RESUMEN DE VALORIZACION MENSUAL

VALORIZACION MENSUAL N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA

ENTIDAD

: MUNICIPALIDAD DISTRITAL DE TIABAYA

MODALIDAD

: OBRA POR CONTRATA - SUMA ALZADA

CONTRATISTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

ING. RESIDENTE

: ING CIRO SANCHEZ TEJADA

ING INSPECTOR

: ING JOSE PAREDES AGUILAR

FECHA

: MARZO DEL 2011

MONTO
DESCRIPCION

VALORIZACION

CONTRATADO
(sin IGV)

ANTERIOR

VALORIZACION CONTRACTUAL
FORMULA 01 (SUB PRESUPUESTO 01)

S/.

818,323.62 S/.

195,189.17 S/.

139,769.82

FORMULA 02 (SUB PRESUPUESTO 02)

S/.

159,774.60 S/.

12,777.15 S/.

65,110.66

SUB TOTAL (FORMULA 01 + FORMULA 02)

S/.

978,098.22 S/.

207,966.32 S/.

204,880.48

FACTOR DE RELACION: 1.000

S/.

978,098.22 S/.

207,966.32 S/.

204,880.48

TOTAL (A)

S/.

978,098.22 S/.

207,966.32 S/.

204,880.48

AVANCE FISICO DE OBRA


AVANCE PROGRAMADO DE OBRA

20.95%

9.93%

33.52%

1.007

MONTO REAJUSTE F-01

1.020

1,366.32 S/.

FORMULA 02 (SUB PRESUPUESTO 02)

1.047

MONTO REAJUSTE F-02


TOTAL (B)
VALORIZACION BRUTA (VB=A+B)

2,795.40
1.065

600.53 S/.

4,247.23

1,966.85 S/.

7,042.63

209,933.17 S/.

211,923.12

36,072.95 S/.

36,414.88

AMORTIZACIONES
AMORTIZACION DEL ADELANTO DIRECTO (17.18% C.O.)

S/.

AMORTIZACION DEL ADELANTO DE MATERIALES

S/.

168,067.23
-

TOTAL ( C )
VALORIZACION NETA ( VN = VB - C )

21.26%

REAJUSTES
FORMULA 01 (SUB PRESUPUESTO 01)

ACTUAL

S/.

36,072.95 S/.

36,414.88

173,860.22 S/.

175,508.23

MONTO A PAGAR AL CONTRATISTA


EN EFECTIVO (VN)

S/.

168,067.23

173,860.22 S/.

175,508.23

EN I.G.V.

S/.

31,932.77

33,033.44 S/.

33,346.56

TOTAL ( E )

S/.

200,000.00

206,893.66 S/.

208,854.79

FACTOR DE GARANTIA (FG) = 50%(10%(1'163,936.88))

58,196.84

58,196.84

COMPROMISO A SOLICITAR

148,696.82 S/.

150,657.95

Se debe facturar, Sub total: S/. 175518.89; IGV (18%): S/. 31593.40; Total: S/. 207112.29

E VALORIZACION MENSUAL

IZACION MENSUAL N 02

MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

ACUMULADA

SALDO

AVANCE

POR

ACUMULADO

VALORIZAR

S/.

334,958.99

40.93% S/.

483,364.62

S/.

77,887.81

48.75% S/.

81,886.79

S/.

412,846.80

S/.

565,251.41

S/.

412,846.80

S/.

565,251.41

S/.

412,846.80

S/.

565,251.41

S/.

95,579.40

42.21%
43.45%

S/.
S/.
S/.

72,487.83
72,487.83

S/.
S/.

95,579.40

207,112.29

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

COMPLEJO DEPORTIVO PATASAGUA

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

COMPLEJO DEPORTIVO PATASAGUA


01 OBRAS PROVISIONALES
01.0 CARTEL DE OBRA 2.4X3.6M(BANNER)

und

1.00 S/.

587.68 S/.

587.68

1.00 S/.

587.68

0.00 S/.

01.0 ALMACEN OFICINA Y CASETA DE GUARDIANIA

glb

1.00 S/.

1,540.00 S/.

1,540.00

1.00 S/.

1,540.00

0.00 S/.

m2

6,630.90 S/.

0.92 S/.

6,100.43

6,630.90 S/.

6,100.43

0.00 S/.

03.0 NIVELACION Y COMPACTACION

6,630.90 S/.

3.29 S/.

21,815.66

2,998.76 S/.

9,865.90

3,331.95 S/.

10,962.12

03.0 EXCAVACION DE ZANJAS PARA CIMIENTO

m3

1,613.83 S/.

25.77 S/.

41,588.40

1,335.25 S/.

34,409.48

278.58 S/.

7,178.92

03.0 RELLENO COMPACTADO CON MATERIAL PROPIO

m3

400.38 S/.

9.10 S/.

3,643.46

259.01 S/.

2,356.98

141.37 S/.

1,286.48

03.0 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO AFIRMADO

m3

587.20 S/.

47.32 S/.

27,786.30

467.20 S/.

22,108.00

72.00 S/.

3,407.04

03.0 ACARREO INTERNO MAT. PROCEDENTE DE EXC.

m3

1,213.45 S/.

17.19 S/.

20,859.21

1,076.24 S/.

18,500.64

137.21 S/.

2,358.56

04.0 CIMIENTOS CORRIDOS +30% PIEDRA

m3

269.63 S/.

148.81 S/.

40,123.64

76.48 S/.

11,381.33

115.10 S/.

17,127.58

04.0 CONCRETO CICLOPEO fc=140 kg/cm2 + 70%PM PARA MUROS

m3

362.41 S/.

169.06 S/.

61,269.03

118.40 S/.

20,017.52

110.24 S/.

18,637.49

04.0 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS DE CONTENCION

m2

1,281.97 S/.

35.94 S/.

46,074.00

351.92 S/.

12,647.83

548.43 S/.

19,710.57

04.0 BANCAS, CONCRETO FC=140kg/cm2

m3

11.54 S/.

296.77 S/.

3,424.73

0.00 S/.

04.0 BANCAS, ENCOFRADO Y DESENCOFRADO

m2

32.40 S/.

21.80 S/.

706.32

0.00 S/.

0.00 S/.

04.0 GRADAS CONCRETO 1:10 +30%PG

m3

152.06 S/.

156.97 S/.

23,868.86

0.00 S/.

10.56 S/.

04.0 GRADERIAS, CONCRETO FC=140kg/cm2

m3

135.00 S/.

222.58 S/.

30,048.30

0.00 S/.

0.00 S/.

02 TRABAJOS PRELIMINARES
02.0 TRAZO Y REPLANTEO PRELIMINAR
03 MOVIMIENTO DE TIERRAS

04 CONCRETO SIMPLE

0.00 S/.

1,657.13
-

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

COMPLEJO DEPORTIVO PATASAGUA

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

04.0 ENCOFRADO Y DESENCOFRADO EN GRADERIAS

m2

433.70 S/.

20.78 S/.

9,012.29

0.00 S/.

29.70 S/.

617.17

04.0 FALSO PISO DE 4" MEZCLA 1:8 CEMENTO HORMIGON

m2

960.47 S/.

22.36 S/.

21,476.11

0.00 S/.

0.00 S/.

05.0 CONCRETO f'c=210Kg/cm2, EN ZAPATAS

m3

82.14 S/.

262.05 S/.

21,524.79

34.72 S/.

9,099.42

1.64 S/.

429.76

05.0 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS

kg

3,191.78 S/.

3.90 S/.

12,447.94

1,653.07 S/.

6,446.97

1,080.80 S/.

4,215.12

05.0 MUROS DE CONCRETO fc=210kg/cm2

m3

68.24 S/.

351.35 S/.

23,976.12

0.00 S/.

21.99 S/.

7,724.54

05.0 MUROS ACERO FY=4200kg/cm2

kg

4,746.47 S/.

4.01 S/.

19,033.34

2,142.98 S/.

8,593.33

1,303.00 S/.

5,225.01

05.0 MUROS ENCOFRADO Y DESENCOFRADO

m3

422.98 S/.

35.94 S/.

15,201.90

131.09 S/.

4,711.45

152.69 S/.

5,487.71

05.0 CONCRETO COLUMNAS f'c=210 kg/cm2

m3

20.20 S/.

359.33 S/.

7,258.47

3.15 S/.

1,131.89

4.81 S/.

1,729.28

05.0 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

m2

275.75 S/.

35.84 S/.

9,882.88

57.75 S/.

2,069.76

57.75 S/.

2,069.76

05.0 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

kg

506.55 S/.

3.99 S/.

2,021.13

101.31 S/.

404.23

205.26 S/.

818.99

05.0 CONCRETO VIGAS f'c=210 kg/cm2

m3

16.57 S/.

282.18 S/.

4,675.72

0.00 S/.

1.51 S/.

426.66

05.1 ACERO EN VIGAS

kg

1,497.05 S/.

3.99 S/.

5,973.23

0.00 S/.

449.12 S/.

1,791.99

05.1 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

123.67 S/.

45.21 S/.

5,591.12

0.00 S/.

20.88 S/.

943.98

05.1 GRADERIAS ACEROS FY=4200kg/cm2

kg

1,715.65 S/.

3.99 S/.

6,845.44

0.00 S/.

0.00 S/.

05.1 ENCOFRADO Y DESENCOFRADO EN GRADERIAS

m2

35.05 S/.

20.78 S/.

728.34

0.00 S/.

0.00 S/.

05.1 GRADERIAS DE CONCRETO FC=210kg/cm2

m2

8.05 S/.

273.27 S/.

2,199.82

0.00 S/.

0.00 S/.

m2

2,075.90 S/.

