STRATHCONA PHASE 1 PROPOSED CONSTRUCTION PLAN - 2015/2016

THE CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS IN


THE FIELD AND REPORT ANY DISCREPANCY TO THE ARCHITECT.

2.

DRAWINGS ARE NOT TO BE SCALED.

3.

ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE


COPYRIGHT PROPERTY OF THE ARCHITECT AND MUST BE RETURNED
UPON REQUEST. REPRODUCTION OF THE DRAWINGS, SPECIFICATIONS
AND RELATED DOCUMENTS IS FORBIDDEN UNLESS PERMITTED IN
WRITING BY THE ARCHITECT.

4.

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS


CLEARLY LABELED "ISSUED FOR CONSTRUCTION" IN THE REVISION
COLUMN.
DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER
CONTRACT DOCUMENTS.

5.
6.

ALL WORK SHALL BE TO THE MOST RECENT BRITISH COLUMBIA


BUILDING CODE STANDARDS AND ALL OTHER
BY-LAWS AND REGULATIONS APPLICABLE TO THE TRADES INVOLVED.

7.

THE CONTRACTOR SHALL CONFINE ACTIVITIES AND STORAGE OF


MATERIALS TO THE AREAS INDICATED ON THE DRAWINGS AND PROTECT
ALL OTHER AREAS OF THE SITE FROM DAMAGE.

8.

THE CONTRACTOR SHALL ACCOMMODATE ACCESS AND SAFETY FOR


THE PUBLIC DURING THE CONSTRUCTION PERIOD, AND SHALL
PROVIDE TEMPORARY HOARDING OR FENCING AS REQUIRED. REFER
TO SPECIFICATIONS FOR DETAILS.

PENDER STREET
40

AUDITORIUM

PRIMARY
BLDG

STAFF
PARKING

STAFF
PARKING
GRAVEL
PLAY
FIELD

SENIOR
BLDG
COMMUNITY
BLDG

JUNIOR
BLDG

HEATLEY AVENUE

JACKSON AVENUE

CHILDCARE

ISSUED FOR BUILDING PERMIT

8 30APRIL2015

90% FOR PRE-TENDER COSTING

7 21APRIL2015

80% PROGRESS SET

1475

21MAY2015

26FEB2015 50% PROGRESS SET- ISSUED FOR COSTING -

48

20

.6
6

CONSTRUCTION ZONE
NO SCHOOL ACCESS

deck

1478
deck

1477

17DEC2014

ISSUED DEVELOPMENT PERMIT

14NOV2014

ISSUED FOR REVIEW

19SEP2014 ISSUED FOR DESIGN DEVELOPMENT REVIEW -

SEPT2014

MAY2014 ISSUED FOR PRELIM DESIGN COST ESTIMATE -

48

.6
7

48

.6
1

20

deck

20

.6
0

1476

UP

20

48

deck

41
99

No

KEEFER STREET

Construction Site plan


1 : 500

DATE

REVISION

BY

CLIENT

PROJECT TITLE

STRATHCONA
SEISMIC UPGRADE
592 E.PENDER ST.,
VANCOUVER

LEGEND
PHASE 1 CONSTRUCTION ZONE
NO SCHOOL ACCESS

ISSUED FOR CONSULTANT REVIEW

PHASE 1 CONSTRUCTION SITE ACCESS


POINTS FOR EQUIPMENT, TRUCKS, ETC.
PHASE 1 CONSTRUCTION PEDESTRIAN
ACCESS FOR CONTRACTOR

SCHOOL ACCESS FROM/ TO SENIOR


BUILDING TO/FROM REST OF CAMPUS

PROPOSED SCHOOL DELIVERIES


ACCESS/ENTRANCE

DESIGNATED STUDENT DROP OFF ZONE

BUILDING ENTRANCE

DRAWING TITLE
ENCOURAGE CLOCKWISE
TRAVEL AROUND SITE
FOR VEHICLES.

Phase 1 Proposed
Construction Plan
2015/2016
MAY 2015

DATE
SCALE

As indicated

DRAWN
REVIEWED

Author

SHEET NO.

A001-1

Checker

CAGP PROJ. NO.

1401

CAD FILENAME

22/05/2015 12:53:09 PM

24x36 PLOT WINDOW

GENERAL NOTES

1.

You might also like