You are on page 1of 12

Estacin:

Departamento:
Provincia:

Bolivar
Cochabamba
Arque

DATOS DE : PRECIPITACIN TOTAL (mm)


AO

ENE

FEB

1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978

****
185.2
104.5
45.0
72.9
111.6
167.1
72.8
109.2
43.9
159.1
1071.3
107.1

****
107.5
170.1
100.7
72.0
42.9
130.1
44.5
51.8
83.3
179.8
982.7
98.3

SUMA
MEDIA

MAR

ABR

MAY

JUN

****

****

****

****

75.9
29.6
9.6
43.0
42.4
36.4
13.2
49.7
116.0
69.4
485.2
48.5

41.0
9.0
1.5
0.4
1.0
11.0
3.7
0.3
12.1
37.4
117.4
11.7

0.2
4.0
0.0
0.3
8.1
0.0
0.6
0.6
0.7
38.2
52.7
5.3

JUL
****
0.0
0.0
8.0
0.0
0.0
0.0
0.6
0.0
0.0
0.0
8.6
0.9

0.0
7.0
0.2
0.0
1.8
0.0
0.0
11.7
22.4
0.0
43.1
4.3

DATOS DE : PRECIPITACIN MXIMA EN 24 Hrs. (mm


AO

ENE

FEB

MAR

ABR

MAY

JUN

1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978

****

****

****

****

****

****

MAX

23.5
35.0
8.0
12.0
15.4
20.0
12.0
16.0
20.0
35.4
35.4

22.0
75.0
20.0
17.3
16.0
20.0
9.0
20.0
15.0
31.0
75.0

17.0
7.3
5.0
15.2
20.0
8.1
4.0
20.0
20.8
17.0
20.8

17.4
3.2
1.5
0.4
0.6
8.0
3.0
0.3
8.7
9.3
17.4

0.2
2.5
0.0
0.3
7.6
0.0
0.6
0.6
0.7
8.9
8.9

JUL
****
0.0
0.0
4.0
0.0
0.0
0.0
0.6
0.0
0.0
0.0
4.0

0.0
5.0
0.2
0.0
1.8
0.0
0.0
8.3
8.3
0.0
8.3

Latitud Sud:
Longitud Oeste:
Altura m/s/n/m:

17 58' 00"
66 24' 00"
2820

CIN TOTAL (mm)


AGO

SEP

OCT

****

****

****

0.3
0.0
0.4
0.0
7.4
14.0
0.0
0.8
10.6
7.0
40.5
4.0

0.7
13.0
0.4
1.6
0.8
0.3
3.4
26.5
17.0
5.9
69.6
7.0

NOV
80.5
25.4
5.0
31.7
24.9
8.0
35.2
20.9
37.6

15.2
12.8
6.3
5.2
20.3
23.0
5.3
0.0
****

****

43.0
131.1
14.6

54.1
323.3
32.3

DIC

ANUAL

108.5
23.5
29.5
50.5
137.6
53.8
26.3
88.3
44.6
193.3
124.0
879.9
80.0

****
474.9
384.5
254.3
357.9
298.1
443.4
253.3
332.8
****
717.9
3517.1
390.8

MXIMA EN 24 Hrs. (mm)