16.44 S/.

34,127.80

0.00 S/.

553.96 S/.

05 CONCRETO ARMADO

06 REVOQUES ENLUCIDOS Y MOLDURAS


06.0 TARRAJEOS VARIOS
07 PISOS Y PAVIMENTOS

9,107.09

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

COMPLEJO DEPORTIVO PATASAGUA

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

07.0 CONTRAPISO DE 48mm

m2

142.00 S/.

18.37 S/.

07.0 PISO CERAMICO 30 X 30

m2

142.00 S/.

07.0 VEREDA DE CONCRETO fc=140kg/cm SEGUN DISEO

m2

525.47 S/.

07.0 ENCIMADO LOSA DEPORTIVA

m2

07.0 PISO PIEDRA LAJA


07.0 PISO DE CANTOS RODADOS

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

2,608.54

0.00 S/.

0.00 S/.

35.93 S/.

5,102.06

0.00 S/.

0.00 S/.

37.18 S/.

19,536.97

0.00 S/.

0.00 S/.

426.67 S/.

19.33 S/.

8,247.53

0.00 S/.

0.00 S/.

m2

348.00 S/.

46.90 S/.

16,321.20

0.00 S/.

0.00 S/.

m2

87.36 S/.

51.55 S/.

4,503.41

0.00 S/.

0.00 S/.

und

8.00 S/.

155.00 S/.

1,240.00

0.00 S/.

0.00 S/.

08 CARPINTERIA DE MADERA
08.0 BANCAS ORNAMENTALES
09 COBERTURAS CON MALLA RACHELL
09.0 CONCRETO PEDESTALES COLUMNA

m3

0.11 S/.

273.13 S/.

30.04

0.00 S/.

0.00 S/.

09.0 COLUMNA ARMADA PARA MALLA

28.00 S/.

109.89 S/.

3,076.92

0.00 S/.

0.00 S/.

09.0 VIGA ARMADA PARA MALLA

56.00 S/.

78.41 S/.

4,390.96

0.00 S/.

0.00 S/.

09.0 TEMPLADORES Y REGULADORES DE ACERO

pza

20.00 S/.

36.10 S/.

722.00

0.00 S/.

0.00 S/.

09.0 MALLA RACHELL

m2

488.00 S/.

14.73 S/.

7,188.24

0.00 S/.

0.00 S/.

und

20.00 S/.

292.01 S/.

5,840.20

0.00 S/.

0.00 S/.

10.0 VIGA DE TUBO 4X3"

58.00 S/.

32.83 S/.

1,904.14

0.00 S/.

0.00 S/.

10.0 COBERTURA LIGERA

m2

325.00 S/.

24.33 S/.

7,907.25

0.00 S/.

0.00 S/.

104.00 S/.

130.00 S/.

13,520.00

0.00 S/.

0.00 S/.

10 COBERTURA EN GRADERIAS
10.0 COLUMNA DE FIERRO CUADRADA

11 CARPINTERIA METALICA
11.0 CERCO DE MALLA 2X2 N8 TUB. fn 3"Y 2" H=2.00m

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

COMPLEJO DEPORTIVO PATASAGUA

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

11.0 EXCAVACION DE CIMIENTOS DE POSTES DE JUEGOS RECREATIVOS.

m3

0.96 S/.

25.77 S/.

11.0 CIMIENTO PARA JUEGOS RECREATIVOS FC=140kg/cm2

m3

0.96 S/.

11.0 TABLERO DE BASKET

jgo

2.00 S/.

11.0 JUEGO DE RED Y ACCESORIOS PARA CANCHA DE VOLEY

jgo

11.0 JUEGO DE RED Y ACCESORIOS PARA ARCOS DE FUTBOL

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

24.74

0.00 S/.

0.00 S/.

167.73 S/.

161.02

0.00 S/.

0.00 S/.

540.80 S/.

1,081.60

0.00 S/.

0.00 S/.

2.00 S/.

89.28 S/.

178.56

0.00 S/.

0.00 S/.

jgo

2.00 S/.

299.86 S/.

599.72

0.00 S/.

0.00 S/.

12.0 PINTURA LATEX MUROS COLUMNAS Y SOBRECIMIENTOS

m2

2,315.65 S/.

5.49 S/.

12,712.92

0.00 S/.

0.00 S/.

12.0 PINTURA ESMALTE 2 MANOS EN GRADERIAS

m2

593.00 S/.

4.33 S/.

2,567.69

0.00 S/.

0.00 S/.

12.0 PINTURA DE DEMARCACION DEPORTIVA

und

1.00 S/.

87.79 S/.

87.79

0.00 S/.

0.00 S/.

12 PINTURAS

13 INSTALACIONES SANITARIAS
13.0 CONDUCCION Y DISTRIBUCION
13.0

EXCAVACION DE ZANJAS PARA TUBERIA

180.00 S/.

6.88 S/.

1,238.40

0.00 S/.

0.00 S/.

13.0

REFINE DE TERRENO EXCAVADO EN BUZONES EN TERRENO GRAVOSO

180.00 S/.

4.90 S/.

882.00

0.00 S/.

0.00 S/.

13.0

RELLENO Y APISONADO DE ZANJAS

180.00 S/.

3.92 S/.

705.60

0.00 S/.

0.00 S/.

13.0

RED DE DISTRIBUCION INTERIOR CON TUBERIA 1"

130.00 S/.

12.49 S/.

1,623.70

0.00 S/.

0.00 S/.

13.0

RED DE DISTRIBUCION INTERIOR CON TUBERIA 1"

50.00 S/.

11.50 S/.

575.00

0.00 S/.

0.00 S/.

13.0

CODO DE PVC 1 1/12"

und

12.00 S/.

22.29 S/.

267.48

0.00 S/.

0.00 S/.

13.0

TEE PVC-SAP 1/12"

und

8.00 S/.

18.57 S/.

148.56

0.00 S/.

0.00 S/.

13.0

VALVULA COMPUERTA DE 1"

und

4.00 S/.

147.88 S/.

591.52

0.00 S/.

0.00 S/.

13.0 RESERVORIO Y CAMARA ROMPEPRESIONES

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

COMPLEJO DEPORTIVO PATASAGUA

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

13.0

CONCRETO EN CISTERNA SUBETERRANEA Fc=210kg/cm2

m3

13.0

ENCOFRADO EN CISTERNA SUBETERRANEA Fc=210kg/cm2

13.0

ACERO DE REFUERZO fy=4,200 kg/cm2

13.0
13.0

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

2.30 S/.

362.37 S/.

833.45

0.00 S/.

0.00 S/.

m3

4.70 S/.

27.03 S/.

127.04

0.00 S/.

0.00 S/.

kg

180.00 S/.

3.81 S/.

685.80

0.00 S/.

0.00 S/.

REVESTIMIENTO DE CONCRETO R=37ML/DIA

5.30 S/.

19.32 S/.

102.40

0.00 S/.

0.00 S/.

SUMINISTRO Y COLOCACION DE ACCESORIOS

glb

2.00 S/.

150.00 S/.

300.00

0.00 S/.

0.00 S/.

14.0 EXCAVACION DE ZANJAS PARA TUBERIAS ELECTRICAS

341.00 S/.

10.31 S/.

3,515.71

0.00 S/.

0.00 S/.

14.0 ACOMETIDA TABLERO GENERAL

210.00 S/.

13.83 S/.

2,904.30

0.00 S/.

0.00 S/.

und

10.00 S/.

184.79 S/.

1,847.90

0.00 S/.

0.00 S/.

14 INSTALACIONES ELECTRICAS

14.0 BUZON PARA RED DE BAJA TENSION


14.0 CABLEADO

341.00 S/.

13.69 S/.

4,668.29

0.00 S/.

0.00 S/.

14.0 TABLERO DE DISTRIBUCION

und

1.00 S/.

285.01 S/.

285.01

0.00 S/.

0.00 S/.

14.0 POSTES PARA LUMINARIAS

und

15.00 S/.

137.41 S/.

2,061.15

0.00 S/.

0.00 S/.

14.0 LUMINARIA DE VAPOR DE SODIO DE 75 W

und

15.00 S/.

305.84 S/.

4,587.60

0.00 S/.

0.00 S/.

14.0 PRUEBAS ELECTRICAS PARA ALUMBRADO PUBLICO

glb

1.00 S/.

241.49 S/.

241.49

0.00 S/.

0.00 S/.

14.0 POZO A TIERRA

und

3.00 S/.

503.74 S/.

1,511.22

0.00 S/.

0.00 S/.

15.0 SEMBRADO DE GRASS

m2

4,018.00 S/.

7.88 S/.

31,661.84

0.00 S/.

0.00 S/.

15.0 PLANTIO DE ARBOLES

und

15.00 S/.

11.11 S/.

166.65

0.00 S/.

0.00 S/.

15.0 LIMPIEZA PERMANENTE EN OBRA

glb

1.00 S/.

550.00 S/.

550.00

0.00 S/.

0.25 S/.

15.0 JUEGOS INFANTILES

jgo

1.00 S/.

7,626.00 S/.

7,626.00

0.00 S/.

0.00 S/.

15 VARIOS, LIMPIEZA Y JARDINERIA

137.50
-

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

COMPLEJO DEPORTIVO PATASAGUA

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

15

JUNTA DE MURO CON TECKNOPOR e="

und

METRADO

P.UNITARIO

30.00 S/.

AVANCE ANTERIOR

P.PARCIAL

METRADO

VALOR S/.

10.53 S/.

315.90

0.00 S/.

S/.

720,989.97

S/.

COSTO DIRECTO

AVANCE ACTUAL
METRADO
-

VALOR S/.

9.00 S/.

94.77

171,972.84

S/.

123,145.22

GASTOS GENERALES

8.50%

S/.

61,284.15

S/.

14,617.69

S/.

10,467.34

UTILIDAD

5.00%

S/.

36,049.50

S/.

8,598.64

S/.

6,157.26

S/.

818,323.62

S/.

195,189.17

S/.

139,769.82

S/.

818,323.62

S/.

195,189.17

S/.

139,769.82

S/.

155,481.49

19.00% S/.

37,085.94

19.00% S/.

26,556.27

S/.

973,805.11

S/.

232,275.12

S/.

166,326.09

SUB TOTAL
FACTOR DE RELACION

1.0000

SUB TOTAL FACTOR DE RELACION

IGV
TOTAL

19%

N DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

VALOR S/.

0.00%

1.00 S/.

587.68

100.00%

0.00 S/.

0.00%

0.00%

1.00 S/.

1,540.00

100.00%

0.00 S/.

0.00%

0.00%

6,630.90 S/.

6,100.43

100.00%

0.00 S/.

0.00%

50.25%

6,330.71 S/.

20,828.02

95.47%

300.20 S/.

17.26%

1,613.83 S/.

41,588.40

100.00%

0.00 S/.

35.31%

400.38 S/.

3,643.46

100.00%

0.00 S/.

12.26%

539.20 S/.

25,515.04

91.83%

48.00 S/.

11.31%

1,213.45 S/.

20,859.20

100.00%

0.00 S/.

42.69%

191.58 S/.

28,508.91

71.05%

78.05 S/.

11,614.73

28.95%

30.42%

228.65 S/.

38,655.01

63.09%

133.76 S/.

22,614.02

36.91%

42.78%

900.35 S/.

32,358.40

70.23%

381.63 S/.

13,715.60

29.77%

0.00%

0.00 S/.

0.00%

11.54 S/.

3,424.73

100.00%

0.00%

32.40 S/.

706.32

100.00%

6.94%

141.50 S/.

22,211.73

93.06%

0.00%

135.00 S/.

30,048.30

100.00%

0.00%

0.00 S/.

6.94%

10.56 S/.

0.00%

0.00 S/.

1,657.13
-

987.64

4.53%

0.00%

0.00%

2,271.26
-

8.17%
0.00%

N DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO
6.85%

29.70 S/.

0.00%

0.00 S/.

2.00%

36.36 S/.

33.86%

2,733.87 S/.

VALOR S/.

SALDOS
%

617.17

METRADO

VALOR S/.

6.85%

404.00 S/.

8,395.12

93.15%

0.00%

960.47 S/.

21,476.11

100.00%

9,529.18

44.27%

45.78 S/.

11,995.61

55.73%

10,662.09

85.65%

457.91 S/.

1,785.85

14.35%

32.22%

21.99 S/.

7,724.54

32.22%

46.25 S/.

16,251.58

67.78%

27.45%

3,445.97 S/.

13,818.34

72.60%

1,300.50 S/.

5,215.00

27.40%

36.10%

283.78 S/.

10,199.16

67.09%

139.20 S/.

5,002.74

32.91%

23.82%

7.96 S/.

2,861.17

39.42%

12.24 S/.

4,397.30

60.58%

20.94%

115.50 S/.

4,139.52

41.89%

160.25 S/.

5,743.36

58.11%

40.52%

306.57 S/.

1,223.22

60.52%

199.98 S/.

797.91

39.48%

9.13%

1.51 S/.

426.66

9.13%

15.06 S/.

4,249.06

90.87%

30.00%

449.12 S/.

1,791.99

30.00%

1,047.93 S/.

