2010 -2011 [RAPPORT DE STAGE]

15 septembre 2011

2010-2011 Rapport de stage


TANGER MED UTILITIES. Ecole Nationale de lIndustrie Minrale.

SUJET :
ELABORATION DUN PLAN DE MAINTENANCE PREVENTIVE DES INSTALLATIONS ELECTRIQUES MT-BT GEREES PAR

TANGER MED UTILITIES AU PORT TANGER MED

REALISE PAR: ENCADRE PAR:


T.M.U

AFAILAL Mohamed. DADDA Marouane.

Mr. Bouzidi Hassan Mr BOUZIDI Hassan

| ENIM

[RAPPORT DE STAGE] 15 septembre 2011

SOMMAIRE
I. REMERCIEMENT.. II. INTRODUCTION :. 1. PORT TANGER MED. 1.1 PRESENTATION .. 1.2 POSITIONNEMENT GEOGRAPHIQUE 1.3 ACTIVITES 1.4 PLAN DU RESEAU ELECTRIQUE DU PORT. 2. T.M.U 3. PROJET 3.1 PREREQUIS 3.2 OBJECTIFS.. 3.3 ETAPES. III. LA MAINTENANCE :. 1. DEFINITION. 2. LA MAINTENANCE PREVENTIVE .. 2.1 DEFINITION. 2.2 OBLECTIFS VISES PAR LA MAINTENANCE PREVENTIVE IV. ETUDE DU PROJET :. 1. LINVENTAIRE PHISIQUE ET GEOGRAPHIQUE . 1.1 IDENTIFICATION DES EQUIPEMENTS. 1.2 LES INVENTAIRES (PRG & QS). 2. CHOIX DU TYPE DE MAINTENANCE .. 3. QUALTE DALIMENTATION
T.M.U | ENIM 2

[RAPPORT DE STAGE] 15 septembre 2011

3.1 Les perturbations 3.2 Qualit de llectricit 4. MISE EN PLACE DUN TABLEAU DE BORD DE MAINTENANCE . 4.1 CHEKLIST DES POSTES MT/BT. 4.2 PROGRAMME DENTRETIEN DES GROUPES ELECTROGENES 5. PROPOSITIONS .. V. CONCLUSION :.. VI. ANNEXES :. VII. REFERENCES :.

T.M.U

| ENIM

[RAPPORT DE STAGE] 15 septembre 2011

I - REMERCIMENTS :
Au terme de ce stage, je tiens remercier, et par un profond respect, toute lquipe technique qui ma pass tout son savoir-faire et ses expriences lors des actions ralises et qui na pas hsit de mapporter laide ncessaire pour accomplir ce travail. Jespre que ce travail soit tmoin de mon respect et de mon engagement au sein dune entreprise assez riche en techniques et en dmarches, qui est T.M.U.

II - INTRODUCTION
1. PORT TANGER MED :
1.1 Prsentation :
Le port Tanger Med est le plus grand port marocain en eau profonde dont la construction avait commenc en 2004, il a t mis en service en juillet 2007. Le port se trouve 14 km de l'Espagne dans une position stratgique sur la voie de passage entre l'Asie, l'Europe, l'Amrique du Nord et du Sud. Il est bord par une zone franche d'activits industrielles et logistiques.

1.2 Positionnement gographique :


Le port de Tanger Med est situ Oued Rmel dans le nord du Maroc, 22 km l'est de Tanger et 46 km au nord de Ttouan sur le dtroit de Gibraltar en Mditerrane. Il jouxte l'enclave espagnole de Ceuta, il est situ 14 km peine des ctes espagnoles, et se trouve sur la voie de passage du commerce maritime mondial Est-Ouest entre l'Asie, l'Europe et l'Amrique du Nord. Grce cette position
T.M.U | ENIM 4

[RAPPORT DE STAGE] 15 septembre 2011

stratgique, Tanger Med est devenu une plateforme logistique aux portes de l'Europe en jouant sur le fonctionnement de la production en juste--temps. En moins de 24 heures, une commande peut quitter le nord du Maroc et arriver au port de Barcelone ou celui de Marseille. Alors que de Shanghai, par exemple, il faut 22 jours par bateau (en plus de la traverse de zones dangereuses telles que le dtroit de Malacca et le Puntland). Le port est situ sur la seconde voie maritime la plus frquente au monde, le dtroit de Gibraltar avec plus de 100 000 bateaux par an. Son activit principale est le transbordement de conteneurs. Les porte-conteneurs gants dbarquent leurs marchandises sans dvier de leur route et repartent aussitt, charge ensuite de plus petits navires, ou feeders ships de desservir des ports de second ordre. La construction a t confie une socit appartenant l'tat marocain dnomme Agence Spciale Tanger Mditerrane(TMSA). Le port comprend 2 terminaux conteneurs, d'une capacit totale de 3,5 millions de conteneurs EVP), un terminal vraquier, un port passager et un terminal hydrocarbures. Le terminal 1 a t concd Maersk pour une dure de 30 ans, tandis que le terminal 2 est revenu au consortium Eurogate-Contship / MSC / CMA-CGM pour la mme dure. Il a par ailleurs sign des accords avec 50 ports de par le monde auquel il est reli par des lignes rgulires hebdomadaires.

