You are on page 1of 17

PRESUPUESTO VIVIENDA 2 PLANTAS 70 M2

COD.

IMPORTE

RESUMEN

IMPORTE

ALBAILERIA

949,022.06

INST. ELECTRICA

8,105.00

0.00824 $

7,331.60

#REF!

INST. HIDRO-SANITARIA

8,430.00

0.00857 $

7,601.40

#REF!

CARPINTERIA-HERRERIA

3,525.00

0.00358 $

3,172.50

#REF!

PINTURA

9,034.00

0.00919 $

8,130.60

#REF!

CANCELERIA Y VENTANAS

5,283.00

0.00537 $

4,754.70

#REF!

SUBTOTAL (1)

983,399.06

INDIRECTOS/ADMINISTRACION 12.00 %

SUBTOTAL (2)

10

IMSS (7.50 %)

11

TOTAL

983,399.06

12

$/M2 CONSTRUCCION

14,048.56

983,399.06
-

0.96504

#REF!

%
#REF!

1.00000

#REF!

#REF!

0.00000

#REF!

#REF!

1.00000

#REF!

#REF!

0.00000

#REF!

#REF!

1.00000

#REF!

#REF!

#REF!

12

13

14

15

CLAVE

CONCEPTO

UNIDAD

CANTIDAD

PRECIO
UNITARIO

IMPORTE

PRELIMINARES
M

000 COSTO DE TERRENO


LIMPIEZA Y DESPALME DEL TERRENO,
INCLUYE: QUEMA DE YERBAY ACOPIO DE
BASURA, MANO DE OBRA , EQUIPO Y
001 HERRAMIENTA

1196

1700 $

2,033,200.00

TRAZO Y NIVELACION MANUAL PARA


ESTABLECER EJES, BANCO DE NIVEL Y
REFERENCAS INCLUYE: MATERIALES MANO DE
002 OBRA EQUIPO Y HERRAMIENTA

RELLENO CON MATERIAL PRODUCTO DE


EXCAVACION COMPACTADO CON BAILARINA AL
90% PROCTOR ADICIONAL AGUA INCLUYE
003 MANO DE OBRA EQUIPO Y HERRAMIENTA
REGISTRO DE .40X.60X.80 CON UN MURO DE
005 TABIQUE ROJO RECOCIDO

16
17

1206.42 $

13.48

16,262.54

1206.42 $

24.52

29,581.42

1206.42 $

175.47

211,690.52

2.00 $

166.94

333.88

TOTAL PRELIMINARES=

2,291,068.36

PZA.

CIMENTACION

18

EXCAVACION EN MATERIAL TIPO


006 HERRAMIENTA DE MAQUINARIA

19

RELLENO CON MATERIAL PRODUCTO DE


EXCAVACION COMPACTADO CON BAILARINA AL
90% PROCTOR ADICIONAL AGUA INCLUYE
007 MANO DE OBRA EQUIPO Y HERRAMIENTA

20

OBRA: PRESUPUESTO DE OBRA PARA UN EDIFICIO HABITACIONAL DE 4 NIVELES


DURACION:
FECHA: 08/06/2015
LUGAR: HIDALGO DEL PARRAL CHIHUAHUA MX.
FECHA DE INICIO: 19/ENERO/2015
FIN DE OBRA:

10
11

CLIENTE: GERARDO MACIAS MUOZ

1
2
3
4
5
6
7
8

II

CON

COMPACTACION
DEL
FONDO
DE
LA
EXCAVACION POR MEDIOS ANUALES INCLUYE
008 AFINE Y NIVELACION

9.00 $

18.75

168.75

27.00 $

175.47

4,737.69

0.04 $

394.47

14.60

21

22

23

24
25
26

ZAPATA DE CIMENTACION CORRIDA INCLUYE


CIMBRA Y DECIMBRA PLANTILLA DE CNCRETO
5CM 100 KG/CM 60 KG DE ACERO /M FY =
4200 KG/CM CONCRETO FC=200 KG/CM 3/4"
INCLUYE: MANO DE OBRA Y EQUIP Y
009 HERRAMIENTA

