You are on page 1of 344

The United States Conference of Mayors

Release #4: January 17, 2009

MAINSTREET
Community Development, Green Jobs, Transit, Streets/Highways, Airports, Amtrak, Water, Schools, Housing, Public Safety

“Ready to Go”
Jobs and Infrastructure Projects

Manuel A. (Manny) Diaz


Mayor of Miami
President

Tom Cochran
CEO and Executive Director

The United States Conference of Mayors


THE UNITED STATES
CONFERENCE OF MAYORS

Manuel A. (Manny) Diaz


Mayor of Miami
President

Greg Nickels
Mayor of Seattle
Vice President

Elizabeth B. Kautz
Mayor of Burnsville
Second Vice President

Tom Cochran
CEO and Executive Director

do your part! please recycle!

design: Redshed Creative, www.redshedcreative.com


“READY TO GO” JOBS AND INFRASTRUCTURE PROJECTS

America’s Mayors Report to the Nation on Projects to


Strengthen Metro Economies and Create Jobs Now

Release #4: January 17, 2009

Infrastructure Jobs in Cities – “Ready to Go”

Today The U.S. Conference of Mayors releases the fourth in its series of reports on
infrastructure projects that are “ready to go” in cities across the nation – projects that meet local
infrastructure needs and contribute to local economic development goals, that can be funded
quickly through existing federal channels and start quickly when funding is received, and that
can generate the significant numbers of jobs that are needed to counter the severe economic
problems we face today in our metro areas and our nation as a whole.

Today we are reporting that, in 779 cities of all sizes in all regions of the country, a
total of 18,750 local infrastructure projects are “ready to go.” These projects represent
an infrastructure investment of $149,758,339,126 that would be capable of producing an
estimated 1,604,371 jobs in 2009 and 2010. These are the cumulative totals of projects,
required funding, and jobs to be created that have been reported in the four surveys of cities
conducted by the Conference of Mayors over the past three months. The populations of the
779 cities submitting projects total 77,946,664.

The Conference of Mayors MainStreet Economic Recovery plan, developed under the
leadership of Miami Mayor Manuel A. (Manny) Diaz, the President of the Conference, calls for
federal investments in 10 sectors that will quickly create jobs in metro areas, improve the
infrastructure that the private sector needs to succeed, help the small businesses of Main Street
America, and produce lasting economic and environmental benefits for the nation. The
following chart summarizes, for each of the 10 sectors, the number of infrastructure projects
described by the 779 cities, the total investment that would be required to implement these
projects, and the estimated number of jobs that they would generate.

SECTOR PROJECTS FUNDING JOBS


Community Development Block Grants 4,028 26,507,901,425 385,256
Energy Block Grants and Green Jobs 1,378 30,604,966,149 151,811
Transit Equipment and Infrastructure 807 11,304,982,392 137,770
City Streets/Metro Roads 4,724 35,954,375,822 433,574
Airport Technology and Infrastructure 529 5,462,483,130 47,061
Amtrak 50 1,194,260,000 4,583
Water and Wastewater Infrastructure 4,029 23,494,889,132 271,429
School Modernization 1,066 7,082,502,544 108,336
Public Housing Modernization 634 2,474,602,762 25,160
Public Safety Jobs and Technology 1,505 5,677,375,769 39,391
Cities were invited to submit projects that reflected their unique local infrastructure
needs, produced jobs for their residents, and contributed to future economic development.
Readers of this report should note that some cities were unable to submit estimates of jobs to
be created by all of their individual projects. Because this information could not be included in
our tabulations, the total job numbers we are reporting for the cities as a group should be
considered conservative.

Mayors recognize that the economic recovery initiative to be undertaken by the new
administration and Congress will include a review process through which projects eligible for
funding will be identified. The projects listed in this report in no way represent an inventory of
projects formally proposed for funding. Rather, they are examples of the kinds of projects that,
if funded through existing channels, would contribute to local infrastructure needs and economic
development and to the President-elect’s stated goals for infrastructure revitalization and job
creation.

All projects received from mayors and cities are included by the Conference in its
reports. The mayors and cities responding to the Conference surveys have used their own
processes to determine which projects will be submitted, and the responsibility for justifying the
individual projects that are put forward resides with them.

Documenting the Need for Infrastructure Investment

In early November, cities across the nation provided the Conference of Mayors with
examples of needed infrastructure projects that could be started quickly and completed in 2009
if additional federal funding were made available for them in any of the 10 MainStreet
infrastructure investment sectors. For these projects, the cities gave us their estimates of the
amount of funding that would be needed and the number of jobs that would be created. A
report describing more than 4,600 projects in 154 cities capable of creating well over a quarter-
million jobs was released by the Conference in Washington on November 13.

A week after the release of this first report, President-elect Obama stated a goal of
creating 2.5 million jobs in America by 2011 – a goal strongly supported by the nation’s mayors.
The President-elect described a two-year initiative to rebuild the nation’s crumbling
infrastructure. In response, the Conference invited cities to again submit information on
infrastructure projects, this time on projects that could start quickly in 2009 and be completed by
the end of 2010. The report on this second survey was released in Washington, in a Capitol Hill
press conference, on December 8. It listed nearly 11,400 projects in 427 cities that were
capable of creating nearly 848,000 jobs – an estimate the Conference considers to be
conservative.

Immediately following the press conference, a delegation of mayors led by Conference


President Diaz met with House Speaker Nancy Pelosi and several Committee Chairs, presented
them with copies of the report, and briefed them on the advantages of direct funding of
infrastructure projects in cities through existing programs such as the Community Development
Block Grant. The mayors’ report and proposal for economic recovery were also discussed in a
meeting which followed with Senate Majority Leader Harry Reid, New York Senator Charles
Schumer, and Michigan Senator Debbie Stabenow, and with members of the Obama-Biden
intergovernmental transition team.

2
The following week, in Chicago, the survey report was included in a mayors’ meeting
with President-elect Obama, his designated Assistant for Intergovernmental Relations and
Public Liaison, Valerie Jarrett, and his designated Director of Intergovernmental Affairs, Cecilia
Munoz.

Because the Conference continued to receive requests from cities to contribute to the
published examples of “ready-to-go” projects, a third invitation to submit project information was
sent to mayors on December 10. Many new cities responded, and many of the cities included in
the Conference’s first and second reports submitted additional projects. The Conference’s third
report, released December 19, listed well over 15,000 projects in 641 cities capable of
producing more than 1.2 million jobs.

Responding again to cities’ requests to add projects to the Conference’s growing “ready
to go” list, a fourth invitation to submit information was sent to mayors on December 29. As this
report shows, the projects added by new cities, along with those added by cities included in the
earlier reports, again significantly increased our total estimates of federal infrastructure funding
that could be invested and jobs that could be created.

A Call to Action – More Urgent Each Day

Over the past year, the scope of the economic crisis affecting Main Street America has
been well documented and widely reported. As we enter 2009, economic activity continues to
slow and the labor market continues to deteriorate. Consumer spending, business investment,
and industrial production continues to decline. Problems affecting financial markets and credit
conditions remain unresolved. We know that, as the economy weakens and joblessness
increases, the current real estate foreclosure crisis can only worsen.

The nation’s unemployment rate reached 7.2 percent in December, 2.3 percentage
points higher than a year ago. Since the start of the recession in December 2007, the nation
has lost 3.6 million jobs. About 11.1 million American workers are now unemployed, another
1.9 million are “marginally attached” to the labor force (meaning that they have looked
unsuccessfully for work at some point in the past year), and recent calculations suggest that one
in every eight workers is now underemployed. The ranks of the long-term unemployed (those
jobless for 27 weeks or more) doubled in 2008, to 2.6 million; claims for unemployment benefits
are at the highest level in a quarter-century; and, in many states across the nation, the extended
benefits that have been paid to the long-term unemployed will soon be cut off.

In today’s world, metro economies drive the national economy, currently accounting for
86 percent of national employment, 90 percent of labor income, and 90 percent of gross
domestic product (GDP). It should be obvious that investing in Main Street metro
economies is the most direct path to creating the jobs and stimulating the business that
can begin to resolve the current economic crisis.

Washington has used hundreds of billions of federal dollars to bail out Wall Street,
banks, insurance companies and others, and hopes that this investment will eventually be
returned to the U.S. Treasury and the taxpayer. It is now time for Washington to make another
kind of investment, one that guarantees a return: It is time to initiate MainStreet Economic
Recovery – immediate and direct assistance that enables local governments and the
private sector to invest in the infrastructure and create the jobs that will help restore this
nation’s economic growth.

3
Opponents of economic stimulus spending assert that, because infrastructure projects
could take years to start and many more years to complete, investing in them would not have
the short-term impact on the economy that is needed. We have documented in this report,
however, that there are many thousands of infrastructure projects in cities that can get
underway immediately and be completed quickly – within one or two years. As we
report, projects in just 779 cities are capable of quickly generating over 1.6 million jobs –
more than half of the total three million jobs now sought by the President-elect over the
next two years.

MainStreet Economic Recovery – Immediate and Direct

On October 29, Louisville Mayor Jerry Abramson, a Past President of the Conference,
presented the Conference’s initial MainStreet plan to the House Transportation and
Infrastructure Committee. On the same day, our Immediate Past President, Trenton Mayor
Doug Palmer, presented it to the House Ways and Means Committee. The plan they presented
was based on the package of programs for a second economic stimulus that passed the House
of Representatives in September but was stopped in the Senate. To that House package we
added three needed initiatives: Community Development Block Grant for Infrastructure; Green
Jobs – Energy/Environment Block Grant; and Public Safety.

In most of the programs, 30 percent or more of the funding would go to the states, with
the remainder going to cities and counties – the metro areas that account for the bulk of the
nation’s gross domestic product. In the transportation sector, our plan demands that current-law
commitments to local areas be preserved in distributing funds under the Surface Transportation
Program (STP).

It is important to understand that our MainStreet Economic Recovery plan calls for
funds to flow quickly and directly to cities through 10 federal funding streams that are
already in existence; many of these have demonstrated their effectiveness over many
years. The 10 infrastructure investments we are recommending are:

• Community Development Block Grants – CDBG would be used to create jobs through:
the construction of public facilities and improvements, water and sewer facilities, streets,
and neighborhood centers; the conversion of school buildings for eligible purposes; activities
relating to energy conservation and renewable energy resources; and assistance to profit-
motivated businesses to carry out economic development and job creation/retention
activities.

• Energy Block Grants and Green Jobs – The new Energy Efficiency and Conservation
Block Grant (EECBG) program would be used by cities, counties, and states to create
thousands of energy efficiency and renewable energy production projects. These projects
could include energy retrofits of public and private buildings in local areas, installation of
solar panels or wind turbines for the production of electricity on local buildings, deployment
of new energy distribution technologies (such as distributed generation or district heating
and cooling systems) that significantly increase energy efficiency, and development of
systems to capture and generate power from methane at landfills.

4
• Transit Equipment and Infrastructure – Transit funding would be used to purchase buses,
street cars, rail cars, and other rolling stock and equipment needed to create additional
capacity; help stabilize fare increases; and improve reliability. It would also be used to
restore and maintain facilities and infrastructure in a state of good repair through projects
that could, for example, expand station capacity, improve rail tracks, and provide customer
information screens.

• City Streets/Metro Roads – Highway funding must be distributed through the Surface
Transportation Program (STP); this ensures that it will provide maximum flexibility to cities,
counties, and states to undertake bridge, bus and rail, and road projects in metropolitan
areas.

• Airport Technology and Infrastructure – Projects funded through the Airport Improvement
Program (AIP) would include runway and taxi rehabilitations, extensions, and widening;
obstruction removal; apron construction, expansion and rehabilitation; rescue and
firefighting equipment and facilities; airside service or public access roads; and noise
mitigation and abatement (Part 150) associated with aircraft operations, including voluntary
home buyout, which would fuel the local housing market, and residential and business
insulation programs.

• Amtrak – Amtrak would use infrastructure funding to make necessary upgrades to tracks,
bridges and tunnels, electric traction, interlockings, signals and communications, and
stations on the Amtrak system. In addition, Amtrak could refurbish rail cars that are
currently in storage and return them to service.

• Water and Wastewater Infrastructure – Local governments contribute 98 percent of the


total investment in wastewater and 95 percent of the investment in water infrastructure.
Water and wastewater infrastructure grants would be used to assist with rehabilitating aging
water and sewer infrastructure, complying with sewer overflow issues, and promoting source
water protection and availability.

• School Modernization – Federal school modernization funds would be used to repair and
modernize school buildings in both large- and small-city school districts, improve their
energy efficiency, and equip them with first-class technology.

• Public Housing Modernization – Public Housing Capital Funds would be used for repair
and construction projects, including safety repairs.

• Public Safety Jobs and Technology – Providing COPS hiring grants to local police
departments would allow them to put additional police officers on the streets and in the
schools as school resource officers. Additional Byrne Justice Assistance Grant funding
could be used to hire personnel, support those personnel, and purchase equipment and new
technologies which make law enforcement personnel more effective in their jobs.

“Ready to Go” Infrastructure Projects

For each of our 10 MainStreet infrastructure investment sectors, the following pages list
infrastructure projects that are ready to start quickly in 2009 and be completed by the end of
2010 if federal funding is provided. The projects are listed by state and, within state, by city.

5
Survey Cities with 2007 Census Population Estimates
Anchorage AK 279,671 Beverly Hills CA 34,597
Anniston AL 23,689 Cathedral City CA 52,288
Auburn AL 54,348 Cerritos CA 51,647
Bessemer AL 28,657 Chino Hills CA 74,363
Birmingham AL 229,800 Citrus Heights CA 84,469
Decatur AL 55,741 Compton CA 94,425
Florence AL 37,449 Covina CA 47,251
Gadsden AL 36,936 Cypress CA 47,145
Huntsville AL 171,327 Elk Grove CA 131,212
Mobile AL 191,411 Encinitas CA 59,978
Prichard AL 27,791 Folsom CA 67,401
Tuscaloosa AL 88,722 Fountain Valley CA 55,471
Fayetteville AR 72,208 Fresno CA 470,508
Fort Smith AR 84,375 Glendora CA 49,713
Little Rock AR 187,452 Hayward CA 140,943
North Little Rock AR 59,490 Hercules CA 24,504
Pine Bluff AR 50,667 Huntington Beach CA 192,885
Springdale AR 66,881 Indio CA 83,937
Avondale AZ 79,798 Inglewood CA 113,376
Bullhead City AZ 40,980 Irvine CA 201,160
Casa Grande AZ 38,134 La Mesa CA 53,990
El Mirage AZ 26,431 Lakewood CA 78,956
Flagstaff AZ 59,746 Livermore CA 79,532
Gilbert AZ 207,550 Lodi CA 61,695
Goodyear AZ 52,864 Long Beach CA 466,520
Kingman AZ 27,696 Los Angeles CA 3,834,340
Lake Havasu City AZ 56,603 Manhattan Beach CA 36,536
Mesa AZ 452,933 Merced CA 76,879
Peoria AZ 146,743 Modesto CA 203,955
Phoenix AZ 1,552,259 Napa CA 74,247
Sahuarita AZ 16,153 Newark CA 41,680
Scottsdale AZ 235,677 Oakland CA 401,489
South Tucson AZ 5,598 Ontario CA 170,936
St. Johns AZ 3,592 Palm Desert CA 50,729
Tombstone AZ 1,562 Pasadena CA 143,400
Tucson AZ 525,529 Pittsburg CA 62,511
Yuma AZ 88,687 Pleasanton CA 66,544
Alameda CA 70,272 Plymouth CA 1,044
Alhambra CA 86,352 Rancho Cordova CA 60,988
Anaheim CA 333,249 Redding CA 89,780
Apple Valley CA 70,322 Redlands CA 69,941
Bell CA 36,859 Redondo Beach CA 67,019
Bell Gardens CA 44,848 Rialto CA 98,713
Riverside CA 294,437 Stamford CT 118,475
Sacramento CA 460,242 Stratford CT 49,015
San Bernardino CA 199,285 Waterbury CT 107,174
San Bruno CA 40,017 West Hartford CT 60,486
San Diego CA 1,266,731 West Haven CT 52,676
San Francisco CA 764,976 Washington DC 588,292
San Gabriel CA 40,602 Wilmington DE 72,868
San Jose CA 939,899 Boynton Beach FL 67,908
San Leandro CA 77,725 Cape Coral FL 156,981
San Marcos CA 78,286 Clearwater FL 106,642
Santa Ana CA 339,555 Cocoa Beach FL 12,021
Santa Barbara CA 86,204 Coconut Creek FL 50,321
Santa Cruz CA 55,322 Coral Gables FL 42,107
Santa Monica CA 87,212 Coral Springs FL 126,875
Santa Rosa CA 154,241 Doral FL 22,925
Simi Valley CA 120,464 Dunedin FL 36,285
Stockton CA 287,245 Fort Lauderdale FL 183,606
Sunnyvale CA 131,140 Fort Myers FL 64,258
Sutter Creek CA 2,732 Gretna FL 1,602
Temecula CA 94,767 Hallandale Beach FL 38,634
Torrance CA 141,420 Hialeah FL 212,217
Tracy CA 79,705 Hollywood FL 142,473
Turlock CA 68,133 Homestead FL 56,601
Ventura CA 103,219 Jacksonville FL 805,605
Visalia CA 118,603 Key Biscayne FL 9,797
Vista CA 90,839 Lakeland FL 92,796
West Sacramento CA 46,492 Largo FL 73,298
Arvada CO 106,328 Lauderhill FL 67,565
Aurora CO 311,794 Lauderdale Lakes FL 31,295
Boulder CO 93,552 Miami FL 409,719
Colorado Springs CO 376,427 Miami Beach FL 85,036
Denver CO 588,349 Miami-Dade FL 2,387,170
Durango CO 16,007 Miramar FL 108,240
Englewood CO 32,532 North Miami FL 56,185
Greeley CO 90,306 North Miami Beach FL 38,201
Lakewood CO 140,305 Oakland Park FL 42,151
Merino CO 273 Orlando FL 227,907
Rico CO 246 Palm Bay FL 100,116
Thornton CO 110,880 Pembroke Pines FL 146,828
Bridgeport CT 136,695 Pinecrest FL 18,694
Danbury CT 79,226 Pinellas Park FL 47,468
Enfield CT 45,011 Plantation FL 84,370
Hartford CT 124,563 Port St. Lucie FL 151,391
Meriden CT 59,225 Riviera Beach FL 36,566
Middletown CT 47,778 South Daytona FL 13,840
Naugatuck CT 31,931 Tallahassee FL 168,979
New Haven CT 123,932 Tamarac FL 59,668
Norwalk CT 83,456 Tampa FL 336,823
Tavares FL 13,661 Meridian ID 64,642
Wellington FL 54,479 Montpelier ID 2,370
West Palm Beach FL 99,377 Murtaugh ID 144
Winter Springs FL 32,961 Newdale ID 354
Acworth GA 19,130 Orofino ID 3,073
Alpharetta GA 49,662 Paris ID 494
Athens GA 100,266 Pocatello ID 54,572
Atlanta GA 519,145 Rexburg ID 27,575
College Park GA 20,113 Rupert ID 5,075
Conyers GA 13,343 Salmon ID 2,961
Hinesville GA 30,504 Shelley ID 4,146
Macon GA 93,076 Soda Springs ID 3,098
Marietta GA 67,021 St. Charles ID 131
Savannah GA 130,331 Sugar City ID 1,521
Hawaii HI 173,057 Teton ID 569
Honolulu HI 375,571 Addison IL 36,975
Kauai HI 62,828 Alsip IL 18,803
Maui HI 141,783 Alton IL 29,414
Wailuku HI 13,543 Amboy IL 2,579
Davenport IA 98,975 Arlington Heights IL 73,693
Des Moines IA 196,998 Aurora IL 170,855
Arco ID 982 Bartlett IL 41,324
Arimo ID 315 Blue Island IL 22,395
Ashton ID 1,088 Bolingbrook IL 70,476
Bancroft ID 347 Bourbonnais IL 17,942
Bellevue ID 2,168 Bridgeview IL 14,973
Blackfoot ID 10,867 Buda IL 572
Bloomington ID 225 Bureau Junction IL 357
Boise ID 202,832 Burnham IL 4,002
Buhl ID 4,037 Calumet City IL 37,064
Burley ID 8,984 Canton IL 14,581
Council ID 691 Carbon Hill IL 409
Crouch ID 164 Carbon Hill IL 409
Dayton ID 440 Carpentersville IL 37,527
Firth ID 485 Cedar Point IL 261
Garden City ID 11,562 Channahon IL 13,821
George Town ID 469 Cherry IL 492
Glenns Ferry ID 1,408 Chicago Heights IL 30,814
Grace ID 941 Cicero IL 80,976
Hansen ID 959 Coal City IL 5,587
Idaho City ID 478 Crystal Lake IL 41,630
Idaho Falls ID 53,279 Crest Hill IL 20,463
Jerome ID 8,827 Dalzell IL 722
Kellogg ID 2,227 Depue IL 1,765
Ketchum ID 3,234 Diamond IL 2,348
Lava Hot Springs ID 486 East Brooklyn IL 123
Lewiston ID 31,794 Elgin IL 104,288
Malad ID 2,065 Evanston IL 75,905
Frankfort IL 17,474 Paw Paw IL 884
Gardner IL 1,465 Peotone IL 4,246
Glendale Heights IL 31,970 Peru IL 9,803
Glenview IL 46,329 Princeton IL 7,526
Glenwood IL 8,551 Quincy IL 40,069
Grand Ridge IL 522 Richton Park IL 12,886
Granite City IL 30,683 Riverdale IL 14,277
Granville IL 1,352 Romeoville IL 37,136
Harvey IL 28,239 Sandwich IL 7,326
Hennepin IL 705 Sauk Village IL 10,336
Hickory Hills IL 13,381 Schaumburg IL 72,147
Highland Park IL 31,457 Seatonville IL 309
Hoffman Estates IL 53,145 Seneca IL 2,108
Homer Glen IL 25,947 Sheffield IL 942
Homewood IL 18,607 Sheridan IL 2,220
Kangley IL 272 South Holland IL 21,235
Kinsman IL 109 South Wilmington IL 633
La Salle IL 9,532 Spring Valley IL 5,371
Lansing IL 26,853 Standard IL 252
Lombard IL 42,841 Streator IL 13,795
Lostant IL 473 Thornton IL 2,405
Lynwood IL 7,976 Tinley Park IL 59,102
Manhattan IL 6,706 Tiskilwa IL 756
Manlius IL 343 Toluca IL 1,269
Mark IL 507 Tonica IL 698
Marseilles IL 4,894 Troy Grove IL 302
Matteson IL 17,080 Varna IL 417
Mazon IL 1,003 Verona IL 256
McNabb IL 282 Watseka IL 5,493
Mineral IL 263 Wenona IL 1,052
Moline IL 43,016 West Brooklyn IL 168
Morris IL 13,562 Woodridge IL 34,151
Naplate IL 514 Worth IL 10,499
Neponset IL 497 Wyanet IL 995
Niles IL 28,848 Carmel IN 64,400
Normal IL 51,716 Crawfordsville IN 15,066
North Chicago IL 32,897 Crown Point IN 23,909
North Utica IL 1,013 East Chicago IN 30,151
Northbrook IL 34,037 Evansville IN 116,253
Oak Brook IL 8,797 Fort Wayne IN 251,247
Oak Park IL 49,865 Gary IN 96,429
Oglesby IL 3,650 Hammond IN 77,175
Olympia Fields IL 4,695 Hobart IN 27,830
Orland Park IL 55,663 Indianapolis IN 795,458
Ottawa IL 19,142 Kokomo IN 45,902
Palatine IL 67,317 Lake Station IN 13,295
Palos Park IL 4,880 Lawrence IN 42,736
Park Forest IL 22,687 Merrillville IN 32,147
Michigan City IN 31,851 Dexter MI 3,300
Mishawaka IN 49,439 Eastpointe MI 32,640
Muncie IN 65,410 Flint MI 114,662
Plymouth IN 10,985 Fraser MI 14,961
Richmond IN 36,993 Grand Rapids MI 193,627
St. John IN 12,302 Grosse Pointe MI 5,161
Terre Haute IN 58,932 Grosse Pointe Farms MI 8,879
Whiting IN 4,768 Grosse Pointe Woods MI 15,619
Kansas City KS 142,320 Jackson MI 34,022
Lenexa KS 45,681 Kalamazoo MI 72,637
Manhattan KS 51,707 Keego Harbor MI 2,842
Newton KS 18,017 Lansing MI 114,947
Bowling Green KY 54,244 Livonia MI 93,931
Frankfort KY 27,098 Marshall MI 7,182
Hopkinsville KY 31,638 Oak Park MI 30,715
Lexington KY 279,044 Port Huron MI 31,083
Louisville KY 557,789 Portage MI 46,066
Shelbyville KY 11,173 Roseville MI 46,977
Alexandria LA 45,857 Southfield MI 75,389
Amite LA 4,297 Southgate MI 28,517
Baton Rouge LA 227,071 St. Clair MI 5,813
Bossier City LA 61,801 Sterling Heights MI 127,349
Monroe LA 51,208 Taylor MI 62,374
New Iberia LA 32,910 Wayne MI 17,707
New Orleans LA 239,124 Westland MI 81,283
Shreveport LA 199,569 Arden Hills MN 9,890
Amesbury MA 12,457 Avon MN 1,311
Boston MA 599,351 Belgrade MN 714
Brockton MA 93,092 Burnsville MN 59,118
Chicopee MA 53,876 Chanhassen MN 23,720
Haverhill MA 59,902 Duluth MN 84,397
Lynn MA 87,122 Edina MN 45,912
Malden MA 55,712 Hanover MN 2,542
Northampton MA 28,411 Hugo MN 12,417
Quincy MA 91,622 Isle MN 904
Woburn MA 37,042 Mahtomedi MN 7,990
Annapolis MD 36,603 Melrose MN 3,150
Baltimore MD 637,455 Minneapolis MN 377,392
Lewiston ME 35,234 Moorhead MN 35,329
Portland ME 62,825 New Munich MN 341
Battle Creek MI 52,233 Princeton MN 4,776
Bingham Farms MI 992 Richfield MN 33,387
Center Line MI 8,171 Rosemount MN 21,004
Clair Shores MI 60,638 Roseville MN 32,474
Clawson MI 12,269 Shorewood MN 7,577
Dearborn MI 89,252 Silver Creek MN 2,270
Dearborn Heights MI 53,562 St. Augusta MN 3,272
Detroit MI 916,952 St. Cloud MN 66,503
St. Louis Park MN 44,028 Bozeman MT 37,981
St. Paul MN 277,251 Darby MT 853
Staples MN 3,041 Missoula MT 67,165
Clayton MO 16,076 Shelby MT 3,417
Columbia MO 99,174 Asheville NC 73,875
Ellisville MO 9,233 Charlotte NC 671,588
Florissant MO 50,919 Concord NC 64,653
Jefferson City MO 40,564 Durham NC 217,847
Kansas City MO 450,375 Fayetteville NC 171,853
Pine Lawn MO 4,019 Gastonia NC 71,059
St. Louis MO 350,759 Rocky Mount NC 56,844
Wellston MO 2,325 Winston-Salem NC 215,348
Bay Springs MS 2,182 Grand Forks ND 51,740
Belzoni MS 2,418 Lincoln NE 248,744
Beulah MS 437 Omaha NE 424,482
Biloxi MS 44,292 Clifton NJ 78,573
Coahoma MS 347 East Orange NJ 65,952
Columbia MS 6,538 Edison NJ 102,317
Crenshaw MS 911 Elizabeth NJ 124,862
Doddsville MS 98 Hamilton NJ 90,365
Friars Point MS 1,332 Irvington NJ 59,443
Goodman MS 1,203 Newark NJ 280,135
Greenville MS 36,178 Orange NJ 31,290
Greenwood MS 16,151 Piscataway NJ 52,565
Gunnison MS 590 Trenton NJ 82,804
Hattiesburg MS 50,233 Alamogordo NM 35,607
Itta Bena MS 1,892 Albuquerque NM 518,271
Jackson MS 175,710 Bayard NM 2,376
Jonestown MS 1,573 Espanola NM 9,549
Laurel MS 18,405 Las Cruces NM 89,722
Louise MS 282 Rio Rancho NM 75,978
Meadville MS 496 Santa Fe NM 73,199
Meridian MS 38,314 Silver City NM 9,977
Merigold MS 606 Henderson NV 249,386
Morgan City MS 282 Las Vegas NV 558,880
Mound Bayou MS 1,956 Mesquite NV 15,606
Natchez MS 16,637 Reno NV 214,853
Oakland MS 605 Sparks NV 87,139
Pace MS 361 Albany NY 94,172
Petal MS 10,617 Binghamton NY 45,020
Rosedale MS 2,355 Brighton NY 34,357
Sidon MS 563 Buffalo NY 272,632
Sumner MS 357 Freeport NY 42,418
Terry MS 785 Hempstead NY 51,785
Tutwiler MS 1,272 Jamestown NY 29,557
Webb MS 501 New Rochelle NY 73,260
Wesson MS 1,660 Rochester NY 206,759
Yazoo City MS 11,520 Schenectady NY 61,531
White Plains NY 57,398 Lancaster PA 54,672
Akron OH 207,934 Philadelphia PA 1,449,634
Brook Park OH 19,388 Pittsburgh PA 311,218
Canton OH 78,319 State College PA 39,893
Cincinnati OH 332,458 Wilkes-Barre PA 41,069
Dayton OH 155,461 York PA 40,226
Euclid OH 47,940 Añasco PR 30,139
Lakewood OH 51,305 Arroyo PR 19,012
Lima OH 37,936 Barceloneta PR 23,043
Lorain OH 70,124 Caguas PR 142,984
Marion OH 35,686 Camuy PR 39,370
Mentor OH 51,739 Ciales PR 20,572
Milford OH 6,313 Cidra PR 47,945
New Bremen OH 3,033 Corozal PR 38,839
North Olmsted OH 31,641 Gußnica PR 22,800
North Royalton OH 29,373 Hormigueros PR 17,524
Parma OH 78,785 Juana Diaz PR 52,978
Sidney OH 20,019 Lares PR 37,626
Stow OH 34,051 Las Marias PR 12,103
Strongsville OH 42,874 Manati PR 49,386
Toledo OH 295,029 Mayagüez PR 93,730
University Heights OH 12,753 Moca PR 44,308
Warren OH 44,270 Naranjito PR 29,980
Westlake OH 30,710 Patillas PR 20,007
Youngstown OH 73,818 Ponce PR 180,376
Zanesville OH 25,116 Salinas PR 32,153
Edmond OK 78,226 San Juan PR 424,951
Midwest City OK 55,935 Utuado PR 34,574
Moore OK 51,106 Yauco PR 48,240
Muskogee OK 40,015 Pawtucket RI 72,342
Norman OK 106,707 Providence RI 172,459
Oklahoma City OK 547,274 Warwick RI 85,097
Ponca City OK 24,590 Woonsocket RI 43,590
Sand Springs OK 18,450 Charleston SC 110,015
Sapulpa OK 20,908 Columbia SC 124,818
Tulsa OK 384,037 Hardeeville SC 1,930
Corvallis OR 51,125 Rock Hill SC 64,858
Eugene OR 149,004 Sumter SC 38,782
Gresham OR 99,721 Rapid City SD 63,997
Lake Oswego OR 36,698 Sioux Falls SD 151,505
Ontario OR 11,086 Cleveland TN 39,190
Oregon City OR 31,086 Germantown TN 37,317
Portland OR 550,396 Jackson TN 63,196
Salem OR 151,913 Johnson City TN 61,028
Allentown PA 107,117 Knoxville TN 183,546
Bethlehem PA 72,531 Allen TX 77,644
Cheltenham PA 36,875 Arlington TX 371,038
Harrisburg PA 47,196 Austin TX 743,074
Baytown TX 70,135 West Jordan UT 102,445
Beaumont TX 109,579 Alexandria VA 140,024
Bedford TX 48,985 Colonial Beach VA 3,716
Blue Mound TX 2,361 Fredericksburg VA 22,410
Brownsville TX 172,806 Hampton VA 146,439
Bryan TX 72,015 Lynchburg VA 71,282
Carrollton TX 123,799 Norfolk VA 235,747
Clarksville TX 3,508 Roanoke VA 92,600
College Station TX 80,315 Virginia Beach VA 434,743
Dallas TX 1,240,499 Burlington VT 38,531
Del Rio TX 36,582 Auburn WA 49,808
El Paso TX 606,913 Bellevue WA 121,347
Euless TX 52,337 Bremerton WA 34,075
Flower Mound TX 68,337 Brewster WA 2,090
Fort Worth TX 681,818 Bridgeport WA 2,014
Frisco TX 88,529 Cle Elum WA 1,876
Garland TX 218,792 Colville WA 4,949
Grand Prairie TX 158,422 Creston WA 225
Houston TX 2,208,180 Edmonds WA 40,139
Hurst TX 38,435 Everett WA 98,295
Irving TX 199,505 Fife WA 7,810
Killeen TX 112,434 Kettle Falls WA 1,572
La Porte TX 34,261 Kirkland WA 47,325
Laredo TX 217,506 Lakewood WA 57,231
Longview TX 76,816 Leavenworth WA 2,269
Lufkin TX 34,070 Longview WA 36,638
McAllen TX 127,245 Marcus WA 163
McKinney TX 115,620 Mattawa WA 3,281
Mesquite TX 131,738 Moses Lake WA 17,932
Missouri City TX 74,002 Northport WA 328
North Richland Hills TX 64,408 Okanogan WA 2,352
Pharr TX 63,681 Pacific WA 6,011
Port Aransas TX 3,775 Redmond WA 49,427
Rowlett TX 55,541 Renton WA 60,331
San Antonio TX 1,328,984 Riverside WA 327
Tyler TX 96,451 Seattle WA 594,210
Waco TX 122,222 Snoqualmie WA 7,516
Winnsboro TX 3,909 Spokane WA 200,975
Brigham City UT 18,544 Sumner WA 9,595
Herriman UT 16,769 Tacoma WA 196,520
Holladay UT 25,527 Tonasket WA 947
Murray UT 45,732 Vancouver WA 161,436
Orem UT 93,078 Wenatchee WA 29,810
Provo UT 117,592 Wilbur WA 877
Salem UT 5,903 Winthrop WA 373
Salt Lake City UT 180,651 Yakima WA 82,974
Sandy City UT 96,074 Yarrow Point WA 1,053
Taylorsville UT 58,620 Beloit WI 36,633
Cedarburg WI 11,056 Big Piney WY 476
Green Bay WI 100,781 Casper WY 53,003
Janesville WI 63,012 Dixon WY 80
Madison WI 228,775 Elk Mountain WY 197
Milwaukee WI 602,191 Hanna WY 862
New Berlin WI 39,016 La Barge WY 446
Racine WI 78,805 Marbleton WY 919
Sheboygan WI 48,130 Medicine Bow WY 267
Superior WI 617 Saratoga WY 1,737
Waukesha WI 66,762 Star Valley Ranch WY 668
Athens WV 1,180


City State Program Project
Descrip3on Funding
Required Jobs
Anchorage AK Airport Replace
Airport
Terminal
and
Administra3ve
Offices
(Merrill
Field) 








15,000,000
 50
Anchorage AK CDBG Connex3on
Day‐Hab
Center 












200,000
 5
Anchorage AK CDBG Catholic
Social
Services
Building 












600,000
 10
Anchorage AK CDBG Eagle
River
Town
Center
&
EOC 










2,000,000
 20
Anchorage AK CDBG Greenbelt
Trail
Resurfacing
and
Bridge
Repair 










3,000,000
 20
Anchorage AK CDBG Harry
J.
McDonald
Center 










3,000,000
 20
Anchorage AK CDBG Kids'

Corps
Building 










2,000,000
 20
Anchorage AK CDBG Mid‐town
Park 










3,000,000
 20
Anchorage AK CDBG Neighborhood
Park
Repairs 










3,000,000
 30
Anchorage AK CDBG Mountain
View
Arts
&
Culture
Center 










5,000,000
 40
Anchorage AK CDBG Covenant
House
construc3on 










5,000,000
 60
Anchorage AK CDBG Loussac
Library 








10,000,000
 60
Anchorage AK CDBG Anchorage
Neighborhood
Health
Center 








12,000,000
 80
Anchorage AK CDBG DHHS
Building 








12,000,000
 80
Anchorage AK Energy Streetlight
Retrofit
to
Energy‐Saving
LED
Technology 










7,000,000
 3
Anchorage AK Energy Trail
Ligh3ng
Retrofit 










2,000,000
 8
Anchorage AK Energy Municipal
Building
Retrofit
for
Energy
Efficiency 








10,000,000
 15
Anchorage AK Energy Materials
Recovery
Facility
(Recycling
and
Re‐use) 








15,000,000
 17
Anchorage AK Energy Landfill
Methane
Recovery
Project 










7,000,000
 20
Anchorage AK Public
Safety Anchorage
Domes3c
Violence
Preven3on
Project
‐
Vic3m
Outreach 












318,000
 3
Anchorage AK Public
Safety Community
Ac3on
Policing
Team
Expansion 












636,000
 6
Anchorage AK Public
Safety Misdemeanor/Theb
follow‐up
Unit 












636,000
 6
Anchorage AK Schools Mechanical
Upgrades 










1,881,000
 30
Anchorage AK Schools Fire
Alarm
Upgrades 












725,000
 40
Anchorage AK Schools Building
Renewal
Projects 










1,169,000
 50
Anchorage AK Schools Intercom/PA
Upgrades 












621,000
 50
Anchorage AK Schools Middle
School
Emergency
Communica3on
System 












820,000
 50
Anchorage AK Schools Districtwide
Electrical
Projects 










2,338,000
 60
Anchorage AK Schools Districtwide
Security
System
Upgrades 










2,588,000
 170
Anchorage AK Streets/Roads Minnesota
Rut
Repair 








15,000,000
 150
Anchorage AK Streets/Roads Lake
O3s
&
Tudor
Conges3on
Relief,
final
funding
component 










4,000,000
 180
Anchorage AK Streets/Roads Arterial
Rut
Repair
Debarr
Rd./Jewel
Lake
Rd./Pofer
Rd./Old
Klaf
Rd. 








20,000,000
 200
Anchorage AK Streets/Roads Old
Glenn
Hwy
Reconstruc3on
Phase
II 








25,000,000
 250
Anchorage AK Streets/Roads O'Malley
Road
Reconstruc3on 








30,000,000
 300
Anchorage AK Transit Bus
replacement 










7,700,000

Anchorage AK Transit Regional
Transit
Authority
Funding 










8,750,000
 12
Anchorage AK Transit Public
Transit
System
Security
and
Facility
Improvements 










2,500,000
 20
Anchorage AK Transit Bus
Warm
Storage
for
Expanded
Fleet 








20,000,000
 40
Anchorage AK Transit M&O
Vehicle
Maintenance
Facility 








19,000,000
 40
Anchorage AK Transit Port
of
Anchorage
Expansion
‐
fully
permifed,
ready
to
proceed
immediately,
will
create
1000‐1500
jobs.

 








75,000,000
 1500
Anchorage AK Water Eagle
River
Wastewater
Treatment
Facility
‐
UV
Disinfec3on
Upgrades 










4,500,000
 100
Anchorage AK Water Asplund
Wastewater
Treatment
Facility
‐
Generator‐Electrical
Rm
and
SCADA
upgrades 










6,000,000
 125
Anchorage AK Water Five
Sanitary
Sewer
Lib
Sta3ons
Upgrade 










5,300,000
 125
Anchorage AK Water Goldenview
Reservoir
(2
million
gallons) 










8,500,000
 125
Anchorage AK Water Hiland
Road
Water
Inter3e
(Phases
2
and
3) 








16,400,000
 125
Anchorage AK Water Replace
Hillside
Water
Transmission
Main 








19,500,000
 125
Anniston AL CDBG Coopera3ve
Economic
Development/Job
Crea3on
job
crea3on
ac3vi3es 








20,000,000
 180
Anniston AL CDBG Energy
conserva3on
&
retrofits
schools,
public
buildings 








28,450,000
 256
Anniston AL Energy Solar
energy
produc3on
‐
public
buildings/schools 








12,000,000
 108
Anniston AL Energy Coopera3ve
Energy
Projects 






120,000,000
 1080
Anniston AL Energy Abengoa
Solar
designed
100MW
solar
parabolic
trough
electric
genera3on
plant 






600,000,000
 3200
Auburn AL CDBG Drainage
Improvements 














85,000
 6
Auburn AL CDBG Community
Center
Improvements
 












355,000
 7
Auburn AL CDBG Street
Resurfacing
 












250,000
 14
Auburn AL CDBG Park
Improvements
 












425,000
 15
Auburn AL CDBG Sidewalk
Projects
 












300,000
 16
Auburn AL Housing Moton
Public
Housing
Demoli3on
 












400,000
 30
Auburn AL Streets/Roads St.
James
Street
Sidewalk 














32,315
 3
Auburn AL Streets/Roads Byrd
Street
Sidewalk 












127,100
 6
Auburn AL Streets/Roads Outer
Loop
Corridor
Study 












800,000
 6
Auburn AL Streets/Roads Alberta/Judd
Drainage
Improvements 














70,010
 9
Auburn AL Streets/Roads Cured‐In‐Place‐Pipe
FY09 














50,000
 9
Auburn AL Streets/Roads Cured‐in‐place‐pipe
(CIPP)
stormwater
drainage
rehabilita3on
projects 










1,000,000
 10
Auburn AL Streets/Roads Opelika
Rd
@
Guthrie's
Drainage
Improvements 












128,000
 10
Auburn AL Streets/Roads Sanders
St.
Sidewalk 












127,000
 10
Auburn AL Streets/Roads N.
Donahue
Bridge
Replacement 










1,725,000
 15
Auburn AL Streets/Roads Ross/Magnolia
Intersec3on 














95,000
 15
Auburn AL Streets/Roads S.
College/Longleaf
Dr
Intersec3on 












745,000
 18
Auburn AL Streets/Roads Wire
Road
Bridge
Replacement 












565,000
 18
Auburn AL Streets/Roads Donahue/Magnolia
Intersec3on
&
Resurfacing 












950,000
 20
Auburn AL Streets/Roads Road
Resurfacing
and
Reconstruc3on
‐
Selected
Roads. 








10,000,000
 35
Auburn AL Water Miscellaneous
Sewer
Rehabilita3on
Project 












700,000
 15
Auburn AL Water Airport
Terminal
Sewer
Extension 












400,000
 20
Auburn AL Water Timberwood
Interceptor
Reinforcement 










1,000,000
 22
Auburn AL Water Choctafaula
Interceptor
(Phase
II) 










3,500,000
 27
Auburn AL Water U3lity
Asset
Mapping
&
Maintenance
Project 










1,500,000
 30
Bessemer AL Airport Add
1500
feet
of
runway
to
the
exis3ng
main
runway. 










3,000,000
 12
Bessemer AL Airport Electric
Transformers,
ligh3ng
equipment
replacement
and
repair. 










3,000,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Bessemer AL Airport Airport
Terminal
Expansion
&
upgrade. 










3,000,000
 20
Bessemer AL Airport Hangar
construc3on
for
general
avia3on. 










2,000,000
 20
Bessemer AL Airport Runway
resurfacing.
And
taxi
way
improvements. 










3,600,000
 25
Bessemer AL CDBG Police
Training
Center
Equipment
and
Staffing. 












400,000
 2
Bessemer AL CDBG Computer
equipment
and
sobware
for
Community
Development
and
Finance
Departments
necessary
to

maintain
records,
manage
CDBG
funds
and
report
properly. 














31,500
 4
Bessemer AL CDBG Weed
and
Seed
program
for
at
risk
youth. 












750,000
 4
Bessemer AL CDBG Demoli3on
Equipment.
Purchase
equipment
for
demoli3on
of
condemned
structures.
 










1,123,000
 10
Bessemer AL CDBG Surveillance
cameras
for
Public
Housing
and
City
wide
in
areas
of
greatest
need. 










4,000,000
 10
Bessemer AL CDBG Concord
Landfill
Closure
project. 












650,000
 12
Bessemer AL CDBG Construc3on
of
Animal
Control
Facility. 










1,000,000
 12
Bessemer AL CDBG Residen3al
Energy
Efficiency
Project.
Energy
audits.
Energy
improvements. 










2,500,000
 12
Bessemer AL CDBG 4KV
Electric
System
replacement. 










2,000,000
 15
Bessemer AL CDBG Completely
renovate
Frank
House
Golf
Course
(Municipal).
Replace
greens.
Landscape.
Public
facili3es.











7,000,000
 15
Bessemer AL CDBG Brownfield
Railroad
bed
and
Bridge
demoli3on
and
removal.
Near
Hwy.
150. 










3,700,000
 20
Bessemer AL CDBG Construc3on
of
Police
Training
Facility. 












650,000
 20
Bessemer AL CDBG Lincoln
Theater‐Complete
historic
restora3on
of
African
American
theater
built
in
1911.
Working
mo3on

picture
theater.
Performing
Arts
Venu. 










3,000,000
 20
Bessemer AL CDBG Public
Park
Improvements.
Hard
Park
Walking
Track
–
ligh3ng,
park
furniture,
equipment.
Parking
lot.













600,000
 20
Bessemer AL CDBG Raimond
Heights
Landfill
Opening
project.
Purchase
compactor,
30‐ton
off‐road
truck,
Track
Excavator,
and

Office
Trailer.
 










1,490,000
 20
Bessemer AL CDBG City
wide
ditch
enclosure
and
sidewalk
construc3on

to
improve
pedestrian
safety. 










3,750,000
 24
Bessemer AL CDBG Install
Street
lights,
underground
wiring.
Remove
old
overhead
wiring.
City
Wide. 










3,000,000
 25
Bessemer AL CDBG Na3onal
Historic
District
Restora3on
for
mixed
use
business
and
residen3al. 










3,000,000
 25
Bessemer AL CDBG Renova3on
of
Cedar
Hill
Cemetery.
(Municipal).
Resurface
streets,
Construct
Shop
Building,
Purchase
Rubber‐
3re
backhoe. 












400,000
 26
Bessemer AL CDBG Arlington
School‐Conversion
of
Historic
High
School
to
Housing
for
the
Elderly.
Restora3on
of
500
Seat
Theater.

29
apartments.
Complete
external
and
internal
Historic
Restora3on.












2,500,000
 30
Bessemer AL CDBG New
City
Hall
and
Municipal
Center
with
three
level
parking
deck. 








21,000,000
 34
Bessemer AL CDBG Dolonah
Quarry‐Develop
Municipal
Park.
Walking
Trails.
Bicycle
Trails.
Picnic
Areas.
Swimming
Pool.
Boat
Dock.

Parking.
Park
Ranger
Sta3on.
Ligh3ng,
Amphitheater
,
Basic
Infrastructure.
 










5,000,000
 35
Bessemer AL CDBG Fleet
Maintenance
Facility
construc3on.
Complete
service
facility. 










5,000,000
 35
Bessemer AL CDBG Neighborhood
Mini‐Parks
Construct
eight
small
neighborhood
parks,
placed
throughout
the
City.
Four
Parks

will
be
designed
for
young
children
and
four
parks
will
be
designed
for
older
children.
Basketball
Courts,

Swings,
Carousels,
etc.
 










1,200,000
 35
Bessemer AL CDBG Construc3on
of
City
Jail
to
replace
41
year
old
facility. 










4,500,000
 52
Bessemer AL CDBG Community
Center‐Central
full‐service
center
for
all
ages.
Basketball
courts,
mee3ng
rooms,
tennis,
teaching

center,
Police
and
Fire
substa3ons 








16,000,000
 60
Bessemer AL CDBG Demoli3on
of
blighted,
unsafe
structures.
Remove
500
blighted
houses. 










4,000,000
 60
Bessemer AL CDBG Parking
Deck.
Four
story
Municipal
Parking
Deck,
serving
Historic
Downtown
Bessemer,
Jefferson
County

Courthouse.
 








16,000,000
 60
Bessemer AL CDBG Senior
Community
&
Recrea3on
Center.
Neighborhood
centers
designed
for
elderly
and
disabled.
(Two

centers). 










1,200,000
 60
Bessemer AL CDBG Affordable
Mixed
Income
Housing
Community.
Low
interest
construc3on
loans
to
developers
to
build
100

housing
units. 










3,000,000
 70
Bessemer AL CDBG Auto‐Meter
reading
system
for
City
wide
electrical
system
use. 










5,800,000
 70
Bessemer AL CDBG Fes3val
Fields
and
Park
Development
to
construct
a
regional,
recrea3on
and
art
facility
to
host
art
fes3vals
and

public
gatherings.
Three
city
blocks.
 










6,000,000
 90
Bessemer AL CDBG City
Wide
ADA
Sidewalk
Curb
and
Gufer
improvements. 








15,000,000
 100
Bessemer AL CDBG Modify
four
exis3ng
fire
sta3ons.
Construct
one
new
fire
sta3on.
Relocate/Construct
two
fire
sta3ons.
 








14,400,000
 170
Bessemer AL CDBG Backup
generators
for
main
electrical
system,
GPS,
Computers,
Vehicle
upgrades
and
miscellaneous
equipment

for
electric
u3lity. 










8,500,000
 185
Bessemer AL CDBG Brownfields
Improvements.
Redevelopment
of
Pullman
Standard
Plant.
Cleanup,
Landscaping,
CODE

improvements,
Infrastructure
Improvements.
Fencing.
Street
resurfacing.
Traffic
Lights.
Ligh3ng. 








12,000,000
 200
Bessemer AL Energy Bio‐diesel
manufacturing
facility. 












500,000
 6
Bessemer AL Energy Development
of
methane
produc3on
at
City
landfill. 










1,700,000
 10
Bessemer AL Energy Conversion
of
400
City
Vehicles
to
Natural
Gas. 










1,200,000
 12
Bessemer AL Public
Safety SRT
Mobile
Command
Center. 












250,000
 1
Bessemer AL Public
Safety Hire
Public
Safety
Dispatchers. 












240,000
 4
Bessemer AL Public
Safety Cold
Case
Unit. 












500,000
 6
Bessemer AL Public
Safety Metro
Drug
Task
Force. 












500,000
 10
Bessemer AL Public
Safety 30
Patrol
Vehicles
fully
equipped. 










1,280,000
 12
Bessemer AL Public
Safety Fill
vacant
Police
Officer
Posi3ons. 












500,000
 12
Bessemer AL Public
Safety Towing
service
and
construc3on
of
facility
for
related
equipment. 












500,000
 12
Bessemer AL Public
Safety Purchase
two
ladder
trucks
and
two
rescue
vehicles. 










3,000,000
 18
Bessemer AL Schools Energy
and
internet
infrastructure
improvements
in
City
Schools.
Install
internet
networks.
Replace
windows.

Insulate.
Replace
HVAC
systems. 








20,000,000
 32
Bessemer AL Streets/Roads GIS
mapping
system. 












400,000
 10
Bessemer AL Streets/Roads Installa3on
of
bridge
guardrails. 












400,000
 12
Bessemer AL Streets/Roads Avia3on
Road
widening
and
resurfacing
to
create
safe,
efficient
access
to
municipal
airport. 










5,000,000
 14
Bessemer AL Streets/Roads Construc3on
of
Public
Improvements
facility. 










2,200,000
 30
Bessemer AL Streets/Roads City
wide
traffic
signal
upgrade. 










4,100,000
 35
Bessemer AL Streets/Roads Bridge
Repairs
and
or
replacement

of
six
major
bridges
throughout
the
City. 










6,000,000
 50
Bessemer AL Streets/Roads Pave
and
repair
240
miles
of
city
streets.
Roads
of
various
widths.
Project
is
fully
planned
and
ready
for
bid.
 








70,000,000
 120
City State Program Project
Descrip3on Funding
Required Jobs
Bessemer AL Transit Transit
system
and
Transit
Center.
Main
transport
throughout
Bessemer.
Routes
to
hospital,
government
offices

and
major
shopping
facility. 










7,500,000
 32
Bessemer AL Water Waterline
metering
for
Ross
Bridge
and
Alabaster. 












125,000
 6
Bessemer AL Water Water
system
related
warehouse
upgrades.
Systems
control
upgrade. 










1,000,000
 9
Bessemer AL Water Well
drilling
for
supplemental
produc3on
and
supply
during
plant
face
down. 










2,200,000
 9
Bessemer AL Water Vehicle
upgrades
and
pumping
equipment
for
the
water
system. 










1,100,000
 13
Bessemer AL Water Automa3c
Meter
Reading
System.
GPS
equipment,
GIS.
Replace
exis3ng
manual
metering
system.











4,929,000
 15
Bessemer AL Water Install
new
storage
tank
for
Alabaster
service
area. 










2,100,000
 15
Bessemer AL Water Hydrants:
Upgrade,
Repair,
Install
new
water
hydrants
City
wide.
 












570,000
 25
Bessemer AL Water Security
&
Safety
Equipment
related
to
the
water
system. 












780,000
 27
Bessemer AL Water Treatment
equipment.
Laboratoy
equipment.
Chemicals.
Filtering.
Safety
tes3ng.
UV
protec3on.
EPA.











1,025,000
 32
Bessemer AL Water Various
major
Storm
Water
projects
throughout
the
City
(11
total)
 








15,000,000
 44
Bessemer AL Water Pump
Sta3ons
and
Pump
related
upgrades
and
repairs
throughout
the
City
water
system.
SCADA
system
&

monitors.
Replace
15th
St.
Sta3on. 










2,250,000
 55
Bessemer AL Water 
Clean,
seal,
refurbish,
and
paint
exis3ng
water
tanks.
Weld
safety
equipment. 










4,477,000
 61
Bessemer AL Water Resurface
and
widen
Avia3on
Road.
Main
access
to
airport
in
state
of
disrepair. 










5,800,000
 90
Bessemer AL Water Replace
Old
Water
Supply
Lines
–
6596’
less
than
1”
pipe.
Community
Supply
37,430”
less
than
1.5”.
Bessemer,

Hueytown,
Lipscomb
–
727,636’
less
than
1.5”
to
2”
pipe. 








25,553,000
 95
Bessemer AL Water Widen
and
resurface
seven
miles
of
Morgan
Road.
Improve
drainage. 










7,500,000
 120
Bessemer AL Water Install,
Upgrade,
Repair
water
lines,
both
large
and
small
service
lines.
Install
and
upgrade
metering

equipment.
Repair,
upgrade
and
install
valve
equipment.
Morgan
Rd.
Lipscomb. 








35,500,000
 140
Birmingham AL CDBG Learning
Tree
Park
‐
Ameni3es
(ligh3ng,
furniture,
etc.)
to
enhance
the
use
of
the
park. 












200,000
 30
Birmingham AL CDBG West
End
Walking
Track
‐
Neighborhood
amenity
to
encourage
walking
as
alterna3ve
mode
of
transporta3on. 












500,000
 30
Birmingham AL CDBG 19th
Street
Ensley
‐
Avenue
F
to
Ensley
Avenue
‐
Street
improvement
project. 










1,600,000
 50
Birmingham AL CDBG 30th
Way
North,
4700
Block
‐
Street
improvement
project. 












550,000
 50
Birmingham AL CDBG City‐wide
neighborhood
sidewalk
ADA
accessibility
improvements. 










4,000,000
 50
Birmingham AL CDBG F.
L.
Shuflesworth
Drive,
4300‐4500
Blocks
‐
Street
improvement
project. 












150,000
 50
Birmingham AL CDBG Florida
Avenue
‐
2nd
Street
to
8th
Street
Thomas
‐
Street
improvement
project. 












500,000
 50
Birmingham AL CDBG Sandy
Vista
Phase
II
‐
Two
to
three
block
street
improvement
project. 












500,000
 50
Birmingham AL CDBG Sandy
Vista
Phase
III
‐
Two
to
three
block
street
improvement
project. 












250,000
 50
Birmingham AL CDBG Sandy
Vista
Phase
IV
‐
Two
to
three
block
street
improvement
project. 












200,000
 50
Birmingham AL CDBG Wylam
Phase
III
‐
Two
to
three
block
street
improvement
project. 












500,000
 50
Birmingham AL CDBG 13th
Street
SW
‐
Mayfield
Ave
to
Northland
‐
Street
improvement
project. 












300,000
 75
Birmingham AL CDBG Park
Lawn
Avenue,
2500
Block
‐
Street
improvement
project. 














50,000
 75
Birmingham AL Energy E‐85
Fueling
Facili3es
‐
Construc3on
of
fuel
distribu3on
facili3es
to
make
E‐85
fuel
available
city‐wide
for
the

City's
fleet
vehicles. 












550,000
 50
Birmingham AL Streets/Roads 8th
Avenue
North
‐
Streetscape
improvements
from
Center
Street
to
3rd
Street
N. 












900,000
 40
Birmingham AL Streets/Roads 19th
Avenue
N
‐
Street
widening
improvements
from
East
Lake
Blvd
to
88th
Street
North. 












350,000
 50
Birmingham AL Streets/Roads City‐wide
ADA
curb
ramp
installa3on 








12,000,000
 50
Birmingham AL Streets/Roads 6th
Street
NW
‐
Street
widening
improvements
from
Five
Mile
Road
to
Carson
Road 












500,000
 75
Birmingham AL Streets/Roads Grants
Mill
Road
Bridge
‐
Bridge
replacement. 










1,000,000
 75
Birmingham AL Streets/Roads Mar3nwood
Lane
‐
Street
widening
improvements
from
Wildwood
Dr
to
Hillview
Dr. 










1,300,000
 75
Birmingham AL Streets/Roads City‐wide
infrastructure
repairs
‐
Sidewalks,
ligh3ng,
etc. 










1,000,000
 100
Birmingham AL Streets/Roads City‐wide
street
resurfacing 








30,000,000
 150
Birmingham AL Streets/Roads City‐wide
bridge
repairs 










1,000,000
 220
Birmingham AL Transit Intermodal
Facility
Expansion
‐
Parking
Deck
‐
Parking
deck
to
support
the
use
of
mul3modal
facility. 










8,000,000
 200
Birmingham AL Water Pafon
Park
Aera3on
System
‐
Aera3on
system
to
aerate
lake
to
prevent
algae
growth. 












500,000
 15
Birmingham AL Water Bridlewood
Ditch
‐
Concrete
box
culvert
project
to
improve
drainage. 










1,200,000
 50
Birmingham AL Water Oak
Ridge
Phase
II
‐
Sanitary
sewer
to
serve
an
unsewered
area
of
Birmingham. 










1,500,000
 75
Decatur AL CDBG Ingalls
Boat
Harbor
piping
inlets
curbing
and
paving
for
restroom
bldg
parking
lot
and
highway
20
turn
lane













325,000
 15
Decatur AL CDBG Burleson
Moun3an
off‐site
Sanitary
Sewer 












350,000
 25
Decatur AL CDBG Reto
fit
sidewalk
program
throughout
the
city 










3,000,000
 30
Decatur AL CDBG Sewer
extension
down
Alabama
State
Highway
67
(Beltline
Road)
to
Alabama
State
Highway
24
(Gordon
Terry

Parkway) 










5,500,000
 45
Decatur AL CDBG Stonegate
Single
Family
residental
subdivision
interstructure
project
building
of
street
curb,
gufer
u3lity

upgrade 










1,500,000
 75
Decatur AL Energy Retro
fiqng
city
hall
for
engergy
efficiency
and
ADA
compliance 










2,000,000
 20
Decatur AL Streets/Roads Buningtree
Connec3on
Summerwind
to
Tomahawk
Trail
extension 












700,000
 10
Decatur AL Streets/Roads Castlegate
Blvd
extension
from
Presbyterian
Dr
to
the
Mall 












325,000
 10
Decatur AL Streets/Roads Burningtree
Dr.
improvements
pipe
inlets
curbing
from
Old
Creek
Trail
to
Cherokee
Place 












550,000
 15
Decatur AL Streets/Roads Chapel
Hill
Road
Improvements 










2,500,000
 20
Decatur AL Streets/Roads Phase
2
and
Phase
3
of
City
Widing
Resurfacing
project 










2,271,000
 30
Decatur AL Streets/Roads Judge
Crow
Blvd
connec3ng
Auburn
Dr
and
Modaus
road 










4,000,000
 50
Decatur AL Streets/Roads Old
Moulton
Road
Improvements
from
West
Moulton
to
Highway
67
 










8,000,000
 100
Decatur AL Streets/Roads Highway
20
interchange 








50,000,000
 400
Decatur AL Transit Purchase
20
40‐passenger
buses
for
local
transporta3on
route
throughout
city
to
local
industry 










5,000,000
 30
Decatur AL Water Moulton
Heights
Sewer
Extension
Project 










5,000,000
 85
Decatur AL Water Flint
sewer
rehab
project.
replace
sewer
lines
to
parts
of
city
with
sewer
problems 










7,000,000
 100
Florence AL Streets/Roads This
project
will
construct
the
College
Street
Bridge
in
West
Florence,
a
low
income/high
poverty
area,
to
open

development
in
this
area
of
the
City. 










4,500,000
 50
Gadsden AL Airport ARFF
Crash
Truck 












700,000
 6
Gadsden AL Airport Airport
Fire
Sta3on‐modify
exis3ng
building 












300,000
 10
Gadsden AL CDBG Hoke
Street
Sidewalk
Construc3on
to
serve
new
Department
of
Human
Resources
Facility 












150,000
 5
Gadsden AL CDBG Construc3on
of
Banks
Park
Community
Center 












600,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Gadsden AL CDBG Historic
Downtown
Lob
Conversions 












500,000
 20
Gadsden AL CDBG Rose
Street
Drainage 












750,000
 20
Gadsden AL CDBG Miscellaneous
Street
Resurfacing 










1,000,000
 25
Gadsden AL CDBG Renova3on
of
Gadsden
Sports
Complex 












750,000
 25
Gadsden AL CDBG Tuscaloosa
Avenue
Drainage 










1,000,000
 25
Gadsden AL CDBG Oak
Park
Drainage 










1,200,000
 30
Gadsden AL CDBG Oakleigh
Estates
Road
&
Drainage
Improvements 










2,000,000
 40
Gadsden AL CDBG Conversion
of
former
General
Forrest
School 










3,000,000
 60
Gadsden AL Energy Green
Roof
Conversions 












500,000
 15
Gadsden AL Energy Energy
Retrofit
of
Historic
Downtown
Municipal
Buildings 










4,000,000
 75
Gadsden AL Housing Emma
Sansom
Homes‐safety‐related
repairs 












200,000
 5
Gadsden AL Housing Starnes
Park
Housing
Construc3on‐10
new
units 












800,000
 15
Gadsden AL Public
Safety Construct
and
equip
forensic
lab 










1,000,000
 5
Gadsden AL Schools Miscellaneous
Computer/Technology
Upgrades 










2,000,000
 20
Gadsden AL Schools Electrical
&
Telecommunica3ons
Op3miza3on
Program 










2,000,000
 30
Gadsden AL Schools Equipment
for
New
Career
Tech
Center
at
new
Gadsden
City
High
School 










3,000,000
 50
Gadsden AL Streets/Roads South
11th
Street
Widening 












350,000
 5
Gadsden AL Streets/Roads Tuscaloosa
Avenue
Bridge
Replacement 












750,000
 15
Gadsden AL Streets/Roads Black
Creek
Parkway
Signaliza3on
&
Turn
Lanes 












250,000
 20
Gadsden AL Streets/Roads Chestnut
Street
Bridge
Replacement 












200,000
 20
Gadsden AL Streets/Roads ADA
required
sidewalk
modifica3ons 










1,000,000
 30
Gadsden AL Streets/Roads Miscellaneous
Road
Improvements 










6,000,000
 60
Gadsden AL Streets/Roads 4‐Laning
of
Airport
Road
to
serve
new
plant 










6,000,000
 700
Gadsden AL Transit Replacement
of
large
trolleys
with
smaller,
environmentally
friendly
trolleys 












800,000
 5
Gadsden AL Transit Construc3on
of
trolley
stops/sta3ons 












900,000
 15
Gadsden AL Water Lookout
Mountain
Water
&
Sewer
Installa3on 










2,000,000
 30
Gadsden AL Water Miscellaneous
Water
&
Sewer
Replacement 








10,000,000
 70
Gadsden AL Water North
Gadsden
Water
&
Sewer
Replacement 








12,000,000
 80
Gadsden AL Water Airport
Road
Water
&
Sewer
Installa3on
to
serve
new
plant 










2,000,000
 700
Huntsville AL CDBG Lowe
Mill
and
Terry
Heights
Neighborhood
Parks 










1,000,000
 47
Huntsville AL CDBG Clinton
Avenue
Streetscape
Improvement 










1,500,000
 70
Huntsville AL CDBG Food
Co‐op/Grocery
Store
for
Terry
Heights
Neighborhood 










1,500,000
 70
Huntsville AL CDBG Ligh3ng
and
Repaving
Public
Parking
Lots 










1,500,000
 70
Huntsville AL CDBG Holmes
Avenue
Bridge
Replacement 










2,000,000
 95
Huntsville AL CDBG Clinton
Avenue
Bridge
Replacement 










2,500,000
 120
Huntsville AL CDBG Meridian
Street
Improvements
Phase
II 










2,600,000
 120
Huntsville AL CDBG Courthouse
Square
Improvement
Project 










2,873,000
 135
Huntsville AL CDBG Infrastructure
and
Drainage
Improvements:
Terry
Heights
and
Lowe
Mill
Neighborhoods 








10,000,000
 470
Huntsville AL CDBG Neighborhood
Stabiliza3on:
Terry
Heights
and
Lowe
Mill
Neighborhoods 








12,000,000
 565
Huntsville AL CDBG 3
Parking
Garages 








40,000,000
 1880
Huntsville AL Energy Natatorium
Back
Pa3o
Renova3on 












200,000
 10
Huntsville AL Energy Library
HVAC
and
Chiller
Retrofit 












400,000
 20
Huntsville AL Energy Hays
Preserve
Building‐
New
Green
LEED
Building 












750,000
 35
Huntsville AL Energy New
Green
LEED
Goldsmith
Schiffman
Preserve
Building 












750,000
 35
Huntsville AL Energy Greenbrier
Fire
Sta3on 










1,660,000
 75
Huntsville AL Energy Alterna3ve
(Rapid)
Fueling
Sta3on 










1,700,000
 80
Huntsville AL Energy Green
Cove
Fire
Sta3on 










1,700,000
 80
Huntsville AL Energy Brahan
Spring
Park
Landscape
Management
Facility 










2,000,000
 100
Huntsville AL Energy Energy
Efficiency
Upgrades
to
Calvary
Hills
and
West
Side
Neighborhood
Recrea3on
Centers
 










2,000,000
 100
Huntsville AL Energy North
Huntsville
Public
Safety
Facility
 










2,200,000
 105
Huntsville AL Energy LED
Traffic
Signaliza3on
and
Incandescent
Ligh3ng
Improvements
 










5,000,000
 235
Huntsville AL Energy New
Energy
Efficient
Fleet
Building 










5,000,000
 235
Huntsville AL Housing Replacement
of
ligh3ng
at
various
sites 












500,000
 25
Huntsville AL Housing Roofing
at
various
sites 










3,000,000
 50
Huntsville AL Housing Replacement
of
bathroom
fixtures
at
various
sites 










1,700,000
 80
Huntsville AL Housing Repain3ng
units
at
various
sites 










2,700,000
 125
Huntsville AL Housing Installa3on
of
energy
efficient
windows
at
various
sites 










4,500,000
 200
Huntsville AL Housing Rehabilita3on
of
150
mul3family
units 








12,000,000
 560
Huntsville AL Housing Construc3on
of
Gateway
Place
senior
housing
facility 








16,000,000
 750
Huntsville AL Public
Safety Crime
Preven3on
through
Crime
Analysis
Program‐Sobware
purchase 














65,000
 0
Huntsville AL Public
Safety Mobile
Repor3ng
Program‐
Replacing
225
police
in‐car
mobile
data
terminals 










1,020,000
 0
Huntsville AL Public
Safety Mobile
Video
Program‐Installa3on
of
175
in‐car
mobile
video
systems 










1,050,000
 0
Huntsville AL Public
Safety Safety
Advancement
for
Everyone
(S.A.F.E.)
Program‐Purchase
of
equipment
and
training 












350,000
 0
Huntsville AL Public
Safety Fill
vacant
police
officer
posi3ons 












875,000
 17
Huntsville AL Schools East
Side
Recrea3onal
Facility 










3,000,000
 140
Huntsville AL Schools South
Side
Recrea3onal
Facility 










4,000,000
 190
Huntsville AL Schools West
Side
Recrea3onal
Facility 










4,000,000
 190
Huntsville AL Schools Big
Cove
Elementary
School 








22,000,000
 1030
Huntsville AL Schools Lee
High
School
 








45,000,000
 2100
Huntsville AL Schools Local
Public
School
Moderniza3on/IT
Upgrade/Energy
Conserva3on 








50,000,000
 2350
Huntsville AL Streets/Roads Lake
Four
Repairs
at
Research
Park 












600,000
 30
Huntsville AL Streets/Roads Providence
Main
Street
Streetscape 










1,000,000
 47
Huntsville AL Streets/Roads Flint
River
Greenway
Phase
II 










1,500,000
 60
Huntsville AL Streets/Roads Stonemark
Infrastructure
Improvements 










1,500,000
 70
Huntsville AL Streets/Roads Taylor
Road
Extension 










1,500,000
 70
Huntsville AL Streets/Roads Extension
of
Big
Cove
Rd
to
Big
Cove
Creek 










2,000,000
 95
Huntsville AL Streets/Roads Balch
Road 










2,500,000
 120
Huntsville AL Streets/Roads California
Street
Bridge
Project 










2,500,000
 120
City State Program Project
Descrip3on Funding
Required Jobs
Huntsville AL Streets/Roads Franklin
Street
Bridge
Project 










2,500,000
 120
Huntsville AL Streets/Roads Galla3n
Street
Bridge
Project 










2,500,000
 120
Huntsville AL Streets/Roads Madison
Street
Bridge
Project 










2,500,000
 120
Huntsville AL Streets/Roads Taylor
Lane
Widening 










2,500,000
 120
Huntsville AL Streets/Roads Townsend
Street
Bridge
Project 










2,500,000
 120
Huntsville AL Streets/Roads Explorer
Blvd
Extension 










3,000,000
 140
Huntsville AL Streets/Roads Old
Madison
Pike
Improvements 










3,841,000
 180
Huntsville AL Streets/Roads Nance
Road
Improvements 










4,000,000
 190
Huntsville AL Streets/Roads Road
Extension
Research
Park 










4,000,000
 190
Huntsville AL Streets/Roads Beadle
Lane
Improvements 










5,000,000
 235
Huntsville AL Streets/Roads Church
Street
Bridge
Project 










5,000,000
 235
Huntsville AL Streets/Roads Jeff
Road
Widening 










5,000,000
 235
Huntsville AL Streets/Roads Hobbs
Island
Bridge
Project 










6,000,000
 280
Huntsville AL Streets/Roads Lifle
Cove
Road
and
Lifle
Cove
Greenway 










6,500,000
 300
Huntsville AL Streets/Roads Dug
Hill
Road/US
431
Intersec3on
Improvements 










7,100,000
 330
Huntsville AL Streets/Roads Mar3n
Road
Bridge
Project 








10,000,000
 470
Huntsville AL Streets/Roads Resurfacing
various
streets 








10,000,000
 470
Huntsville AL Streets/Roads Governors
Drive
Phase
II 








11,000,000
 520
Huntsville AL Streets/Roads Mar3n
Road
Widening
(Redstone
Gate
to
West
of
Wall
Triana
Highway) 








20,000,000
 940
Huntsville AL Streets/Roads Infrastructure
Improvements
for
Redstone
Arsenal
EUL
 








50,000,000
 2350
Huntsville AL Streets/Roads Memorial
Parkway
South
Overpass
(Byrd
Springs/Lily
Flagg/Mar3n
Rd)
for
Improved
Mobility
to
Redstone

Arsenal 








53,000,000
 2400
Huntsville AL Transit Procure
15
transit
buses
with
alterna3ve
fuel
capability

 










3,750,000
 0
Huntsville AL Transit Replace
2
trolley
buses
@
$250,000
each 












500,000
 0
Huntsville AL Transit Updated
Transit
Center
Message
Board 














15,000
 0
Huntsville AL Transit Install
15
bus
camera
systems
@$5000
each 














75,000
 3
Huntsville AL Transit Replace
bus
stop
signs
and
bus
maps 














25,000
 5
Huntsville AL Transit Install
25
bus
shelters
@
$5000
per
shelter 












125,000
 6
Huntsville AL Water County
Line
Road
Sewer
Extension 












630,000
 30
Huntsville AL Water Flint
River
Sewer
Extension 












735,000
 35
Huntsville AL Water Sewer
Abatement
Infrastructure
Projects 












750,000
 35
Huntsville AL Water Big
Cove
Sewer
Rehabilita3on 












800,000
 40
Huntsville AL Water Chemical
Root
Control
Applica3on
for
Spring
Branch
and
Aldridge
Creek
Sanitary
Sewer
Basins













800,000
 40
Huntsville AL Water Knox
Creek
Sewer
Extension 












787,500
 40
Huntsville AL Water Sanitary
Sewer
Rehabilita3on:
Test
and
Seal
Chemical
Grou3ng 












800,000
 40
Huntsville AL Water Logan/Vermont
Pump
Sta3on
Upgrade 










1,000,000
 47
Huntsville AL Water Spring
Branch
WWTP
‐
Digester
Upgrade 










1,000,000
 47
Huntsville AL Water Sanitary
Sewer
Rehabilita3on:
Sanitary
Sewer
Evalua3onSurveys
(SSES)
 










1,200,000
 55
Huntsville AL Water Sanitary
Sewer
Rehabilita3on:
Cured
In
Place
Pipe
Installa3on
 










1,400,000
 65
Huntsville AL Water Sanitary
Sewer
Rehabilita3on:
Manhole
Rehabilita3on
for
Spring
Branch
&
Aldridge
Creek
Service
Basins











2,300,000
 100
Huntsville AL Water Ware
Park
Sewer
Project 










2,126,000
 100
Huntsville AL Water Restore
Historic
Big
Spring
Park
Drainage
Basin
 










3,000,000
 140
Huntsville AL Water Sanitary
Sewer
Rehabilita3on:
Line
Replacement 










3,500,000
 165
Huntsville AL Water Western
Area
Forcemain
Phase
III 










3,916,500
 185
Huntsville AL Water Western
Area
Interceptor
Phase
IV 










4,095,000
 190
Huntsville AL Water Western
Area
Pump
Sta3on
Phase
II 










4,011,000
 190
Huntsville AL Water Sanitary
Sewer
Rehabilita3on:
Pipe
Burs3ng 










4,200,000
 200
Huntsville AL Water Western
Area
16"
Forecemain
Phase
VI 










4,200,000
 200
Huntsville AL Water Western
Area
Interceptor
Phase
V 










4,242,000
 200
Huntsville AL Water Flood
Mi3ga3on
and
Drainage
Improvements 










4,645,000
 220
Huntsville AL Water Sewer
Capacity
Assurance
Program
and
Expansion 










5,500,000
 260
Huntsville AL Water Redstone
Arsenal
EUL
Sewer
 










7,000,000
 330
Mobile AL Airport The
City
of
Mobile
partners
with
our
Airport
Authority
for
two
major
airports.
Mul3ple
infrastructure
projects

for
upgrades
and
moderniza3on
to
support
buildings
and
roadways. 










2,180,000
 123
Mobile AL CDBG 
City
of
Mobile:
Mobile
Housing
Board
(MHB):
44
projects
including
construc3on
and
improvements
of
public

facili3es,
streets,
and
neighborhood
centers;
and
assistance
to
businesses
for
economic
development
and
job

crea3on/reten3on.
 








18,000,000
 216
Mobile AL Energy City
of
Mobile:
Mobile
Gas
Corp:
Main
reloca3on
and
renewal
for
the
EADS/Northrop
Grumman
facili3es
that

will
be
built
on
the
Brookley
Industrial
Complex.

 












500,000
 120
Mobile AL Energy The
City
of
Mobile
and
Alabama
Power
Company,
(A
Southern
Company),
"Re‐powering
an
Electric
U3lity
Coal

Unit
with
100%
Biomass"‐
including
the
primary
electrical
genera3ng
facility
for
Mobile,
the
Barry
Steam
Plant.







100,000,000
 193
Mobile AL Energy City
of
Mobile:
Mobile
Gas
Corp:
Mul3ple
Reloca3on,
Renewal,
Refurbishment
Projects
to
maintain
and

upgrade
exis3ng
gas
transfer
infrastructure. 










2,941,300
 441
Mobile AL Public
Safety City
of
Mobile:
Police:
add
local
forensic
laboratory
capabili3es,
upgrade
IT
capabili3es,

support
the
NIBIN‐
Na3onal
Integrated
Ballis3c
Informa3on
Network,
assist
the
Na3onal
Security
Entry‐Exit
Registra3on
System

with
a
Mobile
Police
Interstate
 








15,571,000
 135
Mobile AL Public
Safety City
of
Mobile:
Fire‐Rescue:
Renova3on/
replacement
for
aging
facili3es;
Equipment
upgrades/
replacement;

Add
staff
and
training
for
exis3ng
needs;
New
facili3es,
equipment,
and
staff
for
recently
annexed
areas.









86,750,000
 1000
Mobile AL Schools City
of
Mobile:
Mobile
County
Public
School
System:
for
the
Survey
period
(2009‐2010),
we
have

sixty‐four

(64)
school
facility
projects
ranging
from
minor
to
total
renova3on,
school
addi3ons
and
new
schools
“ready‐to‐
go”.

 






360,000,000
 24375
Mobile AL Streets/Roads City
of
Mobile:
Replacement
of
67
year
old,
224
b
Michigan
Avenue
Bridge,
and
other
highway
related
capital

improvements. 










6,240,000
 138
City State Program Project
Descrip3on Funding
Required Jobs
Mobile AL Transit City
of
Mobile:
Wave
Transit:
expand
exis3ng
services,
increase
headway
frequencies,
add
services
to
the

newest
steel
produc3on
plant
now
under
construc3on
in
the
U.S.,
ThyssenKrupp
Stainless
USA,
LLC.









13,000,000
 10
Mobile AL Transit City
of
Mobile:
Waterfront
Terminal
Complex,
Mobile
Landing
Mari3me
Transporta3on
Center,
includes
hub

terminal
for
high
speed
passenger
ferry
service
for
bay
area
communi3es. 








52,000,000
 700
Mobile AL Water City
of
Mobile:
PWD:
Drainage
Infrastructure:
Bayou
Street
Underground
Drainage
System
Rehabilita3on
and

Improvements. 












300,000
 20
Mobile AL Water City
of
Mobile:
PWD:
Drainage
Infrastructure:
Concep3on
Street
Underground
Drainage
System
Repairs
and

Improvements. 










1,400,000
 30
Mobile AL Water City
of
Mobile:
PWD:
Drainage
Infrastructure:
Ice
House
Branch
Phase
II:
Channel
Improvements
from

Bankhead
Street
to
200’
south
of
Senator
Street.

 










1,100,000
 30
Mobile AL Water City
of
Mobile:
PWD:
Drainage
Infrastructure:
Lifle
S3ckney
Phase
IV:

Underground
and
Concrete
Culvert

Drainage
Improvements. 










2,500,000
 30
Mobile AL Water City
of
Mobile:PWD:
Drainage
Infrastructure:
Carlisle
Drive
Phase
IV
‐
Channel
Improvements:
Overlook
to

Carlisle
Drive. 










1,200,000
 30
Mobile AL Water City
of
Mobile:
PWD:
Drainage
Infrastructure:
Florida
Street
Phase
II:
Underground
Drainage
Improvements
. 










2,500,000
 35
Mobile AL Water City
of
Mobile:
PWD:
Drainage
Infrastructure:
Government
Street
Drainage
Improvements
Phase
IV:
Road

Widening
and
Drainage
Improvements. 










4,000,000
 45
Mobile AL Water City
of
Mobile:
Board
of
Water
and
Sewer
Commissioners:
Mul3ple
projects
ranging
from
repair
and

rehabilita3on
to
full
replacement
of
exis3ng
gravity
sanitary
sewer
infrastructure
to
combat
sanitary
sewer

overflows
(SSOs),
upgrades
to
sanitary
sewer
li 






178,310,000
 320
Mobile AL Water City
of
Mobile:
Public
Works:
19
infrastructure
projects
directly
related
to
rehabilita3ng
aging
water
and
sewer

infrastructure,
complying
with
sewer
overflow
issues,
and
promo3ng
source
water
protec3on.









36,000,000
 1400
Prichard AL CDBG Public
Recrea3on
Facili3es
‐
Infrastructure
expansions
and
upgrades 








11,280,000
 27
Prichard AL CDBG Downtown
Revitaliza3on 






249,114,977
 510
Prichard AL Energy Sanita3on,
Solid
Waste
and
Landfill
Development 








12,500,000
 300
Prichard AL Public
Safety Police
Department
Facili3es
upgrades,
expansions
and
new
euipment. 








11,168,750
 33
Prichard AL Public
Safety Fire/Rescue
Facili3es
upgrades,
expansion
and
new
equipment. 








14,000,000
 51
Prichard AL Streets/Roads Citywide
Infrastructure
Expansion
and
Upgrade 






358,574,000
 1400
Prichard AL Water 158
Coridor
Water
&
Sewer
Line
Expansion 








22,500,000
 500
Prichard AL Water Citywide
Water
&
Sewer
System
Upgrades 








50,000,000
 500
Tuscaloosa AL Streets/Roads Greensboro
Avenue
Revitaliza3on
Project
‐
This
seven
block
corridor
is
an
area
that
the
City
is
trying
to
reverse

declining
land
use
values.

The
proposed
project
is
designed
to
increase
private
investment
and
decrease
crime

in
the
area.

 










4,000,000
 50
Tuscaloosa AL Streets/Roads Hinton
Park
Road
Reloca3on
‐
This
project
will
relocate
an
exis3ng
road
that
runs
through
the
middle
of
a
large

inner
City
park
to
the
eastern
boundary
of
the
park.

Reloca3on
of
the
road
will
enhance
pedestrian
safety
in

the
park
and
an
adjoining
elementary
school











3,000,000
 60
Tuscaloosa AL Streets/Roads Loop
Road
Phase
3
‐
This
is
the
final
phase
of
road
improvements
to
Loop
Road
in
eastern
Tuscaloosa.

The

road
will
be
widened
to
two
12
foot
lanes
with
curb
and
gufer
and
sidewalks.

The
exis3ng
side
drainage

ditches
will
be
piped
and
covered.
 










2,500,000
 60
Tuscaloosa AL Water North
Regional
Sewer
Pump
Sta3on
‐
This
sta3on
will
serve
the
metropolitan
area
north
of
the
river.

The

regional
pump
sta3on
will
serve
areas
around
Lake
Tuscaloosa,
thus
elimina3ng
the
need
for
sep3c
tanks
in

exis3ng
and
new
homes. 










3,000,000
 50
Tuscaloosa AL Water Woodland
Forest
Drainage
Project
‐
Constant
flooding
in
the
heavily
residen3al
area
of

Woodland
Forest
will

be
minimized
when
this
project
is
complete.

This
project
will
emphasis
"green
techniques"
in
solving
the

drainage
problem
in
the
area. 










5,000,000
 70
Fayefeville AR Airport Install
High
Intensity
Runway
Ligh3ng 










1,000,000
 5
Fayefeville AR Airport Remove
Obstruc3ons
(trees)
South
end
approach
zone 














10,000
 5
Fayefeville AR Airport Rehabilitate
Runway
pavements 












200,000
 10
Fayefeville AR Airport Rehabilitate
Taxiway
pavements 












250,000
 10
Fayefeville AR Airport Widen
Taxiways
B,
C
and
F
from
40'
to
50' 












425,000
 10
Fayefeville AR Airport Construct
Aircrab
Maintenance
Facility
100X200 










2,000,000
 25
Fayefeville AR Airport Construct
Taxiway
G
from
Taxiway
E
to
South
Runway
End 










2,900,000
 25
Fayefeville AR Airport Construct
Terminal
Apron
Expansion
300X600 










2,850,000
 25
Fayefeville AR Airport Construct
West
side
Firehouse
for
Crash
Truck
and
Structure
truck 










1,250,000
 25
Fayefeville AR Airport Purchase/Develop
Aerospace
and
Technology
Park
+
167
Acres 










3,500,000
 25
Fayefeville AR Airport Terminal
Apron
Rehab 












350,000
 25
Fayefeville AR Airport Construct
20
GA
Sunscreens
&
Tie
down
Apron
Complex 










1,200,000
 40
Fayefeville AR Airport Construct
6
ea
60X60
Corporate
Hangars
w/parking 












400,000
 40
Fayefeville AR Airport Construct
East
Side
Business
Apron
300X1200 










5,700,000
 50
Fayefeville AR Airport Runway
16
RSA
Improvement
Project
(AIP
in
progress) 










4,000,000
 50
Fayefeville AR Amtrak Feasibility
Study
‐
Lifle
Rock
to
Fayefeville 












250,000
 5
Fayefeville AR CDBG energy
conserva3on
‐
non‐profit
facili3es 












400,000
 3
Fayefeville AR CDBG rehab
for
non‐profit
facility 












500,000
 4
Fayefeville AR CDBG target
area
street
&
sidewalk
improvements 












900,000
 4
Fayefeville AR CDBG target
area
water
and
sewer
improvements 












800,000
 4
Fayefeville AR CDBG expansion
of
community
center 










1,000,000
 10
Fayefeville AR CDBG rehab
for
resource
center 










1,000,000
 10
Fayefeville AR Housing Expand
Morgan
manor
‐
two
8‐unit
facili3es 










5,000,000
 5
Fayefeville AR Housing Rehab
PHA
High
Rise 










1,000,000
 20
Fayefeville AR Public
Safety Radio
System
Upgrade 










4,000,000
 0
Fayefeville AR Public
Safety Taser
Purchase 














83,700
 0
Fayefeville AR Public
Safety Civilian
Crime
Analyst 












150,000
 2
Fayefeville AR Public
Safety Motorcycle
Traffic
Patrol 












150,000
 2
Fayefeville AR Public
Safety School
Resource
Officers 












241,000
 4
Fayefeville AR Public
Safety Parks
and
Trail
patrol 












317,570
 5
Fayefeville AR Public
Safety 4th
Judicial
District
Drug
Task
Force 












470,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Fayefeville AR Streets/Roads AR
112
Hwy
Widening
(UofA
Agri
to
I‐540) 










3,000,000
 12
Fayefeville AR Streets/Roads Van
Asche
Extension
)Gregg
to
Hwy
112) 










4,000,000
 12
Fayefeville AR Streets/Roads U.S
71B
Safety
Enhancements(College
Avenue) 










6,300,000
 18
Fayefeville AR Streets/Roads U.S.
71B/Joyce
Street
intersec3on
improvements 










5,500,000
 18
Fayefeville AR Streets/Roads AR
16
Hwy
Widening
(Hwy
265
to
Falcon) 










9,000,000
 20
Fayefeville AR Streets/Roads Fulbright
Expressway/Gregg
Street
Interchange
Improv. 








10,000,000
 20
Fayefeville AR Streets/Roads Joyce
Street
Extension
to
I‐540 










7,500,000
 20
Fayefeville AR Streets/Roads U.S.
71B/Fulbright
Expressway
Interchange
Improv. 








12,000,000
 20
Fayefeville AR Streets/Roads AR
112
Hwy
Widening
(I‐540
to
Johnson
City
Limits) 








15,000,000
 22
Fayefeville AR Streets/Roads New
I‐540/Joyce
Street
Interchange 








14,500,000
 22
Fayefeville AR Streets/Roads AR
265
Hwy
Widening
(Joyce
to
Albright) 








22,000,000
 30
Fayefeville AR Streets/Roads I‐540/Fulbright
Expressway
Interchange
Improv. 








76,000,000
 200
Fayefeville AR Water Replace
Meter
Vault,
U
of
A
Farms
East
on
Garland 














46,000
 4
Fayefeville AR Water Paint
Baxter
Water
Tanks 












644,000
 5
Fayefeville AR Water Benson
Mountain
Pressure
Plane
Water
Storage
Tank 












161,000
 6
Fayefeville AR Water South
Mountain
Water
Pump
Sta3on
Repair
&
Replace 












207,000
 6
Fayefeville AR Water Water
Line
Replacement
‐
Lafayefe,
West‐College 














56,350
 6
Fayefeville AR Water Water
Loop,
Holland
Dr
(Farmington) 












507,150
 6
Fayefeville AR Water Water/Sewer
Installa3on
on
Shiloh,
North
of
Dorothy
Jeanne 












263,350
 6
Fayefeville AR Water Sewer
Lib
Sta3on
Backup
Power
Generators 












460,000
 8
Fayefeville AR Water Water
Line
Replacement
‐
Hwy
16E
White
River
Bridge 












520,950
 8
Fayefeville AR Water Sewer
Line
Replacement
‐
Crossover,
Cliffs
to
36"
Transmission 










1,721,550
 15
Fayefeville AR Water Sewer
Line
Replacement
‐
Happy
Hollow,
4th
to
36"
Transmission 










1,452,450
 15
Fayefeville AR Water Sewer
Replacement
‐
Elkins
Ouzall
Line 










1,742,250
 15
Fayefeville AR Water Water
Line
Replacement
‐
Dinsmore
Trail 










1,130,450
 15
Fayefeville AR Water Water
Line
Replacement
‐
Holly
&
Sang
Area 










1,429,450
 15
Fayefeville AR Water Water
Line
Replacement
‐
Jackson,
Kings,
Columbus 










1,135,050
 15
Fayefeville AR Water Water
Line
Replacement
‐
Overcrest
&
Mockingbird
Area 










1,179,900
 15
Fayefeville AR Water Innova3ve
Biosolids
Processing
Method 










8,000,000
 25
Fort
Smith AR CDBG Construc3on
of
new
playground
at
Tilles
Park
for
physically‐challenged
children 














40,000
 5
Fort
Smith AR CDBG Construc3on
of
new
sidewalk
on
Albert
Pike
Ave.
from
Grand
to
Spradling
and
repair
exis3ng
sidewalk
on
May

Ave. 












300,000
 5
Fort
Smith AR CDBG Repairs
to
sidewlaks
on
Lecta
Ave.,
North
13th
St.,
North
7th
St.,
North
5th
St. 












274,000
 5
Fort
Smith AR CDBG Construc3on
of
mul3‐purpose
trail 












150,000
 6
Fort
Smith AR CDBG Development
of
4
neighborhood
parks
‐
Texas
Road,
Leo
Fondren,
Briarcliff,
Williamson
Place 












426,000
 12
Fort
Smith AR CDBG Construc3on
of
new
restroom
facili3es
in
an
LMI
area
park 












200,000
 15
Fort
Smith AR CDBG Reconstruc3on
of
single
family
homes
occupied
by
eligible
households
that
have
founda3on
or
other
major

failures 












300,000
 25
Fort
Smith AR CDBG Cost
share
in
subdivision
project
for
LMI
home
construc3on
with
$6
million
leverage 












500,000
 30
Fort
Smith AR Streets/Roads Reconstruc3on
of
0.9
miles
of
Texas
Rd.
south
of
Cavanaugh
Rd. 










4,000,000
 25
Fort
Smith AR Streets/Roads Construc3on
of
1500
feet
of
Chad
Colley
Blvd.
in
the
Chaffee
Crossing
redevelopment
area
to
support

industrial
growth 










1,500,000
 30
Fort
Smith AR Water Wastewater
Supervisory
Control
and
Data
Acquisi3on
System 












600,000
 8
Fort
Smith AR Water Disposal
of
Water
Treatment
Plant
residuals 












450,000
 10
Fort
Smith AR Water Construc3on
of
deten3on
pond
and
drainage
channel
improvements,
Hon
Avenue
north
of
Park
Ave. 












600,000
 12
Fort
Smith AR Water Construc3on
of
Neighborhood
Storm
Drainage
Improvements
in
3
areas:
Barrington
Lane/Hillsboro
Lane;

Dallas
and
96th
Street;
Ballman
Road 












200,000
 12
Fort
Smith AR Water Midland
Avenue
30‐inch
Water
Transmission
Line
Construc3on 










3,570,000
 15
Fort
Smith AR Water Sub‐Basin
10
Wastewater
Collec3on
System
Rehabilita3on 










1,500,000
 15
Fort
Smith AR Water Neighborhood
Water
System
and
Fire
Protec3on
Improvements 










3,400,000
 16
Fort
Smith AR Water Construc3on
of
drainage
improvements
in
Mill
Creek
from
Cavanaugh
Rd.
downstream
to
South
28th
St.
and

realignment
of
South
28th
St.
with
U.S.
Highway
71B 










4,000,000
 20
Fort
Smith AR Water Sunnymeade
Basin
Relief
Sewer
‐
Phase
2 










1,500,000
 20
Fort
Smith AR Water Sunnymeade
Basin
Relief
Sewer
‐
Phase
3 










1,800,000
 20
Fort
Smith AR Water Lake
Fort
Smith
Water
Treatment
Plant
Backwash
Lagoon
Expansion 










3,500,000
 23
Fort
Smith AR Water Lake
Fort
Smith
Water
Treatment
Plant
4
million
Gallon
Clearwell
Storage 










4,400,000
 40
Lifle
Rock AR Airport Airport
Safety
‐
Enhance
Emergency
Response
Items 












600,000
 5
Lifle
Rock AR Airport Enhance
Terminal
Security/Surveillance
System 












400,000
 10
Lifle
Rock AR Airport Flight
Informa3on
Display
System 












180,000
 10
Lifle
Rock AR Airport Wildlife
Mi3ga3on
Efforts 












300,000
 10
Lifle
Rock AR Airport Westside
Run‐up
Pad 












500,000
 15
Lifle
Rock AR Airport Pave
Radar
Road 












500,000
 25
Lifle
Rock AR Airport Remove
and
Repave
Surface
Parking
Lots 










1,000,000
 25
Lifle
Rock AR Airport Replace
Taxiway
Kilo 










1,500,000
 25
Lifle
Rock AR Airport Replace
Taxiway
Lima 










1,500,000
 25
Lifle
Rock AR Airport Airport
Draining
‐
Northeast
Quadrant 










2,000,000
 35
Lifle
Rock AR Airport Airport
Draining
‐
Southwest
Quadrant 










2,500,000
 35
Lifle
Rock AR Airport Inline
Baggage
Screening
System 










2,500,000
 35
Lifle
Rock AR Airport Pedestrian
Bridge 










1,500,000
 35
Lifle
Rock AR Airport Perimeter
Security
System 










2,300,000
 40
Lifle
Rock AR Airport Renovate
Airport
Fire
Sta3on 










2,000,000
 45
Lifle
Rock AR Airport Runway
Safety
Area
Enhancement 












500,000
 50
Lifle
Rock AR Airport Complete
Airport
Perimeter
Road 










3,000,000
 75
Lifle
Rock AR Airport Extend
Taxiway
Charlie 










3,000,000
 75
Lifle
Rock AR Airport Replace
Taxiway
Bravo 










4,500,000
 75
Lifle
Rock AR Airport Replace
Taxiway
Charlie 










3,500,000
 75
Lifle
Rock AR Airport Replace
Taxiway
Delta 










3,500,000
 75
Lifle
Rock AR Airport Replace
Taxiway
Papa 










4,000,000
 75
City State Program Project
Descrip3on Funding
Required Jobs
Lifle
Rock AR Airport Terminal
Renova3on 






465,000,000
 400
Lifle
Rock AR Public
Safety Fiber
Op3c
Network
Backbone
on
Arterial
Network
(Traffic
Control
and
Video
Surveillance) 










5,300,000

Lifle
Rock AR Streets/Roads Arkansas
River
Trail 








15,000,000

Lifle
Rock AR Streets/Roads Baseline
Road
‐
Stagecoach
to
County
Line
(widening
and
overlay) 










1,200,000

Lifle
Rock AR Streets/Roads Bowman
Road
bridge
widening 












700,000

Lifle
Rock AR Streets/Roads Chenal
Parkway‐Shackelford
to
Highway
10
(Overlay) 










3,000,000

Lifle
Rock AR Streets/Roads Chester‐Markham‐Roosevelt
(Overlay) 












670,000

Lifle
Rock AR Streets/Roads Fourche
Dam
Pike
&
Lindsey
Road
Signal 












300,000

Lifle
Rock AR Streets/Roads Geyer
Springs
‐
65th
to
Baseline
Road 












610,000

Lifle
Rock AR Streets/Roads I‐440
&
Bankhead
Signal 














60,000

Lifle
Rock AR Streets/Roads I‐440
&
Fourche
Dam
Pike
Ligh3ng
and
Signaliza3on 












500,000

Lifle
Rock AR Streets/Roads Markham‐I‐30
to
Chenal
(Overlay) 










3,200,000

Lifle
Rock AR Streets/Roads Rahling
Road
‐
Chenal
to
Taylor
Loop
(Widening
and
Overlay) 










2,940,000

Lifle
Rock AR Streets/Roads Rahling
Road
Widening 












750,000

Lifle
Rock AR Streets/Roads South
Loop 










5,100,000

Lifle
Rock AR Streets/Roads Springer
&
I‐440
(Ligh3ng) 












850,000

Lifle
Rock AR Streets/Roads Taylor
Loop/Rahling
and
Hinson
Signaliza3ons 












250,000

Lifle
Rock AR Streets/Roads Thibault
Road
(Zuber
to
Frazier)
Widening 












380,000

Lifle
Rock AR Streets/Roads University
‐
Cantrell
to
Asher
(Overlay) 










1,300,000

Lifle
Rock AR Streets/Roads Wright
Avenue
Viaduct
(Overpass) 












670,000

Lifle
Rock AR Water Pumping
Plant
ImprovementsNew
Bar
Screen
‐
Jamison
Road
P.S. 














16,000

Lifle
Rock AR Water Pumping
Plant
ImprovementsReplace
Wet
Well
Covers
Jamison
PS 














25,000

Lifle
Rock AR Water Pumping
Plant
Improvementsz:
Woodland
Ridge
Pump
Sta3on
Telemetry 














25,000

Lifle
Rock AR Water Pumping
Plant
Improvements:
New
Bar
Screen
‐
Jamison
Road
P.S. 












225,000
 3
Lifle
Rock AR Water Pumping
Plant
Improvements:
Woodland
Ridge
PS
Improvements 












250,000
 3
Lifle
Rock AR Water Infiltra3on/Inflow
Analysis
to
iden3fy
areas
with
wet‐weather
overflows 












949,000
 10
Lifle
Rock AR Water Sewer
Treatment
Plant
Improvements 












982,175
 11
Lifle
Rock AR Water General
Plant
Facili3es
and
Equipment
 










1,192,620
 13
Lifle
Rock AR Water Fourche
Creek
Treatment
Plant
Engine
Generator
Replacement:
Principal
power
supply
at
Fourche
Creek

Treatment
Plant
is
through
three
digester‐gas
burning
engines,
each
coupled
to
electrical
generators.













1,276,146
 14
Lifle
Rock AR Water Elimina3on
of
Community
Service
Lines
on
36
proper3es 










2,133,163
 24
Lifle
Rock AR Water Trenchless
sewer
line
rehabilita3on
is
for
the
renewal
of
structurally
deteriorated
line
segments
that
contribute

to
non‐capacity
overflows.

Trenchless
methods
include
Cured
in
Place
Pipe
(CIPP)
and
Pipe
Burs3ng.












3,180,000
 35
North
Lifle
Rock AR Airport Terminal
Building 










1,200,000
 13
North
Lifle
Rock AR Airport Runway
Extensions 










1,360,000
 15
North
Lifle
Rock AR Airport Runway
5
&
23
Widening 










1,700,000
 18
North
Lifle
Rock AR CDBG Redwood
Drainage
System
Improvements 








18,000,000
 169
North
Lifle
Rock AR Public
Safety Officers
and
Equipment 












650,000
 10
North
Lifle
Rock AR Streets/Roads Pike
Avenue
Roundabout
(New
Construc3on) 












750,000
 8
North
Lifle
Rock AR Streets/Roads West
9th
Street
Extension
(New) 










1,200,000
 13
North
Lifle
Rock AR Streets/Roads Main
Street
Viaduct
(Renova3ons) 










1,000,000
 14
North
Lifle
Rock AR Streets/Roads Main
Street
Improvements 










2,000,000
 28
North
Lifle
Rock AR Streets/Roads Highway
167
Access
Road
(New) 










9,000,000
 96
North
Lifle
Rock AR Streets/Roads Fairfax
Rail
Cross
Bridge
(New) 








10,000,000
 107
North
Lifle
Rock AR Transit Trolley
Barn
Expansion 








18,000,000
 1
North
Lifle
Rock AR Transit New
Buses 










1,400,000
 3
North
Lifle
Rock AR Water Wastewater
Improvements 








14,000,000
 131
Pine
Bluff AR Airport Grider
Field
Road
Improvements
‐
This
project
provides
street
and
design
improvements
to
Hangar
Row
Road,

Thomas
Riggins
Road
and
Grider
Field/Ladd
Road.
The
project
involves
the
realignment
and
improvement
of

approximately
400
feet
of
Hangar
Row
Road.














498,240
 0
Pine
Bluff AR Airport Aircrab
T‐Hangar,
Phase
II
‐
Construc3on
of
a
new
hangar
will
allow
the
placement
of
eight
aircrab
in
the

facility
and
therefore
freeing
up
room
in
our
general
storage
hangars
for
more
aircrab
to
locate
at
Grider
Field. 












575,000
 10
Pine
Bluff AR Airport Airport
Fire
&
Emergency
Services
Substa3on
‐
Fire
and
Emergency
Services
has
iden3fied
the
need
for
a
fire

sub‐sta3on
at
the
Pine
Bluff
Municipal
Airport.
This
sub‐sta3on
will
allow
the
Pine
Bluff
Fire
Dept.
 












934,225
 40
Pine
Bluff AR Airport Airport
Terminal
Building
Renova3on
‐
The
city
plans
to
renovate
the
airport’s
terminal
building
to
improve

handicap
accessibility,
energy
efficiency,
passenger
accommoda3ons,
and
its
afrac3veness
to
businesses

seeking
to
locate
near
the
airport. 










2,100,000
 54
Pine
Bluff AR Airport Grider
Field‐Ladd
Road
/
Osborn
Road
Project
‐
This
project
involves
widening
these
roads
to
four‐lane
roads.
It

also
involves
reloca3ng
a
por3on
of
the
Grider
Field
Road
(new
construc3on)
so
it
lines
up
with
Osborn
Road.











5,200,000
 75
Pine
Bluff AR CDBG Fire
Department
Ladder
Truck
‐
The
city
requests
assistance
in
replacing
its
aging
stock
of
fire
trucks,
reducing

the
city's
ISO
ra3ng.
A
reduc3on
of
one
point
results
in
a
savings
of
$100
per
homeowner
per
year. 












720,000
 0
Pine
Bluff AR CDBG Eco‐Tourism
Development
for
Bayou
Bartholomew
‐
The
city
seeks
to
develop
tourism
around
1.78
mile‐long

nature
trail
along
this
eco‐tourism
afrac3on.

 












100,000
 3
Pine
Bluff AR CDBG Management
Systems
Technology
‐

Replacement
of
the
30‐year‐old
financial
management
system
with
an
integrated
financial,
human
resources,

and
city
services
management
system,
resul3ng
in
greater
efficiency
and

heightened
system
security.













330,000
 3
Pine
Bluff AR CDBG Walker
Lake
Project
‐
This
project
involves
construc3ng
a
small
dam
and
spillway
in
order
to
retain
suitable

water
levels.
The
project
will
also
minimize
any
poten3al
of
adverse
environmental
impacts
on
nearby

residences.
 














40,000
 6
Pine
Bluff AR CDBG Olive
Street
Sidewalk
Project
‐

This
project
involves
the
construc3on
of
a
sidewalk
on
the
west
side
of
Olive

Street
between
28th
Avenue
and
39th
Avenue.

 












400,000
 7
Pine
Bluff AR CDBG Downtown
Sidewalks
‐
Sidewalks
in
need
to
be
rehabilitated
to
improve
handicapped
accessibility
and
to

create
a
more
pedestrian‐friendly
environment.
This
project
supports
the
City’s

downtown
revitaliza3on

efforts. 












380,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Pine
Bluff AR CDBG Improvements
I‐530
/US
Highway
65B
‐
Ligh3ng,
signage,
and
landscaping
improvements
to
the
main

thoroughfare
that
leads
to
UAPB
and
downtown
Pine
Bluff,

enhancing
the
image
of
Pine
Bluff
as
the
gateway

to
Southeast
Arkansas.
 












700,000
 15
Pine
Bluff AR CDBG Conven3on
Center
Improvements
‐
Facility
repairs
and
ligh3ng
and
sound
equipment
upgrades
needed
to
remain
compe33ve
as
a
facility
for

afrac3ng
major
events
to
Southeast
Arkansas.
 










1,600,000
 20
Pine
Bluff AR CDBG Emergency
Rehabilita3on
‐
Repair
of
exis3ng
housing/emergency
repair
of
exis3ng
housing
units. 












375,000
 25
Pine
Bluff AR CDBG Former
Armory
as
Youth
Services
Center
‐
Funds
to
update
and
renovate
a
US
Army
Reserve
Armory
that
has

been
donated
to
the
City
to
serve
as
a
family
and
community
services
center.
 












500,000
 29
Pine
Bluff AR CDBG Pifs
Drainage
Project
‐
Elimina3on
of
flooding
condi3ons
and
reconstruc3on
of
three
bridges
at
street

loca3ons. 












600,000
 30
Pine
Bluff AR CDBG Removal
of
Dilapidated
Housing
and
Acquisi3on
‐
Dilapidated
housing
units
that
are
beyond
repair
will
be

demolished,
leading
to
decreased
criminal
ac3vity,
improved
neighborhood
housing
values,
and
quality
of
life

of
nearby
residents. 












860,000
 30
Pine
Bluff AR CDBG City
Water
Park
‐
This
project
involves
the
construc3on
of
a
recrea3onal
water
afrac3on
for
youth
and

families.
 










1,400,000
 40
Pine
Bluff AR CDBG Reconstruc3on
of
Street
Department
Compound
‐

Reconstruc3on
of
this
1938
facility
will
allow
for
a
safe

office
environment
for
employees
and
provide
a
modern
facility
for
maintenance
of
equipment
and
city

vehicles.

 










1,200,000
 49
Pine
Bluff AR CDBG Reloca3on
of
Fire
Sta3on
‐
Construc3on
of
a
new
sta3on
in
order
to
meet
all
applicable
ADA
and
other
federal,

state
and
local
codes. 










1,000,000
 49
Pine
Bluff AR CDBG Renova3on
of
Police
Facility
‐

Renova3on
of
a
donated
facility
entails
roof
repairs,
window
replacements,
new
HVAC
system,
plumbing

repairs
and
electrical
and
technology
upgrades. 












800,000
 49
Pine
Bluff AR CDBG Energy
Efficiency
Emergency
Rehabilita3on
‐
This
project
involves
making
weatheriza3on
improvements
to
the

exis3ng
housing
stock
for
the
elderly
and
low‐to‐moderate
income
residents.

 












400,000
 60
Pine
Bluff AR CDBG Mul3purpose
Recrea3onal
Center
‐

The
facility
will
offer
a
range
of
free
and/or
modest
cost
recrea3onal
programs
to
the
general
public.
 








10,000,000
 74
Pine
Bluff AR CDBG Bank
and
Shoreline
Stabiliza3on
‐
Bank
stabiliza3on
is
needed
along
the
southern
and
western
shorelines
of

Lake
Saracen
prior
to
trail
construc3on
for
Phases
III
and
IV.

 










2,000,000
 75
Pine
Bluff AR CDBG Willow
Street
and
Jean
Superblock
Project:
Reconstruc3on
of
five
city
streets.
to
support
affordable
housing

development. 










2,000,000
 75
Pine
Bluff AR CDBG Municipal
Court
‐
The
city
is
in
need
of
a
new
facility
for
its
municipal
court
in
order
to
deal
with
an
increased

number
of
offenders.
The
city
had
to
add
a
second
municipal
judge,
however,
there
is
only
one
courtroom

available. 










1,800,000
 150
Pine
Bluff AR CDBG Housing
Rehabilita3on/
Reconstruc3on
‐
Abandoned
and
dilapidated
housing
units
will
be
rehabilitated,

leading
to
decreased
criminal
ac3vity,
improved
neighborhood
housing
values,
and
quality
of
life.
 










1,200,000
 300
Pine
Bluff AR Energy Elevator
Equipment
Replacements
‐

The
city
will
install
energy
efficient
elevator
equipment
in
all
three
buildings
in
the
Pine
Bluff
Civic
Center

Complex.
 












200,000
 5
Pine
Bluff AR Energy Lights
for
Walking
Trail
‐
The
city
is
reques3ng
funds
to
install
solar‐powered
character
ligh3ng
along
a
walking

trail
to
make
it
safe
and
appealing
to
residents
and
tourists
during
evening
hours.
 












500,000
 5
Pine
Bluff AR Public
Safety LAN
Technology
–
The
city
seeks
to
develop
a
local
area
network
for
its
Civic
Center
Complex
as
well
as
upgrade

key
hardware
and
sobware. 












250,000
 3
Pine
Bluff AR Public
Safety GIS
Technology
‐
The
city
of
Pine
Bluff
seeks
to
integrate
data
pertaining
to
infrastructure,
land
use,
public

safety,
environmental,
and
other
uses
using
GIS
technology.
 












300,000
 5
Pine
Bluff AR Streets/Roads Bryant
Street
Widening
Project
‐

This
project
involves
widening,
reconstruc3ng,
and
installing
curbs‐and‐gufers
to
increase
safety
for
the

traveling
public
and
improve
access
from
I‐530
to
the
Dollarway
Road
commercial
corridor. 










1,300,000
 75
Pine
Bluff AR Streets/Roads Harding
Avenue
Widening
Project
‐

This
project
involves
widening
Harding
Avenue
to
reduce
traffic
conges3on
and
enhance
commercial

development
along
the
Harding
Corridor
located
between
Main
Street
and
the
Pines
Mall. 










4,250,000
 75
Pine
Bluff AR Streets/Roads Hazel
Street
Widening
Project
‐
Widening
Hazel
Street
to
a
five‐lane
street
between
Interstate‐530
and
13th

Avenue.

The
project
will
support
expansion
opportuni3es
of
the
local
hospital
and
community
college
located

along
the
corridor.
 








23,000,000
 75
Pine
Bluff AR Streets/Roads Main
Street
Widening
Project
‐

This
project
involves
widening,
reconstruc3ng
and
installing
curbs‐and‐gufers
to
increase
the
safety
for
the

traveling
public
and
neighborhood
residents.
 








10,900,000
 100
Pine
Bluff AR Streets/Roads Reconstruc3on
of
major
neighborhood
streets
in
revitaliza3on
area. 










2,000,000
 100
Pine
Bluff AR Transit Purchase
four
35
foot
transit
buses.
These
will
improve
the
reliability
of
the
transit
fleet. 












950,000

Pine
Bluff AR Transit Central
Transfer
Center
‐
Construc3on
of
an
inter‐modal
transporta3on
center
in
downtown
This
facility
will

s3mulate
the
local
economy
by
helping
to
bring
prospec3ve
customers
and
employees
downtown.














600,000
 22
Pine
Bluff AR Transit Reconstruc3on
of
Transit
Maintenance
Facility
‐
Facility
reconstruc3on
along
with
the
installa3on
and/or

replacement
of
key
maintenance
equipment,
including
new
bus
libs,
bus
engine
and
electrical
diagnos3c

machines
and
others. 












750,000
 49
Pine
Bluff AR Water Sewer
Extension
at
US
Highway
79
B
‐
This
project
involves
the
extension
of
a
sewer
main
along
US
79B

(University
Drive)
from
Watson
Blvd
to
McFadden
Road. 












500,000
 7
Pine
Bluff AR Water Storm
Drainage
System
‐The
storm
drainage
system
in
Pine
Bluff
is
approximately
90
to
100
years
old
and
is
in

need
of
replacing
and/or
repairing.
 










3,000,000
 18
Pine
Bluff AR Water Sewer
Development
and
Expansion
‐
Pine
Bluff
Wastewater
U3lity
is
reques3ng
funds
to
provide
sewer
service

to
unsewered
areas
in
the
city
limits
of
Pine
Bluff.


 










2,000,000
 30
Pine
Bluff AR Water Sewer
Extension
at
Interstate
530
and
US
Highway
63
‐
This
project
involves
the
construc3on
of
a
new
pumping

sta3on
and
the
extension
of
a
sewer
main
south
of
I‐530
along
US
Highway
63.
 










3,000,000
 50
Springdale AR Airport Feasibility
Study
for
Runway
Extension 












600,000
 10
Springdale AR Airport POFZ
Remedia3on
‐
Holding
Apron
&
Connector
Taxiway 












150,000
 20
Springdale AR Airport Runway
&
Taxiway
Crack
Clean/Seal
Coat 












150,000
 20
Springdale AR Streets/Roads Har‐Ber/Emma
Avenue
extension 








11,500,000
 100
Springdale AR Streets/Roads Reconstruc3on
of
Old
Wire
Road 








10,000,000
 100
City State Program Project
Descrip3on Funding
Required Jobs
Springdale AR Streets/Roads Widening
of
Highway
265
 










5,000,000
 100
Springdale AR Streets/Roads Interestate
interchange
at
Don
Tyson
Blvd. 








20,000,000
 150
Avondale AZ CDBG Energy
Packages
to
go
to
first
3me
home
buyers
who
purchase
foreclosed
homes
as
part
of
the
Neighborhood

Stabiliza3on
Program 












180,000
 20
Avondale AZ CDBG Coldwater
Park
Improvement
Project
‐
Add
mul3‐model
transporta3on
trail
head
and
ADA
accessibility
to

regional
trail
system 










2,000,000
 30
Avondale AZ CDBG Construct
Buckeye
Road
Medians
–
107th
Ave
to
Avondale
Blvd.
in
the
Cashion
District 










1,210,000
 40
Avondale AZ CDBG Hill
Street
Extension
‐
Acquire
right
of
way
and
complete
street
extension
and
drainage
improvements
to

eliminate
crime
and
blight 












400,000
 40
Avondale AZ CDBG Avondale
Community
Center
Expansion
&
Renova3on‐
Expand
and
renovate
exis3ng
12,000sf
community

center 










3,000,000
 45
Avondale AZ CDBG Central
Avenue
western
to
Van
Buren
–
Mill
and
overlay 










2,300,000
 46
Avondale AZ CDBG Van
Buren
Dysart
to
La
Jolla
‐
Rehabilita3on
work

$650,000
55 












650,000
 55
Avondale AZ CDBG Old
Town
Street
Rehabilita3on

$1,200,000
83 










1,200,000
 83
Avondale AZ CDBG Las
Ligas
District
project
‐
3
lanes
re‐construc3on
project
127th
Ave
Lower
Buckeye
to
Dysart 










1,400,000
 94
Avondale AZ CDBG Fes3val
Fields
Park
Development
–
Develop
a
regional
recrea3onal
facility
that
provides
quality
of
life

opportuni3es 










6,000,000
 100
Avondale AZ CDBG Fourth
Street
Clean
Up
–
A
Seven
acre
site
which
is
located
within
a
CDBG
area
contains
an
old
landfill
which

contains
but
not
limited
to:
metal
and
block
structures,
building
materials,
metal
storage
sheds
and
other

structures 










2,900,000
 120
Avondale AZ CDBG Water
Line
and
Sewer
Improvements
in
CDBG
designated
areas 










2,500,000
 150
Avondale AZ CDBG Old
Town
Avondale
Revitaliza3on
‐
‐
Reconstruct
streets
and
move
u3li3es
in
old
town
Avondale;
assist
to

stabilize
Western
Avenue
businesses
to
relocate
from
marginal
blighted
building
into
newly
constructed

business
spaces 








22,000,000
 600
Avondale AZ Energy Energy
Packages
to
go
to
first
3me
home
buyers
who
purchase
foreclosed
homes
as
part
of
the
Neighborhood

Stabiliza3on
Program 












180,000
 20
Avondale AZ Energy LED
Streetlight
Pilot
Program‐
To
change
out
our
street
lights
to
LED
fixtures 










4,000,000
 20
Avondale AZ Energy City
Facility
comprehensive
energy
management
retrofit‐
to
add
mo3on
ac3vate
switches,
replace
T‐12
and

incandescent
lights
with
T‐8
and
CFL;
Replace
low
efficient
AC
units 










1,000,000
 25
Avondale AZ Energy Northwest
Public
Safety
Facility
50kw
solar
energy
system 












500,000
 35
Avondale AZ Energy Municipal
Opera3ons
Service
Center
Solar
energy
system
‐
Installa3on
of
an
112kw
solar
energy
system 










1,000,000
 50
Avondale AZ Housing Avondale
Southwest
Valley
Fire
Preven3on
Program 












135,000
 2
Avondale AZ Housing Madison
Heights
Energy
Project
‐
Partner
with
local
u3lity
APS
to
provide
energy
efficient
appliances,

thermostats,
water
heaters,
shade
screens,
low‐flow
fixtures
and
other
CFL
light
fixtures 












387,000
 50
Avondale AZ Housing Madison
Heights
Projects
‐
Project
will
install
drainage
facili3es
such
as
catch
basins,
ditches,
and
storm
drain

to
reduce
flooding
in
this
CDBG
eligible
area/street 












800,000
 60
Avondale AZ Public
Safety Gang
Intelligence
and
Team
Enforcement
Mission
(GIITEM)
–
Will
train
police
officers
in
Gang
enforcement

strategies 












440,000
 2
Avondale AZ Public
Safety School
Resource
Detec3ve
–
Put
in
place
needed
SRD
at
school
sites 












600,000
 4
Avondale AZ Public
Safety Weed
and
Seed
–
To
improve
and
expand
the
youth‐at‐risk
development
program 












600,000
 4
Avondale AZ Schools Informa3on
Technology
improvements
to
provide
500
personal
computers
and
infrastructure
improvements

for
school
libraries,
classrooms
and
learning
centers 










1,500,000
 6
Avondale AZ Streets/Roads Hill
Street
Extension
‐
Extend
Hill
Street 












600,000
 35
Avondale AZ Streets/Roads Buckeye
Road:
Avondale
Blvd
to
117th
Alignment
‐
To
design
&
construct
sidewalks
and
landscaping 












600,000
 40
Avondale AZ Streets/Roads McDowell
Road:
Aqua
Fria
Bridge
to
119th
Avenue
(North
Side)
‐
Construct
pedestrian
improvements
on
the

north
side
of
McDowell
Road 












700,000
 40
Avondale AZ Streets/Roads Buckeye
Road
Medians:
107th
Avenue
to
Avondale
Blvd.
‐
Add
Medians 










1,200,000
 45
Avondale AZ Streets/Roads 10
&
Avondale
Blvd
‐
Sidewalks,
Art,
ADA
ramps,
grading,
paving
&
ligh3ng 












650,000
 55
Avondale AZ Streets/Roads Thomas
Road
(Alignment)
Rancho
Sante
Fe
to
119th
Avenue
‐
Pre‐Design
and
Design
for
a
mul3‐use
path,

bridge
and
ligh3ng
and
landscaping 












700,000
 55
Avondale AZ Streets/Roads Van
Buren
Street:
El
Mirage
to
122nd
Avenue
(North
Half)
‐
Add
1
westbound
through
Lane,
paving,
curb
&

gufer 












600,000
 55
Avondale AZ Streets/Roads OLD
TOWN
Street
Rehabilita3on
‐
Redo
local
Streets 










1,200,000
 60
Avondale AZ Streets/Roads Central
Avenue:
Western
to
Van
Buren
–
Mill
and
Overlay 










2,300,000
 65
Avondale AZ Streets/Roads Thomas
Road:
103rd
to
99th
Avenue
‐
Add
1
westbound
Lane 












750,000
 65
Avondale AZ Streets/Roads Woodrow
Street
Completed
from
Lower
Buckeye
to
Buckeye
Rd
through
Tank
Farm
Alignment
‐
Add
2‐lanes













500,000
 65
Avondale AZ Streets/Roads 127th
Avenue:
Lower
Buckeye
rd
to
Dysart
(Las
Ligas
District)
‐
Add
Sidewalk,
street
ligh3ng
&
landscaping,
also

red‐exis3ng
street 










1,400,000
 80
Avondale AZ Streets/Roads Avondale
Blvd:
Thomas
to
McDowell
Rd
‐
Add
2
through
lanes 










1,500,000
 90
Avondale AZ Streets/Roads Dysart
Road:
Harrison
Street
to
Lower
Buckeye
Road
‐
Construct
a
new
4‐lane
roadway 










4,600,000
 100
Avondale AZ Streets/Roads Van
Buren
St:
Avondale
Blvd
to
99th
Avenue
‐
Add
2
lanes 










8,075,000
 160
Avondale AZ Streets/Roads Clean
up
on
4th
Street 










3,000,000
 200
Avondale AZ Transit Bus‐to
purchase
a
fibeen
(15)
passenger
vehicle
to
transport
Senior
Ci3zens
and
at‐risk
youth
to
community

centers
and
community
service
agencies 














50,000
 1
Avondale AZ Transit Transit
shelters‐
to
purchase
and
install
twenty
(20)
transit
shelters
throughout
the
city 












400,000
 16
Avondale AZ Transit Park
and
Ride
–
15
acre
site 










5,200,000
 200
Avondale AZ Water Waste
Water
Pretreatment
‐
Will
assist
local
businesses
comply
with
legisla3ve
mandated
pre‐treatment
of

waste
waters
from
local
businesses 












500,000
 5
Avondale AZ Water Water
Sewer
Radio
Readings
–
Replace
an3quated
sewer
radios 










1,000,000
 10
Avondale AZ Water Well
Security
–
Provide
security
to
wells
and
water
systems 










1,200,000
 10
Avondale AZ Water Pre‐treatment
Educa3on
Program
‐
Will
train
staff
on
pre‐treatment
procedures
and
provides
resources
for

public
educa3on
for
legisla3ve
mandated
pre‐treatment
of
waste
waters









15,000,000
 20
Avondale AZ Water Purchase
Rigby
Water
Company 










4,200,000
 30
Avondale AZ Water Avondale
Blvd
Water
Line
improvements
–
Lower
Buckeye
Rd
to
Gila
River 










7,500,000
 35
Avondale AZ Water Water
Line
Replacement
–
Lower
Buckeye
to
Dysart 












800,000
 35
City State Program Project
Descrip3on Funding
Required Jobs
Avondale AZ Water McDowell
Road
Water
Line
Improvements
–
El
Mirage
to
Avondale
Blvd 










1,500,000
 54
Avondale AZ Water Madison
Heights
Drainage
Project
‐
Will
install
drainage
facili3es
such
as
catch
basins,
ditches,
storm
drain
to

reduce
flooding
in
this
CDBG
eligible
area/street 












800,000
 60
Avondale AZ Water 99th
Ave
Water
Line
Improvements
–
McDowell
Road
to
Thomas 










2,500,000
 69
Avondale AZ Water Thomas
Road
Water
Line
Improvements
–
103rd
Ave
to
99th
Ave 










1,400,000
 69
Avondale AZ Water Rehabilitate
exis3ng
Rigby
Water
Company 










4,000,000
 120
Bullhead
City AZ Streets/Roads Neighborhood
Street
Improvement
Plan.
Rebuild
and/or
repave:
McCormick
Blvd,
Miracle
Mile,
Mohave
Drive,

and
Bullhead
Parkway. 










8,000,000
 50
Bullhead
City AZ Streets/Roads Ramar
Rd/Gold
Rush/Arcadia
Blvd.
intersec3on
improvement. 










7,000,000
 50
Bullhead
City AZ Water 18‐1
&
18‐2
Lib
Sta3on
and
Gravity
Sewer
Improvements
to
mi3gate
increased
volume
resul3ng
from
sep3c

tank
removal
and
sewering
of
Bullhead
City. 










7,000,000
 25
Casa
Grande AZ CDBG Park
restroom
project.

New
prototype
restroom 












310,000
 10
Casa
Grande AZ CDBG Airport
apron
parking
(east
and
west).
Water,
Sewer,
Stormwater
and
Pavement
Improvements











1,500,000
 52
Casa
Grande AZ CDBG Len
Colla
Gymnasium. 










2,000,000
 70
Casa
Grande AZ CDBG Downtown
Street
Reconstruc3on.
Pavement,
u3lity,
landscaping
and
pedestrian
improvements 










3,000,000
 105
Casa
Grande AZ CDBG Burris
Sewer
Interceptor.
36"
sewer
and
18"
force
main. 










3,200,000
 112
Casa
Grande AZ CDBG Fire
Sta3on
504 










4,500,000
 157
Casa
Grande AZ CDBG Korsten
Rd
Sewer
Extension.
18,
24,
24,
and
36
inch
sewer
line
extensions. 










8,270,607
 289
Casa
Grande AZ CDBG Courthouse 








10,000,000
 350
Casa
Grande AZ CDBG Cofonwoad
Lane
widening
from
2
to
5
lane.
Aer3al
traffic
lights 










1,950,000
 437
Casa
Grande AZ CDBG Public
Safety
Facility 








21,000,000
 735
El
Mirage AZ Streets/Roads Dysart
Road
at
Peoria
Signal 












300,000
 2
El
Mirage AZ Streets/Roads Peoria
Avenue
Resurfacing 












500,000
 4
El
Mirage AZ Streets/Roads El
Mirage
Road
Resurfacing 










1,200,000
 10
El
Mirage AZ Streets/Roads Dysart
Road
Reconstruc3on
/
Widening 










1,600,000
 13
El
Mirage AZ Streets/Roads Downtown
Resurfacing 










2,500,000
 20
El
Mirage AZ Streets/Roads Dysart
Road
at
Thunderbird
Intersec3on
Improvements 










6,000,000
 48
El
Mirage AZ Water El
Mirage
Road
Sewer 










1,200,000
 9
El
Mirage AZ Water Cinnabar
Water
Campus 










4,500,000
 36
El
Mirage AZ Water Public
Works
Facility
at
WWTP 










7,000,000
 56
Flagstaff AZ Public
Safety School
Resource
Officers
for
two
high
schools
and
two
middle
schools 












292,000
 4
Flagstaff AZ Public
Safety Crea3on
of
a
selec3ve
enforcement
squad,
which
would
based
upon
comstat
analysis
and
communi3ty

policing
ini3a3ves,
provide
proac3ve,
problem
solving
tac3cs
to
combat
crime. 












438,000
 6
Flagstaff AZ Water AIRPORT
WELL
‐
construct
a
new
well
to
meet
water
supply
demands
during
droughts. 










1,450,000

Flagstaff AZ Water BEAVER
STREET
WATERLINE
‐
replace
approx.
1400
LF
of
undersized
waterline
and
replace
service
connec3ons.













218,000

Flagstaff AZ Water COLORADO
STREET
WATERLINE
RELOCATION
‐

relocate
approx.
400'
of
6"
waterline
so
that
all
of
the
line
is
in

the
public
right‐of‐way.

The
line
will
also
be
upsized
to
8". 














75,000

Flagstaff AZ Water CONNECT
THE
SINAGUA
WELL
‐
constract
power
lines
and
water
lines,
constrct
well
house
to
meet
water

demands
during
drought. 












950,000

Flagstaff AZ Water FRANKLIN
WATERLINE
REPLACEMENT
‐
replace
approx.
2300
LF
of
undersized
waterline.

Will
reduce

maintenance
and
improve
hydraulics. 












653,000

Flagstaff AZ Water FT.
TUTHILL
WATERLINE
LOOP
‐
extension
of
a
16"
water
transmission
main.

Will
provide
addi3onal
water

supply,
increase
fire
flows
and
replace
undersized
100
year
old
water
lines. 










2,200,000

Flagstaff AZ Water MOHAWK
DRIVE
WATERLINE
‐
replace
approx.
380
LF
of
undersized
waterline
and
provide
any
new
service

connec3ons
needed.

Will
reduce
maintenance. 












340,000

Flagstaff AZ Water SOUTH
BEAVER
STREET
SEWER
‐
replace
approx.
950
LF
of
undersized
sewer
line.

Will
reduce
maintenance. 












142,000

Flagstaff AZ Water SUNNYSIDE
IMPROVEMENTS
‐
replace
old,
undersized
waterlines
in
a
residen3al
neighborhood. 










2,118,000

Flagstaff AZ Water WEST
SIDE
INTERCEPTOR
IMPROVEMENTS
‐
replace
approx.
200
LF
of
8"
sewer
main
with
18"
PVC.

Will

increase
capacity
to
accommodate
projected
growth. 












700,000

Gilbert AZ CDBG Heritage
District
Redevelopment
Area
Sidewalks 












590,000
 50
Gilbert AZ CDBG Sonora
Town
Water,
Wastewater,
Streets
&
Street
ligh3ng
project 










1,500,000
 50
Gilbert AZ CDBG Heritage
District
Vaughn
Avenue
Parking
Garage
Economic
Development
Support
Project 










8,000,000
 100
Gilbert AZ Public
Safety Neely
Communica3ons
Tower
reconfigura3on 












300,000
 10
Gilbert AZ Public
Safety Joint
Police
and
Fire
Training
Facility 








30,000,000
 500
Gilbert AZ Streets/Roads Energy
Saving
Conges3on
Management
and
Traffic
Signal
Management
System 












400,000
 10
Gilbert AZ Streets/Roads Energy
Saving
Traffic
Signal
Installa3on
Germann
&
Quartz 












250,000
 10
Gilbert AZ Streets/Roads Energy
Saving
Traffic
Signal
Installa3on
Riggs
&
Adora
Trails 












250,000
 10
Gilbert AZ Streets/Roads Energy
Saving
Traffic
Signal
Installa3on
Riggs
&
Recker 












300,000
 10
Gilbert AZ Streets/Roads ST096
Recker
Road
‐
Ray
to
1,320
feet
North 










1,600,000
 50
Gilbert AZ Streets/Roads ST125
Higley
Road
Frye
to
Pecos
 










2,500,000
 75
Gilbert AZ Streets/Roads ST057

Greenfield
Road
Pecos
to
Germann 








17,000,000
 100
Gilbert AZ Streets/Roads ST076
‐
Chandler
Heights
Val
Vista
to
Greenfield 








18,500,000
 100
Gilbert AZ Streets/Roads ST081
Queen
Creek
Road
Val
Vista
Road
to
East
Maricopa
Floodway 










9,100,000
 100
Gilbert AZ Streets/Roads ST091

Cooper
&
Warner
Road
Intersec3on 










7,000,000
 100
Gilbert AZ Streets/Roads ST095
Williams
Field

‐
Railroad
to
Power 








50,000,000
 100
Gilbert AZ Streets/Roads ST098
Higley
Road
Riggs
to
Hunt
Highway
Arterial
Connec3on 










8,000,000
 100
Gilbert AZ Streets/Roads ST101
Greenfield
Road
Queen
Creek
to
Chandler
Heights 








13,000,000
 100
Gilbert AZ Water WW081
‐
Manhole
reloca3on
from
East
Maricopa
Floodway 












450,000
 10
Gilbert AZ Water WW082
Linda
Lane
Sewer
Tap
replacements 












400,000
 15
Gilbert AZ Water WW089
Elliot
District
Park
Recovery
Well 












700,000
 15
Gilbert AZ Water WW090
Direct
Reclaimed
water
injec3on
wells 












900,000
 15
Gilbert AZ Water WW044
Wastewater
Reclaimed
Water
System
Valve
sta3ons 












600,000
 25
Gilbert AZ Water Arsenic
Removal
Equipment
&
Treatment
Systems 










5,000,000
 50
Gilbert AZ Water WA067
‐
Service
Zone
Inter3e 












750,000
 50
Gilbert AZ Water WA068
‐
Well
20
Booster
Sta3on 












550,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Gilbert AZ Water WA076
‐
Western
Canal
20"
Water
Main 










2,500,000
 50
Gilbert AZ Water WA077
‐
Hobson
Street
12"
Water
line
replacement 












700,000
 50
Gilbert AZ Water WW091
Crossroads
Lib
Sta3on
Odor
Scrubber
replacement 










2,500,000
 50
Gilbert AZ Water WA069
‐
Higley
and
Baseline
Water
and
Sewer
Economic
Development 










3,600,000
 75
Gilbert AZ Water WW045
Gilbert
Road
Force
Main
and
Sewer 










7,000,000
 75
Gilbert AZ Water WW070
Candlewood
Lib
Sta3on
Improvements 










7,000,000
 75
Goodyear AZ CDBG Goodyear
Park
and
Ride
Bike
Storage
Lockers 












150,000
 5
Goodyear AZ CDBG Lib
Sta3on
Upgrade 










1,500,000
 5
Goodyear AZ CDBG Underdeck
Pedestrian
Ligh3ng
at
Bullard
Wash
I‐10
Bridge 












150,000
 5
Goodyear AZ CDBG Goodyear
Boulebard
University
Pedestrian
Crossing 










3,000,000
 10
Goodyear AZ CDBG Goodyear
Boulevard
Ballpark
Pedestrian
Crossing 










3,000,000
 10
Goodyear AZ CDBG Train
Depot 










1,000,000
 25
Goodyear AZ CDBG EMR
Park
Phase
II 










5,300,000
 30
Goodyear AZ CDBG Abandoned
Railroad
Cooridor
Rails
to
Trails 










7,000,000
 40
Goodyear AZ CDBG GWRF
Capacity
Expansion 










8,068,000
 40
Goodyear AZ CDBG Bullard
Wash
Linear
Park
and
Trail
System 








15,000,000
 100
Goodyear AZ CDBG City
Center
Infrastructure
Project
‐
Water,
Sewar,
and
Roadway 








10,000,000
 100
Goodyear AZ CDBG El
Rio
Riparian
Park
and
Trail
System 








20,000,000
 100
Goodyear AZ CDBG Library 








10,500,000
 100
Goodyear AZ CDBG Protec3on
of
Luke
AFB
‐
Property
Acquisi3on 








26,000,000
 100
Goodyear AZ CDBG RID/BID
Canal
Trails 








15,000,000
 100
Goodyear AZ CDBG City
Hall 








55,000,000
 200
Goodyear AZ CDBG Brownfield
Redevelopment
‐
Estrella
and
MC85 








55,000,000
 500
Goodyear AZ CDBG Unidynamics
Superfund
Cleanup 








20,000,000
 500
Goodyear AZ Public
Safety Crime
Scene
Tach 














20,000
 1
Goodyear AZ Public
Safety Driving
Simulator 












100,000
 1
Goodyear AZ Public
Safety Internet
Safety
Instructor 












100,000
 1
Goodyear AZ Public
Safety Prism
Firearms
Training
Simulator 














50,000
 1
Goodyear AZ Public
Safety Shoot
House 












100,000
 1
Goodyear AZ Public
Safety Staffing
Sobware 














25,000
 1
Goodyear AZ Public
Safety AFIS
Kiosk 














40,000
 2
Goodyear AZ Public
Safety Mobile
Command
Vechile 












200,000
 2
Goodyear AZ Public
Safety Police
Firing
Range 










2,000,000
 5
Goodyear AZ Public
Safety School
Resource
Officers 












500,000
 6
Goodyear AZ Public
Safety Police
Radio
System 










9,079,939
 15
Goodyear AZ Public
Safety City
Training
Facility 










3,860,000
 25
Goodyear AZ Public
Safety Police/Fire
Admin 








14,000,000
 100
Goodyear AZ Streets/Roads Chandler
Heights
Road,
Rainbow
Valley
Road
to
Western
City
Limits 












500,000
 5
Goodyear AZ Streets/Roads Litchfield
Road,
Indian
School
to
Wigwam 












350,000
 5
Goodyear AZ Streets/Roads Rainbow
Valley
Road,
Riggs
Road
to
Hunt
Road 












330,000
 5
Goodyear AZ Streets/Roads Sarival
Road,
Yuma
to
Durango 












330,000
 5
Goodyear AZ Streets/Roads Yuma
Road,
Sarival
to
167th
Avenue 












660,000
 5
Goodyear AZ Streets/Roads Chandler
Heights
Road,
Rainbow
Valley
Road
to
Reams
Road 












990,000
 10
Goodyear AZ Streets/Roads Estrella
Blvd.,
Vineyard
to
Elliot
Road 










1,100,000
 10
Goodyear AZ Streets/Roads SR303 








10,000,000
 10
Goodyear AZ Streets/Roads Chandler
Heights
Road,
Reams
Road
to
Bullard
Road 










1,300,000
 15
Goodyear AZ Streets/Roads McDowell,
Pebble
Creek
Pkwy
to
303 












105,881
 15
Goodyear AZ Streets/Roads Pebblecreek
‐
McDowell 












461,963
 15
Goodyear AZ Streets/Roads Thomas
Road,
Litchfield
to
Dysart 












560,000
 15
Goodyear AZ Streets/Roads Bullard,
I‐10
to
McDowell 












115,515
 20
Goodyear AZ Streets/Roads Elwood,
Cofon
to
Sarival 










1,200,000
 20
Goodyear AZ Streets/Roads Bullard,
Lower
Buckeye
Parkway
to
Estrella
Parkway 










6,000,000
 25
Goodyear AZ Streets/Roads Bullard,
Van
Buren
to
I‐10 










2,839,022
 25
Goodyear AZ Streets/Roads Bullard,
Bullard
Wash
to
Wood
Blvd. 








10,000,000
 35
Goodyear AZ Streets/Roads Goodyear
Blvd.,
SE
Corner 










4,000,000
 35
Goodyear AZ Streets/Roads MC85 










5,600,000
 35
Goodyear AZ Streets/Roads McDowell,
Litchfield
to
Bullard 












311,962
 35
Goodyear AZ Streets/Roads Yuma
Road
Bridge
over
Bullard
Wash 










6,000,000
 35
Goodyear AZ Streets/Roads Yuma
Road,
Estrella
Parkway
to
Litchfield 








13,000,000
 40
Goodyear AZ Streets/Roads Sonoran
Valley
Parkway 








53,000,000
 100
Goodyear AZ Streets/Roads Yuma
Road,
Estrella
to
Litchfield
Road 








11,000,000
 100
Goodyear AZ Transit Regional
Park
and
Ride 








11,500,000
 25
Goodyear AZ Water Lib
Sta3on
Upgrade 










1,500,000
 5
Goodyear AZ Water Wastewater
Collec3on
Lines 










1,500,000
 10
Goodyear AZ Water Historic
Goodyear
Waterline 










1,300,000
 15
Goodyear AZ Water Litchfield
Road
Waterline 










2,000,000
 20
Goodyear AZ Water PGA
South
Treated
Water
Line 










2,500,000
 20
Goodyear AZ Water Surface
Water
Pipelines 










3,000,000
 25
Goodyear AZ Water Water/Waste
Water
SCADA
System 










4,000,000
 30
Goodyear AZ Water Adaman
Water
Interconnect 










5,000,000
 35
Goodyear AZ Water Cofon
Lane
Water
Line
‐
EMR 










5,000,000
 35
Goodyear AZ Water Water/Waste
Water
Transmission
Lines 










5,000,000
 35
Goodyear AZ Water WRF
Capacity
Expansion 










8,000,000
 40
Kingman AZ CDBG Locomo3ve
Park
Train
Structure 












110,000
 15
Kingman AZ CDBG Lewis
Kingman
Park
Restrooms 












200,000
 25
Kingman AZ CDBG Railroad
Depot
Restora3on
Project 












650,000
 40
Kingman AZ Public
Safety Centennial
Park
Light
Replacements 












200,000
 20
Kingman AZ Public
Safety Fire
Sta3on
No.
5
 










3,650,000
 219
City State Program Project
Descrip3on Funding
Required Jobs
Kingman AZ Public
Safety Fire
Sta3on
No.
2
Reconstruc3on 










5,827,000
 272
Kingman AZ Streets/Roads Southern
Avenue
Sidewalk
Installa3on 














90,000
 8
Kingman AZ Streets/Roads Stockton
Hill
Road/Syacamore
Avenue
Restora3on 














80,000
 12
Kingman AZ Streets/Roads Topeka
Street
Sidewalk
Installa3on 












130,000
 12
Kingman AZ Streets/Roads Bank
Street
Overlay
Project 












300,000
 20
Kingman AZ Streets/Roads Western
Avenue
Street
Improvements,
Beverly
to
Airway 












350,000
 25
Kingman AZ Streets/Roads Mohave
Wash
Pathway 












500,000
 60
Kingman AZ Streets/Roads Hualapai
Mountain
Road
Reconstruc3on 










4,400,000
 265
Kingman AZ Streets/Roads I‐40/Kingman
Crossing
Traffic
Interchange 








27,095,000
 560
Kingman AZ Streets/Roads I‐40/Raflesnake
Wash
Traffic
Interchange
 








39,700,000
 625
Kingman AZ Water Chestneu
Street
Water
Line
Extension 














80,000
 7
Kingman AZ Water Metcalfe
Road
Water
Line
Replacement 












100,000
 8
Kingman AZ Water Mohave
Avenue/
Buchanan
Street
Water
Line
Replacement 












125,000
 10
Kingman AZ Water City
Well
No.
11
Booster
Sta3on 












400,000
 20
Kingman AZ Water City
Well
No.
11
Forebay
Tank 












500,000
 25
Kingman AZ Water City
Well
No.
11
Pumping
Equipment 












600,000
 25
Kingman AZ Water Fort
Beale
Water
Tank
Restora3on 












600,000
 25
Kingman AZ Water Mohave
Drive
24‐inch
Water
Transmission
Line 










1,200,000
 30
Kingman AZ Water Mohave
Channel
Sewer
Extension 












500,000
 35
Kingman AZ Water Hilltop
Treatment
Plant
Upgrade
and
Extension 








30,800,000
 620
Lake
Havasu
City AZ CDBG Site
Six
Ramp
Extension
(Safety) 














20,000
 3
Lake
Havasu
City AZ CDBG Fire
Dept
Open
Air
Apparatus
Storage
Facility/Carport 














90,000
 4
Lake
Havasu
City AZ CDBG Site
Six
Building
Demoli3on 














70,000
 4
Lake
Havasu
City AZ CDBG Site
Six
Dock
Shade
Structures 














40,000
 4
Lake
Havasu
City AZ CDBG Fire
Dept
Open
Air/Covered
Classroom
&
Support
Facili3es 












310,000
 6
Lake
Havasu
City AZ CDBG Fire
Dept
OSHA‐Required
Confined
Space
Training
Prop 












100,000
 6
Lake
Havasu
City AZ CDBG Fire
Dept
Paving
of
Training
Grounds 












162,200
 7
Lake
Havasu
City AZ CDBG Dick
Samp
Memorial
Park:
Environmental
Restora3on
of
Former
Landfill 












620,000
 10
Lake
Havasu
City AZ CDBG Pedestrian
Bridge
over
Bridgewater
Channel,
Channel
Riverwalk
District 










1,000,000
 10
Lake
Havasu
City AZ CDBG SARA
Park
3‐Phase
Power 












150,000
 10
Lake
Havasu
City AZ CDBG Windsor
Beach
Launch
Ramp
Courtesy
Docks
replacement 












200,000
 10
Lake
Havasu
City AZ CDBG CVB
Visitor
Informa3on
Center
w/
Public
Restrooms 












775,000
 14
Lake
Havasu
City AZ CDBG Island
Jogging
Path
Rehabilita3on 












350,000
 15
Lake
Havasu
City AZ CDBG New
Fire
Sta3on,
Mid
to
Low
Income
Area 










3,000,000
 19
Lake
Havasu
City AZ CDBG SARA
Park
Equestrian
Area
(grading,
restrooms,
power,
water,
grandstands) 












440,000
 25
Lake
Havasu
City AZ CDBG Specialist
Patrick
A.
Tinnell
Memorial
Sports
Park
Construc3on 










1,400,000
 25
Lake
Havasu
City AZ CDBG Site
Six
Building,
New
Construc3on 










1,330,000
 30
Lake
Havasu
City AZ CDBG Island/Channel
Special
Event
Parking 












750,000
 45
Lake
Havasu
City AZ CDBG Police
Facility
Parking
&
Entrance
Security 












350,000
 65
Lake
Havasu
City AZ CDBG Main
Street
Redevelopment:
Pima
Wash
Plaza
Area
Project,
public
space 








10,000,000
 75
Lake
Havasu
City AZ CDBG Economic
Synergis3c
Development:
Parking
Garage
at
Airport 










4,000,000
 79
Lake
Havasu
City AZ CDBG City
Hall
Parking
Lot
Expansion 












750,000
 85
Lake
Havasu
City AZ CDBG Police
Academy
Training
Building 












750,000
 85
Lake
Havasu
City AZ CDBG Dick
Samp
Memorial
Park
basketball
court,
dog
park,
road
and
u3lity
extension;
mul3purpose
field 










3,200,000
 90
Lake
Havasu
City AZ CDBG Dick
Samp
Memorial
Park
Facili3es 










3,200,000
 90
Lake
Havasu
City AZ CDBG Economic
Synergis3c
Development:
Airport
Terminal 










4,000,000
 90
Lake
Havasu
City AZ CDBG Rotary

Park
Restrooms,
Backstops,
Ramadas,
Infrastructure,
Effluent
Line
Extension,
Walkway
Ligh3ng 










3,200,000
 90
Lake
Havasu
City AZ CDBG Rotary
Park
restrooms,
backstops,
ramadas,
infrastructure,
effluent
line
extension,
walkway
ligh3ng











3,200,000
 90
Lake
Havasu
City AZ CDBG Economic
Syngergis3c
Development:
Business
Center
at
Airport 








16,000,000
 95
Lake
Havasu
City AZ CDBG Contact
Point
Economic
Development:
Performing
Arts
Center 










9,400,000
 100
Lake
Havasu
City AZ CDBG Mul3
Story
Parking
Structure,
Main
Street
Redevelopment 










6,600,000
 100
Lake
Havasu
City AZ CDBG Police
Dispatch
&
Evidence
Expansion 










5,880,000
 125
Lake
Havasu
City AZ CDBG SARA
Park
Recrea3on
Center
&
9
baseball‐sobball
fences 








19,000,000
 532
Lake
Havasu
City AZ CDBG SARA
Park
Recrea3on
Center/9
baseball‐sobball
fences 








19,000,000
 532
Lake
Havasu
City AZ CDBG MCC
Park:
mul3
use
path,
restrooms,
5
baseball/sobball
field
fences,
4
mul3purpose
fields,
4
parking
areas,

recrea3on
center,
science
center,
u3lity
extension 








26,800,000
 750
Lake
Havasu
City AZ Energy PWMFRetrofiqng/Parking
Structures
w/Solar
Power
Regenera3on
Energy
Savings
Project 










3,400,000
 60
Lake
Havasu
City AZ Energy Police
Facility
Solar
Panels 












400,000
 75
Lake
Havasu
City AZ Energy Community
Center,
Treatment
Plant
Retrofiqng/Parking
Structures
w/Solar
Power
Regenera3on
Energy

Savings
Project 










6,800,000
 120
Lake
Havasu
City AZ Energy City
Hall
Retrofiqng/Parking
Structures
w/Solar
Power
Regenera3on
Energy
Savings
Project 










7,280,000
 130
Lake
Havasu
City AZ Public
Safety Island
Towers
Public
Safety
Infrastructure
Security
System
and
Fencing 












165,000

Lake
Havasu
City AZ Public
Safety City
Hall
Public
Safety
Infrastructure
Video
Security
System 












110,000
 5
Lake
Havasu
City AZ Public
Safety City
Hall
Public
Safety
Emergency
Infrastructure
Power
System 












470,000
 8
Lake
Havasu
City AZ Public
Safety Public
Safety
Infrastructure
Tower
and
Digital
Repeater
System
 










1,250,000
 10
Lake
Havasu
City AZ Public
Safety Police,
Fire,
PW
Infrastructure
Digital
Radio
System 








75,000,000
 35
Lake
Havasu
City AZ Public
Safety City‐wide
Emergency
Alert
Radio
System 












150,000
 75
Lake
Havasu
City AZ Public
Safety Public
Safety
CAD
System
Upgrade 












850,000
 80
Lake
Havasu
City AZ Public
Safety Public
Safety
Wireless
Mesh
4.9
Network 










2,100,000
 125
Lake
Havasu
City AZ Streets/Roads Acoma‐S.
Palo
Verde
&
Acoma
Smoketree
Traffic
Signals
(Safety) 












500,000
 13
Lake
Havasu
City AZ Streets/Roads London
Bridge
Abutment
Repairs 












250,000
 15
Lake
Havasu
City AZ Streets/Roads Main
Street
Entry
Signs 












200,000
 15
Lake
Havasu
City AZ Streets/Roads SR
95
Streetscapes,
Mesquite
to
Alley
Parking
Area 












250,000
 15
Lake
Havasu
City AZ Streets/Roads Flood
Control:
Aqua
Wash
Culvert
Improvements
(McCulloch
Blvd) 












500,000
 25
Lake
Havasu
City AZ Streets/Roads Flood
Control:
Wash
Stabiliza3on
&
Flood
Warning
System
Projects 










1,000,000
 25
Lake
Havasu
City AZ Streets/Roads High
School
Bank
Restora3on
Project,
El
Dorado
Wash 












800,000
 25
City State Program Project
Descrip3on Funding
Required Jobs
Lake
Havasu
City AZ Streets/Roads London
Bridge
Roadway
Replacement/Texture 












350,000
 25
Lake
Havasu
City AZ Streets/Roads El
Dorado
Wash
Culvert
Improvements
(Lake
Havasu
Ave) 










1,000,000
 30
Lake
Havasu
City AZ Streets/Roads N.
Palo
Verde
Blvd
Widening
Phase
II 










1,000,000
 35
Lake
Havasu
City AZ Streets/Roads SARA
Park
Road
Widening 












520,000
 35
Lake
Havasu
City AZ Streets/Roads El
Dorado
Wash
Culvert
Improvements
(Palo
Verde) 










1,250,000
 40
Lake
Havasu
City AZ Streets/Roads Flood
Control:
Swanson
Box
Culvert
(Pima
Wash) 










1,250,000
 40
Lake
Havasu
City AZ Streets/Roads Smoketree
and
McCulloch
Overlay 










1,500,000
 50
Lake
Havasu
City AZ Streets/Roads McCulloch
(on
Island)
Repaving 










2,000,000
 65
Lake
Havasu
City AZ Streets/Roads Acoma
Overlay
Project 










2,000,000
 75
Lake
Havasu
City AZ Streets/Roads Island
Roadway
and
Drainage
Projects 










2,000,000
 75
Lake
Havasu
City AZ Streets/Roads Contact
Point
Economic
Development:
Roads,
Infrastructure,
Development
on
BLM
R&PP
Lease
to
City









10,200,000
 90
Lake
Havasu
City AZ Streets/Roads Flood
Control:
El
Dorado
Wash
Culvert
Installa3ons
(3) 










3,250,000
 100
Lake
Havasu
City AZ Streets/Roads Lake
Havasu
Avenue‐Widen 










4,150,000
 120
Lake
Havasu
City AZ Streets/Roads Sweetwater/Maricopa
Widening/Sidewalks 










4,000,000
 125
Lake
Havasu
City AZ Streets/Roads Residen3al
Flood
Control/Street
Widening:
Sewer
Area 










5,000,000
 200
Lake
Havasu
City AZ Streets/Roads SR95
Mul3
Use
Pathway
Extension
(14
miles) 










5,000,000
 200
Lake
Havasu
City AZ Streets/Roads Highway
95
Mul3‐Use
Pathway
Extension
(14
miles) 










5,250,000
 220
Lake
Havasu
City AZ Streets/Roads SR95
Streetscapes
(14
miles) 








10,000,000
 400
Lake
Havasu
City AZ Streets/Roads Residen3al
Flood
Control/Street
Widening:
Non‐Sewer
Area 








20,000,000
 1000
Lake
Havasu
City AZ Transit 6
Trolleys
(3
Routes
&
Tourism
Transporta3on
Services 










1,980,000
 9
Lake
Havasu
City AZ Water Booster
"A"
&
"C"
Demoli3on 












100,000
 5
Lake
Havasu
City AZ Water Sta3on
3C
Under‐Floor
Cathodic
System 












100,000
 6
Lake
Havasu
City AZ Water Bridgewater
Channel
Dredging
Safety
Project,
Federal
Waterway 












365,000
 9
Lake
Havasu
City AZ Water 30‐inch,
36inch
Interconnect
SR95 












120,000
 10
Lake
Havasu
City AZ Water Desert
View
Water
Main
Replacement 












250,000
 10
Lake
Havasu
City AZ Water Temperature
Control
at
WTP/Collector
Well
for
Pumps 












200,000
 10
Lake
Havasu
City AZ Water North
Havasu
Booster
Sta3on
(Airport) 












500,000
 15
Lake
Havasu
City AZ Water Sta3on
5A
Reservoir 










1,500,000
 15
Lake
Havasu
City AZ Water Water
System
Storage
Building 












350,000
 20
Lake
Havasu
City AZ Water Booster
Sta3on
No.
3
Reconstruc3on 










3,000,000
 25
Lake
Havasu
City AZ Water North
Havasu
Pump
Sta3on
Tanks 










1,000,000
 25
Lake
Havasu
City AZ Water Water
Treatment
Plant
Security
Wall 












500,000
 25
Lake
Havasu
City AZ Water SARA
Park
Water
Main 












690,000
 40
Lake
Havasu
City AZ Water SARA
Park
Water
Re‐Use
Conserva3on
Line 












590,000
 40
Lake
Havasu
City AZ Water Water
Booster
Sta3ons
1,
3
&
5 








10,000,000
 200
Lake
Havasu
City AZ Water Bill
Williams
Diversion
Project 








60,000,000
 800
Lake
Havasu
City AZ Water Wastewater
System
Expansion
Program
Comple3on 






161,507,000
 1500
Mesa AZ Airport Falcon
Field
4R
Run‐up
Area 










1,500,000

Mesa AZ Airport Falcon
Field
Airport
Anzio
Ramp
Expansion 












150,000

Mesa AZ Airport Falcon
Field
Airport
Anzio
Ramp
Expansion 










1,500,000

Mesa AZ Airport Falcon
Field
Airport
Automated
Weather
Observing
System 












250,000

Mesa AZ Airport Falcon
Field
Airport
Blast
Pads
‐
RWY
4L‐22R 












525,000

Mesa AZ Airport Falcon
Field
Airport
East
Ramp
Reconfigura3on 












300,000

Mesa AZ Airport Falcon
Field
Airport
East
Side
Aeronau3cal
Use
Taxiway 










2,500,000

Mesa AZ Airport Falcon
Field
Airport
Environmental
Assessment
for
TWY
F
construc3on 












100,000

Mesa AZ Airport Falcon
Field
Airport
Falcon
Field
Airfield
Storm
Drainage
System 












600,000

Mesa AZ Airport Falcon
Field
Airport
High‐Speed
Runway
Exits
for
RWY
4L‐22R 














75,000

Mesa AZ Airport Falcon
Field
Airport
High‐Speed
Runway
Exits
for
RWY
4L‐22R 












788,000

Mesa AZ Airport Falcon
Field
Airport
Higley
Ramp
Reconstruc3on 












180,000

Mesa AZ Airport Falcon
Field
Airport
Northwest
Quadrant
Access
Roads 












400,000

Mesa AZ Airport Falcon
Field
Airport
RWY
4R‐22L
PAPI/REIL
Upgrades 












325,000

Mesa AZ Airport Falcon
Field
Airport
RWY/TWY
Pavement
Preserva3on 












530,000

Mesa AZ Airport Falcon
Field
Airport
Taxiway
B
Reconfigura3on
&
Install
Runway
Guard
Lights 












150,000

Mesa AZ Airport Falcon
Field
Airport
Taxiway
B
Reconfigura3on
&
Install
Runway
Guard
Lights
(Phase
1) 










1,500,000

Mesa AZ Airport Falcon
Field
Airport
Taxiway
B
Reconfigura3on
&
Install
Runway
Guard
Lights
(Phase
2) 










1,500,000

Mesa AZ Airport Falcon
Field
Airport
TWY
F
Construc3on
(Phase
1) 










5,000,000

City State Program Project
Descrip3on Funding
Required Jobs
Mesa AZ Airport Falcon
Field
Airport
TWY
F
Construc3on
(Phase
2) 










5,000,000

Mesa AZ Airport Falcon
Field
Airport
TWY
F
Construc3on 












250,000

Mesa AZ Airport Phx‐Mesa
Gateway
Airport
Construct
Airfield/Apron
Drainage 










3,800,000

Mesa AZ Airport Phx‐Mesa
Gateway
Airport
Construct
Alpha
Apron 










6,000,000

Mesa AZ Airport Phx‐Mesa
Gateway
Airport
Construct
Taxiway
B
from
L
to
N 










9,000,000

Mesa AZ Airport Phx‐Mesa
Gateway
Airport
Construct
Taxiway
L
 










9,023,000

Mesa AZ Energy Gas
Gate
Sta3on
#3
and
8"
High
Pressure
Gas
Main
on
Power
Road;
Pecos
Road
to
Baseline
Road












3,356,000

Mesa AZ Energy Gas
Main
and
Water
Service
Replacement
in
Quarter
Sec3on
21C
Neighborhood 










3,000,000

Mesa AZ Energy SCADA
System
for
Natural
Gas
Distribu3on
System 












400,000

Mesa AZ Public
Safety Fire
Sta3on
#215
(Phoenix‐Mesa
Gateway) 










7,900,000

Mesa AZ Public
Safety Fire
Sta3on
#219 










4,400,000

Mesa AZ Public
Safety Fire
Sta3on
#318 










4,400,000

Mesa AZ Public
Safety Security
Site
Hardening
at
Various
City
Buildings 












400,000

Mesa AZ Streets/Roads Arterial,
Collector,
Residen3al
Overlays 








20,000,000

Mesa AZ Streets/Roads ASU
Polytechnic
Ring
Road
located
at
Phoenix‐Mesa
Gateway
Airport 








13,500,000

Mesa AZ Streets/Roads Broadway
Road,
Sossaman
Road
to
Hawes
Road 








14,300,000

Mesa AZ Streets/Roads Country
Club
Drive
ITS
Improvements 










2,509,641

Mesa AZ Streets/Roads Dobson
Road
and
Guadalupe
Road
Intersec3on 










5,500,000

Mesa AZ Streets/Roads Dobson
Road
and
University
Drive
Intersec3on 










6,500,000

Mesa AZ Streets/Roads East
Loop
ITS
Device
Deployment
(Red
Mountain
Freeway
and
US
60) 










3,000,000

Mesa AZ Streets/Roads Fiber
Op3c
Lines
‐
Signal
System
for
US
60
Connec3vity,
Phase
4B 










2,500,000

Mesa AZ Streets/Roads Gilbert
Road
and
University
Drive
Intersec3on 








12,000,000

Mesa AZ Streets/Roads Greenfield
Rd:
Baseline
Road
to
Southern
Avenue 










6,500,000

Mesa AZ Streets/Roads Hawes
Road:
Santan
Fwy
to
Ray
Road 










3,800,000

Mesa AZ Streets/Roads Mesa
Drive:
Southern
Avenue
to
US‐60
(Supers33on
Fwy) 








18,000,000

Mesa AZ Streets/Roads Power
Road:
Phase
III,
Santan
Freeway
to
Pecos
Road 








19,000,000

Mesa AZ Streets/Roads Ray
Road:
Sossaman
Road
to
Ellsworth
Road 








18,500,000

Mesa AZ Streets/Roads Santan
Freeway
ITS
Fiber
Backbone,
US
60
to
Power
Road 










2,000,000

Mesa AZ Transit Central
Mesa
‐
Light
Rail
3.5
miles
of
construc3on
and
u3lity
reloca3ons
extending
LRT
through
downtown

Mesa
to
Horne
Avenue 






290,000,000

Mesa AZ Transit Central
Phoenix/East
Valley
LRT
‐
Park‐and‐Ride
Expansion 








60,000,000

Mesa AZ Transit Central
Phoenix/East
Valley
LRT
‐
Park‐and‐Ride
Shade
Canopies
 








20,000,000

Mesa AZ Transit Central
Phoenix/East
Valley
LRT
‐
System
Enhancements
 








20,000,000

Mesa AZ Transit Downtown
Circulator
Fleet
Replacement 










2,000,000

Mesa AZ Transit Park
and
Ride;
Gilbert
Road
and
Red
Mountain
Freeway
(Loop
202) 










2,500,000

Mesa AZ Transit Park
and
Ride;
Power
Road
and
Red
Mountain
Freeway
(Loop
202) 










1,700,000

Mesa AZ Water Apache
Country
Club
Estates
Water
Line
Replacement 










1,351,000

Mesa AZ Water Diversion
Structures
at
Baseline/Ellsworth
and
Broadway/56th
Street 










1,300,000

Mesa AZ Water Drilling
and
Equipping
New
Well
Sites 










4,200,000

Mesa AZ Water Equipping
Well
Sites
 










2,100,000

Mesa AZ Water Falcon
Field
Water
Zone
Pump
Sta3on
#6 










1,000,000

Mesa AZ Water Flow
Diversion
Structure
for
Northwest
Reclama3on
Plant 










2,300,000

Mesa AZ Water Improvements
to
Water
Pump
Sta3ons 










2,800,000

Mesa AZ Water New
Sewer
Sulfide
Sta3ons 










3,000,000

Mesa AZ Water North
CAP
Water
Treatment
Plant
Improvements 










1,500,000

Mesa AZ Water Northwest
Water
Reclama3on
Plant
Improvements 










2,700,000

Mesa AZ Water Raw
Waterline
from
CAP
Canal
to
South
CAP
Water
Treatment
Plant 








10,034,244

Mesa AZ Water Rehabilitate
Wastewater
Crossings
under
US
60 










4,000,000

Mesa AZ Water Replacement
of
Aging
Residen3al
Water
Lines 










6,614,000

Mesa AZ Water Replacement
of
Water
Lines
in
Desert
Sands
Subdivision 










3,029,598

Mesa AZ Water Security
Improvements
at
Desert
Well
#11 












561,423

Mesa AZ Water Sewer
Line
on
Gateway
Avenue;
Crismon
to
Signal
Bufe 










1,400,000

Mesa AZ Water Sewer
Line
on
Rifenhouse
Road;
Power
Road
to
East
Mesa
Interceptor 










3,220,000

Mesa AZ Water Southeast
Water
Reclama3on
Plant
Improvements 










6,500,000

Mesa AZ Water Sunland
Springs,
Siphon
Draw
Flood
Control
Improvements 










8,230,524

Mesa AZ Water Upgrade
Electrical
Equipment
at
Well
Sites 










1,200,000

Mesa AZ Water Various
Storm
Sewer
Improvements 










8,000,000

Mesa AZ Water Various
Wastewater
Manhole
Rehabilita3on 










1,300,000

Mesa AZ Water Water
and
Wastewater
Improvements
on
ASU
Polytechnic
Campus
(Phase
II
and
III) 








14,700,000

Mesa AZ Water Water
and
Wastewater
Lines
on
Warner
Road;
Power
to
Ellsworth
Road 










5,688,000

Mesa AZ Water Water
Line
and
Gas
Line
Replacement
on
Broadway
Road;
Country
Club
to
Gilbert
Road 










3,675,000

Mesa AZ Water Water
Line
on
Elliot
Road;
Power
Road
to
Sossaman
Road 










1,000,000

Mesa AZ Water Water
Line
on
Elliot
Road;
Sossaman
Road
to
Hawes
Road 










1,500,000

Mesa AZ Water Water
Line
on
Ellsworth
Road;
Ray
to
Pecos
Road 










1,750,000

Mesa AZ Water Water
Line
on
Hawes
Road:
Elliot
Road
to
Ray
Road 










3,000,000

Mesa AZ Water Water
Line
on
Pecos
Road;
Signal
Bufe
to
Ellsworth
Road 










2,356,480

Mesa AZ Water Water
Line
on
Signal
Bufe;
Elliot
Road
to
Ray
Road 










3,000,000

Mesa AZ Water Water
Line
on
Signal
Bufe;
Ray
Road
to
Pecos
Road 










1,700,000

Mesa AZ Water Water
Line
on
Sossaman
Road,
1/2
mile
N.
of
Willamsfield
Road
to
Pecos
Road 










1,000,000

Mesa AZ Water Water
Line
on
Sossaman
Road;
1/2
mile
N.
of
Elliot
Road
to
Ray
Road 










1,100,000

City State Program Project
Descrip3on Funding
Required Jobs
Peoria AZ CDBG Rio
Vista
Emergency
Generator
for
emergency
cooling
shelters 












500,000
 5
Peoria AZ CDBG Sta3on
safety
upgrades 














76,600
 6
Peoria AZ CDBG Renovate
four
historic
school
buildings
within
the
historic
renova3on
guidelines 










2,000,000
 20
Peoria AZ CDBG Renovate
Peoria's
first
fire
sta3on
according
to
historic
preserva3on
guidelines 










1,000,000
 20
Peoria AZ CDBG 99th
Avenue
and
Olive
Road
Trailhead
 












750,000
 25
Peoria AZ CDBG Community
Park
#2 








27,500,000
 25
Peoria AZ CDBG New
River
Trail
Grand
Avenue
Underpass 












800,000
 25
Peoria AZ CDBG New
River
Trail:
Bell
Road
to
Union
Hills
Segment 












900,000
 30
Peoria AZ CDBG New
River
Trail:
Northern
to
Olive
Avenue
Segment 










1,200,000
 40
Peoria AZ CDBG Olive
Avenue/New
River
Trail
Underpass 










1,500,000
 40
Peoria AZ CDBG Osuma
Park
Renova3ons 










1,000,000
 40
Peoria AZ CDBG Peoria
Avenue/New
River
Trail
Underpass 










1,000,000
 40
Peoria AZ CDBG Peoria
Public
Safety
Support
Services
Facili3es 










6,685,000
 50
Peoria AZ CDBG Scotland
Yard
Neighborhood
Park 










2,000,000
 50
Peoria AZ CDBG Centennial
Park 










2,000,000
 60
Peoria AZ CDBG Palo
Verde
Cultural
Open
Space
and
Park 










2,000,000
 60
Peoria AZ CDBG Community
Center 








11,400,000
 100
Peoria AZ CDBG Peoria
Sports
Complex
Improvements 








12,500,000
 250
Peoria AZ Energy Recalk/seal
expansion
joints
in
five
municipal
buildings
at
135,000
square
feet 












150,000
 5
Peoria AZ Energy Add
solar
panels
to
two
exis3ng
parking
structures
with
covered
parking
at
municipal
office
complex













300,000
 8
Peoria AZ Energy Solar
electric
system
for
Peoria
Fire
Sta3on
‐
pilot
program 












400,000
 8
Peoria AZ Energy Install
alterna3ve
fueling
sta3on
and
fleet
shop
upgrades
(natural
gas
or
hydrogen) 










2,500,000
 11
Peoria AZ Energy Energy
efficiency
for
three
public
aqua3c
centers
‐
replace
exis3ng
motors
with
variable
frequency
drive,
install

VFD
on
HVAC
units,
add
mo3on
ac3vate
switches,
replace
lights
with
CFL,
replace
pool
covers
to
minimize
heat

loss. 












250,000
 20
Peoria AZ Energy City
Hall
Campus
Central
Plant
Upgrade 










3,600,000
 45
Peoria AZ Energy Add
covered
parking
to
two
exis3ng
parking
structure
along
with
solar
panels 










3,000,000
 80
Peoria AZ Public
Safety Administra3on
internship
program
for
at‐risk
women 














27,292
 2
Peoria AZ Public
Safety CAD
Replacement 










5,000,000
 10
Peoria AZ Public
Safety Target
Hardening
remodel
Public
Safety
Admin.
Building 










1,000,000
 24
Peoria AZ Public
Safety Municipal
Courts
Expansion
to
enhance
security
and
public
safety 








11,000,000
 30
Peoria AZ Public
Safety North
Municipal
Complex 








11,000,000
 30
Peoria AZ Streets/Roads Traffic
Management
Center 










1,478,200
 1
Peoria AZ Streets/Roads 75
Avenue/Greenway
Water
Treatment
Plant
Fiber
Op3cs 










2,399,192
 2
Peoria AZ Streets/Roads Lake
Pleasant
Road/Westwing/Jomax
Road
Fiber
Op3cs 










2,394,664
 2
Peoria AZ Streets/Roads 83
Avenue
and
Thunderbird
Intersec3on
Improvements 












500,000
 3
Peoria AZ Streets/Roads Drywells 












217,093
 3
Peoria AZ Streets/Roads Glendale
‐
Peoria
ADMP
Update 












450,000
 3
Peoria AZ Streets/Roads Washington
street
strom
drainage
alley 












386,000
 3
Peoria AZ Streets/Roads ADA
Sidewalk
Ramps 












600,000
 4
Peoria AZ Streets/Roads 103
Avenue
Street
Repair:
Olive
Avenue
to
Northern
Avenue
 












152,000
 5
Peoria AZ Streets/Roads 81
Avenue
1/2
street
improvements 












460,141
 5
Peoria AZ Streets/Roads 83
Avenue
Median:
Beardsley
Road
to
Village
Pkwy 










1,003,654
 5
Peoria AZ Streets/Roads 89
Avenue
and
Union
Hills
Drive
Structure
Upgrades 












459,440
 5
Peoria AZ Streets/Roads Traffic
Signal
Program 










9,343,805
 5
Peoria AZ Streets/Roads Lake
Pleasant
Parkway:
CAP
to
State
Route
74
(four
lanes) 










5,326,955
 6
Peoria AZ Streets/Roads 67
Avenue
and
Happy
Valley
Road
Intersec3on
Improvement 










1,229,782
 7
Peoria AZ Streets/Roads 67
Avenue
and
Peoria
Avenue
Intersec3on
Improvements 










1,235,861
 7
Peoria AZ Streets/Roads 67
Avenue
and
Thunderbird
Road
Intersec3on
Improvements 










2,106,321
 7
Peoria AZ Streets/Roads 67
Avenue:
Olive
Avenue
to
Thunderbird
Road 










3,880,268
 7
Peoria AZ Streets/Roads 83
Avenue
and
Deer
Valley
Road
Intersec3on
(interim) 










2,647,910
 7
Peoria AZ Streets/Roads 83
Avenue
Drainage:
Williams
Road
to
Calle
Lejos 










3,765,000
 7
Peoria AZ Streets/Roads Bell
Park
Sound
Wall 












636,704
 7
Peoria AZ Streets/Roads Esquire
Manor
Reconstruc3on 










1,997,413
 7
Peoria AZ Streets/Roads Lake
Pleasant
East
Reconstruc3on 










2,079,125
 7
Peoria AZ Streets/Roads Westwing
Substa3on
Access
Road 










1,000,329
 7
Peoria AZ Streets/Roads Thunderbird
Road
Widening/
Rehab:
L101
to
95
Avenue 








15,146,666
 8
Peoria AZ Streets/Roads 75
Avenue
and
Cactus
Road
Intersec3on
Improvements 










6,992,094
 10
Peoria AZ Streets/Roads 75
Avenue
and
Peoria
Avenue
Intersec3on
Improvements 










5,509,637
 10
Peoria AZ Streets/Roads 75
Avenue
and
Thunderbird
Road
Intersec3on
Improvements 










8,006,704
 10
Peoria AZ Streets/Roads 83
Avenue
Widening:
Williams
Road
to
Calle
Lejos 










7,127,115
 10
Peoria AZ Streets/Roads 87
Avenue
Storm
Drain:
Olive
Avenue
to
Monroe
Street 










3,402,196
 10
Peoria AZ Streets/Roads 87
Avenue
Storm
Drain:
Peoria
Avenue
to
Becker
Lane 












117,394
 10
Peoria AZ Streets/Roads 87
Avenue:
Olive
Avenue
to
Hatcher
Road 










2,383,722
 10
Peoria AZ Streets/Roads 91
Avenue
and
Olive
Avenue
Intersec3on 










3,776,388
 10
Peoria AZ Streets/Roads Butler
Drive
Storm
Drain:
79
Avenue
to
83
Avenue 










3,385,495
 10
Peoria AZ Streets/Roads 75
Avenue
Storm
Drain:
Cactus
Road
and
Sweetwater
Avenue 










2,394,202
 12
Peoria AZ Streets/Roads Happy
Valley
Road:
75
Avenue
to
Lake
Pleasant
Pkwy 








40,488,000
 12
Peoria AZ Streets/Roads Westbrook
Village
Court
Verdict
Drainage
Improvements 










5,917,271
 12
Peoria AZ Streets/Roads Rose
Garden
Lane
Channel 










9,091,021
 14
Peoria AZ Streets/Roads 83
Avenue
Realign:
Railroad
Crossing
and
Grand
Avenue
Intersec3on 










4,863,493
 15
Peoria AZ Streets/Roads 83
Avenue
Widening:
Mountain
View
Road
to
Olive
Avenue 










5,201,524
 15
Peoria AZ Streets/Roads 84
Avenue
Streetscape 










1,512,772
 15
Peoria AZ Streets/Roads Cofon
Crossing:
Monroe
Street
to
Mountain
View
Road 












989,520
 15
Peoria AZ Streets/Roads Pinnacle
Peak
Road
Widening:
107
Avenue
to
91
Avenue 










4,879,618
 15
Peoria AZ Streets/Roads Washington
Street
Storm
Drainage
Alley 












392,376
 15
Peoria AZ Streets/Roads Deer
Valley
Road
Drainage:
91
Avenue
to
83
Avenue 










3,572,945
 20
City State Program Project
Descrip3on Funding
Required Jobs
Peoria AZ Streets/Roads Street
ligh3ng
upgrade
and
replacement

‐
reduce
energy
demand
and
safety 










5,000,000
 20
Peoria AZ Streets/Roads Carefree
Highway
Dirt
Road
paving
to
enhance
air
quality
and
improve
safety 












260,000
 24
Peoria AZ Streets/Roads Arterial
overlay
recondi3on
major
city
arterials
(5
miles) 










5,000,000
 30
Peoria AZ Streets/Roads Castle
Hot
Springs
Road
to
enhance
air
quality
and
improve
safety 










1,000,000
 38
Peoria AZ Streets/Roads Residen3al
overlay
(5
square
miles)
‐
recondi3on
aging
residen3al
streets 








10,000,000
 40
Peoria AZ Transit Regional
Park
and
Ride
Lots
security
improvements
‐
enhance
security
for
park
and
ride
lots
users
and
vehicles,

improved
ligh3ng
in
parking
and
bus
stops
areas
with
upgraded
bulbs
and
residen3al
shielding,
add
closed

circuit
television
(CCTV),
internet
 














42,000
 1
Peoria AZ Transit Fixed
Route
bus
service
expansion
and
enhancement.
Increase
Fixed
Route
bus
service
opera3ons
to
seven

days
per
week
on
an
exis3ng
route
and
ini3ate
service
on
two
iden3fied
arterial
roadways
within
the
city











1,600,000
 2
Peoria AZ Transit Bus
purchase‐
purchase
five
new
buses
for
new
fixed
route
services
on
a
unserved
arterial
roadway
with
an

established
transit
need.
 










2,250,000
 5
Peoria AZ Transit Transit
bus
stop
infrastructure
(passenger
shelter,
pads,
ligh3ngs
and
ameni3es)
‐
purchase
and
installa3on
of

72
transit
passenger
shelters,
improve,
refurbish
and/or
replace
an
addi3onal
28
exis3ng
bus
stops
and

improve
ADA
access
in
support
of
new 










2,100,000
 5
Peoria AZ Transit Park
and
ride
lot
to
encourage
regional
mass
transporta3on 










3,800,000
 30
Peoria AZ Transit Transit
center
to
encourage
regional
mass
transporta3on 










1,700,000
 60
Peoria AZ Water PRV
Sta3on
Upgrades
‐
Cofon
Crossing
/75
Avenue/
Olive
Avenue 












550,000
 3
Peoria AZ Water PRV
Sta3on
Upgrades:
Cactus
and
91
Avenue 












454,500
 3
Peoria AZ Water 8
inch
waterline
Hatcher
Road:
75
Avenue
to
77
Avenue 










1,045,350
 6
Peoria AZ Water Stone
Well
Site
Rehab 










1,000,000
 6
Peoria AZ Water Edwards
Tract
Waterline
Improvements 










1,090,880
 7
Peoria AZ Water 99
Avenue
and
Rose
Garden
Well 










1,499,300
 9
Peoria AZ Water Northern
Avenue:
16
inch
waterline/
107
Avenue
and
103
Avenue 










1,434,000
 9
Peoria AZ Water 97
Avenue
and
Deer
Valley
Well 










1,700,000
 10
Peoria AZ Water Pinnacle
Peak
Road:
16
inch
waterline
New
River
to
82
Avenue 










1,868,500
 11
Peoria AZ Water Jomax
Booster
Sta3on
Upgrade
to
18
million
gallons
a
day 










2,080,600
 13
Peoria AZ Water 75
Avenue:
16
inch
waterline
‐
Cholla
Road
to
Thunderbird
Road 










2,439,150
 15
Peoria AZ Water 12
inch
waterline:
Pinnacle
Peak
and
67
Avenue 










2,676,500
 16
Peoria AZ Water Zone
2/3
booster
sta3on 










3,474,400
 21
Peoria AZ Water 91
Avenue:
24
inch
waterline/Beardsley
to
Union
Hills 










3,686,500
 22
Peoria AZ Water Northern/
95
Avenue
36
inch
Sewer
Rehab
phase
1 










4,317,511
 26
Peoria AZ Water Northern/
95
Avenue
36
inch
Sewer
Rehab
Phase
2 










4,317,511
 26
Peoria AZ Water Agua
Fria
West
PRV/Booster
Sta3ons
‐
Phase
1 










5,005,800
 30
Peoria AZ Water Beardsley
Road:
24
inch
waterline
‐
87
Avenue
to
Lake
Pleasant
Road 










7,484,100
 45
Peoria AZ Water Greenway
Water
Treatment
Plant
‐
5
Million
Gallon
Reservoir 










8,958,700
 54
Peoria AZ Water 91
Avenue
24
inch
waterline/Union
Hills
Road
to
Greenway
Road 










9,655,600
 58
Peoria AZ Water Greenway
Road
24
inch
waterline/91
Avenue
to
79
Avenue 










9,958,600
 60
Phoenix AZ Airport Deer
Valley
Airport
‐
Aircrab
Run‐Up
Area
Construc3on
Runaway
Safety
Ac3on
Team. 










2,000,000

Phoenix AZ Airport Deer
Valley
Airport
‐
Runway
Safety
Area
Grading. 










1,350,000

Phoenix AZ Airport Deer
Valley
Airport
‐
Runway
Safety
Areas
Improvements. 










9,251,988

Phoenix AZ Airport Deer
Valley
Airport
‐
South
Ramp
Reconstruc3on. 










4,894,839

Phoenix AZ Airport Deer
Valley
Airport
‐
Taxiway
Alpha
Reconstruc3on. 










8,620,000

Phoenix AZ Airport Deer
Valley
Airport
Signage
‐
Runaway
Safety
Ac3on
Team. 












500,000

Phoenix AZ Airport Goodyear
Airport
‐
Widen
and
strengthen
taxiway
intersec3ons
on
Alpha
to
meet
Group
IV
category
aircrab. 










3,218,000

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Automated
Train
connec3on
to
Terminal
3. 






200,000,000

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Construc3on
of
the
Automated
Train
Guideway. 






166,000,000

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Design,
and
eventually
construct,
Runway
7R/25L
to
Taxiway
Hotel
Connector. 










4,050,000

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
East
Ground
Transporta3on
Center
‐
entry
for
passengers,
commercial
vehicles,
high

occupancy
vehicles
and
buses. 










8,925,000

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Improvements
to
the
Runway
7R/25L
Runway
Safety
Area
and
Object
Free
Area. 








11,585,760

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Phoenix
East
Access
Roadway
Improvements
T4
south. 










5,056,000

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Phoenix
T‐3
Roadway
Lane
Expansion
‐
Construct
an
addi3onal
roadway
lane
north
and

south
of
the
terminal. 








17,000,000

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Phoenix
Terminal
4
Apron
rehabilita3on
and
repairs. 










5,086,200

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Reconstruc3on
and
Modifica3on
of
East
Access
Roads. 








28,392,000

Phoenix AZ Airport Phoenix
Sky
Harbor
‐
Washington
Street
pedestrian
bridge
‐
connects
Light
Rail
sta3on
to
the
Automated
Train.









16,570,000

Phoenix AZ Energy SR85
Solar
Energy
Project 








50,000,000

Phoenix AZ Housing Foothills
Village
(200
apartments)
improvements. 












463,000

Phoenix AZ Housing Frank
Luke,
A.L.
Krohn,
S.P.
Osborn
(753
apartments)
improvements. 










1,267,000

Phoenix AZ Housing Marcos
de
Niza
(374
apartments)
improvements. 












515,000

Phoenix AZ Housing Maryvale
Parkway
Terrace
(108
senior
apartments)
improvements. 












255,000

Phoenix AZ Housing Maryvale
Parkway
Terrace
(108
senior
apartments)
improvements. 












212,000

Phoenix AZ Housing Pine
Towers
(156
senior
apartments)
improvements. 












190,000

Phoenix AZ Housing Scafered
Site
Homes
(433
single
family
homes)
improvements. 










3,600,000

Phoenix AZ Public
Safety Automa3c
Vehicle
Loca3on
(AVL)
System
‐
This
project
would
provide
for
the
acquisi3on
of
the
sobware
in

patrol
vehicles
so
that
they
may
u3lize
GPS. 












500,000

Phoenix AZ Public
Safety Community
Prosecu3on
‐

The
purpose
of
the
project
is
to
develop
two
new
community
prosecu3on
efforts

with
a
target
neighborhood
in
each
of
the
two
new
Phoenix
Police
Department
Precincts. 












773,000

Phoenix AZ Public
Safety Enhanced
Mobile
Data
Security
‐
Funding
would
be
used
to
provide
two‐factor
authen3ca3on
(i.e.
password

and
fingerprint
scan)
and
firewalls
to
mobile
devices
so
that
they
can
securely
access
criminal
jus3ce
data













500,000

Phoenix AZ Public
Safety ePRO
(Electronic
Prosecutor
Records
Organiza3on)
project
which
is
a
phased
module
replacement
project
for

the
exis3ng
case
management
system
and
includes
the
development
of
electronic
processes
to
manage
the

case
work
by
aforneys
and
staff. 












120,000

City State Program Project
Descrip3on Funding
Required Jobs
Phoenix AZ Public
Safety Statewide
Coplink‐
Funding
would
be
used
to
acquire
a
statewide
license
for
Coplink
allowing
all
state
agencies

to
connect
to
one
of
the
four
regional
Coplink
nodes
in
the
state
of
Arizona. 










1,000,000

Phoenix AZ Public
Safety Two‐Finger
Rapid
Subject
Iden3fica3on
Program
‐
Funding
would
be
used
to
acquire
equipment
for
iden3fying

subjects
via
wireless
two‐finger
rapid
iden3fica3on
technology
in
patrol
cars. 










1,000,000

Phoenix AZ Schools Arizona
State
University
Downtown
Phoenix
Campus
City
Center
Hall
‐
A
100,000
square
foot
building
built
to

LEED
standards
will
house
three
60‐seat
classrooms,
three
150‐seat
classrooms,
one
250‐seat
classroom
and

one
400‐seat
classroom 








40,000,000

Phoenix AZ Streets/Roads ADA
Improvement
Program
‐
Barrier 










1,500,000

Phoenix AZ Streets/Roads ADA
Improvement
Program
‐
Major
Construc3on 










1,965,616

Phoenix AZ Streets/Roads Bridge
Rehabilita3on,
Inspec3on
and
Maintenance
Program 








30,315,500

Phoenix AZ Streets/Roads Dust
Control
(PM‐10)
Program 










5,170,621

Phoenix AZ Streets/Roads ITS
Program 








10,751,000

Phoenix AZ Streets/Roads Laveen
Conveyance
Area
Channel 










1,500,000

Phoenix AZ Streets/Roads Light
Emiqng
Diode
(LED)
Traffic
Signal
Conversion 










9,800,000

Phoenix AZ Streets/Roads Major
Collector
and
Residen3al
Overlay
(20
year
cycle) 






106,841,900

Phoenix AZ Streets/Roads Major
Streets
Projects 






107,610,758

Phoenix AZ Streets/Roads North
Interstate‐17
Corridor
Service
Center 








20,000,000

Phoenix AZ Streets/Roads Pedestrian
improvements
at
Central
Avenue
and
the
Salt
River
(in
Regional
Transporta3on
Improvement
Plan) 










3,000,000

Phoenix AZ Streets/Roads Pedestrian/Bike
Safety
Program
Improvements 








13,526,303

Phoenix AZ Streets/Roads Rawhide
Wash
Roadway
Improvements 






100,000,000

Phoenix AZ Streets/Roads Remote
Emergency
Traffic
Center 








20,000,000

Phoenix AZ Streets/Roads Sign
Relec3vity
and
Retrofit
Improvement
Program 








25,000,000

Phoenix AZ Streets/Roads Street
Moderniza3on
and
Sidewalk
Installa3on
Program 








11,157,607

Phoenix AZ Transit Aquire
and
install
a
new
transit
stop
database 












250,000

Phoenix AZ Transit Avoid
planned
suspension
of
all
bus
service
before
5am
and
aber
10pm
beginning
12/29/08 










1,400,000

Phoenix AZ Transit Avoid
reducing
Saturday
bus
service
frequency
beginning
12/29/08. 










1,000,000

Phoenix AZ Transit Bus
Video
Monitoring
System 










3,000,000

Phoenix AZ Transit Regional
Light
Rail
Park‐and‐Ride
Expansion 








60,000,000

Phoenix AZ Transit Regional
Light
Rail
Park‐and‐Ride
Safety
and
System
Enhancements 








20,000,000

Phoenix AZ Transit Regional
Light
Rail
Park‐and‐Ride
Shade
Canopies 








20,000,000

Phoenix AZ Transit Regional
Light
Rail
Park‐and‐Ride
Structure 








30,000,000

Phoenix AZ Transit Transit
Center
renova3ons 










3,500,000

Phoenix AZ Transit Transit
Crossover
Lane
on
State
Route
51 












600,000

Phoenix AZ Water 23rd
Avenue
Wastewater
Treatment
Plant
(two
Phases) 








40,900,000

Phoenix AZ Water 24th
Street
Water
Treatment
Plant
‐
Chlorine
Contact
Basin 










2,000,000

Phoenix AZ Water 27th
Avenue
Transfer
Sta3on
Retrofit 








21,000,000

Phoenix AZ Water Deer
Valley
Water
Treatment
Plant
‐
Process
Op3miza3on,
Ferric
Conversion,
Security 










3,700,000

Phoenix AZ Water Drilling
and
installa3on
of
new
well 










2,100,000

Phoenix AZ Water Fire
Hydrant
Installa3on
(two
projects) 












200,000

Phoenix AZ Water Lib
Sta3on
Security
Upgrades
(seven
projects) 










3,755,000

Phoenix AZ Water Paradise
Valley
Water
System
Upgrade 










5,300,000

Phoenix AZ Water Phoenix
Area
remote
Facili3es 










1,000,000

Phoenix AZ Water Relief
Sewer
Projects
(three
projects) 








51,100,000

Phoenix AZ Water Skunk
Creek
Storm
Water/Drainage 










3,000,000

Phoenix AZ Water SR85
Storm
Water/Drainage 








30,000,000

Phoenix AZ Water Steel
tank
rehab 










2,600,000

Phoenix AZ Water Tres
Rios
Project
with
US
Corp
of
Engineers
‐
Pump
Sta3on,
Over
Bank
Wetlands,
Flow
Regula3ng
Wetlands









59,000,000

Phoenix AZ Water Union
Hills
Water
Treatment
Plant
‐
BAC
Conversion 








12,500,000

Phoenix AZ Water Val
Vista
Water
Treatment
Plant
GAC
conversion 








45,500,000

Phoenix AZ Water Water
Main
Replacements
(six
projects) 








14,600,000

Phoenix AZ Water Water
Main
Replacements
and
Improvements
(six
projects) 








60,600,000

Sahuarita AZ Public
Safety Ford
Crown
Victoria
Patrol
Car
with
equipment
build
out
(X10) 












600,000

Sahuarita AZ Public
Safety Spillman
Mobile
Report
Sobware 












100,000

Sahuarita AZ Public
Safety Spillman
Property/Supply
Sobware 












100,000

Sahuarita AZ Public
Safety Teen/Police
Driving
Track
with
associated
land,
structure
and
equipment 












700,880

Sahuarita AZ Public
Safety Addi3onal
School
Resource
Officer 














60,000
 1
Sahuarita AZ Public
Safety Con3nued
funding
for
School
Resource
Officer 














60,000
 1
Sahuarita AZ Public
Safety Equipment/Fleet
Manager 














60,000
 1
Sahuarita AZ Streets/Roads Nogales
Highway/Old
Nogales
Highway
Traffic
Signal 












550,000
 3
Sahuarita AZ Streets/Roads Two
Sahuarita
Road
Pedestrian
Underpasses 












750,000
 4
Sahuarita AZ Streets/Roads Interim
Traffic
Signals
at
Sahuaria
Road
&
I‐19 












850,000
 5
Sahuarita AZ Streets/Roads Pima
Mine
Road/Rancho
Sahuarita
Railroad
Crossing
and
Traffic
Signal 












850,000
 5
Sahuarita AZ Streets/Roads Santa
Cruz
River
Bridge
Replacement
over
Pima
Mine
Road 










3,000,000
 18
Sahuarita AZ Streets/Roads La
Canada
Drive
Road
Improvements
Phase
III 










9,000,000
 50
Sahuarita AZ Streets/Roads Sahuarita
Road/I‐19
Interchange 








25,000,000
 100
Sahuarita AZ Streets/Roads Sahuarita
Road
Phase
1
&
2:
I‐19
to
Country
Club 








68,000,000
 310
Sahuarita AZ Water Wastewater
Administra3on
Building 










4,000,000
 20
Sahuarita AZ Water Wastewater
Treatment
&
Reclama3on
Facility
3.0
MGD
Expansion 








27,000,000
 110
Scofsdale AZ CDBG South
Scofsdale
Drainage
Improvements‐
Neighborhood
drainage
improvements
to
protect
the
Belleview

Neighborhood
from
100
year
flooding. 












300,000
 5
Scofsdale AZ CDBG Civic
Center
Improvements,
Replace
HVAC
system
for
all
four
Civic
Center
buildings
that
are
housing
CDBG

eligible
community
groups
and
provide
accessibility
improvements. 












475,000
 15
Scofsdale AZ CDBG Black
Hills
Tank
Dam
Removal
‐
Remove
old
and
poten3ally
unsafe
stock
dam
to
mi3gate
possible
downstream

flood
risk 










1,500,000
 23
Scofsdale AZ CDBG Deten3on
Facility
Consolida3on
‐
Remodel
and
expand
the
Civic
Center
Jail. 










3,400,000
 51
City State Program Project
Descrip3on Funding
Required Jobs
Scofsdale AZ CDBG Construc3on
of
new
Solid
Waste
Transfer
Sta3on
‐


Several
proposed
improvements
to
the
exis3ng
facility
will

be
incorporated
into
the
expansion
construc3on
documents
including
new
tunnel
scales,
site
drainage

improvement
and
electrical
upgrades. 










4,336,000
 65
Scofsdale AZ CDBG Construc3on
of
Cactus
Acres
Fire
Sta3on
‐

a
new
11,000
square
foot
fire
sta3on
to
serve
central
Scofsdale

residents. 










6,100,000
 92
Scofsdale AZ CDBG Construc3on
of
Eldorado
Fire
Sta3on
‐
New
11,000
square
feet
fire
sta3on
in
southern
por3on
of
the
City. 










6,325,000
 95
Scofsdale AZ CDBG Construc3on
of
Soleri
Bridge
and
Plaza
over
the
Arizona
Canal;
includes
pedestrian
ameni3es
and
foot
plaza. 










7,450,000
 112
Scofsdale AZ CDBG Upper
Camelback
Wash
Watershed
Flood
Project‐

Reduce
flooding
for
a
major
wash
corridor
north
of
Shea

Boulevard,
this
project
will
remove
approximately
300
structures
from
the
100
year
flood
plain.











8,500,000
 128
Scofsdale AZ CDBG Troon
North
Park
and
Dam
Construc3on
‐
Construct
a
park
on
exis3ng
34‐acre
site
with
turfed
areas,
ramadas,

sports
courts,
and
playground.
Bring
an
earthen
dam
into
full
compliance
with
regulatory
requirements
and

provide
regional
flood
protec3on. 










9,000,000
 135
Scofsdale AZ CDBG Renova3on
of
the
Scofsdale
Center
for
the
Performing
Arts;
including
construc3on
of
the
mezzanine.











9,500,000
 143
Scofsdale AZ CDBG ADA
Improvements;
City
public
facili3es
ADA
accessibility
improvements. 










8,422,000
 156
Scofsdale AZ CDBG Reloca3on
of
historic
Stagebrush
Theater
and
construc3on
of
adjoining
10,000sf
performing
arts
facility. 










5,000,000
 180
Scofsdale AZ CDBG Construc3on
of
parking
facility
for
the
SkySong
Innova3on
Center.

1000
car
parking
garage
to
support
the

development
of
300,000
sq.
b.
office
and
retail
space. 








16,500,000
 245
Scofsdale AZ CDBG Construc3on
of
the
Scofdale
Museum
of
the
West;
a
45,000
sq.
b.
facility
to
provide
historical
exhibits
and

educa3onal
facili3es. 








35,000,000
 585
Scofsdale AZ Energy City
Solar
Conversion
‐
Construc3on
and
installa3on
of

photovoltaic
systems
on
city
owned
facili3es
for

combined
energy
output
of
2.5
megawafs
of
solar
energy. 








12,000,000
 180
Scofsdale AZ Streets/Roads Road
Construc3on
Project,
Mountain
View
Rd.
and
124th
St.,
1.1
miles,
Traffic
calming
and
rural
sidewalks













250,000
 4
Scofsdale AZ Streets/Roads Transporta3on
Construc3on
Project,
Villa
Monterey
Neighborhood
Sidewalk
Ramps,
Install
sidewalk
ramps

throughout
neighborhood 












250,000
 4
Scofsdale AZ Streets/Roads Transporta3on
Construc3on
Project,
0.4
miles,
McDowell
Mountain
Ranch
Mul3‐use
Path
extension,
10'
path

connec3ng
to
library,
aqua3c
center,
park
and
school 












450,000
 7
Scofsdale AZ Streets/Roads Traffic
Management
System
Upgrades,
Accelerate
installa3on
of
new
signal
system
communica3ons
equipment

to
facilitate
intelligent
transporta3on
system
capabilites 










1,500,000
 23
Scofsdale AZ Streets/Roads Transporta3on
Construc3on
Project,
0.75
miles,
Cross
Cut
Canal
‐
Thomas
Rd.
to
Indian
School
Rd.,
New
mul3‐
use
path
and
pedestrian/bicycle
bridge 










1,620,000
 24
Scofsdale AZ Streets/Roads Transporta3on
Construc3on
Project,
0.5
miles,
Indian
Bend
Wash
‐
Jackrabbit
Rd.
to
Chaparral
Rd.,
New
mul3‐
use
path
and
pedestrian/bicycle
bridge 










1,640,000
 25
Scofsdale AZ Streets/Roads Indian
Bend
Wash
Mul3‐use
Path,

1.0
miles
‐
Pavement
replacement/widening
and
irriga3on
reloca3on
in
high‐
use
area 










1,800,000
 27
Scofsdale AZ Streets/Roads Construc3on
of
Union
Hills
Drive
Bridge,
Add
2‐lane
bridge
over
Reata
Pass
wash
to
eliminate
traffic

constric3on
on
4‐lane
road 










2,750,000
 41
Scofsdale AZ Streets/Roads Hayden
Road/Camelback
Road
Intersec3on
Improvements,
Add
turn
lanes
and
pedestrian
underpass 










2,800,000
 42
Scofsdale AZ Streets/Roads Pima
Road
Intersec3on
Improvements,
Add
new
turn
lanes
and
access
management
at
Thomas
Rd.,
Chaparral

Rd.,
and
Indian
Bend
Rd.
along
Salt
River
Pima‐Maricopa
Indina
Community 










3,200,000
 48
Scofsdale AZ Streets/Roads Road
Construc3on
Project,
Chaparral
Road
‐
68th
St.
to
Scofsdale
Rd.
0.5
miles,
Traffic
calming,
sidewalks,

streetscape,
sewer
line 










3,400,000
 51
Scofsdale AZ Streets/Roads Frank
Lloyd
Wright/Pima
Freeway
Intersec3on
Improvements,
Adjust
lane
striping,
signage
and
add
turn
lanes 










3,500,000
 53
Scofsdale AZ Streets/Roads Construc3on
of
Thomspson
Peak
Parkway
Bridge,
Add
2‐lane
bridge
over
Reata
Pass
wash
to
eliminate
traffic

constric3on
on
4‐lane
road 










3,850,000
 58
Scofsdale AZ Streets/Roads Road
Construc3on
Project,
0.75
miles,
Indian
School
Road
‐
Drinkwater
Blvd.
to
Hayden
Rd.,
New
turn
lanes,

pavement
reconstruc3on,
bike
lanes,
widened
sidwalks,
drainage 










6,200,000
 93
Scofsdale AZ Streets/Roads Road
Construc3on
Project,
0.75
miles,
Scofsdale
Road
‐
Pima
Freeway
to
Thompson
Peak,
5‐6
travel
lanes,

mul3‐use
path,
mul3‐use
trail,
raised
medians,
flood
control
protec3on 










7,000,000
 105
Scofsdale AZ Streets/Roads Transporta3on
Construc3on
Project,
1.75
miles,
Scofsdale
Road
Streetscape
‐
Roosevelt
St.
to
Earll
Dr.

Bike

lanes,
widened
sidewalks,
raised
medians,
streetscape 










7,000,000
 105
Scofsdale AZ Streets/Roads Road
Construc3on
Project,
1.75
miles,
Pinnacle
Peak
Rd.
‐
Miller
Rd.
to
Pima
Rd.Widen
from
2
to
4
travel
lanes,

turn
lanes,
bike
lanes,
sidewalks,
mul3‐use
trail,
raised
medians,
flood
control
protec3on 








21,500,000
 323
Scofsdale AZ Streets/Roads Road
Construc3on
Project,
1.5
miles,
Pima
Rd.
‐
Thompson
Peak
Parkway
to
Pinnacle
Peak
Rd.Widen
from
4
to

6
travel
lanes,
turn
lanes,
bike
lanes,
mul3‐use
path,
mul3‐use
trail,
raised
medians,
flood
control
protec3on 








23,400,000
 351
Scofsdale AZ Streets/Roads Road
Construc3on
Project,
1.5
miles,
Scofsdale
Road
‐
Thompson
Peak
to
Pinnacle
Peak,
Widen
from
4
to
6

travel
lanes,
turn
lanes,
bike
lanes,
mul3‐use
path,
mul3‐use
trail,
raised
medians,
new
bridge
and
flood
control

protec3on 








26,250,000
 394
Scofsdale AZ Transit Bus
Stop
Improvements,
Install
15
new
bus
shelters
and
100
new
solar
lighted
poles 












325,000
 5
Scofsdale AZ Water Gainey
Wastewater
Treatment
Plant
Rehabilita3on


(Rehabilita3on/Replacement
of
aging
infrastructure) 










6,000,000
 78
Scofsdale AZ Water Southern
Neighborhoods
Water
Quality
Improvement

(Addi3on
of
membrane
treatment
to
the
exis3ng
water

treatment
facility) 








12,000,000
 156
Scofsdale AZ Water Water
Campus
Chlorine
Genera3on

(Replacement
of
gaseous
chlorine
system
at
Water
Campus
WTP
and
WRP

with
sodium
hypochlorite
chlorine
genera3on
system) 








12,000,000
 156
Scofsdale AZ Water Water
distribu3on
and
sewer
collec3on
system
improvements
(Rehabilita3on/Replacement
of
aging

infrastructure
and
increasing
the
system's
capacity
to
ensure
adequate
service
and
prevent
sewer
overflows)









30,000,000
 390
Scofsdale AZ Water Advanced
Water
Treatment
Plant
Expansion


(Expansion
of
membrane
treatment
following
water
reclama3on

facility
for
recharge
efforts
to
help
ensure
long‐term
groundwater
availability
and
quality)
–
this
could
not
be

completed
before
the
end
of
2010.









60,000,000
 780
South
Tucson AZ CDBG Replacement
of
City
Fleet 










1,500,000
 2
South
Tucson AZ CDBG Replacement
of
Garbage
Containers 












500,000
 2
South
Tucson AZ CDBG Replacement
of
Garbage
Trucks 












250,000
 3
South
Tucson AZ CDBG Security
Camera
Installa3on
on
all
Public
Facili3es 












125,000
 3
South
Tucson AZ CDBG ADA
Compliance
rehab
of
Public
Facili3es 












500,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
South
Tucson AZ CDBG Citywide
Irriga3on
System
Improvements 












250,000
 5
South
Tucson AZ CDBG Economic
Development
Land
Acquisi3on 








10,000,000
 5
South
Tucson AZ CDBG Graffi3
Abatement 












250,000
 5
South
Tucson AZ CDBG Lead
Base
Paint
Abatement 












250,000
 5
South
Tucson AZ CDBG Public
Service
Employees
Staff
Shortages,
Various
Department 












150,000
 6
South
Tucson AZ CDBG Facade
Renova3on
Program
for
Business
Districts 










1,000,000
 10
South
Tucson AZ CDBG Weatheriza3on
and
Energy
efficiency
rehab 












100,000
 10
South
Tucson AZ CDBG Citywide
Street
Ligh3ng 










1,500,000
 12
South
Tucson AZ CDBG Land
Bank
for
Affordable
Housing 










2,500,000
 12
South
Tucson AZ CDBG Citywide
Sidewalk
Improvements 










1,750,000
 22
South
Tucson AZ CDBG Emergency
Home
Repair
and
Home
replacement
program
for
occupied
eligible
households 








10,000,000
 120
South
Tucson AZ CDBG Brownfields
Redevelopment 








25,000,000
 180
South
Tucson AZ Energy Electric
Powered
Vehicles
‐
Traffic
Control 














25,000
 2
South
Tucson AZ Housing 172
Unit
Housing
Authority
Rehabilita3on 










1,850,000
 10
South
Tucson AZ Public
Safety Add
GITEM
Police
Officer 














32,500
 1
South
Tucson AZ Public
Safety City
Magistrate
Court
Security 














50,000
 1
South
Tucson AZ Public
Safety Recruit
Addi3onal
Police
Officers
and
Firefighters 












150,000
 6
South
Tucson AZ Public
Safety Fill
Vacant
Posi3ons
‐
Police
and
Fire
Departments 












300,000
 8
South
Tucson AZ Public
Safety Reten3on
Program
for
Police,
Fire
and
Support
Posi3ons 












250,000
 22
South
Tucson AZ Streets/Roads Recruit
Addi3onal
Public
Works
Employees 












100,000
 6
South
Tucson AZ Streets/Roads Citywide
Rehab
of
speed
humps 














50,000
 8
South
Tucson AZ Streets/Roads 26th
Street/5th
Avenue
Drainage
Project
#2 












400,000
 15
South
Tucson AZ Streets/Roads 26th
Street/8th
Avenue
Drainage
Project
#4 












925,000
 15
South
Tucson AZ Streets/Roads 32nd
Street/2nd
Avenue
Drainage
Project
#5 










1,250,000
 15
South
Tucson AZ Streets/Roads 40th
Street/4th
Avenue
Drainage
Project
#1 










1,750,000
 15
South
Tucson AZ Streets/Roads 7th
Avenue/29th
Street
Drainage
Project
#3 










1,350,000
 15
South
Tucson AZ Streets/Roads El
Paso/SW
Greenway
Trails
System
Improvements 










2,000,000
 25
St.
Johns AZ Airport Airport
Hangers 












400,000
 40
St.
Johns AZ Airport Airport
Improvement
Project
‐
Runway
Extension,
Taxiway
Reconstruc3on,
Ramp
Rehabili3on 










3,000,000
 300
St.
Johns AZ Streets/Roads 4th
West
Bridge
replacement 












150,000
 15
St.
Johns AZ Streets/Roads 7th
South
sidewalk
extension 












250,000
 25
St.
Johns AZ Streets/Roads Vista
San
Juan
Roadway
Improvements 












350,000
 35
St.
Johns AZ Streets/Roads 1st
West
sidewalk
improvements
project 












360,000
 36
St.
Johns AZ Water City
wide
fire
hydrants
expansion
project. 












125,000
 13
St.
Johns AZ Water 4th
N.
water
distribu3on
line
extension 












200,000
 20
St.
Johns AZ Water Lifle
Reservoir
water
distribu3on
line
extension 












300,000
 30
St.
Johns AZ Water West
Bench
Sewer
line
extension 












380,000
 38
St.
Johns AZ Water Water
Quality
‐
Water
transmission
pipeline
and
new
well.
Per
facility
planning
study. 










5,800,000
 580
Tombstone AZ Airport Add
runway
and
purchase
addi3onal
land. 












650,000
 10
Tombstone AZ CDBG Rehab
of
Old
City
Hall
as
a
tourist
afrac3on 












750,000
 20
Tombstone AZ CDBG Contruc3on
of
new
Municipla
Complex 










1,000,000
 25
Tombstone AZ Public
Safety Four
full
3me
paid
Firefighter/EMT 












160,000
 4
Tombstone AZ Public
Safety Reten3on
Program
for
Public
Safety
Employees 












250,000
 15
Tombstone AZ Public
Safety Add
to
exis3ng
fire
sta3on
addi3onal
parking
bays
and
a
class
room.
 












750,000
 25
Tombstone AZ Public
Safety Build
new
police
sta3on. 










1,000,000
 25
Tombstone AZ Streets/Roads Resurface
exis3ng
streets
with
a
chip
seal
and
construct
drainage
and
resurface
streets
that
were
improperly

engineered
years
ago.
Install
drainage
culverts
in
dry
washs
that
have
a
poten3al
for
flooding.
 












650,000
 10
Tombstone AZ Water Drill
addi3onal
water
well 










1,000,000

Tombstone AZ Water Upgrade
catch
basin
and
security
for
springs
located
at
the
Huachuca
Mountains 












500,000

Tombstone AZ Water Install
5,000
linier
feet
of
8
inch
main
water
line
which
would
include
the
replacement
of
old
failing
water
lines

and
installa3on
of
new
services.
This
project
would
include
all
necessary
valves
and
24
fire
hydrants 












450,000
 10
Tombstone AZ Water Upgrade
wastewater
plant
by
adding
an
addi3onal
digester
and
drying
beds 










1,000,000
 50
Tombstone AZ Water Add
a
one
million
gallons
water
reservoir. 










2,000,000
 100
Tucson AZ CDBG Construc3on
of
addi3onal
park
facili3es 








20,000,000

Tucson AZ CDBG Construc3on
of
addi3onal
transi3onal
housing 










2,000,000

Tucson AZ CDBG Construc3on
of
public
housing
at
Depot
Plaza 










2,500,000

Tucson AZ CDBG Museums
District
Parking
&
Cultural
Plaza 








18,000,000

Tucson AZ CDBG Solar
retrofit
of
public
housing 










4,000,000

Tucson AZ CDBG Solar
retrofits
of
publicly
owned
buildings 










4,000,000

Tucson AZ CDBG Urban
Parks
(Downtown
Area
Greenways) 








20,000,000

Tucson AZ CDBG Weatheriza3on
and
energy
efficiency
housing
rehabilita3on 










5,000,000

Tucson AZ CDBG Civic
Center
Improvements,
Parking
Garage
&
Plaza 








45,000,000
 750
Tucson AZ Energy Energy
Efficient
Downtown
Central
Energy
Plant 








45,000,000

Tucson AZ Housing Public
Housing
Upgrades
and
Improvements
(including
security
ligh3ng) 










7,000,000

Tucson AZ Public
Safety Fire
Department
opera3onal
support
facility
to
house
support
and
speciality
vehicles,
add
beds
and
store

homeland
security
equipment
and
supplies 










2,000,000

Tucson AZ Public
Safety Public
Safety
Communica3ons
Facility
Electrical
Power
capacity
improvement
to
enhance
network
and
power

system. 














45,000

Tucson AZ Public
Safety Public
Safety
Communica3ons
Network
infrastructure
improvements
for
fiber‐op3c
network 












100,000

Tucson AZ Streets/Roads I‐10
Frontage
Road
Streetscape
Improvements 








34,000,000

Tucson AZ Streets/Roads Intelligent
Transporta3on
System
improvements
and
equipment 








30,000,000

Tucson AZ Streets/Roads Miracle
Mile
Improvements 










6,000,000

Tucson AZ Streets/Roads Mulitmodal
Streetscape
Improvements
to
Major
Arterials 








25,000,000

Tucson AZ Streets/Roads Pavement
rehabilita3on
and
preserva3on
and
water
u3lity
reloca3on 








45,000,000

Tucson AZ Streets/Roads Camino
Seco
roadway
construc3on 










8,000,000
 280
Tucson AZ Streets/Roads Houghton
Road
Railroad
Crossing
and
Bridge 








10,000,000
 350
Tucson AZ Streets/Roads Santa
Cruz
River
Bridge 








12,000,000
 420
Tucson AZ Streets/Roads Cushing
Street
Bridge 








16,000,000
 560
City State Program Project
Descrip3on Funding
Required Jobs
Tucson AZ Transit 72
Alterna3ve
Fuel
Buses 








30,000,000

Tucson AZ Transit Build
out
of
bus
maintenance
and
storage
facility
to
expand
from
150
to
250
buses. 








30,000,000

Tucson AZ Transit Intermodal
Intercity
bus
terminal
and
transit/transporta3on
office 








30,000,000

Tucson AZ Transit Tucson
Modern
Streetcar
for
construc3on
to
complete
the
project 








75,000,000
 2600
Tucson AZ Water CAVSARP
booster
expansion 










2,600,000

Yuma AZ CDBG Joe
Henry
Park
Restroom
Replacement 












380,000
 35
Yuma AZ CDBG Pinto
Lane
Sanitary
Sewer
Lib
Sta3on 










2,200,000
 35
Yuma AZ CDBG 1st
Avenue
roadway
and
u3lity
improvements 










6,200,000
 45
Yuma AZ CDBG Municipal
Service
Center
Complex 








24,000,000
 250
Yuma AZ Public
Safety Public
Safety
Training
Facility 










7,240,000
 65
Yuma AZ Public
Safety Fire
Sta3on
No.
1/EMOPS
Center 










4,500,000
 150
Yuma AZ Streets/Roads 24th
Street
and
22nd
Drive
(Traffic
Signal
installa3on,
turn
lane
expansion,
and
roadway
modifica3ons)













540,000
 25
Yuma AZ Streets/Roads 8th
Street
and
14th
Avenue 












400,000
 25
Yuma AZ Streets/Roads Avenue
3E
MCAS
Guard
Rail 












320,000
 25
Yuma AZ Streets/Roads Speese
Addi3on
Roadway 












330,000
 25
Yuma AZ Streets/Roads 12‐16th
Street/4th
Avenue‐Avenue
A 










4,600,000
 40
Yuma AZ Streets/Roads Casa
Manana 










1,650,000
 40
Yuma AZ Streets/Roads Avenue
3.5E
construc3on 








16,000,000
 46
Yuma AZ Streets/Roads 16th
Street
improvements 








19,300,000
 61
Yuma AZ Streets/Roads 32nd
Street
Widening
3E
to
5E 










9,300,000
 75
Yuma AZ Streets/Roads Arizona
Welcome
Center 










4,000,000
 150
Yuma AZ Water MSWTP
Filter
Tank
Upgrades 










9,200,000
 20
Yuma AZ Water Floccula3on/Sediment
Basins
Rehab
(3&4) 












380,000
 25
Yuma AZ Water MSWTP
Chlorine
Scrubber
Improvements 












560,000
 25
Yuma AZ Water 40th
Street
Phase
2
Water
Transmission
Lline
I‐8
to
40th
Street 










4,700,000
 35
Yuma AZ Water 5th
Avenue
Watermain
8th
to
16th
Street 










3,100,000
 35
Yuma AZ Water Water
U3lity
Security 












880,000
 35
Yuma AZ Water 24th
Street
Water
Storage
Tanks
and
High‐Speed
Booster
Pump
Sta3on 








13,800,000
 42
Yuma AZ Water Figuro
Digesters 










8,600,000
 45
Yuma AZ Water Avenue
A‐16th
to
24th
Storm
Drain
Replacement 










8,000,000
 65
Alameda CA CDBG Rehabilitate
the
skate
board
park. 












100,000
 2
Alameda CA CDBG Resurfacing
basketball
courts
in
Longfellow
Park
(located
in
low
income
census
tract). 












125,000
 3
Alameda CA CDBG Resurfacing
tennis
court
in
Longfellow
Park
(located
in
low
income
census
tract).
 












125,000
 3
Alameda CA CDBG Upgrade
building
interior
and
refinish
360,000
sq.
b.
of
gynmasium
floor
at
Alameda
Point
Gym
(located
in
low

income
census
tract). 












200,000
 4
Alameda CA CDBG ADA
upgrades
to
restroom
facility
at
Encincal
Boat
ramp. 












250,000
 6
Alameda CA CDBG ADA
upgrades
to
restroom
facility
at
Grand
Street
Boat
ramp. 












250,000
 6
Alameda CA CDBG Replace
windows
and
trim
at
City
Hall. 












250,000
 6
Alameda CA CDBG Replace
windows
and
trim
at
the
Veterans
Memorial
Building. 












250,000
 6
Alameda CA CDBG ADA
upgrade
of
restroom
facility
and
lobby
at
Alameda
Point
Gymnasium
(located
in
low
income
census
tract).













300,000
 7
Alameda CA CDBG Replace
the
fence
at
Washington
Park
field. 












300,000
 7
Alameda CA CDBG Resurface
basketball
courts
at
Washington,
Leydecker,
and
McKinley
parks. 












375,000
 8
Alameda CA CDBG Resurface
tennis
courts
at
Washington,
Leydecker,
and
McKinley
parks. 












375,000
 8
Alameda CA CDBG Upgrade
the
pathways,
ligh3ng,
and
landscaping
at
Neptune
Park. 












350,000
 8
Alameda CA CDBG Fire
Sta3on
5
Rehabilita3on
(located
in
low
income
census
tract):
roof
and
windows
replacement
and
walls. 










1,000,000
 11
Alameda CA CDBG Rehabilitate
field
‐
Lincoln
Park. 












500,000
 11
Alameda CA CDBG Replace
the
fence
at
Lincoln
Park
field. 












500,000
 11
Alameda CA CDBG Upgrade
and
rehabilitate
building
interior,
including
asbestos
removal,
pain3ng,
replacement
of
carpets
and

window
coverings,
and
ceiling
repairs
at
the
Al
DeWif
O'
Club
at
Alameda
Point
(located
in
low
income
census

tract). 












500,000
 11
Alameda CA CDBG ADA
park
pathway
upgrades 










2,500,000
 25
Alameda CA CDBG Alameda
Landing
Phase
I:
Demoli3on

of
exis3ng
improvements,
reloca3on
of
u3lites,
and
environmental

remedia3on
of
future
residen3al
site
(subject
to
CDBG
blight
and
brown
field
regula3ons). 










4,750,000
 50
Alameda CA CDBG Restore
the
historic
Carnegie
Free
Library
for
public
use
as
the
Community
Arts/Planning
and
Building
Center.


Relocate
the
adjacent
Foster
House
to
accommodate
a
proposed
addi3on
that
will
connect
the
Foster
House

with
the
Carnegie
Library
and
provide
d 










5,630,000
 50
Alameda CA Energy Install
solar
hot
water
hea3ng
system
to
supplement
the
opera3on
of
a
new
energy
efficient
hot
water
system

at
Anne
B.
Diament. 












100,000
 2
Alameda CA Energy Install
solar
panels
on
roof
of
the
Main
Library. 










1,200,000
 13
Alameda CA Housing Replace
the
boiler
system,
at
Anne
B.
Diament,
with
a
high‐efficiency
boiler
for
hydroponic
hea3ng
system. 












125,000
 2
Alameda CA Housing Repaint
all
exterior
siding
and
trim;
restain
fences
and
gates
at
Eagle
Village. 












200,000
 4
Alameda CA Housing Repair
all
exterior
siding
and
trim,
and
restain
fences
and
gates
at
Parrot
Village. 












200,000
 4
Alameda CA Housing Replace
the
first
floor
kitchen
and
bath
cabinets,
including
the
community
room
at
Anne
B.
Diament. 












200,000
 4
Alameda CA Housing Construct
a
new
22‐space
parking
lot
at
the
rear
of
the
Independence
Plaza
complex. 












200,000
 5
Alameda CA Housing Replace
asphalt
parking
lots
(7
total)
and
driveways
at
Esperanza. 












350,000
 8
Alameda CA Housing Repaint
the
interior
of
all
Housing
Authority
units. 










1,000,000
 10
Alameda CA Housing Replace
kitchen
and
bath
cabinets,
counters,
and
electrical
sub
panels
at
Esperanza. 










1,000,000
 10
Alameda CA Housing Replace
roofs
and
gufers
on
all
buildings
at
Esperanza. 












725,000
 10
Alameda CA Housing Replace,
at
Independence
Plaza,

two
ponds,
remove
lawn,
and
re‐landscape
with
drought
tolerant
na3ve

plants. 












500,000
 10
Alameda CA Housing Replace
kitchen,
bath
cabinets
and
counters
in
all
the
186
units
of
the
Independence
Plaza. 










1,320,000
 12
Alameda CA Housing Replace
the
interior
flooring
of
all
the
Housing
Authority
units. 










1,200,000
 12
Alameda CA Housing Replace
siding,
windows,
and
sliding
glass
doors
with
energy
efficient
glazing
in
all
units
at
Anne
B.
Diament. 










1,300,000
 13
Alameda CA Streets/Roads Park
Street
Streetscape
improvements,
including
vintage
ligh3ng
and
street
trees,
from
Lincoln
Avenue
to

Times
Way
and
Webb
Street;
and
Central
Avenue
to
San
Jose
Avenue. 












200,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
Alameda CA Streets/Roads Plant
approximately
500
new
trees
and
remove
and
replace
approximately
150
trees
throughout
the
City. 












300,000
 7
Alameda CA Streets/Roads ADA
construc3on
improvements
to
100
intersec3ons;
add
truncated
domes
and
ramps. 












500,000
 8
Alameda CA Streets/Roads Install
curb
bulb‐outs
at
Grand
Street
and
San
Jose
Avenue;
install
pedestrian
curb
ramps
in
front
of
Lum

School;
install
lighted
mid‐block
cross
on
Grand
Street;
improve
three
public
walkways;
update
crossing
signs. 












750,000
 10
Alameda CA Streets/Roads ADA
sidewalk
rehabilita3on. 










3,750,000
 11
Alameda CA Streets/Roads Reconstruct
and
enhance
bicycle
trails. 












500,000
 11
Alameda CA Streets/Roads Improve
drainage
and
resurface
street,
Mariner
Square
Drive. 










1,250,000
 14
Alameda CA Streets/Roads Install
accessible
signals
and
pedestrian
countdown
signals
at
58
intersec3ons. 










1,235,000
 14
Alameda CA Streets/Roads Install
traffic
signals
at
three
loca3ons. 










1,250,000
 14
Alameda CA Streets/Roads Install
8,500
linear
feet
of
new
sidewalks
to
fill
in
gaps
in
pedestrian
corridors. 










1,000,000
 17
Alameda CA Streets/Roads Construct
Phase
2
of
the
Webster
Street
Streetscape
project,
including
vintage
ligh3ng
and
street
trees. 










3,000,000
 20
Alameda CA Streets/Roads Reconstruct
approximately
1
mile
of
Central
Avenue,
including
drainage
and
sidewalk
improvements. 










1,880,000
 21
Alameda CA Streets/Roads Reconstruct
.35
miles
of
Fernside
Boulevard,
including
drainage
and
sidewalk
improvements. 










2,011,000
 22
Alameda CA Streets/Roads Reconstruct
approximately
1.5
miles
of
a
major
collector
in
Harbor
Bay
Business
Park. 










5,000,000
 28
Alameda CA Streets/Roads Provide
funding
match
to
construct
a
segment
of
a
new
arterial
connec3ng
State
Route
51. 










9,000,000
 60
Alameda CA Transit Install
bus
shelters
and
related
improvements
at
18
loca3ons
throughout
the
City. 












250,000
 6
Alameda CA Water Install
mechanical
trash
racks
to
clear
debris
and
reduce
flooding
at
various
storm
pump
sta3ons. 












750,000
 10
Alameda CA Water Use
shotcrete
to
improve
the
structural
stability
of
the
Southshore
Lagoon
seawalls
adjacent
to
City
public

access:
approximately
3,000
linear
feet. 










1,700,000
 19
Alameda CA Water Replace
riprap
and
improve
ouzalls
for
the
Harbor
Bay
Dike
and
seawall
to
protect
public
access
and
adjacent

residences. 










5,000,000
 30
Alhambra CA CDBG Alley
Improvements
in
CDBG
Areas 












250,000

Alhambra CA CDBG Street
Light
Conversion
to
Mul3ple
Light
Circuits
in
the
Airport
Tract
area,
south
of
Valley
Blvd.
and
west
of

New
Avenue 












700,000

Alhambra CA CDBG Street
Rehabilita3on/Construc3on:
Commonwealth
Avenue,
from
Granada

Avenue
to
Winchester
Avenue 










2,688,307

Alhambra CA CDBG Street
Rehabilita3on/Construc3on:
Main
Street,
from
the
east
City
boundary
to
the
west
City
boundary 










8,000,000

Alhambra CA CDBG Street
Rehabilita3on/Construc3on:
Raymond
Avenue,
from
Grand
Avenue
to
Mission
Road 












900,000

Alhambra CA Energy LED
Traffic
Signal
Lights
‐
75
loca3ons:
Change
from
incandescent
bulbs
to
low
emiqng
diodes
(LED)
for

decreased
electrical
costs. 










1,000,000

Alhambra CA Public
Safety Construc3on
of
an
Alternate
Emergency
Opera3ons
Center
(EOC)/Classroom 












325,000

Alhambra CA Public
Safety Purchase
and

Installa3on
of
Digital
In‐Car
Video
Cameras
for
Police
patrol
vehicles:
includes
all
network

hardware,
sobware,

and
servers
to
wirelessly
download
video
from
patrol

vehicles

onto
servers.
Will
assist

in

compiling
evidence

in
DUI
and
p 












175,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Alhambra
Road,

from
the

east
City
boundary
to
the
west
City
boundary 










1,000,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Chapel
Avenue,
from
Woodward
Avenue
to
Hellman
Avenue 










2,000,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Concord
Avenue,
from
Fremont
Avenue
to
the
west
City
boundary 










1,000,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Garvey
Avenue,
from
Ramona
Road
to
Atlan3c
Blvd. 










1,500,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Glendon
Way,
from
New
Avenue
to
Meridian
Avenue 










1,603,678

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Hellman
Avenue,

from
the
east
City
boundary
to
Almansor
Street 












250,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Marengo
Avenue,
from
Alhambra
Road
to
Ross
Avenue 










2,120,150

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Mission
Road,

from
Garfield
Avenue
to
the
west
City
boundary 










2,402,082

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
New
Avenue,
from
Los
Higos/north
boundary
to
the

I‐10
Freeway 










1,000,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Palm
Avenue,
from
Main
Street
to
Mission
Road 










1,500,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Poplar
Avenue,
from
Fremont
Avenue
to
the
west
City
boundary 










1,000,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Valley
Blvd.,

from
the
east
City
boundary
to
Marengo
Avenue 










1,500,000

Alhambra CA Streets/Roads Street
Rehabilita3on/Construc3on:
Woodward
Avenue,
from
Bushnell
Avenue
to
Almansor
Avenue 












900,000

Alhambra CA Water Garvey
Reservoir
Improvements
‐
Epoxy
Lining 










1,500,000

Alhambra CA Water Longden
Well

and
Pumphouse
Rehabilita3on 










2,000,000

Alhambra CA Water Sewer
Mainline
Replacement
Project:
334
linear
feet
on
Hellman
Avenue,
east
of
Garfield
Avenue 












135,270

Alhambra CA Water Water
Main
Replacement
Project:
On
Avondale,
from
Hellman
to
Ramona 












250,000

Alhambra CA Water Water
Main
Replacement
Project:
On
La
Paloma,
from
Hellman
to
Ramona 












200,000

Alhambra CA Water Water
Main
Replacement
Project:
On
Meridian
(south),
from
Hellman
to
Ramona 












250,000

Alhambra CA Water Water
Main
Replacement
Project:
On
Orange
Grove
Avenue,
from
Hellman
to
Ramona 












300,000

Alhambra CA Water Water
Main
Replacement
Project:
On
Pala3ne
Avenue,
from
Waverly
to
Vista 










1,000,000

Alhambra CA Water Water
Main
Replacement
Project:
On
Warwick,
from
Hellman
to
Ramona 












500,000

Alhambra CA Water Water
Main
Replacement
Project:
On
Westminster
Avenue,
from
Hellman
to
Ramona 












300,000

Alhambra CA Water Water
Main
Replacement
Project:
On
Winthrop
Drive,
from
Hellman
to
Ramona 












350,000

Alhambra CA Water Water
Main
Replacement
Project:
Westmont
Drive,
from
Hellman
to
Ramona 












350,000

Anaheim CA CDBG Construc3on
of
Fire
Sta3on
No.
12
and
Neighborhood
Park

‐
Pla3num
Triangle 








14,000,000
 406
Anaheim CA CDBG Electrical
System
Undergrounding 








18,000,000
 522
Anaheim CA CDBG Anaheim
Conven3on
Center
Expansion
Project 






220,000,000
 6000
Anaheim CA Energy Hydroelectric
Turbine
at
Walnut
Canyon 










1,000,000
 29
Anaheim CA Energy Anaheim
Conven3on
Center
‐
Water
and
Energy
Efficiency
and
Solar
Power
Retrofiqng
Project 








10,000,000
 290
Anaheim CA Energy Water
and
Energy
Efficiency
Retrofiqng
Projects 








18,750,000
 522
Anaheim CA Energy Anaheim
Solar
Flair
(Solar
Panel
placement
on
city
facili3es
and
commercial
sites) 








24,000,000
 690
Anaheim CA Streets/Roads Intersec3on
Widening
Projects
‐
La
Palma
Ave
and
Kraemer
Blvd;
East
Street
and
91
Freeway 










3,000,000
 290
Anaheim CA Streets/Roads Katella
Ave
Smart
Street
Roadway
Construc3on
Project 








15,000,000
 580
Anaheim CA Streets/Roads Roadway
and
Highway
Infrastructure
Reconstruc3on 








35,000,000
 1450
Anaheim CA Streets/Roads Gene
Autry
Way
and
Interstate
5
Interchange
Construc3on
Project 








32,000,000
 1740
Anaheim CA Water Thornton
Brady
Storm
Drain
Construc3on 










3,000,000
 87
Anaheim CA Water Downtown
Water
Recycling
Project
 










5,000,000
 145
Anaheim CA Water Downtown
Sewer
Reconstruc3on
Project 








20,000,000
 1160
Anaheim CA Water Water
System
Infrastructure
Construc3on
Program 








28,000,000
 1537
Apple
Valley CA Streets/Roads Dale
Evans
Parkway
rehabilita3on,
from
Johnson
Road
to
Interstate
15 










3,000,000
 150
Apple
Valley CA Streets/Roads Dale
Evans
Parkway
rehabilita3on,
widening
and
bike
lanes,
from
Otoe
Road
to
Waalew
Road 










3,000,000
 150
City State Program Project
Descrip3on Funding
Required Jobs
Apple
Valley CA Streets/Roads Kiowa
Road
rehabilita3on,
widening
and
bike
lanes,
from
Bear
Valley
Road
to
Tussing
Ranch
Road 










2,500,000
 150
Apple
Valley CA Streets/Roads Mojave
River
Bridge
(Bear
Valley
Road)
structural
analysis
and
rehabilita3on 










2,000,000
 150
Apple
Valley CA Streets/Roads Navajo
Road
rehabilita3on,
widening
and
bike
lanes,
from
Bear
Valley
Road
to
Tussing
Ranch
Road. 










2,500,000
 150
Apple
Valley CA Streets/Roads Navajo
Road
rehabilita3on,
widening
and
bike
lanes,
from
State
Route
18
to
Waalew
Road. 










3,000,000
 150
Apple
Valley CA Streets/Roads Waalew
Road
rehabilita3on,
widening
and
bike
lanes,
from
Corwin
Road
to
Navajo
Road 










2,500,000
 150
Apple
Valley CA Streets/Roads The
Yucca
Loma
Bridge/Road
Project
will
provide
a
new
bridge
crossing
over
the
Mojave
River,
and
will

ul3mately
connect
to
I‐15
at
the
proposed
La
Mesa/Nisqually
Interchange
in
Victorville.

It
will
create
a
new

east/west
corridor
in
the
Victor
Valley 








40,000,000
 1750
Apple
Valley CA Water Wastewater
Treatment
Facility
‐
2
MGD 








18,000,000
 2500
Apple
Valley CA Water Water
Infrastructure
and
Reservoir
in
North
Apple
Valley 








15,000,000
 2500
Bell CA Streets/Roads Citywide
Slurry
Seal
Project.
Apply
Asphalt
Slurry
Seal
to
approx.
38
miles
of
city
roadways. 












400,000
 15
Bell CA Streets/Roads Alamo
Street
Reconstruc3on.
Reconstruct
asphalt
pavement
roadway,
curb
and
gufer,
and
sidewalk
along
0.5

mile
on
Alamo
Street.
Alamo
Street
is
a
bus
route. 












500,000
 25
Bell CA Streets/Roads Filmore
Ave.
Street
Rehabilita3on.
Reconstruct
asphalt
pavement
roadway,
curb
and
gufer,
sidewalk
along

3/10
of
a
mile
on
Filmore
Avenue. 












350,000
 25
Bell
Gardens CA CDBG New
Energy
Efficient
HVAC
System
for
John
Anson
Ford
Park
Gymnasium. 












750,000
 5
Bell
Gardens CA CDBG Centralized
Security
Camera
Installa3on
on
all
City
Buildings.(Sierra,
Ford
Park,
NYC,
BGV
Park,
City
Hall,
PD,

Skate
Park) 










1,000,000
 10
Bell
Gardens CA Energy John
Anson
Ford
Park
Gymnasium
Ligh3ng
System
Upgrade
to
Energy
Efficient/Green
Indoor
Recrea3onal

Ligh3ng. 












250,000
 5
Bell
Gardens CA Energy Construc3on
of
Running
Track
using
recycled
rubberized
3re
material
or
similar
recycled
product
for
the
main

surface.
This
project
would
include
Energy
Efficient/Green
outdoor
recrea3onal
ligh3ng,
and
drought
tolerant

landscaping.
 










1,500,000
 10
Bell
Gardens CA Energy Energy
Efficient/Green
Recrea3onal
Park
Ligh3ng
for
east
side
of
John
Anson
For
Park.
Possibly
u3lize
Solar

Panels
or
some
other
alterna3ve
energy
source. 










1,000,000
 10
Bell
Gardens CA Energy Energy
Efficient/Green
Public
Aqua3cs
Center
at
John
Anson
Ford
Park.
Complete
Renova3on
of
an
exis3ng

outdoor
seasonal
olympic
size
public
pool,
to
an
indoor,
energy
efficient
olympic
size
pool
with
ligh3ng,
HVAC

and
filtering
system
for
pool
system. 








10,000,000
 20
Bell
Gardens CA Public
Safety Police
Sta3on
Expansion
and
renova3on
including
public
parking
improvements,
opera3onal
improvements,

energy
efficient
ligh3ng,
green
technologies,
ADA
Compliance,
Emergency
Opera3ons
Center
and
new

training/classroom
facili3es.
 








17,000,000
 30
Bell
Gardens CA Streets/Roads Overlay
residen3al
streets
and
alleys
in
areas
south
of
Florence
Avenue
u3lizing
RAC
technology. 










2,000,000
 15
Bell
Gardens CA Streets/Roads Street
Paving
Rehabilita3on
including
the
use
of
Rubberized
Asphal3c
Concrete
technology,
including
local

street
reconstruc3on
and
resurfacing,
including
concrete
sidewalk
repairs,
concrete
wheelchair
ramps
per
ADA

standards,
Concrete
Transit
Bus
Pad 










2,500,000
 20
Bell
Gardens CA Transit Community
Electronic
Message
Boards
for
2
Main
City
Parks:
Bell
Gardens
Veterans
Park
and
John
Anson
Ford
Park.
Provide
customer
informa3on
screens
about
transit
and

community
events. 












250,000

Bell
Gardens CA Transit Ford
Park
Transit
Center/Fixed
Route
Park
&
Ride
Lot
Improvement.
This
project
involves
the
reconstruc3on,
enlargement
and
transporta3on
fixed
route
incorpora3on
of
an
exi3ng

public
parking
lot
into
a
transit
center
"hub"
where
members
of
public
can 










1,000,000

Bell
Gardens CA Water Rehabilita3on
of
sewer
lines
and
infrastructure
that
have
already
been
iden3fied
throught
closed
circuit
TV

inspec3on
and
hydraulic
modeling
in
accordance
with
the
City's
2008
adopted
Sanitary
Sewer
Master
Plan. 










6,000,000

Bell
Gardens CA Water Water
Main
Line
upgrades
and
replacements
in
City‐Owned
System
only.
In
accordance
with
the
City's
Water

Master
Plan
adopted
in
2008.
12
projects
iden3fied
and
priori3zed. 










3,000,000

Bell
Gardens CA Water The
Bell
Gardens
storm
water
drainage
system
has
3
lines
in
need
of
replacement
and
upgrades.
The
Florence

Avenue
Line
needs
to
be
replaced
and
upgraded
from
33"
line
to
a
45"
line.
The
Eastern
Avenue
Line
from
a

12"
to
a
24"
line.
The
Ira
Avenue
line
fro 










1,500,000
 10
Beverly
Hills CA Streets/Roads Grind
and
overlay
of
City
streets
and
alleys
(45
Miles)
in
the
City
of
Beverly
Hills
selected
u3lizing
the
City's

current
Pavement
Management
Plan
(PMP).
These
streets
were
last
rehabilitated
on
average
30
years
ago.
If

funded
the
project
can
commence
in 








10,000,000
 40
Beverly
Hills CA Water Replacement
and/or
rehabilita3on
of
approximately
2
miles
of
exis3ng
80
year
old
sewer
lines
throughout
the

city.
These
sewer
lines
will
be
selected
upon
comple3on
of
our
Sanitary
Sewer
Master
Plan
which
is
currently

being
updated
and
is
scheduled
to
b 










2,500,000
 20
Beverly
Hills CA Water Replacement
of
the
exis3ng
60
year
old
waterline
in
Charleville
Boulevard
from
El
Camino
Drive
to
Clark
Drive.

This
water
line
replacement
project
is
currently
under
design

and
will
be
adver3sed
for
bid
in
Feb.
2009
and

Construc3on
will
start
in
April 










2,500,000
 20
Beverly
Hills CA Water Replacement
of
the
exis3ng
five
50
year
old
water
reservoirs,
with
a
total
capacity
of
5.5
Million
gallons.
The

design
of
these
tanks
is
scheduled
to
commence
in
January
2009
and
construc3on
will
start
in
July
2009.
 










7,000,000
 50
Cathedral
City CA Housing Date
Palm
Drive
Widening
Project 








19,000,000
 50
Cathedral
City CA Streets/Roads Pavement
Rehabilita3on
Perez
Road 












977,531
 35
Cathedral
City CA Water South
City
Improvement
District 








15,000,000
 50
Cathedral
City CA Water Whitewater
Channel
Extension
43 










7,000,000
 100
Cerritos CA CDBG In
accordance
with
and
required
under
California
Redevelopment
Law,
the
City
of
Cerritos
has
approved
Cuesta

Villas,
a
247‐unit
affordable
senior
housing
development,
which
includes
a
13,000‐square‐foot
neighborhood

senior
recrea3on
center
and
a
4‐acre
parcel 








65,950,000
 400
Cerritos CA Energy Cerritos
Center
for
the
Performing
Arts
Audio
System:

Conversion
of
audio
system
from
analog
to
digital

technology
to
achieve
a
minimum
40%
increase
in
energy
efficiency 












250,000
 4
Cerritos CA Energy Replacement
of
Auto
Square
Signage:

upgrade
of
exis3ng
Cerritos
Auto
Square
full‐color
display
signage
with

LED
technology;
es3mated
60%
reduc3on
in
energy
usage 












500,000
 4
Cerritos CA Energy "Go
Green"
Supplemental
Power
System
for
Cerritos
Library:

installa3on
of
micro‐turbine
generators
in

accordance
with
California
state
requirements,
to
prevent
blackouts
and
reduce
adverse
environmental

impacts 












360,000
 5
Cerritos CA Energy Replacement
of
Library
Computers:

replacement
of
150
desktop
computers
to
reduce
energy
consump3on

and
provide
more
efficient
service
to
Library
patrons,
for
research
and
job
training
purposes 












250,000
 6
Cerritos CA Energy Swim
Center
Environmental
Control
System:

replacement
of
25‐year‐old
boiler
with
high‐efficiency

environmental
control
system,
to
reduce
energy
usage
by
approximately
70%
 












500,000
 8
Cerritos CA Energy Replacement
of
City
HVAC
System:

replacement
of
30‐year‐old
hea3ng/ven3la3on/air
condi3oning
system
at

Cerritos
Civic
Center
to
increase
energy
efficiency
and
convenience
for
the
public 










3,000,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Cerritos CA Energy Expansion
of
Cerritos
Library:

addi3on
of
3,000
square
feet
and
incorpora3on
of
energy‐efficient
ligh3ng

solu3ons 










4,200,000
 150
Cerritos CA Public
Safety Video
Monitoring/Public
Safety
‐‐
Cerritos
Park
Sites:

installa3on
of
up
to
200
security
cameras
at
various
park

sites
within
Cerritos 










2,800,000
 6
Cerritos CA Streets/Roads Project
No.
15100


Traffic
Signal
Coordina3on:
This
project
will
provide
traffic
signal
synchroniza3on
to
approximately
50
traffic
signals
located
on
arterial

streets
citywide. 












560,000
 4
Cerritos CA Streets/Roads Project
No.
13016


Marquardt
Bridge
Repair/Paint
This
project
includes
maintenance
and
repair
of
the
Marquardt
Bridge
at
the
Coyote
Creek
Flood
Control

Channel. 












290,000
 10
Cerritos CA Streets/Roads Project
No.
13086


Access
Ramps:
This
project
provides
the
resources
to
upgrade
access
ramps
at
various
loca3ons
citywide
to
comply
with
ADA

guidelines. 












230,000
 10
Cerritos CA Streets/Roads Project
No.
14077


Arterial
Street
Slurry
Seal:
This
project
will
provide
an
applica3on
of
slurry
seal
to
various
arterial
highways
in
Cerritos
as
part
of
an

ongoing
maintenance
project. 












230,000
 12
Cerritos CA Streets/Roads Project
No.
13032
Studebaker
Road
Construc3on
of
Landscaped
Median:
This
project
provides
for
the
construc3on
of
a
landscaped
median
on
Studebaker
Road
south
of
South
Street.


The
project
should
be
completed
in
conjunc3on
with
the
Studebaker
Road
Pa 












180,000
 14
Cerritos CA Streets/Roads Project
No.
14031

South
Street
Pavement
Rehabilita3on
and
Construc3on
of
Landscaped
Medians:
This

project
will
resurface
the
roadway
on
South
Street
Pioneer
Boulevard
and
Ely
Avenue
and
includes
the

construc3on
of
landscaped
medians. 












470,000
 14
Cerritos CA Streets/Roads Project
No.
13011
Valley
View
Boulevard
Pavement
Rehabilita3on:
This
project
will
resurface
the
southbound

side
of
Valley
View
Boulevard
between
the
northerly
Cerritos
City
limits
and
Artesia
Boulevard.

 












710,000
 20
Cerritos CA Streets/Roads Project
No.
13012
Marquardt
Avenue
Pavement
Rehabilita3on:
This
project
will
resurface
Marquardt
Avenue

between
Alondra
Boulevard
and
Artesia
Boulevard
and
includes
the
construc3on
of
landscaped
medians.
 










1,529,400
 20
Cerritos CA Streets/Roads Project
No.
13032
Studebaker
Road
Pavement
Rehabilita3on:
This
project
will
resurface
Studebaker
Road

between
South
Street
and
Del
Amo
Boulevard.

The
scope
of
the
project
includes
replacement
of
all
necessary

access
ramps. 












600,000
 20
Cerritos CA Streets/Roads Project
No.
13068
Equitable/Struikman/Befencourt
Pavement
Rehabilita3on:
This
project
will
resurface
Equitable
Road,
Struikman
Road
and
Befencourt
Street
between
Marquardt
Avenue

and
Edwards
Road.

 












950,000
 20
Cerritos CA Streets/Roads Project
No.
13101


Del
Amo
Boulevard
Pavement
Rehabilita3on:
This
project
will
resurface
the
roadway
on
the

westbound
side
of
Del
Amo
Boulevard
between
Denni
Street
and
the
San
Gabriel
River.

 










1,800,000
 20
Cerritos CA Streets/Roads Project
No.
13102


Keller/Fabrica/Bolsa
Streets
Pavement
Rehabilita3on:
This
project
will
resurface
the
roadway
on
Keller
Circle,
Fabrica
Way
and
Bolsa
Lane
between
Artesia
Boulevard

and
183rd
Street.

 












700,000
 20
Cerritos CA Streets/Roads Project
No.
13104


College
Place
Pavement
Rehabilita3on:
This
project
will
resurface
the
roadway
on
College
Place
west
of
Studebaker
Road.

The
scope
of
the
project

includes
replacement
of
all
necessary
access
ramps. 












230,000
 20
Cerritos CA Streets/Roads Project
No.
13105

Berwyn
Road
Pavement
Rehabilita3on:
This
project
will
resurface
the
roadway
on
Berwyn
Road
west
of
Valley
View
Avenue.

The
scope
of
the
project

includes
replacement
of
all
necessary
access
ramps. 












180,000
 20
Cerritos CA Streets/Roads Project
No.
14005


Artesia
Boulevard
Pavement
Rehabilita3on:
This
project
will
resurface
the
roadway
on
Artesia
Boulevard
between
Carmenita
Road
and
Valley
View
Avenue.


The
scope
of
the
project
includes
replacement
of
all
necessary
access
ramps. 












890,000
 20
Cerritos CA Streets/Roads Project
No.
14088


Residen3al
Street
Pavement
Rehabilita3on
This
is
an
ongoing
project
to
rehabilitate
residen3al
streets
throughout
the
City
based
upon
data
obtained
from

the
City’s
Pavement
Management
System.
 










1,200,000
 20
Cerritos CA Streets/Roads Replacement
of
Concrete
Intersec3ons:

This
project
will
provide
for
replacing
pavement
sec3ons
at
two

intersec3ons

within
the
Cerritos
Towne
Center
area.

The
deteriora3ng
concrete
pavements
at
the

intersec3ons
of
Shoemaker
Street
and
Artesia
Boule 












600,000
 20
Cerritos CA Streets/Roads Project
No.
73015
This
project
will
provide
for
replacing
an
obsolete
2‐lane
(1
lane
each
direc3on)
bridge
with

a
4‐lane
bridge
over
Coyote
creek
along
Del
Amo
Boulevard
which
is
a
major
thoroughfare
connec3ng
Los

Angeles
and
Orange
Coun3es. 








17,000,000
 60
Cerritos CA Water Project
No.
17028


Befencourt
Reclaimed
Waterline
replacement:
This
project
will
replace
the
reclaimed
waterline
between
Befencourt
and
Rainbow
parks. 












340,000
 10
Cerritos CA Water Project
No.
17100


Water
Valve
Replacement
Project:
This
project
will
replace
the
water
valves
for
the
potable

water
system
main
lines
at
various
loca3ons
citywide.
 












400,000
 10
Chino
Hills CA CDBG Los
Serranos
Infrastructure
Phase
1B 










2,300,000
 15
Chino
Hills CA CDBG Los
Serranos
Water
Main
Replacement
Phase
VII
Project.

This
project
has
been
designed
and
is
ready
to
bid
for

construc3on. 










2,100,000
 15
Chino
Hills CA Streets/Roads Rolling
Ridge
Phase
II
Pavement
Restora3on
Project 












275,000
 10
Chino
Hills CA Water Arsenic
Remedia3on
in
City
Drinking
Wells 












300,000
 3
Chula
Vista CA CDBG Rienstra
Sports
Park
‐
erosion
control
improvements 












100,000
 1
Chula
Vista CA CDBG Loma
Verde
stairway
renova3on
for
ADA
accessibility 












150,000
 2
Chula
Vista CA CDBG Parks
concrete
sidewalk
renova3on,
citywide 












200,000
 2
Chula
Vista CA CDBG Chula
Vista
Visitor
Center
Renova3on 












200,000
 3
Chula
Vista CA CDBG Fire
Sta3on
No.
4
Training
Facility
‐
upgrade
exis3ng
facili3es 












200,000
 3
Chula
Vista CA CDBG Park
trash/recycling
enclosures,
citywide 












250,000
 3
Chula
Vista CA CDBG Walking/running
trail
renova3on
&
improvement
in
various
parks 












250,000
 3
Chula
Vista CA CDBG Memorial
park
arbor
&
water
feature
restora3on 












350,000
 5
Chula
Vista CA CDBG Park
restroom
construc3on/renova3on,
citywide 












475,000
 6
Chula
Vista CA CDBG City
trails
‐
renova3ons
and
improvements 












500,000
 7
Chula
Vista CA CDBG Park
irriga3on
systems
upgrades/moderniza3on,
citywide 












500,000
 7
Chula
Vista CA CDBG Park
restroom
replacement,
citywide 












500,000
 7
Chula
Vista CA CDBG Rohr
Park
jogging
trail
renova3on 












500,000
 7
Chula
Vista CA CDBG Sunset
View
Park
‐
dog
park
construc3on 












500,000
 7
Chula
Vista CA CDBG GPS
mapping
of
trail
markers
to
produce
maps
for
trailhead
kiosks
and
public
website 












750,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Chula
Vista CA CDBG Norman
Park
Senior
Center
equipment
&
community
mee3ng
space
&
office
space
repair/replacement 












850,000
 11
Chula
Vista CA CDBG Greg
Rogers
Park
upgrades
‐
Irriga3on
improvements
and
storage,
picnic
shelter
and
restroom
constru3on 












900,000
 12
Chula
Vista CA CDBG ADA
ramp
construc3on
in
various
city
parks 










1,000,000
 13
Chula
Vista CA CDBG Park
parking
lot
repaving,
citywide 










1,000,000
 13
Chula
Vista CA CDBG Rohr
Park
upgrades
‐
Irriga3on
improvements,
restrooms,
picnic
shelters
&
trash
enclosures 










1,150,000
 15
Chula
Vista CA CDBG Rohr
Manor
historical
building
repair 










1,500,000
 19
Chula
Vista CA CDBG Eucalyptus
Park
‐
add
ballfields/restore
picnic
shelters
&
restroom 










1,500,000
 20
Chula
Vista CA CDBG Chula
Vista
Nature
Center
‐
parking
lot
reloca3on,
including
acqusi3on 










2,000,000
 26
Chula
Vista CA CDBG Loma
Verde
Recrea3on
Center
renova3on/upgrades
including
children's
front
safety
area,
rear
pa3o
area
for

community
events 










2,000,000
 26
Chula
Vista CA CDBG Women's
Club
historical
building
upgrades
&
repairs 










2,000,000
 26
Chula
Vista CA CDBG All
Season's
Neighborhood
Park
construc3on 










3,000,000
 39
Chula
Vista CA CDBG Lauderbach
Recrea3on
Center
repair/replacement 










3,000,000
 39
Chula
Vista CA CDBG South
Chula
Vista
Library
‐
Patron
comfort
retrofits
&
upgrade
building
systems
to
current
energy
standards 










3,000,000
 39
Chula
Vista CA CDBG Install
6"
HP
Gas
in
Main
St.,
Oleander
to
Maxwell
and
in
Maxwell
to
serve
Chula
Vista
Transit,
Public
Works,

Sweetwater
Union
High
School
District
CNG
fleets
and
others 










3,500,000
 45
Chula
Vista CA CDBG Ballfield
ligh3ng
upgrades
‐
install
Musco
green
ligh3ng
at
6
sites 










4,300,000
 56
Chula
Vista CA CDBG Expand
Fire
Sta3on
Training
Facility
for
"real
3me"
training 










5,000,000
 65
Chula
Vista CA CDBG Open
space
brush
clearance,
citywide 










5,000,000
 65
Chula
Vista CA CDBG Chula
Vista
Animal
Shelter
upgrades
‐
energy
retrofits
and
expansion
&
improvemetn
of
animal
holding
areas 










6,000,000
 78
Chula
Vista CA CDBG Reloca3on
and
construct
new
Fire
Sta3on
No.
5
(3‐bay
facility) 








12,000,000
 155
Chula
Vista CA CDBG Lauderbach
Recrea3on
Center
parking
lot
expansion
including
property
acquisi3on 








13,000,000
 169
Chula
Vista CA CDBG Civic
Center
Library
renova3on
&
upgrade
of
bulding
systems
to
current
energy
standards
and
public
needs 








15,000,000
 195
Chula
Vista CA CDBG Reconstruct
Fire
Sta3on
No.
1
as
a
5‐bay,2‐story
facility
with
a
permanent
emergency
opera3ons
center
(EOC),

incl
equipment,
furnishings
and
communica3on 








17,000,000
 220
Chula
Vista CA CDBG Construct
Regional
Fire
Training
Facility 








20,000,000
 260
Chula
Vista CA CDBG Rancho
Del
Rey
Library
‐
construct
30,000
SF
facility 








20,000,000
 260
Chula
Vista CA CDBG Convert
mul3‐purpose
fields
from
grass
to
ar3ficial
turf
in
various
parks
citywide 








25,000,000
 325
Chula
Vista CA Public
Safety Interim
Emergency
Opera3ons
Center
(EOC)
upgrades 












300,000
 4
Chula
Vista CA Streets/Roads Elm
Ave.
improvements
between
Naples
and
Oxford
Streets 










1,500,000
 12
Chula
Vista CA Streets/Roads Bonita
Rd.
@
Allen
School
box
culvert
construc3on 










1,000,000
 13
Chula
Vista CA Streets/Roads Glenhaven
street
improvements
between
1st
&
west
end 










1,500,000
 19
Chula
Vista CA Streets/Roads Naples
St.
improvements
between
3rd
&
Alpine
Avenues 










1,500,000
 19
Chula
Vista CA Streets/Roads 2nd
Ave.
improvements
between
Naples
&
Palomar
Streets 










2,500,000
 32
Chula
Vista CA Streets/Roads ADA
ramps
within
RAS
&
local
streets
citywide
(design‐build) 










2,500,000
 32
Chula
Vista CA Streets/Roads Broadway
widening/reconstruc3on,
Main
St.
to
southerly
city
limits 










2,500,000
 32
Chula
Vista CA Streets/Roads Hilltop
Dr.
from
East
I
St.
to
Shasta
St.
drainage
improvements 










2,500,000
 32
Chula
Vista CA Streets/Roads Oxford
St.
improvements
between
3rd
&
1st
Avenues 










2,500,000
 32
Chula
Vista CA Streets/Roads Tree
plan3ng
&
establishment
in
parkways
citywide 










2,500,000
 32
Chula
Vista CA Streets/Roads H
St.
CMP
storm
drain
project
between
1st
&
2nd
Avenues 










3,000,000
 39
Chula
Vista CA Streets/Roads Third
Avenue
Village
promenade
improvements 










3,300,000
 43
Chula
Vista CA Streets/Roads N.
Broadway
basin
storm
drain
&
st
improvements
along
Broadway
corridor
from
D
St
to
northerly
City
of

Chula
Vista
limits 










4,000,000
 52
Chula
Vista CA Streets/Roads ADA
ramps
within
various
RAS
&
local
streets
(design‐build) 










5,000,000
 65
Chula
Vista CA Streets/Roads ADA
ramps
within
various
RAS
&
local
streets
(design‐build) 










5,000,000
 65
Chula
Vista CA Streets/Roads 1st
Ave.
to
K
St.
storm
drain
construc3on
(Telegraph
Canyon
Channel) 










6,500,000
 84
Chula
Vista CA Streets/Roads Otay
Lakes
Rd.
&
East
H
St.
widening,
Telegraph
Canyon
Rd.
to
Ridgeback
Rd. 










7,000,000
 91
Chula
Vista CA Streets/Roads I‐805/Main
St.
undercrossing
widening 










7,500,000
 97
Chula
Vista CA Streets/Roads 3rd
Ave.
&
L
St.
storm
drain
construc3on
(Telegraph
Canyon
Channel) 








10,000,000
 130
Chula
Vista CA Streets/Roads CMP
replacement/rehab
within
RAS
&
local
streets
citywide 








10,000,000
 130
Chula
Vista CA Streets/Roads CMP
replacement/rehab
within
RAS
&
local
streets
citywide 








10,000,000
 130
Chula
Vista CA Streets/Roads Install
missing
sidewalk
citywide
within
RAS
&
local
streets 








10,000,000
 130
Chula
Vista CA Streets/Roads Unimproved
alley
paving
program
citywide
(design‐build) 








10,000,000
 130
Chula
Vista CA Streets/Roads I‐805
southbound
off‐ramp
improvements,
Telegraph
Canyon
Rd. 








15,000,000
 195
Chula
Vista CA Streets/Roads Install
missing
sidewalk
citywide
within
RAS
&
local
streets 








15,000,000
 195
Chula
Vista CA Streets/Roads Pavement
reconstruc3on
on
local
streets
citywide 








15,000,000
 195
Chula
Vista CA Streets/Roads Pavement
overlay
on
various
City
RAS
and
local
streets
citywide 








20,000,000
 260
Chula
Vista CA Streets/Roads Pavement
reconstruc3on/overlay
on
RAS
&
local
streets
citywide 








20,000,000
 260
Chula
Vista CA Streets/Roads SR‐125/Rock
Mountain
interchange
(design‐build) 








27,000,000
 351
Chula
Vista CA Streets/Roads Full
street
improvements
‐
Safe
Routes
to
School 








65,000,000
 844
Chula
Vista CA Transit Citywide
bus
shelters
(50
priority
loca3ons) 










1,000,000
 13
Chula
Vista CA Transit Transit
Center
improvements
@
Southwestern
College 










1,000,000
 13
Chula
Vista CA Water Sewer
capacity
enhancement
‐
Priority
2
projects 










1,700,000
 22
Chula
Vista CA Water Chula
Vista
Nature
Center
permanent
sewer/water
lines 










2,000,000
 26
Chula
Vista CA Water J
Street/Marina
Parkway
sewage
lib
stage
sta3on
rehabilita3on 










2,000,000
 26
Chula
Vista CA Water Sewage
lib
sta3on
rehabilita3on
projects 










2,050,000
 27
Chula
Vista CA Water Sewer
replacement
‐
Priority
1
projects 










3,600,000
 47
Chula
Vista CA Water Sewer
rehabilita3on
‐
Priority
1
projects 










5,380,000
 70
Chula
Vista CA Water Sewer
capacity
enhancement
‐
Priority
1
projects 










5,520,000
 72
Citrus
Heights CA Streets/Roads Carbon
Footprint
Reduc3on
Program
‐
Safety
Lights.

Replace
Mercury
Vapor
street
ligh3ng‐
replace
with

induc3on
ligh3ng
along
major
arterials 










1,000,000
 4
Citrus
Heights CA Streets/Roads Pavement
reconstruc3on
and
rehabilitaion
on
Fair
Oaks
Blvd.
from
OakAvenue
to
Old
Auburn
Road 












490,000
 4
Citrus
Heights CA Streets/Roads Twin
Oaks
Ave
Reconstruc3on
and
rehabilita3on;
between
Twin
Oaks
Ave.
and
SUnrise
Blvd. 












570,000
 4
Citrus
Heights CA Streets/Roads Road
reconstruc3on
and
rehabilita3on 












780,000
 13
Citrus
Heights CA Streets/Roads Lauppe
Lane
Drainage
reconstruc3on
and
replace
exis3ng
in‐situ
lining
of
exis3ng
detoriated
corrugated
pipe

to
prevent
flooding 










1,000,000
 15
Citrus
Heights CA Streets/Roads Old
Auburn
Road
Reconstruc3on
and
rehabilita3on 












910,000
 16
City State Program Project
Descrip3on Funding
Required Jobs
Citrus
Heights CA Streets/Roads Old
Auburn
Road
reconstruc3on
and
rehabilita3on
and
construct
Class
I
Bikeway
along
Old
Auburn
Road,

between
Fair
Oaks
and
Wachtel 












900,000
 16
Citrus
Heights CA Streets/Roads Sunrise
Blvd.
Pedestrian
Safety.

Infill
sidewalk
along
SUnrise
Blvd.
to
increase
pedestrian
safety
and
promote

walkability
and
ADA
compliance 










1,180,000
 16
Citrus
Heights CA Streets/Roads Pedestrian
Safety
Project
‐
Greenback
Lane
from
Mariposa
West
to
west
of
Birdcage.

Reconstruct
center

medians
for
pedestrainand
vehicle
safety;
install
safety
barriers
to
eliminate
illegal
foot
traffic
across

Greenback
Lane 










1,500,000
 20
Citrus
Heights CA Streets/Roads Carbon
Footprint
Reduc3on.
Retrofit,
construct
ligh3ng
facili3es
to
allow
for
installa3on
and
use
of
solar
panels

to
generate
energy
for
Civic
Complex
and
adjacent
street
lights. 










9,000,000
 35
Citrus
Heights CA Streets/Roads Sidewalk
and
ADA
Improvemtns.

Reconstruct
sidewalks
with
trip
hazards,
install
new
ADA
compliant
ramps
to

improve
pedestrain
safety;
reconstruct
rolled
curbing
along
arterials,
convert
to
ver3cal
curbing
to
improve

pedestrain
safety
and
walkability 










7,000,000
 40
Citrus
Heights CA Streets/Roads Auburn
Blvd.
Enhancement/Reconstruc3on/Rehabillata3on.

Underground

all
overhead
u3li3es
for
safety;

widen
roadway
to
include
bicycle
lanes;
eliminate
leb
turn
lanes
and
construct
medians
for
pedestran
and

vehicle
safety;
construct
new
ver3cal
curb 








22,000,000
 250
Compton CA CDBG Storm
Drain
Compliance
Project
‐
The
City
proposes
to
use
funds
to

comply
with
heightened
state
compliance
standards
to
reduce
trash,

chemicals
and
sanitary
overflows
into
the
storm
sewer
system.

Sub‐elements
include:

storm
drain
screens;

soil
filtrat 










2,500,000
 10
Compton CA CDBG Park
Improvements
‐
The
City
will
complete
the
installa3on
of

ar3ficial
surfaces
on
soccer
fields
to
reduce

damage
and
maintenance
costs
due
to
high
usage
by
residents. 










1,500,000
 15
Compton CA CDBG “Re‐Opening
Doors
Of
Opportunity”
Program
‐
“Re‐Opening
Doors
of
Opportunity”
Employment

Training/Placement
Program
proposes
to
implement
a
comprehensive
employment
training
and
placement

program
to
serve
the
special
needs
popula3on
(ex‐felons,
ex‐offend 










3,000,000
 24
Compton CA CDBG Summer
Youth
Employment
Program
‐
Federal
funding
will
support
youth
summer
employment
programs.


Program
par3cipants
will
assist
city
crews
working
on
infrastructure
improvements
through
assignment
to
an

appren3ceship
program
targe3ng
construc3on
 












250,000
 50
Compton CA Energy Weatherize
various
City
facili3es
to
improve
energy
efficiency 










1,300,000
 14.44
Compton CA Public
Safety Enhanced
camera
system
‐
Provides
addi3onal
funding
for
citywide
camera
system
being
installed
in
2009.


Would
provide
for
addi3onal
cameras,
shot
spofer
system
and
license
plate
capture
enhancements 










1,500,000
 20
Compton CA Public
Safety Fire
Sta3on
‐
Funding
will
allow
for
the
construc3on
of
a
new
fire
sta3on
that
will
accommodate
two
addi3onal

pieces
of
equipment
and
allow
the
department
to
provide
adequate
fire
protec3on
for
the
east‐side

community.
The
replacement
of
Sta3on
Two 










8,000,000
 72
Compton CA Schools Renova3ons
and
addi3ons
to
7
elementary
schools 








27,000,000
 300
Compton CA Streets/Roads Reconstruc3on
of
the
Rosecrans
Overhead
‐
The
City
will
reconstruct
an
exis3ng
overhead
in
order
to
facilitate

traffic
and
circula3on
between
the
Willowbrook
Avenue
and
Alameda
Street
rail
corridors. 










3,100,000
 37
Compton CA Streets/Roads Transporta3on
Infrastructure
Improvements
‐

Federal
funding
will
be
u3lized
to
resurface,
restore
and

rehabilitate
deteriorated
residen3al
and
local
streets
throughout
the
Compton
community. 








23,000,000
 236
Compton CA Transit Improve
access
to
bus
stops 












500,000
 5.56
Compton CA Transit Real
3me
bus
informa3on 










1,500,000
 16.67
Compton CA Transit Purchase
five
(5)
35'
CNG
transit
buses 










2,000,000
 20
Compton CA Water Storm
Drain
Compliance
Improvements
‐
In
order
to
comply
with
new
state
guidelines
to
reduce
the

introduc3on
of
pollutants
into
Compton
Creek.

These
improvements
include:
Installa3on
of
trash
screens
on

all
storm
drains
on
city
streets. 










2,500,000
 10
Compton CA Water Water
System
Improvements
‐
The
City
of
Compton
has
approximately
200
miles
of
piping
which
is
between
2”

to
24”
in
diameter.

The
City
proposes
to
replace
40
miles
of
this
piping
to
enhance
u3lity
infrastructure. 








40,000,000
 300
Covina CA CDBG Teen
Center
Renova3on
Project
‐‐
Renovate
restrooms
for
ADA
complaince;
renovate
computer
and
movie

rooms;
3nt
skylights
for
energey
efficiency
and
savings. 














96,700
 10
Covina CA CDBG Aqua3cs
Facility
Improvements
‐‐
To
improve
safety
and
energy
efficiency
includes
installa3on
of
shade
covers;

replace
drain
per
Graeme
Baker
Pool
&
Spa
Safety
Act;
replace
hea3ng
with
enery
efficient
system;
replastering

and
repain3ng
of
interior
of
 












220,500
 20
Covina CA CDBG Covina
Park
Sport
Facility
Improvements
‐‐
Includes
renova3on
of
communiuty
basketball
courts,
sobball

infield,
roller
hockey
rink
and
renovate
jogging
track
from
dirt
to
synthe3c
rubber. 












240,000
 20
Covina CA CDBG Construc3on
of
new
community/interpre3ve
sport
center
&
restora3on
of
Charter
Oak
Wash
in
the
San

Gabriel
Watershed.
Work
in
the
wash
includes
erosion
control,
removal
of
exposed
pipe
&
non‐na3ve
plants,

installa3on
of
signage
&
plant
na3ve
trees
al 










1,090,000
 50
Covina CA Public
Safety Digital
In‐Car
Video
Solu3on
‐‐
Capture
and
store
field
patrol
ac3vity.
Enhance
officer
safety
and
improve

agency
accountability
as
well
as
advanncing
criminal
prosecu3on
and
case
resolu3on.
Aid
homeland
security

efforts.
 












200,000

Covina CA Public
Safety Street
Crimes
Impact
Team
‐‐
With
addi3on
of
two
police
officers

SCI
Team
could
be
formed
to
address

increased
crime
in
the
community
through
educa3on
of
community
businesses
and
neighborhoods,
increased

technology
and
safety
measures. 












241,900
 2
Covina CA Water Charter
Oak
Reservoir
Electrical
Service
‐‐
Install
new
500
amp
3‐phase
480
volt
Y
service
with
sob
starts 














55,000
 3
Covina CA Water Charter
Oak
Reservoir
Pump
Enclosures
‐‐
Construct
permanenet
enclosures
for
water
circula3on
pumps. 














30,000
 5
Covina CA Water Cypress
Reservoir
Pump
Enclosures
‐‐
Construct
permanent
enclosures
for
water
circula3on
pumps. 














45,000
 5
Covina CA Water Forestdale
Reservoir
Pump
Enclosures
‐‐
Construct
permanent
enclosures
for
water
circula3on
pumps. 














30,000
 5
Covina CA Water Rancho
La
Merced
Reservoir
Pump
Enclosures
‐‐
Construct
permanenet
enclosures
for
water
circula3on

pumps. 














20,000
 5
Covina CA Water Rancho
Simi
Reservoir
Pump
Enclosures
‐‐
Construct
permanenet
enclosures
for
water
circula3on
pumps. 














35,000
 5
Covina CA Water Roycove
Reservoir
Circula3on
Piping
‐‐
Modify
inlet/outlet
piping
to
improve
storage
tank
circula3on. 














35,000
 5
Covina CA Water Cypress
Reservoir
Tank
Lining
‐‐
Crack
repair
and
epoxy
coa3ng
of
exis3ng
concrete
reservoir.
 












250,000
 10
Covina CA Water Charter
Oak
Reservoir
Roof
Replacement
‐‐
Replacement
of
exis3ng
wooden
roof
with
aluminum
dome. 












650,000
 15
Covina CA Water Cypress
Reservoir
Roof
Replacement
‐‐
Replace
exis3ng
roof
with
prefabricated
aluminum. 












450,000
 15
Cypress CA Streets/Roads Installa3on
of
traffic
Signal
at
Ball
Road
and
Grindlay
Street

 












300,000
 20
Cypress CA Streets/Roads Intersec3on
Improvement
@
Cerritos
Avenue
and
Valley
View
Street 












260,000
 20
Cypress CA Streets/Roads Intersec3on
Improvement
@
Cerritos
Avenue
and
Walker
Street
 












370,000
 20
Cypress CA Streets/Roads Moody
Street
Beau3fica3on


 










1,500,000
 50
Cypress CA Streets/Roads Signal
&
Transpota3on
Improvements


 










2,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Cypress CA Streets/Roads Street
Rehabilita3on


 










2,500,000
 50
Elk
Grove CA Amtrak Elk
Grove
Mul3modal
Sta3on
(Amtrak
Sta3on) 










7,000,000
 279
Elk
Grove CA Streets/Roads I‐5/Elk
Grove
Boulevard
Northbound
on‐ramp
Improvement 












200,000
 8
Elk
Grove CA Streets/Roads At
Grade
Crossing
Improvements
for
Dwight
and
Sims
Quiet
Zone 












500,000
 20
Elk
Grove CA Streets/Roads Route
99
Bike/Pedestrian
Overcrossing 










3,000,000
 120
Elk
Grove CA Streets/Roads Intelligent
Transporta3on
System 










5,000,000
 199
Elk
Grove CA Streets/Roads Route
99/Elk
Grove
Boulevard
Interchange
Improvement 










9,000,000
 359
Elk
Grove CA Streets/Roads Roadway
Rehabilita3on
on
various
City
of
Elk
Grove
streets 








10,000,000
 398
Elk
Grove CA Streets/Roads Grant
Line
Road
Widening
(segment
of
Capital
Southeast
Connector) 








30,000,000
 1195
Encinitas CA Streets/Roads Citywide
sidewalk,
curb
&
gufer,
cross
gufer,
and
pedestrian
ramp
replacement 












400,000
 10
Encinitas CA Streets/Roads Encinitas
Bl,
Leucadia
Bl,
Piraeus
St
&
San
Elijo
Bl
overlays 










3,000,000
 30
Encinitas CA Streets/Roads Encinitas/North
County
Transit
District
transit
parking
lot
(located
on
South
Vulcan
Av
&
E
St 










1,000,000
 35
Encinitas CA Water Corrosion
protec3on
for
ten
underground
u3lity
vaults 












100,000
 5
Encinitas CA Water Fourth
St
storm
drain 












900,000
 15
Folsom CA CDBG Folsom
Senior
Center
Expansion. 










3,750,000

Folsom CA CDBG Folsom
Sports
Complex
Second
Floor
Expansion 










4,800,000

Folsom CA Housing Willow
Creek
Village.

 










5,700,000

Folsom CA Public
Safety Fire
Sta3on
#39.

Construct
LEED‐cer3fied
fire
sta3on. 










3,600,000

Folsom CA Streets/Roads Bike
Boulevard
at
School,
Dean,
and
Coloma
Streets 












850,000

Folsom CA Streets/Roads Blue
Ravine
Rd./Folsom
Blvd.
Roadway
and
Bike/Ped
Improvements 










5,350,000

Folsom CA Streets/Roads Blue
Ravine
Road
Widening 










1,250,000

Folsom CA Streets/Roads Bridge
below
Folsom
Dam
Phase
2.

Widen
approach
and
construct
bike/pedestrian
access. 










5,250,000

Folsom CA Streets/Roads Bridge
below
Folsom
Dam.

Complete
construc3on
of
Folsom
Lake
Crossing. 










2,500,000

Folsom CA Streets/Roads East
Bidwell
Bike/Pedestrian
Overcrossing. 












850,000

Folsom CA Streets/Roads Folsom
Historic
District
Streetscape
Improvements. 










4,000,000

Folsom CA Streets/Roads Folsom
Parkway
Rail
Trail. 










3,200,000

Folsom CA Streets/Roads Folsom
Placerville
Rail
Trail
‐
Regional
Segment. 








18,950,000

Folsom CA Streets/Roads Folsom
Placerville
Rail
Trail. 












950,000

Folsom CA Streets/Roads HBWC
Trail. 










1,200,000

Folsom CA Streets/Roads Intelligent
Transporta3on
Systems.
Citywide
Fiber
Op3c
Network
for
traffic
control. 










1,800,000

Folsom CA Streets/Roads Lake
Natoma
Trail
Gap
Closure. 










3,250,000

Folsom CA Streets/Roads Riley
Street
Corridor
Improvements. 










2,000,000

Folsom CA Streets/Roads Roadway
rehabilita3on.

Various
loca3ons
throughout
City. 










2,428,557

Folsom CA Streets/Roads US
50
Empire
Ranch
Road
Interchange.

Construct
interchange. 








37,000,000

Folsom CA Transit Folsom
Stage
Lines
Van
Replacement. 












488,000

Folsom CA Transit Lightrail
Park
&
Ride
Lot
Expansion
at
Iron
Point. 










1,000,000

Folsom CA Water Folsom
South
Canal
Intake
and
Conveyance. 








20,000,000

Folsom CA Water Major
drainage
infrastructure
rehabilita3on,
replacement,
and
construc3on. 










2,200,000

Folsom CA Water Sewer
rehabilita3on
in
older
sec3ons
of
City. 










6,875,000

Folsom CA Water Water
Infrastructure
Rehabilita3on.

Rehabilita3on
throughout
City,
including
leak
detec3on
and
mi3ga3on. 








12,000,000

Fountain
Valley CA Energy Hybrid
HVAC/Night
Shib
system
with
solar
powered
air
handlers 












800,000
 5
Fountain
Valley CA Streets/Roads Sidewalk
Removal
and
Replacement
‐
fixes
damaged
sidewalks
that
create
hazardous
walking
condi3ons
for

pedestrians
and
trip
and
fall
claims
against
the
City
and
other
local
agencies. 










1,000,000
 10
Fountain
Valley CA Streets/Roads Residen3al
Pavement
Rehabilita3on
Project
‐
many
of
ours
are
40‐50
years
old
and
have
passed
their
useful

service
life.
They
are
in
need
of
more
than
a
slurry
or
cape
seal.
We
began
this
program
just
this
past
year,
but

we
have
a
substan3al
backlog
to 










2,000,000
 20
Fountain
Valley CA Water Sewer
Lib
Sta3on
on
Ward
St. 










2,500,000
 10
Fountain
Valley CA Water Pump
Sta3ons
(2) 










5,000,000
 20
Fresno CA CDBG Downtown
and
Citywide
Landscape
Irriga3on.

Many
tree
wells
and
streetscape
areas
are
without
irriga3on

systems
in
place.

Connect
to
water
supply,
plumbing
to
benefit
areas,
installa3on
of
water
conserva3on

appropriate
irriga3on
systems,
etc. 










4,000,000
 20
Fresno CA CDBG Neighborhood
improvement
program.

Economically
challenged
and
older
neighborhoods
need
street,

sidewalk,
curb,
gufer,
streetlight,
pedestrian
support,
landscape,
and
drainage
improvements. 








27,000,000
 50
Fresno CA Streets/Roads Shaw
&
Polk
Intersec3on
Improvements.

Expansion
of
intersec3on,
right‐of‐way
acquisi3on,
signaliza3on

enhancements,
streetscape
and
hardscape
improvements. 










1,400,000
 5
Fresno CA Streets/Roads Ashlan
Avenue
west
of
Freeway
99.

Street
widening,
right‐of‐way
acquisi3on,
paving,
curbs,
sidewalks,
and

gufer. 










2,000,000
 7
Fresno CA Streets/Roads Willow
Avenue,
Shepherd
to
Behymer.

Extends
street
infrastructure
improvements
to
the
north
that
currently

terminate
at
Shepherd.

Curb,
sidewalk,
gufer,
undergrounding
of
verhead
u3li3es,
trail,
and
pavement. 










2,000,000
 7
Fresno CA Streets/Roads Clovis
Avenue,
McKinley
to
Kings
Canyon.

Improvement
to
travel
lanes,
median
islands,
bridge
crossings,

sidewalks,
gufers,
and
trails. 










2,500,000
 9
Fresno CA Streets/Roads Bofleneck
removal.

Six
loca3ons
in
the
City
where
short
undeveloped
areas
have
created
travel
lane

boflenecks
(two
lanes
down
to
one,
and
then
back
to
two)
on
major
streets.

Tight‐of‐way
acquisi3on,
paving,

curbs,
sidewalks,
and
gufer. 










3,000,000
 10
Fresno CA Streets/Roads California
Avenue.

