A Repot on Preparatory Study 1. 2.

Title of the Cooperation Project The Project for Improvement of Water Supply in Abbottabad in the Islamic Republic Pakistan Categorization and its reason 2.1 Category: B 2.2 Reason This project aims to supply safe and stable water by means of taking surface water from valleys located in the east of Abbottabad city for residents of Abbottabad TMA, Nawanshehr Service Union and its adjoining four Union Councils and will be conducted through Japans Grant Aid scheme. With expanding and newly- installing water supply systems including establishment of new wells, unexpected influences on natural and social environment such as issues of land acquisition, a conflict of water right and so on will arise. Therefore, this project is classified in Category B. 3. Outline of the Location District Abbottabad is center of Hazara Division, which is located in a valley and situated between 33 50 and 34 23 North, and 73 35and 73 31 East at an altitude of 4120 feet (1250 m) above sea level. It is located in the place about 2.5 hours (100km of distance) by a car from Islamabad which is the capital of the Pakistan and about 3 hours (205km of distance) by a car from Peshawar which is the capital of NWFP. The monthly average lowest temperature is 1.8 C in January and 20.1 C in July. The monthly average maximum temperature is 12.6 C in January and 32.4 C in June. Precipitation in Abbottabad varies annually. Average monthly precipitation during 1961 to 2002, the maximum monthly precipitation is recorded in August (259mm), and the minimum monthly precipitation is recorded in November (30mm). Population of the target area was 151,875 at Census in 1998. population will be estimated 205,120 and 234,970 respectively. Jadoon is the main tribe inhabiting the project area. Other tribes include Syed, Awan, Sardar, Tanawali, Gugar and Abbassi. All the population is Muslim and belongs to Sunni Sect. Main language is Hindko spoken by majority of the population. Karakoram Highway passes through Abbottabad area to China from south to north, and Murree Road is provided eastwards, and is an important place in North-West Frontier Province. The rate of households of a gas supply through a gas pipeline network is very high as domestic fuel in Abbottabad area. Although electricity has spread through almost all homes, load-shedding is conducted about 4 to 5 hours a day. Although a sewage system was planned in 1985, it has not been in implementation due to the
1

At 2010 and 2015, the

shortage of funds etc, and has not been served. Therefore, much of domestic sewage of Abbottabad city is untreated, and is discharged into branches of the Dole River and so on.

To Mansehra
Abbottabad

Mirpur Derawandah Jhangi

Peshawar Islamabad

Lama Maira Dobathar

Banda Ghazan

Karakurram Highway

Kakul Cantonment

Kakul Road

Banda Phugwarian NewmanShahr Service Union Murree Road Shaekhal Bandi

Abbottabad TMA Dor River Google Earth Fig. Location of Target Area 2

Salhad To Islamabad and Peshawar

4.

Legal Framework of Environmental and Social Consideration the Pakistan Environmental Protection Act 1997 Pakistan Environment Protection Agency (Review of IEE and EIA)Regulations, 2000 the National Environmental Policy in 2005 National Environmental Action Plan (NEAP) Guidelines for the Preparation and Review of Environmental Reports Guidelines for Public Consultation Guidelines for Sensitive and Critical Areas

5. on

Outline of the Relevant Agencies and the Institution, which implements the Project, EIA and so The implementing agency is District Government Abbottabad under the Government of the NWFP. Operation and Maintenance of Gravity Water Supply will be carried out by new a proposed organization, i.e. Gravity Water Supply Unit, while O&M of Ground Water Supply System of 10 villages will be conducted by Water Supply and Sanitation/PHE of the District Government. Environmental administration of the province is carried out by the Environmental Protection Agency (EPA, NWFP). EPA NWFP was established in 1989 under the administrative control of PP&H Department. Later on, in 1992, it was transferred to PE&D Department the attached Department. Recently it has been placed under a newly established Environment Department.

6.

