CRONOGRAMA DE EJECUCION VALORIZADO

PROYECTO : MEJORAMIENTO Y AMPLIACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIE

ITEM

NOMBRE DE TAREA

DURACION

MEJORAMIENTO Y AMPLIACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO BASI


450 das?
01
01.01
01.01.01
01.01.01.01

SUBSISTEMA DE SUCASCO
AGUA POTABLE
POZO TUBULAR (02 UNIDADES)
TRABAJOS PRELIMINARES

01.01.01.01.01

LIMPIEZA DE TERRENO MANUAL

01.01.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

01.01.01.01.03

INSTALACION DE MAQUINAS Y EQUIPOS

01.01.01.02

PERFORACION A ROTACION DE CIRCULACION DIRECTA

01.01.01.02.01

PERFORACION DE D=575mm (Tub. =375mm) EN MATERIAL TIPO I

01.01.01.02.02

PERFORACION DE D=575mm (Tub. =375mm) EN MATERIAL TIPO II

01.01.01.03
01.01.01.03.01
01.01.01.03.02
01.01.01.04

ADQUISICION Y COLOCACION DE TUBERIAS


TUBERIA PVC SAP CLASE 10, D=15"
INSTALACION DE TUBERIA PVC SAP Y FILTRO D = 15"
LAVADO PRELIMINAR Y ENGRAVADO

01.01.01.04.01

EXTRACCION, SELECCION Y SUMINISTRO DE GRAVA 3/4 - 1/2"

01.01.01.04.02

LAVADO PRELIMINAR EN POZOS

01.01.01.04.03

COLOCACION DE GRAVA SELECCIONADA EN POZOS

01.01.01.05

DESARROLLO DEL POZO CON CHORRO DE ALTA VELOCIDAD

01.01.01.05.01

DESARROLLO DEL POZO CON AIRE COMPRIMIDO

01.01.01.05.02

CONSTRUCCION DE BASE PARA ANCLAJE EN POZO

01.01.02
01.01.02.01

CASETA DE BOMBEO (02 UNIDADES)


TRABAJOS PRELIMINARES

01.01.02.01.01

LIMPIEZA DE TERRENO

01.01.02.01.02

TRAZO Y REPLANTEO PRELIMINAR

01.01.02.02

MOVIMIENTO DE TIERRAS

01.01.02.02.01

EXCAVACION MANUAL DE TERRENO

01.01.02.02.02

REFINE Y NIVELACION Y COMPACTACION

01.01.02.02.03
01.01.02.03

ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m


OBRAS DE CONCRETO SIMPLE

01.01.02.03.01

SOLADO PARA ZAPATAS DE 4" MEZCLA 1:10 CEMENTO-HORMIGON

01.01.02.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

380 das?
357 das?
37 das?
8 das?
1 da?
1 da?
6 das?
11 das?
3 das?
8 das?
6 das?
4 das?
2 das?
5 das?
1 da?
2 das?
2 das?
7 das?
6 das?
1 da?
36 das?
2 das?
1 da?
1 da?
9 das?
3 das?
1 da?
1 da?
5 das?
1 da?
1 da?

COSTO

M1

7198491.93
4420501.26
1626156.34
58375.63
726.74
2.98
4.16
719.60
18203.00
5098.65
13104.36
19033.00
16158.54
2874.46
4127.98
627.54
1935.02
1565.42
16284.90
14823.68
1461.23
181933.13
86.80
37.08
49.73
260.02
221.33
20.12
18.57
1040.87
210.09
212.86

M2

406,602.01 769,020.02
140,138.90 489,028.52
39,434.84 217,613.13
39,434.84 18,940.79
726.74
2.98
4.16
719.60
18,203.00
5,098.65
13,104.36
19,033.00
16,158.54
2,874.46
1,472.09
2,655.88
627.54
844.55
1,090.46
1,565.42
16,284.90
14,823.68
1,461.23
- 177,712.64
86.80
37.08
49.73
260.02
221.33
20.12
18.57
1,040.87
210.09
212.86

ITEM
01.01.02.03.03
01.01.02.03.04
01.01.02.04
01.01.02.04.01

NOMBRE DE TAREA
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO HASTA 0.30m
CONCRETO ARMADO
ZAPATAS

01.01.02.04.01.01

CONCRETO FC=175 KG/CM2, PARA ZAPATAS

01.01.02.04.01.02

ACERO CORRUGADO FY= 4200 GRADO 60 EN ZAPATAS

01.01.02.04.02

COLUMNAS

01.01.02.04.02.01

CONCRETO F'C=175KG/CM2. PARA COLUMNAS

01.01.02.04.02.02

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

01.01.02.04.02.03
01.01.02.04.03

ACERO CORRUGADO FY= 4200 GRADO 60 EN COLUMNAS


VIGAS

01.01.02.04.03.01

CONCRETO FC=175 KG/CM2 PARA VIGAS

01.01.02.04.03.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

01.01.02.04.03.03

ACERO CORRUGADO FY= 4200 GRADO 60 EN VIGAS

01.01.02.04.04
01.01.02.04.04.01

LOSA DE TECHO
CONCRETO F'C=210 KG/CM2. PARA TECHO

01.01.02.04.04.02

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA TECHO

01.01.02.04.04.03

ACERO CORRUGADO FY= 4200 GRADO 60 EN LOSA DE TECHO

01.01.02.05
01.01.02.05.01
01.01.02.06
01.01.02.06.01
01.01.02.07

DURACION

CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS

MUROS Y TABIQUES DE ALBAILERIA


MURO DE LADRILLO SOGA E=20cm MEZCLA 1:5 (CEMENTO:ARENA)
TARRAJEOS
TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO - ARENA
PISOS Y VEREDAS

01.01.02.07.01

FALSO PISO DE 4" DE CONCRETO 1:10

01.01.02.07.02

PISOS DE CONCRETO SIN COLOREAR ACABADO FROTACHADO E=1.5 CMTS

01.01.02.07.03

VEREDA DE CONCRETO DE 4"

01.01.02.08
01.01.02.08.01

CERCO PERIMETRICO
MOVIMIENTO DE TIERRAS

01.01.02.08.01.01

EXCAVACION DE TERRENO NORMAL

01.01.02.08.01.02

REFINE NIVELACION Y COMPACTACION

01.01.02.08.01.03

ELIMINACION MATERIAL EXCEDENTE

01.01.02.08.02
01.01.02.08.02.01
01.01.02.08.03
01.01.02.08.03.01

OBRAS DE CONCRETO SIMPLE


CONCRETO SIMPLE FC=140 KG/CM2
ENMALLADO
ENMALLADO CON MARCO METALICO

1 da?
2 das?
11 das?
2 das?
1 da?
1 da?
2 das?
1 da?
1 da?
1 da?
4 das?
1 da?
2 das?
1 da?
4 das?
1 da?
2 das?
1 da?
5 das?
5 das?
5 das?
5 das?
3 das?
1 da?
1 da?
1 da?
6 das?
6 das?
1 da?
1 da?
1 da?
1 da?
1 da?
2 das?
2 das?

COSTO

M1

M2

498.21

1565.08

791.18

355.07

418.83

1078.78

507.71

273.36

297.71

1775.12

1775.12

265.07
352.85
3,970.33
503.00
300.57
202.44
823.47
151.89
173.36
498.21
1,565.08
791.18
355.07
418.83
1,078.78
507.71
273.36
297.71
1,407.58
1,407.58

1056.79

1056.79

512.63

110.30

156.66

245.67

5600.01

88.62

65.88

5,600.01
88.62
65.88
7.91
14.82
570.49
570.49
4,940.90
4,940.90

265.07

352.85

3970.33

503.00

300.57

202.44

823.47

151.89

173.36

7.91

14.82

570.49

570.49

4940.90

4940.90

ITEM
01.01.02.09
01.01.02.09.01
01.01.02.10
01.01.02.10.01
01.01.02.10.02
01.01.02.11
01.01.02.11.01
01.01.02.12
01.01.02.12.01
01.01.02.12.02
01.01.03
01.01.03.01
01.01.03.01.01
01.01.03.02

NOMBRE DE TAREA
PINTURA EN INTERIORES AL TEMPLE 2 MANOS
PUERTAS Y VENTANAS
PUERTA METALICA 0.85 x 1.80
VENTANA DE ALUMINIO 1.5M X 0.8M
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS FIERRO
EQUIPOS ELECTROMECANICOS
SUMINISTRO Y COLOCACION DE ELECTROBOMBA
SUBESTACION DE DISTRIBUCION
LINEA DE IMPULSION (L=1108.0 m)
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML
MOVIMIENTO DE TIERRAS

01.01.03.02.01

EXCAVACION MANUAL TERRENO NORMAL/ML 0.80X0.50

01.01.03.02.02

EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA 0.50x0.70

01.01.03.02.03

EXCAVACION - CORTE MANUAL EN TERRENO ROCOSO 0.50X0.70

01.01.03.02.04

REFINE NIVELACION Y FONDOS PARA TUBERIA DE AGUA

01.01.03.02.05

CAMA DE APOYO (MATERIAL DE PRESTAMO)

01.01.03.02.06
01.01.03.03

RELLENO Y COMPACTADO DE ZANJAS


SUMINISTRO E INSTALACION DE TUBERIAS

01.01.03.03.01

TUBERIA PEAD CLASE 10, D=90mm

01.01.03.03.02

PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA

01.01.03.04

ACCESORIOS

01.01.03.04.01

COLOCACION DE ACCESORIOS

01.01.03.04.02

SUMINISTRO DE ACCESORIOS PEAD EN IMPULSION 90mm

01.01.04
01.01.04.01
01.01.04.01.01
01.01.04.01.02
01.01.04.02

DURACION

PINTURA

RESERVORIO (155 m3)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS

01.01.04.02.01

EXCAVACION MANUAL DE ZANJA DE MATERIAL SUELTO

01.01.04.02.02

EXCAVACIN C/MAQUINARIA EN TERRENO EN ROCA SUELTA

01.01.04.02.03

EXCAVACION C/EQUIPO EN ROCA FIJA

01.01.04.02.04

REFINE, NIVELACION Y COMPACTACION

2 das?
2 das?
2 das?
1 da?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
77 das?
2 das?
2 das?
75 das?
50 das?
49 das?
6 das?
8 das?
14 das?
15 das?
10 das?
6 das?
2 das?
2 das?
1 da?
1 da?
158 das?
4 das?
3 das?
1 da?
97 das?
3 das?
1 da?
2 das?
1 da?

COSTO

M1

M2

234.67

234.67

1904.75

477.74

1427.01

144.11

144.11

165347.03

23282.70

142064.33

48169.67

507.00

507.00

14152.89

3834.70

3731.76

1928.99

165,347.03
23,282.70
142,064.33
5,177.46
507.00
507.00
4,670.46
1,375.54
1,365.93
1,928.99

1140.63

1953.41

1563.39

28746.39

28383.28

363.11

4763.39

12.70

4750.69

66633.67

445.78

190.40

2,733.81
445.78
190.40
255.38
2,288.03
175.26
660.58
1,365.22
86.97

255.38

2737.25

175.26

660.58

1365.22

92.97

ITEM
01.01.04.02.05
01.01.04.02.06
01.01.04.03
01.01.04.03.01
01.01.04.04
01.01.04.04.01
01.01.04.04.02
01.01.04.05
01.01.04.05.01
01.01.04.05.02
01.01.04.06

NOMBRE DE TAREA
ACARREO MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO BASE DE RESERVORIO E=4"
CONCRETO EN CIMENTACION
CONCRETO FC=210 KG/CM2, LOSA DE FONDO
ACERO FY= 4,200Kg/cm2, CORTADO Y HABILITADO
CONCRETO EN LOSA FONDO
CONCRETO FC=175 KG/CM2
ACERO FY= 4,200Kg/cm2
CONCRETO MURO CIRCULAR

01.01.04.06.01

CONCRETO FC=280KG/CM2

01.01.04.06.02

ENCOFRADO Y DESENCOFRADO DE MUROS

01.01.04.06.03

ACERO FY= 4,200Kg/cm2

01.01.04.07
01.01.04.07.01

CONCRETO EN COLUMNA CENTRAL


CONCRETO FC=210 KG/CM2

01.01.04.07.02

ENCOFRADO Y DESENCOFRADO

01.01.04.07.03

ACERO FY= 4,200Kg/cm2

01.01.04.08

CONCRETO EN VIGAS DE AMARRE

01.01.04.08.01

CONCRETO FC=210 KG/CM2

01.01.04.08.02

ENCOFRADO Y DESENCOFRADO

01.01.04.08.03
01.01.04.09
01.01.04.09.01

ACERO FY= 4,200Kg/cm2


CONCRETO EN TECHO DE RESERVORIO
CONCRETO FC=210KG/CM2,(RESERVORIO)

01.01.04.09.02

ENCOFRADO Y DESENCOFRADO CUPULA

01.01.04.09.03

ACERO FY= 4,200Kg/cm2

01.01.04.10

CONCRETO EN VERTEDERO

01.01.04.10.01

CONCRETO FC=210 KG/CM2

01.01.04.10.02

ENCOFRADO Y DESENCOFRADO

01.01.04.10.03
01.01.04.11

ACERO FY= 4,200Kg/cm2(ACERO)


REVOQUES Y ENLUCIDOS

01.01.04.11.01

TARRAJEO INTERIOR C/IMPERMEABILIZANTE

01.01.04.11.02

TARRAJEO INTERIOR Y EXTERIOR

01.01.04.12
01.01.04.12.01

DURACION

1 da?
6 das?
1 da?
1 da?
4 das?
1 da?
3 das?
4 das?
1 da?
3 das?
17 das?
2 das?
9 das?
6 das?
3 das?
1 da?
1 da?
1 da?
5 das?
1 da?
2 das?
2 das?
18 das?
1 da?
6 das?
11 das?
3 das?
1 da?
1 da?
1 da?
20 das?
8 das?
12 das?
11 das?
11 das?

RELLENO CON MATERIAL PROPIO

VEREDA PERIMETRAL
MOVIMIENTO DE TIERRAS

COSTO

M1

M2

10.09

433.13

1749.89

1749.89

4345.69

2417.97

1927.71

5080.29

2532.56

2547.74

12915.03

5408.55

2792.26

4714.21

339.71

89.34

73.34

177.03

3778.28

1734.24

626.10

1417.93

12529.41

1364.88

1583.33

9581.19

87.13

31.53

19.90

35.70

9131.93

3819.46

5312.48

3261.74

1121.06

ITEM

NOMBRE DE TAREA

01.01.04.12.01.01

EXCAVACION MANUAL EN ROCA SUELTA

01.01.04.12.01.02

REFINE NIVELACION Y COMPACTACION

01.01.04.12.01.03

ELIMINACION MATERIAL EXCEDENTE

01.01.04.12.02

OBRAS DE CONCRETO SIMPLE

01.01.04.12.02.01

CONCRETO SIMPLE FC=140 KG/CM2

01.01.04.12.02.02

ENCOFRADO Y DESENCOFRADO NORMAL

01.01.04.13
01.01.04.13.01

CERCO PERIMETRICO
MOVIMIENTO DE TIERRAS

01.01.04.13.01.01

EXCAVACION MANUAL EN ROCA SUELTA

01.01.04.13.01.02

REFINE NIVELACION Y COMPACTACION

01.01.04.13.01.03

ELIMINACION MATERIAL EXCEDENTE

01.01.04.13.02
01.01.04.13.02.01
01.01.04.13.03
01.01.04.13.03.01
01.01.04.14
01.01.04.14.01
01.01.04.15
01.01.04.15.01

OBRAS DE CONCRETO SIMPLE


CONCRETO SIMPLE FC=140 KG/CM2
ENMALLADO
ENMALLADO CON MARCO METALICO
PINTURA
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
OTRAS PARTIDAS
MORTERO PENDIENTE FONDO (MORTERO 1:5)

01.01.04.15.02

ESCALERA FG 2"

01.01.04.15.03

TAPA METALICA DE 0.60 X 0.60 M2

01.01.04.15.04

SUMINISTRO Y COLOCACION DE HIPOCLAROR

01.01.04.15.05

TUBERIA DE VENTILACION FG D=2".

01.01.04.15.06

DESINFECCION DE RESERVORIO

01.01.05
01.01.05.01

CASETA DE VALVULAS (01 UND)


TRABAJOS PRELIMINARES

01.01.05.01.01

LIMPIEZA DE TERRENO

01.01.05.01.02

TRAZO Y REPLANTEO PRELIMINAR

01.01.05.02

MOVIMIENTO DE TIERRAS

01.01.05.02.01

EXCAVACION MANUAL

01.01.05.02.02

EXCAVACION MANUAL EN ROCA SUELTA

01.01.05.02.03

REFINE Y NIVELACION Y COMPACTACION

01.01.05.02.04

ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m

01.01.05.03
01.01.05.03.01

DURACION

5 das?
1 da?
2 das?
3 das?
1 da?
2 das?
8 das?
8 das?
1 da?
1 da?
1 da?
1 da?
1 da?
4 das?
4 das?
5 das?
5 das?
81 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
15 das?
2 das?
1 da?
1 da?
10 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?

CONCRETO SIMPLE
SOLADO BASE CASETA DE VALV. E=4"

COSTO

M1

M2

954.30

67.39

99.37

2140.68

1646.44

494.24

8795.19

222.96

201.98

8.40

12.59

505.45

505.45

8066.77

8066.77

856.27

856.27

580.09

95.68

83.02

119.29

20.34

234.98

26.79

5977.40

10.10

4.32

5.79

75.61

27.57

35.21

9.16

3.67

119.30

119.30

ITEM
01.01.05.04

NOMBRE DE TAREA

01.01.05.04.01

CONCRETO FC=210 KG/CM2, MUROS - LOSA DE FONDO

01.01.05.04.02

ENCOFRADO Y DESENCOFRADO

01.01.05.04.03

ACERO DE REFUERZO FY= 4,200Kg/cm2(ACERO)

01.01.05.05
01.01.05.05.01
01.01.05.06

DURACION

OBRAS DE CONCRETO ARMADO

TARRAJEOS
TARRAJEO MORTERO 1:2 E=1.5cm
ACCESORIOS CASETA DE VALVULAS

01.01.05.06.01

SUMINISTRO Y COLOCACION DE TAPA METALICA

01.01.05.06.02

SUMINISTRO DE ACCESORIOS 90mm x 90mm EN CASETA DE VALVULAS

01.01.06
01.01.06.01

CASETA DE CAPTACION C-01 (SECTOR PURUNI)


TRABAJOS PRELIMINARES

01.01.06.01.01

LIMPIEZA DE TERRENO

01.01.06.01.02

TRAZO Y REPLANTEO PRELIMINAR

01.01.06.02

MOVIMIENTO DE TIERRAS

01.01.06.02.01

EXCAVACION MANUAL PARA ESTRUCTURAS

01.01.06.02.02

REFINE, NIVELACION Y COMPACTACION

01.01.06.02.03
01.01.06.03

ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m


CONCRETO SIMPLE

01.01.06.03.01

SOLADO E=4"

01.01.06.03.02

CONCRETO BAJO FILTRO FC=140 KG/CM2

01.01.06.03.03

CONCRETO CUBIERTA FILTRO F'C=175 KG/CM2

01.01.06.04

CONCRETO ARMADO

01.01.06.04.01

CONCRETO FC=210 KG/CM2

01.01.06.04.02

ENCOFRADO Y DESENCOFRADO

01.01.06.04.03
01.01.06.05

ACERO DE REFUERZO FY= 4,200Kg/cm2


TARRAJEOS

01.01.06.05.01

TARRAJEO CON IMPERMEABILIZANTES, 1:1 E= 1.5CM

01.01.06.05.02

TARRAJEO EN EXTERIORES 1:2 E=1.5cm

01.01.06.06
01.01.06.06.01
01.01.06.07

PINTURA
PINTURA EN MUROS EXTERIORES
FILTROS

01.01.06.07.01

FILTRO DE ARENA

01.01.06.07.02

FILTRO DE GRAVA

01.01.06.08
01.01.06.08.01

ACCESORIOS
COLOCACION DE ACCESORIOS

5 das?
1 da?
3 das?
1 da?
2 das?
2 das?
2 das?
1 da?
1 da?
17 das?
2 das?
1 da?
1 da?
11 das?
2 das?
1 da?
1 da?
8 das?
1 da?
1 da?
1 da?
5 das?
1 da?
3 das?
1 da?
3 das?
2 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
3 das?
2 das?

COSTO

M1

M2

2414.35

1077.62

764.64

572.10

298.41

298.41

3059.63

27.83

3031.80

4934.16

20.65

10.04

10.61

106.87

80.30

9.01

4,934.16
20.65
10.04
10.61
106.87
80.30
9.01
17.57
250.78
148.60
35.31
66.87
2,663.93
1,100.13
730.07
833.73
730.39
611.61
118.78
90.55
90.55
15.04
11.37
3.67
1,055.94
259.71

17.57

250.78

148.60

35.31

66.87

2663.93

1100.13

730.07

833.73

730.39

611.61

118.78

90.55

90.55

15.04

11.37

3.67

1055.94

259.71

ITEM
01.01.06.08.02
01.01.07
01.01.07.01
01.01.07.01.01
01.01.07.02

NOMBRE DE TAREA
SISTEMA DE DISTRIBUCION L=54,344 .00 m
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML
MOVIMIENTO DE TIERRAS

01.01.07.02.01

EXCAVACION MANUAL TERRENO SUELTO/ML 0.50X0.70

01.01.07.02.02

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

01.01.07.02.03

EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA

01.01.07.02.04

REFINE NIVELACION Y FONDOS PARA TUBERIA DE AGUA

01.01.07.02.05

CAMA DE APOYO (MATERIAL DE PRESTAMO)

01.01.07.02.06

RELLENO Y COMPACTADO DE ZANJAS

01.01.07.03

SUMINISTRO E INSTALACION DE TUBERIAS

01.01.07.03.01

TUBERIA PVC SAP CLASE 10, D=90mm

01.01.07.03.02

TUBERIA PVC SAP CLASE 10, D=75mm

01.01.07.03.03

TUBERIA PVC SAP CLASE 10, D=63mm

01.01.07.03.04

TUBERIA PVC SAP CLASE 10, D=1 1/2"

01.01.07.03.05

TUBERIA PVC SAP CLASE 10, D=1"

01.01.07.03.06

TUBERIA PVC SAP CLASE 10, D=1/2"

01.01.07.03.07

PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA

01.01.07.04
01.01.07.04.01
01.01.07.04.02
01.01.08
01.01.08.01

ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DISTRIBUCION (Sucasco)
VALVULAS (245 UND)
TRABAJOS PRELIMINARES

01.01.08.01.01

LIMPIEZA DE TERRENO

01.01.08.01.02

TRAZO Y REPLANTEO

01.01.08.02
01.01.08.02.01
01.01.08.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO ARMADO

01.01.08.03.01

CONCRETO F'C=175 KG/CM2

01.01.08.03.02

ACERO FY= 4,200Kg/cm2

01.01.08.03.03
01.01.08.04
01.01.08.04.01
01.01.08.05

DURACION

1 da?
316 das?
55 das?
55 das?
178 das
26 das
12 das
20 das
10 das
16 das
18 das
112 das?
9 das?
10 das?
19 das?
20 das
20 das?
18 das?
16 das
103 das?
1 da?
1 da?
199 das?
3 das?
2 das?
1 da?
28 das?
28 das?
35 das?
4 das?
11 das?
20 das
7 das
7 das
141 das?

SUMINISTRO DE ACCESORIOS CAMARA DE CAPTACION

ENCOFRADO Y DESENCOFRADO
TARRAJEOS
TARRAJEO MORTERO 1:2 , E=1.5CM
ACCESORIOS

COSTO

M1

M2

796.23

936063.49

24867.00

24867.00

796.23
8,114.27
8,114.27
8,114.27

534014.21

228535.49

41873.16

35172.90

55944.49

95808.91

76679.28

350355.97

63745.80

55332.10

85593.44

56761.07

44977.78

26136.32

17809.45

26826.31

9.28

26817.03

108071.70

211.12

92.69

118.43

2118.61

2118.61

31227.41

10992.20

9237.05

10998.16

4284.12

4284.12

70230.45

ITEM

NOMBRE DE TAREA

01.01.08.05.01

COLOCACION DE ACCESORIOS

01.01.08.05.02

SUMINISTRO Y COLOCACION DE TAPA METALICA

01.01.08.05.03

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 90mm

01.01.08.05.04

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 75mm

01.01.08.05.05

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 63mm

01.01.08.05.06

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 1 1/2"

01.01.08.05.07

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 1"

01.01.08.05.08

SUMINISTRO DE VALVULA DE PURGA 1" x 90mm

01.01.08.05.09

SUMINISTRO DE VALVULA DE PURGA 1" x 75mm

01.01.08.05.10

SUMINISTRO DE VALVULA DE PURGA 1" x 63mm

01.01.08.05.11

SUMINISTRO DE VALVULA DE PURGA 1" x 1 1/2"

01.01.08.05.12

SUMINISTRO DE VALVULA DE PURGA 1" x 1"

01.01.08.05.13

SUMINISTRO DE VALVULA DE COMPUERTA 90mm

01.01.08.05.14

SUMINISTRO DE VALVULA DE COMPUERTA 75mm

01.01.08.05.15

SUMINISTRO DE VALVULA DE COMPUERTA 63mm

01.01.08.05.16

SUMINISTRO DE VALVULA DE COMPUERTA 1 1/2"

01.01.08.05.17

SUMINISTRO DE VALVULA DE COMPUERTA 1"

01.01.08.05.18

SUMINISTRO DE VALVULA DE PRESION 63mm

01.01.09
01.01.09.01
01.01.09.01.01
01.01.09.01.02
01.01.09.02
01.01.09.02.01
01.01.09.03
01.01.09.03.01
01.01.09.04

CRUCES DE CARRETERA (5 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS

01.01.09.04.01

COLOCACION DE ACCESORIOS

01.01.09.04.02

SUMINISTRO DE ACCESORIOS CRUCE CARRETERA 1

01.01.10
01.01.10.01

CRUCES DE ALCANTARILLA (03 UNIDAD)


TRABAJOS PRELIMINARES

01.01.10.01.01

LIMPIEZA DE TERRENO

01.01.10.01.02

TRAZO Y REPLANTEO PRELIMINAR

01.01.10.02
01.01.10.02.01

DURACION

8 das
21 das
1 da?
5 das
1 da?
9 das?
7 das
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
10 das
1 da?
1 da?
31 das?
4 das?
3 das?
1 da?
24 das?
24 das?
1 da?
1 da?
2 das?
1 da?
1 da?
29 das?
4 das?
3 das?
1 da?
9 das?
9 das?

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL

COSTO

M1

M2

2272.47

11371.59

226.64

446.60

557.62

338.94

513.24

4275.24

5148.27

6775.86

3382.38

5347.66

2257.62

3528.00

5250.00

1914.20

1409.10

15215.01

4728.42

272.09

174.93

97.16

1853.01

1853.01

218.58

218.58

2384.74

46.38

2338.36

4635.25

258.48

166.18

92.30

655.90

655.90

ITEM
01.01.10.03
01.01.10.03.01
01.01.10.04
01.01.10.04.01
01.01.10.04.02
01.01.11
01.01.11.01

NOMBRE DE TAREA
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE ALCANTARILLA 1
CRUCES DE RIACHUELO Y ACEQUIAS (07 UNIDADES)
TRABAJOS PRELIMINARES

01.01.11.01.01

LIMPIEZA DE TERRENO

01.01.11.01.02

TRAZO Y REPLANTEO PRELIMINAR

01.01.11.02
01.01.11.02.01
01.01.11.03
01.01.11.03.01
01.01.11.04

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS

01.01.11.04.01

COLOCACION DE ACCESORIOS

01.01.11.04.02

SUMINISTRO DE ACCESORIOS CRUCE RIACHUELO Y ACEQUIAS 1

01.01.12

DURACION

1 da?
1 da?
15 das?
1 da?
1 da?
27 das?
4 das?
3 das?
1 da?
17 das?
17 das?
1 da?
1 da?
5 das?
1 da?
1 da?
138 das?
1 da?
16 das?
69 das?
49 das
52 das
52 das?
52 das
55 das
12 das?
115 das?
3 das?
11 das?
4 das?
2 das?
40 das
7 das?
22 das?
33 das?

OBRAS DE CONCRETO SIMPLE

CONEXION DOMICILIARIA (780 UNIDADES)

01.01.12.01

TRAZO Y REPLANTEO PRELIMINAR

01.01.12.02

EXCAVACION MANUAL

01.01.12.03

CAMA DE APOYO (MATERIAL DE PRESTAMO)

01.01.12.04

VALVULA COMPUERTA DE BRONCE 1/2"

01.01.12.05

UNION UNIVERSAL DE 1/2"

01.01.12.06

NIPLE FG 1/2"

01.01.12.07

CAJA PARA VALVULA DE 30X30cm

01.01.12.08

SUMINISTRO Y COLOCACION DE TAPA METALICA

01.01.12.09

TUBERIA PVC SAP CLASE 10, D=1/2" (CONEXION URBANA)

01.01.12.10

LAVADERO MULTIUSO DOMICILIAR(325 UND)

01.01.12.10.01

TRAZO Y REPLANTEO

01.01.12.10.02

EXCAVACION MANUAL

01.01.12.10.03

CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PG.

01.01.12.10.04

CONCRETO F'C=175 KG/CM2 LOSA

01.01.12.10.05

ENCOFRADO Y DESENCOFRADO

01.01.12.10.06

ACERO FY= 4,200Kg/cm2

01.01.12.10.07

COLOCACION DE ACCESORIOS

01.01.12.10.08

SUMINISTRO DE ACCESORIOS PARA LAVADERO MULTIUSO

COSTO

M1

M2

377.42

377.42

3343.44

76.48

3266.96

3751.92

266.65

171.43

95.22

1285.56

1285.56

587.10

587.10

1612.60

178.46

1434.14

202881.92

193.85

1204.46

10313.60

31332.60

15088.11

6288.26

22577.70

36203.44

7647.82

72032.08

1546.00

828.19

11823.90

8079.44

32222.95

6184.10

3014.50

8333.00

ITEM
01.02
01.02.01

NOMBRE DE TAREA
TRABAJOS PRELIMINARES

01.02.01.01

LIMPIEZA DE TERRENO

01.02.01.02

TRAZO Y REPLANTEO

01.02.02

MOVIMIENTO DE TIERRAS

01.02.02.01

EXCAVACION MANUAL

01.02.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO

01.02.02.03

RELLENO CON MATERIAL GRAVA Y CANTO RODADO

01.02.02.04

RELLENO CON MATERIAL DE PRESTAMO MANUAL

01.02.02.05
01.02.03

ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m


OBRAS DE CONCRETO CICLOPEO

01.02.03.01

MURO FOSA MEZCLA 1:10 C:H 50% PG

01.02.03.02

ENCOFRADO Y DESENCOFRADO EN MUROS BAJOS

01.02.04
01.02.04.01
01.02.05
01.02.05.01

OBRAS DE CONCRETO SIMPLE


CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
OBRAS DE CONCRETO ARMADO
LOSAS ARMADA

01.02.05.01.01

CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA

01.02.05.01.02

ENCOFRADO Y DESENCOFRADO DE LOSA

01.02.05.01.03
01.02.05.02

ACERO FY= 4,200Kg/cm2


COMPUERTA DE MANTENIMIENTO

01.02.05.02.01

CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA

01.02.05.02.02

ENCOFRADO Y DESENCOFRADO DE TAPA

01.02.05.02.03

ACERO FY= 4,200Kg/cm2

01.02.05.03
01.02.05.03.01

ESCALERA
CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA

01.02.05.03.02

ENCOFRADO Y DESENCOFRADO DE ESCALERA

01.02.05.03.03

ACERO FY= 4,200Kg/cm2

01.02.06

DURACION

LETRINAS ECOLOGICAS (325 UND)

ESTRUCTURA DE MADERA Y COBERTURAS

01.02.06.01

COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)

01.02.06.02

CORREAS DE MADERA DE 2"X2"X10'

01.02.06.03

VIGA DE MADERA ROLLIZO DE 2"X1.8m

01.02.06.04

DINTEL DE MADERA ROLLIZO DE 2"X1.8m

01.02.06.05

PUERTA METALICA 0.85*1.80

01.02.06.06

VENTANA DE ALUMINIO, VIDRIO 10MM

10

283 das?
39 das?
28 das
11 das?
219 das?
1 da?
36 das?
30 das?
15 das?
35 das
59 das?
58 das?
1 da?
26 das?
26 das?
71 das?
44 das?
12 das?
30 das
29 das?
11 das?
1 da?
10 das?
3 das?
44 das?
11 das?
33 das
20 das?
83 das?
42 das?
41 das
17 das?
4 das?
41 das
9 das?

