CALENDARIO VALORIZADO DE AVANCE DE OBRA

Obra

MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I. E. JESUS NAZARENO N 1560 DEL C. P. SANTA VERONICA, DISTRITO DE LA ESPERANZA, PROVINCIA DE TRUJILLO - LA LIBERTAD

120
MES 01

001

ESTRUCTURAS

Item

Descripcin

01

OBRAS PROVISIONALES

01.01

TRANSPORTE DE EQUIPOS, HERRAMIENTAS Y MADERA

01.02

CARTEL DE OBRA DE 6.00 M x 3.60 M.

01.03

CASETA PARA ALMACEN Y GUARDIANIA

Und.

Metrado

Precio S/.

DIAS

MES 02

( Cuatro Meses)
MES 03

MES 04

Parcial S/.
3,473.34

glb

1.00

592.24

592.24

1.00

881.10

881.10

mes

4.00

500.00

2,000.00

296.12

296.12

881.10
2,000.00
02

TRABAJOS PRELIMINARES

2,878.94

02.01

TRAZO, NIVELACION Y REPLANTEO EN EDIFICACION

m2

1,772.57

0.89

1,577.59

02.02

APUNTALAMIENTO DE ESTRUCTURA METALICA EXISTENTE

glb

1.00

1,301.35

1,301.35

03

DEMOLICIONES

03.01

DESMONTAJE DE TECHOS DE ETERNIT - Incluye desmontaje de artefactos elctricos

m2

277.56

5.33

1,479.39

03.02

DESMONTAJE DE PUERTAS

11.00

28.23

310.53

03.03

DESMONTAJE DE VENTANAS BAJAS

18.00

28.23

508.14

03.04

DESMONTAJE DE VENTANAS ALTAS

5.00

18.82

94.10

03.05

DESMONTAJE DE APARATOS SANITARIOS

14.00

18.82

263.48

03.06

DEMOLICION Y ELIMINACION DE CONSTRUCCION EXISTENTE

m2

277.56

39.86

11,063.54

03.07

DEMOLICION DE PISOS Y VEREDAS EXISTENTES

m2

798.84

15.76

12,589.72

1,577.59
1,301.35
28,007.95

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
03.08

ELIMINACION DE MATERIAL EXCEDENTE DE DEMOLICIONES

m3

79.88

21.27

1,699.05

04

MOVIMIENTO DE TIERRAS

04.01

EXCAVACION DE ZANJAS PARA ZAPATAS

m3

89.66

27.02

2,422.61

04.02

EXCAVACION DE ZANJAS PARA CIMIENTOS

m3

200.94

27.02

5,429.40

04.03

EXCAVACION PARA CISTERNA

m3

16.85

30.88

520.33

04.04

EXCAVACION PARA JARDINERAS Y SARDINELES

m3

7.00

27.02

189.14

04.05

RELLENO COMPACTADO MANUAL EN ZONAS DE EXCAVACION, CON MATERIAL PROPIO

m3

141.58

18.45

2,612.15

04.06

NIVELACION INTERIOR Y APISONADO MANUAL PARA FALSO PISO

m2

483.43

3.04

1,469.63

04.07

ELIMINACION DE MATERIAL EXCEDENTE

m3

172.87

21.27

3,676.94

1,699.05
16,320.20

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

05

OBRAS DE CONCRETO SIMPLE

84,956.94

05.01

SOLADOS DE CONCRETO f'c=100 kg/cm2 h=0.10 m.

m2

73.40

18.23

1,338.08

05.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

m3

126.86

149.80

19,003.63

05.03

SOBRECIMIENTOS

1,338.08
19,003.63
26,567.61

05.03.01 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS

m3

30.41

209.51

6,371.20

05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS, HASTA 0.50 M

m2

349.71

29.51

10,319.94

05.04

CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4"

m2

483.43

20.43

9,876.47

05.05

PISOS Y PAVIMENTOS

6,371.20
10,319.94
9,876.47
38,047.62

05.05.01 PERFILADO, NIVELACION Y COMPACTACION DE SUB RASANTE PARA VEREDAS

m2

717.55

3.12

2,238.76

05.05.02 BASE GRANULAR EN AULAS EXTERIORES Y VEREDAS h=0.10 m

m2

717.55

8.72

6,257.04

05.05.03 PISO DE CONCRETO SIN COLOREAR, f'c=175 Kg/cm2 - ACABADO PULIDO - BRUADO CADA

m2

119.99

40.88

4,905.19

05.05.04 VEREDAS DE CONCRETO, f'c=175kg/cm2 h=0.10m ACABADO PULIDO Y BRUADO CADA 1.00

m2

176.00

41.25

7,260.00

05.05.05 PISOS DE C, ACABADO RUGOSO FROTACHADO PARA CERAMICA y/o PORCELANATO

m2

421.56

39.28

16,558.88

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
05.05.06 CURADO DE VEREDAS Y LOSAS CON CURADOR QUIMICO

m2

717.55

0.82

588.39

05.05.07 JUNTAS DE DILATACION EN VEREDAS Y LOSAS C/3m, CON MATERIAL ELASTICO

57.40

4.17

239.36

588.39
239.36
06

OBRAS DE CONCRETO ARMADO

06.01

ZAPATAS

208,056.75
16,457.43

06.01.01 ZAPATAS: CONCRETO f'c=210 kg/cm2

m3

38.42

305.22

11,726.55

06.01.02 ZAPATAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60

kg

1,126.40

4.20

4,730.88

11,726.55
4,730.88
06.02

VIGAS DE CIMENTACION

4,631.08

06.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2

m3

4.54

320.06

1,453.07

06.02.02 VIGAS DE CIMENTACION: ACERO DE REFUERZO Fy = 4200 Kg/cm2

kg

756.67

4.20

3,178.01

1,453.07
3,178.01
06.03

COLUMNAS

61,559.94

06.03.01 COLUMNAS: CONCRETO f'c=210 kg/cm2

m3

37.33

345.21

12,886.69

06.03.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL

m2

499.32

33.26

16,607.38

06.03.03 COLUMNAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60

kg

7,634.73

4.20

32,065.87

12,886.69
16,607.38
32,065.87
06.04

VIGAS

42,909.08

06.04.01 VIGAS: CONCRETO f'c=210kg/cm2

m3

30.51

321.31

9,803.17

06.04.02 VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL

m2

145.72

34.45

5,020.05

06.04.03 VIGAS: ACERO DE REFUERZO Fy = 4200 kg/cm2 GRADO 60

kg

6,687.11

4.20

28,085.86

3,921.27

5,881.90

2,008.02

3,012.03

11,234.34

16,851.52

06.05

LOSA ALIGERADA

57,474.09

06.05.01 LOSA ALIGERADA: CONCRETO f'c=210kg/cm2

m3

46.62

320.69

14,950.57

06.05.02 LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO NORMAL

m2

554.97

30.30

16,815.59

06.05.03 LOSA ALIGERADA: ACERO DE REFUERZO Fy = 4200 kg/cm2 GRADO 60

kg

3,798.98

4.20

15,955.72

06.05.04 BLOQUES HUECOS DE ARCILLA DE 0.30m x 0.30m x 0.15m


06.06

4,578.50

2.13

CISTERNA

5,980.23

8,970.34

6,726.24

10,089.35

6,382.29

9,573.43

3,900.88

5,851.33

9,752.21
5,316.14

06.06.01 CISTERNA: CONCRETO f'c=210kg/cm2

m3

7.18

362.66

2,603.90

06.06.02 CISTERNA: ENCOFRADO Y DESENCOFRADO NORMAL

m2

23.00

32.51

747.73

06.06.03 CISTERNA: ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60

kg

467.74

4.20

1,964.51

2,603.90
747.73
1,964.51
06.07

APOYOS DE T.E. y COBERTURA PATIO

7,345.32

06.07.01 APOYO T.E. CONCRETO f'c=210 kg/cm2

m3

5.28

350.88

1,852.65

06.07.02 APOYO T.E. ENCOFRADO Y DESENCOFRADO NORMAL

m2

52.93

30.08

1,592.13

06.07.03 APOYO T.E. ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60

kg

928.70

4.20

3,900.54

1,852.65
1,592.13
3,900.54
06.08

MESAS DE CONCRETO ARMADO

425.13

06.08.01 MESAS DE CA CONCRETO f'c=210 kg/cm2

m3

0.32

310.20

99.26

06.08.02 MESAS DE CA ENCOFRADO Y DESENCOFRADO NORMAL

m2

3.64

30.08

109.49

99.26
109.49
06.08.03 MESAS DE CA ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60

kg

51.52

4.20

216.38
216.38

06.09

JARDINERAS DE CONCRETO

5,745.21

06.09.01 JARDINERAS: CONCRETO f'c=175 kg/cm2

m3

8.94

293.67

2,625.41

06.09.02 JARDINERAS: ENCOFRADO Y DESENCOFRADO NORMAL

m2

48.11

38.81

1,867.15

06.09.03 JADINERAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2

kg

298.25

4.20

1,252.65

2,625.41
1,867.15
1,252.65
06.10

ESCENARIO

5,701.21

06.10.01 ESCENARIO: CONCRETO f'c=175 kg/cm2

m3

11.55

286.11

3,304.57

06.10.02 ESCENARIO: ENCOFRADO Y DESNCOFRADO NORMAL

m2

45.79

34.93

1,599.44

06.10.03 ESCENARIO: ACERO DE REFUERZO Fy = 4200 Kg/cm2

kg

189.81

4.20

797.20

3,304.57
1,599.44
797.20
06.11

CANALETA PARA AGUAS DE LLUVIA

492.12

06.11.01 CANALETA: CONCRETO f'c=210 Kg/cm2

m3

0.83

316.84

262.98

06.11.02 CANALETA: ENCOFRADO Y DESENCOFRADO NORMAL

m2

6.56

34.93

229.14

262.98
229.14
07

MUROS Y TABIQUES DE ALBAILERIA

34,283.63

07.01

MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18 HUECOS - APAREJO DE CABEZA

m2

211.29

67.67

14,297.99

07.02

MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18 HUECOS - APAREJO DE SOGA

m2

427.76

46.14

19,736.85

07.03

MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18 HUECOS - APAREJO DE CANTO

m2

6.82

36.48

248.79

14,297.99
19,736.85
248.79
TOTAL

377,977.75

47,451.47

201,929.25

128,300.91

296.12

CALENDARIO VALORIZADO DE AVANCE DE OBRA


MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I. E. JESUS NAZARENO N 1560 DEL C. P. SANTA VERONICA, DISTRITO DE LA ESPERANZA, PROVINCIA DE TRUJILLO - LA LIBERTAD

Obra

120
MES 01

002

ARQUITECTURA

Item

Descripcin

01

REVOQUES ENLUCIDOS Y MOLDURAS

01.01

TARRAJEO RAYADO, C:A = 1:4

m2

446.35

15.85

7,074.65

01.02

TARRAJEO EN MUROS Y COLUMNAS, C:A = 1:4

m2

1,427.13

19.56

27,914.66

01.03

TARRAJEO FROTACHADO EN JARDINERAS Y SARDINELES

m2

15.82

17.38

274.95

01.04

VESTIDURA DE DERRAMES CON MEZCLA C:A 1:4 E(min) = 1.5 cm

770.42

9.25

7,126.39

01.05

TARRAJEO CON IMPERMEABILIZANTES EN INTERIOR DE CISTERNA Y OTROS

m2

38.11

20.07

764.87

01.06

TARRAJEO EN APOYO T.E. y COBERTURA PATIO

m2

52.93

19.56

1,035.31

02

CIELORRASOS

02.01

CIELORRASOS CON MEZCLA C:A 1:4 - E(min) = 1.5 cm.

03

PISOS Y PAVIMENTOS

03.01

CONTRAPISO DE 50 mm

m2

628.03

17.43

10,946.56

03.02

PISOS DE CERAMICA COLOR ALTO TRANSITO, PEI = 5 FORMATO 0.50m x 0.50m

m2

699.61

47.58

33,287.44

03.03

PISOS DE PORCELANATO, COLOR, ALTO TRANSITO, PEI = 5, FORMATO 0.60m x 0.60m

m2

352.15

74.41

26,203.48

04

CONTRAZOCALOS

04.01

CONTRAZOCALO DE CEMENTO PULIDO EN EXTRIORES, SIN COLOREAR, H = 0.50 m,


E(MIN) = 1.5 cm.

104.75

11.37

1,191.01

04.02

CONTRAZOCALO DE CERAMICA EN INTERIORES, H = 0.20 m.

288.00

10.33

2,975.04

05

ZOCALOS

05.01

ZOCALO DE CERAMICA COLOR, ALTO TRANSITO, PEI = 5, FORMTO DE 0.30m x 0.30m.

06

REVESTIMIENTO DE GRADAS, ESCALERAS y OTROS

06.01

REVESTIMIENTO MESAS DE C A PORCELANATO ESMALTADO DE 60 x 60 cm.

m2

3.95

86.34

341.04

06.02

REVESTIMIENTO BORDES DE JARDINERAS Y SARDINELES CON GRANITO

32.45

81.64

2,649.22

06.03

REVESTIMIENTO DE GRADAS CON CERMICO

m2

19.43

57.14

1,110.23

Und.

Metrado

Precio S/.

DIAS

MES 02

( Cuatro Meses)
MES 03

MES 04

Parcial S/.
44,190.83

7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31
16,697.38
m2

625.37

26.70

16,697.38
16,697.38
70,437.48

10,946.56
11,650.60

21,636.84

9,171.22

17,032.26

4,166.05

1,191.01
2,975.04
21,496.22
m2

446.35

48.16

21,496.22
21,496.22
4,100.49

341.04
2,649.22

1,110.23
07
07.01

CARPINTERIA DE MADERA
PUERTAS EXTERIORES DE MADERA CEDRO NACIONAL, CON TABLEROS, Segn lo indicado en detalle
de planos

m2

76.55

390.84

61,050.59
29,918.80

07.02

PUERTAS INTERIORES ss hh DE MADERA CEDRO NACIONAL, CON TABLEROS, Segn lo indicado en


detalle de planos

m2

13.43

209.31

2,811.03

07.03

VENTANAS BAJAS DE MADERA CEDRO NACIONAL, CON SEGURIDAD, Segn lo indicado en los detalles y
planos

m2

116.61

197.32

23,009.49

07.04

VENTANAS ALTAS DE MADERA CEDRO NACIONAL, CON SEGURIDAD, Segn lo indicado en los detalles y
planos

m2

24.45

217.23

5,311.27

08
08.01

CARPINTERIA METALICA
PUERTA METALICA EN INGRESO PRINCIPAL

1.00

2,500.00

5,779.40
2,500.00

08.02

PUERTA METALICA EN INGRESO SECUNDARIO

1.00

850.00

850.00

08.03

BARRA PARA DISCAPACITADOS EN SS HH

4.00

98.60

394.40

08.04

BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn Diseo

glb

1.00

185.00

185.00

08.05

BARANDA DE PROTECCION EN ESCENARIO, Segn Diseo

glb

2.00

185.00

370.00

08.06

BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn Diseo

8.00

185.00

1,480.00

09
09.01

CERRAJERIA
CERRADURA PESADA DE SOBREPONER DE TRES GOLPES EN PUERTAS DE MADERA, CANTOL PESADA O SIMILAR

39.00

93.16

5,757.44
3,633.24

09.02

BISAGRA ALUMINIZADA PESADA DE 5" PARA PUERTAS DE MADERA

156.00

8.47

1,321.32

09.03

BISAGRA ALUMINIZADA PESADA DE 3" PARA PUERTAS EN SS HH (INODOROS)

39.00

7.67

299.13

09.04

JALADORES DE BRONCE DE 4" PARA PUERTAS DE MADERA

39.00

8.27

322.53

09.05

JALADORES DE BRONCE DE 3" PARA PUERTAS INTERIORES DE SS HH (INODOROS)

13.00

6.77

88.01

09.06

CERROJOS DE BRONCE PARA PUERTAS INTERIORES DE SS HH (Inodoros)

13.00

7.17

93.21

10
10.01

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS DOBLES NACIONALES

p2

1,213.12

6.53

9,800.54
7,921.67

10.02

ESPEJOS DE 6 mm CRISTAL IMPORTADO EN SS HH

p2

178.77

10.51

1,878.87

11
11.01

PINTURA
PINTURA EN MUROS Y COLUMNAS, LATEX DOS MANOS, Supermate de Vencedor o Similar

m2

1,628.88

9.54

46,195.84
15,539.52

11.02

PINTURA EN CIELORASOS Y VIGAS, LATEX DOS MANOS, Vencelatex de Vencedor o Similar

m2

625.37

8.96

5,603.32

11.03

PINTURA EN JARDINERAS y SARDINELES, OLEO DOS MANOS, Esmalte o Similar de primera


calidad.

m2

15.82

8.38

132.57

11.04

PINTURA EN PUERTAS CON BARNIZ MARINO, DOS MANOS

m2

179.96

33.79

6,080.85

11.05

PINTURA EN VENTANAS DE MADERA CON BARNIZ MARINO, DOS MANOS

m2

282.12

19.88

5,608.55

11.06

PINTURA EN ESTRUCTURAS METALICAS DE TECHO, DOS MANOS, CON ESMALTE o similar.

m2

390.50

26.76

10,449.78

11.07

PINTURA EN COBERTURA DE JUEGOS INFANTILES

m2

195.49

9.32

1,821.97

11.08

PINTURA EN BARANDAS METALICAS DE PROTECCION

9.40

11.01

103.49

11.09

PINTURA EN PUERTAS METALICAS, DOS MANOS, CON ESMALTE o similar.

m2

25.63

33.39

855.79

10,471.58

19,447.22

983.86

1,827.17

8,053.32

14,956.17

1,858.94

3,452.33

2,500.00
850.00
394.40
185.00
370.00
1,480.00

3,633.24
1,321.32
299.13
322.53
88.01
93.21

7,921.67
1,878.87

15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79

12

COBERTURA METALICA EN PATIO

7,688.77

12.01

TIJERALES ACERO CORRUGADO COBERTURA PATIO, Iguales a los existentes

2.00

1,250.00

2,500.00

12.02

CERCHA SECUNDARIA COBERTURA PATIO PRINCIPAL, Iguales a las Existentes

9.00

220.40

1,983.60

12.03

COBERTURA EN PATIO PRINCIPAL CON PLANCHAS DE CALAMINA, Iguales a las existentes

m2

66.55

27.66

1,840.77

12.04

SUSTITUCION DE PLANCHAS DETERIORADAS COBERTURA PATIO PRINCIPAL, Iguales a las ex m2

45.00

30.32

1,364.40

13

COBERTURA EN ZONA DE JUEGOS

13.01

EXCAVACION PARA DADOS ANCLAJE COLUMNAS DE TUBO DE ACERO

16.00

27.02

432.32

13.02

COLUMNAS DE TUBOS DE ACERO, Diametro = 6", Espesor = 3.5 mm, Altura = 5 m.