1.3 Activits :
Le port a trait un trafic de 2,058 million de conteneurs en 2010 et prvoit 2,6 million de conteneurs en 2011. En 2013, Tanger Med pourrait traiter 3,5 millions de conteneurs, et deviendra ainsi le plus grand port d'Afrique au niveau du transbordement. Aprs l'achvement de la connexion autoroutire et ferroviaire et la mise en service de la zone franche logistique (medhub) en 2008, le port Ro-Ro et passagers, l'ouverture du terminal hydrocarbures et le quai vrac et divers en 2009, le terminal vhicules a vu le transfert des liaisons avec Algesiras en mai 2010, les autres lignes tant encore assures Tanger-ville jusqu'en octobre 2010. quip de 8 postes quai et de 35 hectares de terre-pleins, Tanger Med Passagers est conu pour transporter 7 millions de passagers et 700 000 vhicules par an.

T.M.U

| ENIM

[RAPPORT DE STAGE] 15 septembre 2011

La gestion du port est assure par "Tanger Med Port Authority (TMPA)". Cette dernire a ralis un chiffre d'affaires de 166 millions de dirhams au titre de l'exercice 2008, qui marque la premire anne de pleine exploitation commerciale.

1.4 Plan du rseau lectrique du port :

T.M.U

| ENIM

[RAPPORT DE STAGE] 15 septembre 2011

T.M.U

| ENIM

[RAPPORT DE STAGE] 15 septembre 2011

Comme on peut le constater sur le plan ci-avant, le site portuaire est desservi en lectricit partir dun poste source 60/22 KV et un rseau souterrain de tension 22 000 volts.

Poste Source ONE 60/22 kV

2. T.M.U :
Compte tenu de limportance des besoins du port de TANGER MED en termes deau, dlectricit et dassainissement, lONE, lONEP et PIZZORNO crent une Socit Anonyme nomme TANGER MED UTILITIES. Dote dun capital de M MAD 75,2, cette socit a pour objectif dassurer la distribution deau et dlectricit ainsi que lassainissement du port international de TANGER MED

3. PROJET :
3.1 Prrequis : - prise de connaissance physique des ouvrages constituant les rseaux lectriques MT/BT du port. - consultation des dossiers, plans et schmas lectriques. 3.2 Objectif : - proposer un plan de maintenance prventive optimise (PMP), permettant : Lamlioration des performances des rseaux de distribution lectrique. La rentabilit de lactivit.

T.M.U

| ENIM

[RAPPORT DE STAGE] 15 septembre 2011

3.3 Etapes : Apprhender linventaire physique et gographique de lensemble des installations lectriques (constitution, caractristiques, localisation, mode de fonctionnement etc). Analyser les risques et/ou dis-fonctionnent de chaque constituant, et laborer en consquence les indicateurs dalerte. Quantifier la frquence des interventions de maintenance et les ressources optimales mettre en uvre. Mettre en place un tableau e bord de maintenance destin aux exploitants et au service achats (gestion du stock de pices de rechange).

II - LA MAINTENANCE
1. Dfinition :
Daprs lAfnor (NF X 606010) : La maintenance est lensemble des actions permettant de maintenir ou de rtablir un bien dans un tat spcifi ou en mesure dassurer un service dtermin. Dans une entreprise, maintenir, cest donc effectuer des oprations (dpannage, rparation, graissage, contrle, etc..) qui permettent de conserver le potentiel du matriel pour assurer la production avec efficacit et qualit.

2. La maintenance prventive :
2.1 DEFINITION :
La maintenance prventive est lensemble des contrles, visites et interventions de maintenance effectues prventivement. Elle soppose la maintenance corrective dclenche par des perturbations ou par les vnements, et donc comprend : - Les contrles ou visites systmatiques - Les expertises, les actions et les remplacements effectus la suite des contrles ou des visites
T.M.U | ENIM 9

[RAPPORT DE STAGE] 15 septembre 2011

- Les remplacements systmatiques - La maintenance conditionnelle ou les contrles non destructifs. La maintenance prventive ne doit pas consister dire un agent de maintenance : allez voir si ltat dun tel organe est bon au moyen dune liste des points examiner. Dans ce cas si ltat est bon on ne dit rien, sil nest pas bon il faut intervenir de suite ce qui ncessite forcment une disponibilit en pices de rechange. Il sagit dune dtection danomalie et non de maintenance prventive. Au contraire, la maintenance prventive doit consister suivre lvolution de ltat dun organe, de manire prvoir une intervention dans un dlai raisonnable et lachat de la pice de remplacement ncessaire.

