DISEO LINEA DE CONDUCCION

OBRA:

AMPLIACIN SISTEMA DE AGUA POTABLE COMUNIDAD VILACHAVE

Qmd =
Cota Captacion =
Cota Reservorio =
Longitud Tramo =
C=

0.31 l/Seg
4380 m.s.n.m.
4330 m.s.n.m.
641.00 m
=
140

0.641 Km

PENDIENTE DISPONIBLE:

78.00

DIAMETRO DE TUBERIA:

= 0.0004264 2.63* 0.54


=

0.0004264 0.54

2.63

0.76 Pulg

1.00 Pulg

VERIFICANDO LA VELOCIDAD:

= (m/s)

0.61 m/seg

LUEGO DIAMETRO DE LA TUBERIA ES DE:

1.00 Pulg

VERIFICANDO DE NUEVO PENDIENTE DE DISEO:


=

0.54

0.0004264 2.63

78.00

>

Perdida de carga en el Tramo:

21.13

21.13

Hf =

0.02113

13.54 m

EL REGIMEN DE TRABAJO ES A TUBO LLENO:


CALCULO DE CLASE DE TUBERIA:

0.70

71.10 lb/Plg2

72.00 Lb/Pulg
50.63 m.c.a.

Cota Piezometrica Reservorio = Cota Terreno Capt - Hf


=
Luego Usamos:

TUBERIA CLASE:

4,366.46
36.46 m.c.a.
7.5

4390
0, 4,380

NIVEL DE CARGA ESTATICA

4380
0, 4380

Hf = 13.54 m

641, 4,366

4370
100, 4370
4360
200, 4358
4350

PRESION = 36.46 m

300, 4350

4340

400, 4343

500, 4338
600, 4334

4330

641, 4330

4320
0

100

200
L.G.H.

300

400

Perfil de Terreno

500

600

Linear (L.G.H.)

700