPPLEMENTARY) - COMMUNAL IRRIGATION PROJECT - MOTORIZED FISHING BANCA WITH FISHING PARAPHERNALIA 1,400,000.00 1,400,000.00 OUT OF SCHOOL YOUTH RESIDENTIAL PROGRAM (MODULE 1, 2 AND 3) 568,181.82 568,181.82 SPRING DEVELOPMENT: LEVEL II WATER SUPPLY 707,575.76 707,575.76 SPRING DEVELOPMENT: LEVEL I WATER SUPPLY 531,060.61 531,060.61 SPRING DEVELOPMENT: LEVEL II WATER SUPPLY 1,771,428.58 1,771,428.58 BAMBOO FURNITURE, ON-CALL HOUSE MAINTENANCE, ETC. PROJECTS 717,316.00 717,316.00 HANGING BRIDGE PROJECT 707,575.76 707,575.76 PALAWAN ECOLOGICAL ADVENTURE TRAIL PROJECT 707,575.76 707,575.76 FINANCIAL ASSISTANCE TO EDUCATIONAL NEEDS OF IP (YOUTH) 531,060.61 531,060.61 GROUP HAND WASHING FAILITY FOR DAY CARE CENTERS 3,334,848.48 3,334,848.48 LEARNING MATERIALS, ETC. FOR DAY CARE CENTERS 1,515,151.52 1,515,151.52 CONTINUOUS CAPACITY BUILDING FOR PES AND DAY CARE WORKERS 531,060.61 531,060.61 SELF-EMPLOYEMENT ASSISTANCE KAUNLARAN (SEA-K) 3,284,090.91 3,284,090.91 OUT OF SCHOOL YOUTH RESIDENTIAL PROGRAM (MODULE 4 & 5) 568,181.82 568,181.82 WALANG TAMBAY SA BARANGAY 717,316.00 717,316.00 635 QUEZON 262,000.00 - 500,000.00 3,118,000.00 5,100,000.00 - - - - - 3,520,000.00 - - - 12,500,000.00 VARIOUS PROJECTS 262,000.00 262,000.00 CADT-DEVELOPMENT (ADSDPP FORMULATION) IP GROUP - CATTLE MULTIPLIER FARM - RUBBER PROCEESSING FACILITIES AND EQUIPMENT STATION - MANGROVE REFORESTATION AND REHABILITATION 500,000.00 500,000.00 PROVISION OF CLASSROOM CHAIRS FOR A TOTAL OF FORTY FOUR (44) SCHOOLS ALL OVER QUEZON, PALAWAN 2,618,000.00 2,618,000.00 LITERACT PROGRAM (IP GROUP) 500,000.00 500,000.00 REHABILITATION/EXPANSION/UPGRADING OF LEVEL II WATER SYSTEM INCLUDING APPROPRIATE WATER TREATMENT SYSTEM 3,400,000.00 3,400,000.00 MDRRMO RESCUE VEHICLES (TOYOTA HI-LUX) 1,700,000.00 1,700,000.00 YAMAN PINOY SARI-SARI STORE INCLUDING FRUITS AND VEGETABLES (BUSINESS SECTORS) 2,331,500.00 2,331,500.00 OTOP STORE EXPRESS FOOD HANDLERS ASSOCIATION - 1 UNIT TRANSPORT TERMINAL (BUSINESS SECTOR) 500,000.00 500,000.00 OTOP STORE EXPRESS - SARI SARI STORE (BUSINESS SECTOR) 688,500.00 688,500.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 636 RIZAL (MARCOS) 5,100,000.00 - - 1,150,000.00 500,000.00 - 500,000.00 - - 2,500,000.00 1,400,000.00 - - 1,350,000.00 12,500,000.00 ESTABLISHMENT/PROVISION OF FISHERY SUPPORT FACILITIES 2,200,000.00 2,200,000.00 SEEWEEDS FARMING PROGRAM 1,100,000.00 1,100,000.00 VARIOUS PROJECTS 1,800,000.00 1,800,000.00 GULAYAN SA MASA - CONSTRUCTION/PROVISION OF POST-HARVEST FACILITIES (FLATBED MECAHANICAL DRYER, MPDP, PALAY SHED, CORN SHELLER) - REPAIR/REHAB OF CLASSROOM 1,150,000.00 1,150,000.00 CAPABILITY-ENHANCEMENT AND LEADERSHIP TRAINING FOR CSO 500,000.00 500,000.00 WATER SANITATION AND HYGIENE (WASH) IN EMERGENCIES TRAINING 500,000.00 500,000.00 ESTABLISHMENT OF WOMEN CRISES CENTER 1,000,000.00 1,000,000.00 ESTABLISHMENT OF PERSON WITH DISABILITY (PWD) OFFICE 1,000,000.00 1,000,000.00 ECCD ENHANCEMENT PROGRAM 500,000.00 500,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 800,000.00 800,000.00 ESTABLISHMENT OF PASALUBONG CENTER 600,000.00 600,000.00 REHABILITATION OF MUNICIPAL ACCESS ROAD 1,350,000.00 1,350,000.00 637 ROXAS - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 CONSTRUCTION AND REHABILITATION OF POTABLE WATER SYSTEM - CONSTRUCTION AND REHABILITATION OF POTABLE WATER SYSTEM - CONSTRUCTION AND REHABILITATION OF POTABLE WATER SYSTEM - CONSTRUCTION AND REHABILITATION OF POTABLE WATER SYSTEM - CONSTRUCTION AND REHABILITATION OF POTABLE WATER SYSTEM - CONSTRUCTION AND REHABILITATION OF POTABLE WATER SYSTEM - CONSTRUCTION AND REHABILITATION OF POTABLE WATER SYSTEM - CONSTRUCTION AND REHABILITATION OF POTABLE WATER SYSTEM - 638 SAN VICENTE 4,050,000.00 - - 1,050,000.00 - - 2,000,000.00 - 3,400,000.00 2,000,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS 1,800,000.00 1,800,000.00 LIVE FISH AND FRESH FISH TRADING - ORGANIC FERTILIZER PRODUCTION 1,250,000.00 1,250,000.00 MARICULTURE DEVELOPMENT: SEAWEEDS FARMING - SWINE PRODUCTION WITH MEAT PROCESSING 500,000.00 500,000.00 MULTI-PURPOSE DRYING PAVEMENT 500,000.00 500,000.00 REHABILITATION OF 10 SCHOOL BUILDINGS (MUNICIPALITY OF SAN VICENTE BINGA E.S; NEWCANIPO E.S; ALIMANGUAN E.S; PANINDIGAN E.S; SAN VICENTE CENTRAL SCHOOL; KEMDENG E.S; BUNUANGIN E.S; NEWCARURAY E.S; MACATUMBALEN E.S AND SAN VICENTE NATIONAL HIGH SCHOOL) 1,050,000.00 1,050,000.00 TRAINING FOR HEALTH EMERGENCY MANAGEMENT COVERING 10 BRGYS 500,000.00 500,000.00 INFECTIOUS DISEASE CONTROL PROGRAM (TRAINING FOR ALL 10 BRGYS) 500,000.00 500,000.00 HFEP: UPGRADING AND REHAB OF BEMONC AND ASSISTANCE FOR PHIC ACCREDITATION 1,000,000.00 1,000,000.00 COMMUNITY BASED RURAL TOURISM IN SITIO BUNUANGIN, PORT BARTON 1,000,000.00 1,000,000.00 CONSTRUCTION OF TOURISM CENTER IN SITIO BIGAHO, PORT BARTON AND BRGY POBLACION 2,400,000.00 2,400,000.00 PROVISION OF HYGIENE KIT/ LEARNING MATERIALS FOR DAY CARE CENTERS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 ARUGA AT KALINGA SA BARANGAY (FOSTER PARENTING IN THE COMMUNITY) 500,000.00 500,000.00 639 SOFRONIO ESPAOLA - - - - 9,380,000.00 - 2,000,000.00 - - 1,120,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS 9,380,000.00 9,380,000.00 BOOM TRUCK RESCUE VEHICLE - CONCRETING AND RIPRAPPING OF RIVERBANKS - PROVISION OF MEDICAL EQUIPMENTS 1,000,000.00 1,000,000.00 RENOVATION OF 2 UNIT BARANGAY HEALTH STATIONS 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTER 1,120,000.00 1,120,000.00 640 TAYTAY 8,700,000.00 - 1,500,000.00 - - - - - 1,000,000.00 4,300,000.00 - - - - 15,500,000.00 VARIOUS PROJECTS 5,700,000.00 5,700,000.00 POBLACION BOAT LANDING - FOOD PROCESSING CENTER - BAGSAKAN CENTER - ORGANIC VEGETABLE PRODUCTION - RICE PRODUCTION - SEAWEEDS FARMING 1,800,000.00 1,800,000.00 MUSSELS AND SEA CUCUMBER CULTURE 1,200,000.00 1,200,000.00 RUBBER TREE SEEDLINGS DISTRIBUTION 1,000,000.00 1,000,000.00 IPIL-IPIL PLANTATION 500,000.00 500,000.00 TOURISM DEVELOPMENT PROJECT (VIEWDECK AND SOUVENIR SHOP) 1,000,000.00 1,000,000.00 RAINWATER COLECTOR 800,000.00 800,000.00 BAHAY PAG-ASA 3,000,000.00 3,000,000.00 KISLAP SEAWEEDS TRADING 500,000.00 500,000.00 ROMBLON 42,233,450.00 - - 9,070,000.00 113,445,000.00 - - - 3,000,000.00 11,402,550.00 2,000,000.00 - 1,000,000.00 32,849,000.00 215,000,000.00 641 ALCANTARA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 IMPROVEMENT/EXPANSION OF LEVEL III WATER SYSTEM - 642 BANTON 3,500,000.00 - - - 5,000,000.00 - - - - - 2,000,000.00 - - 2,000,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENT OF GOAT MULTIPLIER FARM 500,000.00 500,000.00 VARIOUS PROJECTS 3,000,000.00 3,000,000.00 DRIFT GILL/RING NET FISHING GEAR - FISH PORT REHABILITATION IN BRGY. TUNGONAN - FISH PORT REHABILITATION IN BRGY. NASUNOGAN - SAGANA AT LIGTAS NA TUBIG (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY (SPRING DEVELOPMENT, LEVEL I) 4,000,000.00 4,000,000.00 FLOOD CONTROL: RIPRAPING OF ARGAO CREEK IN BRGYS. SIBAY AND LIBTONG 1,000,000.00 1,000,000.00 ARROWROOT/CASSAVA PROCESSING 2,000,000.00 2,000,000.00 REHABILITATION OF BANTON CIRCUMFERENTIAL ROAD, NORTH SECTION 2,000,000.00 2,000,000.00 643 CAJIDIOCAN 6,046,000.00 - - - 4,500,000.00 - - - - 1,500,000.00 - - - 454,000.00 12,500,000.00 PROVISION OF HANDTRACTORS, THRESSERS WITH TRAILERS 1,200,000.00 1,200,000.00 SUSTAINABLE AGRI-FISHERY BASED AND SANCTUARY AND MARINE PROTECTED AREA 600,000.00 600,000.00 PROVISION OF MOTORIZED FISHING BOATS/ MARINE ENGINE /FAD AND FISH NETS 1,000,000.00 1,000,000.00 SHALLOWTUBE WELLS/SWIP 750,000.00 750,000.00 LIVESTOCK MULTIPLIER FARM 700,000.00 700,000.00 FRESHWATER CULTURE-TILAPIA AND FRESH WATER PRAWN (ULANG) 780,000.00 780,000.00 COFFEE, CACAO AND OTHER FRUIT TREES PLANTATION 506,000.00 506,000.00 RUBBER TREE PLANTATION 510,000.00 510,000.00 WATER SYSTEM REHABILITATION-SAGANA AT LIGTAS NA TUBIG SA LAHAT 1,500,000.00 1,500,000.00 REHABILITATION AND CONSTRUCTION OF DRAINAGE AND CANALS 2,000,000.00 2,000,000.00 PROCUREMENT OF RESCUE EQUIPMENTS 1,000,000.00 1,000,000.00 BAHAY PAG-ASA FOR CICL 1,500,000.00 1,500,000.00 PROJECTS TO BE IDENTIFIED 454,000.00 454,000.00 644 CALATRAVA 600,000.00 - - - 8,245,000.00 - - - - 1,560,000.00 - - - 2,095,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT-PROVISION OF FISHNETS 600,000.00 600,000.00 CONSTRUCTION OF 10,601 L.M. GRAVITY FED POTABLE WATER SYSTEM LEVEL II 4,100,000.00 4,100,000.00 VARIOUS PROJECTS 4,145,000.00 4,145,000.00 CONSTRUCTION/REHABILITATION OF CALATRAVA SEAWALL - CONSTRUCTION OF CONCRETE BOX CULVERT WITH STEEL TRAILINGS AND CONCRETE APPROACH - CONSTRUCTION OF 2 UNITS DAY CARE CENTERS 1,560,000.00 1,560,000.00 CONCRETING OF ACCESS ROAD 2,095,000.00 2,095,000.00 645 CONCEPCION 2,800,000.00 - - - 4,900,000.00 - - - - 1,500,000.00 - - - 3,300,000.00 12,500,000.00 VARIOUS PROJECTS 2,800,000.00 2,800,000.00 CONSTRUCTION OF MULTI-PURPOSE BUILDING - CASSAVA AND ARROWROOT PRODUCTION AND PROCESSIN G FACILITY - EXPANSION/IMPROVEMENT OF WATER SYSTEM 1,000,000.00 1,000,000.00 FLOOD CONTROL: CONTRUCTION OF CANALS/DRAINAGE AND SEAWALLS 3,900,000.00 3,900,000.00 CONSTRUCTION OF DAY CARE CENTERS AND PROVISION OF NECESSARY LEARNING MATERIALS 1,500,000.00 1,500,000.00 CONSTRUCTION AND UPGRADING OF ACCESS ROAD 3,300,000.00 3,300,000.00 646 CORCUERA 1,000,000.00 - - - 2,500,000.00 - - - - - - - - 9,000,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE - PURCHASE OF TRACTORS AND THRESHERS 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 2,500,000.00 2,500,000.00 EVACUATION FACILITY - EVACUATION CENTER IN BRGY. MABINI,CORCUERA, ROMBLON - CORE LOCAL ROAD CONSTRUCTION - CONSTRUCTION OF ACCESS ROADS 9,000,000.00 9,000,000.00 647 FERROL - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 CONSTRUCTION AND REHABILITATION OF LEVEL II POTABLE WATER SYSTEM - 648 LOOC - - - - 7,500,000.00 - - - - 3,000,000.00 - - - 2,000,000.00 12,500,000.00 CONSTRUCTION OF SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) LEVEL II 7,500,000.00 7,500,000.00 CORE LOCAL ROAD REHABILITATION: REHABILITATION OF ACCESS ROADS 3,000,000.00 3,000,000.00 VARIOUS PROJECTS 2,000,000.00 2,000,000.00 CORE LOCAL ROAD REHABILITATION: REHABILITATION OF ACCESS ROADS - 649 MAGDIWANG - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS PROJECTS 12,500,000.00 12,500,000.00 EXPANSION OF POTABLE WATER SUPPLY LEVEL II (PHASE 1) - 650 ODIONGAN 1,500,000.00 - - 4,000,000.00 2,000,000.00 - - - - 500,000.00 - - 1,000,000.00 3,500,000.00 12,500,000.00 VARIOUS PROJECTS 1,500,000.00 1,500,000.00 FISH PORT - PURCHASE OF SCHOOL FURNITURES 1,000,000.00 1,000,000.00 REPAIR OF SCHOOLS 2,000,000.00 2,000,000.00 ABOT-ALAM PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN/BARANGAY 500,000.00 500,000.00 IMPROVEMENT OF EVACUATION CENTERS (CONSTRUCTION OF 15 UNITS OF COMMUNITY KITCHENS) 1,000,000.00 1,000,000.00 SPRING DEVELOPMENT 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES 500,000.00 500,000.00 CONSTRUCTION OF ACCESS ROAD 3,500,000.00 3,500,000.00 TECHNOLOGY COMMUNITY-BASED TRAINING PROGRAM 1,000,000.00 1,000,000.00 651 ROMBLON (CAPITAL) 8,500,000.00 - - - 4,000,000.00 - - - - - - - - - 12,500,000.00 REHABILITATION OF FISH PORT 3,000,000.00 3,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS PROJECTS 5,500,000.00 5,500,000.00 COSTRUCTION OF TRADING POST - CONSTRUCTION OF LEVEL-II WATER SUPPLY SYSTEM 4,000,000.00 4,000,000.00 652 SAN AGUSTIN - - - 1,000,000.00 3,500,000.00 - - - 3,000,000.00 - - - - 5,000,000.00 12,500,000.00 REPAIR OF SUGOD ELEMENTARY SCHOOL 500,000.00 500,000.00 REPAIR OF HINUGUSAN ELEMENTARY SCHOOL 500,000.00 500,000.00 VARIOUS WATER PROJECTS 2,000,000.00 2,000,000.00 IMPROVEMENT AND REHABILITATION OF SUGOD WATER SYSTEM: LEVEL II - IMPROVEMENT AND REHABILITATION OF CARMEN WATER SYSTEM LEVEL III - CONSTRUCTION OF SEAWALL 500,000.00 500,000.00 CONSTRUCTION OG GUINTIGUI-AN RIVER CONTROL 1,000,000.00 1,000,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS (REHABILITATION OF RIZAL TOURISM PARK 3,000,000.00 3,000,000.00 CONSTRUCTION OF CORE LOCAL ROADS 5,000,000.00 5,000,000.00 653 SAN ANDRES 7,500,000.00 - - - 5,000,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DA PROJECTS 7,500,000.00 7,500,000.00 TRADING POST - UPGRADING OF LEVEL 1 TO LEVEL 2 WATER SYSTEM IN BARANGAY TAN AGAN 5,000,000.00 5,000,000.00 654 SAN FERNANDO 7,587,450.00 - - 2,070,000.00 500,000.00 - - - - 2,342,550.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 6,287,450.00 6,287,450.00 PURCHASE OF VARIOUS AGRICULTURAL EQUIPMENT (TEA BREWER, SHREDDER, RICE HULL CARBONIZER, TURTLE, THRESHER, HANDTRACTOR, SUPERKAMA 10HP, AND KUBOTA 10HP) - PURCHASE OF FARM MACHINERIES (TRACTOR WITH TRAILER, THRESHER, 10 HP HONDA ENGINE, AND 5 HP HONDA ENGINE) - CONSTRUCTION OF TRAM LINES - MOTORIZED FISHING BOAT WITH NET 800,000.00 800,000.00 SEAWEED CULTURE 500,000.00 500,000.00 FOUR-WHEEL DRIVE TRACTOR W/COMPLETE IMPLEMENTS - COLD STORAGE FACILITY - GULAYAN SA PAARALAN 140,000.00 140,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOM PROVISION OF SCHOOL FURNITURE 1,930,000.00 1,930,000.00 PURCHASE OF VARIOUS RESCUE EQUIPMENT 500,000.00 500,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 1,042,550.00 1,042,550.00 REPAIR OF DAY CARE CENTER/REHABILITATION OF DAY CARE CENTER 800,000.00 800,000.00 PROVISION OF HAND WASHING FACILITY AND HYGIENE KIT 500,000.00 500,000.00 655 SAN JOSE 3,200,000.00 - - - 8,300,000.00 - - - - - - - - 1,000,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT (MOTORIZED FISHING BOAT, FISH NETS) 500,000.00 500,000.00 ESTABLISHMENT OF MUNICIPAL NURSERY 700,000.00 700,000.00 REPAIR/REHABILITATION OF FISH PORT (SAID PORT) 2,000,000.00 2,000,000.00 VARIOUS WATER PROJECTS 8,300,000.00 8,300,000.00 UPGRADING/EXPANSION OF SAN JOSE WATER SUPPLY LEVEL III (PHASE 2) - CONSTRUCTION OF CIRCUMFERENTIAL ROAD (GRAVEL) 1,000,000.00 1,000,000.00 656 SANTA FE - - - 2,000,000.00 5,000,000.00 - - - - 1,000,000.00 - - - 4,500,000.00 12,500,000.00 REHABILITATION OF BAGONG LIPUNAN BUILDING 2,000,000.00 2,000,000.00 UPGRADING/EXPANSION OF SANTA FE POTABLE WATER SUPPLY SYSTEM, LEVEL 3 (PHASE 3) 5,000,000.00 5,000,000.00 CONSTRUCTION OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 4,500,000.00 4,500,000.00 REHABILITATION OF TIPOLO-AGMANIC ROAD - 657 SANTA MARIA - - - - 15,000,000.00 - - - - - - - - - 15,000,000.00 SALINTUBIG (CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM) 15,000,000.00 15,000,000.00 REGION V 306,135,946.57 13,713,000.00 33,652,360.00 125,517,822.00 569,836,503.00 7,100,000.00 117,283,185.09 39,217,316.00 48,219,954.33 180,927,923.50 43,156,066.00 12,460,000.00 25,202,645.44 169,166,678.07 1,691,589,400.00 ALBAY 61,431,600.00 2,000,000.00 2,700,000.00 35,566,500.00 110,903,000.00 - 17,154,000.00 15,477,900.00 3,500,000.00 36,931,000.00 8,375,000.00 - 3,200,000.00 21,261,000.00 318,500,000.00 658 BACACAY 5,469,600.00 - - - 2,000,000.00 - 5,400,000.00 1,730,400.00 - 1,900,000.00 - - - - 16,500,000.00 VARIOUS PROJECTS 2,169,600.00 2,169,600.00 CONSTRUCTION OF IRRIGATION DAM - FISHING EQUIPMENTS 2,300,000.00 2,300,000.00 MINI RICE MILL - MULTI-PURPOSE DRYING PAVEMENT - FISH PROCESSING FACILITY 1,000,000.00 1,000,000.00 IMPROVEMENT OF WATER SYSTEM OF BAYANDONG, BACACAY, ALBAY 2,000,000.00 2,000,000.00 UPGRADING OF MUNICIPAL HEALTH CENTER 5,400,000.00 5,400,000.00 SUPPORT LIVELIHOOD PROGRAM FOR MARGINALIZED SECTOR 1,730,400.00 1,730,400.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICRO-ENTERPRISE DEVELOPMENT 1,000,000.00 1,000,000.00 REPAIR/UPGRADING OF DAY CARE CENTER 900,000.00 900,000.00 659 CAMALIG 1,000,000.00 - - - 8,500,000.00 - 500,000.00 - 3,500,000.00 - - - 1,000,000.00 - 14,500,000.00 VARIOUS PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF RAMP PUMP AT BRGY TINAGO - SUSTAINABLE AGRI BASED LIVELIHOOD AND OTHER AGRI BUSINESS INVESTMENTS - ORGANIC AGRICULTURE PROGRAM CUM LIVELIHOOD - PROCUREMENT OF HEAVY EQUIPMENTS FOR EARLY RECOVERY SERVICES 5,500,000.00 5,500,000.00 CONSTRUCTION OF FLOOD CONTROL AT TAGAYTAY RIVER 3,000,000.00 3,000,000.00 ESTABLISHMENT OF ANIMAL BITE CENTER CUM TRAINING ON MANAGEMENT ON ANIMAL BITE VICTIMS AND PROCUREMENT OF ANTI-RABIES VACCINES 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF PATHWALKS AND TRAILS TO QUITUINAN HILLS IN BRGY TINAGO 1,000,000.00 1,000,000.00 ESTABLISHMENT OF VISITOR INFORMATION CENTER AT QUITUINAN HILLS IN BRGY TINAGO AND HOYOP-HOYOPAN CAVE IN BRGY COTMON 2,000,000.00 2,000,000.00 FORMULATION OF LOCAL ORDINANCES (4 CODES (MARKET, INVESTMENT/INCENTIVES, TOURISM, TAX) APPROVED AND PUBLISH 500,000.00 500,000.00 TECHNICAL VOCATIONAL TRAINING/COMMUNITY - BASED TRAINING 1,000,000.00 1,000,000.00 660 DARAGA 7,390,000.00 - - 5,800,000.00 500,000.00 - 2,079,000.00 - - 6,731,000.00 - - - - 22,500,000.00 VARIOUS DA PROJECTS 7,390,000.00 7,390,000.00 PALAY SHED - RICE PLANTER/CORN SEEDER AND HARVESTER FOR RICE AND CORN - MULTI-PURPOSE DRYING PAVEMENT - FLAT BED DRYER - TRADING POST (FOOD TERMINAL FOR ORGANIC PRODUCT) - BIO-INTENSIVE ORGANIC GARDENING/CONTAINERIZED URBAN GARDENING - ACQUISITION OF SEATS 1,400,000.00 1,400,000.00 ACQUISITION OF SEATS 1,400,000.00 1,400,000.00 REPAIR/IMPROVEMENT OF CLASSROOMS 1,500,000.00 1,500,000.00 REPAIR/IMPROVEMENT OF CLASSROOMS 1,500,000.00 1,500,000.00 STRENGTHENING/CONSOLIDATION OF CSOS 500,000.00 500,000.00 BEMONC 500,000.00 500,000.00 IMPLEMENTATION OF TB PROGRAM 522,000.00 522,000.00 RABIES PREVENTION 516,000.00 516,000.00 TRAINING ON STI/HIV/AIDS PREVENTION 541,000.00 541,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICROENTERPRISE 1,731,000.00 1,731,000.00 ESTABLISHMENT OF PDAO 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRA PROJECTS UPGRADING/REPAIR OF DCCS 3,000,000.00 3,000,000.00 CONSTRUCTION OF DCC WITH AMENITIES AND PROVISION OF ECCD LEARNING MATERIALS 1,500,000.00 1,500,000.00 661 GUINOBATAN 4,850,000.00 - - 1,150,000.00 3,000,000.00 - 3,575,000.00 2,425,000.00 - 3,000,000.00 - - - - 18,000,000.00 VARIOUS PROJECTS 3,850,000.00 3,850,000.00 PROVISION OF FARM MECHANIZATION FACILITIES AND EQUIPMENT TO FARMERS ORGANIZATION - VILLAGE LEVEL INTEGRATED COCONUT PROCESSING PLANT - SUSTAINABLE FOOD PRODUCTION USING BIO-INTENSIVE GARDENING TECHNOLOGY - ESTABLISHMENT AND OPERATION OF AGRI-LIVESTOCKS - FISHERY DEVELOPMENT CENTER 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FURNITURE (KINDERGARTEN SEATS) 500,000.00 500,000.00 PROVISION OF INSTRUCTIONAL/LEARNING MATERIALS (ABOT-ALAM PROGRAM) 650,000.00 650,000.00 PROVISION OF POTABLE WATER SUPPLY 3,000,000.00 3,000,000.00 CAPABILITY BUILDING TO NUTRITION PROVIDERS 500,000.00 500,000.00 ESTABLISHMENT OF BREAST FEEDING CORNERS 1,000,000.00 1,000,000.00 PURCHASE AND DISTRIBUTION OF TOILET BOWLS 575,000.00 575,000.00 RENOVATION AND UPGRADING OF MALIPO INFIRMARY INTO BEMONC 1,500,000.00 1,500,000.00 PROVISION OF START-UP KITS 1,125,000.00 1,125,000.00 CONDUCT OF TECHNICAL TRAINING, FOOD PROCESSING & PROVISION OF START-UP INPUT AND EQUIPMENT 1,300,000.00 1,300,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 3,000,000.00 3,000,000.00 662 JOVELLAR - - - 3,000,000.00 9,500,000.00 - - - - - - - - - 12,500,000.00 REPAIR/REHAB OF CLASSROOM 750,000.00 750,000.00 REPAIR/REHAB OF CLASSROOM 750,000.00 750,000.00 REPAIR/REHAB OF CLASSROOM 750,000.00 750,000.00 REPAIR/REHAB OF CLASSROOM 750,000.00 750,000.00 VARIOUS DILG PROJECTS 9,500,000.00 9,500,000.00 CONSTRUCTION OF EVACUATION CENTER - 663 LEGAZPI CITY - - - 12,000,000.00 4,000,000.00 - - - - 14,000,000.00 - - - - 30,000,000.00 REPAIR/REHABILITATION OF CLASSROOMS 10,000,000.00 10,000,000.00 PROVISION OF SCHOOL FURNITURE 2,000,000.00 2,000,000.00 VARIOUS WATER PRJECTS 4,000,000.00 4,000,000.00 SALINTUBIG-PROVISION OF WATER SUPPLY - VARIOUS KC PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF CRISIS CENTER - ESTABLISHMENT OF PERSONS WITH DISABILITIES AFFAIRS OFFICE (OPDA) - PROTECTIVE SERVICES/INFRASTRUCTURE PROJECT-CONST. OF EVACUATION CENTER 11,500,000.00 11,500,000.00 664 LIBON 8,500,000.00 - - 1,000,000.00 6,500,000.00 - 1,500,000.00 - - 3,500,000.00 1,500,000.00 - - - 22,500,000.00 REHAB OF IRRIGATION DAM 2,000,000.00 2,000,000.00 CONSTRUCTION OF MINI-IRRIGATION DAM 1,000,000.00 1,000,000.00 MOTORIZED FISHING BANCA WITH EQUIPMENT AND NET 1,000,000.00 1,000,000.00 PROVISION OF FARM MACHINERY WITH ENGINE 1,000,000.00 1,000,000.00 LAND CULTIVATORS WITH ENGINE 1,000,000.00 1,000,000.00 POST HARVEST FACILITIES: FLAT-BED DRYER 1,000,000.00 1,000,000.00 CONSTRUCTION OF PLANT BUILDING FOR VIRGIN COCONUT OIL (VCO) PRODUCTION 1,500,000.00 1,500,000.00 PROVISION OF EQUIPMENT AND FURNITURES 500,000.00 500,000.00 GULAYAN SA PAARALAN - GARDEN TOOLS AND SEEDS 500,000.00 500,000.00 REHAB/INSTALLATION OF POTABLE WATER SYSTEM 2,500,000.00 2,500,000.00 VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF EVACUATION CENTER CUM ACTIVITY CENTER - RIVERBANKS STABILIZATION AND SLOPE PROTECTION - CONSTRUCTION OF SEA WALL - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS DESILTING OF RIVERS AND CANALS - IMPROVEMENT OF BHS FACILITY 500,000.00 500,000.00 PROVISION OF EQUIPMENT FOR FUNCTIONAL BHS CONVERTED AS BIRTHING FACILITIES 1,000,000.00 1,000,000.00 CONSTRUCTION OF DCC WITH COMPLETE AMENITIES, PROVISION OF ECCD MATERIALS AND IMPROVEMENT OF PLAYGROUND 2,000,000.00 2,000,000.00 CONSTRUCTION OF 2-STOREY SHELTER HOME FOR ABUSED, DISPLACED, ABANDONED WOMEN AND CHILDREN (BAHAY KALINGA PROGRAM) 1,500,000.00 1,500,000.00 SKILL AND LIVELIHOOD TRAININGS, EQUIPMENTS AND MATERIALS 500,000.00 500,000.00 DEVELOPMENT OF SMALL COTTAGE INDUSTRIES AND PRODUCT DEVELOPMENT AND MARKETING 1,000,000.00 1,000,000.00 665 LIGAO CITY 10,597,000.00 2,000,000.00 - - 9,203,000.00 - - - - - 700,000.00 - - 5,000,000.00 27,500,000.00 RIPRAPPING OF IRRIGATION CANAL 2,000,000.00 2,000,000.00 HIGH VALUE CROPS DEVELOPMENT PROGRAM 1,437,000.00 1,437,000.00 FARM MECHANIZATION 7,360,000.00 7,360,000.00 NATIONAL COCONUT PRODUCTIVITY ENHANCEMENT PROGRAM - PARTICIPATORY COCONUT PLANTING PROJECT (PCPP) 800,000.00 800,000.00 NATIONAL COCONUT PRODUCTIVITY ENHANCEMENT PROGRAM - COCONUT INTERCROPPING PROJECT (CIP) 1,000,000.00 1,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 5,703,000.00 5,703,000.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 FLOOD CONTROL - SEA WALL - YAMAN PINOY 700,000.00 700,000.00 INTEGRATED FOOD PRODUCTION 5,000,000.00 5,000,000.00 666 MALILIPOT - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DILG PROJECTS 12,500,000.00 12,500,000.00 FLOOD CONTROL - SEA WALL - 667 MALINAO - - - - 6,500,000.00 - - 4,639,000.00 - - - - - 1,361,000.00 12,500,000.00 VARIOUS WATER PRJECTS 5,500,000.00 5,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - CSO STRENGTHENING 1,000,000.00 1,000,000.00 INTEGRATED LIVELIHOOD PROGRAM 4,639,000.00 4,639,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION FOR HUNGER MITIGATION 1,361,000.00 1,361,000.00 668 MANITO 3,600,000.00 - - - 3,000,000.00 - - 1,500,000.00 - - - - - 4,400,000.00 12,500,000.00 FISHING BOAT (12 UNITSX100,000) 1,200,000.00 1,200,000.00 FISH CAGES (2 UNITS/YR X 300,000) 600,000.00 600,000.00 DISTRIBUTION OF ASSORTED VEGETABLE SEEDS/PLANTING MATERIALS 600,000.00 600,000.00 ESTABLISHEMNT OF FISH SANCTUARY/MARINE RESERVES (30 HAS/AREA) 600,000.00 600,000.00 ORGANIC FERTILIZER PRODUCTION 600,000.00 600,000.00 VARIOUS DILG PROJECTS 2,400,000.00 2,400,000.00 CONSTRUCTION OF EVACUATION CENTER BUILDING - CAPABILITY BUILDING FOR CSOS 600,000.00 600,000.00 COCO COIR PRODUCTION 1,500,000.00 1,500,000.00 CONCRETING OF MANITO COMMUNITY COLLEGE & CENTRAL ELEM. SCHOOL ACCESS ROAD 2,200,000.00 2,200,000.00 CONCRETING OF NAGOTGOT HIGH SCHOOL ACCESS ROAD 2,200,000.00 2,200,000.00 669 OAS - - - 9,000,000.00 5,500,000.00 - 1,500,000.00 - - - 500,000.00 - - 1,000,000.00 17,500,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS (OAS SOUTH DISTRICT) 4,000,000.00 4,000,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS (OAS NORTH DISTRICT) 4,000,000.00 4,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM: ALTERNATIVE LEARNING SYSTEM SCHEMES (OAS SOUTH DISTRICT) 500,000.00 500,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM: ALTERNATIVE LEARNING SYSTEM SCHEMES (OAS NORTH DISTRICT) 500,000.00 500,000.00 VARIOUS WATER PROJECTS 5,500,000.00 5,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 1,000,000.00 1,000,000.00 MATERNAL NEONATAL, CHILD HEALTH NUTRITION (MNCHN): TRAINING ON HEALTH PERSONNEL ON BASIC EMERGENCY OBSTETRIC AND NEWBORN CARE (BEMONC) 500,000.00 500,000.00 ONE TOWN ONE PRODUCT (OTOP) STORE EXPRESS 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 1,000,000.00 1,000,000.00 CORE LOCAL ROAD REHABILITATION: CONCRETING OF SAN JUAN- SAN VICENTE LOCAL ACCESS ROAD - 670 PIODURAN 2,300,000.00 - 2,200,000.00 - - - - 1,000,000.00 - - - - - 9,000,000.00 14,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION & DEVELOPMENT 500,000.00 500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 800,000.00 800,000.00 MARINE PROTECTED AREAS 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM (NGP) 2,200,000.00 2,200,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM (DLIP) TUIC NG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 4,500,000.00 4,500,000.00 CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION 2,000,000.00 2,000,000.00 671 POLANGUI - - - - 19,500,000.00 - - - - - - - - - 19,500,000.00 VARIOUS DILG PROJECTS 19,500,000.00 19,500,000.00 EVACUATION FACILITY - 672 RAPU-RAPU 3,625,000.00 - - 1,360,000.00 3,640,000.00 - - - - 2,000,000.00 1,875,000.00 - - - 12,500,000.00 VARIOUS LIVELIHOOD PROJECTS 1,750,000.00 1,750,000.00 LIVELIHOOD PROJECTS - FISH SANCTUARY 1,875,000.00 1,875,000.00 GULAYAN SA PAARALAN 360,000.00 360,000.00 ALTERNATIVE LEARNING SYSTEM 1,000,000.00 1,000,000.00 WATER SYSTEM 2,000,000.00 2,000,000.00 FLOOD CONTROL 1,640,000.00 1,640,000.00 PROVISION OF ECC MATERIALS 2,000,000.00 2,000,000.00 YAMAN PINOY 1,875,000.00 1,875,000.00 673 SANTO DOMINGO 2,200,000.00 - 500,000.00 816,500.00 4,300,000.00 - 2,000,000.00 1,383,500.00 - 600,000.00 700,000.00 - - - 12,500,000.00 FISH SANCTUARY & MARINE RESERVE ESTABLISHMENT AND FISHING GEARS SUPPORT (PHASE 1) 1,000,000.00 1,000,000.00 SMALL WATER IMPOUNDING PROJECTS (SWIPS) 1,200,000.00 1,200,000.00 ESTABLISHMENT OF MUNICIPAL CLIMATE CHANGE ADAPTATION NURSERY 500,000.00 500,000.00 PROVISIONS OF ALS LEARNING MODULES (BASIC LITERACY MODULES AND ACCREDITATION & EQUIVALENCY MODULES) AND ALS PORFOLIO MATERIALS FOR OUT OF SCHOOL YOUTHS AND ADULTS OF MUNICIPALITY OF STO. NINO DOMINGO WHO ARE NON- COMPLETERS OF BASIC 816,500.00 816,500.00 VARIOUS WATER PRJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF SAN FERNANDO-SANTA TERESITA MISERICORDIA WATER SYSTEM LEVEL (PHASE 1) - COSNTRUCTION OF SAFE EVACUATION CENTER 1,800,000.00 1,800,000.00 HFEP-BSR 1,500,000.00 1,500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNNCHN) 500,000.00 500,000.00 INTEGRATED LIVELIHOOD PROGRAM FOR INDIGENT SENIOR CITIZENS 1,383,500.00 1,383,500.00 CAPABILITY BUILDING FOR DAY CARE WORKERS 600,000.00 600,000.00 YAMAN PINOY 700,000.00 700,000.00 674 TABACO CITY 4,400,000.00 - - 1,440,000.00 11,760,000.00 - 600,000.00 1,200,000.00 - 5,200,000.00 1,200,000.00 - 2,200,000.00 - 28,000,000.00 VARIOUS DA PROJECTS 4,400,000.00 4,400,000.00 COLD STORAGE - BARANGAY BASED ORGANIC FARMING - ADDITIONAL SCHOOL FRUNITURES & FIXTURES 1,440,000.00 1,440,000.00 LEVEL II WATER SYSTEM 3,160,000.00 3,160,000.00 EVACUATION FACILITY 8,000,000.00 8,000,000.00 CSOS CAPACITY BUILDING ON ORGANIZATION DIAGNOSIS FOR ALL SECTORS 600,000.00 600,000.00 CAPACITY BUILDING FOR HEALTH WORKERS & PARTNERS 600,000.00 600,000.00 WELDING SHOP & REPAIR CUM SPARE PARTS BUSINESS 1,200,000.00 1,200,000.00 YOUTH HOME 5,200,000.00 5,200,000.00 ALTERNATIVE LIVELIHOOD PROGRAM FOR FISHERFOLKS 1,200,000.00 1,200,000.00 TECHNICAL VOCATIONAL;TRAINING/COMMUNITY BASED TRAININGS 2,200,000.00 2,200,000.00 675 TIWI 7,500,000.00 - - - 1,000,000.00 - - 1,600,000.00 - - 1,900,000.00 - - 500,000.00 12,500,000.00 VARIOUS FISHERY PROJECTS 7,000,000.00 7,000,000.00 CONSTRUCTION OF TUNA/FISH LANDING SITE - ORGANIC AGRICULTURE PROGRAM 500,000.00 500,000.00 CAPABILITY BUILDING FOR CSOS 1,000,000.00 1,000,000.00 INTEGRATED LIVELIHOOD PROGRAM 1,100,000.00 1,100,000.00 EMERGENCY & SHORT TERM EMPLOYMENT 500,000.00 500,000.00 MICRO ENTERPRISE DEVELOPMENT PROGRAM 1,200,000.00 1,200,000.00 COMMUNITY LEVEL CAPABILITY/LIVELIHOOD PROGRAM 700,000.00 700,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 CAMARINES NORTE 27,330,000.00 - 6,265,400.00 10,180,000.00 49,977,000.00 - 14,436,500.00 2,002,500.00 9,500,000.00 7,428,000.00 7,300,000.00 - 1,000,000.00 23,580,000.00 158,999,400.00 676 BASUD 2,250,000.00 - - - 6,850,000.00 - - - - - - - - 3,400,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 2,250,000.00 2,250,000.00 VARIOUS WATER PROJECTS 5,500,000.00 5,500,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II (PHASE III) - CONSTRUCTION OF FOOT BRIDGE 1,350,000.00 1,350,000.00 REHABILITATION OF LOCAL ROADS 3,400,000.00 3,400,000.00 677 CAPALONGA 3,800,000.00 - 1,500,000.00 - 5,200,000.00 - - - 2,000,000.00 - - - - - 12,500,000.00 LIVELIHOOD FOR FISHERFOLKS (FISHING GEARS/IMPLEMENTERS) 500,000.00 500,000.00 VARIOUS DA PROJECTS 3,300,000.00 3,300,000.00 PURCHASE OF FOUR-WHEEL TRACTOR/FARM IMPLEMENTERS/TOOLS - CONSTRUCTION OF MECHANICAL DRIER - ESTABLISHMENT OF MULTIPURPOSE DRYING PAVEMENT/POST HARVEST FACILITIES - DUCK RAISING/SALTED EGG PRODUCTION - BIOLOGICAL PEST CONTROL LABORATORY PROJECT - ORGANIC FERTILIZER PRODUCTION PROJECT - MANGROVE REFORESTATION PROJECT (IN SUPPORT OF FISH SANCTUARY) 500,000.00 500,000.00 RUBBER TREE PLANTATION PROJECT 500,000.00 500,000.00 TREE PLANTING ALONG RIVER BANKS- RIPARIAN BUFFER ZONE (DISASTER MITIGATION) 500,000.00 500,000.00 CONSTRUCTION OF WATER SYSTEM 2,000,000.00 2,000,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS FLOOD CONTROL/RIPRAPPING/RIVER PROTECTION PROJECT 1,200,000.00 1,200,000.00 BAYWALK SITE DEVELOPMENT PROJECT (PHASE II) 2,000,000.00 2,000,000.00 678 DAET 950,000.00 - - 1,790,000.00 1,750,000.00 - 3,002,500.00 1,502,500.00 1,000,000.00 505,000.00 2,000,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 950,000.00 950,000.00 ESTABLISHMENT OF KASAGANAAN SA NIYUGAN AY KAUNLARAN NG BAYAN (KAANIB) ENTERPRISE DEVELOPMENT PROJECT - ESTABLISHMENT OF AQUASILVI PROJECT - REHABILITATION OF CLASSROOMS IN GOTIO PIMENTEL ELEMENTARY SCHOOL 1,190,000.00 1,190,000.00 ABOT ALAM PROGRAM 600,000.00 600,000.00 EXTENSION OF LEVEL III POTABLE WATER SYSTEM 1,750,000.00 1,750,000.00 PURCHASE OF MEDICAL EQUIPMENT FOR BEMONC FACILITY 3,002,500.00 3,002,500.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGE WORKERS (TUPAD) 1,000,000.00 1,000,000.00 CAREER AND EMPOWERMENT COACHING, SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENT, SKILLS REGISTRATION SYSTEM AND JOBS FAIR PROGRAM 502,500.00 502,500.00 PRODUCTION OF TRI-MEDIA ADVERTISING AND PROMOTIONAL MATERIALS FOR LOCAL TOURISM DEVELOPMENT 1,000,000.00 1,000,000.00 TRAINING OF DAY CARE WORKERS (DCW) AND PROVISION OF EARLY CHILDHOOD CARE AND DEVELOPMENT (ECCD) MATERIALS 505,000.00 505,000.00 YAMANPINOY DAET SOUTH 700,000.00 700,000.00 YAMANPINOY DAET NORTH 700,000.00 700,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT 600,000.00 600,000.00 679 JOSE PANGANIBAN 3,000,000.00 - 500,000.00 1,500,000.00 2,500,000.00 - 1,500,000.00 500,000.00 1,000,000.00 1,000,000.00 1,000,000.00 - - - 12,500,000.00 VARIOUS PROJECTS 500,000.00 500,000.00 PINEAPPLE/COCO CHIPS & SUKA MAKING FOR AGRO PROCESSING FACILITIES - ACQUISITION OF POST HARVEST FACILITIES FOR FARMERS - SUSTAINABLE AGRI-FISHERY DEVELOPMENT PROGRAM FOR HATCHERY 500,000.00 500,000.00 FISH PROCESSING PROJECT (TINAPA/TUYO) (PHASE II) 500,000.00 500,000.00 ALTERNATIVE LIVELIHOOD PROGRAM FOR FISHERMAN @13 COASTAL BRGYS. 500,000.00 500,000.00 ARTIFICIAL CORAL REEF & MANGROVE REHAB PROJECTS ALONG MAMBULAO BAY 500,000.00 500,000.00 PRODUCTION OF ORGANIC FERTILIZER OUT OF BIODEGRADABLE WASTE MATERIALS 500,000.00 500,000.00 MASSIVE REFORESTATION PROGRAM SUCH AS HARD TREES,FRUIT BEARING TREES & BAMBOO 500,000.00 500,000.00 REPAIR OF SCHOOL BUILDINGS FOR EAST & WEST DISTRICT BARANGAYS 500,000.00 500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 ASSISTANCE TO ALS PROGRAMS FOR CLASSES EXPANSION 500,000.00 500,000.00 CONST. OF WATER SYSTEM FACILITIES FOR 1 BRGY 1,000,000.00 1,000,000.00 PURCHASE OF ONE (1) UNIT EMERGENCY RESCUE VEHICLE FOR DISASTER PREPAREDNESS 1,500,000.00 1,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (CONSTRUCTION & REPAIR OF BHS BUILDINGS 1,000,000.00 1,000,000.00 TRAINING ON CHT MOBILIZATION, MALARIA CONTROL, STI/HIV/AIDS, DENGUE & HEMS 500,000.00 500,000.00 DLIP/DLEEP WORKERS INCOME AUGMENTATION PROGRAM 500,000.00 500,000.00 TOURISM DEVELOPMENT FOR BRGY. PAG ASA BEACH RESORT 500,000.00 500,000.00 TOURISM DEVELOPMENT FOR BRGY. SALVACION ISLA NI CION BEACH RESORT 500,000.00 500,000.00 CONSTRUCTION/REPAIR OF MUNICIPAL DAY CARE CENTERS 1,000,000.00 1,000,000.00 YAMAN PINOY 500,000.00 500,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM (CAPACITY BUILDING AND SKILLS TRAINING) 500,000.00 500,000.00 680 LABO 1,000,000.00 - - 1,530,000.00 4,203,000.00 - 4,344,000.00 - - 2,923,000.00 1,500,000.00 - - 6,000,000.00 21,500,000.00 AGRO-PROCESSING FACILITIES:ESTABLISHMENT OF PRODUCTION FACILITIES FOR HIGH VALUE CROPS (CACAO,COFFEE,PINEAPPLE,PILI, COCONUT & SUGARCANE) 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 REPAIR & IMPROVEMENT OF VARIOUS SCHOOL BUILDINGS - REHABILITATION OF 3 CLASSROOM BUILDINGS FOR 6 VARIOUS ELEM SCHOOLS, 3 CLASSROOM BUILDINGS FOR 3 VARIOUS SECONDARY SCHOOLS 900,000.00 900,000.00 PROVISION OF SCHOOL FURNITURES A. PROVISION OF 600 SEATS FOR 6 ELEM SCHOOLS B. PROVISION OF 300 SEATS FOR SECONDARY SCHOOLS 630,000.00 630,000.00 VARIOUS WATER PROJECTS 4,203,000.00 4,203,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY - COMMUNITY HEALTH TEAM MOBILIZATION 600,000.00 600,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM A. CONSTRUCTION OF BRGY. HEALTH STATION & PROVISION OF BASIC MEDICAL EQUIPMENTS FOR BRGY BAKIAD HEALTH STATION COVERING THE AREA BRGYS SANTA TERESITA CRUZ,BAKIAD,CABUSAY 848,000.00 848,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM B. CONSTRUCTION OF BRGY. HEALTH STATION & PROVISION OF BASIC MEDICAL EQUIPMENTS FOR BRGY MASALONG HEALTH STATION COVERING THE AREA BRGYS TALOBATIB,MAHAWANHAWAN,MASALONG 848,000.00 848,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM C. CONSTRUCTION OF BRGY. HEALTH STATION & PROVISION OF BASIC MEDICAL EQUIPMENTS FOR BRGY MABILO HEALTH STATION COVERING THE AREA BRGYS ANAHAW,MABILO 1 & MABILO 2 848,000.00 848,000.00 RN HEALS: NURSE DEPLOYMENT PROGRAM 1,200,000.00 1,200,000.00 SUSTAINABLE LIVELIHOOD (SLP) MICROENTERPRISE DEVT. TRACK 778,000.00 778,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS I. PROTECTIVE SERVICES (INFRASTRUCTURE PROJECTS) - 1ST PHASE - REPAIR/UPGRADING OF DAY CARE CENTER AND PROVISION OF GROUP HANDWASHING FACILITY 1,550,000.00 1,550,000.00 PROTECTIVE SERVICES (CAPABILITY BUILDING) - 1ST PHASE A. CAPABILITY BUILDING FOR DAY CARE WORKERS & PROVISION OF HYGIENE KIT/MATERIALS FOR DAY CARE CENTERS & SUPERVISED NEIGHBORHOOD PLAYGROUPS (SNPS) SITES 595,000.00 595,000.00 YAMANPINOY - COCONUT 500,000.00 500,000.00 YAMANPINOY - ABACA 500,000.00 500,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM (CAPACITY BUILDING & SKILLS TRAINING) 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 1,500,000.00 1,500,000.00 CONCRETING OF DALAS CORE LOCAL ROAD PROJECT - CONCRETING OF B. SILANG 2-B. SILANG 3 CORE LOCAL ROAD PROJECT - CONCRETING OF FUNDADO-SANTA TERESITA CRUZ CORE LOCAL ROAD PROJECT - CONCRETING OF TIGBINAN CORE LOCAL ROAD PROJECT - CONCRETING OF GUISICAN CORE LOCAL ROAD PROJECT - CONCRETING OF MALANGCAOBASUD-CALABASA CORE LOCAL ROAD 1,000,000.00 1,000,000.00 CONCRETING OF CALABASA-MALANGCAOBASUD CORE LOCAL ROAD 1,000,000.00 1,000,000.00 CONCRETING OF CALABASA-PAG-ASA CORE LOCAL ROAD PROJECT 1,000,000.00 1,000,000.00 CONCRETING OF PANGPANG-MALANGCAOBASUD CORE LOCAL ROAD PROJECT 500,000.00 500,000.00 CONCRETING OF BAKIAD CORE LOCAL ROAD PROJECT 500,000.00 500,000.00 CONCRETING OF TULAY NA LUPA-BAAY CORE LOCAL ROAD PROJECT 500,000.00 500,000.00 681 MERCEDES 2,000,000.00 - 2,220,000.00 1,780,000.00 4,000,000.00 - - - - - - - - 2,500,000.00 12,500,000.00 IRRIGATION PROJECTS (CONSTRUCTION OF SMALL WATER IMPOUNDING PROJECT 2,000,000.00 2,000,000.00 NATIONAL GREENING PROGRAM (AGRO-FORESTRY PROJECT) 1,175,000.00 1,175,000.00 NATIONAL GREENING PROGRAM (MANGROVE REFORESTATION) 1,045,000.00 1,045,000.00 BASIC EDUCATION FACILITIES: REPAIR/ REHABILITATION OF SCHOOL CLASSROOMS 1,520,000.00 1,520,000.00 GULAYAN SA PAARALAN 260,000.00 260,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) (CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM INCLUDING APPROPRIATE WATER TREATMENT SYSTEM) 4,000,000.00 4,000,000.00 VARIOUS ROAD PROJECTS 2,500,000.00 2,500,000.00 CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION (CONCRETING OF COLASI TO LANOT ROAD SECTION) - 682 PARACALE 500,000.00 - - 2,000,000.00 9,000,000.00 - 1,000,000.00 - - - - - - - 12,500,000.00 PROCUREMENT OF PRE AND POST HARVEST MACHINERIES AND FACILITIES 500,000.00 500,000.00 REHABILITATION OF SCHOOL BUILDING AT PARACALE NATIONAL HIGH SCHOOL 1,000,000.00 1,000,000.00 REHABILITATION OF SCHOOL BUILDING AT PARACALE NATIONAL HIGH SCHOOL 500,000.00 500,000.00 REHABILITATION OF SCHOOL BUILDING AT BATOBALANI NATIONAL HIGH SCHOOL 500,000.00 500,000.00 CONSTRUCTION OF WATER SYSTEM AT BARANGAY PALANAS 1,500,000.00 1,500,000.00 VARIOUS PROJECTS 7,500,000.00 7,500,000.00 CONSTRUCTION OF EVACUATION CENTERS - CONSTRUCTION OF DRAINAGE SYSTEM - PROCUREMENT OF MEDICINE/SUPPLIES TRAINING OF HEALTH WORKERS/VOLUNTEERS 500,000.00 500,000.00 UPGRADING OF BARANGAY HEALTH STATIONS AT BARANGAY MACOLABO 500,000.00 500,000.00 683 SAN LORENZO RUIZ 1,500,000.00 - 1,500,000.00 500,000.00 2,500,000.00 - - - 3,000,000.00 3,000,000.00 - - - 500,000.00 12,500,000.00 VARIOUS PROJECTS 1,500,000.00 1,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND DEVELOPMENT PURCHASE OF FARM EQUIPMENT - AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES ESTABLISHMENT OF PINEAPPLE PROCESSING - HIGH VALUED CROP DEVELOPMENT - NATIONAL GREENING PROGRAM (REFORESTATION OF UPLAND AREAS PROGRAM AND MAINTENACE) 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES A. PROVISION OF FUNDS FOR CHAIR REPAIRS AND OTHER SCHOOL FURNITURE 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY A. REHABILITATION AND CONSTRUCTION OF WATER SYSTEM 2,000,000.00 2,000,000.00 RESCUE EQUIPMENT PURCHASE OF DISASTER EQUIPMENT 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECT A. DEVELOPMENT AD PROMOTION OF TOURISM SITES OF SAN LORENZO RUIZ SPECIFICALLY NACALI FALLS, SLR HIGHLANDS AND SLR INLAND BODIES OF WATER 3,000,000.00 3,000,000.00 PROTECTIVE SERVICES A. CONSTRUCTION OF CRISIS CENTER FOR WOMEN AND CHILDREN 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES CONSTRUCTION AND REHABILITATION OF DAY CARE 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION (CONCRETING OF FOOTBRIDGE) 500,000.00 500,000.00 684 SAN VICENTE 1,500,000.00 - - 80,000.00 3,420,000.00 - - - - - - - - 7,500,000.00 12,500,000.00 ESTABLISHMENT OF MUNICIPAL TECHNO DEMO FARM ON INTEGRATED FARMING 1,000,000.00 1,000,000.00 ESTABLISHMENT OF TILAPIA HATCHERY PROJECT 500,000.00 500,000.00 GULAYAN SA PAARALAN 80,000.00 80,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROCUREMENT OF RESCUE VEHICLE PACKAGEDR WITH BASIC RESCUE AND RESPONSE EQUIPMENTS 1,420,000.00 1,420,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 VARIOUS ROAD PROJECTS 7,500,000.00 7,500,000.00 CONCRETING OF SAN VICENTE TO SAN JOSE ROAD SECTION - 685 SANTA ELENA 1,620,000.00 - - - 2,610,000.00 - 4,590,000.00 - - - - - - 3,680,000.00 12,500,000.00 LAPU-LAPU CULTURE IN MARINE CAGES 540,000.00 540,000.00 ESTABLISHMENT OF SEED MULTIPLIER FARM WITH POST HARVEST FACILITIES 540,000.00 540,000.00 PROMOTION DEVELOPMENT OF ORGANIC FERTILIZER PRODUCTION 540,000.00 540,000.00 PROVISION OF POTABLE WATER SUPPLY 2,610,000.00 2,610,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 540,000.00 540,000.00 DOH-HEALTH FACILITIES ENHANCEMENT PROGRAM 1,800,000.00 1,800,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,250,000.00 2,250,000.00 VAIOUS ROAD PROJECTS 3,680,000.00 3,680,000.00 CORE LOCAL ROAD CONSTRUCTION OF FMR - 686 TALISAY 550,000.00 - - 1,000,000.00 4,650,000.00 - - - 2,500,000.00 - 2,800,000.00 - 1,000,000.00 - 12,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 550,000.00 550,000.00 REHABILITATION OF SCHOOL BUILDING DESIGNATED AS EVACUATION CENTER 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 4,100,000.00 4,100,000.00 REHABILITATION OF BINANUAAN-SAN FRANCISCO HANGING FOOTBRIDGE - REHABILITATION OF BINANUAAN-SAN NICOLAS TULAY NG PANGULO - REHABILITATION OF CAHABAAN-GABON FARM BRIDGE - PROCUREMENT OF RESCUE VEHICLE/PATROL BOAT AND EQUIPMENTS - CONSTRUCTION OF CRUCERO DRAINAGE CANAL - RIVER CONTROL - RIP-RAPPING OF CREEKS IN BRGY. POBLACION - CAPACITY BUILDING FOR CSOS 550,000.00 550,000.00 CONSTRUCTION OF CULTURAL HERITAGE CENTER 2,500,000.00 2,500,000.00 YAMANPINOY 600,000.00 600,000.00 NOVELTY ITEMS PRODUCTION FOR WOMEN 1,000,000.00 1,000,000.00 LOCAL ECONOMIC DEVELOPMENT 600,000.00 600,000.00 FACILITATION OF THE LGU'S PREPARATION OF MUNICIPAL INVESTMENT PLAN AND CODE AND BUSINESS PERMITS AND LICENSING SYSTEM 600,000.00 600,000.00 COMMUNITY SKILLS TRAINING 1,000,000.00 1,000,000.00 687 VINZONS 8,660,000.00 - 545,400.00 - 3,294,000.00 - - - - - - - - - 12,499,400.00 VARIOUS PROJECTS 6,740,000.00 6,740,000.00 HAND TRACTOR AND PALAY THRESHER - PROVISON OF SMALL FISHING BOAT AND FISH NETS 1,920,000.00 1,920,000.00 FLATBED MECHANICAL DRYER - MANGROVE REHABILITATION 545,400.00 545,400.00 VARIOUS DILG PROJECTS 3,294,000.00 3,294,000.00 EVACUATION FACILITIES - RESCUE EQUIPMENT - CAMARINES SUR 105,126,165.20 2,700,000.00 11,886,960.00 21,639,400.00 184,306,030.00 5,000,000.00 29,448,813.09 13,078,000.00 11,023,900.00 46,243,200.00 12,450,000.00 9,960,000.00 9,299,130.44 101,836,401.27 563,998,000.00 688 BAAO - - 3,000,000.00 - - 5,000,000.00 - - - 3,250,000.00 1,250,000.00 - - - 12,500,000.00 NATIONAL GREENING PROGRAM (AGROFORESTRY) 3,000,000.00 3,000,000.00 SOLAR HOUSEHOLD ELECTRIFICATION PROGRAM 5,000,000.00 5,000,000.00 ESTABLISHMENT OF LIVELIHOOD & SKILLS DEVELOPMENT CENTER 2,000,000.00 2,000,000.00 VARIOUS DSWD PROJECTS 1,250,000.00 1,250,000.00 CONSTRUCTION OF STANDARDIZED DAY CARE CENTER - SHARED SERVICE FACILITY (LIVELIHOOD PROG) 1,250,000.00 1,250,000.00 689 BALATAN 9,500,000.00 - 2,000,000.00 - 1,000,000.00 - - - - - - - - - 12,500,000.00 VARIOUS PROJECTS 4,500,000.00 4,500,000.00 INFRA. SUPPORT TO AGRI.& FISHERY DEV. & PRODUCTION (PURCHASE OF 290 MOTORIZED FISHING BOAT AND FISHING NETS) - AGRIO. PROCESSING FACILITIES & EXPANDED AGRI BUSINESS ACTIVITIES 3,000,000.00 3,000,000.00 COLD STORAGE FACILITIES/COMMON FACILITIES 2,000,000.00 2,000,000.00 NATIONAL GREENING PROGRAM 2,000,000.00 2,000,000.00 CAPACITY BUILDING FOR CSOS 1,000,000.00 1,000,000.00 690 BATO 3,000,000.00 - - - 4,500,000.00 - 3,000,000.00 - - 2,000,000.00 - - - - 12,500,000.00 CONSTRUCTION OF FISH IMPOUNDING PEN & PANGASIUS & CARP HATCHERY 2,000,000.00 2,000,000.00 PROCUREMENT OF MOTORIZED FISHING BOATS 500,000.00 500,000.00 PROCUREMENT OF 5 UNITS HAND TRACTOR 500,000.00 500,000.00 CONSTRUCTION & REHABILITATION OF POTABLE WATER SYSTEM 2,000,000.00 2,000,000.00 VARIOUS PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF EVACUATION FACILITY - PROVISION OF TRAINING ON BEMONC 500,000.00 500,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 1,500,000.00 1,500,000.00 UPGRADING OF RURAL HEALTH UNIT 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTERS 2,000,000.00 2,000,000.00 691 BOMBON 4,500,000.00 - - - 5,000,000.00 - - - - 1,500,000.00 - - - 1,500,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE 3,000,000.00 3,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS - PHASE I 1,500,000.00 1,500,000.00 VARIOUS PROJECTS 5,000,000.00 5,000,000.00 CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF DRAINAGE CANAL - SUSTAINABLE LIVELIHOOD PROGRAM - PHASE I 1,500,000.00 1,500,000.00 ROAD CONCRETING - SAN ANTONIO - SAN FRANCISCO ROAD 1,500,000.00 1,500,000.00 692 BUHI 1,000,000.00 - - - 3,131,000.00 - 3,595,500.00 1,000,000.00 2,673,500.00 600,000.00 1,000,000.00 6,000,000.00 1,500,000.00 - 20,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS DA PROJECTS 1,000,000.00 1,000,000.00 AGRO PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES - TRADING POST (MUNICIPAL FOOD TERMINAL/CENTRALIZED FISH VENDING ) PHASE 2 FY 2015 - VARIOS WATER PROJECTS 3,131,000.00 3,131,000.00 IMPROVE LEVEL 2 POTABLE WATER SUPPLY IN 3 BGYS. - UPGRADED BHS OF BARANGAY STA JUSTINA LABAWON & LOS ANGELES 3,595,500.00 3,595,500.00 DOLE INTEGRATED LIVELIHOOD PROGRAM( DILP) PHASE 1 1,000,000.00 1,000,000.00 3 TOURISM SPOT DEVELOP AND/OR RESTORED LOCAL FESTIVALS 2,673,500.00 2,673,500.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO-ENTERPRISE DEVELOPMENT TRACK 600,000.00 600,000.00 YAMAN PINOY ( PHASE 1) 1,000,000.00 1,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 6,000,000.00 6,000,000.00 TRAINING ON AUTOMOTIVE SERVICING 500,000.00 500,000.00 TRAINING ON SHIELDED METAL ARC WELDING 500,000.00 500,000.00 TRAINING ON BAKING PASTY PRODUCTION 500,000.00 500,000.00 693 BULA 3,075,600.00 - 500,000.00 1,080,000.00 1,710,000.00 - 1,027,400.00 - - - - - 2,160,000.00 9,945,000.00 19,498,000.00 VARIOUS PROJECTS 3,075,600.00 3,075,600.00 IRRIGATION PROJECTS - HIGH VALUE CROPS DEVELOPMENT PROGRAM - NATIONAL GREENING PROGRAM: FOREST LAND & RIVERBANKS 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: REPAIR OF CLASSROOMS 540,000.00 540,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION:SPED & OHS 540,000.00 540,000.00 FLOOD CONTROL: CONSTRUCTION OF CANALS/DRAINAGE 1,710,000.00 1,710,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 941,850.00 941,850.00 PROVISION OF TOILET FACILITIES 85,550.00 85,550.00 CORE LOCAL ROAD CONSTRUCTION 9,945,000.00 9,945,000.00 TECHNICAL VOCATIONAL TRAINING 2,160,000.00 2,160,000.00 694 CABUSAO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 SALINTUBIG PROJECT 9,850,000.00 9,850,000.00 VARIOUS DILG PROJECTS 2,650,000.00 2,650,000.00 CONSTRUCTION OF 2-STOREY EVACUATION FACILITY AT CASTILLO - CONSTRUCTION OF 2-STOREY EVACUATION FACILITY AT SANTA TERESITA LUTGARDA - CONSTRUCTION OF DRAINAGE CANAL AT GK VILLAGE & ZONE 3 OF BRGY CASTILLO - 695 CALABANGA 3,740,000.00 - - 425,000.00 12,800,000.00 - - 2,125,000.00 - 850,000.00 - 1,560,000.00 - - 21,500,000.00 PROCUREMENT OF ONE 4WD TRACTORS 2,040,000.00 2,040,000.00 SUSTAINABLE MARINE RESERVE & FISH SANCTUARIES DEVELOPMENT 1,700,000.00 1,700,000.00 GULAYAN SA PAARALAN 425,000.00 425,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY PROJECT 850,000.00 850,000.00 VARIOUS PROJECTS 7,700,000.00 7,700,000.00 CONSTRUCTION OF EVALUATION FACILITY (3 UNITS STANDARD EVACUATION CENTERS W/TOILETS FOR MEN & WOMEN & PWDS @ 3M/UNIT - PROCUREMENT OF RESCUE EQUIPMENT PRESCRIBED BY OCD/DND - REHABILITATION OF DRAINAGE CANAL (POBLACION AREA 6 BRGYS) 4,250,000.00 4,250,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 2,125,000.00 2,125,000.00 CONSTRUCTION & REHABILITATION OF DAY CARE CENTERS 850,000.00 850,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,560,000.00 1,560,000.00 696 CAMALIGAN 5,800,000.00 - - 693,000.00 2,000,000.00 - 1,350,000.00 1,557,000.00 - 1,100,000.00 - - - - 12,500,000.00 IMPROVEMENT OF WHARF AND BOULEVARD 4,500,000.00 4,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENT 800,000.00 800,000.00 DEMO FARM 500,000.00 500,000.00 REPAIR OF CLASSROOM 630,000.00 630,000.00 GULAYAN SA PAARALAN 63,000.00 63,000.00 VARIOUS DILG PROJECTS 2,000,000.00 2,000,000.00 FLOOD CONTROL - REPAIR OF CANALS/DRAINAGE AND CONSTRUCTION OF FLOOD CATCHMENT AND DESILTATION OF CIRCUMFERENTIAL CREEKS (PHASE 1) - ANTI-TB COMBAT (CAT 3) 810,000.00 810,000.00 RABIES ELIMINATION 540,000.00 540,000.00 PROVISION OF STARTER KIT (SEWING MACHINES AND TEXTILES) FOR T-SHIRT AND SANDOS PRODUCTION 1,557,000.00 1,557,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 600,000.00 600,000.00 CONSTRUCTION/INSTALLATION OF GROUP HANDWASHING FACILITIES 500,000.00 500,000.00 697 CANAMAN 4,370,000.00 - - 1,235,000.00 3,763,000.00 - 1,346,000.00 586,000.00 - 500,000.00 - - 700,000.00 - 12,500,000.00 PUMP IRRIGATION SYSTEMS FOR OPEN SOURCE (PISOS) 500,000.00 500,000.00 PROVISION OF POST-HARVEST FACILITIES & EQUIPMENT 900,000.00 900,000.00 ESTABLISHMENT OF INTEGRATED FARMING SYSTEM/PALAYAMANAN FARMS 950,000.00 950,000.00 ESTABLISHMENT OF ORGANIC SWINE RAISING PROJECT 500,000.00 500,000.00 AGRI-FISHERY TRAININGS 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 520,000.00 520,000.00 PURCHASE OF SUPPORT MATERIALS TO ALS 500,000.00 500,000.00 PURCHASE OF FURNITURE (CHAIRS) 735,000.00 735,000.00 VARIOUS PROJECTS 3,763,000.00 3,763,000.00 EXPANSION OF CP WASH PROGRAM: THROUGH RAIN WATER COLLECTION COMBINED WITH IRON REMOVAL FILTER - CONSTRUCTION OF EVACUATION CENTER - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REHABILITATION DESILTING OF DRAINAGE CANALS, AND FLOOD CONTROL: CONSTRUCTION OF OPEN LINED DRAINAGE CANAL ALONG DPH BOULEVARD - ENHANCED LOCAL HEALTH SERVICES THROUGH ENHACEMENT TRAINING OF RHU STAFF AND DEPLOYMENT OF NURSES AND MIDWIVES 1,346,000.00 1,346,000.00 LIVELIHOOD & EMPLOYMENT START-UP ASSISTANCE PROGRAM 586,000.00 586,000.00 ENHANCEMENT OF DAY CARE SERVICES THROUGH CAPACITY BUILDING OF DAY CARE SERVICE PROVIDERS AND PROVISION OF ECCD MATERIALS 500,000.00 500,000.00 LIVELIHOOD SUPPORT PROGRAM THROUGH LIVELIHOOD SKILLS TRAINING AND UPGRADING 700,000.00 700,000.00 698 CARAMOAN - - - - 14,500,000.00 - - - - - - - - - 14,500,000.00 VARIOUS PROJECTS 14,500,000.00 14,500,000.00 FOOD CONTROL PROJECT CANAL EXCAVATION - CONSTRUCTION OF DRAINAGE CANAL - 699 DEL GALLEGO 800,000.00 - - 999,600.00 6,800,000.00 - 1,000,000.00 - 1,000,400.00 1,200,000.00 700,000.00 - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 800,000.00 800,000.00 BASIC EDUCATION FACILITIES (PROVISION OF SCHOOL FURNITURE 999,600.00 999,600.00 VARIOUS WATER PROJECTS 6,800,000.00 6,800,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY PROJECT - HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS 1,000,400.00 1,000,400.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS - CONSTRUCTION OF 1 UNIT BAHAY PAG ASA FOR CICL 1,200,000.00 1,200,000.00 YAMAN PINOY -PRODUCTION DEVELOPMENT & MARKETING 700,000.00 700,000.00 700 GAINZA - - 1,526,960.00 750,000.00 6,623,040.00 - - - - - 600,000.00 - - 3,000,000.00 12,500,000.00 RIVER BANK STABILIZATION 1,526,960.00 1,526,960.00 REPAIR OF SCHOOL BUILDINGS 750,000.00 750,000.00 VARIOUS PROJECTS 6,623,040.00 6,623,040.00 REHAB. OF 2 UNITS HANGING FOOTBRIDGE - FLOOD CONTROL - REHAB OF 2 UNITS EVACUATION CENTER - YAMAN PINOY 600,000.00 600,000.00 LOCAL ROAD CONSTRUCTION & CONCRETING 3,000,000.00 3,000,000.00 701 GARCHITORENA 7,000,000.00 - - - 5,500,000.00 - - - - - - - - - 12,500,000.00 AGRO PROCESSING FACILITIES & EXPANDED AGRIBUSINESS ACTIVITIES 3,700,000.00 3,700,000.00 SUSTAINABLE AGRI FISHERY BASED LIVELIHOOD & OTHER AGRI FISHERY BUSINESS INVESTMENTS 2,300,000.00 2,300,000.00 MARINE RESERVE & FISH SANCTUARIES 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 4,500,000.00 4,500,000.00 EVACUATION FACILITY CUM ECONOMIC & LIVELIHOOD CENTER - CAPABILITY BUILDING FOR CSOS 1,000,000.00 1,000,000.00 702 GOA - - - - 11,000,000.00 - - - - - - - - 3,500,000.00 14,500,000.00 ESTABLISHMENT OF WATER WORKS SYSTEM 11,000,000.00 11,000,000.00 VARIOUS ICFP PROJECTS 3,500,000.00 3,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION - 703 IRIGA CITY 9,200,000.00 - - - 6,500,000.00 - - 2,800,000.00 - 2,500,000.00 500,000.00 - - - 21,500,000.00 VARIOUS PROJECTS 9,200,000.00 9,200,000.00 SUSTAINABLE AGRICULTURE DEVELOPMENT PROGRAM - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG)-PROVISION OF POTABLE WATER SUPPLY. IMPROVEMENT AND EXPANSION OF BRWSS 3,000,000.00 3,000,000.00 CONSTRUCTION OF DRAINAGE CANAL 3,000,000.00 3,000,000.00 CAPACITY BUILDING FOR CSOS OF IRIGA (PROVISION OF MODULAR TRAINING AND EXPOSURE) 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM (DILP)-TUPAD: PROVISION OF CONTINUING TECH-VOC WITH LIVELIHOOD PROGRAM (OSY,PWDS HOUSEWIVES, SOLO PARENTS) INCLUDING PT AND OT 2,800,000.00 2,800,000.00 DEVELOPMENT/CAPABILITY BUILDING OF DAY CARE CENTERS AND SOCIAL WORKERS 2,500,000.00 2,500,000.00 YAMAN PINOY: PROVISION OF LIVELIHOOD PROGRAMS FOR URBAN POOR AND MARGINALIZED SECTOR (BARANGAY BASED)-JEWELRY MAKING/BEADS/HANDICRAFTS/RAG MAKING/DOORMAT/DRESS MAKING/COSMETOLOGY / ORNAMENTAL PLANTS AND FLOWER PRODUCTION (PROVISION OF TRAINING AND EQUIPMENTS) 500,000.00 500,000.00 704 LAGONOY - - - 330,000.00 7,070,000.00 - - - - 600,000.00 - - - 6,500,000.00 14,500,000.00 GULAYAN SA PAARALAN PROJECT 330,000.00 330,000.00 SALINTUBIG-PROVISION OF POTABALE WATER SUPPLY - UPGRADING OF LEVEL II WSSS, PROJECT MANAGEMENT AND CAPACITY BUILDING 2,500,000.00 2,500,000.00 VARIOUS PROJECTS 4,570,000.00 4,570,000.00 RESCUE EQUIPMENT - PROCUREMENT OF RESCUE BOAT AND EQUIPMENT - FLOOD CONTROL PROJECT -CONSTRUCTION OF FLOOD CONTROL STRUCTURES - SEAWALL/REVERTMENT/DRAINAGE/CANAL - PROTECTIVE SERVICES - PROVISION OF ECCD LEARNING MATERIALS FOR DCCS 600,000.00 600,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION - CONCRETING OF ROAD 6,500,000.00 6,500,000.00 705 LIBMANAN 12,000,000.00 - - - 17,000,000.00 - - - - 1,000,000.00 - - - - 30,000,000.00 VARIOS PROJECTS 12,000,000.00 12,000,000.00 SMALL IRRIGATION PROJECTS - HANDIONG EXPEDITION WHARVES - FARM IMPLEMENTS - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS MALINAO POTABLE WATER SUPPLY 3,000,000.00 3,000,000.00 MALANSAD NUEVO POTABLE WATER 2,000,000.00 2,000,000.00 CONSTRUCTION OF MALBOGON EVACUATION CENTER 2,000,000.00 2,000,000.00 CUYAPI-UMALO-IBID-LABAO EVACUATION CENTER 2,000,000.00 2,000,000.00 CONSTRUCTION OF POTOT EVACUATION CENTER 2,000,000.00 2,000,000.00 CONSTRUCTION OF TAMPUHAN EVACUATION CENTER 2,000,000.00 2,000,000.00 CONSTRUCTION OF INALAHAN EVACUATION CENTER 2,000,000.00 2,000,000.00 CONSTRUCTION OF MAMBALITE EVACUATION CENTER 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) -MICRO ENTERPRISE DEVELOPMENT 1,000,000.00 1,000,000.00 706 LUPI 3,569,000.00 - - - 4,631,000.00 - - - - - 2,600,000.00 - 700,000.00 1,000,000.00 12,500,000.00 VARIOUS PROJECTS 3,569,000.00 3,569,000.00 NATIONAL COCONUT PRODUCTIVITY ENHANCEMENT PROGRAM,COMPONENT 3-KAANIB ENTERPRISE DEVELOPMENT PROJECT (KASAGANAAN SA NIYUGAN AY KAUNLARAN NG BAYAN) - MUNICIPAL FOOD TERMINAL - BARANGAY FOOD TERMINAL - MARINE PROTECTED AREAS(MANGROVE PLANTING) - ORGANIC AGRICULTURE PROGRAM - PROVISION FOR POTABLE WATER SUPPLY (SALINTUBIG) 4,631,000.00 4,631,000.00 YAMAN PINOY 700,000.00 700,000.00 RURAL MICROENTERPRISE AMONG MICRO, SMALL, AND MEDIUM ENTREPRENEURS 1,400,000.00 1,400,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 1,000,000.00 COMMUNITY BASED PROGRAM (LIVELIHOOD TRAINING) 700,000.00 700,000.00 707 MAGARAO - 1,000,000.00 500,000.00 90,000.00 - - - 500,000.00 1,500,000.00 1,310,000.00 1,000,000.00 - 1,600,000.00 5,000,000.00 12,500,000.00 REHABILITATION/CONCRETING OF 1KM. IRRIGATION SYSTEM FROM SAN MIGUEL TO SANTA ROSA (LUNAY CREEK) 1,000,000.00 1,000,000.00 ESTABLISHMENT OF ROAD SIDE TREE PARK (NATIONAL GREENING PROGRAM) 500,000.00 500,000.00 GULAYAN SA PAARALAN 90,000.00 90,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 DONCILLA ISLAND TOURISM PROJECT 1,500,000.00 1,500,000.00 CONSTRUCTION OF DAY CARE CENTER AND PROVISION OF ECCD LEARNING MATERIALS 1,310,000.00 1,310,000.00 YAMAN PINOY 500,000.00 500,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT 500,000.00 500,000.00 VARIOS ROAD PROJECTS 2,500,000.00 2,500,000.00 REHABILITATION OF MUNICIPAL ROADS - CONCRETING OF ROAD (LATERAL B) FROM SANTA TERESITA LUCIA TO SANTA TERESITA ROSA 2,500,000.00 2,500,000.00 GLOBAL SKILLS ENHANCEMENT TRAINING (GLO-SET) 1,600,000.00 1,600,000.00 708 MILAOR - - - - 4,005,990.00 - - - 2,750,000.00 - - - - 5,744,010.00 12,500,000.00 PROVISION OF MULTI-MEDIA FILTER FOR PUMPING 4,005,990.00 4,005,990.00 CONSTRUCTION OF WHARF FOR RIVER CRUISE TOURISM ACTIVITY 2,750,000.00 2,750,000.00 VARIOUS PROJECTS 5,744,010.00 5,744,010.00 CONCRETING OF CAPUCNASAN TO DALIPAY CORE LOCAL ROAD - 709 MINALABAC 1,220,000.00 - - - 7,968,000.00 - - - - 5,312,000.00 - - - - 14,500,000.00 REHABILITATION,CONSERVATION & PROTECTION OF FISH SANCTUARY AS MPA 620,000.00 620,000.00 ORGANIC FARMING 600,000.00 600,000.00 IMPROVEMENT/UPGRADING WATER RESERVOIR (BANAO SOURCE) & INSTALLATION OF WATER TREATMENT FACILITY 6,500,000.00 6,500,000.00 CONSTRUCTION OF WATER SOURCE IMPROVEMENT/UPGRADING & EXTENSION OF WATER SYSTEM (LEVEL 1 TO LEVEL II) IN BRGYS BAGOLATAO,SAN ANTONIO & SALINGOGON 1,468,000.00 1,468,000.00 VARIOUS KC PROJECTS 5,312,000.00 5,312,000.00 CONSTRUCTION OF DAY CARE CENTER AT THE MUNICIPAL GROUND - CONSTRUCTION OF EVACUATION CENTER - 710 NABUA 7,869,565.20 - - - - - 3,673,913.09 - - - - - 1,239,130.44 4,717,391.27 17,500,000.00 VARIOUS DA PROJECTS 7,869,565.20 7,869,565.20 RICE PRODUCTION PROGRAM WITH ORGANIC RICE PRODUCTION - VEGETABLE PRODUCTION (COMMERCIAL,BACKYARD AND ORGANIC VEGETABLES) WITH PRODUCTION FACILITIES - VERMI COMPOSTING FACILITIES AND STORAGE (42)BARANGAYS) - AGRI ECO TOURISM RICE CORN, GABI VEGETABLE PRODUCTION, FINGERLINGS, BROODSTOCK DISPERSAL PROGRAM - BLOOD DONATION PROGRAM 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT PROGRAM 500,000.00 500,000.00 MNCHN (MATERNAL CHILD HEALTH NUTRITION) 500,000.00 500,000.00 RABIES CONTROL PROGRAM 1,152,173.96 1,152,173.96 STI/HIV AIDS CONTROL PROGRAM 500,000.00 500,000.00 TB CONTROL PROGRAM 521,739.13 521,739.13 ANGUSTIA ROAD CONCRETING LEADING TO HOSPITALS, HIGH SCHOOLS AND MARKET 2,478,260.87 2,478,260.87 ANTIPOLO YOUNG ROAD CONCRETING LEADING TO NORTH RMC HOSPITAL AND LEADING TO SOUTH BATO MARKET 869,565.20 869,565.20 CONCRETING OF BRGY ROAD SAN JOSE, NABUA, CAMARINES SUR LEADING TO SCHOOL, HOSPITAL AND MARKET 869,565.20 869,565.20 ROAD CONCRETING AT SAN ROQUE MANDAWON, NABUA, CAMARINES SUR LEADING TO SCHOOLS, HOSPITALS AND MARKET 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROVISION OF SKILLS TRAINING TO SELECTED POOR PARENTS OF PUBLIC INSTITUTION ON AUTOMOTIVE, ELECTRONICS, DRESSMAKING, TAILORING, FOOD PROCESSING, MACHINE SHOP AND DRIVING (TESDA) 1,239,130.44 1,239,130.44 711 NAGA CITY 3,447,000.00 1,200,000.00 1,560,000.00 2,136,000.00 1,980,000.00 - 1,500,000.00 2,010,000.00 - 5,247,000.00 600,000.00 - - 7,820,000.00 27,500,000.00 RICE PROGRAM-SMALL-SCALE IRRIGATION SYSTEM 600,000.00 600,000.00 IRRIGATION-COMMUNAL IRRIGATION PROJECT 1,200,000.00 1,200,000.00 RICE PROGRAM-FARM MECHANIZATION PROGRAM 537,000.00 537,000.00 CORN PROGRAM-4-ROWS CORN PLANTER 600,000.00 600,000.00 RICE PROGRAM-POST-HARVEST MECHANIZATION PROGRAM 510,000.00 510,000.00 RICE PROGRAM-MPDP/RICE MILL(3PS) 1,200,000.00 1,200,000.00 NATIONAL GREENING PROGRAM CUM CITY OF TRESS DEVELOPMENT 660,000.00 660,000.00 NAGA RIVERBANK REHABILITATION PROJECT 900,000.00 900,000.00 REPAIR OF SCHOOL BUILDING/CLASSROOMS AND PROVISION OF SCHOOL SEATS 1,962,000.00 1,962,000.00 ESTABLISHMENT OF GULAYAN SA PAARALAN 174,000.00 174,000.00 WATERLINE EXTENSION-SALINTUBIG 1,080,000.00 1,080,000.00 CAPACITY-BUILDING FOR CSOS 900,000.00 900,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,500,000.00 1,500,000.00 JOBS FAIRS 510,000.00 510,000.00 DOLE EMERGENCY EMPLOYMENT AND LIVELIHOOD PROGRAM (DEELP) 1,500,000.00 1,500,000.00 REPAIR & UPGARDING OF DCCS 975,000.00 975,000.00 CONSTRUCTION OF DAY CARE CENTER 1,200,000.00 1,200,000.00 PROVISION OF ECC MATERIALS FOR DCCS 672,000.00 672,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO-ENTERPRISE DEVELOPMENT TRACK 2,400,000.00 2,400,000.00 YAMANG PINOY 600,000.00 600,000.00 PROJECTS TO BE IDENTIFIED 200,000.00 200,000.00 CORE LOCAL ROAD CONSTRUCTION 1,500,000.00 1,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,620,000.00 1,620,000.00 CORE LOCAL ROAD CONSTRUCTION AT ZONE 6 SAN ISIDRO 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION AT YABO 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION AT MORADA RAMOS, CAROLINA 1,500,000.00 1,500,000.00 712 OCAMPO 4,300,000.00 - - 500,000.00 4,000,000.00 - 800,000.00 - 500,000.00 2,400,000.00 - - - - 12,500,000.00 VAIOUS PROJECTS 3,100,000.00 3,100,000.00 INSTALLATION OF 4UNITS SHALLOWTUBE WELL (STW) - IRRIGATION DEVELOPMENT SERVICES - SUPPORT TO AGRICULTURE PRODUCTION DEVELOPMENT - MULIT-PURPOSE DRYING PAVEMENT - ORGANIC FERTILIZER PRODUCTION 1,200,000.00 1,200,000.00 REHABILITATION OF 5 CLASSROOM 500,000.00 500,000.00 SALINTUBIG 4,000,000.00 4,000,000.00 CONSTRUCTION OF BRGY. HEALTH STATION EVACUATION CENTER 800,000.00 800,000.00 TOUR PACKAGES DEVELOPMENT 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 2,400,000.00 2,400,000.00 713 PAMPLONA 2,000,000.00 - - 3,350,000.00 1,500,000.00 - 4,200,000.00 - - 1,450,000.00 - - - - 12,500,000.00 CONSTRUCTION OF SMALL IRRIGATION SYSTEM (WATER IMPOUNDING) 1,000,000.00 1,000,000.00 VARIOUS PROJECTS 1,000,000.00 1,000,000.00 GULAYAN SA BARANGAY (ASSORTED VEGETABLE SEEDS) - CONSTRUCTION OF MULTI-PURPOSE PAVEMENT - REHABILITATION/REPAIR OF CLASSROOMS (ELEMENTARY, SECONDARY SCHOOLS AND ALS) 2,500,000.00 2,500,000.00 PROVISION OF ARMCHAIRS 750,000.00 750,000.00 GULAYAN SA BARANGAY 100,000.00 100,000.00 PROVISION OF WATER SUPPLY (LEVEL II) 1,000,000.00 1,000,000.00 REHABILITATION OF DRAINAGE CANAL 500,000.00 500,000.00 ENHANCEMENT OF SKILLS AND KNOWLEDGE OF HEALTH PERSONNEL 1,000,000.00 1,000,000.00 REPAIR OF BARANGAY HEALTH STATIONS 1,000,000.00 1,000,000.00 UPGRADING AND PROCUREMENT OF BRGY HEALTH STATION EQUIPMENTS 1,000,000.00 1,000,000.00 UPGRADING AND PROCUREMENT OF MEDICAL EQUIPMENTS 1,200,000.00 1,200,000.00 VARIOUS PROJECTS 1,450,000.00 1,450,000.00 CONSTRUCTION OF CRISIS INTERVENTION CENTER - 714 PASACAO 500,000.00 500,000.00 600,000.00 810,000.00 6,881,000.00 - 1,709,000.00 1,000,000.00 - 1,500,000.00 - - - - 13,500,000.00 REHABILITATION AND EXTENSION OF IRRIGATION SYSTEM FACILITY 500,000.00 500,000.00 PROVISION OF FISHING GEARS 500,000.00 500,000.00 MANGROVE REFORESTRATION 600,000.00 600,000.00 GULAYAN SA PAARALAN 210,000.00 210,000.00 ABOT-ALAM PROGRAM 600,000.00 600,000.00 VARIOUS DILG PROJECTS 6,881,000.00 6,881,000.00 EXPANSION OF STORM SURGE BARRIER/BREAK WATER - ASPHALTING FROM SITIO PONGOL TO BALOGO PROPER - CONSTRUCTION OF EVACUATION CENTER - PROVISION OF LABORATORY EQUIPMENT (X-RAY, CBC, ETC) 1,000,000.00 1,000,000.00 PURCHASE OF MEDICAL EQUIPMENT TB CONTROL PROGRAM 709,000.00 709,000.00 LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 REPAIR/ENHANCEMENT OF SCHOOL BUILDINGS AND HEALTH CENTER/DCCS 1,000,000.00 1,000,000.00 ENHANCEMENT OF CRISIS INTERVENTION CENTER/STRANDEES CENTER 500,000.00 500,000.00 715 PILI (CAPITAL) - - - 2,100,000.00 2,500,000.00 - 1,400,000.00 - 2,000,000.00 - - - - 9,500,000.00 17,500,000.00 PROVISION OF SCHOOL CHAIRS & FURNITURES 2,100,000.00 2,100,000.00 CONSTRUCTION OF EVACUATION CENTER 2,500,000.00 2,500,000.00 VARIOUS TRAINING PROGRAM FOR HEALTH PERSONNEL 1,400,000.00 1,400,000.00 CONSTRUCTION OF WELCOME ARC 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS ROAD PROJECTS 5,500,000.00 5,500,000.00 CONCRETING OF ACCESS ROAD - CONCRETING OF ACCESS ROAD - CONCRETING OF ACCESS ROAD 4,000,000.00 4,000,000.00 716 PRESENTACION 2,000,000.00 - - 750,000.00 5,600,000.00 - 1,000,000.00 500,000.00 - 1,250,000.00 - - 1,400,000.00 - 12,500,000.00 DISTRIBUTION OF FISHING GEAR & PARAPHERNALIA (INFRA. SUPPORT TO AGRICULTURAL & FISHERY PRODUCTION & DEVT.) 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES: PROVISION OF SCHOOL FURNITURE (SEATS) 750,000.00 750,000.00 VARIOUS DILG PROJECTS 5,600,000.00 5,600,000.00 EVACUATION CENTER - RESCUE EQUIPMENT - FLOOD CONTROL (DRAINAGE CANAL) - HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 750,000.00 750,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING 500,000.00 500,000.00 TECH. VOC. TRAINING/COMMUNITY BASED TRAINING 1,400,000.00 1,400,000.00 717 RAGAY 1,325,000.00 - - 500,000.00 2,515,000.00 - - - - - 700,000.00 - - 10,460,000.00 15,500,000.00 INFRASTRUCTURE SUPPORT TO AGRI AND FISHERY PRODUCTION AND DEVELOPMENT (MOTORIZED FISHING BOAT) 625,000.00 625,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENT 700,000.00 700,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM FOR ALS 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) 2,515,000.00 2,515,000.00 YAMAN PINOY - HANDICRAFTS TRAINING/WORKSHOP 700,000.00 700,000.00 VARIOUS ROAD PROJECTS 10,460,000.00 10,460,000.00 CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION - 718 SAGNAY 1,550,000.00 - - - 4,000,000.00 - 1,050,000.00 - 600,000.00 3,800,000.00 500,000.00 - - 1,000,000.00 12,500,000.00 HIGH VALUE COMMERCIAL DEVELOPMENT PROGRAM: DISTRIBUTION OF ASSORTED VEGETABLE SEEDS & PLANTING MATERIALS & ESTABLISHMENT OF PRODUCTION FACILITIES: GREENHOUSE 550,000.00 550,000.00 TRADING CENTER: MUNICIPAL FOOD TERMINAL 500,000.00 500,000.00 ABACA PROJECTS: ABACA MATERIALS PRODUCTION AND DISTRIBUTION 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY 3,500,000.00 3,500,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 CAPABILITY TRAINING OF PUBLIC HEALTH WORKERS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM: RHU EQUIPMENT: MATERNAL & NEWBORN CARE 550,000.00 550,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS: CAPABILITY BUILDING,PLANNING, PRODUCT DEVELOPMENT MARKETING & STANDARDS 600,000.00 600,000.00 VARIOUS PROTECTIVE SERVICES PROJECTS 3,800,000.00 3,800,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS: CONSTRUCTION OF 7 UNITS DAY CARE CENTERS - INDUSTRY CLUSTERING DEVELOPMENT PROGRAM: CAPABILITY BUILDING, MARKETING & INVESTMENT PROMOTION FOR THE CACAO (TSOKOLATE) PRODUCTION (OTOP) PHASE 1 500,000.00 500,000.00 CONSTRUCTION OF CORE LOCAL ROAD: FOOT BRIDGE 1,000,000.00 1,000,000.00 719 SAN FERNANDO 3,000,000.00 - - - 2,000,000.00 - - - - 600,000.00 - - - 6,900,000.00 12,500,000.00 IRRIGATION PROJECTS AT BRGY. GRIJALVO-BRGY. RIZAL) 1,000,000.00 1,000,000.00 IRRIGATION PROJECTS (IRRIGATION PROJECT AT BRGY. BONIFACIO- BRGY.DEL PILAR) 1,000,000.00 1,000,000.00 MARINE RESERVE AND FISH SANTUARIES (FISH SANTUARY AT BRGY. COTMON & BRGY. GNARAN 1,000,000.00 1,000,000.00 FLOOD CONTROL (CONTRUCTION OF CANAL AT NAPOHONG SALOG) 2,000,000.00 2,000,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING (CAPABILITYBUILDING FOR DAY CARE WORKERS) 600,000.00 600,000.00 VARIOUS ROAD PROJECTS 3,000,000.00 3,000,000.00 CORE LOCAL ROAD CONTRUCTION (ROAD CONSTRUCTION AT BRGY. SANTA TERESITA CRUZ-BRGY. DEL PILAR) - CORE LOCAL ROAD CONTRUCTION (ROAD CONSTRUCTION AT BRGY. BEBERON-BRGY. LUPI 3,000,000.00 3,000,000.00 CORE LOCAL ROAD CONSTRUCTION (ROAD CONSTRUCTION AT BRGY.PAMUKID) 900,000.00 900,000.00 720 SAN JOSE 2,500,000.00 - - 4,000,000.00 4,478,000.00 - 522,000.00 1,000,000.00 - - - - - - 12,500,000.00 COMMUNITY SEED BANGKING(RICE) 500,000.00 500,000.00 VARIOUS FISHERY PRJECTS 2,000,000.00 2,000,000.00 ESTABLISHMENT OF FISH TRADING CENTER - ESTABLISHMENT OF FISH SANCTUARY - REHABILITATION OF CLASSROOM FOR SIX (6) SCHOOLS 3,780,000.00 3,780,000.00 OPERATION OF GULAYAN SA PAARALAN FOR TWENTY TWO(22)ELEMENTARY SCHOOL IN SAN JOSE DISTRICT 220,000.00 220,000.00 CONSTRUCTION OF WATER SUPPLY SYSTEM(PROVISION OF POTABLE WATER SYSTEM) 4,478,000.00 4,478,000.00 CAPABILITY BUILDING FOR HEALTH CARE PROVIDERS FOR MATERNAL,NEONATAL,CHILD HEALTH TEAM (CHT) MOBILIZATION. 522,000.00 522,000.00 LIVELIHOOD SKILLS DEVELOPMENT TRAINING 1,000,000.00 1,000,000.00 721 SIPOCOT 3,660,000.00 - 700,000.00 1,890,800.00 - - 1,575,000.00 - - 8,274,200.00 1,400,000.00 - - - 17,500,000.00 IRRIGATION PROJECTS (SWIP/DD) 2,500,000.00 2,500,000.00 VARIOUS DA PROJECTS 1,160,000.00 1,160,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION & DEVELOPMENT - AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES - POST-HARVEST FACILITIES AND EQUIPMENT - FARM MECHANIZATION (ROTAVATOR) - ESTABLISHMENY OF NURSERY FOR FOREST TREE SPECIES (MAHOGANY AND NARRA) 700,000.00 700,000.00 BASIC EDUCATION FACILITIES 947,800.00 947,800.00 BASIC EDUCATION FACILITIES 623,000.00 623,000.00 GULAYAN SA PAARALAN 70,000.00 70,000.00 GULAYAN SA PAARALAN 250,000.00 250,000.00 HEALTH ENHANCEMENT FACILITIES ENHANCEMENT PROGRAM 1,500,000.00 1,500,000.00 MNCHN (MATERNAL, NEONATAL, CHILD HEALTH & NUTRITION) 75,000.00 75,000.00 PROTECTIVE SERVICES INFRASTRACTURE PROJECTS 2,000,000.00 2,000,000.00 PROTECTIVE SERVICES INFRASTRACTURE PROJECTS 2,774,200.00 2,774,200.00 PROTECTIVE SERVICES INFRASTRACTURE PROJECTS 700,000.00 700,000.00 PROTECTIVE SERVICES CAPABILITY BUILDING 1,050,000.00 1,050,000.00 PROTECTIVE SERVICES CAPABILITY BUILDING 1,750,000.00 1,750,000.00 YAMAN PINOY 1,400,000.00 1,400,000.00 722 SIRUMA 3,200,000.00 - 1,500,000.00 - 2,450,000.00 - 700,000.00 - - - - 2,400,000.00 - 2,250,000.00 12,500,000.00 FISHING GEARS DISTRIBUTION 1,000,000.00 1,000,000.00 INSTALLATION OF AQUA SILVI-CULTURE PROJECT 1,000,000.00 1,000,000.00 ESTABLISHMENT OF CASSAVA PLANTATION 1,200,000.00 1,200,000.00 NATIONAL GREENING PROGRAM (MANGROVE PLANTING) 1,500,000.00 1,500,000.00 CONSTRUCTION OF LINE CANAL DRAINAGE 800,000.00 800,000.00 CONSTRUCTION OF FOOTBRIDGE 1,650,000.00 1,650,000.00 CAPACITY BUILDING ON A) MATERNAL, NEONATAL, CHID HEALTH AND NUTRITION, B) SCHISTOSOMIASIS & MALARIA ELIMINATION C) RABIES ELIMINATION D) LEPROSY E) TB CONTROL, F)STI- HIV & AIDS PREVENTION G)DENGUE ELIMINATION, H)HEALTH AND EMERGENCY MANAGEMENT 700,000.00 700,000.00 VARIOUS ROAD PROJECTS 2,250,000.00 2,250,000.00 CORE LOCAL ROAD - CORE LOCAL ROAD - CORE LOCAL ROAD - CORE LOCAL ROAD - BARANGAY LINE ENHANCEMENT PROGRAM 2,400,000.00 2,400,000.00 723 TIGAON - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS ROAD PROJECTS 12,500,000.00 12,500,000.00 CONCRETING OF CORE LOCAL ROAD - CONCRETING OF CORE LOCAL ROAD - CONCRETING OF CORE LOCAL ROAD - CONCRETING OF CORE LOCAL ROAD - 724 TINAMBAC 1,000,000.00 - - - 8,400,000.00 - - - - - 1,600,000.00 - - 10,500,000.00 21,500,000.00 DISTRIBUTION OF FISHING GEAR/PARAPHERNALIA 1,000,000.00 1,000,000.00 CONSTRUCTION/INSTALLATION OF LEVEL III WATER SYSTEM 1,500,000.00 1,500,000.00 CONSTRUCTION/INSTALLATION OF LEVEL III WATER SYSTEM 1,500,000.00 1,500,000.00 CONSTRUCTION OF FLOOD CONTROL/SEAWALL 2,400,000.00 2,400,000.00 CONSTRUCTION OF FLOOD CONTROL/SEAWALL 3,000,000.00 3,000,000.00 YAMAN PINOY 1,600,000.00 1,600,000.00 VARIOUS ROAD PROJECTS 6,500,000.00 6,500,000.00 CONSTRUCTION OF ACCESS ROAD - CONSTRUCTION OF ACCESS ROAD - CONSTRUCTION OF ACCESS ROAD - CONSTRUCTION OF ACCESS ROAD - CONSTRUCTION OF ACCESS ROAD - CONSTRUCTION OF ACCESS ROAD - CONSTRUCTION OF ACCESS ROAD - CONSTRUCTION OF ACCESS ROAD 1,000,000.00 1,000,000.00 CONSTRUCTION OF ACCESS ROAD 1,500,000.00 1,500,000.00 CONSTRUCTION OF ACCESS ROAD 1,500,000.00 1,500,000.00 CATANDUANES 26,467,000.00 1,000,000.00 1,000,000.00 22,580,000.00 43,970,000.00 - 11,914,000.00 1,418,000.00 3,335,000.00 18,300,000.00 2,140,000.00 - 3,276,000.00 1,600,000.00 137,000,000.00 725 BAGAMANOC 4,690,000.00 - - - 6,170,000.00 - 864,000.00 - - - - - 776,000.00 - 12,500,000.00 VARIOUS IRRIGATION PROJECTS 2,690,000.00 2,690,000.00 IRRIGATION PROJECT - IRRIGATION PROJECT - IRRIGATION PROJECT - FISHERY PRODUCTION & DEVELOPMENT 900,000.00 900,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE 1,100,000.00 1,100,000.00 SALIN-TUBIG PROJECT 1,050,000.00 1,050,000.00 SALIN-TUBIG PROJECT 1,050,000.00 1,050,000.00 SALIN-TUBIG PROJECT 610,000.00 610,000.00 SALIN-TUBIG PROJECT 610,000.00 610,000.00 SALIN-TUBIG PROJECT 1,350,000.00 1,350,000.00 EVACUATION FACILITY 1,000,000.00 1,000,000.00 DRAINAGE CANAL PROJECT 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (CONST. OF HEALTH STATION) 864,000.00 864,000.00 TECHNICAL VOCATIONAL TRAINING 776,000.00 776,000.00 726 BARAS 2,300,000.00 - 500,000.00 500,000.00 6,100,000.00 - 1,500,000.00 - - 1,600,000.00 - - - - 12,500,000.00 CONSTRUCTION OF COLD STORAGE 1,500,000.00 1,500,000.00 ESTABLISHMENT OF SANTUARY AND SHALLOWPAYAO (BOYA FOR FISHERFOLK) 800,000.00 800,000.00 REFORESTATION (MANGROVE/NIPA/CARAGUMOY) 500,000.00 500,000.00 REHAB OF SCHOOL BUILDING (ROOFING) 500,000.00 500,000.00 PROVISION OF PORTABLE WATER 500,000.00 500,000.00 PROVISION OF PORTABLE WATER 600,000.00 600,000.00 PROVISION OF PORTABLE WATER 500,000.00 500,000.00 PROVISION OF PORTABLE WATER 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROVISION OF PORTABLE WATER 500,000.00 500,000.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 PROCUREMENT OF RESCUE EQUIPMENT (SPEED BOAT) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE - CONSTRUCTION OF SEAWALL - CONSTRUCTION OF SEAWALL - CONSTRUCTION OF SEAWALL - EXPANSION OF HEALTH FACILITIES 1,500,000.00 1,500,000.00 CONSTRUCTION OF DAY CARE CENTER 1,000,000.00 1,000,000.00 REHAB/REPAIR OF DAY CARE CENTER 600,000.00 600,000.00 727 BATO 1,760,000.00 - - 1,100,000.00 3,700,000.00 - - 500,000.00 500,000.00 1,300,000.00 1,640,000.00 - 1,500,000.00 500,000.00 12,500,000.00 VARIOUS FISHERY PRJECTS 750,000.00 750,000.00 ESTABLISHMENTS OF FISH AGGREGATING DEVICE - VARIOUS DA PROJECTS 1,010,000.00 1,010,000.00 PROVISION OF FARM EQUIPMENT (THRESHER) - HIGH VALUE COMMERCIAL CROPS PRODUCTION (COCONUT INTER-CROPPING WITH CACAO, COFFEE) - FISH SANCTUARY AND MARINE RESERVE - GULAYAN SA PAARALAN 250,000.00 250,000.00 LITERACY CLASSES FOR ALS 850,000.00 850,000.00 SALIN-TUBIG 900,000.00 900,000.00 VARIOUS DILG PROJECTS 2,300,000.00 2,300,000.00 EVACUATION FACILITY/CENTER - CONSTRUCTIONS OF CANALS/DRAINAGE (FLOOD CONTROL PROGRAM) - CSO STRENGTHENING (CAPACITY BUILDING FOR CSO) 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT POGRAM 500,000.00 500,000.00 UPGRADING OF DAY CARE CENTERS 800,000.00 800,000.00 PROVISION OF ECCD LEARNING MATERIALS AND PLAYGROUND DEVICE TO DAY CARE CENTERS 500,000.00 500,000.00 CONSTRUCTION OF TRAINING CUM PRODUCTION CENTER 1,640,000.00 1,640,000.00 ROAD CONCRETING 500,000.00 500,000.00 TRAINING ON FISH AND MEAT PROCESSING 500,000.00 500,000.00 METALCRAFT FABRICATION TRAINING 500,000.00 500,000.00 TRAINING ON COMMERCIAL COOKING 500,000.00 500,000.00 728 CARAMORAN 1,687,000.00 - - 1,713,000.00 4,500,000.00 - - - - 4,600,000.00 - - - - 12,500,000.00 PROVISION OF FISHING EQUIPMENT 687,000.00 687,000.00 HIGH VALUE CROP DEVELOPMENT 500,000.00 500,000.00 ESTABLISHMENT OF FOOD TERMINAL 500,000.00 500,000.00 REPAIR OF SCHOOL CLASSROOMS 1,213,000.00 1,213,000.00 REPRODUCTION OF ALS MODULES 500,000.00 500,000.00 VARIOUS WATER PROJECTS 4,000,000.00 4,000,000.00 SALINTUBIG - CSO STRENGTHENING 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROJECT - (SLP) -MICRO ENTERPRISE DEVELOPMENT 1,000,000.00 1,000,000.00 CONST. OF DAY CARE CENTER 1,600,000.00 1,600,000.00 REPAIR OF DAY CARE CENTER 2,000,000.00 2,000,000.00 729 GIGMOTO 1,000,000.00 - - 1,000,000.00 8,000,000.00 - - - - 2,500,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF 1.2 MX3M SWIP & 70 L.M. REINFORCED CONCRETE IRRIGATION CANAL - ABACA DISEASE ERADICATION AND ABACA REHABILITATION - PROVISION OF ONE (1) UNIT MECHANICAL FLATBED DRYER - SCHOOL BUILDING REPAIR 1,000,000.00 1,000,000.00 IMPROVEMENT OF WATER SYSTEM 6,500,000.00 6,500,000.00 CONSTRUCTION OF SAN PEDRO RIVER CONTROL 1,000,000.00 1,000,000.00 CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) -MICRO ENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 730 PANDAN 1,748,000.00 - - 2,067,000.00 - - 3,550,000.00 - 2,035,000.00 2,000,000.00 500,000.00 - - 600,000.00 12,500,000.00 VARIOUS DA PROJECTS 998,000.00 998,000.00 IRRIGATION DEVELOPMENT SERVICES (PISOS) - FARM MECHANIZATION - VARIOUS FISHERY PRJECTS 750,000.00 750,000.00 HAPA BASED TILAPIA HATCHERY - FISH CAGE CULTURE - DISTRIBUTION OF FISHING GEAR/PARAPHERNALIA - POST HARVEST FACILITY (FLAT BED DRYER) - REPAIR OF CLASSROOM 1,500,000.00 1,500,000.00 ESTABLISHMENT OF GULAYAN SA PAARALAN 567,000.00 567,000.00 CAPABILITY BUILDING FOR THE PREVENTION AND CONTROL OF INFECTIOUS AND NON-COMMUNICABLE DISEASES 500,000.00 500,000.00 CONSTRUCTION OF NUTRI-HUT 600,000.00 600,000.00 MATERNAL AND CHILD HEALTH AND NUTRITION (MNCHN) THROUGH ACQUISITION OF ESSENTIAL DRUGS AND MEDICINES, MEDICAL AND LABORATORY SUPPLIES 1,800,000.00 1,800,000.00 TRAINING ON MOBILIZING COMMUNITY SUPPORT FOR INFANT AND YOUNG CHILD FEEDING (IYCF) PROGRAM 650,000.00 650,000.00 CONSTRUCTION OF ROOMS AT PANDAN SEASHORE PARK 2,035,000.00 2,035,000.00 CONSTRUCTION OF DAY CARE CENTER 800,000.00 800,000.00 UPGRADING OF DAY CARE CENTER 700,000.00 700,000.00 TRAINING OF DCW'S ON FIRST AID AND ERPAT & PROVISION OF ECCD LEARNING MATERIALS AND HYGIENE KIT FOR DCC 500,000.00 500,000.00 CARAGUMOY DRYER 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 600,000.00 600,000.00 731 PANGANIBAN - - - 11,000,000.00 1,000,000.00 - - - - - - - - 500,000.00 12,500,000.00 PROVISION OF EDUCATIONAL FACILITIES A. PANAY ELEMENTARY SCHOOL (2 BLDGS. WITH 3 CLASSROOMS EACH) 1,643,484.50 1,643,484.50 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROVISION OF EDUCATIONAL FACILITIES C. ALINAWAN ELEMENTARY SCHOOL A. 3 CLASSROOMS B. OLD MULTI-PURPOSE BLDG. (1 KINDER CLASSROOM, OFFICE, & H>E. ROOM) 764,261.16 764,261.16 PROVISION OF EDUCATIONAL FACILITIES F. PANGANIBAN CENTRAL ELEMENTARY SCHOOL A. 14 CLASSROOMS B. REHABILITATION OF 3 CLASSROOM; C. REHABILITATION OF GARDEN HOUSE 2,091,905.40 2,091,905.40 PROVISION OF EDUCATIONAL FACILITIES G. CABUYOAN ELEMENTARY SCHOOL 1,936,348.94 1,936,348.94 PROVISION OF EDUCATIONAL FACILITIES K. PANGANIBAN NATIONAL HIGH SCHOOL PCES COMPOUND A. 6 CLASSROOMS B. PROVISION OF HAND WASHING AREA (5M X 6M) C. REHABILITATION OF 3 CLASSROOMS D. REHABILITATION OF 6M X 6M OFFICE 2,000,000.00 2,000,000.00 PROVISION OF EDUCATIONAL FACILITIES N. BURABOD COMMUNITY SCHOOL 1,024,000.00 1,024,000.00 IMPLEMENTATION OF ALTERNATIVE LEARNING SYSTEM 1,540,000.00 1,540,000.00 VARIOUS WATER PROJECTS 1,000,000.00 1,000,000.00 PROVISION OF POTABLE WATER SYSTEM CONSTRUCTION OF SPRING LEVEL-1 - PROVISION OF POTABLE WATER SYSTEM CONSTRUCTION OF SPRING LEVEL-1 - VARIOUS ROAD PROJECTS 500,000.00 500,000.00 CONSTRUCTION OF INTERMEDIATE ROAD - 732 SAN ANDRES 7,482,000.00 - - 700,000.00 500,000.00 - - 918,000.00 - 2,900,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 4,612,000.00 4,612,000.00 CONST.OF SMALL WATER IMPOUDING PROJECTS (SWIP) - PROVISIONOF FARM MACHINERIES & EQUIPMENTS - HIGH VALUE CROP DEVT. PROGRAM - DIST. OF SHALLOWWATER & DEEP SEA PAYAOS 1,290,000.00 1,290,000.00 MOTORIZED BOAT AND FISHING NET FOR INDIGENT FISHERMEN 1,080,000.00 1,080,000.00 PROVISIONOF PH FACILITIES/EQUIPMENT:NET/LAMINATED SACKS 500,000.00 500,000.00 LITERACY CLASSES FOR OSY'S AND ADULTS 700,000.00 700,000.00 ORGANIZING AND STRENGTHENING OF CSO 500,000.00 500,000.00 LIVELIHOOD TRAININGS & SEMINARS FOR OSY & ADULTS 918,000.00 918,000.00 CONSTRUCTION OF CRISIS CENTER 1,900,000.00 1,900,000.00 UPGRADING OF DCC 500,000.00 500,000.00 DISTRIBUTE ECCD LEARNING MATERIALS 500,000.00 500,000.00 733 SAN MIGUEL 1,500,000.00 - - 2,000,000.00 6,900,000.00 - - - - 2,100,000.00 - - - - 12,500,000.00 CONSTRUCTION OF SMALL FARM RESERVOIR 500,000.00 500,000.00 FARM MECHANIZATION PROJECT 500,000.00 500,000.00 DEVELOPMENT OF HAPA BASE AND TILAPIA HATCHERY 500,000.00 500,000.00 PROVISION OF BASIC EDUCATIONAL FACILITIES 2,000,000.00 2,000,000.00 VARIOUS WATER PROJECTS 4,900,000.00 4,900,000.00 SALINTUBIG PROJECT - CONSTRUCTION OF MUNICIPAL EVACUATION CENTER (PHASE III) 2,000,000.00 2,000,000.00 CONSTRUCTION OF DAY CARE CENTER 1,600,000.00 1,600,000.00 PROVISION OF ECCD LEARNING MATERIALS 500,000.00 500,000.00 734 VIGA 1,000,000.00 1,000,000.00 - 900,000.00 2,100,000.00 - 6,000,000.00 - - - - - 1,000,000.00 - 12,000,000.00 VARIOUS PROJECTS 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM (POULTRY AND SWINE) - PURCHASE OF COCONUT COOKING OIL PROCESSING EQUIPMENT - PURCHASE OF CASSAVA PROCESSING EQUIPMENT - VARIOUS IRRIGATION PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION/REHAB OF IRRIGATION SYSTEM - PROVISION OF 1000 PCS SCHOOL CHAIRS 700,000.00 700,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 SALINTUBIG PROJECT REPAIR/REHAB OF WATER SYSTEM 1,100,000.00 1,100,000.00 VARIOUS PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF RIVER CONTROL - CONSTRUCTION OF SEA WALL - CONSTRUCTION OF BHS 2,000,000.00 2,000,000.00 PROVISION OF 2000 UNITS SANITARY TOILETS 1,500,000.00 1,500,000.00 REHAB OF RHU BLDG. TO OPD COMPLEX 1,500,000.00 1,500,000.00 REHAB/REPAIR OF BRGY HEALTH STATIONS 1,000,000.00 1,000,000.00 SKILLS TRAINING (TESDA) 1,000,000.00 1,000,000.00 735 VIRAC 3,300,000.00 - 500,000.00 1,600,000.00 5,000,000.00 - - - 800,000.00 1,300,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 2,300,000.00 2,300,000.00 INSTALLATION OF WINDPUMP - INFRASTRUCTURE SUPPORT FACILITIES - PROCUREMENT AND DISTRIBUTION OF 10 HAND TRACTORS - INFRASTRUCTURE SUPPORT FACILITIES - DISTRIBUTION OF 8 MOTORIZED FISHING BOATS - MUNICIPAL FOOD TERMINAL PROJECT - POST HARVEST FACILITY - CONSTRUCTION OF 4 MULTI PURPOSE DRYING PAVEMENT - LIVELIHOOD PROJECTS - TILAPIA CULTURE & SQUID PRODUCTION 500,000.00 500,000.00 FISH SANCTUARY AND MARINE RESERVE AREA DEVELOPMENT 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 FABRICATION OF SCHOOL CHAIRS 500,000.00 500,000.00 REPAIR OF SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 SALINTUBIG PROJECT - CONSTRUCTION OF LEVEL I WS W/ WATSAN 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 REPAIR OF GOGON RIVER CONTROL (REVETMENT) 2,000,000.00 2,000,000.00 CSOS CAPABILITY BUILDING PROGRAM 500,000.00 500,000.00 TOURISM DEVELOPMENT 800,000.00 800,000.00 UPGRADING OF DAY CARE CENTER 800,000.00 800,000.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS MASBATE 51,277,620.67 1,100,000.00 3,500,000.00 19,721,922.00 119,361,073.00 2,100,000.00 23,894,872.00 4,140,916.00 11,261,254.33 36,248,495.00 2,997,666.00 2,000,000.00 4,100,515.00 9,287,666.00 290,992,000.00 736 AROROY 8,271,995.00 - - 2,710,952.00 - - 4,111,311.00 1,570,916.00 - 2,692,995.00 897,666.00 - 1,346,499.00 897,666.00 22,500,000.00 VARIOUS DA PROJECTS 7,194,795.00 7,194,795.00 ARC CONNECTIVITY & ECONOMIC SUPPORT SERVICES (ARCCESS)- SUPPORT FOR FARM MACHINERIES AND EQUIPMENT (TRACTOR) - IRRIGATION FACILITIES-WATERPUMPS & ACCESSORIES - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - RICE SEEDER - THRESHERS - AGRO PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES - ESTABLISHMENT OF MUSHROOM CULTURE PRODUCTION CENTER - POST HARVEST FACILITIES (CONST. OF MULTI-PURPOSE DRYING PAVEMENT) - TRADING POST-BRGY FOOD TERMINAL - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - MEAT PROCESSING - FISH PROCESSING 538,600.00 538,600.00 QUAIL PRODUCTION - FREE RANGE CHICKEN - MARINE RESERVE & FISH SANCTUARIES-ESTABLISHMENT OF MARINE RESERVE 538,600.00 538,600.00 BASIC EDUCATION FACILITIES- PROVISION OF SCHOOL FURNITURE 2,172,352.00 2,172,352.00 GULAYAN SA PAARALAN-PROVISION OF GARDEN TOOLS 538,600.00 538,600.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-CONSTRUCTION OF BIRTHING FACILITIES WITH AMENITIES 2,266,607.00 2,266,607.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 970,467.00 970,467.00 REPAIR OF BIRTHING FACILITY WITH AMENITIES 874,237.00 874,237.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) - MICRO- ENTERPRISE DEVELOPMENT FOR DISADVANTAGE WOMEN 673,250.00 673,250.00 DOLE INTEGRATED LIVELIHOOD PROGRAM (DLIP): TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGE WORKERS (TUPAD) 897,666.00 897,666.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICRO ENTERPRISE DEVELOPMENT TRACK-PROGRAM FOR 4PS BENEFICIARIES & FAMILIES BELOWPOVERTY THRESHOLD 2,692,995.00 2,692,995.00 YAMAN PINOY-SKILLS TRAINING CUM LIVELIHOOD ON JEWELRY MAKING PROJECT PACKAGE 897,666.00 897,666.00 PROJECT TO BE IDENTIFIED 897,666.00 897,666.00 TECHNICAL VOCATIONAL TRAINING/COMMUNITY BASED TRAINING 1,346,499.00 1,346,499.00 737 BALENO - - - 500,000.00 10,700,000.00 - 1,300,000.00 - - - - - - - 12,500,000.00 REPAIR AND IMPROVEMENT 500,000.00 500,000.00 VARIOUS DILG PROJECTS 10,700,000.00 10,700,000.00 FLOOD CONTROL - EVACUATION CENTER - BIRTHING FACILITY 1,300,000.00 1,300,000.00 738 BALUD 1,500,000.00 - 500,000.00 2,630,000.00 4,770,000.00 - 1,500,000.00 - - 1,600,000.00 - - - - 12,500,000.00 REHABILITATION OF MARINE RESERVE AND FISH SANCTUARY 500,000.00 500,000.00 ORGANIC AGRICULTURE PROGRAM 1,000,000.00 1,000,000.00 WATER SHADE WITHIN MUNICIPAL WATER SYSTEM SOURCE 500,000.00 500,000.00 REHABILITATION OF 6-CLASSROOMS 1,800,000.00 1,800,000.00 PROVISION OF CHAIRS 500,000.00 500,000.00 GULAYAN SA PAARALAN 330,000.00 330,000.00 VARIOUS DILG PROJECTS 4,770,000.00 4,770,000.00 CONSTRUCTION OF SALIPSIP FOOTBRIDGE - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF MUNICIPAL DRAINAGE SYSTEM - CONSTRUCTION OF SEAWALL - HEALTH FACILITY RNHANCEMENT IN MAIN HEALTH CENTER 1,500,000.00 1,500,000.00 CONSTRUCTION OF DAY CARE CENTER 1,600,000.00 1,600,000.00 739 BATUAN - - - - 7,650,000.00 - - - 600,000.00 4,250,000.00 - - - - 12,500,000.00 VARIOUS DILG PROJECTS 7,650,000.00 7,650,000.00 CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF SEA WALL - LOCAL TOURISM DEVELOPMENT 600,000.00 600,000.00 CONSTRUCTION OF DAY CARE CENTER 4,250,000.00 4,250,000.00 740 CATAINGAN 1,000,000.00 - 2,000,000.00 - 4,000,000.00 - 500,000.00 - - 4,000,000.00 1,000,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,000,000.00 1,000,000.00 4-WHEEL DRIVE TRACTOR WITH DISC PLOW, DISC, HARROW, ETC. - ESTABLISHMENT OF 100 HECTARES MARINE SANCTUARY - UPLAND REFORESTATION PROJECT/GREENING PROGRAM 2,000,000.00 2,000,000.00 CONSTRUCTION OF WATER SYSTEM (LEVEL II) 4,000,000.00 4,000,000.00 CONSTRUCTION OF SANITARY TOILETS 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER FOR THE ELDERLY 1,000,000.00 1,000,000.00 CONSTRUCTION OF STANDARD EVACUATION CENTER 3,000,000.00 3,000,000.00 CONSTRUCTION OF STANDARD OTOP STORE 1,000,000.00 1,000,000.00 741 CAWAYAN - - - 1,430,000.00 7,500,000.00 - 2,000,000.00 1,570,000.00 - 7,000,000.00 - - - - 19,500,000.00 BASIC EDUCATION FACILITIES: REPAIR/ REHABILITATION OF CLASSROOMS AND PROVISION OF SCHOOL FURNITURE 940,000.00 940,000.00 GULAYAN SA PAARALAN 490,000.00 490,000.00 VARIOUS WATER PROJECTS 7,500,000.00 7,500,000.00 SALINTUBIG-PROVISION OF POTABLE WATER SUPPLY (ESTABLISHMENT OF LEVEL II WATER SUPPLY SYSTEM INCLUDING APPROPRIATE WATER TREATMENT SYSTEMS) - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS GEOGRAPHICALLY ISOLATED AND DISADVANTAGE AREAS (PROVISION OF SANITARY TOILETS) 2,000,000.00 2,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM (DLIP) WORKERS INCOME AUGMENTATION PROGRAM (WIN-AP) 1,570,000.00 1,570,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT (CONSTRCUTION OF EVACUATION CENTER) 7,000,000.00 7,000,000.00 742 CITY OF MASBATE (CAPITAL) 8,580,000.00 - 500,000.00 500,000.00 4,120,000.00 - 1,800,000.00 - - - - - - - 15,500,000.00 VARIOUS DA PROJECTS 8,580,000.00 8,580,000.00 CONSTRUCTION OF SMALL WATER RESERVOIR - PROVISION OF POST HARVEST FACILITIES (THRESHER & CORN MILLS, MULTI-PURPOSE DRYING PAVEMENT) - VEGETABLE PRODUCTION - BACKYARD LIVESTOCK RAISING - COMMUNAL LIVESTOCK DISTRIBUTION PROGRAM ("BAKA MO, ASENSO KO") - REFORESTATION OF MANGROVE AND WATERSHED FORESTS 500,000.00 500,000.00 STREET EDUCATION PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTERS 4,120,000.00 4,120,000.00 CONSTRUCTION OF BIRTHING FACILITY 1,000,000.00 1,000,000.00 REHABILITATION OF 6 BARANGAY HEALTHP STATIONS TO BIRTHING FACILITY STANDARD 800,000.00 800,000.00 743 CLAVERIA - - - 2,439,200.00 2,756,612.00 - 4,604,192.00 - - - - - 1,191,996.00 - 10,992,000.00 REPAIR OF ELEMENTARY SCHOOL BUILDING 2,439,200.00 2,439,200.00 CONSTRUCTION OF EVACUATION FACILITY AND RESCUE EQUIPMENT 1,865,946.00 1,865,946.00 CONSTRUCTION OF SEAWALL 890,666.00 890,666.00 CONSTRUCTION OF BARANGAY HEALTH STATION 4,104,192.00 4,104,192.00 CONSTRUCTION OF SANITARY TOILET 500,000.00 500,000.00 TECHNICAL VOCATIONAL TRAINING/ COMMUNITY TRAINING 1,191,996.00 1,191,996.00 744 DIMASALANG 11,400,000.00 - - - - - - - - - - - - 1,100,000.00 12,500,000.00 ONE UNIT FOUR WHEEL DRIVE TRACTOR WITH ACCESSORIES, 1 UNIT PLANTER WITH ACESSORIES, 1 UNIT THRESHER WITH ACCESSORIES, ONE UNIT CARABOY TRACTOR 3,000,000.00 3,000,000.00 MANGROVE REFORESTATION AND REHABILITATION OF ABANDONED FISHPONDSIN DIMASALANG, MASBATE 1,500,000.00 1,500,000.00 ESTABLISHMENT OF MARINE PROTECTED AREA IN CADULAN & MAGCARAGUIT, DAMASALANG MASBATE 2,400,000.00 2,400,000.00 CONSTRUCTION OF BRGY, FOOD TERMINAL (BFT) 1,000,000.00 1,000,000.00 ESTABLISHMENT OF ORGANIC AGRICULTURE AND ESTABLISHMENT OF VERMI COMPOSTING FACILITY 1,500,000.00 1,500,000.00 AQUA CILVIC CULTURE PROJECT 1,000,000.00 1,000,000.00 CONSTRUCTION OF SMALL WATER IMPOUNDING PROJECT (SWIP) IN BARANGAY CADULAN AND MAMBOG 1,000,000.00 1,000,000.00 PROJECTS TO BE IDENTIFIED 1,100,000.00 1,100,000.00 745 ESPERANZA 4,065,000.00 - - - 4,010,000.00 - - - 2,635,000.00 - - - - 1,790,000.00 12,500,000.00 VARIOUS FISHERY PRJECTS 2,015,000.00 2,015,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD/AGRI-FISHERY BUSINESS INVESTMENTS & CARPENTRY SKILLS/CAPABILITY DEVELOPMENT/EQUIPMENTS & ORGANIZATIONAL MANAGEMENT TRAININGS - ESTABLISHMENT OF MARINE RESERVE/MARINE SANCTUARY & ENFORCEMENT/FLET COMPONENTS - DEVELOPMENT OF POTENTIAL RICE LANDS INTO IRRIGABLE RICE FIELDS THRU INCENTIVE PROGRAMS & PROVISION OF FARM EQUIPMENTS/TOOLS/FACILITIES (FARM WATER TOWERS) 2,050,000.00 2,050,000.00 INSTALLATION & CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 3,570,000.00 3,570,000.00 IMPROVEMENT OF LEVEL II WATER SUPPLY SYSTEM 440,000.00 440,000.00 ESTABLISHMENT OF ESPERANZA-AGOHO WATERSPORTS COMPLEX (PHASE III) 2,635,000.00 2,635,000.00 ASPHALTING OVERLAY OF DETERIORATED EXISTING PAVE ROADS 1,790,000.00 1,790,000.00 746 MANDAON 2,740,625.67 - - 841,770.00 923,830.00 - 2,000,000.00 - 3,026,254.33 1,905,500.00 500,000.00 - 562,020.00 - 12,500,000.00 PROVISION OF SMALL MOTORIZED BOAT WITH FISHING PARAPHERNALIA 716,400.00 716,400.00 VARIOUS FISHERY PRJECTS 609,196.28 609,196.28 NEWBANTAY DAGAT PATROL BOAT - FISH CAGES - LIVELIHOOD FUNDING ASSISTANCE FOR PARADAHAN SMALL COCONUT FARMERS AGRICULTURAL MULTI-PURPOSE COOPERATIVE (PSCFAMPC) IN BARANGAY MAOLINGON FOR VINEGAR, BUKO JUICE, COCO MILK FOOD PROCESSING PRESERVATION 500,000.00 500,000.00 CATTLE FEEDLOT FATTENING AND PROCESSING 915,029.39 915,029.39 MAJOR REPAIR OF SCHOOL BUILDING WITH THREE (3) CLASSROOMS. 716,400.00 716,400.00 GULAYAN SA PAARALAN 8,955.00 8,955.00 GULAYAN SA PAARALAN 116,415.00 116,415.00 VARIOUS DILG PROJECTS 923,830.00 923,830.00 PUMP DEEP WELL - CONSTRUCTION OF FOOTBRIDGE - UPGRADING OF HEALTH FACILITY (BHS) THROUGH THE HEALTH FACILITY ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 CONSTRUCTION OF TOURISM VISITOR'S CENTER 2,112,844.33 2,112,844.33 LOCAL TOURISM DEVELOPMENT PROJECTS 913,410.00 913,410.00 CONSTRUCTION OF DCC OF SITIO CAN-INITON, POBLACION 500,000.00 500,000.00 CONSTRUCTION OF GROUP HAND WASHING FACILITY IN DCC WITH COMPLETE SET OS SOAP, FLOURIDE GEL AND TOOTHPASTE. 510,000.00 510,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER (WITH DESIGNATED ROOMS FOR EACH CASES OF WOMEN AND GIRL-CHILD ABUSE) 895,500.00 895,500.00 FOOD PROCESSING / DRESSMAKING 500,000.00 500,000.00 COMMUNITY BASED TRAINING ON MASSAGE THERAPY & BEAUTY CARE 562,020.00 562,020.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 747 MILAGROS 3,400,000.00 - - 1,500,000.00 1,600,000.00 - - 1,000,000.00 5,000,000.00 - - 2,000,000.00 - - 14,500,000.00 PROVISION OF PUMP IRRIGATION FOR OPEN SOURCE 800,000.00 800,000.00 FARM MECHANIZATION 630,000.00 630,000.00 MULTI-PURPOSE DRYING PAVEMENT 500,000.00 500,000.00 NATIONAL FISHERY PROGRAM 970,000.00 970,000.00 BIO-FERTILIZER PRODUCTION 500,000.00 500,000.00 REHAB. SCHOOL BUILDING 1,500,000.00 1,500,000.00 VARIOUS WATER PROJECTS 1,100,000.00 1,100,000.00 ESTAB.OF LEVEL I WATER SYSTEM - ESTAB. LEVEL II WATER SYSTEM - REPAIR OF WATER SYSTEM - ESTAB. OF LEVEL III - CONST. OF BRIDGE 500,000.00 500,000.00 CONST. OF POBLACION DRAINAGE SYSTEM - LIVELIHOOD PROGRAM 500,000.00 500,000.00 LIVELIHOOD PROGRAM 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT & PROMOTION 5,000,000.00 5,000,000.00 BARANGAY LINE ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 748 MOBO 3,500,000.00 600,000.00 - 2,000,000.00 3,500,000.00 - - - - 2,900,000.00 - - - - 12,500,000.00 CONSTRUCTION OF IRRIGATION FACILITY 600,000.00 600,000.00 CONSTRUCTION OF COLD STORAGE 1,000,000.00 1,000,000.00 FISH SANCTUARY DEVELOPMENT 1,500,000.00 1,500,000.00 LIVELIHOOD PROGRAM FOR OUT OF SCHOOL YOUTH THRU POULTRY & EGG PRODUCTION 1,000,000.00 1,000,000.00 SCHOOL FURNITURE AND EQUIPMENT 500,000.00 500,000.00 GULAYAN SA PAARALAN 320,000.00 320,000.00 INSTRUCTIONAL MATERIALS FOR CHILDREN WITH SPECIAL NEEDS (PWD) 500,000.00 500,000.00 INSTRUCTIONAL DEVICES FOR ABOT ALAM PROGRAM ALS IN AND OUT OF SCHOOL YOUTH 680,000.00 680,000.00 PROVISION OF POTABLE WATER SUPPLY (CONSTRUCTION OF LEVEL II, 2 BRGYS.) 