AGO

SEP

OCT

****

****

****

0.3
0.0
0.4
0.0
7.0
13.4
0.0
0.8
6.5
4.5
13.4

0.5
11.0
0.4
0.9
0.8
0.3
3.0
10.0
9.0
3.5
11.0

NOV
13.5
8.9
5.0
9.0
11.4
5.0
15.0
18.0
13.2

15.0
5.0
2.2
5.0
8.3
11.0
5.0
0.0
****

****
11.5
15.0

20.0
20.0

DIC

ANUAL
41.3
7.0
7.0
14.0
22.0
14.0
7.1
19.4
19.4
27.0
18.3
41.3

41.3
23.5
75.0
20.0
22.0
20.0
20.0
19.4
20.0
27.0
35.4
75.0

HIDROLOGA
MEMORIA DE CALCULO
En este acpite se determinan los caudales de las cuencas y subcuencas por el mtodo racional.
Debido a la falta de pluvigrafos en las estaciones prximas al sitio de proyecto, que permitan
una determinacin directa de las curvas de intensidad - duracin - frecuencia, se trabaj sobre la
base de registros de mximas precipitaciones diarias.
ESTIMACION DE LA PRECIPITACION MAXIMA PROBABLE
La precipitacin mxima probable es aquella magnitud de lluvia que ocurre sobre una cuenca
particular, en la cual generar un gasto de avenida, para el que virtualmente no existe riesgo de
ser excedido.
Los diversos procedimientos de estimacin de la precipitacin mxima probable no estn
normalizados, ya que varan principalmente con la cantidad y calidad de los datos disponibles;
adems, cambian con el tamao de la cuenca, su emplazamiento y su topografa, con los tipos
de temporales que producen las precipitaciones extremas y con el clima. Los mtodos de
estimacin de fcil y rpida aplicacin son los empricos y el estadstico.

Aunque existe un nmero importante de distribuciones de probabilidad empleadas en hidrologa,


son slo unas cuantas las comunmente utilizadas, debido a que los datos hidrolgicos de
diversos tipos han probado en repetidas ocasiones ajustarse satisfactoriamente a un cierto
modelo terico. Las lluvias mximas horarias o diarias por lo comn se ajustan bien a la
distribucin de valores extremos tipo I o Gumbel, a la Log-Pearson tipo III y a la gamma
incompleta. En este proyecto se emple la distribucin Gumbel.

Se trabajar con la serie anual de mximos correspondiente a la estacin Bolivar.

Registros pluviomtricos Estacin Bolivar - Mtodo Gumbel

No

Ao

1
2
3
4
5
6
7
8
9
10
11

1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978

Mes
Max. Precip.

DIC
ENE
FEB
FEB
DIC
MAR
FEB
DIC
FEB
DIC
ENE
Suma

x=

(x
n

S=

i =1

323.6

2805.74

29.42

mm

16.75

mm

*s =

13.06

mm

21.88

mm

- x)

n -1

a=

u = x - 0.5772 * a =
Para el modelo de probabilidad:

Precipitacin (mm)
xi
(xi - x)^2
41.3 141.18
35.02
23.5
75.0 2077.70
88.70
20.0
55.03
22.0
88.70
20.0
88.70
20.0
19.4 100.36
88.70
20.0
5.85
27.0
35.78
35.4

x -u
-

-e a

F(x) = e

Segn el estudio de miles de estaciones - ao de datos de lluvia, realizado por L. L. Welss, los resultados de
un anlisis probabilstico llevado a cabo con lluvias mximas anuales tomadas en un nico y fijo intervalo de
observacin, al ser incrementados en un 13% conducan a magnitudes ms aproximadas a las obtenidas en
el anlisis basado en lluvias mximas verdaderas. Por tanto el valor representativo adoptado para la cuenca
ser multiplicado por 1.13 para ajustarlo por intervalo fijo y nico de observacin.

Clculo de las lminas para distintas frecuencias


Fuente: Elaboracin propia
Periodo

Variable

Precip.

Prob. de

Correccin

Retorno

Reducida

(mm)

ocurrencia

intervalo fijo

Aos

YT

XT'(mm)

F(xT)

XT (mm)

2
5
10
25
50
75
100

0.3665
1.4999
2.2504
3.1985
3.9019
4.3108
4.6001

26.6666
41.4693
51.2700
63.6533
72.8399
78.1795
81.9586

0.5000
0.8000
0.9000
0.9600
0.9800
0.9867
0.9900

30.1332
46.8603
57.9352
71.9282
82.3091
88.3428
92.6132

ECUACIN DE INTENSIDAD
Las relaciones o cocientes a la lluvia de 24 horas se emplean para duraciones de varias horas. D. F.
Campos A. propone los siguientes cocientes:
Valores concluidos para las relaciones a la lluvia de duracin 24 horas
Fuente: D. F. Campos A., 1978
Duraciones, en horas
1
0.30