Outline of the Project, Analysis of Alternative


Without Project Selected Projects Gaya River, Bagh River and Namly Maira River: 200 l/s New 14.8 lit/s, Existing 88.5 lit/s A) Surface water system: Intake weir with Bar screen type; 4site B) Ground water system: Wells 250mm x depth 100m; 4 sites Replacement of existing well pumps; 12 sites 450500mm 11km 150300mm 10km Slow filtration system 400-500mm: 4.5km 100-300mm: 26 km Technical and management guidance for O&M of above mentioned Facilities A) The current water supply restriction will be eased. B) Improvement of O&M skill is expected. The O&M cost of the water supply system will be increased.

Selected Projects on the Basis of Previous B/D study and Comparative Examination of Alternatives
Source of Surface Water System Source of Wells Construction of Inlet facilities No Existing 129.1 lit/s No

Construction of Raw water transmission mains Construction of Water treatment plant Construction of Treated water transmission mains Soft Component Scheme Advantages Drawbacks

No No No No No environmental or social impacts are expected A) B) C) The current water supply restriction will not be eased, since the project will not be implemented. The current water supply will not meet demands of water at the target year. Some existing wells will be likely discarded.

7. Adverse Environmental and Social Impacts (Results of Scoping and Environmental and Social Consideration Studies) 7.1 Service Reservoirs
Item 1 Involuntary Resettlement Banda Ghazan Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated. Lama Maira Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated. Salhad Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated. Sheihkul Bandi Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated. Mirpur Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated. Nowanshehr Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated. Banada Phugwarian Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated. Dobathar Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated. Derawandanh Rating; Reason D The proposed construction site is the empty land. There are access roads to the site. There is no resident in these sites. D: No negative impact is generated.

Social Environment: *Impacts on Gender and Childrens Right may be related to all social environment criteria.

Local Economy such as Employment and Livelihood, etc Land Use and Utilization of Local Resources

B: A new reservoir is under construction by District Abbottabad

D: Since the proposed construction site is unused land and small, no negative impact is generated.

Social Institutions such as Social Infrastructure and Local Decision making Institutions Existing Social Infrastructure s and Services

B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

D: Though the proposed site is used for the collection of fodder for goats and sheep, the area is small compared to its surrounding land. Enough area remains after completion of the reservoir. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

D: Since the proposed construction site is unused land and small, no negative impact is generated.

B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

D: Though the proposed site is used for the collection of fodder for goats and sheep, the area is small compared to its surrounding land. Enough area remains after completion of the reservoir. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

D: Though the proposed site is used for the collection of fodder for goats and sheep, the area is small compared to its surrounding land. Enough area remains after completion of the reservoir. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

D: Since the proposed construction site is unused land and small, no negative impact is generated.

D: Since the proposed construction site is unused land and small, no negative impact is generated.

B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

D: Though the proposed site is used for the collection of fodder for goats and sheep, the area is small compared to its surrounding land. Enough area remains after completion of the reservoir. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since the existing road is used for transportation of materials and equipments, temporary inconvenience of residents will occur in the area.

Item 6 The Poor, Indigenous and Ethnic people Misdistributio n of Benefit and Damage

Banda Ghazan Rating; Reason D: No negative impact is generated. B: There are owners of the proposed construction site and access road

Lama Maira Rating; Reason D: No negative impact is generated. B: There are owners of the proposed construction site and access road

Salhad Rating; Reason D: No negative impact is generated. B: There are owners of the proposed construction site and access road.

Sheihkul Bandi Rating; Reason D: No negative impact is generated. B: There are owners of the proposed construction site and access road.

Mirpur Rating; Reason D: No negative impact is generated. B: There are owners of the proposed construction site and access road.

Nowanshehr Rating; Reason D: No negative impact is generated. B: There are owners of the proposed construction site and access road.

Banada Phugwarian Rating; Reason D: No negative impact is generated. B: The proposed construction area and access roads have their owners.

Dobathar Rating; Reason D: No negative impact is generated. B: There are owners of the proposed construction site and access road.

Derawandanh Rating; Reason D: No negative impact is generated. B: There are owners of the proposed construction site and access road. There is a small Graveyard few feet away from the proposed site. D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project. D: No negative impacts are generated. D: No negative impacts are generated. D: No negative impacts are generated.