Shelf
ready
roadyway
enhancement
project
that
supports
a
Hope
VI
project.

Street

widening,
median
island
construc3on,
landscape,
and
pavement
improvement. 










3,900,000
 10
Fresno CA Streets/Roads Friant
Road,
Copper
to
Audubon,
southbound
lanes.

These
travel
lanes
support
industry
and
heavy
trucks,
as

well
as
residen3al
commuter
traffic.

Overlay
paving,
other
structural
support
work,
and
curbing
to
help

prevent
future
water
erosion. 










3,500,000
 10
Fresno CA Water Herndon
Canal
Pipeline.

Undergrounding
of
open
canal
for
roadway
improvement,
pedestrian
safety,
and

water
quality
protec3on. 












700,000
 8
Glendora CA CDBG Development
of
solar
energy
recep3cles
over
parking
stalls
at
Pompei
Regional
Park 












975,000
 20
Glendora CA CDBG Sewer
reconstruc3on
on
Laurel
Avenue 












425,000
 25
Glendora CA CDBG Sewer
reconstruc3on
on
Palopinto
Avenue. 












390,000
 25
Glendora CA CDBG Sewer
reconstruc3on
on
Treanor
Avenue 












400,000
 25
Glendora CA CDBG Sewer
reconstruc3on
on
Barranca
Avenue
associated
with
the
Monrovia
Nursery
Estates
area 










1,950,000
 30
Glendora CA CDBG Sewer
reconstruc3on
on
Lorraine
Avenue 












975,000
 30
Glendora CA CDBG Sewer
reconstruc3on
on
Valley
Center
Avenue 










1,250,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Glendora CA CDBG Parking
Structure
for
the
La
Fetra
Senior
Center.

The
center
is
underpark
for
the
amount
of
patrons
using
the

facility
due
this
high
volume
and
the
use
of
the
park
which
serves
as
a
primary
place
of
girls
sobball
ac3vi3es. 










1,900,000
 35
Glendora CA CDBG Parking
Structure
in
the
Glendora
Downtown
Village/Bus
Plaza
lots.

This
would
add
approximately
120
spaces

and
thus
allow
businesses
to
expand
or
locate
in
this
historic
area
without
need
for
providing
parking
area 










2,490,000
 55
Glendora CA CDBG Sewer
reconstruc3on
on
Foothill
Avenue
between
Barranca
Avenue
and
Valley
Center 










1,800,000
 55
Glendora CA CDBG Various
water
conserva3on
projects
associated
with
the
Glendora
and
Charter
Oak
Unified
School
District.


Such
a
program
would
become
a
win‐win
for
all
en33es.

The
schools
are
facing
budget
shorzalls
and
any

money
they
can
save
in
water
and
facility
 










3,000,000
 75
Glendora CA CDBG Sewer
reconstruc3on
on
Arrow
Highway
between
Valley
Center
and
Barranca
Avenue. 










2,750,000
 125
Glendora CA CDBG Police
Department
Building
Renova3on.

The
building
was
built
in
the
1960
when
the
popula3on
was
one‐third

of
what
it
is
today.

The
facility
is
undersized
and
inadequate
for
the
city's
public
safety
needs.

Replacement

would
provide
sufficient
room 








14,500,000
 250
Glendora CA Energy Solar
power
panel
funding
to
assist
small
business
owners
with
the
installa3on
costs. 












975,000
 45
Glendora CA Energy Solar
power
panel
funding
to
assist
low
and
moderate
income
house
hold
owners
with
installa3on
costs
for

energy
reduc3on. 










1,950,000
 55
Glendora CA Public
Safety Replacement
of
a
school
resource
officer
posi3on
which
was
lost
when
the
school
district
had
to
cut
funding

due
to
state
budget
cut
backs 












250,000
 2
Glendora CA Public
Safety CAD,
GIS
and
Records
Management
system
upgrades 










2,490,000
 11
Glendora CA Schools School
energy
efficiency,
including
solar
panel
installa3on,
program 










4,500,000
 155
Glendora CA Streets/Roads Reconstruc3on
of
Foothill
Boulevard
between
Grand
Avenue
and
Cullen
Avenue 










1,800,000
 15
Glendora CA Streets/Roads Reconstruc3on
of
Glendora
Avenue
between
Sierra
Madre
Avenue
and
Foothill
Avenuen 












750,000
 15
Glendora CA Streets/Roads Reconstruc3on
of
Arrow
Highway
between
Valley
Center
and
Grand
Avenue 










2,900,000
 17
Glendora CA Streets/Roads Reconstruc3on
of
Gladstone
Street
between
Grand
Avenue
and
Sunflower
Avenue 










2,000,000
 17
Glendora CA Streets/Roads Reconstruc3on
of
City
Alley's
throughout
the
City
that
are
substandard. 










3,000,000
 22
Glendora CA Streets/Roads Reconstruc3on
of
Route
66
between
Barranca
Avenue
and
Lone
Hill
Avenue 










3,000,000
 30
Glendora CA Water Foothill
Avenue
Water
Line
reconstruc3on
between
Grand
Avenue
and
Cullen
Avenue 










1,900,000
 35
Glendora CA Water Juanita
Avenue
Water
Line
reconstruc3on. 










1,950,000
 45
Glendora CA Water Water
Nitrate/Percholorate
Treatment
Plant
for
Irwindale
Water
Well
Site 










5,750,000
 55
Glendora CA Water Sierra
Madre
Avenue
Water
Line
reconstruc3on
between
Barranca
Avenue
and
Lone
Hill
and
the
various

feeder
lines
into
the
foothill
popula3on
areas.
 










4,500,000
 60
Glendora CA Water Water
Tank
Emergency
Reservior
at
three
loca3ons 








12,000,000
 155
Hayward CA Airport Skywest
T‐Hangars
‐
Construct
42
new
T‐Hangars 










6,500,000
 120
Hayward CA Airport Runway
Safety
Project
‐
Construc3on
of
the
proposed
depressed
roadway
to
eliminate
poten3al
clearance

conflict
at
end
of
runway. 








34,000,000
 250
Hayward CA Amtrak Tennyson
Road
Grade
Separa3on
Bridge
at
UPRR
to
eliminate
vehicle
and
train
traffic
conflict
and
improve

pedestrian
safety 








13,500,000
 300
Hayward CA CDBG Cannery
Area
Pedestrian
Bridge
‐
This
pedestrian
bridge
over
Union
Pacific
Railroad
will
provide
a
safe
and

direct
access
between
the
residen3al
community
and
Centennial
Park. 










2,500,000
 80
Hayward CA CDBG New
City
Plaza
‐
To
construct
a
new
City
Plaza
in
the
downtown
area
for
community
gatherings. 








12,000,000
 200
Hayward CA CDBG New
Main
Library
‐
Construct
a
new
main
library
to
replace
an
outdated
50‐year
old
exis3ng
facility. 








30,000,000
 300
Hayward CA Energy Traffic
Controllers
‐
Replace
all
150
traffic
controllers
with
new
state
of
the
art
controller
system 










1,500,000
 40
Hayward CA Energy LED
Street
Lights
‐
Replace
street
lights
with
LEDs
Citywide. 










8,000,000
 150
Hayward CA Energy Solar
Energy
Genera3on
for
various
City
Facili3es 










4,000,000
 200
Hayward CA Energy Waste
Water
Treatment
Plant
1MW
Photovoltaic
System 










8,000,000
 200
Hayward CA Public
Safety CAD/RMS
‐
A
new
Computer
Aided
Dispatch/Records
Management
(CAD/RMS)
system
to
support
public
safety

with
police
and
fire
dispatch. 










3,500,000
 40
Hayward CA Public
Safety New
Fire
Sta3on
No.7
‐
Construct
a
new
fire
sta3on
to
replace
an
exis3ng
temporary
facility. 








10,000,000
 100
Hayward CA Public
Safety New
Police
Facility
‐
Construct
a
new
police
facility
to
replace
the
exis3ng
40‐year
old
sta3on. 








75,000,000
 350
Hayward CA Streets/Roads Neighborhood
Streets
Improvements
‐
Improvements
to
include
pavement
reconstruc3on
and
drainage
system

improvements. 








10,000,000
 100
Hayward CA Streets/Roads Pavement
Rehabilita3on
‐
City‐wide
pavement
rehabilita3on,
including
reconstruc3on
of
some
streets 








33,000,000
 350
Hercules CA Amtrak Construct
Capitol
Corridor
Rail
Sta3on
and
Train
Track
Improvements 










6,000,000
 216
Hercules CA CDBG Complete
Bike
Lane
Willow
Ave./State
Route
4
to
San
Pablo
Ave. 














14,808
 1
Hercules CA CDBG Hanna
&
Lupine
Childcare
Playgrounds
‐
Repairs
and
Upgrades 












100,000
 4
Hercules CA CDBG Corpora3on
Yard
Area
Mi3ga3on
and
Future
School
Site
Prep 












280,000
 10
Hercules CA CDBG Repair
Landslide
at
Lupine 










1,500,000
 54
Hercules CA CDBG Construc3on
of
Pedestrian
Access
to
Mass
Transporta3on
Facili3es 










2,636,700
 95
Hercules CA CDBG Historic
Buildings
Rehabilita3on
&
Renova3on 










3,400,000
 129
Hercules CA CDBG Construc3on
and
Renova3on
of
City
Parks 










4,544,250
 164
Hercules CA CDBG Sycamore
Main
Street
Project
Construc3on 








38,940,630
 1402
Hercules CA Energy U3lity
Capital
Projects 










3,273,841
 118
Hercules CA Public
Safety Waterfront
Area
Police
Substa3on 










1,000,000
 36
Hercules CA Schools Rehab
Classroom
at
Ohlone
Childcare
Center 














30,000
 1
Hercules CA Streets/Roads Construct
Busway
for
BART
Parcel
at
New
Town
Center
Project 










2,804,985
 101
Hercules CA Streets/Roads Construct
John
Muir
Parkway
Phase
2
and
Bayfront
Bridge 










3,200,000
 115
Hercules CA Streets/Roads Construct
Roundabout
Willow/Palm 










5,077,422
 173
Hercules CA Streets/Roads Re‐engineer
Freeway
Ramps
@
Willow
Ave./Highway
4 










7,609,600
 259
Hercules CA Streets/Roads Intersec3on
and
Arterial
Improvements 








19,152,807
 651
Hercules CA Transit Bay
Area
Rapid
Transit
(BART)
/
New
Town
Center
Development 








10,437,622
 355
Hercules CA Transit Construct
Transit
Parking
at
Intermodal
Transit
Center 








16,000,000
 576
Hercules CA Water Construc3on,
Expansion,
Maintenance
&
Mi3ga3on
of
Wastewater,
Sewer
and
Flood
Projects 










6,910,243
 322
Hun3ngton
Beach CA CDBG Oakview
Community
Center
Improvements:
permanent
modular
facility
for
YMCA
office
to
offer
outside
and

inside
recrea3ons
programs
at
the
center 












250,000
 10
Hun3ngton
Beach CA CDBG ADA
Improvements:
citywide
ADA
compliant
modifica3ons
to
public
facili3es
such
as
senior
center,
community

centers,
clubhouses,
libraries,
park
and
playground
facili3es 










3,800,000
 40
Hun3ngton
Beach CA CDBG Street
and
alley
maintenance:
pavement
replacement
residen3al
streets
and
alleys
in
CDBG
areas 










4,000,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
Hun3ngton
Beach CA Energy City
&
SCE
owned
Street
&
pole
light
&
purchased
u3lity
meter
inventory,
audit
and
Geographical
Informa3on

System
(GIS)
input. 












150,000
 4
Hun3ngton
Beach CA Energy Retrofit
City
Facili3es
to
allow
par3cipa3on
in
next
genera3on
Demand
Response
Programs.

(create
A/B

circuits
on
ligh3ng
circuits,
install
3meclock
&
controls
on
fountain
pumps,
oil
pumps,
etc.) 










1,000,000
 25
Hun3ngton
Beach CA Energy Hun3ngton
Beach/Goldenwest
College
training
center
of
excellence
for
energy
efficiency
&
renewable
energy,

providing
trained
and
re‐trained
green
collar
workers
(30
qualified/re‐trained
employees
annually) 












500,000
 30
Hun3ngton
Beach CA Energy Replace
high
voltage
downtown
streetlight
system
with
energy
efficient
ligh3ng 










3,500,000
 35
Hun3ngton
Beach CA Energy Phase
2
energy
projects‐retrofit
all
city
owned
and
operated
facili3es
to
achieve
best
in
class
energy
efficiency

performance.
Ligh3ng
systems
redesign
&
retrofit,
HVAC
systems,
controls,
outdoor
security
ligh3ng,
u3lity

infrastructure. 










4,000,000
 50
Hun3ngton
Beach CA Energy Hun3ngton
Beach
Large
Scale
Photovoltaic
purchase.

Install
2.5
MW
of
photovoltaic
systems
across
selected

appropriate
sites
in
the
city. 








15,200,000
 65
Hun3ngton
Beach CA Public
Safety Purchase
Handheld
MDT’s/Ticket
Writers
for
the
foot
beat
officer


 












170,000
 5
Hun3ngton
Beach CA Public
Safety Install
hydraulic
balusters
at
downtown
intersec3ons
for
crowd
protec3on
during
special
events 












500,000
 15
Hun3ngton
Beach CA Streets/Roads Bridge
rehabilita3on‐make
infrastructure
repairs
to
8
local

bridges
that
cross
harbor
water
and
flood
control

channels 










2,500,000
 30
Hun3ngton
Beach CA Streets/Roads Replace
15

miles
of
arterial
block
walls 








10,000,000
 50
Hun3ngton
Beach CA Streets/Roads Arterial
street
and
alley
rehabilita3on‐
improve
local
arterial
and
residen3al
roads 










8,000,000
 80
Hun3ngton
Beach CA Water Upgrade
water
pumping
equipment
by
installing

2
pumps
and
engines.

Result
will
improve
reliability
and
save

energy. 










2,000,000
 20
Hun3ngton
Beach CA Water Install
security
systems
at
water
pumping
and
storage
facili3es,
wastewater
pumping
facili3es,
&
flood
control

pump
sta3ons 










2,500,000
 25
Hun3ngton
Beach CA Water Upgrade
20
flood
sta3on
pumps
and
engines
to
improve
reliability
and
energy
savings. 








10,000,000
 40
Hun3ngton
Beach CA Water Storm
drain
pump
sta3on
construc3on‐
construct
a
higher
capacity
storm
water
pump
sta3on

to
replace
the

exis3ng
undersized
40
+
year
old
sta3on. 










4,500,000
 45
Hun3ngton
Beach CA Water Divert
dry
weather
urban
runoff
from
County
Channel
through
treatment
pools
to
Talbert
Lake. 










2,500,000
 50
Hun3ngton
Beach CA Water Install
Automated
Meter
Reading
capabili3es
(citywide
approximately
50,000
meters)
to
reduce
emissions

from
meter
reading
vehicles 








10,000,000
 50
Hun3ngton
Beach CA Water Sewer
Lib
Sta3on
reconstruc3on
replace
2
40
+
year
old
sewer
lib
sta3ons
with
higher
capacity,
more
energy

efficient
facility
which
will
help
avoid
poten3al
sewer
discharges
into
wetlands
or
ocean 










5,000,000
 50
Indio CA CDBG Indio
Learning
Center.
New
facility
and
City
provided
service
in
conjunc3on
with
City
Library.

 










2,000,000
 75
Indio CA CDBG Indio
Sports
Complex.

Acqua3c
center,
baseball
fields,
soccer
stadium,
and
recrea3onal
ameni3es.










10,000,000
 250
Indio CA CDBG Police,
Fire,
and
Emergency
Opera3ons
Headquarters.
Public
building
expansion
and
service
enhancement.
 








10,000,000
 250
Indio CA Energy Photovoltaic
technology
Senior
Center.
Self
power
genera3ng.
Design
complete. 










1,000,000
 50
Indio CA Streets/Roads Miles
Avenue
between
Madison
and
Clinton
street
capacity
enhancement.
Design
complete. 












225,000
 25
Indio CA Streets/Roads Avenue
46
Pavement
Rehabilita3on.
Madison
Street
to
Monroe
Street.
Design
Complete 










1,200,000
 50
Indio CA Streets/Roads Indio
Boulevard
Bridge
seismic
retrofit
and
moderniza3on.

At
Storm
Channel.

Design
Complete.













1,200,000
 65
Indio CA Streets/Roads Jackson
Street
Bridge
seismic
retrofit
and
moderniza3on.

At
union
Pacific
Railroad.
Design
Complete












1,930,000
 65
Indio CA Streets/Roads Monroe
Street
at
Interstate
10
Traffic
Signals.
Design
Complete. 












900,000
 65
Indio CA Streets/Roads Avenue
42
Widening
from
Clinton
Street
to
Gore
Street
capacity
enhancement
and
storm
drain.
Design

Complete 










5,300,000
 100
Indio CA Streets/Roads Golf
Center
Parkway

pavement
rehabilita3on
and
capacity
enhancement.

Connects
to
Interstate
10.
Design

Complete.











3,000,000
 100
Indio CA Streets/Roads Madison
Street
at
Indio
Boulevard
to
Avenue
50
widening,
pavement
reconstruc3on
and
u3lity
reloca3on.

Design
complete 










4,100,000
 100
Indio CA Streets/Roads Monroe
Street
at
Avenue
49
to
Avenue
52
widening
,
pavement
reconstruc3on,
and
u3lity
reloca3on.
Design

complete.












2,500,000
 100
Indio CA Streets/Roads Monroe
Street
to
Interstate
10
Pavement
Reconstruc3on.
 










6,800,000
 100
Indio CA Streets/Roads Varner
Road
at
Jefferson
Street
capacity
enhancement
and
paving. 










3,200,000
 100
Indio CA Streets/Roads 19
Traffic
Signal
Moderniza3on
Projects 










5,500,000
 200
Indio CA Transit The
Indio
Transporta3on
Center‐‐first
regional
mul3modal
facility
for
train,
bus,
and
auto
uses. 










2,000,000
 50
Indio CA Transit Union
Pacific
Railroad
Spur
Capacity
Enhancement.

Rail
enhancements
to
allow
for
increased
Amtrak

Passenger
rail
service
and
to
facilitate
goods
movement.
 










1,500,000
 50
Indio CA Water Royal
Dornoch
Drive
Pipeline
capacity
expansion.

Installa3on
of
new
pipeline
to
increase
water
capacity.
 














98,000
 45
Indio CA Water Showcase
East
Pipeline.

Capacity
expansion
and
new
line
installa3on.

Design
Complete.
 












150,000
 45
Indio CA Water Polyethylene
Water
Service
Replacement
Program.
Rehabilita3on. 












500,000
 50
Indio CA Water Water
Well
1D
rehabilita3on
and
expansion.
Design
complete. 












900,000
 50
Indio CA Water Water
Well
1E
rehabilita3on
and
expansion.
Design
complete.















900,000
 50
Indio CA Water Avenue
44
and
White
Water
Storm
Channel
Drain
enhancement.

 










1,500,000
 75
Indio CA Water Avenue
48
and
Dillon
Road
Storm
Drain
capacity
enhancement.

 










1,000,000
 75
Indio CA Water Hydrant
Replacement
Program

for
aging
hydrants
in
disrepair.
Design
complete. 










4,350,000
 75
Indio CA Water Miles
Road
Bridge
Pipeline.

Capacity
expansion.
Design
complete.















516,500
 75
Indio CA Water Water
Well
13A
rehabilita3on
and
expansion.

Granite
Hills
reservoir.
Design
complete. 










1,600,000
 75
Indio CA Water Water
Well
2E
rehabilita3on
and
expansion.

On
highway
111.
Design
complete. 










1,920,000
 75
Indio CA Water Water
Plant
3‐
2.5
Million
Gallon
Reservoir,
capacity
expansion.
 










3,120,000
 100
City State Program Project
Descrip3on Funding
Required Jobs
Indio CA Water Lost
Horse
Water
Reservoir
Project
Capacity
Expansion. 








10,000,000
 150
Inglewood CA Airport The
Noise
Mi3ga3on
Recycling
Program:
This
program
has
an
es3mated
funding
of
$25,000,000.

At
least
four

consultants
will
include
acquisi3on,
reloca3on,
abatement
and
demoli3on.

Addi3onally,
three
staff
person
will

be
required
for
program
implementa3on 








25,000,000
 15
Inglewood CA Airport RSI
Demonstra3on
Home:
This
idea
assumes
addi3onal
staff
and
another
consultant
for
construc3on

management
as
indicated
above.

Addi3onal
personnel
would
trigger
physical
constraints
within
the

department
and
demand
for
office
space.
 












750,000
 25
Inglewood CA Airport Residen3al
Sound
Insula3on
in
accordance
with
the
City’s
adopted
Aircrab
Noise
Mi3ga3on
Program:
The
City
 








65,000,000
 866
Inglewood CA CDBG Park
Rangers:
Federal
funding
will
provide
for
park
rangers
to
enforce
park
rules
and
regula3ons,
unlock
and
 












275,000
 6
Inglewood CA CDBG City's
Weed
and
Graffi3
Abatement
Program:

This
program
will
provide
employment
opportuni3es
for
at
least
 










1,000,000
 8
Inglewood CA CDBG Public
Service
Employees
(PSE)
Program:
The
City
of
Inglewood
is
currently
experiencing
staff
shortages
in
 












661,000
 15
Inglewood CA CDBG Park
Improvements

‐
Federal
funding
will
provide
for
the
installa3on
of
ar3ficial
surfaces
on
soccer
fields
at
 










1,500,000
 30
Inglewood CA CDBG Rogers
Park
Improvement
Project:

This
project
will
provide
for
park
improvements
including
the
roof,
HVAC
 










1,000,000
 40
Inglewood CA CDBG Solar
Housing
Energy
Program:
This
project
installs
solar
energy
systems
in
homes
for
very
low‐income
senior
 










1,080,000
 120
Inglewood CA CDBG The
Inglewood
Youth
Employment
and
Training
Program:
This
program
will
be
targeted
to
youth
between
the
 










1,000,000
 120
Inglewood CA CDBG Inglewood
CARE
Program:
The
Commercial
Area
Revitaliza3on
Effort
(CARE)
is
a
comprehensive
program
 










3,000,000
 150
Inglewood CA Energy Parks
Energy
Enhancements:
This
project
will
provide
new
electrical
panels,
conduits,
transformers
and
needed
 












430,000
 5
Inglewood CA Energy Civic
Building
Alterna3ve
Energy
Renova3ons:
This
project
includes
energy
renova3ons
for
City
Hall,
Main
City
 










5,000,000
 100
Inglewood CA Public
Safety In‐Car
Cameras
–
The
Police
Department
needs
to
replace
an
obsolete
in‐car
camera
video
system
in
its
first
 












672,000

Inglewood CA Public
Safety Interoperable
Radio
System
and
Data
Communica3ons
System
–
the
Police
Department
needs
to
replace
an
un‐ 










3,000,000

Inglewood CA Public
Safety Public
Video
Monitoring
–
The
Police
Department
needs
to
acquire
a
remote
camera
system
sufficient
to
cover
 










1,000,000

Inglewood CA Public
Safety Shotspofer
System
–
The
Police
Department
needs
to
improve
its
inves3ga3ve
capabili3es
by
using
technology
 










1,200,000

Inglewood CA Public
Safety Police
Auto
Mechanics
–
The
Police
Department
needs
dedicated
general
auto
mechanics
to
ouzit
and
 












255,000
 3
Inglewood CA Public
Safety Homeless
Interven3onist
–
The
Police
Department
needs
a
staff
of
trained
mental
health
professionals
and
 












430,000
 4
Inglewood CA Public
Safety Informa3on
Technology
Technicians
–
The
current
use
of
equipment
and
planned
procurements
of
 












400,000
 4
Inglewood CA Public
Safety Forensic
Personnel
–
The
Police
Department
needs
an
addi3onal
5
forensic
specialist
to
provide
adequate
18‐ 












750,000
 5
Inglewood CA Public
Safety Custody
Officers
–
The
Police
Department
needs
an
addi3onal
6
(1
supervisor
+
5
custody
officers)
custody
 












430,000
 6
Inglewood CA Public
Safety Parks
Safety
Program:Federal
funding
will
provide
for
the
installa3on
of
security
surveillance
and
Hirsch
access
 












400,000
 8
Inglewood CA Public
Safety Community
Service
Officer
(CSO)
–
A
non‐sworn
posi3on
assigned
to
complete
no‐lead
burglary
inves3ga3ons,

other
non‐violent
misdemeanor
property
crime
inves3ga3ons,
and
minor
traffic
collision
inves3ga3ons.
 












918,000
 14
Inglewood CA Public
Safety Police
Officer
and
Part‐3me
Inves3gators
–
The
Police
Department
needs
to
increase
police
officer
staffing
by

30
posi3ons.

These
addi3onal
police
officers
will
be
deployed
within
our
redeveloping
concentrated
business

districts 










5,800,000
 30
Inglewood CA Streets/Roads City‐wide
Street
Resurfacing
program
‐
This
is
a
street
resurfacing
program
of
street
pavement
and
adjacent
 










7,600,000
 40
Inglewood CA Streets/Roads City‐wide
Sidewalk
replacement
and
Pedestrian
Ramp
program
‐This
is
a
sidewalk
replacement
and
pedestrian
 










2,500,000
 50
Inglewood CA Streets/Roads City‐wide
Alleyway
replacement
program
‐
This
is
a
alleyway
replacement
program
to
replace
aged

infrastructure. 










3,750,000
 60
Inglewood CA Streets/Roads La
Brea
Avenue
Pavement
Reconstruc3on,
Ph.2
‐
Project
provides
for
full
pavement
reconstruc3on
of
major
80

year
old
thoroughfare
and
improves
driving
characteris3cs
with
intelligent
transporta3on
system

enhancements. 










7,440,000
 60
Inglewood CA Transit Asphalt
Zipper
‐
Equipment
to
improve
street
longevity/reliability
by
enhancing
roadway
maintenance
&
repair

opera3ons. 












120,000
 4
Inglewood CA Water Fluorida3on
treatment
facility
‐
Project
provides
for
fluorida3on
of
pumped
groundwater
to
match
fluoridated

imported
water
supply
and
enhance
water
quality. 










1,500,000
 40
Inglewood CA Water Water
Treatment
Plant
Expansion
‐
Project
expands
current
capacity
of
8.3
MGD
to
12
MGD
to
provide
ability
to
pump/produce/treat
more

groundwater
and
reduce
dependence
upon
imported
water
supply.

Project
also
replaces
current
use
of

chlorine
gas
 










2,300,000
 40
Inglewood CA Water This
project
will
upgrade
the
irriga3on
systems
at
various
City
Parks.

Most
have
exceeded
their
life
expectancy.


The
average
age
of
the
irriga3on
systems
at
the
park
sites
is
25
years;
many
are
over
30
years
old
resul3ng
in

frequent
main
breaks
and
l 










5,000,000
 50
Irvine CA Energy Solar
Contractural
Assessment
Program
(California
Assembly
Bill
811) 












500,000
 3
Irvine CA Energy Convert
I‐Shufle
buses
to
natural
gas
or
hydrogen 










2,000,000
 4
Irvine CA Streets/Roads Red
Hill
Rehabilita3on 










4,000,000
 30
Irvine CA Streets/Roads Laguna
Canyon/HWY
405
Widening 










9,500,000
 75
La
Mesa CA Streets/Roads El
Cajon
Blvd.
&
La
Mesa
Blvd.
Intersec3on
Improvements 












300,000
 5
La
Mesa CA Streets/Roads Spring
Street
Trolley
Intersec3on
Improvements 












200,000
 5
La
Mesa CA Streets/Roads 2008
Street
Improvements 












750,000
 7
La
Mesa CA Streets/Roads Bal3more
Drive
Improvements 










2,250,000
 10
Lakewood CA CDBG Fire
alarm
system
upgrade
and
new
installa3on
on
city
buildings
(Palms) 














50,000
 10
Lakewood CA CDBG Security
camera
installa3on
on
city
buildings
(Burns,
Palms) 














75,000
 10
Lakewood CA CDBG Roof
replacement
‐
Burns
Center 












109,200
 15
Lakewood CA CDBG Parking
lot
replacement
‐
Burns
Center
(45,000
sf) 












135,000
 20
Lakewood CA CDBG Overlay
Streets,
Area
44,
and
repair
hardscape 












500,000
 25
Lakewood CA CDBG Overlay
Streets,
Area
48,
and
repair
hardscape 












300,000
 25
Lakewood CA CDBG Solar
panel
installa3on
on
five
city
buildings 










3,437,500
 25
Lakewood CA Streets/Roads Overlay
West
Service
Road,
Lakewood
Blvd
between
Candlewood
St
and
Del
Amo
blvd 












200,000
 15
Lakewood CA Streets/Roads Landscape
median
improvements
on
Del
Amo
Blvd.
between
Allred
St.
and
Hayter
Ave. 












550,000
 20
Lakewood CA Streets/Roads Overlay
Residen3al
Streets,
Area
21,
and
repair
hardscape 










1,300,000
 25
Lakewood CA Streets/Roads Overlay
Residen3al
Streets,
Area
22,
and
repair
hardscape 










1,500,000
 25
Lakewood CA Streets/Roads Overlay
Residen3al
Streets,
Area
42,
and
repair
hardscape 












700,000
 25
Lakewood CA Streets/Roads Overlay
Residen3al
Streets,
Area
45,
and
repair
hardscape 












370,000
 25
Lakewood CA Water Sewer
containment
and
capacity
upgrade
‐
sewer
mains
that
were
iden3fied
as
deficient
in
the
City's
Sewer

Master
Plan
will
be
replaced
or
augmented
with
larger
pipes 










1,700,000
 15
Lakewood CA Water Installa3on
of
a
Treatment
Plant
for
the
removal
of
manganese
and
hydrogen
sulfide
from
Drinking
Water
Well
 










2,200,000
 30
Livermore CA Airport Replacement
of
fire
equipment
to
meet
current
standards 












750,000
 3
Livermore CA Airport Airport
terminal
upgrades
for
energy
efficiency,
ADA
accessibility
and
public
safety 










4,000,000
 17
Livermore CA CDBG Downtown
Redevelopment
Incen3ve
Program
(Reloca3on
assistance,
Marke3ng,
Façade
Imp.) 












275,000
 2
City State Program Project
Descrip3on Funding
Required Jobs
Livermore CA CDBG Renovate
old
church
for
homeless
drop‐in
center
(first
center
in
area) 












150,000
 3
Livermore CA CDBG Renovate
historic
farm
for
use
by
Hoofprint’s
on
the
Heart,
an
adap3ve
riding
facility
for
disabled
adults
and
 










1,600,000
 7
Livermore CA CDBG Renovate
closed
school
for
Friendship
Center,
Adult
Day
Care
Facility
for
seniors
with
Alzheimer’s
and
 










1,000,000
 12
Livermore CA CDBG Redevelopment
Area
Infrastructure
Enhancements
(electrical
service
upgrades,
storm,
sewer,
and
parking) 










7,000,000
 29
Livermore CA Energy Implement
energy
efficiency
retrofit
in
City’s
Mul3‐Service
Center
(Ten
tenants
provide
services
to
over
10,000

low
income
residents
per
year) 












200,000
 2
Livermore CA Energy Citywide
landscape
improvements
to
improve
water
conserva3on
and
solar
heat
island
abatement 










1,000,000
 4
Livermore CA Energy Alterna3ve
energy
efficiency
grants
for
business
and
workforce
housing 










1,500,000
 7
Livermore CA Energy Convert
exis3ng
street
lights
and
Internally
Illuminated
Street
Name
Signs
to
LED
for
energy
savings 








12,290,000
 52
Livermore CA Housing Leahy
Square
Housing
Moderniza3on
Program,

including
water
conserva3on
and
energy
efficiency 










3,125,000
 50
Livermore CA Public
Safety Construct
Council
Chambers/Emergency
Opera3ons
Center 








12,300,000

Livermore CA Public
Safety Construct
Fire
Sta3on
No.
9 










5,000,000

Livermore CA Public
Safety Downtown
Redevelopment
Area
Officers 












250,000
 2
Livermore CA Public
Safety School
Police
Office
Program 












250,000
 2
Livermore CA Public
Safety East
Bay
Regional
Communica3on
System
–
Inter
Operable
Radio
System 










1,500,000
 7
Livermore CA Public
Safety Public
Safety
Surveillance
Equipment
(Parking
garages,
City
facili3es
and
grounds,
and
public
high
crime
areas) 










1,500,000
 7
Livermore CA Streets/Roads Annual
2009
Slurry
Sealing
of
various
City
Streets 










2,000,000
 6
Livermore CA Streets/Roads Regional
Trails
System
Upgrades
–
Increase
non‐auto
oriented
travel 










1,500,000
 7
Livermore CA Streets/Roads Reconstruct
Lizzie
Fountain
and
rehabilitate
site
improvements
and
furnishings
in
the
fountain
plaza 












500,000
 8
Livermore CA Streets/Roads Replace
sidewalks
City‐wide
to
meet
ADA
compliance 










1,500,000
 8
Livermore CA Streets/Roads Annual
2009
Street
Resurfacing
of
various
City
Streets 










2,500,000
 10
Livermore CA Streets/Roads Construct
new
Vasco
Rd.
ACE
Train
Parking
Lots
Connector
Road 












800,000
 10
Livermore CA Streets/Roads Pavement
rehabilita3on
of
Portola
Avenue
from
N.
Livermore
Ave.
to
Edinburgh
Dr. 












700,000
 10
Livermore CA Streets/Roads Pavement
rehabilita3on
of
various
federal‐aid
arterial
streets
in
City
of
Livermore 










2,400,000
 10
Livermore CA Streets/Roads Construct
new
auxiliary
lanes
on
WB
I‐580
at
Vasco
Rd.,
First
St.,
and
Fallon
Rd.
Interchanges 










2,500,000
 11
Livermore CA Streets/Roads Construct
new
Caltrans
Park
&
Ride
Parking
Lot
along
Kify
Hawk
Rd. 












500,000
 12
Livermore CA Streets/Roads Realign
East
Vineyard
to
remove
curves
and
provide
signaliza3on
at
Vallecitos
Road 










2,000,000
 12
Livermore CA Streets/Roads Pavement
rehabilita3on
for
First
St.,
Holmes
St.
and
Vallecitos
Rd.
along
former
State
Route
84 










3,100,000
 15
Livermore CA Streets/Roads Build
Iron
Horse
Trail
in
Downtown
Redevelopment
Area
and
near
transit
center 










5,000,000
 22
Livermore CA Streets/Roads Extend
W.
Jack
London
Boulevard
from
west
of
SR
84
to
El
Charro
Road.I‐580 










9,700,000
 40
Livermore CA Transit Access‐to‐transit
improvements,
incl.
sidewalk
gap
closures,
ADA
compliance
upgrades
and
new
shelters
at

exis3ng
bus
stops
in
City
of
Livermore













500,000
 2
Livermore CA Water Construct
new
Water
Reclama3on
Plant
Laboratory,
Office
and
Shop
Building 










6,500,000

Livermore CA Water El
Charro
Regional
flood
control
improvements










12,000,000

Livermore CA Water El
Charro
Specific
Plan
Potable
Water
System












1,400,000

Livermore CA Water El
Charro
Specific
Plan
Recycled
Water
System 












715,000

Livermore CA Water El
Charro
Specific
Plan
Sewer
Pump
Sta3on/Force
Main
and
sewer
infrastructure 










1,800,000

Livermore CA Water Re‐line
and
replace
a
sec3on
of
industrial
sewer
trunkline
between
Union
Pacific
Railroad
track
between
North

Mines
Rd.
and
Junc3on
Ave. 










2,200,000

Livermore CA Water Relocate
and
construct
new
Springtown
Pump
Sta3on 










2,250,000

Livermore CA Water Replace
sanitary
sewer
lines
at
various
loca3ons
city‐wide 










1,500,000

Livermore CA Water Replace
various
sewer
mainline
boflenecks
city‐wide 










2,600,000

Livermore CA Water Alterna3ve
energy
produc3on
facility
for
WWTP 












750,000
 3
Livermore CA Water Water
transmission
(incl.
recycled
water)
and
sanitary
sewer
improvements 










1,100,000
 6
Livermore CA Water Expanded
recycled
water
program 










5,000,000
 21
Livermore CA Water Water
Reclama3on
Plant
Process
Improvements 










8,000,000
 35
Lodi CA Streets/Roads Lodi
Avenue
Reconstruc3on
and
Smart
Growth
Incen3ves
Project 










1,000,000
 10
Lodi CA Streets/Roads Miscellaneous
Streets
Overlay
Projects 










1,000,000
 10
Lodi CA Streets/Roads Lockeford
Street
Widening
Project 










1,700,000
 15
Lodi CA Streets/Roads Harney
Lane
Widening
Project












2,500,000
 20
Lodi CA Transit Transit
Maintenance
Shop
Solar
Power
Project 












800,000
 6
Lodi CA Water Wastewater
Pipe
Lining
Project 










2,000,000
 10
Lodi CA Water Water
Main
Replacement
Project 










2,000,000
 20
Lodi CA Water Groundwater
Resource
Preserva3on
Project 










2,500,000
 25
Lodi CA Water Lodi
Lake
Surface
Water
Treatment
Plant
and
Transmission
Project 










3,000,000
 40
Long
Beach CA Airport Long
Beach
Airport
Solar
Powered
Parking
Structure
Project—Includes
a
new
3,200
space
parking
structure,
 








85,000,000
 1000
Long
Beach CA CDBG Non
Profit
Assistance—Provide
zero
percent
interest
loans
ranging
from
$5,000
to
$70,000
for
facility
 












700,000
 20
Long
Beach CA CDBG Business
Districts
Signage
Program—S3mulus
funding
will
be
used
to
develop
and
implement
a
comprehensive
 










1,500,000
 35
Long
Beach CA CDBG Energy
Efficient
Homes—Implement
an
Energy
Efficient
Homes
program,
using
the
current
CDBG‐funded
Home
 










1,500,000
 43
Long
Beach CA CDBG Neighborhood
Sidewalk
Replacement
&
Improvement
Project—Funds
will
be
used
to
aggressively
expand
this
 










1,000,000
 50
Long
Beach CA CDBG Summer
Sidewalk
Improvement
Project—This
program
would
provide
area
youth
with
the
opportunity
to
 












200,000
 50
Long
Beach CA CDBG Extensive
Façade
Improvement
Project—Area
architects
and
contractors
would
be
selected
via
the
Request
for
 










1,500,000
 86
Long
Beach CA CDBG Park
and
Open
Space
Improvement
Project—CDBG
currently
funds
a
$25
million
bond
for
park
and
open
space
 










6,000,000
 172
Long
Beach CA CDBG Mural
Projects
on
Local
Public
&
Private
Facili3es—The
Economic
Development
Bureau,
in
conjunc3on
with
 










3,000,000
 175
Long
Beach CA Energy Incen3ves/Grants
for
Solar
Installa3ons—Incen3ves/grants
to
developers
and
residents
to
incorporate
solar
 










2,000,000
 13
Long
Beach CA Energy Tree
Plan3ng—The
City
will
implement
a
tree
plan3ng
program
that
will
decrease
the
urban
heat
island
effect
 








19,000,000
 28
Long
Beach CA Energy LED
Street
Ligh3ng
Enhancement
Program—Convert
standard
street
lights
in
residen3al
and
commercial
areas
 










3,000,000
 50
Long
Beach CA Energy Alterna3ve
Fuels—Invest
in
and
promote
the
use
of
alterna3ve
fuels
among
residents
and
businesses,
and
 








40,000,000
 56
Long
Beach CA Energy Energy
Retrofits
for
Municipal
Buildings—Increase
energy
efficiency
and
reduce
costs
to
the
City
by
retrofiqng
 








90,000,000
 105
City State Program Project
Descrip3on Funding
Required Jobs
Long
Beach CA Public
Safety Forensic
Inves3ga3on
Equipment—Acquire
the
necessary
equipment
for
controlled
substance,
firearms,
 












779,000

Long
Beach CA Public
Safety Front
Line
Law
Enforcement
Over3me—Addi3onal
funding
would
allow
the
Long
Beach
Police
Department
to
 










1,000,000

Long
Beach CA Public
Safety Mobile
Radio
Equipment—Addi3onal
funding
would
allow
the
LBPD
to
procure
and
install
330
new
mobile
 










1,500,000

Long
Beach CA Streets/Roads Studebaker
and
7th
Street
Improvement
Project—Implement
significant
landscaping
improvements
and
traffic
 










1,000,000
 13
Long
Beach CA Streets/Roads Long
Beach
Bicycle
Boulevard
Connec3ons—Construct
4
bicycle
boulevards
to
begin
a
citywide
network
that
 










5,000,000
 63
Long
Beach CA Streets/Roads Citywide
Street
Resurfacing
&
Rehabilita3on
Project—Resurfacing
and
rehabilita3ng
approximately
24
streets
 








30,537,559
 382
Long
Beach CA Water Cast
Iron
Water
Main
Replacement—This
project
would
replace
old
cast
iron
water
mains
that
have
reached
 










6,660,000

Long
Beach CA Water Recycled
Water
Facility
Improvements—This
project
would
expand
the
Long
Beach
Water
Department’s
 










1,950,000

Long
Beach CA Water Sewer
System
Improvements—This
project
would
undertake
major
sewer
system
rehabilita3on
at
the
 










2,392,000

Long
Beach CA Water Water
Conserva3on
in
Public
Landscapes—Implement
irriga3on
infrastructure
upgrades
citywide
with
water
 








50,000,000

Long
Beach CA Water Water
Distribu3on
System
Improvements—This
project
involves
undertaking
needed
repairs
and
maintenance
 










1,600,000

Long
Beach CA Water Water
Resources
Facility
Improvements—Replace
the
gaseous
Chlorine
storage
facility
and
related
transport
 










3,515,000

Long
Beach CA Water Installa3on
of
Treatment
Devices
for
5
Ouzalls—Install
end‐of‐pipe
structural
best
management
devices
at
5
of
 












500,000
 29
Long
Beach CA Water Storm
Drain
Replacement
Program—The
Long
Beach
Public
Works
Department
will
replace
28.1
miles
of
 






111,400,000
 38
Long
Beach CA Water Catch
Basin
Best
Management
Prac3ces
Program—Install
a
debris
excluder
at
the
mouth
of
inlets
with
a
filter
 










8,000,000
 101
Long
Beach CA Water Upgrading
23
City‐Owned
Pump
Sta3ons—Upgrade
the
23
city‐owned
pump
sta3ons
with
low‐flow
diversion
 








17,250,000
 174
Los
Angeles CA Airport LAX
Airport
Opera3ons
Center
(AOC)
and
Department
Opera3ons
Center
(DOC) 








10,000,000
 58
Los
Angeles CA Airport Passenger
Boarding
Bridges 








17,500,000
 204
Los
Angeles CA Airport Perimeter
Security
Fence 








56,250,000
 433
Los
Angeles CA Airport North
Airfield
Improvements 






112,500,000
 869
Los
Angeles CA Airport Ver3cal
Conveyance 






125,000,000
 1445
Los
Angeles CA Airport Crossfield
Taxiway 






187,500,000
 1446
Los
Angeles CA Airport Exis3ng
Terminal
Improvements 






150,000,000
 1726
Los
Angeles CA CDBG Business
District
Pedestrian
and
Median
Improvements 










1,000,000
 6
Los
Angeles CA CDBG Lemon
Grove
Ligh3ng
Improvements
‐
New
Streetlights 










1,000,000
 6
Los
Angeles CA CDBG West
Adams
Ligh3ng
Improvements
1B‐New
Streetlights 












900,000
 6
Los
Angeles CA CDBG Santa
Monica
and
Heliotrope
Ligh3ng
Improvements
‐

New
streetlights 










1,350,000
 9
Los
Angeles CA CDBG Maya
Townhomes 












730,000
 52
Los
Angeles CA CDBG My
Townhomes 












918,000
 52
Los
Angeles CA CDBG Mediterranean
Apts. 












719,000
 56
Los
Angeles CA CDBG PH&D
Apts. 










1,336,000
 85
Los
Angeles CA CDBG Swansea
Senior 










1,539,000
 112
Los
Angeles CA CDBG Hollywood
Bungalow
Courts 












390,000
 118
Los
Angeles CA CDBG Bonnie
Brae
Apt.
Homes 










2,069,000
 137
Los
Angeles CA CDBG Menlo
Park 










3,677,000
 138
Los
Angeles CA CDBG Three
Courtyards 










1,953,000
 139
Los
Angeles CA CDBG Berth
145‐147
Wharf
Reconstruc3on 








12,500,000
 145
Los
Angeles CA CDBG Renato 










2,449,000
 145
Los
Angeles CA CDBG Broadway
Pedestrian
Improvements 








13,500,000
 166
Los
Angeles CA CDBG Andalucia
Senior 










2,371,000
 178
Los
Angeles CA CDBG Bonnie
Brae
Village 










1,115,000
 190
Los
Angeles CA CDBG New
Genesis 










1,885,000
 196
Los
Angeles CA CDBG Miramar
Village 










3,880,000
 229
Los
Angeles CA CDBG MacArthur
Park
Metro
A
&
B 










9,500,000
 428
Los
Angeles CA CDBG Taylor
Yard
Transit
Village 








17,000,000
 1046
Los
Angeles CA Energy South
Hall
Cooling
Tower
Replacement 












300,000
 2
Los
Angeles CA Energy Colortran
Dimming
System 












700,000
 4
Los
Angeles CA Energy LA
River
Bikeway
Solar/LED
Retrofit 












800,000
 6
Los
Angeles CA Energy Westchester‐Playa
del
Rey
Street
Ligh3ng
Energy
Retrofit 












779,240
 6
Los
Angeles CA Energy Energy
Efficiency/Green
Programs 










1,250,000
 7
Los
Angeles CA Energy Sherman
Oaks‐Studio
City‐Toluca
Lake
Street
Ligh3ng
Energy
Retrofit 












877,800
 7
Los
Angeles CA Energy Studio
City
Street
Ligh3ng
Energy
Retrofit 












904,750
 7
Los
Angeles CA Energy West
Los
Angeles
Unit
III
Street
Ligh3ng
Energy
Retrofit 












842,850
 7
Los
Angeles CA Energy Canoga
Park
West
Unit
II
Street
Ligh3ng
Energy
Retrofit 










1,129,800
 9
Los
Angeles CA Energy Chiller
Replacement 










1,500,000
 9
Los
Angeles CA Energy Main
Channel
Deepening/Dredging 












850,000
 9
Los
Angeles CA Energy Los
Feliz‐Hollywood
Street
Ligh3ng
Energy
Retrofit 










1,609,300
 13
Los
Angeles CA Energy Reseda‐West
Van
Nuys
Street
Ligh3ng
Energy
Retrofit 










1,566,600
 13
Los
Angeles CA Energy Greater
Wilshire
Street
Ligh3ng
Energy
Retrofit 










1,651,650
 14
Los
Angeles CA Energy Palms‐Del
Rey‐Mar
Vista
Unit
II
Street
Ligh3ng
Energy
Retrofit 










1,705,200
 14
Los
Angeles CA Energy Palms‐Del
Rey‐Mar
Vista
Street
Ligh3ng
Energy
Retrofit 










1,848,000
 15
Los
Angeles CA Energy Brentwood
Street
Ligh3ng
Energy
Retrofit 










2,100,000
 17
Los
Angeles CA Energy North
Central
LNG
Facility 










4,500,000
 52
Los
Angeles CA Energy Low
Income
Refrigerator
Exchange
(LIREP):
 










4,000,000
 58
Los
Angeles CA Energy Small
Business
Direct
Install
(SBDI):
 










4,000,000
 58
Los
Angeles CA Energy LED
Ligh3ng
Retrofits
‐
Retrofit
of
exis3ng
lights
 










6,000,000
 59
Los
Angeles CA Energy Harbor
Clean
Fuel
Facility 








10,000,000
 115
Los
Angeles CA Energy City
Irriga3on
Retro‐fit
Program
(500
acres) 








55,000,000
 347
Los
Angeles CA Energy Energy
conserva3on
(demand
management) 






196,666,667
 1427
Los
Angeles CA Energy Renewable
Energy 






213,333,333
 1620
Los
Angeles CA Energy Port
of
LA
Green
Jobs/CAAP
(CTP,
AMP,
Clean
Tech) 






500,000,000
 12993
Los
Angeles CA Energy Solar
LA
Program 




2,160,000,000
 31243
Los
Angeles CA Housing Soil
remedia3on
and
lead
abatement 














92,949
 0.538
Los
Angeles CA Housing Trailer
demoli3on 












179,000
 1.036
Los
Angeles CA Housing Mildew
abatement 












440,000
 2.546
Los
Angeles CA Housing Repair
fire
damage
units 












652,000
 3.772
Los
Angeles CA Housing Jordan
Downs
Remedia3on 










1,500,000
 8.679
Los
Angeles CA Housing Security
bars
and
doors 










2,500,000
 14.46
City State Program Project
Descrip3on Funding
Required Jobs
Los
Angeles CA Housing Repair
water
damaged
units 










2,646,200
 15.31
Los
Angeles CA Housing Playground
repair
and
upgrade 










5,000,000
 28.93
Los
Angeles CA Housing Landscaping
 










8,100,000
 46.86
Los
Angeles CA Housing Concrete
and
paving
work 










9,135,304
 52.85
Los
Angeles CA Housing Reroofing
of
public
housing
buildings 










9,616,000
 55.64
Los
Angeles CA Housing U3li3es
upgrades
and
energy
conserva3on 








14,166,000
 81.96
Los
Angeles CA Housing 504/VCA
Reasonable
Accommoda3on
 








18,851,077
 109.1
Los
Angeles CA Housing Asbestos
abatement
and
floor
replacement 








26,500,000
 153.3
Los
Angeles CA Housing Carpentry
work
throughout
the
developments 








30,084,500
 174.1
Los
Angeles CA Housing Security
cameras
and
lights 








35,000,000
 202.5
Los
Angeles CA Housing Pain3ng
of
public
housing
sites 








36,240,000
 209.7
Los
Angeles CA PublicSafety Red
Line
7th/Metro
Sta3on
Capacity
and
Safety
Improvements 










2,000,000
 12
Los
Angeles CA Schools RWGPL
‐
West
Parking
Lot 















7,830
 0.056
Los
Angeles CA Schools Astronomy
Building 














11,889
 0.086
Los
Angeles CA Schools Campus‐Wide
Infrastructure
‐
Smart
Classrooms
(SCR) 














28,160
 0.203
Los
Angeles CA Schools Temporary
Facili3es
‐
Food
Services 














50,556
 0.364
Los
Angeles CA Schools WALL
SYSTEMS_BURROUGHS
MS 














60,918
 0.694
Los
Angeles CA Schools SHEET
METAL
/
FENCING_LOS
ANGELES
SH 














68,198
 0.81
Los
Angeles CA Schools Temporary
Facili3es
‐
Temporary
Trailer
for
Overflow 












128,065
 0.922
Los
Angeles CA Schools Learning
Resource
Center
‐
Space
Hea3ng
System 












149,200
 1.075
Los
Angeles CA Schools Math
and
Science
Building
‐
Space
Hea3ng
System 












208,605
 1.502
Los
Angeles CA Schools FHWA‐Brahma
Drive 












240,000
 1.729
Los
Angeles CA Schools Campus
Improvements
‐
Central
Quad
Improvements 












249,133
 1.794
Los
Angeles CA Schools College
Kiosks
Renova3on 












264,000
 1.901
Los
Angeles CA Schools San
Fernando
Road
Street
Widening 












320,000
 2.305
Los
Angeles CA Schools HVAC_BRIGHT
EL 












212,856
 2.488
Los
Angeles CA Schools Liberal
Arts
‐
Replace
Theater
Pneuma3c
Controls 












347,139
 2.5
Los
Angeles CA Schools HVAC_BELMONT
SH 












237,094
 2.719
Los
Angeles CA Schools Science
Building 












400,325
 2.883
Los
Angeles CA Schools RWGPL
‐
Campus
Fire
Access
Plan
‐
I 












452,800
 3.261
Los
Angeles CA Schools HVAC_MARK
TWAIN
MS 












286,582
 3.298
Los
Angeles CA Schools DSA
ACCESS
COMPLIANCE_BERENDO
MS 












289,960
 3.356
Los
Angeles CA Schools DSA
ACCESS
COMPLIANCE_LANTERMAN
HS 












288,528
 3.356
Los
Angeles CA Schools FLOOR
COVERINGS_PACOIMA
EEC 












289,600
 3.356
Los
Angeles CA Schools DSA
ACCESS
COMPLIANCE_KENTER
CANYON
EL 












292,972
 3.414
Los
Angeles CA Schools MODERNIZATIONS_75TH
STREET
EEC 












296,100
 3.414
Los
Angeles CA Schools Heat
Genera3ng
Syst_VAN
NUYS
EL 












302,424
 3.471
Los
Angeles CA Schools LUNCH
SHELTERS_28TH
STREET
EEC 












300,000
 3.471
Los
Angeles CA Schools LUNCH
SHELTERS_MARINA
EEC 












300,000
 3.471
Los
Angeles CA Schools LUNCH
SHELTERS_MIKES
EEC 












300,000
 3.471
Los
Angeles CA Schools MODERNIZATIONS_HADDON
EEC 












300,000
 3.471
Los
Angeles CA Schools INSTALL
PLYGRND
EQ.
&
MAT_BALDWIN
HILLS
EL 












302,798
 3.529
Los
Angeles CA Schools PLUMBING
/
IRRIGATION_LAUREL
EEC 












316,600
 3.645
Los
Angeles CA Schools ROOFING_VAN
NUYS
SH 












317,000
 3.645
Los
Angeles CA Schools RWGPL
‐
Landscaping
Central
Walk
and
North
Quad 












515,461
 3.713
Los
Angeles CA Schools Campus
Improvements
‐
Execu3ve
Corridor
Improvements 












520,000
 3.745
Los
Angeles CA Schools MODERNIZATIONS_TRINITY
EEC 












326,200
 3.761
Los
Angeles CA Schools DSA
ACCESS
COMPLIANCE_SAN
PEDRO
SH 












340,972
 3.934
Los
Angeles CA Schools MODERNIZATIONS_EL
SERENO
EEC 












346,200
 3.992
Los
Angeles CA Schools Site
development_LOS
ANGELES
EL 












349,603
 4.05
Los
Angeles CA Schools paint
exterior_LOS
FELIZ
EL 












353,819
 4.108
Los
Angeles CA Schools Floor
Coverings_MCBRIDE
SP
ED
CTR 












359,952
 4.166
Los
Angeles CA Schools EXTERIOR
WALLS_WESTERN
EL 












376,508
 4.339
Los
Angeles CA Schools ROOFING_VENICE
SH 












376,445
 4.339
Los
Angeles CA Schools PLUMBING
/
IRRIGATION_WASHINGTON
EEC 












379,400
 4.397
Los
Angeles CA Schools LUNCH
SHELTERS_HADDON
EEC 












383,100
 4.455
Los
Angeles CA Schools ROOFING_WADSWORTH
EL 












382,665
 4.455
Los
Angeles CA Schools INTERIOR
PAINT_VINE
EEC 












394,000
 4.571
Los
Angeles CA Schools Pave
Faculty
Parking
Lot_COWAN
EL
(i) 












396,837
 4.571
Los
Angeles CA Schools WALL
SYSTEMS_GATES
EEC 












397,200
 4.571
Los
Angeles CA Schools INSTALL
PLYGRND
EQ.
&
MAT_6TH
AVE
EL 












399,967
 4.629
Los
Angeles CA Schools WALL
SYSTEMS_STERRY
EEC 












398,400
 4.629
Los
Angeles CA Schools DSA
ACCESS
COMPLIANCE_DANA
MS 












404,100
 4.686
Los
Angeles CA Schools ROOFING_LAWRENCE
MS 












416,918
 4.802
Los
Angeles CA Schools RWGPL
‐
Extended
Campus
Improvements 












667,324
 4.806
Los
Angeles CA Schools Seismic
Tilt‐ups_GARDENA
SH 












430,387
 4.976
Los
Angeles CA Schools Emergency
Ligh3ng,
Fire
Alarm,
and
Security
Systems 












692,670
 4.989
Los
Angeles CA Schools PLUMBING
/
IRRIGATION_GRANT
EEC 












432,700
 5.034
Los
Angeles CA Schools REPLACE
BOILER
&
CEILING
_PASEO
DEL
REY
NAT
SC 












441,658
 5.091
Los
Angeles CA Schools HVAC_WEST
VERNON
EL 












454,138
 5.265
Los
Angeles CA Schools MODERNIZATIONS_GLUCK
(MAXWELL)
EEC 












456,400
 5.265
Los
Angeles CA Schools Domes3c
Water
Distr_REVERE
MS 












460,578
 5.323
Los
Angeles CA Schools PLUMBING
/
IRRIGATION_HYDE
PARK
EL 












460,303
 5.323
Los
Angeles CA Schools Floor
Coverings_NARBONNE
SH 












470,497
 5.439
Los
Angeles CA Schools HVAC_FAIRFAX
SH 












474,669
 5.496
Los
Angeles CA Schools Monroe
Street
Plaza 












768,000
 5.531
Los
Angeles CA Schools MODERNIZATIONS_VAUGHN
EEC 












486,900
 5.612
Los
Angeles CA Schools Wall
Coverings_POMELO
EL 












483,380
 5.612
City State Program Project
Descrip3on Funding
Required Jobs
Los
Angeles CA Schools ROOFING_MACLAY
MS 












491,693
 5.67
Los
Angeles CA Schools FOOD
SERVICES
MODERNIZATION_68TH
ST
EL 












500,000
 5.786
Los
Angeles CA Schools ROOFING_MADISON
MS 












500,000
 5.786
Los
Angeles CA Schools Concrete
Repairs_MARINA
DEL
REY
MS 












542,473
 6.249
Los
Angeles CA Schools ROOFING_SEPULVEDA
MS 












538,773
 6.249
Los
Angeles CA Schools ELE.
DISTRUBUTION
SYSTMS_EAGLE
ROCK
HS 












543,997
 6.306
Los
Angeles CA Schools DSA
ACCESS
COMPLIANCE_BRAINARD
EL 












550,453
 6.364
Los
Angeles CA Schools Terminal
&
Package
U_FLETCHER
DR
EL 












561,014
 6.48
Los
Angeles CA Schools PLUMBING
/
IRRIGATION_RAYMOND
AVE
EL 












576,023
 6.654
Los
Angeles CA Schools DSA
ACCESS
COMPLIANCE_DORSEY
SH 












583,746
 6.769
Los
Angeles CA Schools ROOFING_NO
HOLLYWOOD
SH 












607,741
 7.059
Los
Angeles CA Schools Campus
Administra3ve
Services
Building
Remodel 










1,004,586
 7.235
Los
Angeles CA Schools AIR
CONDITIONING_PALISADES
CHRTR
SH 












638,000
 7.406
Los
Angeles CA Schools Seismic
Tilt‐ups_GARDENA
SH 












643,201
 7.464
Los
Angeles CA Schools ROOFING_MONROE
SH 












675,032
 7.811
Los
Angeles CA Schools Seismic
Tilt‐ups_GARDENA
SH 












686,114
 7.926
Los
Angeles CA Schools YEAR‐ROUND
AIR
CONDITIONING
AUDITORIUM_MILLER
EL 












709,800
 8.216
Los
Angeles CA Schools Campus‐Wide
Improvements
‐
Emergency
Ligh3ng,
Fire
Alarm
and
Security
System 










1,165,933
 8.397
Los
Angeles CA Schools Domes3c
Water
Distr_MARSHALL
SH 












753,645
 8.736
Los
Angeles CA Schools ROOFING_SYLMAR
SH 












764,060
 8.852
Los
Angeles CA Schools ROOFING_NAPA
EL 












797,342
 9.199
Los
Angeles CA Schools Wall
Coverings_UTAH
EL 












795,816
 9.199
Los
Angeles CA Schools ROOFING_MONTE
VISTA
EL 












813,824
 9.431
Los
Angeles CA Schools ROOFING_COWAN
EL
(i) 












829,484
 9.604
Los
Angeles CA Schools Domes3c
Water
Distr_CANOGA
PARK
SH 












836,940
 9.662
Los
Angeles CA Schools ROOFING_MILLIKAN
MS 












859,787
 9.951
Los
Angeles CA Schools HVAC_HARTE
PREP
MS 












881,190
 10.18
Los
Angeles CA Schools FENCING
REPAIRS_MANN
MS 












932,379
 10.76
Los
Angeles CA Schools Replace
Cooling
Tower_BANNING
SH 












931,456
 10.76
Los
Angeles CA Schools YEAR‐ROUND
AIR
CONDITIONING
AUDITORIUM_FREMONT
SH 










1,000,000
 11.57
Los
Angeles CA Schools YEAR‐ROUND
AIR
CONDITIONING
GYM_FREMONT
SH 










1,000,000
 11.57
Los
Angeles CA Schools Phase
I
Renova3ons
‐
Faculty
Office 










1,641,818
 11.82
Los
Angeles CA Schools Athle3c
Field
Reloca3on 










1,685,268
 12.14
Los
Angeles CA Schools Life
Sciences
Building 










1,716,994
 12.37
Los
Angeles CA Schools Seismic
Tilt‐ups_GARDENA
SH 










1,108,179
 12.84
Los
Angeles CA Schools YEAR‐ROUND
AIR
CONDITIONING
AUDITORIUM_MANCHESTER
EL 










1,111,000
 12.84
Los
Angeles CA Schools HVAC_BIRMINGHAM
SH 










1,186,000
 13.71
Los
Angeles CA Schools ROOFING_LIGGETT
EL 










1,223,862
 14.18
Los
Angeles CA Schools Phase
I
Renova3ons
‐
Business
Educa3on 










1,981,171
 14.27
Los
Angeles CA Schools ROOFING_VENICE
SH 










1,247,259
 14.41
Los
Angeles CA Schools HVAC_ARLINGTON
HTS
EL 










1,305,594
 15.1
Los
Angeles CA Schools Seismic
Tilt‐ups_GARDENA
SH 










1,331,230
 15.39
Los
Angeles CA Schools AUDITORIUM
RENOVATIONS_FOSHAY
LC 










1,355,510
 15.68
Los
Angeles CA Schools Seismic
Tilt‐ups_VIRGIL
MS 










1,356,101
 15.68
Los
Angeles CA Schools PLUMBING
/
IRRIGATION_MOUNTAIN
VIEW
EL 










1,416,936
 16.37
Los
Angeles CA Schools FTA
Bus
Rapid
Transit
Extension
&
Winnetka
/
Mason
DeSoto
Entrances 










2,313,717
 16.66
Los
Angeles CA Schools MODERNIZATIONS_LOGAN
EEC 










1,512,600
 17.53
Los
Angeles CA Schools MODERNIZATIONS_MARVIN
EL 










1,592,201
 18.4
Los
Angeles CA Schools ROOFING_VAN
NUYS
SH 










1,588,144
 18.4
Los
Angeles CA Schools RWGPL‐
MTA
Bus
Sta3on
Extension 










2,585,488
 18.62
Los
Angeles CA Schools ELECTRICAL
/
M&O
FIRE
ALARM_TAFT
SH 










1,614,114
 18.69
Los
Angeles CA Schools Seismic
Tilt‐ups_GARDENA
SH 










1,662,268
 19.21
Los
Angeles CA Schools FOOD
SERVICES
MODERNIZATION_NORWOOD
EL 










1,700,000
 19.67
Los
Angeles CA Schools Fashion
and
Fine
Arts
Building
‐
HVAC
Upgrade 










2,794,438
 20.13
Los
Angeles CA Schools Seismic
Tilt‐ups_IRVING
MS 










1,812,624
 21
Los
Angeles CA Schools Seismic
Tilt‐ups_JEFFERSON
SH 










2,196,386
 25.4
Los
Angeles CA Schools PAVING
/
GREENING
/
EQUIPMENT_FULLBRIGHT
EL 










2,249,541
 26.04
Los
Angeles CA Schools Phase
I
Renova3ons
‐
Fine
Arts
and
Music 










3,813,416
 27.47
Los
Angeles CA Schools PAVING
/
GREENING
/
EQUIPMENT_SERRANIA
EL 










2,452,509
 28.41
Los
Angeles CA Schools ROOFING_MACLAY
MS 










2,463,342
 28.52
Los
Angeles CA Schools Seismic
Tilt‐ups_GARDENA
SH 










2,525,621
 29.22
Los
Angeles CA Schools Seismic
Tilt‐ups_MANHATTAN
EL 










2,574,123
 29.8
Los
Angeles CA Schools PLUMBING
/
IRRIGATION_MONROE
SH 










2,875,227
 33.27
Los
Angeles CA Schools ROOFING_NO
HOLLYWOOD
SH 










3,018,552
 34.95
Los
Angeles CA Schools HVAC_GRANADA
HILLS
HS 










3,069,710
 35.52
Los
Angeles CA Schools RWGPL
‐
Traffic
Mi3ga3on 










5,120,400
 36.88
Los
Angeles CA Schools AIR
CONDITIONING_HOOVER
EL 










3,479,589
 40.27
Los
Angeles CA Schools Seismic
Tilt‐ups_EL
CAMINO
REAL
SH 










4,313,628
 49.93
Los
Angeles CA Schools Jefferson
Hall 










7,188,082
 51.77
Los
Angeles CA Schools (6)
Valley
Region
Byrd
HS
Reconfigura3on
‐
Athle3c
Field
Upgrade 










5,500,000
 63.64
Los
Angeles CA Schools HVAC_SUN
VALLEY
MS 










5,774,646
 66.83
Los
Angeles CA Schools AIR
CONDITIONING_VENICE
SH 










6,000,000
 69.43
Los
Angeles CA Schools NEW
BUILDING
"EXISTING
FACILITIES"_BURBANK
MS 










6,000,000
 69.43
Los
Angeles CA Schools NEW
BUILDING
"EXISTING
FACILITIES"_UNIVERSITY
SH 










6,000,000
 69.43
Los
Angeles CA Schools FOOD
SERVICES
MODERNIZATION_MULTNOMAH
EL 










6,700,000
 77.53
Los
Angeles CA Schools Landscape
and
Site
Master
Plan 








11,577,358
 83.38
Los
Angeles CA Schools Community
Services
Center 








12,121,212
 87.3
Los
Angeles CA Schools Library,
Administra3on
and
Campus
Quad 








12,759,171
 91.9
City State Program Project
Descrip3on Funding
Required Jobs
Los
Angeles CA Schools (8)
Aldama
ES
‐
Addi3on
‐
CSR 








10,506,804
 121.6
Los
Angeles CA Schools Facili3es
Maintenance 








17,862,839
 128.7
Los
Angeles CA Schools Student
Service
Center 








21,494,318
 154.8
Los
Angeles CA Schools Maintenance
and
Opera3ons 








25,518,341
 183.8
Los
Angeles CA Schools Parking
Structures 








25,518,341
 183.8
Los
Angeles CA Schools Business
and
Technology 








38,277,512
 275.7
Los
Angeles CA Schools Parking
Structures 








40,829,346
 294.1
Los
Angeles CA Schools Library
and
Learning
Resource
Center 








44,610,394
 321.3
Los
Angeles CA Schools (3)
Central
LA
HS
#12
* 








30,325,536
 350.9
Los
Angeles CA Schools (5)
East
Valley
Area
New
HS
#1B
Addi3on
* 








30,451,178
 352.4
Los
Angeles CA Schools (1)
Valley
Region
Monroe
Span
K‐8
Addi3on
* 








30,906,467
 357.6
Los
Angeles CA Schools (4)
Valley
Region
MS
#3
* 








37,641,457
 435.5
Los
Angeles CA Schools Library
Learning
Center 








62,519,936
 450.3
Los
Angeles CA Schools East
Campus
Complex 








72,727,273
 523.8
Los
Angeles CA Streets/Roads Balboa
Blvd
Traffic
Signal
at
Knollwood
Shopping
Center
Driveway 












130,000
 1
Los
Angeles CA Streets/Roads El
Dorado
and
Bromwich
Pedestrian
Improvements 












550,000
 3
Los
Angeles CA Streets/Roads La
Brea
Pedestrian
Improvements 












500,000
 3
Los
Angeles CA Streets/Roads LAUSD
Valley
Region
HS
#4
Pedestrian
Improvements 












300,000
 3
Los
Angeles CA Streets/Roads Santa
Monica
and
Western
Pedestrian
Improvements 












396,000
 3
Los
Angeles CA Streets/Roads Terra
Bella
Street
Widening 












400,000
 3
Los
Angeles CA Streets/Roads Angel's
Knoll
Pedestrian
Improvements 












290,000
 4
Los
Angeles CA Streets/Roads Barnsdall
TOD
Pedestrian
Improvements 












284,000
 4
Los
Angeles CA Streets/Roads Commerce
Avenue
Pedestrian
Improvements 












900,000
 5
Los
Angeles CA Streets/Roads Balboa
Road
and
San
Fernando
Road
Intersec3on
Improvement 












500,000
 6
Los
Angeles CA Streets/Roads Coldwater
Canyon
Av
at
Raymer
St 












300,000
 6
Los
Angeles CA Streets/Roads East
Hollywood
Pedestrian
Improvements 










1,000,000
 6
Los
Angeles CA Streets/Roads Pacific
Avenue
Pedestrian
Improvements 










1,040,000
 6
Los
Angeles CA Streets/Roads Sharpe
Avenue
(Garber
to
Kamloops)
Drainage
Pedestrian
Improvements 










1,250,000
 7
Los
Angeles CA Streets/Roads Canoga
Park
Pedestrian
Improvements
(Phase
III) 










1,566,000
 9
Los
Angeles CA Streets/Roads Pico
Boulevard
Pedestrian
Improvements 










1,800,000
 10
Los
Angeles CA Streets/Roads New
Leb
Turn
Improvements 










2,000,000
 12
Los
Angeles CA Streets/Roads Sun
Valley
Median
Improvements 










2,000,000
 12
Los
Angeles CA Streets/Roads CD
7
Scafered
Pedestrian
Improvements 










2,300,000
 13
Los
Angeles CA Streets/Roads NoHo
Pedestrian
Improvements 












940,000
 13
Los
Angeles CA Streets/Roads Sylmar
Pedestrian
Improvements 










2,300,000
 13
Los
Angeles CA Streets/Roads Alvarado
Pedestrian
Improvements 










1,250,000
 15
Los
Angeles CA Streets/Roads Olympic
Blvd
Widening
/
Alameda
to
McGarry
St 










2,600,000
 15
Los
Angeles CA Streets/Roads Sepulveda
Blvd
at
Burbank
Blvd
Intersec3on
Improvements 












450,000
 18
Los
Angeles CA Streets/Roads Jordan
Downs
Century
Blvd.
Extension 










3,500,000
 20
Los
Angeles CA Streets/Roads New
Traffic
Signals 










3,500,000
 20
Los
Angeles CA Streets/Roads Chinatown
Pedestrian
Improvements 










1,000,000
 26
Los
Angeles CA Streets/Roads City
of
Los
Angeles
Bay
Harbor
Region
Resurfacing
Projects 










5,000,000
 29
Los
Angeles CA Streets/Roads City
of
Los
Angeles
East
Valley
Region
Resurfacing
Projects 










5,000,000
 29
Los
Angeles CA Streets/Roads City
of
Los
Angeles
North
Central
Region
Resurfacing
Projects 










5,000,000
 29
Los
Angeles CA Streets/Roads City
of
Los
Angeles
West
Valley
Region
Resurfacing
Projects 










5,000,000
 29
Los
Angeles CA Streets/Roads LAX
Hospitality
Enhancement
Zone
Projects 










7,000,000
 41
Los
Angeles CA Streets/Roads Highway‐Rail
Grade
Crossing
Improvement
Program
(HRGCIP) 










2,368,000
 50
Los
Angeles CA Streets/Roads Overland
Ave
Bridge
Widening
Over
I‐10
Freeway 










2,000,000
 50
Los
Angeles CA Streets/Roads Signal
LED
Retrofit
Program 










9,000,000
 52
Los
Angeles CA Streets/Roads Widening
of
2
US‐101
Off‐Ramps 








11,000,000
 64
Los
Angeles CA Streets/Roads Advanced
Transporta3on
Management
Informa3on
and
Security
Systems 










2,000,000
 66
Los
Angeles CA Streets/Roads Sepulveda
Blvd.
Reversible
Lane,
Bike
Lane
and
Intersec3on
Improvements
Project
 










4,000,000
 83
Los
Angeles CA Streets/Roads Citywide
Paving
of
Un‐Paved
Roads 








20,000,000
 116
Los
Angeles CA Streets/Roads Goodyear
Tract
Infrastructure
Improvements 








29,961,000
 173
Los
Angeles CA Streets/Roads Harry
Bridges
Blvd.
Improvements 








25,597,000
 184
Los
Angeles CA Streets/Roads 60
Freeway
Repavement
Project 








46,000,000
 266
Los
Angeles CA Streets/Roads Wilshire
Boulevard
Repavement
Project 








60,000,000
 347
Los
Angeles CA Streets/Roads I‐HOV
Soundwall
SR‐118
‐
SR
14 








39,000,000
 528
Los
Angeles CA Streets/Roads I‐405
Car
Pool
Lane
Enhancements 






100,000,000
 579
Los
Angeles CA Streets/Roads 210
Freeway
Repavement
Project 






112,000,000
 648
Los
Angeles CA Streets/Roads I‐5
HOV
from
SR‐170
to
SR‐118 








55,000,000
 1858
Los
Angeles CA Streets/Roads Major
Street
Repair
and
Resurfacing 






500,000,000
 2893
Los
Angeles CA Transit N.
Parking
Lot
at
Chatsworth
Metrolink
Sta3on 










1,500,000
 8.679
Los
Angeles CA Transit 410
Center
Street
Improvements 










1,878,150
 10.87
Los
Angeles CA Transit Roof
Replacement 










2,189,079
 12.67
Los
Angeles CA Transit Cypress
Park
Bus
Division
Facility
Improvements
(Phase
IV) 










3,000,000
 17.36
Los
Angeles CA Transit Cypress
Park
Bus
Division
Facility
Improvements
(Phase
II) 










4,650,000
 26.9
Los
Angeles CA Transit Cypress
Park
Bus
Division
Facility
Improvements
(Phase
III) 










5,500,000
 31.82
Los
Angeles CA Transit Lankershim
Transit
Center 










6,000,000
 34.71
Los
Angeles CA Transit Harbor
Transitway
Sta3on
Improvements 








11,000,000
 63.64
Los
Angeles CA Transit Bauchet
Street
Storage
&
Facili3es
Maintenance
Structure 








13,000,000
 75.21
Los
Angeles CA Transit Commuter
Express
Bus
Replacement
(CNG) 








10,500,000
 75.94
Los
Angeles CA Transit Metro
Redline
Yard
(Division
20)
Carwash
&
Cleaning 








15,400,000
 89.1
Los
Angeles CA Transit Electrify
Compression
of
Natural
Gas
at
Combus3on
Engines
at
CNG
Fueling
Sta3ons 








28,000,000
 162
Los
Angeles CA Transit Bus
Replacement
Project
(Contract
Services
Buses) 








40,000,000
 231.4
Los
Angeles CA Transit Universal
City
Sta3on
parking/Bus
Layover
facility 








47,000,000
 271.9
Los
Angeles CA Transit Metro
Blue
Line
Trac3on
Power
Substa3on 








82,000,000
 474.4
Los
Angeles CA Transit Bus
Replacement
Project
(Metro
Buses) 






291,000,000
 1684
City State Program Project
Descrip3on Funding
Required Jobs
Los
Angeles CA Transit Light
Rail
and
Heavy
Rail
Vehicle
Rebuilding
for

the
Blue
Line
and
the
Red
Line
Rail
Systems 






350,000,000
 2025
Los
Angeles CA Water Swarthmore
Redirect 












455,000
 2.625
Los
Angeles CA Water Van
Nuys
High
School
Water
Recycling
Project 












700,000
 4.05
Los
Angeles CA Water Van
Nuys
Water
Recycling
Project 










1,000,000
 5.786
Los
Angeles CA Water Valley
Presbyterian
Hospital
Water
Recycling
Project 










1,200,000
 6.943
Los
Angeles CA Water Cypress
Park
Water
Recycling
Project 










1,715,000
 9.923
Los
Angeles CA Water Wafs
Tower
Storm
Drain 










2,100,000
 12.15
Los
Angeles CA Water Hansen
Dam
Water
Recycling
Project 










2,548,631
 14.75
Los
Angeles CA Water Woodman
Avenue
Infiltra3on
Project 










3,000,000
 17.36
Los
Angeles CA Water Taylor
Yard
Water
Recycling
Project
–
Parcel
C
Development 










4,600,000
 26.61
Los
Angeles CA Water Tujunga
Well
Treatment 










6,000,000
 34.71
Los
Angeles CA Water DCT
‐
Filter
Replacement
Installa3on 








11,304,140
 65.17
Los
Angeles CA Water Hansen
Spreading
Grounds
Enhancement
Project 








12,000,000
 69.43
Los
Angeles CA Water Temescal
Canyon
Park
Stormwater
Diversion
and
Treatment 










7,473,718
 86.09
Los
Angeles CA Water Santa
Ynez
Reservoir
Floa3ng
Cover
Project
‐
Spec
7106 








22,575,000
 130.6
Los
Angeles CA Water 4th
Ave/Slauson
Sewer
Rehab. 








26,365,880
 151.8
Los
Angeles CA Water North
Ouzall
Sewer

Maze
Rehab:
Phase
5 








27,118,080
 156.2
Los
Angeles CA Water Van
Norman
Chloramina3on
Stn
#1
&
#2 








33,000,000
 190.9
Los
Angeles CA Water City
Trunkline
 








34,000,000
 196.7
Los
Angeles CA Water Central
Ouzall
Sewer
Rehab
NORS
Div
4
to
Market
St 








35,111,640
 202.5
Los
Angeles CA Water Santa
Monica
Bay
Low
Flow
Diversion
Upgrades
(Packages
1,
2,
3
and
4) 








22,981,237
 208
Los
Angeles CA Water River
Supply
Conduit
Unit
4 








38,000,000
 219.9
Los
Angeles CA Water River
Supply
Conduit
Unit
3










55,000,000
 318.2
Los
Angeles CA Water Big
Tujunga
Dam
–
San
Fernando
Basin
Groundwater
Enhancement
Project 








44,250,000
 611.6
Los
Angeles CA Water Water
Recycling
Program 






111,500,000
 645.1
Manhafan
Beach CA CDBG Water
Filtra3on 










8,000,000
 40
Manhafan
Beach CA CDBG Bridge
Widening 








10,000,000
 100
Manhafan
Beach CA CDBG Sewer
Line
replacement 








30,000,000
 200
Manhafan
Beach CA CDBG New
Library










35,000,000
 250
Manhafan
Beach CA Energy City
Solar
Conversion 








15,000,000
 100
Manhafan
Beach CA Transit CNG
Bus
Purchases 










5,000,000
 50
Manhafan
Beach CA Water Sewer
Line
Replacement 








30,000,000
 200
Merced CA Airport Paving
for
Airport
Hangar
Construc3on.
Merced’s
Airport
is
growing
but
faces
economic
challenges.

This
project
would
include
paving
an
area
to
move

a
number
of
exis3ng
hangars,
and
provide
space
to
build
new
hangars.

The
new
facili3es
will
accommoda













750,000
 15
Merced CA Airport Commercial
Truck
Parking
Lot
Renova3on.

This
project
completes
a
parking
lot
at
the
Municipal
Airport
to
relieve
community‐wide
neighborhood

problems
with
commercial
truck
parking.

The
improvements
include
demolishing
and
remove
a
dilapidated

abandone 












350,000
 25
Merced CA Airport New
Airport
Hangars
The
project
adds
capacity
at
the
Municipal
Airport
to
accommodate
more
general
avia3on
aircrab.

The

hangars
are
pre‐engineered
steel
buildings
to
save
on
cost.

Up
to
16
more
aircrab
could
be
housed,
adding

greater
economic
vitali 










1,200,000
 30
Merced CA CDBG Applegate
Park
Expansion:

The
project
funds
development
of
an
approximately
1
acre
blighted
area
at
the

corner
of
26th
&
"M"
Street,
to
improve
the
City’s
largest
and
most
heavily
used
park.














200,000
 15
Merced CA CDBG ADA
Ramps
&
Sidewalks
The
City
has
an
annual
project
to
iden3fy
and
priori3ze
needs
for
ADA‐compliant
ramps
and
adjacent

sidewalks.

The
addi3onal
funding
allows
accelera3on
of
improvements,
par3cularly
in
older,
low‐income

areas,
greatly
benefi3ng 










1,800,000
 20
Merced CA CDBG Bellevue
Ranch
East
Phase
3
Improvements:


The
project
will
provide
complete
public
improvements,
 










1,200,000
 20
Merced CA CDBG Lester
Yoshida
Neighborhood
Park:

The
project
funds
development
of
a
4‐acre
neighborhood
in
northeast
 












900,000
 20
Merced CA CDBG Sidewalk
Rehabilita3on 










1,750,000
 20
Merced CA CDBG Charles
Ogletree
Neighborhood
Park:

Funding
is
needed
for
development
of
a
7‐acre
neighborhood
park
in
 












900,000
 25
Merced CA CDBG Fahrens
Creek
Park,
Phase
3:
Project
enhances
habitat
and
restores
na3ve
plants
and
grasses
along
Fahrens
 










1,200,000
 30
Merced CA CDBG Merced
Theatre
Restora3on:
The
City
and
Redevelopment
Agency
have
been
seeking
to
restore
this
signature
 










2,000,000
 30
Merced CA CDBG Alfarata
Ranch
Neighborhood
Park 












900,000
 55
Merced CA CDBG Flanagan
Neighborhood
Park 












900,000
 60
Merced CA CDBG South
Merced
Mini‐Parks
(9)
The
project
will
fund
the
removal
and
replacement
of
exis3ng
playground
equipment
for
ADA
compliance
in

South
Merced
mini‐parks.

The
result
will
be
to
allow
children
with
and
without
physical
disabili3es
to
use

playground
e 












675,000
 60
Merced CA Energy Downtown
Ligh3ng
Project:
The
project
would
install
“green”
solar
lights
in
downtown.

The
type
of
ligh3ng

system,
and
loca3ons
for
the
installa3on
has
already
been
iden3fied.

The
project
would
add
needed
ligh3ng

and
be
the
first
major
solar
projec 












300,000
 30
Merced CA Public
Safety Childs
and
G
Traffic
Signal:
The
project
consists
of
the
installa3on
of
a
new
traffic
signal
for
befer
traffic

circula3on,
new
sidewalk,
gufer,
storm
water
drainage
line,
and
sewer
catch
basin
serving
a
low
socio‐
economic
neighborhood.

The
project
wi 












115,000
 10
Merced CA Public
Safety G
and
26th

Traffic
Signal:

This
project
replaces
an
exis3ng
traffic
signal
to
meet
current
standards,
and
to

create
befer
traffic
circula3on.

The
project
will
reduce
traffic
conges3on
and
improve
air
quality
 












250,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Merced CA Public
Safety Yosemite
and
Stadium
Street
Safety
Measures:
The
project
includes
installa3on
of
a
new
traffic
signal,

landscaping
and
wrought
iron
fencing
to
redirect
pedestrian
traffic
to
crosswalks
at
the
newly
signalized

intersec3on. 












160,000
 15
Merced CA Public
Safety CCTV
&
Transporta3on
Management
Improvements:
The
installa3on
of
infrastructure
including
fiber,
conduit
and
CCTV
Camera
installa3on
to
parks,
city
wells,
main

City
corridors
and
loca3ons
in
a
community
plagued
with
gang
crimes,
graffi3
and
drug
use 










3,650,000
 25
Merced CA Streets/Roads Street
Seal‐Coa3ng:

This
project
provides
funding
for
slurry
and
scrub
seal
treatment
of
streets
throughout
the

city,
increasing
service
life
considerably.

Maintaining
roadways
creates
jobs
immediately,
and
provides
befer

infrastructure
for
support
of 










1,000,000
 25
Merced CA Streets/Roads Downtown
Streetscape
Improvements:

The
project
would
complete
needed
sidewalk
and
ligh3ng

improvements,
and
add
brick
pavers
and
landscaping
to
connect
the
Merced
Center
and
Civic
Center
area
to

the
downtown
core.
The
end
result
would
add
invaluable
par 










1,000,000
 30
Merced CA Streets/Roads East
16th
Street
Community
Entrance:
This
beau3fica3on
project
would
reconstruct
a
major
entry
point
into
 










1,500,000
 30
Merced CA Streets/Roads Street
Overlays
This
work
is
necessary
to
repair
deteriorated
streets
throughout
the
City
of
Merced.
The
work
would
include

complete
street
overlays
(“grind
and
repave”).

The
community’s
streets
are
a
disincen3ve
to
industrial
and

commercial
developmen 










3,000,000
 30
Merced CA Streets/Roads Cormorant
Bridge
Construc3on 










1,500,000
 40
Merced CA Streets/Roads G
Street
Undercrossing:

The
City
experiences
significant
traffic
delays
of
approximately
2
hours
the
BNSF
 










4,800,000
 80
Merced CA Streets/Roads Highway
59/Cooper
Avenue
Interse3on 










2,000,000
 80
Merced CA Streets/Roads Childs
Avenue
Widening 










1,200,000
 90
Merced CA Water Airport
Drainage
Project:

Add
a
parallel
18‐inch
storm
drain
pipeline
on
Riggs
Avenue
and
rework
the
Airport
 












100,000
 20
Merced CA Water G
Street
and
Canal
Street
Water
Main
Replacement:
Replace
deteriorated
water
main,
valves
and
complete
 










3,500,000
 20
Merced CA Water Airport
Area
Sewer
Line
Replacement:

A
key
sanitary
sewer
line
crossing
the
Merced
Municipal
Airport
has
 












700,000
 25
Merced CA Water R
Street
Environmental
Cleanup
Project:

The
project
cleans
up
groundwater
contaminated
with
gasoline

containing
MTBE,
which
inhibits
development
of
brownfield
property
and
threatens
a
municipal
well
located

700
feet
away
from
the
parcel
serving
a
low
soc 












700,000
 25
Merced CA Water Storm
Drain
at
Julie
and
R
Street:
This
project
will
provide
an
alternate
drainage
path
for
a
storm
sewer
system
that
cannot
func3on
during
high

flows
in
Bear
Creek
resul3ng
in
rou3ne
flooding
of
the
neighborhood.

The
construc3on
of
alternate
draina 












294,000
 25
Merced CA Water Bradley
Overpass
U3lity
Service
Reloac3on:

CalTrans
is
preparing
for
reconstruc3on
of
the
Bradley
Overpass
in

the
City
of
Merced
in
the
year
2009.

However,
the
City
will
be
required
to
relocate
underground
u3li3es
as

needed.

Comple3on
of
the
u3l 












550,000
 30
Merced CA Water Gerard
Avenue
Sewer
Lining
Project:

The
Gerard
Avenue
trunk
sewer
was
constructed
of
corrugated
metal

pipe
in
the
1950's.

It
has
rusted
in
many
loca3ons
and
is
in
dire
need
of
rehabilita3on
due
to
infiltra3on
and
ex‐
filtra3on. 








10,000,000
 60
Merced CA Water Waste
Water
Treatment
Plant
Solids
Handling
Facili3es:
Funding
will
be
used
to
upgrade
the
solids
handling
 








28,000,000
 80
Merced CA Water Waste
Water
Treatment
Plant
Phase
4
Upgrade/Expansion:

Construc3on
of
new
process
facili3es
and
 








27,500,000
 150
Modesto CA Airport Environmental
Assessment
‐
Terminal
Project 












368,421
 10
Modesto CA Airport Apron
Rehabilita3on
(Westside)
‐
Prevent
Damage
to
Aircrabs 












400,000
 20
Modesto CA Airport Enhance
Runway
Safety
Area
(Rwy
10R)
‐
Construct
New
Taxiway 












400,000
 20
Modesto CA Airport Terminal
Complex
‐
Design
(Ini3al
2010) 










1,578,947
 20
Modesto CA Amtrak Construct
a
Second
Train
Track
‐
Modesto
Amtrak
Sta3on 










2,000,000
 20
Modesto CA CDBG Modesto
Airport
Neighborhood
Empire
St 












400,000
 10
Modesto CA CDBG Neighborhood
Revitaliza3on
Related
Construc3on
‐
Construct
a
Small
Community
Center 












300,000
 15
Modesto CA CDBG Weed
and
Seed
Construc3on
‐
Construct
a
Small
Community
Center 












300,000
 15
Modesto CA Energy 5kw
Solar
Shade
Structures
in
5
City
Parks
‐install
5kw
Solar
shade
structures
in
5
City
parks
to
provide
green
 












200,000
 10
Modesto CA Energy Energy
Efficient,
Green
Classroom
Retrofit
retrofit
exis3ng
modular
at
Modesto
Compos3ng
for
use
in
Resource
 












200,000
 10
Modesto CA Energy 100
kw
Solar
Array
at
Modesto
Compos3ng
‐install
a
100kw
solar
array
at
Modesto
Compos3ng
to
power
 












700,000
 20
Modesto CA Energy Energy
Retrofits
of
Government
Buildings,
VFD
‐install
VFD
on
HVAC
units
in
City
buildings
to
reduce
energy
use 












500,000
 20
Modesto CA Energy 50
kw
Solar
Shade
Structures
on
3
City
Parking
Garages
‐install
50
kw
shade
structure
on
each
of
3
City
pkg
 










1,500,000
 50
Modesto CA Energy 500
kw
Solar
Roof
on
Corpora3on
Yard
Building
‐install
500
kw
Solar
roof
on
City
Corpora3on
Yard
building
to
 










2,500,000
 100
Modesto CA Energy Partnership
for
Residen3al
Solar
Retrofits
‐install
5kw
solar
systems
on
100
low
income
and
Habitat
for
 










2,000,000
 100
Modesto CA Energy Solar
Roofs
on
City
Government
Buildings
‐install
solar
roofs
on
6
City
buildings
to
provide
power
to
those
 










5,000,000
 100
Modesto CA Housing Public
Housing
Moderniza3on 










7,500,000
 30
Modesto CA Public
Safety DNA
Evidence
Collec3on,
Processing,
and
Analysis
‐
Process
DNA
Evidence
for
Unsolved
Crimes 










1,500,000
 5
Modesto CA Public
Safety Addi3onal
Sworn
Police
Officer
Staffing/Hiring
Grant 










4,500,000
 45
Modesto CA Streets/Roads Mancini
Bowl
‐
Replace
Aluminum
Benches 












100,000
 5
Modesto CA Streets/Roads Modesto
Centre
Plaza
Roofing
Upgrade
 












200,000
 5
Modesto CA Streets/Roads Park
Irriga3on
System
Replacement 












600,000
 5
Modesto CA Streets/Roads Dry
Creek
Trail
Erosion
Repair 










1,000,000
 6
Modesto CA Streets/Roads Play
Equipment
Replacement 












600,000
 6
Modesto CA Streets/Roads Class
II
Bike
Lanes
‐
Construct
64
Miles
of
Class
II
Bike
Lanes
City
Wide 










2,000,000
 10
Modesto CA Streets/Roads Hetch
Hetchy
Trail
‐
Construct
3
Miles
of
Bike
Trails
Along
Hetch
Hetchy
Transmission
Lines 










1,700,000
 10
Modesto CA Streets/Roads Pelandale
Avenue
Class
I
Bike
Path
‐
Construct
8
Miles
of
Bike
Path
Along
the
Pelandale
Expressway 










4,500,000
 10
Modesto CA Streets/Roads MID
Lateral
Paths
‐
Construct
34
Miles
of
Bike
and
Pedestrian
Trails
Along
Irriga3on
Canals 








18,700,000
 20
Modesto CA Streets/Roads Tuolumne
Boulevard
Extension
‐
Construct
a
2
Lane
Access
Road
to
Tuolumne
River
Regional
Park 










5,000,000
 20
Modesto CA Streets/Roads 2009
Street
Rehab
and
Reconstruc3on 








10,000,000
 25
Modesto CA Streets/Roads Trail
Connec3on/TRRP
Gateway‐Legion
Park
‐
Construct
1.5
Miles
of
Bike
Trails 










3,000,000
 25
Modesto CA Streets/Roads Virginia
Corridor
Construc3on
‐
Construct
2.2
Miles
of
Pedestrian
and
Bike
Lanes 








10,000,000
 25
Modesto CA Streets/Roads ADA
Curb
Ramps 








33,000,000
 100
Modesto CA Streets/Roads Pelandale
Avenue/State
Route
99
Interchange
Reconstruc3on 








50,000,000
 100
Modesto CA Streets/Roads 2009
Arterial
Street
Overlay
Project 








47,000,000
 500
Modesto CA Streets/Roads 2009
Cape
&
Slurry
Seal
Project 








35,000,000
 500
Modesto CA Streets/Roads 2009
Collector
Street
Overlay
Project 








47,000,000
 500
Modesto CA Transit Bus
Rehabilita3on 












500,000
 10
Modesto CA Transit Purchase
7
New
Buses 










3,000,000
 10
Modesto CA Transit Bus
Stop
Improvements
‐
Add
Shelters
and

Pavement. 












500,000
 20
Modesto CA Transit Bus
Maintenance
Facility
Design
&
Construc3on 










8,000,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
Modesto CA Water Tank
Safety
Fall
Protec3on 












100,000
 3
Modesto CA Water Airport
Irriga3on
Well 












100,000
 5
Modesto CA Water Annual
Sewer
Rehabilita3on
 












800,000
 10
Modesto CA Water Downstream
Improvements‐Pressure
Reduc3on
Valves 










4,000,000
 10
Modesto CA Water El
Rio
Sewer
Replacement
‐
Relocate
a
Sewer
Main
Away
from
a
Riparian
Corridor 










2,000,000
 10
Modesto CA Water Ellison
Sewer
Rehabilita3on
‐
Replace
a
Collapsed
Sewer
Main 












300,000
 10
Modesto CA Water Emergency
Generators
‐
Install
Backup
Generators
at
Water
Well
and
Tank
Sites 










1,000,000
 10
Modesto CA Water Gaseous
Chlorine
Conversion 










1,000,000
 10
Modesto CA Water Jennings
Road
Grout
Stabiliza3on 










1,000,000
 10
Modesto CA Water Shackelford
Crossing
‐
Rehabilitate
an
Exis3ng
Sewer
Crossing
Over
the
Tuolumne
River 










1,000,000
 10
Modesto CA Water Strengthen
&
Replace
Waterlines 










1,000,000
 10
Modesto CA Water Wellhead
Treatment
‐
Salida 










1,000,000
 10
Modesto CA Water Kansas‐Needham
Soil
Remedia3on 










1,000,000
 15
Modesto CA Water Mildred
Perkins
Water
Well 










2,000,000
 15
Modesto CA Water Replace
Well
#226 










2,000,000
 15
Modesto CA Water Scenic
Lib
Sta3on
Improvements 










2,000,000
 15
Modesto CA Water Waterford
Water
Well 










2,000,000
 15
Modesto CA Water 9th
Street
Storm
Drain
Rehabilita3on
‐
Add
a
New
Storm
Drain
Pipe 










7,000,000
 20
Modesto CA Water Downstream
Improvements
‐
Virginia
Corridor
‐
Install
New
Water
Transmission
Pipes 








11,000,000
 20
Modesto CA Water Downstream
Improvements
‐Yosemite
Transmission
Line
‐
Install
3
Miles
of
New
Water
Transmission
Pipe 










7,000,000
 20
Modesto CA Water State
Route
132
Replace
Waterline 










2,000,000
 20
Modesto CA Water Sufer
Avenue
Bypass
Rehabilita3on 










4,500,000
 20
Modesto CA Water Water
Quality
Laboratory
Remodel 










1,000,000
 20
Modesto CA Water Emerald
Trunk
Rehabilita3on
‐
Repair
a
50
Year
Old
Main
Sewer
Trunk 










9,600,000
 30
Modesto CA Water Primary
Ouzall
Rehabilita3on 








23,200,000
 40
Modesto CA Water Phase
1A
Wastewater
Treatment
Plant
‐
Increase
Wastewater
Capacity
by
up
to
2.5
Million
Gallons
Per
Day 








20,000,000
 60
Napa CA CDBG Sidewalk
Replacement,
Los
Robles 










1,000,000
 10
Napa CA CDBG Street
Reconstruc3on,
Los
Robles 










2,000,000
 20
Napa CA Streets/Roads Misc.
Street
Reconstruc3on
City‐wide 








20,000,000
 300
Napa CA Water 2009
Water
Meter
Replacement
Project 










1,000,000
 10
Napa CA Water Hidden
Glen
Pump
Sta3on 












750,000
 10
Napa CA Water Dwyer
Road
Pump
Sta3on 










2,000,000
 15
Napa CA Water 2009
Water
Main
Replacement
Project 










2,000,000
 30
Napa CA Water Alston
Park
Tank
#1
Replacement 










6,000,000
 30
Napa CA Water Napa
Creek
Flood
protec3on 










9,000,000
 150
Newark CA Streets/Roads Central
Avenue
Overpass
‐
Environmental
and
Design 












500,000
 6
Newark CA Streets/Roads Thornton
Avenue
Widening
‐
Envrionmental
and
Design 












500,000
 6
Newark CA Streets/Roads 2009
Asphalt
Concrete
Pavement
Overlay
‐
Various
Streets 










2,000,000
 30
Newark CA Streets/Roads 2010
Asphalt
Concrete
Pavement
Overlay
‐
Various
Streets 










2,000,000
 30
Oakland CA Airport Pump
House
Replacement
at
the
Oakland
Airport 








10,000,000
 40
Oakland CA Airport Aircrab
East
Apron
and
Taxiways
‐
Phase
3 








20,000,000
 75
Oakland CA Airport North
Field
Infield
Roadway 








20,000,000
 75
Oakland CA Airport Levee
strengthening
at
the
Oakland
Airport 








30,000,000
 80
Oakland CA Airport Parking
Garage
at
Oakland
Interna3onal
Airport 






300,000,000
 120
Oakland CA CDBG Document
Management
for
PWA
‐
Funding
will
be
used
to
implement
an
enterprise‐class
document

management
system
for
records
related
to
environmental
remedia3on
of
City‐owned
proper3es.

The
project

will
leverage
the
City’s
exis3ng,
successful
investment 














50,000
 5
Oakland CA CDBG PWA
Equipment
Services
Technology
Learning
Center
‐
Funding
will
be
u3lized
to
install
networking,
computer,

printer,
projector,
and
related
equipment
to
establish
a
Public
Works
Agency
Equipment
Services
Division

Technology
Learning
Center.
 














40,000
 5
Oakland CA CDBG Corporate–Community
Partnerships
‐
The
project
will
encourage
Oakland
businesses
and
the
City
government
 












250,000
 8
Oakland CA CDBG E‐Government
Network
Infrastructure
‐
E‐government
enables
the
delivery
of
informa3on
and
services
online

through
the
Internet
or
other
digital
means.
The
use
of
the
Internet
to
deliver
government
informa3on
and

services
will
provide
benefits
 












300,000
 10
Oakland CA CDBG Oakland
Head
Start
Facility
Improvements
‐
construc3on,
repair,
and
playground
development
at
seven
Head

Start
centers 












700,000
 10
Oakland CA CDBG Upgrades
to
the
Oakland
Conven3on
Center 








15,000,000
 10
Oakland CA CDBG Fruitvale
La3no
Cultural
and
Performing
Arts
Center
‐
Federal
funding
will
be
used
for
construc3on
costs
(i.e.

structural,
mechanical,
electrical,
and
plumbing
systems,
seismic
reinforcement,
elevator,
etc.)











1,000,000
 12
Oakland CA CDBG 640
RMP
Cover,
Phase
2,
at
the
Former
Oakland
Army
Base 










1,700,000
 18
Oakland CA CDBG Alternate
Compu3ng
Facility
for
Disaster
Recovery
‐
The
goal
on
this
project
to
establish
a
partnership
between

the
City
of
Oakland
and
another
city
similar
in
size
to
construct
geographically
dispersed
disaster
recovery

sites. 










1,584,000
 19
Oakland CA CDBG Deconstruc3on
of
Historic
Warehouses
803
and
804
at
the
Former
Oakland
Army
Base 










2,400,000
 30
Oakland CA CDBG 3
new
libraries











60,000,000
 40
Oakland CA CDBG Seismic
Retrofit
and
Safety
Upgrades
to
H.J.
Kaiser
Conven3on
Center 








60,000,000
 40
Oakland CA CDBG On‐going
park
improvement
projects
iden3fied
in
the
approved
Park
Priori3za3on
project
list
 








90,000,000
 60
Oakland CA CDBG Expand,
relocate
and
upgrade
17
libraries
 






270,000,000
 180
Oakland CA Energy Fuel
Cell
Vehicle
Program 










5,000,000
 5
Oakland CA Energy Sustainable
Upgrades
to
Aqua3c
Centers 








10,000,000
 12
Oakland CA Energy FY09
funding
is
requested
to
support
the
following
elements
of
this
effort:
the
East
Bay
Green
Jobs
Project;
the
 










3,800,000
 45
City State Program Project
Descrip3on Funding
Required Jobs
Oakland CA Energy Metro
Area
Green
Ins3tute
‐
The
Metro
Area
Green
Ins3tute
will
serve
as
a
clearinghouse
for
low‐carbon

economic
development
efforts
na3onally.
The
Ins3tute
will
compile
and
disseminate
data
gleaned
through
the

exis3ng
program
sand
provide
technical
a 










5,000,000
 60
Oakland CA Energy Sustainable
Upgrades
to
Fire
Sta3ons 








15,000,000
 80
Oakland CA Energy Sustainable
Upgrades
to
Civic
Center
Buildings 








25,000,000
 90
Oakland CA Energy Sustainable
Upgrades
to
Libraries 








22,500,000
 100
Oakland CA Housing Oakland
Community
Land
Trust
‐
Funding
will
be
u3lized
to
purchase
and
rehabilitate
foreclosed
proper3es
as
 








20,000,000
 240
Oakland CA Public
Safety Prisoner
Transport
Vehicles
‐

Since
the
OPD
Jail
closure
in
2005,
police
officers
shufle
between
North
County,
 












260,000
 3
Oakland CA Public
Safety Mobile
Incident
Command
Post
‐
OPD
currently
has
two
older,
outdated
Mobile
Command
Posts.

Both
 












503,333
 6
Oakland CA Public
Safety Oakland’s
Special
Prosecu3on
Project
‐
Funding
will
support
the
implementa3on
of
a
local
Special
Prosecu3on

Team
as
part
of
the
Mayor’s
Crime
Reduc3on
Strategy.

The
Project
will
reduce
quality
of
life
incidents
and

address
low‐level
crimes
 












612,000
 6
Oakland CA Public
Safety Emergency
Generators 










8,000,000
 10
Oakland CA Public
Safety Various
capital
improvements
at
exis3ng
fire
sta3ons
and
public
safety
facili3es
 








15,000,000
 10
Oakland CA Public
Safety Automa3c
Vehicle
Loca3ng
(AVL)
Systems
‐
Funding
will
be
u3lized
to
install
Automa3c
Vehicle
Loca3ng

systems
on
all
public
vehicles. 










1,056,306
 12
Oakland CA Public
Safety Oakland
Police
Department
Data/Voice
Network
‐
The
project
will
involve
the
re‐cabling
of
the
network
 










1,100,000
 12
Oakland CA Public
Safety Oakland
CompStat
‐
Funding
will
be
u3lized
to
develop,
design
and
deploy
a
centralized
and
consolidated

criminal
data
repository
system
in
Oakland. 










1,325,000
 16
Oakland CA Public
Safety Patrol
Vehicle
Acquisi3on
‐
Funding
will
be
u3lized
to
increase
the
police
vehicle
fleet
from
399
vehicles
to
429

with
Federal
funding
through
the
acquisi3on
of
30
addi3onal
police
vehicles.











1,740,000
 20
Oakland CA Public
Safety Emergency
Signal
Vehicle
Pre‐emp3on 












550,000
 23
Oakland CA Public
Safety “Grow
Our
Own”
Police
Recruitment
Program
‐
The
City
seeks
funding
to
conduct
personal
recruitment
visits,
 










1,900,000
 24
Oakland CA Public
Safety Fleet
Replacements










38,000,000
 30
Oakland CA Public
Safety Replacement
Helicopter
‐
One
helicopter
to
replace
outdated
unit
$2,500,000.

The
helicopter
unit
provides
 










2,500,000
 30
Oakland CA Public
Safety New
Mul3‐Service
Training
facility
for
Police
and
Fire
Departments 








50,000,000
 33
Oakland CA Public
Safety 311
Ci3zen
Rela3onship
Management
(CRM)
System
‐
Funding
will
provide
Oakland
ci3zens
a
non‐emergency
 










3,000,000
 36
Oakland CA Public
Safety Enhanced
Public
Safety
Equipment
Program
‐
The
City
seeks
funding
to
install
audio
and
video
recording

devices
in
patrol
and
specialized
vehicles;
purchase
firearms,
holsters,
and
related
equipment;
purchase
and

install
Dell
laptops
for
specialized
field
work. 










3,300,000
 39
Oakland CA Public
Safety Public
Safety
Informa3on
Technology
Infrastructure
Enhancement
‐
The
City
of
Oakland
requests
$3.61
million
 










3,610,000
 43
Oakland CA Public
Safety Oakland
Fire
Boat
‐
The
fireboat
responds
to
water
emergencies
and
provides
mutual
aid
assistance
to
other

jurisdic3ons.
The
Port
of
Oakland
is
a
poten3al
terrorist
target.

Opening
this
sta3on
enhances
our
capability
to

quickly
respond
to
terrorists. 










4,000,000
 48
Oakland CA Public
Safety Replacement
of
three
fire
sta3ons
 








90,000,000
 60
Oakland CA Public
Safety Surveillance
Camera
Network
‐
A
citywide
camera
system
will
be
installed
to
enhance
the
Department’s
ability

to
respond
to
criminal
ac3vity
and
inves3gate
crimes.
(OPD).

Funds
would
convert
space
in
the
Eastmont

Police
Sta3on
into
a
state
of
the
art
facility. 










5,600,000
 67
Oakland CA Public
Safety Interoperable
Communica3ons
‐
Requested
funding
will
bring
a
master
communica3ons
site
on‐line
for
the

City
of
Oakland
to
meet
P‐25
compliance,
and
will
include
simulcas3ng
and
other
features
which
will
enhance

the
communica3ons
network
capacity
 










8,000,000
 96
Oakland CA Public
Safety New
Police
Administra3on
Building,
to
replace
seismically
vulnerable
and
obsolete
Admin
Building 






450,000,000
 300
Oakland CA Streets/Roads Adeline
Street
Bridge
Repair
‐
The
improvements
include
repair
of
damages
in
abutment
No.
1
and
to
provide

access
behind
abutment
No.
2,
replace
bridge
expansion
joint
material
and
seal
and
restriping
the
bridge
deck 










2,700,000
 10
Oakland CA Streets/Roads Airport/Coliseum
Adap3ve
Traffic
Signal
System











2,200,000
 12
Oakland CA Streets/Roads MacArthur
Blvd
Streetscape
Project 










1,900,000
 20
Oakland CA Streets/Roads Traffic
Signal
Upgrades 










2,000,000
 20
Oakland CA Streets/Roads 7th
Street,
West
Oakland
Transit
Village
Streetscape
Project
‐
The
improvements
include
construc3on
of
bulb‐
outs,
ADA
ramps
and
installa3on
of
bike
lanes,
construc3on
of
medians
with
landscaping,
improvement
of

sidewalks
and
installa3on
of
streetlights 










1,230,000
 23
Oakland CA Streets/Roads The
Fruitvale
Alive
Streetscape
Project
‐
The
improvements
include
construc3on
of
bulb‐outs,
ADA
ramps
and

installa3on
of
bike
lanes,
plan3ng
trees,
installa3on
of
signs
to
improve
pedestrian
circula3on,
improvement
of

sidewalks
and
installa3on
of
streetlights. 










2,900,000
 25
Oakland CA Streets/Roads Interna3onal
Blvd
Streetscape
Project 










2,750,000
 30
Oakland CA Streets/Roads Coliseum
Pedestrian
Walkway
Seismic
Replacement 










5,000,000
 40
Oakland CA Streets/Roads Curb
Ramp
Installa3on

(approx.
6000
loca3ons)










15,000,000
 40
Oakland CA Streets/Roads Sidewalk
Damage
Repair
(8000
loca3ons) 








25,000,000
 50
Oakland CA Streets/Roads 14th
Avenue
Streetscape
Project











5,000,000
 60
Oakland CA Streets/Roads New
Municipal
Service
Center
‐
replace
exis3ng
service
center
on
leased
ground
prone
to
liquifac3on
in
seismic
 






220,000,000
 60
Oakland CA Streets/Roads Infrastructure
Improvements
to
the
Oakland
Army
Base 






100,000,000
 67
Oakland CA Streets/Roads Repair
of
Structurally
Obsolete
Bridges 








20,000,000
 100
Oakland CA Streets/Roads Street
Resurfacing
‐

(approx
170
Lane
miles)
lane
miles
of
street
resurfacing,
including
sidewalk,
curb,
gufer
 








50,000,000
 100
Oakland CA Streets/Roads 12th
Street
Reconstruc3on 










3,600,000
 250
Oakland CA Water Oakland
Inner‐Harbor
Tidal
Canal
Easement
‐
The
proposed
easement
will
allow
the
City
to
construct

Oakland CA Water Oakland
Inner‐Harbor
Tidal
Canal
Feasibility
Study
‐
The
City
of
Oakland
requests
the
authoriza3on
of
$250,000
 












250,000
 3
Oakland CA Water Waterside
Wireless
Surveillance
System,
GR5,
Phase
2 












750,000
 9
Oakland CA Water Portable,
wireless
video
cameras
for
spot
surveillance
and
alert
repor3ng 










2,450,000
 30
Oakland CA Water Cryer
Boatworks
Site,
Public
Beach
Access
‐
The
Cryer
Boatworks
Site
is
currently
being
developed
as
a
public
 










3,800,000
 45
Oakland CA Water High
Priority
Storm
Drain
System
Improvements 








70,000,000
 47
Oakland CA Water 
Design/Build
Contract
for
B60‐63
Wharf
Reconstruc3on,
APL 






130,000,000
 85
Oakland CA Water Upgrades
to
Sanitary
Sewer
System,
including
Pump
Sta3ons
to
eliminate
overflows 






130,000,000
 85
City State Program Project
Descrip3on Funding
Required Jobs
Oakland CA Water Final
Deepening
of
the
Inner
Harbor
Turning
Basin
to
‐50
Feet,
mean
Lower
Low
Water,
Port
of
Oakland 










8,000,000
 96
Oakland CA Water Clean
Water,
Safe
Parks
Program

 






150,000,000
 100
Ontario CA CDBG Veteran's
Park
Community
Center
‐
This
project
includes
a
2,500
sq
b
community
center
constructed
to
LEED

standards
and
rehabilita3on
of
a
park
and
sportsfield.
Park
improvements
include
an
addi3onal
sportsfield,
tot

lot
and
picnic
areas. 










2,500,000
 105
Ontario CA CDBG Ontario
Downtown
Plaza
‐
This
project
constructs
an
urban
plaza
consis3ng
of
an
amphitheatre,
arbor
 










3,500,000
 147
Ontario CA CDBG Guas3
Parking
Structure
‐
The
Historic
Guas3
District
project
includes
development
of
hotels,
offices,
retail

stores,
restaurants
and
entertainment
venues.

The
parking
structure
includes
750
spaces
needed
for
phase
1

of
the
project.

 








11,250,000
 472
Ontario CA CDBG Ontario
Civic
Center
Improvements
‐
This
project
includes
complete
rehabilita3on
of
the
exis3ng
City
Hall,

construc3on
of
a
new
public
parking
facility,
and
installa3on
of
equipment
for
an
Emergency
Opera3ons

Center.

The
project
implements
the
City' 








29,000,000
 1218
Ontario CA Public
Safety Emergency
Signal
Vehicle
Pre‐emp3on
Devices
at
Signalized
Intersec3ons
‐
This
project
would
install
hardware

in
Traffic
Signals
to
improve
public
safety
and
emergency
vehicle
response
3mes. 












550,000
 23
Ontario CA Streets/Roads Sidewalk
Construc3on
&
Repair
‐
This
project
would
construct
new
sidewalks
and
repair
exis3ng
ones,
at
sites

to
comply
with
ADA
standards
and
within
"Safe
Routes
to
Schools"
areas. 










1,798,000
 75
Ontario CA Streets/Roads Pavement
Rehabilita3on
‐
This
project
consist
of
pavement
rehabilita3on
on
13
miles
of
City
streets
u3lizing

rubberized
asphalt
with
waste
3re
grindings
‐
a
"Green"
project. 










3,920,000
 164
Ontario CA Streets/Roads Grove
Ave
Grade
Separa3on
‐
This
project
constructs
a
highway‐railroad
grade
separa3on
to
facilitate
goods

movement,
provide
added
safety
and
air
quality
improvements
and
improve
circula3on. 










8,400,000
 352
Ontario CA Streets/Roads Francis
Street
Storm
Drain
‐
This
project
consists
of
construc3ng
an
84"
to
132"
reinforced
concrete
pipe
and
a
 








15,000,000
 630
Ontario CA Streets/Roads North
Milliken
Ave
Grade
Separa3on
‐
This
project
constructs
a
highway‐railroad
grade
separa3on
to
facilitate

goods
movement,
provide
added
safety
and
air
quality
improvements
and
improve
circula3on
for
Ontario

Interna3onal
Airport. 








20,000,000
 840
Ontario CA Streets/Roads New
Model
Colony
Backbone
Infrastructure
‐
This
project
will
jump
start
the
construc3on
of
13,000
residen3al

units
in
Ontario
including
14
miles
of
roadway
serving
3,500
acres.

Improvements
will
consist
of
roadway

circula3on,
flood
protec3on,
etc. 






100,000,000
 4200
Ontario CA Water California
Friendly
Landscape
‐
This
project
replaces
exis3ng
turf
with
drought
tolerant
landscape
to

incorporate
water
conserva3on
in
public
medians
and
park
land
throughout
the
City. 










1,000,000
 42
Ontario CA Water Ontario
City
Well
#43
‐
This
project
includes
the
construc3on
of
a
new
Water
Well
to
increase
the
capapcity
of
 










2,265,000
 95
Ontario CA Water Chino
Desalter
Expansion
‐
This
joint,
regional
project
pumps
and
treats
polluted
groundwater,
removes
salts
 








15,000,000
 630
Ontario CA Water Mills
Creek
Wetlands
‐
The
wetlands
are
a
35
acre
site
adjacent
to
3
miles
of
recrea3onal
trails,
camping
and
 








17,000,000
 714
Ontario CA Water Recycled
Water
Service
Main
Extensions
‐
This
project
would
expand
the
recycled
water
distribu3on
system
to
 








20,100,000
 844
Palm
Desert CA CDBG Apartment
Trash
Enclosures 










2,800,000
 10
Palm
Desert CA CDBG Thirty‐six
Acre
Park 








18,000,000
 65
Palm
Desert CA CDBG Community
Aqua3cs
Center 








30,000,000
 85
Palm
Desert CA Energy Corpora3on
Yard
Solar
Panels 












500,000
 5
Palm
Desert CA Housing Sixteen‐unit
Rehabilita3on
Affordable
Housing 












500,000
 6
Palm
Desert CA Streets/Roads Alessandro
Roadway
Redevelopment 










4,500,000
 50
Palm
Desert CA Streets/Roads El
Paseo
Median
Road
Improvements 










5,000,000
 50
Palm
Desert CA Streets/Roads Monterey
Interchange
Reconfigura3on 










5,000,000
 60
Palm
Desert CA Streets/Roads North
Sphere
Drainage
Program 








15,000,000
 60
Palm
Desert CA Streets/Roads Further
Portola
Interchange 








20,000,000
 65
Palm
Desert CA Streets/Roads Portola
Avenue
Widening 








10,000,000
 85
Palm
Desert CA Transit Bus
Shelters 












200,000
 8
Pasadena CA CDBG Replacement
of
the
playgrounds
at
Sunnyslope
and
San
Rafael
Parks.

Will
use
recyclable
materials
and
wood
 












500,000
 8
Pasadena CA CDBG Replacement
of
athle3c
field
ligh3ng
at
Brookside,
Victory,
Villa
and
Jefferson
Park
fields.

Will
use
the
most

energy
efficient
ligh3ng
available. 










3,000,000
 51
Pasadena CA CDBG Robinson
Park
Community
Building
and
Gymnasium.

Silver
LEED
ra3ng. 








15,000,000
 255
Pasadena CA Energy Install
new
energy
efficient
HVAC
automa3on
system
at
the
Police
Department’s
firing
range. 














50,000
 1
Pasadena CA Energy Installa3on
of
an
energy
efficient
cool
roof
at
Fire
Sta3on
39. 












115,000
 2
Pasadena CA Energy Storm
Water
Capture
at
Power
Plants:
Capture,
store,
treat
and
use
rain
water
from
City's
two
major
storm

drains.
Treated
rain
water
will
be
used
to
supplement
make‐up
water
for
cooling
towers
and
reduce
equivalent

amount
of
potable
water
currently
used. 












250,000
 4
Pasadena CA Energy Replace
HVAC
system,
plumbing
and
gufer
system
and
repair
the
roof
at
the
Building
Maintenance
Building
at

the
City
Yards. 












282,000
 5
Pasadena CA Energy Installa3on
of
microturbine/generator
to
an
exis3ng
high
pressure
water
line
at
the
Millard
Pressure
Reducing

Sta3on.
Renewable
energy.
genera3on 












355,000
 6
Pasadena CA Energy Installa3on
of
Solar
Photovoltaic
systems
on
the
roofs
of
the
Gas
Compressor
Building
and
Pump
Shop
located

at
Pasadena's
Broadway
Power
Plant. 












900,000
 15
Pasadena CA Energy Repairs
and
upgrades
to
the
following
seven
libraries
to
increase
energy
efficiency.

Cool
roof
will
result
in

decreased
energy
usage. 










1,300,000
 22
Pasadena CA Energy Replacement
of
the
median
island
irriga3on
on
Sierra
Madre
Blvd.
Installa3on
of
the
most
energy
efficient

irriga3ons
systems
available
and
drought
tolerant
plants. 










1,300,000
 22
Pasadena CA Energy Install
new
substa3on
at
Chester. 










3,000,000
 51
Pasadena CA Public
Safety Radio
Replacement
Project:
Design
and
replace
infrastructure
and
hand‐held
radios
for
field
opera3ons
staff. 










2,500,000
 0
Pasadena CA Public
Safety Security
Upgrade:
Install
new
block
wall
at
Santa
Anita
Substa3on
to
meet
new
standards
for
Walnut
street. 












150,000
 3
Pasadena CA Public
Safety Installa3on
of
exhaust
ven3la3on
systems
at
the
following
eight
fire
sta3ons:
#31,
32,
33,
34,
36,
37,
38
and
39.













536,320
 9
Pasadena CA Public
Safety Security
Upgrade:
Install
block
wall
at
Goodrich
Substa3on. 












500,000
 9
Pasadena CA Public
Safety Earthquake
repairs
to
Fire
Sta3on
39. 










1,275,000
 20
Pasadena CA Public
Safety Seismic
Upgrade:
Retrofit
all
power
facili3es
to
withstand
major
earthquakes. 










1,500,000
 25
Pasadena CA Public
Safety Seismic
retrofit
of
the
Public
Works
Building
at
the
City
Yards.
Silver
LEED
ra3ng. 










3,400,000
 58
Pasadena CA Public
Safety Replacement
or
installa3on
of
security
lights
at
the
13
City
parks.

Will
use
the
most
energy
efficient
ligh3ng

available. 










3,750,000
 63
Pasadena CA Public
Safety Earthquake
repairs
to
Fire
Sta3on
33. 










4,275,000
 71
City State Program Project
Descrip3on Funding
Required Jobs
Pasadena CA Schools Installa3on
of
new
playgrounds
and
facility
improvements
for
school/park
sites
at
Cleveland
Elementary
School

and
Marshall
Fundamental
School.

Will
integrate
recycled
plas3c
and
rubber
for
play
equipment. 












500,000
 8
Pasadena CA Streets/Roads Installa3on
of
residen3al
street
ligh3ng
on
Daisy
from
Villa
to
Del
Vina.
LED
ligh3ng.















86,000
 1
Pasadena CA Streets/Roads Installa3on
of
residen3al
street
ligh3ng
on
Lakewood
Place.
LED
ligh3ng. 














74,000
 1
Pasadena CA Streets/Roads Installa3on
of
residen3al
street
ligh3ng
on
Morningside
from
Daisy
to
Eastern. 














50,000
 1
Pasadena CA Streets/Roads Installa3on
of
residen3al
street
ligh3ng
on
Del
Rey
from
Woodlyn
to
Washington. 












147,000
 2
Pasadena CA Streets/Roads Installa3on
of
a
traffic
signal
at
Fair
Oaks
and
Fillmore.

Traffic
signals
will
u3lize
LED
indicators. 












200,000
 3
Pasadena CA Streets/Roads Installa3on
of
a
traffic
signal
at
Mountain
and
City
Yards.

Traffic
signals
will
u3lize
LED
indicators.













200,000
 3
Pasadena CA Streets/Roads Installa3on
of
residen3al
street
ligh3ng
on
Carmelo
from
Villa
to
Lambert. 












171,000
 3
Pasadena CA Streets/Roads Installa3on
of
a
traffic
signal
at
Foothill
and
PCC/Ice
Rink
Driveway.

Traffic
signals
will
u3lize
LED
indicators. 












230,000
 4
Pasadena CA Streets/Roads Installa3on
of
a
traffic
signal
at
Chester
and
Cordova
Traffic
signals
will
u3lize
LED
indicators. 












278,000
 5
Pasadena CA Streets/Roads Bafery
back‐up
for
traffic
signal
intersec3ons
city‐wide. 












450,000
 7
Pasadena CA Streets/Roads Roadway
improvements
at
Hahamongna
Watershed
Park
for
safety
purposes
including
resurfacing,
striping
and
 










1,600,000
 27
Pasadena CA Streets/Roads Replacement
of
incandescent
traffic
signal
indicators
with
light‐emiqng
diode
(LED)
indicators. 










2,400,000
 40
Pasadena CA Streets/Roads Construc3on
of
street
improvements
on
Walnut
St.
4,500
3res
to
be
recycled
through
the
use
of
1,800
tons
of
 










2,600,000
 44
Pasadena CA Streets/Roads Construc3on
of
extension
of
Kinneloa
Avenue
from
Colorado
Blvd.
to
Foothill
Ave.
and
the
extension
of
Walnut

Street.

4,000
3res
to
be
recycled
through
the
use
of
1,600
tons
of
rubberized
asphalt.

Approximately
60
new

street
trees
will
be
planted. 










5,200,000
 88
Pasadena CA Streets/Roads Resurfacing
34
miles
of
road
on
the
select
street
system
with
rubberized
asphalt. 








15,600,000
 265
Pasadena CA Water Garfield
Well
Electrical
Upgrades.
Contract
award
pending,
clearer
communica3on
resul3ng
in
reduced

unnecessary
trips
and
improved
efficiency. 












280,000
 5
Pasadena CA Water Villa
Well
Electrical
Upgrades.

Project
is
already
udnerway. 












520,000
 9
Pasadena CA Water Rehabilita3on
of
the
Arroyo
Parkway
storm
drain
from
Del
Mar
Ave.
to
Fillmore
St. 












600,000
 10
Pasadena CA Water Sewer
capacity
upgrades
through
the
replacement
or
relief
of
exis3ng
sewer
pipes
that
are
hydraulically
 












600,000
 10
Pasadena CA Water Gloriefa
Booster
Pump
electrical
upgrades.
Will
improve
energy
efficiency
in
pumping
equipment. 










1,100,000
 20
Pasadena CA Water Jones
Booster
Pump
electrical
upgrades.

Will
improve
energy
efficiency
in
pumping
equipment. 










1,200,000
 20
Pasadena CA Water Eastside
Well
Collector
Pipleine‐Phase
1:
Increased
reliability
of
water
supply. 










4,600,000
 78
Pasadena CA Water Eastside
Well
Collector
Pipleine‐Phase
2:
Increased
reliability
of
water
supply 










6,100,000
 100
Pifsburg CA CDBG Fire
Sta3on
84:

Fire
Sta3on
and
paramedic
center
in
coopera3on
with
Contra
Costa
County
Fire
Protec3on

District. 










2,700,000
 40
Pifsburg CA CDBG California
Theater:

First
phase
restora3on
of
an
exis3ng
historic
theater
as
a
performing
arts
center
with
fixed

sea3ng. 










7,000,000
 50
Pifsburg CA CDBG Marina
Hospitality
and
Culinary
Ins3tute:

4‐story
building
in
coopera3on
with
Los
Medanos
College
for
job

training
in
hospitality
food
service
industry. 










9,500,000
 65
Pifsburg CA CDBG Enean
Theater
Community
Center:

Restora3on
of
exis3ng
theater
as
a
mul3‐use
performance
and
community

center.









15,000,000
 90
Pifsburg CA CDBG Vidrio
Teacher
Housing:

a
70
unit
mixed‐use
housing
project
to
create
a
living/learning
center
for
future
and

new
teachers
in
coopera3on
with
Los
Medanos
College
and
Pifsburg
School
District. 








22,000,000
 150
Pifsburg CA Public
Safety Gang
Enforcement/Educa3on
Team:

Hiring
and
equiping
of
officers
for
the
crea3on
of
a
dedicated
team
to

work
with
school
district
on
gang
preven3on
and
street
enforcement
ac3vi3es. 










1,800,000
 4
Pifsburg CA Streets/Roads Class
II/III
Bikeways:

Three
projects
on
exis3ng
roads
to
provide
safe
bike
routes
through
the
city.











1,250,000
 25
Pifsburg CA Streets/Roads Roadway
Expansion:
Addi3onal
lanes
on
West
Leland
Road
adjacent
to
BART
rapid
transit
sta3on. 












800,000
 25
Pleasanton CA Amtrak Construc3on
of
permanent
ACE
train
sta3on
at
Old
Bernal,
surface
parking,
landscaping,
run
off
mi3ga3on
and
 










7,000,000
 100
Pleasanton CA CDBG Fire
House
Arts
Center
Parking
Construc3on 










1,500,000
 25
Pleasanton CA CDBG American's
with
Disabili3es
Act
Compliance:
Sidewalk
and
ramp
repairs/upgrades 












500,000
 50
Pleasanton CA CDBG Aqua3c
Center
Deck
and
Pump
repairs 










1,200,000
 50
Pleasanton CA CDBG Civic
Center
ADA
accessibility
compliance
and
building
upgrades 












350,000
 100
Pleasanton CA CDBG Install
Trail
Connec3on:
580/680
undercrossing
to
connect
mul3ple
trails
and
allow
access
to
mul3ple
ci3es
 










2,600,000
 100
Pleasanton CA CDBG Library
and
City
Hall
Complex
Expansion 






170,000,000
 300
Pleasanton CA Energy Fire
House
Arts
Center
Solar
System
for
Public
Community
Building 












350,000
 25
Pleasanton CA Energy Solar
Panels
and
roof
for
Community/Senior
Center 












500,000
 25
Pleasanton CA Energy Municipal
Opera3ons
Service
Center
Solar
Panels 










1,200,000
 75
Pleasanton CA Public
Safety Police
Department
Command
Vehicle 












400,000
 5
Pleasanton CA Public
Safety Police
Department
SWAT
Team
Vehicle 












250,000
 5
Pleasanton CA Public
Safety Public
Safety
radios,
mobile
and
portable 










1,000,000
 10
Pleasanton CA Streets/Roads Bernal
Bridge:
Construct
second
Bernal
Avenue
bridge
over
the
Arroyo
Del
Valle
adjacent
to
the
exis3ng
bridge,
 










5,000,000
 100
Pleasanton CA Water Del
Valle
Parkway/Nevada
Street
Sewer
Addi3ons:
The
Del
Valle
Pkwy
Sewer
line
will
provide
relief
in
exis3ng
 












450,000
 50
Pleasanton CA Water Del
Valle
Parkway
Water
Main
Extension:
Del
Valle
Water
main
extension
will
improve
water
system
quality
 












209,000
 75
Pleasanton CA Water EALS/EARS
Pump
Sta3on 










6,300,000
 75
Pleasanton CA Water Sanitary
Sewer
Pump
Sta3on
S‐6












4,290,000
 100
Plymouth CA Streets/Roads Main
Street
Reconstruc3on 












190,000
 10
Plymouth CA Streets/Roads Storm
Drain
System
Reconstruc3on 










1,074,000
 16
Plymouth CA Streets/Roads Local
Street
Intersec3on
Safety
Improvements. 










1,896,000
 20
Plymouth CA Water Add
a
1.0
MG
water
storage
tank 










1,500,000
 14
Plymouth CA Water Phase
I
Wastewater
Treatment
Plant
Improvements 










1,500,000
 30
Rancho
Cordova CA CDBG Rancho
Cordova
Children's
Museum.

Conversion
of
a
City‐owned
office
building
to
a
museum
that
will
be
used

for
K‐8
students,
and
will
feature
rota3ng
displays
on
many
subjects.

Total
Project
Cost:

$2,000,000. 










1,500,000
 200
Rancho
Cordova CA Streets/Roads White
Rock
Neighborhood
Pedestrian
Safety
Improvement
Project.

Improvements
include
ADA
accessible

ramps,
sidewalk
repairs,
traffic
calming
measures,
and
bicycle
lanes
where
possible.

Total
Project
Cost:


$1,100,000. 












800,000
 300
City State Program Project
Descrip3on Funding
Required Jobs
Rancho
Cordova CA Streets/Roads Douglas
Road
Improvements.

The
project
will
widen
Douglas
Rd
to
five‐lanes
from
Rancho
Cordova
Pkwy
to

Americanos
Blvd
and
construct
intersec3on
improvements
at
Rancho
Cordova
Pkwy
and
Americanos
Blvd.




Total
Project
Cost:

$15,000,000. 








12,000,000
 500
Rancho
Cordova CA Streets/Roads Interna3onal
Drive
Extension
and
Bridge
over
the
Folsom
South
Canal.

Federal
funds
are
requested
to
mi3gate

a
federally‐owned
obstruc3on
that
restricts
access
to
job
centers,
educa3on,
shopping,
and
public
transit.


Total
Project
Cost:

$17,000,000. 










8,600,000
 500
Rancho
Cordova CA Streets/Roads Road
Rehabilita3on
Projects
to
include
asphalt
overlay
on
several
Coloma
Rd,
McGregor
Dr,
Laurelhurst
Dr,
Old
 








20,000,000
 500
Rancho
Cordova CA Streets/Roads White
Rock
Road
Improvements,
Sunrise
to
City
Limits
Project.

Request
for
improvements,
widening,
and
new
 










6,000,000
 500
Rancho
Cordova CA Streets/Roads Sunrise
Boulevard
Improvements.

Widening
of
Sunrise
Blvd
to
4
lanes
with
intersec3on
improvements
and
the
 








11,000,000
 600
Redding CA CDBG Construc3on
of
a
new
policy
facility
to
replace
aging,
cramped
building. 








41,900,000
 145
Redding CA CDBG Infrastructure
elements
of
S3llwater
Business
Park
 








42,500,000
 354
Redding CA Streets/Roads Parkview
Avenue
Improvements
‐
Striping
Modifica3on
and
Crosswalk
Addi3on 












425,000
 4
Redding CA Streets/Roads Signalize
Intersec3on
‐
Shasta
View
and
Rancho
Road 












450,000
 5
Redding CA Streets/Roads Signalize
Intersec3on
‐
Three
Leg
Intersec3on
at
Court
Street/Eleventh
Street 












325,000
 5
Redding CA Streets/Roads Signalize
Intersec3on
‐
Three
Leg
Intersec3on
at
Old
Alturas
Rd./Victor
Ave. 












325,000
 5
Redding CA Streets/Roads Browning
Street
Widening
Project
‐
Churn
Creek
Road
to
Gabriel
Court 












450,000
 8
Redding CA Streets/Roads Buenaventura
Blvd.
Shoulder
Widening/Bike
Lanes
‐
Lakeside
to
Placer 












355,000
 9
Redding CA Streets/Roads Hilltop
Drive
Widening
‐
Interstate
5
to
Lake
Blvd 










1,400,000
 19
Redding CA Streets/Roads Roadway
Overlays
and
Seals
‐
Various
Areas 










5,000,000
 56
Redding CA Streets/Roads Extend
Shasta
View
Drive
from
Rancho
Road
to
Airport
Road. 










4,000,000
 100
Redding CA Water 24"
water
line
and
new
well
‐
Shasta
View
Drive
to
Rancho
Road
 










2,000,000
 33
Redding CA Water S3llwater
WWTP
ouzall
diffuser
project 










2,000,000
 33
Redding CA Water S3llwater
WWTP
expansion 










5,000,000
 35
Redding CA Water Boulder
Creek
wastewater
interceptor 










4,500,000
 38
Redding CA Water Mary
Street
lib
sta3on/force
main 










3,600,000
 45
Redding CA Water Oasis
Road
water
line 










8,300,000
 104
Redlands CA CDBG Safety
Hall
Replacement
Project
‐
Funds
the
acquisi3on
of
property,
design
and
construc3on
of
a
replacement
 








45,000,000

Redlands CA Energy City
Facility
HVAC
Replacement
Project
–
Replaces
the
City’s
energy
inefficient
hea3ng,
ven3la3on
and
air
 










1,000,000

Redlands CA Public
Safety Crime
Control
Research
Program
–
Imbeds
a
criminologist
in
the
Redlands
Police
Department,
which
will
 












500,000

Redlands CA Streets/Roads Acquire
rights‐of‐way
and
widen
Church
Street
from
Clark
Street
to
Colton
Avenue. 










2,500,000

Redlands CA Streets/Roads California
St/Redlands
Blvd
Improvements
‐
Realign
and
widen
California
St
at
Redlands
Blvd
intersec3on
to

eliminate
offset
intersec3on,
install
new
traffic
signal
and
construct
storm
drain
structure
to
convey
100‐year

storm
flow. 










5,800,000

Redlands CA Streets/Roads Redlands,
Alabama,
Colton
Improvement
Project
‐
Phase
1
‐
Acquire
rights‐of‐way
and
widen
Redlands
Blvd
at
 










4,000,000

Redlands CA Streets/Roads Redlands,
Alabama,
Colton
Improvement
Project
‐
Phase
2
‐
Acquire
rights‐of‐way
and
widen
Redlands
Blvd.
at

Alabama
Street
and
widen
and
realign
Alabama
Street
at
Redlands
Blvd. 










8,000,000

Redlands CA Streets/Roads Street
Maintenance
Project
‐
Grind
and
resurface
various
streets
within
the
City
to
extend
useful
life
of
streets.











2,000,000

Redlands CA Streets/Roads Traffic
signal
installa3on
at
intersec3ons
of
Stuart
Ave
and
Eureka
St;
at
Eureka
St
and
Colton
Ave;
6th
St
at
 










2,000,000

Redlands CA Water Downtown
Storm
Drain
Replacement
Project
‐
Encourages
Downtown
Redlands’
economic
development
by
 










8,000,000

Redlands CA Water Recycled
Water
Project
‐
expansion
of
exis3ng
system
including
construc3on
of
two
reservoirs,
a
pump
sta3on
 










7,300,000

Redondo
Beach CA CDBG California
Coastal
Trail
&
Bikeway
Improvements 










3,000,000

Redondo
Beach CA CDBG Harbor
Patrol
Building 










2,000,000

Redondo
Beach CA CDBG North
Branch
Library 










5,000,000

Redondo
Beach CA CDBG Regional
Transit
Center 










4,000,000

Redondo
Beach CA CDBG Seaside
Lagoon
Rehabilita3on 








10,000,000

Redondo
Beach CA CDBG Wilderness
Park
Reforesta3on
 










1,000,000

Redondo
Beach CA Energy Greening
of
North
Branch
Library
 










2,000,000

Redondo
Beach CA Public
Safety Emergency
Opera3ons
Center
Upgrades 












500,000

Redondo
Beach CA Transit Bus
Stop
Improvements 










1,200,000

Redondo
Beach CA Transit CNG
Bus
Purchases 










1,800,000

Redondo
Beach CA Transit CNG
Refueling
Sta3on 












600,000

Redondo
Beach CA Water Harbor
Area
Catch
Basin
Inserts
‐
Pilot
Program 












250,000

Redondo
Beach CA Water Harbor
Trash
Skimmer
‐
Pilot
Project 












500,000

Redondo
Beach CA Water Pier
Roof
Gufer
Diversion
Project 












250,000

Redondo
Beach CA Water Wet
Weather
Bacterial
TMDL
‐
Alta
Vista
Diversion
and
Re‐use
Project 










2,250,000

Rialto CA CDBG Code
Enforcement
Project 












250,000
 2
Rialto CA CDBG Curb/Gufer
and
Sidewalk
Improvement
Project 










1,000,000
 6
Rialto CA CDBG Install
Pre‐Fabricated
Restroom
Facili3es
at
City
Parks 










2,000,000
 6
Rialto CA CDBG Kris3na
Dana
Hendrickson
Cultural
Center
/
Museum
Rehabilita3on
&
Improvements 










1,060,000
 6
Rialto CA CDBG Street
Widening
and
Improvement
Project 










2,000,000
 10
Rialto CA Public
Safety Hire
five
(5)
Police
Officers
and
provide
equipment
for
these
Officers 












750,000
 5
Rialto CA Water Digester
Cover
Demoli3on
Project 












100,000
 2
Rialto CA Water Sewer
Lib
Sta3on
Replacement
Project 












180,000
 2
Riverside CA Airport North
Side
Taxiway 










5,000,000
 17
Riverside CA Energy Retrofit
and
redesign
all
Riverside
Public
U3li3es
office
loca3ons
for
op3mal
energy
efficiency 












250,000
 10
Riverside CA Energy Photovoltaic
Installa3on
at
the
Riverside
Conven3on
Center 










1,000,000
 20
Riverside CA Energy Prepare
incen3ve
rate
structure
and
deploy
technology
for
air
condi3oning
cycling
during
summer
peak
period 










2,000,000
 20
Riverside CA Energy Thermal
energy
storage‐
procure
thermal
energy
storage
technology
for
commercial
demand
response
system
 










4,000,000
 205
Riverside CA Housing Indiana
4‐Plexes
Rehabilita3on
Project 










3,500,000
 120
Riverside CA Streets/Roads Van
Buren
Boulevard
Widening
‐
Santa
Ana
River
to
Jackson
Street 










5,000,000
 8
Riverside CA Streets/Roads Arterial
Streets
Rehabilita3on 








15,000,000
 23
Riverside CA Water Recycled
Water
Distribu3on
System
Phase
1 








30,622,000
 30
Riverside CA Water Techite
Pipe
Cross
Town
Feeder
Replacement 








48,000,000
 30
Riverside CA Water The
San
Bernardino
Water
Transmission
System 








23,000,000
 30
Riverside CA Water Water
Distribu3on
Main
Replacement
Project 








15,000,000
 45
Riverside CA Water The
Linden
and
Evans
Reservoirs
Replacement
project 






135,000,000
 60
Sacramento CA Airport Execu3ve
Airport 










5,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Sacramento CA Amtrak Railyards
Tunnel
/
Connec3on
to
Old
Sac 






750,000,000
 15
Sacramento CA CDBG Tes3ng
and
Remedia3on
of
Lot
X 










1,000,000
 15
Sacramento CA CDBG Promenade
Phase
1 










3,500,000
 35
Sacramento CA CDBG RT
DNA
Line
Minimum
Opera3ng
Segment
1 








20,000,000
 75
Sacramento CA CDBG K
Street
Streetscape/
St.
Rose
of
Lima
Park/
New
Light
Rail
Stop
‐
assuming
we
could
do
two
blocks
7th‐
9th 










7,000,000
 80
Sacramento CA CDBG Extension
of
5th
Street
(Railyards
Blvd.
to
Richards.
Blvd.) 








47,000,000
 150
Sacramento CA CDBG Ramona
Street
Extension
Transporta3on 








10,000,000
 220
Sacramento CA CDBG Florin
Road 










5,000,000
 250
Sacramento CA CDBG K
Street
Street
Scape
Project 








14,500,000
 290
Sacramento CA CDBG 65th
Street
Sta3on
Reloca3on 








10,000,000
 300
Sacramento CA CDBG Army
Depot 










5,000,000
 500
Sacramento CA CDBG Mainline
Rail
Track
Reloca3on 








47,500,000
 500
Sacramento CA CDBG Raley
Blvd.
Magpie
Creek
Flood
Protec3on 








12,500,000
 1000
Sacramento CA CDBG Natomas
Flood
Control
Levee
Improvements 






200,000,000
 3000
Sacramento CA Energy 1st
Phase
of
City
developing,
implemen3ng
and
installing
5MW
of
solar
power
on
12
City
buildings 












850,000
 100
Sacramento CA Housing SHRA 






500,000,000
 100
Sacramento CA Public
Safety Fire
sta3on
and
equipment 






150,000,000
 50
Sacramento CA Public
Safety Police
sta3on
and
equipment 






100,000,000
 100
Sacramento CA Schools Hiram
Walker 








20,000,000
 20
Sacramento CA Schools Luther
Burbank 








55,000,000
 50
Sacramento CA Streets/Roads I
Street
Bridge
Pedestrian
Loop
Improvements 








10,000,000
 75
Sacramento CA Streets/Roads Point
West/Central
City
Transit
Solu3on 








50,000,000
 150
Sacramento CA Streets/Roads American
River
Mul3‐use
Bridge
(Richards
to
Truxel) 






100,100,000
 200
Sacramento CA Streets/Roads Richards
Blvd/I‐5
Interchange
Reconstruc3on 






100,000,000
 250
Sacramento CA Streets/Roads Capital
City
Freeway
Improvements/Conges3on
Mi3ga3on
‐
Midtown‐Howe
Avenue 






200,000,000
 300
Sacramento CA Streets/Roads Intermodal
Transit
Facility 






100,000,000
 300
Sacramento CA Water Central
City
Combined
Sewer
Improvements 








50,000,000
 100
Sacramento CA Water Reloca3on
of
Pioneer
Reservoir 








80,000,000
 250
Sacramento CA Water Folsom
Dam
Raise
and
Early
Release
Improvements 






150,000,000
 350
San
Bernardino CA Airport East
Annex
Hanger
Upgrades
for
Heavy
Aircrab
Maintenance
Area
at
San
Bernardino
Interna3onal
Airport 










8,000,000
 53
San
Bernardino CA CDBG Energy
Efficiency
and
Upgrades
of
Ligh3ng
at
City
Facili3es 












920,000
 6
San
Bernardino CA CDBG Improvements
at
City
Parks:

two
splash
park
installa3ons,
ADA
restroom
compliance;
one
skate
park
 










1,130,000
 7
San
Bernardino CA CDBG Parking
Lot
Sealing
and
Striping
at
City
Owned
Parking
Facili3es 










1,729,000
 11
San
Bernardino CA CDBG Roof
Restora3on,
Carpe3ng,
ADA
Restroom
Upgrades
at
Rowe
and
Villasenor
Libraries 










1,600,000
 11
San
Bernardino CA CDBG Rennova3on
of
Sturges
Center
for
the
Fine
Arts 










2,500,000
 16
San
Bernardino CA CDBG Upgrade
8ea
Series
Street
Light
Circuits 










3,400,000
 22
San
Bernardino CA CDBG New
City
Animal
Shelter
Facility 










5,000,000
 33
San
Bernardino CA CDBG Construc3on
of
New
Fire
Sta3on,
Construc3on
of
New
Fire
Fleet
Facility,
and
Repair
and
Rehabilita3on
of
 










8,614,000
 58
San
Bernardino CA CDBG New
Community
Center
in
Verdemont 








16,500,000
 110
San
Bernardino CA CDBG City
Hall
and
Parking
Structure
Seismic
Retrofit
and
Rennova3on 








22,000,000
 146
San
Bernardino CA Energy Solar
Panel
Energy
Project
on
City
Hall
Parking
Structure 










6,000,000
 40
San
Bernardino CA Schools Reloca3on
and
Construc3on
of
Administra3ve
Annex
Building
for
San
Bernardino
City
Unified
School
District
 








42,000,000
 280
San
Bernardino CA Streets/Roads Street
realignment,
and
construc3on
of
curbs,
gufers,
and
sidewalks
for
city
projects
on
Viaduct
Blvd.,
4th
&
 










7,012,700
 47
San
Bernardino CA Streets/Roads Third
Street
and
Fibh
Street
aterial
roadway,
drainage,
and
infrastructure
improvements
(from
Tippecanoe
 










9,000,000
 60
San
Bernardino CA Streets/Roads Mountain
View
Avenue
Bridge
Project
(Central
Avenue
south
to
I‐10),
including
reconstruc3on
and
expansion
 








12,000,000
 80
San
Bernardino CA Streets/Roads Local
Street
&
Public
Alley
Improvement
Projects:

street
reconstruc3on
and
repair;
bridge
repair;
ADA
 








12,950,000
 86
San
Bernardino CA Transit sbX
Bus
Rapid
Transit
Project
‐
Addi3onal
Funds
to
Complete
Project
and
Provide
Addi3onal
Center
Running
 








16,000,000
 106
San
Bernardino CA Transit Metrolink
Line
Extension
and
Plazorm
Reloca3on
to
San
Bernardino
Downtown
Transit
Center 








70,000,000
 466
San
Bernardino CA Transit Construc3on
of
San
Bernardino
Downtown
Transit
Center 






125,000,000
 833
San
Bernardino CA Transit Light
Rail
Service
from
San
Bernardino
to
Redlands 






223,000,000
 1486
San
Bernardino CA Water Storm
Drain
Repairs 










1,000,000
 7
San
Bernardino CA Water Sewer
Line
Reloca3on
and
Rescontruc3on
for
New
State
Courthouse 










2,500,000
 17
San
Bernardino CA Water Sewer
Main
Replacements 










6,000,000
 40
San
Bernardino CA Water City
Water
U3lity
Improvements:
1
new
well,
2
reservoir
retrofits,
6
well
rehabilita3ons,
6,500
b.
of
 










6,635,000
 44
San
Bernardino CA Water City
Reclama3on
Plant
Projects:
digester
gas
treatment
system;
3
new
generators;

congenera3on
system
 










7,277,000
 48
San
Bruno CA Housing Grant
for
low‐
income
housholds
for
safety
improvements
and
repairs 












500,000
 7
San
Bruno CA Public
Safety School
Resource
Officer
to
provide
DARE
and
other
drug/gang
deterrent
programs
at
Intermediate
and
 












900,000
 14
San
Bruno CA Streets/Roads Downtown
Clean
Sidewalk
Equipment
and
Program 








24,290,000
 365
San
Bruno CA Transit San
Bruno
Caltrain
Grade
Separa3on
–
Gateway
Enhancements
and
Facility
Beferment
Project 








75,000,000
 1125
San
Bruno CA Water Pump
Sta3on
No
4
College
Replacement;
Mas3c
Ave
Main
Replacement;
N.
Water
Pump
Security;
Sneath
 








20,517,000
 307
San
Diego CA Streets/Roads 40th
St.
Promenade‐Mid
City
Urban
Trails
‐
ped
&
bike
path 












375,000

San
Diego CA Streets/Roads 43rd
St.
Widening/Logan
to
I‐805
realigning
the
intersec3on 










5,038,425

San
Diego CA Streets/Roads 46th
Street/Maple
‐
Slope
restora3on 












250,000

San
Diego CA Streets/Roads 47th
St
&
Thorn
Street
‐
street
light
installa3on 














84,000

San
Diego CA Streets/Roads 6th
Ave
Storm
Drain
‐
replace
300
linear
b
of
CMP 












700,000

San
Diego CA Streets/Roads Asian
Pacific
Thema3c
Historic
District
Improvements 










2,500,000

San
Diego CA Streets/Roads Azalea
Park
Neighborhood
‐
landscape
median 












559,048

San
Diego CA Streets/Roads BAayside
Walk
&
West
MB
Drive
Traffic
Signal 












109,000

San
Diego CA Streets/Roads Birdrock
Elementary
‐
ADA
Upgrades
(sidewalks) 












300,000

San
Diego CA Streets/Roads Carroll
Canyon
Rd
‐
extend
Carroll
Canyon
Rd
from
Scranton
(under
I‐805)
to
Sorrento
Vly
Rd 








12,000,000

San
Diego CA Streets/Roads Central
ES
‐
sidewalks,
ped
signals 












250,040

San
Diego CA Streets/Roads Cherokee
Traffic
Calming
‐
Mid
City 












330,000

San
Diego CA Streets/Roads Community
Plan
Traffic
Mi3ga3on 












150,000

San
Diego CA Streets/Roads Condi3on
Assessment
of
Street
Network 












500,000

San
Diego CA Streets/Roads Cortez
District
Street
Lights
‐
Phase
2 










1,800,000

San
Diego CA Streets/Roads Cortez
District
Street
Lights
‐
Phase
I 










1,600,000

City State Program Project
Descrip3on Funding
Required Jobs
San
Diego CA Streets/Roads Curb
ramps
at
various
loca3ons 










1,000,000

San
Diego CA Streets/Roads Curb
Ramps
at
various
loca3ons 










1,500,000

San
Diego CA Streets/Roads Dalbergia
&
Thorn
Lot
Infiltra3on 












201,590

San
Diego CA Streets/Roads Date
Street
Storm
Drain
(Kefner
to
California
Streets) 












371,000

San
Diego CA Streets/Roads Downtown
Quiet
Zone 








20,000,000

San
Diego CA Streets/Roads Fibh
and
Broadway
Traffic
Signal 












250,000

San
Diego CA Streets/Roads Friars/Pac
Hwy
Bike
Path 












450,000

San
Diego CA Streets/Roads Front
&
Cedar
‐
Traffic
Signal
and
Popouts 












380,000

San
Diego CA Streets/Roads Green
Street
‐
Mt
Abernathy
Drive
Infiltra3on 










1,318,288

San
Diego CA Streets/Roads I‐5
Bridge(s)
Street
Lights 












800,000

San
Diego CA Streets/Roads Ingulf
Place
Storm
Drain
‐
replace
36"
RCP
pipe 












190,000

San
Diego CA Streets/Roads Island
Popouts
Phase
II
and
Sidewalk
Gaps
Project 










1,400,000

San
Diego CA Streets/Roads Keighley
Court
Storm
Drain 














57,000

San
Diego CA Streets/Roads Kellogg
Park
Green
Lot
Infiltra3on 












920,000

San
Diego CA Streets/Roads Kensington
Manor
1
Street
Light
Circuit 












300,000

San
Diego CA Streets/Roads La
Jolla
Ecological
Rese4rve
ASBS 












451,331

San
Diego CA Streets/Roads La
Jolla
Village
Drive/I‐805
Interchange 








21,000,000

San
Diego CA Streets/Roads La
Jolla
Village
to
Rgents
Road
‐
Construct
a
right‐turn
lane 












735,000

San
Diego CA Streets/Roads La
Playa
Storm
Drain 














80,000

San
Diego CA Streets/Roads Lifle
Italy
District
Street
Lights 










1,730,000

San
Diego CA Streets/Roads Lifle
Italy
Public
Improvements
‐
PH
2
(sidewalks,
signs,
landscaping) 










1,600,000

San
Diego CA Streets/Roads Market
and
Ninth
Traffic
Signal 












240,000

San
Diego CA Streets/Roads Market
and
Third
Traffic
Signal
and
Popouts 












368,000

San
Diego CA Streets/Roads Market
and
Union
Traffic
Signal 












240,000

San
Diego CA Streets/Roads Memorial
Park
Infiltra3on 












185,250

San
Diego CA Streets/Roads North
Embarcadero
Visionary
Plan
Phase
I
‐
West
Broadway 










7,800,000

San
Diego CA Streets/Roads Otay
Truck
Rt.
Widening
PH
III 










2,414,000

San
Diego CA Streets/Roads Overlay
of
Various
Streets
Citywide
‐
10
miles 










5,000,000

San
Diego CA Streets/Roads Overlay
of
Various
Streets
Citywide
‐
35
miles 








17,500,000

San
Diego CA Streets/Roads Pacific
Beach
3
Street
Light
Series
Circuit
Conversion 












800,000

San
Diego CA Streets/Roads Pacific
Beach
4
Street
Light
Series
Circuit
Conversion 










1,000,000

San
Diego CA Streets/Roads Pacific
Beach
6
Street
Light
Series
Circuit
Conversion 










1,000,000

San
Diego CA Streets/Roads Pacific
Beach
7
Street
Light
Series
Circuit
Conversion 










1,000,000

San
Diego CA Streets/Roads Park
and
Island
Traffic
Signal 












267,000

San
Diego CA Streets/Roads Park
and
J
Traffic
Signal 












267,000

San
Diego CA Streets/Roads Park
Boulevard
&
Harbor
Drive
At‐Grade
Crossing
Improvements 








12,900,000

San
Diego CA Streets/Roads Potomac
Street
‐
sidewalk
improvements 












214,000

San
Diego CA Streets/Roads Ransom
&
Darwin
Storm
Drain
‐
replace
1100
linear
b
of
CMP 












542,000

San
Diego CA Streets/Roads Reconstruc3on
of
Concrete
Streets
‐
Florida
St. 










3,200,000

San
Diego CA Streets/Roads Reconstruc3on
of
Concrete
Streets
‐
Juan
St. 










4,500,000

San
Diego CA Streets/Roads Regents
Rd
Widening
from
Genesee 










4,000,000

San
Diego CA Streets/Roads Repair
various
concrete
streets
(Isolated
Panels)
‐
Citywide 










2,200,000

San
Diego CA Streets/Roads Replacement
of
Barrier
Rail
on
Barnef
Avenue
Bridge 












420,000

San
Diego CA Streets/Roads Rose
Creek
Bike
Path 










3,500,000

San
Diego CA Streets/Roads Rowena
Street
Storm
Drain
‐
Install
permanent
fix
line 










1,000,000

San
Diego CA Streets/Roads San
Fernando
to
Ventura
Walk
Repair 










2,000,000

San
Diego CA Streets/Roads Scripps
Ranch
Blvd
‐
Scripp
Lake
Drive
(install
raised
median) 












730,805

San
Diego CA Streets/Roads Shoal
Creek
Ped
Bridge
PH
I
‐
construct
a
ped
bridge 










3,500,000

San
Diego CA Streets/Roads Sidewalk
Replacement
Various
Loca3ons
city
Wide 










1,200,000

San
Diego CA Streets/Roads Sidewalk
Replacement
Various
Loca3ons
City
Wide
(Tree
Related) 










3,500,000

San
Diego CA Streets/Roads Sidewalk
replacement
Various
Loca3ons
Citywide
(Tree
related) 










3,000,000

San
Diego CA Streets/Roads Sidewalk
Replacement
Various
Loca3ons
Citywide
(Tree
related) 










8,500,000

San
Diego CA Streets/Roads Sidewalks
at
various
loca3ons 










2,352,000

San
Diego CA Streets/Roads Simon
Levi
Building
Sidewalks 












264,000

San
Diego CA Streets/Roads Skyline
Drive
Median
&
Parkway
Improvements 










1,323,027

San
Diego CA Streets/Roads Slurry
Seal
of
Variaous
Streets
Citywide
‐
100
miles 








10,000,000

San
Diego CA Streets/Roads Slurry
Seal
of
Various
Streets
Citywide
‐
100
miles 








11,000,000

San
Diego CA Streets/Roads Slurry
Seal
of
Various
Streets
Citywide
‐
25
miles 










2,500,000

San
Diego CA Streets/Roads SR15
Bikeway 












175,000

San
Diego CA Streets/Roads Street
Lights
in
urbanized
communi3es 










1,092,738

San
Diego CA Streets/Roads Sunset
Cliffs
3
Street
Lights
Series
Circuit
Conversion 










1,000,000

San
Diego CA Streets/Roads Talmadge
1
Street
Light
Series
Circuit
Conversion 










1,000,000

San
Diego CA Streets/Roads Talmadge
4
Street
Light
Series
Circuit
Conversion 












500,000

San
Diego CA Streets/Roads Thorn
Street
‐
median
improvements 












276,000

San
Diego CA Streets/Roads Traffic
Signals
at
various
loca3ons 










1,000,000

San
Diego CA Streets/Roads University
Ave
Front
St
‐
popouts 














90,000

San
Diego CA Streets/Roads Via
Rialto
Drive
Storm
Drain 












800,000

San
Diego CA Streets/Roads Wenrich
Drive
Storm
Drain 














45,000

San
Diego CA Streets/Roads West
Point
Loma
Blvd
Sidewalk
Improvements 












251,000

San
Diego CA Streets/Roads Willow
ES
‐
street
lights,
ped
3mers 












369,000

San
Diego CA Transit Bus
Pads 












500,000

San
Diego CA Transit Transporta3on
Mul3‐Modal
Opera3on
Center 








10,000,000

San
Diego CA Water 3010
‐
Wtr
GJ
717
CI
(OB1) 










1,308,800

San
Diego CA Water 3010
‐
Wtr
GJ
718A
CI
(OB2) 










2,100,800

San
Diego CA Water 43rd
St.
&
Na3onal
Ave.
Realignment 












325,456

San
Diego CA Water 43rd
St.
&
Na3onal
Ave.
Realignment 












532,208

San
Diego CA Water 54th
Street 












294,341

San
Diego CA Water 6300
Alvarado
Channel
Pipe
Crossing 












451,440

City State Program Project
Descrip3on Funding
Required Jobs
San
Diego CA Water Alvaarado
WTP
Phase
3
Rehab
Floc
Sed
Basin 








23,141,002

San
Diego CA Water Buchanan
Canyon
Sewer
B
(UP) 










2,276,233

San
Diego CA Water Carmel
Valley
Recycled
Waterline 










5,110,000

San
Diego CA Water East
Point
Loma
TS
12/11
EPAPW 










9,780,000

San
Diego CA Water Famosa
Accel
‐

Sewer
&
Water 










2,964,508

San
Diego CA Water Famosa
Accel
‐
Sewer
&
Water 










3,292,893

San
Diego CA Water Lake
Murray
In
Canyon
Trunk
Sewer
12/11
EP 








16,819,782

San
Diego CA Water Los
Penasquitos
Recycle
Waterline 










3,570,000

San
Diego CA Water Mission
Bay
Sewage
Interceptor
System














198,937

San
Diego CA Water Mission
Center
Canyon
Sewer
B 












256,200

San
Diego CA Water Pacific
Highway
TS
08/12
EPA 










5,081,698

San
Diego CA Water PS
Group
I
‐
North
County
SPS
Upgrades 










4,583,600

San
Diego CA Water PS
Group
II
‐
Citywide
SPS 










2,936,500

San
Diego CA Water Quincy
Street
&
Wilbur
Ave. 










1,426,210

San
Diego CA Water Sewer
&
Water
Group
716
(LJ3)
(02) 












387,652

San
Diego CA Water Sewer
&
Water
Group
716
(LJ3)
(02) 










3,143,174

San
Diego CA Water Sewer
&
Water
Group
766
(OT) 












132,984

San
Diego CA Water Sewer
&
Water
Group
766
(OT) 










2,244,000

San
Diego CA Water Sewer
&
Water
Group
772
(KE)














140,784

San
Diego CA Water Sewer
&
Water
Group
772
(KE) 










2,278,140

San
Diego CA Water Sewer
&
Water
Group
785
Canyon
(CM) 












580,000

San
Diego CA Water Sewer
&
Water
Group
785
Canyon
(CM) 












697,095

San
Diego CA Water Sewer
&
Water
Group
829
(CH) 












238,000

San
Diego CA Water Sewer
&
Water
Group
829
(CH) 












988,669

San
Diego CA Water Sewer
Group
697A
(SE)













791,267

San
Diego CA Water Sewer
Group
698
(BL3)
(04) 










6,201,120

San
Diego CA Water Sewer
Group
703
(KE1)
(03) 










3,093,000

San
Diego CA Water Sewer
Group
715
(LJ2)
(04) 










2,720,973

San
Diego CA Water Sewer
Group
725
(CA4)
(02) 










1,680,172

San
Diego CA Water Sewer
PS
27
Phase
II














867,000

San
Diego CA Water Sunset
Cliffs
TS
07/12
EPA 










4,267,157

San
Diego CA Water Water
&
Sewer
Group
544
(OB101) 










1,094,500

San
Diego CA Water Water
&
Sewer
Group
544
(OB101) 










2,055,133

San
Diego CA Water Water
Group
773
(CA2) 












771,000

San
Diego CA Water Water
Group
790 










7,094,734

San
Diego CA Water Water
Group
793
(SE) 










4,246,000

San
Francisco CA Airport Runway
Overlay
and
Reconstruc3on 










4,000,000
 25
San
Francisco CA Airport Terminal
Seismic
Upgrades 










9,000,000
 50
San
Francisco CA CDBG Moscone
Conven3on
Center
Improvements
and
Expansion.
Tourism
is
San
Francisco's
largest
industry
and
the
 








11,000,000
 600
San
Francisco CA CDBG Hunters
Point
Shipyard/Candles3ck/Huntersview.
The
redevelopment
of
this
community
is
a
top
priority
for
 








30,000,000
 1000
San
Francisco CA CDBG Port
of
San
Francisco
Infrastructure
projects 






130,000,000
 1283
San
Francisco CA CDBG Transbay
Highspeed
Rail
Terminus

a
new
mul3
modal
center
will
be
the
Grand
Central
Sta3on
of
the
West
 






200,000,000
 1500
San
Francisco CA Energy San
Francisco
Energy
Efficient
Streetligh3ng
Demonstra3on
Ask: 












900,000
 4
San
Francisco CA Energy Energy
Efficiency
Small
Facili3es:
General
Fund
Department
Energy
Efficiency
Assessment
–
Small
Facili3es
Ask:
 










1,000,000
 10
San
Francisco CA Energy San
Francisco
Solar
Project:

Ra3onale:
San
Francisco
has
successfully
installed
2
MW
of
solar
photovoltaic
 










4,000,000
 15
San
Francisco CA Energy Energy
Efficiency
Large
Facili3es:

General
Fund
Department
Energy
Efficiency
Improvements
 








10,000,000
 100
San
Francisco CA Energy Municipal
Officie
Building
Development
‐‐LEED
Pla3num
250,000
sf
12
story
building
ready
to
go 








50,000,000
 500
San
Francisco CA Public
Safety The
Bay
Area
Regional
Interoperable
Comminica3ons
System
(BayRICS)
is
a
state
of
the
art,
standards‐based
 








25,000,000
 250
San
Francisco CA Streets/Roads Street
resurfacing
and
Curb
Ramps
to
address
the
$450
million
resurfacing
backlog
and
accelerater
ADA
 








20,000,000
 74
San
Francisco CA Streets/Roads Doyle
Drive
Reconstruc3on.
Doyle
Drive
is
the
south
Access
to
the
Golden
Gate
Bridge
and
was
built
in
1936.

 






100,000,000
 500
San
Francisco CA Transit Woods
Maintenance
Facility
Libs‐Replace
exis3ng
in‐ground
and
parallelogram.
Libs
are
necessary
for
the
 












600,000
 10
San
Francisco CA Transit Automa3c
Passenger
Counters‐RailInstall
APC's
in
30%
of
the
rail
vehicles
(60
units). 










2,000,000
 50
San
Francisco CA Transit Central
Control
&
Communica3ons
Facility
RehabThis
segment
of
the
project
is
to
replace
major
facility
and
 










1,786,000
 50
San
Francisco CA Transit Central
Control
&
Communica3ons
Interim
Line
Management
Center.this
segment
of
the
project
is
to
plan,
 












378,000
 50
San
Francisco CA Transit Central
Control
&
Communica3ons
This
segment
of
the
project
is
to
select
a
site,
design,
engineer,
and
 










1,096,000
 50
San
Francisco CA Transit Drive
Cam
Installa3on
Safety
device
for
revenue
vehicles
to
record
any
unsafe
ac3on
of
the
operator.

Installs
 










2,000,000
 50
San
Francisco CA Transit Neoplan
Motor
coach
Midlife
Overhaul
Overhaul
propulsion,
cooling,
brakes,
air,
doors
and
body
systems
on
 








26,000,000
 50
San
Francisco CA Transit Repair
of
9
Breda
LRV's
Restore
/
rebuild
up
to
9
accident‐damaged
LRV's
to
improve
current
vehicle
availability
 








26,000,000
 50
San
Francisco CA Transit Transit
Effec3veness
Project
(TEP)First
year
projects
include
major
terminal
improvements,
operator
restrooms,
 










5,000,000
 50
San
Francisco CA Transit Breda
LRV
Midlife
OverhaulMaintain/improve
current
vehicle
availability
and
reduce
unscheduled
failures,
and
 






275,000,000
 200
San
Francisco CA Transit SFgo
Traffic
Signal
Controllers
and
Transit
Priority
Replace
up
to
800
signal
controllers
that
are
obsolete
and
at
 








54,000,000
 500
San
Francisco CA Water Water
System
Improvement
Program
(WSIP)
Tesla
Facility;
Ra3onale:
 










8,000,000
 60
San
Francisco CA Water Civic
Center
Sustainable
District;
Sustainable
Civic
Center
Project
Ask: 










8,000,000
 75
San
Francisco CA Water New
Crystal
Springs
Bypass
Tunnel:
The
Hetch
Hetchy
Water
System
serves
2.4
million
customers
in
the
Bay
 








33,000,000
 115
San
Francisco CA Water Harding
Park:
The
San
Francisco
Public
U3li3es
Commission
(SFPUC)
Regional
Water
System
delivers
pris3ne
 








60,000,000
 379
San
Francisco CA Water Sharp
Park
Recycled
Water
:
The
San
Francisco
Public
U3li3es
Commission
(SFPUC)
Regional
Water
System
 










8,000,000
 379
San
Gabriel CA Streets/Roads Grade
Separa3on
for
railroad
crossings
in
San
Gabriel
CA 






160,000,000
 200
San
Jose CA Airport Airport
People
Mover 








50,000,000
 200
San
Jose CA CDBG Energy
Efficiency
and
Renewable
Energy
Projects
in
Low
Income
Communi3es 










2,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
San
Jose CA Energy Clean
tech
Energy
Efficient
Street
Lights 








20,000,000
 100
San
Jose CA Energy Fuel
Cell
Project 








12,000,000
 250
San
Jose CA Energy Energy
Efficiency
and
Renewable
Energy
Proejcts‐
P3s 








10,000,000
 500
San
Jose CA Energy Installa3on
of
Solar
Paneling
on
Consolidated
Rental
Car
Garage 








10,000,000
 500
San
Jose CA Streets/Roads Montague
Expressway
Improvements
in
North
San
Jose 








44,000,000
 250
San
Jose CA Streets/Roads Route
101/Capitol
Expressway/Yerba
Buena
Interchange
Project 








40,000,000
 250
San
Jose CA Streets/Roads Route
101/Trimble
Interchange
Upgrade










34,000,000
 250
San
Jose CA Streets/Roads Route
280/880
Stevens
Creek
Interchange
Updgrade 








50,000,000
 250
San
Jose CA Transit Downtown
BART
sta3on
portal
in
Historic
Bank
of
America
Building 








46,000,000
 500
San
Jose CA Transit San
Jose
Diridon
Transit
Sta3on
Expansion
for
BART
and
High
Speed
Rail 






100,000,000
 500
San
Jose CA Water Advanced
Recycled
Water
Treatment
Facility 








55,000,000
 500
San
Leandro CA CDBG Chabot
Park
improvements 










1,000,000
 20
San
Leandro CA CDBG Siempre
Verde
Park
Playground
equipment
construc3on 












750,000
 20
San
Leandro CA CDBG Muir
soccer
field
Synth3c
Turf
Construc3on 










1,700,000
 28
San
Leandro CA CDBG Citywide
ADA
Handicap
Ramp
Improvements 










1,000,000
 30
San
Leandro CA CDBG Marina
Park
renova3on 










1,000,000
 30
San
Leandro CA CDBG Steenzel
Park
Restroom
replacement 












500,000
 30
San
Leandro CA CDBG Washinton
Manor
Park
Renova3on 










1,400,000
 30
San
Leandro CA CDBG Toyn
Park
Improvements 










1,500,000
 35
San
Leandro CA CDBG San
Leandro
Senior
Center
construc3on 








10,000,000
 80
San
Leandro CA CDBG Washington
Manor
pool
construc3on 










4,500,000
 100
San
Leandro CA CDBG Mulford
Marina
Library
Construc3on 










6,300,000
 110
San
Leandro CA CDBG City
Center
500‐car
Garage
construc3on
 








14,000,000
 120
San
Leandro CA Energy WPCP
Cogenera3on
Plant
construc3on 










4,600,000
 32
San
Leandro CA Schools Joint
School/City
gymnasium 










3,000,000
 60
San
Leandro CA Streets/Roads Dolifle
dr
and
Hesperian
boulevard
Landscape
median
improvements 










1,000,000
 30
San
Leandro CA Streets/Roads FAU
streets
Reconstruc3on
Project 










2,500,000
 30
San
Leandro CA Streets/Roads Macarthur
blvd
streetscape
improvements 










2,000,000
 45
San
Leandro CA Streets/Roads San
Leandro
blvd
streetscapes
improvement 










3,000,000
 45
San
Leandro CA Streets/Roads Davis
street
Pedestrian
over‐crossing 










4,000,000
 80
San
Leandro CA Streets/Roads Eden
rd
(new)
street
construc3on 










6,000,000
 100
San
Leandro CA Streets/Roads Street
rehabilita3on
Projects 










9,000,000
 180
San
Leandro CA Water Sanitary
Sewer
Line
replacements 












952,000
 20
San
Leandro CA Water Inflow/Infiltra3on
Improvements
of
City's
collec3on
sewer
system 










2,800,000
 23
San
Marcos CA CDBG Replace
local
park
in
a
low‐income
neighborhood. 










1,400,000
 35
San
Marcos CA Energy Energy‐efficient
ligh3ng
update
in
Civic
Center
Parking
Structure.

Retrofiqng
exis3ng
HPS
lights
with
induc3on
 












500,000
 5
San
Marcos CA Energy Installa3on
of
new
chillers
at
Civic
Center
that
would
replace
inefficient
HVAC
system
and
reduce
energy
use. 












250,000
 5
San
Marcos CA Energy A
103‐unit
green,
affordable,
mixed
use
rental
development.
The
development
will
incorporate
numerous
 










1,000,000
 150
San
Marcos CA Streets/Roads Guard
rail
installa3on
on
Twin
Oaks
Valley
Road
and
on
San
Elijo
Road 












700,000
 20
San
Marcos CA Streets/Roads Twin
Oaks
Valley
Road
widening
and
improvements 












900,000
 25
San
Marcos CA Streets/Roads Drainage
improvements
along
Chinaberry
Road 












600,000
 30
San
Marcos CA Streets/Roads Fiberop3c
traffic
signal
synchroniza3on
throughout
the
City. 










1,400,000
 30
San
Marcos CA Streets/Roads Sprinter
(regional
transit)
mi3ga3on.

Re‐installing
a
park
near
Civic
Center
and
community
center. 










1,000,000
 45
San
Marcos CA Streets/Roads Barham
Drive
sidewalk
and
trail
improvements 










2,000,000
 50
San
Marcos CA Streets/Roads Street
rehabilita3on
projects
throughout
the
City. 










4,000,000
 50
San
Ramon CA Energy Valle
Vista
Affordable
Senior
Housing
Project
Solar
panel
system
and
energy
efficiency
construc3on 










3,000,000
 200
San
Ramon CA Streets/Roads Hooper
Drive
Widening
Project 












200,000
 10
San
Ramon CA Streets/Roads Alcosta
Boulevard
Pavement
Resurfacing 










1,500,000
 50
San
Ramon CA Streets/Roads San
Ramon
Valley
Boulevard
Pavement
Resurfacing
(Phase
II) 










2,389,000
 80
San
Ramon CA Streets/Roads San
Ramon
Valley
Boulevard
Pavement
Resurfacing
(Phase
I) 










2,911,000
 97
San
Ramon CA Streets/Roads Bollinger
Canyon
Road
Pedestrian
Overcrossing 








10,000,000
 300
San
Ramon CA Streets/Roads Crow
Canyon
Road
Pedestrian
Overcrossing 








10,000,000
 300
San
Ramon CA Streets/Roads Widen
Crow
Canyon
road
from
4
to
6
lanes
from
Alcosta
Blvd.
to
East
City
Limit
Line 










8,996,400
 300
San
Ramon CA Streets/Roads Widen
Bollinger
Canyon
Road
from
6
to
8
lanes
from
Alcosta
Blvd.
to
Interstate
680 








10,581,855
 353
Santa
Ana CA CDBG Segerstrom
Avenue
Rehabilita3on:
Raif
to
Fairview 












262,000
 10
Santa
Ana CA CDBG Civic
Center
Drive
Rehabilita3on:
French
to
San3ago 












730,000
 20
Santa
Ana CA CDBG Segerstrom
Avenue
Rehabilita3on:
Fairview
to
Harbor 












835,000
 20
Santa
Ana CA CDBG McFadden
Avenue
Rehabilita3on:
Bristol
to
Flower 












880,000
 25
Santa
Ana CA CDBG Segerstrom
Avenue
Rehabilita3on:
Bristol
to
Raif 










1,000,000
 25
Santa
Ana CA CDBG Residen3al
Street
Improvements:
French
Court 










1,000,000
 30
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Shadow
Run 










1,000,000
 30
Santa
Ana CA CDBG McFadden
Avenue
Rehabilita3on:
Standard
to
Maple 










1,400,000
 35
Santa
Ana CA CDBG Fibh
Street
Rehabilita3on:
Fairview
Street
to
Jackson
Street 










1,457,000
 40
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Casa
Bonita 










1,700,000
 40
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Saddleback
View 










1,500,000
 40
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Willard 










1,500,000
 40
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Wilshire
Square 










1,700,000
 40
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Edna
Park 










1,800,000
 50
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Fairhaven 










2,000,000
 50
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Lyon
Street 










2,000,000
 50
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Morrison‐Eldridge
Park 










2,300,000
 60
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Windsor
Village
North 










2,200,000
 60
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Heninger
Park












2,700,000
 70
City State Program Project
Descrip3on Funding
Required Jobs
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Bristol/Warner 










3,300,000
 80
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Sunwood
Central












3,200,000
 80
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Lacy 










3,400,000
 90
Santa
Ana CA CDBG Residen3al
Street
Improvements:
New
Horizons 










3,600,000
 90
Santa
Ana CA CDBG Centennial
Park:
Rehabilita3on
of
Loop
Road
and
Parking

Lots,
construc3on
of
2
synthe3c
soccer
fields
and

concrete
bleachers
in
complex
and
sports
ligh3ng
on
one
field 










6,400,000
 100
Santa
Ana CA CDBG Industrial
Streets
(Garnsey
Business
District) 










3,850,000
 100
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Bella
Vista 










4,000,000
 100
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Eastside 










3,900,000
 100
Santa
Ana CA CDBG Residen3al
Street
Improvements:
French
Park 










4,000,000
 100
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Windsor
Village 










4,300,000
 110
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Pico
Lowell 










4,700,000
 120
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Central
City 










5,000,000
 130
Santa
Ana CA CDBG Industrial
Streets
(area
south
of
Centennial
Park) 










5,500,000
 140
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Centennial
Park 










5,700,000
 140
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Valley
Adams 










5,500,000
 140
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Madison
Park 










7,600,000
 190
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Mid‐City 








10,000,000
 250
Santa
Ana CA CDBG Residen3al
Street
Improvements:
Bristol
Manor 








11,000,000
 280
Santa
Ana CA CDBG Bristol
Phase
I
(Pine
to
Mc
Fadden) 








13,700,000
 400
Santa
Ana CA CDBG First
Street
Bridge
Replacement
at
the
Santa
Ana
River 








20,000,000
 500
Santa
Ana CA Energy Solar
systems
for
two
City
buildings.

Installa3on
is
expected
to
begin
in
early
2009
and
will
be
completed
by
 










2,625,555
 66
Santa
Ana CA Energy Energy
efficiency
improvements
to
city
buildings,
including
ligh3ng,
HVAC,
and
system
controls.
The
scope
is
 










4,508,885
 113
Santa
Ana CA Public
Safety School
Resource
Officers
for
all
Junior
High
and
High
Schools 












500,000
 20
Santa
Ana CA Public
Safety Neighborhood
Police
Community
Oriented
Policing/Problem
Oriented
Teams 










1,300,000
 60
Santa
Ana CA Transit Regional
Transporta3on
Center
Improvements
(ADA
upgrades,
façade
improvements,
fire
protec3on,
alarms) 










4,600,000
 150
Santa
Ana CA Water Bristol
Phase
I‐
MWD
Water
Improvements












1,300,000
 30
Santa
Ana CA Water S‐1
Storm
Drain 








10,500,000
 300
Santa
Ana CA Water R‐1
Storm
Drain 








31,200,000
 870
Santa
Barbara CA Airport Airline
Terminal
Improvement
Project
‐
Construc3on
of
a
67,000
square
foot
two‐story
airline
terminal
facility,
 








45,000,000

Santa
Barbara CA Airport Airport
Sewer
System
‐
To
construct
a
perimeter
wastewater
collec3on
system
for
the
area
south
of
Hollister

Avenue.

Construct
a
lib
sta3on
and
force
main
from
new
lib
sta3on
to
Goleta
Sanitary
District
trunk
line
in

Fairview
Avenue
in
accordance
wit 










4,800,000

Santa
Barbara CA Airport Airport
Water
System
Improvement
Project
‐
To
construct
a
looped
network
system
to
supply
domes3c
and
fire
 










1,360,000

Santa
Barbara CA CDBG 
Marina
One
Replacement
Project
‐
Phase's
1,2,3
 










4,300,000

Santa
Barbara CA CDBG 
Mission
Creek
Steelhead
Passage
at
Oak
Park.

The
purpose
of
this
project
is
to
restore
Mission
Creek
in
Oak
 












800,000

Santa
Barbara CA CDBG Stearns
Wharf
&
City
Pier
Pile
Driving
Project
 












185,000

Santa
Barbara CA CDBG Alameda
Park
Gazebo
‐

A
historic
gazebo
in
one
of
Santa
Barbara's
oldest
parks,
the
project
includes
the
 












200,000

Santa
Barbara CA CDBG Cabrillo
Bathhouse
Restroom
Renova3on
‐

Located
within
the
City's
oldest
beach
front
facility,
the
project
 












100,000

Santa
Barbara CA CDBG Carrillo
Gym
Spalling
Repair
‐

A
"Structure
of
Merit"
the
project
includes
the
repair
of
the
concrete
gym
walls. 












500,000

Santa
Barbara CA CDBG Catch
Basin
Debris
Screens
‐
The
purpose
of
this
project
is
to
install
catch
basin
debris
screens
in
various
areas
 










1,100,000

Santa
Barbara CA CDBG Chase
Palm
Park
Renova3on
‐

The
project
includes
replacement
and
repair
of
park
ligh3ng,
walkways,
 












870,000

Santa
Barbara CA CDBG City
Infrastucture
Storm
Water
Quality
Improvement
Retrofit
Project
‐
The
purpose
of
the
project
is
to
 












800,000

Santa
Barbara CA CDBG Fire
Sta3on
Infrastructure
Upgrades
(retrofit
exisi3ng
ligh3ng
fixtures,
HVAC
systems
and
roofs
targe3ng
 














95,000

Santa
Barbara CA CDBG Franklin
Community
Center
Kitchen
Renova3on
&
Equipment 












150,000

Santa
Barbara CA CDBG Harbor
Breakwater
Cap
Repair
Project
 












800,000

Santa
Barbara CA CDBG Main
Library
Roof
Replacement
(with
cool
roof
system
targe3ng
energy
conserva3on) 












350,000

Santa
Barbara CA CDBG Oak
Park
Restroom
Renova3on
‐
The
renova3on
project
includes
new
fixtures,
par33ons,
flooring,
ligh3ng
and
 












250,000

Santa
Barbara CA CDBG Park
&
Recrea3on
Facility
Retrofits
&
Maintenance

(Inlcludes
public
facili3es
such
as
recrea3on,
senior,
arts
 












588,000

Santa
Barbara CA CDBG Playground
Replacement
for
Sunflower
Park
and
Eastside
Park
‐

Playgrounds
to
be
replaced
to
comply
with
 












295,000

Santa
Barbara CA CDBG Police
Department
Infrastructure
Upgrade
(Retrofit
exis3ng
fluorescent
fixtures,
HVAC
systems,
and
windows
 












153,000

Santa
Barbara CA CDBG Police
Department
Remodel
Polygraph
Room
(remove
asbestos,
paint
walls,
replace
ceiling,
carpet
and
 














25,000

Santa
Barbara CA CDBG Public
Works
Corporate
Yard
and
Administra3on
Offices
(Remove
asphalt,
repair
failed
basecourse,
modify
 












280,000

Santa
Barbara CA CDBG Rebuild
Municipal
Tennis
Stadium 










1,000,000

Santa
Barbara CA CDBG Replace
Library
Fire
and
Intrusion
Alarms
(two
libraries) 












420,000

Santa
Barbara CA CDBG Replace
windows
and
repair
damaged
wood
at
Las
Positas
Tennis
Facility 














80,000

Santa
Barbara CA CDBG Resurface
Parks
&
Recrea3on
Facili3es
parking
lots 












655,000

Santa
Barbara CA CDBG San
Pascual
Storm
Drain
Diversion
‐

The
purpose
of
the
project
is
to
improve
water
quality
within
Old
Mission
 












300,000

Santa
Barbara CA CDBG Security
Cameras
at
two
City
Parks 














60,000

Santa
Barbara CA CDBG Shoreline
Park
Renova3on
Project
‐

A
popular
community
bluff
top
parks,
the
project
includes
renova3on
of
 












500,000

Santa
Barbara CA CDBG Sidewalk,
curb
and
gufer
infill
projects
‐
various
loca3ons
throughout
the
City.
 










1,075,000

Santa
Barbara CA CDBG Sunflower
Park
Landscape
Renova3on 














21,000

Santa
Barbara CA CDBG Upgrades
and
repair
for
the
Ortega
Park
Restroom
 












325,000

Santa
Barbara CA CDBG Upper
Las
Positas
Creek
Restora3on
and
Storm
Water
Management
Project.

The
project
has
two
primary

objec3ves:
1)
to
construct
storm
water
deten3on
system
(bioswales
and
deten3on
ponds)
to
reduce
flood

flows
and
improve
water
quality
in
Las
Positas
Creek. 










1,200,000

Santa
Barbara CA Streets/Roads Access
Ramps 










1,000,000

Santa
Barbara CA Streets/Roads Bridges 










9,639,800

Santa
Barbara CA Streets/Roads Overlay
(Rubber
AC) 










5,000,000

Santa
Barbara CA Streets/Roads Overlays 










8,000,000

Santa
Barbara CA Streets/Roads Sidewalk
Infill 










1,500,000

Santa
Barbara CA Streets/Roads Sidewalk
Replacement 










1,300,000

City State Program Project
Descrip3on Funding
Required Jobs
Santa
Barbara CA Streets/Roads Storm
Drain 












700,000

Santa
Barbara CA Streets/Roads Streetlight
Improvements 










6,500,000

Santa
Barbara CA Water Aera3on
Basin
Diffusers 












200,000

Santa
Barbara CA Water Energency
Generators 












200,000

Santa
Barbara CA Water Equiliza3on
Basin 












250,000

Santa
Barbara CA Water Headworks
Screening 










4,500,000

Santa
Barbara CA Water Lib
sta3on
rehab 












180,936

Santa
Barbara CA Water Reservoir
Projects 












175,000

Santa
Barbara CA Water Sewer
Rehabilitaion 












500,000

Santa
Barbara CA Water Sewer
Replacement 












925,000

Santa
Barbara CA Water Water
Distribu3on
System 












195,000

Santa
Barbara CA Water Water
Mains 










4,587,500

Santa
Barbara CA Water Water
Treatment 














60,000

Santa
Cruz CA Housing Monterey
Bay
na3onal
Marine
Santuary
Visitor
Center 










9,600,000
 135
Santa
Cruz CA Housing Tannery
Arts
Center
Working
Studios 








10,000,000
 141
Santa
Cruz CA Streets/Roads Downtown
Streetlight
Replacement 












250,000
 4
Santa
Cruz CA Streets/Roads Soquel
Streetlight
Replacement 












500,000
 7
Santa
Cruz CA Streets/Roads San
Lorenzo
River
Trestle
Bridge
Connec3on 












700,000
 10
Santa
Cruz CA Streets/Roads Soquel
and
Pine
Storm
Drain
Water/Sewer 












750,000
 11
Santa
Cruz CA Streets/Roads San
Lorenzo
River
Mul3
Purpose
path
under
Highway
1 










1,000,000
 14
Santa
Cruz CA Streets/Roads Phase
1
street
pavement
Rehabilita3on 










2,000,000
 28
Santa
Cruz CA Streets/Roads Phase
2
street
pavement
rehabilita3on 










2,000,000
 28
Santa
Monica CA Streets/Roads Upgrade
stringers
and
deck
boards
on
the
Newcomb
Deck,
adjoining
the
Santa
Monica
Pier,
to
support
vehicles
 










6,875,000
 10
Santa
Monica CA Streets/Roads Replace
101
light
poles
and
16,000
b
of
LED
lights
on
the
Santa
Monica
Pier
to
provide
more
efficient
light
and

to
replace
fixtures
and
poles
damaged
by
the
marine
environment.
 










1,850,000
 12
Santa
Monica CA Streets/Roads U3li3es
on
the
Santa
Monica
Pier
need
to
be
upgraded
to
repair
fire
sprinklers
and
install
a
new
standpipe
for

fire
safety,
replace
frozen
water
valves,
and
replace
worn
u3li3es
line
hangars
and
water,
sewer
and
gas
pipes.
 












750,000
 12
Santa
Monica CA Streets/Roads Replace
78
wood
piles
in
the
water
suppor3ng
the
Santa
Monica
Pier
with
concrete,
cast‐in‐place
concrete

piles
and
caps.
 










5,000,000
 20
Santa
Rosa CA CDBG ADA
Compliance 










2,000,000
 15
Santa
Rosa CA Energy biomass
to
fuel
project 














75,000
 5
Santa
Rosa CA Energy solar
installa3on 










1,000,000
 10
Santa
Rosa CA Public
Safety school
resource
officers 












550,000
 5
Santa
Rosa CA Public
Safety interoperability
project 










1,000,000
 8
Santa
Rosa CA Streets/Roads 6th
St.
Undercrossing 










1,100,000
 10
Santa
Rosa CA Streets/Roads Bicentenni3al
Turn
Lanes 












750,000
 10
Santa
Rosa CA Streets/Roads Mendocino
Avenue
Adap3ve
Traffic
Control
Project 












750,000
 10
Santa
Rosa CA Streets/Roads Spring
Street
Sewer

&
Water
Improvements 










2,000,000
 15
Santa
Rosa CA Streets/Roads College
Avenue
widening
and
Class
2
Bike
Lanes 










1,100,000
 17
Santa
Rosa CA Streets/Roads Hearn
Avenue
Widening 










1,400,000
 25
Santa
Rosa CA Streets/Roads Stony
Point
Road
Widening
&
Reconstruc3on

Hwy
12
to
Sebastopol
Road 










3,000,000
 35
Santa
Rosa CA Streets/Roads Overlay
Project 










6,200,000
 41
Santa
Rosa CA Streets/Roads Bike
and
Ped
Path 










4,500,000
 45
Santa
Rosa CA Streets/Roads farmers
lane
extension 








40,000,000
 264
Santa
Rosa CA Transit Farebox
Modifica3ons 












800,000
 12
Santa
Rosa CA Transit Rapid
Bus
Corridor 












850,000
 12
Santa
Rosa CA Transit transit
mall
improvements 










1,000,000
 15
Santa
Rosa CA Transit Transit
Opera3ons
‐Restore
State
Funding
loss 










2,400,000
 16
Santa
Rosa CA Transit Transit
"Green"
Retrofit 










2,300,000
 18
Santa
Rosa CA Transit Technology
upgrade 










3,000,000
 23
Santa
Rosa CA Transit hybrid
bus
purchase‐‐13 










8,450,000
 38
Santa
Rosa CA Water reclaimed
water
pilot
program 










2,000,000
 13
Santa
Rosa CA Water seismic
upgrade
of
water
facili3es 










2,250,000
 15
Santa
Rosa CA Water sewer
and
water
replacement 










3,000,000
 20
Santa
Rosa CA Water discharge
compliance
project 










5,000,000
 33
Santa
Rosa CA Water geysers
pipeline
project 










5,000,000
 33
Santa
Rosa CA Water various
sewer/water
replacement 










8,500,000
 54
Simi
Valley CA CDBG Purchase
and
renova3on
or
construc3on
of
a
20,000
square
foot
mul3‐disciplinary
building
to
house
social
 








11,000,000
 50
Simi
Valley CA CDBG Expansion
of
City
Hall 








33,000,000
 175
Simi
Valley CA Energy Installa3on
of
energy
efficient
HVAC
systems,
indoor
lights,
and
outdoor
ligh3ng
at
City‐owned
public
buildings 












900,000
 10
Simi
Valley CA Energy U3lize
solar
power
to
offset
electricity
usage
at
the
City’s
sewage
treatment
plant
and
dewatering
wells 












150,000
 10
Simi
Valley CA Energy Retrofit
amber
light
traffic
signals
with
energy
efficient,
LED
lamps
(1,500
units) 












225,000
 20
Simi
Valley CA Energy Retrofit
street
name
signs
with
solar/LED
ligh3ng
(120
intersec3ons) 










2,400,000
 20
Simi
Valley CA Energy Development
of
facility
that
uses
digester
gas
generated
at
the
City’s
wastewater
treatment
plant
to
generate

electricity 










1,250,000
 30
Simi
Valley CA Energy Rebates
to
homeowners
of
buildings
constructed
prior
to
1975
to
par3ally
offset
the
cost
of
weather‐stripping,
 










2,000,000
 100
Simi
Valley CA Public
Safety Development
of
an
on‐line
system
for
the
submission
of
police
reports
by
the
public 












100,000
 1
Simi
Valley CA Public
Safety Upgrade
of
mobile
computer
units
in
Police
vehicles
to
include
improved
func3onality 












300,000
 3
Simi
Valley CA Public
Safety Offsite
backup
of
the
Police
Department’s
Integrated
Police
Systems
for
disaster
recovery
purposes 










1,200,000
 5
Simi
Valley CA Public
Safety Purchase
and
installa3on
of
a
Citywide
Reverse
911
system 










1,400,000
 5
Simi
Valley CA Public
Safety Replacement
of
the
City’s
outdated
telephone
system 










1,200,000
 5
Simi
Valley CA Streets/Roads Minor
Street
Rehabilita3on
‐
Two
ramps
at
the
intersec3on
of
Royal
Ave.
and
Acadia
St. 















6,800
 0.07
Simi
Valley CA Streets/Roads Minor
Street
Rehabilita3on
‐
Azure
Ct. 














25,000
 0.25
Simi
Valley CA Streets/Roads Minor
Street
Rehabilita3on
‐
Crack
filling
of
various
major
streets 














75,000
 0.75
Simi
Valley CA Streets/Roads Major
Street
Rehabilita3on
‐
Repair
of
pavement
ruqng
at
Sycamore
Dr.
and
Los
Angeles
Ave. 












150,000
 1.5
Simi
Valley CA Streets/Roads Minor
Street
Rehabilita3on
‐
Azure
Ct.
and
Azure
Hills
Dr.
area 












150,000
 1.5
Simi
Valley CA Streets/Roads Minor
Street
Rehabilita3on
‐
Stonebrook
St.,
west
of
Longbranch
Rd. 












150,000
 1.5
City State Program Project
Descrip3on Funding
Required Jobs
Simi
Valley CA Streets/Roads Minor
Street
Rehabilita3on
‐
West
Cochran
St.,
west
of
Park
Center
Dr. 












150,000
 1.5
Simi
Valley CA Streets/Roads Minor
Street
Rehabilita3on
‐
Sequoia
Ave.
(Presidio
Dr.)
north
of
Township
Ave. 












200,000
 2
Simi
Valley CA Streets/Roads Minor
Street
Rehabilita3on
‐
Stonebrook
St.
between
Sinaloa
Rd.
and
First
St. 












280,000
 2.8
Simi
Valley CA Streets/Roads Major
Street
Rehabilita3on
‐
Erringer
Rd.
(Fitzgerald
Rd.
to
south
end) 












600,000
 6
Simi
Valley CA Streets/Roads Major
Street
Rehabilita3on
‐
Fitzgerald
Rd.
(Sequoia
Ave.
to
Appleton
Rd.) 










1,000,000
 10
Simi
Valley CA Streets/Roads Replacement
of
deteriorated
curbs,
gufers,
and
sidewalks
in
older
areas
of
the
City 












300,000
 10
Simi
Valley CA Streets/Roads Major
Street
Rehabilita3on
‐
Madera
Rd.
(Streathearn
Pl.
to
200'
south
of
Royal
Ave.) 










1,400,000
 14
Simi
Valley CA Streets/Roads Enhanced
slopes
below
118
Freeway
overpasses
at
Madera
Rd.,
Erringer
Rd.,
Eycamore
Dr.,
Galena
Ave.,
 










2,000,000
 20
Simi
Valley CA Streets/Roads Major
Street
Rehabilita3on
‐
Cochran
St.
(Sycamore
Dr.
to
Erringer
Rd.) 










2,000,000
 20
Simi
Valley CA Streets/Roads Construc3on
of
undercrossings
where
arterial
streets
intersect
a
flood
control
channel
to
allow
for
pedestrian
 










3,200,000
 75
Simi
Valley CA Transit Bus
stop
enuncia3on
system
for
fixed
route
buses 














74,000
 10
Simi
Valley CA Transit Three
Dial‐A‐Ride/Paratransit
vans 












283,500
 20
Simi
Valley CA Transit Moderniza3on
of
transit
center
garage 












800,000
 30
Simi
Valley CA Transit Replace/upgrade
deteriorated
transit
shelters 












720,000
 40
Simi
Valley CA Transit Replacement
of
four
fixed‐route
CNG
buses 










1,672,000
 40
Simi
Valley CA Water Groundwater
basin
well
and
collector
line 










1,500,000
 10
Simi
Valley CA Water Water
main
replacements 










1,000,000
 20
Simi
Valley CA Water Recycled
water
projects 








15,000,000
 30
Simi
Valley CA Water Construc3on
of
bank
stabiliza3on
improvements
downstream
of
the
City’s
wastewater
treatment
plant. 








14,000,000
 50
Simi
Valley CA Water Replacement
of
corroded
trunk
sewer
lines
at
seven
loca3ons 










8,000,000
 70
Stockton CA Energy HVAC
replacement
program
‐
replacement
of
an3quated
HVAC
equipment
in
various
City
building
with
more
 










2,500,000
 95
Stockton CA Energy Roof
replacement/repair
of
city
buildings
‐
replacement
of
aged
roofs
of
city
buildings
to
preserve
building
 










3,000,000
 114
Stockton CA Energy 1mW
Solar
Photovoltaic
System
‐
Installa3on
of
1
megawaf
of
solar
photovoltaic
panels
at
City
owned
facili3es
 










8,500,000
 324
Stockton CA Streets/Roads California
Street
Improvements
(120
days) 












500,000
 100
Stockton CA Streets/Roads Curb,
gufer,
sidewalk
and
wheelchair
ramp
program
(120
days) 










1,500,000
 100
Stockton CA Streets/Roads Duck
Creek
Bicycle
Path
Gap
Closure
(120
days) 












150,000
 100
Stockton CA Streets/Roads Neighborhood
traffic
calming
program
(120
days) 










1,000,000
 100
Stockton CA Streets/Roads Sufer
Street

Pedestrian
&
Bicycle
Bridge
Project
(180
days) 










1,400,000
 100
Stockton CA Streets/Roads Traffic
Signal
Installa3ons
‐
5
loca3ons
(120
days)
 










2,500,000
 100
Stockton CA Streets/Roads Trinity
Bridge
Extension
(180
days) 












300,000
 100
Stockton CA Streets/Roads Weston
Ranch
Fiber
Op3c
Network‐
(traffic
signal
control
system)
(120
days) 










1,200,000
 100
Stockton CA Streets/Roads Wilson
Way
Corridor
Adap3ve
Traffic
Control
System
(120
days) 










1,800,000
 100
Stockton CA Streets/Roads ADA
Pedestrian
Crossing
Enhancements
(120
days) 










4,000,000
 200
Stockton CA Streets/Roads El
Dorado
Street
&
Center
Overpasses
Rehabilita3on
(120
days) 










3,000,000
 200
Stockton CA Streets/Roads Traffic
Signal
Controller
Upgrades
‐
Citywide
(120
days) 










3,000,000
 200
Stockton CA Streets/Roads Weber
Avenue
Streetscape
Beau3fica3on
Project
‐
Phase
2
(180
days) 










2,800,000
 200
Stockton CA Streets/Roads Airport
Way
Streetscape
Beau3fica3on
‐
Phase
2
(tenth
street
to
carpenter
‐
180
days) 










4,600,000
 300
Stockton CA Streets/Roads Bridge
Preventa3ve
Maintenance
(citywide
365
days) 










6,200,000
 300
Stockton CA Streets/Roads El
Dorado
Street
Widening
(365) 










3,600,000
 400
Stockton CA Streets/Roads Hammer
Lane
Phase
IIIB
(120
Days) 










5,000,000
 400
Stockton CA Streets/Roads Street
Repair
Maintenance
Program
‐
Citywide
(120
days) 










8,800,000
 500
Stockton CA Streets/Roads Thornton
Road
Widening
(120
Days) 










8,500,000
 600
Stockton CA Streets/Roads Arch
Sperry
Road
Extension
(365
days) 








20,000,000
 2300
Stockton CA Streets/Roads French
Camp
Rd/I‐5
Interchange
(365
days) 








24,405,000
 2300
Stockton CA Streets/Roads North
Stockton
1‐5
Auxillary
Lanes
(
365
days) 








78,000,000
 3000
Stockton CA Streets/Roads North
Stockton
Railroad

Grade
Separa3ons
&
Bridge
Replacements
(365
days) 








73,000,000
 3900
Stockton CA Streets/Roads North
Stockton
1‐5
Mainline
Widening
(365
days) 






134,000,000
 5200
Stockton CA Water Delta
Water
Supply
Project
will
include
the
construc3on
of
an
intake
facility
and
pump
sta3on,
11
miles
of
new

pipeline
to
convey
the
delta
water
to
a
new
water
treatment
plan. 






200,000,000
 170
Sunnyvale CA CDBG Columbia
Neighborhood
Center
‐
3500
square
foot
expansion
of
exis3ng
neighborhood
services
center
that
 










1,000,000
 10
Sunnyvale CA Energy Building
Op3miza3on 














81,000
 1
Sunnyvale CA Energy Install
Photovotaic
Systems
at
City
Facili3es 










3,094,000
 1
Sunnyvale CA Energy Replace
4
exis3ng
sedans
with
Hybrids 














39,600
 1
Sunnyvale CA Energy Replace
High
Pressure
Sodium
street
lights
with
LED's 










8,378,750
 1
Sunnyvale CA Public
Safety BYRNE‐
Provide
TASER,
Less
Than
Lethal
Force,
Technology
to
all
patrol
officers 












200,000
 0
Sunnyvale CA Public
Safety BYRNE‐Computer
aided
dispatch
(CAD)
technology
for
Public
Safety
Fire
Apparatus.
Mobile
computer
terminals

hardware
and
sobware
to
facilitate
communica3ons
interoperability
for
Public
Safety
first
responders.













400,000
 0
Sunnyvale CA Public
Safety BYRNE‐License
Plate
Reader
(LPR)Technology,
purchase
and
installa3on
of
LPR
scanners
for
vehicle
and
 












108,000
 0
Sunnyvale CA Streets/Roads Caribbean
Drive
Bridge
‐
Rehabilitate
bridge,
replace
damaged
guard‐rails,
and
repair
bridge
deck. 










1,000,000
 1
Sunnyvale CA Streets/Roads Wolfe
Road
Bridge
‐
Rehabilitate
bridge
with
failed
bearing
pads.

Replace
bearing
pads,
patch,
and
correct

deficiencies 










3,000,000
 3
Sunnyvale CA Streets/Roads Mathilda
Overhead
Bridge
‐
Rehabilitate
a
bridge
rated
"func3onally
obsolete"
to
rebuild
off‐ramp,
correct
on‐
ramp,
pedestrian
access,
and
correct
other
deficiencies. 








35,000,000
 10
Sunnyvale CA Transit Expand
parking
for
train
users.

Creates
addi3onal
parking
near
the
Downtown
Sunnyvale
CalTrain
sta3on,
to

alleviate
parking
shortage. 












400,000
 1
Sunnyvale CA Transit Murphy
Ave.
Streetscape
‐
Provide
befer
pedestrian
access
and
ameni3es
connec3ng
business
district
with

mul3‐modal
transit
hub. 










5,400,000
 3
Sunnyvale CA Water Sanitary
Sewer
Replacement
‐
Replace
approx.
13,000
feet
of
sewer
pipe
in
poor
condi3on. 










3,400,000
 1
Sunnyvale CA Water Water
Main
Replacement
‐
Replace
cast
iron
water
mains
at
the
end
of
their
service
life
with
C900
Class
200
 










3,000,000
 1
Sufer
Creek CA CDBG Sufer
Creek
Infrastructure
West
Ridge
Extension
Project 










5,000,000
 40
Sufer
Creek CA Energy Sufer
Creek
Municipal
Facility
Solar
Project 












500,000
 2
Sufer
Creek CA Energy Sufer
Creek
Swimming
Pool
Solar
Project 












500,000
 2
Sufer
Creek CA Energy Sufer
Creek
Sewer
Plant
Solar
Project 










1,300,000
 5
Sufer
Creek CA Public
Safety COPS
hiring 












100,000
 1
City State Program Project
Descrip3on Funding
Required Jobs
Sufer
Creek CA Streets/Roads Gopher
Flat
Road
Reconstruc3on 










2,150,000
 20
Sufer
Creek CA Streets/Roads Citywide
Street
Reconstruc3on 










2,100,000
 24
Sufer
Creek CA Water Sufer
Creek/Amador
Regional
Sanita3on
Authority
Poplar
Planta3on
Spray
Irriga3on
Project 










1,200,000
 2
Sufer
Creek CA Water Sufer
Creek
Recycle
Water
Storage
Project 










4,000,000
 4
Sufer
Creek CA Water Sufer
Creek/Amador
Regional
Sanita3on
Authority
Goffinefe
Reservoir
Acquisi3on
and
Conversion
to
 










4,500,000
 4
Sufer
Creek CA Water Sufer
Creek/Amador
Regional
Sanita3on
Authority
Henderson
Reservoir
Rehabilita3on 










5,000,000
 4
Sufer
Creek CA Water Sufer
Creek/Amador
Regional
Sanita3on
Authority
pipeline
project 










5,000,000
 4
Sufer
Creek CA Water Sufer
Creek/Amador
Regional
Wastewater
Plant 








17,000,000
 10
Sufer
Creek CA Water Sufer
Hill
East
Sewer
and
Storm
Drain
Improvements 












600,000
 10
Temecula CA CDBG Neighborhood
Gym 










1,400,000
 40
Temecula CA Streets/Roads Storm
Drain
Culvert
repair.
Two
loca3ons,
Rancho
California
Road
and
Old
Town
Front
Street.
Total
cost

$920,000.

Both
projects
are
replacing
aging
storm
drain
systems
that
are
beginning
to
create
safety
concerns. 












866,000
 10
Temecula CA Streets/Roads Street
Reconstruc3on,
Jehediah
Smith,
Complete
rebuild 












300,000
 10
Temecula CA Streets/Roads Pavement
Maintenance
/
Slurry
Seal
City
Streets
in
need
of
maintenance.
Total
cost
$1,200,000. 










1,200,000
 15
Temecula CA Streets/Roads Rancho
California
Road
Storm
Drain
Repair 












350,000
 15
Temecula CA Streets/Roads Winchester
Road
(SR
79N)
median
improvements,
irriga3on,
and
landscape
Project.

Total
Project
cost
$3.4
 










2,275,000
 40
Temecula CA Streets/Roads Main
Street
Bridge
Replacement.
This
project
will
replace
a
damaged
wood
and
concrete
bridge
over
Murrieta
 










7,000,000
 75
Temecula CA Streets/Roads Murrieta
Creek
Bridge
and
Western
by‐pass
extension.
This
project
will
construct
a
new
four
lane
bridge
 










7,300,000
 80
Temecula CA Streets/Roads Murrieta
Creek
Bridge
and
Overland
Drive
Bridge.
This
project
will
construct
a
new
four
lane
bridge
serving
the
 








10,400,000
 130
Temecula CA Streets/Roads Buferfield
Stage
Road
Gap
Closure
Project. 








27,000,000
 250
Temecula CA Transit Highway
79S
Park
&
Ride 










1,300,000
 50
Temecula CA Water San3ago
Deten3on
Basin.This
is
a
flood
control
project
that
also
stabilizes
a
highly
erosive
creek
bed.
Total
cost
 












845,000
 10
Temecula CA Water Murrieta
Creek
Flood
Control,
Environmental
Restora3on,
Recrea3on
Project 










7,500,000
 150
Torrance CA Water City
Yard
Water
Quality
Improvement
Project 












350,000
 10
Torrance CA Water T‐1
Vault
Upgrades 












400,000
 10
Tracy CA Public
Safety Playground
Renova3on
Project,
CIPs
7891
&
7897 










2,000,000
 30
Tracy CA Public
Safety Clean
up
of
the
Downtown
Bow3e
Area 










8,000,000
 40
Tracy CA Public
Safety Fire
Sta3on
97 










7,200,000
 85
Tracy CA Schools Chrisman
Road
property
wastewater
line
extension
CIP
7469 










2,000,000
 30
Tracy CA Streets/Roads Old
Schulte
Rod
‐
Corral
Hollow
Rd.
to
city
limits,
CIP
73B6 










1,000,000
 10
Tracy CA Streets/Roads Corral
Hollow
Rd.
widening
between
Grant
Line
Rd.
and
West
Valley
Mall
Entry,
CIP
7314 










3,600,000
 25
Tracy CA Streets/Roads Bessie
Ave.
reconstruc3on,
CIP
73A1 










4,800,000
 30
Tracy CA Streets/Roads Corral
Hollow
Rd.
widening
between
Old
Schulte
Rd.
and
Grant
Line
Rd.,
CIPs
7382
&
7383 










7,500,000
 45
Tracy CA Streets/Roads Widening
of
Eleventh
St.
between
Lammers
Rd.
and
Highway
I‐205 








11,000,000
 55
Tracy CA Streets/Roads Widening
of
Lammers
Rd.
south
of
Eleventh
St.,
CIP
7393 








12,000,000
 60
Tracy CA Streets/Roads Grant
Line
Road
Reconstruc3on
between
Parker
Ave.,
to
MacArthur
Dr.,
CIP
7352 














11,000
 70
Tracy CA Streets/Roads Overlay
and
reconstruc3on
of
sidewalk
on
various
city
streets,
CIP
73B1 










7,300,000
 70
Tracy CA Water Paferson
Pass
Water
Booster
Pump
Sta3on
replacement,
CIP
7597 










1,000,000
 15
Tracy CA Water Wastewater
Effluent
Cooling
and
Habitat
Enhancement
Project 








14,500,000
 75
Turlock CA Streets/Roads Sidewalk
Hawkeye
Ave.
Geer
Rd
to
Donnelly
Park
Dr 














75,000
 5
Turlock CA Streets/Roads Project:
High
Street
Roadway
Improvements
from
Lander
Avenue
to
West
Avenue
South
Project
Descrip3on:
The
project
would
provide
a
2”
asphalt
overly
to
High
Street.
In
addi3on,
all
exis3ng

pedestrian
routes
will
be
improved
to
meet
ADA
standards. 












500,000
 26
Turlock CA Streets/Roads Pedras
Rd.
Pavement
Overlay/Resurface:
Geer
Rd.
to
Del's
Ln.
Rehabilita3on 












573,000
 31
Turlock CA Streets/Roads Golden
State
Blvd
and
"F"
St.
Intersec3on
Improvement:
Install
traffic
signal
Intelligent
Transporta3on
System 












650,000
 34
Turlock CA Streets/Roads E.
Hawleye
Ave.Pavement
Overlay/Resurface:
Quincy
Rd.
to
Palmer
Dr.
Rehabilita3on 












671,000
 36
Turlock CA Streets/Roads N.
Olive
Ave.
Pavement
Overlay/Resurface:
Monte
Vista
Ave.
to
Fullerton
Rehabilita3on 












696,000
 36
Turlock CA Streets/Roads Cristoffersen
Parkway
and
Fosburg
Rd.
Intersec3on
Improvements:
install
traffic
signal
Intelligent
Transporta3on
System
 












750,000
 39
Turlock CA Streets/Roads Golden
State
Blvd.
and
Pedras
Rd.
Intersec3on
Improvements:
install
traffic
signal
Intelligent
Transporta3on
System
 












750,000
 39
Turlock CA Streets/Roads Hawkeye
Ave.
and
Denair
St.
Intersec3on
Improvements:
install
traffic
signal
Intelligent
Transporta3on
System
 












750,000
 39
Turlock CA Streets/Roads W.
Main
St.
and
Tegner
Rd.
Intersec3on
Improvements:
install
traffic
signal
Intelligent
Transporta3on
System
 












750,000
 39
Turlock CA Streets/Roads W.
Main
St.
Pavement
Overlay/Resurface:
Lander
Ave.
to
West
Ave.
South
Rehabilita3on 












725,000
 39
Turlock CA Streets/Roads Handicapped
Wheelchair
Ramps
250
Loca3ons 












950,000
 49
Turlock CA Streets/Roads Golden
State
Blvd.
Pavement
Overlay/Resurface:
Fulkerth
Rd.
to
Tuolumne
Rd.
Rehabilita3on 










1,057,000
 55
Turlock CA Streets/Roads Geer
Rd.
Pavement
Overlay/Resurface:
Monte
Vista
Ave.
to
Taylor
Rd.
Rehabilita3on 










1,094,000
 57
Turlock CA Streets/Roads Fulkerth
Rd.
Pavement
Overlay/Resurface:
Tully
Rd.
to
N.
Golden
State
Blvd.
Rehabilita3on
 










1,126,000
 60
Turlock CA Streets/Roads Golden
State
Blvd
Pavement
Overlay/Resurface:
Crane
St.
to
South
city
limits
Rehabilita3on 










1,307,000
 68
Turlock CA Streets/Roads W.
Monte
Vista
Ave.Pavement
Overlay/Resurface:
Crowell
Rd.
to
Geer
Rd.
Rehabilita3on
 










1,523,000
 81
Turlock CA Streets/Roads Project:
Construc3on
of
off‐site
improvements
for
Public
Safety
Center
in
the
downtown.

Project
Descrip3on:
The
off‐site
improvements
are
necessary
to
serve
the
new
58,000
square
foot
public
safety

building
in
downtown
Turlock. 










1,800,000
 94
Turlock CA Streets/Roads PSR\PSE
and
Construc3on,
Fulkerth
Rd.
and
99
Freeway
Interchange
Upgrade.
Modifica3on
of
the
exis3ng

interchange
to
meet
traffic
demands 










6,000,000
 315
City State Program Project
Descrip3on Funding
Required Jobs
Turlock CA Transit Land
acquisi3on
for
transit
hub.
The
City
of
Turlock
currently
provides
a
fixed
route
transit
system
to
its
ci3zens.
In
addi3on,
Turlock
is
served
by

Stanislaus
and
Merced
County
Transit
Systems.
Currently,
these
three
transit
system
have
no
single
lo 










1,500,000
 22
Turlock CA Water Project:
Wastewater
Ouzall
Line
(Harding
Drain
Bypass)
Project
Descrip3on:
This
project
will
install
approximately
6
miles
of
pipeline
from
the
current
point
of

discharge
into
the
Harding
Drain
to
the
San
Joaquin
River.
This
pipeline
serves
the
en3re
 








25,000,000
 15
Turlock CA Water Project:
Turlock
Regional
Water
Quality
Control
Facility
Expansion
Project
Descrip3on:

The
project
will
make
improvements
to
the
RWQCF
to
expand
treatment
capacity
and

enhance
water
quality
(nitrates),
solids
handling,
and
the
removal
of
organics. 








30,000,000
 35
Ventura CA Energy Energy
Efficiency
and
Photovoltaic
Systems
‐Install
photovoltaic
panels
at
City
Hall
and/or
San
Jon
Yard
that
will

provide
up
to
100%
of
electricity
needs.

Solar
photovoltaic
panels
at
City
Hall
would
range
between
a
500
KW

and
600
KW
system.

 










5,500,000
 165
Ventura CA Streets/Roads Street
Resurfacing
‐
Sperry
Avenue
‐
includes
resurfacing
Sperry
Ave
from
Valen3ne
Rd
to
Colt
Street,
cold

milling,
pavement
repairs,
manhole
and
valve
adjustments
to
grade,
street
name
signs,
striping,
replacement

of
traffic
induc3ve
loops,
and
130,200 












450,000
 14
Ventura CA Streets/Roads Foothill/Kimball
Road
Traffic
Signal
‐
Construc3on
includes
a
new
traffic
signal
for
intersec3on
of
Foothill
Road

and
Kimball.
This
project
will
include
the
installa3n
of
sidewalk,
curb
ramps,
and
minor
drainage
improvements

at
the
intersec3on. 












500,000
 15
Ventura CA Streets/Roads Street
Resurfacing
‐
Poli
and
Foothill
from
Seaward
to
Hospital.

The
project
consists
of
overlaying
approx.

150,000
sq.
feet
of
deteriorated
roadway
with
new
asphalt.
The
project
includes
cold
milling,
pavement

repairs,
manhole,
and
valve
adjustments
 










1,000,000
 30
Ventura CA Streets/Roads Street
Resurfacing
‐
Olive
Street
project
includes
resurfacing
Olive
Street,
cold
milling,
pavement
repairs,

manhole
and
valve
adjustments
to
grade,
street
name
signs,
striping,
replacement
of
traffic
induc3ve
loops,

and
277,000
square
feet
of
asphalt. 










1,200,000
 32
Ventura CA Streets/Roads Street
Slurry
Seals
‐
The
project
provides
proac3ve
maintenance
by
slurry
sealing
city
streets
to
prolong
the
life

of
asphalt
streets.
The
project
includes
crack
sealing
and
restriping
the
pavement.
 










1,300,000
 33
Ventura CA Streets/Roads Street
Resurfacing
‐
Telegraph
Road
‐
The
project
includes
cold
milling,
pavement
repairs,
manhole
and
valve

adjustments
to
grade,
street
name
signs,
striping,
replacement
of
traffic
induc3ve
loops
&
498,000
sq.
b
of

asphalt
overlay. 










1,700,000
 37
Ventura CA Streets/Roads Street
Resurfacing
‐
Telephone
Road
From
Wells
to
Kimball
Overlaying
approx.
932,000
square
feet
of
asphalt.


The
project
includes
cold
milling
pavement
repairs,
street
name
signs,
striping,
replacement
of
traffic
induc3ve

loops.
 










3,500,000
 105
Ventura CA Streets/Roads Street
Resurfacing
from
Seaward
to
Mills
‐
Overlaying
approx.
714,000
square
feet
of
deteriorated
roadway

with
new
asphalt.

The
project
includes
cold
milling
pavement
repairs,
street
name
signs,
striping,
replacement

of
traffic
induc3ve
loops. 










3,500,000
 105
Ventura CA Streets/Roads Street
Resurfacing
‐
Montalvo
Neighborhood
West
‐
Resurfacing
approximately
36
lane
miles
of
residen3al

streets
and
includes
pavement
repair,
surface
prepara3on,
crack
sealing,
and
slurry
seal
applica3ons.
 










5,000,000
 150
Ventura CA Streets/Roads Victoria
Avenue/US‐101
Interchange
Phase
2
‐
This
project
consists
of
widening
and
realigning
the
northbound

onramp
and
offramp
in
order
to
improve
the
safety
of
motorists
entering
and
exi3ng
the
freeway.

Design,

permits
&
environmental
are
done.
 








10,000,000
 300
Ventura CA Water Harmon
Barranca
Stormdrain
Repairs
at
Major
Roadways
‐
will
replace
'80
and
50'
deteriorated
strom
drain

pipes
under
Telephone
and
Telegraph
Roads
respec3vely,
Repairs
are
necessary
by
late
2009
to
prevent
costly

roadway
collapses
and
sinkholes. 














60,000
 2
Ventura CA Water Day
Road
Booster
Pump
Sta3on
Electrical
Upgrade
‐
replace,
upgrade,
and
relocate
a
failing
electrical
panel
at

the
Day
Road
booster
pump
sta3on
for
the
Water
Distribu3on
System.
The
electrical
system
has
reached
the

useful
end
of
its
life
cycle.
 












150,000
 4
Ventura CA Water Harbor
Blvd/Olivas
Park
Dr.
Drainage
Project
‐
Consists
of
replacing
354
linear
feet
of
exis3ng
deteriorated

storm
drain
pipe
underneath
and
adjacent
to
Harbor
Blvd.
at
Olivas
Park
Dr.

with
a
48
diameter
HDPE
pipe.


The
pipe
replacement
is
necessary. 












400,000
 14
Ventura CA Water Booster
Pump
Sta3on
Fixed
Emergency
Power
‐
Installa3on
of
two
permanent
emergency/backup
generators

to
provide
the
ability
to
automa3cally
run
water
distribu3on
system
pump
sta3ons
during
extended
power

outages
at
strategic
loca3ons.
 












500,000
 15
Ventura CA Water Wastewater
Treatment
Plant
Aera3on
Blowers
‐
The
project
consists
of
replacing
exis3ng
deteriorated
blowers

and
a
building
enclosure
with
more
energy
efficient
blowers.
The
design,
permiqng
and
environmental

clearance
is
completed. 










5,000,000
 150
Ventura CA Water Surfers
Point
Improvements
‐
This
project
is
to
protect
the
beach
with
natural
buried
cobble
stone,
create
sand

dunes
over
the
buried
cobble,
relocate,
and
rebuild
the
State
Owned
Omer
Rains
beach
front
bike
path,
and

construct
parking
lot
and
drainage. 










6,000,000
 180
Visalia CA Airport Bank
of
chargers
for
airport
radios 















1,000
 0
Visalia CA Airport Facemasks
for
SCBA
dedicated
to
the
ARFF
(5) 















3,500
 0
Visalia CA Airport Thermal
Imaging
cameras
(2) 














30,000
 0
Visalia CA Airport AFFF
(foam
for
aircrab
firefigh3ng)
‐
200
gal. 















6,000
 1
Visalia CA Airport Personnel
Protec3ve
Equipment
(turn‐outs
firefighter
clothing
‐
18
sets) 














36,000
 1
Visalia CA Airport Type
III
Wildland
Fire
Engine
(for
ability
to
mi3gate
open
area
wildland
fires.

Currently,
we
do
not
have
an
off‐
road
fire
engine
for
wildland
fires.

The
airport
is
surrounded
by
acres
of
open
areas). 












305,000
 3
Visalia CA Airport Construct
10‐unit
Nested
Tee
Hangar
‐
East
side 












810,000
 18
Visalia CA Airport Access
Road
North
of
Runway 










1,500,000
 33
Visalia CA Airport Westside
Hangar
Development
&
Infrastructure 










5,000,000
 111
Visalia CA Amtrak Mul3‐modal
transit
center
expansion 










3,000,000
 60
Visalia CA CDBG Oval
Park
Renova3on 














90,000
 2
Visalia CA CDBG Job
Incubator
Facility
Remodal 












100,000
 11
Visalia CA CDBG Recrea3on
Park
Renova3on 












500,000
 11
Visalia CA CDBG Conven3on
Center
Remodal 










2,000,000
 44
Visalia CA CDBG Municipal
Animal
Control
Facility 










6,000,000
 133
Visalia CA Energy Water
controllers
in
parks 












200,000
 5
Visalia CA Energy Replacement
of
incandescent
traffic
signals
with
energy
efficient
LED
lights 












300,000
 7
Visalia CA Energy Water
controllers
in
L&L
districts 












400,000
 9
Visalia CA Energy CNG
Slow
Fill
Sta3on
at
Corpora3on
Yard
‐
Solid
Waste
Trucks 












450,000
 10
Visalia CA Energy Municipal
energy
retrofits 










2,000,000
 44
Visalia CA Energy Solar
on
city
facili3es 








20,000,000
 44
City State Program Project
Descrip3on Funding
Required Jobs
Visalia CA Energy Low
income
housing
energy
retrofits 










5,000,000
 111
Visalia CA Energy Water
efficiency
measures 










5,000,000
 111
Visalia CA Housing Housing
Unit
Project
#30‐19 












139,775
 15
Visalia CA Housing Housing
Unit
Project
#30‐16 












264,030
 35
Visalia CA Public
Safety Crime
View
‐
advance
mapping
interface
to
exis3ng
CAD
and
RHS 














23,000
 0
Visalia CA Public
Safety iBridge
sobware
‐
uncover
connec3ons,
paferns
and
rela3onships
hidden
in
data 















9,000
 0
Visalia CA Public
Safety Sobware
by
'Systeen'
to
conduct
a
forensic
analysis
on
a
cell
phone 















2,000
 0
Visalia CA Public
Safety Arson
Inves3gators 












250,000
 2
Visalia CA Public
Safety Financial
crimes
detec3ves
to
address
growing
problem
of
iden3ty
theb 












398,679
 3
Visalia CA Public
Safety Dispatchers
‐
for
fire
calls 












400,000
 4
Visalia CA Public
Safety 1
sergeant
and
4
officers
for
Street
Crime
Unit
‐
focus
on
violent
offenders 












812,270
 5
Visalia CA Public
Safety Install
Emergency
Vehicle
Detectors
at
50
signalized
intersec3ons 












360,000
 8
Visalia CA Schools Large
Knox
Box
for
40
school
sites
at
$500
each
(secure
steel
boxes
are
designed
to
hold
keys
for
building

access
as
well
as
emergency
site
documents;
these
are
used
by
fire
and
police
personnel
during
emergency

incidents) 














20,000
 1
Visalia CA Schools Mineral
King
Bowl
ligh3ng
systems 












500,000
 10
Visalia CA Schools Mul3ple
school
site
irriga3on
system
moderniza3on 












550,000
 12
Visalia CA Schools Golden
West
HS
electrical
infrastructure 












500,000
 15
Visalia CA Schools Mt.
Whitney
HS
electrical
infrastructure 












500,000
 15
Visalia CA Schools Mt.
Whitney
HS
alarms/telephones/network 










1,000,000
 20
Visalia CA Schools Mt.
Whitney
HS
school
library 












250,000
 25
Visalia CA Schools Quick
connec3on
outlets
for
emergency
power
(portable
generators)
for
school
gyms/mulitpurpose
rooms.

These
sites
would
be
used
for
shelters
during
disasters/emergencies.
40
sites
x
$50,000 










2,000,000
 30
Visalia CA Schools Redwood
HS
school/community
pool 












650,000
 30
Visalia CA Streets/Roads Traffic
Signal
at
Court
and
Whitendale 












200,000
 5
Visalia CA Streets/Roads Traffic
Signal
at
Demaree
and
Mill
Creek 












200,000
 5
Visalia CA Streets/Roads Burke
Street
from
Houston
to
Roosevelt 












500,000
 11
Visalia CA Streets/Roads Street
Rehabilita3on
‐
Minor
Overlays 










1,000,000
 22
Visalia CA Streets/Roads Street
Rehabilita3on
‐
Dig
Outs 










1,500,000
 33
Visalia CA Streets/Roads Civic
Center
Block
Infrastructure
‐
Oak
and
School
extensions
and
Burke
Street
widening 










2,000,000
 43
Visalia CA Streets/Roads Tulare
Avenue
Extension
from
Lovers
Lane
to
McAuliff
Street 










2,000,000
 43
Visalia CA Streets/Roads Street
Rehabilita3on

‐
Cape
Seals 










2,000,000
 44
Visalia CA Streets/Roads Street
Rehabilita3on
‐
Major
Overlays 










2,500,000
 55
Visalia CA Streets/Roads Ben
Maddox
overcrossing
of
State
Route
198 










8,500,000
 184
Visalia CA Transit E‐85
Fueling
Sta3on 












200,000
 4
Visalia CA Transit Transit
Buses
for
shufle
service 










2,750,000
 57
Visalia CA Transit Transit
Center
Expansion 










3,000,000
 66
Visalia CA Transit Transit
Shufle
Center
Construc3on 










3,000,000
 66
Visalia CA Transit Transit
Maintenance
Facility
Expansion 










4,000,000
 88
Visalia CA Water Computer
Control
System
at
each
libsta3on
that
provides
opera3ng
informa3on
to
Treatment
Plant 










1,000,000
 20
Visalia CA Water Mineral
King
Avenue
Sewer 










1,500,000
 33
Visalia CA Water Sewer
Installa3on
in
Annexed
Areas 










3,000,000
 65
Vista CA CDBG Creek
Walk 












700,000
 21
Vista CA CDBG Park
Maintenance
Facility
‐
Phase
1 










1,200,000
 36
Vista CA Streets/Roads Thibodo
Road
Improvements 












500,000
 8
Vista CA Streets/Roads East
Vista
Way
Resurfacing
&
Traffic
Signals 












850,000
 25
Vista CA Streets/Roads Melrose
Drive,
Bobier
Drive,
N.
Santa
Fe
Avenue,
&
North
Drive
Resurfacing
 








10,000,000
 300
Vista CA Water Buena
Ouzall
Manhole
Rehabili3on


 












918,900
 30
West
Sacramento CA Energy Port
of
Sacramento
Power
Plant
–
Private
Public
Partnership:
Enligna
US
Inc.
is
construc3ng
a
wood
pellet
manufacturing
and
export
terminal
at
the
Port
of
Sacramento.


Enligna
will
be
impor3ng
wood
waste
that
is
currently
burned
in
orchards 








11,000,000
 220
West
Sacramento CA Streets/Roads Port
of
Sacramento
Entrance
and
Intersec3on:

This
project
will
facilitate
the
construc3on
of
a
new
fully

signalized
intersec3on,
with
rail
protec3on,
at
Harbor
and
Beacon
Boulevards.

 












850,000
 17
West
Sacramento CA Streets/Roads I
Street
Bridge
Rail
Replacement
Project:
Several
areas
on
the
I
Street
Bridge
to
be
repaired
or
maintained
for

safety
purposes.

The
I
Street
Bridge
has
been
iden3fied
as
being
on
the
Na3onal
Register
of
Historic
Places. 










1,200,000
 24
West
Sacramento CA Streets/Roads Cemex
Rail
Access
Project:

This
project
is
planned
and
designed
to
construct
a
rail
line
from
the
Port
of

Sacramento
to
a
regional
concrete
import
facility.

The
City’s
is
partnering
with
private
industry
and
public

contribu3ons
to
the
project 










1,400,000
 28
West
Sacramento CA Streets/Roads West
Sacramento
Community
Center:

The
new
West
Sacramento
Community
Center
is
driven
by
the

community’s
need
for
connec3vity
and
a
stronger
iden3ty.

Embracing
the
opportunity
to
create
a
true

Community
Center
formed
around
a
performing
arts
facility, 










7,750,000
 150
West
Sacramento CA Streets/Roads Reconstruc3on
of
Tower
Bridge
Gateway
(former
SR‐275):

This
project
is
part
of
the
de‐industrializa3on
of
the

City
waterfront
and
will
re‐construct
this
grade‐separated
freeway
(built
to
provide
quick/easy
access
to

downtown
Sacramento)
into
a
“front
d 










8,000,000
 160
West
Sacramento CA Streets/Roads City
Corpora3on
Yard:

The
City
of
West
Sacramento
has
experienced
a
substan3al
amount
of
growth
over
the

last
five
years.
As
a
result,
demands
for
city
services
and
facility
maintenance
have
risen
drama3cally. 








20,000,000
 200
West
Sacramento CA Streets/Roads Port
of
Sacramento
Project
Cargo
Terminal;
The
Port
of
Sacramento
is
the
closest
port
to
Solano
County
wind
areas
and
has
become
a
major
importer
of

wind
energy
equipment.

The
Port
has
lefers
of
intent
to
increase
the
shipment
of
this
cargo. 








17,500,000
 250
West
Sacramento CA Streets/Roads West
Capital
Avenue
Extension
(former
US‐40):

This
project
consists
of
construc3on
of
streetscape

improvements
in
a
one
mile
stretch
of
West
Capitol
between
Jefferson
Boulevard
and
Sycamore
Avenue.

While

maintaining
status
as
a
truck
route
and
major
artery 








20,000,000
 400
West
Sacramento CA Streets/Roads South
River
Road
Barge
Canal
Crossing
and
Village
Parkway
Extension
Project:
The
South
River
Road
Barge

Canal
Crossing
and
Village
Parkway
Extension
Project
is
a
needed
traffic
improvement
to
reduce
travel
3mes

and
accommodate
mul3‐model
travel
(transit 








32,100,000
 642
West
Sacramento CA Streets/Roads Sacramento
Deep
Water
Ship
Channel:

This
project
is
the
federally
authorized
project
proposed
by
the
US

Army
Corps
of
Engineers
to
deepen
the
Sacramento
Deep
Water
Ship
Channel
from
30
to
35
feet. 








60,000,000
 1200
City State Program Project
Descrip3on Funding
Required Jobs
West
Sacramento CA Water The
Rivers
Area
Water
Storage
Tank
and
Pump
Sta3on:

This
community
health
and
safety
project
is
planned

and
designed
to
construct
a
1.9
million
gallon
water
storage
tank
and
a
4
million
gallon
per
day
pump
sta3on

housed
in
a
masonry
building.
 










4,500,000
 90
West
Sacramento CA Water Yolo
Bypass
Levee
Deficiency
Repairs
Project:

This
community
safety
project
is
planned
and
in
the
design
and

environmental
documenta3on
stage.

The
authorized
project
involves
the
reconstruc3on
of
an
exis3ng
levee 








15,000,000
 210
West
Sacramento CA Water Main
Drain
Pump
Sta3on:
The
Main
Drain
Pump
Sta3on
project
consists
of
the
reconstruc3on
of
a
master

planned
storm
drainage
pump
sta3on
which
is
needed
to
service
the
Southport
area
of
the
City
of
West

Sacramento.
It
is
located
at
the
engineered
end
o 








16,000,000
 320
West
Sacramento CA Water Sacramento
Bypass
Area
Levee
Improvement
Project:

This
community
safety
project
is
planned
and
in
the

design
and
environmental
documenta3on
stage.

The
project
involves
the
construc3on
of
seepage
barriers
up

to
a
maximum
depth
of
110
feet
for
a
total 








23,600,000
 472
West
Sacramento CA Water The
Rivers
Area
Levee
Improvement
Project:

This
community
safety
project
is
planned
and
in
the
design
and

environmental
documenta3on
stage.

The
project
involves
the
construc3on
of
seepage
barriers
up
to
a

maximum
depth
of
110
feet
 








38,900,000
 778
West
Sacramento CA Water Sacramento
River
Bank
Protec3on
Project:

The
Sacramento
River
Bank
Protec3on
Program
is
a
currently

authorized
program.

The
project
involves
repairing
8,100
feet
of
high
priority
erosion
sites
and
5,000
feet
of

moderate
priority
erosion
sites 








40,000,000
 800
West
Sacramento CA Water Stone
Lock
Area
Levee
Improvement
Project:

This
community
safety
project
is
planned
and
in
the
design
and

environmental
documenta3on
stage.

The
project
involves
the
construc3on
of
a
setback
levee
with
a
seepage

cutoff
barrier
along
3.3
miles 








70,300,000
 1406
West
Sacramento CA Water Naviga3on
Levee
Improvement
Project:

The
Naviga3on
levee
along
the
Yolo
Bypass
is
a
federally
owned
and

maintained
facility.

There
is
approximately
60,000
feet
of
high
priority
erosion
sites
that
require
immediate

repair. 








75,000,000
 1500
Arvada CO Streets/Roads Garrison
Street
Bridge
Replacement.

Replaces
inadequate
bridge
for
street,
waterway,
and
other
public

improvements.

Project
also
removes
26
homes
from
floodway. 










1,000,000

Arvada CO Streets/Roads W.
64th
Ave.
‐
McIntyre
to
Church
Ditch.

Comple3on
of
unfinished
segment
of
major
arterial
expansion
from

two
lanes
to
four
lanes. 










1,000,000

Arvada CO Streets/Roads W.
72nd
Ave.
and
Indiana
Street
(State
HWY
72)
Interse3on
Improvements.

 












300,000

Arvada CO Streets/Roads W.
74th
Avenue
Bridge
Replacement.

Deficient,
nonstandard
bridge
in
need
of
replacement
and
also
widening

for
bike
and
pedestrian
access. 










2,300,000

Aurora CO Streets/Roads Reconstruc3on
of
the
highway
interchange
at
Interstate
225,
17th
Place
and
Colfax
Ave.

The
project
will

drama3cally
improve
access
to
the
Fitzsimons
campus
ahich
is
home
to
the
UCHSC
Health
Sciences
Center. 








50,000,000
 2000
Boulder CO CDBG Fund
installa3on
of
fire
sprinklers
in
permanently
affordable
rental
housing
units.

Nine
mul3‐family
sites,
with

a
total
of
236
unites,
do
not
have
fire
protec3on
sprinklers. 












675,000
 10
Boulder CO CDBG Mobile
home
parks
in
the
city
were
built
35‐50
years
ago
and
their
on‐site
infrastructure
is
deteriora3ng

significantly.
The
city
has
funded
the
purchase
of
two
parks
by
affordable
housing
non‐profits
and
a
par3al

infrastructure
replacement
 










1,472,000
 30
Boulder CO CDBG BHP,
the
housing
authority
for
the
city,
owns
and
manages
337
units
in
eight
public
housing
sites.


Funding

would
go
to
renovate
these
proper3es,
which
were
built
between
1955
and
1982,
with
the
majority
of
units

built
in
the
early
1970’s.
 










8,300,000
 65
Boulder CO Energy Provide
funding
to
convert
60
hybrid
electric
vehicles
to
Plug‐in
Hyrbrid
Vehicles
with
Vehicle
to
Grid

technology.

The
cars
are
part
of
the
City
of
Boulder,
Boulder
County
and
the
University
of
Colorado
fleets.

A

mix
of
onboard
V2G
technology
and
smart 










6,000,000

Boulder CO Schools Mapleton
Elementary
School
in
the
city
of
Boulder
was
built
in
1889
and
served
as
an
elementary
school
un3l

2004,
which
it
was
closed
due
to
declining
enrollment.
A
community
coali3on
has
com
together
to
convert
the

school
into
an
early
childhood
educa3on
facility 










5,400,000
 110
Boulder CO Streets/Roads Arterial
and
residen3al
reconstruc3on
projects.

ADA
sidewalk
and
access
ramp
improvements. 










7,500,000
 116
Boulder CO Transit Install
Junc3on
Place
bridge,
pathways
along
Foothills
and
from
Goose
Creek
to
bus
sta3on 










2,900,000
 116
Boulder CO Transit Install
a
400
bike
system
(40
sta3ons)
a
la
"Velib"
in
Paris,
Rejuvenate
HOP
transit
service
with
purchase
of
four

new
buses
(US
built) 










3,100,000
 124
Boulder CO Transit 30th
Street
bikeland
and
sidewalk
project,
Broadway
and
Euclid
transit
and
bike
improvements,
28th
Street

intermodal
improvements.

TableMesa
bike/ped
underpass
to
park‐n‐ride 








17,200,000
 688
Colorado
Springs CO Airport Colorado
Springs
Airport
Solar
Array
Project 








15,000,000
 50
Colorado
Springs CO Airport Colorado
Springs
Airport
Business
Park
Interchange
connec3ng
the
Defense
Access
Road
with
Airport

entry/exit
roads 








20,000,000
 100
Colorado
Springs CO CDBG Pedestrian
Bridge
Replacement,
North
Shooks
Run
Trail 














75,000

Colorado
Springs CO CDBG Pikes
Peak
Greenway
Trail
Paving,
Dorchester
Park
to
El
Pomar
Youth
Sports
Park 












495,000
 5
Colorado
Springs CO CDBG Sand
Creek
Trail
Construc3on,
Barnes
Rd
to
Stetson
Hill
Blvd 












350,000
 5
Colorado
Springs CO CDBG City
Auditorium,
Life
Safety
Improvements 












700,000
 10
Colorado
Springs CO CDBG Playground
Renova3ons
at
6
City
Parks 












350,000
 10
Colorado
Springs CO CDBG Safe
Routes
to
Schools
‐
Cresta
Road
Sidewalks
&
Pedestrian
Ramps 












110,000
 10
Colorado
Springs CO CDBG Safe
Routes
to
Schools
‐
North
Hancock
Avenue 












118,000
 10
Colorado
Springs CO CDBG West
Moreno
Street
Sidewalks 












145,000
 10
Colorado
Springs CO CDBG Meter
Data
Management
System 










2,000,000
 12
Colorado
Springs CO CDBG 30th
Street
Shoulder
Improvements
&
Bike
Lanes 










3,050,000
 15
Colorado
Springs CO CDBG Area
Revitaliza3on
‐
South
Nevada
Avenue
Infrastructure 










5,000,000
 15
Colorado
Springs CO CDBG Area
Revitaliza3on
‐
South
Academy
Blvd
Infrastructure 








10,000,000
 25
Colorado
Springs CO CDBG Citywide
Drainage
Improvements 








20,000,000
 50
Colorado
Springs CO CDBG Cofonwood
Recrea3on
Center
Gym
&
Senior
Center
Expansion 










5,200,000
 50
Colorado
Springs CO CDBG Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
Parks
&
Recrea3on 










1,402,000
 50
Colorado
Springs CO CDBG Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
U3li3es
Warehouse 










2,000,000
 75
Colorado
Springs CO CDBG Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
Fleet
Maintenance 










6,100,000
 100
Colorado
Springs CO CDBG Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
Street
Division 










5,605,000
 100
Colorado
Springs CO CDBG Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
Traffic
Engineering 










4,843,000
 125
Colorado
Springs CO Energy Wind
Turbine
for
Fire
Sta3on
21 














90,000
 5
Colorado
Springs CO Energy Energy
Retrofits
for
Other
City
Facili3es 










2,000,000
 30
Colorado
Springs CO Energy Energy
Retrofits
for
15
Fire
Sta3ons 










3,005,000
 40
Colorado
Springs CO Energy Research
Educa3on
PV
Facili3es
(6MW) 








48,000,000
 100
Colorado
Springs CO Housing Hancock
Avenue
Housing
Development 










2,500,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Colorado
Springs CO Streets/Roads Brookside
Street
Reconstruc3on 










2,000,000
 15
Colorado
Springs CO Streets/Roads Hancock
Exprressway
@
Chelton
Road
Realignment 










7,000,000
 15
Colorado
Springs CO Streets/Roads Plafe
Avenue
Widening
(from
Academy
to
Powers) 










6,000,000
 15
Colorado
Springs CO Streets/Roads Traffic
Safety
Improvements 








10,000,000
 25
Colorado
Springs CO Streets/Roads Pikes
Peak
Highway,
Erosion
and
Sedimenta3on
Control
project 








10,000,000
 30
Colorado
Springs CO Streets/Roads Vincent
Drive
Extension
‐
Woodmen
to
Nevada 








15,000,000
 30
Colorado
Springs CO Streets/Roads Centennial
Drive
Extension,
from
Fillmore
to
Fontanero 










3,000,000
 40
Colorado
Springs CO Streets/Roads I‐25
Widening
from
Academy
to
Interquest 








37,000,000
 40
Colorado
Springs CO Streets/Roads Sidewalks
and
Pedestrian
Ramps 








20,000,000
 50
Colorado
Springs CO Streets/Roads Major
Bridge
Replacements 








30,000,000
 60
Colorado
Springs CO Streets/Roads South
Metro
Accessibility
Project
(Milton
E.
Proby
Parkway)
‐
Academy
to
Powers 








60,000,000
 60
Colorado
Springs CO Streets/Roads I‐25
Widening
from
Northgate
to
Monument 








72,000,000
 75
Colorado
Springs CO Streets/Roads I‐25
Widening
from
Interquest
to
Northgate 








80,000,000
 80
Colorado
Springs CO Streets/Roads I‐25
@
Cimarron
St
Interchange 






100,000,000
 100
Colorado
Springs CO Streets/Roads I‐25
@
Fillmore
St
Interchange 








60,000,000
 100
Colorado
Springs CO Streets/Roads Local
Streets
Rehabilita3on
and
Resurfacing 








40,000,000
 100
Colorado
Springs CO Streets/Roads State
Highway
21
(Powers
Blvd)
@
Airport/Stewart
Interchange 








57,000,000
 100
Colorado
Springs CO Streets/Roads State
Highway
21
(Powers
Blvd)
@
Proby
Parkway
Interchange 








50,000,000
 100
Colorado
Springs CO Streets/Roads State
Highway
21
(Powers
Blvd)
North
‐
Complete
3
interchanges
at
Briargate,
Union
and
Old
Ranch 








45,000,000
 100
Colorado
Springs CO Streets/Roads Woodmen
Corridor
‐
Widening
&
Interchanges 






125,000,000
 100
Colorado
Springs CO Streets/Roads State
Highway
21
(Powers
Blvd)
North,
Extension
to
I‐25 






105,000,000
 200
Colorado
Springs CO Transit Purchase
16
Buses 










3,000,000

Colorado
Springs CO Transit Intermodal
Transit
Sta3on 








12,000,000
 60
Colorado
Springs CO Water Fountain
Valley
Water
Treatment
Plant
‐
Potable
Water
Mains 












500,000
 2
Colorado
Springs CO Water Low‐Impact
Development
Demonstra3on
Center
to
educate
the
public
about
decreasing
stormwater
runoff 












600,000
 2
Colorado
Springs CO Water Big
Tooth
Dam
Rehabilita3on 










1,600,000
 5
Colorado
Springs CO Water Fire
Hydrant
Install 










1,000,000
 5
Colorado
Springs CO Water Fountain
Creek
Improvements
–
Eco‐Fit
Park
for
wetland
development,
drop
structures
and
educa3on 










2,300,000
 5
Colorado
Springs CO Water Las
Vegas
Wastewater
Treatment
Plant
Disinfec3on 










2,000,000
 10
Colorado
Springs CO Water Manhole
Rehabilita3on
and
Replacement
Program 










2,450,000
 10
Colorado
Springs CO Water Fountain
Creek
Improvements
–
Clear
Springs
Ranch
for
wetlands
development,
bank
improvementsand
creek

realignment 










5,800,000
 15
Colorado
Springs CO Water Fountain
Creek
Improvements
–
Pueblo
for
sediment
removal
and
levee
reinforcement 










4,500,000
 15
Colorado
Springs CO Water Highline
Reservoir
Cover
Replacement
 










5,000,000
 15
Colorado
Springs CO Water Sand
Creek
Regional
Deten3on
Ponds 








10,000,000
 25
Colorado
Springs CO Water Sanitary
Sewer
Creek
Crossing
Program 








13,300,000
 25
Colorado
Springs CO Water Local
Collectors
Evalua3on
and
Replacement
Program 








14,300,000
 30
Colorado
Springs CO Water Sanitary
Sewer
Evalua3on
and
Rehabilita3on
Program 








10,000,000
 30
Colorado
Springs CO Water Southeast
Nonpotable
System
Extension 








15,000,000
 30
Colorado
Springs CO Water Northern
Nonpotable
System
Extension 








18,000,000
 35
Colorado
Springs CO Water Southern
Delivery
System
‐
water
delivery
pipeline,
pump
sta3on 








38,000,000
 45
Colorado
Springs CO Water Water
Main
Replacements 








12,500,000
 45
Colorado
Springs CO Water Fountain
Creek
Stabiliza3on
and
Enhancements,
Manitou
Springs
to
Sand
Creek 








20,000,000
 50
Colorado
Springs CO Water Cofonwood
Creek
Stabiliza3on
and
Deten3on 








50,000,000
 100
Denver CO Public
Safety Opera3onal
Safety:
Upgrade
Traffic
Signal
Control
Systems 










3,000,000
 17
Denver CO Public
Safety Opera3onal
Safety:
Safety
Improvements
at
15
Intersec3ons
(Signal
Replacement) 










3,600,000
 20
Denver CO Public
Safety Opera3onal
Safety:
Smart
Meter
parking
meter
replacement 










4,000,000
 22
Denver CO Transit Enhancement‐‐Bike
and
Pedestrian:
Alameda
to
Broadway
Bikeway
(Alameda
LRT
Sta3on
to
Broadway
LRT

Sta3on) 












750,000
 4
Denver CO Transit Enhancement‐‐Bike
and
Pedestrian:
Bike
Sta3on
at
Denver
Union
Sta3on
Transit
Hub 










1,000,000
 6
Denver CO Transit New
Transporta3on
Construc3on:
56th
Avenue,
Quebec
thru
Havana
Transi3on 










3,000,000
 17
Denver CO Transit Transporta3on
Reconstruc3on:
Alameda
Avenue
(University
of
Cherry
Creek
on
south
side
of
Cherry
Creek) 










3,000,000
 17
Denver CO Transit Enhancement‐‐Bike
and
Pedestrian:
West
Alameda/RR
Underpass
(ADA
and
bike
improvements,
and

rehabilita3on
of
structure) 










5,000,000
 28
Denver CO Transit Transporta3on
Reconstruc3on:
Cherry
Creek
Drive
South
(Alameda
to
Colorado
Blvd.) 










7,000,000
 39
Denver CO Transit Transit
Support
Project:
16th
Street
Mall
Reconstruc3on 








16,000,000
 90
Denver CO Transit Transporta3on
Reconstruc3on:
South
Broadway
(Iowa
to
Asbury) 








17,000,000
 95
Denver CO Transit New
Transporta3on
Construc3on:
Federal
Blvd.
(7th
to
Holden
Place) 








20,600,000
 115
Denver CO Transit Transit
Support
Project:
Downtown
Circula3on
Infrastructure 








25,000,000
 140
Denver CO Transit New
Transporta3on
Construc3on:
Broadway/I‐25
Interchange
Improvements 








38,000,000
 213
Denver CO Transit New
Transporta3on
Construc3on:
Central
Park
Blvd
Interchange 








50,000,000
 280
Denver CO Transit Transit
Support
Project:
Denver
Union
Sta3on

*Number
of
jobs
created
based
on
EPS
study.
This
number
is
the
annual
average
over
years
2009‐2013 








88,000,000
 1190
Denver CO Water Cri3cal
Stormwater
Conveyance
Projects:
Wolff
Street
Bridge
over
Lakewood
Gulch 










1,500,000
 8
Denver CO Water Cri3cal
Stormwater
Conveyance
Projects:
Florida
Ouzall
Extension 










3,500,000
 20
Denver CO Water Cri3cal
Stormwater
Conveyance
Projects:
Cherry
Creek
North
Ouzall 










4,000,000
 22
Denver CO Water Cri3cal
Stormwater
Conveyance
Projects:
Park
Hill
Pond 










5,500,000
 31
Denver CO Water Cri3cal
Stormwater
Conveyance
Projects:
14th
and
Stout
Storm
Drain 










6,200,000
 35
Denver CO Water Cri3cal
Stormwater
Conveyance
Projects:
Bayaud
Ouzall 










6,200,000
 35
Denver CO Water Cri3cal
Stormwater
Conveyance
Projects:
Large
Pipe
and
Manhole
Rehab 








10,000,000
 56
Denver CO Water Cri3cal
Stormwater
Conveyance
Projects:
Montclair
Ouzall 








20,000,000
 112
Durango CO Airport Airport
Terminal
Roadway
Reconstruc3on
Project‐This
project
will
replace
the
terminal
roads
that
are
currently

in
very
poor
shape
and
are
failing.

Included
in
the
project
are
best
management
prac3ces. 










1,300,000
 130
Durango CO Energy Historic
Library
Remodel
‐
Aber
105
years,
Durango’s
public
library
has
moved
to
a
new
loca3on,
leaving

behind
a
historic
building
with
old,
inefficient
systems.

The
City
of
Durango
owns
the
building
and
would
like

to
remodel
the
building
for
City
offices. 










3,400,000
 340
City State Program Project
Descrip3on Funding
Required Jobs
Durango CO Energy Regional
Materials
Recycling
Facility
‐
Durango’s
exis3ng
recycle
center
is
14
years
old
and
has
become

insufficient
to
handle
the
amount
and
type
of
materials
the
community
recycles.

 








15,000,000
 1500
Durango CO Streets/Roads Railroad
Crossings
at
32nd
Avenue
‐
This
project
will
replace
the
current
tradi3onal
crossing
at
32nd
Avenue

with
a
crossing
made
from
recycled
materials
that
is
safer
for
both
pedestrians
and
bicyclists. 












250,000
 25
Durango CO Streets/Roads Accessible
Sidewalks
‐
Construc3ng
accessible
sidewalks
along
Main
Avenue
from
14th
Street
to
37th
Street
in

Durango
would
allow
consistent
and
improved
access
to
the
businesses
along
Main
Avenue.

Few
of
the

intersec3ons
have
sidewalk
ramps
at
this
3me. 












900,000
 90
Durango CO Streets/Roads Traffic
Signals
‐
This
project
includes
the
reconfigura3on
or
installa3on
of
new
traffic
signals
to
improve
traffic

flow
at
highly‐congested
areas
of
Durango.

Included
in
the
project
are
plans
to
incorporate
bike‐
and

pedestrian‐friendly
features 










2,400,000
 240
Durango CO Streets/Roads Sidewalk
Replacement
in
Historic
Downtown
‐
Deteriorated
sidewalks
in
historic
downtown
Durango
have
been

iden3fied
in
the
Downtown
Vision
Plan
as
a
priority
project.

In
addi3on
to
replacing
the
sidewalks,
the
project

includes
installing
street
furnitu 










3,000,000
 300
Durango CO Streets/Roads SMART
160
Mul3‐modal
Trail
‐
U.S.
Highway
160
is
the
only
east‐west
highway
through
La
Plata
County
and
has

long
been
an
impediment
to
safe
travel
for
bicyclists
and
pedestrians
due
to
the
high
traffic
volumes
and

speed.
 










8,000,000
 800
Durango CO Streets/Roads Florida
Road
Improvements
‐
Plans
for
widening
this
busy
arterial
road
include
the
installa3on
of
curb,
gufers,

sidewalks,
bike
lanes,
pedestrian
crossings,
medians,
landscaping,
streetlights,
storm
drains,
and
other
safety

improvements
 








15,500,000
 1550
Durango CO Transit Downtown
Parking
Garage
‐
This
224,000‐square‐foot
parking
garage
would
provide
adequate
mul3‐modal

parking
to
afract
development
to
downtown
Durango.

The
garage
will
be
constructed
in
conjunc3on
with
the

new
regional
transit
center
(already
under
construc3on) 








12,700,000
 1270
Durango CO Water Storm
Water
Pre‐treatment
‐
The
City
of
Durango
currently
maintains
57
storm
drain
pipelines
that
collect

storm
water
from
throughout
the
city’s
roadway
system.
Sediment
and
hydrocarbons
are
washed
from
the

roadway
surface
into
the
storm
drains 










3,420,000
 340
Englewood CO CDBG Sidewalk
missing
links
program.

Provide
for
sidewalks
in
areas
of
the
City
in
which
sidewalks
are
not
present.


The
majority
of
these
are
located
in
low
income
areas
and
serve
transit
connec3ons
and
the
Alterna3ve
High

School. 












130,000
 10
Englewood CO CDBG South
Broadway
ornamental
ligh3ng
and
median
landscape
renova3on.
Provide
for
the
replacement
of

deteriorated
street
median
landscaping
and
obsolete
and
malfunc3oning
ornamental
ligh3ng
in
the
historic

downtown
district
on
South
Broadway.
The
Business 












900,000
 30
Englewood CO Public
Safety Digital
Interface
Police/Court
case
Management
System 














37,500

Englewood CO Public
Safety Evidence
tracker
sobware 














60,000

Englewood CO Public
Safety Fire
SCBA
‐
Self‐Contained
Breathig
Apparatus
replacement.

Replace
end‐of‐useful
life
SCBA
equpment
and

mobil
servicing
vehicle. 












300,000

Englewood CO Public
Safety Mobile
Data
Terminal
replacement‐
replacement
of
obsolete
mobile
data
terminals 












100,000

Englewood CO Public
Safety Tac3cal
vests
for
SWAT
team 














55,000

Englewood CO Streets/Roads Bridge
rehabilita3on
program.

Con3nua3on
of
annual
program
for
rehabilita3on
of
bridges
as
iden3fied
by
the

Colorado
Department
of
Transporta3on
2008
bridge
inspec3on
program. 












140,000
 5
Englewood CO Streets/Roads Concrete
replacement
program.

This
project
is
the
annual
sidewalk,
curb
and
gufer
replacement
program
for

the
City
and
funding
of
this
project
is
matched
by
property
owners
through
an
annual
concrete
u3lity
fee.
 












268,000
 20
Englewood CO Streets/Roads Street
rehabilita3on
program‐upgrade
of
City
street
infrastructure.

This
is
a
con3nua3on
of
4
year
project

ini3ated
in
2006,
but
discon3nued
due
to
lack
of
funding.

Street
system
infrastructure
is
over
50
years
old
and
 












920,000
 20
Englewood CO Streets/Roads South
Broadway
Median
extension.

Con3nua3on
of
traffic
median
program
ini3ated
in
2000
with
a
federally

funded
project
and
extended
with
a
second
federally
funded
project
in
2008.

This
project
would
complete
the

medians
throughout
the
City
 










2,000,000
 30
Englewood CO Transit Purchase
two
25
passenger,
handicap
accessible
buses
for
intercity
transit
service
(Art
Shufle) 














90,000

Englewood CO Transit Bates
Avenue
Light
Rail
Sta3on
‐
city
share
of
new
light
rail
sta3on.
Denver
Regional
Transporta3on
District
is

funding
1/3
of
cost,
which
is
currently
in
place.

This
project
will
allow
for
redevelopment
of
former

foundry/brownfield
site
remedia3on 










7,200,000
 120
Englewood CO Water Water
system
security
vulnerablility
assessment
upgrades 














25,000
 1
Englewood CO Water Water
pumping
transformer
replacement. 












106,000
 2
Englewood CO Water Sanitary
sewer
main
replacement‐
replacement
of
aged
sewer
lines‐2
year
planned
replacement 












200,000
 3
Englewood CO Water Storm
water
line
replacement
‐
replacement
of
storm
water
lines
‐
2
year
replacement
program 












200,000
 4
Englewood CO Water Elevated
tanks
and
pipe
rehabilita3on 












423,000
 5
Englewood CO Water Pipe
City
Ditch
(open
water
delivery
ditch)
in
southern
areas
of
City. 












300,000
 6
Englewood CO Water Replace
roof
of
Water
Treatment
Plant 












500,000
 8
Englewood CO Water Hampden
Avenue
16"
Water
Main
replacement 












500,000
 10
Englewood CO Water Water
main
replacement
‐
replacement
of
aged
water
mains
‐
2
year
planned
replacement
program 












300,000
 10
Englewood CO Water West
Union
Avenue
16"
Water
Main
replacement. 












500,000
 10
Englewood CO Water Water
storage
tank
rehabilita3on.
Rehabilita3on/valve
replacement
of
the
City's
three
water
storage
tanks. 










1,000,000
 15
Greeley CO Public
Safety Fire
Sta3on
No.
2
replacement 










4,228,735

Greeley CO Public
Safety Fire
Sta3on
No.
3
replacement 










3,880,265

Greeley CO Public
Safety Public
Safety/Government
Training
Facility 








17,373,010

Greeley CO Streets/Roads 20th
St
from
71st
to
83rd
Ave
widening 










5,168,180

Greeley CO Streets/Roads 23rd
Ave
and
4th
St
intersec3on
reconstruc3on 










1,611,360

Greeley CO Streets/Roads 9th
and
10th
Streets
at
23rd
Ave
reconstruc3on 










3,100,000

Greeley CO Streets/Roads North
11th
Ave
from
2nd
to
D
St
widening 










2,251,725

Greeley CO Water Ammonia
removal
project 










3,677,700

Greeley CO Water Bellvue
transmission
pipeline 








37,609,900

Lakewood CO CDBG Clements
Community
Center
‐
HVAC
System
Replacement 












200,000
 6
Lakewood CO CDBG Clements
Community
Center
‐
Roof
Replacement 












250,000
 10
Lakewood CO Streets/Roads Jewell
Ave
between
Union
and
Kipling
‐
Upgrade
guard
rail 














10,000
 12
Lakewood CO Streets/Roads Linda
Vista
Dr
and
Nelson
Ct
‐
Upgrade
guard
rail,
both
sides 














10,000
 12
Lakewood CO Streets/Roads Linda
Vista
Dr
and
Newcombe
Wy
‐
Upgrade
guard
rail,
both
sides 














10,000
 12
Lakewood CO Streets/Roads Estes
Street
over
Bear
Creek
‐

Upgrade
bridge
railing 














20,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Lakewood CO Streets/Roads Kentucky
over
Weir
Gulch
‐

Install
bridge
railing 














25,000
 15
Lakewood CO Streets/Roads Kipling
St
and
Wesley
Ave
‐
Guard
rail
installa3on 














35,000
 15
Lakewood CO Streets/Roads Garrison
Street,
Alameda
Avenue
to
Jewell
Avenue
‐

Repair
of
curb,
gufer,
sidewalk,
asphalt
overlay
of
pavement,
in
laid
long
life
striping 












900,000
 20
Merino CO Water Water
System
Improvements,
New
Well
and
Distribu3on
Lines 










1,600,000
 160
Merino CO Water Wastewater
Collec3on
Treatment
System
Improvements 










3,134,000
 313
Rico
 CO Water Waste
Water
Improvement 








10,000,000
 200
Thornton CO CDBG Streetscape
Improvements 












800,000
 8
Thornton CO CDBG Park
Village
Pool
Rehabilita3on 












389,000
 10
Thornton CO CDBG Local
Street
Rehabilita3on 










1,650,000
 16
Thornton CO CDBG Carpenter
Rec
Center/Thornton
Trail
Winds
Park
&
Open
Space 










8,000,000
 80
Thornton CO Energy City
Building
energy
efficiency
improvements 










1,006,189
 10
Thornton CO Public
Safety Crime
Analyst 












107,000
 1
Thornton CO Public
Safety K‐9
(canine)
Team 












306,986
 1
Thornton CO Public
Safety High
Density
Housing
Crime
Preven3on/Enforcement
Unit 










1,065,500
 4
Thornton CO Public
Safety Fire
Sta3on
#5 










6,000,000
 60
Thornton CO Streets/Roads Washington
St
Bridge
at
153rd 










1,600,000
 16
Thornton CO Streets/Roads Washington
St
Bridge
at
160th 










1,600,000
 16
Thornton CO Streets/Roads 128th
Ave:
Washington
to
I‐25 










2,020,000
 20
Thornton CO Streets/Roads 136th
Ave:
Cherry
to
Holly 










2,800,000
 28
Thornton CO Streets/Roads 144th
Ave:
Colo
to
Holly 










6,000,000
 60
Thornton CO Streets/Roads 152nd
Ave:
Colorado
to
Holly 










6,000,000
 60
Thornton CO Streets/Roads Sack
Creek
Drainage
Phase
2 










6,000,000
 60
Thornton CO Streets/Roads Shay
Ditch
Drainage 










6,000,000
 60
Thornton CO Streets/Roads Holly
Street:
123rd
to
128th 










6,200,000
 62
Thornton CO Streets/Roads Mustang
Run
Drainage 










8,000,000
 80
Thornton CO Streets/Roads 144th
Ave:
UPRR
to
Colo
Blvd 










9,700,000
 97
Thornton CO Streets/Roads Washington
St
widen
over
E‐470 








11,000,000
 110
Thornton CO Streets/Roads Holly
Street:
144th
to
HW‐7 








12,000,000
 120
Thornton CO Streets/Roads 144th
Ave:
Wash
to
UPRR 








12,500,000
 125
Thornton CO Streets/Roads 104th
Ave:
Colo
Blvd
to
Plafe
River 








16,000,000
 160
Thornton CO Streets/Roads Quebec
Interchange
at
E‐470 








16,000,000
 160
Thornton CO Streets/Roads Quebec
Improvements
to
HW‐7 








18,000,000
 180
Thornton CO Streets/Roads 128th
Avenue
Interchange
at
I‐25 








21,000,000
 210
Thornton CO Streets/Roads 84th
Avenue/I‐25
Interchange 








25,000,000
 250
Thornton CO Streets/Roads Colo
blvd:
144th
to
HW‐7 








25,000,000
 250
Thornton CO Streets/Roads Colo
Blvd:
91st
to
I‐76 








60,000,000
 600
Thornton CO Transit Grade
Separa3on
at
136th
Ave/York/North
Metro
Rail
Line 








40,000,000
 490
Thornton CO Water Big
Dry
Creek
Parallel
Sewer 










3,000,000
 30
Thornton CO Water Biological
Nitrate
Removal
Facility 










9,500,000
 95
Thornton CO Water Zone
One
Potable
Waterline 








10,200,000
 100
Thornton CO Water Raw
Water
return
pipeline
and
pump 








17,000,000
 170
Thornton CO Water Water
Treatment
Plant
Expansion 








22,500,000
 225
Thornton CO Water West
Sprat
Expansion 








26,000,000
 260
Thornton CO Water Wheeling
Plan
Implementa3on 








67,773,000
 677
Bridgeport CT Airport Airport
Garage
Repair
and
Rehabilita3on 












400,000
 8
Bridgeport CT CDBG Regional
Network
of
Programs
Renova3ons 














50,800
 3
Bridgeport CT CDBG Washington
Park
Revitaliza3on
Corpora3on
Renova3on
Project
for
Alpha
Community
Services
 














55,575
 3
Bridgeport CT CDBG Boys
&
Girls
Village
Renova3on
Project
(170
Bennef
Street) 












100,000
 4
Bridgeport CT CDBG Bridgeport
Area
Youth
Ministry
Facade
Upgrade
&
addi3onal
of
2
HVAC
units
to
Industrial
Youth
Center 














75,000
 4
Bridgeport CT CDBG Center
for
Women
&
Families
Capital
Improvements
at
City's
Safe
House
for
bafered
women
&
children 












100,000
 4
Bridgeport CT CDBG Roberto
Clemente
Condominiums
Repairs
Project 












300,000
 4
Bridgeport CT CDBG The
Bridgeport
Gateway
COOP
Inc.

Replacement
of
Central
Boiler
System 












300,000
 4
Bridgeport CT CDBG Wenzield
Bathrooms
Structure
(Park
Improvements,
design
and
planning
complete)
 












234,000
 4
Bridgeport CT CDBG Fire
Company
6/8
Repairs
(Roof
Repair
and
upgrade)
 












645,000
 6
Bridgeport CT CDBG Public
Safety
Camera
System
designed
for
regional
transporta3on
hubs
and
high‐crime
neighborhoods
 












300,000
 6
Bridgeport CT CDBG Stone
Ridge
II
Roof
Replacement
Project 












250,000
 6
Bridgeport CT CDBG West
Side
Police
Precinct
Rehab
Project 












500,000
 6
Bridgeport CT CDBG William
Street
Condo
site
work 














35,000
 6
Bridgeport CT CDBG Wheeler
Fountain
Restora3on
Project
(Plumbing,
sitework
and
paving/
design
complete)
 












855,939
 7
Bridgeport CT CDBG Bridgeport
Parks
Department
Luis
Marin
Park
Recrea3onal
Enhancements
/
Water/
Splashpad
Playground
with

landscape
furnishings
 














75,000
 8
Bridgeport CT CDBG Charles
D.
Smith
Founda3on
(Interior
repairs,
fencing
&
HVAC
installa3on
of
community
facility
in
East
End)

 












200,000
 8
Bridgeport CT CDBG Hall
Neighborhood
House
HVAC/
Furnace
Boiler
System
Repair 












350,000
 8
Bridgeport CT CDBG McGivney
Center
Interior
Renova3on
Project
(Repair,
Roofing
&
Build
out
of
Teen
Center
Space)
 












750,000
 8
Bridgeport CT CDBG Senior
Center
Repairs
and
Renova3ons
(Black
Rock
and
Eisenhower
Center)
 












565,000
 8
Bridgeport CT CDBG United
Cerebral
Palsy
Center
Expansion
of
lower
level
MATC
/
2326
East
Main
Street
 














75,000
 8
Bridgeport CT CDBG Cardinal
Shehan
Center
Safety
&
Energy
Conserva3on
Project 










1,101,748
 10
Bridgeport CT CDBG Fire
Company
12
Roof
and
Facility
Repairs 










1,000,000
 10
Bridgeport CT CDBG Fire
Company
3/4
Wood
Avenue
Repairs
and
Renova3ons
(Roof
Repair)
 












850,000
 10
Bridgeport CT CDBG Marrakech,
Inc.
Renova3on
Project
of
Senior
Center
&
Affordable
Housing
Units 










1,654,351
 10
Bridgeport CT CDBG Parks/
BAYSO
ACF
Soccer
Fields
‐
Construc3on
of
2
new
fields
Seaside
Park,
resurface
Kennedy
&
Hedges

Stadium 










1,000,000
 10
Bridgeport CT CDBG YMCA
South
End
Community
Center
Rehabilita3on
Project
 










1,000,000
 12
Bridgeport CT CDBG Animal
Shelter
Expansion
(to
increase
capacity
for
housing
of
animals/
design
complete)
 












700,000
 14
City State Program Project
Descrip3on Funding
Required Jobs
Bridgeport CT CDBG Bridgeport
Police
Ac3vi3es
League
Recrea3on
and
Educa3on
Center 










3,750,000
 15
Bridgeport CT CDBG East
Side
Police
Precinct
Construc3on
Project
to
house
police
and
community
services
 










5,000,000
 16
Bridgeport CT CDBG Police
Vehicle
Storage
Building
for
Emergency
Services
Unit
and
specialized
and
undercover
vehicles 










4,000,000
 16
Bridgeport CT CDBG The
Marrionville
Co‐ops
Landscaping,
Fencing,
EnergyImprovements
and
HVAC
repairs,
security
gates,
window

repairs,
exterior
stucco
repairs/sealing 












850,000
 16
Bridgeport CT CDBG Bridgeport
Fire
Department
Engine
15
&
7/11
Repairs 










1,355,000
 20
Bridgeport CT CDBG Bridgeport
Fire
Department
Headquarters
Repairs
 










1,525,000
 20
Bridgeport CT CDBG McLevy
Hall
Government
Building
Renova3ons
and
Roof
Repair 










2,000,000
 20
Bridgeport CT CDBG Sand
Salt
Building
‐
Construc3on
of
new
shed
(design
complete,
planning
complete) 












750,000
 20
Bridgeport CT CDBG Seaview
Industrial
Park
(Site
improvements
project
contract
#5) 










1,500,000
 20
Bridgeport CT CDBG Upgrading
water,
sewer,
and
storm
drains
at
the
former
Pequonnock
Village
and
Marina
Apartments
public

housing
site
to
enable
the
reconstruc3on
of
mixed
use
project
on
sites 










3,500,000
 23
Bridgeport CT CDBG Installa3on
of
sewer
in
Mar3n
Luther
King
Drive
at
the
site
of
the
Father
Panik
Village
public
housing
site
to

enable
reconstruc3on
on
the
site 










4,250,000
 26
Bridgeport CT CDBG Barnum
Museum
Renova3on
and
Restora3on
Project
(interior
structural
repair,
environmental
upgrade)
 










1,100,000
 30
Bridgeport CT CDBG City
Hall
Repairs
and
Renova3ons 










2,100,000
 30
Bridgeport CT CDBG Citywide
Library
Renova3on
&
Repair
Projects
(Roof
Repair
for
Main
Library)
 










3,950,000
 35
Bridgeport CT CDBG Wonderland
of
Ice:
Interior
Renova3ons
and
Code
Upgrades 










1,500,000
 35
Bridgeport CT CDBG Bridgeport
Fire
Department
Training
Facility
(Renova3on
of
2
exis3ng
buildings
&
construc3on
of
4
story
tower

with
burn
building/
site
assembled,
design
complete) 










3,750,000
 40
Bridgeport CT CDBG Installa3on
of
City‐wide
Broadband
Network
for
Community
and
Municipal
Use 








20,000,000
 44
Bridgeport CT CDBG Bridgeport
Police
Department
Narco3cs
&
Vice
Facility
Building
(renova3on
of
building,
site
assembled,
design

complete)
and
Police
Evidence
Center 










3,430,000
 50
Bridgeport CT CDBG Police
Department
Headquarters
Renova3on
&
Upgrade 










1,375,000
 50
Bridgeport CT CDBG Port
Authority
Ferry
Garage
Construc3on
Project
(Planned
phase
of
intermodal
transporta3on
center
project/

transit
oriented
development
/
design‐phase
completed,
site
assembled,
project
planning
complete)
–

Es3mated
Cost:
$4
million 










4,000,000
 80
Bridgeport CT CDBG Public
Facili3es
Administra3on
Building
/
Maintenence
Garage
Recycling
and
Sanita3on
Truck
Wash 








27,080,000
 120
Bridgeport CT CDBG City
Hall
Annex
Repairs
and
Renova3ons
(Roof
Repair)
 










4,070,000
 200
Bridgeport CT CDBG Hurricane
Barriers
&
Flood
Control
Gates
Installa3on
Project 








20,000,000
 200
Bridgeport CT CDBG Steel
Point
Development
Infrastructure,
Shoreline
Replacement
Project
(Shoreline
replacement,
new
bulk‐head

construc3on
at
Steel
Point
Development
site,
this
mixed‐use
development
project
on
a
50
plus
acre
waterfront

parcel
is
the
largest
waterfront
deve 








20,000,000
 275
Bridgeport CT CDBG Demoli3on
and
Remedia3on
of
City
Property 








50,000,000
 300
Bridgeport CT CDBG Steel
Point
Development
Street
&
U3lity
Improvements
(site
assembled,
design
complete)
 








38,312,550
 400
Bridgeport CT Energy LED
Traffic
Light
Conversion
Project
 












400,000
 4
Bridgeport CT Energy Barnum/Knowlton
Urban
Access
Project
 










1,000,000
 10
Bridgeport CT Energy Seaview/Central
Urban
Access
Water
Front
Project 










1,000,000
 10
Bridgeport CT Energy Deforest/Johnson’s
Creek
Water
Front
Project 










2,600,000
 11
Bridgeport CT Energy Energy
improvements
to
Administra3ve
Offices 










1,500,000
 22
Bridgeport CT Energy Emergency
Center
Electrical
Genera3on
Project
‐
Fuel
Cell
&
Generator
Purchase
&
Installa3on
 








15,275,000
 30
Bridgeport CT Energy Up‐Grades
to
Neighborhood
Parks/infrastructure
Improvements
Washington
Park
which
is
in
a
Historic
District,
Nanny
Goat
Park,


Upchurch
Park
and
Newfield
Park 










4,200,000
 38
Bridgeport CT Energy Bridgeport
School
System
&
City
Public
Facili3es
Efficiency
Retrofit
Project 








15,000,000
 70
Bridgeport CT Energy Enviornmental
Remedia3on
Projects
for
Neighborhood

Development
Ini3a3ves
and
Waterfront
Clean‐up 










8,300,000
 150
Bridgeport CT Energy East
Side
&
West
Side
Treatment
Plant
Waste
to
Energy
Biomass
Gassifica3on
Energy
Produc3on
Project 








65,000,000
 560
Bridgeport CT Energy City
of
Bridgeport
Government
Center
LEEDS
building
for
Health,
Probate,
Government,
Senior
Center,
and

Library 






100,000,000
 600
Bridgeport CT Housing Addi3on
of
funding
for
200
Coleman
Street
LEEDS
construc3on
of
3
public
housing
units 














50,000
 1
Bridgeport CT Housing Poplar
Street
public
housing
project
elevator
replacement 












125,000
 2
Bridgeport CT Housing Charles
Greene
security
ligh3ng 












175,368
 3
Bridgeport CT Housing Restora3on
of
retaining
walls
and
fencing
at
Trumbull
Gardens 












226,321
 4
Bridgeport CT Housing Iranistan
Ave
building
rehabilita3on
into
public
housing
units 












437,373
 6
Bridgeport CT Housing PT
Barnum
security
ligh3ng 












434,373
 6
Bridgeport CT Housing Storm
doors
at
various
public
housing
sites 












400,000
 6
Bridgeport CT Housing Fireside
electrical
meter
upgrades 












480,000
 7
Bridgeport CT Housing Installa3on
of
bus
shelters
at
PT
Barnum,
Fireside
Court,
CF
Greene,
Harborview
Village,
and
Marina
Village 












265,000
 7
Bridgeport CT Housing Telecommunica3ons
and
sobware
update 












500,000
 7
Bridgeport CT Housing Vacancy
reduc3on
in
unoccupied
units 












550,000
 8
Bridgeport CT Housing Harborview
security
modifica3ons
and
front
entrance
repairs 












605,000
 9
Bridgeport CT Housing Trumbull
Gardens
building
11
elevators
repairs 












650,000
 10
Bridgeport CT Housing Charles
Greene
public
housing
new
roofs 












725,000
 11
Bridgeport CT Housing Adams
and
Olive
Street
building
restora3on 












875,156
 13
Bridgeport CT Housing Marina
Village
security
ligh3ng 












941,653
 14
Bridgeport CT Housing Sidewalk
improvements
at
Marina
Village 












650,000
 14
Bridgeport CT Housing Gary
Crook
Center
moderniza3on
and
consolida3on
of
offices 










1,032,000
 15
Bridgeport CT Housing Renova3on
of
vacated
building
into
housing
units
for
survivors
of
domes3c
violence 










2,446,861
 16
Bridgeport CT Housing 14
units
of
new
housing
construc3on
on
exis3ng
founda3on 










4,000,000
 18
Bridgeport CT Housing Marina
Village
public
housing
project
replacement
roofs 










1,251,625
 18
Bridgeport CT Housing Reconfigura3on
of
Bird
Street 










1,675,000
 18
Bridgeport CT Housing Replacement
of
siding
and
storm
water
handling
system
at
Trumbull
Gardens 










1,256,332
 18
Bridgeport CT Housing Site
improvement
to
Morris
Ave
and
construc3on
of
warehouse 










1,350,000
 18
Bridgeport CT Housing CCTV
System
wide 










1,523,668
 22
City State Program Project
Descrip3on Funding
Required Jobs
Bridgeport CT Housing Replacement
of
roofs
at
the
Scafered
Site
projects 










1,500,000
 22
Bridgeport CT Housing Trumbull
Gardens
sewer
system
reconstruc3on 










1,500,000
 22
Bridgeport CT Housing Windows
for
housing
at
Fireside
Court
elderly
housing
and
Scafered
Sites
536
units. 










