SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

ww

w.

NA
I

RA

AN

.co

http://www.NairaMan.com
+2348065008899

Page 1

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

THIS IS AN ABRIDGED VERSION OF THE FULL VERSION


OF THIS PLAN. YOU WILL ALWAYS SEE THE CAPTION
******SOME TEXT MISSING******
THEREIN BECAUSE I DELIBRATELY DELETED THOSE
TEXT JUST TO SHOW YOU PART OF THE START-UP
PLAN.

THE FULL-VERSION IS WELL DETAILED AND IS

.co

APPROXIMATELY 4,000 WORDS LONG. IT ALSO

AN

CONTAINS THE CONTACT OF THE SACHET MACHINE

FABRICATOR AND THE POLYETHYLENE

RA

MANUFACTURER/PRINTER.

NA
I

THIS ABRIDGED VERSION WHICH IS ONLY ABOUT 1400

w.

WORDS LONG IS ONLY A TIP OF THE ICEBERG.

ww

MY INTENTION IS TO SHOW YOU PART OF THE


DOCUMENT IN ORDER TO CLEAR ALL DOUBTS.

THE FULL VERSION OF THIS START-UP PLAN IS


AVAILABLE AT A PRICE.

CALL +2348065008899 to order.

http://www.NairaMan.com
+2348065008899

Page 2

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

NAFDAC GUIDELINES
Below are some of the NAFDAC Guidelines you will find in the report:

******SOME TEXT MISSING******


...A successful application attracts a Certificate of Registration with a validity period of 5 (five) years
whereas products with Listing status has a validity of 2 (two) years...

... payments to the Agency should be in Bank Draft payable to National Agency for Food and Drug
Administration and Control (NAFDAC).
Water in sachet Thirty thousand naira (N30, 000:00) + 5% VAT.

Water in bottle Fifty thousand naira (N50, 000:00) + 5% VAT...

.co

ww

w.

NA
I

RA

AN

******SOME TEXT MISSING******

http://www.NairaMan.com
+2348065008899

Page 3

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

REQUIREMENTS FOR THE BUSINESS


Registration of business with Corporate Affairs Commission (CAC)
Registration with NAFDAC
Accommodation: NAFDAC recommends that the factory must not be residential nor
share compound with residential ones. Floor of production room and store must be
tiles; pallets must be on the floor of the store.
Two Dyna Trucks
Good Bore hole well

Nylon sachets

.co

Sacheting machine
7.5 KVA Generating set

AN

Other Consumables

RA

These requirements are detailed later on in this report.

ww

w.

NA
I

******SOME TEXT MISSING******

http://www.NairaMan.com
+2348065008899

Page 4

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

HUMAN RESOURCES FOR THE BUSINESS


1. Production Manager: This ideal candidate must be well experienced and qualified.
A degree holder in related fields such as microbiology, food and drinks, e.t.c.
Especially someone who has previously worked with a sachet water company.
2. Administrative Manager: Who must be experienced and qualified in administration
of business. You can fit in here with the help of the Production Manager.
3. Machine operators
4. Parkers/Loaders/Supervisors

5. Cleaners

AN

.co

6. Drivers

RA

CHALLENGES OF THIS BUSINESS


1. Meeting the NAFDAC requirements. NAFDAC is the main regulatory agency you

NA
I

must meet its requirement before and after your products are approved.
2. Generating effective marketing strategies that would transform into money.

w.

3. During the rainy season, demand for pure water may drop drastically.
4. How to get responsible, honest and reliable workers.

ww

5. Since generating constant power is a problem in Nigeria, you have to plan your
business on generating set.

http://www.NairaMan.com
+2348065008899

Page 5

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

FACTORY BUILDING PLAN


The building to be used has been specified by the regulatory agency NAFDAC as follows:
The building must be spacious, with many rooms. It must not be close to a cemetery, abattoir, petrol
station, refuse dump, sewage system, saw mill, or any source of pollution.

