Professional Documents
Culture Documents
S10
Hoja resumen
Obra
0401001
Localizacin
120805
Fecha Al
20/03/2016
Presupuesto base
001
PAVIMENTO RIGIDO
004
OBRAS DE ARTE
1,258,177.53
595,652.77
005
OTROS
265,177.50
(CD)
S/.
COSTO DIRECTO
2,119,007.80
2,119,007.80
211,900.78
UTILIDAD 10%
211,900.78
================
SUBTOTAL
2,542,809.36
IGV 18%
457,705.68
EXPEDIENTE TECNICO 3%
63,570.23
SUPERVISION 3%
63,570.23
================
TOTAL DE PRESUPUESTO
3,127,655.50
S/.
389,515.19
MATERIALES
S/.
1,124,882.85
EQUIPOS
S/.
232,720.20
SUBCONTRATOS
S/.
371,970.06
S/.
2,119,088.30
20/03/2016