Main sheet
cal
This sheet takes input from Main sheet, calculates and transfer back output to Main s
Calculates
Various losses
Total makeup water quantity
Side stream filter capacity
Dimension of CT Basin
DBS
INPUT
PROCESS DATA
Circulation Flow
Suply Temperature
Return Temperature
Wet Bulb Temperature
Approach
Range
Cycles of Conc.
500
33
43
27.8
5.2
10
4
M3/hr
C
C
C
C
C
OUTPUT
1
2
3
4
Evaporation Loss
Blow Down Loss
Drift Loss
Back Wash Loss
8
3
1
10
M3/hr
M3/hr
M3/hr
M3/hr
5 Total Make up
22 M3/hr
15 M3/hr
INPUT
DATA FROM CT VENDOR
CT footprint
Length
Width
8 mt
4 mt
600
200
1312.5
300
300
mm
mm
mm
mm
mm
OUTPUT
ELEVATION
300 mm
MaxL
300 mm
NL
1313 mm
MinL
200 mm
Pump CL
600 mm
Sump
2713 mm
Total Depth
Circulation Flow
500
By process requirement
By process requirement
As per prevailing atm condition
Suply Temperature
Return Temperature
Wet Bulb Temperature
Approach
Range
COC
33
43
27.8
5.2
10
4
As per CW treatment
CT Makeup Reuirement
1 Evaporation Loss
Q
Range
Evaporation loss
500
10
7.65
8
Round Off
2 Blow Down Loss
Eavporation loss
COC
Blow Down Loss
8
4
2.7
3
Round Off
3 Drift Loss
Q
Drift Loss
500
1
1
Round Off
4 Side Stream Filter
Side Stream Filter capacity
3% of Circulation rate
Q
Side Stream Capacity
500
15
15
Round Off
Back Wash Loss
2% of Circulation rate
Q
Side Stream Capacity
Round Off
500
10
10
CW MAKE UP FLOW = Evap loss + B/D loss + Drift Loss + Back wash
CW Make up
22
CT BASIN
M3/hr
C
C
C
C
C
CT Capacity
Q
M3/hr
C
M3/hr
M3/hr
CT Foot print
L
B
Area
Ht of water storage
(min to normal)
500 M3/hr
41.7 M3/hr
42 M3/hr
8 mt
4 mt
32 m2
1.3125 mt
600 mm
200 mm
M3/hr
M3/hr
M3/hr
M3/hr
M3/hr
M3/hr
M3/hr
1312.5 mm
300
300