Cultural heritage Local Conflicts of Interest

D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project.

D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated.

D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated.

D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated.

D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project. D: No negative impacts are generated. D: No negative impacts are generated. D: No negative impacts are generated.

D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project. D: No negative impacts are generated. D: No negative impacts are generated. D: No negative impacts are generated.

D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated.

D There are no cultural heritages at the site. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is possible that local conflicts may rise during the project. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated.

10

11

Water Usage or Water Rights and Communal Rights Sanitation

D: No negative impacts are generated. D: No negative impacts are generated. D: No negative impacts are generated.

12

Hazards (risk) Infectious Diseases such as HIV/AIDS

Item 13 Topography and Geographical Features Soil Erosion

Banda Ghazan Rating; Reason D: No negative impacts are generated. B: 1) Construction road to the site might generate the weathering or erosion. 2) The soil erosion happens if the excavated soil and rocks are left on the slope of the hill. D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

Lama Maira Rating; Reason D: No negative impact is generated. B: 1) Construction road to the site might generate the weathering or erosion. 2) The soil erosion happens if the excavated soil and rocks are left on the slope of the hill. D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

Salhad Rating; Reason D: No negative impact is generated. B: 1) Construction road to the site might generate the weathering or erosion. 2) The soil erosion happens if the excavated soil and rocks are left on the slope of the hill. D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

Sheihkul Bandi Rating; Reason D: No negative impact is generated. B: The soil erosion happens if the excavated soil and rocks are left on the slope of the hill.

Mirpur Rating; Reason D: No negative impacts are generated. B: 1) Construction road to the site might generate the weathering or erosion.

Nowanshehr Rating; Reason D: No negative impacts are generated. B: 1) Construction road to the site might generate the weathering or erosion.

Banada Phugwarian Rating; Reason D: No negative impact is generated. B: The soil erosion happens if the excavated soil and rocks are left on the slope of the hill.

Dobathar Rating; Reason D: No negative impact is generated. D: No negative impact is generated.

Derawandanh Rating; Reason D: No negative impacts are generated. B: 1) Construction road to the site might generate the weathering or erosion. 2) The soil erosion happens if the excavated soil and rocks are left on the slope of the hill. D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

14

Natural Environment

15 16 17 18

Groundwater Hydrological Situation Coastal zone Flora, Fauna and Biodiversity

19 20 21 22 Pollution 23

Meteorology Landscape Global Warming Air Pollution Water Pollution

D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

D: No negative impact is generated. D: Off the subject. D: Off the subject. D: Big lots of wildlife, rare species, endangered species and endemic species are not reported. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: An increase of the household effluent after the water system is completed is anticipated.

Item 24 25 Soil Contamination Waste

Banda Ghazan Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: There is a possibility that the traffic accident occurs when the machines and materials are transported to the construction site. B

Lama Maira Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: There is a possibility that the traffic accident occurs when the machines and materials are transported to the construction site. B

Salhad Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: Accidents caused by machines or falling stones are anticipated.

26

Noise and Vibration

27 28 29 30

Ground Subsidence Offensive Odor Bottom Sediment Accidents

Sheihkul Bandi Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. Accidents caused by labors carelessness are anticipated.

Mirpur Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: Accidents caused by machines or falling stones are anticipated.

Nowanshehr Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: Accidents caused by machines or falling stones are anticipated.

Banada Phugwarian Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: Accidents caused by machines or falling stones are anticipated.

Dobathar Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: Accidents caused by machines or falling stones are anticipated.

Derawandanh Rating; Reason D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after the completion. B: Noise and vibration caused by the use of heavy machines will arise in the construction of the access road. D: No negative impact is generated. D: No negative impact is generated. D: No negative impact is generated. B: Accidents caused by machines or falling stones are anticipated.

Overall rating Rating; A: Serious impact is expected, B: Some impact is expected, C: Extent of impact is unknown,

D: No impact is expected. IEE/EIA is not necessary.