1,500,000
 22
Bridgeport CT Housing Construc3on
of
health
clinic
on
Albion
Street 










4,650,775
 23
Bridgeport CT Housing Charles
Greene
interior
stairs
replacement 










1,600,000
 24
Bridgeport CT Housing Windows
at
Harborview
Village
apartments 










2,071,561
 30
Bridgeport CT Housing Sec3on
504
site
and
common
area
infrastructure
rehabilita3on 










3,000,000
 32
Bridgeport CT Housing 755
Plaisades
Ave
clinic 










2,300,000
 34
Bridgeport CT Housing New
boilers
at
Fireside
Court
elderly
apartments 










2,754,800
 40
Bridgeport CT Housing ADA
renova3ons
to
stairways,
sidewalks,
parking
areas,
fencing,
etc. 










3,500,000
 42
Bridgeport CT Housing PT
Barnum
stairs
replacement 










3,098,920
 46
Bridgeport CT Housing New
boilers
at
536
Scafered
Site
units 










3,200,000
 47
Bridgeport CT Housing PT
Barnum
streets
and
sidewalks
replacement 










3,500,000
 51
Bridgeport CT Housing Kitchen
moderniza3ons
in
PT
Barnum,
Trumbull
Gardens,
Harborview,
and
CF
Greene 










3,750,000
 55
Bridgeport CT Housing Burroughs
Community
Center
Expansion
 










3,000,000
 60
Bridgeport CT Housing Sec3on
504
unit
retrofit
in
all
projects 










4,128,104
 60
Bridgeport CT Housing Housing
Preserva3on
Projects‐
For
Owner
occupied
and
historic
district
proper3es. 










2,600,000
 100
Bridgeport CT Public
Safety Expansion
of
City's
Video
Monitoring
System 










3,000,000
 6
Bridgeport CT Public
Safety Expansion
of
Emergency
Services
Unit 










3,000,000
 12
Bridgeport CT Public
Safety City‐wide
Public
Safety
Mesh
Wireless
Network
 










5,000,000
 15
Bridgeport CT Public
Safety School
Resource
Officers
and
Neighborhood
Policing
Officers
to
Support
Community
Policing
Ini3a3ves 








22,500,000
 90
Bridgeport CT Schools Replace
roofs
at
Bassick
High
School
and
the
Maintenance
Garage

 










2,400,000
 20
Bridgeport CT Schools Replace
plumbing
fixtures
and
mixing
valves
in
Winthrop,
Bassick,
Roosevelt,
Whiqer
schools.

 












350,000
 30
Bridgeport CT Schools Columbus
energy
efficiency
renova3ons
to
include
Window
replacement
and
HVAC
upgrades


 










6,500,000
 50
Bridgeport CT Schools Upgrade
HVAC
System
to
include
energy
efficient
Boilers
and
air
handling
units.

Schools
include
Curiale,

Central,
Whiqer,
Sheridan,
Marin,
Park
City,
JFK.

 










2,800,000
 50
Bridgeport CT Schools Upgrade
electrical
systems
to
meet
current
Technology
requirements
within
the
schools.
School
include:

Hallen,
Longfellow,
Madison
Harding
Wintrop,
Blackham,
Bearsdley,
Whiqer.

 










1,195,000
 70
Bridgeport CT Schools Replace
Doors
and
Windows.

Exis3ng
Windows
and
doors
need
to
be
upgraded
to
thermopane
units
and

replace
old
corroded
doors
at
Blackrock,
Blackham,
Beardsley,
Central,
Cross,
Harding,
Hallen,
Longfellow,
Park

City,
Skane
and
Bassick
Schools

 










6,990,000
 75
Bridgeport CT Schools Replace
Hea3ng
Controls
systems
in
Blackrock,
Beardsley,
Edison,
Hallen,
Blackham,
Hooker,
JFK
Campus
High

Horizon,
Mul3
Cultural,
Read,
Roosevelt,
Whiqer
and
Wintrop
Schools 










4,000,000
 75
Bridgeport CT Schools Columbus
ADA
Renova3ons.

Renovate
and
exis3ng
Elementary
School
to
meet
ADA
Code
requirements 










8,850,000
 300
Bridgeport CT Schools Auxiliary
Classrooms
at
Central
High
School
to
provide
addi3onal
teaching
space
to
meet
the
accredita3on

issues
within
the
high
school.

This
project
would
provide
relief
from
the
exis3ng
over
crowding
situa3on
 










2,750,000
 400
Bridgeport CT Schools Provide
local
funding
to
construct
a
Discovery
magnet
School.

This
facility
is
70,000
sf
with
500
students.

This

school
will
operate
in
conjunc3on
witht
he
Discovery
Museum. 










3,050,000
 600
Bridgeport CT Schools Provide
local
funding
for
the
new
210,000
sf
Mul3
Magnet
High
School
to
aid
in
over
crowding
and
provide
a

facility
that
is
environmentally
sound
and
matches
the
curriculum.

The
curriculum
includes
infroma3on

Technology,
Zoology,
and
Aerospace
programs 








12,300,000
 850
Bridgeport CT Streets/Roads East
Washington
Bridge
Repair
Project
(Maintenance
Repairs)
 












130,000
 8
Bridgeport CT Streets/Roads Citywide
Traffic
Signal
Replacement
Project
 










5,900,000
 20
Bridgeport CT Streets/Roads Downtown/South
End
Streetscape
Connector:
Es3mated
cost:
$3,
527,444.70
This
project
incorporates
two
separate,
but
related
ini3a3ves
to
connect
the
South
End,
Arena,
Ballpark,
Ferry,

Warnaco
Housing
and
future
High
Speed
Ferry
with
the
Downtown
Centr 










3,527,444
 40
Bridgeport CT Streets/Roads Neighborhood
Side
Walk/infrastructure
Improvement
Projects‐
Hollow/Madison
Av/
Street
Scape
Improvement
Project
East
Side
Improvement
Project‐
West
Side
Street
Scape
Improvement
Project
South
End
Iranistan
and
Street
improvements
 










8,500,000
 43
Bridgeport CT Streets/Roads Bridgeport
City‐wide
Sidewalk
Reconstruc3on
and
Installa3on
Project
 








22,000,000
 50
Bridgeport CT Streets/Roads Capital
Avenue
Bridge
Rehabilita3on
 










1,000,000
 50
Bridgeport CT Streets/Roads Main
Street
Streetscape
Phase
#1
Woodside
to
Trumbull
Mall
 










8,500,000
 60
Bridgeport CT Streets/Roads Main
Street
Streetscape
Phase
#
2
&
3
 








10,000,000
 66
Bridgeport CT Streets/Roads Pleasure
Beach
Bridge
Demoli3on
(removal
of
disabled
bridge
to
establish
direct
water
transporta3on)
and

Fishing
Pier
Construc3on
Project
(design‐phase
completed,
site
assembled,
project
planning
complete) 










4,500,000
 88
Bridgeport CT Streets/Roads Streetscape
Improvements
27A
Harbor
Yard
 










9,902,970
 100
Bridgeport CT Streets/Roads City
Wide
Bridge
Repair
 










5,000,000
 250
Bridgeport CT Streets/Roads Congress
Street
Bridge
Demoli3on
and
Re‐construc3on
Project
(design‐phase
completed,
project
planning

complete)
–
Es3mated
Cost:
$50
million 








50,000,000
 400
Bridgeport CT Streets/Roads Roadway
(Strategic
City‐wide
Paving
Project)
 






160,000,000
 600
Bridgeport CT Transit Fare
Box
Replacement
(replacing
65
fare
boxes
for
increase
in
regional
fare
coordina3on 










1,045,000
 4
Bridgeport CT Transit Transit
Authority
Bus
Emissions
Reduc3on
Project:

Re‐power
40
buses
to
solve
turbo
failure
problem
and

reduce
vehicle
emissions 










2,800,000
 20
Bridgeport CT Transit Transit
Authority
Shelter
Installa3on
Project:

Install
100
shelters
at
bus
stops
–
50
replace
exis3ng
shelters,
50

installed
at
stops
without
shelters











1,400,000
 20
Bridgeport CT Transit Transit
Garage
Expansion
Project 










2,500,000
 20
Bridgeport CT Transit Transit
Authority
Bus
Terminal
Project:

Provide
addi3onal
protec3on
from
the
elements
on
the
plazorms
of

the
new
bus
terminal 










3,900,000
 30
Bridgeport CT Transit Port
Authority
Ferry
Garage
Construc3on
Project
(Planned
phase
of
intermodal
transporta3on
center
project/

transit
oriented
development
/
design‐phase
completed,
site
assembled,
project
planning
complete)
–

Es3mated
Cost:
$4
million 










4,000,000
 80
Bridgeport CT Transit Transit
Authority
Maintenance
and
Administra3on
Facility
Project:
Expand
Administra3on
and
Maintenance

Facility
to
accommodate
growth,
improve
efficiency,
improve
working
condi3ons
and
develop
into
a

sustainable
facility
including
reducing
carbon
footprint 








14,000,000
 80
City State Program Project
Descrip3on Funding
Required Jobs
Bridgeport CT Water City‐wide
Sewer
Separa3on
Project
(Bridgeport
Water
Pollu3on
Control
Authority
WPCA)
Pump
Sta3on

Upgrades/
design‐phase
completed,
project
planning
complete,
ini3al
work
underway) 










5,000,000
 40
Bridgeport CT Water City‐wide
Sewer
Separa3on
Project
(Bridgeport
Water
Pollu3on
Control
Authority
WPCA)
/
design‐phase

completed,
project
planning
complete,
ini3al
work
underway)
 








12,000,000
 75
Bridgeport CT Water Bridgeport
Harbor
Maintenance
Dredging 








10,000,000
 80
Bridgeport CT Water Ox
Brook
Flood
Control
Project
(reconstruc3on
of
tributaries,
construc3on
of
new
channels,
installa3on
of
new

berm
at
Elton
Rogers
Park
&
new
pipe)
 








45,000,000
 400
Bridgeport CT Water City‐wide
Sewer
Separa3on
Project
(Bridgeport
Water
Pollu3on
Control
Authority
WPCA)
/
study‐phase

star3ng,

ini3al
tes3ng
underway) 








42,000,000
 600
Danbury CT CDBG Educa3on
&
Resource
Center
‐
Candlewood
Lake 












500,000
 20
Danbury CT CDBG Water
&
Sewer
Installa3ons
‐
Cornell
Road 










3,000,000
 20
Danbury CT CDBG Regional
Solid
Waste
Treatment
Sta3on
‐
Acquis3on
and
expansion
of
exis3ng
sta3on 








30,000,000
 50
Danbury CT CDBG Head
Start
of
Northern
Fairfield
County 








10,000,000
 100
Danbury CT Public
Safety Radio
Communica3ons
System
Upgrade 








10,000,000
 30
Danbury CT Schools Replace
Boiler
‐
Danbury
High
School 










1,500,000
 10
Danbury CT Schools Replace
Roof
‐
Park
Avenue
School 










1,000,000
 20
Danbury CT Schools Science
Labs
Renova3ons
‐
Danbury
High
Schools 










3,000,000
 70
Danbury CT Streets/Roads Bridge
Rehabilita3on
‐
East
Franklin
Street 










2,000,000
 20
Danbury CT Streets/Roads Bridge
Replacement
‐
Backus
Avenue 










1,000,000
 20
Danbury CT Streets/Roads Bridge
Replacement
‐
Crosby
Street 










1,400,000
 20
Danbury CT Streets/Roads East
Ditch
Deainage
Phase
II 










1,300,000
 20
Danbury CT Streets/Roads Re‐alignment
&
Beau3fica3on
‐
Plumtrees
Road 












445,000
 20
Danbury CT Streets/Roads White
Street
Streetscape
(Phase
II
&
III) 












500,000
 20
Danbury CT Streets/Roads Drainage
Improvements
‐
Citywide 










3,000,000
 30
Danbury CT Water West
Side
Interceptor
Sewer 








14,000,000
 40
Enfield CT CDBG Angelo
Lamagna
Ac3vity
Center
Pool
Replacement‐Replacement
of
35
year
old
outdoor
public
swimming
pool

located
in
community
revitaliza3on
area,
with
zero
depth
entry
pool. 










1,800,000

Enfield CT CDBG Higgins
School
Renova3ons‐Renova3on
of
former
school
building
to
house
child
development
center,
school

administra3ve
offices,
and
classroom
space
for
the
community
college 










7,000,000

Enfield CT CDBG North
Main
Street
Streetscape
Improvements‐Streetscape
improvements
to
support
the
Revitaliza3on
of

Thompsonville. 












250,000

Enfield CT CDBG Recrea3onal
Soccer
Fields
Expansion‐Construc3on
of
a
total
of
Six
(6)
Recrea3onal
Soccer
Fields




with
parking

facili3es
by
expanding
to
two
(2)
new
loca3ons 










1,400,000

Enfield CT CDBG Strand
Theater
Renova3on‐Renova3on
of
vacant
and
deteriorated
1937‐built
theater
in
revitaliza3on
area
for

community
performance
center. 










3,500,000

Enfield CT CDBG Village
Center
Exterior
Rehabilita3on‐Rehabilita3on
of
exterior
of
1890
building
Village
Center



located
in

community
revitaliza3on
area.
 












400,000

Enfield CT Energy Enrico
Fermi
High
School
Hea3ng
&
Cooling
Plant
Energy
Efficiency
Conversion‐Conversion
of
Hea3ng
&

Cooling
Plant
to
Energy
Efficient

System 










1,400,000

Enfield CT Energy WPC
Co‐Genera3on‐To
up
grade
the
Town’s
Water
Pollu3on
Control
Facility
to
begin
genera3ng
our
own

power
by
u3lizing
the
exis3ng
sludge 










9,500,000

Enfield CT Public
Safety Public
Safety
Communica3ons
System
Upgrade‐Replacement
of
Town‐wide
radio
system
with
trunked
system

and
computer
aided
dispatch. 










6,500,000

Enfield CT Schools Enfield
High
School
Fire
Line
Extension‐Extension
of
exterior
fire
line
to
replace
failed
line
under
building. 












350,000

Enfield CT Schools Secondary
Schools
Parking
Lot
Improvements‐Reconstruc3on
of
the
three
secondary
school
parking
lots,
with

improved
drainage
and
traffic
flow 










1,000,000

Enfield CT Streets/Roads Beverly
Street
Reconstruc3on.

Reconstruc3on
of
Beverly
Street
including
sidewalks
and
drainage 












250,000

Enfield CT Streets/Roads Freshwater
Blvd.
and
Cranbrook
Blvd.
Intersec3on
Improvements.

Installa3on
of
improved
signaliza3on
and

protected
leb
turn
lane
to
reduce
high
incidence
of
accidents. 












352,000

Enfield CT Streets/Roads Hazardville
Avenue
(State
Route
190)
Sidewalk
Extension.

Installa3on
of
2500
feet
of
sidewalk
connec3ng

shopping
areas
to
neighborhoods 












150,000

Enfield CT Streets/Roads Parker
Street
Storm
Drainage
Improvements‐Reconstruc3on
of
the
undersized
Parker
Street
drainage
ouzall 












100,000

Enfield CT Streets/Roads Powder
Hill
Road
Drainage
Improvements‐Installa3on
of
a
drainage
system
to
avert
roadway
flooding
and
icing.













200,000

Enfield CT Streets/Roads Road
2009
Street
Reconstruc3on.
Reconstruc3on
of
8
miles
of
local
streets
in
accordance
with
road

management
system
plan 








13,500,000

Enfield CT Streets/Roads Town
Farm
Road
Sidewalk‐Install
sidewalks
in
the
area
of
Town
Farm
Road
to
provide
safe
pedestrian
access
to

Town
Residence. 












450,000

Enfield CT Transit Transit
Center
Construc3on.

Redevelopment
of
former
site
of
train
sta3on
for
mul3‐modal
facilityalong
New

Haven
to
Springfield
communter
rail
line 








10,000,000

Enfield CT Water Inflow
&
Infiltra3on‐Elimina3ng
the
Inflow
&
Infiltra3on
of
the
sanitary
sewers
in
the
Thompsonville
sec3on
of

Town.

During
a
rain
event
the
effluent
treated
at
the
Water
Pollu3on
Control
Plant
increases
by
50%
 










1,100,000

Harzord CT CDBG Harzord
has
begun
a
$50
million
dollar
project
to
upgrade
our
70‐year‐old
flood
control
system.
Harzord

recently
completed
repairs
and
retained
our
Army
Corps
of
Engineers
cer3fica3on,
concluding
the
first
phase

of
this
project.
 








16,000,000
 250
Harzord CT CDBG The
dilapidated
Capewell
horse
nail
factory
is
a
key
lynch
pin
for
development
in
the
area
around
Colt
Park.
At

present
the
project
is
stalled
because
of
a
gap
in
funding
and
an
$8M
appropria3on
would
get
it
moving
again. 










8,000,000
 500
Harzord CT CDBG Harzord’s
new,
state
of
the
art
public
safety
complex
will
house
the
Police,
Fire,
and
Emergency
response

services
in
the
City.
It
will
protect
not
only
the
residents
of
Harzord,
but
will
also
serve
the
State
Capitol,
the

State
and
Federal
Courts 








21,000,000
 1000
Meriden CT CDBG Construct
job
seeker
computer
center
at
Meriden
Public
Library.

Public/community
facility
serving
low
mod

clients.

 














50,000
 3
Meriden CT CDBG Expand
downtown
WiFi
network.

Public
infrastructure
project
in
downtown/low
mod
income
area.

 














50,000
 4
Meriden CT CDBG Demolish
Blighted
Structures
at
84/88
Grove
Street.

Redevelop
area
as
public
parking.

Site
located
in
low
mod

area.

 












420,000
 5
Meriden CT CDBG Demolish
two
blighted
structures
on
Miller
Street.

Redevelop
site
with
City‐owned
parking
area
to
serve

Meriden
Public
Library
and
low
mod
clients.

 












500,000
 8
City State Program Project
Descrip3on Funding
Required Jobs
Meriden CT CDBG Replace
pool
at
Hubbard
Park.

Public/community
facility
serving
low
mod
clients.

 










1,200,000
 9
Meriden CT CDBG Demolish
Blighted
Structures
at
City‐owned
Factory
H
Brownfields
Site.

Redevelop
site
as
mixed
use
area
and

open
space.

Site
located
in
low
mod
area.
 










3,700,000
 65
Meriden CT CDBG Construct
needed
u3li3es
and
infrastructure
at
City‐owned
Meriden
HUB
brownfields
site.

Redevelop
site
as

mixed
use
area
and
open
space.

Site
located
in
low
mod
area.
 








10,000,000
 200
Meriden CT Energy Replace
windows,
hea3ng
and
HVAC
systems
at
City
Hall
for
energy
conserva3on. 










1,000,000
 4
Meriden CT Energy Construct
Compressed
Natural
Gas
(CNG)
vehicle
fueling
sta3on
for
use
by
the
City
fleet.

 












500,000
 5
Meriden CT Energy Install
backup
generator
for
use
by
Meriden
Public
Library,
Health
Department
and
Board
of
Educa3on.

 












900,000
 5
Meriden CT Energy Replace
windows
at
Augusta
Cur3s
Cultural
Center
for
energy
conserva3on. 












225,000
 5
Meriden CT Energy Replace
windows,
hea3ng
and
HVAC
systems
at
Meriden
Public
Library
for
energy
conserva3on.

 










1,000,000
 6
Meriden CT Energy Install
two
400
kWh
Fuel
Cells
for
electricity
genera3on
to
be
used
by
the
City's
Water
Pollu3on
Control
Plant

on
Evansville
Ave.

 










4,000,000
 8
Meriden CT Energy Replace
windows,
hea3ng
and
HVAC
systems
at
Meriden
Health
Dept./Stoddard
Building
for
energy

conserva3on. 










1,500,000
 10
Meriden CT Energy Replace
roof
and
install
solar
PV
array
for
building's
electricity
needs
at
Meriden
Parks
&
Recrea3on
building.

 












750,000
 12
Meriden CT Energy Replace
windows,
hea3ng
and
HVAC
systems
and
other
exterior
improvements
at
DPW
Facility
located
at

Michael
Drive
for
energy
conserva3on. 










3,000,000
 14
Meriden CT Public
Safety Install
emergency
electrical
generator
at
South
Meriden
Volunteer
Fire
Department. 














55,000
 3
Meriden CT Public
Safety Install
security
cameras
and
internet
communica3ons
at
Meriden
Health
Center
located
in
the
Stoddard

Building. 














70,000
 3
Meriden CT Public
Safety Purchase
two‐site
simulcast
and
dispatch
communica3ons
equipment
for
City's
Emergency
Opera3ons
Center

and
Police
Dispatch.

 










3,200,000
 3
Meriden CT Public
Safety Purchase
new
servers,
network
equipment,
electrical
and
data
cables
for
Police
Department
Data
Center.

 














60,000
 5
Meriden CT Public
Safety Install
high‐speed
Fiber
SONET
Ring
network
to
allow
for
networking
among
City
buildings.

 












600,000
 6
Meriden CT Public
Safety Construct
Impound/Evidence
Storage
Facility
at
City
transfer
facility
to
house
and
process
impound
evidence. 












800,000
 10
Meriden CT Public
Safety Renovate
Fire
Sta3ons
4,
5,
2
and
3
to
address
ongoing
maintence
problems,
environmental
issues,
code

issues,
and
outdated
hea3ng
systems.


Install
Access
Control
System
in
all
5
City
Fire
Sta3ons 










5,909,000
 20
Meriden CT Public
Safety Construct
addi3on
to
Police
Department
headquarters
to
accommodate
community
police
program. 










5,500,000
 30
Meriden CT Schools Replace
pools
at
City
High
Schools
to
meet
State
law.

Incoporate
renewable
energy
technologies
in
pool

reconstruc3on. 










5,500,000
 9
Meriden CT Schools Construct
building
addi3on
at
Hanover
Elementary
School
to
accommodate
all‐day
kindergarden. 










5,500,000
 40
Meriden CT Streets/Roads Install
new
signals
on
West
Main
and
Bradley,
and
on
Lewis
and
Springdate
to
mi3gate
traffic
conges3on
at

those
intersec3ons. 












300,000
 4
Meriden CT Streets/Roads Construct
City‐owned
parking
lot
at
Colony
and
Church.

Lot
will
serve
Central
Business
District.

 












200,000
 6
Meriden CT Streets/Roads Construct
new
retaining
wall
to
replace
deteriora3ng
wall
on
Prospect
Street. 












750,000
 6
Meriden CT Streets/Roads Locate
and
enter
in
all
water,
sewer
and
drainage
as‐built
infrastructure
into
City
GIS
database.
 












750,000
 6
Meriden CT Streets/Roads Repair/Construct
sidewalks
on
Broad
Street
from
I‐691
to
East
Main
Street. 












750,000
 6
Meriden CT Streets/Roads Repair/Construct
sidewalks
on
Oregon
Road
from
Wilcox
Technical
School
to
Quinnipiac
River
Watershed

Associa3on
Building.

 












750,000
 6
Meriden CT Streets/Roads Construct
drainage
system
behind
homes
off
Boylson
and
Maple
St. 












250,000
 8
Meriden CT Streets/Roads Complete
Olive
Street
Reconstruc3on
between
Elm
Street
and
Broad
Street. 












475,000
 10
Meriden CT Streets/Roads Construct
Hazmat
Storage
Building
at
DPW
complex. 












400,000
 10
Meriden CT Streets/Roads Improve
drainage
on
Cheshire/New
Cheshire
Roads
to
eliminate
icing
problem. 










1,000,000
 10
Meriden CT Streets/Roads Install
new
sidewalks
and
drainage
on
Cur3s
Street.
 










1,000,000
 10
Meriden CT Streets/Roads Complete
annual
sidewalk
contruc3on
and
repair
of
exis3ng
sidewalks. 












500,000
 12
Meriden CT Streets/Roads Reconstruct
southerly
por3on
of
Finch
Ave.
 










1,150,000
 12
Meriden CT Streets/Roads Replace
damaged
guiderails
citywide.

 












150,000
 12
Meriden CT Streets/Roads Complete
annual
street
paving
and
road
repairs.

 










2,000,000
 14
Meriden CT Streets/Roads Repair
sidewalks,
curbing
and
crosswalks
in
Central
Business
District.

Reinvest
in
prior
streetscape

expenditures
by
City. 










1,000,000
 15
Meriden CT Streets/Roads Reconstruct
5
miles
of
public
roads
in
City‐owned
Hubbard
Park.

 










2,000,000
 18
Meriden CT Water Construct
Hea3ng
Sytem
at
Broad
Brook
Treatment
Plant. 












400,000
 5
Meriden CT Water Design‐build
electrical
upgrades
to
Plaf
and
Lincoln
wells.

Project
consists
of
replacing
all
outdated
electrical

equipment
with
code‐compliant
equipment. 














90,000
 5
Meriden CT Water Complete
sewer
rehabilia3on
from
Griswold
Street
to
Center
Street.
Project
includes
relining
sanitary
sewers. 












100,000
 6
Meriden CT Water Remove
24"
sanitary
sewer
from
Hanover
Pond.

 












500,000
 6
Meriden CT Water Design‐build
sanitary
sewer
replacement
from
Oakland
Gardens
to
Griswold
Street.

Project
will
address
sewer

overflows
at
Jack
Barry
Field. 












500,000
 8
Meriden CT Water Upgrade
28‐
year
old
Silver
Lake
Pump
Sta3on.

Upgrades
include
all
mechanical
and
electrical
equipment.

 










1,000,000
 12
Meriden CT Water Clean
cement
lining
of
all
iron
water
mains
in
City
Water
Department
system.

Project
includes
replacement
of

all
valves
and
hydrants.

 










2,500,000
 20
Meriden CT Water Complete
sewer
rehabilia3on
in
sub‐basin
17.

Project
includes
relining
sanitary
sewers,
structural
spot
repairs,

and
rebuilding
manhole
covers
in
City
Water
Department
system.

 










2,500,000
 20
Meriden CT Water Design‐build
Broad
Brook
Pump
Sta3on
Upgrade
and
Rehabilia3on.

Project
consists
of
upgrading
pumps,

motors,
motor
control
panel,
pipine
and
other
structures. 










1,920,000
 20
Middletown CT CDBG Aqusi3on,
demoli3on
and
reloca3on
of
blighted
neighborhood.
Implementa3on
of
fully
approved

Redevelopment
Plan. 










3,500,000
 100
Middletown CT CDBG Northend
Homeownership
Project.
Completly
designed
and
approved.
Crea3on
of
17
units
of
affordable

housing
in
low
to
mod
census
tract. 










2,500,000
 100
Middletown CT CDBG Comple3on
of
8
soccer
fields,
to
include
2
24/7
lighted
turf
fields.
Land
acquired,
fully
approved
site
work

underway. 










4,000,000
 150
Middletown CT Energy Use
of
landfill
gas,
solar
panels
and
other
forms
of
alternate
energy
to
provide
heat
and
electricity
to
city

owned
184,000
sq.b.
brownfield
building
constructed
in
1894. 










5,000,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Middletown CT Streets/Roads Construc3on
of
city
parking
lot.
280
spaces
plans
complete,
bid
in
Feb.
09 












750,000
 40
Middletown CT Water Straighten
Country
Club
Road.
Designed
to
eliminate
2
very
bad
curves. 










6,000,000
 100
Middletown CT Water Mafabasset
Regionaliza3on.
Abandon
1970's
sewage
plant
on
CT
River
and
3e
into
modern
sewage
plant
2

miles
to
north. 








25,000,000
 300
Naugatuck CT CDBG Fawn
Meadow
Park
Irriga3on 












100,000
 2
Naugatuck CT CDBG Town
Wide
Park
Safety
Improvements 












150,000
 4
Naugatuck CT CDBG City
Hill
Field
Ligh3ng
Project 












200,000
 5
Naugatuck CT CDBG Renova3on
and
Irriga3on
and
Ligh3ng
Cross
Street
School 












250,000
 6
Naugatuck CT CDBG Construc3on
of
Gunntown
Park,
design
complete
all
approvals
in
place 












400,000
 11
Naugatuck CT CDBG Sanitary
Sewer
Rehabilita3on
 










1,600,000
 41
Naugatuck CT CDBG Brown
Field

Remedia3on
for
Renaissance
Downtown
Economic
Revitaliza3on
Project,
Project
currently
being

rebid
over
budget 












750,000
 51
Naugatuck CT CDBG Building
Renova3ons
To
Charles
Goodyear
Cultural
Center
(Building
25) 










1,665,000
 60
Naugatuck CT Streets/Roads Reconstruc3on
of
Historic
Town
Brick
Paver
Road,
Last
Brick
Road
in
Town,

Survey
complete
/30
%Design














800,000
 19
Naugatuck CT Streets/Roads Town
Wide
Paving
Program 












750,000
 24
Naugatuck CT Streets/Roads Rubber
Ave
Bridge
#03713 












300,000
 28
Naugatuck CT Streets/Roads Replacement
of
Town
wide
Sidewalks,
exis3ng
bid
in
place
 










1,500,000
 36
New
Haven CT CDBG Brewery
Square
Seawall
Reconstruc3on:

the
seawall
is
badly
deteriora3ng
and
needs
reconstruc3on.

The
park

walkway
is
washing
away.

Steel
Sheetpilings
must
be
patched
and
concrete
backing
must
be
poured 










1,000,000
 10
New
Haven CT CDBG Dover
Beach
Seawall:
Complete
repairs
to
the
sec3on
of
the
seawall
located
at
Dover
Beach
Park 












715,000
 10
New
Haven CT CDBG Eastshore
Park
Erosion
Control
Phase
II 












700,000
 10
New
Haven CT CDBG Bowen
Field:

Improvements
to
fields,
track,
bleachers,
restrooms
and
ADA
compliance 








15,000,000
 65
New
Haven CT CDBG River
Street
Industrial
Park.

1.
MDP
Phase
II:
Sidewalk/Street
improvements,
ligh3ng/signal
work.

2.

Brownfields:

Environmental
remedia3on
of
soils
and
factory
buildings.

3.

Waterfront:
Construct

bulkheads/walkway/park 










8,200,000
 125
New
Haven CT Energy Wind
Turbine
at
Sound
School:

A
750kW
wind
turbine
at
the
Sound
School
Voca3onal
Aquaculture
Center

would
fulfill
all
of
the
facility's
electrical
needs,
crea3ng
ongoing
savings
of
approximately
$300,000
per
year 










2,600,000
 20
New
Haven CT Energy Central
U3lity
Plant
and
Fuel
Cell:

U3lity
Plant
that
will
provide
mechanical
/
electrical
services
for
new
schools

‐
Hill
Central
and
Clemente
School
‐
inclusion
of
Fuel
Cell
for
minimizing
peak
demands 










6,500,000
 65
New
Haven CT Energy District‐wide
High
Performance
and
Sustainable
Energy
Efficiency
Improvements:

Improve
energy
efficiency

and
sustainability
for
various
school
buildings
with
low
e
glass
installa3on
and
high
performance
energy

management
system
upgrades
(including
upgra 








20,000,000
 225
New
Haven CT Schools District‐wide
code
compliance
and
accessibility
upgrades:

ADA
accessibility
upgrade
for
civil
rights
compliance

at
several
schools,
including
restrooms,
counters,
ramps,
elevators,
labs,
signage,
doors
and
swimming
pools. 










8,000,000
 85
New
Haven CT Schools Davis
Street
School:

Abate
and
demolish
the
exis3ng
Davis
Street
School
and
construct
a
new
pre‐K‐8
school
in

its
place.

New
school
building
would
use
highest
quality
energy
efficiency
measures 








48,000,000
 500
New
Haven CT Streets/Roads Downtown
/
Medical
District
Conges3on
Management
Program:

Replacement
of
12
traffic
signals
in
/
around

Yale
New
Haven
Hospital
and
the
Yale
Medical
District 










3,000,000

New
Haven CT Streets/Roads Major
Arterial
Rehabilita3on:

Mill
and
pave
Congress
Avenue
from
Davenport
Avenue
to
North
of
Ward
Street













440,000
 15
New
Haven CT Streets/Roads Crown
Street
Renova3on
Program:

Structural
repairs,
waterproofing,
electrical
work,
mechanical,
plumbing,

signage,
elevator,
etc.
associated
with
a
complete
state‐of‐good‐repair
reconstruc3on. 










5,700,000
 25
New
Haven CT Streets/Roads Prospect
Street
Bridge
Replacement:

Replace
bridge,
signaliza3on
and
approaches
‐
bridge
in
"poor"

condi3on. 










3,500,000
 25
New
Haven CT Streets/Roads Quinnipiac
Avenue
Phase
I:

Road
reconstruc3on
and
Traffic
Calming 










7,000,000
 70
New
Haven CT Streets/Roads State
Street
Bridge:
Replace
the
bridge
carrying
State
Street
over
the
Mill
River.

Bridge
is
in
"cri3cal"
condi3on

according
to
CT‐DOT
inspec3ons 










7,600,000
 76
New
Haven CT Water District‐wide
Paving
and
Drainage
Water
Conserva3on
Measures:

Drainage
and
erosion
control,
including
use

of
gray
water
for
irriga3on
systems,
water
deten3on
cisterns,
pervious
pavement
for
parking
areas
and

retaining
walls 










6,000,000
 65
Norwalk CT CDBG Installa3on
of
a
City
Hall
emergency
generator 












700,000
 6
Norwalk CT CDBG Pain3ng
and
repair
of
the
City
Hall
cupola 












150,000
 6
Norwalk CT CDBG City
Hall
roof
replacement
 










1,590,000
 15
Norwalk CT CDBG Construc3on
project:
renova3on
of
the
City
Hall
data
center.
This
project
will
completely
modernize



and
bring

up
to
building
and
safety
code
the
20+
year
old
data
center.
This
project
will
create
jobs
for
local
labor
–

electricians,
plumbers,
architects,
etc. 












700,000
 20
Norwalk CT CDBG Demoli3on
of
the
old
police
sta3on 










2,775,000
 20
Norwalk CT CDBG Renova3on
and
repair
of
the
Health
Department
building:
new
windows,
new
roof,
handicapped
access,

interior
light
fixtures. 










1,500,000
 20
Norwalk CT CDBG Structural
Repairs
SoNo
Railroad
Sta3on
garage
 










1,200,000
 27
Norwalk CT CDBG Norwalk
River
Valley
Trail
 










1,500,000
 30
Norwalk CT CDBG Structural
repairs
to
Yankee
Doodle
Garage
 










1,800,000
 40
Norwalk CT CDBG Fodor
Farm
Main
Farm
House:
Restora3on
of
an
18th
Century
Farm
House
as
centerpiece
of
a
sustainable

property
including
orchards
and
community
gardens,
educa3on
center. 












400,000
 50
Norwalk CT CDBG The
Lockwood
Mafhews
Mansion
Museum
needs
new
mechanical
and
electrical
systems,
an
HVAC
system

upgrade,
ligh3ng
and
fire
safety
systems,
and
an
elevator.
Thermal
wells
and
a
poten3al
solar
hea3ng
system

are
being
considered
to
support
energy
needs. 










2,500,000
 80
Norwalk CT CDBG Calf
Pasture
Beach:
crea3ng
a
Visitors
Center
and
gateway
to
Norwalk’s
islands
and
waterfront.

Adap3ve
Re‐
use
of
exis3ng
structure. 










3,500,000
 200
Norwalk CT CDBG Oyster
Shell
Park:
A
former
landfill
turned
into
a
Riverfront
Park
offering
the
latest
green
technology.

Key

walkways
connec3ng
area
afrac3ons.
Phase
II
and
III, 










3,000,000
 200
Norwalk CT Housing Washington
Village
energy
efficient
hea3ng
plant
and
site
infrastructure
improvements.
Keeps
136
families

effec3vely
housed
in
affordable
units.

 










1,250,000
 20
Norwalk CT Housing Roodner
Court
windows
and
weatheriza3on
‐
Keeps
218
families
effec3vely
housed
in
affordable
units.










 










1,570,000
 22
City State Program Project
Descrip3on Funding
Required Jobs
Norwalk CT Housing 
Colonial
Village
Energy
Conserva3on
and
Family
Resource
Center
–
Includes

energy

efficient
windows
and

storm
doors.
Family
Resource
Center
will



combine
aberschool
program,
childcare,
arts
and
family
self‐
sufficiency
programs.












 








10,400,000
 68
Norwalk CT Schools Repair
and
modernize
10
schools,
including
such
ac3vi3es
as
replacing
exterior
windows,
emergency
ligh3ng,

exterior
doors
and
frames,
boilers
and
burners,
roofs,
PA
systems,
fire
alarm
systems,
emergency
ligh3ng,

installing
new
DDC,
ABS/EMS 










7,808,651
 166
Norwalk CT Streets/Roads Westmere
Bridge
replacement

 












200,000
 5
Norwalk CT Streets/Roads Removal
of
Old
Tokeneke
Bridge

 












400,000
 10
Norwalk CT Streets/Roads Route
1
Widening
project
 












450,000
 10
Norwalk CT Streets/Roads Perry
Avenue
Bridge
replacement

 












700,000
 16
Norwalk CT Streets/Roads Replacement
of
six
traffic
signals:
Belden
Ave
@
Cross
St;
Belden
Ave
@
Rte
7;
Van
Zant
St
@
Fire
House;
Van

Zant
St
@
Osborne;
Fox
Run
and
Ward
St
@
Freese
Court 










1,500,000
 25
Norwalk CT Streets/Roads Cedar
Street
Improvements
 










1,500,000
 35
Norwalk CT Streets/Roads Fairfield
Avenue
Reconstruc3on 










7,000,000
 75
Norwalk CT Streets/Roads Strawberry
Hill
Traffic
Calming
 










7,000,000
 75
Norwalk CT Streets/Roads Renova3on
of
the
urban
core
(approx.
30
acre
site)
infrastructure
to
include
pedestrian‐friendly
sidewalks,

ligh3ng,
roadway
construc3on
&
u3lty
reloca3on 








43,000,000
 200
Norwalk CT Streets/Roads 65
centerline
miles
of
roadway
paving 








25,000,000
 220
Norwalk CT Water Mary
Aus3n
at
Silvermine
Avenue
Drainage
Installa3on
[ready] 












350,000
 15
Norwalk CT Water Olmstead
Place,
Noah’s
Lane,
Meadowbrook
Drainage
improvement
package
(bids
received,
contractor

selected) 










1,000,000
 25
Norwalk CT Water Buckingham‐Lockwood
Drainage
Improvement
Project 










4,000,000
 100
Norwalk CT Water Keeler
Brook
Drainage
Improvement
Project
[in
design] 










9,000,000
 200
Norwalk CT Water Wastewater
Treatment
Plant
Upgrade,
Phase
I 








45,000,000
 500
Norwich CT CDBG Brownfield
Waterfront
Cleanup
for
26
Shipping
Street.

The
City‐owned
brownfield
is
in
a
waterfront
area
with
 












500,000
 19
Norwich CT CDBG Dog
Pound.

Approved
project
to
break
ground
in
March. 












800,000
 25
Norwich CT CDBG Norwich
Harbor
Sea
Wall
Project.

This
project
is
under
construc3on,
however
there
are
plans
ready
to
go
to

convert
from
sheet
steel
pilings
to
prefabricated
concrete
block
for
final
phase
at
Harbor
on
Thames
River.
This

change
was
unforeseen
and
was
req 












500,000
 40
Norwich CT CDBG Norwich
Hospital
Site
Remedia3on.
Environmental
remedia3on
of
60
acre
Norwich
State
Hospital
site
in
the

southeastern
sec3on
of
the
City
(Laurel
Hill
sec3on)
for
future
development
on
site
to
create
jobs,
(both

construc3on
and
new
enterprise
outlets) 










3,000,000
 350
Norwich CT Streets/Roads City
of
Norwich
Road
Construc3on
project
plans
and
specifica3ons
are
complete
for
15
miles
of
qualifying

federal
aid
streets.

Work
includes
both
milling
and
paving
of
exis3ng
roads.
Contract
award
and
construc3on

can
take
place
within
60
days
of
fund 










5,500,000
 15
Norwich CT Streets/Roads City
of
Norwich
Sidewalk
Construc3on
project
includes
4
miles
of
sidewalks
along
several
State
Highways

where
no
sidewalk
exists.
Since
the
opening
of
the
casinos
in
adjacent
communi3es,
pedestrian
traffic
has

increased
drama3cally,
primarily
by
casino 










1,500,000
 15
Norwich CT Water Norwich
Public
U3li3es
Wastewater
Facili3es
Upgrade
project.

The
first
phase,
installa3on
of
equipment
that

will
improve
the
ability
of
the
plant
to
process
waste
and
allow
the
plant
to
become
basically
energy

independent
is
an
es3mated
$8
Million
e 










8,000,000
 30
Stamford CT CDBG Old
Town
Hall
Boiler
Replacement 












250,000
 3
Stamford CT CDBG Veteran's
Park
Ligh3ng 












100,000
 3
Stamford CT CDBG Rosa
Hartman
Park
Renova3on 












225,000
 6
Stamford CT CDBG Hatch
Park
Renova3on 










1,100,000
 10
Stamford CT CDBG Cummings
Park
Pier
&
Pavilion 












700,000
 12
Stamford CT CDBG Kosciuszko
Park
Plan3ng 












500,000
 12
Stamford CT CDBG Rogers
School
Renova3on 










5,000,000
 40
Stamford CT CDBG Scalzi
Park
Upgrade 










5,000,000
 45
Stamford CT CDBG Mill
River
Park
Beferments,
I‐95
to
Main
St. 








20,000,000
 100
Stamford CT CDBG Mill
River
Park
Beferments,
South
of
I‐95 








35,000,000
 100
Stamford CT Energy Fuel
Cell
Absorbsion
Chiller 










4,000,000
 8
Stamford CT Energy Citywide
Street
Ligh3ng
Infrastructure
Upgrade 










4,680,000
 11
Stamford CT Energy Dolan
Middle
School
Windows
and
Doors 










2,000,000
 20
Stamford CT Energy Historical
Society
Windows
and
HVAC 










2,000,000
 20
Stamford CT Energy Turn
of
River
Windows 










1,500,000
 20
Stamford CT Energy Waste
To
Energy
Biomass
Gassificasion
Energy
Produc3on 








50,000,000
 75
Stamford CT Housing Roof
Replacement
at
Stamford
Manor. 












375,000
 25
Stamford CT Housing Brick
and
concrete
repair
and
replacement
at
Stamford
Manor. 












300,000
 35
Stamford CT Housing Security
Improvements
at
Stamford
Manor. 












500,000
 40
Stamford CT Housing Quintard
Manor
Rehabilita3on 










4,500,000
 70
Stamford CT Housing Clinton
Manor
Rehabilita3on 










8,150,000
 90
Stamford CT Housing Progress
Drive
Apartments 








13,700,000
 230
Stamford CT Public
Safety Provide
training
for
foreign
languages
classes
for
Police
Officers 














48,000
 1
Stamford CT Public
Safety Purchase
plate
reading
vehicles
to
assist
in
Homeland
Security
programs 












104,000
 1
Stamford CT Public
Safety Emergency
response
team
for
Homeland
Security
(Training
and
start
up) 












124,000
 2
Stamford CT Public
Safety Street
mentoring
for
street
violence/work
with
youth
groups/gangs 












200,000
 4
Stamford CT Public
Safety Purchase
Biological/chemical
tes3ng
equipment
to
improve
forensic
capabili3es 












450,000
 6
Stamford CT Public
Safety Train
7
K‐9's 












164,000
 7
Stamford CT Public
Safety DNA
capable
Forensic
Unit 












850,000
 8
Stamford CT Public
Safety Combine
a
Task
Force
approach
for
Juvenile
Jus3ce
w/Child
Guidance,
proba3on,
social
agencies 












600,000
 10
Stamford CT Public
Safety Safe
street/
Neighborhood
Task
Force
walking
patrols 










1,280,000
 16
Stamford CT Public
Safety Police
Cadet
(Trainee
program) 














80,000
 20
Stamford CT Schools District
Wide
Electrical 








15,000,000
 15
Stamford CT Schools District
Wide
Technology
Infrastructure 








10,000,000
 15
Stamford CT Schools Energy
Conserva3on
Projects 








15,000,000
 15
Stamford CT Schools Davenport
Code/Renova3on 










8,600,000
 20
Stamford CT Schools District
Wide
Boiler
Projects 








10,000,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Stamford CT Schools Cloonan
Renova3ons 








14,000,000
 25
Stamford CT Schools District
Wide
Paving 








10,000,000
 25
Stamford CT Schools Rippowam
Center
Code/Renova3ons 










8,500,000
 25
Stamford CT Schools Westhill
High
School
Mechanical
Upgrade 








15,000,000
 25
Stamford CT Schools Boyle
Stadium
Renova3on 










3,500,000
 30
Stamford CT Schools Northeast
Code/Renova3on 








12,500,000
 40
Stamford CT Schools Modular
Classroom
Replacement 








20,000,000
 50
Stamford CT Schools System
Wide
Roofing 








15,000,000
 50
Stamford CT Schools District
Wide
Turf
Field 








15,000,000
 100
Stamford CT Schools South
End
Charter
School 








15,000,000
 100
Stamford CT Schools Springdale
Expansion/Renova3ons 








15,000,000
 100
Stamford CT Schools System
Wide
Code
Compliance
Projects 








20,000,000
 100
Stamford CT Schools System
Wide
IAQ
Projects 








50,000,000
 100
Stamford CT Schools Stamford
High
School 








31,000,000
 150
Stamford CT Streets/Roads Long
Ridge
Road
intersec3on
improvements 












300,000
 3
Stamford CT Streets/Roads School
zone
flashers
implementa3on 












200,000
 3
Stamford CT Streets/Roads Bridge
recondi3oning/railing
replacements 












155,000
 4
Stamford CT Streets/Roads Citywide
op3cal
fire
pre‐emp3on
installa3on 












750,000
 4
Stamford CT Streets/Roads Corn
Cake
Lane
roadway
improvement 














85,000
 4
Stamford CT Streets/Roads Emergency
back
up
power
for
traffic
signals 












250,000
 4
Stamford CT Streets/Roads Laurel
Road
roadway
improvement 












100,000
 4
Stamford CT Streets/Roads Skymeadow
Drive
roadway
improvement 












250,000
 6
Stamford CT Streets/Roads Spring
Street
reconstruc3on 












250,000
 6
Stamford CT Streets/Roads Cold
Spring
Rd.
Bridge
Rehab 










2,000,000
 7
Stamford CT Streets/Roads Atlan3c
Street
streetscape
sidewalk
replacement 










1,000,000
 8
Stamford CT Streets/Roads Guard
rails
improvements 












127,000
 8
Stamford CT Streets/Roads Hope
Street
paving 










1,000,000
 8
Stamford CT Streets/Roads Bedford
Street
streetscape
sidewalk
replacement 










2,000,000
 10
Stamford CT Streets/Roads Citywide
paving 










3,500,000
 12
Stamford CT Streets/Roads Oaklawn
Avenue
roadway
reconstruc3on 










3,000,000
 15
Stamford CT Streets/Roads Turn
of
River
Road
Roadway
reconstruc3on 










8,000,000
 15
Stamford CT Streets/Roads Richmond
Hill
Avenue
bridge
replacement 










4,000,000
 20
Stamford CT Streets/Roads Implementa3on
of
traffic
calming
plan 










3,000,000
 60
Stamford CT Streets/Roads Greenwich
Ave.
Improvements 










6,000,000
 100
Stamford CT Transit Security
Cameras
at
Municipal
Parking
Garages 












330,000
 4
Stamford CT Transit Commuter
rail
parking
improvements 










3,000,000
 10
Stamford CT Transit Stamford
Urban
Transitway
Phase
1 








10,000,000
 20
Stamford CT Transit Signal
hardware
upgrade
citywide 








25,000,000
 60
Stamford CT Transit Stamford
Urban
Transitway
‐
Phase
2 








54,000,000
 100
Stamford CT Water Intervale
Sewers 










5,500,000
 30
Stamford CT Water Carriage
Drive
Sewers 










6,000,000
 60
Stamford CT Water Perna
Lane
Sewers 










5,000,000
 60
Stamford CT Water Wedgemere
Road
Sewers 










4,000,000
 60
Strazord CT CDBG Perry
House
Historic
Preserva3on
Project:
Improvements
and
addi3ons
to
one
of
the
oldest
homesteads
in
the

United
States;
part
of
larger
community
and
road
improvement
project
to
this
area
coming
off
from
Interstate

95. 












350,000
 20
Strazord CT CDBG Town
Residen3al
Rehabilita3on
Program
(RRP):
Recapitaliza3on
of
program
to
fund
backlog
of
applicants
for

home
improvement/code
compliance
work
in
low‐mod
income
areas
of
Strazord.
 












150,000
 20
Strazord CT CDBG Birdseye
&
Strazord
Academy
Field
Improvements
to
athle3c
fields
for
two
recrea3on
sites.

Work
includes

new
community
sports
facili3es,
an
1,800
foot
walking
track
and
addi3onal
parking
spaces.
 










1,200,000
 25
Strazord CT CDBG Boothe
Memorial
Park
Improvements
and
Restora3ons:
Various
historical
restora3on/preserva3on
projects
in
town
park. 










1,000,000
 30
Strazord CT CDBG Greenway
Project‐
Railroad
to
Short
Beach
Crea3on
of
publically‐accessible
greenway
from
Strazord
Center/Rail
Sta3on
to
Short
Beach.

Path
to
be

located
on
Town
property
and
exis3ng
rights‐of‐way. 










2,400,000
 30
Strazord CT CDBG Short
Beach
Park
Improvements:
Improvement
projects
to
facili3es
at
Short
Beach
Park,
including
sand

restora3on,
replacement
and
upgrading
of
bleachers,
sports
field
restora3on,
parking
lot
resurfacing,
code‐
related
playground
renova3ons. 










1,300,000
 30
Strazord CT CDBG Sidewalk
Replacement
Projects:
Combina3on
of
low
&
moderate‐income
neighborhoods
targeted
for
new
sidewalk
installa3on
and
sidewalk

replacements.

 










1,000,000
 30
Strazord CT CDBG Municipal
Building
Capital
Upgrades:
including
roof
repair
and
replacement,
Police
Department
building

improvements,
Town
Hall
ADA
compliance
work. 












500,000
 35
Strazord CT CDBG Renova3ons
to
New
Site
for
Emergency
Medical
Services
(EMS):Project
is
100%
design
and
permit‐ready;
will

renovate
old
Strazord
Fire
Sta3on
house
to
accommodate
Town’s
EMS
fleet
and
offices.

Project
will
include

energy
efficiency
components. 










2,150,000
 45
Strazord CT CDBG Long
Beach
West
Cofage
Demoli3on
and
Improvements:
Removal
of
45
cofages
on
coastal
property;
includes
demoli3on,
hazardous
waste
remedia3on,
restora3on
of

natural
habitat,
&
access
improvement. 










5,000,000
 500
Strazord CT Energy Municipal
Building
Generator
Replacements:
Replacement/retrofiqng
of
old
and
energy‐inefficient
generators
at
Police
Sta3on,
Strazord
Town
Hall
and

Bunnell
High
School.

 












600,000
 12
Strazord CT Housing Strazord
Housing
Authority‐Public
Housing
Roofing
Projects:
Total
of
thirteen
(13)
new
roofs
at
Shiloh
Gardens

and
Lucas
Gardens
public
housing
developments.

 












150,000
 30
Strazord CT Schools School
Capital
Improvement
Projects
at
15
school
buildings
throughout
the
system.

Includes
window
and

panel
replacement
to
improve
building
energy
efficiency,
roof
and
masonry
repair,
ADA
code
compliance. 










3,491,000
 70
Strazord CT Streets/Roads Barnum
Avenue
Streetscape
Project:
Project
encompasses
work
on
both
sides
of
approximately
1,500
linear

feet
of
Barnum
Ave
(US
Rte
1).
Includes
construc3on
of
street/traffic
improvements,
storm
water
drainage

collec3on
system
upgrades,
landscaping.

 










2,000,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Strazord CT Streets/Roads Project
First
Impression‐West
Broad
Street/I95
Interchange
32
ramps
Streetscape,
curb
reconstruc3on,
pedestrian
enhancements
and
road
resurfacing
work
to
improve
entry
into

Historic
Strazord
Center
from
I95
at
Exit
32.

 










1,500,000
 35
Strazord CT Water WPCA
Stormwater/Sanita3on
Projects
Crew
Create
a
new
four‐person
crew
dedicated
solely
to
the
backlog
of
bonded
storm
water
projects
that
will
help

the
Town
in
mee3ng
new
requirements
for
storm
water
management
permit
for
the
CT
DEP.

 












600,000
 4
Strazord CT Water King
Street
Culvert:
Project
would
alleviate
chronic
flooding
problems
in
heavy
commercial
area
of
town.

Two

loca3ons
along
King
Street
in
would
be
the
subject
of
the
project‐
West
Broad
Street
and
Main
St
(Rte113).

 










3,000,000
 35
Waterbury CT CDBG Cherry
Street
Industrial
Park
remedia3on
to
add
to
industrial
site
inventory
in
an3cipa3on
of
immediate

business
expansion. 












600,000
 15
Waterbury CT CDBG Mafatuck
Manufacturing
environmental
remedia3on
to
prepare
8‐acre
site
for
immediate
development. 












500,000
 35
Waterbury CT CDBG State‐of‐the‐art
environmental
technology
are
planned
for
a
30,000‐square
foot
expansion
of
the
Silas
Bronson

Library. 








19,000,000
 75
Waterbury CT CDBG The
renova3on
of
historic
City
Hall
will
modernize
city
business
prac3ces
and
jump
start
downtown

development. 








25,000,000
 300
Waterbury CT CDBG Waterbury
Industrial
Commons
remedica3on
and
construc3on
project
to
develop
a
consolidated
Public
Works

campus
and
add
to
industrial
pad
site
inventory. 








10,000,000
 300
Waterbury CT Schools Construc3on
of
two
K‐8
elementary
schools
in
CDBG
eligible
census
tracts
as
part
of
a
wider
neighborhood

revitaliza3on 








70,000,000
 200
Waterbury CT Transit Mul3‐Modal
Transporta3on
Center
on
Meadow
Street
to
provide
enhanced
bus,
tax
and
train
transporta3on

for
the
region. 








28,000,000
 150
West
Harzord CT CDBG Community
Center
Improvements 










1,000,000
 40
West
Harzord CT CDBG Sewer
improvements 












800,000
 40
West
Harzord CT CDBG Sidewalk
replacement 












500,000
 40
West
Harzord CT CDBG Economic
development
streetscape 










1,000,000
 50
West
Harzord CT CDBG Handicap
accessibility 










1,000,000
 50
West
Harzord CT CDBG Housing
Rehab. 












500,000
 50
West
Harzord CT CDBG Street
reconstruc3on 










2,000,000
 50
West
Harzord CT Energy Vehicle
replacement 












400,000
 10
West
Harzord CT Energy Boiler
Replacement
schools 










2,750,000
 50
West
Harzord CT Energy School
window
replacemnt 










1,700,000
 50
West
Harzord CT Energy Fuel
Cell
installa3on
rink/pool 










3,000,000
 90
West
Harzord CT Energy Street
light
led
upgrade 










4,500,000
 100
West
Harzord CT Housing Expansion
of
senior
housing
complex 








20,000,000
 300
West
Harzord CT Public
Safety Addi3onal
personel 










1,000,000
 10
West
Harzord CT Public
Safety public
safety
equipment 










2,500,000
 50
West
Harzord CT Public
Safety fire
sta3on
replacement 








10,500,000
 200
West
Harzord CT Schools school
fire
safety
improvements 










2,200,000
 75
West
Harzord CT Schools School
ven3la3on
improvements 










2,400,000
 80
West
Harzord CT Schools school
fiber
op3c
improvements 










3,500,000
 85
West
Harzord CT Streets/Roads Arterial
Street
Reconstruc3on 










3,000,000
 40
West
Harzord CT Streets/Roads Street
pedestrian
safety
improvements 










2,500,000
 50
West
Haven CT CDBG Public
beach
restora3on
project 












800,000
 10
West
Haven CT CDBG Streetscaping
‐
Route
1
Boston
Post
Road;
Campbell
Avenue;
Main
Street 










3,000,000
 25
West
Haven CT Public
Safety Addi3onal
School
Resource
Officers
assigned
to
public
schools.
The
Schoool
Resource
Officer
Program
has
been

very
successful
in
the
upper
grades
and
would
be
successful
if
we
implement
a
SRO
assigned
exclusively
to
the

lower
grades
for
con3nuity 














75,000
 1
West
Haven CT Public
Safety Implement
"hot
spot"
monitoring
of
high
crime
area
throughout
our
City
through
the
use
of
video
monitoring.

This
will
allow
us
to
befer
allocate
resources
and
have
real‐3me
informa3on
on
suspected
criminal
ac3vity. 














55,000
 1
West
Haven CT Public
Safety Provide
addi3onal
crime
preven3on
and
quality
of
life
officers.
These
proac3ve
programs
were
either

substan3ally
curtailed
or
eliminated
due
to
the
lack
of
Federal
funding
the
past
several
years.
 












150,000
 2
West
Haven CT Public
Safety Enhance
police/fire
radio
system
to
fully
fuc3onalize
geographical
area
coverage
and
provide
enhanced

interoperabiity
between
Police
&
Fire
and
between
Regional
inter‐departmental

response
teams. 












215,000
 4
West
Haven CT Public
Safety Establish
gang/gun
task
force
to
focus
on
these
serious
issues
facing
our
neighborhoods.
Since
these
monies

(programs)
were
eliminated
some
years
ago,
we
have
seen
a
steady
decline
in
the
quality
of
life
in
our

neighborhoods. 












300,000
 4
West
Haven CT Public
Safety 1.
Addi3onal
School
Resource
Officers
assigned
to
public
schools.
2.
Establish
gang/gun
task
force
to
focus
on
these
issues
facing
our
neighborhoods. 












625,000
 5
West
Haven CT Streets/Roads Replacement
of
three
culverts 










3,500,000
 20
West
Haven CT Water Water
Pollu3on
Control
Plant
Upgrade 








62,000,000
 50
Washington DC Streets/Roads 11th
Street
Bridge
Ramp
Demoli3on 










8,000,000

Washington DC Streets/Roads 14th
Street
Bridge
Rehabilita3on 








14,100,000

Washington DC Streets/Roads 16th
Street
NW
over
Military
Road
Rehabilita3on 










5,000,000

Washington DC Streets/Roads 31st
Bridge
NW
over
C&O
Canal 










5,000,000

Washington DC Streets/Roads Columbia
Heights
Improvements 










8,000,000

Washington DC Streets/Roads New
York
Avenue
Bridge 








40,000,000

Washington DC Streets/Roads New
York
Avenue/Florida
Avenue
Intersec3on 










8,000,000

Washington DC Streets/Roads South
Dakota‐Riggs
Road
Upgrade 










3,600,000

Wilmington DE CDBG Sidewalk
Repairs 












500,000
 4
Wilmington DE CDBG Street
Paving 










2,000,000
 10
Wilmington DE Energy Energy
Conserva3on
Measures
in
City
buildings 










1,000,000
 2
Wilmington DE Energy Trafic
and
Street
Light
Retrofits 










1,500,000
 3
Wilmington DE Energy Energy
Conserva3on
Measures
in
Water/Wastewater
Facili3es 










5,000,000
 12
Wilmington DE Energy Solar
Photovoltaic
Installa3ons 








12,000,000
 20
Wilmington DE Water Water
Distribu3on
Main
Replacement
(30
miles) 








30,000,000
 33
Boynton
Beach FL CDBG Hester
and
Pence
Parks
Ligh3ng/Field
Retrofit
‐
Conversion
of
exis3ng
natural
turf
ball
fields
to
synthe3c
turf

and
conversion
of
ball
field
ligh3ng
to
computer
controlled
ligh3ng
for
energy
conserva3on,
thereby

elimina3ng
the
use
of
chemicals 










1,600,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Boynton
Beach FL CDBG Municipal
Grounds
Landscape
Retrofit
‐
Upgrade
landscaping
to
replace
large
turf
areas
with
na3ve
plan3ngs

to
reduce
reliance
on
potable
water
supplies.

Project
would
also
result
in
the
reduc3on
of
fer3lizer/chemical

applica3ons 










1,000,000
 15
Boynton
Beach FL CDBG Oceanfront
Park
Boardwalk
Replacement
‐
U3lizing
a
renewable
wood
source
this
project
calls
for
the

replacement
of
approximately
900
linear
feet
of
oceanfront
boardwalk.

The
exis3ng
boardwalk
has
failed
and

is
presen3ng
a
hazard
to
beach
patrons.
 










2,400,000
 50
Boynton
Beach FL CDBG Quantum
Eco
Park
‐
Development
of
an
"eco"
park
using
LEEDS
or
other
"green"
design
principals.

Ameni3es

to
include
trails
through
natural
areas,
nature
center
for
environmental
educa3on,
interpre3ve
exhibits,
rock

garden,
buferfly
garden,
botanical
garden
 










4,500,000
 50
Boynton
Beach FL CDBG Seacrest
&
MLK,
Jr.
Blvd.
Recconstruc3on
‐
improve
sec3ons
of
low‐income
minority
community
to
increase

safety,
encourage
redevelopment
and
improve
quality
of
life.

Includes
new
ligh3ng,
crosswalks,
wider

sidewalks,
landscaping,
pavers
and
traffic
circle 










5,500,000
 60
Boynton
Beach FL CDBG Boynton
Harbor
Public
Marina
‐

Redesign
to
improve
boat
slips,
construct
public
walkways,
ligh3ng,
signage,

landscaping
and
public
art.

Design
elements
conserve
water
and
electricity.
Catalyst
project
for
county
water

transit
system. 










6,500,000
 75
Boynton
Beach FL CDBG Congress
Ave.
Community
Park
‐
Construc3on
of
a
13
acre
barrier‐free
community
park
including
a
4,000
to

8,000
sq.b.
therapeu3c
recrea3on
building
built
to
LEEDS
or
Florida
Green
Building
Coali3on
Standards.
 










8,900,000
 100
Boynton
Beach FL CDBG New
Police
Facility
‐
The
Na3onally
accredited
Boynton
Beach
Police
Department
currently
opera3ng
in
an

18,000
sq.
b.
building.

Recent
space
analysis
found
the
need
for
81,000
sq.
b.

Experiencing
increased
public

demand
for
police
services.

 








31,000,000
 300
Boynton
Beach FL Water Perimeter
Protec3on
and
Surveillance
Entry
No3fica3on
‐
Security
improvements
for
water
treatment
and

other
u3li3es
facili3es 












227,670
 3
Boynton
Beach FL Water Stormwater
Improvement
and
Water
Main
Replacement‐NW
17th
Ave.
‐
Potable
water
main
installa3on
and

stormwater
improvements 










3,234,000
 43
Boynton
Beach FL Water Stormwater
Improvement
‐
SE
4th
Street/SE
Federal
Hwy
Corridor
‐
Roadway
improvements,
potable
water

main
installa3on,
stormwater
and
reclaimed
water
improvements 










5,020,792
 67
Boynton
Beach FL Water Phase
I
New
Force
Main
from
East
Plant
Site
to
Regional
Plant,
new
force
main
LS
at
SE
6th
Ave.,
new
LS
at
SE

6th
Ave.
‐
New
regional
sewage
force
main
and
pumping
sta3on
to
provide
future
capacity
and
redundancy
of

cri3cal
infrastructure 










6,320,000
 84
Boynton
Beach FL Water Stormwater
Management/Swale
Improvements
at
Seacrest
Corridor‐Potable
water
main
replacement
and

stormwater
improvements 










7,529,597
 100
Cape
Coral FL CDBG Construct
perimeter
walls
around
new
reverse
osmosis
and
water
reclama3on
facili3es 










2,800,000
 20
Cape
Coral FL CDBG Sidewalks
and
curbing
program‐
retrofit
4
lane
divided
roadways 








10,000,000
 36
Cape
Coral FL CDBG Chiquita
Boatlock‐construct
boat
lock
to
facilitate
state
requirements
for
clean
waterway
on
the
south
spreader

waterway 








13,000,000
 100
Cape
Coral FL CDBG U3lity
Expansion
Program,
Provide
public
water,
sewer
and
wastewater
recycle
to
replace
well
and
sep3c‐Sw

6/7area,
Noth
1
through
8
areas
and
facility
expamsion
project 






345,400,000
 1359
Cape
Coral FL Energy ASR
Treatment
System‐Treatment
for
alterna3ve
storage
and
recovery
wells 










7,500,000
 20
Cape
Coral FL Energy Everest
Odor
Control‐upgrade
of
odor
control
system
at
the
water
reclama3on
facility 










2,600,000
 20
Cape
Coral FL Energy environmental
building
construc3on 










9,200,000
 80
Cape
Coral FL Public
Safety North
Cape
Guard
House‐
install
guard
house
for
homeland
security
feature
at
Reverse
Osmosis
water
plant 












800,000
 20
Cape
Coral FL Streets/Roads Citywide
roadway
maintenance‐resurfacing
of
deteriora3ng
road
surfaces 








10,000,000
 36
Cape
Coral FL Streets/Roads Chiquita
Boulevard
Widening‐widen
roadway
from
4
to
6
lanes 








60,000,000
 436
Clearwater FL CDBG Fort
Harrison
Avenue/Pinellas
Street
Intersec3on
Improvements 










1,800,000

Clearwater FL CDBG Keene
Road/Druid
Road
mast
arm 












250,000

Clearwater FL CDBG Municipal
Services
Building
Parking
Lot 












250,000

Clearwater FL Water Air
Release
Valve
Reloca3ons 












150,000

Clearwater FL Water Lake
Bellevue
Stormwater
Expansion 










2,600,000

Clearwater FL Water Marshall
Street
&
Northeast
Treatment
Plants
Centrifuge
Dewatering 










2,800,000

Clearwater FL Water Marshall
Street
and
East
Treatment
Plants
Hypochlorite
Conversion 










1,300,000

Clearwater FL Water Marshall
Street
Treatment
Plant
Generator
Modifica3ons 










1,600,000

Clearwater FL Water Northeast
Treatment
Plant
Secondary
Digester
Improvements 










2,200,000

Clearwater FL Water Overlea
&
Stevenson
Drives
Sanitary
Improvements 












600,000

Clearwater FL Water Pump
Sta3on
65
Force
Main
Reroute 












820,000

Cocoa
Beach FL CDBG Equipment
Storage
building
‐
solar
powered/LEED

cer3fied
Intended
to
extend
vehicle
life
by
corrosion
reduc3on 














50,000
 5
Cocoa
Beach FL CDBG Vehicle
storage
building
‐

solar
powered/LEED

cer3fied
Intended
to
extend
vehicle
life
by
corrosion
reduc3on 












150,000
 10
Cocoa
Beach FL CDBG Administra3on
facility
solar
powered/LEED

cer3fied
energy‐efficient
ligh3ng
(property
acquired/needs
assessment
study
done)
)(must
receive
funding
early
2009
to
complete
by
end
of
2010) 










8,000,000
 50
Cocoa
Beach FL Energy Install
solar
power
grid.

Provide
power
to
some
City
facili3es
&
sell
remainder
to
grid.
(Installa3on
areas

iden3fied
&
available) 












500,000
 10
Cocoa
Beach FL Public
Safety Construct
Fire
Sta3on
#
2
solar
powered/LEED

cer3fied
energy‐efficient
ligh3ng
(property
acquired/needs
assessment
done))(must
receive
funding
early
2009
to

complete
by
end
of
2010) 










2,000,000
 70
Cocoa
Beach FL Public
Safety Public
Safety
(combined
police/fire)
facility,solar
powered/LEED

cer3fied
energy‐efficient
ligh3ng
(property
acquired/needs
assessment
done)(must
receive
funding
early
2009
to
complete
by
end
of
2010) 








12,000,000
 100
Cocoa
Beach FL Streets/Roads Asphalt
rejuvina3on
‐
City‐wide
project
to
extend
life
of
exis3ng
paving 












350,000
 10
Cocoa
Beach FL Streets/Roads Comple3on
of
Sidewalk
/Bike
Path
Master
Plan 












150,000
 10
Cocoa
Beach FL Streets/Roads Slipline/replace
stormwater
lines
10,000
b.
@
$40/linear
foot 












400,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Cocoa
Beach FL Streets/Roads SR
520
Landscaping
&
Irriga3on
‐
Intended
to
aid
in
controlling
runoff
to
Indian
River
lagoon 












250,000
 10
Cocoa
Beach FL Streets/Roads Re‐
line
500
manholes
8
b.
depth
@
$250/b. 










1,000,000
 20
Cocoa
Beach FL Streets/Roads Ocean
Beach
Blvd.
use
na3ve
plants/energy‐efficient
ligh3ng.
Intended
to
aid
in
controlling
runoff
to
Indian
River
lagoon.
(design

phase
complete) 










2,000,000
 50
Cocoa
Beach FL Water Infiltra3on
&
Inflow
Assessment
‐

Comprehensive
survey
of
system
to
priori3ze
work
required 












500,000
 5
Cocoa
Beach FL Water Rebuild
and/or
replace

six
(6)
high
service
pumps
(Equipment
iden3fied
&
replacements
specified) 












250,000
 10
Cocoa
Beach FL Water Engineering
evalua3on
of
ASR
site
at
PAFB.
Construct
500,000
GPD
irriga3on
system. 












750,000
 20
Cocoa
Beach FL Water Lib
Sta3on
#
4
Conversion
‐
Major
upgrade
to
"wet
pit"
status 












400,000
 20
Cocoa
Beach FL Water Sewer
System
Rehabilita3on
‐

Rehabilita3on
of
systems
serving

Lib
Sta3ons
#4,
#6
&
#7
(Specific
upgrades
required
are
iden3fied) 










3,000,000
 20
Cocoa
Beach FL Water Improvements
to
six
(6)
process
systems:
(1)
Influent
Handling
Facili3es
(2)
Biological
Treatment
Units
(3)
Clarifiers
(4)
Filters
(5)
Chlorine
contact

(6)
Residuals
Handling
(Study
&
preliminary
cos3ng
done) 








10,938,000
 50
Coconut
Creek FL Public
Safety 4
New
Police
Officers
for
growth
in
city
and
current
crime
trends 












450,000
 4
Coconut
Creek FL Streets/Roads State
Road
7
Median
and
Roadway
Enhancements
to
reduce
conges3on
and
improve
air
quality 










1,000,000
 30
Coconut
Creek FL Streets/Roads Lyons
Road
Construc3on
Improvements
Phase
III
‐
which
includes
transporta3on/pedestrian
and

environmental
enhancements 










1,000,000
 60
Coconut
Creek FL Streets/Roads Lyons
Road
Construc3on
Improvements
Phase
IV
‐
which
includes
transporta3on/pedestrain
and

environmental
enhancements 










1,500,000
 60
Coconut
Creek FL Streets/Roads Coconut
Creek
Parkway
Educa3on
Corridor
(both
phases)
‐
Construc3on/Enhancements
of
exis3ng
highway

linking
five
educa3onal
ins3tu3ons
including
numerous
pedestrian
and
transit
features 










9,000,000
 200
Coconut
Creek FL Transit Construc3on
of
New
Bus
Shelters
to
expand
public
transit 












250,000
 10
Coconut
Creek FL Water Reclaimed
Water
Line
Extension
along
Copans
Road
to
conserve
potable
water
from
Biscayne
Aquifer
linked
to

the
Everglades
and
eliminate
effluent
discharge
into
Atlan3c
Ocean 










1,500,000
 25
Coconut
Creek FL Water Reclaimed
Water
Line
Extension
along
Wiles
Road
to
conserve
potable
water
from
Biscayne
Aquifer
linked
to

the
Everglades
and
eliminate
effluent
discharge
into
Atlan3c
Ocean 










1,000,000
 30
Coral
Gables FL Energy Heat/Cooling
Systems
for
City
owned
proper3es 














40,000
 2
Coral
Gables FL Energy Energy
Management
for
City
owned
proper3es 












250,000
 8
Coral
Gables FL Energy Natural
Gas
Pipeline
for
City
Maintenance
Facility 












300,000
 10
Coral
Gables FL Streets/Roads Storm
Drainage
Const. 










2,000,000
 20
Coral
Gables FL Streets/Roads Pavement
Resurfacing,
Bridge
Improvements,
Traffic
Calming
and
Sidewalk
Extensions 










3,500,000
 35
Coral
Gables FL Streets/Roads Conveyance
Improvements
to
C‐3
Canal
(Dredging) 










7,000,000
 60
Coral
Gables FL Streets/Roads Ponce
de
Leon
Boulevard
Phase
II
and
Phase
III
Improvements 










6,000,000
 60
Coral
Gables FL Streets/Roads Miracle
Mile
Streetscape 










9,500,000
 95
Coral
Gables FL Transit Bus
Route
Expansion 












150,000
 3
Coral
Gables FL Transit Maint.
Facility
Upgrade 












200,000
 5
Coral
Gables FL Transit New
Transit
Buses 










1,600,000
 15
Coral
Gables FL Water Force
Main
Replacement 










2,000,000
 18
Coral
Gables FL Water Mainline
Rehabilita3on 










3,000,000
 25
Coral
Gables FL Water Pump
Sta3on
Upgrades 










4,000,000
 40
Coral
Springs FL CDBG Traffic
Calming:
Traffic
calming
is
a
tool
for
the
City
to
help
improve
the
livability
of
neighborhoods
by
reducing

speeding
and
cut
through
traffic.
Funds
will
be
used
to
install
permanent
speed
humps
in
eligible

neighborhoods. 














50,000
 1
Coral
Springs FL CDBG Repair
City
Hall
Roof 












400,000
 8
Coral
Springs FL CDBG Build
Neighborhood
Transit
Center
and
Parking
Garage 










6,000,000
 80
Coral
Springs FL CDBG Implement
Sample
Road
and
University
Drive
Infrastructure
Master
Plan 










4,000,000
 80
Coral
Springs FL Energy Replace
Althle3c
Field
Ligh3ng
With
Energy
Efficient
Fixtures 












500,000
 2
Coral
Springs FL Public
Safety In‐Car
Digital
Camera
System
for
Police
Patrol
Vehicles 












150,000
 0
Coral
Springs FL Public
Safety Mobile
Command
Unit 












200,000
 0
Coral
Springs FL Public
Safety Northwest
County
Communica3ons
Center
Emergency
Communic3on
Equipment
Upgrade 










6,000,000
 40
Coral
Springs FL Schools Charter
School
Informa3on
Technology
Upgrade 












250,000
 1
Coral
Springs FL Schools Coral
Springs
Charter
School
Roof
Replacement:
replace
exis3ng
roof
with
high
reflec3ve
"green"
coa3ng

material
and
higher
RD
insula3on
to
substan3ally
reduce
solar
heat
gain
and
cooling
load
of
HVAC
equipment,
saving
electrical
energy. 










2,500,000
 40
Coral
Springs FL Streets/Roads Coral
Hills
Drive
Drainage
Improvements 












127,000
 10
Coral
Springs FL Streets/Roads Meadows
and
Dells
Neighborhood
Drainage
Improvement
Project 












750,000
 10
Coral
Springs FL Streets/Roads Roadway
Resurfacing
Program 










1,825,000
 20
Coral
Springs FL Transit 20
Passenger
Bus
with
Lib
to
Transport
Seniors 












100,000
 0
Coral
Springs FL Transit West
Side
Master
Plan
‐
expand
and
modernize
vehicle
repair
facility 












300,000
 2
Coral
Springs FL Transit Bus
Shelter
Installa3on 












120,000
 5
Coral
Springs FL Water Inflow
and
Infiltra3on
Correc3on
Program 












700,000
 10
Coral
Springs FL Water Lib
Sta3on
Rehabilita3on
Program 












980,000
 10
Coral
Springs FL Water Water
Plant
Security
Wall 












400,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Coral
Springs FL Water Conserve
water
and
protect
drinking
water
source
from
chemical
run
off
by
replacing
athle3c
fields
with

ar3ficial
turf 










1,500,000
 12
Coral
Springs FL Water Galvanized
Water
Service
Replacement
Program 










1,000,000
 20
Coral
Springs FL Water Water
Distribu3on
System
Improvements 












900,000
 20
Coral
Springs FL Water New
Raw
Water
Supply
Wells,
Wellheads
&
Transmission
System 










2,500,000
 25
Coral
Springs FL Water Water
Treatment
Plant
Improvements 










3,500,000
 25
Doral FL CDBG NW
107
Ave
Landscaping
improvements 












900,000
 30
Doral FL CDBG Interstate
27/NW
41
Street:
sidewalks
repair/improvements
and
crea3on
of
bikeway 










1,800,000
 60
Doral FL CDBG Public
Works
Department
Building 










3,000,000
 100
Doral FL CDBG City
wide
Bikeway 










6,000,000
 200
Doral FL CDBG Recrea3on
Center 










5,000,000
 225
Doral FL CDBG Police
Building 










8,000,000
 275
Doral FL CDBG City
Hall 








15,000,000
 500
Doral FL CDBG Municipal
Charter
School 








10,000,000
 500
Doral FL CDBG New
Infrastructure
of
a
public
park,
includes
reclaimed
water
use 








30,000,000
 1000
Doral FL Public
Safety Community
Based
programs:
DARE,
GREAT,
RadKids
and
Police
Exxplorers 












330,000
 5
Doral FL Public
Safety City‐Wide
Closed
Circuit
Video
System 










1,000,000
 6
Doral FL Streets/Roads NW
33
St
‐
104‐105
Ave.
Resurfacing 














62,500
 2
Doral FL Streets/Roads NW
112
Ave
25‐34
St:
Resurfacing 














20,000
 5
Doral FL Streets/Roads NW
109
Ave
42‐43
St.
New
Street
Construc3on 












350,000
 11
Doral FL Streets/Roads NW
112
Ave
80St
‐
81
St.
New
Street
Construc3on 












350,000
 11
Doral FL Streets/Roads NW
79
Ave

25‐58 












750,000
 50
Doral FL Streets/Roads NW
33
Street
92‐97
Ave

New
Street
Construc3on 










2,000,000
 65
Doral FL Streets/Roads NW
41
St
79‐87 










2,000,000
 67
Doral FL Streets/Roads NW
102
Ave
66‐74 










3,000,000
 100
Doral FL Transit Trolley:
purchase
of
two
City
Trolleys
to
alleviate
traffic
and
reduce
emmisions 












350,000
 4
Doral FL Water Water
and
Wastewater
Main
installa3on
NW
114Ave 












150,000
 1.5
Dunedin FL Streets/Roads Pinehurst
Road
Reconstruc3on
(between
SR
580
&
San
Christopher
Drive) 












500,000
 18
Dunedin FL Streets/Roads Michigan
Blvd.
Reconstruc3on
(between
County
Road
One
&
US
Alternate
19) 










1,800,000
 24
Dunedin FL Streets/Roads Pinehurst
Road
Reconstruc3on
(between
San
Christopher
Drive
&
Michigan
Blvd.) 










2,000,000
 24
Dunedin FL Streets/Roads San
Christopher
Drive
Reconstruc3on
(between
County
Road
One
&
US
Alternate
19) 










1,800,000
 24
Fort
Lauderdale FL CDBG Melrose
Park
‐
Security
Ligh3ng

In
September
2002,
Melrose
Park,
a
small
residen3al
community
west
of
the
City,
was
annexed
into
the
City
of
Fort
Lauderdale.
Within
a
one
mile
radius
of
Melrose
Park,
there
are
7,114
residents
of
which
2,605
are
youths 












500,000
 2
Fort
Lauderdale FL CDBG Flagler
Drive
Greenway
The
greenway
will
run
along
the
two
west
lanes
of
Flagler
Drive
from
East
Sunrise
Blvd.
to
North
Andrews
Ave. 












700,000
 5
Fort
Lauderdale FL CDBG Osswald
Park
‐
Recrea3on
Amenity
Improvements

Osswald
Park
is
a
30‐acre
community
park
located
in
the
Rock
Island
neighborhood.
It
was
annexed
by
the
City
of
Fort
Lauderdale
in
November
2005
and
is
one
of
the
City’s
busiest
parks.
The
recrea3on
amen 












700,000
 10
Fort
Lauderdale FL CDBG Renova3on
of
South
Side
Cultural
Community
Center

This
request
is
for
funding
to
complete
the
renova3on
of
the
Federal
Historic
designated
South
Side
School
building
as
a
Cultural
Community
Center.
The
design
for
the
building
is
complete
 










4,000,000
 10
Fort
Lauderdale FL CDBG Melrose
Park
Community
Center

This
is
a
funding
request
for
$2
million
to
meet
the
needs
of
this
recently
annexed
youth
oriented
community
by
providing
a
new
community
recrea3on
center,
security
and
site
ligh3ng
and
parking.
 










2,000,000
 15
Fort
Lauderdale FL CDBG Summer
Youth
Program

The
City
of
Fort
Lauderdale
is
interested
in
expanding
its
Summer
Youth
Employment
Program
to
provide
posi3ve
experien3al
workplace
learning
opportuni3es
for
addi3onal
area
teens
during
the

summer
months.
 












300,000
 100
Fort
Lauderdale FL Public
Safety Electronic
Traffic
Cita3on
Process

This
project
would
implement
electronic
versions
of
traffic
cita3ons.
On
January
10,
2005,
the
City
was
advised
that
the
Broward
County
courts
would
now
accept
electronic
versions
of
traffic
cita3ons. 












592,200
 0
Fort
Lauderdale FL Public
Safety This
request
is
to
provide
funding
for
three
(3)
large
solar‐powered
traffic
message
board
signs
for
our
Patrol
Districts
and
one
(1)
mini‐message
board
sign
to
replace
an
exis3ng
sign.
Solar
traffic
message
board
signs
have
the
capability
of
communica 














93,600
 0
Fort
Lauderdale FL Public
Safety Police
Digital
In‐Car
Video
Cameras/Technology
Packages


Two
hundred
and
sixty
nine
(269)
of
the
City
of
Fort
Lauderdale
Police
Department’s
marked
police
vehicles
are
being
equipped
with
digital
in‐car
video
cameras/technology
packages.
One
hundred
 










1,500,000
 5
Fort
Lauderdale FL Public
Safety Interoperable
Communica3ons
Upgrade/P25
Compliance

Funding
requested
for
this
project
will
enhance
the
present
radio
system
that
serves
all
City
of
Fort
Lauderdale
opera3ons,
including
its
Fire‐Rescue,
Police,
and
Public
Works
departments,
as
well
a 








30,000,000
 20
Fort
Lauderdale FL Streets/Roads SW
11
Avenue
Swing
Bridge
Rehab‐
Rehabilita3on
of
a
Warren
Pony
steel
truss
bridge
constructed
around

1924 










6,000,000
 10
Fort
Lauderdale FL Streets/Roads ADA
Sidewalk
and
Beach
Erosion
Protec3on
Improvement:
The
exis3ng
sidewalk
and
wall
have
severely

deteriorated
resul3ng
in
a
non‐ADA
compliant
walkway
and
limited
protec3on
from
sand
erosion.


Replacement
of
the
wall
and
sidewalk
will
bring
the
lot
in 










3,400,000
 20
Fort
Lauderdale FL Streets/Roads Dorsey
Riverbend
Neighborhood
Improvement
and
Traffic
Calming:
Neighborhood
enhancement
through
a

traffic
claiming
strategy
for
safety
and
economic
growth
in
Northwest
Fort
Lauderdale. 










2,000,000
 20
Fort
Lauderdale FL Streets/Roads NW
Neighborhood
Improvements
neighborhood
pedestrian
and
safety
improvement
project
to
consist
of

improvements
to
the
sidewalk
and
pedestrian
access,
ligh3ng
and
landscaping
improvements
with
in
the
Durrs

and
Home
Beau3ful
Park
neighborhood
for
safety,
 










4,000,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Fort
Lauderdale FL Streets/Roads Many
of
the
City's
48
bridges
are
func3onally
obsolete
or
structurally
deficient.

Repair
of
bridges 










2,000,000
 50
Fort
Lauderdale FL Streets/Roads Many
of
the
City's
48
bridges
are
func3onally
obsolete
or
structurally
deficient.

Replacement
of
bridges 








12,000,000
 50
Fort
Lauderdale FL Streets/Roads NE/NW
6
Street
(Sistrunk
Blvd)
Streetscape
and
Enhancement
Project:
An
infrastructure,
streetscape

enhancement
and
a
community
redevelopment
project
with
the
main
objec3ve
of
improving
the
quality
of
life

and
s3mula3ng
economic
growth
and
redevelopment 










4,000,000
 50
Fort
Lauderdale FL Streets/Roads Regularly
scheduled
road
resurfacing
will
prevent
further
deteriora3on
of
City’s
roadway
system.









11,000,000
 50
Fort
Lauderdale FL Water Forcemain
and
Water
Main
Improvements
‐
City‐Wide
System
Interconnects:
This
project
includes
comple3on

of
7
cri3cal
interconnects
required
to
change‐over
from
older
transmission
systems
to
recently
constructed

systems
in
order
to
address
capacity
 










3,135,000
 6
Fort
Lauderdale FL Water Contracted
Sewer
System
Rehabilita3on
(Re‐lining)
‐
2010:
These
projects
include
the
re‐lining
of
sanitary

sewers
in
areas
iden3fied
as
having
high
levels
of
infiltra3on
and
inflow
(I&I),
and
where
the
effect
of
the

improvements
can
be
monitored
and
th 










3,300,000
 8
Fort
Lauderdale FL Water Water
Main
Improvements
‐
SE
1
Ave
and
SW
7
Ave
River
Crossings:

Two
cri3cal
water
main
crossings
of
the

New
River
at
SE
1
Ave
and
SW
7
Ave
are
in
need
of
replacement,
the
crossing
at
SE
1
Ave
has
recently
failed

and
is
out
of
service.
 












800,000
 8
Fort
Lauderdale FL Water Water
Storage
and
Transmission
Improvements
‐
NW
2
Ave
Tank
and
High
Service
Pump
Sta3on:
This
project

includes
improvements
to
an
exis3ng
1.0
million
gallon
elevated
storage
tank
and
pump
sta3on,
including

repairs,
cleaning,
and
pain3ng
of
the
tank;
 










3,000,000
 8
Fort
Lauderdale FL Water Stormwater
Improvements:
Installing
underground
stormwater
collec3on
system
will
assist
in
allevia3ng

localized
flooding
and
will
create
safe
environment
for
residents. 










1,200,000
 10
Fort
Lauderdale FL Water Water
Main
Improvements
‐
Imperial
Point
Phase
II
–
NE
56
St
between
N.
Andrews
Ave.
and
NE
9
Ave:
This

project
includes
comple3on
of
a
cri3cal
16‐inch
water
transmission
main
necessary
to
meet
water
demands
in

the
northeast
sec3on
of
the
City.
 












830,000
 15
Fort
Lauderdale FL Water Water
Main
Improvements
‐
South
Andrews
Ave:
This
project
includes
construc3on
of
15,000
linear
feet
of

water
main
to
replace
a
failing
transmission
main
and
replace
it
with
a
larger
water
main,
and
to
replace
old

and
undersized
distribu3on
mains
 










4,500,000
 20
Fort
Lauderdale FL Water Fiveash
Water
Treatment
Plant
Upgrades
‐
Phase
II:
Water
supply
constraints
have
resulted
in
extended
and

increased
reliance
on
the
City’s
Fiveash
Water
Treatment
Plant
(WTP),
resul3ng
in
the
need
to
implement

weather‐proofing
and
storm
hardening
improvements 








13,000,000
 25
Fort
Lauderdale FL Water Water
Main
Improvements
‐
North
Andrews
Ave:
This
project
includes
replacement
of
4,800
linear
to
replace

an
old
and
failing
transmission
main
and
replace
and
upsize
it
provide
adequate
and
reliable
water
supply
to

the
downtown
Fort
Lauderdale
water
district 










1,300,000
 30
Fort
Myers FL CDBG Citywide
ADA
Compliance
Renova3ons
Hurricane
Protec3on
of
Selected
City
Facili3es
Clemente
Park
Citywide
Drainage
Rehab/Drainage
Improvements
Dean
Park
Neighborhood
Improvements
Manuels
Branch
Watershed
Drainage
Improvements









25,340,000
 460
Brookhill
Subdivision
Fort
Myers FL Streets/Roads Street
Overlay
Program
Citywide
New
Sidewalk
Installa3on
Sidewalk
Replacement
Program
Hanson
St.
Ext/Cocos‐Or3z
Ave
McGregor/Virginia
Ave
Roundabout
Edison
Ave
Realign/Virginia‐Cleveland‐Cortez
Veronica
Shoemaker
Blvd.
Sidewalk/Canal
Imp









44,175,000
 731
SR80
Acc
Fort
Myers FL Water Odor
Control
Equipment
CWWTP
Injec3on
Well‐DEP
Requirement
CWWTP
Reclaimed
Water
Produc3on
100%
CWWTP
Reuse
Facility
at
South
Plant
SWWTP
Injec3on
Well‐DEP
Requirement
SWWTP
Odor
Control
Upgrade
SWWTP







213,738,000
 2167
U3lity
Reloca3on
‐
Colonial
Widening
East
o
Gretna FL CDBG Highway
12
Water
and
Sewer
Line
Extension 










4,538,000
 50
Gretna FL CDBG Bofle
Water
with
recyclable
bofles 










4,510,000
 101
Gretna FL Public
Safety Gretna
On
Wi‐Fi
Installa3on
of
City
Wide
Broadband 










1,000,000
 3
Gretna FL Public
Safety Project
Ramp
Up
Expansion
of
Public
Safety
Services 












140,512
 3
Gretna FL Streets/Roads Project
‐
GO
Widening
of
Roads
and
Installa3on
of
Side
Walk 










2,373,800
 10
Gretna FL Water Project
Reclaim
It
Effec3ve
Use
of
Treated
Wastewater 










1,000,000
 3
Hallandale
Beach FL CDBG Atlan3c
Shores
Blvd.
Water
Quality
and
Drainage
Improvements
For
three
years
the
City
has
sought
unsuccessfully
to
obtain
funding
for
this
project,
which
will
have
the
dual

benefit
of
improving
drainage
and
stormwater
quality.

The
project
entails
a
seg 












700,000
 7
Hallandale
Beach FL CDBG Northeast
Quadrant
Drainage
Improvements
The
City’s
Northeast
Quadrant
has
been

subject
to
repe33ve
flooding
and
is
in
need
of
extensive
drainage

improvements.
This
project
is
designed
to
greatly
mi3gate
the
flooding.

It
will
include
both
installa3 










2,000,000
 20
Hallandale
Beach FL CDBG Subaqueous
Forcemain
Crossing
(Intracoastal)
In
order
to
protect
against
poten3al
failure
of
a
very
old
forcemain
and
in
order
to
accommodate
future

growth,one
subaqueous
20”
forcemain
measuring
approximately
9,500
feet
must
be
installed.











1,000,000
 20
Hallandale
Beach FL CDBG Subaqueous
Water
Main
Crossings
(Intracoastal)
In
order
to
meet
current
needs
and
accommodate
future
growth,
two
subaqueous
16”
water
mains
must
be

installed.
The
combined
total
length
of
the
crossings
is
approximately
1,000
feet.

An
addi3onal
6,500
fe 










2,000,000
 25
Hallandale
Beach FL Streets/Roads NE
8th
and
10th
Ave.
Two‐way
Conversion
In
order
to
meet
the
traffic
needs
of
the
community,
the
City
is
planning
to
convert
these
two
on‐way
streets

into
two‐way
streets.

Both
streets
are
approximately
4,000
feet
in
length. 










1,500,000
 10
Hallandale
Beach FL Water Reloca3on
of
City
Produc3on
Wells
Because
of
the
destruc3ve
effects
of
saltwater
intrusion,
the
City
has
lost
most
of
its
produc3on
wells.


reloca3on
of
wells
is
required
to
ensure
the
City’s
future
water
supply.

It
is
an3cipated
the
new
wells
wil 










3,000,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Hallandale
Beach FL Water Water
Main
Replacement
Undersized
water
mains
throughout
the
City
need
to
be
replaced
by
larger
ones.

The
total
length
requiring

replacement
is
approximately
20,000
feet. 










3,000,000
 15
Hallandale
Beach FL Water Water
Treatment
Plant
Expansion
The
City
has
completed
the
first
pahse
of
a
water
treatment
plant
and
the
design
and
infrastructure
is
in
place

to
add
addi3onal
capacity
of
nine
million
addi3onal
gallons
of
treated
water.
 








47,000,000
 30
Hialeah FL Amtrak One
Amtrak
Sta3on

Hialeah
Upgrades/
Roadway
access
improvements 








15,000,000
 500
Hialeah FL CDBG Neighborhood
Center

Construc3on 










4,000,000
 200
Hialeah FL CDBG Police
Sub
Sta3on 










2,500,000
 250
Hialeah FL CDBG Roadway
Improvements/Infrastructure 








20,000,000
 300
Hialeah FL CDBG Job
Training 










2,000,000
 500
Hialeah FL Energy Public
Facili3es

Energy
efficient
re‐
design/green
compliance 








10,000,000
 500
Hialeah FL Energy Vehicle
Conversion/
UpgradeFleet
(hybrid,
propane,
Flex

fuel) 








10,000,000
 500
Hialeah FL Housing City

Owned

Housing 








25,000,000
 500
Hialeah FL Public
Safety Domes3c
Violence
preven3on 












550,000
 10
Hialeah FL Public
Safety Police

Cops 










5,000,000
 25
Hialeah FL Public
Safety Byrne
/
Technology

Upgrades 










1,000,000
 50
Hialeah FL Public
Safety Vehicle
Purchase/
Equipment 










2,000,000
 200
Hialeah FL Schools Charter
school
Development 










4,500,000
 500
Hialeah FL Streets/Roads Street
Infrastructure 








15,000,000
 500
Hialeah FL Transit Purchase
of

energy
efficient
buses 










2,000,000
 100
Hialeah FL Water Reverse
Osmosis
Plant 








80,000,000
 3000
Hollywood FL Energy Energy
Efficient
Upgrades
to
City
Facili3es 










2,000,000

Hollywood FL Energy Streetlight
Replacement
to
Energy
Efficient
Fixtures 










8,000,000

Hollywood FL Energy Retrofit
of
the
Public
Works
Opera3ons
Center
to
harness
wind
power
for
the
building's
energy
needs. 










1,300,000
 2
Hollywood FL Energy Convert
a
closed
trash
transfer
sta3on
into
a
neighborhood
friendly
green
waste
mulching/recycling
center. 










2,500,000
 12
Hollywood FL Public
Safety Fire
Sta3on
Replacement 










7,500,000

Hollywood FL Public
Safety Police
Administra3on
Facility 








50,000,000

Hollywood FL Streets/Roads Alley
Reconstruc3on 










5,000,000

Hollywood FL Streets/Roads Street
Resurfacing 










2,000,000

Hollywood FL Water 1500
KW
generator
(#3)
as
backup
for
en3re
plant.
Switchgear
and
instrumenta3on. 










1,000,000

Hollywood FL Water Acid
(Pre‐Treatment)
Pipe
Replacement
plus
Addi3on
of
Pipe
Post‐Treatment 












300,000

Hollywood FL Water Addi3on
of
2
New
Sodium
Hypochlorite
Genera3on
Cells
and
Related
Storage
Tanks 












805,000

Hollywood FL Water Addi3on
of
Valve
Controls
and
Misc.
Repairs
to
Injec3on
Wells 














80,000

Hollywood FL Water Assessment
of
Steel
Filters
and
Spiractors
Structural
Integrity 












100,000

Hollywood FL Water Bar
Screens
Rehab
and
Repairs 








14,000,000

Hollywood FL Water Chlorina3on
Facility
Rehab 












140,000

Hollywood FL Water Clarifier
Nos.
5‐6
Rehabilita3on 










2,150,000

Hollywood FL Water Clean,
Recoat
and
Reseal
the
Containment
Area
for
the
Chemical
Storage
Tanks 












200,000

Hollywood FL Water Computer
Control
System
Upgrade
‐
Wastewater
Treatment
Plant 










1,100,000

Hollywood FL Water Conserva3on
Phase
I 












200,000

Hollywood FL Water Conserva3on
Phase
II 












300,000

Hollywood FL Water Conserva3on
Phase
III 












500,000

Hollywood FL Water Construct
McKinley
St.
Parallel
Interceptor 








14,000,000

Hollywood FL Water Con3nue
GIS
Database
Improvement 












800,000

Hollywood FL Water Con3nue
Gravity
System
Condi3on
Assessment
and
Renewl/Repl
(I/I) 








20,000,000

Hollywood FL Water Conversion
/
Upgrade
of
Sewer
PS
W‐03
(currently
under
design) 












709,000

Hollywood FL Water Deep
Injec3on
Well
for
MS/RO
Concentrate
Disposal 








17,500,000

Hollywood FL Water De‐grit
Oxygena3on
Trains 










3,000,000

Hollywood FL Water Develop
Collec3on/Transmission
System
Hydraulic
Model 












800,000

Hollywood FL Water Dixie
Highway
Corridor 










6,000,000

Hollywood FL Water Effluent
PS
Rehab 








14,641,000

Hollywood FL Water Effluent
PS‐Gravity
Disposal
System
Replacement
and
Other
Repairs 










1,600,000

Hollywood FL Water Evalua3on
&
Replacement
of
Flow
Meter
at
Water
Treatment
Plant 










1,100,000

Hollywood FL Water Expand
Blend
Tank 










1,000,000

Hollywood FL Water Floridan
Wells
F10
&
F13
Wellhead
Piping,
Pumps
and
Vaults
(DCA
project) 










1,400,000

Hollywood FL Water Floridan
Wells
F14
&
F15
and
Associated
Transmission
Mains
(DCA
project) 










4,000,000

Hollywood FL Water Grit
Removal
System
Rehab
and
Replacement 








19,500,000

Hollywood FL Water High
Service
Pump
Facility
Rehabilita3on
and
Upgrade 










2,000,000

Hollywood FL Water I/I
Basins
H‐11,
H‐15W
and
H‐31 










5,200,000

Hollywood FL Water Influent
Pump
Sta3on
Repairs 












300,000

Hollywood FL Water Install
US
441
/
State
Road
7
Corridor
Sewer 










8,000,000

Hollywood FL Water Installa3on
of
Chemical
Feed
System
Flowmeters 














50,000

Hollywood FL Water Integrate
Ammonia
Feed
System
into
the
Plant's
SCADA
System 












100,000

Hollywood FL Water Integrate
Sodium
Hypochlorite
Feed
System
into
the
Plant's
SCADA
System 












100,000

Hollywood FL Water Intracoastal
Crossing
Pipe
Replacement
(Lib
Sta3on
E‐3
Force
Mains) 










2,590,000

Hollywood FL Water Lib
Sta3on
Conversions/Upgrades 










8,400,000

Hollywood FL Water Mechanical
Integrity
Test
for
Injec3on
Wells 












330,000

Hollywood FL Water Mechanical
Rehab
of
Three
Floridan
Wells
(F2,F3
&
F5) 












800,000

Hollywood FL Water New
14,000
gpm
High
Service
Pump
(HSP) 












500,000

Hollywood FL Water Ouzall
Rule
Change
Compliance
Projects
(deep
wells
with
HLD) 








92,800,000

Hollywood FL Water Oxygena3on
Trains
Nos.
1‐5
Rehab
&
42"
Influent
CIP
Liner 










1,030,000

Hollywood FL Water Pain3ng
and
Restora3on
of
Two
(2)
Elevated
Water
Tanks 










2,500,000

Hollywood FL Water Pain3ng
and
Restora3on
of
Water
Treatment
Plant
Facili3es 










2,000,000

Hollywood FL Water Pain3ng
Wastewater
Treatment
Plant 












200,000

Hollywood FL Water Plan
Assessment
of
Large‐Diameter
Reinforced
Concrete
Pipe
Condi3on 














80,000

Hollywood FL Water PLC
Replacement
at
SRWWTP 












550,000

Hollywood FL Water Provide
High
Level
Monitoring
and
Trending
of
Data
Values
from
the
LIMS
and
SCADA
Systems 












100,000

City State Program Project
Descrip3on Funding
Required Jobs
Hollywood FL Water RAS
Pump
Sta3ons
Repairs
and
Upgrades 












270,000

Hollywood FL Water Reactor
Feed
Pumps
Replacement
at
the
Residuals
Facility 










3,000,000

Hollywood FL Water Rehab
of
Clarifier
Nos.
5‐8
Flow
Distribu3on
Box 










2,100,000

Hollywood FL Water Repair
of
Cracks
in
Filters
and
Administra3on
Building 












350,000

Hollywood FL Water Repair
or
Upgrading
of
Flow
Distribu3on
Box.

North
and
South
Electric
Service
Centers 












440,000

Hollywood FL Water Replace
Lime
Slakers
and
Lime
Feed
System
(4
units) 










1,600,000

Hollywood FL Water Replace
PS
E‐02
Force
Main
and
ICW
Crossing 










1,500,000

Hollywood FL Water Replace
PS
E‐07
Pumps 












600,000

Hollywood FL Water Replace
PS
N‐02
Pumps 












448,000

Hollywood FL Water Replace
PS
N‐03
Pumps,
Force
Main
and
Gravity
Piping 












478,000

Hollywood FL Water Replace
PS
N‐04
Pumps,
Force
Main
and
Gravity
Piping 










1,158,000

Hollywood FL Water Replace
R.O.
Train
"B" 










3,000,000

Hollywood FL Water Replacement
and/or
Rehabilita3on
of
Reuse
Facili3es 










1,330,000

Hollywood FL Water Replacement
of
the
Reclaimed
Water
Pumps 














50,000

Hollywood FL Water Retrofit
RO
Skid‐Train
A 










1,600,000

Hollywood FL Water Reuse
System
Storage
Tank 










5,000,000

Hollywood FL Water RO
Train
D
(2
mgd) 










3,000,000

Hollywood FL Water RO
Train
E
(2
mgd) 










3,000,000

Hollywood FL Water Sludge
Cake
Pumps
Repl
and
Misc
Repairs 










4,400,000

Hollywood FL Water SRWWTP/Collec3on/Transmission
System
Data
Historian
Upgrade 














75,000

Hollywood FL Water Switchgear
Cleaning,
Recalibra3ng
and
Tes3ng 












125,000

Hollywood FL Water Tab
St.
Interceptor
Rehab 










7,000,000

Hollywood FL Water Upgrade
Ammonia
System
from
Gas
to
Liquid 












160,000

Hollywood FL Water Upgrade
the
Exis3ng
MS
Feed
Pumps
to
VFD 












650,000

Hollywood FL Water Upgrade
the
remote
telemetry
site
PLCs
and
in‐plant
PLCs 












480,000

Hollywood FL Water U3li3es
Reloca3ons
to
Support
SR7
Widening 










4,000,000

Hollywood FL Water WAS
System
Rehab 












250,000

Hollywood FL Water Wastewater
Capacity
Analysis 












100,000

Hollywood FL Water Water
Distribu3on
Upgrades 














34,000

Hollywood FL Water Water
Distribu3on
Upgrades 














48,000

Hollywood FL Water Water
Distribu3on
Upgrades 














84,000

Hollywood FL Water Water
Distribu3on
Upgrades 














87,000

Hollywood FL Water Water
Distribu3on
Upgrades 














96,000

Hollywood FL Water Water
Distribu3on
Upgrades 












130,000

Hollywood FL Water Water
Distribu3on
Upgrades 












144,000

Hollywood FL Water Water
Distribu3on
Upgrades 












164,000

Hollywood FL Water Water
Distribu3on
Upgrades 












240,000

Hollywood FL Water Water
Distribu3on
Upgrades 












423,000

Hollywood FL Water Water
Distribu3on
Upgrades 












810,000

Hollywood FL Water Water
Distribu3on
Upgrades 










1,000,000

Hollywood FL Water Water
Distribu3on
Upgrades
at
the
North
End
of
A1A 










1,000,000

Hollywood FL Water Water
Main
Replacement
Program 










5,000,000

Hollywood FL Water Water
Treatment
Plant
South
Header
Rehabilita3on 












360,000

Hollywood FL Water West
Hollywood
Pumping
and
Storage
Facility 










4,000,000

Hollywood FL Water WS
Offseqng
Reuse
Planning,
Demonstra3on
and
Related
Ac3vi3es. 










5,000,000

Hollywood FL Water WTP
Emergency
Generator
#4. 










1,100,000

Homestead FL Energy Electrical
U3lity
System
Automa3on:

Installa3on
of
intelligent
line
reclosers
and
line
sec3onalizers
in
the

Distribu3on
Circuits
to
decrease
customer
minutes

interrup3ons
opening
faster
the
faulty
distribu3on
circuit

sec3on. 










2,000,000
 40
Homestead FL Energy Increase
Substa3ons
Capacity:
Installa3on
of
two
40
MVA
Power
Transformers
at
Redland
&
Renaissance

Substa3ons
due
to
increase
of
the
system
peak
from
89
MW
to
expected
125
MW
in
2015.

 










3,000,000
 40
Homestead FL Energy 138
KV
Transmission
Loop
and
Second
Interconnec3on
with
the
FPL
BPS:

Improving
reliability
standards

building
a
138
KV
Transmission
Line
ring
between
Renaissance
and
Redland
Substa3ons,
and
create
a
second

point
of
interconnec3on
with
the
FPL.
 










5,000,000
 60
Homestead FL Energy Administra3on
and
T&D
Facili3es:

Construc3on
of
a
building
facility
to
host
Customer
Service
System

Opera3on
&
Control
Center
and
the
U3lity
administra3on
area
in
one
loca3on
to
improve
management

efficiency.

 










2,500,000
 60
Homestead FL Energy Hardening
the
13
kV
Electrical
Distribu3on
System:

Hardening
the
distribu3on
system
in
2
phases;
(1)

underground
secondary
services
&(2)
underground
primary
Laterals.
Also,
for
OH
pole
inspec3on
&

replacement
from
wood
to
concrete
or
steel
poles.

 








12,500,000
 90
Homestead FL Energy Installa3on
of
New
Genera3on
Units:

Installa3on
of
two
25
MW
units
LM2500’s
to
balance
system
load
and

resources.

The
installa3on
of
new
higher
efficiency
generators
will
reduce
energy
waste
and
also
reduce
the

carbon
footprint. 








47,000,000
 100
Homestead FL Public
Safety Informa3on
Technology
to
include
hardening
of
City
infrastructure,
upgrade
exis3ng
fiber
infrastructure
to

single
mode
fiber
and
reposi3on
into
underground
conduit.
Install
permanent
emergency
generators
at
both

the
City
datacenter
and
PBX.
 










1,500,000
 15
Homestead FL Public
Safety Citywide
WiFi
free
wireless
internet
access:

This
project
would
create
a
wireless
network
to
provide
free

access
to
all
residents
of
the
City.

This
would
enhance
the
communica3on
between
government
and
general

public. 










2,000,000
 40
Homestead FL Public
Safety Citywide
Safety
Cameras.

Cameras
will
provide
increasing
coverage
of
police
presence
in
an
effort
to

discourage
&
reduce
crime
ac3vity.
Project

will
provide
the
general
public
w/
peace‐of‐mind
&
added

protec3on.
 








20,000,000
 90
Homestead FL Public
Safety Construc3on
of
New
City
Hall:
The
exis3ng
City
hall
is
not
adequate
to
house
all
depts
required
to
provide
svcs

to
the
growing
popula3on.

New
bldg
was
designed
to
meet
strict
requirements
of
LEEDS
silver
cer3fica3on
as

a
green
building.
 








35,000,000
 100
Homestead FL Public
Safety LEED
Cer3fica3on
of
City
Buildings
to
meet
cer3fied
guidelines
including
major
renova3ons. 








35,000,000
 100
Homestead FL Public
Safety Police
Headquaters'
Bldg:

The
City
of
Homestead
has
experienced
rapid
popula3on
growth
which

requires
the

expansion
of
the
police
depts
making
the
exis3ng
bldg
inadequate
to
house
and
provide
the
svcs
in
an
efficient

manner. 








40,000,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Homestead FL Streets/Roads Ligh3ng
improvements
at
SW
328
Street:

Installa3on
of
light
poles
along
SW
328
St
from
SW
137
Ave
to
US1.


This
project
would
result
in
safer
driving
condi3ons.
 










1,600,000
 30
Homestead FL Streets/Roads Intersec3on
Improvement
at
SW
328
St
and
US1;

at
US1
&
SW
312
St;
&
at
Krome
Ave
and
SW
312
St.

Projects

will
improve
traffic
flow,
reducing
travel
3me
&
impact
on
the
environment
from
carbon
emissions. 










2,000,000
 35
Homestead FL Streets/Roads Mowry
Dr
Roadway
Improvements:

Widening
of
Roadway
from
2
lane
to
2
lane

w/
dedicated
con3nuous
Leb

Turn
lanes.

Drainage
system
improvements
as
per
highway
standards
from
Krome
Ave
West
to
SW
187
Ave.
 










6,000,000
 50
Homestead FL Streets/Roads SW
162
Ave
Expansion
from
SW
312
St
to
SW
328
St.

Widening
of
Roadway
from
2
lane
to
4
lane
Median

Divided
Roadway
with
dedicated
Leb
Turn
lanes
(includes
Bridge
replacement).











6,500,000
 65
Homestead FL Streets/Roads Campbell
Dr
Improvements:
Widening
of
Rdway
from
2
lane
to
6
lane
Median
Divided
Rdway
with
dedicated

Leb
Turn
lanes.

Campbell
Drive
‐
from
SW
157
Ave
to
SW
182
Ave.
Improvement
will
reduce
travel
3me
&

conges3on
thereby
reducing
the
carbon
footprint. 








20,000,000
 70
Homestead FL Streets/Roads Lucy
St
Expansion
(SW
328
St
from
US1
to
SW
187
Ave).

Widening
of
Rdway
from
2
lane
to
4
lane
Median

Divided
Rdway
w/
dedicated
Leb
Turn
lanes.
(SW
328
St
from
US1
to
SW
187
Ave).


Improvement
will
reduce

travel
3me
&
conges3on,
carbon
footprint. 










8,000,000
 70
Homestead FL Streets/Roads North
Canal
Dr
Expansion:
Widening
of
Rdway
from
2
lane
to
4
lane
Median
Divided
Rdway
w/
dedicated
Leb
Turn
lanes.

From
SW
137

Ave
to
US1.
Improvement
will
reduce
travel
3me
&
conges3on,
carbon
footprint
&
improve
the
quality
of
life
&

environment.









21,000,000
 70
Homestead FL Streets/Roads Addi3onal
Turnpike
Access
Ramps
at
Campbell
(SW
312
Street):

Addi3onal
West
to
North
and
South
to
West

Ramps.

Improvement
will
reduce
travel
3me
&
conges3on
thereby
reducing
the
carbon
footprint
&
improve

the
quality
of
life
and
environment. 










7,000,000
 80
Homestead FL Streets/Roads New
Turnpike
Access
Ramps
at
North
Canal
Drive
(SW
328
Street):

New
West
to
North
and
South
to
West

Ramps.

Will
reduce
travel
3me
and
conges3on
thereby
reducing
the
carbon
footprint
and
improve
the
quality

of
life
and
environment. 










7,000,000
 80
Homestead FL Streets/Roads Campbell
Drive
widening
from
4
lane
divided
to
a
6
lane
divided
roadway.
Improvement
will
reduce
travel
3me,

traffic
concurrency
and
conges3on.
It
will
improve
traffic
concurrency
and
new
businesses. 








20,000,000
 100
Homestead FL Streets/Roads Citywide
Sidewalk
construc3on
program.


Project
includes
the
addi3on
of
sidewalks
on
all
city
roads.

Project

will
encourage
the
use
of
alterna3ve
transporta3on
modes
&
reduce
impact
of
carbon
emissions
by
providing
a

clean
&
safe
mode
of
travel. 








20,000,000
 110
Homestead FL Water Wrt
&
Wstwtr
Telemetry:
Purchase
&
installa3on
of
telemetry
equipmt.
Telemetry
in
all
pumps
sta3on
sends

flow/performance
data
&
alarm
situa3ons
to
a
central
loca3on
that
increase
reliability
&
control
before,
during

&
aber
a
disaster.
 










1,500,000
 20
Homestead FL Water Water
storage
tanks:

2
MG
storage
tank
required
to
increase
reliability
and
handling
of
peak
demands
for

potable
water.

This
tank
is
needed
to
increase
storage
at
the
north
east
sec3on
of
the
city. 










5,000,000
 40
Homestead FL Water Headworks
and
Pre‐treatment:

Construc3on
of
screening,
de‐griqng
and
pumping
facili3es
at
exis3ng

Wastewater
Treatment
plant.

Will
provide
added
efficiency
to
the
current
treatment
process
at
the
plant

resul3ng
in
befer
quality
effluent.

 








20,000,000
 140
Homestead FL Water Increase
capacity
Wtr
Treatment
Plant:

Expand
&
increase
capacity
at
Wtr
Plant.
Reverse
Osmosis
treatment

process
for
treatment
will
result
in
befer
potable
wtr
quality
by
removing
most
cons3tuents
&
improving

health
&
welfare
of
the
general
public. 








50,000,000
 140
Homestead FL Water City‐Wide
Stormwater
Improvement:

Design
and
construct
storm
water
collec3on
and
storage
facili3es
to

improve
protec3on
against
flooding
during
and
aber
mayor
rain
and
storm
events.









25,000,000
 150
Homestead FL Water Wstwtr
Treatment
Plant
Expansion:

Expand
treatment
capacity...6
MGD
to
10
MGD.
Rapid
popula3on
growth

resulted
in
increased
demand
for
wstwtr
svcs.
Plant
expansion
would
provide
needed
capacity
&
meet


agencies'
an3cipated
treatment
requirements. 








90,000,000
 250
Jacksonville FL Airport Building
hardening 










5,000,000
 10
Jacksonville FL Airport Taxi
way
restora3on 








10,000,000
 50
Jacksonville FL Amtrak Building
Improvements
Various
Areas 










5,000,000
 10
Jacksonville FL Amtrak Signing
and
Signaliza3on
Upgrades 










5,000,000
 10
Jacksonville FL CDBG Countywide
Drainage
System
Rehab 










7,500,000
 15
Jacksonville FL CDBG Hogans
Creek
rehabilita3on 








10,000,000
 20
Jacksonville FL CDBG McCoys
Creek
rehabilita3on 








10,000,000
 20
Jacksonville FL Energy Southeast
Area
Water
Distribu3on
System 










7,500,000
 7
Jacksonville FL Energy Jax
Muncipal
Stadium
HVAC
upgrade 










2,500,000
 10
Jacksonville FL Energy Public
Buildings
systems
retrofit 








10,000,000
 10
Jacksonville FL Energy Southeast
Area
Reclaimed
Water
System 










7,500,000
 30
Jacksonville FL Housing stormwater
retrofits
various
loca3ons 










7,500,000
 30
Jacksonville FL Housing Building
renova3ons
various
areas 








10,000,000
 50
Jacksonville FL Public
Safety Radio
Infrastructure
PH.
I 










4,000,000
 5
Jacksonville FL Public
Safety Sheriffs
Office
Gun
Range
Upgrade 










1,000,000
 5
Jacksonville FL Public
Safety Emergency
Ops
Center
Hardening 










1,000,000
 7
Jacksonville FL Public
Safety FIre
Rescue
CAD
system 










2,000,000
 10
Jacksonville FL Public
Safety Jacksonville
Correc3ons
Center
at
Lannie
Road
Building
Improvements 










5,000,000
 10
Jacksonville FL Public
Safety Jacksonville
Pre‐Trial
Deten3on
Center 










5,000,000
 10
Jacksonville FL Public
Safety Fire
Sta3on
#61 










3,000,000
 25
Jacksonville FL Public
Safety Fire
Sta3on
#62 










3,000,000
 25
Jacksonville FL Schools Building
System
retrofits
various
loca3ons 










5,000,000
 15
Jacksonville FL Schools Northwest
District
Stormwater
retrofit 










5,000,000
 25
Jacksonville FL Schools Southeast
District
Stormwater
System
Retrofit 










5,000,000
 25
Jacksonville FL Streets/Roads Traffic
Sinage
County‐wide 










5,000,000
 10
Jacksonville FL Streets/Roads Norhtwest
Area
resurfac3ng 








10,000,000
 20
Jacksonville FL Streets/Roads Southeast
Area
resurfacing 








10,000,000
 20
Jacksonville FL Transit Downtown
signaliza3on
retrofit 










2,500,000
 10
Jacksonville FL Transit ITS
enhancments
at
challenged
intersec3ons 










5,000,000
 15
Jacksonville FL Transit Jacksonville
Transporta3on
Center 










5,000,000
 15
Jacksonville FL Water Northwest
Area
water
distribu3on
system 










7,500,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Jacksonville FL Water Southeast
Area
Reclaimed
Water
System 










7,500,000
 30
Jacksonville FL Water Southeast
Area
Water
Distribu3on
System 










7,500,000
 30
Jacksonville FL Water Northwest
Area
sewerage
system 








15,000,000
 60
Jacksonville FL Water Southeast
Area
sewerage
system 








15,000,000
 60
Jacksonville FL Water Wastewater
Treatment
System
enhancements
countywide 








20,000,000
 70
Key
Biscayne FL Water Replace
sep3c
tank
systems
for
706
residen3al
homes
to
sanitary
sewers
and
replace
50‐year
old
asbestos

water
mains.
Key
Biscayne
is
an
island
and
sep3c
tank
materials
overflow
and
impact
Biscayne
Bay
and
the

project
is
required
by
our
Master
Plan
file 










5,000,000
 60
Lakeland FL CDBG Freedom
Park
(Downtown
Park
and
open
space
ini3a3ve
supported
by
the
Na3onal
Park
Service)

Freedom

Park
is
a
1.2
acre
urban
park
designed
as
a
neighborhood
park
adjacent
o
the
City’s
historic
middle
school

(Lawton
Chiles
Middle
School).
 










2,800,000
 75
Lakeland FL CDBG Cypress
Youth
Sports
Complex
(Major
Sports
and
Recrea3on
Facility
established
to
meet
concurrency

requirements
of
the
City
and
State)
The
Cypress
Youth
Sports
Complex
is
designed
as
a
33
acre
community
park
designed
to
service
citywide
youth

football
 










6,064,000
 250
Lakeland FL Public
Safety Southwest
Lakeland
Area
Fire
Sta3on
(Servicing
the
Southwest
area
and
Lakeland‐Linder
Regional
Airport)
The
construc3on
of
a
new
fire
sta3on
in
the
southwest
area
of
the
City
of
Lakeland
will
service
the
growing

commercial,
industrial
and
residen3al 










2,500,000
 100
Lakeland FL Streets/Roads Waring
Road
Extension
(Western
boundary
of
City
of
Lakeland,
Florida)





This
project
will
extend
the
southerly
terminus
of
Waring
Road
south
to
W.
Pipkin
Road,
approximately
3500

feet,
or
0.66
miles.
 










5,000,000
 250
Lakeland FL Water Lake
Gibson
Southwest
Basin
Stormwater
Retrofit
(Flood
Management
and
pollu3on
control
to
waters
on

northern
and
central
areas
of
the
City
of
Lakeland,
Florida)

Lake
Gibson
is
a
489‐acre,
headwater
lake
in
the
Peace
River
Basin.
 










1,500,000
 100
Largo FL CDBG Infrastructure
Improvements
‐
Sidewalks
–
Construc3on
of
urban
trails
within
the
CDBG
target
area.
Provides

connec3vity
within
the
neighborhoods,
and
enhances
safety
condi3ons
for
kids
to
and
from
the
local
school.

 












600,000
 20
Largo FL CDBG Housing
Rehabilita3on
–
CDBG
funds
assist
in
affordable
housing
and
infrastructure
improvements
for
rental

and
owner
occupied
unit
rehabilita3on
benefi3ng
low
income
ci3zens.
10
jobs. 












500,000
 300
Largo FL Streets/Roads Mul3‐use
trail
and
sidewalk
construc3on
and
repair
‐
Facilitates
the
implementa3on
of
community

connec3vity,
a
core
objec3ve
of
the
City's
long‐term
sustainability
plan.
This
project
will
connect
schools,

neighborhoods,
parks,
civic
afrac3ons
,
etc. 










1,000,000
 20
Largo FL Streets/Roads Local
Road
Paving,
Reconstruc3on,
&
Resurfacing
–
Extends
the
service
life
of
the
City's
roadways,
improves
on

their
driving
condi3ons,
and
minimize
maintenance
needs.

Resurfacing
overlays
will
restore
surface

smoothness
and
increase
the
integrity
 










1,000,000
 25
Largo FL Streets/Roads Mast
Arm
Design
and
Installa3on
program
–
This
project
includes
replacement
of
the
concrete
poles
and
span

wire
traffic
signal
structures
with
galvanized
steel
mast
arms.
Exis3ng
structures
are
not
designed
to
withstand

FDOT
standard
of
110mph
wind
load 










1,500,000
 30
Largo FL Streets/Roads Unpaved
Road
Program
‐
Construct
roads
where
only
unpaved
roads
exist
within
the
City
right‐of‐way
(ROW).

Priori3zed
based
on
number
of
homes
serviced,
stormwater
permiqng
constraints,
and
project
cost.
 












820,000
 30
Largo FL Streets/Roads 
4th
Street
SW
Road
Reconstruc3on
‐
Re‐design
of
Fourth
Street
SW
roadway
from
Cleveland
to
8th
Ave
SW
to

include
full
brick
reconstruc3on,
drainage
improvements,
the
installa3on
of
wider
8
foot
sidewalks,
and
buffer

areas
for
landscaping.
 










2,200,000
 60
Largo FL Streets/Roads Highland
Avenue
Reconstruc3on
‐
Reconstruc3on
of
Highland
Avenue
to
include
median
landscaping
and

center
turning
lanes,
as
well
as
drainage
system
modifica3ons
to
address
roadway
wear,
standing
water
and

localized
flooding.
 










7,150,000
 90
Largo FL Water Alum
Facility
Improvements
‐
This
project
includes
design
and
construc3on
of
a
new
pollutant
removal
system

at
the
Largo
Regional
Stormwater
Treatment
Facility. 












300,000
 10
Largo FL Water Lib
Sta3on
19
Forcemain
Rehabilita3on
‐
There
has
been
frequent
breaking
of
the
force
main
concluding
that
it

has
reached
the
end
of
its
useful
life.

With
the
forcemain's

close
proximity
to
the
intracoastal
waterway,
it

needs
to
be
replaced
 














95,000
 15
Largo FL Water Downtown
Regional
Stormwater
Treatment
Pond
Rehabilita3on
‐
The
purpose
of
this
project
is
to
replace
the

underdrain
systems
of
the
Downtown
Drainage
Ponds,
which
provide
regional
stormwater
treatment
for

proper3es
located
in
the
West
Bay
Drive
Redevelopment
area 












750,000
 20
Largo FL Water Kent
Place
Ditch
Improvements
‐
The
project
consists
of
evalua3on,
acquisi3on,
redesign,
and
reconstruc3on

of
the
ditches
to
include
clearing,
regrading,
and
bank
stabiliza3on.
This
will
improve
on
their
conveyance
and

capacity. 












680,000
 20
Largo FL Water Lib
Sta3on
Upgrades,
Construc3on
‐
The
City
owns
and
operates
52
lib
sta3ons,
each
of
which
requires

periodic
preventa3ve
maintenance
and
rehabilita3on
in
order
to
maintain
class
one
reliability
and
sa3sfy

guidelines 












450,000
 20
Largo FL Water Sunset
Manor
Drainage
Improvements
‐
This
will
provide
improvements
to
the
ouzall
ditch.
The
exis3ng
ditch

banks
have
eroded
to
the
point
where
it
is
approaching
the
adjacent
property
lines.
 










1,270,000
 20
Largo FL Water Annual
Stormwater
Replacement
Program
‐
The
purpose
of
this
program
is
to
replace
deteriorated
stormwater

infrastructure.
The
project
is
comprised
of

two
components.

The
first
is
the
replacement
of
exis3ng

stormwater
pipes
and
structures
that
are
faili 










1,420,000
 30
Largo FL Water Interceptor
Manhole
Rehabilita3on
‐
This
project
consists
of
by‐pass
pumping,
cleaning,
patching
and
sealing

of
100
manholes
along
the
City's
main
interceptor
sewer
pipe.

The
scope
of
the
project
includes
the

installa3on
of
an
epoxy
based
coa3ng
 










1,650,000
 30
Largo FL Water 
Church
Creek
Phase
2
‐
The
Church
Creek
drainage
basin
is
located
in
southwest
Largo.

The
current
drainage

system
is
in
poor
condi3on
and
does
not
have
the
necessary
capacity.
This
project
replaces
the
aging

infrastructure,
improves
capacity,
etc. 










1,450,000
 40
Largo FL Water Largo
Towne
Center
Sanitary
Sewer
Infrastructure
Improvements
‐
Sanitary
sewer
infrastructure
improvements

designed
to
increase
capacity
and
meet
concurrency
requirements
with
the
Largo
Towne
Center
Development.


The
Town
Center
is
a
mixed
use
project
 












940,000
 40
Largo FL Water Margaret
Manor
Drainage
Improvements
‐
This
project
includes
installa3on
of
a
drainage
system
within
the

Margaret
Manor
subdivision
to
collect
and
convey
stormwater
to
McKay
Creek.
The
stormwater
collec3on

system
within
the
subdivision
is
inadequate 










1,425,000
 50
Largo FL Water Northwest
Sanitary
Sewer
Expansion
–
This
project
will
serve
two
primary
purposes:
allow
for
redevelopment

in
the
Clearwater‐Largo
Road
Community
Redevelopment
District,
and
reduce
wastewater
flows
to
the

Donnegan
Road
area 










2,400,000
 95
Lauderdale
Lakes FL CDBG Park
Improvements 










5,000,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
Lauderdale
Lakes FL CDBG Citywide
Sidewalk
Improvements 










1,500,000
 7
Lauderdale
Lakes FL CDBG Community
Center 








10,000,000
 80
Lauderdale
Lakes FL Public
Safety Community
Policing
Training 














75,000
 3
Lauderdale
Lakes FL Public
Safety Wireless
Computer
Technology
for
Police
Vehicles 












250,000
 4
Lauderdale
Lakes FL Public
Safety City
Emergency
Opera3on
Center 












700,000
 5
Lauderdale
Lakes FL Public
Safety 10
New
Police
Officers
to
expand

community
policing
and
to
address
crime
trends 










1,250,000
 10
Lauderdale
Lakes FL Public
Safety Police
Sta3on
Renova3on
Project 










2,000,000
 10
Lauderdale
Lakes FL Public
Safety Fire
Sta3on
Project 










4,900,000
 31
Lauderdale
Lakes FL Streets/Roads Culvert/Bridge
Improvement
Project 










1,250,000
 4
Lauderdale
Lakes FL Streets/Roads NW
36
Terrace
Roadway
Project

including
drainage
improvements
 










1,400,000
 8
Lauderdale
Lakes FL Streets/Roads Stormwater
Drainage
Improvements 










3,000,000
 14
Lauderdale
Lakes FL Streets/Roads NW
31st
Avenue
Roadway
Project
to
improve
pedestrian
safety
and
reduce
traffic
conges3on 










3,200,000
 15
Lauderdale
Lakes FL Streets/Roads NW
36th
Street
&
NW
43rd
Avenue
Roadway
Project 










2,000,000
 15
Lauderdale
Lakes FL Streets/Roads Citywide
Canal
Bank
Stabliza3on
Project 










5,000,000
 20
Lauderdale
Lakes FL Streets/Roads NW
49th
Avenue
Roadway
Project
to
improve
road/pedestrian
safety
and
reduce
traffic
conges3on 










5,000,000
 25
Lauderdale
Lakes FL Transit Mul3‐Modal
Transporta3on
Facility 








11,000,000
 50
Lauderhill FL CDBG Fire
Sta3on
73
Addi3on
&
Upgrade 












580,000
 40
Lauderhill FL CDBG Pine
Island
Road
Privacy/Security
Wall 










2,680,000
 50
Lauderhill FL CDBG Sadkin
Center
Renova3ons 












900,000
 80
Lauderhill FL CDBG John
Mullin
Park
Improvements 










1,500,000
 100
Lauderhill FL CDBG Westwind
Community
Center 










1,250,000
 100
Lauderhill FL CDBG First
City
Hall
Renova3on/Museum 










1,110,000
 125
Lauderhill FL CDBG SE
Annex
Misc.
Improvements 










4,300,000
 200
Lauderhill FL CDBG Misc.
Park
Improvements
‐
City
Wide 










2,316,000
 300
Lauderhill FL CDBG Arts
&
Cultural
Center/Library 








18,000,000
 600
Lauderhill FL Energy LED/Induc3on
Street
Ligh3ng 










1,000,000
 80
Lauderhill FL Energy Water
Reclama3on
for
Irriga3on
‐
Purple
Pipe
Program 










1,500,000
 100
Lauderhill FL Energy City
Wide
Energy
Rehab
Project 










3,000,000
 200
Lauderhill FL Energy New
City
Hall
‐
LEED
Silver 








11,000,000
 250
Lauderhill FL Streets/Roads Oakland
Park
Paver
Improvements 












300,000
 30
Lauderhill FL Streets/Roads US
441/State
Road
7
Intersec3on
Improvements 












630,000
 50
Lauderhill FL Streets/Roads 56th
Avenue
Roadway,
Drainage,
Ligh3ng,
Landscaping
and
Signaliza3on
Improvements 








11,210,000
 150
Lauderhill FL Water Reverse
Osmosis
Plant
and
Water
Conserva3on
Program 








40,000,000
 200
Miami FL Airport Runway
27
‐
Threshold
Reloca3on
(CAPACITY) 










1,500,000
 30
Miami FL Airport Sewer
Booster
PumpSta3on
(CAPACITY) 










2,600,000
 40
Miami FL Airport North
Terminal
Development
Program
‐
Regional
Commuter
Facility 








17,000,000
 46
Miami FL Airport North
Terminal
Development
Program
‐
Regional
Commuter
Facility
Covered
Walkway 








16,000,000
 60
Miami FL Airport North
Terminal
Development
Program
‐
Cc.
D‐C
400HzPower
and
Pre‐Condi3oned
Air 










7,000,000
 67
Miami FL Airport Watson
Island
Heliport
Facility 










4,000,000
 80
Miami FL Airport New
FAA
Air‐Traffic
Control
Tower
(ATCT)
(SAFETY) 










1,900,000
 86
Miami FL Airport Airport
Police
Department
K‐9
Facility
(SECURITY) 










4,500,000
 100
Miami FL Airport North
Terminal
Development
Program
‐
Cc
D
Extension
Comple3on
Work 










5,000,000
 100
Miami FL Airport North
Terminal
Development
Program
‐
Contract
746I
‐
BC
3rd
Level
Office
Remodeling 








16,000,000
 125
Miami FL Airport MIA
Perimeter
Road
Widening
and
Rerou3ng
through
NW
42nd
Court
(SECURITY) 








24,000,000
 140
Miami FL Airport Security
&
Opera3ons
Command
Center
(SECURITY) 








15,000,000
 165
Miami FL Airport TMB
‐
Runway
9R‐27L
Extension
(CAPACITY) 








13,000,000
 170
Miami FL Airport North
Terminal
Development
Program
(CAPACITY) 








61,000,000
 400
Miami FL Airport MIA
Central
Boulevard
Widening,
Realignment
and
Service
Loop
project


(CAPACITY) 








97,000,000
 715
Miami FL CDBG BMX
and
Dirt
Bike
Trails
at
Virginia
Key
Park 












100,000
 2
Miami FL CDBG Lummus
Park
Historic
Building
Restroom,
Remodel
exis3ng
historic
building
to
new
use
with
new
AC
and

electrical
systems. 












225,770
 2
Miami FL CDBG Dinner
Key
Dredging
Mi3ga3on,
Placement
of
approx
1,1000
cy
of
riprap
as
part
of
DERM
requirement
for
the

dredging
project 












332,900
 7
Miami FL CDBG Albert
Pallot
Park
Playground
and
Site
Furnishings 












500,000
 10
Miami FL CDBG North
Bayshore
Drive
Opera3onal
Improvements,
Traffic
Roundabout
and
Median
Modifica3ons 












500,000
 10
Miami FL CDBG Kennedy
Park
Restroom
Building
Improvements,
New
650
sf
restrooms‐storage
building 












776,700
 12
Miami FL CDBG New
Sewell
Park
Restroom/Office
Building 












900,000
 18
Miami FL CDBG Citywide
Emergency
Park
Generators 










1,000,000
 20
Miami FL CDBG IT
Infrastructure
Moderniza3on
 








20,000,000
 20
Miami FL CDBG New
Brickell
Park
at
South
Miami
Ave 










4,000,000
 20
Miami FL CDBG Water
Main
Life
Sciences
Environmental
Assessment 










1,000,000
 20
Miami FL CDBG Bryan
Park
New
Tennis
Center,
New:
2,000
sf
recrea3on
building,
one
addi3onal
tennis
court
and
sports

ligh3ng 










1,409,698
 25
Miami FL CDBG Robert
King
High
Park
Soccer
Field,
New
soccer
field,
restrooms
building,
parking
lot,
irriga3on,
and
bleachers
.











1,386,312
 25
Miami FL CDBG Ambrister
Park
Improvements 










1,500,000
 30
Miami FL CDBG Coral
Gate
Park
Building
Improvements,
New
4,500
sf
of:
offices,
restrooms,
community
spaces,
roofed
terrace,

parking,
landscaping
&
irrig. 










1,662,500
 30
Miami FL CDBG Duarte
Park
Building
Renova3on/Expansion,
Remodel
and
expand
exis3ng
Recrea3on
Building
to
include
mul3‐
purpose
room,
office
and
A/C
system. 










1,480,500
 30
Miami FL CDBG Grapeland
Flowrider
‐
construc3on
of
a
new
aqua3c
element
in
the
water
park 










1,500,000
 30
Miami FL CDBG Hadley
Park
Restrooms/Concession
Building,
New
4,500
sf
building
w/
restrooms,
field
office,
storage
and

concession
&
terrace
area. 










1,440,000
 30
Miami FL CDBG Miamarina
Emergency
Pier
Repairs,
Marina
Repairs
and
Restora3on 










1,675,735
 30
Miami FL CDBG Dinner
Key
Mooring
Field
Project,
Boat
Anchorage
and
Upland
Improvements 










1,773,581
 35
Miami FL CDBG Dinner
Key
Dredging,
Dredging
of
approx,
10,000
cy
for
the
main
approach
channel
at
north
end
of
marina 










1,967,100
 40
City State Program Project
Descrip3on Funding
Required Jobs
Miami FL CDBG Henderson
Park
New
Office/Restroom
Facility,
New
1,200
sf
restrooms‐office‐
storage
building
,
2,000
sf


covered
recrea3on
area 










2,097,470
 40
Miami FL CDBG Kennedy
Park
Restroom/Building
Improvements 










2,000,000
 40
Miami FL CDBG Miami
Rowing
Club
Building
Improvements/Addi3on
Parking
Lot

Improvements/Ligh3ng 










2,000,000
 40
Miami FL CDBG Moore
Park
Charrefe
and
Building
Improvements,
Remodeling:
upgrade
of
exis3ng
areas
of
the
facility
and

provide
new
instruc3onal
spaces 










2,000,000
 40
Miami FL CDBG New
Coral
Gate
Park
Building 










2,000,000
 40
Miami FL CDBG Public
Works
Opera3on
yard 










2,000,000
 40
Miami FL CDBG Roberto
Clemente
Gymnasium 










2,000,000
 40
Miami FL CDBG Simpson
Park
Environmental
and
Park
Improvements 










2,000,000
 40
Miami FL CDBG African
Square
Park
New
Bathroom
Building,
Splash
Playground
and
New
Recrea3on
Building 










2,400,000
 48
Miami FL CDBG Athalie
Range
Field
Improvements
and
Reconfigura3on 










2,676,250
 50
Miami FL CDBG MiaMarina
Pier
Improvements 










2,500,000
 50
Miami FL CDBG Williams
Park
Improvements,
Expand
building
for
offices,
mul3‐purpose
room,
storage.
Renovate
exis3ng

spaces
and
pool
building 










2,536,213
 50
Miami FL CDBG Roberto
Clemente
Park
Recrea3on
Building
Renova3on,
New:
9,000
s.f.
building
w/
offices,
mee3ng
rooms,

recrea3on
spaces,
and
child
care
area. 










2,855,446
 55
Miami FL CDBG Citywide
Parks
ADA
Compliance,
Correc3on
of
ADA
deficiencies
at
24
City
parks 










3,000,000
 60
Miami FL CDBG Dinner
Key
Marina
Dock
Master
Building 










3,000,000
 60
Miami FL CDBG James
L.
Knight
Center
Renova3on
‐
ADA
accessibility,
other
improvements 










3,000,000
 60
Miami FL CDBG Manuel
Ar3me
Fire
Alarm/Sprinkler
Improvements 










3,000,000
 60
Miami FL CDBG Shenandoah
Recrea3onal
Building
Improvements 










3,000,000
 60
Miami FL CDBG Williams
Park
Community
Center/Recrea3on
Building 










3,000,000
 60
Miami FL CDBG Robert
King
High
Park
New
Building
Construc3on,
New
5,768
sf
Community
Building
and
site
improvements:

covered
BB
court,
new
tennis
court,
ligh3ng
,
parking,
playground
&
picnic
area. 










3,619,786
 70
Miami FL CDBG North
Spring
Garden
Greenway
Improvements,
Miami
River
Greenway
Road
and
Drainage
Improvements 










4,376,710
 80
Miami FL CDBG Old
Firehouse
#
2
‐
structural
stabiliza3on
and
historic
renova3on 










5,000,000
 100
Miami FL CDBG Virginia
Key
Shoreline
Stabiliza3on
Project 










5,000,000
 100
Miami FL CDBG Buena
Vista
Heights
Street
Improvements
‐
Drainage
and
Road
Improvements 










6,112,890
 120
Miami FL CDBG Buena
Vista
Heights
Street
Improvements,
Phase
II,
Drainage
and
Road
Improvements 










6,112,890
 120
Miami FL CDBG North
Bayshore
Drive
Drainage
Improvements,
Drainage
and
Road
Improvements 










5,926,691
 120
Miami FL CDBG Caribbean
Market
Place
Building
Improvements 










7,000,000
 140
Miami FL CDBG Jackson
Health
System
Trauma
Center
 








12,000,000
 198
Miami FL CDBG Bayfront
Park
Renova3on 








10,000,000
 200
Miami FL CDBG Camillus
House
Building
Improvements 








10,000,000
 200
Miami FL CDBG New
Cur3s
Park
Aqua3c
Center 








10,000,000
 200
Miami FL CDBG New
Duarte
Park
Building
‐
construc3on
of
a
new
community
building 








10,000,000
 200
Miami FL CDBG New
Morningside
Park
Aqua3c
Center 








10,000,000
 200
Miami FL CDBG New
Virrick
Park
Aqua3c
Center 








10,000,000
 200
Miami FL CDBG Site
Improvements
for
Fern
Isle
Park
Expansion 








10,000,000
 200
Miami FL CDBG Hadley
Park
Youth
Center
&
Field
Improvements,
New:
22,000
sf
building
w/
basketball
gym,
lockers
&

restrooms,
classrooms,
storage
and
field
improv. 








11,000,000
 230
Miami FL CDBG Gibson
Park
New
Construc3on,
Demoli3on
of
exis3ng
buildings
and
construc3on
of
new
Community
Center,

Aqua3c
Center,
Sports
&
Fitness
Center,
field
resurfacing
and
new
landscaping 








20,868,105
 400
Miami FL CDBG Legion
Park
Building
&
Kayak
Launch
Improvements 








20,000,000
 400
Miami FL CDBG Virginia
Key
Beach
Museum 








20,000,000
 400
Miami FL CDBG Grove
Waterfront
Park
Construc3on 








25,000,000
 500
Miami FL CDBG New
Moore
Park
Community
Center,
Tennis
Center
and
Day
Care 








25,000,000
 550
Miami FL CDBG Municipal
Broadband
Network 








28,000,000
 560
Miami FL CDBG Citywide
Environmental
Remedia3on 








30,000,000
 600
Miami FL CDBG Citywide
Fire
Sta3on
Construc3on
&
Improvements 








30,000,000
 600
Miami FL CDBG Virginia
Key
Landfill
Environmental
Conversion 








40,000,000
 800
Miami FL CDBG Orange
Bowl
Site
Parking
Garage,
Construc3on
of
mul3‐story
parking
garages. 








94,000,000
 900
Miami FL CDBG Jackson
Health
Facili3es
Infrastructure
Improvements 








71,685,987
 1191
Miami FL CDBG Museum
Park
Construc3on 








70,000,000
 1400
Miami FL CDBG Citywide
ADA
Improvements 






100,000,000
 2000
Miami FL CDBG Jackson
Health
System
Capital
Projects 






172,000,000
 2762
Miami FL CDBG Citywide
Parking
Garages
‐
marinas,
design
district,
upper
east
side,
lifle
Havana 






200,000,000
 4000
Miami FL CDBG Jackson
Health
System
Pediatric
Ambulatory
&
Children's
Centers 






210,000,000
 4134
Miami FL Energy Fleet
upgrades
‐
purchase
of
200
hybrids
at
$22K
each 










4,400,000
 2
Miami FL Energy Green
Lab
resource
center
construc3on 










1,000,000
 17
Miami FL Energy Solar
panels
and
green
roof
installa3on
City
Hall
 










1,000,000
 20
Miami FL Energy Solid
Waste
Implementa3on
of
Single
Wastestream
and
Recycling
Program 










5,000,000
 100
Miami FL Energy Building
energy
efficiency
upgrades
‐
for
20
City
buildings 








10,000,000
 200
Miami FL Energy Citywide
Solar
Panel
Retrofit/Installa3on 








30,000,000
 600
Miami FL Schools Arbase
ES‐Two
server
room
A/C
units 












195,839
 4
Miami FL Schools Campbell
Drive
ES‐Install
surge
protec3on 














98,345
 4
Miami FL Schools Charles
R.
Drew
MS‐Replace
perimeter
fencing 












154,500
 4
Miami FL Schools Coral
Reef
ES‐Replace
the
air
cooled
chiller
for
the
media
center 














67,473
 4
Miami FL Schools Cypress
ES‐Replace
4
5‐ton
package
A/C
units
for
the
dining
area 














81,037
 4
Miami FL Schools Florida
City
ES‐Install
surge
protec3on 














92,700
 4
Miami FL Schools Glades
MS‐HVAC
and
controls‐programming
in
progress 










1,049,018
 4
Miami FL Schools Irving
&
Beatrice
Peskoe
ES‐Install
surge
protec3on 














98,345
 4
Miami FL Schools Laura
C.
Saunders
ES‐Install
surge
protec3on 














82,750
 4
Miami FL Schools Miami
Springs
SHS‐AFSS 












120,000
 4
Miami FL Schools Norwood
ES‐Storefront
doors 














59,007
 4
Miami FL Schools Palmefo
MS‐Replace
the
roof
top
chilled
water
AHU‐cafeteria 












185,400
 4
Miami FL Schools West
Miami
MS‐Provide
6
power
poles
for
the
computer
lab 














61,800
 4
City State Program Project
Descrip3on Funding
Required Jobs
Miami FL Schools William
A.
Chapman
ES‐Install
surge
protec3on 














92,700
 4
Miami FL Schools Broadmoor
ES‐A/C
for
clinic
and
main
office 












154,500
 6
Miami FL Schools Brownsville
MS‐Replace
package
unit
(6
pack
building) 












190,962
 6
Miami FL Schools Campbell
Drive
MS‐Install
surge
protec3on 












124,571
 6
Miami FL Schools Charles
R.
Hadley
ES‐Security
cameras 












327,818
 6
Miami FL Schools Dr.
Henry
W.
Mack/West
Lifle
River
ES‐Replace
condensing
unit
for
media
center 












111,240
 6
Miami FL Schools Flagami
ES‐Replace
the
obsolete
simplex
2400
clock
system 












159,135
 6
Miami FL Schools George
T.
Baker
Avia3on‐Major
paint 












381,924
 6
Miami FL Schools Hammocks
MS‐Replace/upgrade
auditorium
sea3ng 












236,357
 6
Miami FL Schools Homestead
MS‐Play
field
restora3on 












295,036
 6
Miami FL Schools Homestead
SHS‐AFSS
Home
EC.
Kitchens
1&2 












262,254
 6
Miami FL Schools Homestead
SHS‐Replace
gym
bleachers 












318,270
 6
Miami FL Schools Joe
Hall
ES‐Replace
7
VAV
boxes
and
controls
for
the
main
office 














67,531
 6
Miami FL Schools Kenwood
K‐8
Center‐Replace
5
package
A/C
units
in
Kitchen/Cafe,
replace
30‐ton
condensing
unit
for
media

building 












104,902
 6
Miami FL Schools Miami
Northwestern
SHS‐Fire
pump 














74,160
 6
Miami FL Schools Miami
Springs
SHS‐Security
cameras 












525,300
 6
Miami FL Schools Northwest
Transporta3on
Center‐Roofing 












327,818
 6
Miami FL Schools Plant
Opera3ons‐Roofing 












180,000
 6
Miami FL Schools Redland
Vehicle
Maintenance
Facility‐Major
paint 














98,345
 6
Miami FL Schools Region
Maint
Center
3‐Roofing 












540,000
 6
Miami FL Schools Region
Maint
Center
3‐Roofing
(Phase
1)
Mill
Annex 












240,000
 6
Miami FL Schools Robert
Russa
Moton
ES‐Replace
the
master
clock
system 












159,135
 6
Miami FL Schools Seminole
ES‐Major
paint 












330,000
 6
Miami FL Schools South
Miami
Heights
ES‐Play
field
restora3on 












295,036
 6
Miami FL Schools William
H.
Turner
Technical‐AFSS 












120,000
 6
Miami FL Schools Blue
Lakes
ES‐Replace
playground 












163,909
 8
Miami FL Schools Blue
Lakes
ES‐Roofing
(FDLRS) 












490,272
 8
Miami FL Schools Chris3na
M.
Eve
ES‐Major
paint 












393,382
 8
Miami FL Schools Coral
Park
ES‐Security
cameras 












362,828
 8
Miami FL Schools Dr.
Carlos
J.
Finlay
ES‐Major
paint,
interior
corridor
cracks
require
stucco
repairs 












917,891
 8
Miami FL Schools Emerson
ES‐Major
Paint 












445,578
 8
Miami FL Schools Everglades
K‐8
Center‐Replace
playground 












190,962
 8
Miami FL Schools Felix
Varela
SHS‐Major
paint‐correct
water
intrusion 










1,082,118
 8
Miami FL Schools Flagami
ES‐Major
paint 












472,714
 8
Miami FL Schools Highland
Oaks
MS‐Major
Paint 










1,020,000
 8
Miami FL Schools Key
Biscayne
Community
School‐Major
paint 












540,000
 8
Miami FL Schools Kinloch
Park
MS‐Major
paint 












803,400
 8
Miami FL Schools Lawton
Chiles‐Major
Paint 










1,174,200
 8
Miami FL Schools Lenora
Braynon
Smith
ES‐Major
paint 












491,727
 8
Miami FL Schools Major
paint 












482,040
 8
Miami FL Schools Merrick
Educa3onal
Center‐Roofing 












480,000
 8
Miami FL Schools Miami
Park
ES‐Major
paint 












472,714
 8
Miami FL Schools Miami
Springs
ES‐Water
intrusion
(rework
architectural
details
around
new
addi3on) 












393,382
 8
Miami FL Schools Norwood
ES‐Emergency
generator 














43,260
 8
Miami FL Schools Palm
Springs
MS‐Paint,
water
intrussion,
Bldg
6 










1,200,000
 8
Miami FL Schools Parkview
ES‐Major
paint 












605,640
 8
Miami FL Schools Paul
Lawrence
Dunbar
ES‐Pipe
insula3on,
DX
units 












327,818
 8
Miami FL Schools Redland
MS‐AFSS
Kitchens
1&2 












196,691
 8
Miami FL Schools Redland
MS‐Replace
gym
bleachers 












202,592
 8
Miami FL Schools Redland
MS‐Upgrade
ligh3ng
in
hallways 












202,592
 8
Miami FL Schools Regional
Center
IV‐Roofing
(Region
IV
Police) 












405,183
 8
Miami FL Schools Riverside
ES‐Major
paint 












700,194
 8
Miami FL Schools Robert
Russa
Moton
ES‐Replace
playground 












159,135
 8
Miami FL Schools Shenandoah
ES‐Major
paint 












498,284
 8
Miami FL Schools Skyway
ES‐Major
paint 












360,000
 8
Miami FL Schools Southwest
Miami
SHS‐Misc
Maintenance‐stabiliza3on 












600,000
 8
Miami FL Schools The
500
Role
Models
Academy‐Major
paint 












296,640
 8
Miami FL Schools Tropical
ES‐Replace
playgorund 












159,135
 8
Miami FL Schools Winston
Park
K‐8
Center‐Major
paint‐older
campus 












390,000
 8
Miami FL Schools Chris3na
M.
Eve
ES‐ADA
Design
Package
11 














49,999
 10
Miami FL Schools Coral
Gables
SHS‐Major
paint 










1,046,723
 10
Miami FL Schools Hammocks
MS‐HVAC
replacement
project
00459000‐design
phase
has
been
funded 










1,112,400
 10
Miami FL Schools Homestead
MS‐AFSS
kitchens
one
and
two 












131,127
 10
Miami FL Schools May
MS‐Replace/upgrade
auditorium
sea3ng 












318,270
 10
Miami FL Schools Miami
Springs
ES‐Replace
playground 












196,691
 10
Miami FL Schools Orchard
Villa
ES‐Replace
playground 












202,592
 10
Miami FL Schools South
Miami
SHS‐Major
paint‐old
building 












960,000
 10
Miami FL Schools Southwest
Transporta3on
Center‐Interior
paint
and
seal
parking
lots 












821,940
 10
Miami FL Schools Airbase
ES‐Replace
fire
alarm
system 












445,578
 12
Miami FL Schools Avocado
ES‐Replace
fire
alarm
system 












445,578
 12
Miami FL Schools Banyan
ES‐En3re
fire
alarm
system 












445,578
 12
Miami FL Schools Bel‐Aire
ES‐Replace
fire
alarm
system 












432,600
 12
Miami FL Schools Blue
Lakes
ES‐Replace
the
A/C
units
for
the
media
center
and
ESE
buildings 












590,073
 12
Miami FL Schools Campbell
Drive
MS‐Replace/upgrade
auditorium
sea3ng 












327,818
 12
Miami FL Schools Caribbean
ES‐Replace
cooling
towers 












420,000
 12
Miami FL Schools Centennial
MS‐Replace/upgrade
auditorium
sea3ng 












337,653
 12
Miami FL Schools Chapman
House‐Fire
alarm
system 












135,061
 12
City State Program Project
Descrip3on Funding
Required Jobs
Miami FL Schools Charles
R.
Drew
MS‐Kitchens
1
and
2
AFSS 












247,200
 12
Miami FL Schools Coconut
Grove
ES‐Fire
alarm
system 












472,714
 12
Miami FL Schools Comstock
ES‐Chilled
water
AHU 












394,636
 12
Miami FL Schools Comstock
ES‐Fire
alarm
system 












458,945
 12
Miami FL Schools Comstock
ES‐Upgrade
switchgear
and
electrical
panel‐cafeteria/Kitchen 












381,924
 12
Miami FL Schools Cope
Center
North‐Infrastructure
for
security
cameras 












108,049
 12
Miami FL Schools Design
&
Architecture
SHS‐Major
paint
and
A/C
ductwork 












655,636
 12
Miami FL Schools Dr.
Edward
L.
Whigham
ES‐Replace
HVAC
controls
and
insula3on 












675,305
 12
Miami FL Schools Edison
Park
ES‐Fire
alarm
system 












445,578
 12
Miami FL Schools English
Center‐Fire
alarm
system 












458,945
 12
Miami FL Schools Ethel
Koger
Beckham
ES‐ADA
Design
Package
9 














46,441
 12
Miami FL Schools Florida
City
ES‐Replace
fire
alarm
system 












432,600
 12
Miami FL Schools George
Washington
Carver
MS‐Fire
alarm
system 












472,714
 12
Miami FL Schools George
Washington
Carver
MS‐Upgrade
electrical
panel 












636,540
 12
Miami FL Schools Golden
Glades
ES‐Cooling
tower 












337,653
 12
Miami FL Schools Gra3gny
ES‐Security
cameras,
fences,
and
security
alarm 












616,298
 12
Miami FL Schools Greenglade
ES‐Replace
the
PA
system 












420,000
 12
Miami FL Schools Gulfstream
ES‐Replace
chiller,
install
A/C
in
the
kitchen
Proj.
#00417200 












432,600
 12
Miami FL Schools Henry
S.
West
Laboratory
School‐Fire
alarm
system 












458,945
 12
Miami FL Schools Highland
Oaks
MS‐Phase
2
HVAC 










1,800,000
 12
Miami FL Schools Horace
Mann
MS‐AFSS
and
Hoods
Kitchens
1&2 












393,382
 12
Miami FL Schools Irving
&
Beatrice
Peskoe
ES‐Replace
fire
alarm
system 












420,000
 12
Miami FL Schools Lake
Stevens
MS‐HVAC
Controls 












196,691
 12
Miami FL Schools Laura
C.
Saunders
ES‐Replace
fire
alarm
system 












458,945
 12
Miami FL Schools Miami
Heights
ES‐Replace
fire
alarm
system 












432,600
 12
Miami FL Schools Miami
Lakes
Educa3onal
Center‐Major
paint 










1,049,018
 12
Miami FL Schools Nau3lus
MS‐New
PA
throughout 












270,000
 12
Miami FL Schools Palm
Springs
MS‐Kitchen
A/C 












254,616
 12
Miami FL Schools Palmefo
ES‐Replace
the
PA
system 












432,000
 12
Miami FL Schools Pine
Lake
ES‐Replace
2
main
AHU,
controls
throughout
school 












393,382
 12
Miami FL Schools Region
Center
3‐Replace
chillers 












405,183
 12
Miami FL Schools Regional
Center
III‐En3re
fire
alarm
system 












445,578
 12
Miami FL Schools Rivera
MS‐Replace
the
PA
system 












420,000
 12
Miami FL Schools School
Board
Administra3on
Complex‐Fire
alarm
system,
alarm
and
PA‐Annex
Building 










1,012,958
 12
Miami FL Schools Shadowlawn
ES‐Fire
alarm
system 












458,945
 12
Miami FL Schools Shadowlawn
ES‐Upgrade
service 












445,945
 12
Miami FL Schools The
500
Role
Models
Academy‐En3re
fire
alarm
system 












445,578
 12
Miami FL Schools West
Homestead
ES‐Replace
A/C
system
in
ESE
6
Pk,
replace
main
chiller 












540,244
 12
Miami FL Schools William
A.
Chapman
ES‐Replace
fire
alarm
system 












420,000
 12
Miami FL Schools ADA
Design
Package
8 














99,815
 14
Miami FL Schools Arcola
Lakes
ES‐Cooling
tower
and
piping 












157,353
 14
Miami FL Schools Bent
Tree
ES‐ADA
Design
Package
No
8 












284,936
 14
Miami FL Schools Booker
T.
Washington
SHS‐AFSS
Kitchens
1&2,
fire
pumps 












340,931
 14
Miami FL Schools Campbell
Drive
ES‐Replace
main
chillers,
standalone
A/C
for
media
room 












675,305
 14
Miami FL Schools Citrus
Grove
ES‐Unit
ven3lators,
chilled
water
AHU,
RTUs 












784,273
 14
Miami FL Schools Frederick
Douglass
ES‐Upgrade
electrical
panel 












445,578
 14
Miami FL Schools Henry
E.S.
Reeves
ES‐Replace
chillers 












458,945
 14
Miami FL Schools Hibiscus
ES‐Electrical
infrastructure
for
cameras 












131,127
 14
Miami FL Schools John
G.
Dupuis
ES‐FA,
PA,
&
Clock,
security
alarm 












865,200
 14
Miami FL Schools Kelsey
L.
Pharr
ES‐Chill
water
AHU,
pumps 










1,255,836
 14
Miami FL Schools Kelsey
L.
Pharr
ES‐Upgrade
electrical
panel 












445,578
 14
Miami FL Schools Maya
Angelou
ES‐Cooling
towers 












549,491
 14
Miami FL Schools Miami
Gardens
ES‐FA,
PA
&
Clock 












720,000
 14
Miami FL Schools Miami
Heights
ES‐Install
surge
protec3on,
ceiling
and
light
for
60%
of
classrooms 












593,280
 14
Miami FL Schools Miami
Springs
Middle‐En3re
fire
alarm
system 












541,059
 14
Miami FL Schools Morningside
ES‐Par3al
AHU
replacement
unit
ven3lators 










1,255,836
 14
Miami FL Schools Morningside
ES‐Upgrade
electrical
panel 












445,578
 14
Miami FL Schools Natural
Bridge
ES‐Provide
parking
lot,
perimeter
fence 












137,684
 14
Miami FL Schools North
Transporta3on
Center‐Roofing 












653,014
 14
Miami FL Schools Orchard
Villa
ES‐Replace
80
ton
chiler 












337,653
 14
Miami FL Schools Palm
Springs
MS‐FA,
PA
&
Clock 












720,000
 14
Miami FL Schools Palmefo
MS‐Upgrade
the
overloaded
electrical
service,
also
to
the
labs
222
and
238
to
prevent
circuit

overload 










1,236,000
 14
Miami FL Schools Phillis
Wheatley
ES‐Upgrade
electrical
panel 












445,578
 14
Miami FL Schools Ruth
Owens
Kruse
Educa3on‐Replace
60
VAV
boxes
and
wall
thermostats 












675,305
 14
Miami FL Schools School
Board
Administra3on
Complex‐SBAB
Building‐cooling
towers,
pumps,
controls
Phase
1
of
3 










2,472,000
 14
Miami FL Schools Skyway
ES‐Chiller,
pumps,
colls 












480,000
 14
Miami FL Schools William
A.
Chapman
ES‐Replace
cooling
tower
and
main
chillers,
server
room
AC 












927,000
 14
Miami FL Schools Air
Base
ES‐ADA
Design
Package
No
8 












633,330
 16
Miami FL Schools Allapafah
MS‐Chill
water
AHU's,
controls,
VAV
(Chillers
being
replaced
in
08/09) 










3,795,000
 16
Miami FL Schools Amelia
Earhart
ES‐Roofing;
Project
#A01095
(pull
out) 










1,170,000
 16
Miami FL Schools Bent
Tree
ES‐Upgrade
the
potable
water
system‐possibly
combine
with
ADA 












675,305
 16
Miami FL Schools Central
East
Transporta3on
Center‐Resurfacing
and
drainage
for
parking
lot 










1,012,958
 16
Miami FL Schools Coral
Reef
ES‐ADA
Design
Package
No
8 












744,640
 16
Miami FL Schools Coral
Terrace
ES‐ADA
Design
Package
9 












386,273
 16
Miami FL Schools David
Fiarchild
ES‐ADA
Design
Package
11 












568,729
 16
Miami FL Schools Dr.
Gilbert
L.
Porter
ES‐HVAC
and
Controls
project
00417700‐T&B
inves3ga3on
completed 












983,454
 16
Miami FL Schools Flagami
ES‐ADA
Design
Package
12 












599,377
 16
City State Program Project
Descrip3on Funding
Required Jobs
Miami FL Schools Fulford
ES‐ADA
Design
Package
No
8 












170,056
 16
Miami FL Schools Glades
MS‐Chiller
plant
replacement‐programming
completed 










3,182,700
 16
Miami FL Schools Gloria
Floyd
ES‐HVAC
system 












393,382
 16
Miami FL Schools Jane
S.
Roberts
K‐8
Center‐Complete
HVAC
water
cooled
chiller
replacement 










1,436,000
 16
Miami FL Schools Joella
C.
Good
ES‐Electrical,
ceiling
and
ligh3ng 












891,156
 16
Miami FL Schools John
F.
Kennedy
MS‐ADA
Design
Package
11 












361,712
 16
Miami FL Schools John
G.
Dupuis
ES‐ADA
Design
Package
No
8 












238,400
 16
Miami FL Schools Kensington
Park
ES‐Unit
ven3lators
(all
except
cafe/kit
roobop
unit
whichis
being
done
in
08/09) 












950,175
 16
Miami FL Schools Lakeview
ES‐Roofing 










1,020,000
 16
Miami FL Schools Lifle
River
ES‐Repipe
school 












254,616
 16
Miami FL Schools Mari3me
&
Science
Technology
Academy‐Chill
water
AHU 










2,276,000
 16
Miami FL Schools Miami
Springs
Middle‐Replace
cooling
tower
and
chillers 












927,000
 16
Miami FL Schools North
Miami
Beach
SHS‐AHU
replacement 










1,909,620
 16
Miami FL Schools Ojus
ES‐ADA
Design
Package
9 












271,225
 16
Miami FL Schools Paul
Lawrence
Dunbar
ES‐Upgrade
electrical
panel 












445,578
 16
Miami FL Schools Phillis
Wheatley
ES‐Cooling
towers
(cafeteria),
unit
ven3lators,
water‐cooled
units 












900,000
 16
Miami FL Schools Ponce
De
Leon
MS‐Unit
ven3lators,
new
digital
controls
and
exposed
line
insula3on 










1,146,287
 16
Miami FL Schools Region
Maint
Center
4‐Roofing 












750,000
 16
Miami FL Schools Shadowlawn
ES‐Roofing 












900,000
 16
Miami FL Schools Toussaint
L'Ouverture
ES‐Roofing 










1,298,160
 16
Miami FL Schools William
H.
Turner
Technical‐Air
handler
units
(por3on
that
is
not
funded) 










1,200,000
 16
Miami FL Schools Allapafah
MS‐Roofing
Project#00343600 










1,800,000
 18
Miami FL Schools Banyan
ES‐ADA
Design
Package
11 












902,811
 18
Miami FL Schools Booker
T.
Washington
SHS‐Unit
ven3lators,
chill
water
AHU,
controls 










3,810,450
 18
Miami FL Schools Campbell
Drive
ES‐ADA
Design
Package
11 












856,077
 18
Miami FL Schools Citrus
Grove
ES‐ADA
Design
Package
8 












395,893
 18
Miami FL Schools Comstock
ES‐ADA
Design
Package
12 












987,209
 18
Miami FL Schools Coral
Gables
ES‐Repipe
school 












337,653
 18
Miami FL Schools Cutler
Ridge
MS‐Roofing 










1,700,000
 18
Miami FL Schools Dr.
Gilbert
L.
Porter
ES‐Roofing 












985,200
 18
Miami FL Schools Eneida
Massas
Hartner
ES‐ADA
Design
Package
11 












302,508
 18
Miami FL Schools Golden
Glades
ES‐ADA
Design
Package
9 












293,389
 18
Miami FL Schools Gra3gny
ES‐ADA
Design
Package
10 












892,591
 18
Miami FL Schools Henry
H.
Filer
MS‐Unit
ven3lators,
Hallway
A/C,
Electrical 










1,112,400
 18
Miami FL Schools Homestead
SHS‐Replace
AHU,
controls,
stand
alone
A/C
for
server
room 










4,951,585
 18
Miami FL Schools Horace
Mann
MS
Chill
water
AHU,
chillers,
unit
ven3lators 










2,962,000
 18
Miami FL Schools Horace
Mann
MS‐Repipe
school 












540,244
 18
Miami FL Schools Lindsey
Hopkins
Technical‐Ven3lators,
VAV
boxes,
controls,
chilled
water
AHU 










2,429,600
 18
Miami FL Schools Mae
M.
Walters
ES‐Roofing;
Project
#00340500 










1,092,644
 18
Miami FL Schools Maya
Angelou
ES‐ADA
Design
Package
No
8 












397,742
 18
Miami FL Schools Meadowlane
ES‐ADA
Design
Package
12 












982,295
 18
Miami FL Schools Miami
Lakes
MS‐Phase
2
HVAC 










1,909,620
 18
Miami FL Schools Miami
Northwestern
SHS‐ADA
Design
Package
No
6 












168,796
 18
Miami FL Schools Myrtle
Grove
ES‐Roofing 










1,227,351
 18
Miami FL Schools North
Beach
ES‐ADA
Design
Package
9 












478,184
 18
Miami FL Schools Norwood
ES‐HVAC 










1,829,616
 18
Miami FL Schools Paul
Lawrence
Dunbar
ES‐Repipe
school 












337,653
 18
Miami FL Schools Rockway
MS‐Roofing 










1,450,001
 18
Miami FL Schools School
Board
Administra3on
Complex‐Annex
building‐chilled
water
AHU,
controls 










5,728,860
 18
Miami FL Schools Shenandoah
MS‐Repipe
school 












524,509
 18
Miami FL Schools Southwest
Transporta3on
Center‐Replace
the
cooling
tower,
both
pumps,
piping
and
electrical
for
the
HVAC

(includes
all
3
trans
centers) 












445,578
 18
Miami FL Schools Sylvania
Heights
ES‐Roofing 










1,413,119
 18
Miami FL Schools W.R.
Thomas
MS‐Roofing 












775,200
 18
Miami FL Schools William
H.
Turner
Technical‐Roofing 












738,000
 18
Miami FL Schools Claude
Pepper
ES‐ADA
Design
Package
9 












531,060
 20
Miami FL Schools Coconut
Grove
ES‐ADA
Design
Package
11 












785,335
 20
Miami FL Schools Cypress
ES‐ADA
Design
Package
10 












859,460
 20
Miami FL Schools Emerson
ES‐ADA
Design
Package
12 












794,848
 20
Miami FL Schools George
Washington
Carver
ES‐ADA
Design
Package
No
8 












613,487
 20
Miami FL Schools Palm
Springs
MS‐Window
replacement 










1,370,962
 20
Miami FL Schools South
Pointe
ES‐ADA
Design
Package
12 












838,824
 20
Miami FL Schools Springview
ES‐ADA
Design
Package
11 










1,057,903
 20
Miami FL Schools ADA
Design
Package
10 










1,034,971
 22
Miami FL Schools James
H.
Bright
ES‐ADA
Deaign
Package
9
Includes
J.W.
Johnson
ES) 










1,065,056
 22
Miami FL Schools North
Glade
ES‐ADA
Design
Package
11 












287,760
 22
Miami FL Schools Rockway
ES‐ADA
Design
Package
12 










1,062,660
 22
Miami FL Schools Thomas
Jefferson
MS‐HVAC 










2,661,800
 22
Miami FL Schools Westview
MS‐ADA
Design
Package
No
8 












107,880
 22
Miami FL Schools ADA
Design
Package
12 










1,184,367
 24
Miami FL Schools Avocado
ES‐ADA
Design
Package
No
8 










2,005,604
 24
Miami FL Schools Ben
Sheppard
ES‐ADA
Design
Package
8 










2,344,160
 24
Miami FL Schools Benjamin
Franklin
ES‐Window
replacement 










3,182,700
 24
Miami FL Schools Calusa
ES‐ADA
Design
Package
12 










1,549,076
 24
Miami FL Schools Dr.
Bowman
Foster
Ashe
ES‐ADA
Design
Package
10 










1,381,094
 24
Miami FL Schools Henry
H.
Filer
MS‐Window
replacement 










1,829,616
 24
Miami FL Schools Hialeah
SHS‐Window
replacement 










2,825,382
 24
Miami FL Schools Joella
C.
Good
ES‐ADA
Design
Package
11 










1,467,423
 24
City State Program Project
Descrip3on Funding
Required Jobs
Miami FL Schools Lake
Stevens
ES‐ADA
Design
Package
10 












705,468
 24
Miami FL Schools Lorah
Park
ES‐ADA
Design
Package
10 










1,899,908
 24
Miami FL Schools Madie
Ives
Community
ES‐ADA
Design
Package
11 










1,320,202
 24
Miami FL Schools Miami
Springs
ES‐ADA
Design
Package
No
8 










1,423,126
 24
Miami FL Schools Oak
Grove
ES‐Window
replacement 










1,829,616
 24
Miami FL Schools Parkview
ES‐Window
replacement 










1,822,254
 24
Miami FL Schools Gra3gny
ES‐Design
window
replacement,
ceiling
and
ligh3ng,
construc3on
11/12,
EMS
and
VAV 










2,695,578
 26
Miami FL Schools Lenora
Braynon
Smith
ES‐ADA
Design
Package
10 










1,584,857
 26
Miami FL Schools Liberty
City
ES‐Window
replacement
(FCI
school) 










3,376,526
 26
Miami FL Schools Miami
Springs
Middle‐Windows
and
door
replacement
(Buildings
5&6
FCI) 










5,728,860
 28
Miami FL Schools Miami
Sunset
SHS‐ADA
Design
Package
No
8 










3,239,982
 28
Miami FL Schools Miami
Shores
ES‐Roof,
fire
alarm,
electrical,
ADA,
elevator,
windows,
structural
repaisrs,
major
paint,
sewer

connec3on 










9,904,170
 36
Miami FL Streets/Roads Citywide
Traffic
Circles
D2,
D3
and
D5,
Traffic
Calming
Measures 












100,000
 2
Miami FL Streets/Roads NW
58
Street
Improvements
(Miscellaneous
Street
Paving),
Road
Improvements 












174,027
 2
Miami FL Streets/Roads Belle
Meade
‐
FPL
Duct
Bank
Supplemental,
Electrical
Supply
to
Belle
Meade
Pump
Sta3on 












247,000
 5
Miami FL Streets/Roads Buena
Vista
East
Historic
Dist.
Streetscape,
Drainage
and
Road
Improvements 












240,000
 5
Miami FL Streets/Roads Calle
Ocho
Landscaping
Project,
Landscaping/Beau3fica3on 












302,500
 5
Miami FL Streets/Roads DKM
Emergency
Repairs
Pier
#3
&
#5,
Marina
Repairs
and
Restora3on 












200,000
 5
Miami FL Streets/Roads NW
24th
St
from
12th
to
13th
Ave
Streetscape,
Drainage
and
Road
Improvements 












251,000
 5
Miami FL Streets/Roads 16th
St.
from
27
to
28
Ave.,
Drainage
and
Road
Improvements 












450,000
 10
Miami FL Streets/Roads 18th
St
from
30
to
32
Ave.,
Drainage
and
Road
Improvements 












450,000
 10
Miami FL Streets/Roads Flagami
Traffic
Calming
(including
East
Lifle
Havana),
Traffic
Calming
Measures 












700,000
 10
Miami FL Streets/Roads Miami
River
Greenway
‐
NW
5th
Street
Bridge
Approach,
Miami
River
Greenway
Road
and
Drainage

Improvements 












844,000
 10
Miami FL Streets/Roads North
Bayshore
Drive
Opera3onal
Improvements,
Traffic
Roundabout
and
Median
Modifica3ons 












500,000
 10
Miami FL Streets/Roads NW
16th
Street
and
16th
Terrace
Streetscape,
Drainage
and
Road
Improvements 












450,000
 10
Miami FL Streets/Roads NW
18th
Street
Streetscape,
Drainage
and
Road
Improvements 












450,000
 10
Miami FL Streets/Roads Silver
Bluff
Traffic
calming
Priority
3,
Traffic
Calming
Measures 












600,000
 10
Miami FL Streets/Roads Storm
Drainage
Master
Plan
Update 












650,000
 10
Miami FL Streets/Roads Miami
River
Greenway
‐
NW
5th
Street
Extension,
Miami
River
Greenway
Road
and
Drainage
Improvements 












844,000
 12
Miami FL Streets/Roads Miami
River
Greenway
SE
5th
Street
Extension,
Miami
River
Greenway
Road
and
Drainage
Improvements 












844,000
 12
Miami FL Streets/Roads Durham
Terrace
Drainage
Improvements,
Drainage
and
Road
Improvements 










1,000,000
 20
Miami FL Streets/Roads Miami
River
Greenway
‐
Miami
Circle
Greenway,
Miami
River
Greenway
Improvements 










1,320,000
 20
Miami FL Streets/Roads Shenandoah
Traffic
Calming
Priority
4,
Traffic
Calming
Measures 










1,050,000
 20
Miami FL Streets/Roads Traffic
Calming
‐
Grove
area 












728,500
 20
Miami FL Streets/Roads Shenandoah
Traffic
Calming
Phase
2,
Traffic
Calming
Measures 










1,213,000
 25
Miami FL Streets/Roads Citywide
GIS
archival
registra3on
of
as‐built
documents

 










1,500,000
 30
Miami FL Streets/Roads Citywide
Traffic
Study,
Evalua3on
of
Traffic
Calming
Measures 










1,584,000
 30
Miami FL Streets/Roads Dinner
Key
Mooring,
Boat
Anchorage
and
Upland
Improvements 










1,773,581
 30
Miami FL Streets/Roads Miami
River
Greenway
2nd
Ave
/
Miami
Ave
Riverwalk
Extension,
Miami
River
Greenway
Road
and
Drainage

Improvements 










1,483,900
 30
Miami FL Streets/Roads NW
2nd
Avenue
Road
Improvements,
Drainage
and
Road
Improvements 










1,450,000
 30
Miami FL Streets/Roads NW
82nd
Street
Traffic
Calming 










1,500,000
 30
Miami FL Streets/Roads SW
10th
Street
Drainage
Improvements,
Drainage
and
Road
Improvements 










1,848,000
 35
Miami FL Streets/Roads Brickell
Key
Bridge,
Ridge
Restora3on 










2,000,000
 40
Miami FL Streets/Roads Coral
Way
Roadway
Improvements
PH
II 










2,000,000
 40
Miami FL Streets/Roads Intelligent
Transporta3on
System
(ITS)
Devices
on
Bridges
over
the
Miami
River 










2,000,000
 40
Miami FL Streets/Roads Northwest
14th
Street
Streetscape
Improvements,
Drainage
and
Road
Improvements 










2,232,000
 40
Miami FL Streets/Roads Bird
Avenue
Road
Improvements,
Drainage
and
Road
Improvements 










2,541,000
 50
Miami FL Streets/Roads Citywide
Traffic
Control
Measures,
Citywide
Traffic
Calming
Measures 










2,640,000
 50
Miami FL Streets/Roads Coral
Gate
Wall,
Design
&
Construc3on
of
a
12
foot
concrete
wall 










2,500,000
 50
Miami FL Streets/Roads City‐wide
Sidewalk
and
ADA
Ramp
installa3on
and
repair 










3,000,000
 60
Miami FL Streets/Roads Citywide
Storm
Sewer
Drainage
Inlet
Retrofit
‐
retrofit
all
drainage
inlets
with
barrier
screens
to
keep
trash
out

of
drainage
system 










3,000,000
 60
Miami FL Streets/Roads Miami
River
Greenway
NW
5th
Street
Bridge
Extension,
Miami
River
Greenway
Road
and
Drainage

Improvements 










2,077,280
 60
Miami FL Streets/Roads Miami
River
Greenway
‐
East
Lifle
Havana
,
Miami
River
Greenway
Road
and
Drainage
Improvements 










3,808,200
 70
Miami FL Streets/Roads City‐wide
Roadway
Resurfacing/Repair
and
Swale
Improvement,
Road
Improvements 










4,000,000
 80
Miami FL Streets/Roads Garden
Storm
Sewer,
Drainage
and
Road
Improvements 










4,110,000
 80
Miami FL Streets/Roads N.
Spring
Garden
Greenway
Improvements,
Miami
River
Greenway
Road
and
Drainage
Improvements 










4,130,710
 80
Miami FL Streets/Roads Auburn
Storm
Sewer
Drainage
and
Road
Improvements 










5,320,000
 100
Miami FL Streets/Roads Brickell
Area
Roadway
and
Street
Improvements 










5,000,000
 100
Miami FL Streets/Roads City‐wide
Bridge
Repair,
Bridge
Repair
and
Restora3on 










5,000,000
 100
Miami FL Streets/Roads North
14th
Street
Mul3media
Entertainment
District,
Drainage
and
Road
Improvements 










5,064,740
 100
Miami FL Streets/Roads Palm
Grove
Road
Improvements,
Drainage
and
Road
Improvements 










5,280,000
 100
Miami FL Streets/Roads Overtown
Greenway
@
NW
11
Terrace,
Overtown
Greenway
Segment
Improvements 










5,500,000
 110
Miami FL Streets/Roads Buena
Vista
Heights
Street
Improvements,
Phase
II,
Drainage
and
Road
Improvements 










6,112,890
 120
Miami FL Streets/Roads North
Bayshore
Drive
Drainage
Improvements,
Drainage
and
Road
Improvements 










5,926,691
 120
Miami FL Streets/Roads Omni
U3tlity
Improvements 










6,921,000
 138
Miami FL Streets/Roads Citywide
Bicycle
Facili3es 










8,000,000
 160
Miami FL Streets/Roads Miami
Baywalk 










8,000,000
 160
Miami FL Streets/Roads South
Bayshore
Drive
Drive
Roadway
Improvements,
Drainage
and
Road
Improvements 










8,000,000
 160
Miami FL Streets/Roads Citywide
Traffic
Calming 








10,000,000
 200
Miami FL Streets/Roads NW
14th
Terr.
Streetscape,
Drainage
and
Road
Improvements 










9,500,000
 200
Miami FL Streets/Roads Citywide
slab
cover
trenches
cleaning
 








12,000,000
 240
City State Program Project
Descrip3on Funding
Required Jobs
Miami FL Streets/Roads SE
Overtown/Park
West
Area
wide
Roadway
and
U3lity
Improvements 








12,000,000
 240
Miami FL Streets/Roads Citywide
Bridge
Repair/Rehab 








13,000,000
 260
Miami FL Streets/Roads Miami
River
Greenway
Extension
(west
of
NW
12th
Avenue) 








15,000,000
 300
Miami FL Streets/Roads Health
District
Streetscape
&
Roadway
Improvements 








20,000,000
 400
Miami FL Streets/Roads Overtown
Greenway
Phase
2

 








20,000,000
 400
Miami FL Streets/Roads Health
District
Roadway
Improvements
and
Streetscapes 








25,000,000
 500
Miami FL Streets/Roads Downtown
Infrastructure
and
Beau3fica3on
‐
install
ligh3ng,
replace
sidewalk,
add
ADA,
repave,
landscaping 








30,000,000
 600
Miami FL Streets/Roads Overtown
Greenway
Phase
II 








30,000,000
 600
Miami FL Streets/Roads Citywide
Storm
Sewer
System
De‐sil3ng
‐
remove
granular
material
from
manholes,
inlets,
cross‐drains,
French

drains
and
slab‐covered
trenches. 








45,000,000
 900
Miami FL Streets/Roads Citywide
Drainage
Improvements 








50,000,000
 1000
Miami FL Streets/Roads Coconut
Grove
Roadway
Improvements
(Master
Plan),
Drainage
and
Road
Improvements 








50,000,000
 1000
Miami FL Streets/Roads Port
of
Miami
Tunnel 






100,000,000
 2000
Miami FL Streets/Roads Citywide
Street
Resurfacing
‐
mill
and
resurface
all
City
streets 






175,000,000
 3500
Miami FL Transit Overtown/Park
West
Trolley 












500,000
 5
Miami FL Transit Brickell
Trolley
‐
Rubberized 












800,000
 12
Miami FL Transit Downtown/Midtown
Trolley 










1,500,000
 23
Miami FL Transit Miami
Streetcar 






280,000,000
 560
Miami FL Transit Metromover
Brickell
Loop
Extension 








80,000,000
 600
Miami FL Transit Metromover
Extension
to
Marlins
Stadium 






150,000,000
 3000
Miami FL Transit South
Florida
East
Coast
Corridor
(SFECC)
Transit
Extension 






300,000,000
 6000
Miami FL Water Albert
Pallot
Park
Shoreline
Stabiliza3on 










1,200,000
 24
Miami FL Water Dinner
Key
Dredging
Mi3ga3on,
Maintenance
Dredging
and
Environmental
Mi3ga3on 










2,300,000
 40
Miami FL Water Fern
Isle
Waterway
Cleaning 










2,000,000
 40
Miami FL Water Ademar
and
Davis
Canal
Dredging
Project 










3,927,400
 79
Miami FL Water City
wide
storm
inlets
survey
data
collec3on 










5,000,000
 100
Miami FL Water Wagner
Creek
sta3onary
trash
screen
 










5,000,000
 100
Miami FL Water City
wide
storm
water
ouzalls
retrofiqng 








12,000,000
 240
Miami FL Water Storm
water
pump
sta3ons
rehabilita3on 








12,000,000
 240
Miami FL Water Wagner
Creek
Seybold
Canal
Environmental
Cleanup
and
Dredging 








17,000,000
 350
Miami FL Water Citywide
Canal
Maintenance
Dredging 








30,000,000
 600
Miami FL Water Bicentennial
Park
Sewer
&
Water
Treatment
Plant
Reloca3on 






100,000,000
 2000
Miami
Beach FL CDBG Seawalls
‐
This
project
would
qualify
for
the
EPA's
Nonpoint
Grant
Program.
No
EPA
type
category,
so
placed
in

CDBG. 










4,800,228
 116
Miami
Beach FL Streets/Roads Bridge
Repair 










1,425,000
 29
Miami
Beach FL Streets/Roads Citywide
Street
Resurfacing 










1,947,000
 39
Miami
Beach FL Transit Sunset
Harbor
Parking
Garage 








22,892,000
 458
Miami
Beach FL Water Sanitary
Sewer
Manhole
Rehab 










1,000,000

Miami
Beach FL Water North
Shore
Neighborhood
Improvements 












147,000
 3
Miami
Beach FL Water West
Avenue/Bay
Road
Infrastructure 












147,000
 3
Miami
Beach FL Water Oceanfront
Neighborhood
Improvements 












896,066
 18
Miami
Beach FL Water Collins
Avenue
Main 










1,400,000
 28
Miami
Beach FL Water Sunset
&
Vene3an
Island
Force
Mains 










2,500,000
 50
Miami
Beach FL Water Nau3lus,
Normandy
Shores
and
Normandy
Isle
Neighborhood
Infrastructure 










4,189,919
 84
Miami
Beach FL Water Sunset,
Vene3an,
Palm,
Star
&
Hibiscus
Island
Improvements 










5,204,928
 104
Miami
Beach FL Water La
Gorce
Neighborhood
Improvements 










5,918,054
 118
Miami
Beach FL Water Biscayne
Point
Neighborhood
Improvements 










9,738,840
 195
Miami
Beach FL Water South
Pointe
Pump
Sta3on 








18,603,498
 372
Miami
Beach FL Water Bayshore
Neighborhood
Right
Of
Way
Infrastructure
 








29,950,577
 599
Miami
Beach FL Water Flamingo
Neighborhood
Right
Of
Way
Infrastructure 








45,788,888
 916
Miami‐Dade FL Airport Runway
27
Threshold
Reloca3on
at
Miami
Interna3onal
Airport 










1,500,000
 30
Miami‐Dade FL Airport Airport‐
Miami
Interna3onal
Airport
(MIA)
‐
Construc3on
of
double
bofom
Fuel
Tanks
for
safety
 










6,000,000
 40
Miami‐Dade FL Airport Construct
New
FAA
Air‐Traffic
Control
Tower
(ATCT)
at
Opa‐locka
Execu3ve
Airport. 










1,900,000
 80
Miami‐Dade FL Airport Airport‐
Kendall‐Tamiami
Execu3ve
Airport
(TMB)
Capacity
Project
‐
Construct
runway
9R‐27L
extension 








13,000,000
 120
Miami‐Dade FL Airport Construct
Security
&
Opera3ons
Command
Center
at
Miami
Interna3onal
Airport 








15,000,000
 160
Miami‐Dade FL Airport North
Terminal
Development
Program
at
MIA. 








61,000,000
 300
Miami‐Dade FL CDBG Port
of
Miami‐Roadway
improvements
and
poten3al
con3ngency
costs
related
to
the
Seaport
Tunnel 








43,500,000
 0
Miami‐Dade FL CDBG Electrical
service
installa3on
at
Larchmount
Park 












250,000
 2
Miami‐Dade FL CDBG Sewer
connec3on
improvements
at
Blue
Lakes
Park 












160,000
 2
Miami‐Dade FL CDBG Sewer
connec3on
improvements
at
Ron
Ehman
Park 












260,000
 2
Miami‐Dade FL CDBG Cruise
Terminal
D
New
Canopies
(Intermodal)
at
Port. 












828,000
 3
Miami‐Dade FL CDBG Cruise
Terminal
D
New
Canopies
(Parking
Garage)
at
Port. 












754,200
 3
Miami‐Dade FL CDBG Port
of
Miami‐Install3on
and
construc3on
of
new
canopies
at
the
cargo
gates 












526,000
 3
Miami‐Dade FL CDBG Replace
exis3ng
CCTV
Video
Recording
System
and
improvements
to
Records
Room
equipment 












500,000
 3
Miami‐Dade FL CDBG Drainage
improvements
at
Gwen
Cherry
Park 












680,000
 4
Miami‐Dade FL CDBG Construct
Home
Chemical
Collec3on
Center
for
secure
disposal
of
hazardous
chemicals 












510,000
 5
Miami‐Dade FL CDBG Sewer
connec3on
improvements
at
Gwen
Cherry
Park 












800,000
 5
Miami‐Dade FL CDBG Provide
electrical
backup
system
improvements
to
the
County's
radio
system 












120,000
 7
Miami‐Dade FL CDBG Seawall
repair
and
improvements
at
Crandon
Park 










1,475,000
 8
Miami‐Dade FL CDBG Expand
exis3ng
parking
lot
at
the
North
Dade
Jus3ce
Center 










1,000,000
 10
Miami‐Dade FL CDBG Facility
improvements
and
repairs
at
various
Public
Safety
facili3es
 










1,780,000
 10
Miami‐Dade FL CDBG Port
of
Miami‐Construc3on
of
Cargo
Yard
Warehouse
CIPS 










1,900,000
 10
Miami‐Dade FL CDBG Port
of
Miami‐Cruise
Terminal
B
&
C
Security
Upgrades 










1,800,000
 10
Miami‐Dade FL CDBG Port
of
Miami‐Improvements
to
Command
&
Control
building
including
migra3on
of
IT,
CBP
Reloca3on
and
 










4,900,000
 10
Miami‐Dade FL CDBG Drainage
improvements
in
the
area
of
West
Goulds
located
in
the
Goulds
Neighborhood
Revitaliza3on
Strategy

Area 












880,000
 13
Miami‐Dade FL CDBG Provide
shufers
and
impact
windows
for
the
Regional
Dade
Processing
Center 












600,000
 14
City State Program Project
Descrip3on Funding
Required Jobs
Miami‐Dade FL CDBG Port
of
Miami‐Design,
Planning,
and
Environmental
Improvements
for
Dredge
III 






156,000,000
 15
Miami‐Dade FL CDBG Port
of
Miami‐Surface
parking
improvements
at
Terminal
C 












928,000
 17
Miami‐Dade FL CDBG Construct
evidence
storage
facility
and
parking
area 










3,000,000
 20
Miami‐Dade FL CDBG Port
of
Miami‐Design
Bulkhead
rehabilita3on
Wharf
165‐177 










3,500,000
 20
Miami‐Dade FL CDBG Port
of
Miami‐Design
for
Dredge
III
Buckhead
strengthening 










4,000,000
 20
Miami‐Dade FL CDBG Port
of
Miami‐Dolphin
Mooring
Exen3on 










1,900,000
 20
Miami‐Dade FL CDBG Repair
terra
cofa
facade
and
replace
windows
at
the
Dade
County
Courthouse 








28,000,000
 20
Miami‐Dade FL CDBG Replace
domes3c
and
sanitary
risers
at
Dade
County
Courthouse 










3,000,000
 20
Miami‐Dade FL CDBG Replace
electrical
riser
at
Dade
County
Courthouse 










4,000,000
 20
Miami‐Dade FL CDBG Replace
exterior
pavers
and
repair
sidewalks
at
the
Stephen
P.
Clark
Government
Center 










3,000,000
 20
Miami‐Dade FL CDBG Replacement
Manatee
Gate
for
Canal
#2
at
Miami
Interna3onal
Airport 












300,000
 20
Miami‐Dade FL CDBG Construct
bed
radiology
recovery
unit
at
Jackson 










9,500,000
 25
Miami‐Dade FL CDBG Establish
Credit
Facility
for
Small
Business
Support
 








53,500,000
 25
Miami‐Dade FL CDBG Implement
local
capital
projects
for
disastor
mi3ga3on
strategy
and
climate
change
adapta3on 










6,000,000
 25
Miami‐Dade FL CDBG Repair
and
replace
shelters
and
other
park
facili3es
at
regional
and
local
parks 








15,000,000
 25
Miami‐Dade FL CDBG Develop
exis3ng
site
and
construct
new
regional
Arcola
Head
Start
Center 










9,000,000
 35
Miami‐Dade FL CDBG Build‐out
exis3ng
shell
space
and
provide
infrastructure
equipement
for
emergency
management
func3ons 








29,388,000
 40
Miami‐Dade FL CDBG Construc3on
Sewer
Booster
Pump
sta3on
at
Miami
Interna3onal
Airport 










2,600,000
 40
Miami‐Dade FL CDBG Drainage
improvements
at
J.G.
Head's
subdivision
in
Central
Miami‐Dade 










3,300,000
 40
Miami‐Dade FL CDBG Implement
job
retraining
program
to
s3mulate
and
address
two‐year
job
loss
from
construc3on
industry 








16,875,000
 40
Miami‐Dade FL CDBG Improve
Jackson
North
Medical
Center
including
construc3on
and
equipment
upgrades 










9,004,000
 45
Miami‐Dade FL CDBG Port
of
Miami‐Gantry
Crane
Electrifica3on
and
upgrades 










5,847,596
 45
Miami‐Dade FL CDBG Demolish
and
construct
new
regional
Wynwood
Neighborhood
Service
Center 








15,000,000
 50
Miami‐Dade FL CDBG Animal
Services
‐
construct
new
shelter
to
replace
defunct
facility 








25,000,000
 75
Miami‐Dade FL CDBG Construc3on
of
a
K‐9
Facility
at
Miami
Interna3onal
Airport 










4,500,000
 90
Miami‐Dade FL CDBG Port
of
Miami‐Seaboard
Marine
Improvements
Phase
II
&
III 








10,000,000
 100
Miami‐Dade FL CDBG Port
of
Miami‐Repair
FEC
Rail
Road
bbascular
bridge 










3,837,397
 144
Miami‐Dade FL CDBG Design
and
construct
new
pediatric
tower
at
Holtz
Children's
Hospital 








44,000,000
 150
Miami‐Dade FL CDBG Construct
Krome
Deten3on
Center
jail
facility
with
system‐wide
central
support
facility 






352,000,000
 275
Miami‐Dade FL CDBG Port
of
Miami‐Repair
vehicular
bascular
bridge 










7,566,735
 284
Miami‐Dade FL CDBG Port
of
Miami‐Bulkhead
2
and
3
Rehabilita3on
Improvements
 








15,145,313
 288
Miami‐Dade FL CDBG Port
of
Miami‐Cruise
Terminal
B&C
New
Passenger
Boarding
Bridges 










3,900,000
 375
Miami‐Dade FL CDBG Port
of
Miami‐Cruise
Terminal
D&E
New
Passenger
Boarding
Bridges 










3,900,000
 375
Miami‐Dade FL CDBG Port
of
Miami‐Cruise
Terminal
J
Remodeling 










5,780,000
 380
Miami‐Dade FL Energy General
Services
Administra3on
‐
911
Answerpoint
(Replace
cooling
tower
and
fibeen
air
handlers) 










5,000,000
 5
Miami‐Dade FL Energy General
Services
Administra3on
‐
Medical
Examiner's
Building
Mi3ga3on
Hardening
(Provide
shufers
and

energy
efficient
impact
windows
for
the
Medical
Examiner’s
building) 










2,000,000
 5
Miami‐Dade FL Energy General
Services
Administra3on
‐
Provide
monitoring
of
power
systems
for
the
Regional
Data
Processing
and

Communica3ons,
911,
Fire
and
Police
Dispatch
building 












300,000
 5
Miami‐Dade FL Energy General
Services
Administra3on‐
Miami‐Dade
County
Facili3es
Smart‐Meter
Retrofit
(Energy
Management

Submetering
Project;
Installa3on
of
meters
to
measure
energy
use
in
cri3cal
County
buildings
in
real
3me

enabling
energy
analy3cal
and
cost
reduc3on 










1,500,000
 7
Miami‐Dade FL Energy General
Services
Administra3on‐
Water
Efficiency
Retrofit
Program 










1,500,000
 7
Miami‐Dade FL Energy General
Services
Administra3on
‐
Elec3ons
Headquarters/311
Building
Hardening
(Provide
shufers
and
energy

efficient
impact
windows
for
the
Elec3ons
Headquarters
/
311
Answer
Center.

Improve
grounding
and

reinforce
roof) 










2,000,000
 10
Miami‐Dade FL Energy General
Services
Administra3on
‐
GSA
Integrated
Command
Center
Monitoring
System
(Provide
monitoring
of

power
systems
for
the
Integrated
Command
Center) 












300,000
 10
Miami‐Dade FL Energy Office
of
Sustainability‐
Implementa3on
of
a
training
program
for
contractors
focused
on
energy
efficiency
and

renewable
energy
systems;
to
complement
efforts
to
improve
residen3al
and
commercial
accessibility
(cost

and
supply
of
goods
and
services)
 












200,000
 10
Miami‐Dade FL Energy Public
Housing
‐
Ward
Towers
Window
Replacement
(Ward
Towers
window
replacement
with
impact
resistant,

energy
efficient
windows
for
the
exis3ng
high
rise
building) 










2,500,000
 10
Miami‐Dade FL Energy Solid
Waste
Management
‐
South
Dade
Cell
4
Gas
Extrac3on
and
Odor
Control
(Install
methane
gas
extrac3on

system
for
reuse) 










1,500,000
 10
Miami‐Dade FL Energy General
Service
Administra3on
(GSA)
Children’s
Courthouse
Cool
/
Green
Roof
installa3on. 












100,000
 15
Miami‐Dade FL Energy Water
and
Sewer
‐
Installa3on
of
two
biogas
fueled
cogenera3on
units
at
the
SDWWTP.

These
units
will
allow

the
Department
to
fully
u3lize
biogas
generated
at
the
plant
from
the
diges3on
of
bio‐solids
and
from
the

adjacent
South
Dade 










4,800,000
 15
Miami‐Dade FL Energy General
Services
Administra3on
‐
BMS
Controls
at
three
County
Sites
(Replace
obsolete
building
controls
at

three
county
sites) 










8,000,000
 20
Miami‐Dade FL Energy General
Services
Administra3on
‐
Coral
Gables
Courthouse
(Green
Roof
replacement) 












410,000
 20
Miami‐Dade FL Energy Public
Housing
‐
Modello
Family
Development
Comprehensive
Moderniza3on
(Comprehensive
moderniza3on

including
energy
efficiency
improvements
for
120
public
housing
units) 










2,600,000
 20
Miami‐Dade FL Energy Seaport
‐
Solar
power
installa3on
on
SeaPort
Terminal
Roof
(500
KW) 










2,500,000
 20
Miami‐Dade FL Energy General
Services
Administra3on
‐
Solar
Power
for
the
Integrated
Command
Center
(Solar
power
installa3on
on

roof
of
GSA
Integrated
Command
Center
including
energy
efficient/Cat
V
roof
Replacement) 










7,500,000
 24
Miami‐Dade FL Energy General
Services
Administra3on
‐
North
Dade
Jus3ce
Center
(Green
Roof
replacement) 












800,000
 25
Miami‐Dade FL Energy Office
of
Sustainability
‐
Pilot
installa3on
of
solar
thermal
renewable
energy
systems
at
1000
homes
including

feasibility
analysis
of
financing
strategy
and
billing
infrastructure
system
to
enable
larger‐scale
implementa3on.











7,500,000
 25
Miami‐Dade FL Energy Avia3on
Department
‐
Airport
Solar
Installa3on
(Solar
power
installa3on
at
Airport
on
por3on
of
terminal
roof

(1MW)) 










4,000,000
 30
Miami‐Dade FL Energy General
Services
Administra3on
‐
Cultural
Center
Plaza
(Replace
Cultural
Center
Plaza
pedestrian
roof
to

mi3gate
structural
decay
and
water
leaks
including
"cool
roof"
energy
improvements.) 










8,000,000
 40
Miami‐Dade FL Energy General
Services
Administra3on
‐
Dade
County
Courthouse
(Replace
outdated
air
condi3oning
system
with

new
energy
efficient
system
to
reduce
cooling
load
and
energy
consump3on) 










5,000,000
 40
Miami‐Dade FL Energy General
Services
Administra3on‐
Cogenera3on
Plant
for
Downtown
Government
Center
Buildings 








15,000,000
 75
City State Program Project
Descrip3on Funding
Required Jobs
Miami‐Dade FL Energy Public
Housing
‐
Roof
Replacements
(Green
Roof
replacement
throughout
MDHA
housing
projects
including

solar
applica3ons
where
feasible) 








15,000,000
 75
Miami‐Dade FL Energy Public
Health
Trust
‐
Jackson
Hospital
Miscellaneous
Construc3on
Projects
(Construct
renewal
and
replacement

projects
throughout
the
system
including
green/energy
efficient
projects
such
as
cool
roofs
and
more
efficient

building
management
systems
to
red 






122,000,000
 100
Miami‐Dade FL Energy General
Services
Administra3on‐
Capacity
Expansion
of
Thermal
Storage
District
Cooling
Loop
(Improve
Chilled

Water
Loop;
Expand
produc3on
and
distribu3on
capacity
of
GSA
thermal
storage
(ice)
district
cooling
loop
to

reduce
facility
energy
consump3on 








25,000,000
 125
Miami‐Dade FL Housing Elevator
repairs
of
Public
Housing
Authority
high
rise
buildings
and
UFAS
compliance. 










9,400,000
 5
Miami‐Dade FL Housing Concrete
structural
repairs
to
high
rise
buildings
for
elderly
residents. 








12,000,000
 20
Miami‐Dade FL Housing Parking
lot
improvements
and
upgrades
at
105
sites
for
Uniform
Federal
Accessibility
Standards
compliance. 










9,654,600
 45
Miami‐Dade FL Housing Exterior
pain3ng
of
105
public
housing
developments. 










9,296,100
 50
Miami‐Dade FL Housing Uniform
Federal
Accessibility
Standards
improvements
to
managers’
offices,
dining
rooms,
community
centers

in
Miami‐Dade
Housing
Agency 








25,000,000
 50
Miami‐Dade FL Housing Uniform
Federal
Accessibility
Standards
improvements
to
unit
interiors
of
public
housing
units
(over
105
sites).









30,000,000
 50
Miami‐Dade FL Public
Safety 31.)
Community
Policing‐
City
of
Opa
Locka
School
Resource
Officer
Project,
The
SRO's
will
provide
preven3on

educa3on,
counseling
and
mentoring
for
students
in
the
local
elementary
school
using
the
Ambassador

curriculum.
This
unique
program
whose
design 















4,508

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
Aventura
Schools
Resource
Officer
Project 















5,853

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
Coral
Gables
Criminal
Jus3ce
Records
Improvement
Project 















7,982

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
Coral
Gables
Criminal
Jus3ce
Records
Improvement
Project,
purchase
of
handheld

E‐Ticke3ng
devices;
implementa3on
of
this
technological
upgrade
has
reduced
the
3me
an
officer
spends

handling
traffic
stops;
minimized
the
resu 















7,982

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
Florida
City
Criminal
Jus3ce
Records
Improvement
Project 















3,158

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
Hialeah
Gardens
Criminal
Jus3ce
Records
Improvement
Project 















5,130

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
Miami
Criminal
Jus3ce
Records
Improvement
Project,
to
fully
automate
field

report
entry
in
the
Records
Unit
Grant
funds
will
enable
the
Records
Unit
to
eliminate
the
backlog
of
reports

entered
into
the
Department's
LRMS, 














23,848

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
Miami
Springs
Criminal
Jus3ce
Records
Improvement
Project,
Miami
Spring

proposes
to
use
JAG
funds
to
allow
staff
on
an
over3me
basis
to
scan,
index,
and
destroy
imaged
paper
records

as
appropriate. 















4,405

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
North
Bay
Village
Criminal
Jus3ce
Records
Improvement
Project,
The
North
Bay

Village
Police
Department
has
used
grant
funds
to
help
improve
their
criminal
jus3ce
records
management

system
North
Bay
Village
proposes
to
purchas 















3,448

Miami‐Dade FL Public
Safety Community
Policing‐
City
of
West
Miami
Criminal
Jus3ce
Records
Improvement
Project,
the
Department

wishes
to
purchase
handheld
electronic
3cke3ng
devices
for
the
patrol
unit.
The
use
of
electronic
3cke3ng

devices
will
reduce
the
3me
needed
 















3,318

Miami‐Dade FL Public
Safety Community
Policing‐
Intensive
Day/Night
Treatment
Program 












302,300

Miami‐Dade FL Public
Safety Community
Policing‐
Miami‐Dade
County
automated
arrest
(A‐Forms)
Project 










2,000,000

Miami‐Dade FL Public
Safety Community
Policing‐
Miami‐Dade
Police
Department
Crime
Preven3on
Awareness
Project 












130,000

Miami‐Dade FL Public
Safety Community
Policing‐
Town
of
Cutler
Bay
Domes3c
Violence
Project 















6,865

Miami‐Dade FL Public
Safety Community
Policing‐
Town
of
Miami
Lakes
School
Resource
Officer
Project,
Miami
Lakes
Police
Department
will

con3nue
to
use
JAG
funds
to
provide
interven3on
and
preven3on
services
to
local
youth;
crime
preven3on

presenta3ons
and
conduct
truancy
sweeps 















5,554

Miami‐Dade FL Public
Safety Police‐
Strategic
Enforcement
Opera3ons
Strategy 










5,000,000

Miami‐Dade FL Public
Safety Automated
arrest
(A‐Forms)
Project
for
Miami‐Dade
Police
Department. 










2,000,000
 0
Miami‐Dade FL Public
Safety Crime
Preven3on
Display
Vehicle
for
Miami‐Dade
Police
Department. 












130,000
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project
proposes
to
use
JAG
funds
to
allow
staff
on
an
over3me
basis
to

scan,
index,
and
destroy
imaged
paper
records
as
appropriate. 















4,405
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
a
move
from
a
system
of
manuals
and
forms
to
electronic

format
that
members
can
access
via
computer. 















2,739
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
purchase
of
2
E‐Ticke3ng
devices
for
Officers
to
be
used
in
the

field
for
scanning
driver's
licenses. 















2,452
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
purchase
of
handheld
E‐Ticke3ng
devices. 















7,982
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
purchase
of
sobware
to
enable
officers
to
access
FCIC/NCIC

directly. 















2,409
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
the 















3,976
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
the
purchase
of
an
Internet‐based
data
sharing
system. 














15,352
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
to
fully
automate
field
report
entry
in
the
Records
Unit
Grant

funds. 














23,848
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
to
fully
automate
field
report
entry
in
the
Records
Unit. 














23,848
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
to
help
improve
criminal
jus3ce
records
management
system
by

purchasing
two
computers. 















3,448
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
to
purchase
handheld
electronic
3cke3ng
devices
for
the
patrol

unit. 















3,318
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
to
purchase
new
sobware
upgrade
agreement. 















5,130
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
to
purchase
sobware
and
hardware
including
personal
data

assistants
(PDA's)
used
to
access
criminal
jus3ce
informa3on
data. 















3,174
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
to
replace
and
upgrade
Computer
Aided
Dispatch
and
Records

management
System. 














14,179
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project,
upgrade
the
department’s
record
system. 















3,806
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project:
Move
from
paper‐based
to
electronic
records. 















3,448
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project:
Purchase
of
a
Network
Storage
Device
along
with
any
required

accessories
and
or
moun3ng
hardware. 















4,664
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project:
Purchase
of
sobware
and
hardware
including
personal
data

assistants
(PDA's)
used
to
access
criminal
jus3ce
informa3on
data. 















3,174
 0
City State Program Project
Descrip3on Funding
Required Jobs
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project:
The
department
is
proposing
to
purchase
two
addi3onal
laptop

computers
for
the
patrol
unit. 















3,976
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project:
Transi3on
from
manuals
and
forms
to
electronic
format. 















2,739
 0
Miami‐Dade FL Public
Safety Criminal
Jus3ce
Records
Improvement
Project:
Use
of
JAG
funds
to
allow
staff
on
an
over3me
basis
to
scan,

index,
and
destroy
imaged
paper
records
as
appropriate. 















4,405
 0
Miami‐Dade FL Public
Safety Domes3c
Violence
Project,
to
expand
their
efforts
to
educate
youth
on
domes3c
abuse
issues. 















8,348
 0
Miami‐Dade FL Public
Safety Domes3c
Violence
Project,
to
hire
a
Family
Crimes
Domes3c
Violence
Coordinator. 














31,181
 0
Miami‐Dade FL Public
Safety Domes3c
Violence
Project:
Educa3on
and 















4,328
 0
Miami‐Dade FL Public
Safety Intensive
Day/Night
Treatment
Program. 












302,300
 0
Miami‐Dade FL Public
Safety Radio
enhancement
to
support
2,600
radios
for
Miami‐Dade
Police
Department. 








11,000,000
 0
Miami‐Dade FL Public
Safety Resource
Officer
Project,
Officers
will
teach
the
RADKids
curriculum
in
10
of
the
city’s
schools. 














23,848
 0
Miami‐Dade FL Public
Safety School
Resource
Officer
Project,
con3nued
use
of
JAG
funds
to
provide
interven3on
and
preven3on
services
to

local
youth. 















5,554
 0
Miami‐Dade FL Public
Safety School
Resource
Officer
Project,
purchase
of
program
equipment
and
supplies
necessary
to
maintain
and

enhance
exis3ng
SRO
program. 















5,090
 0
Miami‐Dade FL Public
Safety School
Resource
Officer
Project,
The
SRO's
will
provide
preven3on
educa3on,
counseling
and
mentoring
for

students
in
the
local
elementary
school
using
the
Ambassador
curriculum. 















4,508
 0
Miami‐Dade FL Public
Safety School
Resource
Officer
Project:
to
provide
preven3on
educa3on,
counseling
and
mentoring
for
students. 















4,508
 0
Miami‐Dade FL Public
Safety Targeted
enforcement
suppression
efforts
for
Miami‐Dade
Police
Department. 










5,000,000
 0
Miami‐Dade FL Public
Safety Violent
Crime
Ini3a3ves
Community
Policing
Strategy
for
Miami‐Dade
Police
Department. 










5,000,000
 0
Miami‐Dade FL Public
Safety Mobile
Automated
Fingerprint
Informa3on
System,
e‐Cita3on,
automated
field
repor3ng
for
Miami‐Dade

Police
Department. 










6,800,000
 4
Miami‐Dade FL Public
Safety Police‐
Mission
Cri3cal
Technology 










6,800,000
 4
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
35
AVE
from
NW
30
ST
to
NW
35
ST
located
in

the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














28,500
 3
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
75
ST
from
NW
14
AVE
to
NW
17
AVE
located

in
the
Model
City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














28,500
 3
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
192
ST
from
SW
117
AVE
to
SW
114
AVE

located
in
the
Perrine
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 














28,500
 3
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
272
ST
from
SW
145
AVE
to
SW
142
AVE

located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
Districts
8
and
9 














28,500
 3
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
20
Ave
from
87
ST
to
NW
95
ST
located
in
the

West
Lifle
River
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














48,000
 4
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
27
ST
from
NW
32
AVE
to
NW
27
AVE
located

in
the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














48,000
 4
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
102
AVE
from
SW
176
ST
to
SW
182
ST
located

in
the
Perrine
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 














40,000
 4
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
104
AVE
from
SW
176
ST
to
SW
184
ST
located

in
the
Perrine
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 














48,000
 4
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
142
AVE
from
SW
256
ST
to
SW
240
AVE

located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
8 














48,000
 4
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
147
AVE
from
SW
288
ST
to
SW
296
ST
located

in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
Districts
8
and
9 














48,000
 4
Miami‐Dade FL Streets/Roads Greenway
Bridges
‐
Biscayne
and
Black
Creek
Trail 












758,000
 5
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
29
AVE
from
NW
21
ST
to
NW
32
ST
located
in

the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














67,000
 5
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
35
ST
from
NW
37
AVE
to
NW
30
AVE
located

in
the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














67,000
 5
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
252
ST
from
SW
137
AVE
to
SW
147
AVE

located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
8 














67,000
 5
Miami‐Dade FL Streets/Roads Snake
Creek
Greenway
Overpass
at
I‐95/South
Florida
Rail
Corridor 












800,000
 5
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
30
AVE
from
NW
22
ST
to
NW
35
ST
located
in

the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














76,500
 6
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
30
ST
from
NW
27
AVE
to
NW
35
AVE
located

in
the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














76,500
 6
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
46
ST
from
NW
19
AVE
to
NW
27
AVE
located

in
the
Model
City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 














76,500
 6
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
180
ST
from
SW
102
AVE
to
SW
112
AVE

located
in
the
Perrine
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 












120,000
 6
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
264
ST
from
SW
137
AVE
to
SW
145
AVE

located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 














76,500
 6
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
State
Road
9
from
golden
glades
to
NW
22
AVE

located
in
the
Opa‐Locka
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
1 












200,000
 10
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
112
AVE
from
SW
248
ST
to
SW
211
ST
located

in
the
Goulds
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
Districts
8
and
9 












220,000
 10
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
232
ST
from
SW
112
AVE
to
SW
87
AVE
located

in
the
Goulds
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
8 












240,000
 10
Miami‐Dade FL Streets/Roads Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
248
ST
from
SW
112
AVE
to
87
AVE
located
in

the
Goulds
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
Districts
8
and
9 












240,000
 10
Miami‐Dade FL Streets/Roads Public
Works
‐
sidewalk
improvements
SW
216
St
and
SW
224
St
from
SW
112
Ave
to
SW
117
Ave 












494,000
 11
Miami‐Dade FL Streets/Roads Public
Works‐
Sidewalk
Improvements
in
the
area
of
NW
21
Av.
&
94
St.
‐
95
St.
located
in
the
West
Lifle
River

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














32,500
 11
Miami‐Dade FL Streets/Roads Public
Works‐
Sidewalk
Improvements
in
the
area
of
NW
23
Av.
&
91
St.
‐
95
St.
located
in
the
West
Lifle
River

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














92,300
 11
Miami‐Dade FL Streets/Roads Public
Works‐
Sidewalk
Improvements
in
the
area
of
NW
64
St.
‐
65
St.
&
NW
21
Av.
‐
22
Av.
located
in
the

Model
City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 












126,100
 11
City State Program Project
Descrip3on Funding
Required Jobs
Miami‐Dade FL Streets/Roads Public
Works‐
Sidewalk
Improvements
in
the
area
of
NW
91
St.
‐
95
St.
&
NW
22
Av.
‐
24
Av.
located
in
the
West

Lifle
River
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 












144,300
 11
Miami‐Dade FL Streets/Roads Public
Works‐
Sidewalk
Improvements
in
the
area
of
SW
122
Av.
&
216
St.
‐
223
St.
located
in
the
Goulds

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 












123,500
 11
Miami‐Dade FL Streets/Roads Public
Works
‐
drainage
improvement
12420
SW
218
St 












265,000
 13
Miami‐Dade FL Streets/Roads Public
Works
‐
drainage
improvement
NW
22
Ave
from
NW
54
St
to
NW
56
St 












230,000
 13
Miami‐Dade FL Streets/Roads Public
Works
‐
drainage
improvement
NW
77
St
in
3003
block
to
3012
block 












405,000
 13
Miami‐Dade FL Streets/Roads Public
Works
‐
drainage
improvements
at
NW
37
Ave
and
NW
41
St 












225,000
 13
Miami‐Dade FL Streets/Roads Public
Works
‐
drainage
improvment
3300
block
of
NW
41
St 












365,000
 13
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
improvements
to
NW
77
Terrace
from
NW
22
Ave
to
NW
24
Ave 












575,000
 13
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
improvements
to
West
Guava
Street
and
Duval
Avenue 












630,000
 13
Miami‐Dade FL Streets/Roads Public
Works‐
Drainage
Improvements
in
the
area
of
10820
SW
200
Dr
located
in
the
Perrine
Neighborhood

Revitaliza3on
Strategy
Area,
Commission
District
9 












127,000
 13
Miami‐Dade FL Streets/Roads Public
Works‐
Drainage
Improvements
in
the
area
of
11261
SW
220th
St
located
in
the
Goulds
Neighborhood

Revitaliza3on
Strategy
Area,
Commission
District
9 












210,000
 13
Miami‐Dade FL Streets/Roads Public
Works‐
Drainage
Improvements
in
the
area
of
2411
‐2441
NW
65
ST

located
in
the
Model
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 












100,000
 13
Miami‐Dade FL Streets/Roads Public
Works‐
Drainage
Improvements
in
the
area
of
27100
SW
142
CT
located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 












135,000
 13
Miami‐Dade FL Streets/Roads Public
Works‐
Drainage
Improvements
in
the
area
of
2740
NW
44th
St
(W/O
NW
27
Ave)
located
in
the
Model

City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 












125,000
 13
Miami‐Dade FL Streets/Roads Public
Works‐
Drainage
Improvements
in
the
area
of
5573
NW
24
Ave
(E/O
NW
24th
Ave)
located
in
the
Model

City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 












125,000
 13
Miami‐Dade FL Streets/Roads Public
Works‐
Drainage
Improvements
in
the
area
of
773
NW
75
St
(W/O
NW
7
Ave)
located
in
the
Model
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 












185,000
 13
Miami‐Dade FL Streets/Roads Public
Works‐
Drainage
Improvements
in
the
area
of
NW
65th
St
W/O
NW
18th
Ave
located
in
the
Model
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 














35,000
 13
Miami‐Dade FL Streets/Roads Roadway
improvements
and
beau3fica3on:
Vene3an
Causeway
Streetscape. 










1,000,000
 15
Miami‐Dade FL Streets/Roads Transit‐Develop
and
deploy
Bridge
Inspec3on
and
Track
Infrastructure
Management
System 










3,088,000
 15
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
in
area
bounded
by
SW
264
St
and
SW
272
St
from
SW
137
to
SW
147
Ave 












650,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
in
area
bounded
by
SW
264
St
and
SW
272
St
from
SW
137
to
SW
147
Ave 












650,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NE
10
Ave 












275,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
12
Ave
from
NW
71
St
to
NW
79
St 












570,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
17
Ave
from
NW
71
St
to
NW
79
St 












570,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
22
Ave
and
NW
27
Ave
from
NW
62
St
to
NW
71
St 












850,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
54
St
and
NW
62
St
from
NW
17
Ave
to
NW
22
Ave 












475,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
71
St
and
NW
79
St
from
NW
27
Ave
to
NW
37
Ave 












930,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
71
St
from
NW
12
Ave
to
NW
17
Ave 












570,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
107
Ave
and
SW
117
Ave
from
SW
211
St
to
SW
216
St 












211,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
157
Ave
from
SW
280
St
to
SW
308
St 












465,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
216
St
and
SW
232
St
from
SW
97
Ave
to
SW
107
Ave 












787,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
216
St
from
US
1
to
SW
112
Ave 












285,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
248
St
from
US
1
to
SW
147
Ave 












410,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
288
St
and
SW
296
St
from
SW
147
Ave
to
SW
157
Ave 












910,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
296
St
from
SW
157
Ave
to
SW177
Ave 












380,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
84
St
from
US
1
to
SW
112
Ave 












915,000
 20
Miami‐Dade FL Streets/Roads Public
Works‐
Resurfacing
of
roadways
in
the
area
of
NE
17
ST
(N
MIAMI
AVE
‐
NE
1
AVE)
located
in
the
Model

City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 














70,000
 20
Miami‐Dade FL Streets/Roads Public
Works‐
Resurfacing
of
roadways
in
the
area
of
NW
38
ST
(NW
22
AVE
‐
NW
27
AVE)
located
in
the

Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 












120,000
 20
Miami‐Dade FL Streets/Roads Public
Works‐
Resurfacing
of
roadways
in
the
area
of
SW
107
AVE‐SW
117
AVE
&
SW
211
ST
‐
SW
216
ST

located
in
the
Goulds
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 












211,000
 20
Miami‐Dade FL Streets/Roads Public
Works‐
Resurfacing
of
roadways
in
the
area
of
SW
216
ST
from
US‐1
to
SW
127
AV
located
in
the
Goulds

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 












165,000
 20
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
32
Ave
from
N.
River
Dr
to
NW
41
St 










1,050,000
 25
Miami‐Dade FL Streets/Roads Public
Works‐
NW
74
St
Environmental 










4,692,851
 25
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
87
St
and
NW
95
St
from
NW
27
Ave
to
NW
37
Ave 










1,125,000
 27
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
SW
184
St
and
SW
200
St
from
SW
107
Ave
to
SW
117
Ave 










2,520,000
 30
Miami‐Dade FL Streets/Roads Public
Works
‐
roadway
resurfacing
NW
32
Ave
from
NW
41
St
to
NW
79
St 










1,300,000
 31
Miami‐Dade FL Streets/Roads Public
Works‐
Vene3an
Bridges
Rehabilita3on 










7,000,000
 32
Miami‐Dade FL Streets/Roads Public
Works‐
Pavement
resurfacing,
storm
drainage
improvements,
curb
and
gufers
improvements,
and

sidewalk
improvements
on
SW
180
Street
from
SW
147
Ave
to
SW
137
Ave 










1,406,000
 35
Miami‐Dade FL Streets/Roads Public
Works‐
Roadway
Improvements
to
NW
106
Street
and
NW
S.
River
Drive
Culvert 












987,000
 35
Miami‐Dade FL Streets/Roads Roadway
improvements
including
concrete
median,
milling
and
resurfacing,
con3nuous
storm
drainage

system,
curb
and
gufers,
and
sidewalk
replacement
on
SW
72
Avenue
from
SW
40
Street
to
SW
20
Street 










1,418,000
 35
Miami‐Dade FL Streets/Roads Roadway
widening,
resurfacing,
traffic
circles,
and
drainage
on
SW
142
Ave
from
Sw
42
Street
to
SW
26
Street 










1,125,000
 35
Miami‐Dade FL Streets/Roads Construc3on
of
a
new
4
lane
roadway
and
other
infrastructure
on
SW
184
Street
from
SW
147
Ave
to
SW
137

Ave. 












500,000
 62
Miami‐Dade FL Streets/Roads Construc3on
of
a
new
4
lane
roadway
and
other
infrastructure
on
W
76
Street
from
W
36
Ave
to
W
28
Ave. 










7,508,000
 62
Miami‐Dade FL Streets/Roads Construc3on
of
a
new
4
lane
roadway
and
other
infrastructure
W
76
Street
from
W
28
Ave
to
W
20
Ave. 










6,169,548
 62
Miami‐Dade FL Streets/Roads Construc3on
of
a
new
4
lane
roadway
and
other
improvements
on
W
24
Avenue
from
W
52
Street
to
W
76

Street. 










9,821,000
 89
Miami‐Dade FL Streets/Roads NW
138
Street
and
Bridge
(over
Miami
River
Canal):
Roadway
widening
and
bridge
replacement. 










6,936,000
 91
Miami‐Dade FL Streets/Roads Roadway
widening
and
bridge
replacement
on
SW
160
Street
from
SW
147
Ave
to
SW
137
Ave. 










6,833,000
 91
Miami‐Dade FL Streets/Roads Construc3on
of
a
new
4
lane
roadway
on
SW
157
Avenue
from
SW
136
Street
to
Sw
120
Street. 










9,672,000
 113
City State Program Project
Descrip3on Funding
Required Jobs
Miami‐Dade FL Streets/Roads Construc3on
of
the
new
6
lane
roadway
between
NW
107
Ave
to
NW
87
Ave
and
expansion
to
5
lanes
from
87

to
84
Avenue. 








28,873,069
 115
Miami‐Dade FL Streets/Roads Miami
Interna3onal
Airport
‐
widen
perimeter
road
through
NW
42
St
away
from
fuel
farm 








24,000,000
 130
Miami‐Dade FL Streets/Roads Public
Works
‐
Rebuild
Vene3an
Causeway
Bridges 






110,000,000
 150
Miami‐Dade FL Streets/Roads Miami
Interna3onal
Airport
‐
widen
Central
Boulevard
and
service
loop
road 








97,000,000
 250
Miami‐Dade FL Streets/Roads Miami‐Dade
Transit
‐
Orange
Line
Phase
1,
2.4
mile
fixed
guideway
connec3ng
exis3ng
line
to
Miami

Intermodal
Center 






426,529,000
 250
Miami‐Dade FL Streets/Roads NW
25
Street
Viaduct
Phase
1 








50,000,000
 300
Miami‐Dade FL Streets/Roads Miami‐Dade
Transit
‐
Orange
Line
Phase
2,
9.5
mile
North
Corridor
Segment
to
Broward
County
line 




1,409,000,000
 400
Miami‐Dade FL Streets/Roads Miami‐Dade
Transit
‐
Orange
Line
Phase
3,
10.5
mile
East‐West
segment
connec3ng
Miami
Intermodal
Center

to
west
Miami‐Dade
urban
centers 




2,463,000,000
 400
Miami‐Dade FL Streets/Roads Seaport
Tunnel
Project
from
connec3ng
interstate
system
to
Miami's
Seaport;
amount
is
County
share 






400,000,000
 450
Miami‐Dade FL Transit Transit
Facility
Improvements‐
Transit
physical
plant
renova3ons
and
upgrades
including
garages
and

warehouse
facili3es 










3,120,000
 3
Miami‐Dade FL Transit Metrobus
Infrastructure
Replacement‐
Metrobus
refurbishment
and
safety
projects 








18,434,000
 31
Miami‐Dade FL Transit Metromover
Infrastructure
Replacement
‐
Metromover
refurbishment
projects 








21,071,000
 38
Miami‐Dade FL Transit Metrorail
Track
and
Guideway
Rehabilita3on
‐
Perform
rehabilita3on
of
exis3ng
fixed
guideway
system 








34,300,000
 40
Miami‐Dade FL Transit Metrorail
Infrastructure
Replacement
‐
Metrorail
refurbishment
projects
exclusing
guideway
refurbishment 








16,150,000
 55
Miami‐Dade FL Water Water
and
Sewer
‐
South
Miami
Neighborhood
Revitaliza3on
Strategy
Area
remove
2"
water
main
and
replace

with
8"
water
main 










1,389,960
 4
Miami‐Dade FL Water Solid
Waste
Management
‐
North
Dade
Landfill
groundwater
remedia3on
project 










1,500,000
 5
Miami‐Dade FL Water Solid
Waste
Management
‐
South
Dade
Landfill
groundwater
remedia3on
project 










5,000,000
 5
Miami‐Dade FL Water Water
and
Sewer
‐
Melrose
Neighborhood
Revitaliza3on
Strategy
Area
remove
4"
water
main
and
replace
with

8"
water
main 










1,853,280
 6
Miami‐Dade FL Water Water
and
Sewer
‐
cleaning
and
surveying
of
large
diameter
sewers 










1,500,000
 7
Miami‐Dade FL Water Water
and
Sewer
‐
Improvement
to
water
main
along
SR
5/US
1
from
SW
228
St
to
SW
268
St 










2,425,826
 8
Miami‐Dade FL Water Water
and
Sewer
‐
rehabilita3on
of
sanitary
sewers
by
the
sec3onal
lining
method. 










1,000,000
 8
Miami‐Dade FL Water Water
and
Sewer
‐
Goulds
Neighborhood
Revitaliza3on
Strategy
Area
replace
2"
and
4"
water
mains
with
8"

water
main 










2,808,000
 9
Miami‐Dade FL Water Water
and
Sewer
‐
Model
City
Neighborhood
remove
4"
water
main
and
replace
with
8"
water
main 










3,088,800
 10
Miami‐Dade FL Water Water
and
Sewer
‐
West
Lifle
River
Neighborhood
Revitaliza3on
Strategy
Area
remove
4"
water
main
and

replace
with
8"
water
main 










3,706,560
 12
Miami‐Dade FL Water Water
and
Sewer
‐
One‐Year
Countywide
Contract
w/op3on
to
renew
for
the
Rehabilita3on
of
sanitary
Sewers

by
the
Cured‐In‐Place
Lining
Method
(S‐838). 










4,600,000
 17
Miami‐Dade FL Water Water
and
Sewer
‐
install
re‐use
pipe
to
distribute
reclaimed
water
to
industrial
users
in
South
Miami‐Dade 










6,200,000
 20
Miami‐Dade FL Water Water
and
Sewer
‐
Leisure
City
Neighborhood
Revitaliza3on
Strategy
Area
remove
2"
water
main
and
replace

with
8"
water
main 










7,394,400
 24
Miami‐Dade FL Water Water
and
Sewer
‐
Installa3on
of
200
groundwater
monitoring
wells
that
are
required
in
order
to
implement

the
Pump
Sta3on
Op3miza3on
Program.

This
improvement
will
prevent
and/or
reduce
overflows
during
peak

flow
events. 












500,000
 30
Miami‐Dade FL Water Water
and
Sewer
‐
Miscellaneous
repairs
(electrical,
structural
&
mechanical)
at
wastewater
system
pump

sta3ons. 








17,500,000
 30
Miami‐Dade FL Water Water
and
Sewer
‐
Removal
and
Replacement
of
Sanitary
Sewer
Gravity
Mains. 










6,500,000
 48
Miami‐Dade FL Water Water
and
Sewer
‐
construct
South
District
Water
Reclaim
Plant 






267,000,000
 75
Miami‐Dade FL Water Water
and
Sewer
‐
water
and
wastewater
treatment
facili3es
and
rehabilita3on
of
infrastructure 








25,848,012
 358
Miami‐Dade FL Water Water
and
wastewater
treatment
facility
improvements
and
rehabilita3on
of
aging
infrastructure. 








25,848,012
 358
Miramar FL CDBG Commercial
Rehab. 












200,000
 10
Miramar FL Public
Safety Police
Officers 












500,000
 6
North
Miami FL CDBG Con3nue
improvements
to
swales
and
sidewalks
in
areas
where
swales
are
deteriorated
and
not
func3onal
to

reduce
flooding
and
improve
the
overall
appearance
of
neighborhoods. 















2,000
 10
North
Miami FL CDBG Revive
the
Commercial
Facade
Program
to
provide
grants
to
exis3ng
businesses
to
assist
with
the
exterior

facade
of
buildings
to
prevent
the
appearance
of
blight
and
stabilize
the
commercial
areas. 










2,000,000
 10
North
Miami FL CDBG Business
Incubator
program
to
help
new
busnesses
and
retain
exis3ng
businesses
by
providing
"start
up"
funds

to
bring
them
to
the
City
or
providing
funds
to
retain
the
business. 










5,000,000
 30
North
Miami FL Energy Establish
a
"Change
a
light
bulb"
program
for
all
income
eligible
households
and
change
out
all
Incandescent

bulbs
to
compact
fluorescent
bulbs
to
reduce
energy
consump3on
City
wide. 










2,000,000
 2
North
Miami FL Energy Install
solar
panels
and
wind
turbines
where
applicable
beginning
with
all
City
owned
facili3es
to
reduce

energy
and
create
renewable
energy
produc3on. 










5,000,000
 10
North
Miami FL Energy Retrofit
of
all
City
owned
facili3es
by
changing
out
light
fixtures,
replacing
switches
with
censor
controls
to

increase
energy
efficiency. 










5,000,000
 10
North
Miami FL Public
Safety Strike
Team
‐
This
project
will

fund
the
Targe3ng
Violent
Crime
(Strike
Team)
ini3a3ve.
to
iden3fy
crime
trends

and
paferns,
gang
members,
and
build
criminal
cases
against
iden3fiable
offenders.
Violent
crimes
targeted

will
be
violent
Part
1
Crimes 












584,390
 0
North
Miami FL Public
Safety Public
Service
Aides
‐
This
project
will
fund
two
addi3onal
Public
Service
Aide
posi3ons.
These
Public
Service

Aides
will
handle
non‐violent
report
calls
(pefy
thebs,
minor
accidents,
abandoned
vehicles,
etc.)
and
will

provide
relief
to
Uniform
Patrol 












190,632
 2
North
Miami FL Public
Safety School
Resource
Officers
‐
This
project
will
allow
us
to
fund
two
full
3me
school
resource
officers
to
be

deployed
to
work
in
and
around
middle
and
senior
high
schools.
 












266,560
 2
North
Miami FL Public
Safety Solving
Cold
Cases
with
DNA
‐
This
project
will
allow
us
to
eliminate
the
backlog
of
approximately
35
cold
case

homicides
and
approximately
300
cold
case
sex
crimes.
This
will
allow
us
to
use
newer
DNA
technologies
such

as
Short
Tandem
Repeats
(STRj) 












470,782
 2
North
Miami FL Public
Safety Support

for
the
Communica3ons
and
Records
Management
System
‐
The
Police
Department

recently

purchased
a
new
CAD
system.

These
funds
will
be
used
to
hire
two
informa3on
technology
specialists
to

implement
and
support
on
an
on‐going
basis
the
PD's
CAD 












140,000
 2
North
Miami FL Public
Safety Community
Oriented
Police
Officers
‐
This
project
will
allow
us
to
fund
3
full
3me
community
oriented
police

officers. 












399,840
 3
City State Program Project
Descrip3on Funding
Required Jobs
North
Miami FL Public
Safety Patrol
Officers
‐
This
project
will
fund
five
addi3onal
police
officers
to
augment
our
current
patrol
staffing.

These
addi3onal
officers
will
specifically
be
used
in
areas
of

directed
patrol
and
proac3ve
crime
reduc3on

opera3ons. 












666,400
 5
North
Miami FL Streets/Roads Pedestrian
walk
way
and
handicap
ramp
repairs
and
construc3on
in
areas
that
are
without. 










2,500,000
 10
North
Miami FL Streets/Roads Asphalt
overlaying
of
deteriora3ng
roads
throughtout
the
city. 










5,000,000
 12
North
Miami FL Streets/Roads Replace
worn
out
walk
bridge
across
canal
which
carries
students
from
one
side
of
the
city
to
the
other
for

school.
This
walk
bridge
also
has
a
few
water
and
sewer
lines
afached
that
would
require
work. 










2,000,000
 15
North
Miami FL Transit Addi3onal
transit/hub
shelters
is
needed
to
service
the
exis3ng
and
expected
ridership
which
will
be
generated

by
the
acquisi3on
of
the
7
new
buses. 












250,000
 1
North
Miami FL Transit Land
will
be
needed
to
store
and
maintain
the
buses
when
purchased. 










1,200,000
 1
North
Miami FL Transit To
expand
our
exis3ng
NOMI
Transit
Circulator
system
by
bringing
the
service
inhouse
and
acquiring
a
total
of

seven
(7)
Azure
Hybrid
buses
which
will
reduce
carbon
emissions
by
30%. 










1,500,000
 10
North
Miami FL Water Purchase
addi3onal
property
for
expansion
of
water
treatment
facility
and
clear
the
property
for
construc3on. 










1,600,000
 6
North
Miami FL Water Rehabilita3on
of
ten
(10)
exis3ng
sewer
lib
sta3ons
that
collect
from
gravity
sewers
in
residen3al
areas. 












600,000
 7
North
Miami FL Water Lining
of
exis3ng
sanitary
sewer
force
mains
of
various
size
pipes
to
stop
water
from
infiltra3ng
the
pipes. 








10,000,000
 10
North
Miami FL Water Installa3on
of
test
/
produc3on
well
for
new
R/O
Treatment
facility. 










5,000,000
 15
North
Miami FL Water Upgrade
of
exis3ng
lime
sobening
water
treatment
plant
and
construc3on
of
a
new
reverse
osmosis
water

treatment
facility
to
be
completed
by
year
2014
with
phases
through
2010. 






120,000,000
 200
North
Miami
Beach FL Public
Safety Police
Technology
Upgrades 












400,000
 3
North
Miami
Beach FL Public
Safety Police
Officer
Jobs 












500,000
 15
North
Miami
Beach FL Streets/Roads The
Greynolds
Park
Golf
Course
Perimeter
Bike
Path:
Between
NE
20‐22
Avenues
from
NE
174‐179
Streets,

connec3ng
Government
Center
neighborhood
to
Greynolds
Park 














85,000
 12
North
Miami
Beach FL Streets/Roads The
NE
183
Street
Bike
Path:
between
the
exis3ng

North
Glades
bike
path

and
ending
at
Greynolds
Park 












138,000
 12
North
Miami
Beach FL Streets/Roads The
East
Drive
Bike
Path:
Connec3ng
The
Uleta
Neighborhood

through
Litman
Park

and
then
onto
the
exis3ng

South
Glades
Drive
Bike
Path. 












220,000
 15
North
Miami
Beach FL Streets/Roads New
Linear
Park
with
Bike
path
by
closing
Miami
Drive
between
NE
159‐163
Streets.
Will
connect

the
NE
13

Avenue

and
15
Avenue
bike
paths. 












300,000
 20
North
Miami
Beach FL Transit NE
161
Street
Roadway
Improvement 












300,000
 20
North
Miami
Beach FL Transit NE
179
Street
Curbing
and
Street
Resurfacing 












300,000
 20
North
Miami
Beach FL Transit Eastern
Shores
&
Allen
Park
Street
Resurfacing 












450,000
 25
North
Miami
Beach FL Transit South
Glades
Drive
Roadway
Improvement 












800,000
 40
North
Miami
Beach FL Water Dade
North
Fireflow
improvements
Ph
1
&
2‐
3,600
l.f.
12"
W.M
w/
6
fire
hydrants 












300,000
 10
North
Miami
Beach FL Water Fire
Hydrant
installa3on
project
Ph1‐3
.
Approx
75
Fire
Hydrants
installed. 












375,000
 10
North
Miami
Beach FL Water Mitchell
Lake
Estates
system
Beferment.
3,450
l.f.
8"
water
main
replacement
with
4
fire
hydrants 












280,000
 10
North
Miami
Beach FL Water Myrtle
Grove
Fireflow
improvements
3,750
l.f.
8"
&
12"
pipe
with
6
fire
hydrants 












300,000
 10
North
Miami
Beach FL Water Myrtle
Grove
Force
main
replacement.
3,500
l.f.
of
8"
&
12"
pipe 












225,000
 10
North
Miami
Beach FL Water NW
151
Street
system
beferment.

2,650
l.f.
8"
&
12"
water
main
with
4
fire
hydrants 












225,000
 10
North
Miami
Beach FL Water Installa3on
of
Security
Perimeter
Wall
of
Norwood
Water
Treatment
Plant 












300,000
 15
North
Miami
Beach FL Water Protec3on
of
Well
Field
‐
VOC
Removal
Phase
II 












400,000
 25
North
Miami
Beach FL Water Installa3on
of
Emergency
Generator
at
the
Norwood
Water
Treatment
Plant 












795,000
 40
North
Miami
Beach FL Water Automated
Water
Meter
Reading
Project 








10,000,000
 50
Oakland
Park FL CDBG Complete
NE
12
Avenue
street
ends
with
pavers,
trellises,
benches,
fountains 












750,000
 20
Oakland
Park FL CDBG Retrofit
City
Hall,
14,000
sf,
windows,
roof,
generator 










1,190,000
 40
Oakland
Park FL CDBG Complete
phase
II‐
downtown
park
with
plaza,
parking,
ligh3ng
and
walking
path 










2,000,000
 60
Oakland
Park FL CDBG Harlem
McBride
drainage,
street
and
park
improvements 










2,000,000
 60
Oakland
Park FL CDBG Renovate
and
retrofit
downtown
park
building
into
arts
center 










3,500,000
 75
Oakland
Park FL CDBG NE
34
Ct.,
NE
5th
Ave.
to
NE
38th
Street,
streetscape,
drainage 










2,800,000
 80
Oakland
Park FL CDBG Replace
Aging
Fire
Sta3on
#9 










2,900,000
 90
Oakland
Park FL CDBG NE
38th
St.,
NE
11
Ave
‐
Andrews
Ave.

Drainage,
streetscape,
sidewalks 










3,600,000
 110
Oakland
Park FL CDBG Andrews
Ave.
streetscape,
ligh3ng,
landscape 










4,000,000
 120
Oakland
Park FL CDBG Prospect
Rd,
streetscape,
ligh3ng,
landscape 










4,000,000
 120
Oakland
Park FL CDBG NE
34
Ct.
Dixie
Hwy
to
Andrews
Ave.
,
sidewalks,
streetscape,
drainage 










6,400,000
 200
Oakland
Park FL CDBG Acquire
land
and
build
parking
garage
to
support
FEC
passenger
rail 










8,000,000
 240
Oakland
Park FL CDBG Replace
aging
Public
Works
facility 










8,000,000
 240
Oakland
Park FL CDBG Replace
aging
Collins
Center
with
40000
sf
mul3
purpose
center 








10,000,000
 300
Oakland
Park FL Public
Safety Replace
2
aging
Fire
Sta3ons 










6,800,000
 200
Oakland
Park FL Streets/Roads Rehabilitate
NE
16th
Ave.
bridge 












600,000
 18
Oakland
Park FL Streets/Roads Powerline
Rd
to
NE
10
Ave.
to
Prospect
Rd,
sidewalks,
landscaping,
streetscaping 










1,500,000
 45
Oakland
Park FL Streets/Roads Resurface
28
miles
of
roadway 










2,300,000
 70
Oakland
Park FL Streets/Roads NE
38
St.
,
NE
13th
Ave.
to
NE
11th
Ave.
realignment
of
intersec3on,
sidewalks,
streetscape 










2,627,390
 75
Oakland
Park FL Streets/Roads Build
25
miles
of
sidewalk/trails 










2,900,000
 85
Oakland
Park FL Streets/Roads NE
38th
St.,
Andrews
to
Powerline
Rd.,
streetscape,
landscaping,
sidewalks 










3,800,000
 110
Oakland
Park FL Water Wastewater
study 












250,000
 8
Oakland
Park FL Water Rock
Island
water,
sewer,
landscaping 










1,000,000
 30
Oakland
Park FL Water Garden
Acres
sewer,
street
improvements 










2,000,000
 60
Oakland
Park FL Water Lib
Sta3on
replacements 










2,366,000
 75
Oakland
Park FL Water Automated
water
meter
reading
project 










1,700,000
 80
Oakland
Park FL Water Sewer
Force
Main
Replacements 










3,000,000
 90
Oakland
Park FL Water Inflow
and
inflowtra3on
correc3on
project 










5,000,000
 150
Oakland
Park FL Water Waterline
replacements
for
50
yr
old
lines 








10,600,000
 315
Orlando FL Airport ORLANDO
EXECUTIVE
AIRPORT‐Airport
Drainage
&
Master
Plan
Updates 












500,000
 4
Orlando FL Airport ORLANDO
INTERNATIONAL
AIRPORT‐Upgrade
Airfield
Ligh3ng
Equipment 










1,300,000
 8
Orlando FL Airport ORLANDO
EXECUTIVE
AIRPORT‐Airfield
Improvement
Projects 










3,200,000
 20
Orlando FL Airport ORLANDO
INTERNATIONAL
AIRPORT‐Rehabilita3on
of
Taxiway
C‐Phase
2 








20,000,000
 100
Orlando FL Amtrak Orlando
Amtrak/Commuter
Rail
Transfer
Sta3on
Renova3on‐1400
Sligh
Blvd‐Orlando,
FL
32806 










3,500,000
 15
Orlando FL CDBG Center
for
Drug
Free
Living 














35,589
 3
City State Program Project
Descrip3on Funding
Required Jobs
Orlando FL CDBG Homeless
Assistance
Drop‐in
Center 










2,000,000
 5
Orlando FL CDBG Andora
Street
Drainage
Improvements 












350,000
 10
Orlando FL CDBG Bumby
Avenue
Resurfacing 












985,500
 10
Orlando FL CDBG Englewood/Monterey
Underdrain
Construc3on 










1,100,000
 10
Orlando FL CDBG Lake
Angel/Conroy
Basin
Drainage
Improvements 










1,000,000
 10
Orlando FL CDBG Lake
Dot/Hughey
Avenue
Stormwater
Retrofit
Project 










1,800,000
 10
Orlando FL CDBG Lake
Mann
Estates
Underdrain
Construc3on 












669,200
 10
Orlando FL CDBG Mercy
Drive
Resurfacing/Underdrains 












185,500
 10
Orlando FL CDBG New
Malibu
Underdrain
Construc3on 










1,100,000
 10
Orlando FL CDBG Oakley
Street
Drainage
Improvements 










1,000,000
 10
Orlando FL CDBG Orange
Blossom
Trail
Corridor
Drainage
Improvements 












850,000
 10
Orlando FL CDBG Center
for
Mul3cultural
Wellness
&
Preven3on‐Renova3on/Site
Improvement
for
Youth
Academic
Enrichment

Center 












245,500
 12
Orlando FL CDBG Coali3on
for
the
Homeless‐Women
&
Children
Bathroom
Facili3es
Renova3on 












274,197
 12
Orlando FL CDBG Quest,
Inc.‐South
Voca3onal
Facility
Rehabilita3on 












124,898
 12
Orlando FL CDBG Z.L.
Riley
Park 












200,000
 20
Orlando FL CDBG North
Parramore
Site
Development‐Infrastructure/site
improvements
for
housing
development
in
the

Parramore
neighborhood 










1,100,000
 25
Orlando FL CDBG Recrea3on
Facility
Improvements‐Loca3ons
throughout
the
City 










3,800,000
 60
Orlando FL CDBG Homeless
Men’s
Service
Center‐The
facility
would
provide
24/7
case
management,
suppor3ve
services

(including
job
training,
mental
health
and
substance
abuse
counseling)
and
beds
for
250
homeless
men.

It
will

be
a
two
story
28,000
sq.
b.
facility
with
a
covered
roobop
gathering
area.

The
project
will
incoroprate
"green"

builidng
principles. 










6,700,000
 70
Orlando FL CDBG Park
Improvements‐throughout
the
City 










7,725,000
 145
Orlando FL CDBG Mission
Road
Part
1
The
ini3al
segment
of
the
4‐lane
divided
arterial,
Mission
Road,
will
provide
cri3cal
surface

street
access
between
mul3‐family
housing
areas,
and
industrial/retail
employment
opportuni3es.

 










6,300,000
 234
Orlando FL Energy 600
Kilowaf
roobop
solar
array
system
downtown‐to
increase
renewable
energy
produc3on
in
Central
Florida

and
support
the
growing
solar
industry
in
Florida 










3,700,000
 53
Orlando FL Energy Illuminated
Street
Name
Signs
Upgrade
Project
‐This
project
will
provide
an
energy
savings
and
improve

naviga3on
throughout
the
City
by
replacing
incandescent
illuminated
street
name
signs
at
traffic
signals
with

energy
efficient
LED
street
name
signs. 










2,018,000
 75
Orlando FL Housing Griffin
Park
‐Playground
Equipment 














90,000
 2
Orlando FL Housing Ivey
Lane
Dumpster
Enclosures,
Approach
and
Landscaping 












122,000
 2
Orlando FL Housing Murchison
Terrace
Dumpster
Enclosures,
Approach
and
Landscaping 














61,000
 2
Orlando FL Housing Griffin
Park
‐Demoli3on
of
Building
812 














50,000
 5
Orlando FL Housing Reeves
Terrace‐Security
Fencing
&
Signage 












500,000
 8
Orlando FL Housing Citrus
Square‐Security
Ligh3ng 














75,000
 10
Orlando FL Public
Safety Digital
cameras
have
become
the
standard
for
photographing
crime
scenes,
accidents,
suspects,
etc.
Current

budget
constraints
have
hampered
the
purchase
of
new
&
replacement
s3ll
&
video
equipment
in
the
Orlando

Police
Department. 














65,000

Orlando FL Public
Safety Orlando
Police
Department's
Drug
Enforcement
Division
is
currently
u3lizing
out‐dated
covert
audio
and
video

equipment.
The
equipment
is
approximately
5
to
10
years
old.
The
division
is
also
in
need
of
night
vision
op3cs

to
assist
in
surveillance
during 












285,000

Orlando FL Public
Safety Police
In‐Car
video
cameras
for
all
patrol
vehicles.

This
will
enhance
officer
safety
and
capture
evidence
from

traffic
stops
and
vehicle
pursuits.

 










3,238,404

Orlando FL Public
Safety Protec3ve
vests
save
lives.
The
Orlando
Police
Department
u3lizes
different
types
of
vests
for
patrol
units,

criminal
inves3ga3ve
units
&
SWAT
units
all
of
which
have
manufacturers'
life
expectancies. 












150,000

Orlando FL Public
Safety Taser
technology
has
improved
over
the
years.
The
Orlando
Police
Department's
officers
currently
use
Taser

Model
M26
which
is
2003
technology.
Budget
constraints
currently
prevent
the
replacement
of
20%
of
the

department's
M26s
with
today's
model
X26. 












135,000

Orlando FL Public
Safety The
Orlando
Police
Department’s
Crime
Scene
Inves3ga3ons
Unit
has
iden3fied
new
technology
for

inves3ga3ng
crime
scenes:
a
laser
measuring
system
for
more
precise
measurements
which
is
crucial
during

court
proceedings
&
a
digital
recording
system,
Cr 












316,500

Orlando FL Public
Safety The
Orlando
Police
Department's
Forensic
Imaging
equipment
has
outlived
its
life
expectancy
&
should
any
of

the
components
fail,
our
department's
photographic
capability
regarding
latent
prints
will
be
severely

hampered.
Current
budget
constraints
hinder 












115,000

Orlando FL Public
Safety The
Orlando
Police
Department's
two
specialized
units,
Motors
&
Mounted
(Motorcycles
&
Horses)
are
vital

units
to
figh3ng
crime
in
the
City
of
Orlando.
These
units
both
u3lize
equipment
that
has
recommended

manufacture's
life
expectancy.
 












128,000

Orlando FL Public
Safety Up‐to‐date
protec3ve
equipment
is
needed
to
allow
the
Orlando
Police
Department's
training
unit
to
increase

the
realism
of
exercises
while
protec3ng
our
officers
&
dogs.
Current
budget
constraints
have
hampered
the

purchase
of
this
equipment. 














37,000

Orlando FL Public
Safety The
Orlando
Police
Department
is
implemen3ng
a
new
crime
figh3ng
and
preven3on
tool,
IRIS
(Innova3ve

Response
to
Improve
Technology).
This
project
uses
camera
technology
to
prevent,
detect,
and
respond
to

crime
throughout
the
City
of
Orlando.
 












500,000
 1
Orlando FL Public
Safety The
Orlando
Police
Department
has
employed
various
methods
&
tac3cs
in
an
effort
to
reduce
violent
crime.

The
addi3on
of
two
sworn‐officers
in
our
busiest
areas
would
allow
patrol
units
to
increase
the
number
of
self‐
ini3ated
ac3ons
 












250,000
 2
Orlando FL Schools Audubon
Park
Relie‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














84,000
 5
Orlando FL Schools Blankner
K‐8
Schoo‐Consolidate
Fire
Alarm
System
(Gym
and
Main
Building)
to
ehance
safety
and
security. 














40,000
 5
Orlando FL Schools Carver
Facility
Accessibility
(ADA)
campus
modifica3ons 














20,000
 5
Orlando FL Schools Eagle's
Nest
Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














75,000
 5
Orlando FL Schools Eccelston
ES
ES
Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














52,000
 5
Orlando FL Schools Engelwood
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














65,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
Orlando FL Schools Grand
Avenue
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














65,000
 5
Orlando FL Schools Hillcrest
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
children

while
travelling
to
and
from
school. 














25,000
 5
Orlando FL Schools Howard
MS‐Facility
Accessibility
(ADA)
campus
modifica3ons,
repave
drives,
parking
lot
and
sidewalks
to

enhance
safety,
security
and
accessiblity. 












105,000
 5
Orlando FL Schools Ivey
Lane
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














65,000
 5
Orlando FL Schools Lake
Como
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














52,000
 5
Orlando FL Schools Lake
Silver
ES‐Replace
aging
sewerage
lib
sta3on,

repave
drives
and
parking
areas,
and
perform
upgrades
to

HVAC
in
selected
buildings
to
enhance
campus
safety,
security,
and
efficiency.

Replace
DX
units
(12
small) 












210,000
 5
Orlando FL Schools Lake
Silver
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














35,000
 5
Orlando FL Schools Odyssey
MS‐Computer
Server
Room
HVAC
and
Electrical
Upgrade
to
upgrade
the
school
compu3ng

environment. 














45,000
 5
Orlando FL Schools Richmond
Heights
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety

of
children
while
travelling
to
and
from
school. 














54,000
 5
Orlando FL Schools Rock
Lake
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of

children
while
travelling
to
and
from
school. 














65,000
 5
Orlando FL Schools Washington
Shores
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety

of
children
while
travelling
to
and
from
school. 














45,000
 5
Orlando FL Schools Catalina
ES
(old)‐Parking
and
sidewalk
improvements,
restroom
upgrades
to
ADA
standards,
HVAC
upgrades

and
site
improvements
to
facilitate
con3nued
District
use
of
this
obsolete
facility. 












120,000
 8
Orlando FL Schools Cherokee
School
ES‐Replace
aging
sewerage
lib
sta3on,

repave
parking
areas,
and
upgrade
HVAC
system
to

enhance
safety,
security,
and
efficiency. 












275,000
 8
Orlando FL Schools Dover
Shores
ES‐Re‐pave
drives,
parking
areas,
and
sidewalks
to
enhance
campus
safety. 














32,000
 8
Orlando FL Schools Audubon
Park
(old)
ES‐Replace
and
upgrade
exis3ng
aged
and
failing
sewerage
lib
sta3on. 














75,000
 10
Orlando FL Schools Howard
MS‐Replace
and
upgrade
exis3ng
aged
and
failing
sewerage
lib
sta3on. 














75,000
 10
Orlando FL Schools Boone
HS‐Re‐pave
drives,
parking
areas,
and
sidewalks
to
enhance
campus
safety. 














65,000
 12
Orlando FL Schools Eccelston
ES‐Replace
the
roof
on
Building
#12 












200,000
 12
Orlando FL Schools Engelwood
ES‐Replace
obsolete
technology
spine
to
allow
installa3on
of
computers
in
classrooms
to
facilitate

an
enhanced
learning
environment.. 












501,000
 12
Orlando FL Schools Jones
HS‐Kitchen
equipment
and
addi3onal
Freezer,
Cooler,
and
Dry
Storage
Space
to
support
the
Central

Kitchen
Concept
which
will
enhance
overall
food
service
quality
and
efficiency. 










2,000,000
 12
Orlando FL Schools Magic
Way‐Driveway
and
Parking
Lot
Pavement
and
Sidewalk
enhancement
to
promote
safety
at
this
OCPS

Facili3es
Services
loca3on. 










1,800,000
 12
Orlando FL Schools Stonewall
Jackson
MS‐Perform
repairs
to
roofs
approaching
end
of
an3cipated
life
to
ensure
a
quality
learning

environment
for
the
students
and
staff
and
prolong
the
life
of
the
facility. 












250,000
 12
Orlando FL Schools Northlake
Park
ES‐Security
Enhancements
to
facilitate
compliance
with
Jessica
Lundsford
Act
in
this
school

which
is
co‐located
with
the
YMCA. 












350,000
 14
Orlando FL Schools Azalea
Park
ES‐Replace
exis3ng
offsite
water
main
with
larger
line
to
achieve
required
fire
flow. 












500,000
 15
Orlando FL Schools Citywide‐All‐Classroom
Technology
Installa3on/Upgrade
to
ensure
the
classroom
learning
environment
at
all

exis3ng
schools
within
Orlando
meet
district
standards
in
terms
of
audio
enhancement,
video
projec3on
and

whiteboards
to
equitably
meet
the
educat 










1,040,000
 15
Orlando FL Schools Citywide‐All‐Network
infrastructure
enhancements
to
upgrade
all
exis3ng
schools
within
Orlando
to
current

standards
to
meet
the
educa3onal
needs
of
all
students,
faculty
and
administrators. 








18,000,000
 15
Orlando FL Schools Citywide‐All‐Server
Virtualiza3on
to
upgrade
the
school
compu3ng
environment
at
all
exis3ng
schools
within

Orlando
to
current
standards
to
meet
the
educa3onal
needs
of
all
students,
faculty
and
administrators. 










1,040,000
 15
Orlando FL Schools Citywide‐All‐Site
Security
Fencing
Enhancement
Program
to
ensure
compliance
with
Jessica
Lunsford
Act

requirement
that
all
campuses
be
secure
from
intrusion. 










1,650,000
 15
Orlando FL Schools Edgewater
HS‐Sidewalk
infrastructure
improvements
along
Maurey
Rd
to
enhance
safety
of
students
while

travelling
to
and
from
school. 










1,100,000
 15
Orlando FL Schools Citywide‐All‐School
Bicycle/Pedestrian
enhancements
to
facilitate
the
convenient
use
of
alterna3ves
to
internal

combus3on
engine
powered
modes
of
transporta3on
to
move
students
to
and
from
the
schools.

This
would

include
sidewalk/biketrail
improvement 










2,500,000
 16
Orlando FL Schools Jones
HS/Howard
MS/McCoy
ES‐All‐Site
Ligh3ng
LED
Ligh3ng
Test
Program
to
replace
exis3ng
incandesant

ligh3ng
with
new
high
efficiency
LED
ligh3ng. 










3,750,000
 18
Orlando FL Schools Odyssey
MS
Relief
MS‐Construct
Narcoossee
Roadway
and
Sidewalk
improvements
to
facilitate
safe
and

efficient
movement
of
students
into
this
new
school
site. 










2,300,000
 20
Orlando FL Schools Citywide‐All‐Classroom
Computer
Installa3on/Upgrade
to
ensure
the
classroom
compu3ng
environment
at
all

exis3ng
schools
within
Orlando
meet
district
standards
in
terms
of
computer
availability
and
up‐to‐date

sobware
to
meet
the
educa3onal
needs
 










6,520,000
 30
Orlando FL Schools Jones
HS‐New
school
Stadium
(Football/Track)
at
the
exis3ng
prac3ce
field
facility
with
new
Bleachers,
Fieled

House,
Restrooms,
and
Concessions
Stands
to
allow
all
School
athle3c
ac3vi3es
to
occur
on‐campus
rather

than
in
the
Citrus
Bowel. 










3,800,000
 30
Orlando FL Schools Audubon
Park
(old)
ES‐Parking
and
sidewalk
improvements,
restroom
upgrades
to
ADA
standards,
and
HVAC

upgrades
to
facilitate
con3nued
District
use
of
this
obsolete
facility. 














36,050
 32
Orlando FL Schools Dr.
Phillips
HS‐Replace
Chilled
Water
Lines
throughout
the
campus.

Replace
Air
Handler
Units
and
controls.


Replace
Chillers
#2
&
#3.

Replace
Cooling
Tower. 










2,350,000
 36
Orlando FL Schools Rosemont
ES
Comprehensive‐Add
Outside
Air
to
Classroom
HVAC
Systems,
Replace
Kitchen
Grease
Traps
and

Fans,
Upgrade
Classroom
Technology,
Repair
Roofing 










3,951,360
 40
Orlando FL Schools Rosemont
ES‐Portable
Replacement
project
to
replace
old
portable
classrooms
with

permanent
construc3on

to
enhance
student
learning
environment
and
eliminate
portable
classrooms. 










4,800,000
 115
Orlando FL Schools Boone
HS‐Portable
Replacement
project
to
replace
old
portable
classrooms
with

permanent
construc3on 










7,000,000
 150
Orlando FL Schools Dr.
Phillips
9th‐Portable
Replacement
project
to
replace
old
portable
classrooms
with

permanent
construc3on

to
enhance
the
learning
environment,
safety,
and
security. 








28,000,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Orlando FL Schools Nap
Ford
Community
School‐
construc3on
of
permanent
building 








25,378,000
 300
Orlando FL Schools Shingle
Creek
ES‐Replacement
of
modular
classrooms
with
permanent
classrooms
which
may
include
New

Classroom
Buildings
,
Administra3ve
Addi3on,
Remodel
Cafeteria,
Media
Center,
Upgrade
Classrooms,
Replace

HVAC
System,
Replace
Fire
alarm
System 








23,580,821
 300
Orlando FL Schools Orange
Center
ES‐Administra3ve
Addi3on,
Remodel
Classroom
Building,
Remodel
Media
Center
and
Cafeteria,

Build
a
new
Central
energy
Plant. 








12,134,438
 310
Orlando FL Schools Azalea
Park
ES
Replacement‐Comprehensive
school
renova3on
to
meet
current
educa3onal
adequacy,
and

enhance
security,
technology,
and
efficiency. 








19,724,896
 325
Orlando FL Schools Odyssey
MS‐Construct
a
Relief
School
for
the
overcrowded
Odyssey
MS
to
enhance
the
student
learning

environment
and
eliminate
portable
classrooms. 








40,136,583
 500
Orlando FL Schools Edgewater
HS‐Comprehensive
school
renova3on
to
meet
current
educa3onal
adequacy,
and
enhance
security,

technology,
and
efficiency. 








84,318,523
 750
Orlando FL Streets/Roads Shingle
Creek
Trail‐Cri3cal
1000
foot
segment
of
a
paved
mul3‐use
trail
that
is
part
of
overall
regional
trail

network
providing
access
to
mul3ple
schools
and
employment
areas. 












110,000
 4
Orlando FL Streets/Roads Regional
Transit
Center
Parking
Lot
Located
adjacent
to
LYNX
Central
Sta3on
and
due
to
its
ideal
loca3on,
will

provide
a
significant
benefit
to
LYNX
employees,
guests,
visitors,
etc.,
and
will
ul3mately
be
a
hub
for
future
rail

expansion,
Commuter
Rail 












425,000
 15
Orlando FL Streets/Roads Raleigh
Street
Conges3on
Management
‐
The
roadway
on
the
west
side
of
the
City
of
Orlando
con3nues
to

experience
conges3on
and
safety
problems
as
it
accommodates
over
16,000
Daily
Trips
on
a
two‐lane
roadway

that
lacks
leb
turn
lanes.
 












475,000
 18
Orlando FL Streets/Roads SR
50
/Downtown
Orlando
‐
Conges3on
Management
Improvements
‐
The
improvements
will
op3mize
traffic

flow
and
reduce
cut‐through
traffic
in
Downtown
Core
Neighborhoods.

The
project
consists
of
addi3onal
turn

lanes
approaching
SR
50
(Colonial
Dr)
at
the 












475,000
 18
Orlando FL Streets/Roads Neighborhood
Sidewalk
Ini3a3ve
‐The
Surface
Transporta3on
Policy
Project
ranked
Metro
Orlando
as
having

the
"Meanest
Streets"
in
2004.

The
City
has
been
trying
to
improve
the
safety
of
pedestrians
with
Sidewalk

Projects
in
the
Urban
Core
 












970,000
 36
Orlando FL Streets/Roads Medical
City
and
VA
Hospital
Traffic
Signal/ITS
Interconnect
‐
The
Medical
City
Part
of
Orlando
is
the
future

home
of
Central
Florida,
VA
Hospital
and
the
UCF
Medical
School.

The
installa3on
of
fiber
op3c

communica3ons
along
key
corridors 










1,095,000
 41
Orlando FL Streets/Roads Pine
Street
Extension
The
extension
of
a
2‐lane
downtown
street
and
the
two‐waying
of
an
adjacent
Pine

Street
segment
are
necessary
for
adequate
traffic
circula3on
in
Downtown
Orlando.

Collector
level
traffic

circula3on
has
been
impacted
 










1,200,000
 45
Orlando FL Streets/Roads LYNX
Central
Commuter
Rail
Sta3on
‐
Located
north
of
Livingston
St.
in
Downtown
Orlando
adjacent
to
the

Downtown
Bus
Terminal
providing
quick
and
easy
mode
change
to
the
regional
bus
network.
Sta3on

enhancements
include
10
b.
walkways
 










1,500,000
 56
Orlando FL Streets/Roads Audubon
Park
Main
Street
District
Streetscape‐
Transporta3on
Enhancement
project
including
design
and

build
out
of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and

underground
u3li3es.
 










5,500,000
 59
Orlando FL Streets/Roads Amtrak/ORMC
Commuter
Rail
Sta3on
‐
Located
just
south
of
Downtown
Orlando,
provides
quick
and
easy

mode
change
to
Amtrak,
the
region's
exis3ng
train
service,
and
provides
service
to
another
leading
employer,

Orlando
Regional
Medical
Center 










2,000,000
 74
Orlando FL Streets/Roads Church
Street
Commuter
Rail
Sta3on‐Located
in
the
heart
of
Downtown
Orlando,
adjacent
to
the
exis3ng

Downtown
landmark
Church
Street
Sta3on,
providing
service
to
the
core
of
the
Downtown
business
area,
all

major
government
buildings,
senior
high‐rise
housing 










2,700,000
 100
Orlando FL Streets/Roads Florida
Hospital
Commuter
Rail
Sta3on
‐
Located
just
north
of
Downtown
Orlando
within
walking
distance
of

Lake
Ivanhoe
and
Loch
Haven
Park
and
will
serve
one
of
the
largest
employers
in
Central
Florida,
Florida

Hospital. 










2,800,000
 104
Orlando FL Streets/Roads Boone
Avenue
Extension‐While
the
recently
completed
I‐4/SR
408
Interim
Interchange
project
has
improved

limited
access
interstate
mobility,
it
has
resulted
in
less
collector
network
mobility
for
Downtown
Orlando. 










3,020,000
 112
Orlando FL Streets/Roads Ivanhoe
Village
Main
Street
District
Streetscape‐
Transporta3on
Enhancement
project
including
design
and

build
out
of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and

underground
u3li3es.
 








12,000,000
 128
Orlando FL Streets/Roads Edgewater
Drive
Main
Street
District
Streetscape‐Transporta3on
Enhancement
project
including
design
and

build
out
of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and

underground
u3li3es. 








16,500,000
 176
Orlando FL Streets/Roads Downtown
South
Main
Street
District
Streetscape‐
Transporta3on
Enhancement
project
including
design
and

build
out
of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and

underground
u3li3es.
 








23,000,000
 246
Orlando FL Streets/Roads Downtown
Orlando
ITS
Network‐This
project
consists
of
the
expansion
of
the
Intelligent
Transporta3on
System

throughout
Downtown
Orlando.
The
ITS
technology
uses
new
technology
to
provide
conges3on
management

and
incident
management
capability.
 










6,770,000
 252
Orlando FL Streets/Roads Mills
50
Main
Street
District
Streetscape‐
Transporta3on
Enhancement
project
including
design
and
build
out

of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and
underground

u3li3es.
 








33,000,000
 353
Orlando FL Streets/Roads Mission
Road
Part
2
This
cri3cal
0.7
mile
segment
of
the
4‐lane
divided
minor
arterial,
Mission
Road
Project

includes
the
0.4
mile
comple3on
of
Metrowest
Boulevard.

The
roadway
will
serve
as
an
alternate
north/south

route
 








11,503,000
 428
Orlando FL Transit Bus
Rapid
Transit
System
–
Bus
Replacement:
The
exis3ng
Downtown
Bus
Rapid
Transit
circulator
connects
the

Downtown
Central
Business
District
Core,
City
Hall,
Amway
Arena,
and
the
Orange
County
Courthouse
to
LYNX

Central
Sta3on,
which
will
also
serve
as
a
future
Commuter
Rail
Sta3on.

The
route
has
been
a
major
success,

with
ridership
levels
consistently
reaching
4,500
per
day,
100,000
per
year
over
the
last
decade.
The
exis3ng

buses
have
reached
their
mileage
limits
and
need
to
be
replaced
to
con3nue
providing
the
outstanding

services
to
the
residents,
visitors,
and
employees
within
Downtown
Orlando.
Ten
(10)
buses
are
required
to
be

replaced
and
4
(four)
new
buses
will
be
added
to
the
fleet
to
improve
headways.












7,000,000
 260
Orlando FL Water Clear
Lake
Area
‐Lib
Sta3on
57
Rehabilita3on 












100,000
 10
Orlando FL Water Englewood
Park
Area‐
Lib
Sta3on
16
Rehabilita3on 












100,000
 10
Orlando FL Water Holden
Heights
Area‐Lib
Sta3on
18
Rehabilita3on 












100,000
 10
Orlando FL Water Lake
Breeze
Drive
Sanitary
Sewers 










1,200,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Orlando FL Water Lake
Dot/Hughey
Avenue
Retrofit‐ 










1,800,000
 10
Orlando FL Water Lake
Monterey
Area‐Lib
Sta3on
27
Reloca3on 












750,000
 10
Orlando FL Water Lake
Sunset
Area‐Lib
Sta3on
54
Rehabilita3on
Convert
type
lib
sta3on
to
submersible
pump
type
lib
sta3on
to

address
age,
maintenance
and
safety
concerns. 












100,000
 10
Orlando FL Water Malibu
Groves
Area‐Lib
Sta3on
60
Rehabiliata3on 












100,000
 10
Orlando FL Water Oakley
St./Pine
Bluff
Drainage
Improvements‐ 










1,000,000
 10
Orlando FL Water Richmond
Heights
Area‐Lib
Sta3on
65
Rehabilita3on 












100,000
 10
Orlando FL Water Rio
Grande
Park
Area‐Lib
Sta3on
28
Rehabilita3on 












100,000
 10
Orlando FL Water Silver
Star
Area‐Lib
Sta3on
41
Rehabilita3on 












100,000
 10
Orlando FL Water Silver
Star
Road
FM
Project 










1,300,000
 10
Orlando FL Water Solandra
Drive
Area‐Sanitary
Sewer‐ 












750,000
 10
Orlando FL Water Water
Pipeline
Replacement‐Lake
Holden
Terrace/Albert
Shores 












885,000
 10
Orlando FL Water Water
Pipeline
Replacement‐Narcoossee
Road
Widening‐Boggy
Creek
Road
to
SR
417 












640,500
 10
Orlando FL Water Water
Pipeline
Replacement‐Robinson
Avenue
from
Primrose
Drive
to
Mills
Avenue 










1,400,000
 10
Orlando FL Water Water
Pipeline
Replacement‐SR
482
Sand
Lake
Road
from
Presidents
Drive
to
S.
Orange
Blossom
Trail 










2,524,192
 10
Orlando FL Water Water
Pipeline
Replacement‐SR
50‐
Good
Homes
Road
to
Pine
Hills
Road 












432,947
 10
Orlando FL Water West
Colonial
Area‐Lib
Sta3on
35
Rehabilita3on 












100,000
 10
Orlando FL Water Lake
Eola
Upgrade 










1,000,000
 15
Orlando FL Water Parramore
Heritage
Park
Water
Reten3on 










3,000,000
 25
Palm
Bay FL Public
Safety A
school
resource
office
is
needed
for
the
new
high
school,
opening
in
August
2008 














75,000
 1
Palm
Bay FL Public
Safety Staff
is
needed
to
fully
operate
the
Automated
Fingerprint
Iden3fica3on
System. 














50,000
 1
Palm
Bay FL Public
Safety With
over
100,000
square
miles
and
100,000
popula3on,
the
City
needs
a
fully
equipped,
high‐tech,
mobile

command
center
to
respond
to
natural
(hurricanes,
tornadoes,
wildfires)
and
other
large‐scale
emergencies. 












875,000
 2
Palm
Bay FL Public
Safety Palm
Bay
has
developed
and
implemented
a
Local
DNA
Indexing
System
(LODIS)
that
has
been
highly
successful

in
solving
local
and
regional
crimes.
Funding
is
needed
for
con3nued
implementa3on,
evalua3on
and

enhancement
of
the
program. 












350,000
 4
Palm
Bay FL Streets/Roads Sidewalk
program
‐
19
sidewalk
projects
primarily
serving
school
areas 










2,000,000
 60
Palm
Bay FL Streets/Roads US
1
streetscaping,
ligh3ng,
signaliza3on 










5,400,000
 150
Palm
Bay FL Streets/Roads Road
reconstruc3on
of
approximately
137
miles
of
failed
residen3al
streets,
17
miles
of
failing
collectors
and

resurfacing
of
547
miles
of
deteriora3ng
residen3al
streets
and
66
miles
of
deteriora3ng
collectors 








70,000,000
 1950
Palm
Bay FL Water Water
distribu3on
system
in
Port
Malabar
Units
12,
16
and
22
to
serve
approximately
5350
residen3al
units. 








13,300,000
 370
Pembroke
Pines FL CDBG Construc3on
of
a
restroom
facility
and
sidewalks
at
Walter
C.
Young
Resource
Center
Athle3c
Complex 












175,000
 15
Pembroke
Pines FL CDBG Sports
ligh3ng
&
field
renova3on
at
Silver
Palms
Elementary
School 












450,000
 18
Pembroke
Pines FL CDBG Construc3on
of
a
central
storage
facility 










1,800,000
 25
Pembroke
Pines FL CDBG Construc3on
of
a
special
popula3ons
center 










1,000,000
 30
Pembroke
Pines FL CDBG Pines
Recrea3on
Teen
Center
Building 










1,000,000
 30
Pembroke
Pines FL CDBG Construc3on
of
soccer
fields
with
sports
ligh3ng
at
West
Pines
Soccer
Park
&
Nature
Preserve 










2,000,000
 40
Pembroke
Pines FL CDBG Amphitheater
(3,000
seats) 










5,000,000
 50
Pembroke
Pines FL CDBG Miscellaneous
improvements
to
32
parks 










2,000,000
 50
Pembroke
Pines FL CDBG Parks 










3,000,000
 50
Pembroke
Pines FL CDBG Civic
Center 








10,000,000
 75
Pembroke
Pines FL CDBG New
City
Hall 








14,500,000
 75
Pembroke
Pines FL CDBG Installa3on
of
south
of
Pines
Boulevard,
north
of
Pembroke
Road,
west
of
the
Florida

gravity
sewer
lines
and

lib
sta3ons
in
the
por3on
of
the
city
Turnpike
and
east
of
SW
72
Avenue 








30,000,000
 100
Pembroke
Pines FL CDBG New
Public
Services
Facility 








15,000,000
 150
Pembroke
Pines FL Energy Add
thermal
storage
units
to
the
air
cooled
15‐ton
DX
units
to
reduce
energy
consump3on
at
peak
periods
to

the
5
Senior
Residences
buildings
2‐15
ton
units/building 










1,000,000
 8
Pembroke
Pines FL Energy Tie
Water
heaters
to
AC
heat
exchange
for
more
efficient
opera3on
of
both
AC
&
water
heat
exchange
unit.
Pre

heats
reduces
costs
and
extends
equipment
life
for
880
units
@
$1200.00
per
unit 










1,056,000
 10
Pembroke
Pines FL Energy Upgrade
the
3500
street
lights
owned
by
the
city
to
high
efficiency
ligh3ng.
Each
light
costs
$100.00
to
upgrade













350,000
 10
Pembroke
Pines FL Housing Tie
water
heaters
to
AC
heat
exchange
to
preheat
hot
water
for
more
efficient
opera3on
of
both
AC
and
water

heater
reducing
costs
and
increasing
equipment
life,
880
units/1,200
per
unit. 










1,056,000
 2
Pembroke
Pines FL Housing Install
thermal
storage
units
to
air
cooled
15
ton
DX
units
to
reduce
energy
consump3on
at
peak
demand

3mes,
and
u3lize
off
peak
cooling
for
Senior
Residences,
5
buildings/10
units 










1,000,000
 3
Pembroke
Pines FL Public
Safety Automo3ve
License
Plate
Scanners 












206,000

Pembroke
Pines FL Public
Safety Camera
System
for
Public
Safety
Facili3es 












130,000

Pembroke
Pines FL Public
Safety Equipment
and
Vehicles
for
Personnel 












600,000

Pembroke
Pines FL Public
Safety Lenco
Bearcat
Armor
Vehicles 












245,000

Pembroke
Pines FL Public
Safety Main
Public
Safety
Facility
Generator 












500,000

Pembroke
Pines FL Public
Safety OSSI
Records
Management
System 










1,500,000

Pembroke
Pines FL Public
Safety P25
Compliant
Radios 










1,000,000

Pembroke
Pines FL Public
Safety Patrol
Rifles 












393,000

Pembroke
Pines FL Public
Safety Pocket
Cita3on
Devices 












600,000

Pembroke
Pines FL Public
Safety Upgrades
Ballis3c
Protec3on
Vests 












393,000

Pembroke
Pines FL Public
Safety Violent
Street
Crime
Task
Force 












800,824
 8
Pembroke
Pines FL Public
Safety Crime
Suppression
Patrol
Staffing 










1,201,236
 12
Pembroke
Pines FL Schools Mobile
Computer
Labs 












240,000
 0
Pembroke
Pines FL Schools Other
Charter
School
Technology
Needs
‐
Projectors
(204) 












408,000
 0
Pembroke
Pines FL Schools Other
Charter
School
Technology
Needs
‐
Smartboards
(284) 












710,000
 0
Pembroke
Pines FL Schools Replacement
of
Charter
School
Computers
(25%) 












500,000
 0
Pembroke
Pines FL Schools VILLAGE
PRE‐K
50
LIGHT
SENSORS 















9,000
 1
Pembroke
Pines FL Schools FSU
CAMPUS
105
LIGHT
SENSORS 














20,000
 2
Pembroke
Pines FL Schools CENTRAL
CAMPUS
220
LIGHT
SENSORS 














41,000
 3
Pembroke
Pines FL Schools EAST
CAMPUS
200
LIGHT
SENSORS 














38,000
 3
Pembroke
Pines FL Schools ACADEMIC
VILLAGE
375
LIGHT
SENSORS 














70,000
 4
Pembroke
Pines FL Schools WEST
CAMPUS
390
LIGHT
SENSORS 














72,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
Pembroke
Pines FL Schools Thermal
Energy
Storage
to
improve
efficiency
of
water
cooled
chiller
and
save
energy
at
Academic
Village; 












500,000
 7
Pembroke
Pines FL Schools New
water
cooled
chiller
&
Thermal
Energy
Storage
units
to
cool
350,000
sq.
b.
and
save
energy
at
Howard
C.