ZAPATA AISLADA DE CONCRETO ARMADO


C/ACERO DE REFUERZO DE 1/2" EN AMBOS
SENTIDOS CON CONCRETO Fc 200 Kg/cm
REVENIMIENTO DE 15cm Y PERALTE DE 30cm
INCLUYE MANO DE OBRA Y EQUIPO Y
010 HERRAMINETA
DALA O CADENA DE DESPLATE, INCLUYE
CIMBRA Y DESCIMBRA SECCION = 15X1 CM.
CONCRETO FC=150 KG/CM 34" INCLYE: MANO
011 DE OBRA, EQUIPO Y HERRAMINETA

FIMRE DE CONCRETO HABITACIONAL CON


C/7cm ESPESOR Y MALLA ELECTROSOLDAD
CON REVENDIMIENTO 14 cm @30CM INCLYE
012 MANO DE OBRA Y EQUIPO Y HERRAMINTA

9.02 $

532.79

4,804.70

13.20 $

952.69

12,575.51

9.02 $

328.99

2,966.83

1207.08 $

153.09

184,791.88

TOTAL DE CIMENTACION =

210,059.95

ML

ESTRCTURA METALICA

27

ESTRUCTURA DE ACERO INCLYE: GRUA MANO


013 DE OBRA Y EQUIPO Y HERRAMIENTA

PZA.

308.00 $

6,385.37

1,966,693.96

28

LOSACERO INCLYUE MANO DE OBRA EQUIPO Y


014 HERRAMIENTA

LOTE

301.77 $

887.69

267,878.21

29

PANEL DE CONCRETO DUROCK


DE 1/2"
INCLUYE MANO DE OBRA , EQUIPO Y
015 HERRRAMIENTA

385.44 $

284.00

109,464.96

952.21 $

218.73

208,276.89

TOTAL ESTRUCTURA METALICA=

2,552,314.02

234,388.22

30

BLOCK DE 6" CONCRETO CURADO AL VAPOR


U/MORTERO MEZCLA ARENA-CEMENTO 1:4,
CON ESPESOR 1cm INCLUYE: MANO DE OBRA ,
016 EQUIPO Y HERRAMIENTA

31
32
33

CUBIERTA
LOSA ALIGERADA
15 cm DE PELARTE Y
REFUERZO Fy 4200 kg/cm Y CONCRETO Fc
017 200 kg/cm ALIGERADA CON CASETONE

M
367.00 $

638.66

A
34

35

IMPERMIABILIZATE EN AZOTEA CON ASFALTO


018 OXIDADO
BASE PARA TINACOS DE 1000 LTS CON BLOCK
DE CONCRETO 15X20X40 JUNTEADO CON
MORTERO HIDRADULICO ARENA 1:5 INCLUYE
APLANADOS MANO DE OBRA Y EQUIPO Y
019 HERRAMIENTA

E
367.00 $

55.18

20,251.06

4.00 $

975.83

3,903.32

TOTAL CUBIERTA=

24,154.38

55.83

53,161.88

TOTAL APLANADOS EXTERIORES =

53,161.88

PZA.

36
37
38

APLANADOS EXTERIORES
AFINE SOBRE MURO Y CIELO CON MORTERO
ARENA-CEMENTO 1:3 FLOTEADO CON 1CM DE
020 ESPESOR

M
952.21 $

39
40

OBRA INTERIOR
ESCALERA DE CONCRETO DE 4M DE LARGO X
2.5 DE ANCHO, INCLUYE FORJADO DE
ESCALONES CON TABIQUE COMUN,
CONCRETO Y FORRADA DE PISO CERAMICO.