7.2 Inlets, Raw water transmission mains, Treatment Plant, New Well and Replacement of existing wells
Inlet Items 1 Involuntary Resettlement Rating; Reason D Proposed construction site is on a riverbed and it is the governmental land. Resettlements will not be occurred, since there are no residents. D: No negative impact is generated. Raw water transmission mains Rating; Reason D Since pipes will be installed along ravines and main road, i.e. Murree road, Resettlements will be not generated. B: Since pipes pass by outside the front door of some stores at part of the route, a certain influence occurs. Treatment Plant Rating; Reason D Proposed site is open area. No inhabitants live at the site. Treated water transmission mains Rating; Reason D Since pipes will be installed along main road, i.e. Murree road, Resettlements will be not generated. B: Since pipes pass by outside the front door of some stores at part of the route, a certain influence occurs. New Well Rating; Reason D The proposed construction site is the empty land. There is no resident in the site. D: No negative generated. impact is D: No negative generated. impact is Replacement of existing wells Rating; Reason D There are no influences due to Replacement of existing wells.

Social Environment: *Impacts on Gender and Childrens Right may be related to all social environment criteria.

Local Economy such as Employment and Livelihood, etc Land Use and Utilization of Local Resources Social Institutions such as Social Infrastructure and Local Decision making Institutions Existing Social Infrastructure s and Services

D: Though the proposed site is used for the collection of fodder for goats and sheep, there are other large areas for collecting grasses.

D: The proposed construction site is unused land. No negative impact is generated. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. D: No negative generated.

D: The proposed construction site is unused land. No negative impact is generated. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since pipes will be installed along a road, before one month of starting the works, NOC "Non Objection Certification from a road administrator should be obtained. D: No negative impact is generated.

D: Though the proposed site is used for the collection of fodder for goats and sheep, there are other large areas for collecting grasses. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. D: No negative generated.

D: The proposed installation site of pipes is along main road, i.e. Murree road. No negative impact is generated. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. B: Since pipes will be installed along a road, before one month of starting the works, NOC "Non Objection Certification from a road administrator should be obtained. D: No negative impact is generated.

D: The proposed construction site is unused land. No negative impact is generated. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. D: No negative generated.

D: The proposed construction site is unused land. No negative impact is generated. B: Management cost and human resource will be likely in shortage, since the whole scale of the system will become large. D: No negative generated.

impact

is

impact

is

impact

is

impact

is

The Poor, Indigenous and Ethnic people

D: No negative generated.

impact

is

D: No negative generated.

impact

is

D: No negative generated.

impact

is

D: No negative generated.

impact

is

Inlet Items 7 Misdistributio n of Benefit and Damage Rating; Reason D: The issue of water rights with Haripur District has been solved. The allocation of water rights between Abbottabad and Haripur has been recognized on 53:47 by the High Court under presence of persons concerned including representative of inhabitant in Haripur district. Governor of Haripur has also accepted implementation of the project with reservations. Conditions are implementation of two irrigation projects. Besides, a meeting in which the representative of the farmer institution of a Haripur District also participated was held, and recognition of this project was made in the meeting. D There are no cultural heritages at the site. D: There are no reports of conflicts in the target area. D: The issue of water rights between downstream region residents is solved. The allocation of water rights between Abbottabad and Haripur has been decided in 53:47 by the High Court. Governor of Haripur also accepts implementation of the project with reservations.

Raw water transmission mains Rating; Reason D: No negative impact is generated.

Treatment Plant Rating; Reason D: No negative generated. impact is

Treated water transmission mains Rating; Reason D: No negative impact is generated.

New Well Rating; Reason D: No negative generated. impact is

Replacement of existing wells Rating; Reason D: No negative impact is generated.

Social Environment: *Impacts on Gender and Childrens Right may be related to all social environment criteria.

