OBRA : CONSTRUCCION SISTEMA DE RIEGO ACHIWAY EN LA COMUNIDAD DE HUARCAS, DISTRITO DE ACCOMARCA VILCAS HUAMAN - AYACUCHO
1- DATOS GENERALES
A- POR PESO
MATERIALES
CEMENTO
FIERRO, CLAVO, ALAMBRE
CABLES TIPO BOA DE 1''
CABLES TIPO BOA DE 5/8''
CABLES TIPO BOA DE 1/4''
MADERA
REJILLA DE F. COR.
YESO
PINTURAS Y PEGAMENTO
COMPUERTAS METALICAS
SIKA 1
TAPAS METALICAS
HERRAMIENTAS
OTROS (ACCESORIOS)
UNIDAD
BL.
KG
M
M
M
P2
KG
BL
GLN
UN
KG
UN
KG
KG
AFECTO IGV
645.00
1,100.00
88.00
56.00
154.00
432.00
2.00
56.00
35.00
2.00
14.00
36.00
150.00
150.00
PESO.UNIT.
42.50
1.00
2.75
1.07
0.17
2.50
45.00
25.00
4.00
65.00
1.00
45.00
1.00
1.00
PESO TOTAL
PESO.TOTAL
27,412.50
1,100.00
242.00
59.92
26.18
1,080.00
90.00
1,400.00
140.00
130.00
14.00
1,620.00
150.00
150.00
33,614.60
B- POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA FINA
M3
HORMIGN
M3
GRAVA O CANTO RODADO
M3
PIEDRA MEDIANA
M3
PIEDRA CHANCADA 1/2"
M3
ARENA GRUESA
M3
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
AFECTO IGV
2.00
1.00
0.00
0.55
40.00
39.00
82.55
SIN IGV
FLETE INC. EN COSTO
FLETE INC. EN COSTO
FLETE INC. EN COSTO
FLETE INC. EN COSTO
FLETE INC. EN COSTO
FLETE INC. EN COSTO
10.00
8.26
8.50
EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H = 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
Tub, 1/2"
4,500.00
U
0.00
0.00
Tub,3/4"
4,000.00
U
0.00
0.00
Tub, 1 1/2'' PVC SAP
2,500.00
U
0.00
0.00
Tub 2" PVC SAP
995.00
U
9.50
1.90
Tub 3" PVC SAP
850.00
U
0.00
0.00
Tubo F G de 6"
80.00
U
0.00
0.00
Tub 8" HDPE (200 mm)
240.00
U
474.00
79.00
Tub 8" PVC SAP (200 mm)
90.00
U
1,769.00
294.83
NUMERO TOTAL DE VIAJES
REDONDEO
DE MATERIAL
DE MATERIAL
DE MATERIAL
DE MATERIAL
DE MATERIAL
DE MATERIAL
UNIDAD DE TRANSPORTE
5.00
CAPACIDAD DEL CAMION ( M3 )
720.00
COSTO POR VIAJE S/.
3,500.00
CAPACIDAD DEL CAMION (KG)
0.21
No VIAJES
0.00
0.00
0.00
0.00
0.00
0.00
0.33
3.28
3.61
4.00
3.61
AFECTO IGV
7,059.07
2,918.95
9,978.02
SIN IGV
0.00
UNIDAD
CANTIDAD
NRO VIAJES
PRECIO/VJE
KG
33,614.60
KG
148,590.00
TOTAL KG
182,204.60
Nro DE VIAJES
4,287.17
2.40
DE LA TUBERIA
UND
375.73
Nro DE VIAJES
187.87
2.50
DE LA MADERA ROLLIZA
UND
3.00
Nro DE VIAJES
3.00
2.50
FLETE TOTAL POR TRASLADO DE MATERIALES, AGREGADOS, ETC AL LUGAR DE TRABAJO
PARCIAL
10,289.21
469.68
7.50
10,771.87
AFECTO IGV
9,978.02
SIN IGV
10,771.87
9,978.02
10,771.87
FLETE TOTAL
20,749.89