Professional Documents
Culture Documents
Soontak LEE
Professor of civil and Hydrosystems Engineering
Dean, Graduate School of Industrial Sc. & Tech.
Yeungnam University
Daegu 712-749, Korea
Main objectives
! To improve the engineering capability for dam-break flow
analysis and prediction on real complex situations
! To develop methodologies and guidelines for dam-break flood
risk management in Nakdong River, Korea, as a first step
toward a new integrated flood safety system based on structural
and non-structural measures
! To create a new concept for operational crisis control and
integrated dam safety management
DRL
IA
ED
DM
AN
ION
AT
N
TIO ITS
ICIP
RT
MA EF
PA
OR EN
IC
INF CAL B
BL
PU
LO
CO
NST
RA
INT
SA
ND
RE
SAF
GU
E
LAT
OP DE
ERA SIG
ION
S
TIO N A
N
ND
DAM OWNERS
SOCIETY BENEFITS
BETTER PROTECTION
PUBLIC PARTICIPATION AND MEDIA
AUTHORITIES
PUBLIC
UNDERSTAND
UNDERSTAND
informing
without alarming
People living in
Sociological, demographic
and housing knowledge
SocioSocio - geographical
SocioSocio -structural
Diagnoses of vulnerabilities
Local authorities
disaster support institutions
Socio
Socioocio -demographic
SocioSocio -cognitive
AIMS
AIMS
Promote acceptability and viability
of warning systems against spillways
And dam break risk
Guarantee the efficiency of emergency plans
in case of dam break
Andong Dam
Dalji
Imha Dam
Andong
Sabeol
operation
Youngcheon Dam
Goryeunggyo
Unmun Dam
Milryang Dam
Hapcheon Dam
Jeokpogyo
Namgang Dam
Jindong
Samrangjin
Gupo
Estuary
Estuary
barrage
Andong
Imha
Hapcheon
Namgang
Milryang
Yeungcheon
Unmun
ECRD
ECRD
CG
CFRD
CFRD
ECRD
ECRD
Dam height(m)
83.0
73.0
96.0
34.0
89.0
42.0
55.0
Total storage
capacity(106m3)
1,248.0
595.0
790.0
309.2
73.6
96.4
135.3
9,913.0
9,362.0
8,984.0
14,892.0
3,054.0
2,959.0
7,594.0
Reservoir area in
HWL(km2)
60.0
31.0
30.3
53.0
2.5
7.2
7.8
612.0
515.0
472.0
1,126.5
535.0
300.0
407.0
8.0
10.0
10.0
7.5
10.0
10.0
10.0
2.0
2.2
0.1
1.5
1.4
2.7
2.2
1.7
1.8
0.8
1.5
1.4
2.0
1.8
0.18
0.25
0.25
0.30
0.20
0.20
Dam foundation
width(m)
200.0
200.0
75.0
135.0
230.0
160.0
138.0
Index
Dam type
Models used :
! Parametric model (DAMBRK model)
! Physical - parametric model (BREACH model)
Andong
Imha
Hapcheon
Namgang
Milryang
Yeungcheon
Unmun
BREACH
92,964
78,749
20,522
51,327
BREACH + DAMBRK
105,598
79,143
26,609
38,778
55.3
48.3
61.0
17.0
59.3
28.0
36.7
1.0
154,159
108,423
(0.1hr)
94,686
(0.1hr)
23,667
(0.1hr)
159,000
25,717
42,596
2.0
145,645
98,959
(0.2hr)
94,206
(0.2hr)
23,716
(0.2hr)
129,723
22,717
37,291
3.0
137,568
90,088
(1.0hr)
24,063
(1.0hr)
40,345
20,094
32,017
110.7
97.7
122.0
34.0
118.7
56.0
73.3
1.0
221,818
145,400
(0.1hr)
148,682
(0.1hr)
35,690
(0.1hr)
217,403
35,133
58,556
2.0
204,309
125,153
(0.2hr)
146,321
(0.2hr)
35,653
(0.2hr)
163,388
29,173
47,116
3.0
187,839
106,580
(1.0hr)
35,343
(1.0hr)
43,494
24,027
37,145
166.0
146.0
183.0
68.0
178.0
84.0
110.0
1.0