COSTO

M1

M2

1380509.42

9071.02

4280.84

4790.17

114971.53

83881.85

2999.83

12907.91

4454.74

10727.20

311138.92

197085.79

114053.13

77432.85

77432.85

209299.49

96127.79

50780.29

18666.10

26681.41

8499.89

3658.52

2817.61

2023.76

104671.81

45365.67

41058.35

18247.79

152722.34

30690.05

26258.47

8111.54

2086.55

77632.23

7943.51

ITEM
01.02.07
01.02.07.01
01.02.08
01.02.08.01
01.02.08.02
01.02.09
01.02.09.01
01.02.10

NOMBRE DE TAREA

DURACION

MUROS Y TABIQUES
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
REVOQUES Y ENLUCIDOS
TARRAJEO, ACABADO CON CEMENTO-ARENA
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1 EN CAMARAS
PINTURA
PINTURA EN CALAMINAS DE LETRINA (ESMALTE Y ANTIC.)
SISTEMA DE DESAGUE Y AGUA POTABLE

01.02.10.01

VENTILACION PARA LETRINA ECOLOGICA D=4"

01.02.10.02

TUBERIA PVC SAP CLASE 10, D=1/2"

01.02.10.03

TUBERIA PVC SAL CLASE 7.5, D=2"

01.02.10.04

REVESTIMIENTO DE PISO,ZOCALO DUCHA C/MAYOLICA BLANCA DE 25X25 CM

01.02.10.05

COLOCACION DE ACCESORIOS DE AGUA Y DESAGE

01.02.10.06

SUMINISTRO DE ACCESORIOS DE AGUA Y DESAGE

01.03
01.03.01
01.03.01.01
01.03.01.01.01
01.03.01.02

SISTEMA DE ALCANTARILLADO
RED DE ALCANTARILLADO (10,583.4 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS

01.03.01.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL P/ALCANT.

01.03.01.02.02

EXCAVACION DE ZANJA,T. ROCA SUELTA

01.03.01.02.03

REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 160 mm - 250 mm

01.03.01.02.04

REFINE Y NIVELACION ZANJA TERR.SEMIROCA PARA TUB. 160mm - 250 mm

01.03.01.02.05

CAMA DE APOYO P/TUBERIA H=0.20, A = 0.60 M

01.03.01.02.06

RELLENO COMPACTADO CON MATERIAL PROPIO

01.03.01.02.07

ELIMINACION DE MATERIAL EXCEDENTE D= 5KM

01.03.01.03

SUMINISTRO E INSTALACION DE LA RED DE ALCANTARILLADO

01.03.01.03.01

SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM

01.03.01.03.02

SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM

01.03.01.04
01.03.01.04.01
01.03.01.05

ENTIBADO
ENTIBADO EN ZANJA EN TERRENO DE ROCA SUELTA
PRUEBA HIDRAULICA

01.03.01.05.01

PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 160 MM

01.03.01.05.02

PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 200 MM

01.03.01.06

BUZONES DE INSPECCION

11

31 das
31 das
95 das
42 das
40 das
10 das
10 das
112 das?
22 das?
3 das?
17 das?
12 das
37 das?
21 das
160 das?
160 das?
16 das?
16 das?
160 das?
39 das?
2 das?
106 das?
1 da?
133 das?
1 da?
3 das?
133 das?
15 das?
8 das?
1 da?
1 da?
21 das?
21 das
19 das?
134 das?

COSTO

M1

M2

99410.69

99410.69

183180.93

81440.99

101739.94

8832.94

8832.94

214448.72

29803.78

4366.02

14463.04

38292.19

4917.45

122606.25

739651.29
739651.29
9438.20
9438.20
190356.76
35473.02
1384.39
6399.22

90,862.33 160,662.77
90,862.33 160,662.77
4,666.74
4,771.46
4,666.74
4,771.46
9,842.06 39,835.73
7,160.93 28,312.10
647.49
475.29
1,935.61

39.32

37097.15

2,205.84

8,940.53

105160.41

4803.25

248047.28
145424.07

76,353.53
76,353.53

69,070.53
69,070.53

102623.21

331.82

331.82

16273.08

11663.95

4609.13

169263.29

4,129.80

ITEM
01.03.01.06.01
01.03.01.06.01.01
01.03.01.06.02
01.03.01.06.02.01
01.03.01.06.02.02
01.03.01.06.03
01.03.01.06.03.01
01.03.01.06.04
01.03.01.06.04.01
01.03.01.06.04.02
01.03.01.06.04.03
01.03.01.06.05
01.03.01.06.05.01
01.03.01.06.06
01.03.01.06.06.01
01.03.01.07
01.03.01.07.01
01.03.01.07.02
01.03.01.07.03
01.03.01.07.04
01.03.01.07.05
01.03.01.08
01.03.01.08.01
01.03.01.08.01.01
01.03.01.08.02
01.03.01.08.02.01
01.03.01.08.02.02
01.03.01.08.02.03
01.03.01.08.02.04
01.03.01.08.02.05
01.03.01.08.03
01.03.01.08.03.01
01.03.01.08.04
01.03.01.08.04.01
01.03.01.09

NOMBRE DE TAREA

DURACION

1 da?
TRAZO Y REPLANTEO PRELIMINAR
1 da?
MOVIMIENTO DE TIERRAS
133 das?
EXCAVACION EN ROCA SUELTA
50 das
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
1 da?
OBRAS DE CONCRETO SIMPLE
5 das?
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
5 das?
OBRAS DE CONCRETO ARMADO
63 das?
CONCRETO F'C=210 KG/CM2
8 das?
ENCOFRADO Y DESENCOFRADO NORMAL
39 das
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
2 das?
REVESTIMIENTOS
14 das?
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTI 14 das?
TAPA DE CONCRETO
16 das?
TAPA DE INSPECCION DE 0.60 M
16 das?
CONEXION DOMOCILIARIA (454 UNIDADES)
29 das?
TRAZO Y REPLANTEO PRELIMINAR
7 das?
EXCAVACION MANUAL EN TERRENO SUELTO 0.60X1.0M
23 das
CAMA DE APOYO P/TUBERIA H=0.10M
29 das?
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
20 das
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
4 das?
EMISOR GENERAL (85.00 ML)
24 das?
TRABAJOS PRELIMINARES
1 da?
TRAZO Y REPLANTEO DURANTE LA OBRA P/LINEAS DE DESAGUE
1 da?
MOVIMIENTO DE TIERRAS
23 das?
EXCAVACION MANUAL DE TERRENO NORMAL
6 das?
REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
1 da?
CAMA DE APOYO P/TUBERIA H=0.10M
2 das?
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
2 das?
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
1 da?
SUMINISTRO E INSTALACION DE TUBERIAS
1 da?
SUM. E INST. TUB PVC UF ISO 4435 DN 250 MM
1 da?
PRUEBA HIDRAULICA
1 da?
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 250 MM
1 da?
BUZONES DE INSPECCION (RED EMISOR)
22 das?
TRABAJOS PRELIMINARES

12

COSTO

M1

M2

320.65

9843.20

8304.09

320.65
320.65
3,809.15
3,809.15

320.65

1539.11

9420.93

9420.93

53235.55

38154.89

14197.77

882.89

5087.08

5087.08

91355.88

91355.88

98361.64

2210.41

17565.00

4584.38

14976.82

35,287.05
2,210.41
17,515.68
3,627.87
11,933.09

59025.04

5949.48

117.45

117.45

1566.76

450.02

690.92

171.28

84.17

5,938.48
117.45
117.45
1,555.76
450.02
690.92
171.28
84.17
159.37
4,111.19
4,111.19
154.07
154.07
1,248.45

170.37

4111.19

4111.19

154.07

154.07

1248.45

ITEM
01.03.01.09.01
01.03.01.09.01.01
01.03.01.09.02
01.03.01.09.02.01
01.03.01.09.02.02
01.03.01.09.03
01.03.01.09.03.01
01.03.01.09.04
01.03.01.09.04.01
01.03.01.09.04.02
01.03.01.09.04.03
01.03.01.09.05
01.03.01.09.05.01
01.03.01.09.06
01.03.01.09.06.01
01.03.01.10
01.03.01.10.01
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.01.03
01.04.02
01.04.02.01
01.04.02.02
01.04.02.02.01
01.04.02.02.02
01.04.02.02.03
01.04.02.02.04
01.04.02.02.05
01.04.02.03
01.04.02.03.01
01.04.02.03.02
01.04.02.03.03
01.04.02.03.04

NOMBRE DE TAREA

DURACION

1 da?
TRAZO Y REPLANTEO PRELIMINAR
1 da?
MOVIMIENTO DE TIERRAS
21 das?
EXCAVACION EN ROCA SUELTA
1 da?
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
1 da?
OBRAS DE CONCRETO SIMPLE
1 da?
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
1 da?
OBRAS DE CONCRETO ARMADO
3 das?
CONCRETO F'C=210 KG/CM2
1 da?
ENCOFRADO Y DESENCOFRADO NORMAL
1 da?
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
1 da?
REVESTIMIENTOS
1 da?
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTI 1 da?
TAPA DE CONCRETO
1 da?
TAPA DE INSPECCION DE 0.60 M
1 da?
PRUEBA DE LABORATORIO
15 das?
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
15 das?
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
370 das?
TRABAJOS PRELIMINARES
20 das?
LIMPIEZA DE TERRENO
16 das?
TRAZO Y REPLANTEO PRELIMINAR DE OBRA
3 das?
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
1 da?
CAMARA DE BOMBEO
216 das?
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
1 da?
MOVIMIENTO DE TIERRAS
206 das?
EXCAVACION MANUAL DE TERRENO SUELTO
141 das?
PERFILADO NIVELADO MANUAL DE ZANJA
2 das?
ENROCADO DE CIMENTACION
3 das?
RELLENO Y COMPACTADO CON MATERIAL PROPIO
7 das?
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
1 da?
OBRAS DE CONCRETO ARMADO
52 das?
SOLADO BASE PARA PTAR E=4"
1 da?
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
26 das?
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
12 das?
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
12 das?
TRABAJOS PRELIMINARES

13

COSTO

M1
2.08
2.08

60.74
51.24
9.49
60.85
60.85
500.16
278.89
87.64
133.62
31.40
31.40
593.22
593.22
381.30
381.30
674184.21
5734.69
1169.96
2022.23
2542.50
166629.26
44.49
16864.19
10816.44

M2

2.08
2.08
60.74
51.24
9.49
60.85
60.85
500.16
278.89
87.64
133.62
31.40
31.40
593.22
593.22
381.30
381.30
9,841.73 110,752.62
5,734.69
1,169.96
2,022.23
2,542.50
571.73
2,459.59
44.49
527.24
2,459.59
527.24
2,459.59
-

112.61

909.78

1309.47

3715.89

58707.32

857.52

12450.85

9027.48

35784.30

ITEM
01.04.02.03.05
01.04.02.04

NOMBRE DE TAREA
EQUIPOS ELECTROMECANICOS

01.04.02.04.01

SUMINISTRO Y COLOCACION DE ELECTROBOMBA

01.04.02.04.02

SUB ESTACION ALCANTARILLADO

01.04.02.05

OTROS

01.04.02.05.01

COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO

01.04.02.05.02

TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=17.5cm, L=4.55m

01.04.02.05.03

VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M

01.04.02.05.04

PUERTA METALICA 0.85*1.80

01.04.02.05.05

VENTANA DE ALUMINIO, VIDRIO 10MM

01.04.02.05.06

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.02.05.07

JUNTAS DE WATER STOP e=1 PULG

01.04.02.05.08

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

01.04.02.06

ACCESORIOS

01.04.02.06.01

COLOCACION DE ACCESORIOS

01.04.02.06.02

SUMINISTRO DE ACCESORIOS CAMARA DE BOMBEO

01.04.03

CANAL DE INGRESO

01.04.03.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.03.02

MOVIMIENTO DE TIERRAS

01.04.03.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

01.04.03.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.03.02.03

ENROCADO DE CIMENTACION

01.04.03.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

01.04.03.03

OBRAS DE CONCRETO ARMADO

01.04.03.03.01

SOLADO BASE PARA PTAR E=4"

01.04.03.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.03.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

01.04.03.03.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

01.04.03.04

OTROS

01.04.03.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.03.04.02

JUNTAS DE WATER STOP e=1 PULG

01.04.03.04.03
01.04.04

DURACION

1 da?
3 das?
2 das?
1 da?
42 das?
2 das?
2 das?
1 da?
1 da?
1 da?
15 das?
1 da?
2 das?
2 das?
1 da?
1 da?
216 das?
1 da?
8 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
210 das?
1 da?
1 da?
1 da?
216 das?
1 da?
13 das?

MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE


DESARENADOR

01.04.04.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.04.02

MOVIMIENTO DE TIERRAS

14

COSTO

M1

M2

587.15

75132.96

23872.76

51260.20

8422.39

828.62

1167.71

723.90

238.87

78.21

2975.83

2089.74

319.50

7457.92

203.96

7253.96

733.84

250.43

73.00

460.87
3.22
120.75
43.49
4.25
73.00

5.71

535.71

5.71
229.03

154.04

306.67
68.80
102.16
135.71

210.71

68.46

30.24

3.22
126.46
43.49
4.25

68.80
102.16

5.71
-

13.99

31.92

30.23

18.33
210.71
15.68
13.99
1.69

22.54

5559.59

308.76
15.37
293.39

5,142.90

15.37
807.11

513.72

ITEM

NOMBRE DE TAREA

01.04.04.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

01.04.04.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.04.02.03

ENROCADO DE CIMENTACION

01.04.04.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.04.02.05
01.04.04.03

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO

01.04.04.03.01

SOLADO BASE PARA PTAR E=4"

01.04.04.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.04.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

01.04.04.03.04
01.04.04.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

01.04.04.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.04.04.02

JUNTAS DE WATER STOP e=1 PULG

01.04.04.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

01.04.04.05
01.04.04.05.01
01.04.04.05.02
01.04.05

ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DESARENADOR
MEDIDOR PARSHALL

01.04.05.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.05.02

MOVIMIENTO DE TIERRAS

01.04.05.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

01.04.05.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.05.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.05.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

01.04.05.03

OBRAS DE CONCRETO ARMADO

01.04.05.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.05.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

01.04.05.03.03

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

01.04.05.04

OTROS

01.04.05.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.05.04.02

JUNTAS DE WATER STOP e=1 PULG

01.04.05.04.03
01.04.05.05

DURACION

4 das?
1 da?
1 da?
1 da?
1 da?
5 das?
1 da?
2 das?
1 da?
1 da?
206 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
216 das?
1 da?
7 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
212 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE


ACCESORIOS

01.04.05.05.01

COLOCACION DE ACCESORIOS

01.04.05.05.02

SUMINISTRO DE ACCESORIOS MEDIDOR PARSHALL

15

COSTO

M1

M2

38.91

259.42
33.96

371.90

77.50

259.42

46.10

129.03

4.95
371.90
77.50
59.37
2,696.09
350.49
571.94
732.16
1,041.50
175.13
46.10
129.03

107.93

1757.96

203.96

1554.00

966.98

15.25

421.06
15.63
66.21
50.96
15.25

1,757.96
203.96
1,554.00
540.07

13.21

12.59

615.56
196.46

278.79
106.05
172.74

313.05

188.29

60.43

59.37

2696.09

350.49

571.94

732.16

1041.50

283.06

15.63
92.00
50.96

106.05

25.80
-

13.21
12.59
336.77
-

115.93

66.51

60.43

23.72
313.05
122.01
115.93
6.08

5.85

55.49

25.49

30.00

55.49
25.49
30.00

ITEM
01.04.06

NOMBRE DE TAREA

01.04.06.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.06.02

MOVIMIENTO DE TIERRAS

01.04.06.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

01.04.06.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.06.02.03

ENROCADO DE CIMENTACION

01.04.06.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.06.02.05

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA

01.04.06.03

OBRAS DE CONCRETO ARMADO

01.04.06.03.01

SOLADO BASE PARA PTAR E=4"

01.04.06.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.06.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

01.04.06.03.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

01.04.06.04

OTROS

01.04.06.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.06.04.02

JUNTAS DE WATER STOP e=1 PULG

01.04.06.04.03
01.04.06.05
01.04.06.05.01
01.04.06.05.02
01.04.07

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE


ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS SEDIMENTADOR PRIMARIO
FILTRO ANAEROBICO ASCENDENTE FAA

01.04.07.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.07.02

MOVIMIENTO DE TIERRAS

01.04.07.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

01.04.07.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.07.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.07.02.04
01.04.07.03

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO

01.04.07.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.07.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

01.04.07.03.03

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

01.04.07.04

DURACION

216 das?
1 da?
23 das?
1 da?
3 das?
4 das?
1 da?
1 da?
13 das?
1 da?
5 das?
5 das?
2 das?
201 das?
10 das?
1 da?
2 das?
2 das?
1 da?
1 da?
330 das?
1 da?
246 das?
2 das?
13 das?
1 da?
58 das?
172 das?
46 das?
106 das?
20 das?
268 das?
22 das
1 da?
12 das?

SEDIMENTADOR PRIMARIO

OTROS

01.04.07.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.07.04.02

JUNTAS DE WATER STOP e=1 PULG

01.04.07.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

16

COSTO

M1

M2

231.28

609.09
93.60
515.49
448.19
67.30

1648.07

20762.85
93.60
3560.76
448.19

18,809.87
-

3,045.27
-

58.77

1174.45

13088.17

1553.31

2426.33

3624.09

5484.44

2956.85

1862.74

718.30

163.98
1,648.07
58.77
1,174.45
13,088.17
1,553.31
2,426.33
3,624.09
5,484.44
2,581.05
1,862.74
718.30

375.80

1063.48

101.98

95.39
95.39

961.50

269838.36

10,765.85

1806.18

1,146.94
358.62
788.32
788.32

969.24

1,987.10
1,017.86
969.24

65.47

358.62
7275.00

4434.10

163148.60

22500.12

8,778.75
8,778.75

81963.18

58685.29

76050.42

18004.56

4132.91

2605.50

ITEM
01.04.07.04.04
01.04.07.05

NOMBRE DE TAREA
ACCESORIOS

01.04.07.05.01

COLOCACION DE ACCESORIOS

01.04.07.05.02

SUMINISTRO DE ACCESORIOS FILTRO ANAEROBICO

01.04.08

WETLAND SFS

01.04.08.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.08.02

MOVIMIENTO DE TIERRAS

01.04.08.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

01.04.08.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.08.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.08.02.04

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA

01.04.08.03

SUMINISTRO E INSTALACION DE TUBERIAS

01.04.08.03.01

SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM

01.04.08.03.02

SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM

01.04.08.03.03
01.04.08.04

SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM; DISTRIBUIDOR CRIBADO,L=21.70M
OTROS

01.04.08.04.01

MATERIAL DE AMORTIGUACION

01.04.08.04.02

MATERIAL DE ESTRATO

01.04.08.04.03

VEGETAL FITODEPURADOR

01.04.08.04.04
01.04.08.05

MANTA DE GEOMEMBRANA
ACCESORIOS

01.04.08.05.01

COLOCACION DE ACCESORIOS

01.04.08.05.02

SUMINISTRO DE ACCESORIOS WETLAND SFS

01.04.09

CAMARA DE CONTACTO (7m3)

01.04.09.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.09.02

MOVIMIENTO DE TIERRAS

01.04.09.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

01.04.09.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.09.02.03

ENROCADO DE CIMENTACION

01.04.09.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.09.02.05

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

01.04.09.03

DURACION

SUMINISTRO MATERIAL DE FILTRO

OBRAS DE CONCRETO ARMADO

01.04.09.03.01

SOLADO BASE PARA PTAR E=4"

01.04.09.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.09.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

17

24 das
25 das?
24 das?
1 da?
84 das?
2 das?
82 das?
2 das?
45 das?
1 da?
2 das?
3 das?
1 da?
1 da?
1 da?
32 das?
1 da?
5 das?
20 das?
6 das?
3 das?
2 das?
1 da?
328 das?
1 da?
34 das?
1 da?
5 das?
7 das?
2 das?
6 das?
13 das?
2 das?
4 das?
4 das?

COSTO

M1

M2

51307.45

23005.73

6067.71

16938.02

78534.91
1288.43

588.58
588.58

12274.98

2363.93

3469.30

175.52

5,393.00
699.85
4,693.15
2,363.93
2,153.70
175.52

6266.24

1111.72

200.12

174.88

736.73

62663.17

1441.19

21617.79

4814.41

34789.78

1196.61

433.41

763.20

23475.51

19,272.76
114.00
3,728.45
206.08
354.16
2,822.31
215.55
130.35
14,672.34
2,659.81
1,612.25
2,321.12

114.00

4002.21

206.08

354.16

2822.31

215.55

404.11

14672.34

2659.81

1612.25

2321.12

ITEM
01.04.09.03.04
01.04.09.04

NOMBRE DE TAREA

DURACION

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

01.04.09.04.01

MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5

01.04.09.04.02

COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)

01.04.09.04.03

CORREAS DE MADERA DE 2"X2"X10'

01.04.09.04.04

VIGA DE MADERA ROLLIZO DE 2"X1.8m

01.04.09.04.05

DINTEL DE MADERA ROLLIZO DE 2"X1.8m

01.04.09.04.06

PUERTA METALICA 0.85*1.80

01.04.09.04.07

VENTANA DE ALUMINIO, VIDRIO 10MM

01.04.09.04.08

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.09.04.09

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

01.04.09.05

ACCESORIOS

01.04.09.05.01

COLOCACION DE ACCESORIOS

01.04.09.05.02

SUMINISTRO DE ACCESORIOS CAMARA DE CONTACTO

01.04.10

LECHO DE SECADO DE LODOS

01.04.10.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.10.02

MOVIMIENTO DE TIERRAS

01.04.10.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

01.04.10.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.10.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.10.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

01.04.10.03

OBRAS DE CONCRETO SIMPLE

01.04.10.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.10.03.02

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

01.04.10.03.03
01.04.10.04

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60


SUMINISTRO E INSTALACION DE TUBERIAS

01.04.10.04.01

SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM

01.04.10.04.02

SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM; DISTRIBUIDOR CRIBADO,L=13M

01.04.10.05

OTROS

01.04.10.05.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.10.05.02

JUNTAS DE WATER STOP e=1 PULG

01.04.10.05.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

01.04.10.05.04

COLOCACION DE FILTROS DE GRAVA

01.04.10.05.05

COLOCACION DE FILTROS DE ARENA

01.04.10.05.06

COLOCACION DE LADRILLOS CON ARENA

18

3 das?
301 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
4 das?
3 das?
1 da?
328 das?
1 da?
32 das?
1 da?
8 das?
8 das?
8 das?
7 das?
4 das?
2 das?
1 da?
1 da?
1 da?
1 da?
317 das?
5 das?
1 da?
1 da?
2 das?
2 das?
10 das?

COSTO

M1

M2

12.84

8,079.16
757.98
474.58
137.86
107.73
24.96
12.84

238.87

78.21

480.88

34.39

3088.43

535.39

2553.04

30201.83

158.10

3062.45

512.55

571.31

1392.89

585.71

22,066.60
158.10
2,838.08
512.55
571.31
1,392.89
361.34
6,811.85
1,862.87
4,322.53
626.44
1,678.67
1,431.88
246.78
10,579.91

8079.16

1598.53

474.58

146.07

107.73

24.96

6811.85

1862.87

4322.53

626.44

1678.67

1431.88

246.78

12247.54

841.03

359.15

359.15

150.90

1085.97

769.41

4030.29

1,085.97
769.41
4,030.29

ITEM

NOMBRE DE TAREA

01.04.10.05.07

COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO

01.04.10.05.08

TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=17.5cm, L=4.55m

01.04.10.05.09

VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M

01.04.10.06

ACCESORIOS

01.04.10.06.01

COLOCACION DE ACCESORIOS

01.04.10.06.02

SUMINISTRO DE ACCESORIOS LECHO DE SECADO

01.04.11

CAJA DE CONTROL DE VALVULAS

01.04.11.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.11.02

MOVIMIENTO DE TIERRAS

01.04.11.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

01.04.11.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.11.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.11.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

01.04.11.03

OBRAS DE CONCRETO ARMADO

01.04.11.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.11.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

01.04.11.03.03
01.04.11.04
01.04.11.04.01
01.04.11.04.02
01.04.11.05

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS

01.04.11.05.01

COLOCACION DE ACCESORIOS

01.04.11.05.02

SUMINISTRO DE ACCESORIOS CAJA DE VALVULAS

01.04.12

SEALIZACION

01.04.12.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.12.02

ACCESORIOS

01.04.12.02.01

COLOCACION DE SEALIZACION

01.04.12.02.02

SUMINISTRO DE SEALIZACION

01.04.13

FORESTACION

01.04.13.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.13.02

CERCO FORESTAL

01.04.13.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

01.04.13.02.02

RELLENO Y COMPACTADO CON MATERIALCOMPUS

01.04.13.02.03

SEMBRIO DE ARBOLES

01.04.14

DURACION

3 das?
2 das?
1 da?
2 das?
1 da?
1 da?
328 das?
1 da?
9 das?
1 da?
1 da?
1 da?
1 da?
5 das?
2 das?
2 das?
1 da?
318 das?
2 das?
1 da?
4 das?
3 das?
1 da?
3 das?
1 da?
2 das?
1 da?
1 da?
15 das?
1 da?
14 das?
8 das?
3 das?
3 das?
336 das?

CERCO PERIMETRICO

19

COSTO

M1

M2

1923.15

2001.80

1085.86

1,247.44
2,001.80
1,085.86

6243.23

76.48

6166.75

15116.59

9.88

151.14

22.75

25.02

92.10

11.27

3111.90

15,032.37
9.88
151.14
22.75
25.02
92.10
11.27
3,111.90
763.53
1,081.11
1,267.26
355.62
355.62

763.53

1081.11

1267.26

439.84

355.62

84.22

11403.83

11,403.83
611.87
10,791.96
829.76
1.71
828.05
25.38
802.67
1,690.28
167.76
1,522.51
566.20
272.22
684.09
8,499.14

611.87

10791.96

829.76

1.71

828.05

25.38

802.67

1690.28

167.76

1522.51

566.20

272.22

684.09

54109.75

ITEM

NOMBRE DE TAREA

01.04.14.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

01.04.14.02

MOVIMIENTO DE TIERRAS

01.04.14.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

01.04.14.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

01.04.14.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

01.04.14.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

01.04.14.03

OBRAS DE CONCRETO ARMADO

01.04.14.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

01.04.14.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

01.04.14.03.03

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

01.04.14.03.04

MURO DE LADRILLO SOGA E=20cm MEZCLA 1:5 (CEMENTO:ARENA)

01.04.14.04

OTROS

01.04.14.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

01.04.14.04.02

PINTURA EN MUROS

01.04.14.05
01.04.14.05.01
01.04.14.05.02
02
02.01
02.01.01
02.01.01.01
02.01.01.01.01
02.01.01.02

DURACION

ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CERCO
SUBSISTEMA DE ALMOZANCHE
AGUA POTABLE
SISTEMA DE DISTRIBUCION L=19,972 .00 m
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML
MOVIMIENTO DE TIERRAS

02.01.01.02.01

EXCAVACION MANUAL TERRENO SUELTO/ML 0.50X0.70 (APORTE COMUNAL)

02.01.01.02.02

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

02.01.01.02.03

EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA

02.01.01.02.04

REFINE NIVELACION Y FONDOS PARA TUBERIA DE AGUA

02.01.01.02.05

CAMA DE APOYO (MATERIAL DE PRESTAMO)

02.01.01.02.06

RELLENO Y COMPACTADO DE ZANJAS

02.01.01.03

SUMINISTRO E INSTALACION DE TUBERIAS

02.01.01.03.01

TUBERIA PVC SAP CLASE 10, D=90mm

02.01.01.03.02

TUBERIA PVC SAP CLASE 10, D=75mm

02.01.01.03.03

TUBERIA PVC SAP CLASE 10, D=63mm

02.01.01.03.04

TUBERIA PVC SAP CLASE 10, D=1 1/2"

02.01.01.03.05

TUBERIA PVC SAP CLASE 10, D=1"

20

1 da?
44 das?
6 das?
3 das?
2 das?
1 da?
47 das?
17 das?
11 das?
4 das?
15 das?
279 das?
31 das?
11 das?
11 das?
10 das?
1 da?
444 das?
289 das?
289 das?
20 das?
20 das?
124 das?
30 das
8 das?
17 das?
13 das
11 das
14 das
68 das?
5 das?
2 das?
2 das?
13 das?
13 das?

COSTO

M1

M2

427.80

959.12

461.97

173.26

427.80
635.23
461.97
173.26

295.02

28.88

33620.70

7932.24

7,436.11
7,436.11

7855.97

11327.08

6505.41

8682.13

6192.04

2490.09

10420.00

2320.00

8100.00

1567331.99

2,461.82

419147.79

332614.97

9138.89

9138.89

206900.39

112603.89

9058.24

1286.81

20560.20

35210.80

28180.45

109985.58

31354.76

8542.46

8606.60

13567.53

27638.41

ITEM
02.01.01.03.06
02.01.01.03.07
02.01.01.04
02.01.01.04.01
02.01.01.04.02
02.01.02
02.01.02.01

NOMBRE DE TAREA
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DISTRIBUCION (Almozanche)
VALVULAS (49 UND)
TRABAJOS PRELIMINARES

02.01.02.01.01

LIMPIEZA DE TERRENO

02.01.02.01.02

TRAZO Y REPLANTEO

02.01.02.02
02.01.02.02.01
02.01.02.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO ARMADO

02.01.02.03.01

CONCRETO F'C=175 KG/CM2

02.01.02.03.02

ACERO FY= 4,200Kg/cm2

02.01.02.03.03
02.01.02.04
02.01.02.04.01
02.01.02.05

ENCOFRADO Y DESENCOFRADO
TARRAJEOS
TARRAJEO MORTERO 1:2 , E=1.5CM
ACCESORIOS

02.01.02.05.01

COLOCACION DE ACCESORIOS

02.01.02.05.02

SUMINISTRO Y COLOCACION DE TAPA METALICA

02.01.02.05.03

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 90mm

02.01.02.05.04

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 75mm

02.01.02.05.05

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 63mm

02.01.02.05.06

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 1 1/2"

02.01.02.05.07

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 1"

02.01.02.05.08

SUMINISTRO DE VALVULA DE PURGA 1" x 90mm

02.01.02.05.09

SUMINISTRO DE VALVULA DE PURGA 1" x 75mm

02.01.02.05.10

SUMINISTRO DE VALVULA DE PURGA 1" x 63mm

02.01.02.05.11

SUMINISTRO DE VALVULA DE PURGA 1" x 1"

02.01.02.05.12

SUMINISTRO DE VALVULA DE COMPUERTA 90mm

02.01.02.05.13

SUMINISTRO DE VALVULA DE COMPUERTA 75mm

02.01.02.05.14

SUMINISTRO DE VALVULA DE COMPUERTA 63mm

02.01.02.05.15

SUMINISTRO DE VALVULA DE COMPUERTA 1 1/2"

02.01.02.05.16

SUMINISTRO DE VALVULA DE COMPUERTA 1"

02.01.03

DURACION

10 das?
23 das?
63 das?
1 da?
1 da?
217 das?
2 das?
1 da?
1 da?
6 das?
6 das?
12 das?
1 da?
3 das?
8 das?
3 das?
3 das?
198 das?
4 das?
9 das?
1 da?
1 da?
1 da?
2 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
2 das?
1 da?
42 das?

TUBERIA PVC SAP CLASE 10, D=1/2"

CRUCES DE CARRETERA (7 UND)

21

COSTO

M1

M2

13730.65

6545.16

6590.13

9.28

6580.85

17882.31

42.22

18.54

23.69

423.77

423.77

6245.49

2198.44

1847.42

2199.63

856.82

856.82

10314.00

454.49

2274.32

56.66

44.66

119.49

75.32

73.32

712.54

1144.06

398.58

1934.26

752.54

1470.00

250.00

191.42

362.34

5719.31

ITEM
02.01.03.01

NOMBRE DE TAREA

02.01.03.01.01

LIMPIEZA DE TERRENO

02.01.03.01.02

TRAZO Y REPLANTEO PRELIMINAR

02.01.03.02
02.01.03.02.01
02.01.03.03
02.01.03.03.01
02.01.03.04
02.01.03.04.01
02.01.03.04.02
02.01.04
02.01.04.01

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE CARRETERA 2
CRUCES DE ALCANTARILLA (02 UNIDAD)
TRABAJOS PRELIMINARES

02.01.04.01.01

LIMPIEZA DE TERRENO

02.01.04.01.02

TRAZO Y REPLANTEO PRELIMINAR

02.01.04.02
02.01.04.02.01
02.01.04.03
02.01.04.03.01
02.01.04.04

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS

02.01.04.04.01

COLOCACION DE ACCESORIOS

02.01.04.04.02

SUMINISTRO DE ACCESORIOS CRUCE ALCANTARILLA 2

02.01.05
02.01.05.01
02.01.05.01.01
02.01.05.01.02
02.01.05.02
02.01.05.02.01
02.01.05.03
02.01.05.03.01
02.01.05.04
02.01.05.04.01
02.01.05.04.02
02.01.06

DURACION

5 das?
4 das?
1 da?
34 das?
34 das?
1 da?
1 da?
2 das?
1 da?
1 da?
40 das?
2 das?
1 da?
1 da?
4 das?
4 das?
1 da?
1 da?
2 das?
1 da?
1 da?
41 das?
2 das?
1 da?
1 da?
3 das?
3 das?
1 da?
1 da?
2 das?
1 da?
1 da?
60 das?
1 da?
5 das?