The building compound shall be strictly used for the water production only and shall not
share compound with any residence.
Every building to be used must be approved before commencement of production. The building must
make provision for:
1. Water Sacheting Machine room.

2. Cloak room.

.co

3. Packaging materials room.


4. Finished product room

AN

5. Offices.

ww

w.

NA
I

RA

******SOME TEXT MISSING******

http://www.NairaMan.com
+2348065008899

Page 6

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

FACTORY OPERATING PLAN


A typical sachet-water factory setting consists of a storage system (tanks), a conveyance
system (piping), a decentralized water treatment system (filters, UV disinfection units), and a
packaging system. The sachet water production follows this same order. The packaging is
done by making use of automatic liquid filling and packaging machines, also commercially
know as automatic liquid packaging machines, form, fill and seal machines, form, fill,
seal, vertical (flow) sachet machines or simply sachet machines.

ww

w.

NA
I

RA

AN

.co

******SOME TEXT MISSING******

Typical sachet-water factory set-up (Water Sacheting Room)

Filter

http://www.NairaMan.com
+2348065008899

Page 7

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

The filters used for the factories that were surveyed included yarn (strung wound) filters,
granular carbon filters, and fiber matrix carbon filters. The filter cartridges and housings

AN

.co

come in two sizes, 20 and 10 sizes, which corresponded to the filter lengths.

CarbonFilter

w.

NA
I

RA

SandFilter

WaterPump

ww

Figure A: Sand and carbon filters.


Filter media in cylinders

http://www.NairaMan.com
+2348065008899

Page 8

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

AN

.co

RA

Figure B: Series of yarn, fiber, granular carbon and carbon matrix filters.

ww

w.

NA
I

Arrow shows flow direction

Yarn filter
cartridge(used)

Fibre filter
cartridge(used)

Matrix carbon filter


cartridge (used)

Figure C

http://www.NairaMan.com
+2348065008899

Page 9

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

ww

w.

NA
I

RA

AN

.co

******SOME TEXT MISSING******

Figure D: Loading of polythene rolls in sachet machine

http://www.NairaMan.com
+2348065008899

Page 10

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

w.

NA
I

RA

AN

.co

ww

Figure E: Polythene rolls adjusted by folding on base board of bag former

http://www.NairaMan.com
+2348065008899

Page 11

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

ww

w.

NA
I

RA

AN

.co

Heat sealing plates


Longitudinal Sealing

Heat sealing plates


Transverse Sealing

Figure F: 0.5m of sachet rolls sealed longitudinally and at one end

http://www.NairaMan.com
+2348065008899

Page 12

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

ww

w.

NA
I

RA

AN

.co

Figure G: Final adjustment of roll and trimming below seal

http://www.NairaMan.com
+2348065008899

Page 13

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

NA
I

RA

AN

.co

UV bulb used to
disinfect polythene
roll

ww

w.

Figure H: UV-bulb in sachet machine used to disinfect polythene roll

http://www.NairaMan.com
+2348065008899

Page 14

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

w.

NA
I

RA

AN

.co

ww

Figure I: Automatic Counter(Indicated by Red Circle)

Figure J: Automatic Counter (Shown blown up)

http://www.NairaMan.com
+2348065008899

Page 15

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

Table Of Approximate Capital Cost Required For Sachet Water Factory

******SOME TABLE VALUES MISSING******


Item

Unit

No.

Sachet Filling and Packaging

Unit Cost

Approximate

Cost

(Naira)

Quantity

(Naira)

500,000

500,000

ww

w.

NA
I

RA

AN

.co

Machine

GRAND TOTAL

http://www.NairaMan.com
+2348065008899

1,174,180

Page 16

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

Operation and Maintenance Costs

******SOME TABLE VALUES MISSING******


Item

Units Per Time

Unit Cost

Approximate

Cost

(Naira)

Quantity

(Naira)

Electricity
Litres per day

2,340

30

70,200

ww

w.