16.00

600.45

9,607.20

13.03

DADOS DE C f'c = 175 Kg/cm2 ANCLAJE DE COLUMNAS DE TUBO.

16.00

100.39

1,606.24

13.04

CERCHAS PRINCIPALES CON TUBOS DE ACERO DE 1", 3/4" y 1/2", Incluye colocacin y accesor

67.20

99.75

6,703.20

13.05

CERCHAS SECUNDARIAS CON TUBO DE ACERO, Diametro = 1/2", Espesor = 2.5 mm

219.38

67.07

14,713.82

13.06

COBERTURA DE POLICARBONATO TRASLUCUDO, Espesor = 6 mm , Color bronce

m2

207.27

41.82

8,668.03

14

GRAS SINTETICO

14.01

CORTE Y NIVELACION EN TERRENO NATURAL

m2

200.10

4.43

886.44

14.02

BASE COMPACTADA CON MATERIAL FILTRANTE SELECCIONADO PARA SUSTENTAR GRAS S m2

200.10

7.62

1,524.76

14.03

GRAS SINTETICO EN ZONA DE JUEGOS INFANTILES

200.10

104.14

20,838.41

15

JUEGOS INFANTILES

15.01

TROMPO SEGUN DISEO

1.00

1,250.00

1,250.00

15.02

SUBE Y BAJA SEGUN DISEO

1.00

1,400.00

1,400.00

15.03

COLUMPIOS SEGUN DISEO

1.00

1,500.00

1,500.00

15.04

TOBOGAN SEGUN DISEO

1.00

1,460.60

1,460.60

16

VARIOS

16.01

BASUREROS DE FIBRA DE VIDRIO, Segn modelo

2.00

660.00

1,320.00

16.02

REJILLA DE PERFILES DE ACERO PARA CANALETA DE AGUAS DE LLUVIA

9.00

125.00

1,125.00

16.03

JUNTAS DE CONSTRUCCION CON TEKNOPORT DE 1"

82.90

80.70

669.00

2,500.00
1,983.60
1,840.77
1,364.40
41,730.81

432.32
9,607.20
1,606.24
6,703.20
14,713.82
8,668.03
23,249.61

886.44
1,524.76
m2

20,838.41
5,610.60

1,250.00
1,400.00
1,500.00
1,460.60
3,114.00

1,320.00
1,125.00

TOTAL

371,066.05

468.30

200.70

1,233.17

121,581.22

248,251.66

CALENDARIO VALORIZADO DE AVANCE DE OBRA


MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I. E. JESUS NAZARENO N 1560 DEL C. P. SANTA VERONICA, DISTRITO DE LA ESPERANZA, PROVINCIA DE TRUJILLO - LA LIBERTAD

Obra

120
MES 01

003

INSTALACIONES SANITARIAS

Item

Descripcin

01

APARATOS Y ACCESORIOS SANITARIOS

01.01

INODORO TANQUE BAJO ADULTOS - COLOR

7.00

255.55

1,788.85

01.02

INODORO TANQUE BAJO NIOS - COLOR

12.00

245.55

2,946.60

01.03

LAVATORIOS CON PEDESTAL - COLOR

14.00

190.45

2,666.30

01.04

OVALINES DE COLOR EN MESAS DE C A

6.00

181.16

1,086.96

01.05

URINARIO DE LOZA ACADEMY - COLOR - PARA ADULTOS

2.00

181.04

362.08

01.06

PAPELERA DE LOZA DE COLOR DE 15 X 15 cm

pza

19.00

19.91

378.29

01.07

JABONERAS DE PARED DE POLICARBONATO

20.00

26.31

526.20

02

SISTEMA DE DESAGUE

02.01

SALIDAS DE DESAGUE PARA VENTILACION EN PVC

pto

11.00

48.25

530.75

02.02

SALIDA DE DESAGUE EN PVC DE 4"

pto

19.00

50.37

957.03

02.03

SALIDA DE DESAGUE EN PVC DE 2"

pto

22.00

43.79

963.38

02.04

TUBERIA DE PVC SAL 4"

49.30

8.19

403.77

02.05

TUBERIAS DE PVC SAL 6"

104.59

11.14

1,196.51

02.06

SUMIDERO CROMADO DE 2"

pza

15.00

27.76

416.40

02.07

REGISTRO CROMADO DE 4"

15.00

29.85

447.75

02.08

CAJA DE REGISTRO 12" x 24" CON MARCO Y TAPA

pza

9.00

94.77

852.93

02.09

EXCAVACION DE ZANJAS PARA TUBERIAS Y CAJAS DE DESAGUE

159.29

9.00

1,433.61

02.10

CAMA DE ARENA PARA ZANJAS DE TUBERIAS DE DESAGUE H=0.10 m.

153.89

2.82

433.97

02.11

RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS DE DESAGUE

153.89

10.74

1,652.78

Und.

Metrado

Precio S/.

DIAS

MES 02

( Cuatro Meses)
MES 03

MES 04

Parcial S/.
9,755.28

1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20
9,288.88

265.38

265.38
957.03
963.38
403.77
1,196.51
416.40
447.75
852.93
1,433.61
433.97
1,652.78

03

SISTEMA DE AGUA FRIA

8,752.81

03.01

SALIDA DE AGUA FRIA CON TUBERIA PVC- SAP C-10 DE1/2"

pto

49.00

44.04

2,157.96

03.02

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP - C-10

125.54

8.39

1,053.28

03.03

VALVULAS DE PASE Cim PESADA O SIMILAR DE 1/2"

pza

13.00

55.62

723.06

03.04

SUMINISTRO E INSTALACION DE SISTEMA DE IMPULSION

glb

1.00

340.23

340.23

03.05

SUMINISTRO E INSTALACION DE VALVULA FLOTADORA DE 1"

2.00

48.64

97.28

03.06

SUMINISTRO E INSTALACION DE TANQUE ELEVADO DE POLIETILENO CAP = 1,100 LITROS

1.00

469.68

469.68

03.07

SUMINISTRO E INSTALACION DE EQUIPO DE REBOSE Y LIMPIEZA

glb

1.00

255.82

255.82

03.08

EQUIPO DE BOMBEO DE AGUA CON ELECTROBOMBA Y ACCESORIOS

glb

1.00

1,177.34

1,177.34

03.09

EXCAVACION ZANJAS TUBERIA DE AGUA

125.54

9.00

1,129.86

03.10

RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS

125.54

10.74

1,348.30

04

CASETA PARA ELECTROBOMBA

04.01

CONCRETO f'c = 175 Kg/cm2

m3

0.75

283.72

212.79

04.02

ENCOFRADO Y DESENCOFRADO NORMAL PARA CASETAS

m2

3.96

30.08

119.12

04.03

ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60 PARA CASETAS

kg

36.80

4.25

156.40

04.04

TARRAJEO CON IMPERMEABILIZANTE PARA CASETAS DE ELECTROBOMBAS

m2

4.92

19.56

96.24

04.05

PINTURA DOS MANOS SELLADOR Y ESMALTE O SIMILAR EN CASETA

m2

4.92

5.12

25.19

04.06

REJA DE PROTECCION PARA CASETA ELECTROBOMBA, INCLUYE PINTADO, COLOCACION

glb

1.00

142.50

142.50

2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30
752.24

212.79
119.12
156.40
96.24
25.19
142.50
TOTAL

28,549.21

265.38

15,541.44

12,742.39

CALENDARIO VALORIZADO DE AVANCE DE OBRA


MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I. E. JESUS NAZARENO N 1560 DEL C. P. SANTA VERONICA, DISTRITO DE LA ESPERANZA, PROVINCIA DE TRUJILLO - LA LIBERTAD

Obra

120
MES 01

004

INSTALACIONES ELECTRICAS

Item

Descripcin

01

INSTALACIONES ELECTRICAS

01.01

SALIDAS EN TECHOS PARA CENTROS DE LUZ

pto

108.00

39.91

4,310.28

01.02

SALIDA DE PARED (BRAQUETES) CON PVC

pto

2.00

43.15

86.30

01.03

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

6.00

51.29

307.74

01.04

SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A TIERRA

pto

27.00

52.92

1,428.84

01.05

SALIDAS PARA LUZ DE EMERGENCIA EN PARED

pto

3.00

31.40

94.20

01.06

SALIDA PARA ELECTROBOMBA

pto

1.00

38.19

38.19

01.07

POZOS PUESTA A TIERRA PARA TABLEROS DE DISTRIBUCION

2.00

932.65

1,865.30

02

ARTEFACTOS Y LUMINARIAS

02.01

ARTEFACTO FLUORSCENTE 4 x 22 W Incluye Equipo y Pantalla

65.00

134.27

8,727.55

02.02

ARTEFACTO FLUORESCENTE 2 x 40 W Incluye Equipo y Pantalla

15.00

108.53

1,627.95

02.03

ARTFACTO FLUORESCENTE CIRCULAR DE 32 W PHILIPS O SIMILAR

28.00

53.31

1,492.68

02.04

BRAQUETE CON LUMINARIA AHORRADORA DE 42 W PHILIPS O SIMILAR

2.00

31.88

63.76

02.05

LUMINARIAS ISLA LED 70 W hm

3.00

4,654.10

13,962.30

02.06

LUMINARIA CIRCULAR DE 150 W, ADOSADO, INCLUYE PANTALLA Y EQUIPO, PHILIPS O SIMI

12.00

318.17

3,818.04

03

POSTES PARA LUMINARIAS

03.01

POSTES PARA LUMINARIAS ISLA LED 70 W hm DE ACERO ESTRUCTURAL: D = 4", Long = 6.50 u

Und.

Metrado

Precio S/.

DIAS

MES 02

( Cuatro Meses)
MES 03

MES 04

Parcial S/.
8,130.85

1,508.60

2,801.68

30.21

56.10

107.71

200.03

500.09

928.75

32.97

61.23
38.19
1,865.30

29,692.28

8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04
2,760.00
3.00

920.00

2,760.00
2,760.00

04

CONDUCTORES, CABLES Y DUCTOS

5,537.73

04.01

CABLE NYY 1 KV 2 x 25 mm2 + 1 x 6 mm2, Suministro e Instalacin

24.37

26.09

635.81

04.02

CABLE NYY 1 KV 2 x 16 mm2 x 1 x 6 mm2, Suministro e Instalacin

60.79

23.36

1,420.05

04.03

CABLE NYY 1 KV 2 x 6 mm2 + 1 x 6 mm2, Suministro e Instalacin

26.20

15.72

411.86

04.04

CAJA DE PASO METALICA DE 6" x 6" x 4" Con Tapa

11.00

20.72

227.92

04.05

CAJAS DE DISTRIBUCION F-1

1.00

269.79

269.79

04.06

CAJAS DE F G PARA MEDIDOR ELECTRICO

1.00

109.71

109.71

04.07

EXCAVACION DE ZANJAS PARA REDES ELECTRICAS, ANCHO = 0.40 m, PROF HASTA 0.80 m.

102.14

8.65

883.51

04.08

RELLENO ZANJAS CABLES ELECTRICOS CON LADRILLO Y CINTA DE SEGURIDAD

102.14

15.46

1,579.08

05

TABLEROS DE DISTRIBUCION

05.01

TABLERO GENERAL (T G) CON GABINETE METALICO

1.00

236.33

236.33

05.02

TABLERO DE DISTRIBUCION - GABINETE METALICO

6.00

318.43

1,910.58

05.03

TABLERO DE DISTRIBUCION PARA ELECTROBOMBA

1.00

154.67

154.67

635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08
2,301.58

236.33
1,910.58
154.67

TOTAL

48,422.44

2,179.58

11,489.00

34,753.86

001

ESTRUCTURAS

Item
01
01.01
01.02
01.03
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
05
05.01
05.02
05.03
05.03.01
05.03.02
05.04
05.05
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
05.05.06
05.05.07
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03

Descripcin
OBRAS PROVISIONALES
TRANSPORTE DE EQUIPOS, HERRAMIENTAS Y MADERA
CARTEL DE OBRA DE 6.00 M x 3.60 M.
CASETA PARA ALMACEN Y GUARDIANIA
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO EN EDIFICACION
APUNTALAMIENTO DE ESTRUCTURA METALICA
DEMOLICIONES
DESMONTAJE DE TECHOS DE ETERNIT - Incluye
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS BAJAS
DESMONTAJE DE VENTANAS ALTAS
DESMONTAJE DE APARATOS SANITARIOS
DEMOLICION Y ELIMINACION DE CONSTRUCCION
DEMOLICION DE PISOS Y VEREDAS EXISTENTES
ELIMINACION DE MATERIAL EXCEDENTE DE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
EXCAVACION PARA CISTERNA
EXCAVACION PARA JARDINERAS Y SARDINELES
RELLENO COMPACTADO MANUAL EN ZONAS DE
NIVELACION INTERIOR Y APISONADO MANUAL PARA
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADOS DE CONCRETO f'c=100 kg/cm2 h=0.10 m.
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTOSOBRECIMIENTOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORMAL PARA
CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTOPISOS Y PAVIMENTOS
PERFILADO, NIVELACION Y COMPACTACION DE SUB
BASE GRANULAR EN AULAS EXTERIORES Y VEREDAS
PISO DE CONCRETO SIN COLOREAR, f'c=175 Kg/cm2 - AC
VEREDAS DE CONCRETO, f'c=175kg/cm2 h=0.10m ACABAD
PISOS DE C, ACABADO RUGOSO FROTACHADO PARA CER
CURADO DE VEREDAS Y LOSAS CON CURADOR QUIMICO
JUNTAS DE DILATACION EN VEREDAS Y LOSAS C/3m,
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=210 kg/cm2
ZAPATAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2
VIGAS DE CIMENTACION: ACERO DE REFUERZO Fy = 4200
COLUMNAS

Und.

Metrado

Precio S/.

glb
u
mes

1.00
1.00
4.00

592.24
881.10
500.00

m2
glb

1,772.57
1.00

0.89
1,301.35

m2
u
u
u
u
m2
m2
m3

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

5.33
28.23
28.23
18.82
18.82
39.86
15.76
21.27

m3
m3
m3
m3
m3
m2
m3

89.66
200.94
16.85
7.00
141.58
483.43
172.87

27.02
27.02
30.88
27.02
18.45
3.04
21.27

m2
m3

73.40
126.86

18.23
149.80

m3
m2
m2

30.41
349.71
483.43

209.51
29.51
20.43

m2
m2
m2
m2
m2
m2
m

717.55
717.55
119.99
176.00
421.56
717.55
57.40

3.12
8.72
40.88
41.25
39.28
0.82
4.17

m3
kg

38.42
1,126.40

305.22
4.20

m3
kg

4.54
756.67

320.06
4.20

06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.05.04
06.06
06.06.01
06.06.02
06.06.03
06.07
06.07.01
06.07.02
06.07.03
06.08
06.08.01
06.08.02
06.08.03
06.09
06.09.01
06.09.02
06.09.03
06.10
06.10.01
06.10.02
06.10.03
06.11
06.11.01
06.11.02
07
07.01
07.02
07.03

COLUMNAS: CONCRETO f'c=210 kg/cm2


COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL
COLUMNAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2
VIGAS
VIGAS: CONCRETO f'c=210kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL
VIGAS: ACERO DE REFUERZO Fy = 4200 kg/cm2 GRADO 60
LOSA ALIGERADA
LOSA ALIGERADA: CONCRETO f'c=210kg/cm2
LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA: ACERO DE REFUERZO Fy = 4200
BLOQUES HUECOS DE ARCILLA DE 0.30m x 0.30m x 0.15m
CISTERNA
CISTERNA: CONCRETO f'c=210kg/cm2
CISTERNA: ENCOFRADO Y DESENCOFRADO NORMAL
CISTERNA: ACERO DE REFUERZO Fy = 4200 Kg/cm2
APOYOS DE T.E. y COBERTURA PATIO
APOYO T.E. CONCRETO f'c=210 kg/cm2
APOYO T.E. ENCOFRADO Y DESENCOFRADO NORMAL
APOYO T.E. ACERO DE REFUERZO Fy = 4200 Kg/cm2
MESAS DE CONCRETO ARMADO
MESAS DE CA CONCRETO f'c=210 kg/cm2
MESAS DE CA ENCOFRADO Y DESENCOFRADO
MESAS DE CA ACERO DE REFUERZO Fy = 4200 Kg/cm2
JARDINERAS DE CONCRETO
JARDINERAS: CONCRETO f'c=175 kg/cm2
JARDINERAS: ENCOFRADO Y DESENCOFRADO NORMAL
JADINERAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2
ESCENARIO
ESCENARIO: CONCRETO f'c=175 kg/cm2
ESCENARIO: ENCOFRADO Y DESNCOFRADO NORMAL
ESCENARIO: ACERO DE REFUERZO Fy = 4200 Kg/cm2
CANALETA PARA AGUAS DE LLUVIA
CANALETA: CONCRETO f'c=210 Kg/cm2
CANALETA: ENCOFRADO Y DESENCOFRADO NORMAL
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18

002

ARQUITECTURA

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
02
02.01
03
03.01
03.02

Descripcin
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO RAYADO, C:A = 1:4
TARRAJEO EN MUROS Y COLUMNAS, C:A = 1:4
TARRAJEO FROTACHADO EN JARDINERAS Y SARDINELES
VESTIDURA DE DERRAMES CON MEZCLA C:A 1:4 E(min)
TARRAJEO CON IMPERMEABILIZANTES EN INTERIOR DE
TARRAJEO EN APOYO T.E. y COBERTURA PATIO
CIELORRASOS
CIELORRASOS CON MEZCLA C:A 1:4 - E(min) = 1.5 cm.
PISOS Y PAVIMENTOS
CONTRAPISO DE 50 mm
PISOS DE CERAMICA COLOR ALTO TRANSITO, PEI = 5

m3
m2
kg

37.33
499.32
7,634.73

345.21
33.26
4.20

m3
m2
kg

30.51
145.72
6,687.11

321.31
34.45
4.20

m3
m2
kg
u

46.62
554.97
3,798.98
4,578.50

320.69
30.30
4.20
2.13

m3
m2
kg

7.18
23.00
467.74

362.66
32.51
4.20

m3
m2
kg

5.28
52.93
928.70

350.88
30.08
4.20

m3
m2
kg

0.32
3.64
51.52

310.20
30.08
4.20

m3
m2
kg

8.94
48.11
298.25

293.67
38.81
4.20

m3
m2
kg

11.55
45.79
189.81

286.11
34.93
4.20

m3
m2

0.83
6.56

316.84
34.93

m2
m2
m2

211.29
427.76
6.82

67.67
46.14
36.48

Und.