4,181.24

70.00%

16.88%

20.88 S/.

943.98

16.88%

102.79 S/.

4,647.14

83.12%

0.00%

0.00 S/.

0.00%

1,715.65 S/.

6,845.44

100.00%

0.00%

0.00 S/.

0.00%

35.05 S/.

728.34

100.00%

0.00%

0.00 S/.

0.00%

8.05 S/.

2,199.82

100.00%

26.69%

553.96 S/.

26.69%

1,521.94 S/.

25,020.71

73.31%

9,107.09

N DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

0.00%

0.00 S/.

0.00%

142.00 S/.

0.00%

0.00 S/.

0.00%

0.00%

0.00 S/.

0.00%

0.00%

0.00 S/.

0.00%

0.00 S/.

0.00%

VALOR S/.

2,608.54

100.00%

142.00 S/.

5,102.06

100.00%

525.47 S/.

19,536.97

100.00%

0.00%

426.67 S/.

8,247.53

100.00%

0.00%

348.00 S/.

16,321.20

100.00%

0.00 S/.

0.00%

87.36 S/.

4,503.41

100.00%

0.00%

0.00 S/.

0.00%

8.00 S/.

1,240.00

100.00%

0.00%

0.00 S/.

0.00%

0.11 S/.

30.04

100.00%

0.00%

0.00 S/.

0.00%

28.00 S/.

3,076.92

100.00%

0.00%

0.00 S/.

0.00%

56.00 S/.

4,390.96

100.00%

0.00%

0.00 S/.

0.00%

20.00 S/.

722.00

100.00%

0.00%

0.00 S/.

0.00%

488.00 S/.

7,188.24

100.00%

0.00%

0.00 S/.

0.00%

20.00 S/.

5,840.20

100.00%

0.00%

0.00 S/.

0.00%

58.00 S/.

1,904.14

100.00%

0.00%

0.00 S/.

0.00%

325.00 S/.

7,907.25

100.00%

0.00%

0.00 S/.

0.00%

104.00 S/.

13,520.00

100.00%

N DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

0.00%

0.00 S/.

0.00%

0.96 S/.

0.00%

0.00 S/.

0.00%

0.00%

0.00 S/.

0.00%

0.00%

0.00 S/.

0.00%

0.00 S/.

0.00%

VALOR S/.

24.74

100.00%

0.96 S/.

161.02

100.00%

2.00 S/.

1,081.60

100.00%

0.00%

2.00 S/.

178.56

100.00%

0.00%

2.00 S/.

599.72

100.00%

0.00 S/.

0.00%

2,315.65 S/.

12,712.92

100.00%

0.00%

0.00 S/.

0.00%

593.00 S/.

2,567.69

100.00%

0.00%

0.00 S/.

0.00%

1.00 S/.

87.79

100.00%

0.00%

0.00 S/.

0.00%

180.00 S/.

1,238.40

100.00%

0.00%

0.00 S/.

0.00%

180.00 S/.

882.00

100.00%

0.00%

0.00 S/.

0.00%

180.00 S/.

705.60

100.00%

0.00%

0.00 S/.

0.00%

130.00 S/.

1,623.70

100.00%

0.00%

0.00 S/.

0.00%

50.00 S/.

575.00

100.00%

0.00%

0.00 S/.

0.00%

12.00 S/.

267.48

100.00%

0.00%

0.00 S/.

0.00%

8.00 S/.

148.56

100.00%

0.00%

0.00 S/.

0.00%

4.00 S/.

591.52

100.00%

N DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

0.00%

0.00 S/.

0.00%

0.00%

0.00 S/.

0.00%

0.00 S/.

0.00%

0.00 S/.

0.00%

VALOR S/.

2.30 S/.

833.45

100.00%

0.00%

4.70 S/.

127.04

100.00%

0.00%

180.00 S/.

685.80

100.00%

0.00%

5.30 S/.

102.40

100.00%

0.00 S/.

0.00%

2.00 S/.

300.00

100.00%

0.00%

0.00 S/.

0.00%

341.00 S/.

3,515.71

100.00%

0.00%

0.00 S/.

0.00%

210.00 S/.

2,904.30

100.00%

0.00%

0.00 S/.

0.00%

10.00 S/.

1,847.90

100.00%

0.00%

0.00 S/.

0.00%

341.00 S/.

4,668.29

100.00%

0.00%

0.00 S/.

0.00%

1.00 S/.

285.01

100.00%

0.00%

0.00 S/.

0.00%

15.00 S/.

2,061.15

100.00%

0.00%

0.00 S/.

0.00%

15.00 S/.

4,587.60

100.00%

0.00%

0.00 S/.

0.00%

1.00 S/.

241.49

100.00%

0.00%

0.00 S/.

0.00%

3.00 S/.

1,511.22

100.00%

0.00%

0.00 S/.

0.00%

4,018.00 S/.

31,661.84

100.00%

0.00%

0.00 S/.

25.00%

0.25 S/.

0.00%

0.00 S/.

137.50
-

0.00%

15.00 S/.

166.65

100.00%

25.00%

0.75 S/.

412.50

75.00%

0.00%

1.00 S/.

7,626.00

100.00%

N DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

VALOR S/.

30.00%

9.00 S/.

94.77

30.00%

21.00 S/.

221.13

70.00%

17.08%

S/.

295,118.06

40.93%

S/.

425,871.91

59.07%

S/.

25,085.04

S/.

36,199.11

S/.

14,755.90

S/.

21,293.60

S/.

334,959.00

S/.

483,364.62

S/.

334,959.00

S/.

483,364.62

S/.

63,642.21

S/.

91,839.28

S/.

398,601.21

S/.

575,203.90

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

SERVICIOS HIGIENICOS Y VESTIDORES

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

BAOS, VESTIDORES
01

MOVIMIENTO DE TIERRAS

01.01

EXCAVACION DE ZANJA PARA CIMIENTOS

m3

100.64 S/.

25.77 S/.

2,593.49

38.58 S/.

01.02

RELLENO Y COMPACTADO MANUAL MATERIAL PROPIO

m3

42.96 S/.

8.61 S/.

369.89

0.00 S/.

ELIMINACION DE MATERIAL EXCEDENTE

m3

85.49 S/.

17.19 S/.

1,469.57

45.50 S/.

m3

77.70 S/.

148.81 S/.

11,562.54

28.05 S/.

01.03
02
02.01
02.01.01
02.02

994.21

62.06 S/.

1,599.28

42.96 S/.

369.89

782.15

39.99 S/.

687.42

4,174.83

49.65 S/.

7,388.42

CONCRETO SIMPLE
CIMIENTOS
CONCRETO:10+30% PARA CIMIENTOS CORRIDOS
SOBRECIMIENTOS

02.02.01

CONCRETO PARA SOBRECIMIENTOS 1:8+25%PM

m3

3.72 S/.

240.16 S/.

893.40

0.00 S/.

3.72 S/.

893.40

02.02.02

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS HASTA 030.M

m2

59.05 S/.

25.18 S/.

1,486.88

0.00 S/.

59.05 S/.

1,486.88

m2

127.16 S/.

22.36 S/.

2,843.30

0.00 S/.

0.00 S/.

02.03
03
03.01

FALSO PISO DE 4" MEZCLA 1:8 CEMENTO HORMIGON

CONCRETO ARMADO
COLUMNAS

03.01.01

CONCRETO COLUMNAS f'c=210 kg/cm2

m3

16.70 S/.

355.53 S/.

5,937.35

0.00 S/.

16.70 S/.

5,937.35

03.01.02

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

m2

215.70 S/.

35.84 S/.

7,730.69

0.00 S/.

215.70 S/.

7,730.69

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

2,863.00 S/.

3.99 S/.

11,423.37

0.00 S/.

2,863.00 S/.

11,423.37

m3

4.07 S/.

282.17 S/.

1,148.43

0.00 S/.

1.38 S/.

388.41

03.01.03
03.02
03.02.01

VIGAS
CONCRETO VIGAS f'c=210 kg/cm2

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

SERVICIOS HIGIENICOS Y VESTIDORES

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

03.02.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

33.96 S/.

39.07 S/.

1,326.82

0.00 S/.

11.61 S/.

453.68

03.02.03

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

577.17 S/.

3.99 S/.

2,302.91

0.00 S/.

161.17 S/.

643.06

CONCRETO LOSAS ALIGERADAS f'c= 210 kg/cm2

m3

11.13 S/.

273.51 S/.

3,044.17

0.00 S/.

3.48 S/.

950.58

03.03.02

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

m2

126.00 S/.

33.80 S/.

4,258.80

0.00 S/.

47.00 S/.

1,588.60

03.03.03

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

629.31 S/.

3.99 S/.

2,510.95

0.00 S/.

137.28 S/.

547.76

03.03.04

LADRILLO PARA TECHO DE h=0.20 m

und

1,113.00 S/.

1.46 S/.

1,624.98

0.00 S/.

347.55 S/.

507.42

03.03
03.03.01

03.04

LOSAS ALIGERADAS

MUROS DE CONTENCION

03.04.01

CONCRETO f'c=210Kg/cm2, EN MUROS

m3

14.11 S/.

351.35 S/.

4,957.55

0.00 S/.

14.11 S/.

4,957.55

03.04.02

ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION

m2

118.00 S/.

35.94 S/.

4,240.92

100.66 S/.

3,617.58

118.00 S/.

4,240.92

03.04.03

ACERO CORRUGADO FY= 4200 kg/cm2 TRABAJADO PARA MUROS

kg

404.77 S/.

4.03 S/.

1,631.22

404.77 S/.

1,631.22

404.77 S/.

1,631.22

m2

13.88 S/.

43.99 S/.

610.58

0.00 S/.

13.88 S/.

610.58

04
04.01
05

MUROS Y TABIQUES
MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUNTA 1.5
REVOQUES ENLUCIDOS Y MOLDURAS

05.01

TARRAJEO MUROS INTERIORES

m2

311.95 S/.

16.16 S/.

5,041.11

S/.

0.00 S/.

05.02

TARRAJEO MUROS EXTERIORES

m2

291.36 S/.

21.28 S/.

6,200.14

S/.

0.00 S/.

05.03

TARRAJEO TIPO RAYADO O PRIMARIO

m2

70.48 S/.

16.26 S/.

1,146.00

S/.

0.00 S/.

05.04

CIELORASO

m2

126.00 S/.

32.83 S/.

4,136.58

S/.

0.00 S/.

06

PISOS Y PAVIMENTOS

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

SERVICIOS HIGIENICOS Y VESTIDORES

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

06.01

CONTRAPISO DE 2"

m2

126.00 S/.

18.37 S/.

2,314.62

S/.

0.00 S/.

06.02

PISO CERAMICO 30 X 30

m2

127.68 S/.

34.76 S/.

4,438.16

S/.

0.00 S/.

m2

70.48 S/.

53.87 S/.

3,796.76

S/.