2
0.39

3
0.46

4
0.52

5
0.57

6
0.61

8
0.68

12
0.80

18
0.91

24
1.00

Estos datos sern obtenidos como un porcentaje de los resultados de la precipitacin mxima
probable para 24 horas, para cada perodo de retorno, diferentes porcentajes de este valor segn
los tiempos de duracin de lluvia adoptados.
Tabla 7.7 - Precipitaciones mximas para diferentes tiempos de duracin de lluvias
Fuente: Elaboracin propia
Tiempo de
Duracin
24 hr
18 hr
12 hr
8 hr
6 hr
5 hr
4 hr
3 hr
2 hr
1 hr

P.M.P. (mm) para diferentes tiempos de duracin Sg. Periodo de Retorno


2 aos 5 aos
10 aos 25 aos 50 aos
75 aos
100 aos 500 aos
X24
30.1332 46.8603 57.9352 71.9282 82.3091 88.3428
92.6132
116.4247
X18 = 91% 27.4212 42.6429 52.7210 65.4547 74.9012 80.3919
84.2781
105.9464
X12 = 80% 24.1066 37.4883 46.3481 57.5426 65.8472 70.6742
74.0906
93.1397
X8 = 68% 20.4906 31.8650 39.3959 48.9112 55.9702 60.0731
62.9770
79.1688
X6 = 61% 18.3813 28.5848 35.3404 43.8762 50.2085 53.8891
56.4941
71.0190
X5 = 57% 17.1759 26.7104 33.0230 40.9991 46.9162 50.3554
52.7896
66.3621
X4 = 52% 15.6693 24.3674 30.1263 37.4027 42.8007 45.9383
48.1589
60.5408
X3 = 46% 13.8613 21.5558 26.6502 33.0870 37.8622 40.6377
42.6021
53.5553
X2 = 39% 11.7520 18.2755 22.5947 28.0520 32.1005 34.4537
36.1192
45.4056
X1 = 30% 9.0400 14.0581 17.3805 21.5785 24.6927 26.5028
27.7840
34.9274
Cociente

Basndose en los resultados de la anterior tabla, y los tiempos de duracin adoptados, calculamos
la intensidad equivalente para cada caso, segn:
Pmm
I =
t duracin hr.

Intensidades de lluvia para diferentes tiempos de duracin


Fuente: Elaboracin propia
Tiempo de duracin
Hr
min
24 hr
1440
18 hr
1080
12 hr
720
8 hr
480
6 hr
360
5 hr
300
4 hr
240
3 hr
180
2 hr
120
1 hr
60

2 aos
1.2556
1.5234
2.0089
2.5613
3.0635
3.4352
3.9173
4.6204
5.8760
9.0400

Intensidad de la lluvia (mm /hr) segn el Periodo de Retorno


5 aos 10 aos 25 aos
50 aos
75 aos
100 aos
1.9525
2.4140
2.9970
3.4295
3.6809
3.8589
2.3691
2.9289
3.6364
4.1612
4.4662
4.6821
3.1240
3.8623
4.7952
5.4873
5.8895
6.1742
3.9831
4.9245
6.1139
6.9963
7.5091
7.8721
4.7641
5.8901
7.3127
8.3681
8.9815
9.4157
5.3421
6.6046
8.1998
9.3832
10.0711
10.5579
6.0918
7.5316
9.3507
10.7002
11.4846
12.0397
7.1853
8.8834 11.0290 12.6207
13.5459
14.2007
9.1378 11.2974 14.0260 16.0503
17.2268
18.0596
14.0581 17.3805 21.5785 24.6927
26.5028
27.7840

La representacin matemtica de las curvas Intensidad - Duracin - Perodo de retorno, Sg. Bernard es:

I =

a *T b
tc

en la cual:
I=
t=
T=
a,b,c =

Intensidad (mm/hr)
Duracin de la lluvia (min)
Perodo de retorno (aos)
Parmetros de ajuste

d = a *T b

Realizando un cambio de variable:

De donde:

I=

N
1
2
3
4
5
6
7
8
9
10
10

x
1440
1080
720
480
360
300
240
180
120
60
4980

Ln (A) =

4.7355

y
1.2556
1.5234
2.0089
2.5613
3.0635
3.4352
3.9173
4.6204
5.8760
9.0400
37.3016

d
I = d * t -c
c
t
Periodo de retorno para T = 2 aos
ln x
ln y
ln x*ln y
(lnx)^2
7.2724
0.2276
1.6550
52.8878
6.9847
0.4209
2.9402
48.7863
6.5793
0.6976
4.5895
43.2865
6.1738
0.9405
5.8066
38.1156
5.8861
1.1196
6.5899
34.6462
5.7038
1.2341
7.0389
32.5331
5.4806
1.3654
7.4833
30.0374
5.1930
1.5305
7.9478
26.9668
4.7875
1.7709
8.4780
22.9201
4.0943
2.2017
9.0143
16.7637
58.1555 11.5087 61.5436
346.9435

A = 113.9194

B=

-0.6164

N
1
2
3
4
5
6
7
8
9
10
10

x
1440
1080
720
480
360
300
240
180
120
60
4980

Ln (A) =

5.1770

N
1
2
3
4
5
6
7
8
9
10
10

x
1440
1080
720
480
360
300
240
180
120
60
4980

Ln (A) =

5.3892

N
1
2
3
4
5
6
7
8
9
10
10

x
1440
1080
720
480
360
300
240
180
120
60
4980

Ln (A) =

5.6055

y
1.9525
2.3691
3.1240
3.9831
4.7641
5.3421
6.0918
7.1853
9.1378
14.0581
58.0079

Periodo de retorno para T = 5 aos


ln x
ln y
ln x*ln y
(lnx)^2
7.2724
0.6691
4.8661
52.8878
6.9847
0.8625
6.0242
48.7863
6.5793
1.1391
7.4946
43.2865
6.1738
1.3821
8.5326
38.1156
5.8861
1.5611
9.1889
34.6462
5.7038
1.6756
9.5573
32.5331
5.4806
1.8070
9.9032
30.0374
5.1930
1.9720
10.2407
26.9668
4.7875
2.2124
10.5919
22.9201
4.0943
2.6432
10.8222
16.7637
58.1555 15.9241 87.2217
346.9435

A = 177.1567

y
2.4140
2.9289
3.8623
4.9245
5.8901
6.6046
7.5316
8.8834
11.2974
17.3805
71.7173

-0.6164

Periodo de retorno para T = 10 aos


ln x
ln y
ln x*ln y
(lnx)^2
7.2724
0.8813
6.4090
52.8878
6.9847
1.0746
7.5061
48.7863
6.5793
1.3513
8.8904
43.2865
6.1738
1.5942
9.8424
38.1156
5.8861
1.7733
10.4376
34.6462
5.7038
1.8878
10.7674
32.5331
5.4806
2.0191
11.0660
30.0374
5.1930
2.1842
11.3424
26.9668
4.7875
2.4246
11.6076
22.9201
4.0943
2.8554
11.6908
16.7637
58.1555 18.0457 99.5596
346.9435

A = 219.0253

y
2.9970
3.6364
4.7952
6.1139
7.3127
8.1998
9.3507
11.0290
14.0260
21.5785
89.0391

B=

B=

-0.6164

Periodo de retorno para T = 25 aos


ln x
ln y
ln x*ln y
(lnx)^2
7.2724
1.0976
7.9823
52.8878
6.9847
1.2910
9.0172
48.7863
6.5793
1.5676
10.3138
43.2865
6.1738
1.8106
11.1780
38.1156
5.8861
1.9896
11.7111
34.6462
5.7038
2.1041
12.0014
32.5331
5.4806
2.2354
12.2517
30.0374
5.1930
2.4005
12.4658
26.9668
4.7875
2.6409
12.6433
22.9201
4.0943
3.0717
12.5766
16.7637
58.1555 20.2091 112.1412 346.9435