8 9

Cultural heritage Local Conflicts Interest of

D There are no cultural heritages at the site. D: There are no reports of conflicts in the target area. D: No negative generated. impact is

D There are no cultural heritages at the site. D: There are no reports of conflicts in the target area. D: No negative generated. impact is

D There are no cultural heritages at the site. D: There are no reports of conflicts in the target area. D: No negative generated. impact is

D There are no cultural heritages at the site. D: There are no reports of conflicts in the target area. D: No negative generated. impact is

D There are no cultural heritages at the site. D: There are no reports of conflicts in the target area. D: No negative generated. impact is

10

Water Usage or Water Rights and Communal Rights

Inlet Items 11 12 Sanitation Hazards (risk) Infectious Diseases such as HIV/AIDS Topography and Geographical Features Soil Erosion Rating; Reason D: No negative generated. D: No negative generated. D: No negative generated. impact impact is is

Raw water transmission mains Rating; Reason D: No negative impact is generated. D: No negative impact is generated. D: No negative generated.

Treatment Plant Rating; Reason D: No negative generated. D: No negative generated. D: No negative generated. impact impact is is

Treated water transmission mains Rating; Reason D: No negative impact is generated. D: No negative impact is generated. D: No negative generated.

New Well Rating; Reason D: No negative generated. D: No negative generated. D: No negative generated. impact impact is is

Replacement of existing wells Rating; Reason D: No negative impact is generated. D: No negative impact is generated. D: No negative generated.

13

impact

is

impact

is

impact

is

impact

is

impact

is

impact

is

14

B: 1) Construction road to the site might generate the weathering or erosion. D: Negative impact is not generated. D: Since at downstream and upstream of proposed construction site are armored with big stones, riverbed change will not be occurred likely. D: Off the subject D: The planned construction site of facilities is a riverbed, and although there is also construction in a riverbank in part, it is small-scale. Moreover, fishes which serve as rare species are not reported. D: No Negative impact is generated.

D: No negative generated. D: No negative generated. D: No negative generated.

impact

is

B: 1) Construction road to the site might generate the weathering or erosion. D: Negative impact is not generated. D: Off the subject

D: No negative generated. D: No negative generated. D: Out of object

impact

is

D: Negative impact is not generated. B: If pump displacement is large, it will affect groundwater level. D: Off the subject

D: No negative generated.

impact

is

15

Groundwater

impact

is

impact

is

Natural Environment

16

Hydrological Situation

impact

is

B: If pump displacement is large, it will affect groundwater level. D: Out of object

17 18

Coastal zone Flora, Fauna and Biodiversity

D: Off the subject D: Since pipes will be installed at side of Murree Road or craggy precipice of valley, No negative impact is generated to Flora, Fauna and Biodiversity. D: No negative generated.

D: Off the subject D: Big lots of wildlife, rare species, endangered species and endemic species are not reported.

D: Off the subject D: Since pipes will be installed at side of Murree Road or craggy precipice of valley, No negative impact is generated to Flora, Fauna and Biodiversity. D: No negative generated.

D: Off the subject D: No negative impacts are generated.

D: Off the subject D: No negative impacts are generated.

19

Meteorology

impact

is

D: No negative generated.

impact

is

impact

is

D: No negative impacts are generated.

D: No negative impacts are generated.

10

Inlet Items 20 Landscape Rating; Reason D: Though the proposed area has a landscape as a mountain stream, since the scale of inlets is small, there is little influence. D: No Negative impact is generated. D: No Negative impact is generated.

Raw water transmission mains Rating; Reason D: No negative impact is generated.

Treatment Plant Rating; Reason D: No negative generated. impact is

Treated water transmission mains Rating; Reason D: No negative impact is generated.

New Well Rating; Reason D: No negative impacts are generated.

Replacement of existing wells Rating; Reason D: No negative impacts are generated.

21 22

Global Warming Air Pollution

D: No negative generated. D: No negative generated.

impact impact

is is

23

Water Pollution

B: 1) Contamination of the water under the influence of construction is anticipated. 2) An increase of the household effluent after the water system is completed is anticipated. D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after completion. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is a possibility that local conflicts may raise during the project. All local conflicts should be addressed property.

B: An increase of the household effluent after the water system is completed is anticipated.

D: No negative impact is generated. B: Autoexhaust will be exhausted from heavy machines in constructing site of the plant and access road. B: An increase of the household effluent after the water system is completed is anticipated.

D: No negative generated. D: No negative generated.

impact impact

is is

D: No negative impacts are generated. D: No negative impacts are generated.