41

ML

021
MURO DE TABLAROCA PANEL DE YESO DE
1/2" CON UNA BASTIDOR DE MADERA DE
FAJILLA DE 1X2 CEPILLADO Y ANCLADA CON
FULMINANTES DE 1"1/2 A FIRME Y PIJAS DE
MADERA CHIRRAQUERAS 1" INCLUYE
DESPERDICIO, ADEMAS DE RESANE
C/PERFACINTA Y READY MIX INCLUYE: MANO
DE OBRA, EQUIPO Y HERRAMIENTA

MURO DE AZULEJO KALEIDO RECTIFICADO DE


30 X60 cm ASENTADO CON MORTERO
CEMENTO- ARENA 1:4 INCLUYE : MANO DE
OBRA , EQUIPO Y HERRAMINETA.

PISO DE MARMOL ESCIFER DE 1.20X1.20 cm


ASENTADO CON MORTERO CEMENTO- ARENA
1:4 INCLUYE : MANO DE OBRA , EQUIPO Y
024 HERRAMINETA.

PISO DE AZULEJO CLABRIA DE .60X.60 cm


ASENTADO CON MORTERO CEMENTO- ARENA
1:4 INCLUYE : MANO DE OBRA , EQUIPO Y
025 HERRAMINETA.

026 COLOCACION DE PLAFON

42

022

43
023

44

45
46

195.00 $

2,536.00

494,520.00

385.44 $

163.73

63,108.09

108.66 $

264.06

28,692.76

151.30 $

1,283.96

194,263.15

647.88 $

534.96

346,589.88

824.98 $

298.22

246,025.54

47
48
49

50

BANQUETA DE CONCRETO SIMPLE DE 10cm DE


ESPESOR CONCRETO HECHO EN OBRA FC
=150 kg/cm AGREGADO MAXIMO 1"1/2 "
ACABADO ESCOBILLADO INCLUYE MANO DE
027 OBRA, EQUIPO Y HERRAMIENTA
FORJADO DE REGISTRO SANITARIO Y EL
COLECTOR PRINCIPAL, .40x.80 MT.INCLUYE
EXCAVACION, MURETES DE BLOC, RELLENO
028 PERIMETRAL, TAPAS Y LIMPIEZA

125.22

55

60
61
62

1,221.11

152,907.39

10.00 $

166.94

1,669.40

TOTAL DE BANQUETA Y RESGISTRO =

154,576.79

RAMELEO DE HIDROSANITARIA Y GAS

54

59

PZA.

TINACOS DE 1100 LT INCLYE MANO DE OBRA


030 EQUIPO Y HERRAMINETA

58

1,373,199.42

INSTALACIONES HIDRAULICA RAMELEO CON


TUBERIAS Y PIEZAS DE FO.GA. DE COBRE TIPO
M SOLDABLE DE 13mm DE DIAM. TUBO DE PVC
SANITARIO, INCLUYE: SUMINISTROS E
029 INSTALCION
ML

57

BANQUETAS Y REGISTROS

53

56

TOTAL DE OBRA INTERIOR=

51
52

534.60 $

59.30

31,701.78

PZA.

4.00 $

2,740.00

10,960.00

CIRTERNA DE 10,000 LT , ELECTROBOMBA


WEJENCLUYE MANO DE OBRA EQUIPO Y
031 HERRAMINETA

PZA.

3.00 $

25,508.75

76,526.25

032 INSTALACIONES SANITARIAS DE TUBO DE 4"

ML

654.52 $

41.78

27,345.85

033 INSTALACIONES SANITARIAS DE TUBO DE 2"

ML

47.50 $

24.96

1,185.60

COLOCACION DE MUEBLE SANTARIO W.C. Y


ACCESORIOS INCLUYE MANO DE OBRA Y
034 EQUIPO Y HERRAMIENTA

PZA.

18.00 $

5,270.00

94,860.00

COLOCACION DE MUEBLE SANTARIO LAVAVO Y


ACCESORIOS INCLUYE MANO DE OBRA Y
035 EQUIPO Y HERRAMIENTA
PZA.

18.00 $

2,855.00

51,390.00

6.00 $

7,520.00

45,120.00

6.00 $

12,320.00

73,920.00

TOTAL DE HIDROSANTARIA Y GAS =

266,475.60

COLOCACION DE MUEBLE SANTARIO DE


CABINA Y ACCESORIOS INCLUYE MANO DE
036 OBRA Y EQUIPO Y HERRAMIENTA

PZA.