TRABAJOS PRELIMINARES

CRUCES DE RIACHUELO Y ACEQUIAS (01 UNIDAD)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE RIACHUELO Y ACEQUIAS 2
CONEXION DOMICILIARIA (219 UNIDADES)

02.01.06.01

TRAZO Y REPLANTEO PRELIMINAR

02.01.06.02

EXCAVACION MANUAL

22

COSTO

M1

M2

380.92

244.90

136.02

2594.22

2594.22

306.01

306.01

2438.16

64.93

2373.23

2951.61

114.28

73.47

40.81

288.60

288.60

167.74

167.74

2380.99

50.99

2330.00

404.96

38.09

24.49

13.60

183.65

183.65

83.87

83.87

99.34

25.49

73.85

59574.64

54.43

338.17

ITEM

NOMBRE DE TAREA

02.01.06.03

CAMA DE APOYO (MATERIAL DE PRESTAMO)

02.01.06.04

VALVULA COMPUERTA DE BRONCE 1/2"

02.01.06.05

UNION UNIVERSAL DE 1/2"

02.01.06.06

NIPLE FG 1/2"

02.01.06.07

CAJA PARA VALVULA DE 30X30cm

02.01.06.08

SUMINISTRO Y COLOCACION DE TAPA METALICA

02.01.06.09

TUBERIA PVC SAP CLASE 10, D=1/2" (CONEXION URBANA)

02.01.06.10

LAVADERO MULTIUSO DOMICILIAR(104 UND)

02.01.06.10.01

TRAZO Y REPLANTEO

02.01.06.10.02

EXCAVACION MANUAL

02.01.06.10.03

CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PG.

02.01.06.10.04

CONCRETO F'C=175 KG/CM2 LOSA

02.01.06.10.05

ENCOFRADO Y DESENCOFRADO

02.01.06.10.06

ACERO FY= 4,200Kg/cm2

02.01.06.10.07

COLOCACION DE ACCESORIOS

02.01.06.10.08

SUMINISTRO DE ACCESORIOS PARA LAVADERO MULTIUSO

02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.02

LETRINAS ECOLOGICAS (104 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS

02.02.02.01

EXCAVACION MANUAL

02.02.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO

02.02.02.03

RELLENO CON MATERIAL GRAVA Y CANTO RODADO

02.02.02.04

RELLENO CON MATERIAL DE PRESTAMO MANUAL

02.02.02.05

ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m

02.02.03

OBRAS DE CONCRETO CICLOPEO

02.02.03.01

MURO FOSA MEZCLA 1:10 C:H 50% PG

02.02.03.02

ENCOFRADO Y DESENCOFRADO EN MUROS BAJOS

02.02.04
02.02.04.01
02.02.05
02.02.05.01

DURACION

OBRAS DE CONCRETO SIMPLE


CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
OBRAS DE CONCRETO ARMADO
LOSAS ARMADA

02.02.05.01.01

CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA

02.02.05.01.02

ENCOFRADO Y DESENCOFRADO DE LOSA

23

20 das?
28 das?
30 das?
15 das?
25 das?
37 das?
3 das?
52 das?
1 da?
4 das?
2 das?
1 da?
26 das?
3 das?
7 das?
11 das?
282 das?
22 das?
18 das?
4 das?
150 das?
12 das
12 das?
10 das?
5 das?
23 das
49 das?
19 das?
30 das
9 das?
9 das?
73 das?
34 das?
4 das?
20 das?

COSTO

M1

M2

2895.74

8797.23

4236.28

1765.55

6339.12

10164.81

1932.96

23050.34

494.72

265.08

3783.65

2585.42

10311.34

1978.92

964.64

2666.56

441763.46

2902.73

1369.87

1532.86

36790.89

26842.19

959.95

4130.53

1425.52

3432.70

99563.90

63066.98

36496.92

24778.51

24778.51

66976.91

30761.86

16250.59

5973.21

ITEM
02.02.05.01.03
02.02.05.02

NOMBRE DE TAREA
COMPUERTA DE MANTENIMIENTO

02.02.05.02.01

CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA

02.02.05.02.02

ENCOFRADO Y DESENCOFRADO DE TAPA

02.02.05.02.03
02.02.05.03

ACERO FY= 4,200Kg/cm2


ESCALERA

02.02.05.03.01

CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA

02.02.05.03.02

ENCOFRADO Y DESENCOFRADO DE ESCALERA

02.02.05.03.03

ACERO FY= 4,200Kg/cm2

02.02.06

DURACION

ACERO FY= 4,200Kg/cm2

ESTRUCTURA DE MADERA Y COBERTURAS

02.02.06.01

COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)

02.02.06.02

CORREAS DE MADERA DE 2"X2"X10'

02.02.06.03

VIGA DE MADERA ROLLIZO DE 2"X1.8m

02.02.06.04

DINTEL DE MADERA ROLLIZO DE 2"X1.8m

02.02.06.05

PUERTA METALICA 0.85*1.80

02.02.06.06

VENTANA DE ALUMINIO, VIDRIO 10MM

02.02.07
02.02.07.01
02.02.08

MUROS Y TABIQUES
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
REVOQUES Y ENLUCIDOS

02.02.08.01

TARRAJEO, ACABADO CON CEMENTO-ARENA

02.02.08.02

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1 EN CAMARAS

02.02.09
02.02.09.01
02.02.10

PINTURA
PINTURA EN CALAMINAS DE LETRINA (ESMALTE Y ANTIC.)
SISTEMA DE DESAGUE Y AGUA POTABLE

02.02.10.01

VENTILACION PARA LETRINA ECOLOGICA D=4"

02.02.10.02

TUBERIA PVC SAP CLASE 10, D=1/2"

02.02.10.03

TUBERIA PVC SAL CLASE 7.5, D=2"

02.02.10.04

REVESTIMIENTO DE PISO,ZOCALO DUCHA C/MAYOLICA BLANCA DE 25X25 CM

02.02.10.05

COLOCACION DE ACCESORIOS DE AGUA Y DESAGE

02.02.10.06
02.03
02.03.01
02.03.01.01
02.03.01.01.01
02.03.01.02

SUMINISTRO DE ACCESORIOS DE AGUA Y DESAGE


SISTEMA DE LA RED DE ALCANTARILLADO
RED DE ALCANTARILLADO (2,291.8 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS

24

10 das?
4 das?
1 da?
3 das?
1 da?
26 das?
4 das?
22 das
7 das?
40 das?
14 das?
26 das?
6 das?
2 das?
26 das
3 das?
15 das
15 das
105 das
54 das
51 das
13 das?
13 das?
67 das?
7 das?
1 da?
6 das?
15 das
12 das?
26 das
204 das?
204 das?
4 das?
4 das?
200 das?

COSTO

M1

M2

8538.06

2720.06

1170.73

901.71

647.62

33494.99

14517.02

13138.67

5839.30

48871.15

9820.82

8402.71

2595.69

667.70

24842.31

2541.92

31811.42

31811.42

58617.82

26061.12

32556.70

2826.54

2826.54

68623.59

9537.21

1397.13

4628.17

12253.50

1573.58

39234.00

329199.62

329199.62

2043.81

2043.81

83729.09

ITEM
02.03.01.02.01
02.03.01.02.02
02.03.01.02.03
02.03.01.02.04
02.03.01.02.05
02.03.01.02.06
02.03.01.02.07
02.03.01.03
02.03.01.03.01
02.03.01.03.02
02.03.01.04
02.03.01.04.01
02.03.01.05
02.03.01.05.01
02.03.01.05.02
02.03.01.06
02.03.01.06.01
02.03.01.06.01.01
02.03.01.06.02
02.03.01.06.02.01
02.03.01.06.02.02
02.03.01.06.03
02.03.01.06.03.01
02.03.01.06.04
02.03.01.06.04.01
02.03.01.06.04.02
02.03.01.06.04.03
02.03.01.06.05
02.03.01.06.05.01
02.03.01.06.06
02.03.01.06.06.01
02.03.01.07
02.03.01.07.01
02.03.01.07.02
02.03.01.07.03

NOMBRE DE TAREA

DURACION

18 das?
EXCAVACION DE ZANJA,T. ROCA SUELTA
4 das?
REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 160 mm - 250 mm
23 das?
REFINE Y NIVELACION ZANJA TERR.SEMIROCA PARA TUB. 160mm - 250 mm
1 da?
CAMA DE APOYO P/TUBERIA H=0.20, A = 0.60 M
29 das?
RELLENO COMPACTADO CON MATERIAL PROPIO
137 das
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
1 da?
SUMINISTRO E INSTALACION DE LA RED DE ALCANTARILLADO
29 das?
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM
4 das?
SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM
2 das?
ENTIBADO
1 da?
ENTIBADO EN ZANJA EN TERRENO DE ROCA SUELTA
1 da?
PRUEBA HIDRAULICA
9 das?
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 160 MM
9 das?
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 200 MM
5 das?
BUZONES DE INSPECCION
63 das?
TRABAJOS PRELIMINARES
1 da?
TRAZO Y REPLANTEO PRELIMINAR
1 da?
MOVIMIENTO DE TIERRAS
62 das?
EXCAVACION EN ROCA SUELTA
26 das?
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
1 da?
OBRAS DE CONCRETO SIMPLE
2 das?
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
2 das?
OBRAS DE CONCRETO ARMADO
24 das?
CONCRETO F'C=210 KG/CM2
3 das?
ENCOFRADO Y DESENCOFRADO NORMAL
16 das?
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
1 da?
REVESTIMIENTOS
6 das?
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTI 6 das?
TAPA DE CONCRETO
5 das?
TAPA DE INSPECCION DE 0.60 M
5 das?
CONEXION DOMICILIARIA (115 UNIDADES)
61 das?
TRAZO Y REPLANTEO PRELIMINAR
2 das?
EXCAVACION MANUAL EN TERRENO SUELTO 0.60X1.0M
59 das?
CAMA DE APOYO P/TUBERIA H=0.10M
8 das?
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL P/ALCANT.

25

COSTO

M1

M2

15755.65

4235.50

1370.37

63.90

8033.26

53835.04

435.35

54765.62

29830.58

24935.04

539.21

539.21

3512.52

2392.60

1119.91

56034.58

93.70

93.70

3791.36

3198.55

592.81

2753.41

2753.41

20741.78

14697.00

5468.67

576.10

1959.43

1959.43

26694.90

26694.90

24264.12

573.25

4555.32

1188.91

ITEM
02.03.01.07.04
02.03.01.07.05
02.03.01.08
02.03.01.08.01
02.03.01.08.01.01
02.03.01.08.02
02.03.01.08.02.01
02.03.01.08.02.02
02.03.01.08.02.03
02.03.01.08.02.04
02.03.01.08.02.05
02.03.01.08.03
02.03.01.08.03.01
02.03.01.08.03.01
02.03.01.08.04
02.03.01.08.04.01
02.03.01.09
02.03.01.09.01
02.03.01.09.01.01
02.03.01.09.02
02.03.01.09.02.01
02.03.01.09.02.02
02.03.01.09.03
02.03.01.09.03.01
02.03.01.09.04
02.03.01.09.04.01
02.03.01.09.04.02
02.03.01.09.04.03
02.03.01.09.05
02.03.01.09.05.01
02.03.01.09.06
02.03.01.09.06.01
02.03.01.10
02.03.01.10.01
02.04

NOMBRE DE TAREA

DURACION

39 das?
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
1 da?
EMISOR GENERAL (1040.40 ML)
134 das?
TRABAJOS PRELIMINARES
3 das?
TRAZO Y REPLANTEO DURANTE LA OBRA P/LINEAS DE DESAGUE
3 das?
MOVIMIENTO DE TIERRAS
131 das?
EXCAVACION MANUAL DE TERRENO NORMAL
54 das
REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
7 das?
CAMA DE APOYO P/TUBERIA H=0.10M
13 das?
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
48 das
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
2 das?
SUMINISTRO E INSTALACION DE TUBERIAS
3 das?
SUM. E INST. TUB PVC UF ISO 4435 DN 250 MM
3 das?
SUM. E INST. TUB PVC SAP ISO 1452 DN 110 MM
5 das?
PRUEBA HIDRAULICA
7 das?
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 250 MM
7 das?
BUZONES DE INSPECCION (RED EMISOR)
32 das?
TRABAJOS PRELIMINARES
1 da?
TRAZO Y REPLANTEO PRELIMINAR
1 da?
MOVIMIENTO DE TIERRAS
31 das?
EXCAVACION EN ROCA SUELTA
6 das?
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
1 da?
OBRAS DE CONCRETO SIMPLE
1 da?
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
1 da?
OBRAS DE CONCRETO ARMADO
7 das?
CONCRETO F'C=210 KG/CM2
1 da?
ENCOFRADO Y DESENCOFRADO NORMAL
4 das?
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
1 da?
REVESTIMIENTOS
2 das?
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTI 2 das?
TAPA DE CONCRETO
2 das?
TAPA DE INSPECCION DE 0.60 M
2 das?
PRUEBA DE LABORATORIO
15 das?
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
15 das?
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
370 das?
RELLENO Y COMP.MAT.PROPIO EN ZANJAS

26

COSTO

M1

M2

2995.36

14951.28

101005.18

1437.08

1437.08

35674.30

16518.27

8453.60

2095.71

6522.14

2084.58

62008.67

251.51

61757.16

1885.14

1885.14

2924.19

4.16

4.16

182.21

153.73

28.48

121.70

121.70

1335.48

836.68

262.93

235.87

94.21

94.21

1186.44

1186.44

381.30

381.30

377221.12

2,542.50

ITEM
02.04.01

NOMBRE DE TAREA

02.04.01.01

LIMPIEZA DE TERRENO

02.04.01.02

TRAZO Y REPLANTEO PRELIMINAR DE OBRA

02.04.01.03

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO

02.04.02

CAMARA DE BOMBEO

02.04.02.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.02.02

MOVIMIENTO DE TIERRAS

02.04.02.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

02.04.02.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.02.02.03

ENROCADO DE CIMENTACION

02.04.02.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.02.02.05
02.04.02.03
02.04.02.03.01

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA


OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"

02.04.02.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.02.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.02.03.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

02.04.02.03.05

MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5

02.04.02.04

EQUIPOS ELECTROMECANICOS

02.04.02.04.01

SUMINISTRO Y COLOCACION DE ELECTROBOMBA

02.04.02.04.02

SUB ESTACION ALCANTARILLADO

02.04.02.05

OTROS

02.04.02.05.01

COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO

02.04.02.05.02

TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=70cm, L=3.2m

02.04.02.05.03

VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M

02.04.02.05.04

PUERTA METALICA 0.85*1.80

02.04.02.05.05

VENTANA DE ALUMINIO, VIDRIO 10MM

02.04.02.05.06

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

02.04.02.05.07

JUNTAS DE WATER STOP e=1 PULG

02.04.02.05.08
02.04.02.06

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE


ACCESORIOS

02.04.02.06.01

COLOCACION DE ACCESORIOS

02.04.02.06.02

SUMINISTRO DE ACCESORIOS CAMARA DE BOMBEO

02.04.03
02.04.03.01

DURACION

138 das?
5 das
4 das?
1 da?
55 das?
1 da?
48 das?
21 das
1 da?
1 da?
2 das?
1 da?
22 das?
1 da?
10 das?
5 das?
5 das?
1 da?
3 das?
2 das?
1 da?
20 das?
1 da?
1 da?
1 da?
1 da?
1 da?
6 das?
1 da?
1 da?
2 das?
1 da?
1 da?
55 das?
1 da?

TRABAJOS PRELIMINARES

CANAL DE INGRESO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

27

COSTO

M1

M2

6781.26

2,542.50

1494.90

2743.86

2542.50

2,542.50

107446.56

20.01

4999.16

3114.09

50.65

390.50

370.95

1072.98

23239.14

368.14

4843.82

3489.82

14192.71

344.64

72655.10

22942.76

49712.34

4179.77

608.15

834.08

361.95

238.87

78.21

1114.87

751.56

192.07

2353.38

178.46

2174.92

644.94

2.78

ITEM
02.04.03.02

NOMBRE DE TAREA

02.04.03.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

02.04.03.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.03.02.03

ENROCADO DE CIMENTACION

02.04.03.02.04
02.04.03.03

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO

02.04.03.03.01

SOLADO BASE PARA PTAR E=4"

02.04.03.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.03.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.03.03.04
02.04.03.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

02.04.03.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

02.04.03.04.02

JUNTAS DE WATER STOP e=1 PULG

02.04.03.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

02.04.04

DESARENADOR

02.04.04.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.04.02

MOVIMIENTO DE TIERRAS

02.04.04.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

02.04.04.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.04.02.03

ENROCADO DE CIMENTACION

02.04.04.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.04.02.05
02.04.04.03
02.04.04.03.01

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"

02.04.04.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.04.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.04.03.04
02.04.04.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

02.04.04.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

02.04.04.04.02

JUNTAS DE WATER STOP e=1 PULG

02.04.04.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

02.04.04.05

ACCESORIOS

02.04.04.05.01

COLOCACION DE ACCESORIOS

02.04.04.05.02

SUMINISTRO DE ACCESORIOS DESARENADOR

02.04.05

DURACION

8 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
49 das?
1 da?
1 da?
1 da?
55 das?
1 da?
11 das?
3 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
47 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
55 das?

MOVIMIENTO DE TIERRAS

MEDIDOR PARSHALL

28

COSTO

M1

M2

108.56

37.32

3.63

62.67

4.94

469.33

59.19

91.91

134.61

183.62

64.27

12.07

31.92

20.28

4704.02

11.65

592.99

196.63

29.49

263.09

58.77

45.01

2091.71

247.94

457.06

580.00

806.71

249.72

34.99

129.03

85.70

1757.96

203.96

1554.00

966.98

ITEM

NOMBRE DE TAREA

02.04.05.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.05.02

MOVIMIENTO DE TIERRAS

02.04.05.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

02.04.05.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.05.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.05.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

02.04.05.03

OBRAS DE CONCRETO ARMADO

02.04.05.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.05.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.05.03.03
02.04.05.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

02.04.05.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

02.04.05.04.02

JUNTAS DE WATER STOP e=1 PULG

02.04.05.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

02.04.05.05
02.04.05.05.01
02.04.05.05.02
02.04.06

ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS MEDIDOR PARSHALL
SEDIMENTADOR PRIMARIO

02.04.06.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.06.02

MOVIMIENTO DE TIERRAS

02.04.06.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

02.04.06.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.06.02.03

ENROCADO DE CIMENTACION

02.04.06.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.06.02.05
02.04.06.03

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO

02.04.06.03.01

SOLADO BASE PARA PTAR E=4"

02.04.06.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.06.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.06.03.04
02.04.06.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

02.04.06.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

02.04.06.04.02

JUNTAS DE WATER STOP e=1 PULG

02.04.06.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

02.04.06.05

DURACION

1 da?
7 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
51 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
55 das?
1 da?
19 das?
1 da?
2 das?
2 das?
1 da?
6 das?
7 das?
1 da?
3 das?
2 das?
1 da?
45 das?
5 das?
1 da?
1 da?
2 das?

ACCESORIOS

29

COSTO

M1

M2

15.63

92.00

50.96

15.25

13.21

12.59

615.56

106.05

196.46

313.05

188.29

115.93

66.51

5.85

55.49

25.49

30.00

10495.45

44.73

1448.23

169.74

115.12

725.90

34.91

402.57

6506.55

684.10

1382.49

1459.95

2980.02

1562.46

1001.14

345.85

215.47

933.48

ITEM
02.04.06.05.01
02.04.06.05.02
02.04.07

NOMBRE DE TAREA
SUMINISTRO DE ACCESORIOS SEDIMENTADOR 1
WETLAND SFS

02.04.07.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.07.02

MOVIMIENTO DE TIERRAS

02.04.07.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

02.04.07.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.07.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.07.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

02.04.07.03

DURACION

COLOCACION DE ACCESORIOS

SUMINISTRO E INSTALACION DE TUBERIAS

02.04.07.03.01

SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM

02.04.07.03.02

SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM

02.04.07.03.03

SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM; DISTRIBUIDOR CRIBADO,L=33m

02.04.07.04

OTROS

02.04.07.04.01

MATERIAL DE AMORTIGUACION

02.04.07.04.02

MATERIAL DE ESTRATO

02.04.07.04.03

VEGETAL FITODEPURADOR

02.04.07.04.04

MANTA DE GEOMEMBRANA

02.04.07.05

ACCESORIOS

02.04.07.05.01

COLOCACION DE ACCESORIOS

02.04.07.05.02

SUMINISTRO DE ACCESORIOS WETLAND SFS

02.04.08

CAMARA DE CONTACTO (2m3)

02.04.08.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.08.02

MOVIMIENTO DE TIERRAS

02.04.08.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

02.04.08.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.08.02.03

ENROCADO DE CIMENTACION

02.04.08.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.08.02.05

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

02.04.08.03
02.04.08.03.01

OBRAS DE CONCRETO ARMADO


SOLADO BASE PARA PTAR E=4"

02.04.08.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.08.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.08.03.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

02.04.08.04

OTROS

30

1 da?
1 da?
209 das?
4 das?
205 das?
5 das?
79 das?
4 das?
89 das
3 das?
1 da?
1 da?
1 da?
28 das?
1 da?
9 das?
10 das
8 das?
4 das?
3 das?
1 da?
206 das?
1 da?
23 das?
1 da?
3 das?
5 das?
2 das?
3 das?
9 das?
1 da?
5 das?
1 da?
2 das?
187 das?

COSTO

M1

M2

101.98

831.50

134109.21

2598.87

26131.83

5661.63

6071.93

780.95

13617.32

1555.80

308.93

145.81

1101.06

102498.63

2161.78

39632.62

8826.42

51877.81

1324.08

560.88

763.20

17571.30

31.17

2610.06

111.12

165.42

1944.90

222.85

165.77

10268.81

1832.92

2282.46

735.22

5418.22

1623.82

ITEM

NOMBRE DE TAREA

DURACION

02.04.08.04.01

MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5

02.04.08.04.02

COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)

02.04.08.04.03

CORREAS DE MADERA DE 2"X2"X10'

02.04.08.04.04

VIGA DE MADERA ROLLIZO DE 2"X1.8m

02.04.08.04.05

DINTEL DE MADERA ROLLIZO DE 2"X1.8m

02.04.08.04.06

PUERTA METALICA 0.85*1.80

02.04.08.04.07

VENTANA DE ALUMINIO, VIDRIO 10MM

02.04.08.04.08

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

02.04.08.04.09

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

02.04.08.05
02.04.08.05.01
02.04.08.05.02
02.04.09

ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAMARA DE CONTACTO
LECHO DE SECADO DE LODOS

02.04.09.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.09.02

MOVIMIENTO DE TIERRAS

02.04.09.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

02.04.09.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.09.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.09.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

02.04.09.03
02.04.09.03.01

OBRAS DE CONCRETO SIMPLE


ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.09.03.02

CONCRETO FC=175 KG/CM2

02.04.09.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.09.04

SUMINISTRO E INSTALACION DE TUBERIAS

02.04.09.04.01

SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM

02.04.09.04.02

SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM; DISTRIBUIDOR CRIBADO,L=6.3M

02.04.09.05

OTROS

02.04.09.05.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

02.04.09.05.02

JUNTAS DE WATER STOP e=1 PULG

02.04.09.05.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

02.04.09.05.04

COLOCACION DE FILTROS DE GRAVA

02.04.09.05.05

COLOCACION DE FILTROS DE ARENA

02.04.09.05.06

COLOCACION DE LADRILLOS CON ARENA

02.04.09.05.07

COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO

02.04.09.05.08

TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=0.80m, L=3.9m

31

1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
3 das?
2 das?
1 da?
206 das?
1 da?
13 das?
1 da?
3 das?
2 das?
3 das?
4 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
200 das?
2 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?

COSTO

M1

M2

387.74

146.07

107.73

24.96

12.84

238.87

78.21

612.59

14.82

3037.44

484.40

2553.04

13516.43

36.79

768.01

128.10

155.11

329.14

155.65

2198.93

761.06

1370.25

67.63

668.11

546.40

121.71

3677.87

351.91

167.60

72.29

235.56

163.01

853.29

471.35

1000.90

ITEM
02.04.09.05.09
02.04.09.06

NOMBRE DE TAREA
ACCESORIOS

02.04.09.06.01

COLOCACION DE ACCESORIOS

02.04.09.06.02

SUMINISTRO DE ACCESORIOS LECHO DE SECADO

02.04.10

CAJA DE CONTROL DE VALVULAS

02.04.10.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.10.02

MOVIMIENTO DE TIERRAS

02.04.10.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

02.04.10.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.10.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.10.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

02.04.10.03

OBRAS DE CONCRETO ARMADO

02.04.10.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.10.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.10.03.03
02.04.10.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

02.04.10.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

02.04.10.04.02

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

02.04.10.05

ACCESORIOS

02.04.10.05.01

COLOCACION DE ACCESORIOS

02.04.10.05.02

SUMINISTRO DE ACCESORIOS CAJA DE VALVULAS

02.04.11

SEALIZACION

02.04.11.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.11.02

ACCESORIOS

02.04.11.02.01

COLOCACION DE SEALIZACION

02.04.11.02.02

SUMINISTRO DE SEALIZACION

02.04.12

FORESTACION

02.04.12.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.12.02

CERCO FORESTAL

02.04.12.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

02.04.12.02.02

RELLENO Y COMPACTADO CON MATERIALCOMPUS

02.04.12.02.03
02.04.13

DURACION

1 da?
2 das?
1 da?
1 da?
206 das?
1 da?
7 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
198 das?
1 da?
1 da?
3 das?
2 das?
1 da?
3 das?
1 da?
2 das?
1 da?
1 da?
15 das?
1 da?
14 das?
6 das
4 das?
4 das?
218 das?
1 da?
59 das?

VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M

SEMBRIO DE ARBOLES
CERCO PERIMETRICO

02.04.13.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

02.04.13.02

MOVIMIENTO DE TIERRAS

32

COSTO

M1

M2

361.95

6166.73

101.98

6064.75

4821.14

2.47

37.81

5.70

6.25

23.07

2.78

777.22

190.88

270.28

316.06

109.96

88.90

21.06

3893.68

280.44

3613.24

528.81

1.22

527.59

18.13

509.46

2321.84

229.07

2092.76

778.26

374.18

940.31

73313.17

583.52

1308.50

ITEM

NOMBRE DE TAREA

02.04.13.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

02.04.13.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

02.04.13.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

02.04.13.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

02.04.13.03

OBRAS DE CONCRETO ARMADO

02.04.13.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

02.04.13.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

02.04.13.03.03

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

02.04.13.03.04

MURO DE LADRILLO SOGA E=20cm MEZCLA 1:5 (CEMENTO:ARENA)

02.04.13.04
02.04.13.04.01
02.04.13.04.02
02.04.13.05
02.04.13.05.01
02.04.13.05.02
03
03.01
03.01.01
03.01.01.01
03.01.01.01.01
03.01.01.02

OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CERCO
SUBSISTEMA DE COATA
AGUA POTABLE
SISTEMA DE DISTRIBUCION L=5,708 .00 m
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML
MOVIMIENTO DE TIERRAS

03.01.01.02.01

EXCAVACION MANUAL TERRENO SUELTO/ML 0.50X0.70

03.01.01.02.02

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

03.01.01.02.03

EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA

03.01.01.02.04

REFINE NIVELACION Y FONDOS PARA TUBERIA DE AGUA

03.01.01.02.05

CAMA DE APOYO (MATERIAL DE PRESTAMO)

03.01.01.02.06
03.01.01.03

RELLENO Y COMPACTADO DE ZANJAS


SUMINISTRO E INSTALACION DE TUBERIAS

03.01.01.03.01

TUBERIA PVC SAP CLASE 10, D=90mm

03.01.01.03.02

TUBERIA PVC SAP CLASE 10, D=75mm

03.01.01.03.03

TUBERIA PVC SAP CLASE 10, D=63mm

03.01.01.03.04

TUBERIA PVC SAP CLASE 10, D=1 1/2"

03.01.01.03.05

PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA

03.01.01.04
03.01.01.04.01

DURACION

9 das?
4 das?
3 das?
1 da?
63 das?
22 das?
14 das?
6 das?
21 das?
141 das?
21 das
15 das?
8 das?
7 das
1 da?
367 das?
352 das?
352 das?
6 das?
6 das?
129 das?
40 das
15 das?
14 das?
35 das
34 das
38 das
57 das?
2 das?
4 das?
3 das?
6 das?
7 das?
55 das?
1 da?

ACCESORIOS
COLOCACION DE ACCESORIOS

33

COSTO

M1

M2

630.28

236.34

402.50

39.38

45802.07

10819.51

10683.74

15423.85

8874.97

11823.26

8433.32

3389.94

13795.83

3135.83

10660.00
1097330.09
183991.19
114417.44
2611.90
2611.90

174,649.56 285,479.21
4,556.03 59,881.04
2,611.90
2,611.90
2,611.90

49954.35

7934.49

16997.07

1029.45

5876.11

10063.25

8053.98

55800.62

13989.73

20501.91

13208.15

6230.22

1870.61

6050.59

9.28

ITEM
03.01.01.04.02
03.01.02
03.01.02.01
03.01.02.01.01
03.01.02.01.02
03.01.02.02
03.01.02.02.01
03.01.02.03

NOMBRE DE TAREA
VALVULAS (23 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO ARMADO

03.01.02.03.01

CONCRETO F'C=175 KG/CM2

03.01.02.03.02

ACERO FY= 4,200Kg/cm2

03.01.02.03.03

ENCOFRADO Y DESENCOFRADO

03.01.02.04
03.01.02.04.01
03.01.02.05

TARRAJEOS
TARRAJEO MORTERO 1:2 , E=1.5CM
ACCESORIOS

03.01.02.05.01

COLOCACION DE ACCESORIOS

03.01.02.05.02

SUMINISTRO Y COLOCACION DE TAPA METALICA

03.01.02.05.03

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 75mm

03.01.02.05.04

SUMINISTRO DE VALVULAS DE AIRE 1/2" x 63mm

03.01.02.05.05

SUMINISTRO DE VALVULA DE PURGA 1" x 90mm

03.01.02.05.06

SUMINISTRO DE VALVULA DE PURGA 1" x 75mm

03.01.02.05.07

SUMINISTRO DE VALVULA DE PURGA 1" x 63mm

03.01.02.05.08

SUMINISTRO DE VALVULA DE COMPUERTA 90mm

03.01.02.05.09

SUMINISTRO DE VALVULA DE COMPUERTA 75mm

03.01.02.05.10

SUMINISTRO DE VALVULA DE COMPUERTA 63mm

03.01.02.05.11
03.01.03
03.01.03.01

SUMINISTRO DE VALVULA DE COMPUERTA 1 1/2"


CRUCES DE CARRETERA (01 UND)
TRABAJOS PRELIMINARES

03.01.03.01.01

LIMPIEZA DE TERRENO

03.01.03.01.02

TRAZO Y REPLANTEO PRELIMINAR

03.01.03.02
03.01.03.02.01
03.01.03.03
03.01.03.03.01
03.01.03.04
03.01.03.04.01

DURACION

1 da?
303 das?
2 das?
1 da?
1 da?
3 das?
3 das?
6 das?
1 da?
1 da?
4 das?
2 das?
2 das?
292 das?
2 das?
4 das?
3 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
3 das?
10 das?
2 das?
1 da?
1 da?
5 das?
5 das?
1 da?
1 da?
2 das?
1 da?