D: No negative impacts are generated. D: No negative impacts are generated.

B: An increase of the household effluent after the water system is completed is anticipated.

B: An increase of the household effluent after the water system is completed is anticipated.

B: An increase of the household effluent after the water system is completed is anticipated.

Pollution

24 25

Soil Contaminatio n Waste

26

Noise and Vibration

D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after completion. B: Noise and vibration caused by blasting and the use of heavy machines will arise in the construction work of the access road.

D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after completion. B: 1) Communities located close to the access road will be exposed to dust emission and noise pollution. 2) It is a possibility that local conflicts may rise during the project. All local conflicts should be addressed property.

D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after completion. B: Noise and vibration caused by blasting and the use of heavy machines will arise in the construction work of the access road.

D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after completion. D: Noise and vibration by boring machines may be generated, However they are too small to affect nearby residents. Noise not vibration by new installed pumps and motors will not affect the residences by jugging existing well systems.

D: No negative impact is generated. B: There is a possibility that the construction scraps and materials are left over the site, because the Pakistani does not have the custom of cleaning after completion. D: Noise and vibration caused by replacement work and operation will not arise.

11

Inlet Items 27 Ground Subsidence Offensive Odor Bottom Sediment Rating; Reason D: No Negative impact is generated. D: No Negative impact is generated. B: After construction completion, when treatment of excavated soils is not carried out appropriately, it is left on the riverbed with the excavated soils accumulated. B: Accidents caused by machines or falling stones are anticipated.

Raw water transmission mains Rating; Reason D: No negative impact is generated. D: No negative impact is generated. B: After construction completion, when treatment of excavated soils is not carried out appropriately, it is left on the riverbed with the excavated soils accumulated. B: Accidents caused by machines or falling stones are anticipated. B

Treatment Plant Rating; Reason D: No negative generated. D: No negative generated. D: No negative generated. impact is

Treated water transmission mains Rating; Reason D: No negative impact is generated. D: No negative generated. B: No negative generated. impact impact is is

New Well Rating; Reason B: There is possibility of ground subsidence by excess pumping. D: No negative impacts are generated. D: No negative impact is generated.

Pollution

28 29

impact impact

is is

Replacement of existing wells Rating; Reason B: There is possibility of ground subsidence by excess pumping. D: No negative impacts are generated. D: No negative impacts are generated.

30

Accidents

B: Accidents caused by machines or falling stones are anticipated. B

B: Accidents caused by machines or traffic accident of workers are anticipated B

Overall rating B Rating; A: Serious impact is expected, B: Some impact is expected, C: Extent of impact is unknown, D: No impact is expected. IEE/EIA is not necessary.

B: There is a possibility that the traffic accident occurs when the machines and materials are transported to the construction site. B

B: There is a possibility that the traffic accident occurs when the machines and materials are transported to the construction site. B

12

8. Mitigation and Monitoring for Key Impact 8.1 Service Reservoirs


3 Social Environment: *Impacts on Gender and Childrens Right may be related to all social environment criteria Environmental Items Land Use and Utilization of Local Resources Social Institutions such as Social Infrastructure and Local Decision making Institutions Banda Ghazan New site for construction of the reservoir should be researched. For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. 5 Existing Social Infrastructures and Services Transportation schedules will be informed to the residents For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Transportation schedules will be informed to the residents For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Transportation schedules will be informed to the residents For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Transportation schedules will be informed to the residents For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Transportation schedules will be informed to the residents For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Transportation schedules will be informed to the residents For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Transportation schedules will be informed to the residents For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Transportation schedules will be informed to the residents For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Transportation schedules will be informed to the residents Lama Maira Salhad Sheihkul Bandi Mirpur Nowanshehr Banada Phugwarian Dobathar Derawandanh

13

Environmental Items Misdistribution of Benefit and Damage

Banda Ghazan Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them.

Lama Maira Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them.

Salhad Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them.

Sheihkul Bandi Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them.

Mirpur Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them.

Nowanshehr Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them.

Banada Phugwarian Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them.

Dobathar Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them.