Forman
Campus 










1,000,000
 10
Pembroke
Pines FL Streets/Roads Cinnamon
Place
I,
II,
III
&
IV
milling
&
resurfacing 












450,000
 10
Pembroke
Pines FL Streets/Roads Mill‐Resurface
Pasadena
98
Ave‐Palm
Avenue‐Pines
to
Johnson
St 












400,000
 10
Pembroke
Pines FL Streets/Roads Mill‐Resurface
Lakeside
Key
–
94
Ave‐Palm
Avenue
–
Pines
to
Pembroke 












500,000
 12
Pembroke
Pines FL Streets/Roads Mill‐Resurface
Rainbow
Lakes
I
&
II
–
93
Ave
–
Tab
Street 












500,000
 12
Pembroke
Pines FL Streets/Roads Mill‐Resurface
Tanglewood
–
95
Ave‐Palm
Avenue
–
Pines
to
Pembroke 












500,000
 12
Pembroke
Pines FL Streets/Roads Mill‐Resurface
University
Heights
–
91
Ave‐Tab
Street 












500,000
 12
Pembroke
Pines FL Streets/Roads NW
103
AVENUE
‐
3
street
to
Johnson
St
‐
reconstruc3on 












250,000
 15
Pembroke
Pines FL Streets/Roads SOUTH
BRIDGE
‐
All
public
roads
‐
Repaving 












400,000
 15
Pembroke
Pines FL Streets/Roads CHAPEL
TRAIL
‐
Phases
1,
2,
3
&
4
‐
repaving 










1,000,000
 20
Pembroke
Pines FL Streets/Roads NW
12
ST
‐
155
Ave
to
Dykes
Road
‐
Reconst 












300,000
 20
Pembroke
Pines FL Streets/Roads NW
155
AVENUE
‐
Pines
to
NW
12
St
‐
Reconst 












500,000
 25
Pembroke
Pines FL Streets/Roads NW
178
AVE/NW
17
ST
‐
Pines
to
184
‐
reconstruc3on 












400,000
 25
Pembroke
Pines FL Streets/Roads SW
178
AVENUE
‐
Pembroke
to
Pines
‐
reconstruc3on 












450,000
 25
Pembroke
Pines FL Streets/Roads WASHINGTON
STREET
‐
Palm
Av
to
Hiatus
Rd
‐
Reconst 












400,000
 25
Pembroke
Pines FL Streets/Roads Washington
Street
‐
SW
114
Av
to
Flamingo
Rd
‐
Reconstruc3on 












400,000
 25
Pembroke
Pines FL Streets/Roads 196
AVENUE
‐
Pines
to
Tab
‐
Reconst 










2,000,000
 30
Pembroke
Pines FL Streets/Roads 209
AVENUE
‐
Tab
Street
to
Johnson
US
27
‐
Reconst 










1,200,000
 30
Pembroke
Pines FL Streets/Roads Hiatus
Road
–
Johnson
Street
to
Sheridan
Street
–
Milling
&
Resurfacing 










1,250,000
 35
Pembroke
Pines FL Streets/Roads JOHNSON
STREET
‐
196
Ave
to
US
27
‐
Reconst 










2,500,000
 35
Pembroke
Pines FL Streets/Roads JOHNSON
STREET
‐
NW
76
Avenue
to
Hiatus
Road
‐
Reconst 










3,000,000
 35
Pembroke
Pines FL Streets/Roads TAFT
STREET
‐
Palm
Ave
to
Flamingo
Road
‐
Reconst 










2,500,000
 35
Pembroke
Pines FL Streets/Roads SW
72
AVENUE
‐
Pembroke
to
Pines
‐
reconstruc3on 










1,150,000
 40
Pembroke
Pines FL Streets/Roads TAFT
ST‐186
AVE
‐
Pines
to
196
Avenue 










3,000,000
 40
Pembroke
Pines FL Streets/Roads PALM
AVENUE
‐
Pines
to
Pembroke,
Johnson
to
Sheridan
‐
Reconst 










2,000,000
 50
Pembroke
Pines FL Streets/Roads 196
AVENUE
‐
Pembroke
to
Pines
‐
New
Road 










4,500,000
 60
Pembroke
Pines FL Streets/Roads PEMBROKE
ROAD
‐
186
Avenue
to
202
Avenue
‐
New
road 










4,500,000
 60
Pembroke
Pines FL Transit Replacement
of
City
Transporta3on
Fleet
Buses
(6) 












450,000
 0
Pembroke
Pines FL Transit Provide
a
transporta3on
system
for
City
residents
and
for
those
who
work
in
the
City.

The
service
will
include

transporta3on
between
a
centrally
located
Transit
Hub,
where
individuals
will
be
dropped
off
from
County
or

private
transporta3on
vehicles. 










1,053,724
 16
Pembroke
Pines FL Water Lib
Sta3on
30
Replacement 












160,000
 5
Pembroke
Pines FL Water Lib
Sta3on
32
Replacement 












160,000
 5
Pembroke
Pines FL Water Lib
Sta3on
9
Replacement 












160,000
 5
Pembroke
Pines FL Water Replace
Lib
Sta3on
5‐
Line
Wetwell
and
10
upstream
manholes 












120,000
 10
Pembroke
Pines FL Water Replace
Lib
Sta3on
6‐
Line
Wetwell
and
10
upstream
manholes 












120,000
 10
Pembroke
Pines FL Water 16"
Waterline
Replacement
at
Waterplant 












400,000
 20
Pembroke
Pines FL Water Inflow/Infiltra3on
Lib
Sta3ons
12 












500,000
 20
Pembroke
Pines FL Water Inflow/Infiltra3on
Lib
Sta3ons
13 












500,000
 20
Pembroke
Pines FL Water Inflow/Infiltra3on
Lib
Sta3ons
16 












500,000
 20
Pembroke
Pines FL Water Inflow/Infiltra3on
Lib
Sta3ons
17 












500,000
 20
Pembroke
Pines FL Water SW
178
Forcemain
Replacement 












500,000
 20
Pembroke
Pines FL Water Design
and
permiqng
of
a
new
sewer
plant 








15,000,000
 25
Pembroke
Pines FL Water SW
72
Avenue
Waterline
Replacement 












800,000
 25
Pembroke
Pines FL Water Rehabilita3on
Plants
1‐2
Wastewater
Plant 










2,000,000
 30
Pembroke
Pines FL Water Refurbish
Master
List
Sta3on
4
(Pumps,
piping,
electrical)
and
line
upstream
manholes 










1,200,000
 100
Pembroke
Pines FL Water Replacement
of
40‐50
year
old
waterlines
between
72
Ave
and
Turnpike
(mul3ple
phases
to
be
completed
in

one
year) 








30,000,000
 100
Pinecrest FL Streets/Roads Citywide
Roadway
Resurfacing
Project 










7,000,000
 50
Pinecrest FL Water Pinecrest
Gardens
Wastewater
System 












150,000
 5
Pinecrest FL Water Stormwater
Drainage
Project 












600,000
 30
Pinecrest FL Water Waterline
Expansion
Project 








12,500,000
 100
Pinellas
Park FL CDBG Sanitary
Sewer
Libsta3on
Replacemenmts
#9,
#23,
#40 












492,500
 3
Pinellas
Park FL CDBG Homeland
Subdivision
Potable
Water
Distribu3on
System 












895,000
 6
Pinellas
Park FL CDBG Homeland
Subdivision
Reclaimed
Water
Distribu3on
System 










1,000,000
 7
Pinellas
Park FL CDBG Sanitary
Sewer
Libsta3on/Force
Main
Improvements
&
Sewer
Extensions 










1,600,140
 11
Pinellas
Park FL CDBG Homeland
Subdivision
Drainage
System
‐
To
upgrade
the
exis3ng
rural
standard
open
drainage
swales
to
a

modern
URBAN
system.

This
will
provide
150+
residents
and
businesses
with
enhanced
drainage
capabili3es

and
flood
protec3on.

Addi3onally,
sidewalk 










3,200,000
 22
Pinellas
Park FL CDBG Longhill
Drive
Drainage
Improvements 










4,245,835
 30
Pinellas
Park FL Energy Energy
‐
Energy
Efficiency
Improvements
at
City
Office
Buildings 










1,000,000
 7
Pinellas
Park FL Public
Safety Emergency
Management
‐
Harden
Technical
Services
Building

‐

To
Afford
the
Public
Works
Administra3on

Addi3onal
Shelter
Space
and
a
centralized
PW
Opera3ons
EOC 










1,000,000
 7
Pinellas
Park FL Streets/Roads Transporta3on
‐
Traffic
Signaliza3on
Improvements
at
124th
Avenue
and
Belcher
Road 












300,000
 2
Pinellas
Park FL Streets/Roads Transporta3on
‐
Installa3on
of
Sidewalks
and
ADA
Enhancements
to
Promote
Walking
and
Help
Reduce
Vechile

Trips 












500,000
 4
Pinellas
Park FL Streets/Roads Transporta3on
‐
Public
Parking
Lot
at
the
Pinellas
Park
Performing
Arts
Center
(Downtown) 












500,000
 4
Pinellas
Park FL Streets/Roads Transporta3on
‐
Traffic
Signaliza3on
at
40th
St.
and
Gateway
Blvd. 












523,000
 4
Planta3on FL CDBG Move
approximately
2
miles
of
overhead
u3lity
lines
underground
to
promote
electric
reliability
and
economic

security
in
our
community.
This
would
enhance
reliability,
reduce
frequency
and
severity
of
outages
due
to

hurricanes,
reduce
opera3ng
and
maint 










2,000,000
 15
Planta3on FL CDBG North
Acres
Park
Development
to
include
wetlands,

boardwalk,
picnic
structures,
restrooms
and
playground

equipment. 










1,200,000
 15
Planta3on FL CDBG Renova3on
and
expansion
of
an
exis3ng
community
center
that
would
be
used
primarily
for
senior
programs

and
ac3vi3es 










2,500,000
 20
Planta3on FL Energy Energy
saver
pool
cover
system
to
minimize
heat
loss
and
reduce
water
costs
and
preserve
chemicals. 














50,000
 1
City State Program Project
Descrip3on Funding
Required Jobs
Planta3on FL Energy Install
(4)
1350
gallon
water
tanks
to
collect
rain
water
for
re‐use
as
make‐up
water
for
(1)
olympic
size
pool. 














15,000
 1
Planta3on FL Energy Variable
Frequency
Drive
(VFD)
and
chemical
controller
for
pool
pump
motor
protec3on
and
energy
savings
to

interface
with
systems
controler. 














25,000
 1
Planta3on FL Energy Conversion
of
100
city
vehicles
to
CNG
and
construc3on
of
a
CNG
refueling
sta3on. 












750,000
 5
Planta3on FL Energy Install
150
solar
walkway
lights
for
pathways
within
five
city
parks. 












180,000
 5
Planta3on FL Energy Methane
Gas
Conversion‐Methane
gas
is
a
by‐product
from
trea3ng
wastewater.
The
gas
would
be
cleaned,

scrubbed,
and
compressed
to
be
used
as
electric
power
to
operate
equipment
in
the
wastewater
plant 










1,500,000
 10
Planta3on FL Public
Safety Strengthen
a
400
foot
Public
Safety
communica3ons
tower
to
enable
installa3on
of
addi3onal
Public
Safety

antennas
and
cameras. 














25,000
 2
Planta3on FL Public
Safety Upgrade
current
public
safety
radio
system 












232,000
 2
Planta3on FL Public
Safety Mobile
Command
Unit 












500,000
 3
Planta3on FL Public
Safety In‐car
dash
cameras
(175@$5,500) 












962,500
 4
Planta3on FL Public
Safety Five
addi3onal
police
officers
and
equipment
to
create
Special
Opera3on
Crimes
Unit 












500,000
 5
Planta3on FL Public
Safety Purchase
replacement
100+
foot
aerial
apparatus 










1,200,000
 5
Planta3on FL Public
Safety Relocate
Public
Safety
Dispatch
into
more
secure
area
of
Police
Department
Building. 












113,000
 5
Planta3on FL Public
Safety Construct
a
for3fied
bunker
to
house
all
Informa3on
Technology
servers
and
associated
hardware
for
all
city

equipment
including
Police,
Fire
and
Emergency
Management.

Facility
will
also
be
used
for
addi3onal
office

space,
general
storage,
etc. 










2,350,000
 15
Planta3on FL Public
Safety Create
a
city‐wide
WiFi
network
to
enable
Public
Safety
(Police,
Fire
and
EMS)
to
access
the
wireless
network

for
Computer
Aided
Dispatch
and
to
access
and
create
data
in
the
field. 








22,000,000
 15
Planta3on FL Public
Safety Fire
Sta3on
#1.
Replace
exis3ng
aging
sta3on
with
a
12,000
sq
b
structure
with
four
aparatus
bays 










4,000,000
 25
Planta3on FL Public
Safety Fire
Training
Center
with
four
aparatus
bays
12,000
sqare
feet 










4,000,000
 25
Planta3on FL Streets/Roads Construct
a
vehicular
bridge/pedestrian
crossing
to
replace
an
exis3ng
bridge
connec3ng
a
park
with
a

school/parking
lot. 










1,000,000
 10
Planta3on FL Streets/Roads Resurface
35
residen3al
streets
in
the
Sunrise
Heights
and
Mirror
Lake
subdivisions
using
mill
and
recycling

pavement
process. 










1,350,000
 10
Planta3on FL Streets/Roads Replace
2.5
miles
of
concrete
and
grass
drainage
swales
damaged
or
destroyed
due
to
age
(35‐40
yrs)
with

drainage
pipe
infrastructure. 










1,700,000
 15
Planta3on FL Transit Construc3on
of
transit
stops
in
Midtown
Planta3on
including
various
signage
and
wayfinding
signage. 












140,000
 3
Planta3on FL Transit Construct
a
500
space
park
and
ride
parking
facility
that
would
connect
with
trolley
transporta3on
in
Midtown

Planta3on,
Broward
County
Transit
and
proposed
FDOT
rapid
transit
along
the
I‐595
corridor. 








12,500,000
 100
Planta3on FL Transit Rehabilita3on
of
exisi3ng
roadways
(NW
84th
Avenue
and
NW
78th
Avenue)
into
Transit
Greenways
providing

narrower
streets,
pedestrian
and
bicycle
walkways
and
paths
with
street
furniture 










6,900,000
 100
Planta3on FL Water Storm
water
protec3on
project
that
would
reinforce,
extend
and
enhance
an
exis3ng
berm
providing

stormwater
protec3on
to
Planta3on
Acres. 












800,000
 5
Planta3on FL Water Pine
Island
Park
drainage
improvement
project
for
playing
fields
and
parking
lots. 










1,800,000
 10
Planta3on FL Water Regional
wastewater
treatment
plant,
prelimminary
treatment
building
rehabilita3on 










1,545,000
 10
Planta3on FL Water Regional
wastewater
treatment
plant,
primary
odor
control
system
rehabilita3on 










1,750,000
 10
Planta3on FL Water Potable
water
distribu3on
system
Planta3on
Park
water
main
rehabilita3on
project 










3,000,000
 20
Planta3on FL Water Sanitary
sewer
collec3on
system
rehab,
Planta3on
Gardens,
Phase
II 










8,300,000
 45
Port
St.
Lucie FL CDBG Tiffany
Pumpsta3on
Upgrade
for
Drainage 










1,500,000
 10
Port
St.
Lucie FL CDBG Boat
Launching
Park 










3,500,000
 15
Port
St.
Lucie FL CDBG Florresta
Pines
Drainage
Improv. 












800,000
 20
Port
St.
Lucie FL CDBG Botanical
Gardens
Facility 










3,000,000
 25
Port
St.
Lucie FL CDBG SW
Neighborhood
Park 










3,750,000
 25
Port
St.
Lucie FL CDBG Village
Green/Hog
Pen
Slough
Drainage
Improvments 










1,500,000
 25
Port
St.
Lucie FL CDBG ParksEdge
Road
Drainage
Improvements 












800,000
 30
Port
St.
Lucie FL CDBG Drainage
Improvements
for
Calmosa,
Lakehurst,
Cur3s
&
Lucera 










2,000,000
 40
Port
St.
Lucie FL CDBG Midport
I
&
Eastport
I
Drainage
Repairs
&
Improvements 










2,000,000
 40
Port
St.
Lucie FL CDBG Torino
Regional
Park 








15,000,000
 40
Port
St.
Lucie FL CDBG Dredging
8
canals 










2,500,000
 50
Port
St.
Lucie FL CDBG Ravenswood
Community
Ctr.
Construc3on 










6,500,000
 100
Port
St.
Lucie FL Energy Traffic
Signal
Enhancement
to
LED
system
‐
saves
power 












100,000
 2
Port
St.
Lucie FL Energy Retrofit
civic
Center
with
a
photovoltaic
system. 










1,600,000
 12
Port
St.
Lucie FL Energy Blackwell
Pumpsta3on
Energy
Conversion
from
fossil
to
electric 










1,500,000
 20
Port
St.
Lucie FL Energy Conduct
energy
analysis
surveys
of
exis3ng
conserva3on
recommenda3ons,
sub‐contract
for
conserva3on

upgrades
and
track
results. 










7,500,000
 160
Port
St.
Lucie FL Public
Safety Automa3c
Vehicle
Locators
(approx.
200
patrol
cars) 












400,000
 0
Port
St.
Lucie FL Public
Safety Bio‐Metric
Fingerprint
Scanners
(1
per
patrol
car) 












200,000
 0
Port
St.
Lucie FL Public
Safety Handheld
computers
(12) 














96,000
 0
Port
St.
Lucie FL Public
Safety Help
Desk
Sobware
for
Police
Dept. 














20,000
 0
Port
St.
Lucie FL Public
Safety Non‐Lethal
Taser
Shotguns
(25)
and
cartridges 














12,500
 0
Port
St.
Lucie FL Public
Safety T3
Mo3on
Vehicles
(2)
for
Civic
Center/Eastern
Region 














20,000
 0
Port
St.
Lucie FL Public
Safety Laptop
Technician
for
Patrol 














40,000
 1
Port
St.
Lucie FL Public
Safety Police
Exchange
Administrator
(email
system) 














50,000
 1
Port
St.
Lucie FL Public
Safety Police
Web/Portal
Manager 














50,000
 1
Port
St.
Lucie FL Public
Safety Gang
Unit

(1
Sgt./4
Officers)((includes
salary,
benefits,
related
equipment
and
vehicle) 












643,697
 5
Port
St.
Lucie FL Public
Safety Hot
Spot
Suppression
Unit
(1
Sgt./4
Officers)(includes
salary,
benefits,
related
equipment
and
vehicle) 












643,697
 5
Port
St.
Lucie FL Public
Safety Police
Officer
Staffing
‐
restore
staffing
level
to
1.75
officers
per
1,000
of
popula3on 










1,000,000
 10
Port
St.
Lucie FL Streets/Roads Kingsway
Waterway
Drainage
Repairs 












750,000
 20
Port
St.
Lucie FL Streets/Roads Replacement
of
cross
street
Culverts,
30 












240,000
 20
Port
St.
Lucie FL Streets/Roads Swale
Drainage
Improvements
6
miles 










1,000,000
 20
Port
St.
Lucie FL Streets/Roads Bridge
Repairs,
27 












500,000
 25
Port
St.
Lucie FL Streets/Roads Citywide
sidewalks
@designated
School
sites
6
miles 










3,000,000
 30
Port
St.
Lucie FL Streets/Roads E
8
Canal
1.5
miles 










2,000,000
 30
Port
St.
Lucie FL Streets/Roads Howard
Creek
Drainage
Improvements
5000
linear
feet 










1,500,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Port
St.
Lucie FL Streets/Roads Construct
and
install
24
hurricane
resistant
transit/school
bus
stop
shelters
with
concrete
founda3ons
and

bicycle
racks,
at
various
loca3ons
throughout
the
City
of
Port
St.
Lucie. 












440,000
 35
Port
St.
Lucie FL Streets/Roads Large
Culvert
Replacement
20
loca3ons,
arterials
&
majors 










2,500,000
 40
Port
St.
Lucie FL Streets/Roads The
extension
of
the
southbound
right
turn
lane
at
the
intersec3on
of
Prima
Vista
Boulevard
and
Bayshore

Boulevard
to
increase
the
efficiency
of
the
intersec3on
and
address
safety
concerns
and
issues. 












110,000
 45
Port
St.
Lucie FL Streets/Roads Expand
Traffic
Monitoring
System
for
efficient
management
of
traffic
flow
throughout
the
city.
Includes
the

installa3on
of
conduit
fiber
op3c
cable,
traffic
monitoring
cameras
and
associated
enhancements. 












850,000
 46
Port
St.
Lucie FL Streets/Roads Overlay
70
miles,
major
collectors
and
secondary
roads 










4,000,000
 50
Port
St.
Lucie FL Streets/Roads Becker
Road
Widening
(4
lanes)
‐
Segment
4
from
Paley
Road
to
Florida's
Turnpike
(0.50
miles) 










5,000,000
 52
Port
St.
Lucie FL Streets/Roads Traffic
Signals
(one
new
&
3
up‐grades)
from
span‐wire
to
current
hurricane
wind
load
requirements.
Includes

the
installa3on
of
mast
arms,
video
detec3on,
traffic
monitoring
equipment
and
associated
enhancements. 










2,950,000
 54
Port
St.
Lucie FL Streets/Roads Floresta
Drive
Widening
(4
lanes)
‐
segment
1
from
Southbend
Blvd.
to
Port
St.
Lucie
Blvd.
(0.70
miles.) 










7,000,000
 72
Port
St.
Lucie FL Streets/Roads Becker
Road
Widening
(4
lanes)
‐
Segment
2
from
Tacoma
St.
to
Albacore
St.
(0.90
miles) 










9,000,000
 93
Port
St.
Lucie FL Streets/Roads Becker
Road
Widening
(4
lanes)
‐
Segment
3
from
Albcore
to
Paley
Road
(1.2
miles) 








12,000,000
 124
Port
St.
Lucie FL Water Sewer
step
tank
conversions
to
grinders
(old
GDC) 










1,800,000
 10
Port
St.
Lucie FL Water Southport
reuse
storage
tank 










2,500,000
 10
Port
St.
Lucie FL Water Transite
force
main
replacement
(old
GDC) 










8,000,000
 10
Port
St.
Lucie FL Water Westport
reuse
storage
pond
lining 










2,500,000
 10
Port
St.
Lucie FL Water Force
main
replacements
required
for
sewer
step
tank
conversio9ns
(old
GDC) 










2,000,000
 15
Port
St.
Lucie FL Water Prineville
deep
injec3on
well
for
concentrate 










6,000,000
 15
Port
St.
Lucie FL Water Reuse
line
from
Glades
to
Saint
Lucie
West 










7,000,000
 15
Riviera
Beach FL Public
Safety ‐Law
Enforcement
Technology
Improvement
Project‐
Purchase
State‐of‐The‐Art
broadband
wireless
data

communica3on
system
for
public
safety. 












500,000
 25
Riviera
Beach FL Transit Decora3ve
Street
Lights
Project
along
Florida
State
Road
A1A
which
includes
the
installa3on,
materials
and

con3ngency
for
333
poles
with
fixtures
and
banner
arms. 










3,163,545
 100
Riviera
Beach FL Water ‐Storm
Water
Management
Plan‐

The
City
will
be
implemen3ng
a
storm
water
management
plan
and
will
construct
a
new
storm
water
drainage

system
that
will
provide
reten3on
and/or
deten3on
of
runoff
to
meet
water
qualit
requirements
that
will
result

in
 










1,000,000
 30
South
Daytona FL CDBG Stormwater
Improvements 














66,925
 8
South
Daytona FL CDBG West
Nova
Water
and
Sewer
Improvements 










1,500,000
 60
South
Daytona FL Energy Non‐Automo3ve
Transporta3on
Project 












250,000
 10
South
Daytona FL Energy Public
Works
Facility
LEEDS
Standard 










6,000,000
 120
South
Daytona FL Streets/Roads Oaklea
Bridge
Replacement
(Vehicle
and
Pedestrian) 










1,500,000
 30
South
Daytona FL Streets/Roads US1
Streetscape
(Undergrounding
U3li3es,
Reuse
Water
Lines,
Roadway
Improvements,
Sidewalk

Improvements,
Streetligh3ng
and
Signaliza3on 










6,500,000
 130
South
Daytona FL Transit Bus
Turn‐offs
on
US1 












500,000
 12
South
Daytona FL Water Teague
Street
Sewer
Extension 










1,000,000
 20
South
Daytona FL Water Lib
Sta3on
Improvements
(lib
sta3ons
1,8,
and
9 










1,500,000
 30
Tallahassee FL Airport Replacement
of
Fire
Alarm
and
Public
Address
Systems
in
the
Passenger
Terminal
‐
This
project
is
to
replace
the

now
20
year
old
Fire
Alarm
and
Public
Address
Systems
in
the
Passenger
Terminal
Building 










1,900,000
 5
Tallahassee FL Airport North
General
Avia3on
Apron
Rehabili3a3on
to
reconstruct
and
overlay
with
new
asphalt 










6,600,000
 30
Tallahassee FL Airport South
General
Avia3on
Apron
Rehabilita3on
to
demolish
and
reconstruct
pavement,
drainage
system,
and
base

material 










7,700,000
 30
Tallahassee FL CDBG Renovate
main
building
at
Smith
Williams
Community
Center 














50,000
 5
Tallahassee FL CDBG Replace
all
windows
at
Smith
Willliams
Community
Center
main
building 












150,000
 5
Tallahassee FL CDBG Reloca3on
and
upgrade
of
overhead
electrical
lines
to
support
the
Gainest
Street
Redevelopment 










1,500,000
 8
Tallahassee FL CDBG ADA‐compliance
renova3ons 












200,000
 10
Tallahassee FL CDBG Construct
an
elevator
at
Smith
William
Community
Center 












150,000
 10
Tallahassee FL CDBG Dorothy
B.
Oven
Park
add/
renovate
concrete
unit
pavers
for
all
pedestrian
walk
ways 












200,000
 10
Tallahassee FL CDBG Interior
renvoa3on
of
annex
building
at
Smith
Williams
Community
Center 












100,000
 10
Tallahassee FL CDBG Myers
Park
Upgrade
4000
sq.
feet
sidewalk,
construct
an
urban
walking
trail,
handicap
accessible,
Add
fitness

sta3ons,
new
walk
bridges,
improve
grad
around
comfort
sta3on
and
remodel
exis3ng
Comfort
sta3on












 












200,000
 10
Tallahassee FL CDBG Myers
Park
Upgrade
4000
sq.
feet
sidewalk,
construct
an
urban
walking
trail,
handicap
accessible,
Add
fitness

sta3ons,
new
walk
bridges,
improve
grad
around
comfort
sta3on
and
remodel
exis3ng
Comfort
sta3on
 












200,000
 10
Tallahassee FL CDBG Playground
upgrades




 












250,000
 10
Tallahassee FL CDBG Renovate
interior
of
gymnasium 












150,000
 10
Tallahassee FL CDBG Winthrop
Park
upgrade
Develop
and
construct
drainage
plan
to
control
erosion
on
East
side,
Replace
sidewalk

and
drainage
around
tennis
courts,
improve
ball
fields
construct
retaining
walls















 












280,000
 10
Tallahassee FL CDBG Bicycle
and
Pedestrian
Master
Plan‐
milling/resurfacing/restriping
to
create
a
route
for
cyclists
to
bypass
one
of

the
busiest
downtown
streets 










1,530,000
 15
Tallahassee FL CDBG Lake
Ella
Upgrades:
Wall
and
erosion
control
on
North
side
of
lake,
Improve
street
drainage
curb
and
gufer

parking
lot,
and
street
add
irriga3on


 












250,000
 15
Tallahassee FL CDBG Replace
fence
in
various
parks
 












500,000
 15
Tallahassee FL CDBG Replace
old
boardwalks,
Picnic
shelter
renova3ons 












500,000
 15
Tallahassee FL CDBG Gaines
Street
Revitaliza3on‐
Water
and
Sewer
upgrades
and
replacement
of
inadequate
pipes 










1,640,000
 20
Tallahassee FL CDBG Retrofit
roof
system
at
Smith
Williams
Community
Center 












500,000
 25
Tallahassee FL CDBG Bicycle
and
Pedestrian
Master
Plan‐
construct
six
missing
sidewalk
segments
to
provide
safe
access
to
several

elementary
schools 










2,454,000
 28
Tallahassee FL CDBG Curb
and
gufer/asphalt
for
park
parking
in
various
parks
 










1,000,000
 30
Tallahassee FL CDBG Reconstruct
curb,
gufer,
sidewalk
and
milling
and
overlay
roadway
for
Gaines
Street
Corridor 










3,500,000
 30
Tallahassee FL CDBG Tom
Brown
Park
Upgrades
Repave
tennis
courts
and
stabilize
soil,
upgrade
court
lights,
fencing,
bleachers,
add

metal
roof
and
renovate
control
sta3on
bathroom
roof,
grading
improvements
around
courts,
Dam
renova3on

at
Lake
Leon,
replace
ball
field
light 










1,500,000
 30
Tallahassee FL CDBG Historical
restora3on
of
the
Ashmore/Yates
block
and
Frenchtown
Village
construc3on 










1,500,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Tallahassee FL CDBG Providence
Neighborhood
ditch
and
sidewalk
improvements 










8,907,285
 70
Tallahassee FL CDBG Low‐Income
Home
Energy
Efficiency
Retrofit
for
1000
homes 










3,000,000
 100
Tallahassee FL Energy 1000
Solar
Roobops‐
80%
grant
for
ci3zens 










4,000,000
 100
Tallahassee FL Energy Turbocor
Compressor
commercial
building
retrofit
80%
grant 










5,000,000
 100
Tallahassee FL Energy District
Cooling
with
Ice
Storage/
2
megawafs 










5,000,000
 125
Tallahassee FL Housing Addi3onal
parking
for
Springfield
Community
Center 















5,000

Tallahassee FL Housing Install
low
water
pressure
toilets 














36,000

Tallahassee FL Housing Paint
front
and
rear
doors
for
neighborhood 














30,500

Tallahassee FL Housing Playground
construc3on
to
prevent
gang
membership
and
create
posi3ve
alterna3ve 














36,000

Tallahassee FL Housing Repair/replace
exis3ng
sidewalks 












152,500

Tallahassee FL Housing Replace
bathroom
sinks
in
vacant
units 












157,150

Tallahassee FL Housing Replace
damaged
or
extended‐life
roofs 












338,000

Tallahassee FL Housing Replace
kitchen
cabinets
in
vacant
units 














48,000

Tallahassee FL Housing Security
camera
system
for
community
centers 














40,000

Tallahassee FL Housing Upgrade
appliances
with
energy
star
reated
items 














21,000

Tallahassee FL Housing Upgrade
kitchen
countertops 












375,000

Tallahassee FL Housing Replace
bathroom
floors
in
two‐story
buildings 














39,000
 2
Tallahassee FL Housing Energy
efficient
windows,
roof
and
appliances
upgrade 












250,000
 12
Tallahassee FL Housing Resident
skill
training
center 














10,000
 12
Tallahassee FL Housing Erosion
control
to
improve
safety
and
property
values 












250,000
 25
Tallahassee FL Public
Safety Implemen3ng
a
surveillance
camera
system
throughout
downtown
business
district
and
adjoining
Gaines

Street
corridor
‐
u3lizing
technology
as
a
tool
for
crime
reduc3on 










7,500,000
 75
Tallahassee FL Schools Schools
on
Solar
Program
‐
solar
energy
in
school
facili3es 










5,000,000
 150
Tallahassee FL Streets/Roads Capital
Circle
Northwest/Southwest
Demoli3on 












500,000
 10
Tallahassee FL Streets/Roads Raymond
Diehl
Road
Improvements,
curb,
gufer,
sidewalks
and
bike
lanes 










3,000,000
 22
Tallahassee FL Streets/Roads New
Cascade
Lane
and
Intersec3on
Improvements
to
improve
safety
and
con3nuity 










2,850,100
 35
Tallahassee FL Transit Increase
StarMetro
administra3ve
office
building 












301,688
 10
Tallahassee FL Transit StarMetro
wellness
center 












175,208
 10
Tallahassee FL Transit Upda3ng
and
expanding
C.K.
Steele
transit
hub 












245,000
 10
Tallahassee FL Transit Replacement
buses
for
StarMetro,
which
has
30
buses
which
are
past
their
useful
life 








11,730,000
 30
Tallahassee FL Transit Construc3on
of
StarMetro
(transit
system)

regional
training
center 










1,657,532
 100
Tallahassee FL Water Pump
Sta3on
70
Construc3on 












540,000
 8
Tallahassee FL Water Capital
Circel
Southeast
Sinkhole
repair 












250,000
 10
Tallahassee FL Water Pump
Sta3on
53
Construc3on 












750,000
 10
Tallahassee FL Water Cascade
park
Sanitary
Sewer
Replacement
to
reduce
high
fecal
coliform
in
adjacent
stream
and
reduce
costs
at

treatment
center 












891,930
 12
Tallahassee FL Water Northeast
Capital
Circle
Force
Mail
Replacement 










7,800,000
 22
Tallahassee FL Water Cascade
Park
Spot
Remedia3on‐
excava3on
and
removal
of
soil
from
impacted
areas 












250,000
 25
Tallahassee FL Water Cascade
Park
Stormwater
Project‐
By‐Pass
Box
Culvert 










4,239,115
 50
Tallahassee FL Water Capital
Circle
Northwest
Regional
Stormwater
Pond
and
Park
Enhancements 










1,200,000
 59
Tallahassee FL Water Delta
Regional
Stormwater
Management
Facility
construc3on 










7,725,000
 100
Tamarac FL Energy Conversion
to
LED
street
lights.
Tradi3onal
technology
would
be
replaced
with
Energy
efficient
LED
ligh3ng,

resul3ng
in
savings
of
265,000
Kwafs
per
year 












300,000
 8
Tamarac FL Energy Data
center/desktop
virtualiza3on
ini3a3ve
to
increase
efficiency
and
reduce
entrgy
usage
by
virtualizing
24
servers
and
200
desktop
computers

with
two
energy
smart
servers.

Resul3ng
savings
of
117,531
Kwats
annually 












182,000
 8
Tamarac FL Energy Municipal
solar
panels
‐
retrofiqng
of
city
facil3es
with
solar
panels
resul3ng
in
savings
of
250,000
Kwafs
per

year 












800,000
 20
Tamarac FL Streets/Roads Construc3on
of
integrated
systems
of
bike
lanes/walkways
to
provide
alternate
transportaiton
opportuni3es.


Narrow
roads
to
not
allow
for
"sharing"
of
roadways
for
alternate
transportaiton. 










4,000,000
 50
Tamarac FL Water replacement/upgrade
of
piping
and
pumps
at
City's
wastewater
pump
sta3ons
located
throughout
city.

Project

would
ensure
reliability
of
operaton
and
prevent
failure
resul3ng
in
contamina3on
 












800,000
 12
Tamarac FL Water Infrastructure
infiltra3on
and
inflow
reduc3on
City
would
reline
es3mated
10
miles
of
gravity
sewer
system

pipes
serving
to
propect
the
environment
and
water
source
by
reducing
the
amount
of
wastewater
discharged

by
2.6
billion
gallons
 










2,000,000
 20
Tamarac FL Water Water
recovery;
installa3on
of
backwash
recovery
equipment
to
recover
water
from
package
filters
for
reuse.


Would
conserve
by
reusing
up
to
300,0000
gallons
of
water
perday
currently
being
discharged
to
surface

waters. 










2,200,000
 25
Tamarac FL Water Economic
cevelopment
redevelopment
in3a3ve‐
Mainstreet
Town
Center
Project.

Revitaliza3on
of
corridor

required
in
form
of
construc3on
of
potable
water,
sanitary
sewer
and
stormwater
drainage
systems($1.6

milllion)
 










4,500,000
 45
Tampa FL CDBG Seminole
Garden
Center.
Renova3on
of
exis3ng
community
center. 










1,500,000
 20
Tampa FL CDBG NFL
YET
Community
Center
Addi3on.
Project
provides
for
an
audio
visual
studio
and
weight
room
addi3on
to
exis3ng
community
center. 












500,000
 30
Tampa FL CDBG Springhill
Park.
New
14,000
sf
community
center,
building
built
to
sa3sfy
silver
LEED
requirements. 










3,600,000
 50
Tampa FL Energy Climate
Control.
This
project
provides
for
the
replacement
of
deteriorated
HVAC
(hea3ng,
ven3la3ng,
air
condi3oning)
systems

at
various
city
facili3es.
Many
of
these
systems
have
exceeded
their
useful
lives
and
replacement
units
will

produce
both
en 












150,000
 10
Tampa FL Energy Energy
Management
Systems.
This
project
provides
for
the
installa3on
of
energy
management
systems
at
various
city
facili3es
to

reduce
and

op3mize
electrical
consump3on.
System
also
allow
remote
monitoring
so
that
problems
are
addressed
quickly.













100,000
 10
Tampa FL Energy Fleet
Maintenance
Ligh3ng.
This
project
provides
for
the
replacement
of
deteriorated
and
inefficient
ligh3ng
at
the
fleet
maintenance

service
facility
with
high
efficiency
ligh3ng
that
will
reduce
electrical
usage
and
improve
ligh3ng
quality. 












100,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Tampa FL Energy Fire
Sta3on
Roof
Replacements.
This
project
provides
for
the
replacement
of
exis3ng
fire
sta3on
roofs.
Reroffing
is
necessary
to
maintain

viability
of
sta3ons.
Roof
types
vary,
but
Cool
Roof
type
materials
to
be
u3lized
in
all
loca3ons
possible. 












125,000
 20
Tampa FL Energy Old
City
Hall
Elevator
restora3on.
Project
provides
for
the
replacement
of
an
exis3ng
manual
passenger
elevator
with
an
automa3c
system.
New

controls
will
provide
energy
efficiency
and
savings. 












650,000
 20
Tampa FL Energy Parking
Garage
Ligh3ng
Upgrade.
This
project
provides
for
the
replacement
of
deteriorated
and
inefficient
ligh3ng
in
parking
garages
with
high

efficiency
ligh3ng
that
will
reduce
electrical
use
and
increase
safety
in
the
garages. 












530,000
 20
Tampa FL Energy Roof
Replacement.
This
project
provides
for
replacement
of
deteriorated
roofs
at
various
city
owned
facili3es.
The
new
material

will
be
Cool
Roof
Ra3ng
Council
approved
and
provide
reduced
heat
gain
which
results
in
energy
savings. 












200,000
 20
Tampa FL Energy Tampa
Municipal
Office
Building
Climate
Control
(HVAC)
System
Upgrade.
This
project
provides
for
the
replacement
of
10
‐
31
year
old
deteriorated
air
handlers
and
ductwork. 










1,275,000
 30
Tampa FL Streets/Roads Brorein
Street
Bridge
Improvements.
Rehabilita3on
of
exis3ng
movable
bridge. 










2,500,000
 10
Tampa FL Streets/Roads School
Zone
Flasher
Implementa3on.
Installa3on
of
19
School
Zone
Flashers
at
9
Elementary/Middle
Schools
in
the
City
of
Tampa. 












125,000
 10
Tampa FL Streets/Roads Bayshore
Balustrade.
Implementa3on
of
structural
repair
of
ballustrade
on
bayshore.
Balustrade
and
seawall

provide
eastern
edge
of
Bayshore
Blvd
corridor
a
major
city
arterial. 












298,000
 20
Tampa FL Streets/Roads Citywide
Sidewalk
Improvements.
Project
provides
for
installa3on
of
new
sidewalks
in
loca3ons
without

sidewalks. 










1,000,000
 20
Tampa FL Streets/Roads Citywide
Sidewalk
Repair
and
Replacement.
Project
provides
for
repair
and
replacement
of
exis3ng
sidewalks

and
accessibility
improvements. 










1,000,000
 20
Tampa FL Streets/Roads Dale
Mabry
/
Kennedy
Blvd
Intersec3on
Improvements.
Project
provides
for
comprehensive
improvements
to
this
major
intersec3on. 










1,200,000
 20
Tampa FL Streets/Roads Fleet
Maintenance
Bulk
Fluid
Distribu3on
System.
Project
provides
for
installa3on
of
bulk
fluid
delivery
system,

which
eliminates
use
of
barrells
and
drum
storage
for
various
vehicle
fluids. 












598,000
 20
Tampa FL Streets/Roads Mac
Dill
/
Kennedy
Blvd
Intersec3on
Improvements.
Project
provides
for
comprehensive
improvements
to
this
major
intersec3on. 










1,000,000
 20
Tampa FL Streets/Roads River
Garden
Shoreline
Improvements
Phase
II.
Con3nua3on
of
shoreline
restora3on
north
of
columbus.

Shoreline
and
greenspace
provide
waterside
edge
of
exis3ng
roadway. 












300,000
 20
Tampa FL Streets/Roads Tampa
Theatre
Electrical
Room
Upgrade.
Project
provides
for
new
roof
and
roof
structure
over
exis3ng

electrical
room
at
theatre.
Roof
also
serves
as
the
sidewalk
for
Polk
St. 












600,000
 20
Tampa FL Streets/Roads Cass
Street
Bridge
Improvements.
Rehabilita3on
of
exis3ng
movable
bridge. 










2,000,000
 30
Tampa FL Streets/Roads Laurel
Street
Bridge
Improvements.
Rehabilita3on
of
exis3ng
movable
bridge. 










2,500,000
 30
Tampa FL Streets/Roads Citywide
Roadway
Resurfacing.
Provides
for
resurfacing
of
exis3ng
city
roadways.
Project
provides
for
approx.

10
miles
of
resurfacing. 










4,000,000
 40
Tampa FL Water HFC
AWTP
‐
60‐inch
Flow
Meter
Replacement
at
Meter
Vault
#2.
The
project
scope
is
to
replace
the
60‐inch

flow
meter
(MRC‐2)
at
the
main
wastewater
treatment
plant
with
a
new
magne3c
flow
meter
and
all

associated
electrical
work. 












100,000
 6
Tampa FL Water Morrison
Pump
Sta3on
Rehabilita3on.
Project
provides
for
rehablita3on
and
upgrade
of
exis3ng
wastewater
pumping
sta3on. 












300,000
 16
Tampa FL Water San
Carlos
Pump
Sta3on
Wet
Well
&
Screen
Room
Rehabilita3on.
Project
provides
for
the
restora3on
of

exis3ng
pump
sta3on
components
including
concrete
repair,
ducts,
alarms
and
skylights. 












300,000
 16
Tampa FL Water Knights:
Harborview
to
Lawn.
Line
exis3ng
stormwater
box
culvert
in
place. 












500,000
 20
Tampa FL Water Boxwood
Drive
Distribu3on
Main.
Replacement
of
2,474
linear
feet
of
8‐inch
diameter
water
distribu3on
main
in
the
Boxwood
Drive
area.

The

exis3ng
mains
are
undersized.

The
new
pipeline
will
improve
water
pressure,
service
reliability
and
fire
protec 












374,000
 22
Tampa FL Water Gomez
Pump
Sta3on
Rehabilita3on.
Project
provides
for
rehablita3on
and
upgrade
of
exis3ng
wastewater
pumping
sta3on. 












400,000
 22
Tampa FL Water Halifax
Drive
Distribu3on
Main.
Replacement
of
2,914
linear
feet
of
8‐inch
diameter
water
distribu3on
main
in
the
Halifax
Drive
area.

The

exis3ng
pipelines
are
undersized.

The
new
pipeline
will
improve
water
pressure,
service
reliability
and
fire
pr 












441,000
 22
Tampa FL Water Olympia
Avenue
Distribu3on
Main.
Replacement
of
2,362
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Olympia
Avenue

area.

The
exis3ng
pipelines
are
undersized
and
asbestos
lined.

The
new
pipeline
will
improve
water
pressure, 












353,000
 22
Tampa FL Water 124th
Avenue:
Taliaferro
to
15th
Street
Force
Main
Replacement.
Project
consists
of
the
installa3on
of
3,500

feet
of
6‐inch
force
main
in
124th
Avenue

between
Taliaferro
and
15th
Streets.

The
work
also
includes
a
jack

and
bore
crossing
under
CSX
railroad 












425,000
 24
Tampa FL Water Bayerle
Circle
Distribu3on
Main.
Replacement
of
3,922
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Bayerle
Circle.


The
exis3ng
mains
are
undersized
and
asbestos
lined.

The
new
pipeline
will
improve
water
pressure,
service 












579,000
 24
Tampa FL Water Gunlock
Avenue
Distribu3on
Main.
Replacement
of
4,364
linear
feet
of
8‐inch
diameter
water
distribu3on
main
in
the
Gunlock
Avenue
area.

The

exis3ng
pipelines
are
undersized.

The
new
pipeline
will
improve
water
pressure,
service
reliability 












660,000
 24
Tampa FL Water HFC
AWTP
HVAC
Improvements
at
Administra3on
Building.
Project
provides
for
comprehensive
replacement

and
upgrade
of
exis3ng
HVAC
system
for
buildng
at
the
main
wastewater
treatment
plant.
Includes
new
air

handlers
and
chiller
and
associated
work
 












425,000
 24
Tampa FL Water Museum/Cur3s
Hixon
Park
Reclaimed
Distribu3on
Main.
Installa3on
of
4,100
linear
feet
of
12‐inch
diameter
reclaimed
water
distribu3on
main
from
the
intersec3on
of

Bayshore
Boulevard
and
Hyde
Park
Boulevard
to
Cur3s
Hixon
Park.
 












750,000
 24
Tampa FL Water San
Pablo
Place
Distribu3on
Main.
Replacement
of
4,684
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
San
Pablo
Place
area.


The
exis3ng
mains
are
asbestos
cement
lined
pipes.

The
new
pipeline
will
improve
water
pressure,
service













699,000
 24
City State Program Project
Descrip3on Funding
Required Jobs
Tampa FL Water HFC
AWTP
Junc3on
Chamber
#1
Rehabilita3on
‐
Phase
1.
The
project
consists
of
the
removal
of
approximately

750
cubic
yards
of
sand,
grit,
and
debris
from
Junc3on
Chamber
1
located
at
the
main
wastewater
treatment

plant. 












500,000
 28
Tampa FL Water Drew
Park
Distribu3on
Main.
Replacement
of
7,468
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
Drew
Park.

The

exis3ng
pipelines
are
undersized
and
are
not
looped.

The
new
pipeline
will
improve
water
pressure,
service

reliability 










1,125,000
 32
Tampa FL Water Larmon
Street
Distribu3on
Main.
Replacement
of
7,527
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Larmon
Street

area.

The
exis3ng
pipelines
are
undersized
and
asbestos
cement
lined.

The
new
pipeline
will
improve
water

press 










1,132,000
 32
Tampa FL Water Melrose
Street
Distribu3on
Main.
Replacement
of
7,335
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Melrose
Street

area.

The
exis3ng
pipelines
are
undersized,
unlined
cast
iron,
and
not
looped.

 










1,102,000
 32
Tampa FL Water 42nd
Street
Pump
Sta3on
Rehabilita3on.
Project
provides
for
rehablita3on
and
upgrade
of
exis3ng
wastewater

pumping
sta3on. 












600,000
 34
Tampa FL Water Corona
Street
Distribu3on
Main.
Replacement
of
5,077
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Corona
Street

area.

The
exis3ng
pipelines
are
undersized.

The
new
pipeline
will
improve
water
pressure,
service
reliability 












762,000
 36
Tampa FL Water HFC
AWTP
Road
Repairs
‐
replace
pavement
south
of
Dewatering
Building.
The
project
includes
the
replacement
of
3,400
SY
of
exis3ng
failed
asphalt
pavement
with
concrete
pavement

at
the
main
wastewater
treatment
plant. 












460,000
 36
Tampa FL Water HFC
AWTP
Digester
#6
Rehabilita3on
‐
Phase
2.
This
project
provides
for
the
rehabilita3on
of
an
exis3ng
digester
at
the
main
water
treatment
plant. 












750,000
 42
Tampa FL Water Sewer
System
Evalua3on
Study
‐
Manhole
Rehabilita3on
‐
Phase
1.
The
project
consists
of
the
rehabilita3on
of
approximately
100
manholes
in
the
Krause
Pumping
Sta3on
basin.


The
rehabilita3on
will
involve
the
applica3on
of
a
structural
coa3ng,
rest 












750,000
 42
Tampa FL Water Miscellaneous
Cured‐In‐Place‐Pipe
Rehabilita3on
Contract.
The
project
consists
of
the
rehabilita3on
of
gravity

sewers
from
8‐inch
diameter
to
36‐inch
diameter
at
various
loca3ons
throughout
the
City
of
Tampa

Wastewater
Department’s
service
area. 










1,000,000
 56
Tampa FL Water Euclid
Box
Rehabilita3on.
Shotcrete
exis3ng
stormwater
box
in
place,
no
room
in
r/w
for
replacement. 










6,550,000
 60
Tampa FL Water Interbay
Water
Distribu3on
Main.
Replacement
of
18,046
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Interbay

neighborhood.

The
exis3ng
pipelines
are
undersized
mains.

The
new
larger
pipeline
will
improve
water

pressure, 










2,680,000
 62
Tampa FL Water Morrison
Distribu3on
Main.
Replacement
of
18,273
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Morrison

Avenue
area.

The
exis3ng
pipelines
are
undersized
and
unlined
cast
iron.

The
new
pipeline
will
improve
water

pressure, 










2,748,000
 62
Tampa FL Water Davis
Islands
Distribu3on
Main.
Replacement
of
26,670
linear
feet
of
6‐inch
diameter
water
distribu3on
main
on
Davis
Islands.

The
exis3ng

pipelines
are
undersized
cast
iron.

The
new
pipeline
will
improve
water
pressure,
service
reliability
and
fire 










3,928,532
 74
Tampa FL Water Spanishtown
Creek
Drainage
Improvements.
Three
phases:
Supplement
an
undersized
and
failing
stormwater

box
culvert
system
($15m),
reinforce
and
restore
the
exis3ng
system
($3m),
and
extend
laterals
into
area
which

depends
on
sheet
flow
($5m)
These
projec 








23,000,000
 80
Tampa FL Water CIAC
Water
Transmission
Main
–
Area
No.
1
Construc3on
of
a
new
60,050
linear
feet
of
36‐inch
through
48‐inch
diameter
water
transmission
main
from

the
David
L.
Tippin
Water
Treatment
Facility
to
downtown
and
South
Tampa.

Planned
redevelopment
in
Down 








25,586,000
 82
Tampa FL Water Bruce
B.
Downs
Widening
‐
Segment
"B/C"
‐
JPA
with
Hillsborough
County.
Project
consists
of
the
installa3on
of
18,000
feet
of
30‐inch
force
main
in
Bruce
B.
Downs
between
Palm

Springs
Boulevard
to
Cross
Creek
Boulevard. 










5,000,000
 278
Tavares FL CDBG Community
Back
Yard
Project
at
Aesop's
Park
 












300,000
 12
Tavares FL CDBG City
of
Tavares‐
Bury
Electrical
Lines

 












500,000
 20
Tavares FL CDBG Public
Furniture
Program,
Art
&
Way
Finding
Program


 










1,500,000
 60
Tavares FL CDBG Public
Works
Facility
Project 










1,800,000
 72
Tavares FL Public
Safety Police/Fire/EOC
Reloca3on
Project 










7,800,000
 312
Tavares FL Streets/Roads Gateway
Improvement
Project
 










2,000,000
 80
Tavares FL Streets/Roads Main
Street
Air
Quality
Improvement
Traffic
Circle
 










2,000,000
 80
Tavares FL Streets/Roads Deteriora3ng
Roadway
and
Sidewalk
Restora3on
Project 










5,000,000
 200
Tavares FL Streets/Roads Tavares
Square
 










5,000,000
 200
Tavares FL Streets/Roads Reconstruc3on
of
Ruby
Street
Corridor 










5,500,000
 220
Tavares FL Streets/Roads Reconstruc3on
of
Alfred
Street
Corridor 










9,330,000
 373
Tavares FL Transit Rail
Road
Track
and
Intersec3on
Crossing
Upgrades 










1,100,000
 44
Tavares FL Transit Rail
Road
Train
Sta3on
in
Down
Town
Tavares 










1,100,000
 44
Tavares FL Transit Tavares
Rail
Road
Bridge
Replacement 










1,320,000
 53
Tavares FL Transit Mixed
Use
Commuter
Rail
Public
Parking
Garage 










6,800,000
 272
Tavares FL Transit Rail
Road
Upgrades
(Plymouth
to
Tavares) 








13,200,000
 528
Tavares FL Water Reclaimed
Water
Distribu3on
System
Improvements
to
Support
Downtown
Redevelopment
–
Phase
II 












529,000
 21
Tavares FL Water Reclaimed
Water
Distribu3on
System
Improvements
for
Alfred
Street
and
Ruby
Street
Corridors
–
Phase
I 












653,000
 26
Tavares FL Water Wastewater
Collec3on
System
Improvements
for
Alfred
Street
and
Ruby
Street
Corridors
–
Phase
I 










1,019,000
 50
Tavares FL Water Water
Distribu3on
System
Improvements
for
Alfred
Street
and
Ruby
Street
Corridors‐Phase
I 












958,000
 50
Tavares FL Water Alleyway
Pervious
Paver
Block
Stormwater
Recharge
Project 










2,000,000
 80
Tavares FL Water Water
Distribu3on
System
Improvements
to
Support
Downtown
Redevelopment
–
Phase
II 










6,690,000
 268
Tavares FL Water Wastewater
Collec3on
System
Improvements
to
Support
Downtown
Redevelopment
–
Phase
II 










6,822,000
 273
Tavares FL Water CRA
Stormwater
Construc3on 








10,000,000
 400
Tavares FL Water Reclaimed
Water
System
Implementa3on 








18,000,000
 720
Wellington FL CDBG C2
Canal
Mi3ga3on
including
flood
afenua3on,
water
quality
enhancements
and
storage
of
surface
water 












700,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Wellington FL CDBG Barrier‐free
playground
on
community
center
site
for
special
needs
children 










1,000,000
 25
Wellington FL CDBG Amphitheater
construc3on
on
community
center
site
for
cultural
events 










1,000,000
 30
Wellington FL CDBG Aqua3c
Center
Improvements
including
construc3on
of
office,
restrooms,
and
recrea3onal
areas
to
include

pool
hardware 










1,500,000
 30
Wellington FL CDBG Addi3on
of
fields,
prac3ce
areas,
and
public
access
to
vacant
Village‐owned
land
to
include
field
renova3ons

and
equipment
replacement
at
exis3ng
parks 










3,000,000
 50
Wellington FL CDBG Municipal
complex
construc3on
to
centralize
Village
offices
and
provide
significant
3me
and
opera3ng
savings

per
LEED
standards 








15,000,000
 250
Wellington FL CDBG Central
Business
District
Redevelopment
including
revitaliza3on
of
core
business
centers
including
land

assembly,
development
incen3ves
and
infrastructure
expansion
to
facilitate
redevelopment 








25,000,000
 500
Wellington FL CDBG Revitaliza3on
of
aging
residen3al
and
commercial
areas,
par3cularly
transi3onal
neighborhoods
experiencing

high
crime
and
deteriora3ng
infrastructure 








20,000,000
 500
Wellington FL Energy Community
Center
Renova3ons
including
energy
retrofit
of
neighborhood
and
community
center 










2,000,000
 150
Wellington FL Streets/Roads Resurfacing
of
Village
roads 










1,500,000
 30
Wellington FL Streets/Roads Forest
Hill
Boulevard
‐
crea3on
of
a
main
street
including
roadway
construc3on,
pathways,
and
bike
lanes. 










5,000,000
 150
Wellington FL Streets/Roads Southshore
Boulevard
‐
Road
widening 










7,000,000
 200
Wellington FL Transit Trolley
system
to
serve
local
communi3es 










1,200,000
 10
Wellington FL Water Potable
Water
Facility
Renova3on
including
the
replacement
of
out‐of‐date
and
inefficient
water
systems
with

more
effec3ve
and
efficient
systems 










5,000,000
 75
Wellington FL Water Reuse
Water
System
Expansion
to
increase
reuse
transmission
and
distribu3on
to
preserve
water
resources 










5,000,000
 75
Wellington FL Water Storage
Reservoir
construc3on
to
improve
source
water
capacity
in
industrial
and
medical
corridor 










3,000,000
 75
Wellington FL Water Wastewater
Renova3on
Project
including
the
installa3on
of
new
technology
for
treatment
of
waste
effluent
for

wastewater
u3lity
opera3ons 








10,000,000
 150
West
Palm
Beach FL CDBG Emergency
Generators
for
Facili3es 












550,000
 0
West
Palm
Beach FL CDBG Grassy
Waters
Preserve
Improvements 












600,000
 5
West
Palm
Beach FL CDBG Stormwater
Phase
III
Infrastructure
Projects 










1,805,000
 15
West
Palm
Beach FL Public
Safety Fire
Fleet
Replacement 










4,200,000
 0
West
Palm
Beach FL Public
Safety Police
Helicopter
Replacement 










1,200,000
 0
West
Palm
Beach FL Public
Safety Fire
Sta3on
Replacements
#4,
#5,
#8 








13,500,000
 100
West
Palm
Beach FL Streets/Roads Market
Street 










1,500,000
 12
West
Palm
Beach FL Streets/Roads Parker
Avenue 










2,350,000
 19
West
Palm
Beach FL Streets/Roads 33rd
Street 










3,000,000
 24
West
Palm
Beach FL Streets/Roads Monceaux 










4,000,000
 32
West
Palm
Beach FL Streets/Roads Spencer
Drive 










4,000,000
 32
West
Palm
Beach FL Streets/Roads Lakewood
Road 










4,700,000
 38
West
Palm
Beach FL Streets/Roads Monroe
Drive 










6,600,000
 53
West
Palm
Beach FL Streets/Roads Broadmoor
Ave 








13,000,000
 104
West
Palm
Beach FL Streets/Roads North
Flagler
Drive 








21,000,000
 168
West
Palm
Beach FL Water Meter
Change
Out 












877,500
 3
West
Palm
Beach FL Water Control
2
Replacement 












500,000
 4
West
Palm
Beach FL Water Okeechobee
Median
Improvements 












600,000
 5
West
Palm
Beach FL Water Control
4
Replacement 










1,200,000
 10
West
Palm
Beach FL Water Westward
Repump
Sta3on 










2,200,000
 18
West
Palm
Beach FL Water Aquifer
Storage
and
Recovery
Well
Rehabilita3on 










2,500,000
 20
West
Palm
Beach FL Water CIS
System
Upgrade 










2,500,000
 20
West
Palm
Beach FL Water Valley
Forge
Pump
Sta3on 










2,975,000
 24
West
Palm
Beach FL Water Water
Treatment
Plant
Improvements 










8,000,000
 64
West
Palm
Beach FL Water Water
Treatment
Plant
Improvements
‐
Tier
2 








12,000,000
 96
West
Palm
Beach FL Water Cogenera3on
Facili3es
East
Central
Regional
Water
Reclama3on
Facili3es 








12,500,000
 100
Winter
Springs FL Streets/Roads Hayes
Road
turn
lanes. 












125,000
 10
Winter
Springs FL Streets/Roads Orange
Avenue
exten3on 












300,000
 10
Winter
Springs FL Streets/Roads Vistawilla
Turn
lanes 












125,000
 10
Winter
Springs FL Streets/Roads Wade
Street
improvements‐‐paing,
curbs,
drainage 












300,000
 15
Winter
Springs FL Streets/Roads Blake
Blvd‐‐construc3on
of
a
new
road. 










1,200,000
 20
Acworth GA Streets/Roads City
of
Acworth,
Ga.
Const./Repair
parking,laydown,delivery
support
complex 










1,000,000
 25
Acworth GA Streets/Roads City
of
Acworth,
Ga.
Construct
road
enbankment
support
walls 










1,250,000
 25
Acworth GA Streets/Roads City
of
Acworth,
Ga.
Repave/repair
various
streets 










1,500,000
 30
Acworth
 GA Streets/Roads Construct
for
pedestrian
connec3vity,
sidewalks;
various
loca3ons

 












200,000
 10
Alpharefa GA CDBG North
Park
and
Wills
Park
Playground
Replacement 












100,000
 2
Alpharefa GA CDBG Wills
Park
Picnic
Shelter
Replacement 














80,000
 2
Alpharefa GA CDBG Alpharefa
Adult
Ac3vity
Center
Expansion 












200,000
 4
Alpharefa GA CDBG Community
Center
Phase‐III 










6,955,000
 139
Alpharefa GA CDBG Wills
Park
Pool
Renova3on 










8,560,000
 171
Alpharefa GA CDBG Webb
Bridge
Park
Community
Center 








18,190,000
 364
Alpharefa GA Public
Safety Department
Fleet
(police
vehicles
Qty:
125;
fire
vehicles
Qty:
9) 










4,645,000
 0
Alpharefa GA Public
Safety Electronic
Fingerprin3ng
Equipment 














65,000
 0
Alpharefa GA Public
Safety Off‐Road
Medical
Response
Vehicle
(Qty:
1) 














30,000
 0
Alpharefa GA Public
Safety Rehab
Vehicle
(Qty:
1) 












440,000
 0
Alpharefa GA Public
Safety Remote
Observa3on
and
Surveillance
Equipment 












300,000
 0
Alpharefa GA Public
Safety Rescue
Vehicles
(Qty:
2) 












400,000
 0
Alpharefa GA Public
Safety Self‐Contained
Breathing
Apparatus
(SCBA)
Air
Bofles 














40,000
 0
Alpharefa GA Public
Safety Weapons
Replacement 












127,500
 0
Alpharefa GA Public
Safety Automated
Tone
Alert
System 












100,000
 2
Alpharefa GA Public
Safety Fire
Sta3on
(1‐4)
Floor
Refinishing 












130,000
 2
Alpharefa GA Public
Safety Fire
Sta3on
(1‐4)
Ven3la3on
System 












180,000
 3
Alpharefa GA Public
Safety Indoor
Shoo3ng
Range 










1,100,000
 22
Alpharefa GA Streets/Roads Broadwell
Road
and
Rucker
Road
(Intersec3on) 












150,000
 3
City State Program Project
Descrip3on Funding
Required Jobs
Alpharefa GA Streets/Roads Citywide
Loop
Detector
Maintenance 












150,000
 3
Alpharefa GA Streets/Roads Marconi
Drive
(Windward
Pkwy
to
proposed
Big
Creek
Greenway
parking
lot) 












160,000
 3
Alpharefa GA Streets/Roads Bethany
Road
(Chelsey
Lane
to
Chan3lly
Drive) 












200,000
 4
Alpharefa GA Streets/Roads Windward
Parkway
and
North
Point
Parkway
(Intersec3on) 












175,000
 4
Alpharefa GA Streets/Roads Mid‐Broadwell
Road
and
Bethany
Road
(Intersec3on) 












250,000
 5
Alpharefa GA Streets/Roads Mid‐Broadwell
Road
Phase‐IV
(Wieland
property
to
Bethany
Road) 












240,000
 5
Alpharefa GA Streets/Roads Broadwell
Road
(Rucker
Road
to
Cathedral
Drive) 












300,000
 6
Alpharefa GA Streets/Roads Citywide
Traffic
Control
Equipment 












300,000
 6
Alpharefa GA Streets/Roads Citywide
Traffic
Striping
and
Signage 












300,000
 6
Alpharefa GA Streets/Roads Windward
Parkway
(North
Point
Parkway
to
Windward
Plaza) 












300,000
 6
Alpharefa GA Streets/Roads Douglas
Road
(Nasser
Avenue
to
McGinnis
Ferry
Road) 












350,000
 7
Alpharefa GA Streets/Roads Encore
Parkway
(North
Point
Parkway
to
GA
400) 












340,000
 7
Alpharefa GA Streets/Roads Mid‐Broadwell
Road
Phase‐III
(Fire
Sta3on
5
to
Wieland
property) 












350,000
 7
Alpharefa GA Streets/Roads Morris
Road
and
Old
Milton
Parkway
(Intersec3on) 












350,000
 7
Alpharefa GA Streets/Roads State
Route
9
(Upper
Hembree
Road
to
Northfall) 












450,000
 9
Alpharefa GA Streets/Roads Bethany
Road
and
Mayfield
Road
(Intersec3on) 












500,000
 10
Alpharefa GA Streets/Roads Old
Milton
Parkway
Pedestrian
Bridge 












500,000
 10
Alpharefa GA Streets/Roads Webb
Bridge
Road
(Westwind
subdivision
to
Webb
Bridge
Way) 












510,000
 10
Alpharefa GA Streets/Roads Douglas
Road
Pedestrian
Bridge
and
Sidewalk 












550,000
 11
Alpharefa GA Streets/Roads North
Point
Parkway
(Encore
Parkway
to
Haynes
Bridge
Road) 












700,000
 14
Alpharefa GA Streets/Roads North
Point
Parkway
Signal
Interconnect
and
Timing
(GDOT) 










1,070,000
 21
Alpharefa GA Streets/Roads Windward
Parkway
Signal
Interconnect
and
Timing
(GDOT) 










1,150,000
 23
Alpharefa GA Streets/Roads Kimball
Bridge
Road
and
Waters
Road
(Intersec3on)
‐
(GDOT) 










1,337,000
 27
Alpharefa GA Streets/Roads Rucker
Road
(4
separate
sec3ons
‐
see
CIP
Input
Form) 










1,500,000
 30
Alpharefa GA Streets/Roads Webb
Bridge
Road
and
Shirley
Bridge
Road
(Intersec3on)
‐
(GDOT) 










1,510,000
 30
Alpharefa GA Streets/Roads Citywide
Milling
&
Resurfacing 










2,400,000
 48
Alpharefa GA Streets/Roads Kimball
Bridge
Road
(Bridge
Replacement)
‐
(GDOT) 










3,000,000
 60
Alpharefa GA Water Old
Roswell
Road
(Drainage) 












100,000
 2
Alpharefa GA Water Lantern
Ridge
Court
(Stormwater) 












145,000
 3
Alpharefa GA Water Citywide
Stormwater/Drainage
Repair 












450,000
 9
Athens GA Airport Obstruc3on
Clearing
Runway
9 












363,000
 20
Athens GA Airport Apron
Rehabilita3on
Project
Phase
II 












856,000
 75
Athens GA CDBG Purchase
10
hybrid
vehicles 












300,000

Athens GA CDBG Courthouse
Interior
/
Exterior
‐
Pain3ng


 












113,000
 10
Athens GA CDBG Taylor
Grady
Interior
/
Exterior
‐
Pain3ng 












115,000
 10
Athens GA CDBG Convert
50
police
cars
to
run
on
U.S.
natural
gas
and
build
requisite
fueling
sta3ons 










1,400,000
 12
Athens GA CDBG Saferfield
Park
Ligh3ng
Upgrade

 












700,000
 20
Athens GA CDBG Bishop
Park
Ballfield
Ligh3ng
Upgrade


 












800,000
 25
Athens GA CDBG Holland
Sports
Complex
Ligh3ng
Upgrade

 












750,000
 25
Athens GA CDBG Library
Carpet
Installa3on

 












250,000
 30
Athens GA CDBG Construct
new
Evidence
and
forensic
facility
behind
PD 










4,900,000
 45
Athens GA CDBG Diversion
Center 










4,000,000
 50
Athens GA CDBG ENSAT
Expansion 










4,000,000
 50
Athens GA CDBG Rocksprings
Park
Revitaliza3on 










4,000,000
 50
Athens GA CDBG Police
HQ
Renova3on 










4,000,000
 75
Athens GA CDBG ACC
Library
Expansion 








16,000,000
 100
Athens GA Energy Courthouse
Boiler
HVAC
Replacement



 












133,000
 5
Athens GA Energy Courthouse
Air
Handler,
Supply
Fan
,
Evaporator
Coil
‐
HVAC
Replacement
 












100,000
 10
Athens GA Energy Police
Roof
Top
Units
‐
HVAC
Replacement

 














88,000
 10
Athens GA Energy Civic
Hall
Roof
Replacement
 














81,000
 15
Athens GA Energy Costa
Building
Roof
Replacement


 














85,000
 15
Athens GA Energy Fleet
Management
Roof
Replacement
 














84,000
 15
Athens GA Energy Library
Cooling
Tower
&
Chillers
‐
HVAC
Replacement
 












263,000
 15
Athens GA Energy Energy
Audit
Courthouse 














59,000
 20
Athens GA Energy Energy
Management
Control
System
Dougherty
St.
Building

 












350,000
 20
Athens GA Energy Energy
Management
Control
System
Satula
Building

 












350,000
 20
Athens GA Energy Fire
Sta3on
#
6
Roof
Replacement

 












138,000
 20
Athens GA Energy Fire
Sta3on
#2
Roof
Replacement
 












138,000
 20
Athens GA Energy Energy
Audit
Jail

 














74,000
 25
Athens GA Energy Energy
Management
Control
System
Courthouse

 












450,000
 25
Athens GA Energy Mental
Health
Building
Roof
Replacement

 












205,000
 25
Athens GA Energy Energy
Management
Control
System
Jail

 












900,000
 40
Athens GA Energy Jail
Roof
Replacement

 












464,000
 40
Athens GA Public
Safety Purchase
40
patrol
cars
that
are
5
years
old
or
older
with
U.S.
electric
or
hybrid
cars

 










1,175,000

Athens GA Public
Safety Upgrade
to
digital
video
cameras
for
all
patrol
cars 












650,000
 2
Athens GA Public
Safety CAD
Upgrades 










2,000,000
 5
Athens GA Public
Safety Reinstate
Byrne
grant
for
local
drug
task
force
to
provide
detec3ve
jobs
and
restrict
drug
sales
and
use 












500,000
 6
Athens GA Public
Safety 27
addi3onal
police
officers
to
reduce
crime
and
expand
CID
staffing 










1,092,691
 27
Athens GA Streets/Roads Construct
three
(3)
miles
of
sidewalks 












505,000
 3
Athens GA Streets/Roads Fowler
Mill
Drive
Bridge
Deck
Replacement:
The
replacement
of
the
bridge
deck
of
the
Fowler
Mill
Drive
bridge
over
Lifle
Bear
Creek
to
address
excessive

corrosion
on
the
underside
of
the
exis3ng
steel
bridge
deck. 












300,000
 6
Athens GA Streets/Roads Barnef
Shoals
Road/
Old
Lexington
Road
Intersec3on:

The
realignment
of
Old
Lexington
Road
to
intersect
with
Barnef
Shoals
Road
at
a
tradi3onal
90‐degree
angle

with
the
installa3on
of
a
traffic
signal. 










1,110,000
 12
Athens GA Streets/Roads Mitchell
Bridge
Road
Widening:
The
widening
of
Mitchell
Bridge
Road
between
the
Atlanta
Highway
and
Athens
West
Parkway
to
a
consistent
3‐
lane
cross
sec3on
to
allow
for
a
con3nuous
center,
two‐way
leb‐turn
lane. 












700,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Athens GA Streets/Roads Mitchell
Bridge
Road/Athens
West
Parkway
Intersec3on:
The
realignment
of
the
exis3ng
three‐legged
intersec3on
to
a
four‐legged
intersec3on
with
the
newly

constructed
street,
The
Preserve,
serving
as
the
fourth
leg
of
the
intersec3on.

Included
in
th 












950,000
 12
Athens GA Transit Increase
Fix‐Route
(Bus)
Opera3ng
and
Maintenance
Funding
to
help
stabilize
fare
increases;
and
improve

reliability,
and
increase
frequency 












750,000
 5
Athens GA Transit Athens
Transit
Bus
Stop
Improvement
Program 










1,000,000
 15
Athens GA Transit Athens
Transit
Bus
Storage
/
Parking
Area
Expansion 










5,000,000
 25
Athens GA Water Boulevard
stormwater
project
to
alleviate
flooding
along
Boulevard
and
adjacent
proper3es 












340,000
 3
Athens GA Water Cleveland
Avenue
stormwater
project
to
alleviate
flooding
of
Cleveland
Avenue
and
surrounding
proper3es

(including
the
Railroad) 












400,000
 3
Athens GA Water Cobb
Street
stormwater
project
to
alleviate
flooding
throughout
the
Cobbham
neighborhood
street
network

and
surrounding
proper3es 












955,000
 3
Athens GA Water Poplar
Street/Branch
Street
stormwater
project
to
alleviate
flooding
of
the
roadway
and
surrounding

proper3es 












305,000
 3
Athens GA Water Dredge
Lagoon
@
Water
Treatment
Plant 










1,000,000
 10
Athens GA Water Retrofit
Clarifiers
@
Middle
Oconee
WRF 










1,000,000
 10
Athens GA Water Extend
Public
Water
Mains
along
public
roadways
not
currently
served
by
public
water
service 










2,000,000
 15
Athens GA Water Access
Bridge
to
North
Oconee
WRF 










4,500,000
 20
Athens GA Water Shoal
Creek/Whit
Davis
Rd.
Sanitary
Sewer
Pump
Sta3on/Force
Main 










5,200,000
 30
Athens GA Water Renovate
Exis3ng
Building
for
Public
U3li3es
Customer
Service
Center 










2,800,000
 40
Athens GA Water Trail
Creek
#3
&
#4
Interceptor
Sewer
Project 










2,000,000
 40
Atlanta GA Airport Maynard
Jackson
Interna3onal
Terminal 






500,000,000
 5000
Atlanta GA CDBG Police
facility
improvements
for
Zone
1,
Zone
3
and
Zone
4
(plumbing,
electrical
and
other
maintenance) 












185,000
 2
Atlanta GA CDBG Parks
‐
Drainage
Structures 












750,000
 8
Atlanta GA CDBG Parks‐
Curbing
Installa3on 












750,000
 8
Atlanta GA CDBG Parks
‐
Driveways
and
Parking
Lots 












950,000
 10
Atlanta GA CDBG Parks
‐
Retaining
Walls
and
Slopes 












980,000
 10
Atlanta GA CDBG Parks
‐
Sidewalks
and
Pathways 










1,050,000
 11
Atlanta GA CDBG Tree
Canopy
Preserva3on
‐
Invasive
Removal 










1,500,000
 15
Atlanta GA CDBG Parks‐
Water
Line
Backflow
Preventers 










2,475,000
 25
Atlanta GA CDBG Historic
City
Hall
and
Annex
Repair
Projects 










3,400,000
 34
Atlanta GA CDBG Deten3on
Center
Repairs 










3,800,000
 38
Atlanta GA CDBG Develop
Swat
Pistol
Range
to
replace
trailers
used
for
training
and
upgrade
Mounted
Training
Area 










3,835,700
 39
Atlanta GA CDBG Replace
8
Fire
Sta3ons
that
are
over
50
years
old
and
under
poor
condi3ons 








24,000,000
 240
Atlanta GA CDBG Build
Consolidated
Mul3‐Use
Public
Safety
Training
Facility
to
meet
cri3cal
training
needs
 








28,000,000
 280
Atlanta GA CDBG Renova3on
of
25
Neighborhood
Recrea3on
Centers 








39,500,000
 395
Atlanta GA Energy Install
low‐flow
plumbing
fixtures 










2,107,822
 21
Atlanta GA Energy Replace
inefficient
ligh3ng
with
high‐efficiency
ligh3ng,
and
install
automa3c
ligh3ng
controls 










4,117,854
 29
Atlanta GA Energy Upgrade
building
envelopes,
including
installa3on
of
reflec3ve
of
green
roofing,
insula3on,
and
high‐
performance
windows
and
doors. 










5,515,468
 55
Atlanta GA Energy HVAC
system
efficiency
upgrades,
including
replacement
of
inefficient
equipment
with
high‐performance

systems,
installa3on
of
automa3c
controls,
and
recomissioning
of
exis3ng
systems 








12,673,636
 100
Atlanta GA Energy Install
waste‐to‐energy
recovery
systems
(fuel
cells,
microturbines,
and
gasifica3on
systems)
to
convert
waste

energy
sources
(landfill
gas,
wastewater
treatment
system
gas,
yard
waste,
and
waste
grease)
to
renewable

electricity
for
city
government
opera3ons 








13,000,000
 130
Atlanta GA Energy Install
solar
thermal
and
photovoltaic
systems 








52,390,000
 524
Atlanta GA Energy Green
Fleet‐
hybrid
and
electric
vehicles,
biodiesel
and
biodiesel
fueling
sta3on,
fuel
cell
pilot
program 








64,000,000
 550
Atlanta GA Public
Safety Hire
200
Police
Officers 








20,000,000
 200
Atlanta GA Streets/Roads Bridge
Maintenance
and
Repairs 










1,800,000
 18
Atlanta GA Streets/Roads Streetlights 








10,200,000
 102
Atlanta GA Streets/Roads Traffic
Communica3ons 








18,000,000
 180
Atlanta GA Streets/Roads Traffic
Signals
&
School
Flashers 








29,400,000
 294
Atlanta GA Streets/Roads Hazardous
Sidewalk
Repairs 








50,000,000
 500
Atlanta GA Streets/Roads Bridge
Replacement 








75,000,000
 750
Atlanta GA Streets/Roads Street
Resurfacing 






120,000,000
 1200
Atlanta GA Transit Travel
Demand
Model
and
Engineering
for
Beltline
Transit
and
Trail 










6,000,000
 60
Atlanta GA Transit 5
Miles
of
Beltline
Trail
and
Spur
Trails 








18,000,000
 180
Atlanta GA Transit Streetcar
East‐West
line
‐2.27
miles,
9
sta3ons,
2
cars 








40,000,000
 400
Atlanta GA Transit Streetcar
Midtown‐Downtown
line
‐
3.6
miles 








81,000,000
 600
Atlanta GA Water Hemphill
WTP
Electrical
Switchgear
Replacement 










1,270,000
 13
Atlanta GA Water Proctor
Creek
Basin
‐
East
Proctor
Capacity
Relief
Project 










2,800,000
 28
Atlanta GA Water Downtown
Elevated
Storage
Tank 










4,215,400
 42
Atlanta GA Water Automa3on
of
the
Hemphill
and
Chafahoochee
Water
Treatment
Plants 










6,600,000
 66
Atlanta GA Water Proctor
Creek
Basin
‐
Terrell
Creek
Replacement
Project 










8,700,000
 87
Atlanta GA Water Water
Tank
Pain3ng
&
Structural
Repair 










9,112,880
 91
Atlanta GA Water Year
2011
Small
Diameter
Capacity
relief
Projects
‐
Pipeburs3ng 








10,500,000
 105
Atlanta GA Water Sewer
Group
5
&
6
‐
SSES
Contract
A 








15,000,000
 150
Atlanta GA Water Sewer
Group
5
&
6
‐
SSES
Contract
B 








15,000,000
 150
Atlanta GA Water South
River
Basin
‐
East
Point
Trunk
Replacement 








17,800,000
 178
Atlanta GA Water Hemphill
Finished
Water
Pump
Sta3on 








19,400,000
 194
Atlanta GA Water Southwest
Main
Improvements
30‐inch 








20,700,000
 207
Atlanta GA Water South
River
Basin
‐
North
South
Basin
Capacity
Relief
Projects 








22,315,000
 223
Atlanta GA Water North
Area
Main
Improvements 








22,522,000
 225
Atlanta GA Water Adamsville
Transmission
Main
Improvements 








22,926,000
 229
Atlanta GA Water Fairburn
Road
Water
Mains 








29,937,000
 299
Atlanta GA Water Fairburn
Road
Water
Mains 








32,000,000
 320
Atlanta GA Water Koweta
Rd.
Water
Main
&

Pumping
Sta3on 








38,061,000
 381
City State Program Project
Descrip3on Funding
Required Jobs
Atlanta GA Water Southwest
Main
54
inch 








41,225,703
 412
Atlanta GA Water Adamsville
Transmission
Main
Improvements 








42,343,100
 423
Atlanta GA Water Georgia
Tech/Mid3wn
Water
Main
Replacement 








43,363,000
 434
Atlanta GA Water Koweta
Rd.
Water
Main
&

P.
S. 








54,850,000
 549
Atlanta GA Water Southwest
Main
Improvements
30‐inch 








56,000,000
 560
Atlanta GA Water South
River
Capacity
Relief
Tunnel
and
Pumping
Sta3on 






111,684,927
 1117
College
Park GA Streets/Roads Citywide
Asset
Inventory 












210,000
 11
College
Park GA Water Water
Line
Extension‐‐
Extension
of
approx.
2000
linear
feet
of
12
inch
waterline 










2,500,000
 13
College
Park GA Water Best
Road
Sewer
Improvements‐‐Replacement
of
approximately
2200
linear
feet
of
10
inch
sanitary
sewer.











3,000,000
 15
College
Park GA Water Various
Sewer
Improvements
of
approx.
5000
linear
feet 










3,000,000
 21
College
Park GA Water Sanitary
Sewer
Extension‐‐Extension
of
approx.
4000
linear
feet
of
sanitary
sewer 










4,500,000
 24
College
Park GA Water Various
Water
line
upgrades
of
approx.
5000
linear
feet 










3,500,000
 30
College
Park GA Water REgional
Stormwater
Deten3on
Facility‐‐provide
offsite
stormwater
deten3on
for
downtown
development 










6,000,000
 33
College
Park GA Water Various
Stormwater
Projects
of
approx.
5000
linear
feet 










7,500,000
 40
Conyers GA CDBG To
augment
recent
expansions
the
Georgia
Interna3onal
Horse
Park
is
in
need
of
addi3onal
public
facili3es

including
a
public
use
building
that
would
house
mee3ng
space
and
public
restrooms
in
an
area
of
the
park

current
served
by
portable
facili3es 














80,000
 10
Conyers GA CDBG The
Georgia
Interna3onal
Horse
Park
is
in
need
of
addi3onal
full
service
RV
spots
that
can
accommodate
the

increase
in
the
number
of
visitors
coming
to
the
park
for
events
as
a
result
of
the
mul3‐million
dollar
expansion

at
the
park. 












250,000
 20
Conyers GA CDBG This
project
involves
the
construc3on
of
an
indoor
arena
with
adjacent
parking.

To
provide
an
85,000
square

foot
arena
would
cost
an
es3mated
$35
million
dollars
and
addi3onal
adjacent
parking
would
be
an
addi3onal

es3mated
$1
million.

The
construc 








36,000,000
 470
Conyers GA Housing This
project
involves
the
construc3on
of
approximately
70
new
public
housing
units
to
replace
units
that
are

over
50
years
old.

This
units
currently
need
considerable
upgrading
and
re‐condi3oning.

These
70
units
would

be
relocated
to
an
area
beside
th 










5,500,000
 250
Conyers GA Public
Safety General
Dynamics’
ruggedized
laptops
would
be
a
great
solu3on
for
Criminal
Inves3ga3ons
Personnel

worksta3ons.
Since
these
laptops
are
fully
ruggedized
they
can
be
taken
anywhere
in
the
field
without
fear
of

damaging
the
computer.
 














40,000
 3
Conyers GA Public
Safety VMware
is
a
collec3on
of
sobware
that
can
be
used
for
several
infrastructure
improvements.
VMware
would

give
us
the
ability
to
place
several
public
safety
servers
onto
two
iden3cal
servers.














120,000
 5
Conyers GA Public
Safety 
Live
Scan
Portables

This
solu3on
could
be
used
by
Criminal
Inves3ga3ons
Unit
and
Field
Service
Units
for
the

instant
iden3fica3on
of
suspects
in
the
field.
They
could
also
be
used
by
CID
to
fingerprint
suspects
at
the
PD

or
in
the
field
for
the
pur 












220,000
 6
Conyers GA Streets/Roads This
project
would
involve
the
widening
of
a
city
street
used
as
a
primary
source
of
ingress
and
egress
to
the

historic
downtown
area
of
Conyers.


The
construc3on
would
involve
some
widening
of
the
roadway,
sidewalks

and
the
milling
and
paving
of
the
cu 












400,000
 30
Conyers GA Streets/Roads 
This
project
would
involve
the
widening
and
upgrading
of
an
integral
street
leading
into
the
historic
downtown

area
of
Conyers.

Currently
the
road
is
substandard
in
width
and
condi3on
to
handle
the
daily
loads
of
traffic

using
this
route
into
the
histo 










1,800,000
 65
Hinesville GA CDBG Azalea
Street
Redevelopment
Phase
II
&
III 










5,000,000
 75
Hinesville GA Housing Hinesville
Housing
Authority 












700,000
 60
Hinesville GA Public
Safety Hinesville
Fire
Dept. 












250,000

Hinesville GA Public
Safety Hinesville
Police
Dept. 












400,000

Hinesville GA Streets/Roads Memorial
Drive
Realignment 










5,000,000
 32
Hinesville GA Transit Liberty
Transit 












700,000

Hinesville GA Water Hinesville
Water
Reclama3on
Project 










2,000,000

Macon GA Airport Middle
GA
Regional
Airport:
purchase
1,500‐gal
aircrab
rescue
&
firefigh3ng
vehicle
for
commercial
aircrab

and
Robins
AFB
backup
 












800,000
 2
Macon GA Airport Herbert
Smart
Airport:
relocate
public
roadway,
lengthen
runway
10‐28
to
5,000
b,
improve
runway
safety

areas,
construct
parallel
taxiway 










4,800,000
 42
Macon GA Airport Middle
GA
Regional
Airport:
filling,
grading,
drainage,
erosion
control
improvements
to
create
marketable

industrial
property. 










3,800,000
 125
Macon GA CDBG Demolish
and
clear
backlog
of
300
blighted,
condemned
proper3es
 










6,000,000
 25
Macon GA CDBG Create
20‐acre,
passive
&
ac3ve
recrea3on
complex
in
historically
unserved
neighborhood
at
former
Durr's

Lake
property 










5,000,000
 120
Macon GA Energy Energy‐efficient
hea3ng/ven3la3on/AC
systems
for
41
schools
(30
are
Title
1) 








15,218,310
 194
Macon GA Housing Construct
central
laundry;
install
unvented
washer‐dryer
units
at
Vineville
Senior
Housing 












409,000
 10
Macon GA Housing Landscaping
improvements
at
Bowden,
Felton,
Anthony
Homes 














50,000
 10
Macon GA Housing Replace
waterlines/main
at
Bloomfield
Way 












275,000
 10
Macon GA Housing Repair
covered
storm
pipes
at
Anthony
Homes 












150,000
 12
Macon GA Housing Public
housing
site
work/concrete
repairs
at
Tindall
Hts;
Bowden,
Murphey,
Pendleton,
Felton
Homes 










1,290,000
 40
Macon GA Housing Construct
50
new
single‐family
in‐fill
houses
for
low‐income
families
to
support
2009
HOPE
VI
applica3on 










5,000,000
 50
Macon GA Housing Felton
Homes
apartment
entrance
facade,
to
support
2009
HOPE
VI
applica3on 










2,800,000
 50
Macon GA Housing Replace
windows;
replace
deteriorated
3les,
kitchen
cabinets,
and
clothesline
posts
at
Pendleton
Homes 










1,450,000
 50
Macon GA Housing Public
housing:
Replace
shingle
roofs
at
Tindall
Hts;
McAfee
Tower;
Bowden,
Felton,
Mounts
Homes
 












814,000
 55
Macon GA Housing Abatement,
demoli3on,
infrastructure
installa3on
for
100
new,
single‐family
replacement
units
to
support

2009
HOPE
VI
applica3on 










2,500,000
 75
Macon GA Public
Safety Purchase
infrastructure
&
equipment
for
mul3‐agency,
direct
interoperable
communica3ons
to
address
gaps
in

regional
strategic
plan
 










9,885,300
 2
Macon GA Schools Telecommunica3ons
and
instruc3onal
technology
upgrades
for
43
schools
(28
are
Title
1)











8,800,000
 37
Macon GA Schools Energy‐efficient
hea3ng/ven3la3on/AC
system,
building
finishes,
access
control
for
school
administra3on

facility 










4,057,550
 52
Macon GA Schools Security
cameras,
security
ligh3ng,
access
control,
athle3c
facili3es/fields
at
16
schools
(11
are
Title
1)









19,622,906
 353
City State Program Project
Descrip3on Funding
Required Jobs
Macon GA Schools Retrofit
roofs;
ADA
modifica3ons;
security
cameras/ligh3ng/access
control;
building/equipment
renova3ons
at

22
schools
(17
are
Title
1) 








40,349,565
 562
Macon GA Transit Construct
Macon
Transit
Authority
bus
fleet
maintenance
facility
to
replace
demolished
structure 










4,000,000
 50
Macon GA Transit Rehabilitate
Macon
Intermodal
Terminal
Sta3on
(Phase
II):
replace
rear
roof
canopy
&
HVAC;
construct

downtown
250‐space
parking
facility. 










5,000,000
 136
Macon GA Water Repair/Replace
deteriorated
stormwater
drainage
system
in
historic
downtown
and
in
other
areas
with
high

public
safety,
flood
control,
and/or
job
impact
 










3,007,000
 276
Mariefa GA CDBG Charles
Avenue
Drainage
Improvements
‐
project
is
to
construct
500
feet
of
storm
pipe,
inlets
and
curb
and

gufer
to
improve
drainage
within
an
older
residen3al
area
to
minimize
property
damage 














75,000
 10
Mariefa GA CDBG Roswell
Road
Sidewalk‐
project
is
to
construct
a
sidewalk
along
and
exis3ng
5
lane
road,
total
project
length
is

1830
linear
feet
and
extends
pedestrian
connec3vity
to
the
downtown
business
district. 












215,000
 10
Mariefa GA CDBG Wylie
Road
Sidewalk
‐
project
is
to
construct
a
sidewalk
with
slight
road
modifica3ons
for
safety
purposes,
to

allow
residents
along
the
corridor
to
safely
walk
to
public
transit
loca3ons.

Total
project
length
is
1050
linear

feet 












228,765
 10
Mariefa GA CDBG Burnt
Hickory
Sidewalk
‐
2500
linear
foot
sidewalk
project
between
Whitlock
Avenue
and
Devonwood
Trail
to

promote
pedestrian
access
and
improve
sidewalk
connec3vity
in
western
por3on
of
the
city 












162,500
 12
Mariefa GA CDBG Renaissance
District
‐
project
is
to
construct
intersec3on
improvements,
crosswalks,
sidewalks
and
gateway

improvements
in
an
urban
renewal
por3on
of
the
downtown
area 












953,654
 16
Mariefa GA Public
Safety Domes3c
Violence
Response
/
Preven3on
Inves3gator 














71,300
 1
Mariefa GA Public
Safety Community
Outreach
Officers 












142,600
 2
Mariefa GA Public
Safety Community
Services
Representa3ves 












127,700
 2
Mariefa GA Public
Safety School
Resource
Officers 












142,600
 2
Mariefa GA Schools Add
school‐wide
wireless
access
to
Mariefa
High
School 












151,830
 0
Mariefa GA Schools Add
solar
panels
to
athle3c
areas
at
Mariefa
Middle
School
and
Mariefa
High
School 












500,000
 0
Mariefa GA Streets/Roads Alexander
Street
Reconstruc3on
‐
project
includes
the
reconstruc3on
and
widening
of
550
linear
foot
of

exis3ng
roadway
in
the
downtown
business
area 












330,000
 11
Mariefa GA Streets/Roads Lake
Drive
and
South
Mariefa
Parkway
Intersec3on
Improvements
‐
project
includes
the
addi3on
of
a
right

turning
lane,
intersec3on
and
drainage
improvements
to
improve
safety
at
an
exis3ng
intersec3on 












250,000
 12
Mariefa GA Streets/Roads Kennesaw
Avenue
Bridge
‐
project
is
to
replace
an
exis3ng
bridge
with
an
42
foot
arch
culvert
and
widen

bridge
to
accommodate
future
road
and
sidewalk
expansion
for
a
major
vehicular
and
pedestrian
corridor
into

the
downtown
business
district 












750,000
 18
Mariefa GA Streets/Roads Roswell
Street
‐
1,500
linear
foot
road
widening
project
between
Olive
Street
and
Fairground
Street
to
add

capacity
and
upgraded
pedestrian
access
along
a
main
corridor
into
the
downtown
area 










1,443,114
 20
Mariefa GA Water Olley
Basin
@
Bellemeade
Sewer
Replacement 












450,000
 9
Mariefa GA Water Rofenwood
Basin
@
Smithstone
Sewer
Rehab. 












350,000
 9
Mariefa GA Water Sewer
System
Improvements 










1,200,000
 9
Mariefa GA Water Water
System
Improvements
Project 












800,000
 9
Savannah GA CDBG Pedestrian
Walkway:
Build
a
pedestrian
walkway
on
exis3ng
public
right‐of‐way
between
Williamson
and
W.

River
streets
to
increase
public
safety,
reduce
blight
and
increase
economic
development 












125,000
 1
Savannah GA CDBG Downtown
Naviga3on
System:
Implement
a
coordinated
and
visible
naviga3on
system
to
encourage
the
use
of

parking
facili3es,
reduce
traffic
conges3on
and
engage
in
a
pedestrian
experience 










1,062,500
 4
Savannah GA CDBG Children's
Museum:
Funding
to
complete
the
infrastructure
necessary
to
house
the
Savannah
Children's

Museum
on
the
Baflefield
Park
site 










2,000,000
 6
Savannah GA CDBG Fire
Department
Building
Maintenance
and
Construc3on:
Renovate
fire
training
burn
building;
repair

infrastructure
including
overhead
doors,
paving
and
drainage
improvements;
construct
a
support
facility
to

serve
as
a
central
equipment
storage
and
repair 










1,177,000
 10
Savannah GA CDBG Stormwater
Upgrades:
Replace/
rehabilitate
deteriora3ng
brick
storm
lines
with
concrete
pipe
of
structural

liner 










1,100,000
 12
Savannah GA CDBG Visitor's
Informa3on
Center
Renova3ons
&
Maintenance:
Complete
interior
renova3ons
of
the
VIC
to
improve

the
visitor
experience,
enhance
the
func3onality
of
the
historic
building,
improve
ADA
accessibility
and

increase
the
direct
spending
of
visitors; 










3,600,000
 12
Savannah GA CDBG Savannah
Gardens:
This
project
involves
the
City
of
Savannah
assis3ng
a
non‐profit
en3ty
in
its
redevelopment

of
an
affordable
housing
development.
The
site
will
be
redeveloped
into
a
mixed
use,
mixed
income

community.
This
community
will
add
to
the
inv 










5,000,000
 15
Savannah GA CDBG Buildings
&
Grounds/
Public
Improvements:
Construct
a
new
center
to
serve
the
Fernwood
neighborhood;

Upgrade
HVAC
equipment
&
roofs
in
City
facili3es;
Demolish
and
replace
pool
building
in
new
loca3on
as
per

Daffin
Master
Plan 










6,000,000
 20
Savannah GA CDBG Public
Recrea3on
Enhancements:
Install
nature
trails,
exhibit
areas,
nature
&
interpreta3on
areas;
and

observa3on
areas
for
wildlife;
convert
exis3ng
marina
in
Coffee
Bluff
for
public
use
and
build
a
fishing
pier;

Upgrade
sobball
complex
building 










2,300,000
 20
Savannah GA CDBG City
Office
Building:
Restore
and
renovate
the
old
Waterworks
structure
into
City
office
building 








12,926,000
 30
Savannah GA CDBG Pennsylvania
Avenue
Corridor
Revitaliza3on:
This
corridor
has
also
experienced
disinvestment
over
the
past

thirty
years.
This
corridor
cuts
through
the
Savannah
Gardens
projects.
The
development
of
that
project
has

sparked
discussion
of
a
wider
revitaliz 










5,000,000
 30
Savannah GA CDBG Public
Arena:
The
ci3zens
of
Savannah
voted
in
favor
of
dedica3ng
Special
Purpose
Local
Op3on
Sales
Tax

(SPLOST)
to
the
development
of
a
public
arena.
The
SPLOST
funding
will
be
used
to
acquire
land
and
begin
the

construc3on
design
for
the
arena.
Addi 








40,000,000
 30
Savannah GA CDBG Waters
Avenue
Corridor
Revitaliza3on:
This
project
will
entail
using
various
revitaliza3on
strategies
to
improve

a
major
corridor
within
the
city's
CDBG
Target
Area.
The
corridor
has
seen
disinvestment
over
the
past
thirty

years.
 










5,000,000
 30
Savannah GA CDBG City
Streets
Maintenance:
Install
curbing
and
gufer
to
Edgemore
and
Sackville
subdivision
streets;
Install
ADA

compliant/
accessible
ramps
at
loca3ons
in
the
historic
district;
Maintain
&
make
repairs
to
the
City's
bridges;
 








18,664,154
 35
Savannah GA CDBG City
Services
Complex:
Develop
newly‐acquired
Interchange
Drive
site
for
various
City
services
and
opera3ons 








81,805,000
 50
Savannah GA CDBG Renova3on
and
upgrades
to
historic
Savannah
Chatham
Metropolitan
Police
Department,
201
Habersham.


The
structure
is
139
years
old
and
listed
on
the
Na3onal
Historic
Register.

Upgrade
and
meet
Federal

Homeland
Security
guidelines
for
Public
Safety
stru 








31,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Savannah GA CDBG Public
Improvements
to
Savannah
River
Landing
Tax
Alloca3on
Districts
(54‐acres):
The
public
improvements
to

be
made
within
the
TAD
include
improvements
to
the
area's
basic
water,
sewer,
and
transporta3on

infrastructure;
roadway
improvements
&
enhanceme 








57,597,165
 55
Savannah GA Energy Implement
Biodiesel
(B20)
in
City
fleet 












150,000
 2
Savannah GA Energy Energy
audits
and
retrofits
of
exis3ng
City
facili3es
(install
occupancy
sensors
in
conference
&
mee3ng
rooms,

improve
flourescent
ligh3ng
efficiency,
install
more
efficient
water
using
fixtures,
install
energy
management

controllers
on
snack
vending 










1,000,000
 4
Savannah GA Housing Hitch
Village
Mold
Remedia3on
for
approximately
100
units 












690,704
 5
Savannah GA Housing Paferson
Terrace
Central
HVAC,
Security
Screens,
New
Cabinets
&
Countertops 










1,139,693
 8
Savannah GA Housing Sustainable
Fellwood
Phase
I
New
Development
of
Former
Public
Housing
Site 










3,100,000
 21
Savannah GA Public
Safety City
Hall
Security:
Upgrade
security
(police
officers,
camera
systems,
sobware,
magnet
backup
locking
system)

for
City
Hall
and
BMB 












500,000
 3
Savannah GA Public
Safety Vehicle
Simulator:
Provide
a
facility
for
City‐wide
vehicle
simulator
training
to
reduce
spending
on
accidents

involving
City
vehicles 












320,000
 4
Savannah GA Public
Safety Narco3cs
Enforcement
with
Savannah
Chatham
Metro
Police
Department,
City
of
Savannah
which
would

include
officers,
support
personnel,
and
equipment 










1,829,258
 31
Savannah GA Water Air
Quality
Enhancements
to
President
Street
Plant 










2,000,000
 10
Savannah GA Water Dean
Forest
Waterline:
Line
to
serve
potable
water
to
a
mega‐site 










3,000,000
 12
Savannah GA Water Reclaimed
Water
Piping:
install
infrastructure
south
of
President
Street
Plant
to
provide
supply
to
areas
south

of
plant 








15,000,000
 20
Savannah GA Water Reclaimed
Water
Piping:
installa3on
of
infrastructure
from
Crossroads
Plant
to
Airport 










5,400,000
 20
Savannah GA Water Wilshire
Plant
Decommissioning:
conversion
of
wastewater
treatment
plant
effluent
line
to
pump
sewage
to

President
Street
Plan
and
enhance
site
to
a
public
park 










1,200,000
 25
Savannah GA Water Alterna3ve
Biosolids
Processing
and
Disposal 








40,000,000
 30
Hawaii
County HI CDBG Public
Works
Facili3es
ADA
compliance,
island‐wide
facili3es
in
ADA
compliance
B
Priority
and
C
Priority
in

accordance
with
county
self‐evalua3on
and
transi3on
plan
for
accessibility
to
public
facili3es
 










4,000,000
 8
Hawaii
County HI CDBG ADA
Curb
Ramp
Compliance
Program,
Waimea.
Replace
sidewalks
and
install
curb
ramps
to
comply
with
FHWA

seflement
agreement 










1,000,000
 9
Hawaii
County HI CDBG Hawaiian
Ocean
View
Estates
Hurricane
Shelter
and
Community
Center,
provide
hardened
shelter
and

community
center
facili3es
to
an
economically
disadvantaged
area
with
about
5,000
residents
that
is
more

than
30
miles
from
the
nearest
state‐approved
shelte 










6,000,000
 50
Hawaii
County HI CDBG Hawaiian
Paradise
Park
Subdivision
District
Park,
development
of
20‐acre
park
site
in
rapidly
growing

subdivision
with
severely
underserved
recrea3onal
needs
in
an
economically
disadvantaged
area 








10,000,000
 60
Hawaii
County HI CDBG Construct
police
sta3on
in
economically
disadvantaged
Pahoa
village
next
to
new
fire
sta3on
to
centralize

public
safety
services
in
an
area
visible
and
accessible
to
the
public. 










4,600,000
 100
Hawaii
County HI CDBG Island‐wide
accessibility
improvements
and
removal
of
architectural
barriers
for
Parks
to
meet
ADA

requirements 








10,000,000
 100
Hawaii
County HI CDBG Puna
Gymnasium
and
ball
fields,
development
of
indoor
recrea3onal
spaces
and
outdoor
fields
for

economically
disadvantaged
community
with
severely
underserved
recrea3onal
needs
 








15,000,000
 102
Hawaii
County HI CDBG Construct
Makalei
Fire
Sta3on
to
improve
response
3mes
to
communi3es
currently
served
by
personnel
and

vehicles
seven
miles
away,
reducing
fire
insurance
costs. 










9,000,000
 121
Hawaii
County HI CDBG Construct
a
new
police
sta3on
in
Captain
Cook
for
current
and
future
public
safety
needs
in
South
Kona,

including
a
firing
range
for
police
department
training.
Property
has
been
acquired
next
to
an
exis3ng
police

substa3on. 








18,000,000
 200
Hawaii
County HI Energy Replace
exis3ng
street
lights
with
energy
efficient
lights
on
exis3ng
poles
island‐wide.
Island
of
Hawaii
has

some
of
the
highest
electricity
rates
in
the
na3on. 










1,000,000
 2
Hawaii
County HI Energy Energy
retrofits
for
county‐owned
mul3‐family
elderly
housing
projects
at
Ouli
Ekahi
in
Kawaihae
and

Kulaimano
Elderly
Housing
in
Pepeekeo;
Island
of
Hawaii
has
some
of
the
highest
electricity
rates
in
the
na3on.













900,000
 20
Hawaii
County HI Energy DPW
Facili3es
Energy
Systems
will
build
solar
energy
systems,
high‐efficiency
equipment
replacements
and

other
building
energy
efficiency
improvements. 










4,000,000
 30
Hawaii
County HI Energy Install
Kealakehe
Wastewater
Plant
Photovoltaic
System
to
reduce
electrical
costs
and
reduce
reliance
on

imported
oil 










7,000,000
 30
Hawaii
County HI Energy Installa3on
of
solar
energy
systems
in
homes
for
very
low
income
elderly
and
disabled
homeowners;
Island
of

Hawaii
has
some
of
the
highest
electricity
rates
in
the
na3on 












500,000
 90
Hawaii
County HI Energy Provide
low‐interest
loans
to
homeowners
to
retrofit
to
increase
energy
efficiency;
Island
of
Hawaii
has
some

of
the
highest
electricity
rates
in
the
na3on. 










1,000,000
 180
Hawaii
County HI Housing Construct
Kaloko
Housing
Project
to
develop
24
transi3onal
units
for
the
homeless
and
72
affordable
rentals
on

a
county‐owned
parcel;
needed
to
prepare
for
the
impending
closure
of
the
only
homeless
shelter
in
West

Hawaii

 








18,000,000
 85
Hawaii
County HI Public
Safety Upgrade
land‐mobile
radio
public
safety
communica3ons
system
and
migrate
system
to
700‐800MHz
range
to

comply
with
FCC
mandate.
Improves
public
safety
and
emergency
response
by
adding
radio
coverage
to
areas

of
the
island
that
are
now
without
coverage.
 








89,000,000

Hawaii
County HI Public
Safety Informa3on
technology
disaster
mi3ga3on
to
move
mission‐cri3cal
network
and
informa3on
infrastructure
to

non‐hazardous
zones.
Will
ensure
voice
and
data
capabili3es
in
3mes
of
crisis. 










1,200,000
 6
Hawaii
County HI Streets/Roads Traffic
signal
upgrades
from
Traconex
control
cabinets
to
170s,
10
signal
loca3ons
to
provide
addi3onal

controller
capabili3es
for
signal
coordina3on
and
standby
power
during
power
interrup3ons

 










1,000,000
 3
Hawaii
County HI Streets/Roads Hokulia
Bypass
traffic
calming
measures,
four
new
signals
and
markings,
all
mi3ga3on
needed
due
to
par3al

opening
of
new
bypass
road 










2,050,000
 4
Hawaii
County HI Streets/Roads Kawailani/Pohakulani/Ainaola/Iwalani
Traffic
signal
improvements
to
install
synchronized
signals,
acquire

property
for
highway
realignment
and
make
drainage
improvements
to
improve
vehicle
and
pedestrian
safety



 










2,500,000
 4
Hawaii
County HI Streets/Roads Highway
Division
Office
Extension,
addi3onal
Hilo
office
space
required
for
addi3onal
personnel
to
manage

roadway
responsibili3es

 










1,000,000
 7
City State Program Project
Descrip3on Funding
Required Jobs
Hawaii
County HI Streets/Roads Replacement
of
Puna
Highway
Maintenance
Warehouse,
which
is
currently
inadequate
and
no
longer
used.

Needed
to
secure
storage
of
equipment
and
supplies.
Addi3onal
space
needed
to
address
addi3onal
roadway

responsibili3es. 










1,000,000
 7
Hawaii
County HI Streets/Roads South
Hilo
Highway
Baseyard
Storage
to
replace
equipment
storage
warehouse

that
had
to
be
demolished

aber
the
roof
was
damaged
in
high
winds. 










1,000,000
 7
Hawaii
County HI Streets/Roads South
Kohala
Baseyard
Storage
to
replace
inadequate
exis3ng
facility
and
secure
equipment
and
supplies. 










1,000,000
 7
Hawaii
County HI Streets/Roads West
Hawaii
Maintenance
Facility,
replace
exis3ng
building
in
Kealakekua
with
shops
and
offices
for
Public

Works'
traffic
building
and
automo3ve
divisions 










3,500,000
 14
Hawaii
County HI Streets/Roads Hamakua
Highway
Maintenance
Base
Yard
to
replace
exis3ng
metal
quonset
hut
that
no
longer
meets
safety

codes;
needs
major
repairs;
and
is
not
on
county
property.
Replacement
would
be
built
on
county
land
and

centralize
opera3ons 










5,000,000
 15
Hawaii
County HI Streets/Roads Construct
the
1,400‐foot
Laaloa
Avenue
extension
from
Kuakini
Highway
to
create
a
new
mountain‐to‐ocean

connector
road
and
add
a
new
signalized
intersec3on
to
improve
traffic
circula3on
in
the
area.

 








17,000,000
 20
Hawaii
County HI Streets/Roads Hina
Lani
Resurfacing;
resurface
5
miles
of
highly
deteriorated
urban
street 










6,000,000
 20
Hawaii
County HI Streets/Roads Kaiminani
Drive
resurfacing;
resurface
6
miles
of
highly
deteriorated
highway
and
construct
10
new
drywells 










6,000,000
 20
Hawaii
County HI Streets/Roads Palani
Road/Kamakaeaha

Avenue
Intersec3on
Improvements
including
addi3on
of
leb
turning
lane
to
increase

intersec3on
capacity
and
reduce
conges3on
 










5,000,000
 20
Hawaii
County HI Streets/Roads Puna
Makai
Alternate
Road
EIS
for
a
high‐priority
new
road
necessary
to
meet
the
transporta3on
needs
of
a

region
expected
to
double
in
popula3on
to
70,000
by
2030
 










2,000,000
 24
Hawaii
County HI Streets/Roads Lindsey
Road
Bridge
replacement
to
increase
carrying
capacity
of
bridge
in
Waimea
to
meet
current
standards
 










9,000,000
 26
Hawaii
County HI Streets/Roads Mamalahoa
Widening
from
North
Hawaii
Community
Hospital
to
MP56
to
increase
traffic
capacity
through
the

Kamamalu
Intersec3on
and
reduce
conges3on 








10,000,000
 30
Hawaii
County HI Streets/Roads Construct
Kamanu
Street
Extension
to
connect
Hina
Lani
Street
to
Kealakehe
Parkway
to
reduce
traffic

conges3on
in
West
Hawaii
 








15,000,000
 45
Hawaii
County HI Streets/Roads Saddle
Road
resurfacing
and
reconstruc3on
of
13
miles
of
highly
deteriorated
road
from
MP
43
to
MP
56
 








15,000,000
 54
Hawaii
County HI Streets/Roads Construct
two‐lane
Ane
Keohokalole
(Mid‐Level)
highway
linking
Palani
Road
and
Kealakehe,
relieving

conges3on
on
surrounding
roadways
and
opening
300
acres
of
state
land
up
for
development
of
affordable

housing.
 








15,000,000
 125
Hawaii
County HI Streets/Roads Construct
Alii
Parkway,
a
4.5‐mile
two‐lane
highway
to
reduce
vehicular
conges3on
on
Alii
Drive,
Kuakini

Highway
and
por3ons
of
Queen
Kaahumanu
Highway 








15,000,000
 133
Hawaii
County HI Transit Bus
Stop
and
Shelter
project
to
construct
50
covered
bus
shelters
to
protect
bus
riders
from
the
elements
and

encourage
public
transit
use 










1,200,000
 40
Hawaii
County HI Transit Mass
transit
base
yard
construc3on
to
include
administra3ve
building
to
serve
the
public
and
house
staff,

maintenance
facility
for
vehicle
repairs,
bus
wash
bay
and
refueling
sta3on 








10,000,000
 50
Hawaii
County HI Transit Vehicle
enhancement
project,
purchase
of
30‐45
passenger
buses
and
25‐30
passenger
buses
to
expand

transporta3on
services,
providing
easier
access
for
the
public
to
health
care,
educa3onal
ins3tu3ons,
youth

ac3vi3es
and
work
sites 








17,000,000
 75
Hawaii
County HI Water Backflow
Preven3on
Compliance
to
install
water
system
backflow
preven3on
assemblies
on
67
county
Public

Works
facili3es
to
comply
with
Department
of
Water
Supply
rules 










1,000,000
 6
Hawaii
County HI Water Memorial
Hospital
large
capacity
cesspool
replacement,
including
installa3on
of
pump
and
connec3on
to

municipal
sewer 










1,000,000
 7
Hawaii
County HI Water Backflow
Preven3on
Compliance,
county
Parks,
to
comply
with
state
and
county
requirements
for
safety
of

public
drinking
water 










2,000,000
 12
Hawaii
County HI Water Repair
of
the
unlined
Keopu
Channel
damaged
in
the
2007
earthquake
and
flood.
TIMETABLE:
Approx.
3,500

man
day
during
a
nine‐month
period. 










5,000,000
 20
Hawaii
County HI Water Haao
Springs
drainage
channel
repair
and
improvements
include
repairing
damaged
concrete
lining
and

enforcing
the
channel
slopes,
providing
concrete
lining
between
culvert
and
exis3ng
concrete
lining
and

providing
concrete
wing
walls
at
culvert
inlet 










4,000,000
 24
Hawaii
County HI Water Kealakehe
Wastewater
Treatment
Plant
sludge
removal,
clearing
lagoon
treatment
system
is
needed
to
restore

plant
to
original
design
capacity
of
5.1
MGD
and
to
accommodate
increased
waste
from
local
sep3c
tanks
 










4,000,000
 30
Hawaii
County HI Water Papaikou
and
Kulaimano
Dewatering,
installa3on
of
iden3cal
and
updated
sludge
dewatering
systems
at

wastewater
treatment
plants
 










1,600,000
 30
Hawaii
County HI Water Pua
Sewage
Pump
Sta3on
replacement
of
aging
wastewater
pumps,
control
and
monitoring
systems.
Failure
of

the
sta3on
could
result
in
a
sewage
spill
of
3
million
gallons
per
day. 










1,800,000
 30
Hawaii
County HI Water Waimea
Water
System
improvements;
install
5,900
feet
of
12‐inch
water
line
from
Spencer
Road
to
Opelo

Road
to

provide
transmission
capacity
in
an
area
that
regularly
experiences
low‐pressure
condi3ons. 










1,100,000
 40
Hawaii
County HI Water Install
16‐inch
water
main
in
conjunc3on
with
state
widening
project
of
the
Queen
Kaahumanu
Highway;

includes
installa3on
of
25,000
linear
feet
of
line
from
Kealakehe
Parkway
to
Keahole
Reservoir.
 










3,750,000
 50
Hawaii
County HI Water Kalanianaole
Avenue
Sewer
Rehabilita3on,
Phase
2,
repairs
and
upgrade
of
interceptor
that
serves
much
of
the

Hilo
area.
Failure
of
the
interceptor
would
cause
of
spill
of
about
2.5
MG
per
day 










8,000,000
 50
Hawaii
County HI Water Kealakehe
Wastewater
Aera3on
upgrade
to
allow
plant
to
accommodate
sewage
from
local
sep3c
tanks;
EPA

has
required
sep3c
tanks
to
replace
cesspools,
adding
to
the
waste
delivered
to
the
plant

 










6,000,000
 50
Hawaii
County HI Water Komohana
Heights
Large
Capacity
Cesspool
replacement;
connec3on
to
sewer
syatem
will
reduce
bacterial

levels
within
Hilo
Bay
and
other
parts
of
the
East
Hawaii
shoreline 










4,000,000
 50
Hawaii
County HI Water Honokaa
Large
Capacity
Cesspool
replacement;
per
EPA
mandate,
replace
cesspool
system
serving
numerous

public
facili3es
including
Honokaa
Public
School
complex,
state
library,
Health
Department,
Judiciary
and

elderly
housing 








17,500,000
 200
Hawaii
County HI Water Palani
Road
transmission
waterline;
construct
two
concrete
reservoirs
and
12,500
feet
of
waterline
south
of

Palani
Road
to
the
Liliuokalani
subdivision.
 








14,000,000
 200
Hawaii
County HI Water Naalehu
and
Pahala
Large
Capacity
Cesspool
Replacement
,
replace
wastewater
system
serving
Kau
public

schools,
business
districts
and
residences.

 








26,350,000
 250
Hawaii
County HI Water North
Kona
Sewer
and
Reuse,
installa3on
of
resuse
infrastructure
at
the
Queen
Kaahumanu
Highway
in

conjunc3on
with
the
state
highway
widening
project.
Will
serve
planned
development
in
the
area
and

conserve
limited
potable
water
supplies. 








20,050,000
 250
Hawaii
County HI Water Queen
Liliuokalani
Large
Capacity
Cesspool
replacement,
closing
cesspool
and
connec3ng
to
Kealakehe

Wastewater
treatment
plant
to
comply
with
EPA
mandate,
closure
deadline
6/1/10 








18,500,000
 250
Honolulu HI CDBG Purchase
and
install
five
UV
disinfec3on
systems
at
Aqua3cs
Complex 












150,000
 3
Honolulu HI CDBG Kahuku
Housing
Founda3on
Kahuku
Elderly
‐
Renova3on
of
61
exis3ng
affordable
rental
units
in
Kahuku. 










1,000,000
 8
City State Program Project
Descrip3on Funding
Required Jobs
Honolulu HI CDBG Curb/gufer/sidewalk
improvements
in
low‐moderate
income
neighborhoods 












750,000
 20
Honolulu HI CDBG Habitat
Leeward
Waianae
Project
‐
31
new
Self
Help
Units
for
homeownership. 










4,850,000
 26
Honolulu HI CDBG Self
Help
Housing
Corpora3on
of
Hawaii
Maili
Project
‐
38
new
Self
Help
Units
for
homeownership. 










3,500,000
 46
Honolulu HI CDBG Catholic
Chari3es
Hawaii
Renova3on
of
Public
Service
Facility
‐
Renova3on
of
a
public
service
facility
to
house

programs
serving
low‐moderate
income
families. 








10,000,000
 60
Honolulu HI CDBG Housing
Solu3ons
Inc.
Seawinds
Apartments
‐
50
new
affordable
rental
units
in
Waianae. 










2,200,000
 92
Honolulu HI CDBG Pacific
Housing
Assistance
Corpora3on
Villas
at
Maluohai
‐
72
new
affordable
rental
housing
units
in
Kapolei. 








26,000,000
 150
Honolulu HI CDBG Hawaii
Housing
Development
Corpora3on
Hale
Mohalu
‐
164
new
affordable
rental
housing
units. 








40,837,591
 184
Honolulu HI CDBG Hui
Kauhale,
Inc.
(EV
Area
H)
‐
192
new
affordable
rental
housing
units
in
Ewa. 








12,390,000
 220
Honolulu HI CDBG Hawaii
Housing
Development
Corpora3on
Hale
Wai
Vista
I
&
II
‐
216
new
affordable
rental
housing
units
in

Waianae. 








61,030,061
 366
Honolulu HI CDBG Mutual
Housing
Assn
of
Hawaii
Ko'Oloa'Ula
‐
308
affordable
rental
housing
units
in
Kapolei 








80,750,000
 368
Honolulu HI CDBG St.
Francis
Development
Corpora3on
Franciscan
Vistas
Ewa
‐
292
(149
elderly
and
143
affordable)
rental
units

in
Ewa. 








96,900,000
 450
Honolulu HI Energy Solid
Waste
to
Energy
Facility
‐
Design
Expansion 










7,000,000
 35
Honolulu HI Energy Solid
Waste
to
Energy
Facility
‐
Pollu3on
Control
Improvements 








60,000,000
 100
Honolulu HI Public
Safety Applicant
Tracking
System:
On‐line
applicant
tracking
system
to
process
job
applicants
more
efficiently
and

effec3vely. 














50,000
 0
Honolulu HI Public
Safety Community
Policing
Resource
Center:
Provide
funds
for
eight
work
sta3ons.
No
jobs
created 














28,000
 0
Honolulu HI Public
Safety Metropolitan
Police
Recruit
Training
Posi3ons:
Provide
funding
for
100
MPR
training
posi3ons
to
enable
the

HPD
to
hire
addi3onal
recruits. 










5,000,000
 0
Honolulu HI Public
Safety Scien3fic
Inves3ga3on
Sec3on
Forensic
Lab
Expansion:
Provide
needed
equipment
for
the
lab
expansion.
 












265,000
 0
Honolulu HI Public
Safety Scien3fic
Inves3ga3on
Sec3on
Training:
Provide
training
for
personnel
for
required
cer3fica3ons. 














90,000
 0
Honolulu HI Public
Safety Generator
Improvements
at
Various
Police
Facili3es 












180,000
 1
Honolulu HI Public
Safety Honolulu
Police
Department
Headquarters
‐
Correct
building
deficiencies. 












100,000
 1
Honolulu HI Public
Safety Kapolei
Fire
Sta3on
Emergency
Roof
Repair
‐
Remove
exisi3ng
roof
(2,100
SF)
and
install
3‐ply,
modified

bitumen
roofing
and
new
copper
flashing. 














25,000
 1
Honolulu HI Public
Safety Miscellaneous
Fire
Sta3on
Repairs
at
Makiki,
Manoa
and
Makakilo
Fire
Sta3ons. 














95,000
 1
Honolulu HI Public
Safety Mokulele
Fire
Sta3on
Repairs
‐
Hazmat
abatement,
interior
improvements,
A/C
system
improvements. 












190,000
 1
Honolulu HI Public
Safety Digital
Evidence
Management
System:
Management
of
digital
audio,
photo,
and
video
evidence
is
a
core

func3on
of
contemporary
law
enforcement.
This
includes
preserving
evidence,
managing
chain
of
custody,

managing
a
searchable
database,
etc. 










4,000,000
 2
Honolulu HI Public
Safety Electronic
Cita3on
System:
System
would
provide
enhanced
traffic
safety;
more
efficient
cita3on
process;

automate
checks
for
warrants,
penal
summons,
protec3ve
orders;
efficient
data
transfer
to
judiciary;
3mely

informa3on
for
inves3gators,
etc. 










5,000,000
 2
Honolulu HI Public
Safety Enterprise
Back‐Up
System,
Disaster
Recovery
and
Con3nuity
of
Government:
Establish
an
enterprise
system

for
the
City
and
the
Honolulu
Police
Department
including
back‐up,
disaster
recovery
and
con3nuity
of

governement.
 










4,000,000
 2
Honolulu HI Public
Safety Fire
Sta3on
Pavement
Improvements
at
Kahaluu,
Kaneohe,
and
Waianae. 












360,000
 2
Honolulu HI Public
Safety In‐Car
Video
System:
An
in‐car
video
system
for
city‐owned
patrol
sedans
would
provide
heightened
safety
for

police
and
prisoners,
reduce
risk
exposure
to
complaints
and
civil
suits.
 








13,000,000
 2
Honolulu HI Public
Safety Honolulu
Police
Department
Training
Facility
improvements
including
reconstruc3on
of
the
gymnasium
roof. 












530,000
 3
Honolulu HI Public
Safety Computer
Forensics
laboratory:
Establish
a
full‐featured
computer
forensics
laboratory
to
support
all
manner

of
digital
evidence
recovery
and
analysis.
 








25,000,000
 4
Honolulu HI Public
Safety Kahuku
Fire
Sta3on
Improvements
‐Hazmat
abatement,
roof,
window
and
door
replacement
and
A/C
system

improvements. 












785,000
 4
Honolulu HI Public
Safety Kahuku
Police
Sta3on
Interior
Improvements
‐
Upgrade
juvenile
deten3on
and
booking
area,
receiving
area,

arsenal
storage,
lobby
and
new
conference
room. 












800,000
 4
Honolulu HI Public
Safety Police
Services
Officer:
Program
to
provide
interim
employment
for
people
interested
in
a
law
enforcement

career.
 












350,000
 10
Honolulu HI Public
Safety EMS
Headquarters
and
Communica3ons
Facility,
Young
Street
‐
Plan
and
design
facility
for
two
ambulance

units
and
district
chief. 










2,200,000
 11
Honolulu HI Public
Safety Metropolitan
Police
Recruit
Staffing
Func3ons:
Honolulu
Police
Department
Human
Resources
Division
to

assume
the
civil
service
tes3ng
responsibli3es. 










1,000,000
 15
Honolulu HI Public
Safety East
Kapolei
Regional
Fire
Sta3on
and
Warehouse
‐
Design
facility 










1,000,000
 30
Honolulu HI Public
Safety Upgrade
Honolulu
First
Responder
Radio
System
to
700MHz 










5,000,000
 37
Honolulu HI Public
Safety Harden
Honolulu
Government
Facili3es
‐
Expansion
of
Access
Controls
and
Monitoring
Systems 










5,000,000
 50
Honolulu HI Public
Safety Broadband
Expansion
Hawaii 










5,000,000
 100
Honolulu HI Public
Safety Upgrade
State
Drivers
Licensing
and
Motor
Vehicle
Registra3on
Systems
to
support
Real‐ID 








10,000,000
 100
Honolulu HI Public
Safety Repair/Rebuild
First
Responder
Communica3ons
Facili3es 








20,000,000
 200
Honolulu HI Public
Safety Develop
311
Call
Center
for
delivery
of
Ci3zen
Centric
Services 










5,000,000
 250
Honolulu HI Streets/Roads Iolani
Avenue
Retaining
Wall
‐
Replace
deteriora3ng
wall
with
new
CRM
wall. 












900,000
 5
Honolulu HI Streets/Roads Street
Ligh3ng
Improvements 










2,000,000
 10
Honolulu HI Streets/Roads Curb
Ramps
on
City
Streets 










2,500,000
 12
Honolulu HI Streets/Roads Road
Improvements,
Pearl
City 










3,200,000
 16
Honolulu HI Streets/Roads CIPP
Lining
of
Storm
Drains
(2009) 












500,000
 20
Honolulu HI Streets/Roads CIPP
Lining
of
Storm
Drains
(2010) 












500,000
 20
Honolulu HI Streets/Roads Kamokila
Boulevard
Extension 










1,900,000
 23
Honolulu HI Streets/Roads Joint
Traffic
Management
Center
Site
Prepara3on 










2,000,000
 24
Honolulu HI Streets/Roads Traffic
Safety
Improvements‐Various
Loca3ons 










2,000,000
 24
Honolulu HI Streets/Roads Traffic
Signals
Various‐Phase
XI 










2,000,000
 24
Honolulu HI Streets/Roads Computerized
Traffic
Control
System
‐
Phase
X 










2,400,000
 29
Honolulu HI Streets/Roads Rehabilita3on
of
Concrete
Sidewalks
(2009) 










1,000,000
 30
Honolulu HI Streets/Roads Rehabilita3on
of
Concrete
Sidewalks
(2010) 










1,000,000
 30
Honolulu HI Streets/Roads Traffic
Count/Speed
Sta3ons
for
Conges3on
Management 










2,500,000
 30
Honolulu HI Streets/Roads Traffic
Improvements‐Harding
Avenue
&
Dillingham
Blvd 










2,600,000
 31
City State Program Project
Descrip3on Funding
Required Jobs
Honolulu HI Streets/Roads Traffic
Signals
Various‐Phase
X 










4,000,000
 48
Honolulu HI Streets/Roads Rehabilita3on
of
Localized
Streets
(2009) 








10,000,000
 50
Honolulu HI Streets/Roads Rehabilita3on
of
Localized
Streets
(2010) 








10,000,000
 50
Honolulu HI Streets/Roads Rehabilita3on/Reconstruc3on
of
Streets,
Various
Loca3ons 








10,000,000
 50
Honolulu HI Streets/Roads Waipio
Point
Access
Road
Improvements 










5,500,000
 66
Honolulu HI Streets/Roads Traffic
Signal
Maintenance
Facility 










5,820,000
 70
Honolulu HI Streets/Roads Rehabilita3on
of
Secondary
Roads
(2009) 








20,000,000
 100
Honolulu HI Streets/Roads Rehabilita3on
of
Secondary
Roads
(2010) 








20,000,000
 100
Honolulu HI Streets/Roads Kalaeloa
Boulevard,
Phase
2
Widening
and
Reconstruc3on
(OR&L
R/W
to
Malakole
Street) 








30,000,000
 200
Honolulu HI Streets/Roads Makakilo
Extension 








70,000,000
 840
Honolulu HI Transit ADA
Transit
Access
Improvements 










2,000,000
 24
Honolulu HI Transit Bus
Stop
Pad
Improvements 










2,000,000
 24
Honolulu HI Transit Pearl
City
Bus
Facility
‐
Bus
parking
expansion 










6,000,000
 30
Honolulu HI Transit Procure
New
Intra‐Oahu
Ferry
Boat 










3,000,000
 36
Honolulu HI Transit Design
and
Construct
Improvements
to
the
Alapai
Express
Bus
Terminal 










6,000,000
 72
Honolulu HI Transit Expand
Pearl
City
Bus
Facility 










6,000,000
 72
Honolulu HI Transit Wahiawa
Transit
Center 










8,000,000
 96
Honolulu HI Transit Kalihi
Palama
Bus
Facility
Improvements
‐
replace
wash
rack
and
oil
water
separator,
repave
bus
parking
area,

design,
construct,
and
equip
add3onal
ar3culated
bus
bays. 










9,000,000
 108
Honolulu HI Transit Construct
the
Middle
Street
Intermodal
Center,
plazorm
and
intersec3on
improvements 








22,000,000
 264
Honolulu HI Transit Middle
Street
Intermodal
Center
Parking
Garage 








30,000,000
 360
Honolulu HI Transit Upgrade
Bus
Communica3on
System
to
Digital 








30,000,000
 360
Honolulu HI Transit Honolulu
High
Capacity
Transit
Maintenance/Service
Facility 








45,000,000
 540
Honolulu HI Transit Procure
Hybrid
Buses
&
Paratransit
Vehicles‐30
Hybrid
60',
20
Hybrid
40',
30
Paratransit
Vehicles 








45,000,000
 540
Honolulu HI Transit Honolulu
High
Capacity
Transit
Guideway‐Phase
1 






202,000,000
 2424
Honolulu HI Water Bella
Vista
180
Reservoir
Renova3on 












750,000
 1
Honolulu HI Water Kahana
315
Reservoir
Repair 












600,000
 1
Honolulu HI Water Kalihi
Corpora3on
Yard
Vehicle
Wash
Area
Improvements 












350,000
 1
Honolulu HI Water Kealakaha
Drive,
Pooholua
Drive
and
Waipao
Place
8‐Inch
Mains 










1,100,000
 1
Honolulu HI Water King
Street
12‐Inch
Main 












250,000
 1
Honolulu HI Water Kuliouou
Line
Booster
Improvements 










1,750,000
 1
Honolulu HI Water Moanalua
405
Reservoir
No.
1
Repair 












750,000
 1
Honolulu HI Water University
Avenue
12‐Inch
Main,
Part
II 














75,000
 1
Honolulu HI Water Kaluanui
Wells
Renova3on 










2,500,000
 2
Honolulu HI Water Kamehameha
Highway
8‐Inch
Mains
(Kaneohe) 










2,000,000
 2
Honolulu HI Water Kapahulu
Water
System
Improvements,
Part
III 










2,500,000
 2
Honolulu HI Water Maunaolu
530
Open
Reservoir
Drainage
System
Improvements 












225,000
 2
Honolulu HI Water Pacific
Heights
Water
System
Improvements,
Part
I 










2,200,000
 2
Honolulu HI Water Palolo
405
and
Palolo
605
Reservoirs
Renova3on 










1,400,000
 2
Honolulu HI Water Piikoi
Street
Drainline
Reconnec3on 












170,000
 2
Honolulu HI Water Pohakupu
272
Reservoir
No.
1
Renova3on 










2,000,000
 2
Honolulu HI Water Repair
of
Waimanalo
230
and
Waimanalo
364
Reservoirs 










1,200,000
 2
Honolulu HI Water Waimalu
Wells
I
Erosion
Control
and
Drainage
Improvements 










1,700,000
 2
Honolulu HI Water Ward
Avenue
12‐Inch
and
8‐Inch
Water
Mains 










2,000,000
 2
Honolulu HI Water Kamehameha
Highway
8‐Inch
Mains
(Haleiwa) 










3,200,000
 3
Honolulu HI Water Waahila
405
Reservoir
Renova3on 










2,500,000
 3
Honolulu HI Water Fort
DeRussy
Wastewater
Pump
Sta3on 












350,000
 4
Honolulu HI Water Lualualei
Wastewater
Pump
Sta3on
Force
Main
‐
Design
Phase 










1,000,000
 5
Honolulu HI Water Waialae
Iki
Unit
III
Sewer
Rehab 










1,050,000
 8
Honolulu HI Water Ala
Moana
WWPS
Force
Main
Modifica3on
‐
FM
No.1
Rehab 












700,000
 10
Honolulu HI Water Kailua
WWTP

‐
Secondary
Clarifier
Refurbishment 












600,000
 10
Honolulu HI Water Kailua
WWTP
‐
Dewatering
Building
Centrifuge
Installa3on 












500,000
 10
Honolulu HI Water Aliamanu
WWPS
No.
1
&
2
Upgrade
and
Relief
Sewer 










1,300,000
 15
Honolulu HI Water Amelia
Street
Sewer
Relief/Rehabilita3on 










2,320,000
 15
Honolulu HI Water Central
Oahu
Wastewater
Facili3es
and
Effluent
Reuse
‐
Design 










3,000,000
 15
Honolulu HI Water Enchanted
Lake
WWPS
Upgrade 










2,700,000
 15
Honolulu HI Water Gravity
Sewer
Tunnel
Projects,
Sand
island
&
Kailua
‐
Design
Defini3on 










3,000,000
 15
Honolulu HI Water Hanawai
Circle
Sewer
Rehabilita3on 










1,400,000
 15
Honolulu HI Water Kalihi
Valley
Reconstructed
Sewer 










3,060,000
 15
Honolulu HI Water Kuliouou
Sewer
Rehabilita3on
&
WWPS
Modifica3on
‐
WWPS
Modifica3on 










2,810,000
 15
Honolulu HI Water Mililani
Wastewater
Pre‐Treatment
Facility
Headworks
Upgrade 










2,900,000
 15
Honolulu HI Water Rose
Street/Kam
IV
Road
and
Richard
Lane/Linapuni
Street
Sewer
Rehabilita3on 










1,850,000
 15
Honolulu HI Water Sewer
Manhole
And
Pipe
Rehabilita3on
At
Various
Loca3ons 










2,200,000
 15
Honolulu HI Water Sewer
Rehabilia3on
Projects
on
Oahu 








15,000,000
 15
Honolulu HI Water Waimanalo
Sewer
Rehabilita3on
 










2,900,000
 15
Honolulu HI Water Kahanu
St,
School
St,
and
Umi
St
Sewers
Relief/Rehabilita3on 










3,800,000
 18
Honolulu HI Water Kalakaua
Ave
Sewer
Rehabilita3on 










4,000,000
 18
Honolulu HI Water Ala
Moana
Blvd
Sewer
Reconstruc3on 










8,000,000
 20
Honolulu HI Water Houghtailing
Street
Area
Sewer
Rehab 








10,000,000
 20
Honolulu HI Water Kailua
WWTP
Improvements 








10,000,000
 20
Honolulu HI Water Kailua/Kaneohe
Sewer
Manhole
and
Pipe
Rehabilita3on 










5,400,000
 20
Honolulu HI Water Kailua/Kaneohe
Sewer
Rehabilita3on
‐
Ph
1 










6,350,000
 20
Honolulu HI Water Kailua/Kaneohe
Sewer
Rehabilita3on
‐
Ph
2 










7,000,000
 20
Honolulu HI Water Kalaheo
Ave/
Mokapu
Road/
Aikahi
Loop
Sewer
Rehab 










6,460,000
 20
Honolulu HI Water Kaneohe
Bay
Drive
Trunk
Sewer
Reconstruc3on 










8,000,000
 20
Honolulu HI Water Kapiolani
Area
Revised
Sewer
System 








11,700,000
 20
Honolulu HI Water Wahiawa
WWTP
Influent
Pump
Sta3on
and
Equaliza3on
Facility 










6,500,000
 20
Honolulu HI Water Wilhelmina
Rise
Sewer
Rehabilita3on 








16,900,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Honolulu HI Water Honouliuli
WWTP
Solids
Handling
&
Energy
Recovery
Project 








15,000,000
 30
Honolulu HI Water Kalanianaole
Highway
Sewer
System
Improvements 








17,000,000
 30
Honolulu HI Water Sewer
Condi3on
Assessment
Program;
includes
CCTV
Inspec3on
of
Sewerlines,
Assessment
and
Planning
Work











6,000,000
 30
Honolulu HI Water Central
Oahu
Wastewater
Facili3es
and
Effluent
Reuse 








25,000,000
 40
Honolulu HI Water Kalihi/Nuuanu
Area
Sewer
Rehabilita3on
 








33,000,000
 40
Honolulu HI Water Waimalu
Sewer
Rehabilita3on
Ph
I 








45,100,000
 45
Kauai
County HI CDBG CDBG
Program
Expansion,
Including
Programs
for
First‐Time
Homeowners 












600,000

Kauai
County HI CDBG Government
Efficiency
‐
Automated
Human
Resource
System
Acquisi3on
and
Implementa3on 












500,000

Kauai
County HI CDBG Historic
County
Building
Restora3on
and
Renova3on 










5,000,000

Kauai
County HI CDBG Islandwide
Playground
and
Recrea3onal
Facility
Improvements 










2,000,000

Kauai
County HI CDBG Jobs
Programs
‐
Employer
Outreach
and
Labor
Pool
Expansion 












805,000

Kauai
County HI CDBG Kekaha
Landfill
Lateral
Expansion 










9,000,000

Kauai
County HI CDBG Parks
ADA
Access
Barrier
Removal 










2,200,000

Kauai
County HI CDBG Wailua
Golf
Course
Maintenance
Building
Reconstruc3on 










3,000,000

Kauai
County HI Energy Outdoor
Sports
Ligh3ng
Conversion
for
Energy
Efficiency
and
Shielding 










2,000,000

Kauai
County HI Energy Revolving
Energy
Loan
Fund
for
Small
Business 










5,000,000

Kauai
County HI Housing Affordable
Housing
Site
Acquisi3on
and
Infrastructure
Development 








26,909,000

Kauai
County HI Public
Safety New
Kealia
Fire
Sta3on 










5,000,000

Kauai
County HI Streets/Roads Aliomanu
Emergency
Road
Repair 










2,500,000

Kauai
County HI Streets/Roads Emergency
Reinforcement
of
Opaekaa
Bridge
and
Puuopae
Bridge 












660,000

Kauai
County HI Streets/Roads Islandwide
County
Road
Resurfacing
Projects 










2,000,000

Kauai
County HI Streets/Roads Levee
Projects
‐
Emergency
I‐Wall
Repair
and
Levee
Cer3fica3ons 










1,200,000

Kauai
County HI Streets/Roads Lydgate‐Kapaa
Bike
Path
and
Associated
Facility
(Kamalani
Pavilion)
Repair 










3,800,000

Kauai
County HI Transit Bus
Fleet
Expansion 










3,000,000

Kauai
County HI Transit Bus
Fleet
Replacements 










1,000,000

Kauai
County HI Water Kaehulua
&
Apopo
Roads
Water
Main
Replacement,
Phase
II 










3,000,000

Kauai
County HI Water Kilauea
School
12‐inch
Waterline
Extension
for
Fire
Protec3on 












700,000

Kauai
County HI Water Lihue
Town
Water
Main
Replacement 










3,500,000

Kauai
County HI Water Waimea
Canyon
Drive
Waterline
Replacement 










3,000,000

Kauai
County HI Water Waimea
Town
Water
Main
Replacement 










2,500,000

Kauai
County HI Water Waimea
Wastewater
Treatment
Plant
Expansion 








12,000,000

Kauai
County HI Water Wastewater
Laboratory
Renova3on 










1,000,000

Kauai
County HI Water Watershed
Protec3on
‐
Habitat
Protec3on 












510,000

Maui HI CDBG Molokai
Fire
Rescue
Boat 












222,600
 15
Maui HI CDBG D6
Dozer
with
Truck
and
Trailer 












600,000
 20
Maui HI CDBG Hoolehua
Fire
Sta3on 










5,000,000
 25
Maui HI CDBG Lanai
Fire
Sta3on 










4,000,000
 25
Maui HI CDBG Hoolehua
Mini‐Pumper 












200,000
 30
Maui HI CDBG Hoolehua
Tanker
Apparatus 












600,000
 30
Maui HI CDBG Kaunakakai
Fire
Sta3on
Site
Work
and
Waterline 










4,000,000
 30
Maui HI CDBG Kaunakakai
Pumper
Apparatus 












702,605
 30
Maui HI CDBG Renova3on
of
Kaunoa
Senior
Center 












415,000
 37
Maui HI CDBG Haiku
Fire
Sta3on
‐
Waterline 










3,000,000
 40
Maui HI CDBG Malama
Family
Recovery
Center
Improvement
Project
(Demoli3on
and
Construc3on) 












500,000
 45
Maui HI CDBG Construc3on
of
Lanai
Senior
Center 












850,000
 50
Maui HI CDBG Haiku
Fire
Sta3on 










5,500,000
 200
Maui HI Energy CML
Wind
and
Solar
Energy
Genera3on
(Purchase/Install
Equipment/Connect
Electrical) 












300,000
 5
Maui HI Energy Hana
Landfill
Solar
Energy
(Purchase/Install
Photovoltaic/Connect
Electrical) 












250,000
 5
Maui HI Energy Lanai
Electric
Vehicle
Charging
and
Energy
Storage
Infrastructure 










1,470,000
 5
Maui HI Energy Lanai
Landfill
Solar
Energy
(Purchase/Install
Photovoltaic/Connect
Electrical) 












250,000
 5
Maui HI Energy Molokai
Landfill
Solar
Energy
(Purchase/Install
Photovoltaic/Connect
Electrical) 












250,000
 5
Maui HI Energy Advanced
Renewable
Energy
Training
Center
for
Renewable
Energy
Produc3on
Systems,
Distributed

Genera3on,
Energy
Storage,
and
Grid
Integra3on 










5,000,000












2,940,000
 10
Maui HI Energy Molokai
Electric
Vehicle
Charging
and
Energy
Storage
Infrastructure
Solar
Energy
and
Storage
Systems
for
Fire
Sta3ons 










6,000,000
 15
Maui HI Energy Solar
Energy
and
Storage
Systems
for
Police
Sta3ons 










6,000,000
 15
Maui HI Energy Central
Maui
Landfill
3,000
Gallon
Diesel
Tanks
and
Pad 












400,000
 20
Maui HI Energy Central
Maui
Landfill
Gas
Collec3on
System
Expansion,
Phase
IV 










2,000,000
 20
Maui HI Energy Propane
Hea3ng
Replacement
with
Solar
Water
Hea3ng
Systems
for
County
Swimming
Pools 










6,000,000
 20
Maui HI Energy CML
Gas
to
Energy
Project 










4,200,000
 25
Maui HI Energy Solar
Energy
and
Storage
Systems
for
Community
Centers 








12,000,000
 30
Maui HI Energy Solar
and
Wind
Energy
Genera3on
and
Storage
Systems
at
County
Domes3c
Water
Facili3es,
Wastewater

Treatment
Plants
and
Landfill
Sta3ons 








18,000,000
 45
Maui HI Energy Integrated
Million‐Ton
Carbon
Reduc3on,
Watershed
Protec3on,
Soil
Conserva3on
and
Greening
Project











7,500,000
 75
Maui HI Energy Maui
Electric
Vehicle
Charging
and
Energy
Storage
Infrastructure 








25,000,000
 100
Maui HI Energy Energy
Upgrade
and
Retrofits
of
Exis3ng
County‐Wide
Facili3es 










8,000,000
 225
Maui HI Public
Safety Fire
and
Public
Safety
Apparatus 










1,500,000
 0
Maui HI Public
Safety Civil
Defense
Alert
and
No3fica3on
System 












100,000
 6
Maui HI Public
Safety Mobile
Informa3on
Boards 












150,000
 20
Maui HI Public
Safety Kahului
Fire
Sta3on
Extension 










1,500,000
 30
Maui HI Public
Safety Lahaina
Fire
Sta3on
Extension 










1,000,000
 30
Maui HI Public
Safety Lanai
Fire
Sta3on
Extension 










2,000,000
 30
Maui HI Public
Safety Wailea
Fire
Sta3on
Extension 










1,075,000
 30
Maui HI Public
Safety County
P25
Interoperability
Emergency
Communica3on
System 








20,000,000
 125
Maui HI Public
Safety Kihei
Police
Sta3on 








40,000,000
 200
Maui HI Public
Safety Waikapu
Fire
and
Public
Safety
Emergency
Equipment
Warehouse 










6,000,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Maui HI Streets/Roads Haiku
Road
Reconstruc3on 












600,000
 15
Maui HI Streets/Roads Mill
Street
Retaining
Wall 












500,000
 15
Maui HI Streets/Roads Polipoli
Road
Reconstruc3on 










1,600,000
 15
Maui HI Streets/Roads Waikakoi
Bridge
Repairs 










2,000,000
 20
Maui HI Streets/Roads Countywide
Road
Preventa3ve
Maintenance 










2,000,000
 25
Maui HI Streets/Roads Countywide
Road
Resurfacing 










8,000,000
 25
Maui HI Streets/Roads Kaholopo
Bridge
Replacement 










3,000,000
 25
Maui HI Streets/Roads Market
Street
Improvements
Phase
II 










4,000,000
 30
Maui HI Streets/Roads Repair
and
Maintenance
of
Kulanihakoi
Bridge 












100,000
 30
Maui HI Streets/Roads Wailea
Roads
Reconstruc3on 










1,750,000
 30
Maui HI Streets/Roads Molokai
Highways
Baseyard 










8,000,000
 75
Maui HI Transit Papalaua
Bus
Stop 














10,200
 2
Maui HI Transit State
Office
Building
Bus
Stop 














10,000
 2
Maui HI Transit Eddie
Tam
Memorial
Gym
Bus
Stop 














16,250
 4
Maui HI Transit Ohukai
Street
and
South
Kihei
Road
Bus
Stops 














37,500
 8
Maui HI Transit Luana
Gardens
Bus
Stop 














45,000
 10
Maui HI Transit Ka
Hale
A
Ke
Ola
Bus
Stop 














57,900
 12
Maui HI Transit Expanded
Bus
Fleet
Purchase 










5,000,000
 85
Maui HI Transit Kaahumanu
Center
Transit
Center 












716,850
 162
Maui HI Water Central
Maui
Wind
Turbine
Onsite
Energy
Genera3on 












200,000
 10
Maui HI Water Turblex
Blower
Energy
Efficiency
Project 










1,300,000
 10
Maui HI Water Makawao
Waterline
Improvements 










1,100,000
 12
Maui HI Water Waikamoi
Flume
Improvements 










1,500,000
 12
Maui HI Water Wailuku
Waterline
Improvements
‐
Ainaola
Place 










1,134,000
 12
Maui HI Water Mahinahina
WTP
Improvements 












350,000
 15
Maui HI Water County‐Wide
Injec3on
Well
Rehabilita3on 










6,000,000
 20
Maui HI Water Hamoa
to
Koali
(Hana)
Waterline 










8,000,000
 20
Maui HI Water Kamaole
WTF
Improvements
‐
High
Lib
Pumps 










3,000,000
 20
Maui HI Water Kihei
Waterline
(Mokulele
Hwy
to
Ohukai) 










1,000,000
 20
Maui HI Water Maui
Meadows
Booster
Pump
Improvements 










1,500,000
 20
Maui HI Water Olinda
WTF
‐
8.5
Mg
Reservoir
Relining 










1,000,000
 20
Maui HI Water Replacement
of
Return
Ac3vated
Sludge
Header 












300,000
 20
Maui HI Water Replacement
of
Supervisory
Control
and
Data
Acquisi3on
System 












500,000
 20
Maui HI Water Wailuku
Waterline
Improvements
‐
Vineyard
Street 










2,000,000
 20
Maui HI Water Wailuku‐Kahului
WWRF
Concrete
Restora3on 










1,500,000
 20
Maui HI Water Wailuku‐Kahului
WWRF
Mixed
Liquor
Channel
Repair 










1,000,000
 20
Maui HI Water Water
Conserva3on
Retrofit
Program 










1,208,850
 25
Maui HI Water Lahaina
No.
3
Force
Main
Replacement 










7,560,000
 30
Maui HI Water Replacement
of
Underground
Sewer
Laterals 












800,000
 30
Maui HI Water Replacement
of
Underground
Sewer
Main
Trunk
Lines 












800,000
 30
Maui HI Water Construct
Tsunami
Protec3on
for
Exis3ng
Treatment
Plant
Facility 










7,000,000
 35
Maui HI Water Replacement
of
Exis3ng
Underground
Force
Main
(Kaa) 










2,000,000
 35
Maui HI Water Replacement
of
Exis3ng
Underground
Force
Main
(Kaanapali/Hyaf) 










1,750,000
 35
Maui HI Water Expansion
of
North
Kihei
Recycled
Water
Distribu3on
System 










5,000,000
 40
Maui HI Water Rehabilita3on/Replacement
of
Underground
Sewer
Systems 










4,000,000
 50
Maui HI Water Rehabilita3on/Replacement
of
Exis3ng
Pump
Sta3ons 










8,000,000
 55
Maui HI Water Construc3on
of
Recycled
Water
Tank
and
Associated
Distribu3on
Infrastruture 










3,125,000
 60
Davenport IA Streets/Roads Alley
Reconsrtuc3on 










2,900,000
 29
Davenport IA Streets/Roads ADA
Sidewalk
Ramps 










5,200,000
 56
Davenport IA Transit Transit
Garage 










5,100,000
 55
Davenport IA Water Lagoon
Restora3on 












650,000
 7
Davenport IA Water Urban
Waterfront
Floodplain
Management
Demonstra3on
Project 










9,200,000
 99
Davenport IA Water Davenport
Sewer
Projects,
Including
West
Diversion
Tunnel 








56,100,000
 606
Des
Moines IA Airport Access
Control
Field
Equipment
Purchase/Installa3on 












800,080
 10
Des
Moines IA Airport Wetlands
Mi3ga3on 










1,300,000
 25
Des
Moines IA Airport Terminal
Modifica3ons
for
EDS
Deployment 










6,200,000
 30
Des
Moines IA Airport Consolidated
Rental
Car
Service
Facility 










6,000,000
 40
Des
Moines IA Airport Terminal
Concourse
Enhancements 










3,500,000
 40
Des
Moines IA CDBG New
Sidewalks 










1,200,000
 6
Des
Moines IA CDBG Parks
Improvements
to
playgrounds,
basketball
courts,
tennis
courts,
skate
parks
&
shelters 










1,000,000
 6
Des
Moines IA CDBG Recrea3on
Trails 










2,000,000
 6
Des
Moines IA CDBG Franklin
Library
Renova3on
and
Expansion 










6,100,000
 71
Des
Moines IA Energy Retrofit
Parking
Garages
with
LED
ligh3ng
and
Mo3on
Sensors. 










1,000,000
 5
Des
Moines IA Energy Energy
Conserva3on
Program 












100,000
 6
Des
Moines IA Energy Citywide
interconnec3on
of
all
Traffic
Lights. 












500,000
 25
Des
Moines IA Energy Expand
Trail
System
to
provide
alterna3ve
transporta3on
op3ons. 










1,300,000
 25
Des
Moines IA Energy LEED
Cer3fied
Construc3on
of
Fire
Sta3on
1 










8,000,000
 40
Des
Moines IA Energy Grandview
Golf
Course
Clubhouse
built
to
LEED
standards 










1,300,000
 50
Des
Moines IA Public
Safety Communica3ons
Interoperability
Efforts 










1,500,000
 0
Des
Moines IA Public
Safety HLS
Support
Equipment
‐
EOD/WMD/CBRNE 










1,800,000
 0
Des
Moines IA Public
Safety Mobile
Data
System
Enhancements 










1,000,000
 0
Des
Moines IA Public
Safety Automated
Field
Repor3ng
System 












650,000
 1
Des
Moines IA Public
Safety Forensic
DNA
Laboratory 










2,100,000
 3
Des
Moines IA Public
Safety Fugi3ve
Task
Force 










1,200,000
 9
Des
Moines IA Public
Safety HLS
Response
Team 










1,200,000
 9
Des
Moines IA Public
Safety Intelligence
Driven
Street
Crimes
Unit 










1,200,000
 9
Des
Moines IA Public
Safety Narco3cs
Complaint
Response
Team 










1,200,000
 9
Des
Moines IA Schools Installa3on
of
security
cameras
and
electronic
card
keys
on
all
DMPS
buildings 










1,580,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Des
Moines IA Schools Metronet
Shared
Fiber
Op3c
Wide
Network 












215,000
 10
Des
Moines IA Schools Wireless
LAN
in
all
DMPS
school
buildings 










2,370,000
 10
Des
Moines IA Streets/Roads Curb
&
Median
Replacement 












750,000
 20
Des
Moines IA Streets/Roads McKinley
Avenue
Widening
from
South
Union
to
S.E.
5th 










1,400,000
 25
Des
Moines IA Streets/Roads Pleasant
Drive
Bridge
over
Cummins
Creek 












700,000
 25
Des
Moines IA Streets/Roads Riverpoint
West
Street
Improvements,
non‐rise
por3on 










1,500,000
 25
Des
Moines IA Streets/Roads Street
Resurfacing 










2,000,000
 30
Des
Moines IA Water East
Army
Post
Road
Trunk 










1,500,000
 25
Des
Moines IA Water Flow
Monitoring 










6,000,000
 25
Des
Moines IA Water Lining
Sanitary
Trunk
and
Laterals 










3,000,000
 25
Des
Moines IA Water Lifle
Four
Mile
Trunk 










1,500,000
 25
Des
Moines IA Water Lower
Union
Park
Sewer
Separa3on 










5,000,000
 25
Des
Moines IA Water Riverpoint
Trunk
Separa3on 










2,500,000
 25
Des
Moines IA Water Southeast
Ridge
Trunk 










2,000,000
 25
Des
Moines IA Water Southern
Tier
Pump
Sta3on
Improvements 










5,000,000
 25
Des
Moines IA Water Southwest
Area
Diversion
Facility,
Phase
22,
Segment
3 










8,000,000
 25
Des
Moines IA Water Southwest
Area
Diversion
Facility,
Phase
22,
Segment
7 












750,000
 25
Des
Moines IA Water Twelbh
Street
Sewer
Separa3on 










1,000,000
 25
Des
Moines IA Water West
Des
Moines
Ouzall,
Phase
13,
Segment
5 










1,750,000
 25
Des
Moines IA Water West
Des
Moines
Ouzall,
Phase
13,
Segment
6 










6,000,000
 25
Arco ID CDBG Water
and
Temple
Steet
Enhancement
Beau3fica3on 












350,000
 4
Arco ID Streets/Roads Replace
2
Failed
Bridges 












400,000
 4
Arco ID Streets/Roads Construct
a
4
maile
bike
path 












600,000
 6
Arco ID Streets/Roads Construct/Reconstruct
12
miles
of
Sidewatlk 












720,000
 7
Arco ID Streets/Roads Reconstruct
6
miles
of
failed
roadway 










3,600,000
 36
Arimo ID CDBG Street
Light
enhancement 












150,000
 2
Arimo ID Streets/Roads Construct
/Reconstruct
6
mikes
of
sidewalk 












360,000
 4
Arimo ID Streets/Roads Construct
a
4
mile
bike
Path 












600,000
 6
Arimo ID Streets/Roads Reconstruct
3
miles
of
failed
roadway 










1,800,000
 18
Ashton ID CDBG Main
Street
and
9th
street
Enhancement/beau3fica3on 












250,000
 3
Ashton ID Streets/Roads Construct/Recunstruct
6
miles
of
Sidewalk 












360,000
 4
Ashton ID Streets/Roads Construct
a
5
mile
Bike
Path 












750,000
 8
Ashton ID Streets/Roads Reconstruct
3
miles
of
failed
roadway 










1,800,000
 18
Bancrob ID CDBG Main
street
and
canal
street
beau3fica3on 












200,000
 2
Bancrob ID CDBG Main
Street
Bridge
Reconstruc3on 












500,000
 5
Bancrob ID Streets/Roads Construct
Reconstruct
8
miles
of
sidewalk 












480,000
 5
Bancrob ID Streets/Roads Consturct
a
4
mile
Bike
Path 












600,000
 6
Bancrob ID Streets/Roads Reconstruct
3
miles
of
failed
roadway 








18,000,000
 18
Bancrob ID Streets/Roads Reconstruct
4
miles
of
failed
roadway 










2,400,000
 24
Bellevue ID Streets/Roads 4
crosswalk
enhansements 












400,000
 10
Bellevue ID Streets/Roads Broadford
Road
reconstruc3on 










1,500,000
 10
Bellevue ID Streets/Roads Elm
Stree
reconstruc3on 










1,500,000
 12
Bellevue ID Streets/Roads Pine
Street
reconstruc3on 










2,500,000
 14
Bellevue ID Water 3
miles
of
4"
water
line
replacement 










3,500,000
 10
Bellevue ID Water Muldoon
water
line
replacement 










2,800,000
 14
Bellevue ID Water water
meter
for
water
conserva3on 










1,900,000
 25
Blackfoot ID Airport Air
Port 










2,500,000
 50
Blackfoot ID Water Water
Storage 










4,000,000
 80
Bloomington ID CDBG Street
Light
Enhancement
Program 












150,000
 2
Bloomington ID Streets/Roads Construct/
Reconstruct
6
miles
of
sidewalk 












360,000
 4
Bloomington ID Streets/Roads Construct
a
4
mile 












600,000
 6
Bloomington ID Streets/Roads Reconstruct
3
miles
of
failed
roadway 










1,800,000
 18
Boise ID Energy BSU
Geothermal
Loop
Expansion 










3,000,000
 20
Buhl ID Water Water
Storage
Tank 










2,000,000
 10
Buhl ID Water 1
million
gallon
portable
water
storage
tank 










1,500,000
 15
Buhl ID Water Water
Treatment
Plant 










3,000,000
 15
Buhl ID Water Water
Distribu3on
Upgrade 










4,000,000
 20
Buhl ID Water Water
distribu3on
line
upgrades 










2,500,000
 25
Buhl ID Water Culinary
water
treatment
plant
for
arsenic
removal
(5.3
million
gallons
per
day) 










3,000,000
 30
Burley ID CDBG Landscaping
the
medians
of
the
North
Overland
Project. 












108,000
 11
Burley ID CDBG Sidewalk
improvements
to
7
loca3ons
varying
from
580
b
to
3400
b.

Needed
to
improve
"Safe
Routes
to

Schools". 












526,750
 53
Burley ID Streets/Roads 5th
Street
Roadway
Extension
from
WWPT
to
IWTP 












660,000
 8
Burley ID Streets/Roads Piping
the
irriga3on
drain
ditch
on
the
West
Side
for
widening
of
Overland
from
7th
Street
to
Burger
King 












119,000
 12
Burley ID Streets/Roads Walmart
Exit
Roadway
to
North
3rd
Street 












128,000
 13
Burley ID Streets/Roads North
4th
Street
West
Improvements 












146,000
 15
Burley ID Streets/Roads Extend
storm
sewer
on
North
5th
Street
from
Overland
Avenue
to
Miller
Avenue 












197,000
 20
Burley ID Streets/Roads Washington
Avenue
Truck
Route 










2,057,000
 206
Burley ID Water Commercial
Tire
Sewer
Extension 














86,000
 9
Burley ID Water Almo
and
27th
Street
Sanitary
Sewer
Upgrade 












106,000
 11
Burley ID Water Burley
West
Side
Sewer
Lib
Sta3on 












120,000
 12
Burley ID Water Burley
Industrial
Park
Well
Replacement 












231,000
 23
Burley ID Water North
Overland
Water
System
Improvements 












275,000
 28
Burley ID Water Park
Avenue
Sanitary
Sewer
from
16th
to
the
Park
Place
Subdivision 












356,000
 36
Burley ID Water Gravity
Sanitary
Sewer
from
5th
and
Miller
to
Lib
Sta3on
at
7th
and
North
Overland 












410,000
 41
Burley ID Water Washington
Avenue
Sanitary
Sewer
from
120
South
to
170
South 












660,000
 66
Burley ID Water Hiland
Avenue
Sanitary
Sewer
from
22nd
to
the
Sandy
Glen
Subdivision 












858,000
 86
Burley ID Water Dutchman
Water
System 












924,000
 92
City State Program Project
Descrip3on Funding
Required Jobs
Burley ID Water Priority
1
Water
System
Upgrades
from
2004
Master
Plan 










1,400,500
 140
Burley ID Water Burley
WWTP
compliance
with
EPA
for
collec3on,
process,
nutrient
removal,
and
reuse
of
plant
effluent
for

two
treatment
plants. 








15,000,000
 1500
Council ID Energy Council
Central
Biomass
Heat
Facility 










4,000,000
 400
Crouch ID Housing Crouch
Affordable
Housing
Project 










3,200,000
 200
Crouch ID Schools Garden
Valley
School
District
Biomass
Heat
system 










3,000,000
 10
Crouch ID Water Crouch
Central
Water
District 










2,000,000
 50
Crouch ID Water Regional
Wastewater
Treatment
System
for
Crouch
and
Garden
Valley 










3,500,000
 50
Dayton ID CDBG 4900
W
800
North
and
5
mile
Road
Enhancement 












200,000
 2
Dayton ID Streets/Roads Cosntruct/Reconstruct
6
mikes
of
sidewalk 












360,000
 4
Dayton ID Streets/Roads Construct
a
4.5
Mile
bike
Path 












675,000
 7
Dayton ID Streets/Roads Reconstruct
3
miles
of
failed
roadway 










1,800,000
 18
Dayton ID Water Develop
New
Wells 










1,000,000
 5
Dayton ID Water Development
New
Well 












500,000
 5
Dayton ID Water Water
Impovement
Distrubu3on 










5,000,000
 25
Encampment ID Water Wastewater
Collec3on
Improvements 










3,000,000
 15
Firth ID CDBG Center
Street
Lincoln
Street
and
Roosevelt
Enhar 












350,000
 4
Firth ID Streets/Roads Construct/Reconstruct
12
miles
of
Sidewalk 












600,000
 6
Firth ID Streets/Roads Reconstruct
5
miles
of
failed
roadway 










3,000,000
 30
Garden
City ID Water Relocate
Shenandoah
Lib
Sta3on 












320,000
 2
Garden
City ID Water Standby
power
for
water
supply 












386,000
 2
Garden
City ID Water Reconstruct
Duck
Lake
Lib
Sta3on 












600,000
 3
Garden
City ID Water Rehabilitate
Exis3ng
Wells 












736,000
 4
Garden
City ID Water Develop
New
Wells 










1,717,000
 8
Garden
City ID Water Rehabilitate
Ruby
Lib
Sta3on 












480,000
 12
Garden
City ID Water Construct
Water
Stroage
Tank 










2,600,000
 13
Garden
City ID Water Replace
Undersized
Pipe
to
improve
Fire
Flow 










7,475,000
 36
Garden
City ID Water Replace
failed
collec3on
piping 










8,000,000
 40
Garden
City ID Water Construct
Wastewater
Treatment
Plant 








30,000,000
 150
George
Town ID CDBG Street
Ligth
Enhancement
Program 












150,000
 2
George
Town ID Streets/Roads Construct/Reconstruct
12
miles
of
Sidewalk 












360,000
 4
George
Town ID Streets/Roads Construct
a
4
mile
Bike
Path 












600,000
 6
George
Town ID Streets/Roads Reconstruct
3
miles
of
failed
roadway 










1,800,000
 18
Glenns
Ferry ID CDBG Downtown
Economic
Revitaliza3on/Beau3fica3on
of
8
blocks.

Install
new
sidewalk
and
replace
old.

Curb
and

gufer
where
needed.

Street
ligh3ng
for
safety
and
enhancement. 










1,800,000
 180
Glenns
Ferry ID Schools Elementary
Playground
installa3on
of
outdoor
basketball/hard
surface
facili3es. 














55,000
 5
Glenns
Ferry ID Schools Elementary
Playground
installa3on
of
safety
3les
safety
surface
on
4
play
areas. 














55,000
 5
Glenns
Ferry ID Schools Elementary
Playground
purchase
and
installa3on
of
new
playground
equipment
for
both
upper
elementary

and
lower
elementary. 














88,000
 9
Glenns
Ferry ID Schools Elementary
Playground
removal
of
asphalt,
site
work,
and
installa3on
of
irriga3on
system 












100,000
 10
Glenns
Ferry ID Schools Build
two
new
classrooms
on
facility. 












550,000
 55
Glenns
Ferry ID Schools Remodel
Agricultural
Science
and
Technology
and
Industrial
Technology
Facili3es. 










1,100,000
 110
Glenns
Ferry ID Streets/Roads Safe
Routes
to
School/Pathway
network
for
children,
including
railroad
underpass. 












450,000
 45
Glenns
Ferry ID Streets/Roads 4th
Avenue
Bridge
Replacement.

Safety
concern,
sufficiency
ra3ng
32.5. 












850,000
 85
Glenns
Ferry ID Streets/Roads Local
Street
Improvements. 










1,000,000
 100
Glenns
Ferry ID Streets/Roads Madison
Avenue
Replacement
and
Economic
Revitaliza3on. 










1,500,000
 150
Glenns
Ferry ID Water Waterline
replacements
of
old,
deteriorated
pipelines
to
improve
fire
protec3on,
pressures,
and
reliability.


Installa3on
of
fire
hydrants
and
water
meters. 










1,600,000
 160
Glenns
Ferry ID Water Groundwater
conserva3on
and
economic
revitaliza3on
project
expanding
the
irriga3on
system
usage
in
town

in
lieu
of
potable
water. 










2,500,000
 250
Grace ID CDBG Center
Street
Beau3fica3on 












200,000
 2
Grace ID Streets/Roads Center
Street
Bridge
Reconstruct 












250,000
 3
Grace ID Streets/Roads Construct/Reconstruct
8
mikes
of
sidewalk 












480,000
 5
Grace ID Streets/Roads Conatruct
a
4
mile
bike
path 












600,000
 6
Grace ID Streets/Roads Reconstruct
4
miles
of
failed
roadway 










2,400,000
 24
Hansen ID CDBG US‐30
Downtown
Revitaliza3on/Beau3fica3on
of
5
blocks.

Sidewalk,
curb,
gufer,
and
ligh3ng. 










2,800,000
 280
Hansen ID Schools Insula3ng
wall
west
side
of
gym. 














11,000
 2
Hansen ID Schools Update
ligh3ng
in
the
elementary
school. 














15,000
 2
Hansen ID Schools Install
hardwood
floor
elementary
gym. 














28,000
 3
Hansen ID Schools Install
security
system
in
elementary
school. 














12,000
 3
Hansen ID Schools Insula3ng
ceiling
panel
of
gym. 














18,000
 3
Hansen ID Schools Update
technology
overhead
project. 














21,000
 3
Hansen ID Schools Install
gym
floor
in
main
gym. 














38,000
 4
Hansen ID Schools Update
computer
lab
in
elementary
school. 














33,000
 5
Hansen ID Schools Update
hea3ng
system
in
elementary
school. 














27,000
 6
Hansen ID Schools Re‐roof
Elementary
School
with
Steel 














63,000
 7
Hansen ID Streets/Roads Rock
Creek
Road
Mul3‐Use
Path 












250,000
 25
Hansen ID Streets/Roads School
Safety
Crossing 














26,000
 26
Hansen ID Streets/Roads US‐30/Main
Street
Intersec3on
Improvements 












450,000
 45
Hansen ID Streets/Roads US‐30/Rock
Creek
Road
Intersec3on
Safety
Improvements. 












480,000
 48
Hansen ID Streets/Roads Main
Street
Extension
from
Pine
Avenue
to
US‐30. 












560,000
 56
Hansen ID Streets/Roads Rock
Creek
Road
Railroad
Safety
Crossing 












800,000
 80
Hansen ID Streets/Roads Main
Street
Enhancement
for
four
blocks
from
Railroad
Avenue
to
Poplar
Avenue.

Sidewalk
and
drainage

control. 












850,000
 85
Hansen ID Streets/Roads Hansen
Estates
Subdivision
Interior
Road
Reconstruc3on 












980,000
 98
Hansen ID Streets/Roads Main
Street
Improvements
from
US‐30
to
Railroad
Avenue,
including
railroad
safety
crossing. 










1,300,000
 130
Hansen ID Water Wastewater
Collec3on
Rehabilita3on
for
high
priority
areas
throughout
town. 












600,000
 60
City State Program Project
Descrip3on Funding
Required Jobs
Hansen ID Water Wastewater
Collec3on
Replacement
for
Hansen
Estates
subdivision
of
old
deteriora3ng
concrete
pipeline. 












720,000
 72
Hansen ID Water Priority
1
and
2
Water
System
Improvements
per
January
2003
Water
System
Master
Plan.

Fire
protec3on
‐

distribu3on
system
improvements,
new
well
connec3ons,
new
storage
tank,
SCADA
system,
install
water

meters,
and
loop
dead
end
distribu3on
mains. 










3,500,000
 350
Hansen ID Water Wastewater
Treatment
Improvements
per
pending
Wastewater
Facility
Planning
Study.

New
headworks,

aera3on
equipment,
clarifier,
and
disinfec3on.

Out
of
compliance
with
DEQ
discharge
permit. 










6,500,000
 650
Idaho
City ID CDBG Idaho
City
Wastewater
Expansion
to
Warm
Springs
Resort 










1,000,000
 100
Idaho
City ID CDBG Idaho
City
Business
Incubator
and
Park 










5,000,000
 500
Idaho
City ID Energy Idaho
City
Woody
Biomass
Co‐Genera3on
Plant 








30,000,000
 3000
Idaho
City ID Schools Basin
School
District
Biomass
Heat
System 










3,000,000
 300
Idaho
City ID Schools Basin
School
District
Facili3es
Expansion 










3,000,000
 300
Idaho
City ID Streets/Roads Idaho
City
Main
Street
Reconstruc3on 










2,000,000
 200
Idaho
City ID Streets/Roads Idaho
City
Montgomery
Street
Reconstruc3on 










2,000,000
 200
Idaho
City ID Water Idaho
City
Water
System
Improvements 










5,000,000
 500
Idaho
Falls ID Streets/Roads Bridge
at
25th
&
Emerson
over
Gustafson
Lateral
Canal 












100,000
 5
Idaho
Falls ID Streets/Roads Bridge
at
Kinswood
over
Idaho
Canal 












150,000
 5
Idaho
Falls ID Streets/Roads Concrete
Sidewalk
&
Curb/Gufer
Replacement
‐
Citywide 












500,000
 5
Idaho
Falls ID Streets/Roads ADA
Concrete
Sidewalk
Ramp
Replacement
‐
Citywide 












500,000
 6
Idaho
Falls ID Streets/Roads Pedestrian
Pathway
‐

S
Tourist
Park
to
Sunnyside
Road 












400,000
 8
Idaho
Falls ID Streets/Roads 17th
Street
‐
Aus3n
Ave
to
Hif
Rd
(Mill
&
Inlay) 










1,700,000
 12
Idaho
Falls ID Streets/Roads 17th
Street
‐
Holmes
Ave
to
Aus3n
Ave
(Mill
&
Inlay) 










2,000,000
 12
Idaho
Falls ID Streets/Roads 17th
Street
‐
Pancheri
Bridge
to
Holmes
Ave
(Mill
&
Inlay) 










2,200,000
 12
Idaho
Falls ID Streets/Roads Woodruff
Ave
‐
Caribou
St
to
Meppen
Canal
(Pave.
Reconstruct) 












900,000
 14
Idaho
Falls ID Streets/Roads Citywide
Seal
Coat 










1,000,000
 16
Idaho
Falls ID Streets/Roads Hif
Road
Reconstruc3on
‐
Meppen
Canal
to
Mesa
Street 










6,000,000
 20
Idaho
Falls ID Water Security
Upgrades
at
Exis3ng
Well
Sites 












200,000
 5
Idaho
Falls ID Water AB
Sanitary
Sewer
Lib
Sta3on
Upgrade 












500,000
 6
Idaho
Falls ID Water Waste
Water
Treatment
Plant
Parking
Lot
Paving 












200,000
 8
Idaho
Falls ID Water Church
Farm
Storm
Water
Lib
Sta3on
Replacement 












800,000
 10
Idaho
Falls ID Water Emergency
Genera3on
Installa3on
at
2
Exis3ng
Well
Sites 












700,000
 10
Idaho
Falls ID Water Mill
Run
Storm
Water
Lib
Sta3on
Replacement 












200,000
 10
Idaho
Falls ID Water New
Fire
Supply
Wells
(2) 












600,000
 10
Idaho
Falls ID Water St.
Clair
Storm
Water
Lib
Sta3on
Upgrade 












200,000
 10
Idaho
Falls ID Water Water
Line
Rehabilita3on 










2,000,000
 10
Idaho
Falls ID Water Water
Line
Replacement 










2,000,000
 10
Idaho
Falls ID Water Alley
Sanitary
Sewer
Line
Replacement
Between
7th
St
&
8th
St 










1,000,000
 14
Idaho
Falls ID Water S
Trunk
Water
and
Sewer
Line
Installa3on
between
Well
18
and
Holmes
Ave 










1,750,000
 15
Idaho
Falls ID Water Sanitary
Sewer
Line
Rehabilita3on 










2,000,000
 15
Idaho
Falls ID Water Waste
Water
Treatment
Plant
Gravity
Belt
Thickening 










8,000,000
 30
Jerome ID Schools Jerome
High
School
upgrade/expansion
to
facili3es. 










1,500,000
 150
Jerome ID Streets/Roads 200
South
East
from
Lincoln
Avenue
RR
tracks
needs
to
be
rebuilt. 












300,000
 30
Jerome ID Streets/Roads Nez
Perce
Ave
(100
S
East
and
West
of
Lincoln).

Approximately
½
mile
improvement
requires
full
reconstruct

to
accommodate
heavy
trucks 












450,000
 45
Jerome ID Streets/Roads 100
East
Tiger
Drive
and
Main
Hwy25
intersec3on
improvment
(traffic
light
warranted)
as
cri3cal. 












500,000
 50
Jerome ID Streets/Roads 10th
Ave
and
N.
Lincoln
Ave.
Intersec3on
Improvements
(Traffic
Light
Warranted). 












500,000
 50
Jerome ID Streets/Roads 16th
Ave
West
(100
North
from
Lincoln
to
100
West)
and
100
West
to
Main
St.

Approximately
2
miles
of
full

road
reconstruc3on. 










1,500,000
 150
Jerome ID Streets/Roads ITD
widening
of
Hwy
93
from
I
84
to
Hwy
25. 








20,000,000
 2000
Jerome ID Water Upgrade,
replace
and
repair
irriga3on
lines
and
install
pipes
in
place
of
open
ditches. 










1,500,000
 150
Jerome ID Water Upgrade,
replace
and
repair
irriga3on
lines
and
install
pipes
in
place
of
open
ditches. 










2,500,000
 250
Jerome ID Water Upgrade,
replace
and
repair
sewer
conveyance
system. 










2,500,000
 250
Kellog ID Energy Shoshone
County
Woody
Biomass
Cogenera3on
Facility 








30,000,000
 200
Ketchum ID CDBG Ketchum
Wi‐Fi.
Expand
wireless
internet
within
the
City 














36,000
 4
Ketchum ID CDBG Walnut
Ave
Streetscape‐
New
sidewalks
on
west
side
of
Walnut
between
4th
and
5th
Street. 












200,000
 20
Ketchum ID CDBG Ketchum
Reuse
Water
Pipeline‐
New
reuse
waterline
for
irriga3on
of
reclaimed
water. 












500,000
 50
Ketchum ID CDBG Community
Core
Streetscape
Phase
2‐
Infill
sidewalks,
pedestrian
ligh3ng,
and
landscaping. 












750,000
 75
Ketchum ID CDBG Community
Core
Streetscape
Phase
3‐
Infill
sidewalks,
pedestrian
ligh3ng,
and
landscaping. 












750,000
 75
Ketchum ID CDBG Community
Core
Streetscape
Phase
I‐
Infill
sidewalks,
pedes3an
ligh3ng,
and
landscaping. 












750,000
 75
Ketchum ID CDBG New
Well
Near
Griffen
Bufe
Rural
Fire
Sta3on‐
New
well
to
add
redundancy
to
the
water
system. 










1,000,000
 100
Ketchum ID CDBG Ketchum
4th
Street
Phase
III‐
Downtown
Revitaliza3on
of
3
blocks
including
sidewalks,
Roadway,
Ligh3ng
and

Landscaping. 










2,000,000
 200
Ketchum ID CDBG 1st
Avenue
Promenade‐
Downtown
Revitaliza3on
of
4
blocks
including
sidewalks,
Roadway,
Ligh3ng
and

Landscaping. 










3,000,000
 300
Ketchum ID CDBG Town
Plaza‐
Consturc3on
of
City
Hall,
underground
parking
garage,
and
town
plaza. 








25,000,000
 2500
Ketchum ID CDBG Community
Core
Streetscaping
Phase
4‐
Infill
sidewalks,
pedestrian
ligh3ng,
and
landscaping. 








59,000,000
 5900
Ketchum ID Energy Guyer
Hot
Springs
Geothermal
Heat
Source.

U3liza3on
of
the
exis3ng
hot
springs
as
a
heat
source
to
heat

homes
and
businesses. 










8,000,000
 800
Ketchum ID Streets/Roads Public
Transporta3on
New
Bus
Shelters
(12) 














60,000
 10
Ketchum ID Streets/Roads Public
Transporta3on
New
Busses
(6) 










1,500,000
 150
Ketchum ID Streets/Roads Public
Transporta3on
Park
&
Ride
Facility
including
bus
garage,
storage,
and
wash
bay. 










3,000,000
 300
Lava
Hot
Spring ID CDBG Main
Street
and
Center
Street
Beau3fica3on 












200,000
 2
Lava
Hot
Spring ID Streets/Roads Construct/Reconstruct
6
miles
of
sidewalk 












360,000
 4
Lava
Hot
Spring ID Streets/Roads Construct
a
4.5
Mile
Bike
Path 












675,000
 7
Lava
Hot
Spring ID Streets/Roads Main
Street
Bridge
Reconstuct 












800,000
 8
Lava
Hot
Spring ID Streets/Roads Reconstruct
3
Miles
of
failed
Roadway 










1,800,000
 18
lewiston ID CDBG 5th
street
marina
and
dock 










1,000,000

lewiston ID CDBG skate
park 












500,000

City State Program Project
Descrip3on Funding
Required Jobs
lewiston ID CDBG twin
ci3es
food
acquisi3on
&
site
clearance 










5,000,000

lewiston ID CDBG orchards
neighborhood
park 










1,800,000
 1
lewiston ID CDBG book
mobile 












200,000
 2
lewiston ID CDBG public
library 










6,000,000
 2
lewiston ID CDBG public
works
maintenance
facility 










1,500,000
 2
lewiston ID CDBG municipal
solid
waste
compost
facility 










3,000,000
 4
lewiston ID CDBG normal
hill
parking
garage 










8,500,000
 4
lewiston ID Public
Safety upgrade
EOC,
police
training
center
&
communica3ons 










1,000,000
 0
lewiston ID Public
Safety fire
sta3on
and
public
safety
training
facility 










3,000,000
 12
lewiston ID Public
Safety remodel
3
fire
sta3ons 










1,500,000
 12
lewiston ID Streets/Roads 17th
street
safety
project 










1,500,000

lewiston ID Streets/Roads Bryden
Avenue
widening 










1,200,000

lewiston ID Streets/Roads Community
park
traffic
mi3ga3ons 










1,500,000

lewiston ID Streets/Roads Highway
12
reloca3on 








20,000,000

lewiston ID Streets/Roads Highway
128
realignment 










2,000,000

lewiston ID Streets/Roads Lewiston
partnership
project,
road
and
u3li3es
throughout
site 










3,000,000

lewiston ID Streets/Roads Main
Steet
rebuild 








15,000,000

lewiston ID Streets/Roads Port
subdivision 










1,300,000

lewiston ID Streets/Roads Powers
Avenue
roundabout 










5,000,000

lewiston ID Streets/Roads sidewalks
to
link
schools
and
neighborhoods 










1,000,000

lewiston ID Streets/Roads Snake
River
roundabout 










2,300,000

lewiston ID Streets/Roads Snake
River
widening 










9,800,000

lewiston ID Streets/Roads Southway
bridge
deck 










6,000,000

lewiston ID Streets/Roads Twelbh
Avenue
extension 










1,900,000

lewiston ID Water airport
east
end
water,
ww
ext. 












300,000

lewiston ID Water golfcourse,
airport
water
line
ext. 










2,500,000

lewiston ID Water raw
water
pump
intake 










1,300,000

lewiston ID Water sewer
plant
upgrades
for
federal
requirements,
reliability 










4,000,000

lewiston ID Water storm
sewers
downtown
to
prevent
flooding,
meet
npdes 










4,000,000

lewiston ID Water waterline
replacement
downtown 












500,000

lewiston ID Water Community
park
sewer 












800,000
 3
Lewiston
 ID Airport airport
parking
lot
expansion 












250,000

Lewiston
 ID CDBG Community
park
grading,
site
prep 










5,000,000

Lewiston
 ID Public
Safety Radio
repeater,
all
weather
access 










5,000,000
 0
Lewiston
 ID Streets/Roads Park
Avenue
extension 










1,800,000
 0
Lewiston
 ID Transit Transit
Maintenance/Parking
Garage
 










2,000,000
 2
Lewiston
 ID Water Southport
water
main
ext. 












500,000
 4
Malad ID CDBG Bannock
Steet
Enhancement/Beau3fica3on 












500,000
 5
Malad ID Streets/Roads Construct/Reconstruct
10
miles
of
Sidewalk 












600,000
 6
Malad ID Streets/Roads Construct
a
5.7
mile
bike
path 












862,500
 9
Malad ID Streets/Roads Reconstruct
5
miles
of
failed
roadway 










3,000,000
 30
Meridian ID CDBG Black
Cat
Lib
Sta3on
Grinder
Pumps
(placed
aber
bar
racks
to
increase
life
and
improve
opera3on
of
lib

sta3on) 












700,000
 2
Meridian ID CDBG Moshers/Merrywood
Sewer
Trunk
(trunk
to
abandon
three
lib
sta3ons) 












500,000
 3
Meridian ID CDBG Ashford
Greens
Sewer
Trunk
(trunk
to
serve
north
Meridian
and
abandon
lib
sta3on) 










1,900,000
 5
Meridian ID Energy Purchase
of
Hybrid
Fleet
Vehicles 












100,000
 2
Meridian ID Energy Digester
Gas
Condi3oning
/
reuse 










1,000,000
 3
Meridian ID Energy Phosphorous
recovery/centrate
treatment 












500,000
 4
Meridian ID Energy Compos3ng
Project 










2,000,000
 5
Meridian ID Streets/Roads Intersec3on
of
Eagle
Road
and
Victory
Road 










1,891,000
 20
Meridian ID Streets/Roads Intersec3on
of
Pine
Avenue
and
Linder
Road 










2,735,000
 30
Meridian ID Streets/Roads Eagle
Road
from
Victory
to
Ridenbaugh
Canal 










3,855,000
 40
Meridian ID Streets/Roads Ten
Mile
Road
from
Cherry
Lane
to
Us3ck 










7,295,000
 75
Meridian ID Streets/Roads Ten
Mile
Road
from
Franklin
to
Cherry
Lane 










9,375,000
 95
Meridian ID Water Land
Purchase
(for
projects
such
as
flow
equaliza3on
and
constructed
treatment
of
wetlands) 










2,500,000
 1
Meridian ID Water Project
Management
(a
City
Employee
to
manage
the
projects) 












100,000
 1
Meridian ID Water Ultraviolet
Disinfec3on
Upgrades
(addi3onal
disinfec3on
at
the
plant) 












250,000
 2
Meridian ID Water WWTP
Black
Cat
Box
Odor
Control
(odor
control
at
one
of
the
influent
structures) 












235,000
 2
Meridian ID Water Coagula3on
Building
for
Chemical
Feed
(chemical
feed
building
for
the
plant) 












150,000
 3
Meridian ID Water WWTP
Digester
Grinder
Pumps
(grinder
pumps
to
help
with
the
diges3on
processes) 












700,000
 3
Meridian ID Water Bioaugmenta3on
(side
stream
nutrient
treatment) 












750,000
 4
Meridian ID Water Digester
1,
2,
and
3
Rehabilita3on
(rehab
of
exis3ng
digesters) 












660,000
 4
Meridian ID Water Manhole
rehabilita3on
/
Repair 










2,000,000
 4
Meridian ID Water Pressure
Zone
1,

3
Pressure
Reducing
Valve
Sta3ons 












450,000
 4
Meridian ID Water WWTP
Plant
Automa3on 












450,000
 4
Meridian ID Water WWTP
Reuse
Demonstra3on
Project
(reuse
project
at
Heroes
Park) 












800,000
 4
Meridian ID Water Headworks
Odor
Control
(building
around
the
headworks
structure
with
odor
control) 










1,000,000
 5
Meridian ID Water IFAS
(fixed
film
process
for
increased
aera3on
basin
capacity) 










1,400,000
 5
Meridian ID Water Primary
Fermenta3on
(conversion
of
two
exis3ng
primary
clarifiers
to
fermenters) 










1,250,000
 5
Meridian ID Water Amity
Road
Waterline 












350,000
 6
Meridian ID Water Downtown
sewer
Rehabilita3on 










1,500,000
 6
Meridian ID Water Well
28
Well
and
Pumphouse 












700,000
 7
Meridian ID Water Headworks
Fine
Screens
(greater
removal
efficiencies
in
the
headworks) 










2,500,000
 8
Meridian ID Water Ter3ary
Filters
Project
(three
cloth
media
filters
and
piping
upgrades) 










3,170,000
 8
Meridian ID Water WWTP
Struvite
Recovery 










2,750,000
 8
Meridian ID Water 2
Million
Gallon
Drinking
Water
Reservoir:
Civil,
Structural,
and
Geotechnical
Engineers
/
Technicians
(6),

Excava3on
and
Earthwork
(6),
Pipe
Crew
(4),
Concrete
/
Metal
Crew
(12),
Coa3ng
Crew
(3),
Electricians
(3),

Paving
Crew
(5),
Landscape
and
Fencing 










4,500,000
 47
City State Program Project
Descrip3on Funding
Required Jobs
Montpelier ID CDBG 5th
and
8th
street
Enhancement/Beau3fica3on 












500,000
 5
Montpelier ID Streets/Roads Construct
a
5.7
mile
Bike
Path 












862,500
 9
Montpelier ID Streets/Roads Construct/Reconstruct
20
miles
of
Sidewalk 










1,200,000
 12
Montpelier ID Streets/Roads Reconstruct
10
miles
of
Failed
roadway 










6,000,000
 60
Murtaugh ID Schools New
Reader
Board 














24,000
 2
Murtaugh ID Streets/Roads Road
Improvements 












380,000
 38
Murtaugh ID Streets/Roads Railroad
Crossings
(2) 












780,000
 78
Murtaugh ID Water Wastewater
Treatment
Facility 










6,600,000
 660
Newdale ID CDBG Street
Light
Enhancement
Program 












500,000
 5
Newdale ID Streets/Roads Construct/Reconstruct
6
miles
of
Sidewalk 












360,000
 4
Newdale ID Streets/Roads Construct
a
5.5
mile
bike
path 












825,000
 8
Newdale ID Streets/Roads Reconstruct
3
miles
of
failed
roadway 










1,800,000
 18
Newdale ID Water Wastewater
Treatment 








25,000,000
 50
Orofino ID Energy Clearwater
County
Woody
Biomass
Cogenera3on
Facility 








30,000,000
 200
Paris ID CDBG Center
Street
and
1st
South
Enhancement/Beau3fica3on 












150,000
 2
Paris ID Streets/Roads Construct/Reconstruct
12
Miles
of
Sidewalk 












720,000
 7
Paris ID Streets/Roads Construct
a
5
mile
Bike
Path 












750,000
 8
Paris ID Streets/Roads Reconstruct
6
miles
of
failed
roadway 










3,600,000
 36
Pocatello ID Airport Complete
air
terminal
expansion
to
improve
func3onality
&
customer
service 










2,500,000
 20
Pocatello ID CDBG Gateway
West
Industrial
complex;
refurbish
internal
rail
lines
to
support
growing
alterna3ve
energy
industries. 










1,000,000
 15
Pocatello ID CDBG Joint
ISU/City
accelerator
research
facility
upgrade
and
rent
assistance 












920,000
 20
Pocatello ID Energy Replace
hea3ng
&
cooling
system,
including
controls
in
Marshall
Library 












150,000
 4
Pocatello ID Energy Retrofit
ligh3ng
in
Marshall
Library
to
achieve
energy
efficiency 














20,000
 4
Pocatello ID Energy Upgrade
&
improve
insula3on
of
Marshall
Library
to
achieve
energy
savings 














75,000
 6
Pocatello ID Housing Moderniza3on/replacement
of
sec3on
236
housing
for
low
income
families 










2,000,000
 35
Pocatello ID Public
Safety Expand
the
Six‐County
Juvenile
Deten3on
Center.

Current
facility
is
at
or
over
capacity
on
a
frequent
basis
and

lacks
treatment
programs 










2,000,000
 6
Pocatello ID Schools Entry
Door
Replacement‐various
schools 












162,000
 5
Pocatello ID Schools Window
Replacement‐Irving
Middle
School 












360,000
 5
Pocatello ID Schools Modernize
each
classroom
with
first‐class
Instruc3onal
technology 










4,500,000
 10
Pocatello ID Schools Roof
Replacement‐Highland
High
School 












170,000
 10
Pocatello ID Schools HVAC
Moderniza3on‐old
Jefferson
School 










1,600,000
 60
Pocatello ID Streets/Roads 2
1/2
Mile
Bridge
replacement
project.

This
bridge
is
in
poor
condi3on
and
is
a
traffic
and
safety
hazard 












288,000
 12
Pocatello ID Streets/Roads Custer
Street
bridge
replacement
project.

Replace
a
40
foot
span,
2‐lane
bridge
over
the
Portneuf
River
that

has
outlived
its
useful
life 












600,000
 20
Pocatello ID Streets/Roads Gathe
Rd
&
Intersec3on
Realignment
‐
safer
for
vehicles/pedestrians 












600,000
 20
Pocatello ID Streets/Roads Gould
St
Overpass
Bridge
‐
repair
&
seal
bridge
&
replace
approach
pavement 












550,000
 20
Pocatello ID Streets/Roads Highway
overlay
project.

Twenty‐seven
miles
of
county
roadways
rate
as
poor
or
very
poor
and
require
overlay

maintenance 










5,400,000
 20
Pocatello ID Transit Remaining
funds
to
replace
obsolete
transit
shop
facility 










1,389,000
 30
Pocatello ID Water Landfill
Gas
Collec3on
System.

To
avoid
EPA
emission
standards,
the
landfill
must
construct
a
landfill
gas

collec3on
system.

This
system
can
also
create
a
renewable
energy
source 










4,500,000
 4
Pocatello ID Water Johnny
Creek
water
line
and
Spaulding
Booster
Sta3on
rebuild.

Necessary
for
pressure
zone
and
water

delivery
integrity
for
both
a
source
of
safe
drinking
water
and
fire
protec3on 












750,000
 15
Pocatello ID Water Oak
and
Harrison
sanitary
sewer
rehabilita3on.

These
sewers
have
aged
well
beyond
effec3ve
life
and
need
to

be
replaced/rehabiliated.

Failure
of
these
systems
threaten
groundwater
and
nearby
businesses
and

residences 












650,000
 15
Pocatello ID Water Northwest
Sewer
Interceptor
Project.

Provide
sewer
service
for
a
large
and
growing
geography
in
the
city's

impact
area.

The
large
number
of
sep3c
systems
currently
in
use
are
a
threat
to
the
ground
water
in
this
area 








22,000,000
 200
Rexburg ID Airport Snow
Plow 












120,000
 0
Rexburg ID Airport Runway
Ligh3ng
Replacement
and
Improvement 












100,000
 1
Rexburg ID Airport Security
Gate
Replacement 












100,000
 1
Rexburg ID Airport Taxi‐way
Repair 














50,000
 1
Rexburg ID Airport ILS
Approach
System 












200,000
 2
Rexburg ID Airport Runway
Chip
Seal 












250,000
 2
Rupert ID Water Rupert
Phase
II
Wastewater 










6,000,000
 600
Salmon ID Energy Lemhi
County
Woody
Biomass
Cogenera3on
Facility 








30,000,000
 200
Shelley ID CDBG Emerson
Street,
Holmes
Ave.
and
Fir
Street
Enhancement/Beau3fica3on 












500,000
 5
Shelley ID Streets/Roads Construct
a
6
mile
Bike
Path 












900,000
 9
Shelley ID Streets/Roads Construct/Reconstruct
20
miles
of
Sidewalk 










1,200,000
 12
Shelley ID Streets/Roads Shelley
Bypass
Road
Construc3on 










4,000,000
 40
Shelley ID Streets/Roads Reconstruct
10
miles
of
failed
roadway 










6,000,000
 60
Shelley ID Water New
Potable
Water
Well 












500,000
 3
Shelley ID Water Water
Distrubu3on
Upgrade 










2,000,000
 10
Shelley ID Water Water
Storage
Tank 










2,000,000
 10
Soda
Springs ID CDBG Downtown,
Center
Street,
and
Hooper
Street
Beau3fica3on 












500,000
 5
Soda
Springs ID Streets/Roads Construct/Reconstruct
12
miles
of
Sidewalk 












720,000
 7
Soda
Springs ID Streets/Roads Construct
a
5.75
mile
Bike
Path 












862,500
 9
Soda
Springs ID Streets/Roads Reconstruct
6
miles
of
failed
roadway 










3,600,000
 36
St.
Charles ID CDBG Street
Light
Enhancement
Program 












150,000
 2
St.
Charles ID Streets/Roads Construct/Reconstruct
6
miles
of
Sidewalk 












360,000
 4
St.
Charles ID Streets/Roads Construct
a
4
mile
Bike
Path 












600,000
 6
St.
Charles ID Streets/Roads Reconstruct
6
miles
of
failed
roadway 










1,800,000
 18
Sugar
City ID CDBG Main
Street,
3rd
South
and
Teton
Ave
Enhancement 












500,000
 5
Sugar
City ID Streets/Roads Construct/Reconstruct
10
miles
of
Sidewalk 












600,000
 6
Sugar
City ID Streets/Roads Construct
a
5
mile
Bike
Path 












750,000
 8
Sugar
City ID Streets/Roads Reconstruct
5
miles
of
failed
roadway 










3,000,000
 30
Sugar
City ID Water Develop
new
wells
water
system
improvements 










1,000,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
Sugar
City ID Water Water
Storage
Tank 










2,400,000
 12
Teton ID CDBG Street
Light
Enhancement
Program 












150,000
 2
Teton ID Streets/Roads 3rd
East
Bridge
Reconstruct 












150,000
 2
Teton ID Streets/Roads Construct/Reconstruct
6
miles
of
Sidewalk 












360,000
 4
Teton ID Streets/Roads Construct
a
4
mile
Bike
Path 












600,000
 6
Teton ID Streets/Roads Reconstruct
3
miles
of
failed
roadway 










1,800,000
 18
Addison IL Streets/Roads Resurfacing
of
approximately
10
miles
of
various
industrial
streets
within
the
village.
Our
industrial
streets
are

typical
2‐lanes,
44
back
to
back
of
curb
and
gufer.
It
will
be
resurfaced
with
1.5
inches

of
bituminous
asphalt,

some
storm
sewers, 








12,200,000
 60
Addison IL Streets/Roads Resurfacing
of
approximately
10
miles
of
various
residen3al
streets
within
the
village.
Our
residen3al
streets

are
typical
2‐lanes,
34
back
to
back
of
curb
and
gufer.
It
will
be
resurfaced
with
1.5
inches

of
bituminous

asphalt,
some
storm
sewers, 










4,400,000
 60
Addison IL Streets/Roads Resurfacing
of
Swib
Road
from
US
20
to
Collins
Avenue,
an
approximate
4
mile
long
village
minor
arterial
 










9,245,000
 60
Addison IL Water Provide
water
to
the
53
Estetes
subdivision
by
the
installa3on
of
eight
inches
diameter
watermains
and
stubs,

valve
vaults,
fire
hydrants,
valve
boxes,
bituminous
patching
and
restora3on
of
disturbed
areas
such
as

parkways,
driveways,
ditches
and
drainage 










4,400,000
 50
Alsip IL Public
Safety COPS
Universal
Hiring
Program 












225,000
 3
Alsip IL Streets/Roads Village
wide
sidewalk
replacement
program 












425,000
 14
Alsip IL Streets/Roads Laramie
Avenue
Reconstruc3on 












600,000
 16
Alsip IL Streets/Roads 128th
Place
and
Ridgeway
Reconstruc3on 












650,000
 22
Alsip IL Streets/Roads Springfield
and
Hamlin
Avenue
Reconstruc3ons 












700,000
 23
Alsip IL Streets/Roads Miscellaneous
local
street
resurfacing 










4,500,000
 150
Alsip IL Water Pump
Sta3on
and
Reservoir
Expansion 












800,000
 21
Alsip IL Water Sanitary
Cured‐in‐Place
Sewer
Lining 










1,000,000
 26
Alton IL CDBG Expansion
of
the
downtown
streetscape
improvement
project
to
compliment
development
projects
currently

under
construc3on,
including
the
Madison
County
Transit
transfer
sta3on
and
the
Landmarks
Boulevard

Pedestrian
Overpass.

Project
improvements
include 












750,000
 100
Alton IL CDBG The
City
of
Alton
seeks
funding
to
complete
an
urban
redevelopment
project
located
within
a
blighted
area
of

Alton's
central
business
district.

The
three
(3)
block
project
area
suffers
from
a
host
of
environmental

remedia3on
and
flood
plain
issues
aber 










2,000,000
 200
Alton IL Streets/Roads Construc3on
of
a
278'
extension
of
Morrison
Avenue
from
Cpl.
Belchik
Memorial
Expressway
(formerly
Indiana

Ave.)
to
Alton
Steel
Industrial
Park.

The
roadway
improvements
would
accommodate
and
improve
access
for

industrial
and
commercial
transport. 












240,000
 100
Alton IL Streets/Roads The
widening
of
Fosterburg
Rd.
from
IL
Route
255
south
to
IL
Route
140.

Project
includes
the
expansion
of

lanes
from
10'
to
12'
plus
the
addi3on
of
a
bi‐direc3onal
turn
lane.

Addi3onal
improvements
include
patching

and
repaving
of
exis3ng
surfaces,
 










4,245,938
 100
Amboy IL CDBG Construc3on
of
an
addi3onal
maintenance
building
that
would
allow
for
more
storage
space
and
maintenance

on
equipment. 












250,000
 7
Amboy IL CDBG Complete
reconstruc3on
of
the
en3re
Provost
Street
sec3on
in
front
of
Central
School,
while
reconstruc3ng
all

the
u3li3es
and
making
drainage
improvements. 










1,000,000
 28
Amboy IL CDBG Providing
a
park
at
the
North
end
of
the
City,
with
a
playground,
sand
volleyball
court,
green
space,
and
a
pool.


Along
with
this
is
a
deten3on
facility
to
prevent
flooding
downstream. 










2,300,000
 64
Amboy IL CDBG Complete
reconstruc3on
of
the
en3re
East
Main
Street
sec3on
while
reconstruc3ng
all
of
the
u3li3es
and

making
drainage
improvements. 










2,500,000
 70
Amboy IL CDBG Complete
reconstruc3on
of
the
en3re
Division
Street
sec3on,
between
Prospect
Street
and
East
Main
Street,

while
reconstruc3ng
all
of
the
u3li3es
and
making
drainage
improvements. 










3,400,000
 95
Arlington
Heights IL CDBG Street
Resurfacing 










1,500,000
 20
Arlington
Heights IL CDBG Street
Rehabilita3on 










2,000,000
 25
Arlington
Heights IL Energy Renewable
Energy;
solar
power
for
downtown
train
sta3on 















1,500

Arlington
Heights IL Streets/Roads Street
Resurfacing 








15,000,000
 20
Arlington
Heights IL Streets/Roads Street
Rehabilita3on 








20,000,000
 25
Arlington
Heights IL Water Sanitary
Lib
Sta3on
Elimina3on 










2,000,000
 10
Arlington
Heights IL Water Water
&
Sewer
Intrastructure
Rehabilita3on 








10,000,000
 20
Aurora IL Airport Airport
Runway
18/36
Reconstruc3on 










3,000,000
 76
Aurora IL Streets/Roads Traffic
Signal
Installa3on
at
4
congested
intersec3ons 












450,000
 24
Aurora IL Streets/Roads Overlay
of
exis3ng
streets 










4,000,000
 82
Aurora IL Transit Construc3on
of
Sta3on
Blvd
from
Liberty
Street
to
the
Metra
Commuter
Sta3on
to
improve
traffic
flow
and
 










7,500,000
 107
Aurora IL Water Combined
Sewer
Overflow
/
Sewer
Separa3on
Project
‐
Basin
13
‐
Phase
2 












600,000
 30
Aurora IL Water Water
Main
replacement
projects
on
5
roadways 










1,910,000
 45
Aurora IL Water Combined
Sewer
Overflow
/
Sewer
Separa3on
Project
‐
Basin
6 










2,200,000
 56
Aurora IL Water Combined
Sewer
Overflow
/
Sewer
Separa3on
Project
‐
Basin
13
‐
Phase
3 










3,000,000
 68
Bartlef IL CDBG West
Bartlef
and
Naperville
Roads
Bike
Path
‐
This
project
consists
of
installing
a
10
foot
wide
bike
path
within
 












276,000
 12
Bartlef IL CDBG Schick
Rd.
Bridge
Repairs
‐
Repairing
the
Schick
Road
Bridge
substructure
and
abutments
as
well
as
the
east
 












430,000
 25
Bartlef IL CDBG Route
25
Road
Improvements
‐
These
road
improvements
will
provide
access
to
the
Blue
Heron
Business
Park

and
the
Bluff
City
Industrial
Park. 










2,499,000
 50
Bartlef IL Water Influent
Pump
Replacement
‐
This
project
consists
of
replacing
the
three
influent
pumps
and
control
system
at

the
Stearns
Road
Wastewater
Treatment
Plant.

The
pumps
were
installed
in
1975.

Since
that
3me
the
pumps

and
drive
system
have
become
obsolete. 












315,000
 6
Bartlef IL Water Stearns
Rd.
Iron
Filter
Tank
Replacement
‐
The
project
consists
of
replacing
the
tank
for
the
exis3ng
iron

removal
filter.

The
exis3ng
tank
is
over
20
years
old
and
has
significant
corrosion. 












275,000
 9
Bartlef IL Water Well
#8
Barium
and
Radium
Removal
System
‐
This
project
consists
of
a
new
treatment
system
to
remove

barium
and
radium
from
Well
#8.

This
well
draws
from
the
same
water
aquifer
as
Well
#4
(Stearns
Road

Booster
Sta3on)
and
Well
#7
(Kent
Circle
Water
Sta3on) 












480,000
 12
Blue
Island IL Streets/Roads Resurfacing
135th
St,
136th
St 










1,200,000
 35
Blue
Island IL Streets/Roads Resurfacing
Grove,
Chatham 










1,300,000
 39
Blue
Island IL Streets/Roads Resurfacing
123rd
Pl,
Krueger,
Orchard,
Collins 










1,500,000
 43
Blue
Island IL Streets/Roads Resurfacing
135th
St,
Mozart,
California,
Vine 










1,350,000
 44
Blue
Island IL Streets/Roads Resurfacing
Groove,
Ann,
James 










1,300,000
 44
City State Program Project
Descrip3on Funding
Required Jobs
Blue
Island IL Streets/Roads Resurfacing
Handicap
Ramps
and
Sidewalk
Replacement 










1,450,000
 49
Blue
Island IL Streets/Roads Resurfacing
Curb
Removal
and
Replacement 










1,500,000
 50
Blue
Island IL Streets/Roads Reconstruc3on
of
119th
Street
and
Division
Street 










1,700,000
 52
Blue
Island IL Streets/Roads Resurfacing
Grunewald,
Orchard,
Greenwood,
Artesian 










1,900,000
 57
Blue
Island IL Streets/Roads Resurfacing
119th
Pl,
120th
St,
120th
Pl,
Gregory 










1,750,000
 60
Blue
Island IL Streets/Roads Resurfacing
Collins,
Cochran,
Lewis,
Birdsall,
Greenwood 










1,800,000
 60
Blue
Island IL Streets/Roads Resurfacing
119th
Pl,
120th
St,
120th
Pl,
121st
St.
Longwood 










1,900,000
 64
Blue
Island IL Streets/Roads Resurfacing
Union,
High,
York,
New 










1,900,000
 65
Blue
Island IL Streets/Roads Resurfacing
Minnesota,
Edison,
Everef,
Wahl,
Francisco,
California 










2,200,000
 74
Blue
Island IL Streets/Roads Resurfacing
Canal,
Rexford,
Gregory,
Irving,
Chicago,
Hoyne,
Seeley 










2,400,000
 80
Blue
Island IL Streets/Roads Street
Ligh3ng 










2,500,000
 83
Blue
Island IL Streets/Roads Resurfacing
120th
Pl,
121st
St,
122nd
St,
Grunewald,
Orchard,
Highland,
Maple,
Ann 










2,600,000
 87
Blue
Island IL Streets/Roads Bridge
Rehabilita3on
Division
Street
Bridge
Over
Calumet
Sag
Channel 










6,500,000
 217
Blue
Island IL Streets/Roads Bridge
Rehabili3on
Chatham
Street
Bridge
Over
Calumet
Sag
Channel 










6,500,000
 217
Blue
Island IL Water Repain3ng
1,000,000
Gallon
Elevated
Tank
(Thorton‐Blue
Island
Road) 












750,000
 25
Blue
Island IL Water Fire
Hydrant
Removal
and
Replacement 












840,000
 30
Blue
Island IL Water Water
valve
removal
and
replacement 












875,000
 30
Blue
Island IL Water Repain3ng
1,000,000
Gallon
Elevated
Tank
(Highland
Avenue) 












900,000
 35
Blue
Island IL Water Manhole
Lining 










1,500,000
 50
Blue
Island IL Water Relining
Combina3on
Sewers 










1,750,000
 60
Bolingbrook IL Airport New
Runway
at
Bolingbrook‐Clow
Airport 








10,000,000

Bolingbrook IL Airport Clow
Airport,
runway
improvements:
widen
exis3ng
runway
to
allow
use
by
larger
planes. 








10,000,000
 22
Bolingbrook IL Airport Clow
Airport:
add
addi3onal
hangers. 










4,000,000
 50
Bolingbrook IL CDBG Kings
Road
Extension 








10,000,000

Bolingbrook IL CDBG Lily
Cach
Lane
Widdening 










4,000,000

Bolingbrook IL CDBG Public
Works
Garage,
add
heavy
duty
shelving:

add
shelving
to
enable
safe
and
cost
effec3ve
storage
of
 












100,000
 5
Bolingbrook IL CDBG Historic
Bolingbrook
sidewalk
construc3on:

phase
11
includes
construc3ng
sidewalks
in
neighborhoods
that
 












200,000
 10
Bolingbrook IL CDBG River
Woods
erosion
control,
phase
2:

installa3on
of
gabion
baskets,
rip‐rap,
and
other
non‐stuctural

measures
to
restore
the
highly
eroded
banks
of
the
creek
in
the
River
Woods
neighborhood. 












200,000
 10
Bolingbrook IL CDBG Boughton
Road
sidewalk:
construct
sidewalk
and
related
work
to
fill
in
missing
gap
in
sidewalk
network
on

Boughton
Road
by
the
Independent
Bap3st
Church. 












200,000
 14
Bolingbrook IL CDBG Barbers
Corners
water
&
sewer:

installa3on
of
water
and
sewer
lines
to
remove
several
houses
from
well
and

sep3c
systems. 












400,000
 15
Bolingbrook IL CDBG Briarcliff
Road
stormsewer:

replace
a
few
hundred
feet
of
stormsewer
on
Briarcliff
Road
as
part
of
the
master

plan
to
resolve
flooding

problems
in
Historic
Bolingbrook. 












500,000
 18
Bolingbrook IL CDBG Cumberland
Pond:

dredging
and
rehabilita3on
of
pond
to
improve
water
quality,
fish
habitat,
and
aeste3cs. 












700,000
 24
Bolingbrook IL CDBG Police
Department
expansion:

construc3on
of
an
addi3on
to
the
curent
Police
Department
facility.









10,000,000
 95
Bolingbrook IL Streets/Roads Full
interchange
at
I‐55
and
Il.
Rt.
126 








12,000,000

Bolingbrook IL Streets/Roads Traffic
signal
at
entrance
to
Gateway
East
and
Costco
site. 












300,000
 5
Bolingbrook IL Streets/Roads Traffic
signal
on
Hassert
Boulevard
and
Kings
Road. 












300,000
 5
Bolingbrook IL Streets/Roads Traffic
signal
on
Remington
Boulevard
and
Schmidt
Road,
plus
interconnect
to
traffic
signal
at
hospital
 












300,000
 5
Bolingbrook IL Streets/Roads Traffic
signal
on
Remington
Boulevard
at
entrance
to
Adven3st
Bolingbrook
Hospital. 












300,000
 5
Bolingbrook IL Streets/Roads Clow
Airport
traffic
Circle:
install
a
traffic
circle
on
Clow
Parkway
to
safely
guide
traffic
into
the
airport. 












100,000
 10
Bolingbrook IL Streets/Roads Frontage
Road
removal:

remove
abandoned
frontage
road
and
replace
with
topsoil
and
turf
from
Weber
Road

to
Remington
Boulevard. 












300,000
 10
Bolingbrook IL Streets/Roads Route
53
entrances
to
Arena
Auto
Auc3on:

remove
obsolete
entrances
/
turn
bays
built
for
former
Old
Chicago

amusement
park. 












100,000
 11
Bolingbrook IL Streets/Roads Kings
Road
landscaped
median:

construct
landscaped
median
to
calm
traffic,
reduce
runoff,
and
beau3fy
the

roadway. 












400,000
 15
Bolingbrook IL Streets/Roads Weber
Road
landscaped
medians,
north
and
south
of
Jennifer
Lane. 












400,000
 15
Bolingbrook IL Streets/Roads Boughton
Road
rehabilita3on,
Pinecrest
to
Schmidt:
repair
curbs
and
stormsewers
then
patch
and
pave

roadway. 










3,000,000
 23
Bolingbrook IL Streets/Roads Road
rehabilita3on
program:

perform
pavement
maintenance
ac3vi3es
up
to
and
including
paving
on
a

number
of
streets
that
have
not
been
paved
in
over
20
years. 










2,000,000
 30
Bolingbrook IL Streets/Roads St.
Andrew's
Drive
extension:

extend
St.
Andrew's
Drive
and
connect
to
quarry
driveway. 












700,000
 48
Bolingbrook IL Streets/Roads Lindsey
Lane,
Lily
Cache
Lane
to
exis3ng
Lindsey
Lane
stub:

construct
new
roadway
to
provide
access
to
Jane

Addams
School
(school
district
project,
with
recapture
from
future
developers). 










1,000,000
 58
Bolingbrook IL Streets/Roads Reagan
Boulevard
from
Danhoff
Lane
to
Plainfield‐Naperville
Road:

reconstruc3on
of
a
two
lane
country
 












900,000
 58
Bolingbrook IL Streets/Roads Traffic
signal
at
St.
James
and
Joliet
Road,
and
roadway
improvements
to
the
north
leg
of
intersec3on. 












800,000
 58
Bolingbrook IL Streets/Roads Kings
Road,
Hassert
to
Rodeo:

construct
urban
cross‐sec3on
roadway
with
landscaped
median
and
bridge
over

the
Lily
Cache
Creek. 










6,800,000
 70
Bolingbrook IL Streets/Roads Lily
Cache
Lane,
Route
53
to
Schmidt
Road:

reconstruct
2
lane
roadway
to
4
lanes
plus
a
landscaped
median. 










5,900,000
 70
Bolingbrook IL Transit I‐55
full
interchange
at
Rt.
126 








12,000,000

Bolingbrook IL Water Sewer
plant
expansion
at
Indian
Boundary
treatment
plant 








10,000,000

Bollingbrook IL Streets/Roads Traffic
signal
on
Route
53
and
Edgehill
Drive
/
Market
Square
Shopping
Center
(Walmart) 












900,000
 58
Bourbonnais IL Streets/Roads Bourbonnais
Creek
Improvements 










1,000,000
 35
Bourbonnais IL Streets/Roads Armour
Road
widening
and
resurfacing 










3,400,000
 121
Bourbonnais IL Streets/Roads Burns
Road
West
reconstruc3on 










4,100,000
 146
Bridgeview IL Streets/Roads Harlem
Avenue
Frontage
Road
Street
Ligh3ng 












187,000
 7
Bridgeview IL Streets/Roads Harlem
Avenue
Sidewalk
and
Curb
Replacement 












200,000
 7
Bridgeview IL Streets/Roads Roadway
Resurfacing
Program 












473,000
 16
Bridgeview IL Streets/Roads Harlem
Avenue
Widening
at
70th
Street 












650,000
 22
Bridgeview IL Streets/Roads Extension
of
Octavia
Avenue
with
U3li3es 










1,900,000
 63
Bridgeview IL Transit 71st
Street
&
Harlem
Avenue
Transporta3on
Center 










1,700,000
 34
Bridgeview IL Water Sanitary
Sewer
Rehabilita3on
South
of
71st
Street 












379,000
 13
Bridgeview IL Water 100th
Place
Storm
Sewer 












450,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Bridgeview IL Water Elevated
Water
Tank
at
71st
Street 










2,100,000
 70
Buda IL CDBG Construct
new
deep
water
supply
well
to
replace
exis3ng
well
that
has
failed,
and
connect
to
Village
treatment
 












600,000
 17
Bureau
Junc3on IL CDBG Construc3on
of
new
building
for
the
fire
department. 












215,000
 6
Bureau
Junc3on IL Water Dredge
aerated
lagoons,
replace
broken
and
deteriorated
valves
and
diffusers,
and
make
repairs
to
sand
filters.













180,000
 5
Bureau
Junc3on IL Water Construc3on
of
a
new
deep
water
well
for
the
purpose
of
removing
elevated
level
of
radium
from
the
water

supply.
Provide
booster
pump,
filtra3on,
and
transmission
water
main
for
newly
acquired
well
to
water

treatment
plant
as
back
up.
 












940,000
 27
Burnham IL Streets/Roads Village‐wide
water
valve
replacement
program. 












105,000
 3
Burnham IL Streets/Roads Village‐wide
manhole
rehabilita3on
program. 












160,000
 4
Burnham IL Streets/Roads Unfunded
grant
for
local
street
resurfacing.
IDOT
has
already
approved
plans,
specifica3ons,
agreements,
and
 












450,000
 12
Carbon
Hill IL CDBG Street
repairs 












350,000
 10
Carbon
Hill IL CDBG Storm
sewer
improvements 












400,000
 11
Carbon
Hill IL CDBG Construc3on
of
a
new
wastewater
treatment
and
collec3on
system.
The
community
has
no
central
sanitary
 










2,275,000
 64
Calumet
City IL Energy LED
Bulb
Replacement
at
traffic
Signals 












326,000
 5
Calumet
City IL Streets/Roads Various
Street
Resurfacing
in
Calumet
City 












550,000
 20
Calumet
City IL Streets/Roads Burnham
Avenue
at
Marble
Street
Intersec3on‐
Intersec3on
Improvement
(intsersec3on
on
Bridge) 










6,900,000
 50
Calumet
City IL Streets/Roads Marble
Street
Roadway‐Roadway
Construc3on
and
New
Bridge
over
the
Grand
Calumet
River 










2,800,000
 50
Calumet
City IL Streets/Roads River
Oaks
Drive
at
Paxton
Ave,
Intersersec3on
Improvement
and
New
Traffic
Signals 












778,000
 50
Calumet
City IL Water Sanitary
and
Storm
Sewer
Lining,
Various
Loca3ons
throughout
Calumet
City 












500,000
 5
Calumet
City IL Water Ground
Reservoir
Rehabilita3on 












650,000
 50
Canton IL CDBG The
City
of
Canton
is
“shovel
ready”
to
upgrade
its
water
and
sewer
system,
downtown
street
and
public
right

of
way
infrastructure,
and
make
improvements
to
the
former
Interna3onal
Harvester
brownfield
site
for

redevelopment
 










2,000,000
 1225
Canton IL Streets/Roads Downtown
public
right
of
way
infrastructure:

To
promote
safe
and
afrac3ve
pedestrian
uses
through

con3nuous
sidewalks,
traffic
calming
features,
enhanced
pedestrian
crossings,
raised
seat‐walls/planters;
curb

bump‐outs;
light
poles
and
other
streetscapes 










4,000,000
 25
Canton IL Water Illinois
Route
78
Water
Main
Replacement:
Replace
sec3ons
of
water
main
that
must
be
relocated
due
to

proposed
improvements
to
Illinois
Route
78.

 












350,000
 10
Canton IL Water Kilroy
Sewage
Pumping
Sta3on
Force
Main
Replacement:
Replace
exis3ng
14”
diameter
sewage
force
main.
 












750,000
 10
Canton IL Water Water
Tower
and
Associated
Water
Main
Improvements:

Proposed
elevated
storage
tank
to
supplement
water

storage
within
the
City’s
water
distribu3on
system.
Proposed
water
main
extensions
to
help
with
pressure
and

flow
problems
throughout
the
City’s
water 








10,000,000
 25
Canton IL Water Wastewater
Treatment
Plant
Improvements:
Increase
capacity
via
a
new
extended
aera3on
ac3vated
sludge

treatment
facility
to
replace
exis3ng
1938
WPA
plant.

Upgrades
include
a
recondi3on
of
return
ac3vated

sludge
sta3ons,
lib
sta3ons
throughout
th 








12,700,000
 50
Canton IL Water Water
Treatment
Plant
Improvements:

Increase
capacity
via
a
new
treatment
facility
to
replace
exis3ng
1938

WPA
plant.

Upgrades
include
installa3on
of
a
new
clarifier,
filters,
pumping
sta3on,
chemical
feed
system,
an

upgrade
of
the
piping
system
and
 










6,000,000
 50
Carpentersville IL CDBG Streetlight
Installa3on
(installa3on
of
~40
addi3onal
streetlights
to
deter
crime
and
enhance
pedestrian
and

motorist
safety) 












250,000
 5
Carpentersville IL CDBG Street,
Sidewalk,
Storm,
Sanitary
Sewer
and
Water
Main
Infrastructure
Improvement
Program
(Aus3n
Avenue,

Houston
Drive,
Salem
Lane,
and
Berkley
Street 










5,000,000
 20
Carpentersville IL CDBG Fire
Sta3on
No.
2
Remodeling
and
Addi3on
(renova3on
of
exis3ng
sta3on
to
meet
present
day
needs
and

address
structural
issue) 










2,000,000
 30
Carpentersville IL CDBG Morningside
Area
Redevlopment
(demoli3on,
crea3on
of
open
space,
construc3on
of
shared
parking
and

dumpster
enclosures,
replacement
of
fencing) 










1,463,000
 32
Carpentersville IL Public
Safety Traffic
Safety
Unit 












212,000
 2
Carpentersville IL Streets/Roads Kings
Road
Resurfacing
(including
some
sidewalk,
curb,
and
gufer
remvoval
and
replacement) 












105,000
 10
Carpentersville IL Streets/Roads Helm
Road
Resurfacing
(including
some
sidewalk,
curb
and
gufer
removal
and
replacement,
as
well
as
some

stormwater
system
improvements) 












410,000
 15
Carpentersville IL Streets/Roads Sleepy
Hollow
Road
and
Miller
Road
Resurfacing,
Related
Repairs,
and
Curb
Installa3on 












270,000
 15
Carpentersville IL Streets/Roads Tulsa
Avenue
Pavement
Resurfacing
(including
some
sidewalk,
curb,
and
gufer
removal
and
replacement) 












240,000
 15
Carpentersville IL Streets/Roads Miller
Road
West
Roadway
Reconstruc3on
(including
construc3on
of
new
curb,
gufer,
and
enclosed

stormwater
drainage
system,
as
well
as
certain
intersec3on
improvements) 










1,700,000
 20
Carpentersville IL Water Replacement
of
Water
System
Controls
and
Installa3on
of
Security
System 












180,000
 3
Carpentersville IL Water Emergency
Power
Generator
for
Main
Wastewater
Treatment
Facility 










1,800,000
 5
Carpentersville IL Water Lining
of
10,000
Lineal
Feet
of
Sanitary
Sewer
Main
to
Eliminate
Infiltra3on
and
Inflow 












400,000
 5
Carpentersville IL Water Sludge
Press
Replacement 










1,000,000
 5
Cedar
Point IL Water Water
main
looping
to
eliminate
dead
ends
and
deep
well
construc3on
for
radium
removal. 










2,434,420
 68
Channahon IL CDBG sanitary
sewer
rehabilita3on
to
correct
inflow/infiltra3on
throughout
the
system
up
to
400
manholes 












200,000
 10
Channahon IL CDBG 1/2
mile
of
2"
asphalt
overlay
on
Ridge
Road
with
shoulder
and
striping
replacement
ready
to
go
Spring
of

2009 












155,000
 15
Channahon IL CDBG sidewalk
addi3on
and
replacement
to
connect
exis3ng
bikepath
along
Rt
6
to
exis3ng
I&M
Canal
parks/walks

Ready
Spring
2009 












100,000
 18
Channahon IL CDBG 1/3
mile
of
3"
asphalt
structural
overlay
on
Tabler
Road
as
it
is
being
used
as
a
truck
route
along
with
shoulder

improvements
and
striping
ready
to
go
in
Spring
2009 












180,000
 20
Channahon IL CDBG 1/2
mile
of
Full
Depth
Reclama3on
of
exis3ng
roadway
and
stabiliza3on
with
asphalt
overlay
on
Hansel
Road

design
complete
awai3ng
spring
2009
construc3on 












250,000
 31
Channahon IL CDBG 3/4
mile
of
12"
duc3le
iron
water
main
connec3ng
two
dead
end
water
mains
from
Old
Kerry
Grove
Road
to

Ridge
Road 












579,000
 35
Channahon IL CDBG 3/4
mile
of
Full
Depth
Reclama3on
of
exis3ng
road
and
stabiliza3on
with
asphalt
overlay
in
Highlands

subdivision
with
curb,
sidewalk
and
storm
sewer
repair
ready
to
go
in
Spring
2009 












560,000
 51
Channahon IL CDBG 1
mile
of
12"
duc3le
iron
water
main
connec3ng
the
main
line
to
a
dead
end
line
to
form
a
loop
on
Dove
drive 












780,000
 55
Channahon IL CDBG 1
mile
of
road
to
be
reconstructed,
widened
to
accomodate
growing
traffic
between
two
towns.

Also,
we
need

to
add
shoulders
and
ditches,
replacing
culverts
Ready
to
go
in
Spring
2010 












675,000
 55
City State Program Project
Descrip3on Funding
Required Jobs
Channahon IL CDBG 3/4
mile
of
reconstruc3on
on
Blackberry
Dr
which
is
the
only
access
point
for
the
educa3on
center
and
public

works
garage
phase
1&2
engineering
Spring
09
and
construct
Fall
09
to
Spring
2010 












489,000
 55
Channahon IL CDBG Interconnec3ng
1
mile
of
bikepath/
safe
passage
from
west
side
of
town
to
east
side
of
town
and
park

district/shopping
area
located
along
Bridge
Street
ready
to
build
in
fall
2009 












299,000
 57
Channahon IL CDBG new
water
tower
for
the
industrial
area
east
of
I55 










1,540,000
 85
Channahon IL CDBG Reconstruc3on
and
widening
of
1/2
mile
of
class
2
truck
route
on
Dellos
Road
with
rehabilita3on
of
100
year

old
bridge 










1,575,000
 95
Cherry IL Water Rehabilita3on
of
treatment
plant. 












365,000
 10
Cherry IL Water Construc3on
of
holding
pond
for
backwash
water,
rehabilita3on
of
treatment
plant
and
watermain

replacement
in
cri3cal
areas. 












765,000
 21
Chicago
Heights IL Energy Division
Pump
Sta3on.

The
installa3on
would
include
an
80
KVA
Diesel
Generator,
with
assiciated

weatherproff
sound
afenuated
enclusre,
integral
light
fixture,
(for
security),
ATS
(automa3c
transfer
switch)

and
relat 














80,000

Chicago
Heights IL Energy East
End
Pump
Sta3on.

The
installa3on
would
include
a
100
KVA
Diesel
Generator,
with
associated

weatherproof
sound
afenuated
enclosure
integral
light
fixture,
for
security),
ATS
(automa3c
transfer
switch),

and
relat 












150,000

Chicago
Heights IL Energy State
Street
Pump
Sta3on
The
installa3on
would
include
a
275
Diesel
Generator. 












160,000

Chicago
Heights IL Energy Holbrook
Sanitary
Lib
Sta3on(at
Hamil3on
Woods)

The
installa3on
would
include
a
20
KVA
Diesel
Generator,

with
assiciated
weatherproof
sound
afenuated
enclosure,
integral
light
fixture
(
for
security),
ATS
(automa 














40,000
 20
Chicago
Heights IL Energy Joe
Orr
Sanitary
LIb
Sta3on
and
Storm
Water
Lib
Sta3on.

The
installa3on
would
include
a
20
KVA
Diesel

Generatork
with
associated
weatherproof
sound
afenuated
enclosure,
integral
light
fixture
(for
security),
ATS 














80,000
 50
Chicago
Heights IL Energy Lowe
Pump
Sta3on.

The
installa3on
would
indlude
a
325
KVA
Diesel
Generator,
with
associated
weatherproof

sound
afenuated
enclosure,
integral
light
fixture
(for
security),
ATS
(automa3c
tranfer
switch),
and
related 












220,000
 50
Chicago
Heights IL Energy Public
Works
Garage.

The
installa3on
would
include
an
80
KVA
Diesel
Generator,
with
associated
interior

shound
afenuated
enclosure,
ATS
(automa3c
transfer
switch),
and
related
components,
conduit,
and
wiring,

etc.

t 














70,000
 50
Chicago
Heights IL Energy Lansing
Pump
Sta3on.

a.

The
installa3on
would
include
a
450
KVA
Diesel
Generator,
with
associated

weatherprof
sound
afenuated
enclosure,
integral
light
fixture
(for
security),
ASS
(automa3c
transfer
switch),

and 












280,000
 60
Chicago
Heights IL Public
Safety Police
Department.


Purchase
of
four
unmarked
police
vehicles.

This
is
to
replace
older
vehicles.

Purchase
of

six
marked
police
vehicles.

Puchase
of
two
marked
traffic
unit
vehicles 












259,238
 12
Chicago
Heights IL Streets/Roads Street
Resurfacing
Ward
1 












175,000
 15
Chicago
Heights IL Streets/Roads Street
Resurfacing
Ward
2 












150,000
 15
Chicago
Heights IL Streets/Roads Street
Resurfacing
Ward
3 












200,000
 15
Chicago
Heights IL Streets/Roads Street
Resurfacing
Ward
4 












180,000
 15
Chicago
Heights IL Streets/Roads Street
Resurfacing
Ward
5 












170,000
 15
Chicago
Heights IL Streets/Roads Street
Resurfacing
Ward
6 












175,000
 15
Chicago
Heights IL Streets/Roads Division
Street
improvements
surrounds
two
schools.

One
of
the
schools
being
a
specialized
development
 












524,927
 50
Chicago
Heights IL Water Paint
Lansing
Booster
Sta3on 












150,000
 6
Chicago
Heights IL Water Replace
120
Substandard
Fire
Hydrants 












960,000
 6
Chicago
Heights IL Water Replace
75
Substandard
Water
Valves 












500,000
 6
Chicago
Heights IL Water B‐Box
Replacement
Program 












500,000
 8
Chicago
Heights IL Water Paint
Division
Street
Reservoir 












150,000
 8
Chicago
Heights IL Water Paint
Lowe
Avenue
Reservoir 












170,000
 8
Chicago
Heights IL Water Paint
State
Street
Elevated
Water
Tank 












950,000
 8
Chicago
Heights IL Water Paint
State
Street
Ground
Storage
Reservoir 












500,000
 8
Chicago
Heights IL Water Generator
Installa3on
of
Pump
Sta3ons
and
Lib
Sta3ons 










1,080,000
 10
Chicago
Heights IL Water Sewer
Lining
‐
City
wide 










1,000,000
 12
Chicago
Heights IL Water Replace
2750'
of
36"
Water
Main
under
I‐80 










2,800,000
 25
Cicero IL Housing HOME
REPAIR
PROGRAM
 










2,000,000
 70
Cicero IL Housing EMERGENCY
ASSISTANCE
HOUSING
PROGRAM 










3,025,000
 91
Cicero IL Streets/Roads STREET
RESURFACING/RECONSTRUCTION

The
Town
of
Cicero’s
proposed
project
would
consist
of
resurfacing
or
reconstruc3ng
more
than
20
miles

(108,680
lineal
feet)
of
streets.
More
than
100
blocks
would
be
involved
at
an
es3mated
cost
of
$16,250,000.
 








16,250,000
 772
Cicero IL Water NEW
WATER
PUMPING
STATION
The
Town
of
Cicero’s
propose
project
would
consist
of
a
pumping
sta3on
on
the
side
of
the
Town
including
an

addi3onal
City
of
Chicago
water
connec3on.

This
will
provide
befer
fire
flow
rates
for
exis3ng
commercial 








14,000,000
 560
Coal
City IL CDBG Mul3‐faceted
project
includes
traffic
management,
storm
water
conveyance,
ADA
modifica3ons
and
street

scape
improvements
top
jump
start
retail
investment
in
a
newly
burgeoning
residen3al
community. 










4,500,000
 126
Coal
City IL Water Storm
sewer
re‐construc3on
project.

Rebuild
aging
storm
sewers
according
to
established
plan. 










6,000,000
 168
Crest
Hill IL CDBG East
Bain
Manhole
Rehabilita3on 












500,000
 15
Crest
Hill IL CDBG Dearborn
St.
Watermain
Replacement 












600,000
 20
Crest
Hill IL CDBG Hickory
St.
Watermain
Replacement 












850,000
 20
Crest
Hill IL CDBG Nicholson
St.
Watermain
Replacement 












750,000
 20
Crest
Hill IL CDBG City‐wide
Street
Resurfacing 










1,500,000
 25
Crest
Hill IL CDBG East
Bain
Sewer
Lining 










2,800,000
 40
Crest
Hill IL Water East
Basin
Manhole
Rehabilita3on 












500,000
 15
Crest
Hill IL Water Dearborn
St.
Watermain
Replacement 












600,000
 20
Crest
Hill IL Water Hickory
St.
Watermain
Replacement 












850,000
 20
Crest
Hill IL Water Nicholson
St.
Watermain
Replacement 












750,000
 20
Crest
Hill IL Water East
Basin
Sewer
Lining 










2,800,000
 25
Crystal
Lake IL CDBG Virginia
Street
Corridor
Project
‐

The
project
would
add
streetscape,
overhead
u3lity
reloca3on,
repaving,
new
 










5,452,000
 60
Crystal
Lake IL CDBG Vulcan
Lakes
Improvements
‐
The
first
phase
of
this
new
public
recrea3on
facility
includes
water
and
sewer
 










9,550,000
 100
Crystal
Lake IL CDBG Downtown
Parking
Structure‐
The
City
would
greatly
expand
parking
opportuni3es
with
the
construc3on
of
a

416
space
parking
structure
in
Historic
Downtown
Crystal
Lake. 








11,508,000
 130
Crystal
Lake IL Water Northwest
Area
Trunk
Sewer
‐
The
project
is
divided
into
$14,000,000
for
sanitary
sewer
and
$2,000,000
for

storm
sewer
improvements
to
provide
sanitary
sewer
service
for
the
City’s
northwest
area. 








16,000,000
 190
City State Program Project
Descrip3on Funding
Required Jobs
Dalzell IL CDBG Construc3on
of
new
well
to
provide
a
reliable
source
of
water.













524,000
 15
Depue IL CDBG Replace
obsolete
and
aging
tornado
sirens
that
do
not
cover
a
large
residen3al
area
of
the
Village. 














50,000
 1
Depue IL CDBG Complete
cleaning
and
re‐coa3ng
of
a
150,000
gallon
standpipe
water
storgae
facility. 












125,000
 4
Depue IL CDBG Re‐surfacing
of
four
streets
in
the
village. 












549,000
 15
Depue IL Water Replace
badly
deteriorated
sanitary
sewer
mains,
rehabilitate
por3ons
of
wastewater
treatment
plant,
replace
 












925,000
 26
Diamond IL CDBG Storm
sewer
improvements. 












500,000
 14
Diamond IL CDBG Complete
construc3on
of
Smith
Road
(now
a
gravel
surface)
to
open
up
an
area
for
development 












750,000
 21
Diamond IL CDBG Complete
reconstruc3on
of
Will
Road
with
intersec3on
improvements
at
Division
Street.

Will
open
an
area
for

development
in
this
rapidly
growing
community. 










1,000,000
 28
Diamond IL CDBG Construc3on
of
new
water
treatment
plant
to
consolidate
and
remove
elevated
levels
of
radium
in
the
water

supply. 










2,435,000
 68
East
Brooklyn IL CDBG Storm
sewer
improvements 












150,000
 4
East
Brooklyn IL CDBG Street
repairs 












150,000
 4
Elgin IL Streets/Roads Kimball
Street
Resurfacing 












500,000
 12
Elgin IL Streets/Roads McLean
Blvd
Resurfacing 












500,000
 12
Elgin IL Streets/Roads Big
Timber
Road
Resurfacing 










1,000,000
 20
Elgin IL Streets/Roads South
Street
Reconstruc3on 










1,500,000
 20
Elgin IL Streets/Roads Spartan
Drive
Reconstruc3on 










3,000,000
 30
Elgin IL Streets/Roads Villa
Street
Resurfacing/Rechanneliza3on 










3,000,000
 30
Elgin IL Streets/Roads Riverside
Drive
Deck
Replacement 








11,000,000
 80
Elgin IL Streets/Roads Neighborhood
Street
Rehabilita3on 








10,000,000
 100
Elgin IL Water Kimball
Street
Dam
Repairs 










2,000,000
 30
Elgin IL Water Highland
Combined
Sewer
Sepera3on 










4,500,000
 35
Elgin IL Water Route
20
Watermain
Construc3on 










2,000,000
 35
Elgin IL Water Airlite
Treatment
Plant
Rehabilita3on 








14,000,000
 100
Evanston IL CDBG Mason
Park
‐
Community
park
landscaping
improvements 














50,000
 0.5
Evanston IL CDBG Fire
Sta3on
#1
‐
1332
Emerson
‐
Replacement
of
windows 












100,000
 1
Evanston IL CDBG Levy
Senior
Center
‐
Renova3ons
to
install
gymnasium
draperies 












100,000
 1
Evanston IL CDBG Hobart
Park
‐
Neighborhood
park
and
playgound
renova3on 












250,000
 2.5
Evanston IL CDBG Brummel‐Richmond
Park
‐
Neighborhood
park
and
playground
renova3on 












300,000
 3
Evanston IL CDBG Fireman's
Park
‐
Neighborhood
park
and
playground
renova3on 












350,000
 3.5
Evanston IL CDBG Fleetwood‐Jourdain
Community
Center
‐
renova3ons
to
arts
and
crabs
room
and
gymnasium
roof. 












400,000
 4
Evanston IL CDBG Police/Fire
Firing
Range
‐
renova3on
of
Police
firing
range 












450,000
 4.5
Evanston IL CDBG Harbert
Park
‐
Community
park
improvements 












500,000
 5
Evanston IL CDBG Philbrick
Park
‐
Neighborhood
park
and
playground
renova3on 












500,000
 5
Evanston IL CDBG Twiggs
Park
‐
Community
park
pathway
and
landscaping
improvements 












800,000
 8
Evanston IL CDBG Foster
Field
‐
Community
park
football/sobball
field
renova3ons
and
landscaping. 










2,000,000
 20
Evanston IL CDBG Civic
Center
‐
replacement
of
roof
at
Evanston's
Municipal
Government
Civic
Center 










2,700,000
 27
Evanston IL CDBG James
Park
‐
Community
park
ligh3ng
and
electrical
system
upgrades,
parking
lot
renova3ons,
athle3c
field
 










3,000,000
 60
Evanston IL CDBG Crown
Center
‐
Community
Center
and
ice
complex
renova3ons
to
meet
building,
life
safety
and
ADA
code
 








10,000,000
 100
Evanston IL Energy Complete
energy
efficient
ligh3ng
upgrade
at
the
Municipal
Service
Center. 












104,000
 1
Evanston IL Energy Installa3on
of
solar
panels
at
Fire
Sta3on
#1
‐
1332
Emerson
and
Fire
Sta3on
#4
‐
1817
Washington. 














30,000
 1
Evanston IL Streets/Roads Bridge
Rehabilita3on
‐
Isabella
Street
over
the
North
Shore
Channel
‐
joint
replacement,
patching,
deck
and

approach
overlay
‐
contract
documents
can
be
out
in
90
days. 












275,000
 6
Evanston IL Streets/Roads Construc3on
of
block
curb
and
sidewalk
and
ADA
ramps
at
various
loca3ons
Citywide 












600,000
 6
Evanston IL Streets/Roads Maple
Avenue
Streetscape
Project
‐
Design
Complete
‐
Clark
to
Church
Street 












350,000
 6
Evanston IL Streets/Roads Central
Street
Signal
Upgrade
Project
‐
Design
Complete
‐
Signal
upgrades
of
Central/Ridge
and
Central/Girard. 












540,000
 7
Evanston IL Streets/Roads Public
Alley
Paving
Projects
‐
7
alleys
‐
design
in
process. 












800,000
 8
Evanston IL Streets/Roads Bridge
Rehabilita3on
‐
Central
Street
over
the
North
Shore
Channel
‐
substructure
repair,
deck
patching,
beam

repairs
‐
contract
documents
can
be
out
in
90
days. 










1,150,000
 10
Evanston IL Streets/Roads Chicago
Avenue
Streetscape
Project
‐
Design
Complete
‐
Lee
to
Greenleaf
(east
side)
and
Main
to
South
Blvd.

(west
side). 










2,100,000
 15
Evanston IL Streets/Roads Citywide
Street
Resurfacing
Program
‐
Design
complete
in
January
2009
on
resurfacing
18
streets
throughout

the
City. 










4,000,000
 22
Evanston IL Water Tuckpoin3ng
of
Water
Plant
Pumping
Sta3on 












250,000
 3
Evanston IL Water Rehabilita3on
of
underdrain
and
media
composi3on
of
filters
19
through
24. 










2,500,000
 8
Evanston IL Water Water
Main
Replacement
‐
Design
Complete
on
3,500
linear
feet
of
water
main
throughout
the
City. 










1,500,000
 10
Evanston IL Water Installa3on
of
the
Emergency
Interconnect
with
the
Village
of
Wilmefe. 










1,400,000
 14
Evanston IL Water Purchase,
installa3on
and
implementa3on
of
the
Supervisory
Control
and
Data
Acquisi3on
(SCADA)
system. 










1,500,000
 14
Frankfort IL CDBG LaGrange
Road
Sidewalk 












200,000
 15
Frankfort IL CDBG Frankfort
Square
Sewer
Lining 










2,000,000
 40
Frankfort IL Streets/Roads LaGrange
Rd
Sidewalk 












200,000
 10
Frankfort IL Streets/Roads Village‐wide
Resurfacing 










1,200,000
 30
Frankfort IL Water Golf
Ln/Hackberry
Watermain
Replacement 












600,000
 25
Frankfort IL Water Connec3cut
Hills
Watermain
Replacement 










1,000,000
 40
Frankfort IL Water Connec3cut
Hills
Watermain
Replacement
B 










1,000,000
 40
Frankfort IL Water Connec3cut
Hills
Watermain
Replacement
C 










1,000,000
 40
Frankfort IL Water SW
Quad
Water
Tower 










2,500,000
 40
Frankfort IL Water 80th
Ave
Wells
&
Iron
Removal 










3,300,000
 50
Gardner IL CDBG Replace
deteriorated
and
undersized
mains
to
provide
safe
water
supply
to
residents. 












400,000
 11
Gardner IL CDBG Storm
sewer
improvements 












400,000
 11
Gardner IL CDBG Street
repairs 












400,000
 11
Glendale
Heights IL CDBG Lynn
Court
Landscaping 















5,000
 0.2
Glendale
Heights IL CDBG Pearl
Avenue
Landscaping 














13,000
 0.5
Glendale
Heights IL CDBG Lynn
Court
Sanitary
Sewer
R&R 














14,750
 0.6
City State Program Project
Descrip3on Funding
Required Jobs
Glendale
Heights IL CDBG Sidney
Avenue
Landscaping 














23,000
 1
Glendale
Heights IL CDBG Pearl
Avenue
Sanitary
Sewer 














38,900
 1.5
Glendale
Heights IL CDBG Police
Department
ADA
Ramp 














40,000
 2
Glendale
Heights IL CDBG Sidney
Avenue
Sanitary
Sewer
R&R 














70,750
 2.8
Glendale
Heights IL CDBG Lynn
Court
Roadway
Reconstruc3on 












118,500
 4.7
Glendale
Heights IL CDBG Pearl
Avenue
Roadway
Reconstruc3on 












325,650
 13
Glendale
Heights IL CDBG Cambria
Park
Rehabilita3on 












375,000
 15
Glendale
Heights IL CDBG Sidney
Avenue
Roadway
Reconstruc3on 












620,000
 24.8
Glendale
Heights IL CDBG Civic
Center
Parking
Lot
Expansion
and
ADA
Improvements 










1,420,000
 25
Glendale
Heights IL CDBG Senior
Ci3zen
Center 










1,614,600
 27
Glendale
Heights IL CDBG Sports
Hub
ADA
Improvements 










1,700,000
 27
Glendale
Heights IL Public
Safety Police
Squad
Car
Video
Cameras
(10) 














55,000
 0
Glendale
Heights IL Public
Safety Red
Light
Cameras/Technology 














96,000
 0
Glendale
Heights IL Public
Safety One
Addi3onal
Police
Officer 














80,000
 1
Glendale
Heights IL Public
Safety Red
Light
Camera
Monitoring 














67,000
 1
Glendale
Heights IL Schools Dist.
15/Safety
Improvement
‐
Reskin
School 















5,000

Glendale
Heights IL Schools Dist.
16/50
Document
Cameras
for
instruc3onal
areas 














42,000
 0
Glendale
Heights IL Schools Dist.
15/Emergency
Intercom
System
‐
Reskin
School
&
Winnebago 














60,000
 2
Glendale
Heights IL Schools Dist.
16/LCD
Projectors
in
34
Instruc3onal
Areas 












120,000
 2
Glendale
Heights IL Schools Hardware
for
connec3on
between
Learning
Center
&
District
WAN 














43,000
 2
Glendale
Heights IL Schools Dist.
16/Upgrade
36
Bathrooms 












500,000
 4
Glendale
Heights IL Schools 196
HP
Computerers
(or
like),
10
LCD
Projectors
&
Smartboards
for
Computer
Labs 












200,000
 6
Glendale
Heights IL Schools Dist.
15/Building
Renova3ons
‐
Winnego
School 












600,000
 15
Glendale
Heights IL Schools Parking
Lot
Improvements
‐
4
Buildings 










1,200,000
 20
Glendale
Heights IL Streets/Roads 2010
Local
Road
Projects 










3,300,000
 150
Glendale
Heights IL Streets/Roads 2009
Local
Road
Projects 










4,700,000
 188
Glendale
Heights IL Water Bloomingdale
Road
Sewer
Replacement
Project 












620,000
 25
Glendale
Heights IL Water WPCF
Ter3ary
Filter
Replacement
Project 










3,209,000
 50
Glenview IL Streets/Roads Baxter
Ped
Trail 












140,000
 4
Glenview IL Streets/Roads Glenview/Washington
Signaliza3on 












300,000
 4
Glenview IL Streets/Roads Ped
Signal
Upgrades 












515,000
 5
Glenview IL Streets/Roads Glenview
and
Central
Road
Resurfacing 










3,500,000
 17
Glenview IL Water Sanitary
Sewer
Lining 












100,000
 3
Glenview IL Water E.
Bank
Stabiliza3on 












230,000
 4
Glenview IL Water Storm
Sewer
Lining 












400,000
 4
Glenwood IL Public
Safety Main
Street
public
safety
site
development 










1,850,000
 22
Glenwood IL Streets/Roads Street
sign
replacement
program 














50,000
 2
Glenwood IL Streets/Roads ADA
compliance
sidewalk
replacement
program 














75,000
 4
Glenwood IL Streets/Roads Estates
area
resurfacing 












100,000
 4
Glenwood IL Streets/Roads Original
Glenwood
area
resurfacing 












100,000
 4
Glenwood IL Streets/Roads Forest
area
resurfacing 












225,000
 8
Glenwood IL Streets/Roads Brookwood
Point
area
resurfacing 












275,000
 10
Glenwood IL Streets/Roads Manor
area
resurfacing 












275,000
 10
Glenwood IL Streets/Roads Glenwoodie
entrance
road
improvement 










4,500,000
 15
Glenwood IL Streets/Roads Fairways
road
improvement
‐
Phase
1 










5,000,000
 20
Glenwood IL Water Water
valve
exercise
&
leak
detec3on
program 














50,000
 3
Glenwood IL Water Water
valve
replacement
‐
Forest
area 














50,000
 3
Glenwood IL Water Watermain
replacement
on
Willow
from
Center
to
Clark 












200,000
 4
Glenwood IL Water Prepratory
cleaning
&
internal
sewer
television
inspec3on 












150,000
 5
Glenwood IL Water Village
wide
ouzall
replacements 














50,000
 5
Glenwood IL Water Arquilla
Park
flood
relief 












125,000
 6
Glenwood IL Water Water
looping
‐
Industrial
Park
to
Glenwoodie 












950,000
 6
Glenwood IL Water Fire
Hydrant
extensions
&
replacements 












200,000
 7
Glenwood IL Water Water
Valve
replacement
program 












175,000
 7
Glenwood IL Water Forest
Area
Ouzall
Replacement 












200,000
 8
Glenwood IL Water Sewer
lining
Glenwood‐Chicago
Heights
Road 












250,000
 8
Glenwood IL Water Water
looping
‐
Fairways
to
1
MG
reservoir 












275,000
 10
Glenwood IL Water Estates,
Manor
&
Forest
areas
manhole
rehabilita3on 












350,000
 11
Glenwood IL Water Water
looping
‐
Komer
pump
sta3on
to
industrial
park 












750,000
 12
Glenwood IL Water Forest
area
watermain
replacement 












500,000
 14
Glenwood IL Water Arquilla
Dr
Elevated
Tank
Pain3ng 












450,000
 15
Glenwood IL Water Main
St
forcemain
replacement 












425,000
 15
Glenwood IL Water Original
Glenwood
flood
relief 










1,750,000
 22
Grand
Ridge IL CDBG Construct
new
well
and
water
treatment
for
the
purpose
of
removing
elevated
levels
of
arsenic
in
the
water. 










1,180,000
 33
Granite
City IL Streets/Roads St.
Clair
Avenue
Extension 










2,750,000
 70
Granite
City IL Streets/Roads Maryville
Road
Reconstruc3on‐This
project
consists
of
patching
and
resurfacing
of
Maryville
Road
from
Illinois

Route
162
to
Illinois
Route
203.

Maryville
Road
is
an
exis3ng
4‐lane
roadway.

The
length
of
this
improvement

is
19,520’.

 










4,900,000
 100
Granite
City IL Streets/Roads Cleveland
Ave
&
21st
St.‐This
project
consists
of
the
reconstruc3on
of
Cleveland
Avenue
from
16th
Street
to

Niedringhaus
Avenue
and
the
reconstruc3on
of
21st
Street
from
Edwardsville
Road
to
Monroe
Avenue.

Both

Streets
are
2‐lane
roadways. 










4,025,000
 120
Granville IL CDBG Construc3on
project
to
permanently
separate
storm
and
sanitary
sewers
in
cri3cal
parts
of
the
Village.

This

will
eliminate
back‐ups
of
raw
sewage
into
resident's
homes.
 












545,000
 15
Harvey IL Transit Pavement
Resurfacing
Spaulding
Street
from
147th
Street
to
145th
Street 












260,000
 9
Harvey IL Transit Pavement
Resurfacing
Ashland
Avenue
from
144th
Street
to
147th
Street













390,000
 13
Harvey IL Transit Pavement
Resurfacing
Calumet
Blvd.
from
Halsted
to
Park
Avenue 












415,000
 14
Harvey IL Transit Pavement
Resurfacing
167th
Street
from
Lathrop
to
Halsted 












520,000
 17
City State Program Project
Descrip3on Funding
Required Jobs
Harvey IL Transit Neighborhood
Street
Ligh3ng
Wood
Street
147th
Street
to
159th
Street 












600,000
 20
Harvey IL Transit Pavement
Resurfacing
167th
Street
from
Lathrop
to
Center 












800,000
 27
Harvey IL Transit Pavement
Resurfacing
Robey
Street
from
147th
Street
to
155th
Street 












900,000
 30
Harvey IL Water Concrete
Water
Reservoir
500,000
gallons
interior
and
exterior
repain3ng 














90,000
 5
Harvey IL Water Concrete
Water
Reservoir
4,000,000
gallons
interior
and
exterior
repain3ng 












250,000
 10
Harvey IL Water Concrete
Water
Reservoir
5,000,000
gallons
interior
and
exterior
repain3ng 












290,000
 10
Harvey IL Water Water
Valve
Replacement
8"
inch
25
each 












275,000
 10
Harvey IL Water Concrete
Water
Reservoir
5,000,000
gallons
interior
and
exterior
repain3ng 












330,000
 15
Harvey IL Water Water
Valve
Replacement
6"
inch
50
each 17
Hennepin IL CDBG Construc3on
of
enhancements
to
large
wetland
area
including
canoe
access,
bike
paths,
foot
bridge,
 










3,200,000
 90
Hickory
Hills IL Public
Safety Purchase
of
a
Special
Response
Team
Command
Vehicle.

This
vehicle
will
be
designed
for
use
by
the
 












450,000
 0
Hickory
Hills IL Public
Safety Crea3on
and
implementa3on
of
a
Community
Service
Officer
Program.
These
non
sworn
civilian
personnel

would
be
responsible
for
support
func3ons
such
as
parking
enforcement
and
arrest
processing.

This
would

free
up
significant
3me
for
sworn
police
offi 














41,000
 2
Hickory
Hills IL Streets/Roads City
wide
sidewalk
replacement 












375,000
 13
Hickory
Hills IL Streets/Roads City
wide
resurfacing
program 










4,696,000
 157
Hickory
Hills IL Water Sanitary
Sewer
Lib
Sta3on
Elimina3on 












150,000
 5
Hickory
Hills IL Water Kean
Avenue
Water
Main
Extension 












250,000
 8
Hickory
Hills IL Water Deten3on
Pond
Enhancement/Storm
Water
Pollutant
Elimina3on 












500,000
 13
Hickory
Hills IL Water Sanitary
sewer
cured‐in‐place
lining 












750,000
 20
Hickory
Hills IL Water 85th
Avenue
Storm
Sewer 












800,000
 21
Hickory
Hills IL Water Lib
Sta3on
Replacement 












900,000
 30
Highland
Park IL Energy Energy
Retrofits
for
All
Government
Buidlings 










1,000,000
 12
Highland
Park IL Energy Energy
Retrofits
for
All
School
Buildings 










1,000,000
 12
Highland
Park IL Energy Energy
Retrofits
for
Public
Library 










1,000,000
 12
Highland
Park IL Energy Electrical
upgrades
in
Central
Business
District
from
110V
to
220V
electric
to
reduce
energy
consump3on
for
 












500,000
 19
Highland
Park IL Streets/Roads Improvements
to
Route
41
pedestrian/bicycle
overpass. 












300,000
 12
Highland
Park IL Streets/Roads Ravine
Drive
bridge
improvements. 












800,000
 22
Highland
Park IL Streets/Roads Repaving
of
Sheridan
Road
and
minor
sewer
repairs. 










1,500,000
 24
Highland
Park IL Streets/Roads Repair
of
exis3ng
City
sidewalks
and
extension
of
greenways.

Installa3on
of
extensions
or
new
paths
for

pedestrians
and
cyclists,
providing
alterna3ves
to
motor
vehicles. 










1,000,000
 32
Highland
Park IL Streets/Roads Resurface
12
‐
14
miles
of
City
thus
raising
streets
with
pavement
condi3ons
of
poor/fair
to
good
(75+
PCI
on
a

scale
of
0
‐
100). 










3,000,000
 37
Highland
Park IL Water Sanitary
sewer
main
and
sanitary
manhole
lining 










2,000,000
 12
Highland
Park IL Water Targeted
sanitary
sewer
main
"spot'
repairs 










1,000,000
 12
Highland
Park IL Water Ravine
improvements
such
as
check
dams
or
other
erosion
control
measures
where
public
infrastructure

systems
are
located
in
the
ravine. 












400,000
 17
Highland
Park IL Water Replace
residen3al
water
meters
with
smaller,
radio
head
technology
to
reduce
waste
and
encourage

conserva3on. 










3,800,000
 17
Highland
Park IL Water Installa3on
of
micro‐filtra3on
membranes
for
City's
Water
Treatment
plant
serving
65,000
customers. 










7,400,000
 22
Highland
Park IL Water Storm
sewer
priori3es 










3,000,000
 27
Hoffman
Estates IL Energy Rehabilitate
exisitng
light
system
components
at
the
Public
Works
facility
to
reduce
energy
consump3on.


Project
is
ready
to
bid.

 














25,000

Hoffman
Estates IL Streets/Roads Street
Reconstruc3ons
Descrip3on:
Several
streets
in
Hoffman
Estates
are
in
very
poor
condi3on
and
in
need
of
full
reconstruc3on.
These
streets
include:
∙
Hassell
Road
from
Barrington
to
Hun3ngton,
including
culverts
($3.5
M)
∙
Berkley
Lane
from
 










6,900,000
 30
Hoffman
Estates IL Water Business
District
Stormwater
Culvert
Replacement
Descrip3on:
Construc3on
of
a
48
inch
diameter
storm
sewer
to
correct
a
long‐standing
drainage
problem

caused
by
undersized
pipes
in
poor
condi3on.
The
lack
of
capacity
causes
two
state
arterials
to
be
 










1,000,000
 5
Hoffman
Estates IL Water Jones/Highland
Stormwater
Improvement
Descrip3on:
Construc3on
of
a
48
inch
diameter
storm
sewer
to
correct
a
long‐standing
drainage
problem

shared
between
three
agencies.
Two
collector
roads
in
Hoffman
Estates
are
under
water
for
days
aber
a
heavy
ra 










1,200,000
 5
Hoffman
Estates IL Water Rehabilita3on
and
Reconstruc3on
of
the
Barrington
Square
Sanitary
Lib
Sta3on
Descrip3on:
The
Lib
Sta3on
shows
serious
corrosion
of
the
piping,
valves,
pumps,
wet
well
and
dry
well
structures.
The
rehabilita3on
project
includes
the
conversion
of
 










1,000,000
 5
Hoffman
Estates IL Water Replace
6,800
feet
of
Failing
Water
Main
Descrip3on:
Project
is
to
replace
approximately
6,400
feet
of
failing
16
inch
water
transmission
main
on
Ela
Road
star3ng
at
its
intersec3on
with
Central
Road
and
ending
at
its
intersec3on
with
Algonquin
Road 










1,300,000
 7
Hoffman
Estates IL Water Sanitary
Sewer
Rehabilita3on
Program
Descrip3on:
This
mul3phase
project
has
been
in
progress
for
over
8
years
in
Parcel
A,
Parcel
B,
Parcel
C
and
the
Highland
areas.
Phase
I
included
engineering
studies
to
inves3gate
pipe
deficiencies
and
to
define
 










1,400,000
 7
Hoffman
Estates IL Water Water
Tower
Project
Descrip3on:
It
has
been
determined
through
Western
Area
water
system
studies
that
a
second
water
tower
is
needed
in
the
this
por3on
of
the
Village.
A
second
water
storage
tank
is
necessary
to
correct
insufficient

storage
capacity
 










4,600,000
 12
Homer
Glen IL Streets/Roads Sidewalk
Replacement 












250,000
 10
Homer
Glen IL Streets/Roads Local
Road
Flood
Control 












150,000
 25
Homer
Glen IL Streets/Roads Road
Connec3vity 












400,000
 25
Homer
Glen IL Streets/Roads Street
Resurfacing 










1,200,000
 40
Homer
Glen IL Water Sewer
Lining
‐
Various 












500,000
 20
Homer
Glen IL Water Fiddyment
Creek
Sanitary
Sewer 










5,400,000
 500
Homewood IL Water Water
and
Sewer
Infrastructure
Rehabilita3on:
Baxter
&
Woodman
Engineering
is
finalizing
their
preliminary
 








22,000,000
 100
Kangley IL CDBG Construc3on
of
new
storm
water
drainage. 












135,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
Kinsman IL CDBG Street
improvements 












150,000
 3
Lansing IL Airport Lansing
Municipal
Airport
‐
Relocate
overhead
u3li3es
undgerground
on
Glenwood‐Lansing
Road
from

Burnham
Avenue
to
the
IL/IN
State
Line
in
order
to
increase
sight
distance
and
create
a
clear
runway

protec3on
zone. 












750,000
 20
Lansing IL CDBG Street
Ligh3ng
Upgrades 












650,000
 17
Lansing IL Streets/Roads Street
Resurfacing 










2,850,000
 70
Lansing IL Streets/Roads Sanitary
Sewer
Lining
 










6,000,000
 150
Lansing IL Water Interior
and
exterior
pain3ng
of
Chicago
Ave
water
tank 












527,000
 14
Lansing IL Water Interior
and
exterior
pain3ng
of
170th
St
water
tank 












562,000
 15
Lansing IL Water Structural
Repairs
to
Water
Reservoirs 












878,000
 23
LaSalle IL CDBG Bath
House
Window
Replacement 














25,000
 5
LaSalle IL CDBG Park
Ligh3ng
Replacement 














90,000
 6
LaSalle IL CDBG Bath
House
Parking
Lot
Reconstruc3on 












200,000
 10
LaSalle IL Streets/Roads Street
Sign
Replacement
Project 












400,000
 10
LaSalle IL Streets/Roads Sidewalk
Replacement
&
ADA
Ramp
Construc3on 










1,000,000
 20
LaSalle IL Streets/Roads Gunia
Drive
Reconstruc3on 












450,000
 30
LaSalle IL Streets/Roads Sterling
Street
Reconstruc3on 












250,000
 30
LaSalle IL Streets/Roads 2009
Street
Overlays 










3,000,000
 40
LaSalle IL Water Large
Water
Meter
Replacement
Project 














20,000
 3
LaSalle IL Water Wellfield
VFD
Installa3on 












200,000
 6
LaSalle IL Water Backup
Generator
Installa3ons 












100,000
 10
LaSalle IL Water Campbell
Sanitary
Sewer
Replacement 














50,000
 10
LaSalle IL Water Civic
Elevated
Water
Tank
Pain3ng 












750,000
 10
LaSalle IL Water Illinois
Cement
Water
Main
Extension 












150,000
 10
LaSalle IL Water North
System
Water
Transmission
Line 










1,500,000
 14
LaSalle IL Water Replace
Aera3on
Bay
Walkways 












200,000
 15
LaSalle IL Water Route
6
Water
Main
Extension 












100,000
 15
LaSalle IL Water TIF
III
Sanitary
Sewer
Extension 










1,000,000
 20
LaSalle IL Water East
End
Wastewater
Treatment
Plant 










9,500,000
 100
Leland IL CDBG Construc3on
storm
sewer
in
northeast
sec3on
of
community. 












500,000
 14
Lombard IL CDBG PW
Emergency
Response
Vehicle 














60,000
 3
Lombard IL CDBG Sewer
Lining
Program 












500,000
 4
Lombard IL CDBG Civic
Center
Reservoir
Pump
Rehabilita3on 












300,000
 6
Lombard IL CDBG GIS
Upgrades 












350,000
 6
Lombard IL CDBG Old
Towne
Lib
Sta3on
Pump
Upgrade 












325,000
 6
Lombard IL CDBG Village
Hall
Public
Restroom
Remodel(s) 














41,000
 6
Lombard IL CDBG Fire
Sta3on
#2
Storage
Building/Garage 














60,000
 8
Lombard IL CDBG Great
Western
Trail
Ligh3ng
Project 










1,000,000
 12
Lombard IL CDBG General
Local
Street
Resurfacing 










2,000,000
 15
Lombard IL CDBG Village
Hall
Parking
Lot
Expansion 












300,000
 22
Lombard IL CDBG Construc3on
of
Salt
Dome 










1,100,000
 30
Lombard IL CDBG Traffic
Signal
&
Intersec3on
Improvements
(Madison/SR
53) 










4,100,000
 30
Lombard IL CDBG Wells
Corridor
Infrastructure 










1,100,000
 40
Lombard IL CDBG Construc3on
of
a
Public
Works
Facility 








13,000,000
 120
Lombard IL CDBG YMCA
Construc3on 










4,000,000
 120
Lostant IL Water Construct
new
water
mains
to
replace
deteriorated
and
undersized
mains.This
will
provide
for
befer
fire
 












225,000
 6
Lostant IL Water Construct
new
deep
water
well
to
meet
IEPA
requirements
for
well
capacity
for
source
water
to
residents.

The
 












685,000
 18
Lynwood IL Streets/Roads Lake
Lynwood
area
resurfacing 












325,000
 12
Lynwood IL Streets/Roads Lynwood
Terrace
area
resurfacing 












350,000
 12
Lynwood IL Water Water
valve
exercise
&
leak
detec3on
program 














75,000
 3
Lynwood IL Water Glenwood‐Dyer
water
loop
‐
King
Arthur
to
2449
Glenwood‐Dyer 












100,000
 4
Lynwood IL Water Replacement
of
Lake
Lynwood
water
main
crossing 












100,000
 4
Lynwood IL Water Torrence
water
loop
‐
Bilstone
to
Glenwood‐Dyer 












150,000
 4
Lynwood IL Water Torrence
water
loop
‐
Nichols
to
~199th
St. 












150,000
 4
Lynwood IL Water Elevated
tanks
1
&2
renova3ons 












150,000
 5
Lynwood IL Water Reten3on
expansion
for
Sonstead
Farms
&
Haven
Estates
areas 












150,000
 6
Lynwood IL Water Village
wide
sanitary
sewer
manhole
rehabili3ons
program 












250,000
 8
Lynwood IL Water Glenwood‐Dyer
water
loop
‐
Rt
30
to
Dyer 












400,000
 10
Lynwood IL Water Glenwood‐Dyer
water
loop
Camelot
to
Stony 












325,000
 10
Lynwood IL Water Flood
relief
sewer
for
Sonstead
Farms
&
Haven
Estates
areas 












350,000
 12
Lynwood IL Water Glenwood‐Dyer
sanitary
sewer
extension 












950,000
 16
Lynwood IL Water West
side
water
storage 










2,000,000
 18
Manhafan IL CDBG Manhafan
Rd
Sidewalk
Extension 












150,000
 10
Manhafan IL Water Water
Tower
Demoli3on 














85,000
 2
Manhafan IL Water Downtown
Manhole
Repairs 












150,000
 10
Manhafan IL Water Downtown
Sewer
Lining 












750,000
 30
Manhafan IL Water Well
#6
Upgrade
&
Radium
Removal
Facility 










4,000,000
 130
Manlius IL Water Construct
new
wastewater
collec3on
and
treatment
system
in
a
presently
unsewered
community. 










3,800,000
 106
Mark IL CDBG Widen,
remove,
and
replace
pavement
structure,
construct
new
sewers
and
curb,
and
gufers

on
Hennepin
 










1,100,000
 31
Mark IL Water Construc3on
of
new
water
well
and
replacement
of
undersized
deteriora3ng
mains. 












275,000
 10
Marseilles IL CDBG I
&
M
Canal
drainage
improvements
to
control
stormwater
overflows
that
seriously
affect
a
major
(75
jobs)

local
industrial
employer.
The
Company
will
expand
(20
more
jobs)
provided
the
City
eliminate
the
floodind

problem. 












850,000
 18
Marseilles IL CDBG Extend
water,
sanitary
sewer
and
an
access
road
to
serve
an
available
vacant
prime
150
Acre
industrial
site

bordered
by
the
CSX
Railroad
&
the
Illinois
River
with
barge
access.
(Kelly
Property) 










1,600,000
 20
Marseilles IL Streets/Roads Sidewalk
construc3on
‐
Along
County
Highway
15
from
Bluff
Street
to
11
th
Street
to
provide
walking
access

from
the
main
business
district
to
a
developing
business
area. 












200,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Marseilles IL Streets/Roads Lincoln
Street
‐
Aurora
to
Chicago
&
Chicago
‐
Lincoln
to
Bluff
St.
remove
&
replace
curbs,
resur.face,
storm

drainage
improvements,
and
rail
crossing
approach
improvements. 












900,000
 16
Marseilles IL Streets/Roads Best
Street
then
Pomeroy,
Bond,
Armstrong
&
Sample
Street
Improvements
‐also
Fillebrown
Street
‐

Reconstruct
streets
by
building
a
completely
new
base
adding
curb
&
gufers,
storm
sewers,
sidewalks
and
 










1,950,000
 20
Marseilles IL Streets/Roads Stromwater
deten3on
basins
‐
Construct
deten3on
basins
in
four
loca3on
to
eliminate
flooding
in
the
lower

areas
of
town.
In
storms,
water
from
the
bluffs
flow
into
the
valley
areas
causing
widespread
flooding
ofg
 














80,000
 20
Marseilles IL Water Illinois
River
South
Plant
‐
Upgrade
and
replace
the
aerators
in
the
sewage
treatment
lagoon
and
replace
the

main
STP
lib
sta3on. 












600,000
 8
Marseilles IL Water Grant
Street
‐
Lincoln
to
Washington
Street.
Replace
the
sanitary
sewer
under
the
CSX
railroad
to
eliminate
the

restric3on
that
causes
sewer
backups
to
several
hundred
homes. 












380,000
 10
Marseilles IL Water Radium
Removal
from
drinking
water
&
adding
emergency
generators
to
three
exis3ng
wellhouses
for
system

north
of
the
Illinois
River.
Project
has
been
issued
an
IEPA
construc3on
permit. 










2,200,000
 15
Marseilles IL Water Young
Street
‐
Replace
the
sanitary
sewer
from
Young
Street
to
Commercial
street
just
west
of
the
swimming

pool.
The
sewer
is

located
under
a
creek
and
has
serious
alignment
and
leakage
problems.
800
+/‐
lineal
feet

of
30"
sanitary
sewer.
 












410,000
 15
Marseilles IL Water Wallace
Street
‐
Replace
the
sanitary
sewer
from
Aurora
Street
to
Liberty
street.
The
sewer
is
made
of
"buf"

joint
clay
3le
and
is
a
major
source
of
infiltra3on
into
the
sewer
system.
The
sewer
is
located
undr
the
street

and
the
replacement
will
also
r 












760,000
 18
Marseilles IL Water Water
and
Sanitary
Sewer
extension
from
11th
Street
north
2
miles
to
Interstate
80
including
a
lib
sta3on
and

related
work.
Provides
water
&
sewer
facili3es
to
a
500
acre
development
area
at
the
Interstate
80
exit
at

Marseilles

 










2,800,000
 18
Marseilles IL Water Ilinois
River
South
water
system.
Dtrill
a
new
well
as
required
by
the
IEPA
and
add
radium
removal
facili3es
to

the
exis3ng
south
system
(includes
several
watermain
extensions. 










2,600,000
 20
Mafeson IL Streets/Roads Cicero/Mafeson
Intersec3on
improvement. 










2,000,000
 10
Mafeson IL Streets/Roads Cicero/Vollmer
Intersec3on
reconstruc3on
upgrade
per
IDOT
standards. 










2,500,000
 10
Mafeson IL Streets/Roads Mafeson
Avenue
Bridge
comple3on.
Construc3on
of
roadway
bridge
to
improve
emergency
service
access. 












250,000
 20
Mafeson IL Water Construc3on
of
a
new
Elevated
Water
Tower
to
meet
needs
of
a
growing
popula3on. 










2,000,000
 7
Mafeson IL Water Elevate
Exis3ng
Water
Tower
to
establist
hydraulic
equilibrium
with
another
exis3ng
tower
to
make
water

delivery
more
efficient. 










1,250,000
 7
Mazon IL CDBG Sanitary
sewer
improvements 












200,000
 6
Mazon IL CDBG Street
improvements 












350,000
 10
Mazon IL CDBG Replacement
of
old,
undersized
and
deteriora3ng
watermains. 












480,000
 14
Mazon IL CDBG Storm
sewer
improvements 












650,000
 18
McNabb IL CDBG Construc3on
of
a
new
wastewater
treatment
and
collec3on
system
for
a
community
that
has
no
central
 










1,220,000
 34
McNabb IL Water Construct
new
shallow
water
supply
well
and
connect
to
the
treatment
plant.

Furnish
standby
power
to
supply
 












375,000
 11
Mineral IL Water Construc3on
of
new
wastewater
treatment
and
collec3on
system
for
community
that
has
no
central
sanitary

system 










2,800,000
 78
Moline IL Amtrak Train
Car
Rehabilita3on 










5,600,000
 10
Moline IL Amtrak Amtrak
plazorm 












550,000
 35
Moline IL Amtrak Track
Upgrades
between
Chicago
and
Moline 








22,700,000
 50
Moline IL Amtrak Amtrak
Depot 












800,000
 55
Moline IL Amtrak Relocate
siding
to
Silvis 










2,300,000
 65
Moline IL CDBG CDC
Administra3ve/Startup
Funds 












100,000
 2
Moline IL CDBG Riverfront
High
Speed
Network 












750,000
 5
Moline IL CDBG CDC
Revolving
Construc3on
Loan
Fund
Capitaliza3on 










3,000,000
 30
Moline IL CDBG 5th
Avenue
Reconstruc3on/Streetscaping 










6,000,000
 50
Moline IL CDBG Housing
Rehabilita3on
Funds 










1,000,000
 50
Moline IL CDBG Public
Safety
Sta3on
for
South
of
the
Rock
River 










8,000,000
 50
Moline IL CDBG Collector
Road
System
Resurfacing 








30,000,000
 210
Moline IL Energy Replace
roof
City
Hall 












195,000
 10
Moline IL Energy Revolving
EECBG
Loan
Fund
for
Private
Building
Retrofits 










1,000,000
 20
Moline IL Energy Retrofit
City
Buildings
for
LEED/Energy
Efficiency 










5,000,000
 100
Moline IL Public
Safety Pheasant
Ridge
Apts
COP
officer 














58,000
 1
Moline IL Public
Safety Spring
Brook
Cts
COP
officer 














58,000
 1
Moline IL Public
Safety Valley
View
COP
officer 














58,000
 1
Moline IL Public
Safety Middle
&
High
School
officers 












180,000
 3
Moline IL Public
Safety Police
Officers 












540,000
 9
Moline IL Public
Safety Crossing
Guards 














30,000
 10
Moline IL Public
Safety Police
and
Fire
employees
to
man
sta3on
south
of
Rock
River 












600,000
 10
Moline IL Schools Allendale
Retaining
Wall
Repairs
‐
A
historically
significant
retaining
wall,
built
in
1906,
bordering
a
historic
 












100,000
 5
Moline IL Schools H.S.
Electrical
Switchgear
Replacement
‐
This
work
replaces
cri3cal
electrical
switchgear
on
the
main
electrical
 












360,000
 8
Moline IL Schools H.S./Cool
Tennis
Court
Improvements
‐
Providing
proper
maintenance
of
surfaces
for
these
P.E.
and
athle3c

areas
is
a
challenge
in
our
colder
climate.

These
surfaces
require
repair
and
resurfacing
to
keep
them
safe
for

students. 












150,000
 10
Moline IL Schools Browning
Field
Ligh3ng
‐
The
field
ligh3ng
is
inadequate,
at
least
40
years
old
and
in
poor
condi3on.

This

athle3c
field
hosts
football
games,
track
and
field
events
and
soccer
games
for
boys
and
girls
athle3cs. 












250,000
 12
Moline IL Schools Browning
Field
West
Entrance
Improvements
‐
In
coopera3on
with
the
City
of
Moline
and
Park
Board,
an
effort

exists
to
provide
an
improved
community
park
area
which
adjoins
the
School
District's
Browning
Field

Complex.

 












100,000
 14
Moline IL Schools Browning
Field
Restrooms
and
Concession
Stands
‐
Currently
the
restrooms
and
concessions
at
Browning
Field

are
inadequate
for
the
number
of
patrons
using
the
facility
and
offer
very
limited
and
poor
quality

handicapped
facili3es. 












460,000
 15
Moline IL Schools H.S.
Soccor
Field
Ligh3ng,
restrooms,
bleachers,
etc.
‐
Compe33on
facili3es
are
at
a
premium
and
scheduling

conflicts
oben
occur.

The
addi3on
of
these
facili3es
will
improve
access
for
our
2200
H.S.
students. 












400,000
 35
Moline IL Schools Throughout,
Security
Equipment
Installa3ons
‐
The
District
recently
had
a
crises
management
plan
developed

and
an
audit
of
our
exis3ng
facili3es
completed.

Recommenda3ons
included
installing
access
control
and

monitoring
equipment
to
enhance
student
 












850,000
 35
City State Program Project
Descrip3on Funding
Required Jobs
Moline IL Schools Throughout,
21st
Century
Classrooms
‐
In
an
effort
to
comply
with
ini3a3ves
consistent
with
developing
21st

century
classrooms
throughout
the
District,
technology
enhancements
are
required
in
all
District
facili3es.
 










2,050,000
 45
Moline IL Schools Indoor
Air
Quality
and
Classroom
Environment
Retros
‐
Improvements
included
here
will
provide
for
befer

educa3onal
environments
for
all
of
our
at
risk
preschool
and
high
school
students
as
well
as
the
en3re

popula3on
of
one
elementary
school
building. 












835,000
 50
Moline IL Schools Moline
High
School
Hea3ng
&
Cooling
Upgrades
‐
Update
original
1950's
boiler
systems
and
add
geothermal

hea3ng
&
air
condi3oning
to
provide
proper
learning
environment
for
2,400
students. 








19,000,000
 50
Moline IL Schools Browning
Field
Visitor
Bleachers
and
Locker
Facili3es
‐
Visitor
bleachers
are
in
excess
of
30
years
old,
are

inadequate,
are
not
handicapped
accessible
and
do
not
meet
current
safety
codes. 










5,000,000
 75
Moline IL Schools Moline
High
School
Community
Center
‐
Build
a
new
Community
Center
to
include
3
compe33on
size
gyms,

weight
room
facility,
an
indoor
running
track
and
Olympic
size
swimming
pool. 