0.00 S/.

07
07.01
08

ZOCALOS
ZOCALO DE CERAMICA 30 X 30 EN BAO O SIMILAR
CARPINTERIA DE MADERA

08.01

PUERTA DE MADERA TORNILLO O SIMILAR

m2

10.80 S/.

341.50 S/.

3,688.20

S/.

0.00 S/.

08.02

PUERTA CONTRAPLACADA 45MM TRIPLAY

m2

1.92 S/.

226.66 S/.

435.19

S/.

0.00 S/.

09

CARPINTERIA METALICA

09.01

DIVISIONES METALICAS PARA BAOS

und

12.00 S/.

100.84 S/.

1,210.08

S/.

0.00 S/.

09.02

PUERTA METALICA

m2

11.76 S/.

761.77 S/.

8,958.42

S/.

0.00 S/.

p2

45.00 S/.

6.52 S/.

293.40

S/.

0.00 S/.

10
10.01
11

VIDRIOS CRISTALES Y SIMILARES


VIDRIO SEMIDOBLE (3 mm.) SUMINISTRO Y COLOCACION
PINTURAS

11.01

PINTURA LATEX EN MUROS INTERIORES

m2

311.95 S/.

6.21 S/.

1,937.21

S/.

0.00 S/.

11.02

PINTURA LATEX EN CIELO RASO

m2

127.68 S/.

7.27 S/.

928.23

S/.

0.00 S/.

11.03

PINTURA EN CARPINTERIA METALICA

m2

87.90 S/.

9.57 S/.

841.20

S/.

0.00 S/.

pto

14.00 S/.

92.82 S/.

1,299.48

S/.

0.00 S/.

12
12.01
12.01.01

INSTALACIONES ELECTRICAS
PUNTOS DE LUZ Y TOMACORRIENTES
SALIDA PARA CENTRO DE LUZ INTERRUPTOR DE COMNUTACION

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

SERVICIOS HIGIENICOS Y VESTIDORES

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

12.01.02

SALIDA PARA BRAQUETS PVC C/CABLE AWG TW 25MM +TUB SEL

pto

15.00 S/.

142.67 S/.

2,140.05

S/.

0.00 S/.

12.01.03

SALIDA PARA TOMACORRIENTE BIPOLAR SIMPLES CON PVC

pto

16.00 S/.

63.06 S/.

1,008.96

S/.

0.00 S/.

TUBERIA PVC SEL 1"X3MT

60.00 S/.

11.41 S/.

684.60

S/.

0.00 S/.

TUBERIA PVC SEL 20mmX3MT

112.00 S/.

12.84 S/.

1,438.08

S/.

0.00 S/.

12.02
12.02.01
12.02.02
12.03

CANALIZACIONES Y TUBERIAS

TABLEROS ELECTRICOS

12.03.01

ACOMETIDA TABLERO GENERAL

12.00 S/.

5.64 S/.

67.68

S/.

0.00 S/.

12.03.02

EXCAVACION DE ZANJAS de .50x.65MT

12.00 S/.

8.59 S/.

103.08

S/.

0.00 S/.

12.03.03

TABLERO DE DISTRIBUCION

und

2.00 S/.

105.54 S/.

211.08

S/.

0.00 S/.

12.03.04

INTERRUPTOR TERMOMAGNETICO MONOFASICO 2X15A

und

2.00 S/.

105.54 S/.

211.08

S/.

0.00 S/.

12.03.05

INTERRUPTOR TERMOMAGNETICO MONOFASICO 2X20A

und

2.00 S/.

30.55 S/.

61.10

S/.

0.00 S/.

12.04

ARTEFACTOS DE ILUMINACION

12.04.01

ARTEFACTO PARA DOS FLUORESCENTES

und

2.00 S/.

76.82 S/.

153.64

S/.

0.00 S/.

12.04.02

ARTEFACTO PARA DOS CIRCULAR 32W

und

5.00 S/.

63.20 S/.

316.00

S/.

0.00 S/.

12.04.03

ARTEFACTO BRAQUETE DIRIGILE O1 LAMPARA

und

3.00 S/.

52.69 S/.

158.07

S/.

0.00 S/.

und

1.00 S/.

503.74 S/.

503.74

S/.

0.00 S/.

12.05
12.05.01
13
13.01

POZO A TIERRA
POZO A TIERRA
INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

SERVICIOS HIGIENICOS Y VESTIDORES

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

AVANCE ACTUAL

VALOR S/.

METRADO

VALOR S/.

13.01.01

SALIDA DE PVC SAL PARA DESAGUE 2"

pto

34.00 S/.

60.15 S/.

2,045.10

S/.

34.00 S/.

2,045.10

13.01.02

SALIDA DE PVC SAL PARA DESAGUE 4"

pto

10.00 S/.

71.07 S/.

710.70

S/.

10.00 S/.

710.70

13.01.03

SALIDA DE VENTILACION 2"

pto

8.00 S/.

62.77 S/.

502.16

S/.

8.00 S/.

502.16

13.01.04

REGISTRO DE BRONCE 4"

pza

4.00 S/.

52.92 S/.

211.68

S/.

0.00 S/.

13.01.05

SUMIDERO DE BRONCE ROSCADO 2"

und

9.00 S/.

41.71 S/.

375.39

S/.

0.00 S/.

13.01.06

SOMBRERO DE VENTILACION 2"

und

8.00 S/.

10.37 S/.

82.96

S/.

0.00 S/.

13.01.07

CAJA DE REGISTRO DE 12"X24" CON TAPA DE CONCRETO

und

3.00 S/.

137.35 S/.

412.05

S/.

0.00 S/.

13.02

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

13.02.01

SALIDA DE AGUA FRIA TCON TUBERIA PVC SAP 1/2"

pto

42.00 S/.

103.49 S/.

4,346.58

S/.

0.00 S/.

13.02.02

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP

15.00 S/.

14.38 S/.

215.70

S/.

0.00 S/.

13.02.03

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

14.00 S/.

12.74 S/.

178.36

S/.

0.00 S/.

13.02.04

VALVULA COMPUERTA D 1/2"

pza

4.00 S/.

55.65 S/.

222.60

S/.

0.00 S/.

LLAVE DE RIEGO CON GRIFO 1/2"

pza

1.00 S/.

40.75 S/.

40.75

S/.

0.00 S/.

13.02.05
13.03

APARATOS Y ACCESORIOS SANITARIOS

13.03.01

INODORO DE TANQUE BAJO ADULTO (NAC. BLANCO)

pza

8.00 S/.

127.00 S/.

1,016.00

S/.

0.00 S/.

13.03.02

LAVATORIO BLANCO DE PARED 1 LLAVE

pza

16.00 S/.

50.42 S/.

806.72

S/.

0.00 S/.

13.03.03

PAPELERA DE LOZA BLANCA DE 13X15CM

pza

8.00 S/.

15.00 S/.

120.00

S/.

0.00 S/.

13.03.04

COLOCACION DE APARATOS SANITARIOS

und

24.00 S/.

56.48 S/.

1,355.52

S/.

0.00 S/.

13.03.05

COLOCACION DE ACCESORIOS SANITARIOS

pza

8.00 S/.

18.93 S/.

151.44

S/.

0.00 S/.

VALORIZACIN DE OBRA N 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

LOCALIDAD

PROP.

: MUNICIPALIDAD DISTRITAL DE TIABAYA

DISTRITO

EJECUTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

PROVINCIA

PERIODO

: MARZO 2011
S/.1,163,936.88

DEPARTAMENTO

MONTO REF.
SUB PRESUP.

PLAZO DE EJECUCIN

SERVICIOS HIGIENICOS Y VESTIDORES

PARTIDA

PRESUPUESTO CONTRATADO

DESCRIPCION
UND.

14
14.01

METRADO

P.UNITARIO

AVANCE ANTERIOR

P.PARCIAL

METRADO

VALOR S/.

AVANCE ACTUAL
METRADO

VALOR S/.

VARIOS
LIMPIEZA PERMANENTE EN OBRA

glb

278.75 S/.

1.03 S/.

287.11

55.75 S/.

57.42

69.69 S/.

71.78

S/.

140,770.57

S/.

11,257.40

S/.

57,366.22

COSTO DIRECTO
GASTOS GENERALES

8.50%

S/.

11,965.50

S/.

956.88

S/.

4,876.13

UTILIDAD

5.00%

S/.

7,038.53

S/.

562.87

S/.

2,868.31

S/.

159,774.60

S/.

12,777.15

S/.

65,110.66

S/.

159,774.60

S/.

12,777.15

S/.

65,110.66

S/.

30,357.17

19.00% S/.

2,427.66

19.00% S/.

12,371.03

S/.

190,131.77

S/.

15,204.81

S/.

77,481.69

SUB TOTAL
FACTOR DE RELACION

1.0000

SUB TOTAL FACTOR DE RELACION


IGV
TOTAL

19%

DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

VALOR S/.

61.67%

100.64 S/.

2,593.49

100.00%

0.00 S/.

0.00%

100.00%

42.96 S/.

369.89

100.00%

0.00 S/.

0.00%

46.78%

85.49 S/.

1,469.57

100.00%

0.00 S/.

0.00%

63.90%

77.70 S/.

11,563.25

100.01%

0.00 S/.

100.00%

3.72 S/.

893.40

100.00%

0.00 S/.

0.00%

100.00%

59.05 S/.

1,486.88

100.00%

0.00 S/.

0.00%

0.00%

0.00 S/.

0.00%

127.16 S/.

100.00%

16.70 S/.

5,937.35

100.00%

0.00 S/.

0.00%

100.00%

215.70 S/.

7,730.69

100.00%

0.00 S/.

0.00%

100.00%

2,863.00 S/.

11,423.37

100.00%

0.00 S/.

0.00%

33.82%

1.38 S/.

388.41

33.82%

2.69 S/.

-0.71

2,843.30

760.02

-0.01%

100.00%

66.18%

DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

VALOR S/.

34.19%

11.61 S/.

453.68

34.19%

22.35 S/.

873.14

65.81%

27.92%

161.17 S/.

643.06

27.92%

416.00 S/.

1,659.85

72.08%

31.23%

3.48 S/.

950.58

31.23%

7.65 S/.

2,093.59

68.77%

37.30%

47.00 S/.

1,588.60

37.30%

79.00 S/.

2,670.20

62.70%

21.81%

137.28 S/.

547.76

21.81%

492.03 S/.

1,963.19

78.19%

31.23%

347.55 S/.

507.42

31.23%

765.45 S/.

1,117.56

68.77%

100.00%

14.11 S/.

4,957.55

100.00%

0.00 S/.

100.00%

218.66 S/.

7,858.50

185.30%

-100.66 S/.

-3,617.58

-85.30%

100.00%

809.54 S/.

3,262.44

200.00%

-404.77 S/.

-1,631.22

-100.00%

100.00%

13.88 S/.

610.58

100.00%

0.00 S/.

0.00%

0.00 S/.

0.00%

311.95 S/.

5,041.11

100.00%

0.00%

0.00 S/.

0.00%

291.36 S/.

6,200.14

100.00%

0.00%

0.00 S/.

0.00%

70.48 S/.

1,146.00

100.00%

0.00%

0.00 S/.

0.00%

126.00 S/.

4,136.58

100.00%

0.00%

0.00%

DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

VALOR S/.

