You are on page 1of 23
Piping Engineering Department Guideline Mott MacDonald Consultants (India) Pvt. Lid Piping Department Guideline July 2007 ‘Mott MacDonald Consultant (India) Pvt Ltd Kothari House, CTS NO.185 Off. Andheri - Kurla Road Andheri (East) Mumbai 4000059 Tel: 91-22-3083 5000 Fax; 91-22-2825 3779 Email : rad.A shtikar(@mottmac-india.com Page 1 of 23 Piping Engineering Department Guideline Mott MacDonald Consultants (India) Pvt. Lid Piping Department Guideline Project : Client : MMCT Job No. : Document No. PIP-DG-001 Issue and Revision Record Rev Date Originator Checker Approver Deseription 0 23)7/o4 SN. ah ar PP For Reference ‘This document has been prepared forthe ttl projector named part thereof and should not be relied upon or used for any ‘other project without an independent check being carried out as to its suitability and prior written authority of Mott ‘MacDonald being obtained. Mott MacDonald accepts no responsiblity or liability for the consequence of this document boeing used for a purpose other than the purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or teliance be taken to confirm his agreement to indemnify Mott MacDonald forall loss or damage resulting therefrom. Mott MacDonald aceepts no responsibility or liability for this document to any party other than the person by whom it was commissioned. ‘To the extent that this report is based on information supplied by other parties, Mott MacDonald accepts no liability for any loss or damage suffered by the client, whether contractual or tortious, stemming from any conclusions based on data supplied by partis other than Mott MacDonald and used by Mott MacDonald in preparing this report Page 2 of 23 Piping Engineering Department Guideline “Mott MacDonald Consultants ( India) Pvt. Ltd List of Contents 1 Scope & Purpose 2 Abbreviations 3 Organisation- Piping Group 4 Piping Discipline Working Guide 5 Design Output of Piping Department 6 Activity Assignment 7 Inputs 8 Distribution of deliverables 9 Piping Working File 10 Calculations 11 Project Advise Notes ‘Appendix ~ A : Group Work Instruction for Major Project, ‘Appendix ~ B : Folder Making Procedure Page 10 7 18 18 18 19 au Page 3 0f 23 Piping Engineering Department Guideline Mott MacDonald Consultant (India) Pvt. Lid 1 Scope & Purpose This covers the guideline to exercise control over the generation, checking and approval of all basic and detail engineering activities relating to the Piping Group such that the design output meets the desired quality requirements. The purpose of this document is 1.1 Tolist all outputs to be generated and inputs required by Piping Group, 1.2 Assigning the activities to appropriate and qualified piping personnel. 1.3 Toexercise control over the flow of information to and from Piping Group during various stages of engineering. 2 Abbreviations AFC ~ Approved for Ci API- American Petroleum Institute struction BS- British Standards DEP- Design & Engineering Practice ERD- Engineering Reference Document FEED ~ Front End Engineering Design HAC - Hazardous area classification IDC- Inter Discipline Check IFC ~ Issued for LOI- Local Office Instructions PAN ~ Project Advise Note P & ID Piping & Instrumentation Diagram PED- Process Flow Diagram SDC- Single Discipline Check SP- Standard Practice Page 4 of 23 Piping Engineering Department Guideline Mott MacDonald Consultants (India) Pvt. Lid 3 Organisation- Piping Group 3.1 Scope & Application: ‘This section of the document describes the organizational structure of Piping Group. It also defines the responsibilities and functions of the various categories of the personnel in Piping Group. 3.2 Group Structure: Piping group organisation structure is shown below ‘The responsibilities of the individuals in Piping Group are given in Doc No. (LATER) Discipline Head t + Dy.Discipline Head Dy.Discipline Head (Stress Supports) (Layouts) Principal Engineer Principal Engineer a a5 Principal Engineer (Specification & MTO) Senior Engineer Senior Engineer q t ! Senior Engineer Engineer Tngincer ¥ T - J Jnr. Engineer Jnr, Engineer ingineer J 1 —, t Trainee Engineer ‘Trainee Engineer nr. Engineer T t Trainee Engineer Principal Designer 1 Senior Designer ae Designer Draughtsman / Cad Operator 3D Modellers Page 5 of 3 Piping Engineering Department Guideline Mott MacDonald Consultants (India) Pvt. Lid 4 Piping Discipline Working Guide 4.1 Introduction ‘This guide supplements the procedures detailed in the Local Office Instructions (LOI's). It does not supersedes or replace these LOI’s, instead this guide is meant to be aide-memoir in the generation of deliverables, and to ensure that consistency is achieved across the board. 4.2 Piping Deliverables 4.2.1 Prior to the commencement of any project, a thorough search and review of design codes, recommended practices, engineering standards etc must be undertaken to ensure that these are incorporated into the project as required. This is to include ERD’s, SP's, DEP’s, API's, BS’s etc. For Detail Engineering Project. FEED package shall be reviewed & necessary queries shall be addressed at the beginning of project. Lead engineer is responsible to prepare group work instruction for the major projects as per Appendix ~A 42.2 Alll deliverables must be SDC checked before being circulated on IDC to the disciplines. ‘An SDC stamp must be on the deliverable and the checker must sign and date this, 42.3 SDC copies must be retained in the files for auditing purposes and sufficient evidence of SDC back-

You might also like