Item
01
01.01
01.02
01.03
02
02.01
02.02
03
03.01
04
04.01
04.02
04.03
04.04
05
05.01
05.02
06
06.01
06.02
06.03
07
07.01
07.02
07.03
08
08.01
08.02
08.03
08.04
08.05
09
09.01
09.02
09.03
10
10.01
10.02
10.03
10.04
11
11.01
11.02
12
12.01

Descripcin
TRABAJOS PRELIMINARES
CASETA Y ALMACEN
CARTEL DE OBRA
CERCO PROVISIONAL
TRABAJOS PRELIMINARES
TRAZO NIVELES Y REPLANTEO
MOVILIZACION Y DESMOVILIZACIN DE EQUIPOS
SEGURIDA Y SALUD
SEALIZACION TEMPORAL DE SEGURIDAD
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO RENDIMIENTO=460 M3/DIA
CORTE ROCA SUELTA (PERF. Y DISP.)
TRANSPORTE P/ELIMINACION DE MATERIAL EXCEDENTE D<=1 KM
PERFILADO Y COMPACTADO EN SUBRAZANTE
SUB BASE GRANULAR
CONTROL TOPOGRAFICO DURANTE LA EJECUCION
BASE GRANULAR E=0.30 M REND.=1760 M2/DIA FACT. COMPACT.=1.20
PAVIMENTO EN VIA
ENCOFRADO Y DESENCOFRADO
EMBOQUILLADO DE PIEDRA CON CONCRETO F'c=175 KG/CM2
CURADO DE CONCRETO
JUNTAS DE DILTACION
JUNTAS ASFALTICAS DE CONTRACCION 1"x4"
JUNTAS ASFALTICAS DE DILATACION 1"x8"
JUNTAS ASFALTICAS DE AISLAMIENTO
VEREDAS
ENCOFRADO Y DESENCOFRADO - VEREDA
BASE DE PIEDRA MEDIANA (PM=4")
CONCRETO F'C=140 KG/CM2 P/VEREDA
ACABADO Y BRUADO .
JUNTA DE DILATACION C/ASFALTO
MURO DE ESCOLLERA
EXCAVACION CON MAQUINARIA
CONCRETO F'C=100 KG/CM2 P/SOLADO
MURO DE ESCOLLERA
ENCAUZAMIENTO DE CANAL DE RIEGO
EXCAVACION CON MAQUINARIA
PERFILADO Y COMPACTADO EN CANAL
CAMA DE APOYO PARA TUBERIA
TUBERIA ISO 4435/UF S25 D=315 MM
PRUEBAS Y ENSAYOS
PRUEBA DE COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO)
DISEO DE MEZCLA
FLETE
FLETE TERRESTRE

Und. Metrado

Precio (S/.)

GLB
GLB
GLB

1.00
1.00
1.00

1,500.00
500.00
1,000.00

m2
GLB

3,035.60
1.00

0.66
2,500.00

GLB

1.00

250.00

m3
m3
M3K
m2

1,940.05
485.01
2,880.51
3,035.60

1.40
12.83
1.80
1.22

m2
m2

3,035.60
2,420.00

0.46
16.87

m2
m2
m2

414.50
2,420.00
2,420.00

24.94
32.75
0.35

m
m
m

779.50
257.00
1,036.00

5.16
7.86
5.76

m2
m2
m3
m2
m

121.05
615.60
87.62
615.60
477.70

21.77
11.66
149.71
4.58
3.71

m3
m3
m3

48.00
4.00
72.00

1.40
124.86
39.28

m3
m2
m
m

151.20
126.00
140.00
140.00

1.40
2.69
6.05
97.07

und
und

2.00
1.00

250.00
250.00

GLB

1.00

2,474.93

Parcial (S/.)
3,000.00
1,500.00
500.00
1,000.00
4,503.50
2,003.50
2,500.00
250.00
250.00
17,827.10
2,716.07
6,222.68
5,184.92
3,703.43
42,221.78
1,396.38
40,825.40
90,439.63
10,337.63
79,255.00
847.00
12,009.60
4,022.22
2,020.02
5,967.36
27,522.47
2,635.26
7,177.90
13,117.59
2,819.45
1,772.27
3,394.80
67.20
499.44
2,828.16
14,987.42
211.68
338.94
847.00
13,589.80
750.00
500.00
250.00
2,474.93
2,474.93