8,700,000
 100
Moline IL Schools John
Deere
Middle
School
Addi3on
‐
Add
on
to
exis3ng
middle
school
to
enlarge
capacity
to
include
6th

graders
(currently
only
housees
7th
&
8th
grades).

Would
allow
for
exis3ng
elementary
buildings
to
free
up

classroom
space
to
lower
class
size
 








33,000,000
 300
Moline IL Schools Wilson
Middle
School
Addi3on
‐
Add
on
to
exis3ng
middle
school
to
enlarge
capacity
to
include
6th
graders

(currently
only
houses
7th
&
8th
grades).

Would
allow
for
exis3ng
elementary
buildings
to
free
up
classroom

space
to
low
class
size 








24,000,000
 300
Moline IL Streets/Roads River
to
River
Mul3‐Use
Trail
Construc3on














800,000
 20
Moline IL Streets/Roads Valley
View
Village
(42nd
Ave
and70th
St.
extensions) 










1,000,000
 45
Moline IL Streets/Roads Rock
River
Boulevard 










9,555,000
 100
Moline IL Streets/Roads John
Deere
Rd
rebuild 






200,000,000
 250
Moline IL Streets/Roads I
‐74
Bridge
replacement 






950,000,000
 400
Moline IL Transit Buses
for
Metro 










5,200,000
 25
Moline IL Transit Centre
Sta3on
Enhancement
for
Rail 










1,500,000
 30
Moline IL Transit 19th
st
pedestrian
corridor 










2,300,000
 75
Moline IL Water Wastewater
Repairs/Improvements 










3,000,000
 20
Moline IL Water Water
Main
Loops
to
Eliminate
Dead
End
Lines 










3,000,000
 20
Moline IL Water Rpl
storm
in
1st
St 












300,000
 30
Moline IL Water Rpl
sewer
main
in
5th
Ave 












400,000
 40
Moline IL Water Rpl
water
main
in
5th
av 












400,000
 40
Moline IL Water Valley
View
Village
(sewer
and
water
extensions) 










3,300,000
 50
Moline IL Water Water
Tower
and
Main
Network
South
of
Airport 










5,000,000
 100
Moline IL Water Main
upgrades
&
Replacement 








10,200,000
 140
Morris IL Airport Expansion
of
runway
to
the
north
and
purchase
of
property. 










2,000,000
 56
Morris IL CDBG Remove
and
replace
bridge
deck
to
address
serious
deficiencies
in
Shaky
Bridge
over
west
fork
of
Nefle
Creek 












750,000
 21
Morris IL CDBG Sanitary
sewer
extension 










1,000,000
 28
Morris IL CDBG Street
repairs 










1,000,000
 28
Morris IL CDBG Water
treatment
system
improvements 










1,000,000
 28
Morris IL CDBG Industrial
Development
Enhancement
to
extend
municipal
water
and
construct
truck
access
route
for
 










3,000,000
 84
Naplate IL Water Construct
new
water
treatment
plant
to
reduce
the
radium
level
to
within
acceptable
standards
in
the
Village's
 










1,000,000
 28
Neponset IL Water Construct
new
water
treatment
plant
well
for
the
purpose
of
removing
elevated
levels
of
radium
from
the

water
supply. 










1,120,000
 31
Niles IL CDBG Retrofit
Efficient
Ligh3ng 










2,000,000
 14
Niles IL CDBG New
Fire
Sta3ons
(2) 








14,000,000
 91
Niles IL Energy Retrofit
Energy
Efficient
Ligh3ng 










3,000,000
 21
Niles IL Housing Rehab
Local
Affordable
Housing 










5,000,000

Niles IL Public
Safety First
Responder
Training 










5,000,000
 35
Niles IL Streets/Roads Bus
Rapid
Transit
(dedicated
lanes
and
signaliza3on) 










3,000,000
 21
Niles IL Streets/Roads Corridor
Ligh3ng
Improvement.

the
Village
of
Niles
proposes
the
pain3ng
of
108
street
light
poles
from
 














76,000
 4
Niles IL Streets/Roads Crosswalk
at
Jerry's
Fruit
Market
Intersec3on
Improvement.

The
Village
of
Niles
proposes
to
improve
this
 














25,000
 6
Niles IL Streets/Roads Greendale
Avenue
Resurfacing.

The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,

which
will
include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is
Greendale
Avenue

from
Prospect
Street
to
Oakton
Street. 












100,000
 12
Niles IL Streets/Roads Oak
Lane
Resurfacing.

The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
which
will

include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is:Oak
Lane
from
Prospect
Street

to
West
End.

 














50,000
 12
Niles IL Streets/Roads Prospect
Court
Resurfacing.The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
which
will

include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is:Prospect
Court
from
Prospect

Street
to
East
End.

 














50,000
 12
Niles IL Streets/Roads Prospect
Street
Resurfacing.

The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
which

will
include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is:
Prospect
Street
from

Oakton
Street
to
Greendale
Avenue. 












130,000
 12
Niles IL Streets/Roads Courtland
Drive
Resurfacing.
The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
which

will
include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is:
Courtland
Drive
from

Church
Street
to
Lyons
Street.

 












230,000
 15
Niles IL Streets/Roads Riverside/Days
Alley
Reconstruc3on.

The
Village
of
Niles
proposes
to
reconstruct
the
alley
between
Riverside

Drive
and
Days
Terrace.

This
is
a
distance
of
approximately
275
feet.

The
subject
alley
has
deteriorated
and
in

need
of
reconstruc3on. 














70,000
 15
Niles IL Streets/Roads Chesterfield
Area
Resurfacing.

The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
streets,
which

will
include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
streets
are:
Main
Street
from

Shermer
Road
to
Waukegan
Roa 












853,000
 25
Niles IL Streets/Roads Milwaukee
Avenue
and
Harlem
Avenue
Intersec3on
Improvement.

The
Village
of
Niles
proposes
to
improve

this
major
intersec3on
with
pedestrian
safety
features
such
as
Pedestrian
Countdowns,
brick
banding
and

pathways,
as
well
as
Traffic
Signal
Moderniza3 












550,000
 25
Niles IL Streets/Roads Milwaukee
Avenue
and
Howard
Avenue
Intersec3on
Improvement.

The
Village
of
Niles
proposes
to
improve

this
major
intersec3on
with
pedestrian
safety
features
such
as
Pedestrian
Countdowns,
brick
banding
and

pathways,
as
well
as
Traffic
Signal
Moderniza3on 












495,000
 25
City State Program Project
Descrip3on Funding
Required Jobs
Niles IL Streets/Roads Milwaukee
Avenue
&
Ballard
Road
Intersec3on
Improvement.

To
improve
traffic
flow
at
the
above
referenced
intersec3on,
one
lane
is
proposed
to
be
added
to
the
east

approach
of
Ballard
Road,
tapering
back
to
the
current
two‐lane
pavement
 












750,000
 30
Niles IL Streets/Roads Milwaukee
Avenue
and
Oakton
Street
Intersec3on
Improvement.

The
Village
of
Niles
proposes
to
improve
this

major
intersec3on
with
pedestrian
safety
features
such
as
Pedestrian
Countdowns,
brick
banding
and

pathways,
as
well
as
Traffic
Signal
Moderniza3 












830,000
 30
Niles IL Streets/Roads Touhy
Avenue
Watermain
Replacement
Project.
The
Village
of
Niles
proposes
to
install
a
new
watermain
as

follows:
Touhy
Avenue
from
Harlem
Avenue
to
Caldwell
Avenue.

This
is
a
distance
of
approximately
5,000
feet.












2,300,000
 30
Niles IL Transit Bus
Rapid
Transit
(Dedicated
lanes
and
signaliza3on) 










5,000,000
 35
Niles IL Water Stormwater
‐
Flood
Mi3ga3on










15,000,000
 95
Niles IL Water Niles
Water
System
Safety
Project.

The
Village
of
Niles
proposes
the
implementa3on
of
a
Niles
Water
System

Security
Plan
that
includes
the
installa3on
of
new
locks,
perimeter
barriers,
alarms,
mo3on
detectors
and

closed
circuit
television
cameras
at
a 














52,000
 8
Niles IL Water Milwaukee
Avenue
Watermain
Replacement
The
Village
of
Niles
proposes
to
replace
the
10‐inch
watermain
in
Milwaukee
Avenue
with
a
12‐inch
main
from

the
transmission
main
at
Waukegan
Road
to
the
12‐inch
loop
on
Albion
Avenue 










1,500,000
 15
Niles IL Water Oakton
Street
Area
Watermain
Improvement
Project.

The
Village
of
Niles
proposes
to
install
a
new
watermain

along
the
following
route:

•
Oakton
Street
from
Waukegan
Road
east
to
the
Village
limits.


•
Caldwell
Avenue
from
Seward
Street
to
Main
Street; 










1,200,000
 30
Normal IL Energy Solar
Installa3on
at
the
Children's
Discovery
Museum
‐‐
This
includes
installing
solar
panels
on
the
roof
of
the

Town's
children's
museum.
The
panels
would
generate
power
for
the
facility
and
also
serve
as
an
educa3onal

tool
for
the
community. 














75,000
 5
Normal IL Energy Dayligh3ng
upgrades
at
maintenance
facili3es
‐‐
This
would
include
installing
advanced
dayligh3ng
at
the

Town's
various
maintenance
buildings.

The
lights
would
eliminate
the
need
for
tradi3onal
electricity
during

day
light
hours. 














60,000
 10
Normal IL Energy Solar
Installa3on
at
the
Community
Ac3vity
Center
‐‐
This
includes
installing
solar
panels
at
Normal's

community
center.

The
panels
would
generate
a
significant
amount
of
power
for
the
building
and
also
be
a

showcase
in
the
community. 












130,000
 10
Normal IL Energy The
Underwood
House
‐
Green
Park
Facility
to
demonstrate
solar,
wind,
geothermal,
and
storm
water

treatment.
Facility
for
Con3nuing
Educa3on
and
loca3on
of
the
Ecology
Ac3on
Center 










1,000,000
 35
Normal IL Public
Safety Addi3onal
Patrol
Vehicle
‐‐
An
addi3onal
vehicle
is
needed
to
supplement
the
exis3ng
marked
police
fleet. 














31,000
 0
Normal IL Public
Safety Airsob
Training
Weapons
Packages
‐‐
These
weapons
assist
officers
during
rapid
deployment
training,
scenario

based
training,
and
emergency
response
training.
The
package
includes
pistols,
magazines,
charging
sta3ons,

masks
and

storage
cases. 















6,000
 0
Normal IL Public
Safety Alternate
Light
Source
‐‐
An
alternate
light
source
is
needed
to
assist
officers
at
crime
scenes
aber
dark. 















5,000
 0
Normal IL Public
Safety COPS
Hiring
Grants
‐‐
Funds
are
needed
for
three
officers
to
be
added
to
the
Normal
Police
Department.
The

number
provided
includes
one
year's
salary
and
equipment. 












200,000
 3
Normal IL Streets/Roads Parkside
Road
Improvement
‐‐
This
project
includes
reconstruc3ng
a
heavily
traveled
roadway
in
Normal. 












300,000
 15
Normal IL Streets/Roads Towanda
Road
Improvement
‐‐
This
includes
widening
and
improving
an
exis3ng
2
lane
road
into
a
4
lane
road

to
accomodate
increased
traffic
flows. 












525,000
 20
Normal IL Streets/Roads Vernon
Avenue
Bridge
Replacement
‐‐
Includes
reconstruc3on
of
a
heavily
traveled
bridge
in
Normal. 












700,000
 20
Normal IL Streets/Roads Willow
Street
Road
Improvement
‐‐
This
project
includes
the
reconstruc3on
of
a
heavily
traveled
roadway
in

Normal 












500,000
 20
Normal IL Streets/Roads Ft.
Jesse
Road
Improvement
‐‐

This
project
involves
reconstruc3ng
a
heavily
traveled
roadway
in
Normal. 












650,000
 25
Normal IL Transit Mul3modal
Center
will
provide
a
focus
for
eight
transporta3on
modes
including
(1)
the
city
bus
system,
(2)

inter‐city
and
charter
buses,
(3)
Amtrak
service
to
Chicago
and
St.
Louis,
(4)
airport
shufles,
(5)
taxis,
(6)
park

and
ride
facili3es,
(7)
and 








16,000,000
 350
Normal IL Water New
Raw
Water
Transmission
Main‐‐
This
project
consists
of
the
installa3on
of
a
new
sixteen
inch
raw
water
transmission
main
that
will
improve
transmission
capacity
as
well
as
replace
an
aging
water
main
that
is
in

ques3onable
condi3on. 












800,000
 15
Normal IL Water Water
Main
Replacement
(David,
Daisy
and
Julienne
Streets)
‐‐
This
project
includes
replacing
an
aging
water

main
on
the
above
listed
streets. 












425,000
 15
Normal IL Water Water
Main
Replacement
(Gregory
Street)
‐‐
This
project
includes
replacing
a
water
main
on
Gregory
Street

from
Main
Street
to
Adelaide
Street. 












750,000
 15
Normal IL Water Elevated
Tank
Pain3ng
‐‐
This
project
includes
the
repain3ng
of
3
elevated
tanks
to
comply
with
federal

regula3ons. 










2,000,000
 25
Normal IL Water Northeast
Trunk
Sanitary
Sewer
Extension
‐‐
This
project
consists
of
the
extension
of
the
trunk
sanitary
sewer
from
the
Airport
Road
pump
sta3on
east
along
Northtown
Road
and
south
along
the
Weber
property.

The
sewer
extension
will
serve
the
areas
south 










2,500,000
 30
North
Chicago IL CDBG Brownfields
Cleanup
‐
Sheridan/Broadway
Gas
Sta3on
Site 












100,000
 10
North
Chicago IL CDBG Brownfields
Cleanup
‐
1901
Sheridan
(abandoned
factory
site) 












300,000
 20
North
Chicago IL CDBG Brownfields
Cleanup
‐
EMCO/Vacant
Lot 












300,000
 20
North
Chicago IL CDBG Brownfields
Cleanup
‐
Former
Landfill 












500,000
 30
North
Chicago IL CDBG Brownfields
Cleanup
‐
Sheridan
Crossing 












500,000
 30
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Administra3on 














16,000
 2
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Management
Improvements 















5,000
 2
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Miscellaneous
Equipment 















7,000
 2
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Security
Cameras
and
Guards 














10,000
 2
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Dwelling
Equipment 














10,000
 3
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Replace
Power
Rodder 















2,000
 4
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Replace
Public
Flooring 














15,000
 4
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Paint
Hallways 














18,000
 5
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Replace
Carpet 














30,000
 6
City State Program Project
Descrip3on Funding
Required Jobs
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Replace
Garage
Doors 














20,000
 6
North
Chicago IL Housing Demoli3on
of
Blighted
Structures 












120,000
 10
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Replace
Vanity
and
Medicine
Cabinets 














40,000
 10
North
Chicago IL Housing Public
Housing
‐
Kukla
Towers
‐
Renovate
Community
Rms. 














30,000
 15
North
Chicago IL Public
Safety In
Squad
Dash
Cameras 














42,000
 5
North
Chicago IL Public
Safety Warning
Sirens 












100,000
 5
North
Chicago IL Streets/Roads 24th
Street
Street
Light
Installa3on 














10,000
 4
North
Chicago IL Streets/Roads Detector
Loop
Repairs 














25,000
 5
North
Chicago IL Streets/Roads Electronic
Pre‐Emp3on
Device
Repairs 














14,000
 5
North
Chicago IL Streets/Roads 2009
Thermoplas3c
striping 














25,000
 10
North
Chicago IL Streets/Roads Broadway
Avenue
Sidewalk 












100,000
 10
North
Chicago IL Streets/Roads Buckley/Amstutz
Underpass
Street
Light
Installa3on 














10,000
 10
North
Chicago IL Streets/Roads Lakeside
Avenue
Phase
I
Design 












115,000
 10
North
Chicago IL Streets/Roads Infrastructure
Maintenance
System 














50,000
 15
North
Chicago IL Streets/Roads Bike
Path
Extension
(Commonwealth
to
Sheridan) 












100,000
 20
North
Chicago IL Streets/Roads 2009
Resurfacing
Project 












475,000
 30
North
Chicago IL Streets/Roads Wallace
Avenue
Watermain/Roadway
Construc3on
and
Inspec3on 










1,334,000
 40
North
Chicago IL Water Mar3n
Luther
King
Dr
Sewer
&
Watermain
Construc3on
Inspec3on 












352,700
 5
North
Chicago IL Water Wadsworth
Ave
Sewer
In
Situ
Form
Lining 














50,000
 5
North
Chicago IL Water Sheridan
Crossing
Stormwater
Deten3on
15.3
acre‐feet 










2,300,000
 15
North
Chicago IL Water Booster
Sta3on
Improvements 












150,000
 20
North
Chicago IL Water Miscellaneous
Sewer
In
Situ
Form
Linings 












400,000
 20
North
Chicago IL Water Lewis/Buckley
12"
Watermain
Construc3on
and
Inspec3on 










1,750,000
 30
North
Chicago IL Water Mar3n
Luther
King
Dr.
Sewer
&
Watermain
Construc3on 










3,300,000
 30
North
U3ca IL CDBG Clark
Run
Creek
Flood
Control
Project 










1,500,000
 42
North
U3ca IL CDBG Wastewater
treatment
plant
expansion 










1,750,000
 49
North
U3ca IL CDBG Radium
removal
plant
for
the
Village
water
system 










1,950,000
 55
North
U3ca IL Streets/Roads Construc3on
of
new
roadway
through
N.
U3ca
to
eliminate
2
sharp
90‐degree
turns
on
very
busy
truck
route.

 










7,500,000
 210
Northbrook IL CDBG Cedar
Lane
Ouzall
Improvements 












120,000
 5
Northbrook IL CDBG Elm
Ridge
Culvert
Replacement 












850,000
 5
Northbrook IL CDBG Public
Works
Center
‐
Storage
Fence
Replacement 














70,000
 5
Northbrook IL CDBG Water
Plant
‐
Generator
Replacements 












850,000
 5
Northbrook IL CDBG Williamsburg
Square
Subdivision
Ouzall
Replacement 












150,000
 5
Northbrook IL CDBG Midway/Whizield
Intersec3on
Flood
Reduc3on
Improvements 












600,000
 10
Northbrook IL CDBG Public
Works
Center
‐
East
Wing
Pain3ng 












100,000
 10
Northbrook IL CDBG Sanitary
Sewer
Force
Main
Replacement 












400,000
 10
Northbrook IL CDBG Sanitary
Sewer
Lining 












750,000
 10
Northbrook IL CDBG Storm
Sewer
Lining 












500,000
 10
Northbrook IL CDBG Techny
Drain
South
Fork
Relief
Sewer
Construc3on 










1,000,000
 10
Northbrook IL CDBG Water
Plant
‐
Roof
Replacement 












600,000
 10
Northbrook IL CDBG Dundee
Road
Bicycle
Facility
Construc3on
‐
Des
Plaines
River
Trail
to
Sanders
Road 












600,000
 15
Northbrook IL CDBG Lakefront
Pumping
Sta3on
‐
Ravine
Slope
Stabiliza3on 












145,000
 15
Northbrook IL CDBG Lakefront
Pumping
Sta3on‐
Driveway
Replacement 












185,000
 15
Northbrook IL CDBG Public
Works
Center
–
North
Driveway
Replacement 














50,000
 15
Northbrook IL CDBG Skokie
Valley
Trail
Construc3on‐

Lake‐Cook
Road
to
south
Village
limit 










1,200,000
 15
Northbrook IL CDBG Techny
Drain
Stormwater
Management
Improvements 










3,000,000
 15
Northbrook IL CDBG Water
Main
‐
Chronic
Breaker
Replacement 










3,600,000
 15
Northbrook IL CDBG Water
Plant
‐
Conversion
from
Chlorine
Gas
to
Sodium
Hypochlorite 












750,000
 15
Northbrook IL CDBG Water
Plant
Drive
Replacement 












250,000
 15
Northbrook IL CDBG Dundee
Road
Water
Main
Replacement
‐
Water
Plant
to
Waukegan
Road 










3,700,000
 20
Northbrook IL CDBG Dundee
Road
Water
Main
Replacement
‐
Waukegan
Road
to
Pfingsten
Road 










3,150,000
 20
Northbrook IL CDBG Water
Main
–
Construct
Interconnec3on
To
Deerfield
Distribu3on
System 










1,500,000
 20
Northbrook IL CDBG Water
Main
–
Construct
Interconnec3on
To
NWWC
Distribu3on
System 










3,150,000
 20
Northbrook IL CDBG Waukegan
Road
Bicycle
Facility
Construc3on
‐
Dundee
Road
(Illinois
Route
68)
to
just
north
of
Interstate
94
 












400,000
 20
Northbrook IL CDBG Asphalt
Street
Rehabilita3on 








13,000,000
 25
Northbrook IL CDBG Concrete
Pavement
Patching 










3,000,000
 25
Northbrook IL CDBG Water
Tower
Construc3on 










3,000,000
 25
Northbrook IL CDBG Western
Avenue
Trunk
Sewer
Construc3on 










1,700,000
 25
Northbrook IL CDBG Revere
Drive
Pavement
Reconstruc3on 










1,000,000
 30
Northbrook IL CDBG Fire
Sta3on
#11
Renova3on 










5,000,000
 45
Northbrook IL CDBG Overhead
Sanitary
Sewer
Conversion
Program 










4,000,000
 50
Oak
Brook IL Energy Replace
public
works
roof
with
a
green
alterna3ve 












290,419
 3
Oak
Brook IL Public
Safety Emergency
Siren
System
Upgrade 














53,800
 2
Oak
Brook IL Public
Safety Unified
Interoperable
Communica3ons
and
Alert/No3fica3on
System 












128,619
 3
Oak
Brook IL Public
Safety Add
3
new
full‐3me
officers,
3
community
services
officers,
1
CSO
supervisor 












425,000
 7
Oak
Brook IL Public
Safety Emergency
Opera3ons
Command
Center‐addi3on
to
library 










1,280,000
 7
Oak
Brook IL Streets/Roads Traffic
Cameras
to
allow
befer
traffic
flow
and
reduce
conges3on,
save
fuel 












200,000
 5
Oak
Brook IL Streets/Roads West
22nd
Street
Ligh3ng 










1,700,000
 10
Oak
Brook IL Streets/Roads Jorie
Road
Road
reconstruc3on 










1,300,000
 40
Oak
Brook IL Streets/Roads Miscellaneous
roadway
maintenance
projects 










1,700,000
 80
Oak
Brook IL Streets/Roads North
York/Harger
road
rebuilding 










5,200,000
 80
Oak
Brook IL Transit Purchases
busses
to
take

Oak
Brook
employees
from
nearby
train
sta3ons
to
Oak
Brook
to
reduce
traffic
 












300,000
 5
Oak
Brook IL Water 1‐88@22nd
St
Water
main
replacement 












655,000
 10
Oak
Brook IL Water 1‐88@rt.
83
Water
main
replacement 












272,000
 10
Oak
Brook IL Water 35th
St.
Watermain
project 












600,000
 10
Oak
Brook IL Water West
22nd
St.
watermain
replacement
project 










2,000,000
 15
Oak
Brook IL Water New
ground
storage
tanks 










5,105,000
 25
Oak
Park IL Streets/Roads Bicycle
Plan
Physical
Infrastructure
Improvements.

Project
area
is
village‐wide
and
would
be
executed
over
 












390,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Oak
Park IL Streets/Roads Green
Alleys.

Project
includes
two
alleys
being
replaced
consistent
with
City
of
Chicago
published
Green
Alleys
 












250,000
 20
Oak
Park IL Streets/Roads Harrison
Street
Ligh3ng.

Project
area
is
Harrison
Street
between
Aus3n
Boulevard
and
Elmwood
Avenue. 










1,000,000
 20
Oak
Park IL Streets/Roads Harrison
Street
Resurfacing.

Project
area
is
Harrison
Street
between
Aus3n
Boulevard
and
Elmwood
Avenue. 












250,000
 20
Oak
Park IL Streets/Roads East
Avenue
Resurfacing.

Project
area
is
between
Roosevelt
Road
and
Garfield
Street,
including
East
Avenue

and
Garfield
Street
intersec3on
replacement
and
Fire
Sta3on
driveway. 












600,000
 30
Oak
Park IL Streets/Roads Jackson
Boulevard
Resurfacing.

Project
area
is
between
Aus3n
Boulevard
and
Harlem
Avenue
(en3re
width
of

Village). 










1,300,000
 30
Oak
Park IL Streets/Roads South
Boulevard
and
Oak
Park
Avenue
Reconstruc3on.

Including
permanent
streetscape
elements. 










1,100,000
 40
Oak
Park IL Streets/Roads Harrison
Street
Streetscape.

Project
area
Harrison
Street
between
Aus3n
Boulevard
and
Elmwood
Avenue,

including
the
Harrison
Street
Arts
District.

Project
includes
sidewalks,
Lombard,
Aus3n
and
Ridgeland

intersec3ons,
alley
crossings,
curb
bump‐outs, 










4,400,000
 60
Oak
Park IL Streets/Roads Roosevelt
Road
Reconstruc3on.
Project
area
is
Roosevelt
Road
between
Harlem
and
Aus3n,
including

necessary
modifica3ons
and
reconstruc3on
in
an3cipa3on
of
increased
traffic
flow
resul3ng
from
major

reconstruc3on
of
I‐290.
 








14,000,000
 60
Oak
Park IL Streets/Roads North
Avenue
Reconstruc3on.

Including
permanent
streetscape
elements.

Project
area
is
between
Oak
Park

Avenue
and
Aus3n
Boulevard.
This
is
a
joint
project
with
the
City
of
Chicago.









11,000,000
 75
Oglesby IL CDBG Remove
and
replace
pavement
structure,
construct
new
storm
sewers
and
curb
and
gufer
on
Dale
Ave. 












350,000
 10
Oglesby IL CDBG Replace
small
diameter
and
deteriora3ng
cast
iron
and
transite
water
mains. 












400,000
 11
Oglesby IL Water Construc3on
of
water
tower
and
connec3ng
main
with
electrical
controls
etc.
to
address
lack
of
storage

capacity. 












753,000
 21
Oglesby IL Water Re‐construct
very
old/failing
treatment
plant
and
renovate
eight
deteriorated
and
hazardous
lib
sta3ons. 










2,306,000
 65
Olympia
Fields IL Public
Safety Olympia
Fields
Police
Squad
Car
Acquisi3ons 












120,000
 4
Olympia
Fields IL Public
Safety Olympia
Fields
Police
Technology
Upgrade 












120,000
 4
Olympia
Fields IL Public
Safety 203rd
Street
Video
Surveillance
Project‐Homeland
Security 












300,000
 10
Olympia
Fields IL Streets/Roads Handicap
Sidewalk
Ramp
Installa3ons
Various
Loca3on 












155,000
 5
Olympia
Fields IL Streets/Roads Olympia
Fields
Road
Resurfacing 












500,000
 38
Olympia
Fields IL Water Suburban
Woods/Arcadia
Manhole
Rehabilita3on 












220,000
 7
Olympia
Fields IL Water 2008
Sanitary
Sewer
Manhole
Rehabilita3on
in
Graymoor
and
Hawthorne
Hills
Subdivisions 












260,000
 9
Olympia
Fields IL Water Watermain
Valve
Replacements 












175,000
 9
Olympia
Fields IL Water Athena
Park/Olympia
Woods
Manhole
Rehabilita3on 












330,000
 11
Olympia
Fields IL Water Environmental
enhancement
of
Graymoor
ponds 












300,000
 20
Olympia
Fields IL Water Elevated
Tank
Pain3ng
East
Tower 












620,000
 21
Olympia
Fields IL Water Country
Club
Drive
Sewer
Extension 












910,000
 30
Olympia
Fields IL Water Dredging
of
Graymoor
ponds 










1,250,000
 32
Olympia
Fields IL Water Cured‐In‐Place
Pipeline
and
Sewer
Replacement
in
Graymoor
and
Hawthorne
Subdivisions 










1,625,000
 54
Olympia
Fields IL Water Cured‐In‐Place
Pipeline
and
Sewer
Replacement
in
Suburban
Woods
and
Arcadia
Subdivisions 










2,280,000
 76
Olympia
Fields IL Water Cured‐In‐Place
Pipeline
and
Sewer
Replacement
in
Athena
Park
and
Olympia
Woods
Subdivisions 










3,035,000
 102
Orland
Park IL CDBG El
Cameno
Park
Phase
II



Hardscape
including
monument,
sea3ng,
pedestrian



ameni3es.
Interpre3ve

signage,
addi3onal
recrea3on 












200,000
 8
Orland
Park IL CDBG Local
Street
resurfacing 












300,000
 10
Orland
Park IL CDBG 151st
Street
LaGrange
Road
to
West
Avenue
watermain
reconstruc3on 










4,300,000
 25
Orland
Park IL Energy (12)
Compact
helix
wind
turbines 














78,000
 3
Orland
Park IL Energy Installa3on
of
automated
building
controls
‐
modem

automated
control
devices;
Cultural
Center 














35,000
 3
Orland
Park IL Energy Solar
collec3ng
pool
cover;
Centennial
Pool 










1,500,000
 3
Orland
Park IL Energy Replace
(2)
Air
Units
at
Franklin
Loebe
Center
Gym


with
Energy
Efficient
units 














75,000
 4
Orland
Park IL Energy Replace
(3)
Air
Units
at
Civic
Center
with
Energy


Efficient
Units 












125,000
 4
Orland
Park IL Energy Replace
(4)
Air
Units
at
Village
Hall
with
Energy


Efficient
units 












300,000
 4
Orland
Park IL Energy Solar
Thermal
Domes3c
Hot
Water
Hea3ng


System
‐
Village
Hall 










1,500,000
 4
Orland
Park IL Energy Installa3on
of
automated
building
controls
‐
modem
automated
control
devices;
Old
Police
Department 












800,000
 5
Orland
Park IL Energy Replacement
of
T12
lamps
and
magne3c
ballasts


with
high
efficiency
ligh3ng
‐
Village
Hall,
Loebe


Center,

Civic
Center,
Old
Police
Department 










2,000,000
 5
Orland
Park IL Energy Village
Hall,
Civic
Center,
Loebe
Center,
Old
Police


Department
recommissioning;
pneuma3c
controls


on

Variable
Air
Volume
(VAV)
boxes,
demand


ven3la3on
control,
etc. 










1,500,000
 5
Orland
Park IL Energy Green
Roof
system
installed
Village
Hall


Light
weight
substrate,
sedum 










1,500,000
 6
Orland
Park IL Public
Safety Crime‐free
rental
housing
coordinator 














35,000
 1
Orland
Park IL Public
Safety Community
Service
Officers


(Civilian
Police
Aides) 














38,000
 3
Orland
Park IL Streets/Roads ROW
acquisi3on 










1,800,000
 0
Orland
Park IL Streets/Roads Metra
Bridge
Replacement;
LaGrange
Road 








20,000,000
 8
Orland
Park IL Streets/Roads 143rd
Street
and
LaGrange
Road
Intersec3on


Improvement 










9,600,000
 10
Orland
Park IL Streets/Roads 159th
Street:
Ravinia
Avenue
to
Will
Cook
Road,
reconstruc3on
and
widening 








12,000,000
 12
Orland
Park IL Streets/Roads 143rd
Street
Expansion,
Phase
I:
LaGrange
Road
to
108th
Avenue;
Phase
II:
108th
Avenue
to
Will
Cook
Road 








18,600,000
 24
Orland
Park IL Transit Mapping,
prin3ng,
and
distribu3on
of
brochure 















5,000

Orland
Park IL Transit Signage,
marke3ng,
web
hos3ng
for
communica3ons,


demonstra3ons/special
events 












250,000
 2
Orland
Park IL Transit (12)
Transit
kiosks
located
throughout
the
Village


to
provide
travelers
with
real
3me
loca3ons
and


schedules

for
trains,
electric
buses,
bicycles 












150,000
 3
Orland
Park IL Transit Development
of
rou3ng
system,
key
connec3ons


with
mass
transit,
tracking
hardware
and
sobware


for
 










1,500,000
 3
Orland
Park IL Transit Installa3on
of
(6)
Veloway
bike
share
systems
in
key


loca3ons
throughout
the
Village 












150,000
 5
Orland
Park IL Transit Purchase
of
(6)
electric‐powered
passenger
vans 












360,000
 7
Orland
Park IL Water Distribu3on
System
Analysis


Hydraulic
study
and
future
demand
modeling 












150,000
 2
Orland
Park IL Water Large
Meter
Tes3ng 














15,000
 3
Orland
Park IL Water Water
Valve
Exercising 












160,000
 3
Orland
Park IL Water Distribu3on
System
Improvements 












200,000
 4
Orland
Park IL Water Lib
Sta3on
Improvements 












100,000
 4
Orland
Park IL Water Sanitary
Sewer
Lining/Televising
and


Improvements 












200,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
Orland
Park IL Water Wells,
Pump
Sta3on,
and
Storage
Improvements 












200,000
 5
Orland
Park IL Water Crescent
Park
underdrain 














20,000
 7
Orland
Park IL Water Water
Main
Replacement
‐
Ravinia
Ave
and



143rd
St 












850,000
 8
Orland
Park IL Water Fernway
Drainage
Ditch
and
Tinley
Creek


Restora3on 












300,000
 12
Orland
Park IL Water Regional
deten3on
pond 












750,000
 12
Orland
Park IL Water Subdivision
Water
Main
Replacement 










1,750,000
 12
Orland
Park IL Water Water
Main
Reloca3on
and/or
Replacements


143rd
St
‐
Route
45
to
Will
Cook
Rd 










1,500,000
 25
Orland
Park IL Water Flood
Study
Stormwater
Management


Improvements 










1,373,000
 30
Ofawa IL CDBG Historic
restora3on
‐
exterior
and
interior
improvements
of
Reddick
Mansion
for
energy
efficiency
and
 










1,700,000
 42
Ofawa IL Energy Boiler
‐
Replace
aged
inefficient
boiler
at
McKinley
School
for
energy
effiency 












125,000
 5
Ofawa IL Energy Mechanical
‐
Update
mechanical
systems
and
controls
for
energy
efficiency
and
occupant
comfort
at
all
OES

schools 










4,260,000
 38
Ofawa IL Public
Safety 911
system
‐
Hire
2
emergency
dispatchers
to
befer
staff
24
hr
emergency
dispatch
center 












100,000
 2
Ofawa IL Public
Safety COPS
hiring
program
‐
2
new
Police
officers
for
patrol
and
befer
deter
crime 












150,000
 2
Ofawa IL Public
Safety Police
cars
‐
D.A.R.E
vehicle
and
2
marked
squad
cars 














80,000
 3
Ofawa IL Public
Safety Unmarked
cars
‐
4
unmarked
police
cars
for
dec3ve's
division 














80,000
 4
Ofawa IL Public
Safety Equipment/Technology
‐
purchase
6
s3nger
stytems,
5
tac3cal
entry
rifles
and
undercover
surveillance

video/audio
equipment
for
patrols
and
narco3cs
division
and
replace
re3ring
K‐9
unit
including
cost
of
dog 














60,000
 14
Ofawa IL Public
Safety Replace
20‐year
old
failing
fire
engine
with
new
1500
gpm
pumper
fire
engine
‐
(9
firefighters
and
5
mfg
jobs) 












400,000
 14
Ofawa IL Public
Safety South
Fire
Sta3on
rennova3on
‐
repair,
enlarge
and
bring
fire
sta3on
up
to
current
codes
and
standards
‐
bid
in

January
(9
firefighters
and
15
const
jobs) 












500,000
 24
Ofawa IL Schools ADA
Accessability
‐
Replace
failing
wheelchair
libs
at
Lincoln
and
Jefferson
Schools 












130,000
 4
Ofawa IL Schools Security
‐
Provide
phones
in
occupied
spaces/classrooms
at
all
OES
schools
to
enhance
intruder/disaster

response 












140,000
 4
Ofawa IL Schools Expand
‐
Construct
OES
district
storage
to
free
up
space
and
alleviate
school
building
overcrowding 












800,000
 15
Ofawa IL Schools Security
‐
Provide
visitor
management,
access
control,
and
building
security
hardware
including
an3‐intruder

door
hardware 












762,000
 16
Ofawa IL Schools Rennovate
‐
Replace
worn
and
aged
roofs
and
tuck
point
deteriorated
masonry
at
Lincoln
and
Jefferson
Schools













719,000
 20
Ofawa IL Schools Rennovate
‐
refinish
worn
wood
flooring
at
Lincoln
School,
paint
interiors,
and
repair
parking
at
OES
all
schools 










1,425,000
 26
Ofawa IL Schools Classrooms
‐
Construct
classroom
addi3on
at
Jefferson
School
to
alleviate
overcrowding 










2,800,000
 36
Ofawa IL Schools Flooded
school
replacement
‐
replace
uninhabitable
OES
Central
School
flooded
on
9/08
with
new
school
out

of
flood
plain.

Provide
classrooms
for
5th
and
6th
grades
who
have
none. 








24,712,000
 140
Ofawa IL Streets/Roads Enhancement
‐
Fox
River
pedestrian
bridge
‐
provide
walking
bridge
to
connect
high
school
to
YMCA
and
 










1,700,000
 16
Ofawa IL Streets/Roads FAU
Route
rennova3on
‐
Improve
substandard
FAU
routes
 










2,500,000
 18
Ofawa IL Streets/Roads Poplar
Street
/
Bluff
Street
hill.

Out
for
bids
on
1‐07‐08.

This
narrow
street
on
a
very
steep
hill
is
a
local

collector
and
very
dangerous.

This
will
flafen
and
widen
the
street.

20
const
jobs 










1,200,000
 20
Ofawa IL Streets/Roads Dayton
Road
widening
‐
includes
adding
a
bi‐direc3onal
leb
turn
lane
to
bring
a
Kohl's
Dis3bu3on
Center
(400

FTE
jobs)
and
Clover
Distribu3on
Center
(50
FTE
jobs)
to
Ofawa 












400,000
 450
Ofawa IL Transit New
bus
to
replace
failing
old
bus
on
City
elderly
free
bus
program. 














75,000
 3
Ofawa IL Water Well
#11
raw
water
line
‐
replace
failing
line
from
well
to
treatment
facility













125,000
 8
Ofawa IL Water East
Regional
Lib
Sta3on
‐
Construct
new
LS
to
provide
capacity
to
separate
combined
sewers
on
east
side
of

city
and
open
up
capacity
for
City‐owned
Industrial
Park 










8,000,000
 30
Ofawa IL Water Wastewater
Treatment
Plant
‐
ready
to
bid
in
January.

Desparately
needed
repairs
/
updates
30
const
jobs 










8,000,000
 30
Ofawa IL Water Chapel
St.
Water
main
‐
ready
to
bid
in
January
‐
Water
main
to
replace
old
4"
failing
with
a
12"
pipe
to
provide

fire
flow
to
exis3ng
homes
and
proposed
Heritage
Harbor
of
Ofawa
(50
FTE
and
10
const
jobs) 












750,000
 60
Ofawa IL Water West
Water
Tower
‐
Project
is
bid
and
awai3ng
funding.

This
500,000
gal.
tower
is
necessary
to
retain
153

manufacturing
jobs
and
keep
Pilkington
Glass
in
Ofawa.

Also
sa3sfies
the
EPA
mandate
for
more
overhead

storage.

(153
FTE
MFG
+
10
const
jobs
) 










1,500,000
 163
Pala3ne IL CDBG Street
Resurfacing 








15,000,000
 20
Pala3ne IL Public
Safety Reloca3on
of
Pala3ne's
northwest
fire
sta3on












3,000,000
 10
Pala3ne IL Streets/Roads Curb
&
gufer
extension
program 












350,000
 8
Pala3ne IL Streets/Roads Road
resurfacing 










1,650,000
 8
Pala3ne IL Streets/Roads Dundee
Road
signal/pedestrian
crossings
at
Park
Place
entrance 










2,250,000
 10
Pala3ne IL Water Water
tank
maintenance 












650,000
 5
Pala3ne IL Water Drainage
ditch
reconstruc3on
and/or
elimina3on 












200,000
 6
Pala3ne IL Water Sanitary
sewer
sliplining 












150,000
 6
Pala3ne IL Water Storm
sewer
&
drain
3le
replacement/expansion 












200,000
 6
Pala3ne IL Water Water
main
replacement 












440,000
 8
Palos
Park IL Streets/Roads Culvert
Replacement
Projects
for
Flood
Relief 














90,000
 3
Palos
Park IL Streets/Roads Ditch
Regrading
Projects
for
Flood
Relief 












105,000
 4
Palos
Park IL Streets/Roads Sidewalk
Repair
Program 












240,000
 8
Palos
Park IL Streets/Roads Street
Resurfacing
Program 












420,000
 14
Palos
Park IL Water Emergency
Generator
purchase
for
lib
sta3ons 












150,000
 5
Palos
Park IL Water Fire
Hydrant
Replacement
Program 












144,000
 5
Palos
Park IL Water Water
System
Valve
Replacement
Program 












188,000
 6
Palos
Park IL Water Sanitary
Sewer
Cured
in
Place
pipelining 












250,000
 8
Palos
Park IL Water Pump
Sta3on
Rehabilita3on‐‐Water
Storage
Upgrade 










1,800,000
 60
Park
Forest IL Streets/Roads Street
Ligh3ng
Replacement. 












350,000
 5
Park
Forest IL Streets/Roads Park
Forest
Police
Department
Center/Sta3on
Construc3on. 












800,000
 12
Park
Forest IL Streets/Roads Excess
Flow
Treatment
Facility 












657,000
 15
Park
Forest IL Streets/Roads Marshall
Fields
Demoli3on.
Building
tear
down
to
make
space
for
redeveloping
the
business
district. 












950,000
 15
Park
Forest IL Water Water
Main
improvements. 










1,000,000
 20
Paw
Paw IL CDBG Completer
rehabilita3on
of
Peru
Street
with
pavement,
water
main,
storm
sewer,
curb,
sidewalk,
and
gufer. 












545,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Peotone IL Energy Replace
30‐year
old
HVAC
system
in
police
sta3on
with
energy
efficient
system 















6,000
 1
Peotone IL Streets/Roads Wilmington/Peotone
Road
sidewalk 












200,000
 7
Peotone IL Streets/Roads Street
resurfacing 












500,000
 17
Peotone IL Water Generator
installa3on
at
wastewater
treatment
plant 












150,000
 5
Peotone IL Water Removal
of
abandoned
treatment
plant 












100,000
 5
Peotone IL Water Villagewide
sanitary
sewer
lining 












300,000
 10
Peotone IL Water Watermain
replacement 












850,000
 29
Peotone IL Water Construc3on
of
water
tower 










2,500,000
 42
Peru IL CDBG Proposed
headend
provides
the
department
with
necessary
communica3ons
links
to
satellite
signals
and
relays
 












750,000
 21
Peru IL CDBG Reliever
system
for
Marquefe
St.
sanitary
trunk
sewer
system
will
take
the
excess
flow
and
divert
it
around
the
 












825,000
 23
Peru IL CDBG Divide
the
large
combined
sewer
area
into
two
smaller
sub
areas
to
afford
relief. 










7,150,000
 200
Peru IL CDBG Construct
a
high
voltage
interconnects
between
Peru
and
Princeton
to
provide
a
more
reliable
electric
power

network
between
the
two
communi3es. 








15,550,000
 434
Peru IL CDBG Addi3on
of
a
second
powerhouse
on
the
north
side
of
the
exis3ng
Starved
Rock
Lock
&
Dam.
 








20,000,000
 560
Peru IL Energy Wind
turbine
ganera3on.

Replace
2.5
MW
of
electric
genera3ng
capacity
of
its
oil
and
coal
genera3ng
with
a

wind
turbine. 










4,000,000
 114
Peru IL Energy Peru
natural
gas
turbine
genera3on.

Replace
50
MW
of
primary
peak
electric
genera3ng
capability
of
its

exis3ng
genera3on
with
a
natural
gas
turbine. 








38,000,000
 1064
Peru IL Streets/Roads Construc3on
of
new
roadway
to
extend
Wenzel
Road
in
to
Peru's
northern
Commercial
and
Industrial
area.


Will
provide
route
to
relieve
traffic
in
residen3al
area. 








10,323,000
 289
Peru IL Water Construct
drying
beds
at
sanitary
sewer
plant. 












560,000
 16
Peru IL Water Extend
municipal
water
and
sewer
to
open
up
new
development
area
along
Plank
Rd.
and
north
of
Plank
Rd.











1,540,000
 43
Princeton IL CDBG Sewer
and
Water
installa3on
to
Grove
trailer
park 












500,000
 14
Princeton IL CDBG Installa3on
of
sewer
line
to
Greencrob. 












600,000
 17
Princeton IL CDBG Repaving
of
city
streets 












800,000
 22
Princeton IL CDBG Construc3on
of
roadway
extension,
road
overlay,
water
and
sanitary
sewer
extension
to
prepare
city‐
owned

large
parcel
for
development. 












875,000
 25
Princeton IL CDBG Sanitary
sewer
deten3on
for
flooding
overflow
to
prevent
basement
backup
flooding. 










2,900,000
 81
Princeton IL Energy Replace
streetlights
with
incandescent
light
bulbs 












400,000
 11
Princeton IL Energy Install
real
3me
water
and
electric
meters
 












800,000
 22
Quincy IL Public
Safety Public
Infrastructure
to
Support
Economic
Development
Projects 










6,918,000
 250
Quincy IL Streets/Roads Transporta3on
Projects 








10,850,000
 250
Quincy IL Water Environmental
Projects
Construct
new
lime
sobening
treatment
structure
$1,000,000
Replace
chemical
feeding
equipment
and
dust
collec3on
system
$450,000
High
service
(potable
water)
pump
replacement 










7,069,924
 150
Richton
Park IL Energy Energy
Efficiency
at
Village
Hall 












792,000
 13
Richton
Park IL Streets/Roads Poplar
Avenue
Extension 










1,770,000
 25
Richton
Park IL Streets/Roads Town
Center
Roadway
Improvements 










1,500,000
 25
Richton
Park IL Streets/Roads Green
Community
Center 










2,500,000
 50
Richton
Park IL Streets/Roads Expansion
of
Village
Hall 








23,000,000
 55
Richton
Park IL Transit Town
Center
Metra
Garage
Construc3on 








13,500,000
 43
Richton
Park IL Water Town
Center
Stormwater
Improvements 












975,000
 30
Richton
Park IL Water Storm
Sewer
and
Drainage
Improvements 










1,210,000
 57
Richton
Park IL Water Water
and
Sewer
Improvements 










2,800,000
 60
Riverdale IL CDBG Job
Training
Program
through
Demoli3on
Projects 












300,000
 16
Riverdale IL CDBG Abatement/Environmental
Remedia3on
of
buildings
to
be
demolished
as
a
part
of
the
Pacesefer

Redevelopment 










2,250,000
 56
Riverdale IL CDBG Grainery
Demoli3on 










4,000,000
 100
Riverdale IL CDBG Environmental
remedia3on
of
industrial
sites 








10,000,000
 250
Riverdale IL CDBG Pacesefer
Redevelopment
Phases
2,
3,
&
4 








26,000,000
 500
Riverdale IL Energy Winteriza3on
and
Energy
Efficient
Retrofits
of:
Village
Hall,
Resource
Center,
Public
Safety
Building,
and
Public

Works
Garage 










1,250,000
 31
Riverdale IL Public
Safety Surveillance
Camera
System
Installa3on
at
various
loca3ons 












500,000
 13
Riverdale IL Public
Safety Hiring
of
15
addi3onal
Police
Officers 










1,350,000
 15
Riverdale IL Streets/Roads 137th
Street
&
144th
Street
Viaduct
Center
Pier
Impact
Afenuator
Replacement 














80,000
 2
Riverdale IL Streets/Roads 138th
Street,
Halsted
Street
to
Indiana
Avenue,
Ligh3ng
System
Upgrades 












500,000
 13
Riverdale IL Streets/Roads 144th
Street
Business
District
Ornamental
Ligh3ng 












700,000
 18
Riverdale IL Streets/Roads Emergency
Tree
Removal/Trimming 










1,000,000
 25
Riverdale IL Streets/Roads Sidewalk
Repair/Replacement
Program 










1,000,000
 25
Riverdale IL Streets/Roads Street
and
Alley
Resurfacing
Program 








13,000,000
 325
Riverdale IL Transit Riverdale
METRA
Train
Sta3on
Improvements 












250,000
 6
Riverdale IL Transit Ivanhoe
METRA
Train
Sta3on
Improvements 












450,000
 11
Riverdale IL Water 146th
Street
Lib
Sta3on
Upgrades 












300,000
 8
Riverdale IL Water Riverdale
Marina
Water
main/Storm
Sewer
Extension 












300,000
 8
Riverdale IL Water Sanitary
Sewer
Lining
Program 












500,000
 13
Riverdale IL Water Emergency
Water
Main
Repairs/Replacement 










1,000,000
 25
Riverdale IL Water Water
Distribu3on
System
Rehabilita3on/Repairs 










4,050,000
 101
Riverdale IL Water Northeast
Riverdale
Storm
Sewer
Separa3on
Project 










7,000,000
 175
Romeoville IL Streets/Roads Downtown
Sidewalk
Replacement 












400,000
 28
Romeoville IL Streets/Roads Village
Hall
Traffic
Signal 












250,000
 33
Romeoville IL Streets/Roads 135th
Street
Right
Turn
Lane 












350,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
Romeoville IL Streets/Roads 135th
Street
Resurfacing 










1,800,000
 65
Romeoville IL Streets/Roads Village‐wide
Resurfacing 










1,500,000
 80
Romeoville IL Streets/Roads Street
Light
Replacement 










2,500,000
 85
Romeoville IL Streets/Roads Normantown
Road
Expansion 










2,400,000
 115
Romeoville IL Transit PW
Site
Work
Phase
2 












750,000
 60
Romeoville IL Water Highpoint
Lib
Sta3on
Removal 












300,000
 15
Romeoville IL Water Wilco
Lib
Sta3on
Removal 












400,000
 15
Romeoville IL Water Lake
Strini
Wellhouse
Rehab 












500,000
 25
Romeoville IL Water Lewis
University
Lib
Sta3on 












500,000
 25
Romeoville IL Water Woods
Lib
Sta3on
Replacement 












750,000
 25
Romeoville IL Water Historic
District
Sewer
Lining 










1,500,000
 30
Romeoville IL Water Lewis
University
Watermain
Loop 










1,600,000
 80
Romeoville IL Water Phase
2
WWTP
Upgrades 










6,500,000
 240
Sandwich IL Public
Safety Records
and
telecommunica3ons
replacement
‐
systems
currently
in
use
date
back
to
the
late
1980s 














50,000
 0
Sandwich IL Streets/Roads Fairwind
Boulveard
‐
Center
Street
to
Lisbon
Street 










1,200,000
 0
Sandwich IL Streets/Roads Lions
Road
Reconstruc3on
‐
improve
traffic
flow
adjacent
to
a
school
campus 












439,000
 0
Sandwich IL Streets/Roads Main
Street
Reconstruc3on
‐
improve
traffic
safety
and
flow
adjacent
to
a
hospital 












372,000
 0
Sandwich IL Water Clark
Street
Water
Plant
Improvements
‐
replace
750
gpm
well,
increase
treatment
capacity 












905,000
 0
Sandwich IL Water Northwest
Water
System
‐
two
500
gpm
wells,
1MMG
water
tower,
treatment
building,
site
improvements 










3,770,000
 0
Sauk
Village IL CDBG Village‐wide
Valve
and
Fire
Hydrant
Removal
and
Replacement 












500,000
 23
Sauk
Village IL CDBG Culvert
Repair 












100,000
 25
Sauk
Village IL CDBG Village‐wide
Curb
Removal
and
Replacement 












250,000
 26
Sauk
Village IL CDBG Village‐wide
Handicap
Ramp
and
Sidewalk
Replacement 












300,000
 28
Sauk
Village IL CDBG Village‐wide
Street
Resurfacing 










2,200,000
 45
Schaumburg IL Airport Airport
Runway
Rehabillita3on
‐
Phase
2 










1,800,000
 40
Schaumburg IL CDBG Small
Business
Loan
Program 














50,000

Schaumburg IL CDBG James
Court
Roadway
&
Sanitary
Sewer
Repair 












762,880
 30.5
Schaumburg IL Energy Provide
grants
to
nonprofit
organiza3ons
to
perform
energy
efficiency
retrofits 














50,000
 1
Schaumburg IL Energy Conduc3ng
residentail
and
commercial
building
energy
audits 














25,000
 2
Schaumburg IL Energy CO2
Baseline
for
C‐GAP
plan 














50,000
 3
Schaumburg IL Energy Develop
a
public
educa3on
program
to
increase
par3cipa3on
and
efficiency
rates
for
recycling
programs 














25,000
 3
Schaumburg IL Energy Establishing
financial
incen3ve
programs
for
energy
efficiency
improvements
(loan
programs,
rebate
programs,

waive
permit
fees) 














25,000
 3
Schaumburg IL Energy Airport
Light
Retrofit 














40,000
 5
Schaumburg IL Energy LED
Street
Lights
on
Plum
Grove 










1,230,000
 10
Schaumburg IL Energy Mitchell
Blvd
Bikepath 












900,000
 10
Schaumburg IL Energy Public
Safety
Building
Light
Retrofit 














60,000
 10
Schaumburg IL Energy Mar3ngale
Bikepath 










1,200,000
 15
Schaumburg IL Public
Safety Integrated
Automa3c
License
Plate
Reader 












200,000

Schaumburg IL Water Repair
and
Paint
Reservoir
#2 












300,000
 30
Schaumburg IL Water Repair
and
Paint
Reservoir
#22 












300,000
 30
Schaumburg IL Water Repair
Reservoir
#19 












300,000
 30
Schaumburg IL Water Repair
Reservoir
#20 












300,000
 30
Schaumburg IL Water Schaumburg
Road
Watermain
Slipline 












350,000
 30
Schaumburg IL Water Hill
n'
Dale
Improvements 












400,000
 40
Schaumburg IL Water Knightsbridge
Lib
Sta3on 












440,000
 40
Seatonville IL CDBG Water
improvemrnt 














40,000
 1
Seneca IL CDBG Construct
80'
X
40'
addi3on
to
the
Village
Hall
to
house
Police
Department,
911
Center,
Public
Safety
func3on. 












325,000
 9
Seneca IL CDBG Rebuild
shipyard
road
to
truck
route
standards
for
improved
access
to
industrial
park 












968,000
 137
Sheffield IL CDBG Completely
rehabilitate
two
malfunc3oning
and
obsolete
wastewater
lib
sta3ons. 












100,000
 3
Sheridan IL CDBG Construct
roof
over
digestor
and
drying
beds
and
rehabilitate
clarifier
#3
to
improve
treatment
quality. 












250,000
 7
South
Holland IL Energy LED
Bulb
Replacement
at
Traffic
Signals 












205,000
 7
South
Holland IL Energy HVAC
Units
&Controls
in
Municipal
Complex 












642,000
 21
South
Holland IL Public
Safety CALEA
Coordinator 














60,000
 1
South
Holland IL Public
Safety Crime
Free
Housing/Criminal
Analyst
Coordinator 














60,000
 1
South
Holland IL Public
Safety Emergency
Communica3ons
System
and
Center
at
the
Police
Facility 












750,000
 4
South
Holland IL Public
Safety Addi3onal
Police
Officers
on
the
Street/Detec3ve
Division 












350,000
 6
South
Holland IL Streets/Roads Road
Salt
Storage
Dome 












653,000
 16
South
Holland IL Streets/Roads Town
Center
Parking
Lot 












430,000
 17
South
Holland IL Streets/Roads Prince
Drive
Bike
Path 












685,000
 27
South
Holland IL Streets/Roads VanDam
Frontage
Road
Reconstruc3on 












810,000
 32
South
Holland IL Streets/Roads Wausau
Avenue
Extension
at
US
Route
6 










1,220,000
 51
South
Holland IL Streets/Roads Pavement
Management
Resurfacing
Program 










8,360,000
 278
South
Holland IL Water Water
Main
Replacement
at
Cofage
Grove
Avenue
Bridge 












106,340
 4
South
Holland IL Water Sibley
Pump
Sta3on
Rehabilita3on 












133,000
 5
South
Holland IL Water US
Route
6
Water
Main
Reloca3on 












400,000
 13
South
Holland IL Water Canal
Street
Water
Tower
Pain3ng,
Cleaning
and
Repair 












422,000
 14
South
Holland IL Water Thornton
Ave
Relief
Sewer 












410,000
 15
South
Holland IL Water Veterans
Park
South
Stormwater
Reten3on
Facility 










1,835,000
 46
South
Holland IL Water Sanitary
Sewer
Rehabilita3on
and
Replacement 








12,380,000
 247
City State Program Project
Descrip3on Funding
Required Jobs
South
Wilmington IL CDBG Storm
sewer
improvements 












400,000
 11
South
Wilmington IL CDBG Street
improvements 












400,000
 11
South
Wilmington IL CDBG Construc3on
of
new
water
tower
to
replace
aging
undersized
structure
and
watermain
replacement 












800,000
 22
Spring
Valley IL Water Construct
the
Ladd
Road
sewer
replacement,
including
reconstruc3on
of
a
por3on
of
Ladd
Road
that
will
be

impacted
by
construc3on. 










1,800,000
 50
Spring
Valley IL Water Separate
combined
sewer
system
in
two
problem
areas
that
create
health
and
water
problems 










2,500,000
 70
Standard IL Water Construct
new
water
treatment
plant
for
purpose
of
removing
elevated
level
of
radium
from
the
water
supply. 












895,999
 25
Streator IL Energy City
Hall
HVAC
Rehabilita3on 












800,000
 8
Streator IL Streets/Roads 2008
Roadway
Maintenance
(Overlay
and
Reconstru3on
of
various
City
streets) 










2,000,000
 20
Streator IL Streets/Roads City
Sidewalk
Rehabilita3on
Program 












350,000
 20
Streator IL Streets/Roads Oakley
Avenue
Patching
&
Resurface 












500,000
 20
Streator IL Streets/Roads S.
Ofer
Creek
Road
Bridge
Replacements
(Project
will
repace
two
aging
box
culverts) 












300,000
 20
Streator IL Water Wastewater
Treatment
Plant
Equipment
Upgrade
(This
project
will
replace
aging
and
failed
rotor,
influent

pump,
and
valve
equipment
at
the
City's
sewer
plant) 












375,000
 10
Streator IL Water Center
Street
Storm
Sewer
Project
(This
project
will
alleviate
basement
flooding
issues
in
a
combined
sewer

area) 












100,000
 15
Streator IL Water Coal
Run
Creek
Sewer
Upgrade
(This
project
will
alleviate
a
combined
sewer
overflow
capacity
issue) 














60,000
 15
Streator IL Water Kent
Street
Interceptor
Sewer
(This
project
will
replace
an
80
year
old
brick
sanitary
sewer
that
has
failed
over

15
3mes
in
the
last
20
years.

In
addi3on
the
project
will
abandon
11
combined
sewer
overflows) 








14,000,000
 100
Thornton IL CDBG Infrastructure
Improvement‐
Bury
Overhead
U3li3es.











5,400,000

Thornton IL CDBG Streetscape
and
Infrastructure
Imporvements
‐
Includes
u3lity
improvements,streetscape,
signage,
sidewalks,

plan3ng,
etc. 










6,500,000

Thornton IL Public
Safety Police
Dept.
take
home
car
program.
‐
Each
officer
is
assigned
their
own
squad
enabling
major
cost
saving
 












275,000

Thornton IL Public
Safety Purchase
(1)
100
b
Arial
Plazorm
for
the
purpose
of
fire
ex3nguishment
and
rescue.
This
vehicle
would
be

u3lized
as
a
technical
rescue
vehicle
for
the
Thornton
Quarry
which
is
the
largest
opera3onal
limestone
quarry

in
the
United
States.
 












975,000

Thornton IL Streets/Roads Street
Resurfacing
Village
Wide
Street
Resurfacing
Project.













800,000

Thornton IL Water 12"
Arterial
Water
Main
and
Appurtenances
(7,100').

Replacement
of
aging
undersized
arterial
water
main.
 










3,500,000

Thornton IL Water Sewer
Rehabilita3on
‐
Downtown
Area. 












100,000

Thornton IL Water Water
Pumping
Sta3on
Improvements.
Includes
Pumps,SCADA,Emergency
Generator,
Chlorine
System,
Etc. 










1,800,000

Tinley
Park IL Energy LED
Traffic
Signals
‐
energy
reduc3on
program 












175,000
 5
Tinley
Park IL Public
Safety Hire
one
(1)
School
Resource
Officer
(SRO)
to
act
as
liason
between
the
Village
Police
Department
and
the

seventeen
(17)
Schools
within
the
Village
Boundaries.

This
includes
two
(2)
major
high
schools; 












132,821
 1
Tinley
Park IL Public
Safety Hire
four
(4)
full
3me
patrol
officers
in
the
Village
Police
Department.

These
officers
would
help
to
replace

officers
lost
through
afri3on
(The
Village
is
currently
in
a
hiring
freeze
on
employees
"lost"
through
afri3on).


In
addi3on,
the
Village 












531,284
 4
Tinley
Park IL Public
Safety Purchase
of
ten
(10)
Kustom
Signals
in
squad
digital
video
cameras.

Cameras
will
increase
safety
for
officers,

assist
in
prosecu3on
of
criminal
cases
and
internal
affairs
inves3ga3ons. 














48,000
 5
Tinley
Park IL Streets/Roads Fire
Training
Tower/Intergovernmental
Risk
Management
Associa3on
training
lot
rehabilita3on
to

repair/rehabilitate
exis3ng
training
site
used
for
regional
training
of
emergency
personnel. 












550,000
 15
Tinley
Park IL Streets/Roads 2009
Pavement
Management
program,
to
complete
work
necessary
to
stay
ahead
of
the
deteriora3on
curve. 










3,000,000
 60
Tinley
Park IL Transit 80th
Avenue
Commuter
parking
lot
traffic
signal
upgrades
‐
1500
daily
users 












225,000
 8
Tinley
Park IL Transit Central
Middle
School
commuter
parking
lot 










1,400,000
 20
Tinley
Park IL Water 171st
Street
water
main
replacement
‐
for
reconstruc3on
of
grade
school 












450,000
 10
Tinley
Park IL Water 183rd
Street
Pump
Sta3on
Rehab. 












160,000
 16
Tinley
Park IL Water Repair
of
dilapidated
sanitar
sewers
with
insitu‐repairs 










1,050,000
 25
Tinley
Park IL Water Kimberly
Heights
water
mains
‐
to
add
area
into
a
public
system
and
eliminate
wells 










1,550,000
 30
Tinley
Park IL Water COnversion
to
Naturalized
Stormwater
Basins 










1,000,000
 100
Tiskilwa IL Water Exis3ng
tower
is
a
40,000
gallon
concrete
vault
at
the
top
of
a
bluff
at
the
west
side
of
town.

This
project

would
involve
construc3on
of
a
new
tank
at
this
loca3on 












350,000
 10
Tiskilwa IL Water Construct
new
water
treatment
plant
for
iron
and
arsenic
removal
to
replace
deteriora3ng
facility. 












450,000
 13
Tiskilwa IL Water Construc3on
includes
the
replacement
of
exis3ng
broken
and
leaking
hydrants
and
valves,
installing
new
valves

at
strategic
loca3ons
to
provide
more
efficient
opera3on
of
the
distribu3on
system
and
to
construct
new
water

mains
to
loop
the
exis3ng
main 












450,000
 13
Toluca IL Streets/Roads Reconstruct
approximately
1200l.f.
of
roadway
leading
to
Windsor/Bernardi
Food
Manufacturing
Plant. 












425,000
 12
Tonica IL CDBG Construct
new
public
works
garage,
office,
and
shop
facility
to
replace
leased
one.














280,000
 8
Tonica IL CDBG Street
replacements
on
Main
and
Wauponis.
Construct
new
profile
to
replace
old
railroad
crossing,
construct

new
street
base
and
surface,
construct
new
curb
and
gufer. 












460,000
 13
Tonica IL Water Construct
new
wastewater
treatment
facili3es
to
upgrade
and
replace
deteriora3ng
facili3es. 










1,500,000
 42
Troy
Grove IL CDBG Construc3on
of
new
wastewater
treatment
and
collec3on
system
for
community
that
has
no
central
sanitary

system. 










2,300,000
 64
Varna IL Water Replacement
of
undersized
and
deteriora3ng
water
mains
in
the
community.

Several
water
breaks
have

occurred
leaving
residents
without
water. 












500,000
 14
Verona IL CDBG Street
improvements 












300,000
 8
Watseka IL Water Elimina3on
of
combined
sewer
overflow 












300,000
 12
Watseka IL Water Sewer
televising
and
grou3ng 












500,000
 17
Watseka IL Water Villagewide
road
resurfacing 










1,000,000
 33
Watseka IL Water Upgrade
wastewater
treatment
plant
facili3es
for
excess
flow 










1,800,000
 60
City State Program Project
Descrip3on Funding
Required Jobs
Wenona IL Water Replace
deteriorated
sewer
trunk
line,
replace
combined
sewer
overflow,
replace
very
an3quated
lib
sta3on,

rehabilitate
treatment
plant
to
eliminate
discharge
viola3ons. 










1,800,000
 50
West
Brooklyn IL CDBG Replace
exis3ng
cast
iron
main
with
a
new
6"
water
main
to
prevent
leaks
and
breaks
causing
boil
orders
from

occuring
again
in
the
future. 












172,500
 5
West
Brooklyn IL CDBG Construc3on
of
a
new
sidewalk,
the
Downtown
sidewalk/Johnson
Street,
to
replace
the
deteriorated
sidewalk,

to
provide
an
ADA
compliant
entrance
to
all
of
the
exis3ng
businesses,
and
to
add
decora3ve
ligh3ng
and

handrails
to
beau3fy
the
downtown
area. 












345,000
 10
West
Brooklyn IL CDBG Construc3on
of
an
elevated
storage
tank
that
would
provide
more
adequate
fire
flow
and
pressure
while
also

providing
new
chemical
feed
and
control
systems
to
enhance
and
repair
the
current
issues. 












460,000
 13
Woodridge IL CDBG 63rd
Street
Stormwater
Inlet
Improvement 














50,000
 4
Woodridge IL CDBG Heritage
Parkway
Bikepath
Extension 














72,000
 4
Woodridge IL CDBG Building
Demoli3on/Future
Senior
Housing
Facility
Site 












200,000
 5
Woodridge IL CDBG Construc3on
of
a
Municipal
Road
Salt
Storage
Dome 












300,000
 5
Woodridge IL CDBG Stormwater
Lining
Project:
48"
Corrugated
Metal
Pipe
Lining 












225,000
 5
Woodridge IL CDBG Construc3on
of
Outdoor
Material
Storage
Facility 












300,000
 6
Woodridge IL CDBG Crabtree
Stream
Bank
Erosion
Mi3ga3on
and
Outlet
Pipe
Restora3on
Project 












200,000
 7
Woodridge IL CDBG Police
Department
Facility
Expansion 










9,000,000
 90
Woodridge IL Streets/Roads Bridge
over
Illinois
Route
53
and
Mulligan
Drive
for
Pedestrian
and
Bicycle
Traffic
 










2,300,000
 30
Woodridge IL Streets/Roads Roadway
Resurfacing
and
Rehabilita3on
Project
throughout
the
Village 










2,411,200
 32
Woodridge IL Water Sanitary
Lib
Sta3on
By‐pass
Improvements
and
Pump
Rebuild
Project 














20,000
 2
Woodridge IL Water Water
System
Hydrant
and
Valve
Replacement
Project 












100,000
 2
Woodridge IL Water Remove,
Rebuild
and
Restore
Well
#4
of
the
Woodridge
Well
Water
Source
Back‐up
Water
System 














56,000
 3
Woodridge IL Water Purchase
and
Installa3on
of
Water/Sanitary
Back‐up
Power
Generator
 












150,000
 4
Woodridge IL Water Sanitary
System
Reconstruc3on,
Lining,
Point
Repairs
in
Woodridge
Basin
B,
C,
and
D 












676,000
 7
Woodridge IL Water Woodridge
Water
System
Improvement:
Brenwood
Watermain
Extension 












650,000
 7
Woodridge IL Water Woodridge
Water
System
Improvement:
Phase
II
Extension
of
Pleasantdale
Watermain
 












875,000
 9
Woodridge IL Water Watermain
Infrastructure
Replacement
Program 










1,200,000
 12
Worth IL Energy Installa3on
of
new
generator
for
emergency
use
at
Police
Sta3on,
Fire
House,
and
Village
Hall 














40,000
 2
Worth IL Streets/Roads Villagewide
pavement
resurfacing 












200,000
 7
Worth IL Streets/Roads One
mile
of
107th
Street
PCC
patching
and
microsurfacing 












400,000
 14
Worth IL Water Recrea3onal
area
stormwater
deten3on
basin 












250,000
 9
Worth IL Water Villagewide
sanitary
sewer
lining 












500,000
 17
Wyanet IL CDBG Replace
exis3ng
broken
and
leaking
hydrants
and
valves,
installing
new
valves
at
strategic
loca3ons
to
provide

more
efficient
opera3on
of
the
distribu3on
system
and
to
replace
small
diameter
and
failing
water
mains. 












420,000
 12
Wyanet IL Water Replace
or
reline
broken
and
leaking
sanitary
sewer
mains,
and
replace
leaking
and
deteriorated
manholes. 












450,000
 13
Wyanet IL Water Replacement/construc3on
of
new
water
mains
in
major
part
of
community
to
replace
undersized
and

deteriorated
water
main. 












965,000
 27
Carmel IN CDBG Inter
Urban
Trail
‐
Construc3on
of
trail
and
reconstruc3on
of
exis3ng
rail
bridge. 










1,000,000
 30
Carmel IN CDBG Central
Park
Phase
II
‐
Includes
construc3on
of
shelters,
restroom
building,
and
playground
including
spray
park











1,500,000
 45
Carmel IN CDBG Central
Park
Aqua3c
Center
Phase
II
‐
Constru3on
of
addi3onal
water
slide
and
wave
pool. 










2,500,000
 75
Carmel IN CDBG Central
Park
Mee3ng
House
‐
Reconstruc3on
of
exis3ng
mee3ng
house
and
construc3on
of
new
parking
area. 










2,300,000
 75
Carmel IN CDBG Founders
Park
Phase
II
Construc3on
‐
including
playground
equipment,
shelter
house,
restrooms,
and

community
building. 










3,000,000
 90
Carmel IN CDBG Hazel
Dell
Park
Phase
III
‐
Includes
construc3on
of
shelters,
trails,
and
bridge
connec3on
to
adjacent
park
on

opposite
side
of
White
River 










3,500,000
 105
Carmel IN CDBG Park
Maintenance
Building
Construc3on
‐
New
Maintenance
Building
to
allow
Carmel
Parks
to
consolidate
all

maintenance
opera3ons
in
one
loca3on 










3,500,000
 105
Carmel IN CDBG Central
Park
116th
Street
Entrance
‐
Construc3on
of
entrance
and
interior
park
roadway
to
befer
access

exis3ng
facili3es 










4,500,000
 135
Carmel IN CDBG City
Center
Parking
Structure
Phase
I 










8,000,000
 240
Carmel IN CDBG City
Center
Parking
Structure
Phase
II 








12,000,000
 360
Carmel IN Public
Safety Mobile
Video
System 












400,000
 3
Carmel IN Public
Safety Citywide
Video
System 










2,000,000
 25
Carmel IN Public
Safety Fire
Engine
Purchase
‐
2
New
Fire
Engines 










2,000,000
 60
Carmel IN Public
Safety Carmel
Fire
Sta3on
No.
43
Construc3on 










4,000,000
 120
Carmel IN Public
Safety Carmel
Fire
Sta3on
No.
44
Construc3on 










4,000,000
 120
Carmel IN Public
Safety Carmel
Police
Sta3on
and
City
Court
Building
Construc3on 










6,000,000
 150
Carmel IN Public
Safety Communica3on
Center
Construc3on
‐
Emergency
Opera3ons
Center
which
houses
the
Emergency

Management
and
Public
Safety
Communica3ons
Command
&
Controls 








12,000,000
 360
Carmel IN Streets/Roads Southwest
Clay
Township
Miscellaneous
Drainage
Improvements
in
Sa3sfac3on
of
Annexa3on
Agreement

(Carmel/Hamilton
County
Joint
Project) 












900,000
 27
Carmel IN Streets/Roads 106th
Street
&
Shelborne
roundabout 










1,000,000
 30
Carmel IN Streets/Roads 141st
Street
&
Shelborne
roundabout 










1,000,000
 30
Carmel IN Streets/Roads Towne
Road
Mul3‐Use
Path
Project
‐
Phase
I
‐
106th
to
116th
and
116th
Street
Path
Connec3ons
to
Parks 










1,200,000
 36
Carmel IN Streets/Roads 111th
St.
&
College
Ave.
Roundabout 










1,300,000
 39
Carmel IN Streets/Roads 106th
Street
&
Hazel
Dell
Pkwy
Roundabout` 










1,500,000
 45
Carmel IN Streets/Roads 106th
Street
&
Towne
Rd.
Roundabout 










1,500,000
 45
Carmel IN Streets/Roads 111th
Street
&
Pennsylvania
Street
roundabout 










1,500,000
 45
Carmel IN Streets/Roads Hazel
Dell
Pkwy
&
116th
Street
Roundabout
Construc3on 










1,750,000
 53
Carmel IN Streets/Roads Old
Meridian
Street
&
Carmel
Drive
Roundabout
Construc3on 










1,750,000
 53
Carmel IN Streets/Roads Towne
Road
&
116th
Street
Roundabout
Construc3on 










1,750,000
 53
Carmel IN Streets/Roads 126th
Street
&
Gray
Rd.
Roundabout
Construc3on 










1,800,000
 54
City State Program Project
Descrip3on Funding
Required Jobs
Carmel IN Streets/Roads 131st
Street
&
Gray
Rd.
Roundabout
Construc3on 










1,800,000
 54
Carmel IN Streets/Roads 136th
Street
&
Gray
Rd.
Roundabout
Construc3on 










1,800,000
 54
Carmel IN Streets/Roads 106th
and
Ditch
Road
Roundabout
(Carmel/Hamilton
County
Joint
Project 










2,000,000
 60
Carmel IN Streets/Roads 106th
Street
Mul3‐Use
Path
Project
‐
Phase
I
(Carmel
Engineering/Carmel
Water
Joint
Project) 










2,000,000
 60
Carmel IN Streets/Roads 3rd
Ave.
SW
Reconstruc3on
from
Gradel
Drive
to
City
Center
Drive 










2,500,000
 75
Carmel IN Streets/Roads Hazel
Dell
Road
miscellaneous
improvements
between
116th
Street
and
146th
Street 










2,600,000
 78
Carmel IN Streets/Roads 131st
Street
parallel
mul3‐use
path
from
Hazel
Dell
Parkway
to
Keystone
Ave. 










3,000,000
 90
Carmel IN Streets/Roads 131st
Street
Reconstruc3on
from
US‐31
to
Springmill
Rd. 










3,500,000
 105
Carmel IN Streets/Roads Guilford
Road
‐
City
Center
Drive
to
131st
Street
improvement:
indluding
roundabout
at
131st
St.,
turning
lane,

storm
sewers,
curbs 










3,500,000
 105
Carmel IN Streets/Roads Guilford
Road
reconstruc3on
from
116th
St.
to
City
Center
Drive 










3,500,000
 105
Carmel IN Streets/Roads 126th
Street
from
Shelborne
Road
to
Towne
Road 










4,000,000
 108
Carmel IN Streets/Roads Gray
Road
&
116th
Street
Roundabout
Construc3on 










3,600,000
 108
Carmel IN Streets/Roads Carmel
Drive
and
City
Center
Drive
Roundabout
Construc3on 










4,000,000
 120
Carmel IN Streets/Roads 96th
and
Towne
Road
Roundabout
(Carmel/Hamilton
County
Joint
Project 










4,500,000
 135
Carmel IN Streets/Roads Veterans
Way
Extension
from
City
Center
Drive
to
Main
Street 










4,500,000
 135
Carmel IN Streets/Roads 96th
St.
Improvements
–
Shelborne
Rd.
to
Towne
Rd.
(Carmel/Hamilton
Co.
Joint
Project) 










5,000,000
 150
Carmel IN Streets/Roads 96th
Street
&
Commerce
Dr.
Project
(Carmel/Hamilton
Co.
Joint
Project)
‐
Improvements
on
96th
between

Michigan
Rd.
&
Shelborne 










5,000,000
 150
Carmel IN Streets/Roads Towne
Road
Reconstruc3on
‐
131st
Street
to
146th
Street
crea3ng
a
4‐lane
blvd
with
mul3‐use
paths,
curbs,

and
storm
sewers 










5,000,000
 150
Carmel IN Streets/Roads Rangeline
Road
Reconstruc3on
from
136th
Street
to
US‐31 










6,000,000
 180
Carmel IN Streets/Roads Shelborne
Road
from
north
of
116th
Street
to
131st
Street 










6,500,000
 195
Carmel IN Streets/Roads 131st
Street
Reconstruc3on
From
4th
Ave.
SW
to
US‐31 










7,000,000
 210
Carmel IN Streets/Roads Illinois
Street
Construc3on
Phase
III‐
103rd
to
116th
‐
Construc3on
of
a
new
4‐lane
boulvard 










8,000,000
 240
Carmel IN Streets/Roads 3rd
Avenue
SW
Reconstruc3on
and
Esplanade
from
City
Center
Drive
to
2nd
Street
SW 










8,500,000
 255
Carmel IN Streets/Roads Veteran's
Way
Construc3on
from
City
Center
Drive
to
Execu3ve
Drive 










8,500,000
 255
Carmel IN Streets/Roads Keystone
Avenue

and
136th
Street 








19,400,000
 582
Carmel IN Streets/Roads River
Road
Reconstruc3on
from
116th
Street
to
146th
Street 








22,000,000
 660
Carmel IN Streets/Roads Keystone
and
131st
Street
Interchange
construc3on 








24,600,000
 738
Carmel IN Streets/Roads Keystone
Avenue
at
116th
Street
and
Carmel
Drive
interchanges‐

These
intersec3ons
will
be
converted
to
an
interchange
and
the
traffic
signal
will
be
eliminated.

Construc3on
is

scheduled
to
begin
in
early
2009.

116th
Street
and
Carmel
Drive
closures
 








38,000,000
 1140
Carmel IN Streets/Roads 96th
Street
&
Keystone
Ave.
Interchange
Construc3on
‐
The
current
signalized
intersec3on
will
be
converted
to

an
interchange 








50,000,000
 1500
Carmel IN Transit Public
Transporta3on
Garage
Construc3on
and
Purchase
of
New
Vehicles 










5,000,000
 150
Carmel IN Water Wind
Turbine
Project 










4,000,000
 25
Carmel IN Water Waste
Water
Treatment
Plant
Upgrade 








20,000,000
 300
Carmel IN Water New
36"
Water
Transmission
Line
Installa3on
and
Construc3on
of
New
Water
Plant
to
Serve
expanding

western
Carmel 








50,000,000
 1500
Crawfordsville IN Streets/Roads Mill
Street
Road
Reconstruc3on
Project
from
Elmore
Street
to
South
BLVD 










2,000,000
 500
Crown
Point IN Streets/Roads Court
Street
Resurfacing 












300,000
 10
Crown
Point IN Streets/Roads North
Street
Improvements
Servicing
New
I‐65
Interchance 












500,000
 16
Crown
Point IN Streets/Roads West
Street
Reconstruc3on 












850,000
 28
Crown
Point IN Streets/Roads Broadwy
Improvements,
including
intersec3ons,
93rd
to
SR231 








22,000,000
 200
Crown
Point IN Water Northwest
Sewer
Expansion 










1,000,000
 10
Crown
Point IN Water Addi3onal
Above
Ground
Storage 










2,000,000
 20
East
Chicago IN CDBG This
work
shall
include
but
not
limited
to
new
HMA
pavement,
textured
concrete
pavement,
concrete
sidewalk,

storm
and
sanitary
sewers,
concrete
curb
&
gufers;
new
traffic
signal
at
the
intersec3ons;
landscaping;
and

ornamental
street
ligh3ng.
 










6,000,000
 75
East
Chicago IN Schools Central
High
School
‐
The
project
consists
of
a
digital
phone
system,
42"
flat
screen
video
monitors,
computers

and
white
board
technology,
computerized
textbook
inventory
system,
barcode
scanners
in
the
cafeteria,

technology
2000
lab,
replacement
of
pres 










3,000,000

East
Chicago IN Schools Lincoln
Elementary
School
‐
This
project
consists
of
rebuilding
the
school.

The
school
was
originally
erected
in

1970. 








20,000,000

East
Chicago IN Schools Renova3on
of
Block
Jr.
High
School
‐
This
project
consists
of
a
new
fire
system,
ADA
compliance,
swimming

pool
repairs,
and
maintenance
issues
that
need
to
be
addressed.

The
school
was
originally
erected
in
1968. 










3,000,000

East
Chicago IN Schools School
Administra3on
Office
‐
This
project
consists
of
new
access/security
system
for
the
building. 












150,000

East
Chicago IN Streets/Roads Bike
Trail
‐
This
project
consists
of
construc3on
of
a
mul3‐purpose
trail
along
the
Grand
Calumet
River.

It
will

be
joining
three
city's.

It
will
involve
new
pavement,
sidewalks,
ornamental
ligh3ng,
and
site
elements. 










1,100,000
 20
East
Chicago IN Streets/Roads East
Columbus
Drive
Beau3fica3on
Project
‐
This
project
once
completed
will
bring
new
thema3c
ligh3ng,

landmark
elements
at
the
city
limit
and
key
intersec3ons,
pedestrian/bike
pathways,
as
well
as
traffic

generators,
and
way
finding
signage.

 










1,150,000
 30
East
Chicago IN Streets/Roads Neighborhood
Ornmental
Ligh3ng
Project
‐
That
includes
the
placement
of
new
light
poles,
controller
cabinets,

handholes
throughout
various
streets
in
the
city.

 










1,233,000
 30
East
Chicago IN Streets/Roads 
Chicago
Avenue;
Cline
to
Kennedy
Avenue
‐
Traffic
Signal
Moderniza3on
and
replacement
of
signal

interconnect.

This
project
includes
transit
pre‐emp3on,
bus
shelters,
ornamental
ligh3ng,
and
new
ADA

sidewalk
ramps. 










1,200,000
 40
East
Chicago IN Streets/Roads 145th
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
including
new

pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
ligh3ng.

Sewer
improvements
shall
include
sepera3 










1,450,000
 40
East
Chicago IN Streets/Roads 151st
Street
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
including

new
pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
ligh3ng.

Sewer
improvements
shall
include
s 










1,450,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
East
Chicago IN Streets/Roads Baring
Avenue
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
including

new
pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
ligh3ng.


Sewer
improvements
shall
include 










1,450,000
 40
East
Chicago IN Streets/Roads Indianapolis
Blvd.
Widening;
between
Carrol
and
McShane
‐
This
project
shall
consist
of
curb
reconstruc3on

and
auxiliary
and/or
parking
lane
widening
at
various
loca3ons
along
Indianapolis
Blvd.

 










1,000,000
 40
East
Chicago IN Streets/Roads Magoun
Avenue
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,

including
new
pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street

ligh3ng.
Sewer
improvements
shall
include
 










1,450,000
 40
East
Chicago IN Streets/Roads Northcote
Avenue
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
roadway
reconstruc3on

including
new
pavement
concrete
curb
and
gufer,
concrete
sidewalk,
ornamental
street
ligh3ng,
and
sewer

sepera3on
of
exis3ng
combined
sewers.

 










1,450,000
 40
East
Chicago IN Streets/Roads Tod
Avenue
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
including

new
pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
ligh3ng.

Sewer
improvements
shall
include
sep 










1,450,000
 40
East
Chicago IN Streets/Roads Traffic
Signal
Moderniza3on
and
replacement
of
signal
interconnec3on
‐

The
project
includes
transit
pre‐
emp3on,
bus
shelters,
bike
lockers
at
the
South
Shore
Sta3on,
and
new
ADA
sidewalk
ramps.

 










2,374,000
 50
East
Chicago IN Streets/Roads Broadway
Reconstruc3on;
Michigan
to
Guthrie
‐
This
work
shall
include
but
not
limited
to
new
HMA
pavement;

textured
concrete
pavement;
concrete
sidewalk;
storm
and
sanitary
sewers;
concrete
curb
&
gufers;
new

traffic
signal
at
the
intersec3on;
landscap 










6,000,000
 75
East
Chicago IN Streets/Roads Main
Street
Reconstruc3on
‐
This
work
shall
include
but
not
limited
to
a
new
HMA
pavement;
textured

concrete
pavement;
concrete
sidewalk;
storm
and
sanitary
sewers;
concrete
curb
&
gufers;
new
traffic
signal

at
the
intersec3on;
landscaping;
and
ornamen 










6,000,000
 75
East
Chicago IN Streets/Roads Cline
Avenue
Extension
‐
Reconstruc3on
of
exis3ng
interchange
to
add
approximately
1500'
of
new
bridge
and

a
4
lane
boulevard
to
connect
Broadway
and
Guthrie
Street
intersec3on
to
a
new
bridge
over
Cline
Avenue
(SR

912)
to
the
exis3ng
interchange
prov 








24,000,000
 100
East
Chicago IN Water Solar
Mixers
Project
‐
The
installa3on
of
three
solar
powered
mixers
in
a
CSO
basin
at
the
Wastewater

Treatment
Plant. 












200,000
 7
East
Chicago IN Water Wind
Turbin
Project
‐
The
installa3on
of
a
wind
turbin
to
supplement
the
Wastewater
Treatment
Plant
power

supply.

 












210,000
 7
East
Chicago IN Water Bar
Screen
Replacement
Project
‐
The
purchase
and
installa3on
of
new
bar
screens,
washing
systems,
and

screenings
compac3on
system
at
the
Wastewater
Treatment
Plant. 












609,000
 9
East
Chicago IN Water 145th
Street
Lib
Sta3on
Improvements
‐
The
replacement
and
upgrade
of
bar
screens,
pumps
and
controlls
at

an
exis3ng
stormwater
libing
sta3on. 










1,500,000
 10
East
Chicago IN Water East
Chicago
Water
Treatment
Plant
‐
Construc3on
of
a
new
membrane
Filtra3on
Plant
to
replace
the
city's

exis3ng
plant,
which
has
outlived
it's
life
expectancy.

 








54,400,000
 130
Evansville IN CDBG CURB
RAMP
CONSTRUCTION
Project
involves
the
construc3on
of
curb
ramps
compliant
with
the
Americans
with
Disabili3es
Act
and
arose

out
of
a
Voluntary
Compliance
Agreement
entered
into
with
the
Federal
Highway
Administra3on
in
2002
 












840,000

Evansville IN CDBG SIDEWALK
REPLACEMENT
Project
u3lizes
the
Barref
Law
(IC
36‐9‐36)
and,
under
a
municipal
ordinance
adopted
in
2004,
enables

property
owners
to
pe33on
the
City
and
par3cipate
in
the
cost
of
replacing
sidewalks
adjacent
to
their

property 










2,000,000

Evansville IN CDBG GARVIN
PARK
SHELTER
–
NEW/CONVERT
SHELTER
Convert
or
build
a
new
shelter
to
be
available
for
all
months
of
the
year.

The
current
shelters
or
open
air
and

are
available
only
from
April
to
November.

 












125,000
 1
Evansville IN CDBG WESSELMAN
PARK
SHELTER
–
NEW/CONVERT
SHELTER
A
new
or
converted
shelter
in
Wesselman
Park
will
provide
for
more
reunions,
wedding
recep3ons
and
par3es

for
the
public.

Currently,
we
have
two
duplex
shelters
that
are
open
air.

 












125,000
 1
Evansville IN CDBG KLEYMEYER
SOFTBALL
COMPLEX
–
SPORTS
RENOVATION
The
Kleymeyer
Sobball
Complex
was
developed
in
the
1970s
over
a
former
landfill.

The
sobball
fields,

backstops,
dugouts,
parking
lot
and
concession
stand/restrooms
need
to
be
renovated
 












350,000
 4
Evansville IN CDBG ADA
IMPROVEMENTS
TO
PARKS
–
RESTROOM
MODIFICATIONS,
SIDEWALKS
RAMPS
&
PARKING
Modify
and
upgrade
all
public
Park
restrooms
to
accommodate
handicapped
patrons;
designate
parking
spaces

and
ensure
all
sidewalks
have
ramps
for
handicapped
access.
 










1,000,000
 10
Evansville IN CDBG BOAT
RAMPS
IMPROVEMENTS
–
INSTALL
PRE‐CAST
CONCRETE
Renovate
Angel
Mounds
and
Dogtown
Boat
Ramps
by
installing
new
concrete
sec3ons.

The
exis3ng
ramps
are

over
30
years
old
and
the
water
edge
of
the
ramps
has
deteriorated
and
has
become
a
problem
 










1,500,000
 15
Evansville IN CDBG DOWNTOWN
GATEWAYS
AND
WAY‐FINDING
SIGNAGE
‐To
improve
ability
to
navigate
and
locate
des3na3ons
in

Downtown
Evansville,
the
City
intends
to
create
a
hierarchy
of
gateways
into
Downtown
and
create
districts

with
a
system
of
way‐finding
signage.

This
p 










2,800,000
 22
Evansville IN CDBG FRONT
DOOR
PRIDE
NEIGHBORHOOD
STREET
AND
STREETSCAPE
IMPROVEMENT‐
The
infrastructure
in
the

Front
Door
Pride
neighborhood
is
in
dire
need
of
repair
and
improvement.

The
Neighborhood
Stabiliza3on

Program
funds
along
with
the
exis3ng
CDBG
and
HOME
fund 










4,300,000
 34
Evansville IN CDBG DOWNTOWN
TRAFFIC
SIGNALIZATION
MODERNIZATION
PROJECT‐
Traffic
flow
into,
within
and
around

downtown
Evansville
will
be
improved
through
this
project.

Aber
conduc3ng
a
Downtown
Traffic
Survey
and

two
Public
Forums,
the
City
intends
to
implement
numero 










4,600,000
 36
Evansville IN CDBG STRAIGHTEN
MAIN
STREET
SERPENTINE‐When
Main
Street
was
closed
to
traffic
and
became
a
pedestrian
mall,

a
brick
serpen3ne
roadway
with
no
curbs
was
installed.
 










4,500,000
 36
Evansville IN CDBG FULTON
AVENUE/RIVERSIDE
DRIVE
STREETSCAPE
ENHANCEMENTS

The
State
of
Indiana
is
funding
and
reconstruc3ng
the
interchange
at
Fulton
Avenue
and
the
Lloyd
Expressway.


This
cost
is
es3mated
at
$32
million.
 










5,300,000
 43
Evansville IN Energy WESSELMAN
PARK
ELECTRICAL
IMPROVEMENTS
–
PARK
LIGHTS
AND
TRANSFORMERS
Upgrade
the
electrical
system
throughout
the
park.

Underground
power
lines
are
over
25
years
old
and
were

not
put
in
conduit.
The
park
experiences
power
outages
 












250,000
 3
Evansville IN Housing Kennedy
Towers
building
entry
replacement 














56,000
 3
Evansville IN Housing Buckner
Towers
boiler
replacement
 














45,000
 4
Evansville IN Housing Buckner
Towers
domes3c
hot
water
boiler
replacement
 














31,000
 4
Evansville IN Housing Kennedy
Towers
boiler
replacement 














45,000
 4
Evansville IN Housing Kennedy
Towers
domes3c
hot
water
boiler
replacement 














31,000
 4
Evansville IN Housing White
Oak
Manor
domes3c
water
storage
tanks 














62,900
 4
City State Program Project
Descrip3on Funding
Required Jobs
Evansville IN Housing Schnute
Apartments
domes3c
water
storage
tanks 














62,900
 5
Evansville IN Housing Schnute
Apartments
covered
entrance 












104,000
 6
Evansville IN Housing White
Oak
Manor
covered
entrance




















 












104,000
 6
Evansville IN Housing Buckner
Towers
parking
lot
resurfacing 












117,000
 8
Evansville IN Housing Caldwell
Homes
security
fencing 












121,000
 8
Evansville IN Housing Fulton
Square
Apartments
security
fencing 














87,000
 8
Evansville IN Housing Kennedy
Towers
parking
lot
resurfacing 












117,000
 8
Evansville IN Public
Safety Funding
for
the
Offender
Reentry
Program 














39,000

Evansville IN Public
Safety Laptops
in
all
cars
(122
laptops
&
docking
sta3ons) 










1,220,000

Evansville IN Public
Safety Outdoor
Firing
Range. 












500,000

Evansville IN Public
Safety Upgrade
connec3vity
at
3
Satellite
offices. 












120,000

Evansville IN Public
Safety Cell
phones
for
all
officers.

There
are
285
officers,
118
currently
have
cell
phones. 














73,920
 0
Evansville IN Public
Safety License
Plate
Recogni3on
Sobware
in
4
cars. 












120,000
 0
Evansville IN Public
Safety Patrol
Rifles
for
all
124
Patrol
Officers. 














99,200
 0
Evansville IN Public
Safety Tasers
for
all
Patrol
Officers.

Only
55
of
124
officers
currently
have
department‐owned
tasers. 














51,750
 0
Evansville IN Public
Safety Video
Cameras
in
all
marked
cars. 












570,000
 0
Evansville IN Public
Safety Addi3on
Liaison
Officer
in
Catholic
High
School
(currently
2
schools
share
one
officer) 














76,350
 1
Evansville IN Public
Safety Addi3onal
Secretary
in
Inves3ga3ons. 














41,768
 1
Evansville IN Public
Safety Funding
for
Weed
&
Seed
South
Coordinator
posi3on 














46,147
 1
Evansville IN Public
Safety Record
Room
Civilian
Supervisors. 












105,000
 3
Evansville IN Public
Safety Salaries,
benefits,
uniforms
&
equipment
for
addi3onal
officers
to
serve
proposed
annexa3on
areas. 












606,681
 9
Evansville IN Schools Install
47
thirty‐sta3on
computer
labs
in
elementary,
middle
and
high
schools,
including
two
Project
Lead
the
 










1,410,000

Evansville IN Schools Install
80
thirty‐sta3on
wireless
laptop
carts
in
all
school
loca3ons 










2,400,000

Evansville IN Schools Install
computers
(300)
for
support
personnel
in
each
school 












300,000

Evansville IN Schools Install
interac3ve
white
boards,
projectors,
sound
enhancement
systems,
and
document
cameras
in
1,500

classrooms
@
$7,000
per
classroom
(includes
labor
of
$900
per
room
to
be
done
by
specially
qualified

installers) 








10,500,000

Evansville IN Schools Installa3on
and
implementa3on
of
an
on‐demand
digital
content
and
streaming
video
system
for
all
buildings

in
district.

This
system
includes
hardware
and
sobware
and
will
eliminate
the
need
for
TV
sets
for
classrooms 












400,000

Evansville IN Schools Sobware
licensing
for
these
4,110
new
computers
(Microsob
Office
Suite)
@
$50.00 












205,500

Evansville IN Schools Bosse
High
School:

Replace
aging,
insufficient
boilers
with
new
high
efficiency
low
maintenance
boilers. 












800,000
 5
Evansville IN Schools Delaware
Elementary
School:

Replace
aging,
insufficient
boilers
with
new
high
efficiency
low
maintenance

boilers. 












800,000
 5
Evansville IN Schools Reitz
High
School:

Replace
aging,
insufficient
boilers
with
new
high
efficiency
low
maintenance
boilers. 












800,000
 5
Evansville IN Schools Bosse
Enlow
Field
Stadium:

Install
ar3ficial
turf
in
place
of
lawn
turf
for
water
conserva3on
and
maintenance

free
care. 












800,000
 8
Evansville IN Schools Central
High
School
Stadium:

Install
ar3ficial
turf
in
place
of
lawn
turf
for
water
conserva3on
and
maintenance

free
care. 












800,000
 8
Evansville IN Schools Reitz
High
School
Stadium:

Install
ar3ficial
turf
in
place
of
lawn
turf
for
water
conserva3on
and
maintenance

free
care. 












800,000
 8
Evansville IN Schools Posi3ons
needed
to
support
addi3onal
technology
listed
above
(interac3ve
white
boards,
projectors,
sound

enhancement
systems,
and
document
cameras
in
classrooms;
30‐sta3on
computer
labs
in
47
schools;
80
30‐
sta3on
wireless
laptop
carts; 9
Evansville IN Schools Technology
&
Innova3on
Center:

Build
a
new
state
of
the
art
technology
center
that
is
LEED
cer3fied. 










3,900,000
 75
Evansville IN Streets/Roads BUENA
VISTA
ROAD
IMPROVEMENTS
(FULTON
AVE.
TO
EAST)
Project
includes
pavement
reconstruc3on
and
improved
geometrics
at
the
intersec3on
of
Fulton
Avenue
and

Buena
Vista
Road,
as
well
as
replacement
of
failing
retaining
wall
structures
at
that
intersec3o 












550,000

Evansville IN Streets/Roads BURKHARDT
ROAD
IMPROVEMENTS
(LLOYD
EXPWY.
TO
LINCOLN
AVE.)
Project
will
alleviate
vehicular
conges3on
and
improve
safety
through
the
construc3on
of
added
travel
lanes

and
associated
improvements
on
Burkhardt
Road
between
State
Route
66
(Lloyd
Expressway 










4,737,168

Evansville IN Streets/Roads LINCOLN
AVENUE
ROAD
IMPROVEMENTS
(KIRKWOOD
DR.
TO
CITY
LIMITS)
Project
includes
road
and
drainage
improvements
to
the
exis3ng
two‐lane
pavement,
as
well
as
widening
to

accommodate
bicyclists;
 










1,120,500

Evansville IN Streets/Roads PIGEON
CREEK
GREENWAY
PASSAGE
‐
INDUSTRIAL
CORRIDOR
PHASE
3
–
PEDESTRIAN/BICYCLE
TRAIL
The

Industrial
Corridor
Phase
3
con3nues
the
Greenway
Passage
from
Phase
2
and
follows
along
the
Pigeon
Creek

levee
to
Louisiana
Street. 












750,000
 8
Evansville IN Streets/Roads PIGEON
CREEK
GREENWAY
PASSAGE
‐
INDUSTRIAL
CORRIDOR
PHASE
2
‐
PEDESTRIAN/BICYCLE
TRAIL
The

Industrial
Corridor
Phase
2
is
the
con3nua3on
of
the
Pigeon
Creek
Greenway
Passage.
Phase
2
starts
at

Franklin
Street
and
follows
the
Pigeon
Creek
to
Lamasco
Park 










2,400,000
 25
Evansville IN Streets/Roads PIGEON
CREEK
GREENWAY
PASSAGE
‐
INDUSTRIAL
CORRIDOR
PH
4
–
VIADUCT
The
Industrial
Corridor
Phase
4

is
a
viaduct
along
the
Pigeon
Creek.
Due
to
poor
soil
condi3ons
a
viaduct
will
need
to
be
constructed
to
ensure

proper
access
along
the
creek.
 










2,800,000
 28
Evansville IN Transit PIGEON
CREEK
GREENWAY
PASSAGE
‐
INDUSTRIAL
CORRIDOR
PH
4
–
VIADUCT
The
Industrial
Corridor
Phase
4
is
a
viaduct
along
the
Pigeon
Creek.

Due
to
poor
soil
condi3ons
a
viaduct
will

need
to
be
constructed
to
ensure
proper
access
along
the
creek. 










2,800,000

Evansville IN Water ALVORD
SEWER
REPAIR
Failing
joints
in
a
60‐inch
reinforced
concrete
sewer
under
Alvord
Boulevard
has
created
voids
under
the

pavement
causing
road
failures.
Repair
would
involve
replacing
joint
seals
in
5,000
feet
of
60‐inch
reinforced

concrete
sewer. 










2,000,000

Evansville IN Water CASS
AVENUE
SEWER
SEPARATION
AND
DRAINAGE
IMPROVEMENT
PROJECT
The
Cass
Avenue
Sewer
Separa3on
Project
is
located
on
the
south
side
of
City
of
Evansville,
east
of
the
Ohio

River.
 








19,468,000

Evansville IN Water DIAMOND
AVENUE
DRAINAGE
IMPROVEMENTS
‐
PHASE
I
Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the

installa3on
of
a
large
diameter
storm
sewer
in
the
area
approximately
bounded
by
Diamond
Avenue,

Heidelbach 










2,800,000

City State Program Project
Descrip3on Funding
Required Jobs
Evansville IN Water DIAMOND
AVENUE
DRAINAGE
IMPROVEMENTS
‐
PHASE
II
Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the

installa3on
of
a
large
diameter
storm
sewer
in
the
area
approximately
bounded
by
Diamond
Avenue,

Heidelbach 










2,800,000

Evansville IN Water DIAMOND
AVENUE
DRAINAGE
IMPROVEMENTS
‐
PHASE
III
Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the

installa3on
of
a
large
diameter
storm
sewer
in
the
area
approximately
bounded
by
Diamond
Avenue,
Evans
Ave











2,900,000

Evansville IN Water DIAMOND
AVENUE
DRAINAGE
IMPROVEMENTS
‐
PHASE
IV
Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the

installa3on
of
a
large
diameter
storm
sewer
in
the
area
approximately
bounded
by
Diamond
Avenue,
Evans

Ave 










4,900,000

Evansville IN Water EASTVIEW
DRAINAGE
IMPROVEMENT
PROJECT









The
project
will
construct
a
new
storm
sewer
trunkline
from
the
K‐3
Lib
Sta3on
ponding
area
to
the

intersec3on
of
Michael
Avenue
and
Margybeth
Avenue.
The
exis3ng
trunkline
would
be
removed.
 










5,500,000

Evansville IN Water JEANETTE

DRAINAGE
IMPROVEMENT
PROJECT
The
project
will
construct
a
new
15‐inch
storm
pipe
along
Hicks
Drive.
This
sewer
line
would
drain
to
a
36‐inch

storm
sewer
that
would
run
west
to
Jeanefe
Avenue.
At
Jeanefe
Avenue
the
sewer
would
be
upsized
 










3,500,000

Evansville IN Water MT.
AUBURN
SEPTIC
TANK
ELIMINATION
The
Mt.
Auburn
Neighborhood
topography
consists
of
steep
highland
and
floodplains.
This
topography
has
led

to
the
poten3al
of
on‐site
wastewater
system
failures.
In
short,
while
the
roadways
exist
above
floodplain
eleve











4,500,000

Evansville IN Water SEPTIC
TANK
ELIMINATION
ON
CAVE
AVENUE

Construc3on
of
a
gravity
sewer
and
lib
sta3on
to
service
100
homes
on
failing
sep3c
systems
on
the
west
side

of
Evansville. 












500,000

Evansville IN Water SEPTIC
TANK
ELIMINATION
ON
FICKAS
ROAD





Construc3on
of
a
gravity
sewer
and
lib
sta3on
to
service
twelve
homes
on
failing
sep3c
systems
on
the
east

side
of
Evansville. 












125,000

Evansville IN Water SOUTHEAST
AVENUE
AND
BROOKSIDE
DRIVE
SEWER
SEPARATION
AND
DRAINIAGE
IMPROVEMENT
PROJECT
The
Southeast
Boulevard
&
Brookside
Drive
Sewer
Separa3on
Project
is
located
on
the
south
side
of
the
City
of

Evansville,
east
of
Ohio
River.

 








24,722,000

Evansville IN Water STATE
HOSPITAL
LAKES
DRAINAGE
IMPROVEMENTS
Project
involves
increasing
the
storage
capacity
of
the
lakes
at
the
Evansville
State
Hospital;
in
conjunc3on
with

recently
completed
improvements,
provides
drainage
relief
to
the
residen3al
areas
along
Colony 












585,000

Evansville IN Water WEINBACH/BOEKE/LLOYD
DRAINAGE
IMPROVEMENTS
Project
will
alleviate
long‐standing
drainage
problems
near
the
intersec3on
of
Division
Street
and
Boeke
Road

through
the
installa3on
of
a
large
diameter
storm
sewer
that
will
be
connected
to
the
Weinbach
Aven 










1,600,000

Evansville IN Water WEINBACH/KECK
DRAINAGE
IMPROVEMENTS
Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the

installa3on
of
storm
sewers
in
the
area
approximately
bounded
by
Diamond
Avenue,
Weinbach
Avenue,
U.S.

41
and
State
Rou 










1,100,000

Fort
Wayne IN Airport D&E
Runway
13/31
Overlay
&
Electric
Imrpovement 














81,300
 2
Fort
Wayne IN Airport D&E
Runway
32
Rehab. 












375,000
 4
Fort
Wayne IN Airport ALP
&
Master
Plan
Update 












650,000
 5
Fort
Wayne IN Airport Airfield
Signage
Improvement
Project 












225,000
 8
Fort
Wayne IN Airport Airfield
Signage
Improvement
Project
Phase
II 












375,000
 8
Fort
Wayne IN Airport Rewire
Runway 












275,000
 10
Fort
Wayne IN Airport Perimeter
Security
Fence 












400,000
 12
Fort
Wayne IN Airport T‐Hangar
Replacement 












650,000
 15
Fort
Wayne IN Airport Runway
13/31
Overlay
&
Electric
Improvements 










1,260,000
 25
Fort
Wayne IN CDBG Small
Business
Revolving
Loan
Fund 










1,500,000

Fort
Wayne IN CDBG Coombs
Street
Realingment 












200,000
 25
Fort
Wayne IN CDBG Calhoun
Street
Conversion 










1,300,000
 30
Fort
Wayne IN CDBG Gingerbread
House
Daycare
Development 












500,000
 30
Fort
Wayne IN CDBG South
Urban
Trail 










1,500,000
 30
Fort
Wayne IN CDBG North
Anthony
Corridor
Infrastructure 












700,000
 40
Fort
Wayne IN CDBG Park
Roads
and
Parking
Lot
Resurfacing 










1,000,000
 40
Fort
Wayne IN CDBG Wells
Street
Infrastructure 










1,100,000
 40
Fort
Wayne IN CDBG Alley
Rehabilita3on 










2,000,000
 80
Fort
Wayne IN CDBG Commercial
Facade
Program 










1,000,000
 80
Fort
Wayne IN CDBG Community
Health
Center 










1,000,000
 80
Fort
Wayne IN CDBG North
River
Redevelopment
(Acquisi3on,
Brownfield
Site
Prep.,
Infrastructure) 








10,000,000
 80
Fort
Wayne IN CDBG Renaissance
Pointe
YMCA 










4,000,000
 80
Fort
Wayne IN CDBG Renaissance
Ponte
Phase
II
Infrastructure 










5,000,000
 80
Fort
Wayne IN CDBG Owner‐occupied
Housing
Rehab. 










2,000,000
 120
Fort
Wayne IN Energy Energy
Efficient
Appliance
Grant 










1,000,000
 3
Fort
Wayne IN Energy City
Solar
&
Wind
Program 










2,400,000
 5
Fort
Wayne IN Energy Weatheriza3on
Grants 










2,000,000
 15
Fort
Wayne IN Energy Green
Technology
Center 










2,500,000
 50
Fort
Wayne IN Housing Brooklyn
Manor
II 












500,000
 10
Fort
Wayne IN Public
Safety 30
Tasers 














24,000

Fort
Wayne IN Public
Safety AFIS
Upgrade 












500,000

Fort
Wayne IN Public
Safety 3
School
Resource
Officers 












240,000
 3
Fort
Wayne IN Public
Safety 5
Officers
for
Neighborhood
Response
Team
Enhancement 












400,000
 5
Fort
Wayne IN Schools School
Infrastructure
23
Elementary
Schools
8
Middle
Schools 






301,100,000
 900
Fort
Wayne IN Streets/Roads Coliseum
Blvd
Trail
and
Riverbank
re‐enforcement

‐
0.7
miles 












450,000
 25
Fort
Wayne IN Streets/Roads Columbia
Street
over
Delta
Lake
bridge
reconstruc3on 












500,000
 25
Fort
Wayne IN Streets/Roads East
State
Blvd
sidewalk
‐
connect
11
neighborhoods
with
5
schools 












500,000
 25
Fort
Wayne IN Streets/Roads Meijer
Road
@
Trier
Ditch
bridge
reconstruc3on 












500,000
 25
City State Program Project
Descrip3on Funding
Required Jobs
Fort
Wayne IN Streets/Roads South
Town
Center
trail
‐
1.2
miles 












360,000
 25
Fort
Wayne IN Streets/Roads Towpath
trail
‐
1
mile 












400,000
 25
Fort
Wayne IN Streets/Roads Bella
Vista
Drive
over
Fairfield
Ditch
bridge
reconstruc3on 












750,000
 30
Fort
Wayne IN Streets/Roads Jefferson
Pointe
Trail
‐
1
mile 












800,000
 30
Fort
Wayne IN Streets/Roads Paulding
Rd
over
Trier
Ditch
bridge
reconstruc3on 












625,000
 30
Fort
Wayne IN Streets/Roads Produc3on
Blvd
over
Spy
Run
Creek
bridge
reconstruc3on 












625,000
 30
Fort
Wayne IN Streets/Roads South
Bend
Drive
over
Graham
McCulloch
Ditch
bridge
reconstruc3on 












625,000
 30
Fort
Wayne IN Streets/Roads State
Blvd
over
Bullerman
Ditch
bridge
reconstruc3on 












750,000
 30
Fort
Wayne IN Streets/Roads State
Blvd
over
Spy
Run
Creek
bridge
reconstruc3on 












750,000
 30
Fort
Wayne IN Streets/Roads Trier
Road
over
Bullerman
Ditch
bridge
reconstruc3on 












625,000
 30
Fort
Wayne IN Streets/Roads Washington
Center
Rd
over
Spy
Run
Creek
bridge
reconstruc3on 












625,000
 30
Fort
Wayne IN Streets/Roads Cougar
Trail
.82
miles 












700,000
 35
Fort
Wayne IN Streets/Roads Progress
Blvd
over
Spy
Run
Creek
bridge
reconstruc3on 












875,000
 35
Fort
Wayne IN Streets/Roads Washington
Center
Road
@
Dartmouth
Intersec3on
reconstruc3on 










1,200,000
 35
Fort
Wayne IN Streets/Roads West
Jefferson
Blvd
over
Graham
McCulloch
Ditch
bridge
reconstruc3on 










1,125,000
 35
Fort
Wayne IN Streets/Roads Concrete
Curb
repair
‐
12
miles 










1,500,000
 40
Fort
Wayne IN Streets/Roads Beckefs
Run
Trail
(St.
Joe
River
to
Coldwater
Rd)
‐
3.5
miles 










1,500,000
 50
Fort
Wayne IN Streets/Roads New
York
Central
Rail
to
Trail
‐
2.5
miles 










1,700,000
 50
Fort
Wayne IN Streets/Roads Power
&
Energy
Trail
‐

2
miles 










1,500,000
 50
Fort
Wayne IN Streets/Roads Aboite
Trails
‐
13
miles 










8,000,000
 55
Fort
Wayne IN Streets/Roads Johnny
Appleseed
to
Shoaff
Park
trail
‐
3
miles 










3,000,000
 60
Fort
Wayne IN Streets/Roads Maplecrest
Arterial
extension 










2,000,000
 60
Fort
Wayne IN Streets/Roads Spring
Street
over
Conway
RR
bridge
reconstruc3on 










2,500,000
 60
Fort
Wayne IN Streets/Roads Auburn
Road
reconstruc3on
widening
and
trail
connec3on 










2,500,000
 70
Fort
Wayne IN Streets/Roads Wayne
Trace
Arterial
reconstruc3on
widening 










3,000,000
 70
Fort
Wayne IN Streets/Roads Covington
Rd
trail
‐
5.5
miles 










5,500,000
 80
Fort
Wayne IN Streets/Roads Sidewalk
construc3on
to
connect
neighborhoods
&
reconstruc3on
of
poor
conditon
sidewalks 










5,000,000
 80
Fort
Wayne IN Streets/Roads Ardmore
Avenue
Arterial

reconstruc3on
widening
and
trail
connec3on 










6,500,000
 85
Fort
Wayne IN Streets/Roads Mar3n
Luther
King
US
27

Bridge
reconstruc3on 










8,000,000
 100
Fort
Wayne IN Streets/Roads Residen3al
Concrete
Street
repair

55
miles
in
poor
or
very
poor
condi3on;
2009
would
include
10
of
these

miles. 










7,200,000
 100
Fort
Wayne IN Streets/Roads ADA
Ramp
requirements
30%
of
city
s3ll
in
non‐compliance
at
an
es3mated
cost
of
$10,000,000.
10%
of
the

30%
to
be
completed
2009 










3,333,333
 125
Fort
Wayne IN Streets/Roads Arterial
Concrete
Street
repair
10
miles
in
system
in
poor
or
very
poor
condi3on;
2009
would
include
6
of
these

miles. 








12,000,000
 160
Fort
Wayne IN Transit IPFW‐Ivy
Tech
Circulator 












639,000
 2
Fort
Wayne IN Transit Northside
Terminal 












500,000
 2
Fort
Wayne IN Transit New
NW
Route 












360,000
 3
Fort
Wayne IN Transit Headquarters
HVAC 












200,000
 4
Fort
Wayne IN Transit Restore
Service
Cuts 










2,000,000
 7
Fort
Wayne IN Transit Downtown
Circulator 










4,000,000
 8
Fort
Wayne IN Transit Rebuild
Baker
Street
Sta3on 










4,500,000
 60
Fort
Wayne IN Transit Superior
Street
Sta3on 












300,000
 60
Fort
Wayne IN Water Beckman
Drain
Improvements,
Improvements
to
stormwater
ditch
to
reduce
local
flooding 












450,000
 0.25
Fort
Wayne IN Water Mardego
Hills
Stormwater
Sytem
Improvements,
Improvements
to
local
stormwater
sewer
system
 












900,000
 0.5
Fort
Wayne IN Water Smith
Street
at
Roosevelt
&
Fairfax
‐
Phase
2
Sewer
Sepera3on,
New
storm
sewers
to
reduce
combined
sewer

overflows
and
local
sewer
capacity
issues 












900,000
 0.5
Fort
Wayne IN Water Southtown
Centre
Stormwater
System
and
Trail,
Improvements
to
local
stormwater
system
performance
to

reduce
local
flooding 












500,000
 0.5
Fort
Wayne IN Water Ewing
Street
Storm
Sewer,
New
storm
sewers
to
reduce
combined
sewer
overflows
and
local
sewer
capacity

issues 










3,000,000
 0.75
Fort
Wayne IN Water Renaissance
Pointe
Stormwater
Basin,
New
deten3on
basin
to
reduce
combined
sewer
overflows
and
local

sewer
capacity
issues 










2,200,000
 0.75
Fort
Wayne IN Water Spy
Run
Creek
Channel
and
Deten3on
Improvements,
Improvements
to
stormwater
ditch
to
reduce
local

flooding 










3,000,000
 0.75
Fort
Wayne IN Water Collec3on
System
Monitoring
and
Control
Improvements
‐
Installa3on
of
facili3es
to
improve
system
real‐3me

opera3ons
and
reduce
overflows














725,000
 5
Fort
Wayne IN Water Aboite
Center
Water
Main
Extension,
New
main
to
improve
system
reliability,
capacity
and
pressure
and

provide
for
system
expansion 












750,000
 7
Fort
Wayne IN Water Anthony
Wayne
Village
‐
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high
maintenance

costs
and
poor
performance 










2,000,000
 7
Fort
Wayne IN Water Bluffton
Road
&
Lower
Hun3ngton
‐
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high

maintenance
costs
and
poor
performance 












600,000
 7
Fort
Wayne IN Water Drexel,
Trentman,
Oxford:
Queen
to
Wayne
Trace
‐
Water
Main
Replacement,
Replacement
of
exis3ng
mains

with
high
maintenance
costs
and
poor
performance 












600,000
 7
Fort
Wayne IN Water Klaehn‐Merrif
Drainage
System
(Illinois
Road)Improvements
to
local
stormwater
sewer
system
performance
to

reduce
local
flooding 












700,000
 7
Fort
Wayne IN Water Riverside,
Hannas,
Paramount
Addi3ons
‐
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high

maintenance
costs
and
poor
performance 










1,275,000
 7
Fort
Wayne IN Water Rothman
SSD
Ellimina3on,
New
relief
sewer
to
eliminate
sanitary
overflows
and
increase
capacity 












660,000
 7
Fort
Wayne IN Water Southwest
Interceptor
CIPP
‐
Rehabilita3on
and
cleaning
of
sewer
to
improve
structural
integrity
and
capacity 










1,750,000
 7
Fort
Wayne IN Water State
Road
1
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high
maintenance
costs
and
poor

performance 












750,000
 7
Fort
Wayne IN Water State
Road
3
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high
maintenance
costs
and
poor

performance 










1,500,000
 7
City State Program Project
Descrip3on Funding
Required Jobs
Fort
Wayne IN Water Union
Chapel
Road
Water
Main
Extension:

Tonkel
to
Puff,
New
main
to
improve
system
reliability,
capacity
and

pressure 












300,000
 7
Fort
Wayne IN Water Warfield
SSD
Ellimina3on,
New
relief
sewer
to
eliminate
sanitary
overflows
and
increase
capacity 










1,435,000
 7
Fort
Wayne IN Water Webster
Street
Storm
Sewer
New
storm
sewers
to
reduce
combined
sewer
overflows
and
local
sewer
capacity

issues 












525,000
 7
Fort
Wayne IN Water Lake
Avenue
Feeder
Main
Project
Phase
3,
New
transmission
main
for
NE
area
of
system
for
improvements
to

capacity
and
pressure
in
area 












800,000
 8
Fort
Wayne IN Water Maplecrest
Water
Main
Extension,
New
transmission
main
for
NE
area
of
system
for
improvements
to
capacity

and
pressure
in
area 










1,450,000
 8
Fort
Wayne IN Water Airport
Expressway
Water
Main
Extension,
New
main
to
improve
system
reliability,
capacity
and
pressure
and

provide
for
system
expansion 










4,000,000
 9
Fort
Wayne IN Water Maplewood
Park
Stormwater
Improvements‐Improvements
to
local
stormwater
sewer
system
performance
to

reduce
local
flooding











1,550,000
 9
Fort
Wayne IN Water NW
Pressure
Zone
Pumping
Improvements‐Rehabilita3on
of
pump
sta3ons
to
improve
reliability
and
increase

capacity 












350,000
 9
Fort
Wayne IN Water Subbassin
R14033
Sewer
Separa3on,
New
storm
sewers
to
reduce
combined
sewer
overflows
and
local
sewer

capacity
issues 










3,550,000
 9
Fort
Wayne IN Water Vance
&
Woodrow
Sewer
Separa3on,
New
storm
sewers
to
reduce
combined
sewer
overflows
and
local
sewer

capacity
issues 










3,250,000
 9
Fort
Wayne IN Water West
Lawn
Sep3c
Elimina3on
Project,
New
sanitary
sewer
system
for
neighborhood
with
failed
sep3c
systems 










5,500,000
 9
Fort
Wayne IN Water Large
Diameter
Interceptor
Cleaning
&
Lining
Package,
Rehabilita3on
and
cleaning
of
large
diameter
sewers
to

improve
structural
integrity
and
capacity 










8,100,000
 10
Fort
Wayne IN Water Lime
Conveyance
Upgrades‐Replacement
of
exis3ng
control
system
components
to
improve
opera3ons 












600,000
 10
Fort
Wayne IN Water NW
Feeder
Main
‐
Phase
3,
New
transmission
main
for
NW
area
of
system
for
improvements
to
capacity
and

pressure
in
area 










5,500,000
 10
Fort
Wayne IN Water St
Joe
‐
Beckef
Relief
Sewer
‐
Phase
1,
New
relief
sewer
to
increase
capacity 










4,750,000
 10
Fort
Wayne IN Water St.
Joseph
Dam
Structural
Rehabilita3on,
Rehabilita3on
of
concrete
dam
structure
to
ensure
structural
integrity

of
dam 










2,200,000
 10
Fort
Wayne IN Water Filter
Valve
and
Filter
Bed
Improvements,
Replacement
of
valves
and
filter
bofoms
to
improve
reliability
of

filters
and
water
quality 










2,100,000
 12
Fort
Wayne IN Water Combined
Sewer
Overflow
Pond
Improvements,
Construc3on
of
new
grit
facili3es,
and
cleaning
and
structural

improvements 








10,880,000
 15
Fort
Wayne IN Water Upper
Ely
Run
Interceptor
Phase
1,
New
relief
sewer
to
increase
capacity 








14,500,000
 15
Fort
Wayne IN Water Aera3on
System
Improvements‐
Phase
2,
2nd
phase
of
improvements
to
Aerea3on
system
to
improve

performance
&
reliability 










3,775,000
 20
Fort
Wayne IN Water Digester
Improvements
Phase
2
(Gas
&
Safety),
2nd
phase
of
improvements
to
Digestors
to
improve

performance
&
reliability 










6,830,000
 20
Fort
Wayne IN Water Filtra3on
Plant
Finished
Water
Reservoir
Improvements
Structural
improvements
and
modifica3ons
to

reservoir
to
improve
opera3ons
reliability 










5,800,000
 20
Fort
Wayne IN Water St
Joe
‐
Beckef
EQ
basin,
New
storage
basing
to
improve
capacity
during
wet
weather
events 








15,540,000
 25
Gary IN Airport Airport
Road
/
Industrial
Blvd.
Roadway
Rehabilita3on:
Project
is
defined
by
the
rehabilita3on
of
the
exis3ng

roadway
&
pavement.

Currently
the
roadway
is
severely
deteriorated.

This
road
serves
as
a
connector
to
Gary‐
Chicago
Interna3onal
Airport,
s 










1,200,000
 8
Gary IN Airport Gary‐Chicago
Interna3onal
Airport:
Project
consists
of
construc3ng
two
high‐speed
exit
taxiways,
apron

construc3on
for
the
Foreign
Trade
Zone
hanger,
the
construc3on
of
T‐Hangars,

and
the
expansion
/

construc3on
of
corporate
hangars. 










3,571,684
 10
Gary IN Airport Gary‐Chicago
Interna3onal
Airport
Fire
Equipment
Moderniza3on:

Project
will
bring
new
rescue
&
firefigh3ng

equipment
and
a
new,
dedicated
hanger.
Such
equipment
and
infrastructure
is
crucial
for
the
current
runway

expansion
project
and
the
traffic
gen 












700,000
 20
Gary IN Airport Airport
Road
/
Industrial
Avenue
Overpass:

Project
includes
building
an
overpass
on
this
roadway
that
would

crossover
the
EJ&E
and
CSX
railroad
tracks.


This
overpass
will
eliminate
a
current
at‐grade
crossing
and
help

with
traffic
and
freight
circula3 








15,000,000
 50
Gary IN Amtrak Union
Sta3on
Amtrak
&
Green
Link
Welcome
Center
brings
crucial
reac3va3on
of
a
downtown
Amtrak
stop.

This
mixed‐use
project
is
defined
by
adap3vely
reusing
the
exis3ng
historic
sta3on
for
public
transit
and
non‐
motorized
transporta3on
(tri‐state
pe 










3,500,000
 30
Gary IN CDBG Barbara
Leek
Wesson
Neighborhood
Center
Moderniza3on:
This
center
brings
various
opportuni3es
to
an

underserved
popula3on
in
the
Mid‐Town
community.
Via
this
project,
the
center
will
be
rehabilitated
for
a

con3nued
20‐yr
lifecycle.
This
rehabilita3on 










1,500,000
 15
Gary IN CDBG Brownfield
Field
Clean
Up:
Environmental
assessments
for
the
proposed
target
sites
indicate
that
clean
up
will

be
necessary
for
the
re‐use
of
these
challenged
parcels.

This
project
requests
clean
up
dollars
for
a
minimum

of
10
brownfields
sites
thus
resu 










1,000,000
 25
Gary IN CDBG City
Wide
Buildings,
ADA
&
General
Improvements:

Improve
numerous
city‐owned
buildings
to
meet
ADA

compliance
and
to
general
moderniza3on.

Buildings
included:
City
Hall,
Adam
Benjamin
Metro
Center,
GPTC

Admin
Building,
Genesis
Center,
Hudso
Campbell,
P 










7,000,000
 25
Gary IN CDBG Crea3ng
Green
Infrastructure
through
Vacant
Property
Management

and
Neighborhood
Beau3fica3on:
This

project
would
employ
and
train
residents
and
youth
to
clean
up
and
clear
a

minimum
of
100
vacant
lots
in
the

city
for
the
purpose
of
securing,
crea3n 










2,000,000
 25
Gary IN CDBG Gary
Marina:

Project
is
to
develop
the
municipal
marina
at
the
lakefront
west
footprint.

Such
a
marina
would

bring
350+
boa3ng
slips,
a
boat
launch,
and
associated
land
base
infrastructure
such
as
storage,
maintenance

facili3es,
etc.

The
marina
will
 








19,000,000
 35
Gary IN CDBG Neighborhood
Center
Capital
Improvement
Strategy:

This
request
will
bring
new
neighborhood
centers
for
the

Glen
Park,
Tolleston,
and
Miller
communi3es.


Via
the
crea3on
of
these
three
centers,
low‐to‐moderate

income
families
will
be
provided
public
se 










3,000,000
 45
Gary IN CDBG Fire
Sta3on
Capital
Improvement
Plans
:
The
Construc3on
of
New
Buildings
for
Various
Fire
Sta3ons
(Six
New

Buildings) 








18,000,000
 75
Gary IN CDBG Department
of
Redevelopment,
Scafered
Site
Redevelopment
Areas:
Acquisi3on,
Demoli3on,
and

Environmental
Remedia3on
 








20,000,000
 80
City State Program Project
Descrip3on Funding
Required Jobs
Gary IN Energy Installa3on
of
Solar
Panels
and
Energy
Retrofits
of
City‐Owned
Buildings:
Project
will
address
publicly
owned

buildings
that
are
not
energy
efficient,
that
cost
unnecessary
thousands
in
u3lity
bills,
and
that
do
not
provide

good
examples
to
the
public
o 










3,000,000
 15
Gary IN Housing Gary
Housing
Authority:
Demoli3on
of
Ivanhoe
Gardens
Public
Housing
development.

Ivanhoe
received

approval
of
their
demoli3on
applica3on
for
Ivanhoe
in
2007.

However,
due
to
numerous
contribu3ng
factors

the
project
has
not
begun. 










1,200,000
 20
Gary IN Housing Gary
Housing
Authority:
Demoli3on
of
Por3on
of
Delaney
West
Public
Housing
Development
deconcentra3on

efforts
by
removing
approximately
42
buildings 












630,000
 20
Gary IN Housing Gary
Housing
Authority:
Demoli3on
of
por3on
of
Dorie
Miller
Public
Housing
Development's
decentra3on

efforts
by
removing
approximately
14
buildings 












210,000
 20
Gary IN Housing Gary
Housing
Authority:
Blue
Light
Security
Camera
System
for
Gary
Public
Housing
Developments
as
well
as

Visibility
for
some
city
streets 










1,500,000
 30
Gary IN Housing Gary
Housing
Authority:
Repair
of
roads
and
sewage
and
water
systems
at
Dorie
Miller
Public
housing

development 










4,500,000
 50
Gary IN Housing Gary
Housing
Authority:
Development
of
700
replacement
housing
units. 






105,000,000
 150
Gary IN Public
Safety Police
Vehicle
Purchase
&
Replacement 












420,000
 3
Gary IN Public
Safety Police
Equipment
Moderniza3on:
New
launchers,
new
uniforms,
tac3cal
plates
for
our
for
our
bullet
proof
vest,

fire‐resistant
suits,
weaponry
(sniper
rifles
and
sub‐automa3c

machine
guns),
recon
robot,
tac3cal
camera,

tac3cal
blankets,
armored
vehicl 












750,000
 4
Gary IN Public
Safety Fire
Department
Vehicle
Replacement 












595,000
 6
Gary IN Public
Safety Fire
Department
Equipment
Moderniza3on:
Requests
include
the
purchase
of
6
new
fire
engines,
2
fire
trucks,

1
tanker
truck,
4
ambulances,
1700
feet
of
5
IN
hose,
Hurst
extrac3on
equipment,
new
ladders,
high
pressure

air
bags
and
pressure
chisels, 










4,852,900
 8
Gary IN Public
Safety Hiring
Firefighters 










4,000,000
 20
Gary IN Public
Safety Hiring
Police
Officers 










4,000,000
 25
Gary IN Streets/Roads Gary
Green
Link,
Phase
II:
Project
con3nues
combined
bicycle
and
pedestrian
trail
westward
to
Gary‐Hammond

border.

The
trail
serves
as
the
major
east‐west
connector
through
Gary
to
the
Calumet
/
Tri‐State
Trail.













1,250,000
 15
Gary IN Streets/Roads Ridge
Road,
Broadway
to
Grant
Street:
Project
will
reconstruct
this
por3on
of
Ridge
Road.

Ridge
Road
is
an

alterna3ve
arterial
roadway
to
the
Borman
Expressway.
This
request
will
help
finish
the
project.

City
is

currently
moving
forward
on
Broadway
ea 










9,000,000
 60
Gary IN Streets/Roads Lakefront
Marina
Access
Road,
Phase
2A,
Segment
3:
Project
is
to
construct
new
access
roadway
and
bridge

east
of
Center
Road.

Project
will
remove
extant
vehicular
access
challenges
to
the
lakefront
west
development

area.
 








10,500,000
 70
Gary IN Streets/Roads Department
of
Public
Work
&
Safety,


Pavement
Rehabilita3on
Including
Curb
and
Sidewalk
Replacement:
6th
District
‐
34
Streets;
5th
District
‐
34
Streets;
4th
District
‐
34
Streets;
3rd
District
‐
33
Streets;
2nd
District
‐

38
Streets;
1st
District
 








30,000,000
 85
Gary IN Transit GPTC
Financial
Computer
Systems
Update 












200,000
 2
Gary IN Transit GPTC
Fleet
Maintenance
Computerized
Systems 












200,000
 2
Gary IN Transit GPTC
Radio
Communica3on
Systems,
Radio
Towers.
Used
for
both
local
and
Regional
bus
routes
served
by
the

transporta3on
corpora3on. 












400,000
 4
Gary IN Transit GPTC
Fleet
Moderniza3on:
Request
is
for
the
purchase
of
6
full
size,
35
b
buses.
Each
new
bus
costs
$350,000

each. 










2,100,000
 18
Gary IN Water Gary
Sanitary
District:
Administra3on
Building
Improvements 












255,000
 1
Gary IN Water Gary
Sanitary
District:
Instrumenta3on
(SCADA)
and
security
(to
be
phased) 












500,000
 1
Gary IN Water Gary
Sanitary
District:
Removal
System 












500,000
 1
Gary IN Water Gary
Sanitary
District:
Sludge
Degrifers 












500,000
 1
Gary IN Water Gary
Sanitary
District:
Sewage
Pumps
Replacement 












765,000
 2
Gary IN Water Gary
Sanitary
District:
Rehabilita3on
of
the
Filter
Building. 








17,500,000
 4
Gary IN Water Gary
Sanitary
District:
Primary/intermediate
Clarifier
Drain
Valve
Replacements 










1,500,000
 5
Gary IN Water Gary
Sanitary
District:
Office
/
Administra3ve
Building
Upgrades 










2,900,000
 14
Gary IN Water Gary
Sanitary
District:
W.A.S
Thickening 










4,000,000
 14
Gary IN Water Gary
Sanitary
District:
Equaliza3on
Basin
(WWTP) 








15,251,000
 17
Gary IN Water Gary
Sanitary
District:
Cover
Replacements,
Explosion
Proof
Sump
Pumps,
Install
Dual
Flame
Arrestors,
Dual

Isola3on
Valves
on
Primary
Digesters,
High
level
alarm
failsafes
for
digesters,
Boiler
Replacement
Project 










4,530,000
 28
Gary IN Water Gary
Sanitary
District
building
upgrades 










7,500,000
 49
Gary IN Water Gary
Sanitary
District:
Digester
Improvements 








14,087,000
 55
Gary IN Water Gary
Sanitary
District:
Screening,
Grit
Removal
&
Pumping
Sta3on 








50,099,000
 65
Hammond IN CDBG 3rd
District
Street
Reconstruc3on
projects
(8
Streets)
work
to
include
storm,
sanitary,
and
water
main

infrastructure,
street
ligh3ng,
and
new
road
surface 










6,889,125
 200
Hobart IN CDBG Construct
new
Community/Senior
Center
to
replace
community
center
building
damaged
by
recent
flooding

that
can
not
be
rebuilt
in
its
current
loca3on
or
rehabbed.
 










3,000,000
 70
Hobart IN CDBG Conversion
of
former
Hobart
Middle
School
into
City
government
facility
to
house
Police
Department
and
City

Court 








10,000,000
 70
Hobart IN Energy Renova3on
of
exis3ng
City
Hall
to
include
energy
saving
technologies
such
as
new
HVAC
system,
energy

efficient
windows,
solar
power,
etc.
 










2,000,000
 50
Hobart IN Public
Safety Computer/Thinkpad
upgrades
to
Police
Vehicles
to
aid
in

communica3ons
between
and
among
law

enforcement
personnel/agencies 












120,000
 6
Hobart IN Public
Safety Purchase
10
E85
fueled
Police
vehicles
for
fleet
to
reduce
future
opera3onal
expenses 












200,000
 6
Hobart IN Public
Safety Hire
addi3onal
10
Police
Officers
to
bring
force
up
to
standards
for
community
size 












800,000
 10
Hobart IN Schools Fitness
track
installa3on
at
Hobart
Middle
School 












500,000
 10
Hobart IN Schools Replace
floors
and
roofs
at
four
Hobart
Elementary
Schools 










2,500,000
 40
Hobart IN Schools Construc3on
of
swimming
pool
at
Hobart
High
School 










7,000,000
 50
Hobart IN Schools Technology
Upgrades
at
four
Hobart
Elementary
Schools 










2,600,000
 80
Hobart IN Schools Installa3on
of
various
computer
technology
needed
at
Hobart
Middle
School 










1,200,000
 90
City State Program Project
Descrip3on Funding
Required Jobs
Hobart IN Streets/Roads Construc3on
of
Hobart's
Second
Phase
of
the
Oak
Savannah/Lake
George
Regional
Bike
Trail
which
serves
two

Northwest
Indiana
coun3es 












400,000
 8
Hobart IN Streets/Roads Colorado
Street
improvement/intersec3on
upgrade
from
US
30
south
to
City
limit
to
support
access
to
areas

available
for
industrial
development 










2,200,000
 30
Hobart IN Streets/Roads Installa3on
of
pre‐fab
pedestrian
bridge
&
construc3on
of
linking
bike/hike
trail
to
provide
access
to
two
parts

of
Fred
Rose
Park
separated
by
Lake
George;
part
of
the
larger
Oak
Savannah/Lake
George
trail
system
through

Hobart 










1,000,000
 30
Hobart IN Streets/Roads 69th
Avenue
reconstruc3on
from
Colorado
Street
to
Mississippi
Street
to
support
industrial
development

access 










6,000,000
 50
Hobart IN Streets/Roads West
Ridge
Road
(37th
Avenue)
widening/improvement
from
City
limit
to
I‐65
to
complete
Hobart's
sec3on
of

this
transporta3on
corridor
which
serves
as
an
I‐80/94
Borman
Expressway
reliever
for
local
traffic 












920,000
 50
Hobart IN Water Insituform
lining
of
exis3ng
City
sewers
to
extend
useful
life
of
infrastructure 










3,000,000
 10
Hobart IN Water Sewer
manhole
rehabilita3on
at
various
loca3ons
within
Hobart
Sanitary
District
territory 












500,000
 10
Indianapolis IN CDBG Con3nually
repair
and
replace
hardware,
irriga3on
and
materials
in
12
gardens
and
gateways,
including
1‐
70/Illinois,
West
Street
and
Capitol
Gateways. 












100,000
 1
Indianapolis IN CDBG Refurbish
poles
and
sign
boxes
of
10‐year
old
system.
Add
new
signs
as
needed. 












400,000
 2
Indianapolis IN CDBG Bike
Lanes 










1,000,000
 5
Indianapolis IN CDBG Traffic
Signal
System
Improvements 










1,000,000
 5
Indianapolis IN CDBG Local
Bridge
Rehabilita3ons 










1,500,000
 7
Indianapolis IN CDBG ADA
Ramp
Installa3ons 










2,000,000
 10
Indianapolis IN CDBG Alley
Program 










2,000,000
 10
Indianapolis IN CDBG Contractor
Crack
Sealing 










2,000,000
 10
Indianapolis IN CDBG Green
Infrastructure/Green
Street
Elements:
Money
would
be
used
to
fund
green
infrastructure
and
green

street
elements
in
currently
scheduled
transporta3on
projects.

As
new
infrastructure
and
transporta3on

elements
come
online,
we
need
to
include
money 










4,000,000
 10
Indianapolis IN CDBG Replace
and
reposi3on
200
planters.

Add
addi3onal
planters
in
key
areas. 










2,000,000
 10
Indianapolis IN CDBG Sidewalks
and
curbs 










3,000,000
 15
Indianapolis IN CDBG Street
lights
and
other
street
furniture,
including
newsbox
modulars;
Refurbish
or
replace
deteriorated.

Add

new
as
needed.











3,000,000
 15
Indianapolis IN CDBG Just
beyond
the
new
Lucas
Oil
Stadium,
streetscape
infrastructure
improvements
are
needed
from
Georgia
to

Morris
streets
and
from
Pennsylvania
to
West
streets
to
enhance
public
safety.

Specifically,
ligh3ng,
paving,

landscaping
and
sidewalks
need
to
be
 










5,000,000
 25
Indianapolis IN CDBG Opera3ons
Equipment
Purchases 










7,190,000
 35
Indianapolis IN CDBG The
Canal’s
Ohio
Street
and
Vermont
Street
Basins
and
other
infrastructure
have
deteriorated
and
need

replacement
or
significant
repair
in
order
to
maximize
this
world‐class
asset. 








10,000,000
 50
Indianapolis IN CDBG Top
30
Residen3als 










7,889,000
 50
Indianapolis IN CDBG Aber
30
years,
Monument
Circle
and
Market
Street
improvements,
including
brick
streets,
sidewalks,
street

trees,
electrical
conduit,
irriga3on,
pedestrian
ligh3ng,
banner
poles
and
benches
have
seriously
declined.

 








30,000,000
 150
Indianapolis IN CDBG Cultural
trail
bike
paths
and
pedestrian
ways. 








50,500,000
 150
Indianapolis IN CDBG Top
30
Thoroughfares 








28,475,000
 150
Indianapolis IN Energy Green
Building
Seed
Money:
In
order
to
increase
the
number
of
buildings
with
green
elements
and
LEED

cer3fied
buildings,
incen3ves
are
needed
to
encourage
the
increased
investment
of
developers
when
building

green/LEED
buildings.

An
increase
in
the
num 










2,000,000
 10
Indianapolis IN Energy Energy
audits
and
retrofits
on
all
City
owned
buildings;
Alterna3ve
energy
and
materials
in
city
processes;

Energy
efficient
ligh3ng
for
streetlights
and
traffic
lights;
Energy
efficient
vehicles
for
City
Fleets 










4,000,000
 20
Indianapolis IN Public
Safety AFIS
‐
automated
fingerprint
informa3on
system
‐
replacement 










1,252,808
 1
Indianapolis IN Public
Safety Shot
Spofers 












250,000
 1
Indianapolis IN Public
Safety Street
Cameras
 












600,000
 3
Indianapolis IN Transit Implement
Wellness
Plan
Ini3a3ves
‐
Design/reconfigure
facility
to
create
an
inhouse
employee
workout

facility,
obtain
workout
equipment,
cardiac
defibrillator,etc. 












250,000
 1
Indianapolis IN Transit Replace
ten
supervisor
vehicles
with
domes3c
hybrid
sedans
and
obtain
2
Segways
for
downtown
road

supervisors
use. 












600,000
 2
Indianapolis IN Transit Obtain
miscellaneous
shop
equipment
‐
including
automated
3re
pressure
reading
equipment,
nitrogen

generator,
brake
lathes,
bus
refridgera3on
maintenance
equipment,
computer
diagnos3c
equipment,
wheel

allignment
equipment,
3re
changing
equipment,
floo 










1,000,000
 3
Indianapolis IN Transit Rehab
bus
facility
flooring
and
plumbing,
drains,
etc. 










2,000,000
 6
Indianapolis IN Transit Rehab
bus
facility
grounds
‐
Expand
front
parking
lot,
resurface,
reseal
or
replace
exis3ng
parking
lots,
redo

landscaping
with
low
maintenance
plan3ngs,
replace
perimeter
fencing
and
ligh3ng
and
curbs
and
sidewalks. 










2,500,000
 8
Indianapolis IN Transit Rehab
bus
facility
ligh3ng
‐
replace
with
more
energy
efficient
ligh3ng
and
control
systems,
redo
maintenance

and
bus
cleaning
areas
with
more
work
conducive
ligh3ng. 










2,500,000
 8
Indianapolis IN Transit Replace
and
reconfigure
bus
libs
and
bus
exhaust
system
pursuant
to
the
facility
maintenance
plan. 










2,500,000
 8
Indianapolis IN Transit Replace
computer
hardware/sobware
‐
obtain/install
new
digital
telephone
system,
convert
to
new
blade

server
system,
replace
uninterupted
power
supplies
all
devices,
install
dedicated
electric
generator
with

automated
transfer
swith,
replace
desktop
comp 










3,000,000
 10
Indianapolis IN Transit Design
and
replace

HVAC
system
at
administra3on
and
maintenance
facility
at
1501
West
Washington
Street

pursuant
to
the
facility
maintenance
plan. 










6,000,000
 20
Indianapolis IN Water Sep3c
Tank
Elimina3on
Projects
for
sewer
improvements
and
elimina3on
of
sanitary
sewers. 








20,767,061
 90
Indianapolis IN Water Federal
consent
decree
projects
for
sewer
improvements. 








24,424,556
 120
Indianapolis IN Water Sanitary
sewer
master
plan
projects
and
rehabilita3on
of
system. 








33,624,466
 160
Kokomo IN CDBG Sidewalks
on
Apperson
Way
from
Bon‐Air
School
to
Smith
Road.
This
project
would
construct
an
8
foot
wide

sidewalk
to
allow
school
aged
children
to
safely
get
to
Bon‐Air
elementary
and
middle
school. 














50,000
 2
Kokomo IN CDBG Sidewalk
Reconstruc3on
on
Elm
Street
from
Washington
Street
to
Lindsay
Street.
This
project
would

reconstruc3on
very
poor
sidewalks
in
a
neighborhood
with
several
pedestrian
friendly
des3na3ons,
including

churches,
schools,
and
convenience
stores. 












300,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
Kokomo IN CDBG Sidewalk
Reconstruc3on
on
Taylor
Street
from
Delphos
Street
to
Calumet
Street.
This
project
would
replace

4,000
feet
of
sidewalks
on
a
major
route
for
students
that
walk
to
school. 












300,000
 4
Kokomo IN CDBG Reconstruc3on
of
Waugh
Street
from
North
Street
to
Lordeman
Street.
This
project
would
reconstruct
this

1,300
foot
por3on
of
Waugh
Street
and
provide
new
curb
and
gufer,
sidewalk,
and
significant
drainage

improvements. 












360,000
 5
Kokomo IN CDBG Sidewalk
Reconstruc3on
on
Broadway
from
Washington
Street
to
Philips
Street.
This
project
would

reconstruc3on
very
poor
sidewalks
in
a
neighborhood
with
several
pedestrian
friendly
des3na3ons,
including

churches,
schools,
and
convenience
stores. 












400,000
 5
Kokomo IN CDBG Reconstruc3on
of
Gerhart
Street
from
Apperson
Way
to
Locke
Street.
This
project
would
lower
Gerhart
Street

and
add
new
storm
drainage,
curb
and
sidewalks
near
Bon‐Air
Elementary
and
Middle
School. 












450,000
 6
Kokomo IN CDBG Reconstruc3on
of
Jay
Street
from
North
Street
to
Lordeman
Street.
This
project
would
add
new
storm
sewer,

curb,
sidewalk,
and
asphalt
pavement
to
Jay
Street.

This
project
would
improve
the
pedestrian
accessibility
to

the
neighborhood,
as
well
as
improve 












500,000
 7
Kokomo IN CDBG Owner
Occupied
Rehab
Grants 












300,000
 10
Kokomo IN CDBG Reconstruc3on
of
Park
Avenue
from
McCann
Street
to
Washington
Street,
including
new
curb,
sidewalk
and

pavement,
to
improve
pedestrian
access
to
the
city's
public
aqua3c
center,
improve
drainange
and
water

quality
and
revitalize
the
neighobhood. 










1,000,000
 12
Kokomo IN CDBG Sewage
extension
to
Darrough
Chappel
subdivision,
a
densely‐populated,
unsewered
area 












900,000
 12
Kokomo IN CDBG Water
lines
to
Darrough
Chappel
subdivision,
a
densely‐populated
area 












900,000
 12
Kokomo IN Energy K‐Fuel
project
to
recycle
cooking
into
into
a
biodiesel
fuel
used
to
power
the
city's
diesel
fleet. 














50,000
 80
Kokomo IN Housing Upgrade
all
internal
plumbing
at
Terrace
Tower. 












150,000
 5
Kokomo IN Housing Upgrade
emergency
generators
at
2
elderly
high
rises
(Civic
Center
Tower
and
Terrace
Tower). 












200,000
 5
Kokomo IN Housing Upda3ng
and
replacement
of
trash
compactor
systems
at
2
elderly
high
rises
(Civic
Center
Tower
and
Terrace

Tower). 












150,000
 8.5
Kokomo IN Housing Elevator
upgrades
for
2
elderly
high
rises
(Civic
Center
Tower
and
Terrace
Tower)
entailing
2
elevators
at
each

building. 












150,000
 10
Kokomo IN Housing Roof
Top
HVAC
system
at
Terrace
Tower 














50,000
 12
Kokomo IN Housing Sidewalk,
roadway
and
pa3o
replacement
for
all
developments
and
40
Scafered
Site
houses. 












500,000
 12.5
Kokomo IN Housing Roof
replacement
for
16
Scafered
Site
houses
(24
have
already
been
completed). 














80,000
 22.5
Kokomo IN Housing Boiler
Replacement
at
Garden
Square
Family
Development.

This
entails
3
steam
pressure
Boilers. 












375,000
 25
Kokomo IN Housing Conversion
of
Gas
ranges
to
Electric
ranges
at
Garden
Square
Apartments
for
167
of
175
units
(8
are

completed). 












350,000
 25
Kokomo IN Housing Security
System
for
2
elderly
high
rises
(Civic
Center
Tower
and
Terrace
Tower),
this
includes
exterior
door

security
for
the
buildings
and
visual
access
for
each
tenant
from
their
individual
unit. 












500,000
 30
Kokomo IN Public
Safety Public
Safety
Storage
Facility 










3,000,000
 25
Kokomo IN Schools Peqt
Park
Elementary 










1,500,000
 20
Kokomo IN Schools Elwood
Haynes
Elementary 










2,500,000
 30
Kokomo IN Schools Memorial
Gym 










2,500,000
 30
Kokomo IN Schools Sycamore
Elementary 










2,500,000
 30
Kokomo IN Schools Darrough
Chapel
Early
Childhood
Center 










3,000,000
 40
Kokomo IN Schools Moderniza3on
of
Maple
Cres
Middle 










3,000,000
 40
Kokomo IN Schools Washington
Alterna3ve
School 










3,000,000
 40
Kokomo IN Schools Bon
Air
Elementary 










4,000,000
 50
Kokomo IN Schools Lafayefe
Park
Elementary 










4,000,000
 50
Kokomo IN Schools Boulevard
Elementary 








12,000,000
 150
Kokomo IN Schools Kokomo
High
School 








20,000,000
 260
Kokomo IN Schools Moderniza3on
of
Central
Middle
School.
This
historic
facility,
located
in
the
heart
of
downtown
Kokomo,
has

been
chosen
as
the
new
site
of
Kokomo‐Center
School
Corpora3on's
administra3on
offices,
as
well
as
an

expanded
middle
school.
HOwever,
there
are 








35,000,000
 526
Kokomo IN Transit Implementa3on
of
a
a
small
scale
fixed
route
transit
system. 










1,555,000
 9
Kokomo IN Water Ohio
Street
Storm
Sewer
Project.
This
project
would
separate
a
large
amount
of
sewers
on
the
near
east
side
of

the
city,
reducing
combined
sewer
overflows
and
improving
drainage
in
a
very
urban
area. 












500,000
 7
Kokomo IN Water Storm
Sewer
Construc3on
on
Brandon,
King
and
Harrison
Streets
from
Brandon
Street
to
Buckeye
Street.
This

project
would
include
a
new
storm
sewer
system
on
Brandon
Street,
Courtland
Avenue,
King
Street,
and

Harrison
Street
for
the
purpose
of
separa3ng
t 










1,050,000
 14
Kokomo IN Water West
Sycamore
Street
Sewer
Extension
Project.
This
project
will
serve
a
developing
commercial
area
with

sanitary
sewer
service.

Approximately
20
jobs
are
depending
on
this
project
to
be
completed
in
2009. 












400,000
 25
Kokomo IN Water Boulevard
Sanitary
Sewer
Extension
Project.
This
project
would
extend
sanitary
sewer
service
to
an
area
with

tremendous
economic
development
poten3al
due
to
the
construc3on
of
the
new
US31
freeway
in
Kokomo.


Boulevard
Street
is
a
major
connector
to
the 










3,000,000
 40
Kokomo IN Water Carter
Street
Sanitary
Sewer
Extension
Project.
This
project
would
extend
sanitary
sewer
service
to
an
area

with
tremendous
economic
development
poten3al
due
to
the
construc3on
of
the
new
US31
freeway
in

Kokomo.

US35
will
be
undergoing
a
complete
recon 










4,000,000
 52
Kokomo,
IN IN Public
Safety Construc3on
of
new
3
Bay
Fire
Sta3on
#2 










1,500,000

Kokomo,
IN IN Public
Safety Construc3on
of
new
3
Bay
Fire
Sta3on
#7 










1,500,000

Kokomo,
IN IN Streets/Roads Boulevard
Upgrade
(Goyer
Road
to
new
US31) 










5,100,000

Kokomo,
IN IN Streets/Roads Dixon
Road
Upgrade
(St.
Rd
22
to
Judson
Road) 










8,500,000

Kokomo,
IN IN Streets/Roads Washington
&
LaFountain
Upgrade 










1,150,984

Kokomo,
IN IN Water 40
MGD
CSO
Wet
Weather
Treatment
Facility 










8,200,000

Kokomo,
IN IN Water Highland
Park
Constructed
Wetlands
for
CSO
Treatment
 










1,450,000

Kokomo,
IN IN Water Markland
Quarry
Rain
Garden 












500,000

Lake
Sta3on IN CDBG Sta3on
#2
fire
sta3on
new
bay
3
drive
through
sta3on
with
sleep
quarters,
offices,
lounge,
washrooms,
and

training
room 










2,500,000
 8
Lake
Sta3on IN CDBG Upgrade
and
replace
exis3ng
guardrail
systems
for
safety
requirements. 












250,000
 8
City State Program Project
Descrip3on Funding
Required Jobs
Lake
Sta3on IN CDBG 25th
Avenue
Area
Drainage
Installa3on
of
Storm
Sewers. 












404,500
 10
Lake
Sta3on IN CDBG 25th
Avenue
Area
Sidewalk
Restora3on
Installa3on
and
replacement
of
sidewalks
including
ADA
accessibility. 












465,000
 12
Lake
Sta3on IN CDBG 25th
Avenue
Area
Street
Reconstruc3on

Installa3on
of
Curbs,
Gufers,
Paving. 










1,435,000
 22
Lake
Sta3on IN CDBG All
other
parks:
Fences
installed,
shelters
installed,
fitness
equipment
and
signage 












143,000
 22
Lake
Sta3on IN CDBG Fire
department
fixed
training
facility
for
training
of
its
firefighters. 










1,780,000
 28
Lake
Sta3on IN CDBG Storm
water
flood
control
preven3on
plan
along
Deep
River
on
the
west
end
of
the
City
of
Lake
Sta3on
from

Liverpool
Road
to
180/94. 










2,920,000
 44
Lake
Sta3on IN CDBG Mul3purpose/Baseball
Complex‐baseball,
soccer,
track,
trails,
building,
roads,
parking
lots
and
infrasturcture. 










1,400,000
 62
Lake
Sta3on IN CDBG Riverview
Park‐Recrea3onal
ameni3es
to
include;
tennis
courts,
basketball
courts,
shelters,
band
shell,
and
ice

rink.

Infrastructure
improvements
to
include;
roads,
parking
lots,
pole
barn,
shelter,
building
repairs
and
park

tables
and
receptacles. 












996,000
 147
Lake
Sta3on IN CDBG New
Government
Complex
‐
Fire
Sta3on
w/
Gold
LEED
Cer3fica3on 










1,900,000
 196
Lake
Sta3on IN CDBG New
Government
Complex
‐
Police
Sta3on
w/
Gold
LEED
Cer3fica3on 










2,050,000
 196
Lake
Sta3on IN Energy Installa3on
of
energy
efficient
LED
street
ligh3ng
system
in
Riverwalk
neighborhood. 












149,500
 6
Lake
Sta3on IN Energy Installa3on
of
energy
efficient

street
ligh3ng
system
using
LED
technology
in
the
downtown
Central
Avenue

district. 










1,985,000
 28
Lake
Sta3on IN Energy Installa3on
of
energy
efficient
area
ligh3ng
system
using
LED
technology
for
the
new
Government
Complex

(Gold
LEED
Cer3fica3on). 












200,000
 30
Lake
Sta3on IN Energy Treatment
of
Storm
Water
at
New
Government
Complex
(Gold
LEED
Cer3fica3on) 












330,000
 30
Lake
Sta3on IN Energy New
Municipal
Building
‐Geothermal
HVAC
(Gold
LEED
Cer3ficated) 












500,000
 45
Lake
Sta3on IN Energy Wind
Turbines
for
New
Government
Complex
(Gold
LEED
Cer3fica3on) 












450,000
 45
Lake
Sta3on IN Energy 4600
recycle
bins,
1
recycle
rearload
truck,
and
route
sobware
for
recycling
program 












385,000
 67
Lake
Sta3on IN Public
Safety (2)
School
Resource
officers
for
2
high
schools
within
our
city 












200,000
 2
Lake
Sta3on IN Public
Safety Hire
and
train
two
new
Environmental
Resource
Officers
to
enforce
new
environmental
water
wastewater
and

storm
drainage
ordinances.
Also
to
provide
in
school
training
for
students,
residents,
contractors
and

developers.
NPDES
and
NPDESII
compliance. 














89,000
 2
Lake
Sta3on IN Public
Safety Lake
Sta3on
Fire
Mobile
command
vehicle
for
hazmat
&
WMD
response.

Mul3
purpose
command
vehicle 














95,000
 3
Lake
Sta3on IN Public
Safety (1)
Incident
command
vehicle
with
cad
dispatch,
video
surv.

and
comm.
network 












425,000
 4
Lake
Sta3on IN Public
Safety Drug/Gang
task
force
unit
assigned
to
inves3gate
organiza3ons
and
individuals
involved
in
gangs
and
the

distribu3on/u3liza3on
of
illegal
narco3cs. 












376,000
 4
Lake
Sta3on IN Public
Safety Gps
sta3on
with
laser
measuring
instrument
for
crime
and
accident
scene
analysis 














20,000
 4
Lake
Sta3on IN Public
Safety Replacement
of
28
yr
old
fire
truck.
Purchase
of
90
foot
aerial
ladder
truck 










1,200,000
 4
Lake
Sta3on IN Public
Safety (10)
automated
license
plate
system
to
check
for
stolen/wanted
vehicle
on
major
highways
and
city
streets 












150,000
 5
Lake
Sta3on IN Public
Safety (2)
addi3onal
K‐9
units
for
Police
Sta3on 












150,000
 5
Lake
Sta3on IN Public
Safety ambulance
sta3on
sobware
for
report
wri3ng 















5,000
 5
Lake
Sta3on IN Public
Safety New/Replacement
of
undercover
and
surveillance
equipment
to
assist
officers
with
the
detec3on
and

prosecu3on
of
defendants 












125,000
 5
Lake
Sta3on IN Public
Safety Purchase
of
25
tasers
for
officers 














22,500
 5
Lake
Sta3on IN Public
Safety Purchase
two
emergency
warning
siren
systems
for
inciement
weather
&
special
alerts 












320,000
 5
Lake
Sta3on IN Public
Safety EMS
Portable
to
communicate
with
police
and
fire
dept. 















8,880
 6
Lake
Sta3on IN Public
Safety the
purchase
of
an
automated
fingerprint
iden3fica3on
system
that
will
allow
techs
to
direct
query
both
the

indiana
and
FBI
fingerprint
database
for
suspects
fingerprints
that
are
leb
on
scene. 












150,000
 6
Lake
Sta3on IN Public
Safety New
Roof
to
replace
roof
leeks
and
broken
3les
inside
ambulance
sta3on 














25,000
 8
Lake
Sta3on IN Public
Safety (20)
Dash
mounted
in‐car
video
systems
to
be
u3lized
for
the
documenta3on
of
evidence
as
well
as
record
the

communica3on
between
officers
and
ci3zens. 












100,000
 10
Lake
Sta3on IN Public
Safety 30
Portable
defibrillator
that
would
be
placed
in
every
police
car
and
at
the
police
sta3on.

The
defibrillators

could
save
someone's
life
who
would
be
suffering
from
Sudden
Cardiac
Arrest. 












150,000
 10
Lake
Sta3on IN Public
Safety Physio
life
Pak
12
Cardiac
Monitors 












112,000
 10
Lake
Sta3on IN Public
Safety Police
5‐lane
indoor
firing
range
with
noise
afenua3on
that
would
be
available
to
other
local
law
enforcement

agencies. 












665,000
 10
Lake
Sta3on IN Public
Safety Sobware
enhancements
for
dispatch,
emergency
911,
reports,
and
gps 












232,770
 10
Lake
Sta3on IN Public
Safety Training
Room/Av
upgrade/
supplies
room
need
upgrades
ambulance 














20,000
 10
Lake
Sta3on IN Public
Safety Ani‐Alli
system
For
Cad
for
ambulance
dispatch. 














50,000
 15
Lake
Sta3on IN Public
Safety Protec3ve
equipment
protec3ve
gear
hazmat 












180,000
 15
Lake
Sta3on IN Public
Safety October
fire
preven3on
program.
1600
school
children
visi3ng
7
schools
to
conduct
fire
preven3on
and
drills 














47,120
 18
Lake
Sta3on IN Public
Safety New
ambulance
to
replace
1993
ambulance
which
is
con3nuosly
breaking
down 












160,000
 20
Lake
Sta3on IN Public
Safety Op3coms
for
safety
to
protect
EMS
and
Civilians 














40,000
 20
Lake
Sta3on IN Public
Safety Video
Backup
system
for
ambulance
sta3on 














20,000
 20
Lake
Sta3on IN Public
Safety Mul3
hazard
preven3on
program.

Fire
preven3on
to
educate
young
children
and
senior
adults
fire
preven3on

and
safety 












440,639
 25
Lake
Sta3on IN Streets/Roads Liverpool
Road
Pavement
resurfacing
of
irregular
pavement,
install
curb
and
gufers,
sidewalks,
crosswalks
and

ADA
access
as
required.
Installa3on
of
new
street
drainage
systems. 










3,233,000
 52
Lake
Sta3on IN Streets/Roads 2009
Resurface
Program 












825,000
 55
Lake
Sta3on IN Streets/Roads New
ADA
Compliant
Curb
Ramps
at
80
Intersec3ons 










2,025,000
 55
Lake
Sta3on IN Streets/Roads Central
Avenue
Transporta3on
Enhancement
Project
Phase
I
Reconstruc3on
of
irregular
pavement,
install
curb
and
gufers,
sidewalks,
crosswalks
and
ADA
access.


Installa3on
of
new
street
drainage
system. 










6,400,000
 150
Lake
Sta3on IN Water Installa3on
and
monitoring
of
sanitary
sewer
system
at
6
key
flow
loca3ons. 












156,000
 5
Lake
Sta3on IN Water Upgrade
of
lib
sta3on
#5
electrical
and
metering
due
to
age
and
outdated
equipment. 












260,000
 7
City State Program Project
Descrip3on Funding
Required Jobs
Lake
Sta3on IN Water Municipal
Storm
Sewer
and
Drainage
Systems
Improvements
Area
wide
storm
sewer
outlet
repairs
and
open
channel
restora3on. 












335,000
 8
Lake
Sta3on IN Water Repair
and
replace
flow
structure
Manhole
on
Interceptor
at
Montgomery
and
Fairview. 














44,000
 8
Lake
Sta3on IN Water Installa3on
of
emergency
bypass
pumping
systems
at
18
lib
sta3on
sites. 












360,000
 10
Lake
Sta3on IN Water Remove
and
replace
the
electrical
control
systems
at
12
lib
sta3on
sites
due
to
aging
and
obsolete
equipment. 












960,000
 10
Lake
Sta3on IN Water Replacement
of
lib
sta3on
#7
due
to
age
and
overflow
issues. 












440,000
 10
Lake
Sta3on IN Water Fire
Hydrant,
Water
Main
Isola3on
Valve
Replacement
Program
and
Well
improvements.

Replace
broken
and
non‐working
fire
hydrants.
Replace
broken
and
inoperable
isola3on
valves.

Rehabilitate

exis3ng
potable
water
wells. 












635,000
 12
Lake
Sta3on IN Water Replacement
of
lib
sta3on
#2
due
to
age
and
outdated
equipment. 












535,000
 12
Lake
Sta3on IN Water Water
Well
and
Filter
Improvements
Installa3on
of
two
new
water
wells
with
filters
and
pressure
booster
systems. 












460,000
 12
Lake
Sta3on IN Water Internal
inspec3on
team
and
camera
truck
to
monitor
the
city's
sanitary
and
storm
sewers.
Exis3ng
system
is

very
old
and
requires
frequent
repairs
and
maintenance 












320,000
 15
Lake
Sta3on IN Water Repair
and
repaint
water
tower,
upgrade
and
install
new
control
system,
al3tude
valve
and
alarm. 












935,000
 19
Lake
Sta3on IN Water Replace
aging
and
deteriorated
Sanitary
Interceptor
Sewer. 












795,000
 22
Lake
Sta3on IN Water Installa3on
of
Central
Avenue
and
Grand
Blvd.
Relief
drainage
system. 










1,075,000
 24
Lake
Sta3on IN Water Backup
power
for
four
(4)
wells. 












200,000
 30
Lake
Sta3on IN Water Replacement
of
three
(3)
exis3ng
lib
sta3ons
and
metering
equipment
due
to
age
and
outdated
equipment. 












750,000
 30
Lake
Sta3on IN Water Remove
and
replace
aging
and
obsolete
water
meters. 










1,400,000
 48
Lake
Sta3on IN Water Repairs
to
Exis3ng
Pump
Houses 












240,000
 60
Lawrence IN CDBG Mardyke‐Edlou
Streets
Drainage
 














50,000
 4
Lawrence IN CDBG Indian
Lake
Blvd.
West
‐
Drainage
Project 














95,000
 8
Lawrence IN CDBG Old
Orchard
Drainage
Project 














50,000
 8
Lawrence IN CDBG Thunderbird
Road
Drainage
 












150,000
 10
Lawrence IN CDBG Allen‐Sellars‐Hull
Streets
Drainage
 












190,000
 12
Lawrence IN CDBG Jenn
Park
Building
Rennova3on 












150,000
 12
Lawrence IN CDBG Paradise
Drainage
Project 














75,000
 12
Lawrence IN CDBG Skate
park
restroom
and
ammeni3es 














80,000
 14
Lawrence IN CDBG Richart
‐
Hartman
Avenues
Drainage 












670,000
 15
Lawrence IN CDBG 46th
‐
50th
Streets
and
Richart
Avenue
‐
Hartman
Avenue
 












200,000
 18
Lawrence IN CDBG Richart
Street
Curb
and
Sidewalk 












200,000
 18
Lawrence IN CDBG Richart
Street
Curb,
Sidewalk,
Drainage













200,000
 18
Lawrence IN CDBG Sellers
Area
Development 












325,000
 18
Lawrence IN CDBG Renovate
Community
Center
on
Franklin
Street 












195,000
 20
Lawrence IN CDBG Sidewalks/Curb
Replacement/Repair 












240,000
 20
Lawrence IN CDBG 52nd
Street
Re‐alignment 












475,000
 38
Lawrence IN CDBG Franklin
Road/Hess
Road
Resurface
Project 












280,000
 38
Lawrence IN CDBG Renovate
Sterref
Center 












300,000
 38
Lawrence IN CDBG Resurface
Sunnyside
Street 












350,000
 42
Lawrence IN CDBG Street
Resurfacing
(General) 










1,250,000
 60
Lawrence IN CDBG 59th
Street
‐
Street
Department
 










1,300,000
 120
Lawrence IN Energy Energy
Retrofit
of
the
City
Government
Center 














75,000
 6
Lawrence IN Energy Energy
Efficient
Windows
in
Government
Buildings 












100,000
 16
Lawrence IN Energy Installa3on
of
LED
Street
Ligh3ng
at
Government
Complex 












350,000
 20
Lawrence IN Energy Installa3on
of
LED
Street
Ligh3ng
in
Lawrence
Proper 












950,000
 30
Lawrence IN Energy Solar
Panels
on
City
Government
Buildings
+
Energy
Retrofits 












525,000
 38
Lawrence IN Energy LED
Ligh3ng

at
Community
Center,
Jenn,
Alexander
and
Skate
parks 












350,000
 40
Lawrence IN Water Clinton
Street
Lib
Sta3on
rehab 












100,000
 10
Lawrence IN Water Oaklandon
Road
Tower
rehabilita3on 












150,000
 10
Lawrence IN Water Edlou
Lib
Sta3on
Rehab 












150,000
 12
Lawrence IN Water 52nd
Street
Tower
rehabilita3on 












350,000
 14
Lawrence IN Water Richardt
Street
Tower
rehabilita3on 












400,000
 14
Lawrence IN Water 47th
Street
Water
Main
Project
(abandon
old
4") 












150,000
 15
Lawrence IN Water Hartman
Drive
water
main
replacement
(46th
to
47th) 














75,000
 18
Lawrence IN Water Sadlier
Street
water
main
replacement
(46th
to
47th) 














75,000
 18
Lawrence IN Water Hermosa
Drive
Lib
Sta3on
reloca3on 












300,000
 20
Lawrence IN Water Maple
Lane
water
main
replacement 












100,000
 20
Lawrence IN Water Indian
Lake
Road
water
plant
upgrades 












400,000
 30
Lawrence IN Water Brookhaven
water
main
replacement
(neighborhood
wide) 










1,500,000
 32
Lawrence IN Water Harrison
Park
water
main
replacement
(neighborhood
wide) 












750,000
 32
Lawrence IN Water Richardt
Street
water
treatment
plant
upgrades 










2,000,000
 35
Lawrence IN Water Fort
Harrison
Water
Plant
rehabilita3on 










3,500,000
 60
Lawrence IN Water Sanitary
Sewer
Main
Rehabilita3on
(system
wide) 










2,500,000
 100
Merrillville IN Streets/Roads New
stop
Signs 















2,500
 0.01
Merrillville IN Streets/Roads LED
Lights
in
Exis3ng
Traffic
Signals 














10,000
 0.3
Merrillville IN Streets/Roads Chase
St.
drainage
Improvements 














25,000
 0.8
Merrillville IN Streets/Roads 73rd
Ave.
Drainage
Improvements 














75,000
 2.5
Merrillville IN Streets/Roads Historic
District
streetscape
Improvements 












100,000
 3.3
Merrillville IN Streets/Roads Marshall
St.
Drainage
Improvements
from
US
30
to
73rd
St. 












125,000
 4.2
Merrillville IN Streets/Roads 61st
St.
Widening
Project 












150,000
 5
Merrillville IN Streets/Roads 80th
Place
&
Braodway
Intersec3on
Improvements 












150,000
 5
Merrillville IN Streets/Roads Tab
&
Rutledge
Drainage
Improvements,
Phase
2 












150,000
 5
Merrillville IN Streets/Roads Harms
Road
Resurfacing 












300,000
 10
Merrillville IN Streets/Roads Marcella
Road
Improvements 












300,000
 10
Merrillville IN Streets/Roads Colorado
St.
Resurfacing 












350,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Merrillville IN Water Tab
Street
Interceptor
Sanitary
Sewer 










1,200,000
 25
Merrillville IN Water Rehablita3on
of
Sanitary
Sewers
in 










1,500,000
 30
Michigan
City IN CDBG Elston
Grove
‐
rebuild
streets,curbs,gufers,sidewalks
and
replace
sanitary
sewers 








11,100,000
 40
Michigan
City IN CDBG Eastport
Area
Improvements
‐
streets/walks/curbs 










3,000,000
 45
Michigan
City IN CDBG West
Side
Improvements
‐
streets,walks,curbs 










3,500,000
 45
Michigan
City IN CDBG Lafayefe‐Barker
Phase
D,E,F
&
I
‐separate
combined
sewers
by
installing
new
storm
sewers;
rebuild

streets,curbs,gufers
and
sidewalks 








12,300,000
 50
Michigan
City IN Streets/Roads West
Beach
Access:
project
to
provide
access
to
Lake
Michigan
from
the
west
side
of
Michigan
City
&

par3cularly
a
residen3al
neighborhood 










1,000,000
 12
Michigan
City IN Streets/Roads Michigan
Boulevard
Project:
milling,
paving,
drainage,
curb
replacement
&
sidewalks 










3,000,000
 45
Michigan
City IN Streets/Roads Coolspring
Avenue:
reconstruc3on
&
widening
of
a
heavily
traveled
east/west
route 










2,000,000
 48
Michigan
City IN Streets/Roads Ohio
Street:
Reconstruc3on
of
a
major
north/south
route 










6,000,000
 48
Michigan
City IN Water Henry
Street
Lib
Sta3on:
relocate
and
rebuild
sanitary
sewer
lib
sta3on 










1,000,000
 10
Michigan
City IN Water Kimball
Woods
Lib
Sta3on:
rebuild,
add
grinder
pumps
and
standby
generator 












200,000
 10
Michigan
City IN Water Lake
Avenue
Lib
Sta3on:
rebuild
sanitary
sewer
lib
sta3on 












300,000
 10
Michigan
City IN Water Electrical
switchgear
at
M.C.
Water
Plant
‐
replace
electrical
switchgear 










2,000,000
 12
Michigan
City IN Water New
Eastwood
Storage
Tank 










2,000,000
 12
Michigan
City IN Water Clark
Lib
Sta3on
‐replacement
of
lib
sta3on 












350,000
 20
Michigan
City IN Water E
Street
Siphon
replacement 












750,000
 20
Michigan
City IN Water Lafayefe‐Barker
Storm
Sewer
Interceptor:
provide
storm
sewer
interceptor
backbone
for
large
area
urban

combined
sewer
separa3on
&
rebuild
Lafayefe
Street 








18,600,000
 20
Michigan
City IN Water Southgate
Wastewater
Improvements:
rebuild
sanitary
sewer
lib
sta3on
&
redirect
flow
to
new
sanitary
sewer

trunk
line. 










1,000,000
 20
Michigan
City IN Water Greenwood
Ave
Storm
Sewer
replacement:
replace
storm
sewer 










1,000,000
 45
Mishawaka IN CDBG Lynn
Street
Improvements
(Borley
‐
Mckinley)
Construc3on
of
Curbs,
Sidewalks,
Storm
Sewer
and
Pavement 












975,000
 23
Mishawaka IN Public
Safety Twenty
(20)
ML
900
Mobile
Laptops
for
assigment
to
police
department
field
officers. 












100,000
 0
Mishawaka IN Public
Safety School
Resource
Officers
in
Middle
and
High
School
plus
associated
equipment 












175,000
 2
Mishawaka IN Streets/Roads Main
Street
Improvement
Project
Phase
I
(Mishawaka
Avenue
‐
Bafell)

Added
Travel
Lanes 










1,775,250
 39
Mishawaka IN Streets/Roads Main
Street
Improvement
Project
Phase
IV
(Donaldson
‐
McKinley)
Added
Travel
Lanes 










3,380,000
 70
Mishawaka IN Water Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"B",
Div
III
(Frank
Park
‐
Park
Place)
700
lf
of
24"
FM 












365,400
 10
Mishawaka IN Water Judy
Creek
Forcemian
Replacement
Project
(Clay
‐
Lowell)
1200
lf
18"
FM 












367,650
 10
Mishawaka IN Water Northwest
Trunk
Gravity
Sewer
CIPP
Lining
Project
(Marion
St.
‐
Wilson
Blvd.)
3000
lf
36"
lining 












875,500
 21
Mishawaka IN Water Twelbh
Street
Sanitary
Sewer
Reloca3on
Project
(Ninth
‐
Twelbh)
1500
lf
27"
gravity
sewer
reloca3on
due
to

SR
331
Constr. 












975,000
 23
Mishawaka IN Water Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"C"
(Park
Place
‐
Catalpa
Drive)
1240
lf
of
24"
FM 












625,600
 24
Mishawaka IN Water Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"E"
(McKinley
‐
Jefferson)
2380
lf
of
24"
FM 










1,115,700
 25
Mishawaka IN Water Holy
Cross
Parkway
Pump
Sta3on
Building
and
Site
Improvements 










1,250,500
 30
Mishawaka IN Water Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"F"
(Jefferson
‐
Mishawaka
Ave.)
2550
lf
of
24"
FM 










1,275,300
 30
Mishawaka IN Water Milburn
Area
Sewer
Improvement
Project
Division
"B"
(Southwest
I)
LTCP
Element
‐
sewer
separa3on
and

sewer
lining 










1,950,250
 42
Mishawaka IN Water New
River
Crossing
&
580
lf
of
Gravity
Sewer
(Mishawaka
Ave.
‐
Front
Street) 










1,952,500
 42
Mishawaka IN Water Milburn
Area
Sewer
Improvement
Project
Division
"D"
(Southwest
II)
LTCP
Element
‐
sewer
separa3on
and

sewer
lining 










2,912,485
 60
Mishawaka IN Water Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"D"
(Catalpa
Drive
‐
McKinley)
6350
lf
of
24"
FM 










3,057,400
 64
Mishawaka IN Water Milburn
Area
Sewer
Improvement
Project
Division
"E"
(Dale
Avenue)
LTCP
Element
‐
sewer
separa3on
and

sewer
lining 










3,356,844
 70
Mishawaka IN Water Milburn
Area
Sewer
Improvement
Project
Division
"G"
(River
Avenue)
LTCP
Element
‐
sewer
separa3on
and

sewer
lining 










3,477,050
 72
Mishawaka IN Water Milburn
Area
Sewer
Improvement
Project
Division
"F"
(Eastern
Phase)
LTCP
Element
‐
sewer
separa3on
and

sewer
lining 










4,224,394
 87
Mishawaka IN Water Milburn
Area
Sewer
Improvement
Project
Division
"H"
(Central)
LTCP
Element
‐
sewer
separa3on
and
sewer

lining 










4,522,970
 93
Muncie IN Airport Corporate
Hangar 










3,000,000

Muncie IN Airport Relocate
Apron,
11000
sy 










1,500,000

Muncie IN Airport Runway
14‐32
Overlay 










8,900,000

Muncie IN Airport Self‐fueling
system 












100,000

Muncie IN Airport Standby
Engine
Generator,
250KW 












100,000

Muncie IN Airport Taxiway
B
Lights 












400,000

Muncie IN CDBG Addi3on
of
public
park
in
north
side
of
city 










3,000,000

Muncie IN CDBG Heekin
Park
revitaliza3on
including
replacing
mowed
areas
with
grasses
that
do
not
require
mowing 












250,000
 6
Muncie IN CDBG Thomas
Park
revitaliza3on
including
replacing
mowed
areas
with
grasses
that
do
not
require
mowing. 












150,000
 6
Muncie IN CDBG McCullough
Park
revitaliza3on
including
replacing
mowed
areas
with
grasses
that
do
not
require
mowing. 












350,000
 12
Muncie IN CDBG Reconstruc3on
of
Tuhey
Pool‐public
parks
pool 










2,000,000
 15
Muncie IN CDBG Road
paving
and
sidewalks
for
low
to
moderate
income
level
neighborhoods 








15,000,000
 35
Muncie IN Energy Energy
Retrofit
for
all
city
government
buildings 










4,000,000

Muncie IN Energy Retrofit
380
municipal
roadway
lights
with
high‐eficiency
LED
fixtures 












250,000

Muncie IN Energy Retrofit
all
traffic
signals
with
high‐efficiency
LED
fixtures 















1,000

Muncie IN Housing Gillespie
Towers
(Senior
Apartment
High‐Rise)
Exterior
Window
Replacement
(Energy
Efficiency)
HVAC
Upgrade
to
achieve
energy
efficiency.


Replace
exisi3ng
boilers
and
related
mechanical
equipment.
Main
Lobby
Renova3on
and
new
ves3bule 












850,000
 7
City State Program Project
Descrip3on Funding
Required Jobs
Muncie IN Housing Parkview
Apartments
Demoli3on
New
insfrastructure
for
tax
credit
project
Community
building
and
site
ameni3es 










1,450,000
 12
Muncie IN Housing Earthstone
Terrace
&
Southern
Pines
Housing
Site
infrastructure
and
public
improvements
Emergency
health
and
safety
systems
New
energy
efficient

doors
and
window
systems
New
energy
efficient
HVAC
systems
ADA
accessibility
modifica3ons
and
improveme 










3,800,000
 24
Muncie IN Public
Safety 10
SWAT
vests
and
30
ballis3c
shields 














72,000

Muncie IN Public
Safety 100'‐110'
plazorm
aerial
truck
to
replace
1970
re3red
verson 












850,000

Muncie IN Public
Safety 127'
ladder
truck
to
replace
1983
version 












800,000

Muncie IN Public
Safety 15
in
car
radios
and
30
officer
radios
for
interoperability 












144,000

Muncie IN Public
Safety 75'‐85'
Sutphen
Quint
to
replace
1986
version 












600,000

Muncie IN Public
Safety Computers,
sobware
and
servers
for
inhouse
and
vehicles 












240,000

Muncie IN Public
Safety Five
police
cars,
two
inves3ga3ve
cars
and
three
evidence
vans 












265,000

Muncie IN Public
Safety NEC
latent
fingerprint
sta3on
(AFIS) 














53,000

Muncie IN Public
Safety Ocean
Sytem
video
Processing
Sta3on 














14,000

Muncie IN Public
Safety Remodeling
of
Fire
Sta3on
#4 












100,000

Muncie IN Public
Safety Repair
of
Fire
Sta3on
#1 












260,000

Muncie IN Public
Safety Repair
of
Fire
Sta3on
#3 















2,000

Muncie IN Public
Safety Repair
of
Fire
Sta3on
#5 














22,000

Muncie IN Public
Safety Repair
of
Fire
Sta3on
#7 














20,000

Muncie IN Public
Safety Replacement
of
Fire
Sta3on
#3 












600,000

Muncie IN Public
Safety Replacement
of
Fire
Sta3on
1 










1,500,000

Muncie IN Public
Safety Underground
parking
garage
for
City
Hall
$19,000
per
parking
spacing 










1,000,000

Muncie IN Public
Safety Video
camera
equipment,
printersand
imagers
for
cars 












115,000

Muncie IN Public
Safety WEB
page
development 















5,000

Muncie IN Public
Safety Ten
officers 












750,000
 10
Muncie IN Streets/Roads Alternate:

McGalliard
Road
from
Wheeling
to
Broadway
(1.6
miles)‐Mill/Replace
damaged
curbs
where
 












800,000

Muncie IN Streets/Roads Alternate:

Tillotson
Avenue
from
Riverside
to
McGalliard
(1.3)‐Mill
where
necessary/Raise
Structures/3
inch
 












600,000

Muncie IN Streets/Roads Bridge
No.
122
(550S
over
Bell
Creek) 












550,000

Muncie IN Streets/Roads Bridge
No.
205
(100W
over
No
Name
Creek) 














75,000

Muncie IN Streets/Roads Bridge
No.
59
(450W
over
Kilbuck
Creek) 














75,000

Muncie IN Streets/Roads Bridge
No.
69
(600W
over
Kilbuck
Creek) 












425,000

Muncie IN Streets/Roads Bridge
No.
701
(Water
Street
in
Albany
over
Halfway
Creek) 












325,000

Muncie IN Streets/Roads Fuson
Rd.
(Old
SR
67)
from
SR‐67
Interchange
to
Cowan
Road‐Mill
where
necessary/3
inch
resurface/shoulder

improvements 












600,000

Muncie IN Streets/Roads Reconstruc3on
of
5‐lane
McGalliard
Rd. 










8,000,000
 10
Muncie IN Streets/Roads Reconstruc3on
of
5‐lane
Tillotson
Ave. 










4,000,000
 10
Muncie IN Streets/Roads Repaving
and
sidewalk
repair
for
streets
and
sidewalks
not
in
low
to
moderate
income
neighborhoods
making

ADA
compliant 








25,000,000
 60
Muncie IN Transit Purchase
four
replacement
hybrid
electric
transit
buses 










2,100,000

Muncie IN Transit Purchase
four
replacement
paratransit
(MITSPlus)
vans 












315,000

Muncie IN Water 18th
and
Macedonia
storm
sewers
and
roads 










4,000,000

Muncie IN Water 8th
St.
and
Howell
St. 










1,000,000

Muncie IN Water Elgin
St..
and
McGalliard
Rd. 














75,000

Muncie IN Water Perdieu
and
Ewing
storm
sewer 










1,000,000

Muncie IN Water Purdue
and
Ewing 










1,000,000

Muncie IN Water Robinwood
Addi3on‐Peqgrew
Acres 














75,000

Muncie IN Water Upper
Luick
Ditch 










1,200,000

Plymouth IN CDBG Installa3on
of
fiber‐op3c
network
serving
the
Plymouth
and
Marshall
County
Indiana
area. 










3,500,000
 120
Richmond IN Airport Runway
Overlay,
fencing,
terminal
improvements,
new
hangars 










2,000,000
 20
Richmond IN CDBG Principal
Riverwalk 








18,000,000
 25
Richmond IN Energy Richmond
Municipal
Building
Energy
Efficiency
Project 










1,000,000
 7.5
Richmond IN Public
Safety Fiber
op3c
cable
installa3on 










1,000,000
 20
Richmond IN Streets/Roads Salisbury
Road
North 










1,000,000
 10
Richmond IN Streets/Roads South
E
Street
Project 










2,000,000
 20
Richmond IN Water CSO
projects
as
part
of
the
long
term
control
plan 










5,000,000
 20
St.
John IN CDBG Columbia
Avenue
storm
sewer
project:

Add
addi3onal
capacity 












275,000
 15
St.
John IN CDBG Town
wide
Road
resurfacing
with
drainage
improvements,
including
areas
recently
annexed
into
the
Town 










1,600,000
 55
St.
John IN Water Joliet
street
Storm
sewer
rehabilita3on
project
to
minimize
flooding
through
an
older
sec3on
of
town.
Work

includes
upgrading
exis3ng
8"
Water
main
to
12" 












800,000
 27
St.
John IN Water Town's
Main
Lib
Sta3on
is
being
upgraded
due
to
capacity
being
reached.

A
new
building
will
be
constructed

along
with
new
pumps
and
controls. 










1,300,000
 43
Terre
Haute IN Airport ARFF
Firefigh3ng
Equipment
‐
to
replace
incomplete
sets
that
are
ten
or
more
years
old.
This
would
be
five

complete
sets. 














20,000
 0
Terre
Haute IN Airport ARFF
Fire
Truck
‐
currently,
the
only
two
trucks
covering
this
Interna3onal
Airport
are
1975
and
1976
models.


Air
Na3onal
Guard
flying
mission
removed
due
to
BRAC.

ARFF
coverage
also
removed. 












600,000
 6
Terre
Haute IN Airport New
Warehouse
/
Sort
Facility
for
Increased
FTZ
Opera3ons
 










1,200,000
 30
Terre
Haute IN Airport Terminal
Expansion
‐
necessary
area
for
expanded
passenger
service
and
TSA
requirements. 










3,700,000
 35
Terre
Haute IN Public
Safety Radio
Equipment
‐
Fire
Department
‐
will
enable
THFD
to
communicate
with
all
other
agencies
as
THFD
is
NOT

on
the
State
system 










1,000,000

City State Program Project
Descrip3on Funding
Required Jobs
Terre
Haute IN Public
Safety Radio
Equipment
‐
Police
Department
‐
will
enable
THPD
to
communicate
with
all
other
agencies
as
THPD
is

NOT
on
the
State
system 










1,600,000

Terre
Haute IN Public
Safety Fire
Department
EMS
Rescue
Truck
‐
Shared
asset
for
DHS
response
with
Task
Force
7
and
Vigo
County
EMA 












300,000
 4
Terre
Haute IN Public
Safety Public
Safety
Center
‐
Police,
Fire
and
EMA.

New
building
that
also
serves
Indiana
DHS
and
Task
Force
7.


Currently,
all
three
facili3es
are
spread
out,
have
structural,
mold
and
u3lity
issues. 










3,200,000
 30
Terre
Haute IN Streets/Roads Single
axle
and
tandem
dump
trucks
for
maintaining
State
Road
63
that
was
recently
given
to
the
City. 












225,000
 3
Terre
Haute IN Streets/Roads Brown
Avenue
‐
Wabash
Ave.
to
Locust
St. 










1,500,000
 15
Terre
Haute IN Streets/Roads Hunt
Rd.
Phase
I
‐
technology
/
industrial
park
adjacent
to
Terre
Haute
Interna3onal
Airport.
Road

improvements,
fiber
op3cs
and
u3lity
upgrades
needed
for
logis3cs,
trucking
and
aerospace
use.

Possible

ISU/Rose
Hulman
incubator
area. 










2,000,000
 15
Terre
Haute IN Streets/Roads Hunt
Rd.
Phase
II
‐
technology
/
industrial
park
adjacent
to
Terre
Haute
Interna3onal
Airport.
Road

improvements,
fiber
op3cs
and
u3lity
upgrades
needed
for
logis3cs,
trucking
and
aerospace
use.

Possible

ISU/Rose
Hulman
incubator
area. 










3,500,000
 15
Terre
Haute IN Streets/Roads Brown
Avenue
‐
Locust
St.
to
Maple
Ave. 










4,000,000
 20
Terre
Haute IN Streets/Roads Lafayefe
Avenue
‐
4th
St.
to
Haythorne. 










5,500,000
 20
Terre
Haute IN Streets/Roads Margaret
Avenue
‐
From
SR46
to
East
of
Fruitridge
Ave.

Upgrades
to
traffic
flow
to/from
new
Eastside

commercial,
retail
and
airport
areas. 










6,000,000
 20
Terre
Haute IN Streets/Roads Removal/Reloca3on
of
Railroad
Line
‐
Graham
Grain
Line
‐
will
increase
flow
of
traffic
and
reduce
costs
of
new

street
construc3on
including
US‐41. 










5,500,000
 25
Terre
Haute IN Streets/Roads Reloca3on
of
Railroad
yard
‐
Margaret
Ave
Crossing
improvements
and
Baker
Yard
reloca3on
to
Ft.
Harrison

Yard.

Will
ELIMINATE
East‐West
traffic
conges3on
and
expand
yard
capacity.

Part
of
Terre
Haute
Joint
Rail
Plan

with
CSX
and
IN
Railroad. 








35,000,000
 50
Terre
Haute IN Transit ADA
Hydraulic
Libs
for
three
City
Buses
‐
Increases
route
service 














60,000
 0
Terre
Haute IN Transit Hybrid
Public
Bus 












180,000
 2
Terre
Haute IN Water Wastewater
Treatment
Plant
‐
Phase
II
Digester
Replacement 










1,100,000
 25
Terre
Haute IN Water Deerfield
Project
‐
Upon
comple3on
of
the
first
part
of
the
US‐641
bypass,
addi3onal
lib
sta3ons,
extensions

and
sewer
connectors
for
residen3al
and
commercial
development. 










1,200,000
 35
Whi3ng IN CDBG Public
Building
asbestos
abatement
project 












250,000
 8
Whi3ng IN CDBG Museum
and
Art
Center 










1,250,000
 19
Whi3ng IN CDBG Public
Works
Facility
reloca3on 










1,750,000
 22
Whi3ng IN Energy Indiana
Energy
Savings
Contract
project
to
retrofit
municipal
buildings
with
new
energy
technology.

Also

includes
LED
traffic
and
street
light
conversion. 










1,875,000
 18
Whi3ng IN Public
Safety Police
Department
PC
and
dispatch
technology
upgrade 














25,000
 0
Whi3ng IN Public
Safety EMA
unit
startup
costs 














75,000
 2
Whi3ng IN Streets/Roads Center
Street
access
reconstruc3on 












300,000
 10
Whi3ng IN Streets/Roads Sidewalk
installa3on
capital
plan 












525,000
 12
Whi3ng IN Streets/Roads Cleveland
Avenue
street
reconstruc3on
including
water
and
sewer
replacement 










2,600,000
 35
Whi3ng IN Water Standard
Diamonds
water
line
installa3on 












150,000
 6
Whi3ng IN Water Hammond
water
line
service
connec3on 












850,000
 15
Whi3ng IN Water Schrage
Avenue
16"
water
main
installa3on
and
road
reconstruc3on 












650,000
 15
Whi3ng IN Water 121st
Street
sewer
collapse
repair
and
road
reconstruc3on 












750,000
 18
Whi3ng IN Water White
Oak
Avenue
sewer
and
water
lines
improvements
and
road
reconstruc3on 










2,000,000
 24
Whi3ng IN Water Wastewater
Deten3on
Facility
efficiency
upgrades 










3,300,000
 35
Kansas
City KS CDBG 726
Minnesota
Ave

Roof
Replacment 












150,000
 2
Kansas
City KS CDBG 726
Minnesota
Ave
Building
Mold
Abatement 












100,000
 2
Kansas
City KS CDBG Court
Services
Emergency
Generator 












250,000
 2
Kansas
City KS CDBG Courthouse
South
stair
renova3ons 












250,000
 2
Kansas
City KS CDBG Elec3on
Office
(850
State)
Parking
Lot
Repair 












100,000
 2
Kansas
City KS CDBG Memorial
Hall

Exterior
Pain3ng 












100,000
 2
Kansas
City KS CDBG Health
Department
Exterior
Restora3on 












400,000
 3
Kansas
City KS CDBG Health
Department
Roof
Replacment 












300,000
 3
Kansas
City KS CDBG 14th
&
Washington
Storm
Drainage 












400,000
 5
Kansas
City KS CDBG Court
Services
Restroom
&
Entry
ADA
Renova3ons 












750,000
 6
Kansas
City KS CDBG Memorial
Hall
Elevator
installa3on
4
units 










1,000,000
 6
Kansas
City KS CDBG Courthouse

Fire
Alarm
System
Replacement 










2,500,000
 8
Kansas
City KS CDBG Parking
Lot
B

6th
&
State
Ave

Redesign
and
Renova3on
of
deteriora3ng
parking
structure 










2,000,000
 8
Kansas
City KS CDBG Wyandofe
County
Lake
waterline 












800,000
 9
Kansas
City KS CDBG Health
Department
First
Floor
Renova3ons 










1,500,000
 10
Kansas
City KS CDBG Parking
Facili3es

A,C,E 










3,000,000
 10
Kansas
City KS CDBG Memorial
Hall
Building
Renova3ons 










2,000,000
 15
Kansas
City KS CDBG Western
Fire
Sta3on

New
Fire
Sta3on
in
Western
area
of
city 










4,500,000
 18
Kansas
City KS CDBG Parking
Facili3es
$20M
Public
Parking
Facility 








20,000,000
 80
Kansas
City KS Energy Environmental
Advisor:

Fund
the
hiring
of
a
consultant
or
permanent
employee
to
assist
in
environmental
 














60,000
 1
Kansas
City KS Energy Annex
(8200
State
Ave)
New
Cooling
Tower 












200,000
 2
Kansas
City KS Energy City
Hall/MOB
Roof
Replacement 












250,000
 2
Kansas
City KS Energy Courthouse
Fan
Coil
Replacement
Final
Phase 












150,000
 2
Kansas
City KS Energy City
Hall/MOB

Electrical
Service
Distribu3on
Tower 












603,592
 5
Kansas
City KS Energy Jus3ce
Complex
Roof

Building
Repair 












900,000
 6
Kansas
City KS Energy Jus3ce
Complex
Roof
Replacment 












900,000
 6
Kansas
City KS Energy Courthouse

Annual
Elevator
Projects 










2,500,000
 8
Kansas
City KS Energy Memorial
Hall

HVAC
Building
Upgrade 










3,000,000
 8
Kansas
City KS Energy Court
Services

New
Exterior
Window
Wall
System 










2,000,000
 10
Kansas
City KS Energy Fire
Sta3on
Facili3es

Rehab
of
exis3ng
buildings
that
are
in
various
states
of
disrepair 










3,500,000
 12
Kansas
City KS Energy Memorial
Hall

HVAC
Building
Upgrade 










2,000,000
 12
Kansas
City KS Energy East
Building

Chiller
Repair/Cooling
Tower 










1,065,000
 14
Kansas
City KS Energy energy
efficient
window
replacement
in
5
major
goverment
owned
buildings 










2,000,000
 22
City State Program Project
Descrip3on Funding
Required Jobs
Kansas
City KS Energy City
Hall

Window
Replacement
with
energy
improvemnet
design 










5,000,000
 30
Kansas
City KS Energy Courthouse
Renovate
&
Redesign
4th
and
5th
floors
space
with
energy
improvemnets
and
green
design 








15,000,000
 55
Kansas
City KS Energy City
Hall

Plaza
energy
improvement,
addi3on
of
green
design
feature,
municipal
court
and
structure

rehabilita3on
 








22,000,000
 100
Kansas
City KS Public
Safety Elec3on
Office
(850
State
Ave)
Security
System 














50,000
 2
Kansas
City KS Public
Safety Indian
Springs
Building
Demoli3on
Outbuildings/3
structures 












150,000
 2
Kansas
City KS Public
Safety Public
Levee

Barge
Dock
Stabiliza3on 












300,000
 2
Kansas
City KS Public
Safety Public
Levee

Decommission
Cold
Storage
Building 












500,000
 4
Kansas
City KS Public
Safety Court
Services
HVAC
Upgrade 










1,000,000
 5
Kansas
City KS Public
Safety New
Emergency
Management
Facility

Building 










3,000,000
 12
Kansas
City KS Public
Safety New
Jail
Deten3on
facility

Currently
the
jail
popula3on
exceeds
capac3y
of
the
jail
facility.

This
results
in

extensive
$
on
farm
outs.
(Office
Space
for
Juvenile
Courts,
D.A.,
&
staff) 










6,000,000
 20
Kansas
City KS Public
Safety City
Hall/MOB

Ground
Floor
Renova3on 










5,000,000
 40
Kansas
City KS Public
Safety New
Jail
Deten3on
facility

Currently
the
jail
popula3on
exceeds
capacity
of
the
jail
facility.

This
results
in

extensive
$
on
farm
outs. 








18,000,000
 60
Kansas
City KS Public
Safety Abandoned
property
&
blighted
property
demoli3on

Currently
the
abandoned
property
demands
exceed
the

financial
resources.

Current
needs
are
about
$2.5
M.

Funding
is
over
a
1
or
2
year
period. 








10,000,000
 70
Kansas
City KS Public
Safety Levee

7
Levee
Support
$5M
Fairfax
$20M
Kaw
Valley 








25,000,000
 200
Kansas
City KS Streets/Roads Pierson
Park
Resurfacing

Roadway
Repair 












200,000
 3
Kansas
City KS Streets/Roads 142nd
St
Bridge

Bridge
Replacement 












200,000
 4
Kansas
City KS Streets/Roads East
Kansas
Ave
Bridges

Structural
Repairs 












250,000
 4
Kansas
City KS Streets/Roads Shawnee
Ave
Bridge

Bridge
Re‐deck 












350,000
 4
Kansas
City KS Streets/Roads Bridge
No.
85

Box
Culvert
Replacement 












350,000
 5
Kansas
City KS Streets/Roads 7th
Street
‐
Washington
Ave
to
Quindaro
Blvd

Curbs,
Sidewalk
Street
Rehab,
Lights 










1,200,000
 10
Kansas
City KS Streets/Roads 38th
St/Park
Dr
Pavement
Replacement 












900,000
 12
Kansas
City KS Streets/Roads Minnesota
Ave

Reconstruc3on
and
redesign
of
6th
St
to
8th
St 










2,000,000
 16
Kansas
City KS Streets/Roads County
Line
Rd

47th
St
to
55th
St 










1,600,000
 20
Kansas
City KS Streets/Roads State
Ave
‐
48th
to
69th
Curbs,
Sidewalk
Street
Rehab,
Lights 










3,500,000
 25
Kansas
City KS Streets/Roads Parallel
Avenue

5th
St
to
9th
St 










4,500,000
 30
Kansas
City KS Transit Bus
Rapid
Transit 










1,000,000
 6
Kansas
City KS Transit Bus
Replacement
ITS

Replace
buses
and
provide
I.T.
Technology 










2,000,000
 10
Kansas
City KS Water Jersey
Creek
Phases
4,5,6

Channel
Lining
Repair 












500,000
 4
Kansas
City KS Water Trechless
Sewer
Repair

Repair
of
exis3ng
infrastructure 












500,000
 4
Kansas
City KS Water Argen3n
Grit
Removal
Facility

System
to
protect
combined
sewer
siphon
under
the
Kaw
River 












800,000
 5
Kansas
City KS Water Pump
Sta3on
61
and
66

Pump
Sta3on
Rehab/Replace 












350,000
 5
Kansas
City KS Water River
Crossing
Gate
Repair 












500,000
 6
Kansas
City KS Water Middle
Jersey
Creek
CSO
Removal
I/I
Source
removal,
manhole
rehab,
pipeline
rehab 












800,000
 8
Kansas
City KS Water Pump
Sta3on
41
Force
Main

Force
Main
Replacement 










1,000,000
 8
Kansas
City KS Water Western
Jersey
CSO
Remocal
Program

Reapir
and
Separa3on
of
Sewer 










3,000,000
 12
Kansas
City KS Water AID
&
FID
Force
Main

Lining/Paralleling
Pipe 










3,000,000
 25
Kansas
City KS Water CID
Storm
Sewers


CSO
Elimina3on 










3,000,000
 25
Kansas
City KS Water Parallel
Avenue
Storm
Sewers

Extend
street
project
storm
sewers 










5,000,000
 33
Kansas
City KS Water Potable
drinking
water
replacement
Replacing
water
mains.

There
is
in
over
200
miles
to
be
replaced
with
a

replacement
cost
of
over
$80M.

Funding
required
and
Number
of
Jobs
created
are
yearly. 










5,000,000
 33
Kansas
City KS Water 18th
St.
Storm
Sewer

CSO
Elimina3on 










6,000,000
 35
Kansas
City KS Water Green
Job
Sewer
System
expansion

Extend
sewer
systems
to
areas
currently
using
sep3c
systems 








15,000,000
 58
Kansas
City KS Water 18th
St
Pump
sta3on

Stormwater
Pump
Sta3on 








10,000,000
 60
Lenexa KS Streets/Roads PRAIRIE
STAR
PARKWAY
AND
PRAIRIE
CREEK
ROAD.

Traffic
Signal.













325,000
 18
Lenexa KS Streets/Roads K‐10
TRAIL.

10
foot
wide,
mul3‐use
trail
along
K‐10. 












415,000
 20
Lenexa KS Streets/Roads 95th
AND
RIDGE.

Traffic
signal
and
mul3‐use
path. 












700,000
 30
Lenexa KS Streets/Roads K‐10
AND
WOODLAND.

Streetligh3ng,
Traffic
signal
and
ramp
widening. 












700,000
 30
Lenexa KS Streets/Roads SLURRY
SEAL.

 












750,000
 30
Lenexa KS Streets/Roads MILL
OVERLAY. 










2,300,000
 80
Lenexa KS Streets/Roads ROAD
RECONSTRUCTION
‐
COLLEGE
BLVD
‐
RENNER
TO
RIDGEVIEW. 










9,085,000
 360
Lenexa KS Streets/Roads 87th
STREET
‐
RENNER
TO
LENNOX.

Street
reconstruc3on. 








17,000,000
 680
Lenexa KS Streets/Roads LONE
ELM
INTERCHANGE.

Construc3on
of
a
standard
diamond
interchange
with
roundabouts.

Widening
of

approximately
4,600
feet
of
Lone
Elm
Road
to
a
four‐lane
arterial
street.

Realighnment
of
the
frontage
road.


Con3nuous
auxilary
lanes
between
the
new
K 








47,500,000
 1880
Lenexa KS Water PRAIRIE
STAR
WETLAND
EXPANSION.
Expansion
of
an
exis3ng
constructed
wetland
facility.

The
wetlands
will
be
designed
to
mi3gate
the

stormwater
generated
froma
proposed
commmercial
site
on
the
adjacent
property. 










1,200,000
 40
Lenexa KS Water CITY
CENTER
CENTRAL
GREEN.

Construc3on
of
a
restored
streamway
and
wetland
complex
through
a

proposed
mixed
use
development.
Stormwater
quality
and
quan3ty
mi3ga3on
will
be
accomplished
in
an

exis3ng
impacted
stream
corridor
that
exist
on
the
proper 










4,500,000
 160
Lenexa KS Water LITTLE
MILL
CREEK
STREAMS/LACKMAN
TRIBUTARY.

This
tributary
has
been
highly
impacted
due
to
suburban

development.
Construc3on
will
include
a
variety
of
natural
stabiliza3on
techniques. 










5,000,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Lenexa KS Water LAKE
OF
THE
PRAIRIE.

Construc3on
of
a
reservoir
and
Park
facility
to
prevent
flooding
of
12
homes
in
an

established
neighborhood
of
western
Lenexa.

Will
include
wetland
plan3ngs
for
water
quality.

Park
facili3es

will
incorporate
green
infrastructure 








14,000,000
 560
Lenexa KS Water CORRUGATED
METAL
PIPE
REPLACEMENT.
Over
80
miles
of
pipe
that
needs
to
be
replaced.
The
total
cost
of

replacement
is
es3mated
to
be
about
$87
Million.
Of
this
amount
approximately
half
is
determined
to
be
in

need
of
immediate
replacement. 








30,000,000
 1200
Manhafan KS Airport Perimeter
Security
Fence
at
Manhafan
Regional
Airport
(MHK)












1,001,500
 8
Manhafan KS Airport Commercial
Aircrab
Hanger
and
Parking
Apron
at
Manhafan
Regional
Airport
(MHK) 










3,250,000
 62
Manhafan KS CDBG Kansas
State
University
Child
Development
Center 










1,000,000
 0
Manhafan KS CDBG Expansion
Facility
for
Manhafan
Day
Care
and
Learning
Centers,
Inc. 










3,200,000
 26
Manhafan KS CDBG Construct
Two
New
Fire
Sta3ons 










4,000,000
 136
Manhafan KS Public
Safety Implement
Regional
GIS 












450,000
 5
Manhafan KS Streets/Roads Traffic
Signal
Coordina3on
‐
Fort
Riley
Boulevard 














71,250
 1
Manhafan KS Streets/Roads Traffic
Signal
Coordina3on
‐
Kimball
Avenue 














93,750
 1
Manhafan KS Streets/Roads Traffic
Signal
Coordina3on
‐
Seth
Child
Road 














93,750
 1
Manhafan KS Streets/Roads Traffic
Signal
Coordina3on
‐
Tufle
Creek
Boulevard 














93,750
 1
Manhafan KS Streets/Roads Traffic
Signal
Coordina3on
‐
West
Anderson
Avenue 














93,750
 1
Manhafan KS Streets/Roads K‐18
and
Miller
Parkway/Davis
Drive
Signaliza3on
and
Installa3on
of
Turn
Lanes 












716,000
 8
Manhafan KS Streets/Roads East
Poyntz
Avenue
(US‐24)/Tufle
Creek
Boulevard/Fort
Riley
Boulevard 












144,500
 10
Manhafan KS Streets/Roads Tufle
Creek
Boulevard
(US‐24)
&
Walters
Drive/Tufle
Creek
Boulevard
&
Northfield
Road
Intersec3on

Improvements 












400,000
 11
Manhafan KS Streets/Roads Scenic
Drive
and
Miller
Parkway
Intersec3on 












967,000
 12
Manhafan KS Streets/Roads 4th
Street
‐
K‐18
to
Pierre
Street 










2,026,529
 19
Manhafan KS Streets/Roads 4th
Street
and
Bluemont
Avenue
Roundabout 










2,219,000
 19
Manhafan KS Streets/Roads McCall
Road
Improvements 










8,100,000
 19
Manhafan KS Streets/Roads Tufle
Creek
Boulevard
(US‐24)
and
Marlaf
Avenue 










1,536,000
 19
Manhafan KS Streets/Roads West
Anderson
Avenue/Kimball
Avenue
Road
and
Intersec3on
Improvements 












924,800
 20
Manhafan KS Water Konza
Sanitary
Sewer
Extension 










1,000,000
 8
Manhafan KS Water Konza
Waterline
Extension 










1,149,275
 8
Manhafan KS Water Downtown
Redevelopment
Sewer
Lines 












822,058
 10
Manhafan KS Water Downtown
Redevelopment
Water
Lines 












214,320
 10
Manhafan KS Water Downtown
Redevelopment
Storm
Sewers 










1,599,484
 12
Manhafan KS Water Tecumsah
and
Quivera
System 










6,250,000
 12
Manhafan KS Water Blue
Township
Sanitary
Sewer
Connec3on 










1,300,000
 39
Manhafan KS Water Water
Plant
Expansion/Upgrade
and
New
Raw
Waterline 








16,000,000
 90
Manhafan KS Water Wastewater
Plant
Expansion/Upgrade 








30,000,000
 106
Newton KS Airport Acquire
Land
For
Runway
17
Protec3on 












650,000
 3
Newton KS Airport Fuel
Storage
Security
Fence 












126,000
 5
Newton KS Airport Slurry
Seal
Runway
8‐26 












195,000
 10
Newton KS Airport Airfield
Guidance
Signage 












790,000
 15
Newton KS Airport Slurry
Seal
Runway
17‐35 












510,000
 15
Newton KS Airport Update
Runway
17
ILS
System 










1,000,000
 15
Newton KS Airport Add
Runway
35
ILS
System 










2,000,000
 20
Newton KS Airport Aircrab
Runup
Safety
Areas 










1,055,000
 20
Newton KS Airport Rehab/Widen
Taxiway 










3,000,000
 20
Newton KS Airport South
Development
Taxiway
and
Apron 










2,200,000
 20
Newton KS CDBG Reconstruct
SE
4th
St.:
Kansas
to
Walnut 












300,000
 15
Newton KS Streets/Roads SW
24th
Street
Bridge
Substructure
Pain3ng 












110,000
 5
Newton KS Streets/Roads W.
12th
Street:
Boyd
to
Meridian 












390,000
 10
Newton KS Streets/Roads Ash
Street
Bridge
over
Sand
Creek 










1,400,000
 15
Newton KS Streets/Roads Spencer:

Broadway
to
12th
St. 










1,260,000
 15
Newton KS Streets/Roads US‐50
Highway
and
Anderson
Road
Interchange 








32,500,000
 35
Newton KS Water Waterline
rehabilita3on
in
Athle3c
Park 












150,000
 7
Newton KS Water 8"
Pipe
Burs3ng
under
I‐135
to
Caperland 












350,000
 10
Newton KS Water Water
Tower
Pain3ng
&
Repair
Projects
Citywide 










1,400,000
 20
Newton KS Water 1st
Street
Water
Pump
Sta3on
Rehabilita3on 










2,000,000
 25
Newton KS Water Wastewater
Treatment
Plant
Improvements,
Ph.
2,
Nutrient
removal 








12,000,000
 30
Bowling
Green KY Airport Commercial
Air
Service
Revenue
Guarantee 












500,000
 15
Bowling
Green KY Airport Commercial/Industrial
Lover's
Lane
Development 










1,100,000
 30
Bowling
Green KY Airport New
Fixed
Based
Operator 












875,000
 31
Bowling
Green KY Airport Overlay
and
Strengthen
Runway
3‐21 










2,000,000
 40
Bowling
Green KY CDBG Double
Springs
East
Sidewalk
and
Drainage 












210,000
 1
Bowling
Green KY CDBG Park
Improvements 












282,000
 2
Bowling
Green KY CDBG Greenway
Path
construc3on
at
Kereiakes
Park;
Old
Louisville
Rd.,
West
Campus,
South
Campus
and
Lovers
Lane











1,045,000
 5
Bowling
Green KY CDBG N.
Limestone
Sidewalks/Bikelanes 












500,000
 20
Bowling
Green KY Energy City
Buillding
Energy
Retrofit 












500,000
 2
Bowling
Green KY Energy Install
Substa3on
security
cameras 












100,000
 2
Bowling
Green KY Energy Upgrade
street
ligh3ng
along
Kentucky
St.
from
31W
Bypass
to
8th
St 












211,000
 3
Bowling
Green KY Energy Upgrade
Street
Ligh3ng
along
Veterans
Memorial
Blvd.
Phases
3&4 












200,000
 3
City State Program Project
Descrip3on Funding
Required Jobs
Bowling
Green KY Energy Install
animal
preven3on
measures
at
Bowling
Green
Primary
substa3on 














90,000
 4
Bowling
Green KY Energy Bowling
Green
Primary
Substa3on
Relay
Upgrade 












500,000
 5
Bowling
Green KY Energy Fence
&
gravel
South
Industrial
poleyard 














80,000
 5
Bowling
Green KY Energy Re‐conductor
Circuit
CM
224
&
Circuit
5HI
214 










1,200,000
 10
Bowling
Green KY Energy Bowling
Green,
KY
to
Franklin,
KY
Fiber
connec3on 












384,000
 14
Bowling
Green KY Energy Bowling
Green,
KY
to
Morgantown,
KY
Fiber
connec3on 












600,000
 14
Bowling
Green KY Energy Energy
S3mulus
Efficiency
Grants 










3,000,000
 18
Bowling
Green KY Energy Data
center/Network
opera3ons
center
at
WKU
Center
for
Research
&
Development
(WKU
center
for
R&D) 










5,130,311
 50
Bowling
Green KY Housing Capitol
Improvements
and
Deferred
Maintenance
for
598
Public
Housing
Units 










5,000,000
 5
Bowling
Green KY Housing Fort
Webb
Subdivision
Infrastructure 










4,000,000
 5
Bowling
Green KY Housing Purchase
and
Renovate
Mul3‐family
Apartment
Complex 










5,000,000
 6
Bowling
Green KY Housing Lee
Square
Subdivision 










1,100,000
 10
Bowling
Green KY Housing Renova3ng
Distressed
Residen3al
Proper3es 












600,000
 200
Bowling
Green KY Public
Safety New
detec3ve
vehicles
and
undercover
vehicles 












200,000
 1
Bowling
Green KY Public
Safety Dedicated
Federal
Prosecutor
and
Support 












250,000
 2
Bowling
Green KY Public
Safety New/replacement
Surveillance
Equipment 












300,000
 2
Bowling
Green KY Public
Safety Two
New
Canine
Units 












250,000
 2
Bowling
Green KY Public
Safety Police
Annex/Storage
Facility
construc3on 










3,400,000
 30
Bowling
Green KY Schools Monitoring
System
District
Wide 












100,000
 4
Bowling
Green KY Schools Asbestos
Abatement 












250,000
 24
Bowling
Green KY Schools Improving/enhancing
Safety 












200,000
 24
Bowling
Green KY Schools HVAC
Work 










1,000,000
 36
Bowling
Green KY Streets/Roads Street
Resurfacing 












800,000
 4
Bowling
Green KY Streets/Roads Greenwood
Lane 










1,600,000
 10
Bowling
Green KY Streets/Roads Old
Morgantown
Rd.
reconstruc3on 










4,000,000
 29
Bowling
Green KY Streets/Roads Cave
Mill/Smallhouse
Road
Re‐alignment 










4,000,000
 30
Bowling
Green KY Streets/Roads Shive
Lane
Extension 










5,000,000
 36
Bowling
Green KY Streets/Roads Southwest
Parkway
construc3on
from
Nashville
Rd.
to
Russellville
Rd. 








20,000,000
 144
Bowling
Green KY Transit Bus
Transfer
Sta3on 










1,000,000
 13
Bowling
Green KY Water Security
System
Upgrade 












500,000
 6
Bowling
Green KY Water Install
check
valves
to
tank 












225,000
 7
Bowling
Green KY Water Filter
Backwash
replacement 












650,000
 8
Bowling
Green KY Water Jennings
Creek
Interceptor
Rehabilita3on 












300,000
 9
Bowling
Green KY Water CCTV
Assessment,
Sewer
Basins 












500,000
 10
Bowling
Green KY Water Telemetry
to
Sewer
Sta3ons 












500,000
 11
Bowling
Green KY Water Eliminate
Dead
End
Mains 










1,000,000
 12
Bowling
Green KY Water Interceptor
Cleaning
and
Video 












500,000
 13
Bowling
Green KY Water Replace
Cast
Iron
Mains 










1,000,000
 15
Bowling
Green KY Water Briarwood
Sewer
Rehabilita3on 










1,000,000
 26
Bowling
Green KY Water Relief
Sewer
to
Pioneer
Drive 










3,200,000
 32
Bowling
Green KY Water 2
MG
South
Central
Tank 










2,200,000
 38
Frankfort KY Water Franklin
County
Interstate
64
Regional
Water
Supply:
Construct
9
miles
of
24
inch
transmission
main
to
provide

regional
water
supplies
to
Frankfort,
Franklin
County,
Shelby
County
and
Scof
County
in
Kentucky. 








19,600,000
 157
Frankfort KY Water The
City
of
Frankfort
Holmes
Street
Sanitary
Sewer
Separa3on
Project:

Rehabilita3on
and
Separa3on
of

combined
sanitary
and
storm
water
in
a
low
income
area
of
the
city.

The
Project
includes
the
installa3on
of

3995
LF
of
Storm
Sewer
(210’
or
36”,
460 








10,000,000
 250
Hopkinsville KY CDBG The
proposed
project
is
to
construct
a
restroom
facility
in
the
Heart
of
Downtown
Hopkinsville
that
will
service

the
many
ameni3es
that
are
currently
available.

The
proposed
facility
would
be
erected
in
close
proximity
to

outdoor
facili3es
 












200,000
 0
Hopkinsville KY CDBG Riverwalk
Connector
Walking
Bridge:

The
City
of
Hopkinsville
is
proposing
that
a
walking
bridge
be
built

between
the
exis3ng
West
Side
Park
and
walking
trails
located
on
the
northern
bank
of
the
Lifle
River
and

walking
trails
 












150,000
 15
Hopkinsville KY CDBG The
proposed
project
includes
the
establishment
of
the
Campbell
Street
corridor
to
provide
a
more
efficient

entrance
into
downtown
Hopkinsville.

The
proposal
is
seeking
funding
for
the
renova3on
of
Campbell
Street.
 








15,000,000
 20
Hopkinsville KY CDBG The
City
of
Hopkinsville
is
reques3ng
a
$1,000,000
grant
over
the
period
of
two
(2)
years
to
be
u3lized
in
the

Inner
City
Residen3al
Enterprise
Zone
(ICREZ)
neighborhoods.

The
City
will
be
partnering
with
the
Chris3an

County‐Hopkinsville
Development
 










1,000,000
 200
Hopkinsville KY Energy Automated
Electric
Informa3on
System:

The
City
of
Hopkinsville
is
proposing
an
automated
electric

informa3on
system.

Currently,
electric
customers
use
more
electricity
than
necessary
due
to
lack
of

informa3on
about
the
amount
of
electricity
being
used 










3,900,000
 4
Hopkinsville KY Energy Hopkinsville,
KY
Green
Power
Project:

Hopkinsville
Electric
System
will
install
a
1
megawaf
genera3on
sta3on

on
Peartree
Lane
in
Hopkinsville.
This
sta3on
will
help
serve
the
electrical
needs
of
Chris3an
County
including

the
Fort
Campbell
Post. 










7,800,000
 6
Hopkinsville KY Housing Clark
Gardens
(Hopkinsville
Affordable
Homeownership
Program):
The
City
is
proposing
the
comple3on
of

infrastructure
for
the
Clark
Gardens
Subdivision.

The
Clark
Gardens
Subdivision
was
created
on
City
owned

property
in
2001
as
a
subdivision
 












550,000
 30
Hopkinsville KY Public
Safety Chris3an
County,
KY
High‐speed
Infrastructure:

Hopkinsville
Electric
System
(HES)
is
prepared
to
build
a
high‐
speed
communica3ons
network
throughout
Chris3an
County.
The
proposed
network
will
use
a
combina3on
of

fiber
op3c
transmission
lines
and
wir 










8,260,075
 11
Hopkinsville KY Public
Safety Communica3ons
Center
Renova3ons/EOC
backup:
The
Communica3ons
Center
Renova3ons
por3on
of
the

proposed
project
includes
improved
communica3ons
systems,
expanded
office
space
to
accommodate

dispatch
personnel,
increased
security
measures,
and
updates 












500,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Hopkinsville KY Public
Safety Eagle
Cove
Leb‐Hand
Turning
Lanes:
The
City
of
Hopkinsville
is
proposing
the
construc3on
of
a
leb‐hand

turning
lane
on
US68/80B
Eagle
Way
to
accommodate
and
provide
stacking
for
vehicular
traffic
afemp3ng
to

access
the
Eagle
Cove
Subdivision 












250,000
 15
Hopkinsville KY Public
Safety Riverbank
Stabiliza3on:
The
Lifle
River
Stabiliza3on
Project
will
include
the
design,
construc3on
management,

and
construc3on
of
the
necessary
walls
and
other
structures
required
to
stabilize
the
east
bank
of
the
Lifle

River
 












350,000
 15
Hopkinsville KY Public
Safety Pardue
Lane
Drainage
and
Passive
Park:
The
RC
Owen
property
is
located
on
the
south
side
of
Pardue
Lane.

A

por3on
of
the
property
is
slated
to
be
u3lized
to
provide
storm
water
facili3es
to
serve
the
immediate
area.
 












750,000
 30
Hopkinsville KY Schools Lacy
Elementary
Re‐roofing:
The
City
of
Hopkinsville
is
proposing
to
replace
last
phase
of
deteriorated
roof
of

Lacy
Elementary
School
which
is
an
exis3ng
K‐5th
grade
elementary
school. 












192,000
 5
Hopkinsville KY Schools Hopkinsville
Middle
School
Re‐roofing:
The
City
of
Hopkinsville
is
proposing
to
replace
sec3on
of
roof
over

classrooms
in
an
exis3ng
grade
6‐8
middle
school.

 












520,000
 7
Hopkinsville KY Schools Hopkinsville
High
School
Re‐roofing:
The
City
of
Hopkinsville
is
proposing
to
replace
the
deteriorated
roof
over

gymnasium
of
an
exis3ng
grade
9‐12
high
school.

 












603,000
 9
Hopkinsville KY Schools Chris3an
County
Middle
School:
The
City
of
Hopkinsville
is
proposing
the
construc3on
of
middle
school
to

include
grade
6
thru
8
for
800
students
to
replace
the
exis3ng
school
built
in
1959.

 








22,600,000
 90
Hopkinsville KY Transit Lovers
Lane
Expansion:
The
City
of
Hopkinsville
is
proposing
a
major
widening
of
the
exis3ng
Lovers
Lane
from

2
lanes
to
3
lanes
from
US
HWY
41A
(Ft
Campbell
Blvd)
on
the
east
to
the
junc3on
of
Lovers
Lane
and
the

Pennyrile
Parkway
Extension
 










4,000,000
 30
Hopkinsville KY Transit Chris3an
County
Advanced
Road
Development
Program
2009:
The
proposal
is
to
pave
the
exis3ng
93
miles
of

gravel
roads
in
Chris3an
County.

Chris3an
County
Kentucky
is
geographically
the
second
largest
county
in
the

State
of
Kentucky.
Fort
Campbell,
KY, 








11,250,396
 100
Hopkinsville KY Water US
41A
Water
Main
Improvements:
The
proposal
is
to
replace
8‐inch
water
main
along
US41A
with
12‐inch

main,
construct
2
million
gallon
elevated
storage
tank
and
booster
sta3on,
and
construct
an
interconnect
with

Oak
Grove 










6,000,000
 25
Hopkinsville KY Water Hillaire/Skyline
Drive
Stormwater
Infrastructure
Improvements:

The
proposed
project
will
involve
storm
water

infrastructure
improvements
that
will
benefit
many
Givens
Addi3on
area
homes
that
currently
experience

flooding
of
crawl
spaces,
yards 












538,800
 30
Hopkinsville KY Water Westwood
Drive
Stormwater
Infrastructure
Improvements:

The
proposed
project
will
involve
storm
water

infrastructure
improvements
that
will
benefit
a
minimum
of
ten
(10)
structures
that
currently
experience

flooding
of
structures,
yards,
and
streets.

 










1,096,800
 30
Hopkinsville KY Water Hopkinsville
Water
Main
Extensions
–
US
68/80
Bypass:
The
proposal
is
to
install
water
main
along
US68/80B

which
will
provide
water
service
to
the
currently
unserved
area. 










8,000,000
 35
Hopkinsville KY Water Moss
Water
Treatment
Plant
Upgrade/Expansion:
The
proposal
is
to
upgrade
the
exis3ng
treatment
and

expand
the
capacity
from
10
to
15
million
gallons
per
day
which
will
provide
for
compliance
with
current
and

future
regula3ons
and
adequate
capacity
throu 








15,000,000
 50
Hopkinsville KY Water SRF
Phase
VI:

The
proposed
project
will
involve
various
gravity
sewer
rehab
and
replacement
projects,
three

sewer
extensions,
installa3on
of
chemical
feed
equipment
for
phosphorus
compliance
at
Northside
WWTP;
 










7,500,000
 50
Hopkinsville KY Water SRF
Phase
VII:

The
proposed
project
will
involve
five
sewer
extensions
along
US68/80B
and
US41A;
include
15

new
pump
sta3ons
and
upgrading
four
exis3ng
pump
sta3ons
which
will
provide
sewer
service
to
unserved

areas
allowing
residen3al
and
commercial 








21,500,000
 50
Hopkinsville KY Water Dry
Dam:
The
proposed
project
will
include
the
design
and
construc3on
of
a
regional
flood
control
facility

and/or
watershed
lakes
strategically
placed
to
provide
the
necessary
flood
control
for
the
South
Fork
of
Lifle

River.
Flooding
in
the
City
of
Hopk 








13,000,000
 75
Lexington KY Airport Air
Carrier
Ramp
Rehabilita3on 










2,618,000
 25
Lexington KY Airport Relocate
Terminal
Drive
and
Airfield
Ligh3ng
Electrical
Vault 










5,930,000
 60
Lexington KY Airport Construct
TW
D
Reloca3on
and
Corp.
Ramp
Addi3on
–
Phase
II 










7,033,000
 70
Lexington KY Airport Construct
RW
9‐27
Phases
II
and
III 








18,000,000
 150
Lexington KY CDBG Downtown
plaques
in
various
parks
and
spaces
need
to
be
cleaned
in
an3cipa3on
of
2010
World
Equestrian

Games 














75,000
 5
Lexington KY CDBG Mark
Ave
sidewalk
comple3on 














25,000
 5
Lexington KY CDBG Sidewalk
Ramps,
Garden
of
Hartlands
Subdivision 














10,000
 5
Lexington KY CDBG South
Broadway
sidewalk
enhancements 














50,000
 5
Lexington KY CDBG Family
Care
Home
Network
Building;
Flooring/Pain3ng
and
HVAC 














56,000
 6
Lexington KY CDBG Solar
Compactors
–
project
to
collect
recyclables
and
trash
in
centralized
downtown
areas
in
solar
compactors.

The
project
will
reduce
fuel
costs,
container
costs,
traffic
issues,
reduce
air
pollu3on,
and
improve
accessibility

on
sidewalks. 












780,000
 6
Lexington KY CDBG Streets
&
Roads
Forestry
Sweeper/Replace
Wall
Unit
and
Heater
and
Pain3ng 














22,000
 7
Lexington KY CDBG Streets
&
Roads
Forestry
Salt
Building;
Roofing 














50,000
 8
Lexington KY CDBG Black
and
Williams
Center
Gym;
Flooring
and
Windows 












250,000
 10
Lexington KY CDBG Charles
Young
Center
Repair/Renova3on 












250,000
 10
Lexington KY CDBG Day
Treatment;
Flooring
and
Water
Heat
Pumps 














74,000
 10
Lexington KY CDBG GTV3;
Upgrade/Renovate/HVAC
Improvements 














58,000
 10
Lexington KY CDBG Loudon/Bryan/Castlewood
Intersec3on
Improvements
and
Streetscape
Enhancements 












250,000
 10
Lexington KY CDBG Provide
water
service
to
dog
park
at
Wellington
Park 














70,000
 10
Lexington KY CDBG Replace
outdated
cinder
block
dugouts
on
18
city‐program
ball
fields
with
park‐standard
chain
link.

Current

structures
allow
illicit
and
dangerous
ac3vity
out
of
sight. 












162,000
 10
Lexington KY CDBG Versailles
Road
sidewalk
enhancements 












100,000
 10
Lexington KY CDBG Waste
Management;
Pain3ng/Flooring
and
HVAC
Improvements













150,000
 10
Lexington KY CDBG Waste
Management‐Vehicle
Wash;
Truck
Bay
Renova3ons/HVAC
Improvements 












135,000
 12
Lexington KY CDBG Furrow
Building‐1302
Versailles
Rd.;
Office
Renova3on 














30,000
 13
Lexington KY CDBG Community
Ac3on‐Opera3on
Family;
Replace
Flooring/Storm
Sewers/Paint 












600,000
 14
Lexington KY CDBG Explorium
of
Lexington;
Flooring
and
Pain3ng 












700,000
 14
Lexington KY CDBG Opera3onal
Adjustment
Center;
Flooring
and
HVAC 














90,000
 14
Lexington KY CDBG Safety
City;
Pain3ng/Flooring
and
HVAC
Improvements 














30,000
 14
City State Program Project
Descrip3on Funding
Required Jobs
Lexington KY CDBG Streets
&
Roads
Forestry
Building
#1;
Electrical
Upgrade/Pain3ng
and
HVAC
Improvements 












110,000
 14
Lexington KY CDBG Family
Care
Center;
Flooring
and
Pain3ng 












200,000
 15
Lexington KY CDBG Arts
Place;
Window/Floor
Upgrade,
HVAC
Upgrade 












340,000
 16
Lexington KY CDBG Furrow
Building‐1306
Versailles
Rd.;
Recycling
Center
Total
Renova3on 












500,000
 16
Lexington KY CDBG Coopera3ve
Extension
Service;
Kitchen
Renova3on/Flooring/Wall
Paper
and
HVAC 












447,000
 17
Lexington KY CDBG Coleman
House;
Renovate
Bathrooms/Electrical/flooring
and
HVAC 












150,000
 18
Lexington KY CDBG Streets
&
Roads
Forestry
Building
#2;
Renova3on
and
New
Roofing 












100,000
 18
Lexington KY CDBG Switow
Building;
Pain3ng/Flooring
and
HVAC
Improvements 












170,000
 18
Lexington KY CDBG Carnegie
Center;
Windows/Pain3ng/Flooring
and
HVAC 












910,000
 19
Lexington KY CDBG Morton
House;
Total
Building
Renova3on
including
HVAC
Improvements 












850,000
 19
Lexington KY CDBG Convert
unafrac3ve
conven3onal
playground
to
Splash
Park
at
Castlewood
Park 












150,000
 20
Lexington KY CDBG Courthouse
Parking
Garage
Restora3on.

Safety,
ADA,
and
structural
improvements
to
important
downtown

public
parking
garage. 












517,900
 20
Lexington KY CDBG General
Services
Building;
Renova3on/Roofing/HVAC 












385,000
 20
Lexington KY CDBG Old
Transfer
Sta3on;
Demoli3on 










1,000,000
 20
Lexington KY CDBG Recycling
Center;
Flooring/Pain3ng
and
HVAC
Improvements 












133,000
 20
Lexington KY CDBG Upgrade
of
Roofing
(insula3on)
and
HVAC
systems
of
Kenwick 












200,000
 20
Lexington KY CDBG Upgrade
of
Roofing
(insula3on)and
HVAC
systems
of
Bell
Place 












200,000
 20
Lexington KY CDBG Water
service
to
Coldstream
park 














50,000
 20
Lexington KY CDBG Fleet
Services;
Flooring/Pain3ng
and
HVAC 












200,000
 22
Lexington KY CDBG Revenue
Commission
Roof
Replacement
and
Skylight
Restora3on
Replace
exis3ng
built‐up
roof
w/
a
new
roof

and
restore
historic
skylight. 












250,000
 22
Lexington KY CDBG Central
Kentucky
Job
Center;
Flooring/Entrance/HVAC
Renova3ons 












170,000
 23
Lexington KY CDBG Large
capacity
picnic
shelter
with
restrooms
for
park
and
trail
associated
events
@
Coldstream 












500,000
 25
Lexington KY CDBG Lights
to
Shillito
Tennis
Complex,
to
replace
poor
ligh3ng
at
city's
premier
tennis
facility
where
safety
has

become
an
issue.

Economic
Development
Opportunity 












700,000
 25
Lexington KY CDBG McConnell
Springs
Interpre3ve
Overlook
at
Final
Sink
&
Small
Storage 














40,000
 25
Lexington KY CDBG Redevelopment
of
Northeastern
Park
in
conjunc3on
with
adjacent
Hope
Six
Housing
project 












125,000
 25
Lexington KY CDBG Redevelopment
of
Realtor's
Plaza 












130,000
 25
Lexington KY CDBG Renovate
historic
Carriage
House
Theater
at
Bell
House,
a
150
year
old
historic
landmark
in
Lexington 












250,000
 25
Lexington KY CDBG Renovate
outdated
shelter/restroom
building
that
houses
Therapeu3c
Recrea3on
and
swim
camp
programs

and
skateboard/concession
func3ons
with
energy
and
security
efficient
structure 












150,000
 25
Lexington KY CDBG Replace
Lakeside
Golf
Course
irriga3on
to
incorporate
adjacent
lake
to
reduce
expense
of
buying
treated
water

for
course 












500,000
 25
Lexington KY CDBG Replace
windows
at
Dunbar 












100,000
 25
Lexington KY CDBG Woodward
Heights
redevelopment
‐
Poten3al
Trail
System
Comfort
Sta3on
or
Bike
Hub 












250,000
 25
Lexington KY CDBG Bell
House
replacement
windows
on
signature
public
space
in
Lexington.

Project
will
reduce
fuel
costs,
water

incursion
and
deteriora3on
to
150
year
old
Na3onal
Historic
Register
property 












150,000
 30
Lexington KY CDBG Terminal
Curbside
Improvements
and
Terminal
Façade
Renova3on 










2,549,000
 30
Lexington KY CDBG Phoenix
Building;
Windows/Flooring/Pain3ng
and
HVAC
Improvements 










2,020,000
 35
Lexington KY CDBG Kentucky
Theater;
Improve
Sound
System/New
Sea3ng/New
Ligh3ng
and
HVAC 










1,660,000
 36
Lexington KY CDBG Government
Center;
Total
Building
Renova3ons 










8,000,000
 40
Lexington KY CDBG Senior
Ci3zens
Center;
Total
Building
Renova3ons‐Add
Courtyard
and
HVAC
Improvements 










1,210,000
 48
Lexington KY CDBG Race
Street
Shotgun
House
Redevelopment 










2,000,000
 50
Lexington KY CDBG Rosemont
Garden
Improvements
from
Railroad
to
Lafayefe
Parkway 










1,900,000
 50
Lexington KY CDBG Russell
School
Adap3ve
Reuse
for
affordable
housing
designed
to
increase
density
and
reduce
carbon
footprint

with
green
(LEED)
construc3on. 










4,388,500
 50
Lexington KY CDBG Small
restroom
facili3es
(2)
@
Coldstream
(Legacy
Trail) 












500,000
 50
Lexington KY CDBG Transit
Center
Parking
Garage
Restora3on.

Safety,
ADA,
and
structural
improvements
to
important
downtown

public
parking
garage. 










1,026,000
 50
Lexington KY CDBG Bluegrass
Community
&
Technical
College
Cer3fica3on
program
on
Green
Construc3on/Retrofiqng
&

Installa3on/Conversion
to
Energy
Efficient
HVAC
Systems
courses. 










1,271,000
 52
Lexington KY CDBG Downtown
Arts
Center;
Total
Renova3on
to
3rd
Floor
and
HVAC
to
Floors
3
&
4 










1,150,000
 58
Lexington KY CDBG Coroner's
Office;
Total
Building
Renova3ons
including
HVAC 










1,500,000
 60
Lexington KY CDBG Black
and
Williams
Center;
Total
BuildingRenova3on/HVAC/Plumbing
and
Windows 










2,000,000
 75
Lexington KY CDBG Government
Center
Parking
Garage
Restora3on.

Safety,
ADA,
and
structural
improvements
to
important

downtown
public
parking
garage. 










2,181,000
 75
Lexington KY CDBG Youth
Services;
Total
Building
Renova3on
including
HVAC
Improvements 










3,000,000
 85
Lexington KY CDBG Fayefe
County
Courthouse;
Major
Renova3on/HVAC 








23,000,000
 90
Lexington KY CDBG Rehab
the
former
Youth
Deten3on
Center
to
adequately
provide
for
programs
and
services
to
Lexington's

youth
and
their
families. 










1,800,000
 92
Lexington KY CDBG Build
4
mul3
use
fields
at
Shillito
with
lights
and
ar3ficial
turf
for
year‐round
play
of
expanding
youth

popula3on
and
non‐tradi3onal
sports
without
dedicated
space.

Economic
Development
Opportunity 










6,150,000
 100
Lexington KY CDBG Build
8
field
soccer
complex
at
Cardinal
Run
North
with
ar3ficial
turf
to
allow
for
3000
player
soccer
league
to

con3nue
aber
loss
of
field
space
elsewhere.

Economic
Development
Opportunity 










8,680,000
 100
Lexington KY CDBG develop
centralized
city‐wide
4
field
Football
Complex
with
ar3ficial
turf
to
avoid
'home‐away'
conflicts
and

provide
safer
surface 










3,000,000
 100
Lexington KY CDBG Isaac
Murphy
Memorial
Art
Garden
will
create
green
public
gathering
space
promo3ng
walkability,

sustainability,
and
neighborhood
revitaliza3on. 










2,500,000
 100
Lexington KY CDBG Lyric
Theatre
Renova3on
‐
renova3on
and
expansion
of
former
African‐American
theatre
for
performing
arts

use,
a
local
African
American
Heritage
Museum,
and
mul3‐purpose
community
flex
space.
Building
is
LEED

cer3fied. 










6,000,000
 100
Lexington KY CDBG Pyramid
Park
redevelopment
in
conjunc3on
with
Dis3llery
District
TIF
project 












150,000
 100
City State Program Project
Descrip3on Funding
Required Jobs
Lexington KY CDBG Renovate
tennis
building
at
Shillito
Park
to
allow
for
year
round
instruc3on
and
regional
tournaments
to
visit

the
area 












400,000
 100
Lexington KY CDBG Terminal
Interiors
Renova3on
–
Baggage
Claim
&
Public
Lobby
Areas 










6,814,000
 100
Lexington KY CDBG Build
a
Senior
Ci3zen
Center
to
provide
programs
and
services
to
meet
the
needs
of
Lexington's
growing
senior

ci3zen
popula3on. 








12,000,000
 132
Lexington KY CDBG Public
Safety‐
Construc3on
of
new
West
Sector
Roll
Call
Facility 










1,500,000
 150
Lexington KY CDBG Rehab
exis3ng
underu3lized
structures
in
low
income
areas
to
establish
Neighborhood
Places,
a
one‐stop

social
service
concept
which
brings
together
local,
state
and
community
agencies
to
provide
services
within

neighborhoods. 










4,330,000
 185
Lexington KY CDBG Castlewood
Community
Center
‐
replace
2
outdated
structures
with
30,000
b2
modern
fitness,
mee3ng,

educa3on
space
in
income
challenged
area
of
the
community 










8,000,000
 200
Lexington KY CDBG Construct
Community
Building
at
Coolavin
Park
in
the
center
of
an
economically
disadvantaged
neighborhood 












400,000
 200
Lexington KY CDBG Distrillery
District
public
improvements
to
include
new
sidewalks,
Town
Branch
Trail,
placement
of
u33lity
lines

underground,
storm
drainage
improvements,
and
new
sanitary
lines 








15,000,000
 250
Lexington KY CDBG Cost
increase
for
single
family
home
construc3on
to
be
built
to
Green
Build
Kentucky
Standards. 










4,000,000
 300
Lexington KY CDBG Funding
required
to
focus
on
remodeling
and
energy
efficiency
programs
to
Green
Build
Kentucky
Standard

(includes
training
&
educa3on
programs). 










5,500,000
 375
Lexington KY Energy LED
street
name
signage 












160,000
 5
Lexington KY Energy Rebuild
Signalized
Intersec3on,
Cooper
Drive
at
University
Drive 












200,000
 5
Lexington KY Energy Rebuild
Signalized
Intersec3on,
Rosemont
Garden
at
Southland
Dr 












200,000
 5
Lexington KY Energy Rebuild
Signalized
Intersec3on,
Third
Street
at
Race
Street 












200,000
 5
Lexington KY Energy Anaerobic
Composter
–
A
project
to
develop
an
anaerobic
compos3ng
system
for
food
waste
and
other

organics
in
our
waste
stream.

This
process
will
generate
usable
electricity
for
homes
and
businesses
lowering

our
carbon
footprint
by
virture
of
reducing
g 








15,000,000
 10
Lexington KY Energy Re‐build
Traffic
signals
in
downtown 










1,600,000
 15
Lexington KY Energy Construct
a
construc3on/demoli3on
materials
recovery
facility
adjacent
to
the
construc3on/demoli3on

landfill. 








12,500,000
 20
Lexington KY Energy Construct
regional
recycling
facility
HHW
facility
and
green
industrial
park 








12,000,000
 35
Lexington KY Housing Facade
Rehabilita3on
for
both
Commercial
and
Residen3al
Proper3es
in
Distressed
Condi3on 










1,000,000
 40
Lexington KY Housing Southend
Park
Mi3ga3on
Noise
Wall
Construc3on
(Newtown
Pike
Extension) 










5,000,000
 100
Lexington KY Housing Equestrian
View
‐
102
units
of
Home
Ownership
constructed
by
Housing
Authority
to
EnergyStar
Standards. 








10,200,000
 105
Lexington KY Housing Bluegrass
Aspendale
Phase
VI
‐
88
units
of
new
public
housing
constructed
by
Housing
Authority. 










9,925,000
 135
Lexington KY Housing Grand
Oaks
Phase
V
‐
88
units
of
new
public
housing. 










9,515,000
 135
Lexington KY Public
Safety 2010
World
Equestrian
Games
Na3onal
Criminal
History
Review 












480,000

Lexington KY Public
Safety 2010
World
Equestrian
Games
Public
Safety/Equipment 










1,750,000

Lexington KY Public
Safety School
Resource
Officers 












500,000
 5
Lexington KY Public
Safety Police
Central
Sector
Roll
Call;
Flooring
and
Pain3ng 












100,000
 8
Lexington KY Public
Safety Police
East
Roll
Call;
Flooring 












150,000
 8
Lexington KY Public
Safety Relocate
LFUCG
Communica3ons
Fiber
Op3c
for
South
Limestone
Streetscape
Project 














50,000
 10
Lexington KY Public
Safety Police
Gun
Range;
Flooring
and
Pain3ng/HVAC
Improvements 












100,000
 12
Lexington KY Public
Safety Police
Mounted
Patrol;
Flooring/Pain3ng
and
Upgrade
PTAC
System
and
Controls 














81,000
 12
Lexington KY Public
Safety Police
Training
Center;
Flooring/Pain3ng
and
Replacement
of
Ladders
and
Controls 












225,000
 14
Lexington KY Public
Safety Police
K‐9
Building;
Total
Building
Renova3ons
and
HVAC
Improvements 














95,000
 15
Lexington KY Public
Safety Police
West
Roll
Call
Center;
Renova3on
and
HVAC
Improvements 












500,000
 24
Lexington KY Public
Safety Police
Headquarters;
Bathroom
Upgrades
and
HVAC
Upgrade 










1,230,000
 25
Lexington KY Public
Safety Police
Technical
Services
Building;
Interior/Exterior
Pain3ng,
Loading
Dock
and
HVAC
Improvements 










1,018,000
 30
Lexington KY Public
Safety Public
Safety
Opera3ons
Center
(PSOC)
to
integrate
911/311/EOC
and
communica3on
services
into
one
system

and
facility. 








35,000,000
 312
Lexington KY Schools Major
Renova3on‐‐Arlington
Elementary
School 








13,206,275
 200
Lexington KY Schools Major
Renova3on‐‐Bryan
Sta3on
Middle
School 








16,983,245
 200
Lexington KY Schools Major
Renova3on‐‐Cassidy
Elementary
School 








13,827,791
 200
Lexington KY Schools Major
Renova3on‐‐Leestown
Middle
School 








18,227,636
 200
Lexington KY Schools Major
Renova3on‐‐Russell
Cave
Elementary
School 










6,905,067
 200
Lexington KY Schools New
Construc3on/Major
Renova3on‐‐Central
School
Bus
Garage 










5,676,676
 200
Lexington KY Schools New
Construc3on‐‐Equine
Agriscience
Educa3on
Center 










7,500,000
 200
Lexington KY Schools New
Construc3on‐‐Lafayefe
High
School
Football
Stadium 










6,500,000
 200
Lexington KY Streets/Roads Alumni
Drive,
Inbound,
Extend
Right
Through
Lane 












400,000
 10
Lexington KY Streets/Roads Conversion
of
Third
Street
and
Fourth
Street
to
Two‐way
Traffic 












100,000
 10
Lexington KY Streets/Roads Newtown
Pike
Extension
(Phase
4
Right‐of‐way
acquisi3on) 










6,200,000
 10
Lexington KY Streets/Roads North
Limestone
Streetscape
Enhancements
north
of
4th
Street 












250,000
 10
Lexington KY Streets/Roads Pine
Needles
Right
Turn
Lane
at
Man
O'
War 












275,000
 10
Lexington KY Streets/Roads Railroad
Crossing
Repairs
at
6
loca3ons 












100,000
 10
Lexington KY Streets/Roads Redding
Road
at
Lansdowne
Drive
Turn
Improvements 














95,000
 10
Lexington KY Streets/Roads Squires
Road
Sight
Distance
Improvements 












290,000
 10
Lexington KY Streets/Roads Ward
Drive
Extension 














60,000
 10
Lexington KY Streets/Roads Waveland
Museum
Lane
Reconstruc3on
at
Railroad
Intersec3on 












385,000
 10
Lexington KY Streets/Roads East
Third
Street
Streetscape
Enhancements 












250,000
 15
Lexington KY Streets/Roads Midland
Avenue
widening
for
the
Bluegrass
Aspendale
Redevelopment 












800,000
 20
Lexington KY Streets/Roads Newtown
Pike
Extension
(Mi3ga3on
Funding) 










3,000,000
 20
Lexington KY Streets/Roads Mt
Tabor
Road
Widening,
Patchen
Drive
to
Richmond
Road 










1,225,000
 30
Lexington KY Streets/Roads Construc3on
of
Salt
Barn
on
Athens‐Boonesboro 










2,500,000
 35
City State Program Project
Descrip3on Funding
Required Jobs
Lexington KY Streets/Roads Streetscape
Improvements
‐
Cheapeside
Park 










2,000,000
 35
Lexington KY Streets/Roads Newtown
Pike
Extension
(Phase
4
U3li3es) 










1,100,000
 50
Lexington KY Streets/Roads Polo
Club
Blvd
Comple3on 










3,400,000
 50
Lexington KY Streets/Roads Streetscape
Improvements
‐
Main
Street 










4,500,000
 75
Lexington KY Streets/Roads Streetscape
Improvements
‐
Vine
Street 










5,200,000
 75
Lexington KY Streets/Roads Streetscape
Improvements
Limestone
Ave 










8,500,000
 75
Lexington KY Streets/Roads Newtown
Pike
Extension
(Road
and
Bridge
Construc3on
‐
Phase
4) 










9,100,000
 150
Lexington KY Transit 2010
World
Equestrian
Games
Transporta3on
management,
planning
and
infrastructure. 










1,005,400

Lexington KY Transit Acquisi3on
of
automated
fare
boxes
and
GPS
system
for
each
exis3ng
and
proposed
bus 










1,600,000

Lexington KY Transit Construc3on
of
bus
shelters. 












150,000

Lexington KY Transit Construc3on
of
new
transit
center
in
downtown
Lexington. 








20,000,000

Lexington KY Transit Renova3on
of
maintenance
&
opera3ons
facility
at
Loudon
Dr. 










5,000,000

Lexington KY Transit Courthouse
Parking
Garage;
Upgrade
Revenue
Producing
Equipment 












100,000
 3
Lexington KY Transit Victorian
Square
Parking
Garage;
Upgrade
Revenue
Producing
Equipment 












100,000
 3
Lexington KY Transit Transit
Center
Parking
Garage;
Upgrade
Revenue
Producing
Equipment 












300,000
 4
Lexington KY Transit Addi3onal
cost
required
to
retrofit
4
trolley
buses
as
hybrid
technology. 












816,000
 5
Lexington KY Transit Annex
Parking
Garage;
Concrete
Repairs 












100,000
 5
Lexington KY Transit Graffi3
abatement
program 














75,000
 5
Lexington KY Transit Re‐pain3ng
traffic
signal
poles 














75,000
 5
Lexington KY Transit Courthouse
Complex
Parking
Garage
Repairs 












250,000
 8
Lexington KY Transit Courthouse
Parking
Garage;
Concrete
Repair 












250,000
 8
Lexington KY Transit Maxwell
Street
Bike/Pedestrian
Reconstruc3on,
North‐side 












150,000
 10
Lexington KY Transit Shilito
Park
Trail 












500,000
 10
Lexington KY Transit Southland
Bike
Lanes 












500,000
 10
Lexington KY Transit Wayfinding
Signage 












500,000
 10
Lexington KY Transit Acquisi3on
of
10
clean
diesel/bio
diesel
buses 










3,200,000
 15
Lexington KY Transit Addi3onal
cost
required
to
make
the
10
diesel/bio
diesel
buses
run
on
hybrid
technology. 










2,040,000
 15
Lexington KY Transit Transit
Center
Parking
Garage;
New
Ligh3ng/HVAC
Improvements 












136,000
 16
Lexington KY Transit Legacy
Trail
(Newtown
Pike
to
Loudon
Ave).

Project
con3nues
signature
bike/ped
trail
through
major

employment
areas. 












750,000
 20
Lexington KY Transit Improve
Pedestrian
Infrastructure
at
50
Intersec3ons 










1,000,000
 30
Lexington KY Transit Legacy
Trail
Bike/Pedestrian
Bridge
over
Newtown
Pike.

Bridge
would
connect
signature
bike/ped
trail

segments,
offering
important
alterna3ve
transporta3on
route. 










1,000,000
 30
Lexington KY Transit Brighton
East
Rail
Trail 










1,000,000
 35
Lexington KY Transit Legacy
Trail
(Loudon
Ave
to
Downtown).
Project
brings
signature
bike/ped
trail
from
heavy
employment
center

to
central
business
district. 










1,000,000
 50
Lexington KY Transit Construct
and
install
bike
corrals
throughout
the
city
with
focus
in
areas
with
high
bike
and
pedestrian
traffic. 












500,000
 75
Lexington KY Transit Healthway
Trail
System.
Complete
community‐wide
bike/ped
trail
system
connec3ng
residen3al,
employment

and
recrea3onal
resources
throughout
Lexington. 










9,000,000
 75
Lexington KY Transit Lexington‐to‐Versailles
Rail
with
Trail
Project.

Innova3ve
15
mile
bike/ped
trail
u3lizing
exis3ng
ac3ve
railroad

right‐of‐way
would
provide
alterna3ve
transporta3on
between
two
central
Kentucky
communi3es. 








19,000,000
 100
Lexington KY Water Variable
Frequency
Drive
Replacement
at
eight
Schedule
A
pumping
sta3ons 












120,000
 2
Lexington KY Water Design
and
Installa3on
of
two
Centrifuges
for
Solids
Processing
at
the
Town
Branch
Wastewater
Treatment

Plant 










3,500,000
 3
Lexington KY Water Old
Frankfort
Pike
(Town
Branch)
Pump
Sta3on
and
Force
Main
Rehabilita3on 










2,000,000
 4
Lexington KY Water Purchase/Demoli3on
of
Homes

Flood
Mi3ga3on
Phase
I 










1,000,000
 4
Lexington KY Water Installa3on/Upgrade
of
security
systems
including
upgraded
fencing,
gates
and
camera/computer
systems
at

both
the
Town
Branch
and
West
Hickman
Wastewater
Treatment
Plants 










4,500,000
 5
Lexington KY Water Phase
3
Screw
Pump
Replacement 










1,300,000
 5
Lexington KY Water Installa3on
of
Fiber
at
Town
Branch
and
at
West
Hickman
Wastewater
Treatment
Plants
for
Technology

Improvements 












300,000
 7
Lexington KY Water Installa3on
of
Various
Equipment
Replacement/Upgrades
at
West
Hickman
Wastewater
Treatment
Plant 










1,475,000
 7
Lexington KY Water Bowmans
Mill
Road
Culvert
Replacement 












253,000
 10
Lexington KY Water Delong
Road
Culvert
Repair 














60,500
 10
Lexington KY Water Delong
Road
Culvert
Replacement 












182,000
 10
Lexington KY Water Installa3on
of
Various
Equipment
Replacement/Upgrades
at
Town
Branch
Wastewater
Treatment
Plant 












900,000
 10
Lexington KY Water James
Lane
Culvert
Replacement 












182,000
 10
Lexington KY Water Venture
Court
Pump
Sta3on
conversion 












225,000
 10
Lexington KY Water West
Hickman
Creek
WWTP
Expansion
and
Solids
Process
Renova3on










18,000,000
 10
Lexington KY Water Paving
and
Repair
of
Roadways
on
the
campuses
of
the
Town
Branch
and
the
West
Hickman
Wastewater

Treatment
Plants 












500,000
 16
Lexington KY Water Sanitary
Sewer
System
Capacity
Improvements 










1,020,000
 20
Louisville KY Airport Airfield
Electrical
Ductbank
Reloca3on:
relocate
electrical
cables
and
a
ductbank
containing
a
number
of

circuits
for
the
airfield
ligh3ng
system
to
ensure
access
to
facili3es 












200,000
 10
Louisville KY Airport Midfield
Access
Road
Upgrade:
upgrade
the
midfield
access
road
by
installing
drainage
pipes,
curbs
and
gufer

sec3ons
to
secure
the
shoulder
and
adjacent
security
fence 












300,000
 16
Louisville KY Airport Aircrab
Apron
Reconstruc3on:
addresses
the
reconstruc3on
of
various
aircrab
aprons
at
Bowman
Field,
an

airport
that
reduces
the
air
traffic
of
smaller
propeller
aircrab
at
Louisville
Interna3onal
Airport 












600,000
 30
Louisville KY Airport T‐Hangar
Construc3on:
construc3on
of
T‐hangers
at
Bowman
Field
to
replace
exis3ng
units
with
updated
and

modern
facili3es
for
the
popula3on
base
at
this
facility 










2,500,000
 175
City State Program Project
Descrip3on Funding
Required Jobs
Louisville KY Airport Crifenden
Drive
Reloca3on:
The
reloca3on
of
Crifenden
Drive
from
just
south
of
I‐264
(Waferson

Expressway)
to
the
Chautauqua
Maintenance
hangar
is
necessary
to
facilitate
the
construc3on
of
a
taxiway

parallel
to
the
west
runway
at
Louisville
Interna3onal 








27,500,000
 500
Louisville KY CDBG Engine
2,
22,
6,
15
Apparatus 










2,000,000

Louisville KY CDBG Truck
1
Apparatus 












925,000

Louisville KY CDBG Preston
Corridor
Streetscape
–
Sidewalk,
landscape
and
other
streetscape
improvements
to
improve
the

availability
of
neighborhood
serving
retail.
Approximately
3,400
linear
feet 












350,000
 8
Louisville KY CDBG LMPD
Headquarters
Roof
Replacement
–
Replace
exis3ng
built‐up
roof
w/
a
new
roof 












500,000
 12
Louisville KY CDBG Metro
Correc3ons
Headquarters
Roof
Replacement
–
Replace
exis3ng
original
built‐up
roof
w/
a
new
built‐up

roof 












300,000
 12
Louisville KY CDBG Hall
of
Jus3ce
Escalator
Replacement
–
Replace
exis3ng
escalators
(2)
equipment
and
controls. 












500,000
 14
Louisville KY CDBG University
Corridor
Redevelopment
‐
Sidewalk,
landscape
and
other
streetscape
improvements;
land

acquisi3on;
street
lane
improvements
to
accommodate
cars,
trucks,
pedestrians
and
bikes;
all
work
is
meant
to

connect
University
to
surrounding
neighborhood. 












600,000
 14
Louisville KY CDBG West
Market
Street
Corridor
Improvements‐
Sidewalk,
landscape
and
other
streetscape
improvements;
land

acquisi3on;
to
improve
the
availability
of
neighborhood
serving
retail.
Approximately
7,000
linear
feet 












500,000
 14
Louisville KY CDBG City
Hall
Annex
Elevator
Replacement
–
Replace
exis3ng
elevator
equipment
and
controls. 












125,000
 15
Louisville KY CDBG Elevator
Installa3on
at
Fire
Headquarters:
Construc3on
of
an
elevator
shab,
elevator,
and
ves3bule
at
Louisville

Division
of
Fire
Headquarters
to
allow
ADA
access
to
second
floor
and
basement. 












350,000
 15
Louisville KY CDBG LMPD
Headquarters
Repair
and
Restora3on
‐
Granite
and
marble
exterior
restora3on
and
window

replacement. 












500,000
 15
Louisville KY CDBG Science
Center
Annex
Elevator
Replacement
–
Replace
exis3ng
elevator
equipment
and
controls. 












150,000
 15
Louisville KY CDBG Buechel
Area
Business
Improvement
District‐
Sidewalk,
landscape
and
other
streetscape
improvements;

drainage
improvements;
all
work
is
meant
to
improve
corridor
to
afract
more
business.
Approximately
4,900

linear
feet 












650,000
 16
Louisville KY CDBG Hampton
House
Exterior
Restora3on
‐

Tuckpoin3ng,
pain3ng,
cornice
&
porch
repair,
and
new
standing
seam

roof
on
a
Public
Health
Department
outreach
center. 












250,000
 17
Louisville KY CDBG City
Hall
Elevator
Replacement
–
Replace
exis3ng
elevators
(2)
equipment
and
controls. 












250,000
 20
Louisville KY CDBG Expansion
of
the
Automo3ve
Service
Facility
to
improve
service
to
the
EMS
Fleet 












410,000
 20
Louisville KY CDBG Lead
Abatement
Ac3vi3es:
reduce
lead
hazards
in
single‐unit
and
mul3‐unit
residences,
focusing
on
the
 










1,000,000
 20
Louisville KY CDBG Metro
Hall
Elevator
Replacement
–
Replace
exis3ng
elevators
(2)
equipment
and
controls. 












250,000
 20
Louisville KY CDBG Tree
plan3ng
1000
trees
in
CDBG
eligible
parks 












500,000
 20
Louisville KY CDBG Urban
Government
Center
–
850
Building
Roof
Replacement
–
Replace
exis3ng
built‐up
roof
w/
a
new
roof. 












200,000
 20
Louisville KY CDBG 617
West
Jefferson
Roof
Replacement
and
Skylight
Restora3on
Replace
exis3ng
built‐up
roof
w/
a
new
roof
and

restore
historic
skylight. 












250,000
 22
Louisville KY CDBG Memorial
Auditorium
Roof
Replacement
–
Replace
exis3ng
roof
w/
new
roof 












400,000
 24
Louisville KY CDBG Urban
Government
Center
–
810
Building
Elevator
Replacement
–
Replace
exis3ng
elevators
(3)
equipment
and

controls. 












625,000
 24
Louisville KY CDBG Fiscal
Court
Building
Lobby
Renova3on
–
Public
Lobby
renova3on
to
improve
ADA
access
to
elevators
and

restrooms. 












250,000
 26
Louisville KY CDBG Western
Branch
Library
Rehabilita3on:
Renovate
interior
of
historic
Carnegie
library
and
convert
mee3ng
room

into
African‐American
archive
space
and
study
center. 












800,000
 26
Louisville KY CDBG City
Hall
Annex
Roof
Replacement
–
Replace
mul3ple
exis3ng
built‐up
roofs
w/
new
built‐up
roofs. 












450,000
 28
Louisville KY CDBG City
Hall
Exterior
Restora3on
–
Limestone
cleaning
and
tuckpoin3ng
&
window
pain3ng 










1,400,000
 28
Louisville KY CDBG City
Hall
Roof
Replacement
–
Replace
numerous
roofs
on
historic
city
hall 












450,000
 28
Louisville KY CDBG Memorial
Auditorium
Exterior
Restora3on
–

Exterior
Restora3on
consis3ng
of
Limestone
cleaning
and
 










1,250,000
 28
Louisville KY CDBG Repair
and
refurbish
York
Street
Entrance
at
lobby
at
the
Main
Branch
Library:
repair
and
repaint
plaster
walls;

clean
historic
murals;
make
minimal
repairs
to
marble
floor
and
walls;
repair
electrical
system;
replace
ligh3ng

with
energy
efficient
fixtur 












350,000
 32
Louisville KY CDBG Construct
a
new
West
Entry
and
paths
along
the
Algonquin
Pavilion 










2,500,000
 35
Louisville KY CDBG Metro
Hall
Exterior
Restora3on
–
Exterior
Stone
Restora3on
,
Stucco
Repair
&
Masonry
Coa3ng. 










1,200,000
 36
Louisville KY CDBG Code
Allevia3on
Ac3vi3es:
assist
owner‐occupants
with
elimina3ng
exterior
code
viola3ons.
Target
areas
include
the
Smoketown,
Shelby
Park,
Phoenix
Hill,
Shawnee,
California,
Oakdale,
Portland,
&

Shagbark/Shanks
Lane
neighborhoods. 










7,000,000
 50
Louisville KY CDBG Riverside
Landing
Water
Supply,
Electric
Supply,
Sep3c
System,
and
Paving 










2,500,000
 50
Louisville KY CDBG Weatheriza3on
Ac3vi3es:
stabilize
exis3ng
housing
stock
by
replacing
energy
systems
including
but
not
limited

to,
furnaces,
water
heaters,
duct
work,
and
carbon
dioxide
and
smoke
detectors.
Target
areas
include
the

Smoketown,
Shelby
Park,
Phoenix
Hill 










2,000,000
 50
Louisville KY CDBG Portland
Branch
Library
Renova3on:
Repair
and
restore
exterior;
remodel
and
restore
interior
of
historic

Carnegie
library. 










1,400,000
 68
Louisville KY CDBG Installa3on
of
flat
floor
mul3‐purpose
auditorium
and
program
space
at
Main
Branch
Library:
replace
oversized

windows
with
energy
efficient,
historically
appropriate
windows;
remove
any
asbestos
adhesive
and
replace

ceiling
materials;
replace
ligh3ng 










1,050,000
 72
Louisville KY CDBG Main
Branch
Library
Rehabilita3on:
Convert
&
restore
east
wing
to
children’s
area;
rebuild
plaza
walkways;

repair
and
clean
exterior
of
buildings;
renovate
public
service
spaces;
replace
HVAC
systems
in
1908
building;

remodel
book
sor3ng
area
&
delivery 










2,700,000
 76
Louisville KY CDBG Belvedere
Restora3on
–
Reinforce
plaza
structure
to
accommodate
increased
loading
condi3ons,
waterproof

exis3ng
structural
slabs
and
remove
and
reinstall
concrete
pavers.











8,000,000
 92
Louisville KY CDBG Shawnee
Branch
Library
Rehabilita3on:
Rehab
and
restore
exis3ng
7,000
square
foot
historic
WPA‐era
library

and
add
3,000
square
feet
of
new
library
space.











2,100,000
 98
Louisville KY CDBG PW&A
Fleet
Services
Division
Design/Build
Renova3on
&
construc3on
project
to
consolidate
the
Fleet
services

division
into
a
new
facility
on
Millers
Lane 










8,000,000
 198
Louisville KY CDBG Sidewalks:
Proposed
funding
would
allow
for
replacement
of
approximately
50,000
linear
feet
of
sidewalk
in

CDBG
eligible
areas. 










2,000,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Louisville KY CDBG Emergency
Repair
Ac3vi3es:
rehabilitate
single
unit
residences
in
“emergency
situa3ons”
determined
by

Louisville
Metro
Housing
&
Community
Development.
Target
areas
include
the
Smoketown,
Shelby
Park,

Phoenix
Hill,
Shawnee,
California,
Oakdale,
Portlan 










3,500,000
 300
Louisville KY CDBG Retrofiqng
owner‐occupied
houses
of
low‐income
households:
repain3ng
interior
and
exterior
walls
with

ceramic
insula3ng
paint;
including
aqc
insula3on
to
R‐38;
addi3on
of
storm
windows
and
doors;

caulking/weatherstripping 










1,800,000
 300
Louisville KY CDBG Alley
Paving:
Proposed
funding
would
allow
for
62
miles
of
alleys
in
CDBG
eligible
areas
to
be
paved. 










4,000,000
 500
Louisville KY CDBG Home
repair
ac3vi3es
of
low‐income
households:
various
home
improvement
ac3vi3es
for
cri3cal
and
non‐
cri3cal
home
improvements
for
persons
from
low‐income
households. 










1,600,000
 800
Louisville KY CDBG Street
Resurfacing:
Proposed
funding
would
allow
for
143
miles
of
roads
to
be
resurfaced
in
CDBG
eligible

areas
within
one
season,
which
is
approximately
8
months
out
of
the
year. 








10,000,000
 1200
Louisville KY CDBG Park
Hill
Corridor
Improvement
Plan–
Plan
addresses
how
to
improve
the
corridor
to
make
it
more
func3onally

appealing
for
exis3ng
businesses
and
residents
with
the
intent
of
afrac3ng
more:
connect
and
widen
streets

when
appropriate;
improve
truck
and 








22,500,000
 2200
Louisville KY Energy Controllers
for
tennis
court
lights
at
15
loca3ons
totaling
77
courts
to
restrict
ligh3ng
to
periods
of
actual
use 












100,000
 2
Louisville KY Energy Convert
200
vehicles
(tractors
and
trucks)
to
use
alterna3ve
fuel
mix 












240,000
 5
Louisville KY Energy Energy
Efficient
Street
Lamps

•Replace
200
low
func3oning
VISCO
streetlights
with
HADCO
poles
with
energy
efficient
LED
lamps
and
long

las3ng
glass
or
acrylic
globes
– 












500,000
 10
Louisville KY Energy LMHW
Lab
Building
AHU
&
Boiler
Replacement
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC

system
with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,

enhanced
comfort
and
reduced
first
cost
and
opera3n 












400,000
 15
Louisville KY Energy LMPD
Headquarters
Air
Handling
Unit
&
Chiller
replacement
‐
Replace
the
exis3ng
energy
inefficient
and

unreliable
HVAC
system
with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon

emissions,
enhanced
comfort
and
reduced
first 












500,000
 15
Louisville KY Energy Metro
Development
Center
Cooling
Tower
and
Unit
Replacement
‐
Replace
the
exis3ng
energy
inefficient
and

unreliable
HVAC
system
with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon

emissions,
enhanced
comfort
and
reduced
firs 












450,000
 15
Louisville KY Energy Metro
Hall
Annex
Boiler
Replacement
‐
Replace
exis3ng
inefficient
5
boilers
&
misc
HVAC
with
a
new
HVAC

system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
comfort
and
reduced

first
cost
and
opera3ng
expenses. 












500,000
 15
Louisville KY Energy Newburg
Branch
Library:

Add
photovoltaic
solar
panels
as
electric
power
source. 












200,000
 18
Louisville KY Energy Old
Jail
Boiler
&
Unit
Replacement
–
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
with
a

new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
comfort

and
reduced
first
cost
and
opera3ng
expe 












500,000
 18
Louisville KY Energy City
Hall
Annex
HVAC
Replacement
–
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
with
a

new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
comfort

and
reduced
first
cost
and
opera3ng
expens 












400,000
 20
Louisville KY Energy Newburg
Community
Center
Geothermal
HVAC‐Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC

system
with
a
new
geothermal
heat
pump
system;
thus
lowering
the
hea3ng
bills
for
the
building
up
to
50

percent
and
lowering
cooling
bill 












550,000
 20
Louisville KY Energy Youth
Deten3on
Services
Chiller
Replacement
–
Replace
the
exis3ng
energy
inefficient
and
unreliable

equipment
with
a
new
equipment
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced

comfort
and
reduced
first
cost
and
opera3ng
expens 












800,000
 20
Louisville KY Energy 617
West
Jefferson
Green
Plumbing
Project
‐
replace
domes3c
water
heater
with
solar
water,
replace
plumbing

fixtures
w/low
water
capacity
fixtures
and
install
grey
water
cistern
to
collect
roof
storm
water
for
grey
water

toilet
flushing. 












150,000
 22
Louisville KY Energy 617
West
Jefferson
HVAC
Replacement
‐
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system

with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced

comfort
and
reduced
first
cost
and
opera3ng
exp 












750,000
 22
Louisville KY Energy Science
Center
Annex
Green
Roof

‐
replace
the
exis3ng
built‐up
roof
w/
a
new
Green
Roof;
promo3ng

environmental
sustainability
and
environmentally
beneficial
ini3a3ves.
Green
roofs
help
capture
storm
water

run‐off
that
otherwise
would
enter
the
sewer 












300,000
 22
Louisville KY Energy Science
Center
Green
Roof
‐
Replace
the
exis3ng
built‐up
roof
w/
a
new
Green
Roof;
promo3ng
environmental

sustainability
and
environmentally
beneficial
ini3a3ves.
Green
roofs
help
capture
storm
water
run‐off
that

otherwise
would
enter
the
sewer
system 












280,000
 22
Louisville KY Energy Central
Government
Building
Geothermal
HVAC
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC

system
with
a
new
geothermal
heat
pump
system;
thus
lowering
the
hea3ng
bills
for
the
building
up
to
50

percent
and
lowering
cooling
bills
up
to
30
pe 












750,000
 24
Louisville KY Energy SW
Government
Center
Geothermal
HVAC
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
with
a
new
geothermal
heat
pump
system;

thus
lowering
the
hea3ng
bills
for
the
building
up
to
50
percent
and
lowering
cooling
bills
up
to
30
percent 












900,000
 24
Louisville KY Energy Urban
Government
Center
850
Geothermal
HVAC
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC

system
with
a
new
geothermal
heat
pump
system.
thus
lowering
the
hea3ng
bills
for
the
building
up
to
50

percent
and
lowering
cooling
bills
up
to
30
pe 












800,000
 24
Louisville KY Energy Mary
T.
Meager
Aqua3c
Facility
Retrofit
including
energy
efficient
HVAC,
solar
water
hea3ng
system
and

building
insula3on 










2,600,000
 25
Louisville KY Energy Metro
Archives
&
LMPD
Property
Building
Green
Roof
–
Replace
the
exis3ng
built‐up
roof
w/
a
new
Green

Roof;
promo3ng
environmental
sustainability
and
environmentally
beneficial
ini3a3ves.
Green
roofs
help

capture
storm
water
run‐off
that
otherwise
wou 












785,000
 28
Louisville KY Energy Metro
Development
Center
Solar
Panel
System:

install
south
facing
solar
panels
for
the
building.
The
panels

will
be
used
to
supply
domes3c
hot
water
for
the
building.
Addi3onally
,
solar
panels
will
be
u3lized
to
produce

electricity
for
the
building. 










1,000,000
 28
Louisville KY Energy Fairdale
Health
Center
Geothermal
HVAC
and
Playtorium
–
Replace
the
exis3ng
energy
inefficient
and

unreliable
HVAC
systems
with
new
geothermal
heat
pump
systems,
thus
lowering
the
hea3ng
bills
for
the

building
up
to
50%
&
lowering
cooling
bills
up
to
30 












580,000
 30
Louisville KY Energy Park
Hill
Green
Strategies
•Building
–
Update
Metro‐owned
building
to
green
retro‐fit;
include
renewable
energy
techniques

•Rhodia
Site
(Metro‐owned
property)–
Brownfield/storm
water
management
demonstra3on
area

•Urban
forests
as
carbon
sequestra3o 










1,650,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Louisville KY Energy Urban
Gov.
Center
810
Green
Roof
‐
Replace
the
exis3ng
built‐up
roof
w/
a
new
Green
Roof;
promo3ng

environmental
sustainability
and
environmentally
beneficial
ini3a3ves.
Green
roofs
help
capture
storm
water

run‐off
that
otherwise
would
enter
the
sewer 










1,000,000
 30
Louisville KY Energy Memorial
Auditorium
HVAC
Replacement
–
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system

with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced

comfort
and
reduced
first
cost
and
opera3ng
ex 










1,500,000
 36
Louisville KY Energy Hall
of
Jus3ce
HVAC
Replacement
‐
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
with
a

new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
comfort

and
reduced
first
cost
and
opera3ng
expens 










2,000,000
 40
Louisville KY Energy Metro
Louisville
Solar
Street
Ligh3ng
–
Replacement
of
exis3ng
electric
street
ligh3ng
to
solar
powered
street

lights 










2,000,000
 40
Louisville KY Energy Retrofit
Golf
Clubhouses
including
solar
water
hea3ng
systems,
efficient
ligh3ng,
geothermal
HVAC,
building

insula3on,
etc.
at
Shawnee,
Seneca,
Bobby
Nichols,
Cherokee,
Crescent
Hill,
Sun
Valley
and
Iroquois
Parks 










2,100,000
 40
Louisville KY Energy Recycling
Program
Enhancement
Equipment:

Purchase
and
distribu3on
of
100,000
programmable
recycling

carts
to
enhance
recycling
par3cipa3on
&
thereby
reduce
landfill
volumes. 










7,000,000
 100
Louisville KY Energy Air
Pollu3on
Control
Headquarters
Renova3on
Renova3on
and
new
construc3on
to
consolidate
the
local
air

pollu3on
regulatory
agency
into
a
centrally
located
facility.
Green
building
prac3ces,
solar
collec3on
and
a

geothermal
HVAC
system
will
be
inclu 










2,800,000
 120
Louisville KY Energy Zoo
Energy
Efficiency
Improvements
Replace
single
pane
windows,
install
insula3on
and
improve
heat
delivery
systems;
install
green
roofs;
enhance

the
water
and
energy
efficiencies
to
the
collec3on
life
support
systems











5,000,000
 250
Louisville KY Energy Construct
a
methane
produc3on
facility
on
the
zoo
campus
that
is
powered
by
methane
gas
from
animal

waste.
 








15,000,000
 750
Louisville KY Housing Drainage
and
sewer
line
replacement
at
Parkway
Place,
a
600
unit
Public
Housing
Apartment
structure
located

at
13th
and
Hill 












150,000
 2
Louisville KY Housing Generator
replacement
on
the
Bishops
Lane
Senior
Living
Facility 












150,000
 2
Louisville KY Housing Replace
the
generator
at
Lourdes
Hall,
a
62
unit
Senior
Living
Facility 












150,000
 2
Louisville KY Housing Replace
the
emergency
no3fica3on
intercom
system
at
Lourdes
Hall,
a
62
unit
Senior
Living
Facility 












200,000
 3
Louisville KY Housing Concrete
stair
replacement
at
Public
Housing
Apartment
units
(550
Apartments) 












100,000
 5
Louisville KY Housing Replacement
of
the
parapets
(post
and
guardrail
like
structures)
on
the
Dosker
Manor
Senior
Living
Center,
a

structure
with
over
685
units. 












400,000
 5
Louisville KY Housing Replacement
of
the
windows
at
St.
Mar3ns,
a
public
housing
apartment
unit
on
the
na3onal
history
registry 












296,200
 5
Louisville KY Housing Upgrading
elevators
at
Avenue
Plaza
Senior
Living
Center 












400,000
 5
Louisville KY Housing Upgrading
elevators
at
the
Dosker
Manor
Senior
Living
Center 










2,200,200
 5
Louisville KY Housing Roof
replacement
on
the
Tonini
Building,
a
historic
structure
owned
by
the
Housing
Authority 












320,000
 6
Louisville KY Housing Renova3on
and
conversion
of
the
remains
of
DuValle
Liquors,
a
liquor
store
purchased
by
the
Housing

Authority
to
remove
blight 












250,000
 10
Louisville KY Housing Replacement
of
the
roof
on
the
Vine
Street
public
housing
unit
with
a
green
roof 












300,000
 10
Louisville KY Housing Cabinet
replacement
at
200
scafered
site
loca3ons 












200,000
 12
Louisville KY Housing Roof
replacement
at
50
scafered
site
loca3ons 












200,000
 12
Louisville KY Housing Roof
replacement
at
Public
Housing
Apartment
units
(550
Apartments) 












150,000
 12
Louisville KY Housing Roof
replacement
on
the
Bishops
Lane
Senior
Living
Facility 












190,000
 12
Louisville KY Housing Renova3on
and
Conversion
of
537
East
Breckenridge
back
to
a
single
family
home 












225,000
 20
Louisville KY Housing Stove,
and
gas
line
conversion
to
electric
for
Parkway
Place,
a
600
unit
Public
Housing
Apartment
structure

located
at
13th
and
Hill 












900,000
 20
Louisville KY Housing The
construc3on
of
three
lease‐to‐own
houses 












375,000
 20
Louisville KY Housing The
building
of
a
2‐story
community
center
for
seniors
for
non
sports
related
ac3vi3es
at
the
Liberty
Green

Housing
Redevelopment 










3,350,000
 30
Louisville KY Housing Demoli3on
of
16
public
housing
units
at
the
Iroquois
Public
Housing
Project 










1,328,000
 200
Louisville KY Public
Safety Dash‐Mounted
Mobile
Video
Cameras
for
Police
Patrol
Vehicles:

LMPD
installs
dash‐mounted
video
cameras
in

marked
police
vehicles
to
record
interac3ons
between
officers
and
ci3zens.