Metrado

Precio S/.

m2
m2
m2
m
m2
m2

446.35
1,427.13
15.82
770.42
38.11
52.93

15.85
19.56
17.38
9.25
20.07
19.56

m2

625.37

26.70

m2
m2

628.03
699.61

17.43
47.58

03.03
04
04.01
04.02
05
05.01
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
08
08.01
08.02
08.03
08.04
08.05
08.06
09
09.01
09.02
09.03
09.04
09.05
09.06
10
10.01
10.02
11
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
12
12.01
12.02
12.03
12.04
13
13.01
13.02
13.03
13.04
13.05

PISOS DE PORCELANATO, COLOR, ALTO TRANSITO, PEI =


CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO EN EXTRIORES,
CONTRAZOCALO DE CERAMICA EN INTERIORES, H = 0.20
ZOCALOS
ZOCALO DE CERAMICA COLOR, ALTO TRANSITO, PEI = 5,
REVESTIMIENTO DE GRADAS, ESCALERAS y OTROS
REVESTIMIENTO MESAS DE C A PORCELANATO
REVESTIMIENTO BORDES DE JARDINERAS Y
REVESTIMIENTO DE GRADAS CON CERMICO
CARPINTERIA DE MADERA

m2

352.15

74.41

m
m

104.75
288.00

11.37
10.33

m2

446.35

48.16

m2
m
m2

3.95
32.45
19.43

86.34
81.64
57.14

PUERTAS EXTERIORES DE MADERA CEDRO NACIONAL, CON


TABLEROS,
Segn lo indicado
en detalle
de planos
PUERTAS INTERIORES
ss hh DE
MADERA
CEDRO NACIONAL,
CON TABLEROS,
lo indicado
en detalle
de planos
VENTANAS
BAJASSegn
DE MADERA
CEDRO
NACIONAL,
CON
SEGURIDAD,
Segn
lo
indicado
en
los
detalles
y
planos
VENTANAS ALTAS DE MADERA CEDRO NACIONAL, CON
SEGURIDAD,
Segn
lo indicado en los detalles y planos
CARPINTERIA
METALICA

m2
m2
m2
m2

76.55
13.43
116.61
24.45

390.84
209.31
197.32
217.23

PUERTA METALICA EN INGRESO PRINCIPAL


PUERTA METALICA EN INGRESO SECUNDARIO
BARRA PARA DISCAPACITADOS EN SS HH
BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn
BARANDA DE PROTECCION EN ESCENARIO, Segn Diseo
BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn
CERRAJERIA

u
u
u
glb
glb
m

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
98.60
185.00
185.00
185.00

u
BISAGRA ALUMINIZADA PESADA DE 5" PARA PUERTAS DE
u
u
BISAGRA ALUMINIZADA PESADA DE 3" PARA PUERTAS EN
JALADORES DE BRONCE DE 4" PARA PUERTAS DE
u
JALADORES DE BRONCE DE 3" PARA PUERTAS
u
CERROJOS DE BRONCE PARA PUERTAS INTERIORES DE
u
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS DOBLES NACIONALES
p2
ESPEJOS DE 6 mm CRISTAL IMPORTADO EN SS HH
p2
PINTURA
PINTURA EN MUROS Y COLUMNAS, LATEX DOS MANOS, Superm m2
PINTURA EN CIELORASOS Y VIGAS, LATEX DOS MANOS,
m2
PINTURA EN JARDINERAS y SARDINELES, OLEO DOS
m2
m2
PINTURA EN PUERTAS CON BARNIZ MARINO, DOS
PINTURA EN VENTANAS DE MADERA CON BARNIZ
m2
PINTURA EN ESTRUCTURAS METALICAS DE TECHO, DOS MAN m2
PINTURA EN COBERTURA DE JUEGOS INFANTILES
m2
PINTURA EN BARANDAS METALICAS DE PROTECCION
m
PINTURA EN PUERTAS METALICAS, DOS MANOS, CON
m2
COBERTURA METALICA EN PATIO
TIJERALES ACERO CORRUGADO COBERTURA PATIO,
u
CERCHA SECUNDARIA COBERTURA PATIO PRINCIPAL,
u
COBERTURA EN PATIO PRINCIPAL CON PLANCHAS DE CALAMINAm2
SUSTITUCION DE PLANCHAS DETERIORADAS COBERTURA PATIOm2
COBERTURA EN ZONA DE JUEGOS
EXCAVACION PARA DADOS ANCLAJE COLUMNAS DE
u
COLUMNAS DE TUBOS DE ACERO, Diametro = 6", Espesor =
u
DADOS DE C f'c = 175 Kg/cm2 ANCLAJE DE COLUMNAS
u
CERCHAS PRINCIPALES CON TUBOS DE ACERO DE 1", 3/4" y 1/2 m
CERCHAS SECUNDARIAS CON TUBO DE ACERO, Diametro
m

39.00
156.00
39.00
39.00
13.00
13.00

93.16
8.47
7.67
8.27
6.77
7.17

1,213.12
178.77

6.53
10.51

1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63

9.54
8.96
8.38
33.79
19.88
26.76
9.32
11.01
33.39

2.00
9.00
66.55
45.00

1,250.00
220.40
27.66
30.32

16.00
16.00
16.00
67.20
219.38

27.02
600.45
100.39
99.75
67.07

CERRADURA PESADA DE SOBREPONER DE TRES GOLPES EN PUERTAS


DE MADERA, CANTOL PESADA O SIMILAR

13.06
14
14.01
14.02
14.03
15
15.01
15.02
15.03
15.04
16
16.01
16.02
16.03

COBERTURA DE POLICARBONATO TRASLUCUDO, Espesor


GRAS SINTETICO
CORTE Y NIVELACION EN TERRENO NATURAL
BASE COMPACTADA CON MATERIAL FILTRANTE SELECCIO
GRAS SINTETICO EN ZONA DE JUEGOS INFANTILES
JUEGOS INFANTILES
TROMPO SEGUN DISEO
SUBE Y BAJA SEGUN DISEO
COLUMPIOS SEGUN DISEO
TOBOGAN SEGUN DISEO
VARIOS
BASUREROS DE FIBRA DE VIDRIO, Segn modelo
REJILLA DE PERFILES DE ACERO PARA CANALETA DE
JUNTAS DE CONSTRUCCION CON TEKNOPORT DE 1"

003

INSTALACIONES SANITARIAS

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
02.11
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
04
04.01
04.02
04.03
04.04
04.05

Descripcin
APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE BAJO ADULTOS - COLOR
INODORO TANQUE BAJO NIOS - COLOR
LAVATORIOS CON PEDESTAL - COLOR
OVALINES DE COLOR EN MESAS DE C A
URINARIO DE LOZA ACADEMY - COLOR - PARA ADULTOS
PAPELERA DE LOZA DE COLOR DE 15 X 15 cm
JABONERAS DE PARED DE POLICARBONATO
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE PARA VENTILACION EN PVC
SALIDA DE DESAGUE EN PVC DE 4"
SALIDA DE DESAGUE EN PVC DE 2"
TUBERIA DE PVC SAL 4"
TUBERIAS DE PVC SAL 6"
SUMIDERO CROMADO DE 2"
REGISTRO CROMADO DE 4"
CAJA DE REGISTRO 12" x 24" CON MARCO Y TAPA
EXCAVACION DE ZANJAS PARA TUBERIAS Y CAJAS DE
CAMA DE ARENA PARA ZANJAS DE TUBERIAS DE
DESAGUE COMPACTADO
H=0.10 m.
RELLENO
CON MATERIAL PROPIO EN
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA PVC- SAP C-10
RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP - C-10
VALVULAS DE PASE Cim PESADA O SIMILAR DE 1/2"
SUMINISTRO E INSTALACION DE SISTEMA DE IMPULSION
SUMINISTRO E INSTALACION DE VALVULA FLOTADORA
SUMINISTRO E INSTALACION DE TANQUE ELEVADO DE POL
SUMINISTRO E INSTALACION DE EQUIPO DE REBOSE Y
EQUIPO DE BOMBEO DE AGUA CON ELECTROBOMBA Y
EXCAVACION ZANJAS TUBERIA DE AGUA
RELLENO COMPACTADO CON MATERIAL PROPIO EN
CASETA PARA ELECTROBOMBA
CONCRETO f'c = 175 Kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL PARA CASETAS
ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60 PARA
TARRAJEO CON IMPERMEABILIZANTE PARA CASETAS DE
PINTURA DOS MANOS SELLADOR Y ESMALTE O SIMILAR

m2

207.27

41.82

m2
m2
m2

200.10
200.10
200.10

4.43
7.62
104.14

u
u
u
u

1.00
1.00
1.00
1.00

1,250.00
1,400.00
1,500.00
1,460.60

u
m
m

2.00
9.00
82.90

660.00
125.00
80.70

Und.

Metrado

Precio S/.

u
u
u
u
u
pza
u

7.00
12.00
14.00
6.00
2.00
19.00
20.00

255.55
245.55
190.45
181.16
181.04
19.91
26.31

pto
pto
pto
m
m
pza
u
pza
m
m
m

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

48.25
50.37
43.79
8.19
11.14
27.76
29.85
94.77
9.00
2.82
10.74

pto
m
pza
glb
u
u
glb
glb
m
m

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

44.04
8.39
55.62
340.23
48.64
469.68
255.82
1,177.34
9.00
10.74

m3
m2
kg
m2
m2

0.75
3.96
36.80
4.92
4.92

283.72
30.08
4.25
19.56
5.12

04.06

REJA DE PROTECCION PARA CASETA ELECTROBOMBA, IN

004

INSTALACIONES ELECTRICAS

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
05
05.01
05.02
05.03

Descripcin
Und.
INSTALACIONES ELECTRICAS
SALIDAS EN TECHOS PARA CENTROS DE LUZ
pto
SALIDA DE PARED (BRAQUETES) CON PVC
pto
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON
pto
SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A
pto
SALIDAS PARA LUZ DE EMERGENCIA EN PARED
pto
SALIDA PARA ELECTROBOMBA
pto
POZOS PUESTA A TIERRA PARA TABLEROS DE
u
ARTEFACTOS Y LUMINARIAS
ARTEFACTO FLUORSCENTE 4 x 22 W Incluye Equipo y
u
ARTEFACTO FLUORESCENTE 2 x 40 W Incluye Equipo y
u
ARTFACTO FLUORESCENTE CIRCULAR DE 32 W PHILIPS
u
BRAQUETE CON LUMINARIA AHORRADORA DE 42 W
u
LUMINARIAS ISLA LED 70 W hm
u
LUMINARIA CIRCULAR DE 150 W, ADOSADO, INCLUYE PANTA
u
POSTES PARA LUMINARIAS
POSTES PARA LUMINARIAS ISLA LED 70 W hm DE ACERO ESTRU u
CONDUCTORES, CABLES Y DUCTOS
CABLE NYY 1 KV 2 x 25 mm2 + 1 x 6 mm2, Suministro e
m
CABLE NYY 1 KV 2 x 16 mm2 x 1 x 6 mm2, Suministro e
m
CABLE NYY 1 KV 2 x 6 mm2 + 1 x 6 mm2, Suministro e
m
CAJA DE PASO METALICA DE 6" x 6" x 4" Con Tapa
u
CAJAS DE DISTRIBUCION F-1
u
CAJAS DE F G PARA MEDIDOR ELECTRICO
u
EXCAVACION DE ZANJAS PARA REDES ELECTRICAS, ANCHO
m
RELLENO ZANJAS CABLES ELECTRICOS CON LADRILLO Y
m
TABLEROS DE DISTRIBUCION
TABLERO GENERAL (T G) CON GABINETE METALICO
u
TABLERO DE DISTRIBUCION - GABINETE METALICO
u
TABLERO DE DISTRIBUCION PARA ELECTROBOMBA
u

Total costo directo


Gastos generales fijos
Gastos generales variables
Utilidad

Sub Total
IGV

Total
Porcentaje de Avance

glb

1.00
Metrado

142.50
Precio S/.

108.00
2.00
6.00
27.00
3.00
1.00
2.00

39.91
43.15
51.29
52.92
31.40
38.19
932.65

65.00
15.00
28.00
2.00
3.00
12.00

134.27
108.53
53.31
31.88
4,654.10
318.17

3.00

920.00

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

26.09
23.36
15.72
20.72
269.79
109.71
8.65
15.46

1.00
6.00
1.00

236.33
318.43
154.67

VALORIZACION AL 25%
ANTERIOR
METRADO

VALORIZADO
(S/.)

ACTUAL
METRADO

ACUMULADO

VALORIZADO
(S/.)

METRADO

165,203.08
Parcial S/.
3,473.34
592.24
881.10
2,000.00
2,878.94
1,577.59
1,301.35
28,007.95
1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05
16,320.20
2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94
84,956.94
1,338.08
19,003.63
26,567.61
6,371.20
10,319.94
9,876.47
38,047.62
2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36
208,056.75
16,457.43
11,726.55
4,730.88
4,631.08
1,453.07
3,178.01
61,559.94

VALORIZADO
(S/.)

165,203.08

1.00
1.00
4.00

592.24
881.10
2,000.00

1.00
1.00
4.00

592.24
881.10
2,000.00

100%
100%
100%

1,772.57
1.00

1,577.59
1,301.35

1,772.57
1.00

1,577.59
1,301.35

100%
100%

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05

100%
100%
100%
100%
100%
100%
100%
100%

89.66
200.94
16.85
7.00
141.58
483.43
172.87

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

89.66
200.94
16.85
7.00
141.58
483.43
172.87

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

100%
100%
100%
100%
100%
100%
100%

73.40
126.86

1,338.08
19,003.63

73.40
126.86

1,338.08
19,003.63

100%
100%

30.41
349.71
483.43

6,371.20
10,319.94
9,876.47

30.41
349.71
483.43

6,371.20
10,319.94
9,876.47

100%
100%
100%

717.55
717.55
119.99
176.00
421.56
717.55
57.40

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36

717.55
717.55
119.99
176.00
421.56
717.55
57.40

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36

100%
100%
100%
100%
100%
100%
100%

38.42
1,126.40

11,726.55
4,730.88

38.42
1,126.40

11,726.55
4,730.88

100%
100%

4.54
756.67

1,453.07
3,178.01

4.54
756.67

1,453.07
3,178.01

100%
100%

12,886.69
16,607.38
32,065.87
42,909.08
9,803.17
5,020.05
28,085.86
57,474.09
14,950.57
16,815.59
15,955.72
9,752.21
5,316.14
2,603.90
747.73
1,964.51
7,345.32
1,852.65
1,592.13
3,900.54
425.13
99.26
109.49
216.38
5,745.21
2,625.41
1,867.15
1,252.65
5,701.21
3,304.57
1,599.44
797.20
492.12
262.98
229.14
34,283.63
14,297.99
19,736.85
248.79

0.00
0.00
2,018.38

0.00
0.00
8,477.20

0.00
0.00
2,018.38

0.00
0.00
8,477.20

0%
0%
26%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
Parcial S/.
44,190.83
7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31
16,697.38
16,697.38
70,437.48
10,946.56
33,287.44

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00

0.00

0.00

0.00

0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0%
0%

26,203.48
4,166.05
1,191.01
2,975.04
21,496.22
21,496.22
4,100.49
341.04
2,649.22
1,110.23
61,050.59
29,918.80
2,811.03
23,009.49
5,311.27
5,779.40
2,500.00
850.00
394.40
185.00
370.00
1,480.00
5,757.44
3,633.24
1,321.32
299.13
322.53
88.01
93.21
9,800.54
7,921.67
1,878.87
46,195.84
15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79
7,688.77
2,500.00
1,983.60
1,840.77
1,364.40
41,730.81
432.32
9,607.20
1,606.24
6,703.20
14,713.82

0.00

0.00

0.00

0.00

0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0%
0%

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%

8,668.03
23,249.61
886.44
1,524.76
20,838.41
5,610.60
1,250.00
1,400.00
1,500.00
1,460.60
3,114.00
1,320.00
1,125.00
669.00

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
Parcial S/.
9,755.28
1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20
9,288.88
530.75
957.03
963.38
403.77
1,196.51
416.40
447.75
852.93
1,433.61
433.97
1,652.78
8,752.81
2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30
752.24
212.79
119.12
156.40
96.24
25.19

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%

142.50

0.00

0.00

0.00

0.00
Parcial S/.
8,130.85
4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30
29,692.28
8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04
2,760.00
2,760.00
5,537.73
635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08
2,301.58
236.33
1,910.58
154.67

0.00

0%

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

###

165,203.08

165,203.08

41,300.77
41,300.77
41,300.77
949,917.77
170,985.20
1,120,902.97

8,260.15
8,260.15
8,260.15
189,983.55
34,197.04
224,180.58
20%

8,260.15
8,260.15
8,260.15
189,983.55
34,197.04
224,180.58
20%

SALDO
METRADO

VALORIZADO
(S/.)

