Field Observation Report

Project Title
Project Address
Architect Project # Date of Visit
Observed By: Time of Arrival
Client Time of Departure

SITE CONDITIONS (Shaded and Bold)


Temperature (F) Below 32° 32-55° 55-75° 75-100° 100+°
Weather Conditions Sunny Clear Overcast Foggy Rainy

PERSONNEL ON SITE (X if Present)


X Example Abatement Casework Roofing
Heavy Civil Fire System Windows Landscaping
Mass Excavation Insulation Rough Carpentry Furniture
Foundation Mechanical Masonry Paving
Site Work Electrical Elevator Curbs & Gutters
Structural Steel Plumbing

CONSULTANTS ON SITE (X if Present)


Engineer of Record Geotechnical Engineer
Acoustical Engineer Roofing Consultant
Ownership Waterproofing Consultant
Property Manager Curtain Wall Consultant
Owner's Rep.

STATUS OF COMPLETION (optional)


Estimated Completion Percentage:
Status as Compared to Most Recent
Ahead of Schedule On Schedule Behind Schedule
Schedule ( Bold):

Work Observed:
Field Observation Report #
Job #:
Page 2

Work Observed:

Nonconforming Work:

For Distribution Attachments


Name Firm Description # of Pages
cc:

Disclaimer: Inspections performed by the Architect/CM under this contract have been conducted under the limited conditions as
described by site observations in the AIA Documents A201, General Conditions of the Contract for Construction, as referenced in the
Owner-Architect Agreement.

Information contained in this Field Observation Report by firm name has been prepared to the best of our knowledge according to
observable conditions at the site. This information will be approved record unless written notice to the contrary is received within
seven (7) calendar days of the issue date of this document. Written corrections shall be reported to observer at firm name. Oral
rebuttals will not be accepted.