The
current
model
uses
digital

recording
technology
and
interfaces
wit 












780,000

Louisville KY Public
Safety Mobile
Data
Terminals
(MDTs)
for
Police
Vehicles:
LMPD
needs
to
replace
350
MDTs
to
ouzit
new
patrol

vehicles
and
upgrade
older
equipment.
MDTs
are
used
by
officers
to
view
and
respond
to
calls
for
service,

paperless
repor3ng,
electronic
cita3ons,
view 










2,557,000

Louisville KY Public
Safety Records
Management
System
(RMS)
upgrade:
add
addi3onal
sobware
to
interface
with
records
management

system.
One
program
will
allow
more
efficient
tracking
of
purchases
by
pawn
brokers
and
scrap
metal
dealers.

This
will
allow
inves3gators
to
track
possi 












410,400

Louisville KY Public
Safety TASER
Cameras:

LMPD
has
1120
Taser
Electronic
Control
Weapons
deployed
to
officers.

Taser
Interna3onal

offers
an
upgrade
that
replaces
the
standard
bafery
with
a
bafery
and
camera.

The
camera
captures
the

interac3on
between
the
officer
and
suspect, 












425,544

Louisville KY Public
Safety LMPD
Mounted
Patrol
Renova3on
&
Addi3on
‐

Moderniza3on
of
the
original
park
riding
stable
barn
into
a

headquarters
for
the
mounted
patrol. 












200,000
 12
Louisville KY Public
Safety Fire
Headquarters
Elevator
‐
Install
new
elevator
for
Handicapped
Access
to
2nd
Floor 












270,000
 18
Louisville KY Public
Safety LMPD/LMCD
Jail
Smoke
Evacua3on/HVAC
System
Renovate
and
install
new
code
required,
life
safety
smoke

evacua3on
system
for
inmate
housing
on
the
third
floor
of
the
police
headquarters
building.
This
project
will

also
replace
exis3ng
HVAC
system
w/
a
new 












750,000
 20
Louisville KY Public
Safety Louisville
Fire
Academy
Addi3on
–
a
new
a
mul3‐purpose
building
w/
two
addi3onal
classrooms
will
be
added

to
the
campus 












500,000
 44
Louisville KY Public
Safety COPS
Hiring
Grants
(50
Officers):
LMPD
would
like
to
hire
to
full
authorized
strength
of
1257
sworn
personnel,

then
hire
an
addi3onal
50
officers
funded
by
COPS
hiring
grants. 










2,443,517
 50
Louisville KY Public
Safety Firearms
Training
Center
(FTC)
Expansion:

LMPD
is
currently
expanding
FTC
from
a
12
lane
facility
to
a
24
lane

facility.

The
expansion
is
necessary
to
accommodate
a
merged
police
force
and
several
other
peer
agencies.

 










1,800,000
 99
Louisville KY Public
Safety Ashland
Fire
Sta3on
10
Construc3on
of
a
new
4‐bay
District
Fire
Sta3on
consis3ng
of
twelve
sleeping
rooms,

offices,
lounge,
and
support
spaces.
This
facility
will
also
include
a
fueling
center. 










4,000,000
 153
City State Program Project
Descrip3on Funding
Required Jobs
Louisville KY Public
Safety Public
Safety
Radios
–
Metro
Louisville
is
currently
construc3ng
the
infrastructure
for
an
800
Mhz
interoperable

radio
system
for
first
responders.
Aber
this
system
is
completed
the
radios
must
be
purchased
&
programmed

to
provide
common
radio
frequenci 








11,000,000
 700
Louisville KY Schools Cochrane
School
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing;

refurbishing
of
ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and

lock
conversion. 










1,849,200
 62
Louisville KY Schools Field
Elementary
Construc3on:
Construc3on
of
playtorium
and
renova3on
of
exis3ng
Gym
to
new
Media

Center
and
renova3on
of
exis3ng
media
center
to
Art/Resource
rooms
and
associated
work 










1,707,750
 62
Louisville KY Schools Hite
Elementary:
Removal
of
portables,
roofing,
window
replacement,
floor
3le,
pain3ng,
ceiling
&
lights
in

corridors
&
classrooms,
paving,
and
lock
conversion. 










1,535,250
 62
Louisville KY Schools Johnsontown
Road
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,

ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock

conversion. 










1,806,650
 62
Louisville KY Schools Kennedy
Montessori
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,

ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock

conversion. 










2,107,950
 62
Louisville KY Schools King
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
lights

in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. 










1,702,000
 62
Louisville KY Schools Middletown
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling

&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. 










2,018,250
 62
Louisville KY Schools Mill
Creek
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. 










2,119,450
 62
Louisville KY Schools Rangeland
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. 










2,282,750
 62
Louisville KY Schools Sanders
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. 










2,390,850
 62
Louisville KY Schools Trunnell
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. 










2,507,000
 62
Louisville KY Schools Waferson
Elementary
:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion
and

restroom
addi3on. 










3,377,550
 62
Louisville KY Schools Wheeler
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. 










1,711,200
 62
Louisville KY Schools Wilkerson
Tradi3on
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,

ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock

conversion. 










1,844,600
 62
Louisville KY Schools Wilt
Elementary:
Removal
of
portables,
roofing,
window
replacement,
floor
3le,
pain3ng,
Ceiling
&
lights
in

corridors
&
classrooms,
paving,
and
lock
conversion. 










2,179,250
 62
Louisville KY Schools Greenwood
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling

&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
&
lock
conversion;

Purchasing
of
a
new
elevator. 










2,156,250
 65
Louisville KY Schools Roosevelt
Perry
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,

ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
lock
conversion,

and
elevator. 










3,059,000
 65
Louisville KY Schools Smyrna
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
lock
conversion
and

elevator. 










3,320,050
 65
Louisville KY Schools Wellington
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
lock
conversion,
and

elevator. 










3,007,250
 65
Louisville KY Schools Wheatley
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&

lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion.

New

Elevator 










2,099,900
 65
Louisville KY Schools Kammerer
Middle
School
Phase
1
Renova3on:
HVAC
replacement
or
upgrade,
roofing,
ceiling
&
lights
in

corridors
&
classrooms,
windows,
pain3ng,
paving,
floor
3le
replacement,
office
renova3on,
and
lock

conversion. 










6,681,500
 112
Louisville KY Schools Southern
HS
Phase
1
Renova3on:
HVAC
replacement
or
upgrade,
roofing,
ceiling
&
lights
in
corridors
&

classrooms,
windows,
lock
conversion. 








16,008,000
 112
Louisville KY Schools Valley
High
School
Phase
1
Renova3on
&
construc3on
of
a
new
auditorium
with
gymnasium:
HVAC

replacement
or
upgrade,
roofing,
ceiling
&
lights
in
corridors
&
classrooms,
windows,
pain3ng,
paving,
floor
3le

replacement,
office
renova3on,
and
lock
conve 








23,581,500
 112
Louisville KY Schools Noe
Middle
School
Phase
1
Renova3on:
HVAC
replacement
or
upgrade,
roofing,
ceiling
&
lights
in
corridors
&

classrooms,
windows,
pain3ng,
paving,
floor
3le
replacement,
office
renova3on,
lock
conversion,
and
elevator

replacement. 










9,407,000
 115
Louisville KY Schools Purchase
of
school
buses
older
than
the
14‐year
replacement
cycle:
includes
154
66‐passenger
regular
buses,

38
52‐passenger
buses
with
ECE
and
A/C,
18
passenger
buses
with
libs
and
five
22‐passenger
ECE
buses 








15,744,981
 430
Louisville KY Streets/Roads Cedar
Creek
–
0.92

miles
(Bates
to
Heritage
Creek)Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and

resurface
at
the
loca3ons
below: 












250,000
 7
Louisville KY Streets/Roads Mt
Washington
–
1.0
miles
(Rocky
Road
to
Cedar
Creek)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 












350,000
 7
Louisville KY Streets/Roads Ohio
River
Levee
Trail
–
13,000
linear
feet
between
Riverside
Historic
Site
and
Mill
Creek
genera3ng
sta3on 












390,000
 7
Louisville KY Streets/Roads Rehl
Rd
‐
0.40
miles
(S.
Pope
Lick
to
S.
English
Sta3on)

Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 












200,000
 7
Louisville KY Streets/Roads Rehl
Road

‐
retaining
wall
near
Pope
Lick
Roadways
are
sliding
down
adjacent
slopes.

We
will
excavate
and
re‐
build
roadside
and
improve
drainage
to
stabilize
roadways. 












250,000
 7
Louisville KY Streets/Roads Wibble
Hill
Rd

‐
0.71
miles
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 












400,000
 7
Louisville KY Streets/Roads Blevins
Gap
Bridge
Replacement
(2700) 












140,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Louisville KY Streets/Roads Blevins
Gap
Bridge
Replacement
(4410) 












200,000
 10
Louisville KY Streets/Roads Broad
Run
Bridge
Replacement
(9220)N 












135,000
 10
Louisville KY Streets/Roads Broad
Run
Bridge
Replacement
(9220)S 












135,000
 10
Louisville KY Streets/Roads Broad
Run
Bridge
Replacement
(9403) 












135,000
 10
Louisville KY Streets/Roads Broad
Run
Road
at
Broad
Run
Creek
(C‐168) 












500,000
 10
Louisville KY Streets/Roads Broad
Run
Road
over
Back
Run
Creek
(C‐169) 












500,000
 10
Louisville KY Streets/Roads Clark
Sta3on
Road
Bridge
Replacement
(2202) 












125,000
 10
Louisville KY Streets/Roads Easum
Rd
‐

1.17
miles
(Billtown
to
Chenoweth)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and

resurface. 












500,000
 10
Louisville KY Streets/Roads Factory
Lane
–
1.54
miles
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 










1,000,000
 10
Louisville KY Streets/Roads Fairmount
Rd
–
0.71
miles
(Bardstown
Rd.
to
Gentry
Ln.)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 












500,000
 10
Louisville KY Streets/Roads Independence
School
Road

‐
2.23
miles
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 










1,250,000
 10
Louisville KY Streets/Roads Lover
Ln
–
1.44
miles
(Veterans
to
Billtown)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 










1,000,000
 10
Louisville KY Streets/Roads Lyndon
Lane
over
Middle
Fork
of
Beargrass
Creek 












450,000
 10
Louisville KY Streets/Roads Mitchell
Hill
Road
Roadways
are
sliding
down
adjacent
slopes.

We
will
excavate
and
re‐build
roadside
and

improve
drainage
to
stabilize
roadways. 












250,000
 10
Louisville KY Streets/Roads Mud
Lane
–
1.0
mile
(Blue
Lick
Road
to
Bier
Dr)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 












700,000
 10
Louisville KY Streets/Roads New
Cut
over
Bee
Lick
Creek
Bridge
Replacement 












275,000
 10
Louisville KY Streets/Roads Old
Heady
over
Drakes
Branch
Bridge
Replacement 












450,000
 10
Louisville KY Streets/Roads Old
Taylorsville
Road
Bridge
Replacement
(5601) 












100,000
 10
Louisville KY Streets/Roads Old
Westport
over
Goose
Creek
Bridge
Replacement 












275,000
 10
Louisville KY Streets/Roads Poplar
Lane
–
1.13
miles
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 












700,000
 10
Louisville KY Streets/Roads Rehl
Rd

‐
1.3
miles
(Blankenbaker
to
Snyder
Freeway)

Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 












525,000
 10
Louisville KY Streets/Roads River
Road

Bridge
Replacement
(7505) 












200,000
 10
Louisville KY Streets/Roads S.
English
Sta3on
Rd
–
2.10
miles
(Poplar
Ln
to
Echo
Tr.)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 










1,250,000
 10
Louisville KY Streets/Roads S.
Pope
Lick
Rd.
Bridge
Replacement
(2213) 












175,000
 10
Louisville KY Streets/Roads Seatonville
Rd
Bridge
Replacement
(11221) 












155,000
 10
Louisville KY Streets/Roads Stout
Road
at
Floyds
Fork
Tributary

Bridge
Replacement 












125,000
 10
Louisville KY Streets/Roads Urton
Lane
Bridge
Replacement
(12509) 












145,000
 10
Louisville KY Streets/Roads Blevins
Gap
Bridge
Replacement
(3907) 












145,000
 12
Louisville KY Streets/Roads Blevins
Gap
Bridge
Replacement
(4021) 












175,000
 12
Louisville KY Streets/Roads South
English
Sta3on
Bridge
Replacement
(1905) 












175,000
 12
Louisville KY Streets/Roads Broad
Run
Road:

Roadways
are
sliding
down
adjacent
slopes.

We
will
excavate
and
re‐build
roadside
and

improve
drainage
to
stabilize
roadways. 










1,000,000
 15
Louisville KY Streets/Roads Clark
Sta3on
Road
Bridge
Replacement
.5
M
S 












225,000
 15
Louisville KY Streets/Roads Johnson
Road
–
2.0
miles
(Aiken
Road
to
CSX
RR)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 










1,500,000
 15
Louisville KY Streets/Roads Old
Taylorsville
over
Dunbar
Creek
Bridge
Replacement 












275,000
 15
Louisville KY Streets/Roads Mill
Creek
shared
use
path
–
24,000
linear
feet
between
Sylvania
Park
and
Sun
Valley
Park 










1,200,000
 25
Louisville KY Streets/Roads Old
Heady

‐
1.7
miles(Taylorsville
to
Snyder
Freeway)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: 










1,300,000
 25
Louisville KY Streets/Roads Easun
Road
Bridge
Replacements 












495,000
 30
Louisville KY Streets/Roads Penile
Road
Bridge
Replacements 












425,000
 30
Louisville KY Streets/Roads Southern
Parkway
shared
use
path 










1,620,000
 35
Louisville KY Streets/Roads A.
B.
Sawyer
greenway
and
connector
trails 












560,000
 40
Louisville KY Streets/Roads Bearcamp
Road

Bridge
Replacements 












610,000
 40
Louisville KY Streets/Roads Old
Clark
Sta.
Rd.
Bridge
Replacement
2.3
M
E 












720,000
 40
Louisville KY Streets/Roads Chenoweth
Run
Bridge
Replacements 












775,000
 50
Louisville KY Streets/Roads Extension
of
Air
Commerce
Drive:
construc3on
of
a
main
boulevard,
an
access
bridge
and
the
necessary

u3li3es
to
sustain
commercial
and
light
industrial
development
at
the
Renaissance
Zone
South
Business
Park 










3,000,000
 180
Louisville KY Streets/Roads New
Sidewalks
Proposed
funding
would
allow
for
construc3on
of
approximately
100,000
linear
feet
of
new

sidewalk
in
non‐CDBG
eligible
areas. 










2,000,000
 200
Louisville KY Streets/Roads Sidewalk/Curb
Replacement:
Proposed
funding
would
allow
for
replacement
of
approximately
100,000
linear

feet
of
sidewalk/curb
in
non‐CDBG
eligible
areas. 










4,000,000
 400
Louisville KY Streets/Roads Street
Resurfacing:
Proposed
funding
would
allow
for
143
miles
of
roads
to
be
resurfaced
in
non‐CDBG
eligible

areas
within
one
season,
which
is
approximately
8
months
out
of
the
year. 








10,000,000
 1200
Louisville KY Transit KIPDA
Vanpool
Program
‐
20
Ticket
to
Ride
vehicles
to
promote
addi3onal
vanpooling
to
regional
employers 












420,000
 3
Louisville KY Transit Union
Sta3on
Energy
Efficiency
Project
–
Replace
highly
inefficient
and
failing
chiller,
boiler,
system
controls,

refurbish
fan
coil
units,
and
refurbish
windows
in
1890
landmark
building. 












450,000
 8
Louisville KY Transit Union
Sta3on
Baggage
Building
Renova3on
‐
Renovate
currently
uninhabitable
second
floor
of
historic
building

adjacent
to
Union
Sta3on.
Includes
refurbishing
windows
and
doors,
adding
HVAC,
insula3on,
refurbish
slate

and
architectural
metal
roofing,
an 












500,000
 9
Louisville KY Transit Replace
Deteriorated
Sidewalks
and
Curbs:
Improve
safety
and
accommodate
pedestrian
traffic
at
four
priority

blocks
targe3ng
deteriorated
sidewalks
and
curbs
in
bad
condi3on
and
as
pedestrian
traffic
to
the
new
Arena

increases.

The
poor
condi3ons
will 










1,375,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Louisville KY Transit Park
Hill
Transit
Improvements
(economic
development)
–
Develop
a
Park
Hill‐University
of
Louisville

circula3on
route
that
provides
befer
mobility
for
workers/residents/students
to
connect
to
jobs
and
the

University
campus
with
possible
linkage
to
futur 










3,500,000
 15
Louisville KY Transit Broadway
Division
Bus
Storage
Building
Renova3on
–
Replace
57,000
s.f.
roof
system
with
green
roof,
replace

failed
overhead
doors,
clean
and
paint
exterior
walls,
replace
electrical
panels,
ligh3ng,
repair
paving,
and
add

fire
alarm
system. 










1,000,000
 17
Louisville KY Transit Park
Hill
At‐Grade
Rail
Crossing
Improvements:
Improve
safety
and
accommodate
car
and
truck
traffic
at
four

crossings,
includes
protec3ve
lights
and
gates.

Project
helps
improve
access
to
Park
Hill
industrial
corridor 










3,000,000
 20
Louisville KY Transit TARC
Bus
Storage
Building
Solar
Roof
‐
Replace
30
year
old
built
up
roofing
on
144,000
sq.
b.
bus
storage

building
at
Union
Sta3on
with
high
albedo
“white”
roof
and
80
kW
photovoltaic
system. 










1,972,000
 40
Louisville KY Transit Purchase
diesel
fuel
to
offset
increased
service
demand 










4,000,000
 53
Louisville KY Transit Riverwalk
Mul3‐modal
Facility
Reconstruc3on:
Project
involves
bank
stabiliza3on
along
Ohio
River
&

reconstruc3on
of
mul3‐modal
facility
that
expands
access
to
neighborhoods
and
bus
services. 










1,000,000
 80
Louisville KY Transit Expand
Hybrid
Bus
Fleet
‐
Purchase
of
(20)
addi3onal
hybrid
buses
to
bring
fleet
total
to
32
for
expanded

express
and
local
service.

Hybrid
buses
are
over
20%
more
fuel
efficient,
and
emit
30%
fewer
pollutants
than

standard
diesel
buses. 








10,500,000
 84
Louisville KY Transit TARC
Maintenance
Annex
‐
Construct
Union
Sta3on
(plans
approved
&
ready
to
go)
annex
to
expand
and

upgrade
maintenance
and
training
facili3es.

Project
includes,
green
roof,
bio‐swale,
grey
water
system,
LEED

Silver
cer3fica3on
and
innova3ve
12
volt 










6,000,000
 91
Louisville KY Transit Intermodal
Transit
Center
–
Central:
This
project
involves
Louisville
Metro
Central
Business
District
intermodal

transit
sta3on
one
facility

This
new
transit
center
will
provide
access
to
TARC
routes,
local
taxi,
bicycle
parking

and
storage,
and
transit 










3,000,000
 120
Louisville KY Transit Intermodal
Transit
Center
–
Satellite:
This
project
involves
two
satellite
Louisville
Metro
intermodal
transit

sta3ons.
New
transit
centers
will
provide
access
to
TARC
routes,
local
taxi,
bicycle
parking
and
storage,
and

transit
oriented
retail
at
street 










3,000,000
 120
Louisville KY Water Water
Quality
Lab
Informa3on
System:
Upgrade
exis3ng
water
quality
lab
informa3on
system
to
comply
with

regulatory
repor3ng
and
future
drinking
water
regula3ons. 










1,000,000
 2
Louisville KY Water Radio
and
Data
Communica3ons
System
Upgrade:
Upgrade
the
two‐way
radio
and
data
communica3on
system

for
water
u3lity
and
emergency
opera3ons.

New
digital
system
will
link
to
MetroSafe
Emergency
Radio

communica3ons
system.

Current
system
becomes
obs 












500,000
 4
Louisville KY Water Water
System
Security
Access:
Upgrade
controlled
access
system
with
digital
video,
controlled
electronic

access,
and
proximity
readers.

System
will
enhance
security
at
water
treatment
plants,
pumping
sta3ons,

distribu3on
centers,
and
corporate
office.
 












500,000
 4
Louisville KY Water Chapeze
Road
–
Highway
245
Main
Extension:
Construct
2.8
miles
of
16‐inch
transmission
main
in
Chapeze

Lane
from
I‐65
east
and
south
to
Highway
245,
and
along
Highway
145
to
Happy
Hollow
Road. 










1,200,000
 10
Louisville KY Water Transylvania
Beach
Sewers:
Install
sewers
to
20
homes
currently
on
sep3c
tanks
along
Transylvania
Beach.

Elimina3ng
sep3c
tanks
in
this
wellhead
protec3on
area
will
protect
Louisville's
drinking
water
supply
from

source
water
contamina3on. 










1,000,000
 10
Louisville KY Water Historic
Zorn
Pump
Sta3on
#1
Building
and
Site
Improvements:

Rehabilitate
the
exterior
of
the
historic
pump

sta3on
and
construct
site
improvements
to
improve
drainage,
access,
parking. 










1,000,000
 12
Louisville KY Water Highway
480
Regional
Water
Storage:
Construct
new
drinking
water
storage
tank
on
Highway
480
in
Bullif

County
to
provide
regional
water
service
in
Bullif
and
Nelson
County. 










2,000,000
 16
Louisville KY Water Regional
Water
Storage:
Construct
new
drinking
water
storage
tank
on
Highway
in
Bullif
County
to
provide

regional
water
service
in
Bullif
and
Nelson
County 










2,000,000
 16
Louisville KY Water Highway
245
Regional
Water
Supply:
Construct
3.6
miles
of
16
inch
transmission
main
to
provide
regional

water
service
to
Bullif
and
Nelson
County 










2,500,000
 20
Louisville KY Water Clean
and
Reline
Crescent
Hill
Raw
Water
Reservoirs
(north
and
south):
Remove
accumulated
river
sediment

from
the
105
MG
raw
water
reservoirs
at
Crescent
Hill,
properly
dispose
of
sediments,
and
repair
synthe3c

liner
once
completed 










3,000,000
 24
Louisville KY Water Crescent
Hill
Sobening
Basin
Renova3on:
Rehabilitate
sobening
basins
at
Crescent
Hill
Water
Treatment
Plant

to
comply
with
2012
drinking
water
regula3ons 










3,000,000
 24
Louisville KY Water Crescent
Hill
Slate
Roof
Replacement:
Replace
slate
roof
on
100
year
old
Crescent
Hill
Pump
Sta3on 










2,500,000
 25
Louisville KY Water Zorn
Pump
Sta3on
Power
System
Renova3on:
Replace
aging
13KV
and
480
Volt
power
system
at
Zorn
Pump

Sta3on
#2
and
#3
to
improve
reliability
and
reduce
maintenance 










2,500,000
 25
Louisville KY Water Interstate
65
Regional
Water
Supply,
Phase
I:
Construct
2.9
miles
of
24‐inch
transmission
main
from
Mud
Lane

to
John
Harper
Highway
and
along
John
Harper
Highway
to
Preston
Highway. 










3,500,000
 28
Louisville KY Water Interstate
65
Regional
Water
Supply,
Phase
II:
Construct
3.0
miles
of
24‐inch
transmission
main
along
the

Preston
Highway
(Hwy
61)
from
John
Harper
Highway
to
the
Seflers
Point
elevated
storage
tank. 










4,100,000
 33
Louisville KY Water Ft.
Knox/Hardin
County
Regional
Water
Supply:
Construct
3.2
miles
of
24
inch
transmission
main
to
supply

wholesale
water
service
to
Ft
Knox
and
Hardin
County 










4,500,000
 36
Louisville KY Water Water
Mains
Rehabilita3on:
Install
cathodic
protec3on
on
75
miles
of
water
distribu3on
main
(duc3le
and
cast

iron)
to
extend
pipe
life
and
reduce
water
main
breaks. 










4,500,000
 36
Louisville KY Water Interstate
265
Transmission
Supply:
2.8
miles
of
36‐inch
transmission
main 










5,000,000
 40
Louisville KY Water Supply
Potable
Water
to
Unserved
Customers
in
Jefferson,
Bullif
and
Oldham
County:
Extend
7.1
miles
of

water
main
to
customers
in
Bullif
and
Oldham
County
to
provide
unserved
customers
with
a
safe
reliable

source
of
potable
water 










4,500,000
 45
Louisville KY Water Interstate
65
Regional
Water
Supply,
Phase
III:
Construct
9.3
miles
of
16‐inch
transmission
main
from
Chapeze

Lane
to
the
Bullif‐Hardin
County
Line.

Project
will
include
construc3on
of
a
new
5
MGD
booster
pump
sta3on.











7,000,000
 56
Louisville KY Water Water
Main
Replacement:
Replace
9.5
miles
of
water
main
to
improve
water
quality,
fire
hydrant
flow
and

reduce
maintenance;
work
includes
replacement
of
the
water
main
in
the
Fincastle
neighborhood. 










6,500,000
 65
Louisville KY Water Interstate
64
Regional
Water
Supply:
Construct
5.4
miles
of
36
inch
transmission
main
along
I‐64
from
Gene

Snyder
Freeway
to
Shelby
County
Line
to
provide
regional
water
service
to
eastern
Jefferson
County
and

western
Shelby
County. 








11,700,000
 94
Louisville KY Water Billtown
Road
Interceptor:
This
project
consists
of
the
construc3on
of
approximately
12,000
linear‐feet
of
36‐
inch
gravity
sewer.
This
project
is
a
cri3cal
component
necessary
to
con3nue
to
allow
growth
and
enable

development
previously
unavailable 










7,500,000
 100
Louisville KY Water Champions
Park
Development:
a
design
that
captures
and
treats
onsite
water
runoff
from
surrounding

redeveloped
roadways. 










6,000,000
 100
City State Program Project
Descrip3on Funding
Required Jobs
Louisville KY Water Shinks
Branch
Pump
Sta3on
and
Force
Main:
This
project
consists
of
construc3ng
a
two
million
gallon
per
day

pump
sta3on
and
approximately
24,000
liner‐feet
of
force
main
to
convey
wastewater
to
the
Cedar
Creek

Wastewater
Treatment
Facility. 








10,000,000
 100
Louisville KY Water Lead
Service
Line
Renewals:
Replace
and/or
rehabilitate
10,000
lead
service
lines
to
improve
water
quality
to

homes
in
Jefferson
County 








20,000,000
 200
Louisville KY Water West
County
Waste
Water
and
Treatment
Plant
Wet
Weather
Treatment
Facility:
provides
for
the
construc3on

of
a
new
Wet
Weather
Treatment
Facility,
modifica3ons
to
the
new
exis3ng,
Grit
Handling
Building,
a
new

aera3on
basin,
six
new
clarifiers,
two
new 








37,300,000
 225
Louisville KY Water West
County
Waste
Water
and
Treatment
Plant
Pump
Sta3on
Improvements
and
Addi3ons:
The
scope
will

provide
modifica3ons
to
the
Raw
Sewage
Pump
Sta3on
(RSPS),
a
new
Screening
Facility,
a
new
Wet
Weather

Pump
Sta3on
(WWPS 








35,040,000
 250
Louisville KY Water Hikes
Lane
Interceptor
Sewer:
One
of
a
series
of
large
diameter
interceptor
sewers
that
will
be
constructed
to

relieve
basement
flooding
of
hundreds
of
homes
in
the
Beechwood
Village/
Hikes
Lane
areas
during
wet

weather.
 










8,000,000
 300
Louisville KY Water Northern
Ditch
Interceptor
Sewer:
One
of
a
series
of
large
diameter
interceptor
sewers
that
will
be
constructed

to
relieve
basement
flooding
of
hundreds
of
homes
in
the
Beechwood
Village/
Hikes
Lane
areas
during
wet

weather.
 










7,000,000
 300
Louisville KY Water Western
Pumping
Sta3on
Improvement:
Will
fund
a
full
replacement
of
seven
pumps
and
revamp
electrical

service
and
emergency
power
to
the
sta3on.
The
Western
Pumping
Sta3on
is
the
first
FPS
of
16
in
Jefferson

County
to
be
called
into
service
 








13,000,000
 300
Louisville KY Water Zoo
Sewer
Repair
and
Improvements:
address
repairs
to
zoo
sewer
system
first
iden3fied
in
1999;
construct
an

effluent
handling/treatment
system;
build
a
gray
water
recycling
facility

 








13,000,000
 300
Shelbyville KY Public
Safety Construc3on
of
Fire
Sta3on
Number
Three.

The
Fire
Sta3on
will
be
located
on
Warriors
Way,
between
two

schools
in
the
Northwest
corner
of
the
city. 












600,000
 6
Shelbyville KY Water Midland
Gravity
Sewer
Porject.

This
project
will
extend
gravity
sewers
into
the
Arlington/Ardore
Subdivision

areas.

In
doing
so,
this
project
will
eliminate
73
failing
sep3c
tanks,
extend
service
for

429
furture

development
residental
lots,
75
acres
o 










1,815,000
 15
Shelbyville KY Water Shelby
County
Interstate
64
Regional
Water
Supply:
Construct
22.5
miles
of
24
inch
transmission
main,
10
MGD

booster
pump
sta3on
and
1
MG
storage
tank
to
provide
regional
water
supplies
to
Shelbyville,
Shelby
County,

Frankfort,
and
Franklin
County. 








39,600,000
 317
Alexandria
 LA CDBG Sidewalk
construc3on
on
Masonic
Drive
(US
165‐B)
from
Texas
Avenue
to
Lee
Street,
located
in
a
CDBG
target

area.

Presently
no
sidewalks
exist.

This
corridor
houses
ball
parks,
the
zoo,
City
Park,
tennis
courts
and
other

venues
for
children's
and
other
 












575,000
 6
Alexandria
 LA CDBG Ditch
enclosure
and
sidewalk
construc3on
(single‐side
5'
walk
approximately
1600'
in
length)along
Enterprise

Road,
a
CDBG
target
area,
to
improve
pedestrian
safety. 












750,000
 8
Alexandria
 LA CDBG Monroe
Street
sidewalk
improvements.
Monroe
Street
is
in
a
CDBG
target
area
and
is
used
by
a
large
number

of
children
to
walk
to
a
neighborhood
elementary
school
and
a
junior
high
school.
Safety
for
pedestrians
would

be
greatly
enhanced 












600,000
 8
Alexandria
 LA Energy Energy
Retrofit
of
City
Hall
and
Consolidated
Compound
‐
energy
retrofit
for
2
major
City
owned
opera3onal

facili3es. 










5,000,000
 4
Alexandria
 LA Public
Safety Fire
arms
training
simulator
for
training
police
offiers. 














84,647

Alexandria
 LA Public
Safety Police/fire
driving
simulator
for
training
of
fire
and
police
officers. 












102,000

Alexandria
 LA Public
Safety Purchase
ladder
truck
for
service
atFire
Sta3on
#%
to
address
an3cipated
commercial
growth
trends
in
western

por3on
of
city. 












380,000

Alexandria
 LA Public
Safety purchase
of
mobil
police
command
center
for
responding
to
emergency
situa3ons. 












550,000

Alexandria
 LA Public
Safety Renova3on
to
Fire
Sta3on
#4,
on
Masonic
Drive
to
inprove
fire
protec3on
for
the
district
and
further

implementa3on
of
the
fire
sta3on
reposi3oning
study. 










2,300,000
 25
Alexandria
 LA Public
Safety Construc3on
of
the
I‐49
corridor
through
Alexandria
seriously
disrupted
fire
response
3me.

The
city
undertook

a
fire
sta3on
reposi3oning
study
to
assess
the
needs
of
fire
response.

The
study
concluded
the
need
to

relocate
and
construct
4
new
fire
st 








12,000,000
 60
Alexandria
 LA Streets/Roads City
Park
Historical
Bridge
Preserva3on;
par3al
reconstruc3on
and
preserva3on
of
two
historical
bridges
on

North
City
Park
Blvd. 












300,000
 5
Alexandria
 LA Streets/Roads Versailles
Boulevard,
Phase
2,
Package
5
‐
construc3on
of
new
three‐lane
concrete
roadway
with
subsurface

drainage
and
u3li3es
(gas,
water
and
sewer);
approximate
length
of
1600' 










1,250,000
 10
Alexandria
 LA Streets/Roads Jackson
Street
(LA
1208‐3)
and
Horseshoe
Drive
Intersec3on
Improvements;
reconstruc3on
of
exis3ng

intersec3on
for
improved
capacity
and
safety 










3,500,000
 20
Alexandria
 LA Streets/Roads Masonic
Drive
(US
165)
and
Horseshoe
Drive
Intersec3on
Improvements;
reconstruc3on
of
exis3ng

intersec3on
for
improved
capacity
and
safety 










3,500,000
 20
Alexandria
 LA Streets/Roads Culpepper
Road;
Masonic
Drive
to
North
Boulevard‐
reconstruc3on
of
an
exis3ng
20'
asphal3c
concrete
road

with
open
ditches
to
two‐lane
concrete
roadway
with
subsurface
drainage 










6,000,000
 30
Alexandria
 LA Streets/Roads Culpepper
Road;
North
Boulevard
to
MacArthur
Drive;
reconstruc3on
of
an
exis3ng
20'
asphal3c
concrete
road

with
open
ditches
to
two‐lane
concrete
roadway
with
subsurface
drainage 










6,000,000
 30
Alexandria
 LA Streets/Roads Lincoln
Road
Street
and
Drainage
Improvements
‐
reconstruc3on
of
exis3ng
22'
asphal3c
concrete
roadway

with
open
ditches
to
28'
concrete
roadway
with
subsurface
drainage
approximate
length
of
1800
feet;

replacement
of
water,
gas
and
sewer
u3li3es 










2,500,000
 30
Alexandria
 LA Streets/Roads Versailles
Boulevard,
Phase
2,
Package
4
‐
construc3on
of
new
three‐lane
concrete
roadway
with
subsurface

drainage
and
u3li3es
(gas,
water
and
sewer);
approximate
length
of
5300' 










7,014,000
 35
Alexandria
 LA Streets/Roads Horseshoe
Drive;
Masonic
Drive
to
Horseshoe
‐
reconstruc3on
of
exis3ng
two‐lane
asphal3c
concrete
roadway

with
open
ditches
to
three‐lane
concrete
roadway
with
subsurface
drainage 










8,000,000
 50
Alexandria
 LA Transit Acquisi3on
of
property
on
Bolton
Ave.
in
central
Alexandria
for
construc3on
of
new
bus
transfer
sta3on
to

improve
public
transporta3on. 












750,000

Alexandria
 LA Transit Purchase
of
4
new
26
passenger
buses
to
reduce
fuel
cost
and
improve
nighqme
bus
service. 












720,000

Alexandria
 LA Water Water
Well
Addi3ons
and
Rehabilita3ons
‐
the
bulk
of
the
City's
water
wells
were
installed
in
the
late
1960's.


New
wells
need
to
be
drilled
and
exis3ng
wells
need
rehabilita3on
or
replacement.

In
addi3on,
the
City

desperately
needs
more
water
produ 








12,000,000
 12
Alexandria
 LA Water Alexandria
West
Treatment
Plant
‐
construc3on
of
22
MGD
wastewater
plant
to
relieve
exis3ng
treatment
and

faciliate
development
and
growth
in
west
Alexandria. 








67,000,000
 15
Alexandria
 LA Water Hamilton
Street
Pump
Sta3on
‐
2MG
storage
tank
located
at
Hamilton
Street
pump
sta3on
located
at
505

Monroe
Street.

The
exis3ng
pumps
in
this
sta3on
are
60
plus
years
old
surplus
from
Camp
Livingston. 












500,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Alexandria
 LA Water Downtown
Water
Main
Replacement
‐
por3ons
of
our
original
water
system
downtown
date
to
the
late
1800's

or
early
1900's.

A
complete
reconstruc3on
of
the
downtown
water
infrastrucutr
is
needed. 








18,000,000
 22
Alexandria
 LA Water Test
and
Collector
Well
at
Hamilton
Street
‐
2MG
storage
tank
built
in
the
1992
needs
water
wells
to
fill
and

operate
properly. 










1,500,000
 25
Baton
Rouge LA Airport Emergency
Hurricane
Generator,
Airport
Terminal
Building,
4.3
Mega
Wafs





 










4,000,000
 5
Baton
Rouge LA Airport Aircrab
Rescue
Fire
Figh3ng
Vehicle












































 












700,000
 10
Baton
Rouge LA Airport Relocate
Entergy
Power
Line
at
Harding
Boulevard
(Obstruc3on
&
Safety
to
Runway
4L
Approach)






 










3,000,000
 10
Baton
Rouge LA Airport Entergy
Transmission
Tower
Reloca3on
on
Plank
Road
(Obstruc3on
&
Safety
to
the










Runway
22
Approach)


































9,000,000
 20
Baton
Rouge LA Airport Runway
4R/22L
Taxiway
E
&
G
Reconstruc3on























 










8,200,000
 20
Baton
Rouge LA Airport Runway
22R
&
4L
Safety
Area
Perimeter
Road,
405
Study
and
Environmental
Assessment
for
4L/22R



































































































4,660,000
 30
Baton
Rouge LA Airport Aircrab
Rescue
Fire
Figh3ng
Building
Rehabilita3on
and
Expansion














3,000,000
 40
Baton
Rouge LA Airport Complete
Airfield
Drainage
Improvements




























 










5,300,000
 40
Baton
Rouge LA Airport Taxiway
“F”
Reconstruc3on
and
Extension



























 








16,300,000
 50
Baton
Rouge LA CDBG Traffic
Division
Office
Space
Expansion
at
Bon
Carre
Business
Center 












150,000
 2
Baton
Rouge LA CDBG Misdemeanor
Inves3ga3on
Room
Addi3on
and
Hurricane
Damage
Repair 












200,000
 3
Baton
Rouge LA CDBG Mobile
Police
Video
and
Narco3cs
office
space
and
vehicle
work
area 












300,000
 4
Baton
Rouge LA CDBG 4th
District
Police
Sta3on
Replacement 










1,900,000
 15
Baton
Rouge LA CDBG Downtown
Wayfinding
Signage
and
Visitors
Amenity
Plan 










2,000,000
 16
Baton
Rouge LA CDBG Thomas
Delpit
pedestrian
and
street
scape
enhancements
to
service
the
LSB
Community
Center,
YMCA,Polk

Elementary
and
other
public
facili3es 










2,000,000
 16
Baton
Rouge LA CDBG Washington
Street
pedestrian
and
street
scape
enhancements
to
service
the
Butler
Community
Center,
and

City
Park 










2,000,000
 16
Baton
Rouge LA CDBG Government
Street
and
Florida
Street
Enhancements
with
improved
street
lights,
cross
walks
and
other
ADA

compliant
modifica3ons 










2,500,000
 27
Baton
Rouge LA CDBG North
Boulevard
Town
Square
Implementa3on
to
link
civil
and
cultural
assets
including;
Arts
and
Science

Museum,
Old
State
Capitol,
Downtown
Government,
Downtown
Library,
Arts
Center,
Mississippi
River,
etc. 










4,000,000
 31
Baton
Rouge LA CDBG Construct
North
Side
Railroad
Spur
at
Airport
for
North
End
Development
of
Air
Industrial
Park.
The
only

lacking
mode
of
transporta3on
for
the
 








16,400,000
 35
Baton
Rouge LA CDBG Conven3on
Center
Expansion
and
Renova3on 








16,000,000
 125
Baton
Rouge LA CDBG Fire
Sta3on
Replacements
for
Sta3ons:
No.
4,
No.
8,
No.
9,
No.
10,
No.
13,
No.
14,
No.
15,
and
No.
19
and

Renova3ons
to
No.
12
along
with
Training
Tower
Replace 








26,200,000
 205
Baton
Rouge LA CDBG Downtown
Parking
Garage
Replacements
and
Expansion 








69,000,000
 600
Baton
Rouge LA CDBG DeSoto
Park
Development
as
part
of
both
the
Riverfront
Master
Plan
and
Capitol
Park
Master
Plan 








55,000,000
 1000
Baton
Rouge LA CDBG Old
City
Dock
Stabiliza3on
and
Redevelopment 








60,000,000
 1000
Baton
Rouge LA CDBG Baton
Rouge
River
Center
Expansion
 








76,000,000
 2000
Baton
Rouge LA Energy School
zone
crossing
flashers
that
are
LED
and
solar
powered
(160
crossings) 










1,300,000
 5
Baton
Rouge LA Streets/Roads Bridge
Replacement
East
Grant
Street
over
Corpora3on
Canal 












600,000
 6
Baton
Rouge LA Streets/Roads Bridge
Replacement
Sharp
Road
over
Jones
Creek 










1,500,000
 16
Baton
Rouge LA Streets/Roads Pecue
Lane
Re‐alignment
at
Perkins
Rd
(LA
427)‐Capacity
and
safety
improvements
to
re‐align
an
offset

intersec3on
with
turn
lanes
and
new
traffic
signal 










1,500,000
 16
Baton
Rouge LA Streets/Roads Air
Cargo
Building
Access
Road





















































 










8,000,000
 20
Baton
Rouge LA Streets/Roads Major
Arterial
Signal
Inter‐Connect
conversion
of
hard
wire
to
fiber
on
College
Dr,
Sherwood
Forest
Blvd,
and

Highland
Rd,
and
Nicholson
Dr 










2,000,000
 21
Baton
Rouge LA Streets/Roads Bridge
Replacement
Frenchtown
Road
over
Beaver
Bayou 










3,200,000
 34
Baton
Rouge LA Streets/Roads Foster‐Government
Street(LA
73)
Intersec3on
Improvement‐Major
intersec3on
improvements
including
new

turn
lanes
in
all
direc3ons
and
new
signal
system
on
hwy
leading
to
Baton
Rouge
Community
College 










3,500,000
 37
Baton
Rouge LA Streets/Roads North
End
Airport
Industrial
Park
Roads































 








15,000,000
 45
Baton
Rouge LA Streets/Roads Coursey
Boulevard
Pavement
Rehabilita3on
(US
Hwy
61
to
Jones
Creek
Rd) 










5,000,000
 53
Baton
Rouge LA Streets/Roads Perkins
Road(LA
427)
at
Stanford/Acadian
Intersec3on
Improvement‐Major
intersec3on
improvements

including
dual
turn
lanes
in
all
direc3ons
and
new
signal
system
on
hwy
connec3ng
LSU
with
I‐10 










5,000,000
 53
Baton
Rouge LA Streets/Roads Baton
Rouge
Computerized
Signal
Synchroniza3on
Project
Phase
5A 










6,500,000
 69
Baton
Rouge LA Streets/Roads South
Plank
Road
Reloca3on









(Obstruc3on
and
Safety
Runway
31)
















































22,100,000
 70
Baton
Rouge LA Streets/Roads Pavement
Rehabilita3on
and
Replacement
Program
Phase
09/01 








10,000,000
 106
Baton
Rouge LA Streets/Roads Pavement
Rehabilita3on
and
Replacement
Program
Phase
09/02 








10,000,000
 106
Baton
Rouge LA Streets/Roads Central
Thruway
Phase
II‐Provides
new
4‐lane
divided
hwy
that
is
part
of
our
transporta3on
improvement

program
and
provides
needed
flood
evacua3on
route,
including
3
new
bridges
over
Beaver
Bayou
and

intersec3on
improvements
at
state
route
LA
37 








12,300,000
 131
Baton
Rouge LA Streets/Roads Jones
Creek
Road
Improvements
Segment
3‐Capacity
and
safety
improvements
to
upgrade
func3onally

obsolete
2
lane
open
ditch
roadway
to
a
4
lane
divided
curb
and
gufer
hwy,
including
a
bridge
replacement

over
Jones
Creek 








12,300,000
 131
Baton
Rouge LA Streets/Roads Comite
Drive
Improvements‐
Capacity
and
safety
improvements
to
upgrade
func3onally
obsolete
2
lane
open

ditch
roadway
with
a
2
lane
curb
and
gufer
street
with
turn
lanes
and
sidewalks 








14,500,000
 154
Baton
Rouge LA Streets/Roads Baton
Rouge
Computerized
Signal
Synchroniza3on
Project
Future
Phase
Early
Implementa3on

(60

Intersec3ons) 








15,000,000
 160
Baton
Rouge LA Streets/Roads Highland
Road(LA
42)
Improvements‐Capacity
and
safety
improvements
to
upgrade
func3onally
obsolete
2

lane
open
ditch
roadway
to
a
4
lane
divided
hwy,
including
(2)
bridge
replacements
and
improvements
to
an
at

grade
RR
crossing
(KCSRR) 








15,200,000
 162
Baton
Rouge LA Streets/Roads Staring
Lane
Extension‐Capacity
and
connec3vity
with
a
4
lane
divided
curb
and
gufer
hwy
with
sound
walls,

including
a
bridge
over
Bayou
Fountain,
a
66"
sanitary
sewer
upgrade,
and
an
intersec3on
improvement
with

Burbank
Dr
(LA
42) 








16,000,000
 170
City State Program Project
Descrip3on Funding
Required Jobs
Baton
Rouge LA Streets/Roads South
Harrell's
Ferry
Road
Improvements‐Capacity
and
safety
improvements
to
upgrade
func3onally
obsolete

2
lane
open
ditch
roadway
to
a
4
lane
curb
and
gufer
hwy
with
turn
lanes
and
sidewalks,
including
a
bridge

replacement
over
Jones
Creek 








18,000,000
 191
Baton
Rouge LA Streets/Roads Sullivan
Road
Improvements‐
Capacity
and
safety
improvements
to
upgrade
func3onally
obsolete
2
lane
open

ditch
roadway
with
a
4
lane
divided
hwy
and
to
provide
connec3vity
with
adjoining
Parish
and
I‐12 








18,000,000
 191
Baton
Rouge LA Streets/Roads Central
Thruway
Phase
I‐Provides
new
4‐lane
divided
hwy
that
is
part
of
our
transporta3on
improvement

program
and
provides
needed
flood
evacua3on
route,
including
RR
overpass
and
intersec3on
improvements
at

US
Hwy
190 








18,300,000
 195
Baton
Rouge LA Transit GPS
Equipment
and
Tracking
system
for
en3re
Transit
Authority
Fleet 












400,000
 3
Baton
Rouge LA Transit Construct
new
Downtown
Intermodal
Transit
Shelter 










1,000,000
 10
Baton
Rouge LA Transit Dynamic
message
signs
for
traveler
informa3on
and
assistance 










3,000,000
 12
Baton
Rouge LA Water North
Waste
Water
Treatment
Plant
Odor
Control
and
Liquid
Phase
Implementa3on 










4,000,000
 16
Baton
Rouge LA Water Aster
Chimes
Drainage
Impovements
Phase
II
(LSU
to
W.
Roosevelt) 










1,500,000
 23
Baton
Rouge LA Water Lovef
Road
Area
Mul3ple
Sanitary
Sewer
Pump
Sta3on
Upgrades
which
are
part
of
our
SSO
elimina3on

program 










3,600,000
 29
Baton
Rouge LA Water Parish
Wide
Sanitary
Sewer
Physical
Inspec3on,
CCTV,

and
Cleaning.

This
is
a
one
year
contract
with
the

op3on
to
renew
2
addi3onal
yrs
with
the
contract
value
set
at
$2
million
per
year 










4,000,000
 33
Baton
Rouge LA Water Northwest
Airport
Box
Culvert






to
Allow
for
Development
(Monte
Sano
Bayou)






















10,000,000
 35
Baton
Rouge LA Water West
Side
Box
Culvert
to
Increase
Airport
Public
Parking


































































 








11,000,000
 40
Baton
Rouge LA Water Oak
Villa
Blvd‐Choctaw

Area
Sanitary
Sewer
Comprehensive
Rehabilita3on
which
is
part
of
our
SSO

elimina3on
program 










6,000,000
 49
Baton
Rouge LA Water Staring
Lane‐Boone
Dr
Area
Sanitary
Sewer
Comprehensive
Rehabilita3on
which
is
part
of
our
SSO
elimina3on

program 










6,000,000
 49
Baton
Rouge LA Water Foster‐Hooper
Road
Area
Sanitary
Sewer
Upgrades
which
is
part
of
our
SSO
elimina3on
program 










8,500,000
 69
Baton
Rouge LA Water Pump
Sta3on
136
Area

Sanitary
Sewer
Upgrades
which
is
part
of
our
SSO
elimina3on
program 










8,500,000
 69
Baton
Rouge LA Water Burbank
Rd‐Gardere
Lane
Area
Sanitary
Sewer
Comprehensive
Rehabilita3on
which
is
part
of
our
SSO

elimina3on
program 










9,000,000
 73
Baton
Rouge LA Water Scotland
Ave‐Progress
Rd
Area
Sanitary
Sewer
Comprehensive
Rehabilita3on
which
is
part
of
our
SSO

elimina3on
program 










9,000,000
 73
Baton
Rouge LA Water Industriplex
Area
Sanitary
Sewer
Facility
Upgrades
which
is
part
of
our
SSO
elimina3on
program 








10,200,000
 83
Baton
Rouge LA Water South
Waste
Water
Treatment
Plant
Dry
Weather
Flow
Immediate
Ac3on
Improvements‐Trickling
Filter,
re‐
circula3on
pump
sta3on,
and
sludge
handling
improvements 








42,000,000
 341
Bossier
City LA CDBG Scof
Street

Area
Sewer
Rehab 










2,000,000
 25
Bossier
City LA CDBG Barksdale
Annex
Street
Rehab 










1,500,000
 100
Bossier
City LA CDBG Downtown
Bossier
Drainage
Improvements 










1,500,000
 100
Bossier
City LA CDBG Downtown
Bossier
Street
Rehab 










1,500,000
 100
Bossier
City LA CDBG Mitchell
Park
Rehab 










2,100,000
 100
Bossier
City LA CDBG Sidewalk
Rehab 










1,500,000
 100
Bossier
City LA Streets/Roads ART‐
Traffic
Street
Widening 










9,000,000
 150
Bossier
City LA Streets/Roads Airline
Drive
Railroad
Underpass 








18,500,000
 200
Bossier
City LA Streets/Roads ART
‐
South 








10,000,000
 200
Bossier
City LA Streets/Roads Swan
Lake
Road 










9,500,000
 200
Bossier
City LA Water Red
River
Treatment
Plant
Rehab 










1,000,000
 25
Bossier
City LA Water Sewer
Rehab 










2,000,000
 25
Bossier
City LA Water Lab
Building
&
Rehab 










1,000,000
 50
Bossier
City LA Water Drainage
Rehab 










1,000,000
 100
Bossier
City LA Water Bossier
City
Sewer
Treatment
Facility 








50,000,000
 500
Bossier
City LA Water Bossier
City
Water
Purifica3on
Facility 








80,000,000
 500
Monroe LA Airport Regional
Airport
Terminal 








31,000,000

Monroe LA Housing Unsafe
Structures
Program 










1,500,000

Monroe LA Housing Reroof
city
buildings 










1,500,000
 10
Monroe LA Housing clearance
and
demoli3on
of
300
unsafe
structures 










1,150,000
 100
Monroe LA Public
Safety Biological
Radioac3ve
Nuclear
Explosive
Incident
Response
Vehicle 












275,000

Monroe LA Public
Safety Chemical
Biological
Radioac3ve
Nuclear
Explosive
Incident
Response
Vehicle 












260,413
 0
Monroe LA Public
Safety rennovate
two
fire
sta3ons 










4,500,000
 25
Monroe LA Streets/Roads Air
Industrial
Park
Rail
Spur

Air
Industrial
Park
Service
Roads 










6,150,000

Monroe LA Streets/Roads Downtown
Parking 










1,750,000

Monroe LA Streets/Roads Evangeline
Street
Drainage 










1,412,000

Monroe LA Streets/Roads Forsythe
Extension
Corridor
Preserva3on 










1,800,000

Monroe LA Streets/Roads I‐20
Frontage
Road
at
Millhaven 










2,500,000

Monroe LA Streets/Roads Tower
Armand
Right‐of‐way 










2,100,000

Monroe LA Transit bike
trails 












175,000
 5
Monroe LA Water Relocate
Sewage
Lib
Sta3on,
Garref
Road 














90,000

Monroe LA Water Remote
Water
Booster
Sta3ons 










2,140,000

Monroe LA Water Water
Main
Loop
on
Hadley
Street 










1,511,000

New
Iberia LA CDBG Housing
Handicap
Accessibility
Improvements 












500,000
 10
New
Iberia LA CDBG St.
Mary
St.
Sewer
Rehab 












465,000
 12
New
Iberia LA CDBG Basin
B
Wastewater
Collec3ons 












965,000
 15
New
Iberia LA CDBG Field
&
Dale
St.
Sewer
Rehab 












645,000
 15
New
Iberia LA CDBG Santa
Ines
Wastewater
Project 












700,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
New
Iberia LA CDBG Municipal
Street
Improvements 










2,006,000
 20
New
Iberia LA CDBG Hopkins
Street
Improvements 










1,000,000
 25
New
Iberia LA CDBG Sewer
Rerou3ng
Project 










2,100,000
 25
New
Iberia LA CDBG Mul3‐use
Conference
Center 








23,000,000
 75
New
Orleans LA Airport U3li3es
Phase
of
Concourse
D
Expansion
‐
New
HVAC
system
to
provide
addi3onal
capacity
for
increased
floor

space 










2,500,000
 61
New
Orleans LA Airport New
Airfield
Vault
‐
replace
exis3ng
electrical
switchgear
vault
for
airfield 










3,500,000
 87
New
Orleans LA Airport Concourse
D
Apron
‐
reloca3on
of
taxilanes
to
accomodate
addi3onal
carrier
traffic 










5,000,000
 121
New
Orleans LA Airport Aberdeen
Street
Improvements
‐
upgrade
of
exis3ng
general
avia3on
access
road 










6,000,000
 149
New
Orleans LA Airport West
Terminal
Roadway
‐
realignment
of
terminal
traffic
connec3ng
new
passenger
facili3es 










8,500,000
 211
New
Orleans LA Airport West
Terminal
Apron
‐
Expansion
Airfield
Apron
to
support
aircrab
opera3ons 








10,000,000
 242
New
Orleans LA Airport Facility
Improvement
Program
‐
upgrades
and
renova3on
of
the
Airport
facili3es 








10,520,150
 261
New
Orleans LA Airport Taxiway
Golf
East
Extension
‐
extend
exis3ng
taxiway
to
connect
with
north/south
runway 








10,601,755
 263
New
Orleans LA Airport U3lity
Building
‐
Permanent
storm‐proof
facility
for
backup
power 








11,000,000
 273
New
Orleans LA Airport New
Aircrab
Rescue
and
Fire
Figh3ng
(ARFF)
Sta3on
‐
construc3on
of
new
emergency
response
facility 








12,000,000
 298
New
Orleans LA Airport Terminal
Apron
Rehabilita3on
‐
Phases
I
&
II
‐
restore
air
carrier
apron
surrounding
terminal
and
concourses 








16,536,287
 410
New
Orleans LA Airport West
Annex
Gates
and
Terminal
Expansion
‐
constrc3on
of
6
new
gates
to
replaced
aging
facility 








34,000,000
 844
New
Orleans LA Airport West
Terminal
Expansion
‐
Expansion
of
passenger
facili3es
including
addi3onal
gates
and
ameni3es 








34,000,000
 844
New
Orleans LA Airport Expansion
of
Concourse
D
‐
6
addi3onal
gates
and
reconfigura3on
of
taxiway 








42,451,830
 1053
New
Orleans LA Amtrak Acquisi3on
and
Retrofit
of
Greyhound
Baggage
Express/Dormitory
Building
for
City/Homeland
Security

Emergency
Center 










3,400,000

New
Orleans LA Amtrak Union
Passenger
Terminal
Asbestos
Abatement/ADA
Improvements
and
Upgrades 










1,050,000

New
Orleans LA Amtrak Union
Passenger
Terminal
New
Central
Plant 










4,120,000

New
Orleans LA Amtrak Union
Passenger
Terminal
New
Commissary
Building
for
AMTRAK 










1,500,000

New
Orleans LA Streets/Roads Earhart
Boulevard
(Hamilton
to
Fern) 










7,500,000

New
Orleans LA Streets/Roads Fleur
D'
Lis
Phase
2 










9,000,000

New
Orleans LA Streets/Roads Lakefront/Holy
Cross
Signals 










3,000,000

New
Orleans LA Streets/Roads Robert
E.
Lee
(Praf
to
Paris) 










3,000,000

New
Orleans LA Streets/Roads Robert
E.
Lee
Bridge
at
London
Avenue 










6,000,000

New
Orleans LA Streets/Roads St.
Charles
Avenue
(Calliope
to
Napoleon) 










5,000,000

New
Orleans LA Streets/Roads Woodland
(DeGaulle
to
Tullis) 










5,500,000

New
Orleans LA Transit 10
Ton
Port‐A‐Power
Machine 


















800

New
Orleans LA Transit 100
Veloway
Bike
Program
bikes 










2,500,000

New
Orleans LA Transit 25HP
NorthStar
2Gun
Hot
Water
Pressure
Washer
Trailer 














11,000

New
Orleans LA Transit 30
E‐Z
buses 










2,445,000

New
Orleans LA Transit 350
Transit
Shelters 










2,800,000

New
Orleans LA Transit 9
transit
Police
Replacement
Vehicles 












279,000

New
Orleans LA Transit ADA
Voice
Annunciator
Equipment 












680,000

New
Orleans LA Transit Auto‐Cad
Control
System
for
Plasma
Cufer 














75,000

New
Orleans LA Transit BRT
buses
‐
10
ar3culated 










7,500,000

New
Orleans LA Transit Charging
System
Test
Equipment 















2,500

New
Orleans LA Transit Diagnos3c
computer
system
and
sobware 














24,800

New
Orleans LA Transit Diesel
Injector
Cleaner 















2,200

New
Orleans LA Transit Disc
Drum
Lathe
and
Equipment 














10,500

New
Orleans LA Transit EGR
Cleaner
for
6.0
Engine 















2,500

New
Orleans LA Transit Electronic
front
end
alignment
machine 














55,000

New
Orleans LA Transit Engine
and
Transporta3on
Training
Module
for
Cummins
ISL 














45,000

New
Orleans LA Transit Engine
Flush
Machine
and
Afachments 














15,000

New
Orleans LA Transit Ford
IDS
System 














10,400

New
Orleans LA Transit Four
Post
Computer
Alignment
Machine 














40,000

New
Orleans LA Transit Gas
Forge 














20,000

New
Orleans LA Transit Gas
Injector
Cleaner 















1,500

New
Orleans LA Transit Hotwash
cleaning
sta3on 














20,000

New
Orleans LA Transit HVAC
Flush
System 















1,800

New
Orleans LA Transit Landall
Truck
and
Trailer 












160,000

New
Orleans LA Transit Miscellaneous
Transit
Maintenance
Equipment 












577,098

New
Orleans LA Transit Nitrogen
infla3on
system 














30,000

New
Orleans LA Transit Paint
Shaker 















2,000

New
Orleans LA Transit Paratransit
Mobile
Date
Terminal
(MDT) 












200,000

New
Orleans LA Transit Preven3ve
Maintenance
‐
fuel,
parts,
etc. 








10,000,000

New
Orleans LA Transit Push
Motor
and
Afachments 














62,798

New
Orleans LA Transit Simmons
Wheel
Borer,
41"
table
with
5
1/2"
to
6"
wheel
bore 












490,000

New
Orleans LA Transit Spot
welder
and
Heavy
duty
Brake
Press 












250,000

New
Orleans LA Transit Street
Repair
at
Eastern
New
Orleans
Facility 










1,500,000

New
Orleans LA Transit Swing
Beam
Shear 














90,000

New
Orleans LA Transit Thermo
King
Self
Contained
Module 














26,000

New
Orleans LA Transit Transmission
Flush
Machine 















6,300

New
Orleans LA Transit Transmission
Flush
Machine
and
Afachments 














12,000

New
Orleans LA Transit Upgrade
ITS
‐
Wireless
and
"Blue
Cloud" 












151,348

New
Orleans LA Transit Wheel
Borer
Equipment 












490,000

City State Program Project
Descrip3on Funding
Required Jobs
New
Orleans LA Water Gen.
DeGaulle
Pump
Sta3on
Retrofit 












510,000
 2
New
Orleans LA Water Filter
Rehabilita3on
‐
replacement,
cleaning
and
maintenance
for
four
to
six
filters 










3,000,000
 18
New
Orleans LA Water Sodium
Hypochlorite
Storage
and
Feed
Facility
‐
drinking
water
purifica3on 










3,300,000
 18
New
Orleans LA Water Co‐Genera3on
of
Electricity
‐
design/build
one
1,000
gross/950
net
KW
organic
Rankine
cycle
turbine
and

ancillary
equipment 










4,990,000
 26
New
Orleans LA Water New
Sludge
Line
to
the
River
‐
provide
separate,
redundant
discharge
line
to
the
Mississippi
River 










6,200,000
 36
Shreveport LA Airport Regional
Airport
Overlay
Exis3ng
Streets
and
Add
Addi3onal
Street
Ligh3ng 










1,000,000
 10
Shreveport LA Airport 20
Addi3onal
T‐Hangars 










1,500,000
 15
Shreveport LA Airport Airfield
Perimeter
Road
at
Downtown
Airport 










3,000,000
 30
Shreveport LA Airport Water
and
Sewerage
Systems
for
Downtown
Airport 










3,500,000
 35
Shreveport LA Airport Addi3onal
Aircrab
Parking
Apron
Southeast
Quadrant 










5,000,000
 50
Shreveport LA Airport Airfield
Perimeter
Road
at
Regional
Airport 










5,000,000
 50
Shreveport LA Airport Fiber
Op3cs
for
Regional
and
Downtown
Airports 










5,000,000
 50
Shreveport LA Airport Design
and
Construc3on
of
the
Infrastructure
for
West
Cargo
Area,
Including
Streets
and
U3li3es 










6,000,000
 60
Shreveport LA Airport Hollywood
Avenue
Reconstruc3on
for
Access
to
the
New
Cargo
Area 










6,000,000
 60
Shreveport LA Airport Alterna3ve
Energy
Sources
for
Regional
and
Downtown
Airports 








10,000,000
 100
Shreveport LA Airport Auxiliary
Runway
Southeast
Quadrant 








10,000,000
 100
Shreveport LA Airport Energy
Efficient
Upgrades
for
Regional
and
Downtown
Airports 








10,000,000
 100
Shreveport LA Airport Reloca3on
of
Air
Traffic
Control
Tower
at
Regional
Airport 








10,000,000
 100
Shreveport LA Airport Environmental
Upgrades

for
Regional
and
Downtown
Airports
 








15,000,000
 150
Shreveport LA Airport Reloca3on
of
RAPCON
from
Barksdale
Air
Force
Base
to
Regional
Airport 








15,000,000
 150
Shreveport LA Airport Regional
Airport
Runway
Extension
to
10,000
feet,
to
Include
tunneling
under
70th
Street
and
the
Railroad 








50,000,000
 500
Shreveport LA Amtrak Marshall,
Texas
to
Shreveport,
LA
 








90,000,000
 900
Shreveport LA CDBG A.C.
Steere
Restrooms
to
serve
ADA‐accessible
park 












200,000
 2
Shreveport LA CDBG Demoli3on
of
Unsafe
Housing
in
CDBG‐eligible
areas 












500,000
 5
Shreveport LA CDBG Neighborhood
Business
Service
Center 












500,000
 5
Shreveport LA CDBG Business
and
Arts
Historic
Project 












800,000
 8
Shreveport LA CDBG Concordia
Place
Infrastructure
improvements 












950,000
 10
Shreveport LA CDBG The
Oakland
Street
Historic
Preserva3on
Project 










1,000,000
 10
Shreveport LA CDBG Jewell
Outreach
Center
No.
2
(transi3onal
housing
facility) 










1,200,000
 12
Shreveport LA CDBG The
Film
Training
Center 










1,500,000
 15
Shreveport LA CDBG The
Shreveport
Manchester
Bidwell
Entrepreneurial
Workforce
Training
Center 










1,800,000
 18
Shreveport LA CDBG George
P.
Hendrix
Mul3‐Purpose
Center,
conversion
of
school
building 










2,000,000
 20
Shreveport LA CDBG Business
Development
Revolving
Loan
Fund 










3,000,000
 30
Shreveport LA CDBG Cargill
Sports
Complex,
renovate
regional
outdoor
sports
complex
for
sobball,
baseball,
and
soccer,
including

ADA‐compliant
renova3ons 










5,000,000
 50
Shreveport LA CDBG Golf
Course
Renova3ons,
including
greens,
tees,
paths,
ligh3ng,
drainage,
irriga3on,
landscaping,
and
ADA‐
Compliant
renova3ons 










5,000,000
 50
Shreveport LA CDBG Paul
Lynch
Park
Development,
infrastructure,
drives,
parking,
athle3c
facili3es,
and
playground
development 










5,000,000
 50
Shreveport LA CDBG Renova3ons
to
Fairgrounds
Field,
including
ligh3ng,
family‐area
improvements,
and
improvements
to

concession
stands,
sea3ng,
and
ADA‐compliant
improvements 










5,000,000
 50
Shreveport LA CDBG Construct
Three
Aqua3cs
Facili3es
in
CDBG‐eligible
neighborhoods,
including
Olympic
pool,
waterslide,
water

playground,
bathhouse,
and
other
site
improvements 










6,000,000
 60
Shreveport LA CDBG Riverview
Facility
Renova3ons,
including
energy
upgrades,
ADA‐compliant
improvements 










6,000,000
 60
Shreveport LA CDBG Therapeu3c
Recrea3on
Center
Development,
including
indoor
therapeu3c
pool 










6,000,000
 60
Shreveport LA CDBG Neighborhood
Park
Improvements,
includes
path
overlays,
tree
plan3ng,
and
other
outdoor
recrea3on 










7,000,000
 70
Shreveport LA CDBG Community
Center
Development,
build
two
new
community
centers
in
CDBG‐eligible
neighborhoods 








10,000,000
 100
Shreveport LA Energy Air
Quality
Modeling
Program 












500,000
 5
Shreveport LA Energy Sprague
Street
Streetscape,
pedestrian
walkways,
ligh3ng,
landscaping 












600,000
 6
Shreveport LA Energy Barnwell
Center
Conservatory,
renovate
conservatory,
use
for
green
educa3on,
retrofit
with
energy‐efficient

systems
and
controls,
ADA
upgrades 










2,000,000
 20
Shreveport LA Energy Municipal
Auditorium,
including
energy‐efficient
ligh3ng,
HVAC
system
upgrade,
elevator
retrofit,
ADA

compliant 










2,500,000
 25
Shreveport LA Energy Police
Facility,
energy,
conserva3on
upgrades,
including
HVAC,
bathroom
retrofit
for
water
conserva3on,
and

winddow
replacement 










3,000,000
 30
Shreveport LA Energy Open
Space
Acquisi3on,
purchase
property
to
preserve
green
space
in
our
community 










4,000,000
 40
Shreveport LA Energy Clyde
Fant
Parkway
Recrea3on
Area
Improvement,
including
greenway
improvement,
tree
plan3ng,
and

infrastructure
upgrades 










5,000,000
 50
Shreveport LA Energy Emerging
Technologies
Demonstra3on
and
Educa3on
Projects
in
public
facili3es,
including
solar
panels,
storm

water
rain
gardens,
and
green
roofs 










5,000,000
 50
Shreveport LA Energy Louisiana
State
Fairgrounds
energy
upgrades
including
ligh3ng,
HVAC,
tree
plan3ng,
and
landscaping 










6,000,000
 60
Shreveport LA Energy Mul3‐Modal
Transporta3on
Improvements,
crea3ng
alterna3ve
automobile
transporta3on,
bike,
and

pedestrian
facili3es,
transit
connec3ons,
and
public
informa3on 










6,500,000
 65
Shreveport LA Public
Safety Fire
Sta3on
No.
11
‐
kitchen
expansion,
interior
cosme3c
repairs,
and
engine
room
floor
drain 












125,000
 1
Shreveport LA Public
Safety Fire
Sta3on
No.
12
‐
kitchen,
dayroom,
updated
floors,
interior
cosme3c
repairs,
roof
and
fence 














60,000
 1
Shreveport LA Public
Safety Fire
Sta3on
No.
13
‐
finish
Bafalion
Chief's
bedroom
and
add
full‐size
doors 














65,000
 1
Shreveport LA Public
Safety Fire
Sta3on
No.
18
‐
kitchen,
dayroom,
floors,
and
bathrooms
updated 














40,000
 1
Shreveport LA Public
Safety Fire
Sta3on
No.
20
‐
interior
repairs
and
fence 














30,000
 1
Shreveport LA Public
Safety Fire
Sta3on
No.
22
‐
back
driveway,
bedding,
landscaping,
and
fence 












100,000
 1
Shreveport LA Public
Safety Fire
Sta3on
No.
5
‐
interior
renova3on
(extra
bathroom)
officers 














45,000
 1
Shreveport LA Public
Safety Fire
Sta3on
No.
6
‐
interior
renova3on
(kitchen,
dayroom,
bathrooms
updated),
and
floors 














40,000
 1
Shreveport LA Public
Safety Fire
Sta3on
No.
7
‐
kitchen,
dayroom
updated,
and
floors 














40,000
 1
City State Program Project
Descrip3on Funding
Required Jobs
Shreveport LA Public
Safety Fire
Sta3on
No.
8
‐
slab
repair
in
truck
bay,
water
proofing
and
cosme3c
interior
repairs 














40,000
 1
Shreveport LA Public
Safety Fuming
Chamber
for
Crime
Scene
Inves3ga3on
Processing 














25,000
 1
Shreveport LA Public
Safety License
Plate
Reader
(2) 














35,000
 1
Shreveport LA Public
Safety Mobile
Processing
Van
for
Crime
Scene 














50,000
 1
Shreveport LA Public
Safety One
(1)
Ford
Fuel
Truck 














40,000
 1
Shreveport LA Public
Safety Path
Overlay
at
Fire
and
Police
Academy 














80,000
 1
Shreveport LA Public
Safety Purchase
of
8
Police‐Equipped
Harley‐Davidsons 












150,000
 1
Shreveport LA Public
Safety Equipment
for
Special
Response
Team
(SRT) 












200,000
 2
Shreveport LA Public
Safety Fire
Sta3on
No.
10
‐
exterior
preserva3on,
roof,
and
interior
cosme3c
repairs 












250,000
 2
Shreveport LA Public
Safety Fire
Sta3on
No.
4
‐
interior
renova3on
(move
all
bedrooms
upstairs) 












175,000
 2
Shreveport LA Public
Safety Patrol
Rifles
(200) 












250,000
 2
Shreveport LA Public
Safety Seven
(7)
fire‐equipped
Chevrolet
Suburban
Vehicles 












420,000
 2
Shreveport LA Public
Safety Special
Response
Team
(SRT)
Armored
Vehicle 












250,000
 2
Shreveport LA Public
Safety Twelve
(12)
Ford
Expedi3ons
Vehicles 












288,000
 2
Shreveport LA Public
Safety Fire
Maintenance
Facility,
parking
apron,
generator,
test
pit
cover,
parking
lot,
and
fuel
island
for
new
shop 












300,000
 3
Shreveport LA Public
Safety Purchase
of
8
Police‐Equipped
Chevy
Tahoes 












384,000
 3
Shreveport LA Public
Safety Replacement
of
Elevators
at
James
C.
Gardner
Police
Building 












300,000
 3
Shreveport LA Public
Safety Two
(2)
new
medic
units 












530,000
 3
Shreveport LA Public
Safety Four
(4)
refurbished
medic
units 












740,000
 4
Shreveport LA Public
Safety One
(1)
ladder
truck 












965,000
 5
Shreveport LA Public
Safety West
Net
First
Aler3ng
System
in
19
Fire
Sta3ons 












600,000
 6
Shreveport LA Public
Safety Fire
Sta3on
No.
16
‐
extensive
interior
remodeling,
dayroom,
kitchen,
bathrooms,
and
bedrooms,
roof 












750,000
 7
Shreveport LA Public
Safety Fire
Sta3on
No.
19
‐
kitchen,
dayroom,
floors,
bathrooms
updated,
office
renova3ons,
fence
and
bedroom

configura3on 












750,000
 7
Shreveport LA Public
Safety Fire
Sta3on
No.
9
‐
new
bedroom
wing
on
north
side,
roof
and
interior
cosme3c
repairs 












850,000
 8
Shreveport LA Public
Safety Fire
Sta3on
No.3,
expansion
to
east
side
(day
room,
kitchen,
and
captain's
office)
already
designed 












850,000
 8
Shreveport LA Public
Safety Replacement
of
Payroll
System 










1,750,000
 8
Shreveport LA Public
Safety Install
Surveillance
Cameras
System
City‐Wide
with
Shot‐Spofer
Technology 










3,000,000
 10
Shreveport LA Public
Safety Replacement
of
Accoun3ng
and
Purchasing
System 










2,000,000
 10
Shreveport LA Public
Safety Replacement
of
Water
Billing
System 










2,000,000
 10
Shreveport LA Public
Safety Purchase
of
25
Police‐Equipped
Dodge
Chargers 










1,100,000
 11
Shreveport LA Public
Safety New
Mobile
Command
Vehicle 










1,300,000
 13
Shreveport LA Public
Safety Parking
Facility
at
James
C.
Gardner
Police
Headquarters 










2,000,000
 20
Shreveport LA Public
Safety Renova3on
at
City
Jail 










2,000,000
 20
Shreveport LA Public
Safety Ten
(10)
new
fire
trucks 










4,650,000
 20
Shreveport LA Public
Safety Construc3on
of
Student
Parking
at
Fire
and
Police
Academy 










2,400,000
 24
Shreveport LA Public
Safety Fire
Sta3on
No.
1‐
Two
extra
engine‐room
bays
and
15

extra
bedrooms
per
original
design 










2,700,000
 27
Shreveport LA Public
Safety Fire
Sta3on
No.
14
‐
reloca3on
to
fit
master
plan 










2,900,000
 29
Shreveport LA Public
Safety Fire
Sta3on
No.
15
‐
reloca3on
to
fit
master
plan 










2,900,000
 29
Shreveport LA Public
Safety Fire
Sta3on
No.
17
‐
reloca3on
to
fit
master
plan 










2,900,000
 29
Shreveport LA Public
Safety Fire
Sta3on
No.
2
‐
reloca3on
to
fit
master
plan 










2,900,000
 29
Shreveport LA Public
Safety Fire
Sta3on
No.
23
‐
new
sta3on
to
meet
master
plan 










2,900,000
 29
Shreveport LA Public
Safety Purchase
of
80
Police‐Equipped
Ford
Crown
Victorias 










3,600,000
 36
Shreveport LA Public
Safety Rebuild
and
Upgrade
Cross
Lake
Patrol
Facility 










4,000,000
 40
Shreveport LA Public
Safety Renova3on
of
Fire
and
Police
Academy 










4,000,000
 40
Shreveport LA Public
Safety Construc3on
of
Evidence
Property
Building
with
Secure
Fence
Facility 










5,000,000
 50
Shreveport LA Public
Safety James
C.
Gardner
Police
Facility
Upgrades,
includes
upgrades
to
meet
ADA
compliance,
covered
parking
for

emergency
response
vehicles,
and
Crime‐Scene
Inves3ga3on
Laboratory 










5,000,000
 50
Shreveport LA Public
Safety New
Office
and
Storage
Facility
for
Downtown
Mounted
Patrol
Facility 










5,000,000
 50
Shreveport LA Public
Safety COPS
Hiring
Grant
for
90
Addi3onal
Police
Officers
‐
includes
cars,
equipment,
training,
and
first
year
salary 










7,200,000
 90
Shreveport LA Public
Safety Emergency
Vehicle
Opera3on
Center 








10,000,000
 100
Shreveport LA Public
Safety Construct
Outdoor
Pistol
and
Rifle
Range
to
Include
Live‐Fire
Training 








12,000,000
 120
Shreveport LA Public
Safety Construc3on
of
700
MHZ
Interoperable
Communica3ons
System
for
Public
Safety/Homeland
Security 








20,000,000
 200
Shreveport LA Public
Safety Contruc3on
of
Cyber
Opera3ons
Security
Ins3tute
at
Louisiana
State
University
in
Shreveport
(LSUS‐COSI) 








40,000,000
 400
Shreveport LA Public
Safety Permanent
Mass‐Evacua3on
Shelter 








50,000,000
 500
Shreveport LA Public
Safety Construct
Regional
Emergency
Opera3ons
Center,
may
also
serve
as
Backup
EOC
for
State
of
Louisiana 






100,000,000
 1000
Shreveport LA Streets/Roads 100
Block
Oakridge
Drainage
Shreveport LA Streets/Roads Ravendale
@
Old
Mooringsport
Road
Intersec3on 












850,000
 8
Shreveport LA Streets/Roads Box
Culvert/ditch
along
Bert
Kouns
@
Town
South
Apartments 










1,200,000
 12
Shreveport LA Streets/Roads Hollywood
Avenue
at
Mansfield
Road
Intersec3on 










1,200,000
 12
Shreveport LA Streets/Roads Red
Stone
Ditch
Paving 










1,200,000
 12
Shreveport LA Streets/Roads Fernwood
‐
Valley
View
Ditch
Paving 










1,350,000
 13
Shreveport LA Streets/Roads Green
Terrace
Ditch
Paving 










1,300,000
 13
Shreveport LA Streets/Roads McAdoo
Street,
Coronado,
Birch,
and
Normandie
Drive
Drainage
Improvements 










1,300,000
 13
Shreveport LA Streets/Roads Line
Avenue
@
Ockley
Drive
Intersec3on 










1,500,000
 15
Shreveport LA Streets/Roads Aiport
Ditch
Repairs
(Wyngate
Drive) 










1,600,000
 16
Shreveport LA Streets/Roads Gilbert
Bayou
Overflow
Bridge
west
of
Dean
Road 










1,600,000
 16
Shreveport LA Streets/Roads Summer
Grove
Ditch
Repairs 










1,600,000
 16
Shreveport LA Streets/Roads Valleyview
Bridge
Improvements
at
Airport
Ditch 










1,750,000
 17
Shreveport LA Streets/Roads Gilbert
Lateral
Ditch
Paving 










1,800,000
 18
City State Program Project
Descrip3on Funding
Required Jobs
Shreveport LA Streets/Roads Pierremont
Park
Ditch/Gilbert
Lateral 










1,800,000
 18
Shreveport LA Streets/Roads Williamson
Way
Extension 










1,800,000
 18
Shreveport LA Streets/Roads Audrey
Lane
Ditch
Paving
(2800
block
of
Freddie
to
end) 










2,000,000
 20
Shreveport LA Streets/Roads I‐20
Entrance/Exit
to
State
Fairgrounds 










2,000,000
 20
Shreveport LA Streets/Roads Jewella
Avenue
Bridge
Improvements
at
Airport
Ditch 










2,000,000
 20
Shreveport LA Streets/Roads Kings
Highway
at
Hearne
Avenue
Intersec3on 










2,000,000
 20
Shreveport LA Streets/Roads MLK
Ditch
Paving
(Linear
St.
upstream
to
exis3ng
paved
sec3on) 










2,000,000
 20
Shreveport LA Streets/Roads Purchase
of
Flood‐prone
Proper3es 










2,000,000
 20
Shreveport LA Streets/Roads Cherokee
Park
Ditch
Improvements 










2,100,000
 21
Shreveport LA Streets/Roads Jones‐Mabry
Lateral
Paving 










2,200,000
 22
Shreveport LA Streets/Roads KCS
Railroad
Overpasses 










2,500,000
 25
Shreveport LA Streets/Roads Murphy
Street
Viaduct
Replacement 










2,500,000
 25
Shreveport LA Streets/Roads Repair
and
upgrade
of
fencing
and
sound
barriers
on
I‐20
and
I‐49 










2,500,000
 25
Shreveport LA Streets/Roads South
Lakeshore
Drive
Bridge
Replacement 










2,500,000
 25
Shreveport LA Streets/Roads Buncombe
Road
Widening 










2,800,000
 28
Shreveport LA Streets/Roads Fant
Parkway
Bridge
@
Island
Park 










3,000,000
 30
Shreveport LA Streets/Roads Hearne
Avenue
at
Midway
Flood
Improvements 










3,000,000
 30
Shreveport LA Streets/Roads Repair
and
reconstruc3on
of
State
Fairgrounds
surface
lots
and
streets 










3,100,000
 31
Shreveport LA Streets/Roads Cur3s
Lane
Widening 










3,200,000
 32
Shreveport LA Streets/Roads Union
Pacific
Overpass
at
Shreve
Park
Industrial
Campus 










3,500,000
 35
Shreveport LA Streets/Roads East
Southfield
Extension 










3,900,000
 39
Shreveport LA Streets/Roads Kingston
Road
Widening 










4,000,000
 40
Shreveport LA Streets/Roads Brush
Bayou
Clearing
and
Dredging 










4,500,000
 45
Shreveport LA Streets/Roads Knight
Street
Improvements 










4,500,000
 45
Shreveport LA Streets/Roads Flournoy
Lucas
Road
Widening 










5,500,000
 55
Shreveport LA Streets/Roads MLK
Ditch
Paving
(Jones‐Mabry
to
north
of
Willis) 










6,000,000
 60
Shreveport LA Streets/Roads Norris
Ferry/Harts
Island
Road
Study
Projects 










6,000,000
 60
Shreveport LA Streets/Roads Russell
Road
Widening
and
Flood
Improvements
with
Entrance
to
North
Regional 










6,000,000
 60
Shreveport LA Streets/Roads Pines
Road
Widening 










7,800,000
 78
Shreveport LA Streets/Roads Railroad
Crossings 










8,000,000
 80
Shreveport LA Streets/Roads Street
Ligh3ng
Improvements 










8,000,000
 80
Shreveport LA Streets/Roads Bickham
Bayou
Paving 










8,400,000
 84
Shreveport LA Streets/Roads Ellerbe
Road
Widening 










8,400,000
 84
Shreveport LA Streets/Roads Extension
of
LA
526
(Industrial
Loop) 










8,800,000
 88
Shreveport LA Streets/Roads Drainage
Ditch
Repair 










9,000,000
 90
Shreveport LA Streets/Roads Kings
Highway
Corridor
Improvements 










9,000,000
 90
Shreveport LA Streets/Roads City‐Wide
Resurfacing 








10,000,000
 100
Shreveport LA Streets/Roads Roy
Road
Widening 








11,500,000
 115
Shreveport LA Streets/Roads City‐Wide
Drainage
Improvements 








12,000,000
 120
Shreveport LA Streets/Roads Linwood
Avenue
Widening 








12,000,000
 120
Shreveport LA Streets/Roads Stoner
Avenue
Overpass 








12,000,000
 120
Shreveport LA Streets/Roads Brush
Bayou
Paving 








15,000,000
 150
Shreveport LA Streets/Roads Linwood
Avenue
Overpass 








15,600,000
 156
Shreveport LA Streets/Roads Hilry
Huckaby
Widening
(LA
173) 








16,000,000
 160
Shreveport LA Streets/Roads Wallace
Lake
Road
Widening 








16,000,000
 160
Shreveport LA Streets/Roads Youree
Drive
Widening
(Sand
Beach
Blvd.
to
Millicent
Way) 








16,000,000
 160
Shreveport LA Streets/Roads I‐20
Soundwall
(Monkhouse
to
Hearne) 








18,000,000
 180
Shreveport LA Streets/Roads GIS
Program 








20,000,000
 200
Shreveport LA Streets/Roads Fant
Parkway
Extension 








25,000,000
 250
Shreveport LA Streets/Roads City‐Wide
Concrete
Replacement 








30,000,000
 300
Shreveport LA Streets/Roads City‐Wide
Sidewalk
Repair 








30,000,000
 300
Shreveport LA Streets/Roads Red
River
Crossing
at
70th
Street
Bridge 








35,000,000
 350
Shreveport LA Streets/Roads LA
3132
(Flournoy‐Lucas
to
Highway
1) 








38,000,000
 380
Shreveport LA Streets/Roads Southern
Loop
Extension 








40,000,000
 400
Shreveport LA Streets/Roads South
Lakeshore
Drive
Widening 










5,000,000
 500
Shreveport LA Streets/Roads Traffic
Signal
Improvements
(ITS) 








78,000,000
 780
Shreveport LA Streets/Roads City‐Wide
Neighborhood
Street
Improvements 






130,000,000
 1300
Shreveport LA Streets/Roads I‐49
North
($288M
total
unfunded
construc3on,
$182M
ready
to
bid) 






288,000,000
 2880
Shreveport LA Transit Digital
Security
System
at
Maintenance
Facility 














25,000
 1
Shreveport LA Transit One
(1)
Bus‐Washing
System 












150,000
 1
Shreveport LA Transit One
(1)
Wrecker
Truck 












200,000
 1
Shreveport LA Transit Trash
receptacles
for
120
bus
stops 














84,000
 1
Shreveport LA Transit Two
(2)
Paratransit
Vans 














72,000
 1
Shreveport LA Transit Upgrade
Security
Camera
Systems
for
Buses
and
Terminals 












150,000
 1
Shreveport LA Transit AVL
System
for
Transit
Buses 












350,000
 3
Shreveport LA Transit Renova3ons
of
Bus
Stops 










1,000,000
 10
Shreveport LA Transit CNG
Fast‐Fill
Filling
Sta3on 












150,000
 15
Shreveport LA Transit CNG
Slow‐Fill
Filling
Sta3on 










1,500,000
 15
Shreveport LA Transit Remodel
Terminal
‐
including
all
ADA‐compliance 










3,000,000
 30
Shreveport LA Transit Seventeen
(17)
CNG
buses 










7,000,000
 35
City State Program Project
Descrip3on Funding
Required Jobs
Shreveport LA Water Lucas
WWTP
Effluent
Line
Repair 












250,000
 2
Shreveport LA Water Repair
and
Upgrade
of
Pine
Hills
Lib
Sta3on 












250,000
 2
Shreveport LA Water Waste
Grease
Collec3on
Equipment 












250,000
 2
Shreveport LA Water Construc3on
of
Lib
Sta3on
Maintenance
Building 










1,000,000
 10
Shreveport LA Water Repair
and
Upgrade
of
Hardy
Lib
Sta3on 










1,000,000
 10
Shreveport LA Water Southeast
Shreveport
Wallace
Lake
Water
Line 










1,200,000
 12
Shreveport LA Water Repair
and
Upgrade
of
Broadmoor
Lib
Sta3on 










1,300,000
 13
Shreveport LA Water Repair
and
Upgrade
of
South
Highland
Lib
Sta3on 










1,300,000
 13
Shreveport LA Water Repair
and
Upgrade
of
Darien
Lib
Sta3on 










1,500,000
 15
Shreveport LA Water Supervisory
Control
and
Data
Acquisi3on
(SCADA)
Upgrade 










1,500,000
 15
Shreveport LA Water Repair
and
Upgrade
of
Agurs
Lib
Sta3on 










2,000,000
 20
Shreveport LA Water Repair
and
Upgrade
of
North
Regional
WWTP
Effluent
Line
and
Ouzall 










2,500,000
 25
Shreveport LA Water Amiss
WTP
New
High
Service
Pumps 










2,800,000
 28
Shreveport LA Water Emergency
Generators
at
Lucas
Wastewater
Treatment
Plant
and
North
Regional
Water
Treatment
Plant 










3,000,000
 30
Shreveport LA Water Lib
Sta3on
Control
and
Communica3on
Panel
Upgrades 










3,000,000
 30
Shreveport LA Water Amiss
WTP
Raw
Water
Pipe
Modifica3ons 










3,600,000
 36
Shreveport LA Water North
Regional
Water
Treatment
Plant
Sludge
System
Improvements 










3,600,000
 36
Shreveport LA Water Amiss
WTP
Emergency
Generators 










4,000,000
 40
Shreveport LA Water Querbes
Lib
Sta3on
Improvements 










4,000,000
 40
Shreveport LA Water North
Regional
Water
Treatment
Plant
Flow
Equaliza3on
Improvements 










4,300,000
 43
Shreveport LA Water Lucas
Lib
Sta3on
Improvements 










5,000,000
 50
Shreveport LA Water Blanchard/Havanna
Water
and
Sewer
Main
Improvements 










6,000,000
 60
Shreveport LA Water Twelve
Mile
Bayou
Pump
Sta3on
Improvements 










7,300,000
 73
Shreveport LA Water Amiss
WTP
Plant
2
Rehabilita3on 










8,000,000
 80
Shreveport LA Water City‐Wide
Lib
Sta3on
Improvements 










8,000,000
 80
Shreveport LA Water AMiss
WTP
Line
and
Caus3c
Feed
Improvements 










9,500,000
 95
Shreveport LA Water Amiss
WTP
Plant
2E
Rehabilita3on 








10,000,000
 100
Shreveport LA Water Improvements
to
Cross
Lake
Dam 








10,000,000
 100
Shreveport LA Water Amiss
Water
Treatment
Plant
Ozone
System
Upgrade 








16,500,000
 165
Shreveport LA Water City‐wide
sewer
system
repair
and
upgrade 








20,000,000
 200
Shreveport LA Water City‐Wide
Water
system
repair
and
upgrade 








20,000,000
 200
Shreveport LA Water Installa3on
of
automated
meter
reading
program 








25,000,000
 250
Shreveport LA Water City‐Wide
Cured
in
Place
Pipe
Repairs
for
Server
Mains 








30,000,000
 300
Shreveport LA Water Dredging
Cross
Lake 








80,000,000
 800
Shreveport LA Water North
Shreveport
30MGD
Water
Treatment
Plant 






160,000,000
 1600
Shreveport LA Water South
Shreveport
30MGD
Water
Treatment
Plant 






160,000,000
 1600
Amesbury MA Energy Site
renewable
energy
projects
at
municipal
facili3es.


 












500,000
 2
Amesbury MA Public
Safety Repair
and
renova3on
of
Police
Building
to
create
a
fully
accessible,
energy
efficient
building 










2,000,000
 10
Amesbury MA Streets/Roads Rebuild
R
Street
Bridge. 












500,000
 25
Amesbury MA Transit Construc3on
and
fit
out
of
Merrimack
Valley
Regional
Transporta3on
Center.

The
center
is
located
in

Amesbury's
downtown
and
will
support
sustainable
transit‐oriented
development
and
provide
energy
efficient

municipal
office
space. 










2,000,000
 50
Amesbury MA Water Replace
water
infrastructure
beneath
Elm
Street.

Needed
before
street
improvements
can
be
made 










1,000,000
 15
Boston MA CDBG 329‐331
West
Broadway‐2,300
square
feet
Commercial
Space 












200,000

Boston MA CDBG Quincy
Street‐Blue
Hill
Ave‐‐Development
of
Parcels
to
Support
Blue
Hill
Ave.
Business
District 












425,000

Boston MA CDBG Repair
and
renovate
the
animal
shelter 












365,000

Boston MA CDBG Masonry
repairs
at
Engine
41 












500,000
 4
Boston MA CDBG Great
Hall
at
Codman
Square:
masonry
and
accessibility
improvements 












870,000
 6
Boston MA CDBG Masonry
repairs
at
the
Vine
Street
and
Paris
Street
Centers 










1,100,000
 10
Boston MA CDBG Repair
and
stabilize
seawall
at
the
Boston
Fire
Department's
Training
Facility
on
Moon
Island 










1,340,000
 10
Boston MA CDBG Waterproofing,
HVAC,
window
repair
at
municipal
annex 










1,500,000
 12
Boston MA CDBG Slab
Shoring
and
sealing
at
8
fire
sta3ons 










2,000,000
 16
Boston MA CDBG Charlestown
Navy
Yard
Pier
4
improvements 










1,550,000
 19
Boston MA CDBG Curley
Community
Center
Roof
Replacement 










2,500,000
 20
Boston MA CDBG Renovate
and
upgrade
facili3es
at
two
Community
Centers 










2,500,000
 20
Boston MA CDBG Boston
Marine
Industrial
Park
Phase
1
‐
Rail
improvements 










1,745,000
 25
Boston MA CDBG Boston
Marine
Industrial
Park‐Razing
of
6
Tide
Street 










1,600,000
 25
Boston MA CDBG Brownfields
Sites‐
Lewis
Chemical
and
B‐Street
Extension 










3,000,000
 25
Boston MA CDBG Roof
replacement
at
four
branch
libraries 










3,350,000
 25
Boston MA CDBG Brighton
Branch
Library
Renova3on 










5,500,000
 45
Boston MA CDBG Newmarket
Square
Industrial
District‐Infrastructure
Improvements
 










1,800,000
 45
Boston MA CDBG East
Boston
Stadium
improvements 










6,000,000
 48
Boston MA CDBG Boston
Marine
Industrial
Park‐
Access
Road
Industrial
Improvements 










4,600,000
 85
Boston MA Energy City
of
Boston
Renewable
Energy
Installa3ons 










4,450,000
 25
Boston MA Energy Boston
Integrated
Energy
Management
Plan
Implementa3on 










8,000,000
 40
Boston MA Energy Residen3al
Energy
Efficiency
Program
(Low
and
Moderate
Income) 










6,000,000
 40
Boston MA Housing Boston
Housing
Capital
Project
Accelera3on
for
Family
and
Elderly
Housing 








28,000,000
 280
Boston MA Public
Safety Shotspofer

Expansion 












241,500

Boston MA Schools Technology
Goes
Home
expansion
to
2000
families 










2,000,000

Boston MA Schools Electrical
Upgrades
at
3
schools 










1,700,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Boston MA Schools Accessibility
Projects 










2,000,000
 16
Boston MA Schools Window
replacements
at
various
schools 










2,900,000
 20
Boston MA Schools Upgrade
or
replace
Fire
Systems
at
various
schools 










3,000,000
 24
Boston MA Schools Upgrade
or
repair
HVAC
at
various
schools 










4,000,000
 32
Boston MA Schools Middle
School
renova3on 










5,000,000
 40
Boston MA Schools Roof
Replacements
at
various
schools 










5,000,000
 40
Boston MA Schools Exterior
and
masonry
repairs
at
various
schools 










6,000,000
 48
Boston MA Streets/Roads Bike
Lanes
Network
Expansion 










3,200,000
 24
Boston MA Streets/Roads Broad
Street 










4,500,000
 50
Boston MA Streets/Roads American
Legion
Highway
Bridge 










7,000,000
 56
Boston MA Streets/Roads Roadway
Reconstruc3on
in
priority
areas 








15,000,000
 120
Boston MA Streets/Roads Sidewalk
Reconstruc3on
and
Pedestrian
Ramps 








30,000,000
 240
Boston MA Transit Traffic
Management
Technology
Improvements 










3,000,000

Brockton MA CDBG 10
City
Sidewalk
Plows 












850,000
 5
Brockton MA CDBG DPW
Equipment
Needs 










2,827,000
 5
Brockton MA CDBG Downtown
Store
Front
Project 










1,500,000
 10
Brockton MA CDBG Cosgrove
City
Pool
Restora3on
Project 












650,000
 15
Brockton MA CDBG Lifle
League/Field
Ligh3ng
Project
(8) 












320,000
 15
Brockton MA CDBG Manning
Pool
Upgrade 












350,000
 20
Brockton MA CDBG Parmenter
Field
Turf
Project
(2) 










2,200,000
 20
Brockton MA CDBG Skateboard
Park
(2) 












400,000
 20
Brockton MA CDBG War
Memorial
Phase
3
Restora3on 










1,200,000
 20
Brockton MA CDBG Fire
Sta3ons
Restora3on 










3,500,000
 30
Brockton MA CDBG SouthSide
Fire
Sta3on
Reconstruc3on 










3,000,000
 30
Brockton MA CDBG Snow
Park
Phase
Two
Project 










1,200,000
 40
Brockton MA CDBG Downtown
Parking
Garage 










7,100,000
 50
Brockton MA CDBG Improvements
and
Sprinkler
System
for
Historical
City
Hall 










1,950,000
 50
Brockton MA CDBG New
Oak
and
Bafle
Street
Fire
Sta3on 










6,500,000
 50
Brockton MA CDBG 3
Police
Sub
Sta3ons
for
New
ComStat
Sytem
and
Community
Police
Model 










1,200,000
 60
Brockton MA CDBG DW
Field
Park
and
Golf
Restora3on
Project 










1,200,000
 70
Brockton MA CDBG Brockton
Youth
Indoor
Sports
Complex 










7,600,000
 80
Brockton MA CDBG Brockton
Curtural
Arts
Center
at
The
Corcoran
Building 








11,000,000
 100
Brockton MA CDBG Public
Safety
Building 








27,000,000
 100
Brockton MA CDBG School
Conversion
to
Teen/Youth
Center 










3,500,000
 130
Brockton MA Energy Grove
Street
#2
Solar
Array
Project 










5,000,000
 20
Brockton MA Energy Solar
Panels
electricity
and
water
Marciano
Stadium 












500,000
 20
Brockton MA Energy Develop
Solar
Field
at
the
Landfill 










4,000,000
 30
Brockton MA Energy Solar
Panels
in
schools 










2,500,000
 40
Brockton MA Energy Renewable
Energy
(Wind
or
Solar) 










8,000,000
 50
Brockton MA Housing Expend
the
Walnut‐Turner
ini3a3ve 








12,000,000
 20
Brockton MA Housing Hawley
Street
Housing
Complex
Restora3on 










1,500,000
 25
Brockton MA Housing Sullivan
Housing
Towers
Restora3on 










1,500,000
 25
Brockton MA Housing Homeowners
Rehab
Program 










5,000,000
 50
Brockton MA Housing Kennedy
Housing
Drive
Restora3on 










2,500,000
 50
Brockton MA Housing Washburn
Heights
Housing
Complex
Restora3on 










4,500,000
 50
Brockton MA Housing Buy
Brockton
Mul3‐Family
Phase 








10,000,000
 100
Brockton MA Housing Senior
Housing
High‐Rise
Restora3on
Project
(4) 










4,000,000
 100
Brockton MA Public
Safety Gun
Detec3on
Systems 












916,000

Brockton MA Public
Safety Handheld
Radios 












300,000

Brockton MA Public
Safety Police
Cruisers
(30) 










1,050,000

Brockton MA Public
Safety Surveleillance
Cameras 












160,000

Brockton MA Public
Safety 10
Police
Motorcycles 












300,000
 0
Brockton MA Public
Safety 10
Segway
X2
Police
Units 














75,000
 0
Brockton MA Public
Safety BEMA
Light
Duty
Rescue
Unit 














95,000
 0
Brockton MA Public
Safety Emergency
Back‐up
Generators
(4) 














40,000
 0
Brockton MA Public
Safety Fire
Pump
Units
(2) 










1,000,000
 0
Brockton MA Public
Safety Haz‐Mat
Unit
Fully
NFPA
1901
compliant 












250,000
 0
Brockton MA Public
Safety Portable
Emergency
Generators
(10) 















5,000
 0
Brockton MA Public
Safety Command
Center
Faber
Model:
S39WB‐MT55‐260HP 












478,000
 2
Brockton MA Public
Safety Street
Outreach
Worker
Program 












485,000
 6
Brockton MA Public
Safety Fire
Fighters
(2yrs) 










4,300,000
 40
Brockton MA Public
Safety Police
Officers
and
Training
(2
yrs) 










5,300,000
 50
Brockton MA Public
Safety Brockton
Aber
Dark
Support
Project 












350,000
 100
Brockton MA Schools South
Jr
High
Baseball
Field
Reconstruc3on 










1,000,000
 15
Brockton MA Schools High
School
Parking
Restora3on 










2,000,000
 20
Brockton MA Schools North
Jr
High
Soccer
and
Football
Field
Reconstruc3on 










1,500,000
 25
Brockton MA Schools 10
Elementary
schools
Air
Quality
Improvements 










2,000,000
 40
Brockton MA Schools Brockton
High
Renova3ons 










2,500,000
 40
Brockton MA Schools High
School
Stadium
Renova3ons 










2,500,000
 40
Brockton MA Schools HVAC
at
the
High
School 










8,500,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
Brockton MA Schools 6
School
Play
areas 












300,000
 60
Brockton MA Schools Retrofiqng
Junior
High
with
energy
Effecient
windows
and
doors 










4,000,000
 60
Brockton MA Schools 8
schools
Roof
Repair/Renova3on 










1,600,000
 80
Brockton MA Schools Cafetaria
Upgrades
8
schools 










4,000,000
 80
Brockton MA Schools Upgrading
the
4
Jr
High
Schools
needs
to
include
AC
instala3on
in
Auditorium 










8,000,000
 80
Brockton MA Streets/Roads Court
Street 










4,500,000
 15
Brockton MA Streets/Roads West
Elm
Street 










2,000,000
 15
Brockton MA Streets/Roads Widen
Belmont
Street
near
the
VA. 










4,500,000
 15
Brockton MA Streets/Roads Alger
Street
restora3on 










1,500,000
 20
Brockton MA Streets/Roads Bates
Road
Resurfacing 












600,000
 20
Brockton MA Streets/Roads East
Street
Phase
Two
Reconstruc3on 










2,750,000
 20
Brockton MA Streets/Roads Field
Street
Reconstruc3on 












525,000
 20
Brockton MA Streets/Roads Pleasant
Street 










2,000,000
 20
Brockton MA Streets/Roads Tina
Ave
Resurfacing
and
Sidewalks 












273,000
 20
Brockton MA Streets/Roads Center
Street 










4,000,000
 25
Brockton MA Streets/Roads Crescent
Street 










4,000,000
 25
Brockton MA Streets/Roads Plain
Street
Reconstruc3on 










2,900,000
 30
Brockton MA Streets/Roads Carl
Ave
Resurfacing
and
Sidewalks 










2,250,000
 40
Brockton MA Streets/Roads Downtown
Circula3on 










6,500,000
 40
Brockton MA Streets/Roads Montello
Street
Reconstruc3on 










2,500,000
 40
Brockton MA Streets/Roads North
Cary
Street
Reconstruc3on 










2,650,000
 40
Brockton MA Streets/Roads Pine
Street
Reconstruc3on 










2,250,000
 40
Brockton MA Streets/Roads Main
Street
Reconstruc3on 










3,500,000
 45
Brockton MA Streets/Roads Forest
Ave
Reconstruc3on 










3,400,000
 50
Brockton MA Streets/Roads West
Chestnut
Street
Reconstruc3on 










2,900,000
 50
Brockton MA Transit Camera
System
for
Fixed
Route
Buses 












250,000
 1
Brockton MA Transit AVL/GPS
for
Paratransit
Fleet 










1,000,000
 2
Brockton MA Transit Brockton
Aber
Dark
Bus 












325,000
 2
Brockton MA Transit Fixed
Route
Hybrid
Buses
(6)
at
$540,000
each 










3,240,000
 2
Brockton MA Transit Revenue
Collec3on
Equipment 










1,000,000
 2
Brockton MA Transit Fixed
Route
Transit
Coaches
(16)
at
$325,000
each 










5,200,000
 4
Brockton MA Water Collec3on
System
Rehab 










3,000,000
 15
Brockton MA Water Alger
Street
sewer
lines 










2,000,000
 30
Brockton MA Water Main
Street
water
main
Restora3on 










5,000,000
 50
Brockton MA Water Montello
Street
water
main
Restora3on 










5,000,000
 50
Brockton MA Water Brockton
Area
Regional
Wastewater
Management
Project 








50,000,000
 222
Chicopee MA Airport Terminal
upgrade/Westover
Metropolitan
Airport/State
bond 








20,000,000
 20
Chicopee MA Airport Airpark
South/extension
of
Airpark
West
Industrial
Park
on
100
access/access
and
infrastructure 








20,000,000
 25
Chicopee MA CDBG Courthouse
Parking
Lot
‐‐
improvements
and
expansion 












500,000
 10
Chicopee MA CDBG Downtown
Parking
Lots 












700,000
 10
Chicopee MA CDBG Downtown
sidewalk
replacement 












500,000
 10
Chicopee MA CDBG Downtown
Fire
Sta3on
replacement 










4,000,000
 15
Chicopee MA CDBG Safety
Complex 










5,000,000
 15
Chicopee MA CDBG Senior
Center 










8,000,000
 15
Chicopee MA CDBG City
Hall
reorganiza3on
and
former
Main
Library
reuse
 










2,300,000
 20
Chicopee MA CDBG Uniroyal/Facemate
industrial
site.
Site
prepara3on,
demoli3on,
and
environmental
remedia3on
to
ready
50

acre
brownfield
riverfront
industrial
site
for
redevelopment.
 








18,200,000
 20
Chicopee MA Energy Energy
efficient
hea3ng
and
cooling
system
for
aging
safety
complex 












300,000
 10
Chicopee MA Energy Energy
efficient
hea3ng
and
cooling
system
for
former
library
to
enhance
reuse
poten3al 












300,000
 15
Chicopee MA Energy Energy
efficient
ligh3ng
upgrade
‐‐
all
municiple
buildings 










9,000,000
 15
Chicopee MA Energy Solarize
municipal
buildings
to
supplement
energy
source 










6,000,000
 25
Chicopee MA Housing Termite
eradica3on
and
repairs
for
various
loca3ons 












500,000
 5
Chicopee MA Housing Parking
lot
repair
for
one
complex 














50,000
 6
Chicopee MA Housing Replace
roof
in
one
complex 












200,000
 6
Chicopee MA Housing Upgrade
150
bathrooms
in
one
complex 










1,200,000
 10
Chicopee MA Housing Upgrade
302
kitchens
in
two
complexes 










3,000,000
 10
Chicopee MA Schools Old
Chicopee
High/conversion
to
middle
school 








14,000,000
 25
Chicopee MA Streets/Roads Traffic
flow
improvements
Memorial
Drive
(Rt
33)/Fuller
Road
intersec3on
for
new
shopping
plaza 










1,500,000
 150
Chicopee MA Water Center
Street
water
main
replacement
in
associa3on
with
full
depth
reconstruc3on
of
Center
Street 










2,300,000
 25
Haverhill MA Amtrak rail
spurs
on
Downeaster
line
by
Newark
Street
industrial
park
and
upper
Hilldale
Avenue
industrial
park
in

Haverhill,
MA
(already
designed) 














60,000
 10
Haverhill MA CDBG new
streetscape,
roadway
improvements,
sidewalks,
drainage
and
trees
in
downtown
Haverhill 










1,500,000
 20
Haverhill MA Energy Haverhill
Ci3zens
Center
renova3on
to
energy
efficient
standards 










2,000,000
 25
Haverhill MA Public
Safety Police
Vehicle
Maintenance
Shed
construc3on 












800,000
 5
Haverhill MA Schools Tilton
School
roof
replacement
and
walls
replacement 










1,200,000
 15
Haverhill MA Schools renovate
Whiqer
Middle
School 








10,000,000
 25
Haverhill MA Schools Haverhill
Stadium
renova3ons 










7,000,000
 40
Haverhill MA Schools new
Hunking
School 








25,000,000
 100
Haverhill MA Streets/Roads Main
Street
signaliza3on 












750,000
 3
Haverhill MA Streets/Roads street
inventory
updgrades 










8,000,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Haverhill MA Streets/Roads Route
97
Corridor
project 












900,000
 20
Haverhill MA Streets/Roads new
Merrimack
River
Boardwalk 










5,000,000
 25
Haverhill MA Transit replace
aging
train
bridge
over
Merrimack
River 










5,000,000
 30
Haverhill MA Water downtown
water
main
replacement
of
80
year
old
system 










2,000,000
 10
Haverhill MA Water Newark
Street
drainage 














20,000
 20
Haverhill MA Water Replace
North
Avenue
dam
by
Frye's
Pond 












850,000
 40
Lynn MA CDBG Build
out
for
LynnCAM
studios 












500,000
 5
Lynn MA CDBG Capital
improvements
to
Mul3‐Service
Center 












450,000
 10
Lynn MA CDBG Purchase
of
21
Central
Ave
for
life
science
center 










1,500,000
 10
Lynn MA CDBG Purchase
of
GE
Factory
of
the
Future
by
EDIC
to
be
used
as
Economic
Industrial
Park 










3,500,000
 10
Lynn MA CDBG Rehabilita3on
of
Whyte’s
Laundry
Site 










1,000,000
 10
Lynn MA CDBG Renova3on
of
Main
Library 










2,000,000
 10
Lynn MA CDBG Restora3on
of
GAR
Building 












100,000
 10
Lynn MA CDBG Restora3on
of
High
Rock
Park 












745,000
 10
Lynn MA CDBG Restora3on
of
Lynn
Common 










1,000,000
 10
Lynn MA CDBG Acquisi3on
of
land
adjacent
to
Community
College
for
College
Book
Store
and
Cafeteria.


Project
will
open
up

classroom
space
for
dental
hygienist
program
and
connect
college
to
downtown
Lynn 










1,000,000
 50
Lynn MA CDBG Reloca3on
of
two
114KV
power
lines
along
waterfront 










5,481,000
 150
Lynn MA Energy Restora3on
of
Memorial
Auditorium
HVAC
Systems 










1,500,000
 5
Lynn MA Energy Installa3on
of
20
16.4
foot
wind
turbines 










3,000,000
 10
Lynn MA Energy School
Boiler
conversions 










2,500,000
 50
Lynn MA Housing Acquisi3on
of
lower
Washington
Street
Property
for
expedited
development 










5,000,000
 50
Lynn MA Public
Safety Emergency
Medical
Dispatch
Electronic
Card
Systems 














22,000
 1
Lynn MA Public
Safety Fire
Dispatch
Instant
Recorder 














10,000
 1
Lynn MA Public
Safety Vesta
Pallas
E911
Call
taking
upgrades 












100,000
 2
Lynn MA Public
Safety Fire
Sta3on
Aler3ng
System 












125,000
 5
Lynn MA Public
Safety Street
Police
Cameras 












500,000
 5
Lynn MA Public
Safety 50
new
resource
officers 










3,750,000
 50
Lynn MA Schools Rehabilita3on
and
reuse
of
O'Keefe
School 










1,900,000
 15
Lynn MA Schools Marshall
Middle
School
rehab
of
roof,
exterior,
hvac 










5,500,000
 50
Lynn MA Schools Rehabilita3on
of
Classical
High
School 








20,000,000
 50
Lynn MA Streets/Roads General
Street
Resurfacing 










1,000,000
 10
Lynn MA Streets/Roads Reconstruc3on
of
Lynnfield
Street,
Millard
Ave,
Den
Quarry
and
Parker
hill 












618,000
 10
Lynn MA Water Commuter
Ferry
Purchase 












250,000
 10
Lynn MA Water Restora3on
of
Flax
Pond
and
implementa3on
of
water
related
ac3vi3es 












350,000
 10
Lynn MA Water Breed
and
Birch
Pond
Dam
Rehabilita3on 










1,800,000
 15
Lynn MA Water Rehabilita3on
of
Seaport
Marina 










1,000,000
 15
Malden MA CDBG Ferryway
Park
Renova3on
‐
Renova3on
of
Ferryway
Park
including
re‐grading
and
addi3ons
and
extension
of

site
drainage
systems
to
allow
proper
drainage
of
the
playing
surface,
reconstruc3on
of
the
exis3ng
natural

grass
sobball/baseball
field
and
mult 












285,000
 14
Malden MA CDBG Miller
Park
Renova3on
‐
Phase
II

Miscellaneous
improvements
to
Miller
Park
including:
general
clearing,
grubbing
and
site
clean
up;
replacing

safety
surfacing
at
exis3ng
play
equipment;
a
new
aqua3c
playground
including
required
u3li3es
and
control 












450,000
 14
Malden MA CDBG Roosevelt
Park
Renova3on
‐
Renova3on
of
Roosevelt
Park
including
replacing
the
exis3ng
natural
grass

sobball/baseball
field
and
mul3‐use
rectangular
playing
field
int
he
ouzield
with
new
infilled
synthe3c
turf;
a

new
sports
ligh3ng
system; 










1,500,000
 22
Malden MA CDBG Macdonald
Stadium
Renova3on
‐
Renova3on
of
Macdonald
Stadium
including
replacing
the
exis3ng
natural

grass
playing
surface
with
new
infilled
synthe3c
turf,
reconstruc3ng
the
exis3ng
running
track
with
a
new
6‐
lane
equal
quadrant
resilient
track,
 










4,400,000
 56
Malden MA CDBG Waif's
Mount
Renova3on
‐
Comprehensive
renova3on
of
Waif's
Mount
including:
general
clearing,
grubbing

and
site
clean
up;
improved
access
road
and
visitor
parking;
interpre3ve
parking
signage;
new
walking
trails

and
paths;
a
new
tot
lot
and
shade
shed 










5,800,000
 76
Malden MA CDBG South
Broadway
Park
Renova3on‐

Renova3on
of
South
Broadway
Park
including
replacing
the
exis3ng
natural
grass
baseball
field
and
mul3‐use

rectangular
laying
field
in
the
ouzield
with
new
infilled
synthe3c
turf;
a
new
sports
ligh3ng
system;
reconf 










6,300,000
 80
Malden MA Schools Jenkins
Auditorium
Performing
Arts
Center
at
Malden
High
School.
Renova3on
and
moderniza3on
of
the

exis3ng
1930‐era
art
deco
styled
Jenkins
Auditorium
at
Malden
High
School
to
create
a
1600
seat
performing

arts
center
for
school
and
aber‐hour
cultural 










6,000,000
 90
Malden MA Streets/Roads Centre
Street/Route
60
Commercial
St.
intersec3on
improvements.
Geometric
improvements
and
upgrade
to

traffic
signal
equipment
at
this
loca3on
to
improve
level
of
service
and
safety. 












750,000
 14
Malden MA Streets/Roads Parking
Garage
Rehabilita3on.
Rehab
of
the
Jackson
Street
Parking
Garage,
the
CBD
Parking
Garage
and
the

Mountain
Ave.
deck
including
concrete
deck
repairs
and
sealing,
expansion
joint
repairs
and
replacement,

pain3ng
of
structural
steel
and
other
misce 










1,500,000
 22
Malden MA Streets/Roads Citywide
Beau3fica3on
Project
Contract
2009‐T‐1
‐‐
Con3nua3on
of
citywide
tree
plan3ng
and
landscaping

program.

Five
hundred
street
trees
would
be
planted
under
this
project. 












500,000
 28
Malden MA Streets/Roads Traffic
Signal
Improvements
Contract
‐‐
Replacement
and/or
renova3on
of
traffic
signals
and
associated

equipment
at
several
intersec3ons.

 










1,000,000
 28
Malden MA Streets/Roads Malden
Downtown
Central
Business
District
Revitaliza3on
Project
Phase
II.
City
of
Malden
determined
to

revitalize
a
once
thriving
retail
and
commercial
district
proposes
to
enhance
the
downtown
area
by
providing

improved
pedestrian
connec3ons
and
street 










1,093,950
 31
Malden MA Streets/Roads Pleasant
St.‐Malden
Downtown
Revitaliza3on
Project
(Mass.
Highway
605173).
The
City
of
Malden
determined

to
revitalize
a
once
thriving
retail
and
commercial
district
proposes
to
enhance
the
Pleaant
St.
downtown
area

by
providing
improved
pedestrian
conne 










2,526,000
 31
City State Program Project
Descrip3on Funding
Required Jobs
Malden MA Streets/Roads Pleasant
Street
Parking
Deck.
Construc3on
of
a
2‐story
100‐space
parking
deck
on
the
site
of
the
former
YMCA

in
Malden
Square.
This
facility
situated
in
the
Central
Business
District
will
provide
addi3onal
parking
in
the

downtown
area
for
patrons
and
em 










1,750,000
 34
Malden MA Streets/Roads Broadway
Sidewalk
and
Roadway
Improvements
‐‐
Reconstruc3on
of
approximately
4800
linear
feet
of

roadway
pavements
and
sidewalks
on
Broadway
(Route
99)
from
Salem
Street
to
the
Malden/Saugus
city
line.


The
work
will
include
replacing
deficient
roadway
p 










3,500,000
 44
Malden MA Streets/Roads Pavement
Rehabilita3on
Program
(Citywide)
‐‐
Repair,
rehabilita3on
and
reconstruc3on
of
roadway
pavements

in
miscellaneous
loca3ons
to
be
determined
throughout
the
city.

The
work
will
include
crack
sealing;
replacing

deficient
roadway
patches;
millin 










3,500,000
 44
Malden MA Streets/Roads Route
60/Commercial
St.
Pedestrian
Overpass.
Construc3on
of
a
pedestrian
bridge
across
Commercial
and

Centre
streets
to
provide
a
safe,
accessible
pedestrian
connec3on
between
the
MBTA's
Malden
Center
Orange

Line
Sta3on
and
a
9‐acre
development
site
si 










7,000,000
 88
Malden MA Streets/Roads Florence
Street
Parking
Garage.
Construc3on
of
a
250‐space
parking
garage
on
the
site
of
the
exis3ng

municipal
surface
parking
lot
on
Florence
Street.
This
facility
situated
in
the
city's
downtown
central
business

district
and
civic
center
will
provide
 










7,200,000
 90
Malden MA Streets/Roads Salem
Street/Overlook
Ridge
Drive/Route
1
Access
Reconstruc3on
City
of
Malden
in
conjunc3on
with
City
of

Revere
‐‐
Arterial
roadway
construc3on
including
site
work,
milling,
pavement,
curbs
and
sidewalks.

Project

intended
to
provide
new
access
connect 














10,000
 170
Malden MA Streets/Roads Government
Center
Reloca3on.
Reloca3on
of
Malden's
municipal
offices
from
their
current
loca3on
at

Government
Center
in
order
to
demolish
the
building
and
reconnect
the
road
that
it
made
a
dead‐end,
thereby

choking
business
to
the
exis3ng
retailers.
T 








15,000,000
 190
Malden MA Streets/Roads Wellington
Circle
Improvements,
Medford,
MA
‐‐
Comprehensive
reconfigura3on,
realignment
and

reconstruc3on
of
Wellington
Circle
(the
intersec3on
of
Route
16
and
Route
28)
including
grade
separa3on
of

Rt.
16
and
Rt.
28.

This
project
is
a
significant
e 








60,000,000
 700
Malden MA Water Municipal
Drainage
System
Rehabililta3on
Program
(Citywide).
Clean
and
rehab
por3ons
of
the
city's
municipal

storm
drain
system
at
loca3ons
throughout
the
city.
The
municipal
drainage
system
consists
of
approx.
80
miles

of
drainage
pipes
and
culverts
a 










1,500,000
 18
Malden MA Water Public
Works
Improvement
Program
Contract
2009‐S‐2
(Citywide
Sewer
Rehabilita3on).
Rehabilita3on
and/or

replacement
of
approx.
12,500
LF
of
wastewater
collec3on
and
conveyance
piping
including
in‐situ
lining,

replacement/spot
repair
of
structurally
def 










2,500,000
 32
Malden MA Water Public
Works
Improvements
Program
Contract
2009‐H/W‐1.
Replacement
of
approx.
5,000
LF
of
circa‐1900

unlined
cast
iron
water
mains
with
new
cement‐lined
duc3le
iron
pipe,
including
replacement
of
approx.
150

lead
residen3al
and
commercial/industrial
ser 










3,200,000
 32
Malden MA Water Public
Works
Improvements
Program
Contract
2009‐H/W‐2.
Replacement
of
approx.
5,000LF
of
circa‐1900

unlined
cast
iron
water
mains
with
new
cement‐lined
duc3le
iron
pipe,
including
replacement
of
approx.
150

lead
residen3al
and
commercial/industrial
serv 










3,200,000
 32
Malden MA Water Public
Works
Improvements
Program
Contract
2009‐S‐1
(Citywide
Sewer
Rehabilita3on).
Rehab
and/or

replacement
of
approx.
12,500
LF
of
wastewater
collec3on
and
conveyance
piping
including
in‐situ
lining,

replacement
of
structurally
deficient
vitrified
cla 










2,500,000
 32
Malden MA Water Replacement
of
approx.
1,000
lead
residen3al
and
commercial/industrial
service
connec3ons
with
new
copper

tubing. 










4,500,000
 36
Northampton MA Streets/Roads Manhan
Rail
Trail
‐
2.4
miles 










3,100,000
 18
Northampton MA Streets/Roads Hinckley
Street
Repaving 










1,000,000
 24
Northampton MA Streets/Roads Milton
Street
Repaving 










1,500,000
 24
Northampton MA Streets/Roads Pavement
Management
‐
100
road
miles 








15,000,000
 30
Northampton MA Water Slip
lining
sewer
mains 










1,000,000
 5
Northampton MA Water Flood
Control
‐
Dike,
levee
and
pump
sta3on
upgrades 












500,000
 6
Northampton MA Water Installa3on
of
Zinc
Orthophosphate
Chemical
Feed
at
Water
Treatment
Plant 












700,000
 8
Northampton MA Water Repalcement
of
Sewer
Mains 










4,000,000
 10
Northampton MA Water Upgrade
well
chlorina3on
equipment
at
two
wells 












695,000
 12
Northampton MA Water Replace
Cast
Iron
and
Asbestos
Cement
Water
Mains
‐
20
miles 










6,000,000
 15
Quincy MA Streets/Roads U3lity
and
Road
replacement
for
cross
town
connector 










5,000,000
 300
Quincy MA Water Repair
Pump
Sta3ons
and
Water
Tanks

 










3,000,000
 55
Quincy MA Water Implementa3on
of
a
city
wide,
fixed
radio,
Automated
Meter
Reading
System.

Project
includes
meters,

transmifers,
sobware
and
antennas.
 










9,000,000
 150
Quincy MA Water Replacement
of
all
Water
Mains
that
are
75
years
or
older.
 








30,000,000
 900
Woburn MA CDBG Leland
Site
Remedia3on 










3,000,000
 20
Woburn MA Public
Safety Main
Street
Corridor
Traffic
Signal
Upgrades 










1,100,000
 3
Woburn MA Public
Safety Police
Sta3on
Roof
Replacement 












350,000
 8
Woburn MA Schools Joyce
Middle
School
Roof
Replacement 










1,250,000
 8
Woburn MA Schools Kennedy
Middle
School
Roof
Replacement 










1,650,000
 9
Woburn MA Schools Plympton
School
Rehabilita3on 










1,550,000
 12
Woburn MA Streets/Roads Magazine
Hill
Parking
Lot
Project 










2,000,000
 6
Woburn MA Streets/Roads Main
Street
Roadway
andSidewalk
Reconstruc3on 










2,400,000
 8
Woburn MA Streets/Roads Woburn
Bike
Loop
Project 










1,610,000
 8
Woburn MA Streets/Roads Forest
Park
Cemetery
Project 










4,200,000
 9
Woburn MA Streets/Roads Woburn
Public
Library
Addi3on 








20,000,000
 16
Woburn MA Water Dix
Road
Private
Source
Removal 












445,000
 5
Woburn MA Water Hart
Street
Drainage
Improvements 










1,400,000
 6
Woburn MA Water Cleaning
and
Relining
Project
Year
4 










1,400,000
 8
Woburn MA Water Watermain
Improvement
Project 












310,000
 8
Woburn MA Water Dix
Road
Sewer
Pump
Sta3on
Rehabilita3on 












969,000
 9
Woburn MA Water Residen3al
Water
Meter
Replacement
Project 












550,000
 10
Woburn MA Water Area
3
Sewer
Rehabilita3on‐Repairs
to
30,000
b
of
sewer
mains 










2,445,000
 26
Woburn MA Water Water
Treatment
Plant
Addi3on
and
Tank 








24,500,000
 37.5
Annapolis
 MD Energy environmental
impact
programs 










1,400,000
 3
City State Program Project
Descrip3on Funding
Required Jobs
Annapolis
 MD Energy annapolis
e
z...a
funding
program
for
residents
to
reduce
their
carbon
footprints
and
training
programs
to
meet

new
green
technologies 










2,650,000
 25
Annapolis
 MD Energy new
silver
led
recrea3on
center 








13,000,000
 25
Annapolis
 MD Public
Safety 911
technology 












560,000
 2
Annapolis
 MD Public
Safety addi3on
of
emergency
opera3on
center
at
police
headquarters 










8,000,000
 6
Annapolis
 MD Public
Safety undergrounding
of
u3lity
lines
in
the
historic
district 








11,000,000
 11
Annapolis
 MD Streets/Roads sidewalk
improvement
along
all
city
streets‐annual
demand 










1,000,000
 4
Annapolis
 MD Streets/Roads match
to
highway
user
funds
for
repair
and
maintenance
of
city
streets 










1,800,000
 10
Annapolis
 MD Transit expand
sta3on
passenger
capacity
for
major
bus
transporta3on
terminus 










1,200,000
 3
Annapolis
 MD Transit add
new
trolley
system
fromcounty
shopping
areas
to
center
of
historic
city 










1,700,000
 6
Annapolis
 MD Transit expand
bus
maintence
capacity 












750,000
 10
Annapolis
 MD Water stormwater
retrofits 










5,000,000
 2
Annapolis
 MD Water nutrient
reduc3on
program 












329,000
 4
Annapolis
 MD Water sewer
line
reconstruc3on 










4,500,000
 5
Annapolis
 MD Water first
urban
watershed
plan
imploemented 










3,200,000
 7
Annapolis
 MD Water 2
wells
and
80
year
old
waterplant
reconstruc3on 








23,000,000
 18
Balitmore
 MD Public
Safety Citywide
Traffic
Detector
Replacement 










3,000,000

Balitmore
 MD Public
Safety Electronic
Traffic
Devices
Communica3on

Enhancements
Communica3ons
for
Signals 










2,000,000

Balitmore
 MD Public
Safety Install
Data
Communica3ons
Equipment
for
traffic
management
Center
and
Field
Offices 










2,000,000

Balitmore
 MD Public
Safety Signal
Op3miza3on
‐
Phase
III 










1,500,000

Balitmore
 MD Public
Safety Traffice
Signal
Reconstruc3on
and
Rewiring 










1,000,000

Balitmore
 MD Public
Safety Variable
Message
Signs‐Replacement
and
installa3on
at
24
loca3ons 










2,650,000

Balitmore
 MD Schools #102
Thomas
G.
Hayes
Elem
Fire
Safety 












350,000
 4
Balitmore
 MD Schools #13
Tench
Tilghman
ES/MS
Elevator
Renova3on 












500,000
 4
Balitmore
 MD Schools #254
Mar3n
Luther
King
MS/HS
Fire
Safety 












350,000
 4
Balitmore
 MD Schools #34
Roland
Park
ES/MS 












500,000
 4
Balitmore
 MD Schools #181
Southside
Academy
HS
Science
Lab 










1,000,000
 7
Balitmore
 MD Schools #403
Bal3morre
Polytechnic
Inst.
Locker
room
Renova3on
 










1,000,000
 7
Balitmore
 MD Schools #411
Walbrook
HS
Science
Lab 










1,000,000
 7
Balitmore
 MD Schools #78
Harlem
Park
Science
Lab
 










1,000,000
 7
Balitmore
 MD Schools #215
Highlandtown
ES/MS
Fire
Safety 










1,200,000
 10
Balitmore
 MD Schools #401
Northwestern
HS
Fire
Safety 












900,000
 10
Balitmore
 MD Schools #419
Reginald
S.
Lewis
School
of
Business
Bldg.
science
Lab 










2,000,000
 14
Balitmore
 MD Schools #170/424
Thurgood
Marshall
HS
Fire
Safety
and
Science
Lab 










3,000,000
 21
Balitmore
 MD Schools #226
Violetville
Pre
K‐8
Renova3on/Addi3on 








20,000,000
 140
Balitmore
 MD Schools #245
Leithwalk
Pre‐K
Renova3on/Addi3on 








45,500,000
 322
Balitmore
 MD Streets/Roads Washington
Blvd
Streetscape 










8,500,000
 6
Balitmore
 MD Streets/Roads Park
Heights
Avenue
Streetscape 










2,400,000
 17
Balitmore
 MD Streets/Roads Southeast
Area
Intersec3on
Improvements 










2,500,000
 18
Balitmore
 MD Streets/Roads Bridge
preventa3ve
maintenance 










3,000,000
 21
Balitmore
 MD Streets/Roads Wilkens
Avenue
Bridge 










6,300,000
 44
Balitmore
 MD Streets/Roads Sinclair
Lane
Bridge 










6,500,000
 46
Balitmore
 MD Streets/Roads Argonne
Drive
Bridge 










7,000,000
 49
Balitmore
 MD Streets/Roads Dundalk
Avenue
Streetscape 








10,000,000
 70
Balitmore
 MD Streets/Roads Orleans
Street
Streetscape 








10,600,000
 74
Balitmore
 MD Streets/Roads Northern
Parkway
Rehabilita3on 








11,500,000
 81
Balitmore
 MD Streets/Roads Frederick
Avenue
Bridge 








15,000,000
 105
Balitmore
 MD Streets/Roads Citywide
Resurfacing 








30,000,000
 210
Balitmore
 MD Water Locust
point
Water
Wastewater
PS
Force
Main
Replacement
 










1,100,000
 10
Balitmore
 MD Water Chlorine
Dechlorina3on
Facili3es
Process
Conversion
at
PW
wastewater
treatment
plant 










2,800,000
 16
Balitmore
 MD Water Primary
Sefling
Tanks
Rehabilita3on
Back
River
Waste
Water
 








15,000,000
 105
Balitmore
 MD Water Water
Infrastructure
Rehabilita3on 








18,200,000
 128
Balitmore
 MD Water Chlorine
Disinfec3on 








35,500,000
 249
Balitmore
 MD Water Montebello
Finished
Water
Reservoir
Improvements 








50,000,000
 350
Lewiston ME Airport Reconstruc3on
of
East
Side
I3nerant
Apron 












550,000
 10
Lewiston ME Airport Reconstruc3on
of
West
Side
I3nerant
Apron 










1,900,000
 10
Lewiston ME Airport Reconstruc3on
of
5,000'
Main
Runway
(4/22)
which
is
18
years
old 










2,500,000
 15
Lewiston ME CDBG Re‐establishment
of
Sunnyside
Park
‐
City
Staff
and
Elected
Officials
have
been
Working
with
a
Local

Neighborhood
Group
in
This
Regard,
as
the
Playground
is
in
a
State
of
Disrepair
and
Contains
Only
a
Single

Working
Swing
Set.

 














30,000
 0
Lewiston ME CDBG Establishment
of
Two
(2)
Dog
Parks 














50,000
 2
Lewiston ME CDBG For
New
Community
Center,
Employment
of
Three
Permanent
Employees
to
include
1
Recrea3on
Coordinator

at
$40,000,
one
Recrea3on
Specialist
at
$35,000
and
one
support
person
at
$30,000. 












105,000
 3
Lewiston ME CDBG Ligh3ng
of
Municipal
Buildings 












125,000
 3.5
Lewiston ME CDBG Kennedy
Park
Master
Plan
Implementa3on
‐
Comple3on
of
Pool
House
and
Expenses
Associated
with
the

Installa3on
of

Playground
Equipment. 












350,000
 10
Lewiston ME CDBG Construc3on
of
Community
Center
(40
KSF) 










5,800,000
 20
Lewiston ME CDBG Parking
Garage
Construc3on
(425+
cars)











9,000,000
 25
Lewiston ME CDBG Island
Point
Infrastructure
Improvement 










2,000,000
 60
Lewiston ME Energy City
Buildings
Energy
Improvements 












875,000
 3
City State Program Project
Descrip3on Funding
Required Jobs
Lewiston ME Energy City
Buildings
Energy
Improvements
(Ligh3ng,
City
Hall
HVAC,
Mul3‐Purpose
Center
Window
Replacement) 












650,000
 3
Lewiston ME Energy Municipal
Single
Stream
Sor3ng
Facility 










8,000,000
 37
Lewiston ME Housing Stairwell
Renova3ons
at
Elderly
Sites 














87,000
 0.7
Lewiston ME Housing Smoke
Detector
Upgrades
at
All
Sites 












153,000
 1.3
Lewiston ME Housing Apartment
Kitchen
Renova3ons
at
Family
Sites 












368,000
 3
Lewiston ME Public
Safety Purchase
computers,
upgrades
to
exis3ng
computers
including
sobware,
upgrades
to
training
room

equipment. 














30,000
 0
Lewiston ME Public
Safety Purchase
hardware,
sobware,
equipment,
and
furnishings
to
establish
offices. 














45,000
 0
Lewiston ME Public
Safety Civil
Rights
Community
Rela3ons
Liaison
Officer
‐
To
hire
one
officer
to
be
the
liaison
for
between
the
police

and
the
minority
community
and
various
cultures,
ethnic
groups,
etc.
to
assist
with
issues,
laws,
community

percep3ons,
and
vic3miza3on. 














67,540
 1
Lewiston ME Public
Safety Hire
two
officers
to
work
full
3me
in
the
schools,
one
at
the
high
school
and
one
at
the
elementary
schools.

Includes
wages
plus
benefits
for
two
officers. 












135,080
 2
Lewiston ME Public
Safety Livability/Nuisance
Enforcement
Officer
and
Fire
Inspector‐
These
individuals
would
work
with
various
state

and
local
agencies
such
as
code
enforcement,
fire
department,
landlords,
and
tenants
to
enforce
livability

issues
to
include
dilapidated
buildings, 












135,080
 2
Lewiston ME Public
Safety Two
Patrol
Officers 












135,080
 2
Lewiston ME Public
Safety Public
safety
security
cameras 












350,000
 6
Lewiston ME Schools McMahon
School
HAVC
and
Window
Upgrade 










1,800,000
 30
Lewiston ME Schools Montello
School
HAVC
and
Renova3on
Project 










2,500,000
 50
Lewiston ME Streets/Roads Lisbon
Street
Light
Wiring
Replacement 














70,000
 0.5
Lewiston ME Streets/Roads Two
Sidewalk
Snowplows 












200,000
 2
Lewiston ME Streets/Roads Beech
Street
Bridge
Replacement 












500,000
 3
Lewiston ME Streets/Roads Replacement
of
Outdated
Street
Ligh3ng 












400,000
 3
Lewiston ME Streets/Roads Design/Build
Par3al
Depth
Reconstruc3on
of
River
Road
from
South
Avenue
to
the
Maine
Turnpike 










1,300,000
 4
Lewiston ME Streets/Roads Intersec3on
Improvements
at
East
Avenue
and
Russell
Street
and
East
Avenue
and
Bartlef/Pleasant
Streets 












900,000
 4
Lewiston ME Streets/Roads Design/Build
Par3al
Depth
Reconstruc3on
of
River
Road
from
the
Maine
Turnpike
to
Lewiston
Public
Works

Ops
Center 










1,500,000
 5
Lewiston ME Streets/Roads Sidewalk
Repair
and
Replacement 










2,000,000
 7
Lewiston ME Streets/Roads Complete
the
Lewiston
Riverside
Greenway
Bicycle
&
Pedestrian
Path
from
Main
Street
to
College
Street
to

Include
a
Bridge
Across
Jepson
Brook 










2,600,000
 8
Lewiston ME Streets/Roads Gendron
Drive/Priscilla
Drive
Extension
(Business
Park
Expansion) 










2,000,000
 8
Lewiston ME Streets/Roads Full
Depth
Reconstruc3on
of
Local
Streets 










3,000,000
 10
Lewiston ME Streets/Roads Maintenance
Paving
of
Local
Streets 










3,000,000
 10
Lewiston ME Streets/Roads Road
Rehabilita3on
‐
Switzerland
Road
(7,087
b.);
Cofon
Road
(11,006
b.);
River
Road
(7,788
b.);
Pond
Road

(8,504
b.);
College
Street
(17,830
b.);
Crowley
Road
(3,623
b.) 










8,375,700
 25
Lewiston ME Transit Purchase
a
Bus
Washer 












500,000
 1
Lewiston ME Transit Purchase
3
Transit,
Fixed
Route
Buses 










1,000,000
 5
Lewiston ME Transit Build
a
Passenger
Intermodal
Facility
at
the
Auburn‐Lewiston
Airport 










5,000,000
 50
Lewiston ME Water Lake
Auburn
Watershed
Protec3on
Commission
(LAWPC)
Access
Management
Gate 














25,000
 0.25
Lewiston ME Water Hart
Brook
Watershed
Management
Projects
(Urban
Impaired
Stream) 












200,000
 1.5
Lewiston ME Water Sewer
Pump
Sta3on
Upgrades 












270,000
 2.5
Lewiston ME Water Lewiston‐Auburn
Water
Pollu3on
Control
(LAWPCA)
Treatment
Plant
Facili3es:
Repair
(Boilers
‐
$100K,

Disinfec3on
System
Modifica3ons‐$300K,
Wet
Well
Ven3la3on‐$50K,
Compost
Facility
Air
Quality
Imp‐$175K 












625,000
 4
Lewiston ME Water Jepson
Brook
Watershed
CSO
Project 










1,000,000
 5
Lewiston ME Water Drinking
Water
Meter
Replacement 












500,000
 9
Lewiston ME Water Jepson
Brook
Watershed
CSO
Separa3on
Project 










2,200,000
 10
Lewiston ME Water Lewiston‐Auburn
Water
Pollu3on
Control
Authority
(LAWPCA)
Repair
(Solid
Handling
Improvements

$2,250,000,
Aera3on
Basin
Safety
Improvements
$80,000,
Plant
Doors
and
Windows
Replacement
$100,000) 










2,430,000
 12
Lewiston ME Water Rehabilita3on
&
Repair
of
Old
Sewer
Collec3on
Mains 










2,000,000
 13
Lewiston ME Water Stormwater
Collec3on
System
Pipe
&
Channel
Repairs 










2,800,000
 16
Lewiston ME Water Drinking
Water
Transmission
&
Distribu3on
Main
Pipe
Rehabilita3on
&
Repair 










4,000,000
 18
Lewiston ME Water Combined
Sewer
Overflow
projects
(Clean
Water
Act
Management
Plan) 








13,000,000
 35
Lewiston ME Water Canal
System
Rehabilita3on/Redesign 










7,000,000
 145
Portland ME Airport Airport
terminal
apron 










7,800,000
 25
Portland ME Airport Jetport
Terminal
expansion 








66,000,000
 50
Portland ME CDBG Downtown
street
ligh3ng
program
(energy
efficient
ligh3ng
to
create
safe
neighborhoods) 










1,000,000
 6
Portland ME CDBG Bayside
Trail
‐
construct
a
bike‐ped
trail


 










1,000,000
 8
Portland ME CDBG Deering
Oaks
Park
Pond
improvements
to
address
pollu3on
and
algae
blooms,
restore
the
integrity
and
historic
appearance
of
the

pond











2,500,000
 8
Portland ME CDBG Eastern
Promenade
‐
park
improvements
 












600,000
 8
Portland ME CDBG Fitzpatrick
Stadium
(serves
the
local
high
school
teams):ligh3ng
improvements
(replace
with
energy
efficient

lights),
sea3ng,
and
turf
replacement 










2,450,000
 12
Portland ME CDBG Skateboard
Park
at
Dougherty
Field 










2,000,000
 12
Portland ME Energy Police
Dept
‐
replace
windows
with
energy
efficient
ones 














75,000
 6
Portland ME Energy Implement
the
first
phase
of
the
City's
energy
and
sustainability
program 










3,000,000
 17
Portland ME Public
Safety Expansion
of
wireless
INET
‐
provide
backup
for
our
public
safety
radio
system
and
expand
wireless
availability

within
the
City
to
provide
redundancy 












800,000
 4
Portland ME Public
Safety Police
Dept:
Computers
and
Technology
upgrades
and
replacement
 












100,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
Portland ME Public
Safety Fleet
replacement:

12
frontline
cruisers

2
SUV
supervisor
vehicles

1
Replacement
for
the
Animal
Control
van,
which
is
very
old

1
Replacement
for
the
Arrest
Van














500,000
 6
Portland ME Public
Safety Fire
Dept
‐
construct
improved
berthign
space
for
safe
access
and
egress
by
the
Fire
Boat
which
serves
the

public
safety
needs
of
the
mainland
and
Casco
Bay
Islands,
and
serves
as
an
integral
Homeland
Security

resource 










1,000,000
 7
Portland ME Schools Technology
upgrades
‐
implementa3on
of
technology
upgrades
in
all
schools,

computers
in
classrooms,
smart

boards,
etc.











1,000,000
 6
Portland ME Streets/Roads Neighborhood
street
and
sidewalk
projects
 










3,500,000
 16
Portland ME Water Combined
Sewer
Overflow
projects
(based
on
CSO
Master
Plan) 








20,000,000
 100
Bafle
Creek MI Airport New
Airport
electric
vault 












600,000
 25
Bafle
Creek MI Airport South
Airport
Rd.
extension 










1,500,000
 30
Bafle
Creek MI Airport Parallel
Runway
and
Taxiway
Construc3on 










1,500,000
 75
Bafle
Creek MI CDBG Mass
grading
project
at
Airport 










1,460,000
 20
Bafle
Creek MI CDBG Flood
Control
Channel
Improvements 












500,000
 40
Bafle
Creek MI CDBG Hamblin
Ave.
Parking
Facility
Improvements 












800,000
 50
Bafle
Creek MI CDBG Central
Business
District
Parking
Lot
Improvements
and
Rain
Gardens 












850,000
 60
Bafle
Creek MI Energy Water
Plant
Wind
Turbine
(1
unit) 










2,500,000
 10
Bafle
Creek MI Energy Wastewater
Wind
Turbines
(2
units) 










5,000,000
 20
Bafle
Creek MI Public
Safety Mobile
Incident
Command
Center 












400,000
 5
Bafle
Creek MI Public
Safety Police
Mobile
Data
Computers 












200,000
 5
Bafle
Creek MI Streets/Roads Local
Street
Rehabilita3on
Program‐‐7.5
miles 










4,200,000
 50
Bafle
Creek MI Streets/Roads Major
Street
Rehabilita3on
Program‐‐21
miles 










6,600,000
 50
Bafle
Creek MI Streets/Roads Downtown
Riverwalk
Improvements 










1,500,000
 65
Bafle
Creek MI Transit New
Full‐Sized
Hybrid
Bus 












550,000
 10
Bafle
Creek MI Transit Intermodal
Facility
Improvements 










1,125,000
 60
Bafle
Creek MI Water Water
Plant
Rehabilita3on 












960,000
 20
Bafle
Creek MI Water Water
meter
reading
replacement
program 










2,300,000
 25
Bafle
Creek MI Water Interceptor
Sewer
Rehabilita3on 








10,975,000
 30
Bafle
Creek MI Water Wastewater
Pump
Sta3on
Replacement 










3,000,000
 40
Bafle
Creek MI Water Sewer
Main
Rehabilita3on 










3,375,000
 50
Bafle
Creek MI Water Skyline
Rd./I‐94
Water
and
Sewer
Extension 










3,600,000
 50
Bafle
Creek MI Water Water
Main
Replacement 










8,270,000
 50
Bafle
Creek MI Water Wastewater
treatment
plant
rehabilita3on 










7,405,000
 60
Bingham
Farms MI Streets/Roads 
Fromm
Road
Reconstruc3on














230,000
 6.4
Bingham
Farms MI Streets/Roads 
Timber
Trail
Road
Reconstruc3on














245,000
 6.8
Bingham
Farms MI Streets/Roads 
Shagood
Road
Reconstruc3on
 












250,000
 6.9
Center
Line MI Streets/Roads Pavement
Patching
on
Various
Major
Streets 












300,000
 8.3
Center
Line MI Streets/Roads City
Facility
PArking
Lot
Rehab
and
replacement 












350,000
 9.7
Center
Line MI Streets/Roads Coolidge
Pavement
Patching,
Lawrence
to
Van
Dyke 












450,000
 12.5
Center
Line MI Streets/Roads Harding
Street
Pavement
Replacement
(2
Blocks) 












650,000
 18.1
Center
Line MI Water Open
Cut
Storm
Sewer
Repairs 














75,000
 2.1
Center
Line MI Water Sanitary
Seweer
manhole
Channel
&
Drop
Connec3on
Repairs 












115,000
 3.2
Center
Line MI Water Gate
Valve
&
Well
Repair
program 












150,000
 4.2
Center
Line MI Water Structural
repairs
to
Deteriorated
Sanitary
Sewers 












200,000
 5.6
Center
Line MI Water Weigand
Water
Main
Replacement 












215,000
 6
Center
Line MI Water Weingartz
Water
Main
Replacement 












215,000
 6
Center
Line MI Water Helen
Water
Main
Replacement 












325,000
 9
Center
Line MI Water Full
length
and
Secional
CIPP
Linings
to
Damaged
Storm
Sewers 












500,000
 13.9
Center
Line MI Water Clean
&
CCTV
Storm
Sewer
System,
Evaluate
for
Repairs,
Capacity
Analysis 












700,000
 19.4
Clawson MI Streets/Roads 
14
Mile
&
Guardian
Angels
Traffic
Signal
Replacement














125,000
 3.5
Clawson MI Streets/Roads 
14
Mile
&
Guardian
Angels
Traffic
Signal
Replacement














125,000
 3.5
Clawson MI Streets/Roads 
Crooks
Road
&
Elmwood
Traffic
Signal
Replacement
 












125,000
 3.5
Clawson MI Streets/Roads 
Rochester
Road
&
Goodale
Traffic
Signal
Replacement
 












125,000
 3.5
Clawson MI Streets/Roads 
14
Mile
&
Bellevue
Traffic
Signal
Replacement
 












175,000
 4.9
Clawson MI Streets/Roads 
14
Mile
&
Main
Street
Traffic
Signal
Replacement
 












175,000
 4.9
Clawson MI Streets/Roads Main
Street
&
Walper
Traffic
Signal
Replacement 












175,000
 4.9
Clawson MI Streets/Roads 
N.
Stephen
Reconstruc3on
‐
School
to
Dreon
 












180,000
 5
Clawson MI Streets/Roads 
Langley
‐
School
to
Dead
End
 












300,000
 8.3
Clawson MI Streets/Roads 
Gargantua
Reconstruc3on
‐
Nakota
to
Massoit
 












410,000
 11.4
Clawson MI Streets/Roads 
S.
Manitou
Reconstruc3on
‐
Nakota
to
Massoit
 












410,000
 11.4
Clawson MI Streets/Roads 
Selfridge
Reconstruc3on
‐
Elmwood
to
Phillips
 












450,000
 12.5
Clawson MI Streets/Roads 
Various
Streets
‐
Road
Patching
 












500,000
 13.9
Clawson MI Streets/Roads 
Key
West
Drive
Reconstruc3on
‐
Badder
to
E.
City
limit
 












820,000
 22.8
City State Program Project
Descrip3on Funding
Required Jobs
Clawson MI Streets/Roads 
Council
Reconstruc3on
‐
N.
Custer
to
N.
Main
Street
 












870,000
 24.2
Clawson MI Streets/Roads 
Grant
Reconstruc3on
‐
Wilson
to
Rochester
Road
 












910,000
 25.3
Clawson MI Streets/Roads 
Dreon
Reconstruc3on
‐
Kenilworth
to
N.
Stephen
 












940,000
 26.1
Clawson MI Streets/Roads 
Kenilworth
Reconstruc3on
‐
Elmwood
to
Dreon
 












950,000
 26.4
Clawson MI Streets/Roads 
School
Reconstruc3on
‐
Langley
to
N.
Bywood
 










1,100,000
 30.6
Clawson MI Streets/Roads 
N.
Selfridge
Reconstruc3on
‐
Elmsford
to
Maple
 










1,120,000
 31.1
Clawson MI Streets/Roads 
N.
Bywood
Reconstruc3on
‐
Park
Drive
to
Maple
 










1,200,000
 33.3
Clawson MI Streets/Roads 
Broadacre
Reconstruc3on
‐
N.
Crooks
to
N.
Bywood
 










1,550,000
 43.1
Clawson MI Streets/Roads 
Phillips
Reconstruc3on
‐
Bywood
to
Main
Street
 










1,550,000
 43.1
Clawson MI Streets/Roads 
Elmwood
Reconstruc3on
‐
Crooks
to
Rochester
Road
 










3,000,000
 83.3
Clawson MI Water 
Washington
Water
Main
Loop
‐
John
M
to
Phillips
 












130,000
 3.6
Clawson MI Water 
N.
Marias
Water
Main
Replacement

‐
Broadacre
to
Phillips
 












140,000
 3.9
Clawson MI Water 
N.
Custer
Water
Main
Replacement
‐
Council
to
Maple
 












160,000
 4.4
Clawson MI Water 
Bowers
Water
Main
Replacement

‐
Rochester
to
14
Mile
Road
 












230,000
 6.4
Clawson MI Water 
Fisher
Court
Water
Main
Replacement
‐
Main
Street
to
Boschma
 












390,000
 10.8
Clawson MI Water 
Bauman
Water
Main
Replacement
‐
Rochester
to
Bellevue
 












420,000
 11.7
Clawson MI Water 
W.
14
Mile
Water
Main
Replacement
‐
Bellevue
to
Rochester
Road
 












480,000
 13.3
Clawson MI Water 
S.
Main
Water
Main
Replacement
‐
Gardner
to
Bauman
 












510,000
 14.2
Clawson MI Water Broadacre
Water
Main
Replacement
‐
Main
Street
to
N.
Bywood 












610,000
 16.9
Clawson MI Water 
S.
Rochester
Water
Main
Replacement

‐
14
Mile
to
Bauman
 












670,000
 18.6
Clawson MI Water 
Maple
Water
Main
Replacement
‐
Langley
to
N.
Custer
 












800,000
 22.2
Clawson MI Water 
Line
or
Replace
Deteriorated
Sanitary
Sewers
 










7,000,000
 194.4
Dearborn MI Amtrak Dearborn
Amtrak
Sta3on
&
Plazorm
Reloca3on 










2,500,000
 30
Dearborn MI CDBG Containerized
Trash
collec3on 












300,000
 3
Dearborn MI CDBG Watermain
replacement
and
asphal
resurfacing
of
Yinger
Street
from
Donald
to
Warren
Avenue 










1,000,000
 10
Dearborn MI CDBG Dix
Avenue
Streetscape 










1,500,000
 15
Dearborn MI Energy Photovoltaic
Panels
for
Henry
Ford
Community
College 












500,000
 2
Dearborn MI Energy Hybrid
Vehicles
for
City
Fleet
(25
vehicles) 












625,000
 3
Dearborn MI Energy Green
Housing
Rehabilita3on
(30
homes) 










1,000,000
 10
Dearborn MI Energy LED
Downtown
Street
Light
Retrofit 










2,000,000
 10
Dearborn MI Energy East
Dearborn
On‐Site
Power
Genera3on 










3,000,000
 15
Dearborn MI Energy Wind
Turbines
for
Rouge
River
Gateway 










5,000,000
 25
Dearborn MI Energy East
Dearborn
Green
Zone
(Town
Center/City
Hall
Campus) 










6,000,000
 30
Dearborn MI Housing Window
Replacement 










1,050,405
 35
Dearborn MI Public
Safety Ballis3c
Armor
(vests)
80
vests
@
$500.00 














40,000

Dearborn MI Public
Safety IT
Specialist
(full‐3me) 














80,500

Dearborn MI Public
Safety Patrol
Rifles

5
@
$1,100.00 















5,500

Dearborn MI Public
Safety TASERS

5
@
$810.00 















4,050

Dearborn MI Public
Safety Training
Room
A/V
upgrade 














20,000

Dearborn MI Public
Safety Technology
upgrad‐digital
dicta3on
voice
recogni3on 












250,000
 0
Dearborn MI Public
Safety 45
Mobile
Data
Computers
‐
Police
Vehicles 












300,000
 5
Dearborn MI Streets/Roads Brewster
‐
Middlebury
to
Andover 












244,955

Dearborn MI Streets/Roads Elmwood
‐
Fordson
to
Cherry
Hill 












331,141

Dearborn MI Streets/Roads Elmwood
Ct.
‐
Fordson
to
Fordson 












118,928

Dearborn MI Streets/Roads Fort
Dearborn
‐
Cherry
Hill
to
Kensington 












268,552

Dearborn MI Streets/Roads Lapham
‐
Michigan
Avenue
to
Prospect 












207,900

Dearborn MI Streets/Roads Lincoln
Street
‐
Carlysle
to
Madison 












389,670

Dearborn MI Streets/Roads Lodge
Lane
‐
Telegraph
to
Outer
Drive 












551,100

Dearborn MI Streets/Roads Long
Meadow
‐
Eastham
to
Greenfield 












328,500

Dearborn MI Streets/Roads Marshall
‐
Telegraph
to
Outer
Drive 












359,800

Dearborn MI Streets/Roads McKinley
Street
‐
Carlysle
to
Madison 












393,145

Dearborn MI Streets/Roads Rockford
‐
Telegraph
to
Melborn 












232,450

Dearborn MI Streets/Roads Roosevelt
Street
‐
Carlysle
to
Madison 












400,830

Dearborn MI Streets/Roads Rosevere
‐
Marshall
to
Cherry
Hill 












104,280

Dearborn MI Streets/Roads Rowe
‐
Highland
to
Elmwood 












100,220

Dearborn MI Streets/Roads S.
Martha
‐
Marshall
to
Cherry
Hill 














75,000

Dearborn MI Streets/Roads S.
Melborn
‐
Fordson
to
Cherry
Hill 












255,000

Dearborn MI Streets/Roads S.
York
‐
Fordson
to
Cherry
Hill 












211,760

Dearborn MI Streets/Roads Sterling
Place
‐
Highland
to
Elmwood 














93,920

Dearborn MI Streets/Roads Waverly
‐
Fordson
to
Cherry
Hill 












343,440

Dearborn MI Streets/Roads Woodland
‐
Eastham
to
Middlebury 












279,000

Dearborn MI Transit Refurbish
Regional
Commuter
Rail
Cars
(12
cars) 










6,000,000
 30
Dearborn MI Transit Dearborn
Intermodal
Rail
Passenger
Sta3on
(14,000
s.f.) 








21,400,000
 107
Dearborn MI Water Barrie‐Warren
to
Morross 












275,000

Dearborn MI Water Elmwood
Ct.‐Fordson
to
Fordson 












120,000

Dearborn MI Water Elmwood‐Fordson
to
Cherry
Hill 












331,200

Dearborn MI Water Leonard‐Maple
to
Irving 












180,000

Dearborn MI Water Marshall‐Telegraph
to
Outer
Drive 












359,800

Dearborn MI Water Monroe‐Dartmouth
to
Madison 












420,000

Dearborn MI Water Moross‐Yinger
to
Chase 












350,000

Dearborn MI Water Morross‐Wyoming
to
Wisconsin 












157,500

Dearborn MI Water Rockford‐Telegraph
to
Melborn 












232,450

City State Program Project
Descrip3on Funding
Required Jobs
Dearborn MI Water Rosevere‐Marshall
to
Cherry
Hill 












111,750

Dearborn MI Water Rowe‐Highland
to
Elmwood 












107,400

Dearborn MI Water S.
Martha‐Marshall
to
Cherry
Hill 














75,000

Dearborn MI Water S.
Melborn‐Fordson
to
Cherry
Hill 












255,000

Dearborn MI Water S.
York‐Fordson
to
Cherry
Hill 












211,800

Dearborn MI Water Sterling
Place‐Highland
to
Elmwood 












100,650

Dearborn MI Water Waverly‐Fordson
to
Cherry
Hill 












343,500

Dearborn
Heights MI CDBG New
Recrea3on
Center 








13,500,000
 91
Dearborn
Heights MI Energy Street
Ligh3ng 












500,000
 10
Dearborn
Heights MI Energy DPW
Facility
Improvements 










1,000,000
 20
Dearborn
Heights MI Energy Build
Canfield
Recrea3on
Center 








25,000,000
 125
Dearborn
Heights MI Housing Local
Community
Centers 










1,000,000
 25
Dearborn
Heights MI Public
Safety City
Hall
Renova3ons 










2,500,000
 20
Dearborn
Heights MI Streets/Roads Major
Street
Rehabilita3on 










1,500,000
 20
Dearborn
Heights MI Streets/Roads Local
Street
Rehabilita3on 










6,250,000
 50
Dearborn
Heights MI Water River
Oaks
Stormwater
Pond
Restora3on 












750,000
 10
Dearborn
Heights MI Water 10
Miles
Sewer
Main
Replacement 










8,000,000
 50
Dearborn
Heights MI Water 10
Miles
Water
Main
Replacement 










9,500,000
 50
Dearborn
Heights MI Water CSO
Control
URT
Project 








11,000,000
 75
Dearborn
Heights MI Water CSO
Control
Lower
Rouge 








15,000,000
 100
Detroit MI Airport Airport
upgrades
and
acquisi3ons 






106,500,000
 50
Detroit MI CDBG Infec3ous
disease
outreach 












350,000
 2
Detroit MI CDBG Interven3on
programs 












250,000
 2
Detroit MI CDBG Perven3on
programs
dealing
with
nuitri3on
educa3on,
obesity
and
other
childhood
diseases 












400,000
 2
Detroit MI CDBG Technology
upgrades
‐
Public
health 










2,000,000
 3
Detroit MI CDBG Remove
40,000
dead
ash
and
sliver
maple
trees 










4,000,000
 5
Detroit MI CDBG Capital
projects
for
Parks
and
recrea3on 








32,300,000
 10
Detroit MI CDBG Reconstruc3on/resurfacing
of
150
miles
of
major
roadway
throught
the
city. 








75,000,000
 50
Detroit MI Energy Remote
meter
reading 










1,250,000
 2
Detroit MI Energy Installa3on
of
2
60
MVA
Turbine
Generators 








85,000,000
 3
Detroit MI Energy 24000V
to
4800vDistribu3on
Sys
Conversion 








15,450,000
 5
Detroit MI Energy Conversion
and
upgrading
of
mercury
vapor
series
fed
street
lights
to
sodium
vapor
mul3ple
street
lights 








88,000,000
 5
Detroit MI Energy Relay
Replacement
Program 










4,300,000
 5
Detroit MI Energy Traffic
Signal
Feed
Upgrades 










5,200,000
 5
Detroit MI Energy Upgrades
to
municipal
center
to
adopt
"green"
opera3onal
ini3a3ves 








45,000,000
 600
Detroit MI Streets/Roads Riopelle
Park,
open
space
improvements 












350,000
 4
Detroit MI Streets/Roads Pedestrian
bridge
over
M‐8,
paint
deck
patch 












400,000
 5
Detroit MI Streets/Roads HMA
crack
seal 












500,000
 6
Detroit MI Streets/Roads 3
railroad
bridges,
substructure
repair 












700,000
 7
Detroit MI Streets/Roads Capitol
Park,
open
space
improvements 












600,000
 7
Detroit MI Streets/Roads Removal
of
railroad
structure 












640,000
 7
Detroit MI Streets/Roads Construct
and
install
internally
illuminated
street
name
signes
at
25
loca3ons
in
the
downtown 












500,000
 10
Detroit MI Streets/Roads Install
new
pedestrain
crosswalks
in
the
downtown
area 












500,000
 10
Detroit MI Streets/Roads Detec3on
system
replacement,
100
sites 










1,000,000
 13
Detroit MI Streets/Roads Second,
Hamilton,
Woodward,
John
R,
Epoxy
Overlay 










1,400,000
 20
Detroit MI Streets/Roads Paradise
Valley,
Streetscape
and
open
space
improvements 










2,500,000
 22
Detroit MI Streets/Roads Vinewood
Universal
Crossover
‐
CN,
Reduce
railroad
conges3on
and
emissions
and
construct
universal
crossover 










2,500,000
 22
Detroit MI Streets/Roads Design
plaza
ramp
and
local
ramp
work 










1,270,000
 30
Detroit MI Streets/Roads I‐94,
ITS
Expansion 










4,430,000
 30
Detroit MI Streets/Roads Schaefer
Highway,
pump
sta3on 










1,260,000
 30
Detroit MI Streets/Roads 7
bridges
over
M‐39,
superstructure
repair 










1,200,000
 32
Detroit MI Streets/Roads Milwaukee
pump
sta3on 










1,350,000
 32
Detroit MI Streets/Roads Seldon
pump
sta3on 










1,350,000
 32
Detroit MI Streets/Roads Woodingham
pump
sta3on
 










1,350,000
 32
Detroit MI Streets/Roads Dequindre
Trail,
Non‐motorized
greenway 










1,000,000
 35
Detroit MI Streets/Roads Jefferson
outlet,
pump
sta3on 










2,200,000
 35
Detroit MI Streets/Roads 1
bridge
over
I‐94,
deck
replacement 










1,500,000
 40
Detroit MI Streets/Roads 45
MPH
Crossover,
reduce
railroad
conges3on
and
emissions,
construct
crossover












2,700,000
 40
Detroit MI Streets/Roads Joseph
Campau
over
M‐8,
paint,
deck
patch 










2,100,000
 42
Detroit MI Streets/Roads 2
bridges
over
M‐39,
1
superstructure
repair
and
1
deck
replacement 










3,000,000
 45
Detroit MI Streets/Roads 3
bridges
over
I‐94,
substructure
repair
and
repain3ng 










3,000,000
 45
Detroit MI Streets/Roads Goddard
over
M‐8,
deck
replacement 










2,500,000
 45
Detroit MI Streets/Roads Track
upgrade,
reduce
railroad
conges3on
and
emissions;
replace
3es
and
rail
primarliy
on
Main
2 










3,000,000
 45
Detroit MI Streets/Roads 3
bridges
over
I‐96,
deck
replacement 










3,892,000
 50
Detroit MI Streets/Roads 5
bridges
over
M‐39,
CPM 










4,000,000
 50
Detroit MI Streets/Roads Improve
traffic
safety
by
retrofiqng
pedestrian
traffic
signals
with
countdown
3mes
and
push
bufons
at
100

intersec3ons 










2,000,000
 50
Detroit MI Streets/Roads Reconstruc3on/Rehabilita3on
of
11
vehicular
and
pedestrian
bridges
throught
Detroit. 








17,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Detroit MI Streets/Roads Crossover
at
West
Detroit,
reduce
railroad
conges3on
and
emissions
and
construct
universal
crossover 










4,500,000
 55
Detroit MI Streets/Roads Lower
Woodward
Cross
Streets,
streetscape 










3,300,000
 60
Detroit MI Streets/Roads Atwater,
Orleans,
Riopelle,
riverfront
development
and
infrastructure 










5,000,000
 70
Detroit MI Streets/Roads 4
bridges
over
M‐39,
4
deck
replacements 










7,000,000
 80
Detroit MI Streets/Roads Device
upgrade 










7,000,000
 80
Detroit MI Streets/Roads DMS
Replacement
‐
35
signs 










7,000,000
 80
Detroit MI Streets/Roads Dock
and
terminal
project,
addi3onal
phases 










8,783,093
 95
Detroit MI Streets/Roads 5
bridges
over
I‐94,
3
deck
replacements
and
2
deck
patch
 










8,500,000
 100
Detroit MI Streets/Roads 5
bridges
over
M‐39,
3
super
replacements
and
2
deck
replacements 








10,000,000
 125
Detroit MI Streets/Roads US‐24
to
I‐275,
bridge
CPM 








10,000,000
 125
Detroit MI Streets/Roads 7
bridges
over
I‐96,
deck
replacement 








12,412,000
 190
Detroit MI Streets/Roads 6
bridges
over
M‐39,
1
super
replacement
and
5
deck
replacements 








14,800,000
 200
Detroit MI Streets/Roads Construct
Rosa
Parks
Integrated
Campus









11,800,000
 220
Detroit MI Streets/Roads Sanders,
Pleasant
and
NS
RR,
3
bridge
replacements 








18,000,000
 220
Detroit MI Streets/Roads M‐85
Sibley
to
Goddard,
reconstruct 








57,250,000
 600
Detroit MI Transit Capital
Assets 








13,000,000
 2
Detroit MI Transit Bus
stop
improvements 










3,000,000
 5
Detroit MI Transit Communica3ons
equipment 








39,000,000
 5
Detroit MI Transit Facility
improvements
and
upgrades 








61,000,000
 25
Detroit MI Transit New
Bus
Acquisi3ons 








15,000,000
 50
Detroit MI Transit Ann
Arbor
to
Detroit,
passenger
rail,
rail
coach
and
cab
car
purchase
and
rehabilita3on
for
passenger
service 










6,000,000
 80
Detroit MI Transit Construct
administra3on
facility
‐
Rosa
Parks
Transporta3on
Center 








18,000,000
 220
Detroit MI Water Upgrades
to
Upper
Rouge
Tunnel
CSO
Control
Project 






270,600,000
 1200
Dexter MI Energy Conversion
of
Main
Street
streetlights
to
LED 














80,000
 6
Dexter MI Streets/Roads Rehabilita3on
of
Dexter‐Ann
Arbor
Road
from
Meadowview
to
Main
Street 










1,000,000
 7
Dexter MI Streets/Roads Widen
and
reconstruct
Jeffords
and
Forest 










1,000,000
 7
Dexter MI Streets/Roads Reconstruc3on
of
Central
Street 










2,000,000
 13
Dexter MI Streets/Roads Installa3on
of
roundabout
at
Main
and
Dexter‐Chelsea 








10,000,000
 36
Dexter MI Water Rehabilitate
sanitary
sewer
system 










1,000,000
 7
Dexter MI Water Construc3on
of
emergency
storage 










1,300,000
 8
Dexter MI Water Fibh
Well
Development
and
Transmission
Mains 










1,300,000
 8
Dexter MI Water Upgrade
exis3ng
4
inch
cast
iron
water
mains
to
8
inch
duc3le
iron
water
mains 










2,500,000
 16
Dexter MI Water Construc3on
of
400,000
gallon
equaliza3on
basin 










2,545,000
 17
Eastpointe MI CDBG Library
Parking
Lot
Reconstruc3on 












550,000
 15.3
Eastpointe MI Streets/Roads 9
Mile
Road
Joint
Sealing
‐
Kelly
Road
to
West
City
Limits 












125,000
 3.5
Eastpointe MI Streets/Roads Juliana
Avenue
Reconstruc3on
‐
David
to
Kelly 












215,000
 6
Eastpointe MI Streets/Roads SB
Kelly
Road
Reconstruc3on
‐
Norton
to
9
Mile 












300,000
 8.3
Eastpointe MI Streets/Roads SB
Kelly
Road
Resurfacing
‐
Stephens
to
Norton 












345,000
 9.6
Eastpointe MI Streets/Roads Hayes
Road
Resurfacing
‐
9
Mile
to
Stephens 












850,000
 23.6
Eastpointe MI Streets/Roads SB
Kelly
Road
Reconstruc3on
‐
Toepfer
to
8
Mile
Road 










1,200,000
 33.3
Eastpointe MI Water Cushing
Ave
Water
Main
Replacement
‐
9
Mile
to
Stephens 












400,000
 11.1
Eastpointe MI Water Wilmot
Water
Main
Replacement
‐
Stephens
to
10
Mile 












400,000
 11.1
Eastpointe MI Water Kelly
Road
and
8
Mile
Meter/PRV
Pit 












550,000
 15.3
Eastpointe MI Water Gra3ot
and
8
Mile
Meter/PRV
Pit 












600,000
 16.7
Eastpointe MI Water 10
Mile
Road
Water
Main
Replacement
‐
Gra3ot
to
Flower 












700,000
 19.4
Eastpointe MI Water Water
Reservior
Upgrades 










1,300,000
 36.1
Eastpointe MI Water Line
or
Replace
Deteriorated
Sanitary
Sewers 










5,500,000
 152.8
Flint MI Public
Safety Implement
a
improved
Safety
Signal
at
12th
St.
and
Ballenger
Hwy.

And
Miller
Road
and
Ballenger
Hwy.
 












170,000
 15
Flint MI Public
Safety Implement
and
construct
a
total
new
safety
design
intersec3on
at
two
City
of
Flint
street
intersec3ons.


Pasadena/Dupont
and
Pasadena/Freemont
loca3ons. 












855,000
 25
Flint MI Public
Safety Repair
the
"Main"
Street
Bridge
in
the
City
of
Flint.

Saginaw
Street
Bridge
as
part
of
the
Flint
River
Restora3on.













900,000
 30
Flint MI Public
Safety Repair
the
Kearsley
Park
Blvd
Motorized
Vehicle
Traffic
Bridge
that
crosses
over
Gilkey
Creek. 












900,000
 30
Flint MI Public
Safety Implement
the
newly
designed
traffic
route
for
the
en3re
City
of
Flint
Downtown
area.
Fourteen
(14)

intersec3ons
are
involved
in
the
redesign.
This
improvement
will
improve
pedestrian
and
vehicle
safety.
 










1,400,000
 35
Flint MI Public
Safety Repair
the
Robert
T.
Longway
Motorized
Vehicle
Bridge
that
crosses
over
Thread
Creek.

 










1,200,000
 35
Flint MI Public
Safety Repair
the
S.
Grand
Traverse
Motorized
Vehicle
Bridge
that
crosses
over
Thread
Creek.

 










1,300,000
 35
Flint MI Public
Safety Repair
the
South
Grand
Traverse
Motorized
Traffic
Bridge
that
crosses
over
Thread
Creek.
 










1,300,000
 35
Flint MI Public
Safety Repair
the
Fenton
Road
Motorized
Vehicle
Traffic
Bridge
that
crosses
over
Thread
Creek.

 










1,900,000
 40
Flint MI Public
Safety Repair
the
W.
Second
Street
Motorized
Vehicle
Bridge
that
crosses
over
Swartz
Creek. 










3,400,000
 60
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
W.
Second
St.
from
Grand
Traverse
to
Harrison
Rd.
 












300,000
 15
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
W.
Second
Street
from
Chase
St.
to
Grand
Traverse. 












400,000
 20
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
W.
Stewart
Ave
from
Clio
Road
to
Dupont
Street. 












400,000
 20
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"

Chevrolet
Ave.

From
Chevrolet
Bridge
past
Kefering
University
to

University
Ave.
 










1,100,000
 30
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"

Chevrolet
Connector
from
Hammerberg
Rd.
to
Chevrolet.

This
is
a

cri3cal
upgrade
to
improve
the
Kefering
Enterence
off
I‐69. 










1,200,000
 30
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
Clio
Road,
from
W.
Stewart
Ave.
to
Pierson
Road













800,000
 30
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
Glenwood
Ave.
from
Court
St.
to
Stevenson
St.
 












500,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
Lippencof
Blvd.
from
Burr
Blvd
to
Averill
St. 












900,000
 30
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
MLK‐W.
Pierson
Rd.to
Carpenter
Rd. 










1,300,000
 30
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
West
12th
Street
from
Hammerberg
to
Fenton
Road 












920,000
 30
Flint MI Streets/Roads The
City
of
Flint
and
Genesee
County
Planning
Commission
have
completed
engineering
plans
for
construc3on

of
the
Genesse
Valley
Trailway.

River
Bank
Park
to
City
Limits. 












600,000
 35
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
Industrial
St.
from
Stewart
to
Hamilton
Ave. 










2,100,000
 40
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
Iroquois
St.
from
Pasadena
to
Welch
Blvd. 










2,500,000
 40
Flint MI Streets/Roads Exci3ng
News!
The
City
of
Flint
and
Genesee
County
Planning
Commission
have
completed
engineering
plans

for
the
construc3on
of
The
Grand
Traverse
GreenWay.

 










1,300,000
 60
Flint MI Streets/Roads Paving
of
"Key
Infrastructure
Roadway"
Flint
River
to
Pierson
Road. 










6,300,000
 130
Flint MI Water
Flint MI Water Construct
and
fabricate
a
new
water
buster‐sta3on
at
Torrey
Road
in
the
City
of
Flint.

This
a
signifcant
priority

for
the
City.

This
is
necessary
to
insure
the
func3oning
at
a
General
Motors
manufacturing
facility
and
a
large

local
neighborhood
and
co 










2,000,000
 20
Flint MI Water Utah
Dam
removal
and
fabrca3on
and
construc3on
of
a
pedestrian
bridge. 










1,300,000
 35
Flint MI Water Update
the
City
of
Flint
Water
Plant
to
func3on
as
a
stand
alone
water
purifaca3on
and
distribu3on
plant
(Flint

River
the
water
source). 








25,000,000
 50
Flint MI Water Update
the
City
of
Flint
Water
Plant
to
func3on
as
a
stand
alone
water
purifaca3on
and
distribu3on
plant(Lake

Huron
water
source). 








15,000,000
 50
Flint MI Water Update
the
infrastructure
of
the
water
pumping
system
for
the
en3re
City
of
Flint
River
Bank
Park.

Include

habitate
restora3on
and
enhanced
fish
passage 










3,000,000
 50
Flint MI Water Hamilton
Dam
removal
and
rock
rapid
crea3on.

Fishery
restora3on
on
the
Flint
River.

Flood
protec3on

remaining.

Fabri
Dam
removal
and
rock
rapid
design.

Fish
passage
and
flood
protec3on
included. 










6,000,000
 75
Fraser MI Streets/Roads Mulvey
Road
Resurfacing‐
14
Mile
to
U3ca 












660,000
 19
Fraser MI Streets/Roads Asphalt
Road
Rehabilita3on‐
College
Blvd,
Caroline
St,
Callahan,
Leota
St,
Park
Ln,
Depot
Rd
and
various

loca3ons













750,000
 21
Fraser MI Streets/Roads Concrete
Road
Rehabilita3on‐
Various
Loca3ons 










5,000,000
 139
Fraser MI Water Rainbow
Water
Main‐
Eveningside
to
Slumber 












300,000
 9
Fraser MI Water 14
Mile
Water
Main
Replacement‐
Edgegrove
to
Garfield 












400,000
 12
Fraser MI Water 14
Mile
Water
Main
Replacement‐
Garfield
to
Fraser 












400,000
 12
Fraser MI Water Breezeway
Water
Main‐
Eveningside
to
Kelly 












410,000
 12
Fraser MI Water Calahan
Drain
Improvements 












400,000
 12
Fraser MI Water U3ca
Road
Water
Main‐
14
Mile
to
Groesbeck 










1,000,000
 28
Fraser MI Water Water
System
Reservoir 










2,500,000
 70
Fraser MI Water Hayes
Masonic
Sanitary
Interceptor‐
Beacon
Lane
to
15
Mile 








12,000,000
 334
Grand
Rapids MI CDBG Garfield
Sewer
Line
Connec3on 














45,000
 1
Grand
Rapids MI CDBG Farmer's
Market
Improvements 












100,000
 2
Grand
Rapids MI CDBG Ah‐Nab‐Awen
Renova3ons 












750,000
 10
Grand
Rapids MI CDBG Joe
Taylor
Park
Improvements
Park
expansion
and
development
in
conjunc3on
with
CSO
improvements. 












750,000
 10
Grand
Rapids MI CDBG Veteran's
Memorial
Park
Improvements 












750,000
 10
Grand
Rapids MI CDBG Garfield
Pool/Bath
House
Demoli3on 












915,000
 15
Grand
Rapids MI CDBG Various
Park
Loca3ons
Paving
Repairs 










1,000,000
 20
Grand
Rapids MI CDBG Fulton
Street
Farmers
Market
Expansion











3,000,000
 55
Grand
Rapids MI CDBG Community
Archives
and
Record
Center
(CARC)
Improvements 










5,441,400
 80
Grand
Rapids MI Energy Energy
conserva3on
Parking
‐
New
Equipment
and
Equipment
replacement 












250,000
 5
Grand
Rapids MI Energy City
Hall
Ligh3ng
Upgrade:
The
majority
of
the
exis3ng
ligh3ng
system
is
4
foot
fluorescent
lamp
system
with
a

T12
magne3c
ballast.

This
system
would
be
replaced
with
a
new
energy
efficient
T8
fixture
with
an
electronic

ballast
along
with
a
ligh3ng
 












400,000
 8
Grand
Rapids MI Energy Government
Buildings
‐
Energy
efficiency
improvements
and
retrofits 










2,000,000
 20
Grand
Rapids MI Energy City
Hall
Glazing
Replacement:
The
exis3ng
building
glazing
is
a
1/4
inch
single
pane
covered
by
window

screens
on
3
sides.

There
is
approximately
31,000
square
feet
of
glazing.

This
project
would
remove
the

exis3ng
glazing
and
window
screens
and
repl 










1,200,000
 22
Grand
Rapids MI Energy Energy
efficiency
‐
homes
retrofit 










3,000,000
 30
Grand
Rapids MI Energy Government
Buildings
‐
On
site
wind
power
projects 










2,500,000
 40
Grand
Rapids MI Energy Government
Buildings
‐
On
site
Solar
Panel
Projects 










5,000,000
 75
Grand
Rapids MI Public
Safety Parking
Security
Infrastructure
upgrade
and
Energy
conserva3on
 












120,000
 3
Grand
Rapids MI Public
Safety Improvements
to
the
Police
Department
firearms
range
 












500,000
 10
Grand
Rapids MI Public
Safety Neighborhood‐based
Crime
Preven3on
‐
Community
Development













650,000
 10
Grand
Rapids MI Public
Safety US‐131
Westside
Embankment
Upgrade
 










2,908,528
 60
Grand
Rapids MI Schools GRPS
North
Park
Elementary
‐
Renova3ons 












490,000
 10
Grand
Rapids MI Schools GRPS
Aberdeen
Elementary
‐
Renova3ons
 












705,000
 15
Grand
Rapids MI Schools GRPS
Blandford
‐
Replacement
of
Portables
with
Structure 










2,250,000
 45
Grand
Rapids MI Schools GRPS
C.A.
Frost
‐
Replacement
of
Portables
with
Structure 










2,250,000
 45
Grand
Rapids MI Schools Grand
Rapids
Public
Schools
(GRPS)
Stocking
Elementary
‐
Reconstruc3on 








10,700,000
 210
Grand
Rapids MI Schools GRPS
Congress
‐
Public
School
Major
Renova3on 








13,500,000
 225
Grand
Rapids MI Schools GRPS
City
High‐Middle
School
‐
Major
renova3on 








14,700,000
 250
City State Program Project
Descrip3on Funding
Required Jobs
Grand
Rapids MI Streets/Roads Parking
lot
construc3on
for
economic
development
and
infrastructure
development
‐
Diamond
Parking
lot















100,000
 2
Grand
Rapids MI Streets/Roads Paving
Repairs
‐
Removal
and
replacement
of
paved
lots
and
drives
that
are
beyond
maintenance
efforts.


Sec3ons
of
roadways
and
parking
lots
at
Riverside,
Richmond
and
Garfield
parks,
cemeteries
and
Fulton

Market.













100,000
 2
Grand
Rapids MI Streets/Roads Government
Center
Ramp,
Snow
Melt
Replacement















165,000
 3
Grand
Rapids MI Streets/Roads Plaster
Creek
Walkway
Retaining
Wall
near
Kroc
Center
‐
Construc3on
of
a
retaining
wall
and
walkway
on
City

property
adjacent
to
Plaster
Creek
which
will
allow
for
a
future
non‐motorized
trail
connec3on
into
the
City
of

Wyoming
and
eventually
to
Kent
Re 












140,000
 3
Grand
Rapids MI Streets/Roads Plaster
Creek
Trail
‐
Division
Avenue
‐
Grand
Rapids/Wyoming
Connector 












325,000
 5
Grand
Rapids MI Streets/Roads Wealthy
Street
Bridge
over
the
Grand
River


(Already
under
contract
to
MDOT) 










1,285,000
 15
Grand
Rapids MI Streets/Roads Riverside
West
Trail
‐
Ann
Street
to
North
Park
Street
 










1,500,000
 20
Grand
Rapids MI Streets/Roads Sidewalk
and
ADA
Ramp
Installa3on
along
Plainfield
Avenue
from
Fuller
Avenue
to
4
Mile
Road











1,000,000
 20
Grand
Rapids MI Streets/Roads Sidewalk
Ramps
at
Intersec3ons
&
Alleys











1,000,000
 20
Grand
Rapids MI Streets/Roads Concrete
street
repair
at
various
loca3ons
in
the
City 










1,000,000
 25
Grand
Rapids MI Streets/Roads Reconstruc3on
of
alleys
in
Haqe
Beverly
Project
Area











1,050,000
 25
Grand
Rapids MI Streets/Roads Reconstruc3on
of
Ionia
Avenue
from
Fulton
Street
to
Fountain
Street 










2,200,000
 25
Grand
Rapids MI Streets/Roads Reconstruc3on
of
Sheldon
Avenue
from
Highland
Street
to
Delaware
Street 












850,000
 25
Grand
Rapids MI Streets/Roads Parking
lot
construc3on
for
economic
development

and
infrastructure
development:

801
Ionia
parking
lot

(land
plus
construc3on)












2,800,000
 28
Grand
Rapids MI Streets/Roads Plaster
Creek
Trail
Phase
III
‐
Division
Avenue
to
Oxford
Street











2,500,000
 30
Grand
Rapids MI Streets/Roads Reconstruc3on
of
Leonard
Street
from
Remembrance
Road
to
Collindale
Avenue











2,500,000
 30
Grand
Rapids MI Streets/Roads Repairs
and
Sixth
Street
Bridge
over
the
Grand
River:
west
approach
replacement,
replace
exis3ng
bituminous

&
3mber
deck
with
a
glulam
deck
and
new
bit
surface,
electrical
work,
epairs
around
bearing
areas













1,250,000
 30
Grand
Rapids MI Streets/Roads Streetscape
Improvements
to
Madison
Avenue
and
Hall
Street 










2,390,573
 30
Grand
Rapids MI Streets/Roads Riveredges
Trail
‐
Canal
Street
Park
to
Ann
Street













4,100,000
 40
Grand
Rapids MI Streets/Roads Seward
Avenue
extension
–
Buferworth
Avenue
to
Fulton
Avenue
 










3,500,000
 45
Grand
Rapids MI Streets/Roads Sidewalk
and
ADA
Ramp
Installa3on
along
M‐11
(28th
Street
from
Division
Avenue
to
East
Paris
Avenue) 










3,000,000
 60
Grand
Rapids MI Streets/Roads Bridges
‐
Maintainance
&
Repairs 










5,000,000
 100
Grand
Rapids MI Streets/Roads Parking
lot
construc3on
for
economic
development,
infrastructure
development,
and
housing
‐
structure
LEED

cer3fied:

Gallery
at
Fulton
(construc3on)










12,000,000
 120
Grand
Rapids MI Streets/Roads Reconstruc3on
of
Miscellaneous
BRT
Route
Streets
Ransom
Avenue
(Fulton
to
Lyon)
Lafayefe
Avenue
(Fountain
to
Michigan)
Jefferson
Avenue
(Cherry
to
Fulton)
Division
Avenue
(Franklin
to
Wealthy)










11,890,669
 130
Grand
Rapids MI Streets/Roads Millennium
Park
‐
Wealthy
Street
Extension
Es3mate









15,000,000
 170
Grand
Rapids MI Streets/Roads Rotomill/resurface
Streets
–
Various
Loca3ons










22,500,000
 225
Grand
Rapids MI Water Line
(CIPP)
2000'
of
WWTP
Scrubber
pipeline 












180,000
 5
Grand
Rapids MI Water Replacement
of
Emergency
Generators
at
Various
Loca3ons 












200,000
 5
Grand
Rapids MI Water Contract
No.
10 










2,000,000
 10
Grand
Rapids MI Water Conversion
of
the
PERB
to
FEB
at
the
WWTP 












800,000
 10
Grand
Rapids MI Water Odor
Control
at
the
WWTP 










2,000,000
 10
Grand
Rapids MI Water Replacement
of
Process
Gate
Actuators
at
the
WWTP 










1,200,000
 15
Grand
Rapids MI Water Construc3on
of
Aggregate
Storage
Bins
at
Sewer
Maint
Building 












260,000
 20
Grand
Rapids MI Water East
Side
CSO
Cn#19 










2,750,000
 20
Grand
Rapids MI Water Improvements
to
the
Final
Effluent
Screw
Pumps
at
WWTP 












800,000
 20
Grand
Rapids MI Water Miscellaneous
Structural
Repairs
at
MARB 










1,135,000
 20
Grand
Rapids MI Water Replacement
of
Low
Lib
Valves
at
Lake
Michigan
Filtra3on
Plant 














75,000
 20
Grand
Rapids MI Water Replacement
of
the
Kingsbury
Lib
Sta3on
and
Forcemain 










2,100,000
 20
Grand
Rapids MI Water Structural
Strength
Improvements
at
Lake
Michigan
Filtra3on
Plant
‐
Phase
2 












290,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Grand
Rapids MI Water Alger
Reservoir
Improvements 










1,400,000
 25
Grand
Rapids MI Water Concrete
Restora3on
at
Lake
Michigan
Filtra3on
Plant
‐
Phase
3 












670,000
 25
Grand
Rapids MI Water Concrete
Restora3on,
Phase
2,
at
the
LMFP 












380,000
 25
Grand
Rapids MI Water Livingston
Power
Subyard
upgrades 












250,000
 25
Grand
Rapids MI Water Replacement
of
Pump
Motor
Starters
for
Franklin
pumps
1
and
3 












300,000
 25
Grand
Rapids MI Water Replacement
of
the
Bird
Avenue
Lib
Sta3on 










1,050,000
 25
Grand
Rapids MI Water Replacement
of
Valves
at
Monroe
tank 












100,000
 25
Grand
Rapids MI Water Sanitary
Sewer
and
Watermain
Replacement
in
Chatham
Street,
Jackson
Street,
Straight
Avenue
and
Na3onal

Avenue 










1,250,000
 25
Grand
Rapids MI Water Watermain
replacement
in
Hovey
from
lane
to
Fulton 














80,000
 25
Grand
Rapids MI Water Watermain
replacement
in
Lockridge
from
Diamond
to
east
end 












175,000
 25
Grand
Rapids MI Water Concrete
Restora3on
at
Lake
Michigan
Filtra3on
Plant
‐
Phase
4 










1,390,000
 30
Grand
Rapids MI Water East
Side
Combined
Sewer
Overflow
(CSO)
Cn#12A 










2,850,000
 30
Grand
Rapids MI Water East
Side
CSO
CN#12B 










3,500,000
 30
Grand
Rapids MI Water East
Side
CSO
Cn#20 










3,200,000
 30
Grand
Rapids MI Water Renova3ons
of
Filters
3,
5,
7
and
9
at
Lake
Michigan
Filtra3on
Plant 










2,200,000
 30
Grand
Rapids MI Water Replacement
of
High
Lib
#2
Discharge
Valves
at
Lake
Michigan
Filtra3on
Plant 












500,000
 30
Grand
Rapids MI Water Replacement
of
the
Bona
Vista
Lib
Sta3on 










2,200,000
 30
Grand
Rapids MI Water Saddleback
Trunk
Sewer
Cn
#4 










3,900,000
 30
Grand
Rapids MI Water Saddleback
Trunk
Sewer
Cn
#3 










2,800,000
 35
Grand
Rapids MI Water Saddleback
Trunk
Sewer
Cn
#1 










6,200,000
 45
Grand
Rapids MI Water East
Side
Combined
Sewer
Overflow 










4,375,000
 50
Grand
Rapids MI Water Knapp
Street/East
Beltline
Transmission
Watermain 










6,243,000
 50
Grand
Rapids MI Water Miscellaneous
Watermain
Valve
Repalcement 










1,000,000
 50
Grand
Rapids MI Water Replacement
of
watermain
in
Clearbrook,
Eastbrook
and
Chamberlain 










1,080,000
 50
Grand
Rapids MI Water Turner
Avenue/Bridge
Street
Sanitary
Sewer
Reloca3on 










3,900,000
 50
Grand
Rapids MI Water Watermain
replacement
in
Ann
from
Plainfield
to
Oakwood
and
Oakwood
from
Ann
to
Knapp 












260,000
 50
Grand
Rapids MI Water Watermain
replacement
in
Breton
north
of
Burton 












250,000
 50
Grand
Rapids MI Water Watermain
replacement
in
Grove
from
Plainfield
to
Taylor
and
in
Taylor
from
Grove
to
Plainfield 












540,000
 50
Grand
Rapids MI Water Watermain
replacement
in
Van
Auken
‐
Fuller
to
Kalamazoo 












520,000
 50
Grand
Rapids MI Water Watermain
replacement
in
Washtenaw
‐
Westlane
to
east
end 












410,000
 50
Grand
Rapids MI Water East
Side
CSO
Cn#14 








10,700,000
 55
Grand
Rapids MI Water 4
Mile
Road
Elevated
Storage
tank 










2,000,000
 100
Grosse
Pointe MI CDBG 400
Car
Municipal
Parking
Structure
‐
South
of
Kercheval
between
Notre
Dame
and
St.
Clair 










7,500,000
 208.3
Grosse
Pointe MI Streets/Roads Cadieux
Avenue
Resurfacing
‐
Kercheval
to
Jefferson 












450,000
 12.5
Grosse
Pointe MI Streets/Roads Waterloo
Avenue
Resurfacing
‐
St.
Clair
to
Fisher 












490,000
 13.6
Grosse
Pointe MI Water Water
Meter
Replacement
and
Installa3on
of
Automa3c
Reading
System 












450,000
 12.5
Grosse
Pointe MI Water Neff
Road
Pumping
Sta3on
Upgrades 












600,000
 16.7
Grosse
Pointe MI Water Line
or
Replace
Deteriorated
Sanitary
Sewers 










5,250,000
 145.8
Grosse
Pointe
Farms MI CDBG "Green"
deck
parking
structure.
Downtown
business
district
with
inadequate
parking
requires
parking
improvement
and
traffic
flow

improvement.

Proposed
58
space
single
story
parking
deck
with
"green"
technology
design
 










2,030,000
 56
Grosse
Pointe
Farms MI Energy Addi3on
of
a
single
level
parking
deck
with
"Green
roof"
design
criteria.



 










2,030,000
 56
Grosse
Pointe
Farms MI Public
Safety Purchase
of
new
department
issue
service
weapons
with
holsters,
ammuni3on,
accesories
and
training 














36,000
 1
Grosse
Pointe
Farms MI Streets/Roads Mack
Avenue
boulevard
turnaround
reconfigura3on.

Re‐configura3on
will
improve
traffic
flow
and
reduce

vehicular
and
pedestrian
incident 












475,000
 13
Grosse
Pointe
Farms MI Streets/Roads Kercheval
Ave.
streetscape
improvements.

Streetscape
improvements
include
improved
parking
incorpora3ng
"green"
technologies
in
design
to
improve

the
quality
of
stormwater
runoff,
energy
efficient
ligh3ng,
increased
green
space
and
landscape 










1,750,000
 48
Grosse
Pointe
Farms MI Water Sanitary
Sewer
rehabilita3on.
City
has
over
5
miles
of
aging
sanitary
sewer
located
within
residen3al
rear
yards,
making
access
and
repair

difficult
and
cost
prohibi3ve.

 










2,750,000
 76
Grosse
Pointe
Farms MI Water Sea‐wall
and
Ouzall
rehabilita3on.
City
is
bordered
by
2.7
miles
of
Lake
St.
Clair
and
has
an
aging
concrete
sea‐wall
with
32
stormwater
ouzalls. 








17,000,000
 470
Grosse
Pointe
Woods MI Streets/Roads Morningside
Road
Resurfacing‐
Renaud
to
Lochmoor 












250,000
 7
Grosse
Pointe
Woods MI Streets/Roads Crescent
Lane
Reconstruc3on 












300,000
 9
Grosse
Pointe
Woods MI Streets/Roads Hun3ngton
Reconstruc3on‐
Mack
to
Holiday 












310,000
 9
Grosse
Pointe
Woods MI Streets/Roads Wedgewood/
Maple
Lane
Reconstruc3on 












310,000
 9
Grosse
Pointe
Woods MI Streets/Roads Severn
Reconstruc3on‐
Mack
to
Bramcaster 












350,000
 10
Grosse
Pointe
Woods MI Streets/Roads Broadstone
Reconstruc3on‐
Mack
to
West
City
Limit 












450,000
 13
Grosse
Pointe
Woods MI Streets/Roads Country
Club
Reconstruc3on‐
Mack
to
West
City
Limit 












450,000
 13
Grosse
Pointe
Woods MI Streets/Roads Lancaster
Reconstruc3on‐
Mack
to
West
City
Limit 












450,000
 13
Grosse
Pointe
Woods MI Streets/Roads Oxford
Reconstruc3on‐
Mack
to
Holiday 












450,000
 13
Grosse
Pointe
Woods MI Streets/Roads Oxford
Reconstruc3on‐
Mack
to
West
City
Limit 












500,000
 14
Grosse
Pointe
Woods MI Streets/Roads Anita
Reconstruc3on‐
Mack
to
Charlevoix 












550,000
 16
Grosse
Pointe
Woods MI Streets/Roads North
Oxford
Reconstruc3on‐
Fairway
to
Morningside 












600,000
 17
Grosse
Pointe
Woods MI Streets/Roads Sunningdale
Reconstruc3on‐
Fairway
to
East
City
Limit 












700,000
 20
Grosse
Pointe
Woods MI Streets/Roads Marter
Road
Resurfacing‐Vernier
Road
to
Parkway 












750,000
 21
Grosse
Pointe
Woods MI Streets/Roads Vernier
Road
Resurfacing‐
Charlevoix
to
Fairway 












850,000
 24
Grosse
Pointe
Woods MI Streets/Roads Allard
Reconstruc3on‐
Mack
to
West
City
Limit 










1,100,000
 31
Grosse
Pointe
Woods MI Streets/Roads South
Renaud
Reconstruc3on‐
Mack
to
North
Renaud 










1,150,000
 32
Grosse
Pointe
Woods MI Streets/Roads Stanhope
Reconstruc3on‐
Mack
to
West
City
Limit 










1,300,000
 37
Grosse
Pointe
Woods MI Water Bournemouth
Water
Main
Replacement‐
Mack
to
Leslie 












360,000
 10
Grosse
Pointe
Woods MI Water Hampton
Water
Main
Replacement‐
Wedgewood
to
East
City
Limit 












350,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Grosse
Pointe
Woods MI Water Lancaster
Water
Main
Replacement‐
Mack
to
West
City
Limit 












350,000
 10
Grosse
Pointe
Woods MI Water Newcastle
Water
Main
Replacement‐
Mack
to
West
City
Limit 












335,000
 10
Grosse
Pointe
Woods MI Water Ridgemont
Water
Main
Replacement‐
Mack
to
West
City
Limit 












350,000
 10
Grosse
Pointe
Woods MI Water Hollywood
Water
Main
Replacement‐
Goethe
to
Marter 












365,000
 11
Grosse
Pointe
Woods MI Water Lochmoor
Water
Main
Replacement‐
Wedgewood
to
East
City
Limit 












500,000
 14
Grosse
Pointe
Woods MI Water Severn
Water
Main
Replacement‐
Mack
to
West
City
Limit 












500,000
 14
Grosse
Pointe
Woods MI Water Water
Main
Loops‐
Various
Loca3ons 












500,000
 14
Grosse
Pointe
Woods MI Water Sunningdale
Water
Main
Replacement‐
Fairway
to
East
City
Limit 












520,000
 15
Grosse
Pointe
Woods MI Water Anita
Water
Main
Replacement‐
Mack
to
Marter 












560,000
 16
Grosse
Pointe
Woods MI Water Allard
Water
Main
Replacement‐
Mack
to
West
City
Limit 












620,000
 18
Grosse
Pointe
Woods MI Water Brys
Drive
Water
Main
Replacement‐
Mack
to
Marter 












640,000
 18
Grosse
Pointe
Woods MI Water Fairholme
Water
Main
Replacement‐
Mack
to
Fairford 












820,000
 23
Grosse
Pointe
Woods MI Water South
Renaud
Water
Main
Replacement‐
Mack
to
North
Renaud 












900,000
 25
Grosse
Pointe
Woods MI Water Water
System
Reservoir 










2,000,000
 56
Grosse
Pointe
Woods MI Water Line
or
Replace
Structurally
Deficient
Sanitary/Combined
Sewers 










8,000,000
 223
Jackson MI CDBG Rent
to
own
home
construc3on
20
homes 










2,400,000

Jackson MI CDBG Dangerous
Building
Demoli3on 










1,000,000
 50
Jackson MI CDBG Water
Main
Replacement 












500,000
 50
Jackson MI CDBG Local
Street
Reconstruc3on 










1,000,000
 100
Jackson MI Public
Safety Replacement
of
40‐year
old
Police
Department
radio
system 










1,000,000

Jackson MI Streets/Roads Neighborhood
Street
Resurfacing 










1,000,000
 20
Jackson MI Streets/Roads Ganson
Street
Reconstruc3on 












373,000
 30
Jackson MI Streets/Roads Mechanic
Street
Bridge
Replacement 










1,226,830
 40
Jackson MI Streets/Roads Arts
Walk‐Riverwalk
Trail 










1,723,997
 50
Jackson MI Streets/Roads Local
Street
Reconstruc3on
NonCDBG 










1,000,000
 100
Jackson MI Transit Intermodal
Transporta3on
Facility
Preserva3on 










1,500,000
 75
Jackson MI Water Water
Main
Replacement
Brown
Street 












410,000
 30
Jackson MI Water Water
Main
Replacement
Dwight
Street 












373,000
 30
Jackson MI Water Water
Main
replacement‐Lewis
Glick
Highway 












523,000
 30
Kalamazoo MI CDBG Remarcite
Kik
Pool:

New
plaster
in
en3re
pool,
repair
and
replace
3les
in
lane
line,
feather
new
plaster
into

gufer. 














77,000
 10
Kalamazoo MI CDBG Renova3on
of
por3ons
of
cemetery
walls
which
have
deteriorated
due
to
age
and
storms. 












100,000
 15
Kalamazoo MI CDBG Ianelli
Historical
Fountain
Repairs
and
Restora3on. 












250,000
 30
Kalamazoo MI CDBG Sidewalk
Replacement
‐
N.
Park
&
N.
Westnedge
(4
miles
of
sidewalk). 












562,000
 30
Kalamazoo MI CDBG Burr
Oak
Court
Street
&
Streetscape
Improvements. 














96,000
 35
Kalamazoo MI CDBG Improvements
to
Soisson/Rapzez/Clason
Field
‐
New
scoreboard,
PA
System,
and
Restroom
Improvements. 












128,100
 35
Kalamazoo MI CDBG Business
Loop
I‐94
‐
Business
Loop
Gateway
Inprovements,
Phase
I. 












610,000
 40
Kalamazoo MI CDBG N.
Park
and
N.
Westnedge
Streetscape
Improvements 












502,000
 40
Kalamazoo MI CDBG Stuart/Fairmount
Community
Center 












500,000
 40
Kalamazoo MI CDBG Crane
Park
‐
Redevelopment
of
park,
demoli3on,
ADA
accessibility
improvements,
parking
improvements
&

landscaping. 












700,000
 50
Kalamazoo MI CDBG Farrell
Park
‐
Redevelopment
of
park,
demoli3on,
ADA
accessibility
improvements,
playground
equipment,

restroom/shelter,
landscaping
&
park
furnishings. 












500,000
 50
Kalamazoo MI CDBG Kalamazoo
Farmers
Market
‐
New
roof
structure,
ADA
accessibility
improvements,
parking
lot
improvements,
&

streetscape. 












500,000
 50
Kalamazoo MI CDBG La
Crone
Park
‐
Redevelopment
of
park,
demoli3on,
ADA
accessibility
improvements,
playground
equipment,

restroom/shelter,
landscaping
&
park
furnishings. 












900,000
 50
Kalamazoo MI CDBG Parkview
Ave.
‐
Non‐motorized
pathway
and
bridge
at
Cherry
Creek. 












400,000
 50
Kalamazoo MI CDBG Woods
Lake
‐
Redevelopment
of
park,
demoli3on,
walkways,
ADA
accessibility,
restroom/shelter,
playland,

landscaping
&
park
furnishings. 












800,000
 50
Kalamazoo MI CDBG Citywide
ADA
Sidewalk
Ramp
Improvements. 










3,000,000
 75
Kalamazoo MI CDBG City
Hall
Improvements
‐
Roof
replacement,
security
system
installa3on
‐
Upgrade
deteriorated
Budget
&
Acct.

facili3es
and
Treasury
Dept.

ADA
Upgrade.

Upgrade
City
Centrex
Phone
System. 












570,000
 90
Kalamazoo MI Energy Bronson
Park
Improvements
‐
Install
17
above
ground
pedestals
with
electric
receptacles
and
3mers. 














35,000
 5
Kalamazoo MI Energy Replace
one
100
ton
chiller
at
Public
Safety
Headquarters
that
is
well
past
its
life
cycle. 












130,000
 10
Kalamazoo MI Energy City
Hall
‐
Replace
storm
windows
with
energy
efficient
units. 












300,000
 25
Kalamazoo MI Energy Energy
efficient
ligh3ng
renova3ons
for
City
Hall
and
other
City
Buildings. 












200,000
 25
Kalamazoo MI Energy Traffic
Signal
Upgrades
‐
Upgrade
10
traffic
signalized
intersec3ons.

Energy
efficiency
project
to
save
80%
in

signal
energy
consump3on/costs
and
reduce
air
pollutant
emissions. 










2,000,000
 40
Kalamazoo MI Energy Secondary
Process
Improvements
‐
Enhanced
Biological
Phosphorus
Removal
System
and
fine
bubble
aera3on

system.

Significant
energy
savings
of
$500,000/yr. 










8,000,000
 300
Kalamazoo MI Energy 100
Hybrid
vehicles
for
City
Fleet. 










3,000,000
 1000
Kalamazoo MI Public
Safety Public
Safety
School
Resource
officers. 












500,000
 5
Kalamazoo MI Public
Safety Replace
Emergency
Warning
System
throughout
the
City. 












150,000
 15
Kalamazoo MI Public
Safety Upgrade
in‐car
video
recording
system
to
digital
system. 












500,000
 25
Kalamazoo MI Public
Safety Demoli3on
of
Public
Sta3on
#4
on
Rose
Street
to
green
space
and
demoli3on
of
Cedar
Street
Training
Center. 












550,000
 40
Kalamazoo MI Public
Safety Firearms
Range
at
Public
Safety
Training
Complex. 










5,000,000
 100
Kalamazoo MI Streets/Roads Paving
of
cemetery
roads. 












100,000
 20
Kalamazoo MI Streets/Roads Water
Street
(Pitcher
to
Kalamazoo)
‐
Mill
and
resurface 














51,000
 20
Kalamazoo MI Streets/Roads Cork
Street
(Burdick
to
W
of
Lovers
Lane)
‐
Mill
and
resurface 












315,000
 35
Kalamazoo MI Streets/Roads Cork
Street
(Westnedge
to
Burdick
)
‐
Mill
and
resurface. 












300,000
 35
Kalamazoo MI Streets/Roads Davis
Street
(Wheaton
to
Lovell
Street)
‐
Mill
and
resurface. 












252,000
 35
Kalamazoo MI Streets/Roads Edwards
Street
conversion
to
two‐way. 












218,000
 35
Kalamazoo MI Streets/Roads Lovers
Lane
(Cork
to
Royce)
‐
Mill
and
resurface. 












260,000
 35
City State Program Project
Descrip3on Funding
Required Jobs
Kalamazoo MI Streets/Roads March
Street
(Miller
to
Stockbridge)
‐
Mill
and
resurface. 












315,000
 35
Kalamazoo MI Streets/Roads Reed
Street
(Burdick
to
Portage
Street)
‐
Mill
and
resurface. 












265,000
 35
Kalamazoo MI Streets/Roads S.
Burdick
(Cork
to
Crescent
Drive)
‐
Mill
and
resurface. 












278,000
 35
Kalamazoo MI Streets/Roads Scafered
Site
Paving:

Milling
and
reconstruc3on
of
intersec3ons
and
small
sec3ons
of
streets. 












300,000
 35
Kalamazoo MI Streets/Roads Placement
of
sidewalk
in
areas
where
sidewalk
is
deficient 












240,000
 40
Kalamazoo MI Streets/Roads Arboretum
Parkway/Solon/Howard

Intersec3on
Improvements
(2
roundabouts). 










1,400,000
 50
Kalamazoo MI Streets/Roads Parking
system
infrastructure
improvements. 












580,000
 50
Kalamazoo MI Streets/Roads Intersec3on
Improvements
at
Parkview
Avenue
and
Oakland
Drive
‐
Widen
to
improve
capacity
and
safety. 










1,300,000
 60
Kalamazoo MI Streets/Roads Milling
and
reconstruc3on
of
local
streets
(Phase
I). 










2,000,000
 100
Kalamazoo MI Streets/Roads Milling
and
reconstruc3on
of
local
streets
(Phase
II). 










2,000,000
 100
Kalamazoo MI Streets/Roads Portage
Street
Streetscape,
Phase
1. 










3,340,000
 100
Kalamazoo MI Transit Acquire
and
install
an
integrated,
comprehensive
management/customer
service
automa3c
vehicle
locator

(AVL)
system. 










2,700,000
 20
Kalamazoo MI Transit Construct
60'
x
300'
concrete
and
steel
passenger
canopy
over
the
AMTRAK
rail
plazorm
at
the
Kalamazoo

Transporta3on
Center. 










4,000,000
 50
Kalamazoo MI Transit Facility
expansion
of
administra3ve
office
area
as
part
of
transi3on
of
Kalamazoo
Metro
Transit
from
a
city

department
to
the
governance
of
a
county‐wide
transit
authority. 










2,200,000
 50
Kalamazoo MI Water New
Process
Analyzers
for
Phosphorus
levels. 














50,000
 10
Kalamazoo MI Water Replacement
of
old
and
worn
pump
and
motors
that
can
not
be
repaired. 














70,000
 10
Kalamazoo MI Water Computer
hardware
and
sobware
for
water
and
wastewater
support
staff. 












130,000
 15
Kalamazoo MI Water Design
and
construct
a
sewer
from
the
Ter3ary
Mudwell
into
the
Recycle
Pump
Sta3on. 














75,000
 15
Kalamazoo MI Water Replace
the
remaining
Distributed
Control
Units
(DCU
2000s)
with
the
updated
DCU
3200s
and
upgrade

conductor
sobware
to
most
recent
revision. 












150,000
 20
Kalamazoo MI Water Perform
well
drilling/installa3ons,
development,
tes3ng,
well
pump
and
motor
installa3ons. 












300,000
 25
Kalamazoo MI Water Public
Safety
Sewer
Extension
‐
Nazareth
Road
Sewer. 












150,000
 25
Kalamazoo MI Water Update
deteriorated
instrumenta3on,
variable
frequency
drives,
actuators,
controls
and
electrical
equipment

at
the
Water
Reclama3on
Plant,
as
well
as
upgrade
to
telemetry
to
Lib
Sta3ons. 












320,000
 25
Kalamazoo MI Water Install
new
ter3ary
screw
pump
with
the
open
design
in
place
of
exis3ng. 












500,000
 30
Kalamazoo MI Water Valve
Improvement
‐
Annual
water
valve
exercise
and
replacement
program. 












210,000
 30
Kalamazoo MI Water Water
Meter
Improvement
‐
Annual
meter
capital
replacement
program. 












249,000
 30
Kalamazoo MI Water Water
Resource
New
and
Replacement
Wells:

Replace
low
producing
wells. 












445,000
 30
Kalamazoo MI Water Pain3ng
of
exterior
of
Mt.
Olivet,
Dartmouth,
and
Edgemoor
water
storage
tanks. 












920,000
 40
Kalamazoo MI Water New
and
replacement
hydrants. 












260,000
 45
Kalamazoo MI Water Replace
lead
water
services. 












223,000
 45
Kalamazoo MI Water Replace
the
three
exis3ng
bar
screens
in
the
Raw
Pump
Building. 












773,000
 50
Kalamazoo MI Water Replacement
of
deteriorated
equipment
and
facili3es
at
Water
Reclama3on
Plant,
including
Raw
Sewage

Pumps,
Site
Heat
loop
system
and
other
major
equipment. 










1,000,000
 50
Kalamazoo MI Water Upgrade
exis3ng
lib
sta3ons
including
pump
replacement
and
repairs,
standby
generators,
maintaining

approaches,
and
building
repairs.

Also,
upgrading
Virginia
Avenue
and
Burke
Court
ejector
sta3on. 












515,000
 50
Kalamazoo MI Water Arcadia
Trunk
Sanitary
Relief
Sewer
‐
Ransom
Street. 










2,400,000
 75
Kalamazoo MI Water New
and
replacement
sewers
as
well
as
the
lining
of
sewers
prone
to
I
&
I. 










1,425,000
 100
Kalamazoo MI Water Water
Pumping
Sta3on
Improvements
and
replacement
of
building
sta3on
structures
and
equipment. 












900,000
 100
Kalamazoo MI Water New
&
replacement
Water
Main
as
a
result
of
Public
Works
projects
or
substandard
main
due
to
size,

condi3on. 










2,000,000
 150
Kalamazoo MI Water Replacement
of
Water
Pumping
Sta3on
#8. 










3,500,000
 300
Keego
Harbor MI Streets/Roads 
Andre
Road
Reconstruc3on
‐
Kendrick
Street
to
End
















28,000
 1
Keego
Harbor MI Streets/Roads 
Atlas
Road
Reconstruc3on
‐
Kendrick
Street
to
Brock
Street
















13,000
 1
Keego
Harbor MI Streets/Roads 
Bulwer
St
Reconstruc3on
‐
Willow
Beach
Ave
to
End
 














24,000
 1
Keego
Harbor MI Streets/Roads 
Elam
Ct
Reconstruc3on
‐
Cass
Lake
Road
to
Pine
Lake
Avenue
 














34,000
 1
Keego
Harbor MI Streets/Roads 
Ofer
Ave
Reconstruc3on
‐
Cass
Lake
Road
to
City
Limits
 














11,000
 1
Keego
Harbor MI Streets/Roads 
Virginia
Ct
Reconstruc3on
‐
Kendall
Road
to
Hester
Court
 














18,000
 1
Keego
Harbor MI Streets/Roads 
Beachland
Blvd
Reconstruc3on
‐
Cass
Lake
Road
to
end
 














68,000
 2
Keego
Harbor MI Streets/Roads 
Brock
St
Reconstruc3on
‐
Kendrick
to
Atlas
 














63,000
 2
Keego
Harbor MI Streets/Roads 
Cass
Lake
Ave
Reconstruc3on
‐
Willow
Beach
Ave
to
Cass
Lake
Road
 














73,000
 2
Keego
Harbor MI Streets/Roads 
Cordell
St
Reconstruc3on
‐
Beechmont
to
Beechcrob
 














61,000
 2
Keego
Harbor MI Streets/Roads 
Nagle
Ct
Reconstruc3on
‐
Pine
Lake
Avenue
to
Hessler
Court
 














51,000
 2
Keego
Harbor MI Streets/Roads 
Norcof
St
Reconstruc3on
‐
Cass
Lake
Road
to
Cass
Lake
Front
 














72,000
 2
Keego
Harbor MI Streets/Roads 
Stout
St
Reconstruc3on
‐
Beland
to
Orchard
Lake
Road
 














54,000
 2
Keego
Harbor MI Streets/Roads 
Kessler
Dr
Reconstruc3on
‐
Cass
Lake
Road
to
City
Limits
 














88,000
 3
Keego
Harbor MI Streets/Roads 
Knowlson
St
Reconstruc3on
‐Beechmont
Street
to
City
Limits
 












108,000
 3
Keego
Harbor MI Streets/Roads 
Millwall
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Rycrob
 












107,000
 3
Keego
Harbor MI Streets/Roads 
Moss
Ave
Reconstruc3on
‐
Cass
Lake
Front
to
Sylvan
Glenn
 












102,000
 3
Keego
Harbor MI Streets/Roads 
Park
Circle
Reconstruc3on
‐
Willow
Beach
Ave
S
to
Willow
Beach
Ave
N
 














92,000
 3
Keego
Harbor MI Streets/Roads 
Stennef
St
Reconstruc3on
‐
Beechmont
to
End
 














98,000
 3
Keego
Harbor MI Streets/Roads 
Varjo
Ct
Reconstruc3on
‐
Orchard
Lake
Road
to
End
 














98,000
 3
Keego
Harbor MI Streets/Roads 
Wall
St
Reconstruc3on
‐
Beechmont
Street
to
Maddy
Lane
 














86,000
 3
Keego
Harbor MI Streets/Roads 
Beland
St
Reconstruc3on
‐
Cass
Lake
Road
to
Maddy
Lane
 












131,000
 4
Keego
Harbor MI Streets/Roads 
Glenbroke
Ave
Reconstruc3on
‐
Cass
Lake
Front
to
Sylvan
Glenn
 












118,000
 4
Keego
Harbor MI Streets/Roads 
Hensman
Ave
Reconstruc3on
‐
Cass
Lake
Road
to
Rus3c
Lane
 












142,000
 4
Keego
Harbor MI Streets/Roads 
Portman
St
Reconstruc3on
‐
Cass
Lake
Road
to
Willow
Beach
Ave
 












127,000
 4
Keego
Harbor MI Streets/Roads 
Prynne
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Cass
Lake
Road
 












126,000
 4
Keego
Harbor MI Streets/Roads 
Rycrob
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Millwall
Street
 












129,000
 4
Keego
Harbor MI Streets/Roads 
Stapelton
Ct
Reconstruc3on
‐
Cass
Lake
Road
to
End
 












122,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
Keego
Harbor MI Streets/Roads 
Beechcrob
St
Reconstruc3on
‐
Sylvan
Glenn
St
to
End
 












180,000
 5
Keego
Harbor MI Streets/Roads 
Kliest
Ct
Reconstruc3on
‐
Pine
Lake
Ave
S
to
Pine
Lake
Ave
N
 












159,000
 5
Keego
Harbor MI Streets/Roads 
Maddy
Ln
Reconstruc3on
‐
Orchard
Lake
Road
to
south
End
 












170,000
 5
Keego
Harbor MI Streets/Roads 
Pine
Lake
Ave
Reconstruc3on
‐
Orchard
Lake
Road
to
Elam
Court
 












173,000
 5
Keego
Harbor MI Streets/Roads 
Willow
Beach
Ave
Reconstruc3on
‐
Orchard
Lake
Road
to
Canal
 












171,000
 5
Keego
Harbor MI Streets/Roads 
Willow
Beach
Ave
Reconstruc3on
‐
Canal
to
Grove
Court
 












196,000
 6
Keego
Harbor MI Streets/Roads 
Willow
Beach
Ave
Reconstruc3on
‐
Orchard
Lake
Road
to
Summers
Road
 












216,000
 6
Keego
Harbor MI Streets/Roads 
Cass
Lake
Front
Road
Reconstruc3on
‐
Grove
Ct
to
Cass
Lake
Road
 












246,000
 7
Keego
Harbor MI Streets/Roads 
Fordham
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Summers
 












255,000
 7
Keego
Harbor MI Streets/Roads 
Hester
Ct
Reconstruc3on
‐
Orchard
Lake
Road
to
end
 












239,000
 7
Keego
Harbor MI Streets/Roads 
Schroder
Blvd.
Reconstruc3on
‐
Cass
Lake
Road
to
Maddy
Lane
 












251,000
 7
Keego
Harbor MI Streets/Roads 
Summers
Ave
Reconstruc3on
‐
Orchard
Lake
Road
to
Cass
Lake
Road
 












229,000
 7
Keego
Harbor MI Streets/Roads 
Sylvan
Glen
St
Reconstruc3on
‐
Hensman
to
End
 












256,000
 7
Keego
Harbor MI Streets/Roads 
Kendrick
St
Reconstruc3on
‐
Cass
Lake
Road
to
Brock
Street
 












273,000
 8
Keego
Harbor MI Streets/Roads 
Maddy
Ln
Reconstruc3on
‐
Orchard
Lake
Road
to
north
End
 












360,000
 10
Keego
Harbor MI Streets/Roads 
Pridham
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Hessler
Court
 












429,000
 12
Keego
Harbor MI Streets/Roads 
Cass
Lake
Rd
Reconstruc3on
‐
Summers
to
Orchard
Lake
Road
 












460,000
 13
Lansing MI Airport Capital
Region
Interna3onal
Airport
Easement
Acquisi3on
(East
Approach
Runway
28L) 












527,000
 3
Lansing MI Airport Capital
Region
Interna3onal
Airport
Land
Acquisi3on
(Runway
28L) 












105,000
 3
Lansing MI Airport Capital
Region
Interna3onal
Airport
(Construct
Taxiway
to
East
Ramp
‐
Interna3onal
Gate) 












525,000
 20
Lansing MI Airport Capital
Region
Interna3onal
Airport
Federal
Inspec3on
Sta3on
(Construc3on) 










1,052,000
 20
Lansing MI CDBG Downtown
Karp
Project
‐
Redevelopment
Project
‐
Mixed
Use 










1,000,000
 30
Lansing MI CDBG Safe
Routes
to
School
Sidewalk
Gap
Closure
(12
miles
new
sidewalk) 










3,000,000
 40
Lansing MI CDBG Construc3on
of
Lansing
SmartZone
BioBusiness
Incubator 










2,000,000
 50
Lansing MI CDBG Redevelopment
of
the
Deluxe
Inn
Site
into
a
Mixed
Used
Development 










1,000,000
 50
Lansing MI CDBG Renova3on
of
Empty
School
Building
into
the
Informa3on
Technology
Empowerment
Community
Center 










3,000,000
 50
Lansing MI CDBG Redevelopment
of
Office
Building
into
Downtown
SmartZone
Business
Incubator 










2,000,000
 75
Lansing MI CDBG Local
Street
Rehabilita3on
(Mill
and
Resurface
12
Miles) 










6,000,000
 90
Lansing MI CDBG Capital
Club
Towers 










2,000,000
 100
Lansing MI CDBG Lansing
Center
Expansion 








30,000,000
 100
Lansing MI CDBG Mixed
Use
Museum
Drive
Redevelopment
Project 








20,000,000
 150
Lansing MI CDBG Construc3on
of
a
new
City
Market
and
Mixed
Use
Development 










3,000,000
 200
Lansing MI CDBG Green
Zone
Riverfront
Development 








25,000,000
 500
Lansing MI CDBG Redevelopment
of
Ofawa
Power
Plant
into
new
Headquarters
for
Accident
Fund
of
America. 








25,000,000
 500
Lansing MI CDBG Expansion
of
Jackson
Na3onal
Life
Insurance
Headquarters 










2,000,000
 800
Lansing MI Public
Safety Community
Policing
Ini3a3ve
(Neighborhoods
and
Schools) 












800,000
 8
Lansing MI Streets/Roads Major
Street
Rehabilita3on
(Mill
and
resurface
6.5
miles) 










4,000,000
 60
Livonia MI Energy Renovate
HVAC
system
at
Livonia
City
Hall,
to
improve
energy
efficiency,
climate. 










4,500,000

Livonia MI Transit Improve
traffic
signals
opera3ons
along
Merriman
in
the
City. 












950,000

Livonia MI Transit Purchase
23
buses
to
improve
reliability
of
Community
Transit
system. 










1,357,000

Livonia MI Transit Resurfacing
of
Newburgh
Road,
from
Six
Mile
to
Seven
Mile. 










1,000,000

Livonia MI Water Rebuild
aging
water
and
sewer
lines
at
various
loca3ons
throughout
the
city
 










3,000,000

Marshall MI Streets/Roads Mansion
Street/N.
Alley
Parking
Lor
Reconstruc3on 














95,000
 30
Marshall MI Streets/Roads Sidewalk
and
ADA
ramp
installa3on 












290,000
 30
Marshall MI Streets/Roads Rice
Creek
Culvert 












150,000
 35
Marshall MI Streets/Roads Monroe
Street
Bridge
over
Rice
Creek 












600,000
 50
Marshall MI Streets/Roads S.
Marshall
Avenue
over
the
Kalamazoo
River 










1,300,000
 50
Marshall MI Streets/Roads Street
Improvement
Program 












995,000
 50
Marshall MI Water Water
Distribu3on
Improvements 










1,000,000
 50
Marshall MI Water Fairgrounds
Infrastructure
Improvements 










3,700,000
 75
Marshall MI Water C
Drive
Infrastructure
Extension 








23,200,000
 100
Oak
Park MI Energy This,
priority
3
project,
would
secure
funding
of
$825,000
for
the
L.E.D.
retrofit
of
1,032
detroit
edison
street

lights;
1,011
high
pressure
sodium
and
21
mercury
vapor.

The
LED
retrofit
would
create
a
substan3al
energy

savings
‐
the
project
is
ready
t 












825,000

Oak
Park MI Energy Oak
Park
seeks
the
construc3on
of
new
energy
efficient
government
buildings
to
house
the
majority
of

municipal
services.

This
would
replace
an
energy
inefficient
building
constructed
more
than
50
years
ago
and

expanded
several
3mes
to
accomodate
addi3 








17,000,000
 100
Oak
Park MI Streets/Roads This
project
would
secure
the
funding
to
complete
reconstruc3on
of
Meyers
Road,
approximately
3,500
feet
at

an
es3mated
cost
of
$1.9
million.

the
project
would
be
a
joint
effort
between
the
city
of
Oak
Park,

Royal
Oak

Township
and
Road
Commission
for
 










1,900,000

Port
Huron MI CDBG Appamatox
Area
‐
Street
Resurfacing 












648,000
 21
Port
Huron MI Energy replace
parking
lot
and
parks
ligh3ng
with
efficient
ligh3ng 










1,000,000
 33
Port
Huron MI Streets/Roads Riverside
Drive
‐
Mansifeld
to
Elmwood
Reconstruct 












341,000
 11
Port
Huron MI Streets/Roads State
Street
Realignment
reconstruct
roads 










1,160,000
 38
Port
Huron MI Streets/Roads water
street
10th
street
to
arch
reconstruct
concrete
road 










2,100,000
 70
Port
Huron MI Streets/Roads Water
Street
from
Arch
Street
to
City
limits.

Concrete
reconstruc3on
and
water
rmain 










2,500,000
 83
Port
Huron MI Water Cedar
Street
sewer
repair 












116,000
 4
Port
Huron MI Water Replace
Makeup
Air
Furnace
at
the
Waste
Water
Treatment
Plant 












250,000
 8
Port
Huron MI Water Stone
Street
‐
Glenwood
to
Lincoln,
road
reconstruc3on,
watermain,
sanitary
and
sewer
work 












680,000
 23
Port
Huron MI Water Replace
raw
sewage
pumps
at
Waste
Water
Treatment
Plant 












825,000
 27
Port
Huron MI Water diffusers
and
blowers
Waste
Water
Treatment
Plant 










1,620,000
 54
Port
Huron MI Water Erie
Street
north,
reconstruct
roads,
sanitary
and
storm
sewer
separa3on
and
water
main
work 










8,910,000
 297
City State Program Project
Descrip3on Funding
Required Jobs
Port
Huron MI Water 21st
Street
south,
reconstruct
roads,
sanitary
and
storm
sewer
separa3on
and
water
main
work 








17,430,000
 581
Portage MI Streets/Roads Portage
Public
Schools
Coordinated
Transporta3on
/
Infrastructure 












600,000
 50
Portage MI Streets/Roads Local
Street
Reconstruc3on 










1,000,000
 85
Portage MI Streets/Roads Kilgore
Road
‐
South
Westnedge
Avenue
to
Lovers
Lane 










1,300,000
 100
Portage MI Streets/Roads South
Westnedge
Widening
Under
I‐94 










1,300,000
 100
Portage MI Streets/Roads West
Milham
‐
Angling
Road
to
12th
Street 










4,800,000
 200
Portage MI Streets/Roads I‐94
Improvements
‐
Oakland
Drive
to
Portage
Road 








62,500,000
 865
Portage MI Water South
Westnedge
Storm
Sewer
Relief 












750,000
 60
Portage MI Water Angling
Road
Sanitary
Sewer
Project
‐
Squire
Heath
to
Romence
Road 










1,200,000
 100
Portage MI Water Haverhill
Water
Tank
Replacement 










3,600,000
 300
Roseville MI CDBG Kathy
Road
Reconstruc3on‐
Frazho
Road
to
11
Mile
(CDBG
Area) 












640,000
 18
Roseville MI Streets/Roads Common
Road
Patching‐
U3ca
to
Gra3ot 












470,000
 14
Roseville MI Streets/Roads Lifle
Mack
Patching‐
12
Mile
to
13
Mile 












930,000
 26
Roseville MI Streets/Roads Calahan
Road
Reconstruc3on‐
Common
to
13
Mile 










1,040,000
 29
Roseville MI Streets/Roads Groveland
Road
Reconstruc3on‐
Mar3n
to
12
Mile 










1,040,000
 29
Roseville MI Streets/Roads Groveland
Road
Reconstruc3on‐
Frazho
to
11
Mile 










1,100,000
 31
Roseville MI Streets/Roads Calahan
Road
Reconstruc3on‐
12
Mile
to
Common 










1,200,000
 34
Roseville MI Streets/Roads Common
Road
Reconstruc3on‐Groesbeck
to
U3ca 










1,400,000
 39
Roseville MI Water Mar3n
Road
Water
Main
Replacement‐
Brinker
to
East
City
Limit 












550,000
 16
Roseville MI Water U3ca
Water
Main
Replacement‐
Gra3ot
to
Castle 










1,500,000
 42
Roseville MI Water Water
System
Reservoir 










2,500,000
 70
Roseville MI Water Line
or
Replace
Structurally
Defiecient
Sanitary/Combined
Sewers 








15,000,000
 417
Southfield MI Airport Heliport
at
Town
Center
Transit
Center
(11
&
Lasher),
construc3on
and
acquis3on
of
impact
area 








10,000,000
 40
Southfield MI CDBG
Southfield MI CDBG ADA
Pool
‐
Town
Center
with
accessible
locker
rooms 










8,200,000
 40
Southfield MI CDBG John
Grace
Center
‐
employment
training
center
‐
rec
center 








12,000,000
 50
Southfield MI CDBG Senior
Center 








15,000,000
 60
Southfield MI CDBG Local
Street
Pavement
‐
new
watermains,
sewer
reparis
 








30,000,000
 100
Southfield MI Energy energy
efficiences
improvements
for
civic
center
facili3es 








10,000,000
 40
Southfield MI Housing McDowell
Tower 










2,500,000
 10
Southfield MI Public
Safety community
policing
programs 












900,000
 9
Southfield MI Streets/Roads Cornerstone
District
Authority‐
Northland
Drive‐
streetscape,
traffic
control
improvements 












425,000
 2
Southfield MI Streets/Roads Cornerstone
District
Authority‐
Providence
Drive
‐
streetscape,
traffic
control
improvements 












520,000
 3
Southfield MI Streets/Roads Cornerstone
District
Authority‐
sidewalk
connec3ons
and
ADA
upgrades
 












765,000
 3
Southfield MI Streets/Roads Beech
Road
Bridge 










1,000,000
 4
Southfield MI Streets/Roads non‐motorized
paths 










1,000,000
 4
Southfield MI Streets/Roads 11
Mile
Road
over
Pernic
Drain 










1,250,000
 5
Southfield MI Streets/Roads Cornerstone
District
Authority‐
M‐10
‐
streetscape,
traffic
control
improvements 










1,470,000
 5
Southfield MI Streets/Roads Franklin
Road
from
American
Road
to
11
Mile
Road 








16,000,000
 8
Southfield MI Streets/Roads street
ligh3ng
change
out
civic
enter 










1,800,000
 8
Southfield MI Streets/Roads Town
Centre
Corridor
Improvement
Authority‐
streetscape,
traffic
control
improvements 










3,250,000
 10
Southfield MI Streets/Roads Cornerstone
District
Authority‐
Greenfield
streetscape,
traffic
control
improvements 










1,620,000
 12
Southfield MI Streets/Roads Inkster
Road
from
9
to
11
mile 










2,300,000
 12
Southfield MI Streets/Roads Telegraph
Technology
Corridor
Improvement
Authority
‐
streetscape,
traffic
control
improvements 










3,750,000
 12
Southfield MI Streets/Roads Evergreen
Road
from
8
mile
to
9
mile
rd 








35,000,000
 16
Southfield MI Streets/Roads local
street
repairs
sec3on
13
&
water
main
rehab/replacement 










7,000,000
 20
Southfield MI Streets/Roads Washington
Heights,
including
drainage
improvements 










7,000,000
 20
Southfield MI Streets/Roads Cornerstone
District
Authority‐streetscape
improvements
 










5,308,650
 25
Southfield MI Streets/Roads Evergreen
Road
from
10
mile
Road
w.Drainage
improvements
with
street
scape 








15,000,000
 30
Southfield MI Transit Transit
Center
at
Towne
Center
(11
&
Lasher) 










4,500,000
 18
Southfield MI Transit Transit
center
at
CDA 










4,840,000
 20
Southfield MI Water SCADA
System
upgrade 












700,000
 3
Southfield MI Water sanitary
pumping
sta3on
rehabila3on
and
upgrades 










1,000,000
 4
Southfield MI Water Storm
and
Watershed
management
projects
‐
Beech
Woods
Greening
Project 










2,000,000
 4
Southfield MI Water Storm
and
Watershed
management
projects
‐
deten3on
pond
retrofits
(various
sites
throughout
the
City) 










2,000,000
 4
Southfield MI Water Storm
and
Watershed
management
projects
‐
Holy
Sepulture
storm
reten3on
project 










2,000,000
 4
Southfield MI Water Storm
and
Watershed
management
projects
‐
LTU
Wetlands 










2,000,000
 4
Southfield MI Water system
wide
leak
detec3on
program
for
water
conserva3on 










1,000,000
 4
Southfield MI Water Storm
and
Watershed
management
projects
‐
Carpernter
Lake
Nature
Center 










2,000,000
 5
Southfield MI Water Storm
and
Watershed
management
projects
‐
Rouge
River
Green
Corridor 










3,000,000
 6
Southfield MI Water Storm
and
Watershed
management
projects
‐
sep3c
program
(loca3ons
throughout
the
west
side
of
the
city) 










4,000,000
 10
Southfield MI Water Storm
and
Watershed
management
projects
‐
MDOT
Tamarack
Basin 










4,000,000
 16
Southfield MI Water meter
change
out
program 










6,500,000
 20
Southfield MI Water Sanitary
Sewer
Rehabilia3on,
City
Wide 










5,000,000
 20
Southfield MI Water Storm
and
Watershed
management
projects
‐
streabank
and
infrastructure
eroison
projects
(loca3ons

throughout
the
City) 








11,250,000
 25
Southfield MI Water water
system
rehabilita3on 










5,000,000
 25
Southgate MI Energy Construc3on
of
a
10.8
photovoltaic
system
to
provide
electrical
power
to
the
Veterans
Memorial
Library. 












140,000
 5
Southgate MI Public
Safety Construc3on
of
a
regional
911
call
center
to
dispatch
police
and
fire
units
for
up
to
7
ci3es. 










2,000,000
 18
St.
Clair MI CDBG Barrier
Free
Kayak
Access
and
Dock
at
Marina 














75,000
 2.1
City State Program Project
Descrip3on Funding
Required Jobs
St.
Clair MI CDBG Replace
Pavillion
at
Marina 














75,000
 2.1
St.
Clair MI CDBG Floa3ng
Dock
and
Fishing
Pier
at
Rotary
Park 












175,000
 4.9
St.
Clair MI CDBG Fred
Moore
Highway
Bike
Path
Extension
‐
15th
to
Clinton 












250,000
 6.9
St.
Clair MI Streets/Roads Clinton
Street
Parking
and
Streetscape
‐
6th
Street
to
M‐29 












500,000
 13.9
St.
Clair MI Water Line
or
Replace
Deteriorated
Sanitary
Sewers 










2,000,000
 55.6
St.
Clair
Shores MI CDBG Gordon
Paving
‐Harper
to
Florence 












324,000
 9
St.
Clair
Shores MI CDBG Florence
Paving
‐
11
Mile
to
Mar3n 












810,000
 23
St.
Clair
Shores MI CDBG Gladstone
Paving
‐
11
Mile
to
Mar3n 












810,000
 23
St.
Clair
Shores MI CDBG Roy
Paving
‐
11
Mile
to
Mar3n 












810,000
 23
St.
Clair
Shores MI Streets/Roads Lingemann
Paving
‐
Edgewood
to
Loren 












358,000
 10
St.
Clair
Shores MI Streets/Roads 9
Mile
Road
Reconstruc3on
‐
Greater
Mack
to
Harper 










2,050,000
 57
St.
Clair
Shores MI Streets/Roads 9
Mile
Road
Reconstruc3on
‐
Jefferson
to
Greater
Mack 










2,600,000
 72
St.
Clair
Shores MI Water Bon
Brae
Water
Main
‐
Harper
to
B
Street.

Include
the
replacement
of
aging
water
main
in
know
PCB

contaminated
area. 












360,000
 10
St.
Clair
Shores MI Water Euclid
Water
Main
‐
Jefferson
to
Greater
Mack.

Includes
replacement
of
aging
8"
water
main. 












455,000
 13
St.
Clair
Shores MI Water Parkside
Water
Main
‐
Beaconsfield
to
8
Mile.

Includes
replacement
of
aging
8"
water
main. 












485,000
 14
St.
Clair
Shores MI Water 10
Mile
Road
Water
Main
‐
Harper
to
I‐94.

Includes
the
replacement
of
an
80+
year
old
water
main. 










1,150,000
 32
St.
Clair
Shores MI Water Water
Resevoir
Upgrades
‐
Includes
upgrading
former
DWSD
storage
tank
to
sufficient
water
during
peak

periods. 










1,500,000
 42
St.
Clair
Shores MI Water Harper
Water
Main
‐
13
Mile
Road
to
north
City
limits.

Includes
replacment
of
80+
year
old
12"
water
main. 










2,540,000
 71
St.
Clair
Shores MI Water Replace
residen3al
water
meters.

Includes
replacing
all
residen3al
meters
that
have
outlived
their
normal
life

expectancy. 










5,400,000
 150
Sterling
Heights MI CDBG City
Facili3es
Roof
Replacement 












130,000
 20
Sterling
Heights MI Public
Safety 45
New
Mobile
Data
Computers 












300,000

Sterling
Heights MI Public
Safety Mass
No3fica3on
System 












100,000

Sterling
Heights MI Public
Safety Police
911
Replacement
Computer
System 












175,000

Sterling
Heights MI Public
Safety Replace
20
year
old
Fire
Truck 












500,000

Sterling
Heights MI Public
Safety Upgrade
20
year
old
Emergency
Warning
Sirens 












160,000

Sterling
Heights MI Schools Boiler
replacement
at
3
buildings 










1,500,000
 3
Sterling
Heights MI Schools Replacement
of
doors
and
windows
at
22
K‐12
buildings 










3,000,000
 15
Sterling
Heights MI Schools Restroom
remodeling
with
energy
efficient
fixtures
(water
conserva3on
‐
green)
at
22
schools 










5,600,000
 30
Sterling
Heights MI Schools Replace
exis3ng
ligh3ng
and
wiring
to
energy
efficient
T‐8's
with
occupancy
sensors
in
22
K‐12
buildings 








10,000,000
 50
Sterling
Heights MI Schools Roofing
and
insula3on
at
22
K‐12
buildings 








10,000,000
 50
Sterling
Heights MI Streets/Roads Front
End
Loader 












220,000
 5
Sterling
Heights MI Streets/Roads Salt
Brine
Spreaders
for
Snow
Plows 












720,000
 5
Sterling
Heights MI Streets/Roads Street
Sweeper 












240,000
 5
Sterling
Heights MI Streets/Roads Tandem
Axle
Snow
Plow 












150,000
 5
Sterling
Heights MI Streets/Roads 17
Mile
Road
Bridge
Repair 












500,000
 10
Sterling
Heights MI Streets/Roads Intersec3on
Improvements
‐
18
Mile
Road
&
U3ca
Road 










1,920,000
 10
Sterling
Heights MI Streets/Roads Neighborhood
Street
Resurfacing 










2,500,000
 10
Sterling
Heights MI Streets/Roads 15
Mile
Road
Reconstruc3on
(Mound
to
Van
Dyke) 










4,300,000
 20
Sterling
Heights MI Streets/Roads 18
Mile
Road
Widening
‐
Clinton
River
Road
to
Schoenherr
Road 










2,250,000
 20
Sterling
Heights MI Streets/Roads 18
Mile
Road
Widening
‐
Mound
Road
to
Ryan
Road 










4,034,400
 20
Sterling
Heights MI Streets/Roads 18
Mile
Road
Widening
‐
Mound
Road
to
Van
Dyke
(City
share) 












800,000
 20
Sterling
Heights MI Streets/Roads 18
Mile
Road
Widening
‐
Ryan
Road
to
Dequindre
Road 










3,192,000
 20
Sterling
Heights MI Streets/Roads 18
Mile
Road
Widening
‐
Van
Dyke
to
U3ca
Road 










3,564,000
 20
Sterling
Heights MI Streets/Roads 19
Mile
Road
Widening
‐
Dequindre
Road
to
Ryan
Road 










3,500,000
 20
Sterling
Heights MI Streets/Roads 19
Mile
Road
Widening
‐
Mound
Road
to
Van
Dyke 










3,720,000
 20
Sterling
Heights MI Streets/Roads Dodge
Park
Road
Reconstruc3on
&
Widening
‐
Metroparkway
to
U3ca
Road 










2,400,000
 20
Sterling
Heights MI Streets/Roads Repairs
to
Concrete
Major
Roads
(Mound,
Metro
Pkwy) 










1,000,000
 20
Sterling
Heights MI Water Sewer
Jet 












230,000

Sterling
Heights MI Water Storm
Sewer
Lib
Sta3on
Pump
Repairs 












250,000
 10
Taylor
 MI Energy Wind
Farm 








10,000,000
 20
Taylor
 MI Schools Demoli3on
of
exis3ng
public
facility
and
construc3on
of
new
public
facility
to
meet
Title
9
needs.
Joint
School

District/City
project
to
benefit
youth,
schools
and
residents
for
recrec3onal
purposes. 










5,000,000
 50
Taylor
 MI Streets/Roads Beech
Daly
Road
at
Brest
to
Walnut
‐
hot
in
place
with
2"
overlay. 












352,000
 10
Taylor
 MI Streets/Roads Beech
Daly
Road
at
Van
Born
Road
to
Ecorse
Road
‐
hot
in
place
with
2"
overlay. 












320,000
 10
Taylor
 MI Streets/Roads Brest
Road
west
of
Pardee
to
dead
end‐concrete
panel
replacement. 












192,000
 10
Taylor
 MI Streets/Roads Construc3on
of
new
sidewalks
on
Wick
Road
from
Beech
Daly
to
Telegraph.
Will
provide
neighborhoods
with

safe
and
easy
access. 














50,000
 10
Taylor
 MI Streets/Roads Emmef
Street
east
of
Telegraph
to
dead
end
‐
concrete
panel
replacement. 












230,400
 10
Taylor
 MI Streets/Roads Haskell
from
Pelham
to
Merrick
‐
concrete
panel
replacement. 












500,000
 15
Taylor
 MI Streets/Roads Leroy
Street
from
Beech
Daly
to
Inkster
‐
concrete
panel
replacement. 












599,400
 15
Taylor
 MI Streets/Roads Total
resurfacing
of
Brest
Road
from
Beech
Daly
to
Telegraph
Road. 












653,000
 15
Taylor
 MI Streets/Roads Wick
Road
six
lane
miles
of
resurfacing. 










1,000,000
 15
Taylor
 MI Streets/Roads Delta
Drive
total
reconstruc3on
from
Universal
Drive
to
Brest
Road. 










1,300,000
 30
Taylor
 MI Streets/Roads Universal
Drive
total
reconstruc3on
from
Northline
Road
to
Brest
Road. 










1,225,000
 30
Taylor
 MI Streets/Roads Trolley
Industrial
Drive
East
off
Monroe
to
dead
end
whitetopping
project. 










1,713,000
 40
Taylor
 MI Streets/Roads 50
miles
of
local
road
asphalt
resurfacing. 










6,000,000
 50
Taylor
 MI Streets/Roads Fox
Crob
Subdivision
reconstruc3on
2.5
miles. 










4,500,000
 50
Taylor
 MI Streets/Roads Local
neighborhood
soundwall
construc3on
at
I
94
and
Telegraph
as
required
by
the
Federal
Government. 










3,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Taylor
 MI Water Eliminate
gap
in
the
12"water
main
on
Inkster
Road
at
Wick
Road.
Extend
water
main
under
Wick
Road
to

create
a
system
loop 














70,000
 10
Taylor
 MI Water Extend
the
8"
water
main
along
Brest
Road,
west
of
Cape
Cod
to
connect
to
the
12"
water
main
along
Inkster

Road.
This
will
eliminate
a
dead‐end
and
complete
the
loop
in
that
area.
768
linear
feet. 












150,000
 10
Taylor
 MI Water Relining
of
exis3ng
water
main
8"
and
12"
throughout
the
City
of
Taylor 










5,000,000
 20
Taylor
 MI Water Replace
8"
water
main
on
Pelham
Road
from
Pinecrest
to
Van
Born
with
12"
water
main.
This
will
eliminate
the

sec3on
of
dead‐end
water
main
along
Van
Born,
east
of
Monroe,
and
create
another
ac3ve
connec3on

between
the
northermost
sec3ons
of
the
City
w 












750,000
 20
Taylor
 MI Water Replace
8"water
main
on
Pelham
Road
from
the
south
side
of
94
to
Van
Born
with
12"
water
main.
1575
linear

feet. 










1,000,000
 20
Wayne MI Streets/Roads Newburgh
Road
from
Glenwood
Road
to
Michigan
Avenue
‐
Defficient
Concrete
Pavement
Removal
&

Repalacement 










1,000,000
 12
Wayne MI Streets/Roads Elizabeth
Street
from
Glenwood
Road
to
Annapolis
Road
‐
Defficient
Concrete
Pavement
Removal
&

Repalacement 










2,000,000
 25
Wayne MI Streets/Roads Second
Street
from
Glenwood
Road
to
Annapolis
‐
Defficient
Concrete
Pavement
Removal
&
Repalacement 










2,000,000
 25
Wayne MI Streets/Roads Annapolis
Road
From
Merriman
Road
to
Elizabeth
Street
‐
Defficient
Concrete
Pavement
Removal
&

Repalacement 










3,000,000
 35
Wayne MI Water Watermain
Replacement
Phase
IX 










3,100,000
 36
Wayne MI Water Watermain
Replacement
Phase
X 










2,600,000
 36
Wayne MI Water Slipline
remainder
of
the
City's
Sanitary
Sewer
System 








14,000,000
 50
Westland MI CDBG Central
City
Park
Environmental
Remedia3on
‐

Remediate
contaminated
soil
in
Central
City
Park,
discoved
in
2006. 










1,000,000
 10
Westland MI CDBG Public
Facili3es
Renova3ons
‐

Renova3ons
for
3
major
community
centers:
Friendship
Senior
Center
‐
hosts
city
sponsored
senior
programming.
Carpet,
pain3ng
(not
renovated
for
12
years)
Dorsey
Center
‐
hosts
city
sponsored
youth
programs,
includin 












250,000
 10
Westland MI CDBG Concession
Building
Replacement.

Replace
the
exis3ng
concession
building
in
new
loca3on
aber
remedia3on

of
brownsfield.
 












400,000
 11
Westland MI CDBG Grand
Traverse,
Merriman
to
Venoy.

Pavement
replacement
with
storm
sewer
improvements
including
ditch

work. 












500,000
 14
Westland MI CDBG Grand
Traverse,
Venoy
to
Wildwood.

Pavement
replacement
with
storm
sewer
improvements
including
ditch

work. 












500,000
 14
Westland MI CDBG Reconstruc3on
of
Mathew
Street
‐

Reconstruct
major
neighborhood
thoroughfare,
currently
in
delapidated
condi3on.

Reconstruc3on
will

stabilize
this
main
artery
of
histric
african
american
community,
located
in
southeast
corner
of
the
city. 












300,000
 15
Westland MI Public
Safety 10
fully
marked
scout
cars
with
full
compliment
of
electronic
equipment 












350,000

Westland MI Public
Safety replace
30
in‐sta3on
PC's
 












120,000
 2
Westland MI Public
Safety replace
30
in‐car
computers
with
new
modems
 












200,000
 4
Westland MI Public
Safety 8
cer3fied
emergency
dispatchers
to
supplement
our
two
city,
police
and
fire,
combined
dispatch 












700,000
 8
Westland MI Public
Safety 20
police
officers
to
bollster
patrol
response,
have
full
3me
crime
suppression
on
each
shib.
Also,
add
school

resource
officer
and
community
police
officers.
The
hiring
list
is
ready
and
the
officers
can
be
added
as
soon
as

funding
is
approved.
Also
ad 










2,400,000
 21
Westland MI Streets/Roads Randy
Street
Resurfacing
and
reconstruc3on.

Select
slab
replacement
with
full
depth
reconstruc3on
of

exis3ng
pavement. 












350,000
 10
Westland MI Streets/Roads Cherry
Hill
and
Newburgh
intersec3on
moderniza3on.

Replace
exis3ng
pavement
and
upgrade
signal. 












500,000
 14
Westland MI Streets/Roads Warren
Rd.
and
Newburgh
intersec3on
replacement
project.

Modernize
the
intersec3on
with
pavement
and

poten3al
signal
improvements. 












565,000
 16
Westland MI Streets/Roads Florence
Street.

Correct
exis3ng
drainage
problems
and
flooding
with
new
proposed
pavement
sec3on
and

storm
sewer. 












669,000
 19
Westland MI Streets/Roads Avondale,
Wayne
Rd.
to
Henry
Ruff.

Replacement
exis3ng
failing
public
road
with
new
pavement
and
subbase

sec3on. 












860,000
 24
Westland MI Streets/Roads Flamingo
Street
Reconstruc3on.

Replace
road
pavement
and
address
any
public
u3lity
issues. 












898,400
 25
Westland MI Streets/Roads Newburgh
Road
Preventa3ve
Maintenance
Program.

Rehab.
from
Palmer
to
Joy
Rd.
with
joint
sealing,
over

banding,
concrete
base
repair,
and
overlay. 










1,200,000
 34
Westland MI Streets/Roads Norma
Street
Reconstruct.

Replace
exis3ng
pavement
with
9"
concrete
cross‐sec3on,
and
repair
any
exis3ng

infrastructure
problems. 










1,700,000
 48
Westland MI Streets/Roads Mafhew
Street
Reconstruc3on.

Replace
failing
road
pavement,
water
main,
sanitary
and
storm
sewer. 










1,743,000
 49
Westland MI Streets/Roads Wayne
Highlands
Drainage
Project.

Pave
exis3ng
roads
and
improve
storm
sewer
system
to
reduce
flooding. 










2,200,000
 62
Westland MI Streets/Roads Gravel
Road
Resurfacing
Program.

Pave
exis3ng
gravel
roads
with
a
4"/8"
bituminous
pavement
or
a
7"

concrete
pavement,
and
provide
storm
sewer. 








10,230,000
 292
Westland MI Water Norwayne
Sewer
CIP.

Reduc3on
of
cfs
in
CSO
area
37
based
on


sanitary
sewer
SSES
study. 










1,000,000
 28
Westland MI Water Sanitary
Sewer
CIP.

Replace
old,
and
failing
infrastructure
of
the
City's
sanitary
sewer
system. 










3,000,000
 85
Westland MI Water Foo3ng
Drain
Disconnect
Program.

Disconnect
1,000
homes
from
foo3ng
drain
discharge
into
the
sanitary

sewer
system
and
reduce
treated
cfs.
 








10,000,000
 285
Arden
Hills MN CDBG Neighborhood
Street
and
U3lity
Reconstruc3on 










2,000,000
 35
Arden
Hills MN CDBG Installa3on
of
public
infrastructure
to
enable
redevelopment
of
585
acre
Federal
brownfield
site
(TCAAP)
into
a

billion
dollar
mixed
use
development,
including
right
of
way
prep
involving
demoli3on
of
substandard

buildings,
soil
correc3on,
and
grading. 








40,000,000
 7500
Arden
Hills MN Streets/Roads Bridge
improvements
over
a
trunk
highway
to
accommodate
pedestrian
movements
and
associated

pathway/sidewalk
construc3on 












800,000
 25
Arden
Hills MN Water Sanitary
Sewer
Main
Lining
Project 












250,000
 15
Avon MN CDBG Blafner
Drive
Improvements 












300,000
 6
Avon MN CDBG Strazord
Avenue
Improvements 












500,000
 6
Avon MN CDBG Street
Improvements 












700,000
 10
Avon MN Energy LED
Street
Light
Conversion 












125,000
 6
City State Program Project
Descrip3on Funding
Required Jobs
Avon MN Energy Police
Garge
Engergy
Improvements,
Doors,
Window,
Insula3on 














50,000
 8
Avon MN Public
Safety Fire
Department‐800
Mhz
Radios 














50,000
 2
Belgrade MN CDBG City
Hall
Building
Improvements 












100,000
 4
Belgrade MN CDBG Storm
Sewer
Replacement
along
TH
71 












500,000
 6
Belgrade MN CDBG Downtown
Redevelopment‐Building
Rehab 










1,000,000
 40
Belgrade MN Housing Public
Housing
Rehab,
including
energy
improvements 












100,000
 4
Belgrade MN Water Sewer
Rehab‐
Replace
aging
clay
pipe
to
reduce
I&I
and
reduce
sewer
backups
from
root
intrusion 










1,000,000
 12
Belgrade MN Water Water
Treatment
Facility 










1,200,000
 30
Burnsville MN CDBG City
Hall
Roof
Replacment 












451,000
 4
Burnsville MN CDBG Nicollet
Commons
Water
Feature
Rehab 












550,000
 5
Burnsville MN CDBG Fire
Sta3on
Number
1
Addi3on 












600,000
 6
Burnsville MN CDBG Youth
Center
Addi3on 










1,100,000
 10
Burnsville MN Energy Greenhouse
Gas
Tracking
Program 














50,000
 1
Burnsville MN Energy Energy
Audits
on
All
Public
Buildings 












100,000
 2
Burnsville MN Energy Sustainability
Model
for
Renovated
Youth
Center 










1,000,000
 5
Burnsville MN Energy Geo‐Thermal
Replacement
for
Ice
Center
Compressor 










4,300,000
 40
Burnsville MN Public
Safety Drug
Task
Force
Addi3on 












150,000
 1
Burnsville MN Public
Safety Evidence
/
Property
Room
Technology
Upgrades 












238,000
 1
Burnsville MN Public
Safety Gang
Task
Force
Unit 












275,000
 2
Burnsville MN Public
Safety Mul3‐Family
Housing
Manpower
Unit 












284,000
 2
Burnsville MN Public
Safety Retail
Crime
Manpower
Unit 












245,000
 2
Burnsville MN Public
Safety Surveilance
Camera
Technology
Upgrades 












185,000
 2
Burnsville MN Public
Safety Dispatch
Computer
Aided
Dispatch
&
Records
Management
Sobware
Upgrade 










2,500,000
 25
Burnsville MN Schools Hidden
Valley
Ext
Masonry
Repair 












148,000
 3
Burnsville MN Schools Rahn
Elementary
Roof
Replacement 












378,000
 5
Burnsville MN Schools Hanson
Field
Turf
Replacement 










1,100,000
 10
Burnsville MN Schools Sky
Oaks
Elementary
Roof
Replacment 










1,085,000
 12
Burnsville MN Schools Telecommunica3ons
System
Replacement 










1,000,000
 12
Burnsville MN Schools M
W
Savage
Elementary
Roof
Replacement 










1,338,000
 15
Burnsville MN Schools Metcalf
Junior
High
School
Remodeling 










6,031,000
 75
Burnsville MN Schools Burnsville
Senior
High
Phase
I
Remodeling 










6,357,000
 80
Burnsville MN Streets/Roads Pedestrian
Overpass
‐
TH
13
/
Diffley 










1,500,000
 15
Burnsville MN Streets/Roads Pedestrian
Overpass
‐
TH
13
/
Nicollet
Ave 










1,500,000
 15
Burnsville MN Streets/Roads I35W
‐
118th
St
Interchange‐Prelim
Design 










3,000,000
 30
Burnsville MN Streets/Roads Chowen
Intersec3on 










9,500,000
 100
Burnsville MN Streets/Roads CSAH
5
‐
CSAH
32
Interconnector
‐
Environmental
&
Right
of
Way 








20,000,000
 200
Burnsville MN Streets/Roads T
H
13
/
CSAH
5
Interchange
‐
Final
Design
&
Right
of
Way 








27,000,000
 250
Burnsville MN Water Lib
Sta3on
Rehabilita3on 












200,000
 2
Burnsville MN Water Water
Treatment
Plant
HVAC
Upgrades 












225,000
 2
Burnsville MN Water Reservoir
Pump
Efficiency
Upgrades 












360,000
 4
Chanhassen MN CDBG City
Hall
Parking
Lot
Improvements 












280,000
 15
Chanhassen MN CDBG Well
#
13
Parking
Lot
and
water
qualiity
Improvements 














90,000
 20
Chanhassen MN CDBG Annual
Street
Improvements 










1,665,000
 25
Chanhassen MN CDBG West
Lotus
Lake
Drainage
Imp. 












475,000
 25
Chanhassen MN CDBG Audubon
Street
Reconstruc3on
Project
(Lyman
Blvd.
to
Lake
Drive) 










3,000,000
 45
Chanhassen MN CDBG Fire
Sta3on
#3 










2,000,000
 75
Chanhassen MN CDBG Lyman
Blvd
Improvements
Phase
#2 










5,300,000
 75
Chanhassen MN CDBG Public
Works
Facililty
Improvements 










8,300,000
 135
Chanhassen MN Streets/Roads TH
5
and
Minnewashta
Parkway
(Intersec3on
Safetly
Improvements) 












500,000
 25
Chanhassen MN Transit Downtown
Transit
Sta3on
Site
Improvements 










1,845,000
 35
Chanhassen MN Water Sanitary
Lib
Sta3on
Rehabila3on
at
various
sta3ons 












350,000
 20
Chanhassen MN Water Dell
Road
/77th
Street
Sanitary
Forcemain
Replacement 












125,000
 25
Chanhassen MN Water Dell
Road/
77th
Street
Watermain
Replacement 












185,000
 25
Chanhassen MN Water Sanitary
Sewer
Inflow/Infiltra3on
Abatement 












600,000
 25
Chanhassen MN Water Well
#4
Improvements
‐
Radium,
Iron
and
Manganese
removal 












930,000
 35
Chanhassen MN Water Sanitary
Sewer
Lib
Sta3on
#32
Improvments 










1,900,000
 45
Chanhassen MN Water Melody
Hills
Water
Tower
(High
Zone)
Improvements 










2,150,000
 60
Chanhassen MN Water West
Water
Treatment
Plant
Improvements
(removal
of
Iron
and
Manganese
from
raw
water) 








11,000,000
 175
Duluth MN Airport DYT
fuel
and
security
upgrades 












125,000
 15
Duluth MN Airport DYT
apron
reconstruc3on 












650,000
 20
Duluth MN Airport Passenger
loading
bridges 










1,500,000
 25
Duluth MN Airport Terminal
design
phase
2 










2,000,000
 25
Duluth MN Airport Install
fiberop3c
cables 












700,000
 28
Duluth MN Airport Rwy
3/21
C,
D
ligh3ng 










1,500,000
 52
Duluth MN Airport Construct
runway
approach 








10,000,000
 80
Duluth MN Airport Reconstruct
Txwy
C,
D,
A2w 










4,000,000
 85
Duluth MN Airport Rwy
9/27
Panel
Recl. 








16,000,000
 85
Duluth MN Airport Txy
A
realignment 








11,000,000
 85
Duluth MN Airport Terminal
road,
parking
and
u3li3es 










8,978,000
 90
Duluth MN Airport Terminal
Building
Construc3on 








20,900,000
 300
City State Program Project
Descrip3on Funding
Required Jobs
Duluth MN CDBG Energy
resource
incubator
for
small
business 












500,000
 10
Duluth MN CDBG Overhead
door
replacement‐fire
halls 












375,000
 12
Duluth MN CDBG ADA
elevator
upgrades‐city
hall,
skywalks,
library 










2,485,000
 14
Duluth MN CDBG Technical
assistance
to
small
business 












160,000
 16
Duluth MN CDBG Storefront
renova3ons
for
small
business 












300,000
 21
Duluth MN CDBG Lakewalk
extension
‐
Beacon
Point 










2,000,000
 25
Duluth MN CDBG Neighborhood
revitaliza3on‐lateral
sewer
lines 










1,000,000
 25
Duluth MN CDBG Fleet
maintenance
energy
reclaimer 










3,250,000
 34
Duluth MN CDBG Lakewalk
extension
‐
60th
Avenue
East 










4,878,000
 48
Duluth MN CDBG Harbor
Highlands
phase
IV 










1,500,000
 50
Duluth MN CDBG Public
farmers'
market
construc3on 










2,000,000
 60
Duluth MN CDBG Fire
sta3on
replacement‐Park
Point,
Gary,
Duluth
Heights 










3,789,000
 90
Duluth MN Energy Eliminate
Duluth
Steam
District
1
vaults 












120,000
 5
Duluth MN Energy Duluth
Steam
District
1
stack
repairs 












400,000
 6
Duluth MN Energy Lowell
School
energy
improvements 










1,379,902
 8
Duluth MN Energy Homecrob
school
energy
improvements 










1,433,688
 9
Duluth MN Energy Central
steam
conversion
for
mul3‐family
rental 












400,000
 10
Duluth MN Energy Lake
Avenue
convert
steam
line
to
hot
water
line 












750,000
 12
Duluth MN Energy City
Hall
hot
water
solar
arrays 










1,485,000
 14
Duluth MN Energy Wind
genera3on
system
for
mul3‐family
rental 












800,000
 17
Duluth MN Energy Replace
city
hall
windows 










1,420,250
 18
Duluth MN Energy Library
Mechanical
System
Replacement
&
Upgrade 










1,200,000
 20
Duluth MN Energy Wind
turbines
Spirit
Mountain
and
East
toolhouse 










1,768,500
 28
Duluth MN Energy Fire
halls
ground
water
heat
source
and
emergency
wind
turbine
power 










2,750,000
 34
Duluth MN Energy Boiler
upgrades/moderiza3ons
of
city
structures 










2,685,000
 38
Duluth MN Energy Denfeld
school
energy
improvements 










6,329,180
 38
Duluth MN Energy Public
and
private
building
energy
retrofits 










3,500,000
 40
Duluth MN Energy Solar
powered
hot
water
boosters
‐
water
treatment
plant 










4,800,000
 40
Duluth MN Energy Community
centers
geothermal
energy
systems‐Piedmont,
Portman,Irving 










4,126,000
 48
Duluth MN Energy Solar
hot
water
reclaiming
system
at
Garfield
and
42nd
toolhouses 










3,685,000
 48
Duluth MN Energy Heat
reclama3on,
geothermal
and
centralized
heat
source
at
zoo 










5,600,000
 50
Duluth MN Energy Community
housing
weatheriza3on/retrofits 










7,950,000
 95
Duluth MN Housing Clean
Ductwork
at
Six
Highrises 












125,000
 5
Duluth MN Housing Replace
Windows
at
Grandview
Manor 












400,000
 6
Duluth MN Housing Replace
Siding
on
25
Scafered
Site
Homes 












500,000
 7
Duluth MN Housing Replace
Stoves
&
Refrigerators
in
all
Public
Housing
Units
with
energy
efficient
models 












900,000
 7
Duluth MN Housing Boiler
Upgrades
at
Midtowne
Manor
I
&
II 












800,000
 10
Duluth MN Housing Replace
Kitchen
Cabinets
&
flooring
at
26
scafered
site
duplex
units 












800,000
 12
Duluth MN Housing Replace
Spalling
Brick
on
Ramsey
Manor 










1,000,000
 12
Duluth MN Housing Elevator
Upgrades
at
Midtowne
Manor
II,
Lincoln
Center,
Ramsey
Manor
&
Grandview
Mannor 










1,850,000
 14
Duluth MN Housing Public
Space
Upgrades
at
Tri‐Towers 












450,000
 14
Duluth MN Housing Replace
Interior
Entry
and
Closet
Doors/locks
at
six
high‐rises 










1,425,000
 14
Duluth MN Housing Upgrade
Bathrooms
&
Replace
Apartment
flooring
at
Grandview
Manor 












700,000
 14
Duluth MN Housing Replace
Kitchen
Cabinets
and
Apartment
flooring
at
Midtwone
Manor
II 










1,600,000
 16
Duluth MN Housing Replace
Roof
and
Siding
&
install
Front
Porches
on
26
scafered
site
duplex
units 












765,000
 16
Duluth MN Housing Replace
Kitchen
Cabinets,
flooring
and
rear
entry
storm
doors
at
Fairmont
Homes 












710,000
 18
Duluth MN Housing Re‐skin
exterior
of
Midtowne
Manors
I
&
II 










4,500,000
 18
Duluth MN Housing Upgrade
Bathrooms
and
replace
apartment
flooring
at
King
Manor 












800,000
 20
Duluth MN Housing Upgrade
Bathrooms
and
replace
apartment
flooring
at
Midtowne
Manor
I 










1,700,000
 22
Duluth MN Housing Upgrade
Bathrooms
and
replace
apartment
flooring
at
Ramsey
Manor 










1,700,000
 22
Duluth MN Housing Lead
Abatement
&
Moderniza3on
of
10
Scafered 










1,700,000
 30
Duluth MN Housing Upgrade
Bathrooms
and
replace
apartment
flooring
at
Tri‐Towers 










2,750,000
 35
Duluth MN Public
Safety Computer
forensics
inves3gator 














60,000
 1
Duluth MN Public
Safety Crime
analyst 














60,000
 1
Duluth MN Public
Safety Community
policing
ini3a3ve 












500,000
 6
Duluth MN Public
Safety Joint
public
safety
facility
construc3on 








14,300,000
 144
Duluth MN Schools New
western
middle
school 










4,000,000
 24
Duluth MN Schools Lowell
school
renova3on 










6,329,180
 38
Duluth MN Schools Ordean
stadium 










6,266,391
 38
Duluth MN Schools New
Lester
Park
school 










7,000,000
 42
Duluth MN Schools Homecrob
school
addi3on/renova3on 










7,166,994
 43
Duluth MN Schools New
Laura
McArthur
school 








10,500,000
 63
Duluth MN Schools Denfeld
school
addi3on/renova3on 








11,670,820
 70
Duluth MN Schools Ordean
school
addi3on/renova3on 








23,500,000
 141
Duluth MN Streets/Roads Salt
Brine
Spreaders
(9)
for
Snow
Plows 










8,500,000
 0
Duluth MN Streets/Roads Relocate
railroad
track
siding
for
Lakeside
train
sta3on 












250,000
 6
Duluth MN Streets/Roads Lincoln
Park
Drive
Bridge
replacement 












700,000
 10
Duluth MN Streets/Roads MSA
Street
recondi3oning 










8,500,000
 10
Duluth MN Streets/Roads Replacetemporary
signals
at
mul3ple
loca3ons 












900,000
 10
Duluth MN Streets/Roads Second
St.
Bridge
at
13th
Avenue
East 












750,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Duluth MN Streets/Roads 26th
Ave.
West
Bridge
over
Miller
Creek 










1,500,000
 15
Duluth MN Streets/Roads Aerial
Lib
Bridge
Pain3ng 










5,000,000
 15
Duluth MN Streets/Roads Chris
Jensen
site
road 










1,100,000
 18
Duluth MN Streets/Roads Knife
River
Bridge
replacement 










1,300,000
 18
Duluth MN Streets/Roads Rice
Lake
Road
mill
and
overlay 










1,400,000
 20
Duluth MN Streets/Roads Woodland
Avenue
reconstruc3on
(Kent
to
Arrowhead) 










2,000,000
 20
Duluth MN Streets/Roads Street
pedestrian
safety
improvements 








10,000,000
 45
Duluth MN Transit Duluth
Transit
Authority
technology
projects 












427,000
 6
Duluth MN Transit Duluth
Transit
Authority
energy
projects 












540,000
 8
Duluth MN Transit Facility
improvements 












796,000
 11
Duluth MN Transit Depot
train
garage
roof
replacement 












500,000
 18
Duluth MN Transit West
Duluth
rail 










2,050,000
 32
Duluth MN Transit East
Duluth
rail
project 








16,950,100
 224
Duluth MN Transit Downtown
fixed
rail
trolley 








24,000,000
 336
Duluth MN Transit Transit
connec3vity
plazorm 








31,800,000
 445
Duluth MN Water Arlington
booster
sta3on 










2,300,000
 10
Duluth MN Water Arlington
transmission
line 










3,500,000
 10
Duluth MN Water Highland
booster
sta3on 










1,500,000
 10
Duluth MN Water Water
main
replacement 












800,000
 10
Duluth MN Water Riverside
u3lity
project 










2,500,000
 20
Duluth MN Water West
Duluth
reservoir 










3,000,000
 25
Duluth MN Water Endion
sanitary
sewer
overflow 










6,000,000
 30
Duluth MN Water Spirit
Mountain
snowmaking
and
maintenance
facility 










6,000,000
 70
Edina MN CDBG Well
Rehabilita3on
‐
#13 












150,000
 6
Edina MN CDBG Rehabilitate
Lib
Sta3ons
‐
1,
2,
&
7 












350,000
 15
Edina MN CDBG Public
Works
Maintenance
Facility 








14,000,000
 150
Edina MN Streets/Roads Bridge
‐
West
56th
Street
over
Minneahaha
Creek 












400,000
 26
Edina MN Streets/Roads Bridge
‐
West
54th
Street
over
Minnehaha
Creek 












550,000
 34
Edina MN Streets/Roads Mill
and
Overlay
‐
Benton
Ave,
Blake
Rd,
W
69th
St,
W
70th
St 










1,877,000
 126
Hanover MN CDBG Historic
Bridge‐redecking 












125,000
 4
Hanover MN CDBG Hanover
Bicycle
&
Pedestrian
Trail
‐
Phase
2 












300,000
 6
Hanover MN CDBG Pearson
Industrial
Park
Development‐provide
sewer
and
water
service
to
enhance
development
opportuninty 












400,000
 8
Hanover MN CDBG Public
Works
Building 












750,000
 12
Hanover MN CDBG Pheasant
Run
Sewer
Extension,
Eliminate
Failing
Sep3c
Systems 










1,500,000
 17
Hanover MN CDBG Whitetail
Lane‐
Sewer
and
Water
Extension,
eliminate
failing
sep3c
systems 










1,500,000
 17
Hanover MN CDBG Hanover
Hills
Sewer
and
Water
Extension,
Eliminate
failing
sep3c
systems 










2,500,000
 28
Hanover MN CDBG SE
Annexa3on
Area
Sewer
&
Water
‐
Phase
1 










3,500,000
 39
Hanover MN Energy LED
Street
Light
Conversion 












750,000
 8
Hanover MN Streets/Roads River
Road
NE
Reconstruc3on
and
Drainage
Improvements 










1,500,000
 18
Hanover MN Streets/Roads 8th
Street
Industrial
Park
Road
Extension 










2,000,000
 22
Hugo MN Streets/Roads TH
61/130th
Street:

Intersec3on
Safety
Improvements
including
addi3on
of
turn
lanes
on
TH
61,
Widening

130th
Street,
Grading,
Drainage
improvements
and
a
Traffic
Signal
System. 












790,000
 75
Hugo MN Streets/Roads TH
61/147th
Street:

Intersec3on
Safety
Improvements
including
addi3on
of
turn
lanes
on
TH
61,
Widening

147th
Street,
re‐striping
TH
61,
Grading,
Curb
and
Gufer,
Drainage
improvements
and
a
Traffic
Signal
System. 










1,900,000
 75
Hugo MN Streets/Roads Bald
Eagle
Bridge 












441,000
 100
Hugo MN Water TH
61
Watermain
Loop:

The
construc3on
of
a
12‐inch
watermain
loop
from
136th
Street
to
130th
Street
along

TH
61
to
assist
with
pressures
and
fireflows
following
the
construc3n
of
a
new
water
tower
and
well. 












175,000
 50
Hugo MN Water New
Water
Tower
No.
4:

The
construc3on
of
a
new
1.5
million
gallon
composite
water
tower
to
meet
the

City's
projected
average
day
demands
as
recommended
by
the
Ten‐State
Standards. 










3,800,000
 125
Hugo MN Water New
Well/Well
House
No.
6:

The
construc3on
of
a
new
well
and
well
house
to
meet
the
City's
projected
peak

water
demands
as
recommended
by
the
Ten‐State
Standards
and
the
Department
of
Natural
Resources. 










1,500,000
 125
Isle
 MN CDBG Merit
Enterprise
Rebuilding
Assistance.

Funds
to
assist
Merit
Enterprise
in
rebuilding
in
the
City
of
Isle
aber

fire
destroyed
their
building.
Funds
will
be
used
to
offset
infrastructure
costs
to
rebuild
in
a
new
industrial

park. 












150,000
 4
Isle
 MN Streets/Roads Malone
Island
Bridge
Replacement 












750,000
 10
Isle
 MN Streets/Roads Industrial
Park
Street
and
Storm
Sewer 










1,000,000
 14
Isle
 MN Water Sewer
extension
to
Fire
Hall
and
other
residences
to
elimnate
a
failing
sep3c
systems 












500,000
 8
Isle
 MN Water North
End
Sewer
and
Watermain
Extension 










1,000,000
 12
Isle
 MN Water Mille
Lacs
Band
of
Ojibwe
Sewer
and
Watermain
Extension
to
eliminate
failing
sep3c
systems 










1,500,000
 17
Isle
 MN Water Industrial
Park
Sewer
and
Watermain
Extension 










2,500,000
 28
Mahtomedi MN Streets/Roads Mill
&
Overlay:

Roadway
mill
and
overlay
of
Hallam
Avenue,
Wedgewood
Drive,
and
Wildridge
Drive. 












620,000
 50
Mahtomedi MN Streets/Roads TH
244
at
Old
Wildwood
Road:

Intersec3on
Safety
Improvements
including
widening
of
TH
244
for
a
By‐pass

lane
and
right
turn
lane,
realignment
of
Old
Wildwood
Road,
Grading
and
Drainage
improvements
within

exis3ng
right
of
way
and
easements. 












200,000
 75
Mahtomedi MN Water Tamarack
Lib
Sta3on
Rehabilita3on:

Rehabilita3on
of
an
exis3ng
lib
sta3on
with
the
construc3on
of
a
new
wet

well,
valve
vault,
and
control
system. 












300,000
 20
Mahtomedi MN Water Well
House
No.
4
Rehabilita3on:

The
construc3on
of
a
well
house
to
replace
the
exis3ng
well
house. 












800,000
 125
Melrose MN CDBG 1st
Street
South
to
Industrial
Park
Construc3on 












700,000
 6
Melrose MN CDBG 5th
Street
North
Reconstruc3on 












500,000
 6
Melrose MN CDBG Turkey
Lane
Reconstruc3on 












500,000
 6
Melrose MN Energy Public
Works
Energy
Improvements 














75,000
 4
Melrose MN Energy LED
Street
Light
Conversion 












250,000
 6
City State Program Project
Descrip3on Funding
Required Jobs
Melrose MN Public
Safety 800
mhz
Radio
System 














50,000
 4
Melrose MN Water Water
Treatment
Facility 










6,500,000
 72
Minneapolis MN Water Tunnel
Rehabilita3on
Project‐10th
Avenue
Southeast
Tunnel
System
‐
The
10th
Avenue
Tunnel
system
was
built
 










1,300,000
 20
Moorhead MN Streets/Roads 20th
Ave
S,
14‐20th
St
Resurfacing 












300,000
 10
Moorhead MN Streets/Roads 24th
Ave
S,
Rivershore
Dr‐10th
St
Recondi3oning 












500,000
 10
Moorhead MN Streets/Roads 4th
Ave
S,
14th
St‐SE
Main
Ave
Recondi3oning 












550,000
 15
Moorhead MN Streets/Roads 15th
Ave
N,
Red
River
to
TH
75
Resurfacing 












700,000
 20
Moorhead MN Streets/Roads 20th
Ave
S,
5‐11th
St
Recondi3oning 












800,000
 20
Moorhead MN Streets/Roads 4th
Ave
S,
21‐34th
St
Recondi3oning 












900,000
 20
Moorhead MN Streets/Roads Main
Ave,
14‐18‐1/2
St
Recondi3oning 










1,200,000
 20
Moorhead MN Streets/Roads 1st
Ave
N,
TH
10
to
Red
River
Resurfacing 










2,250,000
 25
Moorhead MN Streets/Roads SE
Main
Ave,
Oak
Way‐I‐94
Resurfacing 










1,700,000
 25
Moorhead MN Streets/Roads SE
Main
Ave/20th
St/21st
St
Railroad
Grade
Separa3on 








35,000,000
 100
New
Munich MN Water Expand
Wastewater
Treatment
Ponds 












700,000
 8
Princeton MN CDBG Mobile
Home
Park
Sewer/Water/Street
Improvements 










1,500,000
 18
Princeton MN CDBG North
Sewer,Water,
Storm
Sewer,
Street
Improvements‐
Fire
Protec3on 










3,500,000
 27
Princeton MN CDBG Public
U3lity‐
Maintenance
Shop 










1,700,000
 38
Princeton MN CDBG Public
Safety
Building‐Emergency
Opera3on
Center 










6,200,000
 68
Princeton MN Energy Public
Works
Facitlity
Energy
Imrovements 














75,000
 2
Princeton MN Energy 4th
Avenue
‐
Energy
Improvements 












100,000
 6
Princeton MN Energy Downtown
Energy
Efficient
Ligh3ng 












250,000
 6
Princeton MN Energy Public
U3lity
Facility
Energy
Improvements,
Insula3on,
Roof,
Hea3ng 












350,000
 6
Princeton MN Public
Safety Patrol
Officer 














65,000
 1
Princeton MN Public
Safety 800
mhz
Radio
System
Upgrade 














75,000
 3
Princeton MN Streets/Roads Dunn
Bridge
Replacement 










1,250,000
 15
Princeton MN Streets/Roads 21st
Avenue
Extension 










1,500,000
 20
Princeton MN Streets/Roads North
Princeton
Street
Rehabilita3on
Project
including
storm
sewer
and
pavement
replacement 










3,500,000
 39
Princeton MN Water North
End
Watermain
Looping‐
Fire
Protec3on
and
Supply 










3,500,000
 39
Princeton MN Water Wastewater
Treatment
Plant
Expansion 








18,000,000
 200
Richfield MN CDBG Construc3on
of
a
new
Police/Fire/City
Hall
facility
to
replace
a
1960's
era
deficient
building.
The
new
facility

will
significantly
improve
indoor
air
quality,
increase
efficiency
of
opera3ng
systems
&
incorporate
sustainable

strategies. 