SUMINISTRO DE ACCESORIOS DISTRIBUCION (Coata)

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS

34

COSTO

M1

M2

6041.31

11965.51

3,510.07

2930.60

706.87
19.82
8.70
11.12
198.98
198.98
488.07

1030.95

19.82
8.70
11.12
198.98
198.98

867.17

1032.48

488.07

2,442.53
1,030.95
867.17
544.41

402.18

402.18

8413.93

1,067.54

213.33

1067.54

1,067.54

133.98

39.83

712.54

2860.15

797.16

376.27

1176.00

750.00

287.13

1399.44

1,057.96

370.60

341.48
54.42
34.99
19.43
287.06
287.06

524.59

524.59

449.84

9.28

54.42
34.99
19.43
370.60

83.54
83.54
524.59
524.59
449.84
9.28

ITEM
03.01.03.04.02
03.01.04
03.01.04.01
03.01.04.01.01
03.01.04.01.02
03.01.04.02
03.01.04.02.01
03.01.04.03
03.01.04.03.01
03.01.04.04
03.01.04.04.01
03.01.04.04.02
03.01.05
03.01.05.01

NOMBRE DE TAREA
CRUCES DE ALCANTARILLA (01 UNIDAD)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE ALCANTARILLA 3
CRUCES DE RIACHUELO Y ACEQUIAS (01 UNIDAD)
TRABAJOS PRELIMINARES

03.01.05.01.01

LIMPIEZA DE TERRENO

03.01.05.01.02

TRAZO Y REPLANTEO PRELIMINAR

03.01.05.02
03.01.05.02.01
03.01.05.03
03.01.05.03.01
03.01.05.04

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS

03.01.05.04.01

COLOCACION DE ACCESORIOS

03.01.05.04.02

SUMINISTRO DE ACCESORIOS CRUCE RIACHUELO Y ACEQUIAS 3

03.01.06

CONEXION DOMOCILIARIA (239 UNIDADES)

03.01.06.01

TRAZO Y REPLANTEO PRELIMINAR

03.01.06.02

EXCAVACION MANUAL

03.01.06.03

CAMA DE APOYO (MATERIAL DE PRESTAMO)

03.01.06.04

VALVULA COMPUERTA DE BRONCE 1/2"

03.01.06.05

UNION UNIVERSAL DE 1/2"

03.01.06.06

NIPLE FG 1/2"

03.01.06.07

CAJA PARA VALVULA DE 30X30cm

03.01.06.08

SUMINISTRO Y COLOCACION DE TAPA METALICA

03.01.06.09

TUBERIA PVC SAP CLASE 10, D=1/2" (CONEXION URBANA)

03.02
03.02.01

DURACION

1 da?
11 das?
3 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
11 das?
2 das?
1 da?
1 da?
3 das?
3 das?
1 da?
1 da?
2 das?
1 da?
1 da?
38 das?
1 da?
6 das?
11 das
19 das
20 das
20 das?
17 das
25 das
8 das?
168 das?
168 das?

SUMINISTRO DE ACCESORIOS CRUCE CARRETERA 3

SISTEMA DE LA RED DE ALCANTARILLADO


RED DE ALCANTARILLADO (4,012.10 ML)

35

COSTO

M1

M2

440.56

4946.55

41.94

288.57
163.25
104.96
58.30
78.71
78.71
46.60
46.60

4662.65

25.49

4637.16

771.67

183.65

91.53
38.09
24.49
13.60
53.44
53.44

83.87

163.25
104.96
58.30
78.71
78.71
41.94

38.09
24.49
13.60
183.65

83.87

466.05

25.49

440.56

50490.57
452.44

515.68
72.82
442.86

72.82
3160.19

11769.81

5667.71

2362.13

8481.11

13599.50

4924.86

418875.12

125,553.21
125,553.21

418875.12

440.56
4,657.98
(4.66)
(4.66)

4,662.65
25.49
4,637.16
680.14
-

130.21
130.21
83.87
83.87
466.05
25.49
440.56
49,974.89
-

9.58
3,160.19
11,769.81
5,667.71
2,362.13
8,481.11
13,599.50
4,924.86
47,087.10
47,087.10

ITEM
03.02.01.01
03.02.01.01.01
03.02.01.02
03.02.01.02.01
03.02.01.02.02
03.02.01.02.03
03.02.01.02.04
03.02.01.02.05
03.02.01.02.06
03.02.01.02.07
03.02.01.03
03.02.01.03.01
03.02.01.03.02
03.02.01.04
03.02.01.04.01
03.02.01.05
03.02.01.05.01
03.02.01.05.02
03.02.01.06
03.02.01.06.01
03.02.01.06.01.01
03.02.01.06.02
03.02.01.06.02.01
03.02.01.06.02.02
03.02.01.06.03
03.02.01.06.03.01
03.02.01.06.04
03.02.01.06.04.01
03.02.01.06.04.02
03.02.01.06.04.03
03.02.01.06.05
03.02.01.06.05.01
03.02.01.06.06
03.02.01.06.06.01
03.02.01.07

NOMBRE DE TAREA

DURACION

6 das?
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
6 das?
MOVIMIENTO DE TIERRAS
162 das?
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL P/ALCANT.
29 das?
EXCAVACION DE ZANJA,T. ROCA SUELTA
7 das?
REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 160 mm - 250 mm
40 das?
REFINE Y NIVELACION ZANJA TERR.SEMIROCA PARA TUB. 160mm - 250 mm
2 das?
CAMA DE APOYO P/TUBERIA H=0.20, A = 0.60 M
51 das?
RELLENO COMPACTADO CON MATERIAL PROPIO
1 da?
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
1 da?
SUMINISTRO E INSTALACION DE LA RED DE ALCANTARILLADO
9 das?
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM
5 das?
SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM
4 das?
ENTIBADO
2 das?
ENTIBADO EN ZANJA EN TERRENO DE ROCA SUELTA
2 das?
PRUEBA HIDRAULICA
13 das?
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 160 MM
13 das?
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 200 MM
10 das?
BUZONES DE INSPECCION
161 das?
TRABAJOS PRELIMINARES
1 da?
TRAZO Y REPLANTEO PRELIMINAR
1 da?
MOVIMIENTO DE TIERRAS
160 das?
EXCAVACION EN ROCA SUELTA
46 das?
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
1 da?
OBRAS DE CONCRETO SIMPLE
2 das?
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
2 das?
OBRAS DE CONCRETO ARMADO
42 das?
CONCRETO F'C=210 KG/CM2
5 das?
ENCOFRADO Y DESENCOFRADO NORMAL
29 das?
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
2 das?
REVESTIMIENTOS
10 das?
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTI 10 das?
TAPA DE CONCRETO
8 das?
TAPA DE INSPECCION DE 0.60 M
8 das?
CONECCION DOMOCILIARIA (292 UNIDADES)
159 das?

TRABAJOS PRELIMINARES

36

COSTO
3577.96
3577.96

M1

M2

3,577.96
3,577.96
15,868.29
11,539.59

122.33

14063.29

3,557.57

33,148.16
14,456.71
8,109.47
1,624.99
122.33
8,834.66

89409.34

928.57

99953.41

54170.55

99,953.41
45,782.85
54,170.55

1032.34

1032.34

1,032.34
1,032.34

6105.05

3672.08

2432.97

96313.25

4,051.56

5812.76

1,652.31
152.00
152.00
1,500.31
1,500.31

1077.34

4466.31

4466.31

37938.83

26708.43

9938.42

1291.99

3560.95

141025.42
25996.30
8109.47

2396.12

771.13

45782.85

152.00
152.00
6890.10

4,051.56
4,051.56

3560.95

43305.06

43305.06

61999.21

2,020.35

2,467.47

ITEM
03.02.01.07.01
03.02.01.07.02
03.02.01.07.03
03.02.01.07.04
03.02.01.07.05
03.02.01.08
03.02.01.08.01
03.02.01.08.01.01
03.02.01.08.02
03.02.01.08.02.01
03.02.01.08.02.02
03.02.01.08.02.03
03.02.01.08.02.04
03.02.01.08.02.05
03.02.01.08.03
03.02.01.08.03.01
03.02.01.08.04
03.02.01.08.04.01
03.02.01.09
03.02.01.09.01
03.02.01.09.01.01
03.02.01.09.02
03.02.01.09.02.01
03.02.01.09.02.02
03.02.01.09.03
03.02.01.09.03.01
03.02.01.09.04
03.02.01.09.04.01
03.02.01.09.04.02
03.02.01.09.04.03
03.02.01.09.05
03.02.01.09.05.01
03.02.01.09.06
03.02.01.09.06.01
03.02.01.10

NOMBRE DE TAREA

DURACION

5 das?
EXCAVACION MANUAL EN TERRENO SUELTO 0.60X1.0M
154 das?
CAMA DE APOYO P/TUBERIA H=0.10M
20 das?
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
99 das?
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
2 das?
EMISOR GENERAL (85.00 ML)
31 das?
TRABAJOS PRELIMINARES
1 da?
TRAZO Y REPLANTEO DURANTE LA OBRA P/LINEAS DE DESAGUE
1 da?
MOVIMIENTO DE TIERRAS
30 das?
EXCAVACION MANUAL DE TERRENO NORMAL
18 das?
REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
1 da?
CAMA DE APOYO P/TUBERIA H=0.10M
2 das?
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
7 das?
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
1 da?
SUMINISTRO E INSTALACION DE TUBERIAS
1 da?
SUM. E INST. TUB PVC UF ISO 4435 DN 250 MM
1 da?
PRUEBA HIDRAULICA
1 da?
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 250 MM
1 da?
BUZONES DE INSPECCION (RED EMISOR)
16 das?
TRABAJOS PRELIMINARES
1 da?
TRAZO Y REPLANTEO PRELIMINAR
1 da?
MOVIMIENTO DE TIERRAS
15 das?
EXCAVACION EN ROCA SUELTA
1 da?
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
1 da?
OBRAS DE CONCRETO SIMPLE
1 da?
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
1 da?
OBRAS DE CONCRETO ARMADO
3 das?
CONCRETO F'C=210 KG/CM2
1 da?
ENCOFRADO Y DESENCOFRADO NORMAL
1 da?
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
1 da?
REVESTIMIENTOS
1 da?
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTI 1 da?
TAPA DE CONCRETO
1 da?
TAPA DE INSPECCION DE 0.60 M
1 da?
PRUEBA DE LABORATORIO
9 das?
TRAZO Y REPLANTEO PRELIMINAR

37

COSTO

M1

M2

11851.55

1,491.42
528.93

2,467.47

3093.19

7599.81

1491.42

37963.24

7298.41

6,290.45

1350.05

1,007.95
117.45
117.45
890.50
890.50

690.92

171.28

533.06

170.37

4111.19

4111.19

154.07

154.07

1341.31

61.44

1,292.23
2.08
2.08
61.45
61.44

11.42

11.42

60.85

133.62

60.85
60.85
574.64
335.94
105.08
133.62

37.65

37.65

37.65
37.65

593.22

593.22
593.22
180.72

117.45
117.45
2915.69

2.08
2.08
72.87

60.85
574.64
335.94
105.08

593.22
228.78

2,025.19
459.55
690.92
171.28
533.06
170.37
4,111.19
4,111.19
154.07
154.07
49.07
-

11.42
-

48.06

ITEM
03.02.01.10.01
03.03
03.03.01

NOMBRE DE TAREA
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
TRABAJOS PRELIMINARES

03.03.01.01

LIMPIEZA DE TERRENO

03.03.01.02

TRAZO Y REPLANTEO PRELIMINAR DE OBRA

03.03.01.03

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO

03.03.02

CAMARA DE BOMBEO

03.03.02.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.02.02

MOVIMIENTO DE TIERRAS

03.03.02.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

03.03.02.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.02.02.03

ENROCADO DE CIMENTACION

03.03.02.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.02.02.05

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA

03.03.02.03
03.03.02.03.01

OBRAS DE CONCRETO ARMADO


SOLADO BASE PARA PTAR E=4"

03.03.02.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.02.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.02.03.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

03.03.02.03.05
03.03.02.04

MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5


EQUIPOS ELECTROMECANICOS

03.03.02.04.01

SUMINISTRO Y COLOCACION DE ELECTROBOMBA

03.03.02.04.02

SUB ESTACION ALCANTARILLADO SUCASCO

03.03.02.05

OTROS

03.03.02.05.01

COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO

03.03.02.05.02

TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=1.5m, L=4.2m

03.03.02.05.03

VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M

03.03.02.05.04

PUERTA METALICA 0.85*1.80

03.03.02.05.05

VENTANA DE ALUMINIO, VIDRIO 10MM

03.03.02.05.06

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.02.05.07

JUNTAS DE WATER STOP e=1 PULG

03.03.02.05.08
03.03.02.06

DURACION

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE


ACCESORIOS

03.03.02.06.01

COLOCACION DE ACCESORIOS

03.03.02.06.02

SUMINISTRO DE ACCESORIOS CAMARA DE BOMBEO

38

9 das?
174 das?
9 das?
6 das
2 das?
1 da?
67 das?
1 da?
59 das?
25 das
1 da?
2 das?
3 das?
1 da?
27 das?
1 da?
12 das?
7 das?
6 das?
1 da?
3 das?
2 das?
1 da?
25 das?
2 das?
1 da?
1 da?
1 da?
1 da?
7 das?
1 da?
2 das?
2 das?
1 da?
1 da?

COSTO
228.78
494463.78
4876.75
859.06
1475.18
2542.50
121465.12
25.82
6307.10
3838.82
65.36
623.28

M1

M2

180.72
48.06
44,540.32 178,511.06
4,876.75
859.06
1,475.18
2,542.50
2,770.26 20,089.68
25.82
2,744.44
1,783.02
2,744.44
1,094.38
65.36
623.28

456.34

1323.31

29604.56

587.52

5891.56

5110.59

17549.00

17,303.70
587.52
5,891.56
5,110.59
5,714.02

465.89

78590.48

23496.76

55093.72

5249.51

1,002.97

714.37

1000.90

542.93

238.87

78.21

1415.48

1002.97

1,002.97

255.79

1687.65

229.45

1458.20

ITEM
03.03.03

NOMBRE DE TAREA

03.03.03.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.03.02

MOVIMIENTO DE TIERRAS

03.03.03.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

03.03.03.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.03.02.03

ENROCADO DE CIMENTACION

03.03.03.02.04
03.03.03.03
03.03.03.03.01

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"

03.03.03.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.03.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.03.03.04
03.03.03.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

03.03.03.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.03.04.02

JUNTAS DE WATER STOP e=1 PULG

03.03.03.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

03.03.04

DESARENADOR

03.03.04.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.04.02

MOVIMIENTO DE TIERRAS

03.03.04.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

03.03.04.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.04.02.03

ENROCADO DE CIMENTACION

03.03.04.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.04.02.05

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

03.03.04.03
03.03.04.03.01

OBRAS DE CONCRETO ARMADO


SOLADO BASE PARA PTAR E=4"

03.03.04.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.04.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.04.03.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

03.03.04.04

OTROS

03.03.04.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.04.04.02

JUNTAS DE WATER STOP e=1 PULG

03.03.04.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

03.03.04.05
03.03.04.05.01

DURACION

67 das?
1 da?
8 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
61 das?
1 da?
1 da?
1 da?
67 das?
1 da?
11 das?
3 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
59 das?
1 da?
1 da?
1 da?
2 das?
1 da?

CANAL DE INGRESO

ACCESORIOS
COLOCACION DE ACCESORIOS

39

COSTO

M1

M2
-

31.92

694.73
3.14
123.09
42.46
4.13
70.94
5.56
522.85
66.98
100.39
150.79
204.69
45.64
13.72
31.92

22.15

4716.35

129.03

4,630.26
11.71
596.17
197.65
29.65
264.46
59.16
45.24
2,100.26
249.24
458.83
582.48
809.72
164.15
35.12
129.03

86.09

1757.96

1,757.96
203.96

716.88
3.14
123.09
42.46
4.13
70.94
5.56
522.85
66.98
100.39
150.79
204.69
67.79
13.72

11.71
596.17
197.65
29.65
264.46
59.16
45.24
2100.26
249.24
458.83
582.48
809.72
250.25
35.12

203.96

ITEM
03.03.04.05.02
03.03.05

NOMBRE DE TAREA
MEDIDOR PARSHALL

03.03.05.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.05.02

MOVIMIENTO DE TIERRAS

03.03.05.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

03.03.05.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.05.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.05.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

03.03.05.03

OBRAS DE CONCRETO ARMADO

03.03.05.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.05.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.05.03.03
03.03.05.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

03.03.05.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.05.04.02

JUNTAS DE WATER STOP e=1 PULG

03.03.05.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

03.03.05.05

ACCESORIOS

03.03.05.05.01

COLOCACION DE ACCESORIOS

03.03.05.05.02

SUMINISTRO DE ACCESORIOS MEDIDOR PARSHALL

03.03.06

SEDIMENTADOR PRIMARIO

03.03.06.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.06.02

MOVIMIENTO DE TIERRAS

03.03.06.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

03.03.06.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.06.02.03

ENROCADO DE CIMENTACION

03.03.06.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.06.02.05
03.03.06.03
03.03.06.03.01

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"

03.03.06.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.06.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.06.03.04
03.03.06.04

DURACION

1 da?
67 das?
1 da?
7 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
63 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
68 das?
1 da?
22 das?
1 da?
2 das?
2 das?
1 da?
7 das?
9 das?
1 da?
4 das?
2 das?
2 das?
57 das?
6 das?
1 da?

SUMINISTRO DE ACCESORIOS DESARENADOR

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

03.03.06.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.06.04.02

JUNTAS DE WATER STOP e=1 PULG

40

COSTO

M1

M2
-

66.51

1,554.00
961.13
15.63
92.00
50.96
15.25
13.21
12.59
615.56
106.05
196.46
313.05
182.44
115.93
66.51

5.85

55.49

679.75

55.49
25.49
30.00
7,954.83
41.91
1,001.24
211.51
109.98
679.75

39.44

503.63

6720.60

1725.01

6,525.91
640.74
1,690.73
1,246.57
2,947.88
385.76

1093.06

194.69
1,093.06
1,093.06

385.76

385.76

1554.00
966.98
15.63
92.00
50.96
15.25
13.21
12.59
615.56
106.05
196.46
313.05
188.29
115.93

25.49
30.00
10965.32
41.91
1544.32
211.51
109.98

640.74
1690.73
1246.57
3142.56

2,764.30
-

543.07
-

39.44
503.63
194.69
-

ITEM
03.03.06.04.03
03.03.06.05

NOMBRE DE TAREA
ACCESORIOS

03.03.06.05.01

COLOCACION DE ACCESORIOS

03.03.06.05.02

SUMINISTRO DE ACCESORIOS SEDIMENTADOR 1

03.03.07

FILTRO ANAEROBICO ASCENDENTE FAA

03.03.07.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.07.02

MOVIMIENTO DE TIERRAS

03.03.07.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

03.03.07.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.07.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.07.02.04

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M

03.03.07.03

OBRAS DE CONCRETO ARMADO

03.03.07.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.07.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.07.03.03
03.03.07.04

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

03.03.07.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.07.04.02

JUNTAS DE WATER STOP e=1 PULG

03.03.07.04.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

03.03.07.04.04
03.03.07.05

SUMINISTRO MATERIAL DE FILTRO


ACCESORIOS

03.03.07.05.01

COLOCACION DE ACCESORIOS

03.03.07.05.02

SUMINISTRO DE ACCESORIOS FILTRO ANAEROBICO

03.03.08

WETLAND SFS

03.03.08.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.08.02

MOVIMIENTO DE TIERRAS

03.03.08.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

03.03.08.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.08.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.08.02.04
03.03.08.03

DURACION

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


SUMINISTRO E INSTALACION DE TUBERIAS

03.03.08.03.01

SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM

03.03.08.03.02

SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM

03.03.08.03.03

SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM; DISTRIBUIDOR CRIBADO,L=41.2m

03.03.08.04

OTROS

41

2 das?
2 das?
1 da?
1 da?
141 das?
1 da?
75 das?
1 da?
8 das?
1 da?
18 das
47 das
15 das
26 das
6 das
116 das?
28 das
1 da?
7 das?
17 das
13 das?
12 das
1 da?
66 das?
2 das?
64 das?
2 das?
19 das
4 das?
18 das
3 das?
1 da?
1 da?
1 da?
21 das?

COSTO

M1

M2

246.19

933.48

101.98

831.50

154614.46

595.05

4,686.09
209.78
1,676.39
1,081.34
595.05

933.48
101.98
831.50
44,306.98

209.78
4387.34
1081.34

72.57

2638.38

87098.46
14577.78

2,799.92
2,799.92

39165.54

41,810.21
11,777.86
30,032.35

33355.14

39973.51

2,496.77

11157.67

2496.77

2,496.77

1578.93

24740.14

22945.37

6093.20

16852.17

58509.86

47,681.21

632.25

4,543.39
1,060.36
3,483.03
2,276.03
574.75
632.25

5318.53

1819.57

253.84

166.78

1398.96

43463.36

1,819.57
253.84
166.78
1,398.96
42,496.62

1060.36
11046.44
2276.03
2819.63

2,244.88
-

2,244.88
-

ITEM

NOMBRE DE TAREA

03.03.08.04.01

MATERIAL DE AMORTIGUACION

03.03.08.04.02

MATERIAL DE ESTRATO

03.03.08.04.03

VEGETAL FITODEPURADOR

03.03.08.04.04

MANTA DE GEOMEMBRANA

03.03.08.05
03.03.08.05.01
03.03.08.05.02
03.03.09

ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS WETLAND SFS
CAMARA DE CONTACTO (3m3)

03.03.09.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.09.02

MOVIMIENTO DE TIERRAS

03.03.09.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

03.03.09.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.09.02.03

ENROCADO DE CIMENTACION

03.03.09.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.09.02.05
03.03.09.03

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO

03.03.09.03.01

SOLADO BASE PARA PTAR E=4"

03.03.09.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.09.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.09.03.04
03.03.09.04

DURACION

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2


OTROS

03.03.09.04.01

MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5

03.03.09.04.02

COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)

03.03.09.04.03

CORREAS DE MADERA DE 2"X2"X10'

03.03.09.04.04

VIGA DE MADERA ROLLIZO DE 2"X1.8m

03.03.09.04.05

DINTEL DE MADERA ROLLIZO DE 2"X1.8m

03.03.09.04.06

PUERTA METALICA 0.85*1.80

03.03.09.04.07

VENTANA DE ALUMINIO, VIDRIO 10MM

03.03.09.04.08

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.09.04.09
03.03.09.05

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE


ACCESORIOS

03.03.09.05.01

COLOCACION DE ACCESORIOS

03.03.09.05.02

SUMINISTRO DE ACCESORIOS CAMARA DE CONTACTO

03.03.10
03.03.10.01

LECHO DE SECADO DE LODOS


TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

42

1 da?
3 das?
13 das?
4 das?
3 das?
2 das?
1 da?
139 das?
1 da?
21 das?
1 da?
2 das?
4 das?
2 das?
3 das?
9 das?
1 da?
4 das?
2 das?
2 das?
122 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
5 das?
1 da?
4 das?
3 das?
1 da?
139 das?
1 da?

COSTO

M1

M2

2699.10

13885.85

3092.47

23785.95

1120.12

356.92

763.20

27998.27

1435.95

3,478.99
48.29
1,693.78
105.03
152.80
1,435.95

211.41

48.29
2061.46
105.03
152.80

156.27

10006.49
1722.54

1,736.92
1,353.40
383.52

1081.88

5848.66

1876.35

353.16

146.07

107.73

24.96

12.84

238.87

78.21

877.93

1353.40

2,699.10
13,885.85
2,125.73
23,785.95
1,120.12
356.92
763.20
24,482.71
-

367.68
-

211.41
156.27
8,269.56
-

1,339.02
1,081.88
5,848.66
1,839.78
353.16
146.07
107.73
24.96
12.84
238.87
78.21
877.93

36.57

14005.70

14,005.70
739.34
13,266.35
13,466.62

739.34

13266.35

17943.83

4,378.25
68.08

68.08

ITEM
03.03.10.02

NOMBRE DE TAREA

03.03.10.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

03.03.10.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.10.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.10.02.04
03.03.10.03

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO SIMPLE

03.03.10.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.10.03.02

CONCRETO FC=175 KG/CM2

03.03.10.03.03

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.10.04
03.03.10.04.01
03.03.10.04.02
03.03.10.05

SUMINISTRO E INSTALACION DE TUBERIAS


SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM; DISTRIBUIDOR CRIBADO,L=9M
OTROS

03.03.10.05.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.10.05.02

JUNTAS DE WATER STOP e=1 PULG

03.03.10.05.03

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

03.03.10.05.04

COLOCACION DE FILTROS DE GRAVA

03.03.10.05.05

COLOCACION DE FILTROS DE ARENA

03.03.10.05.06

COLOCACION DE LADRILLOS CON ARENA

03.03.10.05.07

COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO

03.03.10.05.08

TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=0.8m, L=5.2m

03.03.10.05.09
03.03.10.06
03.03.10.06.01
03.03.10.06.02
03.03.11

VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M


ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS LECHO DE SECADO
CAJA DE CONTROL DE VALVULAS

03.03.11.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.11.02

MOVIMIENTO DE TIERRAS

03.03.11.02.01

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL

03.03.11.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.11.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.11.02.04
03.03.11.03

DURACION

MOVIMIENTO DE TIERRAS

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO

03.03.11.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.11.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

43

18 das?
1 da?
4 das?
4 das?
5 das?
4 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
132 das?
3 das?
1 da?
1 da?
1 da?
1 da?
4 das?
2 das?
2 das?
1 da?
2 das?
1 da?
1 da?
139 das?
1 da?
9 das?
1 da?
1 da?
1 da?
1 da?
5 das?
2 das?
2 das?

COSTO

M1

M2

965.97

307.33

573.95
266.62
307.33

600.70

600.70
365.27
1,398.03

1539.92
266.62

365.27

2605.74

897.15

1,207.71
897.15

1354.25

354.34

5933.32

310.56
1,579.03
1,332.25
246.78
949.48

425.59

239.43

211.38

4,884.88
425.59
28.06

98.96

458.00

458.00
280.10

316.51
1657.49

1579.03
1332.25
246.78

859.87

1334.53

542.93

6217.74

50.99

6166.75

15223.67

25.02

3,018.49
9.88
47.77
22.75
25.02

92.10

11.27

3111.90

2,960.84
763.53
1,081.11

9.88
151.14
22.75

763.53
1081.11

1,354.25
43.78
-

36.41
1,657.49
859.87
1,334.53
542.93
6,217.74
50.99
6,166.75
12,120.96
-

103.37
-

92.10
11.27
151.06
-

ITEM
03.03.11.03.03
03.03.11.04

NOMBRE DE TAREA
OTROS

03.03.11.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.11.04.02

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

03.03.11.05
03.03.11.05.01
03.03.11.05.02
03.03.12

ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAJA DE VALVULAS
SEALIZACION

03.03.12.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.12.02

ACCESORIOS

03.03.12.02.01
03.03.12.02.02
03.03.13

COLOCACION DE SEALIZACION
SUMINISTRO DE SEALIZACION
FORESTACION

03.03.13.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.13.02

CERCO FORESTAL

03.03.13.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

03.03.13.02.02

RELLENO Y COMPACTADO CON MATERIALCOMPUS

03.03.13.02.03

SEMBRIO DE ARBOLES

03.03.14

CERCO PERIMETRICO

03.03.14.01

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

03.03.14.02

MOVIMIENTO DE TIERRAS

03.03.14.02.01

EXCAVACION MANUAL DE TERRENO SUELTO

03.03.14.02.02

PERFILADO NIVELADO MANUAL DE ZANJA

03.03.14.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

03.03.14.02.04
03.03.14.03

ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M


OBRAS DE CONCRETO ARMADO

03.03.14.03.01

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

03.03.14.03.02

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60

03.03.14.03.03

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

03.03.14.03.04
03.03.14.04

MURO DE LADRILLO SOGA E=20cm MEZCLA 1:5 (CEMENTO:ARENA)


OTROS

03.03.14.04.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

03.03.14.04.02

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE

03.03.14.05
03.03.14.05.01

DURACION

1 da?
129 das?
2 das?
1 da?
4 das?
3 das?
1 da?
3 das?
1 da?
2 das?
1 da?
1 da?
15 das?
1 da?
14 das?
6 das
4 das?
4 das?
151 das?
1 da?
59 das?
9 das?
4 das?
3 das?
1 da?
63 das?
22 das?
14 das?
6 das?
21 das?
74 das?
21 das
15 das?
8 das?
7 das

CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

ACCESORIOS
COLOCACION DE ACCESORIOS

44

COSTO

M1

M2

1267.26

1,116.20

439.84

355.62

151.06
355.62
355.62

84.22

11510.91

611.87

10899.04

11,510.91
611.87
10,899.04

829.76

778.26

829.76
1.71
828.05
25.38
802.67
862.67
230.60
632.07
632.07

374.18

940.31

73313.17

630.28

854.75
583.52
271.23
271.23

236.34

595.39
359.05
236.34

402.50

1.71
828.05
25.38
802.67
2323.36
230.60
2092.76

583.52
1308.50

1,460.69
-

1,460.69
146.19
374.18
940.31
12,137.93
-

39.38

45802.07

10819.51

10683.74

11,542.53
10,819.51
723.02

15423.85

8874.97

11823.26

8433.32

3389.94

13795.83

3135.83

ITEM
03.03.14.05.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
05
05.01
05.02
05.03
05.04

NOMBRE DE TAREA

DURACION

1 da?
IMPACTO AMBIENTAL
449 das?
EVALUACION AMBIENTAL
449 das?
PROGRAMA PARTICIPACION CIUDADANA
1 da?
PROGRAMA DE MITIGACION, PREVENCION Y CORRECCION
1 da?
PROGRAMA MANEJO DE RESIDUOS SOLIDOS
1 da?
PROGRAMA DE MONITOREO AMBIENTAL
1 da?
PROGRAMA DE CONTINGENCIA Y PRIMEROS AUXILIOS
1 da?
PROGRAMA DE CIERRE O ABANDONO DE OBRA
1 da?
MODULO DE CAPACITACION
104 das?
MODULO DE CAPACITACION EN HABITOS DE HIGIENE
1 da?
MODULO DE CAPACITACION EN OPERACION Y MANTENIMIENTO DE AGUA POTABLE
1 da?
MODULO DE CAPACITACION EN OPERACIN Y MANTENIMIENTO DE ALCANTARILLADO
1 da?
MODULO DE CAPACITACION EN OPERACIN Y MANTENIMIENTO DE PLANTA DE TRATAMIENT1 da?
CAPACITACION EN OPERACIN Y MANTENIMIENTO DE LETRINAS COMPOSTERAS
1 da?
OTROS
4 das?
FLETE TERRESTRE
1 da?
MOV. Y DESMOV. DE MAQUINARIAS PARA OBRAS DE AGUA Y ALCANTARILLADO
1 da?
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
1 da?
ALMACEN PARA MATERIALES DE OBRA
1 da?
PORCENTAJE DE AVANCE
PORCENTAJE ACUMULADO DE AVANCE
SUMINISTRO DE ACCESORIOS CERCO

45

COSTO

M1

M2

10660.00

36376.02

2200.00

15,220.00
15,220.00
2,200.00
8,400.00
2,200.00

8474.00

2420.00

2,420.00

4272.02

8410.00

5760.00

480.00

440.00

1240.00

490.00

76952.57

76,952.57
62,072.01
2,542.50
1,438.05
10,900.00

27966.02
2200.00
8400.00

62072.01
2542.50
1438.05
10900.00

5.65

10.68

5.65

16.33

ZADO

OTABLE Y SANEAMIENTO BASICO URBANO Y RURAL EN EL C. P. SUCASCO, ALMOZANCHE Y LA LOCALIDAD DE COATA, DISTRITO DE COATA, PROVINCIA DE PUNO - PUNO

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

425,578.34 348,537.41 862,253.82 710,046.56 946,938.34


### 465,522.73 366,263.06 438,532.28 330,579.99
229,516.10 148,733.94 714,009.89 485,182.61 633,464.59 695,829.64 281,781.28 191,533.82 227,438.70 174,720.91
23,775.24 73,917.13 88,457.79 90,972.15 333,293.48 345,869.57 157,030.38 107,784.74 42,074.38 105,933.52

60,173.44
9,122.37
-

4,220.49

46

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

367.54
367.54
1,056.79
1,056.79
512.63
110.30
156.66
245.67

47

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

234.67
234.67
1,904.75
477.74
1,427.01
144.11
144.11

6,130.37

36,861.84

6,130.36
2,276.86
2,260.95

3,352.07
182.31
104.88

801.71
790.85

6.00

338.92
1,162.57
1,563.39
28,746.39
28,383.28
363.11
4,763.39
12.70
4,750.69
5,412.66

29,602.23

16,177.16

12,701.81

6.00

443.22

6.00

48

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

10.09
433.13

735.92
735.92

5,080.29
2,532.56
2,547.74
12,915.03
5,408.55
2,792.26
4,714.21
286.70
89.34
20.33
177.03
3,778.28
1,734.24
626.10
1,417.93
5,722.37

6,807.04
1,364.88

1,583.33
4,139.04
87.13
31.53
19.90
35.70

1,749.89
1,749.89
3,609.76
1,682.05
1,927.71

53.01

53.01

5,442.16

9,131.93
3,819.46
5,312.48
238.18
238.18

3,023.56
882.88

49

M3

M4

M5

M6

M7

238.18

M8

M9

M10

M11

M12

M13

553.31
95.68
83.02
119.29
20.34
234.98

716.12
67.39
99.37
2,140.68
1,646.44
494.24
8,795.19
222.96
201.98
8.40
12.59
505.45
505.45
8,066.77
8,066.77
856.27
856.27
26.79