283,917
166,193
(0.1hr)
280,616
(0.1hr)
48,907
(0.1hr)
263,248
43,528
72,551
2.0
254,371
135,274
(0.2hr)
276,699
(0.2hr)
47,660
(0.2hr)
184,169
33,580
53,231
3.0
226,701
113,929
(1.0hr)
46,589
(1.0hr)
45,512
25,808
39,129
Model
Bavr
Bb(m)
T(hr)
1Hd
Bavr
Bb(m)
T(hr)
DAMBRK
2Hd
Bavr
3Hd
Bb(m)
T(hr)
100, 000
P e a k Outf lo w(m / s )
1, 000, 000
10, 000
1, 000
1. E+06
1. E+07
1. E+08
1. E+09
1. E+10
1. E+11
4
1. E+12
L = 612.0m
EL. 166.0m
Bt = 332.0m
EL. 151.0m
1:1
Bb = 166.0m
83.0m
L = 515.0m
Bt = 292.0m
EL. 151.0m
1:1
Bb = 146.0m
EL. 168.0m
1:1
73.0m
L = 472.0m
EL. 181.0m
Bt = 183.0 m
EL.166.0m
Bb = 183.0 m
96.0m
300,000
Dis c ha rg e (m3 / s e c )
250,000
200,000
50,000
0
0.00
1.00
2.00
3.00
4.00
5.00
Time (hr)
6.00
7.00
8.00
9.00
10.00
TIN composition
Dam-break scenarios
The following three scenarios were assumed :
! Sc-A : Single dam-break
! Sc-B : Two dam-break (Andong + Imha)
! Sc-C : Three dam-break (Andong + Imha + Hapcheon)
Andong dam
Dalji
Imha dam
Andong
Sabeol
Nakdong
Gumi
Youngcheon dam
Goryeunggyo
Unmun dam
Hapcheon dam
Namgang dam
Jeokpogyo
Jindong
Milryang dam
Samrangjin
Gupo
Estuary barrage
Imha dam
Hapcheon dam
Andong dam
Hwang river
Nakdong river
Peak
Discharge(m3/sec)
Max.
flood W.L.(EL.m)
Flood wave
arrival time(hr)
Andong dam
283,917
141.16
0.00
0.00
Andong
175,584
116.19
0.25
1.05
Sabeol
69,408
68.31
2.63
5.47
Ilseongyo
64,890
45.00
4.38
8.42
Gumi
59,081
40.45
5.32
11.82
Waegan
52,721
38.31
5.63
13.10
Goryenggyo
45,711
33.98
7.75
18.98
Jeokpogyo
36,702
24.34
12.23
28.27
Jindong
35,590
17.67
14.30
33.20
Samrangjin
35,313
12.94
22.15
42.30
Gupo
33,324
10.40
23.26
50.60
Estuary barrage
30,441
10.31
23.35
51.02
300,000
Andong dam
Dis c ha rg e ( m / s e c )
250,000
200,000
Andong
Goryenggyo
150,000
Jeokpogyo
Sabeol
Jindong
100,000
Samrangjin
Estuary barrage
50,000
0
20
40
60
80
100
120
140
Andong dam
Sabeol
Jeokpogyo
Jindong
Estuary barrage
Goryenggyo
Peak
Discharge(m3/sec)
Max.
flood W.L.(EL.m)
Flood wave
arrival time(hr)
Andong dam
283,917
142.59
0.00
0.00
Imha dam
166,193
136.76
0.00
0.00
Andong
278,190
122.38
0.72
1.03
Sabeol
105,328
71.59
2.75
4.75
Ilseongyo
93,646
47.96
4.15
7.47
Gumi
81,029
43.00
5.05
10.60
Waegan
69,958
40.78
6.17
11.85
Goryenggyo
59,529
36.34
7.93
18.97
Jeokpogyo
43,816
25.99
12.58
27.80
Jindong
42,605
18.84
14.38
32.33
Samrangjin
41,104
13.60
21.53
42.22
Gupo
38,487
10.67
24.48
51.22
Estuary barrage
34,706
10.57
25.72
51.63
350,000
Andong dam
Andong
D is c h a rg e ( m
/sec)
300,000
250,000
200,000
Imha dam
150,000
Goryenggyo
Jeokpogyo
Sabeol
Jindong
100,000
Samrangjin
Estuary barrage
50,000
0
20
40
60
80
S imu la tio n Time ( h r)
100
120
140
Andong dam
Imha dam
Sabeol
Jeokpogyo
Jindong
Estuary barrage
Goryenggyo
Three dam-break
(Andong + Imha + Hapcheon) simulation
! Andong + Imha + Hapcheon dam-break results by extreme flood (PMF)
Stations
Peak
Discharge(m3/sec)
Max.
