Professional Documents
Culture Documents
103012
December 16,2009
Scooe of ltVork
Septaoe Blodloester
Work for this contract comprises the construction of a facility for anerobic treatment ol septage,
corn stover, biosolids and other organic waste material to produce biogas electrical power and
treated biosolids. The contract work includes a design/build component, for the biodigester and
biogas electrical generator.
1.
2.
3.
One
5.
6.
one (1) drum separator for dewatering septage, including polymer injection system,
one
4.
Control and Dewatering Building (9.2 m x 8.3 m), two story, which will contan the
drum separator, pasteurizer, otfice, odour control room and washroom.
8.
9.
10.
All miscellaneous equipment, hot water piping, site piping, pumps, process piping
and site grading.
11.
12.
13.
Prepared by,
GENIVAR Consultants LP
MRS/lem