212,774.67
0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00

0.00
0.00

0%
0%

37.33
499.32
5,616.35

12,886.69
16,607.38
23,588.67

100%
100%
74%

30.51
145.72
6,687.11

9,803.17
5,020.05
28,085.86

100%
100%
100%

46.62
554.97
3,798.98
4,578.50

14,950.57
16,815.59
15,955.72
9,752.21

100%
100%
100%
100%

7.18
23.00
467.74

2,603.90
747.73
1,964.51

100%
100%
100%

5.28
52.93
928.70

1,852.65
1,592.13
3,900.54

100%
100%
100%

0.32
3.64
51.52

99.26
109.49
216.38

100%
100%
100%

8.94
48.11
298.25

2,625.41
1,867.15
1,252.65

100%
100%
100%

11.55
45.79
189.81

3,304.57
1,599.44
797.20

100%
100%
100%

0.83
6.56

262.98
229.14

100%
100%

211.29
427.76
6.82

14,297.99
19,736.85
248.79

100%
100%
100%

371,066.05
446.35
1,427.13
15.82
770.42
38.11
52.93

7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31

100%
100%
100%
100%
100%
100%

625.37

16,697.38

100%

628.03
699.61

10,946.56
33,287.44

100%
100%

352.15

26,203.48

100%

104.75
288.00

1,191.01
2,975.04

100%
100%

446.35

21,496.22

100%

3.95
32.45
19.43

341.04
2,649.22
1,110.23

100%
100%
100%

76.55
13.43
116.61
24.45

29,918.80
2,811.03
23,009.49
5,311.27

100%
100%
100%
100%

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
394.40
185.00
370.00
1,480.00

100%
100%
100%
100%
100%
100%

39.00
156.00
39.00
39.00
13.00
13.00

3,633.24
1,321.32
299.13
322.53
88.01
93.21

100%
100%
100%
100%
100%
100%

1,213.12
178.77

7,921.67
1,878.87

100%
100%

1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63

15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79

100%
100%
100%
100%
100%
100%
100%
100%
100%

2.00
9.00
66.55
45.00

2,500.00
1,983.60
1,840.77
1,364.40

100%
100%
100%
100%

16.00
16.00
16.00
67.20
219.38

432.32
9,607.20
1,606.24
6,703.20
14,713.82

100%
100%
100%
100%
100%

207.27

8,668.03

100%

200.10
200.10
200.10

886.44
1,524.76
20,838.41

100%
100%
100%

1.00
1.00
1.00
1.00

1,250.00
1,400.00
1,500.00
1,460.60

100%
100%
100%
100%

2.00
9.00
82.90

1,320.00
1,125.00
669.00

100%
100%
100%

28,549.21
7.00
12.00
14.00
6.00
2.00
19.00
20.00

1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20

100%
100%
100%
100%
100%
100%
100%

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

530.75
957.03
963.38
403.77
1,196.51
416.40
447.75
852.93
1,433.61
433.97
1,652.78

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.75
3.96
36.80
4.92
4.92

212.79
119.12
156.40
96.24
25.19

100%
100%
100%
100%
100%

1.00

142.50

100%

48,422.44
108.00
2.00
6.00
27.00
3.00
1.00
2.00

4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30

100%
100%
100%
100%
100%
100%
100%

65.00
15.00
28.00
2.00
3.00
12.00

8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04

100%
100%
100%
100%
100%
100%

3.00

2,760.00

100%

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08

100%
100%
100%
100%
100%
100%
100%
100%

1.00
6.00
1.00

236.33
1,910.58
154.67

100%
100%
100%

660,812.37
33,040.62
33,040.62
33,040.62
759,934.22
136,788.16
896,722.38
80%

001

ESTRUCTURAS

Item
01
01.01
01.02
01.03
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
05
05.01
05.02
05.03
05.03.01
05.03.02
05.04
05.05
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
05.05.06
05.05.07
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03

Descripcin
OBRAS PROVISIONALES
TRANSPORTE DE EQUIPOS, HERRAMIENTAS Y MADERA
CARTEL DE OBRA DE 6.00 M x 3.60 M.
CASETA PARA ALMACEN Y GUARDIANIA
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO EN EDIFICACION
APUNTALAMIENTO DE ESTRUCTURA METALICA
DEMOLICIONES
DESMONTAJE DE TECHOS DE ETERNIT - Incluye
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS BAJAS
DESMONTAJE DE VENTANAS ALTAS
DESMONTAJE DE APARATOS SANITARIOS
DEMOLICION Y ELIMINACION DE CONSTRUCCION
DEMOLICION DE PISOS Y VEREDAS EXISTENTES
ELIMINACION DE MATERIAL EXCEDENTE DE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
EXCAVACION PARA CISTERNA
EXCAVACION PARA JARDINERAS Y SARDINELES
RELLENO COMPACTADO MANUAL EN ZONAS DE
NIVELACION INTERIOR Y APISONADO MANUAL PARA
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADOS DE CONCRETO f'c=100 kg/cm2 h=0.10 m.
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTOSOBRECIMIENTOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORMAL PARA
CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTOPISOS Y PAVIMENTOS
PERFILADO, NIVELACION Y COMPACTACION DE SUB
BASE GRANULAR EN AULAS EXTERIORES Y VEREDAS
PISO DE CONCRETO SIN COLOREAR, f'c=175 Kg/cm2 - AC
VEREDAS DE CONCRETO, f'c=175kg/cm2 h=0.10m ACABAD
PISOS DE C, ACABADO RUGOSO FROTACHADO PARA CER
CURADO DE VEREDAS Y LOSAS CON CURADOR QUIMICO
JUNTAS DE DILATACION EN VEREDAS Y LOSAS C/3m, CON
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=210 kg/cm2
ZAPATAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2
VIGAS DE CIMENTACION: ACERO DE REFUERZO Fy = 4200
COLUMNAS

Und.

Metrado

Precio S/.

glb
u
mes

1.00
1.00
4.00

592.24
881.10
500.00

m2
glb

1,772.57
1.00

0.89
1,301.35

m2
u
u
u
u
m2
m2
m3

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

5.33
28.23
28.23
18.82
18.82
39.86
15.76
21.27

m3
m3
m3
m3
m3
m2
m3

89.66
200.94
16.85
7.00
141.58
483.43
172.87

27.02
27.02
30.88
27.02
18.45
3.04
21.27

m2
m3

73.40
126.86

18.23
149.80

m3
m2
m2

30.41
349.71
483.43

209.51
29.51
20.43

m2
m2
m2
m2
m2
m2
m

717.55
717.55
119.99
176.00
421.56
717.55
57.40

3.12
8.72
40.88
41.25
39.28
0.82
4.17

m3
kg

38.42
1,126.40

305.22
4.20

m3
kg

4.54
756.67

320.06
4.20

06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.05.04
06.06
06.06.01
06.06.02
06.06.03
06.07
06.07.01
06.07.02
06.07.03
06.08
06.08.01
06.08.02
06.08.03
06.09
06.09.01
06.09.02
06.09.03
06.10
06.10.01
06.10.02
06.10.03
06.11
06.11.01
06.11.02
07
07.01
07.02
07.03

COLUMNAS: CONCRETO f'c=210 kg/cm2


COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL
COLUMNAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2
VIGAS
VIGAS: CONCRETO f'c=210kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL
VIGAS: ACERO DE REFUERZO Fy = 4200 kg/cm2 GRADO 60
LOSA ALIGERADA
LOSA ALIGERADA: CONCRETO f'c=210kg/cm2
LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA: ACERO DE REFUERZO Fy = 4200 kg/cm2
BLOQUES HUECOS DE ARCILLA DE 0.30m x 0.30m x 0.15m
CISTERNA
CISTERNA: CONCRETO f'c=210kg/cm2
CISTERNA: ENCOFRADO Y DESENCOFRADO NORMAL
CISTERNA: ACERO DE REFUERZO Fy = 4200 Kg/cm2
APOYOS DE T.E. y COBERTURA PATIO
APOYO T.E. CONCRETO f'c=210 kg/cm2
APOYO T.E. ENCOFRADO Y DESENCOFRADO NORMAL
APOYO T.E. ACERO DE REFUERZO Fy = 4200 Kg/cm2
MESAS DE CONCRETO ARMADO
MESAS DE CA CONCRETO f'c=210 kg/cm2
MESAS DE CA ENCOFRADO Y DESENCOFRADO
MESAS DE CA ACERO DE REFUERZO Fy = 4200 Kg/cm2
JARDINERAS DE CONCRETO
JARDINERAS: CONCRETO f'c=175 kg/cm2
JARDINERAS: ENCOFRADO Y DESENCOFRADO NORMAL
JADINERAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2
ESCENARIO
ESCENARIO: CONCRETO f'c=175 kg/cm2
ESCENARIO: ENCOFRADO Y DESNCOFRADO NORMAL
ESCENARIO: ACERO DE REFUERZO Fy = 4200 Kg/cm2
CANALETA PARA AGUAS DE LLUVIA
CANALETA: CONCRETO f'c=210 Kg/cm2
CANALETA: ENCOFRADO Y DESENCOFRADO NORMAL
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18

002

ARQUITECTURA

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
02
02.01
03
03.01
03.02

Descripcin
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO RAYADO, C:A = 1:4
TARRAJEO EN MUROS Y COLUMNAS, C:A = 1:4
TARRAJEO FROTACHADO EN JARDINERAS Y SARDINELES
VESTIDURA DE DERRAMES CON MEZCLA C:A 1:4 E(min)
TARRAJEO CON IMPERMEABILIZANTES EN INTERIOR DE
TARRAJEO EN APOYO T.E. y COBERTURA PATIO
CIELORRASOS
CIELORRASOS CON MEZCLA C:A 1:4 - E(min) = 1.5 cm.
PISOS Y PAVIMENTOS
CONTRAPISO DE 50 mm
PISOS DE CERAMICA COLOR ALTO TRANSITO, PEI = 5

m3
m2
kg

37.33
499.32
7,634.73

345.21
33.26
4.20

m3
m2
kg

30.51
145.72
6,687.11

321.31
34.45
4.20

m3
m2
kg
u

46.62
554.97
3,798.98
4,578.50

320.69
30.30
4.20
2.13

m3
m2
kg

7.18
23.00
467.74

362.66
32.51
4.20

m3
m2
kg

5.28
52.93
928.70

350.88
30.08
4.20

m3
m2
kg

0.32
3.64
51.52

310.20
30.08
4.20

m3
m2
kg

8.94
48.11
298.25

293.67
38.81
4.20

m3
m2
kg

11.55
45.79
189.81

286.11
34.93
4.20

m3
m2

0.83
6.56

316.84
34.93

m2
m2
m2

211.29
427.76
6.82

67.67
46.14
36.48

Und.

Metrado

Precio S/.

m2
m2
m2
m
m2
m2

446.35
1,427.13
15.82
770.42
38.11
52.93

15.85
19.56
17.38
9.25
20.07
19.56

m2

625.37

26.70

m2
m2

628.03
699.61

17.43
47.58

03.03
04
04.01
04.02
05
05.01
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
08
08.01
08.02
08.03
08.04
08.05
08.06
09
09.01
09.02
09.03
09.04
09.05
09.06
10
10.01
10.02
11
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
12
12.01
12.02
12.03
12.04
13
13.01
13.02
13.03
13.04
13.05

PISOS DE PORCELANATO, COLOR, ALTO TRANSITO, PEI =


CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO EN EXTRIORES,
CONTRAZOCALO DE CERAMICA EN INTERIORES, H = 0.20
ZOCALOS
ZOCALO DE CERAMICA COLOR, ALTO TRANSITO, PEI = 5,
REVESTIMIENTO DE GRADAS, ESCALERAS y OTROS
REVESTIMIENTO MESAS DE C A PORCELANATO
REVESTIMIENTO BORDES DE JARDINERAS Y
REVESTIMIENTO DE GRADAS CON CERMICO
CARPINTERIA DE MADERA

m2

352.15

74.41

m
m

104.75
288.00

11.37
10.33

m2

446.35

48.16

m2
m
m2

3.95
32.45
19.43

86.34
81.64
57.14

PUERTAS EXTERIORES DE MADERA CEDRO NACIONAL, CON


TABLEROS,
Segn lo indicado
en detalle
de planos
PUERTAS INTERIORES
ss hh DE
MADERA
CEDRO NACIONAL,
CON TABLEROS,
lo indicado
en detalle
de planos
VENTANAS
BAJASSegn
DE MADERA
CEDRO
NACIONAL,
CON
SEGURIDAD,
Segn
lo
indicado
en
los
detalles
y
planos
VENTANAS ALTAS DE MADERA CEDRO NACIONAL, CON
SEGURIDAD,
Segn
lo indicado en los detalles y planos
CARPINTERIA
METALICA

m2
m2
m2
m2

76.55
13.43
116.61
24.45

390.84
209.31
197.32
217.23

PUERTA METALICA EN INGRESO PRINCIPAL


PUERTA METALICA EN INGRESO SECUNDARIO
BARRA PARA DISCAPACITADOS EN SS HH
BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn
BARANDA DE PROTECCION EN ESCENARIO, Segn Diseo
BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn
CERRAJERIA

u
u
u
glb
glb
m

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
98.60
185.00
185.00
185.00

u
BISAGRA ALUMINIZADA PESADA DE 5" PARA PUERTAS DE
u
u
BISAGRA ALUMINIZADA PESADA DE 3" PARA PUERTAS EN
JALADORES DE BRONCE DE 4" PARA PUERTAS DE
u
JALADORES DE BRONCE DE 3" PARA PUERTAS
u
CERROJOS DE BRONCE PARA PUERTAS INTERIORES DE
u
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS DOBLES NACIONALES
p2
ESPEJOS DE 6 mm CRISTAL IMPORTADO EN SS HH
p2
PINTURA
PINTURA EN MUROS Y COLUMNAS, LATEX DOS MANOS, Superm m2
PINTURA EN CIELORASOS Y VIGAS, LATEX DOS MANOS,
m2
PINTURA EN JARDINERAS y SARDINELES, OLEO DOS
m2
PINTURA EN PUERTAS CON BARNIZ MARINO, DOS MANOS
m2
PINTURA EN VENTANAS DE MADERA CON BARNIZ
m2
PINTURA EN ESTRUCTURAS METALICAS DE TECHO, DOS MAN m2
PINTURA EN COBERTURA DE JUEGOS INFANTILES
m2
PINTURA EN BARANDAS METALICAS DE PROTECCION
m
PINTURA EN PUERTAS METALICAS, DOS MANOS, CON
m2
COBERTURA METALICA EN PATIO
TIJERALES ACERO CORRUGADO COBERTURA PATIO,
u
CERCHA SECUNDARIA COBERTURA PATIO PRINCIPAL,
u
COBERTURA EN PATIO PRINCIPAL CON PLANCHAS DE CALAMINAm2
SUSTITUCION DE PLANCHAS DETERIORADAS COBERTURA PATIOm2
COBERTURA EN ZONA DE JUEGOS
EXCAVACION PARA DADOS ANCLAJE COLUMNAS DE
u
COLUMNAS DE TUBOS DE ACERO, Diametro = 6", Espesor =
u
DADOS DE C f'c = 175 Kg/cm2 ANCLAJE DE COLUMNAS DE
u
CERCHAS PRINCIPALES CON TUBOS DE ACERO DE 1", 3/4" y 1/2 m
CERCHAS SECUNDARIAS CON TUBO DE ACERO, Diametro
m

39.00
156.00
39.00
39.00
13.00
13.00

93.16
8.47
7.67
8.27
6.77
7.17

1,213.12
178.77

6.53
10.51

1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63

9.54
8.96
8.38
33.79
19.88
26.76
9.32
11.01
33.39

2.00
9.00
66.55
45.00

1,250.00
220.40
27.66
30.32

16.00
16.00
16.00
67.20
219.38

27.02
600.45
100.39
99.75
67.07

CERRADURA PESADA DE SOBREPONER DE TRES GOLPES EN PUERTAS


DE MADERA, CANTOL PESADA O SIMILAR

13.06
14
14.01
14.02
14.03
15
15.01
15.02
15.03
15.04
16
16.01
16.02
16.03

COBERTURA DE POLICARBONATO TRASLUCUDO, Espesor


GRAS SINTETICO
CORTE Y NIVELACION EN TERRENO NATURAL
BASE COMPACTADA CON MATERIAL FILTRANTE SELECCIO
GRAS SINTETICO EN ZONA DE JUEGOS INFANTILES
JUEGOS INFANTILES
TROMPO SEGUN DISEO
SUBE Y BAJA SEGUN DISEO
COLUMPIOS SEGUN DISEO
TOBOGAN SEGUN DISEO
VARIOS
BASUREROS DE FIBRA DE VIDRIO, Segn modelo
REJILLA DE PERFILES DE ACERO PARA CANALETA DE
JUNTAS DE CONSTRUCCION CON TEKNOPORT DE 1"

003

INSTALACIONES SANITARIAS

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
02.11
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
04
04.01
04.02
04.03
04.04
04.05

Descripcin
APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE BAJO ADULTOS - COLOR
INODORO TANQUE BAJO NIOS - COLOR
LAVATORIOS CON PEDESTAL - COLOR
OVALINES DE COLOR EN MESAS DE C A
URINARIO DE LOZA ACADEMY - COLOR - PARA ADULTOS
PAPELERA DE LOZA DE COLOR DE 15 X 15 cm
JABONERAS DE PARED DE POLICARBONATO
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE PARA VENTILACION EN PVC
SALIDA DE DESAGUE EN PVC DE 4"
SALIDA DE DESAGUE EN PVC DE 2"
TUBERIA DE PVC SAL 4"
TUBERIAS DE PVC SAL 6"
SUMIDERO CROMADO DE 2"
REGISTRO CROMADO DE 4"
CAJA DE REGISTRO 12" x 24" CON MARCO Y TAPA
EXCAVACION DE ZANJAS PARA TUBERIAS Y CAJAS DE
CAMA DE ARENA PARA ZANJAS DE TUBERIAS DE
DESAGUE
H=0.10 m.
RELLENO COMPACTADO
CON MATERIAL PROPIO EN
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA PVC- SAP C-10
RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP - C-10
VALVULAS DE PASE Cim PESADA O SIMILAR DE 1/2"
SUMINISTRO E INSTALACION DE SISTEMA DE IMPULSION
SUMINISTRO E INSTALACION DE VALVULA FLOTADORA DE
SUMINISTRO E INSTALACION DE TANQUE ELEVADO DE POL
SUMINISTRO E INSTALACION DE EQUIPO DE REBOSE Y
EQUIPO DE BOMBEO DE AGUA CON ELECTROBOMBA Y
EXCAVACION ZANJAS TUBERIA DE AGUA
RELLENO COMPACTADO CON MATERIAL PROPIO EN
CASETA PARA ELECTROBOMBA
CONCRETO f'c = 175 Kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL PARA CASETAS
ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60 PARA
TARRAJEO CON IMPERMEABILIZANTE PARA CASETAS DE
PINTURA DOS MANOS SELLADOR Y ESMALTE O SIMILAR

m2

207.27

41.82

m2
m2
m2

200.10
200.10
200.10

4.43
7.62
104.14

u
u
u
u

1.00
1.00
1.00
1.00

1,250.00
1,400.00
1,500.00
1,460.60

u
m
m

2.00
9.00
82.90

660.00
125.00
80.70

Und.