A = 271.9264

B=

-0.6164

N
1
2
3
4
5
6
7
8
9
10
10

x
1440
1080
720
480
360
300
240
180
120
60
4980

Ln (A) =

5.7403

N
1
2
3
4
5
6
7
8
9
10
10

x
1440
1080
720
480
360
300
240
180
120
60
4980

Ln (A) =

5.8111

N
1
2
3
4
5
6
7
8
9
10
10

x
1440
1080
720
480
360
300
240
180
120
60
4980

Ln (A) =

5.8583

N
1
2
3
4
5

x
1440
1080
720
480
360

Periodo de retorno para T = 50 aos


y
ln x
ln y
ln x*ln y
(lnx)^2
3.4295
7.2724
1.2324
8.9627
52.8878
4.1612
6.9847
1.4258
9.9588
48.7863
5.4873
6.5793
1.7024
11.2007
43.2865
6.9963
6.1738
1.9454
12.0103
38.1156
8.3681
5.8861
2.1244
12.5046
34.6462
9.3832
5.7038
2.2389
12.7703
32.5331
10.7002 5.4806
2.3703
12.9905
30.0374
12.6207 5.1930
2.5353
13.1659
26.9668
16.0503 4.7875
2.7757
13.2888
22.9201
24.6927 4.0943
3.2065
13.1285
16.7637
101.8895 58.1555 21.5572 119.9813 346.9435
A = 311.1714

B=

-0.6164

Periodo de retorno para T = 75 aos


y
ln x
ln y
ln x*ln y
(lnx)^2
3.6809
7.2724
1.3032
9.4772
52.8878
4.4662
6.9847
1.4965
10.4529
48.7863
5.8895
6.5793
1.7732
11.6662
43.2865
7.5091
6.1738
2.0161
12.4471
38.1156
8.9815
5.8861
2.1952
12.9210
34.6462
10.0711 5.7038
2.3097
13.1738
32.5331
11.4846 5.4806
2.4410
13.3783
30.0374
13.5459 5.1930
2.6061
13.5333
26.9668
17.2268 4.7875
2.8465
13.6274
22.9201
26.5028 4.0943
3.2773
13.4182
16.7637
109.3586 58.1555 22.2647 124.0954 346.9435
A = 333.9822

B=

-0.6164

Periodo de retorno para T = 100 aos


y
ln x
ln y
ln x*ln y
(lnx)^2
3.8589
7.2724
1.3504
9.8205
52.8878
4.6821
6.9847
1.5437
10.7827
48.7863
6.1742
6.5793
1.8204
11.9768
43.2865
7.8721
6.1738
2.0633
12.7385
38.1156
9.4157
5.8861
2.2424
13.1989
34.6462
10.5579 5.7038
2.3569
13.4431
32.5331
12.0397 5.4806
2.4882
13.6370
30.0374
14.2007 5.1930
2.6533
13.7784
26.9668
18.0596 4.7875
2.8937
13.8535
22.9201
27.7840 4.0943
3.3245
13.6115
16.7637
114.6449 58.1555 22.7367 126.8408 346.9435
A = 350.1267

y
4.8510
5.8859
7.7616
9.8961
11.8365

B=

-0.6164

Periodo de retorno para T = 500 aos


ln x
ln y
ln x*ln y
(lnx)^2
7.2724
1.5792
11.4845
52.8878
6.9847
1.7726
12.3808
48.7863
6.5793
2.0492
13.4822
43.2865
6.1738
2.2921
14.1512
38.1156
5.8861
2.4712
14.5457
34.6462

6
7
8
9
10
10

300
240
180
120
60
4980

Ln (A) =

6.0871

13.2724 5.7038
2.5857
15.1352 5.4806
2.7170
17.8518 5.1930
2.8821
22.7028 4.7875
3.1225
34.9274 4.0943
3.5533
144.1208 58.1555 25.0249
A = 440.1464

