WORK CONSISTS, IN GENERAL, OF THE REMOVAL OF a PANELBOARD, STARTERS, DISCONNECT SWITCHES, FEEDERS, ETC., AND REPLACE WITH NEW. ALL WORK WITHIN THE MECHANICAL / ELECTRICAL ROOMS AND OUTSIDE OF THE BUILDING CAN BE PERFORMED DURING THE NORMAL WORKING DAYS AND HOURS, UNLES
WORK CONSISTS, IN GENERAL, OF THE REMOVAL OF a PANELBOARD, STARTERS, DISCONNECT SWITCHES, FEEDERS, ETC., AND REPLACE WITH NEW. ALL WORK WITHIN THE MECHANICAL / ELECTRICAL ROOMS AND OUTSIDE OF THE BUILDING CAN BE PERFORMED DURING THE NORMAL WORKING DAYS AND HOURS, UNLES
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
WORK CONSISTS, IN GENERAL, OF THE REMOVAL OF a PANELBOARD, STARTERS, DISCONNECT SWITCHES, FEEDERS, ETC., AND REPLACE WITH NEW. ALL WORK WITHIN THE MECHANICAL / ELECTRICAL ROOMS AND OUTSIDE OF THE BUILDING CAN BE PERFORMED DURING THE NORMAL WORKING DAYS AND HOURS, UNLES
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
PANELBOARD, STARTERS, DISCONNECT SWITCHES, FEEDERS, ETC., AND REPLACE WITH NEW.
B. ALL EXISTING SYSTEMS ARE TO OPERATE CONCURRENTLY
AND CONTINUOUSLY, EXCEPT AS DESCRIBED HEREIN.
C. THE WORK SCHEDULE IN OCCUPIED AREAS SHALL BE
COORDINATED AND AGREED UPON BY THE CONTRACTOR AND BY THE CONTRACTING OFFICER'S REPRESENTATIVE, AND SHALL BE APPROVED BY THE BUILDING MANAGER.
2. PHASING OF WORK:
A. ALL WORK WITHIN THE MECHANICAL/ELECTRICAL ROOMS
AND OUTSIDE OF THE BUILDING CAN BE PERFORMED DURING THE NORMAL WORKING DAYS AND HOURS, UNLESS OTHERWISE SPECIFIED.
B. USE OF NOISE PRODUCING EQUIPMENT DURING
CONSTRUCTION (CORE DRILLING, ETC.), SHALL BE LIMITED TO AFTER HOURS (7:00 P.M. - 5:00 A.M.), AND SHALL BE PERFORMED ON WEEKENDS.
C. ALL WORK WITHIN THE OCCUPIED AREAS SHALL BE
PERFORMED DURING THE WEEKENDS AND SHALL BE PERFORMED AS FOLLOWS:
1) ALL WORK REQUIRED UNDER THIS CONTRACT SHALL
BE PERFORMED WHILE THE BUILDING IS FULLY UTILIZED AND OCCUPIED. ALL WORK SHALL BE PERFORMED SO THAT INCONVENIENCE AND ADVERSE IMPACT TO THE BUILDING OCCUPANTS DURING CONSTRUCTION IS MINIMAL.
2) EACH DAY AT THE START OF WORK, THE
CONTRACTOR SHALL PROTECT FURNITURE, EQUIPMENT, FIXTURES AND APPURTENANCES WITHIN THE WORK AREA FROM DUST AND DAMAGE.
3) AT THE END OF EACH WORK PERIOD, THE
CONTRACTOR SHALL REMOVE ALL CONSTRUCTION MATERIALS, EQUIPMENT, TOOLS, ETC., FROM THE AREA OF WORK, CORRIDORS, OR ANY OTHER AREAS OF THE BUILDING NOT DESIGNATED BY THE CONTRACTING OFFICER'S REPRESENTATIVE AS A STORAGE AREA. THE CONTRACTOR SHALL DUST, VACUUM AND LEAVE THE AREA, INCLUDING CIRCULATING CORRIDORS AND ELEVATORS CLEAN, FREE OF ANY TRASH OR DEBRIS AND DUST.
4) WORK SHALL NOT INTERFERE WITH NORMAL WORK
OF OCCUPANTS EXCEPT TO THE EXTENT DESCRIBED HEREIN.
3. ELECTRICAL POWER INTERRUPTION:
A. SHUT DOWN OF ANY SYSTEM SHALL BE SCHEDULED AT
LEAST 14 CALENDAR DAYS WITH ADVANCE WRITTEN NOTICE TO THE BUILDING MANAGER OR THE CONTRACTING OFFICER'S REPRESENTATIVE.