The file has three sheets

Info

Information of how to use the file

Main sheet

Data entry and output sheet - yellow fields input fields

cal

This sheet takes input from Main sheet, calculates and transfer back output to Main s

Calculates
Various losses
Total makeup water quantity
Side stream filter capacity
Dimension of CT Basin

DBS

et, calculates and transfer back output to Main sheet

INPUT
PROCESS DATA
Circulation Flow
Suply Temperature
Return Temperature
Wet Bulb Temperature
Approach
Range
Cycles of Conc.

500
33
43
27.8
5.2
10
4

M3/hr
C
C
C
C
C

OUTPUT
1
2
3
4

Evaporation Loss
Blow Down Loss
Drift Loss
Back Wash Loss

8
3
1
10

M3/hr
M3/hr
M3/hr
M3/hr

5 Total Make up

22 M3/hr

6 Side Stream Capacity

15 M3/hr

INPUT
DATA FROM CT VENDOR
CT footprint
Length
Width

8 mt
4 mt

Sump level to pump centre level


Pump centre level to min level
MinL to NL
Normal level to max level (over flow level)
Free board level to max level

600
200
1312.5
300
300

mm
mm
mm
mm
mm

OUTPUT
ELEVATION
300 mm

MaxL

300 mm

NL

1313 mm

MinL

200 mm

Pump CL

600 mm

Sump

2713 mm

Total Depth

To avoid sediments ingress in pump

ments ingress in pump

COOLING TOWER & ITS SYSTEM


By process requirement

Circulation Flow

500

By process requirement
By process requirement
As per prevailing atm condition

Suply Temperature
Return Temperature
Wet Bulb Temperature
Approach
Range
COC

33
43
27.8
5.2
10
4

As per CW treatment

CT Makeup Reuirement
1 Evaporation Loss

0.00153 * Range * Circulation

Q
Range
Evaporation loss

500
10
7.65
8

Round Off
2 Blow Down Loss

Evap Loss / [ COC - 1]

Eavporation loss
COC
Blow Down Loss

8
4
2.7
3

Round Off
3 Drift Loss

0.2% of Circulation rate

Q
Drift Loss

500
1
1

Round Off
4 Side Stream Filter
Side Stream Filter capacity

3% of Circulation rate

Q
Side Stream Capacity

500
15
15

Round Off
Back Wash Loss

2% of Circulation rate

Q
Side Stream Capacity
Round Off

500
10
10

CW MAKE UP FLOW = Evap loss + B/D loss + Drift Loss + Back wash
CW Make up

22

CT BASIN
M3/hr
C
C
C
C
C

CT Capacity
Q

110% of circulating flow


500 M3/hr
110%
550 M3/hr

Hold up volume above min level in CT Basin


5 minutes of circulating water
Q
5 min of vol
Round Off
42 M3 of volume to be of min level to normal level

M3/hr
C
M3/hr
M3/hr

CT Foot print
L
B
Area
Ht of water storage
(min to normal)

500 M3/hr
41.7 M3/hr
42 M3/hr

8 mt
4 mt
32 m2
1.3125 mt

WATER LEVEL IN SUMP


M3/hr
M3/hr
M3/hr

Sump to pump centre line

600 mm

Pump centre level to min level

200 mm

Min Level to Nor level


M3/hr
M3/hr
M3/hr

M3/hr
M3/hr
M3/hr

M3/hr
M3/hr
M3/hr

M3/hr

1312.5 mm

Normal level to max level (over flow level)

300

Free board level to max level

300