2.2 OBLECTIFS VISES PAR LA MAINTENANCE PREVENTIVE : Amliorer la fiabilit du matriel Garantir la qualit du produit Amliorer lordonnancement des travaux Assurer la scurit humaine Amliorer la gestion de stock Amliorer le climat des relations humaines

III - ETUDE DU PROJET


1. LINVENTAIRE PHISIQUE ET GEOGRAPHIQUE :
En raison de linsuffisance de la priode de notre stage et afin dviter une redondance dans notre travail, on a convenu de traiter uniquement un chantillon significatif parmi lensemble des installations du port. Cet chantillon sera constitu de : - Un poste rpartiteur gnral, - Un poste MT/BT, - Un groupe lectrogne. Il est entendu que les rsultats obtenus partir de lchantillon en question seront gnraliss sur le reste des quipements.
T.M.U | ENIM 10

[RAPPORT DE STAGE] 15 septembre 2011

Poste MT/BT du Quai de Service

Poste Rpartiteur Gnral N1

1.1 IDENTIFICATION DES EQUIPEMENTS : Cellules prfabriques SM6 :


Les cellules SM6 tant des cellules prfabriques, permettent de raliser la partie MT des postes de transformation MT/BT de distribution publique et des postes de livraison ou de rpartition MT jusqu une tension disolement de 36 KV (Bord de mer). Lors de notre tude on a identifi plusieurs types de cellule : - Cellule interrupteur - Cellule disjoncteur - Cellule de mesure - Cellule de couplage - Cellule de protection transformateur - Cellule gaine barre Ce type de cellule offre une meilleure protection vis--vis du personnel exploitant et permet un gain despace considrable qui justifient nettement leur surcot par rapport aux cellules de type Ouvert.
T.M.U | ENIM 11

[RAPPORT DE STAGE] 15 septembre 2011

TRANSFORMATEUR :
Les transformateurs de puissance utiliss sur le port sont du type immerg dans lhuile (liquide dilectrique). Les diffrentes puissances utilises sont : 250, 400, 630 et 800 KVA.

GROUPE ELECTROGENE :
Les groupes lectrognes coupls au rseau dmarrent de faon autonome et automatique. Un moteur diesel entrane un alternateur. Il est mis en service par un dmarreur (moteur auxiliaire courant continu). Une batterie en charge permanente, alimente le dmarreur lors de la disparition du secteur. Le couplage sur linstallation est ralis par des contacteurs inverseurs. Compte tenu du caractre nvralgique du port toute interruption du courant lectrique risque de paralyser son activit, raison pour laquelle le distributeur a prvu la mise en place dun groupe de secours cot des postes MT/BT situs dans les zones sensibles.

Groupe Electrogne
T.M.U | ENIM 12

[RAPPORT DE STAGE] 15 septembre 2011

INVERSEUR :
Dans le but dviter tout retard de dmarrage dun groupe lectrogne en cas dinterruption du courant, il a t prvu linstallation dun Inverseur Normal / Secours (INS) qui suite une absence de tension il fait dmarrer le moteur.

TGBT :
TGBT est un sigle qui dsigne : Tableau Gnral Basse Tension o sont regroups tous les disjoncteurs de dparts BT vers les utilisateurs, ainsi quun interrupteur gnral darrive et dautres accessoires comme les compteurs, horloges etc...

EQUIPEMENTS DE SECURITE :
Chaque poste est muni de plusieurs accessoires de scurit savoir : - Une perche - Un tabouret en matire isolante - Une paire de gants isols 36 KV - Un extincteur poudre 10 Kg - Un schma unifilaire du poste

EN TIFICATION DES EQUIPEMENTS :


T.M.U | ENIM 13

[RAPPORT DE STAGE] 15 septembre 2011

1.2 LES INVENTAIRES (PRG & QS) :

POSTE QS

EQUIPEMENT
CABLES

COMPOSANTS Ame en aluminium JEU DE BARRE section= longueur=

CARACTERISTIQUES PRC Unipolaire - 240 mm2 N:0642143C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE INTERRUPTEUR

INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE CORDON TELECOMUNICATION JEU DE BARRE section= longueur= INTERRUPTEUR SF6 FUSIBLE TT BOITIER MISE A LA TERRE VEROUIALLAGE JEU DE BARRE section= longueur= BOITIER MISE A LA TERRE VEROUIALLAGE INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION

N:0647119C Ur=24KV Ud=70KV Up=125KV Ir=50A Anne: 2006

CELLULE MESURE

N:0647107C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE ARRIVEE

T.M.U

| ENIM

14

[RAPPORT DE STAGE] 15 septembre 2011


JEU DE BARRE section= longueur= SF6 N:0642129C Ur=24KV Ud=70KV Up=125KV Ir=200A N:0642141C Ur=24KV Ud=70KV Up=125KV Ir=200A

CELLULE TRASFO

INTERRUPTEUR FUSIBLE BOITIER MISE A LA TERRE RELLAIS

CABLES DE LIAISON MT/TR

TRANSFO

________ BORNES MT BORNESBT CUVE ENROULLEMENT HUILE MISE A LA TERRE DGPT ________

MARQUE:BELTRANSFO PUISSANCE:800KVA COUIPLAGE:DYN11 22000/400V 21/1155A Ucc=4,9% 3*(4*240)mm2 CU 3*240mm2 CU 1*120mm2 CU 4*12V