2,851,500.00 2,851,500.00 VARIOUS PROJECTS 648,500.00 648,500.00 COMPLETION OF REYES SOCIAL HALL CUM EVACUATION CENTER - CONSTRUCTION OF DRAINAGE CANAL ALONG REAL STREET TO BANADERO RIVER - SUSTAINABLE LIVELIHOOD PROGRAM (SLP) -MICRO ENTERPRISE DEVELOPMENT 2,900,000.00 2,900,000.00 749 MONREAL 1,000,000.00 - - - 6,000,000.00 - 2,000,000.00 - - 1,000,000.00 - - - 2,500,000.00 12,500,000.00 PURCHASE OF POST-HARVEST EQUIPMENT (MECHANICAL DRYER) 1,000,000.00 1,000,000.00 COMPLETION OF EXISTING LEVEL III WATER SYSTEM (PHASE 3) 3,000,000.00 3,000,000.00 CONSTRUCTION OF RESILIENT SEA WALLS 3,000,000.00 3,000,000.00 CONSTRUCTION OF BIRTHING FACILITY 2,000,000.00 2,000,000.00 CONSTRUCTION OF DAY CARE CENTER (DCC) 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 2,500,000.00 2,500,000.00 CONCRETING OF LUWACAN - CAPATAGAN ROAD - CONCRETING OF REAL-MATANG TUBIG ROAD AND CONSTRUCTION OF LINE CANAL - CONCRETING OF MATANG TUBIG - LUWACAN ROAD AND CONSTRUCTION OF LINE CANAL - 750 PALANAS 1,120,000.00 - - 2,700,000.00 4,700,000.00 600,000.00 1,680,000.00 - - 1,700,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 490,000.00 490,000.00 ACQUISITION OF FARM MECHANIZATION FACILITIES/EQUIPMENT TO IMPROVE FARMING PRODUCTIVITY AND PALAY SHED TO IMPROVEE STORAGE - PH MECHANIZATION PROGRAM - FLATBED DRYER (FBD)- AND PROVISION OF MULTI PURPOSE DRYING PAVEMENT (MPDP) - PROVISION OF PH EQUIPMENT/MACHINERY - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 630,000.00 630,000.00 BASIC EDUCATIONAL FACILITIES REPAIR AND REHABILITATION OF CLASSROOMS 2,700,000.00 2,700,000.00 SALINTUBIG-PROVISION OF POTABLE WATER SUPPLY LEVEL 1 (SPRING) 1,000,000.00 1,000,000.00 CONSTRUCTION OF 2 UNIT STEEL FOOTBRIDGES 700,000.00 700,000.00 DEEP WELL LEVEL 1 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION FACILITY 2,000,000.00 2,000,000.00 CAPACITY BUILDING FORN CSOS 500,000.00 500,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM (HEP) SOLAR PHOTOVOLTAIC SOLAR HOME SYSTEM 20 THOUSAND PER HH 600,000.00 600,000.00 BARANGAY HEALTH STATION BASIC EQUIPMENT SUPPORT THRU HEALTH FACILITIES ENHANCEMENT PROGRAM 680,000.00 680,000.00 HIGH END REPAIR OF BARANGAY HEALTH STATIONS 1,000,000.00 1,000,000.00 CONTIONOUS CAPACITY BUILDING OF DAYCARE WORKERS, CHILD DEVELOPMENT WORKERS (SNP) AND PES WORKERS 500,000.00 500,000.00 PROVISION OF ECCD LEARNING MATERIALS/HYGIENE KIT MATERIALS 500,000.00 500,000.00 CONSTRUCTION OF DAYCARE CENTERS 700,000.00 700,000.00 751 PIO V. CORPUZ 1,070,000.00 - - - 7,530,631.00 - 1,899,369.00 - - 2,000,000.00 - - - - 12,500,000.00 EXPANDED AGRI-BUSINESS ACTIVITIES 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS- UNMOTORIZED BANCA WITH FISHING GEARS 570,000.00 570,000.00 VARIOUS WATER PROJECTS 3,131,000.00 3,131,000.00 SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT (SALINTUBIG) - UPGRADING OF LEVEL II WATER UPPLY SYSTEM TO LEVEL III - PROVISION OF WATER SUPPLY FOR BIRTHING FACILITY MUNICIPAL HEALTH OFFICE - EVACUATION FACILITY- 1 UNIT STANDARD EVACUATION CENTER 2,000,000.00 2,000,000.00 CONSTRUCTION OF DRAINAGE SYSTEM 1,509,631.00 1,509,631.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS FLOOD CONTROL-CONSTRUCTION OF SEA WALL 890,000.00 890,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 1,099,369.00 1,099,369.00 UPGRADING OF BARANGAY HEALTH STATION 800,000.00 800,000.00 CONSTRUCTION OF DAYCARE CENTERS 2,000,000.00 2,000,000.00 752 PLACER - - - - 14,100,000.00 - - - - 2,400,000.00 - - - - 16,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 CONTRUCTION OF WATERWORKS SYSTEM, LEVEL III, PHASE 4 - EXPANDDED SUPERVISED NEIGHBORHOOD PLAYGROUPS, PHASE 2 1,600,000.00 1,600,000.00 CONSTRUCTION OF WOMEN CONSTRUCTION CENTER / HALFWAY HOUSE FOR VAWC VICTIMS 2,400,000.00 2,400,000.00 753 SAN FERNANDO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 CONSTRUCTION AND IMPROVEMENT OF MUNICIPAL WATER SYSTEM (INSTALLATION OF DISTRIBUTION SYSTEM OF TWO WATER SOURCE) - 754 SAN JACINTO 630,000.00 500,000.00 - 1,870,000.00 7,000,000.00 - - - - 2,000,000.00 - - 500,000.00 - 12,500,000.00 FARM MECHANIZATION (PROVISION OF FARM MECHANIZATION AND EQUIPMENT TO FARMER S ASSOCIATION) 630,000.00 630,000.00 EXTENSION OF CONCRETE CANAL FOR IRRIGATION PURPOSES 500,000.00 500,000.00 REPAIR/REHAB OF OF SCHOOL BLDGS. CLASSROOMS 870,000.00 870,000.00 REPAIR/REHAB OF OF SCHOOL BLDGS. CLASSROOMS 1,000,000.00 1,000,000.00 VARIOUS WATER PROJECTS 7,000,000.00 7,000,000.00 UPGRADING/IMPROVEMENT OF LEVEL III WATER SUPPLY SYSTEMS WITH APPROPRIATE WATER TREATMENT SYSTEMS - CONST. OF FLOOD/RIVER CONTROL PROJECT 500,000.00 500,000.00 CONST. OF FLOOD/RIVER CONTROL PROJECT 500,000.00 500,000.00 CONST. OF CRISIS INTERVENTION CENTER 1,000,000.00 1,000,000.00 TECHNICAL VOCATIONAL TRAINING/ COMMUNITY-BASED TRAINING (CULINARY TRAINING, BEAUTY CARE, BUILDING WIRING, WELDING CARPENTRY, MASON, ETC) (CONST. OF SKILLS DEVELOPMENT CENTER 500,000.00 500,000.00 755 SAN PASCUAL 3,000,000.00 - 500,000.00 - 6,500,000.00 1,500,000.00 500,000.00 - - 2,000,000.00 - - 500,000.00 - 14,500,000.00 INFRASTRACTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - PROCUREMENT OF TRACTOR 3,000,000.00 3,000,000.00 NATIONAL GREENING PROGRAM - REHABILITATION OF MANGROVE AREAS 500,000.00 500,000.00 VARIOUS WATER PROJECTS 6,500,000.00 6,500,000.00 REHABILITATED WATER SYSTEM WITH TRANSMISSION AND DISTRIBUTION LINES, RESERVOIR INTAKE TANK, DEEPWELL AND POWER HOUSE - HOUSEHOLD ELECTRIFICATION PROGRAM (HEP) 1,500,000.00 1,500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRACTURE PROJECTS: CONSTRUCTION OF TWO (2) DAY CARE CENTERS 2,000,000.00 2,000,000.00 TECHNICAL VOCATIONAL TRAINING FOR OUT-OF-SCHOOL-YOUTH (OSY) 500,000.00 500,000.00 756 USON - - - 600,000.00 9,500,000.00 - - - - 800,000.00 600,000.00 - - 3,000,000.00 14,500,000.00 BASIC EDUCATION FACILITIES: REPAIR/ REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 VARIOUS WATER PROJECTS 7,500,000.00 7,500,000.00 SALINTUBIG-PROVISION OF POTABLE WATER SUPPLY - EVACUATION FACILITY 2,000,000.00 2,000,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT 800,000.00 800,000.00 YAMAN PINOY 600,000.00 600,000.00 CORE LOCAL ROAD CONSTRUCTION/ I14955MAINTENANCE/ REHABILITATION 3,000,000.00 3,000,000.00 SORSOGON 34,503,560.70 6,913,000.00 8,300,000.00 15,830,000.00 61,319,400.00 - 20,435,000.00 3,100,000.00 9,599,800.00 35,777,228.50 9,893,400.00 500,000.00 4,327,000.00 11,601,610.80 222,100,000.00 757 BARCELONA 750,000.00 1,213,000.00 - 500,000.00 - - 4,637,000.00 - - 1,000,000.00 2,500,000.00 500,000.00 - 1,400,000.00 12,500,000.00 VARIOUS SUPPORT FOR IRRIGATION 1,213,000.00 1,213,000.00 REHABILITATION OF IRRIGATION SYSTEM (BIAK -BATO & LAPAMIA) - VARIOUS DA PROJECTS 250,000.00 250,000.00 FISHERY PRODUCTION AND DEVELOPMENT - ESTABLISHMENT OF BANANA TRADING POST 500,000.00 500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 PROVISION AND DELIVERY OF QUALITY HEALTH CARE SERVICES/SOCIAL MOBILIZATION 4,637,000.00 4,637,000.00 SUSTAINABLE LIVELIHOOD PROGRAM-MICRO ENTERPRISE DEVELOPMENT 1,000,000.00 1,000,000.00 YAMAN PINOY PROGRAM SKILLS TRAINING FOR MSME 2,000,000.00 2,000,000.00 SHARED SERVICE FACILITY PROGRAM FOR HANDICRAFT PRODUCERS 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 1,400,000.00 1,400,000.00 ACCESS ROAD: SAN ANTONIO-SAN VICENTE SECTION - ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 500,000.00 500,000.00 758 BULAN 3,240,000.00 - - 3,180,000.00 2,500,000.00 - 6,048,000.00 1,500,000.00 - 3,232,000.00 1,000,000.00 - 1,800,000.00 1,000,000.00 23,500,000.00 TRAM LINES 1,000,000.00 1,000,000.00 VARIOUS DA PROJECTS 1,240,000.00 1,240,000.00 ORGANIC FERTILIZER PRODUCTION - PROVISION OF FISHING PARAPHERNALIA 500,000.00 500,000.00 FISH DRYING AND PACKAGING (TECHNOLOGY TRANSFER AND MARKET ENHANCEMENT) & CAPITALIZATION 500,000.00 500,000.00 DUAL PURPOSE (AGRO-TOURISM) (BARIIS LAKE SMALL IMPOUNDING PROJECT IRRIGATION- RECREATION) - BASIC EDUCATION FACILITIES 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES 500,000.00 500,000.00 GULAYAN SA PAARALAN 740,000.00 740,000.00 INNOVATIVE PROGRAMS ACCESS TO EDUCATION 940,000.00 940,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM 2,500,000.00 2,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CHP INCENTIVE ALLOCATION 1,200,000.00 1,200,000.00 CONSTRUCTION OF BRGY. HEALTH CENTER 1,000,000.00 1,000,000.00 HIRING OF 39 RHM 2,808,000.00 2,808,000.00 PABASA 500,000.00 500,000.00 PROCUREMENT OF DETECTO WEIGHING SCALE 540,000.00 540,000.00 INTEGRATED LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 SEA-K 1,000,000.00 1,000,000.00 CONSTRUCTION OF DCC 1,600,000.00 1,600,000.00 CAPABILITY BUILDING ACTIVITIES FOR VAWC CASES/PERPETRATOR, DAY CARE WORKERS AND PROVISION OF ECCD LEARNING MATERIALS 632,000.00 632,000.00 INDUSTRY CLUSTERING PROGRAM TECHNOLOGY UPGRADING, PRODUCT DEVELOPMENT & MARKETING ASSISTANCE PROGRAM 1,000,000.00 1,000,000.00 PROJECT TO BE IDENTIFIED 1,000,000.00 1,000,000.00 COMMUNITY BASED TRAINING FOR ENTERPRISE DEVELOPMENT 1,800,000.00 1,800,000.00 759 BULUSAN 2,750,000.00 - 500,000.00 700,000.00 4,900,000.00 - 600,000.00 - 500,000.00 1,550,000.00 500,000.00 - - - 12,000,000.00 SMALL SCALE IRRIGATION PROJECT 2,000,000.00 2,000,000.00 SUSTAINABLE AGRI-FISHETY BASED LIVELIHOOD & OTHER AGRI- FISHERY BUSINESS INVESTMENT 750,000.00 750,000.00 NATIONAL GREEENING PROGRAM (PRESERVED BVNP) 500,000.00 500,000.00 PROVISIONS OF SCHOOL FURNITURES 500,000.00 500,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 VARIOUS WATER PROJECTS 1,500,000.00 1,500,000.00 REHABILITATION OF POTABLE WATER SUPPLY - REHABILITATION OF POTABLE WATER SUPPLY 1,500,000.00 1,500,000.00 VARIOUS DILG PROJECTS 1,900,000.00 1,900,000.00 UPGRADING OF BULUSAN CULTURAL & SPORTS CENTER AS EVACUATION CENTER - BEMONC TRAINING, ALARM TRAINING 600,000.00 600,000.00 LOCAL TOURISM DEVELOPMENT PROJECT (BULUSAN LAKE DEVELOPMENT PROJECT) JUNCTION ROAD CARABAO CART RIDE & BVNP BIRD WATCHING 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 500,000.00 500,000.00 REHABILITATION OF DAY CARE CENTER 750,000.00 750,000.00 PROVISION OF ECCD LEARNING MATERIALS 300,000.00 300,000.00 OTOP STORE EXPRESS & ENTERPRISE DEVELOPMENT 500,000.00 500,000.00 760 CASIGURAN - - 500,000.00 1,000,000.00 9,500,000.00 - - - - 1,500,000.00 - - - - 12,500,000.00 MANGROVE REFORESTATION 500,000.00 500,000.00 REPAIR/REHAB OF ELEM. CLASSROOMS 1,000,000.00 1,000,000.00 EVACUATION CENTER - VARIOUS DILG PROJECTS 6,500,000.00 6,500,000.00 CONSTRUCTION OF RIZAL FLOOD CONTROL 3,000,000.00 3,000,000.00 REHAB/REPAIR OF DAY CARE CENTER 1,500,000.00 1,500,000.00 761 CASTILLA 1,253,560.70 - - - 1,799,800.00 - - - 1,799,800.00 1,445,228.50 - - - 8,201,610.80 14,500,000.00 ESTABLISHMENT OF MULTIPLIER GOAT FARM 1,253,560.70 1,253,560.70 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,799,800.00 1,799,800.00 DEVELOPMENT OF PILI-DULANGAN RIVER 899,900.00 899,900.00 TOURIST ARRIVAL CENTER 899,900.00 899,900.00 COCO-VINEGAR MAKING 545,328.50 545,328.50 CONSTRUCTION OF WOMEN AND CHILDREN CRISIS CENTER 899,900.00 899,900.00 VARIOUS LGU PROJECTS 8,201,610.80 8,201,610.80 CASTILLA RURAL OUTREACH PROGRAM - COMMUNITY GOAT PRODUCTION - CORE LOCAL ACCESS ROAD - 762 CITY OF SORSOGON (CAPITAL) 9,900,000.00 2,400,000.00 3,300,000.00 3,900,000.00 2,500,000.00 - 500,000.00 1,600,000.00 500,000.00 - 2,400,000.00 - - - 27,000,000.00 REHABILITAION OF TCPC IRRIGATION DAMS DAMAGED BY PREVIOUS TYPHOONS 2,400,000.00 2,400,000.00 VARIOUS DA PROJECTS 6,900,000.00 6,900,000.00 CONSTRUCTION OF SMALL WATER IMPOUNDING DAM (SWIP) FOR TAIL END OF SERVICE AREA OF EXISTING CIS - INSTALL SHALLOWTUBE WELL AS WATER SOURCE ESPECIALLY DURING DRY SEASON FOR IRRIGATION - ESTABLISHMENT OF MINI-FEED MILL FACILITY - ESTABLISHMENT OF OF VILLAGE LEVEL SHELLFISH (BALOKO SARDINES) PROCESSING FACILITY 1,200,000.00 1,200,000.00 REACTIVATION OF SEA WEEDS PROCESSING FACILITY (VILLAGE LEVEL) AT CABID-AN, NSTDC 500,000.00 500,000.00 ESTABLISHMENT OF 6 UNITS OF AQUA SILVI CULTURE PROJECTS 500,000.00 500,000.00 REHABILITATION AND MANAGEMENT OF TWO FISH SANCTUARY IN SORSOGON CITY 800,000.00 800,000.00 MITIGATING MEASURES TO CONTROL CONTINUOUS EROSION OF SOIL AT RIVER BANKS (RIPRAP) 2,400,000.00 2,400,000.00 MANGROVE ECO-PARK 900,000.00 900,000.00 REHABILITATION OF SMART SCHOOL IN BACON DISTRICT 2,400,000.00 2,400,000.00 EXPANSION OF ALTERNATIVE LEARNING SYSTEM PROGRAM 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FURNITURE 500,000.00 500,000.00 REHABILITATION OF SAN JUAN-BACON-STO DOMINGO WATER SYSTEM 1,500,000.00 1,500,000.00 CONSTRUCTION OF WATER SYSTEM ( ELEVATED TANK, WATER PUMP, AND DISTRIBUTIION LINE) 1,000,000.00 1,000,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 500,000.00 500,000.00 CAPACITY TRAINING WITH PROVISION OF START-UP KIT (DRESS MAKING, ABACA HANDICRAFT, MASONRY AND WELLNESS MASSAGE) 1,600,000.00 1,600,000.00 SUPPORT FACILITIES/ EQUIPMENT FOR LIVELIHOOD PROGRAM FOR COMMUNTIY BASE TOURISM IN PIER SITE (TALISAY AND NEARBY AREA) 500,000.00 500,000.00 SHARED SERVICE FACILITY FOR AGRI AND AQUA BASED ENTERPRISE (EQUIPMENT AND MATERIALS) 2,400,000.00 2,400,000.00 763 DONSOL 600,000.00 - 900,000.00 2,750,000.00 2,400,000.00 - 2,050,000.00 - 3,400,000.00 - - - 500,000.00 - 12,600,000.00 VARIOUS DA PROJECTS 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR FISHERFOLKS - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS FARM MECHANIZATION (MECHANICAL FLATBED DRYER) - ORGANIC FERTILIZER PRODUCTION - REFORESTATION PROGRAM (UPLAND COMMUNITIES) 900,000.00 900,000.00 REPAIR/REHABILITATION OF CLASSROOM 1,750,000.00 1,750,000.00 BASIC EDUCATION FACILITIES 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 1,500,000.00 1,500,000.00 CONSTRUCTION OF DRAINAGE CANAL WITH COVER - CAPABILITY BUILDING FOR CIVIL SOCIETY ORGANIZATIONS 900,000.00 900,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 1,400,000.00 1,400,000.00 RURAL HEALTH MIDWIVES PLACEMENT PROGRAM FOR GIDA 650,000.00 650,000.00 DEVELOPMENT OF ACCESS ROAD & TOURISM FACILITIES 3,400,000.00 3,400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR WOMEN 500,000.00 500,000.00 764 GUBAT 3,510,000.00 - - - - - - - - 8,990,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,510,000.00 3,510,000.00 PROCUREMENT OF FISHING VESSELS AND FISHING NETS - UPLAND TRACTOR - CONSTRUCTION OF MECHANICAL DRYER - CONSTRUCTION OF MECHANICAL DRYER - LIVESTOCK MULTIPLIER FARM - LIVESTOCK MULTIPLIER FARM - SLP-MICRO ENTERPRISE DEVELOPMENT 7,680,000.00 7,680,000.00 CASH FOR WORK 800,000.00 800,000.00 IMPROVEMENT OF DAY CARE CENTERS 510,000.00 510,000.00 765 IROSIN 2,000,000.00 - 800,000.00 1,800,000.00 4,813,000.00 - 500,000.00 - - 2,560,000.00 - - 527,000.00 - 13,000,000.00 VARIOUS DA PROJECTS 2,000,000.00 2,000,000.00 REHABILITATION OF CARACDACAN CIS - EXPANDED AGRI-BUSINESS-CARABAO-BASED ENTERPRISE - EXPANDED AGRI-BUSINESS- BROWN RICE - PROVISION OF FARM IMPLEMENTS - COMMUNITY-BASED REFORESTATION PROJECT - STRENGTHENING OFD BANTAY-GUBAT 800,000.00 800,000.00 ALTERNATIVE LEARNING SYSTEM 500,000.00 500,000.00 OPEN HIGH SCHOOL - FORMAL EDUCATION 500,000.00 500,000.00 REPAIR OF CLASSROOMS 800,000.00 800,000.00 CONSTRUCTION OF STO. NINO DOMINGO LEVEL II WATER SYSTEM 2,720,000.00 2,720,000.00 CONSTRUCTION OF ESCUALA, BUENAVISTA, LEVEL II WATER SYSTEM 960,000.00 960,000.00 CONSTRUCTION OF CASINI FOOT BRIDGE 500,000.00 500,000.00 CSO CAPACITY BUILDING 633,000.00 633,000.00 SCHISTOSOMIASIS CONTROL ELIMINATION OF SNAIL SITES 500,000.00 500,000.00 CONSTRUCTION OF CARRIEDO DAY CARE CENTER 640,000.00 640,000.00 CONSTRUCTION OF BACOLOD DAY CARE CENTER 640,000.00 640,000.00 CONSTRUCTION OF SAN PEDRO DAY CARE CENTER 640,000.00 640,000.00 CONSTRUCTION OF SAN JULIAN DAY CARE CENTER 640,000.00 640,000.00 TECHNICAL VOCATION TRAINING 527,000.00 527,000.00 766 JUBAN 900,000.00 1,600,000.00 - - 9,500,000.00 - - - - - - - 500,000.00 - 12,500,000.00 REHABILITATION OF CIS 1,000,000.00 1,000,000.00 REHABILITATION OF CIS 600,000.00 600,000.00 ORGANIC FERTILIZER PRODUCTION 900,000.00 900,000.00 CONSTRUCTION OF WATER SUPPLY SYSTEM 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 8,500,000.00 8,500,000.00 IMPROVEMENT OF BARANGAY SEA WALL - CONSTRUCTION OF DRAINAGE SYSTEM - CONSTRUCTION OF BARANGAY SEA WALL - TECHNICAL VOCATIONAL TRAINING/COMMUNITY BASED TRAINING 500,000.00 500,000.00 767 MAGALLANES 2,500,000.00 - 500,000.00 500,000.00 5,000,000.00 - 2,000,000.00 - - 2,000,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS 2,500,000.00 2,500,000.00 INFRASTRACTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVELOPMENT - INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVELOPMENT - PORTS AND WHARVES - NATIONAL GREENING PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT 2,000,000.00 2,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 2,000,000.00 2,000,000.00 768 MATNOG 2,000,000.00 - 800,000.00 1,500,000.00 1,000,000.00 - 2,700,000.00 - - 1,500,000.00 1,000,000.00 - 1,000,000.00 1,000,000.00 12,500,000.00 VARIOUS PROJECTS 2,000,000.00 2,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION AND DEVT. - POST HARVEST FACILITIES AND EQUIPMENT - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD - NATIONAL GREEING PROGRAM 800,000.00 800,000.00 REPAIR/REHAB OF SCHOOL BUILDINGS 1,500,000.00 1,500,000.00 CONST/REPAIR OF WATER SYSTEM 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,200,000.00 2,200,000.00 TRAINING INTERVENTION 500,000.00 500,000.00 CONSTRUCTION OF SANITATION FACILITIES 1,500,000.00 1,500,000.00 RURAL MICRO-ENTERPRISE DEVT. PROGRAM 1,000,000.00 1,000,000.00 LOCAL ROAD CONST./MAINTENANCE/REHABILITATION 1,000,000.00 1,000,000.00 TECHNICAL VOCATIONAL TRAINING/COMMUNITY BASED TRAINING 500,000.00 500,000.00 TECHNICAL VOCATION TRAINING/COMMUNITY-BASED TRAINING 500,000.00 500,000.00 769 PILAR 2,600,000.00 - 1,000,000.00 - 10,500,000.00 - - - 3,400,000.00 2,000,000.00 - - - - 19,500,000.00 FARM MECHANIZATION PROGRAM 2,000,000.00 2,000,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENTS 600,000.00 600,000.00 MANGROVE REFORESTATION 500,000.00 500,000.00 FRUIT BEARING TREE PLANTING PROGRAM 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF BARANGAY WATER SYSTEM 6,000,000.00 6,000,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 CONSTRCTION OF DISASTER-RESILIENT EVACUATION CENTER - PURCHASE OF RESCUE EQUIPMENT - DEVELOPMENT AND PROTECTION OF BANTIGUE MRFS AS ECO- TOURISM SITE 1,000,000.00 1,000,000.00 IMPROVEMENT OF TOURIST ASSISTANCE CENTER 2,400,000.00 2,400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) -MICRO ENTERPRISE DEVELOPMENT 2,000,000.00 2,000,000.00 770 PRIETO DIAZ - 1,700,000.00 - - 6,906,600.00 - 1,400,000.00 - - - 2,493,400.00 - - - 12,500,000.00 COMMUNAL IRRIGATION SYSTEM/CANALIZATION SYSTEM 1,700,000.00 1,700,000.00 VARIOUS WATER PROJECTS 6,906,600.00 6,906,600.00 UPGRADING/CONSTRUCTION OF WATER SYSTEM - HEALTH FACILITY ENHANCEMENT PROGRAM REHABILITATION OF EREGION XISTING BHS 1,400,000.00 1,400,000.00 COMMUNITY-BASED SKILLS TRAINING AND LIVELIHOOD 2,493,400.00 2,493,400.00 771 SANTA MAGDALENA 2,500,000.00 - - - - - - - - 10,000,000.00 - - - - 12,500,000.00 VARIOUS FISHERY PRJECTS 2,500,000.00 2,500,000.00 IMPROVEMENT OF MUNICIPAL FISH WHARF - CONST. OF PUBLIC MARKET 10,000,000.00 10,000,000.00 REGION VI 383,620,933.00 15,600,000.00 19,545,367.00 107,925,622.00 427,523,930.00 - 126,282,624.00 18,530,000.00 14,160,000.00 295,021,917.00 47,395,187.00 11,900,000.00 14,425,000.00 341,879,420.00 1,823,810,000.00 AKLAN 32,409,000.00 6,500,000.00 500,000.00 8,000,000.00 58,695,000.00 - 5,000,000.00 - 2,500,000.00 7,529,000.00 500,000.00 - 2,500,000.00 88,367,000.00 212,500,000.00 772 ALTAVAS 2,000,000.00 - - 800,000.00 1,500,000.00 - 500,000.00 - 500,000.00 - - - 500,000.00 6,700,000.00 12,500,000.00 SOCIAL INFRASTRUCTURE & LOCAL CAPABILITY BUILDING (SILCAB) - STRENGTHENING OF COOPERATIVES 500,000.00 500,000.00 IMPROVEMENT OF AGRIBUSINESS/AGRO-PROCESSING FACILITIES - CONSTRUCTION OF DISPLAY ROOMS, STORE ROOMS, AND MEETING HALLS 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - PROVISION OF TRACTOR, PLANTER/SEEDER, HARVESTER, THRESHER, SHELLER, FISHING MATERIALS, ETC. 500,000.00 500,000.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 REPAIR/REHAB OF SCHOOL BUILDINGS 500,000.00 500,000.00 SALINTUBIG (SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT) - PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 IMPROVEMENT OF EVACUATION CENTER TO INCLUDE CONSTRUCTION OF TOILETS (FOR MEN, WOMEN AND PWD'S) AND OTHER FACILITIES 500,000.00 500,000.00 PURCHASE OF VARIOUS RESCUE EQUIPMENT (AS PRESCRIBED BY THE OCD, DND) 500,000.00 500,000.00 PURCHASE OF HEALTH LABORATORY EQUIPMENTS 500,000.00 500,000.00 IMPROVEMENT OF TOURISM SITES (CONSTRUCTION OF PATHWAYS, COTTAGES, SIGNAGES) 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 6,700,000.00 6,700,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - REPAIR/REHAB/IMPROVEMENT OF ROADS - SHIELDED METAL ARC WELDING NC I & II TRAINING 500,000.00 500,000.00 773 BALETE - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS ROAD PROJECTS 12,500,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - REHABILITATION OF LOCAL ACCESS ROAD - 774 BANGA - - - - 6,500,000.00 - - - - 1,000,000.00 - - - 5,000,000.00 12,500,000.00 VARIOUS DILG PROJECTS 6,500,000.00 6,500,000.00 CONSTRUCTION OF 2-STOREY STANDARD EVACUATION CENTER WITH AMENITIES - 2- UNITS RESCUE VAN WITH EQUIPMENT - CONSTRUCTION OF BARANGAY POBLACION DAY CARE CENTER WITH AMENITIES 1,000,000.00 1,000,000.00 CONCRETING OF SAN ISIDRO BARANGAY ROAD,SAN ISIDRO, BANGA,AKLAN 2,000,000.00 2,000,000.00 CONCRETING OF VENTURANZA BARANGAY ROAD, VENTURANZA, BANGA,AKLAN 2,000,000.00 2,000,000.00 CONCRETING OF TABAYON BARANGAY ROAD, TABAYON, BANGA,AKLAN 1,000,000.00 1,000,000.00 775 BATAN 9,500,000.00 1,000,000.00 - 2,000,000.00 - - - - - - - - - - 12,500,000.00 REHABILITATION OF MUNICIPAL SEAPORT 2,500,000.00 2,500,000.00 MARINE RESERVE & FISH SANCTUARIES-MANGROVE REFORESTATION & FISHERY BASED LIVELIHOOD PROGRAM 3,000,000.00 3,000,000.00 VARIOUS FISHERY PRJECTS 4,000,000.00 4,000,000.00 AGRI-FISHERY TRAININGS - COMPREHENSIVE SKILLS TRAINING PROGRAM - AGRI-FISHERY TRAININGS- ENHANCEMENT OF FISHERFOLKS PRODUCTIVITY & INCOME THROUGH THE PROVISION OF MOTORIZED FISHING BOATS - INFRA SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT - IRRIGATION PROJECT-HOMESITE RICE, VEGETABLE & FRUITS, WATER IRRIGATION FACILITIES 1,000,000.00 1,000,000.00 REPAIR/ REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 776 BURUANGA - - - - 5,000,000.00 - - - - - - - - 7,500,000.00 12,500,000.00 IMPROVEMENT/EXPANSION/REHABILITATION OF BURUANGA WATER SYSTEM 5,000,000.00 5,000,000.00 VARIOUS ROAD PROJECTS 7,500,000.00 7,500,000.00 REHABILITATION/IMPROVEMENT OF SITIO ATINTIN ROAD TO BEL-IS - CONSTRUCTION OF CABUGAN ROAD TO SITIO TUMANSAPA - REHABILITATION/IMPROVEMENT OF SABANG ROAD TO SITIO BALICAO - REHABILITATION/IMPROVEMENT OF EL PROGRESO BARANGAY ROAD TO SITIO CABUGAO ROAD, NAZARETH, BURUANGA - CONSTRUCTION OF BUGNAY ROAD TO HABANA PROPER - REHABILITATION/IMPROVEMENT OF TIGUM BARANGAY ROAD TO SITIO SAPSAPON - REHABILITATION/IMPROVEMENT OF ALEGRIA ROAD TO BALUSBOS - 777 IBAJAY - - - - 3,000,000.00 - - - - - - - - 9,500,000.00 12,500,000.00 CONSTRUCTION OF SPRING LEVEL I WATER SYSTEM 2,000,000.00 2,000,000.00 CONSTRUCTION OF SPRING LEVEL I WATER SYSTEM 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 5,500,000.00 5,500,000.00 IMPROVEMENT/CONCRETING OF CORE LOCAL ROAD - IMPROVEMENT/CONCRETING OF CORE LOCAL ROAD - IMPROVEMENT/CONCRETING OF CORE LOCAL ROAD - IMPROVEMENT/CONCRETING OF CORE LOCAL ROAD - IMPROVEMENT/CONCRETING OF CORE LOCAL ROAD 2,000,000.00 2,000,000.00 IMPROVEMENT/CONCRETING OF CORE LOCAL ROAD 2,000,000.00 2,000,000.00 778 KALIBO 2,000,000.00 - - 1,000,000.00 1,500,000.00 - 3,500,000.00 - 2,000,000.00 500,000.00 - - - 2,000,000.00 12,500,000.00 IRRIGATION PROJECTS (SIP / STW/OSP) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 500,000.00 500,000.00 BASIC EDUCATION FACILITIES - REPAIR AND REHABILITATION OF 20 CLASSROOMS 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 1,000,000.00 1,000,000.00 PROCUREMENT OF RESCUE EQUIPMENTS (AS PRESCRIBED BY THE OCD, DND - CONSTRUCTION OF CANALS/DRAINAGE - CAPABILITY BUILDING FOR CSO'S 500,000.00 500,000.00 CAPABILITY BUILDING PROGRAMS FOR DOH HEALTH PROGRAMS 500,000.00 500,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION AND CAPABILITY BUILDING PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF HEALTH FACILITIES WITH PROVISION OF EQUIPMENTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF VISITOR INFORMATION CENTER AT TIGAYON HILL 1,000,000.00 1,000,000.00 MICRO AND SMALL TOURISM BUSINESS (TRAINING ON PRODUCT DEVELOPMENT AND PACKAGING) 500,000.00 500,000.00 PURCHASE OF EQUIPMENT AND CONSTRUCTION OF FACILITIES OF TIGAYON HILL 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION 2,000,000.00 2,000,000.00 779 LEZO 909,000.00 - - - 8,637,000.00 - - - - - - - - 2,954,000.00 12,500,000.00 PRODUCTION OF ORGANIC FERTILIZERS AND FARM IMPLEMENTS 909,000.00 909,000.00 CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM LEVEL II 4,090,000.00 4,090,000.00 CONSTRUCTION OF 2 STOREY OPERATION CENTER AND EVACUATION CENTER WITH BASIC FACILITIES 2,725,000.00 2,725,000.00 PROVISION OF ONE UNIT DISASTER RESCUE VEHICLE 777,000.00 777,000.00 PROCUREMENT OF DISASTER EQUIPMENT (12 GENERATOR SETS AND 12 CHAINSAWS) 1,045,000.00 1,045,000.00 VARIOUS ROAD PROJECTS 2,954,000.00 2,954,000.00 CONCRETING OF CORE LOCAL ROAD - 780 LIBACAO - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS ROAD PROJECTS 12,500,000.00 12,500,000.00 IMPROVEMENT/ CONCRETING OF CORE LOCAL ROAD OF SITIO MAMANGEANGSAPA ROSAL TO DIT-ANA CREEK, ROSAL - IMPROVEMENT/ CONCRETING OF CORE LOCAL ROAD OF SITIO BATAC, ROSAL TO BOUNDARYNLOCTUGA - IMPROVEMENT/ CONCRETING OF CORE LOCAL ROAD OF BARANGAY LOCTUGA TO LOCTUGA PROPER - IMPROVEMENT/ CONCRETING OF CORE LOCAL ROAD OF SITIO DUMAGONDONG, CALAMCAN TO BOUNDARY OGSIP - IMPROVEMENT/ CONCRETING OF CORE LOCAL ROAD OF MAGUGBA BRIDGE TO BOUNDARY AGMAILIG - IMPROVEMENT/ CONCRETING OF CORE LOCAL ROAD OF BONZA PROPER TO BARANGAY SIBALIW - IMPROVEMENT/ CONCRETING OF CORE LOCAL ROAD OF SITIO BALISONG, PAMPANGO TO SITIO UWAKAN, PAMPANGO - IMPROVEMENT/ CONCRETING OF CORE LOCAL ROADS OF SITIO UWAKAN, PAMPANGO TO ROSAL BOUNDARY - 781 MADALAG 9,500,000.00 - - - 3,000,000.00 - - - - - - - - - 12,500,000.00 VARIOUS PROJECTS 9,500,000.00 9,500,000.00 CONSTRUCTION OF 2 UNITS TRADING POST WITH FACILITIES LIKE CR AND WAITING SHED - CONSTRUCTION OF DRAINAGE CANAL, CATCH BASIN AND CONCRETE SHOULDER/SIDEWALK 3,000,000.00 3,000,000.00 782 MAKATO - - - 1,700,000.00 - - - - - 2,300,000.00 - - 2,000,000.00 6,500,000.00 12,500,000.00 REPAIR/REHABILITATION OF SCHOOLROOMS 1,700,000.00 1,700,000.00 REHABILITATION/REPAIR OF DAY CARE CENTERS 2,300,000.00 2,300,000.00 VARIOUS ROAD PROJECTS 6,500,000.00 6,500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - LIVELIHOOD TRAININGS AND PROVISION OF LIVELIHOOD TOOLS AND EQUIPMENTS FOR PINA/ABACA WEAVING AND WELDING. 2,000,000.00 2,000,000.00 783 MALAY 4,000,000.00 - - - 8,500,000.00 - - - - - - - - - 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (ORGANIC FERTILIZER) 2,000,000.00 2,000,000.00 POST HARVEST FACILITY (MULTI-PURPOSE DRYING PAVEMENT, MECHANICAL DRYER) 2,000,000.00 2,000,000.00 VARIOUS WATER PROJECTS 8,500,000.00 8,500,000.00 CONSTRUCTION/REHABILITATION OF POTABLE WATER SYSTEM (1579) - 784 MALINAO 500,000.00 - - - 2,500,000.00 - 1,000,000.00 - - - - - - 8,500,000.00 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (ORGANIC AGRICULTURE PRODUCTION) 500,000.00 500,000.00 CONCRETING OF KINALANGAY VIEJO BR 2,000,000.00 2,000,000.00 CONSTRUCTION OF FOOTBRIDGE BGY. NAVITAS 500,000.00 500,000.00 REHABILITATION OF RHU 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 8,500,000.00 8,500,000.00 CONCRETING OF LILO-AN BGY. ROAD - CONCRETINNG OF SAN DIMAS BGY. ROAD - CONCRETING OF OSMAN BARANGAY ROAD - CONCRETING OF MALANDAYON BGY. ROAD - CONCRETING OF TIGPALAS BGY. ROAD - CONCRETING OF SAN RAMON BGY. ROAD - CONCRETING OF SAN ROQUE BGY. ROAD - CONCRETING OF CABAYUGAN BGY ROAD - 785 NABAS 4,000,000.00 5,500,000.00 500,000.00 - 2,000,000.00 - - - - - 500,000.00 - - - 12,500,000.00 ACQUISITION OF 8 MOTORIZED FISHING BOATS WITH FISHING GEARS (FISHERY PRODUCTION AND DEVELOPMENT) 3,000,000.00 3,000,000.00 REHABILITATION OF EXISTING IRRIGATION FACILITY 5,500,000.00 5,500,000.00 HOG-FATTENING (SUSTAINABLE AGRI-BASED LIVELIHOOD) 1,000,000.00 1,000,000.00 TREE PLANTING PROJECT (NATIONAL GREENING PROGRAM) 500,000.00 500,000.00 VARIOUS WATER PROJECTS 1,500,000.00 1,500,000.00 INSTALLATION OF POTABLE WATER SUPPLY SYSTEM (SALINTUBIG) - CONSTRUCTION OF FOOT BRIDGE 500,000.00 500,000.00 PROVISION OF LIVELIHOOD - FOOD PROCESSING (SHARED SERVICE FACILITY) 500,000.00 500,000.00 786 NEWWASHINGTON - - - 1,000,000.00 7,500,000.00 - - - - - - - - 4,000,000.00 12,500,000.00 BASIC EDUCATION FACILITIES (REPAIR/REHABILITATION OF CLASSROOM) 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 7,500,000.00 7,500,000.00 CONSTRUCTION OF ONE (1) UNIT EVACUATION CENTER (WITH TOILETS FOR MEN, WOMEN AND PWD'S) - CONSTRUCTION OF DRAINAGE SYSTEM (FLOOD CONTROL) - CORE LOCAL ROAD (ASPHALT OVERLAY) 2,000,000.00 2,000,000.00 CONSTRUCTION OF FOOT BRIDGE (CORE LOCAL ROAD) 2,000,000.00 2,000,000.00 787 NUMANCIA - - - 1,500,000.00 3,500,000.00 - - - - - - - - 7,500,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REHABILITATION OF 3 SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FURNITURES 500,000.00 500,000.00 EXPANSION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 VARIOUS DILG PROJECTS 3,000,000.00 3,000,000.00 CONSTRUCTION OF DRAINAGE, POBLACION - SANTA MARIANOS SECTION - CONSTRUCTION OF FOOTBRIDGE AT JOYAO-JOYAO-ALIPUTOS, ALIPUTOS-LAG WEST - CONSTRUCTION OF ONE (1) UNIT EVACUATION CENTER WITH AMENITIES - CONST. OF CONCRETE ROAD AGLIPAY CEMETERY TO TECHNO DEMO FARM 1,000,000.00 1,000,000.00 CONSTRUCTION OF CONCRETE CORE ROAD 6,500,000.00 6,500,000.00 788 TANGALAN - - - - 5,558,000.00 - - - - 3,729,000.00 - - - 3,213,000.00 12,500,000.00 VARIOUS PROJECTS 5,558,000.00 5,558,000.00 CONSTRUCTION OF REVETMENT WALL - CONSTRUCTION OF 1 UNIT 2 CLASSROOM HIGH SCHOOL BUILDING WITH AMENITIES AND HAULING 1,243,000.00 1,243,000.00 CONSTRUCTION OF 1 UNIT 2 CLASSROOM ELEMENTARY SCHOOL BUILDING WITH AMENITIES 1,243,000.00 1,243,000.00 CONSTRUCTION OF 1 UNIT 2 CLASSROOM HIGH SCHOOL BUILDING WITH AMENITIES 1,243,000.00 1,243,000.00 CONSTRUCTION OF 0.67350 KM ACCESS ROAD WITH SPOT CONCRETING 1,800,000.00 1,800,000.00 CONSTRUCTION OF 0.30860 KM. ACCESS ROAD WITH SPOT CONCRETING 1,413,000.00 1,413,000.00 ANTIQUE 83,126,000.00 1,500,000.00 - 16,257,500.00 48,037,450.00 - 14,837,550.00 5,350,000.00 4,100,000.00 39,391,500.00 3,900,000.00 - 2,000,000.00 6,500,000.00 225,000,000.00 789 ANINI-Y 3,900,000.00 - - - 2,400,000.00 - 600,000.00 - 3,600,000.00 500,000.00 1,500,000.00 - - - 12,500,000.00 VARIOUS FISHERY PROJECTS 2,100,000.00 2,100,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (PURCHASE OF 10 MOTORIZED FISHING BOAT AND FISH NETS FOR MABUYONG & SITIO TIMBOBOG) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD & OTHER AGRI-FISHERY BUSINESS INVESTMENTS - SUSTAINABLE LIVELIHOOD PROGRAM - ORGANIC FERTILIZER PRODUCTION 800,000.00 800,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT 1,000,000.00 1,000,000.00 SPRING DEVEOPMENT LEVEL II WATER SYSTEM PROJECT OF BARANGAY IBA 1,000,000.00 1,000,000.00 IMPROVEMENT OF EVACUATION CENTER TO STANDARD SPECS WITH AMENITIES 1,400,000.00 1,400,000.00 REPAIR OF BARANGAY HEALTH STATION IN BARANGAY CASAY 600,000.00 600,000.00 FORMULATION OF MUNICIPAL TOURISM SITE PLAN 1,500,000.00 1,500,000.00 CONSTRUCTION OF VISITOR INFORMATION CENTER 1,000,000.00 1,000,000.00 SETTING-UP OF TOURISM DATABASE BY HIRING PERSONNEL ON CONTRACTUAL BASIS 500,000.00 500,000.00 PLANNING PRODUCT DEVELOPMENT MARKETING, STANDARDS & LOCAL LEGISLATION 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROJECT FOR MARKET VENDORS AND TRICYCLE DRIVERS (MOTOR OIL AND SPARE PARTS TRADING CENTER) 500,000.00 500,000.00 LOCAL AND REGIONAL ECONOMIC DEVELOPMENT 1,000,000.00 1,000,000.00 CIVIL SOCIETY ORGANIZATION (CSO) STRENGTHENING- ANINI-Y ENTREPRENEURIAL CAPABILITY BUILDING FOR SMES WITH MARKETING COMPONENT 500,000.00 500,000.00 790 BARBAZA 5,500,000.00 - - - 2,000,000.00 - 500,000.00 - - 2,000,000.00 - - - 2,500,000.00 12,500,000.00 VARIOUS DA PROJECTS 5,500,000.00 5,500,000.00 COMPLETE SET OF CHICKEN LAYER SHED FOR PRODUCTION AND AMENITIES - SLP(ORGANIC SWINE, CHICKEN & VEGESTABLE PRODUCTION) - NATIVE CHICKEN PRODUCTION - ACQUISITION OF APPROPRIATE DRYING FACILITIES FOR IMPROVED DRYING CAPABILITIES OF FARMERS ASSOCIATION - ESTABLISHMENT OF INTEGRATED POULTRY RAISING WITH VERMICULTURE - TULONG PANGHANAPBUHAY PARA SA ATING MGA GURO (SWINE DISPERSAL) - HOG BREEDING & SWINE FATTENING PRODUCTION - INSTALLATION OF BUOY MARKER - CONSTRUCTION OF PUBLIC MARKET/TRADING POST - CONSTRUCTION OF INTAKE BOX AND REPLACEMENT OF TERMINAL LINES FOR SPRING WATER DEVELOPMENT 500,000.00 500,000.00 SPRING DEVELOPMENT (CONSTRUCTION OF 1 RESERVOIR AND 2 SPRING BOX) 500,000.00 500,000.00 REHABILITATION OF EVACUATION CENTER WITH COMPLETE AMENITIES 500,000.00 500,000.00 REHABILITATION OF EVACUATION CENTER WITH COMPLETE AMENITIES 500,000.00 500,000.00 CONSTRUCTION OF BIRTHING CLINIC EQUIPMENT 500,000.00 500,000.00 MULTI-SUSTAINABLE LIVELIHOOD PROGRAM FOR GROSSLY AFFECTED/ TOTALLY DAMAGED YOLANDA TYPHOON VICTIMS 500,000.00 500,000.00 TRAINING PROGRAM FOR DRESSMAKING & SALT-MAKING PROJECTS FOR 4PS PARENT LEADER 500,000.00 500,000.00 PURCHASE OF VARIOUS EQUIPMENT AND MATERIALS OF THE FASHION SETTER-DRESSMAKING & TAILORING GROUP 500,000.00 500,000.00 PHASE 1 RETAINING WALL CONSTRUCTION 500,000.00 500,000.00 IMPROVEMENT OF POBLACION MUNICIPAL CORE ROAD 500,000.00 500,000.00 CONCRETING OF POBLACION-LISUB ROAD 1,000,000.00 1,000,000.00 OPENING OF HIGHWAY-LISUB (NORTH) ROAD 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 791 BELISON 3,150,000.00 - - - 2,300,000.00 - 2,400,000.00 1,000,000.00 - 2,650,000.00 500,000.00 - 500,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 1,850,000.00 1,850,000.00 ACQUISITION AND INSTALLMENT OF PROCESSING EQUIPMENT FOR DAIRY PRODUCTION - CONSTRUCTION OF ARTIFICIAL REEFS (FISH AGGREGATING DEVICE) 620,000.00 620,000.00 PROCUREMENT AND CONSTRUCTION OF MOTORIZED FISHING BOAT AND FISHING NETS 680,000.00 680,000.00 PROCUREMENT OF TWO (2) UNITS TRAVELLING RICE MILLER - ACQUISITION OF 9 UNITS HAND TRACTOR WITH TRAILER AND COMPLETE ACCESSORIES - EXPANSION OF LEVEL III POTABLE WATER SUPPLY (BELISON WATER DISTRICT) 1,300,000.00 1,300,000.00 PROCUREMENT OF 1 UNIT 4X4 PICK UP TYRE TRUCK RESCUE VEHICLE 1,000,000.00 1,000,000.00 UPGRADING OF BOROCBOROC BARANGAY HEALTH CENTER 800,000.00 800,000.00 UPGRADING OF CONCEPCION BARANGAY HEALTH STATION 800,000.00 800,000.00 UPGRADING OF ROMBANG BARANGAY HEALTH STATION 800,000.00 800,000.00 PROVISION OF STARTING CAPITAL KIT TO IDENTIFIED BENEFICIARIES COMING FROM THE BASIC SECTORS SUCH AS YOUTH, WOMEN AND PWD'S 1,000,000.00 1,000,000.00 CAPITAL ASSISTANCE FOR SARI-SARI STORE AND BUY-AND-SELL BUSINESS 800,000.00 800,000.00 PROVISION OF BUSINESS CAPITAL FOR MICRO-SMALL AND MEDIUM ENTERPRISES (MSMES) 350,000.00 350,000.00 VARIOUS KC PROJECTS 1,500,000.00 1,500,000.00 ESTABLISHMENT OF MUNICIPAL SHELTERED WORKSHOP AND AREA VOCATIONAL REHABILITATION CENTER - ESTABLISHMENT OF OTOP STORE FOR DAIRY PRODUCTS 500,000.00 500,000.00 SKILLS TRAINING FOR WELDING, FURNITURE MAKING, CELLPHONE AND COMPUTER REPAIRS, BEAUTY CARE AND HEALTH WELLNESS, AND FOOD PROCESSING 500,000.00 500,000.00 792 BUGASONG 1,700,000.00 - - - 9,075,000.00 - - - - 1,725,000.00 - - - - 12,500,000.00 INSTALLATION OF 150 UNITS CONCRETE ARTIFICIAL REEF AND 8 UNITS PAYAO 500,000.00 500,000.00 PROCUREMENT OF 20 UNITS MOTORIZED BOATS AND 20 FINGING GEARS (GILL NETS) 1,200,000.00 1,200,000.00 5 UNITS SALINTUBIG DEEP WELL LEVEL 1 1,575,000.00 1,575,000.00 VARIOUS DILG PROJECTS 7,500,000.00 7,500,000.00 FLOOD CONTROL (CONSTRUCTION OF 1 KM DRAINGE/ CANAL) - FLOOD CONTROL (CONSTRUCTION OF PILE DRIVING) - SUSTAINABLE LIVELIHOOD PROGRAM-MICRO ENTERPRISE DEVELOPMENT TRACK (MARKETING AND PROMOTION) 500,000.00 500,000.00 REPAIR/ UPGRADING OF 5 DAY CARE CENTERS 500,000.00 500,000.00 PROVISION OF ECC LEARNING MATERIALS AND HYGIENE KITS AND MATERIALS FOR 30 DAY CARE CENTERS 725,000.00 725,000.00 793 CALUYA 8,900,000.00 - - 1,600,000.00 - - - - - 2,000,000.00 - - - - 12,500,000.00 VARIOUS FISHERY PROJECTS 3,100,000.00 3,100,000.00 PROCUREMENT OF SEAWEED SEEDLINGS FOR FISHERFOLKS - PROVISION OF FISHNET/FISH GEARS FOR FISHERFOLKS - DRIED FISH PROCESSING PROJECT (PROVISION FOR TRAINING, EQUIPMENT AND MATERIALS) - ESTABLISHMENT OF POULTRY AND EGG LAYERING PROJECT 600,000.00 600,000.00 ENHANCEMENT/UPGRADING OF BANANA PROCESSING PROJECT 2,800,000.00 2,800,000.00 TRAINING PROGRAM FOR ORGANIC LIVESTOCK/POULTRY RAISING PROJECT 800,000.00 800,000.00 ESTABLISHMENT OF COCO-BASED PROCESSING PROJECT 1,600,000.00 1,600,000.00 GULAYAN SA PAARALAN 184,000.00 184,000.00 REHABILITATION OF CLASSROOMS AT SIBAY NATIONAL HIGH SCHOOL 240,000.00 240,000.00 REPAIR OF CALUYA NATIONAL HIGH SCHOOL CLASSROOMS 560,000.00 560,000.00 REPAIR OF CLASSROOMS IN CALUYA CENTRAL SCHOOL 480,000.00 480,000.00 ACQUISITION OF SCHOOL FURNITURES (CHAIRS) 136,000.00 136,000.00 ESTABLISHMENT OF COCO-OIL MILL PROJECT 2,000,000.00 2,000,000.00 794 CULASI 600,000.00 - - 5,000,000.00 5,900,000.00 - 1,000,000.00 - - - - - - - 12,500,000.00 PROCUREMENT OF 8 UNITS PUMPBOAT WITH COMPLETE ACCESSORIES 600,000.00 600,000.00 REPAIR/REHABILITATION OF 12 SCHOOLS 5,000,000.00 5,000,000.00 VARIOUS DILG PROJECTS 5,900,000.00 5,900,000.00 CONSTRUCTION OF 1,024.8 IN M. FLOOD CONTROL (GROUTED RIPRAP) WITH 3 IN M. ONE UNIT SINGLE BARREL BOX CULVERT WITH HAULING - EXPANSION OF SEA WALL - UPGRADING OF EZPERANZA BHS AS BIRTHING FACILITY 1,000,000.00 1,000,000.00 795 HAMTIC 4,900,000.00 - - 1,600,000.00 4,000,000.00 - 1,000,000.00 1,000,000.00 - - - - - - 12,500,000.00 CONSTRUCTION OF SOLAR DRYER 500,000.00 500,000.00 ABACA PLANTATION 600,000.00 600,000.00 DIVERSIFIED INTEGRATED FARMING SYSTEM 700,000.00 700,000.00 CATTLE FATTENING 600,000.00 600,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENT PROGRAM 500,000.00 500,000.00 LIVELIHOOD PROJECTS (DAIRY PRODUCTS) 2,000,000.00 2,000,000.00 PROVISION OF EDUCATION SUPPORT ASSISTANCE TO THE STUDENTS OF THE OPEN HIGH SCHOOL PROGRAM OF THE GENERAL LEANDRO FULLON NATIONAL SCHOOL 500,000.00 500,000.00 REPAIR AND REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION ABOT-ALAM PROGRAM/ INFORMATION DISSEMINATION PROJECT FOR TEEN-AGE PREGNANCY 600,000.00 600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 CONSTRUCTION OF 600 LM DRAINAGE SYSTEM - CAPABILITY BUILDING/ TRAINING AND RESCUE EQUIPMENT 500,000.00 500,000.00 EXPANSION, RENOVATION OF BHS BONGBONGAN I INTO A BIRTHING FACILITY 1,000,000.00 1,000,000.00 WORKERS INCOME AUGMENTATION PROJECT- VARIOUS LIVELIHOOD PROJECTS 1,000,000.00 1,000,000.00 796 LAUA-AN 9,082,500.00 - - 1,417,500.00 500,000.00 - - - - 1,500,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS 7,482,500.00 7,482,500.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY DEVELOPMENT: PURCHASE OF HANDTRACTOR WITH TRAILER - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY DEVELOPMENT: PURCHASE OF RICE THRESHER WITH ENGINE, MECHANICAL CORN SHELLER WITH ENGINE & MANUAL BLOWER - IRRIGATION PROJECT: SHALLOWTUBE WELL (STW) & OPEN SURFACE PUMP (OSP) 1,600,000.00 1,600,000.00 AGRO-PROCESSING FACILITIES: UPGRADING OF MUSCOVADO MILLS - CONSTRUCTION OF 2 STOREY TRADING POST - PROVISION OF SCHOOL FURNITURES 1,417,500.00 1,417,500.00 CAPABILITY BUILDING FOR CSOS (CSO STRENGTHENING) 500,000.00 500,000.00 CONSTRUCTION OF 2 UNITS DAY CARE CENTER WITH AMENITIES 1,500,000.00 1,500,000.00 797 LIBERTAD 2,200,000.00 1,500,000.00 - 140,000.00 7,000,000.00 - - - - 1,160,000.00 - - 500,000.00 - 12,500,000.00 DISTRIBUTION OF MOTORIZED BANCAS WITH FISH NETS FOR FISHERFOLKS 1,200,000.00 1,200,000.00 REHABILITATION OF MARINE PROTECTED AREAS AND PURCHASE OF MONITORING EQUIPMENT 1,000,000.00 1,000,000.00 CONSTRUCTION OF SMALL IRRIGATION FACILITIES FOR PAJO, CUBAY, SAN ROQUE, TABOC 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN PROJECT 140,000.00 140,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF ONE (1) UNIT EVACUATION CENTER WITH AMENITIES - ACQUISITION OF ONE UNIT RESCUE VEHICLE WITH COMPLETE EQUIPMENTS 2,000,000.00 2,000,000.00 CONSTRUCTION OF PILE DRIVE PROJECTS ALONG RIVER BANK 2,000,000.00 2,000,000.00 CAPABILITY BUILDING OF CSO 500,000.00 500,000.00 DRESSMAKING SKILLS TRAINING WITH 50 SEWING MACHINES PROVIDED 660,000.00 660,000.00 SKILLS TRAINING ON PRODUCT DEVELOPMENT AND DIVERSIFICATION AND INITIAL CAPITALIZATION FOR BARIWAND MAT WEAVERS 500,000.00 500,000.00 SKILLS TRAINING ON COSMETOLOGY AND PROVISION OF STARTER KIT 500,000.00 500,000.00 798 PANDAN 7,000,000.00 - - - 2,000,000.00 - 600,000.00 - 500,000.00 1,000,000.00 1,400,000.00 - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND BUSINESS INVESTMENTS ON GINGER AND TUMERIC 500,000.00 500,000.00 VARIOUS DA PROJECTS 5,450,000.00 5,450,000.00 MEAT PROCESSING TRAINING WITH EQUIPMENTS - ESTABLISHMENT OF BURI, BANANA, ABACCA PLANTATION PRODUCTION - EXPANSION SUSTAINABLE AGRI BUSINESS OF YOUTHS (GOAT RAISING) - ADDITIONAL FISHING PARAPHERNALIA (30 UNITS MOTORIZED BANCA) 1,050,000.00 1,050,000.00 PRE AND POST HARVEST FACILITIES - PURCHASE OF THRESHER, FARM IMPLEMENTS AND TOOLS - ORGANIC FERTILIZER PRODUCTION - REHABILITATION OF WATER PIPING (SALINTUBIG) - INSTALLATION OF 100M PIPELINE 500,000.00 500,000.00 PROCUREMENT OF DISASTER AND RESCUE VEHICLE AND EQUIPMENTS 1,000,000.00 1,000,000.00 CAPABILITY BUILDING OF CSOS 500,000.00 500,000.00 ORGANIZATION AND ESTABLISHMENT OF COMMUNITY HEALTH TEAMS OF 34 BARANGAYS 600,000.00 600,000.00 CONSTRUCTION OF BCBTO TOURISM CENTER 500,000.00 500,000.00 TRAINING ON SEWING WITH PROVISION OF EQUIPMENT 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD FOR OUT OF SCHOOL YOUTH ON MOTORCYCLE REPAIR WITH EQUIPMENTS 500,000.00 500,000.00 SKILLS TRAINING PROGRAM-BAGS AND COCONUT (YAMAN PINOY) 1,400,000.00 1,400,000.00 799 PATNONGON 4,500,000.00 - - 2,000,000.00 2,652,450.00 - 1,447,550.00 - - 1,900,000.00 - - - - 12,500,000.00 VARIOUS FISHERY PROJECTS 1,500,000.00 1,500,000.00 INFRA SUPPORT TO AGRI-FISHERIES (PROCUREMENT OF TRACTOR WITH TRAILER) - INFRA SUPPORT TO AGRI-FISHERIES (PURCHASE OF 15 BALSA AND 5 MOTORIZED BANCA) - POST-HARVEST SUPPORT/ CONSTRUCTION OF SOLAR AND MECHANICAL DRYER 3,000,000.00 3,000,000.00 REHABILITATION OF SCHOOL BUILDINGS/ CLASSROOMS 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 2,652,450.00 2,652,450.00 PROCUREMENT OF ONE UNIT BRAND NEWELF TYPE RESCUE VEHICLE - CONSTRUCTION OF 4 UNITS EVACUATION FACILITY - TRAINING OF 6 MIDWIVES ON RABIES ELIMINATION, TB CONTROL, DENGUE 1,447,550.00 1,447,550.00 CAPABILITY TRAINING PROGRAM FOR OUT OF SCHOOL YOUTH, WOMEN, PWD, SENIOR CITIZENS AND ERPATS 500,000.00 500,000.00 REHABILITATION OF 6 DAY CARE CENTERS 900,000.00 900,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE LIVELIHOOD PROGRAM FOR PUBLIC MARKET VENDORS PROVIDED WITH CAPITAL 500,000.00 500,000.00 800 SAN JOSE DE BUENAVISTA 7,049,000.00 - - 500,000.00 1,500,000.00 - 950,000.00 - - 2,501,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,645,000.00 3,645,000.00 ENHANCEMENT OF GB 2014 INTEGRATED DIVERSIFIED ORGANIC FARMING (RICE-BASED) - ENHANCEMENT OF PRE AND POST HARVEST FARM IMPLEMENTS AND FACILITIES - PURCHASE OF 5 UNITS SOLAR TUNNEL DRYER FOR FISH DRYING - PROVISION OF 30 UNITS FISHING BOATS 2,400,000.00 2,400,000.00 INSTALLATION OF ARTIFICIAL REEF AT THE MPA 500,000.00 500,000.00 INSTALLATION OF FISH AGGREGATE DEVICES/BALSA 504,000.00 504,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION ABOT-ALAM PROGRAM/INFORMATION DISSEMINATION PROJECT FOR TEENAGE PREGNANCY 500,000.00 500,000.00 UPGRADING OF WATER SUPPLY SYSTEM OF PANTAO 1,500,000.00 1,500,000.00 FUNCTIONALIZATION AND EQUIPPING OF BARANGAY HEALTH STATIONS PROVIDING MATERNITY CARE PACKAGE (MCP) SERVICES 950,000.00 950,000.00 CONSTRUCTION OF SUSTAINABLE WOODCRAFT AND FASHION ACCESSORIES PRODUCTION CENTER 500,000.00 500,000.00 DOY PACK RECYCLING/PROVISION OF 18 UNITS ELECTRIC SEWING MACHINES 501,000.00 501,000.00 ESTABLSIHMENT OF PNEUMATIC AND MANUAL VULCANIZING SHOP FOR ALL BARANGAY TODAS 800,000.00 800,000.00 CREATING EMPLOYMENT POSSIBILITIES FOR THE VULNERABLE SECTOR THRU PROMOTION OF ENTREPRENEURSHIP IN THE FOOD/MEAT PROCESSING INDUSTRY 700,000.00 700,000.00 801 SAN REMIGIO 3,500,000.00 - - 2,000,000.00 - - - - - 6,500,000.00 - - 500,000.00 - 12,500,000.00 1 UNIT SMALL IRRIGATION PROJECT 1,500,000.00 1,500,000.00 VARIOUS DA PROJECTS 2,000,000.00 2,000,000.00 FARM IMPLEMENTS- DRAFT ANIMALS FOR THE LANDLESS - PURCHASE OF PIPE HOSE 4 AND 2 INCHES DIAMETER - ESTABLISHMENT OF INTEGRATED FARMING SYSTEM - REPAIR OF SCHOOL BUILDING- INSTALLATION OF CR 1,000,000.00 1,000,000.00 REPAIR OF SCHOOL BUILDING- INSTALLATION OF HANDWASHING FACILITIES 1,000,000.00 1,000,000.00 CONSTRUCTION OF 2 DAY CARE CENTER WITH AMENITIES 1,800,000.00 1,800,000.00 VOCATIONAL TRAINING FOR SMALL ENGINE REPAIR WITH TOOL KITS 750,000.00 750,000.00 FEEDING PROGRAM FOR PRE-SCHOOL 500,000.00 500,000.00 CAPACITY BUILDING FOR CSOS 700,000.00 700,000.00 MICRO ENTERPRISE FOR LANDLESS HOUSEHOLDS 500,000.00 500,000.00 PRODUCT DEVELOPMENT AND TECHNOLOGY PROMOTION (NITO, BURI, BAMBOO, CORN) 500,000.00 500,000.00 SKILLS TRAINING FOR SENIOR CITIZENS AND PWD 750,000.00 750,000.00 ENHANCEMENT OF LIVELIHOOD SUPPORT TO WOMEN WITH STARTER KITS (SEWING/DRESSMAKING AND BEAUTY CULTURE) 1,000,000.00 1,000,000.00 SKILLS TRAINIG ON ELECTRONICS SERVICING 500,000.00 500,000.00 802 SEBASTE 6,200,000.00 - - - 1,500,000.00 - 2,300,000.00 - - 2,000,000.00 500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 4,500,000.00 4,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION (IMPROVE IRRIGATION SERVICES) - PURCHASE OF 10 THRESHERS, 10 TURTLE, 10 TRAILERS, 10 HANDTRACTORS) - SUSTAINABLE LIVELIHOOD PROGRAM (ORGANIC FERTILIZER PRODUCTION) - PURCHASE OF MOTORIZED BANCAS WITH ACCESSORIES 1,200,000.00 1,200,000.00 PURCHASE OF PATROL BOAT WITH COMPLETE ACCESSORIES 500,000.00 500,000.00 SLP (GOAT/CATTLE RAISING - 4PS) - CONSTRUCTION OF WATCH TOWER AND MINI-MARINE LABORATORY (PUNTOD SHOAL) FOR MARINE PROTECTED AREAS - SLP (HIGH VALUE CROP AND VEGETABLE PRODUCTION) - PROCUREMENT OF FIBER GLASS BOAT 1,000,000.00 1,000,000.00 CAPACITY DEVELOPMENT PROGRAM FOR CSOS 500,000.00 500,000.00 CONSTRUCTION OF BHS WITH FACILITIES 2,300,000.00 2,300,000.00 PROVISION OF ECCD LEARNING MATERIALS AND HYGIENE KITS FOR 10 DAY CARE CENTERS 500,000.00 500,000.00 SLP (RICE RETAIL - SEBASTE SECTORAL MPC) 500,000.00 500,000.00 SLP (BUYING AND SELLING PALAY OF AMEA) 500,000.00 500,000.00 SLP (SELLING OF OTHER COMMODITIES FOR SENIOR CITIZENS) 500,000.00 500,000.00 SLP (INDUSTRY DEVELOPMENT IN BARANGAY ALEGRE) 500,000.00 500,000.00 803 SIBALOM 5,150,000.00 - - 500,000.00 - - 1,000,000.00 3,350,000.00 - 2,500,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,150,000.00 3,150,000.00 LIVESOCK DISPERSAL PROJECT (50 HEADS CARABAOS FOR LANDLESS SECTOR) - CONSTRUCTION AND ESTABLISHMENT OF IRRIGATION PROJECTS (SHALLOWTUBE WELL) 2,000,000.00 2,000,000.00 ESTABLSIHMENT OF MUNICIPAL PEANUT SEED BANKING PROJECT - GULAYAN SA PAARALAN 500,000.00 500,000.00 TO CONSTRUCT BARANGAY HEALTH STATION 1,000,000.00 1,000,000.00 TO CONDUCT 8 CAPABILITY TRAINING DEVELOPMENT OF TOURISM, PEANUT, FOOD AND MEAT PROCESSING, BAMBOOCRAFT, COFFEE, GEMSTONE, BLACKSMITH AND POTTERY INDUSTRIES 3,350,000.00 3,350,000.00 CONSTRUCTION/ IMPROVEMENT OF DAY CARE CENTERS 1,500,000.00 1,500,000.00 FOOD AND MEAT PROCESSING TRAINING FOR SENIOR CITIZENS/ELDERLY/WOMEN/PWD/OSY AND PROVISION OF SIMPLE TOOLS/EQUIPMENT 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 804 TIBIAO 3,750,000.00 - - - 4,710,000.00 - 1,040,000.00 - - 1,000,000.00 - - 500,000.00 1,500,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,650,000.00 1,650,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION BY MALABOR FFA (PURCHASE OF 20 UNITS OF FISHING BOATS AND 10 UNITS FISH SHELTER) - ESTABLISHMENT OF INTEGRATIVE DIVERSIFIED ORGANIC DEMO-FARM IN 4 BARANGAYS - POST-HARVEST FACILITIES FOR 4 IRRIGATORS ASSOCIATION 2,100,000.00 2,100,000.00 VARIOUS WATER PROJECTS 3,000,000.00 3,000,000.00 CONSTRUCTION/ REHABILITAION OF WATER SYSTEM: BARANGAY ALEGRE & NATIVIDAD - CONSTRUCTION/ REHABILITAION OF WATER SYSTEM: BARANGAY SAN FRANCISCO NORTE - EXPANSION OF TIBIAO WATER SYSTEM (NEWWATER SOURCE) - FLOOD CONTROL (CONSTRUCTION OF DRAINAGE SYSTEM IN BRGY. POBLACION) 1,710,000.00 1,710,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM/PROVISION OF EQUIPMENT FOR BIRTHING CENTER 500,000.00 500,000.00 RENOVATION OF BRGY HEALTH STATION 540,000.00 540,000.00 ESTABLISHMENT OF MANTODA MOTORCYCLE SPARE PARTS, LUBRICANTS AND ACCESSORIES TRADING 500,000.00 500,000.00 PRACTICAL SKILLS TRAINING CUM LIVELIHOOD PROJECT ON GARMENT MAKING BY AKTIB 500,000.00 500,000.00 ROAD OPENING AT BARANGAY MATINEZ (SITIO ALIGTOS) 500,000.00 500,000.00 ROAD OPENING (CLEARING & GRAVELING): POBLACION TO MARTINEZ 500,000.00 500,000.00 ROAD OPENING (CLEARING & GRAVELING): STO. NINO ROSARIO TO NATIVIDAD 500,000.00 500,000.00 COMMUNITY-BASED TRAINING ON CARPENTRY & MASONRY 500,000.00 500,000.00 805 TOBIAS FORNIER 4,200,000.00 - - 1,500,000.00 2,500,000.00 - 2,000,000.00 - - 2,300,000.00 - - - - 12,500,000.00 LIVESTOCK DEVELOPMENT PROGRAM - BREEDING/UPGRADING OF STOCKS AND FATTENING 3,000,000.00 3,000,000.00 PURCHASE OF 14 UNITS PUMP BOATS WITH COMPLETE ACCESSORIES 1,200,000.00 1,200,000.00 REPAIR/ REHABILITATION OF CLASSROOMS 1,500,000.00 1,500,000.00 REHABILITATION OF POTABLE WATER SUPPLY SYSTEM 500,000.00 500,000.00 REHABILITATION OF POTABLE WATER SYSTEM: BRGY. BALLESCAS 500,000.00 500,000.00 VARIOUS DILG PROJECTS 1,500,000.00 1,500,000.00 CONSTRUCTION OF FOOTBRIDGES - CONSTRUCTION OF 1 UNIT BRGY HEALTH/BIRTHING STATION 2,000,000.00 2,000,000.00 SKILLS TRAINING ON GARMENTS & SEWING WITH PROVISION OF EQUIPMENT AND MATERIALS 500,000.00 500,000.00 CAPITAL ASSISSTANCE TO PWD'S, OSY, FARMERS AND FISHERFOLK AND PROVISION OF SEED CAPITAL 1,800,000.00 1,800,000.00 806 VALDERRAMA 1,844,500.00 - - - - - - - - 8,155,500.00 - - - 2,500,000.00 12,500,000.00 IRRIGATION PROJECT (OSP) - PURCHASE OF 11 UNITS OPEN SOURCE PUMP 858,000.00 858,000.00 POST-HARVEST FACILITY (PURCHASE OF 4 UNITS MPDP) 986,500.00 986,500.00 VARIOUS KC PROJECTS 8,155,500.00 8,155,500.00 IMPROVEMENT OF PATHWAY - CONSTRUCTION OF HANGING TRICYCLE LANE BRIDGE - CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES - CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES - IMPROVEMENT OF PATHWAY - CONSTRUCTION OF HANGING FOOT BRIDGE - CONSTRUCTION OF RIVER WALL/ PROTECTIVE CONCRETE MASONRY DIKE - CORE LOCAL ROAD CONSTRUCTION 2,500,000.00 2,500,000.00 CAPIZ 33,400,000.00 1,000,000.00 3,250,000.00 16,250,000.00 61,200,000.00 - 16,150,000.00 - - 44,650,000.00 3,500,000.00 - - 33,100,000.00 212,500,000.00 807 CUARTERO 3,500,000.00 - - - 6,500,000.00 - 2,000,000.00 - - 500,000.00 - - - - 12,500,000.00 CONSTRUCTION OF SMALL IRRIGATION PROJECT - SMALL IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 LIVESTOCK PRODUCTION PROGRAM 1,000,000.00 1,000,000.00 PROVISION OF TRAINING AND PRODUCTION INPUTS TO FARMERS (INCREASE AGRICULTURAL PRODUCTIVITY) 1,500,000.00 1,500,000.00 PROVISION OF POTABLE WATER SUPPLY (SALINTUBIG) - INSTALLATION OF PIPELINE AND CONSTRUCTION OF LEVEL II WATER SYSTEM 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 CONSTRUCTION OF DRAINAGE SYSTEM (ALONG THE POBLACION) - CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES - PROCUREMENT OF RESCUE VEHICLE AND EQUIPMENTS NEEDE FOR CALAMITY PURPOSES - UPGRADING OF MAIN HEALTH CENTER - REHABILITATION OF THE RHU 2,000,000.00 2,000,000.00 FOOD PROCESSING FOR UNEMPLOYED WOMEN (4PS PRIORITY) 500,000.00 500,000.00 808 DAO 1,200,000.00 - - 1,200,000.00 7,600,000.00 - 500,000.00 - - 1,500,000.00 500,000.00 - - - 12,500,000.00 POST-HARVEST FACILITIES AND EQUIPMENTS - MULTI PURPOSE DRYING PAVEMENT 1,200,000.00 1,200,000.00 BASIC EDUCATION FACILITIES: REPAIR / REHABILITATION OF CLASSROOM 700,000.00 700,000.00 BASIC EDUCATION FACILITIES: SCHOOL FURNITURE - PROVISION OF TABLES AND CHAIRS FOR IDENTIFIED SCHOOL SITES 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY (SALINTUBIG) - CONST. OF 1 DEEPWELL LEVEL II FOR POTABLE WATER SYSTEM 4,176,500.00 4,176,500.00 VARIOUS DILG PROJECTS 3,423,500.00 3,423,500.00 FLOOD CONTROL - CONSTRUCTION OF DRAINAGE SYSTEM, CANAL FOR PREVENTION OF FLOOD - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS HEALTH FACILITIES ENHANCEMENT PROGRAM - UPGRADING OF HEALTH FACILITIES IN TERMS OF BUILDINGS DESIGN AND EQUIPMENT 500,000.00 500,000.00 INFRASTRUCTURE PROJECTS: REPAIR / UPGRADING OF DAY CARE CENTERS (12 DAY CARE CENTERS REPAIR/REHAB) 1,000,000.00 1,000,000.00 CAPACITY BUILDING: PROVISION OF ECCD LEARNING MATERIALS DCC'S 500,000.00 500,000.00 LOCAL REGIONAL DEVELOPMENT - COMPETENT AND SKILLED LGU PERSONNEL ON BUSINESS PROMOTION 500,000.00 500,000.00 809 DUMALAG 1,500,000.00 - 2,000,000.00 1,500,000.00 5,000,000.00 - 500,000.00 - - 2,000,000.00 - - - - 12,500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES - ESTABLISHMENT OF SQUASH CANTON NOODLES- PROCESSING 1,500,000.00 1,500,000.00 NATIONAL GREENING PROGRAM - BAMBOO DEVELOPMENT 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES - REPAIR/REHABILITATION OF CLASSROOMS 1,500,000.00 1,500,000.00 PROVISION OF POTABLE WATER SYSTEM (SALINTUBIG) - CONSTRUCTION OF SPRING LEVEL I 4,000,000.00 4,000,000.00 FLOOD CONTROL (DRAINAGE FACILITY) - CONSTRUCTION OF 120 L.M. CANALS/DRAINAGE SYSTEM 1,000,000.00 1,000,000.00 RABIES ELIMINATION PROGRAM (THREE PRONGED APPROACHED) 500,000.00 500,000.00 CONSTRUCTION OF 1 UNIT DAYCARE CENTER WITH AMENITIES 1,000,000.00 1,000,000.00 REHABILITATION OF DAYCARE CENTERS FOR QUALITY LEARNING DEVELOPMENT 1,000,000.00 1,000,000.00 810 DUMARAO - - - - 1,500,000.00 - - - - 6,500,000.00 - - - 4,500,000.00 12,500,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,500,000.00 1,500,000.00 CONSTRUCTION OF 2-STOREY WOMEN CRISIS CENTER/ BAHAY PAG- ASA WITH AMENITIES 6,500,000.00 6,500,000.00 VARIOUS ROAD PROJECTS 4,500,000.00 4,500,000.00 CONSTRUCTION OF SINGLE LANE ROAD - 2KM SAND & GRAVEL ROAD - CONSTRUCTION OF SINGLE LANE ROAD - 1KM SAND & GRAVEL - CONSTRUCTION OF SINGLE LANE ROAD - 1KM SAND & GRAVEL - CONSTRUCTION OF SINGLE LANE ROAD - 2KM SAND & GRAVEL ROAD - 811 IVISAN 4,500,000.00 - - - 3,000,000.00 - - - - 5,000,000.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 3,500,000.00 3,500,000.00 MARINE RESERVE AND FISH SANCTUARY 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 3,000,000.00 3,000,000.00 CONSTRUCTION OF ONE UNIT STANDARD EVACUATION CENTER WITH AMENITIES - PURCHASE OF RESCUE EQIPMENT AS PRESCRIBED BY THE OCD - SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - CAPABILITY BUILDING ON FINANCIAL MANAGEMENT OF 500 FAMILIES 5,000,000.00 5,000,000.00 812 JAMINDAN - 1,000,000.00 - - 2,800,000.00 - 1,200,000.00 - - 4,000,000.00 - - - 3,500,000.00 12,500,000.00 CONSTRUCTION OF IRRIGATION SYSTEM ( FARMERS IN 30 BARANGAYS OF JAMINDAN) 1,000,000.00 1,000,000.00 EXTENSION OF WATER SYSTEM SPRING LEVEL III BENEFITED BY 717 HH'S 2,120,000.00 2,120,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II BENEFITED BY 139 HH'S 680,000.00 680,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM - CONSTRUCTION OF HEALTH CENTER 1,200,000.00 1,200,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: POTTERY MAKING / MANUFACTURING 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: PROVISION OF 5 UNITS BRAND NEWMOTORCYCLE AND OPENING OF MOTORCYCLE SPAREPARTS STORE FOR MEMBERS OF LATODA 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: PROVISION OF TRISIKAD AND AUGMENTATION OF CAPITAL FOR EXISTING SPAREPARTS STORE OF JAMAMUCO 500,000.00 500,000.00 CONSTRUCTION OF 1 UNIT DAY CARE CENTER WITH AMENITIES 1,000,000.00 1,000,000.00 VARIOUS LGU PROJECTS 3,500,000.00 3,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION - ORGANIC FERTILIZER PRODUCTION - CORE LOCAL ROAD CONSTRUCTION - 6KMS ROAD REHABILITATION, 500 L.M. SPOT CONCRETING - 813 MAAYON 1,450,000.00 - - - 4,500,000.00 - 2,650,000.00 - - 3,900,000.00 - - - - 12,500,000.00 CONSTRUCTION OF MULTI-PURPOSE SOLAR DRYER IN 4 BARANGAYS 1,450,000.00 1,450,000.00 VARIOUS WATER PROJECTS 2,500,000.00 2,500,000.00 PROVISION OF POTABLE WATER SUPPLY - EXPANSION/UPGRADING OF LEVEL II - PURCHASE OF 1 UNIT DUMP TRUCK AS RESCUE VEHICLE 2,000,000.00 2,000,000.00 REPAIR/UPGRADING OF 5 UNITS BARANGAY HEALTH STATION 2,650,000.00 2,650,000.00 CONSTRUCTION OF 5 UNITS DAY CARE CENTER 3,900,000.00 3,900,000.00 814 MAMBUSAO 2,500,000.00 - - - 5,500,000.00 - - - - 2,000,000.00 - - - 2,500,000.00 12,500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 1,000,000.00 1,000,000.00 ESTABLISHMENT OF 10 PALAYAMANAN MODEL FARM WITH BUDGET OF 50,000 EACH 500,000.00 500,000.00 ESTABLISHMENT OF HIGH VALUE CROPS AND VEGETABLES PRODUCTION AREA IN 3 PILOT BARANGAYS 1,000,000.00 1,000,000.00 PROVISION OF POTABLE WATER SUPPLY - CONST. OF DEEPWELL WITH OVERHEAD TANK AND DISTRIBUTION PIPES ACCESSORIES 5,000,000.00 5,000,000.00 CAPACITY BUILDING FOR CSOS - 700 PC QUESTIONNAIRE, TRAINING NEEDS, 700 TRAINED BENEFICIARIES, 5 COPIES BOUBD FINAL REPORT & 5 TRAINING MODULES 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SLP - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJETCS (BUILDINGS AND AMENITIES) 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 2,500,000.00 2,500,000.00 CONCRETING OF 320M LENGTH OF ROAD - CONCRETING OF 640M LENGTH OF ROAD - CONCRETING OF 320M LENGTH OF ROAD - CONCRETING OF 640M LENGTH OF ROAD - CONCRETING OF 320M LENGTH OF ROAD - 815 PANAY 3,550,000.00 - 750,000.00 1,500,000.00 2,000,000.00 - 1,700,000.00 - - 2,000,000.00 - - - 1,000,000.00 12,500,000.00 IRRIGATION PROJECT (SIP/STW/OSP) 1,000,000.00 1,000,000.00 VARIOUS DA PROJECTS 2,550,000.00 2,550,000.00 REHABILITATION OF PAWA PUBLIC MARKET (TRADING POST) - ORGANIC FERTILIZER PRODUCTION - COMMUNITY BASED ORGANIC FERTILIZER PRODUCTION PROJECT (10 PROJECTS - 80,000/PROJECT) - NATIONAL GREENING PROGRAM- COMMUNITY-BASED MAGROVE REHABILITATION 750,000.00 750,000.00 BASIC EDUCATION FACILITIES- REPAIR/ REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 BASIC EDUCATION FACILITIES- REPAIR/ REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 BASIC EDUCATION FACILITIES- REPAIR/ REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - EXPANSION OF LIBON-BINANTUAN WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-CONSTRUCTION OF BRGY. HEALTH STATION 1,200,000.00 1,200,000.00 TRAINING OF HEALTH PERSONNEL ON DIFFERENT PROGRAM OF THE DOH: MNCHN, PHN, STI/HIV AND AIDS, DENGUE CONTROL 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)- EMPLOYMENT FACILITATION TRACK 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)- CAPACITY BUILDING 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION/ REHABILITATION-LINAO- DAGA- BAGO GRANDE 1,000,000.00 1,000,000.00 816 PANITAN 1,000,000.00 - - 3,000,000.00 500,000.00 - 1,500,000.00 - - 5,000,000.00 - - - 1,500,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND BUSINESS INVESTMENT (COCONUT TREE AND FRUIT TREE GROWING) 1,000,000.00 1,000,000.00 REPAIR/ REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 REPAIR/ REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 REPAIR/ REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 PROCUREMENT/PURCHASE OF RESCUE EQUIPMENTS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM-RENOVATION AND IMPROVEMENT OF BHS 1,500,000.00 1,500,000.00 RENOVATION OF CULTURAL CENTER AS WOMEN CRISIS CENTER 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PR0GRAM (MICRO-ENTERPRISE DEVELOPMENT TRACK) 3,000,000.00 3,000,000.00 PROJECTS TO BE IDENTIFIED 1,500,000.00 1,500,000.00 817 PILAR 2,600,000.00 - - 2,800,000.00 3,500,000.00 - 1,600,000.00 - - - - - - 2,000,000.00 12,500,000.00 IRRIGATION PROJECTS(REHAB OF SMALL SCALE IRRIGATION PROJECT/ SMALL WATER IMPOUNDING PROJECT) 2,600,000.00 2,600,000.00 BASIC EDUCATION FACILITIES (REHABILITATION OF CLASSROOMS) 2,800,000.00 2,800,000.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 CONSTRUCTION OF EVACUATION FACILITY WITH AMENITIES - FLOOD CONTROL (CONSTRUCTION OF 280 L.M. DRAINAGE SYSTEM) - HEALTH FACILITY ENHANCEMENT PROGRAM - 4 UNITS PATIENT BEDS (2/3 CRANKS) WITH SIDE TABLE 1,000,000.00 1,000,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM (CONSTRUCTION/ EXPANSION OF RECOVERY ROOM) 600,000.00 600,000.00 CORE LOCAL ROAD (CONSTRUCTION OF 50 L.M. FOOT BRIDGE) 1,000,000.00 1,000,000.00 CORE LOCAL ROAD (1.5KMS SAND AND GRAVEL SINGLE LANE ROAD) 1,000,000.00 1,000,000.00 818 PONTEVEDRA 2,000,000.00 - - 1,000,000.00 2,500,000.00 - - - - 3,000,000.00 1,000,000.00 - - 3,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 2,000,000.00 2,000,000.00 PURCHASE OF 1 UNIT 4-WHEEL TRACTOR - CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT - GULAYAN SA PAARALAN 500,000.00 500,000.00 ABOT-ALAM PROGRAM (10 ALS) 500,000.00 500,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF 1 UNIT EVACUATION CENTER WITH AMENITIES - REHAB OF CANALS/ DRAINAGE/ CREEKS - 200M CREEK - CONSTRUCTION OF BALAY PAG-ULIKID - BALAY-PAGULIKID CRISIS CENTER 1,000,000.00 1,000,000.00 EXTEND SEED CAPITAL (GRANTED SEED CAPITAL TO 1000 HOUSEHOLDS) 2,000,000.00 2,000,000.00 YAMAN PINOY 1,000,000.00 1,000,000.00 LOCAL CORE ROAD CONSTRUCTION AND REHABILITATION 3,000,000.00 3,000,000.00 819 PRESIDENT ROXAS 2,000,000.00 - - 3,000,000.00 2,500,000.00 - - - - 1,500,000.00 - - - 3,500,000.00 12,500,000.00 CONSTRUCTION OF PORTS AND WHARVES (MARITA WHARF) 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES - REPAIR OF SCHOOL BUILDINGS 3,000,000.00 3,000,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 REHABILITATION OF HANGING FOOT BRIDGE (ARANGUEL) - CONSTRUCTION OF FOOT BRIDGE (BADIANGON) - FLOOD CONTROL - CONST. OF DRAINAGE SYSTEM (POBLACION SWA 1000000, RIP RAP - 1000000 - RESCUE EQUIPMENT - AMBULANCE WITH AMENITIES - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROTECTIVE SERVICES - REPAIR / UPGRADE OF DAY CARE CENTERS 1,500,000.00 1,500,000.00 CORE LOCAL ORAD CONSTRUCTION MAINTENANCE - BRGY ROAD CONCRETING AT BADIANGON, PANTALAN & BAYUYAN 3,500,000.00 3,500,000.00 820 ROXAS CITY 3,000,000.00 - - 2,000,000.00 2,000,000.00 - 2,000,000.00 - - 2,000,000.00 1,500,000.00 - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND BUSINESS INVESTMENT 3,000,000.00 3,000,000.00 INNOVATIVE PROGRAM TO ACCESS EDUCATION 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 2,000,000.00 2,000,000.00 CONSTRUCTION OF EVACUATION FACILITY WITH AMENITIES - PROCUREMENT OF ONE (1) UNIT RESCUE EQUIPMENT (BOOM TRUCK) - HEALTH EHANCEENT PROGRAM 2,000,000.00 2,000,000.00 SLP MICRO ENTERPRISE - PROVISION OF LIVELIHOOD PROGRAM TO 250 BENEFICIARIES 2,000,000.00 2,000,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM (INCREASE INCOME) 1,500,000.00 1,500,000.00 821 SAPIAN - - - - 9,000,000.00 - 1,500,000.00 - - - - - - 2,000,000.00 12,500,000.00 VARIOUS DILG PROJECTS 9,000,000.00 9,000,000.00 CONSTRUCTION OF EVACUATION CENTER WITH FACILITIES AND AMENITIES - CONSTRUCTION OF EVACUATION CENTER WITH FACILITIES AND AMENITIES - HEALTH FACILITIES ENHANCEMENT PROGRAM - CONSTRUCTION OF BARANGAY HEALTH STATION 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION - 2.0 KMS FMR (SPOT CONCRETING), 200M CONCRETE ROAD PAVEMENT 2,000,000.00 2,000,000.00 822 SIGMA 1,600,000.00 - 500,000.00 250,000.00 2,800,000.00 - - - - 750,000.00 500,000.00 - - 6,100,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,600,000.00 1,600,000.00 LIVESTOCK, TILAPIA FINGERLINGS, VEGETABLE AND RICE SEEDS DISPERSAL - CONSTRUCTION OF 1 UNIT SMALL IMPOUNDING PROJECTS - ORGANIC FERTILIZER PRODUCTION - ESTABLISHMENT OF COMPOSTING FACILITIES - NATIONAL GREENING PROGRAM - REFORESTATION OF FORESTLAND (BRGY PINAMATICAN) 500,000.00 500,000.00 ESTABLISHMENT OF SCHOOL GARDEN WITH COMPOSTING PROJECT 250,000.00 250,000.00 REHAB/EXPANSION/UPGRADING OF LEVEL III WATER SUPPLY SYSTEM WITH WATER TREATMENT 800,000.00 800,000.00 CONSTRUCTION/REHABILITATION OF FOOT BRIDGE 2,000,000.00 2,000,000.00 PROVISION FOR THE PREVENTION OF ABUSE AND EXPLOITATION 750,000.00 750,000.00 YAMAN PINOY - COMMUNITY LEVEL CAPABILITY/LIVELIHOOD PROGRAM 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 2,300,000.00 2,300,000.00 SPOT CONCRETING OF VARIOUS BARANGAY ROADS IN 4 BARANGAYS - SPOT CONCRETING OF VARIOUS ROADS IN 3 BARANGAYS - SPOT CONCRETING OF VARIOUS BARANGAY ROADS IN 4 BARANGAYS 1,900,000.00 1,900,000.00 SPOT CONCRETING OF VARIOUS BARANGAY ROADS IN 4 BARANGAYS 1,900,000.00 1,900,000.00 823 TAPAZ 3,000,000.00 - - - - - 1,000,000.00 - - 5,000,000.00 - - - 3,500,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION - USING OF SILOD WASTE MATERIAL AT THE MATERIAL RECOVERY FACILITIES OF THE MUNICIPALITY 3,000,000.00 3,000,000.00 MATERNAL, NEO-NATAL, CHILD HEALTH AND NUTRITION - PROVIDING BASIC EQUIPMENT FOR ASSESSMENT OF NUTRITIONAL STATUS, FOR EXAMINATION OF PATIENTS 500,000.00 500,000.00 PROVIDING MEDICAL EQUIPMENTS THAT WILL ADDRESS NON COMMUNICABLE DISEASES IN THE MUNICIPALITY 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (ABACA PRODUCTION) 5,000,000.00 5,000,000.00 VARIOUS ROAD PROJECTS 3,500,000.00 3,500,000.00 CORE LOCAL ROAD CONSTRUCTION/ REHABILITATION - 300M X 5M X 0.20M ROAD - CORE LOCAL ROAD CONSTRUCTION/REHABILITATION - 300M X 5M X 0.15M ROAD - CORE LOCAL ROAD CONSTRUCTION/ REHABILITATION - 300M X 5M X 0.20M ROAD - GUIMARAS 8,250,000.00 - - 13,594,300.00 5,000,000.00 - 10,000,000.00 450,000.00 - 12,400,000.00 1,800,000.00 1,500,000.00 400,000.00 9,105,700.00 62,500,000.00 824 BUENAVISTA 850,000.00 - - 3,000,000.00 1,000,000.00 - 5,100,000.00 - - 2,550,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 850,000.00 850,000.00 PURCHASE OF 5 UNITS MOTORIZED FISHING BOAT WITH FISH NET - MARINE RESERVE AND FISH SANCTUARY (AR) ADDITIONAL CONCRETE JACKSTONE TO BE PUT TO COASTAL AREA - REPAIR/ REHABILITATION OF 15 CLASSROOMS 3,000,000.00 3,000,000.00 CONSTRUCTION OF LEVEL 1 WATER SYSTEM (SEA ARC) 500,000.00 500,000.00 SALVACION-DAGASAN EXPANSION OF LEVEL III WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF BHS PIA 1,500,000.00 1,500,000.00 PROVIDE EQUIPMENT OF BHS AVILA 500,000.00 500,000.00 PURCHASE OF EQUIPMENT FOR HEMODIALYSIS 1,100,000.00 1,100,000.00 UPGRADING OF FIVE (5) BHS (NAVALAS, SAN ROQUE, ZALDIVAR, TAMINLA & SAN MIGUEL) 2,000,000.00 2,000,000.00 SKILLS TRAINING AND CAPABILITY BUILDING SEMINAR FOR LIVELIHOOD DEVELOPMENT BENEFICIARIES 1,000,000.00 1,000,000.00 CONDUCT SEMINAR/TRAINING/WORKSHOPS TO HELP THE BENEFICIARIES TO START THEIR LIVELIHOOD PROGRAM AND BUSINESS 550,000.00 550,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS KC PROJECTS 1,000,000.00 1,000,000.00 ESTABLISHMENT OF PRODUCTION CENTER AND PURCHASE OF SEWING MACHINE - REPAIR/UPGRADING OF TWO (2) DAY CARE CENTERS (BRGY DARAGAN & SUPANG) - CONCRETING OF PIA-CALALAN ROAD (TPAS ARC) - 825 JORDAN 1,700,000.00 - - 2,500,000.00 500,000.00 - - - - 6,000,000.00 1,800,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,700,000.00 1,700,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT/PROCUREMENT OF 23 MOTORIZED FISHING BOATS - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS/CONDUCT OF LIVELIHOOD TRAININGS - ESTABLISHMENT OF TRADING POST - CONSTRUCTION OF ESPINOSA WHARF - REHABILITATION/IMPROVEMENT OF CLASSROOMS 2,500,000.00 2,500,000.00 CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR PWDS, IPS, 4PS, FARMERS AND FISHERFOLKS 1,000,000.00 1,000,000.00 UPGRADING OF DCCS, CRISIS CENTER, PROVISION OF ECCD AND CONTINOUOS CAPABILITY BUILDING 5,000,000.00 5,000,000.00 LRED: FORMULATION OF REVENUE & INVESTMENT CODE 650,000.00 650,000.00 LRED: FORMULATION OF ECONOMIC DEVELOPMENT PLAN 650,000.00 650,000.00 CAPABILITY LIVELIHOOD PROGRAM FOR CASHEWNUTS GROWERS 500,000.00 500,000.00 826 NUEVA VALENCIA 2,500,000.00 - - 3,500,000.00 1,500,000.00 - 1,000,000.00 - - 1,500,000.00 - - - 2,500,000.00 12,500,000.00 IMPROVEMENT OF PUYO WHARF (FENCING, STORAGE AREA, LIGHTING, CR & ANCHORAGE) 2,500,000.00 2,500,000.00 BASIC EDUCATION FACILITIES: REPAIR, REHAB, REPLACEMENT, COMPLETION OF SCHOOL BUILDINGS/ CLASSROOMS, PROVISION OF SCHOOL FURNITURE 3,500,000.00 3,500,000.00 VARIOUS DILG PROJECTS 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES, EVAC FACILITY (IMPROVEMENT OF EXISTING INFRA FOR EVAC FACILITIES) - HEALTH FACILITY ENHANCEMENT PROJECT- PROCUREMENT OF EQUIPMENT FOR BIRTHING FACILITY 1,000,000.00 1,000,000.00 LIVELIHOOD PROJECTS FOR SOLO PARENTS, RURAL IMPROVEMENT CLUB, PANTAWID PAMILYANG PILIPINO PROGRAM (4PS), PERSONS WITH DISABILITIES & OUT OF SCHOOL YOUTH ( NATIVE CHICKEN PROJECT) 1,000,000.00 1,000,000.00 COMPLETION OF SENIOR CITIZENS CENTER 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION/ REHAB OF CORE ROADS - 827 SAN LORENZO 3,200,000.00 - - 2,500,000.00 2,000,000.00 - 3,000,000.00 450,000.00 - 950,000.00 - - 400,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 3,200,000.00 3,200,000.00 ESTABLISHMENT OF BIOLOGICAL CONTROL LABORATORY - ESTABLISHMENT OF FISH LANDING AREA - FARM MECHANIZATION (PROCUREMENT OF 12 UNITS HAND TRACTORS WITH TRAILERS) - REPAIR REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 REPAIR REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 REPAIR REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 REPAIR REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 ESTABLSIHMENT OF WATER AND SANITATION SYSTEM 2,000,000.00 2,000,000.00 RENOVATION/ REPAIR OF BARANGAY HEALTH STATION 3,000,000.00 3,000,000.00 ESTABLISHMENT OF ROLLING STORE FOR SOLO PARENT AND DISADVANTAGED GROUP OF WOMEN 450,000.00 450,000.00 CAPABILITY BUILDING FOR SUSTAINABLE LIVELIHOOD (4PS BENEFICIARIES) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROJECTS PROVISIONS OF EMPLOYMENT (SKILLS ENHANCEMENT FOR 4PS) 450,000.00 450,000.00 SKILLS ENHANCEMENT TRAINING FOR INCOME GENERATING PROJECT OF YOUTH 400,000.00 400,000.00 828 SIBUNAG - - - 2,094,300.00 - - 900,000.00 - - 1,400,000.00 - 1,500,000.00 - 6,605,700.00 12,500,000.00 REPAIR/REHABILITATION OF 6 SCHOOLS 2,094,300.00 2,094,300.00 REPAIR OF TANGLAD/MAABAY BHS/HNP 900,000.00 900,000.00 IMPROVEMENT/ REPAIR OF BALANGA DAY CARE CENTER 300,000.00 300,000.00 IMPROVEMENT/ REPAIR OF NAOWAY DAY CARE CENTER 300,000.00 300,000.00 CONSTRUCTION OF PALHE DAY CARE CENTER 800,000.00 800,000.00 VARIOUS ROAD PROJECTS 6,605,700.00 6,605,700.00 ROAD IMPROVEMENT OF 1.2449KM FROM DASAL PROPER TO SITIO PITONGAN - ROAD IMPROVEMENT OF 0.6006KM FROM BUBOG PROPER TO SEBASTE-BUBOG E/S - ROAD IMPROVEMENT OF 1.7251KM FROM SITIO PIN-AS TO SITIO CAMAB-AN - ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,500,000.00 1,500,000.00 ILOILO 96,865,000.00 5,000,000.00 5,600,000.00 20,610,000.00 141,223,480.00 - 23,741,250.00 1,500,000.00 3,500,000.00 76,106,150.00 18,320,000.00 2,500,000.00 1,300,000.00 167,734,120.00 564,000,000.00 829 AJUY 6,500,000.00 - - - 3,500,000.00 - - - - 1,000,000.00 1,500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 6,500,000.00 6,500,000.00 TRADING POST (CONSTRUCTION OF MUNICIPAL FISH LANDING AND TRADING CENTER) - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - SAGANA AT LIGTAS NA TUBIG SA LAHAT(SALINTUBIG)- PROVISION OF POTABLE WATER SUPPLY 2,000,000.00 2,000,000.00 PROCUREMENT OF SETS OF RESCUE EQUIPMENTS AND LIFE SAVING MATERIALS FOR DISASTER AND EMERGENCY RESPONSE 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS (UPGRADING OF DAY CARE CENTERS) 1,000,000.00 1,000,000.00 YAMAN PINOY 1,500,000.00 1,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 830 ALIMODIAN - - - - 2,000,000.00 - - - - - - - - 10,500,000.00 12,500,000.00 CONSTRUCTION OF ONE (1) UNIT STANDARD EVACUATION CENTER AND PROCUREMENT OF RESCUE EQUIPMENT FOR MONITORING AND EVALUATION 2,000,000.00 2,000,000.00 VARIOUS ROAD PROJECTS 8,500,000.00 8,500,000.00 CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (500 LM SINGLE LANE SAND AND GRAVEL BRGY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (100 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (100 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (100 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (100 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (100 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (100 LM CONCRETED BARANGAY ROAD) - PRODUCTION OF ORGANIC HIGH VALUE CROPS AND NATIVE CHICKEN 2,000,000.00 2,000,000.00 CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (500 LM SINGLE LANE SAND AND GRAVEL BRGY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (500 LM SINGLE LANE SAND AND GRAVEL BRGY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (100 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (100 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (50 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (50 LM CONCRETED BARANGAY ROAD) - CONSTRUCTION/CONCRETING OF CORE LOCAL ROADS (50 LM CONCRETED BARANGAY ROAD) - 831 ANILAO - - - 210,000.00 5,000,000.00 - - - - - - - - 7,290,000.00 12,500,000.00 GULAYAN SA PAARALAN 210,000.00 210,000.00 CONSTRUCTION OF POTABLE WATER SUPLY (SALINTUBIG) 5,000,000.00 5,000,000.00 VARIOUS LGU PROJECTS 7,290,000.00 7,290,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (93 HOUSEHOLDS PROVIDED WITH ASSISSTANCE FOR FOOD PRODUCTION) - CONSTRUCTION OF CORE ROADS (1,250 LM CORE ROADS) - 832 BADIANGAN 3,000,000.00 - - 220,000.00 - - - - - 4,560,000.00 - - - 4,720,000.00 12,500,000.00 CONSTRUCTION OF TRADING POST 3,000,000.00 3,000,000.00 GULAYAN SA PAARALAN 220,000.00 220,000.00 CONSTRUCTION OF 2 UNITS DAY CARE CENTERS WITH AMENITIES 1,560,000.00 1,560,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (EMPLOYMENT FACILITATION TRACK) 3,000,000.00 3,000,000.00 CONSTRUCTION/IMPROVEMENT OF CORE LOCAL ROADS (BRGY CATUBIG & BRGY BITAOYAN 1 KM) 1,000,000.00 1,000,000.00 IMPROVEMENT OF CORE LOCAL ROADS (BRGY ODIONGAN & BRGY AGUSIPAN 1.5 KM) 820,000.00 820,000.00 IMPROVEMENT OF CORE LOCAL ROADS (BRGY AGUSIPAN 1 KM) 800,000.00 800,000.00 VARIOUS ROAD PROJECTS 1,500,000.00 1,500,000.00 CORE LOCAL ROADS (CONSTRUCTION/IMPROVEMENT OF BRGY BOTONG & BRGY MAPILI GRANDE ROAD - REHABILITATION OF CORE LOCAL ROADS (BRGY BOTONG TO BRGY CALANSANAN ROAD (2.7 KM) - REHABILITATION OF CORE LOCAL ROADS (BRGY BUDIAWE & BRGY LINAYUAN 1.5 KM) - IMPROVEMENT OF CORE LOCAL ROADS (BRGY CABANGAAN & BRGY TAMOCOL 1 KM) 600,000.00 600,000.00 833 BALASAN 1,000,000.00 1,000,000.00 500,000.00 - 6,150,000.00 - - 500,000.00 500,000.00 1,850,000.00 1,000,000.00 - - - 12,500,000.00 IRRIGATION PROJECTS (EXTENSION OF CANAL LINNING) 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FARMERS (FARM MACHINERIES AND INPUTS) 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM (TREE PLANTING ACTIVITIES FOR UPLAND BARANGAYS) 500,000.00 500,000.00 VARIOUS DILG PROJECTS 6,150,000.00 6,150,000.00 CONSTRCUTION OF ONE (1) UNIT EVACUATION CENTER WITH AMENITIES - FLOOD CONTROL PROJECT (CONCRETING OF SIBAJAO RIVER WALL) - LIVELIHOOD PROJECT FOR DISPLACED WORKERS 500,000.00 500,000.00 PHYSICAL HISTORICAL HERITAGE I (ENHANCEMENT TOURISM PROMOTION) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - EMPLOYMENT FACILITATION TRACK 500,000.00 500,000.00 CONSTRUCTION OF THREE (3) DAY CARE CENTERS WITH AMENITIES 1,350,000.00 1,350,000.00 OTOP DISPLAY CENTER (PROMOTION OF BRGY ENGAGE IN SME) 1,000,000.00 1,000,000.00 834 BANATE 4,510,000.00 - - 150,000.00 3,000,000.00 - - - - 2,340,000.00 - - - 2,500,000.00 12,500,000.00 LIVELIHOOD PROJECT 2,510,000.00 2,510,000.00 CONSTRUCTION OF TRADING POST 2,000,000.00 2,000,000.00 GULAYAN SA PAARALAN 150,000.00 150,000.00 CONSTRUCTION OF EVALUATION FACILITY WITH AMENITIES 3,000,000.00 3,000,000.00 CONSTRUCTION OF 3 UNITS DAYCARE CENTERS USING THE TANDARD PLAN 2,340,000.00 2,340,000.00 VARIOUS ROAD PROJECTS 2,500,000.00 2,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONCRETING OF CORE ROAD (A CONCRETE ROAD OF 6" THICK X 4M WIDE X 1.5KMS - 835 BAROTAC NUEVO - - - 300,000.00 3,500,000.00 - - - - - - - - 8,700,000.00 12,500,000.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 CONSTRUCTION OF STEEL BRIDGE [ONE (1) PIER AND 30 MTRS STEEL BRIDGE, THREE (3) MTRS WIDE ] - INTEGRATED COMMUNITY FOOD PRODUCTION 4,390,000.00 4,390,000.00 CONSTRUCTION OF CORE ROADS (1000M, AVERAGE WEIGHT 5.0M) 4,310,000.00 4,310,000.00 836 BAROTAC VIEJO 6,500,000.00 - - - 5,500,000.00 - - - - 500,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 5,000,000.00 5,000,000.00 VEGETABLES PRODUCTION (ASSORTED VEGETABLES SEEDS WITH COMPLETE SETS OF VEGETABLE GARDEN TOOLS WERE PURCHASED) - RICE SEEDS PRODUCTION (ESTABLISHED 8 PARCEL OF RICE SEEDS PRODUCTION) - FEED PRODUCTION FOR POULTRY AND SWINE - SUSTAINABLE LIVELIHOOD PROJECTS (SMALL SCALE BUSINESS) - CONSTRUCTION OF FOOD PROCESSING PLANT FOR SWINE AND MEAT - FERTILIZER ASSISTANCE PROJECT(600 BAGS OF FERTILIZERS TO BE DISTRIBUTED TO 200 FARMERS) - SWINE PRODUCTION PROJECT - TILAPIA AND HITO CULTURE 500,000.00 500,000.00 PROVISION OF THRESHER (SEVEN UNITS OF THRESHER WITH MOTOR THAT WILL OPERATE IN 8 BARANGAYS) - PROVISION OF TEN (10) UNITS CORN SHELLER - PROVISION OF 14 UNITS HAND TRACTOR - 500 MODULES OF ARTIFICIAL REEF TO BE INSTALLED IN MARINE SANCTUARY 1,000,000.00 1,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT(SALINTUBIG)- EXPANSION OF POTABLE WATER SYSTEM INTO LEVER III 5,500,000.00 5,500,000.00 POPULATION AND PARENTAL AWARENESS TRAINING WORKSHOP 500,000.00 500,000.00 837 BATAD 4,000,000.00 - 500,000.00 1,500,000.00 3,500,000.00 - - - - 2,500,000.00 500,000.00 - - - 12,500,000.00 CONSTRUCTION/INSTALLATION OF POST HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYERS) 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 MARINE PROTECTED AREA MANAGEMENT AND DEVELOPMENT PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF ONE (1) UNIT TRADING POSTS 500,000.00 500,000.00 CONSTRUCTION / REPAIR AND IMPROVEMENT OF BINON-AN WHARF 1,000,000.00 1,000,000.00 MANGROVE REFORESTATION 500,000.00 500,000.00 UPGRADING OF SCHOOL FACILITIES AND FIXTURES 1,500,000.00 1,500,000.00 REHABILITATION / CONSTRUCTION OF WATER SYSTEM 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 1,500,000.00 1,500,000.00 CONSTRUCTION OF SEA WALL - PURCHASE OF ONE (1) UNIT 4X2 RESCUE VEHICLE WITH RESCUE EQUIPMENTS PURCHASED - REPAIR/REHABILITATION OF DAY CARE CENTERS 2,500,000.00 2,500,000.00 LOCAL ECONOMIC DEVELOPMENT PROGRAM 500,000.00 500,000.00 838 BINGAWAN - - - 170,000.00 - - - - - - - - - 12,330,000.00 12,500,000.00 GULAYAN SA PAARALAN 170,000.00 170,000.00 VARIOUS LGU PROJECTS 12,330,000.00 12,330,000.00 LIVELIHOOD (BITTER GOURD, SQUASH, EGGPLANT, NATIVE CHICKEN/BROILER) - CONCRETING OF 888 LN. M. CORE ROADS - 839 CABATUAN 4,700,000.00 - - 800,000.00 2,500,000.00 - 1,000,000.00 - - 3,500,000.00 - - - - 12,500,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 1,000,000.00 1,000,000.00 VARIOUS DA PROJECTS 2,200,000.00 2,200,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE (FOUR WHEEL TRACTOR) - POST HARVEST FACILITIES AND EQUIPMENT (FLATBED DRYER/MECHANCAL DRYER 1 UNIT FOR RICE & CORN WITH CAPACITY OF 120 SACKS - COLD STORAGE FACILITIES/VANS (ICE PLANT) - SUSTAINABLE AGRI-FISHERYBASED LIVELIHOOD & AGRI-FISHERY BUSINESS INVESTMENT (HITO & TILAPIA HATCHERY & PONDS) 1,000,000.00 1,000,000.00 AGRI-FISHERY TRAININGS 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION - GULAYAN SA PAARALAN 300,000.00 300,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAMS 500,000.00 500,000.00 FLOOD CONTROL (CONSTRUCTION OF CANALS/DRAINAGE TO ALL CREEKS AND RIVER BANKS IN SALACAY, BANGUIT & OTHER BRGYS ALONG TIGUM RIVER 2,500,000.00 2,500,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM (BHS &MHC) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICROENTERPRISE DEVELOPMENT TRACK) 500,000.00 500,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE (ESTABLISHMENT OF OPDA OFFICE/ACCESSIBILITY FACILITY FOR PWDS AND SCS 500,000.00 500,000.00 PROTECTVE SERVICES-INFRASTRUCTURE (CONSTRUCTION / UPGRADING OF DCC) 500,000.00 500,000.00 IMPROVEMENT OF EVACUATION CENTER WITH AMENITIES 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES (PROVISION OF ECCD LEARNING MATERIALS FOR ALL DCCA AND SUPERVISED NEIGHBORHOOD PLAYGROUPS FOR 59 DCC 500,000.00 500,000.00 840 CALINOG - - - - - - - - - 12,500,000.00 - - - - 12,500,000.00 VARIOUS KC PROJECTS 12,500,000.00 12,500,000.00 ETABLISHMENT OF 200 SQ.MTRS. CRISIS CENTER - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF 30 L.M. FLOOD CONTROL - 3KMS ROAD REHABILITATION (KC) - 3KMS ROAD REHABILITATION (KC) - CONSTRUCTION OF 100 L.M. HANGING FOOT BRIDGE - CONSTRUCTION OF 600 L.M. DRAINAGE CANAL (KC) - 841 CARLES 2,500,000.00 - - - - - - - - - - - - 16,000,000.00 18,500,000.00 GROUPER CULTURE IN NET CAGES 500,000.00 500,000.00 OYSTER CULTURE 500,000.00 500,000.00 PROVISION OF BANCA WITH FISHING GEARS AND NETS 500,000.00 500,000.00 NATIVE CHICKEN BACKYARD RAISING 1,000,000.00 1,000,000.00 CONCRETING OF CORE LOCAL ROAD 3,000,000.00 3,000,000.00 VARIOUS LGSF PROJECTS 6,500,000.00 6,500,000.00 CORE LOCAL ROAD CONSTRUCTION WITH FLOOD CONTROL 6,500,000.00 6,500,000.00 842 CONCEPCION 1,080,000.00 - - - - - - - - 8,420,000.00 2,100,000.00 - - 900,000.00 12,500,000.00 ACQUISITION OF RICE TRANSPLANTER 1,080,000.00 1,080,000.00 VARIOUS KC PROJECTS 8,420,000.00 8,420,000.00 CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES - REPAIR OF DAY CARE CENTERS - YAMAN-PINOY (ONE BARANGAY ONE PRODUCT) 2,100,000.00 2,100,000.00 INTEGRATED COMMUNITY-BASED FOOD PRODUCTION 900,000.00 900,000.00 843 DINGLE - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS ROAD PROJECTS 12,500,000.00 12,500,000.00 CONCRETING OF TAMBUNAC ROAD - CONCRETING OF CAMAMBUGAN ROAD - CONCRETING OF BRGY. ALEGRIA-GINALINAN ROAD - CONCRETING OF TANGHAWAN TO BONGLOY ROAD - CONCRETING OF SAN MATIAS ROAD - CONCRETING OF MATANGHARON ROAD - CONCRETING OF TULATULA-AN ROAD - CONCRETING OF NAZUNI ROAD, SITIO LALAS - CONCRETING OF POTOLAN ROAD - CONCRETING OF AGSALANAN ROAD - CONCRETING OF ILAJAS ROAD - 844 DUEAS - - - - 9,000,000.00 - - - - - - - - 3,500,000.00 12,500,000.00 CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES 6,000,000.00 6,000,000.00 REHABILITATION OF DRAINAGE SYSTEM 3,000,000.00 3,000,000.00 VARIOUS ROAD PROJECTS 3,500,000.00 3,500,000.00 CONCRETING OF LOCAL ROAD - CONCRETING OF LOCAL ROAD - CONCRETING OF LOCAL ROAD - CONCRETING OF LOCAL ROAD - CONCRETING OF LOCAL ROAD - CONCRETING OF LOCAL ROAD - 845 DUMANGAS 3,000,000.00 - - - 5,000,000.00 - - - - - - - - 4,500,000.00 12,500,000.00 CONSTRUCTION OF TRADING POST 3,000,000.00 3,000,000.00 VARIOUS DILG PROJECTS 5,000,000.00 5,000,000.00 CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES - PURCHASE OF DISASTER RESCUE EQUIPMENTS (TO BE USE BY MDRRMC IN TIMES OF DISASTER) - PURCHASE OF 4X4 MULTI-PURPOSE DISASTER VEHICLE - RIVER PROTECTION (RIP RAP) - INTEGRATED COMMUNITY-BASED FOOD PRODUCTION 1,500,000.00 1,500,000.00 CONSTRUCTION/MAINTENANCE/REHABILITATION OF CORE LOCAL ROADS 3,000,000.00 3,000,000.00 846 ESTANCIA 4,000,000.00 - - 110,000.00 2,640,000.00 - - - - 2,250,000.00 1,000,000.00 - - 2,500,000.00 12,500,000.00 IRRIGATION PROJECTS (SWIP) 20 HECTARES 1,000,000.00 1,000,000.00 LIVELIHOOD ASSISTANCE FOR FISHERFOLKS 2,000,000.00 2,000,000.00 POST-HARVEST FACILITIES AND EQUIPMENTS 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 110,000.00 110,000.00 VARIOUS DILG PROJECTS 2,640,000.00 2,640,000.00 ACQUISITION OF RESCUE VEHICLE (4X2 6 WHEELER TRUCK) - CONSTRUCTION OF 1 UNIT EVACUATION CENTER WITH AMENITIES - VARIOUS KC PROJECTS 2,250,000.00 2,250,000.00 CONSTRUCTION OF CRISIS CENTER - REPAIR OF DAMAGED DAY CARE CENTERS - YAMAN PINOY 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (DISPERSAL OF NATIVE CHICKEN, SWINE AND VEGETABLE SUBSIDY) 1,000,000.00 1,000,000.00 ACQUISITION OF ROAD-CLEARING (WHEELED) HEAVY EQUIPMENT 1,500,000.00 1,500,000.00 847 GUIMBAL 2,000,000.00 1,500,000.00 - - 5,500,000.00 - - - - 750,000.00 - - - 2,750,000.00 12,500,000.00 PURCHASE OF 1 UNIT MOTOR PUMP, PUMP HOSE AND 500M DISTRIBUTION CANAL 2,000,000.00 2,000,000.00 CONSTRUCTION OF 560MTRS BINANUA-AN IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF 280MTRS CAMANGAHAN IRRIGATION SYSTEM 500,000.00 500,000.00 VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF ONE UNIT HANGING BRIDGE - CANALIZATION PROJECT (400M WITH COVER) - CANALIZATION PROJECT (500M OPEN CANAL) - CANALIZATION PROJECT (500M OPEN CANAL) - REHABILITATION OF RIVERBANK PROTECTION OF OVERFLOW BRIDGE ( ONE (1) UNIT 30M SPURDIKE) - CONSTRUCTION OF RIVERBANK PROTECTION (ONE (1) UNIT 45M SPURDIKE) - CONSTRUCTION OF RIVERBANK PROTECTION (ONE (1) UNIT 45M SPURDIKE) 1,500,000.00 1,500,000.00 CONSTRUCTION OF 1 UNIT DAY CARE CENTER 750,000.00 750,000.00 CONCRETING OF IYASAN PROPER ROAD (100MTRS) 1,000,000.00 1,000,000.00 CONCRETING OF ROADS (100MTRS) 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONCRETING OF ROADS (75MTRS) 750,000.00 750,000.00 848 IGBARAS 1,575,000.00 2,500,000.00 - 230,000.00 - - 425,000.00 - - 4,520,000.00 - - - 3,250,000.00 12,500,000.00 CONSTRUCTION OF IRRIGATION PROJECTS 500,000.00 500,000.00 REHABILITIATION OF IRRIGATION PROJECTS 2,000,000.00 2,000,000.00 VARIOUS DA PROJECTS 1,575,000.00 1,575,000.00 ESTABLISHMENT OF TRADING POST - GREENHOUSES FOR VEGETABLE FARMING - CONSTRUCTION OF SOLAR DRYER - TECHNICAL CROP PRODUCTION TRAINING - ACQUISITION OF VARIOUS FARM TOOLS - GULAYAN SA PAARALAN 230,000.00 230,000.00 BASIC LIFE SUPPORT TRAINING FOR BHWAND MHO STAFF 200,000.00 200,000.00 BASIC OBSTERIC AND NEWBORN CARE TRAINING FOR MIDWIVES 225,000.00 225,000.00 CAPACITY BUILDING FOR VARIOUS SECTOR 520,000.00 520,000.00 CONSTRUCTION OF CRISIS CENTER WITH AMENITIES 2,500,000.00 2,500,000.00 REHABILITATION OF DAY CARE CENTER 750,000.00 750,000.00 REHABILITATION OF DAY CARE CENTER 750,000.00 750,000.00 CONCRETING OF LOCAL ROAD (270M X 5.0M CONCRETE ROAD PAVEMENT CONSTRUCTED 3,250,000.00 3,250,000.00 849 ILOILO CITY - - - 630,000.00 7,500,000.00 - - - - - 700,000.00 - 1,300,000.00 10,370,000.00 20,500,000.00 GULAYAN SA PAARALAN 630,000.00 630,000.00 VARIOUS DILG PROJECTS 7,500,000.00 7,500,000.00 CONSTRUCTION OF TWO (2) STOREY STANDARD EVACUATION CENTER WITH AMENITIES - YAMAN-PINOY 700,000.00 700,000.00 INTEGRATED COMMUNITY-BASED FOOD PRODUCTION 10,370,000.00 10,370,000.00 TECHNICAL VOCATION TRAINING/COMMUNITY BASED TRAINING 1,300,000.00 1,300,000.00 850 JANIUAY - - - - 6,720,000.00 - - - - 780,000.00 - - - 5,000,000.00 12,500,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 WATER BREAKER FOR FLOOD CONTROL (3KM BOTH SIDES OF SUAGUE RIVER) - CONSTRUCTION OF LEVEL II WATER SYSTEM 2,220,000.00 2,220,000.00 CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES - CONSTRUCTION OF 1 UNIT DAY CARE CENTER WITH AMENITIES 780,000.00 780,000.00 LIVELIHOOD PROJECT (NATIVE CHICKEN AND EGG PRODUCTION) 1,000,000.00 1,000,000.00 CONCRETING OF THE CORE ROADS 4,000,000.00 4,000,000.00 851 LAMBUNAO 2,000,000.00 - 1,000,000.00 3,000,000.00 - - - - - 2,000,000.00 500,000.00 1,500,000.00 - 2,500,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERYBASED LIVELIHOOD & AGRI-FISHERY BUSINESS INVESTMENT 2,000,000.00 2,000,000.00 CRITICAL HABITAT AREA ESTABLISHMENT/NATONAL GREENING PROGRAM (NGP) 1,000,000.00 1,000,000.00 REPAIR/REHABILITATION OF CLASSROOM AND PROVISION OF SCHOOL FURNITURE 1,500,000.00 1,500,000.00 REPAIR/REHABILITATION OF CLASSROOM AND PROVISION OF SCHOOL FURNITURE 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (FOR 200 4P'S BENEFICIARIES TO IMPROVE THEIR ENTREPRENEURIAL SKILLS AND HELP AUGMENT FAMILY INCOME 1,000,000.00 1,000,000.00 VARIOUS KC PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER WITH AMENITIES - REHABILITATION OF DAY CARE CENTER (CONCRETE 7X8 SQ. MTRS.) - REHABILITATION OF DAY CARE CENTER (CONCRETE 7X8 SQ. MTRS.) - YAMAN PINOY 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 2,500,000.00 2,500,000.00 CORE LOCAL ROAD CONSTRUCTION - CORE LOCAL ROAD CONSTRUCTION - CORE LOCAL ROAD CONSTRUCTION OF HANGING FOOT BRIDGE (80L.M. WITH CAPACITY MOVING LOADS OF 500 KGS) - ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,500,000.00 1,500,000.00 852 LEGANES 3,500,000.00 - 1,600,000.00 4,400,000.00 3,000,000.00 - - - - - - - - - 12,500,000.00 FARMERS COMMON SERVICE FACILITIES (TWO (2) MECHANICAL DRYERS) 1,500,000.00 1,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE 2,000,000.00 2,000,000.00 GREENING OF LEGANES - MANGROVE REHABILITATION PROGRAM AND DEVELOPMENT OF GUI-GUI CREEK 1,600,000.00 1,600,000.00 REHABILITATION/REPAIR OF SCHOOL BUILDINGS IN VARIOUS BARANGAYS 4,400,000.00 4,400,000.00 VARIOUS DILG PROJECTS 3,000,000.00 3,000,000.00 PURCHASE OF RESCUE BOAT AND 4X4 VEHICLE FOR DRRM - CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES - 853 LEMERY - - - - 5,583,480.00 - 512,400.00 - - 1,500,000.00 - - - 4,904,120.00 12,500,000.00 CONSTRUCTION OF 2.3 X 2.3 X 2.6M WATER TANK 500,000.00 500,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM 1,200,000.00 1,200,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM 800,000.00 800,000.00 STEEL FOOTBRIDGE (54 L.M.) 1,332,800.00 1,332,800.00 ONE (1) UNIT EVALUATION FACILITY WITH AMENITIES 1,750,680.00 1,750,680.00 HEALTH STATION FACILITIES AND ENHANCEMENT PROGRAM 512,400.00 512,400.00 ONE (1) UNIT TEMPORARY SHELTER 1,500,000.00 1,500,000.00 VARIOUS ROAD PROJECTS 2,155,720.00 2,155,720.00 CORE LOCAL ROAD CONCRETING OF 208 METERS WITH FMR W/ LINE DITCH CANAL - CORE LOCAL ROAD CONCRETING OF 208 METERS WITH FMR W/ LINE DITCH CANAL - VARIOUS ROAD PROJECTS 2,748,400.00 2,748,400.00 CORE LOCAL ROAD CONCRETING OF 208 METERS WITH FMR W/ LINE DITCH CANAL - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORE LOCAL ROAD CONCRETING OF 208 METERS WITH FMR W/ LINE DITCH CANAL - CORE LOCAL ROAD CONCRETING OF 208 METERS WITH FMR W/ LINE DITCH CANAL - 854 LEON 2,200,000.00 - - - 1,400,000.00 - 4,100,000.00 - - - 500,000.00 - - 4,300,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF ONE (1) UNIT IRRIGATION PROJECT - SMALL DIVERSION DAM (SDD) - CONSTRUCTION OF ONE (1) UNIT IRRIGATION PROJECT - SMALL DIVERSION DAM (SDD) - IRRIGGATION PROJECT - OPEN SURFACE PROJECT (OSP) PROCUREMENT OF MOTOR PUMP 500,000.00 500,000.00 PROCUREMENT OF FOUR (4) UNITS HAND TRACTORS - PROCUREMENT OF FIVE (5) UNITS RICE THRESHER - POST-HARVEST FACILITIES - CONSTRUCTION OF MULTI- PURPOSE DRYING PAVEMENT - POST-HARVEST FACILITIES - ESTABLISHMENT OF FLAT BED DRYER 700,000.00 700,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 1,400,000.00 1,400,000.00 COMPLETION OF BUCARI HEALTH STATION 1,000,000.00 1,000,000.00 COMPLETION/IMPROVEMENT OF DOROG HEALTH STATION 800,000.00 800,000.00 COMPLETION/IMPROVEMENT OF GINES HEALTH STATION 800,000.00 800,000.00 UPGRADING/IMPROVEMENT OF MUNICIPAL HEALTH CENTER 1,500,000.00 1,500,000.00 PRODUCT DEVELOPMENT AND TECHNOLOGY PROMOTION PROGRAM (LADAP) 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 4,300,000.00 4,300,000.00 CONCRETING OF AVANZADA-BAJE ROAD - CONCRETING OF LIGTOS-GINES ROAD - 855 MAASIN 500,000.00 - - - 1,200,000.00 - 500,000.00 - - 1,000,000.00 - - - 9,300,000.00 12,500,000.00 PRODUCTION OF ORGANIC FERTILIZER 500,000.00 500,000.00 CONSTRUCTION OF 30L.M. FOOT BRIDGE 1,200,000.00 1,200,000.00 UPGRADING OF HEALTH FACILITIES 500,000.00 500,000.00 LIVELIHOOD PROGRAM (BAMBO BY-PRODUCT) 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 9,300,000.00 9,300,000.00 REHABILITATION OF CORE LOCAL ROADS - 856 MIAGAO 2,000,000.00 - - 400,000.00 2,500,000.00 - - - - 1,000,000.00 500,000.00 - - 6,100,000.00 12,500,000.00 ESTABLISHMENT OF TRADING POSTS 2,000,000.00 2,000,000.00 GULAYAN SA PAARALAN 400,000.00 400,000.00 VARIOUS DILG PROJECT 2,500,000.00 2,500,000.00 CONSTRUCTION OF EVACUATION FACILITY WITH AMENITIES - REPAIR AND UPGRADING OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM (FOOD PROCESSING) 500,000.00 500,000.00 LIVELIHOOD PROGRAM (LIVESTOCK AND VEGETABLES) 2,100,000.00 2,100,000.00 CONCRETING OF ROADS 4,000,000.00 4,000,000.00 857 MINA - - - 2,000,000.00 7,500,000.00 - - 500,000.00 1,000,000.00 500,000.00 - - - 1,000,000.00 12,500,000.00 REHABILITATION OF E-LIBRARY & LEARNING RESOURCE CENTER 500,000.00 500,000.00 REHABILITATION OF E-LIBRARY & LEARNING RESOURCE CENTER 500,000.00 500,000.00 INNOVATIVE PROGRAM/ABOT-ALAM PROGRAM ALS-SPED- ENHANCEMENT OF EDUCATIONAL SERVICES FOR ALS-SPED 500,000.00 500,000.00 BASIC EDUCATION FACILITIES- PROVISION OF SCHOOL FURNITURES 500,000.00 500,000.00 REHAB OF WATER SUPPLY SYSTEM 5,000,000.00 5,000,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 FLOOD CONTROL-CONSTRUCTION OF COMPREHENSIVE DRAINAGE SYSTEM - EVACUATION FACILITIES-CONSTRUCTION OF 2 UNITS EVACUATION CENTER - EVACUATION FACILITIES-CONSTRUCTION OF 2 UNITS EVACUATION CENTER - INTEGRATED LIVELIHOOD PROGRAM:TUPAD 500,000.00 500,000.00 DEVELOPMENT PROGRAM- CONST. OF MUSEUM & PUBLIC LIBRARY 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SKILLS TRAINING, SEED CAPITAL PROVIDED AND SUSTAINABLE LIVELIHOOD ESTABLISHED FOR 100 BENEFICIARIES 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 1,000,000.00 858 NEWLUCENA 500,000.00 - - 500,000.00 4,480,000.00 - - - - 1,000,000.00 500,000.00 - - 5,520,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 INNOVATIVE PROGRAM/ABOT-ALAM PROGRAM (SUGA PROGRAM) 500,000.00 500,000.00 VARIOUS DILG PROJECTS 4,480,000.00 4,480,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM (SALINTUBIG) - FLOOD CONTROL (1KM BOX CULVERT) - CONSTRUCTION OF 2 UNITS DAY CARE CENTER WITH AMENITIES 1,000,000.00 1,000,000.00 YAMAN PINOY 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION MAINTENANCE/REHABILITATION CONCRETING OF ROADS 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION MAINTENANCE/REHABILITATION CONCRETING OF ROADS 5,020,000.00 5,020,000.00 859 OTON 2,000,000.00 - - - 1,750,000.00 - 2,000,000.00 - - 5,000,000.00 - - - 1,750,000.00 12,500,000.00 PURCHASE OF ONE(1) UNIT 4 WHEEL-DRIVE TRACTOR 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 1,750,000.00 1,750,000.00 CONSTRUCTION/REHABILITATION OF BREAK WATER - CONSTRUCTION OF ONE UNIT (1) NEWBRGY HEALTH STATION WITH AMENITIES 2,000,000.00 2,000,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER WITH AMENITIES 5,000,000.00 5,000,000.00 VARIOUS LGU PROJECTS 1,750,000.00 1,750,000.00 REPAIR AND MAINTENANCE OF TAGBAC