Contractor: Master Engineers

Route Length: 2Kms


Route :Chintel-Reliance- RTTC
Bill of Services
SCHEDULE OF ITEM RATES FOR NLD ROUTE
Sl.No. Description Unit Rates
2A. Trenching in all types of soil except hard rock and asphalt
(II) Trenching depth less than 1.7M and more than 1.0M and trench
M 0
width of 0.3m
2F. Laying of fresh ducts and/or re-laying of used ducts in the trench
M 0
and/or clamping of ducts with all protective measures.
2G 175 mm Dia HDD with pulling of 1 ducts as per site condition, if
Mt 150
required
e. Semi Skilled-Labour Day 0
Subtotal of Bill of services( excluding S/Tax)
S/Tax @10% 10%
Surchare @ 2% 2%
Surcharge @ 1% 1%
Subtotal of Bill of services( Including S/Tax)
Note: For all of the above items (Bill of services), Service Tax will be paid extr
Bill of Materials
ii Supply of Splice/pull through chamber of type A No. 0
Subtotal of Bill of Materials( excluding VAT)
VAT @ applicable in the respective area.
Note: For all of the aboveofitems
Subtotal Bill of Materials(
(Bill Including
of materials), VATVAT)
will be paid
extra at actual.
Total of Bill of Serices( including s/Tax) + Bill of
materials(including VAT.)
Total Bill value to be paid:
Note: 1. Formula has been applied on the excel sheet therefore please enter the numbers only no unit.
2.Rows , which are not applicable must be deleted to avoide larger print area. Do not hide the rows.

Summary Of Bill Amount in INR


Date 31.08.10
CM Charges 300000
Total S/Tax (on CM ) 30900
10% 30000
2% 600
1% 300
Material Cost 0
Vat (on Material cost) 0
Total Amount 330900
Date: 31.08.10

Qty Amount Rs. Remarks

0 0

0 0

2000 300000
0 0
300000
30000
600
300
330900
vice Tax will be paid extra at actual.

0 0
0
0
0

330900
330900
numbers only no unit.