Professional Documents
Culture Documents
F'c=
210.00 Kg/cm2
Fy=
4,200.00 Kg/cm2
SOBRECARGA=
400 Kg/m2
PESO ACABADO=
100 Kg/m2
LONGITUD TOTAL= L =
3.95 Mt.
TRAMO a=
2.3 Mt.
TRAMO b=
1.65 Mt.
PASO= P =
0.25 Mt.
CONTRAP.= C =
0.170 Mt.
Wua
t = L/25
0.20 Asuminos=
0.2 Mt.
cos =
P2 +C 2
cos =
te =
0.83
0.33 m
0.40 Ton/m
Wl=
0.40 Ton/m
2.33 Ton/m
0.48
0.10
0.19
0.77
Sobrecarga=
0.40 Ton/m
Wl=
Ton/m
Ton/m
Ton/m
Ton/m
0.40 Ton/m
Wub
b
espesor equivalente
base=
100 Cm.
1.88 Ton/m
Wua
4.90 Ton.
3.57 Ton.
8.47
Wub
b
a
R1
R2
Vx = R1 - Wua x
Si hacemos que Vx = dMx / dx =0, se obtiene la distancia donde se produce el momento mximo
Para X=
Mt. Mumax=
Para d=
2.10 m
Reemplazando en A:
5.13 Ton-m
17.21 cm
Vd=
4.49 Ton
3.0 DISEO
Acero por temperatura ( Acero transversal)
Ast=
3.10 cm2/ml
3/8" cada
41.7 Tomamos:
25 Cm.
5.13 Ton-m.
0.097
8.37 cm2
4.16 cm2
1/2" cada
15.4 Tomamos:
15 Cm.
4.19 Cm2
1/2" cada
30.8 Tomamos:
25 Cm.
BIEN vc>vd
ACERO
DES
1/4"
8 mm
3/8"
12 mm
1/2"
5/8"
3/4"
1"
1 3/8"
AREA
0.282
0.5
0.71
1.13
1.29
2
2.84
5.1
10.06
PESO
0.22
0.4
0.56
0.89
0.99
1.55
2.24
3.97
7.91
Pgina 3