0.00%

0.00 S/.

0.00%

126.00 S/.

2,314.62

100.00%

0.00%

0.00 S/.

0.00%

127.68 S/.

4,438.16

100.00%

0.00%

0.00 S/.

0.00%

70.48 S/.

3,796.76

100.00%

0.00%

0.00 S/.

0.00%

10.80 S/.

3,688.20

100.00%

0.00%

0.00 S/.

0.00%

1.92 S/.

435.19

100.00%

0.00%

0.00 S/.

0.00%

12.00 S/.

1,210.08

100.00%

0.00%

0.00 S/.

0.00%

11.76 S/.

8,958.42

100.00%

0.00%

0.00 S/.

0.00%

45.00 S/.

293.40

100.00%

0.00%

0.00 S/.

0.00%

311.95 S/.

1,937.21

100.00%

0.00%

0.00 S/.

0.00%

127.68 S/.

928.23

100.00%

0.00%

0.00 S/.

0.00%

87.90 S/.

841.20

100.00%

0.00%

0.00 S/.

0.00%

14.00 S/.

1,299.48

100.00%

DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

VALOR S/.

0.00%

0.00 S/.

0.00%

15.00 S/.

2,140.05

100.00%

0.00%

0.00 S/.

0.00%

16.00 S/.

1,008.96

100.00%

0.00%

0.00 S/.

0.00%

60.00 S/.

684.60

100.00%

0.00%

0.00 S/.

0.00%

112.00 S/.

1,438.08

100.00%

0.00%

0.00 S/.

0.00%

12.00 S/.

67.68

100.00%

0.00%

0.00 S/.

0.00%

12.00 S/.

103.08

100.00%

0.00%

0.00 S/.

0.00%

2.00 S/.

211.08

100.00%

0.00%

0.00 S/.

0.00%

2.00 S/.

211.08

100.00%

0.00%

0.00 S/.

0.00%

2.00 S/.

61.10

100.00%

0.00%

0.00 S/.

0.00%

2.00 S/.

153.64

100.00%

0.00%

0.00 S/.

0.00%

5.00 S/.

316.00

100.00%

0.00%

0.00 S/.

0.00%

3.00 S/.

158.07

100.00%

0.00%

0.00 S/.

0.00%

1.00 S/.

503.74

100.00%

DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

VALOR S/.

100.00%

34.00 S/.

2,045.10

100.00%

0.00 S/.

0.00%

100.00%

10.00 S/.

710.70

100.00%

0.00 S/.

0.00%

100.00%

8.00 S/.

502.16

100.00%

0.00 S/.

0.00%

0.00%

0.00 S/.

0.00%

4.00 S/.

211.68

100.00%

0.00%

0.00 S/.

0.00%

9.00 S/.

375.39

100.00%

0.00%

0.00 S/.

0.00%

8.00 S/.

82.96

100.00%

0.00%

0.00 S/.

0.00%

3.00 S/.

412.05

100.00%

0.00%

0.00 S/.

0.00%

42.00 S/.

4,346.58

100.00%

0.00%

0.00 S/.

0.00%

15.00 S/.

215.70

100.00%

0.00%

0.00 S/.

0.00%

14.00 S/.

178.36

100.00%

0.00%

0.00 S/.

0.00%

4.00 S/.

222.60

100.00%

0.00%

0.00 S/.

0.00%

1.00 S/.

40.75

100.00%

0.00%

0.00 S/.

0.00%

8.00 S/.

1,016.00

100.00%

0.00%

0.00 S/.

0.00%

16.00 S/.

806.72

100.00%

0.00%

0.00 S/.

0.00%

8.00 S/.

120.00

100.00%

0.00%

0.00 S/.

0.00%

24.00 S/.

1,355.52

100.00%

0.00%

0.00 S/.

0.00%

8.00 S/.

151.44

100.00%

DE OBRA N 02
: PATASAGUA ALTO
: TIABAYA
: AREQUIPA
: AREQUIPA
PLAZO DE EJECUCIN

: 120 DIAS CALENDARIOS

AVANCE ACTUAL

AVANCE ACUMULADO
%

METRADO

VALOR S/.

SALDOS
%

METRADO

VALOR S/.

25.00%

125.44 S/.

129.20

45.00%

153.31 S/.

157.91

55.00%

40.75%

S/.

68,623.62

48.75%

S/.

72,146.95

51.25%

S/.

5,833.01

S/.

6,132.49

S/.

3,431.18

S/.

3,607.35

S/.

77,887.81

S/.

81,886.79

S/.

77,887.81

S/.

81,886.79

S/.

14,798.68

S/.

15,558.49

S/.

92,686.49

S/.

97,445.28

HOJA DE METRADOS VALORIZACION N 02


PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 001 COMPLEJO DEPORTIVO PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.
PARTIDA

DESCRIPCION

03.00.

MOVIMIENTO DE TIERRAS

03.01.

NIVELACION Y COMPACTACION

03.02.

EXCAVACION DE ZANJAS PARA CIMIENTOS

03.03.

03.04.

VECES

0.50

LONG.

ANCHO

ALTURA

6,663.90

3-3' MUROS NIVEL 7.00

1.00

6.37

0.70

1.00

8-8' MURO DE CONTENCION N 14.00

1.00

30.70

1.50

1.00

8-8' MURO DE CONTENCION N 12.00

1.00

30.00

1.50

1.00

12-12' MURO NIVEL 6.70

1.00

9.68

1.55

1.00

15-15' MURO DE CONTENCION EN GRADERIAS

1.00

55.00

0.70

0.75

16-16'MURO DE CONTENCION CAMPO DEPORTIVO.

1.00

34.80

1.90

1.30

18-18' CONTIGUAS A ESCALERAS

1.00

15.24

0.30

0.25

18-18' EN JARDINERAS

3.00

62.00

0.30

0.25

19.19' LATERALES

1.00

3.90

0.50

0.30

21-21' MURO ENTRE GRADERIAS Y COMPLEJO

1.00

55.00

0.50

0.35

22-22' MURO PARTE TRASERA

1.00

76.00

0.35

1.05

3-3' MUROS NIVEL 7.00

1.00

6.37

0.10

0.35

3-3' MURO FUENTE.

1.00

5.14

0.10

0.35

8-8' MURO DE CONTENCION N 14.00

1.00

31.52

0.20

2.50

8-8' MURO DE CONTENCION N 12.00

1.00

33.00

0.20

2.50

14-14 MURO DE CONTENCION LATERAL EN LOSA DEPORTIVA

1.00

15.00

0.20

0.10

15-15' MURO DE CONTENCION EN GRADERIAS

1.00

55.00

1.00

0.66

1.00

15.00

1.30

1.30

16-16'MURO DE CONTENCION CAMPO DEPORTIVO.

1.00

22.35

1.30

1.30

18-18' CONTIGUAS A ESCALERAS

1.00

15.67

0.30

0.10

18-18' EN JARDINERAS

3.00

62.00

0.30

0.10

19.19' LATERALES

1.00

3.90

0.50

0.10

21-21' MURO ENTRE GRADERIAS Y COMPLEJO

1.00

55.00

0.50

0.10

0.60

5.00

24.00

1-1' CERCO

1.00

46.27

0.70

0.50

2-2'

1.00

4.85

1.10

0.70

1.00

6.57

1.10

0.70

1.00

6.37

0.70

0.50

RELLENO COMPACTADO C/EQUIPO

RELLENO COMPACTADO MANUAL CON MATERIAL DE PRESTAMO


RELLENO DEL TERRENO

03.05.

ACARREO DE MATERIAL INTERNO.

04.00.

OBRAS DE CONCRETO SIMPLE

04.01.

CIMIENTOS CORRIDOS + 30%DE PIEDRA

3-3' MUROS NIVEL 7.00

HOJA DE METRADOS VALORIZACION N 02


PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 001 COMPLEJO DEPORTIVO PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.
PARTIDA

04.02.

DESCRIPCION

VECES

LONG.

ANCHO

ALTURA

7-7' MURO DE CONTENCION NPT +20.00

1.00

10.20

1.10

0.40

7-7' MURO DE CONTENIOCN NPT +18

1.00

6.54

1.10

0.40

8-8' MURO DE CONTENCION N 14.00

1.00

31.52

1.50

0.60

8-8' MURO DE CONTENCION N 12.00

1.00

33.00

1.50

0.60

9-9' MURO DE CONTENCION N 9.25 LATERAL

1.00

5.80

1.55

0.60

12-12' MURO NIVEL 6.70

1.00

9.68

1.55

0.60

13-13' DIVISION DE ESCALERAS

1.00

7.37

0.60

0.80

13-13' DIVISION DE GRADERIAS LATERAL IZQUIERDO

1.00

4.70

0.60

0.80

13-13' DIVISION DE GRADERIAS LATERAL DERECHO

1.00

4.70

0.60

0.80

1.00

4.85

0.15

1.40

1.00

6.57

0.15

1.40

CONCRETO CICLOPEO FC140KGCM2 +70% PM DE MUROS


1-1' tramo entre escaleras
2-2'

04.03.

3-3' MUROS NIVEL 7.00

1.00

6.37

0.15

1.10

7-7' MURO DE CONTENCION NPT +20.00

1.00

10.20

0.15

0.60

7-7' MURO DE CONTENIOCN NPT +18

1.00

6.54

0.15

0.60

9-9' MURO DE CONTENCION N 9.25 GRADERIAS

1.00

35.00

0.15

0.60

9-9' MURO DE CONTENCION N 9.25 LATERAL

1.00

5.80

0.15

0.60

12-12' MURO NIVEL 6.70

1.00

9.68

0.15

0.40

3-3' MUROS NIVEL 7.00

1.00

6.37

0.40

1.50

7-7' MURO DE CONTENCION NPT +20.00

1.00

10.20

0.60

2.00

7-7' MURO DE CONTENIOCN NPT +18

1.00

6.54

0.60

2.00

8-8' MURO DE CONTENCION N 12.00

1.00

33.00

0.70

2.40

12-12' MURO NIVEL 6.70

1.00

9.68

0.70

3.20

1-1' CERCO

1.00

46.27

3.30

2-2'

1.00

4.85

2.30

1.00

6.57

2.30

1.00

6.37

2.20

1.00

5.14

2.20

7-7' MURO DE CONTENCION NPT +20.00

1.00

10.20

1.20

7-7' MURO DE CONTENIOCN NPT +18

1.00

6.54

1.20

9-9' MURO DE CONTENCION N 9.25 GRADERIAS

1.00

35.00

1.20

9-9' MURO DE CONTENCION N 9.25 LATERAL

1.00

5.80

1.20

12-12' MURO NIVEL 6.70

1.00

9.68

0.80

21-21' MURO ENTRE GRADERIAS Y COMPLEJO

1.00

55.00

0.70

3-3' MUROS NIVEL 7.00

1.00

6.37

1.50

7-7' MURO DE CONTENCION NPT +20.00

1.00

10.20

2.00

7-7' MURO DE CONTENIOCN NPT +18

1.00

6.54

2.00

8-8' MURO DE CONTENCION N 14.00

1.00

31.52

2.40

ENCOFRADO PARA MUROS


1-1' tramo entre escaleras

3-3' MUROS NIVEL 7.00

HOJA DE METRADOS VALORIZACION N 02


PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 001 COMPLEJO DEPORTIVO PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.
PARTIDA

04.06.