CABLES DE LIAISON BT (TR-TGBT)

BATTERIES

ARMOIRE MISE A LA TERRE JEU DE BARRE section= longueur= DISJONCTEUR GENERAL MICROLOGIC TC Dpart1 Dpart2 Dpart3 Dpart4 Dpart5 Dpart6 Dpart7 Dpart8 ARMOIRE MISE A LA TERRE JEU DE BARRE Section= longueur= TC DISJONCTEUR GENERAL Dpart1 Dpart2 Dpart3 1250A 11250A 1250/5A NR250F NR250F NR250F NR160F NR100F NR100F NR400F NR400F

TGBT1

TGBT2

NR100F NR100F NR100F | ENIM 15

T.M.U

[RAPPORT DE STAGE] 15 septembre 2011


Dpart4 Dpart5 Dpart6 Dpart7 Dpart8 Dpart9 Dpart10 Dpart11 2 COMPTEURS COFFRET 3 TC SECTIONNEUR CONTACTEUR REPARTITEUR 6 DISJONCTEUR Dpart PORTE FUSIBLE HORLOGE ARMOIRE EXTINCTEUR PERCHE TABOURET MANIVELLE FUSIBLES DE RECHANGES DETECTEUR DE FUMEEE AMPOULES AFFICHES BLOC SECOURS PORTE AERATIONS CANIVEAU PEINTURE TRAPES CONDUITES D'EAU NR100F NR250F NR100F NR250F NR250F NR160F NR250F

COFFRET COMPTAGE

COFFRET EP

EQUIPEMRNT DE SECURITE

GENIE CIVIL

T.M.U

| ENIM

16

[RAPPORT DE STAGE] 15 septembre 2011

POSTE PRG 1
EQUIPEMENT
CABLES

COMPOSANT ________ JEU DE BARRE section= longueur= SF6

CARACTERISTIQUES 240 mm2 AL N:0647027C Ur=24KV Ud=70KV Up=125KV Ir=400A Anne: 2006

CELLULE MESURE CM

INTERRUPTEUR FUSIBLE TT BOITIER MISE A LA TERRE VEROUIALLAGE JEU DE BARRE

section= longueur=

N:0647021C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE ARRIVEE DM2

BOITIER MISE A LA TERRE VEROUIALLAGE INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION JEU DE BARRE section= longueur=

N:0647015C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

BOITIER MISE A LA TERRE


CELLULE DEPART DM1A

VEROUIALLAGE INTERRUPTEUR DISJONCTEUR PROTRCTION JEU DE BARRE SF6

CELLULE DEPART DM1A

section= longueur=

N:0647017C

T.M.U

| ENIM

17

[RAPPORT DE STAGE] 15 septembre 2011


Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE DEPART DM1A

BOITIER MISE A LA TERRE VEROUIALLAGE INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION JEU DE BARRE Section=

N:0647G10C Ir=630A N:0647023C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

GBM JEU DE BARRE Longueur= section= longueur=

CELLULE INTERRUPTEUR IMB

INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE

CORDON TELECOMUNICATION JEU DE BARRE section= longueur=


CELLULE TRASFO

N:0647025C Ur=24KV Ud=70KV Up=125KV Ir=200A

INTERRUPTEUR SF6 FUSIBLE BOITIER MISE A LA TERRE RELLAIS _______ JEU DE BARRE section= longueur= BOITIER MISE A LA TERRE VEROUIALLAGE INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION JEU DE BARRE section= longueur= BOITIER MISE A LA TERRE VEROUIALLAGE

CABLES

35mm2 N:0647013C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE DEPART DM1A

N:0647011C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006 | ENIM 18

CELLULE DEPART DM1A

T.M.U

[RAPPORT DE STAGE] 15 septembre 2011


INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION JEU DE BARRE section= longueur= BOITIER MISE A LA TERRE VEROUIALLAGE INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION JEU DE BARRE section= longueur= INTERRUPTEUR SF6 FUSIBLE TT BOITIER MISE A LA TERRE VEROUIALLAGE JEU DE BARRE section= longueur= INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE CORDON TELECOMUNICATION ________ JEU DE BARRE section= longueur=

N:0647019C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE ARRIVEE DM2

N:0647029C Ur=24KV Ud=70KV Up=125KV Ir=400A Anne: 2006

CELLULE MESURE CM

N:0647284C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006 240mm2 AL N:0647288C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006 N:0647356C Ur=24KV Ud=70KV Up=125KV Ir=50A Anne: 2006

CELLULE INTERRUPTEUR IM

CABLES DE BOUCLAGE

CELLULE INTERRUPTEUR IM

INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE CORDON TELECOMUNICATION JEU DE BARRE section= longueur= INTERRUPTEUR SF6 FUSIBLE TT BOITIER MISE A LA TERRE VEROUIALLAGE

CELLULE MESURE CM

T.M.U

| ENIM

19

[RAPPORT DE STAGE] 15 septembre 2011


JEU DE BARRE section= longueur= N:0647101C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE DEPART DM1A