NA
I

RA

AN

.co

Fuel

Total Costs Per Month

http://www.NairaMan.com
+2348065008899

696,730.83

Page 17

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

Computation of cost of printing polythene bags used in sachet-water production


One roll of polythene weighs 13.8kg, including 1kg of an inner support the polythene is
rolled on. The weight of the polythene alone is thus 12.8 kg. The cost of printing 2 colours on
the polythene is approximately

******SOME TEXT

MISSING******
.

One roll of polythene (12.8kg polythene) is able to produce *** bags of sachets, with 20

.co

individual sachets per bag. This is therefore equivalent to *** individual sachets per kg.

The equivalent cost a printed polythene bag for one individual sachet is thus N *** per

AN

individual sachet.

RA

These bags may be printed outside the State, so additional costs for transportation may apply.

Since the sachets were packaged in bigger bags of 20 individual sachets, the cost of the

NA
I

bigger bag is factored into the N *** for individual printed bags calculated above. The
packaging bags cost N *** per 100 bags. This amounted to N *** per bag, and is equivalent

w.

to N *** per individual sachet. Hence, the total packaging cost per individual sachet was thus

ww

calculated as N ***. The total amount required per month for packaging material is therefore
N *** for the production of *** sachets per month (*** individual sachets per day).

Sachet-water Quantities Produced

http://www.NairaMan.com
+2348065008899

Page 18

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

The number of sachets produced by factory should vary from approximately *** sachets per
day (*** litres/day) during the rainy and cold seasons to approximately twice as much (***
sachets or *** litres/day) during the dry and hot seasons. The quantities is summarised in the
table below:

Quantity of sachet water produced per day by sachet-water factories


Description

Rainy Season

Dry Season

Production per day


(Individual Sachets)
No. of Individual sachets

per bag

.co

Production per day


(bags)

AN

Volume

(litres produced/day)

RA

******SOME TEXT MISSING******

NA
I

Each bag of pure water sachet goes for as low as N 50. So if we are to use the rainy season
numbers to estimate the expected sales amount, the calculation will be as follows:

w.

Number of bags sold daily=***

ww

Cost per bag = N 50

Total Daily Sales = N 50 X *** bags


= N ***

Total Monthly Sales = N *** X 26 days


= N *****
Estimated Monthly Profit = Total Monthly Sales Total Monthly Expenses
= N ******* - N *****
= N 428,000

http://www.NairaMan.com
+2348065008899

Page 19

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

MARKETING TECHNIQUES
There are various marketing techniques that can be applied. You must direct all your techniques
toward sales generations.

1.

Price: Good pricing mechanism is one marketing technique you must have. Your products
must not be the cheapest; otherwise it

******SOME TEXT

MISSING******.
******SOME TEXT MISSING******.

Promos:

3.

Use of promotional materials:

.co

2.

AN

******SOME TEXT

MISSING******.

5.

Advertisement:

******SOME TEXT

NA
I

Donation:

RA

******SOME TEXT MISSING*****.

4.

w.

MISSING******.

ww

Remember to inform NAFDAC of any advertising plans you may have.

APENDIX I
Sachet Machine

http://www.NairaMan.com
+2348065008899

Page 20

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

ww

w.

NA
I

RA

AN

.co

Schematic Diagram of a Sachet Machine (Front)

http://www.NairaMan.com
+2348065008899

Page 21

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

ww

w.

NA
I

RA

AN

.co

Schematic Diagram of a Sachet Machine (Back)

http://www.NairaMan.com
+2348065008899

Page 22

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

ww

w.

NA
I

RA

AN

.co

Key To The schematic diagram of the sachet machine

http://www.NairaMan.com
+2348065008899

Page 23

SATCHET WATER PLAN (Designed By NAIRAMAN 2011)

USEFUL CONTACTS
9 SACHET MACHINE MANUFACTURER CONTACT (CHINA)

******SOME TEXT MISSING******


9 POLYETHYLENE ROLLS (SACHET) CONTACT (NIGERIA)

ww

w.

NA
I

RA

AN

.co

******SOME TEXT MISSING******

http://www.NairaMan.com
+2348065008899

Page 24

You might also like