Metrado

Precio S/.

u
u
u
u
u
pza
u

7.00
12.00
14.00
6.00
2.00
19.00
20.00

255.55
245.55
190.45
181.16
181.04
19.91
26.31

pto
pto
pto
m
m
pza
u
pza
m
m
m

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

48.25
50.37
43.79
8.19
11.14
27.76
29.85
94.77
9.00
2.82
10.74

pto
m
pza
glb
u
u
glb
glb
m
m

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

44.04
8.39
55.62
340.23
48.64
469.68
255.82
1,177.34
9.00
10.74

m3
m2
kg
m2
m2

0.75
3.96
36.80
4.92
4.92

283.72
30.08
4.25
19.56
5.12

04.06

REJA DE PROTECCION PARA CASETA ELECTROBOMBA, IN

004

INSTALACIONES ELECTRICAS

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
05
05.01
05.02
05.03

Descripcin
Und.
INSTALACIONES ELECTRICAS
SALIDAS EN TECHOS PARA CENTROS DE LUZ
pto
SALIDA DE PARED (BRAQUETES) CON PVC
pto
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON
pto
SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A
pto
SALIDAS PARA LUZ DE EMERGENCIA EN PARED
pto
SALIDA PARA ELECTROBOMBA
pto
POZOS PUESTA A TIERRA PARA TABLEROS DE
u
ARTEFACTOS Y LUMINARIAS
ARTEFACTO FLUORSCENTE 4 x 22 W Incluye Equipo y
u
ARTEFACTO FLUORESCENTE 2 x 40 W Incluye Equipo y
u
ARTFACTO FLUORESCENTE CIRCULAR DE 32 W PHILIPS
u
BRAQUETE CON LUMINARIA AHORRADORA DE 42 W
u
LUMINARIAS ISLA LED 70 W hm
u
LUMINARIA CIRCULAR DE 150 W, ADOSADO, INCLUYE PANTA
u
POSTES PARA LUMINARIAS
POSTES PARA LUMINARIAS ISLA LED 70 W hm DE ACERO ESTRU u
CONDUCTORES, CABLES Y DUCTOS
CABLE NYY 1 KV 2 x 25 mm2 + 1 x 6 mm2, Suministro e
m
CABLE NYY 1 KV 2 x 16 mm2 x 1 x 6 mm2, Suministro e
m
CABLE NYY 1 KV 2 x 6 mm2 + 1 x 6 mm2, Suministro e
m
CAJA DE PASO METALICA DE 6" x 6" x 4" Con Tapa
u
CAJAS DE DISTRIBUCION F-1
u
CAJAS DE F G PARA MEDIDOR ELECTRICO
u
EXCAVACION DE ZANJAS PARA REDES ELECTRICAS, ANCHO = m
RELLENO ZANJAS CABLES ELECTRICOS CON LADRILLO Y
m
TABLEROS DE DISTRIBUCION
TABLERO GENERAL (T G) CON GABINETE METALICO
u
TABLERO DE DISTRIBUCION - GABINETE METALICO
u
TABLERO DE DISTRIBUCION PARA ELECTROBOMBA
u

Total costo directo


Gastos generales fijos
Gastos generales variables
Utilidad

Sub Total
IGV

Total
Porcentaje de Avance

glb

1.00
Metrado

142.50
Precio S/.

108.00
2.00
6.00
27.00
3.00
1.00
2.00

39.91
43.15
51.29
52.92
31.40
38.19
932.65

65.00
15.00
28.00
2.00
3.00
12.00

134.27
108.53
53.31
31.88
4,654.10
318.17

3.00

920.00

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

26.09
23.36
15.72
20.72
269.79
109.71
8.65
15.46

1.00
6.00
1.00

236.33
318.43
154.67

VALORIZACION AL 25%
ANTERIOR
METRADO

VALORIZADO
(S/.)

ACTUAL
METRADO

165,203.08
Parcial S/.
3,473.34
592.24
881.10
2,000.00
2,878.94
1,577.59
1,301.35
28,007.95
1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05
16,320.20
2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94
84,956.94
1,338.08
19,003.63
26,567.61
6,371.20
10,319.94
9,876.47
38,047.62
2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36
208,056.75
16,457.43
11,726.55
4,730.88
4,631.08
1,453.07
3,178.01
61,559.94

ACUMULADO

VALORIZADO
(S/.)

METRADO

206,503.70

VALORIZADO
(S/.)

371,706.78

1.00
1.00
4.00

592.24
881.10
2,000.00

0.00
0.00
0.00

0.00
0.00
0.00

1.00
1.00
4.00

592.24
881.10
2,000.00

100%
100%
100%

1,772.57
1.00

1,577.59
1,301.35

0.00
0.00

0.00
0.00

1,772.57
1.00

1,577.59
1,301.35

100%
100%

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05

100%
100%
100%
100%
100%
100%
100%
100%

89.66
200.94
16.85
7.00
141.58
483.43
172.87

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

89.66
200.94
16.85
7.00
141.58
483.43
172.87

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

100%
100%
100%
100%
100%
100%
100%

73.40
126.86

1,338.08
19,003.63

0.00
0.00

0.00
0.00

73.40
126.86

1,338.08
19,003.63

100%
100%

30.41
349.71
483.43

6,371.20
10,319.94
9,876.47

0.00
0.00
0.00

0.00
0.00
0.00

30.41
349.71
483.43

6,371.20
10,319.94
9,876.47

100%
100%
100%

717.55
717.55
119.99
176.00
421.56
717.55
57.40

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

717.55
717.55
119.99
176.00
421.56
717.55
57.40

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36

100%
100%
100%
100%
100%
100%
100%

38.42
1,126.40

11,726.55
4,730.88

0.00
0.00

0.00
0.00

38.42
1,126.40

11,726.55
4,730.88

100%
100%

4.54
756.67

1,453.07
3,178.01

0.00
0.00

0.00
0.00

4.54
756.67

1,453.07
3,178.01

100%
100%

12,886.69
16,607.38
32,065.87
42,909.08
9,803.17
5,020.05
28,085.86
57,474.09
14,950.57
16,815.59
15,955.72
9,752.21
5,316.14
2,603.90
747.73
1,964.51
7,345.32
1,852.65
1,592.13
3,900.54
425.13
99.26
109.49
216.38
5,745.21
2,625.41
1,867.15
1,252.65
5,701.21
3,304.57
1,599.44
797.20
492.12
262.98
229.14
34,283.63
14,297.99
19,736.85
248.79

0.00
0.00
2,018.38

0.00
0.00
8,477.20

37.33
499.32
5,616.35

12,886.69
16,607.38
23,588.67

37.33
499.32
7,634.73

12,886.69
16,607.38
32,065.87

100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

30.51
145.72
6,687.11
0.00
46.62
554.97
3,798.98
4,578.50

9,803.17
5,020.05
28,085.86

30.51
145.72
6,687.11

9,803.17
5,020.05
28,085.86

100%
100%
100%

14,950.57
16,815.59
15,955.72
9,752.21

46.62
554.97
3,798.98
4,578.50

14,950.57
16,815.59
15,955.72
9,752.21

100%
100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

7.18
23.00
467.74

2,603.90
747.73
1,964.51

7.18
23.00
467.74

2,603.90
747.73
1,964.51

100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

5.28
52.93
928.70

1,852.65
1,592.13
3,900.54

5.28
52.93
928.70

1,852.65
1,592.13
3,900.54

100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

0.32
3.64
51.52

99.26
109.49
216.38

0.32
3.64
51.52

99.26
109.49
216.38

100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

8.94
48.11
298.25

2,625.41
1,867.15
1,252.65

8.94
48.11
298.25

2,625.41
1,867.15
1,252.65

100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

11.55
45.79
189.81

3,304.57
1,599.44
797.20

11.55
45.79
189.81

3,304.57
1,599.44
797.20

100%
100%
100%

0.00
0.00

0.00
0.00

0.83
6.56

262.98
229.14

0.83
6.56

262.98
229.14

100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

211.29
297.24
0.00

14,297.99
13,714.65
0.00

211.29
297.24
0.00

14,297.99
13,714.65
0.00

100%
69%
0%

0.00
Parcial S/.
44,190.83
7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31
16,697.38
16,697.38
70,437.48
10,946.56
33,287.44

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00

0.00

0.00

0.00

0.00

0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

26,203.48
4,166.05
1,191.01
2,975.04
21,496.22
21,496.22
4,100.49
341.04
2,649.22
1,110.23
61,050.59
29,918.80
2,811.03
23,009.49
5,311.27
5,779.40
2,500.00
850.00
394.40
185.00
370.00
1,480.00
5,757.44
3,633.24
1,321.32
299.13
322.53
88.01
93.21
9,800.54
7,921.67
1,878.87
46,195.84
15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79
7,688.77
2,500.00
1,983.60
1,840.77
1,364.40
41,730.81
432.32
9,607.20
1,606.24
6,703.20
14,713.82

0.00

0.00

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0%
0%

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%

8,668.03
23,249.61
886.44
1,524.76
20,838.41
5,610.60
1,250.00
1,400.00
1,500.00
1,460.60
3,114.00
1,320.00
1,125.00
669.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
Parcial S/.
9,755.28
1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20
9,288.88
530.75
957.03
963.38
403.77
1,196.51
416.40
447.75
852.93
1,433.61
433.97
1,652.78
8,752.81
2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30
752.24
212.79
119.12
156.40
96.24
25.19

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%

142.50

0.00

0.00

0.00

0.00
Parcial S/.
8,130.85
4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30
29,692.28
8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04
2,760.00
2,760.00
5,537.73
635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08
2,301.58
236.33
1,910.58
154.67

0.00

0.00

0.00

0.00

0%

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00

0.00

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

826015

165,203.08

206,503.70

371,706.78

41300.7725
41300.7725
41300.7725
949917.77
170985.198
1120902.97

8,260.15
8,260.15
8,260.15
189,983.55
34,197.04
224,180.58
20%

10,325.18
10,325.18
10,325.18
237,479.25
42,746.26
280,225.51
25%

18,585.34
18,585.34
18,585.34
427,462.79
76,943.30
504,406.10
45%

SALDO
METRADO

VALORIZADO
(S/.)

6,270.97
0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
130.52
6.82

0.00
6,022.20
248.79

0%
31%
100%

371,066.05
446.35
1,427.13
15.82
770.42
38.11
52.93

7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31

100%
100%
100%
100%
100%
100%

625.37

16,697.38

100%

628.03
699.61

10,946.56
33,287.44

100%
100%

352.15

26,203.48

100%

104.75
288.00

1,191.01
2,975.04

100%
100%

446.35

21,496.22

100%

3.95
32.45
19.43

341.04
2,649.22
1,110.23

100%
100%
100%

76.55
13.43
116.61
24.45

29,918.80
2,811.03
23,009.49
5,311.27

100%
100%
100%
100%

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
394.40
185.00
370.00
1,480.00

100%
100%
100%
100%
100%
100%

39.00
156.00
39.00
39.00
13.00
13.00

3,633.24
1,321.32
299.13
322.53
88.01
93.21

100%
100%
100%
100%
100%
100%

1,213.12
178.77

7,921.67
1,878.87

100%
100%

1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63

15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79

100%
100%
100%
100%
100%
100%
100%
100%
100%

2.00
9.00
66.55
45.00

2,500.00
1,983.60
1,840.77
1,364.40

100%
100%
100%
100%

16.00
16.00
16.00
67.20
219.38

432.32
9,607.20
1,606.24
6,703.20
14,713.82

100%
100%
100%
100%
100%

207.27

8,668.03

100%

200.10
200.10
200.10

886.44
1,524.76
20,838.41

100%
100%
100%

1.00
1.00
1.00
1.00

1,250.00
1,400.00
1,500.00
1,460.60

100%
100%
100%
100%

2.00
9.00
82.90

1,320.00
1,125.00
669.00

100%
100%
100%

28,549.21
7.00
12.00
14.00
6.00
2.00
19.00
20.00

1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20

100%
100%
100%
100%
100%
100%
100%

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

530.75
957.03
963.38
403.77
1,196.51
416.40
447.75
852.93
1,433.61
433.97
1,652.78

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.75
3.96
36.80
4.92
4.92

212.79
119.12
156.40
96.24
25.19

100%
100%
100%
100%
100%

1.00

142.50

100%

48,422.44
108.00
2.00
6.00
27.00
3.00
1.00
2.00

4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30

100%
100%
100%
100%
100%
100%
100%

65.00
15.00
28.00
2.00
3.00
12.00

8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04

100%
100%
100%
100%
100%
100%

3.00

2,760.00

100%

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08

100%
100%
100%
100%
100%
100%
100%
100%

1.00
6.00
1.00

236.33
1,910.58
154.67

100%
100%
100%

454,308.67
22,715.43
22,715.43
22,715.43
522,454.97
94,041.90
616,496.87
55%

001

ESTRUCTURAS

Item
01
01.01
01.02
01.03
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
05
05.01
05.02
05.03
05.03.01
05.03.02
05.04
05.05
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
05.05.06
05.05.07
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03

Descripcin
OBRAS PROVISIONALES
TRANSPORTE DE EQUIPOS, HERRAMIENTAS Y MADERA
CARTEL DE OBRA DE 6.00 M x 3.60 M.
CASETA PARA ALMACEN Y GUARDIANIA
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO EN EDIFICACION
APUNTALAMIENTO DE ESTRUCTURA METALICA
DEMOLICIONES
DESMONTAJE DE TECHOS DE ETERNIT - Incluye
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS BAJAS
DESMONTAJE DE VENTANAS ALTAS
DESMONTAJE DE APARATOS SANITARIOS
DEMOLICION Y ELIMINACION DE CONSTRUCCION
DEMOLICION DE PISOS Y VEREDAS EXISTENTES
ELIMINACION DE MATERIAL EXCEDENTE DE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
EXCAVACION PARA CISTERNA
EXCAVACION PARA JARDINERAS Y SARDINELES
RELLENO COMPACTADO MANUAL EN ZONAS DE
NIVELACION INTERIOR Y APISONADO MANUAL PARA
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADOS DE CONCRETO f'c=100 kg/cm2 h=0.10 m.
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTOSOBRECIMIENTOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORMAL PARA
CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTOPISOS Y PAVIMENTOS
PERFILADO, NIVELACION Y COMPACTACION DE SUB
BASE GRANULAR EN AULAS EXTERIORES Y VEREDAS
PISO DE CONCRETO SIN COLOREAR, f'c=175 Kg/cm2 - AC
VEREDAS DE CONCRETO, f'c=175kg/cm2 h=0.10m ACABAD
PISOS DE C, ACABADO RUGOSO FROTACHADO PARA CER
CURADO DE VEREDAS Y LOSAS CON CURADOR QUIMICO
JUNTAS DE DILATACION EN VEREDAS Y LOSAS C/3m, CON
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=210 kg/cm2
ZAPATAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2
VIGAS DE CIMENTACION: ACERO DE REFUERZO Fy = 4200
COLUMNAS

Und.

Metrado

Precio S/.

glb
u
mes

1.00
1.00
4.00

592.24
881.10
500.00

m2
glb

1,772.57
1.00

0.89
1,301.35

m2
u
u
u
u
m2
m2
m3

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

5.33
28.23
28.23
18.82
18.82
39.86
15.76
21.27

m3
m3
m3
m3
m3
m2
m3

89.66
200.94
16.85
7.00
141.58
483.43
172.87

27.02
27.02
30.88
27.02
18.45
3.04
21.27

m2
m3

73.40
126.86

18.23
149.80

m3
m2
m2

30.41
349.71
483.43

209.51
29.51
20.43

m2
m2
m2
m2
m2
m2
m

717.55
717.55
119.99
176.00
421.56
717.55
57.40

3.12
8.72
40.88
41.25
39.28
0.82
4.17

m3
kg

38.42
1,126.40

305.22
4.20

m3
kg

4.54
756.67

320.06
4.20

06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.05.04
06.06
06.06.01
06.06.02
06.06.03
06.07
06.07.01
06.07.02
06.07.03
06.08
06.08.01
06.08.02
06.08.03
06.09
06.09.01
06.09.02
06.09.03
06.10
06.10.01
06.10.02
06.10.03
06.11
06.11.01
06.11.02
07
07.01
07.02
07.03

COLUMNAS: CONCRETO f'c=210 kg/cm2


COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL
COLUMNAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2
VIGAS
VIGAS: CONCRETO f'c=210kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL
VIGAS: ACERO DE REFUERZO Fy = 4200 kg/cm2 GRADO 60
LOSA ALIGERADA
LOSA ALIGERADA: CONCRETO f'c=210kg/cm2
LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA: ACERO DE REFUERZO Fy = 4200 kg/cm2
BLOQUES HUECOS DE ARCILLA DE 0.30m x 0.30m x 0.15m
CISTERNA
CISTERNA: CONCRETO f'c=210kg/cm2
CISTERNA: ENCOFRADO Y DESENCOFRADO NORMAL
CISTERNA: ACERO DE REFUERZO Fy = 4200 Kg/cm2
APOYOS DE T.E. y COBERTURA PATIO
APOYO T.E. CONCRETO f'c=210 kg/cm2
APOYO T.E. ENCOFRADO Y DESENCOFRADO NORMAL
APOYO T.E. ACERO DE REFUERZO Fy = 4200 Kg/cm2
MESAS DE CONCRETO ARMADO
MESAS DE CA CONCRETO f'c=210 kg/cm2
MESAS DE CA ENCOFRADO Y DESENCOFRADO
MESAS DE CA ACERO DE REFUERZO Fy = 4200 Kg/cm2
JARDINERAS DE CONCRETO
JARDINERAS: CONCRETO f'c=175 kg/cm2
JARDINERAS: ENCOFRADO Y DESENCOFRADO NORMAL
JADINERAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2
ESCENARIO
ESCENARIO: CONCRETO f'c=175 kg/cm2
ESCENARIO: ENCOFRADO Y DESNCOFRADO NORMAL
ESCENARIO: ACERO DE REFUERZO Fy = 4200 Kg/cm2
CANALETA PARA AGUAS DE LLUVIA
CANALETA: CONCRETO f'c=210 Kg/cm2
CANALETA: ENCOFRADO Y DESENCOFRADO NORMAL
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18

002

ARQUITECTURA

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
02
02.01
03
03.01
03.02

Descripcin
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO RAYADO, C:A = 1:4
TARRAJEO EN MUROS Y COLUMNAS, C:A = 1:4
TARRAJEO FROTACHADO EN JARDINERAS Y SARDINELES
VESTIDURA DE DERRAMES CON MEZCLA C:A 1:4 E(min)
TARRAJEO CON IMPERMEABILIZANTES EN INTERIOR DE
TARRAJEO EN APOYO T.E. y COBERTURA PATIO
CIELORRASOS
CIELORRASOS CON MEZCLA C:A 1:4 - E(min) = 1.5 cm.
PISOS Y PAVIMENTOS
CONTRAPISO DE 50 mm
PISOS DE CERAMICA COLOR ALTO TRANSITO, PEI = 5

m3
m2
kg

37.33
499.32
7,634.73

345.21
33.26
4.20

m3
m2
kg

30.51
145.72
6,687.11

321.31
34.45
4.20

m3
m2
kg
u

46.62
554.97
3,798.98
4,578.50

320.69
30.30
4.20
2.13

m3
m2
kg

7.18
23.00
467.74

362.66
32.51
4.20

m3
m2
kg

5.28
52.93
928.70

350.88
30.08
4.20

m3
m2
kg

0.32
3.64
51.52

310.20
30.08
4.20

m3
m2
kg

8.94
48.11
298.25

293.67
38.81
4.20

m3
m2
kg

11.55
45.79
189.81

286.11
34.93
4.20

m3
m2

0.83
6.56

316.84
34.93

m2
m2
m2

211.29
427.76
6.82

67.67
46.14
36.48

Und.