BOITIER MISE A LA TERRE VEROUIALLAGE INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION JEU DE BARRE section= longueur= INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE CORDON TELECOMUNICATION JEU DE BARRE section= longueur= BOITIER MISE A LA TERRE VEROUIALLAGE INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION JEU DE BARRE

N:0647350C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006 N:0647103C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE INTERRUPTEUR IMB

CELLULE DEPART DM1A

section= longueur=

N:0647354C

CELLULE MESURE CM

INTERRUPTEUR SF6 FUSIBLE TT BOITIER MISE A LA TERRE VEROUIALLAGE JEU DE BARRE section= longueur= INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE CORDON TELECOMUNICATION _______

Ur=24KV Ud=70KV Up=125KV Ir=50A Anne: 2006

N:0647344C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE INTERRUPTEUR IM

CABLES T.M.U

35mm2 | ENIM 20

[RAPPORT DE STAGE] 15 septembre 2011


JEU DE BARRE section= longueur= N:0647380C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006 N:0647117C Ur=24KV Ud=70KV Up=125KV Ir=50A Anne: 2006

CELLULE INTERRUPTEUR IM

INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE CORDON TELECOMUNICATION JEU DE BARRE section= longueur= INTERRUPTEUR SF6 FUSIBLE TT BOITIER MISE A LA TERRE VEROUIALLAGE JEU DE BARRE section= longueur= BOITIER MISE A LA TERRE VEROUIALLAGE INTERRUPTEUR SF6 DISJONCTEUR PROTRCTION JEU DE BARRE section= longueur= INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE CORDON TELECOMUNICATION JEU DE BARRE section= longueur=

CELLULE MESURE CM

N:0647105C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE DEPART DM1A

N:0647382C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006 N:0647109C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE INTERRUPTEUR IMB

BOITIER MISE A LA TERRE


CELLULE DEPART DM1A

VEROUIALLAGE INTERRUPTEUR DISJONCTEUR PROTRCTION T.M.U SF6

| ENIM

21

[RAPPORT DE STAGE] 15 septembre 2011


JEU DE BARRE section= longueur= N:0647115C Ur=24KV Ud=70KV Up=125KV Ir=50A Anne: 2006

CELLULE MESURE CM

INTERRUPTEUR SF6 FUSIBLE TT BOITIER MISE A LA TERRE VEROUIALLAGE JEU DE BARRE section= longueur= INTERRUPTEUR SF6 MISE A LA TERRE VEROUIALLAGE CORDON TELECOMUNICATION ARMOIRE MISE A LA TERRE JEU DE BARRE Section= longueur= 3 TC DISJONCTEUR GENERAL MICROLOGIC Dpart1 Dpart2 Dpart3 Dpart4 Arriv 3 TC SECTIONNEUR CONTACTEUR REPARTITEUR 12 DISJONCTEUR Dpart PORTE FUSIBLE HORLOGE ARMOIRE EXTINCTEUR PERCHE TABOURET MANIVELLE FUSIBLES DE RECHANGES DETECTEUR DE FUMEEE AMPOULES AFFICHES BLOC SECOURS

N:0647348C Ur=24KV Ud=70KV Up=125KV Ir=630A Anne: 2006

CELLULE INTERRUPTEUR IM

TGBT

1250/5A 400A NR100F NR100F NR250F NR160F FE160 INS 160

COFFRET EP

EQUIPEMRNT DE SECURITE

T.M.U

| ENIM

22

[RAPPORT DE STAGE] 15 septembre 2011


GENIE CIVIL

PORTE AERATIONS CANIVEAU PEINTURE TRAPES CONDUITES D'EAU

2. CHOIX DU TYPE DE MAINTENANCE


Etant donn que les clients du port par la nature de leurs activits ne tolrent pas des coupures frquentes dlectricit, nous avons opt pour une maintenance prventive afin damliorer la fiabilit du matriel et par consquent la qualit du service.

3. QUALTE DALIMENTATION (Power Quality) 3.1 Les perturbations


Depuis toujours, le fonctionnement - voire lintgrit - de certains quipements lectriques est affect par des perturbations. Ces perturbations peuvent pntrer dans les quipements sensibles par diverses voies : - lalimentation lectrique : problme gnral considr ici, - les entres et sorties de signaux, les connexions de terre, couplage inductif ou capacitif, rayonnement... : problmes plus localiss de compatibilit lectromagntique dans les sites industriels. Lalimentation lectrique consiste en un systme triphas dondes de tension qui se caractrise par la frquence, lamplitude, la forme donde sinusodale et la symtrie du systme triphas. Une alimentation parfaite nexiste pas et, dans le langage courant, on dit que les quatre caractristiques sont affectes de perturbations , mme si ces dernires restent limites des niveaux nimpliquant aucun drangement pour les quipements sensibles. En 1985, une Directive Europenne relative au rapprochement des dispositions des Etats membres en matire de responsabilit du fait des produits dfectueux stipulait explicitement que llectricit est aussi un produit. On parle beaucoup depuis lors de la qualit du produit lectricit, mme si le concept est discut : llectricit ne pouvant tre aisment stocke, la production doit suivre la consommation en temps rel. La tension est d'excellente qualit la sortie des centrales et le systme entier contribue consolider cette qualit (stabilit
T.M.U | ENIM 23