Derawandanh Appropriate compensation should be paid to landowners for construction of access roads or the reservoir. A notification has been given to the land owners according to law and consent have already been obtained from them. If influence arises to a graveyard, it is necessary to change the form of facilities. 1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly. The access road will be covered with gravel pavement. Excavated soil and rocks should be treated adequately to prevent the collapse of the slope.

Local Conflicts Interest

of

1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly. The access road will be covered with gravel pavement. Excavated soil and rocks should be treated adequately to prevent the collapse of the slope.

1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly. The access road will be covered with gravel pavement. Excavated soil and rocks should be treated adequately to prevent the collapse of the slope.

1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly. The access road will be covered with gravel pavement. Excavated soil and rocks should be treated adequately to prevent the collapse of the slope.

1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly. The access road will be covered with gravel pavement. Excavated soil and rocks should be treated adequately to prevent the collapse of the slope.

1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly. The access road will be covered with gravel pavement.

1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly. The access road will be covered with gravel pavement.

1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly. Excavated soil and rocks should be treated adequately to prevent the collapse of the slope.

1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly.

14 Natural Environment

Soil Erosion

14

23

Environmental Items Water Pollution

Banda Ghazan Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration. The traffic accident can be prevented by informing the transportation schedule to the residents and putting person to guide the transportation cars.

Lama Maira Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration. The traffic accident can be prevented by informing the transportation schedule to the residents and putting person to guide the transportation cars.

Salhad Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration. The traffic accident can be prevented by informing the transportation schedule to the residents and putting person to guide the transportation cars.

Sheihkul Bandi Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site.

Mirpur Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration. The accidents can be prevented by implementing safety education and training to the labors.

Nowanshehr Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration. The accidents can be prevented by implementing safety education and training to the labors.

Banada Phugwarian Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration. The accidents can be prevented by implementing safety education and training to the labors.

Dobathar Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration. The accidents can be prevented by implementing safety education and training to the labors.

Derawandanh Preparation of the sewer facility according to an increase in population is expected. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration. The traffic accident can be prevented by informing the transportation schedule to the residents and putting person to guide the transportation cars.

25

Waste

Pollution 26

Noise and Vibration

30

Accidents

The traffic accident can be prevented by informing the transportation schedule to the residents and putting person to guide the transportation cars.

Rating; A: Serious impact is expected, B: Some impact is expected, C: Extent of impact is unknown, D: No impact is expected. IEE/EIA is not necessary.

15

8.2 Inlets, Raw water transmission mains, Treatment Plant, New Well and Replacement of existing wells
Item 2 Social Environment: *Impacts on Gender and Childrens Right may be related to all social environment criteria. Local Economy such as Employment and Livelihood, etc Social Institutions such as Social Infrastructure and Local Decision making Institutions For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. 5 Existing Social Infrastructures and Services Inlet Raw water transmission mains Appropriate compensation should be paired to object persons. Treatment Plant Appropriate compensation should be paired to object persons. They have been already informed and understand constriction of the treatment plant. For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. Treated water transmission mains Appropriate compensation should be paired to object persons. New Well Replacement of existing wells

For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. It is necessary to submit a request to obtain permission of construction to a road administrator one month before a construction start. Besides, it is necessary to also inform the telecommunications company and gas company which compete at the time of pipe installation about a construction start.

For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly. It is necessary to submit a request to obtain permission of construction to a road administrator one month before a construction start. Besides, it is necessary to also inform the telecommunications company and gas company which compete at the time of pipe installation about a construction start.

For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly.

For the improvement on the management side after the implementation of the project, it is necessary to consider the price raising of the water rate which is set considerably low now. The implementation agency is planning establishment of the organization for carrying out operation and maintenance newly.

14 Natural Environment 15

Soil Erosion Groundwater

1) Construction road will be covered with gravel pavement.

1) Construction road will be covered with gravel pavement. Establishing a proper pump discharge, suitable monitoring and operation should be carried out. Establishing a proper pump discharge, suitable monitoring and operation should be carried out.