B=

14.7482
14.8910
14.9666
14.9489
14.5483
140.1474
-0.6164

32.5331
30.0374
26.9668
22.9201
16.7637
346.9435

Resumen de aplicacin de regresin potencial


Periodo de
Trmino ctte. de
Coef. de
Retorno (aos)
regresin (d)
regresin [ c ]
2
113.91941604330
-0.6163860881
5
177.15672001137
-0.6163860881
10
219.02531769761
-0.6163860881
25
271.92640186568
-0.6163860881
50
311.17144811585
-0.6163860881
75
333.98216522974
-0.6163860881
100
350.12671510483
-0.6163860881
500
440.14639029154
-0.6163860881
Promedio =
277.18182179499
-0.6163860881
I
I

d
=
c
t

d
d
*
c
t

En funcin del cambio de variable realizado, se realiza otra regresin de potencia entre las columnas del
periodo de retorno (T) y el trmino constante de regresin (d) , para obtener valores de la ecuacin:

d = a *T b

N
1
2
3
4
5
6
7
8
8

x
2
5
10
25
50
75
100
500
767

Ln (A) =

4.7559

y
113.9194
177.1567
219.0253
271.9264
311.1714
333.9822
350.1267
440.1464
2217.4546

ln x
ln y
0.6931
4.7355
1.6094
5.1770
2.3026
5.3892
3.2189
5.6055
3.9120
5.7403
4.3175
5.8111
4.6052
5.8583
6.2146
6.0871
26.8733 44.4041

A = 116.2736

B=

Regresin potencial
ln x*ln y
(lnx)^2
3.2824
0.4805
8.3321
2.5903
12.4091
5.3019
18.0435
10.3612
22.4564
15.3039
25.0893
18.6407
26.9784
21.2076
37.8290
38.6214
154.4202 112.5074
0.2365

Termino constante de regresin (a) = 116.2736


Coef. de regresin (b) = 0.236536

Finalmente se tiene la ecuacin de intensidad vlida para la cuenca:


0.236536

I=

116.2736

* T
0.61639

Donde:
I = intensidad de precipitacin (mm/hr)
T = Periodo de Retorno (aos)
t = Tiempo de duracin de precipitacin (min)

Intensidad - Tiempo de duracin - Perodo de retorno


Fuente: Elaboracin propia
Tabla de intensidad - Tiempo de duracin - Periodo de retorno
Frecuencia
aos

10

2
5
10
25
50
75
100
500

50.80
63.09
74.33
92.32
108.77
119.72
128.15
187.52

33.14
41.16
48.49
60.22
70.95
78.09
83.59
122.32

Duracin en minutos
15
20

25.81
32.05
37.77
46.90
55.26
60.82
65.11
95.27

21.61
26.85
31.63
39.28
46.28
50.94
54.53
79.79

t
t
c
c

25

30

18.84
23.40
27.56
34.24
40.33
44.39
47.52
69.54

16.83
20.91
24.63
30.60
36.05
39.68
42.47
62.15

0.77
0.019
5
*m
L
L

=
0 .3
=
1
/
4

0.385
S

0 . 76

Tabla de intensidad - Tiempo de duracin - Periodo de retorno (continuacin...)


Frecuencia
aos

35

40

45

50

55

60

2
5
10
25
50
75
100
500

15.31
19.01
22.40
27.82
32.78
36.08
38.62
56.51

14.10
17.51
20.63
25.62
30.19
33.23
35.57
52.05

13.11
16.29
19.19
23.83
28.08
30.90
33.08
48.40

12.29
15.26
17.98
22.33
26.31
28.96
31.00
45.36

11.59
14.39
16.95
21.06
24.81
27.31
29.23
42.77

10.98
13.64
16.07
19.96
23.51
25.88
27.70
40.54

200.00
Ao 500

INTENSIDAD (mm/h)

175.00
150.00

Ao 100
125.00

Ao 75
Ao 50

100.00

Ao 25

400

Ao 10
Ao 5
Ao 2

75.00
50.00
25.00
0.00
0

10

15

20

25

30

35

TIEMPO DE DURACION (min)

Tabla de intensidades - Tiempo de duracin

40

45

50

55

60

You might also like