26.79
5,977.40
10.10
4.32
5.79
75.61
27.57
35.21
9.16
3.67
119.30
119.30

50

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

2,414.35
1,077.62
764.64
572.10
298.41
298.41
3,059.63
27.83
3,031.80

51

M3

M4

M5

M6

M7

M9

13,418.38
13,418.38
13,418.38

3,334.35
3,334.35
3,334.35

1,851.94
211.12
92.69
118.43
1,640.82
1,640.82

4,829.66
10,998.16

M8

M10

M11

19,758.80 233,631.61 306,422.28 127,434.13

75,941.78

M12
-

M13
-

42,074.38 105,933.52

19,758.80 233,631.61 203,932.06


19,758.80 208,776.69
24,854.92 17,018.24
35,172.90
55,944.49
95,796.44

12.47

76,679.28

12.47

102,480.94 127,421.66
63,745.80
38,735.15 16,596.95
85,593.44
25,231.27

75,941.78

42,074.38

76,679.28
2,437.21

31,529.81
44,411.97

565.81
26,136.32
15,372.24

9.28
9.28

2,437.21
26,817.03

26,817.03

19,439.67

23,637.11

1,703.76

29,596.25

31,842.96

477.79
477.79
15,827.82

15,399.58
10,992.20
4,407.38

3,134.06

8,237.53

1,703.76

29,596.25

4,284.12
4,284.12
27,558.84

52

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

1,703.76

568.71

3,134.06

8,237.53

226.64
446.60
557.62
338.94
513.24
4,275.24
5,148.27
6,775.86
3,382.38
5,347.66
2,015.09

242.53
3,528.00
5,250.00
1,914.20
1,409.10
15,215.01

3,013.65

1,368.28
258.48
166.18
92.30
655.90
655.90

410.33
410.33
218.58
218.58
2,384.74
46.38
2,338.36
3,266.97

1,714.77
272.09
174.93
97.16
1,442.68
1,442.68

53

M3

M4
-

M5

377.42
377.42
76.48
76.48

M6

M7

M8

3,266.96

3,266.96
2,525.98

326.27
326.27
587.10
587.10
1,612.60
178.46
1,434.14
30,609.30

31,399.08

80,982.65

37,743.54

22,147.34
193.85
1,204.46
1,158.09

4,787.58

4,255.63

25,821.72
-

19,590.94
1,546.00
828.19
11,823.90

4,933.25
3,481.24
7,173.90
11,555.06

112.30
19,272.60
8,741.59
3,643.28
13,367.97
20,306.65
473.92
15,064.35

5,392.85

25,821.72

M13

M12

1,225.94
266.65
171.43
95.22
959.29
959.29

M11

M10

M9

12,060.00
6,346.52
2,644.98
4,276.49
12,415.55

8,079.44

1,008.37
6,184.10
3,014.50
1,348.09

6,984.91

54

M3

M4
-

M5

M6

M7

M8

M9

M10

3,774.08 348,343.76 224,013.19 196,956.60 235,547.77 120,915.28


3,774.08
5,296.93
3,774.08
506.76
4,790.17
83,881.83
416.80
2,572.45
83,881.85
416.80
2,572.44

M11

M12

64,645.64 126,987.70

M13

50,492.46

8,832.94

13,147.08

9,684.91

5,268.46

10.59
12,907.91
228.58

4,226.17
5,458.74

5,268.46

46,713.95
46,713.95

96,810.60
96,810.60

30,505.76
30,505.76
96,696.83
28,148.65

167,614.37
53,561.24
114,053.13
46,927.09
46,927.09
44,623.52

8,499.89
3,658.52
2,817.61
2,023.76
36,123.63

11,357.39
16,791.26

67,979.14
67,979.14
50,780.29
7,308.71
9,890.14

20,842.00
15,281.63

68,548.18
45,365.67
20,216.35
2,966.16

22,188.35

87,188.85

11,777.02
11,777.02

19,764.71
5,657.20

3,291.66
2,454.34
2,086.55
9,831.34
4,524.46

31,568.12
18,913.03
3,202.10
-

58,347.90
3,419.04

9,452.99

55

M3

M4

M5

M6

M7

M8

M9

16,469.51
16,469.51
43,605.65

82,941.17
82,941.17
58,134.29

M10

M11

M12

M13

31,251.53
31,251.53

50,189.46
50,189.46

43,605.65

58,134.29

8,832.94
8,832.94

45,224.00

36,585.25
22,937.11
4,366.02
9,282.12

8,470.01 117,302.80

6,866.66
6,866.66

26,141.07 239,477.92 138,822.27


26,141.07 239,477.92 138,822.27

83,684.92
83,684.92

5,180.91

38,292.19

3,289.10

1,628.35
115,674.44

6,931.81

10,807.40

10,876.14

9,031.77 109,963.66

736.90
1,792.23

1,935.61

8,278.27

8,940.53

260.47
39.32
8,731.98

105,160.41
4,803.25

102,623.21

102,623.21

331.82
331.82

16,273.08
11,663.95
4,609.13
12,585.53

9,460.10

15,264.93 127,822.93

56

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

4,494.93
4,494.93

1,539.11

1,539.11

4,965.17
4,965.17

4,455.76
4,455.76
10,809.17

5,959.34
5,959.34

10,809.16

36,467.05
32,195.55
3,388.61
882.89

5,087.08
5,087.08

91,355.88
91,355.88

63,074.59

49.32
956.51
3,043.73
59,025.04
11.00

11.00

11.00

57

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

122,055.93

44,901.66

37,730.43

31,375.01 103,214.50 114,412.29

3,835.62

19,103.44

58,376.62

18,294.93

289.43

2,277.40

2,459.59

2,459.59

9,340.38

38,013.31 109,047.67

2,277.40
2,277.40

2,459.59
2,459.59

2,459.59
2,459.59

5,025.36

1,655.43
633.04
112.61
909.78

35,923.57

7,684.95
857.52
6,827.43

1,309.47
3,715.89
15,098.79

5,623.42
9,027.48
21,272.67

14,511.64

58

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

587.15
75,132.96
23,872.76
51,260.20
6,332.65
828.62
1,167.71
723.90
238.87
78.21
2,975.83

2,089.74

319.50
7,457.92
203.96
7,253.96
22.54

22.54

22.54
107.93

2,089.74

59

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

107.93

107.93

5.85

5.85

5.85

60

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

968.09

375.80

375.80

375.80

968.09
6.59
961.50
19,118.87

24,788.95

24,788.95

22,034.63

65,201.20

4,852.51

3,835.62

19,103.44

58,376.62

15,824.76

2,282.36

2,217.21

2,217.21

14,985.96
13,721.37
1,264.59

24,788.95

24,788.95

22,034.63

65,201.20

65.47
2,216.89
2,570.15

24,788.95

24,788.95

22,034.63

9,086.06
56,115.14

2,570.15

4,132.91

16,386.14
16,386.14

15,824.76

1,618.41
1,618.41

38,088.19

4,132.91

2,605.50

61

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

13,219.26

38,088.19
20,288.43
3,350.41
16,938.02

2,717.30
2,717.30

61,623.12

10,930.22

1,315.60

6,266.24

1,315.60

6,266.24

1,111.72
200.12
174.88
736.73
57,999.19
1,441.19
21,617.79
150.43
34,789.78
1,196.61
433.41
763.20
4,168.36

4,663.98

4,663.98

34.39

273.76

273.76

62

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

806.17

34.39

8.21

238.87
78.21
480.88

34.39

3,088.43
535.39
2,553.04
7,984.34

150.90

224.37

224.37

1,516.74
841.03

150.90

150.90

63

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

675.71

6,243.23
76.48
6,166.75

84.22

84.22

84.22

25,915.74

6,722.90

10,481.89

2,200.66

289.43

64

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

323.90

295.02
28.88
25,591.85
496.13
7,855.97
11,327.08
5,912.67

592.74

61.89
61.89

2,200.66

289.43

592.74
6,130.15
6,130.15

2,200.66

289.43

10,420.00
2,320.00
8,100.00
85,754.04 173,809.32 310,068.77 305,761.11 155,975.78 106,825.86 188,847.36 146,780.81
- 113,521.52 127,937.61
5,371.32 26,172.69 49,011.24
6,219.93
- 113,521.51 124,879.26
5,371.32
3,767.57
5,371.32
3,767.57
5,371.32
3,767.57
- 113,521.51
65,198.43
- 112,603.89
917.62
8,140.62
1,286.81
20,560.20
35,210.80

59,671.55
31,354.76
8,542.46
8,606.60
11,167.73

45,351.20

65

49,846.77
51,189.36
45,351.20
-

2,399.80
27,638.41

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

13,730.65
1,582.34

9.28
9.28

1,185.20

3,058.34

5,838.16

7,800.61
42.22
18.54
23.69
423.77
423.77
6,245.49
2,198.44
1,847.42
2,199.63

1,089.12

1,185.20

3,058.34
454.49

856.82
856.82
4,981.34

1,089.12

1,185.20

56.66
44.66
119.49
75.32
73.32
712.54
1,144.06
377.80

20.78
1,934.26
752.54
1,470.00
250.00
191.42
362.34

1,468.04

4,251.27

66

M3

M4

M5

M6

M7

380.92
244.90
136.02
1,087.12
1,087.12

570.62
114.28
73.47
40.81
288.60
288.60
167.74
167.74

305.62
38.09
24.49
13.60
183.65
183.65
83.87
83.87

12,260.24
54.43
338.17

M8

M9

M10

M11

M12

M13

1,507.09
1,507.09
306.01
306.01
2,438.16
64.93
2,373.23
2,380.99

2,380.99
50.99
2,330.00
99.34

99.34
25.49
73.85
41,094.46

6,219.93

67

M3

M4

M5

M6

M7

2,065.93

9,801.71
494.72
265.08
3,783.65

5,258.26

2,233.93
2,233.93
1,369.87
864.06

M8

829.81
7,896.16
3,548.07
1,765.55
6,339.12
7,733.17
1,932.96
11,049.61

M9

M10

M11

M12

M13

901.07
688.21

2,431.64

2,199.01

386.41
2,199.01
5,053.08
1,978.92
964.64
2,666.56
67,133.19 120,304.81
668.79

76,371.79

92,295.75

64,010.36

16,587.08

4,987.11

4,961.59

668.79
26,842.19
26,842.19

959.95
4,027.16

103.37
1,425.52
3,432.70

20,834.86

3,322.66
3,322.66

20,834.86

18,787.35

2,692.21

28,069.64
28,069.65
16,250.59
3,281.00

75,406.38
59,744.32
15,662.06
24,778.51
24,778.51
20,119.92
2,692.21

68

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

8,538.06

2,720.06
1,170.73
901.71
647.62
16,067.28

10,227.98
5,839.30

17,427.70
14,517.02
2,910.69

13,385.63
-

2,276.88
2,276.88

19,114.78

15,442.81
15,442.81

5,871.08
5,871.08

19,108.65

19,326.22
19,326.22
18,195.28
4,747.23
13,448.05

1,907.47
2,541.01
667.70
5,727.53
2,541.92
12,485.20
12,485.20
19,108.65

33,208.64
7,543.93
6,495.24
54.68

41,329.08

10,716.00

16,578.51
9,537.21
1,397.13
4,628.17

10,716.00

1,016.00

64,627.57
64,627.57

75,655.04 103,003.21
75,655.04 103,003.21

14,808.29
14,808.29

11,511.09
11,511.09

1,460.78
1,460.78

47,235.08
47,235.08
2,043.81
2,043.81
14,243.61

1,537.50
557.58
39,234.00
10,898.56
10,898.56

15,215.10

3,584.91

12,132.53

12,132.53

12,132.53

12,599.17

1,688.72

69

M3

M4

M5

M6

10,283.12

699.96

M7

M8

M9

M10

M11

M12

M13

3,260.53

5,472.54
4,235.50
670.42
63.90
4,772.74

3,584.91

12,132.53

12,132.53

12,132.53

12,599.17

1,253.37
435.35

24,935.04

29,830.58
29,830.58

24,935.04
539.21
539.21

8,477.08

1,876.33
1,876.33

592.81

1,415.92
93.70
93.70
1,322.22
1,322.22

3,512.52
2,392.60
1,119.91
46,141.58

592.81

2,753.41
2,753.41
3,847.34

3,847.34

3,525.16

1,248.67
573.25
675.42

16,894.43
14,697.00
1,621.33
576.10
1,959.43
1,959.43
26,694.90
26,694.90
19,490.29

2,200.45

1,679.45
1,188.91

70

M3

M4

M5

M6

M7

1,324.71

2,953.34
1,437.08
1,437.08
2,675.93
2,675.93

M8

6,259.92

1,670.65
14,951.28
10,577.54

M9

M10

M11

M12

M13

76,790.35

3,580.51

843.53

8,717.98
8,717.98

3,388.21

4,986.45

1,174.75

14,730.98
5,124.36
8,453.60
1,153.02

942.69
2,445.52

4,076.62
909.83

1,174.75

62,008.67
251.51
61,757.16
1,885.14
1,885.14

28.49

341.77
4.16
4.16
153.72
153.73

2,582.42

28.48

121.70
121.70
60.24

50.99

28,587.61

1,275.24
836.68
211.94
235.87
94.21
94.21
1,186.44
1,186.44
381.30
381.30
76,387.12 116,626.38

70,181.66

67,597.02

4,723.98

4,905.68

5,378.06

291.11

71

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

4,238.76
1,494.90
2,743.86

82,348.25

1,368.27
927.12
50.65
390.50

1,443.93

2,206.98
20.01
2,186.97
2,186.97

22,891.33

20,771.50
368.14
4,843.82
3,489.82
12,069.71

370.95
1,072.98
2,467.64

751.56

2,123.00
344.64
72,655.10
22,942.76
49,712.34
3,428.21
608.15
834.08
361.95
238.87
78.21
1,114.87

751.56

624.66
2.78

192.07
2,353.38
178.46
2,174.92
20.28

72

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

20.28

108.56
37.32
3.63
62.67
4.94
469.33
59.19
91.91
134.61
183.62
43.99
12.07
31.92

1,605.41

85.70

3,012.91
11.65
592.99
196.63
29.49
263.09
58.77
45.01
2,091.71
247.94
457.06
580.00
806.71
164.02
34.99
129.03

20.28
85.70

85.70

1,605.42
51.41
1,554.00

152.54
152.54

961.13

5.85

73

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

5.85

15.63
92.00
50.96
15.25
13.21
12.59
615.56
106.05
196.46
313.05
182.44
115.93
66.51

5.85

5,534.88

215.47

437.48

55.49
25.49
30.00
4,745.10
44.73
1,010.75
169.74
115.12
725.90

3,343.77
684.10
1,382.49
1,277.18

34.91
402.57
3,162.79

345.85

182.77
2,980.02
1,001.14
1,001.14

345.85

215.47

215.47

933.48

74

M3

M4

M5

M6

8,601.76
2,598.87
6,002.89
5,661.63

M7

101.98
831.50
2,457.10

M8

M9

M10

M11

M12

M13

2,373.05

57,458.99

51,417.59

4,723.98

4,905.68

2,171.06

2,457.10

2,373.05

1,681.47

1,816.60

4,723.98

4,905.68

2,171.06

2,373.05

1,681.47

341.26

2,017.41
439.69

1,816.60

4,723.98

4,905.68

2,171.06

48,463.48
4.44
39,632.62
8,826.42

1,555.80
308.93
145.81
1,101.06
54,035.15
2,157.34

1,137.51
374.31
763.20

51,877.81
186.57
186.57

14.82

1,617.08

1,024.15
31.17
992.98
111.12
165.42
716.44

16,532.34

1,228.46
222.85
165.77
10,268.81
1,832.92
2,282.46
735.22
5,418.22
1,609.00

14.82

75

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

387.74
146.07
107.73
24.96
12.84
238.87
78.21
612.59

14.82

72.29

484.79

1,141.72
36.79
283.21
128.10
155.11

3,037.44
484.40
2,553.04
12,302.42

290.70
290.70

531.01
425.67
105.34

72.29

329.14
155.65
1,908.24
470.36
1,370.25
67.63
137.10
120.73
16.37
3,605.58
351.91
167.60

72.29

235.56
163.01
853.29
471.35
1,000.90

76

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

361.95
6,166.73
101.98
6,064.75
4,390.15

21.06

25.85

23.07
2.78
381.71

21.06

65.65
316.06
88.90
88.90

21.06

3,893.68
280.44
3,613.24

1,866.04

31,577.79

12,722.67

16,179.43

3,098.83

291.11

635.90
583.52
52.38

1,866.04
551.54
374.18
940.31
8,807.45

528.81
1.22
527.59
18.13
509.46
455.79
229.07
226.72
226.72

814.24

441.88

409.93
2.47
11.95
5.70
6.25

395.51
190.88
204.63

77

M3

M4

M5

M6

52.38

M7

M8

M9

M10

M11

M12

M13

577.90
236.34

7,993.21
7,993.21

6,672.95

402.50
39.38
31,135.91
2,826.31
10,683.74
15,423.85
2,202.01

3,098.83

291.11

2,383.60
2,383.60

6,672.96
6,049.72
6,049.72

3,098.83

291.11

199,099.16 202,290.63

65,832.38

50,425.02

13,795.83
3,135.83
10,660.00
25,975.63
25,975.63
25,975.63

67,015.88
67,015.87
67,015.87

19,186.22
19,186.22
11,437.65

6,186.64
6,186.64
6,186.64

1,189.76
1,189.76
1,189.76

482.33
859.93

6,186.64

34,147.60

18,500.83
13,989.73
4,511.10

92.07
210.21
74.53
1,867.34
3,152.19

32,867.10
620.30
16,997.07
937.38
5,183.57
9,128.79

6,186.64

7,466.70
6,124.43

2,244.15

1,189.76
1,189.76

15,990.81
13,208.15
4,948.64

1.18
1.18

8.10
8.10

1,281.58
1,870.61
6,041.31

78

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13
-

6,041.31
7,748.57

402.18
402.18
7,346.39
213.33

133.98
39.83
712.54
2,860.15
797.16
376.27
1,176.00
750.00
287.13

79

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

18,510.94 176,465.81
18,510.94 176,465.81

4,928.77
4,928.77

46,329.29
46,329.29

80

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

1,671.07

89,409.33

928.57

1,671.07

89,409.34

928.57

13,509.41

6,105.05
3,672.08
2,432.97
76,022.63

1,077.34

260.89
260.89

1,077.34

1,077.34

4,466.31
4,466.31
8,782.21

29,156.62
26,708.43
1,156.21
1,291.99
3,560.95
3,560.95
43,305.06
43,305.06
4,928.77

4,928.77

44,323.39

8,782.21
-

3,330.46

81

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

2,284.69

2,467.47

2,467.47

1,045.77

2,461.30

2,461.30

1,635.52
3,093.19
1,631.43
37,963.24

82

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

180,588.22

25,824.83

60,903.61

4,095.73

98,605.19

1,779.65

456.34
1,323.31
12,300.86

11,834.97
465.89
78,590.48
23,496.76
55,093.72
4,246.54
714.37
1,000.90
542.93
238.87
78.21
1,415.48