COLOCACION DE MUEBLE SANTARIO DE TINA Y


ACCESORIOS INCLUYE MANO DE OBRA Y
037 EQUIPO Y HERRAMIENTA
PZA.

63
64

C
D
E
PINTURA EN EXTERIORES Y INTERIORES

SUMINISTRO Y APLICACIN DE PINTURA


VINILICA COMEX SOBRE MURO INCLUYE UNA
MANO EN SELLADOR Y DOS MANOS DE
038 PINTURA

65

1337.65 $

75.55

101,059.46

TOTAL DE PINTURA EXTERIOR Y INTERIOR=

101,059.46

INSTALACION ELECTRICA

66
67

INSTALACION ELECTRICA PREPARACION DE


039 POLIDUCTO DE 3/4" Y SUMINISTRO

ML

2002.15 $

218.72

437,910.25

68
69

040 INSTALACION ELECTRICA CABLEADO

ML

2002.15 $

164.55

329,453.78

041 INSTALACION DE LAMPARA DE CIELO

PZA.

104.00 $

2,244.00

233,376.00

70

INSTALACION DE TOMA CORRIENTE Y


042 APAGADOR SENCILLO

PZA.

306.00 $

2,244.00

686,664.00

71

INSTALACION DE CENTRO DE CARGA


043 INTERIOR

PZA.

8.00 $

567.56

4,540.48

046 INSTALACION DE CAJAS DE CARGA EXTERIOR

PZA.

8.00 $

781.56

6,252.48

73
74
75
76
77
78

047 SUMINISTRO DE BASE DE MEDIDOR

PZA.

9.00 $

625.31

5,627.79

048 INSTALACION DE SPOT

PZA.

228.00 $

723.00

164,844.00

049 ELEVADOR

PZA.

1.00 $

270,506.06

270,506.06

050 PLANTA DE LUZ

HRS

296.50 $

706.43

209,456.50

TOTAL INTALCION ELECTRICA=

2,348,631.34

79

VENTANA DE ALUMINIOO ANODIZADO NATURAL


051 DE 1.20x1.20MT
PZA.

66.00

1,119.65

73,896.90

80

VENTANA DE ALUMINIOO ANODIZADO NATURAL


052 DE .60x.60MT
PZA.

12.00 $

999.65

11,995.80

81

VIDRIO TEMPALDO INCLUYE MANO DE OBRA,


053 EQUIPO Y HERRAMIENTA.

2,112.17

753,727.86

TOTAL DE HERRERIA=

839,620.56

72

HERRERIA

82
83

CARPINTERIA
PUERTA DE TAMBOR CON TRIPLAY DE CAOBA
3mm EN .80x2.10 m INCLYE MANO DE OBRA ,
054 EQUIPO Y HERRAMIENTA

PZA.

85

PUERTA METALICA CON VIDRIO TRASLUCIDO


055 1/2"

PZA.