[RAPPORT DE STAGE] 15 septembre 2011

d'amplitude et de frquence, puissance de court-circuit), mais elle subit nombre daltrations au cours de son transport, principalement sous linfluence des installations perturbatrices de la clientle ou dincidents fortuits. Llectricit pose par consquent des problmes de qualit spcifiques diffrents des autres grands produits industriels. Lair du temps veut que lon parle maintenant de qualit de l'lectricit (souvent via lexpression anglo-saxonne de power quality) ou de compatibilit lectromagntique l o lon parlait nagure de perturbations et "d'interfrences"

3.2 Qualit de llectricit


Pourquoi utiliser souvent lexpression anglaise power quality ? On rencontre nombre de traductions franaises de cette expression mais aucune ne fait vraiment lunanimit : qualit de lalimentation, qualit de la tension, qualit du courant, qualit de londe, qualit de la fourniture, qualit du produit, qualit de lnergie lectrique, qualit de llectricit Il est remarquer que la traduction littrale qualit de la puissance nest jamais utilise, sans doute parce que lexpression originale power quality na pas beaucoup de sens. Selon lIEEE (Institute of Electrical and Electronics Engineers, association amricaine d'ingnieurs lectriciens couverture mondiale.), on appelle power quality problem toute variation dans lalimentation en puissance lectrique, ayant pour consquence le dysfonctionnement ou lavarie dquipements des utilisateurs, telle que : creux de tension, surtension, transitoire, fluctuations de tension, harmoniques, dsquilibre... Cependant, tous ces phnomnes affectent essentiellement la tension qui est fournie lutilisateur. Si ce dernier nutilise pas de charge perturbatrice, le courant sera peut-tre dform, mais uniquement dune manire qui rsulte des caractristiques de la tension fournie. Cest pourquoi on dit parfois que la qualit de l'lectricit se rduit la qualit de la tension (power quality = voltage quality). Cependant, l'expression power quality sentend gnralement dans une acception plus large : elle recouvre aussi le concept de "continuit de la tension" (ou "fiabilit de l'alimentation"). On ne peut videmment parler de qualit de la tension que lorsque la tension est prsente. En cas dinterruption de la tension (brve ou longue selon que la dure est infrieure ou suprieure 3 min), cest dun problme de continuit de la tension (fiabilit de lalimentation) quil faut parler : lalimentation est dautant plus fiable que le nombre annuel dinterruptions est petit et que leur dure moyenne est faible.Lquation correspondant linterprtation la plus correcte est donc : Qualit de lElectricit = Continuit + Qualit de la Tension

T.M.U

| ENIM

24

[RAPPORT DE STAGE] 15 septembre 2011

4. MISE EN PLACE DUN TABLEAU DE BORD DE


MAINTENANCE

CHEK-LIST (Postes Electriques)


1. Travaux dentretien avec coupure :
Sassurer des conditions scuritaires du travail Dcharger le cble MT Nettoyer les bornes MT et BT des transformateurs Contrler le niveau dilectrique du transformateur Nettoyer la cuve des transformateurs Vrifier et resserrer toutes les connexions lectriques Vrifier les protections MT et BT Vrifier ltanchit, liminer les fuites dhuile si possible et raliser lappoint ventuel (en cas de fuite non rparable, procder au remplacement du transformateur) Mesurer les isolements MT et BT du transformateur (une fois par an) Nettoyer les isolateurs support du jeu de barres Nettoyer les cellules transformateur, arrive et dpart Nettoyer les boites dextrmit Contrler et entretenir les cellules prfabriques et vrifier ltat des rsistances chauffantes (vrifier lisolement, le jeu de barres, sassurer de linexistence des fuites du gaz SF6) Vrifier les verrouillages des cellules Vrifier et maintenir les interrupteurs du poste Vrifier et maintenir les prises de courant et lclairage du poste Vrifier et noter le rglage du disjoncteur du tableau de distribution, vrifier ltat des fusibles et sassurer de la disponibilit des fusibles de rechange Procder la vrification, au rglage et lentretien du tableau de lclairage public Vrifier ltat du gnie civil du poste et procder son badigeonnage intrieur et extrieur selon une frquence comprise entre 5 et 10 ans suivant son tat et remettre en bonne tat la plateforme du poste si
| ENIM 25

T.M.U

[RAPPORT DE STAGE] 15 septembre 2011

ncessaire Remplir la fiche de suivi de lentretien du poste MT/BT. Cette fiche est place au niveau du poste Etablir le rapport dintervention et le transmettre la hirarchie

2. Travaux dentretien sans coupure :


Constater ltat gnral du poste - Fissure gnie civil - Etanchit dgrade du GC - Vrifier ltat du badigeonnage - Dgradation de la galvanisation de la menuiserie mtallique dont la porte daccs - Remise en tat de la porte daccs (peinture notamment) - Serrures porte daccs dfectueuse Poste nettoyer