255.79
1,687.65
229.45
1,458.20

83

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

22.15

22.15

22.15
86.09

86.09

86.09

84

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

5.85

5.85

5.85

246.19

246.19

85

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

246.19

44,997.43

12,723.09

47,414.83

486.04

2,509.10

201.85

72.57
2,436.53
42,488.33

201.85

9,133.19
33,355.14

25,833.03

486.04

11,157.67
11,157.67

486.04

1,363.57
1,363.57

1,092.89
24,740.14
21,581.80
4,729.63
16,852.17

6,285.27

5,318.53

5,318.53

966.74

86

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

966.74

36.57

36.57

36.57

98.96

87

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

98.96

98.96

84.22

88

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

84.22

84.22

30,340.04

13,101.74

13,488.78

3,389.94

441.88

402.50
39.38
29,898.17

4,361.37

9,960.72
15,423.85
4,513.60

3,389.94

4,361.37
8,433.32
8,433.32

3,389.94

307.05
307.05

13,488.78
2,828.78

89

M3

M4

M5

M6

M7

M8

M9

M10

M11

M12

M13

10,660.00

440.00

440.00

440.00

5.91

4.84

11.98

9.86

13.15

13.97

6.47

5.09

6.09

4.59

0.84

22.24

27.09

39.06

48.93

62.08

76.05

82.52

87.61

93.70

98.29

99.13

90

M14

M15

TOTAL

40,038.09

22,780.32

7198492.93

4420502.26

1626157.34

58376.63

727.74

3.98

5.16

720.60

18204.00

5099.65

13105.36

19034.00

16159.54

2875.46

4128.98

628.54

1936.02

1566.42

16285.90

14824.68

1462.23

181934.13

87.80

38.08

50.73

261.02

222.33

21.12

19.57

1041.87

211.09

213.86

91

M14

M15

TOTAL

266.07

353.85

3971.33

504.00

301.57

203.44

824.47

152.89

174.36

499.21

1566.08

792.18

356.07

419.83

1079.78

508.71

274.36

298.71

1776.12

1776.12

1057.79

1057.79

513.63

111.30

157.66

246.67

5601.01

89.62

66.88

8.91

15.82

571.49

571.49

4941.90

4941.90

92

M14

M15

TOTAL

235.67

235.67

1905.75

478.74

1428.01

145.11

145.11

165348.03

23283.70

142065.33

48170.67

508.00

508.00

14153.89

3835.70

3732.76

1929.99

1141.63

1954.41

1564.39

28747.39

28384.28

364.11

4764.39

13.70

4751.69

66634.67

446.78

191.40

256.38

2738.25

176.26

661.58

1366.22

93.97

93

M14

M15

TOTAL

11.09

434.13

1750.89

1750.89

4346.69

2418.97

1928.71

5081.29

2533.56

2548.74

12916.03

5409.55

2793.26

4715.21

340.71

90.34

74.34

178.03

3779.28

1735.24

627.10

1418.93

12530.41

1365.88

1584.33

9582.19

88.13

32.53

20.90

36.70

9132.93

3820.46

5313.48

3262.74

1122.06

94

M14

M15

TOTAL

955.30

68.39

100.37

2141.68

1647.44

495.24

8796.19

223.96

202.98

9.40

13.59

506.45

506.45

8067.77

8067.77

857.27

857.27

581.09

96.68

84.02

120.29

21.34

235.98

27.79

5978.40

11.10

5.32

6.79

76.61

28.57

36.21

10.16

4.67

120.30

120.30

95

M14

M15

TOTAL

2415.35

1078.62

765.64

573.10

299.41

299.41

3060.63

28.83

3032.80

4935.16

21.65

11.04

11.61

107.87

81.30

10.01

18.57

251.78

149.60

36.31

67.87

2664.93

1101.13

731.07

834.73

731.39

612.61

119.78

91.55

91.55

16.04

12.37

4.67

1056.94

260.71

96

M14

M15

TOTAL

797.23

936064.49

24868.00

24868.00

534015.21

228536.49

41874.16

35173.90

55945.49

95809.91

76680.28

350356.97

63746.80

55333.10

85594.44

56762.07

44978.78

26137.32

17810.45

26827.31

10.28

26818.03

108072.70

212.12

93.69

119.43

2119.61

2119.61

31228.41

10993.20

9238.05

10999.16

4285.12

4285.12

70231.45

97

M14

M15

TOTAL

2273.47

11372.59

227.64

447.60

558.62

339.94

514.24

4276.24

5149.27

6776.86

3383.38

5348.66

2258.62

3529.00

5251.00

1915.20

1410.10

15216.01

4729.42

273.09

175.93

98.16

1854.01

1854.01

219.58

219.58

2385.74

47.38

2339.36

4636.25

259.48

167.18

93.30

656.90

656.90

98

M14

M15

TOTAL

378.42

378.42

3344.44

77.48

3267.96

3752.92

267.65

172.43

96.22

1286.56

1286.56

588.10

588.10

1613.60

179.46

1435.14

202882.92

194.85

1205.46

10314.60

31333.60

15089.11

6289.26

22578.70

36204.44

7648.82

72033.08

1547.00

829.19

11824.90

8080.44

32223.95

6185.10

3015.50

8334.00

99

M14

M15

TOTAL

1380510.42

9072.02

4281.84

4791.17

114972.53

83882.85

3000.83

12908.91

4455.74

10728.20

311139.92

197086.79

114054.13

77433.85

77433.85

209300.49

96128.79

50781.29

18667.10

26682.41

8500.89

3659.52

2818.61

2024.76

104672.81

45366.67

41059.35

18248.79

152723.34

30691.05

26259.47

8112.54

2087.55

77633.23

7944.51

100

M14

M15

TOTAL

99411.69

99411.69

183181.93

81441.99

101740.94

8833.94

8833.94

214449.72

29804.78

4367.02

14464.04

38293.19

4918.45

122607.25

739652.29

739652.29

9439.20

9439.20

190357.76

35474.02

1385.39

6400.22

40.32

37098.15

105161.41

4804.25

248048.28

145425.07

102624.21

332.82

332.82

16274.08

11664.95

4610.13

169264.29

101

M14

M15

TOTAL

321.65

321.65

9844.20

8305.09

1540.11

9421.93

9421.93

53236.55

38155.89

14198.77

883.89

5088.08

5088.08

91356.88

91356.88

98362.64

2211.41

17566.00

4585.38

14977.82

59026.04

5950.48

118.45

118.45

1567.76

451.02

691.92

172.28

85.17

171.37

4112.19

4112.19

155.07

155.07

1249.45

102

M14

M15

TOTAL

3.08

3.08

61.74

52.24

10.49

61.85

61.85

501.16

279.89

88.64

134.62

32.40

32.40

594.22

594.22

382.30

382.30

674185.21

5735.69

1170.96

2023.23

2543.50

166630.26

45.49

16865.19

10817.44

113.61

910.78

1310.47

3716.89

58708.32

858.52

12451.85

9028.48

35785.30

103

M14

M15

TOTAL

588.15

75133.96

23873.76

51261.20

8423.39

829.62

1168.71

724.90

239.87

79.21

2976.83

2090.74

320.50

7458.92

204.96

7254.96

734.84

4.22

127.46

44.49

5.25

74.00

6.71

536.71

69.80

103.16

155.04

211.71

69.46

14.99

32.92

23.54

5560.59

16.37

808.11

104

M14

M15

TOTAL

260.42

39.91

372.90

78.50

60.37

2697.09

351.49

572.94

733.16

1042.50

284.06

47.10

130.03

108.93

1758.96

204.96

1555.00

967.98

16.63

93.00

51.96

16.25

14.21

13.59

616.56

107.05

197.46

314.05

189.29

116.93

67.51

6.85

56.49

26.49

31.00

105

M14

M15

TOTAL

20763.85

94.60

3561.76

449.19

232.28

1649.07

59.77

1175.45

13089.17

1554.31

2427.33

3625.09

5485.44

2957.85

1863.74

719.30

376.80

1064.48

102.98

962.50

269839.36

359.62

7276.00

1807.18

970.24

66.47

4435.10

163149.60

22501.12

81964.18

58686.29

76051.42

18005.56

4133.91

2606.50

106

M14

M15

TOTAL

51308.45

23006.73

6068.71

16939.02

78535.91

1289.43

12275.98

2364.93

3470.30

176.52

6267.24

1112.72

201.12

175.88

737.73

62664.17

1442.19

21618.79

4815.41

34790.78

1197.61

434.41

764.20

23476.51

115.00

4003.21

207.08

355.16

2823.31

216.55

405.11

14673.34

2660.81

1613.25

2322.12

107

M14

M15

TOTAL

8080.16

1599.53

475.58

147.07

108.73

25.96

13.84

239.87

79.21

481.88

35.39

3089.43

536.39

2554.04

30202.83

159.10

3063.45

513.55

572.31

1393.89

586.71

6812.85

1863.87

4323.53

627.44

1679.67

1432.88

247.78

12248.54

842.03

360.15

151.90

1086.97

770.41

4031.29

108

M14

M15

TOTAL

1924.15

2002.80

1086.86

6244.23

77.48

6167.75

15117.59

10.88

152.14

23.75

26.02

93.10

12.27

3112.90

764.53

1082.11

1268.26

440.84

356.62

85.22

11404.83

612.87

10792.96

830.76

2.71

829.05

26.38

803.67

1691.28

168.76

1523.51

567.20

273.22

685.09

54110.75

109

M14

M15

TOTAL

428.80

960.12

462.97

174.26

296.02

29.88

33621.70

7933.24

7856.97

11328.08

6506.41

8683.13

6193.04

2491.09

10421.00

2321.00

8101.00

38,667.01
39,724.12
39,724.12

2,533.33

1567332.99

419148.79

332615.97

9139.89

9139.89

28,180.45

206901.39

112604.89

9059.24

1287.81

20561.20

35211.80

28,180.45
4,962.82

28181.45

109986.58

31355.76

8543.46

8607.60

13568.53

27639.41

110

M14

M15

TOTAL

13731.65

4,962.82
6,580.85

6546.16

6591.13

10.28

6,580.85

6581.85

17883.31

43.22

19.54

24.69

424.77

424.77

6246.49

2199.44

1848.42

2200.63

857.82

857.82

10315.00

455.49

2275.32

57.66

45.66

120.49

76.32

74.32

713.54

1145.06

399.58

1935.26

753.54

1471.00

251.00

192.42

363.34

5720.31

111

M14

M15

TOTAL

381.92

245.90

137.02

2595.22

2595.22

307.01

307.01

2439.16

65.93

2374.23

2952.61

115.28

74.47

41.81

289.60

289.60

168.74

168.74

2381.99

51.99

2331.00

405.96

39.09

25.49

14.60

184.65

184.65

84.87

84.87

100.34

26.49

74.85

59575.64

55.43

339.17

112

M14

M15

TOTAL

2896.74

8798.23

4237.28

1766.55

6340.12

10165.81

1933.96

23051.34

495.72

266.08

3784.65

2586.42

10312.34

1979.92

965.64

2667.56

210.18

2,616.36

441764.46

2903.73

1370.87

1533.86

36791.89

26843.19

960.95

4131.53

1426.52

3433.70

99564.90

63067.98

36497.92

24779.51

24779.51

66977.91

30762.86

16251.59

5974.21

113

M14

M15

TOTAL

8539.06

2721.06

1171.73

902.71

648.62

33495.99

14518.02

13139.67

5840.30

48872.15

9821.82

8403.71

2596.69

668.70

24843.31

2542.92

31812.42

31812.42

58618.82

26062.12

32557.70

210.18
210.18

2,616.36
2,616.36

2827.54

68624.59

9538.21

1398.13

4629.17

12254.50

1574.58

39235.00

329200.62

329200.62

2044.81

2044.81

83730.09

114

2827.54

M14

M15

TOTAL

15756.65

4236.50

1371.37

64.90

8034.26

53836.04

436.35

54766.62

29831.58

24936.04

540.21

540.21

3513.52

2393.60

1120.91

56035.58

94.70

94.70

3792.36

3199.55

593.81

2754.41

2754.41

20742.78

14698.00

5469.67

577.10

1960.43

1960.43

26695.90

26695.90

24265.12

574.25

4556.32

1189.91

115

M14

M15

TOTAL

2996.36

14952.28

101006.18

1438.08

1438.08

35675.30

16519.27

8454.60

2096.71

6523.14

2085.58

62009.67

252.51

61758.16

1886.14

1886.14

2925.19

5.16

5.16

183.21

154.73

29.48

122.70

122.70

1336.48

837.68

263.93

236.87

95.21

95.21

1187.44

1187.44

382.30

382.30

377222.12

116

M14

M15

TOTAL

6782.26

1495.90

2744.86

2543.50

107447.56

21.01

5000.16

3115.09

51.65

391.50

371.95

1073.98

23240.14

369.14

4844.82

3490.82

14193.71

345.64

72656.10

22943.76

49713.34

4180.77

609.15

835.08

362.95

239.87

79.21

1115.87

752.56

193.07

2354.38

179.46

2175.92

645.94

3.78

117

M14

M15

TOTAL

109.56

38.32

4.63

63.67

5.94

470.33

60.19

92.91

135.61

184.62

65.27

13.07

32.92

21.28

4705.02

12.65

593.99

197.63

30.49

264.09

59.77

46.01

2092.71

248.94

458.06

581.00

807.71

250.72

35.99

130.03

86.70

1758.96

204.96

1555.00

967.98

118

M14

M15

TOTAL

16.63

93.00

51.96

16.25

14.21

13.59

616.56

107.05

197.46

314.05

189.29

116.93

67.51

6.85

56.49

26.49

31.00

10496.45

45.73

1449.23

170.74

116.12

726.90

35.91

403.57

6507.55

685.10

1383.49

1460.95

2981.02

1563.46

1002.14

346.85

216.47

934.48

119

M14

M15

TOTAL

102.98

832.50

134110.21

2599.87

26132.83

5662.63

6072.93

781.95

13618.32

1556.80

309.93

146.81

1102.06

102499.63

2162.78

39633.62

8827.42

51878.81

1325.08

561.88

764.20

17572.30

32.17

2611.06

112.12

166.42

1945.90

223.85

166.77

10269.81

1833.92

2283.46

736.22

5419.22

1624.82

120

M14

M15

TOTAL

388.74

147.07

108.73

25.96

13.84

239.87

79.21

613.59

15.82

3038.44

485.40

2554.04

13517.43

37.79

769.01

129.10

156.11

330.14

156.65

2199.93

762.06

1371.25

68.63

669.11

547.40

122.71

3678.87

352.91

168.60

73.29

236.56

164.01

854.29

472.35

1001.90

121

M14

M15

TOTAL

362.95

6167.73

102.98

6065.75

4822.14

3.47

38.81

6.70

7.25

24.07

3.78

778.22

191.88

271.28

317.06

110.96

89.90

22.06

3894.68

281.44

3614.24

529.81

2.22

528.59

19.13

510.46

2322.84

230.07

2093.76

779.26

375.18

941.31

73314.17

584.52

1309.50

122

M14

M15

TOTAL

631.28

237.34

403.50

40.38

45803.07

10820.51

10684.74

15424.85

8875.97

11824.26

8434.32

3390.94

13796.83

3136.83

10661.00

1097331.09

183992.19

114418.44

2612.90

2612.90

49955.35

7935.49

16998.07

1030.45

5877.11

10064.25

8054.98

55801.62

13990.73

20502.91

13209.15

6231.22

1871.61

6051.59

10.28

123

M14

M15

TOTAL

6042.31

11966.51

20.82

9.70

12.12

199.98

199.98

2931.60

1031.95

868.17

1033.48

403.18

403.18

8414.93

214.33

1068.54

134.98

40.83

713.54

2861.15

798.16

377.27

1177.00

751.00

288.13

1400.44

55.42

35.99

20.43

371.60

371.60

525.59

525.59

450.84

10.28

124

M14

M15

TOTAL

441.56

4947.55

164.25

105.96

59.30

79.71

79.71

42.94

42.94

4663.65

26.49

4638.16

772.67

39.09

25.49

14.60

184.65

184.65

84.87

84.87

467.05

26.49

441.56

50491.57

73.82

453.44

3161.19

11770.81

5668.71

2363.13

8482.11

13600.50

4925.86

418876.12

418876.12

125

M14

M15

TOTAL

3578.96

3578.96

141026.42

25997.30

8110.47

2397.12

123.33

14064.29

89410.34

929.57

99954.41

45783.85

54171.55

1033.34

1033.34

6106.05

3673.08

2433.97

96314.25

153.00

153.00

6891.10

5813.76

1078.34

4467.31

4467.31

37939.83

26709.43

9939.42

1292.99

3561.95

3561.95

43306.06

43306.06

62000.21

126

M14

M15

TOTAL

1492.42

11852.55

3094.19

7600.81

37964.24

7299.41

118.45

118.45

2916.69

1351.05

691.92

172.28

534.06

171.37

4112.19

4112.19

155.07

155.07

1342.31

3.08

3.08

73.87

62.44

12.42

61.85

61.85

575.64

336.94

106.08

134.62

38.65

38.65

594.22

594.22

229.78

127

M14

M15

TOTAL

229.78

494464.78

4877.75

860.06

1476.18

2543.50

121466.12

26.82

6308.10

3839.82

66.36

624.28

457.34

1324.31

29605.56

588.52

5892.56

5111.59

17550.00

466.89

78591.48

23497.76

55094.72

5250.51

715.37

1001.90

543.93

239.87

79.21

1416.48

1003.97

256.79

1688.65

230.45

1459.20

128

M14

M15

TOTAL

717.88

4.14

124.09

43.46

5.13

71.94

6.56

523.85

67.98

101.39

151.79

205.69

68.79

14.72

32.92

23.15

4717.35

12.71

597.17

198.65

30.65

265.46

60.16

46.24

2101.26

250.24

459.83

583.48

810.72

251.25

36.12

130.03

87.09

1758.96

204.96

129

M14

M15

TOTAL

1555.00

967.98

16.63

93.00

51.96

16.25

14.21

13.59

616.56

107.05

197.46

314.05

189.29

116.93

67.51

6.85

56.49

26.49

31.00

10966.32

42.91

1545.32

212.51

110.98

680.75

40.44

504.63

6721.60

641.74

1691.73

1247.57

3143.56

1726.01

1094.06

386.76

130

M14

M15

TOTAL

247.19

934.48

102.98

832.50

154615.46

210.78

4388.34

1082.34

596.05

73.57

2639.38

87099.46

14578.78

39166.54

33356.14

39974.51

11158.67

2497.77

1579.93

24741.14

22946.37

6094.20

16853.17

58510.86

1061.36

11047.44

2277.03

2820.63

633.25

5319.53

1820.57

254.84

167.78

1399.96

43464.36

131

M14

M15

TOTAL

2700.10

13886.85

3093.47

23786.95

1121.12

357.92

764.20

27999.27

49.29

2062.46

106.03

153.80

1436.95

212.41

157.27

10007.49

1354.40

1723.54

1082.88

5849.66

1877.35

354.16

147.07

108.73

25.96

13.84

239.87

79.21

878.93

37.57

14006.70

740.34

13267.35

17944.83

69.08

132

M14

M15

TOTAL

1540.92

267.62

308.33

601.70

366.27

2606.74

898.15

1355.25

355.34

1580.03

1333.25

247.78

5934.32

426.59

240.43

99.96

459.00

317.51

1658.49

860.87

1335.53

543.93

6218.74

51.99

6167.75

15224.67

10.88

152.14

23.75

26.02

93.10

12.27

3112.90

764.53

1082.11

133

M14

M15

TOTAL

1268.26

440.84

356.62

85.22

11511.91

612.87

10900.04

830.76

2.71

829.05

26.38

803.67

2324.36

231.60

2093.76

779.26

375.18

941.31

73314.17

584.52

1309.50

631.28

237.34

403.50

40.38

45803.07

10820.51

10684.74

15424.85

8875.97

11824.26

8434.32

3390.94

13796.83

3136.83

134

M14

M15

TOTAL

10661.00

389.50

20,326.52
12,746.02

36377.02

2201.00

8401.00

2201.00

8,474.00

8475.00

2421.00

4273.02

389.50

4,272.02
7,580.50
5,760.00
90.50

441.00

1241.00

1,240.00
490.00

76953.57

62073.01

2543.50

1439.05

10901.00

0.56

0.32

100.00

99.68

100.00

389.50
-

135

27967.02

8411.00
5761.00
481.00

491.00

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

409,503.52S
140,138.90S
39,434.84 S
39,434.84 S
726.74
2.98
4.16
719.60
18,203.01
5,098.65
13,104.36
19,033.00
16,158.54
2,874.46
1,472.09 S
627.54
844.55
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

774,507.74S 428,615.26S 351,024.57S 868,406.86S 715,113.45


489,028.53S 229,516.10S 148,733.94S 714,009.90S 485,182.62
217,613.13S 23,775.24 S 73,917.13 S 88,457.79 S 90,972.15
18,940.79

2,655.88
1,090.46
1,565.42
16,284.91
14,823.68
1,461.23
177,712.64S 4,220.49
86.81
37.08
49.73
260.02
221.33
20.12
18.57
1,040.87
210.09
212.86
265.07
352.85
3,970.33
503.01
300.57
202.44
823.46
151.89
173.36
498.21
1,565.08
791.18
355.07
418.83
1,078.78

S
S
S
S
S

507.71
273.36
297.71
1,407.58
1,407.58

S
S
S
S
S
S
S
S
S

5,600.00
88.61
65.88
7.91
14.82
570.49
570.49
4,940.90
4,940.90

S
S
S
S
S
S
S
S
S
S

S
S
S
S
S
S
S
S

367.54
367.54
1,056.79
1,056.79
512.63
110.30
156.66
245.67

S
S
S
S
S
S
S

234.67
234.67
1,904.75
477.74
1,427.01
144.11
144.11

165,347.03
23,282.70
142,064.33
5,177.46 S
507.00
507.00
4,670.46 S
1,375.54 S
1,365.93 S
1,928.99
S
S

S 2,733.81

6,130.37

S 36,861.85

6,130.37
2,276.86
2,260.95

S 3,352.07
S 182.31
S 104.88

801.71
790.85

S
S
S
S
S
S
S
S
S
S

S 6.00

338.92
1,162.57
1,563.39
28,746.39
28,383.28
363.11
4,763.39
12.70
4,750.69
5,412.66 S 29,602.24 S 16,177.16

S
S
S
S
S
S
S
S

445.78
190.40
255.38
2,288.03
175.26
660.58
1,365.22
86.97

S 6.00

S 443.22

S 6.00
S 10.09
S 433.13
S
S
S
S
S

1,749.89
1,749.89
3,609.76
1,682.05
1,927.71

S 53.01
S 53.01

S 735.92
S 735.92
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

5,080.30
2,532.56
2,547.74
12,915.02
5,408.55
2,792.26
4,714.21
286.70
89.34
20.33
177.03
3,778.27
1,734.24
626.10
1,417.93
5,722.37 S
S
1,583.33
4,139.04 S
87.13
31.53
19.90
35.70
S
S
S
S
S
S

6,807.04
1,364.88
5,442.16

9,131.94
3,819.46
5,312.48
238.18
238.18
238.18

S
S
S
S
S
S

S
S
S
S
S
S
S

4,934.16
20.65
10.04
10.61
106.88
80.30
9.01

553.31
95.68
83.02
119.29
20.34
234.98

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

17.57
250.78
148.60
35.31
66.87
2,663.93
1,100.13
730.07
833.73
730.39
611.61
118.78
90.55
90.55
15.04
11.37
3.67
1,055.94
259.71
796.23
8,114.27
8,114.27
8,114.27

S 13,418.38 S 3,334.35
S 13,418.38 S 3,334.35
S 13,418.38 S 3,334.35

S 19,758.80

S 19,758.80
S 19,758.80

S
S
S
S
S
S

1,851.94
211.12
92.69
118.43
1,640.82
1,640.82

S 19,439.67 S 23,637.11

S 477.79
S 477.79

S 15,827.82 S 15,399.58
S 10,992.20
S 4,829.66 S 4,407.38
S 10,998.16

S
S
S
S
S
S

1,714.77
272.09
174.93
97.16
1,442.68
1,442.68

S
S
S
S
S
S
S
S
S
S

1,368.28
258.48
166.18
92.30
655.90
655.90
377.42
377.42
76.48
76.48

S 3,134.06

S 8,237.53

S 3,134.06

S 8,237.53

S 3,013.65

S
S
S
S
S
S
S
S

410.33
410.33
218.58
218.58
2,384.74
46.38
2,338.36
3,266.96

S 3,266.96
S 3,266.96

S
S
S
S
S
S

1,225.94
266.65
171.43
95.22
959.29
959.29

S 2,525.97

S
S
S
S

S
S
S
S
S
S
S
22,147.34 S
193.85
1,204.46
1,158.09 S

S
S
S
S

S
S
S
19,590.94 S 25,821.72 S
1,546.00
828.19
11,823.90

S 5,392.85

S 3,774.08
S 3,774.08
S 3,774.08

326.27
326.27
587.10
587.10
1,612.60
178.46
1,434.14
30,609.30 S 31,399.08

4,787.58

S 4,255.63

4,933.25
3,481.24
7,173.90
11,555.06

S 25,821.72 S
S
S
S
S 348,343.76S
S 5,296.93
S 506.76
S 4,790.17
S 83,881.85
S 83,881.85

1,008.37
6,184.10
3,014.50
1,348.09
224,013.19

S
S
S
S
S
S

96,810.60
96,810.60

167,614.37S
53,561.24 S
114,053.13
46,927.09 S
46,927.09 S
44,623.52 S
S

30,505.76
30,505.76
96,696.83
28,148.65

S 11,357.39
S 16,791.26
S
S
S
S
S

8,499.89
3,658.52
2,817.61
2,023.76
36,123.63 S
S
S 20,842.00 S
S 15,281.63 S

S
S
S
S
S
S

90,862.33
90,862.33
4,666.74
4,666.74
9,842.06
7,160.93

S 475.29

S
S
S
S
S
S
S
S

160,662.77S
160,662.77S
4,771.46
4,771.46
39,835.73 S
28,312.10
647.49
S
1,935.61 S

S 2,205.84

S 8,940.53

68,548.18
45,365.67
20,216.35
2,966.16

83,684.92 S 26,141.07 S 239,477.92S 138,822.27


83,684.92 S 26,141.07 S 239,477.92S 138,822.27

10,807.40 S 10,876.14 S 9,031.77


736.90
1,792.23

S 1,935.61

S 8,278.27

S 8,940.53

S 109,963.66

S 260.47
S 39.32
S 8,731.98
S 105,160.41
S 4,803.25

S 76,353.53 S 69,070.53
S 76,353.53 S 69,070.53

S 102,623.21
S 102,623.21

S 331.82
S 331.82

S
S
S
S
S

4,129.80
320.65
320.65
3,809.15
3,809.15

S 9,460.10

S
S
S
S 15,264.93 S 127,822.94S

S 4,494.93
S 4,494.93

16,273.08
11,663.95
4,609.13
12,585.53

S 1,539.11
S 1,539.11

S 4,965.17
S 4,965.17

S 4,455.76
S 4,455.76
S 10,809.17 S
S
S 10,809.17 S
S

36,467.06 S 5,959.34
32,195.56 S 5,959.34
3,388.61
882.89
S 5,087.08
S 5,087.08
S 91,355.88
S 91,355.88

S
S
S
S
S

35,287.05
2,210.41
17,515.68
3,627.87
11,933.09

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

5,938.47
117.45
117.45
1,555.76
450.02
690.92
171.28
84.17
159.37
4,111.19
4,111.19
154.07
154.07
1,248.43
2.08
2.08
60.73
51.24
9.49
60.85

S 63,074.60
S
S
S
S
S

49.32
956.51
3,043.73
59,025.04
11.00

S 11.00

S 11.00

S
S
S
S
S
S
S
S
S

9,841.73
5,734.69
1,169.96
2,022.23
2,542.50
571.73
44.49
527.24
527.24

S
S
S
S
S
S
S
S
S
S
S
S

60.85
500.15
278.89
87.64
133.62
31.40
31.40
593.22
593.22
381.30
381.30
110,752.63S 122,055.94S 44,901.66 S 37,730.43 S 31,375.01

S 2,459.59

S 2,277.40

S 2,459.59

S 2,459.59

S 9,340.38

S 2,459.59
S 2,459.59

S 2,277.40
S 2,277.40

S 2,459.59
S 2,459.59

S 2,459.59
S 2,459.59

S
S
S
S

1,655.43
633.04
112.61
909.78

S 7,684.95
S 857.52
S 6,827.43

S 460.88
S 3.22

S 250.43

S
S
S
S
S
S
S
S

120.74
43.49
4.25
73.00
306.68
68.80
102.16
135.72

S 30.24
S 30.24
S
S
S
S
S

S
S
S
S
S

308.76
15.37
293.39
259.42
33.97

421.06
15.63
66.21
50.96
15.25

S 278.79
S 106.05
S 172.74
S 60.43

S 5.71

S 5.71
S 229.04

S
S
S
S
S

18.33
210.71
15.68
13.99
1.69

S 5,142.90
S 513.72
S
S
S
S
S
S
S
S
S
S
S
S

4.95
371.90
77.50
59.37
2,696.09
350.49
571.94
732.16
1,041.50
175.13
46.10
129.03

S
S
S
S

1,757.96
203.96
1,554.00
540.07

S 25.80

S 13.21
S 12.59
S 336.77
S
S
S
S

23.72
313.05
122.01
115.93

S 60.43

S
S
S
S
S

609.09
93.60
515.49
448.19
67.30

S 6.08
S
S
S
S

55.49
25.49
30.00
18,809.87 S 968.09

S 3,045.27
S
S
S
S
S
S
S
S
S
S
S
S

163.98
1,648.07
58.77
1,174.45
13,088.17
1,553.31
2,426.33
3,624.09
5,484.44
2,581.04
1,862.74
718.30

S 95.39
S 95.39
S
S
S
S

1,146.94
358.62
788.32
788.32

S
S
S
S 10,765.85 S

968.09
6.59
961.50
19,118.87 S 24,788.95 S 24,788.95 S 22,034.63

S 1,987.10
S 1,017.86
S 969.24

S 8,778.75
S 8,778.75

S 14,985.96 S 24,788.95 S 24,788.95 S 22,034.63


S 13,721.37
S 1,264.59 S 24,788.95 S 24,788.95 S 22,034.63
S 4,132.91
S 4,132.91

S 588.58
S 588.58

S 5,393.00
S 699.85
S 4,693.15

S 61,623.13 S 10,930.22
S 1,315.60

S 6,266.24

S 2,363.93
S 2,153.70
S 175.52

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

S
S
S
S
S

S 1,315.60

S
S
S
S
S
S
S
S
S
S
S
S
19,272.77 S
114.00
3,728.45 S
206.08
354.16
2,822.31
215.55
130.35
S
14,672.34
2,659.81
1,612.25
2,321.12
8,079.16
757.98
S
474.58
137.87
S
107.73
24.96
12.84
S
S
S
S
S
S
22,066.61 S
158.10
2,838.09 S
512.55
571.31

S 6,266.24
1,111.73
200.12
174.88
736.73
57,999.19 S 4,663.98
1,441.19
21,617.79
150.43
S 4,663.98
34,789.78
1,196.61
433.41
763.20
4,168.36
273.76

273.76

806.17
8.21

238.87
78.21
480.88
3,088.43
535.39
2,553.04
7,984.34
224.37

S
S
S
S
S
S
S
S
S
S

1,392.89
361.34
S 224.37
6,811.84
1,862.87
4,322.53
626.44
1,678.66
1,431.88
246.78
10,579.92 S 1,516.74
S 841.03
S 359.15
S
S
S
S
S
S

1,085.97
769.41
4,030.29
1,247.44
2,001.80
1,085.86

S 675.71

S 6,243.23
S 76.48
S 6,166.75
S
S
S
S
S
S
S
S
S
S
S
S
S

15,032.37
9.88
151.14
22.75
25.02
92.10
11.27
3,111.90
763.53
1,081.11
1,267.26
355.62
355.62

S
S
S
S
S
S
S
S
S
S
S

11,403.83
611.87
10,791.96
829.76
1.71
828.05
25.38
802.67
1,690.27
167.76
1,522.51

S
S
S
S
S
S
S
S

566.20
272.22
684.09
8,499.14
427.80
635.23
461.97
173.26

S 7,436.11
S 7,436.11

S 2,542.50

S 25,915.75 S 6,722.90

S 10,481.89

S 323.90

S
S
S
S
S
S
S

295.02
28.88
25,591.85 S 592.74
496.13
7,855.97
11,327.08
5,912.67 S 592.74
S 6,130.16
S 6,130.16

S 61.89
S 61.89
S
S
S
S
S
S
S
S

10,420.00
2,320.00
8,100.00
88,564.58
5,371.32
5,371.32
5,371.32
5,371.32

S
S
S
S
S

179,505.81
26,172.69
3,767.57
3,767.57
3,767.57

S 7,800.61
S 42.23
S 18.54

S
S
S
S
S
S
S

23.69
423.77
423.77
6,245.49
2,198.44
1,847.42
2,199.63

S 1,089.12
S 1,089.12

S
S
S
S
S
S

1,468.04
380.92
244.90
136.02
1,087.12
1,087.12

S
S
S
S
S
S
S
S

570.62
114.28
73.47
40.81
288.60
288.60
167.74
167.74

S
S
S
S
S
S
S
S

305.61
38.09
24.49
13.60
183.65
183.65
83.87
83.87

S
S
S
S

12,260.24
54.43
338.17
2,065.93

S
S
S
S

9,801.71
494.72
265.08
3,783.65

S 5,258.26

S
S
S
S

2,233.93
2,233.93
1,369.87
864.06

S
S
S
S
S
S

54,605.65
54,605.65
2,043.81
2,043.81
14,243.61
10,283.12

S 699.96
S 3,260.53

S 74,712.06
S 74,712.06

S
S
S
S
S
S

15,215.10
5,472.54
4,235.50
670.42
63.90
4,772.74

S 29,830.58 S 24,935.04
S 29,830.58

S 24,935.04
S 539.21
S 539.21

S
S
S
S
S

1,415.92
93.70
93.70
1,322.22
1,322.22

S 8,477.08

S 1,876.33
S 1,876.33
S 2,753.41
S 2,753.41
S 3,847.34
S 3,847.34

S 1,248.67
S 573.25
S 675.42

S 3,525.16
S 2,200.45
S 1,324.71

S
S
S
S
S

4,113.01
1,437.08
1,437.08
2,675.93
2,675.93

S 8,717.98

S
S
S
S
S

1,710.05
27.07
27.07
666.43
666.43

S 12,921.19

S 8,717.98
S 8,717.98

S 123.49
S 123.49

S 795.60
S 795.60
S 220.95

S
S
S
S

S
S
220.95
S
S
S
S
S
S
S
S
28,587.61 S
4,238.76
1,494.90
2,743.86

S
S
S
S

2,206.98
20.01
2,186.97
2,186.97

S 2,542.50
S 2,542.50

4,677.61
3,625.60
918.39
133.62
408.23
408.23
7,711.86
7,711.86
381.30
381.30
76,387.13

S 2,542.50
S 22,891.33
S
S
S
S

1,368.27
927.12
50.65
390.50

S
S
S
S
S

20,771.50
368.14
4,843.82
3,489.82
12,069.72

S 751.56

S 751.56

S 624.66

S
S
S
S
S
S
S
S
S
S
S
S
S
S

2.78
108.56
37.32
3.63
62.67
4.94
469.33
59.19
91.91
134.61
183.62
43.99
12.07
31.92

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

3,012.91
11.65
592.99
196.63
29.49
263.09
58.77
45.01
2,091.71
247.94
457.06
580.00
806.71
164.02
34.99
129.03

S 152.54
S 152.54
S
S
S
S
S
S
S
S
S
S
S
S

961.13
15.63
92.01
50.96
15.25
13.21
12.59
615.56
106.05
196.46
313.05
182.44

S 1,605.41

S 1,605.41
S 51.41
S 1,554.00

S 115.93
S 66.51
S
S
S
S
S
S
S
S
S

S
S
S
S

55.49
25.49
30.00
4,745.11
44.73
1,010.76
169.74
115.12
725.90

3,343.77
684.10
1,382.49
1,277.18

S 345.85

S 5,534.89
S 437.48

S 34.91
S 402.57
S 3,162.79

S
S
S
S

182.77
2,980.02
1,001.14
1,001.14

S
S
S
S

933.48
101.98
831.50
2,457.10

S 345.85

S
S
S
S

8,601.76
2,598.87
6,002.89
5,661.63

S 341.26

S 1,024.15
S 31.17

S 2,457.10
S 2,017.41
S 439.69

S 16,532.35

S
S
S
S

S
S
S
S
S

992.98
111.12
165.42
716.44

1,141.72
36.79
283.21
128.10
155.11

S 290.70
S 290.70

S 531.02
S 425.67
S 105.35

S 1,617.08

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

1,228.46
222.85
165.77
10,268.82
1,832.92
2,282.46
735.22
5,418.22
1,609.01
387.74
146.07
107.73
24.96
12.84
238.87
78.21
612.59

S
S
S
S

3,037.44
484.40
2,553.04
12,302.43

S 484.79

S
S
S
S
S
S
S
S
S
S
S
S

329.14
155.65
1,908.24
470.36
1,370.25
67.63
137.10
120.73
16.37
3,605.57
351.91
167.60

S
S
S
S
S

235.56
163.01
853.29
471.35
1,000.90

S
S
S
S
S

409.93
2.47
11.95
5.70
6.25

S 395.51
S 190.88
S 204.63

S
S
S
S
S

361.95
6,166.73
101.98
6,064.75
4,390.14

S 25.85

S 23.07
S 2.78
S 381.71
S
S
S
S

65.65
316.06
88.90
88.90

S 3,893.68
S 280.44
S 3,613.24
S
S
S
S
S
S
S
S
S

528.81
1.22
527.59
18.13
509.46
455.79
229.07
226.72
226.72

S
S
S
S

635.90
583.52
52.38
52.38

S 1,866.03
S
S
S
S
S

1,866.03
551.54
374.18
940.31
8,807.45

S 814.24
S 577.90
S 236.34

S 7,993.21
S 7,993.21

S
S
S
S
S

174,649.56S 285,479.21S 199,099.16S 202,290.63S 65,832.38 S 50,425.02


4,556.03 S 59,881.05
2,611.90
2,611.90
2,611.90

S
S
S
S
S
S
S

706.87
19.82
8.70
11.12
198.98
198.98
488.07

S 488.07

S 3,510.07

S
S
S
S

2,442.53
1,030.95
867.17
544.41

S 1,067.54
S 1,067.54

S
S
S
S
S
S

341.48
54.42
34.99
19.43
287.06
287.06

S
S
S
S
S
S
S
S

288.57
163.26
104.96
58.30
78.71
78.71
46.60
46.60

S
S
S
S
S
S

91.53
38.09
24.49
13.60
53.44
53.44

S 515.68
S 72.82
S 442.86

S 1,057.97

S
S
S
S
S
S
S
S

83.54
83.54
524.59
524.59
449.84
9.28
440.56
4,657.99

-S 4.66
-S 4.66
S 4,662.65
S 25.49
S 4,637.16
S 680.13

S
S
S
S
S
S
S
S

S
S
S
S
S
S
S
S
S 125,553.21S
S 125,553.21S
S 3,577.96

130.21
130.21
83.87
83.87
466.05
25.49
440.56
49,974.89
9.58
3,160.19
11,769.81
5,667.71
2,362.13
8,481.11
13,599.50
4,924.86
47,087.10 S 18,510.94 S 176,465.80S 4,928.77
47,087.10 S 18,510.94 S 176,465.80S 4,928.77

S 46,329.29
S 46,329.29

S 3,577.96
S 15,868.29 S 33,148.16 S 1,671.07
S 11,539.59 S 14,456.71
S 8,109.47
S 771.13
S 1,624.99
S 122.33
S 3,557.57 S 8,834.66 S 1,671.07

S 89,409.34

S 928.57

S 89,409.34
S 928.57
S 99,953.40
S 45,782.85
S 54,170.55
S 1,032.34
S 1,032.34

S
S
S
S
S

1,652.31
152.00
152.00
1,500.31
1,500.31

S 4,051.56

S
S
S
S 13,509.41 S

S 4,051.56
S 4,051.56

S 260.89
S 260.89

6,105.05
3,672.08
2,432.97
76,022.64

S 1,077.34

S 1,077.34
S 1,077.34

S 4,466.31
S 4,466.31
S 8,782.21

S 2,467.47

S 3,330.46

S
S
S
S
S
S
S
S
S

S 2,467.47

S 2,284.69

S 2,467.47

S 2,467.47

S 1,045.77

S 2,461.30

S 2,461.30

S 8,782.21

S 2,020.35
S 1,491.42
S 528.93

S
S
S
S
S

1,007.95
117.45
117.45
890.50
890.50

S 6,290.44

S
S
S
S
S

2,025.18
459.55
690.92
171.28
533.06

29,156.63
26,708.43
1,156.21
1,291.99
3,560.95
3,560.95
43,305.06
43,305.06
4,928.77 S 4,928.77

S 44,323.38
S
S
S
S

1,635.52
3,093.19
1,631.43
37,963.24

S
S
S
S
S

1,292.23
2.08
2.08
61.44
61.44

S
S
S
S
S
S

60.85
60.85
574.64
335.94
105.08
133.62

S
S
S
S
S
S

170.37
4,111.19
4,111.19
154.07
154.07
49.07

S 11.42
S 11.42

S 37.65
S 37.65
S
S
S
S
S
S
S
S
S
S
S
S
S

593.22
593.22
180.72
180.72
44,540.32
4,876.74
859.06
1,475.18
2,542.50
2,770.26
25.82
2,744.44
2,744.44

S 48.06
S 48.06
S 178,511.06S 180,588.22S 25,824.83 S 60,903.61 S 4,095.73

S 20,089.68 S 98,605.19
S
S
S
S

S
S
S
S
S

1,783.02
1,094.38
65.36
623.28

S 1,779.65

S 456.34
S 1,323.31
17,303.69 S 12,300.86
587.52
5,891.56
5,110.59
5,714.02 S 11,834.97
S 465.89
S 78,590.48
S 23,496.76
S 55,093.72
1,002.97 S 4,246.55
S 714.37

S
S
S
S
S

1,000.90
542.93
238.87
78.21
1,415.48

S
S
S
S
S

255.79
1,687.65
229.45
1,458.20
22.15

S 1,002.97

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

694.72
3.14
123.09
42.46
4.13
70.94
5.56
522.85
66.98
100.39
150.79
204.69
45.64
13.72
31.92

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

4,630.25
11.71
596.16
197.65
29.65
264.46
59.16
45.24
2,100.27
249.24
458.83
582.48
809.72
164.15
35.12
129.03

S 22.15

S 22.15
S 86.09

S 86.09

S 86.09
S
S
S
S

1,757.96
203.96
1,554.00
961.13

S 5.85

S
S
S
S
S
S
S
S
S
S
S
S
S

15.63
92.01
50.96
15.25
13.21
12.59
615.56
106.05
196.46
313.05
182.44
115.93
66.51

S
S
S
S
S
S
S
S
S

55.49
25.49
30.00
7,954.83
41.91
1,001.24
211.51
109.98
679.75

S 5.85

S 5.85

S
S
S
S
S
S

6,525.92
640.74
1,690.73
1,246.57
2,947.88
385.76

S 2,764.30

S 246.19

S 543.07

S 39.44
S 503.63
S 194.69

S 194.69
S 1,093.06
S 1,093.06

S 246.19

S 385.76

S
S
S
S
S

4,686.09
209.78
1,676.39
1,081.34
595.05

S 2,799.92
S 2,799.92

S
S
S
S

S 246.19
933.48
101.98
831.50
44,306.98 S 44,997.43 S 12,723.09 S 47,414.83 S 486.04
S 2,509.10

S 201.85

S 72.57
S 2,436.53 S 201.85
S 41,810.21 S 42,488.33
S 11,777.86
S 30,032.35 S 9,133.19

S 33,355.14
S 2,496.77

S 11,157.67 S 25,833.03 S 486.04


S 11,157.67

S 2,496.77

S 1,363.57
S 1,363.57
S
S
S
S
S
S

S
S
S
S
S
S

4,543.39
1,060.36
3,483.03
2,276.03
574.75
632.25

3,478.99
48.29
1,693.78
105.03
152.80
1,435.95

S 1,736.92
S 1,353.40
S 383.52

S
S
S
S
S

1,092.89 S 486.04
24,740.14
21,581.80
4,729.63
16,852.17

S 47,681.21 S 6,285.27
S 2,244.88

S 5,318.53

S 2,244.88

S
S
S
S
S
S
S
S
S
S
S
S
S

S 5,318.53
1,819.58
253.84
166.78
1,398.96
42,496.63 S 966.74
2,699.10
13,885.85
2,125.73 S 966.74
23,785.95
1,120.12
356.92
763.20
24,482.70

S 36.57

S 367.68

S 211.41
S 156.27
S 8,269.56
S
S
S
S
S
S
S
S
S

1,339.02
1,081.88
5,848.66
1,839.77
353.16
146.07
107.73
24.96
12.84

S 36.57

S 238.87
S 78.21
S 877.93
S 36.57

S
S
S
S
S

4,378.25
68.08
573.95
266.62
307.33

S 1,207.71
S 897.15
S
S
S
S
S

310.56
1,579.03
1,332.25
246.78
949.48

S 211.38

S
S
S
S

14,005.69
739.34
13,266.35
13,466.62

S 98.96

S 965.97

S 600.70
S 365.27
S 1,398.03
S 1,354.25
S 43.78

S 4,884.88
S 425.59
S 28.06

S 98.96

S 98.96
S 458.00
S 280.10

S
S
S
S
S

S
S
S
S

3,018.49
9.88
47.77
22.75
25.02

2,960.84
763.53
1,081.11
1,116.20

S
S
S
S
S
S
S
S
S

36.41
1,657.49
859.87
1,334.53
542.93
6,217.74
50.99
6,166.75
12,120.96

S 84.22

S 103.37

S 92.10
S 11.27
S 151.06

S 151.06
S 355.62
S 355.62

S 84.22

S 84.22
S 11,510.91
S 611.87
S 10,899.04
S
S
S
S
S
S
S
S
S

829.76
1.71
828.05
25.38
802.67
862.67
230.60
632.07
632.07

S
S
S
S

854.75
583.52
271.23
271.23

S 1,460.68
S
S
S
S
S

1,460.68
146.19
374.18
940.31
12,137.93 S 30,340.05 S 13,101.74 S 13,488.78 S 3,389.94

S 595.40
S 359.06
S 236.34

S 441.88

S 402.50
S 39.38
S 11,542.53 S 29,898.17 S 4,361.37
S 10,819.51
S 723.02
S 9,960.72
S 15,423.85
S 4,513.60 S 4,361.37
S 8,433.32
S 8,433.32