DESCRIPCION

LONG.

ANCHO

ALTURA

8-8' MURO DE CONTENCION N 12.00

1.00

33.00

2.40

12-12' MURO NIVEL 6.70

1.00

9.68

3.20

5.4

1.7

5.4

1.1

CONCRETO ESCALERAS FC=140KG/CM2


ESCALERAS N5

04.08.

VECES

0.23

ENCOFRADO Y DESENCOFRADO EN GRADERIAS


ESCALERAS N5

05.00.

OBRAS DE CONCRETO ARMADO

05.01.

CONCRETO FC=210KG/CM2 EN ZAPATAS


Z-1

2.00

0.80

1.50

0.50

Z-2

1.00

0.80

1.10

0.50

1.00

3.27

0.15

1.65

1.00

3.99

0.15

1.65

1.00

4.05

0.15

1.65

1.00

7.37

0.15

1.65

17-17' MURO DE CONTENCION

1.00

8.92

0.25

2.30

17-17' MURO DE CONTENCION

1.00

8.10

0.25

2.10

17-17' MURO DE CONTENCION

1.00

9.45

0.25

1.75

17-17' MURO DE CONTENCION

1.00

10.61

0.25

1.45

1.00

46.27

05.02.

ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS


ACERO EN ZAPATAS (VER HOJA DE ACEROS)

05.03.

MUROS DE CONCRETO FC=210KG/CM2


1-1' tramo entre escaleras

05.04.

MUROS ACERO FY=4200KG/CM2


ACERO EN MUROS (VER HOJA DE ACEROS)

05.05.

MUROS ENCOFRADO Y DESENCOFRADO


1-1' tramo entre escaleras
1-1' CERCO

05.06.

05.07.

3.30

CONCRETO EN COLUMNAS f'c=210 kg/cm2


C-4

0.25 x 0.50

10.00

0.25

0.50

3.50

C-4

0.25 x 0.50

1.00

0.25

0.50

3.50

ENCOFRADO COLUMNAS
COLUMNAS

HOJA DE METRADOS VALORIZACION N 02


PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 001 COMPLEJO DEPORTIVO PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.
PARTIDA

05.08.

DESCRIPCION

VECES

LONG.

ANCHO

ALTURA

C-4

0.25 x 0.50

10.00

1.50

3.50

C-4

0.25 x 0.50

1.00

1.50

3.50

6.00

4.20

6.00

8.70

0.40

1.00

3.27

3.30

1.00

3.99

3.30

1.00

4.05

3.30

1.00

7.37

3.30

1.00

4.85

2.30

1.00

6.57

2.30

3-3' MUROS EN GRADERIAS

4.00

3.00

2.20

3-3' EN GRADERIAS

5.00

1.91

2.20

3-3' MUROS NIVEL 7.00

1.00

6.37

2.20

4-4' MUROS EN GRADERIAS

4.00

4.03

2.00

ACERO COLUMNAS
5.09 CONCRETO EN VIGAS FC=210KG/CM
V - 102

05.10.

0.15

0.40

ACERO EN VIGAS
ACERO EN VIGAS VER HOJA DE ACEROS

05.11.

ENCOFRADO EN VIGAS
V - 102

06.00.

REVOQUES ENLUCIDOS Y MOLDURAS

06.01.

TARRAJEOS VARIOS
1-1' tramo entre escaleras

2-2'

4.00

1.50

1.40

4-4' MUROS EN GRADERIAS

1.00

1.38

2.20

7-7' MURO DE CONTENCION NPT +20.00

1.00

10.20

1.20

7-7' MURO DE CONTENIOCN NPT +18

1.00

6.54

1.20

8-8' MURO DE CONTENCION N 12.00

1.00

33.00

0.60

9-9' MURO DE CONTENCION N 9.25 GRADERIAS

1.00

35.00

1.20

9-9' MURO DE CONTENCION N 9.25 LATERAL

1.00

5.80

1.20

12-12' MURO NIVEL 6.70

1.00

9.68

0.80

HOJA DE METRADOS VALORIZACION N 02


PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 001 COMPLEJO DEPORTIVO PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.
PARTIDA

DESCRIPCION

VECES

LONG.

ANCHO

ALTURA

3-3' MUROS EN GRADERIAS

4.00

3.00

1.50

3-3' EN GRADERIAS

5.00

1.91

1.50

3-3' MUROS NIVEL 7.00

1.00

6.37

1.50

3-3' MURO FUENTE.

1.00

5.14

1.50

7-7' MURO DE CONTENCION NPT +20.00

1.00

10.20

1.40

7-7' MURO DE CONTENIOCN NPT +18

1.00

6.54

1.40

9-9' MURO DE CONTENCION N 9.25 GRADERIAS

1.00

35.00

2.70

9-9' MURO DE CONTENCION N 9.25 LATERAL

1.00

5.80

2.70

12-12' MURO NIVEL 6.70

1.00

9.68

2.70

17-17' A MURO DE CONTENCION

1.00

8.92

2.00

17-17' b MURO DE CONTENCION

1.00

8.10

1.70

17-17' c MURO DE CONTENCION

1.00

9.45

1.30

17-17' d MURO DE CONTENCION

1.00

10.61

1.05

DOS VALORIZACION N 02

ALTO - TIABAYA".

SUB-TOTAL

TOTAL

UNID.

3,331.95

m2

278.58
4.46

m3

46.05

m3

45.00

m3

15.00
28.88

m3

85.96
1.14

m3

13.95

m3

0.59

m3

9.63

m3

27.93
141.37
0.22

m3

0.18

m3

15.76

m3

16.50

m3

0.30

m3

36.30

m3

25.35
37.76
0.47

m3

5.58

m3

0.20

m3

2.75

m3

72.00

m3

137.21

m2

72.00

115.10
16.19

m3

3.73

m3

5.06

m3

2.23

m3

DOS VALORIZACION N 02

ALTO - TIABAYA".

SUB-TOTAL

TOTAL

UNID.

4.49

m3

2.88

m3

28.37

m3

29.70

m3

5.39

m3

9.00

m3

3.54

m3

2.26

m3

2.26

m3

110.24

ml

1.02

m3

1.38

m3

1.05

m3

0.92

m3

0.59

m3

3.15

m3

0.52

m3

0.58

m3

3.82

m3

12.24

m3

7.85

m3

55.44

m3

21.68

m3

548.43

ml

152.69

m2

11.16

m2

15.11

m2

14.01

m2

11.31

m2

12.24

m2

7.85

m2

42.00

m2

6.96

m2

7.74

m2

38.50

m2

9.56

m2

20.40

m2

13.08

m2

75.65

m2

DOS VALORIZACION N 02

ALTO - TIABAYA".

SUB-TOTAL

TOTAL

UNID.

79.20

m2

30.98

m2

10.56
10.56

m3
29.70

29.70

m2

1.64
1.20

m3

0.44

m3
1,080.80

0.81

1,080.80

KG

21.99

m3

1,303.00

KG

152.69

ml

4.81

ml

0.99
1.00
1.82
5.13
4.25
4.13
3.85

152.69

4.38

m3

0.44

m3

57.75

ml

DOS VALORIZACION N 02

ALTO - TIABAYA".

SUB-TOTAL

TOTAL

UNID.

52.50

m2

5.25

m2
205.26

KG

1.51

ml

1.51

m3

449.12

KG

20.88

ml

20.88

10.79

m2

553.96

m2

13.17

m2

13.37

m2

24.32

m2

11.16

m2

15.11

m2

26.40

m2

21.01

m2

14.01

m2

32.24

m2

8.40

m2

3.04

m2

12.24

m2

7.85

m2

19.80

m2

42.00

m2

6.96

m2

7.74

m2

DOS VALORIZACION N 02

ALTO - TIABAYA".

SUB-TOTAL

TOTAL

UNID.

18.00

m2

14.33

m2

9.56

m2

7.71

m2

14.28

m2

9.16

m2

94.50

m2

15.66

m2

26.14

m2

17.84

m2

13.77

m2

12.29

m2

11.14

m2

HOJA DE METRADOS DE ACERO


VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 001 COMPLEJO DEPORTIVO PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.

ITEM

DECRIPCION

DIAM

N ELE

N VEC

LONG

171.00

1.25
34.00

3/4"

5/8"

ZAPATAS
16-16'MURO DE CONTENCION CAMPO DEPORTIVO.
1/2

1.00

34.00

0.20

1/2

1.00

1.25

0.20

8.00

1/2

1.00

34.00

0.20

171.00

1.75

1/2

1.00

1.75

0.20

8.70

34.00
0.00
1.55
0.00

MUROS
16-16'MURO DE CONTENCION CAMPO DEPORTIVO.
3/8

2.00

4.00

0.20

21.00

34.80

1/2

2.00

34.80

0.20

47.50

5.10
0.00
1.55
0.00

COLUMNAS

1/2
1/2

5.00

6.00

6.84
0.00
1.55
0.00

VIGAS

1/2
1/2

5.00

4.00

7.50

3/8

2.00

0.15

4.00

5.39

1/2

2.00

0.15

6.00

5.39

3/8

2.00

0.15

4.00

12.76

1/2

2.00

0.15

6.00

12.76
0.00
1.55
0.00

OJA DE METRADOS DE ACERO


VALORIZACION 02

ASAGUA ALTO - TIABAYA".

1/2"

3/8"

1/4"

1080.80

0.00

0.00

1.00

0.56

0.25

1080.80

0.00

0.00

ZAPATAS
213.75
272.00
299.25
295.80

SUMA TOTAL

1080.80

1461.60
484.50
484.50

1461.60

0.00

1.00

0.56

0.25

484.50

818.50

SUMA TOTAL

0.00
1303.00
205.26

205.26
205.26

0.00

0.00

1.00

0.56

0.25

205.26

0.00

SUMA TOTAL

0.00
205.26
449.12

150.00
43.12
64.69
102.08
153.12
367.81

145.20

0.00

1.00

0.56

0.25

367.81

81.31

SUMA TOTAL

0.00
449.12

HOJA DE METRADOS
VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 002 SERVICIOS HIGIENICOS Y VESTIDORES
EJECUTA: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.

COMPLEJO DEPORTIVO PATASAGUA - S.S.H.H.

ITEM

DESCRIPCION

MEDIDAS

VECES

01

MOVIMIENTO DE TIERRA

01.01

EXCAVACION PARA CIMENTACIONES

LARGO

ANCHO

ALTO

Excavacionn en Cimientos corridos 2

01.02

EJE A

1.00

15.60

0.50

1.50

EJE B

1.00

5.60

0.50

1.50

1.00

4.25

0.50

1.50

EJE 1

1.00

16.75

0.50

1.50

EJE 6 - 3

2.00

3.75

0.50

1.50

EJE 5 - 4

3.00

2.30

0.50

1.50

EJE C - F

2.00

3.60

0.50

1.50

EJE D - E

3.00

2.75

0.50

1.50

EJE 2

1.00

10.70

0.50

1.50

1.00

5.37

0.23

0.90

1.00

9.34

0.23

0.90

1.00

2.14

0.23

0.90

1.00

3.32

0.23

0.90

1.00

9.71

0.23

0.90

1.00

0.80

0.23

0.90

1.00

4.00

0.23

1.50

1.00

3.80

0.23

1.50

1.00

3.15

0.23

1.50

5.00

1.76

0.23

1.50

1.00

3.65

0.23

1.50

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

Excavacionn en Muro Armado 1

Excavacionn en Cimientos corridos 1

0.23

Excavacionn en Cimientos corridos 2


EJE A

1.00

15.60

0.23

1.50

EJE B

1.00

5.60

0.23

1.50

1.00

4.25

0.23

1.50

EJE 1

1.00

16.75

0.23

1.50

EJE 6 - 3

2.00

3.75

0.23

1.50

EJE 5 - 4

3.00

2.30

0.23

1.50

EJE C - F

2.00

3.60

0.23

1.50

EJE D - E

3.00

2.75

0.23

1.50

EJE 2

1.00

10.70

0.23

1.50

HOJA DE METRADOS
VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 002 SERVICIOS HIGIENICOS Y VESTIDORES
EJECUTA: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.