SUR-LAMBUYAO IRRIGATION ROAD - REPAIR AND MAINTENANCE OF TAGBAC SUR-SANTA TERESITA MONICA IRRIGATION ROAD - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 860 PASSI CITY - - - 450,000.00 5,000,000.00 - - - - - - - - 7,050,000.00 12,500,000.00 GULAYAN SA PAARALAN 450,000.00 450,000.00 CONSTRUCTION OF TWO (2) UNITS STEEL BRIDGES 5,000,000.00 5,000,000.00 LIVELIHOOD PROJECT FOR 49 BARANGAYS 2,000,000.00 2,000,000.00 CONCRETING OF ACCESS ROAD/CORE LOCAL ROAD 5,050,000.00 5,050,000.00 861 PAVIA - - - 3,000,000.00 4,500,000.00 - 2,500,000.00 - - - 500,000.00 - - 2,000,000.00 12,500,000.00 BASIC EDUCATION FACILITIES - REPAIR/REHAB OF CLASSROOM & FURNITURES 3,000,000.00 3,000,000.00 PROVISION OF POTABLE WATER SUPLY (SALINTUBIG) 1,800,000.00 1,800,000.00 FLOOD CONTROL - CONSTRUCTION OF 1000L.M. CANAL AND DRAINAGE 2,200,000.00 2,200,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 CONSTRUCTION OF CABUGAO SUR BARANGAY HEALTH STATION WITH BIRTHING CENTER 2,500,000.00 2,500,000.00 YAMAN PINOY 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION (500 L.M. CONCRETE ROAD) 2,000,000.00 2,000,000.00 862 POTOTAN 2,800,000.00 - - 340,000.00 4,000,000.00 - - - - 2,340,000.00 520,000.00 - - 2,500,000.00 12,500,000.00 POST HARVEST FACILITIES (4-UNIT FLATBED MECHANICAL DRYER) 2,800,000.00 2,800,000.00 GULAYAN SA PAARALAN 340,000.00 340,000.00 CONSTRUCTION OF EVCUATION FACILITY WITH AMENITIES 4,000,000.00 4,000,000.00 CONSTRUCTION OF 3-UNIT DAY CARE CENTER WITH AMENITIES 2,340,000.00 2,340,000.00 LIVELIHOOD (LIVESTOCK-SWINE, CATTLE, DUCK AND CAT FISH) 520,000.00 520,000.00 VARIOUS LGU PROJECTS 2,500,000.00 2,500,000.00 LIVELIHOOD (LIVESTOCK-SWINE, CATTLE, DUCK AND CAT FISH) - 863 SAN DIONISIO 3,500,000.00 - - - 3,500,000.00 - 1,500,000.00 - - 2,000,000.00 2,000,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 3,500,000.00 3,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES (CONSTRUCTION OF GREENHOUSE) - AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES (MICRO-ENTERPRISING) - CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT - CONSTRUCTION OF 1KM FLOOD CONTROL FRM BRGY BAGACAY TO BRGY MANDU-AWAK 1,000,000.00 1,000,000.00 CONSTRUCTION OF TWO (2) UNITS STANDARD EVACUATION FACILITY WITH AMENITIES 2,000,000.00 2,000,000.00 PROCUREMENT OF RESCUE EQUIPMENTS FOR THE OPERATION OF THE EVACUATION CENTERS 500,000.00 500,000.00 REPAIR AND UPGRADING OF RHU AND 6 CACHMENT CENTERS WITH PROVISION OF BASIC EQUIPMENT AND INSTRUMENTS 1,500,000.00 1,500,000.00 REPAIR/UPGRADING OF 36 DAY CARE CENTERS 2,000,000.00 2,000,000.00 YAMAN PINOY 2,000,000.00 2,000,000.00 864 SAN ENRIQUE 2,500,000.00 - - 200,000.00 3,300,000.00 - 500,000.00 - 1,000,000.00 3,500,000.00 500,000.00 1,000,000.00 - - 12,500,000.00 PROCUREMENT OF THRESHER/TRACTORS FOR 23 FA'S IN THE MUNICIPALITY 1,500,000.00 1,500,000.00 PRODUCTION OF ORGANIC FERTILIZER THROUGH VERMI- COMPOSTING 500,000.00 500,000.00 CONSTRCUTION OF ONE (1) UNIT TRADING POST 500,000.00 500,000.00 GULAYAN SA PAARALAN (PUT UP VEGETABLE GARDEN IN 20 ELEMENTARY SCHOOL 200,000.00 200,000.00 PROVISION OF POTABLE WATER SUPPLY (SALINTUBIG) 500,000.00 500,000.00 VARIOUS DILG PROJECTS 2,800,000.00 2,800,000.00 ACQUISITION OF ONE (1) UNIT FIBER GLASS MOTOR BOAT - ACQUISITION OF ONE (1) UNIT RESCUE VEHICLE WITH EQUIPMENT FOR RESCUE/RELIEF PURPOSES - CONSTRUCTION OF ONE (1) UNIT EVACUATION CENTER - UPGRADING OF HEALTH FACILITIES AND EQUIPMENT 500,000.00 500,000.00 PRODUCTION OF BROCHURES AND COLLATERAL MATERIALS 1,000,000.00 1,000,000.00 ESTABLISMENT OF REGIONAL SHELTERED WORKSHOP AND AREA VOCATIONAL REHABILITATION CENTER 1,000,000.00 1,000,000.00 ESTABLISHMENT OF OPDA CENTER 1,000,000.00 1,000,000.00 ESTABLISHMENT OF TRIBAL OF INDEGINOUS PEOPLES 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-ASSISSTS OSY TO ACCESS EMPLOYMENT OPPORTUNITIES 500,000.00 500,000.00 STRATEGIC DEVELOPMENT PLANNING WORKSHOP FOR LGU EMPLOYEES 500,000.00 500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,000,000.00 1,000,000.00 865 SAN JOAQUIN 1,300,000.00 - 2,000,000.00 - - - 2,903,850.00 - - 3,396,150.00 2,900,000.00 - - - 12,500,000.00 IMPROVEMENT OF MARINE PROTECTED AREAS (MPA FACILITIES AND VISIBLE SIGNAGES AND MARKINGS) 1,300,000.00 1,300,000.00 FOREST REHABILITATION AND RE-PLANTING PROJECT 2,000,000.00 2,000,000.00 PROVISION OF MEDICAL EQUIPMENT 2,262,850.00 2,262,850.00 RURAL HEALTH MIDWIFE PLACEMENT (RHMP) PROGRAM 641,000.00 641,000.00 VARIOUS KC PROJECTS 1,950,000.00 1,950,000.00 ESTABLISHMENT OF REGIONAL SHELTERED WORKSHOP AND AREA VOCATIONAL REHABILITATION CENTER - PROSPECTIVE SERVICES INFRA PROJECT - 04 (PROVIDES SERVICES AND PROGRAMS OF PWD'S) - LENDING MICRO-ENTERPRISE (PROVISION OF FINANCIAL ASSISSTANCE TO 1000 POOR FAMILIES IN 22 BARANGAYS) 596,150.00 596,150.00 SUSTAINABLE LIVELIHOOD PROGRAM 850,000.00 850,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 2,900,000.00 2,900,000.00 866 SAN MIGUEL - - - - 4,500,000.00 - 1,500,000.00 - - - - - - 6,500,000.00 12,500,000.00 EXPANSION OF LEVEL III WATER SUPPLY 2,000,000.00 2,000,000.00 REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION AND STEEL BRIDGE 1,500,000.00 1,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROCUREMENT OF RESCUE VEHICLE (ONE (1) UNIT RESCUE VEHICLE THAT EQUIPPED WITH LIFE SUPPORT EQUIPMENT) 1,000,000.00 1,000,000.00 CONSTRUCTION OF STO. NINO NINO BRGY HEALTH STATION 1,500,000.00 1,500,000.00 VARIOUS LGU PROJECTS 6,500,000.00 6,500,000.00 IMPROVEMENT OF LOCAL CORE ROAD (TO PAVE EXISTING GRAVEL ROAD WITH CONCRETE GRAVEL ROAD PAVED WITH CONCRETE) - 867 SAN RAFAEL 3,450,000.00 - - - 4,500,000.00 - 2,050,000.00 - - 2,500,000.00 - - - - 12,500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 1,800,000.00 1,800,000.00 FARM IMPLEMENTS/TOOLS (TRACTORS FOR 11 REGISTERED FARMER'S COOP, WATER PUMP (PUMP MACHINE &ACCESSORIES) 1,650,000.00 1,650,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES - CONSTRUCTION OF BRGY HEALTH STATION TO PROVIDE CONTINUITY IN THE DELIVERY OF HEALTH SERVICES IN BRGY CALAIGANG 650,000.00 650,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION 1,400,000.00 1,400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM MICRO-ENTERPRISE DEVELOPMENT TRACK (ENHANCMENT/REPLENISHMENT OF SWINE DISPERSAL) 500,000.00 500,000.00 ACTIVE SERVICES-INFRASTRUCTURE PROJECTS (CONSTRUCTION OF DY CARE CENTERS) 2,000,000.00 2,000,000.00 868 SANTA BARBARA 3,250,000.00 - - - 500,000.00 - 2,250,000.00 - 1,000,000.00 2,000,000.00 - - - 3,500,000.00 12,500,000.00 IRRIGATION PROJECTS -SFR/SWIP 1,000,000.00 1,000,000.00 TRADING POST 750,000.00 750,000.00 ORGANIC FERTILIZER 500,000.00 500,000.00 AGRI-FISHERY LIVELIHOD (ENHANCED FOOD PRODUCTION) 500,000.00 500,000.00 INFRA SUPPORT TO AGRICULTURE (FARM IMPLEMENTS AND EQUIPMENT) 500,000.00 500,000.00 SALINTUBIG 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT (PROVIDING BETTER ACCESS TO HEALTH PROGRAMS AND FACILITIES PARTICULARLY TO INDIGENT PATIENTS 2,250,000.00 2,250,000.00 LOCAL TOURISM DEVELOPMENT (OLD TRAIN STATION RESTORATION) 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES (CICL, OSY, BATTERED WOMEN 500,000.00 500,000.00 SLP (CSO'S, WOMENS ASSOC., SC'S) 1,500,000.00 1,500,000.00 VARIOUS LGU PROJECTS 3,500,000.00 3,500,000.00 CORE LOCAL ROAD CONSTRUCTION (CONCRETING OF BARANGAY ROADS) - 869 SARA 8,500,000.00 - - - 4,000,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DA PROJECTS 7,780,000.00 7,780,000.00 SUPPORT TO AGRICULTURE (FARM IMPLEMENTS FOR FARMERS) - IRRIGATION PROJECT FOR RAIN FED AREAS (PROCUREMENT SHALLOWTUBE WELLS) 720,000.00 720,000.00 SPRING LEVEL 1 WATER SYSTEM (LEVEL 1 WATER SYSTEM) 1,000,000.00 1,000,000.00 REHABILITATION OF CANAL/MABANG SAPA CREEK (GROUTED RIP RAP OF WALLS OF CANAL/CREEK) 3,000,000.00 3,000,000.00 870 TIGBAUAN - - - - 8,000,000.00 - - - - 1,400,000.00 3,100,000.00 - - - 12,500,000.00 VARIOUS WATER PROJECTS 5,000,000.00 5,000,000.00 PROVISION OF POTABLE WATER SUPPLY (SALINTUBIG) - CONSTRUCTION OF RIVERBANK PROTECTION (170 L.M. OF GABION BASE STRUCTURE) 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 1,400,000.00 1,400,000.00 OTOP STORE EXPRESS/PASALUBONG CENTER 600,000.00 600,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM (70 M.V./ SMALL ENT. TRAINED AND GIVEN FINANCIAL SUPPORT) 1,000,000.00 1,000,000.00 LIVELIHOOD YAMANG PINOY (CONDUCT TRAINING, PRODUCT DEVELOPMENT & MARKETING) 1,500,000.00 1,500,000.00 871 TUBUNGAN 2,000,000.00 - - 2,000,000.00 1,000,000.00 - 2,000,000.00 500,000.00 - 1,500,000.00 - - - 3,500,000.00 12,500,000.00 VARIOUS DA PROJECTS 2,000,000.00 2,000,000.00 LIVELIHOOD PROGRAMS (LIVESTOCK PRODUCTION) - DISPERSED 48 HEADS SWINE, 15 HEADS CATTLE AND 10 HEADS GOAT - PROCUREMENT OF ONE (1) UNIT REFRIGERATED VAN - CONSTRUCTION/REHABILITATION OF IRRIGATION PROJECTS - ESTABLISHED ONE (1) UNIT PUMP IRRIGATION PROJECT AND CONSTRUCTED 10 UNITS SFR - ORGANIC AGRICULTURE PRODUCTION PROGRAM (CONSTRUCTION ONE (1) UNIT BIO-CONTROL LABORATORY - BASIC EDUCATION FACILITIES - REPAIR/REHAB OF CLASSROOM 2,000,000.00 2,000,000.00 PROCUREMENT OF RESCUE VEHICLE 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM - BRGY JOLASON & BRGY ADGAO BHS REPAIRED/REHABILITATED 2,000,000.00 2,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS - 80 BENEFICIARIES PROVIDED WITH SHORT TERM EMPLOYMENT 500,000.00 500,000.00 LIVELIHOOD PROGRAMS - 200 BENEFICIARIES PROVIDED WITH SOURE OF INCOME 1,000,000.00 1,000,000.00 SKILLS TRAINING - 100 BENEFICIARIES PROVIDED WITH SKILLS TRAINING 500,000.00 500,000.00 CORE LOCAL ROAD CONS / MAINTENANCE REHABILITATION - 180 L.M. ROAD CONCRETED 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONS / MAINTENANCE REHABILITATION - 135 L.M. ROAD CONCRETED 1,500,000.00 1,500,000.00 872 ZARRAGA 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 VARIOUS FISHERY PROJECTS 10,000,000.00 10,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS (PANTAT KIOSKS) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS (ORGANIC CHICKEN PRODUCTION) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS (ORGANIC PIG PRODUCTION) - ORGANIC FERTILIZER PRODUCTION 2,500,000.00 2,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS (LIVELIHOOD DEVELOPMENT/TECHJNOLOGY RESOURCE CENTER) - NEGROS OCCIDENTAL 129,570,933.00 1,600,000.00 10,195,367.00 33,213,822.00 113,368,000.00 - 56,553,824.00 11,230,000.00 4,060,000.00 114,945,267.00 19,375,187.00 7,900,000.00 8,225,000.00 37,072,600.00 547,310,000.00 873 BACOLOD CITY 11,500,000.00 - 2,000,000.00 3,280,000.00 - - 2,000,000.00 - - 16,520,000.00 1,400,000.00 - 1,800,000.00 - 38,500,000.00 VARIOUS DA PROJECTS 8,000,000.00 8,000,000.00 INFRA SUPPORT ON FISHERY PRODUCTON (MOTORIZED FISHING BOATS) - INFRA SUPPORT ON FISHERY PRODUCTON (FISH NETS/FISH GEAR) - AGRI-FISHERY (7 SMALL FISHERIES ASSOC) - GREENHOUSE FOR HIGH VALUE CROPS - SUSTAINABLE AGRI-FISHERY BUSINESS INVESTMENT 3,500,000.00 3,500,000.00 NATIONAL GREENING PROGRAM 2,000,000.00 2,000,000.00 ALTERNATIVE LEARNING SYSTEM 600,000.00 600,000.00 GULAYAN PROGRAM 680,000.00 680,000.00 REPAIR & REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 DEPLOYMENT TO NHTS-PR FAMILIES & REPRODUCTION OF MATERIALS 900,000.00 900,000.00 MATERIAL NEONETAL CHILDHEALTH & NUTRITION TRAINING 500,000.00 500,000.00 RABIES ELIMINATION 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SEED CAPITAL) 11,000,000.00 11,000,000.00 REPAIR & UPGRADING OF DAY CARE CENTERS 500,000.00 500,000.00 CONSTRUCTION OF 2 DAY CARE CENTERS 1,600,000.00 1,600,000.00 CONSTRUCTION OF 3RD PHASE YOUTH HOME 3,000,000.00 3,000,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS 420,000.00 420,000.00 YAMAN PINOY 1,400,000.00 1,400,000.00 TRAINING FOR WOMEN AND OUT OF SCHOOL YOUTH 1,800,000.00 1,800,000.00 874 BAGO CITY 5,500,000.00 - 1,500,000.00 - 6,000,000.00 - 1,500,000.00 2,000,000.00 - 3,500,000.00 - - 1,500,000.00 - 21,500,000.00 VARIOUS DA PROJECTS 5,500,000.00 5,500,000.00 PURCHASE OF MOTOR BOAT/MARINE ENGINE AND FISH NETS - ESTABLISHMENT OF PORT/WHARF - VERMI-COMPOSTING PRODUCTION AND PALAY SEEDS PRODUCTION - COMMUNITY SEED BANKING FOR UPLAND RICE FARMERS - NGP-MAINTENANCE AND PROTECTION OF EXISTING REFORESTATION PROJECTS IN BAGO CITY 1,500,000.00 1,500,000.00 CONSTRUCTION OF WATER SUPPLY, LEVEL III 1,000,000.00 1,000,000.00 CONSTRUCTION OF WATER SUPPLY, LEVEL III 1,000,000.00 1,000,000.00 CONSTRUCTION OF WATER SUPPLY, LEVEL III 1,000,000.00 1,000,000.00 CONSTRUCTION OF GENDER SENSITIVE EVACUATION CENTER 3,000,000.00 3,000,000.00 UPGRADING/RENOVATION OF HF ADAPTABLE TO CLIMATE CHANGE 1,500,000.00 1,500,000.00 DOLE-TUPAD 1,000,000.00 1,000,000.00 DOLE-INTEGRATED LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 SLP (MICRO ENTERPRISE DEVELOPMENT) 1,000,000.00 1,000,000.00 UPGRADING OF BAGO CITY CRISIS CENTER FOR WOMEN AND CHILDREN 2,000,000.00 2,000,000.00 CAPABILITY BUILDING FOR SOCIAL WORKERS, DAY CARE WORKERS AND SNP WORKERS 500,000.00 500,000.00 TECHNICAL-VOCATIONAL TRAININGS/COMMUNITY-BASED TRAINING 1,500,000.00 1,500,000.00 875 BINALBAGAN 1,000,000.00 - - - 5,000,000.00 - 2,000,000.00 - - 2,500,000.00 - - - 2,000,000.00 12,500,000.00 PROMOTION OF HIGH VALUE MARINE SPECIES PROJECT 500,000.00 500,000.00 FISH ENHANCEMENT AREA PROJECT 500,000.00 500,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES - FLOOD CONTROL PROJECT (RUBBLE CONCRETE LINED CANAL) - CAPACITY BUILDING FOR CSO 500,000.00 500,000.00 RENOVATION AND UPGRADING OF BHS AND PROCUREMENT OF BASIC EQUIPMENT AND INSTRUMENTS ON MATERNITY AND NEWBORN CARE 2,000,000.00 2,000,000.00 BASIC SECTOR SKILLS TRAINING 2,500,000.00 2,500,000.00 RURAL ROAD REHABILITATION PROJECT 2,000,000.00 2,000,000.00 876 CADIZ CITY 18,500,000.00 - - - - - - - - 8,000,000.00 - - - - 26,500,000.00 VARIOUS DA PROJECTS 18,000,000.00 18,000,000.00 PURCHASE OF DRILLING RIG WITH COMPLETE ACCESSORIES - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - SUSTAINABLE AGRI-FISHERY BASED AND OTHER AGRI-FISHERY BUSINESS INVESTMENT - CONSTRUCTION OF TRADING POST - MARINE PROTECTED AREA (MPA) 500,000.00 500,000.00 CONSTRUCTION OF 10 UNITS DAY CARE CENTER 8,000,000.00 8,000,000.00 877 CALATRAVA 4,000,000.00 - 500,000.00 1,800,000.00 - - 3,800,000.00 1,500,000.00 - 1,600,000.00 - - 800,000.00 - 14,000,000.00 CONSTRUCTION OF MUNICIPAL FARMERS BAGSAKAN CENTER 1,500,000.00 1,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PURCHASE OF PRE AND POST HARVEST FACILITY 1,500,000.00 1,500,000.00 IMPROVEMENT OF MUNICIPAL PORT 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM (ESTABLISHMENT OF NURSERY) 500,000.00 500,000.00 PROVISION OF MIMOSA AND EASE MODULES 1,000,000.00 1,000,000.00 REPAIR/IMPROVEMENT OF CLASSROOMS 800,000.00 800,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 1,200,000.00 1,200,000.00 CONSTRUCTION OF ONE (1) UNIT HEALTH STATION 1,200,000.00 1,200,000.00 CONSTRUCTION OF ONE (1) UNIT 2 CLASSROOM SCHOOL BUILDING 1,400,000.00 1,400,000.00 LIVELIHOOD DEVELOPMENT FOR FISHERFOLK 1,500,000.00 1,500,000.00 CONSTRUCTION OF TWO (2) DAY CARE CENTERS 1,600,000.00 1,600,000.00 SKILLS TRAINING ON PAINTING, WELDING AND OTHER IN DEMAND SKILLS 800,000.00 800,000.00 878 CANDONI 2,300,000.00 - - 3,500,000.00 2,500,000.00 - 1,000,000.00 - - 2,400,000.00 800,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 2,300,000.00 2,300,000.00 TRAININGS FOR AGRARIAN REFORM BENEFICIARIES ASSOCIATION - POST HARVEST FACILITIES (CONSTRUCTION OF MULTI- PURPOSE DRYING CONCRETE PAVEMENT) - ORGANIC FERTILIZER PRODUCTION: VERMI COMPOSTING PROJECT - TRADING POST- AUCTION MARKET WEIGHING SCALE - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD: MUNICIPAL FRESH WATER TILAPIA HATCHERY - GOAT RAISING PROJECT - REHABILITATION OF BAGONG LIPUNAN BUILDING OF CANDONI CENTRAL ELEMENTARY SCHOOL 500,000.00 500,000.00 EXPANSION OF GULAYAN SA PAARALAN 3,000,000.00 3,000,000.00 ESTABLISHMENT OF LEVEL II WATER SYSTEM 2,500,000.00 2,500,000.00 COMMUNITY HEALTH PROGRAM 1,000,000.00 1,000,000.00 POULTRY EGG PRODUCTION (LAYERS) 700,000.00 700,000.00 LIVELIHOOD, NATIVE CHICKEN RAISING 700,000.00 700,000.00 SKILLS TRAINING FOR EMPLOYMENT-WELDING 500,000.00 500,000.00 PROVISION OF SEED CAPITAL THROUGH SEA-K SCHEME 500,000.00 500,000.00 TUPAD, MOTORCYCLE RECAPPING 800,000.00 800,000.00 879 CAUAYAN 9,900,000.00 - - - 14,800,000.00 - - - - 3,500,000.00 2,500,000.00 - - 4,800,000.00 35,500,000.00 REHABILITATION OF HULAO HULAO SANCTUARY 2,000,000.00 2,000,000.00 CANAL LINING 600,000.00 600,000.00 CONSTRUCTION OF PUBLIC MARKET 4,300,000.00 4,300,000.00 CONSTRUCTION OF SLAUGHTER HOUSE 3,000,000.00 3,000,000.00 CONSTRUCTION OF TALACDAN WATER SYSTEM 3,000,000.00 3,000,000.00 EXPANSION OF BULATA WATER SYSTEM 1,000,000.00 1,000,000.00 SPRING DEVELOPMENT OF BUCLAO WATER SYSTEM 1,000,000.00 1,000,000.00 EXPANSION OF MASALING WATER SYSTEM 700,000.00 700,000.00 REHABILITATION OF ISIO WATER SYSTEM 1,000,000.00 1,000,000.00 ENHANCEMENT OF LUMBIA WATER SYSTEM 600,000.00 600,000.00 SPRING DEVELOPMENT WATER SYSTEM 700,000.00 700,000.00 ENHANCEMENT OF YAOYAO WATER SYSTEM 900,000.00 900,000.00 LINAON SPRING DEVELOPMENT 1,000,000.00 1,000,000.00 TOMINA SPRING DEVELOPMENT 1,000,000.00 1,000,000.00 TUYOM SPRING DEVELOPMENT 700,000.00 700,000.00 IMPROVEMENT OF MAN-ULING CANAL & DRAINAGE SYSTEM 900,000.00 900,000.00 CONCRETING OF CANAL 1,000,000.00 1,000,000.00 CONSTRUCTION OF CANAL LINING 600,000.00 600,000.00 SURA SPRING DEVELOPMENT 700,000.00 700,000.00 MERCHANDISING STORE FOR FISHING SUPPLIES 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (BUY & SELL, MICRO ENT.) FOR 11 WOMEN ASSOCIATION 500,000.00 500,000.00 MARKETING AND MERCHANDISING STORE 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD FOR PWD 500,000.00 500,000.00 LIVELIHOOD MICRO ENTERPRISE 500,000.00 500,000.00 MICRO FINANCE LIVELIHOOD 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (BUY AND SELL) WITH SARI- SARI STORE 1,000,000.00 1,000,000.00 MERCHANDISING (BUY AND SELL LOCAL PRODUCTS) 500,000.00 500,000.00 MACHINE SHOP WITH MERCHANDISING STORE 500,000.00 500,000.00 LIVELIHOOD (CARPENTRY EQUIPMENT) 500,000.00 500,000.00 CORE ROAD REHABILITATION 1,000,000.00 1,000,000.00 CORE ROAD REHABILITATION 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 2,800,000.00 2,800,000.00 CORE ROAD REHABILITATION - REHABILITATION OF INAYAWAN-CAMALANDA-AN CORE ROAD - TALIMAGAO ROAD REHABILITATION - MOLOBOLO CORE ROAD - 880 CITY OF ESCALANTE 4,272,500.00 - 1,047,500.00 - - - 4,300,000.00 500,000.00 660,000.00 2,920,000.00 - - 800,000.00 - 14,500,000.00 VARIOUS FISHERY PROJECTS 2,228,000.00 2,228,000.00 COASTAL RESOURCE MANAGEMENT PROGRAM - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 860,000.00 860,000.00 CONSTRUCTION OF ONE UNIT FLAT BED DRYER 1,184,500.00 1,184,500.00 REFORESTATION (UPLAND AND MANGROVE AREAS) 1,047,500.00 1,047,500.00 CONSTRUCTION OF 4 BIRTHING CENTERS 3,800,000.00 3,800,000.00 RABIES ELIMINATION 500,000.00 500,000.00 LIVELIHOOD ENHANCEMENT (KASAMA) 500,000.00 500,000.00 LOCAL TOURISM MARKETING AND PROMOTION 660,000.00 660,000.00 SUSTAINABLE LIVELIHOOD PROJECT FOR UKP/PYAP SLP 560,000.00 560,000.00 SUSTAINABLE LIVELIHOOD PROJECT FOR ESCALANTE CITY COUNCIL FOR WOMEN 560,000.00 560,000.00 COMPREHENSIVE JUVENILE INTERVENTION/REHABILITATION PROGRAM PACKAGE FOR CICL 600,000.00 600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROVISION OF EARLY CHILDHOOD CARE AND DEVELOPMENT LEARNING MATERIALS FOR DAY CARE CENTERS 600,000.00 600,000.00 CAPACITY BUILDING FOR CSWDO PERSONNEL 600,000.00 600,000.00 SKILLS TRAINING (PLUMBING, CELLPHONE AND GADGET REPAIR AND TILE SETTING) 800,000.00 800,000.00 881 CITY OF HIMAMAYLAN 7,600,000.00 - - - 4,800,000.00 - - - 2,400,000.00 1,600,000.00 - 2,400,000.00 - - 18,800,000.00 SUPPORT TO SUSTAINABLE FISHING PRACTICES AND FISH PROCESSING FOR MARGINAL FISHERFOLKS 2,400,000.00 2,400,000.00 VARIOUS DA PROJECTS 5,200,000.00 5,200,000.00 SUPPORT TO ABACA, COFFEE AND HIGH VALUE FRUIT TREES PRODUCTION - SWINE RAISING PROJECT - MEAT PROCESSING PROJECT - CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM LEVEL II(SALINTUBIG) 4,800,000.00 4,800,000.00 MANGROVE ECO-WALK AND WILDLIFE RESCUE CENTER 2,400,000.00 2,400,000.00 PROVISIONS OF SEED CAPITAL THRU SEA-K SCHEME AND CAPABILITY BUILDING SEMINARS 1,600,000.00 1,600,000.00 RURAL ELECTRIFICATION PROJECT 2,400,000.00 2,400,000.00 882 CITY OF KABANKALAN 8,800,000.00 - 1,200,000.00 1,000,000.00 800,000.00 - 6,000,000.00 2,000,000.00 - 8,500,000.00 1,700,000.00 - - - 30,000,000.00 VARIOUS DA PROJECTS 8,800,000.00 8,800,000.00 PEOPLE ORGANIZATION CAPABILITY BUILDING FOR FOOD PROCESSING AND LIVELIHOOD PROGRAM - STRENGTHENING SMALL FARM HOLDERS PRODUCTIVITY THROUGH INTEGRATED COMMUNITY FOOD PRODUCTION - EXPANSION OIL PALM FARMING FOR CROP DIVERSIFICATION INTEGRATED FARMING SYSTEM - NATIONAL GREENING PROGRAM (SITE DEVELOPMENT) 1,200,000.00 1,200,000.00 SUPPORT TO ALS (PROCUREMENT OF ADDITIONAL LEARNING MODULES) 1,000,000.00 1,000,000.00 PEOPLES ORGANIZATION CAPABILITY DEVELOPMENT ON GOOD GOVERNANCE AND ORGANIZATIONAL DEVELOPMENT AND MANAGEMENT - PHASE 2 800,000.00 800,000.00 COMMUNICABLE AND NON-COMMUNICABLE PREVENTION AND CONTROL PROGRAM 1,500,000.00 1,500,000.00 DENGUE PREVENTION AND CONTROL PROGRAM 500,000.00 500,000.00 RABIES PREVENTION AND CONTROL PROGRAM 900,000.00 900,000.00 STI-HIV/AIDS PREVENTION AND CONTROL PROGRAM 600,000.00 600,000.00 UPGRADING/REHABILITATION OF HEALTH FACILITIES 2,500,000.00 2,500,000.00 ALTERNATIVE MEDICINES/HERBAL MEDICINE (PRODUCTION OF GRANULES OR CAPSULES) 1,000,000.00 1,000,000.00 LIVELIHOOD SUPPORT PROGRAM FOR SOLO PARENTS AND DEPENDENTS OF KABANKALAN CITY INMATES 1,000,000.00 1,000,000.00 REHABILITATION AND UPGRADE OF CRISIS CENTER 1,000,000.00 1,000,000.00 REHABILITATION/UPGRADING OF FAMILY LIFE RESOURCE CENTER 2,000,000.00 2,000,000.00 CONSTRUCTION OF TWO-UNITS SATELLITE HEALTH CENTER 2,000,000.00 2,000,000.00 PWD ASSISTIVE DEVICES ASSEMBLY (CONSTRUCTION OF ASSEMBLY AREA AND WORK SHOP OF PWD ASSISTIVE DEVICES) 1,000,000.00 1,000,000.00 SKILLS TRAINING AND PURCHASE OF MATERIALS FOR ASSEMBLY OF PWD ASSISTIVE DEVICES 2,500,000.00 2,500,000.00 PEOPLES ORGANIZATION CAPABILITY BUILDING FOR FOOD PROCESSING AND LIVELIHOOD PROGRAM 1,700,000.00 1,700,000.00 883 CITY OF SIPALAY 6,200,000.00 - - 500,000.00 500,000.00 - 1,000,000.00 - - 7,200,000.00 2,200,000.00 - - - 17,600,000.00 VARIOUS DA PROJECTS 6,200,000.00 6,200,000.00 ORGANIC FARMING OF CORN PRODUCTION - MARKETING OF AGRICULTURAL/FISHING SUPPLIES - PROCUREMENT OF COLD STORAGE VAN - PROCUREMENT OF RICE THRESHER - REHABILITATION OF DAM, CANAL LINING, SOLAR DRYER AND WAREHOUSE - POULTRY AND DUCK RAISING - GULAYAN SA PAARALAN 500,000.00 500,000.00 POTABLE WATER SUPPLY FACILITY REPAIR 500,000.00 500,000.00 PROCUREMENT OF 10 ESSENTIAL DRUGS, LEPROSY DRUGS AND VITAMINS 500,000.00 500,000.00 PROCUREMENT OF RABIES VACCINE (RABIES VACCINE AVAILABLE AT CHO) 500,000.00 500,000.00 REPAIR/UPGRADING OF CRISIS CENTER 1,500,000.00 1,500,000.00 CONSTRUCTION OF OPDA 1,000,000.00 1,000,000.00 ESTABLISHMENT OF HOLDING CENTER FOR CICL 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (ROLLING STORE) FOR OSY/CL PARENTS 850,000.00 850,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (ROLLING STORE) FOR CHURCH-BASED ORGANIZATIONS 850,000.00 850,000.00 LIVELIHOOD SUPPORT PROGRAM FOR MALUBOG UPLAND SMALL FARMERS ASSOCIATION 500,000.00 500,000.00 PURCHASE OF FISHING BOATS AND FISH NETS 1,000,000.00 1,000,000.00 SKILLS AND ENHANCEMENT TRAINING, PROVISION OF MATERIALS AND SUPPORT FOR SEWING AND HANDICRAFT 1,500,000.00 1,500,000.00 LIVELIHOOD PROGRAM FOR 7 POS IN 12 BARANGAYS 700,000.00 700,000.00 884 ENRIQUE B. MAGALONA (SARAVIA) 2,766,191.00 - 962,867.00 2,464,064.00 - - 3,803,424.00 - - 1,750,667.00 490,187.00 - - 262,600.00 12,500,000.00 VARIOUS DA PROJECTS 2,766,191.00 2,766,191.00 MOTORIZED FISHING BOAT DISPERSAL - FISH NET DISPERSAL FOR 100 BENEFICIARIES - OYSTER CULTURE FOR 160 BENEFICIARIES - DISTRIBUTION OF FARM INPUTS (PALAY SEEDS & ORGANIC FERTILIZERS) - CONSTRUCTION OF MPDP AND COLLAPSIBLE DRYERS - CONSTRUCTION OF AGRICULTURAL PRODUCTS TRADING POST - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REHABILITATION AND MAINTENANCE OF THE NGP PROJECT (182 HAS. FROM GPBP 2014) 962,867.00 962,867.00 REPAIR/RENOVATION/REHABILITATION OF SCHOOL BUILDINGS 2,026,397.00 2,026,397.00 GULAYAN SA PAARALAN 437,667.00 437,667.00 CONSTRUCTION AND UPGRADING OF BHS 1,313,000.00 1,313,000.00 DENGUE CONTROL PROGRAM (TRAINING FOR CERTIFIED PEST APPLICATORS) 21,883.00 21,883.00 DEPLOYMENT OF COMPETENT MIDWIFE FOR BIRTHING FACILITY TO SERVE NHTS/INDIGENT FAMILIES 252,097.00 252,097.00 DEPLOYMENT OF REGISTERED NURSES WITH ENHANCE CLINICAL AND PREVENTIVE MANAGEMENT COMPETENCIES TO FAR FLUNG BARANGAYS WITH NHTS FAMILIES 315,120.00 315,120.00 ORIENTATION OF ANIMAL BITE CENTER STAFF ON REVISED GUIDELINES ON MANAGEMENT OF ANIMAL BITES 8,753.00 8,753.00 PREVENTION AND CONTROL OF HUMAN RABIES THROUGH PROVISION OF OST EXPOSURE PROPHYLAREGION XIZ 157,660.00 157,660.00 TRAINING ON MANAGEMENT OF ANIMAL BITE VICTIMS 21,883.00 21,883.00 UPGRADING OF HEALTH FACILITY IN TERMS OF EQUIPMENT AND INSTRUMENTS 1,713,028.00 1,713,028.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR PWD 437,667.00 437,667.00 CONSTRUCTION OF 1 DAY CARE CENTER 875,333.00 875,333.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS WITH COMPLETE SET OF SOAP AND FLOURIDE GEL TOOTHPASTE 437,667.00 437,667.00 HANDICRAFT SKILLS TRAINING 490,187.00 490,187.00 COMMUNITY FOOD PRODUCTION (SWINE DISPERSAL) 262,600.00 262,600.00 885 HINIGARAN 4,850,000.00 - - 500,000.00 3,600,000.00 - 2,000,000.00 - - 3,910,000.00 640,000.00 - - - 15,500,000.00 VARIOUS DA PROJECTS 4,850,000.00 4,850,000.00 ACQUISITION OF HAND TRACTOR - ACQUISITION OF RICE THRESHER - ACQUISITION OF STW - ORAGNIC FERTILIZER PRODUCTION - MARINE PROTECTED AND RESERVED AREA - TRADING POST (BAGSAKAN) - SWINE/GOAT RAISING - REPAIR/REHABILITATION OF ONE UNIT CLASSROOM 500,000.00 500,000.00 ESTABLISHMENT/CONSTRUCTION OF SLAUGHTERHOUSE 3,000,000.00 3,000,000.00 CAPABILITY BUILDING FOR FARMERS, FISHERS AND OTHER SECTOR ON CLIMATE CHANGE ADOPTATION AND DISASTER RISK REDUCTION 600,000.00 600,000.00 UPGRADING OF BARANGAY HEALTH STATION CONSULTATION AREA 1,600,000.00 1,600,000.00 UPGRADING OF RURAL HEALTH UNIT (CONSULTATION AREA AND WAITING AREA) 400,000.00 400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (EGG MACHINE) 560,000.00 560,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (BUY AND SELL OF VEGETABLES AND FRUITS) 650,000.00 650,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (BUT AND SELL OF FISH/FOOD VENDING) 1,200,000.00 1,200,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (PALAY TRADING) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (HOG FATTENING) 500,000.00 500,000.00 MICRO ENTERPRISE DEVELOPMENT 640,000.00 640,000.00 886 HINOBA-AN (ASIA) 5,900,000.00 - - - 9,500,000.00 - 1,100,000.00 - - 2,000,000.00 - - - - 18,500,000.00 VARIOUS DA PROJECTS 5,900,000.00 5,900,000.00 LIVESTOCK CONTRACT GROWING SCHEME - COMPREHENSIVE COMMUNITY ORGANIC AGRO-INDUSTRIAL PROJECT - MICRO-ENTERPRISE DEVELOPMENT (FISHERY, FARM IMPLEMENT) - ENHANCEMENT OF LEVEL III WATER SYSTEM 3,000,000.00 3,000,000.00 CONSTRUCTION OF FLOOD CONTROL PROJECT (350 L.M.) 3,500,000.00 3,500,000.00 PURCHASE OF ONE (1) UNIT BRANDNEWSADDAM TYPE RESCUE 1,500,000.00 1,500,000.00 DRAINAGE SYSTEM DEVELOPMENT (500 L.M.) 1,500,000.00 1,500,000.00 CONSTRUCTION OF ONE (1) UNIT BIRTHING FACILITY 1,100,000.00 1,100,000.00 CONSTRUCTION OF INTEGRATED TRANSPORT TERMINAL 2,000,000.00 2,000,000.00 887 ILOG 2,200,000.00 - - - 5,200,000.00 - 2,600,000.00 - - 1,000,000.00 - - - 1,500,000.00 12,500,000.00 DIVERSIFIED CLIMATE SMART FARMING 1,600,000.00 1,600,000.00 POST HARVEST FACILITIES (MULTI PURPOSE DRYING PAVEMENT) 600,000.00 600,000.00 VARIOUS DILG PROJECTS 5,200,000.00 5,200,000.00 PURCHASE OF RESCUE VEHICLE - CONSTRUCTION OF EVACUATION FACILITY WITH AMENITIES - DEEPENING OF RIVER/ CREEKS - CONSTRUCTION OF HALF-WAY HOUSE 1,000,000.00 1,000,000.00 CONSTRUCTION OF SATELLITE BHS 800,000.00 800,000.00 RENOVATION OF BHS 800,000.00 800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LOCAL ACCESS ROAD 1,500,000.00 1,500,000.00 888 ISABELA 2,250,000.00 - - - 2,250,000.00 - 2,800,000.00 - - - - - 2,800,000.00 2,400,000.00 12,500,000.00 VARIOUS DA PROJECTS 2,250,000.00 2,250,000.00 COMMUNITY-BASED ORGANIC FERTILIZER PRODUCTION PROJECT - FARM MECHANIZATION FACILITIES & EQUIPMENT PROJECT - REHABILITATION OF LEVEL III WATER SYSTEM 2,250,000.00 2,250,000.00 2 UNITS BARANGAY HEALTH STATIONS WITH COMPLIANT TO DOH STANDARD 1,300,000.00 1,300,000.00 SPACE IMPROVEMENT AND MAIN HEALTH CENTER COMPLIED WITH DOH STANDARD 1,500,000.00 1,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 400,000.00 400,000.00 CONSTRUCTION OF ACCESS ROAD (300M) 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROVISION OF SKILLS TRAINING PROGRAM FOR PANTAWID BENEFICIARIES, YOUTH, PWDS, SENIOR CITIZENS AND FARMERS 2,800,000.00 2,800,000.00 889 LA CARLOTA CITY - - - 500,000.00 5,000,000.00 - 1,000,000.00 - - 3,000,000.00 - - - 8,500,000.00 18,000,000.00 PROCUREMENT OF ARM CHAIRS 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER (WITH COMFORT ROOM FOR MEN, WOMEN AND PWDS) 4,000,000.00 4,000,000.00 CONSTRUCTION OF DRAINAGE SYSTEM (FLOOD CONTROL) 1,000,000.00 1,000,000.00 EXPANSION OF CURRENT BIRTHING CLINIC 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAMS (FOR MOTHERS AND WOMENS IN THE COMMUNITY) 500,000.00 500,000.00 CONSTRUCTION OF WOMENS AND CHILDRENS CRISIS CENTER 1,400,000.00 1,400,000.00 CONSTRUCTION OF DAY CARE CENTER 1,100,000.00 1,100,000.00 VARIOUS ROAD PROJECTS 3,000,000.00 3,000,000.00 CONCRETING OF LOCAL CORE ROADS 5,500,000.00 5,500,000.00 890 LA CASTELLANA - - - - 1,000,000.00 - 1,000,000.00 - - 4,000,000.00 - 2,000,000.00 - 4,500,000.00 12,500,000.00 IMPROVEMENT OF WATER SYSTEM 1,000,000.00 1,000,000.00 EQUIPPING THE MAIN HEALTH CENTER (PROCUREMENT OF MEDICAL EQUIPMENTS) 1,000,000.00 1,000,000.00 MICRO-ENTERPRISE DEVELOPMENT TRACK FOR 4PS AND YOUTH 1,000,000.00 1,000,000.00 CAPABILITY BUILDING OF SOCIAL WORKERS ALONG MANAGEMENT OF DIFFERENT CASES AND PROVISION OF ECCD LEARNING MATERIALS FOR DCC AND SUPERVISED NEIGHBORHOOD PLAYGROUPS 1,000,000.00 1,000,000.00 CONSTRUCTION OF IRRIGATION 2,000,000.00 2,000,000.00 VARIOUS ROAD PROJECTS 2,500,000.00 2,500,000.00 CORE LOCAL ROAD CONSTRUCTION - CONSTRUCTION OF SAND AND GRAVEL ROAD 2,000,000.00 2,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 2,000,000.00 2,000,000.00 891 MANAPLA 2,504,242.00 - - 2,161,758.00 1,000,000.00 - 4,484,000.00 - - 2,350,000.00 - - - - 12,500,000.00 FARM MACHINERIES AND EQUIPMENTS 1,004,242.00 1,004,242.00 ORGANIC AGRICULTURE PROGRAM 1,000,000.00 1,000,000.00 LIVELIHOOD ASSISTANCE 500,000.00 500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 1,356,358.00 1,356,358.00 PROVISION OF SCHOOL FACILITIES 502,900.00 502,900.00 GULAYAN SA PAARALAN PROJECT 120,000.00 120,000.00 ALS - ALTERNATIVE LEARNING SYSTEM 82,500.00 82,500.00 ALTERNATIVE DELIVERY MODE (ADM) 100,000.00 100,000.00 VARIOUS DILG PROJECTS 1,000,000.00 1,000,000.00 FLOOD CONTROL PROJECT - CONSTRUCTION OF SEA WALL - CONSTRUCTION OF ONE (1) EVACUATION CENTER WITH AMENITIES - DENGUE CONTROL PROGRAM 501,600.00 501,600.00 HEALTH EMERGENCY MANAGEMENT 580,000.00 580,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,400,000.00 2,400,000.00 MATERNAL NEONATAL CHILD HEALTH AND NUTRITION (MCHN) 500,000.00 500,000.00 TB CONTROL PROGRAM 502,400.00 502,400.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR 4PS BENEFICIARIES (SKILLS, TRAININGS AND PROCUREMENT OF LIVELIHOOD MATERIALS) 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTERS 750,000.00 750,000.00 REPAIR/REHABILITATION OF 4 DAY CARE CENTERS 1,100,000.00 1,100,000.00 892 MOISES PADILLA (MAGALLON) - - - - 10,500,000.00 - - - - 1,000,000.00 1,000,000.00 - - - 12,500,000.00 VARIOUS WATER PROJECTS 7,500,000.00 7,500,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM - CONSTRUCTION OF LEVEL II WATER SYSTEM - IMPROVEMENT OF DRAINAGE SYSTEM (2KMS BLIND & GROUTED OPEN CANAL) 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (200 HH'S PROVIDED WITH SEED CAPITAL) 1,000,000.00 1,000,000.00 YAMAN PINOY (FOOD PROCESSING) 500,000.00 500,000.00 MICRO-ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 893 MURCIA - - - 600,000.00 2,000,000.00 - 1,500,000.00 - - 4,775,000.00 1,625,000.00 2,000,000.00 - - 12,500,000.00 BASCI EDUCATION FACILITIES (REPAIR OF CLASSROOMS) 600,000.00 600,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (PROVISION OF POTABLE WATER - KC) 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (CONSTRUCTION OF BRGY. HEALTH STATION) 1,500,000.00 1,500,000.00 VARIOUS KC PROJECTS 3,775,000.00 3,775,000.00 KAPIT-BISIG LABAN SA KAHIRAPAN-COMPREHENSIVE AND INTEGRATED DELIVERY OF SOCIAL SERVICES (KALAHI-CIDDS) PROJECT - LIVELIHOOD PROGRAM FOR 465 PANTAWID PAMILYA BENEFICIARIES - KAPIT-BISIG LABAN SA KAHIRAPAN-COMPREHENSIVE AND INTEGRATED DELIVERY OF SOCIAL SERVICES (KALAHI-CIDDS) PROJECT - CONSTRUCTION OF COMPREHENSIVE DRAINAGE SYSTEM (KC) - KAPIT-BISIG LABAN SA KAHIRAPAN-COMPREHENSIVE AND INTEGRATED DELIVERY OF SOCIAL SERVICES (KALAHI-CIDDS) PROJECT - CONSTRUCTION OF SPILLWAY (KC) - PROTECTIVE SERVICES (CONSTRUCTION OF DROP IN CENTER FOR CICL) 1,000,000.00 1,000,000.00 YAMANG PINOY SUSTAINABLE LIVELIHOOD PROJECT 750,000.00 750,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM (LIVELIHOOD PROGRAM) 875,000.00 875,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 2,000,000.00 2,000,000.00 894 PONTEVEDRA - 500,000.00 - 730,000.00 2,785,000.00 - - 850,000.00 - 7,290,000.00 255,000.00 - - - 12,410,000.00 RICE IRRIGATION PROJECT 500,000.00 500,000.00 GULAYAN SA PAARALAN 230,000.00 230,000.00 ENHANCEMENT OF SKILLS OF OSY YOUTH 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY SYSTEM (LEVEL 1) 525,000.00 525,000.00 PROVISION OF POTABLE WATER SUPPLY SYSTEM (LEVEL 1) 560,000.00 560,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF RIVERBANK PROTECTION TO PREVENT FLOODING 850,000.00 850,000.00 CONSTRUCTION OF RIVERBANK PROTECTION TO PREVENT FLOODING 850,000.00 850,000.00 LIVELIHOOD OPPORTUNITIES FOR THE PTA FEDERATION MEMBERS 850,000.00 850,000.00 VARIOUS SUSTAINABLE LIVELIHOOD PROJECTS 2,730,000.00 2,730,000.00 MICRO ENTERPRISE FOR SENIOR CITIZENS 650,000.00 650,000.00 ESTABLISHMENT OF TRICYCLE PARTS STORE 600,000.00 600,000.00 VARIOUS KC PROJECTS 3,310,000.00 3,310,000.00 CONSTRUCTION OF CICL CENTER - CONSTRUCTION OF STANDARD EVACUATION CENTER WITH AMENITIES - CONSTRUCTION OF OPDA (NOWPDAO) - CONSTRUCTION OF PASALUBONG CENTER - INCLUSION IN THE YAMAN PINOY PROGRAM 255,000.00 255,000.00 895 PULUPANDAN 3,500,000.00 - - 2,750,000.00 1,500,000.00 - - - - 3,250,000.00 1,500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 3,500,000.00 3,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (THRESHER, MOTORIZED BOATS AND FISH NETS) - PURCHASE OF IODIZING MACHINE - PURCHASE OF MECHANICAL DRYERS - ORGANIC FERTILIZER PRODUCTION - REPAIR/REHABILITATION OF CLASSROOMS 2,250,000.00 2,250,000.00 PROVISION OF SCHOOL FURNITURES (ADDITIONAL SEATS) 500,000.00 500,000.00 CONSTRUCTION OF FOOTBRIDGE AT PATIC-UTOD BRIDGE 1,500,000.00 1,500,000.00 ESTABLISHMENT/CONSTRUCTION OF INFRASTRUCTURE - WOMEN CRISIS CENTER 750,000.00 750,000.00 CONSTRUCTION OF EVACUATION CENTER WITH AMENITIES 2,500,000.00 2,500,000.00 OTOP-ESTABLISHMENT OF STORE EXPRESS 1,500,000.00 1,500,000.00 896 SAGAY CITY 4,700,000.00 - - 4,200,000.00 6,500,000.00 - 5,000,000.00 500,000.00 - 1,700,000.00 2,375,000.00 - 525,000.00 - 25,500,000.00 VARIOUS DA PROJECTS 4,700,000.00 4,700,000.00 LIVELIHOOD ASSISTANCE PROGRAM FOR SMALL LIVESTOCK FARMERS - FLOATING CAGE AND GROUPER CULTURE FOR MARGINAL FISHERFOLKS - GRAVID CRAB CULTURE - ESTABLISHMENT OF WATCH TOWER/LIGHTHOUSE - INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 3,500,000.00 3,500,000.00 GULAYAN SA PAARALAN 700,000.00 700,000.00 POTABLE WATER SYSTEM CONSTRUCTION 3,500,000.00 3,500,000.00 FLOOD CONTROL PROJECT (CONSTRUCTION OF MAIN SEWER) 3,000,000.00 3,000,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 1,600,000.00 1,600,000.00 CONSTRUCTION OF FOUR (4) UNITS BARANGAY HEALTH SUB- STATIONS 3,400,000.00 3,400,000.00 TUPAD PROGRAM FOR WOULD-BE OFWS 500,000.00 500,000.00 PURCHASE OF 25 UNITS PHOTOCOPIER AS SUSTAINABLE LIVELIHOOD PROGRAM FOR PWDS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR WOMEN 700,000.00 700,000.00 SHELL CRAFT MAKING ENHANCEMENT TRAINING AND LIVELIHOOD SUPPORT 375,000.00 375,000.00 GROCERY STORE WITH ACCESSORIES AND MANAGEMENT TRAINING FOR SENIOR CITIZENS 2,000,000.00 2,000,000.00 COMMUNITY BASED TRAINING FOR SMAWNC1 AND NC2 525,000.00 525,000.00 897 SALVADOR BENEDICTO 2,300,000.00 - 700,000.00 1,398,000.00 2,100,000.00 - 552,000.00 - - 3,950,000.00 - 1,500,000.00 - - 12,500,000.00 VARIOUS DA PROJECTS 2,300,000.00 2,300,000.00 CONSTRUCTION OF TRADING POST - COMMUNITY BASED ORGANIC FERTILIZER PRODUCTION - ESTABLISHMENT OF RIVER BANK TREE PLANTATION 700,000.00 700,000.00 REPAIR OF CLASSROOMS AND PROVISION OF ARM CHAIRS 1,398,000.00 1,398,000.00 CONSTRUCTION OF LEVEL 1 WATER SUPPLY SYSTEM 1,000,000.00 1,000,000.00 PURCHASE OF RESCUE VEHICLE - ONE (1) UNIT DUMP TRUCK 1,100,000.00 1,100,000.00 ADDITIONAL RN HEALS AND RHMPP 552,000.00 552,000.00 CONSTRUCTION OF DAY CARE CENTER WITH COMPLETE LEARNING AND HANDWASHING FACILITY 750,000.00 750,000.00 CONSTRUCTION OF BAHAY PAGASA FOR CICL 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - TRAINING & CAPITAL ASSISTANCE 2,500,000.00 2,500,000.00 BARANGAY LINE ENHANCEMENT PROGRAM 1,500,000.00 1,500,000.00 898 SAN CARLOS CITY 3,400,000.00 - - 6,000,000.00 2,600,000.00 - 3,000,000.00 1,500,000.00 1,000,000.00 4,500,000.00 - - - 6,000,000.00 28,000,000.00 VARIOUS DA PROJECTS 3,400,000.00 3,400,000.00 FIBER GLASS BOAT MAKING - SPRING DEVELOPMENT PROJECT IN SITIO TANGAYAN - CATTLE DISPERSAL - 75 HEADS - ORGANIC PRODUCT PROMOTION AND DEVELOPMENT - CORN/CASSAVA DEVELOPMENT PROGRAM - RICE PRODUCTION PROJECT - CONSTRUCTION & ESTABLISHMENT OF ARTIFICIAL REEF (JACKSTONE TYPE) - FARM IMPLEMENT FOR MARGINAL FARMER - FISHING GEARS AND EQUIPMENT - OPEN HIGH SCHOOL PROGRAM 500,000.00 500,000.00 REPRODUCTION OF MODIFIED IN SCHOOL OFF SCHOOL APPROACH (MISOSA) 500,000.00 500,000.00 PROVISION OF REPAIR ALLOCATION FOR SCHOOLS 5,000,000.00 5,000,000.00 INSTALLATION OF A SURFACE WATER TREATMENT SYSTEM INTEGRATING TO THE URBAN LEVEL III WATER NETWORK 2,600,000.00 2,600,000.00 RENOVATION AND UPGRADING OF 2 BHS TO PHIC STANDARD 3,000,000.00 3,000,000.00 STARTER KIT TOOLS FOR SKILLED WORKERS 500,000.00 500,000.00 OFWINTEGRATION PROGRAM 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS EMERGENCY EMPLOYMENT (UNEMPLOYED AND WAGE SALARY EARNER WERE PROVIDED WITH SHORT TERM EMPLOMENT) 500,000.00 500,000.00 ESTABLISHMENT OF MANGROVE ECO-PARK 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTER WITH AMENITIES (ILIRANAN) 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTER WITH AMENITIES 1,000,000.00 1,000,000.00 CONSTRUCTION OF DAY CARE CENTER WITH AMENITIES (INITIHAN) 1,000,000.00 1,000,000.00 REPAIR/UPGRADING OF HAGONOY DAY CARE CENTER 500,000.00 500,000.00 REPAIR/UPGRADING OF WOMEN CRISIS CENTER 500,000.00 500,000.00 PROVISION OF SEED CAPITAL TO SET 4PS THROUGH SEA-K SCHEME 500,000.00 500,000.00 CONCRETING OF CODCOD TO CABAGTASAN ROAD 2,000,000.00 2,000,000.00 CONCRETING OF LUPAO TO LAGHA ROAD 2,000,000.00 2,000,000.00 CONCRETING OF QUEZON TO BALABAG ROAD 2,000,000.00 2,000,000.00 899 SAN ENRIQUE 6,500,000.00 - - 120,000.00 3,500,000.00 - - 2,380,000.00 - - - - - - 12,500,000.00 VARIOUS DA PROJECTS 6,500,000.00 6,500,000.00 CONSTRUCTION OF PUBLIC MARKET - GULAYAN SA PAARALAN 120,000.00 120,000.00 CONSTRUCTION OF FLOOD CONTROL 2,000,000.00 2,000,000.00 PURCHASE OF 1 UNIT RESCUE VEHICLE (ONE (1) UNIT DISASTER RESPONSE VEHICLE) 1,500,000.00 1,500,000.00 LIVELIHOOD PROGRAM FOR VARIOUS SECTORS 2,380,000.00 2,380,000.00 900 SILAY CITY 2,848,000.00 - 1,785,000.00 - 2,320,000.00 - 1,191,400.00 - - 3,855,600.00 500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 2,848,000.00 2,848,000.00 AGRI-FISHERIES TRAININGS - ORGANIC FERTILIZER PRODUCTION CUM SHREDDER MACHINE VERMIN COMPOSTING - INFRA SUPPORT TO AGRI-FISHERY PRODUCTION - POST-HARVEST FACILITIES (MECHANICAL DRYER, TRACTOR, MULTI-PURPOSE DRYING PAVEMENT) - NATIONAL GREENING PROGRAM (REFORESTATION (MANGROVE/UPLAND), RIVER/CREEK REHABILITATION AND SEED PRODUCTION) 1,785,000.00 1,785,000.00 PURCHASE OF RESCUE EQUIPMENTS (FLAT BOTTOM BOAT, LIFTING BAGS, PORTABLE LIGHTING SYSTEM, CHAIN SAWS, SAFETY STRUTS) 1,820,000.00 1,820,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (DROPPLERS, BP APPARATUS, WEIGHING SCALES AND STETHOSCOPE) 595,700.00 595,700.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION 595,700.00 595,700.00 CONSTRUCTION OF CRISIS CENTER 2,142,000.00 2,142,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SKILLS TRAINING - HERBAL MEDS, CANDLE MAKING, FOOD PRESERVATION REFLEXOLOGY, PURCHASE OF TRISIKAD AND FISHNETS) 1,713,600.00 1,713,600.00 RURAL MICRO ENTERPRISES DEVELOPMENT PROGRAM 500,000.00 500,000.00 901 TALISAY 700,000.00 1,100,000.00 500,000.00 - 1,150,000.00 - 3,000,000.00 - - 2,800,000.00 1,500,000.00 - - 1,750,000.00 12,500,000.00 EXPANSION OF CAGANG AND IMBANG COMMUNITY IRRIGATION PROJECT 1,100,000.00 1,100,000.00 PROVISION OF AGRICULTURAL FACILITIES/FARM TOOL IMPLEMENTS 700,000.00 700,000.00 TALISAY GREENING PROGRAM 500,000.00 500,000.00 VARIOUS DILG PROJECTS 1,150,000.00 1,150,000.00 REPAIR AND MAINTENANCE OF URBAN DRAINAGE SYSTEM - PURCHASE OF RESCUE VEHICLE AND EQUIPMENT FOR A RESPONSIVE DRRM - UPGRADING OF HEALTH SERVICES AND FACILITIES (PROVISION OF EQUIPMENTS TO 3 BHS) 3,000,000.00 3,000,000.00 CONSTRUCTION OF CONCRETE DISASTER-RESILIENT DCC WITH HANDWASHING AREA 700,000.00 700,000.00 ASSISTIVE DEVICES FOR PWDS AND SENIOR CITIZENS 500,000.00 500,000.00 CONSTRUCTION OF SENIOR CITIZENS PHARMACY AND PROCUREMENT OF FACILITIES/MEDICINES 1,100,000.00 1,100,000.00 SUSTAINABLE LIVELIHOOD PROGRAMS FOR 4PS BENEFICIARIES AND OTHER DISADVANTAGED SECTOR 500,000.00 500,000.00 SUPPORT TO DEVELOPMENT OF BAMBOO INDUSTRY 500,000.00 500,000.00 PALANGABUHIAN PARA SA KOOPERATIBA WITH 2015 500,000.00 500,000.00 BPLS STREAMLINING AND INVESTMENT PROMOTION PROGRAM 500,000.00 500,000.00 ROAD BASE CORRECTION AND LEVELING 1,000,000.00 1,000,000.00 ROAD CONCRETING 750,000.00 750,000.00 902 TOBOSO 4,520,000.00 - - 820,000.00 4,165,000.00 - 855,000.00 - - 1,280,000.00 - - - 860,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION 515,000.00 515,000.00 VARIOUS DA PROJECTS 4,005,000.00 4,005,000.00 CONSTRUCTION OF TRADING CENTER - CONSTRUCTION OF TRADING CENTER - CONSTRUCTION OF TRADING CENTER - SUSTAINABLE AGRICULTURE BASED LIVELIHOOD PROJECT - COMMUNITY SEED BANKING PROJECT - REPAIR OF THREE UNITS CLASSROOM BUILDINGS OF THE THREE ELEMENTARY SCHOOLS OF TOBOSO DISTRICTS 640,000.00 640,000.00 GULAYAN SA PAARALAN PROJECT 180,000.00 180,000.00 EXPANSION/ IMPROVEMENT OF BARANGAY SALAMANCA WATER SYSTEM, LEVEL III 855,000.00 855,000.00 IMPROVEMENT OF POTABLE WATER SYSTEM 750,000.00 750,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM, PHASE I 1,700,000.00 1,700,000.00 PROVISION OF POTABLE WATER SYSTEM 430,000.00 430,000.00 SPRING DEVELOPMENT PROJECT 430,000.00 430,000.00 RHU EQUIPPING (PCB/OPB 1 PACKAGE WITH LABORATORY AND DENTAL SERVICES) THROUGH HFEP 855,000.00 855,000.00 CONSTRUCTION OF DAY CARE CENTERS 1,280,000.00 1,280,000.00 CORE LOCAL ROAD CONSTRUCTION 860,000.00 860,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 903 VALLADOLID 1,060,000.00 - - 890,000.00 7,298,000.00 - 1,068,000.00 - - 1,294,000.00 890,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,060,000.00 1,060,000.00 FARM FACILITIES AND INPUTS - CRAB GILL NET DISPERSAL - GILL NET DISPERSAL - PURCHASE OF 48 UNITS MOTOR ENGINE - IRRIGATION FACILITIES AND ORGANIC FERTILIZER PRODUCTION - IMPROVEMENT OF SCHOOL FACILITIES (ABOT-TALINO PROJECT) 890,000.00 890,000.00 SALINTUBIG PROVISION OF POTABLE WATER SUPPLY (LEVEL III WATER SYSTEM) 6,230,000.00 6,230,000.00 PROCUREMENT OF RESCUE FACILITIES 445,000.00 445,000.00 ACQUISITION OF RESCUE VEHICLE 623,000.00 623,000.00 HEALTH FACILITY ENHANCEMENT (4 BHS) 1,068,000.00 1,068,000.00 CONSTRUCTION OF ONE UNIT DAY CARE CENTER 445,000.00 445,000.00 CONSTRUCTION OF WOMENS AND CHILDRENS CRISIS CENTER 445,000.00 445,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICRO-ENTERPRISE DEVELOPMENT TRACK) 404,000.00 404,000.00 OTOP STORE EXPRESS/PASALUBONG CENTER 890,000.00 890,000.00 904 VICTORIAS CITY - - - - 5,000,000.00 - - - - 3,000,000.00 - - - 4,500,000.00 12,500,000.00 CONSTRUCTION OF FLOOD CONTROL PROJECT 5,000,000.00 5,000,000.00 SUPPLEMENTARY FEEDING PROGRAM FOR CHILDREN ATTENDING SUPERVISED NEIGHBORHOOD PLAY 2,000,000.00 2,000,000.00 REPAIR AND UPGRADING OF DAYCARE CENTERS 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 4,500,000.00 4,500,000.00 IMPROVEMENT OF LINK ROADS - REGION VII 419,107,248.86 27,404,917.55 22,465,000.00 102,775,898.14 606,774,227.65 2,000,000.00 122,682,227.55 34,760,144.00 38,968,457.56 193,961,738.48 14,863,750.00 9,111,000.00 22,764,000.00 278,736,557.26 1,896,375,167.05 BOHOL PROVINCE 153,728,981.45 8,384,917.55 2,356,500.00 31,572,000.00 244,472,471.65 - 19,905,000.00 5,550,000.00 13,746,257.56 49,939,571.43 3,300,000.00 - 7,864,000.00 72,203,300.41 613,023,000.05 905 ALBURQUERQUE 1,000,000.00 - - 550,000.00 9,100,000.00 - - - - 1,350,000.00 - - - - 12,000,000.00 LIVELIHOOD ENHANCEMENT THROUGH DUCK RAISING 500,000.00 500,000.00 AGRO-PROCESSING FACILITY - COCO SUGAR PRODUCTION 500,000.00 500,000.00 REPAIR /REHABILITATION OF SCHOOL CLASSROOMS/BUILDINGS 550,000.00 550,000.00 RESCUE EQUIPMENT 1,100,000.00 1,100,000.00 VARIOUS WATER PROJECTS 8,000,000.00 8,000,000.00 IMPROVEMENT OF MUNICIPAL WATERWORKS SYSTEM - PURCHASE OF MACHINERIES &EQUIPMENT FOR MICRO ENTERPRISE DEVELOPMENT 850,000.00 850,000.00 SUSTAINABLE LIVELIHOOD PROJECT (WASTE RECYCLING) 500,000.00 500,000.00 906 ALICIA 2,000,000.00 - - 2,000,000.00 4,500,000.00 - - - 1,000,000.00 - - - 1,500,000.00 1,500,000.00 12,500,000.00 IRRIGATION PROJECT 2,000,000.00 2,000,000.00 REPAIR OF CLASSROOMS 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 FLOOD CONTROL - IMPROVEMENT OF EVACUATION FACILITY - PROVISION OF POTABLE WATER SUPPLY(SALINTUBIG) 2,000,000.00 2,000,000.00 CONSTRUCTION OF TOURISM INFORMATION CENTER 1,000,000.00 1,000,000.00 PROJECT TO BE IDENTIFIED 1,500,000.00 1,500,000.00 TECHNICAL VOCATION TRAINING/COMMUNITY-BASED TRAINING 1,500,000.00 1,500,000.00 907 ANDA - - - 2,500,000.00 2,500,000.00 - - - 1,746,257.56 3,500,000.00 - - - 2,253,742.44 12,500,000.00 REPAIR OF CLASSROOMS 2,500,000.00 2,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY 2,500,000.00 2,500,000.00 CONSTRUCTION OF ANDA TOURISM INFORMATION CENTER 1,746,257.56 1,746,257.56 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT 3,500,000.00 3,500,000.00 VARIOUS ROAD PROJECTS 2,253,742.44 2,253,742.44 CORE LOCAL ROAD CONSTRUCTION - 908 ANTEQUERA 3,500,000.00 - - - 9,000,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,500,000.00 3,500,000.00 AGRICULTURE AND LIVELIHOOD PROGRAM - REHABILITATION OF WATERWORKS SYSTEM 9,000,000.00 9,000,000.00 909 BACLAYON 2,000,000.00 3,000,000.00 - - 7,500,000.00 - - - - - - - - - 12,500,000.00 ESTABLISHMENT OF COMMONAL IRRIGATION PROJECT 3,000,000.00 3,000,000.00 PURCHASE OF HAND TRACTORS 1,000,000.00 1,000,000.00 PURCHASE OF FISHING NETS AND PUMPBOATS/ESTABLISHMENT OF "PAYAW" 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 7,500,000.00 7,500,000.00 REHABILITATION/MAINTAINANCE OF EXISTING ARTESIAN/DUGWELLS - EVALUATION, ASSESSMENT, REHABILITATION, AND CONSTRUCTION AND IMPROVEMENT OF WATER WORKS SYSTEM - 910 BALILIHAN 2,200,000.00 750,000.00 - - 1,700,000.00 - 750,000.00 500,000.00 - 550,000.00 - - - 6,050,000.00 12,500,000.00 ARC CONNECTIVITY & ECONOMIC SUPPORT SERVICES (ARCCESS) 500,000.00 500,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) 750,000.00 750,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT 500,000.00 500,000.00 POST HARVEST FACILITIES 700,000.00 700,000.00 SUSTAINABLE AGRI-FISHERY BASED INVESTMENTS 500,000.00 500,000.00 FLOOD CONTROL SYSTEM-PROTECTION OF NATURAL EARTH SINKHOLE 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT: -REHABILITATION OF BALILIHAN WATERWORKS SYSTEM -REHABILITATION OF LEVEL II WATER SYSTEM 1,200,000.00 1,200,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 750,000.00 750,000.00 OFWS REINTEGRATION PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK 550,000.00 550,000.00 PROJECTS TO BE IDENIFIED (RESCUE VEHICLE REMOVED) 4,500,000.00 4,500,000.00 REHABILITATION/MAINTENANCE OF CORE LOCAL ROADS 1,000,000.00 1,000,000.00 PROJECT TO BE IDENTIFIED 550,000.00 550,000.00 911 BATUAN 5,500,000.00 - - - 500,000.00 - - - - 2,000,000.00 - - - 4,500,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS DA PROJECTS 5,000,000.00 5,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (A. LIVESTOCK PRODUCTION - SWINE RAISING, CATTLE RAISING, DAIRY PRODUCTION, GOAT RAISING, SWINE RAISING, AND CATTLE INDUSTRY) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (B. POULTRY PRODUCTION - NATIVE CHICKEN & DUCK RAISING) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (C. VEGETABLE PRODUCTION - FRUIT AND LEAFY & D. SPICES PRODUCTION - SWEET PEPPER, GINGER, BULB ONION ) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (E. INLAND FISH FARMING - TILAPIA AND HITO) - ORGANIC FERTILIZER PRODUCTION - AGRI-FISHERY TRAINING 500,000.00 500,000.00 IMPROVEMENT OF WATER SYSTEM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD DEVELOPMENT PROGRAM (MICRO- ENTERPRISE DEVELOPMENT TRACK)A. HOME AND KITCHEN ACCESSORIES AND TAILORING 2,000,000.00 2,000,000.00 CORE LOCAL ROAD IMPROVEMENT 4,500,000.00 4,500,000.00 912 BIEN UNIDO 6,400,000.00 - - - 4,100,000.00 - - - - 1,000,000.00 - - 1,000,000.00 - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTOR, PLANTER/ SEEDER, HARVESTER, THRESHER, SHELLER, MOTORIZED FISHING BOAT, FISH NETS) 2,000,000.00 2,000,000.00 POST-HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT) 2,000,000.00 2,000,000.00 PORTS AND WHARVES 2,400,000.00 2,400,000.00 VARIOUS DILG PROJECTS 4,100,000.00 4,100,000.00 EVACUATION FACILITY - RESCUE EQUIPMENT - FLOOD CONTROL - SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 TECHNICAL VOCATION TRAINING / COMMUNITY-BASED TRAINING 1,000,000.00 1,000,000.00 913 BILAR 1,250,000.00 - - - 2,000,000.00 - - 1,250,000.00 - - - - - 8,000,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,250,000.00 1,250,000.00 RESCUE EQUIPMENT: PURCHASE OF RESCUE VEHICLE 1,500,000.00 1,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG)- PURCHASE OF WATER CHLORINATOR AND AGITATOR FOR THE PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) 1,250,000.00 1,250,000.00 VARIOUS ROAD PROJECTS 8,000,000.00 8,000,000.00 CORE LOCAL ROADS: DEVELOPMENT OF ROADS LEADING TO TOURIST ATTRACTION - CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE & REHABILITATION - 914 BUENAVISTA 3,928,571.45 - - - 8,142,857.17 - - - - 428,571.43 - - - - 12,500,000.05 VARIOUS DA PROJECTS 3,928,571.45 3,928,571.45 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - (ACQUISITION OF MOTORIZED FISHING BOATS AND FISH NETS) - POST-HARVEST FACILITIES AND EQUIPMENT -(CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT) - CONSTRUCTION OF TRADING POST - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENT - (LIVESTOCK PRODUCTION) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENT - (ORGANIC/INTEGRATED FARMING SYSTEM) - FARM IMPLEMENTS/TOOLS - (ACQUISITION OF HAND TRACTOR, THRESHER, SHELLER, HARVESTER) - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - (EXPANSION/IMPROVEMENT OF EXISTING BARANGAY WATERWORKS) 8,142,857.17 8,142,857.17 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK 428,571.43 428,571.43 915 CALAPE 4,000,000.00 - - 1,500,000.00 4,000,000.00 - 2,000,000.00 - - 1,000,000.00 - - - - 12,500,000.00 ESTABLISHMENT OF FARMERS AND FISHERMEN TRADING POST 4,000,000.00 4,000,000.00 IMPROVEMENT OF EDUCATIONAL SCHOOL FACILITIES 1,500,000.00 1,500,000.00 VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 FLOOD CONTROL - EVACUATION FACILITY - REHABILITATION OF WATER SYSTEM - PURCHASE OF MEDICAL EQUIPMENT AND FACILITIES (FOR HOSPITAL AND BRGY. HEALTH STATIONS) 2,000,000.00 2,000,000.00 CAPABILITY & TRAINING ASSITANCE (COOPERATIVES, WOMEN, OSY, PWDS) 1,000,000.00 1,000,000.00 916 CANDIJAY 1,000,000.00 2,000,000.00 - - 8,500,000.00 - - - - - - - - 1,000,000.00 12,500,000.00 IMPROVEMENT OF CADAPDAPAN-TAMBONGAN CIS 2,000,000.00 2,000,000.00 PRODUCTION OF ORGANIC FERTILIZER 500,000.00 500,000.00 REHAB. OF PASIL REEF MARINE SANCTUARY 500,000.00 500,000.00 VARIOUS WATER PROJECTS 8,500,000.00 8,500,000.00 IMPROVEMENT OF CANDIJAY INTEGRATED WATER SYSTEM - INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 917 CARMEN 2,800,000.00 - - - 5,300,000.00 - - - - 1,500,000.00 - - - 2,900,000.00 12,500,000.00 VARIOUS DA PROJECTS 2,800,000.00 2,800,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENTS - ORGANIC FERTILIZER PRODUCTION - CONSTRUCTION OF IRRIGATION FACILITIES - ACQUISITION OF MEAT VAN - AGRO PROCESSING FACILITIES AND EXPANDED AGRI BUSINESS ACTIVITIES - CONSTRUCTION OF FOOTBRIDGE 1,500,000.00 1,500,000.00 REHABILITATION/IMPROVEMENT OF WATER SYSTEM - POBLACION AREA 3,800,000.00 3,800,000.00 SUSTAINABLE LIVELIHOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION AND REPAIR OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 CONSTRUCTION OF CORE LOCAL ROADS IN BARANGAYS - TOURIST DESTINATION ROADS WITHIN CHOCOLATE HILLS AREA) 2,900,000.00 2,900,000.00 918 CATIGBIAN 4,500,000.00 - - - 6,500,000.00 - - 500,000.00 - - - - 500,000.00 - 12,000,000.00 LIVESTOCK AND POULTRY DISPERSAL A) CARABAO, B) CATTLE, C) GOAT, D) POULTRY 2,500,000.00 2,500,000.00 ACQUISITION OF PRE & POST HARVEST FACILITIES A)MECHANICAL DRYER B) "BOLHOT WITH POWER THRESHER 2,000,000.00 2,000,000.00 VARIOUS WATER PROJECTS 6,500,000.00 6,500,000.00 EXPANSION AND UPGRADING OF WATER SYSTEM TO LEVEL 3 - EXPANSION OF "TUPAD" (TULONG PANGKABUHAYAN PARA SA ATING DISADVANTAGE) WORKERS 500,000.00 500,000.00 EXPANSION OF "SKILLS TRAINING TO OSY AND UNEMPLOYED 500,000.00 500,000.00 919 CLARIN 9,500,000.00 - - - 1,500,000.00 - - - - 1,500,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 9,500,000.00 9,500,000.00 PROVISION OF EQUIPMENTS FOR LIVELIHOOD - PROVISION OF FARM MACHINERIES TO FARMERS: A.) 3 UNITS FLOATING TILLERS B.) 2 UNITS MECHANICAL THRESHERS - REHABILITATION OF MUNICIPAL PORT - REHABILITATION OF IRRIGATION FACILITIES - ACQUISITION OF ONE(1) UNIT DISASTER RESPONSE VEHICLE 1,500,000.00 1,500,000.00 CAPITAL FOR LIVELIHOOD 1,500,000.00 1,500,000.00 PROVISION OF EQUIPMENT TO OSY FOR LIVELIHOOD: A.) INDUSTRIAL B.) CULINARY ARTS C.) BEAUTY CARE - 920 CORELLA 3,509,600.00 - - - - - 570,000.00 - - 4,250,000.00 - - - 4,170,400.00 12,500,000.00 ACQUISITION OF ONE (1) UNIT 90 HEAVY DUTY FARM TRACTOR 3,509,600.00 3,509,600.00 PURCHASE OF BARANGAY HEALTH EQUIPMENT 570,000.00 570,000.00 SUSTAINABLE COMMUNITY LIVELIHOOD PROJECTS 1,750,000.00 1,750,000.00 REHABILITATION AND RETROFITTING OF DAY CARE CENTER 2,500,000.00 2,500,000.00 VARIOUS LGU PROJECTS 4,170,400.00 4,170,400.00 921 CORTES 1,500,000.00 - 500,000.00 2,000,000.00 8,500,000.00 - - - - - - - - - 12,500,000.00 A)PURCHASE OF FARM IMPLEMENTS AND MACHINERIES 500,000.00 500,000.00 B) FISH CAGE/PEN CONSTRUCTION 1,000,000.00 1,000,000.00 A.)REFORESTATION AND REHABILITATION OF WATERSHED AREAS 500,000.00 500,000.00 REPAIR OF SCHOOL BUILDINGS 2,000,000.00 2,000,000.00 VARIOUS WATER PROJECTS 8,500,000.00 8,500,000.00 REHABILITATION/REPAIR OF WATERWORKS SYSTEM AT KALOOY CAVE SPRING,FATIMA & HINAGDANAN CAVE SPRING, NEWLOURDES, CORTES, BOHOL - 922 DAGOHOY 1,000,000.00 - - 1,125,000.00 2,525,000.00 - 1,785,000.00 - - 3,160,000.00 - - - 2,904,000.00 12,499,000.00 CONSTRUCTION OF SMALL FARM RESERVOIR (SFR) 720,000.00 720,000.00 HAND TRACTOR 280,000.00 280,000.00 ABOT-ALAM: FUNCTIONAL SPED CLASSES WITH COMPLETE FACILITIES (INSTRUCTIONAL MATERIALS, CLASSROOM REHABILITATION) 600,000.00 600,000.00 BASIC EDUCATION FACILITIES: PROVISION OF SCHOOL FURNITURE 525,000.00 525,000.00 EVACUATION FACILITY 525,000.00 525,000.00 UPGRADING OF TRANSMISSION PIPELINE OF THE LEVEL 3 WATER SYSTEM 2,000,000.00 2,000,000.00 CONTROL OF INFECTIOUS DISEASE/FP, HIV-AIDS PROGRAM CAPABILITY BUILDING ON UPDATES OF DIAGNOSIS AND TREATMENT MANAGEMENT TRAINING FOR TOT AND MODULES FOR IMPLEMENTERS 200,000.00 200,000.00 REGISTERED NURSE HEALS PROGRAM 400,000.00 400,000.00 RURAL HEALTH MIDWIFE REPLACEMENT PROGRAM 585,000.00 585,000.00 UPGRADING OF BIRTHING FACILITY 600,000.00 600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM- WOMEN SKILLS TRAINING 560,000.00 560,000.00 CONSTRUCTION OF CRISIS CENTER 1,500,000.00 1,500,000.00 REPAIR/UPGRADING OF DAY CARE CENTERS 1,100,000.00 1,100,000.00 CONSTRUCTION AND MAINTENANCE OF CORE LOCAL ROADS - CONCRETING 2,904,000.00 2,904,000.00 923 DANAO 5,000,000.00 - - - 2,000,000.00 - 1,500,000.00 - - - - - - - 8,500,000.00 PROVISION OF PRE-HARVEST FACILITIES (4-WHEELED TRACTOR, SHALLOWTUBE WELLS) 1,000,000.00 1,000,000.00 ESTABLISHMENT OF INTEGRATED DIVERSIFIED ORGANIC FARMING LEARNING SITE 4,000,000.00 4,000,000.00 POTABLE WATER SUPPLY REHABILITATION & EXPANSION 2,000,000.00 2,000,000.00 HEALTH FACILITY ENHANCEMENT (PURCHASE OF INCUBATOR, SUCTION MACHINE, DOPPLER, OTHER LABORATORY EQUIPMENT; CAPDEV) 1,500,000.00 1,500,000.00 924 DAUIS 3,287,810.00 - - 2,550,000.00 - - - 500,000.00 - 500,000.00 - - - 5,662,190.00 12,500,000.00 IMPROVED MARINE PROTECTED AREAS AS ECO-TOURISM SITES 1,109,250.00 1,109,250.00 INTENSIVE MARICULTURE PRODUCTION 978,560.00 978,560.00 PROMOTION OF ORGANIC FERTILIZER PRODUCTION 1,200,000.00 1,200,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR OF CLASSROOMS IN 12 ELEMENTARY SCHOOLS AND THREE (3) SECONDARY SCHOOLS 2,550,000.00 2,550,000.00 PRODUCTION AND MARKETING ENHANCEMENT OF THE JEWELRY MAKING LIVELIHOOD OF DAUIS 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION 5,662,190.00 5,662,190.00 925 DIMIAO 4,500,000.00 - - - 8,000,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DA PROJECTS 4,500,000.00 4,500,000.00 AGRICULTURAL DEVELOPMENT PROJECTS - SUPPORT TO AGRI PROGRAM - IMPROVEMENT OF IRRIGATION CANAL - EXTENSION OF FISH PORT (FISH PORT REHAB) - CRM DEVELOPMENT PROJECTS - LIVELIHOOD DEVELOPMENT PROJECTS - IMPROVEMENT OF PUBLIC MARKET 2,000,000.00 2,000,000.00 EVACUATION CENTER - CONSTRUCTION OF COVERED PAVEMENT 2,000,000.00 2,000,000.00 SALINTUBIG - REHAB WATERWORKS SYSTEM 4,000,000.00 4,000,000.00 926 DUERO 2,000,000.00 - - - 3,500,000.00 - - 500,000.00 1,000,000.00 - 500,000.00 - - 5,000,000.00 12,500,000.00 DEVELOPMENT AGRO PROCESSING FACILITIES 500,000.00 500,000.00 ACQUISITION OF MEAT VANS 500,000.00 500,000.00 ACQUISITION OF FARM EQUIPMENT 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 CONSTRUCTION OF EVACUATION - FLOOD CONTROL - POTABLE WATER SUPPLY IMPROVEMENT - ESTABLISHMENT COOPERATIVE STORE 500,000.00 500,000.00 DUERO ECO TOURISM DEVELOPMENT 1,000,000.00 1,000,000.00 SKILLS TRAINING/VALUE FORMATION SEMINAR 500,000.00 500,000.00 LOCAL ROAD REHABILITATION 5,000,000.00 5,000,000.00 927 GARCIA HERNANDEZ - - - 210,000.00 9,401,550.00 - - - - - - - - 2,888,450.00 12,500,000.00 GULAYAN SA PAARALAN 210,000.00 210,000.00 CONSTRUCTION OF COLLECTION BOX, INTAKE SHED AND CHLORINATOR SHED 900,000.00 900,000.00 REHABILITATION OF 1941 PIPELINES 1,350,000.00 1,350,000.00 VARIOUS DILG PROJECTS 4,631,550.00 4,631,550.00 CONSTRUCTION OF RIVER CONTROL - REHABILITATION/ INSTALLATION OF WATER PIPELINES 1,440,000.00 1,440,000.00 REHABILITATION/ INSTALLATION OF WATER PIPELINES 1,080,000.00 1,080,000.00 CONCRETING OF DATAG-NAN-OD ACCESS ROAD 2,888,450.00 2,888,450.00 928 GUINDULMAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 GUINDULMAN INTEGRATED WATERWORKS SYSTEM - 929 INABANGA 3,000,000.00 - - - 8,000,000.00 - - - - 1,500,000.00 - - - - 12,500,000.00 LIVELIHOOD PROJECT : FOOD PROCESSING (SARDINES & DRIED FISH) 1,500,000.00 1,500,000.00 ESTABLISHEMENT/CONSTRUCTION OF TRADING POST 1,500,000.00 1,500,000.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 CONSTRUCTION OF DRAINAGE SYSTEM @ COMMERCIAL DISTRICT - PURCHASE OF EMERGENCY RESCUE VEHICLE - CONSTRUCTION OF FOOT BRIDGE - REHABILITATION OF WATERWORKS SYSTEM 4,500,000.00 4,500,000.00 CONSTRUCTION OF WOMENS CRISIS CENTER @ MUNICIPAL HALL COMPOUND 1,500,000.00 1,500,000.00 930 JAGNA 1,000,000.00 - - 900,000.00 9,900,000.00 - - - - 700,000.00 - - - - 12,500,000.00 POST HARVEST FACILITY (MULTI-COMMODITY SOLAR TUNNEL DRYER (MCSTD) 500,000.00 500,000.00 TRADING POST 500,000.00 500,000.00 REHABILITATION OF CLASSROOMS FROM THE EFFECTS OF 7.2 MAGNITUDE EARTHQUAKE (BALILI, ODIONG, CANJULAO) 900,000.00 900,000.00 EMERGENCY VEHICLE WITH COMPLETE DISASTER EQUIPMENT 3,500,000.00 3,500,000.00 CONSTRUCTION OF EMERGENCY EVACUATION CENTER AT TUBOD MONTE 900,000.00 900,000.00 VARIOUS WATER PROJECTS 5,500,000.00 5,500,000.00 IMPROVEMENT OF JWS A.) EXPANSION OF WATER SERVICE COVERAGE FROM BUNGA MAR TO CANUBA ; B.) EXPANSION OF WATER SERVICE COVERAGE FROM PANGDAN-ALEJAWAN; C.) INSTALLATION OF WATER TREATMENT/FILTRATION FACILITY - MALBOG WATER SOURCE - CONSTRUCTION OF CRISIS CENTER OF JAGNA 700,000.00 700,000.00 931 GETAFE 2,000,000.00 - - - 8,500,000.00 - - - - - - - - 2,000,000.00 12,500,000.00 FARM IMPLEMENTS 1,000,000.00 1,000,000.00 IRRIGATION PROJECT 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 EVACUATION FACILITY - WATERWORKS SYSTEM (SALINTUBIG) 4,000,000.00 4,000,000.00 CORE LOCAL ROAD 2,000,000.00 2,000,000.00 932 LILA 1,000,000.00 - - 1,000,000.00 1,500,000.00 - 3,500,000.00 - 3,000,000.00 2,500,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT - POST HARVEST FACILITIES AND EQUIPMENT - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD - BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 FLOOD CONTROL 500,000.00 500,000.00 SALINTUBIG 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 LEPROSY, TB CONTROL, STI/HIV AND AIDS PREVENTION 500,000.00 500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS RNHEALS 1,000,000.00 1,000,000.00 RURAL HEALTH MIDWIFE REPLACEMENT PROGRAM 500,000.00 500,000.00 BRANDING 500,000.00 500,000.00 CONSTRUCTION OF VISITOR'S INFORMATION CENTER 1,000,000.00 1,000,000.00 MARKETING AND PROMOTIONS PARTICIPATION IN TRAVEL FAIRS 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT - CONSTRUCTION OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT - REPAIR/UPGRADING OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 933 LOAY 3,000,000.00 - - 4,000,000.00 5,500,000.00 - - - - - - - - - 12,500,000.00 ACQUISITION OF PRE AND POST HARVEST FACILITIES 3,000,000.00 3,000,000.00 REPAIR & IMPROVEMENT OF CLASSROOMS 4,000,000.00 4,000,000.00 VARIOUS WATER PROJECTS 5,500,000.00 5,500,000.00 INSTALLATION AND DEVELOPMENT OF WATER WORK SYSTEM - 934 LOBOC 8,300,000.00 1,000,000.00 - - 3,200,000.00 - - - - - - - - - 12,500,000.00 PROVISION OF PLANTING MATERIALS SICH AS GINGER TUBERS, GUYABANO, JACKFRUIT AND VEGETABLE SEEDS (ESTABLISHMENT OF FARM LEVEL NURSERIES AND CAPABILITY BUIDLING OF FARMERS) 2,000,000.00 2,000,000.00 LIVESTOCK DISPERSAL - ACQUISITION OF SWINE, GOAT, CHICKEN & CARABAO 2,300,000.00 2,300,000.00 ESTABLISHMENT OF FARMER'S TRADING POST 4,000,000.00 4,000,000.00 CONCRETING OF IRRIGATION CANAL LINING 1,000,000.00 1,000,000.00 CONSTRUCTION OF FILTRATION FACILITY 3,200,000.00 3,200,000.00 935 LOON 5,219,000.00 250,000.00 207,000.00 - 1,984,000.00 - 500,000.00 500,000.00 - - - - 3,864,000.00 - 12,524,000.00 LIVELIHOOD ASSISTANCE:B) SEA WEEDS PRODUCTION 400,000.00 400,000.00 LIVELIHOOD ASSISTANCE:C) FISH ATTRACTING DEVICE 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE: D) NATIVE CHICKEN PRODUCTION 300,000.00 300,000.00 LIVELIHOOD ASSISTANCE: E) GOAT DISPERSAL 625,000.00 625,000.00 LIVELIHOOD ASSISTANCE:F) ORGANICALLY-GROWN VEGETABLE PRODUCTION 300,000.00 300,000.00 LIVELIHOOD ASSISTANCE: G) ORGANIC FERTILIZER PRODUCTION 294,000.00 294,000.00 LIVELIHOOD ASSISTANCE: H) COMMUNITY IRRIGATION 250,000.00 250,000.00 LIVELIHOOD ASSISTANCE: I) DRAFT ANIMALS (CARABAOS) DISPERSAL 300,000.00 300,000.00 SUPPORT INFRASTRUCTURES: C) CONSTRUCTION OF TRADING CENTER (SATELLITE MARKET) 1,500,000.00 1,500,000.00 FRUITS FOR OUR FUTURE PROJECT /GREENING PROGRAM 1,000,000.00 1,000,000.00 J) MAINTENANCE OF MPA 207,000.00 207,000.00 VARIOS DILG PROJECTS 1,850,000.00 1,850,000.00 SUPPORT INFRASTRUCTURES: B) CONSTRUCTION OF WELL FOR DIST. 1 BARANGAYS - PURCHASE OF RESCUE VEHICLES/ EQUIPMENT: A) DUMP TRUCK - PURCHASE OF RESCUE VEHICLES/ EQUIPMENT: B) RESCUE EQUIPMENT - PURCHASE OF RESCUE VEHICLES/ EQUIPMENT: C) SOLAR PANEL & ACCESSORIES - SKILLS TRAINING:I) POTABLE WATER PURIFICATION 134,000.00 134,000.00 CAPABILITY BUILDING PROGRAMS FOR RHU STAFF & OTHER HEALTH WORKERS 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE: A) MAT AND BASKET WEAVING 500,000.00 500,000.00 SKILLS TRAINING: A) CARPENTRY 340,000.00 340,000.00 SKILLS TRAINING:B) MASONRY 340,000.00 340,000.00 SKILLS TRAINING:C) WELDING 340,000.00 340,000.00 SKILLS TRAINING:D) PLUMBING 340,000.00 340,000.00 SKILLS TRAINING:E) ELECTRICAL/SOLAR POWER SYSTEM 210,000.00 210,000.00 SKILLS TRAINING:F) CANDLE MAKING 60,000.00 60,000.00 SKILLS TRAINING:G) COSMETOLOGY 40,000.00 40,000.00 SKILLS TRAINING:H) COOKING 100,000.00 100,000.00 SKILLS TRAINING:J) EVENT ORGANIZING 70,000.00 70,000.00 SKILLS TRAINING (CARPENTRY, MASONRY, WELDING, PLUMBING, ELECTRICAL, CANDLEMAKING, COSMETOLOGY, COOKING, EVENT ORGANIZING) 2,024,000.00 2,024,000.00 936 MABINI 2,440,000.00 - - 3,260,000.00 - - 2,000,000.00 1,000,000.00 - 1,500,000.00 2,300,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 2,440,000.00 2,440,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES - BASIC EDUCATION FACILITIES- REPAIR/REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 GULAYAN SA PAARALAN 260,000.00 260,000.00 BASIC EDUCATION FACILITIES-PROVISION OF SCHOOL FURNITURES 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 1,000,000.00 1,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT 1,500,000.00 1,500,000.00 YAMAN PINOY 700,000.00 700,000.00 SHARED SERVICE FACILITY 1,600,000.00 1,600,000.00 937 MARIBOJOC - 500,000.00 - - 11,000,000.00 - 500,000.00 - - 500,000.00 - - - - 12,500,000.00 REHABILITATION IRRIGATION SYSTEM AS PART OF AGRICULTURAL SUPPORT PROGRAM FOR FARMERS 500,000.00 500,000.00 VARIOUS WATER PROJECTS 11,000,000.00 11,000,000.00 IMPROVEMENT OF WATERWORKS SYSTEM - CONSTRUCTION OF BARANGAY HEALTH CENTER 500,000.00 500,000.00 CONSTRUCTION OF PWD BUILDING PHASE 1 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 938 PANGLAO 3,039,000.00 - - 1,280,000.00 2,150,000.00 - 2,800,000.00 800,000.00 - 1,931,000.00 - - 500,000.00 - 12,500,000.00 PUMP BOAT WITH FISHING PARAPHERNALIA 630,000.00 630,000.00 FISH CAGE 540,000.00 540,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 BLUE CRAB SPAWNING PEN 500,000.00 500,000.00 SEA WEEDS CUM ABALONE CULTURE 869,000.00 869,000.00 CLASSROOM REPAIR/REHAB 1,150,000.00 1,150,000.00 GULAYAN SA PAARALAN 130,000.00 130,000.00 VARIOUS DILG PROJECTS 2,150,000.00 2,150,000.00 BIL-ISAN RESERVOIR W/ DISTRIBUTION LINES - TAWALA RESERVOIR W/ DISTRIBUTION LINES - BARANGAY HEALTH STATION 1,800,000.00 1,800,000.00 CDC AUTOMATED LABORATORY MACHINE 1,000,000.00 1,000,000.00 TUBELESS TIRE VULCANIZING SHOP 800,000.00 800,000.00 REPAIR OF ALL DAY CARE CENTERS 1,300,000.00 1,300,000.00 SOUVENIR SHOP 631,000.00 631,000.00 MASSAGE CENTER (SKILLS TRAINING ON MASSAGE THERAPY) 500,000.00 500,000.00 939 PILAR 3,300,000.00 - - - 9,200,000.00 - - - - - - - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 2,800,000.00 2,800,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 VARIOUS WATER PROJECTS 9,200,000.00 9,200,000.00 REHABILITATION/UPGRADING OF LEVEL III WATER SUPPLY INCLUDING APPROPRIATE WATER TREATMENT - 940 PRES. CARLOS P. GARCIA 3,500,000.00 - - 1,300,000.00 2,000,000.00 - 800,000.00 - - 500,000.00 - - - 4,400,000.00 12,500,000.00 PROVISION OF FISH NETS & BOATS 2,000,000.00 2,000,000.00 PROVISION OF FARMNG TOOLS/MATERIALS 1,500,000.00 1,500,000.00 GULAYAN/ BACKYARD GARDENING 300,000.00 300,000.00 REPAIR OF SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 CONSTRUCTION OF RAIN COLLECTOR 500,000.00 500,000.00 REHABILITATION AND EXPANSION OF SEAWALL 1,500,000.00 1,500,000.00 PROVISION OF TOILET BOWL 800,000.00 800,000.00 CONSTRUCTION OF WOMEN'S CRISIS CENTER/EVACUATION CENTER 500,000.00 500,000.00 IMPROVEMENT OF CORE LOCAL ROADS 4,400,000.00 4,400,000.00 941 SAGBAYAN 1,900,000.00 - - 300,000.00 6,100,000.00 - - - - 1,200,000.00 - - - 3,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,900,000.00 1,900,000.00 CONSTRUCTION OF IRRIGATION FACILITY - INFRASTRUCTURE SUPPORT TO AGRICULTURE - GULAYAN SA PAARALAN 300,000.00 300,000.00 IMPRVT./REHAB. OF EVACUATION CENTER 4,000,000.00 4,000,000.00 IMPROVEMENT OF WATERWORKS SYSTEM 2,100,000.00 2,100,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,200,000.00 1,200,000.00 REHAB/IMPROVEMENT OF CORE LOCAL ROAD 3,000,000.00 3,000,000.00 942 SAN ISIDRO 7,050,000.00 - - - 2,800,000.00 - - - - 2,650,000.00 - - - - 12,500,000.00 CONSTRUCTION OF MUNICIPAL TRADING POST 3,210,000.00 3,210,000.00 PURCHASE OF ORGANIC FERTLIZER 600,000.00 600,000.00 PURCHASE OF RICE SEEDS 540,000.00 540,000.00 CONSTRUCTION OF MECHANICAL FLAT BED DRYER 750,000.00 750,000.00 SWINE DISPERSAL 750,000.00 750,000.00 CATTLE RAISING DISPERSAL 1,200,000.00 1,200,000.00 VARIOUS DILG PROJECTS 2,800,000.00 2,800,000.00 ACQUISITION OF MUNICIPAL DISASTER RESPONSE VEHICLE - REHABILITATION OF THE MUNICIPAL WATERWORKS SYSTEM (LEVEL III) - CONSTRUCTION OF DAY CARE CENTER 900,000.00 900,000.00 REHABILITATION OF FAMILY AND CHILD CARE CENTER 800,000.00 800,000.00 REPAIR OF SENIOR CITIZEN BUILDING 950,000.00 950,000.00 943 SAN MIGUEL 2,750,000.00 - 500,000.00 - 5,000,000.00 - - - 2,000,000.00 - - - 500,000.00 1,750,000.00 12,500,000.00 VARIOUS DA PROJECTS 2,750,000.00 2,750,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES - ESTABLISHMENT OF TRADING POST - ORGANIC FERTILIZER PRODUCTION - NATIONAL GREENING PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 3,000,000.00 3,000,000.00 CONSTRUCTION OF SAN MIGUEL LEVEL II WATER SYSTEM 2,000,000.00 2,000,000.00 ESTABLISHMENT OF LOCAL TOURISM INFORMATION CENTER 2,000,000.00 2,000,000.00 VARIOUS ROAD PROJECTS 1,750,000.00 1,750,000.00 REHABILITATION OF CORE ROAD WITH STEEL BRIDGE - TECHNICAL VOCATION TRAINING/COMMUNITY-BASED TRAINING 500,000.00 500,000.00 944 SEVILLA 2,350,000.00 - - 1,160,000.00 5,750,000.00 - 500,000.00 - 1,000,000.00 1,740,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 2,350,000.00 2,350,000.00 VEGETABLE PRODUCTION - PURCHASE OF FLATBED DRIER - NATIVE CHICKEN PRODUCTION - GULAYAN SA PAARALAN 160,000.00 160,000.00 REPAIR OF CLASSROOOMS 1,000,000.00 1,000,000.00 VARIOUS WATER PROJECTS 5,750,000.00 5,750,000.00 EXPANSION OF LEVEL III MUN. WATERWORKS SYSTEM - PURCHASE OF ESSENTIAL MEDICINES 500,000.00 500,000.00 CONSTRUCTION OF VISITOR'S INFORMATION CENTER 1,000,000.00 1,000,000.00 IMPROVEMENT OF DAY CARE CENTERS 600,000.00 600,000.00 CONSTRUCTION OF EVACUATION CENTER 1,140,000.00 1,140,000.00 945 SIERRA BULLONES - 884,917.55 - - 1,991,064.48 - - - - - - - - 9,624,017.97 12,500,000.00 IRRIGATION REHABILITATION 884,917.55 884,917.55 RESCUE EQUIPMENT 1,106,146.93 1,106,146.93 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALIN TUBIG) PROVISION OF POTABLE WATER SUPPLY 884,917.55 884,917.55 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 9,624,017.97 9,624,017.97 946 SIKATUNA 1,000,000.00 - - - 9,500,000.00 - 1,000,000.00 - - 1,000,000.00 - - - - 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENTS OF SMALL FARM RESERVOIR 500,000.00 500,000.00 ENHANCEMENT OF FARM PRODUCTION THROUGH PROVISION OF FARM INPUTS TO REGISTERED FARMERS 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER FOR PWD 1,000,000.00 1,000,000.00 VARIOUS WATER PROJECTS 8,500,000.00 8,500,000.00 EXPANSION & REHABILITATION OF MUNICIPAL WATER WATER WORKS - REHABILITATION OF BARANGAY HEALTH STATION OF ABUCAY NORTE 500,000.00 500,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 500,000.00 500,000.00 REPAIR AND UPGRADING OF DAY CARE CENTERS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM THROUGH LIVESTOCK PRODUCTION FOR PANTAWID BENEFICIARIES 500,000.00 500,000.00 947 TAGBILARAN CITY 5,000,000.00 - - - 1,800,000.00 - 700,000.00 - - 5,000,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 5,000,000.00 5,000,000.00 REPAIR/REHABILITATION OF FISHPORT AND INSTALLATION OF COLD STORAGE FACILITY - INTEGRATED PEST MANAGEMENT FARMERS FIELD SCHOOL ON VEGETABLE PRODUCTION - CONSTRUCTION OF NEWPUMPING UNIT AND CONSTRUCTION OF MAIN PIPELINE 1,800,000.00 1,800,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (EXTENSION OF RHU) 700,000.00 700,000.00 CONSTRUCTION OF TAGBILARAN CITY PAGLAUM CENTER (CRISIS INTERVENTION CENTER) 5,000,000.00 5,000,000.00 948 TALIBON 13,200,000.00 - 1,149,500.00 2,000,000.00 - - - - - - - - - 4,150,500.00 20,500,000.00 VARIOUS DA PROJECTS 11,200,000.00 11,200,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND DEVELOPMENT - (PURCHASE OF TWO (2) HEAVY DUTY TRACTORS) - POST-HARVEST FACILITIES AND EQUIPMENT - (CONSTRUCTION OF THREE (3) UNITS MECHANICAL DRYER AND POST-HARVEST FACILITIES /PALAY SHED) - MUNICIPAL COLD STORAGE FACILITY - TRADING POST/BAGSAKAN CENTER - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS - (CONSTRUCTION OF TALIBON FRY HATCHERY) 2,000,000.00 2,000,000.00 NATIONAL GREENING PROGRAM (NGP) - (FAMILY BASE SEEDLING PRODUCTION/PROPAGATION AND TREE PLANTING) 1,149,500.00 1,149,500.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION /MAINTENANCE/ REHABILITATION - (CONSTRUCTION/REPAIR OF MUNICIPAL ROADS WITHIN URBAN AREA) 4,150,500.00 4,150,500.00 949 TRINIDAD - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 DEVELOPMENT AND CONSTRUCTION OF WATER SUPPLY SYSTEM - 950 TUBIGON 2,505,000.00 - - 1,737,000.00 778,000.00 - - - 4,000,000.00 2,980,000.00 500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 2,505,000.00 2,505,000.00 ORGANIC FERTILIZER PRODUCTION - DISTRIBUTION OF FARM MACHINERY - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENT - MARINE RESERVE AND FISH SANCTUARIES - MARINE PROTECTED AREAS (MPA) - INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION - INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION - REHABILITATION OF CLASSROOMS 1,737,000.00 1,737,000.00 PURCHASE OF RESCUE EQUIPMENT 778,000.00 778,000.00 TOURISM INFORMATION CENTER 4,000,000.00 4,000,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 1,000,000.00 1,000,000.00 REHABILITATION/ IMPROVEMENT OF TUBIGON DROP-IN CENTER 500,000.00 500,000.00 REHABILITATION OF TUBIGON EVACUATION CENTER 800,000.00 800,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITIES WITH COMPLETE SET OF HYGIENE KIT 680,000.00 680,000.00 IMPROVEMENT OF TUBIGON SHARED SERVICE FACILITY 500,000.00 500,000.00 951 UBAY 9,500,000.00 - - 1,000,000.00 9,000,000.00 - - - - 3,000,000.00 - - - - 22,500,000.00 VARIOUS FISHERY PROJECTS 1,500,000.00 1,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD - ORGANIC FERTILIZER PRODUCTION AND TRAINING 1,000,000.00 1,000,000.00 PROCUREMENT OF POST HARVEST EQUIPMENT / PROVISION OF FARM MACHINERIES (THRESHER) -- POST-HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT 3,000,000.00 3,000,000.00 LIVELIHOOD PROGRAMS ON CARABAO LIVESTOCK PRODUCTION 1,500,000.00 1,500,000.00 NATURAL FARMING AND INBRED RICE SEED PRODUCTION 2,000,000.00 2,000,000.00 PURCHASE OF PARAPHERNALIA AND DISTRIBUTION TO FISHER FOLKS 500,000.00 500,000.00 REPAIR OF CLASSROOMS 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER (EVACUATION FACILITY) 5,000,000.00 5,000,000.00 PROCUREMENT OF RESCUE VEHICLES 1,000,000.00 1,000,000.00 CONSTRUCTION OF WATERWORKS SYSTEM 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) FOR FINANCIAL ASSISTANCE-MICRO FINANCING (MATS, BAGS AND BAYONG WEAVING) 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS (SUSTAINABLE LIVELIHOOD PROGRAM (SLP) FOR RICE, CORN AND VEGETABLE PRODUCTION) 2,000,000.00 2,000,000.00 952 VALENCIA 2,300,000.00 - - 1,200,000.00 5,050,000.00 - 1,000,000.00 - - 2,500,000.00 - - - 450,000.00 12,500,000.00 SANCTUARY GUARDHOUSE (INCLUDES EXPANSION OF SANCTUARY) 500,000.00 500,000.00 CORN SEED LIVELIHOOD PROGRAM 500,000.00 500,000.00 HYBRID RICE SEED LIVELIHOOD PROGRAM 800,000.00 800,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 ALS LIVELIHOOD PROGRAM 500,000.00 500,000.00 REPAIR OF CLASSROOMS OF VALENCIA NATIONAL TECH-VOC HIGH SCHOOL & VALENCIA CENTRAL ELEMENTARY SCHOOL 700,000.00 700,000.00 CONSTRUCTIONS OF CANALS (OMJON) 1,000,000.00 1,000,000.00 REHABILITATION, EXPANSION, UPGRADING, OF WATER SUPPLY SYSTEM (LGU OPERATED WW) 1,350,000.00 1,350,000.00 PROCUREMENT AND IMPROVEMENT OF POTABLE WATER FACILITIES (BARANGAYOPERATED WW) 2,700,000.00 2,700,000.00 IMPROVEMENT OF MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION IN VALENCIA 500,000.00 500,000.00 VALENCIA HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 VARIOUS KC PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF RIVER FLOOD CONTROL (PANANGATAN RIVER) - CONCRETING OF ROADS (TAYTAY,PANGI-AN) 450,000.00 450,000.00 CEBU PROVINCE 178,649,200.00 7,000,000.00 12,428,500.00 49,417,250.00 235,674,000.00 2,000,000.00 62,037,300.00 18,059,600.00 18,850,000.00 93,652,000.00 7,148,750.00 - 13,150,000.00 130,883,400.00 828,950,000.00 953 ALCANTARA 2,800,000.00 - - 2,350,000.00 4,350,000.00 - 600,000.00 - - 2,400,000.00 - - - - 12,500,000.00 CONSTRUCTION OF CATCH BASIN AND INSTALLATION OF SUBMERSIBLE PUMP 600,000.00 600,000.00 CONSTRUCTION OF FISH PENS 2,200,000.00 2,200,000.00 REPAIR OF CLASSROOM: 9 SCHOOL BUILDINGS IN ES AT P200,000.00 1,800,000.00 1,800,000.00 REPAIR OF CLASSROOM: 1 SCHOOL BUILDING IN HS AT P200,000.00 200,000.00 200,000.00 GULAYAN SA PAARALAN - 9 ES AT P15,000.00 135,000.00 135,000.00 GULAYAN SA PAARALAN -1 HS AT P15,000.00 15,000.00 15,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM (ALS) 200,000.00 200,000.00 VARIOUS DILG PROJECTS 4,350,000.00 4,350,000.00 CONSTRUCTION OF BOARDWALK/FOOTBRIDGE AND AMENITIES - CAPABILITY BUILDING FOR LGUS ON HEALTH PROGRAMS (DOTS TRAINING FOR HEALTH PERSONNEL, HEALTH EMERGENCY MANAGEMENT TRAINING, E-FHSIS ORIENTATION, BEMONC TRAINING, RABIES TRAINING) 315,000.00 315,000.00 MEDICAL SUPPLIES FOR 9 BHS AND MAIN RHU (BP APPARATUS, THERMOMETER, BETADINE, COTTON BALLS, PLASTER AND GAUZE) 285,000.00 285,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: EMPLOYMENT FACILITATION TRACK 500,000.00 500,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS: CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS: ESTABLISHMENT OF OPDA 500,000.00 500,000.00 PROTECTIVE SERVICES- CAPACITY BUILDING : PROVISION OF ECCD LEARNING MATERIALS FOR DCC 900,000.00 900,000.00 954 ALCOY - - - 900,000.00 1,000,000.00 - 2,000,000.00 - 1,500,000.00 6,000,000.00 - - - 1,100,000.00 12,500,000.00 BASIC EDUCATION FACILITIES - REPAIR AND REHABILITATION OF CLASSROOMS 900,000.00 900,000.00 SALINTUBIG-POTABLE WATER SUPPLY 1,000,000.00 1,000,000.00 HEALTH FACILITIES IMPROVEMENT PROGAM 1,500,000.00 1,500,000.00 HEALTH FACILITIES IMPROVEMENT PROGAM 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECT: CONSTRUCTION OF TOURISM CENTER 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 6,000,000.00 6,000,000.00 VARIOUS LGU PROJECTS 1,100,000.00 1,100,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - 955 ALEGRIA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY FOR ALEGRIA - 956 ALOGUINSAN 10,500,000.00 - - - - - - - 2,000,000.00 - - - - - 12,500,000.00 VARIOUS DA PROJECTS 10,500,000.00 10,500,000.00 SUSTAINABLE LIVELIHOOD PROJECTS - TOURISM (DIVE AND RIDE) 2,000,000.00 2,000,000.00 957 ARGAO 4,000,000.00 - - 1,525,000.00 6,800,000.00 - 5,200,000.00 - - 1,975,000.00 - - - - 19,500,000.00 INFRASTRUCTURE SUPPORT TO AGRI AND FISHERY PRODUCTION (MOTORIZED FISHING BOATS AND FISH NETS 4,000,000.00 4,000,000.00 REHABILITATION OF CLASSROOMS 637,500.00 637,500.00 GULAYAN SA PAARALAN 250,000.00 250,000.00 REHABILITATION OF CLASSROOMS 637,500.00 637,500.00 VARIOUS DILG PROJECTS 4,800,000.00 4,800,000.00 ESTABLISHMENT OF 5 EVACUATION CENTER - ENHANCEMENT POTABLE WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 HEALTH ENHANCEMENT FACILITY PROGRAM 5,200,000.00 5,200,000.00 CROP PRODUCTION LOAN AND MARKETING ASSISTANCE PROGRAM 1,975,000.00 1,975,000.00 958 ASTURIAS 10,500,000.00 - - - - - - - - - - - 2,000,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 10,500,000.00 10,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENT - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION ( MOTORIZED FISHING BOAT) - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TECHNICAL VOCATIONAL TRAINING / COMMUNITY-BASED TRAINING 1,000,000.00 1,000,000.00 TECHNICAL VOCATIONAL TRAINING 1,000,000.00 1,000,000.00 959 BADIAN 2,500,000.00 - - 500,000.00 1,600,000.00 - 650,000.00 1,000,000.00 3,250,000.00 2,350,000.00 - - 650,000.00 - 12,500,000.00 VARIOS DA PROJECTS 2,500,000.00 2,500,000.00 PROVISION OF MOTORIZED BOATS AND NETS - MULTICROPPING IN THE UPLAND AREA - ORGANIC FERTILIZER PRODUCTION - PROVISION OF SEEDS AND ORGANIC FERTILIZER FOR SCHOOL GARDEN (GULAYAN SA PAARALAN) 500,000.00 500,000.00 PROVISION OF POTABLE WATER SYSTEM (SALINTUBIG) 1,600,000.00 1,600,000.00 HEALTH EMERGENCY MANAGEMENT 650,000.00 650,000.00 INTEGRATED LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 COMMUNITY-BASED TOUR GUIDING SEMINAR 500,000.00 500,000.00 TOURISM INFORMATION CENTER FOR KAWASAN 1,000,000.00 1,000,000.00 TOURISM INFORMATION CENTER FOR LAMBUG 1,000,000.00 1,000,000.00 TOURISM INFORMATION CENTER FOR MALHIAO 750,000.00 750,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,350,000.00 2,350,000.00 TECHINICAL AND SKILLS TRAINING 650,000.00 650,000.00 960 BALAMBAN 11,500,000.00 5,000,000.00 - - - - - - - - - - - - 16,500,000.00 VARIOUS DA PROJECTS 10,000,000.00 10,000,000.00 FISH PORT - IRRIGATION SYSTEM 5,000,000.00 5,000,000.00 FARMING EQUIPMENT - MOTORIZED BOATS/FISH NETS 1,500,000.00 1,500,000.00 AGRI-BUSINESS LIVELIHOOD TRAININGS - 961 BANTAYAN - - - - 26,500,000.00 - - - - - - - - - 26,500,000.00 VAROUS DILG PROJECTS 14,900,000.00 14,900,000.00 ESTABLISHMENT OF EVACUATION CENTERS - ACQUISITION OF LOT FOR RELOCATION SITE - SALINTUBIG 11,600,000.00 11,600,000.00 962 BARILI 5,000,000.00 - - 2,900,000.00 - - - - 1,000,000.00 - - - - 7,600,000.00 16,500,000.00 TRADING POST 5,000,000.00 5,000,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 REPAIR & REHABILITATION OF CLASSROOMS 1,800,000.00 1,800,000.00 REPAIR OF SCHOOL CLASSROOMS 600,000.00 600,000.00 VISITOR INFORMATION CENTER 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 2,700,000.00 2,700,000.00 CORE LOCAL ROAD REHABILITATION 4,900,000.00 4,900,000.00 963 BOLJOON 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 BOLJOON MUNICIPAL FISHERY PORT 12,500,000.00 12,500,000.00 964 BORBON 1,500,000.00 - - 2,000,000.00 5,000,000.00 - 1,000,000.00 - - - - - - 3,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,500,000.00 1,500,000.00 SUSTAINABLE AGRICULTURE-BASED LIVELIHOOD AND OTHER AGRI-BUSINESS INVESTMENTS - INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT - MARINE PROTECTED AREAS - BASIC EDUCATION FACILITIES: REPAIR / REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 5,000,000.00 5,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 3,000,000.00 3,000,000.00 965 CARMEN 4,000,000.00 - - - - - - - - - - - - 8,500,000.00 12,500,000.00 ORGANIC FARMING 4,000,000.00 4,000,000.00 VARIOUS ROAD PROJECTS 8,500,000.00 8,500,000.00 LOCAL CORE ROADS - LOCAL CORE ROADS - LOCAL CORE ROADS - LOCAL CORE ROADS - LOCAL CORE ROADS - LOCAL CORE ROADS - LOCAL CORE ROADS - LOCAL CORE ROADS - LOCAL CORE ROADS - 966 CATMON - - - 4,500,000.00 - - - - - - - - - 5,600,000.00 10,100,000.00 REHABILITATION OF GABALDON BUILDING 4,500,000.00 4,500,000.00 FULLWAY ROAD CONCRETING 5,600,000.00 5,600,000.00 967 CEBU CITY (CAPITAL) - - - - 3,000,000.00 - 3,100,000.00 1,600,000.00 - 16,100,000.00 - - 600,000.00 - 24,400,000.00 PORTABLE, COLLAPSIBLE CUBICLES FOR EVACUATION CENTERS 2,000,000.00 2,000,000.00 PATUBIG TO MOUNTAIN SITIOS IN BARANGAY QUIOT 1,000,000.00 1,000,000.00 CAPABILITY BUILDING FOR COMMUNITY HEALTH TEAMS ON HEALTH PROGRAMS, AND WATER SANITATION 1,000,000.00 1,000,000.00 HEALTH FACILITIY ENHANCEMENT 2,100,000.00 2,100,000.00 INTEGRATED YOUTH DEVELOPMENT PROGRAM (SPORTS, CULTURE AND ARTS, FARMING SKILLS TRAINING, ADVOCACY WORK) 600,000.00 600,000.00 AGRO-INDUSTRIAL LIVELIHOOD PROJECT FOR CEBU CITY'S URBAN POOR HOMEOWNER'S ASSOCIATION 1,000,000.00 1,000,000.00 ECONOMIC/LIVELIHOOD CENTER FOR PWDS 3,000,000.00 3,000,000.00 ESTABLISHING A STIMULATION THERAPEUTIC/REHABILITATION FOR PWDS; SHELTERED WORKSHOP-INTEGRATION OF PWDS LIVELIHOOD (TO CATER CRUTCHES, CANE, WHEEL CHAIR REPAIR, AND PHOSTETIC MAKING AND REPAIR); CAPABILITY TRAINING AS TRAINERS FOR PWDS ASSIGNED FOR REHABILITATION AND PRODUCTION OF NEEDED EQUIPMENTS) 1,800,000.00 1,800,000.00 PURCHASE OF WELDING MACHINE EQUIPMENT, CUTTING EQUIPMENT/INDUSTRIAL 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR SENIOR CITIZENS - UPLAND FISH CULTURE 4,000,000.00 4,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS LIVELIHOOD FOR URBAN POOR MEN AND WOMEN 2,300,000.00 2,300,000.00 LIVELIHOOD SKILLS TRAINING; ESTABLISH A LIVELIHOOD PROGRAM THROUGH PROVISION OF CAPITAL AS WELL AS ACCESS OF CAPITAL LODGED WITH NGAS 3,000,000.00 3,000,000.00 VOCATIONAL SCHOLARSHIP PROGRAMS 600,000.00 600,000.00 968 CITY OF BOGO - - - - 11,200,000.00 - 2,600,000.00 - 4,400,000.00 - - - - - 18,200,000.00 WATER EXPANSION - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) 11,200,000.00 11,200,000.00 HEALTH EMERGENCY MANAGEMENT 800,000.00 800,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,200,000.00 1,200,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 600,000.00 600,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 2,800,000.00 2,800,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 1,600,000.00 1,600,000.00 969 CITY OF CARCAR 5,600,000.00 - - 300,000.00 1,458,000.00 - - 3,319,600.00 - 5,520,000.00 - - - 2,302,400.00 18,500,000.00 SUSTAINABLE AGRI-BUSINESS AND RURAL ENTERPRISE DEVELOPMENT (SARED) 2,000,000.00 2,000,000.00 MARINE RESERVE AND FISH SANCTUARIES 1,500,000.00 1,500,000.00 VARIOUS DA PROJECTS 2,100,000.00 2,100,000.00 POST HARVEST FACILITIES AND EQUIPMENT - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - GULAYAN SA PAARALAN 300,000.00 300,000.00 SALINTUBIG (REHABILITATION AND IMPROVEMENT OF WATER SYSTEM) 1,458,000.00 1,458,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DILP) 3,319,600.00 3,319,600.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICROENTERPRISE DEVELOPMENT TRACK) 2,000,000.00 2,000,000.00 PROTECTIVE SERVICES (CONSTRUCTION OF 2 DAYCARE CENTERS) 1,520,000.00 1,520,000.00 PROTECTIVE SERVICES (REPAIR AND UPGRADING OF DAYCARE CENTERS) 2,000,000.00 2,000,000.00 CORE LOCAL ROADS CONSTRUCTION 2,302,400.00 2,302,400.00 970 CITY OF NAGA 2,300,000.00 - - - - - 1,500,000.00 - - 2,000,000.00 - - - 11,700,000.00 17,500,000.00 SUSTAINABLE AGRI-BUSINESS AND RURAL ENTERPRISE DEVELOPMENT (SARED) 800,000.00 800,000.00 TECHNOLOGY PACKAGE ON COMMUNITY-BASED COMPOSTING FACILITY (VERMI COMPOSTING) 600,000.00 600,000.00 MOTORIZED FISHING BOAT AND FISHING NET 900,000.00 900,000.00 TRAINING ON MATERNAL NEONATAL CHILD HEALTH 7 NUTRITION, COMMUNITY HEALTH TEAM, RABIES ELIMINATION, LEPROSY, STI/HIV AND AIDS PREVENTION, DENGUE CONTROL, RNHEALS 1,500,000.00 1,500,000.00 PROCUREMENT OF FURNITURES AND EQUIPMENTS FOR DCCS 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION 11,700,000.00 11,700,000.00 971 CITY OF TALISAY 2,250,000.00 - - - 500,000.00 - 8,900,000.00 900,000.00 - 6,550,000.00 2,400,000.00 - 2,000,000.00 - 23,500,000.00 AGRI-FISHERY TRAININGS 550,000.00 550,000.00 IRRIGATION PROJECTS 500,000.00 500,000.00 MARINE PROTECTED AREAS & SUSTAINABLE AGRIFISHERY BASED PROJECT 1,200,000.00 1,200,000.00 SALING TUBIG II 500,000.00 500,000.00 MATERNAL, NEONATAL CHILD HEALTH AND NUTRITION 3,000,000.00 3,000,000.00 RABIES ELIMINATION 3,000,000.00 3,000,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 1,150,000.00 1,150,000.00 STI/HIV AND AIDS PREVENTION 1,030,000.00 1,030,000.00 TB CONTROL 720,000.00 720,000.00 TULONG PANGKABUHAYAN PARA SA DISADVANTAGE WORKERS 900,000.00 900,000.00 VARIOUS KC PROJECTS 3,700,000.00 3,700,000.00 PROTECTIVE SERVICES INFRA PROJ. UPGRADING OF DAY CARE CTRS - PROTECTIVE SERVICES INFRA PROJ. COMMON HAND WASHING FACILITIES - PROVISION OF ECCD LEARNING MATLS FOR DCCS AND SNP 750,000.00 750,000.00 PROVISION OF HYGIENE KITS IN DCCS 600,000.00 600,000.00 CAPABILITY BLDG. FOR DAY CARE WORKERS & S&P 500,000.00 500,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER - SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 YAMAN PINOY 1,400,000.00 1,400,000.00 OTOP STORE EXPRESS 1,000,000.00 1,000,000.00 TECHNICAL VOCATION TRAINING / COMMUNITY-BASED TRAINING 2,000,000.00 2,000,000.00 972 COMPOSTELA 7,500,000.00 - - - 5,000,000.00 - - - - - - - - - 12,500,000.00 WHARF 7,500,000.00 7,500,000.00 CONSTRUCTION OF WATER SYSTEM (SALINTUBIG) 5,000,000.00 5,000,000.00 973 CONSOLACION 2,281,200.00 - - - 3,100,000.00 - 4,518,800.00 500,000.00 - 500,000.00 - - - 1,600,000.00 12,500,000.00 CONSTRUCTION OF GREEN HOUSE 481,200.00 481,200.00 ESTABLISH FISH CAGES/PEN 300,000.00 300,000.00 COMMUNAL FISH POND 500,000.00 500,000.00 DAIRY PRODUCTION 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 3,100,000.00 3,100,000.00 RIPRAPPING - RIPRAPPING - RIPRAPPING - CONSTRUCTION OF DRAINAGE - RIPRAPPING - LEVEL III WATER SYSTEM EXPANSION - DIAGNOSIS AND MANAGEMENT TRAINING 18,600.00 18,600.00 NASH TRAINING 30,000.00 30,000.00 TRAINING FOR CERTIFIED REST APPLICATORS 7,600.00 7,600.00 TRAINING FOR BASIC LIFE SUPPORT 80,000.00 80,000.00 BEMDNC 150,000.00 150,000.00 CHT MOBILIZATION 120,000.00 120,000.00 LUNG MONTH CELEBRATION 6,000.00 6,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS NTP-MOP (DOTS TRAINING) 62,000.00 62,000.00 TRAINING FOR TDT ON STI CASE MGT. 24,600.00 24,600.00 TRAINING ON MANAGEMENT TO ANIMAL BITE VICTIMS 20,000.00 20,000.00 UPGRADE OF BHS - ACQUISITION OF MEDICAL EQUIPMENT 2,000,000.00 2,000,000.00 UPGRADE OF HEALTH FACILITIES 2,000,000.00 2,000,000.00 LIVELIHOOD PROJECT 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 ROAD IMPROVEMENT/ASPHALT 800,000.00 800,000.00 ROAD IMPROVEMENT/OVERLAY 800,000.00 800,000.00 974 CORDOVA 750,000.00 - - 2,015,000.00 1,000,000.00 - 3,635,000.00 - - 2,100,000.00 - - - 3,000,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD - - PAMO OR PAYAW| PURCHASE OF FISH NETS | PURCHASE OF MOTORIZED BOATS FOR CORDOVA MARINE WATCH 750,000.00 750,000.00 REPAIR AND REHABILITATION OF CLASSROOMS 1,515,000.00 1,515,000.00 ACCESS TO EDUCATION PROGRAMS: GULAYAN SA PAARALAN; TANA, ESKWELA TA!; KINHASON SA CORDOVA, MAPANGKWARTAHAN TA! 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 1,000,000.00 HEALTH FACILITIES & EQUIPMENT ENHANCEMENT PROGRAM 3,635,000.00 3,635,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICROENTERPRISE DEVELOPMENT 850,000.00 850,000.00 CAPACITY BUILDING AWARENESS TRAINING ON COOPERATIVISM | YOUTH PROGRAMS | PERSONS WITH DISABILITIES | SENIOR CITIZENS 500,000.00 500,000.00 REPAIR AND IMPROVEMENT OF SENIOR CITIZENS BUILDING 750,000.00 750,000.00 CONCRETING OF CORDOVA RORO PORT ROAD 3,000,000.00 3,000,000.00 975 DAANBANTAYAN 2,900,000.00 - - 1,600,000.00 10,500,000.00 - 3,000,000.00 - 1,200,000.00 1,300,000.00 - - - - 20,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - PURCHASE OF 1 UNIT TRACTOR; PURCHASE OF 2 UNITS CULTIVATOR/TILLER 1,500,000.00 1,500,000.00 COLD STORAGE FACILITIES - ESTABLISHMENT OF COLD STORAGE AND TRADING POST FACILITIES 400,000.00 400,000.00 TRADING POSTS - REHABILITATION OF TRADING POSTS 400,000.00 400,000.00 MARINE RESERVE AND FISH SANCTUARIES - TRAINING FOR PERSONNEL FOR MARINE PROTECTED AREAS MANAGEMENT 600,000.00 600,000.00 GULAYAN SA PAARALAN 700,000.00 700,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ ABOT-ALAM PROGRAM 900,000.00 900,000.00 VARIOUS DILG PROJECTS 10,500,000.00 10,500,000.00 EVACUATION FACILITY - CONSTRUCTION OF 1 UNIT STANDARD EVACUATION CENTER - RESCUE EQUIPMENT: PROCUREMENT OF DISASTER RESPONSE AND RESCUE EQUIPMENT SUCH AS AN ALL-TERRAIN DISASTER RESCUE VEHICLE, INFLATABLE BOATS, MEGAPHONES, SIRENS, PORTABLE GENERATOR SETS - RESCUE EQUIPMENT: PROCUREMENT OF EXPENDABLE ITEMS SUCH AS FIRE EXTINGUISHER, FLOOD LIGHT, CHAINSAW, AX, ROPES, LADDER, BREATHING APPARATUS, FLASHLIGHT - FLOOD CONTROL: CONSTRUCTION OF DRAINAGE SYSTEM - COMMUNITY HEALTH TEAM MOBILIZATION - TRAININGS AND DEPLOYMENT TO NHTS-PR FAMILIES 500,000.00 500,000.00 INFECTIOUS DISEASES - TRAINING FOR CERTIFIED PEST APPLICATORS 500,000.00 500,000.00 INFECTIOUS DISEASES - TRAINING FOR RHU PERSONNEL ON MANAGEMENT OF ANIMAL BITE VICTIMS, ORIENTATION OF ANIMAL BITE CENTER STAFF ON REVISED GUIDELINES ON MANAGEMENT OF ANIMAL BITES 500,000.00 500,000.00 INFECTIOUS DISEASES - TRAINING FOR RHU PERSONNEL ON THE ENHANCED CAPACITY OF LGUS IN RESPONDING TO EMERGENCIES AND DISASTERS 500,000.00 500,000.00 INFECTIOUS DISEASES - TRAINING FOR RHU PERSONNEL ON THE UPDATES ON DIAGNOSIS & TREATMENT MANAGEMENT; DOTS TRAINING FOR HEALTH PERSONNEL: NTP-MOP PPMD (DC 104 S. 2004) 500,000.00 500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS: BARATO NGA SINUGATAN SA DAANBANTAYAN 1,200,000.00 1,200,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1,300,000.00 1,300,000.00 976 DALAGUETE 8,000,000.00 - 1,000,000.00 - 5,250,000.00 - - - 1,000,000.00 4,000,000.00 - - 500,000.00 2,750,000.00 22,500,000.00 INFRASTRUCTURE SUPPORT TO FISHERY 500,000.00 500,000.00 CONSTRUCTION OF VEGETABLE TRADING POST 3,000,000.00 3,000,000.00 FISH CAGES FOR SUSTAINABLE AGRI-BASED LIVELIHOOD 500,000.00 500,000.00 ABACA PRODUCTION 500,000.00 500,000.00 COFFEE PRODUCTION 1,000,000.00 1,000,000.00 COCONUT PRODUCTION 500,000.00 500,000.00 ORGANIC VERMI COMPOSTING 1,000,000.00 1,000,000.00 FIBER CROPS PRODUCTION (SISAL, SIAPO AND MAGUEY) 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 VARIOUS WATER PROJECTS 5,250,000.00 5,250,000.00 PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - DALAGUETE BEACH PARK CO-MANAGEMENT PROGRAM 1,000,000.00 1,000,000.00 REPAIR/UPGRADING OF DAY CARE CENTERS 2,000,000.00 2,000,000.00 CONSTRUCTION OF WOMEN'S CRISIS CENTER 1,500,000.00 1,500,000.00 CAPABILITY BUILDING OF DCC, SNP AND PES WORKERS 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 2,750,000.00 2,750,000.00 CONCRETING OF LOCAL CORE ROAD - CONCRETING OF LOCAL CORE ROAD - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ACCESS ROAD-LANDING POINT FOR FISHERMEN - DALAGUETE STAR CENTER COMMUNITY BASED TRAINING 500,000.00 500,000.00 977 DANAO CITY 3,500,000.00 - 1,003,500.00 4,200,000.00 4,631,000.00 - 3,518,500.00 - - 3,947,000.00 - - - 3,700,000.00 24,500,000.00 MOTORIZED FISHING BOAT 1,000,000.00 1,000,000.00 MULTI - PURPOSE DRYING PAVEMENT 500,000.00 500,000.00 TRADING POSTS 500,000.00 500,000.00 MARINE RESERVES AND FISH SANCTUARIES 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 1,003,500.00 1,003,500.00 REPAIR/REHABILITATION OF SCHOOL BUILDINGS 4,200,000.00 4,200,000.00 REHABILITATION OF LEVEL III WATER SUPPLY SYSTEM 4,631,000.00 4,631,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,898,500.00 1,898,500.