S 3,389.94
S 3,389.94

S 307.05
S 307.05
S
S
S
S
S

15,220.00
15,220.00
2,200.00
8,400.00
2,200.00

S 2,420.00

S 13,488.78
S 2,828.78
S 10,660.00

S
S
S
S
S

76,952.56
62,072.01
2,542.50
1,438.05
10,900.00

S 953,695.68S 961,433.31S 468,844.70S 368,876.71S 441,661.64S 332,939.01


S 633,464.60S 695,829.65S 281,781.28S 191,533.82S 227,438.70S 174,720.91
S 333,293.49S 345,869.58S 157,030.38S 107,784.74S 42,074.38 S 105,933.52

S 12,701.81

S
S
S
S
S
S

3,023.56
882.88
716.12
67.39
99.37
2,140.68

S
S
S
S
S
S
S
S
S
S
S
S
S
S

1,646.44
494.24
8,795.19
222.97
201.98
8.40
12.59
505.45
505.45
8,066.77
8,066.77
856.27
856.27
26.79

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S

26.79
5,977.42
10.11
4.32
5.79
75.61
27.57
35.21
9.16
3.67
119.30
119.30
2,414.36
1,077.62
764.64
572.10
298.41
298.41
3,059.63
27.83
3,031.80

S 233,631.61S 306,422.28S 127,434.13S 75,941.78 S 42,074.38 S 105,933.52

S 233,631.61S 203,932.06S 12.47


S 208,776.69
S 24,854.92 S 17,018.24
S 35,172.90
S 55,944.49
S 95,796.43 S 12.47
S
S
S

S
S
S

S 76,679.28

S 76,679.28
102,480.94S 127,421.66S 75,941.78 S 42,074.38 S 2,437.21
63,745.80
38,735.14 S 16,596.95
S 85,593.44
S 25,231.27 S 31,529.81
S 44,411.97 S 565.81
S 26,136.32
S 15,372.25 S 2,437.21
9.28
S 26,817.03
9.28
S 26,817.03
1,703.76 S 29,596.25 S 31,842.96

S 1,703.76
S 1,703.76

S 4,284.12
S 4,284.12
S 29,596.25 S 27,558.84
S 568.71
S
S
S
S
S
S
S
S
S
S
S

226.64
446.60
557.62
338.94
513.24
4,275.24
5,148.27
6,775.86
3,382.38
5,347.66
2,015.09

S
S
S
S
S
S

242.53
3,528.00
5,250.00
1,914.20
1,409.10
15,215.01

S 80,982.65 S 37,743.54

S
S
S
S
S
S
S
S

112.30
19,272.60
8,741.59
3,643.28
13,367.97
20,306.64
473.92
15,064.35

S
S
S
S
S

12,060.00
6,346.52
2,644.98
4,276.49
12,415.55

S 8,079.44

S 6,984.91
S 196,956.60S 235,547.77S 120,915.28S 64,645.64 S 126,987.70S 50,492.46

S 46,713.95
S 46,713.95

S 67,979.14
S 67,979.14

S 416.80

S 2,572.45

S 13,147.08 S 9,684.91

S 5,268.46

S 416.80

S 2,572.45

S 10.59
S 12,907.91
S 228.58
S 4,226.17
S 5,458.74

S 5,268.46

38,822.27
38,822.27

09,963.66

05,160.41

S 50,780.29
S 7,308.71
S 9,890.14

S 22,188.35 S 87,188.85 S
S
S 3,291.66 S 19,764.71 S
S 2,454.34 S 5,657.20
S 2,086.55
S 9,831.34 S 58,347.90 S
S 4,524.46 S 3,419.04
S 16,469.51 S 82,941.17
S 16,469.51 S 82,941.17
S 43,605.65 S 58,134.29 S
S
S 43,605.65 S 58,134.29

S 6,866.66
S 6,866.66

S
S
S
S

31,568.12 S 11,777.02
18,913.03 S 11,777.02
3,202.10

9,452.99

50,189.46 S 31,251.53
50,189.46 S 31,251.53

36,585.25 S 8,470.01
22,937.11
4,366.02
9,282.12 S 5,180.91

S 117,302.79S 45,224.00

S 38,292.19
S 3,289.10

S 1,628.35
S 115,674.44S 6,931.81

S 103,214.51S 114,412.30S 3,835.62

S 38,013.31 S 109,047.67
S 5,025.36

S 1,309.47
S 3,715.89
S 35,923.57 S 15,098.79
S 5,623.42
S 9,027.48
S 21,272.67 S
S
S
S
S
S 2,089.74 S
S
S
S
S
S
S
S 2,089.74
S
S
S
S
S

14,511.64
587.15
75,132.96
23,872.76
51,260.20
6,332.64
828.62
1,167.71
723.90
238.87
78.21
2,975.83
319.50
7,457.92
203.96
7,253.96
22.54

S 19,103.44 S 58,376.62 S 18,294.93

S 22.54

S 22.54
S 107.93

S 107.93

S 107.93

S 5.85

S 5.85

S 5.85

S 375.80

S 375.80

S 375.80

S 65,201.20 S 4,852.51

S 3,835.62

S 2,282.36

S 2,217.21

S 65.47
S 2,216.89
S 65,201.20 S 2,570.15

S 2,217.21

S 19,103.44 S 58,376.62 S 15,824.76

S 9,086.06
S 56,115.14 S 2,570.15
S 1,618.41
S 1,618.41

S 16,386.14 S 38,088.19 S 15,824.76


S 16,386.14

S 2,717.30
S 2,717.30

S
S
S
S

S 2,605.50
38,088.19 S 13,219.26
20,288.43
3,350.41
16,938.02

S 34.39

S 34.39

S 34.39

S 150.90

S 150.90

S 150.90

S 84.22

S 84.22
S 84.22

S 2,200.66

S 2,200.66
S 2,200.66

S 320,231.08S 264,413.90S 161,087.79S 110,327.01S 195,036.72S 151,591.46


S 49,011.24 S 6,219.93
S 113,521.51S 127,937.60
S 113,521.51S 124,879.26

S 113,521.51S 65,198.43
S 112,603.89
S 917.62
S 8,140.62
S 1,286.81
S 20,560.20
S 35,210.80
S
S
S
S
S

59,671.55
31,354.76
8,542.46
8,606.60
11,167.73

S 9.28
S 9.28
S 1,185.20

S 3,058.34

S 1,185.20

S 3,058.34
S 454.49

S 1,185.20
S
S
S
S
S
S
S
S

S 4,251.26

S
S
S
S
S
S
S
S

1,507.09
1,507.09
306.01
306.01
2,438.16
64.93
2,373.23
2,380.99

S 2,380.99
S 50.99

56.66
44.66
119.49
75.32
73.32
712.54
1,144.06
377.80

S 2,330.00
S 99.34

S
S
S
S

99.34
25.49
73.85
41,094.45 S 6,219.93

S
S
S
S
S
S
S
S

829.81
7,896.16
3,548.07
1,765.55
6,339.12
7,733.17
1,932.96
11,049.61

S
S
S
S
S
S
S

386.41
S 2,199.01
5,053.08
1,978.92
964.64
2,666.56
67,133.19 S 120,304.81S 76,371.79 S 92,295.75 S 64,010.36 S 16,587.08
668.79

S 901.07
S 688.21

S 2,431.64
S 2,199.01

S 668.79
S 26,842.19
S 26,842.19

S 4,987.11
S 959.95
S 4,027.16

S 20,834.86 S
S
S 20,834.86 S
S
S
S 18,787.35 S

75,406.38 S 3,322.66
59,744.32 S 3,322.66
15,662.06
24,778.51
24,778.51
20,119.92 S 28,069.65

S 4,961.59

S 103.37
S 1,425.52
S 3,432.70

S 2,692.21
S 2,692.21

S
S
S
S

28,069.65
16,250.59
3,281.00
8,538.06

S
S
S
S
S

2,720.06
1,170.73
901.71
647.62
16,067.29 S 17,427.71
S 14,517.02
S 10,227.99 S 2,910.69
S 5,839.30
S 13,385.63 S
S
S 1,907.47 S
S 2,541.01 S
S 667.70
S 5,727.53 S
S 2,541.92
S 12,485.20 S
S 12,485.20 S
S 19,108.65 S
S
S 19,108.65 S

S
S
S
S

33,208.63 S 2,276.88
7,543.93 S 2,276.88
6,495.24
54.68
19,114.78
19,326.22
19,326.22
18,195.28 S 15,442.81 S 5,871.08
4,747.23 S 15,442.81 S 5,871.08
13,448.05

16,578.51 S
9,537.21
1,397.13
4,628.17
S
S 1,016.00 S
S
S 87,460.26 S 67,707.50 S 17,118.98 S 13,307.28 S
S 87,460.26 S 67,707.50 S 17,118.98 S 13,307.28 S

41,329.08 S 10,716.00

1,537.50 S 10,716.00
557.58
39,234.00
12,599.17 S 1,688.72
12,599.17 S 1,688.72

S 3,584.91

S 12,132.53 S 12,132.53 S 12,132.53 S 12,599.17 S 1,688.72

S 3,584.91

S 12,132.53 S 12,132.53 S 12,132.53 S 12,599.17 S 1,253.37


S 435.35

S
S
S
S

3,512.51
2,392.60
1,119.91
46,141.57

S 592.81
S 592.81

S
S
S
S
S
S
S
S
S

16,894.43
14,697.00
1,621.33
576.10
1,959.43
1,959.43
26,694.90
26,694.90
19,490.29

S
S
S
S
S

1,679.45
1,188.91
1,670.65
14,951.28
14,730.98 S 55,574.97 S 4,986.45

S
S
S
S

14,730.98 S 3,388.21
5,124.36
8,453.60
1,153.02 S 942.69
S 2,445.52
S
S
S
S

50,301.62
50,301.62
1,885.14
1,885.14

S 1,174.75

S 4,986.45

S 1,174.75

S 4,076.62
S 909.83

S 1,174.75

S 116,626.39S 70,181.66 S 67,597.02 S 4,723.98

S 82,348.25
S 1,443.93

S 370.95
S 1,072.98
S 2,467.64

S
S
S
S
S
S
S
S
S
S
S
S

2,123.00
344.64
72,655.10
22,942.76
49,712.34
3,428.20
608.15
834.08
361.95
238.87
78.21
1,114.87

S
S
S
S
S

192.07
2,353.38
178.46
2,174.92
20.28

S 4,905.68

S 5,378.06

S 20.28

S 20.28
S 85.70

S 85.70

S 85.70

S 5.85

S 5.85

S 5.85

S 215.47

S 215.47

S 215.47

S 2,373.05

S 57,458.99 S 51,417.59 S 4,723.98

S 4,905.68

S 2,171.06

S 2,373.05

S 1,681.47

S 2,373.05

S 1,681.47

S 1,816.60

S 4,723.98

S 4,905.68

S 2,171.06

S 1,816.60

S 4,723.98

S 4,905.68

S 2,171.06

S
S
S
S
S
S

1,555.80
308.93
145.81
1,101.06
54,035.15 S 48,463.48
2,157.34 S 4.44
S 39,632.62
S 8,826.42
S 51,877.81
S 186.57
S 1,137.51
S 186.57
S 374.31
S 763.20
S 14.82

S 14.82

S 14.82

S 72.29

S 72.29

S 72.29

S 21.06

S 21.06
S 21.06

S 31,577.79 S 12,722.67 S 16,179.43

S 3,098.83

S 441.88

S
S
S
S
S
S
S

402.50
39.38
31,135.91 S 6,672.95
2,826.31
10,683.74
15,423.85
2,202.01 S 6,672.95
S 6,049.72
S 6,049.72

S 2,383.60
S 2,383.60

S 3,098.83
S 3,098.83

S 1,189.76
S 1,189.76
S 1,189.76

S
S
S
S
S
S

S 1,189.76
S 1,189.76

S 7,466.70
S 6,124.44

S
S
S
S
S

S
S

13,795.83
3,135.83
10,660.00
25,975.63 S 67,015.88 S 19,186.22 S 6,186.64
25,975.63 S 67,015.88 S 19,186.22 S 6,186.64
25,975.63 S 67,015.88 S 11,437.65 S 6,186.64

S
S
S
S
S
S

32,867.10
620.30
16,997.07
937.38
5,183.57
9,128.78

S 2,244.15

S
482.33
S
859.93
S
S
18,500.83 S 34,147.60 S
13,989.73
4,511.10 S 15,990.81
S 13,208.15
S 4,948.64 S
S
8.10
S 1.18
S
8.10
S 1.18
S
S

92.07
210.21
74.53
1,867.34
3,152.19

S
S
S
S

402.18
402.18
7,346.39
213.33

S
S
S
S
S
S
S
S

133.98
39.83
712.54
2,860.15
797.16
376.27
1,176.00
750.00

1,281.58
1,870.61
6,041.31
6,041.31
7,748.57

S 6,186.64

S 6,186.64

S 287.13

S 440.00

S 440.00

S 440.00

S 60,602.84 S 40,323.80 S 22,942.88 450 das?


S 9,122.37
380 das?
05,933.52
357 das?
37 das?
8 das?
1 da?
1 da?
6 das?
11 das?
3 das?
8 das?
6 das?
4 das?
2 das?
5 das?
1 da?
2 das?
2 das?
7 das?
6 das?
1 da?
36 das?
2 das?
1 da?
1 da?
9 das?
3 das?
1 da?
1 da?
5 das?
1 da?
1 da?
1 da?
2 das?
11 das?
2 das?
1 da?
1 da?
2 das?
1 da?
1 da?
1 da?
4 das?
1 da?
2 das?
1 da?
4 das?

1 da?
2 das?
1 da?
5 das?
5 das?
5 das?
5 das?
3 das?
1 da?
1 da?
1 da?
6 das?
6 das?
1 da?
1 da?
1 da?
1 da?
1 da?
2 das?
2 das?
2 das?
2 das?
2 das?
1 da?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
77 das?
2 das?
2 das?
75 das?
50 das?
49 das?
6 das?
8 das?
14 das?
15 das?
10 das?
6 das?
2 das?
2 das?
1 da?
1 da?
158 das?

4 das?
3 das?
1 da?
97 das?
3 das?
1 da?
2 das?
1 da?
1 da?
6 das?
1 da?
1 da?
4 das?
1 da?
3 das?
4 das?
1 da?
3 das?
17 das?
2 das?
9 das?
6 das?
3 das?
1 da?
1 da?
1 da?
5 das?
1 da?
2 das?
2 das?
18 das?
1 da?
6 das?
11 das?
3 das?
1 da?
1 da?
1 da?
20 das?
8 das?
12 das?
11 das?
11 das?
5 das?
1 da?
2 das?
3 das?

1 da?
2 das?
8 das?
8 das?
1 da?
1 da?
1 da?
1 da?
1 da?
4 das?
4 das?
5 das?
5 das?
81 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
15 das?
2 das?
1 da?
1 da?
10 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
5 das?
1 da?
3 das?
1 da?
2 das?
2 das?
2 das?
1 da?
1 da?
17 das?
2 das?
1 da?
1 da?
11 das?
2 das?
1 da?

05,933.52

1 da?
8 das?
1 da?
1 da?
1 da?
5 das?
1 da?
3 das?
1 da?
3 das?
2 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
3 das?
2 das?
1 da?
316 das?
55 das?
55 das?
178 das
26 das
12 das
20 das
10 das
16 das
18 das
112 das?
9 das?
10 das?
19 das?
20 das
20 das?
18 das?
16 das
103 das?
1 da?
1 da?
199 das?
3 das?
2 das?
1 da?
28 das?
28 das?

35 das?
4 das?
11 das?
20 das
7 das
7 das
141 das?
8 das
21 das
1 da?
5 das
1 da?
9 das?
7 das
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
10 das
1 da?
1 da?
31 das?
4 das?
3 das?
1 da?
24 das?
24 das?
1 da?
1 da?
2 das?
1 da?
1 da?
29 das?
4 das?
3 das?
1 da?
9 das?
9 das?
1 da?
1 da?
15 das?
1 da?
1 da?

S 8,832.94

27 das?
4 das?
3 das?
1 da?
17 das?
17 das?
1 da?
1 da?
5 das?
1 da?
1 da?
138 das?
1 da?
16 das?
69 das?
49 das
52 das
52 das?
52 das
55 das
12 das?
115 das?
3 das?
11 das?
4 das?
2 das?
40 das
7 das?
22 das?
33 das?
283 das?
39 das?
28 das
11 das?
219 das?
1 da?
36 das?
30 das?
15 das?
35 das
59 das?
58 das?
1 da?
26 das?
26 das?
71 das?
44 das?

S 8,832.94
S 8,832.94

12 das?
30 das
29 das?
11 das?
1 da?
10 das?
3 das?
44 das?
11 das?
33 das
20 das?
83 das?
42 das?
41 das
17 das?
4 das?
41 das
9 das?
31 das
31 das
95 das
42 das
40 das
10 das
10 das
112 das?
22 das?
3 das?
17 das?
12 das
37 das?
21 das
160 das?
160 das?
16 das?
16 das?
160 das?
39 das?
2 das?
106 das?
1 da?
133 das?
1 da?
3 das?
133 das?
15 das?
8 das?

1 da?
1 da?
21 das?
21 das
19 das?
134 das?
1 da?
1 da?
133 das?
50 das
1 da?
5 das?
5 das?
63 das?
8 das?
39 das
2 das?
14 das?
14 das?
16 das?
16 das?
29 das?
7 das?
23 das
29 das?
20 das
4 das?
24 das?
1 da?
1 da?
23 das?
6 das?
1 da?
2 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
22 das?
1 da?
1 da?
21 das?
1 da?
1 da?
1 da?

S 289.43

1 da?
3 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
15 das?
15 das?
370 das?
20 das?
16 das?
3 das?
1 da?
216 das?
1 da?
206 das?
141 das?
2 das?
3 das?
7 das?
1 da?
52 das?
1 da?
26 das?
12 das?
12 das?
1 da?
3 das?
2 das?
1 da?
42 das?
2 das?
2 das?
1 da?
1 da?
1 da?
15 das?
1 da?
2 das?
2 das?
1 da?
1 da?
216 das?
1 da?

8 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
210 das?
1 da?
1 da?
1 da?
216 das?
1 da?
13 das?
4 das?
1 da?
1 da?
1 da?
1 da?
5 das?
1 da?
2 das?
1 da?
1 da?
206 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
216 das?
1 da?
7 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
212 das?
1 da?

1 da?
1 da?
2 das?
1 da?
1 da?
216 das?
1 da?
23 das?
1 da?
3 das?
4 das?
1 da?
1 da?
13 das?
1 da?
5 das?
5 das?
2 das?
201 das?
10 das?
1 da?
2 das?
2 das?
1 da?
1 da?
330 das?
1 da?
246 das?
2 das?
13 das?
1 da?
58 das?
172 das?
46 das?
106 das?
20 das?
268 das?
22 das
1 da?
12 das?
24 das
25 das?
24 das?
1 da?
84 das?
2 das?
82 das?

2 das?
45 das?
1 da?
2 das?
3 das?
1 da?
1 da?
1 da?
32 das?
1 da?
5 das?
20 das?
6 das?
3 das?
2 das?
1 da?
328 das?
1 da?
34 das?
1 da?
5 das?
7 das?
2 das?
6 das?
13 das?
2 das?
4 das?
4 das?
3 das?
301 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
4 das?
3 das?
1 da?
328 das?
1 da?
32 das?
1 da?
8 das?

8 das?
8 das?
7 das?
4 das?
2 das?
1 da?
1 da?
1 da?
1 da?
317 das?
5 das?
1 da?
1 da?
2 das?
2 das?
10 das?
3 das?
2 das?
1 da?
2 das?
1 da?
1 da?
328 das?
1 da?
9 das?
1 da?
1 da?
1 da?
1 da?
5 das?
2 das?
2 das?
1 da?
318 das?
2 das?
1 da?
4 das?
3 das?
1 da?
3 das?
1 da?
2 das?
1 da?
1 da?
15 das?
1 da?
14 das?

S 289.43

S 289.43
S 289.43

S 51,480.47 S 39,934.30 S 2,616.36


S 51,189.36 S 39,724.12
S 45,351.20 S 39,724.12

S 28,180.45

S 28,180.45
S 45,351.20 S 4,962.82

S
S
S
S

2,399.80
27,638.41
13,730.65
1,582.34 S 4,962.82
S 6,580.85
S 6,580.85

S 5,838.16

8 das?
3 das?
3 das?
336 das?
1 da?
44 das?
6 das?
3 das?
2 das?
1 da?
47 das?
17 das?
11 das?
4 das?
15 das?
279 das?
31 das?
11 das?
11 das?
10 das?
1 da?
444 das?
289 das?
289 das?
20 das?
20 das?
124 das?
30 das
8 das?
17 das?
13 das
11 das
14 das
68 das?
5 das?
2 das?
2 das?
13 das?
13 das?
10 das?
23 das?
63 das?
1 da?
1 da?
217 das?
2 das?
1 da?

S 856.82
S 856.82
S 4,981.34

S
S
S
S
S
S
S

20.78
1,934.26
752.54
1,470.00
250.00
191.42
362.34

1 da?
6 das?
6 das?
12 das?
1 da?
3 das?
8 das?
3 das?
3 das?
198 das?
4 das?
9 das?
1 da?
1 da?
1 da?
2 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
2 das?
1 da?
42 das?
5 das?
4 das?
1 da?
34 das?
34 das?
1 da?
1 da?
2 das?
1 da?
1 da?
40 das?
2 das?
1 da?
1 da?
4 das?
4 das?
1 da?
1 da?
2 das?
1 da?

S 210.18

S 2,616.36

1 da?
41 das?
2 das?
1 da?
1 da?
3 das?
3 das?
1 da?
1 da?
2 das?
1 da?
1 da?
60 das?
1 da?
5 das?
20 das?
28 das?
30 das?
15 das?
25 das?
37 das?
3 das?
52 das?
1 da?
4 das?
2 das?
1 da?
26 das?
3 das?
7 das?
11 das?
282 das?
22 das?
18 das?
4 das?
150 das?
12 das
12 das?
10 das?
5 das?
23 das
49 das?
19 das?
30 das
9 das?
9 das?
73 das?

S 210.18
S 210.18

S 2,616.36
S 2,616.36

34 das?
4 das?
20 das?
10 das?
4 das?
1 da?
3 das?
1 da?
26 das?
4 das?
22 das
7 das?
40 das?
14 das?
26 das?
6 das?
2 das?
26 das
3 das?
15 das
15 das
105 das
54 das
51 das
13 das?
13 das?
67 das?
7 das?
1 da?
6 das?
15 das
12 das?
26 das
204 das?
204 das?
4 das?
4 das?
200 das?
18 das?
4 das?
23 das?
1 da?
29 das?
137 das
1 da?
29 das?
4 das?

2 das?
1 da?
1 da?
9 das?
9 das?
5 das?
63 das?
1 da?
1 da?
62 das?
26 das?
1 da?
2 das?
2 das?
24 das?
3 das?
16 das?
1 da?
6 das?
6 das?
5 das?
5 das?
61 das?
2 das?
59 das?
8 das?
39 das?
1 da?
134 das?
3 das?
3 das?
131 das?
54 das
7 das?
13 das?
48 das
2 das?
3 das?
3 das?
7 das?
7 das?
32 das?
1 da?
1 da?
31 das?
6 das?
1 da?

S 291.11

1 da?
1 da?
7 das?
1 da?
4 das?
1 da?
2 das?
2 das?
2 das?
2 das?
15 das?
15 das?
370 das?
138 das?
5 das
4 das?
1 da?
55 das?
1 da?
48 das?
21 das
1 da?
1 da?
2 das?
1 da?
22 das?
1 da?
10 das?
5 das?
5 das?
1 da?
3 das?
2 das?
1 da?
20 das?
1 da?
1 da?
1 da?
1 da?
1 da?
6 das?
1 da?
1 da?
2 das?
1 da?
1 da?
55 das?

1 da?
8 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
49 das?
1 da?
1 da?
1 da?
55 das?
1 da?
11 das?
3 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
47 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
55 das?
1 da?
7 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
51 das?

1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
55 das?
1 da?
19 das?
1 da?
2 das?
2 das?
1 da?
6 das?
7 das?
1 da?
3 das?
2 das?
1 da?
45 das?
5 das?
1 da?
1 da?
2 das?
1 da?
1 da?
209 das?
4 das?
205 das?
5 das?
79 das?
4 das?
89 das
3 das?
1 da?
1 da?
1 da?
28 das?
1 da?
9 das?
10 das
8 das?
4 das?
3 das?
1 da?
206 das?
1 da?

23 das?
1 da?
3 das?
5 das?
2 das?
3 das?
9 das?
1 da?
5 das?
1 da?
2 das?
187 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
3 das?
2 das?
1 da?
206 das?
1 da?
13 das?
1 da?
3 das?
2 das?
3 das?
4 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
200 das?
2 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?

S 291.11

S 291.11
S 291.11

1 da?
2 das?
1 da?
1 da?
206 das?
1 da?
7 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
198 das?
1 da?
1 da?
3 das?
2 das?
1 da?
3 das?
1 da?
2 das?
1 da?
1 da?
15 das?
1 da?
14 das?
6 das
4 das?
4 das?
218 das?
1 da?
59 das?
9 das?
4 das?
3 das?
1 da?
63 das?
22 das?
14 das?
6 das?
21 das?
141 das?
21 das
15 das?

8 das?
7 das
1 da?
367 das?
352 das?
352 das?
6 das?
6 das?
129 das?
40 das
15 das?
14 das?
35 das
34 das
38 das
57 das?
2 das?
4 das?
3 das?
6 das?
7 das?
55 das?
1 da?
1 da?
303 das?
2 das?
1 da?
1 da?
3 das?
3 das?
6 das?
1 da?
1 da?
4 das?
2 das?
2 das?
292 das?
2 das?
4 das?
3 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?

3 das?
10 das?
2 das?
1 da?
1 da?
5 das?
5 das?
1 da?
1 da?
2 das?
1 da?
1 da?
11 das?
3 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
11 das?
2 das?
1 da?
1 da?
3 das?
3 das?
1 da?
1 da?
2 das?
1 da?
1 da?
38 das?
1 da?
6 das?
11 das
19 das
20 das
20 das?
17 das
25 das
8 das?
168 das?
168 das?
6 das?

6 das?
162 das?
29 das?
7 das?
40 das?
2 das?
51 das?
1 da?
1 da?
9 das?
5 das?
4 das?
2 das?
2 das?
13 das?
13 das?
10 das?
161 das?
1 da?
1 da?
160 das?
46 das?
1 da?
2 das?
2 das?
42 das?
5 das?
29 das?
2 das?
10 das?
10 das?
8 das?
8 das?
159 das?
5 das?
154 das?
20 das?
99 das?
2 das?
31 das?
1 da?
1 da?
30 das?
18 das?
1 da?
2 das?
7 das?

1 da?
1 da?
1 da?
1 da?
1 da?
16 das?
1 da?
1 da?
15 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
1 da?
9 das?
9 das?
174 das?
9 das?
6 das
2 das?
1 da?
67 das?
1 da?
59 das?
25 das
1 da?
2 das?
3 das?
1 da?
27 das?
1 da?
12 das?
7 das?
6 das?
1 da?
3 das?
2 das?
1 da?
25 das?
2 das?

1 da?
1 da?
1 da?
1 da?
7 das?
1 da?
2 das?
2 das?
1 da?
1 da?
67 das?
1 da?
8 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
61 das?
1 da?
1 da?
1 da?
67 das?
1 da?
11 das?
3 das?
1 da?
1 da?
1 da?
1 da?
4 das?
1 da?
1 da?
1 da?
1 da?
59 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
67 das?

1 da?
7 das?
1 da?
1 da?
1 da?
1 da?
3 das?
1 da?
1 da?
1 da?
63 das?
1 da?
1 da?
1 da?
2 das?
1 da?
1 da?
68 das?
1 da?
22 das?
1 da?
2 das?
2 das?
1 da?
7 das?
9 das?
1 da?
4 das?
2 das?
2 das?
57 das?
6 das?
1 da?
2 das?
2 das?
1 da?
1 da?
141 das?
1 da?
75 das?
1 da?
8 das?
1 da?
18 das
47 das
15 das
26 das

6 das
116 das?
28 das
1 da?
7 das?
17 das
13 das?
12 das
1 da?
66 das?
2 das?
64 das?
2 das?
19 das
4 das?
18 das
3 das?
1 da?
1 da?
1 da?
21 das?
1 da?
3 das?
13 das?
4 das?
3 das?
2 das?
1 da?
139 das?
1 da?
21 das?
1 da?
2 das?
4 das?
2 das?
3 das?
9 das?
1 da?
4 das?
2 das?
2 das?
122 das?
1 da?
1 da?
1 da?
1 da?
1 da?

1 da?
1 da?
5 das?
1 da?
4 das?
3 das?
1 da?
139 das?
1 da?
18 das?
1 da?
4 das?
4 das?
5 das?
4 das?
2 das?
1 da?
1 da?
1 da?
1 da?
1 da?
132 das?
3 das?
1 da?
1 da?
1 da?
1 da?
4 das?
2 das?
2 das?
1 da?
2 das?
1 da?
1 da?
139 das?
1 da?
9 das?
1 da?
1 da?
1 da?
1 da?
5 das?
2 das?
2 das?
1 da?
129 das?
2 das?

S 389.50

S 389.50
S 389.50

1 da?
4 das?
3 das?
1 da?
3 das?
1 da?
2 das?
1 da?
1 da?
15 das?
1 da?
14 das?
6 das
4 das?
4 das?
151 das?
1 da?
59 das?
9 das?
4 das?
3 das?
1 da?
63 das?
22 das?
14 das?
6 das?
21 das?
74 das?
21 das
15 das?
8 das?
7 das
1 da?
S 20,326.52 449 das?
S 12,746.02 449 das?
1 da?
1 da?
1 da?
S 8,474.00 1 da?
1 da?
S 4,272.02 1 da?
S 7,580.50 104 das?
S 5,760.00 1 da?
S 90.50
1 da?
1 da?
S 1,240.00 1 da?
S 490.00
1 da?

4
1
1
1
1

das?
da?
da?
da?
da?