16

Item 22 Air Pollution

Inlet

Raw water transmission mains

Treatment Plant It is possible to reduce the autoexhaust gas with use of exhaust gas reduction type heavy machines and conducting daily check of the machines. 1) Preparation of the sewer facility according to an increase in population is expected.

Treated water transmission mains

New Well

Replacement of existing wells

23

Water Pollution

1) Preparation of the sewer facility according to an increase in population is expected. 2) A settling basin will be built in a downstream area and the influence can be reduced. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. 1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly.

1) Preparation of the sewer facility according to an increase in population is expected. 2) A settling basin will be built in a downstream area and the influence can be reduced. Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration.

1) Preparation of the sewer facility according to an increase in population is expected.

1) Preparation of the sewer facility according to an increase in population is expected.

1) Preparation of the sewer facility according to an increase in population is expected.

25

Waste

26

Noise and Vibration

Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration.

Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. 1) The access road should be watered regularly to suppress dust. Proper maintenance of the equipment and vehicles to minimize noise emission should be conducted. 2) All local conflicts should be addressed properly.

Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration.

Cleaning works should be stipulated in the specification documents and construction supervising should be conducted properly to prevent the construction scraps and materials to be left over the site. The heavy machines should be regularly checked and maintained to minimize the noise and vibration.

Pollution 27

Ground Subsidence Accidents The accidents can be prevented by implementing safety education and training to the labors. The accidents can be prevented by implementing safety education and training to the labors. The accidents can be prevented by implementing safety education and training to the labors. The accidents can be prevented by implementing safety education and training to the labors.

30

Establishing a proper pump discharge, suitable monitoring and operation should be carried out. The traffic accident can be prevented by informing the transportation schedule to the residents and putting person to guide the transportation cars.

Establishing a proper pump discharge, suitable monitoring and operation should be carried out. The traffic accident can be prevented by informing the transportation schedule to the residents and putting person to guide the transportation cars.

17

9. Whether another environmental and social considerations study is required at this stage or not? NOC, Non-Objection Certificate issued by Environmental Protection Agency(EPA), NWFP on May 2004 has been already expired according to Pakistan Environmental Protection Agency (Review of IEE and EIA) Regulations, 2000 and the estimated project cost is more than Rs.25millon. According the Regulation, 2000, it is necessary to conduct EIA. The previous IEE/EIA procedure was legally the same as the present procedure. However, only IEE was carried out and NOC was issued by EPA based on the result of the IEE. Therefore, District Government Abbottabad which is the implementation Agency is now asking whether the project needs EIA or otherwise. 10. Consultation (state who has been contacted about the project, means of contacting them, date when they were contacted and so on.) (1) The tribunal of inquiry at Peshawar High Court The court which carried out hearing and mediation in which any people and organizations which got interested in this project of both district of Abbottabad and Haripur on July 4 and 5, 2005 could participate was held. It was judged that the water allocation ratio between District of Abbottabad and Haripur which had been given 57:43 (1904 to 1905 determination) in allocation of irrigation water was effective. However, there was a view that this allocation was not suitable with the present condition. Therefore it was proposed that a certain taking measures would be required to carry out about the irrigation water in District Haripur. (2) A meeting on the water rights of downstream area, Haripur A meeting was held under attendance of District Nazim Abbottabad, DCO (District Coordinate Officer) Abbottabad, Haripur and Representatives of farmers of District Haripur at June 22, 2004 or August 12, 2004. It was clarified in this meeting that the proposal of this project did not contain construction of any sort of dam on Daur (Dor) River and issues of water rights would not arise. (3) Approval of Governor District Nazim Haripur Approval of implementation of this project was obtained with the following condition from District Nazim Haripur on July 25, 2006. 1) Rehabilitation of Daur (Dor) Main Canal District Haripur 2) Construction of 15 tube wells for irrigation Regarding 1), a study and detail design Rehabilitation of Daur Main Canal in District Haripur (Sub-work Geological investigation including Sub Soil Low and Detail Design of the Pick up Weir was already conducted in 2007. Regarding 2), five (5) tube wells of 15 were constructed in 2007 and the power distribution will be carried out till the end of 2008. Discharge of one tube well is 1.5cusec (42.6 lit/s).

18