86
87
88
89

056 ZOCLO DE MADERA 1/2"x 4"

ML

84

356.85

30.00 $

1,662.85

49,885.50

10.00 $

6,230.56

62,305.60

1268.70 $

56.69

71,922.60

TOTAL DE CARPINTERIA= $

184,113.70

JARDINERIA
057 SESPED NATURAL

321.25 $

148.55

47,721.69

A
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

TOTAL DE JARDINERIA=

F
$

47,721.69

COSTOS INDIRECTOS
058 REALIZACION DE ANTEPROYECTO

JOR

2.00 $

466.66

933.32

059 ELABORACION DE PLANTAS

JOR

8.00 $

1,799.98

14,399.84

060 CALCULO ESTRUCTURAL

JOR

8.00 $

2,666.64

21,333.12

061 COSTOS PRESUPUESTO

JOR

8.00 $

2,399.98

19,199.84

062 INSTALACIONES

JOR

8.00 $

2,666.64

21,333.12

063 RENDERS

JOR

8.00 $

2,666.64

21,333.12

TOTAL DE COSTOS INDIRECTOS=

98,532.36

SUBTOTAL

10,544,689.52

UTILIDAD % 9%

949,022.06

GASTOS EMPRESA 4%

421,787.58

OTROS 1%

105,446.90

TOTAL

12,020,946.05

INFONAVIT-70
28-Feb-02
INSTALACION ELECTRICA

CLAVE

ESPECIFICACION ORIGINAL

UNIDAD

CANTIDAD

PRECIO UNITARIO

IMPORTE

SALIDA ELECTRICA PARA CONTACTO,


ALUMBRADO, TIMBRE ETC. CON POLIDUCTO
NARANJA, CABLE CONELEC O SIMILAR
001 CALIBRES 12 Y 14
SAL.

21.00

SALIDA PARA CONTACTOS 220 V.. CON


002 POLIDUCTO NARANJA, CON CABLEADO
SAL.

0.00

195

SALIDA PARA CONTACTOS 220 V.. CON


003 POLIDUCTO NARANJA, SIN CABLEADO
SAL.

3.00

100

300

SALIDA ELECTRICA PARA VENTILADOR, TV,


TELEFONO , CON POLIDUCTO NARANJA,
CABLE CONELEC O SIMILAR CALIBRES 14 Y
004 HERRAJES DE SOPORTERIA.
SAL.

4.00

100

400

005 ACOMETIDA BIFASICA COMPLETA

PZA.

1.00

2500

2500

006 ALIMENTACION GENERAL CON CABLE 8

ML

25.00

37

925

CENTRO
DE
CARGA
QO8
CON
3
INTERRUPTORES TERMOMAGNETICOS DE
007 15-20 AMS.
PZA.

1.00

650

650

SUMINISTRO
E
INSTALACION
DE
CONTACTOS, APAGADORES, CONECTORES
TV Y TELEFONO ETC. MARCA LUMINEX
008 LINEA ECONOMICA.
PZA.

27.00

30

810

120.00

2,520.00

% PRESUP.
TOTAL

31.092% $

0.000% $

3.701% $

VARIANTE
FACTIBLE

2,268.00

287.10

4.935% $

380.00

30.845% $

2,250.00

11.413% $

832.50

8.020% $

585.00

9.994% $

729.00

CANTIDAD

PRECIO UNITARIO

IMPORTE

% PRESUP. TOTAL

VARIANTE
FACTIBLE

INFONAVIT-70
28-Feb-02
INSTALACION HIDROSANITARIA

1
2
3
4
CLAVE

ESPECIFICACION ORIGINAL

UNIDAD

SALIDA HIDROSANITARIA PARA WC, LAVABO, REGADERA,


FREGADERO, VERTEDERO, LAVADERO ETC. CON TUBERIA DE P.V.C.
001 DE 2" Y 4" Y ALIMENTACION CON TUBERIA DE COBRE DE 1/2" Y 3/4"
SAL.

14.00 $

100.00

1,400.00

16.607% $

1,260.00

SUMINISTRO E INSTALACION DE TINACO ROTOPLAST DE 700 LTS


INCLUYE VALVULA DE LLENADO Y JUEGO DE VALVULAS PARA BY
002 PASS
PZA.

1.00 $

1,150.00

1,150.00

13.642% $

1,035.00

003 SALIDA DE GAS PARA CALENTADOR, ESTUFA Y SECADORA

SAL.

2.00 $

100.00

200.00

2.372% $

191.40

004 SUMINISTRO E INSTALACION DE LLAVE DE JARDIN

PZA.

