Thread - Reference No: JIHI -WTRAN-002398


Thread Mail No Type Subject From Recipients Status Date

JIHI - Workflow Final (WF-002293) Submittal - Mr Rouber Awd - Mr Elias N/A 09/10/2010
WTRAN- Transmittal Mechanical/Plumbing/Drainage (less than Jacobs Karam -
002398 100 pgs) VALVES FOR HVAC - Crane International AECOM
Holding Inc.

Workflow Transmittal JIHI -WTRAN-002398


To (6) Mr Elias Karam - AECOM
Mr Ganesh Krishnamurthy - AECOM
Ms Rachel McKenna - AECOM
Mr Rouber Awd - Jacobs International Holding Inc.
Mr Thanki Kumar - KEO International Consultants
Mr Varghese Mathai - SIXCO - SAMSUNG JV
Cc (6) Mr Abdul Rasheed Nahas - AECOM
Ms Isabelita Balingit - Aedas Ltd.
Ms Salwa Batniji - ALDAR
Mr Walter Bissonnette - Jacobs International Holding Inc.
Mr Ghouse Khan - Jacobs International Holding Inc.
Mr Tom Lewakowski - Jacobs International Holding Inc.
From Mr Rouber Awd - Jacobs International Holding Inc.
Sent Saturday, 9 October 2010 3:36:54 PM GST (GMT +04:00)
Attribute 1 PD - Product Data
Attribute 2 23 05 23 GENERAL-DUTY VALVES FOR HVAC PIPING
Status N/A
Subject Final (WF-002293) Submittal - Mechanical/Plumbing/Drainage (less than 100 pgs) VALVES FOR
HVAC - Crane

Document Attachments (1)

Update Register View Attachment Properties Actions Download Files

File Document No Revision Revision Date Title Status

c
d
e
f
g CCAD-ETA-MMS-HV-000009 01 VALVES FOR HVAC - Crane Approved as Noted

Workflow Review History


The attached documents have completed the "Submittal - Mechanical/Plumbing/Drainage (less than 100 pgs) VALVES FOR HVAC -
Crane" workflow with the following results :
This transmittal was automatically generated.
Doc No Step Participant Review Outcome Comments
CCAD-ETA-MMS-HV- Designer Review E Karam A: APPROVED
000009
Jacobs Validity and R Awd D: REVIEWED
Owner Check
Construction T Kumar D: REVIEWED In compliance with LEED
Supervision Review V2.2 credit EA-03
(Enhanced
Commissioning)
requirements, the
commissioning Authority
(CxA) review comment is:
the combination of the

https://aldar.aconex.com/ViewCorrespondence?Correspondence_ID=673106875&CO... 10/10/2010
Page 2 of 2

double regulating valve


with the flow
measurement device
(DM975G+DM900) should
be factory delivered to site
as one unit (not 2 loose
pieces).
Jacobs Review R Awd B: APPROVED AS - Refer to the attached
NOTED comments.

Refer To Mail No From From Organization Subject

https://aldar.aconex.com/ViewCorrespondence?Correspondence_ID=673106875&CO... 10/10/2010