22,250,000
 250
Richfield MN Streets/Roads 77th
Street
and
Colfax
Avenue
Traffic
Signal
‐
the
objec3ve
of
this
project
is
to
provide
improved
access
to
a

major
shopping
center
in
Richfield. 












250,000
 7
Richfield MN Streets/Roads Countdown
Timers
on
Pedestrian
Signals
‐
to
provide
pedestrian
countdown
3mers
on
the
City's
signals

improving
safety
for
pedestrians.

Countdown
3mers
will
be
required
at
all
signals
that
accommodate

pedestrians
within
ten
years. 












360,000
 12
Richfield MN Streets/Roads Richfield
Parkway
‐
to
provide
a
"complete
street"
network
improving
access
between
Richfield
and
South

Minneapolis.

The
roadway
would
provide
the
link
to
the
Three
Rivers
Park
Regional
Trail
and
Cedar
Avenue

Trail
to
the
Minneapolis
Grand
Rounds. 










3,000,000
 58
Richfield MN Streets/Roads 77th
Street
Underpass
‐
to
provide
local
and
regional
access
between
Richfield,
the
Interna3onal
Airport,
City

of
Bloomington,
and
the
Mall
of
America.

Con3nuing
77th
Street
to
the
east
would
create
a
successful
and

viable
I‐494
reliever/frontage
road, 








20,000,000
 680
Rosemount MN Streets/Roads TH
3
at
145th
Street
and
143rd
Street‐install
new
signal
system
and
add
turn
lanes
on
state
highway. 












400,000
 30
Rosemount MN Streets/Roads TH
3
at
Canada
Avenue‐Add
turn
lanes
on
state
highway
for
safety
improvements. 












430,000
 30
Rosemount MN Streets/Roads Boulder
Path
Extension‐2700
linear
foot
collector
road
extension
with
u3li3es. 










1,500,000
 50
Rosemount MN Streets/Roads Biscayne
Avenue
‐
Boulder
Trail
to
CSAH
46‐4000
linear
foot
collector
road
upgrade
from
gravel
to
urban
paved

street
sec3on
with
u3li3es. 










2,200,000
 75
Rosemount MN Streets/Roads CSAH
73
‐
CSAH
42
to
Bonaire
Path‐1
mile
of
county
road
upgrade
from
gravel
to
urban
paved
street
sec3on

with
u3li3es. 










3,700,000
 100
Rosemount MN Transit Downtown
Park
and
Ride
lot
construc3on
for
bus
transit
service
within
the
city
of
Rosemount. 












385,000
 40
Rosemount MN Water Northwest
Water
Treatment
Plant
Construc3on
‐
development
of
new
water
treatment
plant. 








10,000,000
 250
Roseville MN CDBG community
building
at
Arboretum 










1,500,000
 30
Roseville MN CDBG 4
neighborhood
centers
at
Parks 










2,000,000
 40
Roseville MN CDBG replace
clubhouse
and
maintenance
shop
at
Golf
Course 










1,500,000
 40
Roseville MN Energy Geothermal
energy
expansion
to
city
center
campus 










2,000,000
 50
Roseville MN Public
Safety The
Roseville
Police
Department
is
reques3ng
funds
to
add
a
dedicated
commercial
patrol
officer
to
its
roster.
The
City
of
Roseville
is
home
to
a
large
number
of
shopping
areas‐‐the
largest
center
being
Rosedale
(the
2nd

largest
mall
in
Minnesota
with
o 












120,000
 1
Roseville MN Streets/Roads
Roseville MN Streets/Roads Twin
Lakes
Parkway
construc3on
to
provide
a
regional
link
to
interstate
highway
system 








15,000,000
 500
Roseville MN Water water
and
wastewater
mainline
replacement
and
rehabilita3on 










2,000,000
 50
Shorewood MN CDBG Lake
Mary
storm
water
and
flood
mi3ga3on 












500,000
 5
Shorewood MN CDBG Park
shelter
and
warming
house
reconstruc3on 












250,000
 10
Shorewood MN CDBG Tennis
court
improvement
and
rehabilitatoin 












300,000
 10
Shorewood MN CDBG Municipal
road
reconstruc3on 










1,500,000
 15
Shorewood MN CDBG Wet
Land
Restora3on
and
educa3on
center 












600,000
 15
Silver
Creek MN CDBG Cur3s
Avenue
Reconstruc3on 












500,000
 3
Silver
Creek MN CDBG Barton
Avenue
Reconstruc3on 












500,000
 4
Silver
Creek MN CDBG 155th
Street
Reconstruc3on 












700,000
 5
Silver
Creek MN CDBG 127th
Street
Reconstruc3on 












800,000
 6
St.
Augusta MN Streets/Roads Realign
43rd
Avenue
and
County
Road
136 












150,000
 10
St.
Augusta MN Water Drill
Well
 












200,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
St.
Cloud MN Airport Jet
Bridge
for
St.
Cloud
Regional
Airport
Terminal
Building 












600,000
 8
St.
Cloud MN Airport Inset
pavement
ligh3ng
at
St.
Cloud
Regional
Airport 










1,500,000
 19
St.
Cloud MN CDBG University
Drive
Boulevard
Beau3fica3on
Project 












150,000
 2
St.
Cloud MN CDBG East
Lake
Boulevard
Project 












500,000
 6
St.
Cloud MN CDBG Skate
Plaza
Improvement 












750,000
 9
St.
Cloud MN CDBG Breckenridge
and
Cooper
Avenue
Trail
Connec3on
to
Lake
Wobegon
Trail 












800,000
 10
St.
Cloud MN CDBG 10th
Avenue
North
Area
Neighborhood
Rehabilita3on 










1,800,000
 23
St.
Cloud MN CDBG 10th
Avenue
North
Area
Neighborhood
Rehabilita3on
‐
Phase
2 










3,750,000
 40
St.
Cloud MN CDBG 22nd
Avenue
North
Neighborhood
Rehabilita3on 










4,500,000
 45
St.
Cloud MN Energy Emergency
Standby
Generator
for
Central
Maintenance
Facility 












115,000
 2
St.
Cloud MN Energy Energy
efficient
window
upgrade
to
City
Hall
Building
with
Atrium 












130,000
 2
St.
Cloud MN Energy HVAC
Control
for
City
Hall
Building 














70,000
 2
St.
Cloud MN Energy Geo‐Thermo
Heat
System
for
Central
Maintenance
Facility 












400,000
 5
St.
Cloud MN Energy Boiler
and
Roof
Replacement
‐
Wastewater
Treatment
Facility 










1,860,000
 23
St.
Cloud MN Energy UV‐Disinfec3on
and
Emergency
Generator
Project
‐
Wastewater
Treatment
Facility 










8,661,000
 108
St.
Cloud MN Streets/Roads Intersec3on
of
9th
Ave
S
(Route
145)
and
16th
St
S
(Route
129)
‐
Signal
system
upgrade
including
system

controller,
video
detec3on
and
pedestrian
countdown
3mers 












100,000
 2
St.
Cloud MN Streets/Roads State
Aid
Route
132
(25th
Ave)
‐
1st
St
N
to
3rd
St
N
‐
Par3al
depth
mill
and
overlay 












100,000
 2
St.
Cloud MN Streets/Roads Street
name
upgrade
program 












150,000
 2
St.
Cloud MN Streets/Roads Intersec3on
of
25th
Ave
N
(Route
132)
and
3rd
St
N
(Route
135)
‐
Full
signal
system
replacement 












215,000
 3
St.
Cloud MN Streets/Roads Intersec3on
of
7th
Ave
S
(Route
110)
and
1st
St
S
(Route
118)
‐
Full
signal
system
replacement 












215,000
 3
St.
Cloud MN Streets/Roads State
Aid
Route
123
(Washington
Memorial
Drive)
‐
11th
St
S
to
CSAH
75
‐
Full
reconstruc3on
of
roadway 












320,000
 4
St.
Cloud MN Streets/Roads State
Aid
Route
145
(9th
Ave)
‐
8th
St
N
to
15th
St
N
‐
full
depth
mill
and
reconstruc3on
of
asphalt
surface 












650,000
 8
St.
Cloud MN Water 54th
and
38th
Avenue
Interceptor 












190,000
 3
St.
Cloud MN Water Lincoln
Avenue
Rehabilita3on/Lining
Project 












246,000
 3
St.
Cloud MN Water Main
Forcemain
Inspec3on 












150,000
 3
St.
Cloud MN Water Collec3on
System
SCADA
Programming
&
Installa3on 












300,000
 4
St.
Cloud MN Water Upper
Pan
Interceptor
Lining
Project 












840,000
 11
St.
Cloud MN Water Northway
Libsta3on
Rehabilita3on 










1,300,000
 16
St.
Cloud MN Water Metro
Interceptor
Rehabilita3on
Project 










1,500,000
 19
St.
Cloud MN Water Lower
Pan
Interceptor
Lining
Project 










2,000,000
 25
St.
Cloud MN Water Vacuum
Pump
Libsta3on
Replacements
(5) 










2,000,000
 25
St.
Cloud MN Water Water
Treatment
Facility
Rehabilita3on
and
Improvement
Project 










5,825,000
 70
St.
Louis
Park MN Energy Street
Light
Project
M‐XX10
‐
System
Replacement.

This
project
would
replace
the
street
light
systems
which

have
reached
their
life
expectancy.

It
would
also
achieve
energy
efficiencies
by
replacing
all
high
pressure

sodium
fixtures
in
the
city's
street 










5,058,886
 50
St.
Louis
Park MN Streets/Roads Traffic
signals
‐
pain3ng
and
rou3ne
maintenance 














49,220
 5
St.
Louis
Park MN Streets/Roads Street
Projects
‐
maintenance,
rehabilita3on
and
reconstruc3on
of
city
and
MSA
streets 










2,771,303
 60
St.
Louis
Park MN Streets/Roads This
request
is
for
$9.2
million

to
construct
a
$20
million
grade
separated
intersec3on
at
Minnesota
State

Highway
7
and
Wooddale
Avenue
in
St.
Louis
Park,
Minnesota.
 










9,200,000
 200
St.
Louis
Park MN Transit Bus
Shelter
Project
M‐XX12
‐
Shelter
Replacements.

Three
aging
bus
shelters
have
reached
their
life

expectancy
and
need
to
be
replaced. 














48,966
 5
St.
Louis
Park MN Water Sanitary
Sewer
Project
‐
Mainline
Rehab:

This
work
consists
of
open
cut
replacement
or
trenchless
repair
of

defec3ve
sanitary
sewer, 












110,000
 5
St.
Louis
Park MN Water Sanitary
Sewer
Project
‐
Mainline
Rehab:
open
cut
replacement
or
trechnless
repair
of
sanitary
sewer. 












170,000
 5
St.
Louis
Park MN Water Sanitary
Sewer
Project
‐
Mainline
Rehab:
open
cut
replacement
or
trenchless
repair
of
sanitary
sewer 












110,000
 5
St.
Louis
Park MN Water Sanitary
Sewer
Project
‐
Mainline
Rehab:
open
cut
replacement
or
trenchless
repair
of
sanitary
sewer. 














69,795
 5
St.
Louis
Park MN Water Sanitary
Sewer
Project
‐
open
cut
replacement
or
trenchless
repair
of
defec3ve
sanitary
sewer. 












166,198
 5
St.
Louis
Park MN Water Watermain
Replacement.

This
work
involves
the
replacement
of
watermain,
hydrants,
and
valves
at
various

loca3ons
in
area
5. 












765,000
 5
St.
Louis
Park MN Water Storm
Water
Project
‐
Annual
Catch
Basin
Repairs:
This
work
involves
the
construc3on
of
deteriorated
storm

sewer
catch
basins
in
chipseal
areas
in
order
to
maintain
the
systems
to
a
serviceable
condi3ons. 












200,000
 8
St.
Louis
Park MN Water Storm
Water
Project
‐
Lib
Sta3on
6:
This
work
involves
the
rehabilita3on
or
replacement
of
Storm
Sewer
Lib

Sta3on
#6
which
has
reached
its
life
expectancy. 












400,000
 8
St.
Louis
Park MN Water Water
Project
‐
Security
Improvements.

This
work
involves
the
installa3on
of
fencing
and
alarm
systems
at
the

City's
water
treatment
facili3es. 












100,000
 8
St.
Louis
Park MN Water Sanitary
Sewer
Project
‐
Lib
Sta3on
17
and
Forecemain
Rehab.

This
works
consists
of
the
reconstruc3on
of

sanitary
Lib
Sta3on
#17
and
rehabilita3on
of
the
adjacent
forcemain.

The
new
installa3on
will
be
a

submersible
sta3on
which
will
re 












282,500
 10
St.
Louis
Park MN Water Sanitary
Sewer
Project
‐
Lib
Sta3on
3
and
Forcemain
Rehabilita3on.

This
work
consists
of
the
rehabilita3on

(new
pumps
and
controls)
of
Lib
Sta3on
#3
and
forcemain 












475,000
 10
St.
Louis
Park MN Water Water
Treatment
Plan
Adjustable
Speed
Drive
(VFD)
Pump
Upgrades.

This
work
involves
adding
the
balance
of

missing
adjustable
speed
drive
(VFD's)
to
the
high
service
pumps
at
city
Water
Treatment
Plants. 












150,000
 10
St.
Louis
Park MN Water Water
Treatment
Plant
#1
Filter
Rehabilita3on.

This
project
consists
of
the
removal
and
replacement
of
Water

Treatment
Plan
filter
media,
filter
vessel
rehabilita3on,
the
addi3on
of
air
scour
equipment
and
chemical
feed.

This 












895,000
 20
St.
Louis
Park MN Water Water
Treatment
Plan
#6
Granular
Ac3vated
Carbon
Upgrade.

This
project
consists
of
the
rehabilita3on
and

expansion/upgrade
of
Water
Treatment
Plan
#
with
GAC
capability
to
remove
radium
and
PAH
contaminants

from
the
groundwater 










3,500,000
 35
St.
Louis
Park MN Water Water
Project
‐
Replace/Upgrade
Residen3al
Meters.

This
project
consists
of
the
replacement
of
about
12,800

residen3al
water
meters
which
are
over
15
years
old
in
conjunc3on
with
the
purchase
and
installa3on
of
radio

read
equipment
and
sobware
for
a 










3,500,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
St.
Paul MN CDBG Arlington
Library
and
Recrea3on
Center
(Miracle
Center)
Public
Private
Partnership
‐
Saint
Paul
is
looking
to

bring
state
of
the
art
sustainability
to
reduce
opera3ng
costs
and
provide
green
learning,
and
in
doing
so,

revitalize
a
neighborhood
 










9,000,000
 300
St.
Paul MN CDBG Cleveland
Circle
‐
$40
million
is
requested
to
fund
construc3on
of
Phase
I
expansion
of
the
Minnesota
Event

District.*
Phase
I
expansion
includes
a
state
of
the
art,
community
ice
facility
of
excellence
which
will

incorporate
youth
ac3vi3es 








40,000,000
 300
St.
Paul MN Streets/Roads Channel
Street
Stairs
(“The
Green
Stairs”)
Reconstruc3on
‐
The
proposed
Channel
Street
Stairs
project

reconstructs
the
90
year
old,
90
foot
tall
steel
stairway
tower,
which
is
a
vital
pedestrian
link
between
the

Prospect
Park
neighborhood,
Wabasha
Street 










2,000,000
 80
St.
Paul MN Streets/Roads Payne
Avenue
–
Edgerton
Street
to
Bush
Avenue
‐
Proposed
funding
would
allow
for
the
reconstruc3on
of

roadway
including
traffic
calming
elements,
sidewalks
and
street
ligh3ng.

The
exis3ng
pavement
is
over
75

years
old
and
is
badly
deteriorated.

 










1,300,000
 180
St.
Paul MN Streets/Roads Western
Ave
–
Selby
to
University
‐
Reconstruct
roadway
including
bike
facili3es,
traffic
calming
elements,
and

street
ligh3ng.
Public
Art
St.
Paul
and
the
affected
community
groups
have
completed
planning
on
the
project

and
support
it.
 










2,100,000
 180
St.
Paul MN Transit Central
Corridor
Light
Rail
Transit
(CCLRT)
‐
The
Central
Corridor
Development
Strategy,
an
element
of
the
Saint

Paul
Comprehensive
Plan,
calls
for
the
construc3on
of
a
downtown‐scale
tower
above
and
around
the
transit

line
on
the
block, 








10,000,000
 200
Staples MN Public
Safety Fiber
Op3c
Backbone.

Construc3on
of
fiber
backbone
throughout
community.

Collabora3ve
project
between

City
of
Staples,
Central
Lakes
College,
School
District
and
Lakewood
Health
System. 












800,000
 12
Staples MN Schools Upgrade
Outdated
Internet
and
Telecommunica3ons
Internal
Infrastructure
Backbone 












175,000
 10
Staples MN Schools Replace
Single
Pane
Window
with
High
Efficient
Mul3
Pane
Windows 












569,000
 155
Staples MN Schools Electric
Wind
Genera3on
a
School's

Agricultural
Farm,
Biomass
Boiler
at
High
School,
Solar
Power
Atop
Each

Building











1,100,000
 259
Staples MN Schools Insulate
and
Repair
Leaking
Roofs
on
Each
of
School's
Buildings 










4,097,000
 600
Staples MN Streets/Roads 12th
Street
&
Wright
Avenue
Paving.

Paving
of
approximately
2,
050
feet
of
new
roadway
in
new
commercial

development
area
along
US
10
in
Staples 












110,000
 6
Staples MN Streets/Roads North/South
Corridor
with
Railroad
Overpass
Project.

Construc3on
of
approximately
8500
feet
of
roadway
and

a
bridge
over
the
busy
BNSF
railroad
corridor.

Crossings
are
currently
blocked
3.5
to
5
hours
per
day,
crea3ng

major
safety
concerns. 










6,500,000
 51
Clayton MO Public
Safety Fire
Dept
Ladder
Truck 










1,039,599
 0
Clayton MO Public
Safety Signal
Pre‐Emp3on
Project 














20,000
 5
Clayton MO Public
Safety City
Hall
Security
System 














15,000
 6
Clayton MO Streets/Roads Crack
Sealing 












225,000
 5
Clayton MO Streets/Roads CBD
Streetscape
Sidewalk
Caulking 














36,300
 6
Clayton MO Streets/Roads Sidewalk
Repairs 












150,000
 6
Clayton MO Streets/Roads Streetscape
Light
Pain3ng 














60,000
 6
Clayton MO Streets/Roads Wydown
Irriga3on 












270,000
 6
Clayton MO Streets/Roads Curb
and
Gufer
Repairs 














90,000
 8
Clayton MO Streets/Roads Reloca3on
of
Electric
U3li3es
along
Gay
Ave 










1,500,000
 8
Clayton MO Streets/Roads Alley
Improvements 












468,819
 10
Clayton MO Streets/Roads Microsurfacing 












658,447
 10
Clayton MO Streets/Roads Turn
Lane
on
Maryland
Ave
&
Resignaliza3n
at
Gay
Ave 












600,000
 12
Clayton MO Streets/Roads Widening
Topton
Ave
&
Resignaliza3on
at
Maryland
Ave 












450,000
 12
Clayton MO Streets/Roads Cecil
Ave
Reconstruc3on 












154,600
 14
Clayton MO Streets/Roads Resurfacing
Davis
Place
Subd 












455,785
 14
Clayton MO Streets/Roads Widening/Realignment
of
Gay
Ave 










2,100,000
 25
Clayton MO Water Storm/Sanitary
Sewer
Reloca3on
along
Gay
Ave 










1,200,000
 8
Clayton MO Water Oak
Knoll
Park
Stormwater
Project 












360,000
 14
Clayton MO Water New
Stormwater
Deten3on
Structure
for
Brown
Shoe
Site 












900,000
 15
Columbia MO Airport Locate
a
CFD
crash
truck
at
airport
to
augment
exis3ng
equipment 










1,500,000
 3
Columbia MO Airport Addi3onal
Apron
Capacity 










2,200,000
 5
Columbia MO Airport T‐Hangers
for
General
Avia3on 










2,000,000
 5
Columbia MO Airport Crosswind
Runway
Rehabilita3on 












171,414
 6
Columbia MO Airport Primary
Runway
Repairs 












239,148
 7
Columbia MO Airport Taxiway
A
Repairs 












382,191
 8
Columbia MO Airport Taxiway
B
Rehabilita3on 












115,637
 8
Columbia MO CDBG Douglass
Park
Security
Camera
System 












100,000
 5
Columbia MO CDBG Street
Reconstruc3on‐10
Miles
in
Old
Town 










1,000,000
 10
Columbia MO CDBG Playground
equipment
replacement 












650,000
 15
Columbia MO Energy Emergency
generator
retrofits
at
Sta3on
2
and
7 












100,000
 1
Columbia MO Energy energy
projects
at
Fire
Sta3on
4,
5
and
6 












300,000
 2
Columbia MO Energy Replace
2,738
Mercury/Vapor
Street
Lights
with
LED
Lights 










3,753,798
 2
Columbia MO Energy Commercial
Energy
Efficiency‐Reduce
Building
Energy
Usage 












500,000
 3
Columbia MO Energy Energy
Efficiency
Data
Base‐Track
Energy
Savings 












500,000
 3
Columbia MO Energy Solar
Water
Tank
Mixers‐Water
Mixing
Unit 










2,000,000
 3
Columbia MO Energy Low‐Income
Energy
Star
Homes 












500,000
 5
Columbia MO Energy Solar
Energy
Development‐Increase
Use
of
Solar
Energy 












400,000
 7
Columbia MO Public
Safety Armored
Vehicle‐Rescue
Use
and
Homeland
Security 












300,000
 0
Columbia MO Public
Safety Hazardous
Device
Unit
(bomb
squad)
equipment 












100,000
 0
Columbia MO Public
Safety Two
(2)
Police
Cruisers 














80,000
 0
Columbia MO Public
Safety Four
(4)
Police
Officers 












250,000
 4
Columbia MO Public
Safety Modernize
Fire
Sta3ons
4‐6 










1,600,000
 18
City State Program Project
Descrip3on Funding
Required Jobs
Columbia MO Streets/Roads Street;

Intersec3on
&
Sidewalk
Reconstruc3on 








35,000,000
 10
Columbia MO Streets/Roads Discovery
Parkway
(Hwy.
63‐Rolling
Hills
Road) 










4,000,000
 20
Columbia MO Streets/Roads Construct
Railroad
Overpass‐Hwy.
63
Safety
Problem;

state,
county,
city 










9,000,000
 25
Columbia MO Transit Bus
Replacement
Nine
(9) 










3,000,000
 20
Columbia MO Water Chlorammona3on
Equipment‐3
Systems 










1,200,000
 0
Columbia MO Water Chlorine
Analyzers‐Measures
Chlorine
Levels 














40,000
 0
Columbia MO Water VFD‐Speed
Equipment 










1,500,000
 0
Columbia MO Water Gas
Chlorina3on
System
Conversion 










1,500,000
 3
Columbia MO Water Mezzanine
Level
Catwalk‐Water
Plant
and
West
Ash
Pumping
Sta3ons 












300,000
 3
Columbia MO Water Sludge
Storage
Area 












750,000
 3
Columbia MO Water Emergency
Backup
Diesel
Generators 










1,500,000
 5
Columbia MO Water Emergency
Backup
Diesel
Generators 










1,500,000
 5
Columbia MO Water Aerators‐Water
Treatment
Equipment 












600,000
 6
Columbia MO Water ASR
Conversion
of
Exis3ng
Deep
Well 












475,000
 6
Columbia MO Water Drilling
Alluvial
Wells‐add'l
supply
wells 










1,500,000
 6
Columbia MO Water Gans
Creek
Pump
Sta3on 










2,100,000
 7
Columbia MO Water Midway
Sewer
Extension 










1,600,000
 7
Columbia MO Water North
Grindstone
Extension
Route
Z‐Industrial
Park
(sewer) 










1,300,000
 7
Columbia MO Water Upper
Hinkson
Creek
Ouzall
Extension
Phase
2 










3,000,000
 7
Columbia MO Water Business
Loop
70‐Phase
5‐3,800'
Main
Replacement 










1,045,000
 12
Columbia MO Water Concrete
Floor
in
Water
Treatment
Lagoons 










3,000,000
 14
Ellisville MO Streets/Roads Hilltop
Road
requires
new
concrete
curb
and
gufer,
complete
asphalt
street
removal
and
replacement
and

new
storm
sewer
systems.

U3lity
reloca3ons
will
be
required
to
accommodate
the
road
improvements.


 












520,000
 10
Ellisville MO Streets/Roads Fairview
Lane
requires
complete
removal
and
replacement
with
the
associated
storm
sewer
improvements.


Potholes
and
storm
water
backs
are
frequent
as
a
result
of
aging
infrastructure.
 












600,000
 12
Ellisville MO Streets/Roads Complete
street
replacement
and
storm
water
improvements
for
Debula
Dr.
The
aging
infrastructure
has

created
public
nuisances
such
as
standing
water,
water
back‐ups
and
cracked
pavement. 












390,250
 15
Ellisville MO Streets/Roads Complete
street
replacement
and
storm
water
improvements
for
Vero
Lane.

The
storm
water
sewers
are

failing,
crea3ng
pavement
seflement
and
cracking. 












782,500
 15
Ellisville MO Streets/Roads The
proposed
project
addresses
the
concrete
street
deficiencies
throughout
the
City
of
Ellisville
street
network

ranging
from
total
removal
and
replacement
of
the
street
segments
to
spot
slab
removal
and
replacement.


The
majority
of
the
pavement
failure
 










1,450,000
 50
Florissant MO CDBG Ice
Rink
Enclosure
at
the
Florissant
Eagan
Civic
Center. 












500,000
 25
Florissant MO CDBG Paddock
Creek
Bank
Stabiliza3on
Project. 










2,250,000
 50
Florissant MO CDBG Construc3on
of
a
new
municipal
Golf
Course
Maintenance
Building. 










1,100,000
 60
Florissant MO CDBG Boy/Girl
Scout
Camping
Area
and
Amphitheater
in
Sunset
Park. 










2,100,000
 65
Florissant MO CDBG Lindbergh
Boulevard/North
Highway
67
Cooridor
Enhancement
Project
Phase
III 










2,250,000
 75
Florissant MO CDBG Construc3on
of
a
new
Health
Department
Building
and
Kennel
for
the
City
of
Florissant. 










1,500,000
 100
Florissant MO CDBG Construc3on
of
a
new
Senior
Center
for
the
City
of
Florissant. 










1,300,000
 110
Florissant MO CDBG Expansion
of
the
Lake
at
St.
Ferdinand
Park
with
renova3ons
to
the
Bockrath
Weise
House
(Historic
Site). 










3,700,000
 115
Florissant MO CDBG Construc3on
of
a
new
Park
Maintenance
Facility
for
the
City
of
Florissant. 










2,000,000
 120
Florissant MO CDBG Sunset
Park
Marina
on
the
Missouri
River
(Roadway,
Parking
Lot,
Boat
Ramp,
Docks,
Fueling
Sta3on,
Store,

Boat
Slips,
Rock
Jefy,
and
all
Applicable
U3li3es). 










9,400,000
 200
Florissant MO CDBG Construc3on
of
a
new
Cable
TV
and
IT
Building. 








15,000,000
 250
Florissant MO CDBG Mainstreet
Florissant
Old
Town
Redevelopment. 








15,000,000
 500
Florissant MO CDBG Old
Town
Florissant
Street
&
Storm
Water
Drainage
Improvement
Projects
(Phases
8
through
40). 








30,000,000
 2000
Florissant MO CDBG Construc3on
of
a
new
Music
Hall
of
Fame
Building
in
Historic
Old
Town
Florissant.

This
building
would
be
a

joint
venture
between
the
University
of
Missouri
at
St.
Louis
and
the
City
of
Florissant. 








35,000,000
 2200
Florissant MO CDBG Construc3on
of
a
new
Municipal
Court
Building
with
addi3onal
use
for
various
Boards
&
Commissions

Mee3ngs. 








40,000,000
 3000
Florissant MO Energy Golf
Course
Water
Reclama3on
Project. 










1,100,000
 35
Florissant MO Public
Safety Security
of
Public
Buildings
to
Include
Access
Control,
Bollards
and
Alarms. 












100,000
 3
Florissant MO Public
Safety Surveillance
Video
Network
to
Monitor
High
Crime
Areas
within
the
City
of
Florissant. 












400,000
 5
Florissant MO Public
Safety Development
of
a
Crime
Interdic3on
Unit
to
reduce
Violent
Crimes. 












450,000
 6
Jefferson
City MO Airport replace
ATCT 










3,000,000
 30
Jefferson
City MO CDBG curb
&
gufer
repair
‐
Old
Town 










1,000,000
 10
Jefferson
City MO CDBG sidewalk
repair
‐
Old
Town 










1,000,000
 10
Jefferson
City MO CDBG street
overlay
‐
10
miles
in
Old
Town 










1,000,000
 10
Jefferson
City MO CDBG storm
water
improvement
‐
Old
Town 










5,000,000
 50
Jefferson
City MO CDBG street
reconstruc3on
‐
2
miles
in
Old
Town 










5,000,000
 50
Jefferson
City MO Housing Dulle
Towers
mechanical
systems 










1,500,000
 15
Jefferson
City MO Housing 35
unit
public
housing
moderniza3on 










2,000,000
 20
Jefferson
City MO Public
Safety Communica3ons
center
upgrade,
reverse
911
&
equipment 












200,000
 2
Jefferson
City MO Public
Safety Building
security,
HVAC,
locker
room
renova3on,
entry
and
booking
area
renova3on 












300,000
 3
Jefferson
City MO Public
Safety Equipment
for
SWAT,
Accident
inves3ga3ons,
detec3ves,
patrol 












300,000
 3
Jefferson
City MO Public
Safety Outdoor
warning
sirens 










1,000,000
 10
Jefferson
City MO Public
Safety Replace
Animal
Shelter 










1,500,000
 15
Jefferson
City MO Streets/Roads Lafayefe
at
Stadium
intersec3on
improvements 












300,000
 3
Jefferson
City MO Streets/Roads Stadium
at
Southwest
Blvd
signal
and
lane
addi3on 












300,000
 3
Jefferson
City MO Streets/Roads Tanner
Bridge
at
Ellis
intersec3on
improvements 












500,000
 5
Jefferson
City MO Streets/Roads TE
nonmotorized‐
greenway 












600,000
 6
Jefferson
City MO Streets/Roads Jefferson
St
Ramp
improvements 










1,000,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Jefferson
City MO Streets/Roads E
McCarty
improvements 










5,000,000
 50
Jefferson
City MO Streets/Roads TE
nonmotorized‐Mo
River
ped
bridge 










6,000,000
 60
Jefferson
City MO Streets/Roads SMHC
street,
stormwater,
sanitary‐east
&
west 








12,000,000
 120
Jefferson
City MO Transit Facility
&
cm
improvements,
emergency
generator 










1,000,000
 10
Jefferson
City MO Transit Replace
buses/2009
replacement
schedule
&
equipment 










2,000,000
 20
Jefferson
City MO Water Basin
10
‐
St
Marys
&
Hwy
179
relief
sewer 










1,000,000
 10
Jefferson
City MO Water Frog
Hollow
and
Rock
Ridge
sanitary
sewer
extensions 










1,000,000
 10
Jefferson
City MO Water Hayselton
pump
sta3on 










1,000,000
 10
Jefferson
City MO Water Longview
and
Moreauview
sanitary
sewer
extensions 










1,000,000
 10
Jefferson
City MO Water Rickman‐Christy‐Tanner
sanitary
sewer
extension 










1,000,000
 10
Jefferson
City MO Water Mili3a‐Taos
sanitary
sewer
interconnect 










1,500,000
 15
Jefferson
City MO Water Algoa
area
and
industrial
park
collec3on
and
treatment 










8,000,000
 80
Kansas
City MO Airport Downtown
Airport
Relief
Well
and
Airfield
Dewatering
System
Rehabilita3on
‐
Replacement
of
relief
wells
as

required
to
maintain
the
integrity
of
permanent
airport
dewatering
system 










3,000,000
 36
Kansas
City MO Airport Flight
Informa3on
Displays
–
Install
new
technology
large
scale
informa3onal
displays
on
public
airport

approach
roadways 










3,000,000
 36
Kansas
City MO Airport KCI
Land
Acquisi3on
‐
Acquire
noise
impacted
land
as
indicated
in
latest
CFR
14
Part
150
Update 










4,000,000
 48
Kansas
City MO Airport Airfield
Snow
Removal
Equip.
&
ARFF
Apparatus
Maintenance
Facility
Addi3ons
‐
Expand
and
renovate
Fleet

Maintenance
Facility
in
order
to
facilitate
repair
and
maintenance
of
large
equipment
needed
for
snow

removal
opera3ons
on
the
pavements
used
by
comm 










5,000,000
 60
Kansas
City MO Airport Field
Maintenance
Facility
–

Rehabilitate
field
maintenance
facility
to
accommodate
increase
in
number
of

personnel 










6,000,000
 72
Kansas
City MO Airport Airfield
Pavement
Repairs
–
RW
1R/19L
&
RW
9/27‐Pavement
rehabilita3ons
to
extend
service
life
of
airfield

pavements 










7,000,000
 84
Kansas
City MO Airport Chilled
Water
System
Rehabilita3on
–

Replace
cooling
towers
and
underground
chilled
water
distribu3on

piping
for
the
three
passenger
terminal
buildings
at
KCI 










7,000,000
 84
Kansas
City MO Airport Runway
Safety
Area
Improvements
–
Relocate
thresholds
and
install
EMAS
at
the
Charles
B.
Wheeler

Downtown
Airport 








12,000,000
 144
Kansas
City MO Airport Terminal
Access
Roadway
Rehabilita3on
‐
Pavement
rehabilita3on
and
moderniza3on
of
the
public
access

roads
of
each
of
the
three
passenger
terminal
facili3es
–
including
ADA
access
and
bus
shelters
for
ground

transporta3on
passengers 








18,000,000
 216
Kansas
City MO CDBG Indian
Creek
Trail
‐
On
the
south
side
of
Indian
Creek
from
Lydia
to
the
Union
Pacific
Railroad
Tracks 












350,000
 5
Kansas
City MO CDBG Blue
River
Athle3c
Field
Trail
at
103rd
and
I‐435
‐
Connects
Blue
River
Trail
to
Alex
George
Lake
Trail














450,000
 6
Kansas
City MO CDBG Town
of
Kansas
Historical
Site
‐
For
construc3on
of
interpre3ve
fencing
around
the
historical
site 












650,000
 7
Kansas
City MO CDBG Sni‐A‐Bar
Bridge
–
Bridge
Replacement 












700,000
 8
Kansas
City MO CDBG Black
Archives
‐
Comple3on
of
Renova3ons
for
Black
Archives
18th
and
Vine
Area 












750,000
 9
Kansas
City MO CDBG Columbus
Park
‐
To
construct
infrastructure
for
urban
redevelopment
project 










1,000,000
 12
Kansas
City MO CDBG East
Village
Infrastructure
–
For
pubic
infrastructure
for
urban
redevelopment
program 










1,000,000
 12
Kansas
City MO CDBG Line
Creek/2nd
Creek
Trail
‐
For
construc3on
of
shared‐use
trail
in
Line
Creek
Valley 










1,000,000
 12
Kansas
City MO CDBG Tiffany
Springs
Road
‐
For
extending
Tiffany
Springs
Road
from
Tiffany
Hills
Sports
Park
to
Amity
Road 










1,000,000
 12
Kansas
City MO CDBG Red
Bridge
Road
Streetscape
–
For
streetscape
improvements 










1,100,000
 13
Kansas
City MO CDBG Van
Brundt
Trail
‐
For
construc3on
of
shared‐use
trail
to
connect
Brush
Creek
Trail
to
Linwood
Blvd 










1,200,000
 14
Kansas
City MO CDBG Maplewoods
Parkway
–
1‐52
to
Barry
Road
‐
For
acquisi3on
and
construc3on
of
widening
to
4‐lane
parkway

and
shared‐use
trail
 










1,300,000
 15
Kansas
City MO CDBG Hampton
Road
Bridge
–
Bridge
replacement 










1,500,000
 18
Kansas
City MO CDBG Street
Tree
Plan3ng
‐
For
plan3ng
13,000
trees
in
City
right‐of‐ways
as
a
climate
protec3on
measure 










1,500,000
 18
Kansas
City MO CDBG Congress
/
Prairie
View
Interchange
–
For
improving
intersec3on 










1,600,000
 19
Kansas
City MO CDBG St.
John
Avenue
–
To
construct
streetscape
improvements 










1,600,000
 19
Kansas
City MO CDBG Tiffany
Springs
Trails
‐
From
Tiffany
Springs
Parkway
to
Green
Hills
Road 










1,600,000
 19
Kansas
City MO CDBG Vivion
Trail
Phase
3
–
For
construc3on
of
shared‐use
trail
to
connect
exis3ng
trail
to
An3och
shopping
center 










1,800,000
 20
Kansas
City MO CDBG Precast
Culvert
in
Street
District
1
lot
‐
For
placing
a
long
concrete
culvert
in
the
ditch
that
separates
the
lot 










2,000,000
 24
Kansas
City MO CDBG Shoal
Creek
Parkway
‐
N.Woodland
to
Staley
High‐school‐
For
construc3on
of
parkway 










2,200,000
 25
Kansas
City MO CDBG Trolley
Track
Trail
‐
Connect
Indian
Creek
Greenway
Trail
to
Trolley
Track
Trail

 










2,400,000
 28
Kansas
City MO CDBG Barry
Road
‐
For
extending
Barry
Road
from
Boardwalk
to
Ambassador
Drive
 










2,500,000
 30
Kansas
City MO CDBG 96th
Street
and
Reinking
Bridge
‐
For
replacement
of
two
bridges
at
the
intersec3on
of
Reinking
and
96th

Street 










2,600,000
 31
Kansas
City MO CDBG Beacon
Hill
–
To
construct
infrastructure
for
urban
redevelopment
project 










2,615,000
 31
Kansas
City MO CDBG 135th
Street
Streetscape
–
To
construct
sidewalks
and
enhance
pedestrian
environment 










2,800,000
 33
Kansas
City MO CDBG Hickman
Mills
Housing
Demonstra3on
Project
–
En3re
block
housing
rehabilita3on
to
demonstrate
the
impact
 










3,000,000
 36
Kansas
City MO CDBG Ambassador
Road
from
Tiffany
Springs
Road
to
Tiffany
Springs
Parkway 










5,350,000
 39
Kansas
City MO CDBG 18th
and
Vine
Historic
District
‐
Rehabilita3on
of
Historic
Buildings
for
Economic
Development
in
Urban
Core
‐

Designed,
can
proceed
immediately 










3,500,000
 42
Kansas
City MO CDBG 22nd/23rd
Street,
Sec3on
1B
‐
Improvements
and
capacity
upgrades
on
22nd
Street
from
Bruce
R
Watkins

(US71)
to
Brooklyn
Ave. 










3,500,000
 42
Kansas
City MO CDBG Tiffany
Springs
Road
‐
For
extending
Tiffany
Springs
Road
from
Green
Hills
to
Hull
Avenue 










3,700,000
 45
Kansas
City MO CDBG Downtown
Streetscape
–
To
construct
streetscape
improvements 










4,000,000
 48
Kansas
City MO CDBG 18th
and
Vine
Museum
Facility
Improvements
‐
Expansion/Renova3on
of
Economic
Development
Project
in

Urban
Core 










4,200,000
 50
Kansas
City MO CDBG 87th
Street,
Phase
2
‐

Improvements
and
capacity
upgrades
on
87th
Street
from
Denver
Avenue
through
the
I‐
435
Interchange 










5,000,000
 60
Kansas
City MO CDBG Sidewalk
Projects
–
For
urban
core
sidewalk
repair
and
construc3on 










5,000,000
 60
Kansas
City MO CDBG Traffic
Control
Center
–
For
crea3on
of
a
central
command
center
to
control
traffic
flow
and
increase

efficiencies 










5,000,000
 60
City State Program Project
Descrip3on Funding
Required Jobs
Kansas
City MO CDBG Traffic
Signal
Interconnect
‐
For
interconnect
program 










5,000,000
 60
Kansas
City MO CDBG Waukomis
and
72nd
Street
–
For
extending
72nd
Street
to
Waukomis
and
then
improving
Waukomis
to
reduce

accidents 










5,000,000
 60
Kansas
City MO CDBG Westport
Triangle
‐
For
modifica3on
of
streets
and
signals
with
interconnec3on
of
the
Westport
Triangle
and

improved
pedestrian
safety 










5,000,000
 60
Kansas
City MO CDBG Skyview
Avenue
–
For
extending
Skyview
from
Tiffany
Springs
Parkway
to
Tiffany
Springs
Road
 










5,460,000
 66
Kansas
City MO CDBG City
Market
Improvements
‐Renova3on/Renova3on
of
Public
Market
Buildings 










5,700,000
 68
Kansas
City MO CDBG Street
Tree
Trimming
‐
For
tree
maintenance
of
exis3ng
forest
infrastructure 










6,000,000
 72
Kansas
City MO CDBG 18th
Street
Connector
‐
Roadway
improvements
linking
Urban
Core
Centers 










6,100,000
 73
Kansas
City MO CDBG Streetlight
Tree
Trimming
‐
For
tree
trimming
surrounding
streetlights 










7,500,000
 90
Kansas
City MO CDBG City
Hall
Building
Improvements
‐
To
construct
improvements 










8,000,000
 96
Kansas
City MO CDBG Shoal
Creek
Parkway
‐
N.96th
@
N.Eastern
Ave.to
N.
Brighton
Ave
‐
For
construc3on
of
parkway 










8,000,000
 96
Kansas
City MO CDBG Council
District
6
Aqua3c
Center
‐
For
construc3on
of
Aqua3c
Center 










9,000,000
 108
Kansas
City MO CDBG North
Oak
Corridor
Streetscape
–
To
construct
streetscape
improvements 










9,300,000
 111
Kansas
City MO CDBG Playground
Replacements
‐
For
playground
replacements
in
parks
citywide 










9,800,000
 117
Kansas
City MO CDBG Bridge
Rehabilita3on
‐
For
bridge
repair/rehabilita3on
citywide 








10,000,000
 120
Kansas
City MO CDBG Main
Street
Streetscape
–
For
streetscape
improvements
from
30th
Street
to
44th
Street 








10,000,000
 120
Kansas
City MO CDBG Municipal
Buildings
‐
For
municipal
building
rehabilita3on,
including
roof
repair,
HVAC,
etc. 








10,000,000
 120
Kansas
City MO CDBG Tiffany
Springs
Parkway
‐
For
extending
Tiffany
Springs
Parkway
from
Green
Hills
Road
to
course
entrance 








10,150,000
 121
Kansas
City MO CDBG Gower
at
64th
Street
‐
Street
and
Bridge
Improvements 








10,200,000
 122
Kansas
City MO CDBG Central
Region
Maintenance
Facility‐39th
and
Gillham
‐
For
construc3on
of
maintenance
facility
for
Park’s

Central
Region 








10,300,000
 123
Kansas
City MO CDBG Green
Hills
Road
‐
For
extending
Green
Hills
Road
from
152
Highway
to
Tiffany
Springs
Parkway 








10,740,000
 129
Kansas
City MO CDBG N.
Brighton
–
Vivion
to
58th
Street
‐For
widening
of
N.
Brighton
from
two
to
four
lanes 








11,600,000
 139
Kansas
City MO CDBG Troost
Bridge
and
Volker
Intersec3on
‐
Bridge
replacement
and
intersec3on
improvements 








12,000,000
 144
Kansas
City MO CDBG Chouteau
Parkway
–
Parvin
Road
to
210
Highway
‐
For
construc3on
of
parkway. 








13,000,000
 156
Kansas
City MO CDBG Northeast
Community
Center
‐
9th
and
Van
Brunt
‐
For
construc3on
of
Community
Center 








14,000,000
 168
Kansas
City MO CDBG Shoal
Creek
Parkway
‐
N.96th
to
N.
Woodland
‐
For
construc3on
of
parkway 








14,800,000
 177
Kansas
City MO CDBG KCI
Intermodal
BusinessCentre
Phase
II
–
Grading,
u3li3es
and
streets
for
industrial
warehousing
park 








15,000,000
 180
Kansas
City MO CDBG Central
U3lity
Plant
Improvements
–
To
replace
chillers
and
boilers
to
support
Aircrab
Overhaul
Base

infrastructure 








16,000,000
 192
Kansas
City MO CDBG Street
Resurfacing
‐
For
street
resurfacing
citywide 






100,000,000
 1200
Kansas
City MO Energy Park
Administra3on
Building
‐
Energy
upgrades
to
ligh3ng
and
HVAC 










1,000,000
 12
Kansas
City MO Energy 11th
and
Oak
Garage
Ligh3ng
‐
For
providing
new
energy
efficient
ligh3ng
and
ligh3ng
control
system
for

parking
garage 










1,300,000
 15
Kansas
City MO Energy Municipal
Auditorium
Exterior
Preserva3on
‐
For
cleaning,
repairing,
and
tuck
poin3ng
exterior
of
the
building 










3,800,000
 45
Kansas
City MO Public
Safety New
Police
Department
Helicopter
‐
For
purchasing
a
new
police
helicopter
to
replace
one
of
their
40‐year
old

copters 










6,000,000
 72
Kansas
City MO Streets/Roads W.
Front
Street
at
new
I‐29/35
Interchange
–
For
construc3on
of
roadway 










3,900,000
 46
Kansas
City MO Streets/Roads Barry
Road
and
I‐29
Phase
2
–
For
increased
traffic
efficiency 










5,000,000
 60
Kansas
City MO Streets/Roads Briarcliff
Parkway–
For
new
diamond
interchange
at
Highway
9 










5,000,000
 60
Kansas
City MO Streets/Roads Lou
Holland
Drive
and
Richards
Road
–
For
street
rehabilita3on 










5,000,000
 60
Kansas
City MO Streets/Roads Red
Bridge
Road
‐
Holmes
to
Blue
River
Road
‐
For
construc3on
of
roadway
and
bridge 










5,000,000
 60
Kansas
City MO Streets/Roads Forrester
Bridge
–
Bridge
replacement
into
the
West
Bofom/Central
Industrial
District
area 










5,700,000
 68
Kansas
City MO Streets/Roads Cookingham
Drive
and
Interna3onal
Circle
–
Four
lane
divided
highway
rehabilita3on 










6,000,000
 72
Kansas
City MO Streets/Roads 12th
Street
Viaduct
upper
deck
and
middle
deck–
For
resurfacing
this
bridge’s
middle
deck 










9,300,000
 111
Kansas
City MO Streets/Roads Tiffany
Springs
Parkway
Extension
‐For
an
extension
of
exis3ng
four‐lane
divided
parkway
to
the
west
of

Interstate
Highway
29 








10,000,000
 120
Kansas
City MO Streets/Roads Traffic
Signal
Interconnect
‐
For
crea3on
of
an
interconnect
system
to
create
traffic
flow
improvements
and

efficiencies 








11,000,000
 121
Kansas
City MO Streets/Roads NE
108th
and
I‐169
Interchange
‐
For
construc3on
of
Interchange 








10,250,000
 123
Kansas
City MO Streets/Roads NE
96th
and
I‐169
Interchange
‐
For
construc3on
of
Interchange 








10,250,000
 123
Kansas
City MO Streets/Roads Barry
Road,
Sec3on
2
–
Barry
Road
from
Conant
to
Potomac
and
Amity
Road
from
Barry
Road
to
M152
‐

Improvements
and
capacity
upgrades
to
Barry
Road
and
Amity
Road
as
well
as
replacing
the
Rush
Creek
Bridge

used
by
the
residents
of
KCMO
and
Weatherby
Lake 








13,400,000
 160
Kansas
City MO Streets/Roads Traffic
Signal
Projects
‐
For
crea3on
of
25
signal
improvements
and
construc3on
to
increase
traffic
efficiency

construc3on 








18,000,000
 216
Kansas
City MO Water 150
Highway
&
Bofs
Road
‐
For
increasing
capacity
and
efficiency
for
the
NNSA/Honeywell
loca3on
in
south

Kansas
City 








10,000,000
 120
Kansas
City MO Water Water
Facility
Projects
–
For
four
facility
improvement
projects 








10,500,000
 126
Kansas
City MO Water Water
Main
Replacements
–
For
construc3on
of
five
small
water
main
replacement
projects
for
increased

water
delivery
and
efficiency 








10,750,000
 129
Kansas
City MO Water Troost
at
Brush
Creek
transporta3on
project
‐
For
increasing
efficiency
near
the
Brush
Creek
Channel
project 








12,000,000
 144
Kansas
City MO Water Wastewater
Facility
Projects
‐
For
the
Turkey
Creek
Pump
Sta3on
and
White
aloe
Pump
Sta3on
rehab 








12,300,000
 147
Kansas
City MO Water Combined
Sewer
Separa3on
–
To
separate
combined
wastewater
and
stormwater
collec3on
system
at
the

Charles
B.
Wheeler
Downtown
Airport 








18,000,000
 216
Kansas
City MO Water Water
Stormwater
Projects
‐
For
improvements
to
Chouteau
and
Gardner
in
the
Industrial
Northeast
and

Central
Industrial
District
and
Troost/Paseo/Brush
Creek
Channel
storm
water
infrastructure 








38,700,000
 464
Kansas
City MO Water Sanitary
Sewer
Projects
City‐Wide
‐For
eight
sanitary
sewer
projects
throughout
Kansas
City 








67,500,000
 810
Pine
Lawn MO CDBG Construc3on
of
a
new
Public
Works
Maintenance
Building
for
the
City
of
Pine
Lawn 










5,000,000
 10
Pine
Lawn MO CDBG Installa3on
of
new
sidewalks
throughout
the
Cityof
Pine
Lawn 










2,500,000
 20
Pine
Lawn MO CDBG Construc3on
of
a
new
Community
Center
that
will
have
programs
for
the
elderly
and
youth 








23,000,000
 32
City State Program Project
Descrip3on Funding
Required Jobs
Pine
Lawn MO CDBG Construc3on
of
a
new
Government
Building
to
include
an
Emergency
Opera3ng
Center
for
the
City
of
Pine

Lawn 








45,000,000
 75
Pine
Lawn MO CDBG Mainstreet
Pine
Lawn
Development
for
the
City
of
Pine
Lawn 








78,000,000
 200
Pine
Lawn MO Public
Safety Purchase
5
addi3onal
Police
Cars
for
addi3onal
staff 












200,000
 2
Pine
Lawn MO Public
Safety Purchase
cameras
and
suppor3ng
recording
equipment
for
the
Police
Cars
and
Holding
Jail
area. 










2,300,000
 7
Pine
Lawn MO Public
Safety Hire
addi3onal
Police
and
suppor3ng
staff
to
patrol
the
city
streets
and
police
presence
at
the
schools. 












750,000
 10
St.
Louis MO Airport Noise
Monitoring
System
Upgrade 












500,000
 25
St.
Louis MO Airport Resurfacing
Taxiway
L
from
TWY
F7
to
TWY
F 












375,000
 25
St.
Louis MO Airport Environmental
Management
System 










1,500,000
 45
St.
Louis MO Airport North
Apron
Reconstruc3on 










5,200,000
 157
St.
Louis MO Airport Taxiway
E
Reconstruc3on‐‐Part
2 










6,700,000
 202
St.
Louis MO Airport Taxiway
V
Reconstruc3on‐‐Part
2 










8,500,000
 257
St.
Louis MO Airport Taxiway
D
Reconstruc3on 










8,800,000
 266
St.
Louis MO Airport Taxiway
E
Reconstruc3on‐‐Part
3 










9,000,000
 272
St.
Louis MO Airport Taxiway
E
Reconstruc3on‐‐Part
1 










9,200,000
 278
St.
Louis MO Airport Taxiway
V
Reconstruc3on‐‐Part
1 










9,700,000
 293
St.
Louis MO Airport Runway
Centerline
Panel
Replacement 








10,000,000
 302
St.
Louis MO Airport Taxiway
S
Reconstruc3on 








11,200,000
 338
St.
Louis MO CDBG Build
a
911
communica3on
center
with
radio
frequency
tower 










1,500,000
 50
St.
Louis MO CDBG Carver
School
Moderniza3on 










1,000,000
 30
St.
Louis MO CDBG Habitat
for
Humanity
Streetscape
Improvements 










1,000,000
 30
St.
Louis MO CDBG Habitat
for
Neighborhood
Business
Infrastructure/Energy
Enhancements 










1,000,000
 30
St.
Louis MO CDBG Handy
Park
Improvements 










1,000,000
 30
St.
Louis MO CDBG Park/Street
Enhancements
at
New
Animal
Care
Facility 










1,000,000
 30
St.
Louis MO CDBG North
Market
Place/Old
North
St.
Louis
Streetscape
Improvements 










1,300,000
 39
St.
Louis MO CDBG Grand
Center
Infrastructure/Safety
Improvements 










1,500,000
 45
St.
Louis MO CDBG Forest
Park
"Heels
&
Wheels"
Trail 










1,800,000
 54
St.
Louis MO CDBG Grandel
Theater
Moderniza3on 










1,950,000
 59
St.
Louis MO CDBG CORTEX
Life
Sciences
Business
Park
Site
Prepara3on 










2,000,000
 60
St.
Louis MO CDBG Delmar
Streetscape
Improvements‐‐Hodiamont
to
Goodfellow 










2,000,000
 60
St.
Louis MO CDBG Manchester
Pedestrian
Ligh3ng‐‐Kingshighway
to
Vandeventer 










2,000,000
 60
St.
Louis MO CDBG New
Park
Development 










2,000,000
 60
St.
Louis MO CDBG River
Des
Peres
Greenway
Extension‐‐Part
1 










2,000,000
 60
St.
Louis MO CDBG River
Des
Peres
Greenway
Extension‐‐Part
2 










2,000,000
 60
St.
Louis MO CDBG Adelaide
Business
Campus
stormwater
and
drainage 










2,000,000
 60.4
St.
Louis MO CDBG Hall
Street
Improvements 










2,000,000
 60.4
St.
Louis MO CDBG Forest
Park
Urban
Golf
Course
Renova3on 










2,100,000
 63
St.
Louis MO CDBG Grand
Center
Adap3ve
Church
Reuse‐‐Park/Exhibi3on
Space 










2,250,000
 68
St.
Louis MO CDBG Lafayefe
Square
Pedestrian
Ligh3ng 










2,500,000
 76
St.
Louis MO CDBG West
Florissant
Streetscape
Improvements‐‐I‐70
to
Adelaide 










2,500,000
 76
St.
Louis MO CDBG Macklind
Streetscape
Improvements‐‐Chippewa
to
Eichelberger 










3,000,000
 90
St.
Louis MO CDBG North
Kingshighway
Streetscape
Improvements‐‐Delmar
to
Dr.
MLK 










3,000,000
 90
St.
Louis MO CDBG Carrie
Avenue/Northside
Business
Park
Streetscape/Infrastructure 










3,000,000
 91
St.
Louis MO CDBG City
Hall
Historic
Renova3on‐‐Exterior
Cleaning 










3,000,000
 91
St.
Louis MO CDBG Dick
Gregory
Place
Infrastructure 










3,000,000
 91
St.
Louis MO CDBG Grand
Center
Performance
Green 










3,000,000
 91
St.
Louis MO CDBG I‐70/Goodfellow
Streetscape
Improvements 










3,000,000
 91
St.
Louis MO CDBG Meramec
Avenue
Streetscape
Improvements‐‐Grand
to
S.
Broadway 










3,000,000
 91
St.
Louis MO CDBG North
Grand
Avenue
Streetscape
Improvements‐‐Delmar
to
Dr.
MLK 










3,000,000
 91
St.
Louis MO CDBG North
Grand
Avenue
Streetscape
Improvements‐‐Water
Tower
District 










3,000,000
 91
St.
Louis MO CDBG Forest
Park
Bridge/Muny
Tributary
Replacement 










3,300,000
 100
St.
Louis MO CDBG Hyde
Park
Renova3on
Plan
Implementa3on 










3,700,000
 112
St.
Louis MO CDBG City
Hall
Historic
Renova3on‐‐Exterior
Repairs/Roofing/Ligh3ng 










4,000,000
 120
St.
Louis MO CDBG Dr.
Mar3n
Luther
King
Pedestrian
Ligh3ng‐‐Grand
to
Kinghsighway 










4,000,000
 120
St.
Louis MO CDBG Morganford
Streetscape
Improvements‐‐Arsenal
to
Chippewa 










4,000,000
 120
St.
Louis MO CDBG South
Grand
Streetscape
Improvements‐‐Arsenal
to
Gravois 










4,000,000
 120
St.
Louis MO CDBG West
Florissant
Streetscape
Improvements‐‐Riverview
to
I‐70 










4,000,000
 120
St.
Louis MO CDBG Mallinckrodt
Streetscape
Improvements 










4,000,000
 121
St.
Louis MO CDBG Sarah
Avenue
Streetscape
Improvements‐‐Vandeventer
to
Lindell 










4,000,000
 121
St.
Louis MO CDBG Locust
Streetscape
Improvements‐‐Tucker
to
Jefferson 










5,000,000
 133
St.
Louis MO CDBG Euclid
Avenue
Streetscape
Improvements‐‐Forest
Park
Parkway
to
Lindell 










4,500,000
 136
St.
Louis MO CDBG Chippewa
Streetscape‐‐Grand
to
South
Broadway 










5,000,000
 151
St.
Louis MO CDBG City
Hall
Historic
Renova3on‐‐Interior
Public
Spaces 










5,000,000
 151
St.
Louis MO CDBG Delmar
Streetscape
Improvements‐‐Tucker
to
Jefferson 










5,000,000
 151
St.
Louis MO CDBG Hall
Street
Drainage/Streetscape
Improvements 










5,000,000
 151
St.
Louis MO CDBG North
Broadway
Streetscape
Improvements 










5,000,000
 151
St.
Louis MO CDBG River
des
Peres
Streetscape/Drainage
Improvements 










5,000,000
 151
St.
Louis MO CDBG Skinker
Boulevard‐‐Delmar
to
Dr.
MLK 










5,000,000
 151
St.
Louis MO CDBG Arlington
Grove
Infrastructure‐‐Dr.
MLK,
Union,
Lotus,
City
Limits 










5,500,000
 166
St.
Louis MO CDBG Grand
Center
Streetscape
Improvements 










5,675,000
 171
City State Program Project
Descrip3on Funding
Required Jobs
St.
Louis MO CDBG Morganford
Streetscape
Improvements‐‐Chippewa
to
Holly
Hills 










6,000,000
 180
St.
Louis MO CDBG Laclede's
Landing
Cobblestone
Renova3on/Streetscape
Enhancements 










6,000,000
 181
St.
Louis MO CDBG Norville
Brown
Teen
Center
Renova3on/Construc3on 










6,500,000
 196
St.
Louis MO CDBG Soldiers
Memorial
Improvements 










7,000,000
 211
St.
Louis MO CDBG Various
Enhancements‐‐Non‐Arterial
Streets
throughout
City 










7,000,000
 211
St.
Louis MO CDBG North
Central
Plan
Infrastructure
Implementa3on‐‐Enright,
Page,
Vandeventer,
Sarah 










7,500,000
 227
St.
Louis MO CDBG Federal
Mogul
Acquisi3on/Site
Prepara3on 










7,700,000
 233
St.
Louis MO CDBG North
Kingshighway
Streetscape
Improvements‐‐Dr.
MLK
to
W.
Florissant 










8,000,000
 242
St.
Louis MO CDBG Parc
Pacific
Park
Enhancements/Event
Space 










9,000,000
 272
St.
Louis MO CDBG Various
Recrea3on
Center
Enhancements 










9,500,000
 287
St.
Louis MO CDBG North
Side
Recrea3on
Center 








10,000,000
 302
St.
Louis MO CDBG South
Broadway
Streetscape
Improvements‐‐Arsenal
to
Delor 








10,000,000
 302
St.
Louis MO CDBG South
Jefferson
Streetscape
Improvements‐‐Chouteau
to
Broadway 








10,000,000
 302
St.
Louis MO CDBG University
of
Missouri
St.
Louis
Public
Media
Educa3on
Center 








11,000,000
 332
St.
Louis MO CDBG Branch
Street
Trestle
Bicycle/Pedestrian
Trail
Extension 








15,000,000
 453
St.
Louis MO CDBG Natural
Bridge
Streetscape
Improvements‐‐N.
Florissant
to
N.
Kingshighway 








15,000,000
 453
St.
Louis MO CDBG VA
Hospital/Grand
Center
Retail/Parking
Structures 








19,750,000
 596
St.
Louis MO CDBG St.
Louis
Center
Retail/Parking
Conversion 








20,000,000
 604
St.
Louis MO CDBG Kiel
Retail/Parking
Structure
Development 








30,000,000
 906
St.
Louis MO CDBG Downtown/Central
Business
District
Streetscape
Improvements
(66
Blocks) 








33,000,000
 997
St.
Louis MO CDBG Gateway
Mall
Park
Enhancements 








50,000,000
 1510
St.
Louis MO CDBG Vandeventer/Southwest/Kingshighway
Streetscape 










1,000,000
 30
St.
Louis MO CDBG Terry
Park
Improvements 










1,500,000
 45
St.
Louis MO CDBG Michigan
Avenue
Streetscape
(E.
Davis
to
Schirmer) 










2,300,000
 69
St.
Louis MO CDBG Jamieson
Streetscape
Improvements
(Arsenal
to
Chippewa) 










3,000,000
 91
St.
Louis MO CDBG South
Broadway
Streetscape
(Courtois
to
Upton) 










3,000,000
 91
St.
Louis MO CDBG Gravois
Avenue
Streetscape
(Loughborough
to
Tab) 










6,500,000
 196
St.
Louis MO CDBG South
Kingshighway
Boulevard
Streetscape
(Christy
to
Southwest) 










8,000,000
 242
St.
Louis MO CDBG Center
for
Emerging
Technologies
Expansion 








10,000,000
 300
St.
Louis MO CDBG Main
Public
Library
Moderniza3on 








15,000,000
 450
St.
Louis MO CDBG Zoo
Improvements,
Various 








15,420,000
 462
St.
Louis MO CDBG Municipal
Dock
Repair/Replacement 








20,000,000
 604
St.
Louis MO Energy "Green"
Pedestrian
Ligh3ng
in
Area
of
I‐70,
W.
Florissant,
Riverview 










3,000,000
 91
St.
Louis MO Energy New
Energy‐EFficient
Street
Department/Equipment
Services
Building 








17,000,000
 540
St.
Louis MO Energy City
Hall
Renova3on‐‐Electrical
Moderniza3on 








25,000,000
 755
St.
Louis MO Energy Historic
Police
Headquarters
Energy
Enhancement/Retrofit 








25,000,000
 755
St.
Louis MO Energy City
Government
Recycling
Program
Expansion 










4,500,000

St.
Louis MO Energy City‐Wide
Single‐Family
Residen3al
Recycling
Program
Expansion 








18,000,000

St.
Louis MO Energy Replacement
of
Petroleum‐Fueled
City
Fleet
Vehicles
with/Energy
Efficient
Fuel
System
Vehicles 








41,700,000

St.
Louis MO Energy Reforesta3on
of
City
Parks 










6,500,000
 196
St.
Louis MO Energy Energy‐Efficient
Ligh3ng
Upgrades‐‐All
City
Facili3es 








10,000,000
 302
St.
Louis MO Energy City‐Owned
Buildling
HVAC
Energy
Efficient
Replacements/Upgrades 








20,000,000
 604
St.
Louis MO Energy Solar
Power
Augmenta3on
in
City‐Owned
Buildings
for
Green
Power
and
Peak
Load
Shedding
 








21,250,000
 642
St.
Louis MO Energy Conven3on
Center
LEED
Cer3fica3on
Repairs/Replacements/Enhancements 








51,245,000
 1548
St.
Louis MO Housing 6323
Minnesota 












225,000
 6.795
St.
Louis MO Housing 2821
Texas 












250,000
 7.55
St.
Louis MO Housing 3139
Ohio 












250,000
 7.55
St.
Louis MO Housing Aubert
Place 












350,000
 10.57
St.
Louis MO Housing 4557
Flad 












400,000
 12.08
St.
Louis MO Housing Cabanne
Homes
(AA) 












400,000
 12.08
St.
Louis MO Housing Riverview‐West
Florissant
Scafered
Sites 












490,000
 14.8
St.
Louis MO Housing 2801
Wyoming 












500,000
 15.1
St.
Louis MO Housing 3143
and
3145
Ohio 












500,000
 15.1
St.
Louis MO Housing 3324
Missouri 












500,000
 15.1
St.
Louis MO Housing King's
Estates 












600,000
 18.12
St.
Louis MO Housing Blue
Shufers
Historic
Homes 












650,000
 19.63
St.
Louis MO Housing Tower
Grove
East
Building
A
Neighborhood
of
Dreams 












650,000
 19.63
St.
Louis MO Housing Greater
Ville
Community
Center 












700,000
 21.14
St.
Louis MO Housing 5020,
5022,
5024
West
Florissant 












735,000
 22.2
St.
Louis MO Housing RHCDA/Community
Renewal
Affordable
Homes 












750,000
 22.65
St.
Louis MO Housing Cochran
Gardens
HOPE
VI
Inrastructure 










1,400,000
 42
St.
Louis MO Housing Arlington
Heights 










2,000,000
 60.4
St.
Louis MO Housing Ville
Estates 










2,000,000
 60.4
St.
Louis MO Housing Murphy
Park
Early
Childhood
Center 










9,600,000
 290
St.
Louis MO Public
Safety Purchase
a
911
Radio
Dispatch
and
Report
Wri3ng
System 












100,000
 12
St.
Louis MO Public
Safety New
Police
Evidence
Warehouse 










2,500,000
 76
St.
Louis MO Public
Safety Department
of
Public
Safety
Informa3on
Systems
Upgrades 










1,500,000

St.
Louis MO Public
Safety Consolidated
Public
Safety
Answering
Point 








20,000,000
 604
St.
Louis MO Schools St.
Louis
Public
School
Buildings‐‐Furnishings 










5,000,000
 10
St.
Louis MO Schools St.
Louis
Public
School
Buildings‐‐Site
Improvements 










9,800,000
 296
City State Program Project
Descrip3on Funding
Required Jobs
St.
Louis MO Schools St.
Louis
Public
School
Buildings‐‐School
Interior
Finishes 








14,800,000
 447
St.
Louis MO Schools St.
Louis
Public
School
Buildings‐‐Exterior
Enclosure
Repairs/Replacements 








23,000,000
 695
St.
Louis MO Schools St.
Louis
Public
School
Buildings‐‐Lead
Abatement/Remedia3on 








25,000,000
 752
St.
Louis MO Schools St.
Louis
Public
School
Buildings‐‐Plumbing
Upgrades/Replacements 








44,300,000
 1336
St.
Louis MO Schools St.
Louis
Public
School
Buildings‐‐Electrical
Upgrades 








52,300,000
 1579
St.
Louis MO Schools St.
Louis
Public
Schools‐‐Addi3onal
Interior/Exterior/Systems
Repairs/Replacements/Enhancements 










7,540,000
 228
St.
Louis MO Streets/Roads Manchester/McCausland
Traffic
Improvements 










1,000,000
 30
St.
Louis MO Streets/Roads Loughborough/I‐55
Bridge
Expansion 










1,500,000
 45
St.
Louis MO Streets/Roads Wellington
Bridge
Replacement 










3,000,000
 91
St.
Louis MO Streets/Roads Lafayefe/I‐55
Ramp
Reconfigura3on 










4,000,000
 121
St.
Louis MO Streets/Roads Skinker/McCausland/Clayton
Road/I‐64
Intersec3on
Improvements 










4,000,000
 121
St.
Louis MO Streets/Roads Off‐System
Preven3ve
Bridge/Road
Maintenance 










6,000,000
 180
St.
Louis MO Streets/Roads On‐System
Preven3ve
Bridge/Road
Maintenance 










6,000,000
 181
St.
Louis MO Streets/Roads On‐System
Preventa3ve
Maintenance 










6,000,000
 210
St.
Louis MO Streets/Roads Compton
Avenue
Bridge
Renova3on/Replacement 










7,000,000
 211
St.
Louis MO Streets/Roads I‐70/Mississippi
River
Bridge‐‐Extension
of
Cass/Bridge
Exit
Ramps
to
Tucker 










8,000,000
 242
St.
Louis MO Streets/Roads McCausland/Ellendale/Wabash
Traffic
Improvements 










8,000,000
 242
St.
Louis MO Streets/Roads Various
Traffic
Signal
Interconnects 








12,000,000
 360
St.
Louis MO Streets/Roads Arterial
Resurfacing/Enhancements‐‐Various
Streets 








15,000,000
 453
St.
Louis MO Streets/Roads S.
Kingshighway
Bridge
Replacement
at
Union
Pacific
Tracks 








17,000,000
 513
St.
Louis MO Streets/Roads Chestnut/I‐64
Interchange
Reconfigura3on 








29,000,000
 604
St.
Louis MO Streets/Roads Tucker
Avenue
Bridge
Replacement‐‐Cass
to
Washington 








35,000,000
 1057
St.
Louis MO Streets/Roads Regional
Wayfinding
Program 










1,000,000
 30
St.
Louis MO Streets/Roads I‐70
Mississippi
River
Bridge‐‐Extension
of
Cass/Bridge
Connec3on
to
Tucker/N.
Florissant,
Other
Companion

Street
Improvements 








15,000,000
 451
St.
Louis MO Transit Regional
Transit
Data
Infrastructure
Upgrade 










5,000,000
 151
St.
Louis MO Transit Transit
Rolling
Stock
Replacement 










5,000,000
 151
St.
Louis MO Transit Grand
Avenue
MetroLink
Sta3on
Upgrades/Grand
Avenue
Bridge 








16,550,000
 500
St.
Louis MO Transit Eads
MetroLink/Vehicular
Bridge
Rehabilita3on 








25,000,000
 755
St.
Louis MO Transit Fixed
Lane
Trolley
Development‐‐Serving
"Loop"/Washington
University 








35,000,000
 906
St.
Louis MO Transit Light
Rail
Rehabilita3on/Preven3ve
Maintenance‐‐Original
1993
Alignment 








45,000,000
 1359
St.
Louis MO Transit Transit
System
Opera3ng
Deficit 








50,000,000
 1510
St.
Louis MO Transit North/South
MetroLink
Extensions 






900,000,000
 20000
St.
Louis MO Water Kingshighway
and
Pipe
Yard
Facili3es
Improvements 












350,000
 13
St.
Louis MO Water Macklind
Ouzall
Separa3on/Other
Overflow
Improvements 










1,000,000
 30
St.
Louis MO Water Wharf
Street
Pump
Sta3on
Replacement 










1,000,000
 30
St.
Louis MO Water Bissell
Point
Treatment
Plant
Repairs/Improvements 










1,300,000
 39
St.
Louis MO Water Historic
Water
Tower
Renova3ons 










1,400,000
 42
St.
Louis MO Water Seismic
Bypass
at
Stacey
Park
Reservoir 










1,500,000
 45
St.
Louis MO Water Water
Main
Renova3ons 










1,500,000
 45
St.
Louis MO Water Water
Treatment
Plant
Improvements 










2,850,000
 86
St.
Louis MO Water Water
Distribu3on
System
Improvements 










3,500,000
 106
St.
Louis MO Water Floodwall
Repairs/Enhancements 








20,000,000
 604
St.
Louis MO Water "Green"
Alley
Reconstruc3on 








30,000,000
 906
St.
Louis MO Water Harlem‐Baden
Relief
Deten3on
System 








35,500,000
 1072
Wellston MO Public
Safety The
City
of
Wellston
would
like

to
hire
5
addi3onal
officers
and
obtain
3
police
cars.
This
would
enable
the
city

to
be
patroled
at
all
3mes. 












125,000
 5
Bay
Springs MS Airport Enviromental
Study
at
Thigpen
Field 














50,000
 12
Bay
Springs MS Airport Runway
Extension
at
Thigpen
Field 










1,800,000
 12
Bay
Springs MS CDBG 1,000
gpm
water
well 












500,000
 10
Bay
Springs MS CDBG Rework
Lib
Sta3ons
(13) 












650,000
 12
Bay
Springs MS CDBG 300,000
elevated
storage
tank 












650,000
 18
Bay
Springs MS CDBG Construct
East
Industrial
Park
Ave 












250,000
 45
Bay
Springs MS CDBG Construct
West
Industrial
Park
Ave 












250,000
 45
Bay
Springs MS Streets/Roads Overlay
East
1st
Street 














70,000
 25
Bay
Springs MS Streets/Roads Overlay
East
Eighth
Avenue 














70,000
 25
Bay
Springs MS Streets/Roads Widen
and
overlay
Ainsworth
Drive 












325,000
 35
Bay
Springs MS Streets/Roads Widen
and
overlay
Bayless
Drive 












250,000
 35
Bay
Springs MS Streets/Roads Widen
and
overlay
Commerce
Drive 












375,000
 35
Bay
Springs MS Streets/Roads Widen
and
overlay
Edmonton
king
Road 












625,000
 35
Bay
Springs MS Streets/Roads Widen
and
overlay
Henry
Road 












125,000
 35
Bay
Springs MS Streets/Roads Widen
and
overlay
Houston
Street 














35,000
 35
Bay
Springs MS Streets/Roads Construct
Reed
Drive 














60,000
 45
Bay
Springs MS Water Replacement
of
fire
hydrants
(60
each) 












180,000
 4
Bay
Springs MS Water pain3ng
of
300,000
gallon
elevated
water
tank 












150,000
 6
Bay
Springs MS Water Pain3ng
of
wastewater
treatment
plant 














65,000
 6
Bay
Springs MS Water Plug
and
abandon
old
water
wells 












150,000
 6
Bay
Springs MS Water Fire
protec3on
water
main
along
Hwy
18 














50,000
 8
Bay
Springs MS Water Fire
protec3on
water
main
along
Hwy
528 












125,000
 8
Bay
Springs MS Water Fire
protec3on
water
main
along
Hwy
531 














75,000
 8
City State Program Project
Descrip3on Funding
Required Jobs
Bay
Springs MS Water Grit
Chamber
for
wastewater
treatment 












150,000
 8
Bay
Springs MS Water Replace
sewer
on
5th
street 














35,000
 8
Bay
Springs MS Water Replace
sewer
at
intersec3on
of
Hwy
15
&
18 












100,000
 15
Belzoni MS CDBG Pedestrian
improvements
‐
ADA
accessibility
improvements,
repair,
and
reconstruc3on
of
town
sidewalk

network. 












375,000
 16
Belzoni MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
street
system. 










2,200,000
 28
Belzoni MS CDBG Water
and
sewer
improvements
‐
Replacement
and
repair
of
water
distribu3on
and
wastewater
collec3on
and

treatment
system
for
en3re
town. 










3,500,000
 30
Beulah MS CDBG Fire
Sta3on
‐
Renova3on
of
exis3ng
fire
sta3on
to
include
kitchen,
mee3ng
room,
and
ADA
accessibility. 














75,000
 8
Beulah MS CDBG Town
Hall
‐
Renova3on
of
exis3ng
Town
Hall
to
include
parking
and
ADA
accessibility. 












150,000
 10
Beulah MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 










1,600,000
 20
Beulah MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 










2,500,000
 28
Biloxi MS Streets/Roads Hickory
Hill
Circle
Water
Line
Replacement 












500,000
 20
Biloxi MS Streets/Roads Brodie
Road
Widening‐
including
future
water
services,
sanitary
sewer
improvements
and
drainage

improvements 










3,500,000
 50
Biloxi MS Streets/Roads Popp's
Ferry
Road
Extension
from
Pass
Road
to
Railroad
Tracks
‐
including
water,
sewer,
&
drainage 










6,000,000
 50
Biloxi MS Streets/Roads Rue
Pe3t
Bois
Phase
II
‐
includes
drainage
improvements
&
road
repairs
in
this
subdivision 










2,000,000
 50
Biloxi MS Streets/Roads Televise
sanitary
sewers
and
storm
drains
citywide
not
in
Katrina
surge
areas,
iden3fy
&
repair
damaged
lines

with
cured
in
place
piping 






100,000,000
 50
Coahoma MS CDBG Renovate
and
upgrade
library
&
resource
center
to
provide
following
services
and
ac3vi3es:
job
training
and

retraining,
broadband(
e
commerce,
community/economic
development,
educa3onal
enrichment,
etc.),
&

employment
readiness
ac3vi3es,
drop
out
pre 










1,000,000
 10
Coahoma MS CDBG Mul3‐purpose
structure
to
include
town
hall,
police
dept.,
parking
and
ADA
accessibiliity 












750,000
 15
Coahoma MS CDBG Renovate
exis3ng
former
Hull
School
brick
building
for
mul3purpose
usage
(neighborhood
center),
suitable
for

emergency
shelter
and
ADA
accessibility 












750,000
 15
Coahoma MS CDBG Renovate
exis3ng
community
gymnasium
into
Wellness
Center
with
ADA
accessibility
to
include
athle3c
field

and
recrea3onal
park 










1,300,000
 20
Coahoma MS CDBG Street
Improvements‐Overlay
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town's
street
system
and

sidewalks 










1,000,000
 20
Coahoma MS CDBG Redevelopment
of
Main
Street
including
sidewalks,
ligh3ng,
and
purchase
&
rehab
of
old
buildings 










1,500,000
 25
Coahoma MS Energy Renovate
homes
within
community
to
be
more
energy
efficent
as
well
as
equip
them
with
the
capacity
to

u3lize
alterna3ve
innova3ve
fuel
consump3on
upgrades.
etc.
(
solar
energy
).













750,000
 12
Coahoma MS Public
Safety Police
Vehicles
(2) 














45,000

Coahoma MS Public
Safety Youth
Mentor/Resource
Liasion 














50,000
 1
Coahoma MS Public
Safety Police
Officers
(2) 














60,000
 2
Coahoma MS Schools Community
Based
Parent
Involvement
Center/Coordinator
&
resource
team
(Housed
@
Town
Hall
or
Community
Resource
Center) 










1,500,000
 4
Coahoma MS Water 1000
gpm
Water
Well 












500,000
 10
Coahoma MS Water Water

and
Sewer
Improvements
‐
upgrade
and
extend
exis3ng
water
and
sewer
lines,
install
fire
plugs

throughout
the
town
and
refurbish
water
tower 










2,000,000
 15
Columbia MS Streets/Roads Street
reconstruc3on 








35,000,000
 10
Crenshaw MS CDBG develop
outdoor
recrea3onal
park 












200,000
 10
Crenshaw MS CDBG construc3on
of
a
mul3‐purpose
building 












500,000
 20
Crenshaw MS CDBG construc3on
of
a
municipal
building 












500,000
 20
Doddsville MS CDBG Pedestrian
improvements
‐
Construc3on
of
ADA
accessible
sidewalk
network
throughout
town. 














75,000
 8
Doddsville MS CDBG Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
parking,
and
ADA
accessibility. 












250,000
 12
Doddsville MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 












680,000
 18
Doddsville MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on

and
treatment
system
for
en3re
town. 










1,000,000
 20
Friars
Point MS CDBG Town
Hall
Renova3on
of
exis3ng
Town
Hall
to
include
parking
and
ADA
accessibility 












375,000
 10
Friars
Point MS CDBG Water
and
Sewer
improvements
Replacements
and
repair
of
water
distribu3on
and
wastewater
collec3on
and

treatmentsystem
of
en3re
town 












275,000
 20
Friars
Point MS CDBG Street
improvement
overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
street
system 












350,000
 25
Friars
Point MS CDBG Construc3on
of
a
Inter‐Genera3onal
Day
Care
Center
to
include
parking
and
accessibility 










4,150,000
 60
Friars
Point MS Housing Construct
25
houses
for
first
3me
buyers
including
land
acqusi3on 










1,000,000
 25
Friars
Point MS Public
Safety Purchase
two
(2)
police
cars 














50,000
 1
Friars
Point MS Public
Safety Hire
two
(2)
police
officers 














60,000
 2
Friars
Point MS Schools Elementary
Classroom
Mobile
Laptop
Carts:
This
project
is
for
implementa3on
of
mobile
laptop
carts
at
Friars

Point
Elementary
School 














50,000
 5
Friars
Point MS Schools Friars
Point
Elementary
School
purchase
and
install
projectors
and
smartboards.

Installs
new
teaching
tool
for

classroom
installa3on 












500,000
 5
Friars
Point MS Schools Friars
Point
Elementary
School
Video
Surveillance
System
Installa3on 












150,000
 5
Friars
Point MS Schools New
Construc3on
of
Friars
Point
Elementary
School
Math
and
Science
Wing 












300,000
 20
Goodman MS Water The
town
of
Goodman,
MS
is
located
in
Holmes
County
Mississippi.
The
Town
currently
has
approximately
450

water
meter
customers,
both
commercial
and
residen3al.
The
Town
needs
to
update
and
upgrade
it's
water

meters
and
water
meter
reading
system.
The
pr 












600,000
 4
Greenville MS Airport Mid
Delta
Regional
Airport
Security
Enhancements
‐
To
upgrade
airport
security
perimeters
and
controls
that

limit
access
into
secured
airport
areas 










4,000,000
 95
Greenville MS CDBG Historic
Masonic
Lodge
Building
Restora3on
‐
to
restore
the
historic
Masonc
Lodge
Hall
Building
in
downtown

Greenville 










2,000,000
 47
Greenville MS CDBG Police
and
Fire
Fighters
Health
and
Wellness
Center
‐
To
construct
a
Health
and
Wellness
Center
for
Police
and

Fire
Fighters 










2,000,000
 47
Greenville MS CDBG Municipal
Youth
Baseball
and
Basketball
Facili3es
Moderniza3on
‐
To
complete
needed
renova3ons
and

infastructure
enhancements
in
3
youth
recrea3onal
facili3es
and
4
baseball
fields 










5,000,000
 119
City State Program Project
Descrip3on Funding
Required Jobs
Greenville MS CDBG Greenville
Police
Department
Headquarters
Building
Renova3ons
‐
To
renovate
and
equip
the
current
police

sta3on
to
current
standards 










7,500,000
 178
Greenville MS CDBG Na3onal
Mississippi
Delta
Heritage
Corridor
Development
Project
‐
To
begin
redevelopment
of
the
downtown

"Na3onal
Heritage"
area
of
Greenville
to
be
known
as
the
Na3onal
Mississippi
Delta
Heritage
Corridor
to

include
the
Mississippi
Delta
Museum,
Bass 








15,600,000
 371
Greenville MS CDBG Targeted
Cri3cal
Street
Revitaliza3on
Project
‐
To
complete
needed
repairs
to
11
cri3callydegraded
major

streets
in
the
City
of
Greenville 








23,000,000
 547
Greenville MS CDBG Municipal
Bridge
and
Thoroughfare
Restora3on
Project
‐
To
complete
repairs
and
restora3on
of
3
major

bridges
and
street
approaches 








28,000,000
 666
Greenville MS CDBG Roadway
Drainage
Mi3ga3on
and
Safety
Project
‐
To
perform
needed
drainage
mi3ga3on
construc3on
projects

impac3ng
major
municipal
roadways 








42,000,000
 1000
Greenville MS Energy Greenville
City
Hall
Ligh3ng
Efficiency
upgrades
‐
to
replace
ligh3ng
throughout
city
hall
for
more
energy

efficent
and
cost
effec3ve
products 












750,000
 18
Greenville MS Streets/Roads 1.
TN
Gas
Road
Project
‐
to
complete
needed
repairs
to
major
road
on
expanding
side
of
city 










1,000,000
 23
Greenville MS Streets/Roads Greenville
Airport
Road
Reconstruc3on 










5,000,000
 119
Greenville MS Streets/Roads Route
82
Bypass
‐
To
construct
the
Route
82
Bypass
in
Greenville,
MS 








80,000,000
 1904
Greenville MS Water Municipal
Water
System
Emergancy
Power
System
Replacement
‐
To
provide
emergancy
power
genera3on
at

each
of
the
11
municipal
water
wells 










2,000,000
 47
Greenville MS Water Municipal
Water
System
Ozona3on
Program
‐
to
remove
the
turbidity
(brown
color)
from
the
municipal

drinking
water
system 








12,000,000
 285
Greenville MS Water Neighborhood
Drainage
Enhancement
and
Flood
Mi3ga3on
Projects
‐
To
address
cri3cal
neighborhood

drainage
and
flood
mi3ga3on
problems 








34,000,000
 809
Greenville MS Water Municipal
Sewer
System
Rehabilita3on
Project
‐
to
address
cri3cal
rehabilita3on
needs
of
the
exis3ng

municipal
sewer
system 








74,000,000
 1700
Greenwood MS Airport Airport
improvements
‐
Including
control
tower,
runways,
and
accessory
buildings. 










2,500,000
 20
Greenwood MS Amtrak Depot
renova3on
‐
Renova3on
to
exis3ng
AMTRAK
passenger
depot
to
include
parking
and
ADA
accessibility. 












600,000
 21
Greenwood MS CDBG Community
center
improvement
‐
Renova3on
of
exis3ng
community
center
to
include
electrical,
plumbing,

HVAC,
kitchen,
parking,
and
ADA
accessibility. 










1,200,000
 22
Greenwood MS CDBG Downtown
streetscape
improvements
‐
Upgrade
of
exis3ng
sidewalk
network,
crosswalks,
ADA
accessibility,

underground
u3li3es,
ligh3ng,
and
landscaping. 










7,000,000
 35
Greenwood MS CDBG Street
improvements
‐
Overlay,
curb
and
gufer,
and
storm
drainage
for
needed
areas
of
city
street
system. 








25,000,000
 48
Greenwood MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on

and
treatment
system
in
the
city. 








25,000,000
 48
Greenwood MS Schools Public
School
Moderniza3on
‐
Demoli3on
and
construc3on
of
Bankston
elementary
school
to
include
parking,

traffic
circula3on,
informa3on
technology
upgrades,
and
ADA
accessibility. 








20,000,000
 48
Greenwood MS Schools Public
School
Moderniza3on
‐
Renova3on
and
reconstruc3on
of
public
schools
located
throughout
the

Greenwood
municipal
school
district
to
include
parking,
traffic
circula3on,
informa3on
technology
upgrades,

and
ADA
accessibility. 








30,000,000
 58
Greenwood MS Streets/Roads Street
improvements
‐
Overlay,
curb
and
gufer,
and
storm
drainage
for
needed
areas
of
city
street
system. 








12,000,000
 24
Gunnison MS CDBG Fire
Sta3on
‐
Renova3on
and
repair
of
exis3ng
fire
sta3on
to
include
kitchen,
mee3ng
room,
and
ADA

accessibility. 














75,000
 8
Gunnison MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 










1,750,000
 20
Gunnison MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on

and
treatment
system
for
en3re
town. 










2,800,000
 28
Gunnison MS Water refurbish
elevated
water
storage
tower 












240,000
 6
Gunnison MS Water rehabilitate
water
distribu3on
lines 












350,000
 6
Gunnison MS Water rehabilitate
wastewater
treatment
facility/#1
pump
sta3on 












400,000
 8
Haqesburg MS Airport Bobby
Chain
Airport
Drainage
Improvements
Phase
II 












350,000
 8
Haqesburg MS Airport Bobby
Chain
Airport
Drainage
‐
Priests
Creek 












750,000
 12
Haqesburg MS Airport Bobby
Chain
Airport
Runway/Taxiway
Ligh3ng 












150,000
 12
Haqesburg MS Airport Bobby
Chain
Airport
ILS 












450,000
 15
Haqesburg MS Airport Bobby
Chain
Airport
Runway/Taxiway
Extension 










3,000,000
 45
Haqesburg MS CDBG Gordan's
Creek
Banks
Stabiliza3on
 










2,000,000
 10
Haqesburg MS CDBG Tatum
Soccer
Field
Reconstruc3on 












500,000
 15
Haqesburg MS CDBG East
and
West
4th
Street
Drainage
Improvements 










4,000,000
 20
Haqesburg MS CDBG Mobile/Bouie
Street
Drainage
Improvements 










1,700,000
 20
Haqesburg MS CDBG Tipton
Street
Drainage
Improvements
 












885,000
 20
Haqesburg MS CDBG Longleaf
Trace
Phase
IV
‐
Parking
Lot 












300,000
 28
Haqesburg MS CDBG Longleaf
Trace
Phase
V
‐
Extension
Downtown 












500,000
 30
Haqesburg MS CDBG Innova3on
and
Commercializa3on
Park
Eastern
Access 










1,500,000
 35
Haqesburg MS CDBG Innova3on
and
Commercializa3on
Park
Southern
Boulevard 










2,000,000
 40
Haqesburg MS CDBG Innova3on
and
Commercializa3on
Park
Southern
Boulevard 










2,500,000
 40
Haqesburg MS CDBG Longleaf
Trace
Phase
VI
‐
Leaf
River
Bridge 












900,000
 42
Haqesburg MS CDBG Chain
Park
Phase
II
‐
Complete
mul3‐purpose
trail
and
park
along
the
Leaf
River 










1,161,000
 50
Haqesburg MS Energy Downtown
Ligh3ng 












750,000
 18
Haqesburg MS Energy South
Lagoon
Aera3on
Improvements 










3,000,000
 25
Haqesburg MS Streets/Roads Traffic
Signal
at
Veterans
Memorial
Boulevard 












100,000
 12
Haqesburg MS Streets/Roads Rails
to
Trails
Phase
II 












930,000
 20
Haqesburg MS Streets/Roads Mar3n
Luther
King
Phase
II 












750,000
 35
Haqesburg MS Streets/Roads Penton
Road 












950,000
 35
Haqesburg MS Streets/Roads South
28th
Avenue
reconstruc3on 










1,500,000
 35
Haqesburg MS Streets/Roads Truck
Route
between
James
Street
and
East
Hardy
Street 










2,500,000
 35
Haqesburg MS Streets/Roads 4th
Street
Improvements
Phase
II 










4,000,000
 50
Haqesburg MS Streets/Roads ITS
Improvements
Phase
III 










3,280,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Haqesburg MS Streets/Roads Roadway
Ligh3ng
‐
Provide
ligh3ng
along
main
corridors
in
and
out
of
Haqesburg 










7,500,500
 50
Haqesburg MS Streets/Roads Traffic
Signal
Improvements
‐
Upgrade
signals
from
exis3ng
span‐wire
to
mast‐arm 










7,380,700
 50
Haqesburg MS Water Highway
98
Booster
Sta3on 












350,000
 5
Haqesburg MS Water Bouie
Street
Sewer
Improvements 










1,600,000
 10
Haqesburg MS Water Lamar
Boulevard
Sanitary
Sewer 












500,000
 12
Haqesburg MS Water Tatum
Road/Bonhomie
Sanitary
Sewer 












275,000
 12
Haqesburg MS Water Bonhomie
Water
Main 












350,000
 15
Haqesburg MS Water Bouie
Street
Water
Improvements 










1,150,000
 15
Haqesburg MS Water J.
Ed
Turner/Jackson
Road
Water
Main 












500,000
 15
Haqesburg MS Water Oak
Grove
Water
Main 












950,000
 15
Haqesburg MS Water Replace
Water
Main
at
Country
Club
Estates 












925,000
 15
Haqesburg MS Water Oak
Grove
Water
Tank 












750,000
 18
Haqesburg MS Water Replace
Sanitary
Sewer
along
Arledge 












475,000
 18
Haqesburg MS Water Replace
Sanitary
Sewer
along
Highway
42 












500,000
 18
Haqesburg MS Water Replace
Sanitary
Sewer
along
Klondyke 












450,000
 18
Haqesburg MS Water North
Lagoon
Expansion 










2,000,000
 25
Ifa
Bena MS CDBG City
Hall
Complex
‐
Construc3on
of
new
City
Hall
complex
to
include
administra3ve
offices,
community

mee3ng
space,
parking,
and
ADA
accessibility. 












300,000
 18
Ifa
Bena MS CDBG Street
Improvements
‐
Overlay,
curb
and
gufer,
and
storm
drainage
for
en3re
city
street
system. 










2,500,000
 22
Ifa
Bena MS CDBG Water
and
Sewer
Improvements
‐
Renova3on
and
replacement
of
city
water
supply,
distribu3on,
and

wastewater
collec3on
and
treatment
systems.
 










2,500,000
 30
Ifa
Bena MS CDBG Drainage
Improvements
‐
Replacement,
repair,
and
new
construc3on
of
city
storm
drainage
system. 










3,500,000
 38
Jackson MS Airport Dispatch
Consol
and
Radios 














95,000
 0
Jackson MS Airport Disparity
Study 












300,000
 5
Jackson MS Airport Hawkins
Field
Stormwater
Drainage
Improvements
Phase
1 












171,000
 5
Jackson MS Airport Hawkins
Field
storm
drainage 












900,000
 10
Jackson MS Airport Master
Plan
Update
‐
JEIA 












392,739
 10
Jackson MS Airport Passenger
Boarding
Bridges
‐
JEIA 










2,672,303
 10
Jackson MS Airport Hawkins
Field
signage
and
markings 












332,500
 12
Jackson MS Airport Apron
Repairs
‐
JEIA 












491,000
 20
Jackson MS Airport Access
control
at
Hawkins
Field 










3,000,000
 35
Jackson MS Airport Installa3on
of
Perimeter
Road
‐
Airside
JEIA 










5,000,000
 40
Jackson MS Airport Pavement
Rehabilita3on
‐
JEIA 










6,270,000
 40
Jackson MS Airport Rehabilita3on
of
Storm
Water
Infrastructure
‐
JEIA 










3,135,000
 45
Jackson MS Airport Access
Control
Security
‐
JEIA 










1,914,233
 50
Jackson MS Airport Expansion
of
Interna3onal
Drive
to
4
lanes
‐
JEIA 








15,000,000
 150
Jackson MS Airport Runway
extension
at
Hawkins
Field 








15,000,000
 150
Jackson MS Airport Reloca3on
of
ATC
Tower
‐
JEIA 








15,000,000
 200
Jackson MS Airport Runway
extension
at
JEIA 








30,000,000
 200
Jackson MS CDBG Jackson
Zoo
‐
Administra3on
Building
needs
pain3ng,
restroom
work
and
the
heat
pump
replaced 















6,950

Jackson MS CDBG Jackson
Zoo
‐
Change
the
Educa3on
Building
to
the
Marke3ng/Events
Building,
repair
roof
and
other
general

maintenance
repairs 














34,000

Jackson MS CDBG Jackson
Zoo
‐
Remove
/
add
another
metal
storage
building
(Old
Green
Bird
Barn) 














23,500

Jackson MS CDBG Jackson
Zoo
‐
Remove
Parkins
Building 














60,000

Jackson MS CDBG Jackson
Zoo
‐
Water.Drainage
Lines
‐
Noted
in
plan
in
four
sec3ons
‐
one
and
two
at
the
same
3me 














40,700

Jackson MS CDBG Jackson
Zoo‐
Roof
replaced
on
facili3es
office 














27,775

Jackson MS CDBG Mississippi
Municipal
Art
Gallery
Roof 














60,000
 2
Jackson MS CDBG Smith
Robertson
Community
Center
Roof 












150,000
 2
Jackson MS CDBG Smith
Robertson
Museum
&
Cultural
Center
Roof 












150,000
 2
Jackson MS CDBG Macon
Street
Drainage
Improvements 












400,000
 3
Jackson MS CDBG Mary
C.
Jones,
Early
Childhood
Development
Center
Roof 












300,000
 4
Jackson MS CDBG Legion
Park
sobball
field
(4‐plex) 












750,000
 5
Jackson MS CDBG Mississippi
Art
Center
Roof 












350,000
 5
Jackson MS CDBG Eubanks
Creek
From
Meadow
Drive
to
Northside
Drive 










1,000,000
 6
Jackson MS CDBG Eubanks
Creek
From
Northview
Drive
to
Old
Canton
Road 










1,500,000
 6
Jackson MS CDBG Town
Creek
Tributary
No.
4
From
Medgar
Evers
to
Erie
Street 












800,000
 6
Jackson MS CDBG Town
Creek
Tributary
No.
5
From
Northside
Drive
to
Utah
Street 












800,000
 6
Jackson MS CDBG Tributary
of
Belhaven
Creek
From
Riverside
Drive
to
Belhaven
Creek 










1,000,000
 6
Jackson MS CDBG Tributary
of
Trahon
Creek
on
Swan
Lake
Cove 












800,000
 6
Jackson MS CDBG Belhaven
Creek
From
Woodrow
Wilson
to
Riverside
Drive 












800,000
 7
Jackson MS CDBG Caney
Creek
From
Terry
Road
to
Meadowlane
including
Sunset
Terrace 










1,500,000
 7
Jackson MS CDBG Lynch
Creek
Drainage
Improvements
on
Queen
Eleanor 










1,500,000
 7
Jackson MS CDBG Purple
Creek
Stream
#2
From
Northpointe
Drive
to
Rolling
Meadows
Drive 










1,000,000
 8
Jackson MS CDBG Town
Creek
Tributary
No.
4
From
Main
Street
to
Channel 












500,000
 8
Jackson MS CDBG Eubanks
Phase
II 










1,500,000
 12
Jackson MS CDBG Sunset
Drive
Bridge
Replacement 












500,000
 12
Jackson MS CDBG State
Street
Improvements
From
Woodrow
Wilson
to
Lakeland
Drive 










2,200,000
 14
Jackson MS CDBG Renova3on
of
George
Washington
Carver
Library
for
Community
Center 












800,000
 15
Jackson MS CDBG Street
Reconstruc3on
of
Mosley
Drive 










1,300,000
 15
Jackson MS CDBG Westhaven
Road
Bridge
Replacement 










1,000,000
 15
Jackson MS CDBG Meadowbrook
Road
Street
Improvements
From
State
Street
to
I‐55
Frontage
Road 










2,500,000
 16
City State Program Project
Descrip3on Funding
Required Jobs
Jackson MS CDBG Cedars
of
Lebanon
Bridge
Replacement 










1,500,000
 18
Jackson MS CDBG Renova3on
of
Viola
Lake
House
for
Community
Center 










1,000,000
 18
Jackson MS CDBG Construc3on
of
infrastructure
improvements
for
Morehouse
Street
Project 










1,000,000
 20
Jackson MS CDBG Design
and
construc3on
of
Historic
Garden
in
the
Farish
Street
Historic
District 












800,000
 20
Jackson MS CDBG Design
services
and
funding
for
infrastructure
improvements
for
Bon
Air
Housing
Development 










1,000,000
 20
Jackson MS CDBG Morehouse
Street 










1,800,000
 20
Jackson MS CDBG South
Street
Bridge 










1,800,000
 20
Jackson MS CDBG Splash
Parks
(7) 










3,500,000
 20
Jackson MS CDBG Boling
Street
Improvements 










2,000,000
 25
Jackson MS CDBG Buddy
Bufs
Park
Improvements 










5,000,000
 25
Jackson MS CDBG Design
and
construc3on
of
30
unit
condo
development
in
Farish
Street
Historic
District 










3,400,000
 25
Jackson MS CDBG Manhafan
Street
Bridge
&
Street
Improvements
From
Meadowbrook
Road
to
Cedars
of
Lebanon 










2,500,000
 25
Jackson MS CDBG Northside
Drive
From
Bailey
Avenue
to
I‐55
Frontage
Rd. 










2,000,000
 25
Jackson MS CDBG Terry
Road
Street
Improvements
From
McDowell
Road
to
McCleur
Road 










2,000,000
 25
Jackson MS CDBG Shaw
Road
Street
Improvements 










1,600,000
 26
Jackson MS CDBG Capital
Street
Improvements
From
Ellis
Avenue
to
Galla3n
Street 










3,500,000
 28
Jackson MS CDBG For3fica3on
Street
Improvements
From
Bailey
Avenue
to
Woodrow
Wilson 










3,500,000
 28
Jackson MS CDBG Galla3n
Street
Improvements
From
Capital
Street
to
I‐20 










3,500,000
 28
Jackson MS CDBG State
Street
Improvementst
From
Woodrow
Wilson
to
Northside
Drive 










3,500,000
 28
Jackson MS CDBG Clinton
Blvd
Street
Improvements
From
I‐220
to
Clinton/Jackson
line 










3,000,000
 30
Jackson MS CDBG Medgar
Evers
Street
Improvements
From
Woodrow
Wilson
to
Northside
Drive 










3,000,000
 30
Jackson MS CDBG Renova3ons
and
roof
repairs
for
5
community
centers:
Grove
Park
Community
Center,
Jayne
Ave.
Community

Center,
Presiden3al
Hills
Community
Center,
Westside
Community
Center,
and
Champion
Community
Center 










3,000,000
 30
Jackson MS CDBG Beasley
Road
Improvements
From
Watkins
Drive
to
I‐55
Frontage
Road 










5,000,000
 35
Jackson MS CDBG West
Street
From
MeadowBrook/Hanging
Moss
Intersec3on
to
Lamar
Street 










5,000,000
 35
Jackson MS CDBG Natatoriums
(4)
with
Olympic
pools

(year
round
use) 








10,000,000
 55
Jackson MS CDBG White
Oak
Creek
From
Adkins
Blvd
to
Old
Canton
Road 








10,000,000
 60
Jackson MS Energy New
asphalt
around
garage 














50,000
 0
Jackson MS Energy Addi3onal
staff
to
maintain
post
construc3on
strucrural
controls 














70,000
 2
Jackson MS Energy Golden
Key
Community
Center
Roof 












150,000
 2
Jackson MS Energy In
house
storm
water
tes3ng
equipment 














25,000
 2
Jackson MS Energy Program
Management 














85,000
 2
Jackson MS Energy Storm
Flo
Screen
for
lifer
and
solids
removal
in
flood
prone
areas 














60,000
 2
Jackson MS Energy T.
L.
Community
Center
Roof 












150,000
 2
Jackson MS Energy Tougaloo
Community
Center
Roof 












250,000
 2
Jackson MS Energy Landfill
Scale
and
road
Development 














75,000
 3
Jackson MS Energy OB
Traps
cons3nous
24
hour
monitoring
of
storm
water
out
falls 














60,000
 3
Jackson MS Energy Open
Dumping
Surveillance
System 














75,000
 3
Jackson MS Energy Storm
Water
Monitoring
Equipment 














50,000
 3
Jackson MS Energy 2
Equipment
and
Maintenance
Operators 














98,001
 4
Jackson MS Energy Berm
around
Facility 














50,000
 4
Jackson MS Energy Outside
storage
building
needs
new
hip
roof
and
replacement
of
structural
wood 














25,000
 4
Jackson MS Energy Public
Outreach
and
Educa3on 














75,000
 4
Jackson MS Energy Creek
Screening
and
Sampling
Inves3ga3ng
discharge 












180,000
 6
Jackson MS Energy Needs
internal
building
structure
repairs 












100,000
 6
Jackson MS Energy Josh
Halbert
Gardens
Improvements 










1,000,000
 7
Jackson MS Energy 509
Pearl
Street
Building
Improvements 










1,000,000
 10
Jackson MS Energy City
Baseball
Fields
(48)
Ligh3ng
Improvements 










1,000,000
 10
Jackson MS Energy Interstate
55
Alternate
Signal
Timing
Plans 












200,000
 10
Jackson MS Energy Landfill
Redemp3on
(McDowell
Road) 












500,000
 10
Jackson MS Energy New
asphalt
around
garage 












125,000
 10
Jackson MS Energy Oil/Water

Separator 












225,000
 10
Jackson MS Energy Rain
garden
construc3on
projects
around
roadway
ouzalls
and
public
buildings 












200,000
 10
Jackson MS Energy Traffic
Signal
LED
Retrofit
and
Meter
Installa3on 












300,000
 10
Jackson MS Energy UMC
Medical
Mall
Signal
Synchroniza3on
Plan 












115,000
 10
Jackson MS Energy VA
Park
Ligh3ng
Improvements 










2,000,000
 10
Jackson MS Energy JATRAN
Administra3ve
Building

(LEEDS
compliant) 










5,500,000
 12
Jackson MS Energy Playground
safety
enhancements 










2,700,000
 14
Jackson MS Energy Green
Recycling
and
Processing
Project
(Landfill
and
Streets) 












120,000
 15
Jackson MS Energy Environmental
Recycling
and
Green
Distribu3on
Center 










3,000,000
 20
Jackson MS Energy Impound
Lot/facility 










4,000,000
 20
Jackson MS Energy Solar
Panels
for
all
community
centers
operated
by
the
City 










1,000,000
 20
Jackson MS Energy Mynelle
Garden
Improvements 










1,500,000
 25
Jackson MS Energy Baflefield
Park
Improvements 










1,500,000
 30
Jackson MS Energy Landfill
Redemp3on
(Fes3val
Park
Construc3on) 








10,000,000
 30
Jackson MS Energy North
State
Street
Pedestrian/
Bicycle/Signal
Improvements 












650,000
 35
Jackson MS Housing Construc3on
of
15
units
of
affordable
housing
in
Royal
Manor
Subdivision 










1,875,000
 12
Jackson MS Housing Construc3on
of
20
units
of
affordable
housing
in
Logino
Subdivision 










2,500,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Jackson MS Housing Construc3on
of
40
single
family
affordable
housing
units
in
Bon
Air
Subdivision 










4,000,000
 30
Jackson MS Housing Property
acquis3on
and
construc3on
of
30
single
family
housing
units
in
Historic
Farish
Street
District 










3,800,000
 30
Jackson MS Housing Property
acquis3on
and
construc3on
of
80
unit
mul3family
housing
in
Historic
Farish
Street
District 










6,500,000
 50
Jackson MS Public
Safety Bearcat
Tac3cal
Armored
Vehicle 












226,720

Jackson MS Public
Safety Explosive
Ordinance
Disposal
Unit 












356,500

Jackson MS Public
Safety Fitness
Equipment/Renova3ons
for
Training
Academy
Weight
Room 














60,000

Jackson MS Public
Safety Four
Ladder
Trucks
(Fire
Department) 










4,200,000

Jackson MS Public
Safety Handheld
Laser
Radar 














41,690

Jackson MS Public
Safety Mobile
Command
Unit
for
Jackson
Police
Department 












400,000

Jackson MS Public
Safety Think
Stream
Program 












238,000

Jackson MS Public
Safety 50
Police
Cruisers 










1,050,000
 17
Jackson MS Public
Safety 60
Fire
Fighters
‐
Hiring
fire
fighters
to
reach
recommended
staffing 










1,959,000
 60
Jackson MS Public
Safety Adding
to
COPS
Grants
to
hire
Police
Officers
to
reach
recommended
staffing 










6,575,675
 180
Jackson MS Schools Murrah
High
School
‐
Replacement
of
26
year
old
hea3ng,
ven3la3on
and
air
condi3oning
system
(HVAC)
in

order
to
improve
energy
efficiency
to
comply
with
Energy
Star
Ra3ng
and
to
improve
indoor
air
quality 










4,200,000
 15
Jackson MS Schools Provine
High
School
‐
Replacement
of
26
year
old
hea3ng,
ven3la3on
and
air
condi3oning
system
(HVAC)
in

order
to
improve
energy
efficiency
to
comply
with
Energy
Star
Ra3ng
and
to
improve
indoor
air
quality. 










4,200,000
 15
Jackson MS Streets/Roads Lynch
Street
‐
Highway
18
Interchange 










2,000,000
 10
Jackson MS Streets/Roads Robinson
Rd
Extension(Hwy
18‐McDowell)
resurfacing 










2,000,000
 10
Jackson MS Streets/Roads South
Street
Railroad
Overpass 










1,000,000
 10
Jackson MS Streets/Roads Capitol
Street
(Ellis
‐
Boling)
resurfacing 










3,000,000
 15
Jackson MS Streets/Roads Bullard
Street
(Zoo
‐
Boling)
resurfacing 










3,500,000
 20
Jackson MS Streets/Roads Hwy
18
&
Lynch
St
Reconstruc3on 










2,000,000
 25
Jackson MS Streets/Roads Parking
Meter
Moderniza3on 












320,000
 25
Jackson MS Streets/Roads Westhaven
Blvd
Bridge
Replacement 












125,000
 25
Jackson MS Streets/Roads Lynch
St
Extension
Reconstruc3on

(US
80
to
Hwy
18) 








17,000,000
 30
Jackson MS Streets/Roads Terry
Rd
&
Elton
Rd/Lakeshore
Dr
Intersec3on
Improvements 












300,000
 35
Jackson MS Streets/Roads Galla3n
St
(McDowell‐Monument)
resurfacing 










9,500,000
 40
Jackson MS Streets/Roads For3fica3on
Street
U3lity
Reloca3on 










8,000,000
 45
Jackson MS Streets/Roads Raymond
Rd(Terry‐West
Highland)resurfacing 










9,500,000
 45
Jackson MS Streets/Roads Siwell
Rd/McCleur
Rd
Intersec3on
Improvements 










1,500,000
 50
Jackson MS Streets/Roads South
Street
Bridge
Replacement 










1,000,000
 50
Jackson MS Streets/Roads South
Street
Underpass
Renova3ons 












750,000
 50
Jackson MS Streets/Roads West
County
Line
Road
Phase
1B 










8,000,000
 50
Jackson MS Streets/Roads McDowell
Road
(I‐55
‐
Highway
18)

resurfacing 








12,000,000
 55
Jackson MS Streets/Roads South
State
Street
Railroad
Overpass

Construc3on 








12,500,000
 55
Jackson MS Streets/Roads Lynch
Street
Improvements

(JSU
‐
Highway
80) 








12,500,000
 70
Jackson MS Streets/Roads Mayes
Street
Reconstruc3on 










7,000,000
 75
Jackson MS Streets/Roads Siwell
Rd
Phase
2 










5,500,000
 75
Jackson MS Streets/Roads Lynch
Street
Improvements

(Highway
80
‐
Highway
18) 








17,000,000
 85
Jackson MS Streets/Roads Low
Sufficiency
Bridges
(replacement) 








28,000,000
 120
Jackson MS Streets/Roads West
Street
Reconstruc3on
(George
St
to
Woodrow
Wilson
Ave) 








25,000,000
 125
Jackson MS Transit Security
cameras
for
buses 












150,000
 1
Jackson MS Transit 12
Demand
Response
Buses 












720,000
 5
Jackson MS Transit 18
Fixed
Route
Buses 










6,120,000
 10
Jackson MS Transit Medgar
Evers
Blvd
Traffic
Signal

Improvements 












600,000
 20
Jackson MS Transit Northside
Dr
Signal
Improvements 












750,000
 20
Jackson MS Transit AVL
Bus
Tracking
System 










2,000,000
 25
Jackson MS Transit McDowell
Rd
Traffic
Signal
Improvements 












550,000
 25
Jackson MS Transit CBD
Traffic
Signal
and
Curb
Ramp

Moderniza3on 












450,000
 30
Jackson MS Transit Jatran
Shelter
Improvements 












800,000
 30
Jackson MS Transit Bailey
Ave
Traffic
Signal
Improvements 












650,000
 35
Jackson MS Transit Beasley
Rd
Signal
Improvements 












750,000
 35
Jackson MS Transit Fondren
Area
Improvements
Phase
2
Traffic
Signal
Moderniza3on 












825,000
 35
Jackson MS Transit Ridgewood
Rd
&
Old
Canton
Rd
Signal

Improvements 










1,500,000
 35
Jackson MS Transit Terry
Rd
Corridor
ITS/Signal
Moderniza3on 










1,500,000
 35
Jackson MS Water AMR
Installa3on
Commerical
Meter
Boxes 














20,000
 2
Jackson MS Water AMR
Installa3on
Man
Holes 














20,000
 2
Jackson MS Water Water
System
SCADA
control
upgrades 












600,000
 2
Jackson MS Water AMR
Installa3on
Residen3al
Meter
Boxes 














40,000
 4
Jackson MS Water 2"
&
4"
Water
Line
Improvement
(#7) 










2,750,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Jackson MS Water 2"
&
4"
Water
Line
Improvements
(#8) 










3,000,000
 15
Jackson MS Water Hardy
Creek
Interceptor(i‐55
‐
Reno
Drive) 










5,000,000
 20
Jackson MS Water Three
Mile
Interceptro
(CN
Railroad
‐
Terry
Rd) 










4,000,000
 20
Jackson MS Water Elevated
Storage
Tanks 










5,750,000
 23
Jackson MS Water Maddox
System
Booster
Sta3on 










6,000,000
 24
Jackson MS Water Lynch
Creek
Interceptor
(Segment
D) 










5,000,000
 25
Jackson MS Water Central
Business
District
Water
Improvements 










6,570,000
 26
Jackson MS Water 48"
Water
Transmission
Main
(#4) 










8,500,000
 45
Jackson MS Water 54"
Water
Transmission
Main
(#1) 










8,500,000
 45
Jackson MS Water 48"
Water
Transmission
Main
(#5) 










9,000,000
 50
Jackson MS Water Lynch
Creek
Interceptor
(Segment
B) 








15,000,000
 85
Jackson MS Water Old
Capitol
Green
Project 








57,000,000
 4000
Jonestown MS CDBG Youth
employment
funding
to
support
summer
youth
employment
program
for
up
to
100
young
people
in
the

Town
of
Jonestown 












200,000
 5
Jonestown MS CDBG Town
Hall‐Construc3on
of
New
Town
Hall
to
include
parking
and
ADA
accessibility 












250,000
 12
Jonestown MS CDBG Construct
a
Municipal
Sports
Facility 










1,500,000
 20
Jonestown MS CDBG Renova3ons
of
Granny
and
Lil
People
Castle
Daycare
Centers 












200,000
 20
Jonestown MS CDBG Street
Improvements‐Overlay
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 










2,500,000
 24
Jonestown MS CDBG Redevelopment
of
Downtown
Main
Street
including
sidewalks
and
ligh3ng 












600,000
 25
Jonestown MS Housing Construct
15
houses
for
first
3me
home
buyers 










1,350,000
 30
Jonestown MS Public
Safety Mobile
data
terminals
in
(5)
Police
cars 












100,000
 2
Jonestown MS Public
Safety Construc3on
of
Downtown
Police
Headquarters 












250,000
 10
Jonestown MS Schools Elementary
Classroom
Mobile
Laptop
Carts:
This
project
is
for
Implementa3on
of
mobile
laptop
carts
at

Jonestown
Elementary
School 














50,000
 5
Jonestown MS Schools Jonestown
Elementary
School
‐
purchase
and
install
Projectors
and
Smartboards.
Installs
new
teaching
tool
for

classroom
Instruc3ons. 












500,000
 5
Jonestown MS Schools Jonestown
Elementary
School
‐
Video
Surveillance
System
Installa3on 












150,000
 5
Jonestown MS Schools New
Construc3on
of
Jonestown
Elementary
School
Math
and
Science
Wing 












300,000
 20
Jonestown MS Water Upgrade
exis3ng
water
lines
and
refurbish
water
tank 










1,500,000
 15
Jonestown MS Water Resolve
Chronic
Flooding
Problems
including
stream
restora3on,
deten3on
and
storm
sewers 










1,500,000
 20
Laurel MS Energy Upgrade
controls
and
electrical
systems
at
wastewater
treatment
plants
to
decrease
energy
consump3on 










1,850,000

Laurel MS Energy Upgrade
controls
and
electrical
systems
at
water
treatment
plants
to
decrease
energy
consump3on 












830,000

Laurel MS Housing Doorbells 














99,600
 2
Laurel MS Housing Exterior
Building
Repairs 












100,000
 3
Laurel MS Housing Hea3ng 












120,000
 4
Laurel MS Housing Sewer/Drainage
Line
Repair 












600,000
 4
Laurel MS Housing Interior/Exterior
Renova3ons
at
Arco
Lane 










1,200,000
 15
Laurel MS Housing Security
Officers
@
each
site 












860,000
 24
Laurel MS Schools Jones
Middle
School
–
Restore
Floors,
replace
seats
in
auditorimu 












200,000
 15
Laurel MS Schools Laurel
High
School
–
Replace
windows
for
energy
efficiency 












800,000
 15
Laurel MS Schools Maddox
Alterna3ve
School
–
Modernize
Windows

for
energy
efficiency 












500,000
 15
Laurel MS Schools Nora
Davis
Magnet
School
‐
Replace
windows
in
historical 












150,000
 15
Laurel MS Schools Oak
Park
Elementary
School
–
Replace
Floors,
Renovate
Auditorium 












250,000
 25
Laurel MS Schools Wisner
Building
–
Stabilize
Founda3on,
new
gym
floor,
replace
windows,
hea3ng/cooling/drainage 










1,000,000
 30
Laurel MS Streets/Roads 16th
Avenue
signal
upgrades
and
Integrated
Traffic
System
to
improve
traffic
flow
on
Highway
15 










1,600,000

Laurel MS Streets/Roads Central
Avenue
reconstruc3on
of
old
pedestrian
walkway
to
appropriate
roadway
standards
and
provide

proper
signaliza3on 










2,200,000

Laurel MS Streets/Roads Chan3lly
Street
Overpass
to
connect
East
and
West
Laurel
while
bypassing
local
street
conges3on 








18,500,000

Laurel MS Streets/Roads Fibh
Street
realignment
to
alleviate
traffic
conges3on
by
changing
a
3
lane
segment
to
a
5
lane
segment 










1,200,000

Laurel MS Streets/Roads Jackson
Street
Extension
to
reroute
traffic
flow
due
to
closing
of
Interstate
59
ramps 










5,800,000

Laurel MS Streets/Roads Presiden3al
Parkway
to
provide
East‐West
corridor
for
improved
traffic
opera3on,
capacity,
and
safety 










7,000,000

Laurel MS Transit Establish
a
mass
transit
system
for
the
City
by
purchasing
5
buses,
providing
maintenance,
office
support,
and

bus
stops 












832,769
 17
Laurel MS Water Projects
to
address
Potable
Water
System
pressure
deficiencies
and
replace
aging
infrastructure 










5,145,000

Laurel MS Water Projects
to
address
Sanitary
Sewer
Overflows
and
replace
aging
infrastructure 










6,806,000

Laurel MS Water Water
wells,
water
tank
and
waterlines
to
improve
water
supply
to
industry
and
the
hospital 










3,800,000
 60
Louise MS Streets/Roads STREET
OVERLAY
AND
STORM
DRAINAGE 












850,000
 25
Meadville MS Streets/Roads Repair/overlay
streets
following
sewer
and
water
upgrades
plus
other
needed
street
repair/overlay 










2,500,000
 10
Meadville MS Water Upgrade
exis3ng
sewer
lines
installed
from
1949
through
the
next
twenty/twenty‐five
years 










5,000,000
 10
Meadville MS Water Upgrade
exis3ng
water
lines
and
refurbish
water
tanks 










5,000,000
 10
Meridian MS Airport Construct
hangar
access
road 












750,000
 36
Meridian MS Airport Drainage
improvements‐‐maintenance,
wildlife 










2,000,000
 60
Meridian MS Airport Complete
Taxiway
"A"
reloca3on 








10,000,000
 89
Meridian MS Airport Extension
of
Taxiway
"A"
reloca3on 










3,500,000
 89
Meridian MS CDBG Demoli3on‐‐Doughboy
Monument
surroundings 














10,000
 0
Meridian MS CDBG Demoli3on‐‐lease
spaces
in
parking
garage 














50,000
 2
Meridian MS CDBG Demoli3on‐‐Ragsdale
Block
86
for
new
PD 












150,000
 4
Meridian MS CDBG Demoli3on‐‐Trustmark
Bank
&
srroundings 












150,000
 4
Meridian MS CDBG Demoli3on‐‐6th,
7th
sts.
from
22nd
to
25th
aves. 












180,000
 5
Meridian MS CDBG Downtown
storm
water
management
system 












150,000
 10
Meridian MS CDBG Demoli3on‐‐old
parking
garage 












550,000
 14
City State Program Project
Descrip3on Funding
Required Jobs
Meridian MS CDBG Carnegie
Library
restora3on 










2,500,000
 20
Meridian MS CDBG Traffic
light
repair/replacement
for
fuel
efficiency 










1,000,000
 25
Meridian MS CDBG 22nd
Ave.
Overpass
renova3ons 










1,000,000
 30
Meridian MS CDBG 26th
Ave.
subway
renova3ons 










3,000,000
 50
Meridian MS CDBG Hospital
District
implementa3on 










3,000,000
 60
Meridian MS CDBG Redline
Community
drainage
project 












500,000
 75
Meridian MS CDBG Kress
Building
new
museum
and
exhibits 








26,000,000
 85
Meridian MS CDBG City
Hall
Green 










7,000,000
 100
Meridian MS CDBG Sewage
treatment
plant
for
east
Meridian 








10,000,000
 125
Meridian MS Energy Solar
power
systems
at
3
fire
sta3ons 












450,000
 0
Meridian MS Energy Energy
retrofit
City
Hall 










1,000,000
 15
Meridian MS Energy Energy
retrofit
Threefoot
building 










1,000,000
 15
Meridian MS Energy Recycling
facility 












750,000
 20
Meridian MS Energy Energy
retrofit
35
public
buildings 












600,000
 50
Meridian MS Housing Construct
gazebo
for
senior
ci3zens 














15,000
 5
Meridian MS Housing Reconfigure
community
center
for
police
precinct 














10,000
 5
Meridian MS Housing Repair
buckling
sidewalks
throughout
sites 














20,000
 5
Meridian MS Housing Repair
playground
equipment
for
safety 














20,000
 5
Meridian MS Housing Replace
security
doors
at
senior
sites
for
safety 














25,000
 5
Meridian MS Housing Reconfigure
central
maintenance
facility 














30,000
 6
Meridian MS Housing Erosion,
sink
hole
repairs
throughout
sites 














50,000
 10
Meridian MS Housing Pot
hole
repair,
street
resurfacing 














55,000
 10
Meridian MS Housing Property
entrance
signs
with
landscaping 














30,000
 10
Meridian MS Housing Security
ligh3ng
throughout
9
sites 














85,000
 10
Meridian MS Housing Public
housing
renova3ons
and
repairs—all
sites 












245,000
 15
Meridian MS Public
Safety Mobile
data
terminals
in
50
patrol
vehicles 












500,000
 0
Meridian MS Public
Safety 8
new
officers
through
COPS
for
drug/gang
detail 












296,000
 8
Meridian MS Streets/Roads Repair
retaining
wall
for
33rd
Ave. 










1,000,000
 25
Meridian MS Streets/Roads Replace
31st
Ave.
bridge
over
Sowashee
Creek 










4,000,000
 30
Meridian MS Streets/Roads Industrial
road
from
I‐20/59
to
Hwy.
80 








10,000,000
 45
Meridian MS Streets/Roads North
Hills
St.
widening 










5,000,000
 45
Meridian MS Streets/Roads Street
drainage
rehab
downtown 










5,000,000
 60
Meridian MS Streets/Roads Industrial
road
from
I‐20/59
to
Hwy.
19 








16,000,000
 75
Meridian MS Streets/Roads Street
overlay 








15,000,000
 100
Meridian MS Streets/Roads Street
resurfacing 








15,000,000
 100
Meridian MS Water Valve
truck
and
crew
for
valve
maintenance 












151,653
 2
Meridian MS Water Back‐up
generator
at
water
plant 












750,000
 8
Meridian MS Water Rehab
work
at
water
plant 










2,000,000
 15
Meridian MS Water 2
new
water
wells 










3,000,000
 20
Meridian MS Water Replace
water
lines 










1,000,000
 20
Meridian MS Water Addi3onal
treatment
at
water
plant 










1,000,000
 25
Meridian MS Water Rehab
work
at
wastewater
treatment
plant 










4,000,000
 25
Meridian MS Water Lines
rehab
in
waste
water 










2,000,000
 30
Meridian MS Water Repair
Long
Creek
dam 










3,000,000
 35
Meridian MS Water wastewater
plant
rehab 










5,000,000
 50
Meridian MS Water lines
rehab‐‐freshwater 










2,000,000
 75
Meridian MS Water Lines
rehab‐‐wastewater 










3,000,000
 75
Meridian MS Water Water
lines
to
annexed
area 










5,000,000
 80
Meridian MS Water Sewer
to
annexed
area 










7,000,000
 90
Merigold MS CDBG Drainage
improvements
‐
Dredge
and
clean
out
town
drainage
ditch
to
include
excava3on
and
rip
rap. 












375,000
 10
Merigold MS CDBG Water
and
sewer
facili3es
‐
Replacement
of
water
distribu3on
and
sewer
collec3on
lines
throughout
the
town.













750,000
 18
Merigold MS Schools Hayes
Cooper
School
‐
Renova3on
of
building,
HVAC
improvements,
electrical
and
plumbing,
and

moderniza3on
of
informa3on
technology
systems. 












550,000
 14
Morgan
City MS CDBG Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
parking
and
ADA
accessibility. 












250,000
 12
Morgan
City MS CDBG Street
Improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 












850,000
 17
Morgan
City MS CDBG Water
and
Sewer
Improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on

and
treatment
system
for
en3re
town. 










1,250,000
 20
Mound
Bayou MS CDBG Town
Hall
‐
Renova3on
of
exis3ng
Town
Hall
to
include
parking
and
ADA
accessibility. 












450,000
 12
Mound
Bayou MS CDBG Elderly
Health
Care
‐
Renova3on
of
exis3ng
health
care
facility
to
include
parking
and
ADA
accessibility. 












600,000
 18
Mound
Bayou MS CDBG Health
Center
‐
Renova3on
of
exis3ng
Health
Center
to
include
parking
and
ADA
accessibility. 










1,800,000
 20
Mound
Bayou MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system 










9,800,000
 32
Mound
Bayou MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
collec3on
and
treatment

system
for
en3re
town. 








10,000,000
 38
Mound
Bayou MS Schools Public
School
moderniza3on
‐
Renova3on,
repairs,
and
addi3on
of
ADA
accessibility
to
exis3ng
public
school. 










3,700,000
 28
Natchez MS CDBG Forks
of
the
Road
Heritage
Trail.

This
project
would
greatly
enhance
one
of
the
primary
gateways
to
our
city
by

crea3ng
an
African
American/Ethnic
Heritage
Trail
along
a
stretch
of
St.
Catherine
Street
between
the
Forks
of

the
Road
Slave
Market
Site
 






600,000,000
 65
Natchez MS CDBG Marblestone
Neighborhood
Reconstruc3on
Project.

This
neighborhood,
located
in
a
severely
economically

depressed
area
of
the
city,
experiences
flooding
due
to
inadequate
drainage
and
limited
emergency
and

commercial
access
due
to
remarkably
narrow
street 








11,752,535
 75
City State Program Project
Descrip3on Funding
Required Jobs
Natchez MS CDBG West
S3ers
Neighborhood
Reconstruc3on
Project.
This
network
of
streets
in
a
severely
economically
depressed

area
of
the
city,
must
be
widened
to
increase
neighborhood
commerce
and
meet
general
safety
standards.

Jobs
created
are
+
or
‐
50
or
so
according 








26,581,320
 100
Natchez MS CDBG Margaret
Mar3n
Center
for
the
Arts
renova3ons.

We
plan
to
renovate
an
underu3lized
former
school
building

for
use
as
a
comprehensive
performing
and
visual
arts
center.
It
will
enhance
our
areas
exis3ng
tourism

economy
and
will
provide
short
and
long 










5,000,000
 180
Natchez MS CDBG Phase
I‐‐Neighborhoods
First
Program.

A
comprehensive
revitaliza3on
program
structured
to
bring
economic

development
to
economically
depressed
areas
of
the
city,
especially
to
underserved
popula3ons.

This
phase

would
include
infrastructure
improvement 








12,000,000
 200
Natchez MS CDBG Mississippi
River
Corpora3on
Water
Project.

This
project
would
provide
an
addi3onal
municipal
water
tower

to
Mississippi
River
Corpora3on
and
would
allow
that
corpora3on
to
greatly
expand
opera3ons
and
hire
more

staff
longterm. 












300,000
 300
Natchez MS CDBG North
Natchez
Comprehensive
Drainage
Project.

A
much
needed
project
to
prevent
ongoing
erosion
in
the

economically
depressed
minority
areas
of
North
Natchez.

This
project
will
include
widening
of
exis3ng
streets

for
emergency
vehicle
access 










7,000,000
 300
Natchez MS CDBG Parks
and
Recrea3on
Improvement
Project.

This
project
will
allow
for
maximum
economic
development

impact
by
crea3ng
a
sports
complex
which
would
allow
our
city
to
host
major
regional
and
na3onal
sports

tournaments 










9,500,000
 350
Natchez MS Housing Modernizing
and
Repair
of
Natchez
Housing
Authority
low
income
housing.

These
funds
would
be
used
to

modernize
and
repair
roofs,
kitchens,
and
outdoor
staircases
on
several
low
income
housing
proper3es‐‐
specifically
Maryland
Heights,
Ram
Circle 












924,757
 50
Natchez MS Public
Safety Technology
Infrastructure
Improvements
Project‐‐Police,
Fire,
and
First
Responders.

This
much
needed
project

would
bring
our
public
safety
departments
up
to
speed
with
their
computer
equipment
and
network. 














90,000
 20
Natchez MS Transit Natchez
Transit
Facility
Improvements
Project.

This
project
would
allow
us
to
create
a
new,
modern
public

transit
facility
to
centralize
our
exisi3ng
transit
services.

Crea3on
of
this
facility
would
make
opera3ons
of
our

transit
system
more
economical 












700,000
 90
Natchez MS Water Water
and
Wastewater
Infrastructure
Improvement
Project.

This
project
would
thoroughly
modernize
our

exis3ng
water
and
wastewater
system,
providing
source
water
protec3on
and
a
higher
standard
of
public

safety
with
regard
to
city
water
and
sewer. 










4,000,000
 300
Oakland MS CDBG Pedestrian
improvements
‐
ADA
accessibility
improvements,
repair,
and
reconstruc3on
of
town
sidewalk

network. 












100,000
 6
Oakland MS CDBG Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
parking
and
ADA
accessibility. 












250,000
 12
Oakland MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 










1,000,000
 18
Oakland MS CDBG Water
and
sewer
improvements
‐
Extension
of
water
and
sewer
system
to
unserved
areas
of
town,
and
repair

and
replacement
of
exis3ng
water
and
sewer
system. 










1,500,000
 22
Pace MS CDBG Construct
Maintenance
Building
and
Fire
Sta3on
to
house
Town
equipment
preven3ng
theb
and
malicious

damages 












600,000
 5
Pace MS CDBG Renovate
en3re
Town
water
and
sewer
system 












450,000
 5
Pace MS CDBG Renova3on
of
exis3ng
Town
Hall
to
include
parking
and
ADA
accessibility 












450,000
 5
Pace MS CDBG Renovate
and
reconstruct
school
building
into
a
Mul3‐purpose
Center
to
address
needs
of
ci3zens 












800,000
 10
Pace MS Housing Construct
five
houses
for
first
3me
home
buyers 












450,000
 5
Pace MS Streets/Roads Street
improvement
of
en3re
Town
to
include
overlay,
curb,
gufer
and
drainage 












350,000
 5
Petal MS Streets/Roads Cochran
and
7th
Street
Drainage‐
This
project
consists
of
installa3on
of
roughly
900’
of
29”x18”
reinforced

concrete
pipe
to
replace
an
undersized
pipe
and
increase
capabili3es
to
relieve
stormwater
through
an
exis3ng

ditch.

 












165,000
 15
Petal MS Streets/Roads Herrington
Road
Signal‐
The
City
opened
bids
on
9‐10‐07
and
the
project
was
never
awarded
due
to
lack
of

funds.

This
project
was
to
help
traffic
movements
and
safety
for
the
new
school. 














85,000
 15
Petal MS Streets/Roads 8th
Ave
Curb
and
Gufer‐
This
project
involves
replacing
a
watermain,
stormwater
collec3on
system,
curb
and

gufer,
and
widening
the
roadway. 












370,000
 30
Petal MS Streets/Roads Highland
Circle
Drainage‐
The
project
consists
of
the
installa3on
of
various
size
corrugated
plas3c
pipe,

reinforced
concrete
pipe,
and
yard
inlets.

This
project
is
designed
to
eliminate
severe
drainage
problems
that

have
resulted
in
erosion
and
sedime 












475,000
 35
Petal MS Streets/Roads Hwy
42
@
Cameron
Road
Drainage‐
Petal
has
sought
funding
through
FHWA
because
during
Hurricane
Gustav

Petal
experienced
flooding
which
has
jeopardize
the
roadbed
on
this
federal
route.

This
project
replaces

exis3ng
undersized
culverts
 












485,000
 35
Petal MS Streets/Roads Tyner
Drive
Extension‐
This
project
is
currently
on
hold
due
to
the
econamic
downturn.

The
purpose
of
this

project
is
to
provide
an
access
road
to
Lowes
of
Petal.

The
development
of
the
new
Lowes
store
in
Petal

represents
a
significant
investment
 












305,000
 45
Petal MS Water Highway
11
Watermain‐
This
project
provides
fire
lines
for
the
annexed
area
along
Highway
11. 












350,000
 20
Petal MS Water Lib
Sta3on
Rehabilita3on‐
This
project
is
designed
and
approved
by
the
Mississippi
Department
of

Environmental
Quality.
This
project
will
rehabilitate
5
different
lib
sta3ons
acquired
by
the
purchase
of
Camco

U3li3es. 












560,000
 20
Petal MS Water Autumn
Ridge
Sewer
Expansion‐
This
project
provides
sewer
service
for
the
Autumn
Ridge
subdivision
that
was

annexed
by
the
City
of
Petal
approximately
six
years
ago. 












890,000
 25
Petal MS Water Hwy
11
Sewer
Expansion‐
This
project
provides
sewer
service
for
the
newly
annexed
areas
along
Highway
11. 












690,000
 25
Petal MS Water Sunrise
Road
Sewer
Extension‐
This
project
consists
of
the
installa3on
of
one
(1)
lib
sta3on
and
2,500
L.F.
of

gravity
sewer.
This
project
will
serve
the
Sunrise
Road
area
and
accept
wastewater
from
Pecan
Lakes
U3li3es

which
is
currently
being
discha 












980,000
 25
Petal MS Water Water
Plant
"C"
Aera3on‐
This
project
consists
of
the
installa3on
of
an
aerator
with
appurtenances
to
remove

contaminates
from
the
drinking
water. 












400,000
 25
Petal MS Water Sewer
Rehabilita3on‐
There
is
s3ll
roughly
35,000
linear
feet
of
concrete
lines
in
the
City
of
Petal
that
were
not

rehabilitated
in
the
last
CIPP
project.
The
City
bid
this
work
in
conjunc3on
with
the
awarded
project
as
an

alternate
but
was
unable
to
f 










1,000,000
 35
Rosedale MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 










2,500,000
 24
Rosedale MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on

and
treatment
system
for
en3re
town. 










3,000,000
 26
Sidon MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on

system
for
en3re
town. 












650,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Sidon MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 












750,000
 15
Sidon MS CDBG Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
administra3ve
offices,
community
mee3ng
area,
parking,

and
ADA
accessibility. 












325,000
 15
Sumner MS CDBG Pedestrian
improvements
‐
ADA
accessibility
improvements,
repair,
and
reconstruc3on
of
town
sidewalk

network,
including
addi3onal
landscaping
and
street
furniture. 












150,000
 10
Sumner MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on

system,
including
sewer
pump
sta3ons,
for
en3re
town. 












650,000
 15
Terry MS CDBG Construct
Library
(4,010
s.f.) 












328,000
 7.3
Terry MS Energy Rehabilita3on
of
Downtown
Facades
(including
awnings
for
Energy
savings) 












520,000
 11.5
Terry MS Streets/Roads Rehabilita3on
of
Cunningham
Avenue 












100,000
 2
Terry MS Streets/Roads Sidewalk
Replacement
(Downtown
Area) 












230,000
 5
Terry MS Streets/Roads Street
Rehabilita3on
(Overlay
All
Streets
East
of
Interstate
Route
55) 










1,171,000
 26
Terry MS Water Sewer
System
Rehabilita3on
‐

Cunningham
Ave.
(Interstate
Route
55
to
Railroad
Ave.);
U3ca
Street
(Beasley
Street
to
Sewer
Lagoon) 












552,000
 11.6
Terry MS Water Water
System
Rehabilita3on
Cunningham
Ave
(Interstate
Route
55
to
Railroad
Ave.);

U3ca
Street
(Beasley
St.
to
Sewage
Lagoon) 












690,000
 15.3
Terry MS Water Install
New
Water
Service
(annexed
area
along
Interstate
Route
55) 












700,000
 15.5
Terry MS Water Upgrade
Sewage
Treatment
Facility 










1,000,000
 22
Terry MS Water Install
New
Sewer
Service
(inside
exis3ng
corporate
limits) 










1,570,000
 35
Terry MS Water Install
New
Sewer
Service
(annexed
area
along
Interstate
Route
55) 










2,450,000
 54
Tutwiler MS CDBG Pedestrian
improvements
‐
ADA
accessibility
improvements,
repair,
and
reconstruc3on
of
town
sidewalk

network. 












125,000
 12
Tutwiler MS CDBG Water
and
sewer
improvements
‐
Extension
of
water
distribu3on
and
sewer
collec3on
to
unserved
areas
of

town. 












575,000
 20
Tutwiler MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 










1,500,000
 25
Webb MS CDBG Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
parking
and
ADA
accessibility. 












250,000
 12
Webb MS CDBG Water
and
sewer
improvements
‐
Extension
of
town
water
distribu3on
and
sewer
collec3on
system
to
adjacent

rural
water
district. 












675,000
 15
Webb MS CDBG Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. 












850,000
 20
Webb MS CDBG Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on

system
for
en3re
town. 










2,100,000
 24
Wesson MS CDBG Sidewalk
repairs
and
extensions 












426,000
 15
Wesson MS CDBG Development
of
a
recrea3onal
park
for
general
public
use 












856,000
 20
Wesson MS CDBG Reloca3on
of
u3lity
services
to
be
placed
underground 










2,500,000
 20
Wesson MS CDBG Development
of
a
Municipal
Complex
for
general
government
use,
public
library,
and
community
center 










1,840,000
 25
Wesson MS Streets/Roads Road
Resurfacing
and
Rehabilita3on
throughout
the
municipality 












923,000
 15
Wesson MS Water Wastewater
system
repairs
and
extensions
throughout
the
municipality 










1,500,000
 15
Wesson MS Water Water
system
repairs
and
extensions
throughout
the
municipality 










1,260,000
 15
Yazoo
City MS CDBG Cemetery
Barn
for
equipment 














90,000
 4
Yazoo
City MS CDBG 15th
Street
stormdrainage 












650,000
 5
Yazoo
City MS CDBG Oakes
Museum
Improvements 












200,000
 6
Yazoo
City MS CDBG Rubbis
Pit
Class
1
 












650,000
 15
Yazoo
City MS CDBG Triangle
Cultural
Center
Point
tuck
exterior
brick 












300,000
 15
Yazoo
City MS CDBG Drainage
Improvements 










1,000,000
 20
Yazoo
City MS CDBG 6th
Street
Stormwater
Pumpsta3on
and
forcemain 










2,000,000
 25
Yazoo
City MS Public
Safety Fire
Figh3ng
Equipment 














30,000

Yazoo
City MS Public
Safety Fire
vehicles
(4) 














80,000

Yazoo
City MS Public
Safety Class
A
Pumper
&
75
b
ladder
Truck 










1,000,000
 2
Yazoo
City MS Public
Safety Police
Evidence
Management
System 














16,000
 2
Yazoo
City MS Public
Safety Trainning/Garage
for
Fire
Department 












300,000
 2
Yazoo
City MS Public
Safety 4
Points
Fire
Sta3on 












750,000
 4
Yazoo
City MS Public
Safety Fire
Sta3on
Number
3 












750,000
 4
Yazoo
City MS Public
Safety Police
Computers 















6,000
 4
Yazoo
City MS Public
Safety Police
Patrol
Cars
(8) 












100,000
 4
Yazoo
City MS Public
Safety Bullet
Proof
vests
(30) 














90,000
 5
Yazoo
City MS Public
Safety Addi3onal
Police
Officers
(8) 












224,000
 8
Yazoo
City MS Public
Safety Downtown
Fire
Sta3on 










1,500,000
 9
Yazoo
City MS Schools Buses
(4)
and
one
van 












550,000
 4
Yazoo
City MS Schools Storage
Buildings 














25,000
 10
Yazoo
City MS Schools Upgrade
Electrical
and
Boiler
System 












400,000
 15
Yazoo
City MS Schools Rehab
Auditorium
at
Alterna3ve
School 














75,000
 20
Yazoo
City MS Schools Increase
techological
communica3ons 












500,000
 25
Yazoo
City MS Schools Rehabita3on
of
Yazoo
City
Junior
High
School 










3,000,000
 100
Yazoo
City MS Schools Crea3on
of
new
wing
at
McCoy
Elementary 










5,000,000
 150
Yazoo
City MS Schools Sports
Complex/Athle3c
Field
House 










1,500,000
 150
Yazoo
City MS Schools Upgrade
exis3ng
Central
Office
Facili3es
and
create
Professional
Development
Center 










2,500,000
 150
Yazoo
City MS Schools Upgrade
Webster
Elementary 










5,000,000
 150
Yazoo
City MS Streets/Roads Grand‐Gordon
Connector
Road 










6,000,000
 50
Yazoo
City MS Streets/Roads Street
Improvements 










4,300,000
 50
Yazoo
City MS Water Blue
Moon
Water
&
Sewer
improvements 














60,000
 4
Yazoo
City MS Water Water
Improvements 










3,000,000
 25
Yazoo
City MS Water Sewer
Improvements 










7,000,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
Bozeman MT Energy Water
Reclama3on
Plant
($64
million
contract
to
be
par3ally
awarded
November
2008)
–
methane
recovery

system/digester
gas
engine. 










1,000,000
 3
Bozeman MT Energy Water
Reclama3on
Plant
$64
million
contract
to
be
par3ally
(because
of
lack
of
funding)
awarded
November

2008

–
LEED
cer3fied
laboratory
&
administra3on
building. 










3,177,000
 8
Bozeman MT Public
Safety Op3com
system
traffic
preemp3on 












170,000
 2
Bozeman MT Public
Safety Fire
engine
3
–
sta3on
three
is
under‐construc3on
with
a
comple3on
date
of
June
2009













450,000
 3
Bozeman MT Public
Safety Design
police
sta3on
and
municipal
court. 










2,250,000
 4
Bozeman MT Water Lincoln
sewer
main 










1,100,000
 6
Bozeman MT Water Pilot
membrane
tes3ng
for
a
new
Water
Plant. 










1,200,000
 8
Darby MT Public
Safety wastewater
lagoon
to
protect
head
waters
of
the
Biferroot/colombia
river
system 










5,500,000
 10
Darby MT Water Water
main
extension
and
water
main
replacement.
replacement
of
ageing
water
tank.

 










3,675,000
 10
Missoula MT CDBG City
Shops
Upgrades;
community
services;
energy
efficiencies 










1,000,000
 17
Missoula MT CDBG Downtown
Redevelopment
and
Parks,
Silver
Park,
14‐acre
inner
city
park
with
cri3cal
trail
connec3ons,
public

boat
ramp
and
reconstruc3on
of
rail
trestle
providing
access
to
park;inner
city
recrea3on;
complete
trail

connec3ons;
rail/street
safe 










4,500,000
 77
Missoula MT Energy Replace
3
Community
Playgrounds;
kids,
health,
promote
environmental
stewardship;
improve
safety
for

children;
u3lize
green
materials
and
equipment 












600,000
 14
Missoula MT Energy Replace
15
Neighborhood
Playgrounds
2009,
spring;
kids,
health,
promote
environmental
stewardship;

improve
safety
for
children;
u3lize
green
materials
and
equipment;
local
area
benefit
$100,000
each 










1,500,000
 30
Missoula MT Energy Playfair
Park
infrastructure
expansion
&
replacement,
60‐acre
park;
kids,
health,
promote
environmental

stewardship;
reforesta3on;
LEED
cer3fied
irriga3on
system;
upgrade
exis3ng
park
environment;
regional
area

benefit 










2,000,000
 34
Missoula MT Energy Parks,
Development,
82
acre
Fort
Missoula
Regional
Park;
expand
large
park
environment;
kids,
health,

promote
environmental
stewardship;
reforesta3on;
LEED
cer3fied
irriga3on
system;
Historic
interpreta3on;

Tourism
and
regional
area
benefit 








20,500,000
 341
Missoula MT Public
Safety City/County
Facili3es,
Downtown
Redevelopment
Downtown
Police
Headquarters
and
County
Administra3ve
Building









36,000,000
 577
Missoula MT Streets/Roads Raflesnake
Gateway
Greenough;
safety;
pedestrian
improvements 












200,000
 4
Missoula MT Streets/Roads Hillview
Way
Reconstruc3on;
safety;
drainage 










3,500,000
 5
Missoula MT Streets/Roads Reserve/Mullan
Intersec3on;
safety;
traffic
capacity;
conges3on
mi3ga3on 












300,000
 6
Missoula MT Streets/Roads Traffic
Signal
LED
Upgrades;
citywide
energy
efficiency;
citywide
fuel
use
reduc3on 












600,000
 11
Missoula MT Streets/Roads Traffic
Signal
Op3miza3on;
traffic
opera3ons;
energy
savings;
conges3on
mi3ga3on 












800,000
 14
Missoula MT Streets/Roads Higgins/Beckwith
Roundabout;
urban
renewal;
traffic
safety;
conges3on
mi3ga3on 












900,000
 15
Missoula MT Streets/Roads Community
Sidewalks;
safety,
pedestrian
improvements 










1,000,000
 17
Missoula MT Streets/Roads North
Higgins
Streetscape,
Phase
I;
general
benefit;
conges3on
mi3ga3on;
improved
traffic
flow;
urban

renewal;
parking;
non‐motorized
traffic
safety
and
infrastructure
enhancements 










1,500,000
 27
Missoula MT Streets/Roads Scof
Street
Overpass
Reconstruc3on;
traffic
safety;
maintenance 










1,900,000
 31
Missoula MT Streets/Roads Miller
Creek
Road,
Briggs
to
"Y";
safety;
traffic
capacity;
conges3on
mi3ga3on 










2,000,000
 33
Missoula MT Streets/Roads Front
and
Main
Streets,
Convert
to
Two‐Way
Traffic;
improved
traffic
flow;
conges3on
mi3ga3on;
general

benefit 










2,000,000
 34
Missoula MT Streets/Roads Higgins
Streetscape,
Length
Of
Higgins
Street
From
Alder
To
Brooks
Streets
(complete
project);
general
benefit;

conges3on
mi3ga3on;
improved
traffic
flow;
urban
renewal;
non‐motorized
traffic
safety
&

infrastructure

enhancements 










4,000,000
 67
Missoula MT Streets/Roads Rails‐to‐Trails
Conservancy
(RTC)
2010
Campaign;
provide
alterna3ve
transporta3on;
traffic
and
conges3on

mi3ga3on;
enhance
air
quality
§
improve
physical
health;
improve
social
fabric;
less
expense
to
maintain
than
roads;
outdoor
ac3vity 








50,000,000
 806
Missoula MT Water Levee
Maintenance,
flood
protec3on 












300,000
 6
Missoula MT Water Sewer
Libsta3on
Reconstruc3on;
maintenance;
ground
water
protec3on 












800,000
 14
Missoula MT Water Grant
Creek
Flood
Control,
Debris
Removal
§
flood
protec3on 










1,000,000
 17
Missoula MT Water Storm
Drain
Reconstruc3on
§
flood
protec3on 










1,000,000
 17
Missoula MT Water Wastewater
Treatment
Plant
Odor
Control
§
nuisance
reduc3on 










2,500,000
 41
Missoula MT Water Airport
Sewer
Interceptor
system
capacity,
ground
water
protec3on 










2,500,000
 42
Missoula MT Water Clark
Fork
Riverbank
Restora3on,
Downtown
Redevelopment.
Both
river
banks
in
core
downtown
area,
Orange

to
Russell
Streets.
Requires
Corp
of
Engineers
involvement.
(2008
failed
funding
process 










5,000,000
 82
Missoula MT Water Wastewater
Treatment
Plant
Headworks‐
DEQ
treatment
permit
requirement
§
enhanced
treatment
process

improvements 










6,700,000
 108
Shelby MT Airport Runway
Extension 








15,000,000
 60
Shelby MT Amtrak Amtrak
Depot
Improvements
 












200,000
 10
Shelby MT CDBG Civic
Center
Energy
Retrofit 










1,000,000
 15
Shelby MT CDBG Storm
Drainage 










5,000,000
 30
Shelby MT Energy Biolubricants
Plant
Infrastructure 








10,000,000
 200
Shelby MT Housing Rural
Rental
Housing
Improvements 












300,000
 15
Shelby MT Schools Historic
Shelby
High
School
Distant
Learning
Center
Development
 










5,000,000
 50
Shelby MT Streets/Roads Quite
Zone
Construc3on 












400,000
 10
Shelby MT Streets/Roads City
Street
Paving 










4,000,000
 20
Shelby MT Streets/Roads Shelby
Interchange 










7,000,000
 20
Shelby MT Streets/Roads South
Front
Street
Paving 










2,000,000
 20
Shelby MT Streets/Roads Viaduct
Can3lever
Walkway 












750,000
 20
Shelby MT Streets/Roads Viaduct
Construc3on 










4,000,000
 20
Shelby MT Transit Transit
HUB
Facility 










1,000,000
 6
Shelby MT Transit Energy
Park
Rail
Infrastructure 










4,000,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
Shelby MT Water Wastewater
Ouzlow
Project 










1,500,000
 7
Shelby MT Water Water
Well
Field
Improvements 










2,500,000
 20
Shelby MT Water Water
Line
Rehabilita3on
 










3,000,000
 25
Shelby MT Water Sewage
Treatment
Expansion
 










6,000,000
 30
Shelby MT Water West
End
12‐Inch
Water
Line
Interceptor
Project 










3,500,000
 30
Asheville NC CDBG Upgrade
parks
to
become
ADA
assessible












1,700,000
 24
Asheville NC Streets/Roads Beaverdam
Road
sidewalk













400,000
 4
Asheville NC Streets/Roads Traffic
Signal
at
Charlofe
and
Edwin
Place 














70,000
 5
Asheville NC Streets/Roads Traffic
Signal
Upgrade
at
Charlofe
and
Chestnut
 














60,000
 5
Asheville NC Streets/Roads McDowell
Street
sidewalk 












600,000
 6
Asheville NC Streets/Roads Complete
Wayfinding
Project 












600,000
 10
Asheville NC Streets/Roads Hendersonville
Road
sidewalk 










4,000,000
 40
Asheville NC Transit installa3on
of
bus
stops 














40,000
 2
Asheville NC Transit Bike
racks 














40,000
 5
Asheville NC Transit Bike
Lockers 














40,000
 10
Asheville NC Transit Replacement
buses 










4,400,000
 40
Asheville NC Water Black
Mountain
Pumping
Sta3on 












100,000
 5
Asheville NC Water Mills
River
Pumping
Sta3on 












200,000
 5
Asheville NC Water North
Fork
High
Pressure
Pumping
Sta3on 












100,000
 5
Asheville NC Water Walnut
Cove
Pumping
Sta3on 












300,000
 5
Asheville NC Water Brian
and
Burton
Street
drainage/Roadway 












400,000
 6
Asheville NC Water Old
Toll
Road
Drainange/Roadway 












400,000
 6
Asheville NC Water Victoria
Road
Drainange/Roadway 












500,000
 10
Charlofe NC Energy Fire
Sta3on
#39
Photo
Voltaic
System 












100,000
 3
Charlofe NC Energy Energy
Efficient
Ligh3ng
Replacement
At
Mul3ple
City
Bldgs 












200,000
 6
Charlofe NC Energy AC
Upgrades
(Fire
Sta3ons
8
&
35;
CMPD
Computer
Room) 












300,000
 8
Charlofe NC Energy Charlofe‐Mecklenburg
Police
Department
Green
Roof 












300,000
 8
Charlofe NC Energy Animal
Control
Green
Roof 












400,000
 12
Charlofe NC Energy CMU
‐
A/C
Equip.
Upgrade 










1,000,000
 28
Charlofe NC Energy Discovery
Place
Chiller 










1,000,000
 28
Charlofe NC Energy U3li3es
Opera3ons
Center
‐
LEED
Cer3fica3on 








12,000,000
 336
Charlofe NC Streets/Roads ITS
Mgmt
Op3miza3on 










1,500,000
 42
Charlofe NC Streets/Roads Central
Ave.
Improve.
At
Eastland
Mall 










2,000,000
 56
Charlofe NC Streets/Roads Ped.
Safety/Sidewalks 










2,600,000
 72
Charlofe NC Streets/Roads Thomasboro/Hoskings
Neighborhood
Improve.
Ph
3 










3,000,000
 84
Charlofe NC Streets/Roads Belmont
Neighborhood
Improve.
(Seigle
Ave
&
Gateways) 










3,200,000
 90
Charlofe NC Streets/Roads ITS
Traffic
Mgmt
Expan. 










5,000,000
 140
Charlofe NC Streets/Roads Intersec3on
Improvements 










7,400,000
 207
Charlofe NC Streets/Roads Lifle
Rock
Rd
Realign. 










8,000,000
 224
Charlofe NC Streets/Roads Dixie
River
Road 








13,000,000
 364
Charlofe NC Streets/Roads NC29/US49
Widening
Ph
2
‐
N.
Trying
Street 








13,000,000
 364
Charlofe NC Streets/Roads Fred
D.
Alexander
Blvd
(Sec3ons
B2
&
C) 








22,000,000
 616
Charlofe NC Transit Park
and
Ride
Lots 








10,000,000
 280
Charlofe NC Transit Transp.
Center
Rehab 








15,000,000
 420
Charlofe NC Transit N.
Davidson
Maint.
Facility 








30,000,000
 840
Charlofe NC Transit North
Corridor
Rail
Line
Grade
Crossings 








30,000,000
 840
Charlofe NC Transit Bus
Purchase 








90,000,000
 2520
Charlofe NC Transit LYNX
Blue
Line
Enhancements 






110,000,000
 3080
Charlofe NC Transit North
Corridor
Rail
Line 






335,000,000
 9380
Charlofe NC Water Beaqes
Ford
Watermain 












600,000
 16
Charlofe NC Water Burstonwood
Storm
Drain. 










1,000,000
 28
Charlofe NC Water Rockland
Rd
Culver
Repl. 










1,000,000
 28
Charlofe NC Water Wilora
Lake
Rehab. 










1,000,000
 28
Charlofe NC Water Griffith
Street
Libsta3on
Upgrade 










1,600,000
 45
Charlofe NC Water McAlpine
Wastewater
Treatment
Plant
Filter
Expansion
Design 










1,600,000
 45
Charlofe NC Water Storm
Drain
Repairs 










2,000,000
 56
Charlofe NC Water Stream
Restora3on 










2,000,000
 56
Charlofe NC Water Wastewater
Collec3on
System
Hydraulic
Models 










2,000,000
 56
Charlofe NC Water Wastewater
Collec3on
System
Rehabilita3on 










4,500,000
 126
Charlofe NC Water McAlpine
Relief
Sewer
Phase
2 








20,000,000
 560
Charlofe NC Water Franklin
Water
Plant
Reservoir
Expansion 








35,000,000
 980
Charlofe NC Water Reedy
Creek
Wastewater
Collec3on
System 








39,000,000
 1092
Concord NC Airport Apron
Addi3on
‐
construct
an
addi3onal
apron
on
the
northern
end
of
the
airport
runway 










1,080,000
 12
Concord NC Airport Apron
Overlay
‐
overlay
surface
to
repair
aged
asphalt
and
provide
support
for
larger
aircrab 










2,790,000
 12
Concord NC Airport Taxiway
Overlay
‐
overlay
surface
to
repair
aged
asphalt
and
provide
support
for
larger
aircrab 










2,950,000
 12
Concord NC Airport Runway
Improvements
‐
overlay
surface
to
repair
aged
asphalt
and
provide
support
for
larger
aircrab,
improve

runway
ligh3ng 










1,022,800
 15
Concord NC Airport Hanger
Addi3on
‐
construct
a
new
hanger
to
provide
office
space
and
room
for
larger
aircrab 










3,300,000
 20
Concord NC Housing Beverly
Hills
Park
Restroom
‐
construc3on
of
a
restroom
building
at
an
exis3ng
park
on
Miramar
Street 














95,000
 8
Concord NC Housing McInnis
Aqua3c
Center
Remodeling
‐
renova3on
of
the
entrance
to
the
pool
building
to
enhance
security
at

the
window
and
shower
rooms 














15,000
 8
Concord NC Housing Recrea3on
Center
Upgrades
‐
demoli3on
and
construc3on
to
create
a
front
desk/recep3on
area
and
offices
at

Hartsell
Recrea3on
Center
and
Logan
Mul3‐Purpose
Center 














45,000
 8
Concord NC Housing Rocky
River
Greenway
(Moss
Creek
Phase)
‐
improvements
to
the
Rocky
River
Greenway
between
Highway
73

and
Harris
Road 










1,000,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Concord NC Public
Safety Fire
Sta3on
#5
Renova3on
‐
renova3on
of
exis3ng
fire
sta3on
to
provide
needed
space
in
the
apparatus
bay

and
housing
for
an
addi3onal
ladder
company 










1,325,250
 8
Concord NC Streets/Roads Street
Improvements
‐
pave/rehabilitate
20
miles
of
municipal
street
infrastructure 










2,500,000
 16
Concord NC Streets/Roads Morehead
Road
Realignment
‐
realignment
of
exis3ng
road
between
US
29
and
Performance
Drive
to
match

new
bypass
alignment
and
separate
pedestrian
and
vehicular
movement
near
speedway 










8,000,000
 50
Concord NC Streets/Roads Weddington
Road/Bruton
Smith
Boulevard
Intersec3on/Corridor
Improvements
‐
intersec3on/corridor

improvements
to
facilitate
the
movement
of
traffic
in
a
tourism
area
crea3ng
significant
conges3on
mi3ga3on

impac3ng
Interstate
85 








16,000,000
 120
Concord NC Water Franklin
Street
Stormwater
Sewer
‐
realignment
of
100
feet
of
42‐inch
stormwater
sewer 














40,000
 5
Concord NC Water Georgia
Street
Culvert
‐
replacement
of
aging
infrastructure 












198,000
 5
Concord NC Water Glenwood
Drive
Culvert
‐
replacement
of
aging
infrastructure 














40,000
 5
Concord NC Water James
Street
Culvert
‐
replacement
of
aging
infrastructure 












198,000
 5
Concord NC Water Long
Avenue
Waterline
‐
replacement
of
approximately
1,400
feet
of
6‐inch
waterline 












186,000
 5
Concord NC Water Melrose
Avenue
Culvert
‐
replacement
of
aging
infrastructure 












156,000
 5
Concord NC Water Princess
Street
and
Crowell
Drive
Culvert
‐
replacement
of
aging
infrastructure 












156,000
 5
Concord NC Water Wolf
Meadow
Elementary
Waterline
‐
installa3on
of
approximately
2,200
feet
of
waterline
required
due
to
the

closure
of
Philip
Morris 












130,000
 5
Concord NC Water Woodsdale
Place
Waterline
‐
replacement
of
approximately
220
feet
of
6‐inch
waterline 














40,000
 5
Concord NC Water Young
Street
Culvert
‐
replacement
of
aging
infrastructure 












198,000
 5
Concord NC Water Havencrest
Sewer
Ouzall
‐
replacement
of
approximately
6,100
feet
of
sanitary
sewer
serving
a
por3on
of
the

area
near
Poplar
Tent
and
I‐85 












796,500
 6
Concord NC Water Hendrick
Sewer
Ouzall
‐
upsizing
of
approximately
1,100
feet
of
sanitary
sewer
to
accommodate
future
growth

in
the
speedway
area 












609,000
 6
Concord NC Water Irish
Buffalo
Downtown
Sewer
Ouzall
‐
replacement
of
approximately
4,300
feet
of
sanitary
sewer
serving
part

of
the
downtown
area 












520,000
 6
Concord NC Water Morrison
Road
Pump
Sta3on
Elimina3on
‐
extension
of
gravity
sanitary
sewer
to
eliminate
the
need
for
a

wastewater
pump
sta3on
nearing
the
end
of
its
useful
life 












316,000
 6
Concord NC Water Triangle
Area
Water
Tank
‐
installa3on
of
a
2
MG
elevated
water
tank
to
enhance
water
storage
and
stabilize

system
pressures
in
the
western
area
of
the
city 










5,200,000
 6
Concord NC Water Wilson
Street
Culvert
‐
replacement
of
aging
infrastructure 












350,000
 6
Concord NC Water Irish
Buffalo
to
Zion
Church
Sewer
Phase
1
‐
replacement
of
approximately
1,956
feet
of
sanitary
sewer
and

upgrades
to
an
exis3ng
ouzall 












190,000
 8
Concord NC Water Rocky
River
Golf
Course
Sewer
Ouzall
‐
replacement
of
approximately
2,500
feet
of
sanitary
sewer
serving
an

area
along
Bruton
Smith
Boulevard 












787,500
 8
Durham NC CDBG AMERICAN
TOBACCO
TRAIL
PHASE
E
(INCLUDES
PEDESTRIAN
BRIDGE
OVER
I‐40) 










2,459,617
 16
Durham NC CDBG APEX
STREET
BRIDGE 












300,000
 8
Durham NC CDBG FRIENDLY
REST
HOME
RENOVATION
(PUBLIC
WORKS
WELLNESS
CENTER) 












800,000
 10
Durham NC CDBG NC
147
PEDESTRIAN
BRIDGE 












200,000
 12
Durham NC CDBG SIGN
&
SIGNAL
SHOP 










1,000,000
 12
Durham NC CDBG C.M.
HERNDON
PARK
‐
THIS
PROJECT
CONSTRUCTS
STORMWATER
UTILITY
UPGRADES
TO
REGIONAL
ATHLETIC

PARK 














24,000
 5
Durham NC CDBG CORNWALLIS
ROAD
PARK‐THIS
PROJECT
WILL
REPLACE
PLAYGROUND
THAT
IS
CURRENTLY
NOT
MEETING
LEVEL‐
OF‐SERVICE
OR
SAFETY
STANDARDS 












178,000
 10
Durham NC CDBG DURHAM
SKATEBOARD
PARK‐THIS
PROJECT
IS
FOR
THE
CONSTRUCTION
OF
DURHAM'S
FIRST
SKATEBOARD

FACILITY. 












431,000
 15
Durham NC CDBG NORTHGATE
PARK
RENOVATION/UPGRADE‐THIS
PROJECT
WILL
CONSTRUCT
NEW
ELEMENTS
IN
NORTHGATE

PARK
AND
UPGRADES
THE
28‐ACRE
PARK.
PROJECT
REPAIRS
INCLUDE
LIGHTING,
ELECTRICAL,
PLAYGROUNDS

AND
GREENWAY
TRAIL. 












317,000
 15
Durham NC CDBG LYON
PARK
UPGRADE‐RENOVATION
OF
LYON
PARK
INCLUDING
IMPROVEMENTS
TO
THE
PLAYGROUND,

PEDESTRIAN
CIRCULATION,
PARKING
AND
ADA
ACCESS
TO
FEATURES,
LANDSCAPING
AND
NEW
SITE
AMENITIES













533,000
 20
Durham NC CDBG OLD
LYON
PARK
CENTER
RENOVATION‐THIS
PROJECT
WILL
RENOVATE
THE
OLD
LYON
PARK
RECREATION

CENTER
TO
MAKE
IT
ACCESSIBLE
AND
USABLE
AS
A
YOUTH
CENTER 












881,000
 35
Durham NC CDBG PARRISH
ST.
MUSEUM
WITHOUT
WALLS 










2,500,000
 50
Durham NC CDBG THIRD
FORK
CREEK
TRAIL‐3.5
MILES
OF
PEDESTRIAN
GREENWAY
TRAIL
THAT
CONNECTS
SOUTHERN

BOUNDARIES
AND
GARRETT
ROAD
PARKS;
ALSO
INCLUDES
DRAINAGE,
LANDSCAPING,
UTILITIES,
CREEK

CLEANUP
BOARDWALK
CONSTRUCTION
AND
SITE
AMENITIES. 










2,497,000
 90
Durham NC CDBG DURHAM
STATION
PUBLIC‐PRIVATE
PARTNERSHIP 










5,000,000
 100
Durham NC CDBG NEIGHBORHOOD
PUBLIC‐PRIVATE
PARTNERSHIP 










2,000,000
 100
Durham NC CDBG OLD
CHAPEL
HILL
ROAD
PARK‐THIS
PROJECT
DESIGNS
AND
CONSTRUCTS
A
24‐ACRE
PARK
NEXT
TO
GITHENS

MIDDLE
SCHOOL
WITH
SOCCER
FIELDS,
BASKETBALL
COURT,
TRAILS
AND
PARKING. 










3,353,000
 120
Durham NC CDBG BETHEDSA
PARK‐THE
CURRENT
FUNDING
FOR
THIS
PROJECT
DESIGNS
AND
CONSTRUCTS
A
20‐ACRE
PARK

WITH
COMMUNITY
BUILDING,
COVERED
SPORT
COURTS,
DISC
GOLF
COURSE,
WALKING
TRAILS,
PLAYGROUND,

AND
PARKING 










4,245,000
 150
Durham NC CDBG NEIGHBORHOOD
COMMERCIAL
STREETSCAPES 








25,000,000
 200
Durham NC Streets/Roads CLAREMONT
CULVERT
REPLACEMENT 












750,000
 16
Durham NC Streets/Roads FAYETTEVILLE
ST/RIDDLE
RD
IMPROVEMENTS 












300,000
 10
Durham NC Streets/Roads LIGGETT/WEST
VILLAGE
STREETSCAPE 










8,900,000
 18
Durham NC Streets/Roads MAIN
&
DILLARD
CULVERT 












500,000
 12
Durham NC Streets/Roads MARKHAM
STREET
CULVERT 










2,000,000
 24
Durham NC Streets/Roads SIDEWALK/ADA
CURB
RAMPS 










6,212,600
 20
Durham NC Streets/Roads STREET
RESURFACING 








10,000,000
 45
Durham NC Streets/Roads TRINITY
AVE.
CULVERT
REPLACEMENT 










1,500,000
 20
Durham NC Streets/Roads PAVE
DIRT
STREETS 








22,000,000
 36
Durham NC Transit NEW
DATA
OPERATIONS
FACILITY 










1,076,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Durham NC Water FLOATING
WETLAND 














45,000
 8
Fayefeville NC Airport Install
computerized
energy
management
system
for
ligh3ng
and
HVAC
control
in
the
terminal
building
and

add
window
shades
on
the
west
window‐wall.
 














55,000
 1
Fayefeville NC Airport Replace
airport
terminal
window
with
energy
saving
coated
materials. 










2,000,000
 10
Fayefeville NC Airport Fire
drill
tower
replacement
on
airport
property.

 










1,250,000
 20
Fayefeville NC CDBG Purchase
4
hybrid
rear‐loading
garbage
trucks.

 












840,000
 3
Fayefeville NC CDBG Replace
7
fire
vehicles
with
hybrid
preven3on
vehilces.
 












161,000
 5
Fayefeville NC CDBG Storm
Drainage
improvement
projects
using
best
management
prac3ces
and
low
impact
development

prac3ces
to
improve
quality
of
life
for
residents
and
water
quality
in
streams. 










1,000,000
 12
Fayefeville NC CDBG Replace
solid
waste
general
fleet
with
hybrid
fuel
vehilces.
 










2,000,000
 14
Fayefeville NC CDBG Installa3on
of
5‐foot
concrete
sidewalks
along
thoroughfares.. 










5,000,000
 20
Fayefeville NC CDBG Specific
street
improvements
to
include
sidewalk
construc3on. 










6,500,000
 25
Fayefeville NC CDBG Construct
Fayefeville
Community
Gardens
(20
acres).
 












500,000
 30
Fayefeville NC CDBG Construct
"Walkable
Community
Blount's
Creek
Trail".
 












700,000
 43
Fayefeville NC CDBG Construct
Linear
Park
Trail
Phase
3.
 












850,000
 43
Fayefeville NC CDBG Construc3on
of
2
new
fire
sta3ons. 










2,500,000
 75
Fayefeville NC CDBG Construct
North
Carolina
Veteran's
Park
Visitors
and
Training
Center.
 










2,500,000
 80
Fayefeville NC CDBG Downtown
street
repair
and
resurfacing
and
streetscape
improvements
to
spur
residen3al
and
commercial

economic
development
in
the
central
city. 










2,500,000
 115
Fayefeville NC Energy Install
Solar
Panels
on
PWC
campus 












350,000
 1
Fayefeville NC Energy Green
Retrofit
of
Solid
Waste
Office
Facility.
 














95,000
 2
Fayefeville NC Energy Install
2,500
Cleartricity
meters
and
suppor3ng
Gateway,
fed
by
PWC
substa3on
transforner. 










1,000,000
 6
Fayefeville NC Energy Act
on
Energy
Audit
Recommenda3ons.

Install
energy
saving
upgrades
to
City
owned
buildings
per
consultant

recommenda3ons
. 










4,000,000
 22
Fayefeville NC Energy Retrofit
of
15
City
Fire
Sta3ons
for
Energy
savings.. 










4,500,000
 22
Fayefeville NC Public
Safety Purchase
hybrid
vehilces. 












480,000
 0
Fayefeville NC Public
Safety Purchase
Segway
Scooters
puqng
more
officers
on
the
streets. 














12,000
 0
Fayefeville NC Public
Safety Construct
a
daycare
for
employees. 












500,000
 20
Fayefeville NC Public
Safety Construc3on
of
Police
Training
Center. 










1,416,781
 22
Fayefeville NC Public
Safety Contruc3on
of
Forensic
ID
Tech
Building. 










2,500,000
 22
Fayefeville NC Public
Safety Construc3on
of
a
Public
Safety
Sta3on. 










4,625,000
 122
Fayefeville NC Streets/Roads 15
Video
Surveillance
Cameras
for
ITS/Incident
management.

Fawyefeville,
NC 












400,000
 4
Fayefeville NC Streets/Roads Streetlight
conversion.

Replacing
18,696
tradi3onal
streetlights
with
more
energy
efficient
LED
lights
on

residen3al
streets
and
thoroughfares. 








18,696,000
 6
Fayefeville NC Streets/Roads US
401
Bypass
at
Morganton
Road
‐Construct
a
right
turn
lane
on
US
401
Bypass
and
a
right
turn
lane
on

Morganton
Road.
 












700,000
 12
Fayefeville NC Streets/Roads Paving
6444
feet
of
soil
streets 












841,220
 40
Fayefeville NC Transit Purchase
8
hybrid
buses. 










4,500,000
 10
Fayefeville NC Transit Construct
a
mul3modal
center. 








15,000,000
 50
Fayefeville NC Water Garbage
truck
wash
reloca3on
and
rebuild
using
a
reclaimed
and
recycled
water
system.

The
system
needs
a

reclama3on
system,
oil/water
separator,
canopy,
drains
and
pipe
to
the
sanitary
sewer
system. 












150,000
 3
Fayefeville NC Water Install
public
sanitary
sewer
services
in
exis3ng
high
density
neighborhoods
to
approximately
480
proper3es.



This
includes
approximately
7
miles
of
sanitary
sewer
main,
a
lib
sta3on
and
a
force
main.

The
purpose
of
the

project
is
to
provide
the
cit 










8,561,000
 120
Gastonia NC Amtrak Gastonia
Mul3‐Modal
Transporta3on
Center
‐
AMTRAK
INFRASTRUCTURE
ONLY
‐
Including
track

improvements,
new
track,
and
new
plazorm. 










5,000,000
 50
Gastonia NC CDBG Highland
Rail
Trail
Parking
Lot
‐
Project
includes
construc3on
of
a
parking
area
for
the
Highland
Rail
Trail. 














60,000
 10
Gastonia NC CDBG Lineberger
Park/Greenway
Parking
Lot
‐
Project
includes
paving
a
gravel
lot
that
provides
parking
for
park

visitors. 














50,000
 15
Gastonia NC CDBG Highland
Rail
Trail,
Phase
III
‐
Connects
exis3ng
rail‐trail
to
Rankin
Lake
Park. 












700,000
 20
Gastonia NC CDBG Lineberger
Park
Pool
Renova3on
‐
This
project
will
consist
of
pool
and
bath
house
renova3ons. 












500,000
 20
Gastonia NC CDBG Gum‐Ida‐Hemlock
Storm
System
Upgrade
‐
The
project
upgrades
the
exis3ng
stormwater
management
system

in
an
economically
distressed
area
where
exis3ng
storm
drain
piping
and
drain
structures
are
failing. 












600,000
 30
Gastonia NC CDBG Mariefa
Street
Pedestrian
Project
‐
Located
in
the
heart
of
Gastonia’s
central
business
district,
enhancements

include
adding
a
10’‐14’
wide
pedestrian
walk
on
the
bridge
and
installing
decora3ve
landscaping
planters
and

light
bollards. 












560,000
 40
Gastonia NC CDBG South@Main
Pavilion
Park
‐
Development
of
a
downtown
park/plaza
to
act
as
a
focal
point,
afrac3ng
visitors,

downtown
employees
and
the
general
public
to
the
Center
City. 












770,000
 40
Gastonia NC CDBG Rankin
Lake
Park
Improvements
‐
Paved
trail
around
exis3ng
80
acre
lake,
corporate
picnic
pavilion,
piers
&
docks,
playground,
picnic
shelters,

new
roof
&
façade
for
exis3ng
clubhouse,
&
lake
warden
sta3on. 










1,700,000
 45
Gastonia NC CDBG Lineberger
Park
Phase
II
‐
Project
includes
the
addi3on
of
restrooms,
a
greenway
trail
extension,
picnic
shelter
renova3ons,
a
small

amphitheatre,
playground,
&
carousel. 










1,500,000
 50
Gastonia NC CDBG Downtown
Parking
Deck
‐
Includes
construc3on
of
a
300‐space
parking
deck
in
downtown
Gastonia
in
concert

with
other
projects
in
downtown,
including
PROJECT
BIG
SPLASH. 










5,400,000
 120
Gastonia NC CDBG Gastonia
Mul3‐Modal
Transporta3on
Center
‐
(EXCLUDING
Amtrak
costs)
Project
includes
facility
construc3on

and
opera3on
of
Gastonia
Transit,
Gaston
County
Access,
Amtrak,
Greyhound,
and
Express
Bus
routes
to

Charlofe. 








15,000,000
 300
Gastonia NC CDBG Project
BIG
SPLASH
‐
An
acronym
for
"Bringing
Investment
to
Gastonia
in
Support
of
a
Project
Linking
Aqua3cs,

Sports
and
Hospitality."

Project
includes
an
aqua3cs
center,
fitness
facility,
and
quality
mee3ng
space.









10,000,000
 350
City State Program Project
Descrip3on Funding
Required Jobs
Gastonia NC Public
Safety Police
800
mgh
radio
project
‐
Ini3al
infrastructure
was
built
and
paid
for
through
UASI
funding.
The
actual

radios
need
to
be
funded
to
complete
the
project.
 










1,200,000
 10
Gastonia NC Public
Safety Fiber
Op3c
Extension
to
Mul3ple
Cell
Tower
Sites
to
increase
communica3on
op3ons
for
public
and
private

sectors. 












250,000
 20
Gastonia NC Public
Safety Northwest
Gastonia
Fire
Sta3on
‐
Build
Fire
Sta3on
in
the
area
due
to
coverage
and
ISO
requirements
for
effec3ve
coverage
in
the
area.


Purchase
would
include
property
and
construc3on
costs
es3mated
at
$4.5
M. 










4,500,000
 80
Gastonia NC Public
Safety Southeast
Gastonia
Fire
Sta3on
‐
Build
Fire
Sta3on
in
the
area
due
to
coverage
and
ISO
requirements,
pending

further
development
in
the
area.

Purchase
would
include
property
and
construc3on
costs
es3mated
at
$4.5

M. 










4,500,000
 80
Gastonia NC Streets/Roads Gastonia
Industrial
Park
Street
Improvements
‐
Paving
of
dirt
street
that
would
provide
an
interconnect

between
two
exis3ng
industrial
parks.

The
improvements
would
be
within
the
Gastonia
Industrial
Park
off

Bessemer
City
Road. 












250,000
 15
Gastonia NC Streets/Roads Paving
of
stone
streets
in
economically
depressed
areas
of
Gastonia.

Street
paving
would
include
Red3p,

Heart,
Chesser,
and
Edison
Streets.

Property
owners
have
pe33oned
the
City
for
upgrades
and
the
City
will

maintain
aber
brought
up
to
standards. 












300,000
 20
Gastonia NC Streets/Roads The
City’s
“missing
link”
sidewalk
list
targets
areas
where
new
sidewalks
would
add
important
connec3ons

within
areas
of
high
pedestrian
ac3vity.

Projects
are
typically
located
near
the
Center
City,
schools,
shopping

areas,
and
neighborhoods. 












750,000
 25
Gastonia NC Streets/Roads Highland
Neighborhood
Street
and
Streetscape
Improvements
‐
Project
includes
street
and
drainage
improvements,
underground
electric
u3li3es,
curb
and
gufering
and

sidewalks
within
an
inner
city
residen3al
revitaliza3on
area. 










1,200,000
 50
Gastonia NC Streets/Roads Pavement
Maintenance/Reconstruc3on

‐
A
2006
Pavement
Condi3on
Survey
found
that
nearly
22%
of
the

streets
in
the
City
need
some
level
of
maintenance,
which
includes
patching,
crack
pouring,
short
overlays
and

plant
mix
resurfacing. 










2,100,000
 55
Gastonia NC Streets/Roads Gaston
Mall
Redevelopment
Partnership
‐
The
$37M
project
includes
redeveloping
a
185,000
square
foot

major
retail
center.

Private/Public
investment
to
construct
new
roadway
connec3ng
two
major
thoroughfares,

at
one
of
our
most
congested
intersec3ons. 










3,100,000
 75
Gastonia NC Water Fairview
Road
Water
Line
‐
Project
connects
the
City’s
premier
industrial
park
to
City
water
service
to

accommodate
future
development.

The
project
would
extend
water
lines
between
Technology
Parkway
and

Fairview
Drive. 












550,000
 30
Gastonia NC Water Long
Creek
WWTP
Electrical
System
Improvements
‐
Improvements
to
prevent
single
point
failures
that
could

result
in
catastrophic
failure
of
the
wastewater
treatment
process
and
subsequent
damage
to
the
environment

and
threat
to
public
health.
 










1,500,000
 50
Gastonia NC Water Water
Treatment
Plant
(Downtown)
Upgrades
‐Immediate
structural
and
electrical
upgrades
to
maintain

current
water
treatment
capacity. 










1,300,000
 50
Gastonia NC Water Sewer
Rehabilita3on
Projects
‐
Rehabilita3on
of
exis3ng
sewer
lines
iden3fied
in
a
recent
study.

Projects
will

include
rehabilita3on
of
sewer
lines
and
manholes
to
reduce
infiltra3on
and
inflow
into
the
sanitary
sewer

system.
 










6,400,000
 60
Gastonia NC Water Water
Service
to
Crowders
Mountain
‐
Project
includes
construc3on
of
water
lines,
a
booster
sta3on,
and

storage
tank
for
western
pressure
zone
needs
at
Crowders
Mountain
State
Park. 










8,500,000
 65
Gastonia NC Water Water/Sewer/Electrical
Service
to
Paysour
Mountain
‐
Project
provides
water,
sewer,
and
electrical
service
to

the
Paysour
Mountain
Technology
Park
for
homeland
security
and
alternate
energy
research.

($7.7M
water,

$8.5M
sewer,
$400,000
electrical) 








16,000,000
 75
Gastonia NC Water Regional
Biosolids
Dewatering/Drying
Facility
‐
Land
applica3on
of
Class
B
wastewater
treatment
residuals
may

not
be
sustainable
long‐term.

A
regional
facility
was
outlined
in
a
recent
study
and
could
be
constructed
at
the

Long
Creek
WWTP
site. 








20,000,000
 100
Gastonia NC Water Update/Up‐rate
Exis3ng
Water
Treatment
Plant
to
30
MGD
(max)
and
add
membrane
filters.
Includes

demolishing
some
and
up‐ra3ng
other
filters.

Effluent
from
these
filters
would
then
be
further
treated
using

membrane
technology. 








75,000,000
 100
Gastonia NC Water Southeast
Wastewater
Treatment
Plant
‐
Project
replaces
the
exis3ng
pump
sta3ons
in
southeast
Gastonia

with
a
wastewater
treatment
plant
to
address
extensive
growth
in
this
area. 








13,000,000
 120
Rocky
Mount NC Airport Land
acquisi3on
for
obstruc3on
removal 












675,000
 1
Rocky
Mount NC Airport Terminal
enhancements 












200,000
 2
Rocky
Mount NC Amtrak Upgrades
to
Amtrak
customer/traveler
ameni3es
at
City‐owned
Train
Sta3on 












300,000
 5
Rocky
Mount NC CDBG Build
shelter
at
(under
construc3on)
Three
Sisters'
Park
in
Bafleboro
Community 














60,000
 2
Rocky
Mount NC CDBG Replace
light
poles
at
City
parks 














20,000
 2
Rocky
Mount NC CDBG Install
and
replace
playground
equipment
at
City
parks 












125,000
 3
Rocky
Mount NC CDBG Install
fencing
to
improve
security
at
City
parks 














60,000
 4
Rocky
Mount NC CDBG Construct
8
shelters
at
City
parks
that
need
addi3onal
or
replacement
shelters 












250,000
 5
Rocky
Mount NC CDBG Demolish
old
City
theatre
(not
inhabitable)
and
convert
site
to
community
use 












250,000
 5
Rocky
Mount NC CDBG Redevelopment
of
former
site
of
Planters
Oil
Mill 












500,000
 5
Rocky
Mount NC CDBG Renovate
unused
por3on
of
City‐owned
Senior
Center
for
use
as
employee
fitness
center 












250,000
 5
Rocky
Mount NC CDBG Replace
gymnasium
floor
and
repaint
at
South
Rocky
Mount
Community
Center 












250,000
 5
Rocky
Mount NC CDBG Replace
gymnasium
floor
at
Booker
T.
Washington
Community
Center 












125,000
 5
Rocky
Mount NC CDBG Resurface
35
tennis
courts
at
10
City
parks,
all
in
need
of
resurfacing 












175,000
 5
Rocky
Mount NC CDBG Resurface
12
City
park
basketball
courts,
all
over
25
years
old 














70,000
 6
Rocky
Mount NC CDBG Complete
remaining
phases
of
Rocky
Mount
Sports
Complex 










1,200,000
 10
Rocky
Mount NC CDBG Complete
renova3on
of
3rd
floor
of
Imperial
Centre
for
the
Arts
&
Sciences 










1,000,000
 10
Rocky
Mount NC CDBG Redevelopment
of
Home
Street
neighborhood 












500,000
 10
Rocky
Mount NC CDBG Complete
phase
I
construc3on
of
Douglas
Block
economic
redevelopment
project 










2,000,000
 20
Rocky
Mount NC CDBG Purchase
tax‐foreclosed
downtown
buildings
or
offer
grants/loans
to
owners
in
order
to
bring
buildings
up
to

current
codes
(10
buildings,
50,000
square
feet) 










1,500,000
 20
Rocky
Mount NC CDBG Redevelopment
of
Beal
Street
neighborhood 










1,500,000
 20
Rocky
Mount NC CDBG Stabiliza3on
of
historic
neighborhoods 










1,000,000
 20
Rocky
Mount NC CDBG Renovate
City‐owned
Booker
T.
Washington
High
School
for
economic
redevelopment
and
con3nued
use
by

local
nonprofit
for
job
training
and
peronal
development
programs 










8,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Rocky
Mount NC Energy Rebuild
or
replace
inefficient
chiller
system
at
Braswell
Memorial
Library
(City‐supported)
with
energy‐efficient

model,
replace
controls
(where
needed)
to
further
enhance
efficienty
and
conserva3on 












500,000
 2
Rocky
Mount NC Energy Replace
25‐year‐old,
inefficient
chillers
at
City
Hall
used
for
HVAC
with
energy‐efficient
models,
replace
HVAC

controls
to
further
enhance
efficiency
and
conserva3on 












600,000
 2
Rocky
Mount NC Energy Replace
inefficient
HVAC
system
at
City
Senior
System
with
energy‐efficient
model,
replace
controls
to
further

enhance
efficiency
and
conserva3on 












550,000
 2
Rocky
Mount NC Energy Retrofit
sprayground
facility
at
Sunset
Park
to
recycle
water,
reducing
water
consump3on 












250,000
 4
Rocky
Mount NC Energy Retrofit
25‐year‐old
City
Hall
with
energy‐efficient
fixtures
and
replacement
of
windows
(primary
contributor
to

energy
waste) 










1,000,000
 5
Rocky
Mount NC Housing Construc3on
of
senior
ci3zen
housing
as
part
of
planned
community
redevelopment
projects 












750,000
 2
Rocky
Mount NC Housing Supplement
exis3ng
City
support
for
nonprofit
housing
incen3ve
programs 












250,000
 15
Rocky
Mount NC Public
Safety Install
MDT
units
in
Fire
response
units 












300,000
 2
Rocky
Mount NC Public
Safety Replace
MDT
units
in
Police
patrol
cars 












250,000
 2
Rocky
Mount NC Public
Safety Upgrade
Enhanced
911
System
with
improved
capabili3es 












500,000
 2
Rocky
Mount NC Public
Safety Install
automated
vehicle
locator
(AVL)
system
in
public
safety
cars
and
other
cri3cal
response
units
to
facilitate

coordinated
dispatching
in
emergency
situa3ons 












800,000
 5
Rocky
Mount NC Public
Safety Hire
6
patrol
officers
through
COPS
Program
to
staff
Special
Enforcement
Team
(SET)
in
order
to
reduce

presence
of
targeted
criminal
ac3vity 












350,000
 6
Rocky
Mount NC Schools Restore
and
digi3ze
Killebrew
photography
collec3on
held
at
Braswell
Memorial
Library
(City‐supported

facility) 












500,000
 4
Rocky
Mount NC Schools Open
planned
local
history
museum
at
Imperial
Centre 












800,000
 5
Rocky
Mount NC Schools Expand
exis3ng
and
ins3tute
planned
new
educa3on
enrichment
programs
at
Braswell
Memorial
Library
(City‐
supported
facility) 












500,000
 10
Rocky
Mount NC Streets/Roads Reconstruc3on
of
roadways
at
railroad
crossings 












750,000
 8
Rocky
Mount NC Streets/Roads Planned
improvements
to
City's
stormwater
management
system
(4
projects) 










2,000,000
 15
Rocky
Mount NC Streets/Roads Accelerate
street
construc3on
and
reconstruc3on 










1,500,000
 20
Rocky
Mount NC Streets/Roads Accelerate
street
repaving
projects 










5,000,000
 20
Rocky
Mount NC Streets/Roads U3lity
realignment
for
Downtown
Streetscape
(current
SAFETEA
Project) 










2,000,000
 20
Rocky
Mount NC Streets/Roads Construc3on
of
Southern
Connector
highway 








10,000,000
 40
Rocky
Mount NC Transit Purchase
shufle
route
bus 














30,000
 1
Rocky
Mount NC Transit Purchase
transit
service
vehicle
for
road
calls
and
other
needs 














85,000
 1
Rocky
Mount NC Transit Build
replacement
transit
vehicle
wash
facility 












325,000
 2
Rocky
Mount NC Transit Construc3on
of
20
bus
shelters
at
exis3ng
bus
stops 












100,000
 2
Rocky
Mount NC Transit Purchase
exis3ng
facility
and
relocate
bus
driver
offices 












200,000
 2
Rocky
Mount NC Transit Build
facility
for
storage
of
transit
buses 












400,000
 4
Rocky
Mount NC Water Planned
upgrades
and
improvements
to
water
treatment
plants 












400,000
 2
Rocky
Mount NC Water Planned
upgrades
and
improvements
to
wastewater
treatment
plant 










1,500,000
 5
Rocky
Mount NC Water Planned
extension
of
City's
water
system
(4
projects) 










1,500,000
 10
Rocky
Mount NC Water Planned
extension
of
City's
wastewater
system
(5
projects) 










9,000,000
 60
Winston‐Salem NC CDBG New
C&D
landfill
construc3on 










4,000,000
 10
Winston‐Salem NC CDBG Public
infrastructure
to
support
film
and
theater
produc3on 










1,000,000
 20
Winston‐Salem NC CDBG Storm
water
floodplain
housing
buy‐out
and
open/park
space
crea3on 










2,400,000
 20
Winston‐Salem NC CDBG Playgrounds
parks
and
recrea3on
centers 










4,500,000
 25
Winston‐Salem NC CDBG Civic
Plaza
Park 










3,000,000
 30
Winston‐Salem NC CDBG Greenways
and
trails
(Parks
access) 










1,000,000
 30
Winston‐Salem NC CDBG Airport
Business
Park,

could
create
up
to
1200
jobs
at
build
ou 










5,000,000
 50
Winston‐Salem NC CDBG Sedge
Garden
Gymnasium 










5,000,000
 50
Winston‐Salem NC CDBG City
Yard
reloca3on
and
redevelopment 










8,000,000
 80
Winston‐Salem NC CDBG Storm
drainage
projects 










3,000,000
 80
Winston‐Salem NC CDBG Goler
(workforce/affordable
housing) 










8,000,000
 100
Winston‐Salem NC CDBG Revitalizing
Urban
areas

Redevelopment, 












500,000
 100
Winston‐Salem NC CDBG Swimming
pool
spray
park
conversions 












500,000
 100
Winston‐Salem NC CDBG New
industrial
park,
could
create
up
to
2500
new
jobs
at
build
out 










2,000,000
 200
Winston‐Salem NC CDBG PTRP:
road,
u3lity
and
other
infrastructure,
could
create
up
to
20,000
new
jobs
at
build
out 








26,200,000
 300
Winston‐Salem NC Energy Business
40
ligh3ng
replacement 










3,000,000
 20
Winston‐Salem NC Energy City
building
renova3ons
for
LEED 










2,000,000
 50
Winston‐Salem NC Energy Energy
Efficent
HVAC
upgrades
at
Coliseum,
Conven3on
Center
and
Bowman
Gray
Stadium 










3,000,000
 50
Winston‐Salem NC Energy Energy
efficient
ligh3ng
upgrades
at
and
around
City
facili3es 










4,000,000
 80
Winston‐Salem NC Energy City
Parking
Deck
Energy
Efficient
Ligh3ng
and
other
Upgrades 










6,000,000
 150
Winston‐Salem NC Energy Public
Safety
Center
LEED
based
renova3on 










9,500,000
 250
Winston‐Salem NC Housing Johnson
Square
Apartments
repair
and
renova3on 










3,600,000
 80
Winston‐Salem NC Public
Safety Crime
lab/forensics
equipment 












350,000
 0
Winston‐Salem NC Public
Safety Fire
Apparatus
replacement 










1,200,000
 0
Winston‐Salem NC Public
Safety Mobile
command
post
(for
police
and
fire) 












500,000
 0
Winston‐Salem NC Public
Safety Tasers
for
law
enforcement
officers 












500,000
 0
Winston‐Salem NC Public
Safety Youth
gang
preven3on
educa3on
materials 












250,000
 0
Winston‐Salem NC Public
Safety Addi3onal
patrol
officers
‐expansion
of
police
visibility
and
crime
preven3on
efforts 










1,200,000
 20
Winston‐Salem NC Public
Safety Fire
vehicle
maintenance
facility 












700,000
 20
Winston‐Salem NC Public
Safety Reentry
job
corp
for
grafiq
removal
and
city
parks
and
public
space
maintenance 












400,000
 20
Winston‐Salem NC Public
Safety addi3onal
school
resource
officers 










2,500,000
 25
Winston‐Salem NC Public
Safety Construc3on
of
fire
sta3on
19 










2,700,000
 25
Winston‐Salem NC Public
Safety Fire
Sta3on
21 










2,000,000
 25
City State Program Project
Descrip3on Funding
Required Jobs
Winston‐Salem NC Public
Safety Fire
Sta3on
22 










1,000,000
 25
Winston‐Salem NC Public
Safety Fire
Sta3on
8
reloca3on 










3,000,000
 25
Winston‐Salem NC Public
Safety Decentralized
district
substa3ons 










1,000,000
 30
Winston‐Salem NC Public
Safety Firing
range 








12,000,000
 30
Winston‐Salem NC Public
Safety Addi3onal
special
puropse
officers 










4,600,000
 46
Winston‐Salem NC Public
Safety Defensive
driving
vehicle
training
facility 










5,000,000
 50
Winston‐Salem NC Public
Safety Fire
Sta3on
renova3ons 










1,000,000
 50
Winston‐Salem NC Public
Safety Emergency
Opera3ons
Center 










6,000,000
 100
Winston‐Salem NC Public
Safety Law
Enforcement
Training
Facili3es‐comple3on
of
up
fit
to
training
building
and
construc3on
of
in‐door
city‐
county
firing
range 








40,000,000
 150
Winston‐Salem NC Streets/Roads Mar3n
Luther
King
Jr
Drive
traffic
calming
and
pedestrian
safety 












500,000
 10
Winston‐Salem NC Streets/Roads US
52
ramp
and
Vargrave
Street
Reconfigura3on 










8,000,000
 10
Winston‐Salem NC Streets/Roads Intersec3on
Traffic
Safety
Projects 












600,000
 20
Winston‐Salem NC Streets/Roads Old
Salem
Sidewalks
Repair,
Streetlight
Upgrades
and
Tree
Replacement
Project 












750,000
 20
Winston‐Salem NC Streets/Roads University
Parkway
widening 








11,000,000
 20
Winston‐Salem NC Streets/Roads Two
Way
of
3rd,
4th,
and
5th
Streets 












800,000
 30
Winston‐Salem NC Streets/Roads Bridge
Replacement
projects 










2,000,000
 50
Winston‐Salem NC Streets/Roads Clemmonsville
Road
extension 










5,000,000
 50
Winston‐Salem NC Streets/Roads Greenway
construc3on
(Transporta3on) 










1,000,000
 50
Winston‐Salem NC Streets/Roads Kernersville
Road
super‐street
at
Sedge
Garden
Road 










3,000,000
 50
Winston‐Salem NC Streets/Roads Traffic
signal
sytem
upgrades 










6,000,000
 50
Winston‐Salem NC Streets/Roads Resurfacing
of
streets 








14,000,000
 60
Winston‐Salem NC Streets/Roads Peters
Creek
Parkway
Interchange
Replacement
at
Business
40 








12,000,000
 70
Winston‐Salem NC Streets/Roads Peace
Haven
and
US
421
interchange
improvements 








15,000,000
 75
Winston‐Salem NC Streets/Roads Salem
Creek
connector
and
Research
Parkway 








16,000,000
 80
Winston‐Salem NC Streets/Roads Sidewalk
construc3on 










6,000,000
 80
Winston‐Salem NC Streets/Roads Brookstown
Phase
II,
$7,000,000
could
create
up
to
500
jobs
at
build
out 










5,000,000
 100
Winston‐Salem NC Streets/Roads Roadway
projects
supplemented
by
local
bonds 








12,000,000
 120
Winston‐Salem NC Streets/Roads Union
Cross
Road
widening 








60,000,000
 160
Winston‐Salem NC Transit Fixed
Route
and
Paratransit
Buses 










7,100,000
 20
Winston‐Salem NC Transit Streetcar 








14,000,000
 80
Winston‐Salem NC Transit Union
Sta3on/Davis
Garage,
could
create
up
to
250
jobs
at
build
out 










5,000,000
 100
Winston‐Salem NC Water Water
and
Sewer
GIS/Work
Order
Management
System 










2,700,000
 10
Winston‐Salem NC Water Yadkin
River
Land
Protec3on
Buffer
Purchase 










1,000,000
 10
Winston‐Salem NC Water Muddy
Creek
Find
and
Fix
Project 










3,000,000
 15
Winston‐Salem NC Water Neighborhood
water/sewer
rehabilita3on 










6,000,000
 20
Winston‐Salem NC Water New
Elevated
Water
Tanks 










6,800,000
 20
Winston‐Salem NC Water Reentry
job
corp
for
water
suply
creek
cleanups 












400,000
 20
Winston‐Salem NC Water Water
Tank
Rehabilita3on 










3,700,000
 20
Winston‐Salem NC Water Construc3on
and
Maintenance
Facili3es
Improvements 










3,500,000
 25
Winston‐Salem NC Water Winston‐Salem
State
University
Campus
Distribu3on
System
Improvements 










4,600,000
 25
Winston‐Salem NC Water Replcement
of
2"
water
mains 










4,000,000
 50
Winston‐Salem NC Water Wastewater
Collec3on
Improvements 










2,000,000
 50
Winston‐Salem NC Water Drainage
Improvements
on
Private
Property 










5,500,000
 80
Winston‐Salem NC Water Neilson
Water
Treatment
Plant 








15,000,000
 100
Winston‐Salem NC Water Rebuld
of
Thomas
Water
Treatment
Plant 








25,000,000
 125
Winston‐Salem NC Water Water
Supply
reservoir
dam
rehabilita3on 








25,000,000
 125
Winston‐Salem NC Water Elledge
Waste
Water
Plant
system
rehabilita3on
and
land
buffer
enhancements 








51,000,000
 150
Winston‐Salem NC Water PTRP
stormwater
project 








12,000,000
 150
Winston‐Salem NC Water Chify
High
Service
Pumping
Sta3on
‐
Standby
Power 








51,000,000
 160
Grand
Forks ND Airport Airport
Terminal
construc3on
‐
remaining
$4M
of
the
$20M
project
not
allocated
through
AIP. 










4,000,000
 80
Grand
Forks ND CDBG Land
for
new
construc3on
of
affordable
housing
development 










2,400,000
 0
Grand
Forks ND CDBG Community
Bricks
and
Mortar
projects
currently
unfunded
through
regular
CDBG
alloca3ons 












750,000
 15
Grand
Forks ND CDBG Acquire/rehab/convert
exis3ng
building
as
part
of
the
city/state
homeless
plan 












850,000
 17
Grand
Forks ND CDBG Infrastructure
projects
and
acquisi3on/demoli3on
in
targeted
neighborhood 










1,000,000
 20
Grand
Forks ND CDBG Extend
Promenade
housing
development
(50
units)
with
the
increase
of
30
rental
lots 










4,000,000
 40
Grand
Forks ND CDBG Extend
Promenade
housing
development
(50
units)
with
the
increase
of
41
for‐sale
lots 










5,700,000
 60
Grand
Forks ND Energy Bio‐Diesel
or
Mul3‐fuel
Fire
Truck 












500,000
 0
Grand
Forks ND Energy Convert
25%
of
exis3ng
city
passenger
vehicle
fleet
to
bio‐deisel
and/or
hybrid 












500,000
 0
Grand
Forks ND Energy Convert
ligh3ng
in
Public
Library
to
energy
efficient
CFL's 














25,000
 1
Grand
Forks ND Energy Demonstra3on
project
for
Community
Rain
Gardens 














10,000
 1
Grand
Forks ND Energy Demonstra3on
project
for
installa3on
of
Wind
Turbine(s)
at
City
Facility 












100,000
 2
Grand
Forks ND Energy Energy
Alliance
‐
Weatheriza3on
Coordina3on
project
to
increase
energy
efficiency
for
all
income
households
‐

Demonstra3on
Project 












100,000
 2
Grand
Forks ND Energy Upgrade
ligh3ng
for
all
exis3ng
Fire
Sta3ons 












134,000
 2
Grand
Forks ND Energy Energy
Efficiency
upgrades
for
Alerus
Center 










1,200,000
 12
Grand
Forks ND Energy Energy
update
and
retrofit
of
Central
Fire
Sta3on
including

installa3on
of
Wind
and
Photovoltaic
energy

sources 












630,000
 12
Grand
Forks ND Energy Citywide
traffic
signal
upgrades
with
new
technology
and
electronics 










2,000,000
 20
Grand
Forks ND Energy Installa3on
of
Large‐Wind
genera3on
project
to
provide
energy
for
Public
Safety
Training
Facility
and
for

redistribu3on 










1,125,000
 22
City State Program Project
Descrip3on Funding
Required Jobs
Grand
Forks ND Energy Energy
Efficiency
upgrades
for
exis3ng
municipal
buildings 










5,500,000
 30
Grand
Forks ND Energy Capture
Methane
gas
at
exis3ng
landfill
site
and
convert
to
energy
for
use
and
distribu3on 










4,000,000
 40
Grand
Forks ND Public
Safety Acquire
land
for
future
Fire
Sta3on
as
listed
in
capital
improvement
plan 












243,000

Grand
Forks ND Public
Safety Install
new
and
updated
security
systems
at
Fire
Department
Facili3es 












100,000
 2
Grand
Forks ND Public
Safety Provide
Coverage
for
Airport
Security
by
Grand
Forks
Police
Department
Uniform
Patrol
Bureau 












110,000
 2
Grand
Forks ND Public
Safety Upgrade
current
single
transmit
public
safety
radio
system
to
simulcast,
add
addi3onal
receiver
sites,
and
add

in‐building
signal
amplifica3on
to
cri3cal
public
facili3es. 












800,000
 16
Grand
Forks ND Public
Safety Upgrade
and
relocate
current
9‐1‐1
Center 










2,600,000
 52
Grand
Forks ND Streets/Roads 20th
St.
N.
seal
coat
from
Gateway
Dr.
to
University
Ave. 














60,000
 2
Grand
Forks ND Streets/Roads Mill
Road
seal
coat
from
Gateway
Dr.
to
Washington
St. 












100,000
 2
Grand
Forks ND Streets/Roads Intersec3on
upgrade
at
11th
Ave.
S.
and
42nd
St.
S. 












290,000
 6
Grand
Forks ND Streets/Roads University
Ave.
seal
coat
from
3rd
St.
N.
to
State
St. 












280,000
 6
Grand
Forks ND Streets/Roads 32nd
Ave.
S.
concrete
panel
replacement
from
Belmont
Rd.
to
S.
Washington 












325,000
 7
Grand
Forks ND Streets/Roads 51st
St.
N.
concrete
panel
replacement
from
10th
Ave.
N.
to
University
Ave. 












375,000
 8
Grand
Forks ND Streets/Roads Construc3on
of
20th
Ave.
S.
from
25th
St.
to
Columbia
Rd. 












460,000
 9
Grand
Forks ND Streets/Roads Roundabout
at
34th
St.
and
24th
Ave.
S. 












450,000
 9
Grand
Forks ND Streets/Roads 17th
Ave.
S.
concrete
panel
replacement
from
Washington
St.
to
Columbia
Rd. 












500,000
 10
Grand
Forks ND Streets/Roads 47th
Ave.
S.
reconstruc3on
from
S.
Washington
to
S.
Columbia
Rd. 












500,000
 10
Grand
Forks ND Streets/Roads Intersec3on
improvements
at
47th
Ave.
S.
and
Washington
St. 












500,000
 10
Grand
Forks ND Streets/Roads Stanford
Rd.
concrete
panel
replacement
from
6th
Ave.
N.
to
University
Ave. 












500,000
 10
Grand
Forks ND Streets/Roads 8th
Ave.
N.
concrete
panel
replacement
from
3rd
St.
N.
to
Columbia
Rd. 












560,000
 11
Grand
Forks ND Streets/Roads 42nd
St.
N.
concrete
panel
replacement
from
27th
Ave.
N.
to
DeMers
Ave. 












620,000
 12
Grand
Forks ND Streets/Roads 40th
Ave.
S.
concrete
panel
replacement
from
Belmont
Rd.
to
Clearview
Dr. 












650,000
 13
Grand
Forks ND Streets/Roads Classified
street
sign
replacement
at
controlled
intersec3ons 












680,000
 13
Grand
Forks ND Streets/Roads 13th
Ave.
S.
concrete
panel
replacement
from
Cherry
St.
to
Columbia
Rd. 












900,000
 18
Grand
Forks ND Streets/Roads 20th
St.
S.
concrete
panel
replacement
from
24th
Ave.
S.
to
DeMers
Ave. 












900,000
 18
Grand
Forks ND Streets/Roads Cherry
St.
reconstruc3on
from
25th
Ave.
S.
to
47th
Ave.
S. 










1,050,000
 21
Grand
Forks ND Streets/Roads Concrete
repair,
dowel
bar
retrofit,
grinding,
etc.,
at
DeMers
Ave.
from
5th
St.
to
Washington
St. 










1,365,000
 27
Grand
Forks ND Streets/Roads 15th
Ave.
S.
Reconstruc3on
from
49th
St.
to
52nd
St.
then
North
along
52nd
St.
to
12th
Ave.
S. 










1,500,000
 30
Grand
Forks ND Streets/Roads Construc3on
of
34th
St.
from
Ruemmele
Rd.
to
40th
Ave.
S.,
including
40th
Ave.
S.
from
Ruemmele
Rd.
to
38th

Ave.
S. 










1,500,000
 30
Grand
Forks ND Streets/Roads Downtown
Traffic
Signal
upgrades 










1,700,000
 34
Grand
Forks ND Streets/Roads Columbia
and
Gatewaay
intersec3on
improvement 










1,825,000
 37
Grand
Forks ND Streets/Roads Cherry
St.
reconstruc3on
from
17th
Ave.
S.
to
25th
Ave.
S. 










1,950,000
 39
Grand
Forks ND Streets/Roads Columbia
Rd.
reconstruc3on
from
Overpass
to
11th
Ave.
S. 










2,400,000
 48
Grand
Forks ND Streets/Roads Reconstruc3on
of
48th
St.
from
DeMers
Ave.
to
17th
Ave.
S. 










3,000,000
 60
Grand
Forks ND Streets/Roads Box
culvert
along
48th
St.
from
17th
Ave.
S.
to
32nd
Ave.
S. 










5,000,000
 100
Grand
Forks ND Streets/Roads S.
48th
St.
from
17th
Ave.
S.
to
32nd
Ave.
S. 










7,900,000
 158
Grand
Forks ND Transit Bus
Garage
Reconstruc3on
and
Repair 












500,000
 10
Grand
Forks ND Water 34th
St.
Storm
sewer
from
Ruemmele
Rd.
to
the
S.
End
Drainway 










1,000,000
 10
Grand
Forks ND Water Storm
Water
treatment
pond
on
new
southend
development 










1,000,000
 10
Grand
Forks ND Water Relief
Storm
Sewer
from
Columbia
Rd.
to
English
Coulee
along
11th
Ave.
N. 










1,500,000
 15
Grand
Forks ND Water Water
Treatment
plant
rehabilita3on 










2,000,000
 20
Grand
Forks ND Water 48th
St.
Lib
Sta3on
on
32nd
Ave.
S.
and
48th
St. 










3,000,000
 30
Grand
Forks ND Water New
Landfill
development
and
associated
infrastructure
requirements 








10,000,000
 100
Lincoln NE CDBG Stronger,
Safer,
Neighborhoods
Ini3a3ve:
Improvements
to
blighted
neighborhoods
with
installa3on
of

streetlights,
street
trees,
and
gravel
alleys 










1,096,100
 1.5
Lincoln NE CDBG 4th
Street
lights
and
street
trees
in
a
low
income
neighborhood 












300,000
 2
Lincoln NE CDBG North
Bofoms
Streetscape:
Project
iden3fed
in
the
Antelope
Valley
Redevelopment
Plan 












350,000
 2
Lincoln NE CDBG Maf
Talbot
Kitchen:
Soup
kitchen
and
outreach
facili3es 










1,750,000
 3
Lincoln NE CDBG Transi3onal
housing
for
homeless 










3,000,000
 5
Lincoln NE CDBG Parks:
27
projects
in
20
parks,
ADA
accessibility,
playground
equipment,
sidewalks,
and
ligh3ng 










1,500,000
 8
Lincoln NE CDBG Sidewalks:
5
neighborhoods,
could
be
and
ready
to
construct
in
3‐6
months 










2,000,000
 8
Lincoln NE CDBG 5
neighborhoods
surveyed
and
ready
to
construct 










2,380,000
 17
Lincoln NE CDBG Street
Paving:
approx.
118
blocks 








12,390,000
 60
Lincoln NE Energy Work
with
LES
to
provide
residen3al
and
commercial
energy
audit
program 












150,000

Lincoln NE Energy Technical
consultant
services
to
design
an
ac3ve
landfull
gas
recovery
system 












600,000
 0
Lincoln NE Energy Technical
consultant
services
to
develop
a
sustainability
plan
for
City 












250,000
 0
Lincoln NE Energy Technical
consultant
services
to
review
City
building
codes
and
promote
sustainability
and
building
energy

efficiency 












150,000
 0
Lincoln NE Energy Solar
powered
fountain
pumps
at
4
loca3ons 














15,000
 0.2
Lincoln NE Energy Solar
cell
area
ligh3ng
parks
with
single
security
lights 














75,000
 0.9
Lincoln NE Energy Solar
panels/PVC
for
alternate
energy
supply
at
park
nature
center 














50,000
 0.9
Lincoln NE Energy Sprayground
effluent
reservoir
reuse
for
park
irriga3on 














50,000
 0.9
Lincoln NE Energy Wind
Turbine
Alterna3ve
Energy
Supply
for
Park
Nature
Center 














65,000
 1.2
Lincoln NE Energy Solar
panels/PVC
for
alternate
energy
supply
at
LPR
Admin.
building 














90,000
 1.6
Lincoln NE Energy Solar
area
ligh3ng
for
park 












120,000
 2.2
Lincoln NE Energy Geothermal
conversion
for
HVAC
sytems
at
LPR
Admin.
building 












250,000
 4.5
Lincoln NE Energy Solar
water
hea3ng
at
10
pool
facili3es 












250,000
 4.5
Lincoln NE Energy Geothermal
Conversion
for
HVAC
systems
at
easterday
recrea3on
center 












500,000
 9
City State Program Project
Descrip3on Funding
Required Jobs
Lincoln NE Energy Development
of
grant
fund
for
NGO's
to
assist
with
implemen3ng
the
energy
efficiency
and
conserva3on

strategy
in
the
Sustainability
Plan 












640,000
 17.5
Lincoln NE Energy Development
of
a
low
interest
revolving
loan
fund
for
energy
efficiency
and
conserva3on 












640,000
 37.5
Lincoln NE Energy LEED
pla3num
cer3fied
building
construc3on
Golf
Clubhouse
replacement 










3,000,000
 54.1
Lincoln NE Housing Replace
roofs
at
Hansen
units 












150,000
 10
Lincoln NE Housing Replace
tub/showers
at
P‐30
units 












150,000
 20
Lincoln NE Housing Install
aqc
insula3on
at
F‐39
units 














46,800
 40
Lincoln NE Housing Install
fire
sprinklers
at
Mahoney
Manor,
a
senior
high‐rise
building 












400,000
 125
Lincoln NE Housing Remodal
community
room
and
kitchen
at
Mahoney
Manor 














50,000
 150
Lincoln NE Public
Safety Ballis3c
improvement
project 












125,000
 0
Lincoln NE Public
Safety Crime
scene
inves3ga3on
mobile
unit 












120,000
 0
Lincoln NE Public
Safety Digital
recording
and
transcrip3on 












165,000
 0
Lincoln NE Public
Safety Forensic
lab
improvement
project 












150,000
 0
Lincoln NE Public
Safety GPS
locators
for
patrol
cars 














71,000
 0
Lincoln NE Public
Safety Informa3on/intelligence
display
upgrade 














46,500
 0
Lincoln NE Public
Safety Mobile
command
post 












216,000
 0
Lincoln NE Public
Safety Patrol
car
video
systems 












852,000
 0
Lincoln NE Public
Safety Public
place
CCTV
enhancement 














80,000
 0
Lincoln NE Public
Safety Staffing
of
Police
Officers 












486,000
 9
Lincoln NE Streets/Roads Traffic
Monitoring
Camera
Program:
Install
10
key
intersec3ons
to
improve
traffic
flow 












100,000
 1
Lincoln NE Streets/Roads Digital
Message
Sign
Program:
Install
16
intersec3ons
to
improve
traffice
communica3on
and
incident

management,Funding
Required 










1,000,000
 7
Lincoln NE Streets/Roads Traffic
Communica3on:
Install
fiber
and
conduit
for
10
projects
to
improve
traffice
flow
and
communica3on 










1,100,000
 8
Lincoln NE Streets/Roads Traffic
Signal
Replacements:
replacement
of
20
intersec3ons
of
obsolete
equipment 










2,800,000
 20
Lincoln NE Streets/Roads Arterial
Street
Rehabilita3onsImprovement
of
over
175
blocks
of
main
city
streets 








19,400,000
 136
Lincoln NE Transit Replace
9
current
HandiVan
hybrid
vehicles 










1,000,000

Lincoln NE Transit Replace
current
HandiVan
diesel
vehicles 












584,000

Lincoln NE Transit Rehabilita3on
of
downtown
bus
shelter 












215,000
 10
Lincoln NE Water Water
produc3on
system
construc3on
and
installa3on 










2,000,000
 14
Lincoln NE Water Water
mains
construc3on 










6,100,000
 43
Lincoln NE Water Wastewater
treatment 










7,800,000
 44
Omaha NE CDBG Purchase
New
Pumper
Firetrucks 










1,146,000
 10
Omaha NE CDBG Pedestrian/Street
Ligh3ng
and
Tree
Plan3ng
in
Central
Development
District 












250,000
 15
Omaha NE CDBG Vinton
Street
Streetscape
project 












100,000
 20
Omaha NE CDBG Park
Avenue
Streetscape
project 












750,000
 25
Omaha NE CDBG 42nd
&
Lake
Eagle
Nest
Infill
Houses 










2,300,000
 30
Omaha NE CDBG North
24th
Street
Corridor
Improvements 










1,500,000
 30
Omaha NE CDBG South
24th
Business
Corridor
Improvement
project 










1,500,000
 30
Omaha NE CDBG 16th
&
Yates
Infill
Townhouses 










4,100,000
 40
Omaha NE CDBG Compressed
natural
gas
fueling
facility
and
vehicles 










1,000,000
 40
Omaha NE CDBG North
Omaha
Human
Services
Campus
Empowerment
Center 










3,700,000
 40
Omaha NE CDBG Scafered
Site
Affordable
Infill
Houseing 










3,700,000
 40
Omaha NE CDBG Asbestos
abatement
and
systems
structural/systems
renova3on
of
Central
Police
Headquarters.
This
building

houses
police
administra3on,
all
detec3ve
and
support
opera3ons.
The
1970
building
is
in
cri3cal
need
of

abatement
in
order
to
allow
con3nued
o 








29,950,000
 45
Omaha NE CDBG Wintergreen/Myof
Park
Redevelopment
project 










4,760,000
 100
Omaha NE Energy Purchase
180
flex
fuel‐E85
Ford
Crown
Victoria
Police
Interceptor,
15
GMC
or
equivalent
vehicles
and
convert

three
city
fueling
sites
for
E‐85. 










5,950,000
 50
Omaha NE Housing Replace
Intercom
Systems
in
11
Tower
Buildings
serving
1406
Public
Housing
Units 












350,000
 5
Omaha NE Housing Replace
roofing
at
2
Public
Housing
/
LIHTC
proper3es
containing
47
units
at

1234
South
13th
Street
and
305

South
16th
Street
‐
Commercial
Grade
EPDM
membrane
roofing
 












160,000
 6
Omaha NE Housing Replace
parking
lot
at
Kay
Jay
Tower
‐
Elderly
&
Disabled
Public
Housing
‐
117
units 












250,000
 7
Omaha NE Housing Public
Housing
Scafered
Sites
Sec3on
504
Improvements
to
45
units
to
meet
requirements
of
Voluntary

Compliance
Agreement
‐
Uniform
Federal
Accessibility
Strandards 












900,000
 9
Omaha NE Housing Renova3ons
to
56
units
of
Project
Based
Sec3on
8
in
8
buildings
on
scafered
sites 










4,291,488
 40
Omaha NE Housing Renova3ons
to
crown
Tower
‐
149
uints
of
elderly
disabled
housing
in
a
12
story
tower
building
‐
repalce
all

windows,
brick
veneer,
install
new
unit
fan
coil
systems,
structural
shear
walls
to
all
exterior
walls,
repalce

roofing
and
make
up
air
system. 










5,500,000
 50
Omaha NE Housing Fire
Sprinkler
System
Installa3on
and
Fire
&
Life
Safety
Upgrades
to
meet
current
code
requirements
at
7
OHA

Tower
Buildings.
 










8,000,000
 80
Omaha NE Housing Public
Housing
Scafered
Sites
General
Renova3ons
at
258
single
family
units
and114
duplex
units
to
include

replacement
of
roofing,
siding,
guferes
&
downspouts,
grading,
concrete
sidewalks
&
driveways
&
retaining

walls 








24,062,795
 140
Omaha NE Public
Safety Development
of
an
electronic
records
management
system
to
replace
the
current
paper/physical
system.

This

proposal
would
allow
the
police
department
to
upgrade
fuc3onality
and
use
befer
analysis
to
more
effec3vely

address
crime
preven3on,
crime
serie 










1,875,000
 12
Omaha NE Public
Safety Outdoor
Firearm
Range.
Need
to
close
a
small
range
in
a
suburban
area.
An
outside
range
is
necessary
for

approved
training.
Range
would
include
25
&
150
meter
components,
range
tower,
classroom
and
access
road.

Will
serve
mul3‐agency,
two
state
area.
It
 










2,987,000
 18
Omaha NE Streets/Roads Improvements
to
Bridges
at
13th
Street
and
7th
Street 












115,000
 15
Omaha NE Streets/Roads Addi3on
to
the
Traffic
Shop 












350,000
 20
Omaha NE Streets/Roads Elkhorn
Salt
Storage
Shed 












825,000
 20
Omaha NE Streets/Roads Garage
for
Street
Sweepers 












500,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Omaha NE Streets/Roads North
Freeway
and
Sorensen
Parkway
project 












600,000
 20
Omaha NE Streets/Roads Safe
Routes
to
School
at
144th
&
Fort 












500,000
 20
Omaha NE Streets/Roads Brine
Manufacturering
Facility 










1,500,000
 25
Omaha NE Streets/Roads Street
Maintenance
Equipment
Storage
Facilty 










1,500,000
 25
Omaha NE Streets/Roads 108th
Street
–
“L”
to
“Q”
Street
project 










1,500,000
 30
Omaha NE Streets/Roads 132nd
Street
–
Blondo
Street
to
West
Maple
Road
reconstruc3on
project 










5,540,000
 30
Omaha NE Streets/Roads 156th
and
West
Center
Road
intersec3on
project 










7,500,000
 30
Omaha NE Streets/Roads 156th
Street
‐
West
Dodge
Rd.
to
Pacific
Street
reconstruc3on
project 










4,500,000
 30
Omaha NE Streets/Roads 90th
Street
‐
F
Street
to
L
Street
reconstruc3on
project 










2,000,000
 30
Omaha NE Streets/Roads Farnam
Street
Rehabilita3on
‐
36th
Street
to
42nd
Street 










2,000,000
 30
Omaha NE Streets/Roads Rebuild
“F”
Street
from
146th
Street
to
155th
Street 










2,500,000
 30
Omaha NE Streets/Roads 150th
and
West
Center
Road
bridge
project 








12,000,000
 40
Omaha NE Streets/Roads 16th
&
Jaynes
Street
Maintenance
Facility 










6,000,000
 40
Omaha NE Streets/Roads Bridge
Rehabilita3on
at
Various
Loca3ons 










1,000,000
 40
Omaha NE Streets/Roads New
Vehicle
Maintenance
Facility 








10,000,000
 40
Omaha NE Streets/Roads Major
and
Residen3al
Street
Rehabilita3on
and
Resurfacing 








11,600,000
 60
Omaha NE Streets/Roads Rebuild
Traffic
Signals 










2,000,000
 60
Omaha NE Streets/Roads ADA
Street
Ramp
Installa3on
Project 










5,000,000
 80
Omaha NE Streets/Roads Miscellaneous
Infrastructure
Rehabilita3on
Projects 










1,000,000
 80
Omaha NE Streets/Roads Safety
and
Capacity
Improvements
at
Various
Loca3ons 










4,250,000
 100
Omaha NE Transit Replace
obsolete
maintenance
equipment. 












200,000
 1
Omaha NE Transit Replace
26‐year‐old
Administra3ve/Maintenance
Facility's
original
garage
doors. 












283,120
 2
Omaha NE Transit Expand
video
surveillance
system
to
include
live
video
feed,
911
interface
and
ADA
compliant
annunciator

system. 












774,360
 4
Omaha NE Transit Upgrade
Administra3ve/Maintenance
facility
phone
and
computer
systems. 












899,360
 4
Omaha NE Transit Replace
9‐year‐old
refurbished
bus
washers
and
26‐year‐old
original
bus
vacuum
system. 










2,315,600
 5
Omaha NE Transit Upgrade
security
systems
at
26‐year‐old
Administra3ve/Maintenance
Facility. 










1,232,480
 5
Omaha NE Transit Rebuild
HVAC
and
air
systems
on
37
low‐floor
buses
to
reduce
maintenance
costs
and
improve
reliability. 












506,900
 6
Omaha NE Transit Rebuild
37
low‐floor
bus
body's
deteriora3ng
infrastructure
and
associated
components
to
reduce

mainetenance
costs
and
increase
safety. 










2,071,200
 10
Omaha NE Transit Replace
26‐year‐old
Administra3ve/Maintenance
Facility's
interior
and
exterior
ligh3ng
fixtures
with
energy

efficient
fixtures
and
systems. 










2,399,360
 10
Omaha NE Transit Replace
16
paratransit
fleet
vehicles
that
have
exceeded
FTA's
Rolling
Stock
Useful
Life
Policy. 










1,200,000
 16
Omaha NE Transit Upgrade
26‐year‐old
Administra3ve/Maintenance
Facility's
original
HVAC
and
air
handling
systems
for
energy

efficiency.
 










3,165,600
 20
Omaha NE Transit Increase/expand
transit
service.
 










3,517,846
 21
Omaha NE Transit Rebuild
37
low‐floor
bus
engines,
transmissions
and
sub‐systems
to
reduce
maintenance
costs
and
increase

safety. 










3,418,800
 25
Omaha NE Transit Renovate
26‐year‐old
Administra3ve/Maintenance
Facility's
interior/exterior
structure. 










3,899,210
 30
Omaha NE Transit Replace
47
transit
vehicles
that
have
exceeded
FTA's
Rolling
Stock
Useful
Life
Policy. 








16,294,000
 47
Omaha NE Water Papillion
Creek
Computer
System
Backup
Generator 












100,000
 10
Omaha NE Water Papillion
Creek
Engine
Generator
Wiring
Replacement 












150,000
 10
Omaha NE Water Sanitary
Manhole
Rehabilita3on
Project 










1,000,000
 12
Omaha NE Water Papillion
Creek
Secondary
Treatment
Rehabilita3on 












600,000
 15
Omaha NE Water Stormwater
Inlet
Rehabilita3on
Project 










2,000,000
 15
Omaha NE Water 1st
&
Leavenworth
Street
Lib
Sta3on
Improvements 










1,200,000
 20
Omaha NE Water 24th
&
Ogden
Street
Combined
Sewer
Separa3on 










2,000,000
 20
Omaha NE Water 42nd
&
X
Street
Combined
Sewer
Separa3on 










1,400,000
 20
Omaha NE Water 72nd
&
Girard
Sanitary
Lib
sta3on
Decommission
Project 












300,000
 20
Omaha NE Water 76th
&
F
Stormwater
Project 












615,000
 20
Omaha NE Water 84th
&
F
Sanitary
Sewer
Rehabilita3on 












300,000
 20
Omaha NE Water 96th
Street
Sanitary
Sewer
Capacity
upgrade 










3,000,000
 20
Omaha NE Water Missouri
river
Digester
Piping
Modifica3ons 












200,000
 20
Omaha NE Water Missouri
River
Floodwall
Closure
Project 












250,000
 20
Omaha NE Water Missouri
River
Levee
Culvert
Rehabilita3on
Project 












300,000
 20
Omaha NE Water Missouri
River
Sludge
Belt
Press
Replacement
Project 










1,500,000
 20
Omaha NE Water Missouri
River
Solids
Dewatering
Facility
HVAC
Improvements 












400,000
 20
Omaha NE Water Missouri
River
Solids
Dewatering
Facility
MCC
Project 










1,400,000
 20
Omaha NE Water Monroe
Street
Check
Valve
Replacement
Project 












300,000
 20
Omaha NE Water Ohern
Street
Grit
Facility
Odor
Control
and
Improvements 












600,000
 20
Omaha NE Water Papillion
Creek
Sludge
Belt
Press
Replacement
Project 










1,000,000
 20
Omaha NE Water Papillion
Creek
WWTP
Influent
Screen
Rehabilita3on 












800,000
 20
Omaha NE Water Cole
Creek
Channel
Improvements 










2,000,000
 25
Omaha NE Water Papillion
Creek
Primary
Clarifier
Rehabilita3on
Project 










2,000,000
 25
Omaha NE Water Aksarben
Village
Sewer
Separa3on 










3,000,000
 30
Omaha NE Water Papillion
Creek
Medium
Voltage
Upgrade
Project 










2,000,000
 30
Omaha NE Water Storm
Channel
Rehabilita3on
Projects 












800,000
 30
Omaha NE Water Papillion
Creek
Interceptor
Crossing
Repairs 










1,200,000
 35
Omaha NE Water Monroe
Basin
Sewer
Separa3on 










6,000,000
 40
Omaha NE Water Papillion
Creek
WWTP
digester
cover
replacement 










5,000,000
 40
Omaha NE Water Webster
Street
combined
sewer
separa3on 










8,000,000
 50
Omaha NE Water Missouri
River
Flood
Levee
Rehabilita3on
Project 










2,100,000
 65
Omaha
 NE CDBG Cunningham
Lake
Trail
Installa3on 










2,200,000
 30
Omaha
 NE CDBG City
Wide
Trail
and
Stream
Bank
Restora3on 










4,500,000
 50
Omaha
 NE Streets/Roads Walnut
Grove
Park
Road
and
Renova3on 












735,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Omaha
 NE Streets/Roads Cunningham
Lake
Road
and
Parking
Renova3on 










1,700,000
 30
Omaha
 NE Streets/Roads Standing
Bear
Lake
Road
and
Parking
Renova3on 










1,600,000
 30
Omaha
 NE Streets/Roads Levi
Carter
Park
Road
and
Parking
Renova3on 










2,100,000
 35
Omaha
 NE Water Carter
Lake
Watershed
Best
Management
Prac3ces 










3,700,000
 30
Clibon NJ Streets/Roads Fairmount
Avenue,
Fernwood
Court,
Marilyn
Place,
Concord
Street,
and
Thomas
Street
roadway
and
drainage

improvements. 










1,300,000

Clibon NJ Streets/Roads Improvements
to
various
streets
City‐wide. 










3,585,000

Clibon NJ Streets/Roads Urma
Avenue
area
roadway
and
drainage
improvements 










2,700,000

Clibon NJ Water Mar3n
Avenue
Sanitary
Sewer
Pump
Sta3on
replacement 












500,000

East
Orange NJ CDBG Upgrade
Water
Pump
System 












980,000
 47
East
Orange NJ CDBG Street
Reconstruc3on 










1,300,000
 85
East
Orange NJ CDBG DPW
Garage 










1,750,000
 105
East
Orange NJ CDBG Senior
Center 










1,200,000
 123
East
Orange NJ CDBG Civic/Recrea3on
Center 










2,300,000
 135
East
Orange NJ CDBG Rehab.
Old
Police
Facility 










6,000,000
 155
East
Orange NJ Energy Upgrade
Hea3ng/Cooling
System 










6,000,000
 60
East
Orange NJ Energy Energy
Retrofits
7
Public
Bldgs 








11,000,000
 160
East
Orange NJ Public
Safety Combine
Fire/Police
Dispatch 












900,000
 12
East
Orange NJ Public
Safety New
Public
Safety
Equipment 










2,250,000
 15
East
Orange NJ Public
Safety New
Technologies 










2,100,000
 20
East
Orange NJ Public
Safety Addi3onal
Police 










4,500,000
 25
East
Orange NJ Streets/Roads Street
Total
Reconstruc3on
10
Streets 










4,700,000
 130
East
Orange NJ Water Upgrade
Storm
Sewers 










4,800,000
 70
East
Orange NJ Water Upgrade
Sanitary
Sewers 










5,700,000
 80
East
Orange NJ Water Upgrade
Water
Infrastructure 










6,000,000
 100
edison
 NJ CDBG affordable
housing
business
loans,
infrastructure
loans,
support
o
non
profits 










5,000,000
 25
edison
 NJ Energy replace
old
inefficient
motor
fleet
with
hybrid
vehicles

 










5,000,000
 20
edison
 NJ Energy solar,
wind
and
energy
conserva3on
projects
throughtout
municipal
buildings
and
facili3es
 










6,000,000
 20
edison
 NJ Housing new
health
center
to
replace
current
one 










5,000,000
 10
edison
 NJ Housing funding
to
support
affordable
housing
need
in
twp 










8,000,000
 20
edison
 NJ Housing new
senior/community
center 










8,000,000
 25
edison
 NJ Public
Safety new
fire
houses,
fire
trucks
and
police
cars

 










5,000,000
 10
edison
 NJ Schools improvements
to
historic
thomas
a.
ediosn
museum
and
tower 








10,000,000
 50
edison
 NJ Schools new
and
rehab
schools
in
twp
 








57,000,000
 125
edison
 NJ Streets/Roads road
and
bridge
safety
improvements
 








20,000,000
 50
edison
 NJ Transit new
hybrid
bus
fleet
for
municipal
bus
service
 










1,000,000
 10
edison
 NJ Water sewer
and
water
projects
throughout
town 








10,000,000
 25
Elizabeth NJ CDBG Library
Historic
Renova3on
‐
Interior 












500,000
 10
Elizabeth NJ CDBG New
Outdoor
Two
Inground
Swimming
Pools 










4,000,000
 10
Elizabeth NJ CDBG Public
Marina
Floa3ng
Docks 












500,000
 10
Elizabeth NJ CDBG Roof
Repairs
‐
Erxleben
Center 












500,000
 10
Elizabeth NJ CDBG Roof
Repairs
‐
Mickey
Walker
Recrea3on
Center 












500,000
 10
Elizabeth NJ CDBG Roof
Repairs
‐
Miller
Recrea3on
Center 












500,000
 10
Elizabeth NJ CDBG Roof
Repairs
‐
City
Hall 










1,000,000
 20
Elizabeth NJ CDBG Roof
Repairs
‐
Police
HQ 










1,000,000
 20
Elizabeth NJ CDBG Roof
Repairs
‐
Public
Library
‐
Broad
Street 










1,000,000
 20
Elizabeth NJ CDBG Way‐Finding
Signage
Project 










1,000,000
 20
Elizabeth NJ CDBG Elizabethport
Community
Health
Center 










2,500,000
 50
Elizabeth NJ CDBG Broad
Street
Streetscape
Improvements 










3,000,000
 60
Elizabeth NJ CDBG Elizabeth
Avenue
Streetscape
Improvements 










3,000,000
 60
Elizabeth NJ CDBG Midtown
Streetscape 










3,000,000
 60
Elizabeth NJ CDBG Library
Historic
Renova3on
‐
Exterior 










4,000,000
 80
Elizabeth NJ CDBG New
Animal
Shelter 










5,000,000
 100
Elizabeth NJ CDBG Rehabilita3on
Public
Parks 










5,000,000
 100
Elizabeth NJ CDBG Road
Resurfacing
‐
Various
Streets 








10,000,000
 200
Elizabeth NJ CDBG Midtown
Sewer
Improvements 








11,000,000
 220
Elizabeth NJ CDBG Flood
Relief 








35,000,000
 700
Elizabeth NJ Energy Solar
Program
Emergency
Response
Facility 












500,000
 10
Elizabeth NJ Energy Solar
Program
Erxleben
Recrea3on
Center 












500,000
 10
Elizabeth NJ Energy Solar
Program
Miller
Recrea3on
Center 












500,000
 10
Elizabeth NJ Energy Solar
Program
DPW
Maintenance
Facility 










1,000,000
 20
Elizabeth NJ Energy Solar
Program
Police
HQ 










1,000,000
 20
Elizabeth NJ Energy Public
Works
Recycling
Facility 










2,000,000
 40
Elizabeth NJ Housing Parking
Area
Repaving
at
Mravlag
Manor 














80,000
 7
Elizabeth NJ Housing Grounds
Improvements
at
Ford
Leonard 












120,000
 8
Elizabeth NJ Housing Security
Cameras
at
Mravlag
Manor 














90,000
 8
Elizabeth NJ Housing Building
Facade
Repair
at
Kennedy
Arms 












200,000
 10
Elizabeth NJ Housing Basement
Door
Replacement
&
Masonry
Restora3on
at
Mravlag
Manor 












300,000
 12
Elizabeth NJ Housing Fire
Alarm
System
Replacement
at
Mravlag
Manor 












650,000
 15
Elizabeth NJ Public
Safety Surveillance
Equipment
and
Fiber
Network 












750,000
 0
City State Program Project
Descrip3on Funding
Required Jobs
Elizabeth NJ Public
Safety Alcohol
Beverage
Control
Monitoring 












600,000
 6
Elizabeth NJ Public
Safety Juvenile
Proba3on
and
Parole
Monitoring 










1,200,000
 10
Elizabeth NJ Public
Safety Narco3cs
Enforcement
Officers 










1,200,000
 10
Elizabeth NJ Public
Safety Police
Officers
to
Monitor
Surveillance
Equipment 










1,200,000
 10
Elizabeth NJ Public
Safety School
Resource
Officers 










1,200,000
 10
Elizabeth NJ Public
Safety Police
HQ
Upgrades 










5,000,000
 100
Elizabeth NJ Public
Safety New
Firehouse
24‐26
South
Broad
Street 








10,000,000
 200
Elizabeth NJ Streets/Roads ADA
Upgrades
‐
Public
Sidewalk
Curb
Ramps 










2,000,000
 40
Elizabeth NJ Streets/Roads Intersec3on
Improvements 










5,000,000
 100
Elizabeth NJ Streets/Roads Road
Resurfacing 










5,000,000
 100
Elizabeth NJ Streets/Roads Upgrade
Traffic
Lights 










5,000,000
 100
Elizabeth NJ Streets/Roads Front
Street
Movable
Bridge 








10,000,000
 200
Elizabeth NJ Streets/Roads North
Avenue
Corridor
Improvements 






150,000,000
 3000
Elizabeth NJ Streets/Roads 






177,000,000
 3540
Elizabeth NJ Water Improvements
to
Bridge
Street
Siphons 










1,000,000
 20
Elizabeth NJ Water Summer
Street
Storm
Drainage
improvements 










1,000,000
 20
Elizabeth NJ Water Upgrade
at
Trenton
Avenue
Pump
Sta3on 










1,000,000
 20
Elizabeth NJ Water Weszield
Ave.
&
Elmora
Ave.
By‐Pass
Sewer 










1,000,000
 20
Elizabeth NJ Water Mafano
Park
Pump
Sta3on
Rehabilita3on 










2,000,000
 40
Elizabeth NJ Water Oakwood
Plaza
Sewers 










2,000,000
 40
Elizabeth NJ Water South
Second
Street
Pump
Sta3on
Rehabilita3on 










2,000,000
 40
Elizabeth NJ Water Cleaning
&
Lining
Water
Lines 










5,000,000
 100
Elizabeth NJ Water Elizabeth
River
Flood
Control
Project
Rehabilita3on 










5,000,000
 100
Elizabeth NJ Water Emergency
Sewer
Repairs 










5,000,000
 100
Elizabeth NJ Water Kapkowski
Road
Sewer
Improvements 








10,000,000
 200
Elizabeth NJ Water Verona
Avenue
Pump
Sta3on 








10,000,000
 200
Elizabeth NJ Water Dowd
Avenue
Pump
Sta3on 








40,000,000
 800
Hamilton NJ Energy Leeds
Program
Coordinator
to
promote
energy
efficient
construc3on
projects 












105,000
 1
Hamilton NJ Energy Library
Solar
Power 












125,000
 1
Hamilton NJ Energy Sewer
Plant
Methane
Gase
to
Electric 












675,000
 3
Hamilton NJ Public
Safety Tac3cal
Surveillance
Systems
‐
SWAT 














30,000
 1
Hamilton NJ Public
Safety Byrne
Grant
&
Municipal
Court
Sessions
‐‐
to
adjudicate
cases 












150,000
 2
Hamilton NJ Public
Safety Cops
‐
Gang
Response
Unit 












510,000
 5
Hamilton NJ Streets/Roads 2010
Capital
Program
‐‐
Reconstruct
($150/lf))
RECONSTRUCT:
Wesleyan
Drive
(House
#44)
to
Edinburg
Road 










2,899,750
 93
Hamilton NJ Water Emergency
Generator 












210,000
 3
Hamilton NJ Water East
State
Street
Pump
Sta3on
Upgrade 












325,000
 5
Hamilton NJ Water Elkton
Estates
Pump
Sta3on
Upgrade 












225,000
 5
Hamilton NJ Water Pump
Sta3ons
Telemetry 










1,700,000
 7
Hamilton NJ Water RBC
Odor
Control
and
Air
Filtra3on 










2,700,000
 15
Hamilton NJ Water Sewer
Line
Replacements 










3,500,000
 26
Hamilton NJ Water (Hamilton
Wastewater
U3lity
‐
Capital
Program
FY2008‐FY2009)
RBC
Odor
Control
and
Air
Filtra3on
Project
‐
Final
Phase
($2,395,000,




20
Jobs)
Treatment
Plant
De‐Watering
Screw
C 










8,358,500
 101
Irvington NJ CDBG Removal
and
Replacement
of
Underground
Storage
Tank
at
16th
Avenue
Public
Works
Garage.
The
township

has
a
limited
supply
of
gas
and
oil
tanks.
The
current
underground
tank
is
unregistered
and
cannot
be
used
as

per
State
of
NJ
regula3ons 












150,000
 4
Irvington NJ CDBG Repair
roof
of
Public
Works
Facility
on
Coit
Street.
This
ac3ve
public
works
facility
has
need
of
a
new
roof,

which
is
an
urgent
project. 












500,000
 5
Irvington NJ CDBG Moderniza3on
of
the
Service
Men's
Clubhouse.
This
building
is
owned
by
the
Township.
It
provides
limited
use

to
the
Township
in
its
current
unsafe
condi3on.
Its
repair
was
designed,
but
lack
of
funding
forestalls
its
repair.

The
building
will
be
used
as 












200,000
 8
Irvington NJ CDBG New
Fire
Training
Tower:
This
project
will
build
a
tower
to
be
used
as
fire
suppression
training
by
the
Fire

Department.
This
project
has
been
designed
and
is
ready
to
be
constructed 












700,000
 10
Irvington NJ CDBG New
trailblazing
system
through
the
Irvington
Center
and
along
major
principal
arterials 












800,000
 10
Irvington NJ CDBG Realign
20th
Avenue
at
Ellis
Avenue.
This
project
would
remove
a
dangerous
intersec3on.
It
would
provide

safety
in
a
designated
redevelopment
area
where
housing
development
is
taking
place. 












250,000
 10
Irvington NJ CDBG Repair
of
the
Elizabeth
River
Channel.
This
channel
courses
through
the
Township.
Its
walls
are
weak
and

broken. 










2,500,000
 10
Irvington NJ CDBG Nye
Avenue
Municipal
Parking
Garage
and
Plaza.
Expand
the
Twp
owned
parking
garage
and
create
a
public

use
plaza
that
connects
the
garage
to
Clinton
Avenue
a
principal
arterial
that
services
the
NJ
Transit
Bus

Terminal. 










1,500,000
 15
Irvington NJ CDBG Rehabilita3on
of
the
Orange
Sanitaty
Sewer
System.
This
system
is
deteriora3ng
and
is
collapsing
in
sec3ons
to

the
extent
that
the
Township
has
to
incur
emergency
repairs.
New
piping
and
fill
will
modernize
and
expand
its

sanitary
sewer
capacity. 










4,000,000
 15
Irvington NJ CDBG ADA
reconstruc3on
of
entrances
to
the
Twp
building 










1,000,000
 20
Irvington NJ CDBG Mill
Road
Streetscape:
This
project
will
improve
the
streetscape
of
a
road
that
connects
the
Garden
State

Parkway
to
a
redevelopment
area
and
will
provide
transit
and
auto
access
to
the
site.
This
area
will
develop

two
mixed
use
projects.
Both
are
undergo 












600,000
 20
Irvington NJ CDBG New
Fire
Sta3on/Emergency
Opera3ng
Center:
This
project
will
build
a
state‐of‐the‐art
for
emergency
fire

response
and
for
regional
training
involving
other
deparments
in
nearby
municipali3es. 










1,500,000
 20
Irvington NJ CDBG Rehabilita3on
of
Public
Safety/Municipal
Court
complex
including
new
floorplan
and
upgrade
jail
and
court

room. 










1,000,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Irvington NJ Energy Energy
retrofits
of
the
Gatling
Recrea3on
Center:
new
windows,roof
solar
panels,
new
energy
efficient
ligh3ng,

hea3ng
and
air
condi3oning.
This
is
an
ac3vely
used
recrea3on
center
and
is
cos3ng
the
Twp
with
inefficient

energy
consump3on. 












200,000
 10
Irvington NJ Public
Safety New
CAD/CPLIMS
criminal
repor3ng
system
with
personnel 












100,000
 2
Irvington NJ Public
Safety Geographic
Informa3on
System
with
personnel.
Purchase
aerials,
mapping
engine,
applica3ons
for
use
in
data

collec3on
and
analysis 










2,200,000
 3
Irvington NJ Public
Safety Hire
10
police
officers 












900,000
 10
Irvington NJ Public
Safety new
Gang
Response
Unit 












900,000
 10
Irvington NJ Schools Rebuild
the
high
school
football/track
field
to
professional
standards.
The
current
field
is
aged
and
worn.
The

track
field
is
undersized. 










2,000,000
 10
Newark NJ Amtrak The
AMTRAK
Railroad
is
presently
located
parallel
to
State
Route
21,
a
north
to
south
corridor
in
the
City
of

Newark.

The
railroad
is
an
overhead
travel
corridor
separa3ng
the
City's
East
Ward
and
Central
Ward

communi3es.

Poor
ligh3ng
or
non
existent 










1,000,000
 25
Newark NJ Amtrak The
McClellan
Street
Underpass
is

located
in
the
City
of
Newark's
South
Ward,
which
provides
access
to
the

Newark‐Liberty
Interna3onal
Airport.

The
underpass
allows
passage
under
the
AMTRAK
Railroad
on
the

Northeast
Corridor.

 








45,000,000
 100
Newark NJ CDBG Grace
West
Firehouse
Historic
Preserva3on
Project‐
Restora3on
and
preserva3on
of
abandoned
turn‐of
the

century
fire
house.

Currently
in
design/development 










1,500,000
 5
Newark NJ CDBG Ligh3ng
Improvements
to
Major
Corridors
Project
‐‐
Provide
consistent
ligh3ng
for
both
sides
for
the
length
of

two
major
corridors:
Bloomfield
Avenue
and
Springfield
Avenue 












500,000
 5
Newark NJ CDBG Downtown
District
Streetscape
Project:
Covers
equipment
purchase
Total
Equipment
Purchase,
Wiring,
and
Engineering
Cost:
$2.3
million
Addi3onal
Yearly
Fixture
Lease
and
Power
Consump3on
Cost:
$180,000/year
Commitment
made
by
previous
adminis 










2,300,000
 10
Newark NJ CDBG MLK
Homes
First
Time
Homebuyer‐
Assistance
in
LMI
first
3me
homebuyer
for
neighborhood
revitaliza3on

project 












500,000
 10
Newark NJ CDBG West
Ward
Abandoned
Property
Public
Facili3es‐
Street,
traffic
calming,
sidewalk
improvements
planned
and

pending
design.

Community
gardens
designed 










2,300,000
 10
Newark NJ CDBG 862
S.
Orange
Avenue
–
Nonprofit
rehabilita3on
of
10
unit
building
and
economic
development,
job
training

center 










1,400,000
 13
Newark NJ CDBG KBS
–
Acquisi3on/Predevelopment
–
Non‐profit
neighborhood
revitaliza3on
in
area
with
blighted
designa3on.


Includes
acquisi3on
funds,
predevelopment
costs
that
can
be
commifed
prior
to
90
days 










2,500,000
 15
Newark NJ CDBG Lincoln
Park
South
Park
Presbyterian
Church
Facade
3‐phase
project
by
Lincoln
Park
Coast
Cultural
District
(LPCCD)
Emergency
Stabiliza3on
Historic
Restora3on
Construc3on
of
Amphitheater
Total
project
cost:
$4
M
LPCCD.

has
secured
$1.5
M
from 










2,500,000
 15
Newark NJ CDBG Meeker‐
Elizabeth
Rehabilita3on
–
Rehabilita3on
of
mixed‐use
building 










2,000,000
 15
Newark NJ CDBG Miscellaneous
Unfunded
2008
CDBG
Public
Facili3es
Projects
from
applica3ons
submifed
by
local
nonprofit

organiza3ons
throughout
the
City
of
Newark 










6,265,000
 15
Newark NJ CDBG West
Ward
Abandoned
Property
Acquisi3on/Demoli3on–
Acquisi3on
of
approximately
25
private
abandoned

proper3es.

Proper3es
iden3fied
and
acquisi3on
in
process 










2,500,000
 15
Newark NJ CDBG West
Ward
Ini3a3ve
Public
Improvements
Project:

Improvements
to
West
Ward
Ini3a3ve
Target
Area
from

South
9th
Street
to
South
12th
Street
and
from
South

Orange
Avenue
to
Central
Avenue.
Infrastructure
improvements:
sidewalk
repairs,
curbs,
fen 










2,000,000
 15
Newark NJ CDBG Broad
Street
Sta3on
Infrastructure
Project:
Infrastructure
Improvements
to
leverage
hundreds
of
millions
of

dollars
for
private
investment
Demoli3on
of
public
facili3es
Reloca3on
of
the
Police
and
Fire
Departments
currently
on
Orange
Street 








10,000,000
 20
Newark NJ CDBG Downtown
Parking
Garage
Stand‐alone
garage
near
Broad
Street
Sta3on
or
Military
Park
250
spaces
at
$27,600/space

Should
be
managed
to
be
used
24/7
Office/Retail
during
the
day
Residen3al/Entertainment
at
night











7,000,000
 20
Broad
Street
Sta3on
Proximate
Newark NJ CDBG Newark
Gateways
Project
‐
The
City
of
Newark
has
iden3fied
27
gateways
which
will
all
undergo
a
prior3za3on

process
to
determine
gateways
merit
early
ac3on
for
revi3liza3on 










5,000,000
 20
Newark NJ CDBG ORR
Apartments
–
Rehabilita3on
of
21
unit
abandoned
building 










1,000,000
 26
Newark NJ CDBG BAT
Lobs
–
Rehabilita3on
and
Commercial
Development.

Commercial
por3on
of
mul3family,
mixed
income

project 










2,100,000
 65
Newark NJ CDBG CHEN
School
–
Development
of
new
day
care,
mixed
use
building
for
nonprofit
use,
public
facili3es.

Project

currently
in
design/development
phase 










3,500,000
 65
Newark NJ CDBG Restored
Homes
‐
First
Time
Homebuyer
and
Suppor3ve
Housing.

Project
includes
rehabilita3on
of
abandoned

structure
and
special
needs
housing.

Has
site
plan
approval
and
can
proceed
with
bidding 










2,500,000
 65
Newark NJ CDBG Roseville
Commons
–
New
mul3family
housing.

Project
has
site
plan
approval,
and
construc3on
contracts
have

been
bid.

Nonprofit
sponsor
in
blighted
area
makes
project
CDBG
eligible 










4,500,000
 65
Newark NJ CDBG Mul3family
Assisted
Housing
Capital
Improvement
Program 








40,000,000
 120
Newark NJ CDBG Acquisi3on
of
real
property
for
Minish
Park
project:

1.
Minish
Park
Phase
1A
–
Jefferson
to
Jackson
St
(2.8
acres)
‐‐$4,500,000‐6,000,000

2.
RAR
acquisi3on
(5.16
acres)
‐‐
$8,000,000










25,000,000
 150
3.
Minish
Park
Phase
1B
–
Jackson
St
to
Oxford
St
(3.82
acres
City State Program Project
Descrip3on Funding
Required Jobs
Newark NJ CDBG LPCCD
–
Non‐profit
sponsor
in
neighborhood
revitaliza3on
area,
eligible
new
construc3on
ac3vity.

Also,

predevelopment,
eligible
homebuyer
assistance
ac3vity.

Phase
II
has
site
plan
approval,
Phase
III
approval

pending 








15,000,000
 195
Newark NJ Energy As
a
green
ini3a3ve,
and
in
conjunc3on
with
PSE&G,
the
City
of
Newark
will
use
solar
energy
to
light
public,

city‐owned
buildings
and
street
lights.

In
addi3on,
the
regular
cobra
head
street
light
fixtures
will
be
replaced
by
induc3on
light
fixtur 










5,000,000
 100


Newark NJ Energy Residen3al
Project:
A.

Integra3ng
energy
efficiency
into
exis3ng
First
Time
Homeowner
Rehab
Assistance,
Senior
Rehab

Assistance,
and
incen3vizing
others
B.

Incen3vizing
owners
of
mul3‐family
proper3es
and
investment
proper3es
to
par3cipate
in 








13,200,000
 100
Newark NJ Energy Municipal
Project:

A.

Energy
Master
Plan
–
to
enhance
the
City’s
long
term
sustainability
and
create
a
blueprint
to
guide
public

and
private
investment.

B.

Facility
conserva3on
audits
(energy,
water
&
waste
water,
building
condi3ons)
of
municipal
 






115,700,000
 400
Newark NJ Energy Commercial:
A.

Small
and
mid
size
business
–
as
part
of
exis3ng
business
reten3on
and
expansion

B.

Large
Users
C.

Commercial
property
owners

D.

Sewage
Treatment
facili3es,
hospitals
and
non‐profits












5,700,000
 1000
Newark NJ Energy Transit
Project:
Newark
Elizabeth
Light
Rail 






694,000,000
 20000
Newark NJ Housing REAC
‐
Authority‐wide
Flooring
deficiency
correc3ons














293,625
 4
Newark NJ Housing REAC
‐
Authority‐wide
Misc.
Hazards
deficiency
correc3ons













238,500
 4
Newark NJ Housing REAC
‐
Authority‐wide
Electrical
deficiency
correc3ons 












318,000
 5
Newark NJ Housing REAC
‐
Authority‐wide
Lock/Hardware
deficiency
correc3ons 












313,100
 5
Newark NJ Housing REAC
‐
Authority‐wide
Door
deficiency
correc3ons 












803,000
 12
Newark NJ Housing REAC
‐
Authority‐wide
Kitchen
Appliance
deficiency
correc3ons 












909,000
 13
Newark NJ Housing REAC
‐
Authority‐wide
Window
deficiency
correc3ons 












966,250
 14
Newark NJ Housing Senior
Devt's
‐
(Vacant)
Apartment
Turnovers
 










1,511,000
 22
Newark NJ Housing REAC
‐
Authority‐wide
Mold/Air‐Quality
Abatements 










1,598,100
 23
Newark NJ Housing Senior
Devt's
‐
Roof
Replacements 










1,630,000
 24
Newark NJ Housing REAC
‐
Authority‐wide
Kitchen
Cabinet
deficiency
correc3ons 










2,212,200
 33
Newark NJ Housing Family
Devt's
Fire
Preven3on/Detec3on
Systems
 










2,380,000
 35
Newark NJ Housing Family
Devt's
Appliance
Renewal/Upgrades 










3,650,000
 54
Newark NJ Housing Senior
Devt's
‐
Exterior
(Site)
Renova3ons 










3,690,900
 54
Newark NJ Housing Family
Devt's
Secure
Entryway
Enhancements 










3,870,000
 57
Newark NJ Housing REAC
‐
Authority‐wide
Bathroom
deficiency
correc3ons 










4,192,000
 62
Newark NJ Housing Gigs
Foushee
Senior
Tower
HVAC
Improvements
 










4,340,000
 64
Newark NJ Housing Senior
Devt's
‐
Entryway
improvements 










4,475,000
 66
Newark NJ Housing Terrell
Homes
(Family
Dev't)
‐
Major
Electrical
Upgrades 










4,570,000
 67
Newark NJ Housing Family
Devt's
Site
Improvements
 










5,700,000
 84
Newark NJ Housing Townhouse
Devt's
‐
(Vacant)
Apartment
Turnovers
 










6,450,000
 95
Newark NJ Housing Townhouse
Devt's
‐
Periodic
Pain3ng
Program 










6,720,000
 99
Newark NJ Housing Senior
Devt's
‐
Facades
‐
Tuckpoin3ng
/
Lintel
/
Parapet
Repairs 










8,450,000
 124
Newark NJ Housing Family
Devt's
Accessibility
Improvements
(ADA) 








11,075,000
 163
Newark NJ Housing Senior
Devt's
‐
Environmental
Remedia3ons
‐
LBP,
ACM,
PCB 








13,700,700
 201
Newark NJ Housing Townhouse
Devt's
‐
Roof
Replacements 








20,600,000
 303
Newark NJ Public
Safety The
City
of
Newark
Police
Department’s
COPS
project
includes
hiring
50
police
officers
to
complement
our
 










1,630,782
 50
Newark NJ Schools The
Newark
Public
Schools
is
engaged
in
a
Long‐Range
Facili3es
Plan
to
replace
or
renovate
many
of
its
exis3ng
 








50,000,000
 500
Newark NJ Streets/Roads Broad
Street
is
appropriately
named
for
a
number
of
reasons.

Besides
its
substan3al
length
and
width,
it
acts

as
a
primary
visual
and
physical
corridor
link
between
Route
21
to
the
south
and
Bloomfield
Avenue
to
the

north.

 










7,000,000
 30
Newark NJ Streets/Roads The
City
of
Newark
is
currently
engaged
in
final
prepara3on
for
the
construc3on
of
the
Ferry
Street

Beau3fica3on.
This
project
seeks
to
improve
aesthe3cs
and
safety
within
the
East
Ward
by
providing
a

pedestrian
friendly
thoroughfare
 










5,000,000
 30
Newark NJ Streets/Roads The
City
of
Newark
is
currently
engaged
in
final
prepara3on
for
the
construc3on
of
the
East
Ferry
Street

reconstruc3on.
This
project
seeks
to
improve
aesthe3cs
and
safety
within
the
East
Ward

area
residents,

pedestrian
and
vehicular
traffic
friendly
 










5,500,000
 40
Newark NJ Streets/Roads Improvement
of
exis3ng
Conrail
bridge
on
Avenue
P
will
provide
adequate
overhead
clearance
for
truck

movements.
The
Avenue
P
bridge
is
an
overhead
railroad
bridge
now
u3lized
by
Conrail
to
distribute
and

collect
products
of
nearby
industries.
 










7,000,000
 60
Newark NJ Water Rehabilita3on
of
Meadowlands
Storm
Water
Pump
Sta3on.

The
Meadowlands
storm
water
pumping
sta3on

pumps
the
Peripheral
Ditch
surrounding
the
airport
which
receives
water
from
various
ditches
and
sewer

ouzalls.

The
pump
sta3on
is
in
need
of
rehabilit 










1,000,000
 10
Newark NJ Water Rehabilita3on
of
Storm
Sewer
Manholes
and
Catch
Basins
and
Storm
Water
Catch
Basin.

This
project
involves

the
replacement
of
collapsing
block
manholes,
cast
iron
cas3ng
and
manhole
covers.

We
have
determined

over
250
manholes
require
rehabilita3on
to 










2,275,000
 20
Newark NJ Water Replacement
of
Obsolete
Fire
Hydrants.

There
are
some
400
old
style
fire
hydrants
in
the
system
that
must
be

replaced
in
order
to
provide
proper
and
adequate
fire
flow
coverage
in
the
City 










1,800,000
 25
Newark NJ Water Replacement
of
Water
Main
Gate
Valves.

There
are
many
water
gate
valves
in
the
water
system
that
are
over

125
years
old
and
not
func3oning.

Some
valves
are
broken
in
either
the
open
or
closed
posi3ons.

When
there

is
a
need
to
shut
valves
to
deal
with 










3,000,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Newark NJ Water Cleaning
and
Lining
of
Old
Cast
Iron
Water
Mains.

This
will
improve
flow
though
the
system
and
improve
water

quality 








10,000,000
 50
Newark NJ Water Replacement
and
Upgrading
of
Obsolete
4‐inch
Water
Mains
to
6
and
8‐inch
Water
Mains.

Four
inch
water

mains
are
not
effec3ve
for
fire
figh3ng
and
cannot
deliver
the
needed
water
flow
for
the
areas.
 








10,000,000
 50
Newark NJ Water Replacement
of
Lead
Water
Services
from
the
Street
Water
Main
to
the
Water
Meter.

There
are
some
12,000

exis3ng
lead
water
service
pipes
in
the
City.

These
services
have
the
poten3al
of
having
lead
leach
into
the

served
facili3es
 








12,000,000
 50
Orange NJ CDBG Main
Street
Signage
including
Gateways,
Way
Finding
&
Displays 






250,000,000
 5
Orange NJ CDBG Road/Street
Improvements 










2,000,000
 7
Orange NJ CDBG Business
Training
Programs 










1,000,000
 10
Orange NJ CDBG Orange
Library
Rotunda
Restora3on
&
Landscaping 










2,500,000
 10
Orange NJ CDBG Public
Parking
Lots
Resurfacing
&
Beau3fica3on
for
Main
Street 










3,000,000
 10
Orange NJ CDBG City
Hall
Interior
&
Exterior
Renova3on
including
HVAC,
Rewiring
&
Servers 










5,000,000
 20
Orange NJ CDBG Streetscape
for
Central
Ave
Scotland
Road
Thoroughfares 










5,000,000
 20
Orange NJ CDBG City
Park
Improvements
including
Aqua3cs
Center 








10,000,000
 30
Orange NJ CDBG Expansion
&
Upgrade
of
10
Small
To
Medium
Businesses 










5,000,000
 50
Orange NJ CDBG Public
Library
Renova3on 








10,000,000
 50
Orange NJ Energy Solar
Panels
on
the
Orange
Reservoir
for
Renewable
Energy
Source 








50,000,000
 25
Orange NJ Energy Energy
Efficient
Retrofit
of
City
Owned
Buildings 










5,000,000
 50
Orange NJ Housing Demoli3on
of
Two
Public
Housing
Complexes 










1,500,000
 25
Orange NJ Housing Construc3on
of
New
Senior
Housing
Facility 








10,000,000
 50
Orange NJ Public
Safety Six
New
Fully
Equipped
Police
Vehicles 












216,000
 0
Orange NJ Public
Safety Computer
Aided
Dispatch
(CAD)
System 












270,000
 5
Orange NJ Public
Safety IT
Overhaul 












200,000
 5
Orange NJ Public
Safety Reverse
911
System 












250,000
 5
Orange NJ Public
Safety Video
Monitoring
System
at
Police
Headquarters 












265,000
 5
Orange NJ Public
Safety City‐Wide
Camera
Monitoring
System 










1,000,000
 25
Orange NJ Schools Orange
High
School
mobility
elevator 














75,000
 10
Orange NJ Schools Forest
St.
floor
3les
replacement 












142,000
 38
Orange NJ Schools Central
School
floor
3les
replacement 












131,000
 42
Orange NJ Schools Heywood
Ave.
School
floor
3les 












130,000
 60
Orange NJ Schools Administra3on
Bulding
roof
replacement 












175,000
 75
Orange NJ Schools Orange
Middle
School
stair
replacement 












125,000
 80
Orange NJ Schools Orange
High
School
generator
replacement 












375,000
 105
Orange NJ Transit Train
Shufle
from
Various
Points
in
the
City 












500,000
 3
Orange NJ Transit Improve
the
Tony
Galento
Plaza
at
Orange
Train
Sta3on 












250,000
 10
Orange NJ Transit Exterior
Improvements
for
the
Highland
Avenue
Train
Sta3on 










1,500,000
 15
Orange NJ Water Replacement
of
the
Chestnut
Street
Pump
Sta3on 








11,000,000
 50
Piscataway NJ CDBG Kennedy
Library
Expansion 










1,500,000
 15
Piscataway NJ CDBG Public
Works
Expansion 










2,500,000
 15
Piscataway NJ CDBG Senior
Center
Expansion 










3,000,000
 15
Piscataway NJ CDBG Community
Center 








16,000,000
 125
Trenton NJ Amtrak Railroad
Bridge
Project
‐
renova3on
of
three
city
bridges
along
the
Northeast
Corridor
train
line 








35,000,000
 350
Trenton NJ CDBG North
Clinton
Avenue
Library/Community
Center
‐
moderniza3on
of
current
library
and
crea3on
of
community

space
at
that
loca3on 










1,000,000
 10
Trenton NJ CDBG Trenton
Club
Renova3on
Project
‐
construc3on
of
coeduca3onal
exercise
facility 












500,000
 10
Trenton NJ CDBG Conversion
of
Old
Dickinson
facility
into
Modern
Library
‐
conversion
of
East
Trenton
historic
buiding
into
a
fully

func3oning
library 










2,000,000
 20
Trenton NJ CDBG Eagle
Tavern
Development
‐
interior
improvements/upgrades
of
landmark
building
for
future
use
as
a

restaurant
or
office
building 










2,000,000
 20
Trenton NJ CDBG Municipal
Street
Reconstruc3on
‐
municipal
roads,
sidewalks
and
intersec3on
improvements 










2,000,000
 20
Trenton NJ CDBG Vista
Center
Street
Project
‐
storm
drainage
reloca3on,
sewer
reloca3on
and
intersec3on
improvements
next

to
Trenton
Train
Sta3on 










1,800,000
 20
Trenton NJ CDBG Maintenance
of
City
Owned
Buildings
‐
Neighborhood
Stabiliza3on
Program
to
eradicate
blight 










2,000,000
 25
Trenton NJ CDBG New
Municipal
Court
Project
‐
conversion
of
retail
complex
for
reloca3on
of
municipal
court
opera3ons 










4,000,000
 40
Trenton NJ CDBG Port
of
Trenton
Museum
‐
reconstruc3on
of
historic
building
into
a
mari3me
musuem 










4,000,000
 40
Trenton NJ CDBG Canal
Banks
Commercial
Development
‐
crea3on
of
neighborhood
retail
space 










2,000,000
 45
Trenton NJ CDBG Capitol
City
Partnership
Project
‐
ligh3ng
and
streetscape
improvements
to
promote
public
safety
and
private

sector
investment
for
mixed
use
neighborhood
next
to
State
House 










4,000,000
 70
Trenton NJ CDBG Magic
Marker
Road
Construc3on
‐
infrastructure
development
at
a
former
brownfields
site
converted
to

residen3al
community 










1,600,000
 72
Trenton NJ CDBG Construc3on
of
a
new
consolidated
Public
Works
Facility 










8,000,000
 80
Trenton NJ CDBG Shiloh
CDC
Training
Facility
‐
conversion
of
industrial
facility
into
neighborhood
life
center 










5,000,000
 85
Trenton NJ CDBG Trenton
YMCA
Project
‐
par3al
funding
to
assist
in
the
construc3on
of
a
$20
million
YMCA
facility 










6,000,000
 85
Trenton NJ CDBG Museum
of
Contemporary
Science
‐
crea3on
of
a
science
musuem
at
a
former
industrial
site 








30,000,000
 305
Trenton NJ Energy City
Buildings
Retro‐fiqng
Project
‐
retro‐fit
city
buildings
into
more
energy
efficient
facili3es 








12,000,000
 120
Trenton NJ Energy Trenton
Microload
Project
‐
installa3on
of
solar
panels
on
750
residen3al
units 








45,000,000
 450
Trenton NJ Housing Public
Housing
Interior
Renova3on
Project
‐
interior
improvements
to
140
housing
units 










2,400,000
 24
Trenton NJ Housing Campbell
Homes
Renova3on
Project
‐
renova3ons
to
the
interior
and
exterior
of
24
public
housing
units 










5,500,000
 55
Trenton NJ Housing Senior
Grant
Program
‐
funding
for
an
emergency
repair
program
for
senior
ci3zens
to
bring
their
units
up
to

code
using
local
minority
contractors

 










3,500,000
 60
Trenton NJ Housing Public
Housing
Renova3on
‐
renova3ons
to
the
interior
and
exterior
of
159
housing
units 










9,000,000
 90
City State Program Project
Descrip3on Funding
Required Jobs
Trenton NJ Public
Safety Police
Technology
Upgrades
‐
upgrades
to
the
police
equipment 










3,000,000
 30
Trenton NJ Public
Safety Radio
Communica3on
Systems
Project
‐
radio
communica3on
improvements
to
the
Police
Department 










3,000,000
 30
Trenton NJ Schools Trenton
Public
Schools
Building
Rehabilita3on
and
System
Replacements 










1,100,000
 20
Trenton NJ Streets/Roads South
Warren
and
Market
Street
Boulevard
Project
‐
reconstruc3on
and
realignment
of
South
Warren
and

Market
Streets
into
a
boulevard 










5,300,000
 50
Trenton NJ Transit Route
29
Boulevard
Break‐out
Project
‐
Improvements
to
the
intersec3on
of
Bridge
and
Ferry
Streets 












400,000
 4
Trenton NJ Transit Downtown
Trolley
Shufle
‐
lease
of
two
energy
efficient
trolleys
to
and
from
Trenton
train
sta3on
and
Office

Complex 












600,000
 6
Trenton NJ Transit Route
29
Boulevard
Break‐out
Project
‐
Reconnec3on
of
Memorial
Drive 










1,000,000
 10
Trenton NJ Water Broad
and
Warren
Street
Culvert
‐
Dayligh3ng
of
the
Assunpink
Creek
culvert
between
Warren
and
Broad

Streets 










4,500,000
 45
Trenton NJ Water Water
Reservoir
Cover
Project
‐
crea3on
of
city
reservoir
cover
for
the
reduc3on
of
microbial
pathogens
in

drinking
water 








15,000,000
 150
Alamogordo NM Airport Renova3ons
and
Expansion
of
the
Airport
Terminal,
including
the
addi3on
of
a
second
floor
and
handicap

access
to
the
second
floor 










2,500,000
 2
Alamogordo NM Airport Security
Upgrades
to
Airport
Infrastructure
‐
Addi3onal
Perimeter
Fencing,
Motorized
Gates,
Computerized

Card
Access
System,
Security
Cameras
(airport
wide),
terminal
security
system,
perimeter
breech 










1,500,000
 2
Alamogordo NM Airport Expansion
of
main
runway
to
9,200
feet
(with
parallel
taxiway) 










3,000,000
 3
Alamogordo NM Airport Airport
Culvert,
Drainage,
and
Erosion
Control
Project
which
includes:
drainage
ditch
excava3on
and
re‐grade,

installing
drainage
structures,
plan3ng
low‐water,
low‐height
ground
cover
along
taxiway
&
taxi‐lane
shoulders

and
runway/taxiway
islands
 








10,000,000
 10
Alamogordo NM Airport Paving
&
Extension
(to
7,400
feet)
of
the
Cross‐Wind
Runway
with
parallel
taxiway
at
Alamogordo
‐
White

Sands
Regional
Airport 








10,000,000
 10
Alamogordo NM Energy Solar
hea3ng
panels
for
Olympic
size
pool
at
Family
Recrea3on
Center,
open
and
heated
year
round 












200,000
 1
Alamogordo NM Housing Plaza
Hacienda
Public
Housing
Authority
complex,
an
electrical
upgrade
to
new
breaker
boxes,
panels,
and

individual
meters,
and
the
installa3on
of
new
overhead
distribu3on
lines
and
transformers 










2,000,000
 4
Alamogordo NM Public
Safety DPS
equipment:
Radio
and
repeater
equipment
replacement
program
to
meet
new
FCC
standards 












700,000
 0
Alamogordo NM Public
Safety Fire
Sta3on
#8
‐
construct
a
new
fire
sta3on
on
the
northwest
side
of
town 












800,000
 3
Alamogordo NM Streets/Roads Addi3on
to
the
mul3‐purpose
fitness
trails,
which
loop
all
major
City
services.
8’
wide
asphalt
path 














75,000
 0
Alamogordo NM Streets/Roads 9th
Street
drainage
bridge
re‐build,
to
re
open
9th
Street.
 












150,000
 1
Alamogordo NM Streets/Roads City
entry‐way
streetscape
beau3fica3on
and
welcome
signs 












100,000
 1
Alamogordo NM Streets/Roads Hooser
Park
Deten3on
pond
for
drainage
 














70,000
 1
Alamogordo NM Streets/Roads 1st
Street
realignment
west
of
White
Sands
Blvd
to
the
Relief
Route,
par3ally
completed 












500,000
 3
Alamogordo NM Streets/Roads Desert
Lakes
Road
to
Dr.
Mar3n
Luther
King
Drive
Roads
Improvement,
road
construc3on
to
cross
US
Hwy
54 












400,000
 3
Alamogordo NM Streets/Roads Intersec3on
of
Florida
Avenue
and
Fairgrounds
Road 












440,000
 3
Alamogordo NM Streets/Roads ADA
corridors
con3nuing
arterials,
throughout
town
 










1,000,000
 4
Alamogordo NM Water Waste
Water
Treatment
Plant
plan/
design 










1,500,000
 0
Alamogordo NM Water Reclaimed
Water
Distribu3on
&
Storage,
treated
water
irriga3on
system 












500,000
 2
Albuquerque NM Airport Fiber
Op3c
System
Expansion 










1,000,000
 10
Albuquerque NM Airport FUDS
(Formerly
Used
Defense
Site)
Clearance 










8,000,000
 20
Albuquerque NM Airport FUDS
(Formerly
Used
Defense
Site)
Clearance 










8,000,000
 20
Albuquerque NM Airport Storm
Drain
Improvements 










2,000,000
 20
Albuquerque NM Airport Airport
Communica3ons
Center 










6,000,000
 50
Albuquerque NM Airport South
General
Avia3on
Parking
Lot
Replacement 










2,000,000
 50
Albuquerque NM Airport Sunport
Boulevard
Mill
and
Repave 










2,000,000
 50
Albuquerque NM Airport Runway
4‐22
Reconstruc3on 










7,000,000
 75
Albuquerque NM Airport South
General
Avia3on
Apron
Replacement 










9,000,000
 75
Albuquerque NM Airport Airport
Terminal
Op3miza3on 








13,000,000
 150
Albuquerque NM CDBG Dennis
Chavez
Community
Center
Improvements
(HVAC,
roof
&
doors) 












250,000
 9
Albuquerque NM CDBG Rape
Crisis
ADA
Improvements 












250,000
 9
Albuquerque NM CDBG SE
Heights
Area
‐
CD
Improvements
(Ligh3ng,
Sidewalks,
CPTED
&
Streetscapes) 












250,000
 9
Albuquerque NM CDBG United
South
Broadway
Corpora3on
Youth
Training
Center 












300,000
 11
Albuquerque NM CDBG Barelas
Community
Center
(Landscaping
&
historical
doors) 












350,000
 12
Albuquerque NM CDBG Thomas
Bell
Community
Center
‐
Fitness
Center 












350,000
 12
Albuquerque NM CDBG Affordable
Housing
Development
Improvements
(Streets,
Drainage,
Lights
&
U3lity
Expansion) 












500,000
 18
Albuquerque NM CDBG NM
Aids
Services
Shelter
Reconstruc3on 












500,000
 18
Albuquerque NM CDBG East
Central
Dental
&
WIC
Center
(Remodel,
Roof,
HVAC
&
Expansion) 












535,000
 19
Albuquerque NM CDBG Balloon
Park
ADA

Restrooms
&
Sewer
Line 












700,000
 25
Albuquerque NM CDBG Barelas
Community
Development
Improvements
(Trees,
Ligh3ng,
Sidewalks
) 












900,000
 32
Albuquerque NM CDBG Albuquerque
Rescue
Mission
(Acquisi3on
&
Expansion) 










3,000,000
 35
Albuquerque NM CDBG Trumbull
Rental
Facade
Improvements 










1,000,000
 35
Albuquerque NM CDBG Mesa
Verde
Community
Center
Improvements
(Phase
3
‐
add
Head
Start
classroom,
kitchen
&
site

improvements) 










1,100,000
 39
Albuquerque NM CDBG Non‐Profit
Facility
Acquisi3on/Renova3on 










1,500,000
 53
Albuquerque NM CDBG Westgate
Community
Center
Improvements
(Mul3‐purpose
addi3on
design,
roof,
HVAC,
intrusion
&
fire
alarm

system) 










1,500,000
 53
Albuquerque NM CDBG Alamosa
Community
Center
Property
Purchase
&
Expansion 










2,000,000
 70
Albuquerque NM CDBG Capital
Improvements
to
Community
Dental
Services
Facili3es,
Hinkle
Southeast 










2,000,000
 70
Albuquerque NM CDBG Cesar
Chavez
Community
Center
‐
New
Roof
and
educa3onal
center
addi3on 










2,000,000
 70
Albuquerque NM CDBG Jerry
Kline
Recrea3on
Center,
Construct
community
indoor
athle3c
center 










3,500,000
 70
Albuquerque NM CDBG Nob
Hill
Parking
Garage,
provide
merchant
parking
for
redeveloping
commerical
corridor 










2,000,000
 70
Albuquerque NM CDBG Trumbull
Phase
2
(Streets,
Sewer
&
Water) 










2,000,000
 70
City State Program Project
Descrip3on Funding
Required Jobs
Albuquerque NM CDBG North
Domingo
Baca
Mul3‐Purpose
Community
Center 










7,500,000
 200
Albuquerque NM CDBG North
Fourth
Street,
streetscape
to
improve
blighted
area 










7,750,000
 200
Albuquerque NM CDBG Los
Duranes
Mul3‐Purpose
Center,
reconstruc3on
of
condemmed
facility 










6,000,000
 210
Albuquerque NM CDBG Westgate
Community
Center,
demolish
or
relocate
and
construct
mul3‐purpose
center 










6,000,000
 210
Albuquerque NM CDBG Singing
Arrow
Community
Center,
Reconstruct
Community
Center 










7,000,000
 245
Albuquerque NM CDBG Unser
Central
Regional
Library,
provide
library
for
under‐served
area
of
City 










8,650,000
 280
Albuquerque NM CDBG Wilson
Junior
High
Pool,
renovate
and
enclose 










8,000,000
 280
Albuquerque NM CDBG New
York
Metropolitan
Area
Streetscape,
improve
blighted
area 








10,000,000
 350
Albuquerque NM CDBG Albuquerque
Rail
Yards
Redevelopment,
environmental
remedia3on
Phase
I
and
development
of
affordable

housing
component,
economic
development,
quality
of
life,
and
historic
preserva3on
for
Downtown

Albuquerque 








20,000,000
 700
Albuquerque NM CDBG Streetscape
Central
Avenue
from
Washington
street
to
Eubank
Blvd 








20,000,000
 700
Albuquerque NM CDBG New
Mexico
Events
Center,
Hotel
and
Events
Center
and
realted
infrastructure
located
in
Downtown

Albuquerque 






418,300,000
 14000
Albuquerque NM Energy Municipal
Facility
Renewable
Energy
Retrofit
‐
Police
Sta3ons 












525,000
 1
Albuquerque NM Energy Municipal
Facility
Renewable
Energy
Retrofit
‐
Fire
Sta3ons 










1,575,000
 3
Albuquerque NM Energy Municipal
Facility
Renewable
Energy
Retrofit
‐
Support
facili3es 










1,875,000
 4
Albuquerque NM Energy Municipal
Facility
Renewable
Energy
Retrofit
‐
Parking
Lot
Shade
&
Solar 










2,500,000
 5
Albuquerque NM Energy Municipal
Facility
Renewable
Energy
Retrofit
‐
Parks 










2,500,000
 5
Albuquerque NM Energy Municipal
Facility
Renewable
Energy
Retrofit
‐
Senior
&
Community
Centers 










2,250,000
 5
Albuquerque NM Energy Sunport
Solar
Array
‐
3.675
MW
field
mounted 








34,575,000
 7
Albuquerque NM Energy Solar
Charge
Sta3on
&
Plugin
Hybrid
/
Electric
Vehicle
Program 










2,150,000
 11
Albuquerque NM Energy LA
Landfill
‐
Methane
to
Energy
project 










6,650,000
 15
Albuquerque NM Energy Sunport
Solar
Array
on
Parking
Garage 








10,500,000
 20
Albuquerque NM Energy Cerro
Colarado
‐
Methane
to
Energy
project 








14,550,000
 30
Albuquerque NM Energy Small
Business
Energy
Audit
&
Retrofit
Program 










5,000,000
 50
Albuquerque NM Energy Double
Eagle
Wind
Farm
‐
100
MW 






140,000,000
 60
Albuquerque NM Energy Residen3al
Solar
Incen3ve
program 








10,000,000
 70
Albuquerque NM Energy Small
Business
Solar
Incen3ve
program 








10,000,000
 70
Albuquerque NM Energy Cerro
Colorado
Landfill
‐
40
MW
concentrated
solar
plant 






213,000,000
 80
Albuquerque NM Energy Residen3al
Energy
Audit
&
Retrofit
Program 










8,000,000
 80
Albuquerque NM Energy Purchase
residen3al
recycling
collec3on
vehicles
and
carts
to
implement
a
citywide
residen3al
single
stream

cart‐based
recycling
collec3on
program 








18,000,000
 100
Albuquerque NM Energy Neighborhood
Energy
Genera3on
Pilot
Project 






250,000,000
 125
Albuquerque NM Energy Double
Eagle
Concentrated
Solar
Plant
‐
100
MW 






532,000,000
 200
Albuquerque NM Energy Municipal
Facili3es
Renewable
Energy
Retrofit
program
‐
200
Facili3es 








72,000,000
 216
Albuquerque NM Energy Construct
a
LEED
cer3fied
eco‐friendly
city
solid
waste
transfer
sta3on
to
accommodate
the
transfer
of
refuse

and
recycling
from
residents
and
businesses. 