Metrado

Precio S/.

m2
m2
m2
m
m2
m2

446.35
1,427.13
15.82
770.42
38.11
52.93

15.85
19.56
17.38
9.25
20.07
19.56

m2

625.37

26.70

m2
m2

628.03
699.61

17.43
47.58

03.03
04
04.01
04.02
05
05.01
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
08
08.01
08.02
08.03
08.04
08.05
08.06
09
09.01
09.02
09.03
09.04
09.05
09.06
10
10.01
10.02
11
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
12
12.01
12.02
12.03
12.04
13
13.01
13.02
13.03
13.04
13.05

PISOS DE PORCELANATO, COLOR, ALTO TRANSITO, PEI =


CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO EN EXTRIORES,
CONTRAZOCALO DE CERAMICA EN INTERIORES, H = 0.20
ZOCALOS
ZOCALO DE CERAMICA COLOR, ALTO TRANSITO, PEI = 5,
REVESTIMIENTO DE GRADAS, ESCALERAS y OTROS
REVESTIMIENTO MESAS DE C A PORCELANATO
REVESTIMIENTO BORDES DE JARDINERAS Y
REVESTIMIENTO DE GRADAS CON CERMICO
CARPINTERIA DE MADERA

m2

352.15

74.41

m
m

104.75
288.00

11.37
10.33

m2

446.35

48.16

m2
m
m2

3.95
32.45
19.43

86.34
81.64
57.14

PUERTAS EXTERIORES DE MADERA CEDRO NACIONAL, CON


TABLEROS,
Segn lo indicado
en detalle
de planos
PUERTAS INTERIORES
ss hh DE
MADERA
CEDRO NACIONAL,
CON TABLEROS,
lo indicado
en detalle
de planos
VENTANAS
BAJASSegn
DE MADERA
CEDRO
NACIONAL,
CON
SEGURIDAD,
Segn
lo
indicado
en
los
detalles
y
planos
VENTANAS ALTAS DE MADERA CEDRO NACIONAL, CON
SEGURIDAD,
Segn
lo indicado en los detalles y planos
CARPINTERIA
METALICA

m2
m2
m2
m2

76.55
13.43
116.61
24.45

390.84
209.31
197.32
217.23

PUERTA METALICA EN INGRESO PRINCIPAL


PUERTA METALICA EN INGRESO SECUNDARIO
BARRA PARA DISCAPACITADOS EN SS HH
BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn
BARANDA DE PROTECCION EN ESCENARIO, Segn Diseo
BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn
CERRAJERIA

u
u
u
glb
glb
m

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
98.60
185.00
185.00
185.00

u
BISAGRA ALUMINIZADA PESADA DE 5" PARA PUERTAS DE
u
u
BISAGRA ALUMINIZADA PESADA DE 3" PARA PUERTAS EN
JALADORES DE BRONCE DE 4" PARA PUERTAS DE
u
JALADORES DE BRONCE DE 3" PARA PUERTAS
u
CERROJOS DE BRONCE PARA PUERTAS INTERIORES DE
u
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS DOBLES NACIONALES
p2
ESPEJOS DE 6 mm CRISTAL IMPORTADO EN SS HH
p2
PINTURA
PINTURA EN MUROS Y COLUMNAS, LATEX DOS MANOS, Superm m2
PINTURA EN CIELORASOS Y VIGAS, LATEX DOS MANOS,
m2
PINTURA EN JARDINERAS y SARDINELES, OLEO DOS
m2
PINTURA EN PUERTAS CON BARNIZ MARINO, DOS MANOS
m2
PINTURA EN VENTANAS DE MADERA CON BARNIZ
m2
PINTURA EN ESTRUCTURAS METALICAS DE TECHO, DOS MAN m2
PINTURA EN COBERTURA DE JUEGOS INFANTILES
m2
PINTURA EN BARANDAS METALICAS DE PROTECCION
m
PINTURA EN PUERTAS METALICAS, DOS MANOS, CON
m2
COBERTURA METALICA EN PATIO
TIJERALES ACERO CORRUGADO COBERTURA PATIO,
u
CERCHA SECUNDARIA COBERTURA PATIO PRINCIPAL,
u
COBERTURA EN PATIO PRINCIPAL CON PLANCHAS DE CALAMINAm2
SUSTITUCION DE PLANCHAS DETERIORADAS COBERTURA PATIOm2
COBERTURA EN ZONA DE JUEGOS
EXCAVACION PARA DADOS ANCLAJE COLUMNAS DE
u
COLUMNAS DE TUBOS DE ACERO, Diametro = 6", Espesor =
u
DADOS DE C f'c = 175 Kg/cm2 ANCLAJE DE COLUMNAS DE
u
CERCHAS PRINCIPALES CON TUBOS DE ACERO DE 1", 3/4" y 1/2 m
CERCHAS SECUNDARIAS CON TUBO DE ACERO, Diametro
m

39.00
156.00
39.00
39.00
13.00
13.00

93.16
8.47
7.67
8.27
6.77
7.17

1,213.12
178.77

6.53
10.51

1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63

9.54
8.96
8.38
33.79
19.88
26.76
9.32
11.01
33.39

2.00
9.00
66.55
45.00

1,250.00
220.40
27.66
30.32

16.00
16.00
16.00
67.20
219.38

27.02
600.45
100.39
99.75
67.07

CERRADURA PESADA DE SOBREPONER DE TRES GOLPES EN PUERTAS


DE MADERA, CANTOL PESADA O SIMILAR

13.06
14
14.01
14.02
14.03
15
15.01
15.02
15.03
15.04
16
16.01
16.02
16.03

COBERTURA DE POLICARBONATO TRASLUCUDO, Espesor


GRAS SINTETICO
CORTE Y NIVELACION EN TERRENO NATURAL
BASE COMPACTADA CON MATERIAL FILTRANTE SELECCIO
GRAS SINTETICO EN ZONA DE JUEGOS INFANTILES
JUEGOS INFANTILES
TROMPO SEGUN DISEO
SUBE Y BAJA SEGUN DISEO
COLUMPIOS SEGUN DISEO
TOBOGAN SEGUN DISEO
VARIOS
BASUREROS DE FIBRA DE VIDRIO, Segn modelo
REJILLA DE PERFILES DE ACERO PARA CANALETA DE
JUNTAS DE CONSTRUCCION CON TEKNOPORT DE 1"

003

INSTALACIONES SANITARIAS

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
02.11
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
04
04.01
04.02
04.03
04.04
04.05

Descripcin
APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE BAJO ADULTOS - COLOR
INODORO TANQUE BAJO NIOS - COLOR
LAVATORIOS CON PEDESTAL - COLOR
OVALINES DE COLOR EN MESAS DE C A
URINARIO DE LOZA ACADEMY - COLOR - PARA ADULTOS
PAPELERA DE LOZA DE COLOR DE 15 X 15 cm
JABONERAS DE PARED DE POLICARBONATO
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE PARA VENTILACION EN PVC
SALIDA DE DESAGUE EN PVC DE 4"
SALIDA DE DESAGUE EN PVC DE 2"
TUBERIA DE PVC SAL 4"
TUBERIAS DE PVC SAL 6"
SUMIDERO CROMADO DE 2"
REGISTRO CROMADO DE 4"
CAJA DE REGISTRO 12" x 24" CON MARCO Y TAPA
EXCAVACION DE ZANJAS PARA TUBERIAS Y CAJAS DE
CAMA DE ARENA PARA ZANJAS DE TUBERIAS DE
DESAGUE
H=0.10 m.
RELLENO COMPACTADO
CON MATERIAL PROPIO EN
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA PVC- SAP C-10
RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP - C-10
VALVULAS DE PASE Cim PESADA O SIMILAR DE 1/2"
SUMINISTRO E INSTALACION DE SISTEMA DE IMPULSION
SUMINISTRO E INSTALACION DE VALVULA FLOTADORA DE
SUMINISTRO E INSTALACION DE TANQUE ELEVADO DE POL
SUMINISTRO E INSTALACION DE EQUIPO DE REBOSE Y
EQUIPO DE BOMBEO DE AGUA CON ELECTROBOMBA Y
EXCAVACION ZANJAS TUBERIA DE AGUA
RELLENO COMPACTADO CON MATERIAL PROPIO EN
CASETA PARA ELECTROBOMBA
CONCRETO f'c = 175 Kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL PARA CASETAS
ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60 PARA
TARRAJEO CON IMPERMEABILIZANTE PARA CASETAS DE
PINTURA DOS MANOS SELLADOR Y ESMALTE O SIMILAR

m2

207.27

41.82

m2
m2
m2

200.10
200.10
200.10

4.43
7.62
104.14

u
u
u
u

1.00
1.00
1.00
1.00

1,250.00
1,400.00
1,500.00
1,460.60

u
m
m

2.00
9.00
82.90

660.00
125.00
80.70

Und.

Metrado

Precio S/.

u
u
u
u
u
pza
u

7.00
12.00
14.00
6.00
2.00
19.00
20.00

255.55
245.55
190.45
181.16
181.04
19.91
26.31

pto
pto
pto
m
m
pza
u
pza
m
m
m

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

48.25
50.37
43.79
8.19
11.14
27.76
29.85
94.77
9.00
2.82
10.74

pto
m
pza
glb
u
u
glb
glb
m
m

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

44.04
8.39
55.62
340.23
48.64
469.68
255.82
1,177.34
9.00
10.74

m3
m2
kg
m2
m2

0.75
3.96
36.80
4.92
4.92

283.72
30.08
4.25
19.56
5.12

04.06

REJA DE PROTECCION PARA CASETA ELECTROBOMBA, IN

004

INSTALACIONES ELECTRICAS

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
05
05.01
05.02
05.03

Descripcin
Und.
INSTALACIONES ELECTRICAS
SALIDAS EN TECHOS PARA CENTROS DE LUZ
pto
SALIDA DE PARED (BRAQUETES) CON PVC
pto
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON
pto
SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A
pto
SALIDAS PARA LUZ DE EMERGENCIA EN PARED
pto
SALIDA PARA ELECTROBOMBA
pto
POZOS PUESTA A TIERRA PARA TABLEROS DE
u
ARTEFACTOS Y LUMINARIAS
ARTEFACTO FLUORSCENTE 4 x 22 W Incluye Equipo y
u
ARTEFACTO FLUORESCENTE 2 x 40 W Incluye Equipo y
u
ARTFACTO FLUORESCENTE CIRCULAR DE 32 W PHILIPS
u
BRAQUETE CON LUMINARIA AHORRADORA DE 42 W
u
LUMINARIAS ISLA LED 70 W hm
u
LUMINARIA CIRCULAR DE 150 W, ADOSADO, INCLUYE PANTA
u
POSTES PARA LUMINARIAS
POSTES PARA LUMINARIAS ISLA LED 70 W hm DE ACERO ESTRU u
CONDUCTORES, CABLES Y DUCTOS
CABLE NYY 1 KV 2 x 25 mm2 + 1 x 6 mm2, Suministro e
m
CABLE NYY 1 KV 2 x 16 mm2 x 1 x 6 mm2, Suministro e
m
CABLE NYY 1 KV 2 x 6 mm2 + 1 x 6 mm2, Suministro e
m
CAJA DE PASO METALICA DE 6" x 6" x 4" Con Tapa
u
CAJAS DE DISTRIBUCION F-1
u
CAJAS DE F G PARA MEDIDOR ELECTRICO
u
EXCAVACION DE ZANJAS PARA REDES ELECTRICAS, ANCHO = m
RELLENO ZANJAS CABLES ELECTRICOS CON LADRILLO Y
m
TABLEROS DE DISTRIBUCION
TABLERO GENERAL (T G) CON GABINETE METALICO
u
TABLERO DE DISTRIBUCION - GABINETE METALICO
u
TABLERO DE DISTRIBUCION PARA ELECTROBOMBA
u

Total costo directo


Gastos generales fijos
Gastos generales variables
Utilidad

Sub Total
IGV

Total
Porcentaje de Avance

glb

1.00
Metrado

142.50
Precio S/.

108.00
2.00
6.00
27.00
3.00
1.00
2.00

39.91
43.15
51.29
52.92
31.40
38.19
932.65

65.00
15.00
28.00
2.00
3.00
12.00

134.27
108.53
53.31
31.88
4,654.10
318.17

3.00

920.00

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

26.09
23.36
15.72
20.72
269.79
109.71
8.65
15.46

1.00
6.00
1.00

236.33
318.43
154.67

VALORIZACION AL 25%
ANTERIOR
METRADO

VALORIZADO
(S/.)

ACTUAL
METRADO

371,706.78
Parcial S/.
3,473.34
592.24
881.10
2,000.00
2,878.94
1,577.59
1,301.35
28,007.95
1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05
16,320.20
2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94
84,956.94
1,338.08
19,003.63
26,567.61
6,371.20
10,319.94
9,876.47
38,047.62
2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36
208,056.75
16,457.43
11,726.55
4,730.88
4,631.08
1,453.07
3,178.01
61,559.94

ACUMULADO

VALORIZADO
(S/.)

METRADO

6,270.99

VALORIZADO
(S/.)

377,977.76

1.00
1.00
4.00

592.24
881.10
2,000.00

0.00
0.00
0.00

0.00
0.00
0.00

1.00
1.00
4.00

592.24
881.10
2,000.00

100%
100%
100%

1,772.57
1.00

1,577.59
1,301.35

0.00
0.00

0.00
0.00

1,772.57
1.00

1,577.59
1,301.35

100%
100%

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05

100%
100%
100%
100%
100%
100%
100%
100%

89.66
200.94
16.85
7.00
141.58
483.43
172.87

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

89.66
200.94
16.85
7.00
141.58
483.43
172.87

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

100%
100%
100%
100%
100%
100%
100%

73.40
126.86

1,338.08
19,003.63

0.00
0.00

0.00
0.00

73.40
126.86

1,338.08
19,003.63

100%
100%

30.41
349.71
483.43

6,371.20
10,319.94
9,876.47

0.00
0.00
0.00

0.00
0.00
0.00

30.41
349.71
483.43

6,371.20
10,319.94
9,876.47

100%
100%
100%

717.55
717.55
119.99
176.00
421.56
717.55
57.40

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

717.55
717.55
119.99
176.00
421.56
717.55
57.40

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36

100%
100%
100%
100%
100%
100%
100%

38.42
1,126.40

11,726.55
4,730.88

0.00
0.00

0.00
0.00

38.42
1,126.40

11,726.55
4,730.88

100%
100%

4.54
756.67

1,453.07
3,178.01

0.00
0.00

0.00
0.00

4.54
756.67

1,453.07
3,178.01

100%
100%

12,886.69
16,607.38
32,065.87
42,909.08
9,803.17
5,020.05
28,085.86
57,474.09
14,950.57
16,815.59
15,955.72
9,752.21
5,316.14
2,603.90
747.73
1,964.51
7,345.32
1,852.65
1,592.13
3,900.54
425.13
99.26
109.49
216.38
5,745.21
2,625.41
1,867.15
1,252.65
5,701.21
3,304.57
1,599.44
797.20
492.12
262.98
229.14
34,283.63
14,297.99
19,736.85
248.79

37.33
499.32
7,634.73

12,886.69
16,607.38
32,065.87

0.00
0.00
0.00

0.00
0.00
0.00

37.33
499.32
7,634.73

12,886.69
16,607.38
32,065.87

100%
100%
100%

30.51
145.72
6,687.11

9,803.17
5,020.05
28,085.86

0.00
0.00
0.00

0.00
0.00
0.00

30.51
145.72
6,687.11

9,803.17
5,020.05
28,085.86

100%
100%
100%

46.62
554.97
3,798.98
4,578.50

14,950.57
16,815.59
15,955.72
9,752.21

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

46.62
554.97
3,798.98
4,578.50

14,950.57
16,815.59
15,955.72
9,752.21

100%
100%
100%
100%

7.18
23.00
467.74

2,603.90
747.73
1,964.51

0.00
0.00
0.00

0.00
0.00
0.00

7.18
23.00
467.74

2,603.90
747.73
1,964.51

100%
100%
100%

5.28
52.93
928.70

1,852.65
1,592.13
3,900.54

0.00
0.00
0.00

0.00
0.00
0.00

5.28
52.93
928.70

1,852.65
1,592.13
3,900.54

100%
100%
100%

0.32
3.64
51.52
0.00
8.94
48.11
298.25

99.26
109.49
216.38

0.00
0.00
0.00

0.32
3.64
51.52

99.26
109.49
216.38

100%
100%
100%

2,625.41
1,867.15
1,252.65

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

8.94
48.11
298.25

2,625.41
1,867.15
1,252.65

100%
100%
100%

11.55
45.79
189.81

3,304.57
1,599.44
797.20

0.00
0.00
0.00

0.00
0.00
0.00

11.55
45.79
189.81

3,304.57
1,599.44
797.20

100%
100%
100%

0.83
6.56
0.00
211.29
297.24
0.00

262.98
229.14

0.00
0.00
0.00
0.00
130.52
6.82

0.00
0.00

0.83
6.56

262.98
229.14

100%
100%

0.00
6,022.19
248.79

211.29
427.76
6.82

14,297.99
19,736.85
248.79

100%
100%
100%

14,297.99
13,714.65
0.00

0.00
Parcial S/.
44,190.83
7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31
16,697.38
16,697.38
70,437.48
10,946.56
33,287.44

241,533.82

241,533.82

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

446.35
1,427.13
15.82
770.42
38.11
52.93

7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31

446.35
1,427.13
15.82
770.42
38.11
52.93

7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31

100%
100%
100%
100%
100%
100%

0.00

0.00

625.37

16,697.38

625.37

16,697.38

100%

0.00
0.00

0.00
0.00

628.03
699.61

10,946.56
33,287.44

628.03
699.61

10,946.56
33,287.44

100%
100%

26,203.48
4,166.05
1,191.01
2,975.04
21,496.22
21,496.22
4,100.49
341.04
2,649.22
1,110.23
61,050.59
29,918.80
2,811.03
23,009.49
5,311.27
5,779.40
2,500.00
850.00
394.40
185.00
370.00
1,480.00
5,757.44
3,633.24
1,321.32
299.13
322.53
88.01
93.21
9,800.54
7,921.67
1,878.87
46,195.84
15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79
7,688.77
2,500.00
1,983.60
1,840.77
1,364.40
41,730.81
432.32
9,607.20
1,606.24
6,703.20
14,713.82

0.00

0.00

352.15

26,203.48

352.15

26,203.48

100%

0.00
0.00

0.00
0.00

104.75
288.00

1,191.01
2,975.04

104.75
288.00

1,191.01
2,975.04

100%
100%

0.00

0.00

446.35

21,496.22

446.35

21,496.22

100%

0.00
0.00
0.00

0.00
0.00
0.00

3.95
32.45
19.43

341.04
2,649.22
1,110.23

3.95
32.45
19.43

341.04
2,649.22
1,110.23

100%
100%
100%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

76.55
13.43
116.61
24.45

29,918.80
2,811.03
23,009.49
5,311.27

76.55
13.43
116.61
24.45

29,918.80
2,811.03
23,009.49
5,311.27

100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

2,500.00
850.00
394.40
185.00
370.00
1,480.00

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
394.40
185.00
370.00
1,480.00

100%
100%
100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00

1.00
1.00
4.00
1.00
2.00
8.00
0.00
39.00
156.00
39.00
39.00
13.00
13.00

3,633.24
1,321.32
299.13
322.53
88.01
93.21

39.00
156.00
39.00
39.00
13.00
13.00

3,633.24
1,321.32
299.13
322.53
88.01
93.21

100%
100%
100%
100%
100%
100%

0.00
0.00

0.00
0.00

1,203.36
0.00

7,857.94
0.00

1,203.36
0.00

7,857.94
0.00

99%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%

8,668.03
23,249.61
886.44
1,524.76
20,838.41
5,610.60
1,250.00
1,400.00
1,500.00
1,460.60
3,114.00
1,320.00
1,125.00
669.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
Parcial S/.
9,755.28
1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20
9,288.88
530.75
957.03
963.38
403.77
1,196.51
416.40
447.75
852.93
1,433.61
433.97
1,652.78
8,752.81
2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30
752.24
212.79
119.12
156.40
96.24
25.19

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%

142.50

0.00

0.00

0.00

0.00
Parcial S/.
8,130.85
4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30
29,692.28
8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04
2,760.00
2,760.00
5,537.73
635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08
2,301.58
236.33
1,910.58
154.67

0.00

0.00

0.00

0.00

0%

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00

0.00

0.00

0.00

0.00

0.00

0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

826015

371,706.78

247,804.81

619,511.59

41300.7725
41300.7725
41300.7725
949917.77
170985.198
1120902.97

18,585.34
18,585.34
18,585.34
427,462.79
76,943.30
504,406.10
45%

12,390.24
12,390.24
12,390.24
284,975.53
51,295.60
336,271.13
30%

30,975.58
30,975.58
30,975.58
712,438.32
128,238.90
840,677.22
75%

SALDO
METRADO

VALORIZADO
(S/.)