flood W.L.(EL.m)
Flood wave
arrival time(hr)
Andong dam
283,917
142.59
0.00
0.00
Imha dam
166,193
136.76
0.00
0.00
Hapcheon dam
148,682
124.15
0.00
0.00
Andong
278,190
122.38
0.72
1.03
Sabeol
105,328
71.59
2.75
4.75
Ilseongyo
93,646
47.96
4.15
7.47
Gumi
81,029
43.00
5.05
10.60
Waegan
69,958
40.78
6.17
11.85
Goryenggyo
59,529
35.93
7.93
18.97
Jeokpogyo
91,259
31.11
10.50
19.15
Jindong
52,062
21.14
18.17
23.90
Samrangjin
66,266
15.32
20.90
31.83
Gupo
50,692
11.67
22.43
41.47
Estuary barrage
49,552
11.52
23.33
41.85
300, 000
Andong dam
Andong
Dis c ha rg e (
m3 / s e c )
250, 000
200, 000
Imha dam
150, 000
Hapcheon dam
Sabeol
Goryenggyo
Jeokpogyo
Jindong
100, 000
Samrangjin
Estuary barrage
50, 000
0
20
40
60
80
100
120
140
Andong dam
Imha dam
Hapcheon dam
Sabeol
Jeokpogyo
Jindong
Estuary barrage
Goryenggyo
Andong dam
Imha dam
Sabeol
Hapcheon dam
Jeokpogyo
Jindong
Estuary barrage
Goryenggyo
Andong dam
Sabeol
Hapcheon dam
Jeokpogyo
Goryenggyo
Jindong
Estuary barrage
Imha dam
Andong dam
Sabeol
Hapcheon dam
Jeokpogyo
Jindong
Estuary barrage
Goryenggyo
Imha dam
Dis c h a rg e ( m3 / s e c )
250,000
200,000
150,000
100,000
50,000
0
0.00
1.00
2.00
3.00
4.00
5.00
Time(hr)
6.00
7.00
8.00
9.00
10.00
EMERGENCY
ACTION
PLANS
For dam-break flood risk management
IEAP
Dams owner
EEAP
Civil Protection
- - - - - - - - - - EEAP
- Authority
(MOCT, KOWACO)
- Dam owner
- Authority
(MOCT, KOWACO)
- Dam owner
- Civil Protection
- Authority
(MOCT, KOWACO)
- Dam owner
- Civil Protection
- Authority
(MOCT, KOWACO)
- Dam owner
- Civil Protection
5. 00
Gumi
Andong
Sabeol
Samrangjin
Gupo
Estuary barrage
10. 00
Waegan
15. 00
Jindong
Goreunggyo
20. 00
Jeokpogyo
Ando ng Dam
0. 00
0
Imha
25. 00
50
100
150
200
250
300
350
Dis ta nc e ( km)
400
Basin vulnerability
Downstream zoning criteria
! Vulnerability
defined as a measure of the level of exposure and of damage
susceptibility toward the dam-break flood
physical vulnerability and socioeconomic vulnerability
should be included for each sub-zone downstream of the dam
Physical vulnerability
should include a quantification of the dam - break flood
impact as a function of variables like the following :
!
Socioeconomic vulnerability
be a weighted function of several characteristics factors :
! Social
families (number of members)
individual (age, education)
! Property
buildings
economic activities
! Strategic infrastructures
power and water networks
hospitals
! Warning and emergency system
! Civil protection response (including training)
! Psycho-social (public perception)
External EAP
! Means and resources allocation
for each vulnerability zone
! Actions of entities involved in crises management
Water organization or authority (Ministries, Institutes)
Civil protection national service
Dam owner or manager
! Action of entities involved in emergency
Civil protection national service
(National disaster prevention organization)
Civil protection agents
Municipalities
! Type of evacuation
by own people means
help of civil protection agents
Information system
DAM INFO
EAP
THANK YOU
FOR
YOUR ATTENTION