You are on page 1of 2

Availability Check for Y8 PP Rule Plz check the setting that is maintained for Y8 - PP rule, here we can see

Include Safety Stock Check box is ticked, this means that the system considers the safety stock as available stock for availability check.

Hence the safety stock of 150 will not get reduced while checking availability for the material 2T235531020, therefore your requirement falls on 19.01.2012

At this point stock is available, plz check.

You might also like