-0.01
0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

129,532.23
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.01
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00

0.00

0%

0.00
0.00

0.00
0.00

0%
0%

0.00

0.00

0%

0.00
0.00

0.00
0.00

0%
0%

0.00

0.00

0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

9.76
178.77

63.73
1,878.87

1%
100%

1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63

15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79

100%
100%
100%
100%
100%
100%
100%
100%
100%

2.00
9.00
66.55
45.00

2,500.00
1,983.60
1,840.77
1,364.40

100%
100%
100%
100%

16.00
16.00
16.00
67.20
219.38

432.32
9,607.20
1,606.24
6,703.20
14,713.82

100%
100%
100%
100%
100%

207.27

8,668.03

100%

200.10
200.10
200.10

886.44
1,524.76
20,838.41

100%
100%
100%

1.00
1.00
1.00
1.00

1,250.00
1,400.00
1,500.00
1,460.60

100%
100%
100%
100%

2.00
9.00
82.90

1,320.00
1,125.00
669.00

100%
100%
100%

28,549.21
7.00
12.00
14.00
6.00
2.00
19.00
20.00

1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20

100%
100%
100%
100%
100%
100%
100%

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

530.75
957.03
963.38
403.77
1,196.51
416.40
447.75
852.93
1,433.61
433.97
1,652.78

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.75
3.96
36.80
4.92
4.92

212.79
119.12
156.40
96.24
25.19

100%
100%
100%
100%
100%

1.00

142.50

100%

48,422.44
108.00
2.00
6.00
27.00
3.00
1.00
2.00

4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30

100%
100%
100%
100%
100%
100%
100%

65.00
15.00
28.00
2.00
3.00
12.00

8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04

100%
100%
100%
100%
100%
100%

3.00

2,760.00

100%

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08

100%
100%
100%
100%
100%
100%
100%
100%

1.00
6.00
1.00

236.33
1,910.58
154.67

100%
100%
100%

206,503.86
10,325.19
10,325.19
10,325.19
237,479.44
42,746.30
280,225.74
25%

001

ESTRUCTURAS

Item
01
01.01
01.02
01.03
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
05
05.01
05.02
05.03
05.03.01
05.03.02
05.04
05.05
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
05.05.06
05.05.07
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03

Descripcin
OBRAS PROVISIONALES
TRANSPORTE DE EQUIPOS, HERRAMIENTAS Y MADERA
CARTEL DE OBRA DE 6.00 M x 3.60 M.
CASETA PARA ALMACEN Y GUARDIANIA
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO EN EDIFICACION
APUNTALAMIENTO DE ESTRUCTURA METALICA
DEMOLICIONES
DESMONTAJE DE TECHOS DE ETERNIT - Incluye
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS BAJAS
DESMONTAJE DE VENTANAS ALTAS
DESMONTAJE DE APARATOS SANITARIOS
DEMOLICION Y ELIMINACION DE CONSTRUCCION
DEMOLICION DE PISOS Y VEREDAS EXISTENTES
ELIMINACION DE MATERIAL EXCEDENTE DE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
EXCAVACION PARA CISTERNA
EXCAVACION PARA JARDINERAS Y SARDINELES
RELLENO COMPACTADO MANUAL EN ZONAS DE
NIVELACION INTERIOR Y APISONADO MANUAL PARA
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADOS DE CONCRETO f'c=100 kg/cm2 h=0.10 m.
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTOSOBRECIMIENTOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORMAL PARA
CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTOPISOS Y PAVIMENTOS
PERFILADO, NIVELACION Y COMPACTACION DE SUB
BASE GRANULAR EN AULAS EXTERIORES Y VEREDAS
PISO DE CONCRETO SIN COLOREAR, f'c=175 Kg/cm2 - AC
VEREDAS DE CONCRETO, f'c=175kg/cm2 h=0.10m ACABAD
PISOS DE C, ACABADO RUGOSO FROTACHADO PARA CER
CURADO DE VEREDAS Y LOSAS CON CURADOR QUIMICO
JUNTAS DE DILATACION EN VEREDAS Y LOSAS C/3m, CON
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO f'c=210 kg/cm2
ZAPATAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2
VIGAS DE CIMENTACION: ACERO DE REFUERZO Fy = 4200
COLUMNAS

Und.

Metrado

Precio S/.

glb
u
mes

1.00
1.00
4.00

592.24
881.10
500.00

m2
glb

1,772.57
1.00

0.89
1,301.35

m2
u
u
u
u
m2
m2
m3

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

5.33
28.23
28.23
18.82
18.82
39.86
15.76
21.27

m3
m3
m3
m3
m3
m2
m3

89.66
200.94
16.85
7.00
141.58
483.43
172.87

27.02
27.02
30.88
27.02
18.45
3.04
21.27

m2
m3

73.40
126.86

18.23
149.80

m3
m2
m2

30.41
349.71
483.43

209.51
29.51
20.43

m2
m2
m2
m2
m2
m2
m

717.55
717.55
119.99
176.00
421.56
717.55
57.40

3.12
8.72
40.88
41.25
39.28
0.82
4.17

m3
kg

38.42
1,126.40

305.22
4.20

m3
kg

4.54
756.67

320.06
4.20

06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.05.04
06.06
06.06.01
06.06.02
06.06.03
06.07
06.07.01
06.07.02
06.07.03
06.08
06.08.01
06.08.02
06.08.03
06.09
06.09.01
06.09.02
06.09.03
06.10
06.10.01
06.10.02
06.10.03
06.11
06.11.01
06.11.02
07
07.01
07.02
07.03

COLUMNAS: CONCRETO f'c=210 kg/cm2


COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL
COLUMNAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2
VIGAS
VIGAS: CONCRETO f'c=210kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL
VIGAS: ACERO DE REFUERZO Fy = 4200 kg/cm2 GRADO 60
LOSA ALIGERADA
LOSA ALIGERADA: CONCRETO f'c=210kg/cm2
LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA: ACERO DE REFUERZO Fy = 4200 kg/cm2
BLOQUES HUECOS DE ARCILLA DE 0.30m x 0.30m x 0.15m
CISTERNA
CISTERNA: CONCRETO f'c=210kg/cm2
CISTERNA: ENCOFRADO Y DESENCOFRADO NORMAL
CISTERNA: ACERO DE REFUERZO Fy = 4200 Kg/cm2
APOYOS DE T.E. y COBERTURA PATIO
APOYO T.E. CONCRETO f'c=210 kg/cm2
APOYO T.E. ENCOFRADO Y DESENCOFRADO NORMAL
APOYO T.E. ACERO DE REFUERZO Fy = 4200 Kg/cm2
MESAS DE CONCRETO ARMADO
MESAS DE CA CONCRETO f'c=210 kg/cm2
MESAS DE CA ENCOFRADO Y DESENCOFRADO
MESAS DE CA ACERO DE REFUERZO Fy = 4200 Kg/cm2
JARDINERAS DE CONCRETO
JARDINERAS: CONCRETO f'c=175 kg/cm2
JARDINERAS: ENCOFRADO Y DESENCOFRADO NORMAL
JADINERAS: ACERO DE REFUERZO Fy = 4200 Kg/cm2
ESCENARIO
ESCENARIO: CONCRETO f'c=175 kg/cm2
ESCENARIO: ENCOFRADO Y DESNCOFRADO NORMAL
ESCENARIO: ACERO DE REFUERZO Fy = 4200 Kg/cm2
CANALETA PARA AGUAS DE LLUVIA
CANALETA: CONCRETO f'c=210 Kg/cm2
CANALETA: ENCOFRADO Y DESENCOFRADO NORMAL
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18
MURO DE LADRILLO DE ARCILLA MAQUINADO DE 18

002

ARQUITECTURA

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
02
02.01
03
03.01
03.02

Descripcin
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO RAYADO, C:A = 1:4
TARRAJEO EN MUROS Y COLUMNAS, C:A = 1:4
TARRAJEO FROTACHADO EN JARDINERAS Y SARDINELES
VESTIDURA DE DERRAMES CON MEZCLA C:A 1:4 E(min)
TARRAJEO CON IMPERMEABILIZANTES EN INTERIOR DE
TARRAJEO EN APOYO T.E. y COBERTURA PATIO
CIELORRASOS
CIELORRASOS CON MEZCLA C:A 1:4 - E(min) = 1.5 cm.
PISOS Y PAVIMENTOS
CONTRAPISO DE 50 mm
PISOS DE CERAMICA COLOR ALTO TRANSITO, PEI = 5

m3
m2
kg

37.33
499.32
7,634.73

345.21
33.26
4.20

m3
m2
kg

30.51
145.72
6,687.11

321.31
34.45
4.20

m3
m2
kg
u

46.62
554.97
3,798.98
4,578.50

320.69
30.30
4.20
2.13

m3
m2
kg

7.18
23.00
467.74

362.66
32.51
4.20

m3
m2
kg

5.28
52.93
928.70

350.88
30.08
4.20

m3
m2
kg

0.32
3.64
51.52

310.20
30.08
4.20

m3
m2
kg

8.94
48.11
298.25

293.67
38.81
4.20

m3
m2
kg

11.55
45.79
189.81

286.11
34.93
4.20

m3
m2

0.83
6.56

316.84
34.93

m2
m2
m2

211.29
427.76
6.82

67.67
46.14
36.48

Und.

Metrado

Precio S/.

m2
m2
m2
m
m2
m2

446.35
1,427.13
15.82
770.42
38.11
52.93

15.85
19.56
17.38
9.25
20.07
19.56

m2

625.37

26.70

m2
m2

628.03
699.61

17.43
47.58

03.03
04
04.01
04.02
05
05.01
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
08
08.01
08.02
08.03
08.04
08.05
08.06
09
09.01
09.02
09.03
09.04
09.05
09.06
10
10.01
10.02
11
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
12
12.01
12.02
12.03
12.04
13
13.01
13.02
13.03
13.04
13.05

PISOS DE PORCELANATO, COLOR, ALTO TRANSITO, PEI =


CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO EN EXTRIORES,
CONTRAZOCALO DE CERAMICA EN INTERIORES, H = 0.20
ZOCALOS
ZOCALO DE CERAMICA COLOR, ALTO TRANSITO, PEI = 5,
REVESTIMIENTO DE GRADAS, ESCALERAS y OTROS
REVESTIMIENTO MESAS DE C A PORCELANATO
REVESTIMIENTO BORDES DE JARDINERAS Y
REVESTIMIENTO DE GRADAS CON CERMICO
CARPINTERIA DE MADERA

m2

352.15

74.41

m
m

104.75
288.00

11.37
10.33

m2

446.35

48.16

m2
m
m2

3.95
32.45
19.43

86.34
81.64
57.14

PUERTAS EXTERIORES DE MADERA CEDRO NACIONAL, CON


TABLEROS,
Segn lo indicado
en detalle
de planos
PUERTAS INTERIORES
ss hh DE
MADERA
CEDRO NACIONAL,
CON TABLEROS,
lo indicado
en detalle
de planos
VENTANAS
BAJASSegn
DE MADERA
CEDRO
NACIONAL,
CON
SEGURIDAD,
Segn
lo
indicado
en
los
detalles
y
planos
VENTANAS ALTAS DE MADERA CEDRO NACIONAL, CON
SEGURIDAD,
Segn
lo indicado en los detalles y planos
CARPINTERIA
METALICA

m2
m2
m2
m2

76.55
13.43
116.61
24.45

390.84
209.31
197.32
217.23

PUERTA METALICA EN INGRESO PRINCIPAL


PUERTA METALICA EN INGRESO SECUNDARIO
BARRA PARA DISCAPACITADOS EN SS HH
BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn
BARANDA DE PROTECCION EN ESCENARIO, Segn Diseo
BARANDA DE PROTECCIN EN ADMINISTRACIN, Segn
CERRAJERIA

u
u
u
glb
glb
m

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
98.60
185.00
185.00
185.00

u
BISAGRA ALUMINIZADA PESADA DE 5" PARA PUERTAS DE
u
u
BISAGRA ALUMINIZADA PESADA DE 3" PARA PUERTAS EN
JALADORES DE BRONCE DE 4" PARA PUERTAS DE
u
JALADORES DE BRONCE DE 3" PARA PUERTAS
u
CERROJOS DE BRONCE PARA PUERTAS INTERIORES DE
u
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS DOBLES NACIONALES
p2
ESPEJOS DE 6 mm CRISTAL IMPORTADO EN SS HH
p2
PINTURA
PINTURA EN MUROS Y COLUMNAS, LATEX DOS MANOS, Superm m2
PINTURA EN CIELORASOS Y VIGAS, LATEX DOS MANOS,
m2
PINTURA EN JARDINERAS y SARDINELES, OLEO DOS
m2
PINTURA EN PUERTAS CON BARNIZ MARINO, DOS MANOS
m2
PINTURA EN VENTANAS DE MADERA CON BARNIZ
m2
PINTURA EN ESTRUCTURAS METALICAS DE TECHO, DOS MAN m2
PINTURA EN COBERTURA DE JUEGOS INFANTILES
m2
PINTURA EN BARANDAS METALICAS DE PROTECCION
m
PINTURA EN PUERTAS METALICAS, DOS MANOS, CON
m2
COBERTURA METALICA EN PATIO
TIJERALES ACERO CORRUGADO COBERTURA PATIO,
u
CERCHA SECUNDARIA COBERTURA PATIO PRINCIPAL,
u
COBERTURA EN PATIO PRINCIPAL CON PLANCHAS DE CALAMINAm2
SUSTITUCION DE PLANCHAS DETERIORADAS COBERTURA PATIOm2
COBERTURA EN ZONA DE JUEGOS
EXCAVACION PARA DADOS ANCLAJE COLUMNAS DE
u
COLUMNAS DE TUBOS DE ACERO, Diametro = 6", Espesor =
u
DADOS DE C f'c = 175 Kg/cm2 ANCLAJE DE COLUMNAS DE
u
CERCHAS PRINCIPALES CON TUBOS DE ACERO DE 1", 3/4" y 1/2 m
CERCHAS SECUNDARIAS CON TUBO DE ACERO, Diametro
m

39.00
156.00
39.00
39.00
13.00
13.00

93.16
8.47
7.67
8.27
6.77
7.17

1,213.12
178.77

6.53
10.51

1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63

9.54
8.96
8.38
33.79
19.88
26.76
9.32
11.01
33.39

2.00
9.00
66.55
45.00

1,250.00
220.40
27.66
30.32

16.00
16.00
16.00
67.20
219.38

27.02
600.45
100.39
99.75
67.07

CERRADURA PESADA DE SOBREPONER DE TRES GOLPES EN PUERTAS


DE MADERA, CANTOL PESADA O SIMILAR

13.06
14
14.01
14.02
14.03
15
15.01
15.02
15.03
15.04
16
16.01
16.02
16.03

COBERTURA DE POLICARBONATO TRASLUCUDO, Espesor


GRAS SINTETICO
CORTE Y NIVELACION EN TERRENO NATURAL
BASE COMPACTADA CON MATERIAL FILTRANTE SELECCIO
GRAS SINTETICO EN ZONA DE JUEGOS INFANTILES
JUEGOS INFANTILES
TROMPO SEGUN DISEO
SUBE Y BAJA SEGUN DISEO
COLUMPIOS SEGUN DISEO
TOBOGAN SEGUN DISEO
VARIOS
BASUREROS DE FIBRA DE VIDRIO, Segn modelo
REJILLA DE PERFILES DE ACERO PARA CANALETA DE
JUNTAS DE CONSTRUCCION CON TEKNOPORT DE 1"

003

INSTALACIONES SANITARIAS

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
02.11
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
04
04.01
04.02
04.03
04.04
04.05

Descripcin
APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE BAJO ADULTOS - COLOR
INODORO TANQUE BAJO NIOS - COLOR
LAVATORIOS CON PEDESTAL - COLOR
OVALINES DE COLOR EN MESAS DE C A
URINARIO DE LOZA ACADEMY - COLOR - PARA ADULTOS
PAPELERA DE LOZA DE COLOR DE 15 X 15 cm
JABONERAS DE PARED DE POLICARBONATO
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE PARA VENTILACION EN PVC
SALIDA DE DESAGUE EN PVC DE 4"
SALIDA DE DESAGUE EN PVC DE 2"
TUBERIA DE PVC SAL 4"
TUBERIAS DE PVC SAL 6"
SUMIDERO CROMADO DE 2"
REGISTRO CROMADO DE 4"
CAJA DE REGISTRO 12" x 24" CON MARCO Y TAPA
EXCAVACION DE ZANJAS PARA TUBERIAS Y CAJAS DE
CAMA DE ARENA PARA ZANJAS DE TUBERIAS DE
DESAGUE
H=0.10 m.
RELLENO COMPACTADO
CON MATERIAL PROPIO EN
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA PVC- SAP C-10
RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP - C-10
VALVULAS DE PASE Cim PESADA O SIMILAR DE 1/2"
SUMINISTRO E INSTALACION DE SISTEMA DE IMPULSION
SUMINISTRO E INSTALACION DE VALVULA FLOTADORA DE
SUMINISTRO E INSTALACION DE TANQUE ELEVADO DE POL
SUMINISTRO E INSTALACION DE EQUIPO DE REBOSE Y
EQUIPO DE BOMBEO DE AGUA CON ELECTROBOMBA Y
EXCAVACION ZANJAS TUBERIA DE AGUA
RELLENO COMPACTADO CON MATERIAL PROPIO EN
CASETA PARA ELECTROBOMBA
CONCRETO f'c = 175 Kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL PARA CASETAS
ACERO DE REFUERZO Fy = 4200 Kg/cm2 GRADO 60 PARA
TARRAJEO CON IMPERMEABILIZANTE PARA CASETAS DE
PINTURA DOS MANOS SELLADOR Y ESMALTE O SIMILAR

m2

207.27

41.82

m2
m2
m2

200.10
200.10
200.10

4.43
7.62
104.14

u
u
u
u

1.00
1.00
1.00
1.00

1,250.00
1,400.00
1,500.00
1,460.60

u
m
m

2.00
9.00
82.90

660.00
125.00
8.07

Und.