- Conduite deau pluviale dgrade Nettoyer laccs, lentourage et les arations du poste Vrifier : - Que la temprature dhuile est infrieure 70C - Que la pression interne de la cuve est infrieure 0.1 bar - Que le gaz est dgag ou que le niveau baisse - Labsence de fuite - La pollution des isolateurs - Les bruits anormaux - Ltat de la prise de terre
T.M.U | ENIM 26

[RAPPORT DE STAGE] 15 septembre 2011

Programme dentretien des moteurs moyenne puissance des groupes lectrognes


TOUS LES JOURS CONTROLER : - Le niveau de lhuile moteur - Le niveau de carburant PURGER : - Le sparateur carburant/eau - Les sdiments de rservoir de carburant INSPECTER : - Le niveau de carburant - Les fuites de carburant, deau et dhuile

- Le niveau du rfrigrant - Les voyants du panneau - Le ventilateur - Le niveau du rservoir de carburant - Tube de reniflard de carter-moteur - Tuyau dadmission dair

TOUTES LES SEMAINES

- Mettre lunit en charge pendant 30 minutes

T.M.U

| ENIM

27

[RAPPORT DE STAGE] 15 septembre 2011

TOUS LES 10 000 Km CONTROLER : - La densit de llectrolyte de la batterie - Le serrage des boulons de fixation et des supports antivibratoires EFFECTUER : - La vidange de lhuile moteur - Le remplacement du filtre dhuile moteur INSPECTER : - Le circuit dair

- Lpurateur dair

- Le systme dadmission - Le refroidisseur dair introduit - Obstruction du filtre dair - Serrage des connexions lectriques

TOUS LES 19 000 Km CONTROLER : - La concentration de lantigel PURGER : - Les sparateurs deau de lchappement - Tuyau dalimentation en carburant - Pompe dinjection REMPLACER : - Le filtre de carburant - Le filtre de rfrigrant - Dpoussirer le gnrateur

T.M.U

| ENIM

28

[RAPPORT DE STAGE] 15 septembre 2011

TOUS LES 38 000 Km

CONTROLER : La tension de la courroie d ventilateur Le galet tendeur de la courroie du ventilateur Le moyeu du ventilateur Le turbocompresseur Le rchauffeur du rfrigrant Les dtecteurs de protection larrt Le rchauffeur du logement du gnrateur

AJUSTER : - Le jeu de fouettement des soupapes du moteur - Dposer, nettoyer et ajuster le capteur magntique

TOUS LES 48 000 Km

CONTROLER : - Le refroidisseur de lair

- Lamortisseur de vibrations - Le compresseur dair

REMPLACER : - Lantigel et purger le systme de refroidissement - La crpine de carburant

AJUSTER Le jeu des soupapes

T.M.U

| ENIM

29

[RAPPORT DE STAGE] 15 septembre 2011

4 . PROPOSITIONS :
Lors de notre avancement dans ltude du projet nous sommes arrivs ltape de lanalyse AMDEC, ce qui est avr impossible cause de labsence de tout document contenant lhistorique des interventions, et par ce que Tanger Med Utilities est une entreprise rcemment cre avec des quipements tout neufs. Donc nous avons proposs : - des fiches dans lesquelles les techniciens et les agents de maitrise vont noter toutes les interventions. Ces fiches vont servir par suite une prochaine tude AMDEC. - Une application sur VB.Net qui va contenir toutes les informations sur chaque quipement ainsi que les interventions.

V. Conclusion
Ce stage a t une opportunit de contacter le monde professionnel, pour pouvoir complter ainsi notre savoir acquis pendant notre formation. Du coup, nous pourrons faire une approche de nos connaissances thoriques avec les ralits du

fonctionnement de la socit.
Il a t aussi pour nous loccasion pour dcouvrir le monde de travail en tenant compte de ses exigences, ses horaires et ses mthodes. En dfinitive, pour ne rien enlever aux bnfices de ce stage laspect humain a t mis en avant, et ce grce au dialogue, et aux conseils des personnes qui nous ont donn le recul ncessaire tout au long du stage.

T.M.U

| ENIM

30

[RAPPORT DE STAGE] 15 septembre 2011

ANNEXES

T.M.U

| ENIM

31

[RAPPORT DE STAGE] 15 septembre 2011

FICHES DE LHISTORIQUE DES INTERVANTION

TRANSFORMATEUR
Marque : Puissance : . ..... KVA Couplage : . V A

Srie N:
.. % Enroulement : . /. Kg

Anne de fabrication : .. Ucc :

Tension primaire : ... Courant primaire :

Tension secondaire : V Masse huile : Courant primaire : . A . W Masse Totale : Pertes Joules:

. Kg W INTERVENANT

Date de mise sous tension: Pertes vide: DATE D'INTERVENTION

TYPE D'INTERVENTION

DUREE DINTERVENTION

T.M.U

| ENIM

32

[RAPPORT DE STAGE] 15 septembre 2011

CELLULE ARRIVEE
Marque : MERLIN GERIN Ur : Ir : tk : .. . ... KV A s Anne de fabrication : 2006 Ud : Ik : SF6 : .. .. KV A Kg