01.03

02
02.01
02.01.02

1.00

0.50

79.98

EJE A

1.00

15.60

0.50

1.20

EJE B

1.00

5.60

0.50

1.20

1.00

4.25

0.50

1.20

EJE 1

1.00

16.75

0.50

1.20

EJE 6 - 3

2.00

3.75

0.50

1.20

EJE 5 - 4

3.00

2.30

0.50

1.20

EJE C - F

2.00

3.60

0.50

1.20

EJE D - E

3.00

2.75

0.50

1.20

EJE 2

1.00

10.70

0.50

1.20

EJE A

1.00

15.48

0.30

0.15

EJE B

1.00

5.64

0.30

0.15

1.00

4.25

0.30

0.15

EJE 1

1.00

16.75

0.30

0.15

EJE 6 - 3

2.00

3.75

0.30

0.15

EJE 5 - 4

3.00

2.30

0.30

0.15

EJE C - F

2.00

3.60

0.30

0.15

EJE D - E

3.00

2.75

0.30

0.15

EJE 2

1.00

10.70

0.30

0.15

1.00

4.00

0.60

1.00

3.80

0.60

1.00

3.15

0.60

5.00

1.75

0.60

1.00

3.00

0.60

EJE A

1.00

15.60

0.50

EJE B

1.00

5.60

0.50

ELIMINACION DE MATERIAL EXCENDENTE MANUALMENTE

CONCRETO SIMPLE
CIMIENTO
CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

Cimientos corridos 2

02.02
02.02.01

SOBRECIMIENTO
CONCRETO PARA SOBRECIMIENTOS 1:8+25% PM

Cimientos corridos 2

02.02.02

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m

Cimientos corridos 1

Cimientos corridos 2

HOJA DE METRADOS
VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 002 SERVICIOS HIGIENICOS Y VESTIDORES
EJECUTA: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.

03
03.02
03.02.01

1.00

4.25

0.50

EJE 1

1.00

16.75

0.50

EJE 6 - 3

2.00

3.75

0.60

EJE 5 - 4

3.00

2.30

0.60

EJE C - F

2.00

3.60

0.60

EJE D - E

3.00

2.75

0.60

EJE 2

1.00

10.70

0.60

13.00

0.15

0.40

3.50

C-2

1.00

1.00

0.53

3.50

C-3

2.00

0.30

0.15

3.50

2.00

0.45

0.15

3.50

1.00

0.25

0.50

3.50

C-5

3.00

1.00

0.39

3.50

C-6

6.00

1.00

0.15

3.50

C-7

13.00

0.15

0.25

3.50

CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2

C-1

C-4

03.02.02

0.15 x 0.40

0.25 x 0.50

C-8

0.15 x 0.45

1.00

0.15

0.45

3.50

C-A

0.15 x 0.25

13.00

0.15

0.25

3.50

13.00

1.10

3.50

C-2

1.00

3.09

3.50

C-3

2.00

0.90

3.50

2.00

1.20

3.50

1.00

1.50

3.50

C-5

3.00

2.78

3.50

C-6

6.00

2.30

3.50

13.00

0.80

3.50

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

COLUMNAS
C-1

C-4

03.03
03.03.01

0.15 x 0.40

0.25 x 0.50

C-7

C.A

C-8

0.15 x 0.45

1.00

1.20

3.50

C-9

0.15 x 0.65

6.00

0.80

3.50

VS

1.00

10.15

0.25

0.20

VS

1.00

3.08

0.25

0.20

VS

1.00

3.60

0.25

0.20

VA

2.00

3.60

0.25

0.20

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2

HOJA DE METRADOS
VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 002 SERVICIOS HIGIENICOS Y VESTIDORES
EJECUTA: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.
1.00

3.50

VS

1.00

20.80

0.20

VS

1.00

6.66

0.20

VS

1.00

7.70

0.20

VA

2.00

7.70

0.20

VA- 1

1.00

7.50

0.20

1.00

0.09

39.72

1.00

1.00

47.00

1.00

8.75

39.72

1.00

VA- 1

03.03.02

0.25

0.20

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

BAO 1

03.04
03.04.01

LOSAS ALIGERADAS
CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS

BAO 1

03.04.02

03.04.04

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO

BAO 1

03.05
03.05.01

03.05.02

04
04.01
13
13.01
13.01.01
13.01.02
13.01.03

1.00

MURO DE CONTENCION
CONCRETO f'c= 210 kg/cm2 EN MUROS

EJE

1.00

9.91

0.25

3.60

EJE

1.00

3.57

0.25

3.60

EJE

4-5

1.00

2.20

0.25

3.60

ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS DE CONTENCION

EJE

1.00

20.32

3.60

EJE

1.00

7.64

3.60

EJE

4-5

1.00

4.82

3.60

MIUROS Y TABIQUES
MURO SOGA LADRILLO COCADA CEMENTO-CAL-ARENA
INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE
SALIDA DE PVC SAL PARA DESAGUE DE 2"
SALIDA DE PVC SAL PARA DESAGUE DE 4"
SALIDA DE VENTILACION DE 2"

1.00
1.00
1.00

34.00
10.00
8.00

OJA DE METRADOS
VALORIZACION 02

GUA ALTO - TIABAYA".

EPORTIVO PATASAGUA - S.S.H.H.

PARCIAL

TOTAL

UNIDAD

62.06

11.70

62.06

m3

4.20

m3

3.18

m3

12.56

m3

5.63

m3

5.18

m3

5.40

m3

6.19

m3

8.03

m3
42.96

1.11

6.35

m3

1.93

m3

0.44

m3

0.69

m3

2.01

m3

0.17

m3

1.38

8.06

m3

1.31

m3

1.09

m3

3.03

m3

1.26

m3

5.38

28.55

m3

1.93

m3

1.47

m3

5.78

m3

2.59

m3

2.38

m3

2.48

m3

2.85

m3

3.69

m3

OJA DE METRADOS
VALORIZACION 02

GUA ALTO - TIABAYA".

39.99

m3

49.65

9.36

49.65

m3

3.36

m3

2.55

m3

10.05

m3

4.50

m3

4.14

m3

4.32

m3

4.95

m3

6.42

m3

3.72

0.70

3.72

m3

0.25

m3

0.19

m3

0.75

m3

0.34

m3

0.31

m3

0.32

m3

0.37

m3

0.48

m3

59.05

2.40

m2

2.28

m2

1.89

m2

5.25

m2

1.80

m2

7.80

m2

2.80

m2

OJA DE METRADOS
VALORIZACION 02

GUA ALTO - TIABAYA".

2.13

m2

8.38

m2

4.50

m2

4.14

m2

4.32

m2

4.95

m2

6.42

m2

16.70
2.73

m3

1.86

m3

0.32

m3

0.47

m3

0.44

m3

4.10

m3

3.15

m3

1.71

m3

0.24

m3

1.71

m3
215.70

50.05

m2

10.82

m2

6.30

m2

8.40

m2

5.25

m2

29.19

m2

48.30

m2

36.40

m2

4.20

m2

16.80

m2

0.51

1.38

m3

0.15

m3

0.18

m3

0.36

m3

OJA DE METRADOS
VALORIZACION 02

GUA ALTO - TIABAYA".

0.18

4.16

m3

11.61

m2

1.33

m2

1.54

m2

3.08

m2

1.50

m2

3.48

3.48

m3

47.00

47.00

m2

347.55

347.55

m3

14.11
8.92

m3

3.21

m3

1.98

m3

118.00
73.15

m2

27.50

m2

17.35

m2

13.88

34.00
10.00
8.00

pto
pto
pto

HOJA DE METRADOS DE ACERO


VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 002 BAOS Y VESTIDORES PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.

ITEM

DECRIPCION

N ELE

N VEC

LONG

1" (8)

3/4" (6)

5/8" (5)

1/2" (4)

3/8" (3)

COLUMNAS
COLUMNAS
1/2

13

5.50

3/8

13

5.50

143.00

Estribos

3/8

13

23

1.10

328.90

C -2

5/8

5.50

1/2

5.50

Estribos

3/8

23

1.60

C -3

1/2

5.50

Estribos

3/8

23

1.80

C -4

1/2

5.50

Estribos

3/8

23

1.50

C -5 Vert

1/2

5.50

C -1

3.2

3.2
3.2
3.2

0.15

0.15
0.15
0.15

3/8

5.50

Horiz

3/9

3.2

0.15

23

1.50

Estribos

3/8

3.2

0.15

23

2.20

C -6

5/8

5.50

Estribos

3/8

3.2

0.15

23

2.20

C -7

1/2

13

5.50

3/8

13

Estribos

3/8

13

C -8

1/2

3/8

Estribos

3/8

C -A

3/8

13

Estribos

3/8

13

3.2

3.2
3.2

0.15

0.15
0.15

5.50

23

1.60

5.50

286.00

22.00
11.00
36.80
77.00
82.80
33.00
34.50
132.00
33.00
151.80
198.00
303.60
286.00
478.40
22.00

5.50

23

1.48

22.00
34.00

5.50

429.00

23

1.50

448.50

Longitud (m)

0.00

0.00

220.00

847.00

Peso (Kg/m)

7.91

3.97

1.55

1.00

2526.30
0.56

Peso (Kg)

0.00

0.00

341.00

847.00

1414.73

26.89

103.52

308.77

TOTAL (Kg)
0.00
Varillas de 9.00m

ITEM

DECRIPCION

N ELE

N VEC

0.00
-

LONG

1" (8)

3/4" (6)

27

104

309

5/8" (5)

1/2" (4)

3/8" (3)

VIGAS
VIGAS
BAO 1
V S Vert

3/8

Estribos

3/8

V S Horiz

3/8

13

0.2

14.00

56.00

66

0.90

59.40

4.10

HOJA DE METRADOS DE ACERO


VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 002 BAOS Y VESTIDORES PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.