Metrado

Precio S/.

u
u
u
u
u
pza
u

7.00
12.00
14.00
6.00
2.00
19.00
20.00

255.55
245.55
190.45
181.16
181.04
19.91
26.31

pto
pto
pto
m
m
pza
u
pza
m
m
m

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

48.25
50.37
43.79
8.19
11.14
27.76
29.85
94.77
9.00
2.82
10.74

pto
m
pza
glb
u
u
glb
glb
m
m

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

44.04
8.39
55.62
340.23
48.64
469.68
255.82
1,177.34
9.00
10.74

m3
m2
kg
m2
m2

0.75
3.96
36.80
4.92
4.92

283.72
30.08
4.25
19.56
5.12

04.06

REJA DE PROTECCION PARA CASETA ELECTROBOMBA, IN

004

INSTALACIONES ELECTRICAS

Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
05
05.01
05.02
05.03

Descripcin
Und.
INSTALACIONES ELECTRICAS
SALIDAS EN TECHOS PARA CENTROS DE LUZ
pto
SALIDA DE PARED (BRAQUETES) CON PVC
pto
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON
pto
SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A
pto
SALIDAS PARA LUZ DE EMERGENCIA EN PARED
pto
SALIDA PARA ELECTROBOMBA
pto
POZOS PUESTA A TIERRA PARA TABLEROS DE
u
ARTEFACTOS Y LUMINARIAS
ARTEFACTO FLUORSCENTE 4 x 22 W Incluye Equipo y
u
ARTEFACTO FLUORESCENTE 2 x 40 W Incluye Equipo y
u
ARTFACTO FLUORESCENTE CIRCULAR DE 32 W PHILIPS
u
BRAQUETE CON LUMINARIA AHORRADORA DE 42 W
u
LUMINARIAS ISLA LED 70 W hm
u
LUMINARIA CIRCULAR DE 150 W, ADOSADO, INCLUYE PANTA
u
POSTES PARA LUMINARIAS
POSTES PARA LUMINARIAS ISLA LED 70 W hm DE ACERO ESTRU u
CONDUCTORES, CABLES Y DUCTOS
CABLE NYY 1 KV 2 x 25 mm2 + 1 x 6 mm2, Suministro e
m
CABLE NYY 1 KV 2 x 16 mm2 x 1 x 6 mm2, Suministro e
m
CABLE NYY 1 KV 2 x 6 mm2 + 1 x 6 mm2, Suministro e
m
CAJA DE PASO METALICA DE 6" x 6" x 4" Con Tapa
u
CAJAS DE DISTRIBUCION F-1
u
CAJAS DE F G PARA MEDIDOR ELECTRICO
u
EXCAVACION DE ZANJAS PARA REDES ELECTRICAS, ANCHO = m
RELLENO ZANJAS CABLES ELECTRICOS CON LADRILLO Y
m
TABLEROS DE DISTRIBUCION
TABLERO GENERAL (T G) CON GABINETE METALICO
u
TABLERO DE DISTRIBUCION - GABINETE METALICO
u
TABLERO DE DISTRIBUCION PARA ELECTROBOMBA
u

Total costo directo


Gastos generales fijos
Gastos generales variables
Utilidad

Sub Total
IGV

Total
Porcentaje de Avance

glb

1.00
Metrado

142.50
Precio S/.

108.00
2.00
6.00
27.00
3.00
1.00
2.00

39.91
43.15
51.29
52.92
31.40
38.19
932.65

65.00
15.00
28.00
2.00
3.00
12.00

134.27
108.53
53.31
31.88
4,654.10
318.17

3.00

920.00

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

26.09
23.36
15.72
20.72
269.79
109.71
8.65
15.46

1.00
6.00
1.00

236.33
318.43
154.67

VALORIZACION AL 25%
ANTERIOR
METRADO

VALORIZADO
(S/.)

ACTUAL
METRADO

377,977.76
Parcial S/.
3,473.34
592.24
881.10
2,000.00
2,878.94
1,577.59
1,301.35
28,007.95
1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05
16,320.20
2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94
84,956.94
1,338.08
19,003.63
26,567.61
6,371.20
10,319.94
9,876.47
38,047.62
2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36
208,056.75
16,457.43
11,726.55
4,730.88
4,631.08
1,453.07
3,178.01
61,559.94

ACUMULADO

VALORIZADO
(S/.)

METRADO

0.00

VALORIZADO
(S/.)

377,977.76

1.00
1.00
4.00

592.24
881.10
2,000.00

0.00
0.00
0.00

0.00
0.00
0.00

1.00
1.00
4.00

592.24
881.10
2,000.00

100%
100%
100%

1,772.57
1.00

1,577.59
1,301.35

0.00
0.00

0.00
0.00

1,772.57
1.00

1,577.59
1,301.35

100%
100%

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

277.56
11.00
18.00
5.00
14.00
277.56
798.84
79.88

1,479.39
310.53
508.14
94.10
263.48
11,063.54
12,589.72
1,699.05

100%
100%
100%
100%
100%
100%
100%
100%

89.66
200.94
16.85
7.00
141.58
483.43
172.87

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

89.66
200.94
16.85
7.00
141.58
483.43
172.87

2,422.61
5,429.40
520.33
189.14
2,612.15
1,469.63
3,676.94

100%
100%
100%
100%
100%
100%
100%

73.40
126.86

1,338.08
19,003.63

0.00
0.00

0.00
0.00

73.40
126.86

1,338.08
19,003.63

100%
100%

30.41
349.71
483.43

6,371.20
10,319.94
9,876.47

0.00
0.00
0.00

0.00
0.00
0.00

30.41
349.71
483.43

6,371.20
10,319.94
9,876.47

100%
100%
100%

717.55
717.55
119.99
176.00
421.56
717.55
57.40

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

717.55
717.55
119.99
176.00
421.56
717.55
57.40

2,238.76
6,257.04
4,905.19
7,260.00
16,558.88
588.39
239.36

100%
100%
100%
100%
100%
100%
100%

38.42
1,126.40

11,726.55
4,730.88

0.00
0.00

0.00
0.00

38.42
1,126.40

11,726.55
4,730.88

100%
100%

4.54
756.67

1,453.07
3,178.01

0.00
0.00
0.00

0.00
0.00

4.54
756.67

1,453.07
3,178.01

100%
100%

12,886.69
16,607.38
32,065.87
42,909.08
9,803.17
5,020.05
28,085.86
57,474.09
14,950.57
16,815.59
15,955.72
9,752.21
5,316.14
2,603.90
747.73
1,964.51
7,345.32
1,852.65
1,592.13
3,900.54
425.13
99.26
109.49
216.38
5,745.21
2,625.41
1,867.15
1,252.65
5,701.21
3,304.57
1,599.44
797.20
492.12
262.98
229.14
34,283.63
14,297.99
19,736.85
248.79

37.33
499.32
7,634.73

12,886.69
16,607.38
32,065.87

30.51
145.72
6,687.11

9,803.17
5,020.05
28,085.86

46.62
554.97
3,798.98
4,578.50

14,950.57
16,815.59
15,955.72
9,752.21

7.18
23.00
467.74

2,603.90
747.73
1,964.51

5.28
52.93
928.70

1,852.65
1,592.13
3,900.54

0.32
3.64
51.52

99.26
109.49
216.38

8.94
48.11
298.25

2,625.41
1,867.15
1,252.65

11.55
45.79
189.81

3,304.57
1,599.44
797.20

0.83
6.56

262.98
229.14

211.29
427.76
6.82

14,297.99
19,736.85
248.79

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

37.33
499.32
7,634.73

12,886.69
16,607.38
32,065.87

100%
100%
100%

0.00
0.00
0.00

30.51
145.72
6,687.11

9,803.17
5,020.05
28,085.86

100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

46.62
554.97
3,798.98
4,578.50

14,950.57
16,815.59
15,955.72
9,752.21

100%
100%
100%
100%

0.00
0.00
0.00

7.18
23.00
467.74

2,603.90
747.73
1,964.51

100%
100%
100%

0.00
0.00
0.00

5.28
52.93
928.70

1,852.65
1,592.13
3,900.54

100%
100%
100%

0.00
0.00
0.00

0.32
3.64
51.52

99.26
109.49
216.38

100%
100%
100%

0.00
0.00
0.00

8.94
48.11
298.25

2,625.41
1,867.15
1,252.65

100%
100%
100%

0.00
0.00
0.00

11.55
45.79
189.81

3,304.57
1,599.44
797.20

100%
100%
100%

0.00
0.00

0.83
6.56

262.98
229.14

100%
100%

0.00
0.00
0.00

211.29
427.76
6.82

14,297.99
19,736.85
248.79

100%
100%
100%

241,533.74
Parcial S/.
44,190.83
7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31
16,697.38
16,697.38
70,437.48
10,946.56
33,287.44

129,532.23

371,066.06

446.35
1,427.13
15.82
770.42
38.11
52.93

7,074.65
27,914.66
274.95
7,126.30
764.87
1,035.31

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

446.35
1,427.13
15.82
770.42
38.11
52.93

7,074.65
27,914.66
274.95
7,126.39
764.87
1,035.31

100%
100%
100%
100%
100%
100%

625.37

16,697.38

0.00

625.37

16,697.38

100%

628.03
699.61

10,946.56
33,287.44

0.00
0.00
0.00
0.00

0.00
0.00

628.03
699.61

10,946.56
33,287.44

100%
100%

26,203.48
4,166.05
1,191.01
2,975.04
21,496.22
21,496.22
4,100.49
341.04
2,649.22
1,110.23
61,050.59
29,918.80
2,811.03
23,009.49
5,311.27
5,779.40
2,500.00
850.00
394.40
185.00
370.00
1,480.00
5,757.44
3,633.24
1,321.32
299.13
322.53
88.01
93.21
9,800.54
7,921.67
1,878.87
46,195.84
15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79
7,688.77
2,500.00
1,983.60
1,840.77
1,364.40
41,730.81
432.32
9,607.20
1,606.24
6,703.20
14,713.82

352.15

26,203.48

0.00

0.00

352.15

26,203.48

100%

104.75
288.00

1,191.01
2,975.04

0.00
0.00

0.00
0.00

104.75
288.00

1,191.01
2,975.04

100%
100%

446.35

21,496.22

0.00

0.00

446.35

21,496.22

100%

3.95
32.45
19.43

341.04
2,649.22
1,110.23

0.00
0.00
0.00

0.00
0.00
0.00

3.95
32.45
19.43

341.04
2,649.22
1,110.23

100%
100%
100%

76.55
13.43
116.61
24.45

29,918.80
2,811.03
23,009.49
5,311.27

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

76.55
13.43
116.61
24.45

29,918.80
2,811.03
23,009.49
5,311.27

100%
100%
100%
100%

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
394.40
185.00
370.00
1,480.00

0.00
0.00
0.00
0.00
0.00
0.00

1.00
1.00
4.00
1.00
2.00
8.00

2,500.00
850.00
394.40
185.00
370.00
1,480.00

100%
100%
100%
100%
100%
100%

39.00
156.00
39.00
39.00
13.00
13.00

3,633.24
1,321.32
299.13
322.53
88.01
93.21

0.00
0.00
0.00
0.00
0.00
0.00

39.00
156.00
39.00
39.00
13.00
13.00

3,633.24
1,321.32
299.13
322.53
88.01
93.21

100%
100%
100%
100%
100%
100%

1,203.36
0.00

7,857.94
0.00

63.73
1,878.87

1,213.12
178.77

7,921.67
1,878.87

100%
100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79

1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63

15,539.52
5,603.32
132.57
6,080.85
5,608.55
10,449.78
1,821.97
103.49
855.79

100%
100%
100%
100%
100%
100%
100%
100%
100%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

2,500.00
1,983.60
1,840.77
1,364.40

2.00
9.00
66.55
45.00

2,500.00
1,983.60
1,840.77
1,364.40

100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.76
178.77
0.00
1,628.88
625.37
15.82
179.96
282.12
390.50
195.49
9.40
25.63
0.00
2.00
9.00
66.55
45.00
0.00
16.00
16.00
16.00
67.20
219.38

432.32
9,607.20
1,606.24
6,703.20
14,713.82

16.00
16.00
16.00
67.20
219.38

432.32
9,607.20
1,606.24
6,703.20
14,713.82

100%
100%
100%
100%
100%

8,668.03
23,249.61
886.44
1,524.76
20,838.41
5,610.60
1,250.00
1,400.00
1,500.00
1,460.60
3,114.00
1,320.00
1,125.00
669.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

207.27
0.00
200.10
200.10
200.10
0.00
1.00
1.00
1.00
1.00
0.00
2.00
9.00
82.90

0.00
Parcial S/.
9,755.28
1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20
9,288.88
530.75
957.03
963.38
403.77
1,196.51
416.40
447.75
852.93
1,433.61
433.97
1,652.78
8,752.81
2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30
752.24
212.79
119.12
156.40
96.24
25.19

8,668.03

207.27

8,668.03

100%

886.44
1,524.76
20,838.41

200.10
200.10
200.10

886.44
1,524.76
20,838.41

100%
100%
100%

1,250.00
1,400.00
1,500.00
1,460.60

1.00
1.00
1.00
1.00

1,250.00
1,400.00
1,500.00
1,460.60

100%
100%
100%
100%

1,320.00
1,125.00
669.00

2.00
9.00
82.90

1,320.00
1,125.00
669.00

100%
100%
100%

28,517.82

28,517.82

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

7.00
12.00
14.00
6.00
2.00
19.00
20.00

1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20

7.00
12.00
14.00
6.00
2.00
19.00
20.00

1,788.85
2,946.60
2,666.30
1,086.96
362.08
378.29
526.20

100%
100%
100%
100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

530.75
957.03
963.38
403.77
1,165.13
416.40
447.75
852.93
1,433.61
433.97
1,652.78

11.00
19.00
22.00
49.30
104.59
15.00
15.00
9.00
159.29
153.89
153.89

530.75
957.03
963.38
403.77
1,165.13
416.40
447.75
852.93
1,433.61
433.97
1,652.78

100%
100%
100%
100%
97%
100%
100%
100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30

49.00
125.54
13.00
1.00
2.00
1.00
1.00
1.00
125.54
125.54

2,157.96
1,053.28
723.06
340.23
97.28
469.68
255.82
1,177.34
1,129.86
1,348.30

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.75
3.96
36.80
4.92
4.92

212.79
119.12
156.40
96.24
25.19

0.75
3.96
36.80
4.92
4.92

212.79
119.12
156.40
96.24
25.19

100%
100%
100%
100%
100%

142.50

0.00

0.00

1.00

0.00
Parcial S/.
8,130.85
4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30
29,692.28
8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04
2,760.00
2,760.00
5,537.73
635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08
2,301.58
236.33
1,910.58
154.67

142.50

1.00

48,422.46

142.50

100%

48,422.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

108.00
2.00
6.00
27.00
3.00
1.00
2.00

4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30

108.00
2.00
6.00
27.00
3.00
1.00
2.00

4,310.28
86.30
307.74
1,428.84
94.20
38.19
1,865.30

100%
100%
100%
100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

65.00
15.00
28.00
2.00
3.00
12.00

8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04

65.00
15.00
28.00
2.00
3.00
12.00

8,727.55
1,627.95
1,492.68
63.76
13,962.30
3,818.04

100%
100%
100%
100%
100%
100%

0.00

0.00

3.00

2,760.00

3.00

2,760.00

100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08

24.37
60.79
26.20
11.00
1.00
1.00
102.14
102.14

635.81
1,420.05
411.86
227.92
269.79
109.71
883.51
1,579.08

100%
100%
100%
100%
100%
100%
100%
100%

0.00
0.00
0.00

0.00
0.00
0.00

1.00
6.00
1.00

236.33
1,910.58
154.67

1.00
6.00
1.00

236.33
1,910.58
154.67

100%
100%
100%

826015

619,511.50

206,472.51

825,984.10

41300.7725
41300.7725
41300.7725
949917.77
170985.198
1120902.97

30,975.58
30,975.58
30,975.58
712,438.23
128,238.88
840,677.11
75%

10,323.63
10,323.63
10,323.63
237,443.39
42,739.81
280,183.19
25%

41,299.21
41,299.21
41,299.21
949,881.72
170,978.71
1,120,860.42
100%

SALDO
METRADO

VALORIZADO
(S/.)

-0.01
0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

-0.01
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00

0.00

0%

0.00
0.00

0.00
0.00

0%
0%

0.00

0.00

0%

0.00
0.00

0.00
0.00

0%
0%

0.00

0.00

0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00
0.00

0.00
0.00

0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%

0.00

0.00

0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

31.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
31.38
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%

0.00

0.00

0%

-0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%

0.00

0.00

0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0%
0%
0%

31.35
1.57
1.57
1.57
36.05
6.49
42.54
0%

CALENDARIO VALORIZADO MENSUAL - RESUMEN


Obra

Propietario
Proyectista
Ubicacin
ITEM

"MEJORAMIENTO DEL SERVICIO EDUCATRIVO EN LA I. E. JESUS NAZARENO N 1560


C. P. SANTA VERNICA, DISTRITO DE LA ESPERANZA - TRUJILLO - LA LIBERTAD"
I ETAPA - CONSTRUCCION DE INFRAESTRUCTURA
MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
Ing. JOSE CHAVEZ RIOS
LA ESPERANZA, TRUJILLO

SUB PRESUPUESTO

001

ESTRUCTURAS

002

MES 01

MES 02

MES 03

MES 04

INVERSION
TOTAL

165,203.08

206,503.70

6,270.99

0.00

377,977.76

ARQUITECTURA

0.00

0.00

241,533.82

129,532.23

371,066.05

003

INSTALACIONES SANITARIAS

0.00

0.00

0.00

28,549.21

28,549.21

004

INSTALACIONES ELECTRICAS

0.00

0.00

0.00

48,422.46

48,422.46

165,203.08

206,503.70

247,804.81

206,503.90

826,015.49

T O TAL

M ENSUAL