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 1,620,000.00 1,620,000.00 SUSTAINABLE LIVELIHOOD PROGRAM MICROENTERPRISE DEVELOPMENT 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM EMPLOYMENT FACILITATION TRACK 1,447,000.00 1,447,000.00 UPGRADING OF DAY CARE CENTERS 1,500,000.00 1,500,000.00 VARIOUS LGU PROJECTS 3,700,000.00 3,700,000.00 MAINTENANCE OF ROAD (ASPHALT OVERLAY) - INTEGRATED COMMUNITY FOOD PRODUCTION - CONCRETING OF ROAD - 978 DUMANJUG 4,500,000.00 - - 1,000,000.00 6,000,000.00 - - 1,000,000.00 - - - - 1,000,000.00 - 13,500,000.00 VARIOUS DA PROJECTS 4,500,000.00 4,500,000.00 INFRASTUCTURE SUPPORT TO AGRICULTURE PRODUCTION & DEVELOPMENT - PORT FOR AGRI-FISHERY PRODUCTS - ESTABLISHMENT OF A TRADING POST - REPAIR / REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 EVACUATION FACILITY 1,500,000.00 1,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 4,500,000.00 4,500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP 1,000,000.00 1,000,000.00 TECHNICAL VOCATIONAL TRAINING 1,000,000.00 1,000,000.00 979 GINATILAN - - - - 4,500,000.00 - 4,500,000.00 - - 900,000.00 - - 600,000.00 2,000,000.00 12,500,000.00 SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT (SALINTUBIG)- PROVISION OF POTABLE WATER SUPPLY 4,500,000.00 4,500,000.00 COMPLETION OF MUNICIPAL HEALTH CENTER 4,500,000.00 4,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 900,000.00 900,000.00 CONCRETING OF BARANGAY ROAD 2,000,000.00 2,000,000.00 SKILLS TRAINING DEVELOPMENT 600,000.00 600,000.00 980 LAPU-LAPU CITY (OPON) - - - 3,952,250.00 - - 4,000,000.00 3,240,000.00 - 5,910,000.00 2,298,750.00 - - 10,599,000.00 30,000,000.00 ABOT-ALAM PROGRAM FOR THE CHILDREN WITH SPECIAL NEEDS, GIFTED AND TALENTED 3,262,250.00 3,262,250.00 GULAYAN SA PAARALAN 690,000.00 690,000.00 CAPABILITY BUILDING OF HEALTH PERSONNEL 1,000,000.00 1,000,000.00 CONSTRUCTION OF BARANGAY HEALTH CENTER 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: 3. LIVELIHOOD TRAINING AND DEVELOPMENT PROGRAM FOR VULNERABLE SECTORS IN LAPULAPU CITY 1,640,000.00 1,640,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: 4.B. LAPULAPU CITY WOMEN LIVELIHOOD CENTER (LLC-WCL) 1,600,000.00 1,600,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: 4.A. LAPULAPU CITY WOMEN LIVELIHOOD CENTER (LLC-WCL) 3,000,000.00 3,000,000.00 4.1. CONSTRUCTION OF TWO (2) DAY CARE CENTERS AT P650,000.00 1,300,000.00 1,300,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: 1. KONKA FARMING PROJECT 1,610,000.00 1,610,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: 5. LIVELIHOOD AND ENTREPRENEURSHIP DEVELOPMENT TRAINING - PURCHASE OF EQUIPMENT 1,045,250.00 1,045,250.00 SUSTAINABLE LIVELIHOOD PROGRAM: 2. LAPU-LAPU CITY COMMUNITY BASED CREDIT AND MULTI-PURPOSE COOPERATIVE STRENGTHENING FOR VIABILITY AND SUSTAINABILITY 1,253,500.00 1,253,500.00 ROAD IMPROVEMENT 10,599,000.00 10,599,000.00 981 LILOAN 5,000,000.00 - - 7,500,000.00 - - - - - - - - - - 12,500,000.00 SUSTAINABLE LIVELIHOOD AND FOOD SECURITY PROGRAM 5,000,000.00 5,000,000.00 REPAIR AND REHABILITATION OF CLASSROOMS 7,500,000.00 7,500,000.00 982 MADRIDEJOS 2,400,000.00 - - - 7,160,000.00 - 1,440,000.00 - - - - - - 1,500,000.00 12,500,000.00 MARINE SANCTUARY REHABILITATION; MUNICIPAL NURSERY REHABILITATION; MULTIPURPOSE DRYING PAVEMENT (MPDP) 1,200,000.00 1,200,000.00 LIVELIHOOD PROJECTS (EXPANSION CATTLE, CARABAO DISPERSAL; GRAFTED MANGO SEEDLINGS; HOG RAISING; TRAINING ORGANIC FARMING & VERMICULTURE) 1,200,000.00 1,200,000.00 -CONSTRUCTION OF 2-STOREY DISASTER EVACUATION CENTER/ANNEX BLG. FOR ANNEX BLG. FOR 5 OFFICES, PHASE I 800,000.00 800,000.00 -PURCHASE OF RESCUE VEHICLE FOR MDRRMC 440,000.00 440,000.00 RESCUE EQUIPMENT: ACQUISITION AND ESTABLISHMENT OF EARLY WARNING DEVICE FOR CCA/MITIGATION & DISASTER PREPAREDNESS 2,880,000.00 2,880,000.00 ACQUISITION OF LOT FOR RELOCATION SITE 1,040,000.00 1,040,000.00 EXPANSION/IMPROVEMENT OF WATER SYSTEM LEVEL III 2,000,000.00 2,000,000.00 HFEP-CONSTRUCTION OF NEWSEPTIC VAULT FOR BIOHAZARD MATERIALS 1,440,000.00 1,440,000.00 LOCAL ACCESS ROAD 1,200,000.00 1,200,000.00 PROJECTS TO BE IDENTFIED 300,000.00 300,000.00 983 MALABUYOC 4,000,000.00 - - - 4,000,000.00 - - - - - - - - 4,500,000.00 12,500,000.00 COLD STORAGE FACILITY 1,200,000.00 1,200,000.00 INSFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTOR, PLANTER / SEEDER, SHELLER) 1,800,000.00 1,800,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 SALINTUBIG-PROVISION OF POTABLE WATER SUPPLY 4,000,000.00 4,000,000.00 CORE LOCAL ROAD CONSTRUCTION 4,500,000.00 4,500,000.00 984 MANDAUE CITY 7,000,000.00 - 5,000,000.00 - 2,500,000.00 2,000,000.00 - 1,000,000.00 - 9,500,000.00 - - 2,000,000.00 1,000,000.00 30,000,000.00 BACKYARD ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 COMMUNITY BASED ORGANIC FARMING 1,500,000.00 1,500,000.00 FOOD TERMINAL/TRADING POST 5,000,000.00 5,000,000.00 CONTINUATION OF THE BUTUANON RIVER REHABILITATION AND REGREENING PROGRAM 5,000,000.00 5,000,000.00 RESCUE VEHICLE (FOR DISASTER VICTIMS) CITY HEALTH AND CSWS 1,200,000.00 1,200,000.00 ORGANIZING/CAPABILITY BUILDING CSO INCLUDING EQUIPMENTS 1,300,000.00 1,300,000.00 RENEWABLE ENERGY ELECTRIFICATION PROGRAM 2,000,000.00 2,000,000.00 ENTERPRENEURIAL ENHANCEMENT - BUSINESS AND PRODUCT ENHANCEMENT 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAMS 3,000,000.00 3,000,000.00 ACQUISITION OF ASSISTIVE DEVICES 500,000.00 500,000.00 CRISIS CENTER FOR CHILDREN 6,000,000.00 6,000,000.00 PAKNAAN ACCESS ROAD (DEVELOPMENT) 1,000,000.00 1,000,000.00 CONTINUING AND EXPANSION OF THE VOC-TECH SKILLS TRAINING 2,000,000.00 2,000,000.00 985 MEDELLIN 3,500,000.00 - - - 1,500,000.00 - 2,500,000.00 500,000.00 - 4,500,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT SUCH AS TRACTOR, MOTORIZED FISHING BOATS AND FISH NETS 1,500,000.00 1,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,500,000.00 1,500,000.00 MARINE RESERVE AND FISH SANCTUARIES 500,000.00 500,000.00 EXPANSION OF WATER SYSTEM 1,500,000.00 1,500,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 UPGRADING OF HEALTH FACILITIES SUCH AS RURAL HEALTH CENTER AND BIRTHING CENTER 2,000,000.00 2,000,000.00 LIVELIHOOD PROGRAMS 500,000.00 500,000.00 VARIOS KC PROJECTS 4,000,000.00 4,000,000.00 UPGRADING OF DAY CARE CENTERS - CONSTRUCTION OF DAY CARE CENTERS - CONTINUOUS CAPACITY BUILDING OF DAY CARE WORKERS, CAPABILITY BUILDING OF SOCIAL WORKERS AND PROVISION OF ECCD LEARNING MATERIALS FOR DCCS 500,000.00 500,000.00 986 MINGLANILLA 1,500,000.00 - - 2,500,000.00 4,000,000.00 - - - - 1,000,000.00 - - - 5,500,000.00 14,500,000.00 INFRASTRUCTURE SUPPORT TO AGRI AND FISHERY PRODUCTION (MOTORIZED FISHING BOATS, FISH NETS) 500,000.00 500,000.00 ESTABLISHMENT OF MARINE SANCTUARY (BARANGAY TUNGKOP) 500,000.00 500,000.00 AGRI-FISHERY SUSTAINABILITY PROGRAM (CARABAO DISPERSAL /DRAFT ANIMAL) 500,000.00 500,000.00 REHABILITATION OF CLASSROOMS 2,500,000.00 2,500,000.00 VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 ESTABLISHMENT OF EVACUATION CENTER - UPGRADING AND REHABILITATION OF DRAINAGE SYSTEM - SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 UPGRADING OF DAY CARE CENTERS 500,000.00 500,000.00 CORE LOCAL ROAD PROJECT (ASPHALT OVERLAY) 5,500,000.00 5,500,000.00 987 MOALBOAL - - - 2,000,000.00 - - 500,000.00 - 3,500,000.00 1,000,000.00 - - - 5,500,000.00 12,500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 500,000.00 500,000.00 CONSTRUCTION OF TOURIST INFORMATION CENTER 3,500,000.00 3,500,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 1,000,000.00 1,000,000.00 ROAD REHABILITATION 5,500,000.00 5,500,000.00 988 OSLOB 7,000,000.00 - - - 5,500,000.00 - - - - - - - - - 12,500,000.00 SEED BANK 500,000.00 500,000.00 ENHANCEMENT OF SLAUGHTERHOUSE 500,000.00 500,000.00 FISH PORT 6,000,000.00 6,000,000.00 WATER SYSTEM-PHASE 1 5,500,000.00 5,500,000.00 989 PILAR 5,500,000.00 - - - 2,500,000.00 - 500,000.00 - - - - - - 4,000,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS 500,000.00 500,000.00 IMPROVEMENT OF PILAR WHARF 5,000,000.00 5,000,000.00 PROCUREMENT OF RESCUE EQUIPMENT 500,000.00 500,000.00 SALINTUBIG 2,000,000.00 2,000,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 CORE LOCAL ROAD 4,000,000.00 4,000,000.00 990 PINAMUNGAJAN 2,900,000.00 - 2,125,000.00 2,975,000.00 2,550,000.00 - 2,550,000.00 - - 2,550,000.00 850,000.00 - - - 16,500,000.00 PROCUREMENT OF MACHINERIES 503,000.00 503,000.00 PROCUREMENT OF MACHINERIES 59,500.00 59,500.00 PROCUREMENT OF MACHINERIES 76,500.00 76,500.00 PROCUREMENT OF MACHINERIES 306,000.00 306,000.00 PROCUREMENT OF MACHINERIES 680,000.00 680,000.00 MARINE RESERVE & FISH SANCTUARIES 850,000.00 850,000.00 SEAWEEDS CULTURE 425,000.00 425,000.00 NATIONAL GREENING PROGRAM (NGP) 595,000.00 595,000.00 NATIONAL GREENING PROGRAM (NGP) 510,000.00 510,000.00 NATIONAL GREENING PROGRAM (NGP) 510,000.00 510,000.00 NATIONAL GREENING PROGRAM (NGP) 510,000.00 510,000.00 REPAIR OF CLASSROOMS 2,694,500.00 2,694,500.00 GULAYAN SA PAARALAN 280,500.00 280,500.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 2,550,000.00 2,550,000.00 IMPROVEMENT OF RHU BUILDING 2,550,000.00 2,550,000.00 CONSTRUCTION OF DAY CARE CENTER 1,445,000.00 1,445,000.00 REPAIR OF DAY CARE CENTER 680,000.00 680,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PURCHASE OF ECC LEARNING MATERIALS 425,000.00 425,000.00 OTOP STORE 850,000.00 850,000.00 991 PORO 7,400,000.00 - 2,000,000.00 1,500,000.00 500,000.00 - - - - 1,100,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 7,400,000.00 7,400,000.00 BACKYARD PIGGERY - BACKYARD CATTLE FATTENING - MARINE PROTECTED AREAS - ORGANIC FERTILIZER PRODUCTION - UTANONAN SA TUGKARAN - IRRIGATION PROJECT - ACQUISITION OF REFRIGERATED VAN - UPLAND AND MANGROVE REHABILITATION 2,000,000.00 2,000,000.00 REPAIR OF KINDER/INDUSTRIAL ARTS CLASSROOMS 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 UPGRADE OF PAGSA WATERWORKS 500,000.00 500,000.00 REPAIR OF DAY CARE CENTER 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 600,000.00 600,000.00 992 RONDA - - - - 9,500,000.00 - 1,000,000.00 - - - - - - 2,000,000.00 12,500,000.00 PROCUREMENT OF RESCUE EQUIPMENT (BACKHOE) 9,500,000.00 9,500,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION (CONCRETE ROAD) 2,000,000.00 2,000,000.00 993 SAMBOAN 500,000.00 - - 1,000,000.00 2,500,000.00 - - - - - - - - 8,500,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATTION OF CLASSROOMS 800,000.00 800,000.00 EVACUATION FACILITY 2,500,000.00 2,500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 8,500,000.00 8,500,000.00 994 SAN FERNANDO 6,500,000.00 2,000,000.00 - - - - - - - 3,750,000.00 - - - - 12,250,000.00 REHABILITATION OF IRRIGATION SYSTEM 2,000,000.00 2,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 2,000,000.00 2,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE (NURSERY BANK) 2,000,000.00 2,000,000.00 ORGANIC FERTILIZER PRODUCTION 1,500,000.00 1,500,000.00 MARINE RESERVE AND FISH SANCTUARIES 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 2,750,000.00 2,750,000.00 995 SAN FRANCISCO 3,000,000.00 - - - 7,500,000.00 - - 2,000,000.00 - 1,000,000.00 - - - 4,000,000.00 17,500,000.00 HIGH VALUED COMMERCIAL DEVELOPMENT PROJECT (HVCDP) 1,000,000.00 1,000,000.00 LIVESTOCK DISPERSAL 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 SUSTAINABLE AGRO-FISHERY LIVELIHOOD PROJECT 500,000.00 500,000.00 CONSTRUCTION OF SAN FRANCISCO WATER SYSTEM LEVEL II (PHASE III) 7,500,000.00 7,500,000.00 SEWING BUSINESS FOR OUT OF SCHOOL YOUTH, YOUNG MOTHERS AND SINGLE PARENTS 2,000,000.00 2,000,000.00 REPAIR OF DAY CARE CENTER AND SUPEVISED NEIGHBORHOOD PLAYGROUNDS FACILITIES 1,000,000.00 1,000,000.00 ROAD CONCRETING 4,000,000.00 4,000,000.00 996 SAN REMIGIO 4,100,000.00 - 800,000.00 1,600,000.00 - - 1,600,000.00 1,000,000.00 1,000,000.00 2,200,000.00 400,000.00 - 1,800,000.00 - 14,500,000.00 VARIOUS DA PROJECTS 4,100,000.00 4,100,000.00 SOCIAL INFRA. & LOCAL CAPABILITY BUILDING (SILCAB) - LIVELIHOOD: MOTORIZED PUMP BOAT - PROCUREMENT OF TRACTOR - REHAB. CONSERVATION OF MPA - NATIONAL GREENIN' PROGRAM 800,000.00 800,000.00 REPAIR/REHABILITATION OF CLASSROOM 1,600,000.00 1,600,000.00 REPAIR OF BARANGAY HEALTH STATION 1,600,000.00 1,600,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 LOCAL TOURISM DEVELOPMENT 1,000,000.00 1,000,000.00 INFRASTRUCTURE PROJECT 1,500,000.00 1,500,000.00 CAPACITY BUILDING PROGRAM 300,000.00 300,000.00 SUSTAINBABLE LIVELIHOOD PROGRAM 400,000.00 400,000.00 SMALL INDUSTRY DEV'T. PROGRAM 400,000.00 400,000.00 TECH-VOC TRAINING, COMMUNITY-BASED TRAINING 1,800,000.00 1,800,000.00 997 SANTA FE 6,768,000.00 - - - 1,800,000.00 - - - - - - - - 3,932,000.00 12,500,000.00 CONSTRUCTION OF WHARF 1,800,000.00 1,800,000.00 CONSTRUCTION OF WHARF 2,250,000.00 2,250,000.00 GREENHOUSE PROJECT 1,044,000.00 1,044,000.00 IMPROVED GOAT PRODUCTION 1,026,000.00 1,026,000.00 DEMO ON ORGANIC FARMING 648,000.00 648,000.00 CONSTRUCTION OF EVACUATION CENTER 630,000.00 630,000.00 CONSTRUCTION OF EVACUATION CENTER 1,170,000.00 1,170,000.00 VARIOUS LGU PROJECTS 3,932,000.00 3,932,000.00 ROAD CONCRETING - ROAD CONCRETING - 998 SANTANDER 500,000.00 - - 100,000.00 5,500,000.00 - - - - - - - - 6,400,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 VARIOUS DILG PROJECTS 5,500,000.00 5,500,000.00 RESCUE EQUIPMENT - FLOOD CONTROL - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 6,400,000.00 6,400,000.00 999 SIBONGA - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CONCRETE ROAD 12,500,000.00 12,500,000.00 1000 SOGOD - - - - 7,000,000.00 - - - - - - - - 5,500,000.00 12,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 7,000,000.00 7,000,000.00 VARIOUS ROAD PROEJCTS 5,500,000.00 5,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS LOCAL CORE ROAD - LOCAL CORE ROAD - LOCAL CORE ROAD - LOCAL CORE ROAD - LOCAL CORE ROAD - 1001 TABOGON - - - - 10,500,000.00 - - 2,000,000.00 - - - - - - 12,500,000.00 UPGADING OF WATER SYSTEM 10,500,000.00 10,500,000.00 SWINE FATTENING 2,000,000.00 2,000,000.00 1002 TABUELAN 1,000,000.00 - - - 6,275,000.00 - 2,225,000.00 - - 1,000,000.00 - - 2,000,000.00 - 12,500,000.00 PROCUREMENT OF ORGANIC AND FERTILIZER 500,000.00 500,000.00 PURCHASE OF CARABAO AND PLOWSET 500,000.00 500,000.00 CONSTRUCTION OF WATER SYSTEM (RESERVOIR, PIPELINE) 6,275,000.00 6,275,000.00 PURCHASE OF MEDICAL EQUIPMENTS (BP, DETECTO WEIGHING SCALE, INFANTOMETER, NEBULIZER, DIGITAL THERMOMETER, GLUCOMETER 3 IN 1) 1,025,000.00 1,025,000.00 UPGRADING OF HEALTH FACILITIES 1,200,000.00 1,200,000.00 LIVELIHOOD PROGRAM AND CAPACITY BUILDING FOR WOMEN AND OSY 500,000.00 500,000.00 LIVELIHOOD PROGRAM AND CAPACITY BUILDING FOR WOMEN AND OSY 500,000.00 500,000.00 PROCUREMENT OF EQUIPMENTS & TRAINING OF TRAINORS FOR THE TESDA TRAINING CENTER 2,000,000.00 2,000,000.00 1003 TOLEDO CITY - - - - 30,000,000.00 - - - - - - - - - 30,000,000.00 PROVISION OF POTABLE WATER SUPPLY 30,000,000.00 30,000,000.00 1004 TUBURAN 3,700,000.00 - - 2,500,000.00 5,500,000.00 - - - - 1,500,000.00 700,000.00 - - 2,600,000.00 16,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (SHREDDER, CORN SHELLER, HAND TRACTOR, MOTORIZED FISHING BOATS, FISH NETS) 1,850,000.00 1,850,000.00 POST HARVEST FACILITIES & EQUIPMENT (MECHANICAL DRYER) 850,000.00 850,000.00 COLD STORAGE FACILITIES/VANS 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM 500,000.00 500,000.00 EVACUATION FACILITY 3,000,000.00 3,000,000.00 SALINTUBIG 2,500,000.00 2,500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF CICL HOLDING CENTER) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 YAMAN PINOY (SOAP MAKING) 700,000.00 700,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 600,000.00 600,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION - CONSTRUCTION OF FOOT BRIDGE 2,000,000.00 2,000,000.00 1005 TUDELA 2,000,000.00 - 500,000.00 - 5,500,000.00 - 1,000,000.00 - - 3,000,000.00 500,000.00 - - - 12,500,000.00 POVERTY REDUCTION PROGRAM: (LIVELIHOOD/TRAININGS) 2,000,000.00 2,000,000.00 MUNICIPAL GREENING PROGRAM 500,000.00 500,000.00 SALINTUBIG 5,500,000.00 5,500,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 45,000.00 45,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 85,000.00 85,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 21,000.00 21,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 12,000.00 12,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 231,000.00 231,000.00 HEALTH FACILITIES ENHANCEMENT AND EQUIPPING 400,000.00 400,000.00 HEALTH FACILITIES ENHANCEMENT AND EQUIPPING 206,000.00 206,000.00 EVACUATION CENTER 2,000,000.00 2,000,000.00 SENIOR CITIZEN, WOMEN, PWDS AND CHILD PROTECTION CENTER 1,000,000.00 1,000,000.00 YAMAN PINOY 500,000.00 500,000.00 NEGROS ORIENTAL PROVINCE 74,259,067.41 12,020,000.00 7,680,000.00 12,401,644.14 101,154,156.00 - 34,233,527.55 11,150,544.00 6,372,200.00 42,470,167.05 3,915,000.00 9,111,000.00 1,000,000.00 63,629,856.85 379,397,163.00 1006 AMLAN (AYUQUITAN) 1,060,000.00 - 1,080,000.00 1,230,000.00 2,500,000.00 - 2,130,000.00 - 1,000,000.00 2,000,000.00 1,500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,060,000.00 1,060,000.00 ESTABLISHMENT OF DAIRY CATTLE MILK COLLECTION AND PROCESSING CENTER - CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT - PURCHASE OF RICE THRESHER - ORGANIC FERTILIZER PRODUCTION - ESTABLISHMENT OF SUSTAINABLE LIVELIHOOD ENTERPRISE FOR FISHERFOLKS - MANAGEMENT OF FORESTLANDS AND WATERSHED DEVELOPMENT IN SUPPORT TO THE NATIONAL GREENING PROGRAM 1,080,000.00 1,080,000.00 REHABILITATION/REPAIR OF AMLAN NATIONAL HIGH SCHOOL, SHOP AND HOME ECONOMICS BUILDING 730,000.00 730,000.00 ABOT-ALAM PROGRAM 500,000.00 500,000.00 EVACUATION FACILITY 1,000,000.00 1,000,000.00 IMPROVEMENT OF WATER SUPPLY SYSTEM 1,500,000.00 1,500,000.00 MATERNAL, NEONATAL, CHILDHEALTH AND NUTRITION 630,000.00 630,000.00 REPAIR AND REHABILITATION OF BARANGAY HEALTH STATIONS (BHS) 1,500,000.00 1,500,000.00 TOURISM SITE DEVELOPMENT PROJECT 1,000,000.00 1,000,000.00 CONSTRUCTION OF CRISIS CENTER 2,000,000.00 2,000,000.00 YAMAN PINOY 1,500,000.00 1,500,000.00 1007 AYUNGON 500,000.00 - - 500,000.00 3,720,000.00 - 2,500,000.00 - - 2,280,000.00 - - - 5,000,000.00 14,500,000.00 SOCIAL INFRASTRUCTURE & LOCAL CAPABILITY BLDG. (SILCAB) - INSTITUTIONAL DEVELOPMENT INTERVENTIONS FOR AGRARIAN REFORM BENEFICIARIES AND SMALL FARMERS IN AYUNGON ARC 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 FLOOD CONTROL (ANHS GROUNDS AND TAMPOCON II) 500,000.00 500,000.00 VARIOUS WATER PROJECTS 3,220,000.00 3,220,000.00 SALINTUBIG - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF BRGY. HEALTH STATION AT BRGY. TIBYAWAN 2,500,000.00 2,500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF DAY CARE CENTERS) 1,200,000.00 1,200,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (REPAIR/UPGRADING OF DAY CARE CENTERS) 1,080,000.00 1,080,000.00 CORE LOCAL ROAD CONCRETING 5,000,000.00 5,000,000.00 1008 BACONG 1,000,000.00 - - 800,000.00 6,000,000.00 - 500,000.00 - - 1,000,000.00 - - - 3,200,000.00 12,500,000.00 CATTLE FATTENING PROGRAM 1,000,000.00 1,000,000.00 REPAIR OF 3-CLASSROOMS IN BUNTOD ELEMENTARY SCHOOL 800,000.00 800,000.00 CONSTRUCTION OF DIKE AT LAWIGAN RIVER IN TUBOD 3,000,000.00 3,000,000.00 EXPANSION OF WATERWORKS SYSTEM 3,000,000.00 3,000,000.00 RABIES ELIMINATION PROGRAM 500,000.00 500,000.00 SEA-KAUNLARAN PROGRAM 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 2,200,000.00 2,200,000.00 CONCRETING OF MABINI ST. IN SOUTH POBLACION - CONCRETING OF MARTIREZ ST. IN SOUTH POBLACION - CONCRETING OF ARELLANO ST. IN SOUTH POBLACION TO WEST POBLACION - CONCRETING OF LARENA ST. IN NORTH POBLACION - CONCRETING OF E. VILLANUEVA ST. IN WEST POBLACION - CONCRETING OF BONIFACIO ST. IN NORTH POBLACION - CONCRETING OF DE LA PAZ ST. IN NORTH POBLACION - CONCRETING OF CATHOLIC CEMETERY ACCESS ROAD 1,000,000.00 1,000,000.00 1009 BAIS CITY 7,785,000.00 - 1,000,000.00 - - - 1,300,000.00 - - 3,200,000.00 1,715,000.00 - 1,000,000.00 1,500,000.00 17,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,850,000.00 1,850,000.00 AGRI-FISHERY TRAININGS 150,000.00 150,000.00 MARINE RESERVE AND FISH SANCTUARIES 820,000.00 820,000.00 IRRIGATION PROJECT 1,800,000.00 1,800,000.00 SUSTAINABLE AGRI-FISHERY-BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,600,000.00 1,600,000.00 FARM IMPLEMENTS/TOOLS 1,565,000.00 1,565,000.00 NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 300,000.00 300,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICROENTERPRISE DEVELOPMENT TRACK 3,200,000.00 3,200,000.00 YAMAN PINOY 1,715,000.00 1,715,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION 1,500,000.00 1,500,000.00 TECHNICAL VOCATION TRAINING/COMMUNITY BASED TRAINING 1,000,000.00 1,000,000.00 1010 BASAY 6,830,000.00 - - 170,000.00 500,000.00 - - 1,000,000.00 - - - - - 4,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 6,330,000.00 6,330,000.00 IRRIGATION PROJECT - ORGANIC FERTILIZER PRODUCTION - TRADING POST/SATELITE MARKET - POST-HARVEST FACILITIES AND EQUIPMENTS - POST-HARVEST FACILITIES AND EQUIPMENTS - COLD STORAGE FACILITY - MARINE RESERVE AND FISH SANCTUARY 500,000.00 500,000.00 MARINE PROTECTED AREA - GULAYAN SA PAARALAN 170,000.00 170,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 ACQUISITION OF RAWMATERIALS -COCO SHELL CRAFT PRODUCTION AND 500,000.00 500,000.00 ACQUISITION OF RAWMATERIALS -UDYONG SOFT BROOM PRODUCTION 500,000.00 500,000.00 CORE LOCAL ROAD PROJECTS 4,000,000.00 4,000,000.00 1011 BINDOY (PAYABON) 2,397,163.00 - - 320,000.00 1,600,000.00 - 1,840,000.00 - - 2,030,000.00 - - - 3,710,000.00 11,897,163.00 FADS WITH PUMPBOAT 1,600,000.00 1,600,000.00 CONSTRUCTION OF FISH LANDING PORT (WHARF) 797,163.00 797,163.00 GULAYAN SA PAARALAN 320,000.00 320,000.00 ADDITIONAL SOURCES OF WATER SUPPLY 800,000.00 800,000.00 WATER SYSTEM IN CLUSTER BARANGAYS 800,000.00 800,000.00 HIRING OF ADDITIONAL RHMPP, RSI, DENTIST 1,840,000.00 1,840,000.00 VARIOUS KC PROJECTS 2,030,000.00 2,030,000.00 CONSTRUCTION OF DAY CARE CENTER CUM EVACUATION CENTER - CONSTRUCTION OF DAY CARE CENTER - CONSTRUCTION OF DAY CARE CENTER - INTEGRATED COMMUNITY FOOD PRODUCTION 400,000.00 400,000.00 VARIOUS ROAD PROJECTS 3,310,000.00 3,310,000.00 CORE LOCAL ROAD CONSTRUCTION AT SITIO PROPER, BARANGAY CABCABAN, BINDOY - CONSTRUCTION OF CORE LOCAL ROAD CONSTRUCTION AT SITIO NAULAAN, BRGY. DANAWAN - CORE LOCAL ROAD CONSTRUCTION AT SITIO CAMBIHOD BRGY. TINAOGAN - CORE LOCAL ROAD CONSTRUCTION AT SITIO KONG-KONG BRGY. TUBOD - CONSTRUCTION OF CONNECTING LOCAL ROAD BRGY. MATOBATO TO BRGY. TINAOGAN - 1012 CANLAON CITY 4,550,000.00 - - - 1,750,000.00 - - - 2,000,000.00 1,200,000.00 - - - 3,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 3,150,000.00 3,150,000.00 2 UNITS FARM TRACTOR - ORGANIC FERTILIZER 800,000.00 800,000.00 IMPROVEMENT AND REHABILITATION OF SLAUGHTER HOUSE FACILITIES 600,000.00 600,000.00 VARIOUS WATER PROJECTS 1,750,000.00 1,750,000.00 PROVISION OF POTABLE WATER SUPPLY - DEVELOPMENT OF TOURISM INFORMATION CENTER 2,000,000.00 2,000,000.00 MICRO-ENTERPRISE 1,200,000.00 1,200,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORE ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION 3,000,000.00 3,000,000.00 1013 CITY OF BAYAWAN (TULONG) 3,200,000.00 6,520,000.00 - - 13,800,000.00 - - 5,440,000.00 - 1,040,000.00 - - - - 30,000,000.00 REHAB & EXTENSION OF LINE CANAL FOR MANTAPI-CANSIG-ID IRRIGATION SYSTEM 3,912,000.00 3,912,000.00 REHAB & EXTENSION OF LINE CANAL FOR BUFIA IRRIGATION SYSTEM 2,608,000.00 2,608,000.00 SMALL WATER IMPOUNDING 3,200,000.00 3,200,000.00 PROPOSED HANGING TRUNKLINE (FOOTBRIDGE) FOR SITIO DAMIG, KALAMTUKAN & SITIO BAONG KALUMBOYAN 1,200,000.00 1,200,000.00 VARIOUS DILG PROJECTS 11,320,000.00 11,320,000.00 MOTORIZED FLAT BOTTOM BOAT FOR RESCUE - FLOOD CONTROL (MALABUGAS & CAMBULO) - BOX CULVERT - RESCUE VEHICLE INTENDED FOR PWDS & SENIOR CITIZEN - DAUIS PUBLIC MARKET WITH TRANSPORT TERMINAL - REHAB. OF POTABLE WATER SUPPLY SYSTEM SITIO BALASTRO, TOWER & PULANG YUTA, KALAMTUKAN 800,000.00 800,000.00 IMPROVEMENTS OF BANAYBANAY WATER SUPPLY SYSTEM 480,000.00 480,000.00 MACHINERY FOR COCONUT BY-PRODUCTS PROCESSING (DECORTICATOR, WEAVER, ETC.) PRODUCTION 1,200,000.00 1,200,000.00 WORKING ANIMALS 1,600,000.00 1,600,000.00 LIVELIHOOD ASSISTANCE 2,640,000.00 2,640,000.00 CONST. OF DAYCARE CENTER TALAO, SAN ISIDRO 640,000.00 640,000.00 REPAIR/REHAB. OF DAYCARE LAPAY, DAWIS 400,000.00 400,000.00 1014 CITY OF GUIHULNGAN 5,200,000.00 - - - 6,500,000.00 - 2,600,000.00 - - 5,700,000.00 - 2,500,000.00 - 5,000,000.00 27,500,000.00 IRRIGATION PROJECT (SIP) 1,800,000.00 1,800,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE 600,000.00 600,000.00 POST HARVEST FACILITIES & EQUIPMENT 1,800,000.00 1,800,000.00 MARINE RESERVE AND FISH SANCTUARIES 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF FLOOD CONTROL DIKE - CONSTRUCTION OF EVACUATION CENTER - UPGRADING OF WATERWORKS SYSTEM 2,500,000.00 2,500,000.00 COMMUNITY HEALTH TEAM 1,000,000.00 1,000,000.00 HEALTH EMERGENCY MANAGEMENT 1,000,000.00 1,000,000.00 STI/HIV & AIDS PREVENTION 600,000.00 600,000.00 CRISIS CENTER 3,000,000.00 3,000,000.00 DAY CARE CENTER 800,000.00 800,000.00 CAPABILITY BUILDING OF DAY CARE WORKER 500,000.00 500,000.00 EARLY CHILDHOOD CARE DEVT LEARNING KITS 600,000.00 600,000.00 HYGIENE KITS 800,000.00 800,000.00 CORE LOCAL ROADS 5,000,000.00 5,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 2,500,000.00 2,500,000.00 1015 CITY OF TANJAY 5,000,000.00 - 500,000.00 - 3,900,000.00 - 500,000.00 - - - - - - 3,600,000.00 13,500,000.00 PRE/POST-HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT) 4,000,000.00 4,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS : 1. LIVELIHOOD ACTIVITIES FOR FARMERS (CROP DIVERSIFICATION/SALT PROJ.-PHP 500,000 FOR FARMERS) 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS: 2. LIVELIHOOD ACTIVITIES FOR FISH FARMERS (UPLAND FRESHWATER PRODUCTION/FISHING GEARS PROCUREMENT -PHP 500,000 FOR FISH FARMERS) 500,000.00 500,000.00 NATIONAL GREENING PROGRAM (NGP) 500,000.00 500,000.00 FLOOD CONTROL - CONSTRUCTION OF 300-METER SEAWALL 2,900,000.00 2,900,000.00 SAGANA AT LIGTAS NA TUBIG (SALINTUBIG)-PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 1,000,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,100,000.00 1,100,000.00 CORE LOCAL ROAD CONCRETING A. NUEVO -PAL-EWROAD-L=240 L.M. 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONCRETING B. CONCRETING OF PAL-EWTO STO. NINO NIO ROAD-L=200 L.M. 500,000.00 500,000.00 1016 DAUIN - - - - 7,000,000.00 - - 1,000,000.00 - - - - - 4,500,000.00 12,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) REHABILITATION AND IMPROVEMENT OF WATERWORKS SYSTEM 7,000,000.00 7,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): TULONG PANGKABUHAYAN PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) - BACKYARD CATTLE FATTENING PROJECT 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 4,500,000.00 4,500,000.00 CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION - 1017 DUMAGUETE CITY 500,000.00 - 600,000.00 2,000,000.00 5,400,000.00 - 1,500,000.00 1,000,000.00 - 1,500,000.00 - - - - 12,500,000.00 UPLAND FISHERIES PROJECT 500,000.00 500,000.00 URBAN GREENING PROJECT 600,000.00 600,000.00 REPAIR/REHABILITATION OF CLASSROOMS 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 VARIOUS DILG PROJECTS 3,900,000.00 3,900,000.00 FLOOD CONTROL PROJECT - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BANICA RIVER - CONSTRUCTION OF EVACUATION FACILITY IN DUMAGUETE CITY HIGH SCHOOL COMPOUND - PURCHASE OF RESCUE VEHICLE 1,000,000.00 1,000,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 INFECTIOUS DISEASES - DENGUE CONTROL 500,000.00 500,000.00 INFECTIOUS DISEASES - RABIES ELIMINATION 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 OFWS REINTEGRATION PROGRAM 500,000.00 500,000.00 MICRO FINANCING AND LIVELIHOOD PROGRAMS A. DRESS MAKING AND TAILORING PROGRAM FOR PARENTS OF PANTAWID CHILDREN MEMBERS 500,000.00 500,000.00 MICRO FINANCING AND LIVELIHOOD PROGRAMS B. FOOD PROCESSING PROGRAM FOR G-WAVE CLIENTS AND VAWVICTIMS 500,000.00 500,000.00 MICRO FINANCING AND LIVELIHOOD PROGRAMS C. FOOD PROCESSING AND BAG-MAKING PROGRAM FOR KALIPI IN 24 BARANGAYS 500,000.00 500,000.00 1018 JIMALALUD 5,000,000.00 - 600,000.00 770,000.00 3,500,000.00 - - - - 1,500,000.00 - - - 1,130,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 FARM IMPLEMENTS/TOOLS 500,000.00 500,000.00 PORTS AND WHARVES (PHASE II) 2,500,000.00 2,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 500,000.00 500,000.00 MARINE RESERVE AND FISH SANCTUARIES 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 600,000.00 600,000.00 GULAYAN SA PAARALAN 270,000.00 270,000.00 ABOT-ALAM PROGRAM 500,000.00 500,000.00 SALINTUBIG 3,500,000.00 3,500,000.00 PROTECTIVE SERVICES CAPACITY BUILDING 500,000.00 500,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS 1,000,000.00 1,000,000.00 VARIOUS ROAD PROJECTS 1,130,000.00 1,130,000.00 LOCAL ACCESS ROAD - LOCAL ACCESS ROAD - 1019 LA LIBERTAD 1,305,104.41 - - 3,689,644.14 - - 956,527.55 - - 2,088,167.05 - - - 4,460,556.85 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 1,305,104.41 1,305,104.41 BASIC EDUCATION FACILITIES (REPAIR OR REHABILITATION OF CLASSROOMS) 3,689,644.14 3,689,644.14 HEALTH FACILITIES ENHANCEMENT PROGRAM (RHU EQUIPMENTS OPB MCP & TB DOTS) 956,527.55 956,527.55 PROTECTIVE SERVICES (CONSTRUCTION OF DAY CARE CENTER) 2,088,167.05 2,088,167.05 INTEGRATED COMMUNITY FOOD PRODUCTION 2,110,208.82 2,110,208.82 CORE LOCAL ROAD CONST/MAINTENANCE/REHABILITATION 2,350,348.03 2,350,348.03 1020 MABINAY 3,850,000.00 - - 500,000.00 5,000,000.00 - 2,500,000.00 - - 1,150,000.00 - 4,500,000.00 - 6,000,000.00 23,500,000.00 AGRI INLAND FISHERY/LIVELIHOOD TRAININGS 550,000.00 550,000.00 FARM IMPLEMENTS/TOOLS 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT AND AVAILMENT OF WEIGHING SCALE 800,000.00 800,000.00 ORGANIC FERTILIZER PRODUCTION 2,000,000.00 2,000,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 SALINTUBIG 5,000,000.00 5,000,000.00 BIRTHING FACILITIES 1,950,000.00 1,950,000.00 HEALTH ENHANCEMENT FACILITY 550,000.00 550,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - EMPLOYMENT FACILITATION TRACK 500,000.00 500,000.00 ECCD - RESOURCE CENTER 650,000.00 650,000.00 VARIOUS ROAD PROJECTS 6,000,000.00 6,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 4,500,000.00 4,500,000.00 1021 MANJUYOD - - - - 5,799,256.00 - - 710,544.00 - - - - - 5,990,200.00 12,500,000.00 IMPROVEMENT OF DRAINAGE SYSTEM 1,693,083.00 1,693,083.00 VARIOUS DILG PROJECTS 4,106,173.00 4,106,173.00 CONSTRUCTION OF FLOOD CONTROL - CONSTRUCTION OF FLOOD CONTROL - SPECIAL RECRUITMENT ACTIVITY 710,544.00 710,544.00 CONCRETING OF 0.450 KM FROM SITIO CAGUIHAYAN TO BARANGAY PROPER LOCAL ROAD 1,884,725.00 1,884,725.00 IMPROVEMENT OF 0.400 KM, SITIO CAMBUHING LOCAL ROAD 1,969,902.00 1,969,902.00 CONCRETING OF 0.400 KM FROM SITIO TAKAY TO SITIO PAGTAYUAN LOCAL ROAD 2,135,573.00 2,135,573.00 1022 PAMPLONA 1,000,000.00 - - - 6,916,900.00 - - - - 376,000.00 700,000.00 - - 3,507,100.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 FLOOD CONTROL - CONSTRUCTION OF GABIONS 2,749,000.00 2,749,000.00 SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY 4,167,900.00 4,167,900.00 PROTECTIVE SERVICES -INFRASTRUCTURE PROJECTS 376,000.00 376,000.00 YAMAN PINOY 700,000.00 700,000.00 CORE LOCAL ROAD CONSTRUCTION 3,507,100.00 3,507,100.00 1023 SAN JOSE 2,000,000.00 - - - 2,600,000.00 - 2,400,000.00 - - 2,500,000.00 - - - 3,000,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 1,000,000.00 1,000,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 500,000.00 500,000.00 ORGANIC FARMING PROJECT 500,000.00 500,000.00 IMPROVEMENT OF EVACUATION FACILITY 600,000.00 600,000.00 IMPROVEMENT OF EVACUATION FACILITY 500,000.00 500,000.00 IMPROVEMENT OF EVACUATION FACILITY 500,000.00 500,000.00 REHABILITATION/UPGRADING OF LEVEL III WATER SUPPLY SYSTEM, INCLUDING WATER TREATMENT 1,000,000.00 1,000,000.00 COMPLETION OF BARANGAY HEALTH STATION 700,000.00 700,000.00 COMPLETION OF BARANGAY HEALTH STATION 700,000.00 700,000.00 EXPANSION OF BIRTHING CENTER 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICROENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DCCS 500,000.00 500,000.00 CONCRETING OF TAPON NORTE - BASIAO ROAD - VARIOUS ROAD PROJECTS 3,000,000.00 3,000,000.00 CONSTRUCTION OF NAUPAK ROAD - CONCRETING OF SIAPO-GUILUNGSORAN ROAD - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONCRETING OF CANCAWAS ROAD - CONCRETING OF TAPON NORTE - BASAK ROAD - 1024 SANTA CATALINA 2,685,000.00 - 3,400,000.00 - 2,550,000.00 - 2,615,000.00 - - 3,750,000.00 - - - 3,500,000.00 18,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,385,000.00 1,385,000.00 INFRASTRUCTURAL SUPPORT TO AGRI. AND FISHERY PRODUCTION AND DEV'T. (RICE MILL) 550,000.00 550,000.00 INDIGENOUS PRODUCTION OF ORGANIC FERTILIZER 750,000.00 750,000.00 NATIONAL GREENING PROGRAM 3,400,000.00 3,400,000.00 CONSTRUCTION OF 1 UNIT STANDARD EVACUATION CENTER (WITH TOILETS FOR MEN, WOMEN & PWDS) 550,000.00 550,000.00 SAGANA AT LIGTAS NA TUBIG (SALINTUBIG) 2,000,000.00 2,000,000.00 BINOCULAR MICROSCOPE 100,000.00 100,000.00 CONSTRUCTION OF 1 UNIT BHS 864,000.00 864,000.00 DENTAL CHAIR AND ACCESSORIES 300,000.00 300,000.00 DRESSING CARRIAGE (28 PCS.) 322,000.00 322,000.00 EMERGENCY LAMP (2 PCS.) 2,800.00 2,800.00 GOOZENECK LAMP (4 PCS.) 20,000.00 20,000.00 HEMATOLOGY ANALYZER 700,000.00 700,000.00 MAYO STAND (28 PCS.) 126,000.00 126,000.00 MICRO HEMATOCRIT CENTRIFUGE 35,000.00 35,000.00 PERMITRIN 1 LITER 15,200.00 15,200.00 PORTABLE O2 TANK (3 PCS.) 60,000.00 60,000.00 STRETCHER (2) 70,000.00 70,000.00 CONSTRUCTION OF DCC 750,000.00 750,000.00 COMMUNITY-BASED LIVELIHOOD DEVELOPMENT PROJECT FOR PANTAWID PAMILYA PHASE I 3,000,000.00 3,000,000.00 VARIOUS LGU PROJECTS 3,500,000.00 3,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION - 1025 SIATON 6,429,000.00 3,000,000.00 - 2,000,000.00 2,731,000.00 - 4,540,000.00 - - 3,800,000.00 - - - - 22,500,000.00 CONSTRUCTION OF IRRIGATION SYSTEM 3,000,000.00 3,000,000.00 ACQUISITION OF MOTORIZED FISHING BOATS AND FISH NETS 1,429,000.00 1,429,000.00 CONSTRUCTION OF SLAUGHTERHOUSE 5,000,000.00 5,000,000.00 REPAIR/REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 REPAIR/REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 VARIOUS WATER PROJECTS 2,731,000.00 2,731,000.00 SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY - CONSTRUCTION OF BARANGAY HEALTH STATION 3,000,000.00 3,000,000.00 REPAIR OF FOUR (4) BHS AT MALABUHAN, SIIT TAYAK & SAN JOSE 1,540,000.00 1,540,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICROENTERPRISE DEVELOPMENT TRACK 2,300,000.00 2,300,000.00 1026 SIBULAN 5,187,800.00 - - - - - 5,130,000.00 - 832,200.00 1,350,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 5,187,800.00 5,187,800.00 SOCIAL INFRASTRUCTURE BUILDING AND STRENGTHENING - ESTABLISHMENT OF HYDRAULIC RAM PUMP AND WATER RESERVOIRS WITH DISTRIBUTION PIPES - MOTORIZED FISHING PUMP BOAT - PURCHASE OF DECORTICATING MACHINE FOR COCO COIR/FIBER AND COCOPEAT PRODUCTION - CONSTRUCTION OF BARANGAY HEALTH STATION AND BIRTHING FACILITY 2,500,000.00 2,500,000.00 PURCHASE OF MATERIALS AND EQUIPMENT FOR BARANGAY HEALTH STATION AND BIRTHING FACILITY 2,030,000.00 2,030,000.00 TRAINING OF PERSONNEL FOR BARANGAY HEALTH STATION AND BIRTHING FACILITY 600,000.00 600,000.00 CONSTRUCTION OF SIBULAN MULTI-PURPOSE HALL WITH FUNCTION HALL AND ACCOMODATION FACILITY PHASE II 832,200.00 832,200.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO ENTERPRISES DEVELOPMENT 1,350,000.00 1,350,000.00 1027 TAYASAN 2,900,000.00 - - - 6,800,000.00 - 2,800,000.00 - - - - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 700,000.00 700,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 2,200,000.00 2,200,000.00 COMPLETION OF THE CONSTRUCTION OF THE TAYASAN PUBLIC MARKET 5,500,000.00 5,500,000.00 CAPABILITY BUILDING FOR CSOS 1,300,000.00 1,300,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 PROVISION OF EQUIPMENT UNDER HFEP 800,000.00 800,000.00 1028 VALENCIA 3,960,000.00 2,500,000.00 - - - - - - 2,540,000.00 3,500,000.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,560,000.00 1,560,000.00 AGRI-INFRASTRUCTURE SUPPORT - PURCHASE OF TRACTOR 2,400,000.00 2,400,000.00 IRRIGATION SYSTEM/AGRI WATER SUPPLY 2,500,000.00 2,500,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS 2,540,000.00 2,540,000.00 CONSTRUCTION OF 4 DAY CARE CENTERS 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 1,500,000.00 1,500,000.00 1029 VALLEHERMOSO 1,420,000.00 - - 422,000.00 5,087,000.00 - 422,000.00 - - 506,000.00 - 2,111,000.00 - 2,532,000.00 12,500,000.00 MARINE RESERVE AND FISH SANCTUARY 420,000.00 420,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES: REPAIR REHABILITATION OF CLASSROOMS 422,000.00 422,000.00 VARIOUS DILG PROJECTS 3,822,000.00 3,822,000.00 CAPABILITY BUILDING FOR CSOS - FLOOD CONTROL - CONSTRUCTION OF SEA WALL ALONG POBLACION NORTHERN COASTAL AREA - PROVISION OF POTABLE WATER SUPPLY 675,000.00 675,000.00 PROVISION OF POTABLE WATER SUPPLY 590,000.00 590,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 422,000.00 422,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 506,000.00 506,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,266,000.00 1,266,000.00 REHABILITATION OF MALANGSA LOCAL ROAD (CONCRETING) 1,266,000.00 1,266,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 2,111,000.00 2,111,000.00 1030 ZAMBOANGUITA 500,000.00 - 500,000.00 - 7,500,000.00 - - 2,000,000.00 - 2,000,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 VARIOUS DILG PROJECTS 7,500,000.00 7,500,000.00 FLOOD RIVER CONTROL - IMPROVEMENT AND EXPANSION PROVISION OF POTABLE WATER SUPPLY - INTEGRATED LIVELIHOOD PROGRAM FOR DISADVANTAGED WORKERS 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM AND MICROENTERPRISE 2,000,000.00 2,000,000.00 SIQUIJOR PROVINCE 12,470,000.00 - - 9,385,004.00 25,473,600.00 - 6,506,400.00 - - 7,900,000.00 500,000.00 - 750,000.00 12,020,000.00 75,005,004.00 1031 ENRIQUE VILLANUEVA 1,400,000.00 - - 1,040,000.00 5,253,600.00 - 1,106,400.00 - - 1,000,000.00 - - - 2,700,000.00 12,500,000.00 PROVISION OF MOTORIZED FISHING BOATS AND FISH NETS IN SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT 1,400,000.00 1,400,000.00 REHABILITATION OF FIVE (5)SCHOOLS IN THE MUNICIPALITY 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN OF THE FOUR (4) ELEMENTARY SCHOOLS IN THE MUNICIPALITY OF ENRIQUE VILLANUEVA 40,000.00 40,000.00 INSTALLATION OF DRRM RADIO COMMUNICATION SYSTEM 700,000.00 700,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) 3,193,600.00 3,193,600.00 CAPABILITY BUILDING 500,000.00 500,000.00 ESTABLISHMENT OF INTERNET COMMUNICATION FACILITY AND ESTABLISHMENT OF LOCAL ACCESS NETWORK WITH WI - FI CAPABILITY 860,000.00 860,000.00 CAPABILITY BUILDING OF LGU ON HEALTH PROGRAMS 606,400.00 606,400.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 CAPITAL ASSISTANCE AS SEA-K FRO SUSTAINABLE LIVELIHOOD FOR WOMEN (WIFE/DAUGHTERS OF FARMERS / FISHERFOLKS / PANTAWID PAMILYA AND MOTHERS DAY CARE CHILDREN) 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION OF PILOT PANTAWID PAMILYA, YOUTH FAMER BENEFICIARIES 2,200,000.00 2,200,000.00 REHABILITATION OF MUNICIPAL ROAD FRONTING THE MUNICIPAL BUILDING 500,000.00 500,000.00 1032 LARENA 3,120,000.00 - - 1,500,000.00 3,030,000.00 - - - - 2,200,000.00 500,000.00 - 750,000.00 1,400,000.00 12,500,000.00 FARM MECHANIZATION (1 UNIT HAND TRACTOR, 2 UNITS FLOATING TILLER, 2 UNITS CULTIVATOR TILLER) 720,000.00 720,000.00 ESTABLISHMENT OF IRRIGATION FACILITIES (RAM PUMP, SFR, SOLAR PUMP) 1,000,000.00 1,000,000.00 HIGH VALUE CROP ENHANCEMENT (BACKYARD GARDENING) 900,000.00 900,000.00 LIVESTOCK AND POULTRY PRODUCTION ENHANCEMENT 500,000.00 500,000.00 REPAIR/REHAB OF 12 CLASSROOMS 500,000.00 500,000.00 COMPLETION OF KINDERGARTEN CLASSROOM; REPAIR/REHAB OF 4 CLASSROOMS 500,000.00 500,000.00 IMPROVEMENT OF 1 UNIT KINDERGARTEN AND 5 CLASSROOMS; REPAIR/REHAB OF 7 UNITS CLASSROOMS 500,000.00 500,000.00 CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 REHAB/EXPANSION/UPGRADING OF LEVEL II/III BARANGAY WATER SYSTEM 2,530,000.00 2,530,000.00 CONSTRUCTION OF 2 UNITS DAY CARE CENTERS 1,700,000.00 1,700,000.00 REPAIR/UPGRADING OF 2 UNITS DAY CARE CENTERS 500,000.00 500,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) - FORMULATION OF MUNICIPAL INVESTMENT CODE 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION OF PANTAWID PAMILYA, YOUTH AND FARMER BENEFICIARIES 1,400,000.00 1,400,000.00 SKILLS AND ENHANCEMENT TRAINING PROGRAM 750,000.00 750,000.00 1033 LAZI 1,750,000.00 - - 1,200,000.00 3,500,000.00 - 1,900,000.00 - - 1,650,000.00 - - - 2,500,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 900,000.00 900,000.00 ORGANIC FERTILIZER PRODUCTION 850,000.00 850,000.00 BASIC EDUCATION FACILITIES: -REPAIR / REHABILITATION OF CLASSROOMS 1,200,000.00 1,200,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY 3,000,000.00 3,000,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,400,000.00 1,400,000.00 MATERNAL, NEONATAL, CHILD AND NUTRITION(MNCHN) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK 650,000.00 650,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS ( CONSTRUCTION OF BAHAYPAG-ASA FOR CICL) 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 2,500,000.00 2,500,000.00 1034 MARIA 1,000,000.00 - - 2,305,004.00 6,200,000.00 - 2,500,000.00 - - 500,000.00 - - - - 12,505,004.00 PROVISION OF MOTORIZED FISHING BOATS & FISHNETS 500,000.00 500,000.00 MANAGEMENT / MAINTENANCE OF MARINE PROTECTED AREAS 500,000.00 500,000.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 REPAIR AND REHABILITATION OF CLASSROOMS 166,667.00 166,667.00 ACQUISITION OF FIFTY (50) ARMCHAIRS 35,000.00 35,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 5 PURCHASE OF MODULES AND OTHER INSTRUCTIONAL MATERIALS FOR ALS 150,000.00 150,000.00 DISASTER ALARM SYSTEM 1,000,000.00 1,000,000.00 EVACUATION CENTER 1,000,000.00 1,000,000.00 FLOOD CONTROL & RIVER EMBANKMENTS 500,000.00 500,000.00 RESCUE EQUIPMENT & VEHICLES 3,000,000.00 3,000,000.00 REPAIR AND REHABILITAION OF WATER SYSTEM OF NABUTAY ES 200,000.00 200,000.00 CSO CAPABILITY BUILDING & WORKSHOP 500,000.00 500,000.00 PROVISION OF MEDICINES/VITAMINS FOR NEEDY SENIOR CITIZENS 500,000.00 500,000.00 PURCHASE OF MEDICINES, SUPPLIES AND EQUIPMENTS IN THE RURAL HEALTH UNIT 2,000,000.00 2,000,000.00 AWARENESS AND ORIENTATION ON GAD 500,000.00 500,000.00 1035 SAN JUAN 2,700,000.00 - - 840,000.00 5,990,000.00 - 500,000.00 - - 750,000.00 - - - 1,720,000.00 12,500,000.00 VARIOUS DA PROJECTS 2,700,000.00 2,700,000.00 IMPROVEMENT OF TAMBISAN WHARF - FISHERIES AND LIVELIHOOD PROGRAM FOR COASTAL AREA (BRGY. TAMBISAN, PALITON,TUBOD, CANGMUNAG, & MAITE - ORGANIC VEGETABLE PRODUCTION W/ PROJECT COMPONENT TO ORGANIC FERTILIZER PRODUCTION (VERMI COMPOSTING, IMO, FFJ, FAA, FPJ) FARM IMPLEMENT/ TOOLS W/ PLANT SHELTER - MARINE RESERVE AND FISHSANCTUARIES (MAINTENANCE & REHABILITATION OF MPA'S AND ESTABLISHMENT ADDITIONAL MPAS) - CONSTRUCTION OF SLAUGHTER HOUSE - GULAYAN SA PAARALAN 240,000.00 240,000.00 REPAIR/REHAB OF SCHOOL BUILDINGS 600,000.00 600,000.00 ESTABLISHMENT OF MUNICIPAL EVACUATION CENTER ( TO BE USED ALSO AS WOMEN CRISIS CENTER) 4,290,000.00 4,290,000.00 TECHNICAL DELINEATION OF SALVAGE ZONE 500,000.00 500,000.00 REHABILITATION/ UPGRADING/ EXPANSION OF MAIN PIPELINES OF CANGHALING WATERWORKS AND SANITATION MULTI-PURPOSE COOPERATIVE 1,200,000.00 1,200,000.00 PROCUREMENT OF HEALTH EQUIPMENT AND MICRONUTRIENT SUPPLEMENTS 500,000.00 500,000.00 REPAIR OF DAY CARE CENTERS 750,000.00 750,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,720,000.00 1,720,000.00 1036 SIQUIJOR (CAPITAL) 2,500,000.00 - - 2,500,000.00 1,500,000.00 - 500,000.00 - - 1,800,000.00 - - - 3,700,000.00 12,500,000.00 CROPS PRODUCTION PROJECT (VEGETABLE, CORN, RICE) 500,000.00 500,000.00 PROVISION OF SMALL FARM IMPLEMENTS AND ACQUISITION OF DRAFT ANIMALS FOR PLOWING 1,000,000.00 1,000,000.00 PROVISION OF FISHING NET, PUMPBOAT, BUBO, BUNGSOD, FISH CAGE, NET (8M HEIGHT - CAGE FOR POULTRY), NET (8M HEIGHT - CAGE FOR POULTRY), BANGUS/TILAPIA CULTURE 1,000,000.00 1,000,000.00 PROVISION OF EDUCATIONAL FACILITIES (REPAIR OF SCHOOL BUILDINGS) 1,500,000.00 1,500,000.00 REPAIR/REHABILITATION OF SCHOOL BUILDING 1,000,000.00 1,000,000.00 PROVISION OF POTABLE WATER FACILITIES AND MATERIALS 1,000,000.00 1,000,000.00 CAPACITY BUILDING PROGRAMS FOR CSOS 500,000.00 500,000.00 PROCUREMENT OF HEIGHT BOARD, DETECTO WEIGHING SCALE & WEIGHING SCALE (CALTER) 500,000.00 500,000.00 PROVISION OF ECCD LEARNING MATERIALS & HYGIENE KIT 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 800,000.00 800,000.00 HOT MEAL FEEDING 500,000.00 500,000.00 IMPROVEMENT/REHABILITATION/ASPHALT PAVING OF ACCESS ROAD 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,200,000.00 1,200,000.00 CONCRETE PAVING OF MABINI ST., ACCESS ROAD 1,500,000.00 1,500,000.00 REGION VIII 403,343,092.00 14,033,250.00 30,800,000.00 109,887,755.94 734,822,518.03 11,000,000.00 77,417,650.00 35,395,700.00 18,783,300.00 141,374,590.00 31,568,840.00 6,550,000.00 25,549,500.00 231,249,575.00 1,871,775,770.97 BILIRAN 22,734,161.40 - - 4,304,295.94 61,716,363.63 - 1,150,000.00 4,100,000.00 700,000.00 - 1,000,000.00 - - 3,720,000.00 99,424,820.97 1037 ALMERIA 2,500,000.00 - - 3,000,000.00 4,000,000.00 - - - - - - - - 3,000,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS (FISH PROCESSING) 1,500,000.00 1,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION (HANDTRACTOR AND THRESHER) 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES A. REPAIR/REHABILITATION OF CLASSROOMS B. PROVISION OF SCHOOL FURNITURES 3,000,000.00 3,000,000.00 FLOOD CONTROL (SEAWALL) 3,500,000.00 3,500,000.00 RESCUE EQUIPMENT (RESCUE BOAT) 500,000.00 500,000.00 CORE LOCAL ROAD (CONSTRUCTION / MAINTENANCE / REHABILITATION) 3,000,000.00 3,000,000.00 1038 BILIRAN 4,154,161.40 - - 304,295.94 7,466,363.63 - - - - - - - - - 11,924,820.97 TRADING POSTS/BAGSAKAN CENTER 973,636.36 973,636.36 PROVISION OF FARM TRACTOR 2,272,727.27 2,272,727.27 MOTORIZED BANCA/FISHNET 907,797.77 907,797.77 GULAYAN SA PAARALAN 125,298.33 125,298.33 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROVISION OF SCHOOL FURNITURE ( ARMCHAIRS )(DEP ED ELEM. & SECONDARY) 178,997.61 178,997.61 VARIOUS DILG PROJECTS 7,466,363.63 7,466,363.63 EVACUATION FACILITY - FLOOD CONTROL - 1039 CABUCGAYAN - - - - 9,800,000.00 - - 2,000,000.00 700,000.00 - - - - - 12,500,000.00 VARIOUS DILG PROJECTS 6,800,000.00 6,800,000.00 ACQUISITION OF DISASTER RESPONSE AND RESCUE VEHICLE - CONSTRUCTION OF EVACUATION CENTER - FLOOD CONTROL: CONSTRUCTION OF SEAWALL - FLOOD CONTROL:RIVER DIKES AND DRAINAGE - IMPROVEMENT OF CABUCGAYAN WATERWORK SYSTEM (LEVEL III) 2,000,000.00 2,000,000.00 REPAIR AND REHABILITATION OF BARANGAY WATER SYSTEMS (LEVEL II) 1,000,000.00 1,000,000.00 LIVELIHOOD ASSISTANCE (WOMEN & YOUTH SECTOR; FISHERFOLKS; FARMERS) 2,000,000.00 2,000,000.00 CABUCGAYAN MANGROOVE PARK: PRODUCT ASSESSMENT & ENHANCEMENT 700,000.00 700,000.00 1040 CAIBIRAN 500,000.00 - - - 10,200,000.00 - 200,000.00 600,000.00 - - 1,000,000.00 - - - 12,500,000.00 ESTABLISHMENT OF NURSERY & VEGETABLE PRODUCTION 500,000.00 500,000.00 RESCUE BOAT W/ COMPLETE ACCESSORIES 1,200,000.00 1,200,000.00 FLOOD CONTROL: CONSTRUCTION/ CONCRETING OF DRAINAGE SYSTEM 1,500,000.00 1,500,000.00 FLOOD CONTROL: SHORELINE PROTECTION (SEAWALL) 1,500,000.00 1,500,000.00 SALINTUBIG- REPAIR/REHABILITATION/PROVISION OF LEVEL III WATER SYSTEM 6,000,000.00 6,000,000.00 BASIC SANITATION FACILITIES: CONSTRUCTION OF WATER SEALED TOILET FACILITIES 200,000.00 200,000.00 INFRA SUPPORT TO AGRI FISHERY PRODUCTION AND DEVELOPMENT: MOTORIZED FISHING BOATS. 600,000.00 600,000.00 YAMAN PINOY 1,000,000.00 1,000,000.00 1041 CULABA 6,500,000.00 - - - 5,500,000.00 - 500,000.00 - - - - - - - 12,500,000.00 INFRA SUPPORT TO AGRI AND FISHERY PRODUCTION AND DEVELOPMENT INFRA SUPPORT TO AGRI AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTOR, PLANTER/SEEDER, HARVESTER, THRESHER, SHELLER, MOTORIZED FISHING BOAT, FISH NETS) 1. STRENGTHENING SMALL SKILL FISHING THRU PROVISION OF FISHING PARAPHERNALIA; MOTORIZED BANCA, PRODUCTION OF ORGANIC FERTILIZER AND PESTICIDES. 3,500,000.00 3,500,000.00 TRADING POST FACILITY 1.CONSTRUCTION OF TWO STOREY MARKET TIENDA] 3,000,000.00 3,000,000.00 SALIN TUBIG 1.EXPANSION OF CULABA WATER SYSTEM 5,500,000.00 5,500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION PROGRAM/PROJECT 500,000.00 500,000.00 1042 KAWAYAN 4,200,000.00 - - - 6,800,000.00 - - 1,500,000.00 - - - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION (TRACTOR, PLANTER/SEEDER, HARVESTER, THRESHER, SHELLER, MOTORIZED FISHING BOATS, FISH NETS) 4,200,000.00 4,200,000.00 CONSTRUCTION OF SEAWALL 5,320,000.00 5,320,000.00 PROCUREMENT OF NECESSARY FACILITY / EQUIPMENT FOR PRE AND POST DISASTER ACTIVITIES ( TRUCK & MOTORIZED RESCUE BOAT) 1,480,000.00 1,480,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM (DILP): WORKERS INCOME AUGMENTATION OF SUSTAINABLE LIVELIHOOD PROGRAMS FOR THE INFORMAL SECTORS (PROVISION OF LIVELIHOOD MATERIALS & EQUIPMENT TO DIFFERENT SECTORS/ORGANIZATIONS ) 1,500,000.00 1,500,000.00 1043 MARIPIPI 1,850,000.00 - - 1,000,000.00 9,650,000.00 - - - - - - - - - 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM EMPLOYMENT FACILITATION TRACK (PROVISION OF EASY ACCESS/ AVAILMENT OF LIVELIHOOD ACTIVITIES SUCH AS: POULTRY AND SWINE RAISING 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (PURCHASE ACQUISITION OF MOTORIZED FISHING BOAT, FISH NETS AND OTHER PARAPHERNALIA) 850,000.00 850,000.00 BASIC EDUCATION FACILITIES: COMPONENT 1: REPAIR / REHABILITATION OF CLASSROOMS; COMPONENT 2: PROVISION OF SCHOOL FURNITURES 1,000,000.00 1,000,000.00 PURCHASE OF RESCUE EQUIPMENT AND OTHER PARAPHERNALIAS (SUCH AS LIFE JACKETS & RESCUE BUOYS, PURCHASE OF RESCUE BOAT, PURCHASE OF PORTABLE AND BASE RADIO) 600,000.00 600,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY ( LEVEL III) 9,050,000.00 9,050,000.00 1044 NAVAL 3,030,000.00 - - - 8,300,000.00 - 450,000.00 - - - - - - 720,000.00 12,500,000.00 IRRIGATION PROJECT 960,000.00 960,000.00 ORGANIC FERTILIZER PRODUCTION 1,170,000.00 1,170,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION 900,000.00 900,000.00 VARIOUS DILG PROJECTS 5,150,000.00 5,150,000.00 FLOOD CONTROL PROJECT - CONSTRUCTION OF DRAINAGE - CONSTRUCTION OF EVACUATION CENTER IN BRGY. CALUMPANG - IMPROVEMENT OF LEVEL III WATER SYSTEM OF BARANGAYS CATMON, HAGUIKHICAN AND CAPIAHAN, SABANG, VILLACONSUELO, VILLACANEJA 3,150,000.00 3,150,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM - PROCUREMENT OF SEA AMBULANCE 450,000.00 450,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORE LOCAL ROAD CONSTRUCTION ( FOOTBRIDGE) 720,000.00 720,000.00 EASTERN SAMAR 48,127,292.60 2,000,000.00 2,907,000.00 6,152,500.00 116,407,532.40 - 11,719,000.00 2,543,200.00 - 42,534,800.00 2,500,000.00 - 1,500,000.00 53,108,625.00 289,499,950.00 1045 ARTECHE - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF TWO-STOREY STANDARD EVACUATION CENTER 12,500,000.00 12,500,000.00 1046 BALANGIGA - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CORE LOCAL ROAD CONCRETING / REHABILITATION 12,500,000.00 12,500,000.00 1047 BALANGKAYAN 2,600,000.00 1,000,000.00 - - 1,700,000.00 - - - - 3,000,000.00 1,000,000.00 - - 3,200,000.00 12,500,000.00 CONSTRUCTION OF FISH LANDING 1,000,000.00 1,000,000.00 PROVISION OF POST HARVEST FACILITIES (MULTIPURPOSE DRYING PAVEMENT AND MECHANICAL DRYER 800,000.00 800,000.00 REHABILITATION AND EXPANSION OF IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF TRADING POST 800,000.00 800,000.00 VARIOUS DILG PROJECTS 700,000.00 700,000.00 FLOOD CONTROL PROJECT FOR BRGY. CAISAWAN, BANGON, MAGSAYSAY AND JULAG - REHABILITATION OF DRAINAGE CANAL IN BRGY. 1,2,3,4, AND 5 - CAPABILITY BUILDING FOR CSOS AND BANTAY DAGAT - CONSTRUCTION OF POTABLE WATER SYSTEM FOR BRGY. JULAG, MAGSAYSAY, GEN. MALVAR AND BANGON 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 1,000,000.00 1,000,000.00 CONSTRUCTION OF WOMEN AND CHILDREN CRISIS CENTER 1,000,000.00 1,000,000.00 CONSTRUCTION OF SENIOR CITIZENS SERVICES CENTER 1,000,000.00 1,000,000.00 LOCAL TOURISM INDUSTRY PACKAGE SUPPORT (FOOD AND NON- FOOD SERVICES) SHARED SERVICE FACILITY 1,000,000.00 1,000,000.00 CORE LOCAL ROAD FOR ACCESS TO EVACUATION CENTER 800,000.00 800,000.00 CORE LOCAL ROAD AT ILIHAN ST., MARAMAG AND MIRANDA ROADS, BRGY. CABAY 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) GULAYAN NG BAYAN PACKAGED WITH GARDEN TOOLS 500,000.00 500,000.00 CORE LOCAL ROAD FROM BRGY. CAISAWAN, MAGSAYSAY AND GEN. MALVAR 900,000.00 900,000.00 1048 BORONGAN CITY - - - 580,000.00 8,000,000.00 - - - - 5,920,000.00 - - - - 14,500,000.00 GULAYAN SA PAARALAN 580,000.00 580,000.00 CONSTRUCTION OF HANGING BRIDGE 8,000,000.00 8,000,000.00 CONSTRUCTION AND REHABILITATION OF DAY CARE CENTERS 5,920,000.00 5,920,000.00 1049 CAN-AVID 4,607,000.00 - - - 6,379,950.00 - 1,088,000.00 - - - - - - 425,000.00 12,499,950.00 CONSTRUCTION OF WHARF AT BRGY. 03 2,907,000.00 2,907,000.00 CONSTRUCTION OF WHARF AT BRGY. CAMANTANG 425,000.00 425,000.00 CONSTRUCTION OF WHARF AT BRGY. GUIBUANGAN 425,000.00 425,000.00 CONSTRUCTION OF WHARF AT BRGY. SALVACION 425,000.00 425,000.00 CONSTRUCTION OF WHARF AT BRGY. CAROLINA 425,000.00 425,000.00 VARIOUS DILG PROJECTS 5,903,950.00 5,903,950.00 CONSTRUCTION OF EVACUATION FACILITY (POBLACION) - PURCHASE OF RESCUE EQUIPMENT - CONSTRUCTION OF FLOOD CONTROL AT BRGY. 09 - CONSTRUCTION OF FLOOD CONTROL BRGY. MALOGO - CONSTRUCTION OF FLOOD CONTROL AT BRGY. CANTEROS - CONSTRUCTION OF FLOOD CONTROL AT SO. MINALORO, CAGHALONG - CONSTRUCTION OF FLOOD CONTROL AT BARUK - CONSTRUCTION OF FLOOD CONTROL AT CAN-ILAY - CONSTRUCTION OF FLOOD CONTROL AT CAMANTANG - CONSTRUCTION OF FLOOD CONTROL AT GUIBUANGAN - CONSTRUCTION OF FLOOD CONTROL AT SALVACION - CONSTRUCTION OF FLOOD CONTROL AT CAROLINA - CONSTRUCTION OF LEVEL II WATER SYSTEM TO SUPPLY 100 HH AT BRGY. OBONG 476,000.00 476,000.00 CONSTRUCTION OF HEALTH STATION AT BRGY. PANDOL 544,000.00 544,000.00 CONSTRUCTION OF HEALTH STATION AT BRGY. BALAGON 544,000.00 544,000.00 CONSTRUCTION OF LOCAL ROAD (FOOT BRIDGE AT BRGY. JEPACO) 425,000.00 425,000.00 1050 DOLORES 1,400,000.00 - - - 10,600,000.00 - - - - - 500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,400,000.00 1,400,000.00 PROVISION OF FARM MACHINERIES AND POST - HARVEST FACILITIES - CRAB POND DEVELOPMENT (PHASE 1) - PROVISION OF BANTAY DAGAT (FACILITIES & EQUIPMENT) - FEEDS PRODUCTION - CORN PRODUCTION - CONSTRUCTION OF EVACUATION CENTER (PHASE 1) 2,000,000.00 2,000,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER (PHASE 1) 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL 2 WATER SUPPLY SYSTEM 4,600,000.00 4,600,000.00 YAMAN PINOY 500,000.00 500,000.00 1051 GENERAL MACARTHUR - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CORE LOCAL ROAD 9,500,000.00 9,500,000.00 FARM-TO-MARKET ROAD 3,000,000.00 3,000,000.00 1052 GIPORLOS 2,965,375.00 - - - - - 3,671,000.00 - - 2,300,000.00 - - - 3,563,625.00 12,500,000.00 VARIOUS DA PROJECTS 2,865,375.00 2,865,375.00 A. CONSTRUCTION OF SHALLOWTUBE WELLS - B. CONSTRUCTION OF SMALL PUMP RESERVIOR - 2. FARMER'S FIELD SCHOOL AND DEMO FARM A. ORGANIC FERTILIZER PROD. AND ORGANIC AGRICULTURE DEMO AND TRAINING FARM - 3. COCONUT REHABILITATION - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE AGRI - BASED LIVELIHOOD PROGRAM - TILAPIA HATCHERY AND BREEDING FARM 1. TILAPIA HATCHERY - FISHERY DEVELOPMENT PROGRAM A. CAPABILITY BUILDING FOR FISHERFOLKS - TECHNOLOGY 100,000.00 100,000.00 B. REHABILITATION OF FISH SANCTUARIES - MNCHN ACTIVITIES 3,671,000.00 3,671,000.00 CHILDREN PROTECTION PROGRAM A. CONSTRUCTION OF DAY CARE CENTER 1,800,000.00 1,800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM A. TRAINING ON BASIC SKILLS MANAGEMENT TRAINING B. LIVELIHOOD FINANCIAL ASSISTANCE 500,000.00 500,000.00 CORE ROAD CONSTRUCTION 3,563,625.00 3,563,625.00 1053 GUIUAN 1,200,000.00 - - - 2,000,000.00 - - - - - - - - 9,300,000.00 12,500,000.00 AGRO PROCESSING FACILITIES AND EXPANDED AGRI BUSINESS ACTIVITIES (MAT AND BASKET WEAVING) 1,200,000.00 1,200,000.00 CONSTRUCTION OF STANDARD EVACUATION CENTER 2,000,000.00 2,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) 7,600,000.00 7,600,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) (DUCK RAISING AND QUAIL EGG PRODUCTION) 1,700,000.00 1,700,000.00 1054 HERNANI 3,500,000.00 1,000,000.00 - - 4,500,000.00 - 1,000,000.00 - - 1,500,000.00 - - - 1,000,000.00 12,500,000.00 PROVISION OF 15 DEEP SEA MOTORIZED FISHING BOATS, FISHING IMPLEMENTS & FISH SHELTER CONSTRUCTION 1,500,000.00 1,500,000.00 REHABILITATION OF IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 POST-HARVEST FACILITIES (PROVISION OF 1 MOBILE UNIT RICE MILL) 500,000.00 500,000.00 FISH LANDING 1,500,000.00 1,500,000.00 REHABILITATION OF LEVEL III POTABLE WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 CAPABILITY BUILDING FOR CSOS / VALUE FORMATION PROGRAM 500,000.00 500,000.00 EVACUATION CENTER 2,000,000.00 2,000,000.00 RHU / BHS EQUIPMENT (BRGY. GARAWON) 1,000,000.00 1,000,000.00 CONSTRUCTION OF ONE UNIT COMMUNITY LEARNING CENTER 1,500,000.00 1,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 1,000,000.00 1055 JIPAPAD - - - - - - - - - 12,500,000.00 - - - - 12,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (RICE RETAIL, SOAP MAKING) 12,500,000.00 12,500,000.00 1056 LAWAAN 2,500,000.00 - - - 9,500,000.00 - - - - 500,000.00 - - - - 12,500,000.00 REHABILITATION AND STRENTHENING OF EXISTING FISH SANCTUARIES 800,000.00 800,000.00 MUD CRAB FATTENING (SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD) 1,700,000.00 1,700,000.00 CONSTRUCTION OF RIVER FLOOD CONTROL AT BRGY. TAGUITE 5,000,000.00 5,000,000.00 CONSTRUCTION OF RIVER FLOOD CONTROL AT BRGY. BOLUSAO 4,500,000.00 4,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 1057 LLORENTE 4,000,000.00 - - 1,000,000.00 5,200,000.00 - - - - - - - 800,000.00 1,500,000.00 12,500,000.00 VARIOUS DA PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF FISH LANDING FACILITIES WITH MARKET, COLD STORAGE AND DRYING FACILITIES - ESTABLISHMENT AND REHABILITATION OF IRRIGATION SYSTEM - INFRASTRUCTURE SUPPORT TO AGRICULTURAL PRODUCTION AND DEVELOPMENT - SHELTER, MOTORIZED FISHING BOAT, FISH NETS - REPAIR/REHABILITATION OF SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 WATER SYSTEM (SALINTUBIG) 2,000,000.00 2,000,000.00 CONSTRUCTION OF SEA WALL 2,200,000.00 2,200,000.00 REHABILITATION OF EXISTING LLORENTE RVER FLOOD CONTROL 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,500,000.00 1,500,000.00 TECHNICAL VOCATIONAL TRAINING 800,000.00 800,000.00 1058 MASLOG - - - - 10,610,000.00 - - - - 1,120,000.00 - - - 770,000.00 12,500,000.00 VARIOUS DILG PROJECTS 8,410,000.00 8,410,000.00 CONSTRUCTION OF HANGING FOOTBRIDGE - CONSTRUCTION/REHABILITATION OF CONCRETE PATHWAY WTH DRAINAGE CANAL - SALINTUBIG PROGRAM 2,200,000.00 2,200,000.00 EVACUATION CENTER 1,120,000.00 1,120,000.00 FOOD PRODUCTION (ANIMALS AND CROPS) 770,000.00 770,000.00 1059 MAYDOLONG 800,000.00 - - - 9,300,000.00 - - 1,200,000.00 - 500,000.00 - - 700,000.00 - 12,500,000.00 PROCUREMENT OF FARM TOOLS 800,000.00 800,000.00 REHABILITATION AND IMPROVEMENT OF DRAINAGE CANAL AT POBLACION BARANGAYS 4,900,000.00 4,900,000.00 REHABILITATION AND IMPROVEMENT OF LEVEL III WATER SUPPLY SYSTEMS INCLUDING APPROPRIATE WATER TREATMENT SYSTEM 1,400,000.00 1,400,000.00 REHABILITATION AND IMPROVEMENT OF LEVEL II WATER SUPPLY SYSTEM 2,400,000.00 2,400,000.00 CSO CAPABILITY BUILDING PROGRAM 600,000.00 600,000.00 LIVELIHOOD PROGRAM 1,200,000.00 1,200,000.00 CONSTRUCTION OF DAY CARE CENTER AT BARANGAY CANLOTERIO 500,000.00 500,000.00 SKILLS TRAINING PROGRAM 700,000.00 700,000.00 1060 MERCEDES - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF TWO-STOREY STANDARD EVACUATION CENTER 12,500,000.00 12,500,000.00 1061 ORAS - - - 980,000.00 8,635,000.00 - - 500,000.00 - 2,385,000.00 - - - - 12,500,000.00 BASIC EDUCATION FACILITIES - REPAIR / REHABILITATION OF CLASSROOMS - PROVISION OF SCHOOL FURNITURE 980,000.00 980,000.00 SALINTUBIG - PROVISION FO POTABLE WATER 1,260,000.00 1,260,000.00 VARIOUS DILG PROJECTS 7,375,000.00 7,375,000.00 EVACUATION FACILITY - RESCUE EQUIPMENT - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS FLOOD CONTROL - DOLE INTEGRATED LIVELIHOOD PROGRAM (DLIP); TULONG PANGKABUHAYAN PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 2,385,000.00 2,385,000.00 1062 QUINAPONDAN 3,557,500.00 - - 832,500.00 1,500,000.00 - - - - - 500,000.00 - - 6,110,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (SHALOWPAYAO) 475,000.00 475,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (FISH PROCESSING) 480,000.00 480,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (COCOA BASED MULTIPLE CROPPING) 570,000.00 570,000.00 PROCUREMENT OF MECHANICAL DRYER AND EXPANSION OF WAREHOUSE FOR FARM INPUTS 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PRODUCTION 532,500.00 532,500.00 PROVISION OF SCHOOL FURNITURE 724,500.00 724,500.00 GULAYAN SA PAARALAN 108,000.00 108,000.00 CONSTRUCTION OF EVACUATION FACILITY 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (FOOD PROCESSING) 500,000.00 500,000.00 CONSTRUCTION/REHABILITATION/MAINTENANCE OF CORE LOCAL RAD 6,110,000.00 6,110,000.00 1063 SALCEDO 3,330,000.00 - 800,000.00 - 6,470,000.00 - 950,000.00 - - 950,000.00 - - - - 12,500,000.00 IRRIGATION PROJECTS 950,000.00 950,000.00 AGRI-FISHERY TRAINING 500,000.00 500,000.00 PROCUREMENT OF FARM IMPLEMENT TOOLS 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL AND FISHERY PRODUCTION AND DEVELOPMENT 1,380,000.00 1,380,000.00 NATIONAL GREENING PROGRAM 800,000.00 800,000.00 VARIOUS DILG PROJECTS 4,350,000.00 4,350,000.00 CONSTRUCTION OF SAFE EVACUATION FACILITY - PROCUREMENT OF RESCUE TOOLS AND EQUIPMENT - UPGRADING OF LEVEL III MUNICIPAL WATER SYSTEM 1,620,000.00 1,620,000.00 CAPABILITY BUILDING FOR CSOS, POS, FISHERY AND COOP. 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT 950,000.00 950,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 950,000.00 950,000.00 1064 SAN JULIAN 2,120,000.00 - 2,107,000.00 1,160,000.00 500,000.00 - 2,410,000.00 343,200.00 - 3,359,800.00 500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 2,120,000.00 2,120,000.00 PROVISION OF PRE AND POST HARVEST FACILITIES - IRRIGATION FACILITIES - AGRI-FISHERY TRAINING - REFORESTATION PROJECT 2,107,000.00 2,107,000.00 GULAYAN SA PAARALAN 160,000.00 160,000.00 REHABILITATION OF 5 CLASSROOM 1,000,000.00 1,000,000.00 CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH FACILITIES 2,410,000.00 2,410,000.00 SPES 343,200.00 343,200.00 VARIOUS KC PROJECTS 1,359,800.00 1,359,800.00 CONSTRUCTION OF 2UNITS DAY-CARE CENTERS - REPAIR OF 3 UNITS DAY-CARE CENTERS - LIVELIHOOD PROJECTS 1,000,000.00 1,000,000.00 CRISIS CENTER CONSTRUCTION 1,000,000.00 1,000,000.00 LRED 500,000.00 500,000.00 1065 SAN POLICARPO 8,987,417.60 - - - 3,512,582.40 - - - - - - - - - 12,500,000.00 MARINE RESERVED AND FISH SANCTUARY 1,797,483.52 1,797,483.52 IRRIGATION PROJECT 2,696,225.28 2,696,225.28 INFRA SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT 2,696,225.28 2,696,225.28 INFRA SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT 1,797,483.52 1,797,483.52 CONSTRUCTION OF STANDARD EVACUATION CENTER 3,512,582.40 3,512,582.40 1066 SULAT 2,160,000.00 - - - - - 600,000.00 - - 7,500,000.00 - - - 2,240,000.00 12,500,000.00 COCO BY-PRODUCTS PROCESSING 1,000,000.00 1,000,000.00 CONSTRUCTION OF RICEMILL 600,000.00 600,000.00 FISH CAPES 560,000.00 560,000.00 UPGRADING OF BHS AND FACILITIES 600,000.00 600,000.00 CONSTRUCTION OF EVACUATION CENTER 7,500,000.00 7,500,000.00 CONSTRUCTION/REHABILITATAION/MAINTENANCE OF CORE LOCAL ROADS 2,240,000.00 2,240,000.00 1067 TAFT 4,400,000.00 - - 1,600,000.00 3,000,000.00 - 2,000,000.00 500,000.00 - 1,000,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 2,147,500.00 2,147,500.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL PRODUCTION - CONSTRUATION OF MUNICIPAL TRADING POST - MEAT, FISH PROCESSING 902,500.00 902,500.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL PRODUCTION 1,350,000.00 1,350,000.00 REPAIR/REHABILITATION OF CLASSROOMS 1,600,000.00 1,600,000.00 EVACUATION CENTER 3,000,000.00 3,000,000.00 CONSTRUCTION OF BARANGAY HEATH CENTER 1,000,000.00 1,000,000.00 CONSTRUCTION OF BIRTHING CENTER 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 1,000,000.00 1,000,000.00 LEYTE 143,723,000.00 2,912,500.00 11,329,000.00 44,479,660.00 222,923,000.00 - 15,521,500.00 9,547,000.00 11,002,500.00 63,530,000.00 11,735,340.00 - 5,750,000.00 37,600,000.00 580,053,500.00 1068 ABUYOG 7,787,500.00 1,712,500.00 - - - - - - - - 500,000.00 - - 2,500,000.00 12,500,000.00 TILAPIA HATCHERY, BREEDING AND FATTENING 812,500.00 812,500.00 CONSTRUCTION OF COMMUNAL IRRIGATION 1,712,500.00 1,712,500.00 VEGETABLE PRODUCTION 812,500.00 812,500.00 SMALL RUMINANT PRODUCTION 912,000.00 912,000.00 PIGGERY 812,000.00 812,000.00 CONSTRUCTION OF TRAINING CENTER PHASE 1 1,013,500.00 1,013,500.00 COFFEE/FRUIT TREES AND MARINE CULTURE 1,212,000.00 1,212,000.00 CUT FLOWER PRODUCTION 713,000.00 713,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ICMP(INTEGRATED COASTAL MANAGEMENT PLANNING) PLAN FORMULATION/MARINE PROTECTED AREAA.) UNDER SEA ASSESSMENT SURVEY - 50,000.00 B.) GIS MAPPING - 100,000.00 C.)FORMULATION AND PACKAGING 1,500,000.00 1,500,000.00 STREAMLINING BUSINESS PERMITS AND LICENSING 500,000.00 500,000.00 RIVER/FLOOD CONTROL AND SOIL PROTECTION (RIPRAP) PHASE 1, ALONG TARUSAN,CAN-UGUIB AND NALIBUNAN RIVERS 2,500,000.00 2,500,000.00 1069 ALANGALANG 1,500,000.00 - 1,000,000.00 3,000,000.00 4,000,000.00 - 1,000,000.00 500,000.00 - 500,000.00 - - 1,000,000.00 - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BASED INVESTMENTS (CROP DIVERSIFICATION/ MULTI- CROPPING INCLUDING REPLANING OF COCONUT TREES, VEGETABLES, ROOT CROPS & OTHER FRUIT BEARIGN TREES; 2. PROVISION OF SWINE, GOAT, CARABAO, & OTHER LIVESTOCK; 3. DEMO FARMS: RICE & VEGETABLE INSTALLATION & BRGY.NURSERIES; 4. PROVISION OF CAPITAL ASSITANCE FOR RIVE & VEGETABLE PRODUCTION) 1,500,000.00 1,500,000.00 NATIONAL GREENING PROGRAM (LEYTE SAB-A BASIN PETLAND) 516,000.00 516,000.00 NATIONAL GREENING PROGRAM (RIPARIAN PLANTING IN FLOOD- PRONE BARANGAYS) 484,000.00 484,000.00 BASIC EDUCATION FACILITIES (REPAIR OF SCHOOL BUILDINGS AND PROVISION OF SCHOOL FURNITURES) 3,000,000.00 3,000,000.00 EXPANSION OF LEVEL III WATER SUPPLY FOR BRGY. BORSETH, CABADSAN, BINOTONG, AND HUPIT 2,000,000.00 2,000,000.00 CONSTRUCTION OF EVACUATION FACILITY 2,000,000.00 2,000,000.00 HEALTH EMERGENCY MANAGEMENT 1,000,000.00 1,000,000.00 DILEEP 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 TECHNICAL AND VOCATIONAL COMMUNITY-BASED TRAINING ON HAIR DRESSING, NAIL CARE, AND FOOD PROCESSING 1,000,000.00 1,000,000.00 1070 ALBUERA 6,510,500.00 - 425,000.00 2,150,160.00 - - 884,000.00 - 575,000.00 1,530,000.00 425,340.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 6,510,500.00 6,510,500.00 CONSTRUCTION OF SMALL WATER IMPOUNDING PROJECT - CONSTRUCTION OF SMALL SCALE IRRIGATIONS SYSTEM - CONSTRUCTIONOF SMALL DIVERSION DAM - INSTALLATION OF OPEN SOURCE PUMP FOR IRRIGATION - ACQUISITION OF HAND TRACTOR SET WITH THRESHER / HARVESTER/ SHELLER - ACQUISITION OF MOTORIZED FISHING BOAT WITH ACCESSORIES & FISHNETS - REHABILITATION OF FISH SANCTUARIES AND MARINE RESERVE AREA - POULTRY/ LIVESTOCK / AQUACULTURE PROGRAM AT DEMO FARM - NATIONAL GREENING PROGRAM 425,000.00 425,000.00 PROVISION OF SCHOOL FURNITURE: ARMCHAIRS/DESK 1,946,160.00 1,946,160.00 GULAYAN SA PAARALAN 204,000.00 204,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 127,500.00 127,500.00 HEALTH FACILITY ENHANCEMENT PROGRAM 756,500.00 756,500.00 ADDITIONAL RECREATIONAL AMENITIES AT SIBUGAY MOUNTAIN RESORT 575,000.00 575,000.00 SKILLS ON COMPUTER LITERACY COMMUNITY-BASED TRAINING PROGRAM FOR OSY 425,000.00 425,000.00 CONSTRUCTION OF ONE (1) UNIT ECCD CENTER/DAY CARE CENTER 680,000.00 680,000.00 PROVISION OF ECCD MATERIALS FOR DAY CARE CENTERS 425,000.00 425,000.00 PROCESSED FOOD INDUSTRY CLUSTERING PROJECT 425,340.00 425,340.00 1071 BABATNGON 1,500,000.00 - 1,000,000.00 - 8,500,000.00 - - - - 1,500,000.00 - - - - 12,500,000.00 ESTABLISHMENT OF BABATNGON AGRIFARM AND ECONOMIC GROWTH CENTER 1,500,000.00 1,500,000.00 URBAN GREENING 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 7,500,000.00 7,500,000.00 CONSTRUCTION OF WATER SYSTEM (LEVEL 2) 1,000,000.00 1,000,000.00 CONSTRUCTION OF BABATNGON YOUTH/WOMENS CRISIS CENTER 750,000.00 750,000.00 SKILLS TRAINING PROGRAM FOR OUT-OF-SCHOOL YOUTH (OSY) 750,000.00 750,000.00 1072 BARUGO 2,450,000.00 - - 300,000.00 4,500,000.00 - - 1,075,000.00 - 3,750,000.00 - - 500,000.00 - 12,575,000.00 VARIOUS DA PROJECTS 2,450,000.00 2,450,000.00 VEGETABLE PRODUCTION - ESTABLISHMENT OF ORGANIC FERTILIZER PRODUCTION FACILITIES - ESTABLISHMENT OF MANGROVE NURSERY - REHABILITATION OF MECHANICAL DRYERS - PROVISION OF MOTORIZED BOATS AND EQUIPMENTS (BFAR) - CONSTRUCTION OF IRRIGATION FACILITIES - PROVISION OF FARM MACHINERIES AND EQUIPMENTS - GULAYAN SA PAARALAN 300,000.00 300,000.00 PROVISION OF LEVEL II WATER SYSTEM 500,000.00 500,000.00 EXTENSION OF SEAWALL 1,000,000.00 1,000,000.00 ESTABLISHMENT & CONSTRUCTION OF DISASTER RESILIENT DRRM EVACUATION CENTER 3,000,000.00 3,000,000.00 ALTERNATIVE LIVELIHOOD PROGRAM FOR TUBA GATHERERSSUCH AS TAILORING/DRESSMAKING AND BARBER SHOP 500,000.00 500,000.00 SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENTS (SPES) 575,000.00 575,000.00 ALTERNATIVE LIVELIHOOD PROGRAM (RECYCLING, BACKYARD PIGGERY AND POULTRY) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (DSWD) 1,000,000.00 1,000,000.00 ESTABLISHMENT OF DAY CARE CENTERS (DSWD) 1,750,000.00 1,750,000.00 SKILLS TRAINING (MASONRY & SMAW) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 1073 BATO 10,700,000.00 - - 1,000,000.00 - - - 800,000.00 - - - - - - 12,500,000.00 INFRA SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT 700,000.00 700,000.00 TRADING POST 10,000,000.00 10,000,000.00 BASIC EDUCATION FACILITIES 1,000,000.00 1,000,000.00 INTEGRATED LIVELIHOOD PROGRAM: WORKERS INCOME AUGMENTATION PROGRAM 800,000.00 800,000.00 1074 BAYBAY CITY 1,850,000.00 - 700,000.00 3,928,500.00 500,000.00 - 2,000,000.00 - - 10,500,000.00 1,000,000.00 - - - 20,478,500.00 VARIOUS DA PROJECTS 1,850,000.00 1,850,000.00 FARM IMPLEMENTS/TOOLS ACQUISITION OF USER-FRIENDLY FARM IMPLEMENTS DA-10 - SUSTAINABLE AGRI-FISHERY-BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS ESTABLISHMENT OF ANIMAL PRODUCTION FARMDA-08) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS ESTABLISHMENT OF HOUSEHOLD-BASED CONTAINERIZED GARDENS DA-08 - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT PROVISION OF MOTORIZED BANCA WITH CORRESPONDING FISHING GEARSDA-02 - NATIONAL GREENING PROGRAM DENR-01 700,000.00 700,000.00 BASIC EDUCATION FACILITIES UPGRADING OF CLASSROOMS AND PROVISION OF THE NECESSARY SCHOOLFURNITURE TO 24 ELEMENTARY AND8 SECONDARY SCHOOLS(DEPED-01) 3,030,500.00 3,030,500.00 GULAYAN SA PAARALAN- ESTABLISHMENT OF GULAYAN SA PAARALAN(DEPED-02) 138,000.00 138,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION (ABOT ALAM PROGRAM)-IMPLEMENTATION OF THE ABOT ALAM PROGRAMDEPED-03 760,000.00 760,000.00 CAPACITY BUILDING FOR CSOS (DILG-1) 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENTDOH-10 2,000,000.00 2,000,000.00 PROTECTIVE SERVICES (PS) UPGRADING OF THE SENIOR CITIZEN DAY CENTER WITH COMPLETE MEDICAL AND DENTAL AMENITIES (DSWD-04) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - LIVELIHOOD ASSISTANCE FOR 4PS BENEFICIARIES(DSWD-01) 2,000,000.00 2,000,000.00 PS- SKILLS TRAINING FOR WOMEN WITH CORRESPONDING EQUIPMENT/FACILITIES IN THE TRAINING CENTER OF THE CITYDSWD-04 2,000,000.00 2,000,000.00 SLP - LIVELIHOOD ASSISTANCE FOR VENDORS DSWD-01 1,000,000.00 1,000,000.00 SLP- LIVELIHOOD ASSISTANCE FOR SAND AND GRAVEL EXTRACTORS DSWD-01 500,000.00 500,000.00 PS- SKILLS TRAINING FOR OUT-SCHOOL-YOUTH (OSYS)WITH COMPLETE AMENITIES DSWD-04 500,000.00 500,000.00 PS SKILLS TRAINING FOR THE HOMOSEXUAL GROUP WITH COMPLETE AMENITIES DSWD-04 1,000,000.00 1,000,000.00 PS PROVISION OF CAROMATA TO PORTERS WITH CORRESPONDING SKILLS TRAINING FOR ITS MAINTENANCE AND SUSTAINABILITYDSWD-04 500,000.00 500,000.00 SLP-LIVELIHOOD ASSISTANCE FOR WASTE PICKERS DSWD-01 500,000.00 500,000.00 PS- SKILLS TRAINING FOR SENIOR CITIZENS AND PERSONS WITH DISABILITIES (PWDS) WITH CORRESPONDING KITS DSWD-04 1,000,000.00 1,000,000.00 FAMILY WELFARE PROGRAM(DSWD 04) 500,000.00 500,000.00 YAMAN PINOY INTEGRATED DEVELOPMENT PROGRAM FOR PANDAN-BASED HANDICRAFTS(DTI-02) 1,000,000.00 1,000,000.00 1075 BURAUEN 5,500,000.00 - - - - - - - - - - - - 7,000,000.00 12,500,000.00 CONSTRUCTION OF TRADING POST 5,500,000.00 5,500,000.00 LOCAL CORE ROAD CONSTRUCTION FROM BRGY. CALAO TO BRGY. VILLA AURORA ROAD SECTION 7,000,000.00 7,000,000.00 1076 CALUBIAN 1,450,000.00 - 700,000.00 7,500,000.00 1,250,000.00 - 600,000.00 - - - 1,000,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,450,000.00 1,450,000.00 FISH CULTURE - MOTORIZED BANCA - TRAINING/TECHNO DEMO - FARM MACHINES - MANGROVE REHABILITATION 200,000.00 200,000.00 WATER SHED REFORESTATION 500,000.00 500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 COMPLETION OF BRGY. KOKOY SECONDARY SCHOOL 7,000,000.00 7,000,000.00 VARIOUS DILG PROJECTS 1,250,000.00 1,250,000.00 CONSTRUCTION OF SEA WALL IN BRGY. VILLANUEVA & TABLA - FLOOD CONTROL & RIPRAPPING - PURCHASE OF WEIGHING SCALE/BP APPARATUS 600,000.00 600,000.00 LIVELIHOOD PROJECT (FOOD PROCESSING) 1,000,000.00 1,000,000.00 1077 CAPOOCAN 3,500,000.00 - 500,000.00 740,000.00 5,650,000.00 - - - - 500,000.00 1,110,000.00 - 500,000.00 - 12,500,000.00 ESTABLISHMENT OF GOAT PRODUCTION FARM 500,000.00 500,000.00 SEASON LONG FARMERS FIELD SCHOOL ON HIGH VALUE COMMERCIAL CROPS 500,000.00 500,000.00 PROVISION OF PRE AND POST HARVEST FACILITIES 500,000.00 500,000.00 PROVISION OF FISHING GEARS 500,000.00 500,000.00 COASTAL RESOURCE MANAGEMENT TRAINING 500,000.00 500,000.00 PALAY CHECK INTEGRATED PEST MANAGEMENT TRAINING 500,000.00 500,000.00 REHABILITATION OF MARINE PROTECTED AREAS (FISH SANCTUARY AT BRGY. CULASIAN) 500,000.00 500,000.00 MANGROVE RESTORATION - NATIONAL GREENING PROGRAM 500,000.00 500,000.00 PROVIDE SUSTAINABILITY MEASURES ON THE IMPLEMENTATION OF GULAYAN SA PAARALAN TO ALL ELEMENTARY AND SECONDARY 240,000.00 240,000.00 IMMEDIATE REPAIR OF DAMAGED CLASSROOMS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS DILG PROJECTS 5,650,000.00 5,650,000.00 FLOOD CONTROL: CONSTRUCTION OF DRAINAGE SYSTEM AND ADDITIONAL OUTLET TO CARIGARA BAY (POB. ZONE I AND POB. ZONE II) - FLOOD CONTROL: CONSTRUCTION OF SEAWALL/BREAKWATER - CONSTRUCTION OF EVACUATION CENTER - PROCUREMENT OF EMERGENCY EQUIPMENT - PROCUREMENT OF APPROPRIATE TOOLS FOR RESCUE - PROCUREMENT OF RESCUE VEHICLES - PROVISION OF ADDITIONAL CAPITAL FOR CSOS 500,000.00 500,000.00 ALTERNATIVE LIVELIHOOD PROGRAM FOR CSOS AND BAYONG WEAVERS 1,110,000.00 1,110,000.00 PROVISION OF TECHNICAL/VOCATIONAL TRAINING 500,000.00 500,000.00 1078 CARIGARA 5,840,000.00 - - 816,000.00 5,844,000.00 - - - - - - - - - 12,500,000.00 SMALL DIVERSION DAM PROJECT IN LINDOG RIVER 2,400,000.00 2,400,000.00 ALTERNATIVE LIVELIHOOD FOR FISHERFOLK 2,240,000.00 2,240,000.00 ESTABLISHMENT OF A TRADING POST (BAGSAKAN CENTER) 1,200,000.00 1,200,000.00 REPAIR OF CLASSROOMS 816,000.00 816,000.00 CONSTRUCTION OF FLOOD CONTROL STRUCTURE 3,200,000.00 3,200,000.00 CONSTRUCTION OF 1 UNIT STANDARD EVACUATION CENTER (WITH TOILETS FOR MEN, WOMEN AND PWDS 2,644,000.00 2,644,000.00 ESTABLISHMENT OF TOURISM INFORMATION AND PASALUBONG CENTER - - 1079 DAGAMI 3,300,000.00 - 2,000,000.00 2,700,000.00 4,500,000.00 - - - - - - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT 2,000,000.00 2,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT 800,000.00 800,000.00 FARM IMPLEMENTS/TOOLS 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT - INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT - FARM IMPLEMENTS/TOOLS - NATIONAL GREENING PROGRAM 2,000,000.00 2,000,000.00 NATIONAL GREENING PROGRAM - REPAIR OF 31 ROOMS OF 11 SCHOOL BUILDINGS 2,700,000.00 2,700,000.00 REPAIR OF 31 ROOMS OF 11 SCHOOL BUILDINGS - EVACUATION FACILITY 4,500,000.00 4,500,000.00 EVACUATION FACILITY - 1080 DULAG 4,600,000.00 - - - 1,808,000.00 - 1,292,000.00 - - 600,000.00 - - 1,000,000.00 3,200,000.00 12,500,000.00 VARIOUS DA PROJECTS 4,600,000.00 4,600,000.00 ORGANIC FERTILIZER PRODUCTION - A. RICE HARVESTER - B. WATER IMPOUNDING - TRADING POST - CAPACITY BUILDING PROGRAM FOR CIVIL SOCIETY ORGANIZATIONS (CSOS) 808,000.00 808,000.00 FLOOD CONTROL (CONSTRUCTION OF DRAINAGE STRUCTURE) 1,000,000.00 1,000,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 792,000.00 792,000.00 LIVELIHOOD SKILLS TRAINING PROGRAM 1,000,000.00 1,000,000.00 PROCUREMENT OF MODERN FAMILY PLANNING COMMODITIES 500,000.00 500,000.00 CRISIS CENTER 600,000.00 600,000.00 CONSTRUCTION OF CORE LOCAL ROAD 1,000,000.00 1,000,000.00 PEANUT AND FRUITS PRODUCTION (INTEGRATED COMMUNITY FOOD PRODUCTION) 2,200,000.00 2,200,000.00 1081 HILONGOS 4,090,000.00 - - 650,000.00 3,160,000.00 - - - - 1,000,000.00 - - 500,000.00 3,100,000.00 12,500,000.00 CONSTRUCTION OF TRADING POST 1,950,000.00 1,950,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT PROGRAM 840,000.00 840,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT PROGRAM 800,000.00 800,000.00 INITIATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN 150,000.00 150,000.00 CAPACITY BUILDING FOR CSOS 600,000.00 600,000.00 CONSTRUCTION OF FOOTBRIDGE 2,000,000.00 2,000,000.00 IMPROVEMENT/REPAIR/CONSTRUCTION OF LEVEL I WATER SYSTEM 560,000.00 560,000.00 MICRO-FINANCING FOR IDENTIFIED INDIGENT COOPERATIVE MEMBERS 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 CONCRETING OF CORE LOCAL ROAD 3,100,000.00 3,100,000.00 LIVELIHOOD PROGRAM AND SKILLS TRAINING FOR THE OUT-OF- SCHOOL YOUTH 500,000.00 500,000.00 1082 HINDANG 500,000.00 - - 1,500,000.00 9,400,000.00 - 600,000.00 - - 500,000.00 - - - - 12,500,000.00 REHABILITATION OF MANGROVE AREAS 500,000.00 500,000.00 PROVISION OF BASIC EDUCATION FACILITIES 500,000.00 500,000.00 REHABILITATION & UPGRADING OF HIGH SCHOOL CLASSROOMS (DPWH BLDG.) 1,000,000.00 1,000,000.00 PURCHASE OF DISASTER AND EMERGENCY RESCUE EQUIPMENT 500,000.00 500,000.00 CONSTRUCTION OF SEAWALL 5,500,000.00 5,500,000.00 CONSTRUCTION OF FOOT BRIDGE 2,400,000.00 2,400,000.00 CONSTRUCTION OF RIVER CONTROL 1,000,000.00 1,000,000.00 PURCHASE OF MOSQUITO LARVICIDE FOR MOSQUITO VECTORS OF DENGUE 600,000.00 600,000.00 CONSTRUCTION OF 1 UNIT BRGY. DAYCARE CENTER 500,000.00 500,000.00 1083 INOPACAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF FLOOD CONTROL DIKE 4,750,000.00 4,750,000.00 CONSTRUCTION OF EVACUATION CENTER 4,750,000.00 4,750,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PURCHASE OF RESCUE EQUIPMENT (1 UNIT 4 WHEEL DRIVE VEHICLE AND 1 UNIT DUMPTRUCK 3,000,000.00 3,000,000.00 1084 ISABEL 2,600,000.00 - - 500,000.00 3,200,000.00 - - 900,000.00 - 500,000.00 - - 500,000.00 4,300,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 COLD STORAGE FACILITY 500,000.00 500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS FACILITIES 600,000.00 600,000.00 BASIC EDUCATION FACILITIES: PROVISION OF SCHOOL FURNITURES 500,000.00 500,000.00 FLOOD CONTROL 2,500,000.00 2,500,000.00 COMMUNITY BASED MONITORING SYSTEM (CBMS) 700,000.00 700,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): WORKERS' INCOME AUGMENTATION PROGRAM (WIN AP) 900,000.00 900,000.00 REPAIR OF DAYCARE CENTERS 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION 4,300,000.00 4,300,000.00 TECHICAL VOCATION TRAINING: SMAWAND ELECTRICAL INSTALLATION AND MAINTENANCE 500,000.00 500,000.00 1085 JARO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 EXPANSION OF LEVEL III WATER SUPPLY SYTEM UNDER THE SALINTUBIG PROGRAM (WATER SOURCE: BRGY. RUBAS-CROSSING, JARO, LEYTE) 5,000,000.00 5,000,000.00 EXPANSION OF THE FLOOD CONTROL PROGRAM 7,500,000.00 7,500,000.00 1086 JAVIER 810,000.00 - 1,500,000.00 3,290,000.00 2,000,000.00 - 1,500,000.00 - 1,500,000.00 1,400,000.00 500,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 810,000.00 810,000.00 COCO-BASED BANANA (LACATAN) INTERCROPPING PROJECT - LIVESTOCK PRODUCTION AND TECHNICAL SKILLS TRAINING - AGRO-FORESTRY DEVELOPMENT PROJECT 1,500,000.00 1,500,000.00 PROVISION OF SCHOOL FURNITURES FOR ELEMENTRAY AND SECONDARY SCHOOLS 2,990,000.00 2,990,000.