ITEM

DECRIPCION

N ELE

Estribos

3/8

VA

1/2

Estribos

3/8

VA-1

1/2

Estribos

3/8

4.9
4.9
4.9

0.2
0.2
0.15

N VEC

LONG

26

0.90

4.10

26

0.90

4.10

21

0.90

1" (8)

3/4" (6)

5/8" (5)

1/2" (4)

3/8" (3)

32.80
46.80
12.30
18.90

Longitud (m)

0.00

0.00

0.00

45.10

Peso (Kg/m)

7.91

3.97

1.55

1.00

181.10
0.56

Peso (Kg)

0.00

0.00

0.00

45.10

101.42

0.00

0.00

0.00

5.51

22.13

TOTAL (Kg)

Varillas de 9.00m

ITEM

DECRIPCION

N ELE

N VEC

LONG

1" (8)

3/4" (6)

5/8" (5)

22

1/2" (4)

3/8" (3)

TECHO
TECHO
BAO 1
As

1/2

9.5

0.3

33

3.60

Refuerzo

3/8

9.5

0.3

10.72

1.00

As

1/2

0.3

7.4

3.35

Refuerzo

3/8

0.3

1.00

As Temperatura

1/4

3.6

0.2

12.20

118.80
10.72

Longitud (m)

0.00

0.00

0.00

118.80

10.72

Peso (Kg/m)

7.91

3.97

Peso (Kg)

0.00

0.00

1.55

1.00

0.56

0.00

118.80

6.00

0.00

0.00

0.00

14.52

1.31

TOTAL (Kg)

Varillas de 9.00m

ITEM

DECRIPCION

N ELE

N VEC

LONG

MURO ARMADO
MURO ARMADO

1" (8)

3/4" (6)

5/8" (5)

15

1/2" (4)

3/8" (3)

HOJA DE METRADOS DE ACERO


VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO - TIABAYA".
SUB-PRESUPUESTO: 002 BAOS Y VESTIDORES PATASAGUA
CLIENTE: MUNICIPALIDAD DISTRITAL DE TIABAYA.

ITEM

DECRIPCION

As
As

N ELE

N VEC

LONG

1" (8)

3/4" (6)

5/8" (5)

1/2" (4)

3/8" (3)

Vert

3/8

10

0.3

35

4.93

345.10

Horz

3/8

3.1

0.3

12

13.00

312.00

Longitud (m)

0.00

0.00

0.00

0.00

Peso (Kg/m)

7.91

3.97

1.55

1.00

657.10
0.56

Peso (Kg)

0.00

0.00

0.00

0.00

367.98

TOTAL (Kg)
0.00
Varillas de 9.00m

0.00
-

0.00
-

0.00
-

80.31
-

80

DE METRADOS DE ACERO
VALORIZACION 02

PATASAGUA ALTO - TIABAYA".

1/4" (2)

COLUMNAS

0.00
0.25
0.00
2863.00
0.00
-

1/4" (2)

VIGAS

DE METRADOS DE ACERO
VALORIZACION 02

PATASAGUA ALTO - TIABAYA".

1/4" (2)

0.00
0.25
0.00
161.17
0.00
-

1/4" (2)

TECHO

0.00

0.00
0.25
0.00
137.28
0.00
-

1/4" (2)

MURO ARMADO

DE METRADOS DE ACERO
VALORIZACION 02

PATASAGUA ALTO - TIABAYA".

1/4" (2)

0.00
0.25
0.00
404.77
0.00
-

CLIENTE :

MUNICIPALIDAD DISTRITAL DE TIABAYA

OBRA :

MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

CONTRATISTA :

INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

INSPECTOR :

ING JOSE PAREDES AGUILAR

ZONA GEOGRAFICA :

04 AREQUIPA, MOQUEGUA Y TACNA

VERIFICACION DE LOS MONTOS SEGN LA FORMULA POLINOMICA


FORMULA POLINOMICA
COMPLEJO DEPORTIVO
FORMULA POLINOMICA
K = 0.014(Hr/Ho) + 0.037(Mr/Mo) + 0.083(Ar/Ao) + 0.099(Acr/Aco) + 0.130(Cr/Co) + 0.226(Ir/Io) + 0.411(MOr/MOo)
COSTO DIRECTO

1.000000
8.50%
5.00%

VALOR REFERECIAL CD X FR
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL

S/.

19.00%

I.G.V. :

S/.

720,989.97
720,989.97
61,284.15
36,049.50
818,323.62
155,481.49
973,805.11

PRECIOS A : Seti

SIMBOLO

IU

37

M
A

CONCEPTO

Verificacion del Monto


Indice
s/.

Set. 2010 (Base)


Indice
Incidencia

COEF.

INCIDENCIA

HERRAMIENTA MANUAL

0.014

100.00%

0.014

11,456.53

274.36

0.014

43

MADERA NACIONAL PARA ENCOF. Y CARPINT.

0.037

100.00%

0.037

30,277.97

536.05

0.037

AGREGADO FINO

0.083

100.00%

0.083

67,920.86

498.45

0.083

ACERO DE CONSTRUCCION CORRUGADO

0.099

100.00%

0.099

81,014.04

507.48

0.099

21

CEMENTO PORTLAND TIPO I

0.130

100.00%

0.130

106,382.07

423.60

0.130

39

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.226

100.00%

0.226

184,941.14

354.51

0.226

47

MANO DE OBRA INC. LEYES SOCIALES

0.411

100.00%

0.411

336,331.01

430.83

0.411

COEFICIENTE DE REAJUSTE ( K )

1.000

818,323.62

1.000

TOS SEGN LA FORMULA POLINOMICA


ULA POLINOMICA
LEJO DEPORTIVO

PRECIOS A : Setiembre 2,010


Feb-11
Indice Incidencia
284.36

0.015

558.01

0.039

530.20

0.088

573.48

0.112

423.60

0.130

357.41

0.228

427.68

0.408

1.020

1.020

CLIENTE :

MUNICIPALIDAD DISTRITAL DE TIABAYA

OBRA :

MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA - AREQUIPA

CONTRATISTA :

INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC

INSPECTOR :

ING JOSE PAREDES AGUILAR

ZONA GEOGRAFICA :

04 AREQUIPA, MOQUEGUA Y TACNA

VERIFICACION DE LOS MONTOS SEGN LA FORMULA POLINOMICA


FORMULA POLINOMICA
SERVICIOS HIGIENICOS Y VESTIDORES
FORMULA POLINOMICA
K = 0.013(Hr/Ho) + 0.044(AFr/AFo) + 0.051(Mr/Mo) + 0.085(ACr/ACo) + 0.096(Cr/Co) + 0.259(Alr/AIo) + 0.452(MOr/MOo)
COSTO DIRECTO

1.000000
8.50%
5.00%

VALOR REFERECIAL CD X FR
GASTOS GENERALES VARIABLES
UTILIDAD
SUB TOTAL

S/.

19.00%

I.G.V. :

S/.

140,770.57
140,770.57
11,965.50
7,038.53
159,774.60
30,357.17
190,131.77

PRECIOS A : Seti

SIMBOLO

IU

37

A
M

CONCEPTO

Verificacion del Monto


Indice
s/.

Set. 2010 (Base)


Indice
Incidencia

COEF.

INCIDENCIA

HERRAMIENTA MANUAL

0.013

100.00%

0.013

2,077.07

274.36

0.013

AGREGADO FINO

0.044

100.00%

0.044

7,030.08

498.45

0.044

43

MADERA IMPORTADA PARA ENCOF. Y CARPINT.

0.051

100.00%

0.051

8,148.50

536.05

0.051

ACERO DE CONSTRUCCION LISO

0.085

100.00%

0.085

13,580.84

512.17

0.085

21

CEMENTO PORTLAND TIPO I

0.096

100.00%

0.096

15,338.36

423.60

0.096

ALAMBRE Y CABLE TIPO TW Y THW

0.259

100.00%

0.259

41,381.62

560.09

0.259

47

MANO DE OBRA INC. LEYES SOCIALES

0.452

100.00%

0.452

72,218.12

430.83

0.452

COEFICIENTE DE REAJUSTE ( K )

1.000

159,774.60

1.000

TOS SEGN LA FORMULA POLINOMICA


ULA POLINOMICA
GIENICOS Y VESTIDORES

PRECIOS A : Setiembre 2,010


Feb-11
Indice Incidencia
284.36

0.013

530.20

0.047

558.01

0.053

578.78

0.096

423.60

0.096

672.79

0.311

427.68

0.449

1.065

1.065

CLCULO DEL FACTOR DE REAJUSTE (K)


COMPLEJO DEPORTIVO
VALORIZACION 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA AREQUIPA

CONTRATISTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC


: SETIEMBRE 2010
: MARZO 2011
: FEBRERO 2011

FECHA DE PRESUPUESTO BASE


FECHA DE REAJUSTE

INDICE DE PRECIOS REAJUSTE


K=

0.014(Hr/Ho) + 0.037(Mr/Mo) + 0.083(Ar/Ao) + 0.099(Acr/Aco) + 0.130(Cr/Co) + 0.226(Ir/Io) + 0.411(MOr/MOo)

SMBOLO

ELEMENTO

CDIGO

INCIDENC.

Set. 2010
(Base)

Feb-11
ndice

HERRAMIENTA MANUAL

37

0.014

100.000

274.36

284.36

0.015

MADERA NACIONAL PARA ENCOF. Y CARPINT.

43

0.037

100.000

536.05

558.01

0.039

AGREGADO FINO

04

0.083

100.000

498.45

530.20

0.088

ACERO DE CONSTRUCCION CORRUGADO

03

0.099

100.000

507.48

573.48

0.112

CEMENTO PORTLAND TIPO I

21

0.130

100.000

423.60

423.60

0.130

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

0.226

100.000

354.51

357.41

0.228

MANO DE OBRA INC. LEYES SOCIALES

47

0.411

100.000

430.83

427.68

0.408

FACTOR DE REAJUSTE K

1.000

1.020

CLCULO DEL FACTOR DE REAJUSTE (K)


SERVICIOS HIGIENICOS Y VESTIDORES
VALORIZACION 02
OBRA

: MEJORAMIENTO DEL COMPLEJO DEPORTIVO MUNICIPAL EN EL P.J. PATASAGUA ALTO, DISTRITO DE TIABAYA AREQUIPA

CONTRATISTA

: INGENIERIA, CONSULTORIA Y CONSTRUCCION SAC


: SETIEMBRE 2010
: MARZO 2011
: FEBRERO 2011

FECHA DE PRESUPUESTO BASE


FECHA DE REAJUSTE

INDICE DE PRECIOS REAJUSTE


K=

0.013(Hr/Ho) + 0.044(AFr/AFo) + 0.051(Mr/Mo) + 0.085(ACr/ACo) + 0.096(Cr/Co) + 0.259(Alr/AIo) + 0.452(MOr/MOo)

SMBOLO

ELEMENTO

CDIGO

INCIDENC.

Set. 2010
(Base)

Feb-11
ndice

HERRAMIENTA MANUAL

37

0.013

100.000

274.36

284.36

0.013

AGREGADO FINO

04

0.044

100.000

498.45

530.20

0.047

MADERA IMPORTADA PARA ENCOF. Y CARPINT.

43

0.051

100.000

536.05

558.01

0.053

ACERO DE CONSTRUCCION LISO

02

0.085

100.000

512.17

578.78

0.096

CEMENTO PORTLAND TIPO I

21

0.096

100.000

423.60

423.60

0.096

ALAMBRE Y CABLE TIPO TW Y THW

07

0.259

100.000

560.09

672.79

0.311

MANO DE OBRA INC. LEYES SOCIALES

47

0.452

100.000

430.83

427.68

0.449

FACTOR DE REAJUSTE K

1.000

1.065