Area (m^2) 1000
Volume Solid (%): TSR (m^2/lt)
* Primer Coat 60 10
* Intermediate Coat 66.7 WFT (mikron)
* Top Coat 60 120
Dry Film Thickness, DFT (mikron): Consumption Factor, CF
* Primer Coat 60 2
* Intermediate Coat 100 Practical consumption (litre)
* Top Coat 30 200
Maximum Thinner (%) 20
Loss Factor (%) 50
Abrasive Consumption (kg/m^2) 50
INTERMEDIATE
COST
Paint (Rp/lt): TSR (m^2/lt)
* Primer Coat 80000 7
* Intermediate Coat 80000 WFT (mikron)
* Top Coat 120000 180
Thinner (Rp/lt): Consumption Factor, CF
* Primer Coat 20000 2
* Intermediate Coat 20000 Practical consumption (litre)
* Top Coat 30000 300
Abrasive (Rp/kg):
*Sand 1000
Equipment (Rp/day):
* Blasting 400000
* Coating 300000 TOP
* PPE 50000
Manpower (Rp/day): Total: TSR (m^2/lt)
* Blaster 100000 4 20
* Painter 100000 1 WFT (mikron)
* Helper 50000 1 60
* Inspector 400000 1 Consumption Factor, CF
Miscellaneous (Rp/day): 1 2
* Consumable 50000 Practical consumption (litre)
100
PROFIT (%) 10
WORK SPEED (m^2/day) 10
OUTPUT:
COST OF PROJECT
Material Consumption
Unit Price of Paint (Rp/litre) Thinner (litre) Price of Thinner (Rp/litre) Cost Total (Rp)
(Paint+Thinner) Paint
Primer 200 160 litre 80000 40 20000 13,600,000
Intermediate 300 240 litre 80000 60 20000 20,389,805
Top 100 80 litre 120000 20 30000 10,200,000
Total (Rp) 44,189,805
Abrasive Unit (Rp/kg)
50 kg/m^2 50000 kg 1000 50,000,000
Thinner
Areal Preparation and System per Area No. of square meter Component DFT (micron) WFT (micron) Nozzle Pressure bar Overcoat at time hrs Dust dry after hrs
(%) Type Mixing Type Cleaning
DAILY INSPECTION REPORT
PROJECT: DATE: REPORT:
CONTRACTOR: SPECIFICATION: LOCATION:
Paint
Area/Item Blasted Area/Item Coated No. of Coat Batch No. WFT DFT Total (lt)
Code Name
EQUIPMENT:
□ Generator □ Compressor □ Blast Pots □ Airless Spray □ Conventional Spray