Srie N:
Fr : 50/60 Hz Up : Ip : Pre : . KV KA Kpa

DATE D'INTERVENTION

TYPE D'INTERVENTION

DUREE DINTERVENTION

INTERVENANT

T.M.U

| ENIM

33

[RAPPORT DE STAGE] 15 septembre 2011

CELLULE DEPART
Marque : MERLIN GERIN Ur : Ir : tk : .. . ... KV A s Anne de fabrication : 2006 Ud : Ik : SF6 : .. .. KV A Kg

Srie N:
Fr : 50/60 Hz Up : Ip : Pre : . KV KA Kpa

DATE D'INTERVENTION

TYPE D'INTERVENTION

DUREE DINTERVENTION

INTERVENANT

T.M.U

| ENIM

34

[RAPPORT DE STAGE] 15 septembre 2011

CELLULE INTERRUPTEUR
Marque : MERLIN GERIN Ur : Ir : tk : .. . ... KV A s Anne de fabrication : 2006 Ud : Ik : SF6 : .. .. KV A Kg

Srie N:
Fr : 50/60 Hz Up : Ip : Pre : . KV KA Kpa

DATE D'INTERVENTION

TYPE D'INTERVENTION

DUREE DINTERVENTION

INTERVENANT

T.M.U

| ENIM

35

[RAPPORT DE STAGE] 15 septembre 2011

CELLULE TRANSFO
Marque : MERLIN GERIN Ur : Ir : tk : .. . ... KV A s Anne de fabrication : 2006 Ud : Ik : SF6 : .. .. KV A Kg

Srie N:
Fr : 50/60 Hz Up : Ip : Pre : . KV KA Kpa

DATE D'INTERVENTION

TYPE D'INTERVENTION

DUREE DINTERVENTION

INTERVENANT

T.M.U

| ENIM

36

[RAPPORT DE STAGE] 15 septembre 2011

CELLULE MESURE
Marque : MERLIN GERIN Ur : Ir : tk : .. . ... KV A s Anne de fabrication : 2006 Ud : Ik : SF6 : .. .. KV A Kg

Srie N:
Fr : 50/60 Hz Up : Ip : Pre : . KV KA Kpa

DATE D'INTERVENTION

TYPE D'INTERVENTION

DUREE DINTERVENTION

INTERVENANT

T.M.U

| ENIM

37

[RAPPORT DE STAGE] 15 septembre 2011

CELLULE COUPLAGE
Marque : MERLIN GERIN Ur : Ir : tk : .. . ... KV A s Anne de fabrication : 2006 Ud : Ik : SF6 : .. .. KV A Kg

Srie N:
Fr : 50/60 Hz Up : Ip : Pre : . KV KA Kpa

DATE D'INTERVENTION

TYPE D'INTERVENTION

DUREE DINTERVENTION

INTERVENANT

T.M.U

| ENIM

38

[RAPPORT DE STAGE] 15 septembre 2011

CELLULE GAINE BARRES


Marque : MERLIN GERIN Ur : Ir : tk : .. . ... KV A s Anne de fabrication : 2006 Ud : Ik : SF6 : .. .. KV A Kg

Srie N:
Fr : 50/60 Hz Up : Ip : Pre : . KV KA Kpa

DATE D'INTERVENTION

TYPE D'INTERVENTION

DUREE DINTERVENTION

INTERVENANT

T.M.U

| ENIM

39

[RAPPORT DE STAGE] 15 septembre 2011

GENIE CIVIL
DATE D'INTERVENTION TYPE D'INTERVENTION

Poste : .
DUREE DINTERVENTION

INTERVENANT

T.M.U

| ENIM

40

[RAPPORT DE STAGE] 15 septembre 2011

TABLEAU BT
DATE D'INTERVENTION TYPE D'INTERVENTION

Poste : .
INTERVENANT

T.M.U

| ENIM

41

[RAPPORT DE STAGE] 15 septembre 2011

EQUIPEMENT DE SECURITE
DATE D'INTERVENTION TYPE D'INTERVENTION

Poste : .
INTERVENANT

T.M.U

| ENIM

42

[RAPPORT DE STAGE] 15 septembre 2011

TELECONDUITE
DATE D'INTERVENTION TYPE D'INTERVENTION

Poste : .

INTERVENANT

T.M.U

| ENIM

43

[RAPPORT DE STAGE] 15 septembre 2011

TABLEAU ECLAIRAGE PUBLIC Poste : .


DATE D'INTERVENTION TYPE D'INTERVENTION INTERVENANT

T.M.U

| ENIM

44

[RAPPORT DE STAGE] 15 septembre 2011

VI. REFERENCES
Sminaire sur la Qualit de lElectricit 08/12/2010 Guide de la maintenance Catalogue et notices des quipements MERLIN GERIN Wikipdia DUNOD : Pratique de la maintenance prventive