You are on page 1of 1

Bts consumption:

12A*24hr=

Solar o/p required:

288A/5hr=

288A/day
57.6 A/hr

Avg current o/p per panel

120watt*.5(efficiency)/48v

Total panel required

57.6 /1.25A

48.08 i.e 60panels

Therefore 2 banks of 30 panels each required for the seamless service.


Battery bank required: 800AH 1 bank at most and 600AH at least
No of tristar required: 3 (2 for charging and 1 for load).

Maximum Load handling capacity of tristar is 60 ampere.


So not more than 25 panels can be connected to a single tristar.

Solar panel properties : 12V per panel,

1.25A

You might also like