Assumption College of Davao

Proposed 4-Storey School


Building with roof deck
LOCATION:
JP CABAGUIO AVENUE, DAVAO CITY

New ACD school building location

Proposed ACD Fascade

Proposed ACD Fascade

Proposed ACD Fascade

Proposed ACD
2nd & 3rd Floor plan

BUILDING FEATURES

CLASSROOM FEATURES

- REINFORCED CONCRETE STRUCTURES


(CAST-IN-PLACE)
- BUILDING FOOTPRINT 14x57m
- BUILDING FOOTPRINT AREA = 798 sqm
- 2 CORRIDORS, 2.55m WIDE
- 2 SETS OF COMFORT ROOM
- MECH & ELECTRICAL ROOM
- ACCESS STAIRS ON BOTH ENDS
- 1 UNIT 5 PERSON CAPACITY ELEVATOR
- RAINHARVESTER and SPRINKLER SYSTEM

- 7 x 9m FLOOR DIMENSION
- 63 sqm FLOOR AREA
- 40 SEATS CAPACITY (MAX 50)
- ELEVATED LEDGE LECTURER AREA
- WHITE BOARD . L=4.4m
- 2 SETS OF 1.2m WIDE ENTRY DOOR FROM
EACH CORRIDOR
- FLOOR FINISH : TILES
- 2.85m CLEAR CEILING HEAD
- ROUGH-INS FOR AIRCON (DRAINS AND ELEC)
-4 SETS OF OSCILLATING CEILING FANS

CLASSROOM FEATURES

- 7 x 9m FLOOR DIMENSION
- 63 sqm FLOOR AREA
- 40 SEATS CAPACITY (MAX 50)
- ELEVATED LEDGE LECTURER AREA
- WHITE BOARD . L=4.4m
- 2 SETS OF 1.2m WIDE ENTRY DOOR FROM
EACH CORRIDOR
- FLOOR FINISH : TILES
- 2.85m CLEAR CEILING HEAD
- ROUGH-INS FOR AIRCON (DRAINS AND ELEC)
-4 SETS OF OSCILLATING CEILING FANS

Option A (Ground & 2nd floor)

Progressive scheme
Option A (Ground & 2nd floor)
Advantages

Disadvantages

30 Million Budget will be


maximize
Immediate 10 classrooms
Phase 1 construction will serve as
a dry run for the phase 2 (3rd and
4th floors)

Additional cost for Temporary Dry


walls
Noise and disturbance if 3rd and 4th
floor resumes construction
Partial fascade
Rebars corrosion treatment cost
Waterproofing for 3rd floor slab

Option A (Ground & 2nd floor)

Option B (Ground to 4th floor + slab deck)

Progressive scheme
Option B (Ground to 4th floor + slab deck)
Disadvantages

Advantages

Partiality on Everything
No paint finishes (probably)
No steel planters
No facilities yet for proposes
Laboratory on the 4th floor
No Elevator yet

Contractors budget
60 Million Budget will be maximize on
major building structures

No Additional cost for Temporary


Dry walls
Less Noise and disturbance if other
works resumes
No Rebars corrosion treatment cost
Waterproofing for top floor slab
only