Professional Documents
Culture Documents
YDH
ENGG CERT
DCO
DESCRIPTION
REV
NO.
06-11
DATE
JO/EWO
DISCIPLINE
ENGINEER
AMS
06-11
DATE:
PROJECT
ENGINEER
YDH
06-11
DATE:
PLANT MATERIALS................................................................................................................................................ 75
CERTIFIED
DCO
06-11
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
REVISIONCERTIFICATION
CERTIFICATE
EDSD
VERIFICATION
CONTROL NUMBER
DATE:
DOC
SAUDI ARABIA
DOC
JO / EWO:
DRAWING NO.
DD - AE0003
25-00012-0001
SHT.NO.
REV.NO.
2
OF
577
00
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
YDH
ENGG CERT
DCO
DESCRIPTION
REV
NO.
06-11
DATE
JO/EWO
DISCIPLINE
ENGINEER
AMS
06-11
DATE:
PROJECT
ENGINEER
YDH
06-11
DATE:
CERTIFIED
DCO
06-11
DATE:
CONSTRUCTION
AGENCY
OPERATIONS
DATE:
BY:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
EDSD
VERIFICATION
DATE:
REVISION
REVISIONCERTIFICATION
CERTIFICATE
DATE:
CONSTRUCTION SPECIFICATIONS
THUWAL TOWN DEVELOPMENT
DOC
SAUDI ARABIA
DOC
JO / EWO:
DRAWING NO.
DD - AE0003
25-00012-0001
SHT.NO.
REV.NO.
3
OF
577
00
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
YDH
ENGG CERT
DCO
DESCRIPTION
REV
NO.
06-11
DATE
JO/EWO
DISCIPLINE
ENGINEER
AMS
06-11
DATE:
PROJECT
ENGINEER
YDH
06-11
DATE:
CERTIFIED
DCO
06-11
DATE:
CONSTRUCTION
AGENCY
OPERATIONS
DATE:
BY:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
EDSD
VERIFICATION
DATE:
REVISION
REVISIONCERTIFICATION
CERTIFICATE
DATE:
CONSTRUCTION SPECIFICATIONS
THUWAL TOWN DEVELOPMENT
DOC
SAUDI ARABIA
DOC
JO / EWO:
DRAWING NO.
DD - AE0003
25-00012-0001
SHT.NO.
REV.NO.
4
OF
577
00
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
YDH
ENGG CERT
DCO
DESCRIPTION
REV
NO.
06-11
DATE
JO/EWO
DISCIPLINE
ENGINEER
AMS
06-11
DATE:
PROJECT
ENGINEER
YDH
06-11
DATE:
CERTIFIED
DCO
06-11
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
BY:
DATE:
(DCC) NO. _____________________
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
REVISIONCERTIFICATION
CERTIFICATE
EDSD
VERIFICATION
CONTROL NUMBER
DATE:
CONSTRUCTION SPECIFICATIONS
THUWAL TOWN DEVELOPMENT
DOC
SAUDI ARABIA
DOC
JO / EWO:
DRAWING NO.
DD - AE0003
25-00012-0001
SHT.NO.
REV.NO.
5
OF
577
00
EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS