You are on page 1of 1

0.

90
0.25

0.90

0.20

SPCD 10@ 50,10@100


REST @ 180

0.25

SPCD 10@ 50,10@100


REST @ 180

0.90

0.90

0.25

0.90

0.90

0.20

0.25

SPCD 10@ 50,10@100


REST @ 180

NGL

SPCD 10@ 50,10@100


REST @ 180

0.80
0.25

PAYLINE EXCAVATION
0.25

3.10

0.75

1.00

0.80
0.25

0.40

SPCD 10@ 50,10@100


REST @ 180

PAYLINE EXCAVATION

PAYLINE EXCAVATION

3.50

SPCD 10@ 50,10@100


REST @ 180

100mm THICK GRAVEL BED

100mm THICK GRAVEL BED

100mm THICK GRAVEL BED

F2-C1

F1 - C1

WF-2
F1-C1

WF-2

N T S

N T S

2.45

N T S

PROPOSED NEW
DRYWALL PARTITION

F3 - C2

F2 - C1

BAR @ 600mm O.C.

WF-2

FULLY COMPACTED FILL


NGL

EXISTING CONC. SLAB

NOTE:

100mm THICK GRAVEL BASE

ALL REBARS CONNECTING TO EXISTING

NGL

PAYLINE EXCAVATION
0.50

3.50

F1-C1

13.95

RESTING ON COMPACTED FILL

100mm THICK GRAVEL BASE


0.10 0.10

100mm THK. SLAB ON A 100mm THK.


FULLY COMPACTED GRAVEL BED w/

BAR @ 600mm O.C.

STRUCTURE SHALL BE ANCHORED AND


APPLIED WITH HIT-RE 500 INJECTION

PAYLINE EXCAVATION

0.50

WF-2

3.50

F1-C1

FOR DEMOLITION

100mm THICK REINF. CONCRETE

VARIES 0.10 0.10

WF-1

ADHESIVE WITH A MIN. EMBEDMENT DEPTH


OF 0.20M AND A HOLE DIAMETER OF 1.20
TIMES OF REBAR DIA.

100mm THICK GRAVEL BEDDING

F1-C1

WF-2
F1-C1

WF-2 DETAIL

WF-2
F2-C1
WF-2

3.00

1.10
1.10

2.20

WF-1

0.30

WF-1 DETAIL

F1-C1

WF-2

100mm THICK GRAVEL BEDDING

0.30

4.50

WF-2

SPCD @ 300mm O.C.

0.10 0.15

0.15

SPCD @ 300mm O.C.

FOOTING
DESIGNATION

FOOTING SIZE

BOTTOM REBARS

EXCAVATION DEPTH
COVER

3.50
F3-C2

X-DIR. (mm)

Y-DIR. (mm)

THICK (mm)

F1

900

900

250

100mm

1.05

ISOLATED FOOTING

1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE SPECIFIED.

F2

900

900

250

100mm

1.05

ISOLATED FOOTING

2. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL DIMENSIONS PRIOR TO

F3

900

900

250

100mm

1.05

ISOLATED FOOTING

F3-C2
CANOPY ROOF LINE

F1-C1

X-DIR. (mm)

REMARKS

( METERS)

Y-DIR. (mm)

COMMENCING WORK AND FOR NOTIFYING THE CONTRACTING OFFICER OF ANY


CONFLICTING OR ERRONEOUS INFORMATION.

0.80

3. SHOULD BOULDERS BE ENCOUNTERED DURING EXCAVATION, REMOVE THE BOULDERS

SCHEDULE OF FOOTINGS

2.20

1.20 0.50

AND LEVEL OFF WITH 13.8 MPa (fc'= 2,000 psi) CONCRETE.
4. NO FOOTING SHALL REST ON FILL. FOOTINGS FOR C.H.B. WALLS AND OTHER MINOR STRUCTURES

2.50

FOUNDATION PLAN
SCALE

SHALL BE EMBEDDED AT LEAST 600mm FROM ACTUAL GROUND LEVEL UNLESS OTHERWISE NOTED IN THE PLAN.

COLUMN
DESIGNATION

LEVEL

C-1

GROUND FLOOR ROOF BEAM

250 X 250

GROUND FLOOR ROOF BEAM

200 X 200

SECTION (b x h) mm

MAIN REBARS
mm

LATERAL TIES

5. ALL FOOTINGS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF 143.70 KPa (3,000 psf).
CONTRACTOR SHALL REPORT IN WRITING TO THE CONTRACTING OFFICER ACTUAL SOIL CONDITIONS

1 : 100 M

C-2

UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE DEPOSITING CONCRETE.

REST @ 180mm O.C.

6. CONCRETE STRENGTH SHALL NOT BE LOWER THAN 3000 psi UNLESS OTHERWISE SPECIFIED.
7. BENDS, SPLICES AND HOOKS SHALL CONFORMED WITH THE LATEST PROCEDURE OF THE ACI CODE.

REST @ 200mm O.C.

SCHEDULE OF RC COLUMNS
CONTENTS:

NE

TI

PH I L I PP I

L GR I
ONA
D

E
TH

PROJECT TITLE
RA T I ON O
PO
F
OR

N
NGC P

NGCP

SUBMITTED BY:

SR. ENGINEER, OPD

EXPANSION OF OPD OFFICE

VISAYAS OPERATION & MAINTENANCE


VISAYAS POWER CENTER,
NASIPIT, TALAMBAN, CEBU CITY 6000, PHILIPPINES
TEL/FAX NO. 236 9703

NORBIE T. DEGUMA

FOUNDATION PLAN AND


DETAILS

OPERATIONS PROJECT DIVISION

APPROVED BY:

DIVISION HEAD II-A, O P D

JOSE G. LARIOSA

LOCATION:
VPC, NASIPIT, TALAMBAN, CEBU CITY

NARCISO O. BANTUG

RECOMMENDED BY:

REV.NO.

DATE

NATURE OF REV.

BY

DESIGN

CHECKED

RECORDED

APPROVED

OIC SECTION HEAD, PDE, OPD

DRAWN BY:

SHEET NO.

This drawing and all information


therein is the property of the
National Grid Corporation of the
Philippines and may not be copied or
duplicated in any way without prior
authorization or approval by NGCP.