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 CONSTRUCTION OF FLOOD CONTROL FACILITY (BINULHO) 2,000,000.00 2,000,000.00 UPGRADING OF HEALTH FACILITIES/ LABORATORY REQUIREMENTS 1,500,000.00 1,500,000.00 MUNICIPAL AGRO/ ECO TOURISM DEV'T PLAN FORMULATION 1,500,000.00 1,500,000.00 DAY CARE CENTER CONSTRUCTION IN BRGY. INAYUPAN 700,000.00 700,000.00 DAY CARE CENTER CONSTRUCTION IN BRGY. ODIONG 700,000.00 700,000.00 LRED PLANNING AND BPLS ENHANCEMENT 500,000.00 500,000.00 1087 JULITA - - - - 6,000,000.00 - - - - 4,500,000.00 - - - 2,000,000.00 12,500,000.00 FLOOD CONTROL PROGRAM (CUYA-E) 2,000,000.00 2,000,000.00 WATER SYSTEM (HINDANG) 3,000,000.00 3,000,000.00 WATER SYSTEM (STO. NIO) 1,000,000.00 1,000,000.00 SMALL BRIDGE (CUYA-E) 4,500,000.00 4,500,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 1088 KANANGA 1,200,000.00 - - - 11,300,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF RICE MILL AT SITIO CALUBOGAN 1,200,000.00 1,200,000.00 VARIOUS DILG PROJECTS 5,299,280.00 5,299,280.00 CONSTRUCTION OF FLOOD CONTROL - EVACUATION CENTER - IMPROVEMENT OF POTABLE WATER SYSTEM (BRGY. MONTEBELLO) 2,400,000.00 2,400,000.00 TIRE PATH - IMPROVEMENT OF POTABLE WATER SYSTEM (BRGY. LONOY) 1,360,000.00 1,360,000.00 IMPROVEMENT OF POTABLE WATER SYSTEM (BRGY. STO. DOMINGO) 1,040,720.00 1,040,720.00 CONTRUCTION OF WATER SYSTEM (SITIO TANGLE) 1,200,000.00 1,200,000.00 CONSTRUCTION OF DRAINAGE CANAL - FLOOD CONTROL (SITIO DIKE) - 1089 LA PAZ 2,000,000.00 - - 2,000,000.00 5,500,000.00 - - - - 1,500,000.00 - - - 1,500,000.00 12,500,000.00 PROCUREMENT OF FARMTRACTOR 2,000,000.00 2,000,000.00 REPAIR OF CLASSROOMS 2,000,000.00 2,000,000.00 CONSTRUCTION OF FOOTBRIDGES 2,000,000.00 2,000,000.00 PROCUREMENT OF 4WD RESCUE VEHICLE 1,500,000.00 1,500,000.00 REPAIR OF DRAINAGE CANAL 1,000,000.00 1,000,000.00 REPAIR OF BOX CULVERT WITH RIPRAP 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICRO ENTERPRISE DEVELOPMENT TRACK 1,500,000.00 1,500,000.00 CONCRETE ROAD CONSTRUCTION 1,500,000.00 1,500,000.00 1090 LEYTE - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION /REHABILITATION OF SEA WALL 12,500,000.00 12,500,000.00 1091 MACARTHUR 2,875,000.00 - - - 3,803,000.00 - - 572,000.00 - - - - 750,000.00 4,500,000.00 12,500,000.00 A. AGRI-BASED LIVELIHOOD PROGRAM(LIVESTOCK DISPERSAL) 775,000.00 775,000.00 B. AGRI-BASED LIVELIHOOD PROGRAM(VEGETABLE FARMING) 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE 540,000.00 540,000.00 ACQUISITION OF POST HARVEST EQUIPMENTS 560,000.00 560,000.00 ESTABLISHMENT OF AGRO-PROCESSING FACILITIES 500,000.00 500,000.00 FLOOD CONTROL PROJECT 2,503,000.00 2,503,000.00 ACQUISITION OF RESCUE VEHICLE 1,300,000.00 1,300,000.00 SPECIAL PROGRAM FOR THE EMPLOYMENT OF STUDENTS 572,000.00 572,000.00 A. CORE LOCAL ROAD PROJECT(CONCRETING) 3,000,000.00 3,000,000.00 B. CORE LOCAL ROAD PROJECT(CONCRETING) 1,500,000.00 1,500,000.00 LGU PROJECT STILL TO BE IDENTIFIED - COMMUNITY-BASED SKILLS TRAINING FOR THE OSYS 750,000.00 750,000.00 1092 MAHAPLAG - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF FLOOD CONTROL 12,500,000.00 12,500,000.00 1093 MATAG-OB - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF EVACUATION FACILITY 12,500,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 1094 MATALOM 4,500,000.00 - - - 7,500,000.00 - - - - - - - 500,000.00 - 12,500,000.00 CONSTRUCTION OF MUNICIPAL PORT 4,500,000.00 4,500,000.00 CONSTRUCTION OF LEVEL 2 WATER SUPPLY SYSTEM 6,500,000.00 6,500,000.00 ACQUISITION OF RESCUE EQUIPMENT 500,000.00 500,000.00 CAPACITY BUILDING FOR CIVIL SOCIETY ORGANIZATION 500,000.00 500,000.00 SKILLS TRAINING ON HOUSE WIRING INSTALLATION 213,000.00 213,000.00 SKILLS TRAINING ON PLUMBING INSTALLATION 287,000.00 287,000.00 1095 MAYORGA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 EXPANSION OF LEVEL 3 WATER SYSTEM 12,500,000.00 12,500,000.00 1096 MERIDA 3,950,000.00 - - 200,000.00 6,608,000.00 - 942,000.00 - - 800,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,950,000.00 3,950,000.00 MARINE RESERVE AND FISH SANCTUARY REHAB - REHAB OF THE PORT (CAUSEWAY) - MOTORIZED FISHING BOATS AND FISHNETS - FISH PROCESSING - FARM IMPLEMENTS/TOOLS - GULAYAN SA PAARALAN 200,000.00 200,000.00 REHABILITATION/IMPROVEMENT OF LEVEL III POTABLE WATER SYSTEM OF BGY. CAMBALONG & MAHALIT 2,580,000.00 2,580,000.00 FLOOD CONTROL CONSTRUCTION: DRAINAGE CANAL CONSTRUCTION 2,228,000.00 2,228,000.00 RESCUE EQUIPMENT ACQUISITION AND TRAINING FOR RESCUE TEAM MEMBERS 1,800,000.00 1,800,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM/RHMPP - RN HEALS/NURSE DEPLOYMENT PROGRAM - CHT MOBILIZATION AND DEPLOYMENT 942,000.00 942,000.00 SPES - CONSTURUCTION OF THE MERIDA WOMEN'S CRISIS CENTER 800,000.00 800,000.00 1097 ORMOC CITY 14,210,000.00 - 3,000,000.00 3,005,000.00 - - 1,657,500.00 700,000.00 7,427,500.00 - - - - - 30,000,000.00 FISH CAGE & FISH PEN OPERATION 800,000.00 800,000.00 FISH PROCESSING/PRODUCTION TRAINING, PROCESSING, PACKAGING & MARKETING 1,000,000.00 1,000,000.00 FISHERFOLK'S PORTS/WHARVES 2,500,000.00 2,500,000.00 REHABILITATION AND MAINTENANCE OF MARINE RESERVE AREAS AND FISH SANCTUARIES 2,100,000.00 2,100,000.00 ADDITIONAL WATER FACILITIES (WATER PUMPS FOR RAIN-FED RICE FARMERS 560,000.00 560,000.00 LIVELIHOOD PROJECT ON MUD CRAB CULTURE 1,500,000.00 1,500,000.00 TRADING POSTS FOR ORGANIC PRODUCE 3,000,000.00 3,000,000.00 AGRI-FISHERY TRAINING 750,000.00 750,000.00 DAIRY PROCESSING PLANT 2,000,000.00 2,000,000.00 NGP: PAGSANGAAN WATER SHED RESTORATION FOR BIODIVERSITY CONSERVATION PROJECT 3,000,000.00 3,000,000.00 PROVISION OF FURNITURES 405,000.00 405,000.00 MAJOR REPAIR OF CLASSROOMS 1,800,000.00 1,800,000.00 INNOVATIVE PROGRAMS: HONORARIA FOR ALS VOLUNTEERS TEACHERS 800,000.00 800,000.00 CAPABILITY BLDG ON DENGYE CONTROL & PREVENTION 190,000.00 190,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM: UPGRADING OF HEALTH FACILITY & EQUIPMENT TOWARDS ADOPTION OF CLIMATE CHANGE 1,467,500.00 1,467,500.00 INTEGRATED LIVELIHOOD PROJECTS (TAILORING & GARMENT) 700,000.00 700,000.00 PRODUCT DEVELOPMENT & CAPABILITY BUILDING FOR VARIOUS TOURISM LIVELIHOOD OPPORTUNITIES IN LAKE DANAO 2,500,000.00 2,500,000.00 PRODUCT DEVELOPMENT & CAPABILITY BUILDING FOR VARIOUS TOURISM LIVELIHOOD OPPORTUNITIES IN MANGROVE AREAS OF ORMOC 2,000,000.00 2,000,000.00 PRODUCT DEVELOPMENT & CAPABILITY BUILDING FOR VARIOUS TOURISM LIVELIHOOD OPPORTUNITIES IN TONGONAN (LEYTE GEOTHERMAL PRODUCTION FIELD) 1,927,500.00 1,927,500.00 PRODUCT DEVELOPMENT & CAPABILITY BUILDING FOR VARIOUS TOURISM LIVELIHOOD OPPORTUNITIES ON KAN-IDON CAVE 1,000,000.00 1,000,000.00 1098 PALO 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 TRADING POST/"TABO" MARKET COVERED ROAD PHASE II 12,500,000.00 12,500,000.00 1099 PALOMPON 2,200,000.00 - - - 10,300,000.00 - - - - - - - - - 12,500,000.00 TRADING POST-FISH, FRUITS & VEGETABLES CENTER 1,500,000.00 1,500,000.00 BANANA PRODUCTION 700,000.00 700,000.00 WATER SYSTEM EXPANSION PROJECT (TAMBAN SPRING-TINUBDAN- SAN MIGUEL-SABANG-TINABILAN) 10,300,000.00 10,300,000.00 1100 PASTRANA 6,000,000.00 - - 3,000,000.00 - - - - - 1,000,000.00 - - - 2,500,000.00 12,500,000.00 PROCUREMENT OF FARM TRACTORS 4,000,000.00 4,000,000.00 PROCUREMENT OF FARM IMPLEMENT/TOOLS (KNAPSACK SPRAYER) 1,000,000.00 1,000,000.00 PRODUCTION OF ORGANIC FERTILIZER 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FURNITURE (ARM CHAIRS) 3,000,000.00 3,000,000.00 REPAIR/UPGRADING OF DAY CARE CENTERS (BRGYS. OF CANCARAJA, PATONG, GUINDAPUNAN, DIST II AND DIST IV 1,000,000.00 1,000,000.00 BASIC ACCESS INFRASTRUCTURE (ACCESS ROAD-BRGY. GUINDAPUNAN TO TINGIB) 2,500,000.00 2,500,000.00 1101 SAN ISIDRO 3,150,000.00 - 504,000.00 700,000.00 - - 546,000.00 500,000.00 500,000.00 3,400,000.00 700,000.00 - - 2,500,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERIES BASED LIVELIHOOD AND OTHER AGRI- FISHERIES BUSINESS INVESTMENT " DANGGIT PRODUCTION AND DRIED BONELESS DANGGIT PROJECT" 1,650,000.00 1,650,000.00 ACQUISITION OF FISHING BOAT AND FISH NETS 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT "ACQUISITION OF FARM EQUIPMENTS (HAND TRACTOR 4 UNITS)" 500,000.00 500,000.00 ACQUISITION OF COLD STORAGE (VAN) 500,000.00 500,000.00 GREENING PROGRAM 504,000.00 504,000.00 PROVISION OF SCHOOL FURNITURES (SCHOOL SEATS) 700,000.00 700,000.00 REPAIR OF BRGY. PARIL HEALTH STATION AND UPGRADING OF BGY. BASUD HEALTH STATION 546,000.00 546,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INTEGRATED LIVELIHOOD PROGRAM (BAMBOO FURNITURE MAKING AND POT-POT ASSEMBLY SHOP AND SPARE PARTS) 500,000.00 500,000.00 ECO-TOURISM DEVELOPMENT OF SAN ISIDRO 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 1,600,000.00 1,600,000.00 SUSTAINABLE LIVELIHOOD FOR PWD AND SENIOR CITIZENS 500,000.00 500,000.00 CONSTRUCTION OF WOMEN CENTER 800,000.00 800,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DAY CARE CHILDREN AND SUPERVISE NEIGHBORHOOD PLAYGROUND 500,000.00 500,000.00 YAMAN PINOY 700,000.00 700,000.00 CORE LOCAL ROAD CONSTRUCTION 2,500,000.00 2,500,000.00 1102 SAN MIGUEL 1,000,000.00 - - 3,000,000.00 - - - - - 4,000,000.00 - - - 4,500,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT (MOTORIZED FISHING BOAT WITH FISH NET) 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 BASIC EDUCATION FACILITIES PROVISION OF SCHOOL FACILITIES 1,250,000.00 1,250,000.00 STRENGHTENING OF ALS PROGRAM & PROJECTS (EDM & ALS) 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 750,000.00 750,000.00 CONSTRUCTION OF EVACUATION CENTER & PROCUREMENT OF EVACUATION EQUIPMENT 2,500,000.00 2,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICROENTERPRISE DEV. TRACK & EMPLOYMENT FACILITATION TRACK) 1,500,000.00 1,500,000.00 VARIOUS LGU PROJECTS 4,500,000.00 4,500,000.00 RECHANELLING OF SAPINITON RIVER (BAHAY SECTION & CARAYCARAY SECTION) - REBLOCKING & CONCRETING OF MUNICIPAL ROAD (LIBTONG) - CONSTRUCTION OF DRAINAGE CANAL (CAYARE & LIBTONG) - 1103 SANTA FE - - - 1,000,000.00 9,500,000.00 - - - - 2,000,000.00 - - - - 12,500,000.00 REPAIR OF CLASSROOMS 1,000,000.00 1,000,000.00 EXPANSION OF POTABLE WATER CONNECTION (SALINTUBIG)- EXPANSION OF LEVEL II WATER SUPPLY SYSTEM 7,500,000.00 7,500,000.00 INSTALLATION OF 1 UNIT CHECK GATE(CONSTRUCTION OF FLOOD CONTROL ) 2,000,000.00 2,000,000.00 CONSTRUCTION OF PROTECTIVE CENTER FOR VICTIMS OF DOMESTIC VIOLENCE, CALAMITIES, ETC. IN NEED OF COUNSELLING, STRESS DEBRIEFING,AND OTHERS 2,000,000.00 2,000,000.00 1104 TABANGO 1,750,000.00 - - 1,000,000.00 2,750,000.00 - 2,000,000.00 - 1,000,000.00 4,000,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 1,750,000.00 1,750,000.00 ESTABLISHMENT OF ORGANIC FERTILIZER PROCESSING FACILITY. - CONSTRUCTION OF PALAY SHED - REHABILITATION OF THE MUNICIPAL PLANT NURSERY AND ESTABLISHMENT OF BARANGAY PLANT NURSERY - PROVISION OF ARMCHAIRS FOR IDENTIFIED ELEMENTARY SCHOOLS IN TABANGO, LEYTE 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 2,750,000.00 2,750,000.00 CONSTRUCTION OF AN EVACUATION CENTER - CONSTRUCTION OF FLOOD CONTROL/ DRAINAGE SYSTEM FOR BRGYS. CAMPOKPOK, POBLACION, TABING, TUGAS AND GIBACUNGAN - BARANGAY HEALTH FACILITY ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 ESTABLISHMENT OF VISITOR INFORMATION CENTER/ TOURISM CENTER 1,000,000.00 1,000,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER FOR TABANGO, LEYTE 2,000,000.00 2,000,000.00 UPGRADING OF THE 13 DAY CARE CENTERS IN TABANGO, LEYTE 1,500,000.00 1,500,000.00 ENTREPRENEURIAL OR LIVELIHOOD ACTIVITY FOR THE SENIOR CITIZENS (BUY AND SELL OF RECYCLABLE MATERIALS) 500,000.00 500,000.00 1105 TABONTABON - - - - - - 1,500,000.00 - - 11,000,000.00 - - - - 12,500,000.00 HEALTH FACILITY ENHANCEMENT 750,000.00 750,000.00 INFECTIOUS DISEASE CONTROL AND ELIMINATION 750,000.00 750,000.00 VARIOUS KC PROJECTS 11,000,000.00 11,000,000.00 CONSTRUCTION OF 200 L.M SOIL EROSION PROTECTION (GABION) - CONSTRUCTION OF 150 L.M SOIL EROSION PROTECTION (GABION) - CONSTRUCTION OF CRISES CENTER/CUM EVACUATION CENTER - 1106 TACLOBAN CITY 19,500,000.00 - - - - - - 4,000,000.00 - - 6,000,000.00 - - - 29,500,000.00 TRADING POST 12,400,000.00 12,400,000.00 PRODUCTION OF ORGANIC SEEDS AND PLANTING MATERIALS 500,000.00 500,000.00 ACQUISITION OF FARM EQUIPMENT 2,500,000.00 2,500,000.00 MULTIPLIER FARM OF ORGANIC ANIMALS 3,500,000.00 3,500,000.00 NATURAL FARM INPUT/VERMI COMPOSTING 600,000.00 600,000.00 LIVELIHOOD SUPPORT PROJECT FOR TRANSPORT GROUP 4,000,000.00 4,000,000.00 YAMAN PINOY 3,200,000.00 3,200,000.00 SKILLS TRAINING AND PRODUCT ENHANCEMENT 800,000.00 800,000.00 LIVELIHOOOD PROGRAM FOR THE PWDS AND OTHER VULNERABLE SECTORS 2,000,000.00 2,000,000.00 1107 TANAUAN 500,000.00 1,200,000.00 - 2,000,000.00 7,800,000.00 - 500,000.00 - - 500,000.00 - - - - 12,500,000.00 CONSTRUCTION OF IRRIGATION FACILITIES (BRGY. BARAS) 1,200,000.00 1,200,000.00 ESTABLISHMENT OF AQUASILVI & SEAWEEDS FARM 500,000.00 500,000.00 REPAIR OF SCHOOL BUILDINGS 2,000,000.00 2,000,000.00 POTABLE WATER SUPPLY 3,500,000.00 3,500,000.00 CONSTRUCTION OF DRAINAGE AND CANALS 4,300,000.00 4,300,000.00 INFECTIOUS DISEASE CONTROL AND ELIMINATION 500,000.00 500,000.00 UPGRADE OF DAY CARE CENTERS 500,000.00 500,000.00 1108 TOLOSA 1,500,000.00 - - 500,000.00 7,300,000.00 - - 500,000.00 - 2,200,000.00 - - 500,000.00 - 12,500,000.00 ANIMAL PRODUCTION FARM 500,000.00 500,000.00 MARINE PROTECTED AREA ENHANCEMENT AND PROTECTION 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 ALTERNATIVE LEARNING SYSTEM ACCREDITATION AND EQUIVALENCY (ALS A & E) 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 6,800,000.00 6,800,000.00 RESCUE EQUIPMENT 500,000.00 500,000.00 WORKERS INCOME AUGMENTATION PROGRAM 500,000.00 500,000.00 CONDUCT OF BASIC AND ADVANCE CAPABILITY BUILDING PROGRAM 600,000.00 600,000.00 MINI GROCERY 500,000.00 500,000.00 EXPANSION OF POTABLE WATER SUPPLY 600,000.00 600,000.00 REHABILITATION OF DAY CENTER FOR SENIOR CITIZENS 500,000.00 500,000.00 LIVELIHOOD SKILLS TRAINING 500,000.00 500,000.00 1109 TUNGA 2,400,000.00 - - - 2,750,000.00 - 500,000.00 - - 6,350,000.00 500,000.00 - - - 12,500,000.00 AGRO-PROCESSING FACILITIES & EXPANDED AGRI-BUSINESS ACTIVITIES (ORGANIC VEGETABLE BREAD PRODUCTION; SOYA BEAN PRODUCTION; FOOD PROCESSING & PRESERVATIVES; HANDICRAFTS) 800,000.00 800,000.00 ORGANIC FERTILIZER PRODUCTION & FACILITY 500,000.00 500,000.00 ESTABLISHMENT OF POST HARVEST FACILITIES & EQUIPMENT (MECHANICAL DRYERS & BODEGAS) 500,000.00 500,000.00 PROCUREMENT OF VEGETABLE SEEDS AND GARDENING TOLLS/ESTABLISHMENT OF MUNICIPAL NURSERY AND SEED BANK 600,000.00 600,000.00 CAPACITY BUILDING PROGRAM FOR CSOS 500,000.00 500,000.00 CONSTRUCTION OF BARANGAY BANAWANG WATER SYSTEM (LEVEL 2) 500,000.00 500,000.00 CONSTRUCTION OF DRAINAGE CANALS 500,000.00 500,000.00 IMPROVEMENT AND REHABILITATION OF MUNICIPAL SLAUGHTER HOUSE 750,000.00 750,000.00 PROCUREMENT OF RESCUE EQUIPMENT (AS PRESCRIBED BY OCD) 500,000.00 500,000.00 STRENGTHENING OF COMMUNITY HEALTH TEAMS 500,000.00 500,000.00 CONSTRUCTION OF MUNICIPAL EVACUATION CENTER 5,350,000.00 5,350,000.00 SUSTAINABLE LIVELIHOOD PROGRAMS (E.G. HOG/SWINE RAISING. NATIVE CHICKEN RAISING & DRESS MAKING) 500,000.00 500,000.00 UPGRADING OF DAY CARE CENTERS (INCLUDES HANDWASHING FACILITY) 500,000.00 500,000.00 FORMULATION OF MUNICIPAL ECONOMIC DEVELOPMENT AND INVESTMENT PLAN 500,000.00 500,000.00 1110 VILLABA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF STANDARD EVACUATION FACILITY 12,500,000.00 12,500,000.00 NORTHERN SAMAR 73,447,000.00 3,000,000.00 3,000,000.00 17,361,500.00 131,247,000.00 4,000,000.00 13,574,000.00 3,500,000.00 4,350,000.00 1,500,000.00 8,525,000.00 3,550,000.00 2,695,000.00 43,548,000.00 313,297,500.00 1111 ALLEN 4,800,000.00 - - - 1,200,000.00 - 500,000.00 - 2,450,000.00 - 500,000.00 - 500,000.00 2,550,000.00 12,500,000.00 CONSTRUCTION OF WHARF PHASE I 3,300,000.00 3,300,000.00 AGRO PROCESSING FACILITIES & EXPANDED AGRI BUSINESS BUSINESS ACTIVITIES A. ACQUISITION OF MINI FEEDMILL MACHINERIES B. TRAINING FOR ORGANIC FEEDS (HOGS/POULTRY/FISH) 1,000,000.00 1,000,000.00 ARTIFICIAL CORAL REEF SANCTUARY PHASE 2 500,000.00 500,000.00 EVACUATION CENTER PHASE I 1,200,000.00 1,200,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM A.) REHABILITATION OF BARANGAY HEALTH STATION 500,000.00 500,000.00 VISITORS INFORMATION CENTER A. TRAINING FOR FRONT LINERS PERSONNEL B. CONSTRUCTION OF TOURIST COMFORT ROOMS C. CONSTRUCTION OF TOURIST PASALUBONG CENTER 2,450,000.00 2,450,000.00 MICRO ENTERPRISE A.SWEET DELICACIES TRAINING B. SWEET DELICACIES PRODUCTION 500,000.00 500,000.00 VARIOUS ROAD PROJECTS 2,550,000.00 2,550,000.00 CORE ROAD CONSTRUCTION - CORE ROAD CONSTRUCTION - SKILLS TRAINING PROGRAM 500,000.00 500,000.00 1112 BIRI 1,750,000.00 - - 1,700,000.00 5,250,000.00 - 1,000,000.00 - 500,000.00 500,000.00 500,000.00 1,300,000.00 - - 12,500,000.00 VARIOUS FISHERY PROJECTS 1,150,000.00 1,150,000.00 FISH NETS - MOTORIZED FISHING BOATS - SUSTAINABLE AGRI-FISHERY LIVELIHOOD AND AGRI-FISHERY BUSINESS INVESTMENTS - POST HARVEST FACILITIES AND EQUIPMENTS 600,000.00 600,000.00 REPAIR OF CLASSROOMS 1,000,000.00 1,000,000.00 ABOT-ALAM PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 VARIOUS DILG PROJECTS 2,250,000.00 2,250,000.00 RESCUE EQUIPMENT - EVACUATION FACILITY - SALINTUBIG PROGRAM 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 PRODUCT TOURISM DEVELOMENT AND MICRO TOURISM BUSINESS 500,000.00 500,000.00 FEEDING PROGRAM 500,000.00 500,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 BRGY LINE ENHANCEMENT PROGRAM 1,300,000.00 1,300,000.00 1113 BOBON 6,500,000.00 - - - 5,500,000.00 - - 500,000.00 - - - - - - 12,500,000.00 SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT PROVISION OF MOTORIZED FISHING BOATS AND FISH NETS 500,000.00 500,000.00 POST HARVEST FACILITIES AND EQUIPMENT (MECHANICAL DRYER) 1,000,000.00 1,000,000.00 CONSTRUCTION OF TRADING POST AND FOOD TERMINAL 5,000,000.00 5,000,000.00 COMPLETION OF EVACUATION CENTER 5,500,000.00 5,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS DOLE INTEGRATED LIVELIHOOD PROGRAM (DLIP)- TULONG PANGHANAPBUHAY SA ATING MGA DISADVANTAGE WORKERS (TUPAD) 500,000.00 500,000.00 1114 CAPUL - - - - 3,000,000.00 - - - 750,000.00 - - 2,250,000.00 - 6,500,000.00 12,500,000.00 SALINTUBIG 3,000,000.00 3,000,000.00 IMPROVEMENT OF TOURISM INFORMATION CENTER 750,000.00 750,000.00 CORE LOCAL ROAD CONSTRUCTION 6,500,000.00 6,500,000.00 BRGY LINE ENHANCEMENT PROGRAM 2,250,000.00 2,250,000.00 1115 CATARMAN (CAPITAL) - - - - 17,500,000.00 - - - - - - - - 6,000,000.00 23,500,000.00 CONSTRUCTION/IMPROVEMENT OF EVACUATION CENTER 12,500,000.00 12,500,000.00 REHABILITATION/ EXPANSION/ UPGRADING OF LEVEL II WATER SUPPLY SYSTEM WITH APPROPRIATE WATER TREATMENT SYSTEM 4,000,000.00 4,000,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM WITH APPROPRIATE WATER TREATMEN SYSTEM 1,000,000.00 1,000,000.00 CORE LOCAL ROADS CONSTRUCTION, REHABILITATION AND MAINTENANCE 6,000,000.00 6,000,000.00 1116 CATUBIG 6,900,000.00 3,000,000.00 - 600,000.00 1,500,000.00 - - - - 500,000.00 - - - - 12,500,000.00 PROVISION OF FARM IMPLEMENTS (SUPPORT TO VEGETABLE PRODUCTION) 2,000,000.00 2,000,000.00 VARIOUS DA PROJECTS 4,900,000.00 4,900,000.00 IRRIGATION FACILITIES - ORGANIC FERTILIZER PRODUCTION - CAGE CULTURE OF POKOT (ULANG) - POST HARVEST FACILITIES - AMENDMENT & REDESIGNING OF IRAWAHAN & SAGUDSORON IRRIGATION FAC 3,000,000.00 3,000,000.00 REPAIR/ REHAB OF SCHOOL BLDG 600,000.00 600,000.00 POTABLE WATER SYSTEM 1,500,000.00 1,500,000.00 FUNDING ASSISTAANCE/CAPITAL (COCO-WATER VINEGAR MAKING) 500,000.00 500,000.00 1117 GAMAY - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS WATER PROJECTS 12,500,000.00 12,500,000.00 PROVISION OF WATER SUPPLY FOR WATERLESS BARANGAY - PROVISION OF WATER SUPPLY FOR WATERLESS BARANGAY - PROVISION OF WATER SUPPLY FOR WATERLESS BARANGAY - PROVISION OF WATER SUPPLY FOR WATERLESS BARANGAY - PROVISION OF WATER SUPPLY FOR WATERLESS BARANGAY - 1118 LAOANG 5,320,000.00 - - - 5,030,000.00 - - - - - 2,100,000.00 - - 5,050,000.00 17,500,000.00 PROVISION OF MOTOR BOAT (MOTHER BOAT) 3,000,000.00 3,000,000.00 IRRIGATION PROJECTS 1,000,000.00 1,000,000.00 PROVISION OF TRACTORS, CARABAO, THRESHER 520,000.00 520,000.00 COMMUNITY BASED SEAWEED FARMING 800,000.00 800,000.00 EVACUATON CENTER 3,520,000.00 3,520,000.00 POTABLE WATER SUPPLY 1,510,000.00 1,510,000.00 YAMANG PINOY 1,400,000.00 1,400,000.00 NEWDESIGN OF PUMP BOAT AND CAPDEV TRAINING 700,000.00 700,000.00 CORE LOCAL ROAD CONSTRUCTION 5,050,000.00 5,050,000.00 1119 LAPINIG 8,500,000.00 - - - 3,500,000.00 - - - - - - - 500,000.00 - 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT 4,500,000.00 4,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER BUSINESS INVESTMENTS 4,000,000.00 4,000,000.00 SALINTUBIG 3,500,000.00 3,500,000.00 TECHNICAL-VOCATIONAL/ COMMUNITY-BASED TRAINING 500,000.00 500,000.00 1120 LAS NAVAS - - - - 10,700,000.00 - - - - - 1,800,000.00 - - - 12,500,000.00 VARIOUS WATER PROJECTS 10,700,000.00 10,700,000.00 CONST. OF WATER SUPPLY (LEVEL II) - CONST. OF WATER SUPPLY (LEVEL II) - CONST. OF WATER SUPPLY (LEVEL II) - CONST. OF WATER SUPPLY (LEVEL II) - CONST. OF WATER SUPPLY (LEVEL II) - CONST. OF WATER SUPPLY (LEVEL II) - CONST. OF WATER SUPPLY (LEVEL II) - RE-CONSTRUCTION OF WATER SUPPLY - RE-CONSTRUCTION OF WATER SUPPLY - REHABILITATION OF WATER SUPPLY - REHABILITATION OF WATER SUPPLY - ADDITIONAL SITE OF WATER RESOURCE AT 1.8 KM FROM THE SOURCE - RURAL MICRO ENTERPRISE DEVT. PROGRAM 1,800,000.00 1,800,000.00 1121 LAVEZARES 7,500,000.00 - - 500,000.00 3,000,000.00 - - - - - - - - 1,500,000.00 12,500,000.00 IRRIGATIONS PROJECTS (SIP/STW/OSP) 5,000,000.00 5,000,000.00 INFRASTRUCTURE SUPPORT TO AGRI AND FISHERY PRODUCTION 2,000,000.00 2,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGI- FISHERY BUSINESS INVESTMENT 500,000.00 500,000.00 BASIV EDUCATION FACILITIES: PROVISION OF SCHOOL FURNITURE 500,000.00 500,000.00 RESCUE EQUIPMENT 1,000,000.00 1,000,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 SALINTUBIG 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION 1,500,000.00 1,500,000.00 1122 LOPE DE VEGA 3,800,000.00 - - 1,650,000.00 4,609,000.00 - 1,746,000.00 - - - - - 195,000.00 500,000.00 12,500,000.00 TRAMLINES 2,000,000.00 2,000,000.00 MECHANICAL DRYER 800,000.00 800,000.00 FARM IMPLEMENTS & TOOLS 500,000.00 500,000.00 IRRIGATION PROJECT 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR OF SCHOOL BUILDING & COMFORT ROOMS (HIGH SCHOOL) 500,000.00 500,000.00 REPAIR OF SEVEN (7) CLASSROOMS & COMFORT ROOMS 1,150,000.00 1,150,000.00 FLOOD CONTROL 700,000.00 700,000.00 EVACUATION CENTER/FACILITY 1,000,000.00 1,000,000.00 RESCUE EQUIPMENT 1,300,000.00 1,300,000.00 EXPANSION OF LEVEL II WATER SUPPLY SYSTEM 1,609,000.00 1,609,000.00 RNHEALS 1,746,000.00 1,746,000.00 PROJECTS TO BE IDENTIFIED 500,000.00 500,000.00 COMMUNITY-BASED SKILLS TRAINING FOR OSY 195,000.00 195,000.00 1123 MAPANAS - - - 2,100,000.00 - - - - - - - - 500,000.00 9,900,000.00 12,500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 2,100,000.00 2,100,000.00 CONCRETING OF CORE LOCAL ROADS 9,900,000.00 9,900,000.00 SKILLS TRAINING 500,000.00 500,000.00 1124 MONDRAGON 3,500,000.00 - - 5,000,000.00 4,000,000.00 - - - - - - - - - 12,500,000.00 INFRA SUPPORT TO AGRI-PRODUCTION 2,000,000.00 2,000,000.00 INFRA SUPPORT TO FISHERY PRODUCTION 1,500,000.00 1,500,000.00 REPAIR /REHAB OF CLASSROOM 2,500,000.00 2,500,000.00 REPAIR /REHAB OF CLASSROOM/CL (PREP) 2,500,000.00 2,500,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF FLOOD CONTROL - CONSTRUCTION OF HEALTH CENTER - SALINTUBIG 1,500,000.00 1,500,000.00 1125 PALAPAG 4,500,000.00 - - - 8,000,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DA PROJECTS 4,500,000.00 4,500,000.00 CONTINUATION OF MUNICIPAL FISH PORT - AVAILMENT/PROCUREMENT OF FARM MACHINERIES - AVAILMENT/PROCUREMENT OF MOBILE RICE MILL - LIVELIHOOD DEV'T PROG. OF NABATASAN LAKE (MARICULTURE PARK) - CONSTRUCTION OF WATER SYSTEM LEVEL II 8,000,000.00 8,000,000.00 1126 PAMBUJAN 2,575,000.00 - - 635,000.00 5,108,000.00 - 2,057,000.00 - - - 2,125,000.00 - - - 12,500,000.00 FARM EQUIPMENTS FOR RICE PRODUCTION ENHANCMENT 875,000.00 875,000.00 MINI LAWAGAN 1,700,000.00 1,700,000.00 SCHOOL FURNITURES 635,000.00 635,000.00 PROCUREMENT OF DISATER RESPONSE AND RESCUE EQUIPMENTS AND DRR MANAGEMENT INFORMATION SYSTEM (MIS) EQUIPMENTS 1,198,000.00 1,198,000.00 SALINTUBIG 3,910,000.00 3,910,000.00 UPGRADING OF BARANGAY HEALTH STATION 2,057,000.00 2,057,000.00 YAMAN PINOY 2,125,000.00 2,125,000.00 1127 ROSARIO 2,500,000.00 - 1,000,000.00 1,000,000.00 5,500,000.00 - 1,000,000.00 500,000.00 - - - - 500,000.00 - 12,000,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 1.COCONUT INDUSTRY 1,000,000.00 1,000,000.00 MOTORIZED FISHING BOATS AND FISHING NETS (INFRASTRUCTURE SUPPORT TO AGRI AND FISHERY PRODUCTION) 1,000,000.00 1,000,000.00 SHREDDER AND EQUIPMENT FACILITY 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FACILITIES ACQUISITON OF SEATS/CHAIRS 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 E. FLOOD CONTROL (PHASE I) - F. EVACUATION CENTER - SPRING DEVELOPMENT LEVEL II 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 MUD CRAB FATTENING 500,000.00 500,000.00 SKILL TRAINING 500,000.00 500,000.00 1128 SAN ANTONIO - - 2,000,000.00 2,022,500.00 4,500,000.00 - 1,125,000.00 - 650,000.00 - - - - - 10,297,500.00 NATIONAL GREENING PROGRAM (NGP) 2,000,000.00 2,000,000.00 GULAYAN SA PAARALAN 90,000.00 90,000.00 REPAIR/REHABILITATION OF CLASSROOMS 1,932,500.00 1,932,500.00 SAGAN AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG)- PROVISION OF POTABLE WATER SUPPLY 4,500,000.00 4,500,000.00 BEMONC TRAINING 125,000.00 125,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 LOCAL TOURISM DEVELOPMENT PROJECTS 650,000.00 650,000.00 1129 SAN ISIDRO - - - 504,000.00 11,350,000.00 - 646,000.00 - - - - - - - 12,500,000.00 BASIC EDUCATION FACILITIES- PROVISION OF SCHOOL FURNITURE 504,000.00 504,000.00 VARIOUS DILG PROJECTS 8,350,000.00 8,350,000.00 EVACUATION FACILITY - RESCUE EQUIPMENT - FLOOD CONTROL - CONSTRUCTION OF SLAUGHTER HOUSE 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 646,000.00 646,000.00 1130 SAN JOSE 3,802,000.00 - - 650,000.00 4,000,000.00 - - 1,000,000.00 - - 1,500,000.00 - 500,000.00 1,048,000.00 12,500,000.00 IRRIGATION PROJECT (SHALLOWTUBE WELL) 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT ( MOTORIZED FISHING BOATS & FISH NETS) 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTORS) 500,000.00 500,000.00 COLD STORAGE FACILITIES/VANS 500,000.00 500,000.00 SUSTAINABLE AGRI- FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 500,000.00 500,000.00 SUSTAINABLE AGRI- FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 500,000.00 500,000.00 MARINE RESERVE AND FISH SANCTUARIES 802,000.00 802,000.00 BASIC EDUCATION FACILITIES: REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 GULAYAN SA PAARALAN 150,000.00 150,000.00 FLOOD CONTROL 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION /EXPANSION OF THE MUNICIPAL BUILDING TO HOUSE VARIOUS NATIONAL OFFICES IN THE LGU SUCH AS MTC, DILG, DSWD, AND OTHER AGENCIES. 3,000,000.00 3,000,000.00 SALINTUBIG PROGRAM - PROVISION OF POTABLE WATER SUPPLY 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROFGRAMS (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROFGRAMS (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) 500,000.00 500,000.00 YAMAN PINOY 500,000.00 500,000.00 YAMAN PINOY 500,000.00 500,000.00 YAMAN PINOY 500,000.00 500,000.00 CORE LOCAL CONSTRUCTION/REHABILITATION OF BRGY. GENGAROG FOOTBRIDGE 500,000.00 500,000.00 PROJECTS TO BE IDENTIFIED 548,000.00 548,000.00 TECHNICAL VOCATION TRAINING/ COMMUNITY- BASED TRAINING: BREAD AND PASTRY, COMPUTER HARDWARE & SERVICING, AND PLUMBING 500,000.00 500,000.00 1131 SAN ROQUE 3,500,000.00 - - - 7,500,000.00 - 1,500,000.00 - - - - - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED AND OTHER AGRI-FISHERY INVESTMENT 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY DEVELOPMENT 500,000.00 500,000.00 PROVISION OF FISH PORT AND STORAGE FACILITY 2,500,000.00 2,500,000.00 EVACUATION CENTER 2,500,000.00 2,500,000.00 POTABALE WATER FOR BARANGAYS LAWAAN, COROCONOG, GINAGDANAN AND POBLACION 5,000,000.00 5,000,000.00 UPGRADING OF BARANGAY PAGSANG-AN BIRTHING FACILITY/BRGY HEALTH STATION 1,500,000.00 1,500,000.00 1132 SAN VICENTE 4,000,000.00 - - - 3,000,000.00 4,000,000.00 500,000.00 1,000,000.00 - - - - - - 12,500,000.00 MARINE SANCTUARY PROJECT 2,500,000.00 2,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM A. FOR FISHERFOLK - DA 1,500,000.00 1,500,000.00 LEVEL 2 WATER SUPPLY SYSTEM 3,000,000.00 3,000,000.00 ELECTRIFICATION PROGRAM 4,000,000.00 4,000,000.00 COMMUNITY HEALTH TEAMS CAPACITY BUILDING, TRAINING, AND SUPPORT 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM B.FOR FARMERS, AND HANDICRAFT WORKERS - DOLE 1,000,000.00 1,000,000.00 1133 SILVINO LOBOS - - - 500,000.00 - - 1,500,000.00 - - - - - - 10,500,000.00 12,500,000.00 BASIC EDUCATION FACILITIES REPAIR/RHABILITATION OF CLASSROOMS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCE MENT PROGRAM 1,500,000.00 1,500,000.00 CORE LOCAL ROAD: CONSTRUCTION OF CIRCUMFERENTIAL ROAD 10,500,000.00 10,500,000.00 1134 VICTORIA 4,000,000.00 - - 500,000.00 5,000,000.00 - 2,000,000.00 500,000.00 - 500,000.00 - - - - 12,500,000.00 ACQUISITION OF MOTORIZED FISHING BOATS AND FISHING PARAPHERNALIA 2,050,000.00 2,050,000.00 ACQUISITION OF 1 UNIT FIRST CLASS RUBBERIZED RICE MILL 750,000.00 750,000.00 ESTABLISHMENT OF FISH CAGE 700,000.00 700,000.00 PURCHASE OF ROTARY WEEDER 500,000.00 500,000.00 PURCHASE OF ARM CHAIRS FOR ELEM., HIGH SCHOOL & KINDERGARTEN 500,000.00 500,000.00 VARIOUS DILG PROJECTS 5,000,000.00 5,000,000.00 A. CONSTRUCTION OF CHB LINED CANAL WITH CONCRETE COVER ( ELEM. & HIGH SCHOOL) - B. CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT - C. CONSTRUCTION OF SEA WALL - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION/REPAIR/IMPROVEMENT OF BARANGAY HEALTH STATIONS 1,000,000.00 1,000,000.00 ACQUISITION OF DENTAL CHAIR WITH ACCESSORIES 500,000.00 500,000.00 NUTRITION FEEDING 500,000.00 500,000.00 ACQUISITION OF SIDE CAR (BOX TYPE) 500,000.00 500,000.00 PURCHASE OF INSTRUCTIONAL MATERIALS & FURNITURES/FACILITIES FOR DAY CARE CENTERS 500,000.00 500,000.00 SAMAR 54,336,000.00 - 3,850,000.00 22,217,100.00 113,645,710.00 7,000,000.00 28,103,150.00 2,500,000.00 730,800.00 33,309,790.00 948,500.00 3,000,000.00 3,578,950.00 76,780,000.00 350,000,000.00 1135 ALMAGRO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF LEVEL III WATER SYSTEM 12,500,000.00 12,500,000.00 1136 BASEY - - - 2,000,000.00 5,051,500.00 - - 500,000.00 - 3,500,000.00 948,500.00 - - - 12,000,000.00 GULAYAN SA PAARALAN 600,000.00 600,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION 1,400,000.00 1,400,000.00 SALINTUBIG PROJECT 2,351,500.00 2,351,500.00 REHABILITATION OF MUNICIPAL DRAINAGE SYSTEM (FLOOD CONTROL) 2,700,000.00 2,700,000.00 OFWS REINTEGRATION PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF BARANGAY DAY CARE CENTER 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROJECT 2,000,000.00 2,000,000.00 ESTABLISHMENT OF PWD SHELTERED WORKSHOP AND AREA VOCATIONAL REHABILITATION CENTER 500,000.00 500,000.00 OTOP STORE EXPRESS 948,500.00 948,500.00 1137 CALBAYOG CITY 7,000,000.00 - - 4,500,000.00 4,000,000.00 - 7,500,000.00 - - 7,000,000.00 - - - - 30,000,000.00 INSTALLATION OF PAYAO PROJECT 1,000,000.00 1,000,000.00 ESTABLISH FISH SANCTUARY 500,000.00 500,000.00 VARIOUS DA PROJECTS 5,500,000.00 5,500,000.00 PROCUREMENT OF WATER PUMP - PROCUREMENT OF BARANGAY DAGAT PATROL BOAT - MULTI-CROPPING PROJECT - PROCUREMENT OF MOTORIZED BOAT - GULAYAN SA PAARALAN 1,500,000.00 1,500,000.00 REPAIR AND REHABILITATION OF CLASSROOM 3,000,000.00 3,000,000.00 WATER SYSTEM 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF DRAINAGE 2,000,000.00 2,000,000.00 CONSTRUCTION OF WATER SEALED TOILET 4,000,000.00 4,000,000.00 CONDUCT OF COMMUNITY LED TOTAL SANITATION 500,000.00 500,000.00 UPGRADING OF CLINICAL LABORATORY 1,500,000.00 1,500,000.00 UPGRADING OF BLOOD BANK 1,500,000.00 1,500,000.00 ENHANCEMENT OF WOMAN AND CHILD FRIENDLY FACILITY 1,000,000.00 1,000,000.00 BAHAY PAG-ASA FOR CICL 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 3,500,000.00 3,500,000.00 FUNCTIONAL LITERACY PROGRAM 1,000,000.00 1,000,000.00 1138 CALBIGA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 ESTABLISHMENT OF FULLY-EQUIPPED EVACUATION FACILITY 2,500,000.00 2,500,000.00 ACQUISITION OF RESCUE EQUIPMENT AND SUPPORT FACILITY 5,000,000.00 5,000,000.00 FLOOD CONTROL/ACQUISITION OF A RIVER DREDGING EQUIPMENT 5,000,000.00 5,000,000.00 1139 CITY OF CATBALOGAN (CAPITAL) 3,940,000.00 - - 4,600,000.00 2,875,210.00 - 3,000,000.00 - - 6,084,790.00 - - - - 20,500,000.00 IRRIGATION PROJECT 540,000.00 540,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER FISHERY BUSINESS INVESTMENT 3,400,000.00 3,400,000.00 BASIC EDUCATION FACILITIES: REPAIR AND REHABILITAION OF CLASSROOMS 3,100,000.00 3,100,000.00 BASIC EDUCATION FACILITIES: PROVISION OF SCHOOL FURNITURES 1,500,000.00 1,500,000.00 CONSTRUCTION OF EVACUATION CENTER 2,875,210.00 2,875,210.00 REHABILITATION OF MAIN HEALTH CENTER 3,000,000.00 3,000,000.00 ESTABLISHMENT OF BAHAY PAG-ASA 3,084,790.00 3,084,790.00 SUSTAINABLE LIVELIHOOD PROGRAM TO OUT-GOING 4P'S 3,000,000.00 3,000,000.00 1140 DARAM - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 REHABILITATION OF LOCAL CORE ROAD 12,500,000.00 12,500,000.00 1141 GANDARA 2,000,000.00 - 850,000.00 - 9,650,000.00 - - - - - - - - - 12,500,000.00 PRE AND POST HARVEST FACILITIES AND EQUIPMENTS 1,000,000.00 1,000,000.00 FARM IMPLEMENTS/TOOLS 1,000,000.00 1,000,000.00 GREENING PROGRAM (PLANTING OF ONE MILLION TREES) 850,000.00 850,000.00 CONSTRUCTION OF WATER SYSTEM FOR THE FIVE (5) POBLACION BARANGAYS 7,000,000.00 7,000,000.00 CONSTRUCTION OF DRAINAGE CANAL WITH COVER IN POBLACION BARANGAYS 2,650,000.00 2,650,000.00 1142 HINABANGAN 500,000.00 - 1,000,000.00 1,000,000.00 500,000.00 - - 1,500,000.00 - - - - 500,000.00 7,500,000.00 12,500,000.00 PROVISION OF FISING GEARS 500,000.00 500,000.00 MANGROVE REFORESTATION 500,000.00 500,000.00 MANGROVE GREENING PROJECT 500,000.00 500,000.00 REPAIR AND REHABILITATION OF CLASSROOM 500,000.00 500,000.00 PROVISION OF ARMCHAIRS 500,000.00 500,000.00 SALINTUBIG 500,000.00 500,000.00 ESTABLISHMENT OF MINI GROCERY 500,000.00 500,000.00 CAPITAL ASSISTANCE FOR FRUITS AND VEGETABLES 500,000.00 500,000.00 ANIMAL PRODUCTION FARM 500,000.00 500,000.00 CORE ROAD CONCRETING 7,500,000.00 7,500,000.00 SKILLS TRAINING ON COSMETOLOGY AND DRESSMAKING 500,000.00 500,000.00 1143 JIABONG - - - - 6,000,000.00 - - - - - - - - 6,500,000.00 12,500,000.00 REHABILITATION OF BARANGAY JIA-AN WATERWORKS SYSTEM 500,000.00 500,000.00 REHABILITATION OF BARANGAY PARINA WATERWORKS SYSTEM 500,000.00 500,000.00 VARIOUS DILG PROJECTS 5,000,000.00 5,000,000.00 IMPROVEMENT OF DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL IN BARANGAY JIA-AN - CONSTRUCTION OF FLOOD CONTROL IN BARANGAY MACABETAS - PROCUREMENT OF LGU RESCUE/DISASTER EQUIPMENT - CORE ROAD CONCRETING IN BARANGAY MASAGANA 1,500,000.00 1,500,000.00 CORE ROAD CONCRETING IN BARANGAY TAGBAYAON 1,000,000.00 1,000,000.00 CONSTRUCTION OF REINFORCED CONCRETE FOOTBRIDGE IN BARANGAY BAWANG 2,000,000.00 2,000,000.00 CORE ROAD CONCRETING ALONG MUNICIPAL GOVERNMENT CENTER 2,000,000.00 2,000,000.00 1144 MARABUT 6,500,000.00 - - - 4,500,000.00 - 500,000.00 - - 500,000.00 - - - 500,000.00 12,500,000.00 FISH LANDING CENTER 1,500,000.00 1,500,000.00 MARINE RESERVE AND FISH SANCTUARY 2,000,000.00 2,000,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO AGRI & FISHERY PRODUCTION & DEVELOPMENT (UPLAND TRACTOR) 1,500,000.00 1,500,000.00 AGRO-PROCESSING FACILITY AND EXPANDED AGRI-BUSINESS ACTIVITIES (CARB MEAT PROCESSING CENTER) 500,000.00 500,000.00 EVACUATION FACILITY 2,500,000.00 2,500,000.00 SALINTUBIG 2,000,000.00 2,000,000.00 INFECTIOUS AND NON INFECTIOUS DISEASE CONTROL 500,000.00 500,000.00 WOMEN AND CHILDREN PROTECTION CENTER FOR VICTIMS AND ABUSE AND 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 1145 MATUGUINAO - - 2,000,000.00 2,000,000.00 2,000,000.00 - 1,500,000.00 - - 1,000,000.00 - 3,000,000.00 - 1,000,000.00 12,500,000.00 NATIONAL GREENING PROGRAM 2,000,000.00 2,000,000.00 REPAIR OF SCHOOL BUILDING 2,000,000.00 2,000,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 SALINTUBIG PROJECT 1,000,000.00 1,000,000.00 HEALTH ENHANCEMENT FACILITY PROGRAM 500,000.00 500,000.00 TB CONTROL PROGRAM 1,000,000.00 1,000,000.00 REHABILITATION OF 2 DAY CARE CENTERS 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION - CONSTRUCTION OF FOOTBRIDGE 1,000,000.00 1,000,000.00 BARANGAY LINE ENHANCEMENT PROGRAM (BLEP) 3,000,000.00 3,000,000.00 1146 MOTIONG 1,000,000.00 - - - 6,500,000.00 - 2,200,000.00 - - 2,800,000.00 - - - - 12,500,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT (MOTORIZED FISHING BOAT AND FISH NETS) 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF RESILIENT MULTI-PURPOSE EVACUATION CENTER WITH COMPLETE FACILITIES 6,500,000.00 6,500,000.00 IMPROVEMENT OF HEALTH FACILITIES (RURAL HEALTH UNIT) 500,000.00 500,000.00 PROVISION OF BIRTHING CLINIC IN BHS MARARANGSI 1,200,000.00 1,200,000.00 ATTAINMENT OF MDGS A. MNCHN B. REPRODUCTIVE HEALTH C. MIDWIVES TOT D. CHT 500,000.00 500,000.00 LIVELIHOOD PROJECTS, PROVISION OF EQUIPMENT FOR PRODUCTION USING BAMBOO AND SCRAP CLOTH RAWMATERIALS 500,000.00 500,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER / WOMEN TRAINING CENTER 800,000.00 800,000.00 CONSTRUCTION OF OYANDIC DAY CARE CENTER 750,000.00 750,000.00 CONSTRUCTION OF CALAPI DAY CARE CENTER 750,000.00 750,000.00 1147 PAGSANGHAN 800,000.00 - - - 8,000,000.00 - 2,500,000.00 - - 1,200,000.00 - - - - 12,500,000.00 PRE AND POST HARVEST FACILITIES 800,000.00 800,000.00 CONSTRUCTION OF EVACUATION CENTER 5,000,000.00 5,000,000.00 CONSTRUCTION OF FLOOD CONTROL 1,500,000.00 1,500,000.00 CONSTRUCTION OF FLOOD CONTROL 1,500,000.00 1,500,000.00 UPGRADING / REPAIR OF BRGY. HEALTH STATION 1,000,000.00 1,000,000.00 CONSTRUCTION OF BRGY. HEALTH STATION 1,500,000.00 1,500,000.00 CONSTRUCTION OF DAY CARE CENTER 1,200,000.00 1,200,000.00 1148 PARANAS (WRIGHT) - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 IMPROVEMENT / CONCRETNG OFCONCEPCION - NAWI -PAGSANG- AN ROAD 12,500,000.00 12,500,000.00 1149 PINABACDAO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 WATER SYSTEM 12,500,000.00 12,500,000.00 1150 SAN JORGE 3,500,000.00 - - 1,000,000.00 4,150,000.00 - 1,000,000.00 - - 2,350,000.00 - - 500,000.00 - 12,500,000.00 CARABAO DISPERSAL ( 5 CARABAOS PER BARANGAY) 2,000,000.00 2,000,000.00 ORGANIC FERTILIZER PRODUCTION 600,000.00 600,000.00 RICE AND CORN PRODUCTION 900,000.00 900,000.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 PROVISION OF SCHOOL FURNITURES 700,000.00 700,000.00 VARIOUS DILG PROJECTS 3,650,000.00 3,650,000.00 CONSTRUCTION OF 2 UNITS EVACUATION CENTER - PORTS AND WHARF - CONSTRUCTION AND REPAIR OF RIVER LANDING - CSO CAPABILITY BUILDING 500,000.00 500,000.00 PURCHASE OF RESCUE EQUIPMENT - MNCHN PROGRAM 250,000.00 250,000.00 INFECTIUOS DISEASES CONTROL 250,000.00 250,000.00 HEALTH EMERGENCY MANAGEMENT 250,000.00 250,000.00 CHT PROGRAM 250,000.00 250,000.00 DAY CARE CENTER 2,350,000.00 2,350,000.00 TECHNICAL VOCATIONAL TRAINING 500,000.00 500,000.00 1151 SAN JOSE DE BUAN 3,965,000.00 - - 2,046,900.00 2,500,000.00 - 909,150.00 - - - - - 1,078,950.00 2,000,000.00 12,500,000.00 ANIMAL PRODUCTION FARM 1,400,000.00 1,400,000.00 PROVISION OF FARM IMPLEMENTS 595,000.00 595,000.00 ABACA PLANTATION ESTABLISHMENT AND MECHANIZATION OF FIBER EXTRACTION 1,970,000.00 1,970,000.00 REPAIR OF SCHOOL CLASS ROOMS AND PROVISION OF ARM CHAIRS 2,046,900.00 2,046,900.00 CONSTRUCTION OF DISASTER EVACUATION CENTER 2,500,000.00 2,500,000.00 PURCHASE OF HEALTH FACILITIES 909,150.00 909,150.00 CONCRETING OF MUNICIPAL LOCAL CORE ROAD PROJECT 2,000,000.00 2,000,000.00 TECHNICAL VOCATION TRAINING / COMMUNITY-BASED TRAINING 1,078,950.00 1,078,950.00 1152 SAN SEBASTIAN - - - - 3,000,000.00 - - - - - - - - 9,500,000.00 12,500,000.00 EVACUATION FACILITY (CONSTRUCTION OF EVACUATION CENTER) 3,000,000.00 3,000,000.00 CORE LOCAL ROAD CONSTRUCTION (ROAD CONCRETING) 9,500,000.00 9,500,000.00 1153 SANTA MARGARITA 8,200,000.00 - - - 3,000,000.00 - 1,300,000.00 - - - - - - - 12,500,000.00 FEED MILLS PRODUCTION 4,200,000.00 4,200,000.00 MANGROVE REFORESTATION 500,000.00 500,000.00 FISH PROCESSING 1,000,000.00 1,000,000.00 POLY-CULTURE OF MUDCRAB& MILKFISH (AQUA-CULTURE INDUSTRY) 2,500,000.00 2,500,000.00 EXPANSION OF WATER SUPPLY SYSTEM (LEVEL III) 3,000,000.00 3,000,000.00 HEALTH SERVICE DELIVERY ENHANCEMENT 1,300,000.00 1,300,000.00 1154 SANTA RITA 5,500,000.00 - - 2,000,000.00 - - 1,500,000.00 - - 3,500,000.00 - - - - 12,500,000.00 MARINE RESOURCE AND FISH SANCTUARY 1,000,000.00 1,000,000.00 TRADING POST 4,500,000.00 4,500,000.00 FABRICATION OF SCHOOL FURNITURES 2,000,000.00 2,000,000.00 BEMONC & CHT TRAINING 500,000.00 500,000.00 INFECTIOUS DISEASES PREVENTION AND CONTROL TRAINING 500,000.00 500,000.00 FACILITY ENHANCEMENT PROJECT 500,000.00 500,000.00 CRISIS CENTER FOR WOMEN AND CHILDREN 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 1155 SANTO NIO 1,200,000.00 - - - 3,500,000.00 - - - - 1,800,000.00 - - 1,000,000.00 5,000,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHING PRODUCTION AND DEVELOPMENT (PROVISION OF MOTORIZED BANCA AND FISH NETS) 700,000.00 700,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHING PRODUCTION AND DEVELOPMENT (TRACTORS AND TRESHERS) 500,000.00 500,000.00 VARIOS DILG PROJECTS 3,500,000.00 3,500,000.00 CONSTRUCTION OF FLOOD / RIVER CONTROL - CONSTRUCTION OF EVACUATION CENTER - PROVISION OF RESCUE EQUIPMENT - PROVISION OF LIVELIHOOD TRAININGS AND ASSISTANCE 1,300,000.00 1,300,000.00 REPAIR OF DAY CARE CENTER 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONCRETING OF CORE ROADS 5,000,000.00 5,000,000.00 EIM NCII 500,000.00 500,000.00 BPP (BREAD & PASTRY PRODUCTION) 500,000.00 500,000.00 1156 TAGAPUL-AN 1,100,000.00 - - 900,000.00 - 7,000,000.00 - - - - - - - 3,500,000.00 12,500,000.00 ESTABLISHMENT OF ANIMAL PRODUCTION FARM (GOAT, CATTLE) 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE TO QUALIIFIED FISHERFOLKS 600,000.00 600,000.00 REPAIR OF NIPA ELEMENTARY SCHOOL BUILDING 400,000.00 400,000.00 PROVISION OF ARMCHAIRS TO ALL ELEMENTARY AND SECONDARY SCHOOLS 500,000.00 500,000.00 ENERGIZATION OF 5 BARANGAYS 7,000,000.00 7,000,000.00 WIDENING AND CONCRETING OF CORE ROAD FROM POBLACION TO BRGY. LABANGBAYBAY 3,500,000.00 3,500,000.00 1157 TALALORA 5,600,000.00 - - - 1,620,000.00 - - - - - - - - 5,280,000.00 12,500,000.00 INFRA SUPPORT TO AGIRCULTURE AND FISHERY PRODUCTION AND DEVELOPMENT : MOTORIZED BANCA AND FISHING NETS 2,300,000.00 2,300,000.00 INFRA SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT:TRACTORS AND TRESHERS WITH ENGINE 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS: SMALL ROCK OYSTER CULTURED PRODUCTION 600,000.00 600,000.00 SUSTAINABLE AGRI -FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS: SEAWEED FARMING 2,200,000.00 2,200,000.00 REHABILITATION OF WATER SYSTEM 870,000.00 870,000.00 CAPABILITY BUILDING FOR CSOS 750,000.00 750,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION: LIVESTOCK, ROOT CROPS, FRUIT TREE, VEGETABLE, CEREALS, ETC. 5,280,000.00 5,280,000.00 1158 TARANGNAN 531,000.00 - - 1,620,000.00 1,599,000.00 - 2,250,000.00 - - - - - - 6,500,000.00 12,500,000.00 MARINE PROTECTED AREA AND FISH SANCTUARIES 531,000.00 531,000.00 BASIC EDUCATION FACILITIES: REPAIR / REHABILITATION OF CLASSROOM 1,620,000.00 1,620,000.00 RESCUE VEHICLE (LAND) 1,599,000.00 1,599,000.00 CONSTRUCTION OF SANITARY LATRINE 900,000.00 900,000.00 REHABILITATION OF BARANGAY HEALTH STATION (BHS) 1,350,000.00 1,350,000.00 VARIOUS ROAD PROJECTS 6,500,000.00 6,500,000.00 LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION - LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION - 1159 VILLAREAL 2,500,000.00 - - - 5,700,000.00 - 800,000.00 - - 1,500,000.00 - - - 2,000,000.00 12,500,000.00 FISH PORT 2,500,000.00 2,500,000.00 DRAINAGE & RETAINING WALL CONSTRUCTION 1,000,000.00 1,000,000.00 SEA WALL CONSTRUCTION 3,500,000.00 3,500,000.00 RESCUE VEHICLE 1,200,000.00 1,200,000.00 HALF-WAY HOUSE 800,000.00 800,000.00 DAY CARE CENTER 1,500,000.00 1,500,000.00 REHABILITATION OF ROAD 2,000,000.00 2,000,000.00 1160 ZUMARRAGA 500,000.00 - - 550,200.00 2,000,000.00 - 3,144,000.00 500,000.00 730,800.00 2,075,000.00 - - 500,000.00 2,500,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION 500,000.00 500,000.00 PROVISION OF SCHOOL FURNITURES 550,200.00 550,200.00 RESCUE EQUIPMENT 500,000.00 500,000.00 CONSTRUCTION OF FLOOD CONTROL 500,000.00 500,000.00 SALINTUBIG PROJECT 1,000,000.00 1,000,000.00 UPGRADING OF MAIN HEALTH CENTER WITH BIRTHING FACILITY CONSTRUCTED ACCORDING TO DOH GUIDELINES FOR LICENSING 1,000,000.00 1,000,000.00 CONSTRUCTION OF BRGY. HEALTH STATION WITH BIRTHING FACILITY 1,500,000.00 1,500,000.00 CHT MOBILIZATION 644,000.00 644,000.00 INTEGRATED LIVELIHOOD PROGRAMS * WORKERS INCOME AUGMENTATION PROGRAM 500,000.00 500,000.00 PRODUCT DEVELOPMENT (DIVE AND SNORKELING SITE) 730,800.00 730,800.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO -ENTERPRISE DEV'T TRACK 575,000.00 575,000.00 CONSTRUCTION OF DAYCARE CENTER 1,500,000.00 1,500,000.00 CORE LOCAL ROAD REPAIR AND REHAB 2,500,000.00 2,500,000.00 TECHNICAL VOCATIONAL TRAINING / COMMUNITY BASED TRAINING (ELECTRICAL INSTALLATION, MOTORCYCYLE / SMALL ENGINE SERVICING, PROCESSING FOOS BY SALTING, CURING, & SMOKING, PERFORM DIESEL / GAS ENGINE SERVICING) 500,000.00 500,000.00 SOUTHERN LEYTE 60,975,638.00 6,120,750.00 9,714,000.00 15,372,700.00 88,882,912.00 - 7,350,000.00 13,205,500.00 2,000,000.00 500,000.00 6,860,000.00 - 12,025,550.00 16,492,950.00 239,500,000.00 1161 ANAHAWAN 5,484,500.00 - - 500,000.00 3,500,000.00 - 1,100,000.00 1,915,500.00 - - - - - - 12,500,000.00 ORGANIC FEEDS FORMULATION WITH LIVESTOCK INTEGRATION 571,000.00 571,000.00 MASS PRODUCTION OF GABI AND BANANA 510,000.00 510,000.00 EXPANDED CORN PRODUCTION PROJECT 786,000.00 786,000.00 NATIVE CHICKEN PRODUCTION 500,500.00 500,500.00 UPSCALING ORGANIC FERTILIZER PRODUCTION 550,000.00 550,000.00 SUSTAINABLE FISHERY LIVELIHOOD DEVELOPMENT PROJECT THROUGH THE USE OF MOTORIZED FISHING BOAT AND FISHING GEARS 567,000.00 567,000.00 REHABILITATION OF 3 MPA GUARDHOUSES 1,000,000.00 1,000,000.00 ESTABLISHMENT OF MUNICIPAL NURSERY FOR FOOD PRODUCTION AND CLIMATE CHANGE MITIGATION 500,000.00 500,000.00 UPSCALING OF BARANGAY FOOD TERMINAL 500,000.00 500,000.00 REPAIR OF FIVE (5) CLASSROOMS (BAGONG LIPUNAN BUILDING) 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 1,750,000.00 1,750,000.00 EXPANSION OF LEVEL 3 WATER SYSTEM 1,750,000.00 1,750,000.00 HEALTH FACILITY B ENHANCEMENT PROGRAM/ PROCUREMENT OF ADDITIONAL EQUIPMENT 600,000.00 600,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 500,000.00 500,000.00 AMAKAN MAKING AND OTHER BAMBOO LINE PRODUCTS 515,500.00 515,500.00 DOLE-DLP-WIN AP/(CATERING SERVICES) 700,000.00 700,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TULOG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS/LIVELIHOOD PROGRAM FOR ANAHAWAN FISH VENDORS 700,000.00 700,000.00 1162 BONTOC 5,588,000.00 2,620,750.00 500,000.00 1,800,000.00 500,000.00 - - - - - - - 1,491,250.00 - 12,500,000.00 IRRIGATION PROJECT: SIP/STW 700,000.00 700,000.00 IRRIGATION PROJECT: REHABILITATION OF MUNDA 1,475,000.00 1,475,000.00 REHABILITATION OF LINE CANAL: GUINCASANVI/CASAMATA IRRIGATION SYSTEM 1,145,750.00 1,145,750.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION THROUGH THE USE OF HAND TRACTORS 800,000.00 800,000.00 INFRASTRUCTURE SUPPORT TO AGRI-FISHERY PRODUCTION AND DEVELOPMENT THROUGH THE USE OF MOTORIZED FISHING BOATS AND FISHNETS 700,000.00 700,000.00 ORGANIC FERTILIZER PRODUCTION 888,000.00 888,000.00 SUSTAINABLE AGRI-FISHERY AND OTHER AGRI-FISHERY BUSINESS INVESTMENT THROUGH HOG RAISING/FATTENING 1,000,000.00 1,000,000.00 SUSTAINABLE AGRI-BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS - AGRICULTURAL PRODUCTIVITY PROJECT (ROOTCROPS, VEGETABLES, COFFEE, PEANUTS, CACAO, BANANA) 1,000,000.00 1,000,000.00 SUSTAINABLE AGRI-BASED LIVELIHOOD & OTHER AGRI-FISHERY BUSINESS INVESTMENT THROUGH INSTALLATION OF FISH CAGE 500,000.00 500,000.00 NATIONAL GREENING PROGRAM (BAMBOO AND TREE PLANTATION ALONG RIVER BANKS 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: REPAIR OF 9 CLASSROOMS 1,300,000.00 1,300,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 500,000.00 500,000.00 CAPACITY BUILDING OF CSO'S 500,000.00 500,000.00 LIVELIHOOD TRAINING PROGRAM 1,491,250.00 1,491,250.00 1163 HINUNANGAN 1,800,000.00 - - 1,300,000.00 3,400,000.00 - - - - - - - 500,000.00 5,000,000.00 12,000,000.00 ACQUISITION OF AGRO-PROCESSING FACILITY FOR ORGANIC FEEDS PRODUCTION 800,000.00 800,000.00 ENHANCEMENT OF MARINE PROTECTED AREAS 1,000,000.00 1,000,000.00 REPAIR OF CLASSROOMS 1,300,000.00 1,300,000.00 RESCUE EQUIPMENT 500,000.00 500,000.00 CONSTRUCTION OF FLOOD CONTROL 2,900,000.00 2,900,000.00 REHABILITATION/CONCRETING OF ACCESS ROADS TO SERVICE FACILITIES 5,000,000.00 5,000,000.00 SKILLS TRAINING IN COOKERY NC II/EIM NC II/CHS NBC II/SMAWNC II 500,000.00 500,000.00 1164 HINUNDAYAN - 2,000,000.00 - - 3,000,000.00 - 500,000.00 800,000.00 - - - - 500,000.00 4,200,000.00 11,000,000.00 REHABILITATION OF IRRIGATION CATCHMENT BOX AND REPAIR OF LINE CANALS 2,000,000.00 2,000,000.00 CONSTRUCTION OF TRANSPORT TERMINAL 3,000,000.00 3,000,000.00 HEALTH FACILITIES ENHANCEMENT 500,000.00 500,000.00 ESTABLISHEMENT OF LIVELIHOOD FORMATION PROGRAM 800,000.00 800,000.00 CONCRETING OF ACCESS ROADS TO SERVICE FACILITIES 4,200,000.00 4,200,000.00 SKILLS TRAINING IN FOOD PROCESSING, WELDING, MASONRY AND CARPENTRY 500,000.00 500,000.00 1165 LIBAGON 1,500,000.00 - 1,000,000.00 850,700.00 8,149,300.00 - 500,000.00 - - - - - 500,000.00 - 12,500,000.00 MARINE RESERVE AND FISH SANCTUARIES 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (TRACTOR, PLANTER/ SEEDER, HARVESTER, THRESHER, SHELLER, MOTORIZED FISHING BOAT, FISH NETS) 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM: CACAO PLANTATION 1,000,000.00 1,000,000.00 REHABILITATION OF CLASSROOMS AND PROVISIONS OF SCHOOL FURNITURE 850,700.00 850,700.00 FLOOD CONTROL (CONSTRUCTION OF FLOOD CONTROL) 2,476,500.00 2,476,500.00 CONSTRUCTION OF SEAWALL 3,000,000.00 3,000,000.00 CONSTRUCTION OF EVACUATION CENTER 2,672,800.00 2,672,800.00 DENGUE CONTROL 15,300.00 15,300.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 104,800.00 104,800.00 RABIES ELIMINATION 219,000.00 219,000.00 STI/HIV AND AIDS PREVENTION 63,300.00 63,300.00 TB CONTROL 97,600.00 97,600.00 SKILLS TRAINING IN SMAWNCII 500,000.00 500,000.00 1166 LILOAN 4,500,000.00 - - 3,000,000.00 4,000,000.00 - - - - - 500,000.00 - 500,000.00 - 12,500,000.00 SUSTAINABLE AGRI-FISHERY PROJECT THROUGH PROVISION OF AGRI-FISHERY EQUIPMENT 2,000,000.00 2,000,000.00 ESTABLISHMENT OF SMALL SCALE IRRIGATIONPROJECT 1,500,000.00 1,500,000.00 UPGRADING OF TRADING POST 1,000,000.00 1,000,000.00 REHABILITATION OF ONE UNIT 4-CLASSROOM BUILDING (LILOAN NATIONAL TECHNICAL VOCATIONAL HS) 2,000,000.00 2,000,000.00 REHABILITATION OF ONE UNIT 2-CLASSROOM BUILDING ESTELA ELEMENTARY SCHOOL 500,000.00 500,000.00 REHABILITATION OF ONE UNIT SCHOOL BUILDING 500,000.00 500,000.00 CONSTRUCTION OF FLOOD CONTROL 3,500,000.00 3,500,000.00 REHABILITATION OF LEVEL III WATER SYSTEM 500,000.00 500,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 SKILLS DEVELOPMENT TRAINING: SKILLS TRAINING ON DRESSMAKING, FOOD 500,000.00 500,000.00 1167 LIMASAWA 3,000,000.00 - - - 7,500,000.00 - - 500,000.00 - - 1,000,000.00 - 500,000.00 - 12,500,000.00 ESTABLISHMENT OF MARINE RESERVE & FISH SANCTUARIES 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT (12 UNITS PUMPBOATS, 2 FADS, HOOK & LINE MATERIALS) 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD: ESTABLISHMENT OF MARICULTURE FARM (SEAWEEDS FARMING AND FISH CAGE) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INFRASTRUCTURE SUPPORT TO AGRICULTURE PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 EXPANSION OF LEVEL 3 WATER SYSTEM 7,500,000.00 7,500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) 500,000.00 500,000.00 YAMAN PINOY: INTEGRATED DRIED MARINE PRODUCTS PROCESSING AND DEVELOPMENT 500,000.00 500,000.00 YAMAN PINOY: HANDICRAFT PRODUCTION AND DEVELOPMENT TO SUPPORT TOURISM 500,000.00 500,000.00 PRODUCTION OF SKILLED LABORERS WITH START-UP TOOLS AND EQUIPMENT: TRAINING ON CARPENTRY AND MASONRY; SHIELDED METAL ARC WELDING 500,000.00 500,000.00 1168 MAASIN CITY 5,601,000.00 - 3,609,000.00 1,200,000.00 1,200,000.00 - - 2,890,000.00 - - 2,000,000.00 - - - 16,500,000.00 VARIOUS DA PROJECTS 3,161,000.00 3,161,000.00 AGRO PROCESSING FACILITIES-ROOT CROP PROCESSING ( ROOT CROP BASED) A). CASSAVA GRATE PROCESSING.B). DANSALAN CHIPS PROCESSING - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD- LIVESTOCK AND POULTRY - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD- VEGETABLES AND ROOTCROPS - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD- POLYCULTURE OF TILAPIA AND FRESHWATER PRAWN - AGRO-PROCESSING FACILITY - FEED MILLING OPERATION - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD- CORN PRODUCTION 1,000,000.00 1,000,000.00 ESTABLISHMENT OF MPA FOR FIVE (5) BARANGAYS IN MAASIN CITY 1,440,000.00 1,440,000.00 RUBBER & AGRO-FORESTRY PLANTATION 2,500,000.00 2,500,000.00 RATTAN & BAMBOO PLANTATION 570,000.00 570,000.00 NATIONAL GREENING PROJECT-CACAO PRODUCTION MAASIN CITY 539,000.00 539,000.00 BASIC EDUCATION FACILITIES: REHABILITATION OF THIRTY-ONE (31) CLASSROOMS 1,200,000.00 1,200,000.00 EXPANSION OF LEVEL III WATER SYSTEM (SALINTUBIG) 1,200,000.00 1,200,000.00 MOTORCYCLE MINI SHOP/WELDING SHOP 700,000.00 700,000.00 IMPROVEMENT OF VIRGIN COCONUT OIL PROCESSING FACILITY 1,190,000.00 1,190,000.00 LIVELIHOOD FOR IS WORKERS IN MAASIN CITY 1,000,000.00 1,000,000.00 SHARED SERVICE FACILITY ON INTEGRATED COCONUT GEO-NETS AND WHITE COPRA PROCESSING PLANT & FACILITIES 2,000,000.00 2,000,000.00 1169 MACROHON 4,070,000.00 - 500,000.00 - 3,795,700.00 - - 1,700,000.00 600,000.00 - 700,000.00 - 1,134,300.00 - 12,500,000.00 2.1 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS INVESTMENTS-VEGETABLE-OFF SEASON TECHNOLOGIES (CONSTRUCTION OF PROTECTED STRUCTURES & PURCHASE OF GRAFTED FRUIT TREES SEEDLINGS) 850,000.00 850,000.00 SUPPORT TO AGRI AND FISHERY PRODUCTION AND DEVELOPMENT (MINI 4-WHEEL DRIVE TRACTOR) 1,020,000.00 1,020,000.00 ORGANIC FERTILIZER PRODUCTION 1,700,000.00 1,700,000.00 MANGROVE REHABILITATION AND PROTECTION PROJECT 500,000.00 500,000.00 BAMBOO AND RATTAN PLANTATION 500,000.00 500,000.00 PROCUREMENT OF MARINE SEARCH AND RESCUE EQUIPMENT 1,445,700.00 1,445,700.00 PROCUREMENT OF MEDICAL FIRST RESPONDER VEHICLE 1,250,000.00 1,250,000.00 SALINTUBIG - UPGRADING OF LEVEL III WATER SUPPLY SYSTEM 1,100,000.00 1,100,000.00 FOOD PROCESSING CUM LIVELIHOOD 595,000.00 595,000.00 PURCHASE OF HIGH SPEED SEWING MACHINE (LIVELIHOOD AND SKILLS TRAINING PROGRAM FOR WOMEN WITH START UP CAPITAL AND EQUIPMENT) 510,000.00 510,000.00 MOTORCYCLE AND PEDICAB SPAREPARTS MERCHANDISE 595,000.00 595,000.00 MICRO & SMALL TOURISM BUSINESS (LOCAL TOURISM DEVELOPMENT PROJECT) 600,000.00 600,000.00 YAMAN PINOY - HANDICRAFT FASHION ACCESSORIES AND AMAKAN PRODUCTION (ENTREPRENEURIAL CAPABILITY BUILDING SKILLS UPGRADING AND PRODUCTIVE DEVELOPMENT) 700,000.00 700,000.00 SHIELDED METAL ARC WELDING NC II 570,000.00 570,000.00 COMPUTER HARDWARE SERVICES NC II 564,300.00 564,300.00 1170 MALITBOG 5,000,000.00 - 1,000,000.00 - 4,000,000.00 - - - - - 500,000.00 - 2,000,000.00 - 12,500,000.00 VARIOUS DA PROEJCTS 5,000,000.00 5,000,000.00 SUSTAINABLE FISHERY LIVELIHOOD DEVELOPMENT PROJECT THRU THE USE OF MOTORIZED FISHING BOATS AND FISHING GEARS - REHABILITATION OF IRRIGATION LINE CANALS: SAN ROQUE - SAN JOSE - ADOPTION OF FARM MECHANIZATION FOR AGRICULTURAL DEVELOPMENT PROJECT - TRADING POSTS: EXPANSION OF PUBLIC MARKET & INSTALLATION OF ADDITIONAL MARKET STALLS - RIVERBANKS REHABILITATION AND STABILIZATION 1,000,000.00 1,000,000.00 TILAPIA AQUA FARMING 1,500,000.00 1,500,000.00 SALIN-TUBIG: EXPANSION OF LEVEL III MALITBOG WATER SYSTEM 2,000,000.00 2,000,000.00 CAPABILITY BUILDING FOR CSOS: PROJECT MONITORING & EVALUATION 500,000.00 500,000.00 DEVELOPMENT OF THE PROCESSED FOOD INDUSTRY: A SUPPORT TO LOCAL LIVELIHOOD INITIATIVES 500,000.00 500,000.00 SKILLS TRAINING IN DRESSMAKING NC II 500,000.00 500,000.00 SKILLS TRAINING IN MOTORCYCLES/SMALL ENGINE SERVICING NC II 500,000.00 500,000.00 SKILLS TRAINING IN TAILORING NC II 500,000.00 500,000.00 SKILLS TRAINING IN ELECTRICAL INSTALLATION AND MAINTENANCE NC II 500,000.00 500,000.00 1171 PADRE BURGOS 3,000,000.00 - 600,000.00 500,000.00 6,900,000.00 - - - - - 500,000.00 - - 1,000,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE LIVELIHOOD PROGRAM (MICROENTERPRISE): VEGETABLE PRODUCTION 500,000.00 500,000.00 SUSTAINABLE AGRIFISHERY BASED LIVELIHOOD PROGRAM (TILAPIA CULTURE) 1,000,000.00 1,000,000.00 ADOPTION OF FARM MECHANIZATION FOR AGRICULTURAL DEVELOPMENT PROJECT 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 AGRI-FISHERY TRAINING ON AQUA-CULTURE 500,000.00 500,000.00 CACAO PRODUCTION 600,000.00 600,000.00 REPAIR OF CLASSROOMS 500,000.00 500,000.00 REHABILITATION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 PROCUREMENT OF RESCUE MOTOR BOAT 1,000,000.00 1,000,000.00 CONSTRUCTION OF FLOOD CONTROL 1,500,000.00 1,500,000.00 UPGRADING OF LEVEL III WATER SUPPLY SYSTEM 2,400,000.00 2,400,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (MICROENTERPRISE): MEAT PROCESSING 500,000.00 500,000.00 CORE LOCAL ROAD (ROAD CONCRETING) 1,000,000.00 1,000,000.00 1172 PINTUYAN 4,255,000.00 - - 1,082,000.00 3,163,000.00 - 500,000.00 500,000.00 - - - - - 3,000,000.00 12,500,000.00 GEOTEXTILE PRODUCTION 2,585,000.00 2,585,000.00 CACAO PRODUCTION 650,000.00 650,000.00 SUSTAINABLE FISHERY LIVELIHOOD DEVELOPMENT PROJECT THROUGH THE USE OF MOTORIZED FISHING BOATS & GEARS 520,000.00 520,000.00 ORGANIC VEGETABLE PRODUCTION AND INSTALLATION OF PROTECTIVE COVERING 500,000.00 500,000.00 REPAIR AND REHABILITATION OF SCHOOL BUILDINGS 1,082,000.00 1,082,000.00 FLOOD CONTROL 3,163,000.00 3,163,000.00 STI/HIV AIDS PREVENTION PROGRAM 500,000.00 500,000.00 LIVELIHOOD PROJECT FOR UNEMPLOYED & UNDER-EMPLOYED SECTOR 500,000.00 500,000.00 CONSTRUCTION OF PINTUYAN ECO PARK AND RESORT ACCESS ROAD 3,000,000.00 3,000,000.00 1173 SAINT BERNARD 2,097,050.00 - - 2,500,000.00 4,100,000.00 - - 500,000.00 - - 710,000.00 - - 2,592,950.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION DEVELOPMENT (TRACTOR, MUDBOAT & TURTLE) 945,000.00 945,000.00 SUSTAINABLE AGRI -FISHERY BASED LIVELIHOOD & OTHER AGRI- FISHERY BUSINESS INVESTMENTS (FISH CAGE) 500,000.00 500,000.00 REPAIR OF CANAL LINING 652,050.00 652,050.00 BASIC EDUCATION FACILITIES - REPAIR OF ELEMENTARY SCHOOL BUILDING 1,710,000.00 1,710,000.00 BASIC EDUCATION FACILITIES - PROVISION OF SCHOOL FURNITURES 500,000.00 500,000.00 GULAYAN SA PAARALAN 290,000.00 290,000.00 FLOOD CONTROL 2,000,000.00 2,000,000.00 EVACUATION FACILITY 2,100,000.00 2,100,000.00 CASAVA PROCESSING PROJECT 500,000.00 500,000.00 YAMAN PINOY 710,000.00 710,000.00 CORE LOCAL ROAD REHABILITATION 2,592,950.00 2,592,950.00 1174 SAN FRANCISCO 6,410,088.00 1,500,000.00 1,350,000.00 - 1,039,912.00 - - - - - - - 2,200,000.00 - 12,500,000.00 CASSAVA GRANULES PROCESSING 1,721,488.00 1,721,488.00 ADAPTION OF FARM MECHANIZATION FACILITIES AND EQUIPMENTS TO FARMERS ASSOCIATION 665,000.00 665,000.00 ADAPTION OF MOTORIZED FISHING BOATS, BANCAS, FISHING NETS, AND SQUID FISHING GEARS TO FISHERFOLKS ASSOCIATION 500,000.00 500,000.00 REHABILITATION OF IRRIGATION CATCHMENT BOX AND REPAIR OF LINE CANALS 1,500,000.00 1,500,000.00 COFFEE AND CACAO PLANTATION 1,000,000.00 1,000,000.00 PINEAPPLE PLANTATION 1,153,600.00 1,153,600.00 GULAYAN NG MGA KABABAIHAN SA KANAYUNAN 1,370,000.00 1,370,000.00 RUBBER TREE PLANTATION 1,350,000.00 1,350,000.00 SALINTUBIG: UPGRADING OF LEVEL III WATER SUPPLY SYSTEM 1,039,912.00 1,039,912.00 SKILLS TRAINING: SHIELDED METAL ARC WELDING (SMAW) NC II 2,200,000.00 2,200,000.00 1175 SAN JUAN - - - - 8,900,000.00 - - 3,600,000.00 - - - - - - 12,500,000.00 CONSTRUCTION OF EVACUATION CENTER 4,500,000.00 4,500,000.00 PROCUREMENT OF RESCUE EQUIPMENT 4,400,000.00 4,400,000.00 IMPLEMENTATION OF DOLE INTEGRATED LIVELIHOOD PROGRAMS (DILP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) 3,600,000.00 3,600,000.00 1176 SAN RICARDO 1,000,000.00 - - - 8,300,000.00 - 1,350,000.00 - - - 950,000.00 - 900,000.00 - 12,500,000.00 MUNICIPAL FOOD TERMINAL OPERATION ENHANCEMENT PROGRAM 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 FLOOD CONTROL SYSTEM 2,500,000.00 2,500,000.00 REHABILITATION OF LEVEL III WATER SYSTEM 5,800,000.00 5,800,000.00 HFEP (TB MICROSCOPY CENTER) 1,350,000.00 1,350,000.00 SHARED SERVICE FACILITY ON GEO NETS PRODUCTION 950,000.00 950,000.00 SCHOLARSHIP PROGRAM IN ELECTRONICS, COMPUTER HARDWARE SERVICING, WELDING, DRESSMAKING, ELECTRICAL INSTALLATION 900,000.00 900,000.00 1177 SILAGO 3,060,000.00 - 555,000.00 640,000.00 5,145,000.00 - 1,200,000.00 - 1,400,000.00 500,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,060,000.00 3,060,000.00 ESTABLISHMENT OF MARINE PROTECTED AREA (MPAS) - EXPANDED AGRI-BUSINESS ACTIVITIES FOR WOMEN IN AGRICULTURE - EXPANDED AGRI-BUSINESS ACTIVITIES: BANANA PLANTATION REHABILITATION AND VEGETABLE PRODUCTION - SUSTAINABLE FISHERY LIVELIHOOD DEVELOPMENT PROJECT THROUGH THE USE OF MOTORIZED FISHING BOAT - AGRI-FISHERY BASED LIVELIHOOD: HOG RAISING - PINEAPPLE PLANTATION - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS NATIVE CHICKEN PRODUCTION - ORGANIC VEGETABLE PRODUCTION AND ORGANIC FERTILIZER PRODUCTION - ALTERNATIVE AGRI-FISHERY LIVELIHOOD PROJECTS FOR SILAGO FISHERS AND FARMERS - NATIONAL GREENING PROGRAM 555,000.00 555,000.00 REHABILITATION OF 2 CLASSROOMS OF TUBAON ELEMENTARY SCHOOL 500,000.00 500,000.00 GULAYAN SA PAARALAN (ALL ELEMENTARY SCHOOLS) 140,000.00 140,000.00 PURCHASE OF RESCUE EQUIPMENT AND FACILITIES 500,000.00 500,000.00 CONSTRUCTION OF TWO-STOREY PUBLIC MARKET FOR DRY GOODS 2,995,000.00 2,995,000.00 SALINTUBIG - CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM 500,000.00 500,000.00 SALINTUBIG - CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM 500,000.00 500,000.00 CAPACITY BUILDING OF CSO'S IN SILAGO 650,000.00 650,000.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 700,000.00 700,000.00 ECOTOURISM: SOUTHERN LEYTE ECO-ADVENTURE PROGRAM (SEA TOURS) 600,000.00 600,000.00 HUMAN RESOURCE AND TOURISM PRODUCT DEVELOPMENT: HIGHLIGHTING THE ENHANCEMENT OF SPERM WHALE SKELETAL STRUCTURE 800,000.00 800,000.00 CASH TRAINING PROGRAM FOR 4PS BENEFICIARIES 500,000.00 500,000.00 1178 SOGOD 1,610,000.00 - 600,000.00 - 10,290,000.00 - - - - - - - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS 1,000,000.00 1,000,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 610,000.00 610,000.00 NATIONAL GREENING PROGRAM 600,000.00 600,000.00 CONSTRUCTION OF FLOOD CONTROL 6,200,000.00 6,200,000.00 COMPLETION OF EVACUATION CENTER 2,475,744.10 2,475,744.10 PURCHASE OF RESCUE EQUIPMENT 1,614,255.90 1,614,255.90 1179 TOMAS OPPUS 3,000,000.00 - - 2,000,000.00 2,000,000.00 - 2,200,000.00 800,000.00 - - - - 1,800,000.00 700,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 2,000,000.00 2,000,000.00 ESTABLISHMENT OF MULTI-PURPOSE DRYING PAVEMENT 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITIES: (REPAIR/REHABILITATION OF CLASSROOMS) 2,000,000.00 2,000,000.00 FLOOD CONTROL: CONSTRUCTION OF CANAL 1,000,000.00 1,000,000.00 PROCUREMENT OF RESCUE EQUIPMENT 1,000,000.00 1,000,000.00 HEALTH ENHANCEMENT PROGRAM TRAININGS & SEMINARS 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (CONSTRUCTION OF TB DOTS BUILDING) 700,000.00 700,000.00 RURAL HEALTH MIDWIVES PLACEMENT PROGRAM (2 MIDWIVES HIRING) 500,000.00 500,000.00 PROVISION OF SPECIAL PROGRAM FOR THE EMPLOYMENT OF STUDENTS (SPES) 800,000.00 800,000.00 LOCAL ROAD REHABILITATION 700,000.00 700,000.00 SKILLS TRAINING ON TESDA 1,000,000.00 1,000,000.00 LIVELIHOOD TRAINING PROGRAM 800,000.00 800,000.00 REGION IX 162,664,950.41 1,570,000.00 32,607,100.00 49,582,667.27 390,154,450.00 600,000.00 43,630,465.11 21,629,040.00 3,525,000.00 54,621,860.00 21,482,017.21 2,050,000.00 6,413,750.00 186,468,700.00 977,000,000.00 ZAMBOANGA DEL NORTE 85,519,950.41 - 15,327,500.00 16,425,167.27 154,922,000.00 - 22,595,765.11 12,117,600.00 1,525,000.00 23,530,000.00 10,882,017.21 - 1,500,000.00 37,655,000.00 382,000,000.00 1180 BACUNGAN (LEON T. POSTIGO) - - 1,005,000.00 1,360,000.00 4,980,000.00 - 680,000.00 1,500,000.00 - - - - - 2,975,000.00 12,500,000.00 ESTABLISHMENT/EXPANSION OF BARANGAY NURSERY 1,005,000.00 1,005,000.00 GULAYAN SA PAARALAN 510,000.00 510,000.00 REHABILITATION/REPAIR 1-UNIT 2 STOREY BUILDING 850,000.00 850,000.00 CONSTRUCTION OF 100MTS FOOTBRIDGE 1,640,000.00 1,640,000.00 EXPANSION OF WATER SYSTEM LEVEL II 3,340,000.00 3,340,000.00 GEOGRAPHICALLY ISOLATED & DISADVANTAGED AREA HEALTH SERVICE DELIVERY 680,000.00 680,000.00 LIVELIHOOD STARTER KITS FOR SURVIVAL AND SUBSISTENCE PANTAWID BENEFICIARIES (PRIORITIZING SET 1 BENEFICIARIES) 1,500,000.00 1,500,000.00 CONCRETING OF SECTIONAL FARM TO MARKET ROAD (FMR) 2,975,000.00 2,975,000.00 1181 BALIGUIAN 12,500,000.00 - - - - - - - - - - - - - 12,500,000.00 PROVISION OF 10-UNITS BABY RING NETS WITH FISHING GEARS 12,500,000.00 12,500,000.00 1182 DAPITAN CITY 7,250,000.00 - - - 3,750,000.00 - - - - - - - - 4,500,000.00 15,500,000.00 VARIOUS DA PROJECTS 7,250,000.00 7,250,000.00 ACQUISITION OF MOTORIZED BANCA WITH COMPLETE FISHING GEARS - MULTI-SPECIES HATCHERY - CACAO PRODUCTION: PROCUREMENT AND DISTRIBUTION OF CACAO SEEDLINGS - VARIOUS DILG PROJECTS 2,750,000.00 2,750,000.00 CONCRETING AND REHABILITATION OF TWO LANE 500 METERS - PROCUREMENT OF RESCUE EQUIPEMENT - CONSTRUCTION OF DRAINAGE CANAL FROM CITY HALL DRIVE - CONSTRUCTION ON THE WIDENING OF THE PORTION OF GUADING ADASA STREET - CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEMS 500,000.00 500,000.00 CONSTRUCTION/REHABILITATION WATER SYSYTEM 500,000.00 500,000.00 CONSTRUCTION OF CROSS-DRAINAGE AND EMBANKMENT OF BARANGAY ROAD 500,000.00 500,000.00 CONCRETING AND REHABILITATION OF 230 MTS. 2 LANE ROAD 1,000,000.00 1,000,000.00 CONCRETING AND REHABILITATION OF 1.40 KM. 1 LANE ROAD 3,000,000.00 3,000,000.00 1183 DIPOLOG CITY 5,650,000.00 - - 2,000,000.00 5,850,000.00 - 2,000,000.00 - - 2,000,000.00 3,000,000.00 - - - 20,500,000.00 VARIOUS DA PROJECTS 5,650,000.00 5,650,000.00 ESTABLISHMENT OF NURSERY CUT FLOWER,RUBBER AND CACAO - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS MARINE PROTECTED AREA - BALUT PRODUCTION - FARM IMPLEMENT AND POST HARVEST FACILITIES - PRODUCTION OF ORGANIC FERTILIZER - REHABILITATION OF SCHOOL CLASS 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 3,850,000.00 3,850,000.00 CLIMATE CHANGE ADAPTATION(CONSTRUCYION OF DRAINAGE CANAL) - CLIMATE CHANGE ADAPTATION(CONSTRUCTION OF RIVER CONTROL) - CLIMATE CHANGE ADAPTATION(CONSTRUCTION OF SEA WALL - CSO CAPACITY BUILDING 2,000,000.00 2,000,000.00 MOBILIZATION OF COMMUNITY HEALTH TEAMS 2,000,000.00 2,000,000.00 REHAB OF 50 DCC 2,000,000.00 2,000,000.00 LIVELIHOOD SKILLS TRAINING/RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 3,000,000.00 3,000,000.00 1184 GODOD 5,000,000.00 - - 2,000,000.00 5,500,000.00 - - - - - - - - - 12,500,000.00 POST HARVEST FACILITIES (MECHANICAL DRYER) 3,000,000.00 3,000,000.00 ORGANIC FERTILIZER PRODUCTION 2,000,000.00 2,000,000.00 REHABILITATION OF BASIC EDUCATIONAL FACILITIES 2,000,000.00 2,000,000.00 CONSTRUCTION OF FOOTBRIDGES 2,000,000.00 2,000,000.00 CONSTRUCTION OF 6-UNITS POTABLE WATER SUPPLY SYSTEM (LEVEL I & II) 3,500,000.00 3,500,000.00 1185 GUTALAC - - - - 13,500,000.00 - - - - - - - - - 13,500,000.00 CONSTRUCTION OF 1.500 KMS CONCRETE PAVEMENT 13,500,000.00 13,500,000.00 1186 JOSE DALMAN (PONOT) 5,000,000.00 - - - 5,500,000.00 - - 2,000,000.00 - - - - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (HOG RAISING PRODUCTION) 1,000,000.00 1,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (POULTRY PRODUCTION) 2,540,000.00 2,540,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (CREATION OF DRIED FISH FACILITIES) 1,460,000.00 1,460,000.00 SPRING DEVELOPMENT LEVEL II WATER SYSTEM 4,500,000.00 4,500,000.00 CSO CAPACITY BUILDING 1,000,000.00 1,000,000.00 HIGH VALUE CROPS PRODUCTION 500,000.00 500,000.00 DRESSMAKING AND TAILORING 1,000,000.00 1,000,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) - NITO HANDICRAFT PRODUCTION 500,000.00 500,000.00 1187 KALAWIT 3,100,000.00 - 2,000,000.00 - 2,500,000.00 - - 4,100,000.00 - 800,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,100,000.00 3,100,000.00 VERMI CAST FACILITY - LIVELIHOOD DEVELOPMENT PROJECT (PALM OIL PRODUCTION) - TRADING POST - WATERSHED REHABILITATION PROJECT 2,000,000.00 2,000,000.00 CONSTRUCTION OF WATER SYSTEM II 2,500,000.00 2,500,000.00 LIVELIHOOD ASSISTANCE PROJECT 1,600,000.00 1,600,000.00 LIVELIHOOD DEVELOPMENT PROJECT (RUBBER SEEDLING PRODUCTION) 2,500,000.00 2,500,000.00 CONSTRUCTION OF DCC 800,000.00 800,000.00 1188 KATIPUNAN - - - - 5,000,000.00 - - - - 1,200,000.00 - - 500,000.00 5,800,000.00 12,500,000.00 CONSTRUCTION OF 2.20 LN.M FLOOD CONTROL SOIL PREVENTION 500,000.00 500,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL I & II 2,000,000.00 2,000,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL I & II 2,000,000.00 2,000,000.00 CSO CAPACITY BUILDING 500,000.00 500,000.00 SLP MICRO ENTERPRISE DEVELOPMENT TRACK & EMPLOYMENT FACILITATION TRACK 1,200,000.00 1,200,000.00 CONSTRUCTION OF SECTIONAL ROAD CONCRETING 800,000.00 800,000.00 CONSTRUCTION OF SECTIONAL ROAD CONCRETING 500,000.00 500,000.00 CONSTRUCTION OF SECTIONAL ROAD CONCRETING 1,500,000.00 1,500,000.00 CONSTRUCTION OF SECTIONAL ROAD CONCRETING 1,500,000.00 1,500,000.00 CONSTRUCTION OF SECTIONAL ROAD CONCRETING 1,500,000.00 1,500,000.00 SKILLS TRAINING 500,000.00 500,000.00 1189 LA LIBERTAD - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF 25.0 LN.M SINGARAN-POBLACION SPILLWAY - CONSTRUCTION OF 85 LN.M SANTA TERESITA CRUZ-NEW BATAAN HANGING BRIDGE - CONSTRUCTION OF 80 LN.M NEWBATAAN-POBLACION HANGING BRIDGE - CONSTRUCTION OF WATER SYSTEM LEVEL III 880,000.00 880,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL III 742,500.00 742,500.00 IMPROVEMENT OF WATER SYSTEM LEVEL III 742,500.00 742,500.00 IMPROVEMENT OF WATER SYSTEM LEVEL III 742,500.00 742,500.00 IMPROVEMENT OF WATER SYSTEM LEVEL III 742,500.00 742,500.00 IMPROVEMENT OF WATER SYSTEM LEVEL III 1,850,000.00 1,850,000.00 IMPROVEMENT OF WATER SYSTEM LEVEL III 2,800,000.00 2,800,000.00 1190 LABASON 1,140,000.00 - 1,300,000.00 - 4,300,000.00 - - - - - - - - 5,760,000.00 12,500,000.00 MULTI-PURPOSE DRYING PAVEMENT (MPDP) 1,140,000.00 1,140,000.00 NURSERY/SEEDLING PRODUCTION 1,300,000.00 1,300,000.00 CONSTRUCTION OF DRAINAGE AT THE HEART OF POCLACION 3,800,000.00 3,800,000.00 CSO CAPACITY BUILDING 500,000.00 500,000.00 ROAD IMPROVEMENT FROM BRGY LOPOC - BRGY LAWAGAN TOURISM SITE 2,700,000.00 2,700,000.00 CONSTRUCTION/CONCRETING OF 300 LN.M X 6 MTS ROAD 3,060,000.00 3,060,000.00 1191 LILOY 8,500,000.00 - - 2,000,000.00 - - - - - - - - - 2,000,000.00 12,500,000.00 CONSTRUCTION OF FISH LANDING PORT WITH COLD STORAGE (PHASE 1) 7,000,000.00 7,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS AGRI-FISHERY DEVELOPMENT 500,000.00 500,000.00 ESTABLISHMENT OF COCONUT PROCESSING FACILITIES 1,000,000.00 1,000,000.00 REPAIR/REHAB OF PUNTA ES 500,000.00 500,000.00 REPAIR/REHAB OF TAPICAN ES 500,000.00 500,000.00 REPAIR/REHAB OF BAYBAY ES 500,000.00 500,000.00 REPAIR/REHAB OF KAYOK ES 500,000.00 500,000.00 CONCRETING OF ROAD LEADING TO BAYBAY CS 2,000,000.00 2,000,000.00 1192 MANUKAN 1,922,500.00 - 1,522,500.00 1,700,000.00 7,830,000.00 - - - 1,525,000.00 - - - - - 14,500,000.00 REHABILITATION OF FISH SANCTUARIES 500,000.00 500,000.00 COMMUNITY-BASED ORGANIC FACILITY 1,422,500.00 1,422,500.00 RUBBER PLANTATION 1,022,500.00 1,022,500.00 FRUIT TREES PLANTATION 500,000.00 500,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 REPAIR/REHABILITATION OF CLASSROOMS (6 CLASSROOMS) 800,000.00 800,000.00 REPAIR/REHABILITATION OF CLASSROOMS (6 CLASSROOMS) 800,000.00 800,000.00 VARIOUS DILG PROJECTS 6,775,000.00 6,775,000.00 CONSTRUCTION OF 800 MTS DRAINAGE CANAL WITH COVER - CONSTRUCTION OF 92 MTS RIVER CONTROL - CONSTRUCTION/IMPROVEMENT/EXPANSION OF WATER SUPPLY SYSTEM AT MULTI-PURPOSE CENTER RECEIVING AREA LEVEL III 555,000.00 555,000.00 REHABILITATION/EXPANSION OF WATER SUPPLY SYSTEM LEVEL III 500,000.00 500,000.00 LIBUTON CAVE SITE DEVELOPMENT 1,525,000.00 1,525,000.00 1193 MUTIA - - 500,000.00 - 7,500,000.00 - - 500,000.00 - - - - - 4,000,000.00 12,500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II 3,500,000.00 3,500,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II 3,500,000.00 3,500,000.00 CSO CAPACITY BUILDING 500,000.00 500,000.00 LIVELIHOOD PROGRAM: COCO VINEGAR & TOYO PROCESSING 500,000.00 500,000.00 CONCRETING OF 1 KM ROAD 1,000,000.00 1,000,000.00 CONCRETING OF 1 KM ROAD 3,000,000.00 3,000,000.00 1194 PIAN 500,000.00 - - 1,400,000.00 5,930,000.00 - 1,000,000.00 - - 1,300,000.00 - - - 2,370,000.00 12,500,000.00 ORGANIC FERTILIZER VERMI CAST PRODUCTION 500,000.00 500,000.00 REHABILITATION OF SCHOOL BUILDING 1,400,000.00 1,400,000.00 VARIOUS DILG PROJECTS 4,930,000.00 4,930,000.00 CONCRETING OF 270 MTS MUNICIPAL STREET - DON SANTA MARIANO MARCOS - CONCRETING OF 140 MTS MUNICIPAL STREET - JOSE SAGUIN STREET - CONCRETING OF 88 METERS A.BONIFACIO EXTENSION - CONSTRUCTION OF DRAINAGE CANAL - CONCRETING OF MUNICIPAL STREET - CAMIA STREET - CONSTRUCTION OF POTABLE WATER SUPPLY DEEP WELL - LEVEL I 500,000.00 500,000.00 CSO CAPACITY BUILDING 500,000.00 500,000.00 REHABILITATION OF MUNICIPAL HEALTH CENTER 1,000,000.00 1,000,000.00 SLP MICRO ENTERPRISE DEVELOPMENT TRACK & EMPLOYMENT FACILITATION TRACK 500,000.00 500,000.00 CONSTRUCTION OF DCC 800,000.00 800,000.00 CONCRETING OF 255 MTS MUNICIPAL STREET - ROAD NO. 3 (NAT'L HIGHWAY - PIAN HS 2,370,000.00 2,370,000.00 1195 POLANCO 2,060,000.00 - - 2,000,000.00 1,240,000.00 - 2,900,000.00 1,200,000.00 - 3,100,000.00 - - - - 12,500,000.00 POST HARVEST FACILITIES (MECHANICAL DRYER) 1,490,000.00 1,490,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE 570,000.00 570,000.00 REPAIR/REHAB OF TWO SECONDARY CLASSROOMS 500,000.00 500,000.00 REPAIR/REHAB OF SIX ELEMENTARY SCHOOL CLASSROOMS 1,500,000.00 1,500,000.00 FLOOD CONTROL PROJECT/PROGRAM 1,240,000.00 1,240,000.00 CONSTRUCTION OF BARANGAY HEALTH CENTER 800,000.00 800,000.00 EXPANSION OF BARANGAY HEALTH CENTER 600,000.00 600,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM(CONSTRUCTION OF HALFWAY HOUSE) 500,000.00 500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 500,000.00 500,000.00 PROVISION OF EQUIPMENT FOR HEALTH CENTERS AND NUTRITION POSTS 500,000.00 500,000.00 INTEGRATED LIVELIHOOD PROGRAM(SEWING SERVICES) 500,000.00 500,000.00 INTEGRATED LIVELIHOOD PROGRAM(PRINTING SERVICES) 700,000.00 700,000.00 SLP MICRO ENTERPRISE DEVELOPMENT TRACK & EMPLOYMENT FACILITATION TRACK 500,000.00 500,000.00 PROTECTIVE SERVICES-INFRA PROJECTS(CONSTRUCTION OF DAY CARE CENTER 1,600,000.00 1,600,000.00 PROTECTIVE SERVICES-INFRA PROJECTS(REPAIR AND UPGRADING OF DAY CARE CENTERS) 500,000.00 500,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING 500,000.00 500,000.00 1196 PRES. MANUEL A. ROXAS 3,500,000.00 - 1,300,000.00 200,000.00 7,500,000.00 - - - - - - - - 3,000,000.00 15,500,000.00 TRAMLINE 3,500,000.00 3,500,000.00 NATIONAL GREENING PROGRAM(RUBBER PLANTATION) 1,300,000.00 1,300,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 CONSTRUCTION OF DRAINAGE CANAL 2,000,000.00 2,000,000.00 CONSTRUCTION OF FLOOD/RIVER CONTROL 3,500,000.00 3,500,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II 2,000,000.00 2,000,000.00 CONCRETING OF LOCAL ROADS 2,000,000.00 2,000,000.00 CROSS-SECTIONAL ROAD CONCRETING 1,000,000.00 1,000,000.00 1197 RIZAL 5,188,000.00 - - 800,000.00 5,512,000.00 - - - - - - - 1,000,000.00 - 12,500,000.00 ORGANIC INPUT FACILITIES 600,000.00 600,000.00 MARINE PROTECTED AREA 500,000.00 500,000.00 CACAO PRODUCTION, CACAO NURSERY ESTABLISHMENT, TRAINING 3,518,000.00 3,518,000.00 PROVISION OF POST HARVEST FACILITIES (MPDP) 570,000.00 570,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 REPAIR OF SCHOOL BUILDINGS 600,000.00 600,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II 5,512,000.00 5,512,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VOCATIONAL TRAINING 1,000,000.00 1,000,000.00 1198 SALUG - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION AND INSTALLATION OF WATER WORKS SYSTEM 12,500,000.00 12,500,000.00 1199 SERGIO OSMEA SR. - - - - 6,500,000.00 - - - - - 1,500,000.00 - - 4,500,000.00 12,500,000.00 REHABILITATION OF WATER SYSTEM LEVEL III 6,500,000.00 6,500,000.00 OTOP STORE EXPRESS 900,000.00 900,000.00 ESTABLISMENT OF PANCIT NOODLE PROCESSING AND FACILITY(SSF) 600,000.00 600,000.00 CONSTRUCTION OF CORE LOCAL ROADS 4,500,000.00 4,500,000.00 1200 SIAYAN 8,150,000.00 - 1,000,000.00 350,000.00 3,000,000.00 - 1,500,000.00 - - 3,000,000.00 500,000.00 - - - 17,500,000.00 ANIMAL PRODUCTION 1,000,000.00 1,000,000.00 LIVELIHOOD TRAINING 500,000.00 500,000.00 SMALL AGRI-LIVELIHOOD ENTERPRISE (CORNON COB BUYING, SHELLING MILLING AND MARKETING) 2,000,000.00 2,000,000.00 ACQUISITION OF PRE AND POST HARVEST FACILITIES 2,000,000.00 2,000,000.00 NURSERY ESTABLISHMENT 500,000.00 500,000.00 CORN AND CASSAVA PRODUCTION 500,000.00 500,000.00 HIGH VALUE CROPS PRODUCTION 650,000.00 650,000.00 CASH CROPS PRODUCTION 500,000.00 500,000.00 RICE PRODUCTION 500,000.00 500,000.00 RUBBER BASED FARMING SYSTEM 1,000,000.00 1,000,000.00 GULAYAN SA PAARALAN 350,000.00 350,000.00 CONSTRUCTION/REHAB/EXPANSION OF POTABLE WATER SUPPLY LEVEL II,III 2,500,000.00 2,500,000.00 CSO CAPACITY BUILDING 500,000.00 500,000.00 PURCHASE OF HEALTH INSTRUMENTS 1,500,000.00 1,500,000.00 CONSTRUCTION OF DAYCARE CENTER 3,000,000.00 3,000,000.00 PANCIT MAKING EQUIPMENT 500,000.00 500,000.00 1201 SIBUCO 4,140,000.00 - - - 6,860,000.00 - - - - 2,050,000.00 450,000.00 - - - 13,500,000.00 ORGANIC FERTILIZER PRODUCTION 2,340,000.00 2,340,000.00 AGRI-FISHERIES TRAINING AND RESEARCH 900,000.00 900,000.00 PROCUREMENT OF FARM IMPLEMENTS (CASSAVA) 900,000.00 900,000.00 VARIOUS DILG PROJECTS 4,830,000.00 4,830,000.00 CONSTRUCTION OF RAM PUMP W/ SUPPLY MAIN AND RESERVOIR - CONSTRUCTION OF RAM PUMP W/ SUPPLY MAIN AND RESERVOIR - CONSTRUCTION OF RAM PUMP W/ SUPPLY MAIN AND RESERVOIR - CONSTRUCTION OF 2,000 LN.M DRAINAGE SYSTEM 2,030,000.00 2,030,000.00 CONSTRUCTION OF ALTERNATIVE LEARNING STUDY CENTER 450,000.00 450,000.00 CONSTRUCTION OF DCC 800,000.00 800,000.00 CONSTRUCTION OF DCC 800,000.00 800,000.00 TRAINING FOR THE PREPARATION OF DEVELOPMENT PLAN 450,000.00 450,000.00 1202 SIBUTAD - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 EVACUATION CENTER 12,500,000.00 12,500,000.00 1203 SINDANGAN 4,100,000.00 - 2,000,000.00 1,000,000.00 2,800,000.00 - 11,202,400.00 2,817,600.00 - 6,080,000.00 - - - - 30,000,000.00 RUBBER NURSERY AND PLANTATION 700,000.00 700,000.00 SUPPORT TO AGRICULTURE & FISHERY PRODUCTION 2,400,000.00 2,400,000.00 DRIED FISH PRODUCTION 1,000,000.00 1,000,000.00 REFORESTATION OF PUBLIC LANDS AND WATERSHED AREA 2,000,000.00 2,000,000.00 GULAYAN SA PAARALAN 1,000,000.00 1,000,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II 2,200,000.00 2,200,000.00 CSO CAPACITY BUILDING 600,000.00 600,000.00 BIRTHING CLINICS CONSTRUCTION 3,000,000.00 3,000,000.00 COMMUNAL TOILET CONSTRUCTION 7,500,000.00 7,500,000.00 TRAINING: CAPABILITY BUILDING 702,400.00 702,400.00 GARMENT PRODUCTION 1,217,600.00 1,217,600.00 POULTRY PRODUCTION 600,000.00 600,000.00 HOLLOWBLOCK MAKING 1,000,000.00 1,000,000.00 VARIOUS DSWD PROJECTS 6,080,000.00 6,080,000.00 CONSTRUCTION OF DCC - CONSTRUCTION OF DCC - REPAIR, MAINTENANCE & UPGRADING OF DCC - PROVISION OF ECCD LEARNING MATERIALS FOR DCCS AND SUPERVISE NEIGHBORHOOD PLAYGROUNDS (63 DCC & 17 SNP) - 1204 SIOCON 4,469,450.41 - - 615,167.27 2,670,000.00 - 3,313,365.11 - - - 5,432,017.21 - - - 16,500,000.00 ACQUISITION OF POST HARVEST FACILITY (RICE THRESHER) 500,000.00 500,000.00 CONSTRUCTION OF 1-UNIT MECHANICAL FLATBED DRYER 800,000.00 800,000.00 CONSTRUCTION OF TRADING POST (BAGSAKAN CENTER) 2,528,171.75 2,528,171.75 CONSTRUCTION OF MPDP 641,278.66 641,278.66 REPAIR/REHAB OF CLASSROOM SCHOOL BUILDING 615,167.27 615,167.27 VARIOUS DILG PROJECTS 2,670,000.00 2,670,000.00 CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF 821.50 LN.M DRAINAGE SYSTEM - CONSTRUCTION OF BARANGAY HEALTH STATION 769,303.40 769,303.40 CONSTRUCTION OF BARANGAY HEALTH STATION 769,303.40 769,303.40 CONSTRUCTION OF BARANGAY HEALTH STATION 769,303.40 769,303.40 CONSTRUCTION OF BIRTHING FACILITY 1,005,454.91 1,005,454.91 MICRO-ENTERPRISE DEVELOPMENT PROJECT 5,432,017.21 5,432,017.21 1205 SIRAWAI 3,350,000.00 - - - 6,750,000.00 - - - - 2,400,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 2,000,000.00 2,000,000.00 CONSTRUCTION OF SMALL IMPOUNDING PROJECTS - MECHANICAL DRYER (FBD) WITH RICE MILL AND FARM BODEGA - INFRA SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT 1,350,000.00 1,350,000.00 CONSTRUCTION OF FOOTBRIDGE 1,350,000.00 1,350,000.00 CONSTRUCTION OF 400 LN.M PORTLAND CEMENT CONCRETE PAVEMENT 2,700,000.00 2,700,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II 2,700,000.00 2,700,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROTECTIVE SERVICE CAPABILITY INFRASTRUCTURE PROJECT 2,400,000.00 2,400,000.00 1206 TAMPILISAN - - 4,700,000.00 1,000,000.00 2,450,000.00 - - - - 1,600,000.00 - - - 2,750,000.00 12,500,000.00 RUBBER DEVELOPMENT 4,700,000.00 4,700,000.00 REPAIR/REHAB OF 1 UNIT 3 CLASSROOM OF SCHOOL BUILDING 1,000,000.00 1,000,000.00 CONSTRUCTION OF DRAINAGE SYSTEM 1,750,000.00 1,750,000.00 CSO CAPACITY BUILDING 700,000.00 700,000.00 CONSTRUCTION OF DAYCARE CENTER 800,000.00 800,000.00 CONSTRUCRION OF DAY CARE CENTER 800,000.00 800,000.00 VARIOUS LGSF PROJECTS 2,750,000.00 2,750,000.00 CONCRETING OF 200 MTS YAKAL ROAD - CONCRETING OF 200 MTS RIZAL ROAD - ZAMBOANGA DEL SUR 55,296,000.00 1,570,000.00 12,819,600.00 25,010,000.00 150,726,200.00 600,000.00 15,889,000.00 5,900,000.00 1,000,000.00 15,000,000.00 10,100,000.00 650,000.00 - 85,939,200.00 380,500,000.00 1207 AURORA 6,300,000.00 - - - 1,000,000.00 - - - - 2,150,000.00 700,000.00 650,000.00 - 1,700,000.00 12,500,000.00 ACQUISITION OF MECHANICAL CORN SHELLER 500,000.00 500,000.00 ACQUISITION OF MOTORIZED FISHING BANCAS WITH FISH NETS 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 POULTRY RAISING PRODUCTION 500,000.00 500,000.00 CONSTRUCTION OF MUNICIPAL TRADING POST 2,700,000.00 2,700,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT (MPDP) 1,600,000.00 1,600,000.00 IMPROVEMENT OF LINTUGOP WATER SYSTEM 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PRGRAM (SLP):CUT FLOWERS, NIPA SHINGLES 500,000.00 500,000.00 CONSTRUCTION OF DAYCARE CENTER AT BRGY. KAUSWAGAN 800,000.00 800,000.00 CONSTRUCTION OF DAYCARE CENTER AT BRGY. KAUSWAGAN 850,000.00 850,000.00 TRAINING, MARKETING AND PRODUCT DEVELOPMENT OF PROCESSED SWEET KAONG 700,000.00 700,000.00 CONCRETING OF ANONANG BRGY ROAD 1,700,000.00 1,700,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 650,000.00 650,000.00 1208 BAYOG - - 1,000,000.00 - 11,500,000.00 - - - - - - - - - 12,500,000.00 WATERSHED REHABILITATION 500,000.00 500,000.00 AGRO-FORESTRY DEVELOPMENT 500,000.00 500,000.00 REHABILITATION AND IMPROVEMENT OF RIVER PROTECTION STRUCTURE 11,500,000.00 11,500,000.00 1209 DIMATALING 3,500,000.00 - - - 3,300,000.00 - - - - - - - - 5,700,000.00 12,500,000.00 VARIOUS DA PROJECTS 3,500,000.00 3,500,000.00 MULTI-PURPOSE DRYING PAVEMENT - VERMI CULTURE - MOTORIZED FISHING BOAT, FISH NET - CORN SHELLER, THRESHER - SMALL IMPOUNDING PROJECT (SIP) - CONSTRUCTION OF 100 MTS CONCRETE FOOT BRIDGE 500,000.00 500,000.00 CONSTRUCTION OF 100 MTS CONCRETE RIVER WALL 500,000.00 500,000.00 CONSTRUCTION OF 300 MTS SEA WALL 1,500,000.00 1,500,000.00 EXPANSION OF WATER SUPPLY SYSTEM LEVEL III 800,000.00 800,000.00 CONSTRUCTION OF 255 LN.M CONCRETE ROAD 5,700,000.00 5,700,000.00 1210 DINAS 4,200,000.00 - - - 3,500,000.00 - - - - 1,300,000.00 - - - 3,500,000.00 12,500,000.00 VARIOUS DA PROJECTS 4,200,000.00 4,200,000.00 ORGANIC FERTILIZER EQUIPMENTS - CONSTRUCTION OF BAGSAKAN CENTER - CONSTRUCTION OF CONCRETE MPA GUARD HOUSE - CONSTRUCTION OF WATER SYSTEM LEVEL II 500,000.00 500,000.00 REHABILITATION OF WATER SYSTEM LEVEL III 3,000,000.00 3,000,000.00 ESTABLISHMENT OF SHELTER FOR CINSP/ABUSED WOMEN 540,000.00 540,000.00 CONSTRUCTION OF DAY CARE CENTER 760,000.00 760,000.00 CONCRETING OF 350M ROADS (POBLACION & DON JOSE) 3,500,000.00 3,500,000.00 1211 DUMALINAO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 EXPANSION/UPGRADING/REHABILITATION OF WATER SYSTEM LEVEL III 12,500,000.00 12,500,000.00 1212 DUMINGAG 5,285,000.00 - - 6,120,000.00 - - 1,095,000.00 - - - - - - - 12,500,000.00 VARIOUS DA PROJECTS 4,385,000.00 4,385,000.00 FARM IMPLEMENTS/TOOLS - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERIES PRODUCTION AND DEVELOPMENT - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERIES PRODUCTION AND DEVELOPMENT - IRRIGATION PROJECT - SMALL IRRIGATION PROJECT (SIP) 900,000.00 900,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 3,600,000.00 3,600,000.00 GULAYAN SA PAARALAN 2,520,000.00 2,520,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM 1,095,000.00 1,095,000.00 1213 GUIPOS 890,000.00 570,000.00 - 2,340,000.00 1,000,000.00 - 1,000,000.00 - 1,000,000.00 - - - - 5,700,000.00 12,500,000.00 CONCRETING OF IRRIGATION LINE CANAL 570,000.00 570,000.00 ORGANIC FERTILIZER PRODUCTION 890,000.00 890,000.00 REPAIR/REHAB OF SCHOOL CLASSROOMS, SCHOOL OFFICE & SCHOOL FURNITURES 2,340,000.00 2,340,000.00 UPGRADING OF LEVEL III WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION/REHABILITATION OF BHS 1,000,000.00 1,000,000.00 COTTAGE AND RECEPTION AREA FOR GUIPOS CAVE 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONCRETING 5,700,000.00 5,700,000.00 1214 JOSEFINA 2,000,000.00 - - - 10,500,000.00 - - - - - - - - - 12,500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES: FEEDS PROCESSING AND PRODUCTION 500,000.00 500,000.00 CUTFLOWER PROJECT 1,000,000.00 1,000,000.00 CONSTRUCTION OF TRADING POST 500,000.00 500,000.00 VARIOUS DILG PROJECTS 5,500,000.00 5,500,000.00 CONCRETING OF 20CM X 6M X 220M WITH CONCRETE LINE CANAL - CONCRETING OF 15CM X 4M X 130M MUNICIPAL STREET - G. PADERES STREET - CONCRETE PAVEMENT WITH 15CM X 4M X 130M CONCRETE LINE CANAL/DRAINAGE - UPGRADING OF WATER SYSTEM LEVEL III 5,000,000.00 5,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 1215 KUMALARANG 3,200,000.00 - - - 9,300,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF 1-UNIT TRADING POST 2,000,000.00 2,000,000.00 CONSTRUCTION OF 1-UNIT TRADING POST 1,200,000.00 1,200,000.00 VARIOUS DILG PROJECTS 6,000,000.00 6,000,000.00 CONSTRUCTION OF 200 LN.M FLOOD CONTROL - CONSTRUCTION OF 300 LN.M FLOOD CONTROL - CONSTRUCTION OF 200 LN.M FLOOD CONTROL - CONSTRUCTION OF 80 LN.M FLOOD CONTROL - CONSTRUCTION OF 100 LN.M FLOOD CONTROL - CONSTRUCTION OF POTABLE WATER SYSTEM - PHASE I (LEVEL II) 2,700,000.00 2,700,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM - LEVEL II 600,000.00 600,000.00 1216 LABANGAN 1,500,000.00 1,000,000.00 500,000.00 1,000,000.00 3,100,000.00 600,000.00 1,400,000.00 - - 1,600,000.00 - - - 1,800,000.00 12,500,000.00 PROPOSED MARINE RESERVE AND FISH SANCTUARY 500,000.00 500,000.00 PROPOSED CONSTRUCTION OF TRADING CENTER 500,000.00 500,000.00 PROPOSED ALTERNATIVE LIVELIHOOD PROGRAM 500,000.00 500,000.00 PROPOSED REHABILITATION OF IRRIGATION CANAL 500,000.00 500,000.00 PROPOSED REHABILITATION OF IRRIGATION CANAL 500,000.00 500,000.00 PROPOSED MANGROVE REFORESTATION 500,000.00 500,000.00 REPAIR/REHAB OF CLASSROOM BUILDING 500,000.00 500,000.00 REPAIR/REHAB OF CLASSROOM BUILDING 500,000.00 500,000.00 VARIOUS DILG PROJECTS 3,100,000.00 3,100,000.00 CONSTRUCTION OF 100 MTS DRAINAGE SYSTEM - CONSTRUCTION OF LIVELIHOOD AND RESOURCE TRAINING CENTER - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF 500 MTS RIVER BANK CONTROL - RURAL ELECTRIFICATION (SOLAR-POWERED) 600,000.00 600,000.00 PROPOSED CONSTRUCTION OF HEALTH CENTER 700,000.00 700,000.00 PROPOSED CONSTRUCTION OF HEALTH CENTER 700,000.00 700,000.00 CONSTRUCTION OF DCC 800,000.00 800,000.00 CONSTRUCTION OF DCC 800,000.00 800,000.00 LOCAL ROAD 900,000.00 900,000.00 LOCAL ROAD 900,000.00 900,000.00 1217 LAKEWOOD - - - 2,700,000.00 6,900,000.00 - 500,000.00 500,000.00 - - - - - 1,900,000.00 12,500,000.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 BEF REPAIR/REHABILITATION OF CLASSROOM 2,400,000.00 2,400,000.00 FLOOD CONTROL PROJECTS AT MARIBABAO & SINUDJAPAN CREEK 2,500,000.00 2,500,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL I & II 4,400,000.00 4,400,000.00 BEMONC TRAINING 500,000.00 500,000.00 LIVELIHOOD PROGRAM ON NEGO CARTS AND VARIOUS/ASSORTED STARTER KIT 500,000.00 500,000.00 CONSTRUCTION OF 1.5 KMS CONCRETE ROAD OF JP LAUREL AND 1.0 KM GREGORIO DEL PILAR STREET 1,900,000.00 1,900,000.00 1218 LAPUYAN 2,140,000.00 - 919,600.00 1,500,000.00 5,940,400.00 - - - - - - - - 2,000,000.00 12,500,000.00 UPGRADING OF MINI WHARF 500,000.00 500,000.00 IMPROVEMENT OF TRADING POST/KABUHAYAN CENTER 500,000.00 500,000.00 CONSTRUCTION OF 5 UNITS CONCRETE PAVEMENT/DYER 1,140,000.00 1,140,000.00 MANGROVE REHABILITATION 919,600.00 919,600.00 REHABILITATION OF SCHOOL BUILDING (MACEDA) AVASMCES 500,000.00 500,000.00 REHABILITATION OF SCHOOL BUILDING 500,000.00 500,000.00 REHABILITATION OF SCHOOL BUILDING 500,000.00 500,000.00 VARIOUS DILG PROJECTS 1,760,400.00 1,760,400.00 RIVER CONTROL - IMPROVEMENT OF POBLACION DRAINAGE SYSTEM - VARIOUS WATER PROJECTS 4,180,000.00 4,180,000.00 REHABILITATION OF WATER SYSTEM LEVEL III - REHABILITATION OF WATER SYSTEM - REHABILITATION OF WATER SYSTEM - CORE LOCAL ROAD CONCRETING 2,000,000.00 2,000,000.00 1219 MAHAYAG 1,500,000.00 - - - - - - 500,000.00 - - - - - 10,500,000.00 12,500,000.00 ESTABLISHMENT OF VERMICULTURE CENTERS 1,000,000.00 1,000,000.00 VEGETABLE AND LIVESTOCK PRODUCTION 500,000.00 500,000.00 DRESSMAKING PROJECT 500,000.00 500,000.00 CONCRETING OF LOCAL ROADS 10,500,000.00 10,500,000.00 1220 MARGOSATUBIG - - - 600,000.00 7,500,000.00 - - - - 4,400,000.00 - - - - 12,500,000.00 REHABILITATION OF 1-UNIT SCHOOL BUILDING 600,000.00 600,000.00 CONSTRUCTION OF DRAINAGE, RIVER/FLOOD CONTROL 7,500,000.00 7,500,000.00 LIVELIHOOD FOR 4PS ORGANIZATION 3,700,000.00 3,700,000.00 LIVELIHOOD FOR DIFFERENTLY ABLED 700,000.00 700,000.00 1221 MIDSALIP - - 1,000,000.00 - - - - 1,000,000.00 - - - - - 10,500,000.00 12,500,000.00 FRUIT TREES PLANTATION 1,000,000.00 1,000,000.00 LIVELIHOOD/ENTERPRISE FORMATION 1,000,000.00 1,000,000.00 CONCRETING OF CRITICAL PORTIONS ROAD FROM CANIPAY SUR- MATALANG 10,500,000.00 10,500,000.00 1222 MOLAVE - - - - 7,500,800.00 - - - - - - - - 4,999,200.00 12,500,000.00 CONSTRUCTION OF 1.5 KMS FLOOD CONTROL BLISS AREA- MALOLOY-ON 7,500,800.00 7,500,800.00 CONSTRUCTION OF 1.3 KMS LOCAL CORE ROAD 4,999,200.00 4,999,200.00 1223 PAGADIAN CITY - - - - - - - - - - - - - 25,500,000.00 25,500,000.00 CONSTRUCTION OF SEA WALL AND CORE LOCAL ROAD (F.S. PAJARES) 25,500,000.00 25,500,000.00 1224 PITOGO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF 141 MTS SEA WALL - PHASE II 12,500,000.00 12,500,000.00 1225 RAMON MAGSAYSAY - - 600,000.00 - 2,500,000.00 - - 2,400,000.00 - - 7,000,000.00 - - - 12,500,000.00 ESTABLISHMENT OF PRODUCTION FOREST 600,000.00 600,000.00 VARIOUS DILG PROJECTS 2,500,000.00 2,500,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL III - CONSTRUCTION/COMPLETION OF RURAL WATER SYSTEM LEVEL III - IMPROVEMENT OF RURAL WATER SYSTEM LEVEL III - IMPROVEMENT OF RURAL WATER SYSTEM LEVEL III - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INTEGRATED LIVELIHOOD PROGRAM (PROVISION OF TRAINING, TOOLS AND EQUIPMENT) 2,400,000.00 2,400,000.00 PROVISION OF OIL REFINERY FACILITY 3,400,000.00 3,400,000.00 LEMON OIL PRODUCTION 600,000.00 600,000.00 ESTABLISHMENT OF INTEGRATED COCO PROCESSING FACILITY 3,000,000.00 3,000,000.00 1226 SAN MIGUEL - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 REHAB/EXPANSION/UPGRADING OF WATER SUPPLY SYSTEM W/ WATER TREATMENT FACILITIES 12,500,000.00 12,500,000.00 1227 SAN PABLO 4,170,000.00 - - 2,080,000.00 3,820,000.00 - - - - 1,050,000.00 - - - 1,380,000.00 12,500,000.00 BANANA PLANTATION (LAKATAN & CARDAVA) 500,000.00 500,000.00 PURCHASE OFHIGH VALUE FRUIT 500,000.00 500,000.00 LIVELIHOOD ON VEGETABLE FARMING 500,000.00 500,000.00 CONSTRUCTION OF FISH PORT 1,910,000.00 1,910,000.00 CONSTRUCTION OF TRADING POST 760,000.00 760,000.00 REHABILITATION OF 4 CL 1 UNIT SCHOOL BUILDING 840,000.00 840,000.00 REHABILITATION OF 3 CL 1 UNIT 740,000.00 740,000.00 REHABILITATION OF 2 CL 1 UNIT SCHOOL BUILDING 500,000.00 500,000.00 CONSTRUCTION OF SEA WALL PROTECTION (205 LINEAR METER SEA WALL 1,940,000.00 1,940,000.00 CONSTRUCTION OF SEA WALL PROTECTION 940,000.00 940,000.00 REHABILITATION OF LEVEL III WATER SYSTEM 940,000.00 940,000.00 CONSTRUCTION OF MULTI PURPOSE PAVEMENT (MPP) WITH CONCRETE BENCH 550,000.00 550,000.00 CONSTRUCTION OF MULTI PURPOSE PAVEMENT (MPP) WITH CONCRETE BENCH 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 1,380,000.00 1,380,000.00 CORE LOCAL ROAD CONCRETING - CORE LOCAL ROAD CONCRETING - 1228 SOMINOT (DON MARIANO MARCO) 1,606,000.00 - 5,000,000.00 1,500,000.00 - - 1,994,000.00 - - - 2,400,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,606,000.00 1,606,000.00 CONSTRUCTION OF TRADING POST - CONSTRUCTION OF MULTI PURPOSE DRYING PVAMENT - CONSTRUCTION OF ORGANIC FACILITY - WATERSHED REHABILITATION 3,000,000.00 3,000,000.00 AGRO-FORESTRY PROJECTS 1,000,000.00 1,000,000.00 RUBBER PLANTATION (SEEDLING AND BUDDED 1,000,000.00 1,000,000.00 CLASSROOM REPAIR 1,500,000.00 1,500,000.00 MATERNAL.NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 994,000.00 994,000.00 MUNICIPAL RABIES ELIMINATION 500,000.00 500,000.00 MUNICIPAL TB CONTROL PROJECTS 500,000.00 500,000.00 EQUIPMENT FOR PRODUCTION OF COCO WINE, VINEGAR, SUGAR AND NATA DE COCO 2,400,000.00 2,400,000.00 1229 TABINA 4,705,000.00 - - 1,670,000.00 6,125,000.00 - - - - - - - - - 12,500,000.00 ESTABLISHMENT OF TRADING POST 780,000.00 780,000.00 ORGANIC FERTILIZER PRODUCTION 2,400,000.00 2,400,000.00 ESTABLISHMENT OF COLD STORAGE FACILITIES 1,525,000.00 1,525,000.00 SCHOOL POCKET VEGETABLE GARDENING PROJECT 120,000.00 120,000.00 ABOT ALAM PROGRAM 500,000.00 500,000.00 REHABILITATION OF ACADEMIC CLASSROOMS 1,050,000.00 1,050,000.00 VARIOUS DILG PROJECTS 3,425,000.00 3,425,000.00 CONST OF 0.20M X 4.0M X 0.50 LINEAR KM PCCP W/ CROSS DRAINS & HEAD WALLS - CONSTRUCTIO OF FLOOD CONTROL - CONSTRUCTION OF WATER SYSTEM 900,000.00 900,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL III (PUMP DRIVEN) 1,000,000.00 1,000,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II (PUMP DRIVEN) 800,000.00 800,000.00 1230 TAMBULIG 1,500,000.00 - 2,500,000.00 3,240,000.00 1,000,000.00 - - - - 1,500,000.00 - - - 2,760,000.00 12,500,000.00 ANIMAL DISPERSAL LIVELIHOOD 1,500,000.00 1,500,000.00 GREENING PROGRAM 2,500,000.00 2,500,000.00 GULAYAN SA PAARALAN MAIN NATIONAL HIGH SCHOOL 500,000.00 500,000.00 GULAYAN SA PAARALAN FOR CENTRAL ELEMENTARY SCHOOL 140,000.00 140,000.00 FURNITURES AND FIXTURES (ELEMENTARY/SECONDARY) 500,000.00 500,000.00 CLASSROOM REHABILITATION FOR ELEMENTARY & SECONDARY 2,100,000.00 2,100,000.00 PROVISION OF FOOTBRIDGE 500,000.00 500,000.00 CONSTRUCTION OF DRAINAGE CANAL 500,000.00 500,000.00 PROVISION OF HYGIENE KIT TO SNP CENTERS 500,000.00 500,000.00 TRAINING TO DAY CARE WORKER AND PARENTS (SPES) 500,000.00 500,000.00 PROVISION OF LEARNING MATERIALS TO ECCD CENTERS 500,000.00 500,000.00 ACCESS ROAD FROM SWIMMING POOL TO NATIONAL HIGH WAY 2,760,000.00 2,760,000.00 1231 TIGBAO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION/IMPROVEMENT OF WATER SUPPLY SYSTEM LEVEL III 12,500,000.00 12,500,000.00 1232 TUKURAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM LEVEL III 12,500,000.00 12,500,000.00 1233 VICENZO A. SAGUN - - 600,000.00 1,660,000.00 2,240,000.00 - - - - - - - - 8,000,000.00 12,500,000.00 REFORESTATION PROJECT 600,000.00 600,000.00 PROVISION OF SCHOOL FURNITURE (ARMCHAIR) 500,000.00 500,000.00 GULAYAN SA PAARALAN 140,000.00 140,000.00 REHABILITATION OF SCHOOL BUILDING 1,020,000.00 1,020,000.00 VARIOUS DILG PROJECTS 1,240,000.00 1,240,000.00 CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF EVACUATION CENTER - PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 1,000,000.00 CONCRETING OF LOCAL ROADS (800 METERS) 8,000,000.00 8,000,000.00 1234 ZAMBOANGA CITY 12,800,000.00 - 700,000.00 600,000.00 1,500,000.00 - 9,900,000.00 1,500,000.00 - 3,000,000.00 - - - - 30,000,000.00 VARIOUS DA PROJECTS 8,000,000.00 8,000,000.00 ESTABLISHMENT OF VILLAGE TYPE ORGANIC PRODUCTION CENTER - ESTABLISHMENT OF VILLAGE TYPE ORGANIC PRODUCTION CENTER - GINGER PRODUCTION FOR BY-PRODUCT PROCESSING - GINGER PRODUCTION FOR BY-PRODUCT PROCESSING - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS GINGER PRODUCTION FOR BY-PRODUCT PROCESSING - GINGER PROCESSING TRAINING-CUM-PRODUCTION - CONSTRUCTION OF MINI PORTS/WHARVES - ACQUISITION OF 20 FOOTER BLAST FREEZER FOR CURUAN - ACQUISITION OF 20 FOOTER BLAST FREEZER FOR VITALI - ACQUISITION OF MOTORIZED FISHING BOATS 800,000.00 800,000.00 VARIOUS DA PROJECTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF SINGLE-PASS RICE MILL FACILITY - CONSTRUCTION OF DRYING FACILITIES - VARIOUS NIA PROJECTS 3,000,000.00 3,000,000.00 CONSTRUCTION OF SMALL IRRIGATION PROJECT - CONSTRUCTION OF SMALL IRRIGATION PROJECT - REFORESTATION AND REHABILITATION OF MANGROVE AND UPLAND AREAS 700,000.00 700,000.00 ALTERNATIVE LEARNING SCHOOL PROGRAM FOR CHILDREN AT RISK 600,000.00 600,000.00 EMPOWERMENT PROGRAMS FOR BASIC SECTOR 800,000.00 800,000.00 VARIOUS DILG PROJECTS 700,000.00 700,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM II - CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL II (FERROCEMENT) - COMMUNITY HEALTH TEAM MOBILIZATION 500,000.00 500,000.00 VARIOUS HEMS PROJECTS 1,500,000.00 1,500,000.00 HEALTH EMERGENCY MANAGEMENT SERVICES (HEMS) AMBULANCES 2,400,000.00 2,400,000.00 HEALTH EMERGENCY MANAGEMENT SERVICES (HEMS) SEA AMBULANCE 2,400,000.00 2,400,000.00 HEALTH EMERGENCY MANAGEMENT SERVICES (HEMS) UPGRADE 1,600,000.00 1,600,000.00 VARIOUS HHRDB PROJECTS 1,500,000.00 1,500,000.00 RN HEALS PROGRAM - RURAL HEALTH MIDWIFE PLACEMENT PROGRAM - VARIOUS DOLE PROJECTS 1,500,000.00 1,500,000.00 LIVELIHOOD PROGRAMS FOR DISPLACED WORKERS AND WORKERS IN THE INFORMAL SECTOR - CASH FOR WORK AND EMERGENCY EMPLOYMENT FOR DISPLACED WORKERS - PROGRAM FOR PWS'S (CAPACITY BUILDING & PHYSICAL / RESTORATION DEVICE) 1,200,000.00 1,200,000.00 VARIOUS DSWD PROJECTS 300,000.00 300,000.00 DAY CARE SERVICE TEACHING MATERIALS - DAY CARE OUTDOOR DEVICES - LIVELIHOOD PROGRAM FOR PERSONS WITH DISABILITIES 1,500,000.00 1,500,000.00 ZAMBOANGA SIBUGAY 19,029,000.00 - 3,960,000.00 6,876,000.00 81,861,250.00 - 3,860,000.00 2,540,000.00 1,000,000.00 13,615,500.00 500,000.00 1,400,000.00 4,913,750.00 61,444,500.00 201,000,000.00 1235 ALICIA 5,000,000.00 - - - - - - - - - - - - 7,500,000.00 12,500,000.00 CONSTRUCTION OF WHARF/PORT 2,400,000.00 2,400,000.00 CONSTRUCTION OF WHARF/PORT 2,000,000.00 2,000,000.00 FISHING BOAT WITH FISHNETS 600,000.00 600,000.00 CONCRETING OF 6" X 4.0M X 500M FARM TO MARKET ROAD (FMR) 2,500,000.00 2,500,000.00 CONCRETING OF 6" X 4.0M X 500M FARM TO MARKET ROAD (FMR) 5,000,000.00 5,000,000.00 1236 BUUG - - - - 8,400,000.00 - - - - 1,600,000.00 - - 2,500,000.00 - 12,500,000.00 IMPROVEMENT OF WATER SYSTEM 8,400,000.00 8,400,000.00 CONSTRUCTION OF DCC 1,600,000.00 1,600,000.00 SKILLS TRAINING: SHIELDED METAL ARC WELDING 500,000.00 500,000.00 SKILLS TRAINING: AUTOMOTIVE SERVICING W/ DRIVING 500,000.00 500,000.00 SKILLS TRAINING: BEAUTY CARE 500,000.00 500,000.00 SKILLS TRAINING: TRAINING ON FOOD PROCESSING 500,000.00 500,000.00 SKILLS TRAINING: COOKERY 250,000.00 250,000.00 SKILLS TRAINING: MASSAGE/SPA TRAINING 250,000.00 250,000.00 1237 DIPLAHAN - - 500,000.00 - 5,000,000.00 - - - 1,000,000.00 - - - 500,000.00 5,500,000.00 12,500,000.00 PLANTATION OF BAMBOO ALONG RIVER BANKS AND CREEKS AND RUBBER IN THE UPLAND AREAS 500,000.00 500,000.00 UPGRADING OF WATER SUPPLY SYSTEM 5,000,000.00 5,000,000.00 CONSTRUCTION OF FACILITIES/COTTAGES 1,000,000.00 1,000,000.00 VARIOUS LGSF PROJECTS 5,500,000.00 5,500,000.00 CONCRETING OF BONIFACIO STREET - CONCRETING OF ROAD FROM NATIONAL HIGHWAY TO UPPER BUTONG - SKILLS TRAINING 500,000.00 500,000.00 1238 IMELDA 600,000.00 - - 1,000,000.00 10,900,000.00 - - - - - - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION (ESTABLISHMENT OF VERMI COMPOST FACILITY) 600,000.00 600,000.00 REPAIR/REHABILITATION OF 1-UNIT 4-CL SCHOOL BUILDING 500,000.00 500,000.00 REPAIR/REHABILITATION OF 1-UNIT 2-CL SCHOOL BUILDING 500,000.00 500,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 10,900,000.00 10,900,000.00 1239 IPIL (CAPITAL) - - - - 5,100,000.00 - - - - - - - - 7,400,000.00 12,500,000.00 VARIOUS DILG PROJECTS 5,100,000.00 5,100,000.00 UPGRADING/CONCRETING OF 171 LN.M GENERAL VILLAMOR STREET (FRONTING SENIOR CITIZEN BLDG) - UPGRADING & CONCRETING OF 304 LN.M OF CLIMACO STREET-KAIMITO STREET - UPGRADING/CONCRETING OF 290 LN.M JUPITER STREET - CONCRETING OF 92 LN.M QUIRINO STREET - CONCRETING OF 147 LN.M MUNICIPAL ROAD ( PUROK TUBIGON) 1,300,000.00 1,300,000.00 CONCRETING OF 222 LN.M OF SIBUGAY NAT'L HIGH SCHOOL ACCESS ROAD (CAMPUS B) 1,800,000.00 1,800,000.00 UPGRADING & CONCRETING OF 350 LN.M CONCRETING; 400 LN.M GRAVELLING ROAD (NAT'L HIGHWAY-DON ANDRES ES) 4,300,000.00 4,300,000.00 1240 KABASALAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF CANALS/DRAINAGE 12,500,000.00 12,500,000.00 1241 MABUHAY 1,000,000.00 - 540,000.00 240,000.00 8,780,000.00 - 500,000.00 - - - 500,000.00 1,400,000.00 540,000.00 - 13,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENT OF ORGANIC FERTILIZER PRODUCTION (VERMI CULTURE) 500,000.00 500,000.00 CONSTRUCTION OF 2-UNITS MECHANICAL DRYERS 500,000.00 500,000.00 NATIONAL GREENING PROGRAM/MANGROVE REHABILITATION 540,000.00 540,000.00 GULAYAN SA PAARALAN 240,000.00 240,000.00 VARIOUS DILG PROJECTS 8,780,000.00 8,780,000.00 EVACUATION FACILITY (STANDARD) - CONSTRUCTION OF CONCRETE DRAINAGE CANAL OF MUNICIPAL STREETS - RABIES ELIMINATION 500,000.00 500,000.00 SHARED SERVICE FACILITY 500,000.00 500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 650,000.00 650,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 750,000.00 750,000.00 TECHNICAL VOCATIONAL TRAINING/COMMUNITY BASED TRAINING 540,000.00 540,000.00 1242 MALANGAS 1,200,000.00 - - 900,000.00 900,000.00 - 750,000.00 - - 1,500,000.00 - - - 7,250,000.00 12,500,000.00 PROCUREMENT OF 1 THRESHER, 2 TRACTORS, 1 SHELLER, 1 MUDBOAT 500,000.00 500,000.00 FISHERY PRODUCTION AND DEVELOPMENT 700,000.00 700,000.00 REHABILITATION OF 2-UNITS 3 CL SCHOOL BUILDING 900,000.00 900,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II 900,000.00 900,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 750,000.00 750,000.00 CONSTRUCTION OF DCC 750,000.00 750,000.00 CONSTRUCTION OF DCC 750,000.00 750,000.00 VARIOUS LGSF PROJECTS 3,040,000.00 3,040,000.00 CONCRETING OF 260 LN.M CORE OCAL ROAD - CONCRETING OF 260 LN.M CORE OCAL ROAD - CONCRETING OF 260 LN.M CORE OCAL ROAD - CONCRETING OF 260 LN.M CORE OCAL ROAD - CONCRETING OF 260 LN.M CORE OCAL ROAD 1,385,000.00 1,385,000.00 CONCRETING OF 265 LN.M CORE LOCAL ROAD 1,440,000.00 1,440,000.00 CONCRETING OF 260 LN.M CORE OCAL ROAD 1,385,000.00 1,385,000.00 1243 NAGA - - - 300,000.00 8,700,000.00 - - - - 3,500,000.00 - - - - 12,500,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 VARIOUS DILG PROJECTS 8,700,000.00 8,700,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II - CONSTRUCTION OF WATER SYSTEM LEVEL II - CONSTRUCTION OF WATER SYSTEM LEVEL II - CONSTRUCTION OF WATER SYSTEM LEVEL II - CONSTRUCTION OF WATER SYSTEM LEVEL II - CONSTRUCTION OF WATER SYSTEM LEVEL II - CONSTRUCTION OF WATER SYSTEM LEVEL II - CONSTRUCTION OF WATER SYSTEM LEVEL II - CONSTRUCTION OF WATER SYSTEM LEVEL II - SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 1244 OLUTANGA - - - - 3,600,000.00 - - - - 2,400,000.00 - - - 6,500,000.00 12,500,000.00 CONSTRUCTION OF 1.20M X 100 M CONCRETE FOOTBRIDGE 2,500,000.00 2,500,000.00 CONCRETING OF BOY DASIANA STREET (255.0M CONCRETED, CARRIAGEWAY 5.0M WITH 1.0M SHOULDERING) 1,100,000.00 1,100,000.00 SLP - MICROENTERPRISE DEVELOPMENT TRACK 2,400,000.00 2,400,000.00 CONCRETE OF SOLAR-TAMBANAN ROAD PHASE II 6,500,000.00 6,500,000.00 1245 PAYAO - - - - 1,500,000.00 - - - - - - - - 11,000,000.00 12,500,000.00 CONSTRUCTION OF BOX CULVERT 555,000.00 555,000.00 CONSTRUCTION OF THREE (3) UNITS DEEP WELL-SALINTUBIG PROGRAM 945,000.00 945,000.00 CONSTRUCTION OF ROAD CONCRETING 6,600,000.00 6,600,000.00 CONCRETING OF ROAD PORTION OF LA FORTUNA-CALAPE 4,400,000.00 4,400,000.00 1246 ROSELLER LIM 504,000.00 - 900,000.00 2,016,000.00 4,850,000.00 - 630,000.00 540,000.00 - 3,060,000.