COSTOS
JULIO/2011
PROYECTO:
EJEMPLO
PARTIDA No.: 11
UNIDAD: M3
MAMPOSTERA
PARA MURO
A- MATERIALES
SUB
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO
TOTAL
piedra
m3
1,25
$15,00
$18,75
cemento
bol
2,75
$7,89
$21,70
arena
m3
0,30
$25,00
$7,50
sg
1,00
$5,00
$5,00
SUB - TOTAL:
$52,95
B-MANO DE OBRA
SUB
DESCRIPCION
JORNAL
PRESTACION
JORN-TOTAL
RENDIMIENTO
auxiliar
8,00
4,00
12,00
0,75
$16,00
albail
15,00
7,50
22,50
0,75
$30,00
SUB - TOTAL:
TOTAL
$46,00
C-EQUIPO Y HERRAMIENTAS
SUB
DESCRIPCION
concretera
bolsa
TIPO
CAPACIDAD
RENDIMIENTO
COSTO/HORA
1,20
$2,88
TOTAL
SUB - TOTAL:
http://intercambioinftecnica.blogspot.com/2011/08/costos-unitarios-mamposteria.html
$2,40
$2,40
1/2
15/6/2014
D-SUBCONTRATOS
SUB
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO
TOTAL
$0,00
SUB - TOTAL:
$0,00
COSTO
DIRECTO = A
+ B + C +
D11
$101,35
COSTO INDIRECTO (
35
% C. D.)
PRECIO UNITARIO
$35,47
$136,82
Aadir un comentario
Introduce tu comentario...
Comentar como:
Publicar
Cuenta de Google
Vista previa
http://intercambioinftecnica.blogspot.com/2011/08/costos-unitarios-mamposteria.html
2/2