You are on page 1of 2

15] ACCE L&T FORMWORK AWARD 2011 FOR BEST USE OF FORMWORK IN CIVIL ENGINEERING

DETAILS REQUIRED (two SOFT copies AND ONE HARD COPY ) Nature of project and its location. Date of the award and commencement of work: Date of completion: Cost of project as awarded: Final project cost: 6. Reasons for cost over run, if any. Was it in your reach to cut down the cost overrun and how? What could have been savings by not allowing the cost over run 7. Salient features of design: 8. Salient features of construction and reasons for adopting proposed formwork 9. Is project of National importance? 10. Was project completed in time? If delayed, how much? Reasons thereof. 11. Did you execute the work yourself or by subletting? 12. Constraints at site and methods and details adopted to overcome constraints, if any. Please furnish detail write up along with sketches/drawings/photos, if any: 13. Constraints in design and methods and details adopted to overcome constraints, if any. Please furnish detail write up along with sketches/drawings/photos, if any: 14. Quality control techniques adopted 15. Whether any special equipments/ techniques used? If yes give details. 16. Construction / project management systems adopted (give details): 17. Technical details of formwork system used including drawings and assembly details of materials for formwork. 18. Indicate saving in time, cost and improvement in quality of construction by using the system. 19. Furnish photographs. 20. Furnish video CD if available. 21. Furnish Name and Addresses of : a) Owner: b) Consultant: c) Architect: 1. 2. 3. 4. 5.

Date Place

Name & Signature of Applicant

Above nomination is recommended for ACCE AWARDS 2011 - by Member Name Address Membership No Signature of the Member of ACCE(I)

You might also like