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION - VERMICULTURE KALALI WOMEN'S 504,000.00 504,000.00 ESTABLISHMENT OF FRUIT TREES, ABACA AND BAMBOO MUNICIPAL NURSERY 900,000.00 900,000.00 REHAB/REPAIR OF 3 CL SCHOOL BUILDING 810,000.00 810,000.00 REHAB/REPAIR OF 4 CL SCHOOL BUILDING 1,080,000.00 1,080,000.00 GULAYAN SA PAARALAN 126,000.00 126,000.00 VARIOUS DILG PROJECTS 4,850,000.00 4,850,000.00 CONCRETING OF 300 MTS BANKAL STREET - CONCRETING OF 1.0 KM ALI ALSREE STREET - MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) TRAINING PROGRAM; HEALTH EMERGENCY MANAGEMENT; RURAL HEALTH MIDWIFE PLACEMENT PROGRAM; TB CONTROL TRAINING; ENAHNCEMENT TRAINING & ORIENTATION FOR BNS AND BNC 630,000.00 630,000.00 INTEGRATED LIVELIHOOD PROGRAMS FOR OVERSEAS FILIPINO WORKERS (OFWS) AND THE INFORMAL SECTOR 540,000.00 540,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICRO-ENTERPRISE DEVELOPMENT TRACK 504,000.00 504,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: EMPLOYMENT FACILITATION TRACK 504,000.00 504,000.00 CONSTRUCTION OF DCC 1,368,000.00 1,368,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER WITH DESIGNATED ROOMS FOR EACH CASES OF WOMEN AND GIRL-CHILDREN ABUSES 684,000.00 684,000.00 1247 SIAY 2,600,000.00 - 520,000.00 1,500,000.00 2,000,000.00 - - 1,000,000.00 - - - - - 4,880,000.00 12,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PROCUREMENT OF 2-UNITS MECHANICAL DRYER 2,600,000.00 2,600,000.00 ESTABLISHMENT OF 20 HECTARES RUBBER BASED PLANTATION 520,000.00 520,000.00 REHAB OF 3-UNITS SCHOOL BUILDING 1,500,000.00 1,500,000.00 CONSTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 CONCRETING OF 2.0 KM ONE (1) LANE ROAD 4,880,000.00 4,880,000.00 1248 TALUSAN 4,000,000.00 - - - 2,300,000.00 - - - - - - - 800,000.00 5,400,000.00 12,500,000.00 CONSTRUCTION OF WHARF AT SITIO DAO 1,000,000.00 1,000,000.00 CONSTRUCTION OF WHARF AT SITIO PUTTING BATO 3,000,000.00 3,000,000.00 CONST OF POBLACION WATER SYSTEM (LEVEL II) - ADD'L 1-UNIT CONCRETE RESERVOIR 1,300,000.00 1,300,000.00 EXPANSION OF SAMONTE WATER SYSTEM LEVEL II 1,000,000.00 1,000,000.00 CONCRETING OF 1.0 KM LAPARAY-SAGAY CORE LOCAL ROAD 5,400,000.00 5,400,000.00 TRAINING AND ASSESSMENT 800,000.00 800,000.00 1249 TITAY 2,000,000.00 - 1,500,000.00 420,000.00 5,206,250.00 - 800,000.00 500,000.00 - - - - 573,750.00 1,500,000.00 12,500,000.00 VARIOUS DA PROJECTS 2,000,000.00 2,000,000.00 COPRA TRADING - VERMI CAST PRODUCTION - VERMI CAST PRODUCTION - VERMI CAST PRODUCTION - VERMI CAST PRODUCTION - VERMI CAST PRODUCTION - VERMI CAST PRODUCTION - ACQUISITION OF FARM MECHANIZATION FACILITIES AND EQUIPMENT - ACQUISITION OF FARM MECHANIZATION FACILITIES AND EQUIPMENT - NATIONAL GREENING PROGRAM 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN 420,000.00 420,000.00 CAPACITY BUILDING 500,000.00 500,000.00 CAPACITY BUILDING 500,000.00 500,000.00 CONSTRUCTION OF CARLOS P. GARCIA 3,000,000.00 3,000,000.00 CONSTRUCTION OF MUNICIPAL DRAINAGE SYSTEM 1,206,250.00 1,206,250.00 CONSTRUCTION OF HEALTH BIRTHING STATION 800,000.00 800,000.00 LIVELIHOOD PROJECTS (BANANA CHIPS) 500,000.00 500,000.00 REHAB OF SAN ANTONIO MUNICIPAL ROAD 1,500,000.00 1,500,000.00 MAN POWER SKILLS DEVELOPMENT PROGRAM 573,750.00 573,750.00 1250 TUNGAWAN 2,125,000.00 - - 500,000.00 2,125,000.00 - 1,180,000.00 500,000.00 - 1,555,500.00 - - - 4,514,500.00 12,500,000.00 PURCHASE OF 1-UNIT FARM TRACTOR 850,000.00 850,000.00 ORGANIC FERTILIZER PRODUCTION 1,275,000.00 1,275,000.00 REHAB OF 3-UNITS BLDG 500,000.00 500,000.00 CONSTRUCTION OF 500M CONCRETE DRAINAGE CANAL 850,000.00 850,000.00 CONSTRUCTION OF WATERWORKS SYSTEM LEVEL II 1,275,000.00 1,275,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM (PURCHASE OF MEDICAL EQUIPMENT) 500,000.00 500,000.00 REHAB OF BHS AND EQUIPMENT COMPLEMENTATION 680,000.00 680,000.00 INTEGRATED LIVELIHOOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF DCC 850,000.00 850,000.00 LEARNING MATERIALS FOR DCC (35 DCCS) 705,500.00 705,500.00 REHAB/CONCRETING OF STO. NINO NIO-VICENTE ROAD (500M CONCRETING; 4KM ROAD REHAB) 4,514,500.00 4,514,500.00 CITY OF ISABELA (CAPITAL) 2,820,000.00 - 500,000.00 1,271,500.00 2,645,000.00 - 1,285,700.00 1,071,440.00 - 2,476,360.00 - - - 1,430,000.00 13,500,000.00 1251 CITY OF ISABELA (CAPITAL) 2,820,000.00 - 500,000.00 1,271,500.00 2,645,000.00 - 1,285,700.00 1,071,440.00 - 2,476,360.00 - - - 1,430,000.00 13,500,000.00 FISH NET 520,000.00 520,000.00 FISHING BOAT (A. MOTORIZED; B. NON-MOTORIZED) 1,200,000.00 1,200,000.00 MEAT AND FISH PROCESSING FACILITIES/EQUIPMENT 600,000.00 600,000.00 PROCUREMENT OF GARDEN TOOLS 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 REPAIR/REHAB OF SCHOOL BUILDING 1,071,500.00 1,071,500.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 RESCUE AND RUBBER BOAT WITH EQUIPMENTS 1,000,000.00 1,000,000.00 CONSTRUCTION OF WATER SUPPLY SYSTEM LEVEL II 1,645,000.00 1,645,000.00 CONSTRUCTION OF BALANTANAY BARANGAY HEALTH STATION 1,285,700.00 1,285,700.00 ENTERPRISE DEVELOPMENT THRU ESTABLISHMENT OF A LIVELIHOOD PROJECT ON MIKI PROCESSING, BAKING/PASTRIES, PEANUT BRITTLE, MOBILE STORE/STATION 571,440.00 571,440.00 EMERGENCY EMPLOYMENT/ SHORT TERM EMPLOYMENT FOR WORKERS OF LARBENCO 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - CAPACITY BUILDING 1,542,914.29 1,542,914.29 VARIOUS KC PROJECTS 933,445.71 933,445.71 CONSTRUCTION OF DCC - CONSTRUCTION OF WOMEN CRISIS CENTER - CONCRETING OF 250 MTS RAVEMENT ROAD 1,430,000.00 1,430,000.00 REGION X 219,402,365.50 4,200,000.00 9,627,500.00 49,055,200.00 391,320,994.75 - 29,715,400.00 52,363,000.00 14,250,000.00 136,776,500.00 24,563,251.00 500,000.00 13,411,200.00 387,921,700.00 1,333,107,111.25 BUKIDNON 68,536,000.00 1,200,000.00 7,100,000.00 18,224,000.00 92,915,500.00 - 10,706,600.00 28,200,000.00 3,000,000.00 37,664,500.00 11,095,000.00 500,000.00 3,175,000.00 72,183,400.00 354,500,000.00 1252 BAUNGON 5,350,000.00 - - - 1,000,000.00 - 1,100,000.00 1,000,000.00 - 500,000.00 - - 500,000.00 3,050,000.00 12,500,000.00 VARIOUS DA PROJECTS 5,350,000.00 5,350,000.00 PROVISION OF FLAT BED DRYER - PROVISION OF RICE MILLING EQUIPMENT - BACKYARD SWINE PRODUCTION - LIVESTOCK/CATTLE DISPERSAL - LIVESTOCK/CATTLE DISPERSAL - LIVESTOCK/CATTLE DISPERSAL - PROVISION OF DRAFT ANIMALS - RUBBER PRODUCTION - SPRING DEVELOPMENTLEVEL 1 500,000.00 500,000.00 CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 PROCUREMENT OF OPB/PCB, MCP & TB DOTS EQUIPMENT / INSTRUMENTS 1,100,000.00 1,100,000.00 ILP FOR SMALL STORE OWNERS 1,000,000.00 1,000,000.00 ESTABLISHMENT OF OFFICE OF PERSON W/ DISABILITY AFFAIRS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONCRETING OF BARANGAY ACCESS ROAD 3,050,000.00 3,050,000.00 SKILLS TRAINING 500,000.00 500,000.00 1253 CABANGLASAN 1,550,000.00 - - 730,000.00 2,500,000.00 - 1,500,000.00 - - 1,520,000.00 1,200,000.00 500,000.00 - 3,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,550,000.00 1,550,000.00 CONSTRUCTION OF BODEGA W/ SOLAR DRYER & PURCHASE OF CASSAVA CHIPPER - GOATERY- CATERING TYPE (FOR SENIOR CITIZENS AGING 60-70 YEARS OLD - ORGANIC FERTILIZER PRODUCTION FACILITIES - REPAIR/REHAB. OF 7 UNITS SCHOOL BUILDING 700,000.00 700,000.00 GULAYAN SA PAARALAN 30,000.00 30,000.00 CONSTRUCTION OF 1 UNIT LEVEL II WATER SYSTEM 2,500,000.00 2,500,000.00 REHAB./REPAIR OF 3 UNITS BHS 1,500,000.00 1,500,000.00 VARIOUS DSWD PROJECTS 1,520,000.00 1,520,000.00 REPAIR & UPGRADING OF 4 UNITS DCCS - PLAYING DEVICES & FACILITIES FOR DCCS: MONKEY BAR, SEESAW, SWING, SLIDE (7 UNITS @ P100,000/UNIT) - PROVISION OF DEVICES FOR PWD - YAMAN PINOY- PRODUCT DEVELOPMENT, TRAININGS & MARKETING TO SUPPORT SQUASH PROCESSING PROJECT (OTOP) & MEAT PROCESSING (NOT REVIEWED) 700,000.00 700,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM- BUSINESS DEVELOPMENT & MARKETING SUPPORT (CONTINUING PROGRAM FOR DRESS MAKING, TAILORING & HAIR SCIENCE) 500,000.00 500,000.00 CONSTRUCTION OF BARANGAY ROAD 2,000,000.00 2,000,000.00 REHAB. OF BARANGAY ROADS 1,000,000.00 1,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 500,000.00 500,000.00 1254 CITY OF MALAYBALAY (CAPITAL) 4,795,500.00 - 3,450,000.00 5,000,000.00 740,500.00 - 4,414,000.00 6,500,000.00 - 1,600,000.00 500,000.00 - 1,500,000.00 1,500,000.00 30,000,000.00 VARIOUS DA PROJECTS 3,695,500.00 3,695,500.00 INFRA SUPPORT TO AGRICULTURE (PROVISION OF CORN SHELLER) - TRADING POST - SUSTAINABLE AGRI LIVELIHOOD PROJECT - ORGANIC FERTILIZER PRODUCTION - FARM IMPLEMENTS & TOOLS - AGRI-FISHERY TRAINING 500,000.00 500,000.00 SUSTAINABLE FISHERY BASED LIVELIHOOD PROJECT 600,000.00 600,000.00 NGP (RIVERBANKS & OTHER SUITABLE PLACES & ANCESTRAL DOMAIN) 3,450,000.00 3,450,000.00 SCHOOL REPAIRS/REHABILITATION 2,500,000.00 2,500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 TRANSITION PROGRAM FOR CHILDREN/STUDENTS W/ SPECIAL NEEDS (SPED) 2,000,000.00 2,000,000.00 CONSTRUCTION OF STEEL FOOTBRIDGE 740,500.00 740,500.00 1) INFECTIOUS DISEASE CLUSTER (SCHISTOSOMIASIS & MALARIA CONTROL)- INTEGRATED REFRESHER COURSE FOR INFECTIOUS DISEASES; 2) INFECTIOUS DISEASE CLUSTER (SCHISTOSOMIASIS & MALARIA CONTROL)- INTEGRATED MICROSCOPY TRAINING FOR INFECTIOUS DISEASE; 3) EPIDEMIOLOGY & DISEASE SURVEILLANCE- CAPABILITY BUILDING ON DISEASE SURVEILLANCE (PIDSR); 4) EPIDEMIOLOGY & DISEASE SURVEILLANCE- NETWORKING OF DRU'S (QUARTERLY MEETING); 5) EPIDEMIOLOGY & DISEASE SURVEILLANCE- INFECTIOUS DISEASE CLUSTER (RABIES ELIMINATION CONTROL); 6) INFECTIOUS DISEASE CLUSTER (TUBERCULOSIS)- UPDATES ON THE DIAGNOSIS & TREATMENT MANAGEMENT; 7) INFECTIOUS DISEASE CLUSTER (TUBERCULOSIS)- DOTS TRAINING FOR HEALTH PERSONNEL (NTP-MDP); 8) INFECTIOUS DISEASE CLUSTER (STI/HIV/AIDS PREVENTION)- TRAINING FOR TOT & MODULAR & IMPLEMENTATION ON COMPREHENSIVE STI CASE MANAGEMENT; 9) INFECTIOUS DISEASE CLUSTER (STI/HIV/AIDS PREVENTION)- CAPABILITY BUILDING ON VOLUNTARY HIV COUNSELLING & TESTING; 10) INFECTIOUS DISEASE CLUSTER (STI/HIV/AIDS PREVENTION)- TRAINING OF ADDITIONAL PEER EDUCATORS; 11) INFECTIOUS DISEASE CLUSTER (STI/HIV/AIDS PREVENTION)- CAPABILITY BUILDING ON 100% CONDOM USE; 12) INFECTIOUS DISEASE CLUSTER (DENGUE CONTROL) 500,000.00 500,000.00 COMMUNITY HEALTH TEAM MOBILIZATION TRAINING 69,000.00 69,000.00 DOH COMPACK DRUGS 1,000,000.00 1,000,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT- PURCHASE OF TOILET BOWLS 1,845,000.00 1,845,000.00 MATERNAL NEONATAL CHILD HEALTH & NUTRITION (MNCHN) 500,000.00 500,000.00 INTEGRATED LIVELIHOOD PROGRAMS: STARTER KITS 2,000,000.00 2,000,000.00 INTEGRATED LIVELIHOOD PROGRAMS: MEAT PROCESSING 500,000.00 500,000.00 INTEGRATED LIVELIHOOD PROGRAMS: SACK MAKING 500,000.00 500,000.00 GENERIC BAKERY 500,000.00 500,000.00 HANDICRAFT PRODUCTION 500,000.00 500,000.00 INTEGRATED LIVELIHOOD PROGRAM (ESTABLISHMENT OF COFFEE PROCESSING FACILITIES) 2,500,000.00 2,500,000.00 COMMON SERVICE FACILITIES- PURCHASE OF PRODUCT PROCESSING FACILITIES 500,000.00 500,000.00 COMMON SERVICE FACILITIES- EQUIPMENT & FACILITIES FOR AVRC 500,000.00 500,000.00 HANDWASHING FACILITIES FOR DAY CARE CENTER 600,000.00 600,000.00 VARIOUS DTI IC PROJECTS 500,000.00 500,000.00 SMALL & MEDIUM ENTERPRISE DEVELOPMENT PROGRAMS (BAMBOOCRAFT) - BUSINESS DEVELOPMENT SERVICES (SUPPORT TO DAIRY PROCESSING PLANT) - CORE LOCAL ROAD REHABILITATION (SAND & GRAVELLING - 6.9 KMS.) 1,500,000.00 1,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TECHNOLOGY-BASED COMMUNITY TRAINING PROGRAM 1,500,000.00 1,500,000.00 1255 CITY OF VALENCIA 1,750,000.00 - - - 13,300,000.00 - - 8,000,000.00 1,000,000.00 4,450,000.00 - - - 1,500,000.00 30,000,000.00 LIVESTOCK DISPERSAL PROGRAM 1,750,000.00 1,750,000.00 VARIOUS DILG PROJECTS 10,000,000.00 10,000,000.00 DISTRIBUTION OF PIPELINES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE - PROVISION OF POTABLE WATER SUPPLY 3,300,000.00 3,300,000.00 VARIOUS DOLE PROJECTS 8,000,000.00 8,000,000.00 PROVISION OF STARTER KIT PROJECT W/ PROTECTIVE GEAR (CARPENTRY, MASON, PLUMBING, COSMETOLOGY, MASSAGE, BUILDING WIRING TOOLS & DRESSMAKING EQUIPMENT) - WORKERS INCOME AUGMENTATION PROGRAM (WINAP)- T- SHIRT & TARPAULIN PRINTING - WORKERS INCOME AUGMENTATION PROGRAM (WINAP)- RICE TRADING & MARKETING - WORKERS INCOME AUGMENTATION PROGRAM (WINAP)- HIGH VALUE VEGETABLES & SPICES - PROVISION OF MEAT PROCESSING EQUIPMENT LIKE GRINDER, FREEZER, ETC. FOR MASS PRODUCTION OF LONGGANIZA, CHORIZO, TAPA, ETC. - TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGE WORKERS (TUPAD) FOR UNEMPLOYED PROFESSIONALS - CONSTRUCTION OF PASALUBONG CENTER 1,000,000.00 1,000,000.00 VARIOUS DSWD PROJECTS 4,450,000.00 4,450,000.00 CONSTRUCTION OF CRISIS INTERVENTION CENTER - REPAIR & UPGRADING OF DAY CARE CENTERS - ROAD MAINTENANCE & REHABILITATION 1,500,000.00 1,500,000.00 1256 DAMULOG 1,400,000.00 - - - 1,500,000.00 - - 2,200,000.00 - - - - - 7,400,000.00 12,500,000.00 VARIOUS DA PROJECTS 1,400,000.00 1,400,000.00 ACQUISTION OF MOBILE SHELLERS - PROPOSED SHARED SERVICE FACILITIES MULTI-TILLER TRACTORS - PROPOSED ESTABLISHMENT OF NINE (9) MULTI PURPOSE DRYING PAVEMENT - STRENGTHENING PEOPLES ORGANIZATIONS 1,500,000.00 1,500,000.00 COWFATTENING 2,200,000.00 2,200,000.00 UPGRADING/CONCRETING OF SITIO NARUGARAN, MACAPARI FARM TO MARKET ROAD 3,000,000.00 3,000,000.00 UPGRADING/CONCRETING FARM TO MARKET ROAD 4,400,000.00 4,400,000.00 1257 DANGCAGAN 3,300,000.00 1,200,000.00 - 170,000.00 900,000.00 - - 900,000.00 - - - - - 6,030,000.00 12,500,000.00 CONSTRUCTION OF SAN VICENTE IRRIGATION CANAL 1,200,000.00 1,200,000.00 AGRI-BUSINESS ACTIVITIES (RUBBER, COCONUT, CACAO NURSERY PRODUCTION) 500,000.00 500,000.00 POST HARVEST FACILITIES (CONSTRUCTION OF 4 UNITS MPDP) 800,000.00 800,000.00 CONSTRUCTION OF DOLOROSA-BALOCBOCAN TRAMLINE 1,500,000.00 1,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 GULAYAN SA PAARALAN 170,000.00 170,000.00 SALINTUBIG PROJECT (OSMENA, FARMERS ASSOCIATION) 900,000.00 900,000.00 LIVELIHOOD PROGRAMS (DAY CARE WORKERS, WOMENS, PWD, RELIGIOUS ORG. & MSEAC MEMBER) 900,000.00 900,000.00 TO BE DETERMINED 230,000.00 230,000.00 CORE LOCAL ROAD REHABILITATION 5,800,000.00 5,800,000.00 1258 DON CARLOS 3,500,000.00 - - 1,800,000.00 3,780,000.00 - 1,920,000.00 - - 500,000.00 - - - 1,000,000.00 12,500,000.00 INFRA SUPPORT TO AGRICULTURE PRODUCTION FOR CORN 500,000.00 500,000.00 INFRA SUPPORT TO AGRICULTURE PRODUCTION FOR RICE 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 2,500,000.00 2,500,000.00 REPAIR/REHABILITATION/IMPROVEMENT OF 6 ELEMENTARY CLASSROOMS 1,800,000.00 1,800,000.00 EXPANSION/REHABILITATION OF PWS LEVEL III 3,780,000.00 3,780,000.00 PROCUREMENT OF HEALTH EQUIPMENT, INSTRUMENT, SUPPLIES & MEDICINES FOR RHU TB DOTS, MCP, PCB & BRGY HEALTH STATIONS OF SAN ROQUE, EMBAYAO, NEWVISAYAS, SAN FRANCISCO, KAWILIHAN, BISMARTZ, DON CARLOS NORTE, KALUBIHON, OLD NONGNONGAN, PUALAS, KIARA, BOCBOC, CALAOCALAO, SAN ANTONIO WEST, MARAYMARAY & SAN NICOLAS 1,920,000.00 1,920,000.00 PROVISION OF PLAYGROUND APPARATUS FOR SUPERVISED NEIGHBORHOOD PLAY (SNP) & DAY CARE CENTERS 500,000.00 500,000.00 REPAIR/IMPROV'T/REHAB OF ACCESS ROAD AT BRGY. MAHAYAHAY 1,000,000.00 1,000,000.00 1259 IMPASUG-ONG - - - - 3,500,000.00 - - - - - - - - 9,000,000.00 12,500,000.00 VARIOUS DILG PROJECTS 1,500,000.00 1,500,000.00 HABIOGAN FOOTBRIDGE - JUNCTION-KIMARAYO-ATUGAN FOOTBRIDGE (CAWAYAN-LA FORTUNA) - IMPROVEMENT OF WATER SYSTEM 2,000,000.00 2,000,000.00 DUMALAGUING-BUNDAAN CORE ROAD 9,000,000.00 9,000,000.00 1260 KADINGILAN 630,000.00 - - - 1,500,000.00 - - - - - - - - 10,370,000.00 12,500,000.00 PROVISION OF ADDITIONAL MACHINERY/EQUIPMENT FOR RUBBER PROCESSING 630,000.00 630,000.00 PROVISION OF POTABLE WATER SUPPLY SALINTUBIG, DEEP WELL LEVEL III 1,500,000.00 1,500,000.00 VARIOUS LGSF PROJECTS 6,300,000.00 6,300,000.00 CONCRETING OF BARANGAY ROAD- 0.200 KM. MABUHAY TO BALAORO BDRY. - CONCRETING OF BARANGAY ROAD- 0.100 KM. MATAMPAY ROAD SECTION - CONCRETING OF BARANGAY ROAD- 0.150 KM. CABADIANGAN ROAD-JUNCTION KIBALAGON & MATAMPAY ROAD - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONCRETING OF BARANGAY ROAD- 0.100 KM. KIBALAGON ROAD SECTION - CONCRETING OF BARANGAY ROAD- 0.050 KM. POBLACION TO SALVACION ROAD - CONCRETING OF BARANGAY ROAD- 0.100 KM. BAROY TO SIBONGA ROAD - CONCRETING OF BARANGAY ROAD- 0.100 KM. HUSAYAN ROAD SECTION - CONCRETING OF BARANGAY ROAD- 0.100 KM. PINAMANGGUAN ROAD SECTION 1,100,000.00 1,100,000.00 CONCRETING OF BARANGAY ROAD- 0.150 KM. BAGONGBAYAN TO PINAMANGGUAN BDRY. 1,650,000.00 1,650,000.00 CONCRETING OF BARANGAY ROAD- 0.120 KM. BALAORO TO SAN ROQUE ROAD 1,320,000.00 1,320,000.00 1261 KALILANGAN 4,400,000.00 - - 500,000.00 - - - - - 500,000.00 - - - 7,100,000.00 12,500,000.00 EQUIPMENT & FACILITY FOR MUSCOVADO PRODUCTION 2,000,000.00 2,000,000.00 CASSAVA POST HARVEST EQUIPMENT 1,000,000.00 1,000,000.00 NATIVE CHICKEN PRODUCTION 1,400,000.00 1,400,000.00 PROVISION OF SCHOOL FURNITURE 500,000.00 500,000.00 FLOOD CONTROL - INFRASTRUCTURE PROJECT 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 3,100,000.00 3,100,000.00 CORE LOCAL ROAD CONSTRUCTION - CORE LOCAL ROAD CONSTRUCTION 4,000,000.00 4,000,000.00 1262 KIBAWE 1,100,000.00 - - - 6,500,000.00 - - 500,000.00 - 1,300,000.00 - - - 3,100,000.00 12,500,000.00 PROVISION OF PRODUCTION & POST HARVEST FACILITIES- INFRASTRUCTURE SUPPORT TO AGRICULTURE & POST HARVEST FACILITIES & EQUIPMENT 130,000.00 130,000.00 PROVISION OF PRODUCTION & POST HARVEST FACILITIES- INFRASTRUCTURE SUPPORT TO AGRICULTURE & POST HARVEST FACILITIES & EQUIPMENT 130,000.00 130,000.00 PROVISION OF PRODUCTION & POST HARVEST FACILITIES- INFRASTRUCTURE SUPPORT TO AGRICULTURE & POST HARVEST FACILITIES & EQUIPMENT 130,000.00 130,000.00 PROVISION OF PRODUCTION & POST HARVEST FACILITIES- INFRASTRUCTURE SUPPORT TO AGRICULTURE & POST HARVEST FACILITIES & EQUIPMENT 143,000.00 143,000.00 PROVISION OF PRODUCTION & POST HARVEST FACILITIES- INFRASTRUCTURE SUPPORT TO AGRICULTURE & POST HARVEST FACILITIES & EQUIPMENT 200,000.00 200,000.00 PROVISION OF PRODUCTION & POST HARVEST FACILITIES- INFRASTRUCTURE SUPPORT TO AGRICULTURE & POST HARVEST FACILITIES & EQUIPMENT 167,000.00 167,000.00 PROVISION OF PRODUCTION & POST HARVEST FACILITIES- INFRASTRUCTURE SUPPORT TO AGRICULTURE & POST HARVEST FACILITIES & EQUIPMENT 200,000.00 200,000.00 CONSTRUCTION OF FOOTBRIDGE 2,000,000.00 2,000,000.00 RESCUE EQUIPMENT 500,000.00 500,000.00 SALINTUBIG (WATER SYSTEM) REHABILITATION OF WATER SYSTEM LEVEL II 4,000,000.00 4,000,000.00 DILP STARTER KITS CARPENTRY, MASON, MANICURE/PEDICURE, BARBER 500,000.00 500,000.00 PROVISION OF CAPITAL SEED FUND THRU DSWD-SEAK SCHEME 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 800,000.00 800,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (VEGETABLE) 800,000.00 800,000.00 VARIOUS LGSF PROJECTS 2,300,000.00 2,300,000.00 ROAD CONCRETING - ROAD CONCRETING - 1263 KITAOTAO 2,800,000.00 - - - - - - - 1,000,000.00 2,000,000.00 1,200,000.00 - - 5,500,000.00 12,500,000.00 NFRA SUPPORT TO AGRI & FISHERY PRODUCTION DEVELOPMENT (THRESHER) 500,000.00 500,000.00 NFRA SUPPORT TO AGRI & FISHERY PRODUCTION DEVELOPMENT (SHELLER) 500,000.00 500,000.00 PHF & EQUIPMENT 400,000.00 400,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD & OTHER AGRI- FISHERY BASED INVESTMENT 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD & OTHER AGRI- FISHERY BASED INVESTMENT 100,000.00 100,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD & OTHER AGRI- FISHERY BASED INVESTMENT 800,000.00 800,000.00 CONSTRUCTION OF PASALUBONG CENTER BRGY BENONI, MAHINOG, CAMIGUIN 1,000,000.00 1,000,000.00 KC-NCDDP PROJECT 1,000,000.00 1,000,000.00 KC-NCDDP PROJECT 1,000,000.00 1,000,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM 1,200,000.00 1,200,000.00 VARIOUS LGSF PROJECTS 1,500,000.00 1,500,000.00 REHABILITATION OF SAGUNDANON-SITIO MALINAO BRGY ROAD - REHABILITATION OF CABALANSIHAN-SALALAYAN BRGY ROAD - REHABILITATION OF PANGANAN-KIULOM BRGY ROAD - REHABILITATION OF SITIO TUPONGON-KIANLOD BRGY ROAD 2,000,000.00 2,000,000.00 REHABILITATION OF CABALANTIAN-SAGUNDANON BRGY ROAD 2,000,000.00 2,000,000.00 1264 LANTAPAN 800,000.00 - - - 670,000.00 - - 1,000,000.00 - 7,330,000.00 1,700,000.00 - - 1,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 800,000.00 800,000.00 LIVESTOCK & GOAT PRODUCTION - QUALITY SEEDS & PLANTING MATERIALS - FARM IMPLEMENTS & TOOLS - FOOTBRIDGE CONSTRUCTION 670,000.00 670,000.00 INTEGRATED LIVELIHOOD PROGRAM-WORKERS AUGMENTATION PROGRAM 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE LIVELIHOOD PROGRAM (SLP)- MICRO-ENTERPRISE DEVELOPMENT 1,700,000.00 1,700,000.00 REPAIR/UPGRADING OF DAY CARE CENTER 2,400,000.00 2,400,000.00 CONST. OF GROUP HANDWASHING FACILITIES IN DCC 1,080,000.00 1,080,000.00 PROVISION OF ECCD MATERIALS FOR DCC 2,150,000.00 2,150,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 PRODUCT DEVELOPMENT & TECHNOLOGY PROMOTION 500,000.00 500,000.00 COMMUNITY LAND CAPABILITY/LIVELIHOOD PROGRAM 700,000.00 700,000.00 LOCAL ROAD REHABILITATION 1,000,000.00 1,000,000.00 1265 LIBONA 1,750,000.00 - - 500,000.00 - - 600,000.00 2,700,000.00 - 1,400,000.00 - - 500,000.00 5,050,000.00 12,500,000.00 POST HARVEST FACILITIES & EQUIPMENT (MULTI PURPOSE DRYING PAVEMENT) 750,000.00 750,000.00 PROVISION OF DRAFT ANIMALS (CARABAO) W/ SMALL FARM IMPLEMENTS 500,000.00 500,000.00 SHEEP RAISING PROJECT (STARTER KITS) 500,000.00 500,000.00 ALS/OSY PROGRAMS: (LITERACY CUM LIVELIHOOD & TEACHING AIDS & MATERIALS W/ STARTER KITS) 500,000.00 500,000.00 REHABILITATION OF BHS KILIOG & NANGKA 600,000.00 600,000.00 BAMBOO PROCESSING PROJECT W/ STARTER KITS 700,000.00 700,000.00 PROVISION OF CARPENTRY STARTER/TOOL KIT 500,000.00 500,000.00 PROVISION OF LIVELIHOOD ON MEAT PROCESSING (CHORISO, TOCINO & LONGGANISA) 500,000.00 500,000.00 CALAMANSI JUICE PROJECT (TRAINING & EQUIPMENT, STARTER KITS) 500,000.00 500,000.00 POGO/QUAIL EGG PRODUCTION (TRAINING & STARTER KIT) 500,000.00 500,000.00 VARIOUS DSWD PROJECTS 1,400,000.00 1,400,000.00 CONSTRUCTION OF DAY CARE CENTER - CONSTRUCTION OF WOMEN CRISIS CENTER (W/ DESIGNATED ROOMS FOR EACH CASES OF WOMEN & GIRL-CHILD ABUSES) - INTEGRATED COMMUNITY FOOD PRODUCTION 550,000.00 550,000.00 REHAB. OF KALASUYAN-TAMUSAN ROAD 2,000,000.00 2,000,000.00 OPENING/CONST. OF PUTIAN-MANTABOO ROAD 2,500,000.00 2,500,000.00 TECHNOLOGY-BASED COMMUNITY TRAINING PROGRAM (TBCTP)/SKILLS TRAINING & ENTREPRENEURIAL DEVELOPMENT TRAINING (FOOD PROCESSING, CORN BASED-HANDICRAFT, SLAUGHTERING & BUTCHERING, PIPE FITTING & CUT FLOWERS) 500,000.00 500,000.00 1266 MALITBOG 3,500,000.00 - - 2,000,000.00 2,300,000.00 - - - 1,000,000.00 3,700,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,500,000.00 3,500,000.00 UPGRADING OF FOUR (4) UNITS OF COMMUNAL IRRIGATION PROJECTS - PROVISION OF MECHANICAL DRIER FOR CORN PRODUCTION IN THE MUNICIPALITY - REPAIR OF 26 CLASSROOM (24 ELEMENTARY & 2 SECONDARY SCHOOL) 2,000,000.00 2,000,000.00 PURCHASE OF ONE (1) UNIT RESCUE VEHICLE (KIA VAN 18 SITTERS) 1,300,000.00 1,300,000.00 IMPROVEMENTS OF KALINGKING WATER SUPPLY SYSTEM (LEVEL II) 1,000,000.00 1,000,000.00 CONSTRUCTION OF PASALUBONG CENTER 1,000,000.00 1,000,000.00 CONSTRUCTION OF ONE (1) UNIT DAY CARE CENTER 800,000.00 800,000.00 CONSTRUCTION OF ONE UNIT HOME FOR OLDER PERSONS 2,300,000.00 2,300,000.00 REPAIR/UPGRADING OF TWO (2) UNIT DAY CARE CENTERS 600,000.00 600,000.00 1267 MANOLO FORTICH - - - - 19,500,000.00 - - - - - - - - - 19,500,000.00 VARIOUS DILG PROJECTS 19,500,000.00 19,500,000.00 SO. BAGALANGIT, KALUGMANAN WATER SYSTEM- SALINTUBIG PROGRAM - SO. KIBUWALAN, KALUGMANAN WATER SYSTEM- SALINTUBIG PROGRAM - SO. GAURON & PROPER SANKANAN WATER SYSTEM- SALINTUBIG PROGRAM - SO. KITAM-IS, LUNOCAN WATER SYSTEM- SALINTUBIG PROGRAM - 1268 MARAMAG 8,000,000.00 - - 1,200,000.00 4,700,000.00 - - 4,900,000.00 - 700,000.00 - - - - 19,500,000.00 SUSTAINABLE AGRI-BUSINESS & RURAL ENTERPRISE DEVELOPMENT (SARED)- ARC CONNECTIVITY & ECONOMIC SUPPORT SERVICES (ARCCESS) 600,000.00 600,000.00 IRRIGATION PROJECT - SMALL WATER IMPOUNDING PROJECTS 2,000,000.00 2,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE-PRODUCTION 2,500,000.00 2,500,000.00 AGRO-PROCESSING FACILITIES - BANANA PROCESSING 600,000.00 600,000.00 AGRO-PROCESSING FACILITIES - MEAT PROCESSING & MEAT SHOP 1,300,000.00 1,300,000.00 SUSTAINABLE FISHERY BASED LIVELIHOOD PROJECT 500,000.00 500,000.00 SUSTAINABLE AGRI-LIVELIHOOD PROJECT - SEMI-RANGE BACKYARD SWINE & POULTRY PRODUCTION ADOPTING NATURE AGRICULTURE FARMING SYSTEM 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 1,200,000.00 1,200,000.00 VARIOUS DILG PROJECTS 3,000,000.00 3,000,000.00 FLOOD CONTROL- CONSTRUCTION OF DRAINAGE SYSTEM - FLOOD CONTROL- CONSTRUCTION OF DRAINAGE SYSTEM - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG)- PROVISION OF POTABLE WATER SUPPLY 700,000.00 700,000.00 CAPACITY BUILDING FOR CSOS 1,000,000.00 1,000,000.00 LIVELIHOOD ASSISTANCE (MICRO-FINANCE) 3,900,000.00 3,900,000.00 BACKYARD SWINE FATTENING 1,000,000.00 1,000,000.00 KAPIT-BISIG LABAN SA KAHIRAPAN- COMPREHENSIVE & INTEGRATED DELIVERY OF SOCIAL SERVICES (KC-NCDDP) PROJECT 700,000.00 700,000.00 1269 PANGANTUCAN 5,200,000.00 - - 3,544,000.00 - - 672,600.00 - - 1,950,000.00 2,900,000.00 - - 2,233,400.00 16,500,000.00 MORINGA MINI PROCESSING PLANT W/ FACILITIES & EQUIPMENTS 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORN PRODUCTION & POST HARVEST FACILITIES 1,200,000.00 1,200,000.00 PROVISION OF DRAFT ANIMALS (CARABAO) W/ SMALL FARM IMPLEMENTS 2,500,000.00 2,500,000.00 TRAINING OF FRESH WATER FISH PRODUCTION & ARTIFICIAL BREEDING 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: (PURCHASE OF CHAIRS) 504,000.00 504,000.00 BASIC EDUCATION FACILITIES (REPAIR/REHAB OF CLASSROOM) 2,700,000.00 2,700,000.00 GULAYAN SA PAARALAN 340,000.00 340,000.00 TRAINING HEALTH PROVIDERS ON BASIC EMERGENCY OBSTETRIC & NEWBORN CARE (BEMONC) 672,600.00 672,600.00 VARIOUS DSWD PROJECTS 1,950,000.00 1,950,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER - CONSTRUCTION OF GROUP HAND WASHING FACILITY IN DAY CARE CENTER (W/ COMPLETE SOAP & FLUORIDE GEL TOOTHPASTE) - ESTABLISHMENT OF MUNICIPAL SHELTERED WORKSHOP & AREA VOCATIONAL REHABILITATION CENTER - YAMAN PINOY (FOOD & VEGETABLE PROCESSING) 1,000,000.00 1,000,000.00 YAMAN PINOY (DRESS MAKING. SELF DEVELOPMENT & SKILLS TRAINING) 700,000.00 700,000.00 YAMAN PINOY (BAMBOO CRAFT DEVELOPMENT PROGRAM) 700,000.00 700,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (LIVESTOCK-NATIVE CHICKEN) 570,000.00 570,000.00 CONSTRUCTION OF CORE LOCAL ROAD GOING TO NAPALIT 1,663,400.00 1,663,400.00 1270 QUEZON 7,000,000.00 - 1,350,000.00 - 17,725,000.00 - - - - 450,000.00 900,000.00 - 675,000.00 1,900,000.00 30,000,000.00 VARIOUS NIA PROJECTS 4,000,000.00 4,000,000.00 IRRIGATION PROJECTS (SIP/STW/OSP) - IRRIGATION PROJECTS (SIP/STW/OSP) - INFRASTRUCTURE SUPPORT TO AGRI & FISHERY PRODUCTION & DEVELOPMENT - INFRASTRUCTURE SUPPORT TO AGRI & FISHERY PRODUCTION & DEVELOPMENT - INFRASTRUCTURE SUPPORT TO AGRI & FISHERY PRODUCTION & DEVELOPMENT - VARIOUS DA PROJECTS 3,000,000.00 3,000,000.00 AGRO-PROCESSING & EXPANDED AGRI-BUSINESS ACTIVITIES - LIVESTOCK & POULTRY PRODUCTION - ORGANIC FERTILIZER PRODUCTION - NATIONAL GREENING PROGRAM 1,350,000.00 1,350,000.00 VARIOUS DILG PROJECTS 3,325,000.00 3,325,000.00 CORE LOCAL ROADS CONSTRUCTION/ MAINTENANCE/ REHABILITATION 7,200,000.00 7,200,000.00 EVACUATION FACILITY - FLOOD CONTROL - SALINTUBIG 7,200,000.00 7,200,000.00 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS 450,000.00 450,000.00 VARIOUS DTI PROJECTS 900,000.00 900,000.00 MICRO ENTERPRISE DEVELOPMENT PROGRAM- HAT/MAT WEAVING - MICRO ENTERPRISE DEVELOPMENT PROGRAM- BAG MAKING - VARIOUS LGSF PROJECTS 1,900,000.00 1,900,000.00 CORE LOCAL ROADS CONSTRUCTION/ MAINTENANCE /REHABILITATION - CORE LOCAL ROADS CONSTRUCTION/ MAINTENANCE/ REHABILITATION - COMMUNITY BASED SKILLS TRAINING- COSMITOLOGY/CARPENTRY/DRESSMAKING 675,000.00 675,000.00 1271 SAN FERNANDO 2,088,000.00 - 1,500,000.00 1,180,000.00 2,300,000.00 - - - - 1,882,000.00 1,100,000.00 - - 2,450,000.00 12,500,000.00 VARIOUS DA PROJECTS 2,088,000.00 2,088,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENTS - SLOPING AGRICULTURAL LAND TECHNOLOGY (SALT)/AGRI- FISHERY TRAININGS & DEMO FARM ESTABLISHMENT - EXPANDED ORGANIC FERTILIZER PRODUCTION/SEEDS - TIGUA RIVERBANK AFFORESTATION (BAMBOO & ENDEMIC SPECIES) 1,500,000.00 1,500,000.00 REPAIR/REHABILITATION OF 13 CLASSROOMS FOR ELEMENTARY & SECONDARY SCHOOLS 650,000.00 650,000.00 IMPLEMENTATION & LANDSCAPING OF GULAYAN SA PAARALAN FOR ELEMENTARY & SECONDARY SCHOOLS 530,000.00 530,000.00 CONSTRUCTION OF MALAYANAN FOOTBRIDGE (PHASE II) 600,000.00 600,000.00 CONSTRUCTION OF HALAPITAN FOOTBRIDGE (PHASE II) 600,000.00 600,000.00 CONSTRUCTION OF CANDELARIA FOOTBRIDGE 600,000.00 600,000.00 REHABILITATION OF TUGOP WATER SYSTEM 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO-ENTERPRISE DEVELOPMENT TRACK 691,000.00 691,000.00 CONSTRUCTION OF DAY CARE CENTER 501,000.00 501,000.00 CONSTRUCTION OF GROUP HAND WASHING FACILITY OF DAY CARE CENTER (W/ COMPLETE SET OF SOAP & TOOTHPASTE IN 23 DCC) 690,000.00 690,000.00 YAMAN PINOY 600,000.00 600,000.00 INDUSTRY CLUSTERING PROGRAM OF BARANGAYS W/ ONE BARANGAY ONE PRODUCT (OBOP) 500,000.00 500,000.00 CONCRETING OF BARANGAY ROAD JUNCTION 1,200,000.00 1,200,000.00 CONCRETING OF BARANGAY ROAD JUNCTION 750,000.00 750,000.00 BARANGAY ROAD CONCRETING 500,000.00 500,000.00 1272 SUMILAO 500,000.00 - - - 9,500,000.00 - - - - 2,500,000.00 - - - - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 CONSTRUCTION OF 50 METERS STEEL FOOTBRIDGE 1,500,000.00 1,500,000.00 VARIOUS DILG PROJECTS 7,000,000.00 7,000,000.00 IMPROVEMENT OF POBLACION WATER SYSTEM - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS IMPROVEMENT OF KULASI WATER SYSTEM - CAPABILITY BUILDING OF SULOD 1,000,000.00 1,000,000.00 CONSTRUCTION OF CRISIS CENTER 2,500,000.00 2,500,000.00 1273 TALAKAG 9,122,500.00 - 800,000.00 1,600,000.00 1,000,000.00 - 500,000.00 500,000.00 - 5,382,500.00 1,595,000.00 - - 1,000,000.00 21,500,000.00 VARIOUS BFAR PROJECTS 750,000.00 750,000.00 INFRA SUPPORT & AGRI FISHERY PROD'N - INFRA SUPPORT & AGRI FISHERY PROD'N - VARIOUS DA PROJECTS 8,372,500.00 8,372,500.00 RICE PRODUCTION INPUT (ORGANIC) & RICE PRODUCTION FAC. - POST HARVEST FAC. & INPUTS - POST HARVEST FAC - POST HARVEST FAC - POST HARVEST FAC - HOG FATTENING - HOG FATTENING - RUBBER PRODUCTION - FARMERS INPUTS - ORGANIC CORN PRODUCTION (YELLOW) - ORGANIC FERTILIZER PROD'N - NATIONAL GREENING PROGRAM 800,000.00 800,000.00 CLASSROOM REPAIR/PROVISION OF SCH FURNITURE 500,000.00 500,000.00 REPAIR, REHAB & REPAINT OF ACADEMIC CLSRMS 500,000.00 500,000.00 CHILDREN W/ DISABILITY 600,000.00 600,000.00 CAPABILITY BLDG/SKILLS TRAINING & CLIMATE CHANGE ORIENTATION 1,000,000.00 1,000,000.00 RENOV OF BHS 500,000.00 500,000.00 INTEGRATED LIVELIHOOD PROGRAMS (WIN-AP) GARMENT MAKING 500,000.00 500,000.00 VARIOUS DSWD PROJECTS 5,382,500.00 5,382,500.00 CONST OF WOMENS CRISIS CENTER - CONST. OF DCC - REHAB OF DCC - BIGASAN NG BRGY - BIGASAN NG BAYAN - BIGASAN OUTLET - RUG MAKING 500,000.00 500,000.00 CERAMICS & POTTERY MAKING 595,000.00 595,000.00 CANDLE/SOAP MAKING 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PROD'N/ORGANIC FERTILIZER PROD'N/ORGANIC POULTRY RAISING 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 CAMIGUIN 10,225,000.00 1,000,000.00 - 3,550,000.00 15,175,000.00 - 2,784,000.00 - 4,000,000.00 11,775,000.00 500,000.00 - - 13,491,000.00 62,500,000.00 1274 CATARMAN 650,000.00 - - - 2,500,000.00 - - - - 3,850,000.00 - - - 5,500,000.00 12,500,000.00 GOAT RAISING PROJECT 650,000.00 650,000.00 LILOAN EVACUATION CENTER PROJECT 1,500,000.00 1,500,000.00 POBLACION-MANDUAO- WATERWORKS SYSTEM IMPROVEMENT PROJECT 1,000,000.00 1,000,000.00 REPAIR OF DAY CARE CENTERS PROJECT 1,800,000.00 1,800,000.00 ESTABLISHMENT OF OFFICE OF PERSONS WITH DISABILITIES PROJECT 1,000,000.00 1,000,000.00 ECCD LEARNING MATERIALS PROJECT 1,050,000.00 1,050,000.00 CONCRETING OF QUIDAG-UM BARANGAY ROAD CONNECTING PASANAN BARANGAY ROAD PROJECT 5,500,000.00 5,500,000.00 1275 GUINSILIBAN 3,800,000.00 - - 1,000,000.00 4,500,000.00 - - - - 2,100,000.00 500,000.00 - - 600,000.00 12,500,000.00 FARMERS LIVELIHOOD PROJECT 2,500,000.00 2,500,000.00 PRODUCTION OF TILAPIA ON EARTH PONDS 500,000.00 500,000.00 MOTORIZED BOAT AND FISHING NETS 800,000.00 800,000.00 RENOVATION OF GUINSILIBAN NATIONAL HIGH SCHOOL 1,000,000.00 1,000,000.00 EQUIPMENTS (COMMUNICATION AND RESCUE) OF BRGY DISASTER COMMAND CENTER AND MOBILITY IN 7 BRGYS 500,000.00 500,000.00 SALINTUBIG - 4 INTAKE TANKS AND BOOSTER PUMPS) AND DRAINAGE SYSTEM FOR BRGY BUTAY 4,000,000.00 4,000,000.00 RENOVATION OF 9 DAY CARE CENTERS WITH SCHOOL EQUIPMENTS AMENITIES AND LEARNING MATERIALS 2,100,000.00 2,100,000.00 ONE TOWN ONE PRODUCT (OTOP) TOOLS AND EQUIPMENTS, ENHANCEMENT AND FINANCIAL ASSISTANCE 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION ( BIO-ONG 1-BIO-ONG 2, MAAC, DAS-AG - PUNTOD, CABUAN) 600,000.00 600,000.00 1276 MAHINOG 1,500,000.00 1,000,000.00 - 500,000.00 1,000,000.00 - 1,284,000.00 - 4,000,000.00 - - - - 3,216,000.00 12,500,000.00 REHABILITATION OF IRRIGATION CANAL IN HUBANGON 1,000,000.00 1,000,000.00 MUNICIPAL MULTI-GEAR FISHING 500,000.00 500,000.00 CONSTRUCTION OF TRADING POST 1,000,000.00 1,000,000.00 REPAIR/REHABILITATION OF SCHOOL BUILDINGS 500,000.00 500,000.00 WATER SYSTEM DEVELOPMENT - TUPSAN PEQUENO 500,000.00 500,000.00 WATER SYSTEM DEVELOPMENT - BINALIWAN 500,000.00 500,000.00 INTEGRATED HEALTH SERVICES PROGRAM: A) MNCHN; B) CHT MOBILIZATION; C) RABIES ELIMINATION; D) TB CONTROL; E) STI/HIV AND AIDS PREVENTION; F) HEALTH EMERGENCY MNGT; G) HEALTH FACILITIES ENHANCEMENT PROGRAM 1,284,000.00 1,284,000.00 CONSTRUCTION OF PASALUBONG CENTER CUM CANTEEN IN MANTIGUE ISLAND 2,000,000.00 2,000,000.00 TOURIST FACILITY-PASALUBONG CENTER IN BARANGAY BENONI 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION - CONCRETING OF QUEOBE 1,500,000.00 1,500,000.00 VARIOUS LGSF PROJECTS 1,716,000.00 1,716,000.00 CORE LOCAL ROAD CONSTRUCTION - CONCRETING OF HUBANGON - CORE LOCAL ROAD CONSTRUCTION - CONCRETING OF BENONI - 1277 MAMBAJAO (CAPITAL) 3,775,000.00 - - 550,000.00 4,675,000.00 - - - - 1,625,000.00 - - - 1,875,000.00 12,500,000.00 INFRA SUPPORT PROGRAM TO FISHERY PRODUCTION 1,400,000.00 1,400,000.00 ORGANIC FERTILIZER PRODUCE 2,375,000.00 2,375,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR/REHABILITATION OF ALS BUILDING 550,000.00 550,000.00 RESCUE EQUIPMENT 1,175,000.00 1,175,000.00 SALINTUBIG 3,500,000.00 3,500,000.00 VARIOUS DSWD PROJECTS 1,625,000.00 1,625,000.00 REHABILITATION OF DAY CARE CENTERS - PROVISION OF ECCD LEARNING MATERIALS FOR DCCS - CORE LOCAL ROAD CONSTRUCTION - KATUBLI ROAD 1,875,000.00 1,875,000.00 1278 SAGAY 500,000.00 - - 1,500,000.00 2,500,000.00 - 1,500,000.00 - - 4,200,000.00 - - - 2,300,000.00 12,500,000.00 COLD STORAGE FACILITIES/VAN : MEAT MULTI-VAN 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF SPECIAL EDUCATION (SPED) BLDG. AT ALANGILAN INTEGRATED SCHOOL 1,500,000.00 1,500,000.00 EVACUATION CENTER 500,000.00 500,000.00 RESCUE EQUIPMENT: PROCUREMENT OF EQUIPMENT 500,000.00 500,000.00 SALINTUBIG: REHABILITATION OF WATER SUPPLY SYSTEM - OHAN SPRING (BACNIT) 500,000.00 500,000.00 SALINTUBIG: REHABILITATION OF WATER SUPPLY SYSTEM - SINABLAYAN SPRING (POBLACION) 500,000.00 500,000.00 SALINTUBIG: REHABILITATION OF WATER SUPPLY SYSTEM - PAMONGLO SPRING (POBLACION) 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM: COMMUNITY-BASED REHABILITATION CENTER 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICROENTERPRISE DEVELOPMENT TRACK 3,700,000.00 3,700,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS: COGON, POBLACION DAY CARE CENTER 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 2,300,000.00 2,300,000.00 CORE LOCAL ROAD CONSTRUCTION - SITIO DUMALIGPE ROAD CONCRETING (BACNIT) - CORE LOCAL ROAD CONSTRUCTION - ROSARIO ST. TO VASQUES ST. ROAD CONCRETING (POBLACION) - LANAO DEL NORTE 38,529,407.50 - 1,000,000.00 13,001,200.00 75,696,353.75 - 2,708,400.00 4,400,000.00 4,250,000.00 52,452,000.00 7,805,000.00 - 3,500,000.00 113,841,500.00 317,183,861.25 1279 BACOLOD 1,000,000.00 - - - 3,603,000.00 - - - - 7,897,000.00 - - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (A) MOTORIZED FISHING BOATS & (BI FISHNETS 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY 3,603,000.00 3,603,000.00 CONSTRUCTION OF EVACUATION CENTER 7,897,000.00 7,897,000.00 1280 BALOI 4,000,000.00 - - 1,500,000.00 5,500,000.00 - 600,000.00 1,000,000.00 - 2,400,000.00 - - - 500,000.00 15,500,000.00 MARKETING HAULING TRUCK FOR BRGY. LUMBAC 500,000.00 500,000.00 SOLAR DRYER IN SITIO LININDING 500,000.00 500,000.00 SOLAR DRYER 500,000.00 500,000.00 CATTLE FATTENING 500,000.00 500,000.00 CATTLE FATTENING 500,000.00 500,000.00 CATTLE FATTENING 500,000.00 500,000.00 CATTLE FATTENING 500,000.00 500,000.00 CATTLE FATTENING 500,000.00 500,000.00 REPAIR/REHABILITATION OF CLASSROOM (ADAPUN-ALI ES) 300,000.00 300,000.00 REPAIR/ REHABILITATION OF SCHOOL BUILDING MAMA-ANUN PRIMARY SCHOOL 300,000.00 300,000.00 REPAIR/ REHABILITATION OF SCHOOL BUILDING DADOAN ELEM. SCHOOL 300,000.00 300,000.00 REPAIR/ REHABILITATION OF SCHOOL BUILDING CADAYONAN ELEM. SCHOOL 300,000.00 300,000.00 REPAIR/ REHABILITATION OF SCHOOL BUILDING BALO-I NATIONAL HIGH SCHOOL 300,000.00 300,000.00 VARIOUS DILG PROJECTS 1,500,000.00 1,500,000.00 CONSTRUCTION OF FOOTBRIDGE - CONCRETING OF BARANGAY CORMATAN TO BARANGAY SIGAYAN FMR - CONCRETING OF PUROK SORIANO TO USMAN STREET - CONCRETING OF ABAGA TO BUENAVISTA FMR - CONSTRUCTION OF LEVEL II WATER SYSTEM 4,000,000.00 4,000,000.00 REPAIR & REHABILITATION OF BARANGAY HEALTH CENTER ABAGA 600,000.00 600,000.00 ABACA PRODUCTION 500,000.00 500,000.00 MUSHROOM PRODUCTION 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 800,000.00 800,000.00 CONSTRUCTION OF DAY CARE CENTER 800,000.00 800,000.00 CONSTRUCTION OF DAY CARE CENTER 800,000.00 800,000.00 CONCRETING RIVERSIDE TO PROVINCIAL ROAD 500,000.00 500,000.00 1281 BAROY 2,480,000.00 - - 3,458,000.00 1,891,753.75 - - - - 3,000,000.00 - - - 2,200,000.00 13,029,753.75 IRRIGATION PROJECTS (STW) 1,000,000.00 1,000,000.00 INFRA SUPPORT TO AGRI-FISHERY PRODUCTION 850,000.00 850,000.00 ORGANIC FERTILIZER PRODUCTION 630,000.00 630,000.00 BASIC EDUCATION FACILITIES (REPAIR/REHABILITATION OF CLASSROOMS) 600,000.00 600,000.00 BASIC EDUCATION FACILITIES (REPAIR/REHABILITATION OF CLASSROOMS) 600,000.00 600,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 GULAYAN SA PAARALAN 10,000.00 10,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM (ALS-OHSP OPEN HIGH SCHOOL PROGRAM 2,138,000.00 2,138,000.00 WATER SUPPLY DEVELOPMENT PROJECT 1,891,753.75 1,891,753.75 SUSTAINABLE LIVELIHOOD PROGRAM FOR AGRI-FISHERY BASED & OTHER BUSINESS INVESTMENTS 3,000,000.00 3,000,000.00 CONCRETING OF BARANGAY ANDIL TO TINUBDAN ROAD 1,100,000.00 1,100,000.00 CONCRETING OF DALAMA ROAD & PENDULONAN ROAD 1,100,000.00 1,100,000.00 1282 ILIGAN CITY 7,000,000.00 - 1,000,000.00 - 8,500,000.00 - - - 500,000.00 3,500,000.00 4,500,000.00 - 3,500,000.00 1,500,000.00 30,000,000.00 VARIOUS DA PROJECTS 7,000,000.00 7,000,000.00 RAINWATER CATCHMENT - POST-HARVEST FACILITIES & EQUIPMENT (MECHANICAL DRYERS, MULTI-PURPOSE DRYING PAVEMENT - COLD STORAGE FACILITIES/VAN - SUSTAINABLE ORGANIC VEGETABLE & FOOD CROP PRODUCTION - SUSTAINABLE ORGANIC LIVESTOCK PRODUCTION - SUSTAINABLE ORGANIC BANANA PRODUCTION - DISTRIBUTION OF FARM IMPLEMENTS & TOOLS - ORGANIC FERTILIZER PRODUCTION ENHANCEMENT &FURTHER PRODUCT DEVELOPMENT - MANDULOG WATERSHED PROTECTION & REHABILITATION 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 8,500,000.00 8,500,000.00 VALUES ENHANCEMENT & CAPACITY BUILDING FOR CIVIL SOCIETY ORGANIZATIONS - IMPROVEMENT OF PUBLIC BUILDING TO BECOME RESILIENT EVACUATION-READY WITH COMPLETE EMERGENCY & SURVIVAL FACILITIES - DEVELOPING PASALUBONG CENTER 500,000.00 500,000.00 VARIOUS DSWD PROJECTS 3,500,000.00 3,500,000.00 IMPROVING EDUCATION & CULTURAL FACILITIES FOR MUSLIMS & INDIGENOUS PEOPLE - REPAIR & UPGRADING OF PROTECTIVE SERVICE CENTERS FOR CHILDREN - STREET LIGHTING FOR RELOCATION SITES & CRITICAL URBAN AREAS - SHARED SERVICE FACILITY-LIVELIHOOD CENTER IMPROVEMENT 750,000.00 750,000.00 INDUSTRY CLUSTER DEVELOPMENT PROGRAM 3,750,000.00 3,750,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,500,000.00 1,500,000.00 LIVELIHOOD SKILLS ENHANCEMENT WITH LIVELIHOOD DEVELOPMENT SUPPORT 3,500,000.00 3,500,000.00 1283 KAPATAGAN 4,000,000.00 - - - - - - - - 6,000,000.00 - - - 5,500,000.00 15,500,000.00 POST HARVEST FACILITIES & EQUIPMENT (CONSTRUCTION OF CORNMILL & MINI WAREHOUSE WITH MPDP) 1,000,000.00 1,000,000.00 MARINE RESERVED & FISH SANCTUARIES (REHABILITATION OF FISH SANCTUARY WATCH STATION) 3,000,000.00 3,000,000.00 UPGRADING OF EVACUATION CENTER FACILITIES (PHASE 1) 6,000,000.00 6,000,000.00 CONCRETING OF KAPATAGAN-SAPAD ACCESS ROAD 5,500,000.00 5,500,000.00 1284 KAUSWAGAN 600,000.00 - - 2,150,000.00 1,000,000.00 - - 2,500,000.00 - 1,300,000.00 - - - 4,950,000.00 12,500,000.00 CONSTRUCTION OF SOLAR DRYER 600,000.00 600,000.00 REHABILITATION OF SCHOOL BUILDINGS 2,150,000.00 2,150,000.00 DEVELOPING OF LEVEL II WATER SYSTEM (KAWIT OR, LIBERTAD, TACUB, BAGUMBAYAN, & PAITON 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM TO ASSOCIATIONS & INFORMAL SETTLERS 2,000,000.00 2,000,000.00 LIVELIHOOD PROGRAM FOR TRICYLE DRIVERS 500,000.00 500,000.00 CONSTRUCTION 1 UNIT DAY CARE CENTER 1,000,000.00 1,000,000.00 RENOVATION OF BARANGAY DELABAYAN DAY CARE CENTER 300,000.00 300,000.00 DEVELOPMENT/CONSTRUCTION OF ACCESS ROAD (TUGAR, TINGINTINGIN, INUDARAN, PAITON, KAWIT OR BAGUMBAYAN) 4,950,000.00 4,950,000.00 1285 KOLAMBUGAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 SEAWALL PROJECT 12,500,000.00 12,500,000.00 1286 LALA 1,000,000.00 - - 1,200,000.00 1,600,000.00 - - - - 3,200,000.00 - - - 7,500,000.00 14,500,000.00 PURCHASE OF ONE (1) UNIT (35 HP) FARM TRACTOR 1,000,000.00 1,000,000.00 REPAIR OF SCHOOL BUILDING @ SAAVEDRA ELEM. SCHOOL 600,000.00 600,000.00 REPAIR OF SCHOOL BUILDING @ LANIPAO ELEM. SCHOOL 600,000.00 600,000.00 CONSTRUCTION OF HANGING BRIDGE @ SIMPAK (PUROK 10- PUROK11) 1,600,000.00 1,600,000.00 CONSTRUCTION OF SANTA TERESITA CRUZ LOWER DAY CARE CENTER 800,000.00 800,000.00 CONSTRUCTION OF PENDULONAN DAY CARE CENTER 800,000.00 800,000.00 CONSTRUCTION OF MATAMPAY BUCANA DAY CARE CENTER 800,000.00 800,000.00 CONSTRUCTION OF DARUMAWANG DAY CARE CENTER 800,000.00 800,000.00 CONCRETING OF LANIPAO BRGY. ROAD (SITIO PANGULI-BADAC 10 7,500,000.00 7,500,000.00 1287 LINAMON 990,000.00 - - 990,000.00 1,201,600.00 - 608,400.00 900,000.00 2,750,000.00 2,160,000.00 1,400,000.00 - - 1,500,000.00 12,500,000.00 RIVERSIDE FISHERFOLKS PROGRAM (TILAPIA FISHCAGE & FREE RANGE CHICKEN) (LAYER TYPE & MEAT TYPE) 540,000.00 540,000.00 ORGANIC FERTILIZER PRODUCTION 450,000.00 450,000.00 REHABILITATION OF CLASSROOMS, LINAMON CS 810,000.00 810,000.00 GULAYAN SA PAARALAN, LINAMON CS 63,000.00 63,000.00 ALTERNATIVE LEARNING SYSTEM, LINAMON CS 117,000.00 117,000.00 CONSTRUCTION OF EVACUATION CENTER (UPPER MAGO-ONG- UBALDO LOT) 1,201,600.00 1,201,600.00 UPGRADING OF 5 BARANGAY HEALTH CENTERS (BH'S) 608,400.00 608,400.00 BUKO PIE ENHANCEMENT PROJECT LOFWA 450,000.00 450,000.00 PASALUBONG ENHANCEMENT PROGRAM 450,000.00 450,000.00 ENTERPRISE DEVELOPMENT/ LINAMON PASALUBONG CENTER 1,800,000.00 1,800,000.00 HOMESTAY PROGRAM (LIBRO) 450,000.00 450,000.00 RURAL MICRO-ENTERPRISE DEVELOPMENT (TOUR GUIDES ASSO.) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,160,000.00 2,160,000.00 YAMAN PINOY 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REVISION OF MUNICIPAL INVESTMENT AND INCENTIVE CODE 900,000.00 900,000.00 CONCRETING FARM TO MARKET ROAD (MAGO-ONG TO BOSQUE) 1,500,000.00 1,500,000.00 1288 MAGSAYSAY 300,000.00 - - 500,000.00 - - 500,000.00 - - 2,700,000.00 - - - 8,500,000.00 12,500,000.00 CONSTRUCTION OF TRADING POST FOR DAAN CAMPO FARMERS MULTI-PURPOSE COOPERATIVE (DCFMPC) 300,000.00 300,000.00 LIVELIHOOD PROGRAM FOR THE OUT-OF-SCHOOL-YOUTH UNDERTHE ALTERNATIVE LEARNING SYSTEM OF DEP-ED 500,000.00 500,000.00 HMEM TRAINING - TRAINING ON BEMONC, CHT MOBILIZATION, CHT TEAMS HOME VISIT 500,000.00 500,000.00 UPGRADING OF BRGY. DAAN CAMPO & LUMBAC DAY CARE CENTER 600,000.00 600,000.00 CONSTRUCTION OF DURIANON DAY CARE CENTER 800,000.00 800,000.00 CONSTRUCTION OF EVACUATION CENTER IN BRGY. POBLACION 1,300,000.00 1,300,000.00 VARIOUS LGSF PROJECTS 2,500,000.00 2,500,000.00 CONCRETING OF ACCESS ROAD FROM BRGY. LUMBAC ROAD TO SPRING WATER SOURCE - CONCRETING OF OLANGO ACCESS ROAD FROM NATIONAL HIGHWAY TO OLANGO ELEM. SCHOOL - INTEGRATED COMMUNITY FOOD PRODN. 350,000.00 350,000.00 SPOT CONCRETING OF BRGY. DAAN CAMPO-TOMBADOR ACCESS ROAD 5,650,000.00 5,650,000.00 1289 MAIGO 1,100,000.00 - - - 7,400,000.00 - - - - 3,000,000.00 - - - 1,000,000.00 12,500,000.00 MECHANICAL DRYER 600,000.00 600,000.00 ESTABLISHMENT OF FISH SANCTUARY 500,000.00 500,000.00 VARIOUS DILG PROJECTS 6,400,000.00 6,400,000.00 MAIGO PUBLIC MARKET RENOVATION - FLOOD CONTROL DREDDGING - CONCRETING OF PUROK POBLACION - RUBBER BOAT/RESCUE EQUIPMENT - FLOOD CONTROL AT BUCANA - WATER SUPPLY SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 3,000,000.00 3,000,000.00 ROAD REHABILITATION 1,000,000.00 1,000,000.00 1290 MATUNGAO - - - - - - - - - 600,000.00 - - - 11,900,000.00 12,500,000.00 CONSTRUCTION OF DAY CARE CENTER 600,000.00 600,000.00 CONCRETING OF SITIO SENDEG, BRGY. PASAYANON FARM TO MARKET ROAD 7,600,000.00 7,600,000.00 CONCRETING OF BRGY. POBLACION TO PANGI ROAD (MUNICIPAL HALL-HEALTH CENTER) 4,300,000.00 4,300,000.00 1291 MUNAI - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CONCRETING OF LOCAL ROAD 7,500,000.00 7,500,000.00 CONCRETING OF LOCAL ROAD WITH PROVISION OF OVERFLOW BRIDGE 5,000,000.00 5,000,000.00 1292 NUNUNGAN - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CONSTRUCTION OF ACCESS ROAD 6,750,000.00 6,750,000.00 CONSTRUCTION OF ACCESS ROAD 5,750,000.00 5,750,000.00 1293 PANTAO RAGAT 1,300,000.00 - - - 3,700,000.00 - 1,000,000.00 - - - - - - 6,500,000.00 12,500,000.00 GOAT PRODUCTION 800,000.00 800,000.00 POULTRY RAISING 500,000.00 500,000.00 EVACUATION FACILITIES 2,200,000.00 2,200,000.00 PROCUREMENT OF RESCUE EQUIPMENT (FOTON CAR) DUMP TRUCK 1 UNIT 1,500,000.00 1,500,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 500,000.00 500,000.00 RNHEALS 500,000.00 500,000.00 CONSTRUCTION OF FARM TO MARKET ROAD 6,500,000.00 6,500,000.00 1294 PANTAR - - - 2,000,000.00 5,700,000.00 - - - - 4,800,000.00 - - - - 12,500,000.00 BASIC EDUCATIONAL FACILITIES/REPAIR OF SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 BASIC EDUCATIONAL FACILITIES/REPAIR OF SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 PROVISION OF POTABLE WATER SUPPLY 5,140,000.00 5,140,000.00 PROVISION OF POTABLE WATER SUPPLY (DL1) 560,000.00 560,000.00 DAY CARE CENTER BUILDING 800,000.00 800,000.00 DAY CARE CENTER BUILDING 800,000.00 800,000.00 DAY CARE CENTER BUILDING 800,000.00 800,000.00 DAY CARE CENTER BUILDING 800,000.00 800,000.00 DAY CARE CENTER BUILDING 800,000.00 800,000.00 DAY CARE CENTER BUILDING 800,000.00 800,000.00 1295 POONA PIAGAPO - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CONCRETING OF ROAD OF 1.5 KM, ALONG THE MUNICIPAL ROAD HIGHWAY 12,500,000.00 12,500,000.00 1296 SALVADOR - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF EVACUATION CENTER 7,500,000.00 7,500,000.00 CONSTRUCTION OF PROTECTION WALL-FLOOD CONTROL INB POBLACION, SALVADOR LDN 5,000,000.00 5,000,000.00 1297 SAPAD 1,000,000.00 - - - - - - - - 9,595,000.00 1,905,000.00 - - - 12,500,000.00 GINGER & TURIMERIC PRODUCTION 1,000,000.00 1,000,000.00 4 DAY CARE CENTER 4,095,000.00 4,095,000.00 CORE SHELTER AT DISASTER PHRONE AREA 4,500,000.00 4,500,000.00 POBLACION AREA CONCRETE DRAINAGE @ PUROK-1,4 & 13 1,000,000.00 1,000,000.00 COCO COIR PRODUCTION 1,905,000.00 1,905,000.00 1298 SULTAN NAGA DIMAPORO 8,359,407.50 - - 503,200.00 - - - - - - - - - 7,150,000.00 16,012,607.50 HOG FATTENING 678,000.00 678,000.00 PROVISISON OF POST-HARVEST FACILITIES TO LEVEL-UP THE ORGANIC RICE PRODUCTION OF SMALL FARMERS 1,262,700.00 1,262,700.00 ACQUISITION OF MOBILE CORN MILL, SOLAR DRYER & WAREHOUSETO HELP AUGMENT THE INCOME OF FARMERS IN 7 BARANGAYS 732,000.00 732,000.00 PROVISION OF PRE & POST HARVEST FACILITIES TO LEVEL UP THE PRODUCTION OF SMALL FARMERS IN RAMAIN 803,000.00 803,000.00 PROVISION OF POST-HARVEST FACILITIES& RICE & CORN PRODUCTION OF SMALL FARMERS 561,807.50 561,807.50 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS DEVELOPING UPLAND FARMERS PRODUCTIVITY THRU PROVISION OF OPV CORN SEEDS & ENHANCED PRE & POST HARVEST FACILITIES 2,950,000.00 2,950,000.00 ACQUISITION OF POST HARVEST-FACILITIES 1,371,900.00 1,371,900.00 MAJOR REPAIR OF 8 CLASSROOMS & MINOR REPAIR OF 1 CLASSROOM 503,200.00 503,200.00 TO BE IDENTIFIED 550,000.00 550,000.00 REHABILITATION OF 2 KMS. ACCESS ROAD OF BANSARVIL II GOING TO CALUBE 6,600,000.00 6,600,000.00 1299 TAGOLOAN - - - 700,000.00 - - - - - 2,300,000.00 - - - 9,500,000.00 12,500,000.00 REHABILITATION OF 2 UNITS CLASSROOM IN DARIMBANG PRIMARY SCHOOL 700,000.00 700,000.00 CONSTRUCTION OF EVACUATION CENTER WITH TOILETS FOR MEN, WOMEN, & PWD 2,300,000.00 2,300,000.00 CONCRETING OF DIMAYON TO PANALAWAN ROAD 7,500,000.00 7,500,000.00 CONCRETING OF BRGY. INAGONGAN ROAD 2,000,000.00 2,000,000.00 1300 TANGCAL 500,000.00 - - - 3,000,000.00 - - - - - - - - 8,141,500.00 11,641,500.00 PRODUCTION OF ORGANIC FERTILIZER 500,000.00 500,000.00 EVACUATION CENTER 3,000,000.00 3,000,000.00 ACCESS ROAD 8,141,500.00 8,141,500.00 1301 TUBOD (CAPITAL) 4,900,000.00 - - - 7,600,000.00 - - - 1,000,000.00 - - - - - 13,500,000.00 ESTABLISHMENT OF SOLAR DRIER 400,000.00 400,000.00 BANANA PRODUCTION (LATUNDAN) 500,000.00 500,000.00 BANANA PRODUCTION 500,000.00 500,000.00 INTEGRATED POULTRY (BROILER) & ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 CORN-CASSVA PRODUCTION 500,000.00 500,000.00 CORN-CASSVA PRODUCTION 500,000.00 500,000.00 PEANUT PRODUCTION 500,000.00 500,000.00 CONSTRUCTION OF FISH LANDING FACILITY 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 2,800,000.00 2,800,000.00 CONSTRUCTION OF FOOTBRIDGE - FLOOD CONTROL CANAL - CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL III PROJECT 1,200,000.00 1,200,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL III PROJECT 800,000.00 800,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL III PROJECT 1,000,000.00 1,000,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL III PROJECT 1,000,000.00 1,000,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL III PROJECT 800,000.00 800,000.00 PASALUBONG CENTER 1,000,000.00 1,000,000.00 MISAMIS OCCIDENTAL 39,847,498.00 2,000,000.00 812,500.00 2,500,000.00 56,800,001.00 - 3,000,000.00 4,713,000.00 2,000,000.00 11,850,000.00 4,663,251.00 - 536,200.00 96,240,800.00 224,963,250.00 1302 ALORAN - - - - 10,000,000.00 - 500,000.00 - - 500,000.00 - - - 1,500,000.00 12,500,000.00 REPAIR OF DALISAY-PALAYAN HANGING FOOTBRIDGE 500,000.00 500,000.00 EXPANSION AND IMPROVEMENT OF AWAS 9,500,000.00 9,500,000.00 CONSTRUCTION OF COMMUNAL TOILETS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 500,000.00 500,000.00 CONCRETING OF PELONG BARANGAY ROAD 1,500,000.00 1,500,000.00 1303 BALIANGAO - - - - 4,250,000.00 - - - - - - - - 8,250,000.00 12,500,000.00 PROPOSED EVACUATION FACILITY (1 UNIT EVACUATION CENTER) 500,000.00 500,000.00 PROPOSED EVACUATION FACILITY (1 UNIT EVACUATION CENTER) 500,000.00 500,000.00 PROPOSED EVACUATION FACILITY (1 UNIT EVACUATION CENTER) 500,000.00 500,000.00 PROPOSED EVACUATION FACILITY (1 UNIT EVACUATION CENTER) 1,100,000.00 1,100,000.00 PROPOSED RESCUE EQUIPMENT (1 MINI DUMP TRUCK) 650,000.00 650,000.00 PROPOSED 1 SET RESCUE EQUIPMENT PRESCRIBED BY OFFICE OF CIVIL DEFENSE DND 1,000,000.00 1,000,000.00 PROPOSED CORE LOCAL ROAD REHABILITATION (SAND & GRAVEL "DOUBLE LANE") 1,350,000.00 1,350,000.00 PROPOSED CORE LOCAL ROAD REHABILITATION (SAND & GRAVEL "DOUBLE LANE") 1,400,000.00 1,400,000.00 PROPOSED CORE LOCAL ROAD REHABILITATION (SAND & GRAVEL "DOUBLE LANE") 1,600,000.00 1,600,000.00 PROPOSED CORE LOCAL ROAD REHABILITATION (SAND & GRAVEL "DOUBLE LANE") 900,000.00 900,000.00 PROPOSED CORE LOCAL ROAD CONSTRUCTION (CONCRETE) 600,000.00 600,000.00 VARIOUS LGSF PROJECTS 2,400,000.00 2,400,000.00 PROPOSED CORE LOCAL ROAD REHABILITATION (SAND & GRAVEL "DOUBLE LANE") - PROPOSED CORE LOCAL ROAD REHABILITATION (SAND & GRAVEL "DOUBLE LANE") - PROPOSED CORE LOCAL ROAD REHABILITATION (SAND & GRAVEL "DOUBLE LANE") - 1304 BONIFACIO 500,000.00 - - 500,000.00 2,000,000.00 - - - - 550,000.00 - - - 8,950,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION-VERMI CAST PRODUCTION 500,000.00 500,000.00 ABOT-ALAM PROGRAM 500,000.00 500,000.00 FLOOD CONTROL 2,000,000.00 2,000,000.00 KC-NCDDP 550,000.00 550,000.00 CORE LOCAL ROAD CONSTRUCTION 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION 8,450,000.00 8,450,000.00 1305 CALAMBA 500,000.00 - - 1,500,000.00 7,550,000.00 - 500,000.00 500,000.00 - 1,000,000.00 - - - 950,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 REPAIR OF CLASSROOMS 1,000,000.00 1,000,000.00 FABRICATION OF SCHOOL DISKS 500,000.00 500,000.00 VARIOUS DILG PROJECTS 3,050,000.00 3,050,000.00 CONSTRUCTION OF HANGING BRIDGE - IMPROVEMENT OF EVACUATION CENTER - IMPROVEMENT OF EVACUATION CENTER - IMPROVEMENT OF EVACUATION CENTER - CONTRUCTION OF CALAMBA MARKET STALLS - CONSTRUCTION OF DRAINAGE CANAL - EXPANSION OF WATER SYSTEM LEVEL II 1,000,000.00 1,000,000.00 EXPANSION OF WATER SYSTEM LEVEL II 500,000.00 500,000.00 EXPANSION OF WATER SYSTEM LEVEL II 1,500,000.00 1,500,000.00 EXPANSION OF WATER SYSTEM LEVEL II 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS IMPROVEMENT OF WATER SYSTEM 500,000.00 500,000.00 PURCHASE OF RHU BASIC EQUIPMENT & INSTRUMENT 500,000.00 500,000.00 CAPABILITY BUILDING/ SKILLS TRAINING & PROVISION OF STARTER KIT FOR OUT OF SCHOOL YOUTH 500,000.00 500,000.00 INSTALLATION OF HAND WASHING FACILITIES TO 20 DAY CARE CENTERS 1,000,000.00 1,000,000.00 CONSTRUCTION/CONCRETING OF CORE LOCAL ROAD TO TOURIST SPOT- SAN ISIDRO WATER FALLS 950,000.00 950,000.00 1306 CLARIN 5,000,000.00 - - - 3,000,000.00 - - - - - - - - 4,500,000.00 12,500,000.00 TRAMLINES 4,400,000.00 4,400,000.00 ORGANIC FERTILIZER PRODUCTION 600,000.00 600,000.00 CONTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 3,000,000.00 3,000,000.00 CONCRETING OF ACCESS ROADS 4,500,000.00 4,500,000.00 1307 CONCEPCION - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CORE LOCAL ROAD CONSTRUCTION 12,500,000.00 12,500,000.00 1308 DON VICTORIANO CHIONGBIAN - - - - - - - - - 1,000,000.00 - - - 11,500,000.00 12,500,000.00 CONSTRUCTION OF INDIGENOUS PEOPLE (IP) CENTER 1,000,000.00 1,000,000.00 UPGRADING-CONCRETING OF SALUG-LALUD ROAD SECTION 6,000,000.00 6,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 UPGRADING CONCRETING OF TUNO ROAD SECTION 5,000,000.00 5,000,000.00 1309 JIMENEZ 500,000.00 - - - 11,000,000.00 - 500,000.00 - 500,000.00 - - - - - 12,500,000.00 LEARNING FARM-ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 CONCRETING BARANGAY NACIONAL-LASTA STREET 2,000,000.00 2,000,000.00 REHABILITATION OF FLOOD CONTROL-RIZAL STREET 500,000.00 500,000.00 REHABILITATION & IMPROVEMENT OF MUNICIPAL POTABLE WATER SUPPLY 8,500,000.00 8,500,000.00 HEALTH EMERGENCY MANAGEMENT TRAINING 500,000.00 500,000.00 CONSTRUCTION OF JIMENEZ CULTURAL HERITAGE TOURISM INFORMATION CENTER & SOUVENIR SHOP 500,000.00 500,000.00 1310 LOPEZ JAENA 5,700,000.00 - - 500,000.00 1,500,000.00 - 1,000,000.00 500,000.00 500,000.00 1,300,000.00 - - - 1,500,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO TO AGRICULTURE PRODUCTION & DEVELOPMENT (TRACTOR) 2,400,000.00 2,400,000.00 POST HARVEST FACILITIES 500,000.00 500,000.00 COLD STORAGE (PURCHASE OF 1 UNIT LIQUID FREEZE MACHINE) 1,800,000.00 1,800,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD (FISH CAGE PROJECT) 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 500,000.00 500,000.00 IMPROVEMENT/ EXPANSION OF THE LOPEZ JAENA URBAN WATER SUPPLY SYSTEM PHASE II 1,500,000.00 1,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 500,000.00 500,000.00 LOCAL TOURISM DEVELOPMENT PROJECT IN COASTAL BARANGAYS 500,000.00 500,000.00 PROTECTIVE SERVICES INFRASTRUCTURE 800,000.00 800,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DCC'S & SUPERVISED NEIGHBORHOOD PLAYGOUPS 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 CORE LOCAL ROAD CONST./ MAINTENANCE/REHAB. (CONCRETE) 1,000,000.00 1,000,000.00 1311 OROQUIETA CITY (CAPITAL) - - - - 3,000,000.00 - - - - - - - - 9,500,000.00 12,500,000.00 WATER SYSTEM PROJECT 1,000,000.00 1,000,000.00 WATER SYSTEM PROJECT 1,000,000.00 1,000,000.00 WATER SYSTEM PROJECT 1,000,000.00 1,000,000.00 VARIOUS LGSF PROJECTS 5,500,000.00 5,500,000.00 ROAD CONCRETING - ROAD CONCRETING - ROAD CONCRETING - ROAD CONCRETING - ROAD CONCRETING 2,000,000.00 2,000,000.00 ROAD CONCRETING 2,000,000.00 2,000,000.00 1312 OZAMIZ CITY 9,860,000.00 2,000,000.00 - - 500,000.00 - - 500,000.00 - 2,000,000.00 2,400,000.00 - - 8,240,000.00 25,500,000.00 IRRIGATION PROJECT (TABID IRRIGATION REHAB) 2,000,000.00 2,000,000.00 INFRA SUPPORT TO AGRI PRODUCTION (ACQUISITION OF 2 UNIT DRUM SEEDER) 50,000.00 50,000.00 INFRA SUPPORT TO AGRI PRODUCTION (ACQUISITION OF 5 RICE CUTTERS/HARVESTERS) 110,000.00 110,000.00 INFRA SUPPORT TO AGRI PRODUCTION (ACQUISITION OF RICE PLANTER) 350,000.00 350,000.00 INFRA SUPPORT TO AGRI PRODUCTION (ACQUISITION OF 4 UNIT TRESHER) 572,000.00 572,000.00 INFRA SUPPORT TO AGRI PRODUCTION (ACQUISITION OF 4 UNIT HAND TRACTORS) 488,000.00 488,000.00 POST HARVEST FACILITIES (CONSTRUCTION OF PALYA SHED) 450,000.00 450,000.00 INFRA SUPPORT TO AGRI PRODUCTION (ACQUISITION OF 1 UNIT FARM TRACTORS) 2,040,000.00 2,040,000.00 MECHANICAL DRYER GANGO 600,000.00 600,000.00 SUSTAINABLE AGRI LIVELIHOOD PROJECT (MULTI PURPOSE DRYING PAVEMENT (MPDP)) 600,000.00 600,000.00 SUSTAINABLE AGRI LIVELIHOOD PROJECT (REHAB & EXPANSION OF GOAT & POULTRY MULTIPLIER FARM LIVELIHOOD & DISPERSAL PROJECT) 1,000,000.00 1,000,000.00 SUSTAINABLE AGRI LIVELIHOOD PROJECT (REHAB & EXPANSION OF SWINE & ARTIFICIAL INSEMINATION BREEDING CENTER & LIVELIHOOD DISPERSAL) 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION (SNAPPER (LAYA) & PRODUCTION IN GROUPER (LAPU-LAPU) FISH CAGES) 1,000,000.00 1,000,000.00 SUSTAINABLE AGRI LIVELIHOOD PROJECT (RAIN SHELTER PROJECTS) 500,000.00 500,000.00 SUSTAINABLE AGRI LIVELIHOOD PROJECT CORRAL (PAUGMAD) PROJECT) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS MARINE PROTECTED AREAS (ESTABLISHMENT OF DIMALUNA, TABID & SINUZA MARINE PROTECTED AREA) 600,000.00 600,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 CAPACITY BUILDING FOR CSO 500,000.00 500,000.00 RICE TRADING FOR PORTERS 500,000.00 500,000.00 REHAB/REPAIR DAY CARE CENTER (ECCD) RESOURCE CENTER CLUSTER 500,000.00 500,000.00 WOMAN CRISES CENTER 1,500,000.00 1,500,000.00 YAMAN PINOY COCO-SUGAR PRODUCTION 700,000.00 700,000.00 UPGRADING SEAWEEDS PROCESSING PROJECT 700,000.00 700,000.00 LOCAL ECONOMIC DEVELOPMENT PROJECT 1,000,000.00 1,000,000.00 VARIOUS LGSF PROJECTS 4,540,000.00 4,540,000.00 BAADERO LAM-AN TO TINAGO CORE ROAD - RECONSTRUCTION OF MOLICAY0LABO ROAD (OLD SPANISH ROAD) - TIPAN ACCESS ROAD LEADING TO IDENTIFIED TOURISM SPOT- COBRA FALLS - TABID ACCESS ROAD LEADING TO FISHING VILLAGE & MPA 1,000,000.00 1,000,000.00 MALAUBANG ACCESS ROAD LEADING TO URBAN POOR AREA 700,000.00 700,000.00 CATADMAN-MANABAY BANGKAL ACCESS ROAD 1,000,000.00 1,000,000.00 CALABAYAN ACCESS ROAD LEADING TO VERMI SHED & MPDP PROJECT 1,000,000.00 1,000,000.00 1313 PANAON - - - - 1,500,000.00 - - - - 5,000,000.00 863,250.00 - - 2,000,000.00 9,363,250.00 CONSTRUCTION OF WATER SYSTEM (LEVEL II) 1,500,000.00 1,500,000.00 CONSTRUCTION OF DRAINAGE CANAL 5,000,000.00 5,000,000.00 SKILLS & INDUSTRY-FOCUSED TRAINING CUM PRODUCTION DEVELOPMENT & MARKETING "COCONUT SUGAR PRODUCTION" 863,250.00 863,250.00 INTEGRATED COMMUNITY FOOD PRODUCTION (NATIVE CHICKEN PRODUCTION) 2,000,000.00 2,000,000.00 1314 PLARIDEL 2,700,000.00 - - - 4,500,000.00 - - 2,200,000.00 1,000,000.00 - - - - 700,000.00 11,100,000.00 FARM IMPLEMENTS 1,200,000.00 1,200,000.00 MINI RICE MILL 1,000,000.00 1,000,000.00 RICE-DUCK CULTURE 500,000.00 500,000.00 CONSTRUCTION OF DEBOLOC-TIPOLO FOOTBRIDGE 1,500,000.00 1,500,000.00 REHABILITATION OF PLARIDEL (OLD) WATER SYSTEM 3,000,000.00 3,000,000.00 SWINE FATTENING 500,000.00 500,000.00 COCO-SUGAR PRODUCTION 1,200,000.00 1,200,000.00 DOLE KABUHAYAN PROGRAM 500,000.00 500,000.00 PASALUBONG CENTER 1,000,000.00 1,000,000.00 GRAVELLING OF PUROK 3-PUROK 4 ROAD, NEWCARTEGANA 700,000.00 700,000.00 1315 SAPANG DALAGA 500,000.00 - - - - - - - - - - - - 12,000,000.00 12,500,000.00 BOTTOM SET GILLNETS 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 8,000,000.00 8,000,000.00 LOCUS TO DISOY ROAD CONCRETING - LOCUS TO NAPILAN ROAD CONCRETING - MASUBONG TO L. BAUTISTA ROAD CONCRETING - SINAAD ROAD CONCRETING - SALIMPUNO TO CAPUNDAG ROAD CONCRETING - DASA ROAD CONCRETING 2,000,000.00 2,000,000.00 MACABIBO ROAD CONCRETING 2,000,000.00 2,000,000.00 1316 SINACABAN - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 CONCRETING OF CORE LOCAL ROAD AT PUROK 3 TO PUROK 6 7,500,000.00 7,500,000.00 CONCRETING OF CORE LOCAL ROAD AT PUROK 6 5,000,000.00 5,000,000.00 1317 TANGUB CITY 13,487,498.00 - 812,500.00 - 800,001.00 - - - - - 1,400,001.00 - - - 16,500,000.00 VARIOUS BFAR PROJECTS 10,487,498.00 10,487,498.00 ESTABLISHMENT OF FISH IN CAGES TECHNO-DEMO PROJECT - IMPROVEMENT OF FISHPORTS - IMPROVEMENT OF FISH SANCTUARIES - ESTABLISHMENT OF FOOD TERMINAL 2,000,000.00 2,000,000.00 IMPROVEMENT OF MARINE PROTECTED AREA 1,000,000.00 1,000,000.00 MANGROVE REHABILITATION /ENHANCEMENT PROJECT 812,500.00 812,500.00 CAPABILITY BUILDING FOR FISHERFOLKS 800,001.00 800,001.00 LIVELIHOOD CAPABILITY BUILDING PROGRAM 1,400,001.00 1,400,001.00 1318 TUDELA 1,100,000.00 - - - 7,200,000.00 - 500,000.00 1,013,000.00 - 500,000.00 - - 536,200.00 1,650,800.00 12,500,000.00 INFRA SUPPORT TO FISHERY PRODUCTION (ACQUISITION OF MOTORIZED FISHING BOATS) 600,000.00 600,000.00 FARM IMPLEMENTS & TOOLS 500,000.00 500,000.00 FOOTBRIDGE 500,000.00 500,000.00 CONSTRUCTION OF FLOOD CONTROL 700,000.00 700,000.00 CONCRETE DRAINAGE CANAL-MUNICIPAL HALL GROUNDS 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL III WATER SYSTEM 5,000,000.00 5,000,000.00 HEALTH EMERGENCY MNGT TRAINING: BASIC EMERGENCY OBSTETRICAL & NEONATAL CARE (BEMONC) FOR MIDWIVES; RABIES ELIMINATION; TB CONTROL; STI/HIV/AIDS PREVENTION; HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 STARTER KITS FOR MANICURE/ PEDICURE, HAIR CULTURE, FOOT SPA, BODY SCRUB & DRESS MAKING (TRAINING KITS) 500,000.00 500,000.00 GOAT RAISING PROJECT (MULTIPLIER) 513,000.00 513,000.00 UPGRADING OF SENIOR CITIZENS DAY CARE CENTER 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 824,595.00 824,595.00 CONCRETING ACCESS ROAD 826,205.00 826,205.00 COMMUNITY BASED SKILLS TRAINING ON WELDING, CARPENTRY, MASONRY, PLUMBING,& TIRE RECAPPING 536,200.00 536,200.00 MISAMIS ORIENTAL 62,264,460.00 - 715,000.00 11,780,000.00 150,734,140.00 - 10,516,400.00 15,050,000.00 1,000,000.00 23,035,000.00 500,000.00 - 6,200,000.00 92,165,000.00 373,960,000.00 1319 ALUBIJID 3,400,000.00 - - - 9,100,000.00 - - - - - - - - - 12,500,000.00 INFRA SUPPORT TO FISHERY PRODUCTION 500,000.00 500,000.00 SUSTAINABLE AGRI LIVELIHOOD PROJECT 900,000.00 900,000.00 SUSTAINABLE FISHERY BASED LIVELIHOOD PROJECT 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION PROJECT 1,500,000.00 1,500,000.00 INTEGRATION OF WATERWORKS SYSTEM 9,100,000.00 9,100,000.00 1320 BALINGASAG 3,175,000.00 - - 380,000.00 13,945,000.00 - - - - - - - - 4,000,000.00 21,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CATTLE & CARABAO LIVELIHOOD DISPERSAL PROGRAM 1,975,000.00 1,975,000.00 BANGUS DEBONING LIVELIHOOD PROJECT 1,200,000.00 1,200,000.00 GULAYAN SA PAARALAN 380,000.00 380,000.00 VARIOUS DILG PROJECTS 11,288,572.92 11,288,572.92 CONCRETING OF QUEZON BARANGAY ROAD - CONCRETING OF KIBALOS-SAN ISIDRO BARANGAY ROAD - CONSTRUCTION OF ARAAY-LANTAD SPILLWAY - CONSTRUCTION OF LINED CANAL ALONG MALVAR ST. - BRGY 1 - CONSTRUCTION OF LINED CANAL ALONG REGALADO ST. - BRGY 2 - CONSTRUCTION OF LINED CANAL ALONG MADROO ST. - BRGY 4 - CONSTRUCTION OF LINED CANAL ALONG MADROO ST. - BRGY 5 - REHABILITATION OF WATER SYSTEM - LEVEL II 2,656,427.08 2,656,427.08 CONCRETING OF SAN FRANCISCO BARANGAY ROAD 2,000,000.00 2,000,000.00 CONCRETING OF CALAWAG BARANGAY ROAD 2,000,000.00 2,000,000.00 1321 BALINGOAN 1,000,000.00 - - - 8,000,000.00 - - - - - - - - 3,500,000.00 12,500,000.00 SUSTAINABLE AGRI-FISHERY BUSINESS INVESTMENT 1,000,000.00 1,000,000.00 EVACUATION FACILITY 7,500,000.00 7,500,000.00 CAPABILITY BUILDING FOR CSOS 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION (ACCESS ROAD) 3,500,000.00 3,500,000.00 1322 BINUANGAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 FLOOD CONTROL 12,500,000.00 12,500,000.00 1323 CAGAYAN DE ORO CITY 12,865,000.00 - 715,000.00 - 10,480,000.00 - - 1,750,000.00 - 3,435,000.00 - - - 715,000.00 29,960,000.00 VARIOUS DA PROJECTS 12,865,000.00 12,865,000.00 ACQUISITION OF POST HARVEST FACILITIES & EQUIPMENT - CLUSTERED COMMUNITY BASED VEGETABLE PRODUCTION - COMMUNITY-BASED LIVESTOCK PRODUCTION - BOAR-STUD ARTIFICIAL INSEMINATION CENTER - LIVESTOCK AUCTION MARKET - ORGANIC FERTILIZER PRODUCTION & COMPOSTING FACILITY - SUSTAINABLE ENVIRONMENTAL PROTECTION PROGRAM W/ LIVELIHOOD COMPONENT 715,000.00 715,000.00 EVACUATION CENTER 7,140,000.00 7,140,000.00 BOTTLE FOR LIFE: A SAFEGUARD KIT TO SURVIVE PROJECT 830,000.00 830,000.00 WATER SYSTEM 360,000.00 360,000.00 REPAIR & IMPROVEMENT OF WATER SYSTEM 360,000.00 360,000.00 REPAIR & IMPROVEMENT OF WATER SYSTEM 360,000.00 360,000.00 REHABILITATION OF WATER SYSTEM 1,430,000.00 1,430,000.00 VARIOUS DOLE PROJECTS 1,750,000.00 1,750,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR THE INFORMAL SECTOR- MOTORELA DRIVERS & OPERATORS OF THE CITY OF CAGAYAN DE ORO - COMMUNITY BASED TECHNICAL SERVICES MANAGEMENT & LIVELIHOOD PROGRAM - VARIOUS DSWD PROJECTS 3,435,000.00 3,435,000.00 ESTABLISHMENT OF REHABILITATION/DEVELOPMENTAL CENTER FOR CHILDREN W/ SPECIAL NEEDS IN CAGAYAN DE ORO CITY - CONSTRUCTION OF WOMEN CRISIS CENTER - SUPPORT FOR SHELTERED VOCATIONAL WORKSHOP OF PERSONS W/ DISABILITIES IN CAGAYAN DE ORO CITY - ACCESS & ROAD REPAIR 715,000.00 715,000.00 1324 CLAVERIA 500,000.00 - - 500,000.00 4,000,000.00 - 1,500,000.00 - - 1,000,000.00 - - 500,000.00 7,500,000.00 15,500,000.00 PROVISION OF MACHINERIES & EQUIPMENT IN SUPPORT TO LIVESTOCK PRODUCTION 500,000.00 500,000.00 CONTINUING BASIC EDUCATION FOR IP'S 500,000.00 500,000.00 EXPANSION OF CLAVERIA WATER SYSTEM 3,000,000.00 3,000,000.00 IMPROVEMENT OF MAT-I WATERWORKS & SANITATION 1,000,000.00 1,000,000.00 PURCHASE OF COMPACT DRUG 500,000.00 500,000.00 UPGRADING OF RHU 1,000,000.00 1,000,000.00 UPGRADING OF DAY CARE CENTERS 500,000.00 500,000.00 ECCD LEARNING MATERIALS OF THE DAY CARE CENTERS 500,000.00 500,000.00 MIGBANDAY FARM TO MARKET ROAD 7,500,000.00 7,500,000.00 TECHNOLOGY-BASE COMMUNITY TRAINING 500,000.00 500,000.00 1325 EL SALVADOR CITY 4,200,000.00 - - 1,500,000.00 - - - - - - - - - 6,800,000.00 12,500,000.00 SUSTAINABLE AGRI LIVELIHOOD PROJECT 2,000,000.00 2,000,000.00 INFRA SUPPORT TO AGRI & FISHERY PRODUCTION 800,000.00 800,000.00 INFRA SUPPORT TO AGRI & FISHERY PRODUCTION 400,000.00 400,000.00 INFRA SUPPORT TO AGRI & FISHERY PRODUCTION 1,000,000.00 1,000,000.00 REPAIR OF SCHOOL CLASSROOMS FOR 15 BARANGAYS 1,500,000.00 1,500,000.00 CONCRETING OF KALABAYLABAY-SAN FRANCISCO DE ASIS LOCAL ACCESS ROAD 6,800,000.00 6,800,000.00 1326 GINGOOG CITY 6,110,000.00 - - 3,100,000.00 5,663,600.00 - 2,976,400.00 2,000,000.00 - - - - 2,200,000.00 7,950,000.00 30,000,000.00 COFFEE PRODUCTION 500,000.00 500,000.00 CONSTRUCTION OF SIP 750,000.00 750,000.00 PROVISION OF MOTORIZED BANCA 510,000.00 510,000.00 MPDP PROJECT 600,000.00 600,000.00 PRODUCTION OF AQUA SILVI SPECIES 600,000.00 600,000.00 IMPROVISION OF AQUA-SILVI PROJECT 900,000.00 900,000.00 FISH CAGE 750,000.00 750,000.00 SUSTAINABLE AGRI-BASED LIVELIHOOD 1,500,000.00 1,500,000.00 REPAIR & REHAB OF CLASSROOMS 3,100,000.00 3,100,000.00 VARIOUS DILG PROJECTS 3,163,600.00 3,163,600.00 CONST. OF FOOTBRIDGE - FLOOD CONTROL INFRASTRUCTURES - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF RIVER CONTROL PROJECT - CONST. OF POTABLE WATER SYSTEM - LEVEL II 2,500,000.00 2,500,000.00 INFECTIOUS DISEASES ELIMINATION 658,500.00 658,500.00 INTEGRATED HEALTH TRAININGS FOR GRASSROOTS PROJECTS 817,900.00 817,900.00 INTENSIVE ADVOCACY CAMPAIGN ON THE PREVENTION OF STI/HIV/AIDS 500,000.00 500,000.00 REP.IMP. OF BRGY. HEALTH STATIONS 1,000,000.00 1,000,000.00 RICE TRADING 1,000,000.00 1,000,000.00 FOOD PROCESSING OF VARIOUS PRODUCTS 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 3,600,000.00 3,600,000.00 ROAD IMPROVEMENT 4,350,000.00 4,350,000.00 COMMUNITY BASED TRAININGS 1,000,000.00 1,000,000.00 TECHNOLOGY BASED SKILLS TRAININGS ON CONSTRUCTION TRADES 1,200,000.00 1,200,000.00 1327 GITAGUM 614,460.00 - - 1,000,000.00 2,785,540.00 - 2,100,000.00 - - - - - - 6,000,000.00 12,500,000.00 MARINE RESERVED & FISH SANCTUARIES 614,460.00 614,460.00 SCHOOL BUILDING REPAIR 500,000.00 500,000.00 SCHOOL FURNITURE 500,000.00 500,000.00 IMPROVEMENT/REHAB/EXPANSION/UPGRADING/ OF WATER SUPPLY SYSTEM - PHASE 3 2,785,540.00 2,785,540.00 COMPLETION OF RENOVATION/REPAIR & EXPANSION OF GITAGUM MUNICIPAL HEALTH CENTER & LYING-IN CLINIC 2,100,000.00 2,100,000.00 VARIOUS LGSF PROJECTS 1,600,000.00 1,600,000.00 ROAD REHAB/CONCRETING IN BARANGAY TALA-O - ROAD/REHAB/CONCRETING IN BARANGAY QUEZON - ROAD/REHAB/CONCRETING IN BARANGAY COGON - ROAD/REHAB/CONCRETING IN BARANGAY KILANGIT 1,200,000.00 1,200,000.00 ROAD/REHAB/CONCRETING IN SITIO BAGUIO, BURNAY 1,200,000.00 1,200,000.00 ROAD/REHAB/CONCRETING IN POBLACION 2,000,000.00 2,000,000.00 1328 INITAO 9,500,000.00 - - - - - - - - - - - - 3,000,000.00 12,500,000.00 PURCHASE OF FARM TRACTOR 2,000,000.00 2,000,000.00 PURCHASE OF MOTORIZED FISHING BOATS & FISHING NETS 600,000.00 600,000.00 CONSTRUCTION OF FISH PORT 4,900,000.00 4,900,000.00 PURCHASE OF SEEDS & OTHER PLANTING MATERIALS 1,000,000.00 1,000,000.00 ESTABLISHMENT OF ORGANIC FERTILIZER & PRODUCTION FACILITY 1,000,000.00 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 3,000,000.00 3,000,000.00 1329 JASAAN - - - - 10,000,000.00 - 500,000.00 - - 2,000,000.00 - - - - 12,500,000.00 VARIOUS DILG PROJECTS 8,000,000.00 8,000,000.00 CONSTRUCTION OF INTAKE BOX & PIPELINES SYSTEM - CONSTRUCTION OF 1.5 X 100M FOOTBRIDGE IN SAN ISIDRO- SOLANA - CONSTRUCTION OF 1.5 X 100M FOOTBRIDGE IN SAN NICOLAS - COONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 MATERNAL, NEONATAL, CHILD HEALTH & NUTRITION (MNCHN) 500,000.00 500,000.00 SEA KAUNLARAN ASSOCIATION (SKA) 2,000,000.00 2,000,000.00 1330 KINOGUITAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF SEAWALL 5,000,000.00 5,000,000.00 WATER SYSTEM IMPROVEMENT 7,500,000.00 7,500,000.00 1331 LAGONGLONG 7,500,000.00 - - - - - - - - - - - - 5,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 7,500,000.00 7,500,000.00 BANGSI PUMP BEAT WITH DRIED PRODUCTION - TUNNEL VENT POULTRY HOUSE (BROILER) - ORGANIC FERTILIZER PLANT - SOWPRODUCTION - CONCRETING OF ACCESS ROAD 5,000,000.00 5,000,000.00 1332 LAGUINDINGAN - - - - - - - - - - - - - 12,500,000.00 12,500,000.00 VARIOUS LGSF PROJECTS 8,500,000.00 8,500,000.00 IMPROVEMENT /REHABILITATION/ CONCRETING OF ACCESS ROAD (JUNCTION AROMAHON PROVINCIAL ROAD BOUND TO TRANSPORT TERMINAL LEADING TO JUNCTION POBLACION NATIONAL HIGHWAY) - IMPROVEMENT/REHABILITATION/CONCRETING OF LIBERTY ELEMENTARY SCHOOL BARANGAY ROAD - IMPROVEMENT/REHABILITATION/CONCRETING OF SITIO APUT BARANGAY SINAI ROAD - IMPROVEMENT/REHABILITATION/CONCRETING OF GASI ELEMENTARY SCHOOL BARANGAY ROAD - IMPROVEMENT/REHABILITATION/CONCRETING OF PORTION URBAN PROPER OF BARANGAY MOOG ROAD (PUROK 1 TO MOOG ROMAN CATHOLIC CHURCH) 2,000,000.00 2,000,000.00 IMPROVEMENT/REHABILITATION/CONCRETING OF MAIN ROAD ALONG PHASE II RELOCATION LOCATED AT TUBAJON 2,000,000.00 2,000,000.00 1333 LIBERTAD 2,500,000.00 - - - 1,010,000.00 - 2,940,000.00 - - 2,500,000.00 - - 1,000,000.00 2,550,000.00 12,500,000.00 SUSTAINABLE AGRI-LIVELIHOOD PROJECT 1,000,000.00 1,000,000.00 MARINE RESERVE & FISH SANCTUARIES 1,000,000.00 1,000,000.00 MARINE PROTECTED AREAS (MANGROVE AREAS) 500,000.00 500,000.00 VARIOUS DILG PROJECTS 1,010,000.00 1,010,000.00 CONSTRUCTION OF FOOT BRIDGE - REHABILITATION OF EXISTING FOOT BRIDGE - CONSTRUCTION OF CONCRETE OPEN CANAL/DRAINAGE - COMMUNITY HEALTH TEAM MOBILIZATION 810,000.00 810,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,130,000.00 1,130,000.00 MATERNAL, NEONATAL, CHILD HEALTH & NUTRITION (MNCHN) 1,000,000.00 1,000,000.00 INTEGRATED LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 CORE SHELTER ASSISTANCE PROGRAM 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - CAPABILITY BUILDING 500,000.00 500,000.00 CONCRETING OF ACCESS ROAD 2,550,000.00 2,550,000.00 TECHNICAL/VOCATIONAL SKILLS TRAINING 1,000,000.00 1,000,000.00 1334 LUGAIT - - - - 3,000,000.00 - - - - - - - - 9,500,000.00 12,500,000.00 FLOOD CONTROL 3,000,000.00 3,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS LOCAL ROAD CONSTRUCTION/REHABILITATION 7,500,000.00 7,500,000.00 LOCAL ROAD CONSTRUCTION/REHABILITATION 2,000,000.00 2,000,000.00 1335 MAGSAYSAY 1,000,000.00 - - 1,000,000.00 7,500,000.00 - 500,000.00 - - 1,500,000.00 - - 1,000,000.00 - 12,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 REPAIR/ REHABILITATION OF CLASSROOM 500,000.00 500,000.00 REPAIR/ REHABILITATION OF CLASSROOM 500,000.00 500,000.00 PROVISION OF POTABLE WATER SYSTEM 7,500,000.00 7,500,000.00 STRENGTHENING DISEASES FREE ZONE 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PORGRAM 1,000,000.00 1,000,000.00 PROTECTIVE SERVICE (CAPACITY BUILDING) 500,000.00 500,000.00 COMMUNITY-BASED SKILLS TRAINING 1,000,000.00 1,000,000.00 1336 MANTICAO - - - - 6,750,000.00 - - - - - - - - 5,750,000.00 12,500,000.00 WATER SYSTEM (SALINTUBIG) 6,750,000.00 6,750,000.00 ROAD CONCRETING 5,750,000.00 5,750,000.00 1337 MEDINA - - - 500,000.00 6,000,000.00 - - - 1,000,000.00 3,000,000.00 - - - 2,000,000.00 12,500,000.00 PROPOSE REPAIR/REHABILITATION OF ADMIN. OFFICE/H.E. BLDG. 500,000.00 500,000.00 PROPOSE CONSTRUCTION REHABILITATION OF PERMANENT BRIDGE 1,000,000.00 1,000,000.00 PROPOSE CONSTRUCTION/ REHABILITATION OF DRAINAGE SYSTEM 2,000,000.00 2,000,000.00 PROPOSE ESTABLISHMENT OF WATER SYSTEM 1,000,000.00 1,000,000.00 PROPOSE ESTABLISHMENT/REHABILITATION OF WATER SYSTEM 1,000,000.00 1,000,000.00 PROPOSE ESTABLISHMENT/REHABILITATION OF WATER SYSTEM 1,000,000.00 1,000,000.00 PROPOSE CONST./ ESTABLISHMENT OF INFORMATION & PASALUBONG CENTER 1,000,000.00 1,000,000.00 PROPOSE CONSTRUCTION OF MULTI PURPOSE BLDG. (EVACUATION CENTER) 3,000,000.00 3,000,000.00 VARIOUS LGSF PROJECTS 2,000,000.00 2,000,000.00 PROPOSE CONCRETE PAVEMENT OF ACCESS ROAD - PROPOSE CONCRETE PAVEMENT OF ACCESS ROAD - PROPOSE CONCRETE PAVEMENT OF ACCESS ROAD - PROPOSE CONCRETE PAVEMENT OF ACCESS ROAD - PROPOSE CONCRETE PAVEMENT OF ACCESS ROAD - 1338 NAAWAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 LGU WATER SYSTEM DEVELOPMENT: NAAWAN LEVEL II WATER SUPPLY AUGMENTATION 12,500,000.00 12,500,000.00 1339 OPOL 2,200,000.00 - - 2,300,000.00 - - - - - 7,500,000.00 500,000.00 - - - 12,500,000.00 MULTI PURPOSE DRYING PAVEMENT 700,000.00 700,000.00 DRAFT ANIMALS (CARABAO) W/ FARM IMPLEMENTS 1,000,000.00 1,000,000.00 FINGERLINGS/SEED STOCKS PRODUCTION 500,000.00 500,000.00 REPAIR/REHAB OF 8 CLASSROOMS IN 8 SCHOOLS 2,300,000.00 2,300,000.00 CONSTRUCTION OF EVACUATION CENTER 2015 7,500,000.00 7,500,000.00 ONE TOWN ONE PRODUCT/ ONE BARANGAY ONE PRODUCT 500,000.00 500,000.00 1340 SALAY - - - - - - - - - 1,600,000.00 - - - 10,900,000.00 12,500,000.00 ESTABLISHMENT OF OPDA 700,000.00 700,000.00 REPAIR/UPGRADING OF DCC 900,000.00 900,000.00 VARIOUS LGSF PROJECTS 6,027,550.00 6,027,550.00 CONCRETING OF ALIPUATON ROAD SECTION - CONCRETING OF GUINALABAN-MATAMPA ROAD SECTION - SWINE PRODUCTION 872,450.00 872,450.00 CONCRETING OF TINAGAAN-BUNAL ROAD SECTION 4,000,000.00 4,000,000.00 1341 SUGBONGCOGON 4,000,000.00 - - - - - - 7,500,000.00 - - - - - 1,000,000.00 12,500,000.00 CASSAVA PRODUCTION 1,000,000.00 1,000,000.00 HONEY BEE PRODUCTION 500,000.00 500,000.00 ASSISTANCE TO FISHERFOLKS FOR A BETTER FISH CATCH 1,300,000.00 1,300,000.00 ABACA PRODUCTION 700,000.00 700,000.00 HIGH VALUE CROPS PRODUCTION (TOMATO & BULB ONION) 500,000.00 500,000.00 HOG FATTENING 7,000,000.00 7,000,000.00 CONSTRUCTION OF RAIN SHELTER & CUTFLOWER PRODUCTION 500,000.00 500,000.00 CONCRETING OF 439METERS OF PUROK 4, POBLACION & PUROK 5, POBLACION, SUGBONGCOGON ACCESS ROAD 1,000,000.00 1,000,000.00 1342 TAGOLOAN 1,700,000.00 - - 1,500,000.00 7,000,000.00 - - 3,800,000.00 - 500,000.00 - - - - 14,500,000.00 GULAYAN SA ZONA /PUROK LEVEL 500,000.00 500,000.00 FARM EQUIPMENTS (ELF HAULER & HAND TRACTOR) 1,200,000.00 1,200,000.00 BASIC EDUCATION FACILITIES 1,000,000.00 1,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIGAN LAHAT (SALINTUBIG) PROVISSON OF POTABLE WATER SUPPLY 7,000,000.00 7,000,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): WORKERS INCOME AUGMENTATION PROGRAM (WIN AP) -WOMEN 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DLIP): TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKERS (TUPAD) 500,000.00 500,000.00 DOLE-AMP (DOLE-ADJUSTMENT MEASURES PROGRAM) 2,800,000.00 2,800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)- MICROENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 1343 TALISAYAN - - - - 10,500,000.00 - - - - - - - 500,000.00 1,500,000.00 12,500,000.00 VARIOUS DILG PROJECTS 10,500,000.00 10,500,000.00 CONSTRUCTION OF STANDARD EVACUATION CENTER - CONSTRUCTION OF STANDARD EVACUATION CENTER - CONSTRUCTION OF STANDARD EVACUATION CENTER - CONSTRUCTION OF SEAWALL - CONSTRUCTION OF ACCESS ROAD 1,500,000.00 1,500,000.00 TECHNICAL/VOCATIONALTRAINING & EMPLOYMENT / COMMUNITY- BASED 500,000.00 500,000.00 1344 VILLANUEVA 2,000,000.00 - - - 7,500,000.00 - - - - - - - 1,000,000.00 2,000,000.00 12,500,000.00 LIVELIHOOD SUPPORT-FISHERY DEVELOPMENT 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 7,500,000.00 7,500,000.00 SOLIGAO TUBURAN 2 CREEK - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS UPPER DAYAWAN-TUBIGAN CREEK - AMLEY, DAYAWAN-TAG-ANGA CREEK - BANBAN-LOWER NANGKA ONE LANE ROAD 2,000,000.00 2,000,000.00 PRODUCTION SKILLS TRAINING & DEVELOPMENT 1,000,000.00 1,000,000.00 REGION XI 150,927,025.93 2,657,500.00 20,893,341.05 33,368,125.00 261,976,435.98 - 53,089,750.00 49,195,854.04 3,004,000.00 90,354,012.50 15,125,000.00 21,650,000.00 9,470,000.00 41,788,955.50 753,500,000.00 COMPOSTELA VALLEY 26,352,382.48 1,657,500.00 6,431,500.00 7,949,125.00 63,513,217.52 - 18,423,750.00 6,320,612.50 1,500,000.00 13,356,912.50 1,525,000.00 4,000,000.00 3,470,000.00 6,000,000.00 160,500,000.00 1345 COMPOSTELA - - - - 13,500,000.00 - - - - - - - - - 13,500,000.00 VARIOUS DILG PROJECTS 13,500,000.00 13,500,000.00 UPGRADING OF POTABLE WATER SYSTEM FROM LEVEL 2 TO 3 - BAGONGON - UPGRADING OF POTABLE WATER SYSTEM FROM LEVEL 2 TO 3 - MAPARAT - UPGRADING OF POTABLE WATER SYSTEM FROM LEVEL 2 TO 3 - NEWALEGRIA - UPGRADING OF POTABLE WATER SYSTEM FROM LEVEL 2 TO 3 - OSMEA - UPGRADING OF POTABLE WATER SYSTEM FROM LEVEL 2 TO 3 - PANANSALAN - 1346 LAAK (SAN VICENTE) 4,500,000.00 - 3,000,000.00 500,000.00 8,500,000.00 - 2,000,000.00 - - - - 4,000,000.00 - 3,000,000.00 25,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,500,000.00 1,500,000.00 FRUIT TREE SEEDLING DISPERSAL 500,000.00 500,000.00 RUBBER SEEDLING DISPERSAL PROGRAM 1,000,000.00 1,000,000.00 TRAIDING POST (BAGSAKAN AND AUCTION CENTER) 1,500,000.00 1,500,000.00 NGP- CACAO SEEDLING PROGRAM 1,000,000.00 1,000,000.00 NGP - RUBBER SEEDLING PROGRAM (BUDDED SEEDLINGS) 2,000,000.00 2,000,000.00 GULAYAN SA PAARALAN (VEGETABLE SEEDS AND FARM HAND TOOLS) FOR 50 SCHOOLS 500,000.00 500,000.00 CONSTRUCTION OF PWS LEVEL II 1,500,000.00 1,500,000.00 CONSTRUCTION OF PWS LEVEL II 500,000.00 500,000.00 EXPANSION OF PWS LEVEL II 500,000.00 500,000.00 COMPLETION OF PWS LEVEL II 500,000.00 500,000.00 EXPANSION OF PWS LEVEL II 500,000.00 500,000.00 CONSTRUCTION OF PWS LEVEL II 1,500,000.00 1,500,000.00 EXPANSION OF PWS LEVEL II 500,000.00 500,000.00 EXPANSION OF PWS LEVEL II 500,000.00 500,000.00 EXPANSION OF PWS LEVEL II 500,000.00 500,000.00 CONSTRUCTION OF 3.0 KMS DRAINAGE CANALS 2,000,000.00 2,000,000.00 HIRING OF REGISTERED NURSE AND MIDWIVES TO AUGMENT RU/MHO/BHS PERSONNEL 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION: GRAVELLING OF LAAK- TAWINIAN-INAKAYAN ROAD (3KMS) 3,000,000.00 3,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 4,000,000.00 4,000,000.00 1347 MABINI 500,000.00 - - - 6,010,000.00 - 4,490,000.00 - - 500,000.00 1,000,000.00 - - - 12,500,000.00 ESTABLISHMENT OF MARINE PROTECTED AREA 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 2,010,000.00 2,010,000.00 IMPROVEMENT OF BAJADA WATER SYSTEM LEVEL II 500,000.00 500,000.00 POTABLE WATER SYSTEM LEVEL III 2,500,000.00 2,500,000.00 IMPROVEMENT OF CUAMBOG POTABLE WATER SYSTEM- LEVEL III 1,000,000.00 1,000,000.00 COMPLETION AND UPGRADING MHC SAFE BIRTHING FACILITY 2,000,000.00 2,000,000.00 CONSTRUCTION OF HEALTH STATION 1,000,000.00 1,000,000.00 HIRING OF MIDWIVES 990,000.00 990,000.00 SKILLS TRAINING OF BNS 500,000.00 500,000.00 REPAIR AND REHAB OF PINDASAN CROSSING DAY CARE CENTER 500,000.00 500,000.00 YAMAN PINOY LIVELIHOOD PROJECT (PEOPLE WITH DISABILITIES, SOLO PARENT, OSY) 1,000,000.00 1,000,000.00 1348 MACO 500,000.00 - - - 5,900,000.00 - 4,000,000.00 1,200,000.00 - 1,900,000.00 - - - - 13,500,000.00 ACQUISITION OF MOTORIZED BOAT AND DRIFT GILL NET 500,000.00 500,000.00 FLOOD CONTROL PROJECT 1,000,000.00 1,000,000.00 REHABILITATION OF MUNICIPAL WATER SYSTEM (PHASE II) 4,900,000.00 4,900,000.00 ACQUISITION OF MEDICAL EQUIPMENT 2,000,000.00 2,000,000.00 IMPROVEMENT OF INFIRMARY 2,000,000.00 2,000,000.00 LIVELIHOOD PROGRAM 1,200,000.00 1,200,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF OVERFLOWBRIDGE 1,400,000.00 1,400,000.00 1349 MARAGUSAN (SAN MARIANO) - - - - 5,000,000.00 - - 2,000,000.00 1,500,000.00 - - - 1,000,000.00 3,000,000.00 12,500,000.00 VARIOUS DILG PROJECTS 5,000,000.00 5,000,000.00 CONSTRUCTION OF GABIONS/RETAINING WALLS AT TARAGO AND TIPNASAN - CONSTRUCTION OF DRAINAGE CANALS - LIVELIHOOD ASSISTANCE 2,000,000.00 2,000,000.00 COMMUNITY-BASED TOURISM DEVELOPMENT 1,500,000.00 1,500,000.00 CORE LOCAL ROAD CONSTRUCTION (ROADS/STREETS IN POBLACION AREA) 3,000,000.00 3,000,000.00 TECHNICAL SKILLS TRAINING( PLUMBING, BUILDING AND ELECTRICAL WIRING, SMALL ENGINE REPAIR, FOOD PROCESSING, BREAD AND PASTRIES, CELLPHONE REPAIR) 1,000,000.00 1,000,000.00 1350 MAWAB - - - 5,013,725.00 - - 1,593,750.00 570,612.50 - 4,421,912.50 - - 900,000.00 - 12,500,000.00 REPAIR / REHABILITATION OF 50 UNITS CLASSROOMS 5,013,725.00 5,013,725.00 MNCHN RESPONSIBLE PARENTHOOD 1,593,750.00 1,593,750.00 VARIOUS DOLE PROJECTS 570,612.50 570,612.50 EMERGENCY EMPLOYMENT - LIVELIHOOD STARTER KIT - SUSTAINABLE LIVELIHOOD PROGRAM (SEA-K) - PROVISION OF SEED CAPITAL 2,805,000.00 2,805,000.00 TRAINING FOR SELF EMPLOYMENT (CASH FOR TRAINING PROJECT) - MANICURE, PEDICURE, HAIR DRESSING AND FOOD PROCESSING 916,300.00 916,300.00 REPAIR AND UPGRADING OF 21 DAY CARE CENTERS 700,612.50 700,612.50 SKILLS TRAINING ON WELDING 900,000.00 900,000.00 1351 MONKAYO 5,049,000.00 1,657,500.00 1,000,000.00 533,500.00 2,650,000.00 - 3,850,000.00 700,000.00 - 3,535,000.00 525,000.00 - - - 19,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENT OF 10 UNITS AGRICULTURAL TRADING POST 3,500,000.00 3,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,549,000.00 1,549,000.00 IRRIGATION PROJECT - CONCRETING OF IRRIGATION CANAL FOR RUFCIA 555,625.00 555,625.00 IRRIGATION PROJECT - CONCRETING OF IRRIGATION CANAL FOR PUROK 2A FARMERS IRRIGATORS ASSOCIATION 555,625.00 555,625.00 IRRIGATION PROJECT - CONCRETING OF IRRIGATION CANAL FOR SUGOD-UNION RICE FARMERS ASSOCIATION (SURFA) 546,250.00 546,250.00 NATIONAL GREENING PROGRAM TO BE IMPLEMENTED BY 4PS, INDIGENOUS PEOPLES GROUP AND OTHER CSOS 1,000,000.00 1,000,000.00 REPAIR/ REHABILITATION OF CLASSROOM (FOR SPECIAL CHILDREN WITH EXCEPTIONALITIES ) AND PROVISION OF FACILITIES / SCHOOL FURNITURES 533,500.00 533,500.00 SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY (LEVEL II) 2,125,000.00 2,125,000.00 CAPACITY BUILDING PROGRAM FOR CIVIL SOCIETY ORGANIZATION (CSOS) - SKILLS TRAINING, LIVELIHOOD TRAINING, CONDUCT OF CSO QUARTERLY ASSEMBLY MARKETING LINKAGE 525,000.00 525,000.00 HFEP - CONSTRUCTION OF 1 BHS 750,000.00 750,000.00 HFEP - RENOVATION OF 5 BHS 2,500,000.00 2,500,000.00 MATERNAL, NEONATAL CHILD HEALTH AND NUTRITION PROGRAM 600,000.00 600,000.00 DOLE-INTEGRATED LIVELIHOOD PROGRAM (DILP); TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGE WORKERS AND FARMERS (BANANA/ VEGETABLE FARMERS AND OSY) 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICROENTERPRISE DEVELOPMENT TRACK (SMALL BUSINESS ENTERPRISE AT THE GRASSROOTS LEVEL (BARANGAY)) 500,000.00 500,000.00 VARIOUS DSWD PROJECTS 3,035,000.00 3,035,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER - CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE FACILITIES - CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE FACILITIES - CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE FACILITIES - CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE FACILITIES - CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE FACILITIES - YAMAN PINOY PROGRAM: (A)CAPACITY BUILDING PROGRAM ON SKILLS, INDUSTRY FOCUS, ENTREPRENEURIAL ASPECTS; (B)PRODUCT DEVELOPMENT AND MARKETING ON SKILLS TRAINING FOR COOPS AND OTHER MICRO-ORGANIZATION ENGAGED IN SMALL BUSINESS AT THE GRASSROOTS LEVEL (BARANGAY) 525,000.00 525,000.00 1352 MONTEVISTA 5,439,500.00 - 2,431,500.00 595,000.00 1,674,000.00 - - 1,350,000.00 - - - - 1,010,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 2,919,500.00 2,919,500.00 LIVESTOCK PRODUCTION (SWINE, GOATS AND DUCKS) - ORGANIC FERTILIZER PRODUCTION - CONSTRUCTION OF SMALL IRRIGATION PROJECT 1,350,000.00 1,350,000.00 POST HARVEST FACILITIES (2 UNITS MULTI PURPOSE PAVEMENT (SOLAR DRYER)) 1,170,000.00 1,170,000.00 NATIONAL GREENING PROGRAM 2,431,500.00 2,431,500.00 BASIC EDUCATIONAL FACILITIES: REPAIR OF 3 CLASSROOM 595,000.00 595,000.00 RESCUE EQUIPMENT 504,000.00 504,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT PROGRAM (SALINTUBIG) (LEVEL II PWS CONSTRUCTED) 1,170,000.00 1,170,000.00 LIVELIHOOD ASSISTANCE FOR WAGE WORKER'S IN RELATION OF AND OTHER INFORMAL SECTOR 1,350,000.00 1,350,000.00 TECHNICAL-VOCATIONAL COMMUNITY-BASED TRAINING PROGRAM (TRAINING COURSES FOR MOTOR CYCLE REPAIR AND AUTOMOTIVE MECHANIC WITH A MINIMUM OF 25 GRADUATES PER COURSE AND TO BE PROVIDED WITH THEIR CORRESPONDING STARTER KIT AFTER TRAINING) 510,000.00 510,000.00 TECHNICAL VOCATIONAL SCHOLARSHIP PROGRAM (20 SCHOLARS GRADUATED FOR SLAUGHTERING NC II (BUTCHERY) AND 20 SCHOLARS GRADUATED FOR SHIELDED METAL ARC WELDING (SMAW) NC II FROM POOR BUT DESERVING FAMILY MEMBERS WHO ARE OUT OF SCHOOL YOUTH 500,000.00 500,000.00 1353 NABUNTURAN 4,663,882.48 - - 1,306,900.00 3,479,217.52 - 1,490,000.00 - - 1,000,000.00 - - 560,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 4,663,882.48 4,663,882.48 DAIRY GOAT PROJECT WITH POT - CACAO PRODUCTION WITH POT - CACAO FERMENTATION FACILITY AND SOLAR DRYER - COFFEE PRODUCTION WITH POT - REPAIR/REHABILITATION OF 4 CLASSROOMS 600,000.00 600,000.00 PROVISION OF SCHOOLS ARMCHAIRS OF THE KINDERGARTEN 706,900.00 706,900.00 CONSTRUCTION/REHABILITATION OF MAJOR CANALS AND RIVERS 3,479,217.52 3,479,217.52 PURCHASE OF ANTI-RABIES VACCINE 600,000.00 600,000.00 PURCHASE OF ULTRASOUND UNIT 890,000.00 890,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - CAPACITY BUILDING 1,000,000.00 1,000,000.00 CAPACITY BUILDING (SKILLS TRAINING FOR CARPENTRY, MASONRY, UPHOLSTERY, COSMETOLOGY FOR OSY, MASSAGE, FOOD PROCESSING, BEAUTY CARE) 560,000.00 560,000.00 1354 NEWBATAAN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 RIVER FLOOD CONTROL 12,500,000.00 12,500,000.00 1355 PANTUKAN 5,700,000.00 - - - 4,300,000.00 - 1,000,000.00 500,000.00 - 2,000,000.00 - - - - 13,500,000.00 VARIOUS BFAR PROJECTS 5,700,000.00 5,700,000.00 ESTABLISHMENT OF FISH LANDING/PORT - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ACQUISITION OF MOTORIZED FISHING BOATS - ESTABLISHMENT OF FISH CAGE - CONSTRUCTION OF WATER SYSTEM LEVEL II 2,300,000.00 2,300,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL II 2,000,000.00 2,000,000.00 PURCHASE OF MEDICINES 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM - NEGOSYO SA KARITON 500,000.00 500,000.00 CONSTRUCTION OF CRISIS INTERVENTION CENTER FOR WOMEN AND CHILDREN 1,000,000.00 1,000,000.00 CONSTRUCTION OF ELDERLY DAY CENTER 1,000,000.00 1,000,000.00 DAVAO DEL NORTE 33,992,000.00 - 3,000,000.00 5,700,000.00 55,241,400.00 - 9,516,000.00 15,359,000.00 504,000.00 10,800,000.00 5,600,000.00 9,700,000.00 500,000.00 12,587,600.00 162,500,000.00 1356 ASUNCION (SAUG) 2,509,000.00 - - 2,500,000.00 6,948,000.00 - - 1,043,000.00 - 1,500,000.00 - - - - 14,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - ORGANIC FERTILIZER PRODUCTION AND PROMOTION OF ORGANIC FARMING 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO ENTERPRISE DEVELOPMENT - RAISING NATIVE POULTRY RAISING 500,000.00 500,000.00 HOG RAISING AND POULTRY PRODUCTION 500,000.00 500,000.00 HOG RAISING AND POULTRY 509,000.00 509,000.00 REPAIR OF SPED CLASSROOM (CEILING, WINDOWS, DOOR, LAVATORY) AND REWIRING 406,260.00 406,260.00 3 CLASSROOM ELEVETION AND GENERAL REPAIR 830,200.00 830,200.00 GENERAL REPAIR OF 2 CLASSROOMS ROOF AND CEILING 456,005.00 456,005.00 2 CLASSROOM ELEVATION AND GENERAL REPAIR 807,535.00 807,535.00 VARIOUS DILG PROJECTS 5,448,000.00 5,448,000.00 TWO-STOREY EVACUATION BUILDING - SMALL DRAINAGE CANAL - FLOOD RELIEF CHANNEL - PROCUREMENT OF RESCUE EQUIPMENT - REHABILITATION OF MAGATOS RURAL WATER SYSTEM 1,500,000.00 1,500,000.00 PROVISION OF EQUIPMENT ON VERMI CULTURE AND ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 PROVISION OF EQUIPMENTS ON VERMI CULTURE AND ORGANIC FERTILIZER PRODUCTION 543,000.00 543,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR DCC'S AND SUPERVISED NEIGHBORHOOD PLAY GROUPS 500,000.00 500,000.00 CONSTRUCTION OF GROUP HAND WASHING FACILITY IN DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND FLORIDE GEL TOOTHPASTE) 500,000.00 500,000.00 PROVISION OF HYGIENE KIT/MATERIALS IN DAY CARE CENTERS/ SNP SITED 500,000.00 500,000.00 1357 BRAULIO E. DUJALI 1,000,000.00 - - 500,000.00 8,000,000.00 - 2,000,000.00 500,000.00 - 500,000.00 - - - - 12,500,000.00 TILAPIA PRODUCTION 1,000,000.00 1,000,000.00 REHABILITATION OF 3-CLASSROOM SCHOOL BUILDING 500,000.00 500,000.00 PROCUREMENT OF RESCUE EQUIPMENT 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 7,000,000.00 7,000,000.00 EXPANSION OF EVACUATION CENTER - FLOOD CONTROL PROGRAM (REHABILITATION OF MAG CREEK) - PURCHASED OF MEDICINES, SUPPLIES AND INSTRUMENTS 500,000.00 500,000.00 UPGRADING 3 BARANGAY HEALTH STATION 1,500,000.00 1,500,000.00 PROCUREMENT OF BARBERING SET, VULCANIZING TOOLS AND SUPPLIES AND EQUIPMENTS FOR CANDLE MAKING 500,000.00 500,000.00 REHABILITATION OF 5 DAY CARE CENTER 500,000.00 500,000.00 1358 CARMEN 2,500,000.00 - - - 4,000,000.00 - - - - 500,000.00 500,000.00 - 500,000.00 4,500,000.00 12,500,000.00 INTEGRATED FISHCULTURE, EGG PRODUCTION AND ORGANC FERTILIZER PRODUCTION 500,000.00 500,000.00 LIVELIHOOD- LUMAD INTEGRATED FARMING (MUSHROOM AND TILAPIA PRODUCTION) 500,000.00 500,000.00 LIVELIHOOD PROGRAMS/ PROJECTS: CATFISH HATCHERY 500,000.00 500,000.00 COLD STORAGE/VAN 1,000,000.00 1,000,000.00 EXPANSION OF LEVEL II POTABLE WATER SYSTEM 4,000,000.00 4,000,000.00 DRESSMAKING: LIVELIHOOD FOR WOMEN SECTOR 500,000.00 500,000.00 YAMAN PINOY - FISH PROCESSING CENTER FOR LAMAYO 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 4,500,000.00 4,500,000.00 PUROK 1 TO 6 BRGY ISING CORE LOCAL ROAD CONSTRUCTION - CONSTRUCTION OF PUROK 3 ISING TO PUROK 4A TUGANAY CORE LOCAL ROAD - SKILLS TRAINING ON WELDING 500,000.00 500,000.00 1359 CITY OF PANABO 2,500,000.00 - 1,000,000.00 2,200,000.00 4,200,000.00 - 500,000.00 1,000,000.00 - 3,600,000.00 - - - 1,500,000.00 16,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS VIZ: BANANA PROCESSING; CACAO PROCESSING; BANGUS PROCESSING; HITO AND TILAPIA PRODUCTION 1,700,000.00 1,700,000.00 INFRA-SUPPORT TO AGRI AND FISHERY PRODUCTION : MOTORIZED FISHING BOAT 800,000.00 800,000.00 NGP: URBAN GREENING PROJECT AND ENVIRONMENTAL PROTECTION ADVOCACY 500,000.00 500,000.00 MANGROVE PLANTING 500,000.00 500,000.00 BASIC EDUC. FACILITIES: REHABILITATION OF SCHOOL CLASSROOMS 1,700,000.00 1,700,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM 500,000.00 500,000.00 SALINTUBIG 4,200,000.00 4,200,000.00 PROCUREMENT OF MEDICAL EQUIPMENTS: BP APPARATUS WITH STAND, MICROTOISE, CHOLESTEROL METER 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROJECTS 9DILP0: SUSTAINABLE LIVELIHOOD ASSISTANCE AND ENTREPRENEURSHIP TRAINING PROGRAM 1,000,000.00 1,000,000.00 CONSTRUCTION OF CRISIS CENTER FOR WOMEN 1,500,000.00 1,500,000.00 CONSTRUCTION OF REHABILITATION CENTER FOR CHILDREN IN CICL 1,500,000.00 1,500,000.00 RENOVATION OF ANGEL BARACHAEL HOME FOR BOYS 600,000.00 600,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CORE LOCAL ROAD CONSTRUCTION 1,500,000.00 1,500,000.00 1360 ISLAND GARDEN CITY OF SAMAL 7,350,000.00 - 1,000,000.00 - 4,574,000.00 - 1,336,000.00 - - 3,000,000.00 740,000.00 2,500,000.00 - - 20,500,000.00 BARANGAY UPLAND VEGETABLE PRODUCTION 1,500,000.00 1,500,000.00 GREEN HOUSE VEGETABLE PRODUCTION 1,000,000.00 1,000,000.00 HOG RAISING PROJECT 2,050,000.00 2,050,000.00 FISH CAPTURE WITH FISHING BOAT (310 FISH TRAPS "BOBO", 310 UNITS OF MULTIPLE HANDLINE, 31 UNITS NON-MOTORIZED BANCA, 31 UNITS MOTORIZED FISHING BOAT) 800,000.00 800,000.00 MPA/FISH SANCTUARY MANAGEMENT 2,000,000.00 2,000,000.00 RIVERBANK REHABILITATION 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 PROVISION OF POTABLE WATER SUPPLY 2,000,000.00 2,000,000.00 WATER SYSTEM REHABILITATION 2,574,000.00 2,574,000.00 MATERNAL, NEONATAL, CHILD HEALTH NUTRITION (MNCHN); TB CONTROL; DENGUE CONTROL; STI/HIV AND AIDS PREVENTION 812,000.00 812,000.00 RABIES ELIMINATION 524,000.00 524,000.00 CORE SHELTER ASSISTANCE 3,000,000.00 3,000,000.00 YAMAN PINOY (PRODUCT AND HUMAN RESOURCE DEVELOPMENT) 740,000.00 740,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,250,000.00 1,250,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,250,000.00 1,250,000.00 1361 KAPALONG 1,900,000.00 - 1,000,000.00 500,000.00 3,400,000.00 - 2,700,000.00 - - - - 3,000,000.00 - - 12,500,000.00 NATIVE CHICKEN PRODUCTION 1,400,000.00 1,400,000.00 SWEET POTATO PRODUCTION 500,000.00 500,000.00 NGP - REFORESTATION 1,000,000.00 1,000,000.00 CLASSROOM REPAIR 500,000.00 500,000.00 VARIOUS DILG PROJECTS 3,400,000.00 3,400,000.00 PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - HEALTH FACILITIES ENHANCEMENT 900,000.00 900,000.00 HEALTH FACILITIES ENHANCEMENT 900,000.00 900,000.00 HEALTH FACILITIES ENHANCEMENT 900,000.00 900,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 3,000,000.00 3,000,000.00 1362 NEWCORELLA 7,000,000.00 - - - 3,500,000.00 - 1,000,000.00 1,000,000.00 - - - - - - 12,500,000.00 AGRO-FORESTRY (EXPANSION OF RUBBER PRODUCTION) 3,500,000.00 3,500,000.00 VARIOUS NIA PROJECTS 3,500,000.00 3,500,000.00 REHABILITATION OF SMALL IRRIGATION SYSTEM - CONCRETING OF IRRIGATION CANAL LINING - CONCRETING OF IRRIGATION CANAL LINING - CONSTRUCTION/REHABILITATION OF DRAINAGE CANAL 2,900,000.00 2,900,000.00 CONSTRUCTION/REHABILITATION OF DRAINAGE CANAL 600,000.00 600,000.00 UPGRADING OF BARANGAY HEALTH STATION 500,000.00 500,000.00 UPGRADING OF BARANGAY HEALTH STATION 500,000.00 500,000.00 LIVELIHOOD PROJECTS 1,000,000.00 1,000,000.00 1363 SAN ISIDRO 513,000.00 - - - 5,119,400.00 - 1,080,000.00 - - - - 4,200,000.00 - 1,587,600.00 12,500,000.00 RUBBER PRODUCTION 513,000.00 513,000.00 VARIOUS DILG PROJECTS 5,119,400.00 5,119,400.00 SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY LEVEL III - SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY LEVEL III - SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY LEVEL II - SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY LEVEL II - SALINTUBIG - PROVISION OF POTABLE WATER SUPPLY LEVEL II - CONSTRUCTION OF WATER RESERVOIR - CONSTRUCTION OF WATER RESERVOIR - CONSTRUCTION OF HALFWAY HOUSE 1,080,000.00 1,080,000.00 REHABILITATION OF 3.0 KMS CORE LOCAL ROAD 522,000.00 522,000.00 REHABILITATION OF 3.0 KMS CORE LOCAL ROAD 522,000.00 522,000.00 REHABILITATION OF 3.0 KMS CORE LOCAL ROAD 543,600.00 543,600.