2.00 $

30.00

60.00

0.712% $

57.00

SUMINISTRO Y TENDIDO DE TUBERIA DE PVC. DE 4" PARA


005 DRENAJE, BAJANTES PLUVIALES Y DE AGUAS NEGRAS.
ML

42.00 $

22.00

924.00

10.961% $

831.60

006 SUMINISTRO Y TENDIDO DE TUBERIA DE PVC. DE 2" PARA DRENAJE ML

30.00 $

22.00

660.00

7.829% $

594.00

12

ALIMENTACION DE AGUA FRIA Y CALIENTE CON TUBERIA DE COBRE


007 DE 1/2" , 3/4 Y 1""
ML

65.00 $

22.00

1,430.00

16.963% $

1,287.00

13

TANQUES PARA GAS ESTACIONARIO, INCLUYE CONEXIONES Y


008 TUBERAS.
PZA.

14
15

009 ALIMENTACION DE GAS CON TUBERIA DE COBRE FLEXIBLE

ML

010 SUMINISTRO E INSTALACION DE REGADERA RUGO MODELO H600

7
8
9
10
11

0.00 $

2,500.00

12.00 $

22.00

264.00

3.132% $

237.60

PZA.

1.00 $

67.00

67.00

0.795% $

60.30

16

SUMINISTRO Y COLOCACION DE COLADERA DE BAO CROMADA


011 MARCA RUGO
PZA.

1.00 $

75.00

75.00

0.890% $

67.50

17

012 MUEBLES DE BAO T-1 MCA. LAMOSA LIBERTY GAMUZA

2.00 $

650.00

1,300.00

15.421% $

1,170.00

PAQ.

0.000% $

INFONAVIT-70
28-Feb-02
CARPINTERIA-HERRERIA

CLAVE

ESPECIFICACION ORIGINAL

UNIDAD

PRECIO
UNITARIO

CANTIDAD

SUMINISTRO Y COLOCACION DE PUERTA SOLIDA DE TABLERO


VALSAPANEL EN ACCESO PRINCIPAL.INCLUYE FIJOS, HERRAJES
001 Y CERRADURA.

PZA.

1.00

750.00

SUMINISTRO Y COLOCACION DE PUERTA DE TAMBOR CAOBILLA


002 INTERIORES. INCLUYE HERRAJES Y CERRADURA.

PZA.

5.00

450.00

SUMINISTRO Y COLOCACION DE CLOSET EN RECAMARAS,


003 INCLUYE DIVISIONES Y TUBO COLGADOR

PZA.

0.00 $

3,500.00

004 SUMINISTRO E INSTALACION DE COCINA INTEGRAL

PZA.

0.00 $

4,500.00

005 PUERTA METALICA SALIDA COCINA A PATIO SERV.

PZA.

1.00

TOTAL

525.00

% PRESUP.
TOTAL

IMPORTE

750.00

2,250.00

$
$

525.00

3,525.00

21.277%

VARIANTE
FACTIBLE

675.00

63.830% $

2,025.00

0.000%

0.000%

14.894%

472.50

100.000% $

3,172.50

INFONAVIT-70
28-Feb-02

PINTURA

CLAVE

ESPECIFICACION ORIGINAL

UNIDAD

CANTIDAD

PRECIO
UNITARIO

001

SUMINISTRO Y APLICACIN DE PINTURA VINILICA EN LOSAS

M2

20.00

25.00

002

SUMINISTRO Y APLICACIN DE PINTURA VINILICA EN MUROS


INTERIORES

M2

198.00

25.00

003

SUMINISTRO Y APLICACIN DE PINTURA VINILICA ESTOPEADA


EN MUROS INTERIORES

M2

0.00

85.00

004

SUMINISTRO Y APLICACIN DE PINTURA VINILICA EN MUROS


EXTERIORES

M2

128.00

28.00

TOTAL
SOLO SE APLICA PINTURA EN LOSAS Y MUROS DE BAOS Y
COCINA EN INTERIORES. EL RESTO DE MUROS Y LOSAS,
QUEDAN CON ACABADO DE YESO.

% PRESUP. VARIANTE
TOTAL
FACTIBLE

IMPORTE
$

500.00

4,950.00

3,584.00

9,034.00

5.535%

450.00

54.793% $

4,455.00

0.000%

39.672% $

3,225.60

100.000% $ 8,130.60

INFONAVIT-70
28-Feb-02
CANCELERIA Y VENTANAS

CLAVE

ESPECIFICACION ORIGINAL

001

VENTANA VA-X0DE ALUMINIO ANODIZADO


DUROVAL G-2 Y CRYSTAL FILTRASOL DE
3MM DIMENSIONES DE 1.50X1.20 M CON ,
PERFIL 1 1/2"".