MEJORAMIENTO Y AMPLIACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y SANEAMIENTO BASICO UR


SUBSISTEMA DE SUCASCO
AGUA POTABLE
POZO TUBULAR (02 UNIDADES)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
INSTALACION DE MAQUINAS Y EQUIPOS
PERFORACION A ROTACION DE CIRCULACION DIRECTA
PERFORACION DE D=575mm (Tub. =375mm) EN MATERIAL TIPO I
PERFORACION DE D=575mm (Tub. =375mm) EN MATERIAL TIPO II
ADQUISICION Y COLOCACION DE TUBERIAS
TUBERIA PVC SAP CLASE 10, D=15"
INSTALACION DE TUBERIA PVC SAP Y FILTRO D = 15"
LAVADO PRELIMINAR Y ENGRAVADO
EXTRACCION, SELECCION Y SUMINISTRO DE GRAVA 3/4 - 1/2"
LAVADO PRELIMINAR EN POZOS
COLOCACION DE GRAVA SELECCIONADA EN POZOS
DESARROLLO DEL POZO CON CHORRO DE ALTA VELOCIDAD
DESARROLLO DEL POZO CON AIRE COMPRIMIDO
CONSTRUCCION DE BASE PARA ANCLAJE EN POZO
CASETA DE BOMBEO (02 UNIDADES)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO
REFINE Y NIVELACION Y COMPACTACION
ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m
OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:10 CEMENTO-HORMIGON
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO HASTA 0.30m
CONCRETO ARMADO
ZAPATAS
CONCRETO FC=175 KG/CM2, PARA ZAPATAS
ACERO CORRUGADO FY= 4200 GRADO 60 EN ZAPATAS
COLUMNAS
CONCRETO F'C=175KG/CM2. PARA COLUMNAS
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
ACERO CORRUGADO FY= 4200 GRADO 60 EN COLUMNAS
VIGAS
CONCRETO FC=175 KG/CM2 PARA VIGAS
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO CORRUGADO FY= 4200 GRADO 60 EN VIGAS
LOSA DE TECHO

CONCRETO F'C=210 KG/CM2. PARA TECHO


ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA TECHO
ACERO CORRUGADO FY= 4200 GRADO 60 EN LOSA DE TECHO
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO SOGA E=20cm MEZCLA 1:5 (CEMENTO:ARENA)
TARRAJEOS
TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO - ARENA
PISOS Y VEREDAS
FALSO PISO DE 4" DE CONCRETO 1:10
PISOS DE CONCRETO SIN COLOREAR ACABADO FROTACHADO E=1.5 CMTS
VEREDA DE CONCRETO DE 4"
CERCO PERIMETRICO
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO NORMAL
REFINE NIVELACION Y COMPACTACION
ELIMINACION MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
CONCRETO SIMPLE FC=140 KG/CM2
ENMALLADO
ENMALLADO CON MARCO METALICO
PINTURA
PINTURA EN INTERIORES AL TEMPLE 2 MANOS
PUERTAS Y VENTANAS
PUERTA METALICA 0.85 x 1.80
VENTANA DE ALUMINIO 1.5M X 0.8M
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS FIERRO
EQUIPOS ELECTROMECANICOS
SUMINISTRO Y COLOCACION DE ELECTROBOMBA
SUBESTACION DE DISTRIBUCION
LINEA DE IMPULSION (L=1108.0 m)
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO NORMAL/ML 0.80X0.50
EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA 0.50x0.70
EXCAVACION - CORTE MANUAL EN TERRENO ROCOSO 0.50X0.70
REFINE NIVELACION Y FONDOS PARA TUBERIA DE AGUA
CAMA DE APOYO (MATERIAL DE PRESTAMO)
RELLENO Y COMPACTADO DE ZANJAS
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PEAD CLASE 10, D=90mm
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS PEAD EN IMPULSION 90mm
RESERVORIO (155 m3)

TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA DE MATERIAL SUELTO
EXCAVACIN C/MAQUINARIA EN TERRENO EN ROCA SUELTA
EXCAVACION C/EQUIPO EN ROCA FIJA
REFINE, NIVELACION Y COMPACTACION
RELLENO CON MATERIAL PROPIO
ACARREO MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO BASE DE RESERVORIO E=4"
CONCRETO EN CIMENTACION
CONCRETO FC=210 KG/CM2, LOSA DE FONDO
ACERO FY= 4,200Kg/cm2, CORTADO Y HABILITADO
CONCRETO EN LOSA FONDO
CONCRETO FC=175 KG/CM2
ACERO FY= 4,200Kg/cm2
CONCRETO MURO CIRCULAR
CONCRETO FC=280KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS
ACERO FY= 4,200Kg/cm2
CONCRETO EN COLUMNA CENTRAL
CONCRETO FC=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4,200Kg/cm2
CONCRETO EN VIGAS DE AMARRE
CONCRETO FC=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4,200Kg/cm2
CONCRETO EN TECHO DE RESERVORIO
CONCRETO FC=210KG/CM2,(RESERVORIO)
ENCOFRADO Y DESENCOFRADO CUPULA
ACERO FY= 4,200Kg/cm2
CONCRETO EN VERTEDERO
CONCRETO FC=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4,200Kg/cm2(ACERO)
REVOQUES Y ENLUCIDOS
TARRAJEO INTERIOR C/IMPERMEABILIZANTE
TARRAJEO INTERIOR Y EXTERIOR
VEREDA PERIMETRAL
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN ROCA SUELTA
REFINE NIVELACION Y COMPACTACION
ELIMINACION MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE

CONCRETO SIMPLE FC=140 KG/CM2


ENCOFRADO Y DESENCOFRADO NORMAL
CERCO PERIMETRICO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN ROCA SUELTA
REFINE NIVELACION Y COMPACTACION
ELIMINACION MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
CONCRETO SIMPLE FC=140 KG/CM2
ENMALLADO
ENMALLADO CON MARCO METALICO
PINTURA
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
OTRAS PARTIDAS
MORTERO PENDIENTE FONDO (MORTERO 1:5)
ESCALERA FG 2"
TAPA METALICA DE 0.60 X 0.60 M2
SUMINISTRO Y COLOCACION DE HIPOCLAROR
TUBERIA DE VENTILACION FG D=2".
DESINFECCION DE RESERVORIO
CASETA DE VALVULAS (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
EXCAVACION MANUAL EN ROCA SUELTA
REFINE Y NIVELACION Y COMPACTACION
ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m
CONCRETO SIMPLE
SOLADO BASE CASETA DE VALV. E=4"
OBRAS DE CONCRETO ARMADO
CONCRETO FC=210 KG/CM2, MUROS - LOSA DE FONDO
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO FY= 4,200Kg/cm2(ACERO)
TARRAJEOS
TARRAJEO MORTERO 1:2 E=1.5cm
ACCESORIOS CASETA DE VALVULAS
SUMINISTRO Y COLOCACION DE TAPA METALICA
SUMINISTRO DE ACCESORIOS 90mm x 90mm EN CASETA DE VALVULAS
CASETA DE CAPTACION C-01 (SECTOR PURUNI)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA ESTRUCTURAS
REFINE, NIVELACION Y COMPACTACION

ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m


CONCRETO SIMPLE
SOLADO E=4"
CONCRETO BAJO FILTRO FC=140 KG/CM2
CONCRETO CUBIERTA FILTRO F'C=175 KG/CM2
CONCRETO ARMADO
CONCRETO FC=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO FY= 4,200Kg/cm2
TARRAJEOS
TARRAJEO CON IMPERMEABILIZANTES, 1:1 E= 1.5CM
TARRAJEO EN EXTERIORES 1:2 E=1.5cm
PINTURA
PINTURA EN MUROS EXTERIORES
FILTROS
FILTRO DE ARENA
FILTRO DE GRAVA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAMARA DE CAPTACION
SISTEMA DE DISTRIBUCION L=54,344 .00 m
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO SUELTO/ML 0.50X0.70
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA
REFINE NIVELACION Y FONDOS PARA TUBERIA DE AGUA
CAMA DE APOYO (MATERIAL DE PRESTAMO)
RELLENO Y COMPACTADO DE ZANJAS
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC SAP CLASE 10, D=90mm
TUBERIA PVC SAP CLASE 10, D=75mm
TUBERIA PVC SAP CLASE 10, D=63mm
TUBERIA PVC SAP CLASE 10, D=1 1/2"
TUBERIA PVC SAP CLASE 10, D=1"
TUBERIA PVC SAP CLASE 10, D=1/2"
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DISTRIBUCION (Sucasco)
VALVULAS (245 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL

OBRAS DE CONCRETO ARMADO


CONCRETO F'C=175 KG/CM2
ACERO FY= 4,200Kg/cm2
ENCOFRADO Y DESENCOFRADO
TARRAJEOS
TARRAJEO MORTERO 1:2 , E=1.5CM
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO Y COLOCACION DE TAPA METALICA
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 90mm
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 75mm
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 63mm
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 1 1/2"
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 1"
SUMINISTRO DE VALVULA DE PURGA 1" x 90mm
SUMINISTRO DE VALVULA DE PURGA 1" x 75mm
SUMINISTRO DE VALVULA DE PURGA 1" x 63mm
SUMINISTRO DE VALVULA DE PURGA 1" x 1 1/2"
SUMINISTRO DE VALVULA DE PURGA 1" x 1"
SUMINISTRO DE VALVULA DE COMPUERTA 90mm
SUMINISTRO DE VALVULA DE COMPUERTA 75mm
SUMINISTRO DE VALVULA DE COMPUERTA 63mm
SUMINISTRO DE VALVULA DE COMPUERTA 1 1/2"
SUMINISTRO DE VALVULA DE COMPUERTA 1"
SUMINISTRO DE VALVULA DE PRESION 63mm
CRUCES DE CARRETERA (5 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE CARRETERA 1
CRUCES DE ALCANTARILLA (03 UNIDAD)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE ALCANTARILLA 1

CRUCES DE RIACHUELO Y ACEQUIAS (07 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE RIACHUELO Y ACEQUIAS 1
CONEXION DOMICILIARIA (780 UNIDADES)
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL
CAMA DE APOYO (MATERIAL DE PRESTAMO)
VALVULA COMPUERTA DE BRONCE 1/2"
UNION UNIVERSAL DE 1/2"
NIPLE FG 1/2"
CAJA PARA VALVULA DE 30X30cm
SUMINISTRO Y COLOCACION DE TAPA METALICA
TUBERIA PVC SAP CLASE 10, D=1/2" (CONEXION URBANA)
LAVADERO MULTIUSO DOMICILIAR(325 UND)
TRAZO Y REPLANTEO
EXCAVACION MANUAL
CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PG.
CONCRETO F'C=175 KG/CM2 LOSA
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4,200Kg/cm2
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS PARA LAVADERO MULTIUSO
LETRINAS ECOLOGICAS (325 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
RELLENO COMPACTADO CON MATERIAL PROPIO
RELLENO CON MATERIAL GRAVA Y CANTO RODADO
RELLENO CON MATERIAL DE PRESTAMO MANUAL
ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m
OBRAS DE CONCRETO CICLOPEO
MURO FOSA MEZCLA 1:10 C:H 50% PG
ENCOFRADO Y DESENCOFRADO EN MUROS BAJOS
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
OBRAS DE CONCRETO ARMADO
LOSAS ARMADA

CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA


ENCOFRADO Y DESENCOFRADO DE LOSA
ACERO FY= 4,200Kg/cm2
COMPUERTA DE MANTENIMIENTO
CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO DE TAPA
ACERO FY= 4,200Kg/cm2
ESCALERA
CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO DE ESCALERA
ACERO FY= 4,200Kg/cm2
ESTRUCTURA DE MADERA Y COBERTURAS
COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)
CORREAS DE MADERA DE 2"X2"X10'
VIGA DE MADERA ROLLIZO DE 2"X1.8m
DINTEL DE MADERA ROLLIZO DE 2"X1.8m
PUERTA METALICA 0.85*1.80
VENTANA DE ALUMINIO, VIDRIO 10MM
MUROS Y TABIQUES
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
REVOQUES Y ENLUCIDOS
TARRAJEO, ACABADO CON CEMENTO-ARENA
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1 EN CAMARAS
PINTURA
PINTURA EN CALAMINAS DE LETRINA (ESMALTE Y ANTIC.)
SISTEMA DE DESAGUE Y AGUA POTABLE
VENTILACION PARA LETRINA ECOLOGICA D=4"
TUBERIA PVC SAP CLASE 10, D=1/2"
TUBERIA PVC SAL CLASE 7.5, D=2"
REVESTIMIENTO DE PISO,ZOCALO DUCHA C/MAYOLICA BLANCA DE 25X25 CM
COLOCACION DE ACCESORIOS DE AGUA Y DESAGE
SUMINISTRO DE ACCESORIOS DE AGUA Y DESAGE
SISTEMA DE ALCANTARILLADO
RED DE ALCANTARILLADO (10,583.4 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL P/ALCANT.
EXCAVACION DE ZANJA,T. ROCA SUELTA
REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 160 mm - 250 mm
REFINE Y NIVELACION ZANJA TERR.SEMIROCA PARA TUB. 160mm - 250 mm
CAMA DE APOYO P/TUBERIA H=0.20, A = 0.60 M
RELLENO COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
SUMINISTRO E INSTALACION DE LA RED DE ALCANTARILLADO
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM

ENTIBADO
ENTIBADO EN ZANJA EN TERRENO DE ROCA SUELTA
PRUEBA HIDRAULICA
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 160 MM
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 200 MM
BUZONES DE INSPECCION
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTICION
TAPA DE CONCRETO
TAPA DE INSPECCION DE 0.60 M
CONEXION DOMOCILIARIA (454 UNIDADES)
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL EN TERRENO SUELTO 0.60X1.0M
CAMA DE APOYO P/TUBERIA H=0.10M
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
EMISOR GENERAL (85.00 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA OBRA P/LINEAS DE DESAGUE
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO NORMAL
REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
CAMA DE APOYO P/TUBERIA H=0.10M
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 250 MM
PRUEBA HIDRAULICA
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 250 MM
BUZONES DE INSPECCION (RED EMISOR)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE

SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M


OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTICION
TAPA DE CONCRETO
TAPA DE INSPECCION DE 0.60 M
PRUEBA DE LABORATORIO
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR DE OBRA
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
CAMARA DE BOMBEO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
EQUIPOS ELECTROMECANICOS
SUMINISTRO Y COLOCACION DE ELECTROBOMBA
SUB ESTACION ALCANTARILLADO
OTROS
COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO
TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=17.5cm, L=4.55m
VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M
PUERTA METALICA 0.85*1.80
VENTANA DE ALUMINIO, VIDRIO 10MM
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAMARA DE BOMBEO
CANAL DE INGRESO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
DESARENADOR
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DESARENADOR
MEDIDOR PARSHALL
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

JUNTAS DE WATER STOP e=1 PULG


PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS MEDIDOR PARSHALL
SEDIMENTADOR PRIMARIO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS SEDIMENTADOR PRIMARIO
FILTRO ANAEROBICO ASCENDENTE FAA
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
SUMINISTRO MATERIAL DE FILTRO
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS FILTRO ANAEROBICO
WETLAND SFS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS

EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL


PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM; DISTRIBUIDOR CRIBADO,L=21.70M
OTROS
MATERIAL DE AMORTIGUACION
MATERIAL DE ESTRATO
VEGETAL FITODEPURADOR
MANTA DE GEOMEMBRANA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS WETLAND SFS
CAMARA DE CONTACTO (7m3)
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)
CORREAS DE MADERA DE 2"X2"X10'
VIGA DE MADERA ROLLIZO DE 2"X1.8m
DINTEL DE MADERA ROLLIZO DE 2"X1.8m
PUERTA METALICA 0.85*1.80
VENTANA DE ALUMINIO, VIDRIO 10MM
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAMARA DE CONTACTO
LECHO DE SECADO DE LODOS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA

RELLENO Y COMPACTADO CON MATERIAL PROPIO


ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM; DISTRIBUIDOR CRIBADO,L=13M
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
COLOCACION DE FILTROS DE GRAVA
COLOCACION DE FILTROS DE ARENA
COLOCACION DE LADRILLOS CON ARENA
COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO
TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=17.5cm, L=4.55m
VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS LECHO DE SECADO
CAJA DE CONTROL DE VALVULAS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAJA DE VALVULAS
SEALIZACION
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
ACCESORIOS
COLOCACION DE SEALIZACION
SUMINISTRO DE SEALIZACION
FORESTACION
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
CERCO FORESTAL

EXCAVACION MANUAL DE TERRENO SUELTO


RELLENO Y COMPACTADO CON MATERIALCOMPUS
SEMBRIO DE ARBOLES
CERCO PERIMETRICO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
MURO DE LADRILLO SOGA E=20cm MEZCLA 1:5 (CEMENTO:ARENA)
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CERCO
SUBSISTEMA DE ALMOSANCHE
AGUA POTABLE
SISTEMA DE DISTRIBUCION L=19,972 .00 m
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO SUELTO/ML 0.50X0.70 (APORTE COMUNAL)
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA
REFINE NIVELACION Y FONDOS PARA TUBERIA DE AGUA
CAMA DE APOYO (MATERIAL DE PRESTAMO)
RELLENO Y COMPACTADO DE ZANJAS
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC SAP CLASE 10, D=90mm
TUBERIA PVC SAP CLASE 10, D=75mm
TUBERIA PVC SAP CLASE 10, D=63mm
TUBERIA PVC SAP CLASE 10, D=1 1/2"
TUBERIA PVC SAP CLASE 10, D=1"
TUBERIA PVC SAP CLASE 10, D=1/2"
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DISTRIBUCION (Almozanche)
VALVULAS (49 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO

TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2
ACERO FY= 4,200Kg/cm2
ENCOFRADO Y DESENCOFRADO
TARRAJEOS
TARRAJEO MORTERO 1:2 , E=1.5CM
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO Y COLOCACION DE TAPA METALICA
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 90mm
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 75mm
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 63mm
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 1 1/2"
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 1"
SUMINISTRO DE VALVULA DE PURGA 1" x 90mm
SUMINISTRO DE VALVULA DE PURGA 1" x 75mm
SUMINISTRO DE VALVULA DE PURGA 1" x 63mm
SUMINISTRO DE VALVULA DE PURGA 1" x 1"
SUMINISTRO DE VALVULA DE COMPUERTA 90mm
SUMINISTRO DE VALVULA DE COMPUERTA 75mm
SUMINISTRO DE VALVULA DE COMPUERTA 63mm
SUMINISTRO DE VALVULA DE COMPUERTA 1 1/2"
SUMINISTRO DE VALVULA DE COMPUERTA 1"
CRUCES DE CARRETERA (7 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE CARRETERA 2
CRUCES DE ALCANTARILLA (02 UNIDAD)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS

SUMINISTRO DE ACCESORIOS CRUCE ALCANTARILLA 2


CRUCES DE RIACHUELO Y ACEQUIAS (01 UNIDAD)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE RIACHUELO Y ACEQUIAS 2
CONEXION DOMICILIARIA (219 UNIDADES)
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL
CAMA DE APOYO (MATERIAL DE PRESTAMO)
VALVULA COMPUERTA DE BRONCE 1/2"
UNION UNIVERSAL DE 1/2"
NIPLE FG 1/2"
CAJA PARA VALVULA DE 30X30cm
SUMINISTRO Y COLOCACION DE TAPA METALICA
TUBERIA PVC SAP CLASE 10, D=1/2" (CONEXION URBANA)
LAVADERO MULTIUSO DOMICILIAR(104 UND)
TRAZO Y REPLANTEO
EXCAVACION MANUAL
CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PG.
CONCRETO F'C=175 KG/CM2 LOSA
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4,200Kg/cm2
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS PARA LAVADERO MULTIUSO
LETRINAS ECOLOGICAS (104 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
RELLENO COMPACTADO CON MATERIAL PROPIO
RELLENO CON MATERIAL GRAVA Y CANTO RODADO
RELLENO CON MATERIAL DE PRESTAMO MANUAL
ACARREO DE MATERIAL EXCEDENTE HASTA Prom = 30m
OBRAS DE CONCRETO CICLOPEO
MURO FOSA MEZCLA 1:10 C:H 50% PG
ENCOFRADO Y DESENCOFRADO EN MUROS BAJOS
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
OBRAS DE CONCRETO ARMADO

LOSAS ARMADA
CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO DE LOSA
ACERO FY= 4,200Kg/cm2
COMPUERTA DE MANTENIMIENTO
CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO DE TAPA
ACERO FY= 4,200Kg/cm2
ESCALERA
CONCRETO F'C=175 KG/CM2 , SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO DE ESCALERA
ACERO FY= 4,200Kg/cm2
ESTRUCTURA DE MADERA Y COBERTURAS
COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)
CORREAS DE MADERA DE 2"X2"X10'
VIGA DE MADERA ROLLIZO DE 2"X1.8m
DINTEL DE MADERA ROLLIZO DE 2"X1.8m
PUERTA METALICA 0.85*1.80
VENTANA DE ALUMINIO, VIDRIO 10MM
MUROS Y TABIQUES
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
REVOQUES Y ENLUCIDOS
TARRAJEO, ACABADO CON CEMENTO-ARENA
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1 EN CAMARAS
PINTURA
PINTURA EN CALAMINAS DE LETRINA (ESMALTE Y ANTIC.)
SISTEMA DE DESAGUE Y AGUA POTABLE
VENTILACION PARA LETRINA ECOLOGICA D=4"
TUBERIA PVC SAP CLASE 10, D=1/2"
TUBERIA PVC SAL CLASE 7.5, D=2"
REVESTIMIENTO DE PISO,ZOCALO DUCHA C/MAYOLICA BLANCA DE 25X25 CM
COLOCACION DE ACCESORIOS DE AGUA Y DESAGE
SUMINISTRO DE ACCESORIOS DE AGUA Y DESAGE
SISTEMA DE LA RED DE ALCANTARILLADO
RED DE ALCANTARILLADO (2,291.8 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL P/ALCANT.
EXCAVACION DE ZANJA,T. ROCA SUELTA
REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 160 mm - 250 mm
REFINE Y NIVELACION ZANJA TERR.SEMIROCA PARA TUB. 160mm - 250 mm
CAMA DE APOYO P/TUBERIA H=0.20, A = 0.60 M
RELLENO COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
SUMINISTRO E INSTALACION DE LA RED DE ALCANTARILLADO
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM

SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM


ENTIBADO
ENTIBADO EN ZANJA EN TERRENO DE ROCA SUELTA
PRUEBA HIDRAULICA
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 160 MM
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 200 MM
BUZONES DE INSPECCION
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTICION
TAPA DE CONCRETO
TAPA DE INSPECCION DE 0.60 M
CONEXION DOMICILIARIA (115 UNIDADES)
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL EN TERRENO SUELTO 0.60X1.0M
CAMA DE APOYO P/TUBERIA H=0.10M
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
EMISOR GENERAL (1040.40 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA OBRA P/LINEAS DE DESAGUE
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO NORMAL
REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
CAMA DE APOYO P/TUBERIA H=0.10M
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 250 MM
SUM. E INST. TUB PVC SAP ISO 1452 DN 110 MM
PRUEBA HIDRAULICA
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 250 MM
BUZONES DE INSPECCION (RED EMISOR)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA


OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTICION
TAPA DE CONCRETO
TAPA DE INSPECCION DE 0.60 M
PRUEBA DE LABORATORIO
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR DE OBRA
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
CAMARA DE BOMBEO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
EQUIPOS ELECTROMECANICOS
SUMINISTRO Y COLOCACION DE ELECTROBOMBA
SUB ESTACION ALCANTARILLADO
OTROS
COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO
TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=70cm, L=3.2m
VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M
PUERTA METALICA 0.85*1.80
VENTANA DE ALUMINIO, VIDRIO 10MM
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAMARA DE BOMBEO

CANAL DE INGRESO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
DESARENADOR
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DESARENADOR
MEDIDOR PARSHALL
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2

OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS MEDIDOR PARSHALL
SEDIMENTADOR PRIMARIO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS SEDIMENTADOR 1
WETLAND SFS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM; DISTRIBUIDOR CRIBADO,L=33m
OTROS
MATERIAL DE AMORTIGUACION
MATERIAL DE ESTRATO
VEGETAL FITODEPURADOR
MANTA DE GEOMEMBRANA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS WETLAND SFS
CAMARA DE CONTACTO (2m3)

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA


MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)
CORREAS DE MADERA DE 2"X2"X10'
VIGA DE MADERA ROLLIZO DE 2"X1.8m
DINTEL DE MADERA ROLLIZO DE 2"X1.8m
PUERTA METALICA 0.85*1.80
VENTANA DE ALUMINIO, VIDRIO 10MM
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAMARA DE CONTACTO
LECHO DE SECADO DE LODOS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
CONCRETO FC=175 KG/CM2
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM; DISTRIBUIDOR CRIBADO,L=6.3M
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
COLOCACION DE FILTROS DE GRAVA
COLOCACION DE FILTROS DE ARENA
COLOCACION DE LADRILLOS CON ARENA
COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO

TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=0.80m, L=3.9m


VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS LECHO DE SECADO
CAJA DE CONTROL DE VALVULAS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAJA DE VALVULAS
SEALIZACION
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
ACCESORIOS
COLOCACION DE SEALIZACION
SUMINISTRO DE SEALIZACION
FORESTACION
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
CERCO FORESTAL
EXCAVACION MANUAL DE TERRENO SUELTO
RELLENO Y COMPACTADO CON MATERIALCOMPUS
SEMBRIO DE ARBOLES
CERCO PERIMETRICO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
MURO DE LADRILLO SOGA E=20cm MEZCLA 1:5 (CEMENTO:ARENA)
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1

PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE


ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CERCO
SUBSISTEMA DE COATA
AGUA POTABLE
SISTEMA DE DISTRIBUCION L=5,708 .00 m
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO SUELTO/ML 0.50X0.70
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
EXCAVACION MANUAL DE ZANJAS EN ROCA SUELTA
REFINE NIVELACION Y FONDOS PARA TUBERIA DE AGUA
CAMA DE APOYO (MATERIAL DE PRESTAMO)
RELLENO Y COMPACTADO DE ZANJAS
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC SAP CLASE 10, D=90mm
TUBERIA PVC SAP CLASE 10, D=75mm
TUBERIA PVC SAP CLASE 10, D=63mm
TUBERIA PVC SAP CLASE 10, D=1 1/2"
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DISTRIBUCION (Coata)
VALVULAS (23 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2
ACERO FY= 4,200Kg/cm2
ENCOFRADO Y DESENCOFRADO
TARRAJEOS
TARRAJEO MORTERO 1:2 , E=1.5CM
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO Y COLOCACION DE TAPA METALICA
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 75mm
SUMINISTRO DE VALVULAS DE AIRE 1/2" x 63mm
SUMINISTRO DE VALVULA DE PURGA 1" x 90mm
SUMINISTRO DE VALVULA DE PURGA 1" x 75mm
SUMINISTRO DE VALVULA DE PURGA 1" x 63mm
SUMINISTRO DE VALVULA DE COMPUERTA 90mm
SUMINISTRO DE VALVULA DE COMPUERTA 75mm

SUMINISTRO DE VALVULA DE COMPUERTA 63mm


SUMINISTRO DE VALVULA DE COMPUERTA 1 1/2"
CRUCES DE CARRETERA (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE CARRETERA 3
CRUCES DE ALCANTARILLA (01 UNIDAD)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE ALCANTARILLA 3
CRUCES DE RIACHUELO Y ACEQUIAS (01 UNIDAD)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA DE TERRENO NORMAL
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO F'C=140 KG/CM2
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CRUCE RIACHUELO Y ACEQUIAS 3
CONEXION DOMOCILIARIA (239 UNIDADES)
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL
CAMA DE APOYO (MATERIAL DE PRESTAMO)
VALVULA COMPUERTA DE BRONCE 1/2"
UNION UNIVERSAL DE 1/2"
NIPLE FG 1/2"
CAJA PARA VALVULA DE 30X30cm
SUMINISTRO Y COLOCACION DE TAPA METALICA
TUBERIA PVC SAP CLASE 10, D=1/2" (CONEXION URBANA)
SISTEMA DE LA RED DE ALCANTARILLADO
RED DE ALCANTARILLADO (4,012.10 ML)

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL P/ALCANT.
EXCAVACION DE ZANJA,T. ROCA SUELTA
REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 160 mm - 250 mm
REFINE Y NIVELACION ZANJA TERR.SEMIROCA PARA TUB. 160mm - 250 mm
CAMA DE APOYO P/TUBERIA H=0.20, A = 0.60 M
RELLENO COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
SUMINISTRO E INSTALACION DE LA RED DE ALCANTARILLADO
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM
ENTIBADO
ENTIBADO EN ZANJA EN TERRENO DE ROCA SUELTA
PRUEBA HIDRAULICA
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 160 MM
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 200 MM
BUZONES DE INSPECCION
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTICION
TAPA DE CONCRETO
TAPA DE INSPECCION DE 0.60 M
CONECCION DOMOCILIARIA (292 UNIDADES)
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL EN TERRENO SUELTO 0.60X1.0M
CAMA DE APOYO P/TUBERIA H=0.10M
RELLENO Y COMP.MAT.PROPIO EN ZANJAS
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
EMISOR GENERAL (85.00 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA OBRA P/LINEAS DE DESAGUE
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO NORMAL
REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
CAMA DE APOYO P/TUBERIA H=0.10M

RELLENO Y COMP.MAT.PROPIO EN ZANJAS


ELIMINACION DE MATERIAL EXCEDENTE D= 5KM
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 250 MM
PRUEBA HIDRAULICA
PRUEBA HIDRAULICA A ZANJA TAPADA PARA TUB. 250 MM
BUZONES DE INSPECCION (RED EMISOR)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO F'C=100 KG/CM2, E =0.20 M
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3 C:A, E= 1.5 CM P/CAJA DE REPARTICION
TAPA DE CONCRETO
TAPA DE INSPECCION DE 0.60 M
PRUEBA DE LABORATORIO
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR DE OBRA
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
CAMARA DE BOMBEO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
EQUIPOS ELECTROMECANICOS
SUMINISTRO Y COLOCACION DE ELECTROBOMBA
SUB ESTACION ALCANTARILLADO SUCASCO
OTROS

COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO


TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=1.5m, L=4.2m
VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M
PUERTA METALICA 0.85*1.80
VENTANA DE ALUMINIO, VIDRIO 10MM
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAMARA DE BOMBEO
CANAL DE INGRESO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
DESARENADOR
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS DESARENADOR

MEDIDOR PARSHALL
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS MEDIDOR PARSHALL
SEDIMENTADOR PRIMARIO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS SEDIMENTADOR 1
FILTRO ANAEROBICO ASCENDENTE FAA
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS

ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60


CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
SUMINISTRO MATERIAL DE FILTRO
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS FILTRO ANAEROBICO
WETLAND SFS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 110 MM; DISTRIBUIDOR CRIBADO,L=41.2m
OTROS
MATERIAL DE AMORTIGUACION
MATERIAL DE ESTRATO
VEGETAL FITODEPURADOR
MANTA DE GEOMEMBRANA
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS WETLAND SFS
CAMARA DE CONTACTO (3m3)
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
ENROCADO DE CIMENTACION
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
SOLADO BASE PARA PTAR E=4"
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS
MURO DE BLOQUETA DE CONCRETO 15 x 40 x 20 cm MEZCLA 1:5
COBERTURA CON CALAMINA GALVANIZADA E=0.3mm (LETRINA ECOLOGICA)
CORREAS DE MADERA DE 2"X2"X10'
VIGA DE MADERA ROLLIZO DE 2"X1.8m

DINTEL DE MADERA ROLLIZO DE 2"X1.8m


PUERTA METALICA 0.85*1.80
VENTANA DE ALUMINIO, VIDRIO 10MM
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAMARA DE CONTACTO
LECHO DE SECADO DE LODOS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
CONCRETO FC=175 KG/CM2
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
SUMINISTRO E INSTALACION DE TUBERIAS
SUM. E INST. TUB PVC UF ISO 4435 DN 200 MM
SUM. E INST. TUB PVC UF ISO 4435 DN 160 MM; DISTRIBUIDOR CRIBADO,L=9M
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
JUNTAS DE WATER STOP e=1 PULG
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
COLOCACION DE FILTROS DE GRAVA
COLOCACION DE FILTROS DE ARENA
COLOCACION DE LADRILLOS CON ARENA
COBERTURA CON CALAMINA GALVANIZADA E=0.22mm, TECHO
TIJERALES METALICOS A36 DE 11/2x11/2x3/32, h=0.8m, L=5.2m
VIGAS METALICOS A36, DE 11/2x11/2x1/8, L=6M
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS LECHO DE SECADO
CAJA DE CONTROL DE VALVULAS
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACIN C/MAQUINARIA EN TERRENO NORMAL
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
OTROS

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1


PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CAJA DE VALVULAS
SEALIZACION
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
ACCESORIOS
COLOCACION DE SEALIZACION
SUMINISTRO DE SEALIZACION
FORESTACION
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
CERCO FORESTAL
EXCAVACION MANUAL DE TERRENO SUELTO
RELLENO Y COMPACTADO CON MATERIALCOMPUS
SEMBRIO DE ARBOLES
CERCO PERIMETRICO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE TERRENO SUELTO
PERFILADO NIVELADO MANUAL DE ZANJA
RELLENO Y COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXEDENTE HASTA D=30M
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
ACERO DE REFUERZO FY= 4,200Kg/cm2 GRADO 60
CONCRETO EN ESTRUCTURAS F'C=210 KG/CM2
MURO DE LADRILLO SOGA E=20cm MEZCLA 1:5 (CEMENTO:ARENA)
OTROS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:1
PINTURA EN MUROS EXTERIORES AL LATEX, IMRIM. TEMPLE
ACCESORIOS
COLOCACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS CERCO
IMPACTO AMBIENTAL
EVALUACION AMBIENTAL
PROGRAMA PARTICIPACION CIUDADANA
PROGRAMA DE MITIGACION, PREVENCION Y CORRECCION
PROGRAMA MANEJO DE RESIDUOS SOLIDOS
PROGRAMA DE MONITOREO AMBIENTAL
PROGRAMA DE CONTINGENCIA Y PRIMEROS AUXILIOS
PROGRAMA DE CIERRE O ABANDONO DE OBRA
MODULO DE CAPACITACION
MODULO DE CAPACITACION EN HABITOS DE HIGIENE
MODULO DE CAPACITACION EN OPERACION Y MANTENIMIENTO DE AGUA POTABLE
MODULO DE CAPACITACION EN OPERACIN Y MANTENIMIENTO DE ALCANTARILLADO
MODULO DE CAPACITACION EN OPERACIN Y MANTENIMIENTO DE PLANTA DE TRATAMIENTO

CAPACITACION EN OPERACIN Y MANTENIMIENTO DE LETRINAS COMPOSTERAS


OTROS
FLETE TERRESTRE
MOV. Y DESMOV. DE MAQUINARIAS PARA OBRAS DE AGUA Y ALCANTARILLADO
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
ALMACEN PARA MATERIALES DE OBRA

BLE Y SANEAMIENTO BASICO URBANO Y RURAL EN EL C. P. SUCASCO, ALMOZANCHE Y LA LOCALIDAD DE COATA

AJA DE REPARTICION

AJA DE REPARTICION

O,L=21.70M

O,L=13M

AJA DE REPARTICION

AJA DE REPARTICION

O,L=33m

O,L=6.3M

AJA DE REPARTICION

AJA DE REPARTICION

O,L=41.2m

A POTABLE
ANTARILLADO
NTA DE TRATAMIENTO

CHE Y LA LOCALIDAD DE COATA, DISTRITO DE COATA, PROVINCIA DE PUNO - PUNO