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,250,000.00 1,250,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,200,000.00 1,200,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,750,000.00 1,750,000.00 1364 SANTO TOMAS - - - - 7,500,000.00 - - - - - - - - 5,000,000.00 12,500,000.00 VARIOUS DILG PROJECTS 6,300,000.00 6,300,000.00 CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF DRAINAGE CANALS - CONSTRUCTION OF LEVEL II WATER SYSTEM 1,200,000.00 1,200,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM WITH ROAD COMPONENT 2,000,000.00 2,000,000.00 CORE LOCAL ROAD CONSTRUCTION 3,000,000.00 3,000,000.00 1365 TAGUM CITY 7,720,000.00 - - - 2,000,000.00 - - 10,016,000.00 504,000.00 800,000.00 2,460,000.00 - - - 23,500,000.00 VARIOUS DA PROJECTS 5,320,000.00 5,320,000.00 NATIVE LIVESTOCK AND POULTRY RAISING PRODUCTION FOR MUSLIM COMMUNITY - FISHERIES PROJECT - MUD CRAB CULTURE AND FATTENING - HIGH VALUE CROPS PROJECT - COCONUT FIBER MATERIALS TRAINING AND PRODUCTION - HIGH VALUE CROPS PROJECTS - VEGETABLE PRODUCTION SUPPORT AND PROVISION OF IRRIGATION EQUIPMENT - RICE PRODUCTION PROJECT - PROVISIONS OF RICE PRODUCTION MACHINERIES AND SUPPORT - POULTRY AND LIVESTOCK RAISING (CABER AND NATIVE VARIETY AND GOAT PRODUCTION AND HOG RAISING) - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES (PEANUT BUTTER MAKING, QUAIL EGG PRODUCTION, MUSHROOM PRODUCTION AND VEGETABLE PRODUCTION) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI FISHERY BUSINESS INVESTMENT (FISHERIES PROJECT - BUNSOD PAHUBAS, PAYAWAND BUNSOD PALAWUM, TALABA CULTURE) 2,400,000.00 2,400,000.00 RESCUE EQUIPMENT 2,000,000.00 2,000,000.00 OFWREINTEGRATION PROGRAM AND LIVELIHOOD 800,000.00 800,000.00 LIVELIHOOD ASSISTANCE FOR FISHERFOLKS - PROVISION OF MATERIALS AND EQUIPMENT AND FISH VENDING 640,000.00 640,000.00 LIVELIHOOD ASSISTANCE FOR MUSLIMS - HALAL MEATSHOP 800,000.00 800,000.00 LIVELIHOOD ASSISTANCE FOR WIVES OF CONSTRUCTION WORKERS - BREAD AND PASTRY PRODUCTION AND COMMERCIAL COOKING TRAINING CUM PRODUCTION 800,000.00 800,000.00 LIVELIHOOD ASSISTANCE FOR INDIGENOUS PEOPLE - BIAIS (TRIBAL WINE), DAGUM (TRIBAL DRESS) MAKING, BEADWORKS AND PIANAIYAN (CROSS STICHING) 800,000.00 800,000.00 LIVELIHOOD ASSISTANCE FOR FISHERFOLKS - CONSTRUCTION OF FLOATING COTTAGES 640,000.00 640,000.00 LIVELIHOOD ASSISTANCE FOR URBAN POOR - BIGASAN 800,000.00 800,000.00 LIVELIHOOD ASSISTANCE FOR WOMEN - FROZEN KITCHEN GOODIES 800,000.00 800,000.00 LIVELIHOOD ASSISTANCE FOR FISHLANDING LABORER'S - MERCHANDISING AND BANYERA RENTALS INCLUDING SKILLS TRAINING FOR MEMBERS AND IMMEDIATE FAMILY 800,000.00 800,000.00 NEGOKART FOR FRUITS AND VEGATABLES 1,040,000.00 1,040,000.00 LIVELIHOOD ASSISTANCE FOR BHW- DRESSMAKING TRAINING CUM PRODUCTION 560,000.00 560,000.00 DIGITAL T-SHIRT PRINTING 520,000.00 520,000.00 VCO AND COCO SUGAR MAKING 504,000.00 504,000.00 FOOD CART BANANA DIP 512,000.00 512,000.00 TOURISM SUPPORT FACILITIES FOR FISHERFOLKS (TRAINING AND VARIOUS ACTIVITIES BEFORE THE CONSTRUCTION OF FLOATING COTTAGES) 504,000.00 504,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICRO ENTERPRISE 800,000.00 800,000.00 YAMAN PINOY 500,000.00 500,000.00 PRODUCTIVITY ENHANCEMENT AND ENTREPRENEURIAL DEVELOPMENT OF TAGUM CITY PROCESSOR AND NIGHT MARKET VENDORS OF TAGUM CITY 960,000.00 960,000.00 OTOP STORE (TRIBAL DISPLAY CENTER) 500,000.00 500,000.00 CAPABILITY BUILDING 500,000.00 500,000.00 1366 TALAINGOD 1,000,000.00 - - - 6,000,000.00 - 900,000.00 1,800,000.00 - 900,000.00 1,900,000.00 - - - 12,500,000.00 ABACA PRODUCTION 500,000.00 500,000.00 CONSTRUCTION OF MULTI PURPOSE SOLAR DRIER 500,000.00 500,000.00 POTABLE WATER SYSTEM (LEVEL II) 6,000,000.00 6,000,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM - CONSTRUCTION OF HEALTH STATION 900,000.00 900,000.00 GREENWORKS AND JOB THROUGH EMERGENCY EMPLOYMENT 1,800,000.00 1,800,000.00 VARIOUS DSWD PROJECTS 900,000.00 900,000.00 CONSTRUCTION OF 3 UNITS DAY CARE CENTER - CONSTRUCTION/ IMPROVEMENT OF WOMEN CRISIS CENTER - INDUSTRY CLUSTERING DEVELOPMENT PROGRAM - RUBBER, COFFEE AND CACAO 1,900,000.00 1,900,000.00 DAVAO DEL SUR 49,700,643.45 1,000,000.00 6,473,841.05 14,599,000.00 95,483,060.00 - 12,350,000.00 14,945,000.00 - 41,447,100.00 1,700,000.00 1,000,000.00 4,500,000.00 19,301,355.50 262,500,000.00 1367 BANSALAN 2,360,000.00 - - 1,190,000.00 4,377,500.00 - - 3,000,000.00 - 1,572,500.00 - - - - 12,500,000.00 PROVISION OF COCONUT DRYERS AND MULTI PURPOSE DRYING PAVEMENT 850,000.00 850,000.00 ORGANIC FERTILIZER PRODUCTION 510,000.00 510,000.00 ORGANIC BANANA/CACAO PRODUCTION 1,000,000.00 1,000,000.00 REHABILITATION OF 4 UNITS SCHOOL CLASSROOMS 1,020,000.00 1,020,000.00 GULAYAN SA PAARALAN 170,000.00 170,000.00 VARIOUS DILG PROJECTS 4,377,500.00 4,377,500.00 CONSTRUCTION OF GROUTED RIPRAP DIKE PROTECTION DIKE - PROVISION OF POTABLE WATER SUPPLY - EMERGENCY EMPLOYMENT - GROUTED RIPRAP DIKE AT MIRAL RIVER FOR FLOOD CONTROL 2,000,000.00 2,000,000.00 SUPPORT TO JOB PLACEMENT SERVICES/TULONG PANGHANAPBUHAY PARA SA ATING DISADVANTAGE WORKERS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR 4PS BENEFICIARIES 722,500.00 722,500.00 IMPROVEMENT OF BAHAY PAG-ASA FOR CICL 850,000.00 850,000.00 1368 DAVAO CITY 16,256,500.00 - 3,215,000.00 700,000.00 500,000.00 - 2,500,000.00 1,860,000.00 - 3,968,500.00 - - 1,000,000.00 - 30,000,000.00 VARIOUS DA PROJECTS 14,506,500.00 14,506,500.00 HVCP - FRUITS AND INDUSTRIAL CROPS PROJECT - HVCP - ORGANIC VEGETABLES/SEEDS PROJECT - ORGANIC RICE/SEED PRODUCTION PROJECT - ORGANIC CORN/SEEDS PRODUCTION PROJECT - GOAT RESTOCKING PROJECT - VARIOUS BFAR PROJECTS 1,750,000.00 1,750,000.00 FRMP - FISHERY PROJECT - FISHERY RESOURCE CONSERVATION PROJECT - STRENGTHENING OF FISHERY LAWENFORCEMENT - VARIOUS DENR PROJECT 3,215,000.00 3,215,000.00 RIVERBANK REHABILITATION PROJECT FOR FLOOD PRONE BARANGAYS - AGRO FORESTRY IN TOP LANDSLIDE PRONE AREAS IN UPSTREAM BARANGAYS - GULAYAN SA PAARALAN 700,000.00 700,000.00 CAPABILITY BUILDING FOR CIVIL SOCIETY ORGANIZATIONS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CAPABILITY BUILDING FOR DOCTORS, NURSES, MIDWIVES, PPOS AND PPWS 1,000,000.00 1,000,000.00 COMMUNITY HEALTH TEAMS MOBILIZATION IN POOR BARANGAYS IN GIDA 500,000.00 500,000.00 PROCUREMENT OF FAMILY PLANNING COMMODITIES FOR THE POOR BARANGAYS IN GIDA 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - PROVISION OF SKILLS TRAINING (COMMUNITY-BASED) AND STARTER KITS 1,860,000.00 1,860,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - PROVISION OF CAPABILITY BUILDING AND MICRO ENTERPRISE DEVELOPMENT 1,637,000.00 1,637,000.00 PROVISION OF ECCD PACKAGES TO DAY CARE CENTERS AND HOME- BASED ECCD PROGRAM 500,000.00 500,000.00 VARIOUS DSWD PROJECTS 1,831,500.00 1,831,500.00 CAPABILITY BUILDING ON POSITIVE LIFE SKILLS AND PROTECTIVE BEHAVIOR TO CHILDREN IN NEED OF SPECIAL PROTECTION (CNSP) AND CHILDREN IN RISK (CAR) - CAPABILITY BUILDING FOR DAY CARE WORKERS AND SUPERVISED NEIGHBORHOOD PLAY WORKERS - CAPABILITY BUILDING OF EPES PARENT VOLUNTEERS - CAPABILITY BUILDING FOR SERVICE PROVIDERS - SUSTAINABLE LIVELIHOOD PROGRAM - PROVISION OF SKILLS TRAINING/COMMUNITY-BASED (REMOVE SLP) 1,000,000.00 1,000,000.00 1369 DIGOS CITY 4,400,000.00 - - 3,574,000.00 2,776,000.00 - 1,150,000.00 1,800,000.00 - 2,000,000.00 - - 1,000,000.00 800,000.00 17,500,000.00 CACAO AND COFFEE PRODUCTION 800,000.00 800,000.00 CATTLE AND SWINE RESTOCKING 2,000,000.00 2,000,000.00 INFRASUPPORT TO AGRICULTURE ABD FISHERY PRODUCTION AND DEVELOPMENT 800,000.00 800,000.00 ORGANIC FERTILIZER PRODUCTION (VERMICAST) 800,000.00 800,000.00 REPAIR/REHAB OF 17 UNITS CLASSROOM 2,700,000.00 2,700,000.00 GULAYAN SA PAARALAN 344,000.00 344,000.00 INNOVATIVE EDUCATION PROGRAM/PROVISION OF ADM OF 7 SCHOOLS FOR 78 LEARNERS OF ALS AND PURCHASE OF ALS MODULES 530,000.00 530,000.00 EVACUATION CENTER AND FACILITIES 1,176,000.00 1,176,000.00 SALINTUBIG - PROVISION OF POTABLE WATER (LEVEL 3) FOR 2 IDENTIFIED BARANGAYS 1,600,000.00 1,600,000.00 PROVISION OF MEDICAL EQUIPMENTS/SUPPLIES 1,150,000.00 1,150,000.00 LIVELIHOOD ASSISTANCE FOR TODA 1,800,000.00 1,800,000.00 LIVELIHOOD ASSISTANCE PROGRAM FOR DISADVANTAGE WOMEN 2,000,000.00 2,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (MUSHROOM PRODUCTION) 800,000.00 800,000.00 TECH-VOC TRAINING FOR OUT OF SCHOOLS YOUTHS 1,000,000.00 1,000,000.00 1370 DON MARCELINO 1,429,340.00 - - 900,000.00 6,970,660.00 - 1,200,000.00 500,000.00 - 3,700,000.00 - - - 2,800,000.00 17,500,000.00 PROVISION OF FARM TOOLS AND EQUIPMENTS 500,000.00 500,000.00 PURCHASE OF FISH SHELTER AND MOTORIZED FISHING BOAT 929,340.00 929,340.00 REPAIR/ REHABILITATION OF 9 UNIT CLASSROOMS 900,000.00 900,000.00 FLOOD CONTROL 1,500,000.00 1,500,000.00 CONSTRUCTION OF FOOTBRIDGE 594,160.00 594,160.00 VARIOUS DILG PROJECTS 4,876,500.00 4,876,500.00 PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - PROVISION OF POTABLE WATER SUPPLY - HEALTH FACILITIES ENHANCEMENT (CONSTRUCTION OF BHS) 1,200,000.00 1,200,000.00 EMERGENCY EMPLOYMENT FOR THE CONSTRUCTION OF GABIONS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - MICROENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 3,200,000.00 3,200,000.00 CORE LOCAL ROAD CONSTRUCTION 2,800,000.00 2,800,000.00 1371 HAGONOY 2,500,000.00 - - 1,000,000.00 2,293,900.00 - 800,000.00 - - 3,906,100.00 - - 2,000,000.00 - 12,500,000.00 CATTLE RESTOCKING 1,000,000.00 1,000,000.00 INFRASTRUCTURE SUPPORT TO FISHERY PRODUCTION (PROCUREMENT OF 10 MOTORIZED FISHING BOATS) 500,000.00 500,000.00 INFRASTRUCTURE SUPPORT TO RICE FARMING: HAND TRACTOR WITH TRAILER AND COMPLETE ACCESSORIES; THRESHER WITH ENGINE AND ACCESSSORIES 1,000,000.00 1,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION: RADIO BASED INSTRUCTION 500,000.00 500,000.00 BASIC EDUCATION FACILITIES 500,000.00 500,000.00 UPGRADING PWS 2,293,900.00 2,293,900.00 PURCHASE OF MEDICINES AND EQUIPMENTS TO BARANGAYS 800,000.00 800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: BUY AND SELL OF PALAY AND OTHER AGRICULTURAL PRODUCTS, AGRICULTURAL SUPPLIES AND NFA RICE WHOLE SALE AND RETAIL 1,300,000.00 1,300,000.00 VARIOUS DSWD PROJECTS 2,606,100.00 2,606,100.00 CONSTRUCTION OF 3 DAY CARE CENTER - KALAHI CIDSS- CONSTRUCTION OF INDIGENOUS PEOPLE'S TRIBAL CENTER - SUPPORT TO TECHNICAL SKILLS TRAININGS 2,000,000.00 2,000,000.00 1372 JOSE ABAD SANTOS (TRINIDAD) 2,000,000.00 - - 1,500,000.00 18,000,000.00 - 3,000,000.00 - - 500,000.00 - - - 5,000,000.00 30,000,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT PROVISION OF 40 UNITS MOTORIZED FISHING BANCA AND FISHNETS) 2,000,000.00 2,000,000.00 BASIC EDUCATIONAL FACILITIES: REPAIR/REHABILITATION OF 5 CLASSROOMS 1,000,000.00 1,000,000.00 BASIC EDUCATIONAL FACILITIES: PROVISION OF SCHOOL FURNITURE (714 ARMCHAIRS) 500,000.00 500,000.00 EVACUATION FACILITY 3,000,000.00 3,000,000.00 EVACUATION FACILITY 1,500,000.00 1,500,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 FLOOD CONTROL 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM 1,500,000.00 1,500,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM 2,000,000.00 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,400,000.00 1,400,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 600,000.00 600,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING FOR 70 DAY CARE WORKERS AND PROVISION OF LEARNING MATERIALS FOR 52 DAY 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 2,500,000.00 2,500,000.00 VARIOUS LGSF PROJECTS 2,500,000.00 2,500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION - 1373 KIBLAWAN 4,700,000.00 1,000,000.00 1,000,000.00 - 1,500,000.00 - 2,200,000.00 - - 4,400,000.00 700,000.00 - - - 15,500,000.00 UPLAND IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT/ SOLAR DRYER 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION FACILITY 800,000.00 800,000.00 CACAO SEEDLINGS PRODUCTION 1,000,000.00 1,000,000.00 VEGETABLE PRODUCTION 500,000.00 500,000.00 ORGANIC TILAPIA PRODUCTION AND DEBONING 500,000.00 500,000.00 CATTLE RESTOCKING 900,000.00 900,000.00 RIVERBANK REHABILITATION (KIBLAWAN RIVER) 1,000,000.00 1,000,000.00 POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 CSO CAPABILITY BUILDING 500,000.00 500,000.00 CONSTRUCTION OF HEALTH CENTER 1,700,000.00 1,700,000.00 PROVISION OF MEDICAL EQUIPMENT AND SUPPLIES (BP APPARATUS, ETC.) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (OSY/WOMEN) - ELECTRICAL INSTALLATION AND MAINTENANCE, SHIELDED METAL ARC WELDING (SMAW), CARPENTRY, TSHIRT PRODUCTION AND PRINTING, FOOD PROCESSING AND PRESERVATION 1,000,000.00 1,000,000.00 ACCESS ROAD - PUROK 1, MANUAL, BRGY. SITE, SAN ISIDRO 500,000.00 500,000.00 ACCESS ROAD - GEN. LIM ST. TO BAGUMBAYAN 2,900,000.00 2,900,000.00 YAMAN PINOY 700,000.00 700,000.00 1374 MAGSAYSAY 2,900,000.00 - 770,000.00 1,330,000.00 5,500,000.00 - - - - 1,000,000.00 - - - 1,000,000.00 12,500,000.00 VARIOUS NIA PROJECTS 1,900,000.00 1,900,000.00 REHABILITATION OF IRRIGATION DAM (REPAIR OF 2 UNITS IRRIGATION DAM) - UPLAND PIPE IRRIGATION SYSTEM (CONSTRUCTION OF PIPE IRRIGATION SYSTEM FOR AGROLIVESTOCK AND VEGETABLE PRODUCTION) - MPDP (CONSTRUCTION OF 4 UNITS MULTI-PURPOSE DRIER) 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM (FOREST TREE AND PRODUCTION TREE PLANTATION IN WATERSHED AND RIVERBANKS) 770,000.00 770,000.00 GULAYAN SA PAARALAN (33 SCHOOLS) 330,000.00 330,000.00 REPAIR OF 7 CLASSROOMS 1,000,000.00 1,000,000.00 CONSTRUCTION OF FOOTBRIDGES 2,500,000.00 2,500,000.00 CAPACITY DEVELOPMENT PROGRAM (SKILLS TRAINING AND PROJECT MANAGEMENT TRAINING ON VARIOUS LIVELIHOOD PROJECTS) 500,000.00 500,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL II 2,500,000.00 2,500,000.00 VARIOUS DSWD PROJECTS 1,000,000.00 1,000,000.00 SENIOR CITIZEN AND PWDS BUILDING (CONSTRUCTION OF 1 UNIT SENIOR CITIZEN AND PWDS BUILDING) - DAY CARE CENTERS (REPAIR OF 8 DCC) - CONSTRUCTION OF CORE LOCAL ROAD 1,000,000.00 1,000,000.00 1375 MALALAG - - - 1,000,000.00 3,000,000.00 - - 1,000,000.00 - 4,000,000.00 - 1,000,000.00 - 2,500,000.00 12,500,000.00 ACQUISITION OF KINDERGARTEN CHAIRS (900 CHAIRS) 1,000,000.00 1,000,000.00 POTABLE WATER SUPPLY 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 LIVELIHOOD ASSISTANCE 3,000,000.00 3,000,000.00 REHABILITATION/ IMPROVEMENT OF 15 DAY CARE CENTERS 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONCRETING 2,500,000.00 2,500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,000,000.00 1,000,000.00 1376 MALITA 2,500,000.00 - - - 19,250,000.00 - - 2,250,000.00 - 1,000,000.00 - - - - 25,000,000.00 PURCHASE OF MOTORIZED FISHING BOATS AND GEARS 2,000,000.00 2,000,000.00 GOAT RESTOCKING AND SWINE PRODUCTION 500,000.00 500,000.00 VARIOUS WATER PROJECTS 15,250,000.00 15,250,000.00 CONSTRUCTION OF DEMOLOC LEVEL II PWS - CONSTRUCTION OF LITTLE BAGUIO PWS LEVEL II - CONSTRUCTION OF DATU DANWATA LEVEL II PWS - CONSTRUCTION OF FISHING VILLAGE LEVEL II PWS - EXPANSION OF SANGAY LEVEL II PWS - CONSTRUCTION OF TICULON LEVEL II PWS - UPGRADING OF BOLILA FROM LEVEL II TO LEVEL III - VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF EVACUATION CENTER (WITH TOILET FOR MEN, WOMEN AND PWDS) - PURCHASE OF RESCUE EQUIPMENT - LIVELIHOOD FOR WOMEN (BAG MAKING) 500,000.00 500,000.00 ESTABLISHMENT OF GENERAL MERCHANDISE STORE 1,750,000.00 1,750,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR/UPGRADING OF DAY CARE CENTERS 1,000,000.00 1,000,000.00 1377 MATANAO 1,700,000.00 - - 500,000.00 4,400,000.00 - - - - 2,900,000.00 - - - 3,000,000.00 12,500,000.00 ESTABLISHMENT OF BARANGAY NURSERY 500,000.00 500,000.00 LIVELIHOOD AND SKILLS TRAINING FOR FARMERS 500,000.00 500,000.00 SUSTAINABLE AGRICULTURE PROGRAM 700,000.00 700,000.00 PURCHASE OF SCHOOL CHAIRS 500,000.00 500,000.00 IMPROVEMENT/ COMPLETIOM/ CONSTRUCTION OF POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 IMPROVEMENT/ COMPLETIOM/ CONSTRUCTION OF POTABLE WATER SYSTEM 500,000.00 500,000.00 IMPROVEMENT/ COMPLETIOM/ CONSTRUCTION OF POTABLE WATER SYSTEM 1,400,000.00 1,400,000.00 IMPROVEMENT/ COMPLETIOM/ CONSTRUCTION OF POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 IMPROVEMENT/ COMPLETIOM/ CONSTRUCTION OF POTABLE WATER SYSTEM 500,000.00 500,000.00 VARIOUS DSWD PROJECTS 2,900,000.00 2,900,000.00 CONSTRUCTION OF 2 UNITS DAY CARE CENTER AND REHAB OF 2 UNITS DAY CARE CENTER - CONSTRUCTION/ ESTABLISHMENT OF CRISIS CENTER, BALAY PAG-ASA AND MULTI PURPOSE BUILDING FOR PWD, WOMEN AND SENIOR CITIZEN - CONSTRUCTION/ REHABILITATION OF LOCAL ROADS 3,000,000.00 3,000,000.00 1378 PADADA 3,500,000.00 - 500,000.00 - 3,300,000.00 - 1,000,000.00 - - 2,200,000.00 1,000,000.00 - - 1,000,000.00 12,500,000.00 ORGANIC FERTILIZER PROGRAM 500,000.00 500,000.00 FARM IMPLEMENTS/TOOLS 500,000.00 500,000.00 MARINE RESERVE AND FISH SANCTUARIES 650,000.00 650,000.00 CONSTRUCTION OF FISHPORT 1,850,000.00 1,850,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 VARIOUS DILG PROJECTS 1,300,000.00 1,300,000.00 CONSTRUCTION OF CONCRETE CANAL/DRAINAGE - FLOOD CONTROL: CONSTRUCTION OF SEAWALL - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY 2,000,000.00 2,000,000.00 PURCHASE OF MEDICINES AND EQUIPMENTS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE DEVELOPMENT TRACK (PROVISION OF HIGH SPEED SEWING MACHINE) 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (CONSTRUCTION OF WOMEN CRISIS CENTER) 1,200,000.00 1,200,000.00 YAMAN PINOY: MEAT PROCESSING TRAINING, COCO CRAFTS MAKING AND BEADS PRODUCTION TRAINING AND PRODUCT PACKAGING TRAINING 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION 1,000,000.00 1,000,000.00 1379 SANTA CRUZ 3,154,803.45 - 988,841.05 1,700,000.00 3,995,000.00 - - 2,000,000.00 - - - - - 661,355.50 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD/AGRI-FISHERY INVESTMENTS (BANGUS VALUE ADDED PRODUCT/FISH PROCESSING) 500,000.00 500,000.00 TRADING POST (BANANA TRADING) 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD/ AGRI-FISHERY BUSINESS INVESTMENTS (MARINE FISH CAGE CULTURE) FOR TAGABULI DEBONERS ASSOCIATION (TADEAS) 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD/ AGRI-FISHERY BUSINESS INCESTMENTS (MARINE FISH CAGE CULTURE) FOR TAGABULI HEALTH CONSUMER COOPERATIVE (TAHECO) 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY LIVELIHOOD PROJECT/ AGRI-FISHERY INVESTMENTS (BANGUS VALUE ADDED PRODUCT/ FISH PROCESSING) FOR BATO FISH PROCESSORS ASSOCIATION (BAFIPA) 500,000.00 500,000.00 POST HARVEST FACILITIES AND EQUIPMENTS (COFFEE MILL, PULPING MACHINE AND DRYER) 654,803.45 654,803.45 NATIONAL GREENING PROGRAM 988,841.05 988,841.05 BASIC EDUCATION FACILITIES (REPAIR/ REHABILITATION OF CLASSROOMS) 850,000.00 850,000.00 BASIC EDUCATION FACILITIES (REPAIR/ REHABILITATION OF CLASSROOMS) 850,000.00 850,000.00 EVACUATION FACILITY (MUNICIPAL EVACUATION CENTER) 2,125,000.00 2,125,000.00 SAGANA AT LIGTAS NA TUBIG OR SALINTUBIG (BARANGAY SINORON WATER SYSTEM REHABILITATION AND IMPROVEMENT) 595,000.00 595,000.00 SAGANA AT LIGTAS NA TUBIG OR SALINTUBIG (SINABADAN KA RURAL WATER SYSTEM) 1,275,000.00 1,275,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKER OR TUPAD (BIGASAN-OUTLET BY MUN. BHWFEDERATION) 500,000.00 500,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKER OR TUPAD (PILLOWCASE AND CURTAIN MAKING) 500,000.00 500,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGE WORKER OR TUPAD (PILLOWAND CURTAIN MAKING) 500,000.00 500,000.00 TULONG PANGHANAPBUHAY PARA SA ATING MGA DISADVANTAGED WORKER OR TUPAD (CANDY AND KAKANIN MAKING) 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 661,355.50 661,355.50 CORE LOCAL ROAD (CONCRETING OF CARP ACCESS ROAD) - CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION (CONSTRUCTION OF DRAINAGE) - 1380 SANTA MARIA 1,200,000.00 - - 500,000.00 6,200,000.00 - 500,000.00 - - 5,600,000.00 - - 500,000.00 - 14,500,000.00 PROVISION OF MOTORIZED BANKA, BOUY MARKER AND PAYAW AND CAPABILITY BUILDING ACTIVITY 700,000.00 700,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS TRAINING FOR FOOD PROCESSING, SEED PRODUCTION, ORGANIC FERTILIZER AND FARMING 500,000.00 500,000.00 ACQUISITION OF SCHOOL SEATS/DESKS 500,000.00 500,000.00 VARIOUS DILG PROJECTS 6,200,000.00 6,200,000.00 REPAIR ROADS - CONCRETING - CONSTRUCTION OF 1 UNIT DISASTER EVACUATION CENTER - ACQUISITION OF RESCUE EQUIPMENT - BHWCAPABILITY BUILDING 500,000.00 500,000.00 3-DAY CONTINOUS CAPACITY BUILDING OF 48 DAY CARE WORKERS, 7 SNP WORKERS AND 7 PES WORKERS FOR ITS IMPLEMENTATION WITHIN GUIDELINES AND UPDATES 500,000.00 500,000.00 CONSTRUCTION OF 2 UNITS DAY CARE CENTER 1,600,000.00 1,600,000.00 CONSTRUCTION OF 1 UNIT DROP IN CENTER WITH COMPLETE AMENITIES 1,500,000.00 1,500,000.00 CONSTRUCTION OF DAY CENTER FOR SENIOR CITIZEN 1,000,000.00 1,000,000.00 CASH ASSISTANCE FOR INDIGENT STUDENTS 1,000,000.00 1,000,000.00 SKILLS TRAINING ON FOOD PROCESSING, SEWING AND SKILLS TRAINING FOR COSMETOLOGY, WELDING, MOTOR REPAIR 500,000.00 500,000.00 1381 SARANGANI 1,100,000.00 - - - 6,560,000.00 - - - - 2,300,000.00 - - - 2,540,000.00 12,500,000.00 PAYAWMAKING 600,000.00 600,000.00 PROVISION OF MOTORIZED FISHING BOATS AND FISHNETS 500,000.00 500,000.00 EXPANSION OF POTABLE WATER SYSTEM (LEVEL II SALINTUBIG) 5,000,000.00 5,000,000.00 PROVISION OF POTABLE WATER SYSTEM 1,560,000.00 1,560,000.00 CONSTRUCTION OF 6 DAY CARE CENTERS 2,300,000.00 2,300,000.00 CONSTRUCTION OF ROAD (SINGLE LANE) 2,540,000.00 2,540,000.00 1382 SULOP - - - 705,000.00 6,860,000.00 - - 2,535,000.00 - 2,400,000.00 - - - - 12,500,000.00 REHAB AND REPAIR OF 3 UNIT CLASSROOMS AND ACQUISITION OF 270 SCHOOL SEATS/ARMCHAIRS 705,000.00 705,000.00 CONSTRUCTION OF DRAINAGE CANAL SYSTEM (FLOOD CONTROL) 1,500,000.00 1,500,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM WITH APPROPRIATE WATER TREATMENT SYSTEM 1,160,000.00 1,160,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM WITH APPROPRIATE WATER TREATMENT SYSTEM 1,120,000.00 1,120,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM WITH APPROPRIATE WATER TREATMENT SYSTEM 840,000.00 840,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM WITH APPROPRIATE WATER TREATMENT SYSTEM 2,240,000.00 2,240,000.00 LIVELIHOOD ASSISTANCE FOR THE 10 BRGYS(RETRENCHED WORKERS, LABORERS, OUR OF SCHOOL YOUTH, WOMEN, FARMERS, FISHERFOLKS, OTHER INFORMAL SETTLER SECTORS AND PERSONS WITH DISABILITY) 2,535,000.00 2,535,000.00 CONSTRUCTION OF 3 UNIT DAY CARE CENTERS 2,400,000.00 2,400,000.00 DAVAO ORIENTAL 40,882,000.00 - 4,988,000.00 5,120,000.00 47,738,758.46 - 12,800,000.00 12,571,241.54 1,000,000.00 24,750,000.00 6,300,000.00 6,950,000.00 1,000,000.00 3,900,000.00 168,000,000.00 1383 BAGANGA 1,500,000.00 - - 2,000,000.00 2,000,000.00 - 3,000,000.00 1,000,000.00 - 4,000,000.00 500,000.00 - - 500,000.00 14,500,000.00 VARIOUS DA PROJECTS 1,500,000.00 1,500,000.00 DIVERSIFIED FARMING WITH NATIVE HOGS - ESTABLISHMENT OF TRADING POST - PROVISION OF COLD STORAGE FACILITY - VAN TYPE - REPAIR/REHAB 1,000,000.00 1,000,000.00 PROVISION OF SCHOOL FURNITURE 500,000.00 500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 CONSTRUCTION OF WATER SYSTEM (CABOTONGAN, BRGY. KINABLANGAN) 2,000,000.00 2,000,000.00 CONSTRUCTION OF SAFE BIRTHING FACILITY 2,500,000.00 2,500,000.00 EQUIPPING OF SBF 500,000.00 500,000.00 LIVELIHOOD AND EMERGENCY EMPLOYMENT - ESTABLISHMENT OF WOOD WORKS AND FURNITURE SHOP 500,000.00 500,000.00 LIVELIHOOD AND EMERGENCY EMPLOYMENT - ESTABLISHMENT OF MEAT PROCESSING CENTER 500,000.00 500,000.00 MICRO-FINANCING PROJECT (SLP) 500,000.00 500,000.00 LIVELIHOOD AND EMERGENCY EMPLOYMENT PROJECT 1,000,000.00 1,000,000.00 CONSTRUCTION OF CLASSROOMS 2,500,000.00 2,500,000.00 YAMAN PINOY ON HOT CHILI PROCESSING (ASSISTANCE TO 60 HOT CHILI PLANTERS AND PROCESSORS) 500,000.00 500,000.00 LIVESTOCK SPECIFICALLY ON GOAT AND CHICKEN PRODUCTION 500,000.00 500,000.00 1384 BANAYBANAY 1,600,000.00 - - 1,000,000.00 3,500,000.00 - - 800,000.00 - 3,300,000.00 2,300,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,100,000.00 1,100,000.00 ACQUISITION OF POST - HARVEST FACILITIES FOR CACAO AND COFFEE PROCESSING - ESTABLISHMENT OF 1 UNIT COLD STORAGE - PRE-POST HARVEST FACILITIES OF ORGANIC RICE PRODUCTION WITH VACUUM PACKAGING - PROVISION OF NON-MOTORIZED BANKA WITH COMPLETE FISHING GEARS 500,000.00 500,000.00 REHABILITATION OF HIGH SCHOOL BUILDING 500,000.00 500,000.00 PROVISION OF ARMCHAIRS 500,000.00 500,000.00 PROCUREMENT OF RESCUE EQUIPMENT 1,500,000.00 1,500,000.00 TRAINING (CAPACITY BUILDING) 500,000.00 500,000.00 PROVISION OF LEVEL 2 POTABLE WATER SYSTEM 1,500,000.00 1,500,000.00 LIVELIHOOD ASSISTANCE 800,000.00 800,000.00 SACK MAKING (SUSTAINABLE LIVELIHOOD PROGRAM) 2,000,000.00 2,000,000.00 VARIOUS DSWD PROJECTS 1,300,000.00 1,300,000.00 CONSTRUCTION OF ACCESS ROAD - CONSTRUCTION OF 1 UNIT DAY CARE CENTER - YAMAN PINOY 500,000.00 500,000.00 PRODUCTION OF NATIVE PRODUCTS (INCLUSIVE TRAININGS / SEMINARS) 1,000,000.00 1,000,000.00 CAPABILITY LIVELIHOOD PROGRAM 800,000.00 800,000.00 1385 BOSTON 7,172,000.00 - 858,000.00 120,000.00 2,200,000.00 - - - - 2,150,000.00 - - - - 12,500,000.00 DIVERSIFIED FARMING (CACAO; COFFEE; FRUIT TREES; CASH CROPS) 3,950,000.00 3,950,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS NATIVE POULTRY AND HOG RAISING 772,000.00 772,000.00 MOBILE RICE AND CORN MILL 750,000.00 750,000.00 ORGANIC FERTILIZER, REPELLENT AND VERMI COMPOSTING 500,000.00 500,000.00 MOTORIZED FISHING BOAT AND FISH NETS 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (CORN SEEDS; RICE SEEDS; ASSORTED VEGETABLES) 700,000.00 700,000.00 NATIONAL GREENING PROGRAM (NGP) (MANGROVE; FALCATA; BAMBOO; PHIL. MAHOGANY) 858,000.00 858,000.00 GULAYAN SA PAARALAN 120,000.00 120,000.00 VARIOUS DILG PROJECTS 2,200,000.00 2,200,000.00 CONSTRUCTION OF SAFE EVACUATION CENTER - RESCUE EQUIPMENT - LIVELIHOOD ASSISTANCE FOR IP'S AND 4PS BENEFICIARIES (MICRO ENTERPRISE BIGASAN; SOAP AND FABRIC CONDITIONER MAKING/ PRODUCTION; DISH WASHING LIQUID MAKING/ PRODUCTION; NATIVE CHICKEN PRODUCTION; BEADS AND MANOBO DRESS MAKING; BUY AND SELL OF ASSORTED DRIED FISH) 550,000.00 550,000.00 CONSTRUCTION OF 2 UNITS DAY CARE CENTER 1,600,000.00 1,600,000.00 1386 CARAGA 2,500,000.00 - - - 6,500,000.00 - 500,000.00 1,000,000.00 - - 2,000,000.00 - - - 12,500,000.00 MINI ICE PLANT (5 TONS CAP) 2,500,000.00 2,500,000.00 CAPACITY BUILDING 500,000.00 500,000.00 RESCUE EQUIPMENT 500,000.00 500,000.00 VARIOUS DILG PROJECTS 5,500,000.00 5,500,000.00 WATER SYSTEM - WATER SYSTEM - WATER SYSTEM - WATER SYSTEM - WATER SYSTEM - ENHANCE HEALTH FACILITIES 500,000.00 500,000.00 LIVELIHOOD PROGRAM 1,000,000.00 1,000,000.00 YAMAN PINOY FOR TINAGAK PRODUCTION FROM ABACA 700,000.00 700,000.00 YAMAN PINOY FOR COCO BASED PRODUCTION 700,000.00 700,000.00 STREAMLINING BUSINESS PERMIT AND LICENSING SYTEM 600,000.00 600,000.00 1387 CATEEL 2,920,000.00 - 550,000.00 - 1,580,000.00 - - - - - 500,000.00 6,950,000.00 - - 12,500,000.00 VARIOUS DA PROJECTS 2,920,000.00 2,920,000.00 ORGANIC AGRICULTURE PROGRAM - HIGH VALUE CROPS PRODUCTION - DIVERSIFIED AND SUSTAINABLE AGRICULTURAL LAND TECHNOLOGY (SALT) FARMING - ACQUISITION OF PRE AND POST HARVEST FACILITIES - ESTABLISHMENT OF TRADING POST - NGP: MANGROVE REHABILITATION 550,000.00 550,000.00 POTABLE WATER SUPPLY (PWS LEVEL II) 580,000.00 580,000.00 REHABILITATION OF POTABLE WATER SUPPLY PROJECT 500,000.00 500,000.00 REHABILITATION OF POTABLE WATER SUPPLY PROJECT 500,000.00 500,000.00 YAMAN PINOY: DEVELOPMENT OF VALUE ADDING ENTERPRISE 500,000.00 500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 6,950,000.00 6,950,000.00 1388 CITY OF MATI (CAPITAL) 11,440,000.00 - - - 3,760,000.00 - 6,500,000.00 3,500,000.00 1,000,000.00 2,300,000.00 1,000,000.00 - 500,000.00 - 30,000,000.00 SUSTAINABLE AGRI-BUSINESS ENTERPRISE DEVELOPMENT (CONSTRUCTION OF 1 UNIT GREEN HOUSE, CONSTRUCTION OF 1 UNIT NURSERY, PURCHASED OF PRODUCTION INPUT, OURCHASED OF MATERIALS AND EQUIPMENT) 500,000.00 500,000.00 ACQUISITION OF FISHING BOATS AND FISHING NETS (PURCHASED OF 10 UNITS MOTORIZED BANCA, PURCHASE OF 10 FISHING NETS, 15 FISHERFOLKS TRAINED) 500,000.00 500,000.00 FISH PROCESSING AND MARKETING (CONSTRUCTION OF 1 UNITS PROCESSING CENTER, PURCHASED OF FACILITIES, TRAINED 60 FISHERFOLKS WOMEN) 500,000.00 500,000.00 VARIOUS DA PROJECTS 9,440,000.00 9,440,000.00 COCO OIL PRODUCTION - LOBSTER PRODUCTION - MANGO PROCESSING EQUIPMENT (HOME-BASED) - MINI - ICE PLANT - SMALL FARM RESERVOIR (CONSTRUCTION OF 10 UNIT SMALL FARM RESERVOIR) - CARABAO/ COW/ CATTLE DAIRY PRODUCTION - ESTABLISHMENT OF FISH SANCTUARIES (ESTABLISHMENT OF FISH SANCTUARY, PURCHASED OF BOUY AND SINKER, PURCHASE OF 1 UNIT SERVICE BOAT, PURCHASED EQUIPMENT AND OTHER ACCESSORIES) 500,000.00 500,000.00 VARIOUS DILG PROJECTS 3,260,000.00 3,260,000.00 CONSTRUCTION OF DRAINAGE OF URBAN HOUSING/ RESIDENTIAL AREA - CONSTRUCTION OF EVACUATION CENTER/ FACILITY - REHABILITATION AND REPAIR OF WATER SYSTEM (EXPANSION OF EXISTING WATER LINES AT 3 BARANGAY'S) 500,000.00 500,000.00 CONSTRUCTION OF SAFE BIRTHING FACILITY 2,000,000.00 2,000,000.00 HEALTH/ HOSPITAL EMERGENCY MANAGEMENT 500,000.00 500,000.00 INTEGRATED MANAGEMENT OF MOSQUITO BORNE DISEASES (MALARIS, FILIARIASES AND DENGUE CONTROL) 4,000,000.00 4,000,000.00 BHW'S MINI GROCERIES 500,000.00 500,000.00 TETRA PACK AND SACHET BAG MAKING/ SPECIAL PROGRAM FOR THE EMPLOYMENT OF STUDENTS (SPES)/ COCONET AND BASKET MAKING / DECORATIVE BLOCKS MAKING (MADE FROMRECYCLED MATERIIALS) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD FOR DISPLACED OFWS 1,500,000.00 1,500,000.00 HANDICRAFT MAKING (SUPPORT FOR HOME CRAFTED, BAMBOO CRAFT, CORN HUSK, COCO NOVELTIES AND NITO CRAFT MAKING) 500,000.00 500,000.00 CACAO (TABLEA) PROCESSING AND MARKETING (PRODUCTION OF 1000 KGS DARK CHOCOLATE, CONSTRUCTION 1 UNIT PROCESSING CENTER) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CAPACITY BUILDING FOR TOURISM FRONTLINER 500,000.00 500,000.00 PRESERVATION OF MANDAYA HISTORY ARTS AND CRAFTS THROUGH EXHIBITS AND DISPLAY CENTERS (PRODUCTION OF MANDAYA BROCHURES PRODUCTS AND VARIED MANDAYA ARTS AND CRAFTS FOR 10 MUN. OF DAVOR) 500,000.00 500,000.00 DISHWASHING LIQUID MAKING AND SOAP MAKING 500,000.00 500,000.00 BUY AND SELL OF RICE 500,000.00 500,000.00 PEACE MICRO FINANCE RELENDING SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF 1 UNIT DCC 800,000.00 800,000.00 YAMAN PINOY: TRAINING 500,000.00 500,000.00 YAMAN PINOY: PRODUCT DEVELOPMENT/ MARKETING 500,000.00 500,000.00 NATIONAL CERTIFICATION (NC) COMPETENCY ASSESSMENT 500,000.00 500,000.00 1389 GOVERNOR GENEROSO 5,000,000.00 - 1,000,000.00 - 9,498,758.46 - - 1,001,241.54 - 500,000.00 - - - 500,000.00 17,500,000.00 ORGANIC FERTILIZER PRODUCTION 1,000,000.00 1,000,000.00 PROVISION OF PAYAO AND MOTORIZED BANCA 1,000,000.00 1,000,000.00 PROVISION OF MOTORIZED FISHING BOAT 1,000,000.00 1,000,000.00 MOTORIZED FISHING BOATS AND FISH NETS 500,000.00 500,000.00 PROVISION OF MOTORIZED FISHING BOAT 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 NATIONAL GREENING PROGRAM: AGROFORESTRY (FRUIT TREES AND HIGH VALUED TREES) 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 2,998,758.46 2,998,758.46 CONSTRUCTION OF FLOOD CONTROL SYSTEM (RIVER RIPRAP) - CONSTRUCTION OF DRAINAGE SYSTEM - CONSTRUCTION OF CANALS/ DRAINAGE SYSTEM - REHABILITATION OR EXPANSION OR UPGRADE OF LEVEL 3 WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 REHABILITATION OF AN EXISTING LEVEL II WATER 1,000,000.00 1,000,000.00 CONSTRCUTION OF LEVEL III POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM 1,000,000.00 1,000,000.00 EMERGENCY EMPLOYMENT PROGRAM (CONSTRUCTION OF FLOOD CONTROL RIVER RIPRAP) 1,001,241.54 1,001,241.54 SUSTAINABLE LIVELIHOOD PROGRAM (MEAT PRODCUTION) CUM PRACTICAL SKILLS TRAINING 500,000.00 500,000.00 CONSTRUCTION OF ACCESS ROAD 500,000.00 500,000.00 1390 LUPON 5,050,000.00 - - - 5,750,000.00 - 1,600,000.00 - - 4,100,000.00 - - - - 16,500,000.00 ACQUISITION OF ONE (1) UNIT 4 WHEEL DRIVE FARM TRACTOR WITH COMPLETE IMPLEMENTS AND ACCESSORIES 2,500,000.00 2,500,000.00 PROVISION OF THIRTHY (30) UNITS OF MOTORIZED FISHING BOAT WITH FISHING GEARS 750,000.00 750,000.00 PROVISION OF 1 UNIT MECHANICAL DRYER 1,300,000.00 1,300,000.00 ESTABLISHMENT OF AGRO-FORESTRY NURSERY ENTERPRISE WITH SKILLS TRAINING ON NURSERY OPERATION AND SEEDLING PROPAGATION/ PRODUCTION 500,000.00 500,000.00 CONSTRUCTION OF 900 METERS OF DRAINAGE CANAL (PHASE I) 3,500,000.00 3,500,000.00 SALINTUBIG - PROVISION OF TWO (2) UNITS OF POTABLE WATER SYSTEM 2,250,000.00 2,250,000.00 CONSTRUCTION OF ONE (1) UNIT OF BARANGAY HEALTH STATION 600,000.00 600,000.00 CONSTRUCTION OF ONE (1) UNIT OF BARANGAY HEALTH STATION WITH HALF WAY HOUSE 1,000,000.00 1,000,000.00 LIVELIHOOD ASSISTANCE TO WOMEN'S SECTOR, INDIGENOUS PEOPLE (IPS), PERSONS WITH DISABILITY (PWDS) AND SENIOR CITIZENS 1,200,000.00 1,200,000.00 REHABILITATION OF TWO (2) UNITS OF DAY CARE CENTERS 500,000.00 500,000.00 CONSTRUCTION OF THREE (3) UNIT DAY CARE 2,400,000.00 2,400,000.00 1391 MANAY 2,500,000.00 - - - 4,500,000.00 - 500,000.00 - - 3,600,000.00 - - 500,000.00 2,900,000.00 14,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURAL FISHERIES PRODUCTION AND DEVELOPMENT (MOTORIZED FISHING BOAT, FISHNET) 2,000,000.00 2,000,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 PROGRESSIVE TYPE EVACUATION CENTER 2,600,000.00 2,600,000.00 FOOTBRIDGES 1,900,000.00 1,900,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (1 UNIT BLOOD CHEM MACHINE & 1 UNIT OF AUTOMATED BLOOD MACHINE) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SKILLS TRAINING AND ENTERPRISE DEVELOPMENT FOR POOR HOUSEHOLD UNDER 4PS BENEFICIARY) 2,200,000.00 2,200,000.00 BASIC SOCIAL SERVICE PROJECTS CONSTRUCTION/ REHABILITATION DAY CARE CENTER (1 UNIT CONSTRUCTION AT BRGY. CAYAWAN AND REHAB OF DAY CARE CENTER AT BRGY. CENTRAL 2 UNITS AND 1 UNIT BRGY. SAN FERMIN) 1,400,000.00 1,400,000.00 CORE LOCAL ROAD - POBLACION TO INAMBAWAN - TAGALABOG - BONGLOY 1,350,000.00 1,350,000.00 CORE LOCAL ROAD - POBLACION TO CATAGBAKAN TO ANIBONGAN 1,550,000.00 1,550,000.00 TECHNICAL VOCATIONAL TRAINING(DUAL TRAINING ON MASONRY AND CARPENTRY MUNICIPAL WIDE) 500,000.00 500,000.00 1392 SAN ISIDRO 1,200,000.00 - 2,000,000.00 - 6,500,000.00 - - 2,000,000.00 - 800,000.00 - - - - 12,500,000.00 NATIVE CHICKEN PRODUCTION 600,000.00 600,000.00 LIVESTOCK PRODUCTION (NATIVE HOG AND NATIVE GOAT) 600,000.00 600,000.00 NGP: RIVERBANK REHABILITATION 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 4,500,000.00 4,500,000.00 RIPRAPPING/ FLOOD CONTROL - CONSTRUCTION OF EVACUATION CENTER - POTABLE WATER SYSTEM (LEVEL II) 2,000,000.00 2,000,000.00 EMERGENCY EMPLOYMENT (WIN AP) 2,000,000.00 2,000,000.00 CONSTRUCTION OF 1 DAY CARE CENTER 800,000.00 800,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 1393 TARRAGONA - - 580,000.00 2,000,000.00 1,950,000.00 - 700,000.00 3,270,000.00 - 4,000,000.00 - - - - 12,500,000.00 NGP 580,000.00 580,000.00 IMPROVEMENT / REPAIR OF CLASSROOMS 2,000,000.00 2,000,000.00 CONSTRUCTION OF PWS 800,000.00 800,000.00 UPGRADING OF MDRRMC EMERGENCY RESPONE 1,150,000.00 1,150,000.00 BEMONC TRAINING FOR MIDWIVES/ RE TRAINING OF CHT VOLUNTEERS/ IMCI TRAINING/ INTENSIFY IEC CAMPAIGN RE INFECTIOUS DISEASES/ UPDATES ON DX, TX AND MANAGEMENT OF LEPROSY/ UPDATES ON DX AND TREATMENT TB/ STI - HIV AND AIDS PREVENTIVE/ DENGUE CONTROL/ HEALTH EMERGENCY MGT./ RNHEALS/RMPP 700,000.00 700,000.00 COMMON SERVICE FACILITY FOR BANANA CHIPS PRODUCTION AND DRESSMAKING LIVELIHOOD PROJECT FOR WOMEN ORGANIZATIONS 995,000.00 995,000.00 LIVELIHOOD DEVELOPMENT FOR MORO WOMEN 1,000,000.00 1,000,000.00 LIVELIHOOD DEVELOPMENT FOR FISHERFOLKS (ACQUISITION OF 20 MOTORIZED FISHING BOAT) 1,275,000.00 1,275,000.00 VARIOUS DSWD PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF FIVE (5) DAY CARE CENTER - CONSTRUCTION OF FOOTBRIDGE - CONSTRUCTION OF DRAINAGE SYSTEM - REGION XII 225,250,860.70 - 18,791,927.85 74,192,685.60 181,454,788.35 540,000.00 62,681,600.00 19,325,000.00 22,719,845.00 145,251,110.00 40,106,130.00 9,325,000.00 28,902,527.50 54,415,400.00 882,956,875.00 NORTH COTABATO 51,564,500.00 - 7,350,000.00 25,841,320.00 68,999,500.00 - 21,718,000.00 5,100,000.00 9,720,000.00 46,940,000.00 6,170,000.00 5,325,000.00 9,146,375.00 36,625,305.00 294,500,000.00 1394 ALAMADA 4,500,000.00 - - - 500,000.00 - - 500,000.00 - - - - - 10,000,000.00 15,500,000.00 LIVELIHOOD PROGRAM FOR LIVESTOCK A. DRAFT ANIMAL 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM FOR LIVESTOCK B. DAIRY CATTLE PRODUCTION & PROCESSING 1,500,000.00 1,500,000.00 LIVELIHOOD PROGRAM FOR HVCC A. STRAWBERRY PRODUCTION & PROCESSING 500,000.00 500,000.00 CONSTRUCTION OF AAA SLAUGHTERHOUSE 1,500,000.00 1,500,000.00 CAPDEV FOR CSOS 500,000.00 500,000.00 PANGKABUHAYAN SHOWCASE (STARTER KIT) 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 6,000,000.00 6,000,000.00 CORE LOCAL ROAD CONSTRUCTION ( CONCRETE TIRE PATH TYPE ROAD) - CORE LOCAL ROAD CONSTRUCTION ( CONCRETE TIRE PATH TYPE ROAD) - CORE LOCAL ROAD REHABILITATION - CORE LOCAL ROAD CONSTRUCTION ( CONCRETE TIRE PATH TYPE ROAD) - CORE LOCAL ROAD REHABILITATION - CORE LOCAL ROAD REHABILITATION - CORE LOCAL ROAD CONSTRUCTION ( CONCRETE TIRE PATH TYPE ROAD) - CORE LOCAL ROAD REHABILITATION - CORE LOCAL ROAD CONSTRUCTION ( CONCRETE TIRE PATH TYPE ROAD) - CORE LOCAL ROAD REHABILITATION - CORE LOCAL ROAD CONSTRUCTION ( CONCRETE TIRE PATH TYPE ROAD) - CONSTRUCTION OF BOX CULVERT (TUMACA-PIGCAWARAN) SECTION - CONCRETING OF MAJOR TOMINEZ RD (COMODA-TABARNO SECTION) - CONSTRUCTION OF EVACUATION CENTER @ DADO - CONSTRUCTION OF EVACUATION CENTER @ BAO - CONTRUCTION OF DRAINAGE CANAL - CORE LOCAL ROAD CONSTRUCTION/ MAINT./ REHAB - CONCRETING OF PUROK 2 (LAGARTO SECTION) ROAD 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINT./ REHAB- CONCRETING OF PUROK 3 (BORJA SECTION) ROAD 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINT./ REHAB - CONCRETING OF MARIANO GOMEZ ST. (MILITAR SECTION) ROAD 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINT./ REHAB - REHAB OF JUAN LUNA ST. 500,000.00 500,000.00 CORE LOCAL ROAD REHABILITATION 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION ( CONCRETE TIRE PATH TYPE ROAD) 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION ( CONCRETE TIRE PATH TYPE ROAD) 500,000.00 500,000.00 1395 ALEOSAN 3,500,000.00 - - - 5,490,000.00 - - - 1,035,000.00 750,000.00 - 1,725,000.00 - - 12,500,000.00 BAMBOO CRAFTS TRAINING & PRODUCTION 500,000.00 500,000.00 PROVISION OF MULTI-PURPOSE DRYING PAVEMENT WITH STORAGE 1,000,000.00 1,000,000.00 PROVISION OF TRADING POST 500,000.00 500,000.00 PROVISION OF AGRI-FISHERY BASED LIVELIHOOD PROJECT 1,000,000.00 1,000,000.00 PROVISION OF ORGANIC FERTILIZER PRODUCTION FACILITIES 500,000.00 500,000.00 VARIOUS DILG PROJECTS 2,265,000.00 2,265,000.00 SPRING DEVELOPMENT - CONSTRUCTION OF DRAINAGE CANAL AT SAN MATEO TO DUNGUAN - CONSTRUCTION OF WATER SYSTEM - LEVEL II 1,000,000.00 1,000,000.00 REHAB. OF POTABLE WATER SYSTEM 1,725,000.00 1,725,000.00 CSO TRAINING 500,000.00 500,000.00 ESTABLISHMENT OF AGRI-ECO TOURISM PARK 1,035,000.00 1,035,000.00 CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES AND AMENITIES 750,000.00 750,000.00 CONSTRUCTION OF SOLAR DRYER - INSTALLATION OF SHALLOWTUBE WELL - CONDUCT OF FARMER FIELD SCHOOL (FFS) FOR TILAPIA PRODUCTION - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR OF CLASSROOMS - (MNCHN) TRAINING OF HEALTH PROVIDERS ON BEMOWC - REPAIR OF DAY CARE CENTERS - BRGY LINE ENHANCEMENT PROGRAM 1,725,000.00 1,725,000.00 1396 ANTIPAS 2,000,000.00 - 500,000.00 850,000.00 3,550,000.00 - - - - 2,600,000.00 500,000.00 - 1,000,000.00 1,500,000.00 12,500,000.00 ORGANIC FERTILIZER PRODUCTION ( VERMICULTURE) 500,000.00 500,000.00 PROVISION OF RICE AND CORN SEEDS FOR FEDERATION OF FARMER'S ASSOCIATION 500,000.00 500,000.00 AGRI-FISHING LIVELIHOOD (FISHPEN, FINGERLINGS, LOGISTICS) 500,000.00 500,000.00 FOOD PROCESSING FACILITY FOR CASSAVA GROWERS 500,000.00 500,000.00 NATIONAL GREENING PROGRAM (COFFEE, CACAO, LAWAAN, NARRA) @ 5 HECTARES PER BARANGAY 500,000.00 500,000.00 GULAYAN SA PAARALAN (15 E/S) 150,000.00 150,000.00 PROVISION OF SCHOOL FURNITURES (SEATS) FOR 15 E/S AND 4 H/S 700,000.00 700,000.00 EVACUATION CENTER WITH COMPLETE FACILITIES 1,850,000.00 1,850,000.00 SALINTUBIG 1,200,000.00 1,200,000.00 CAPABILITY BUILDING FOR CSO'S 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM-MICRO ENTERPRISES DEVELOPMENT FOR INDIGENT SENIOR CITIZENS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM-MICRO ENTERPRISES DEVELOPMENT FOR KALIPI, MACRIC & IP WOMEN 600,000.00 600,000.00 CONSTRUCTION OF WOMEN'S CENTER 1,000,000.00 1,000,000.00 PROVISION OF ECCD MATERIALS FOR 33 DCC 500,000.00 500,000.00 ENTREPRENEURSHIP SKILLS TRAINING 500,000.00 500,000.00 TO BE DETEMINED 400,000.00 400,000.00 CORE LOCAL ROAD-REHABILITATION & CONSTRUCTION OF BOX CULVERT 1,100,000.00 1,100,000.00 MULTI PURPOSE DRYING PAVEMENT (MPDP) FOR COFFEE & CACAO - LIVELIHOOD PROGRAM-EMPLOYMENT FACILITATION AND SKILLS TRAINING FOR OUT OF SCHOOL YOUTH 500,000.00 500,000.00 SKILLS TRAINING FOR RELIGIOUS SECTOR 500,000.00 500,000.00 1397 ARAKAN 850,000.00 - 850,000.00 628,320.00 6,120,000.00 - - - - 2,380,000.00 - - 771,375.00 900,305.00 12,500,000.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENT AT SO. PINE TREE (LIBERTAD) AND SO. KABANATIHAN (TUMANDING) 850,000.00 850,000.00 UPSCALING AGRO-FORESTRY AND WATERSHED REHABILITATION PROJECT IN UPLAND COMMUNITIES OF MT. NAHUSON AND KIMAMULIG FOREST RESERVE (ALONG TINANAN-MAMAG-MEOCAN WATERSHED) 850,000.00 850,000.00 PROVISION OF SCHOOL FURNITURE (CLASSROOM CHAIRS) 628,320.00 628,320.00 DRR RELATED PROJECTS - CONSTRUCTION OF EVACUATION CENTER 1,700,000.00 1,700,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM (LEVEL II) AT BADIANGON 1,190,000.00 1,190,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM PROJECT (LEVEL II) WITH SANITATION AND HYGIENE COMPONENT AT BRGYS. ANAPOLON, DATU MANTANGKIL, KULAMAN VALLEY AND SO. KATINDO (MALIBATUAN) @ P800,000.00 EACH 2,720,000.00 2,720,000.00 CAPACITY BUILDING PROGRAM FOR CSOS AND BASIC SECTOR ORGANIZATIONS 510,000.00 510,000.00 CONSTRUCTION OF 1 UNIT DAY CARE CENTERS AT BARANGAYS GAMBODES, GANATAN, KULAMAN VALLEY AND SO. VALENCIA (STO. NIO) 2,380,000.00 2,380,000.00 REHABILITATION OF 4KM. CORE ROAD ALONG DATU MANTANGKIL TO LOWER LOMBO, KABALANTIAN ROAD 900,305.00 900,305.00 VOCATIONAL AND TECHNICAL EDUCATION /SKILLS TRAINING THRU STEP/TWSP SCHOLARSHIP IN 9 COURSES: DRESSMAKING, SHIELDED METAL ARC WELDING, DRIVING, AUTOMOTIVE SERVICING, COMPUTER IT SERVICING, COMMERCIAL COOKING, MASONRY, CARPENTRY, PLUMBING) 771,375.00 771,375.00 1398 BANISILAN 1,220,000.00 - 700,000.00 1,215,000.00 5,865,000.00 - 100,000.00 1,000,000.00 - 500,000.00 500,000.00 900,000.00 500,000.00 500,000.00 13,000,000.00 2 UNITS CORN SHELLER, 2 RICE THRESSER 500,000.00 500,000.00 PRODUCTION OF VERMI CAST OF 3 UNITS PRE PUB BUILDING 720,000.00 720,000.00 PROCUREMENT OF DIFFERENT TYPE OF FOREST TREES 700,000.00 700,000.00 REPAIR OF SIX UNITS CLASSROOMS IN ELEMENTARY SCHOOLS 675,000.00 675,000.00 REPAIR OF FIVE (5) UNIT CLASSROOMS IN HIGHSCHOOLS, 540,000.00 540,000.00 VARIOUS DILG PROJECTS 1,500,000.00 1,500,000.00 1-STANDBY GENERATING SET, AND BASE RADIO - ALL FMR THAT NEEDS REPAIR - CONSTRUCTION OF DRAINAGE CANALS - ONE UNIT EVACUATION CENTER 500,000.00 500,000.00 EXPANSION OF 600 HH WATER SERVICE LINES 3,365,000.00 3,365,000.00 CSO CAPACITY BUILDING 500,000.00 500,000.00 TRAININGS AND ORIENTATATION 100,000.00 100,000.00 4 DISADVANTAGE WORKERS/BRGY. AT P270.00/DAY CONDUCTING COMM. WORKS 500,000.00 500,000.00 4 DESERVING STUDENTS PER BARANGAY PROVIDED THEY MEET THE QUALIFICATION 500,000.00 500,000.00 4 SEWING MACHINES WITH MATERIALS AND TRAININGS TO 4PS WOMEN 500,000.00 500,000.00 TRAININGS FOR COMMUNITY BASED ORGANIZATION RECOGNIZED BY LGU 500,000.00 500,000.00 COMPOSITION OF 10 HHS TO BE ASSISTED BY NAPC AND BUSERMIN 500,000.00 500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 900,000.00 900,000.00 TRAINING ON WELDING, HEAVY EQUIPMENT OPERATION AND RUBBER PROCESSING 500,000.00 500,000.00 1399 CARMEN 8,330,000.00 - - 850,000.00 425,000.00 - 5,100,000.00 - 1,700,000.00 1,700,000.00 1,870,000.00 1,700,000.00 425,000.00 1,400,000.00 23,500,000.00 CONSTRUCTION OF SLAUGHTER HOUSE 850,000.00 850,000.00 POST HARVEST FACILITIES 2,975,000.00 2,975,000.00 BANANA KETCHUP AND BANANA CHIPS PROCESSING FACILITIES 850,000.00 850,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENT OF ORGANIC FERTILIZERS PRODUCTION FACILITIES 680,000.00 680,000.00 POST HARVEST FACILITIES AND EQUIPMENT(MULTI-PURPOSE DRYING PAVEMENT) 2,975,000.00 2,975,000.00 BASIC EDUCATIONAL FACILITIES 850,000.00 850,000.00 CAPACITY BUILDING FOR CSO'S 425,000.00 425,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 5,100,000.00 5,100,000.00 SPRING DEVELOPMENT PROGRAM 1,700,000.00 1,700,000.00 DAY CARE CENTER 1,700,000.00 1,700,000.00 RURAL MICRO ENTERPRISES DEVELOPMENT PROGRAM 1,870,000.00 1,870,000.00 VARIOUS LGSF PROJECTS 1,400,000.00 1,400,000.00 CORE LOCAL ROAD CONSTRUCTION MAINTENANCE/REHABILITATION - FLOOD CONTROL - ON GRID SITIO ELECTRIFICATION PROGRAM(SEP)40-60 HOUSEHOLD 1,700,000.00 1,700,000.00 SKILLS TRAINING TESDA 425,000.00 425,000.00 1400 KABACAN 1,714,500.00 - 1,000,000.00 2,600,000.00 2,851,500.00 - 3,214,000.00 - - 6,120,000.00 - - - - 17,500,000.00 IRRIGATION PROJECTS 1,184,500.00 1,184,500.00 VARIOUS DA PROJECTS 530,000.00 530,000.00 POST HARVEST FACILITY AND EQUIPMENT - INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT - NATIONAL GREENING PROGRAM (NGP) 1,000,000.00 1,000,000.00 BASIC EDUCATION FACILITY 2,600,000.00 2,600,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) 2,851,500.00 2,851,500.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 3,214,000.00 3,214,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 4,500,000.00 4,500,000.00 PROTECTIVE SERVICES -CAPACITY BUILDING 1,620,000.00 1,620,000.00 1401 KIDAPAWAN CITY 2,700,000.00 - - 2,380,000.00 500,000.00 - 2,320,000.00 1,600,000.00 500,000.00 2,500,000.00 - - 1,500,000.00 500,000.00 14,500,000.00 VARIOUS DA PROJECTS 2,700,000.00 2,700,000.00 ENTERPRISE DEVELOPMENT (SUPPORT TO ARC) - ESTABLISHMENT OF COCOHUSK PROCESSING PLANT - IMPROVEMENT/REHABILITATION OF THE TILAPIA HATCHERY AND BREEDING STATION - ESTABLISHMENT OF ORGANIC TRADING POST - PROVISION OF PRE AND POST HARVEST FACILITIES FOR RICE PRODUCTION - REPAIR/REHABILITATION OF CLASSROOMS 1,400,000.00 1,400,000.00 PROCUREMENT OF ARMCHAIRS 980,000.00 980,000.00 CAPACITY BUILDING FOR CIVIL SOCIETY ORGANIZATIONS 500,000.00 500,000.00 CONSTRUCTION OF BIRTHING CENTERS WITH EQUIPMENT 2,320,000.00 2,320,000.00 ALALAY SA HANAPBUHAY (STARTER KIT-LIVELIHOOD ASSISTANCE PROGRAM) 1,100,000.00 1,100,000.00 KABUHAYAN PARA SA MAGULANG NG MGA BATANG MANGGAGAWA (STARTER KIT-KASAMA PROJECT) 500,000.00 500,000.00 KANSAL FALL ECO-ADVENTURE PARK PROJECT 500,000.00 500,000.00 EVACUATION FACILITY 2,500,000.00 2,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION PROGRAM 500,000.00 500,000.00 TRAINING FOR WORK SCHILARSHIP (SKILLS DEVELOPMENT) 1,500,000.00 1,500,000.00 1402 LIBUNGAN 3,500,000.00 - - - - - - - 500,000.00 - - - - 8,500,000.00 12,500,000.00 CONTRUCTION OF SLAUGHTER HOUSE 3,500,000.00 3,500,000.00 IMPROVEMENT OF SAMVEREN TOURISM SITE 500,000.00 500,000.00 CONCRETING OF BARONGIS ROAD 5,000,000.00 5,000,000.00 IMPROVEMENT OF ANTARA, NICAAN ROAD 1,000,000.00 1,000,000.00 CONCRETING OF SITIO BANGAR- BATIOCAN- DEMAPACO ROAD 2,500,000.00 2,500,000.00 1403 MAGPET 1,000,000.00 - 2,800,000.00 320,000.00 5,680,000.00 - - 2,000,000.00 - - 700,000.00 - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION ( VERMICULTURE) 500,000.00 500,000.00 NATIONAL GREENING PROGRAM 2,800,000.00 2,800,000.00 GULAYAN SA PAARALAN 320,000.00 320,000.00 VARIOUS WATER PROJECTS 5,680,000.00 5,680,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) - DOLE INTEGRATED LIVELIHOOD PROGRAM (DILP): COMMUNITY- BASED PROJECTS 2,000,000.00 2,000,000.00 YAMAN PINOY INDUSTRY CLUSTERING PROGRAM 700,000.00 700,000.00 1404 MAKILALA 2,000,000.00 - - 4,578,000.00 750,000.00 - 2,107,000.00 - 1,465,000.00 600,000.00 500,000.00 - - 500,000.00 12,500,000.00 POST-HARVEST FACILITIES AND EQUIPMENT (MULTI-PURPOSE DRYING PAVEMENT) 500,000.00 500,000.00 SUSTAINABLE AGRI- BASED LIVELIHOOD AND OTHER AGRI- BUSINESS INVESTMENT ( RUBBER DEVELOPMENT) 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION FACILITY 500,000.00 500,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM (HONORARIUM FOR PROFESSOR OF THE LGU-RUN STATE COLLEGE) 4,578,000.00 4,578,000.00 ESTABLISHMENT OF EVACUATION BUILDING WITH FACILITIES AND AMENITIES 250,000.00 250,000.00 CAPABILITY TRAINING FOR CSOS (AIM/DAP) 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (DIAGNOSTIC EXAMINATION EQUIPMENT) 500,000.00 500,000.00 ESTABLISHMENT OF BARANGAY BIRTHING CENTER (3 BEDS CAPACITY ) 1,607,000.00 1,607,000.00 CAPABILITY BUILDING FOR HOME-STAY 505,000.00 505,000.00 PREPARATION OF SITE DEVELOPMENT PLAN OF NEWISRAEL ECO- ADVENTURE PARK 960,000.00 960,000.00 ESTABLISHMENT OF SENIOR CITIZENS BUILDING 600,000.00 600,000.00 SMALL & MEDIUM ENTERPRISE ROVING ACADEMY (SMERA) TRAINING - TRAINING FOR PWD, TRANSPORT SECTOR, SMALL VENDORS AND SMALL FURNITURE INDUSTRY INCLUDING PACKAGING 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 1405 MATALAM 3,100,000.00 - - 1,500,000.00 4,500,000.00 - 1,500,000.00 - - 1,000,000.00 1,100,000.00 - 1,500,000.00 2,300,000.00 16,500,000.00 POST HARVEST FACILITIES (DRYER) 500,000.00 500,000.00 TRADING POST 2,000,000.00 2,000,000.00 FARM IMPLEMENT /TOOLS ASSORTED 600,000.00 600,000.00 BASIC EDUC. FACILITIES REPAIR/REHAB. OF CLASSROOM, PROVISION OF SCH. FURNITURES 1,500,000.00 1,500,000.00 VARIOUS DILG PROJECTS 2,900,000.00 2,900,000.00 CONSTRUCTION OF DRRM- EVACUATION CENTER WITH COMPLETE FACILITIES - DRRM- FLOOD CONTROL TECHNOLOGIES - UPGRADING OF WATER SYSTEM 1,100,000.00 1,100,000.00 CAPACITY BUILDING OF CSO 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM (MATERNAL HEALTH, NEONATAL, CHILD HEALTH & NUTRITION 1,500,000.00 1,500,000.00 CONSTRUCTION OF IMPROVISE/SIMPLIFIED CRISIS CENTER 1,000,000.00 1,000,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROJECT (COSMETOLOGY, MEAT PROSESSING , ECT.) 1,100,000.00 1,100,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 800,000.00 800,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE /REHABILITATION 1,500,000.00 1,500,000.00 SKILL'S TRAINING (MOBILE-CELLPHONE REPAIR WORKSHOP), DRESS MAKING ETC 1,500,000.00 1,500,000.00 1406 MIDSAYAP 8,500,000.00 - 500,000.00 6,500,000.00 7,000,000.00 - 1,000,000.00 - - 4,500,000.00 500,000.00 - 1,500,000.00 - 30,000,000.00 HIGH VALUE CROP DEVELOPMENT PROGRAM 2,000,000.00 2,000,000.00 MOTORIZED FISHING BOATS AND NETS 1,500,000.00 1,500,000.00 ESTABLISHMENT OF ORGANIC FACILITY AND EQUIPMENT 1,000,000.00 1,000,000.00 INFRA SUPPORT TO AGRICULTURE 3,000,000.00 3,000,000.00 PURCHASE OF FARM EQUIPMENT FLOATING TILLER 1,000,000.00 1,000,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 ABOT ALAM 1,000,000.00 1,000,000.00 REPAIR AND REHABILITATIONS OF CLASSROOM 2,000,000.00 2,000,000.00 PROVISION OF SCHOOL FURNITURES 2,000,000.00 2,000,000.00 REPAIR AND REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 MULTI-PURPOSE PAVEMENT CENTER 3,500,000.00 3,500,000.00 SALINTUBIG 3,500,000.00 3,500,000.00 BIRTHING CENTER 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,000,000.00 2,000,000.00 SUPPLEMENTAL FEEDING 1,000,000.00 1,000,000.00 CHILDREN'S PARTICIPATION (SPORT FEST FOR CHILDREN) 500,000.00 500,000.00 MOBILE LIBRARY (ECCD) 1,000,000.00 1,000,000.00 CAPABILITY BUILDING FOR YAMAN PINOY AND LRED 500,000.00 500,000.00 SKILLS TRAIING ON MASONRY, CARPENTRY, ELECTRICAL PLUMBING, WELDING, BAKING, DRESSMAKING, BEAUTY CULTURE, FOOD ROCESSING AND COMPUTER HARDWARE 1,000,000.00 1,000,000.00 RURAL IMPROVEMENT CLUB 500,000.00 500,000.00 1407 M'LANG 2,500,000.00 - - 470,000.00 3,500,000.00 - 2,220,000.00 - 1,720,000.00 7,090,000.00 500,000.00 - 500,000.00 1,000,000.00 19,500,000.00 CONSTRUCTION OF SMALL FARM RESERVOIR (SFR) 1,000,000.00 1,000,000.00 ESTABLISHMENT OF ORGANIC PRODUCTS TRADING POST 1,500,000.00 1,500,000.00 GULAYAN SA PAARALAN (39 ELEMENTARY AND 8 SECONDARY SCHOOLS) 470,000.00 470,000.00 RESCUE EQUIPMENT (PROCUREMENT OF RESCUE EQUIPMENT PRESCRIBED BY OCD-DND) 1,500,000.00 1,500,000.00 FLOOD CONTROL PROJECT (CONSTRUCTION OF DRAINAGE CANALS) 2,000,000.00 2,000,000.00 CONSTRUCTION OF BIRTHING FACILITY 1,370,000.00 1,370,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM - MATERNITY AND NEWBORN CARE 500,000.00 500,000.00 RABIES ELIMINATION (TRAINING COMPONENT ONLY) 350,000.00 350,000.00 DEVELOPMENT OF POMELO FRUIT PARK 1,220,000.00 1,220,000.00 PREPARATION OF LOCAL TOURISM PLAN 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR WOMEN, PWDS AND SELECTED SENIOR CITIZENS 1,000,000.00 1,000,000.00 CONSTRUCTION OF BAHAY PAG-ASA FOR CICL 1,375,000.00 1,375,000.00 CONSTRUCTION OF DAY CARE CENTER (3 DCCS) 2,340,000.00 2,340,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 1,375,000.00 1,375,000.00 PROTECTIVE SERVICES - CAPACITY BUILDING FOR DCWS AND PROVISION OF ECCD LEARNING MATERIALS FOR DCCS AND SUPERVISED NEIGHBORHOOD PLAYGROUPS 1,000,000.00 1,000,000.00 LOCAL REGIONAL ECONOMIC DEVELOPMENT (LRED) - FORMULATION OF MUNICIPAL INVESTMENT PLAN 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 1,000,000.00 1,000,000.00 LOCAL ROAD CONSTRUCTION (SAND AND GRAVEL ROAD) - CAPACITY BUILDING FOR CSOS - YAMAN-PINOY SKILL AND INDUSTRY-FOCUS TRAINING (DRIVING, IT SERVICING, WELDING & RUBBER PRODUCTION) 500,000.00 500,000.00 1408 PIGKAWAYAN - - 500,000.00 2,300,000.00 1,800,000.00 - - - - 2,300,000.00 - - - 7,600,000.00 14,500,000.00 REFORESTATION AND REHABILITATION OF PAYONG-PAYONG WATERSHED AREA 500,000.00 500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 1,800,000.00 1,800,000.00 REPAIR/REHABILITATION OF CLASSROOMS AT PNHS 500,000.00 500,000.00 CONSTRUCTION OF DRAINAGE SYSTEM AT RIZAL EXTENSION AT POBLACION 2 1,300,000.00 1,300,000.00 REPAIR/REHABBILITATION OF BARANGAY WATER SYSTEM AT CENTRAL PANATAN 500,000.00 500,000.00 CONSTRUCTION OF WOMEN'S CRISES CENTER FOR VAWC VICTIMS 2,300,000.00 2,300,000.00 REPAIR/ REHAB. OF SOUTH MANUANGAN - NEWCULASI BRGY. ROAD 2,100,000.00 2,100,000.00 ASPHALTING OF OLD CEMETERY - MUNICIPAL MEMORIAL PARK BARANGAY ROAD 3,200,000.00 3,200,000.00 VARIOUS LGSF PROJECTS 2,300,000.00 2,300,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR/ REHAB. OF TIWASAY-LAMPAKI BARANGAY ROAD(DALUMANGKUM AREA) - REPAIR/ REHAB. OF NEWCULASI - MOLOK BARANGAY ROAD - 1409 PIKIT 4,000,000.00 - - 1,000,000.00 13,575,000.00 - 2,550,000.00 - 700,000.00 6,250,000.00 - - - 1,925,000.00 30,000,000.00 VARIOUS DA PROJECTS 3,500,000.00 3,500,000.00 TRADING POSTS - POST HARVEST FACILITIES AND EQUIPMENT (RICE) A. MULTI- PURPOSE DRYING PAVEMENT - POST HARVEST FACILITIES AND EQUIPMENT (RICE) B. RICE THRESHER WITH TRAILER - FARM IMPLEMENTS MACHINERIES FOR RICE A. POWER TILLER WITH TRAILER - FARM IMPLEMENTS MACHINERIES FOR RICE B. HAND TRACTOR WITH TRAILER - ORGANIC FERTILIZER FACILITIES AND PRODUCTION - TRAINING ON LIVESTOCK AND HVCDP 500,000.00 500,000.00 BASIC EDUCATION FACILITIES/PROVISION OF SCHOOL FURNITURE ( NOTE: TO COORDINATE WITH DEPED TO IDENTIFY THE SITE, NO. OF SCHOOLS, ETC. ) 500,000.00 500,000.00 GULAYAN SA PAARALAN ( PROVISION OF SEEDS, TOOLS, & TRAINING) 500,000.00 500,000.00 VARIOUS DILG PROJECTS 7,075,000.00 7,075,000.00 RESCUE EQUIPMENTS - FLOOD CONTROL (IMPROVEMENT OF MAIN DRAINAGE CANAL) - CONSTRUCTION OF WATER SUPPLY SYSTEM LEVEL II 2,250,000.00 2,250,000.00 CONSTRUCTION OF SPRING DEVELOPMENT WATER SYSTEM LEVEL II 3,750,000.00 3,750,000.00 CAPACITY BUILDING FOR CSO'S 500,000.00 500,000.00 CONSTRUCTION OF HEALTH STATION 1,275,000.00 1,275,000.00 CONSTRUCTION OF HEALTH STATION 1,275,000.00 1,275,000.00 RESTORATION OF SPANISH FORT 700,000.00 700,000.00 BAGMAKING & SOUVENIR ITEMS (SLP) 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTERS 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTERS 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTERS 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTERS 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTERS 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTERS 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTERS 750,000.00 750,000.00 CAPACITY BUILDING OF DAY CARE WORKERS ON EARLY CHILDHOOD CARE & DEVELOPMENT & CAPACITY BUILDING OF DAY CARE WORKERS AND PARENT VOLUNTEER'S ON PARENT EFFECTIVENESS SERVICE 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 1,925,000.00 1,925,000.00 CONCRETING OF MUNICIPAL ST. ROAD SECTIONS: A. DATU PIANG ST. - CONCRETING OF MUNICIPAL ST. ROAD SECTIONS: B. PENDATUN DRIVE EXTENSION (MUNICIPAL HALL TO PORT PIKIT SPANISH FORTRESS PORTION) - CONCRETING OF MUNICIPAL ST. ROAD SECTIONS: C. CABALLERO ST. - CONCRETING OF MUNICIPAL ST. ROAD SECTIONS: D. HIGHWAY CFCST - 1410 PRESIDENT ROXAS 1,500,000.00 - 500,000.00 650,000.00 4,300,000.00 - - - 2,100,000.00 1,000,000.00 - 1,000,000.00 1,450,000.00 - 12,500,000.00 AGRICULTURALFERIIZER FOR ORAGNIC FERTIIIZER PODUCT 1,500,000.00 1,500,000.00 PLANTING OF FOREST TREES AT THE BOUNDARY OF WATERSHED TO PREVENT ENCROACHMENT ALONG KABACAN BRIDGE FOR FIOOD CONTROL 500,000.00 500,000.00 GUIAYAN SA PAARALAN 480,000.00 480,000.00 REPAIR OF CLASSROOM AT SAIAT ELEMENTARY SCHOOI 170,000.00 170,000.00 VARIOUS DILG PROJECTS 1,300,000.00 1,300,000.00 FOOT BRIDGE - FOOT BRIDGE - SALINTUBIG- PROVISION OF POTABLE WATER SUPPIY 1,800,000.00 1,800,000.00 SALINTUBIG - PROVISION OF POTABLE WATER SUPPIY 700,000.00 700,000.00 CAPACITY BUIIDING FOR CSO 500,000.00 500,000.00 ESTABIISHMENT OF BOTANICAI GARDEN 700,000.00 700,000.00 IMPROVEMENT OF PARKING AREA AT HILLSIDE SPRING RESORT OF LGU - PRES. ROXAS 700,000.00 700,000.00 IMPROVEMENT OF SWIMMING POOI AT HILLSIDE SPRING RESORT OF LGU - PRES. ROXAS 700,000.00 700,000.00 LIVELIHOOD (SLP) 1,000,000.00 1,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,000,000.00 1,000,000.00 COMMUNITY BASED SKILL TRAINING VOC - TECHNICAL 1,450,000.00 1,450,000.00 1411 TULUNAN 650,000.00 - - - 2,593,000.00 - 1,607,000.00 - - 7,650,000.00 - - - - 12,500,000.00 ORGANIC AGRICULTURE 650,000.00 650,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL II 2,593,000.00 2,593,000.00 CONSTRUCTION OF BIRTHING CENTER WITH EQUIPTMENT 1,607,000.00 1,607,000.00 FOOD FOR SCHOOL PROGRAM TO INDIGENT STUDENTS IN ELEMENTARY AND SECONDARY DURING LEAN MONTH OF THE YEAR, 2015 1,700,000.00 1,700,000.00 SUSTAINABLE LIVELIHOOD THRU- SELF EMPLOYMENT ASSISSTANCE (SEA-K) PROGRAM/ LIVELIHOOD CAPITAL ASSISSTANCE PROGRAM (MICRO- ENTERPRISE DEVELOPMENT 5,950,000.00 5,950,000.00 SARANGANI 36,448,940.00 - 2,063,750.00 9,062,500.00 35,842,685.00 - 15,216,200.00 1,800,000.00 2,450,000.00 11,199,800.00 9,731,000.00 - 5,255,000.00 10,887,000.00 139,956,875.00 1412 ALABEL (CAPITAL) 4,491,440.00 - - 1,000,000.00 6,708,560.00 - 1,000,000.00 - 500,000.00 2,100,000.00 3,200,000.00 - - 500,000.00 19,500,000.00 SUSTAINABLE AGRI- BUSINESS AND RURAL ENTREPRISE DEVELOPMENT PROJECT 491,440.00 491,440.00 ORGANIC VEGETABLE PRODUCTION 500,000.00 500,000.00 ESTABLISHMENT OF ICE MAKING FACILITY PROJECT 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS GOAT AND DAIRY PRODUCTION PROJECT 500,000.00 500,000.00 SWINE PRODUCTION (DA-08) 500,000.00 500,000.00 PROVISION OF MOTORIZED FISHING BOAT 700,000.00 700,000.00 PROVISION OF CORN SHELLER 800,000.00 800,000.00 REPAIR OF 10 CLASSROOMS 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 6,018,160.00 6,018,160.00 REHABILITATION/EXPANSION/UPGRADING OF LEVEL III WATER SUPPLY SYSTEMS INCLUDING APPROPRIATE WATER TREATMENT SYSTEMS - REHABILITATION OF LEVEL 1 WATER SYSTEM - CAPABILITY BUILDING FOR CSO 690,400.00 690,400.00 ESTABLISHMENT OF HEALTH EMERGENCY MNG'T SERVICES (HEMS) OPERATION FACILITY 1,000,000.00 1,000,000.00 TOURISM INFORMATION CENTER 300,000.00 300,000.00 TOURISM INFORMATION PLAN 200,000.00 200,000.00 CAPABILITY BUILDING FOR ECCD SERVICES PROVIDERS / CHILD CARE GIVERS 500,000.00 500,000.00 PROVISION OF ECCD LEARNING MATERIALS & HYGIENE KITS FOR DCC'S & SNP SITES 600,000.00 600,000.00 HAND WASHING AND PLAYGROUND FACILITIES FOR DAY CARE CENTER 1,000,000.00 1,000,000.00 WOMEN'S PRODUCT ENHANCEMENT PROJECT 500,000.00 500,000.00 FOOD PROCESSING FACILITY WITH ACCESSORIES 2,000,000.00 2,000,000.00 COFFEE PRODUCTION MANAGEMENT 700,000.00 700,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 1413 GLAN 8,176,000.00 - 1,563,750.00 2,090,000.00 6,492,125.00 - - 1,800,000.00 450,000.00 675,000.00 3,080,000.00 - 630,000.00 - 24,956,875.00 VARIOUS DA PROJECTS 3,000,000.00 3,000,000.00 COLD STORAGE FACILITY - FARM IMPLEMENTS /TOOLS - ORGANIC FERTILIZER PRODUCTION FACILITY - VARIOUS BFAR PROJECTS 1,376,000.00 1,376,000.00 MARINE RESERVE & FISH SANCTUARIES / MARINE PROTECTED AREAS - AGRI-FISHERY TRAINING SUPPLIES & MATERIALS - A. INFRASTRUCTURE SUPPORT TO AGRI & FISHERY PRODUCTION - B. MOTORIZED FISHING BOAT - C. FISHNETS (GILL NETS) - D. CORN SHELLER 800,000.00 800,000.00 TRADING POST 600,000.00 600,000.00 POST HARVEST FACILITIES: MULTIPURPOSE DRYING PAVEMENT 2,400,000.00 2,400,000.00 NATIONAL GREENING PROGRAM 1,563,750.00 1,563,750.00 GULAYAN SA PAARALAN 990,000.00 990,000.00 ABOT ALAM PROGRAM 1,100,000.00 1,100,000.00 FLOOD CONTROL 1,500,000.00 1,500,000.00 SALINTUBIG 4,492,125.00 4,492,125.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 DILP (DOLE INTEGRATED LIVELIHOOD PROGRAM) 1,800,000.00 1,800,000.00 CAPABILITY BUILDING FOR TOURISM 300,000.00 300,000.00 TOURISM PROMOTION COLLATERAL 150,000.00 150,000.00 CONSTRUCTION OF HALF-WAY HOME 675,000.00 675,000.00 YAMAN PINOY 2,200,000.00 2,200,000.00 OTOP EXPRESS 880,000.00 880,000.00 TECHNICAL SKILLS TRAINING FOR PWD 630,000.00 630,000.00 1414 KIAMBA 2,605,500.00 - - - 7,922,000.00 - 983,500.00 - - 868,500.00 1,383,500.00 - - 1,737,000.00 15,500,000.00 POVERTY-REDUCTION LIVELIHOOD FOR COASTAL AREAS 868,500.00 868,500.00 ADDITIONAL FARM FACILITIES FOR EFFECTIVE CROP PRODUCTION 868,500.00 868,500.00 ALTERNATIVE POVERTY-REDUCTION LIVELIHOOD FOR THE AREA 868,500.00 868,500.00 VARIOUS DILG PROJECTS 2,711,000.00 2,711,000.00 DISASTER PREVENTION FOR FLOOD-PRONE AREAS - DISASTER PREVENTION FOR FLOOD-PRONE AREAS - DISASTER PREVENTION FOR FLOOD-PRONE AREAS - DISASTER PREVENTION FOR FLOOD-PRONE AREAS - DISASTER PREVENTION FOR FLOOD-PRONE AREAS - A MOTORIZED VEHICLE (TRUCK) FOR TRANSPORTATION IN CASE OF DISASTERS/EMERGENCIES. - FULL ACCESS TO POTABLE WATER SUPPLY ON THE AREA 868,500.00 868,500.00 FULL ACCESS TO POTABLE WATER SUPPLY ON THE AREA 868,500.00 868,500.00 FULL ACCESS TO POTABLE WATER SUPPLY ON THE AREA 868,500.00 868,500.00 FULL ACCESS TO POTABLE WATER SUPPLY ON THE AREA 868,500.00 868,500.00 FULL ACCESS TO POTABLE WATER SUPPLY ON THE AREA 868,500.00 868,500.00 FULL ACCESS TO POTABLE WATER SUPPLY ON THE AREA 868,500.00 868,500.00 INSTALLATION OF PLACENTA PITS IN BHS OF LOMUYON, LAGUNDI, MALIGANG, POBLACION AND SULI - REHABILITATION AND ENHANCEMENT OF FACILITIES OF KIAMBA RHU 983,500.00 983,500.00 COMPLETE AND CONDUCIVE HEALTH ACCESS 868,500.00 868,500.00 ALTERNATIVE POVERTY-REDUCTION LIVELIHOOD FOR R.I.C CHAPTERS 1,383,500.00 1,383,500.00 PRESERVATION OF BARANGAY ROAD FROM DAMAGES CAUSED BY FLOOD 868,500.00 868,500.00 A CONCRETIZED BARANGAY ROAD FOR EASY ACCESS AMONG RESIDENTS. 868,500.00 868,500.00 1415 MAASIM 5,350,000.00 - - - 1,000,000.00 - 4,150,000.00 - 1,500,000.00 2,500,000.00 500,000.00 - - 2,500,000.00 17,500,000.00 MULTI-PURPOSE DRYING PAVEMENT (MPDP) WITH MINI- WAREHOUSE 3,350,000.00 3,350,000.00 PROVISION OF PAYAO AND FISHING BANCAS 2,000,000.00 2,000,000.00 CONSTRUCTION OF BOX CULVERT 1,000,000.00 1,000,000.00 CONST. OF BARANGAY HEALTH STATION BUILDING 3,000,000.00 3,000,000.00 IMPROVT./COMPLETION OF BIRTHING HOME 1,150,000.00 1,150,000.00 CONST. OF TOURISM INFORMATION CENTER BUILDING 1,000,000.00 1,000,000.00 PRODUCTION OF PROMOTIONAL MATERIALS 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CAPABILITY-BUILDING FOR DCWS, SNP & PES WORKERS AND PROVISION OF ECCD LEARNING AND HYGIENE KIT 500,000.00 500,000.00 CONSTRUCTION OF WOMEN CRISIS CENTER 2,000,000.00 2,000,000.00 INDUSTRY CLUSTERING 500,000.00 500,000.00 VARIOUS LGSF PROJECTS 2,500,000.00 2,500,000.00 ROAD REHABILITATION - CAPACITY-BUILDING FOR CSOS - 1416 MAITUM 600,000.00 - 500,000.00 2,700,000.00 1,700,000.00 - 3,150,000.00 - - 3,850,000.00 - - - - 12,500,000.00 MULTIPURPOSE DRYING PAVEMENT W/ MINI WAREHOUSE FOR RICE 600,000.00 600,000.00 NATIONAL GREENING PROGRAM 500,000.00 500,000.00 REHABILITATION OF SCHOOL BUILDINGS 540,000.00 540,000.00 REHABILITATION OF SCHOOL BUILDINGS 540,000.00 540,000.00 REHABILITATION OF SCHOOL BUILDINGS 540,000.00 540,000.00 REHABILITATION OF SCHOOL BUILDINGS 540,000.00 540,000.00 REHABILITATION OF SCHOOL BUILDINGS 540,000.00 540,000.00 GK ECO-VILLAGE WATER SYSTEM - LEVEL II 1,700,000.00 1,700,000.00 HEALTH FACILITIES ENHANCEMENT 900,000.00 900,000.00 HEALTH FACILITIES ENHANCEMENT 1,350,000.00 1,350,000.00 HEALTH FACILITIES ENHANCEMENT 900,000.00 900,000.00 VARIOUS DSWD PROJECTS 3,850,000.00 3,850,000.00 UPGRADING OF DAY CARE CENTERS - UPGRADING OF DAY CARE CENTERS - CONSTRUCTION OF MUNICIPAL EVACUATION CENTER W/ FACILITIES - PROVISION OF INSTRUCTIONAL MATERIALS & EQUIPMENTS - ESTABLISHMENT OF TUKEH'BEN'LAY VILLAGE HOUSING FACILITIES/UTILITIES - 1417 MALAPATAN 9,650,000.00 - - - 5,600,000.00 - - - - - 1,100,000.00 - 2,500,000.00 6,150,000.00 25,000,000.00 VARIOUS DA PROJECTS 9,650,000.00 9,650,000.00 PORTS/WHARVES - TRADING POSTS - TRADING POSTS - TRADING POSTS - FARM IMPLEMENTS/ TOOLS - FARM IMPLEMENTS/ TOOLS - ORGANIC FERTILIZER PRODUCTION - FOOTBRIDGE 600,000.00 600,000.00 FOOTBRIDGE 650,000.00 650,000.00 EVACUATION FACILITY 1,250,000.00 1,250,000.00 EVACUATION FACILITY 600,000.00 600,000.00 SALINTUBIG- PROVISION OF POTABLE WATER 1,250,000.00 1,250,000.00 SALINTUBIG- PROVISION OF POTABLE WATER 1,250,000.00 1,250,000.00 SHARED SERVICE FACILITY 1,100,000.00 1,100,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE REHABILITATION 1,250,000.00 1,250,000.00 INTEGRATED FOOD COMMUNITY CENTER 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE REHABILITATION 1,250,000.00 1,250,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE REHABILITATION 1,250,000.00 1,250,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE REHABILITATION 1,250,000.00 1,250,000.00 CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE REHABILITATION 650,000.00 650,000.00 TECHNICAL VOCATION TRAINING/ COMMUNITY BASED TRAINING 500,000.00 500,000.00 TECHNICAL VOCATION TRAINING/ COMMUNITY BASED TRAINING 2,000,000.00 2,000,000.00 1418 MALUNGON 5,576,000.00 - - 3,272,500.00 6,420,000.00 - 5,932,700.00 - - 1,206,300.00 467,500.00 - 2,125,000.00 - 25,000,000.00 ESTABLISHMENT OF POST HARVEST FACILITY: COFFEE DEHULLER 637,500.00 637,500.00 AGRO-FOREST PRODUCTION 2,507,500.00 2,507,500.00 ABACA FIBER PRODUCTION 165,240.00 165,240.00 ANIMAL HEALTH MANAGEMENT 565,760.00 565,760.00 ESTABLISHMENT OF POST HARVEST FACILITY: MINI-CORN MILL 510,000.00 510,000.00 ESTABLISHMENT OF POST HARVEST FACILITY: TRAVELLING CORN SHELLER 510,000.00 510,000.00 ESTABLISHMENT OF POST HARVEST FACILITY: MULTI-PURPOSE DRYING PAVEMENT (SOLAR DRYER) 680,000.00 680,000.00 REPAIR OF CLASSROOMS FOR: NAGPAN ES, TAMBAN CENTRAL EELEMENTARY SCHOOL, MALANDAG CENTRAL ELEMENTARY SCHOOL, NIAN INTEGRATED SCHOOL, BIANGAN ELEMENTARY SCHOOL, OSMEA ELEMENTARY SCHOOL, MALUNGON CENTRAL ELEMENTARY SCHOOL, MALUNGON NATIONAL HIGH SCHOOL, KIBLAT ELEMENTARY SCHOOL, UPPER MAINIT ELEMENTARY SCHOOL, TANDAWANAN ELEMENTARY SCHOOL 2,422,500.00 2,422,500.00 EXPANSION OF COVERAGE OF ABOT ALAM PROGRAM FOR OSY 850,000.00 850,000.00 VARIOUS DILG PROJECTS 3,785,000.00 3,785,000.00 REHABILITATION/UPGRADING OF LANDAYAN-PATULANG FMR - REHABILITATION/UPGRADING OF UPPER LUMABAT FMR - IMPROVEMENT OF TRANSPORT TERMINAL - PURCHASE OF 4X4 RESCUE VEHICLE - SALINTUBIG WATER SYSTEM AT SITIO DANAO, TAMBAN 1,190,000.00 1,190,000.00 SALINTUBIG WATER SYSTEM AT TIPAK & INUMPAAN, UPPER LUMABAT 1,445,000.00 1,445,000.00 COMPLETION OF MAIN HEALTH CENTER 4,250,000.00 4,250,000.00 CONSTRUCTION OF MALUNGON GAMAY BARANGAY HEALTH STATION 1,275,000.00 1,275,000.00 PURCHASE OF HEALTH EQUIPMENTS FOR MALUNGON GAMAY BARANGAY HEALTH STATION 407,700.00 407,700.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS LIVELIHOOD (TRIBAL DRESS WEAVING) PROJECT INCLUDING WEAVING MATERIALS AND MACHINE EQUIPMENTS 425,000.00 425,000.00 VARIOUS DSWD PROJECTS 781,300.00 781,300.00 CONSTRUCTION OF MULTI-PURPOSE EVACUATION AND TRAINING CENTER - CONSTRUCTION OF CRISIS INTERVENTION CENTER - INDUSTRY CLUSTERING DEVELOPMENT PRGRAM 467,500.00 467,500.00 SKILLS TRAINING ON DRESS MAKING AND FOOD PROCESSING FOR WOMEN 1,275,000.00 1,275,000.00 SKILLS TRAINING ON WEILDING FOR PANTAWID PAMILYA BENEFICIARIES 850,000.00 850,000.00 SOUTH COTABATO 64,999,079.20 - 2,500,000.00 11,491,100.80 45,660,190.00 - 6,734,000.00 5,415,000.00 6,533,845.00 46,158,860.00 14,724,630.00 4,000,000.00 6,405,200.00 2,378,095.00 217,000,000.00 1419 BANGA 8,470,000.00 - - - 900,000.00 - - 1,000,000.00 - 1,800,000.00 - - 2,330,000.00 - 14,500,000.00 VARIOUS DA PROJECTS 8,470,000.00 8,470,000.00 PROVISION OF TWO (2) UNITS TRATOR WITH KUBOTA ROTAVATORS AND TRAILERS - PROVISION OF TWO 2 UNITS TRESHER AND 2 UNITS SHELLER - SOLAR DRIER - LIVELIHOOD PROJECT (CARABAO DISPERSAL/RE-DISPERSAL) - VEGETABLE PRODUCTION - ESTABLISHMENT OF 1 UNIT FEED MILL FOR TILAPIA, LIVESTOCK & POULTRY - ESTABLISHMENT OF 1 UNIT FOOD PROCESSING FACILITY FOR FISH & CORN - ESTABLISHMENT OF COMPOSTING FACILITY FOR ORGANIC FERTILIZER PRODUCTION & PROVISION OF HAULER - WATER SYSTEM (SALINTUBIG) 900,000.00 900,000.00 WEAVING (CULTURAL DRESS) 500,000.00 500,000.00 T-SHIRT PRINTING 500,000.00 500,000.00 SKILLS TRAINING WITH STARTER KIT (MEAT PROCESSING (TOCINO, CHORIZO & EMBUTIDO), BSKING (CAKES & PASTRIES); SEWING (CURTAIN) & HANDICRAFT (SLIPPERS & FASHION ACCESSORIES) 1,800,000.00 1,800,000.00 MEAT/FOOD PROCESSING (TOCINO, CHORIZO & EMBUTIDO); COSMETOLOGY/BEAUTY CARE; HANDICRAFTS (BAG & FASHION ACCESSORIES MAKING) & SEWING/DRESSMAKING (CURTAIN & PILLOWCASE MAKING) 2,330,000.00 2,330,000.00 1420 CITY OF KORONADAL (CAPITAL) 5,604,000.00 - - - 2,800,000.00 - 3,534,000.00 - 1,503,845.00 5,330,060.00 2,000,000.00 - - 1,728,095.00 22,500,000.00 ORGANIC VEGETABLE PRODUCTION WITH TRAININGS AND SUPPORT FACILITIES FOR ORGANIC FERTILIZER PRODUCTION 594,000.00 594,000.00 CONDUCT CONTINUING HANDS ON VEGETABLE AND RICE INTERNAL CONTROL SYSTEM (ICS) WITH DEMONSTRATION FARMS 1,000,000.00 1,000,000.00 ESTABLISHMENT OF ECONOMIC BUSINESS CENTER (TRADING POST) WITH STORAGE FACILITY 2,000,000.00 2,000,000.00 TRAININGS ON HVCC - CACAO AND COFFEE WITH PROVISION OF PLANTING MATERIALS 660,000.00 660,000.00 POST HARVEST FACILITIES AND EQUIPMENT IN SUPPORT TO ORGANIC FARMING 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION WITH CAPABILITY BUILDING (SENIOR CITIZENS) 350,000.00 350,000.00 RESCUE VAN WITH EQUIPMENT 1,300,000.00 1,300,000.00 CONSTRUCTION OF WATER SYSTEM 1,500,000.00 1,500,000.00 RENOVATION/EXPANSION OF BARANGAY HEALTH STATION (BHS) 2,534,000.00 2,534,000.00 UPGRADING OF MEDICAL EQUIPMENT FOR BARANGAY HEALTH STATION (BHS) 1,000,000.00 1,000,000.00 DEVELOPMENT OF SIOK WATERFALLS FOREST ADVENTURE AS A COMMUNITY BASED ECO TOURISM DESTINATION 1,503,845.00 1,503,845.00 SUSTAINABLE LIVELIHOOD PROGRAM: PROVISION OF LIVELIHOOD OPPORTUNITIES AND CONDUCT CAPABILITY BUILDING, SKILLS TRAINING ON BEAUTY CULTURE, FRUIT AND PROCESSING. T-SHIRT PRINTING, DISHWASHING & FABRIC CONDITIONER MAKING. 1,750,000.00 1,750,000.00 VARIOUS DSWD PROJECTS 3,580,060.00 3,580,060.00 CONSTRUCTION OF DAY CARE CENTER - ESTABLISHMENT OF BAHAY PAG-ASA FOR CHILDREN IN CONFLICT WITH LAW(CIC) OR YOUTH HOME - BAMBOO INDUSTRY DEVELOPMENT 2,000,000.00 2,000,000.00 CONSTRUCTION OF ROADS 1,728,095.00 1,728,095.00 1421 GENERAL SANTOS CITY 1,576,680.00 - - - 17,226,690.00 - - - - 8,100,000.00 3,096,630.00 - - - 30,000,000.00 TECHNO-DEMO ESTABLISHMENT FOR THE PRODUCTION AND FOOD UTILIZATION OF OPV/HYBRID WHITE CORN AS STAPLE FOOD FOR FILIPINOS NEXT TO RICE 1,156,680.00 1,156,680.00 ESTABLISHMENT AND DEPLOYMENT OF ARTIFICIAL REEF DOMES 420,000.00 420,000.00 VARIOUS DILG PROJECTS 17,226,690.00 17,226,690.00 CONSTRUCTION OF DEEP WELL WITH OVERHEAD TANK(DW/0T) - CONSTRUCTION OF DEEP WELL WITH OVERHEAD TANK(DW/0T) WITH ELECTRICAL COMPONENTS - UPGRADING OF SUBMERSIBLE PUMP AND INSTLLATION OF LEVEL II PIPELINES, WITH ELECTRICAL COMPONENTS - CONSTRUCTION OF DEEP WELL WITH OVERHEAD TANK(DW/0T) - CONSTRUCTION OF DEEP WELL W/ OH (DW/0T) W/ ELECTRICAL COMPONENTS - CONSTRUCTION OF DEEP WELL AND OH TANK AND INSTALLATION OF LEVEL 2 PIPELINE - COMPLETION OF DEEP WEEL AND OH TANK AND INSTALLMENT OF LEVEL 2 PIPELINE - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF DEEP WELL AND OH TANK - CONSTRUCTION OF DEEP WELL/OVERHEAD TANK AND ACCESSORIES - CONSTRUCTION OF DEEP WELL/OVERHEAD TANK - IMPROVEMENT OF WATER SYSTEM AND INSTALLATION OF PIPELINE(LEVEL II) - IMPROVEMENT OF WATER SYSTEM AND INSTALLATION OF PIPELINE(LEVEL II) - IMPROVEMENT/REHABILITATION OF WATER SYSTEM - INSTALLATION OF WATER SYSTEM WITH OH AND PIPELINES AND ACCESSORIES - CONSTRUCTION OF WATER SYSTEM(DW10T) - IMPROVEMENT OF WATER SYSTEM AND INSTALLATION OF PIPELINE(LEVEL II) - SKILLS TRAINING (FOOD PROCESSING ) WITH STARTER KIT FOR BRGY. WOMEN'S FEDERATION AND PRE-IDENTIFIED INDIGENT FAMILIES 1,560,000.00 1,560,000.00 VARIOUS DSWD PROJECTS 6,540,000.00 6,540,000.00 COMPLETION OF RESIDENTIAL FACILITY (BAHAY PAG-ASA) WITH CICL ACTIVITY AREA TO INCLUDE INSTALLATION OF WATER SYSTEM; ELECTRICAL SERVICE ENTRANCE CONSTRUCTION WITH TRANSFORMER AND PERIMETER - CONSTRUCTION OF DAY CARE CENTERS- - IMPROVEMENT AND REPAIR OF MODEL SENIOR CITIZEN CENTER TO INCLUDE PERIMETER FENCE - YAMANG PINOY- PRODUCT QUALITY AND SAFETY AWARENESS PROJECT 660,630.00 660,630.00 DEVELOPING MICRO SMALL AND MEDIUM ENTERPRISES THROUGH YAMAN PINOY AND INDUSTRY CLUSTERING 1,500,000.00 1,500,000.00 COMMUNITY ENTERPRISE DEVELOPMENT FOR URBAN POOR FAMILIES ON PROCESSED FOOD 936,000.00 936,000.00 1422 LAKE SEBU 11,000,000.00 - - - 3,500,000.00 - 1,000,000.00 - 1,600,000.00 4,500,000.00 1,700,000.00 2,000,000.00 1,200,000.00 - 26,500,000.00 POST HARVEST FACILITIES & EQUIPMENT 500,000.00 500,000.00 TRADING POST (BAGSAKAN) 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD & OTHER AGRI- FISHERY BUSINESS INVESTMENT 2,000,000.00 2,000,000.00 AGRI-FISHERY TRAINING* HATCHERY PRODUCTION 500,000.00 500,000.00 INFRA SUPPORT 7,500,000.00 7,500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) 3,000,000.00 3,000,000.00 CAPACITY BUILDING FOR CSOS 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM TB DOTS CENTER 1,000,000.00 1,000,000.00 PLANNING, PRODUCT DEV'T. MARKETING STANDARDS & LOCAL REGISTRATION 600,000.00 600,000.00 PRODUCTION OF PROMO COLLATERALS 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM MICRO-ENTERPRISES PROGRAM CAPITAL ASSISTANCE & LIVELIHOOD 1,000,000.00 1,000,000.00 PROTECTIVE SERVICES INFRASTRUCTURE -CONSTRUCTION OF DAY CARE CENTER 1,500,000.00 1,500,000.00 BASIC EDUCATION FACILITIES 1,000,000.00 1,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE/ ACCESS EDUC./ ABOT ALAM PROGRAM 1,000,000.00 1,000,000.00 YAMAN PINOY (SKILLS TRAINING,PRODUCTION DEVELOPMENT, MARKETING) 700,000.00 700,000.00 INDUSTRY CLUSTERING DEV'T. PROJ. 1,000,000.00 1,000,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 2,000,000.00 2,000,000.00 SKILLS TRAINING ON FOOD PROCESSING 700,000.00 700,000.00 SKILLS TRAINING ON AUTOMOTIVE AND WELDING 500,000.00 500,000.00 1423 NORALA 648,000.00 - - 2,080,000.00 2,922,000.00 - - 900,000.00 630,000.00 4,600,000.00 720,000.00 - - - 12,500,000.00 ESTABLISHMENT OF ORGANIC DEMO FARM 648,000.00 648,000.00 REPAIR OF SCHOOL BUILDING 500,000.00 500,000.00 PROVISION OF SCHOOL FURNITURES (CHAIRS) 700,000.00 700,000.00 GULAYAN SA PAARALAN 380,000.00 380,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO PROMOTE ACCESS TO EDUCATION/ALS (ABOT ALAM PROGRAM) 500,000.00 500,000.00 PURCHASE OF DISASTER RESCUE EQUIPMENT 900,000.00 900,000.00 FLOOD CONTROL PROGRAM (REPAIR AND REHABILITATION OF CANALS AND DRAINAGE SYSTEM) 1,522,000.00 1,522,000.00 CAPACITY BUILDING FOR CIVIL SOCIETY ORGANIZATIONS (CSOS) 500,000.00 500,000.00 DOLE KABUHAYAN STARTER KIT/NEGO KART PROJECT 900,000.00 900,000.00 LOCAL TOURISM PRODUCT DEVELOPMENT PROJECT 630,000.00 630,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICRO ENTERPRISE FACILITATION DEVELOPMENT (1ST TRACK) 900,000.00 900,000.00 YOUTH WELFARE PROGRAM - TARPAULIN PRINTING 900,000.00 900,000.00 IMPROVEMENT OF WOMEN CRISIS CENTER 900,000.00 900,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY 500,000.00 500,000.00 PROVISION OF HYGIENE KITS/MATERIALS IN ALL DAY CARE CENTERS 500,000.00 500,000.00 REHABILITATION OF SENIOR CITIZEN BUILDINGS 900,000.00 900,000.00 INDUSTRY CLUSTER DEVELOPMENT FOR PROCESSED FOODS (KAKANIN) 720,000.00 720,000.00 1424 POLOMOLOK 11,000,000.00 - 2,000,000.00 2,000,000.00 1,000,000.00 - - 2,000,000.00 - 1,000,000.00 1,500,000.00 - - - 20,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION DEVELOPMENT 5,000,000.00 5,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI FSIHERY BUSINESS INVSETMENT 1,000,000.00 1,000,000.00 COLD STORAGE FACILITIES / VAN 1,500,000.00 1,500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 1,500,000.00 1,500,000.00 IRRIGATION PROJECT 2,000,000.00 2,000,000.00 REFORESTATION PROGRAM ON MT. MATUTUM PROTECTED AREAS, GULLEYS AND RIVER BANKS 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CLASSROOM REPAIR/REHABILITATION AND FURNITURE OM PUBLIC ELEMENTARY AND SECONDARY SCHOOLS 1,000,000.00 1,000,000.00 ABOT-ALAM PROGRAM 1,000,000.00 1,000,000.00 SAGANA AT LIGTAS NA TUBIG PARA SA LAHAT ( SALINTUBIG ) REHABILITATION OF WATER SYSTEM 1,000,000.00 1,000,000.00 OFW'S REINTEGRATION PROGRAM ( ENTREPRENEURSHIP ) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 COMMUNITY EMPLOYMENT & LIVELIHOOD PROGRAM ( CELP ): LIVELIHOOD BAG MAKING, HANDICRAFT, FOOD PROCESSING, MARKETING 1,000,000.00 1,000,000.00 LIVELIHOOD PROGRAM FOR PWDS/ENTERPRENEURSHIP DEVELOPMENT 1,000,000.00 1,000,000.00 INDIGENOUS CRAFTS DEVELOPMENT 500,000.00 500,000.00 1425 SANTO NINO 6,813,899.20 - - 1,591,100.80 - - - 975,000.00 900,000.00 1,500,000.00 720,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 6,813,899.20 6,813,899.20 FARM IMPLEMENTS - RICE TRANSPLANTER - ACQUISITION OF PRE-HARVEST FACILITIES SUCH AS HAND TRACTOR (KULIGLIG), TRAILER W/ POWER TRANSMISSION, TURTLE TILLER, GRASS SHREDDER AND FLAT DRYER - AGRICULTURAL MACHINERIES SUCH AS PRE AND POST HARVEST FACILITIES (RICE COMMODITY) - CONSTRUCTION OF SLAUGHTER HOUSE - CONSTRUCTION OF TRADING POST - REPAIR OF SCHOOL BUILDING (7 SCHOOLS AMBALGAN ES, CAJANEDO ES, KATIPUNAN ES, M.ROXAS ES, SAN ISIDRO ES, SNCES AND TERESITA) 630,000.00 630,000.00 REPAIR OF THREE (3) SCHOOL BUILDINGS COMPOSED OF 26 CLASSROOMS IN THREE (3) HIGH SCHOOLS 799,100.80 799,100.80 GULAYAN SA PAARALAN 162,000.00 162,000.00 ESTABLISHMENT OF TARPAULIN PRINTING SHOP 975,000.00 975,000.00 PRODUCT DEVELOPMENT CENTER 900,000.00 900,000.00 ENHANCEMENT OF SENIOR CITIZENS CENTER 500,000.00 500,000.00 REPAIR OF POBLACION-C DCC AND EXPANSION OF POBLACION-B DCC 500,000.00 500,000.00 RENOVATION OF AMBALGAN DCC AND EXTENSION OF SUPERVISED NEIGHBORHOOD PLAY BUILDING 500,000.00 500,000.00 GARMENT MAKING INDUSTRY 720,000.00 720,000.00 1426 SURALLAH 2,700,000.00 - - - 3,200,000.00 - 2,200,000.00 - - 5,250,000.00 500,000.00 - - 650,000.00 14,500,000.00 CONST. OF MULTI PURPOSE DRYING PAVEMENT WITH MINI WAREHOUSE 700,000.00 700,000.00 CONST. OF MULTI PURPOSE DRYING PAVEMENT WITH MINI WAREHOUSE 700,000.00 700,000.00 ESTABLISHMENT OF BIOLOGICAL CONTROL AGENT PLANT/LAB. 1,300,000.00 1,300,000.00 UPGRADING OF NACI WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM 1,350,000.00 1,350,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM 1,350,000.00 1,350,000.00 RENOVATION OF RURAL HEALTH UNIT OF SURALLAH (MAIN CENTER) 850,000.00 850,000.00 REPAIR OF BARANGAY HEALTH STATION 650,000.00 650,000.00 REPAIR OF BARANGAY HEALTH STATION 700,000.00 700,000.00 CONSTRUCTION OF BAHAY PAG-ASA FOR CICL 3,000,000.00 3,000,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 CONSTRUCTION OF OFFICE OF PERSONS WITH DISABILITY AFFAIRS 500,000.00 500,000.00 CONSTRUCTION OF DAY CENTER 1,000,000.00 1,000,000.00 SUPPORT TO FOOD INDUSTRY CLUSTER DEVELOPMENT PEANUT PROCESSING 500,000.00 500,000.00 CONCRETING OF COLONGULO-BUENAVISTA ROAD 650,000.00 650,000.00 1427 TAMPAKAN 3,986,500.00 - - - 1,611,500.00 - - 540,000.00 - 4,164,000.00 2,198,000.00 - - - 12,500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVEHOOD PROGRAM 932,500.00 932,500.00 ORGANIC AGRIBUSINESS (ESTABLISHMENT OF VERMI-FACILITIES FOR ORGANIC FERTILIZER AND VEGETABLE PRODUCTION) 504,000.00 504,000.00 CONSTRUCTION OF TRADING POST WITH COLD STORAGE FACILITIES FOR VEGETABLES & FRUITS 2,550,000.00 2,550,000.00 VARIOUS DILG PROJECTS 1,611,500.00 1,611,500.00 EXPANSION/COMPLETION OF KIPALBIG POTABLE WATER SYSTEM - CONSTRUCTION OF MALTANA POTABLE WATER SYSTEM - LIVELIHOOD STARTER KITS (30 INDIVIDUALS @ 300THOU AND 2 GROUPS @ 300THOU EACH GROUP) 540,000.00 540,000.00 CONSTRUCTION OF DAY CARE CENTERS (SAN ISIDRO I & MEDALLA MILAGROSA) WITH FACILITIES 667,926.40 667,926.40 REPAIR OF CLASSROOM (TAPLAN ES, LIBERTY NHS, TNHS, LAMBAYONG ES, DANLAG NHS) 1,336,400.00 1,336,400.00 LIVELIHOOD PROJECTS FOR WOMEN, ELDERLY, PWD SECTOR AND OTHER LESS PRIVILEGED SECTORS 566,400.00 566,400.00 SKILLS TRAINING PROGRAM - CONDUCT OF SKILLS TRAINING SESSIONS AND COMPETENCY ASSESSMENT 1,593,273.60 1,593,273.60 TECHNOLOGY DEVELOPMENT & UPGRADING OF BAMBOO BASED CRAFTS/PRODUCTS/ENGINEERED BAMBOO 1,190,000.00 1,190,000.00 TECHNOLOGY AND PRODUCTIVITY UPGRADING 504,000.00 504,000.00 MSMES SKILLS TRAINING AND PRODUCTION ENHANCEMENT SUPPORT PROGRAM 504,000.00 504,000.00 1428 TANTANGAN - - - - 5,900,000.00 - - - - 3,234,800.00 2,290,000.00 - 1,075,200.00 - 12,500,000.00 IMPROVEMENT OF PWS 1,000,000.00 1,000,000.00 INSTALLATION OF PWS 1,000,000.00 1,000,000.00 EXPANSION OF PWS 3,000,000.00 3,000,000.00 FLOOD CONTROL PROJECTS 900,000.00 900,000.00 VARIOUS DSWD PROJECTS 2,349,200.00 2,349,200.00 CONSTRUCTION OF DAY CARE CENTER - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF DAY CARE CENTER - CONSTRUCTION OF DAY CARE CENTER - CLASSROOM REPAIRS 669,600.00 669,600.00 GULAYAN SA PAARALAN 216,000.00 216,000.00 MEAT AND FOOD PROCESSING 535,000.00 535,000.00 BAMBOO PRODUCTS DEVELOPMENT 1,755,000.00 1,755,000.00 PROJECT MONITORING AND EVALUATION - SKILLS TRAINING FOR OSY 1,075,200.00 1,075,200.00 1429 T'BOLI 11,700,000.00 - - 2,300,000.00 5,100,000.00 - - - 1,400,000.00 3,700,000.00 - - 800,000.00 - 25,000,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENT 9,700,000.00 9,700,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 1,500,000.00 1,500,000.00 INFRASTRUCTURE SUPPORT TO AGR AND FISHERY PRODUCTION AND DEVELOPMENT 500,000.00 500,000.00 SCHOOL BUILDING REPAIRS 1,800,000.00 1,800,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 SALINTUBIG-PROVISION OF POTABLE WATER SUPPLY 5,100,000.00 5,100,000.00 LAMHAKU HOT SPRING ECO-TOURISM DEVELOPMENT 1,400,000.00 1,400,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS 3,700,000.00 3,700,000.00 TECHNICAL VOCATION TRAINING/COMMUNITY-BASED TRAINING 800,000.00 800,000.00 1430 TUPI 1,500,000.00 - 500,000.00 3,520,000.00 1,500,000.00 - - - 500,000.00 2,980,000.00 - 2,000,000.00 1,000,000.00 - 13,500,000.00 VARIOUS DA PROJECTS 1,500,000.00 1,500,000.00 PROCESSING FACILITIES/PLANT FOR TUPI RURAL FRUIT VENDORS ASSOCIATION INC - MUNICIPAL FOOD TERMINAL PROJECT - ORGANIC FERTILIZER PRODUCTION - SUPPORT TO THE ESTABLISHEMENT OF BIODIVERSITY CORRIDOR PROJECTS THROUGH NATIONAL GREENING PROGRAM (NGP) 500,000.00 500,000.00 BASIC EDUCATION FACILITIES PROVISION OF SCHOOL FURNITURE (SEATS) 2,240,000.00 2,240,000.00 BASIC EDUCATION FACILITIES REPAIR/REHABILITATION OF CLASSROOM 960,000.00 960,000.00 GULAYAN SA PAARALAN 320,000.00 320,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHATSALINTUBIG)-PROVISION OF POTABLE WATER SUPPLY 1,500,000.00 1,500,000.00 TARSIER VILLAGE ECO-CULTURAL TOURISM PRODUCT DEVELOPMENT (MT. MATUTUM BIODIVERSITY CORRIDOR) 500,000.00 500,000.00 PRODUCTIVE SERVICES-INFRASTRUCTURE PROJECTS (CONSTRUCTION OF BAHAY PAG-ASA) 1,350,000.00 1,350,000.00 PROVISION OF ECCD LEARNING MATERIALS FOR C\DCCS AND SUPERVISED NEIGHBORHOOD PLAYGROUPS 540,000.00 540,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICROENTERPRISE DEVELOPMENT TRACK (SEA-K) 550,000.00 550,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP)-MICROENTERPRISE DEVELOPMENT TRACK (4PS YOUTH) 540,000.00 540,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 2,000,000.00 2,000,000.00 TECHNICAL-VOCATIONAL TRAINING 1,000,000.00 1,000,000.00 SULTAN KUDARAT 54,788,341.50 - 6,878,177.85 26,847,764.80 28,952,413.35 540,000.00 14,513,400.00 7,010,000.00 2,516,000.00 39,452,450.00 8,280,500.00 - 7,195,952.50 4,525,000.00 201,500,000.00 1431 BAGUMBAYAN 2,160,000.00 - - 700,000.00 12,600,000.00 - - 1,500,000.00 - 500,000.00 1,040,000.00 - - - 18,500,000.00 SUPPORT TO ORGANIC FERTILIZER 1,360,000.00 1,360,000.00 SUGARCANE VILLAGE TYPE PROCESSING 800,000.00 800,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION / ABOT ALAM PROGRAM 500,000.00 500,000.00 GULAYAN SA PAARALAN 200,000.00 200,000.00 VARIOUS DILG PROJECTS 4,600,000.00 4,600,000.00 CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF FOOTBRIDGE - CONSTRUCTION OF FOOTBRIDGE - CONSTRUCTION OF FOOTBRIDGE - CONSTRUCTION OF FOOTBRIDGE - LEVEL II POTABLE WATER SYSTEM 7,000,000.00 7,000,000.00 CONTINUED SUPPORT TO VARIOUS CSO THROUGH CAPACITY BUILDING (TRAINING FOR 100 CSO/PO/NGO - MONITORING & EVALUATION, MORAL RECOVERY & LEADERSHIP, FINANCVIAL MANAGEMENT & BOOKKEEPING, CONDUCT OF BARANGAY ASSEMBLIES, MUNICIPAL CSO/PO/NGO ASSEMBLY) 1,000,000.00 1,000,000.00 SKILLS TRAINING "CUM" LIVELIHOOD (STARTER KABUHAYAN KIT - RUBBER TAPPER, BEAUTICIAN, ELECTRICIAN, ELECTRONIC REPAIR SHOP, KALAKAT MARKET, BARBER, KAKANIN MAKER & VENDOR, BARBER, SHOE REPAIR, TARO & BANANA CHIPS MAKER, CARPENTER, BASKET & NIGO WEAVER, TSHIRT & STREAMER PRINTING, SUGARCANE WORKERS SKILLS TRAINING, ICE CREAM MAKER, PLANT/FLOWER PROPAGATOR, FIBER LEAVES DECORATION MAKER) 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) - MICROENTERPRISE 500,000.00 500,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM FOR PROCESSED FOOD/CRAFT & BAMBOO 540,000.00 540,000.00 CACAO/COFFEE PROCESSING 500,000.00 500,000.00 1432 COLUMBIO 4,683,010.00 - 422,540.00 - - - - - - 7,394,450.