UNIDAD

CANTIDAD

PRECIO UNITARIO

IMPORTE

PZA.

0.00

532.00

PZA.

5.00

486.00

2,430.00

PZA.

3.00

437.00

1,311.00

PZA.

2.00

321.00

642.00

PUERTA CANCEL DE BAO CON ALUMINIO


ANODIZADO
DURANODIC
Y ACRILICO
009 OPALINO DE 1.83 X 2.00 M.
PZA.

1.00

900.00

900.00

5,283.00

001

004

006

VENTANA VA-X0DE ALUMINIO ANODIZADO


DUROVAL G-2 Y CRYSTAL FILTRASOL DE
3MM DIMENSIONES DE 1.20X1.20 M , PERFIL
1 1/2"".
VENTANA VA-X0DE ALUMINIO ANODIZADO
DUROVAL G-2 Y CRYSTAL FILTRASOL DE
3MM DIMENSIONES DE 0.90X1.20 M , PERFIL
1 1/2"".
VENTANA VA-X0DE ALUMINIO ANODIZADO
DUROVAL G-2 Y CRYSTAL FILTRASOL DE
3MM DIMENSIONES DE 0.60X0.60 M , PERFIL
1 1/2"".

TOTAL

% PRESUP. TOTAL

0.000% $

VARIANTE
FACTIBLE

45.997% $

2,187.00

24.815% $

1,179.90

12.152% $

577.80

17.036% $

810.00

100.000% $

4,754.70

PRESUPUESTO
PAGO CONTADO

ING. ENRIQUE SILVA ROMO


2139078

No.
MATERIAL
INST. ELECTRICA

CANTIDAD

001 CABLE CAL. 1/0

UNIDAD

TOTAL

0.00

18.50

002 CABLE CAL. 4

30.00

7.50

258.75

003 CABLE CAL. 8

14.00

ROLLO

360.00

5,796.00

004 CABLE CAL. 10

24.00

ROLLO

172.00

4,747.20

005 CABLE CAL. 12

26.00

ROLLO

112.00

3,348.80

006 CABLE CAL. 14

18.00

ROLLO

86.00

1,780.20

007 CENTRO DE CARGA QO-12

6.00

PZA

462.00

3,187.80

ACOMETIDA C.F.E.-220V
INCLUYE 05 BASES SOCKET
008 CON 5a. TERM.

1.00

LOTE

1,025.00

1,178.75

INTERRUPTOR DE SEG.2X70
009 TERMOMAGNETICO INC.
PASTILLA
010 CONT. DOBLE MODUS

6.00

PZA

850.00

5,865.00

100.00

PZA

18.50

2,127.50

66.00

PZA

18.60

1,411.74

6.00

PZA

24.00

165.60

200.00

PZA

5.00

1,150.00

014 POLIDUCTO 1/2"

16.00

ROLLO

96.00

1,766.40

015 POLIDUCTO 3/4"

8.00

ROLLO

150.00

1,380.00

016 CINTA AISLANTE

10.00

PZA

28.00

322.00

017 INT. TERMOMAG. 1X20-A

20.00

PZA

37.00

851.00

018 INT. TERMOMAG. 2X20-A

24.00

PZA

124.00

3,422.40

019 DUCTO CUADRADO 3"

1.00

PZA

136.00

156.40

020 BOTE UNIVERSAL

4.00

PZA

11.00

50.60

021 CONO P/SPOT

4.00

PZA

33.00

151.80

022 CONDULETS Y HERRAJES

6.00

LOTE

172.00

1,186.80

023 TUBERIA PVC 3/4"

3.00

TRAMO

13.00

44.85

40,349.59

011 APAG. SENCILLO MODUS


012 TIMBRE
013 CHALUPAS Y CAJAS

TOTAL

Confidencial

P.U.

02/08/2016

Pgina 17

You might also like