You are on page 1of 5

GRESS PENGAWASAN PEKERJAAN HYDROTEST (

s/d
)
A PEKERJAAN HYDROTEST PT BHATINI MITRA SEJATI TAHUN 2015

PT KOLINDO PERKASA

1
2
3
4

B
1
2
3
4
5
6
7
8
9

C
1
2
3
4
5
6
7
8
9

D
1
2
3
4
5
6
7
8
9

E
1
2

Jadwal Pe

JUMLAH
HARI
KERJA
PLANNING

JUMLAH
HARI
KERJA
ACTUAL

EXTEND
HARI
KERJA

Cleaning
Preparation Cleaning
Pigging Cleaning
Pigging Cleaning
Pigging Cleaning

Filling Water
Preparation Filling Water
Preparation Filling Water
Stand By
Filling Water
Filling Water
Filling Water and Pretest
Preparation Filling Water
Filling Water
Filling Water and Polly Pig Struck

Hydrotest
Pretest Hydrotest - 1
Cek Pipeline (Pressure Droup)
Filling Water
Filling Water
Pretest Hydrotest - 2
Filling Water & Pretest
Hydrotest Holding Time at 510Psi
Hydrotest Holding Time at 510-710Psi
Hydrotest Holding Time at 710Psi

Dewatering and Swabbing


Dewatering and Swabing Pig Stuck
Swabing
Swabing Pig Stuck
Swabing and Filling Water Pig Stuck
Filling Water Pig Stuck
Filling Water Pig Stuck
Swabbing
Pengeluaran Pig Stuck
Swabbing

Purging
Preparation Equipment For Leak Test
Purging (N2)

-1

15

32

17

No

PT BHATINI MITRA JA

URAIAN PEKERJAAN/ TIME SHEET

Aug-15
24

25

26

27

28

29

30

31

X
X
X
X

6
X
X
X
X
X
X
X
X
X

6
X
X

Menyetujui,

Pelaksana

PT Bhatini Mitra Jaya

PT Kolindo Perkasa

PT BHATINI MITRA JAYA

Jadwal Pelaksanaan
November 2014
8

10

11

12

13

14

KETERANGAN
15

16

17

18

19

20

21

22

23

25

26

Pipe UnJoint Areal Aska

Bocor pada material Areal JVC

X
X
X

(Pressure Drop, Ada Kebocoran di BKR)


X
X

Pressure Droup
X
X

(Pressure Droup Masih sesuai batasan toleransi 10% as ASME

X
X

Section (Area Metering to T Joint) Section (Area T Joint To JVC


X
X
X
X
X

Section (Areal ASKA to Maedoh)


X

Cutting Pipe (Areal Brigeston, 5 Unit poly pig, 1 unit Bidy Pig, 3
X

Areal T Joint to Asla

X
X

OGRESS PENGAWASAN PEKERJAAN HYDROTEST (


s/d
)
DA PEKERJAAN HYDROTEST PT BHATINI MITRA SEJATI TAHUN 2015

PT KOLINDO PERKASA

PT BHATINI MITRA JAYA

Jadwal Pelaksanaan
No

A
1
2
3

B
1
2
5

C
1
2
3

D
1
2
3

E
1
2
3

URAIAN PEKERJAAN/ TIME SHEET

JUMLAH
HARI KERJA
PLANNING

Cleaning
Preparation Cleaning
Pigging Cleaning
Pigging Cleaning

Filling Water
Preparation Filling Water
Filling Water
Filling Water

Hydrotest
Preparation for Hydrotest
Pretest Hydrotest
Hydrotest Holding Time at 510Psi

Dewatering and Swabbing


Dewatering
Swabing
Swabing

Purging
Preparation for Purging
Purging (N2)
Purging (N2)

Aug-15
24

25

26

27

28

November 2014
29

30

31

KETERANGAN
6

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67

15
TOTAL TARGET AWAL
KUMULATIF TARGET AWAL

6.67

6.67

6.67

6.67

6.67

6.67

6.67

6.67

6.67

6.67 13.34 20.01 26.68 33.35 40.02 46.69 53.36 60.03

6.67

6.67

100

66.7 73.37 80.04 86.71 93.38 100.05

100

Menyetujui,

Pelaksana

PT Bhatini Mitra Jaya

PT Kolindo Perkasa

6.67

6.67

6.67

6.67

SS PENGAWASAN PEKERJAAN HYDROTEST (


s/d
)
KERJAAN HYDROTEST PT BHATINI MITRA SEJATI TAHUN 2015

PT KOLINDO PERKASA

No

PT BHATINI MITRA JAYA

URAIAN PEKERJAAN/ TIME SHEET

Cleaning

Preparation Cleaning

Pigging Cleaning

Pigging Cleaning

Pigging Cleaning

Filling Water

Preparation Filling Water

Preparation Filling Water

Stand By

Filling Water
Filling Water
Filling Water and Pretest
Preparation Filling Water
Filling Water
Filling Water and Polly Pig Struck

Hydrotest

Pretest Hydrotest - 1

Cek Pipeline (Pressure Droup)

Filling Water

Filling Water
Pretest Hydrotest - 2
Filling Water & Pretest
Hydrotest Holding Time at 510Psi
Hydrotest Holding Time at 510-710Psi
Hydrotest Holding Time at 710Psi

Dewatering and Swabbing

Dewatering and Swabing Pig Stuck

Swabing

Swabing Pig Stuck

Swabing and Filling Water Pig Stuck


Filling Water Pig Stuck
Filling Water Pig Stuck
Swabbing
Pengeluaran Pig Stuck
Swabbing

Purging

Preparation Equipment For Leak Test

Purging (N2)

5
6
7
8

5
6
7
8

5
6
7
8

JUMLAH
HARI
KERJA
ACTUAL

Jadwal Pelaksanaan
Aug-15
24

25

26

27

28

Novem
29

30

31

10

11

3
3
3
3
3

9
X

3
X

3
X

3
3
3
3
3
3
3

9
X

3
X

3
X

3
3
3
3

9
X
X
X

2
X
X
X
32
TOTAL TARGET REAL

KUMULATIF TARGET REAL

12

15

18

21

24

27

30

33

36

39

42

45

48

51

54

57

Menyetujui,

Pelaksana

PT Bhatini Mitra Jaya

PT Kolindo Perkasa

Jadwal Pelaksanaan
November 2014
12

13

14

KETERANGAN
15

16

17

18

19

20

21

22

23

25

26

Pipe UnJoint Areal Aska

Bocor pada material Areal JVC

(Pressure Drop, Ada Kebocoran di BKR)

Pressure Droup
3
3

(Pressure Droup Masih sesuai batasan toleransi 10% as ASME Code)

3
3

Section (Area Metering to T Joint) Section (Area T Joint To JVC)


3
3
3
3
3

Section (Areal ASKA to Maedoh)


3

Cutting Pipe (Areal Brigeston, 5 Unit poly pig, 1 unit Bidy Pig, 3 Unit Foam Pig
3

Areal T Joint to Asla

3
3

60

63

66

69

72

75

78

81

84

87

90

93

96

100