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 4,683,010.00 4,683,010.00 CONSTRUCTION OF MINI WAREHOUSE WITH MULTI- PURPOSE DRYING PAVEMENT (MPDP) - PROVISION OF CORN SHELLER AND TRACTOR WITH TILLER - CONSTRUCTION OF MINI WAREHOUSE WITH MULTI- PURPOSE DRYING PAVEMENT (MPDP) - INFRA SUPPORT (RICE TRESHER AND CORN SHELLER) - CONSTRUCTION OF SOLAR DRYER - CONSTRUCTION OF SOLAR DRYER - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF SOLAR DRYER - REHAB OF NEWILOCOS SWIP - CONSTRUCTION OF SOLAR DRYER - ESTABLISHMENT OF NURSERY (RUBBER, CACAO, COFFEE, CALAMANSI, IPIL-IPIL AND VEGETABLES - RICE SEEDS FOR THIRD CROPPING - ACQUISITION OF SMALL RUMINANT (GOAT RAISING) - FOR DISTRIBUTION TO POOR FARMERS TO AUGMENT THEIR INCOME THROUGH LIVESTOCK (GOAT) RAISING AND SELLING - CONSTRUCTION OF SOLAR DRYER - GREENING PROGRAM (RUBBER DISPERSAL) 422,540.00 422,540.00 CONSTRUCTION OF ONE (1) UNIT DAY CARE CENTER 633,810.00 633,810.00 CONSTRUCTION OF WOMEN AND CHILDREN CRISIS CENTER 1,267,620.00 1,267,620.00 REHAB OF POTABLE WATER SYSTEM LEVEL II 422,540.00 422,540.00 REHAB OF POTABLE WATER SYSTEM 422,540.00 422,540.00 REHAB OF POTABLE WATER SYSTEM LEVEL II 845,080.00 845,080.00 CONSTRUCTION OF BOX CULVERT 422,540.00 422,540.00 REHAB OF WATER SYSTEM LEVEL II 845,080.00 845,080.00 FLOOD PROTECTION DIKE 1,690,160.00 1,690,160.00 CONSTRUCTION OF MARKET DRAINAGE 845,080.00 845,080.00 1433 ESPERANZA 3,000,000.00 - 2,000,000.00 1,500,000.00 - - 1,500,000.00 500,000.00 - 1,000,000.00 - - 500,000.00 2,500,000.00 12,500,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 3,000,000.00 3,000,000.00 NATIONAL GREENING PROGRAM (NGP) 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES 500,000.00 500,000.00 BASIC EDUCATION FACILITIES 500,000.00 500,000.00 BASIC EDUCATION FACILITIES 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,500,000.00 1,500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS COMMUNITY ENTERPRISE PROJECTS FOR INFORMAL WORKER 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE 1,000,000.00 1,000,000.00 CORE LOCAL ROAD CONSTRUCTION 2,500,000.00 2,500,000.00 TECHNICAL VOCATIONAL TRAINING/ COMMUNITY BASED TRAINING 500,000.00 500,000.00 1434 ISULAN (CAPITAL) 7,935,000.00 - 1,860,000.00 272,000.00 - - - - - 4,403,000.00 - - 1,030,000.00 - 15,500,000.00 VARIOUS DA PROJECTS 7,935,000.00 7,935,000.00 PROVISION OF FARM MACHINERIES (5 UNITS COMBINED HARVESTER) - ESTABLISHMENT OF TRADING POST OF PROCESSED PRODUCTS (PASALUBONG CENTER) - PROVISION OF FARM MACHINERIES (1 UNIT FARM ROTAVATOR) - UPLAND GREENING PROGRAM (RUBBER & COFFEE) 1,360,000.00 1,360,000.00 ALLAH RIVER RIPARIAN PROTECTION 500,000.00 500,000.00 GULAYAN SA PAARALAN (ELEMENTARY AND SECONDARY SCHOOL) 272,000.00 272,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SKILLS TRAINING & CAPITAL SEED FUND) 1,428,000.00 1,428,000.00 UPGRADING/REPAIR OF DAY CARE CENTER 1,530,000.00 1,530,000.00 CHILD MINDING CENTER 1,445,000.00 1,445,000.00 SKILLS TRAINING/SCHOLARSHIP PROGRAM (BUTCHER, MASSGE THERAPY, MASONRY, COSMETOLOGY, BUILDING AND WIRING CONSTRUCTION) 1,030,000.00 1,030,000.00 1435 KALAMANSIG 2,510,000.00 - - 4,740,000.00 4,000,000.00 - - - - 2,000,000.00 2,250,000.00 - - - 15,500,000.00 CONSTRUCTION OF 16MX30M MULTI-PURPOSE PAVEMENT 500,000.00 500,000.00 PURCHASE OF 200 UNITS SPRAYER 500,000.00 500,000.00 CONSTRUCTION OF 16MX30M MULTI-PURPOSE DRYING PAVEMENT 500,000.00 500,000.00 ESTABLISHMENT OF DEEP SEA FISHING SHELTER "PAYAO" 510,000.00 510,000.00 PURCHASE OF FIVE (5) UNITS MOTORIZED BANCA 500,000.00 500,000.00 REPAIR AND REHABILITATION OF CLASSROOM BUILDING 1,000,000.00 1,000,000.00 ACQUISITION OF ARM CHAIRS 1,050,000.00 1,050,000.00 REPAIR AND REHABILITATION OF THREE (3) CLASSROOMS OF STA. CLARA NATIONAL HIGH SCHOOL 1,050,000.00 1,050,000.00 GULAYAN SA PAARALAN 140,000.00 140,000.00 REPAIR AND REHABILITATION OF SCHOOL BUILDING 500,000.00 500,000.00 PROVISION OF FURNITURE (ARM CHAIRS & TEACHERS' TABLES) 500,000.00 500,000.00 REHABILITATION AND REPAINTING OF CLASSROOM BUILDING 500,000.00 500,000.00 CONSTRUCTION OF SEAWALL 500,000.00 500,000.00 CONSTRUCTION OF DRAINAGE CANAL (FLOOD CONTROL) 1,000,000.00 1,000,000.00 CONSTRUCTION OF CONCRETE DRAINAGE CANAL 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY (WATER SYSTEM LEVEL II) 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY LEVEL II 500,000.00 500,000.00 SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) PROVISION OF POTABLE WATER SUPPLY LEVEL II 500,000.00 500,000.00 CIVIL SOCIETY ORGANIZATION (CSO) CAPABILITY BUILDING 500,000.00 500,000.00 REHABILITATION OF DAY CARE CENTER 500,000.00 500,000.00 CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN CONFLICT WITH THE LAW 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER 500,000.00 500,000.00 FORMULATION OF MUNICIPAL INVESTMENT PLAN 250,000.00 250,000.00 FORMULATION OF INVESTMENT/INCENTIVE CODE 250,000.00 250,000.00 FORMULATION OF ECONOMIC DEVELOPMENT PLAN 250,000.00 250,000.00 STREAMLINING BUSINESS PERMIT AND LICENSING SYSTEM 250,000.00 250,000.00 SECTORAL/PRODUCT DEVELOPMENT ACTION PLAN 250,000.00 250,000.00 ESTABLISHMENT OF OTOP STORE 1,000,000.00 1,000,000.00 1436 LAMBAYONG (MARIANO MARCOS) 5,117,547.50 - - 4,894,800.00 1,062,500.00 - - - - 2,167,500.00 850,000.00 - 2,407,652.50 - 16,500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS VARIOUS DA PROJECTS 3,417,547.50 3,417,547.50 INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT (HAND TRACTOR) - POST HARVEST FACILITIES AND EQUIPMENT (MULTI-PURPOSE DRYING PAVEMENT) - TRADING POST (AGRICULTURAL DISPLAY CENTER) - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI- FISHERY BUSINESS INVESTMENTS A) SWINE PRODUCTION, B) CATTLE PRODUCTION 1,275,000.00 1,275,000.00 AGRI-FISHERY TRAININGS A) TRAINING IN VERMI COMPOSTING, B)TRAINING ON MEAT & FISH PROCESSING, C) TRAINING ON RICE PRODUCTION 425,000.00 425,000.00 SCHOOL FURNITURE (ARMCHAIR) 1,080,400.00 1,080,400.00 GULAYAN SA PAARALAN 289,000.00 289,000.00 ABOT ALAM PROGRAM 975,400.00 975,400.00 REPAIR/REHAB OF E/S 2,550,000.00 2,550,000.00 CONSTRUCTION OF CANALS/DRAINAGE 1,062,500.00 1,062,500.00 LIVELIHOOD PROGRAM (BIGASAN NI LOLO AT LOLA) 1,275,000.00 1,275,000.00 COSNTRUCTION OF DAYCARE CENTERS 892,500.00 892,500.00 INDUSTRY SUPPORT PROGRAM FOR DEVELOPMENT OF PROCESSED FOODS (VEGETABLES, BANANA, CALAMANSI, MUSCOVADO) 425,000.00 425,000.00 INDUSTRY SUPPORT PROGRAM FOR DEVELOPMENT OF CRAFTS (PANDAN, CORN HUSK) 425,000.00 425,000.00 SKILLS TRAINING A. MOTORCYCLE/SMALL ENGINE SERVICING NC II 803,250.00 803,250.00 SKILLS TRAINING B. BREAD AND PASTRY PRODUCTION NC II 684,532.50 684,532.50 SKILLS TRAINING C. AUTOMOTIVE SERVICING NC II 919,870.00 919,870.00 1437 LEBAK 7,715,000.00 - 1,224,137.85 5,345,964.80 1,599,397.35 - 3,248,000.00 2,210,000.00 - 2,657,500.00 500,000.00 - - - 24,500,000.00 POST-HARVEST FACILITIES AND EQUIPMENT (MULTI-PURPOSE DRYING PAVEMENT) 1,600,000.00 1,600,000.00 COMMUNITY-BASED POST HARVEST AND COFFEE PROCESSING FACILITIES 850,000.00 850,000.00 DISTRIBUTION OF FISHING NETS AND MOTORIZED BANCAS FOR FISHERY PROJECTS 1,960,000.00 1,960,000.00 IRRIGATION PROJECT (SIP/STW) REHABILITATION AND MAINTENANCE 1,200,000.00 1,200,000.00 PROVISION OF SUSTAINABLE AGRI-BASED PLANTING MATERIALS 1,405,000.00 1,405,000.00 ESTABLISHMENT OF VERMI FACILITY FOR ORGANIC FERTILIZER PRODUCTION 700,000.00 700,000.00 REHAB OF RIVERBANKS 500,000.00 500,000.00 AGRO FORESTRY DEVELOPMENT 724,137.85 724,137.85 REPAIR OF CLASSROOM 950,164.80 950,164.80 ACQUISITION OF SCHOOL FURNITURES (SEATS) 500,000.00 500,000.00 GULAYAN SA PAARALAN 100,000.00 100,000.00 ACQUISITION OF SCHOOL FURNITURES (SEATS) 1,885,800.00 1,885,800.00 GULAYAN SA PAARALAN 110,000.00 110,000.00 ACQUISITION OF SCHOOL FURNITURES (SEATS) 509,600.00 509,600.00 REHABILITATION/REPAIR OF CLASSROOM 1,160,400.00 1,160,400.00 GULAYAN SA PAARALAN 130,000.00 130,000.00 SALINTUBIG (SPRING LEVEL II) - 75 - 100 HOUSEHOLDS BRGY. TRAN AND DATU KARON 1,599,397.35 1,599,397.35 HEALTH EMERGENCY MANAGEMENT (HEMS) 548,000.00 548,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM (HFEP) - RENOVATION OF KEYTODAC & BASAK BIRTHING CENTER, BIRTHING CENTER FOR BRGY. TRAN 1,700,000.00 1,700,000.00 INFECTIOUS DISEASES (SEXUALLY TRANSMITTED DISEASES AIDS- HIV) 500,000.00 500,000.00 MATERNAL, NEONATAL, CHULD HEALTH AND NUTRITION 500,000.00 500,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAM 1,700,000.00 1,700,000.00 OFWREINTEGRATION PROGRAM (STARTER KITS FOR RETURNING OFWS AND THEIR DEPENDENTS, START-UP CAPITAL FOR 2 OFW FAMILY CIRCLE 510,000.00 510,000.00 LIVELIHOOD SKILL TRAINING ON DRESSMAKING & COSMETOLOGY FOR WOMEN ASSN - SLP 500,000.00 500,000.00 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT 1,157,500.00 1,157,500.00 PROTECTIVE SERVICES - CAPACITY BUILDING - 6-DAY CAPACITY BUILDING/TRAINING WORKSHOP OF 62 DAY CARE WORKERS ON THE ECCD CURRICULUM, TRAINING SEMINAR WORKSHOP OF 54 VOLUNTEERS TO EQUIP THEM IN CONDUCTING SESSION ON PARENT EFFECTIVENESS SERVICES (PES) 500,000.00 500,000.00 ELECTRIFICATION OF 57 HOUSES UNDER THE CORE SHELTER PROGRAM 500,000.00 500,000.00 INDUSTRY DEVELOPMENT PROGRAM FOR PROCESSED FOODS (FISH, COCONUT, COFFEE, BANANA, MEAT AND GDH [GIFTS, DECORS AND HOUSEWARES]) 500,000.00 500,000.00 1438 LUTAYAN 6,890,000.00 - - 3,094,000.00 900,000.00 - 1,530,000.00 - 816,000.00 4,250,000.00 510,000.00 - 510,000.00 - 18,500,000.00 SMALL WATER IMPOUNDING PROJECT 2,550,000.00 2,550,000.00 PROVISION OF FISHPORT 3,740,000.00 3,740,000.00 FARM IMPLEMENTS AND TOOLS 600,000.00 600,000.00 PROVISION/ACQUISITION OF SCHOOL FURNITURE 544,000.00 544,000.00 REHABILITATION/REPAIR OF 2 UNITS CLASSROOM 510,000.00 510,000.00 REPAIR/REHABILITATION OF 17 CLASSROOMS OF LUTAYAN DISTRICT II 1,020,000.00 1,020,000.00 REPAIR OF SCHOOL BUILDINGS & OTHER STRUCTURES OF LUTAYAN DISTRICT 1 1,020,000.00 1,020,000.00 VARIOUS DILG PROJECTS 900,000.00 900,000.00 RESCUE EQUIPMENT - CONSTRUCTION OF EVACUATION CENTER WITH FACILITIES - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF PLACENTA PIT AND EQUIPING OF 7 BARANGAY HEALTH STATIONS 1,530,000.00 1,530,000.00 ESTABLISHMENT OF VISITORS CENTER CUM PASALUBONG CENTER 816,000.00 816,000.00 CONSTRUCTION OF WOMEN'S CRISIS CENTER WITH COMPLETE FACILITIES 1,275,000.00 1,275,000.00 CONSTRUCTION OF 3 DAY CARE CENTERS WITH COMPLETE FACILITIES 2,975,000.00 2,975,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM FOR PROCESSED FOOD DEVELOPMENT PROJECTS (BANANA, FISH AND COCONUT) AND CRAFTS (BAMBOO, WATER HYACINTH AND PANDAN) 510,000.00 510,000.00 COMMUNITY-BASED TRAININGS 510,000.00 510,000.00 1439 PALIMBANG 9,722,700.00 - - 2,151,000.00 6,581,100.00 540,000.00 2,212,200.00 - - 5,760,000.00 1,008,000.00 - - 2,025,000.00 30,000,000.00 PROVISION OF FISHING GEARS AND PARAPHERNALIAS 2,134,800.00 2,134,800.00 AGRI-FISHERY TRNG, MARINE RESERVE AND FISH SANCTUARY- MARINE PROTECTED AREA 297,000.00 297,000.00 FARM IMPLEMENTS/TOOLS 1,350,000.00 1,350,000.00 CONSTRUCTION OF 3 UNITS DRYNG PAVEMENT 810,000.00 810,000.00 PROVISION OF BUDDED RUBBER SEEDLINGS 450,000.00 450,000.00 BUDWOOD GARDEN ESTABLISHMENT WITH RUBBER NURSERY 729,000.00 729,000.00 COFFEE PRODUCTION (ROBUSTA & ARABICA) 675,000.00 675,000.00 VEGETABLE PRODUCTION 59,400.00 59,400.00 PROVISION OF ASSORTED FRUIT SEEDLINGS 967,500.00 967,500.00 POST HARVEST FACILITIES & EQUIPMENT 2,250,000.00 2,250,000.00 BEF: REHABILITATION OF CLASSROOMS 900,000.00 900,000.00 BEF: PROVISION OF SCHOOL FURNITURES/ARMCHAIRS/TABLES 450,000.00 450,000.00 GULAYAN SA PAARALAN 342,000.00 342,000.00 ABOT ALAM PROGRAM 459,000.00 459,000.00 VARIOUS DILG PROJECTS 2,531,100.00 2,531,100.00 EVACUATION CENTER WITH FACILITIES - RESCUE EQUIPMENT - SALINTUBIG - PWS 4,050,000.00 4,050,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM 540,000.00 540,000.00 COMMUNITY HEALTH TEAM MOBILIZATION 450,000.00 450,000.00 CONSTRUCTION OF HEALTH CENTER W/ LYING-IN FACILITY 283,500.00 283,500.00 DENGUE CONTROL 17,100.00 17,100.00 LEPROSY 129,600.00 129,600.00 MALARIA CONTROL PROGRAM 270,000.00 270,000.00 MATERNAL, NEONATAL, CHILDHEALTH AND NUTRITION (MNCHN) 481,500.00 481,500.00 RABIES ELIMINATION 81,000.00 81,000.00 RN HEALS 360,000.00 360,000.00 STI/HIV AIDS PREVENTION 100,440.00 100,440.00 TB CONTROL PROGRAM 39,060.00 39,060.00 SUSTAINABLE LIVELIHOOD PROGRAM 810,000.00 810,000.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS 4,500,000.00 4,500,000.00 OROTECTIVE SERVICES CAPACITY BUILDING 450,000.00 450,000.00 INDUSTRY DEV'T PROGRAM FOR PROCESS FOOD (FISH, COCONUT, COFFEE, BANANA, & CRAFTS) 513,000.00 513,000.00 INDUSTRTY DEV'T OF HIGH VALUE CROPS (RUBBER, BAMBOO, COCONUT, NIPA, RATTAN) 495,000.00 495,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 675,000.00 675,000.00 CORE LOCAL ROAD (CONST/ MAINTENANCE/ REHABILITATION) 1,350,000.00 1,350,000.00 1440 PRESIDENT QUIRINO 1,455,084.00 - - 1,800,000.00 1,209,416.00 - 3,215,500.00 - - 2,970,000.00 500,000.00 - 1,350,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 1,455,084.00 1,455,084.00 PROVISION OF WORKING ANIMALS WITH FARM IMPLEMENTS - PROVIDED VERMI PLANT AND FACILITIES - REHABILITATION/REPAIR OF SIX (6) CLASROOMS 1,800,000.00 1,800,000.00 PROVISION OF RESCUE EQUIPMENT FOR MDRRM OFFICE 709,416.00 709,416.00 CAPACITY BUILDING FOR CSOS (CAPABILITY BUILDING ON ADVOCACY AND PEOPLE'S PARTICIPATION IN LOCAL GOVERNANCE) 500,000.00 500,000.00 CONSTRUCTION OF TWO (2) BARANGAY HEALTH STATION WITH COMPLETE FACILITIES 3,215,500.00 3,215,500.00 TRAINING ON EARLY CHILDHOOD CARE DEVELOPMENT CURRICULUM GUIDE FOR PRE-SCHOOL CHILDREN, TRAINING ON INDIGENOUS MATERIAL AND PARENT EFFECTIVENESS SERVICE 720,000.00 720,000.00 CONSTRUCTION OF THREE (3) DAY CARE CENTER 2,250,000.00 2,250,000.00 INDUSTRY CLUSTERING SUPPORT PROGRAM FOR PROCESSED FOODS (MUSCOVADO, & MUSCOVADO-BASED, POWDERED VEGGIES, MEAT, COCONUT) 500,000.00 500,000.00 SKILLS TRAINING ON WELDING, DRESSMAKING, BEAUTY CARE, NCH, COOKING 1,350,000.00 1,350,000.00 1441 SEN. NINOY AQUINO 1,700,000.00 - 871,500.00 1,420,000.00 1,000,000.00 - 1,607,700.00 500,000.00 1,700,000.00 2,000,000.00 1,120,000.00 - 580,800.00 - 12,500,000.00 SUSTAINABLE LIVELIHOOD-SWINE RAISING PRODUCTION 500,000.00 500,000.00 ESTABLISHMENT OF VERMI FACILITY FOR ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 PROVISION OF MULTI-PURPOSE DRYING PAVEMENT WITH WAREHOUSE 700,000.00 700,000.00 NATIONAL GREENING PROGRAM (FRUIT TRESS PRODUCTION (PHP 12,450.00/HECTARE INCLUDES THE COST OF PLANTING MATERIALS, SITE PREPARATION AND MONITORING AND SUPERVISION 871,500.00 871,500.00 REPAIR OF CLASSROOM: KULAMAN CENTRAL ELEMENTARY SCHOOL 300,000.00 300,000.00 REPAIR OF CLASSROOM: GAPOK CENTRAL ELEMENTARY SCHOOL 300,000.00 300,000.00 REPAIR OF CLASSROOM: GAPOK NATIONAL HIGH SCHOOL 200,000.00 200,000.00 REPAIR OF CLASSROOM: SENATOR NINOY AQUINO NATIONAL HIGH SCHOOL 200,000.00 200,000.00 GULAYAN SA PAARALAN 420,000.00 420,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF DRAINAGE CANAL 1,000,000.00 1,000,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 1,000,000.00 1,000,000.00 PROCUREMENT OF MEDICAL FACILITIES/EQUIPMENT 607,700.00 607,700.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DILP)-STARTER KIT PROJECT 500,000.00 500,000.00 CONSTRUCTION OF TOURISM INFORMATION CENTER WITH AMENITIES 1,000,000.00 1,000,000.00 ENTREPRENEURIAL SKILLS TRAINING AND PURCHASE OF BASIC EQUIPMENT 700,000.00 700,000.00 CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN CONFLICT WITH THE LAW 2,000,000.00 2,000,000.00 INDUSTRY DEVELOPMENT PROGRAM FOR PROCESSED FOOD ON HIGH VALUE CROPS 1,120,000.00 1,120,000.00 SKILLS TRAINING (FOOD PROCESSING & TAILORING) 580,800.00 580,800.00 1442 TACURONG CITY 1,900,000.00 - 500,000.00 930,000.00 - - 1,200,000.00 2,300,000.00 - 4,350,000.00 502,500.00 - 817,500.00 - 12,500,000.00 VARIOUS NIA PROJECTS 1,400,000.00 1,400,000.00 IRRIGATION PROJECT - PROVISION AND INSTALLATION OF TEN (10) UNITS SHALLOWTUBE WELLS (STW) WITH COMPLETE ACCESSORIES (ENGINE PUMP) - INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT A. PROVISION OF FIVE (5) UNITS HAND TRACTOR (POWER TILLER) - INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT B. PROVISION OF FOUR (4) UNITS MECHANICAL RICE PLANTER - INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION & DEVELOPMENT NC. PROVISION OF TWO (2) UNITS COMBINE HARVESTER - AGRI-FISHERY TRAINING - CONDUCT OF SEASON LONG FARMER FIELD SCHOOL (FFS) ON ORGANIC FARMING, PALAY CHECK, INTEGRATED PEST MANAGEMENT (IPM) 500,000.00 500,000.00 NATIONAL GREENING PROGRAM: SEEDLING PRODUCTION (BAMBOO AND FAST GROWING TREES) 500,000.00 500,000.00 PROVISION OF SCHOOL FURNITURE 600,000.00 600,000.00 GULAYAN SA PAARALAN 330,000.00 330,000.00 HEALTH FACILITY ENHANCEMENT PROGRAM: CONSTRUCTION OF BARANGAY HEALTH STATIONS WITH BIRTHING HOME AND WITH EQUIPMENT AND INSTRUMENTS 1,200,000.00 1,200,000.00 DOLE INTEGRATED LIVELIHOOD PROGRAMS (DILP) - LIVELIHOOD STARTER KITS OR NEGO-KARTS 1,400,000.00 1,400,000.00 PANGKABUHAYAN PROGRAM: SPECIAL PROGRAM FOR THE EMPLOYMENT OF STUDENTS (SPES) 900,000.00 900,000.00 SLP (SUSTAINABLE LIVELIHOOD PROGRAM) - CAPABILITY BUILDING PROGRAM, SKILLS TRAINING PROGRAM AND PROVISION OF SEED CAPITAL 4,350,000.00 4,350,000.00 INDUSTRY CLUSTERING DEVELOPMENT PROGRAM: HIGH VALUE CROPS, FOOD PROCESSING AND CRAFT (BAMBOO, COCONUT, BANANA, PALM OIL, CORN HUSK, MEAT AND WATER LILY) 502,500.00 502,500.00 COMMUNITY BASED TRAINING PROGRAM: MOTORCYCLE / SMALL ENGINE SERVICING (NC-II) 817,500.00 817,500.00 COTABATO PROVINCE 17,450,000.00 - - 950,000.00 2,000,000.00 - 4,500,000.00 - 1,500,000.00 1,500,000.00 1,200,000.00 - 900,000.00 - 30,000,000.00 1443 COTABATO CITY 17,450,000.00 - - 950,000.00 2,000,000.00 - 4,500,000.00 - 1,500,000.00 1,500,000.00 1,200,000.00 - 900,000.00 - 30,000,000.00 VARIOUS DA PROJECTS 17,450,000.00 17,450,000.00 AGRI-BASED LIVELIHOOD FOR HOUSEHOLDS OF FARMERS AND FISHERFOLKS (LIVELIHOOD PRODUCTION AND DEVELOPMENT) - URBAN LIVELIHOOD FOR WOMEN'S GROUPS, OUT OF SCHOOL YOUTHS AND IPS - PRODUCTIVITY RESOURCE CENTER CUM PRODUCT PROMOTION/DISPLAY CENTER (TRADING POST) - INFRASTRUCTURE SUPPORT FOR AQUACULTURE PRODUCTION (COLD STORAGE & ICE PLANT) - ENRICHMENT AND PROTECTION OF THE MANGROVE AREAS TO ENHANCE THE DEVELOPMENT OF SUSTAINABLE AQUA- MARINE RESOURCES AND BIODIVERSITY - GULAYAN SA BARANGAY (COMMUNAL VEGETABLE GARDEN) - LOCAL ECONOMIC DEVELOPMENT (NON-HALAL SLAUGHTERHOUSE) - CONSTRUCTION OF CHILLER ROOM FOR HALAL SLAUGHTERHOUSE - GULAYAN SA PAARALAN 450,000.00 450,000.00 ABOT - ALAM PROGRAM (ALTERNATIVE LEARNING SYSTEM) 500,000.00 500,000.00 FLLOD AND CALAMITY RESCUE EQUIPAGE FOR THE COTABATO CITY DISASTER RISK REDUCTION AND MANAGEMENT OFFICE 1,250,000.00 1,250,000.00 SALINTUBIG PROJECT (PROVISION OF WATER SYSTEM TO INTERIOR BARANGAYS - (LAST PHASE) 750,000.00 750,000.00 EXPANSION AND IMPROVEMENT OF EREGION XISTING BRGY. HEALTH CENTERS (BEMONC) 4,500,000.00 4,500,000.00 VISITOR'S INFORMATION CENTER WITH PRODUCTION OF PROMOTION COLLATERALS 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 SHARED SERVICE FACILITIES FOR VARIOUS (SSF'S) LIVELIHOOD INITIATIVES 1,200,000.00 1,200,000.00 SKILLS TRAINING FOR VARIOUS LIVELIHOOD INITIATIVES 900,000.00 900,000.00 CARAGA 240,122,942.27 14,276,440.00 24,501,550.00 31,383,600.00 363,972,719.62 700,000.00 45,854,409.99 9,286,469.00 22,200,000.00 103,746,885.38 66,428,862.74 1,000,000.00 10,354,471.00 70,540,650.00 1,004,369,000.00 AGUSAN DEL NORTE 25,927,910.00 2,100,000.00 7,210,000.00 2,370,000.00 55,778,300.00 - 5,150,000.00 2,615,269.00 3,700,000.00 28,200,000.00 14,708,350.00 - 2,340,171.00 17,400,000.00 167,500,000.00 1444 BUENAVISTA 6,900,000.00 - - - - - 600,000.00 - - - - - - 5,000,000.00 12,500,000.00 VARIOUS DA PROJECTS 6,900,000.00 6,900,000.00 CONSTRUCTION OF TRADING POST - FARM EQUIPMENT - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS PALAY TRADING - BANANA PLANTATION - RURAL HEALTH UNIT PLACEMENT PROGRAM 600,000.00 600,000.00 CONCRETING OF FMR (MACALANG P-5 - TACUB ROAD) 5,000,000.00 5,000,000.00 1445 BUTUAN CITY (CAPITAL) 3,984,560.00 - 2,960,000.00 1,220,000.00 4,600,000.00 - 1,780,000.00 1,615,269.00 - 4,600,000.00 7,000,000.00 - 1,340,171.00 900,000.00 30,000,000.00 VARIOUS DA PROJECTS 1,500,000.00 1,500,000.00 COMPREHENSIVE AGRO-FORESTRY DEVELOPMENT PROJECT: AGRICULTURAL FARM IMPLEMENTS COMPONENT - UPLAND RICE PRODUCTION - TILAPIA FISHPOND FOR 5 BARANGAYS 500,000.00 500,000.00 LIVESTOCK PRODUCTION/DISPERSAL (CATTLE, GOAT, NATIVE CHICKEN) 900,000.00 900,000.00 AMPAYON BARANGAY FOOD TERMINAL - ORGANIC VEGETABLE UNDER INNOVATIVE GREENHOUSE SYSTEM 1,084,560.00 1,084,560.00 COMPREHENSIVE AGRO-FORESTRY DEVELOPMENT PROJECT: FORESTRY FARM IMPLEMENTS COMPONENT 2,000,000.00 2,000,000.00 FARM MILLIONS OF TREES PROJECT 960,000.00 960,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 REPAIR/REHABILITATION OF CLASSROOMS 720,000.00 720,000.00 CONSTRUCTION & CONCRETING OF CANALS, DRAINAGE & PATHWAYS (COVERED) 600,000.00 600,000.00 WATER SPRING DEVELOPMENT EXPANSION 1,200,000.00 1,200,000.00 CONSTRUCTION AND REHABILITATION OF LEVEL 1 WATER SYSTEM 500,000.00 500,000.00 POTABLE WATER REFILLING STATION 600,000.00 600,000.00 POTABLE WATER (CAMAYAHAN) EXPANSION FROM LEMON TO PIGDAULAN 1,200,000.00 1,200,000.00 TRAINING FOR CSOS 500,000.00 500,000.00 ACCREDITATION OF BIRTHING FACILITY TO PHIC 500,000.00 500,000.00 BIRTHING CLINIC EQUIPMENT 500,000.00 500,000.00 TRAINING OF HEALTH PROVIDERS IN LIFE SAVING SKILLS 780,000.00 780,000.00 NEGO-CART FOR 24 ASSOCIATIONS OF 4PS BENEFICIARIES IN URBAN BRGYS 900,000.00 900,000.00 BIGASAN NG BAYAN IN 7 BARANGAYS FOR 4PS BENEFICIARIES 715,269.00 715,269.00 COMPREHENSIVE AGRO-FORESTRY DEVELOPMENT PROJECT: LIVELIHOOD SUPPORT COMPONENT 2,000,000.00 2,000,000.00 COMMUNITY PRODUCTION & ECONOMIC FACILITY CENTER 500,000.00 500,000.00 DAY CARE CENTER AT BRGY. BASAG 700,000.00 700,000.00 CHILD-FOCUSED DISASTER RISK REDUCTION MGT. TRAINING FOR PARENTS 900,000.00 900,000.00 TRIBAL HOUSING/SHELTER AT PIANING 500,000.00 500,000.00 PRO-BIOTIC FEED PROCESSING (5 BRGYS.) 1,200,000.00 1,200,000.00 ORGANIC ENTERPRISES DISPLAY 7 STALLS IN CITY HALL COMPOUND (WOMEN & FARMERS) 600,000.00 600,000.00 MUSHROOM SHARED POST HARVEST & RESEARCH FACILITIES ( WITH BIO-MOLECULAR EQUIPMENT) 1,500,000.00 1,500,000.00 VARIOUS DTI IC PROJECTS 1,000,000.00 1,000,000.00 MEAT PROCESSING (HOME-BASED) - HOME-BASED LIVELIHOOD (SOAP MAKING, FABRIC CONDITIONER MAKING, FLOORWAX MAKING) FOR 6 BARANGAYS - HERBAL SUPPLEMENT MANUFACTURE/PRODUCTION - GARMENTS MANUFACTURE/FACTORY - E-TRIKE PROJECT - VARIOUS LRED PROJECTS 1,000,000.00 1,000,000.00 COMPREHENSIVE AGRO-FORESTRY DEVELOPMENT PROJECT: PRODUCT DEVELOPMENT & MARKETING COMPONENT - COMPREHENSIVE AGRO-FORESTRY DEVELOPMENT PROJECT: INVESTMENT PROMOTIONS COMPONENT - BONELESS BANGUS PROCESSING & PRODUCTION 600,000.00 600,000.00 BAKERY FACILITIES FOR WOMEN OF BASAG 500,000.00 500,000.00 BAKERY FACILITIES FOR PWDS 600,000.00 600,000.00 ROAD CONCRETING AT SAMPAGUITA ST., SAN VICENTE 900,000.00 900,000.00 COMMUNITY-BASED SKILLS TRAINING-PLUMBING, WELDING, CARPENTRY 1,340,171.00 1,340,171.00 1446 CARMEN 1,000,000.00 - 2,000,000.00 - 8,250,000.00 - - - - - 1,250,000.00 - - - 12,500,000.00 DEEP SEA FISHING (PAMO) 1,000,000.00 1,000,000.00 COMMERCIAL TREE PLANTATION -(FALCATA & OTHER FOREST PRODUCT) 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 8,250,000.00 8,250,000.00 CONCRETE DRAINAGE CANAL WITH BOX CULVERT (3 BARRELS) - CONSTRUCTION OF ONE SECTION GABION RIVER CONTROL - CONSTRUCTION OF ONE SECTION GABION RIVER CONTROL - CONSTRUCTION OF SEAWALL (BAY WALK) - CONSTRUCTION OF WATER SYSTEM (GRAVITY DRIVEN) - CONSTRUCTION OF PASALUBONG CENTER 1,250,000.00 1,250,000.00 1447 CITY OF CABADBARAN 1,000,000.00 2,100,000.00 - - 4,500,000.00 - - - 700,000.00 4,200,000.00 - - - - 12,500,000.00 REHABILITATION OF PANDANON IRRIGATION SYSTEM 2,100,000.00 2,100,000.00 COLD STORAGE / VAN 1,000,000.00 1,000,000.00 FLOOD CONTROL PROJECT 4,500,000.00 4,500,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 700,000.00 700,000.00 MICROENTERPRISE DEVELOPMENT TRACK FOR WOMEN, URBAN POOR AND DAP 1,700,000.00 1,700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: EMPLOYMENT FACILITATION TRACK (YOUTH) 500,000.00 500,000.00 CONSTRUCTION OF 3 DAY CARE CENTERS (PROTECTIVE SERVICES) 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS 1448 JABONGA - - - 1,150,000.00 6,000,000.00 - 1,100,000.00 - - 3,750,000.00 - - 500,000.00 - 12,500,000.00 REHABILITATION ON 1 UNIT CLASSROOM MARCOS TYPE BUILDING 1,150,000.00 1,150,000.00 VARIOUS DILG PROJECTS 6,000,000.00 6,000,000.00 CONSTRUCTION OF INTAKE TANK AND INSTALLATION OF TRANSMISSION LINE - CONSTRUCTION OF PUBLIC MARKET - REHABILITATION AND IMPROVEMENT OF BUNGA LEVEL III POTABLE WATER SYSTEM - IMPROVEMENT OF COLORADO LEVEL III POTABLE WATER SYSTEM - REHABILITATION AND IMPROVEMENT OF LIBAS POTABLE WATER SYSTEM - CONSTRUCTION OF MAGSAYSAY LEVEL II POTABLE WATER SYSTEM - CONSTRUCTION OF MARAIGING LEVEL II POTABLE WATER SYSTEM - REHABILITATION AND IMPROVEMENT OF POTABLE WATER SYSTEM - EXPANSION OF BIRTHING CLINIC 1,100,000.00 1,100,000.00 COMPLETION OF EVACUATION CENTER 1,100,000.00 1,100,000.00 CONSTRUCTION OF EVACUATION CENTER 1,500,000.00 1,500,000.00 CONSTRUCTION OF HALFWAY CENTER WITH COMPLETE AMENITIES FOR VAWC & CICL VICTIMS 1,150,000.00 1,150,000.00 LIVELIHOOD TRAINING PROGRAM ON CARPENTRY, ELECTRICAL, PLUMBING, MASONRY, PAINTING, STEEL WORKS, WELDING 500,000.00 500,000.00 1449 KITCHARAO - - - - 5,000,000.00 - - - - 7,500,000.00 - - - - 12,500,000.00 CLUSTER POTABLE WATER SUPPLY IMPROVEMENT PROJECT 5,000,000.00 5,000,000.00 CONSTRUCTION OF 2 SECTIONS GABION RIVER CONTROL CLUSTER PROJECT 7,500,000.00 7,500,000.00 1450 LAS NIEVES 3,700,000.00 - 500,000.00 - 8,300,000.00 - - - - - - - - - 12,500,000.00 RUBBER PLANTATION 1,000,000.00 1,000,000.00 2.1. CONST. OF SMALL WATER IMPOUNDING PROJECT (SWIP) 500,000.00 500,000.00 ACQUISITION OF FARM TRACTOR 600,000.00 600,000.00 ACQUISITION OF FARM TRACTOR 600,000.00 600,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 SWINE PRODUCTION 500,000.00 500,000.00 REFORESTATION 500,000.00 500,000.00 VARIOUS DILG PROJECTS 8,300,000.00 8,300,000.00 CONSTRUCTION OF RIVER PROTECTION - CONSTRUCTION OF WATER SYSTEM - CONSTRUCTION OF WATER SYSTEM - CONSTRUCTION OF WATER SYSTEM - IMPROVEMENT OF WATER SYSTEM - IMPROVEMENT OF WATER SYSTEM - IMPROVEMENT OF WATER SYSTEM - CONSTRUCTION OF WATER SYSTEM - IMPROVEMENT OF WATER SYSTEM - 1451 MAGALLANES 5,000,000.00 - - - 4,500,000.00 - - 1,000,000.00 - - 1,000,000.00 - - 1,000,000.00 12,500,000.00 FISH PROCESSING 1,700,000.00 1,700,000.00 POLYCULTURE PRODUCTION BY POND 1,700,000.00 1,700,000.00 POLYCULTURE PRODUCTION BY POND 1,000,000.00 1,000,000.00 FOOD PROCESSING (MEAT/FISH) 600,000.00 600,000.00 INSTALLATION OF WATER SUPPLY LEVEL - III 4,500,000.00 4,500,000.00 TULONG PANGHANAPBUHAY PARA SA MGA SELECTED DISPLACED WORKERS NG MAGALLANES 1,000,000.00 1,000,000.00 WHEELS TO SURVIVE PARA SA PANGARAP 500,000.00 500,000.00 CANDLE MAKING 500,000.00 500,000.00 ROAD CONCRETING - CABARDO ST. 1,000,000.00 1,000,000.00 1452 NASIPIT 2,500,000.00 - - - 7,000,000.00 - 500,000.00 - - 2,500,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 2,500,000.00 2,500,000.00 CACAO PRODUCTION - COLD STORAGE/ MINI ICE PLANT - DEVELOPMENT AND MANAGEMENT OF MARINE RESERVE AND FISH SANCTUARY - SPRING LEVEL 1 2,000,000.00 2,000,000.00 IMPROVEMENT OF EVACUATION CENTER 1,500,000.00 1,500,000.00 CONSTRUCTION OF DEEP WELL WATER SYSTEM 500,000.00 500,000.00 REHABILITATION OF LEVEL II WATER SYSTEM 3,000,000.00 3,000,000.00 EQUIPMENT FOR BIRTHING FACILITY 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTERS 2,500,000.00 2,500,000.00 1453 REMEDIOS T. ROMUALDEZ - - - - 4,500,000.00 - - - 3,000,000.00 5,000,000.00 - - - - 12,500,000.00 VARIOUS DILG PROJECTS 2,250,000.00 2,250,000.00 FLOOD CONTROL-RECHANNELLING OF BULALAWON CREEK - FLOOD CONTROL-RECHANNELLING OF HUMILOG CREEK - ACQUISITION OF EVACUATION FACILITIES - VARIOUS DILG PROJECTS 2,250,000.00 2,250,000.00 REHABILITATION OF WATER SYSTEM-POBLACION II - REHABILITATION OF WATER SYSTEM-BASILISA - REHABILITATION OF WATER SYSTEM-HUMILOG - TAGNOTE FALLS TOURISM DEV'T 3,000,000.00 3,000,000.00 CONSTRUCTION OF EVACUATION CENTER -POBLACION I 5,000,000.00 5,000,000.00 1454 SANTIAGO 500,000.00 - - - 1,500,000.00 - - - - - - - - 10,500,000.00 12,500,000.00 SUPPORT TO FISHERY PRODUCTION AND DEVELOPMENT (MOTORIZED FISHING BOATS, FISH NETS) 500,000.00 500,000.00 REHABILITATION/IMPROVEMENT OF POTABLE WATER SYSTEM 500,000.00 500,000.00 REHABILITATION/IMPROVEMENT OF POTABLE WATER SYSTEM 500,000.00 500,000.00 REHABILITATION/IMPROVEMENT OF POTABLE WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION/CONCRETING OF BABAG 4 ROAD 10,500,000.00 10,500,000.00 1455 TUBAY 1,343,350.00 - 1,750,000.00 - 1,628,300.00 - 1,170,000.00 - - 650,000.00 5,458,350.00 - 500,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 1,343,350.00 1,343,350.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUSTAINABLE AGRI-BASED LIVELIHOOD : SWINE PRODUCTION - SUSTAINABLE AGRI-BASED LIVELIHOOD : HOG FATTENING - ORGANIC VEGETABLE PRODUCTION - NATIONAL GREENING PROGRAM: PROJECT DEVELOPMENT OF THE POB. 2 MANGROVE AREA PHASE 2 1,250,000.00 1,250,000.00 NATIONAL GREENING PROGRAM: TREE PLANTATION IN BRGY DONA TELESFORA 500,000.00 500,000.00 CONTRUCTION OF WATER SYSTEM LEVEL 3 1,628,300.00 1,628,300.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 670,000.00 670,000.00 UPGRADING OF BRGY HEALTH STATION 500,000.00 500,000.00 PROTECTIVE SERVICE INFRA PROJECTS: CONSTRUCTION OF DAY CARE CENTER 650,000.00 650,000.00 YAMAN PINOY: TADAP SPA AND BEAUTY PARLOR FOR PWD 583,350.00 583,350.00 YAMAN PINOY AND SSF: SARDINE PROCESSING 1,250,000.00 1,250,000.00 YAMAN PINOY AND SSF: PROCUREMENT OF SEWING MACHINE FOR RTWPRODUCTION 1,250,000.00 1,250,000.00 YAMAN PINOY AND SSF: DEVELOPMENT OF NUTRI-CURLS PROJECT 1,500,000.00 1,500,000.00 YAMAN PINOY AND SSF: COCO PROCESSING 875,000.00 875,000.00 TECHNICAL VOCATION TRAINING/ COMMUNITY BASED TRAINING 500,000.00 500,000.00 AGUSAN DEL SUR 80,077,733.00 2,976,440.00 6,777,250.00 2,150,000.00 70,747,455.00 - 8,350,000.00 - 700,000.00 12,369,250.00 24,152,622.00 1,000,000.00 990,000.00 15,209,250.00 225,500,000.00 1456 BUNAWAN 2,250,000.00 - 1,500,000.00 - - - - - - 1,200,000.00 - - - 7,550,000.00 12,500,000.00 IMPROVEMENT OF EGE FEED MILL CUM SWINE PRODUCTION 500,000.00 500,000.00 RICE PRODUCTION SUPPORT PROGRAM 1,750,000.00 1,750,000.00 ESTABLISHMENT OF BAMBOO PLANTATION FOR ENGINEERED BAMBOO INDUSTRY 1,500,000.00 1,500,000.00 CONSTRUCTION DAY CARE CENTERS 1,200,000.00 1,200,000.00 CONCRETING OF POBLACION-MAMBALILI ROAD (PHASE 3) 7,550,000.00 7,550,000.00 1457 CITY OF BAYUGAN 16,500,000.00 - 1,000,000.00 - 1,500,000.00 - 2,000,000.00 - - 1,000,000.00 8,000,000.00 - - - 30,000,000.00 VARIOUS DA PROJECTS 16,500,000.00 16,500,000.00 PURCHASE OF TWO UNITS RICE HARVESTER AND TWO UNITS RICE PLANTER - ESTABLISHMENT OF FLAT BED DRYER - PURCHASE OF TRACTOR - ORGANIC VEGETABLES PRODUCTION - TRADING POST FOR VEGETABLES - COLD STORAGE FACILITY VAN - NATIVE LIVESTOCK RAISING - NATIVE FOWL RAISING - PRE AND POST HARVEST FACILITIES - LIVESTOCK PRODUCTION - RICE MILL ESTABLISHMENT (SINGLE PASS) - HIGH VALUE VEGETABLE CROPS TRADING POST - ESTABLISHMENT OF COMMUNITY NURSERY FOR DEPTEROCARP TREES 1,000,000.00 1,000,000.00 SALINTUBIG 1,500,000.00 1,500,000.00 MNCHN AND INFECTIOUS DISEASE CONTROL, HEALTH EMERGENCY MANAGEMENT AND HIV/AIDS 2,000,000.00 2,000,000.00 ASENSO NA WALANG IWANAN SA MGA KABABAEHAN 1,000,000.00 1,000,000.00 YAMANG PINOY: SSF ON CASAVA PROCESSING 500,000.00 500,000.00 SUPPLY DISTRIBUTION FOR ELECTRICAL SUPPLY CHAIN 500,000.00 500,000.00 SHARED SERVICE FACILITY 2,500,000.00 2,500,000.00 PASALUBONG CENTER 500,000.00 500,000.00 OTOP PINOY EXPRESS 500,000.00 500,000.00 FERMENTED CACAO PROCESSING CENTER & RAWMATERIAL SUPPORT 3,000,000.00 3,000,000.00 BALUT PRODUCTION 500,000.00 500,000.00 1458 ESPERANZA 8,885,000.00 - 1,530,000.00 - 3,910,000.00 - 700,000.00 - - - 5,475,000.00 - - - 20,500,000.00 ENHANCING FOOD SECURITY AND SUFFICIENCY THRU ORGANIC FARMING AND MARKETING 8,885,000.00 8,885,000.00 RIVERBANK REHABILITATION PROJECT (BAMBOO PLANTATION) 1,530,000.00 1,530,000.00 CONSTRUCTION OF LEVEL III POTABLE WATER SUPPLY SYSTEM (PWSS) 910,000.00 910,000.00 CONSTRUCTION OF POTABLE WATERWOKS SYSTEM 3,000,000.00 3,000,000.00 PROCUREMENT OF MEDICAL SUPPLIES AND EQUIPMENT 700,000.00 700,000.00 E-KAWAYAN PROCESSING PLANT (EKPP) ESTABLISHMENT 5,475,000.00 5,475,000.00 1459 LA PAZ 8,357,673.00 - - - 3,584,705.00 - - - - - 557,622.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 8,357,673.00 8,357,673.00 ACQUISITION OF 10 UNITS RICE AND CORN MILL - ACQUISITION OF 2 UNITS FARM TRACTOR WITH COMPLETE ACCESSORIES - ACQUISITION OF 7 MECHANICAL DRYERS - CONSTRUCTION OF EVACUATION CENTER WITH TOILETS 2,389,803.00 2,389,803.00 ACQUISITION OF 5 UNITS RESCUE OUTBOARD AND 1 RUBBER BOAT 1,194,902.00 1,194,902.00 RURAL MICRO-ENTERPRISE DEVELOPMENT PROGRAM 557,622.00 557,622.00 1460 LORETO 2,000,000.00 - - - 6,500,000.00 - 500,000.00 - - - - 1,000,000.00 - 3,500,000.00 13,500,000.00 WAREHOUSE AND SOLAR DRYER 2,000,000.00 2,000,000.00 RESCUE EQUIPMENT 2,000,000.00 2,000,000.00 POTABLE WATER SYSTEM 3,500,000.00 3,500,000.00 CAPABILITY BUILDING FOR CSO 1,000,000.00 1,000,000.00 RURAL HEALTH MIDWIVES PLACEMENT PROGRAM 500,000.00 500,000.00 CORE LOCAL ROAD CONSTRUCTION/ REHABILITATION/ MAINTENANCE 3,500,000.00 3,500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,000,000.00 1,000,000.00 1461 PROSPERIDAD (CAPITAL) 13,532,500.00 - - - 6,017,500.00 - - - 700,000.00 1,500,000.00 4,750,000.00 - - - 26,500,000.00 VARIOUS DA PROJECTS 13,532,500.00 13,532,500.00 IMPROVEMENT OF FARM LEVEL GRAINS CENTER (FLGC) - PRODUCTION INPUTS ASSISTANCE IN SUPPORT TO FLGC OPERATION - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS SUPPORT TO FEEDMILL OPERATION - RICE + DUCK PRODUCTION - EXPANSION OF TRADING POST - PRODUCTION SUPPORT TO TRADING POST - ABACA PRODUCTION - WATER SYSTEM 6,017,500.00 6,017,500.00 ESTABLISHMENT OF ECOTOURISM RECREATION CENTER 700,000.00 700,000.00 CONSTRUCTION OF DAY CARE CENTER 1,500,000.00 1,500,000.00 SHARED SERVICE FACILITY IN SUPPORT TO ECOTOURISM RECREATION CENTER 750,000.00 750,000.00 IMPROVEMENT OF KAONG PROCESSING & OTHER SHARED SERVICE FACILITIES 4,000,000.00 4,000,000.00 1462 ROSARIO 3,020,500.00 - 1,122,250.00 - 7,657,250.00 - - - - - 700,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 3,020,500.00 3,020,500.00 GOAT RAISING WITH VERMI PRODUCTION - ORGANIC GULAYAN NG BAYAN WITH VERMI CULTURE - CARABAO PRODUCTION - NFTS SWINE PRODUCTION WITH TILAPIA CULTURE - ORGANIC TRADING POST - ESTABLISHMENT OF ORGANIC PINAWA RICE MILL - ESTABLISHMENT OF MECHANICAL GRAIN DRYER - FRESHWATER FISH PRODUCTION & PROCESSING PROJECT - COMMUNITY BASE WATERSHED ESTABLISHMENT & LIVELIHOOD PROJECT 1,122,250.00 1,122,250.00 FLOOD CONTROL REHABILITATION OF DAMAGE DIKE ALONG SOLIBAO RIVER 7,657,250.00 7,657,250.00 YAMAN PINOY COMMUNITY LIVELIHOOD PROGRAM 700,000.00 700,000.00 1463 SAN FRANCISCO - - - 1,000,000.00 9,600,000.00 - 1,500,000.00 - - 5,400,000.00 - - - - 17,500,000.00 REPAIR/ RENOVATION OF CLASSROOM 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 9,100,000.00 9,100,000.00 COMPLETION OF EVECUATION CENTER FACILITY - CONCRETING OF FMR - FLOOD CONTROL - CAPACITY BUILDING FOR CSO 500,000.00 500,000.00 REPAIR/ RENOVATION OF EREGION XISTING HEALTH CENTER 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTER AT BRGY. 4 900,000.00 900,000.00 CONSTRUCTION OF CRISIS CENTER 4,000,000.00 4,000,000.00 1464 SAN LUIS 4,100,000.00 2,000,000.00 - 300,000.00 5,000,000.00 - 600,000.00 - - 500,000.00 - - - - 12,500,000.00 RICE AND CORN MILL 1,000,000.00 1,000,000.00 ACQUISITION OF RICE THRESHERS, MUDBOAT AND FARM TRACTOR 3,100,000.00 3,100,000.00 IRRIGATION 2,000,000.00 2,000,000.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 POTABLE WATER SYSTEM 5,000,000.00 5,000,000.00 LABORATORY MACHINE (RECTAL BIOPSY MACHINE) 600,000.00 600,000.00 INDOOR & OUTDOOR FACILITIES FOR DAY CARE CENTERS 500,000.00 500,000.00 1465 SANTA JOSEFA 3,797,000.00 - - - 6,553,000.00 - 500,000.00 - - - 1,650,000.00 - - - 12,500,000.00 OPV CORN PRODUCTION- ADDITIONAL OF 25 HAS. 900,000.00 900,000.00 ORGANIC RICE PROCESSING:PROVISION OF POST HARVEST FACILITIES 1,397,000.00 1,397,000.00 VEGETABLE PRODUCTION AND MARKETING (WITH FACILITIES AND EQUIPMENT)- ADDITIONAL OF 5 HAS. 500,000.00 500,000.00 LIVESTOCK PRODUCTION AND MARKETING (NATIVE AND CROSS/HIGH BREED): ORGANIC FEEDS PROCESSING 500,000.00 500,000.00 BANGUS & TILAPIA PRODUCTION AND MARKETING: [2 CAGES TILAPIA AND 1 FOR BANGUS] 500,000.00 500,000.00 1] REHABILITATION/ENHANCEMENT OF LEVEL II/III POTABLE WATER SUPPLY (PWS)SYSTEM: ANGAS, AURORA (DEEP WELL), TAPAZ (DEEP WELL) , SAN JOSE (REHAB.), AWAO, POBLACION, PATROCINIO, PAG-ASA, SAYON, CONCEPCION, AND STA. ISABEL 6,553,000.00 6,553,000.00 8] PROVISION OF COMPLETE TREATMENT PACK TO PATIENTS MEMBERS OF CCT/NHTS 500,000.00 500,000.00 REPAIR OF SWORD'S CANTEEN & CATERING SERVICES CENTER 500,000.00 500,000.00 ESTABLISHMENT OF WOMEN AND YOUTH LIVELIHOOD CENTER (WITH WORKING CAPITAL) 650,000.00 650,000.00 ESTABLISHMENT OF FOOD AND MEAT PROCESSING ENTERPRISE WITH BUILDING FACILITIES AND EQUIPMENT 500,000.00 500,000.00 1466 SIBAGAT 900,000.00 - - - 9,800,000.00 - - - - - 1,800,000.00 - - - 12,500,000.00 ABACA PRODUCTION 900,000.00 900,000.00 VARIOUS DILG PROJECTS 4,350,000.00 4,350,000.00 CONSTRUCTION OF HANGING FOOT BRIDGE - REHABILITATION OF MUNICIPAL TERMINAL - CONSTRUCTION OF WATER SYSTEM LEVEL II 500,000.00 500,000.00 CONSTRUCTION OF WATER SYSTEM 1,800,000.00 1,800,000.00 CONSTRUCTION OF WATER SYSTEM 2,650,000.00 2,650,000.00 CSO CAPABILITY BUILDING 500,000.00 500,000.00 SKILLS TRAINING (HANDICRAFTS AND LIFELINE SKILLS) 500,000.00 500,000.00 CONSTRUCTION OF MUNICIPAL OTOP STORE 1,300,000.00 1,300,000.00 1467 TALACOGON 6,085,060.00 976,440.00 - - - - - - - 569,250.00 720,000.00 - 990,000.00 4,159,250.00 13,500,000.00 CORN PRODUCTION 990,000.00 990,000.00 PROVISION AND ACQUISITION OF FARM MACHINERIES AND EQUIPMENTS 3,194,980.00 3,194,980.00 CONSTRUCTION OF MULTI-PURPOSE DRYING PAVEMENTS (POST HARVEST FACILITIES) 1,182,600.00 1,182,600.00 ESTABLISHMENT OF DEMONSTRATION FARM PRODUCTION OF TRADITIONAL RICE SEED VARIETIES 717,480.00 717,480.00 PROVISION OF IRRIGATION FACILITIES IN RICEFIELDS WITH NO IRRIGATION FACILITY 976,440.00 976,440.00 MICRO BUSINESS ENTERPRISE DEVELOPMENT (SKA FEDERATION CATERING SERVICES) 569,250.00 569,250.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ESTABLISHMENT OF MEAT SHOP AND MEAT PROCESSING 720,000.00 720,000.00 LIVELIHOOD ASSISTANCE TO FAMILIES W/ MALNOURISHED CHILDREN (ORGANIC VEGETABLE PRODUCTION & MARKETING) 569,250.00 569,250.00 TO BE IDENTIFIED 3,590,000.00 3,590,000.00 SKILLS TRAINING OF SKILLED AND NON-SKILLED MANPOWER AND PROVISION OF EQUIPMENT/FACILITIES 990,000.00 990,000.00 1468 TRENTO 3,800,000.00 - 1,625,000.00 850,000.00 5,175,000.00 - 850,000.00 - - 2,200,000.00 - - - - 14,500,000.00 VARIOUS DA PROJECTS 3,800,000.00 3,800,000.00 SUPPORT TO ORGANIC PRODUCTS TRADING POST/DISPLAY CENTER - RICE PROCESSING CENTER-TRADING POST - SUPPORT TO HIGH VALUE COMMERCIAL CROPS (OIL, PALM, RUBBER, BANANA, FRUIT TREES) - NATIONAL GREENING PROGRAM (BUDDED RUBBER PLANTATION) 1,625,000.00 1,625,000.00 REPAIR OF SCHOOL BUILDINGS (ELEM.) 850,000.00 850,000.00 REHAB/EXTENSION OF TRENTO WATER SUPPLY PROJECT (LEVEL III)- PHASE III 4,675,000.00 4,675,000.00 CAPABILITY BUILDING FOR CSO 500,000.00 500,000.00 REHAB/REPAIR OF OLD RHU BUILDING 850,000.00 850,000.00 REHABILITATION OF DAY CARE CENTERS 850,000.00 850,000.00 ESTABLISHMENT OF SENIOR CITIZEN'S HEALTH CARE & WELLNESS CENTER 500,000.00 500,000.00 WOMEN, CHILD AND YOUTH FRIENDLY HOME 850,000.00 850,000.00 1469 VERUELA 6,850,000.00 - - - 5,450,000.00 - 1,700,000.00 - - - 500,000.00 - - - 14,500,000.00 VARIOUS DA PROJECTS 6,850,000.00 6,850,000.00 LUMBIA PLANTATION - BRGY. POBLACION TRADING POST - RUBBER DEVELOPMENT - TRADING POST WITH REFRIGERATED VAN AND COLD STORAGE - MDRRMC RESCUE BOAT 800,000.00 800,000.00 BRGY. LA FORTUNA RESCUE EQUIPMENT 500,000.00 500,000.00 BRGY. SAN GABRIEL RAIN WATER HARVESTER 2,350,000.00 2,350,000.00 BRGY. KATIPUNAN WATER SYSTEM LEVEL II 800,000.00 800,000.00 BRGY. BINONGAN EXPANSION OF WATER SYSTEM LEVEL 500,000.00 500,000.00 BRGY. SISIMON RAIN WATER HARVESTER 500,000.00 500,000.00 BRGY. BACAY II HEATLH CENTER 500,000.00 500,000.00 BRGY. DON MATEO HEALTH CENTER 600,000.00 600,000.00 MAGSAYSAY HEALTH CENTER 600,000.00 600,000.00 PROCESSING OF WOOD NOVELTY ITEMS 500,000.00 500,000.00 DINAGAT ISLANDS 28,104,000.00 - 3,000,000.00 4,554,000.00 22,520,000.00 - 2,015,000.00 1,500,000.00 1,000,000.00 10,883,400.00 4,923,600.00 - 1,500,000.00 7,500,000.00 87,500,000.00 1470 BASILISA (RIZAL) 500,000.00 - - - 2,000,000.00 - - 500,000.00 - 2,000,000.00 - - - 7,500,000.00 12,500,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE (ACQUISITION OF 2 UNITS MUDBOAT, 2 UNIS THRESHER AND 1 SLEDGE) 500,000.00 500,000.00 CONTRUCTION OF EVACUATION CENTER 2,000,000.00 2,000,000.00 DILP - TUPAD (PROVISION OF PANGKABUHAYAN STARTER KITS WITH TRAINING) 500,000.00 500,000.00 CONSTRUCTION OF 1 UNIT DAYCARE CENTER 750,000.00 750,000.00 REPAIR OF 3 UNITS DAY CARE CENTER 750,000.00 750,000.00 PROVISION OF ECCD LEARNING MATERIALS AND SNP FOR 27 DAY CARE CENTERS 500,000.00 500,000.00 CONCRETING OF DIEGAS - RITAGLENDA CORE LOCAL ROAD PHASE 1 5,500,000.00 5,500,000.00 CONCRETING OF FERDINAND - STO. NINO CORE LOCAL ROAD PHASE 2 2,000,000.00 2,000,000.00 1471 CAGDIANAO 3,500,000.00 - - - 5,000,000.00 - - 500,000.00 - 3,000,000.00 - - 500,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 3,500,000.00 3,500,000.00 LIVELIHOOD (ORGANIC FERTILIZER PRODUCTION) - IMPROVEMENT OF FISH PORT - ACQUISITION OF MOTORIZED FISHING BOAT (50 UNITS) - LIVELIHOOD (MEAT PROCESSING) - LIVELIHOOD ENHANCE PROGRAM - CORN PRODUCTION - LIVELIHOOD - CONSTRUCTION OF SEAWALL 2,500,000.00 2,500,000.00 IMPROVEMENT OF LEVEL 2 WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF WATER SYSTEM II 2,000,000.00 2,000,000.00 LIVELIHOOD (CATERING) 500,000.00 500,000.00 CONSTRUCTION OF 100 M SEAWALL 3,000,000.00 3,000,000.00 CAPABILITY BUILDING (CARPENTRY, MASONRY, BUTCHERING) 500,000.00 500,000.00 1472 DINAGAT 1,880,000.00 - - 500,000.00 8,020,000.00 - - - - 1,600,000.00 500,000.00 - - - 12,500,000.00 ACQUISITION OF FISHING GEAR 1,370,000.00 1,370,000.00 MEAT PROCESSING (LONGGANIZA, HOTDOG, LUNCHEON MEAT, CHORIZO) 510,000.00 510,000.00 REPAIR/ REHABILITATION OF INDUSTRIAL ARTS CLASSROOM OF DINAGAT SCHOOL OF FISHERIES 500,000.00 500,000.00 VARIOUS DILG PROJECTS 8,020,000.00 8,020,000.00 CONCRETING OF MOLETA BLVD. - EVACUATION FACILITIES - ACQUISITION/ PURCHASE OF OF RESCUE MOTORIZED BANCA/ BOAT - ACQUISITION OF SEA AMBULANCE WITH COMPLETE EMERGENCY KIT - DAY CARE CENTER CAYETANO 800,000.00 800,000.00 DAY CARE CENTER SITIO ZAMORA GOMEZ 800,000.00 800,000.00 OTOP STORE 500,000.00 500,000.00 1473 LIBJO (ALBOR) 8,500,000.00 - - - 3,000,000.00 - - - - - - - 1,000,000.00 - 12,500,000.00 VARIOUS DA PROJECTS 8,500,000.00 8,500,000.00 CROP PRODUCTION: CEREAL. CORN, ROOT CROP - LIVELIHOOD ENGAGEMENT, POULTRY PRODUCTION, AND MEAT PROCESSING - HOG RAISING PRODUCTION - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS RICE PRODUCTION - FISH CORAL - BANANA PRODUCTION - REHABILITATION OF WATER SYSTEM LEVEL II 3,000,000.00 3,000,000.00 SCHOLARSHIP PROGRAM SPONSORED BY TESDA 1,000,000.00 1,000,000.00 1474 LORETO 9,400,000.00 - - 1,300,000.00 - - - - 1,000,000.00 800,000.00 - - - - 12,500,000.00 VARIOUS PROJECTS DA PROJECTS 7,800,000.00 7,800,000.00 BANGUS PRODUCTION - FISH NETS (FOR BALO AND BOLIS) - ESTABLISHMENT OF COMMUNAL PIGGERY WITH MEAT PROCESSING - REHABILITATION AND ESTBALISHMENT OF THE COLD STORAGE FACILITY AND ICE PLANT - ESTABLISHMENT OF MARINE RESERVE AND FISH SANCTUARIES - MAINTENANCE AND ENHANCEMENT OF SAN JUAN MARINE FISH SANCTUARY - TABUNAN IRRIGATION PROJECT 1,600,000.00 1,600,000.00 GULAYAN SA PAARALAN 500,000.00 500,000.00 REPAIR AND REHABILITATION OF CLASSROOMS AND SCHOOL BUILDINGS 800,000.00 800,000.00 LOCAL TOURISM DEVELOPMENT PROJECT 1,000,000.00 1,000,000.00 REPAIR AND UPGRADING OF DAY CARE CENTERS 800,000.00 800,000.00 1475 SAN JOSE (CAPITAL) 2,608,000.00 - - 2,000,000.00 1,000,000.00 - 1,515,000.00 500,000.00 - 453,400.00 4,423,600.00 - - - 12,500,000.00 INTEGRATED AGRICULTURE AND FISHERY DEVELOPMENT PROJECT 2,608,000.00 2,608,000.00 BASIC EDUCATION FACILITIES: REPAIR AND REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 STRENTHENING PROJECT FOR THE POOR BUT POTENTIAL CSOS OF SAN JOSE (CAPACITY BUILDING FOR CSO) 500,000.00 500,000.00 CAPACITY BUILDING FOR CIVIL SOCIETY ORGANIZATIONS DEVELOPMENT PROJECT (CAP-BCSOD PROJECT) 500,000.00 500,000.00 MNCHN: TRAINING OF HEALTH PROVIDERS ON BASIC EMERGENCY OBSTETRIC AND NEWBORN CARE (BEMONC) AND TRAINING OF BHWFOR IMPROVED PREGNANCY TRACKING 500,000.00 500,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 504,000.00 504,000.00 TB CONTROL 511,000.00 511,000.00 DOLE DLIP: NEGOKART 500,000.00 500,000.00 VARIOUS DSWD PROJECTS 453,400.00 453,400.00 CONSTRUCTION OF DAY CARE CENTER - RENOVATION OF DAY CARE CENTER - RUMEPP: TOURISM SUPPORT PROJECT FO THE POOR WAMPCO WOMEN 1,000,000.00 1,000,000.00 RUMEPP: RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 1,523,600.00 1,523,600.00 RUMEPP: INTEGRATED FOOD PROCESSING AND PRODUCTION 1,200,000.00 1,200,000.00 RUMEPP: BUSINESS DEVELOPMENT SERVICES AND TECHNICAL SKILLS TRAINING FOR FARMERS ASSN. 700,000.00 700,000.00 1476 TUBAJON 1,716,000.00 - 3,000,000.00 754,000.00 3,500,000.00 - 500,000.00 - - 3,030,000.00 - - - - 12,500,000.00 MARINE RESERVE AND FISH SANCTUARIES 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION 1,216,000.00 1,216,000.00 NATIONAL GREENING PROGRAM 3,000,000.00 3,000,000.00 GULAYALAN SA PAARALAN 754,000.00 754,000.00 VARIOUS DILG PROJECTS 3,500,000.00 3,500,000.00 RESCUE EQUIPMENT - FLOOD CONTROL - HEALTH FACILITIES AND ENHANCEMENT PROGRAM 500,000.00 500,000.00 CONTRUCTION OF EVACUATION CENTER 3,030,000.00 3,030,000.00 SURIGAO DEL NORTE 55,593,600.00 5,000,000.00 - 4,949,600.00 146,893,840.00 700,000.00 11,938,000.00 - 5,800,000.00 17,952,560.00 5,200,000.00 - 3,810,000.00 19,531,400.00 277,369,000.00 1477 ALEGRIA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 MUN. EVACUATION CENTER 12,500,000.00 12,500,000.00 1478 BACUAG 2,438,000.00 500,000.00 - 162,000.00 8,090,000.00 - - - - 500,000.00 - - 810,000.00 - 12,500,000.00 CONCRETING OF IRRIGATION CANAL 500,000.00 500,000.00 AGRICULTURAL DEVELOPMENT PROJECTS 2,438,000.00 2,438,000.00 GULAYAN SA PAARALAN 162,000.00 162,000.00 VARIOUS DILG PROJECTS 7,460,000.00 7,460,000.00 CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF CAMBUAYON - PAUTAO FOOT BRIDGE - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF FLOOD CONTROL STRUCTURES - CONSTRUCTION OF WATER SYSTEM - STO ROSARIO 630,000.00 630,000.00 SUSTAINABLE LIVELIOOOD PROGRAM-MICRO ENTERPRISE DEVELOPMENT TRACK 500,000.00 500,000.00 SKILLS TRAINING AND ASSESSMENT 810,000.00 810,000.00 1479 BURGOS 1,680,000.00 - - - 6,500,000.00 - - - - 4,320,000.00 - - - - 12,500,000.00 TRADING POST 1,680,000.00 1,680,000.00 VARIOUS DILG PROJECTS 6,500,000.00 6,500,000.00 FLOOD CONTROL - P CALAMANSI - FLOOD CONTROL - P MANGA - EVACUATION CENTER - BARANGAY HEALTH STATION - MATIN-AO 2,160,000.00 2,160,000.00 BARANGAY HEALTH STATION - SAN MATEO 2,160,000.00 2,160,000.00 1480 CLAVER 8,869,000.00 - - - - - - - - - 1,000,000.00 - - - 9,869,000.00 ENHANCING LAND PRODUCTIVITY IN SURIGAO DEL NORTE THROUGH PLANTMATE ORGANIC FERTILIZER PRODUCTION 8,869,000.00 8,869,000.00 CLAVER THEMEN PARK, RECREATIONM & EDUCATIONAL DEPOT - ESTABLISHMENT OF PASALUBONMG CENTER 1,000,000.00 1,000,000.00 1481 DAPA 3,000,000.00 - - - 3,500,000.00 - 2,500,000.00 - - 1,000,000.00 2,000,000.00 - 500,000.00 - 12,500,000.00 VARIOUS PROJECTS DA PROJECTS 3,000,000.00 3,000,000.00 FOOD SUFFICIENCY: SUSTAINABLE AGRI-FISHERY LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS - FOOD SUFFICIENCY: INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS EVACUATION CENTER - CONSOLACION 3,000,000.00 3,000,000.00 PURCHASE OF RESCUE EQUIPMENT 500,000.00 500,000.00 HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 REHABILITATION / CONSTRUCTION OF BRGY HEALTH STATION - CAMBAS & OSMENA 2,000,000.00 2,000,000.00 CONSTRUCTION OF DAY CARE CENTER 1,000,000.00 1,000,000.00 RURAL MICRO ENTERPRISE DEVELOPMENT PROGRAM 2,000,000.00 2,000,000.00 COMMUNITY - BASEKD SKILLS TRAININGS 500,000.00 500,000.00 1482 DEL CARMEN - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 MUNICIPAL EVACUATION CENTER 12,500,000.00 12,500,000.00 1483 GENERAL LUNA 8,900,000.00 - - - - 700,000.00 1,500,000.00 - - 1,400,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,900,000.00 3,900,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD - AGRI-FISHERY TRAINING - INFRASTRUCTURE SUPPORT TO AGRI AND FISHERY PRODUCTION - FISHING BOATS - INFRASTRUCTURE SUPPORT TO AGRI AND FISHERY PRODUCTION - FISH SHELTER - IRRIGATION PROJECTS 5,000,000.00 5,000,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM (HEP) 700,000.00 700,000.00 HEALTH FACILITIES ENHANCEMENT 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICR0 ENTERPRISE DEVELOPMENT TRACK 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: MICR0 ENTERPRISE DEVELOPMENT TRACK - MOTORCYCLE SPARE PARTS 700,000.00 700,000.00 1484 GIGAQUIT 500,000.00 - - - 11,500,000.00 - - - - - 500,000.00 - - - 12,500,000.00 ACQUISITION OF PRE & POST HARVEST FACILITIES 500,000.00 500,000.00 VARIOUS DILG PROJECTS 8,700,000.00 8,700,000.00 CONSTRUCTION OF SEA WALL - INSTALLATION OF JETMATIC HAND PUMP - CONSTRUCTIN OF FLOOD CONTROL - MAHANUB - CONSTRUCTIN OF FLOOD CONTROL - LAHI - CONSTRUCTION OF EVACUATION CENTER - VILLAFLOR - CONSTRUCTION OF BRGY. SITE DRAINAGE SYSTEM W/ BOX CULVERT OPTIONS - CONSTRUCTION OF FARM BRIDGE - IPIL - CONSTRUCTION OF FARM BRIDGE - SAN ISIDRO - IMPROVEMENT OF WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM 1,800,000.00 1,800,000.00 LIVELIHOOD PROGRAM - WINE PRODUCTION 500,000.00 500,000.00 1485 MAINIT 1,900,000.00 - - 550,000.00 700,000.00 - - - - 1,150,000.00 - - - 8,200,000.00 12,500,000.00 JETTY/ WHARF 1,900,000.00 1,900,000.00 BASIC EDUCATION FACILITIES 550,000.00 550,000.00 IMPROVEMENT OF WATER SYSTEM 700,000.00 700,000.00 PROTECTIVE SERVICE (INFRA PROJECT) 1,150,000.00 1,150,000.00 CONCRETING OF ROAD 3,500,000.00 3,500,000.00 ROAD CONCRETING WITH DRAINAGE 1,300,000.00 1,300,000.00 LOCAL ROAD CONCRETING - TAPIAN 1,300,000.00 1,300,000.00 LOCAL ROAD CONCRETING - BINGA 800,000.00 800,000.00 LOCAL ROAD CONCRETING - CANTUGAS 1,300,000.00 1,300,000.00 1486 MALIMONO 3,106,600.00 - - 887,600.00 2,203,840.00 - 4,438,000.00 - - 532,560.00 - - - 1,331,400.00 12,500,000.00 REHABILITATION OF IRRIGATION DAM 443,800.00 443,800.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHERY PRODUCTION (MOTORIZED FISHING BOAT AND FISHING EQUIPMENT) 443,800.00 443,800.00 EXPANDED AGRI-BUSINESS ACTIVITIES 1 (SWINE RAISING FEEDS PRODUCTION) 443,800.00 443,800.00 EXPANDED AGRI-BUSINESS ACTIVITIES 2 (BANANA BY-PRODUCT PRODUCTION) 443,800.00 443,800.00 EXPANDED AGRI-BUSINESS ACTIVITIES 3 (TAMBO PLANTATION AND TAMBO BROOM PRODUCTION) 443,800.00 443,800.00 SUSTAINABLE AGRI-FISHERY LIVELIHOOD (SQUID-DRYING FACILITY) 443,800.00 443,800.00 REHAB AND MAINTENANCE OF MARINE AND PROTECTED AREAS 443,800.00 443,800.00 BASIC EDUCATION FACILITIES (REPAIR OF CLASSROOM) 887,600.00 887,600.00 VARIOUS DILG PROJECTS 1,760,040.00 1,760,040.00 CONSTRUCTION OF EVACUATION CENTER - SAN ISIDRO - PROVISION OF RESCUE EQUIPMENT - CONSTRUCTION OF FLOOD CONTROL - TINAGO - REHAB OF WATERWORKS SYSTEM OF IP COMMUNITY 443,800.00 443,800.00 CONSTRUCTION OF BHS 4,438,000.00 4,438,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 532,560.00 532,560.00 CORE LOCAL ROAD CONSTRUCTION (CONSTRUCTION OF PUNTA RIVER STEEL FOOTBRIDGE) 1,331,400.00 1,331,400.00 1487 PILAR - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 CONSTRUCTION OF MUNICIPAL EVACUATION CENTER 2,500,000.00 2,500,000.00 REHABILITATION AND UPGRADING OF POTABLE WATER SYSTEM LEVEL III 10,000,000.00 10,000,000.00 1488 PLACER 8,600,000.00 - - - 2,000,000.00 - - - - 1,200,000.00 700,000.00 - - - 12,500,000.00 CONSTRUCTION OF FOOD TERMINAL 3,000,000.00 3,000,000.00 CONSTRUCTION/EXPANSION OF PLACER GOLDEN ICEPLANT 4,500,000.00 4,500,000.00 LIVELIHOOD PROGRAM FOR FARMERS - MUNICIPAL WIDE 1,100,000.00 1,100,000.00 CAPACITY DEVELOPMENT FOR CSOS 2,000,000.00 2,000,000.00 CONSTRUCTION OF DAY CARE CENTERS AT BRGYS. PANANAY-AN & MACALAYA 1,200,000.00 1,200,000.00 MICRO ENTERPRISE DEVELOPMENT - SMED PLAN 700,000.00 700,000.00 1489 SAN BENITO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 LEVEL III WATER SYSTEM PROJECT FOR BRGYS. TALISAY & STA CRUZ 12,500,000.00 12,500,000.00 1490 SAN FRANCISCO - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DILG PROJECTS 12,500,000.00 12,500,000.00 EVACUATION FACILITY - POBLACION & BALITE - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS COMPLETION OF MAFC BUILDING - PURCHASE OF RESCUE EQUIPMENT - 1491 SAN ISIDRO 4,800,000.00 - - - 7,700,000.00 - - - - - - - - - 12,500,000.00 ACQUISITION OF FARM TRACTOR 2,400,000.00 2,400,000.00 ACQUISITION OF FARM TRACTOR 2,400,000.00 2,400,000.00 VARIOUS DILG PROJECTS 2,700,000.00 2,700,000.00 CONSTRUCTION OF DRAINAGE AND CANAL - FLOOD CONTROL - IMPROVEMENT OF CAPACITY - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF DRAINAGE AND CANAL - REHABILITATION OF WATER SYSTEM LEVEL II 1,000,000.00 1,000,000.00 IMPROVEMENT OF WATER SYSTEM LEVEL II 1,000,000.00 1,000,000.00 IMPROVEMENT OF WATER SYSTEM LEVEL II 1,000,000.00 1,000,000.00 IMPROVEMENT OF WATER SYSTEM LEVEL II 1,000,000.00 1,000,000.00 IMPROVEMENT OF WATER SYSTEM LEVEL II 1,000,000.00 1,000,000.00 1492 SANTA MONICA - - - - 12,500,000.00 - - - - - - - - - 12,500,000.00 VARIOUS DILG PROJECTS 10,500,000.00 10,500,000.00 CONSTRUCTION OF EVACUATION CENTER-PHASE I - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF EVACUATION CENTER- PHASE I - CONSTRUCTION OF EVACUATION CENTER-PHASE 1 - CONSTRUCTION OF EVACUATION CENTER - UPGRADING OF LEVEL III WATER SYSTEM PROJECT 1,000,000.00 1,000,000.00 REHAB OF LEVEL III WATER SYSTEM 1,000,000.00 1,000,000.00 1493 SISON 500,000.00 - - - 12,000,000.00 - - - - - - - - - 12,500,000.00 PRODUCTION OF ORGANIC FERTILIZER 500,000.00 500,000.00 VARIOUS DILG PROJECTS 5,950,000.00 5,950,000.00 MUNICIPAL EVACUATION CENTER - TAGBAYANI EVACUATION CENTER - CONSTRUCTION OF RIVER FLOOD CONTROL (PHASE 3) - REHABILITATION AND SANITATION OF SISON WATER SYSTEM 6,050,000.00 6,050,000.00 1494 SOCORRO 3,500,000.00 - - - 6,200,000.00 - - - 2,800,000.00 - - - - - 12,500,000.00 CONSTRUCTION OF BRGY. FOOD TERMINAL 1,000,000.00 1,000,000.00 MARINE CULTURE/ FISH CAGE 600,000.00 600,000.00 NATIVE CHICKEN PRODUCTION 600,000.00 600,000.00 CONSTRUCTION OF FISH DRYER 600,000.00 600,000.00 CONSTRUCTION OFG BARANGAY FOOD TERMINAL - NUEVA ESTRELLA 700,000.00 700,000.00 VARIOUS DILG PROJECTS 5,500,000.00 5,500,000.00 CONSTRUCTION OF SEAWALL - STA. CRUZ - CONSTRUCTION OF SEAWALL - RIZAL - CONSTRUCTION - SERING - CONSTRUCTION OF SEA WALL - ALBINO TARUC - CONSTRUCTION OF SEA WALL - CONSTRUCTION OF WATER SYSTEM - HORNADO 700,000.00 700,000.00 CONSTRUCTION OF BAHAY TURISTA 700,000.00 700,000.00 CONSTRUCTION OF FLOATING RESTAURANT 700,000.00 700,000.00 DEVELOPMENT OF BUSAY FALLS 700,000.00 700,000.00 DEVELOPMENT OF SABANG GIANT MANGROVE FOREST 700,000.00 700,000.00 1495 SURIGAO CITY (CAPITAL) 5,500,000.00 - - 2,000,000.00 8,500,000.00 - 3,500,000.00 - 3,000,000.00 4,000,000.00 1,000,000.00 - 2,500,000.00 - 30,000,000.00 VARIOUS DA PROJECTS 5,500,000.00 5,500,000.00 PROVISION OF FARM MACHINERIES (TRACTOR, SEEDER, HARVESTER, RICE THRESHER, SHELLER, SOYA BEANS, EXTRUDER) - ESTABLISHMENT OF COLD STORAGE FACILITY - IMPROVEMENT/ REPAIR OF BARANGAY PORTS - ESTABLISHMENT OF BARANGAY BAGSAKAN CENTER - REPAIR AND REHABILITATION OF CLASSROOMS 2,000,000.00 2,000,000.00 ESTABLISHMENT OF EVACUATION CENTER 4,000,000.00 4,000,000.00 VARIOUS WATER PROJECTS 4,500,000.00 4,500,000.00 SALINTUBIG LEVEL II - MABUA - SALINTUBIG LEVEL II - SAN ROQUE - SALINTUBIG LEVEL II - BAYBAY - SALINTUBIG LEVEL II - BUENAVISTA - SALINTUBIG LEVEL II - DANAWAN - SALINTUBIG LEVEL II - LISONDRA - SALINTUBIG LEVEL II - NONOC - SALINTUBIG LEVEL II - CAGNOIG - SALINTUBIG LEVEL II - BALIBAYON - SALINTUBIG LEVEL II - AURORA - SALINTUBIG LEVEL II - SIDLAKAN - SALINTUBIG LEVEL II - ALANG-ALANG - SALINTUBIG LEVEL II - CANTIASAY - SALINTUBIG LEVEL II - TALISAY - COMPLETION OF LIBUAC HEALTH CENTER WITH BIRTHING FACILITY 1,000,000.00 1,000,000.00 CONSTRUCTION OF BARANGAY HEALTH CENTER WITH BIRTHING FACILITY - TALISAY 1,500,000.00 1,500,000.00 MNCHN 500,000.00 500,000.00 TRAINING OF HEALTH PROVIDERS ON BEMONC 500,000.00 500,000.00 CONSTRUCTION OF BEACH COTTAGES AND COMFORT ROOMS 1,000,000.00 1,000,000.00 CONSTRUCTION OF TOURISM PAVILLION 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM FOR THE YOUTH 500,000.00 500,000.00 CONSTRUCTION OF DAY CARE CENTERS AT PAYAWAN 2 LUNA, SAN PEDRO, SAN ROQUE 1,500,000.00 1,500,000.00 REPAIR/ UPGRADING OF DAY CARE - BALIBAYON, SAN ISIDRO 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS UPGRADING OF RESIDENTIAL CENTER FOR STREETCHILDREN 500,000.00 500,000.00 COMPLETION OF THE BAHAY PAG-ASA ANF EQUIPMENT COPLEMNTATION 1,000,000.00 1,000,000.00 ESTABLISHMENT OF OTOP EXPRESS STORE 500,000.00 500,000.00 ENTREPRENUERIAL CAPABILITY BUILDING AND LIVELIHOOD PROGRAM 500,000.00 500,000.00 COMMUNITY - BASED TRAINING FOR NHTS-PR FAMILIES WITH EQUIPMENT/ STARTER KITS AND VALUE FORMATION SEMINARS 500,000.00 500,000.00 SKILLS TRAINING FOR HEAVY EQUIPMENT OPERATORS WITH SIMULATION MACHINE 2,000,000.00 2,000,000.00 1496 TAGANA-AN 1,000,000.00 500,000.00 - 1,350,000.00 - - - - - 3,850,000.00 - - - 5,800,000.00 12,500,000.00 REHABILITATION OF HIMAMA-UG CIS 500,000.00 500,000.00 REHABILITATION OF CABONGA-AN SWIP 500,000.00 500,000.00 REHABILITATION OF BETO CIP 500,000.00 500,000.00 REPAIR OF 7 INSTRUCTIONAL ROOMS OF TAGANAAN CES 600,000.00 600,000.00 REPAIR OF SCHOOL LIBRARY AND HE BUILDING 750,000.00 750,000.00 SLP MICRO-ENTERPRISE/ CATERING SERVICES/ CARENDERIA 650,000.00 650,000.00 CONSTRUCTION OF BAHAY PAG-ASA FOR CICL 2,000,000.00 2,000,000.00 CONSTRUCTION OF GROUP HANDWASHING FACILITY 600,000.00 600,000.00 CONSTRUCTION OF OPDA 600,000.00 600,000.00 CORE LOCAL ROAD CONSTRUCTION - ROXAS 2,500,000.00 2,500,000.00 CONSTRUCTION OF ACCESS ROAD TO RELOCATION SITE 800,000.00 800,000.00 CORE LOCAL ROAD CONSTRUCTION - BAJAWA RD. 2,500,000.00 2,500,000.00 1497 TUBOD 1,300,000.00 4,000,000.00 - - 3,000,000.00 - - - - - - - - 4,200,000.00 12,500,000.00 POST-HARVEST FACILITY & EQUIPMENT (MECHANICAL DRYER) FOR TUFAMULCO 800,000.00 800,000.00 CONCRETING OF IRRIGATION LINE CANAL - TFIA 500,000.00 500,000.00 CONCRETING OF IRRIGATION LINE CANAL-MAFIA 1,000,000.00 1,000,000.00 CONCRETING OF IRRIGATION LINE CANAL-MOFIA 1,000,000.00 1,000,000.00 AGRO-PROCESSING FACILITIES AND EXPANDED AGRI-BUSINESS ACTIVITIES 500,000.00 500,000.00 CONCRETING OF IRRIGATION LINE CANAL - TCFIA 500,000.00 500,000.00 CONCRETING OF IRRIGATION LINE CANAL - TIFIA 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 3,000,000.00 3,000,000.00 FLOOD CONTROL-CONSTRUCTION OF DRAINAGE CANAL- 400 L.M. - FLOOD CONTROL - FLOOD CONTROL - FLOOD CONTROL - CONCRETING OF BARANGAY ROAD 2,000,000.00 2,000,000.00 CONCRETING OF ROAD W/ DRAINAGE CANAL 1,200,000.00 1,200,000.00 CONCRETING OF BARANGAY ROAD 1,000,000.00 1,000,000.00 SURIGAO DEL SUR 50,419,699.27 4,200,000.00 7,514,300.00 17,360,000.00 68,033,124.62 - 18,401,409.99 5,171,200.00 11,000,000.00 34,341,675.38 17,444,290.74 - 1,714,300.00 10,900,000.00 246,500,000.00 1498 BAROBO 1,630,000.00 - 500,000.00 1,910,000.00 2,600,000.00 - 2,460,000.00 500,000.00 - 2,200,000.00 700,000.00 - - - 12,500,000.00 VARIOUS DA PROJECTS 1,630,000.00 1,630,000.00 GROUPER CULTURE IN PEN - HOG GROWING AND FATTENING IN GUINHALINAN - POULTRY RAISING FOR IPS IN CAMPBAGANG - ACQUISITION MECHANICAL DRYER - RICE/DUCK PRODUCTION IN BRGYS. CAMP BAGANG, GUINHALINAN, SAN ROQUE, DUGHAN & TAMBIS - VERMI CULTURE PRODUCTION - RIVERBANK REHABILITATION - JAVIER ELEM. SCHOOL 500,000.00 500,000.00 REPAIR OF TWO ACADEMIC CLASSROOMS FOR BRGYS. CAUSWAGAN & RIZAL 600,000.00 600,000.00 GULAYAN SA PAARALAN - ALL 33 DAY CARE CENTERS, 31 ELEM. SCHOOLS & 7 PUBLIC SECONDARY SCHOOLS 710,000.00 710,000.00 REPAIR OF TWO UNITS SCHOOL ROOM 600,000.00 600,000.00 EVACUATION CENTER PHASE I 1,900,000.00 1,900,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM LEVEL-1 700,000.00 700,000.00 CONST. OF HEALTH STATION WITH HEALTH FACILITIES 1,200,000.00 1,200,000.00 CONST. OF HEALTH STATION WITH HEALTH FACILITIES 1,260,000.00 1,260,000.00 SARI SARI STORE FOR PWD 500,000.00 500,000.00 SENIOR CITIZEN & PWD DUPLEX BUILDING 1,200,000.00 1,200,000.00 CONST. OF DCC W/ IN-OUTDOOR FACILITIES 1,000,000.00 1,000,000.00 RURAL/MICRO ENTERPRISE DEVELOPMENT PROGRAM 700,000.00 700,000.00 1499 BAYABAS - 2,000,000.00 - - 10,500,000.00 - - - - - - - - - 12,500,000.00 IRRIGATION SYSTEM & BOX CULVERT 2,000,000.00 2,000,000.00 VARIOUS DILG PROJECTS 6,000,000.00 6,000,000.00 PROTECTION DIKE/SEA WALL - BOX CULVERT 3 UNITS - PROTECTION DIKE - PROTECTION DIKE/SEA WALL - WATER SYSTEM 1,500,000.00 1,500,000.00 WATER SYSTEM 1,500,000.00 1,500,000.00 WATER SYSTEM - EXPANSION 1,500,000.00 1,500,000.00 1500 CAGWAIT 1,000,000.00 - - 500,000.00 9,000,000.00 - - - - - 500,000.00 - - 1,500,000.00 12,500,000.00 PROVISION OF FARM IMPLEMENTS/TOOLS 500,000.00 500,000.00 DEEP SEA FISHING 500,000.00 500,000.00 REHABILITATION OF TAWAGAN ELEMENTARY SCHOOL CLASSROOM 500,000.00 500,000.00 VARIOUS DILG PROJECTS 2,000,000.00 2,000,000.00 CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE CANAL, RIPRAP AND BOX CULVERT AT PUROK 1, 2 & 4 OF TAWAGAN - CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM AT BACOLOD PROPER 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 EXPANDED AGRI-BUSINESS ACTIVITIES 500,000.00 500,000.00 CONSTRUCTION OF DRAINAGE CANAL AT THE BACK OF CEMPRON ELEMENTARY SCHOOL AT PUROK LOGGING ROAD & CEMPRON 1,500,000.00 1,500,000.00 1501 CANTILAN 3,300,000.00 - 800,000.00 500,000.00 1,500,000.00 - 1,000,000.00 500,000.00 500,000.00 500,000.00 500,000.00 - - 3,400,000.00 12,500,000.00 VARIOUS DA PROJECTS 3,300,000.00 3,300,000.00 IMPROVEMENT OF EXISTING IRRIGATION CANAL AT STATION 7+860 TO 9+852.50 - CONSTRUCTION OF SWIP FOR LANGCOGUE - LIVELIHOOD FISHING (PAKURA) AT SITIO AYOKE & BRGY. GENERAL ISLAND - REHABILITATION OF COLD STORAGE CENTER & ICE PLANT - MARINE PROTECTED AREA MANAGEMENT FOR BRGYS. SAN PEDRO, SITIO AYOKE, BRGY. GENERAL ISLAND - PURCHASE OF RICE TRANSPLANTER WITH ROTAVATOR FOR CANTILAN FARMERS IRRIGATOR - PURCHASE 4-WHEEL HARVESTER TO CANTILAN FARMERS IRRIGATOR - NURSERY ESTABLISHMENT FOR A.FALCATA AND RUBBER TREE REFO. AND PLANTATION DEV'T FOR BRGYS. CABAS-AN, BUNTALID & CABANGAHAN 800,000.00 800,000.00 REPAIR OF PALASAO ELEM. SCHOOL 500,000.00 500,000.00 SOURCE DEVELOPMENT AND INSTALLATION OF P.E. PIPE FROM SOURCE TO RESERVOIR 500,000.00 500,000.00 INSTALLATION OF POTABLE WATER SUPPLY (DRINKING) 500,000.00 500,000.00 REHABILITATION OF BAWASA WATER SUPPLY 500,000.00 500,000.00 RABBIES ELIMINATION 500,000.00 500,000.00 RN HEALS 500,000.00 500,000.00 LIVELIHOOD ASSISTANCE TO FORMER OFWAND DEPENDENTS TO ALL 17 BARRANGAYS 500,000.00 500,000.00 TOURISM SERVICE PROVIDED TRAINING COMMUNITY BASED TOURISM SKILLS TRAINING CONDUCTED MUNICIPAL WIDE 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION GROUNDS / PICNIC AREA OF THE MUNICIPAL ECOLOGICAL PARK 500,000.00 500,000.00 TRAINING ON FISH PROCESSING W/ START UP WORKING CAPITAL FOR BRGYS. LININTIAN, MAGOSILON & SAN PEDRO 500,000.00 500,000.00 CORE LOCAL ROAD FOR TIGABONG AND MAGASANG 500,000.00 500,000.00 INTERIOR ACCESS ROAD FOR TAPI-LANGCOGUE 1,000,000.00 1,000,000.00 CONSTRUCTION OF INTERIOR ACCESS ROAD FOR UYAY TO DOMOYOG 900,000.00 900,000.00 CONSTRUCTION OF INTERIOR ACCESS ROAD (1.5 KM) 1,000,000.00 1,000,000.00 1502 CARMEN 4,560,000.00 2,200,000.00 - 1,000,000.00 3,740,000.00 - - - - 1,000,000.00 - - - - 12,500,000.00 PURCHASE OF AGRICULTURAL FARM EQUIPMENTS FOR BARANGAYS PUYAT, POBLACION, ANTAO & CANCAVAN 500,000.00 500,000.00 ESTABISHMENT OF 3 UNITS MECHANICAL DRYER AT BGYS. POBLACION, ANTAO & CANCAVAN 1,050,000.00 1,050,000.00 CONSTRUCTION OF MULTI-URPOSE DRYING PAVEMENT 500,000.00 500,000.00 ORGANIC FERTILIZER PRODUCTION (NFTS) ESTABLSIHED AT 85,000.00 PER ESTABLISHED NFTS AT BRGYS. POBLACION, ANTAO, CANCAVAN, STA. CRUZ, SAN VICENTE & PUYAT 510,000.00 510,000.00 CONCRETING OF IRRIGATION CANAL: A. KABAHAWAN AREA: 800 LM B. PAMIBIHAN AREA: 600 LM C. MANTITINAWAREA: 250 LM D. MALONONG AREA: 750 LM 2,000,000.00 2,000,000.00 STA. CRUZ COMMUNAL IRRIGATION SYSTEM 1,200,000.00 1,200,000.00 CANCAVAN COMMUNAL IRRIGATION SYSTEM 1,000,000.00 1,000,000.00 REHABILITATION OF 10 CLASSROOMS = ALL BARANGAYS 500,000.00 500,000.00 REHAB OF OLD SSIT - SCHOOL BUILDING 500,000.00 500,000.00 VARIOUS DILG PROJECTS 3,740,000.00 3,740,000.00 CONSTRUCTION OF PUBLIC MARKET - CONSTRUCTION OF GABION FOR RIVER CONTROL AT CARMEN RIVER - CONSTRUCTION OF ONE UNIT PROTECTIVE SERVICES 1,000,000.00 1,000,000.00 1503 CARRASCAL 1,000,000.00 - - 3,000,000.00 4,000,000.00 - 500,000.00 - - - 4,000,000.00 - - - 12,500,000.00 SUSTAINABLE FISHERY BASED LIVELIHOOD AND BUSINESS INVESTMENT 500,000.00 500,000.00 AGRI. ECONOMIC ENTERPRISE (PRODUCTION NITCHING (PALAY) FOR BARANGAYS PANIKIAN, BACOLOD, TAGANITO, GAMUTON & ADLAY 500,000.00 500,000.00 BASIC EDUCATION FACILITIES/ REPAIR/HABILATATION OF CLASSROOMS 3,000,000.00 3,000,000.00 VARIOUS DILG PROJECTS 4,000,000.00 4,000,000.00 CONSTRUCTION OF SEAWALL (BAYBAY SECTION) FOR DISASTER MITIGATION (STORM SURGE) - CONSTRUCTION OF RIVER DIKE (CARRASCAL-PANIKIAN RIVER) EMBERCADERO- DOYOS SECTION - IMPROVEMENT OF MUNICIPAL CEMETERY CASKET CUBICLE - OPERATIONALIZATION OF DISASTER RISK REDUCTION MANAGEMENT OPERATION CENTER PHASE II - HEALTH WELLNESS & FITNESS EQUIPMENT/ FACILITIES (SENIOR CITIZEN) 500,000.00 500,000.00 TULONG PANGHANAP BUHAY PARA SA MASA 4,000,000.00 4,000,000.00 1504 CITY OF BISLIG 7,437,500.00 - - - - - 1,700,000.00 - - 7,362,500.00 5,000,000.00 - - - 21,500,000.00 VARIOUS DA PROJECTS 7,437,500.00 7,437,500.00 HVC PLANTATION (CACAO AND COFFEE) - FEED MILL - BACKYARD POULTRY/ SWINE GROWERS PROGRAM - CONSTRUCTION OF FISHPEN/ FISHCAGE - Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS ORGANIC VEGETABLE PRODUCTION - EQUIPMENT FOR SOIL ANALYSIS - MUD CRAB FATTENING - PROVISION OF FRY, FERTILIZER AND FEEDS - ACQUISITION / PURCHASE OF ADDITIONAL HEALTH FACILITIES & MEDICAL EQUIPMENT/ACCESSORIES/WATER ANALYSIS EQUIPMENT 700,000.00 700,000.00 CONSTRUCTION OF HEALTH STATION (PHASE II) 1,000,000.00 1,000,000.00 CASH FOR TRAINING/SKILLS PROGRAM 500,000.00 500,000.00 VARIOUS KC PROJECTS 6,862,500.00 6,862,500.00 EVACUATION CENTER - CONSTRUCTION BAHAY PAG-ASA FOR CICL - CONSTRUCTION OF BOYS TOWN (DROP IN CENTER) - CONSTRUCTION OF WOMEN'S TRAINING & DISPLAY CENTER - CONSTRUCTION OF WOMEN'S CRISES CENTER - REPAIR OF TAWAG & PRODUCTIVITY FOR SPECIAL CHILDREN CENTER - REPAIR AND REHAB OF DAY CARE CENTERS - VARIOUS DTI PROJECTS 5,000,000.00 5,000,000.00 SEA SHELLS HANDICRAFT FOR BCCI - PROVISION OF PROCESSED FOOD FACILITIES FOR BCCI - ESTABLISHMENT OF FISH PROCESSING FACILITIES (BOTTLED BANGUS AND TUNA - 1505 CORTES 3,400,000.00 - 500,000.00 1,700,000.00 1,600,000.00 - 1,800,000.00 - - 500,000.00 3,000,000.00 - - - 12,500,000.00 PRE AND POST HARVEST FACILITIES 1,000,000.00 1,000,000.00 TRADING POST FOR AGRI-PRODUCTS 900,000.00 900,000.00 COCONUTT INTERCROPPING W/ HVCCS 500,000.00 500,000.00 FISH & AQUACULTURE 1,000,000.00 1,000,000.00 NGP: REFORESTATION 500,000.00 500,000.00 REHAB OF COMPUTER LAB 700,000.00 700,000.00 REPAIR/ REHAB OF CLASSROOMS AND EVACUATION CENTERS 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 600,000.00 600,000.00 EVACUATION FACILITY REHAB - REHAB. OF FOOTBRIDGE - REHAB OF WATER SYSTEM 500,000.00 500,000.00 CSO ORGANIZATION/ STRENGTHENING 500,000.00 500,000.00 BIRTHING FACILITY INCLUDING ITS EQUIPMENT 1,000,000.00 1,000,000.00 RENOVATION OF BHS 800,000.00 800,000.00 RENOVATION OF DAY CARE CENTER 500,000.00 500,000.00 RUMEPP: ESTABLISHMENT OF COMMERCIAL CENTER 3,000,000.00 3,000,000.00 1506 HINATUAN 3,400,000.00 - - 1,000,000.00 5,100,000.00 - - - - 1,500,000.00 - - - 1,500,000.00 12,500,000.00 CONSTRUCTION OF 500 L.M WHARF 3,400,000.00 3,400,000.00 REHABILITATION OF TAGASAKA ES BUILDING 1,000,000.00 1,000,000.00 VARIOUS DILG PROJECTS 2,600,000.00 2,600,000.00 CONSTRUCTION OF 150 L.M DRAINAGE SYSTEM - CONSTRUCTION OF EVACUATION CENTER - CONSTRUCTION OF 300 L.M. SEA WALL - CONSTRUCTION OF LEVEL II WATER SYSTEM 2,500,000.00 2,500,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 CONSTRUCTION OF DAY CARE CENTER 750,000.00 750,000.00 CONCRETING OF 0.15KM BARANGAY ROAD 1,500,000.00 1,500,000.00 1507 LANUZA - - - - 1,000,000.00 - 2,500,000.00 - - 4,000,000.00 - - 500,000.00 4,500,000.00 12,500,000.00 CONSTRUCTION OF 500 LINEAR METERS OF DRAINAGE CANAL WITH CULVERT 1,000,000.00 1,000,000.00 REHABILITATION OF BRGY. HEALTH STATIONS (IN AGSAM, HABAG, BOCAWE, GAMUTON) 2,500,000.00 2,500,000.00 CONSTRUCTION OF EVACUATION CENTER 4,000,000.00 4,000,000.00 ROAD CONCRETING (IN POBLACION) 4,500,000.00 4,500,000.00 LIVELIHOOD AND SKILLS TRAINING BY SECTOR(DRIVING, WELDING, HARDWARE SERVICES, ETC.) 500,000.00 500,000.00 1508 LIANGA 5,600,000.00 - 5,000,000.00 700,000.00 - - - - - 1,200,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 5,600,000.00 5,600,000.00 FISH PORT REHAB AND EXTENSION OF FISH PORT - RICE AND CORN PLANTATION - ABACA PLANTATION - SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD AND OTHER AGRI-FISHERY BUSINESS (LIVELIHOOD PROGRAM) - ORGANIC VEGETABLE FARMING (EXPANDED AGRI-BUSINESS ACTIVITIES) - INFRASTRUCTURE SUPPORT TO AGRI AND PROCUREMENT OF FARM'S EQUIPMENT - BAMBOO PLANTATION (NGP) 5,000,000.00 5,000,000.00 BASIC EDUCATION FACILITIES 700,000.00 700,000.00 PROTECTIVE SERVICES 1,200,000.00 1,200,000.00 1509 LINGIG 5,300,000.00 - - - 4,000,000.00 - 700,000.00 - - 2,500,000.00 - - - - 12,500,000.00 POST HARVEST FACILITIES & EQUIPT. OF RICE/CORN MILL WAREHOUSE, SOLAR DRYER & MECHANICAL DRYER 1,600,000.00 1,600,000.00 INFRASTRUCTURE SUPPORT TO AGRICULTURE & FISHER PRODUCTION AND DEVELOPMENT (PROCUREMENT OF MOTORIZED BOATS & FISHNETS) 1,000,000.00 1,000,000.00 ORGANIC FERTILIZER PRODUCTION 500,000.00 500,000.00 SUSTAINABLE AGRI-FISHERY BASED LIVELIHOOD & OTHER AGRI- FISHERY BUSINESS INVESTMENTS (ANIMAL FEED PRODUCTION) 1,200,000.00 1,200,000.00 FARM IMPLEMENTS/TOOLS (RICE, CORN, VEGETABLES, BANANA, ROOTCROPS & OTHERS) 1,000,000.00 1,000,000.00 SALINTUBIG (CONSTRUCTION OF POTABLE WATER SYSTEM-LEVEL II) 4,000,000.00 4,000,000.00 HEALTH FACILITIES ENHANCE PROGRAM (PROCUREMENT OF MEDICAL EQUIPMENT, INSTRUMENTS) 700,000.00 700,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (BIGASAN NG BAYAN) 1,000,000.00 1,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS KC-NCDDP PROJECTS (CONSTRUCTION OF DRAINAGE CANAL & BOX CULVERTS) FOR BRGYS. POBLACION, BONGAN & MAHAYAHAY 1,500,000.00 1,500,000.00 1510 MADRID 3,200,000.00 - - 4,550,000.00 - - 3,092,000.00 - - 1,658,000.00 - - - - 12,500,000.00 VARIOUS DA PROJECTS 3,200,000.00 3,200,000.00 PURCHASE OF MECHANICAL DRYER - VEGETABLE PRODUCTION AND SOYBEANS PRODUCTION AND PROCESSING - ORGANIC FERTILIZER PRODUCTION - IRIGATION PROJECT - RUBBER PLANTATION - ECO TOURISM AND MANGROOVE - PROVISION OF MOTORIZED FISHING BOATS AND PROVISION OF FISHING NETS/GEARS - REPAIR OF CLASSROOMS FOR 13VBRGYS 3,900,000.00 3,900,000.00 REPAIR OF CLASSROOMS - MNHS 500,000.00 500,000.00 GULAYAN SA PAARALAN - ALL 15 ELEM SCHOOL 150,000.00 150,000.00 CONSTRUCTION OF BRGY. HEALTH SANITATION 2,592,000.00 2,592,000.00 MOBILIZATION OF COMMUNITY HEALTH TEAM TRAININGS; WATSAN, STI/HIV/ AIDS 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM AND BASIC BUSINESS MGT. SKILLS TRNG. 508,000.00 508,000.00 REPAIR/UPGRADING OF DAY CARE CENTER FOR BRGYS. SAN VICENTE, BAYOGO, SITIO 650,000.00 650,000.00 CONST. OF WOMEN CRISIS CENTER 500,000.00 500,000.00 1511 MARIHATAG - - - - 3,500,000.00 - - - 9,000,000.00 - - - - - 12,500,000.00 VARIOUS DILG PROJECTS 2,000,000.00 2,000,000.00 CONSTRUCTION OF BARANGAY DRAINAGE SYSTEM - REHABILIATION OF RIVER DIKE AT PUROK 1 - CONSTRUCTION OF DISASTER EVACUATION CENTER - CONSTRUCTION OF DRAINAGE SYSTEM - CONSTRUCTION OF RCCP - CONSTRUCTION OF DRAINAGE CANAL - COMPLETION OF SEA WALL - REHABILITATION OF WATER SYSTEM 500,000.00 500,000.00 REHABILITATION OF WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF LEVEL 2 WATER SYSTEM 500,000.00 500,000.00 CONSTRUCTION OF THREE (3) SETS OF ZIPLINE/WAKE BOARDING TOWERES & OTHER FACILITIES 9,000,000.00 9,000,000.00 1512 SAN AGUSTIN 500,000.00 - - 2,000,000.00 7,693,124.62 - - - - 1,706,875.38 600,000.00 - - - 12,500,000.00 PROVSION OF 5 UNITS FISHING BOAT AND FISHING ACCESSORIES 500,000.00 500,000.00 REHABILITATION OF 3 UNITS SCHOOL CLASSROOMS 1,200,000.00 1,200,000.00 RENOVATION OF 2 UNIT SCHOOL CLASSROOMS 800,000.00 800,000.00 VARIOUS DILG PROJECTS 3,281,968.98 3,281,968.98 CONSTRUCTION OF CONCRETE DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE CANAL - CONSTRUCTION OF CONCRETE DRAINAGE CANAL - CONSTRUCTION OF CONCRETE DRAINAGE CANAL - CONSTRUCTION OF CONCRETE DRAINAGE CANAL - INSTALLATION OF 500-M RIVERDIKE - IMPROVEMENT OF WATER SYSTEM 2,911,155.64 2,911,155.64 IMPROVEMENT OF WATER SYSTEM 500,000.00 500,000.00 IMPROVEMENT OF WATER SYSTEM 1,000,000.00 1,000,000.00 CONSTRUCTION OF EVACUATION CENTER 1,706,875.38 1,706,875.38 COCO COIR PRODUCTION 600,000.00 600,000.00 1513 SAN MIGUEL 700,000.00 - - - 600,000.00 - 2,400,000.00 - 1,500,000.00 5,800,000.00 1,000,000.00 - 500,000.00 - 12,500,000.00 RICE & CORN MILL WITH SOLAR DRYER 700,000.00 700,000.00 REHABILIATION OF SAN ROQUE WATER SYSTEM 600,000.00 600,000.00 CONSTRUCTION OF 1 UNIT BRGY HEALTH STATION 800,000.00 800,000.00 CONSTRUCTION OF BRGY HEALTH STATION 800,000.00 800,000.00 CONSTRUCTION OF BRGY. HEALTH STATION 800,000.00 800,000.00 DEVELOPMENT OF INADYASAN FALLS (PHASE 1) 800,000.00 800,000.00 DEVELOPMENT OF TOURISTT SPOT (PAHSE II) 700,000.00 700,000.00 CONSTRUCTION OF DRAINAGE 700,000.00 700,000.00 1 UNIT DAY CARE CENTER 800,000.00 800,000.00 VARIOUS DSWD PROJECTS 4,300,000.00 4,300,000.00 RIVER PROTECTION DIKE CONTRUCTION - CONCRETING OF DRAINAGE CANAL - CONSTRUCTION OF PATHWAY FROM RIVERSIDE TO BRGY. PROPER - CONCRETING OF DRAINAGE CANAL - CONSTRUCTION OF DRAINAGE OF 100 HAS ABANDONED RICEFIELD - CONSTRUCTION OF DAYCARE CENTER PUROK 2 - CONSTRUCTION OF OPEN CONCRETE DRAINAGE/CANAL - CONSTRUCTION OF APUGAN DAYCARE CENTER - CONSTRUCTION OF CONCRETE DRAINAGE / CANAL - ELECTRIC STREET LIGHTS - ABACA EXPANSION 1,000,000.00 1,000,000.00 LIVELIHOOD TRAINING OF HANDICRAFT, SMALL ENGINE, COMPUTER LITERARY, AGRI-BUSINESS 500,000.00 500,000.00 1514 TAGBINA 3,000,000.00 - - - 5,800,000.00 - - - - 3,700,000.00 - - - - 12,500,000.00 LIVELIHOOD: PURCHASE OF FARM ANIMALS (CARABAO) 2,500,000.00 2,500,000.00 LIVELIHOOD: SUPPORT TO RIC 500,000.00 500,000.00 VARIOUS DILG PROJECTS 1,200,000.00 1,200,000.00 CONSTRUCTION OF CONCRETE DRAINAGE CANAL - CONSTRUCTION OF CONCRETE DRAINAGE CANAL - CONSTRUCTION OF LEVEL II WATER SYSTEM 1,300,000.00 1,300,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,300,000.00 1,300,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS EXPANSION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 EXPANSION OF LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 LIVELIHOOD SUPPORT TO THE TRANSPORT SECTOR 500,000.00 500,000.00 CONSTRUCTION OF EVACUATION CENTER 1,200,000.00 1,200,000.00 CONSTRUCTION OF EVACUATION CENTER 1,200,000.00 1,200,000.00 CONSTRUCTION OF BHS 800,000.00 800,000.00 1515 TAGO 3,500,000.00 - - - 7,400,000.00 - 500,000.00 600,000.00 - - 500,000.00 - - - 12,500,000.00 COLD STORAGE (REFER VAN) 1,000,000.00 1,000,000.00 BANGUS HATCHERY & INLAND FISH SANCTUARY ESTABLISHMENT 1,000,000.00 1,000,000.00 PROVISION OF POST HARVEST FACILITIES (1. CONS. OF 5 UNITS SOLARY DRYER; 2. P URCHASE OF 5 UNITS SHALLOWTUBE WHEEL) 800,000.00 800,000.00 ESTABLISHMENT OF ABACA / RUBBER PLANTATION AND PROCUREMENT OF 5 UNITS STRIPPING MACHINE 700,000.00 700,000.00 VARIOUS DILG PROJECTS 5,400,000.00 5,400,000.00 CONSTRUCTION OF PWS LEVEL II - CONSTRUCTION OF PWS LEVEL II - CONSTRUCTION OF PWS LEVEL II - CONSTRUCTION OF PWS LEVEL II - CONSTRUCTION OF PWS LEVEL II - CONSTRUCTION OF PWS LEVEL III - CONSTRUCTION OF PWS LEVEL II - PURCHASE OF DISASTER AND RESCUE EQUIPMENT (MOTOR VEHICLES) - IMPROVEMENT OF DAYOAN LEVEL II WATER SYSTEM 1,000,000.00 1,000,000.00 INSTALLATION OF WATER PIPELINE 500,000.00 500,000.00 IMPROVEMENT OF GAMUL LEVEL II POTABLE WATER SYSTEM 500,000.00 500,000.00 PURCHASE OF MEDICINES (BOTIKA SA BARANGAY) 500,000.00 500,000.00 ENTERPRENUERIAL LIVELIHOOD PROJECT (MOTORCYCLE SPARE PARTS & ACCESSORIES STORE) AND SKILLS TRAINING ON MASONRY, CARPENTRY, ELECTRICIAN, PAINTING & WELDING 600,000.00 600,000.00 ENTERPRENUERIAL LIVELIHOOD PROJECT (HANDICRAFT MAKING & DRESS, RUB MAKING WITH COMPLETE ACCESSORIES) 500,000.00 500,000.00 1516 TANDAG CITY 2,892,199.27 - 714,300.00 500,000.00 - - 1,749,409.99 3,571,200.00 - 714,300.00 1,644,290.74 - 714,300.00 - 12,500,000.00 VARIOUS DA PROJECTS 2,892,199.27 2,892,199.27 COPRA AND PALAY TRADING - WAREHOUSE & TRADING POST FOR AGRI PRODUCTS - FRUIT TREES PRODUCTION - FISHING BOATS & GEARS - MARKET AUCTION STALLS & MEAT SHOP - OFFSHORE FISHING WITH FISH SHELTER PROJECT FOR BOPOMCO - RIVERBANK PROTECTION ON BAMBOO PRODUCTION 714,300.00 714,300.00 GULAY SA PAARALAN 500,000.00 500,000.00 HEALTH SERVICE DELIVERY PACKAGE 1,749,409.99 1,749,409.99 WOMEN TRAINING & LIVELIHOOD CENTER 3,571,200.00 3,571,200.00 YOUTH'S IGB SA BASURA 714,300.00 714,300.00 OTOP STORE EXPRESS 500,000.00 500,000.00 INDUSTRY CLUSTERING DEV'T PROGRAM 1,144,290.74 1,144,290.74 COMMUNITY TRAININGS FOR LIVELIHOOD 714,300.00 714,300.00 ARMM - - 8,500,000.00 91,627,590.00 - 40,945,000.00 50,328,119.00 - - 106,519,835.00 - 13,000,000.00 - 3,000,000.00 313,920,544.00 BASILAN - - - 4,765,000.00 - 5,500,000.00 2,800,000.00 - - 3,561,000.00 - - - - 16,626,000.00 1517 AKBAR - - - 2,265,000.00 - - 1,000,000.00 - - 561,000.00 - - - - 3,826,000.00 GULAYAN SA PAARALAN 350,000.00 350,000.00 PROVISION OF SCHOOL FURNITURE AND COMPUTER EQUIPMENT 1,165,000.00 1,165,000.00 REHABILITATION OF SCHOOL BUILDING 750,000.00 750,000.00 TB DOTS 1,000,000.00 1,000,000.00 LIVELIHOOD TRAINING PROGRAM (BAKING, COOKING, DRESS MAKING, AUTOMOTIVE,WELDING, CARPENTRY 561,000.00 561,000.00 1518 LAMITAN CITY - - - 2,500,000.00 - - - - - 1,200,000.00 - - - - 3,700,000.00 REHABILITATION OF CLASSROOM AND PROVISION OF FURNITURES AND FIXTURES 2,500,000.00 2,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - FOOD AND FISH VENDOR 1,200,000.00 1,200,000.00 1519 LANTAWAN - - - - - - 1,000,000.00 - - - - - - - 1,000,000.00 BOTIKA SA BARANGAY 1,000,000.00 1,000,000.00 1520 SUMISIP - - - - - - 800,000.00 - - 1,300,000.00 - - - - 2,100,000.00 PROVISION OF MEDICAL SUPPLIES 800,000.00 800,000.00 COOPERATIVE FOR CAPITAL SEEDLING 500,000.00 500,000.00 SKILLS TRAINING FOR WOMEN AND YOUTH-GARMENT SEWIN, BAKING, WEAVING YAKAN NATIVE CLOTH, LEADERSHIP TRAINING AND FINANCIAL MANAGEMENT 800,000.00 800,000.00 1521 TABUAN - - - - - 4,000,000.00 - - - - - - - - 4,000,000.00 HOUSEHOLDE ELECTRIFICATION PROGRAM SOLAR PHOTOVOLTAIC HOME SYSTEM 2 20,000/HH 1,500,000.00 1,500,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM (HEP) 2,500,000.00 2,500,000.00 1522 TIPO-TIPO - - - - - 1,500,000.00 - - - 500,000.00 - - - - 2,000,000.00 INSTALLATION OF SOLAR POWERED ELECTRICITY 1,500,000.00 1,500,000.00 TRAINING ON BANANA FOOD PROCESSING AND FOOD PRESERVATION 500,000.00 500,000.00 LANAO DEL SUR - - 500,000.00 21,915,590.00 - 21,695,000.00 7,138,419.00 - - 29,970,835.00 - - - - 81,219,844.00 1523 BACOLOD KALAWI - - - 500,000.00 - 2,195,000.00 - - - 1,000,000.00 - - - - 3,695,000.00 BASIC EDUCATION FACILITIES: PROVISION OF SCHOOL FURNITURES 500,000.00 500,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM: SOLAR LIGHTS 2,195,000.00 2,195,000.00 SUSTAINABLE LIVELIHOOD PROGRAMS-MICROENTERPRISE DEVELOPMENT TRACK 1,000,000.00 1,000,000.00 1524 BINIDAYAN - - - 500,000.00 - - - - - - - - - - 500,000.00 BASIC EDUCATION FACILITIES: REPAIR AND REHABILITATION OF 5 UNIT CLASSROOMS 500,000.00 500,000.00 1525 BUMBARAN - - - 700,000.00 - - - - - - - - - - 700,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS BASIC EDUCATION FACILITIES: REPAIR/REHAB OF CLASSROOMS AND PROVISION OF SCHOOL FACILITIES 700,000.00 700,000.00 1526 GANASSI - - - - - - - - - 2,000,000.00 - - - - 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: LIVESTOCK POULTRY RAISING 2,000,000.00 2,000,000.00 1527 KAPAI - - - 1,500,000.00 - 4,500,000.00 - - - - - - - - 6,000,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS 1,500,000.00 1,500,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM 4,500,000.00 4,500,000.00 1528 KAPATAGAN - - - 1,300,000.00 - - - - - 1,250,000.00 - - - - 2,550,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHAB OF CLASSROOMS 1,300,000.00 1,300,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SEA-K): PROVISION OF CAPITAL FOR LIVELIHOOD 1,250,000.00 1,250,000.00 1529 LUMBA-BAYABAO (MAGUING) - - - - - 15,000,000.00 - - - - - - - - 15,000,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM: PROVISION OF HYDRO ELECTRIC POWER SUPPLY 15,000,000.00 15,000,000.00 1530 LUMBACA UNAYAN - - - 2,708,154.00 - - 738,419.00 - - 3,446,572.00 - - - - 6,893,145.00 BASIC EDUCATION FACILITIES: REPAIR/REHAB OF CLASSROOMS AND PROVISION OF SCHOOL FACILITIES/FURNITURES 2,708,154.00 2,708,154.00 HEALTH FACILITIES ENHANCEMENT PROGRAM: PROVISION OF RHU BASIC EQUIPMENTS & INSTRUMENTS (OPB) 738,419.00 738,419.00 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS: CONSTRUCTION OF DAY CARE CENTERS 3,446,572.00 3,446,572.00 1531 LUMBAYANAGUE - - - - - - - - - 2,800,000.00 - - - - 2,800,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: LIVELIHOOD SUPPORT TO COOPERATIVES 1,500,000.00 1,500,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS: CONSTRUCTION OF DAY CARE CENTER 1,300,000.00 1,300,000.00 1532 MADALUM - - - 3,000,000.00 - - - - - - - - - - 3,000,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHAB OF CLASSROOMS 3,000,000.00 3,000,000.00 1533 MADAMBA - - - 2,000,000.00 - - - - - - - - - - 2,000,000.00 BASIC EDUCATION FACILITIES: REPAIR OF CLASSROOM SCHOOL BUILDING WITH TOILET AND WATER SANITATION 2,000,000.00 2,000,000.00 1534 MAGUING - - - 3,000,000.00 - - - - - 3,000,000.00 - - - - 6,000,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHAB OF CLASSROOMS AND PROVISION OF SCHOOL FURNITURES 3,000,000.00 3,000,000.00 PROTECTIVE SERVICES-INFRASTRUCTUREPROJECTS: CONSTRUCTION OF DAY CARE CENTERS 3,000,000.00 3,000,000.00 1535 MALABANG - - - - - - - - - 2,000,000.00 - - - - 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: PROVISION OF CAPITAL ASSISTANCE 2,000,000.00 2,000,000.00 1536 MARANTAO - - 500,000.00 2,000,000.00 - - 1,000,000.00 - - 2,000,000.00 - - - - 5,500,000.00 NATIONAL GREENING PROGRAM: TREE PLANTING 500,000.00 500,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHAB OF CLASSROOMS AND PROVISION OF SCHOOL FURNITURES 2,000,000.00 2,000,000.00 COMMUNITY HEALTH TEAM: MOBILIZING CHTS 300,000.00 300,000.00 DENGUE CONTROL: TRAINING FOR CERTIFIED POST APPLICATION 200,000.00 200,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION: IMPROVED PERFORMANCE OF HEALTH SERVICES 300,000.00 300,000.00 TB CONTROL 200,000.00 200,000.00 SUSTAIBLE LIVELIHOOD PROGRAM: SKILLS TRAINING AND PROVISION OF SEED CAPITAL 2,000,000.00 2,000,000.00 1537 MASIU - - - - - - 500,000.00 - - 500,000.00 - - - - 1,000,000.00 CONSTRUCTION OF BIRTHING FACILITY WITH CR 500,000.00 500,000.00 PROTECTIVE SERVICES- INFRA PROJECTS 500,000.00 500,000.00 1538 MULONDO - - - - - - 2,400,000.00 - - - - - - - 2,400,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM: CONSTRUCTION OF BRGY. HEALTH STATIONS/CENTER 2,400,000.00 2,400,000.00 1539 PAGAYAWAN (TATARIKAN) - - - 1,200,000.00 - - - - - - - - - - 1,200,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHAB OF SCHOOL BUILDINGS & CLASSROOMS 1,200,000.00 1,200,000.00 1540 PICONG - - - - - - 2,500,000.00 - - - - - - - 2,500,000.00 HEALTH FACILITIES EHANCEMENT PROGRAM: UPGRADING OF HEALTH FACILITIES 2,500,000.00 2,500,000.00 1541 SAGUIARAN - - - 2,507,436.00 - - - - - 446,263.00 - - - - 2,953,699.00 BASIC EDUCATION FACILITIES: REPAIR/REHAB OF SCHOOL BUILDINGS 2,507,436.00 2,507,436.00 SUSTAINABLE LIVELIHOOD PROGRAM: LIVELIHOOD PROJECT FOR WOMEN 446,263.00 446,263.00 1542 TAGOLOAN II - - - - - - - - - 1,000,000.00 - - - - 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM: PROVISION OF CAPITAL 1,000,000.00 1,000,000.00 1543 TAMPARAN - - - - - - - - - 5,028,000.00 - - - - 5,028,000.00 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS: CONSTRUCTION OF GROUP HANDWASHING FACILITY IN DAY CARE CENTERS 5,028,000.00 5,028,000.00 1544 TUGAYA - - - 1,000,000.00 - - - - - 5,500,000.00 - - - - 6,500,000.00 INNOVATION PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM- MICRO ENTERPRISE 2,000,000.00 2,000,000.00 SLP- EMPLOYMENT FACILITATION TRACK 1,500,000.00 1,500,000.00 PROTECTIVE-SERVICES-INFRA PROJECTS: CONSTRUCTION OF DAY CARE CENTER 1,000,000.00 1,000,000.00 PROTECTIVE-SERVICES-INFRA PROJECTS: CONSTRUCTION OF WOMEN CRISIS CENTER 1,000,000.00 1,000,000.00 MAGUINDANAO - - 3,000,000.00 30,447,000.00 - - 26,409,000.00 - - 25,263,000.00 - 13,000,000.00 - - 98,119,000.00 1545 AMPATUAN - - - - - - 3,000,000.00 - - - - - - - 3,000,000.00 CONSTRUCTION OF BIRTHING CENTER 3,000,000.00 3,000,000.00 1546 BULUAN - - - 1,000,000.00 - - 500,000.00 - - - - 500,000.00 - - 2,000,000.00 BASIC EDUCATION FACILITY (PROVISION OF SCHOOL FURNITURE AND EQUIPMENT) 500,000.00 500,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS BASIC EDUCATION FACILITY (PROVISION OF SCHOOL FURNITURE) 500,000.00 500,000.00 RN HEALS 500,000.00 500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 500,000.00 500,000.00 1547 DATU ABDULLAH SANGKI - - - - - - 3,600,000.00 - - - - - - - 3,600,000.00 CONSTRUCTION OF BARANGAY HEALTH STATION 3,600,000.00 3,600,000.00 1548 DATU ANGGAL MIDTIMBANG - - - 2,500,000.00 - - - - - - - - - - 2,500,000.00 REPAIR AND REHABILITATION OF PUBLIC SCHOOL BUILDINGS 2,500,000.00 2,500,000.00 1549 DATU BLAH T. SINSUAT - - - 2,500,000.00 - - - - - - - 2,000,000.00 - - 4,500,000.00 PROVISION OF MOTORIZED BANCA & FISHING GEARS - REHABILITATION/REPAIR OF SCHOOL BUILDING 2,500,000.00 2,500,000.00 BRGY LINE ENHANCEMENT PROGRAM 2,000,000.00 2,000,000.00 1550 DATU ODIN SINSUAT (DINAIG) - - - 1,700,000.00 - - 4,693,000.00 - - 2,220,000.00 - - - - 8,613,000.00 BASIC EDUCATION FACILITIES - REPAIR/REHABILITATION OF CLASSROOMS 1,200,000.00 1,200,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT ALAM PROGRAM 500,000.00 500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,800,000.00 1,800,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 625,000.00 625,000.00 NURSES DEPLOYMENT PROGRAM (RN HEALS) 576,000.00 576,000.00 RURAL HEALTH MIDWIFE PLACEMENT PROGRAM 1,080,000.00 1,080,000.00 TB CONTROL 612,000.00 612,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) MICROENTERPRISE DEVELOPMENT TRACK (LEVEL 1) 1,000,000.00 1,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM (SLP) EMPLOYMENT FACILITATION TRACK 720,000.00 720,000.00 PROTECTIVE SERVICES-CAPACITY BUILDING PROJECTS 500,000.00 500,000.00 1551 DATU PAGLAS - - - 6,000,000.00 - - 2,500,000.00 - - 1,500,000.00 - - - - 10,000,000.00 BASIC EDUCATION FACILITIES - REPAIR/REHABILITATION OF CLASSROOMS, PROVISION OF SCHOOL FURNITURE 6,000,000.00 6,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 2,500,000.00 2,500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 1,500,000.00 1,500,000.00 1552 DATU SALIBO - - - - - - - - - 2,000,000.00 - - - - 2,000,000.00 LIVELIHOOD PROJECT 2,000,000.00 2,000,000.00 1553 DATU SAUDI-AMPATUAN - - - 1,000,000.00 - - - - - - - - - - 1,000,000.00 BASIC EDUCATION FACILITIES - REPAIR AND REHABILITATION OF 3 CLASSROOMS 1,000,000.00 1,000,000.00 1554 DATU UNSAY - - - 3,400,000.00 - - - - - - - - - - 3,400,000.00 REPAIR/REHABILITATION AND IMPROVEMENT OF 1 UNIT 2 CL SCHOOL LIBRARY/COMPUTER BUILDING, COMPLETION OF 1 SCHOOL COVERED STAGE AND PROVISION OF SCHOOL FURNITURE AND SCHOOL STAGE FACILIITIES OF DATU UNSAY CENTRAL ELEMENTARY SCHOOL 3,400,000.00 3,400,000.00 1555 GUINDULUNGAN - - - - - - 2,000,000.00 - - - - - - - 2,000,000.00 MASSIVE HEALTH ADVOCACY PROGRAM/CHT 2,000,000.00 2,000,000.00 1556 KABUNTALAN (TUMBAO) - - - 860,000.00 - - 1,346,000.00 - - - - - - - 2,206,000.00 REHABILITATION OF SCHOOL BUILDING 700,000.00 700,000.00 GULAYAN SA PAARALAN 160,000.00 160,000.00 RNHEALS SUPPORT 96,000.00 96,000.00 TRAINING CUM DEVELOPMENT ON HEALTH EMERGENCY MANAGEMENT 500,000.00 500,000.00 TRAINING CUM DEVELOPMENT ON MATERNAL, NEONATAL, CHILD HEALTH AND NUTIRITION (MNCHN) 750,000.00 750,000.00 1557 MAMASAPANO - - - 1,000,000.00 - - 1,000,000.00 - - 2,000,000.00 - - - - 4,000,000.00 REPAIR/REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 500,000.00 500,000.00 MATERNAL, NEONATAL, CHILD HEALTH AND NUTRITION (MNCHN) 500,000.00 500,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,000,000.00 2,000,000.00 1558 MATANOG - - - - - - - - - - - 1,500,000.00 - - 1,500,000.00 ON GRID - SITIO ELECTRIFICATION PROGRAM (SEP) 1,500,000.00 1,500,000.00 1559 NORTHERN KABUNTALAN - - - - - - - - - 1,000,000.00 - - - - 1,000,000.00 LIVELIHOOD PROGRAMS 1,000,000.00 1,000,000.00 1560 PAGALUNGAN - - - - - - 2,070,000.00 - - - - - - - 2,070,000.00 HEALTH EMERGENCY MANAGEMENT 2,070,000.00 2,070,000.00 1561 PAGLAT - - - - - - 3,000,000.00 - - 4,000,000.00 - - - - 7,000,000.00 PROVISION OF BARANGAY HEALTH FACILITIES 3,000,000.00 3,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM - WOMEN'S HANDICRAFT 4,000,000.00 4,000,000.00 1562 PANDAG - - - 1,157,000.00 - - 1,500,000.00 - - 4,043,000.00 - 3,000,000.00 - - 9,700,000.00 PROVISION OF SCHOOL FURNITURE 1,157,000.00 1,157,000.00 ENHANCEMENT TRAINING OF HEALTH WORKERS 1,500,000.00 1,500,000.00 SUSTAINABLE LIVELIHOOD FOR COCO INDUSTRY 4,043,000.00 4,043,000.00 BRGY LINE ENHANCEMENT PROGRAM 3,000,000.00 3,000,000.00 1563 RAJAH BUAYAN - - 3,000,000.00 2,000,000.00 - - - - - - - - - - 5,000,000.00 NATIONAL GREENING PROGRAM 3,000,000.00 3,000,000.00 INNOVATIVE PROGRAMS TO PROMOTE ACCESS TO EDUCATION/ABOT-ALAM PROGRAM 2,000,000.00 2,000,000.00 1564 SHARIFF AGUAK (MAGANOY) (CAPITAL) - - - - - - - - - 3,000,000.00 - - - - 3,000,000.00 PROTECTIVE SERVICES - CONSTRUCTION OF EVACUATION CENTER 3,000,000.00 3,000,000.00 1565 SHARIFF SAYDONA MUSTAPHA - - - 2,500,000.00 - - - - - 2,000,000.00 - - - - 4,500,000.00 REHABILITATION OF SCHOOL BUILDING 2,500,000.00 2,500,000.00 LIVELIHOOD PROJECTS - DUCK RAISING 2,000,000.00 2,000,000.00 1566 SULTAN KUDARAT (NULING) - - - 1,830,000.00 - - - - - 2,000,000.00 - 6,000,000.00 - - 9,830,000.00 PROVISION OF BASIC EDUCATION FACILITIES 1,830,000.00 1,830,000.00 IMPLEMENTATION OF SUSTAINABLE LIVELIHOOD PROGRAM (SLP) 2,000,000.00 2,000,000.00 BRGY LINE ENHANCEMENT PROGRAM 6,000,000.00 6,000,000.00 1567 SULTAN SA BARONGIS (LAMBAYON) - - - 2,000,000.00 - - 1,200,000.00 - - - - - - - 3,200,000.00 REPAIR/REHABILITATION OF CLASSROOM WITH SCHOOL FACILITIES 2,000,000.00 2,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS CONSTRUCTION OF 1 UNIT BARANGAY HEALTH STATION WITH FACILITIES 1,200,000.00 1,200,000.00 1568 TALAYAN - - - 1,000,000.00 - - - - - - - - - - 1,000,000.00 REPAIR AND REHABILITATION OF PUBLIC SCHOOL BUILDINGS 1,000,000.00 1,000,000.00 1569 UPI - - - - - - - - - 1,500,000.00 - - - - 1,500,000.00 PROTECTIVE SERVICES - CONSTRUCTION OF MUNICIPAL CRISIS CENTER 1,500,000.00 1,500,000.00 SULU - - - 14,000,000.00 - 12,000,000.00 5,580,700.00 - - 45,725,000.00 - - - 2,000,000.00 79,305,700.00 1570 HADJI PANGLIMA TAHIL - - - 1,500,000.00 - 1,500,000.00 - - - - - - - - 3,000,000.00 REHABILITATION OF SCHOOL BUILDING 1,500,000.00 1,500,000.00 BRGY. ELECTRIFICATION PROGRAM 1,500,000.00 1,500,000.00 1571 JOLO (CAPITAL) - - - - - - - - - 19,000,000.00 - - - - 19,000,000.00 CONSTRUCTION OF JOLO COLD STORAGE - CONSTRUCTION OF MUNICIPAL EVACUATIONCENTER 19,000,000.00 19,000,000.00 1572 LUGUS - - - - - 3,000,000.00 - - - - - - - - 3,000,000.00 ELECTRIFICATION 3,000,000.00 3,000,000.00 1573 OLD PANAMAO - - - 1,000,000.00 - 1,500,000.00 - - - 3,500,000.00 - - - - 6,000,000.00 REPAIR / REHABILITATION OF CLASSROOMS 1,000,000.00 1,000,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM 1,500,000.00 1,500,000.00 CONSTRUCTION OF DAY CARE CENTER 3,500,000.00 3,500,000.00 1574 OMAR - - - - - - 1,298,500.00 - - - - - - - 1,298,500.00 CONSTRUCTION 50 SQM. BARANGAY HEALTH STATION WITH BASIC EQUIPMENT &INSTRUMENTS(OPB) 1,298,500.00 1,298,500.00 1575 PANDAMI - - - 3,600,000.00 - - - - - - - - - - 3,600,000.00 REPAIR / REHABILITATION OF 6 UNITS 12-CL OF SCHOOL BUILDING 3,600,000.00 3,600,000.00 1576 PANGLIMA ESTINO (NEWPANAMA) - - - - - - 2,000,000.00 - - - - - - - 2,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM AND OTHER PROGRAM 2,000,000.00 2,000,000.00 1577 PARANG - - - 4,000,000.00 - - 1,000,000.00 - - - - - - - 5,000,000.00 PROVISION OF EDUCATIONAL FACILITIES AND ACQUISITION OF SCHOOL FURNITURE 4,000,000.00 4,000,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 1578 PATA - - - - - 2,000,000.00 - - - - - - - - 2,000,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM (SOLAR PHOTOVOLTAIC SOLAR HOME SYSTEM) 2,000,000.00 2,000,000.00 1579 PATIKUL - - - 3,900,000.00 - - - - - 6,500,000.00 - - - - 10,400,000.00 RENOVATION OF SCHOOL BUILDINGS 3,000,000.00 3,000,000.00 PROVISION OF SCHOOL FURNITURES 600,000.00 600,000.00 GULAYAN SA PAARALAN 300,000.00 300,000.00 SKILLS AND TRAINING CENTER WITH MATERIALS 1,500,000.00 1,500,000.00 EVACUATION CENTER WITH FACILITIES 5,000,000.00 5,000,000.00 1580 TALIPAO - - - - - - 1,282,200.00 - - 16,725,000.00 - - - 2,000,000.00 20,007,200.00 COMMUNITY HEALTH TEAM (CHT) MOBILIZATION 274,200.00 274,200.00 RURAL HEALTH MID-WIFE PLACEMENT PROGRAM 1,008,000.00 1,008,000.00 SUSTAINING LIVELIHOOD PROGRAM 2,500,000.00 2,500,000.00 CONSTRUCTION OF DAY CARE CENTERS WITH FACILITIES 6,600,000.00 6,600,000.00 COMMUNITY DEMAND-DRIVEN DEVELOPMENT THROUGH COMMUNITY DEVELOPMENT ASSISTANT 7,625,000.00 7,625,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 2,000,000.00 2,000,000.00 1581 TAPUL - - - - - 4,000,000.00 - - - - - - - - 4,000,000.00 HOUSEHOLD ELECTRIFICATION PROGRAM(HEP) 4,000,000.00 4,000,000.00 TAWI-TAWI - - 5,000,000.00 20,500,000.00 - 1,750,000.00 8,400,000.00 - - 2,000,000.00 - - - 1,000,000.00 38,650,000.00 1582 BONGAO (CAPITAL) - - - 1,000,000.00 - 750,000.00 - - - - - - - 1,000,000.00 2,750,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION 500,000.00 500,000.00 INNOVATIVE PROGRAM TO PROMOTE ACCESS TO EDUCATION 500,000.00 500,000.00 HOUSEHOLD SOLAR ELECTRIFICATION PROGRAM 250,000.00 250,000.00 HOUSEHOLD SOLAR ELECTRIFICATION PROGRAM 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 500,000.00 1583 LANGUYAN - - - 3,000,000.00 - - 4,000,000.00 - - - - - - - 7,000,000.00 REHABILITATION OF CLASSROOMS 3,000,000.00 3,000,000.00 PHOTOVOLTAIC SOLAR HOME SYSTEM - COMPREHENSIVE COMMUNITY-BASED TB CONTROL PROGRAM 500,000.00 500,000.00 HIRING OF MIDWIVES 1,200,000.00 1,200,000.00 INSTALLATION OF 6 SOLAR POWERED-VACCINE STORAGE REFREGARATOR 600,000.00 600,000.00 REACHING EVERY BARANGAY 600,000.00 600,000.00 REHABILITATION OF BHS BARANGAY HEALTH STATION OF JAKARTA 500,000.00 500,000.00 TRAINING OF RHU STAFFS FOR COMMUNITY BASIC EMERGENCY OBSTETRIC AND NEWBORN CARE(BEMONC) 600,000.00 600,000.00 1584 MAPUN - - 1,000,000.00 3,000,000.00 - - 2,000,000.00 - - - - - - - 6,000,000.00 NATIONAL GREENING PROGRAM 1,000,000.00 1,000,000.00 REHAB OF SCHOOL BUILDING & FACILITIES 3,000,000.00 3,000,000.00 REHAB OF BARANGAY HEALTH CENTERS & UPGRADING OF HEALTH EQUIPMENTS 2,000,000.00 2,000,000.00 1585 PANGLIMA SUGALA (BALIMBING) - - 2,000,000.00 - - - - - - 2,000,000.00 - - - - 4,000,000.00 NATIONAL GREENING PROGRAM 2,000,000.00 2,000,000.00 SUSTAINABLE LIVELIHOOD PROGRAM 2,000,000.00 2,000,000.00 1586 SIBUTU - - - 1,000,000.00 - - 1,400,000.00 - - - - - - - 2,400,000.00 ABOT-ALAM 1,000,000.00 1,000,000.00 MOBILIZATION OF CHAT 1,400,000.00 1,400,000.00 1587 SIMUNUL - - - 2,500,000.00 - - 1,000,000.00 - - - - - - - 3,500,000.00 BASIC EDUCATION FACILITIES: REPAIR/REHABILITATION OF CLASSROOMS & PROVISION OF SCHOOL FURNITURE 2,500,000.00 2,500,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,000,000.00 1,000,000.00 1588 SOUTH UBIAN - - - 3,000,000.00 - 1,000,000.00 - - - - - - - - 4,000,000.00 REHABILITATION OF SCHOOL BUILDING AND PROVISION OF PLASTIC CHAIRS 3,000,000.00 3,000,000.00 HOUSEHOLD ELECTRIFICATION 1,000,000.00 1,000,000.00 1589 TANDUBAS - - - 5,000,000.00 - - - - - - - - - - 5,000,000.00 Table A LGU's List Priority Poverty Reduction Projects FY 2015 Grassroots Participatory Budgeting (In Pesos) DA NIA DENR DEPED DILG DOE DOH DOLE DOT DSWD DTI NEA TESDA LGSF TOTAL LGUs AND NAME OF PROJECTS REPAIR/REHAB OF CLASSROOMS 4,000,000.00 4,000,000.00 ABOT-ALAM PROGRAM 1,000,000.00 1,000,000.00 1590 TURTLE ISLANDS - - 2,000,000.00 2,000,000.00 - - - - - - - - - - 4,000,000.00 NATIONAL GREENING PROGRAM: REHABILITATION/REFORESTATION OF MANGROVES AT LIKUD BAKKAO 2,000,000.00 2,000,000.00 BASIC EDUCATION FACILITIES: REHABILITATION/REPAIR OF 2 UNITS SCHOOL BUILDING WITH 3 CLASSROOM EACH WITH COMPLETE FACILITIES 2,000,000.00 2,000,000.00 1590 T O T A L 4,282,468,270.80 178,701,170.55 323,508,495.90 1,493,509,100.45 5,752,833,715.28 84,679,500.00 1,472,862,977.79 444,277,841.65 348,041,329.81 2,717,446,237.27 614,125,834.63 101,716,887.78 296,367,147.76 2,789,061,572.37 20,899,600,082.04