You are on page 1of 1

LRCL/CLJ

1035'

CLUJ-NAPOCA, ROMANIA

JEPPESEN

Apt Elev

10-9

5 FEB 10

N46 47.1 E023 41.2

CLUJ-NAPOCA

ATIS

CLUJ Tower

125.52

134.4

23-40

23-41

23-42

03^E

After landing all aircraft will turn


only on the turning bays at the end
of runway.

1100'

6890'

00785^

46-47

ARP

22565^

2100m
B

46-47
Elev
1035'

MET

Apron East
Apron West
Control
Tower

MET

Feet 0

1000
200

Meters 0

23-40

RWY
08
26

2000
600

400

3000
800

1000

4000
1200

23-41

23-42

ADDITIONAL RUNWAY INFORMATION


USABLE LENGTHS
LANDING BEYOND
Glide Slope
Threshold
TAKE-OFF
HIRL (60m)

CL (60m)

HIRL (60m)

CL (60m)

ALS

PAPI-L(3.0^)
PAPI-L(3.2^)
HIALS

6070' 1850m

5098' 1554m

WIDTH

6611' 2015m
6348' 1935m

98'
30m

NOISE ABATEMENT PROCEDURES


The auxiliary power unit is permitted functioning max 15 minutes after block on time and may be
started with max 30 minutes before scheduled time of departure.

.Standard.

1
All Rwys

TAKE-OFF

LVP must be in force

A
B
C
D

RL, CL
& mult. RVR req

RL & CL

RCLM (DAY only)


or RL

150m

200m

250m

200m

250m

300m

RCLM (DAY only)


or RL

NIL
(DAY only)

400m

500m

Operators applying U.S. Ops Specs: CL required below 300m.

CHANGES: Note.

| JEPPESEN, 1998, 2010. ALL RIGHTS RESERVED.

You might also like