13,000,000
 355
Albuquerque NM Energy Construct
a
LEED
cer3fied
eco‐friendly
city
materials
recovery
facility
(MRF)
to
accommodate
the
increased

flow
of
recycling
from
residents
and
businesses. 








21,000,000
 735
Albuquerque NM Housing 514
Morris
Development‐NM1‐15A,
24
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and

Fixtures,
Floor
coverings
and
Windows. 












405,600
 6
Albuquerque NM Housing 716
Morris
Development‐NM1‐15B,
14
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and

Fixtures,
Floor
coverings
and
Windows. 












236,600
 6
Albuquerque NM Housing Broadway
Development‐NM1‐12,
30
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and

Fixtures,
Floor
coverings
and
Windows. 












507,000
 6
Albuquerque NM Housing Copper
Development‐NM1‐23,
48
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and

Fixtures,
Floor
coverings
and
Windows. 












811,200
 6
Albuquerque NM Housing Grove
Development‐NM1‐13A,
18
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and

Fixtures,
Floor
coverings
and
Windows. 












304,200
 6
Albuquerque NM Housing Roma
Development‐NM1‐11,
50
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and

Fixtures,
Flooring
coverings
and
Windows. 












845,000
 6
Albuquerque NM Housing Embudo
Towers
Development‐NM1‐10,
101
units.
Replace
all
Cabinets‐Countertops
and
Fixtures,
Floor

coverings. 












590,300
 8
Albuquerque NM Housing Sunset
Gardens
Development‐NM1‐14A,
58
units.
Install
new
aqc
insula3on.
Replace
all
Interior
and
Exterior

Doors,
Cabinets‐Countertops,
Floor
coverings
and
Windows. 












980,200
 9
Albuquerque NM Housing 60th
Street
Development‐NM1‐14B,
42
units.
Install
new
aqc
insula3on.
Replace
all
Interior
and
Exterior

doors,
Cabinets‐Countertops
and
Fixtures,
all
Floor
coverings
and
Windows. 












785,500
 10
Albuquerque NM Housing Don
Gabal
Development‐NM1‐18,
31
units.
Replace
all
Interior
and
Exterior
doors,
Cabinets‐Countertops
and

Fixtures
and
all
Floor
coverings.
Replace
all
Windows. 












524,000
 10
Albuquerque NM Housing Lafayefe
Development‐NM1‐15C,
18
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and

Fixtures,
Floor
coverings
and
Windows. 












304,200
 10
Albuquerque NM Housing Pennsylvania
Development‐NM1‐15E,
20
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops

and
Fixtures,
Floor
coverings
and
Windows. 












338,000
 10
Albuquerque NM Public
Safety Cyber
Crime
Unit
hardware,
sobware,
training
and
equipment 










1,000,000
 3
Albuquerque NM Public
Safety Bell
B3
Helicopter 










3,750,000
 4
Albuquerque NM Public
Safety Forensic
Scien3sts 












325,000
 8
Albuquerque NM Public
Safety Cyber
Crimes
Unit
Staff 












915,000
 12
Albuquerque NM Streets/Roads Menaul
Boulevard
Extension 












500,000
 10.5
Albuquerque NM Streets/Roads Bike
Boulevards 












500,000
 14
Albuquerque NM Streets/Roads Central
Bridge
Improvements
at
the
Alvarado
Transporta3on
Center 












500,000
 17.5
Albuquerque NM Streets/Roads Mountain
Road
pedestrian
ligh3ng
and
streetscape
improvements 










1,500,000
 35
Albuquerque NM Streets/Roads Nob
Hill
Parking
and
Pedestrian
Improvements 










1,500,000
 35
Albuquerque NM Streets/Roads North
Diversion
Channel
Trail
Phase
II 










1,000,000
 35
City State Program Project
Descrip3on Funding
Required Jobs
Albuquerque NM Streets/Roads Ouray
and
Ladera
West
Improvements 










1,000,000
 35
Albuquerque NM Streets/Roads South
Broadway
Storm
Drain,
improvements
to
remove
neighborhood
from
flood
plain 










1,500,000
 35
Albuquerque NM Streets/Roads Median
Enhancement
(interstates
and
arterials) 










6,000,000
 50
Albuquerque NM Streets/Roads University
Boulevard
Phase
II 










5,000,000
 50
Albuquerque NM Streets/Roads Academy
Bike
Lanes 










1,500,000
 52.5
Albuquerque NM Streets/Roads Eubank
Blvd
and
Candelaria
median
landscaping 










2,500,000
 70
Albuquerque NM Streets/Roads I‐40
Trail
and
Rio
Grande
Crossing 










2,000,000
 70
Albuquerque NM Streets/Roads Reconstruct
intersec3on
of
Central
Avenue
and
Yucca
Street
to
improve
obsolete
intersec3on
cross
sec3on 










2,000,000
 70
Albuquerque NM Streets/Roads Eubank
and
Central
Intersec3on
Improvements 










2,500,000
 87.5
Albuquerque NM Streets/Roads Streetscape,
Southern
to
Eubank,
develop
commericial
corridor
at
major
employment
center 










3,000,000
 100
Albuquerque NM Streets/Roads Atrisco
Drive
Improvements 










3,100,000
 108.5
Albuquerque NM Streets/Roads Fortuna
Road
Imrovements 










4,000,000
 126
Albuquerque NM Streets/Roads Bear
Canyon
I‐25
Pedestrian
Bridge 










3,900,000
 136.5
Albuquerque NM Streets/Roads Street
Total
Reconstruc3on
10
streets 










3,900,000
 136.5
Albuquerque NM Streets/Roads Morris
Street
bridge
over
I‐25.
Improved
access
to
major
employment
center 










6,000,000
 210
Albuquerque NM Streets/Roads Paradise
Boulevard
Widening 










6,000,000
 210
Albuquerque NM Streets/Roads Wyoming
Boulevard
Widening
Phase
I
(from
Academy
to
Alameda) 










6,000,000
 210
Albuquerque NM Streets/Roads Unser
Boulevard
from
San
Ygnacio
to
Senator
Dennis
Chavez 










6,500,000
 227.5
Albuquerque NM Streets/Roads Central
Avenue
Streetscape,
Moon
to
Tramway,
improve
raodway
through
redeveloping
commercial
corridor 










7,000,000
 245
Albuquerque NM Streets/Roads Paseo
del
Vulcan
(east
alignment)
from
Paseo
del
Norte
to
Southern
Road
in
Rio
Rancho,
construct
two
lane

arterial
to
provide
conges3on
relief
for
western
arterials
of
regional
raodway
system 










7,000,000
 245
Albuquerque NM Streets/Roads ADA
Enhancements
Citywide 








10,000,000
 350
Albuquerque NM Streets/Roads New
Mexico
Events
Center
Road
and
U3lity
improvements,
downtown
Albuquerque.

Provide
necessary

infrastructure
for
economic
development
purposes 








10,900,000
 350
Albuquerque NM Streets/Roads Coors
Blvd
traffic
flow
improvements
for
commuter
routes 








18,000,000
 630
Albuquerque NM Streets/Roads District
3
storm
drain,
improvements
to
remove
neighborhood
from
the
flood
plain 








18,850,000
 630
Albuquerque NM Streets/Roads North
Domingo
Baca
Arroyo
Boulevard
construc3on
four
lane
arterial
to
provide
local
access
to
businesses

adjoining
a
limited
expressway 








40,000,000
 1400
Albuquerque NM Streets/Roads Paseo
del
Norte
I‐25
interchange,
reduce
conges3on
on
regional
raodway
system 






300,000,000
 10000
Albuquerque NM Transit Bus
benches
and
shelters
along
arterials
in
southeast
quadrant
of
city 












200,000
 5
Albuquerque NM Transit Singing
Arrow
Park
and
Ride,
improve
mul3‐modal
service
from
East
Mountains
to
Albuquerque
employment

centers 










3,000,000
 40
Albuquerque NM Transit Expansion
of
bus
rapid
ride
transit 










5,000,000
 50
Albuquerque NM Transit Park
and
Ride
expansion 










7,500,000
 50
Albuquerque NM Transit Replacement
of
out
of
date
fleet 








35,000,000
 75
Albuquerque NM Transit Shelter
and
upgrade
of
transit
facility 








25,000,000
 200
Albuquerque NM Transit New
Mexico
Train
Track
Plaza
canopy
and
plazorms
to
improve
a
commuter/AMTRAK
Sta3on 








13,300,000
 455
Albuquerque NM Transit Street
Car
Phase
I
Central
Avenue 








90,000,000
 500
Albuquerque NM Water Mountain
Road
Storm
Drain 










1,200,000
 35
Albuquerque NM Water Mary
Ellen
Storm
Drain 










1,700,000
 59.5
Albuquerque NM Water Tingley
Beach
water
conserva3on
project
in
collabora3on
with
the
Army
Corp
of
Engineers
and
Bureau
of

Reclama3on.
Goal:
water
conserva3on
and
sustainability. 










8,000,000
 65
Albuquerque NM Water Arroyo
and
Channel
Rehabilita3on
(Citywide) 










3,000,000
 100
Albuquerque NM Water San
Pedro
Storm
Drain
Improvement 










3,200,000
 112
Albuquerque NM Water Moon
Street
Storm
Drain 










3,700,000
 129.5
Albuquerque NM Water Post
Office
Broadway
Pump
Sta3on
and
related
Mar3neztown
Storm
Drainage
Improvements 








45,000,000
 150
Albuquerque NM Water Coal
Street
Storm
Drain
Improvement 










5,000,000
 175
Bayard NM CDBG Community
Center
expansion
and
renova3on.

To
create
a
covered
and
fenced
outdoor
area,
expand
to
create

a
equipment
storage
area
and
improvements/repairs
to
exis3ng
building. 












300,000
 5
Bayard NM CDBG Community
Park.

Would
provide
for
addi3onal
construc3on
of
the
community
park
that
is
currently
in

construc3on.

Current
project
is
for
sidewalks,
shade
structures
and
gazeboo. 












400,000
 6
Bayard NM CDBG Public
library
renova3on
and
expansion.

Will
create
a
larger
library
to
create
a
learning
center
for
various

groups
to
use. 










1,000,000
 10
Bayard NM CDBG Reconstruc3on
of
local
streets
and
state
highway. 










3,500,000
 20
Bayard NM CDBG Water
and
sewer
line
installa3on
and
replacement
improvements
to
22
areas
throughout
town. 










3,500,000
 30
Bayard NM Water Water
storage
tank
demoli3on,
overhead
water
line
crossing
to
main
water
wells,
two
new
water
wells 










1,000,000
 10
Espanola NM CDBG Incubator
building
for
economic
development 










2,000,000
 60
Espanola NM Public
Safety Replacement
fire
engine 












300,000
 0
Espanola NM Streets/Roads Railroad
Avenue
extension
and
realignment
with
Espanola
Mainstreet 










1,500,000
 40
Espanola NM Streets/Roads Replacement
of
Onate
Bridge
to
align
with
Main
Street 










2,000,000
 60
Espanola NM Streets/Roads Industrial
Park
Road
reconstruc3on
and
drainage
improvements 










3,500,000
 105
Espanola NM Streets/Roads North
McCurdy
Road
surface
and
storm
drainage
enhancements 










5,000,000
 150
Espanola NM Water Improvements
to
KDCE
lib
sta3on 












250,000
 10
Espanola NM Water New
water
storage
tank
to
serve
regional
water
partners
for
domes3c
use
and
fire
supression 












500,000
 15
Espanola NM Water Replacement
of
water
storage
tank
for
domes3c
use
and
fire
supression 












500,000
 15
Espanola NM Water Restora3on
of
Well
9
to
service
by
installing
horizontal
wells 










1,000,000
 30
Espanola NM Water Water
treatment
system
‐
uranium
treatment 










1,200,000
 36
Espanola NM Water North
Prince
Drive
extensions
of
water
and
wastewater
services 










2,000,000
 60
Espanola NM Water Installa3on
of
sanitary
sewer
lines
to
residents
utlitzing
individual
sep3c
systems
within
city
limits 










2,000,000
 120
Espanola NM Water Replacement
of
west
side
sanitary
sewer
lines
‐
original
installa3on
1950's 










5,000,000
 150
Las
Cruces NM CDBG Main
Street
Plaza.
Construct
Civic
Plaza
as
a
focal
point
of
Downtown
Revitaliza3on. 










3,000,000
 45
City State Program Project
Descrip3on Funding
Required Jobs
Las
Cruces NM CDBG Main
Street
Revitaliza3on.

Correct
outdated
traffic
pafers
from
one‐way
to
two‐way
streets.
Add
pedesrtrian
safety
features. 










3,500,000
 75
Rio
Rancho NM Streets/Roads Arsenic
Removal
at
Wells
#3
and
#15
‐
Complies
with
a
federal
unfunded
mandate
for
drinking
water
systems. 










4,500,000

Rio
Rancho NM Streets/Roads Cherry
Road
Reconstruc3on
‐
Rebuilds
an
exis3ng
road
that
is
in
very
poor
condi3on. 










3,500,000

Rio
Rancho NM Streets/Roads Northern
Blvd.
Widening
‐
Widens
Northern
Blvd.
from
35th
Ct.
to
just
west
of
Unser
Blvd.
This
project
can
be

phased
if
necessary. 










8,000,000

Rio
Rancho NM Streets/Roads Paseo
del
Volcan
‐
Builds
a
vital
new
arterial
from
US
550
to
Iris
Road. 








16,000,000

Santa
Fe NM Airport Fire
Figh3ng
Personnel
Safety
Equip. 












100,000
 1
Santa
Fe NM Airport SF
Airport
East
Apron
Re‐Const.
Ph.2 










1,000,000
 8
Santa
Fe NM Airport SF
Airport
East
Apron
Re‐Const.
Ph.1 










1,500,000
 10
Santa
Fe NM CDBG Airport
Road
Re‐Development 










2,000,000

Santa
Fe NM CDBG Development
of
a
regional
high‐speed
broad
band
loop
for
the
promo3ng
and
developing
economic

development
and
workforce
development
projects
in
the
Santa
Fe
Region 










8,000,000
 250
Santa
Fe NM Housing Development
of
addi3onal
Senior
Housing,
for
very
low
income
individuals 










1,500,000
 15
Santa
Fe NM Housing Construc3on
of
addi3onal
units
for
affordable
housing 










2,000,000
 20
Santa
Fe NM Housing Construc3on
of
the
Hopwell
Community
Center 












650,000
 36
Santa
Fe NM Streets/Roads Dowtown
SF
River
Bridge 












500,000
 10
Santa
Fe NM Streets/Roads Bishops
Lodge
Road
Urban
Project 










1,000,000
 15
Santa
Fe NM Streets/Roads City
Street
Rehabilita3on 










2,000,000
 20
Santa
Fe NM Streets/Roads Siler
Road
Extension 










2,000,000
 30
Santa
Fe NM Transit Transit
Center
Bay
Expansion 












300,000
 5
Santa
Fe NM Transit Sf
Place
Transit
Center 












500,000
 7
Santa
Fe NM Transit Sf
Trails
Bus
Replacement
(10) 










4,000,000
 40
Santa
Fe NM Water Construc3on
of
two
stream
gages
on
the
upper
and
lower
Santa
Fe
River. 












200,000
 2
Santa
Fe NM Water Construc3on
of
3
water
delivery
systems
to
mi3gate
the
surface
water
impacts
of
ground
water
pumping
in
La

Cienaga
and
the
Rio
Resuque 










2,000,000
 4
Santa
Fe NM Water Rehabilita3on
of
Drinking
Water
Distribu3on
System,
including
replacment
of
water
mains,
metered
water

services
and
pressure
reducing
sta3ons. 










3,000,000
 10
Santa
Fe NM Water Upgrade
of
Water
Treatment
Effluent
Recycling
System 










4,000,000
 35
Santa
Fe NM Water Construc3on
of
a
drinking
water
treatment
plant,
5
pump
sta3ons
and
26
miles
of
piping. 










8,000,000
 225
Silver
City NM CDBG Crea3on
of
Economic
Developer
posi3on
to
service
en3re
county. 














60,000
 1
Silver
City NM CDBG Replace
surface
of
parking
lot,
county
owned
hospital
Gila
Regional
Medical
Center 












400,000
 7
Silver
City NM CDBG Purchase
historic
Silco
Theater,
Main
Street
economic
development 










1,100,000
 10
Silver
City NM CDBG Construc3on
of
new
Gospel
Mission
facility
for
homeless,
under
employed,
needy 










2,000,000
 18
Silver
City NM CDBG Addi3on
to
emergency
medical
services
(ambulance)
sta3on 












300,000
 20
Silver
City NM CDBG Construc3on
of
Industrial
facili3es
at
County
industrial
park. 










2,500,000
 30
Silver
City NM CDBG Mill
and
overlay
streets
Swan,
Silver,
12th. 












950,000
 30
Silver
City NM CDBG Replacement
of
water
lines
and
fire
hydrants,
valves
in
Chihuahua
Hill
Neighborhood.
Restore
streets. 












772,832
 30
Silver
City NM CDBG Construct
affordable
housing
subdivision 










3,000,000
 40
Silver
City NM CDBG Construc3on
of
office
complex
County
owned
hospital,
Gila
Regional
Medical
Center 










3,000,000
 40
Silver
City NM CDBG Health
Commons 










5,000,000
 40
Silver
City NM CDBG Expansion
of
recrea3on
fields
at
Ben
D.
Altamirano
Sports
Complex 










1,271,500
 45
Silver
City NM CDBG Construc3on
of
new
recrea3on
center 










6,000,000
 75
Silver
City NM CDBG Improvements
to
Lifle
Walnut
Rd. 










6,100,000
 80
Silver
City NM CDBG Construc3on
of
new
Town
Hall 








12,000,000
 120
Silver
City NM CDBG Extension
and
enhancement
of
water
system
to
3e
in
surrounding
communi3es
for
regional
water
system 










8,000,000
 120
Silver
City NM Energy Add
Solar
cells
and
equipment
to
water
pumps,
wastewater
systems. 










7,000,000
 15
Silver
City NM Public
Safety public
area
law
enforcement,
networked
camera
system 












150,000
 2
Silver
City NM Public
Safety Purchase
and
installa3on
of
mesh
network
for
law
enforcement
mobile
data
system 










1,200,000
 20
Silver
City NM Transit Purchase
of
buses
for
Regional
Transit
District
Servicing
Silver
City 












300,000
 5
Henderson NV CDBG CDBG
Streetlight
Pole
Replacement:
Infrastructure
improvements
that
can
include
improvements
to
storm

drains,
street
lights,
curbs,
sidewalks,
and
gufers
as
required. 












109,600
 8
Henderson NV CDBG Water
Street
Site
A
U3li3es
Reloca3on:
Water
and
sewer
main
reloca3on
for
Site
A
at
Water
Street
&
Victory. 












800,000
 15
Henderson NV CDBG Renova3ons
to
the
Valley
View
Recrea3on
Center‐Pa3o
shade
structure,
paint,
par33on
walls,
reloca3on
of

front
desk,
room
addi3on
and
flooring
replacement. 












400,000
 20
Henderson NV CDBG Renova3ons
to
the
Whitney
Ranch
Recrea3on
Center‐Pa3o
shade
structure,
paint,
par33on
walls,
reloca3on
of

front
desk,
room
addi3on
and
outdoor
covered
play
structure. 












425,000
 20
Henderson NV CDBG CDBG
Triangle
Area
Sidewalk
and
Handicap
Ramp
Improvements:
Infrastructure
improvements
that
can

include
improvements
to
storm
drains,
street
lights,
curbs,
sidewalks,
and
gufers
as
required. 










1,000,000
 25
Henderson NV CDBG Water
Street
Phase
3
and
North
Water
Street
–
Eastside
Connec3on
Project:
Roadway
improvements
from

Victory
to
Lake
Mead
including
streetscape
and
storm
drain. 










3,000,000
 40
Henderson NV CDBG Handicapped
and
Special
Needs
Sports
Complex,
located
in
the
Seven
Hills
Area,
to
benefit
the
special
needs

popula3on

throughout
the
valley. 








10,000,000
 150
Henderson NV Energy Solar
Photovoltain
Power
Genera3on
Units
‐
1
at
Downtown
Recrea3on
Center
and
1
at
Mul3genera3onal

Center 












800,327
 20
Henderson NV Energy Disinfec3on
By‐Product
Control‐Modify
the
exis3ng
filtra3on
facili3es,
install
granular
ac3vated
carbon
filter

media,
and
analyze
the
reduc3on
of
disinfec3on
by
products
at
the
COH
water
treatment
plant. 












550,000
 30
Henderson NV Energy Downs
5
Morrell
Park
Phase
2:
Provide
connec3vity
between
the
downtown
Henderson
popula3on
to
the

regional
trails
system
through
restora3on
of
the
exis3ng
Downs
5
Linear
Park
to
Boulder
Highway
along
Morrell

Park,
connect
to
the
downtown
school
sites, 










2,254,000
 30
Henderson NV Energy Renewable
Energy
Project‐Implement
renewable
energy
applica3on
that
will
provide
up
to
3
‐
4
MW
of
power

genera3on,
i.e.
crystalline
sun‐tracking
system
or
a
thin‐film
fixed
array
of
solar
panels. 








20,000,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Henderson NV Energy Hidden
Falls
Park:
Design
and
construc3on
of
a
18
acre
community
park
at
Horizon
Ridge
Parkway
and
Horizon

Drive. 










7,365,000
 40
Henderson NV Energy Reunion
Park:
Design
and
construc3on
of
a
17
acre
neighborhood
park
located
in
the
Champion
Village

subdivision
at
Stephanie
Street
adjacent
to
the
I‐215 










9,327,450
 40
Henderson NV Energy Heritage
Park
Campus
Phase
1:
Develop
a
60
acre
mul3‐use
sports
field
complex
and
standard
park
ameni3es.

Concept
plan
is
broken
into
four
(4)
phases
totaling
$51,701,288.26. 








20,000,000
 150
Henderson NV Housing Palo
Verde
–
roofs,
air
condi3oners 












240,000
 5
Henderson NV Housing Espinosa
–
air
condi3oner,
water
valves,
sidewalks 












560,000
 10
Henderson NV Housing Landsman
Gardens
–
roofs,
water
valves,
paint,
siding,
stucco 












490,000
 10
Henderson NV Housing Hampton
Courts
(3
buildings)
–
roofs,
siding,
stucco,
paint,
air
condi3oners,
main
water
valves,
parking
lot

ligh3ng,
and
sidewalks. 










3,070,000
 20
Henderson NV Public
Safety Radio
Tower
Repeater
Site
Project
‐
this
project
will
facilitate
communica3ons
with
a
sec3on
of
our
popula3on

that
currently
has
limited
recep3on.
The
repeater
is
needed
to
protect
public
health
and
safety
in
cases
of
an

imminent
threat
of
flood,
fire 










1,200,000
 5
Henderson NV Public
Safety Deten3on
Center
Control
Room
Equipment
Enhancement
Project
–
replace
the
exis3ng
security
control
room

equipment
in
the
Deten3on
Center
with
a
new
super
display
touch
screen
control
sta3on
in
the
Central

Control,
and
three
Dual
LCD
touch
screen
contro 










1,200,000
 8
Henderson NV Public
Safety Court
Security
‐
Purchase
and
install
e‐security
enhancement
sobware
for
more
efficient
court
administra3on.


This
would
include
Municipal
Court
E‐Access,
CourtView
upgrades,
court
laptops,
video
security,
security
locks

and
x‐ray
check
point
machine. 












320,000
 9
Henderson NV Public
Safety Field
Technology
Project
‐
replacement
of
all
exis3ng
Laptops
and
vehicle
mounts
in
all
patrol
vehicles.

Exis3ng

technology
is
over
5
years
old
and
does
not
provide
the
capabili3es
to
handle
new
and
updated
technology.

Laptops
need
to
be
kept
current 










2,480,000
 10
Henderson NV Public
Safety Radio
Communica3ons
Project
–
enhance
radio
communica3ons
with
latest
technology.

Exis3ng
technology
is

outdated
and
not
Project
25
(digital)
compliant,
which
will
be
necessary
for
future
use.
Enhanced
communica3on
allows
for
officers
to
communicate 










2,500,000
 10
Henderson NV Public
Safety Communica3on
Center
Improvement
(Dispatch)
Project
–
New
redundant
servers,
radio
consoles
and
reader

boards
to
enhance
the
exis3ng
capabili3es
of
our
Communica3on
Center
not
only
handles
police,
but
all
fire

calls
as
well.

This
project
will
provide 










1,467,000
 20
Henderson NV Public
Safety El
Dorado
Valley
Regional
Training
Center
‐
Infrastructure
for
a
regional
training
center
on
dedicated
BLM
land

that
must
be
used
for
a
regional
purpose.

The
regional
training
center
will
provide
local
law
enforcement

agencies
that
are
facing
constraints 










2,000,000
 30
Henderson NV Streets/Roads 2008/09
Street
R&R
Program:
Yearly
street
maintenance
contract
funded
by
gas
tax
revenues
that
consists
of

removal
and
replacement
of
asphalt
on
exis3ng
residen3al
roadways
with
a
PCI
of
less
than
10.
The
08/09

program
will
include
Annie
Oakley
and
all 










3,500,000
 12
Henderson NV Streets/Roads 2008/09
Arterial
roadway
resurfacing
and
removal
&
replacement
Program.

Arterials
qualified
for
3R
program

must
have
PCI
of
20
or
less
and
may
include
but
are
not
limited
to:
American
Pacific,
US95
to
Arroyo
Grande;

Eastgate,
Warm
Springs
to
Galleria;
Gr 










4,000,000
 30
Henderson NV Streets/Roads Galleria
Drive
‐
Boulder
Highway
to
Pabco
Road:
Purchase
right‐of‐way
along
Saddle
Associa3on
for

construc3on
of
full
off‐sites
along
City
owned
parcels
and
RTC
sec3on
where
applicable
between
Ward
and

Pabco
with
traffic
and
drainage
appurtenances
as
r 










4,500,000
 30
Henderson NV Streets/Roads Burkholder:
Lake
Mead
to
Racetrack:
Widen
to
4
travel
lanes
with
drainage
and
traffic
improvements. 










6,000,000
 50
Henderson NV Streets/Roads Lake
Mead
Pkwy
Improvements
‐
Boulder
Hwy
to
Lake
Las
Vegas
Pkwy:
Widen
exis3ng
roadway
to
six
lanes,

grade
separated
intersec3on
at
Lake
Las
Vegas
Parkway,
and
enhancements. 








30,000,000
 50
Henderson NV Streets/Roads Major
Avenue
‐
Van
Wagenen
to
Warm
Springs:
Reconstruc3on
with
drainage
and
traffic
improvements. 










6,000,000
 50
Henderson NV Transit Construct
separate
established
transit
lanes
to
provide
addi3onal
capacity
for
Bus
Rapid
Transit
along
Boulder

Highway.

Partner
with
RTC
to
increase
transit
service
within
Clark
County. 






100,000,000
 200
Henderson NV Water Misc
PRV
&
Pressure
Zone
Improvements
‐
Phase
I
–
Replaces
PRV’s
8
and
18
with
new
PRV’s
106
and
105,

which
includes
installa3on
of
8‐inch
and
12‐inch
water
main
and
conversion
of
exis3ng
pressure
zones. 










1,507,000
 25
Henderson NV Water Wigwam/US95
24‐inch
2120
Main
&
Prv.
‐
Installa3on
of
approximately
1,600
lineal
feet
of
20‐inch
main
from

the
end
of
W‐225
(30‐inch
2120)
under
U.S.
95
to
Eastgate
Road
to
supply
the
2007
PRV;
and
installa3on
of

approximately
2,700
lineal
feet
of
16‐in 










1,734,700
 25
Henderson NV Water 3‐Inch
and
Larger
Water
Meter
&
Vault
Maintenance
Program
–
Repair/replacement
of
approximately
49
large

meters
that
fail
or
are
mechanically
obsolete
and
do
not
func3on
within
AWWA
performance
standards
for

large
meters.
 










3,449,600
 30
Henderson NV Water Landwell
2200
Sewer
Interceptor
–
Construc3on
of
approximately
3,300
lineal
feet
of
27‐inch
sewer
and

replace
11,300
lineal
feet
of
21‐inch
with
new
27‐inch
line
north
of
Lake
Mead
Drive/Warm
Springs
Road
to

Pabco
Road
and
south
of
Athens/Galleria. 










4,086,884
 30
Henderson NV Water Pifman
Wash
Sanitary
Sewer
Reloca3on/Valle
Verde
to
Sandwedge
Channel
–
Reloca3on
of
approximately

1,650
lineal
feet
of
exis3ng
21‐inch
sanitary
sewer
and
provide
a
maintenance
access
road
(approximately

2,200
lineal
feet)
for
the
sewer
within
the
Pit 










2,585,000
 40
Las
Vegas NV CDBG Ethel
Pearson
Park
Improvements 












800,000
 4
Las
Vegas NV CDBG Huntridge
Neighborhood
Street
Lights
and
Sidewalks
‐
Construct
street
lights
and
sidewalks
were
none
exist

within
this
older
residen3al
subdivision. 












800,000
 4
Las
Vegas NV CDBG Doolifle
Park
Renova3ons
Phase
I 










2,000,000
 10
Las
Vegas NV CDBG Las
Vegas
Boulevard
Neon
Signs
Project
–
Construct
neon
signage
within
Las
Vegas
Blvd
in
Downtown
Las
Vegas











2,000,000
 10
Las
Vegas NV CDBG Westside
School
Remodel‐
Renova3on 










2,500,000
 12
Las
Vegas NV CDBG Hoover
Avenue
&
First
Street
Streetscape
Project
–
Construct
hardscape
and
landscaping
enhancements
within

Downtown
Las
Vegas
according
to
Centennial
Standards. 










4,000,000
 20
Las
Vegas NV CDBG Stupak
Park
Reconstruc3on
–
Reconstruct
an
exis3ng
park
within
the
Downtown
Urban
core. 










4,000,000
 20
Las
Vegas NV CDBG Rotary
Park
Rehabilita3on 










4,700,000
 24
Las
Vegas NV CDBG Project
Clear
Skies
Downtown
Aerial
U3lity
Undergrounding 








30,000,000
 150
Las
Vegas NV CDBG Las
Vegas
Historic
Post
Office
Museum
Rehabilita3on 








55,000,000
 275
Las
Vegas NV CDBG Las
Vegas
City
Hall
and
Parking
Garage
–
Construct
a
new
City
Hall
and
Parking
Garage
within
Downtown
Las

Vegas. 






167,000,000
 835
Las
Vegas NV CDBG Las
Vegas
Performing
Arts
Center
–
Construct
a
new
Performing
Arts
Center
within
the
City’s
Union
Park

Development. 






375,000,000
 1875
City State Program Project
Descrip3on Funding
Required Jobs
Las
Vegas NV Energy Digester
gas
scrubbers
–
Water
Pollu3on
Control
Facility 










2,000,000
 5
Las
Vegas NV Energy Fuel
Cell
–
Water
Pollu3on
Control
Facility 








18,500,000
 5
Las
Vegas NV Energy 3
megawaf
solar
p.v.
at
Water
Pollu3on
Control
Facility 








22,000,000
 15
Las
Vegas NV Energy Rebates
for
Green
Building
Program 










1,000,000
 25
Las
Vegas NV Energy 4
megawaf
Solar
p.v.
on
public
buildings
(20
projects
across
the
city
that
are
all
scoped
and
ready
to
build
as

funding
becomes
available) 








29,400,000
 30
Las
Vegas NV Energy Public
Facility
Energy
Conserva3on
Program 










5,000,000
 30
Las
Vegas NV Energy Rebates
for
Home
Performance
Energy/Sustainability
Audit
and
Retrofit
program 










1,300,000
 250
Las
Vegas NV Public
Safety Fire
Sta3on
#42
Backup
Generator 












350,000
 2
Las
Vegas NV Public
Safety Las
Vegas
Fire
Training
Burn
Tower
Rehabilita3on 










1,500,000
 8
Las
Vegas NV Streets/Roads
Las
Vegas NV Streets/Roads Charleston
Boulevard
Sidewalk
Replacement
‐
Replace
sidewalks
along
Charleston
Boulevard
to
meet
current

ADA
requirements. 












250,000
 2
Las
Vegas NV Streets/Roads Durango
Drive
Overlay
–
Cheyenne
Avenue
to
Alexander
Road 












600,000
 3
Las
Vegas NV Streets/Roads Alexander
Road
Overlay
–
Cimarron
Road
to
US‐95 












700,000
 3.5
Las
Vegas NV Streets/Roads Maryland
Parkway
and
13th
Street
Overlays
‐
Sahara
Avenue
to
Stewart
Avenue 












920,000
 4.5
Las
Vegas NV Streets/Roads Lamb
Boulevard
&
Pecos
Road
Bus
Turnouts
–
Construct
new
bus
turnouts
on
Lamb
Blvd
and
Pecos
Road
to

relieve
traffic
conges3on. 










1,000,000
 5
Las
Vegas NV Streets/Roads Lamb
Boulevard
Overlay
‐
Charleston
Boulevard
to
Owens
Avenue 












980,000
 5
Las
Vegas NV Streets/Roads Rancho
Park
Neighborhood
Roadway
Rehabilita3on
–
Reconstruct
pavement
in
the
Rancho
Park
Neighborhood

that
has
reach
the
end
of
the
service
life. 










1,000,000
 5
Las
Vegas NV Streets/Roads Rainbow
Boulevard
Overlay
‐
Smoke
Ranch
Road
to
Lone
Mountain
Road 










2,000,000
 10
Las
Vegas NV Streets/Roads Bonanza
Road
Overlay
‐
Las
Vegas
Boulevard
to
Nellis
Boulevard 










2,100,000
 10.5
Las
Vegas NV Streets/Roads Charleston
Boulevard
ITS
–
Construct
Intelligent
Transporta3on
System
interconnect
on
Charleston
Boulevard

to
facilitate
traffic
flow
during
peak
travel
3mes. 










3,000,000
 15
Las
Vegas NV Streets/Roads City
of
Las
Vegas
Traffic
Package
No.
7
–
Construct
new
traffic
signals
and
intersec3on
improvements
at

Bonanza/Tonopah
and
Washington/Comstock. 










3,500,000
 18
Las
Vegas NV Streets/Roads Cliff
Shadows
Parkway
Improvements
–
Cheyenne
Avenue
to
Lone
Mountain
Road 










3,800,000
 19
Las
Vegas NV Streets/Roads Clark
County
215
(CC215)
Beltway
Mul3‐Use
Trail
–
Construct
a
new
transporta3on
trail
system
within
the

CC215
right‐of‐way
in
the
west
area
of
Las
Vegas. 










4,000,000
 20
Las
Vegas NV Streets/Roads Las
Vegas
Wash
Trail
Phase
I
–
Construct
a
new
transporta3on
trail
within
the
Las
Vegas
Wash
right‐of‐way
that

will
serve
as
a
regional
trail
throughout
Clark
County. 










4,000,000
 20
Las
Vegas NV Streets/Roads Stewart
Avenue
Rehabilita3on
Phase
II
–
Las
Vegas
Blvd
to
Main
Street 










3,980,000
 20
Las
Vegas NV Streets/Roads Huntridge
Phase
6
Neighborhood
Roadway
Rehabilita3on
‐

Reconstruct
pavement
in
the
Huntridge
Phase
6

Neighborhood
that
has
reach
the
end
of
the
service
life. 










4,800,000
 24
Las
Vegas NV Streets/Roads Decatur
Blvd
Phase
I
–
US95
to
Faircenter
Parkway 










7,300,000
 36.5
Las
Vegas NV Streets/Roads Vegas
Drive
Improvements
–
Michael
Way
to
Rancho
Drive 








13,600,000
 68
Las
Vegas NV Streets/Roads Grand
Teton
Overpass
at
US95 








16,200,000
 81
Las
Vegas NV Streets/Roads Horse
Interchange
–
Construct
a
new
service
interchange
at
Horse
Drive
and
US95
to
service
the
rapidly

developing
Northwest
Las
Vegas 








32,980,000
 165
Las
Vegas NV Streets/Roads Union
Park
Infrastructure
–
Roadways,
drainage,
u3lity
infrastructure
within
the
City
owned
redevelopment

area. 








60,000,000
 300
Las
Vegas NV Transit Five
miles
of
sidewalks
and
streetscape
ameni3es
downtown
adjacent
to
Bus
Rapid
Transit
lines 










5,000,000
 28
Las
Vegas NV Transit ACE
buses
for
Bus
Rapid
Transit
lines 








25,000,000
 30
Las
Vegas NV Water Rainbow
Boulevard
Storm
Drain
(Las
Vegas
Wash
–
Rainbow)
–
Regional
flood
control
facility
to
provide

protec3on
for
Northwest
Las
Vegas. 








16,500,000
 83
Las
Vegas NV Water North
and
South
Environmental
Enhancement
Areas
in
Floyd
Lamb
Park
–
New
deten3on
basins
in
Floyd
Lamb

park
to
protect
Northwest
Las
Vegas,
basin
are
beginning
designed
for
combined
recrea3onal
use
and
preserve

environmental
resources. 








30,000,000
 150
Las
Vegas NV Water Elkhorn
Storm
Drain
(Las
Vegas
Wash
Middle
Branch
–
Decatur)
–
Regional
flood
control
facility
to
provide

protec3on
for
Northwest
Las
Vegas. 








45,000,000
 225
Mesquite NV Water Wastewater
Treatment
Facility
Expansion 








22,500,000
 120
Reno NV CDBG South
Virginia
Retail
Development
‐
invest
in
the
businesses
along
South
Virginia,
a
main
a
in
the
form
of

facade
improvements
and
small
business
loans 










3,000,000
 86
Reno NV CDBG ADA
Upgrades
in
City
right‐of‐way
for
non‐compliant
wheelchair
ramps
and
sidewalk
sec3ons 








25,000,000
 715
Reno NV Energy Parking
gallery
solar
project 












277,000
 8
Reno NV Energy Downtown
Events
Center
Solar
project 










3,300,000
 94
Reno NV Housing St.
Vincent's
Residence
‐
demoli3on
of
a
substandard
complex
to
be
replaced
with
a
28
single‐room
occupancy

units
affordable
to
individuals
with
incomes
below
50%
of
the
area
median
income.
While
6
units
will
be

suppor3ve,
transi3onal
housing
for
those 












500,000
 14
Reno NV Housing Sierra
Manor
‐
an
acquis3on
and
rehabilita3on
project
intended
to
provide
a
higher
quality
living
environment

for
very
low
income
seniors
while
con3nuing
to
provide
truly
affordable
housing 










1,000,000
 29
Reno NV Housing Autumn
Village
‐
a
43
unit
affordable
housing
project
serving
families
at
or
below
50%
of
the
area
median

income
including
9
units
for
households
currently
experiencing
homelessness 










1,500,000
 43
Reno NV Housing Homeowner
rehabilita3on
‐
supplement
current
area
programs
to
assist
low
income
homeowners
make

necessary
health
and
safety
repairs
and
energy
efficiency
upgrades
to
their
homes. 










1,500,000
 43
Reno NV Streets/Roads Traffic
calming
measures
to
increase
pedestrian
and
bicycle
safety
in
areas
near
neighborhood
centers 












300,000
 9
Reno NV Streets/Roads Rehabilita3on

&
preventa3ve
maintenance
of
surface
streets
throughout
city 








18,500,000
 528
Reno NV Streets/Roads Install
new
and
upgrade
exis3ng
traffic
signals
to
energy
efficient
technology;
upgrade
video
detec3on
system

for
traffic
signals;
replace
traffic
signal
controllers
with
smart
technology
to
lower
vehicle
idling
3me
and

reduce
travel
3me,
thereby
redu 








19,375,000
 551
Reno NV Water Replacement
of
asphalt
pavement
within
plant
site 












515,000
 15
Reno NV Water Rehabilita3on
of
Digester
#4
Cover 












600,000
 17
Reno NV Water Removal
and
replacement
of
aging
electrical
transformers 












850,000
 24
Reno NV Water Replace
aging
electrical
switchgear
‐
replace
main
electrical
switchgear 












850,000
 24
City State Program Project
Descrip3on Funding
Required Jobs
Reno NV Water Removal
and
replacement
of
exis3ng
maintenance‐intensive
sludge
cake
pumps
in
the
dewatering
building 










1,120,600
 32
Reno NV Water Overlay
of
Clean
Water
Way
from
TMWRF
to
McCarran
Ave 










1,250,000
 36
Reno NV Water Phase
1
‐
extend
TMWRF
reuse
distribu3on
system 










1,715,000
 49
Reno NV Water Storm
drain
&
other
flood
control
projects 










3,000,000
 86
Reno NV Water Lakeside
trunk
sewer
replacement
‐
re‐align
&
replace
aging
sewer 










3,100,000
 89
Reno NV Water 2010
Unit
2
Sewer
Replacement
small
diameter
sewer
pipe
replacement 










3,200,000
 91
Reno NV Water Lawton‐Verdi
Interceptor
phase
V
‐
river
crossing
and
interceptor
extension 










4,025,000
 115
Reno NV Water North
Virginia
Phase
1B
Interceptor
replacement
and
upsize 










4,200,000
 120
Reno NV Water 2009
Sanitary
Sewer
CIPP
Lining
Project
‐
large
diameter
sewer
pipe
rehabilita3on 










4,350,000
 124
Reno NV Water Flow
equaliza3on
basin
&
reuse
pumping
sta3on
upgrades 










5,500,000
 157
Sparks NV CDBG Regional
Trail
Rehabilita3on
Project
Phase
2:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt

regional
trails
that
will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. 














44,000
 2
Sparks NV CDBG Regional
Trail
Project
Phase
1:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that

will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. 












232,000
 8
Sparks NV CDBG Regional
Trail
Rehabilita3on
Project
Phase
1:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt

regional
trails
that
will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. 












232,000
 8
Sparks NV CDBG Regional
Trail
Project
Phase
2:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that

will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. 












411,295
 14
Sparks NV CDBG Glendale
Park
project 












650,000
 22
Sparks NV CDBG Wedekind
Park
project 












750,000
 26
Sparks NV CDBG Wild
Creek
park
project 












770,000
 27
Sparks NV CDBG ADA
ramp
replacement
and
installa3on
project 












860,000
 30
Sparks NV CDBG Regional
Trail
Project
Phase
5:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that

will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. 












860,720
 30
Sparks NV CDBG Regional
Trail
Project
Phase
4:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that

will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. 










1,019,640
 35
Sparks NV CDBG Regional
Trail
Project
Phase
3:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that

will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. 










1,380,705
 48
Sparks NV CDBG Traffic
signal
intersec3on
ADA
&
pedestrian
crossing
project 










1,570,000
 54
Sparks NV CDBG Golden
Eagle
Park
Improvements:
Improvements
include
restroom
facili3es
and
concession
stands
in
our
new

$30M
astro
turf
baseball,
sobball,
football,
volleyball
and
lifle
league
fields. 










1,915,000
 67
Sparks NV CDBG Larry
D.
Johnson
Community
Center
Phase
II
&
III:
funding
to
complete
the
Community
Center
including
ESL

language
classrooms
and
a
gym. 








12,000,000
 343
Sparks NV Energy Larry
D.
Johnson
Community
Center:
Installa3on
of
solar
panels 












500,000
 9
Sparks NV Energy Traffic
signal
LED
project 










3,695,000
 13
Sparks NV Energy Traffic
signal
interse3on
safety
ligh3ng
LED
project 












440,000
 15
Sparks NV Public
Safety Surveillance
equipment:
night
vision
goggles,
bait
tracker,
wire
box,
encrypted
radios,
and
pen
link 














45,000
 4
Sparks NV Public
Safety Police
Department
parking
lot
expansion 












132,000
 5
Sparks NV Public
Safety Technology
to
include
archive
writer
and
plate
scan
for
5
patrol
vehicles 












200,000
 6
Sparks NV Public
Safety 6
undercover
vehicles 












180,000
 8
Sparks NV Public
Safety Armored
vehicle
(BEAR)
for
the
SWAT
team 












420,000
 8
Sparks NV Public
Safety Shoo3ng
house
for
live
fire:
will
accomodate
all
of
the
department
and
SWAT
team. 












600,000
 8
Sparks NV Public
Safety City
Facili3es
voice
and
data
communica3on
upgrade
project 












250,000
 9
Sparks NV Public
Safety Awning
for
patrol
vehicles
in
secure
parking
lot 












300,000
 10
Sparks NV Public
Safety IT
upgrade:
replace
equipment
computer
server
room,
crime
view
phase
II
and
III,
report
wri3ng
upgrade,

audio
and
video
in
training
rooms,
and
in‐house
security
system 












440,000
 10
Sparks NV Public
Safety 6
patrol
vehicles 












318,000
 12
Sparks NV Public
Safety Emergency
ac3on
equipment
for
all
patrol
officers
to
include:
rifles
and
rifle
kits,
ballis3c
helmets
and
vests,

breaching
kits,
and
breaching
shotguns 












356,000
 12
Sparks NV Public
Safety Replace
all
department
handi‐talkies
(161) 












470,000
 12
Sparks NV Public
Safety Re‐wire
all
6
dispatch
consoles
to
be
compa3ble
with
the
next
genera3on
of
technology 












600,000
 20
Sparks NV Public
Safety Police
Department
outbuilding
Expansion 












750,000
 21
Sparks NV Public
Safety Traffic
signal
bafery
back
up
project 












693,000
 24
Sparks NV Public
Safety New
records
management
system
and
CAD:
allow
all
local
agencies
to
share
informa3on 










2,000,000
 30
Sparks NV Streets/Roads El
Rancho
Dr,
Greenbrae
Way,
Sullivan
Lane,
and
sidewalk
accessibility/safety
improvements 












108,356
 4
Sparks NV Streets/Roads Golden
Eagle
Traffic
Signal 












290,000
 10
Sparks NV Streets/Roads Downtown
neighborhood
street
and
concrete
rehabilita3on 










1,165,000
 40
Sparks NV Streets/Roads McCarran
Loop
neighborhood
street
and
concrete
rehabilita3on 










1,165,000
 40
Sparks NV Streets/Roads Southwest
neighborhood
street
and
concrete
rehabilita3on 










1,165,000
 40
Sparks NV Streets/Roads Prater
Way
phase
3
streetscape
project 










1,295,000
 43
Sparks NV Streets/Roads Victorian
Square
Phase
2
public
improvements 










2,156,106
 75
Sparks NV Streets/Roads York
Way
Street
&
Concrete
Rehablita3on 










2,466,660
 86
Sparks NV Streets/Roads Industrial
Area
Street
&
Concrete
Rehabilita3on 










3,708,870
 130
Sparks NV Streets/Roads Prater
Way
Street
&
Concrete
Rehabilita3on 










3,860,320
 135
Sparks NV Streets/Roads Neighborhood
St
&
Concrete
Rehabilita3on 










9,685,000
 339
Sparks NV Streets/Roads Vista
Blvd
Widening
Project 








16,187,000
 566
Sparks NV Water Wingfield
Springs
sanitary
sewer
maintenance
and
effluent
upgrade
project 












619,035
 18
Sparks NV Water Los
Altos
Parkway
effluent
upgrade
and
landscaping
project 










2,097,000
 60
Sparks NV Water Orr
Ditch
lining
project 










2,126,250
 61
Sparks NV Water Spanish
Spring
Interceptor
Phase
4 










4,660,000
 84
Sparks NV Water Prater
Way
Storm
Drain
Rehabilita3on 










7,679,205
 138
Sparks NV Water Spanish
Spring
Interceptor
Phase
3 










9,435,000
 170
City State Program Project
Descrip3on Funding
Required Jobs
Sparks NV Water Stanford
Way
Storm
Drain
Interceptor 








10,025,000
 180
Albany NY CDBG St.
Joseph's
Academy
Ar3st's
Lob
Conversion
‐
conversion
of
an
exis3ng
vacant
school
into
ar3sts'
lob
housing

and
community
space.

The
school
is
located
in
an
distressed
neighborhood
that
is
currently
undergoing

reinvestment. 










2,000,000
 22
Albany NY CDBG C‐1
Neighborhood
Commercial
District
Facade
Program
‐
Program
would
con3nue
funding
for
successful

ini3a3ve
that
provides
matching
funds
to
support
small
scale
locally
owned
neighborhood
businesses

throughout
the
City's
commercial
corridors. 










3,000,000
 25
Albany NY CDBG Vacant
Building
Targeted
Stabiliza3on
Program
‐

This
program
will
target
one
third
of
the
vacant
and

abandoned
proper3es
in
the
City
of
Albany
(300
buildings),
with
the
intent
of
acquiring
the
property
where

necessary
or
designa3ng
a
receiver
to
addre 










4,000,000
 25
Albany NY CDBG Hoffman
Park
‐
Transforma3on
of
exis3ng
parkland
into
state
of
the
art
athle3c
facili3es
for
collegiate
and

public
use,
including:
baseball,
sobball,
and
soccer
fields. 










5,000,000
 35
Albany NY CDBG Corning
Preserve
Phase
2
‐Amphitheater
and
Fes3val
Space
‐
The
comple3on
of
this
project
will
provide
a

significantly
expanded
preserve
that
provides
extensive
community
and
recrea3onal
space
that
enhances
the

environmental
quality
of
the
Hudson
River
 










4,500,000
 40
Albany NY CDBG Downtown
Residen3al
Construc3on
&
Adap3ve
Re‐use
Program
‐
Program
funding
would
enable
construc3on

of
new
or
rehabilita3on
of
older,
underu3lized
buildings
for
conversion
to
downtown
quality
housing.

Downtown
has
800,000
square
feet
of
vacant
or
un 










5,000,000
 50
Albany NY CDBG Harriman
Campus
‐
21st
Century
Redevelopment
Sector‐
site
acquisi3on,
infrastructure
upgrade
and
site

development. 








19,000,000
 75
Albany NY CDBG Strategic
Neighborhood
Redevelopment
Projects
‐
acquisi3on,
demoli3on,
rehabilita3on,
and
infill

development
in
districts
that
are
presently
blighted
with
vacant
and
underu3lized
structures. 








20,000,000
 100
Albany NY Energy Municipal
Fleet
Diesel
Retrofits
&
Upgrade 












750,000
 10
Albany NY Energy Municipal
Buidings
Alterna3ve
Energy
Retrofits
‐
Program
will
install
alterna3ve
energy
retorifits
to
exis3ng

municipal
buildings 










2,000,000
 20
Albany NY Energy Vacant
Building
Green
Rehab
Grant
Program
‐
Program
will
provide
grants
to
owners
who
purchase
vacant

buildings
in
targeted
areas
and
rehab
them
to
green
building
standards.
Buildings
mus
be
owner‐occupied
for
a

set
period
of
3me. 










1,500,000
 20
Albany NY Public
Safety Public
Safety
Interoperable
Data
Communica3ons
‐
APD
received
a
$3.5m
COPS
Technology
grant
to
provide

law
enforcement
agencies
in
Albany,
Rensselaer,
and
Schenectady
coun3es
with
integrated
Records

Management
Systems.

The
project
is
under
way,
and
add 












250,000
 0
Albany NY Public
Safety Violent
Crime
Suppression
Ini3a3ve
‐
APD
received
a
$330,000.00
Byrne
grant,
which
provided
wireless
access

points
and
in‐car
cameras
for
use
in
areas
targeted
for
high
incidence
of
firearm
related
crime.

The
grant
also

funded
special
details
of
office 












300,000
 0
Albany NY Public
Safety Wireless
access
to
underserved
popula3ons
ini3a3ve‐
the
city
has
partnered
with
a
local
wireless
internet

provider
to
install
access
points
into
areas
of
the
city
in
which
the
populous
has
a
diminished
ability
to
gain

access
to
internet
services
for
em 










1,000,000
 0
Albany NY Streets/Roads State
Street
Rehabilita3on 










2,500,000
 29
Albany NY Transit Port
of
Albany
wharf
replacement
and
stabiliza3on
and
rail
expansion
project
‐
Funding
to
completely
renovate

the
dock
and
wharf
at
the
Albany
Port
District
Commission
would
enable
the
facility
to
con3nue
to
be
a

mari3me
hub
for
the
Northeastern
por3o 










8,800,000
 15
Albany NY Water Regulator
Rehabilita3on
Project 














30,000
 3
Albany NY Water West
Lawrence
Stormwater
Storage














115,000
 8
Albany NY Water Academy
Area
Storm
Sewer
Extension 












150,000
 9
Albany NY Water Allen
Street
Sewer
Slip
Lining
Project 














90,000
 9
Albany NY Water Hansen
Avenue
Storm
Sewer
Project 












200,000
 9
Albany NY Water Kent
Street
Sewer
Project 












160,000
 9
Albany NY Water Prospect
Street
Storm
Sewer
Project 














60,000
 9
Albany NY Water Rose
Court/Dartmouth
Deten3on
Basins 












125,000
 9
Albany NY Water Ryckman
Avenue
Storm
Sewer
Project 












130,000
 9
Albany NY Water Tampa
Avenue
Storm
Sewer
Project 












120,000
 9
Albany NY Water Woodville
Sewer
Project 














27,000
 9
Albany NY Water Loudonville
Reservoir
LT2ESWTR 












950,000
 14
Albany NY Water Delaware
Avenue
Sewer
Replacement
and
Relining 










1,075,000
 18
Albany NY Water Melrose
Area
Stormwater
Recharge
Basins 












730,000
 27
Binghamton NY CDBG City
Hall
‐
Plumbing
improvements
including
ADA
compliance
projects. 












110,000
 4
Binghamton NY CDBG City
Hall
HVAC
improvements,
including
a
new
energy
effficient
cooling
tower,
pumps,
and
controls. 












120,000
 5
Binghamton NY CDBG First
Ward
Senior
Center
‐
Renova3on
‐
including
new
energy
efficient
HVAC
System. 












170,000
 5
Binghamton NY CDBG Lloyd
Greenman
Senior
Center‐
Renova3on
including
new
energy
efficient
HVAC
System. 












195,000
 6
Binghamton NY CDBG Sidewalk
and
Curb
replacement
in
blighted
neighborhoods. 












225,000
 6
Binghamton NY CDBG City
Hall
Elevators
renova3on.
The
Elevators
are
37
years
old
and
have
not
been
upgraded
to
be
ADA
compliant

or
energy
efficient. 












650,000
 8
Binghamton NY CDBG Columbus
Park
renova3on‐
Upgrades
to
Bathhouse
to
make
ADA
compliant
and
building
improvements

including
plumbing
and
electrical
upgrades‐new
fence
and
bleachers
for
Lifle
League
Field.
Fountain
re‐hab. 












185,000
 11
Binghamton NY CDBG Sherri‐Lindsey
Park
Pool
House
renova3on
‐
to
install
a
HotWater
System
for
Showers
‐
bring
building
into
ADA

compliance‐
put
a
roof
on
the
building 












170,000
 12
Binghamton NY Streets/Roads High
Mast
Street
Ligh3ng
‐
to
improve
safety
through
increased
road
visibillity
and
poles
being
placed
further

from
the
driving
lanes
where
poles
are
oben
hit.
Maintenance
is
also
performed
safer
and
less
frequently.

Improvement
of
energy
efficiency
is
 












360,000
 8
Binghamton NY Streets/Roads Mill
Street
(Vestal
to
Conklin)
4"
mill
and
pave. 














63,044
 8
Binghamton NY Streets/Roads Eldredge
Street
(Water
to
Chenango)
4"
mill
and
pave. 












111,552
 10
Binghamton NY Streets/Roads South
Washington
Street
(Corbef
to
Morgan)
4"
mill
and
pave. 












107,819
 10
Binghamton NY Streets/Roads Frederick
Street
(Chenango
to
Brandywine)
4"
mill
and
pave
plus
curb
and
sidewalk
replacement
as
needed. 












250,310
 12
City State Program Project
Descrip3on Funding
Required Jobs
Binghamton NY Streets/Roads Oak
Street
(Main
to
Leroy)
4"
mill
and
pave
plus
addi3onal
catchbasins. 












162,364
 12
Binghamton NY Streets/Roads Mary
Street
(
Morgan
to
James)
4"
mill
and
pave,
new
catch
basins,
new
curb
and
sidewalk
as
needed. 












320,000
 14
Binghamton NY Streets/Roads Prospect
Street
(Front
to
City
Line)
4"
mill
and
pave. 












415,341
 14
Binghamton NY Streets/Roads State
Street
(Hawley
to
Lewis)
4"
mill
and
pave,
curb
and
sidewalk
replacement
as
needed. 












359,691
 14
Binghamton NY Streets/Roads Henry
Street
(Brandywine
to
Water)
4"
mill
and
pave
plus
new
curb
and
sidewalk
as
needed
and
trees
where
appropriate. 












453,884
 16
Binghamton NY Streets/Roads Park
Ave
(vestal
to
Morgan)
4"
mill
and
pave
plus
sidewalk
and
curb
replacement
as
needed. 












662,688
 16
Binghamton NY Streets/Roads South
Washington
Street
Bridge
Pain3ng
‐
Rehabilitate
and
Restore
a
Historic
Steel
Truss
Bridge.
This
is
a
highly

used
Pedestrian
Bridge. 












525,000
 16
Binghamton NY Streets/Roads Main
Street
rehab‐
4"
mill
and
pave
with
sidewalk
and
curb
replacement
as
needed. 










1,155,921
 20
Binghamton NY Streets/Roads Glenwood
Avenue
(Main
to
Prospect)
‐
4"
Mill
and
Pave,
with
new
curb
and
sidewalk. 












533,650
 22
Binghamton NY Streets/Roads Hawley
Street
(State
to
Court)
4"
Mill
and
Pave,
with
new
curb
and
sidewalks.
Will
improve
a
highly
visible

block
in
the
Downtown
Shopping
District. 












224,923
 23
Binghamton NY Streets/Roads Robinson
Street
(Chenango
to
Fairview)
‐
4"
Mill
and
Pave
with
new
curb
and
sidewalk
improvements. 










1,273,668
 24
Binghamton NY Water Large
Water
Meter
replacement

and
pit
upgrades
with
the
addi3on
of
Telemetry
‐
The
opera3ons
become

greener.
New
Back‐flow
preventors
‐
will
improve
the
Water
quality. 












360,000
 8
Binghamton NY Water Park
Channel
Floor
replacement‐
The
concrete
channel
was
built
by
the
ACOE
as
a
flood
control
project
which

acts
as
a
conduit
to
guide
storm
water
through
a
densely
populated
area
to
the
river.
During
the
annual

inspec3on
this
year
the
ACOE
has
determine 












520,000
 14
Binghamton NY Water Rush/Zane
Road
Storm
Sewer
‐
Provide
new
storm
sewer
system
to
control
localized
flooding
caused
by

stormwater. 












130,000
 14
Binghamton NY Water West
Side
Separa3on
Project
(Laurel,
Lathrop,
Mallard)
‐
Separa3ng
combined
sewers
into
sanitary
and
storm

sewer
systems. 












688,750
 16
Binghamton NY Water Rock
Bofom
Flood
Wall
‐
Provide
improvements
and
rehabilita3on
of
an
exis3ng
structure,
integral
to
the

flood
water
control
system.
Provide
addi3onal
capacity
for
local
stormwater
management
system. 












225,000
 20
Binghamton NY Water Laurel
Ave
Stormwater
Pump
Sta3on
extension
‐
this
project
will
extend
an
ongoing
Combined
Sewer

sepera3on
project
for
several
blocks. 










1,250,000
 22
Binghamton NY Water Park
Avenue
Sanitary
Sewer
‐
Sewer
separa3on
of
exis3ng
combined
sewer
system. 












475,000
 22
Binghamton NY Water Annual
Water
Main
replacement
and
upgrade. 










1,500,000
 24
Binghamton NY Water Annual
Sewer
replacement
and
upgrade. 










2,000,000
 26
Binghamton NY Water McDonald
Avenue
Pump
Sta3on
‐
Pump
sta3on
improvements
to
increase
capacity
and
improve
performance,

which
will
support
local
urban
redevelopment
in
a
mixed
use
neighborhood. 












321,500
 26
Binghamton NY Water Small
Water
Meter
replacement

"City
wide"
14,300
meters
will
be
replaced
by
new
electronic
radioread

meters.
Water
conserva3on
will
be
greatly
improved.
 










3,932,500
 32
Brighton NY Streets/Roads Senator
Kea3ng
Boulevard 










3,600,000
 40
Buffalo NY CDBG Johnny
B.
Wiley
Sports
Complex
roof
&
structural
repairs
 














53,500
 5
Buffalo NY CDBG Riverbend
development
plan 












100,000
 5
Buffalo NY CDBG Center
for
Transporta3on
Excellence 












250,000
 10
Buffalo NY CDBG Moselle
Clinic
repairs
and
improvements
 












214,000
 10
Buffalo NY CDBG Sycamore
Village
clean
up,
southeast
corner
 












200,000
 10
Buffalo NY CDBG 664
Washington
Street
roof
repair
 












250,000
 12
Buffalo NY CDBG Cri3cal
infrastructure/
key
resource
protec3on
recommended
by
Buffalo
UASI,
NIPP,
and
Dept.
of
Homeland

Security 












321,000
 15
Buffalo NY CDBG District
heat
distribu3on
system
replacement 












214,000
 15
Buffalo NY CDBG Buffalo
&
Erie
County
Historical
Society
electrical
system
upgrade 












642,000
 20
Buffalo NY CDBG City
wide
Buffalo
Public
library
repairs
including:

Crane
Branch,
Dudley
Branch,
East
Clinton
Branch,
East

Delavan
Branch 












767,000
 20
Buffalo NY CDBG African
Cultural
Center
bldg.
construc3on 










1,000,000
 30
Buffalo NY CDBG Fire
Headquarters:
Replacement
of
defec3ve
non
efficient
windows,
replacement
of
window
air
condi3oners

with
central
units


 












875,000
 30
Buffalo NY CDBG Beverly
A.
Gray
Incubator
project 










2,000,000
 60
Buffalo NY CDBG Police
Garage:
Replacement
of
40
year
old
boiler
hea3ng
system,
installa3on
of
new
electrical
system,
present

system
is
40
years
old.

Replace
all
exis3ng
light
fixtures
over
20
years
old.

New
double
pane
windows
in

mechanic
area
and
other
loca3ons
n 










1,941,000
 58
Buffalo NY CDBG Broadway
Market
roof
reconstruc3on
and
general
building
improvements 










2,000,000
 60
Buffalo NY CDBG Hickory
Woods
environmental
clean
up

 










2,500,000
 75
Buffalo NY CDBG Community
Centers:
Approximately
10
centers
need

double
insulated
windows
units,
energy
efficient
hea3ng

systems,

replacement
of
defec3ve
bathroom
fixtures
with
water
savers,
structural
repairs
and
electrical

upgrades

 










2,117,927
 100
Buffalo NY CDBG Village
farms
environmental
clean
up 










5,000,000
 150
Buffalo NY CDBG Various
firehouses:
Replacement
of
non
energy
efficient
windows,
insulated
garage
doors,
new
hea3ng

systems
for
units
over
20
year
of
age.

There
are
over
25
firehouses
that
this
would
address
 










3,300,000
 115
Buffalo NY CDBG Erie
Basin
Marina
improvements:
docks
and
infrastructure
 










3,000,000
 90
Buffalo NY CDBG Scajaquada
Creek
dredging
and
Delaware
park
improvements 










6,600,000
 200
Buffalo NY CDBG Public
Works
Buildings:
Updated
energy
efficient
electrical
and
ligh3ng,
windows,
to
replace
single
pane
glass

with
double
insulated
newer
standard
upgrades.

Boilers
that
are
non
efficient
would
be
important
energy

savers.

Bathrooms
fixture
replacement 










6,825,000
 205
Buffalo NY CDBG Darwin‐Mar3n
house
project 










7,000,000
 210
Buffalo NY CDBG Buffalo
Lakeside
Commerce
park
environmental
clean
up 










7,000,000
 210
Buffalo NY CDBG Buffalo
historic
building
repair
and
redevelopment
 










7,100,000
 212
Buffalo NY CDBG 90
Hopkins
environmental
clean
up 










7,500,000
 225
Buffalo NY CDBG City
Hall:
Replacement
of
defec3ve
central
air
condi3oning
units,
Northern
side
windows
replacement
with

double
insulated
units,
new
energy
efficient
accent
ligh3ng
to
exterior
of
building,

replacement
of
defec3ve

bathroom
fixtures
with
water
savers, 










7,500,000
 225
City State Program Project
Descrip3on Funding
Required Jobs
Buffalo NY CDBG 1260
South
Park
environmental
clean
up 








15,000,000
 400
Buffalo NY CDBG 59
Memorial
environmental
clean
up 








15,000,000
 400
Buffalo NY CDBG BNMC
Mul3‐Modal
Transporta3on
Structure 








25,000,000
 700
Buffalo NY CDBG Buffalo
Park
System:
Rehab
and
repair
of
park
infrastructure:

Mar3n
Luther
King
Jr.
Park,

LaSalle
Park,


Riverside
Park,

Shoshone
Park,

Roosevelt
Park,

Cazenovia
park,

Delaware
Park,

Schiller
Park,

Emerson
Park,


Sole
Park
and
Willert
Park 








49,203,050
 1900
Buffalo NY Energy Solar
Panel
Energy
Savings
job
training
&
placement
center 












285,000
 10
Buffalo NY Energy Perc
to
wet
clean
technology
&
training
center 












300,000
 15
Buffalo NY Energy City
wide
Green
Infrastructure:
Greening
on
vacant
lots
and
ground
water
reten3on,
storm
water
collec3on,

treatment
and
infiltra3on

 










1,500,000
 50
Buffalo NY Energy Buffalo
geothermal

 








11,000,000
 330
Buffalo NY Energy Buffalo
Green
R&D
incubator
for
renewable
energy
and
site
infrastructure
upgrades:
rail,
roads
and
Buffalo

River
improvements
 








16,000,000
 500
Buffalo NY Housing Housing
repair
and
emergency
demoli3on 








45,000,000
 1800
Buffalo NY Public
Safety Buffalo
Fire
Dept.:
Fire
apparatus
 










1,952,155

Buffalo NY Public
Safety Buffalo
Police
&
Fire
radio
system
 










2,140,000

Buffalo NY Public
Safety Camera
surveillance
monitoring
room
expansion 












300,000

Buffalo NY Public
Safety Buffalo
Police:
Gunshot
detec3on
locator
enhancement 












500,000

Buffalo NY Public
Safety Buffalo
Fire
Dept.:

Mobile
data
system 












798,610

Buffalo NY Streets/Roads Middlesex
Ave.
reconstruc3on 












230,496
 10
Buffalo NY Streets/Roads Hickory
Woods
infrastructure
improvements 












625,000
 19
Buffalo NY Streets/Roads Broadway
corridor
improvements
 












750,000
 21
Buffalo NY Streets/Roads Citywide
emergency
bridge
repairs 












750,000
 21
Buffalo NY Streets/Roads Intersec3on
realignment,
Franklin/
Linwood/
North
Pearl 












750,000
 21
Buffalo NY Streets/Roads North
Buffalo;
Grant
St./Amherst
St./Hertel
Ave.
improvements 












820,000
 27
Buffalo NY Streets/Roads Erie
Canal
horbor
streets
‐
Phase
III 












933,000
 28
Buffalo NY Streets/Roads Porter
Ave.
streetscape
–
Phase
I
 












850,000
 28
Buffalo NY Streets/Roads Hopkins
Street
bridge
replacement
 










1,000,000
 30
Buffalo NY Streets/Roads Buffalo
River
greenway,
mul3‐purpose
trail 










1,500,000
 45
Buffalo NY Streets/Roads Larkin
District
streetscape
and
mill 










1,500,000
 45
Buffalo NY Streets/Roads City
wide
sidewalk
replacement
 










2,000,000
 60
Buffalo NY Streets/Roads Tifft
Street
bridge
and
streetscape
improvements
 










2,000,000
 60
Buffalo NY Streets/Roads Exchange
Street
improvements 










1,494,000
 45
Buffalo NY Streets/Roads Fargo
St.
repair
and
streetscape 










2,001,000
 60
Buffalo NY Streets/Roads Humboldt
park
streetscape
 










2,000,000
 60
Buffalo NY Streets/Roads Michigan
Ave.
corridor
improvements 










2,001,000
 60
Buffalo NY Streets/Roads Niagara
St.
gateway
project 










2,000,000
 60
Buffalo NY Streets/Roads Pearl
Street
conversion
to
two
way
traffic
 










2,000,000
 60
Buffalo NY Streets/Roads Main
Street
700
block
improvements 










2,167,000
 64
Buffalo NY Streets/Roads South
Park
improvements,
streetscape
&
paving
Bailey
Ave.
to
city
line
 










3,000,000
 90
Buffalo NY Streets/Roads BNMC,
Phase
‐
I

Ellicof
St.
Streetscape
improvement 










2,400,000
 72
Buffalo NY Streets/Roads Porter
Ave.
streetscape
–
Phase
II 










2,400,000
 72
Buffalo NY Streets/Roads Seneca/Hopkins/
McKinley/S.
Park
Ave.
improvements 










4,000,000
 120
Buffalo NY Streets/Roads Erie
Canal
Harbor
streets
‐
Phase
II 










3,598,000
 105
Buffalo NY Streets/Roads BNMC
Phase
II
streetscape
improvements 










4,010,000
 120
Buffalo NY Streets/Roads Fillmore
Ave.
resurfacing
and
streetscape 










4,000,000
 120
Buffalo NY Streets/Roads W
Ferry
St/Black
Rock
Canal
(bridge
rehab) 










3,999,000
 120
Buffalo NY Streets/Roads Buffalo
Lakeside
Commerce
Park
‐
Phase
4
Rd. 










5,000,000
 150
Buffalo NY Streets/Roads Various
signal
replacement;
Ferry
St.
&
Delavan
Ave. 










5,000,000
 150
Buffalo NY Streets/Roads City‐wide
street
improvements:
mill,
overlay,
and
sidewalks 










6,000,000
 180
Buffalo NY Streets/Roads Babcock
St./Norfolk
Southern
Bridge
replacement 










8,000,000
 212
Buffalo NY Streets/Roads BNMC
phase
3;
Allen
Street
extension 










7,504,000
 225
Buffalo NY Streets/Roads Kenmore
Ave.;
Starin
Ave
‐
Rt
5
(Main
Street)
improvements 








10,000,000
 300
Buffalo NY Streets/Roads Cars
on
Main
Street,
600
block
 








10,000,000
 300
Buffalo NY Streets/Roads Bailey
Avenue
Bridge
Replacement
 








16,000,000
 500
Buffalo NY Streets/Roads Rt
5;
Rt
198
to
Hertel
Ave.
‐
(Main
St.)
improvements 








22,619,000
 675
Buffalo NY Streets/Roads Tifft
Street
connector 








35,000,000
 1050
Buffalo NY Streets/Roads Cars
on
Main
Street
–
100
to
500
blocks
 






100,000,000
 4000
Buffalo NY Streets/Roads Southdown's
Connector‐Phase
I 








52,000,000
 1560
Buffalo NY Transit City
street
vehicles
replacement
–
energy
efficient
vehicles 










1,000,000

Buffalo NY Water Sewer
storm
water
separa3on
system 










1,500,000
 45
Buffalo NY Water Various
Loca3ons
3
–
rehabilita3on
or
replacement
of
exis3ng
“low
flow”
water
mains
at
various
loca3ons

throughout
City
to
provide
minimum
field
measured
hydrant
flow
of
500
gallons
per
minute 










2,000,000
 60
Buffalo NY Water GIS
Data
Management
–
Conversion
of
all
our
paper
records
into
GIS
for
opera3on
efficiency 










1,000,000
 30
Buffalo NY Water Disinfec3on
System
Rehabilita3on
–
rehabilita3on
and
process
enhancement
of
exis3ng
disinfec3on

equipment 










2,000,000
 60
Buffalo NY Water Dechlorina3on
/
Sewer
for
Thickener
Decant–
installa3on
of
a
new
underground
conduit
and
dechlorina3on

facili3es
to
allow
decant
from
the
thickener
process
to
be
discharge
and
not
re‐cycled
in
the
treatment
process











2,500,000
 75
Buffalo NY Water New
Low
Service
Pumps
–
rehabilita3on
of
exis3ng
low
service
pumps
including
a
new
pump
for
opera3onal

performance
and
energy
savings 










3,500,000
 105
Buffalo NY Water Construc3on
of
a
floatables
control
facility
 








15,000,000
 400
City State Program Project
Descrip3on Funding
Required Jobs
Buffalo NY Water Modifica3ons
to
sewer
authority
incinerator 










7,500,000
 280
Buffalo NY Water Seneca
Street:
Replacement
of
exis3ng
water
mains
at
various
loca3ons
in
southeast
quadrant
of
City
with

increase
in
pipe
size
to
improve
water
supply
 










3,000,000
 100
Buffalo NY Water Clinton
Street,
Lower
Terrace
to
Jefferson
Avenue
–
rehabilita3on
of
36‐inch
diameter
principal
water

transmission
main
in
City’s
downtown
business
district
to
maintain
water
supply
for
domes3c
use
and
fire

protec3on 










4,000,000
 120
Buffalo NY Water Filter
Plant
Solids
Handling
Facility
–
installa3on
of
equipment
and
appurtenances
to
allow
solids
thickening
on

site
to
improve
opera3on 










4,000,000
 120
Buffalo NY Water Michigan
Avenue,
Virginia
Street
to
Best
Street
–
rehabilita3on
of
36‐inch
diameter
principal
water

transmission
main
in
City’s
hospital
corridor
to
maintain
water
supply
for
domes3c
use
and
fire
protec3on 










2,000,000
 60
Buffalo NY Water Replacement
of
exis3ng
water
mains
at
various
loca3ons
in
northern
half
of
City
to
maintain
adequate
water

supply
for
domes3c
use
and
fire
protec3on 










4,000,000
 120
Buffalo NY Water Replacement
of
exis3ng
water
mains
at
various
loca3ons
in
southern
half
of
City
to
maintain
adequate
water

supply
for
domes3c
use
and
fire
protec3on 










4,000,000
 120
Buffalo NY Water Storage
and
Pump
Sta3ons
–
Rehabilita3on
of
exis3ng
storage
tanks
and
pump
sta3ons 










5,000,000
 150
Buffalo NY Water Various
Loca3ons
4
–
replacement
of
exis3ng
water
mains
at
addi3onal
various
loca3ons
in
northern
half
of

City
to
maintain
adequate
water
supply
for
domes3c
use
and
fire
protec3on 










5,000,000
 150
Buffalo NY Water Various
Loca3ons
5
–
replacement
of
exis3ng
water
mains
at
addi3onal
various
loca3ons
in
southern
half
of

City
to
maintain
adequate
water
supply
for
domes3c
use
and
fire
protec3on 










5,000,000
 160
Buffalo NY Water New
High
Service
Pumps
–
installa3on
of
new
high
service
pumps
for
opera3onal
performance
and
energy

savings 










7,000,000
 180
Buffalo NY Water New
System
Storage
Tank
–
Installa3on
of
a
5
million
gallon
storage
tank
to
provide
addi3onal
system

redundancy
and
opera3onal
flexibility 










7,000,000
 280
Buffalo NY Water Renova3ons
at
Buffalo
Sewer
Authority 








40,000,000
 1600
Freeport NY CDBG 162‐164
North
Main
Street 












200,000
 5
Freeport NY CDBG 81‐83
South
Main
Street 












200,000
 5
Freeport NY CDBG 18
East
Sunrise
Highway 












300,000
 6
Freeport NY CDBG Downtown
comm.
Rehab
for
159‐167
North
Main
Street 












300,000
 8
Freeport NY Energy Supplemental
Solar
Hea3ng
for
Rec.
Center
pools 












250,000
 10
Freeport NY Energy Installa3on
of
energy
efficient
hea3ng
system
and
solar
panels
at
Frpt.
Recrea3on
Ctr. 










1,500,000
 15
Freeport NY Energy Fuel
cells
for
Electric
Offices
site
to
take
load
from
Electric
Grid 










3,500,000
 20
Freeport NY Energy Fuel
cells
for
Village
Hall
‐
install
fuel
cell
at
Village
Hall
site
to
take
load
from
Village
Hall
Electric
grid 










3,500,000
 20
Freeport NY Energy Install
LED
parking
field
ligh3ng
‐
replace
exis3ng
HPS
or
MH
parking
field
street
ligh3ng
w/
LED
parking
street

ligh3ng 












250,000
 20
Freeport NY Energy Purchase
20
full
electric
cars
(Village
use),
build
solar
parking
structures
at
3
loca3ons
to
accommodate
parking

&
charging
of
vehicles 










1,000,000
 30
Freeport NY Energy Install
100KW
grid
connected
solar
array
w/
real
3me
online
sta3s3cs
accesible
to
everyone 










1,100,000
 40
Freeport NY Energy Replace
exis3ng
emmission
control
system
reducing
NOX
&
CO
emissions
from
village
gas
turbine 










6,500,000
 40
Freeport NY Energy Site
&
develop
alterna3ve
fuel
filling
sta3on.
Sta3on
would
have
Solar
charging
sta3ons
for
Electric
vehicles,

compress
natural
gas
fill
sta3on,
biodiesel
filling
sta3on,
E85
ethanol
filling
sta3on 










3,000,000
 50
Freeport NY Energy Install
Geothermal
hea3ng
&
cooling
at
Rec.
Center,
Village
Facili3es,
Library 










4,500,000
 150
Freeport NY Public
Safety 7
Months
Police
academy
salaries,
5
Months
increased
rate
salaries,
shib
and
holiday
salaries 












710,841
 11
Freeport NY Public
Safety Fringe
Benefits‐FICA/MEDI,
Medical/Dental/Re3rement 












268,931
 11
Freeport NY Public
Safety Maintenance
‐Uniform/Equipment 














12,100
 11
Freeport NY Streets/Roads Rehabilita3on
of
parking
field
#11
and
#12 










3,000,000
 25
Freeport NY Streets/Roads 2009
Road
Improvement
Project
for
N.
Columbus
Ave.,
Washington
St.,
Archer
St.,
Cary
Pl.,
Davison
Pl.,
Lewis

St.,
May
Ct.,
Prince
Ave. 










1,840,000
 30
Freeport NY Streets/Roads Road
Improvement
&
Grade
Raise
Project
for
South
Ocean
Ave.,
Miller
Ave.,
Nassau
Ave. 










4,700,000
 53
Freeport NY Water Sewer
Relining
Program
that
will
stop
infiltra3on
of
ground
water
into
sewer
lines 










2,000,000
 30
Freeport NY Water Replace
aging
4
inch
(undersized)
water
mains 










4,000,000
 40
Hempstead NY CDBG Build
an
indoor
soccer
field 










1,000,000
 20
Hempstead NY CDBG refurish
sanita3on
building 












300,000
 25
Hempstead NY CDBG Expand
Library
‐
Green 










5,000,000
 100
Hempstead NY CDBG Expand
Village
Hall
‐
Green 








15,000,000
 100
Hempstead NY CDBG Build
Recrea3on
Center
on
Terrace
Ave
1.
Basketball
Courts
4
2.
Classroms
for
tutoring
3.
Exercise
Rooms
5 










8,000,000
 200
Hempstead NY Energy Install
solar
panels
on
village
buildings
and
new
water
heaters
&
broilers 










1,000,000
 20
Hempstead NY Housing Affordable
homes
50
‐
Green 








15,000,000
 200
Hempstead NY Public
Safety 20
New
Hybrid
cars 












200,000
 10
Hempstead NY Public
Safety New
radio
system 












500,000
 10
Hempstead NY Public
Safety Shot
spofer
cameras 










1,000,000
 10
Hempstead NY Public
Safety Build
new
police
hq 








10,000,000
 300
Hempstead NY Schools Build
new
schools
2
 








50,000,000
 500
Hempstead NY Streets/Roads Improve
all
streets
in
Hempstead 








20,000,000
 300
Hempstead NY Transit Replace
all
calls
with
hybrids 










5,000,000

Hempstead NY Water Cover
for
water
system 










4,000,000
 20
Hempstead NY Water Replace
aging
sewer
system
and
road
repair.
Washington,
Clinton,
sewer
pumping
sta3ons 








10,000,000
 30
Hempstead NY Water Dig
water
wells
‐
3 








10,000,000
 50
Jamestown NY Streets/Roads Rehabilita3on
of
the
Spring
Street
Parking
Ramp.

The
project
consist
of
major
structural
repairs
to
a
5‐level

open
parking
structure
owned
by
the
City
of
Jamestown,
which
is
the
primary
parking
feature
in
the
City’s

Central
Business
District
 










1,700,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Jamestown NY Streets/Roads Par3al
Reconstruc3on
of
W.
5th
Street
(State
Touring
Route
394)
from
Fairmount
Avenue
to
Washington
Street.


The
project
consists
of
par3al
reconstruc3on
of
the
six
(6)
blocks
of
W.
5th
Street
which
is
currently
owned
by

the
City
(see
the
enclosed
map 












950,000
 35
Jamestown NY Streets/Roads Par3al
Reconstruc3on
of
W.
6th
Street
(State
Touring
Route
394)
from
Fairmount
Avenue
to
Clinton
Street,
and

from
Washington
Street
to
N.
Main
Street.

The
project
consists
of
par3al
reconstruc3on
of
the
five
(5)
blocks

of
W.
6th
Street
which
is
curre 












720,000
 35
New
Rochelle NY CDBG This
project
represents
the
third
of
a
three‐phased
project
to
improve
the
North
Avenue
Corridor.

The
benefits

include
road
widening,
new
sidewalks
with
granite
curbs,
street
paving,
decora3ve
ligh3ng,
tree
plan3ng,
new

striping
of
crosswalks
and
park 










3,000,000
 100
New
Rochelle NY Energy This
project
would
augment
the
boiler
and
HVAC
system
renovaitons
in
terms
of
savings
on
fuel
and
energy

costs
by
replacing
an3quated
inefficient
single
glaze,
aluminum
frame
windows
with
high
efficiency
insulated

double
glaze
windows
 










1,750,000
 50
New
Rochelle NY Public
Safety Security
Camera
Network
The
project
will
install
20
cameras
in
sensi3ve
loca3ons
throughout
the
City,
including
the
New
Rochelle
Transit

Center,
the
Central
Business
District,
and
other
areas
iden3fied
by
law
enforcement
personnel. 












190,000
 50
New
Rochelle NY Streets/Roads North
Avenue
Resurfacing
RESURFACING
AND
JOINT
REPAIR
OF
NORTH
AVENUE,
SOUTH
OF
MAIN
STREET
AND
IN
WYKAGYL.
A
MUCH

NEEDED
IMPROVEMENT
ALONG
ONE
OF
THE
CITY'S
MAJOR
THOROUGHFARES.
RESURFACING
OF
THE

STREET

PAVEMENT
IS
NECESSARY
IN
THIS
SECTION
 












375,000
 20
New
Rochelle NY Streets/Roads Main
Street
Resurfacing
(mill
and
fill)

This
project
would
bolster
our
City‐wide
roadway
improvements
in
the
major
economic
corridor
of
the
City.

 










3,000,000
 50
New
Rochelle NY Streets/Roads Street
resurfacing
city‐wide
This
project
would
bolster
the
annual
street
resurfacing
by
addressing
problem
areas,
and
suppor3ng

infrastructure
improvements.
 










5,000,000
 50
New
Rochelle NY Water Marina
Dredging

This
project
will
dredge
parts
of
municipal
marina
due
to
the
accumula3on
of
solid
materials
sefling
at
its

bofom
and
displacing
the
water
volume
and
storage
capacity.

The
municipal
marina
is
an
economically
viable

enterprise
 










2,000,000
 50
Rochester NY Energy Revitalizing
Vacant
Proper3es
with
Clean
Energy
Systems
Grant
funding
will
be
provided
for
the
improvement
of
vacant
single
family
homes
that
can
be
transformed
to

sustainable
owner
occupied
proper3es,
and
in
implemen3ng
clean
energy 










1,500,000

Rochester NY Energy City
Facili3es
Energy
Efficiency
Program
Make
upgrades
to
ligh3ng
systems,
replace
all
incandescent/
fluorescent
exit
signs
to
LED,
install
Energy
Star

windows/film
3n3ng,
and
improve
building
insula3on
at
18
different
City‐owned
facili3es 












500,000

Rochester NY Energy Rochester
Riverside
Conven3on
Center
Energy
Upgrades
Make
upgrades
to
exis3ng
ligh3ng
systems,
cooling
tower,
and
electronic
signage
to
obtain
significant
energy

efficiency
benefits.














400,000

Rochester NY Energy Chestnut
Street
Firehouse
HVAC
Upgrades
Descrip3on:
Upgrade
exis3ng
inefficient,
aging
(exis3ng
system
is
roughly
70
years
old)
steam
HVAC
system
in

historic
downtown
firehouse
to
modernize
and
increase
efficiency. 












575,000
 4
Rochester NY Energy Mercury
Vapor
Streetlight
Replacement
Project
Descrip3on:
Replace
exis3ng
inefficient
mercury
vapor
street
lights
with
more
efficient
high
pressure
sodium

and/or
LED
ligh3ng
systems
to
increase
ligh3ng
(from
.5
lumens
to
~1
lumen)
and
decrease
energy 










1,100,000
 4
Rochester NY Energy Blue
Cross
Arena
Energy
Efficiency
Upgrades
Descrip3on:
Make
series
of
HVAC
and
mechanical
upgrades
to
indoor
sports
arena
to
reduce
large
load
swings

during
ice‐making.
Project
is
the
result
of
a
NYSERDA
study
and
will
pay
back
its
investment
within
4
 












831,000
 5
Rochester NY Energy Edgerton
Recrea3on
Center
Upgrades
Descrip3on:
Upgrade
exis3ng
inefficient
ligh3ng
and
HVAC
systems
in
a
historic
neighborhood
community

center
facility.
Cost:
$1.315
million
Energy
Cost
Savings:
TBD
GHG
Emissions
Reduc3on:
TBD











1,315,000
 8
Direct
Jobs
Creat
Rochester NY Energy Rundel
Library
HVAC
Upgrades
Descrip3on:
Replace
aging
inefficient
HVAC
system
in
opera3on
for
more
than
30
years
at
historic
landmark

central
library
building
with
new
high‐efficiency
HVAC
system
Cost:
$2.2
million
Energy
Cost
Savings:
$88,000/year 










2,200,000
 8
Rochester NY Streets/Roads Stutson
Street
Reconstruc3on‐Reconstruct
Stutson
Street
between
Lake
Avenue
and
River
Street
to
replace

failing
pavement,
narrow
the
street,
and
widen
sidewalks
to
support
con3nued
revitaliza3on
of
the
Port
of

Rochester
area. 












400,000
 20
Rochester NY Streets/Roads 
Orchard‐Whitney
Brownfield
Site

To
help
finance
the
environmental
cleanup
of
a
four
acre
Brownfield
Site
located
at
354
Whitney
Street
and

415
Orchard
Street.

A
$200,000
grant
applica3on
was
submifed
for
this
project
to
the
US
EPA 












200,000
 25
Rochester NY Streets/Roads 2009
Bridge
Maintenance
Program
Double
the
scope
of
the
City’s
currently‐programmed
Bridge
Maintenance
Program
to
accomplish
more

comprehensive
maintenance
of
the
City’s
many
bridges;
oben
considered
the
most
cri3cal
links. 










1,100,000
 26
Rochester NY Streets/Roads Cultural
District
Sidewalk
Replacement
Replace
or
rehabilitate
exis3ng
brick
sidewalks
in
the
Cultural
District
of
Downtown
Rochester
to
improve

pedestrian
safety
and
accessibility
in
a
vibrant
mixed‐use
neighborhood. 










1,100,000
 26
Rochester NY Streets/Roads La
Avenida
Streetscape
Improvements

Construct
enhancements
to
the
North
Clinton
Avenue
(La
Avenida)
streetscape
between
Upper
Falls
Boulevard

and
Avenue
D
to
support
economic
development
in
an
ethnically‐diverse,
economically‐distressed
area











1,100,000
 26
Rochester NY Streets/Roads South
Clinton/Mount
Hope
Enhancements
Construct
curb
extensions,
install
new
sidewalks
and
crosswalks,
and
enhance
ligh3ng
in
order
to
calm
traffic

and
improve
the
pedestrian
environment
on
South
Clinton
Avenue 










1,250,000
 31
Rochester NY Streets/Roads Brooks
Avenue
Reconstruc3on
Reconstruct
Brooks
Avenue
between
Genesee
Park
Boulevard
and
the
Erie
Canal/West
City
Line
to
address

traffic
safety
and
efficiency,
improve
the
pedestrian
environment,
and
create
an
afrac3ve
gateway
 










1,775,000
 44
City State Program Project
Descrip3on Funding
Required Jobs
Rochester NY Streets/Roads East
Henriefa
Road
Reconstruc3on
Reconstruct
East
Henriefa
Road,
from
Mount
Hope
Avenue
to
the
Erie
Canal/City
Line,
to
address
failing

pavement
and
drainage,
improve
the
pedestrian
environment,
and
improve
the
general
appearance
 










2,000,000
 48
Rochester NY Streets/Roads 2009
Hazardous
Sidewalk
Replacement
Program
Double
the
scope
of
the
City’s
currently‐programmed
Hazardous
Sidewalk
Replacement
Program
for
2009
to

repair
or
replace
significantly
more
hazardous
sidewalks
to
improve
mobility 










2,000,000
 49
Rochester NY Streets/Roads Genesee
Riverway
Trail
Rehabilita3on
Rehabilitate
the
heavily‐used
southern
segment
of
the
Genesee
Riverway
Trail,
a
mul3‐use
trail
along
both

sides
of
the
Genesee
River,
between
Ford
Street
and
the
Erie
Canal.











2,000,000
 49
Rochester NY Streets/Roads Genesee
River
Crossroads
Park
Plaza
Deck
The
Genesee
River
Crossroads
Park
is
a
focal
point
for
public
access
and
gathering
along
the
Genesee.
It
is
in

need
of
major
structural
repairs
to
the
plaza
deck
which
also
serves
as
the
roof
 










2,200,000
 50
Rochester NY Streets/Roads Jefferson
Avenue
Revitaliza3on
Design
and
construc3on
of
enhancements
to
Jefferson
Avenue
in
the
City’s
southwest
quadrant,
including
new

sidewalks,
crosswalks,
ligh3ng,
curb
modifica3ons,
and
streetscape
improvements.
 










2,500,000
 60
Rochester NY Streets/Roads 2009
Milling
&
Resurfacing
Program
Double
the
scope
of
the
City’s
currently‐programmed
Milling
and
Resurfacing
Program
to
accomplish

significantly
more
preven3ve
maintenance
on
City
streets
in
2009.











3,000,000
 72
Rochester NY Streets/Roads Mt.
Hope
Avenue
Reconstruc3on
–
Phase
1
Reconstruct
Mount
Hope
Avenue,
an
NHS
Principal
Arterial,
between
Elmwood
Avenue
and
Rossiter
Road,
to

address
cri3cal
safety
deficiencies,
mi3gate
significant
traffic
conges3on,
improve
walkabil 










5,000,000
 231
Rochester NY Streets/Roads 
ARTWalk
2
Construct
an
extension
to
the
successful
ARTWalk
urban
art
trail,
pedestrian
safety
improvements
at
East

Avenue
and
North
Goodman
Street,
a
public
gateway
plaza
adjacent
to
the
Rochester
Museum
&
Science

Center,
and
public
art. 










3,300,000
 303
Rochester NY Streets/Roads Broad
Street
Tunnel
Rehabilitate
deteriora3ng
subway
tunnel
underneath
Broad
Street
in
Downtown
Rochester
to
address
cri3cal

safety
deficiencies,
rehabilitate
surface
street
above
tunnel,
and
add
context‐sensi3ve
ameni3es 








10,000,000
 756
Rochester NY Water Charlofe
(West)
/Summerville
(East)
Pier
Safety
Enhancement
To
make
needed
improvements
and
enhance
the
recrea3onal
u3lity,
naviga3on
safety
and
performance
of
the

piers,
the
City
of
Rochester
requests
Army
Corps
funding
to
conduct
 










1,000,000
 25
Rochester NY Water 425‐435
Mount
Hope
Site
Environmental
Remedia3on
Project
Erie
Harbor
on
the
Genesee
River
Environmental
remedia3on
of
land
adjacent
to
the
Genesee
River
in
downtown
Rochester
to
facilitate

riverfront
development. 










1,000,000
 25
Rochester NY Water Durand
Eastman
Beach
Water
Quality
Improvements
To
make
needed
water
quality
improvements
at
Durand
Eastman
Beach
on
Lake
Ontario.
The
project
will
install

a
low
flow
Smart
Sponge
Filter
Treatment
at
the
Camp
Eastman
tributary
discharge 










1,600,000
 40
Schenectady NY Amtrak Funds
to
be
used
for
the
Schenectady
Amtrak
Sta3on
replacement
and
improvements. 










8,700,000
 72
Schenectady NY CDBG Funds
to
be
used
for
CDBG
neighborhood
water/sewer
improvements. 










6,000,000
 20
Schenectady NY CDBG Funds
to
be
used
for
the
new
construc3on
of
a
16
unit
homeless
shelter
in
the
City
of
Schenectady,
which
will

resolve
chronic
homelessness
in
Schenectady
County. 










1,000,000
 25
Schenectady NY CDBG Funds
to
be
used
for
the
new
construc3on
of
Universal

Design/Green
Affordable
Housing
(10
units). 










3,000,000
 27
Schenectady NY CDBG Funds
to
be
used
for
the
demoli3on
of
dilapidated
structures
impac3ng
public
health
and
safety. 










3,000,000
 40
Schenectady NY CDBG Funds
to
be
used
for
CDBG
neighborhood
street
rehabilita3on. 








15,000,000
 52
Schenectady NY CDBG Funds
to
be
used
for
the
new
construc3on
of
the
City
of
Schenectady's
Public
Works
Facility. 








22,000,000
 80
Schenectady NY Energy Funds
to
be
used
to
reduce
energy
use
at
the
water
treatment
plant
(metered
system). 








15,000,000
 15
Schenectady NY Energy Funds
to
be
used
for
renewable
energy
features(solar,
photovoltaics)
for
10
units
of
Universal
Design/Green

Affordable
Housing. 












200,000
 16
Schenectady NY Energy Funds
to
be
used
to
reduce
Schenectady's
carbon
footprint/reduce
energy
costs
by
replacing
original
windows

on
Schenectady
City
Hall
(c.
1932)
and
the
reconstruc3on
of
the
original
skylight.
 










2,000,000
 20
Schenectady NY Housing Funds
to
be
used
for
the
moderniza3on
of
the
Schenectady
Municipal
Housing
Authority's
housing
units. 












700,000
 36
Schenectady NY Public
Safety Funds
to
be
used
for
COPS‐funded
police
personnel. 












450,000
 6
Schenectady NY Public
Safety Funds
to
be
used
for
a
centralized
public
safety
dispatch
center.
 












500,000
 10
Schenectady NY Public
Safety Funds
to
be
used
for
police
technology
equipment
including
security
cameras
and
for
a
crime
tracking
data

base. 












800,000
 10
Schenectady NY Public
Safety Funds
to
be
used
for
Schenectady
Police
Sta3on
improvements
including
equipment. 












100,000
 16
Schenectady NY Schools Funds
to
be
used
for
the
construc3on
of
the
"Science
Center
of
Tech
Valley",
a
regional
science
educa3on

center
in
the
City
of
Schenectady
(LEED‐cer3fied
"green"
building).
 








55,000,000
 296
Schenectady NY Streets/Roads Funds
to
be
used
for
Upper
Union
Street
streetscape
improvements. 










3,000,000
 22
Schenectady NY Streets/Roads Funds
to
be
used
for
Nof
Terrace
streetscape
improvements. 










5,000,000
 27
Schenectady NY Streets/Roads Funds
to
be
used
for
Van
Vranken
Avenue
streetscape
improvements. 










5,000,000
 27
Schenectady NY Streets/Roads Funds
to
be
used
for
citywide
street
and
sidewalk
rehabilita3on. 








10,000,000
 35
Schenectady NY Streets/Roads Funds
to
be
used
for
State
Street

transporta3on
oriented
development
streetscape
improvements. 










7,000,000
 35
Schenectady NY Water Funds
to
be
used
for
the
North
Ferry
Pump
Sta3on
upgrade. 












700,000
 7
Schenectady NY Water Funds
to
be
used
for
a
gravity
belt
thickener. 












200,000
 8
Schenectady NY Water Funds
to
be
used
for
Oneida
Street
storm
sewer
improvements. 










1,500,000
 15
Schenectady NY Water Funds
to
be
used
for
the
replacement
of
water
transmission
mains. 










3,500,000
 15
Schenectady NY Water Funds
to
be
used
for
co‐genera3on
using
digester
gas. 










3,000,000
 22
White
Plains NY Housing 86
Dekalb
Ave
Apartment
Door
Hardware 














90,000
 2
White
Plains NY Housing Maintenance
Equipment 














60,000
 2
White
Plains NY Housing Oil
Tank
Replacement 












150,000
 2
White
Plains NY Housing Upgrade
of
Phone
Systems 














35,000
 2
White
Plains NY Housing 120
Bath
Floors 














70,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
White
Plains NY Housing 120
Lake
Street
Apartment
Entry
Doors 












200,000
 5
White
Plains NY Housing 86
Closet
Doors 














75,000
 5
White
Plains NY Housing 86
DeKalb
Ave
Apartment
Entry
Doors 












200,000
 5
White
Plains NY Housing Appliances:
Stoves,
Refrigerators,
for
120
Lake
Street
and
86
DeKalb 












325,000
 5
White
Plains NY Housing Security
Upgrade
at
86
Dekalb
and
120
Lake
Street 










1,000,000
 5
White
Plains NY Housing Stair
Treads
for
Lake/DeKalb/Winbrook 












100,000
 5
White
Plains NY Housing Upgrade
of
Master
Antenna
Systems
7
Bldgs 












250,000
 5
White
Plains NY Housing Addi3on
of
Electric
Meters
for
95
Units
at
120
Lake
Street 










1,000,000
 10
White
Plains NY Housing Elevator
Rehabs
at
120
Lake
Street 












500,000
 10
White
Plains NY Housing Addi3on
of
Electric
Meters
for
167
Units
at
86
DeKalb
Ave 










1,300,000
 15
White
Plains NY Housing Winbrook
Development 












300,000
 20
White
Plains NY Housing 1200
Windows
at
86
Dekalb
Ave
at
450/opening 












550,000
 25
White
Plains NY Housing 500
Windows
at
120
Lake
St
at
450/opening 












225,000
 25
Akron OH Airport Airport
Runway
Crack
Repair 














40,000

Akron OH Airport Airport
Taxiway
Extension 












385,000

Akron OH Airport Akron
Fulton
Airport,
Rehabilitate
Parallel
Taxiway
“P”
(Construc3on) 












902,500

Akron OH Amtrak New
Sta3on
by
Bus
terminal 








15,000,000
 100
Akron OH CDBG Barbara
Avenue
Public
Improvements
(storm
sewer,
asphalt
reconstruc3on,
curbs,
and
sidewalk). 












450,000

Akron OH CDBG Bartges
Street
Bridge
Replacement
over
Ohio
Canal 










2,695,000

Akron OH CDBG Crouse
Street
Public
Improvements
(water
main
&
storm
sewer
reconstruc3on,
asphalt
reconstruc3on,
curbs,

and
sidewalk). 












722,000

Akron OH CDBG Dover
Avenue
et
al
Public
Improvements
(storm
sewer,
asphalt
reconstruc3on,
curbs,
and
sidewalk). 












883,000

Akron OH CDBG Edgewood
Homes
Hope
VI
Public
Improvements
Ph.2 










1,532,000

Akron OH CDBG Goodyear
Sewer
Lining
and
Reloca3on
–
Eastgate
Development 










3,665,000

Akron OH CDBG Hazel
St.
Bridge
Replacement
over
L.
Cuyahoga
River 










1,222,000

Akron OH CDBG Martha
Avenue
Reconstruc3on
–
Eastgate
Development 










1,894,000

Akron OH CDBG Newton
St.
Bridge
Replacement
over
Roosevelt
Ditch 












369,300

Akron OH CDBG North
Hawkins
Avenue
Concrete
Repairs 










1,806,000

Akron OH CDBG Overlook
Drive
Public
Improvements 












149,000

Akron OH CDBG Rosalind
Court
/
Gotham
Court
Pavement
Reconstruc3on 












462,000

Akron OH CDBG Tech
Way
Public
Road
Improvements 












704,000

Akron OH CDBG Firestone
Parkway
(Wilbeth
to
Firestone
Blvd)
Roadway
Improvements 










2,000,000
 10
Akron OH CDBG Bridgestone
Infrastructure
S.
Main
Street
(Waterloo
to
Dartmore)
Broadway
Improvements 










5,000,000
 15
Akron OH CDBG Cascade
Deck
Improvements
(LED
light
fixtures
and
ceiling
paint
for
energy
saving,
sprinkler
system

replacement) 








12,000,000
 15
Akron OH CDBG Cascade
Plaza
Improvements
–
Structural
repair
to
top
of
Cascade
Parking
Deck 








10,000,000
 15
Akron OH CDBG Morley
Parking
Repair
deteriorated
concrete,
waterproof
all
parking
levels,
replace
ligh3ng
fixtures,
replace

signage,
paint
and
install
new
garage
access
system. 










1,200,000
 15
Akron OH CDBG Wilbeth
(Firestone
Parkway
to
Dallas
Roadway
Improvements 










4,500,000
 15
Akron OH CDBG Construct
a
15,000
square
foot
building
and
laboratory
for
a
new
polymer
company
in
Akron’s
Ascot
Industrial

Park
that
is
considering
reloca3ng
to
South
Carolina 










1,500,000
 20
Akron OH CDBG Construc3on
of
a
100
to
110
room
hotel
next
to
the
Akron/Summit
Conven3on
and
Visitors
Bureau
to
assist
in

afrac3ng
more
conven3ons 








14,000,000
 25
Akron OH CDBG Municipal
Service
Center/APUB
Maintenance
Combina3on
Center 








50,000,000
 30
Akron OH CDBG Acquire
and
restore
blighted
buildings
for
the
purpose
of
suppor3ng
small
inner‐city
businesses
by
housing

start‐up
businesses
that
are
now
struggling
to
gain
a
foothold
while
working
out
of
their
homes
and
garages.


Large
buildings
would
be
renovated
in 










5,000,000
 50
Akron OH CDBG Restore
and
build
out
655
South
Broadway
as
an
expansion
of
Akron’s
global
business
accelerator
for
the

emerging
“green”
technologies 










2,000,000
 50
Akron OH CDBG Goodyear
–
Infrastructure
(2009‐2010)
‐‐
Water
and
Sewer
&
River
Enhancement 










8,000,000
 100
Akron OH CDBG Market
Forge
Renewal
Area 










1,500,000
 150
Akron OH CDBG Bio‐Medical
Corridor 










1,000,000
 200
Akron OH CDBG Bridgestone
Firestone
(2009‐2010) 










2,000,000
 200
Akron OH CDBG Brown‐Graves
Infrastructure 










1,000,000
 250
Akron OH CDBG Lock
3
Redevelopment
–
reconstruc3on
of
Ohio
Canal
(storm
sewer) 










3,000,000
 250
Akron OH CDBG Provide
leasehold
improvements
to
60,000
square
feet
of
an
exis3ng
building
and
build
a
300‐space
parking

deck
to
accommodate
the
corporate
headquarters
of
a
health‐related
ins3tu3on 










4,000,000
 300
Akron OH CDBG White
Pond
Industrial
Park
–
Infrastructure 










1,000,000
 500
Akron OH Energy Copley
Road
Depot
Renova3on
Renovate
Service
Center
to
be
LEED
Cer3fied 










5,000,000

Akron OH Energy Fire
Sta3ons
Miscellaneous
Equipment 














75,000

Akron OH Energy Morley
HVAC
Replacement 












330,000

Akron OH Energy Municipal
Building
Chiller
Replacement 












325,000

Akron OH Energy Municipal
Building
Roof
HVAC
Units
Replacement 












100,000

Akron OH Energy Municipal
Service
Center
Improvements 












480,000

Akron OH Energy Stubbs
Jus3ce
Center
Electrical
Upgrade 












500,000

Akron OH Energy Green
LED
replacement
in
traffic
signal 












290,000
 4
Akron OH Energy Yellow
LED
replacement
in
traffic
signals 












200,000
 4
Akron OH Energy Muni
Building
Restrooms 












100,000
 5
Akron OH Energy Ped
light
replacement
in
traffic
signals 












365,000
 5
Akron OH Energy Red
Led
replacement
in
traffic
signals 












150,000
 5
Akron OH Energy Solar
Panels
at
Triplef 










1,000,000
 8
Akron OH Energy Installa3on
of
solar
array
at
METRO
facili3es 










1,000,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Akron OH Energy State
Expressway
Vegeta3on 








15,000,000
 15
Akron OH Energy Brewster
Creek
‐
reconstruc3on
to
realign
and
re‐establish
the
banks
for
the
creek
to
prevent
flooding
of
the

neighborhood 










5,000,000
 20
Akron OH Energy Confluence
Park
‐
to
provide
and
upgrade
a
blighted
area
along
the
canal
and
towpath
for
wetlands
adn
parks

in
southwest
Akron 










8,000,000
 30
Akron OH Energy City
of
Akron
Service
Center
Rehab
service
center
on
Market
St.
to
be
LEED
cer3fied 








10,000,000
 40
Akron OH Energy Muni
Building
green
restora3on 










8,000,000
 40
Akron OH Energy Municipal
Service
Center
Renova3on
Renovate
Service
Center
to
be
LEED
cer3fied 








20,000,000
 50
Akron OH Energy State
Route
59
‐
Realignment
Reconstruct
a
por3on
of
expressway
through
downtown
to
provide
areas
for

economic
development
and
job
growth 








40,000,000
 75
Akron OH Energy Trash
Transfer
Sta3on
‐
construct
a
new
eco‐friendly
city
trash
transfer
sta3on
to
accommodate
and
obscure

the
transfer
of
trash
from
the
residents.

This
will
be
a
LEEd
cer3fied
building 








20,000,000
 75
Akron OH Energy Court
House
Annex

Construct
court
annex
to
accommodate
more
courts
‐
LEED
cer3fied 








20,000,000
 100
Akron OH Energy Municipal
Building
Green
Renova3on
Renovate
City
building
to
be
LEED
cer3fied 








20,000,000
 100
Akron OH Energy Steam
U3lity
upgrade 








50,000,000
 150
Akron OH Energy Harold
K.
Stubbs
Building
‐
Police
Department
Rehabilitate
or
build
new
building
for
Police
Department 








40,000,000
 200
Akron OH Housing Addi3onal
demoli3on
work
on
Raymond
Mallison
Apartments 












150,000

Akron OH Housing Addi3onal
vehicle
fleet/replacement
with
fuel
efficient
models 










2,800,000

Akron OH Housing Capital
funds
for
Hope
VI
comple3on
due
to
drop
o
tax
credits 










1,000,000

Akron OH Housing Construc3on
funds
for
special
needs
housing
units
(par3al
costs) 










1,000,000

Akron OH Housing Replacement
garages
@
50
units 












750,000

Akron OH Housing Replacement
housing
units
20@20,000
inclusive
of
professional
serivces 












400,000

Akron OH Housing Scafered
site
housing
site
work
landscapping
500
units
@
2,000 










2,000,000

Akron OH Housing Security
technology‐cameras,
electric
locks 










1,000,000

Akron OH Housing Saferstein
Towers‐restore
historic
walls 












200,000
 4
Akron OH Housing Cofer
Building‐balcony
repair
and
waterproofing 












150,000
 5
Akron OH Housing Fleet
vehicles
replacement‐energy
conserva3on 












850,000
 6
Akron OH Housing Honey
Locust
Family
Apartments
parking
repair 












350,000
 6
Akron OH Housing Raymond
Mallison
apartments‐par3al
demo 












150,000
 6
Akron OH Housing Nimmer
Place
repair
retaining
wall 












150,000
 8
Akron OH Housing Edgewood
Village‐construct
commercial
space 










1,500,000
 10
Akron OH Housing Green
energy
audits
and
plans
for
buildings 












750,000
 10
Akron OH Housing Informa3on
technology
–new
system
for
asset
management 










1,500,000
 10
Akron OH Housing Various
office
building
renova3ons
due
to
age 










1,500,000
 10
Akron OH Housing Colonial
Hills
Family
Apartments‐interior
work 










2,500,000
 12
Akron OH Housing Senior
building
interior
replacement 










1,000,000
 12
Akron OH Housing Edgewood
Village
Hope
VI‐Phase
I
V‐public
streets 










1,000,000
 15
Akron OH Housing Edgewood
Village
Phase
V‐streets 










1,000,000
 15
Akron OH Housing Public
safety
upgrades‐various
sites 










1,000,000
 15
Akron OH Housing Washington
Square‐renova3ons
–
24
units 












800,000
 15
Akron OH Housing Edgewood
Village
housing
units 










2,000,000
 20
Akron OH Housing Edgewood
Village
Phase
V‐housing
units 










2,000,000
 20
Akron OH Housing Lauer
Senior
Building‐rehabilita3on
work 










3,000,000
 20
Akron OH Housing Nimmer
Place
Senior
Tower
interior
work 










4,000,000
 24
Akron OH Housing Various
replacement
housing‐single 










2,400,000
 25
Akron OH Housing Saferstein
Towers‐renova3on 










4,000,000
 30
Akron OH Public
Safety Byrne
and
Jus3ce
Assistance
Grant
–
To
purchase
addi3onal
cruisers
and
police
equipment 












500,000

Akron OH Public
Safety Police/Fire
Training
Center
Build
a
joint
facility
in
which
both
Fire
and
police
departments
can
provide
training
for
their
respec3ve

departments 








10,000,000

Akron OH Public
Safety Safety
Communica3ons
Project
–
Comple3on
of
county‐wide
communica3ons
system 










3,400,000

Akron OH Public
Safety COPS
Officers 










1,200,000
 15
Akron OH Schools McEbright
Elementary
School 










9,000,000
 60
Akron OH Schools Portage
Path
Elementary
School 










8,000,000
 60
Akron OH Schools Shumacher
Elementary
School 










9,000,000
 60
Akron OH Schools Windemere
Elementary
School 










9,000,000
 60
Akron OH Schools Hyre
Middle
School 








18,000,000
 75
Akron OH Schools Buchtel/Perkins
High
School 








30,000,000
 90
Akron OH Schools East/Goodyear
High
Schol 








28,000,000
 90
Akron OH Streets/Roads Brine
Mixing
Sta3on
and
Salt
Storage
Facility
at
Copley
Road
Depot
and
Evans
Ave.
facili3es 










1,500,000

Akron OH Streets/Roads Design
to
central
interchange
project 








50,000,000

Akron OH Streets/Roads Expressway
Ligh3ng
Maintenance 












400,000

Akron OH Streets/Roads I‐77
Landscaping
(Copley
Rd
–
S.R.
21) 












900,000

Akron OH Streets/Roads I‐77
Minor
Rehab
(Central
Interchange
‐
s.
corp.
line) 










6,950,000

Akron OH Streets/Roads In‐place
Asphalt
Recycle
Equipment
for
Two
Paving
Trains 










4,200,000

Akron OH Streets/Roads Install
Safelane
Deicing
Pavement
on
Expressway
Bridges 










6,000,000

Akron OH Streets/Roads Install
Safelane
Deicing
Pavement
on
Hills:

Merriman,
Portage
Path,
Smith
Road,
MemorialParkway,
Tallmadge

Avenue,
Eastland,
Clearview,
Brifain
Road,
Howard
Street 










5,500,000

Akron OH Streets/Roads New
Roadway
Access
to
Municipal
Service
Center
from
Kelly
Avenue 










1,000,000

Akron OH Streets/Roads Sidewalk/Ramp
Program 










4,000,000

City State Program Project
Descrip3on Funding
Required Jobs
Akron OH Streets/Roads Various
roadway
resurfacing 








15,000,000

Akron OH Streets/Roads School
Flasher
Paging
System
Citywide 












125,000
 2
Akron OH Streets/Roads Downtown
Wireless
Signal
Upgrade 












150,000
 4
Akron OH Streets/Roads Miscellaneous
Trafic
Control
Devices
citywide 














25,000
 4
Akron OH Streets/Roads Sign
Inventory
Management
System 










1,500,000
 4
Akron OH Streets/Roads Triplef
Blvd
Signals
Upgrade 












320,000
 4
Akron OH Streets/Roads Brifain
Road
Signals
Upgrade 










1,800,000
 5
Akron OH Streets/Roads Brown
Street
Signals
Road
upgrade 










1,100,000
 5
Akron OH Streets/Roads Connector
road
to
transit
center 










1,500,000
 5
Akron OH Streets/Roads Darrow
Road
Signals
upgrade 












840,000
 5
Akron OH Streets/Roads Home
Ave
Signals
upgrade 












600,000
 5
Akron OH Streets/Roads Kenmore
Blvd
Signals 












500,000
 5
Akron OH Streets/Roads W.
Exchange
signals 










1,800,000
 5
Akron OH Streets/Roads White
Pond
Infrastructure 










2,000,000
 5
Akron OH Streets/Roads Crouse
Street
–
Public
Improvements
in
Spicertown
to
support
University
Park
Alliance 












300,000
 6
Akron OH Streets/Roads Street
Name
Sign
Installa3on
and
Upgrade 












500,000
 6
Akron OH Streets/Roads Tech
Way
to
construct
a
cul‐de‐sac
at
the
end
of
Tech
Way,
including
sewer
and
water
main
improvements
for

Goodyear’s
future
development 












424,000
 7
Akron OH Streets/Roads Dover
Avenue,
et
al
Reconstruct
curb,
aprons,
and
sidewalk
where
necessary
resurface
Dover
Avenue
from

Diagonal
to
Bellevue
reconstruct
payment
on
Santee
Ave.,
East
Park
Blvd.
and
Genoa
Avenue 












230,000
 8
Akron OH Streets/Roads Park
East
Towpath
Bridge
and
Resurfacing 












650,000
 8
Akron OH Streets/Roads Waterloo
Road
Towpath
Trail 












400,000
 9
Akron OH Streets/Roads AES
Bartges
Towpath 












500,000
 10
Akron OH Streets/Roads Bartges
Street
Bridge
Replacement 










1,500,000
 10
Akron OH Streets/Roads Bicycle
Facili3es
Implementa3on 












300,000
 10
Akron OH Streets/Roads Train
Sta3on
Connector
Trail 












850,000
 10
Akron OH Streets/Roads Waterloo
Road
Signals
Upgrade 












580,000
 10
Akron OH Streets/Roads White
Pond
Office
Park‐grading 










4,000,000
 10
Akron OH Streets/Roads Cedar
Street
Signals
Upgrade 












750,000
 12
Akron OH Streets/Roads Market
Street
Improvements
(Rose
to
Portage
Path)
Roadway
Reconstruc3on,
waterline
replacement,
storm

sewer
installa3on 










1,600,000
 12
Akron OH Streets/Roads N.
Arlington
Signals
Upgrade 












860,000
 13
Akron OH Streets/Roads Massillon
Road
(Triplef
to
bridge
over
Lifle
Cuyahoga
River) 










5,000,000
 15
Akron OH Streets/Roads Tallmadge
Avenue
widening
roadway
reconstruc3on
and
widening,

waterline
replacement 










5,000,000
 15
Akron OH Streets/Roads Triplef
road
Improvements
(Hilbish
to
Seiberling) 










8,000,000
 15
Akron OH Streets/Roads W.
Market
Signals
Upgrade
(Highland
 












800,000
 15
Akron OH Streets/Roads Y‐Bridge
Fencing
and
Rehab
–
The
proposed
Y‐Bridge
Fence
project
will
design
and
construct
a
tubular
steel

decora3ve
panel
fence
along
the
east
and
west
sides
of
the
bridge.

Rehabilita3on
and
deck
overlay. 










5,000,000
 15
Akron OH Streets/Roads Brifain
Road
Bridge
over
Market‐Bridge
replacement
and
realignment 










8,000,000
 20
Akron OH Streets/Roads W.
Market
Signal
Upgrade
(Highland‐Summit) 










1,400,000
 20
Akron OH Streets/Roads Bridgestone‐roadway
construc3on 










1,000,000
 40
Akron OH Streets/Roads Biomedical
Corridor
grading
project 








12,000,000
 50
Akron OH Streets/Roads Goodyear
new
road
construc3on 










5,000,000
 50
Akron OH Streets/Roads Hickory
Street
to
improve
the
sec3on
of
Hickory
St.
between
North
St.
and
Memorial
Parkway 










5,000,000
 50
Akron OH Streets/Roads White
Pond
Drive 










7,000,000
 50
Akron OH Transit 20
less
than
30
foot
buses
Akron OH Transit Bus
shelters 












500,000

Akron OH Transit Fareboxes 










2,500,000

Akron OH Transit Geothermal
Hea3ng
and
Cooling 










1,500,000

Akron OH Transit Internal
server
replacement 












500,000

Akron OH Transit New
Back
up
Generator 










1,000,000

Akron OH Transit New
CNG
compressors 










2,000,000

Akron OH Transit New
smart
card
fare
system 












500,000

Akron OH Transit Next
Bus
Des3na3on
signs 










1,000,000

Akron OH Transit North
Akron
Park
and
Ride 










1,500,000

Akron OH Transit Opportunity
Park
South
Parking
Deck
provide
a
parking
compliment
to
the
Mul3model
Metro
Transit
Transfer

facility 








18,000,000

Akron OH Transit Rehab
administra3on
building
and
parking
lot 










2,000,000

Akron OH Transit Rehab
maintenance
lot 












500,000

Akron OH Transit Rehab
maintenance
lot 












500,000

Akron OH Transit Parking
Lot
south
of
Gojo
deck 












200,000
 6
Akron OH Transit Expansion
of
Ghent
Road
Park
and
Ride 










1,000,000
 10
Akron OH Transit Security
cameras
on
buses 










2,100,000
 10
Akron OH Transit Upgrade
Radio
and
safety
communica3ons
systems 










3,500,000
 10
Akron OH Transit Upgrade
scheduling
and
rou3ng
capability
for
paratransit
and
demand
response
service 










2,000,000
 10
Akron OH Transit Rebuild
maintenance
facili3es
and
buses
garages 










5,000,000
 15
Akron OH Transit 20
40‐foot
buses 










7,000,000
 20
Akron OH Transit Rehabilita3on
of
railroad
trackage
and
bridges 










5,000,000
 25
Akron OH Water Ac3on
Plan
Recommenda3ons
Equipment
Purchases 












200,000

Akron OH Water Annual
Sanitary
Sewer
Reconstruc3on 












550,000

Akron OH Water Bath
Road
Erosion
Control 












736,000

City State Program Project
Descrip3on Funding
Required Jobs
Akron OH Water Brewster
Creek
Channel
Restora3on 










3,500,000

Akron OH Water Cuyahoga
St.
Storm
Sewer
Dillion‐Cascade
Valley
Park‐
resolve
chronic
flooding
problems
full
improvements 










2,000,000

Akron OH Water Eastgate
Sewer
Reconstruc3on 










3,775,000

Akron OH Water Filter
Building
Instrumenta3on
&
Control
Upgrade 












650,000

Akron OH Water FirstEnergy
Deten3on
Pond 












120,000

Akron OH Water Lake
of
the
Woods
Pump
Sta3on 












805,000

Akron OH Water Main
Ouzall
Sewer
Rehabilita3on 












550,000

Akron OH Water Pigeon
Creek
Storm
Sewer
and
dredging

‐
resolve
chronic
flooding
problems
including
stream
restora3on,

deten3on
and
storm
sewers 










5,000,000

Akron OH Water Repair
of
main
valve
on
54"
force
main
to
insure
complete
closure. 












100,000

Akron OH Water Sanitary
Sewer
Reconstruc3on
2009 










1,720,000

Akron OH Water Storm
Water
U3lity
Plan
Development 












350,000

Akron OH Water Substa3on
Transformers
and
Switchgear
Replacement 










1,100,000

Akron OH Water Upgrade
of
DCS
supervisory
monitoring
and
control
system. 












600,000

Akron OH Water Ver3cal
Pushwall
Extension 










1,942,000

Akron OH Water Water
Main
repairs
of
48"
pipe
to
prevent
river
bank
failures. 












300,000

Akron OH Water Waterloo
Road
Wright
Sewer
JEDD 










1,500,000

Akron OH Water WPCS
Construc3on
of
flow
distribu3on
and
metering
devices. 












680,000

Akron OH Water Fairhill
Slope/Storm
Outlet
Repair 












300,000
 4
Akron OH Water First
Energy
Pond 












120,000
 4
Akron OH Water Force
Main
Valve
Replacement 












250,000
 4
Akron OH Water Large
Valve
Replacement
Program 












350,000
 4
Akron OH Water Misc
Storm
Water
2008 












503,000
 4
Akron OH Water Misc
Storm
Water
2009 










1,000,000
 4
Akron OH Water 2nd
Street
Pump
Sta3on 












500,000
 5
Akron OH Water Lake
of
the
Woods
Pump
Sta3on 












825,000
 5
Akron OH Water Middlebury
Phase
II 










1,200,000
 5
Akron OH Water Smith/Ghent
Deten3on
Green 










1,500,000
 5
Akron OH Water Filter
Media
Replacement 












125,000
 6
Akron OH Water Lagoon
Dredging 












500,000
 6
Akron OH Water Middleton
Road
Bolt
Reinforcement 










1,000,000
 6
Akron OH Water Northside
Interceptor
Rehab 










1,200,000
 6
Akron OH Water Sand
Run
Parkway
Lining
Sanitary
Sewer 










2,700,000
 6
Akron OH Water Tank
Farm
Security
Fencing
and
Gates 












350,000
 6
Akron OH Water Waste
Water
Primary
Roof
Replacement 












175,000
 6
Akron OH Water Water
Pump
Sta3on
Renova3ons 










1,000,000
 6
Akron OH Water Albrecht
Ave
JEDD
Water
Line 












740,000
 7
Akron OH Water JEDD
Water
Service
Extensions 










2,000,000
 7
Akron OH Water Cleveland
Massillon
Rd
JEDD
Sanitary
Sewer 












300,000
 10
Akron OH Water CSO
Separa3on
Projects 








15,000,000
 10
Akron OH Water Mill
Street
Sewer
Reloca3on 










2,400,000
 10
Akron OH Water Sanitary
Sewer
Reconstruc3on
2008 












825,000
 10
Akron OH Water Cleaning
and
Lining 










1,500,000
 12
Akron OH Water CSO
WPCS
Addi3on
Treatment 








16,000,000
 12
Akron OH Water Montrose
High
Service
Conversion
Rothrock 










1,400,000
 12
Akron OH Water Standby
Power
at
Water
Pump
Sta3ons 












300,000
 12
Akron OH Water Waste
Water
Influent
Screen
Rebuild 












200,000
 12
Akron OH Water Waste
Water
Influent
Screen
Rebuilt 












200,000
 12
Akron OH Water CSO
WPCS
Secondary
Expansion 










7,500,000
 15
Akron OH Water CSO
WPCS
Storage 








34,000,000
 15
Akron OH Water SCADA
Improvements 










1,000,000
 15
Akron OH Water Hudson
Water
System
Reinforcement 










2,000,000
 18
Akron OH Water Substa3on
Equipment
Replacement 










1,000,000
 18
Akron OH Water Tank
Pain3ng 










1,000,000
 18
Akron OH Water CSO
Northside
Tunnel
(Design
Only) 










4,600,000
 20
Akron OH Water CSO
Ohio
Canal
Tunnel
(Design
Only) 








14,000,000
 25
Akron OH Water Water
Main
Replacement 










5,000,000
 35
Akron OH Water Water
Storage
Clearwell 








15,000,000
 36
Brook
Park OH Streets/Roads Heatherwood
Drive
Reconstruc3on
‐
remove
and
replace
exis3ng
pavement,
replace
exis3ng
water
main,
up‐
grade
exis3ng
storm
and
sanitary
sewers 










1,625,000
 25
Brook
Park OH Water Ruple
Parkway
‐
Cedar
Point
Road
Water
Main
Replacement
‐replace
exis3ng
water
main
and
service

connec3ons
on
Ruple
Parkway
and
Cedar
Point
Road 










1,300,000
 15
Brook
Park OH Water Smith/Hummel
Sanitary
Sewer
‐
Phase
2
‐
install
54"
sanitary
sewer
on
Smith
Road
and
a
36"
sanitary
sewer
on

Hummel
Road,
includes
modifica3ons
to
the
Fry
Road
Pump
Sta3on
and
the
storage
chamber
on
Smith
Road.











2,865,700
 15
Canton OH CDBG Mahoning
Road
Corridor
Development
project 










8,000,000
 150
Canton OH Energy Green
Environmental
Solu3ons,
LLC 










2,500,000
 60
Canton OH Energy American
Made
Fuel‐Biodiesel 










3,700,000
 75
Canton OH Public
Safety Cook
Pharmica 










8,000,000
 135
Canton OH Water WRF
Waste
Conversion
Process 








32,500,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Cincinna3 OH Airport Lunken
Airport
Runway
and
Taxiway
sealcoat
and
paint 










1,200,000
 30
Cincinna3 OH CDBG LED
Traffic
Lights
to
update
signals
and
conserve
energy.

$100,000.

Installed
in
EZ
or
other
low
mod
areas.


One
half
FTE
construc3on
job
created. 












100,000
 0.5
Cincinna3 OH CDBG Blair
Ave.
tennis
courts.

$40,000.

In
EZ
neighborhood.

Short
term
construc3on
jobs. 














40,000
 1
Cincinna3 OH CDBG Laurel
&
Weaver
basketball
court.

$25,000.

In
HOPE
VI
Neighborhood
Revitaliza3on
Strategy
Area.

Short
term

construc3on
jobs. 














25,000
 1
Cincinna3 OH CDBG Over‐the‐Rhine
Pool
renova3on.

$1,200,000.

In
EZ.

Eight
FTE
construc3on
jobs
created. 










1,200,000
 8
Cincinna3 OH CDBG Addi3onal
Street
Paving/Rehabilita3on
above
normal
City
levels.

$2,000,000.

Likely
in
EZ,
Neighborhood

Revitaliza3on
Strategy
Areas,
or
other
low
income
neighborhoods.

Ten
FTE
construc3on
jobs
created. 










2,000,000
 10
Cincinna3 OH CDBG Liberty
Street
Traffic
and
Pedestrian
Improvements
in
the
Over‐the‐Rhine
low
income
neighborhood
are
 










1,000,000
 35
Cincinna3 OH CDBG The
Warsaw
Avenue
Streetscape
project
is
Phase
II
of
a
streetscape
in
support
of
the
new
full
service
grocery

store
in
East
Price
Hill,
a
low
income
neighborhood.

The
project
includes
new
street
realignment,
street
lights,

trees,
sidewalks 












600,000
 37
Cincinna3 OH CDBG The
12th
&
Vine
Streetscape
in
the
Over‐the‐Rhine
low
income
neighborhood
will
be
a
con3nua3on
of
the

Vine
street
Streetscape
and
will
fill
in
the
gaps
between
Vine
Street
and
previous
streetscapes
on
Jackson

Street.

 










1,145,000
 53
Cincinna3 OH CDBG MetroWest
Phase
II
project.

Total
costs
for
site
prepara3on
and
construc3on
of
a
60,000
square
foot
light

industrial
building
would
be
approximately
$6.8
million
that
would
create
80‐100
FTE
permanent
jobs.

Project

located
in
Lower
Price
Hill
neighbor 










6,800,000
 100
Cincinna3 OH CDBG Corryville
Public
Parking
structure.

Es3mated
cost
is
$4.5
million.

Project
enables
several
new
developments

in
the
2600
block
of
Vine
Street.
The
an3cipated
developments
include
a
movie
theater,
bowling
alley
and

family
style
sport
pub, 










4,500,000
 120
Cincinna3 OH CDBG New
Public
Street
for
Summit
Business
Park
in
the
Bond
Hill
neighborhood
which
is
a
low
mod
neighborhood.


This
project
will
construct
a
new
street
(name
to
be
determined)
to
access
the
exis3ng
Summit
Behavioral

Health
Facility 










1,000,000
 200
Cincinna3 OH CDBG Crosley
Building
project
renova3on
is
es3mated
at
$4,266,775.

A
minimum
of
300
FTE
jobs
are
an3cipated
to

be
created
in
the
redeveloped
industrial
building.

Project
located
in
Camp
Washington
neighborhood,
a
low

income
neighborhood. 










4,266,775
 300
Cincinna3 OH CDBG Dana
Avenue
Roadway
Improvements
in
the
Evanston
low
income
neighborhood

will
widen
and
improve
Dana

Avenue
in
support
of
new
academic
buildings
at
Xavier
University
and
a
new
mixed
use
development
by

Xavier/Corporex
called
Xavier
Square.

 










1,500,000
 480
Cincinna3 OH Energy Climate
Plan
Summit.

An
environmental/energy
conserva3on
Summit
focused
on
the
Business
and

Ins3tu3onal
community
















50,000
 1
Cincinna3 OH Energy Create
an
environmental
volunteer
(Conserva3on
Corps)
program













100,000
 1
Cincinna3 OH Energy Training
contractors
in
green
prac3ces













100,000
 1
Cincinna3 OH Energy Climate
protec3on/energy
conserva3on
awareness
and
involvement
campaign 












100,000
 2
Cincinna3 OH Energy High
Solar
Reflectance
Roofs.

Grants
for
high
SRIs 












100,000
 3
Cincinna3 OH Energy Residen3al
Energy
Efficiency.

Funding
for
basic
energy
improvements
for
residences
 










1,500,000
 7
Cincinna3 OH Energy Forest
Carbon
Sequestra3on.

A
plan
that
covers
the
plan3ng
of
17,000
trees;
complete,
tree
plan3ng
in
 










2,460,000
 25
Cincinna3 OH Energy Recyclebank.

Incen3ve
program
that
s3mulates
increased
recycling 










2,600,000
 60
Cincinna3 OH Energy Recycling
Carts.

Larger
carts
s3mulate
recycling
so
more
material
is
reprocessed 










8,102,645
 143
Cincinna3 OH Streets/Roads Engineering,
Plan
Prepara3on
and
Construc3on
of
Interconnec3on
Cable
for
the
City’s
Computerized
Traffic
 










3,500,000
 30
Cincinna3 OH Streets/Roads Central
Riverfront
Street
Grid.

New
street
network
to
improve
local
access
between
Cincinna3’s
Central
 










8,000,000
 112
Cincinna3 OH Streets/Roads City
Street
Network
Rehabilita3on
Program 








60,000,000
 900
Cincinna3 OH Transit Cincinna3
Streetcar
Network 






132,000,000
 150
Cincinna3 OH Water American
Red
Cross
Cincinna3
Headquarters
Building
Green
Infrastructure/Storm
Water
Control
‐
Installa3on

of
green
storm
water
management
controls
on
a
new
building
including
3200
square
feet
of
sloped
green
roof,

14,860
square
foot
bioinfiltra3on
syst 












299,600
 3
Cincinna3 OH Water Cincinna3
Public
Schools
–
Hartwell
Elementary
School
Green
Infrastructure/Storm
Water
Control
‐
Installa3on

of
green
storm
water
management
controls
at
a
new
building
including

8200
square
feet
of
pervious
concrete

in
parking
areas
and
bioinfiltra3on 












107,500
 3
Cincinna3 OH Water Cincinna3
Public
Schools
–
North
Avondale
Montessori
Green
Infrastructure/Storm
Water
Control
‐‐

Installa3on
of
green
storm
water
management
controls
at
a
new
building
including
1200
square
foot
green

roof
and
rain
barrels;
and
a
small
bioswale
with
und 














34,000
 3
Cincinna3 OH Water York
St.
&
Central
Ave.

Sewer
Replacement.

Shotcrete
repair
of
240
linear
feet
of
exis3ng
large
diameter

sewer
that
is
in
disrepair. 












319,000
 3
Cincinna3 OH Water Cincinna3
Public
Schools
–
Tab
High
School
Green
Infrastructure/Storm
Water
Control
‐‐
Installa3on
of
green

storm
water
management
controls
including
a
41,000
square
foot
green
roof
on
a
new
building 












655,800
 7
Cincinna3 OH Water Harwinton
Ln.
Sewer
Replacement.

This
is
a
WWIP
project
that
replaces
2,000
linear
feet
of
undersized
sewer

that
is
disrepair. 












836,000
 7
Cincinna3 OH Water Hengehold
2nd
Pump
Sta3on
Elimina3on.

Eliminate
Hengehold
PS

and
construct
1,500
linear
feet
of
sewer. 












551,000
 7
Cincinna3 OH Water Mill
Creek
WWTP
Aera3on
Tanks
Diffusers
Replacement.

This
project
replaces
the
exis3ng
diffusers
in
the

aera3on
tanks
at
the
mill
creek
WWTP
and
is
a
WPCLF
loan
fund
project. 










3,900,000
 7
Cincinna3 OH Water Placid
Meadows
Pump
Sta3on
Elimina3on.

Eliminate
Placid
Meadows
PS

and
construct
1,400
linear
feet
of

sewer. 












600,000
 7
Cincinna3 OH Water SSO
568
&
569
Improvements
–
Decrease
the
number
of
3mes
the
SSO
ac3vates.

This
project
replaces
4,200
linear
feet
of
pipe
that
is

undersized
and
removes
two
SSO’s. 










1,800,000
 7
Cincinna3 OH Water Greater
Cincinna3
Water
Works
Roof
replacements,
including
"green
roofs" 










1,195,000
 8.8
Cincinna3 OH Water Lifle
Miami
WWTP
Primary
and
Secondary
Rota3ng
Trough
&
Gates
Replacement.

Replace
the
primary
and

secondary
sefling
tanks,
inlet
gates,
and
scum
collec3on
trough
at
the
Lifle
Miami
wastewater
treatment

plant. 










6,171,000
 10
Cincinna3 OH Water Lifle
Miami
WWTP
Primary
and
Secondary
Tank
Rechaining.

Replace
the
primary
and
secondary
rechaining
at

Lifle
Miami
wastewater
treatment
plant. 








14,000,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Cincinna3 OH Water Foley
Forest
Pump
Sta3on
Upgrade,
Dellwood
Estates
&
North
Bay
Village
Pump
Sta3on
Elimina3ons
Ph.
2.


Consolidates
three
old
pump
sta3ons
into
one
new
pump
sta3on
and
construct
1,000
linear
feet
of
gravity

sewer
and
1,200
linear
feet
of
force
main. 










1,300,000
 11
Cincinna3 OH Water Winton
1
&
2
and
Sherwood
Pump
Sta3on
Consolida3on.

Consolidates
three
old
pump
sta3ons
into
one
new

pump
sta3on
and
construct
4,000
linear
feet
of
gravity
sewer
and
6,000
linear
feet
of
force
main. 










2,899,000
 11
Cincinna3 OH Water Greater
Cincinna3
Water
Works
Backup
power
&
system
storage 










8,056,000
 59.6
Cincinna3 OH Water Central
Riverfront
Park/bank
stabiliza3on/flood
control 








10,000,000
 74
Cincinna3 OH Water Greater
Cincinna3
Water
Works
Miller
Plant
Capacity
and
Treatment
Enhancement.

This
project
would
fund

ultraviolet
disinfec3on
system
powered
partly
by
solar
power
as
well
as
other
play
capacity
improvements. 








15,444,000
 114.3
Cincinna3 OH Water Greater
Cincinna3
Water
Works
System
enhancements
and
expansion 








20,576,083
 152.3
Cincinna3 OH Water East
End/Lunken
Levee
Rebuilding
Project 








35,000,000
 200
Cincinna3 OH Water Greater
Cincinna3
Water
Works

Asset
Management
and
infrastructure
replacement 








67,183,000
 497.2
Columbus OH Airport NetJets
Apron
Expansion
and
Taxiway
at
Port
Columbus 










4,400,000
 2800
Columbus OH Energy Central
Safety
Building
and
City
Hall
energy
efficiencies 










6,900,000

Columbus OH Energy CNG
Fueling
Sta3ons
and
CNG
Refuse
Trucks 










8,500,000

Columbus OH Energy Old
Police
Building
Renova3ons
and
Park 








26,000,000

Columbus OH Streets/Roads Alum
Creek
Bikeway
Trail 










3,000,000

Columbus OH Streets/Roads John
Glenn
Avenue
Reconstruc3on 










5,200,000

Columbus OH Streets/Roads Town
Street
Bridge
Demoli3on/Rich
Street
Bridge
construc3on 








10,000,000

Columbus OH Streets/Roads West
Bank
Park/Greenway
Connector 










2,000,000

Columbus OH Streets/Roads Downtown/River
South
Road
and
park
improvments 








20,000,000
 2000
Columbus OH Streets/Roads Emerald
Parkway/Sterling
Commerce
improvements 










1,000,000
 2000
Columbus OH Streets/Roads Na3onwide
Children's
Hospital
infrastructure
improvements 








25,000,000
 2500
Columbus OH Transit North
Corridor
Light
Rail
System 






200,000,000
 11000
Columbus OH Water 5th
Avenue
Dam
removal 










2,500,000

Columbus OH Water Lockbourne/Rickenbacker
Subtrunk 








20,000,000

Dayton OH Airport Dayton
Wright
Brothers
T‐Hangar
Project.
This
project
calls
for
the
demoli3on
of
exis3ng
aged
T‐Hangars
and

the
construc3on
and
development
of
new
hangars
to
support
general
avia3on
demands. 










3,000,000
 25
Dayton OH Airport Dayton
Interna3onal
Airport
Facility
Revitaliza3on
Project
‐
rehabilita3on
and
renova3on
of
old
US
Airways

reserva3on
call
center.
It
would
create
between
200‐300
full‐3me
permanent
posi3ons
within
a
2‐4
year

period. 












500,000
 50
Dayton OH Airport Dayton
Interna3onal
Airport
Hangar
Project
‐
construc3on
and
development
of
40,000
sq.
b.
spec
hangar 










6,500,000
 125
Dayton OH Airport LUDOP:
The
project
will
create
a
Land
Use
Development
Site
that
will
afract
new
businesses
to
the
airport
and

surrounding
communi3es,
s3mulate
the
job
market,
increase
non‐airline
revenues,
and
improve
the
aesthe3cs

around
the
Day3n
Interna3onal
Air 








10,600,000
 152
Dayton OH Airport Create
an
inter‐modal
hub
at
the
airport
using
rail,
air,
and
truck
distribu3on 








10,000,000
 353
Dayton OH CDBG Renova3on
of
Bomberger
Pool
which
was
built
in
1956.
Includes:
1)
Filling
the
diving
well,
reinforcing
the

perimeter
walls
with
shot
Crete
2)
Replacing
the
concrete
pool
deck
3)
Upgrading
or
installing
new
pumps,

piping
and
filtra3on
system
4)
Remodel
t 












350,000
 5
Dayton OH CDBG Youth
Employment
funding
to
support
summer
youth
employment
program
for
up
to
200
young
people
in

Northwest
Dayton 












350,000
 5
Dayton OH CDBG Miracle
Lane:
Construct
new
road
and
infrastructure
for
Miracle
Lane
redevelopment 












500,000
 13
Dayton OH CDBG Demoli3on
&
Cleanup
at
northwest
corner
of
Webster
St.
&
Monument
Ave. 












110,000
 16
Dayton OH CDBG Expansion
&
Renova3on
of
Northwest
Recrea3on
Center 










1,500,000
 22
Dayton OH CDBG IDCAST
Renova3on:
Rehabilitate
a
25,000
SF
warehouse
into
a
technology
laboratory
for
advanced
sensor

research.
The
project
would
create
an
addi3onal
53
technology
jobs
aber
comple3on. 












700,000
 26
Dayton OH CDBG The
Phoenix
Project:
Fairview
Commons:
Infrastructure
improvements
for
a
new
LEED‐cer3fied
civic
space.
The

Fairview
Commons
is
the
centerpiece
of
a
neighborhood
revitaliza3on
strategy
supported
by
Good
Samaritan

Hospital,
which
is
an
adjacent
employer. 










1,800,000
 26
Dayton OH CDBG New
and
expanded
parks
and
green
spaces
resul3ng
from
demoli3on
of
nuisance
housing 










3,000,000
 43
Dayton OH CDBG Revitalize
an
older
arts
district
by
making
infrastructure
improvements
to
increase
pedestrian
access
and

connec3vity
to
adjacent
areas 










3,000,000
 43
Dayton OH CDBG Expand
a
program
to
provide
job
training
and
documented
work
experience
for
hard
to
reach
popula3ons
on

infrastructure
projects 












500,000
 50
Dayton OH CDBG Restore
Historic
Structure
associated
with
Wright
Brothers 










3,500,000
 50
Dayton OH CDBG Tech
Town
Central
Park:
Construct
a
4‐acre
park
on
the
Tech
Town
Campus
designed
to
provide
open
space
for

a
30
acre
business
park 










3,750,000
 54
Dayton OH CDBG Miracle
Lane:
Develop/construct
mixed
use
anchor
development
at
Miracle
Lane
site 










4,500,000
 65
Dayton OH CDBG Delphi
(Home
Ave.)
Redevelopment 










5,000,000
 72
Dayton OH CDBG Technology
Union
Building:
Construct
a
65,000
SF
technology
building
on
the
Tech
Town
Campus.
The

Technology
Union
is
designed
to
promote
commercializa3on
of
emerging
technologies
by
housing
research

facili3es
adjacent
to
the
private
sector,
profit
mo3 










5,000,000
 72
Dayton OH CDBG Dayton
Interna3onal
Airport
Alterna3ve
Energy
Resource
Project:

The
project
will
consist
of
the
evalua3on,

selec3on
and
implementa3on
of

proposed
alterna3ve
energy
sources
that
will
help
the
Airport
and
Airport

Tenants
reduce
their
reliance
on
tra 










5,000,000
 125
Dayton OH CDBG Reposi3on
vintage
office
buildings
to
retrofit
space
to
accommodate
mixed
use
development 








10,000,000
 144
Dayton OH CDBG Construct
citywide
public
recrea3on
complex
that
is
"region‐class,"
that
is
compe3ve
with
recrea3on
facili3es

in
the
City's
suburbs.

This
would
be
the
first
new
public
recrea3on
complex
built
by
the
City
of
Dayton
in
over

30
years. 








13,000,000
 187
Dayton OH CDBG Infrastructure
improvements
for
redevelopment
adjacent
to
the
Central
Business
District
leveraging
our

riverfront
and
downtown
cultural
ameni3es
to
provide
unique
loca3ons
for
commercial
development. 










9,000,000
 318
Dayton OH Energy Miracle
Lane:
Incorporate
Geothermal
and/or
solar/alterna3ve
energy
into
anchor
development
building

design 












300,000
 6
Dayton OH Energy Hot
Water
Piping
Replacement
Project
at
Wastewater
Treatment
Plant 












690,000
 10
Dayton OH Energy Bio‐mass
infrastructure
for
Ofawa
Yards:
hea3ng
system
using
vegeta3on
for
fuel 










1,500,000
 22
City State Program Project
Descrip3on Funding
Required Jobs
Dayton OH Energy Development
of
Deconstruc3on
and
Construc3on
Waste
Recycling
Centers
to
reduce
the
amount
of
waste

3pped
into
landfills
and
to
provide
low
cost
recycled
products
to
the
community. 










2,500,000
 36
Dayton OH Energy Energy
retrofits
of
public
buildings
as
has
been
iden3fied
in
our
Honeywell
proposal. 










3,200,000
 46
Dayton OH Energy Automa3c
Meter
Reading
Implementa3on 










8,000,000
 50
Dayton OH Energy Tech
Town
Solar
Farm
for
Geothermal
Hea3ng:
Construc3ng
a
4‐acre
solar
farm
designed
to
provide
electricity

to
power
geothermal
pumps
to
heat
&
cool
3
new
buildings
in
Tech
Town.
Approximately
556
post‐construc3on

posi3ons
will
be
created
through
this 










3,500,000
 50
Dayton OH Energy Street
Maintenance
LEED
cer3fied
facility 










3,700,000
 53
Dayton OH Energy Dayton
Interna3onal
Airport
Alterna3ve
Energy
Resource
Project:
The
project
will
consist
of
the
evalua3on,

selec3on,
&
implementa3on
of
proposed
alterna3ve
energy
sources
that
will
help
the
Airport
&
Airport

Tenants
reduce
their
reliance
on
tradi3onal
sources 










5,000,000
 125
Dayton OH Public
Safety Automated
License
Plate
Readers 














85,000

Dayton OH Public
Safety Fiber
Op3cs
to
Districts 














15,000

Dayton OH Public
Safety Ini3a3ve
to
Reduce
Pros3tu3on‐Off
the
Streets
Program.
This
ini3a3ve
would
connect
individuals
involved
in

pros3tu3on
with
resources
to
leave
a
life
of
pros3tu3on.

Beginning
with
emergency
shelter
and
con3nuing

with
an
array
of
educa3onal 










1,500,000
 0
Dayton OH Public
Safety Problem
Oriented
Policing.

The
Dayton
Police
Department
is
integra3ng
Problem
Oriented
Policing
(POP)
into

the
way
law
enforcement
provides
services
to
the
community.

U3lizing
the
SARA
model
(Scanning,
Analyzing,

Responding,
Assessing)
as
the
method
f 












750,000
 0
Dayton OH Public
Safety Digital
Video
for
Marked
Cruisers 












450,000
 1
Dayton OH Public
Safety Community
Ini3a3ve
to
Reduce
Gun
Violence.
The
Community
Ini3a3ve
to
Reduce
Gun
Violence
program
is
a

mul3‐jurisdic3onal
and
mul3‐agency
mutual
effort
to
quickly
and
effec3vely
reduce
gun‐violence
and

associated
homicides.

 












750,000
 10
Dayton OH Streets/Roads Goodlow
Culvert
Replacement 














40,000
 1
Dayton OH Streets/Roads Brown
Street
Transporta3on
Enhancement 














70,000
 2
Dayton OH Streets/Roads North
Main
Street
widening
at
Helena
and
at
Fairview 












180,000
 6
Dayton OH Streets/Roads Old
North
Dayton
Enhancement 












170,000
 6
Dayton OH Streets/Roads Heid
Avenue
Widening 












275,000
 10
Dayton OH Streets/Roads Stewart
Street
Reconstruc3on,
Phase
1
(Main
to
paferson)
 












300,000
 11
Dayton OH Streets/Roads US‐35
Underpass
ligh3ng
improvements 












325,000
 11
Dayton OH Streets/Roads Downtown
Two‐way
street
Conversion 












350,000
 12
Dayton OH Streets/Roads Germantown
Street
Transporta3on
Enhancement 












350,000
 12
Dayton OH Streets/Roads Steve
Whalen
Boulevard
Bike
Path 












350,000
 12
Dayton OH Streets/Roads Stewart
Street
Reconstruc3on,
Phase
2
(Main
to
Brown) 












340,000
 12
Dayton OH Streets/Roads Wayne
Avenue
Transporta3on
Enhancement 












350,000
 12
Dayton OH Streets/Roads Keowee
Street
reconstruc3on 












400,000
 14
Dayton OH Streets/Roads Wright
Dunbar
Transporta3on
Enhancements 












400,000
 15
Dayton OH Streets/Roads Alley
Chip
Seal
Citywide 












500,000
 18
Dayton OH Streets/Roads Bridge
Street
Bridge
Replacement 












500,000
 18
Dayton OH Streets/Roads Miracle
Lane:
Construct
new
road
and
infrastructure
for
redevelopment 












500,000
 18
Dayton OH Streets/Roads Rosedale
Drive
Bridge
Replacement 












500,000
 18
Dayton OH Streets/Roads Hoover
Avenue
Culvert
Replacement 












700,000
 25
Dayton OH Streets/Roads Wright
Dunbar
Traffic
Calming
and
Sidewalk
improvements 












750,000
 26
Dayton OH Streets/Roads Concrete
Bus
Pads 










1,000,000
 35
Dayton OH Streets/Roads Helena
St.
Gateway 










1,000,000
 35
Dayton OH Streets/Roads Main
Street
Bus
Lanes 










1,000,000
 35
Dayton OH Streets/Roads Rehabilitate
and
repair
2
railroad
bridges
owned
by
the
City
of
Dayton
and
make
safety
enhancements 










1,000,000
 35
Dayton OH Streets/Roads Residen3al
Slurry
Seal
Citywide 










1,000,000
 35
Dayton OH Streets/Roads Webster
St.
Widening 










1,000,000
 35
Dayton OH Streets/Roads Downtown
Curb
&
Sidewalk
Replacement 










1,300,000
 46
Dayton OH Streets/Roads Great
Miami
Boulevard
Extension 










1,500,000
 53
Dayton OH Streets/Roads Traffic
Signal
Rebuilds,
PHases
7‐9 










1,940,000
 68
Dayton OH Streets/Roads Wheelchair
ramps 










2,000,000
 70
Dayton OH Streets/Roads Renewing
the
Urban
Forest‐
Storms
and
3me
have
taken
their
toll
on
the
city’s
street
trees,
which
reduce
the

urban
heat
island
effect
and
increase
neighborhood
property
values.
Funds
would
be
used
to
trim
and
remove

damaged
trees
and
plant
new
trees
alon 










5,000,000
 72
Dayton OH Streets/Roads Broadway
Bridge
over
Wolf
Creek 










4,000,000
 141
Dayton OH Streets/Roads Commercial
Corridor
Infrastructure
Revitaliza3on‐
streets,
sidewalks,
trees,
bury
overhead
u3li3es 










8,000,000
 282
Dayton OH Streets/Roads Asphalt
Resurfacing
for
thoroughfares
and
residen3al
streets 








19,000,000
 670
Dayton OH Transit Dayton
Interna3onal
Airport
Baggage
Screening
and
Security
Checkpoint
Reconfigura3on
Project
will
upgrade

the
Airport
Lobby
and
make
it
more
secure
for
the
TSA
Explosive
detec3on
equipment
and
reconfigure
the

security
checkpoint
area
for
more
efficienc 










1,250,000
 30
Dayton OH Transit Tech
Town
Transporta3on
Center 












925,000
 40
Dayton OH Transit Create
Logis3cs
&
Distribu3on
hub
near
US‐35/I‐75
interchange 










7,500,000
 108
Dayton OH Transit create
an
inter‐modal
hub
serving
truck
and
rail
for
distribu3on 








12,000,000
 172
Dayton OH Water Lucille
Storm
Sta3on
flapgate
Replacement 














90,000
 3
Dayton OH Water Elevated
Water
Storage
Tank
Pain3ng‐
Clean
and
recoated
interior
and
exterior
of
Burkhardt
Tank,
to
maintain

serviceability
of
potable
water
tank 












420,000
 6
Dayton OH Water Cleveland
Park
Sanitary
Sewer
Improvement 












200,000
 7
Dayton OH Water Environmentally
Friendly
Golf
Courses 












500,000
 7
Dayton OH Water Haverfield
Rd.
Sanitary
Sewer
Improvement 












186,000
 7
Dayton OH Water Fauver
Ave.
Sanitary
Sewer
Improvement 












250,000
 9
City State Program Project
Descrip3on Funding
Required Jobs
Dayton OH Water Miami
Valley
Hospital
Sanitary
Sewer
Upgrade
–
Install
a
new
sanitary
sewer
main
in
Wyoming
St.
to
handle

increase
sewer
flows
from
the
hospital. 












250,000
 9
Dayton OH Water Harvard
Blvd.
Storm
Sewer
Improvement 












300,000
 11
Dayton OH Water Mapping
a
Fix
to
Carbon
Emissions
Reduc3ons 










5,000,000
 15
Dayton OH Water Odor
Control
Measures
‐
Sealing
the
grit
and
primary
basins
with
bio‐filter
covers
to
eliminate
odors
from

coming
from
the
basins. 










5,000,000
 15
Dayton OH Water RecycleBank
Ini3a3ve
Program 










2,000,000
 15
Dayton OH Water Nicholas
Road
Water
Main
Replacement 












539,000
 19
Dayton OH Water Installa3on
of
a
storm
water
system
in
the
Source
Water
Protec3on
Area 










1,500,000
 53
Dayton OH Water Ofawa
Water
Treatment
Plant
–
replace
filter
media,
surface
wash
piping
and
ancillary
components
that
has

reached
its
service
life.
 










1,500,000
 53
Dayton OH Water Upgrade
water
infrastructure
to
the
Tech
Town
area,
which
is
a
Brownfield
undergoing
rehabilita3on 










1,500,000
 53
Dayton OH Water Replacement
of
obsolete
and
old
water
lines,
sanitary
sewer
lines,
and
storm
sewer
lines
in
Monument
Avenue

&
Webster
Streets 










2,000,000
 71
Euclid OH CDBG Euclid
Dog
Pound
Roof
Replacement 














70,000
 7
Euclid OH CDBG Euclid
Fire
Sta3on
3
Renova3ons
(kitchen
&
parking
improvements) 














70,000
 7
Euclid OH CDBG Euclid
City
Hall
Roof
Replacement 












385,000
 10
Euclid OH CDBG Euclid
Fire
Sta3on
1
Dorm
Renova3ons 












100,000
 10
Euclid OH CDBG Euclid
North
Street
Annex
Capital
Improvements 














70,000
 10
Euclid OH CDBG Euclid
Old
City
Hall
Improvements
‐
Exterior
Tuckpoint
&
ADA
 












120,000
 10
Euclid OH CDBG Euclid
Parks
and
Recrea3on
Department
Maintenance
Building
Rehab
‐
Roof
and
Windows 












100,000
 10
Euclid OH CDBG Euclid
Railroad
Rail
to
Trail
Project 












600,000
 10
Euclid OH CDBG Euclid
Sims
Park
Outdoor
Amphitheater
Improvements 












400,000
 10
Euclid OH CDBG Euclid
Citywide
Bicycle
Plan 












750,000
 15
Euclid OH CDBG Euclid
Streets
Department
Roof

&
Window
Replacement 












211,000
 15
Euclid OH CDBG Euclid
Citywide
WiFi
Project 










1,800,000
 20
Euclid OH CDBG Euclid
Memorial
Park
Master
Plan
Capital
Improvements 










3,000,000
 30
Euclid OH CDBG Construc3on
of
Euclid
Public
Safety
Center 








11,200,000
 70
Euclid OH CDBG Euclid
Recrea3on
Center 










9,000,000
 90
Euclid OH CDBG Euclid
Shore
Cultural
Center
Rehabilita3on
‐
Capital
Improvements 










9,000,000
 90
Euclid OH Energy Euclid
Joint
City/Library
Solar
Demonstra3on
Project 












475,000
 10
Euclid OH Energy Euclid
Joint
City/Library
Wind
Turbine
Demonstra3on
Project 












600,000
 10
Euclid OH Schools Euclid
City
Schools
Master
Plan
Implementa3on
‐
Phase
I
‐
New
Elementary
School
&
Football

Stadium/Complex 








67,000,000
 804
Euclid OH Streets/Roads East
204
Street/
Dille
Roadway
Project 












950,000
 9
Euclid OH Streets/Roads East
264
Street
Roadway
Project 










1,172,000
 11
Euclid OH Streets/Roads East
214
Street
Roadway
Project 










1,600,000
 16
Euclid OH Streets/Roads Downtown
Euclid
Phase
II
‐
Shore
Center
Drive,
Farringdon
Avenue,
East
228
Street,
Babbif
Road,
E222
Street

Roadway/Streetscape
Improvements 












824,300
 20
Euclid OH Streets/Roads St.
Clair
Resurfacing/Hydrant
Replacement
Project 










2,012,500
 20
Euclid OH Streets/Roads East
248
Street/Shorview
Roadway
Project 










2,146,800
 21
Euclid OH Streets/Roads East
222
Steet
Roadway
Project
‐
Phase
II 










2,520,700
 25
Euclid OH Streets/Roads Bruce
and
Crystal
Roadway
Project 










2,732,000
 27
Euclid OH Streets/Roads East
266
Street
Roadway
Project 










2,720,000
 27
Euclid OH Streets/Roads Citywide
Sidewalk
Replacement
Program 








15,000,000
 30
Euclid OH Streets/Roads East
191
‐
East
195
Roadway
Project 










3,132,000
 31
Euclid OH Streets/Roads Downtown
Euclid
Phase
III
‐
Interior
Municipal
Parking
Lot
Roadway/Streetscape
Improvements;
East
228

Extension 










1,736,510
 35
Euclid OH Streets/Roads Downtown
Euclid
Phase
I
‐
Lake
Shore
Boulevard,
Shore
Center
Drive
Extension,
Babbif/E222
Intersec3on

Roadway/Streetscape
Improvements 










8,613,070
 86
Euclid OH Streets/Roads Citywide
Street
Resurfacing
including
curb
replacement 








23,000,000
 230
Euclid OH Transit Downtown
Euclid
Bliss
Lane
Bus
Turnaround 












360,510
 12
Euclid OH Water Euclid
Memorial
Park
Waterline 










1,500,000
 15
Euclid OH Water Combined
Sewer
Overflow
Elimina3on
Program
Projects 








34,000,000
 340
Lakewood OH CDBG Madison
Park
Improvements 










1,000,000
 13
Lakewood OH CDBG City
Parking
Lots 










1,000,000
 15
Lakewood OH CDBG CDBG
Street
Repair
Program 










2,000,000
 18
Lakewood OH CDBG Lake
Erie
Recrea3onal
Pier 










2,000,000
 20
Lakewood OH CDBG Shoreline
Protec3on
and
Enhancement 










1,250,000
 25
Lakewood OH CDBG Downtown
Parking
Deck 










3,000,000
 145
Lakewood OH Streets/Roads W.
117th
St.
Curb
Repair 














75,000
 10
Lakewood OH Streets/Roads Sidewalk
Replacement 










2,000,000
 14
Lakewood OH Streets/Roads Traffic
Signal
Upgrade 












750,000
 15
Lakewood OH Streets/Roads Bunts
Rd.
Repair 










1,000,000
 18
Lakewood OH Streets/Roads Street
Repair
Program 








10,000,000
 30
Lakewood OH Water Interceptor
Sewer
Cleaning
and
Inspec3on 










3,000,000
 13
Lakewood OH Water WWTP
Class
"A"
Sludge
Project 










1,500,000
 13
Lakewood OH Water Manhole
Separa3on
Project 










5,000,000
 15
Lakewood OH Water Watermain
Replacement
Program 










2,500,000
 18
Lakewood OH Water Downspout
Separa3on
Program 








15,000,000
 25
Lima OH CDBG Trees 












500,000
 20
Lima OH CDBG Municipal
Center
accessibility
&
security
improvements 










1,000,000
 25
City State Program Project
Descrip3on Funding
Required Jobs
Lima OH CDBG Bellefontaine
Park 










2,000,000
 30
Lima OH CDBG Industrial
Park
Roads 










2,500,000
 30
Lima OH CDBG Park
Improvements 










2,000,000
 30
Lima OH CDBG Riverwalk
landscaping 










1,500,000
 30
Lima OH CDBG City
Parking
lot
improvements
with
storm
water
catchments
and
with
metered
spaces
for
electric
hybrids 










3,000,000
 40
Lima OH CDBG Riverwalk
Connectors 










1,900,000
 40
Lima OH CDBG Bellefontaine
Corridor 










3,200,000
 50
Lima OH CDBG Demoli3on 










3,000,000
 50
Lima OH CDBG Facade
improvements
on
Corridors 










2,000,000
 50
Lima OH CDBG Lima
Public
Library
renova3ons 










2,000,000
 50
Lima OH CDBG Lima
Trust
Historic
Renova3on 










2,000,000
 50
Lima OH CDBG S.
Main
Street
Corridor
improvements 










3,200,000
 50
Lima OH CDBG Sidewalks 










2,000,000
 50
Lima OH CDBG S3ppich
Building
Historic
Renova3on 










2,000,000
 50
Lima OH CDBG Allen
County
Museum
HVAC,
Electrical
and
systems
updates 










3,000,000
 75
Lima OH CDBG Southside
Grade
Separa3on 








11,000,000
 80
Lima OH CDBG Agile
Manufacturing
Ini3a3ve 








10,000,000
 100
Lima OH CDBG CBD
Renewal 










5,000,000
 100
Lima OH CDBG Eastside
Grade
Separa3on 








16,000,000
 100
Lima OH CDBG Hall
of
Jus3ce
renova3ons 








10,500,000
 100
Lima OH CDBG Lima
Stadium 










8,000,000
 150
Lima OH CDBG IGCC
Loan
Package 








50,000,000
 500
Lima OH Energy Fire
sta3ons
energy
retrofits 












500,000
 10
Lima OH Energy City
Building
Retrofits 










1,500,000
 30
Lima OH Energy LED
Streetligh3ng 










3,000,000
 30
Lima OH Energy Solar
Panels
for
Roobops 










2,000,000
 30
Lima OH Energy Steam
line
for
energy 










3,000,000
 30
Lima OH Energy Energy
Retrofits 










3,000,000
 40
Lima OH Energy Methane
capture/pipeline 










3,000,000
 40
Lima OH Energy Electric
U3lity/distribu3on 










4,000,000
 50
Lima OH Energy Reservoir
Windmills 










5,000,000
 50
Lima OH Energy Synthe3c
Gas
Research 








10,000,000
 100
Lima OH Energy Hybrid
Vehical
Purchase 










5,000,000
 200
Lima OH Energy Residen3al
energy
upgrades 










5,000,000
 200
Lima OH Energy Commercial
energy
upgrades 








10,000,000
 400
Lima OH Housing Energy
Upgrades 










4,000,000
 100
Lima OH Public
Safety Crime
Preven3on 












500,000
 10
Lima OH Public
Safety Technology,
e.g.,
radios,
cruiser
laptops,
etc. 










1,000,000
 10
Lima OH Public
Safety COPs 










2,000,000
 25
Lima OH Schools Energy
Upgrades 










5,000,000
 100
Lima OH Streets/Roads Comprehensive
Bike
Route 










7,500,000
 50
Lima OH Streets/Roads Sugar
St.
Connector 










6,500,000
 60
Lima OH Streets/Roads Arterial
Upgrades 










5,000,000
 75
Lima OH Streets/Roads Bridge
Restora3on 








10,500,000
 80
Lima OH Streets/Roads Rail
to
IGCC
site 








15,000,000
 100
Lima OH Streets/Roads General
Resurfacing 










5,000,000
 150
Lima OH Transit RTA
Rolling
Stock 










2,000,000
 15
Lima OH Transit School
Buses 










2,000,000
 15
Lima OH Transit EIS
for
High
Speed
Rail
Line 










2,200,000
 30
Lima OH Transit RTA
buildings,
shelters
&
facili3es 










2,000,000
 30
Lima OH Water South
end
Water
tower 










4,000,000
 25
Lima OH Water Charcoal
Filters 










5,000,000
 50
Lima OH Water Waterline
Renewals 








10,000,000
 50
Lima OH Water CSO/SSO
Projects 








10,000,000
 100
Lima OH Water Stormwater
Renova3ons 








10,000,000
 100
Lima OH Water Upground
Reservoir 








25,000,000
 100
Lima OH Water Wastewater
Treatment
Plant
replacements
and
improvements 








30,000,000
 200
Lorain OH CDBG Streetscape
renova3on
and
building
facade
improvements
in
shopping
district.

Streetligh3ng
improvements,

pedestrian
walkways,
police
crime
deterent
cameras
and
beau3fica3on
of
streetscape
through
plan3ngs.


Includes
replacement
of
18"
water
line. 










3,000,000
 20
Lorain OH Energy Wind
monitoring
sta3on
for
data
collec3on
for
installa3on
of
wind
turbines
on
land
and
water
based
turbines. 












100,000
 5
Lorain OH Energy Install
generators
on
city
land
fill
to
use
methane
for
power
genera3on. 










1,000,000
 10
Lorain OH Energy Install
wind
turbines
on
shoreline
to
power
municipal
power
needs 








25,000,000
 150
Lorain OH Public
Safety Neighborhood
surveilance
cameras
installed
in
crime
and
drug
problem
areas. 












250,000
 1
Lorain OH Public
Safety Vehicle
GPS
system
for
all
police
vehicles. 












300,000
 1
Lorain OH Public
Safety dash
cameras
for
80
police
units. 












500,000
 2
Lorain OH Public
Safety License
regogni3on
camera
equipement.

10
vehicles
. 












250,000
 2
Lorain OH Public
Safety re‐establish
gang
task
force
unit
with
the
hiring
of
5
police
officers. 












800,000
 5
Lorain OH Public
Safety Re‐
establish
street
crimes
unit.

Includes
hiring
of
10
officers
and
equipement. 










2,000,000
 10
Lorain OH Streets/Roads Mar3n's
Run
water
way
improvements
‐
Channel
deepening,
widening
and
banking
improvements.

Including

reten3on
pond. 










3,500,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Lorain OH Streets/Roads Cooper
Foster
Park
Road
widening
and
bridge
improvement
project. 










4,800,000
 25
Lorain OH Streets/Roads Jaeger
Road
improvemnt
project.

Road
widening,
storm
drainage,
bike
paths. 










5,500,000
 25
Lorain OH Streets/Roads Kolbe
Rd
reconstruc3on
consis3ng
of
road
improvements,
bike
lanes,
storm
improvements. 










1,500,000
 30
Lorain OH Transit Port
reconstruc3on
to
accomadate
a
bulk
and
break
bulk
shipping
port
including
rain
access
improvements. 








15,000,000
 45
Lorain OH Water Hamilton
water
line
replacement
‐
approx
1
mile
of
16"
line. 










1,500,000
 15
Lorain OH Water Inner
city
waterline
replacement
program. 










3,000,000
 15
Lorain OH Water 1
million
gallon
water
tower
construc3on
for
capacity. 










3,000,000
 20
Lorain OH Water Dunton
Rd.
Waterline
‐
main
line
from
reservoir
and
water
tower. 










1,000,000
 20
Lorain OH Water Construc3on
of
storage/conveance
tunnel
to
complete
findings
and
orders
for
SSO
program. 








30,000,000
 40
Lorain OH Water Regional
Waste
Water
Treatment
Plant.

Constructed
on
former
Brownfield
site
this
would
be
a
regional
facility

elimina3ng
mul3ple
discharge
permits.

Discharge
from
new
facility
would
be
u3lized
by
steel
making

opera3ons
for
cooling
water
or
discharge 






250,000,000
 300
Marion OH Airport Airport
terminal
building 










2,500,000
 50
Marion OH CDBG Mt
Vernon
Avenue
storm
relief
pipe 












500,000
 5
Marion OH CDBG Airport
ditch
enclosure 










1,500,000
 8
Marion OH CDBG Bellefon3ane
Avenue
Ditch
enclosure 










2,500,000
 10
Marion OH CDBG Columbia
Ditch
Enclosure 










3,000,000
 10
Marion OH CDBG Fairpark
Ditch
enclosure 










2,000,000
 10
Marion OH CDBG Generator
replacement‐city
hall
&
rec
center 












200,000
 10
Marion OH CDBG QuQua
Ditch
enclosure 










2,500,000
 10
Marion OH CDBG Blaine/Columbia
storm
relief
pipe 










4,000,000
 15
Marion OH CDBG Senior
Center
complex
improvements 










1,500,000
 20
Marion OH CDBG Recrea3on
storage
building 












500,000
 30
Marion OH CDBG Bike
path
loop‐CBD
to
rec
centers 










3,500,000
 40
Marion OH CDBG Replacement
swimming
pool 










3,000,000
 50
Marion OH Energy Replacement
roof
on
city
hall 












100,000
 8
Marion OH Energy Solar
Panels
for
city
buildings 










2,000,000
 30
Marion OH Public
Safety Pumper
truck
replacement
for
fire
service 












350,000
 2
Marion OH Public
Safety Security
cameras
in
CBD 










1,000,000
 3
Marion OH Public
Safety Replacement
roof/aprons
at
fire
sta3ons 












300,000
 6
Marion OH Public
Safety Replacement
fire
sta3on
for
S.
Prospect 










3,500,000
 50
Marion OH Streets/Roads Rehab
of
CDB
parking
lots 












750,000
 10
Marion OH Streets/Roads Forest
Street
replacement 










2,000,000
 12
Marion OH Streets/Roads Fairpark
addi3onal
street
replacement 










3,200,000
 15
Marion OH Streets/Roads Silver
Street
reconstruc3on 










5,000,000
 20
Marion OH Streets/Roads State/Prospect
service
road
reconstruc3on 










1,750,000
 20
Marion OH Streets/Roads Kenton
Avenue
grade
separa3on 








10,000,000
 40
Marion OH Streets/Roads Bellefontaine
Avenue
reconstruc3on 










7,000,000
 60
Marion OH Streets/Roads Delaware
Avenue
reconstruc3on 










7,000,000
 60
Marion OH Streets/Roads Center/Church
Streets
realignment 








10,000,000
 75
Marion OH Streets/Roads State/Propect
Streets
realignment 








10,000,000
 75
Marion OH Streets/Roads NE
&
SW
legs
of
city
outerbelt 








20,000,000
 100
Marion OH Streets/Roads Northwest
Industrial
Connector 








16,000,000
 150
Marion OH Transit Transit
terminal
building
replacement 












300,000
 15
Marion OH Water 1,100'
W.
Center
sewer
lining,
Ph
1 










2,200,000
 10
Marion OH Water 1,300'
Normandy/Virginia
sewer
replacement 










2,600,000
 10
Marion OH Water 2,300'
W.
Center
sewer
lining,
Ph
2 










4,600,000
 10
Marion OH Water Libsta3on
for
Dual
Rail
Industrial
Park 










2,000,000
 10
Marion OH Water Likens
Chapel
Road
sewer
replacement 










1,750,000
 12
Marion OH Water 3,400'
Columbia
sewer
lining 










6,800,000
 20
Marion OH Water Presiden3al
neighborhood
sewer
replacement 










4,500,000
 20
Marion OH Water CSO/SSO
abatement 










4,000,000
 50
Marion OH Water WWTP
sludge
management
improvements 










7,500,000
 60
Mentor OH CDBG Renovate
and
expand
Police
Department 










2,200,000
 50
Mentor OH Energy Install
energy
efficient
ligh3ng
throughout
City
facili3es 












100,000
 4
Mentor OH Energy Purchase
light
emiqng
diode
(LED)
traffic
signal
bulbs 












100,000
 4
Mentor OH Energy City
Hall
and
Ice
Arena
HVAC
upgrades 












500,000
 6
Mentor OH Energy Fire
sta3on
#3
Energy
Improvements 












200,000
 8
Mentor OH Public
Safety Add
3
police
officers 












255,000
 3
Mentor OH Streets/Roads Replace
600
linear
feet
of
bulkhead
walls
at
the
Mentor
Marina 












300,000
 4
Mentor OH Streets/Roads Repair/resurface
sidewalk
and
parapet
wall
on
Center
Street
bridge
over
CSX
railroad
tracks. 












350,000
 5
Mentor OH Streets/Roads Replace
undersized
culvert
carrying
the
Kellog
Creek
under
King
Memorial
Road 












138,000
 5
Mentor OH Streets/Roads Full
depth
concrete
repairs
to
various
streets
throught
the
City. 










1,000,000
 10
Mentor OH Streets/Roads Widen
and
resurface
Plains
Road
to
include
two
4'
bike
paths. 












670,000
 10
Mentor OH Streets/Roads Resurfacing
of
various
asphalt
streets
throughout
the
City 










1,000,000
 12
Mentor OH Streets/Roads Resurface
Tyler
Boulevard
from
SR
615
to
SR
306. 










3,000,000
 15
Mentor OH Streets/Roads Widen
Heisley
Road
from
2
lanes
to
4
lanes
from
Jackson
Street
to
Mentor
Avenue
(US
20) 










5,000,000
 20
Milford OH Water
Milford OH Water The
Garfield
Force
Main
Project
is
intended
to
eliminate
the
need
for
the
force
main
located
on
Race
Street

that
currently
runs
between
our
water
wells
#1
and
#2.
This
has
been
cited
as
a
serious
concern
by
the
EPA
.
It

will
alleviate
numerous
basement
fl 










1,326,650
 50
City State Program Project
Descrip3on Funding
Required Jobs
New
Bremen OH Streets/Roads Emergency
Generators
for
Water
Treatment
Plant
and
St.
Clair
Place
Sewer
Lib
Sta3on
(equipment
supply
and

installa3on) 












100,000
 2
New
Bremen OH Streets/Roads Canal
and
Cherry
Streets
Reconstruc3on
Projects 












750,000
 12
New
Bremen OH Streets/Roads Front
Street,
Rummel
Creek,
Melrose
Place,
S.
Walnut
Street,
Maurer
Place,
S.
Main
Street,
Sycamore
Street,
Kamman
Circle
and
N.
Franklin
Street
Asphalt
Resurfacing

Projects 












650,000
 15
North
Olmsted OH CDBG ADA
Updates
to
all
City
Buildings
and
Facili3tes:
Based
upon
a
study
already
performed,
all
City
buildings
and

facili3es
will
be
updated
to
current
ADA
standards 












393,059
 16
North
Olmsted OH Energy Three
Wind
Turbines:
Installa3on
of
three
turbines
that
will
provide
energy
to
City
and
School
facili3es 












250,000
 119
North
Olmsted OH Public
Safety Police
Sta3on
Improvements:
rehabilita3on
and
addi3on
to
the
exis3ng
City
of
North
Olmsted
Police
Sta3on 










2,000,000
 95
North
Olmsted OH Streets/Roads Pavement
at
Springvale
Golf
Course
and
Ballroom
Parking
Lot 














69,125
 3
North
Olmsted OH Streets/Roads Pavement
at
North
Olmsted
City
Hall
and
City
Service
Center
Parking
Lot 












176,000
 8
North
Olmsted OH Streets/Roads Root
Road
Cul‐De‐Sac:
Installa3on
of
a
city
standard
cul‐de‐sac
that
will
bring
the
street
to
current
standards 












180,000
 9
North
Olmsted OH Streets/Roads Columbia
Road/Lorain
Road
Intersec3on
Improvements:
Reconstruc3on
of
the
northwest
turning
radius
of
the

intersec3on
that
will
provide
a
safer
situa3on
for
truck
and
pedestrian
traffic 












375,000
 18
North
Olmsted OH Streets/Roads Sidewalk
Repair
Program:
Various
concrete
sidewalk
replacement
loca3ons
within
the
city. 












400,000
 19
North
Olmsted OH Streets/Roads Fitch
Road
Reconstruc3on:
Complete
rehabilita3on
by
means
of
asphalt
recycling
and
reclama3on
of
exis3ng

Fitch
Road 










1,012,581
 48
North
Olmsted OH Streets/Roads Dover
Center
Road
Reconstruciton:
Complete
rehabilitaion
of
Dover
Center
Road
including
pavement,
curbs,

sidewalks,
and
storm
sewers 










1,619,096
 77
North
Olmsted OH Water Holding
tanks
for
storm
water
in
sanitary
sewers 










5,000,000
 20
North
Olmsted OH Water North
Porter
Road
Water
Line
Replacement:
replacement
of
a
12"
D.I.W.M.
that
has
had
many
failures
over
the

past
8
years 












987,200
 47
North
Olmsted OH Water Walter
Road
Sewer
Relief:
Installa3on
of
an
underground
equiliza3on
sewer
that
will
help
prevent
sanitary

sewer
back‐ups
in
residents'
homes 










1,200,000
 57
North
Olmsted OH Water Moderniza3on
of
City
of
North
Olmsted
Waste
Water
Treatment
Plant:Complete
rehabilita3on
of
exis3ng

WWTP
bringing
it
to
today's
OEPA
standards 








30,000,000
 1425
North
Olmsted OH Water Drinking
Water
Change
to
Avon
Lake
Water:
Convert
municipal
water
supply
from
City
of
Cleveland
Water

Department
to
Avon
Lake
Water 








36,255,000
 1722
North
Royalton OH CDBG Service
Center 








13,000,000
 650
North
Royalton OH CDBG City
Hall 








20,000,000
 1000
North
Royalton OH Energy Farmers
Market 










3,000,000
 150
North
Royalton OH Energy Green
Retro
Fit 










5,000,000
 250
North
Royalton OH Energy Renewable
Energy
Facility 








13,500,000
 675
North
Royalton OH Housing Senior
Housing 








15,000,000
 750
North
Royalton OH Public
Safety Tornado
Warning
System 












250,000
 12
North
Royalton OH Public
Safety Police
Communica3on
Upgrade 










1,000,000
 50
North
Royalton OH Public
Safety Implementa3on
of
TLCI
Pedestrian
Program 










8,000,000
 400
North
Royalton OH Public
Safety Regional
Police
and
Fire 








12,000,000
 600
North
Royalton OH Schools Systemwide
Capital
Projects 






120,000,000
 6000
North
Royalton OH Streets/Roads Widening
of
Route
82 








28,000,000
 1400
North
Royalton OH Transit Enhanced
Transit
Wai3ng
Environment 












500,000
 25
North
Royalton OH Transit Bus
Turnaround
and
Kiosks 










3,000,000
 150
North
Royalton OH Water Wastewater
Plant 








10,000,000
 500
North
Royalton OH Water Sewer
Interceptor 








20,000,000
 1000
North
Royalton OH Water Regional
Storm
Water
Ini3a3ve 








40,000,000
 2000
Parma OH CDBG Ukrainian
Village
street
improvement 












300,000
 12
Parma OH CDBG Storefront
Renova3on
 












200,000
 80
Parma OH CDBG Ridge
Road
parking
improvement 










1,000,000
 100
Parma OH CDBG Fire
Department
Headquarters/Emergency
Opera3ons
Center/Regional
Dispatch
Center 








12,000,000
 300
Parma OH Public
Safety D.A.R.E.
program 












300,000
 3
Parma OH Public
Safety Parma
Technology
Improvement
Program
for
Police
Department/equipment 












200,000
 6
Parma OH Water Dentzler
sanitary
sewer
construc3on 










1,100,000
 25
Parma OH Water Grantwood/W.Ridgewood/Broadview
Rd.
sanitary
sewer
construc3on 










1,100,000
 25
Parma OH Water Manhafen
Ave
improvements 










1,245,830
 25
Parma OH Water Bradenton
sanitary
sewer 










2,600,000
 50
Parma OH Water Chevrolet
Blvd.
storm
water
deten3on
basin 










3,500,000
 50
Parma OH Water Citywide
sanitary
and
storm
sewer
construc3on/replacement 










4,620,000
 100
Parma OH Water Citywide
water
main
replacement 










4,950,000
 100
Sidney OH Public
Safety North
end
Fire
sta3on
‐
this
project
would
provide
a
fire
sta3on
to
the
fast
growing
north
end.
City
growth
in

this
area
has
made
fire
and
EMS
response
well
beyond
na3onally
accepted
standards.
This
sta3on
would
house

an
Engine
Co
and
an
EMS
unit. 










2,000,000
 12
Sidney OH Streets/Roads RUSSELL
ROAD
‐
St
MARYS
TRAFFIC
SIGNAL
UPGRADE:
This
work
will
involve
replacement
of
traffic
signals,

including
addi3onal
turn
lane
indicators.
The
new
design
will
incorporate
a
"box"
arrangement
versus
the

exis3ng
"diagonal"
span
wires.
 












152,000
 2
Sidney OH Streets/Roads INNER
CITY
ALTERNATIVE
TRUCK
ROUTE:
This
project
enlarges
three
City
interse3ons
(radii)
to
alllow
safer
and

more
efficient
truck
traffic
to
flow
around
the
downtown
business
district.
 












210,000
 4
Sidney OH Streets/Roads CONTRACT
RESURFACING:
The
City
of
Sidney
annually
resurfaces
City
streets
by
a
pavement
ra3ng

management
system.
This
work
includes
posible
asphalt
milling,
pavement
resurfacing,
pavement
markings,

u3lity
adjustments,
and
repair/replacement
of
curb
and
 












592,000
 10
Sidney OH Streets/Roads RUSSELL
ROAD
WIDENING,PHASE
II:
This
project
will
include
widening
of
Russell
Road
from
6th
Avenue
to

Vandemark
Road.
This
work
also
includes
the
replacement
of
a
2‐lane
to
a
4‐lane
bridge
over
Interstate
75.
 










3,800,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Sidney OH Water SIDNEY
INDUSTRIAL
WATER
TOWER
PROJECT:
Installa3on
of
a
1,000,000
gallon
Water
Tower
for
the
City's
west

side.
The
west
side
of
the
City
is
predominately
industrial
and
there
is
a
need
for
a
1,000,000
gallon
water

tower
to
improve
pressure
and
fire
flows 










3,500,000
 15
Sidney OH Water SIDNEY
WATER
SYSTEM
IMPROVEMENTS
PROJECT:
Water
Improvements
to
the
City's
Water
Distribu3on

System
to
meet
the
present
and
future
needs.
This
project
involves
the
installa3on
of
water
transmission

mains;
development
of
a
Lime
Sludge
Storage
Lagoon;
and 










6,000,000
 30
Sidney OH Water SIDNEY
WATER
SOURCE
PROJECT:
Sidney
obtains
a
majority
of
its
raw
water
supply
from
the
Great
Miami
River.

The
City
needs
to
find

an
alternate
water
source
because;
of
a
Mega‐Farm
within
our
watershed,
agriculture

run‐off
into
the
Great
Miami
River;
muni 








23,000,000
 90
Sidney OH Water SIDNEY
INDUSTRIAL
PARK
DEVELOPMENT:
This
project
would
make
252
acres
of
land
available
for
a
Mega‐
Industrial
site.
Installa3on
of
water
mains,
sewer
mains,
sewage
pump
sta3on,
drainage
and
road

improvements
is
necessary
to
prepare
this
site
for
future
 










4,608,000
 100
Stow OH Streets/Roads Seasons
Road
Improvement
Project
involves
the
complete
upgrade
of
Seasons
Road
for
6,500
feet.

This

roadway
will
serve
as
the
main
access
to
a
regional
economic
development
zone
and
is
necessary
for
the

immediate
construc3on
of
a
new
100
bed
hospital.

 










3,174,000
 6825
Stow OH Water Seasons
Road
Water
Line
Extension.

This
waterline
extension
will
provide
service
to
a
proposed
new
100
bed

hospital
that
will
serve
as
the
anchor
for
a
regional
economic
development
zone.
 












647,312
 4550
Stow OH Water Seasons
Road
Sanitary
Sewer
Line
Extension
is
necessary
to
provide
service
to
a
proposed
new
100
bed

hospital
that
will
serve
as
the
anchor
for
a
regional
economic

development
zone.
 










1,100,000
 6825
Strongsville OH Streets/Roads Foltz
Parkway
Extension.
This
project
consists
of
extending
our
exis3ng
industrial
parkway
approximately
3,200
feet
and
installing
curbs,

sidewalks,
storm
sewer,
sanitary
sewer
and
water
main.

This
will
create
access
to
182
acres
of
industrially

zoned
 










3,792,558
 100
Strongsville OH Streets/Roads Pearl
Road
(CUY‐42‐0.90)
Widening
Project.
This
project
consists
of
the
removal
of
approximately
one
mile
of
two
lane
asphalt
roadway
and
construc3ng
a

new
five
lane
concrete
highway,
sidewalk,
curbs
and
storm
sewer
and
replacing
all
major
culverts.
Pe 










5,678,000
 200
Toledo OH CDBG Game
Court
Reconstruc3on
‐
Reconstruct
exis3ng
game
courts
at
various
City
park
loca3ons. 












300,000
 4
Toledo OH CDBG Park
Infrastructure
Improvements
‐
Replace
and
repair
exis3ng
park
roads
and
parking
facili3es. 












500,000
 4
Toledo OH CDBG Wilson
Park
‐
Construct
neighborhood
walking
path
and
provide
general
site
improvements. 












165,000
 4
Toledo OH CDBG General
Park
Improvements
‐
Replace
picnic
tables,
benches,
signage,
miscellaneous
pavements,
address
ADA

compliance,
vandalism
issues,
and
other
site
improvements
at
various
City
parks. 












400,000
 5
Toledo OH CDBG Playground
Equipment
Replacement
‐
Replace,
repair
and
improve
neighborhood
playgrounds. 












450,000
 5
Toledo OH CDBG Interna3onal
Park
Riverfront
Walk
Replacement
‐
Interna3onal
Park
boat
basin
is
a
signature
element
on

Toledo’s
waterfront
landscape.

Original
construc3on
documents
could
be
u3lized
to
bid
and
reconstruct
the

boat
basin
pedestrian
walks
immediately.
 












500,000
 6
Toledo OH CDBG Bike
Path
Program
‐
Construct,
repair
or
replace
up
to
5
miles
of
bike
path
as
part
of
emerging
bike
path

system.

 










1,250,000
 8
Toledo OH CDBG Walbridge
Park
Riverfront
Access
Road
‐
Reconstruct
dilapidated
park
road. 










1,300,000
 8
Toledo OH CDBG Brand
Whitlock/Albertus
Brown
Roadway
Improvements 










4,000,000
 10
Toledo OH CDBG Promenade
Waterfront
Park
Reconstruc3on
Project
‐
Posi3oned
on
Toledo’s
riverfront
and
within
its
central

business
district,
Promenade
Park
has
long
played
a
vital
role
as
a
public
gathering
space
for
musical
events

and
fes3vals.

Built
over
30
years
a 










1,500,000
 12
Toledo OH CDBG New
Neighborhoods
‐
Energy
Efficiency 










4,000,000
 20
Toledo OH CDBG NSP
Streets 








10,000,000
 25
Toledo OH CDBG ACME
Plant 










8,000,000
 30
Toledo OH CDBG Main
Street
Streetscape 










5,000,000
 30
Toledo OH CDBG Public
Housing
Moderniza3on 








26,400,000
 120
Toledo OH Energy Methane
Gas
Produc3on
Wells 












174,000
 5
Toledo OH Energy Alternate
Fuel
for
Municipal
Vehicles 










1,000,000
 10
Toledo OH Energy Energy
Retrofit
Collins
Park
Water
Treatment
Plant
Using
Wind
Power 










1,000,000
 10
Toledo OH Energy Erie
Street
Market
solar
and
geothermal 










1,500,000
 10
Toledo OH Energy Marina
District
‐
Green
Energy 










2,000,000
 10
Toledo OH Energy Pipeline
Reloca3on 












550,000
 10
Toledo OH Energy Collins
Park
Wind
Turbine
Project 










2,000,000
 13
Toledo OH Energy Marina
Solar 










3,000,000
 15
Toledo OH Energy Swan
Creek
‐
Alterna3ve
Energy 










4,600,000
 20
Toledo OH Energy Fiberglas
Tower
solar
and
geothermal 










2,000,000
 25
Toledo OH Energy Municipal
Building
Retrofit
for
Energy
Efficiency 








18,000,000
 25
Toledo OH Energy Solar
Field 










5,000,000
 25
Toledo OH Energy New
Schools
New
Neighborhoods,
Energy
Efficient
Homes 










4,000,000
 30
Toledo OH Energy Fiberglas
Tower
‐
Energy
Efficiency 










3,000,000
 100
Toledo OH Energy Mega
Garage
Facility
with
Municipal/County/State 








25,000,000
 120
Toledo OH Energy University
of
Toledo
Scof
Park
Campus
‐
Advanced
and
Alterna3ve
Energy
Center 








35,000,000
 300
Toledo OH Energy University
of
Toledo
Scof
Park
Campus
‐
Alterna3ve
Energy
Genera3on 








40,000,000
 500
Toledo OH Public
Safety Vehicle
purchase 










1,000,000
 10
Toledo OH Public
Safety Computer
upgrade 










1,000,000
 12
Toledo OH Public
Safety COPS
hiring
grant 










2,000,000
 50
Toledo OH Streets/Roads Hill
Widening,
Reynolds
to
Holland‐Sylvania 












180,000
 1
Toledo OH Streets/Roads South
Ave.
Improvements,
Daniel
to
Spencer 












330,000
 2
Toledo OH Streets/Roads Dorr
Street
Improvements,
Reynolds
to
Holland‐Sylvania 












416,000
 3
Toledo OH Streets/Roads Sidewalks
Raised
by
Trees 












500,000
 3
Toledo OH Streets/Roads Arena
Street
Improvements 












610,000
 4
Toledo OH Streets/Roads Bancrob
St.
Improvements,
Reynolds
to
City
Limits 












573,000
 4
Toledo OH Streets/Roads Bridge
Project,
Crabb
Rd. 












550,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
Toledo OH Streets/Roads Brown
Stone
Improvements,
Southwyck
to
Reynolds 












636,000
 4
Toledo OH Streets/Roads Cheyenne
Improvements,
Heatherdowns
to
Southwyck 












655,000
 4
Toledo OH Streets/Roads Douglas
Rd.
Improvements,
Laskey
to
Alexis 












537,000
 4
Toledo OH Streets/Roads Hawley
Rd.
Improvements,
Western
to
Dorr 












640,000
 4
Toledo OH Streets/Roads Hill
Ave.
Improvements,
Bryne
to
Westwood 












575,000
 4
Toledo OH Streets/Roads South
Ave.
Improvements,
Detroit
to
Airport 












620,000
 4
Toledo OH Streets/Roads Starr
Improvements,
Belt
to
Corp
Line 












551,000
 4
Toledo OH Streets/Roads Bridge
Project,
Douglas
Road 












700,000
 5
Toledo OH Streets/Roads Matzinger
Ave.
Improvements,
Lint
to
Enterprise 












682,000
 5
Toledo OH Streets/Roads Nebraska
Improvements,
Westwood
to
RR
Tracks 












784,000
 5
Toledo OH Streets/Roads Suder
Ave.
Improvements,
Manhafan
to
Abygail 












682,000
 5
Toledo OH Streets/Roads Sylvania
Ave.
Improvements,
Phillips
to
Lagrange 












797,000
 5
Toledo OH Streets/Roads Monroe
Street
Improvements,
Detroit
to
Central 












906,000
 6
Toledo OH Streets/Roads South
Ave.
Improvements,
Reynolds
to
Byrne 












883,000
 6
Toledo OH Streets/Roads Bennef
Rd.
Improvements,
Sylvania
to
Alexis 










1,063,000
 7
Toledo OH Streets/Roads Bennef
Rd.
Improvements,
Sylvania
to
Alexis 










1,063,000
 7
Toledo OH Streets/Roads Bridge
Project,
Champion
Street 










1,000,000
 7
Toledo OH Streets/Roads Bridge
Project,
Collingwood 










1,000,000
 7
Toledo OH Streets/Roads Hill
Ave.
Improvements,
Westwood
to
Detroit 










1,122,000
 7
Toledo OH Streets/Roads Sign
Upgrade/Replacement 










1,000,000
 7
Toledo OH Streets/Roads Traffic
Signal
LED's 










1,000,000
 7
Toledo OH Streets/Roads Bridge
Project,
Marengo
Drive 










1,200,000
 8
Toledo OH Streets/Roads Summit
St.
Improvements,
Galena
to
Lasalle 










1,358,000
 9
Toledo OH Streets/Roads Collingwood
Ave.
Improvements,
Monroe
to
Cherry 










1,476,000
 10
Toledo OH Streets/Roads Detroit
Ave.
Improvements,
Penrose
to
Glanzman 










1,616,000
 11
Toledo OH Streets/Roads Michigan
St.
Improvements,
Lafayefe
to
Madison 










1,690,000
 11
Toledo OH Streets/Roads Bancrob
St.
Improvements,
Secor
to
Upton 










1,743,000
 12
Toledo OH Streets/Roads Hill
Ave.
Improvements,
Reynolds
to
Byrne 










2,000,000
 13
Toledo OH Streets/Roads Roadway
Preventa3ve
Maintenance
Phase
1
‐
2009 










2,000,000
 13
Toledo OH Streets/Roads Roadway
Preventa3ve
Maintenance
Phase
2
‐
2010 










2,000,000
 13
Toledo OH Streets/Roads Downtown
Two‐Way
Street
Conversions 












450,000
 15
Toledo OH Streets/Roads Arena/Stadium
Pedestrian
Malls 










2,500,000
 17
Toledo OH Streets/Roads Marina
District
Pedestrian
Malls 










3,000,000
 20
Toledo OH Streets/Roads Southwyck
Blvd.
Improvements,
En3re
Road 










4,000,000
 27
Toledo OH Streets/Roads Chevron
Property 










1,000,000
 30
Toledo OH Streets/Roads Marina
Dis3ct
Road 










3,000,000
 30
Toledo OH Streets/Roads Secor
Road
Improvement,
Monroe
to
Laskey 










4,500,000
 30
Toledo OH Streets/Roads Wheelchair
Ramps 










4,500,000
 30
Toledo OH Streets/Roads Front
Street/Miami
Improvements 










7,165,000
 48
Toledo OH Streets/Roads Front
Street 










9,200,000
 50
Toledo OH Streets/Roads Swan
Creek
Road
Improvements 










4,830,000
 50
Toledo OH Streets/Roads Intermodal
Connec3on
Road 








10,000,000
 100
Toledo OH Streets/Roads Swan
Creek
Bridges 








11,500,000
 100
Toledo OH Transit Burger
Street/Hecklinger
Pond
Embankment 












150,000
 1
Toledo OH Transit Bridge
Pain3ng 












600,000
 4
Toledo OH Transit Ofawa
River
Road
Embankment 












550,000
 4
Toledo OH Transit Cullen
Park
Dredging 












850,000
 6
Toledo OH Transit Marina
at
Marina
District 










3,500,000
 15
Toledo OH Transit Airline
Yard 










3,000,000
 25
Toledo OH Transit Swan
Creek
Amphitheatre 










7,590,000
 25
Toledo OH Transit Swan
Creek
Docks 










4,025,000
 25
Toledo OH Transit Swan
Creek
Pedestrian
Mall 










1,150,000
 25
Toledo OH Transit Ofawa
River
Dredging 










4,500,000
 30
Toledo OH Transit Swan
Creek
Pedestrian
Bridges 










3,220,000
 30
Toledo OH Transit Swan
Creek
Marina
Terminal 










4,325,000
 40
Toledo OH Transit Chevron
Property
Rail 










5,000,000
 50
Toledo OH Transit Swan
Creek
Stabiliza3on 








10,580,000
 80
Toledo OH Transit Swan
Creek
Canal 








11,500,000
 110
Toledo OH Water Dead
End
Water
Mains 












200,000
 1
Toledo OH Water Dexter
Alley
Sanitary
Sewer 












160,000
 1
Toledo OH Water Minor
Storm
Drainage
Improvements 












200,000
 1
Toledo OH Water Crabb
Rd.
Bridge 












300,000
 2
Toledo OH Water Large
Diameter
Sewer
Rehabilita3on 












239,000
 2
Toledo OH Water Dearden/Birdsall
Sanitary
Sewer 












428,391
 3
Toledo OH Water Point
Place
Dike 












400,000
 3
Toledo OH Water Delaware
Creek
Drainage
Improvement 












700,000
 5
Toledo OH Water Delaware
Creek
SSO
Elimina3on 












750,000
 5
Toledo OH Water Williams
Ditch
Improvements 












700,000
 5
Toledo OH Water Op3mist
Park
Drainage 










2,200,000
 10
Toledo OH Water Southwyck
Infrastrucutre 










1,500,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Toledo OH Water Water
Main
Replacement
Program 










2,000,000
 13
Toledo OH Water Dorr
St.
24"
Main
Replacement 










2,100,000
 14
Toledo OH Water Marina
District
Improvements 










2,000,000
 15
Toledo OH Water Swan
Creek
Infrastructure 










4,300,000
 50
University
Heights OH CDBG Purchase
and
renova3on
of
foreclosed
and
vacant
houses 










1,000,000

University
Heights OH CDBG Repair
and
resurfacing
of
several
heavily
traveled
streets 












500,000

University
Heights OH CDBG Repair
and/or
replacement
of
sidewalk
curbs,
driveway
aprons 












400,000

University
Heights OH CDBG Restore
funding
for
low‐moderate
income
residents
to
repair
homes 












200,000

University
Heights OH Housing Construc3on
of
addi3onal
affordable
housing
allowing
growing
numbers
of
senior
ci3zens
to
remain
in

community 












500,000
 18
University
Heights OH Public
Safety New
police
sta3on
for
32
officers
to
replace
original
sta3on
built
in
1948
for
12
officers 










5,000,000

University
Heights OH Public
Safety 911
equipment
replacement 














85,000
 0
University
Heights OH Public
Safety Communica3ons
equipment 














30,000
 0
University
Heights OH Public
Safety Replace
3
police
vehicles 














78,000
 0
University
Heights OH Public
Safety Taser
nonlethal
weapons
system 














36,000
 0
University
Heights OH Public
Safety Replace
all
regulatory
signs
with
reflec3ve
material,
per
federal
mandate 














46,000
 1
University
Heights OH Streets/Roads Improvement
on
South
Belvoir
Boulevard 










1,500,000
 10
University
Heights OH Streets/Roads Reconstruc3on
of
main
east‐west
artery,
Silsby
Road 










2,000,000
 10
University
Heights OH Transit Purchase
one
12‐passenger
van
for
senior
ci3zen
travel
requirements 














40,000

University
Heights OH Transit Purchase
second
van
to
replace
one
with
120,000
miles 














40,000

University
Heights OH Water Annual
sewer
replacement
and/or
repairs 












300,000
 5
University
Heights OH Water Citywide
cleaning
and
TV
of
sewers 












300,000
 5
University
Heights OH Water Saybrook
Road
sewer
replacement 












500,000
 5
Warren OH CDBG Municipal
parking
garage
rehab 












450,000
 9
Warren OH CDBG Packard
Music
Hall
Parking
lot
Resurfacing
&
Expansion
project. 












420,000
 20
Warren OH CDBG Packard
Music
Hall
Boiler
Room
Project
‐
replace
two
original
1955
boilers
with
energy
star
rated
boilers
and

energy
control
system. 












365,000
 25
Warren OH CDBG Parking
garage
access
connector 










1,450,000
 29
Warren OH CDBG Downtown
Business
Incubator
Project 










1,700,000
 34
Warren OH CDBG Packard
Music
Hall
public
elevator
project
‐
access
to
balcony
level
‐
ADA 












900,000
 35
Warren OH CDBG Packard
Music
Hall
‐
freight
elevator,
stage
updates,
office
renova3ons,
$
electrical
upgrades. 












626,647
 55
Warren OH CDBG Packard
Music
Hall
HVAC
System
replacement
project
‐
energy
star
air
handlers,
chillers,
water
tower;

plumbing,
pumps,
etc. 










1,329,595
 65
Warren OH Energy Biosolids
Improvement
Project...Installa3on
of
a
Gassifica3on/Pyrolysis
system
that
will
convert
wastewater

sludge
into
renewable
electrical
engery
genera3ng
15MW/day,
crea3ng
residual
bunker
oil
that
can
be
refined

to
disel
fuel
and
reduce
the
facili 










6,500,000
 30
Warren OH Public
Safety Crime
Detec3on
Cameras
‐
install
ten
cameras
in
high
crime
loca3ons
that
will
remote
back
to
a
visual

command
center. 










1,300,000
 6
Warren OH Streets/Roads Griswold
Street
Reconstruc3on 










1,000,000
 10
Warren OH Streets/Roads High
Street
Resurfacing 










1,000,000
 10
Warren OH Streets/Roads Niles
Road
Resurfacing 










1,000,000
 10
Warren OH Streets/Roads Mahoning
Avenue
Resurfacing 










1,500,000
 15
Warren OH Streets/Roads Park
Avenue
Resurfacing 










1,500,000
 15
Warren OH Streets/Roads City
Wide
Street
Resurfacing 










2,000,000
 20
Warren OH Streets/Roads Elm
Road
Resurfacing 










2,500,000
 25
Warren OH Streets/Roads Parkman
Road
Phase
2 










2,500,000
 25
Warren OH Streets/Roads Warren
Greenway
Bike
Trail 










4,000,000
 40
Warren OH Streets/Roads Parkman
Road
Phase
3 










6,500,000
 65
Warren OH Water Coit
Drive
Improvements
Stormwater
improvement
project
to
reduce
flooding
that
will
include
the
installa3on
644
linear
feet
of
new

storm
sewer. 












153,000
 10
Warren OH Water Interceptor
Cleaning
and
Repair...
12,000
linear
feet
will
be
rehabilitated 










1,000,000
 10
Warren OH Water Millikin
Place
and
Altan3c
Street
Stormwater
Upgrade
Stormwater
improvement
that
will
upgrade
the
exis3ng
storm
sewer
system
and
improve
the
inlet
capacity
of

the
exis3ng
drain
by
extending
an
18
inch
storm
sewer
along
the
drainage
channel
and
add
an 












402,000
 10
Warren OH Water Eastland
Area
Drainage
Improvements
Stormwater
improvement
that
will
upgrade
and/or
replace
2,054
linear
feet
of
storm
sewer
and
add
8
new

catch
basins. 












396,250
 15
Warren OH Water Golf
Drive
and
Trumbull
Country
Club
Stormwater
Upgrade‐

Stormwater
improvement
project
including
2
deten3on
basins
one
with
a
capacity
of
4.2
acre‐feet
and
one

with
the
capacity
of
6.2
acre‐feet,
replacement
of
600
linear
feet
of
exis3ng
15"
storm
sew 












790,000
 15
Warren OH Water Tod
Avenue
Stormwater
Upgrade
Stormwater
improvement
that
will
1,500
linear
feet
of
new
storm
sewer 












421,000
 15
Warren OH Water 422
Pump
Sta3on
Project
‐
Enable
the
City
to
enhance
pumping
pressures
along
the
422
corridor 










1,500,000
 20
Warren OH Water Enterprise
Drive
One
Million
Gallon
Storage
Tank
Project 










2,500,000
 20
Warren OH Water 480
Volt
Elec3cal
Switch
gear
project
‐
Upgrade
electric
service
to
Filtra3on
Plant
to
allow
for
increased

pumpage
requirements 










2,000,000
 25
Warren OH Water DAF
Replacement
Project

Removal
of
exis3ng
DAF
system
with
the
replacement
by
Gravity
Belt
Thickners. 










2,000,000
 25
Warren OH Water Wastewater
Headworks
Improvement
Project...replace
exis3ng
screeners
and
grit
removal
system 










2,500,000
 30
Warren OH Water Waterline
Replacement
Project
‐
100,000
linear
feet
of
12"
iron
duc3le
pipe.
This
project
will
promote
and

allow
for
future
growth
and
development 








15,000,000
 100
Warren
 OH CDBG Road
construc3on
Water
and
Sewer
improvements 










7,000,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Westlake
 OH Streets/Roads
Westlake
 OH Streets/Roads
Westlake
 OH Streets/Roads "Canterbury
Estates
Rehabilita3on"
this
project
includes
the
removal
and
the
replacement
of
a
dilapitated

water
distribuqon
system,
the
rehabilita3on
of
the
drainage
system
and
the
reconstruc3on
of
the
raodway

network.
This
project
is
the
final
phase 










3,100,000
 110
Westlake
 OH Streets/Roads "Hilliard
Blvd
Widening
Phase
2"
Hilliard
Blvd
is
a
major
east/west
Street
requiring
widening
from
two(2)lanes

to
five(5)
lanes,
including
new
watermains
and
sewers.
These
improvements
will
greatly
improve

sabey
of
the

roadway
and
create
&
retain
jobs.
 










4,000,000
 150
Westlake
 OH Streets/Roads "Clague
Road
Rehabilita3on"
This
project
includes
the
removal
and
replacement
of
the
roadway,watermains

and
storm
sewers
on
Clauge
Road.
This
infrastructure
dates
back
to
the
1920's.
This
roadway
is
the
major

north/south
connector
from
I‐90
to
I‐480
in
e 










4,000,000
 160
Youngstown OH CDBG Implementa3on
of
Landlord
registra3on
program 












250,000
 10
Youngstown OH CDBG Removal
of
neighborhood
Slum/Blight 










2,000,000
 100
Youngstown OH CDBG Expansion
of
Youngstown
Ini3a3ve
Economic
Development
Programs 










2,500,000
 400
Youngstown OH Housing Comple3on
of
Youngstown
Metropolitan
Housing
Authority
HOPE
VI
Project 










1,100,000
 150
Youngstown OH Public
Safety Expansion
of
Community
Policing
Program
‐
Hire
addi3onal
officers 










1,000,000
 25
Youngstown OH Public
Safety Purchase
new
police
crusiers 












600,000
 25
Youngstown OH Public
Safety Purchase
of
Gunshot
Loca3on
System 










1,500,000
 50
Youngstown OH Streets/Roads Wick
Ave.
Resurfacfing
&
Safety
upgrades 












650,000
 75
Youngstown OH Streets/Roads SR
7/62/170/Market
St./Glenwood
Ave./South
Ave/
Resurfacing 












600,000
 100
Youngstown OH Streets/Roads Hazel
Street
Roadway
Extension 










1,500,000
 200
Youngstown OH Transit Citywide
Signaliza3on
Upgrades 










1,000,000
 100
Youngstown OH Water Wastewater
Treatment
Plant
Repairs 










1,500,000
 75
Youngstown OH Water Kirkmere
Sanitary
Sewer
Repairs 










1,100,000
 80
Zanesville OH Energy Installa3on
of
Varma3c
LightMaster
Products
on
all
city
street
ligh3ng. 












200,000
 75
Zanesville OH Streets/Roads 2009
City
Wide
Overlays
This
project
consists
of
18
miles
of
road
resurfacing
and
5400
feet
of
water
lines
replacement.

The
project

would
create
a
minimum
of
30
jobs
associated
with
construc3on
contracts
to
perform
the
work.

The
city
has

received
$816 












590,597
 30
Zanesville OH Streets/Roads State
Route
93
Turn
Lane
This
project
consists
of
the
construc3on
of
a
turn
lane
on
SR
93
that
will
access
a
new
entrance
into
the

EastPointe
Business
Park
as
part
of
the
Master
Plan
for
the
expansion
of
the
Job
Ready
Site
that
is
es3mated
to

add
over
 










1,244,968
 2500
Zanesville OH Transit JRS
Rail
Spur
Extension
This
project
consists
of
the
construc3on
and
installa3on
of
11,131.51
LF
of
rail
to
service
the
Job
Ready
Site

which
is
es3mated
to
add
over
2,000
jobs
when
completed
and
cer3fied
in
December
2009.
 










2,342,058
 2000
Zanesville OH Water CSO
R‐13
Sewer
Separa3on
Project
This
project
will
eliminate
CSO
(Combined
Sewer
Overflows)
R‐13
by
separa3ng
the
sanitary
and
storm
sewers.


The
project
has
been
mandated
by
the
Ohio
EPA
to
be
a
part
of
the
City
of
Zanesville’s
Long
Term
Control
Plan.













385,000
 25
Zanesville OH Water CSO
R‐17
&
CSO
R‐19
Sewer
Separa3on
Project
This
project
will
eliminate
CSO’s
(Combined
Sewer
Overflows)
R‐17
and
R‐19
by
separa3ng
the
sanitary
and

storm
sewers.

The
project
has
been
mandated
by
the
Ohio
EPA 












227,000
 25
Zanesville OH Water CSO
R‐21
High
Water
Protec3on
Project
This
project
will
provide
protec3on
of
CSO
(Combined
Sewer
Overflow)
R‐21
from
impacts
of
high
water
levels

of
the
Muskingum
River.

The
project
has
been
mandated
by
the
Ohio
EPA
to
be
a
part
of
the
City
of
Zanesville.















30,000
 25
Zanesville OH Water Tileston
Avenue
Drainage
Project
This
project
will
provide
improved
drainage
and
flood
protec3on
for
a
low
to
moderate
income
area
of
the
City

of
Zanesville.

The
project
will
consist
of
approximately
2000
feet
of
24
inch
storm
sewer
and
appurtenances.














260,000
 25
Zanesville OH Water 
Wayne
Avenue
Waterline
Project
This
project
will
replace
a
deficient
water
main
and
provide
improved
fire
protec3on
along
Wayne
Avenue
prior

to
a
street
resurfacing
project.

The
project
will
consist
of
approximately
7200
feet
of
8
inch
water
main

 












510,000
 30
Zanesville OH Water The
EastPointe
Sanitary
Expansion
This
project
consists
of
the
construc3on
and
installa3on
of
2
lib
sta3ons,
approximately
11,650
LF
of
gravity

sanitary
sewer
and
approximately
13,650
LF
of
sanitary
force
main.
This
project
will
increase
the
capacity 










2,347,369
 500
Zanesville OH Water Water
Treatment
Plant
Upgrade:
This
Project
consists
of
the
construc3on
of
a
new
10
MGD
manganese
and
iron
removal
water
treatment
plant.

This
plant
is
cri3cal
to
the
economic
and
popula3on
growth
of
Zanesville
and
surrounding
area
as
the
exis3ng

pla 










9,000,000
 500
Zanesville OH Water New
Backwash
Waste
Line

This
Project
is
a
separate
component
of
the
new
water
treatment
plant.
Using
a
crew
of
up
to
6
full
3me

employees,
the
City
will
construct
a
12
inch
backwash
waste
line,
approximately
3500
feet
long,
from
the
water

treatment
plant 












164,000
 2000
Edmond OK Streets/Roads The
Oklahoma
Department
of
Transporta3on
is
currently
improving
Broadway
Extension
between
I‐44
and
the

City
of
Edmond.

The
improvements
include
the
interchange
with
Memorial
Road
and
Kelley
Avenue.


Construc3on
on
this
project
began
in
August
2008
 








10,000,000
 100
Midwest
City OK Streets/Roads Mill
and
overlay
eight
miles
of
roadway 










2,100,000
 3
Midwest
City OK Streets/Roads Replace
damaged
sidewalks
in
residen3al
areas 










1,300,000
 3
Midwest
City OK Streets/Roads Construct
one
mile
of
sound
barrier
wall 












500,000
 5
Midwest
City OK Streets/Roads Construct
trails
for
recrea3onal
uses
and
other
modes
of
transporta3on 










5,000,000
 5
Midwest
City OK Streets/Roads Install
two
miles
of
ligh3ng,
r/w
fencing
and
landscaping 










2,300,000
 5
Midwest
City OK Streets/Roads Reconstruct
nine
intersec3ons
within
the
city 










3,400,000
 10
Midwest
City OK Streets/Roads Replace
structurally
deficient
bridge
on
Midwest
Blvd. 










2,800,000
 15
Midwest
City OK Streets/Roads Construct
light
rail
first
phase
of
system
 










4,000,000
 25
Moore OK Streets/Roads ADA
ramps
and
pedestrian
signal
installa3on
‐
13
intersec3ons
City‐wide 












200,000
 2
City State Program Project
Descrip3on Funding
Required Jobs
Moore OK Streets/Roads Roadway
striping
and
signage,
City‐wide 












800,000
 8
Moore OK Streets/Roads S.
4th
Street/I‐35
Overpass
bridge
redecking 










1,500,000
 14
Moore OK Streets/Roads NW
27th
Street
(Santa
Fe
to
Janeway)
Reconstruct,
grading,
drainage,
sidewalks 










2,335,000
 22
Moore OK Streets/Roads Telephone
Road
(SW
4th
to
NW
5th)
Reconstruct,
grading,
drainage,
sidewalks 










2,988,000
 28
Moore OK Streets/Roads N
12th
Street
(Eastern
to
Buck
Thomas
Park)
Reconstruct,
grading,
drainage,
sidewalks 










3,642,000
 34
Moore OK Streets/Roads N
12th
Street
(I‐35
to
Eastern)
Reconstruct,
grading,
drainage,
sidewalks 










4,670,000
 43
Moore OK Streets/Roads Janeway
Avenue
(NW
12th
to
NW
27th)
Reconstruct,
grading,
drainage,
sidewalks 










6,000,000
 55
Moore OK Streets/Roads I‐35/S.
34th
Street
Bridge
Project,
construct
new
bridge
across
I‐35 








16,000,000
 147
Muskogee OK Airport 4/22
Runway
Safety
areas
‐
Davis
Field
Airport 










1,000,000
 25
Muskogee OK Airport Taxiway
Charlie
Pavement
Rehabilita3on
at
Davis
Field
Airport 










2,500,000
 30
Muskogee OK Housing The
Housing
Rehabilita3on
and
Neighborhood
Redevelopment
Program 










1,500,000
 24
Muskogee OK Streets/Roads Mar3n
Luther
King
Rehabilita3on
from
12th
to
24th 










1,200,000
 30
Muskogee OK Water Anthony
Street
Drainage 










1,422,500
 25
Muskogee OK Water Chandler
Road
Deten3on
pond 










1,557,000
 25
Muskogee OK Water Elliof
Street
Drainage 










1,221,000
 25
Muskogee OK Water Sec3on
of
Sewer
Interceptor
Line
along
"Coody
Creek" 










1,000,000
 25
Muskogee OK Water Upgrade
and
Expand
Water
Treatment
Plant 








30,000,000
 125
Norman OK Amtrak Heartland
Flyer
extension
to
Kansas 










3,000,000

Norman OK CDBG Sidewalks 














71,915
 1
Norman OK CDBG Water
lines 












140,200
 4
Norman OK CDBG Street
projects 












623,619
 8
Norman OK CDBG Downtown
revitaliza3on
efforts 










1,500,000
 20
Norman OK Energy cng
fueling
sta3on 












350,000
 5
Norman OK Energy methane
co‐genera3on
system 










1,200,000
 10
Norman OK Public
Safety community
policing 










1,500,000
 23
Norman OK Streets/Roads sidewalk
accessibility 












560,000
 10
Norman OK Streets/Roads Robinson
Street
underpass 










2,959,911
 35
Norman OK Streets/Roads West
Main
bridge
construc3on
and
maintenance 










3,300,000
 50
Norman OK Streets/Roads bike
paths 










3,000,000
 60
Norman OK Streets/Roads road
reconstruc3on 










2,000,000
 60
Norman OK Transit Quiet
zone
improvements 












500,000
 4
Norman OK Transit Bus
service
expansion 










2,700,000
 30
Norman OK Water water
line
repairs 












499,999
 15
Norman OK Water sanita3on
transfer
sta3on
renova3on 










3,500,000
 20
Norman OK Water wastewater
treatment
plant
improvements 








33,200,000
 51
Norman OK Water water
plant
upgrades 










7,550,000
 58
Norman OK Water sewer
interceptor
lines
&
lib
sta3ons 










9,000,000
 64
Norman OK Water new
water
wells
&
distribu3on
system 










8,802,800
 83
Oklahoma
City OK Airport Purchase
3
CNG
parking
shufle
buses 












240,000
 0
Oklahoma
City OK Airport Re‐pave
North
and
West
Shufle
parking
lots
at
Will
Rogers
World
Airport 












225,000
 2
Oklahoma
City OK Airport Transformer
replacement
for
taxiway
lights
at
Will
Rogers
Airport 












350,000
 4
Oklahoma
City OK Airport Extend
water
and
sanitary
sewer
lines
along
S.
Portland
Avenue
at
Will
Rogers
World
Ariport 












400,000
 5
Oklahoma
City OK Airport Intall
taxiway
lights
at
Clarence
E.
Page
Airport 












560,000
 6
Oklahoma
City OK Airport Reconstruct
taxiways
at
Clarence
E.
Page
airport 












660,000
 7
Oklahoma
City OK Airport Replace
automated
airfield
ligh3ng
at
Wiley
Post
Airport 












600,000
 7
Oklahoma
City OK Airport Construct
permeter
fencing
at
Wiley
Post
Airport 










2,000,000
 22
Oklahoma
City OK Airport Upgrade
taxiway
ligh3ng
at
Will
Rogers
World
Airport 










2,300,000
 26
Oklahoma
City OK Airport Taxi
lane
and
infrastructure
improvements
at
Wiley
Post
Airport 










2,500,000
 27
Oklahoma
City OK Airport Reconstruct,
widen
and
extend
runway
17R/35L
at
Wiley
Post
Airport 










4,000,000
 44
Oklahoma
City OK CDBG Drainage
‐
SW
51st
Street
and
Land
Avenue 












375,000
 4.17
Oklahoma
City OK CDBG Drainage
‐
NE
16th
Street
and
Peachtree 












400,000
 4.44
Oklahoma
City OK CDBG Drainage
‐
NW
36th
Street
to
NW
38th
Street,
west
of
Amelia 












500,000
 5.56
Oklahoma
City OK CDBG Drainage
‐
Purchase
of
River
Skimmer
Equipment 












500,000
 5.56
Oklahoma
City OK CDBG Demoli3on
of
old
post
office
facility
at
SW
5th
and
Hudson 










1,000,000
 15
Oklahoma
City OK CDBG Drainage
‐
NW
25th
Street
and
Peniel
Avenue,
Phase
II 










1,400,000
 15.56
Oklahoma
City OK CDBG Drainage
‐
SW
15th
Street
and
McKinley
Avenue
to
Twincreek 










1,465,000
 16.28
Oklahoma
City OK CDBG Southern
Oaks
Library,
3600
S.
Walker
Avenue 










1,840,000
 20.44
Oklahoma
City OK CDBG Emergency
home
repairs
for
senior
ci3zens
and
low
income
homeowners
(low
income
census
tracts)
to

improve
200
homes.
 










3,000,000
 33
Oklahoma
City OK CDBG Drainage
‐
Deten3on
pond
in
Oliver
Park
in
the
vicinity
of
SW
29th
Street
and
Santa
Fe
Avenue,
Phase
II 










4,400,000
 48.89
Oklahoma
City OK CDBG Construct
sidewalks
in
Neighborhood
Revitaliza3on
Strategy
Area
up
to
400,000
linear
feet
of
sidewalks 










5,000,000
 60
Oklahoma
City OK CDBG Renovate
buildings
to
create
a
resource
center
and
housing
outreach
center
in
conjunc3on
with
Homeless

Alliance.
 










5,000,000
 60
Oklahoma
City OK CDBG Renovate
former
JC
Penney
Building
(donated
to
the
City
and
transferred
to
La3no
Community
Development

Agency)
for
use
as
a
community
center
and
public
service
center.
 










5,500,000
 61
Oklahoma
City OK CDBG Pioneer
Library,
vicinity
of
SW
89th
Street
between
I‐44
and
Santa
Fe
Avenue 










5,800,000
 64.44
Oklahoma
City OK CDBG Drainage
‐
NW
3rd
Street
to
NW
5th
Street
and
Ann
Arbor
to
Oklahoma
River 










6,000,000
 66.67
Oklahoma
City OK CDBG New
Library,
Northwest
Oklahoma
City 








10,240,000
 113.8
Oklahoma
City OK Energy Install
one(1)
CNG
fueling
sta3ons 










1,000,000
 11.11
Oklahoma
City OK Energy Weatherize
City
Facili3es 










1,300,000
 14.44
Oklahoma
City OK Energy Install
six(6)
CNG
fueling
sta3ons 










6,000,000
 66.67
City State Program Project
Descrip3on Funding
Required Jobs
Oklahoma
City OK Housing Modernize
160
units
of
public
housing 










2,400,000
 30
Oklahoma
City OK Housing Rehabilitate
public
housing
for
persons
with
disabili3es.
 










5,000,000
 60
Oklahoma
City OK Public
Safety New
Fire
Sta3on,
Bricktown 










1,875,000
 20.83
Oklahoma
City OK Public
Safety New
Fire
Sta3on,
Northeast
Oklahoma
City 










1,875,000
 20.83
Oklahoma
City OK Schools Student
Desktop
and
teacher
laptop
computer
replacements/purchase 










4,000,000
 0
Oklahoma
City OK Schools Nichols
Hills 










2,450,000
 27
Oklahoma
City OK Schools Putnam
Heights 










2,700,000
 30
Oklahoma
City OK Schools Lee 










2,910,000
 32
Oklahoma
City OK Schools Hoover
Elementary 










3,900,000
 43.3
Oklahoma
City OK Schools North
Highland
Elementary 










4,800,000
 53
Oklahoma
City OK Schools Coolidge
 










4,900,000
 54
Oklahoma
City OK Schools Stand
Wa3e 










5,130,000
 57
Oklahoma
City OK Streets/Roads Signal
Improvements
‐
NW
16th
and
May
Avenue 












200,000
 2.22
Oklahoma
City OK Streets/Roads Maintenance
‐
Chip
&
Seal
Program,
AC
Overlay
64
Lane
Miles
(favoring
wards
with
rural
roads
at
a
cost
of

$5,000
per
lane
mile) 












320,000
 3.56
Oklahoma
City OK Streets/Roads Maintenance
‐
Equipment
and
labor
to
support
the
addi3onal
38
lane
miles
at
at
cost
of
approximately
$5,000

per
lane
mile
(partner
with
Coun3es) 












320,000
 3.56
Oklahoma
City OK Streets/Roads Maintenance
‐
Microresurfacing
Program,
purchase
addi3onal
Micro‐Paver
and
keep
salvage
machine
to

support
the
addi3onal
64
lane
miles 












335,500
 3.73
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Cimarron
Road,
0.8
Mi
S
of
SW
15th 












450,000
 5
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Frisco
Road,
0.7
mi
S
of
SW
59th 












450,000
 5
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Mustang
Road,
South
of
NW
164th 












450,000
 5
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Over
I‐40
at
F
Avenue 












500,000
 5.56
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Over
I‐40
at
Luther
Road 












500,000
 5.56
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Over
I‐40
at
Post
Road 












500,000
 5.56
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Over
I‐40
at
Triple
X 












500,000
 5.56
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Over
I‐40
at
Westminster
Road 












500,000
 5.56
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
SW
29th
0.3
mi
east
of
Portland
Avenue 












550,000
 6.11
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
SW
29th,
0.3
Mi
E
of
Portland
Ave 












650,000
 6.11
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Richland
Road,
0.3
Mi
N
of
NW
10th 












620,000
 6.89
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Rockwell,
0.6
Mi
S
of
SW
15th 












620,000
 6.89
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
SW
59th
0.6
mi
east
of
Cemetery
Road 












620,000
 6.89
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Penn
Ave
0.3
mi
South
of
SW
149th 












635,000
 7.06
Oklahoma
City OK Streets/Roads Maintenance
‐
Chip
&
Seal
Program,
Full
Depth
Repair,
14
lane
miles
(two
per
ward
at
a
cost
of
$50,000
per

lane
mile) 












700,000
 7.78
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
SW
15th
0.6
mi
east
of
Cimarron
Road 












740,000
 8.22
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
SW
15th,
0.6
Mi
E
of
Cimarron
Road 












740,000
 8.22
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Richland
Road,
0.6
Mi
S
of
NW
36th 












825,000
 9.17
Oklahoma
City OK Streets/Roads Trails
‐
North
Grand
Boulevard 










1,000,000
 11.11
Oklahoma
City OK Streets/Roads Signal
Improvements
‐
ITS
Citywide 










1,000,000
 11.12
Oklahoma
City OK Streets/Roads Bridge
Rehab
‐
Frisco
Road,
0.8
mi
S
of
NW
164th 










1,030,000
 11.44
Oklahoma
City OK Streets/Roads Trails
‐
Earlywine
S
May
to
Blackwelder 










1,500,000
 16.67
Oklahoma
City OK Streets/Roads Maintenance
‐
Microresurfacing
Program,
164
lane
miles
at
a
cost
of
$15,000
per
lane
mile
(preserve
exis3ng

roadways
with
decent
ra3ngs) 










2,460,000
 27.33
Oklahoma
City OK Streets/Roads Street
Rehabilita3on
‐
Widening
of
NW
164th
Street
from
Pennsylvania
Avenue
to
Western
Avenue 










3,500,000
 38.89
Oklahoma
City OK Streets/Roads Street
Rehabilita3on
‐
Widening
of
North
May
Avenue
from
NW
178th
Street
to
NW
192nd
Street 










3,620,000
 40.22
Oklahoma
City OK Streets/Roads Trails
‐
Tinker
AFB
to
Draper
Lake 










3,800,000
 42.22
Oklahoma
City OK Streets/Roads Signal
Improvements
‐
Synchroniza3on
of
traffic
signals
City‐wide
using
Wi‐Fi
Technology 










4,000,000
 44.44
Oklahoma
City OK Streets/Roads Street
Rehabilita3on
‐
Construct
Quiet
Zone
Improvements
at
Rail
Crossings
Downtown 










5,000,000
 55.56
Oklahoma
City OK Streets/Roads Street
Rehabilita3on
‐
Western
Avenue
from
SW
134th
Street
to
SW
179th
Street 








11,000,000
 122.2
Oklahoma
City OK Streets/Roads Street
Rehabilita3on
‐
Lincoln/Byers
Interchange
on
the
new
I‐40
alignment 








16,000,000
 177.8
Oklahoma
City OK Streets/Roads Street
Rehabilita3on
‐
45
lane
miles
Citywide 








25,622,500
 284.7
Oklahoma
City OK Streets/Roads Street
Resurfacing
‐
382
Lane
Miles
Arterial
Resurfacing 








38,155,000
 423.9
Oklahoma
City OK Streets/Roads Street
Rehabilita3on
‐
Fully
fund
I‐40
Reloca3on
and
the
new
Boulevard
to
replace
the
exis3ng
alignment 








98,000,000
 1089
Oklahoma
City OK Transit Purchase
fibeen(15)
35'
Transit
Buses 










5,250,000
 0
Oklahoma
City OK Transit Improve
Access
to
Bus
Stops 












500,000
 5.56
Oklahoma
City OK Transit Ferry
Boat
Maintenance
Facility 










1,400,000
 15.56
Oklahoma
City OK Transit Real
Time
bus
informa3on 










1,500,000
 16.67
Oklahoma
City OK Transit Improvements
to
bus
maintenance
facility 










2,000,000
 22.22
Oklahoma
City OK Water Replacement
of
8"
Sanitary
Sewer
Mains
from
NE
10th
to
16th
from
Fonshill
to
Missouri
(4,405
b) 












500,000
 5.56
Oklahoma
City OK Water Replacement
of
8"
Sanitary
Sewer
Mains
from
NW
45
to
50
‐
Western
to
Classen
(4,100
b) 












500,000
 5.56
Oklahoma
City OK Water 6"
Water
Main
Replacement
from
NW
34th
to
NW
35th
b/w
Dewey
to
Robinson
(2,750
b) 












550,000
 6.11
Oklahoma
City OK Water 12"
Water
Main
Replacement
along
NW
50th
from
Miller
Place
to
Penn.
(3,900
b) 












600,000
 6.67
Oklahoma
City OK Water Replace
6"
&
8"
Water
Mains
along
NW
84th
from
Western
to
Waverly;
Agnew
‐
Villa
b/w
SW
51st
to
SW
55th

(7,300
b) 












900,000
 10
Oklahoma
City OK Water Replace
6"
Water
Mains
from
NW
71
to
NW
72,
Hammond
to
N.
MacArthur
(Warr
Acres)
4,600
b;
and
Along

NW
38th
b/w
Pennsylvania
Ave.
&
Youngs
Blvd.
2,600
b 












960,000
 10.67
Oklahoma
City OK Water Replacement
of
8"
Sanitary
Sewer
Mains
b/w
NW
37th
and
41st
from
May
to
Chicago
(10,400
b) 










1,200,000
 13.33
Oklahoma
City OK Water 8"
Water
Main
Replacement
near
NW
58
‐
NW
60th
St
from
MacArthur
to
Redmond 










1,350,000
 15
Oklahoma
City OK Water 6"
and
12"
Water
Main
Replacement
from
Penn
to
Haverhill
Pl.
b/w
Lanesboro
Dr.
and
Plymouth
Dr.
(Village

Project)
(11,900
b) 










1,700,000
 19
Oklahoma
City OK Water Replacement
of
66‐inch
Aerial
Crossing
near
NE
58th
and
Grand
Blvd 










2,000,000
 22.22
City State Program Project
Descrip3on Funding
Required Jobs
Oklahoma
City OK Water 2.5
miles
48"
Mid
Urban
Sanitary
Sewer
Relief
Line;
SW
15,
Rockwell
to
1/2
mile
west
of
Council 










5,000,000
 55.56
Oklahoma
City OK Water 60"
Raw
Water
Transmission
Main
Reloca3on
near
Byng,
OK 










5,000,000
 55.6
Oklahoma
City OK Water Replacement
of
60"
PCCP
along
Douglas
Ave
b/w
SW
74th
and
SW
36th
(12,000
b) 










8,500,000
 94.44
Oklahoma
City OK Water Chisholm
Creek
SS

Relief
Main
near
NW
150
&
Western
to
NW
115
&
Penn:
1
mile
36"
and
1.5
mile
24" 










9,000,000
 100
Oklahoma
City OK Water 3
mile
‐
48"
Water
Transmission
Main
along
SE
164th
from
Telephone
Road
to
Pennsylvania 








10,000,000
 111.1
Oklahoma
City OK Water New
12
MG
Clearwell
at
Hefner
Water
Treatment
Plant
 








10,000,000
 111.1
Oklahoma
City OK Water 1
Mile
48"
Water
Transmission
Main
from
Hefner
WTP
to
east
of
Hefner
Pkwy;
and
2
miles
42"
Water

Transmission
Main
from
Hefner
Pkwy
to
Western
along
Hefner
Rd 








12,000,000
 133.3
Oklahoma
City OK Water 6
mile
‐
48"
Water
Transmission
Main
from
SW
164th
&
Penn
to
SW
104th
&
Portland 








16,000,000
 177.8
Oklahoma
City OK Water Chisholm
Creek
Watewater
Treatment
Plant
5
MGD
Expansion 








18,000,000
 200
Oklahoma
City OK Water Atoka
Pipeline
Pump
Sta3on
Rehabilita3on 








43,000,000
 477.8
Ponca
City OK CDBG Street
Maintenance
Projects:
Shirlee‐14th
Street
to
500'
East
Clarke
Street
‐
1509
‐
1617
McGraw
Drive
‐
1300
‐
1404
Meadow
Lane
‐
Prospect
to
Crawford
Ash
Street
‐
Overbrook
to
Greenwood 










2,000,000

Ponca
City OK CDBG Sanitary
Sewer
Rehabilita3on
1200
Block
of
Princeton
Between
Oklahoma
to
Central
Avenue 












130,000
 10
Ponca
City OK CDBG Lake
Ponca
Raw
Water
Transmission
Main
and
Valve
Repair 












300,000
 15
Ponca
City OK CDBG Brentwood
Lib
Sta3on
Upgrade 












500,000
 20
Ponca
City OK CDBG Eastside
Sanitary
Sewer
Interceptor 










1,400,000
 20
Ponca
City OK CDBG Sanitary
Sewer
Interceptor

Between
Pizza
Hut
&
J.
C.
Penny's 












500,000
 20
Ponca
City OK CDBG Stoneridge
Lib
Sta3on
Elimina3on 












350,000
 20
Ponca
City OK CDBG Reconstruc3on
of
Pecan
Road
(Lake
Road
to
Juanita) 










1,000,000
 30
Ponca
City OK CDBG WTP
Lime
Feed
&
Storage
System
Upgrade 










2,000,000
 30
Ponca
City OK CDBG Downtown
Sidewalk
Project 










3,000,000
 40
Ponca
City OK CDBG Osage
Lib
Sta3on
to
Re‐Route
Sanitary
Sewer
from
Refinery
Complex 










2,300,000
 40
Ponca
City OK CDBG Ponca
City
Aqua3c
&
Family
Center 








22,500,000
 110
Ponca
City OK CDBG Ponca
City
Conference
Center/Auditorium 








37,000,000
 135
Sand
Springs OK CDBG Streetscape
Improvements
&
50/50
Facade
Grants/Leverage
Local
Funds 












500,000
 10
Sand
Springs OK Energy Green
U3lity
Savings
Project:
Retrofit
Pub
Bldgs;
Replace
Meters;
Convert
to
Fixed‐Pt
Auto.Mtr.Read 








10,000,000
 40
Sand
Springs OK Streets/Roads Add
&
Upgrade
Handicap
Access
Ramps
at
Intersec3ons 












360,000
 6
Sand
Springs OK Streets/Roads Upgrade
Traffic
Signal
Heads
(LED),
Controllers,
Detec3on
(20
Intersect) 












160,000
 6
Sand
Springs OK Streets/Roads Asphalt
Paving
&
Upgrading
Alleys
in
Original
Townsite
Area 












250,000
 12
Sand
Springs OK Streets/Roads Storm
Sewer
Piping
&
Outlet
in
conjunc3on
with
Morrow
Rd
Overlay
Project 










1,500,000
 15
Sand
Springs OK Streets/Roads 129th
W
Ave
(41st
St
to
56th
St)
Asphalt
Overlay,
Restripe 












300,000
 18
Sand
Springs OK Streets/Roads Morrow
Rd/W21st
St
(Adams
Rd
to
81st
W
Ave)
Asphalt
Overlay,
Restripe 












200,000
 18
Sand
Springs OK Streets/Roads Airport
Road
(Asphalt
Overlay,
Restripe
&
Dress
Eroded
Slopes
 












750,000
 24
Sand
Springs OK Streets/Roads East
2nd
Street
(Adams
Rd
to
Main
St)
Mill
Surface,
Asphalt
Overlay,
Restripe 












350,000
 24
Sand
Springs OK Streets/Roads Morrow
Rd
(Main
St
to
Adams
Rd)
Mill
Surface,
Asphalt
Overlay,
Restripe,
Repair
&
Replace
Curbs 












700,000
 24
Sand
Springs OK Streets/Roads Asphalt
Paving
of
Soccer
Field
Parking
Lot 












300,000
 25
Sand
Springs OK Streets/Roads Avery
Drive
(65th
W
Ave
to
SH
97)
Stabilize
Embankment
&
Asphalt
Overlay,
Restripe 










2,000,000
 25
Sand
Springs OK Streets/Roads McKinley
Ave
(Broadway
to
Osage
County
Line)
Spot
Repair
Failing
Subgrade
&
Asphalt
Overlay,
Restripe 












450,000
 25
Sand
Springs OK Streets/Roads Old
North
Rd
(65th
W
Ave
to
Adams
Rd)
Asphalt
Overlay
&
Add
Bike
Lane
 










1,200,000
 25
Sand
Springs OK Streets/Roads Wekiwa
Rd
(129th
W
Ave
to
177th
W
Ave)
Asphalt
Overlay,
Restripe 












500,000
 25
Sand
Springs OK Water Add
North
Woods
Chlorina3on
Sta3on 












125,000
 3
Sand
Springs OK Water Sand
Creek
Lagoon
Improvements
(Add
Aerators) 












500,000
 4
Sand
Springs OK Water Hwy
97
12
&
16‐inch
Water
Main
(Oak
Ridge
Drive
to
North
Woods
Tank 










1,400,000
 10
Sand
Springs OK Water Wastewater
Lib
Sta3ons‐
Upgrade
3
to
meet
ODEQ/EPA
Regula3ons 












345,000
 15
Sand
Springs OK Water Water
Storage
Tank
Rehabilita3on
(6
Tanks) 












950,000
 36
Sand
Springs OK Water Wastewater
Collec3on
Line
Replacements
(
8
Loca3ons) 












518,000
 48
Sand
Springs OK Water Replace
2‐inch
Water
Mains
with
6
or
8‐inch
Mains
(
11
Loca3ons) 










1,474,000
 66
Sapulpa OK Water Construct
Johnson
and
Johannes
Relief
Sewer
Line
to
comply
with
State
and
Federal
Regula3ons 










2,800,000
 15
Sapulpa OK Water Replace
2MG
Water
Storage
Tank
at
West
Pump
sta3on
to
assure
con3nued
water
supply
and
delivery 










3,000,000
 20
Tulsa OK Airport Rehabilitate
Airfield
Pavements
‐
Jones
Riverside
‐
Project
will
rehabilitate
a
variety
of
taxiways
and
taxilanes

throughout
the
airport
including
Taxiway
Zulu
that
serves
Runway
1R/19L;
Taxiway
Bravo
and
Taxilanes
JJ,
KK,

LL,
MM,
and
NN
that
serve
the
No 










1,700,000
 10
Tulsa OK Airport Extend
Taxilane
November‐Alpha
‐Project
constructs
approximately
940
feet
of
taxilane
into
the
North

Development
Area.

It
includes
earthwork,
concrete
paving
and
minor
drainage
improvements.
This
project
is

currently
adver3sing
for
bids.

Bid
opening
is 










1,750,000
 11
Tulsa OK Airport Airport
Terminal
Building
Roadway
Reconstruc3on
‐
The
project
will
repair
and
upgrade
the
Terminal
Building

Roadway
at
the
Tulsa
Interna3onal
Airport.
Por3ons
of
the
roadway
system
that
provides
access
to
the

Terminal
Building
are
in
need
of
replacemen 










2,250,000
 13
Tulsa OK Amtrak Amtrak
Feasibility
Study 












250,000
 1
Tulsa OK CDBG North
Tulsa
Specialty
Clinic 








10,000,000
 80
Tulsa OK CDBG Phase
II
Cancer
Center
Satellite
and
Imaging
Center 








10,000,000
 80
Tulsa OK CDBG Electronic
Health
Record
Development 








15,000,000
 100
Tulsa OK CDBG Federally
Qualified
Primary
Care
Clinic 










5,000,000
 100
Tulsa OK CDBG North
Tulsa
Regional
Wellness
Center 










5,000,000
 100
Tulsa OK CDBG Mar3n
Regional
Library
Expansion 










8,900,000
 167
Tulsa OK CDBG Indigent
care
regional
medical
center
facility
expansion
and
renova3on
(providing
enhanced
services
to

underserved
and
at
risk
popula3ons) 








30,000,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Tulsa OK CDBG Regional
Medical
Informa3cs
Network,
Data
Warehouse
and
Electronic
Health
Records 








25,000,000
 250
Tulsa OK Energy Energy
Efficient
Facili3es
Improvements 










1,600,000
 9
Tulsa OK Energy Energy
Efficient
Public
Housing
Infrastructure
Improvements 










1,680,000
 10
Tulsa OK Energy Compressed
natural
Gas
(CNG)
Fleet
Fueling
Infrastructure
Expansion‐Expand
the
City`s
CNG
infrastructure
to

fuel
the
growing
CNG
fleet
and
provide
for
the
conversion
of
20
light
duty
vehicles. 










2,080,000
 12
Tulsa OK Public
Safety Railroad
Crossings
‐
At
Grade
Safety
Improvements
‐
Union
Pacific
rail
line
from
1st
Street
to
Peoria
Ave.
 










5,000,000
 18
Tulsa OK Public
Safety Police
Public
Safety
Facility
Improvements 










5,240,000
 30
Tulsa OK Public
Safety Regional
Training
Center
‐
A
regional
fire
training
center
to
provide
fire
and
homeland
security
training
for
Tulsa

and
surrounding
communi3es.

 








55,000,000
 100
Tulsa OK Public
Safety Digital
Infrastructure
Conduit
Expansion 








70,000,000
 312
Tulsa OK Schools Early
Childhood
Educa3on
Centers
‐
construct
ten
educa3on
centers
to
serve
at
risk
popula3on. 






100,000,000
 250
Tulsa OK Streets/Roads Boulder
Avenue
Bridge‐
Design
&
Construc3on











9,000,000
 72
Tulsa OK Streets/Roads Port
Road
Extension
‐
Yale
Avenue
to
Sheridan
Road 








25,200,000
 150
Tulsa OK Streets/Roads Gilcrease
West
‐
Phase
1
‐
41st
West
Avenue
to
Tisdale 








61,000,000
 366
Tulsa OK Streets/Roads Gilcrease
West
Arkansas
River
Bridge
‐
Charles
Page
Blvd
to
West
21st
Street 








80,000,000
 480
Tulsa OK Streets/Roads Roadway
Improvements‐Improve
74
roadway
segments
thru
pavement
rehabilita3on
and
lane
widening
to

reduce
conges3on,
and
improve
public
safety. 






200,731,000
 1200
Tulsa OK Transit Sidewalk
Infrastructure
Improvements‐Construct
5
sidewalk
projects
that
improve
pedestrian
access
to
transit

connec3ons. 












940,000
 9
Tulsa OK Transit Transit
System
Improvements
‐
ADA
compliant
passenger
shelters,
hybrid
lib
vans,
and
hybrid
transit
coaches

for
underserved
areas
and
popula3on 








13,250,000
 52
Tulsa OK Transit Tulsa
Regional
Urban
Rail
Infrastructure
 








41,500,000
 225
Tulsa OK Water Flood
Control
Infrastructure
Improvements‐Construct
8
stormsewer,
channel,
culvert,
and
bridge
projects
to

improve
public
safety
and
reduce
property
damage
associated
with
localized
flood
events. 










3,768,000
 22
Tulsa OK Water Wasterwater
System
Improvements‐Construct
4
wastewater
collec3on
system
projects
to
eliminate
health
and

safety
concerns
associated
with
sewage
overflows. 










8,900,000
 54
Tulsa OK Water Water
System
Infrastructure‐Construct
18
water
distribu3on,
supply,
and
treatment
projects
throughout
the

City
of
Tulsa
to
improve
the
delivery
of
safe
drinking
water. 








20,673,000
 120
Tulsa OK Water Deepening
McClellan
Kerr
Naviga3on
Channel
to
12b.
from
9b.
and
add
addi3onal
barge
parking
and
fleet

areas
to
allow
for
safe
and
efficient
freight
and
barge
traffic
movement. 








49,200,000
 295
Tulsa OK Water Arkansas
River
Corridor
‐
improve
or
construct
three
low
water
dams
and
associated
sedimenta3on
control
 








75,000,000
 450
Corvallis OR Airport Runway
extension 










3,150,000
 59
Corvallis OR CDBG Seavey/Alexander
Affordable
Housing
Development
infrastrucutre 












750,000
 13
Corvallis OR CDBG Detox
facility
for
drug
and
alcohol
services 










1,000,000
 17
Corvallis OR CDBG Hilltop
Village
19
unit
Affordable
Housing
Development
infrastructure 










1,500,000
 25
Corvallis OR CDBG Emergency
Shelter/Drop
in
Center
for
homeless
not
eligible
for
exis3ng
services 










2,000,000
 34
Corvallis OR CDBG South
Corvallis
Combined
Services
facility;
food
bank,
furniture
share,
Headstart,
neighborhood
center 










2,000,000
 34
Corvallis OR Public
Safety Addi3onal
officers
to
address
public
safety
needs 












326,000
 4
Corvallis OR Streets/Roads Hwy
34/20
intersec3on
w/
53rd
street
improvements 












179,700
 8
Corvallis OR Streets/Roads Hwy
99N
four
lane;
overpass
to
Circle
blvd 










1,500,000
 25
Corvallis OR Transit Transit
opera3ons
center 










2,806,500
 53
Eugene OR Airport Surface
Scan
System

‐
Uses
sensors
to
relay
informa3on
concerning
pavement
temperatures
and
details
about

water/chemical
content
on
our
runways 














75,000
 5
Eugene OR Airport Runway
rehab
project
to
resurface
the
main
runway
at
the
airport 










6,000,000
 114
Eugene OR Amtrak Eugene
AMTRAK
Sta3on
Site
Improvements
‐
Ligh3ng
and
Paving
Improvements
to
rail
passenger
areas 












200,000
 3
Eugene OR CDBG Construct
park
picnic
shelter 












125,000
 1
Eugene OR CDBG Park
pond
concrete
removal
and
riparian
restora3on 












150,000
 1
Eugene OR CDBG Trail
Renova3on
and
Interpre3ve
Signage 












150,000
 1
Eugene OR CDBG Trail
Preserva3on
and
Renova3on 












200,000
 2
Eugene OR CDBG Hult
Center
hea3ng
system
conversion
‐
required
due
to
closure
of
local
steam
u3lity 












250,000
 3
Eugene OR CDBG Interstate
Bridge
project
to
include
addi3onal
open
space
elements,
par3cularly
trail
enhancements
in

Willamefe 












500,000
 8
Eugene OR CDBG Redevelop
vacant
lot
in
downtown
Eugene
at
10th
and
Charnelton
‐
200,000
square
feet
of
new
construc3on

to
feature
mix
of
office
and
rental
housing.

Approx.
$500,000
in
public
par3cipa3on
is
needed
for
project.

The

total
cost
of
project
is
es3mated 












500,000
 8
Eugene OR CDBG Redevelop
vacant
lot
in
downtown
Eugene
at
Broadway
and
Willamefe
‐
200,000
square
feet
of
new

construc3on
to
feature
mix
of
office
and
rental
housing.

Approx.
$500,000
in
public
par3cipa3on
is
needed
for

project.

 












500,000
 8
Eugene OR CDBG Park
Irriga3on,
Potable
Water
and
Electrical
Supply
Improvements 












600,000
 9
Eugene OR CDBG Roosevelt
Crossing
housing
complex
‐
new
construc3on
‐
need
funding
to
fill
current
funding
gap 












400,000
 9
Eugene OR CDBG Renovate
park
ligh3ng
systems 












750,000
 11
Eugene OR CDBG Priority
1
playground
renova3ons:

large‐scale
play
area
renova3ons 












800,000
 12
Eugene OR CDBG Design
and
construct
covered
skate
park
in
City
Center
area 










1,000,000
 16
Eugene OR CDBG Lamb
Building
‐
Low‐Income
Housing
development
‐
35
units 










1,000,000
 16
Eugene OR CDBG Renovate
park
restrooms
citywide 










1,025,000
 16
Eugene OR CDBG Trail
Enhancement 










1,000,000
 16
Eugene OR CDBG Priority
1
park
renova3ons:

large‐scale
park
renova3ons
in
State
Street
Park 










1,400,000
 22
Eugene OR CDBG Construct
spray
play
facili3es
to
replace
6
wading
pools
closed
due
to
state
rule 










1,500,000
 23
Eugene OR CDBG Resurface,
reconstruct
or
replace
23
exis3ng
tennis
courts 










1,500,000
 23
Eugene OR CDBG West
Eugene
Environmental
Educa3on
Center
‐
construc3on
of
science
laboratory
and
educa3onal
facili3es

and
adjacent
infrastructure. 










1,500,000
 23
Eugene OR Energy Install
solar
hot
water
system
at
Echo
Hollow
Pool
‐
reduce
natural
gas
costs 












225,000
 3
City State Program Project
Descrip3on Funding
Required Jobs
Eugene OR Energy Solar
Power
retrofits
for
MWMC
facili3es 














50,000
 3
Eugene OR Energy Through
a
collabora3ve
partnership
between
the
City
of
Eugene
(COE)
and
the
Eugene
Water
&
Electric
Board,

this
program
proposes
to
complete
energy
efficient
retrofits
to
upwards
of
400
units
per
year
using
the
EPA

Home
Performance
with
ENERGY
STAR
(HPwE 










3,800,000
 60
Eugene OR Housing Public
Housing
Moderniza3on 












900,000
 14
Eugene OR Housing Building
Remodel
‐Low‐Income
Housing
development
‐
replace
failing
founda3on
at
60
unit
housing
project

and
New
stairwells
&
balconies,
new
roofs
and
a
remodel
of
the
laundry
rooms

(stairwells
&
balconies
are
a
priority)
at
another
67
unit
low‐income
pr 










1,850,000
 31
Eugene OR Public
Safety Emergency
Command
Training
Center
‐Build
and
equip
an
emergency
center
with
the
most
up‐to‐date

technology
to
replicate
incident
scenarios
and
provide
a
realis3c
experience
that
will
train
incident

commanders
and
team
leaders. 










1,500,000
 24
Eugene OR Public
Safety Police
Patrol
Building
‐It
would
be
the
opera3onal
base
for
approximately
120
patrol
officers,
20
sergeants,
6

lieutenants,
and
one
captain.

The
facility
would
include
office
space
(for
command,
TEU
and
MCI),
locker

rooms,
briefing
rooms,
a
command
center 








24,000,000
 384
Eugene OR Streets/Roads Accessible
Pedestrian
Signals 












100,000
 1
Eugene OR Streets/Roads ADA
Curb
Ramps 












100,000
 2
Eugene OR Streets/Roads Fox
Hollow
At
Amazon
Channel
Enhancements
‐
Improving
stormwater
quality 












361,000
 7
Eugene OR Streets/Roads Traffic
Signal
Improvements
‐
Safety
and
Capacity 












400,000
 7
Eugene OR Streets/Roads Elimina3ng
drywells
and
improving
stormwater
conveyance 












500,000
 9
Eugene OR Streets/Roads Ligh3ng
of
an
exis3ng
mul3‐use
path 












571,000
 10
Eugene OR Streets/Roads New
mulit‐use
path 












993,000
 18
Eugene OR Streets/Roads Mul3‐use
path
over
Delta
Highway 










2,500,000
 47
Eugene OR Streets/Roads Street
Improvements
‐
Preserva3on
&
Upgrade
to
Urban
Standards 










3,875,000
 73
Eugene OR Streets/Roads Replace
bridges
over
Amazon
Creek
at
Chambers,
Garfield,
City
View,
and
Bailey
Hill.
(per
concepts
in
Metro

Waterways
Study)
to
eliminate
conveyance
constric3on
points
and
improve
ped/bicycle
underpasses 










4,500,000
 85
Eugene OR Streets/Roads Bike/Ped
Improvements 










9,203,000
 174
Eugene OR Streets/Roads Pavement
preserva3on 








36,819,000
 676
Eugene OR Transit Eugene
Rail
Depot
Phase
2,
Passenger
&
Site
Improvements
‐
to
restore
elements
removed
from
project
due
to

funding
limita3ons 












200,000
 4
Eugene OR Water Beneficial
reuse
site
crop
analysis
and
irriga3on
assessment 












200,000
 3
Eugene OR Water Greenway/greenspace
water
reuse
irriga3on
assessment 












250,000
 3
Eugene OR Water Recycled
water
market
study 












250,000
 3
Eugene OR Water Confluence
Island
Floodplain/Channel
Restora3on 












300,000
 4
Eugene OR Water Confluence
Island
Hydrologic
Study 












300,000
 4
Eugene OR Water Recycled
water
community
implementa3on
study/planning 












300,000
 4
Eugene OR Water Water
Main
Line
Extension 














50,000
 5
Eugene OR Water Replacement
of
perimeter
fence
and
security
upgrades 












500,000
 8
Eugene OR Water Resource
Management
‐
Struvite
Pelle3za3on
Inves3ga3on/Assessment/Design 












800,000
 12
Eugene OR Water Community
Sewers
‐Providing
direct
wastewater
connec3ons 










1,000,000
 19
Eugene OR Water Enhance
SIW
for
reclaimed
water
use
or
biofuel
produc3on 










1,000,000
 19
Eugene OR Water lagoon
upgrade
‐
stormwater
system,
recycled
water,
etc. 










1,000,000
 19
Eugene OR Water Upgrade
to
exis3ng
recycled
water
force
main 










1,500,000
 28
Eugene OR Water Chemically‐Enhanced
Primary
Treatment 










2,000,000
 32
Eugene OR Water Sanitary
Force
Main
Inves3ga3on,
inspec3on,
and
maintenance/upgrade 










2,500,000
 40
Eugene OR Water Biocycle
Farm
Irriga3on
Assessment/Design
and
Upgrade 










3,000,000
 48
Eugene OR Water Biosolids
Drying
Bed
Replacement 










3,000,000
 48
Eugene OR Water Water
pollu3on
Control
Facility
‐

lagoon
upgrade
‐
cleanup
and
lining 










4,000,000
 64
Eugene OR Water Sludge
Thickening
Facility 










4,500,000
 72
Eugene OR Water Wastewater
System
Rehabilita3on 










4,000,000
 76
Eugene OR Water Private
Lateral
Rehabilita3on
Program 










5,000,000
 80
Eugene OR Water Resource
management
‐
canoe
canal
mul3‐objec3ve
improvements 










5,000,000
 80
Eugene OR Water Sodium
Hypochlorite
conversion 










5,000,000
 80
Eugene OR Water Complete
Delta
Ponds
Enhancement
Project
(culvert
under
Goodpasture
Island
Road
and
Delta
Highway,
finish

riparian
benches,
plant
benches,
trails,
signage,
parking
lot) 










5,500,000
 88
Eugene OR Water Biogas
Co‐genera3on
enhancement 










6,000,000
 96
Eugene OR Water Mesophilic
Sludge
Digester 










9,000,000
 144
Eugene OR Water Sludge
Lagoon
Reline
‐
all
phases 








10,000,000
 160
Eugene OR Water Aera3on
Basin
Upgrade
‐
Phase
II 








11,000,000
 176
Eugene OR Water Odorous
Air
Project
‐
all
phases 








13,000,000
 208
Eugene OR Water Amazon
Creek
bank
stabiliza3on: 








15,000,000
 240
Eugene OR Water Ter3ary
filtra3on
facility
‐
all
phases 








28,000,000
 448
Gresham OR CDBG Kane
Drive
‐
restore
improvement
elements,
stormwater
system
replacement,
transporta3on
improvement

elements 










3,750,000
 104
Gresham OR CDBG Underground
Injec3on
Control
Systems
Improvements 










5,000,000
 139
Gresham OR CDBG Industrial
Land
Access
Improvements
‐
improve
access
to
industrial
areas
and
increase
capacity
for
new

industrial
development 








18,700,000
 520
Gresham OR Streets/Roads Pedestrian
mobility/capacity
improvements
‐
infill
missing
sidewalk,
install
crosswalk
signaliza3on. 










2,500,000
 70
Gresham OR Streets/Roads Traffic
Signal
Improvments
‐
rebuild
falling
span‐wire
signals,
replace
outdated
signal
controllers,
replace

lenses,
etc. 










2,500,000
 70
Gresham OR Streets/Roads Contract
Pavement
Preserva3on
for
iden3fied
deferred
pavement
maintenance 








20,000,000
 556
Gresham OR Water 242
Ave.
Water
Line
Upgrade,
Glisan
to
Stark 










1,500,000
 42
Gresham OR Water Glisan
Water
Line
Upgrade
‐
new
water
line
to
serve
adjacent
industrial
land
and
development. 










2,800,000
 78
Gresham OR Water Johnson
Creek
Watershed
Restora3on
‐
flood
protec3on
and
habitat
restora3on.

Authorized
in
WRDA. 










5,000,000
 139
City State Program Project
Descrip3on Funding
Required Jobs
Gresham OR Water Wastewater
Treatment
Plan
Secondary
Clarifier
‐
Design
complete;
necessary
to
accomodate
growth
and

ensure
water
quality
compliance. 








13,000,000
 361
Lake
Oswego OR Water Replacement
of
the
backbone
of
the
City's
sewer
system
in
Oswego
Lake
to
prevent
overflows,
ensure
ongoing

sewer
service
by
making
it
seismically
stable
and
address
an
Oregon
DEQ
Mutual
Agreement
and
Order
to

begin
the
project
at
a
3me
certain.

The
proj 








80,000,000
 700
Ontario OR Streets/Roads SE
5th
Ave.
‐
I‐84
to
S.
East
Lane.

Upgrade
to
urban
minor
arterial
with
pedestrian/bicycle
improvements. 












650,000
 65
Ontario OR Streets/Roads SW
Park
Blvd.
‐
SW
11th
Ave.
to
SW
10th
Ave.

New
minor
collector
with
pedestrian/bicycle
improvements. 












675,000
 68
Ontario OR Streets/Roads NW
Park
Blvd.
‐
N
Oregon
St
to
Malheur
Dr
New
urban
collector
with
pedestrian/bicycle
facili3es. 












700,000
 70
Ontario OR Streets/Roads SE
5th
Ave.
‐
SE
5th
St.
to
I‐84.

Upgrade
to
major
collector
with
pedestrian/bicycle
improvements. 












700,000
 70
Ontario OR Streets/Roads N.
Oregon
St.
‐
N.
Bypass
to
1/4
north
of
N.
Fortner
St.
Relocate
&
rebuild
with
pedestrian/bicycle

improvements
to
connect
with
N.
Bypass
at
NW
20th
Ave. 












850,000
 85
Ontario OR Streets/Roads NW
Park
Blvd
‐
Malheur
Dr
to
NW
4th
Ave.
Upgrade
to
urban
collector
with
pedestrian/bicycle
improvements. 












862,000
 86
Ontario OR Streets/Roads SE
2nd
St.
‐
SE
9th
Ave.
to
Butler
Blvd.

Upgrade
to
urban
major
collector
with
pedestrian/bicycle

improvements. 












862,000
 86
Ontario OR Streets/Roads NW
4th
Ave.
roadway
improvements
from
Tori
Street
to
400'
West
of
Hwy
201.

To
include
water
and
sewer

upgrades. 










1,500,000
 140
Ontario OR Streets/Roads SE
5th
Ave.
‐
Bridge
over
I‐84.

Widen
bridge
with
pedestrian/bicycle
improvements. 










4,798,000
 480
Ontario OR Water Pipelines
for
SE
10th
Street
from
McDaniel
Mobile
to
SE
5th
Ave.,
SE
2nd
Ave.
from
SE
4th
St.
to
SE
1st
St.,

Northwest
area
improvements,
and
SE
5th
Ave.
improvements.

Per
2008
Facili3es
Planning
Study. 










1,082,800
 109
Ontario OR Water Pipelines
for
SW
4th
and
S.
Dorian
Dr.,
Washington
Ave.
and
Yturri
Beltline,
Malheur
Drive
and
Park
Blvd.,
S.

Oregon
Street
and
13th
Ave.

Per
2008
Facili3es
Planning
Study. 










1,234,700
 124
Ontario OR Water Wastewater
Improvements
to
include;
parallel
24"
FM
to
WWTP,
Beltway
pipeline,
improvements
near
NW
8th

Ave.
lib
sta3on,
upgrade
Tapadera
lib
sta3on,
and
relocate
West
Idaho
lib
sta3on.

Per
2008
Facili3es
Planning

Study. 










1,394,600
 140
Ontario OR Water 3mg
storage
reservoir,
booster
sta3on
flow
meter
and
SCADA,
standby
generator
on
3,000
gpm
pump,
and

replace
check
valves
with
pipe
spools.

Per
2008
Facility
Planning
Study. 










2,532,000
 254
Oregon
City OR Amtrak Oregon
City
Amtrak
Sta3on
improvements
(building
and
parking
lot) 










1,500,000
 32
Oregon
City OR Streets/Roads John
McLoughlin
Historic
WPA
Promenade
Safety
Improvements 










1,000,000
 8
Oregon
City OR Streets/Roads Division
Street
Pavement
Rehabilita3on 










1,500,000
 46
Oregon
City OR Streets/Roads Beavercreek/Molalla
Improvements 












500,000
 48
Oregon
City OR Streets/Roads Molalla/Warner
Milne
Realignment 










2,500,000
 50
Oregon
City OR Streets/Roads Molalla
Avenue
Roundabout 










4,000,000
 56
Oregon
City OR Streets/Roads OR
Highway
213/Redland
Road 










8,000,000
 800
Oregon
City OR Streets/Roads I‐205/OR
Highway
213
Interchange 








15,000,000
 1927
Oregon
City OR Transit Purchase
three
trolleys 










1,000,000
 24
Oregon
City OR Transit Trolley
Barn 










4,500,000
 36
Portland OR CDBG Portland
Parks
and
Trails
Construc3on:

Construc3on
of
a
community
center,
the
development
of
several
parks,

and
10
miles
of
mul3‐modal
trails 








86,000,000
 1118
Portland OR Streets/Roads Portland
Bridge
Repair:
repair
and
reconstruc3on 








22,000,000
 312
Portland OR Streets/Roads Portland
Arterial
Paving,
Improvement,
and
Safety:
improving
arterials
in
the
City;
includes
paving,
safety

improvements,
conges3on
relief,
and
bicycle
boulevards 








65,000,000
 959
Portland OR Transit Portland
Streetcar:
the
extension
of
the
Portland
streetcar
loop
across
the
river
to
OMSI 








75,000,000
 600
Portland OR Water Sewer
Capacity
Reconstruc3on:
the
expansion
of
the
Columbia
Wastewater
Plant
and
the
reconstruc3on
of
a

number
of
key
facili3es
in
the
citywide
system 








52,000,000
 724
Salem OR Airport South
Hanger
Area
improvements,
includes
add3onal
taxi
lane,
more
hanger
areas,
and
security
fencing. 












400,000
 20
Salem OR CDBG Replace
structurally
and
opera3onally
deficient
opera3ons
service
center
for
public
works
func3ons.
 








14,500,000
 320
Salem OR Housing Replace
flooring
in
family
units
at
6
sites. 












237,000
 6
Salem OR Housing Replace
old
deteriorated
doors,
including
hardware
and
locks,
with
new
energy
efficient
ones
at
6
low
income

family
sites. 












320,000
 6
Salem OR Housing Upgrade
exis3ng
playgrounds
for
ADA
and
safety
compliance
at
4
low
income
family
sites. 












140,000
 6
Salem OR Housing Energy
efficiency
upgrades
at
all
public
housing
sites. 










1,535,000
 11
Salem OR Housing Replace
aging
and
leaking
roof
systems
at
3
family
sites. 












240,000
 15
Salem OR Streets/Roads Pavement
restora3on
and
resurfacing
of
Airport
Rd.,
SE,
State
St.
to
Mission
St. 












470,000
 8
Salem OR Streets/Roads Pavement
restora3on
and
resurfacing
of
Kale
St.
NE,
Portland
Rd.
to
49th
Ave. 












440,000
 8
Salem OR Streets/Roads Pavement
restora3on
and
resurfacing
of
Chemewa
Rd.,
NE
to
Portland
Rd. 












590,000
 11
Salem OR Streets/Roads Pavement
restora3on
and
resurfacing
of
Hyacinth
St.,
BNRR
to
Portland
Rd. 












680,000
 12
Salem OR Streets/Roads Pavement
restora3on
and
resurfacing
of
Turner
Rd.
SE,
Boone
Rd.
to
SE
City
limits. 












690,000
 13
Salem OR Streets/Roads Add
leb
turn
lane
and
signaliza3on
to
Kuebler
Blvd. 












798,000
 14
Salem OR Streets/Roads Pavement
restora3on
and
resurfacing
of
25th
St.,
State
St.
to
Mission
St. 












790,000
 14
Salem OR Streets/Roads Bellevue
St.
Re‐alignment 












877,390
 16
Salem OR Streets/Roads Pavement
restora3on
and
resurfacing
of
River
Rd.
South,
Owens
St.
to
Croisan
Creek
Rd. 












990,000
 18
Salem OR Streets/Roads Construc3on
of
a
half
street
improvement
to
Strong
Rd.,
SE 










1,950,000
 34
Salem OR Streets/Roads Access
and
pedestrian
improvements
along
Pringle
Creek 










2,292,920
 41
Salem OR Streets/Roads Union
St.
Railroad
Bridge,
Phase
ll 










3,000,000
 54
Salem OR Streets/Roads South
Airport
Industrial
Park
Phase
ll,
Infrastructure
Improvements 










4,600,000
 83
Salem OR Streets/Roads South
Airport
Industrial
Park
Phase
1B,
Infrastructure
Improvements 










6,080,000
 108
Salem OR Streets/Roads Street
and
sidewalk
improvments
on
Salem
Industrial
Drive
Extension,
Anunsen
St.
to
Hyacinth
St. 










7,700,000
 139
Salem OR Streets/Roads Road
and
infrastructure
improvements
to
Gaffin
and
Cordon
Roads
including
widening,
drainage,
curbage,

gufers,
signals
and
turn
lanes.

Make
other
infrastructure
improvements
necessary
to
serve
the
Salem

Renewable
Energy
&
Technology
Park. 










7,800,000
 140
Salem OR Streets/Roads Provide
road
improvements
to
McGhilchrist
St.
with
turn
lanes,
bike
lanes,
signals,
sidewalks,
and
stormwater

infrastructure,
which
in
turn
will
help
lure
businesses
to
this
underu3lized
industrial
area. 








18,700,000
 337
Salem OR Streets/Roads Full
street
improvement
and
undergrounding
of
u3li3es
on
Portland
Rd.,
Phase
ll. 








22,500,000
 405
Salem OR Water Reed
Ln/Barnes
Rd.
Stormwater
Conveyance
System
Improvements 












400,000
 6
City State Program Project
Descrip3on Funding
Required Jobs
Salem OR Water Stoneway
Stormwater
Conveyance
System
Improvements 












300,000
 6
Salem OR Water Install
watermain
for
adequate
capacity
at
Fabry
Rd. 












600,000
 8
Salem OR Water Center
St./Greenbriar
Gravity
Sewer 










1,250,000
 12
Salem OR Water Replace
failing
18"
watermain
at
Liberty
St. 










1,750,000
 17
Salem OR Water Cordon
Rd.
Gravity
Sewer 










1,657,000
 18
Salem OR Water West
Marion
Wastewater
Collec3on
Improvements 










1,750,000
 18
Salem OR Water Geren
Island
Sand
Filter
Replacement 










2,600,000
 24
Salem OR Water Install
parallel
main
for
adequate
capacity
at
Boone
Rd. 










3,500,000
 34
Salem OR Water Safer/Hayesville
Gravity
Sewer 










4,400,000
 38
Salem OR Water Build
a
new
reservoir,
water
mains,
and
related
pipework
to
serve
state
and
county
correc3onal
facili3es,
Mill

Creek
Corporate
Center,
and
SE
Salem
residents. 










9,000,000
 162
Allentown PA CDBG Equipment
for
Recycling
Center:

Trommel
Screener
Tub
Grinder,
Trash
Transfer
to
Trailer
Compactor
Unit 










1,120,000
 1
Allentown PA CDBG Roosevelt/
Old
Fairgrounds
Improvements 












200,000
 1
Allentown PA CDBG Bucke
Boyle
Bathhouse
Renova3on 












500,000
 2
Allentown PA CDBG Playground
Improvements
&
Replacement
including
Safety
Program 












277,000
 3
Allentown PA CDBG City
Hall
Improvements:




Elevator
Replacement,



Replacement
of
Lights
and
Trolley
around
City
Hall
Perimeter,


City
Hall
HVAC
System 












700,000
 5
Allentown PA CDBG Roof
Replacements
at
various
City
Buildings
(Ceiling
at
Filter
Plant) 












475,000
 5
Allentown PA CDBG Site
Prepara3on
&
Constuc3on
of
Transer
Pit
for
Recyling
&
Solid
Waste 












750,000
 6
Allentown PA CDBG Trail
Development
&
Improvement:
East
Side‐
Lehigh
River,
Incinerator
Site,
Barber's
Quarry
Branch,
Canal
Park

Tow
Path
 










1,990,000
 13
Allentown PA CDBG Street
Trees
and
Urban
Forest
Ini3a3ve 










2,500,000
 15
Allentown PA CDBG Allentown
Cemetery
Improvements 










1,500,000
 17
Allentown PA CDBG Union
Bap3st
Community
Center,
6th
&
Chew
Streets 










4,000,000
 30
Allentown PA CDBG Sacred
Heart
Neighborhood
Public
Improvements 










5,000,000
 47
Allentown PA CDBG General
Park
Improvments:
Field
Renova3ons,
Drainage,
Parking
Lot,
&
Restrooms.

Parks
including,
Cedar

Beach/Parkway,Trexler
&
Lehigh
Parkway
(Wall
Repairs),
Keck,
Fellowship
East,
Nice
13,
East
Side
Reservoir,

Incenerator
Site,
Franklin,
Jordan,
Jordan 










6,568,000
 50
Allentown PA CDBG City
Pool
Renova3ons
(Cedar
Beach,
Mack,
Foundtain,
Jordon,
&
Irving)
Renova3ons
to
include:

New
or

Patching
Floors,
Sandblas3ng,
Ceramic
Tile,
Plastering,
New
Filtra3on
Systems,
New
Vacuuming
Systems,

Revised
Chemical
Systems,
New
Perimeter
Piping,
 










5,700,000
 62
Allentown PA CDBG City
of
Allentown
Riverfront
Development
Project 








20,000,000
 300
Allentown PA CDBG City
of
Allentown
Conven3on
Center 








20,000,000
 350
Allentown PA Streets/Roads Reconstruct
1
(one)
street,
Union
‐
American
Parkway
to
RR
Tracks













750,000
 5
Allentown PA Streets/Roads Of
St.
Streetscape
Enhancements













750,000
 7
Allentown PA Streets/Roads Front
Street
Streetscape
Enhancements
(Hamilton
to
City
Line) 








11,000,000
 14
Allentown PA Streets/Roads 19th
Street
Streetscape
Ini3a3ve
(Liberty
to
Tilghman) 










1,500,000
 15
Allentown PA Streets/Roads Hamilton
Street
Electrical
Upgrade 










2,500,000
 16
Allentown PA Streets/Roads Traffic
Calming
for
Chapel
Ave
&
Parkway
Blvd











2,000,000
 20
Allentown PA Streets/Roads West
Park
Streetscape
Ini3a3ve 










3,000,000
 20
Allentown PA Streets/Roads Rehab
9
(nine)
Concrete
Streets:

Plymouth
‐
Union
to
Columbia;
Arch‐
Parkway
to
Turner;
29th
‐
Parkway
to

Turner;
Allen
‐
Arch
to
Glenwood;
Walnut
‐
2nd
to
3rd;
Sherman
‐
Union
to
Hanover;
4th
‐
Washingon
to

Walnut;
Union
‐
4th
to
5th;
and
Harrison
‐
Leh 










3,565,000
 21
Allentown PA Streets/Roads New
Concrete
for
6
(six)
streets:

Chew
‐23rd
to
31st;
Refwal
‐
Green
to
Allen;
Type
‐
14th
to
Mercer;
Hazel
‐

Chew
to
Gordon;
Page
‐
Howard
to
11th;
and
Monroe
‐
5th
to
Williams 










2,775,000
 25
Allentown PA Streets/Roads Old
Allentown
Streetscape
Improvements 










5,000,000
 40
Allentown PA Streets/Roads 8th
Street
Bridge
Enhancements 










6,000,000
 45
Allentown PA Streets/Roads 7th
Street
Enhancements
(Walnut
to
City
Line) 










7,500,000
 50
Allentown PA Streets/Roads Mill
&
Overlay
5
(five)
streets:

Harrison
‐
S.
Hall
to
S
10th;
Hanover
‐
Bridge
East
to
Irging;
Hamilton
‐

2nd
to

5th
(part
of
Downtown
Commercial
Corridor):
Mack
‐
Emaus
to
8th
St
Underpass;

and
Plymouth
‐
Union
to

Hanover 










5,090,000
 50
Allentown PA Streets/Roads Ralumac
Midway
Manor
&
West
Brook
Park
Neighborhoods 










5,000,000
 50
Allentown PA Water Halstead
Tank
–
Pain3ng
of
Elevated
Storage
Tank













100,000
 0
Allentown PA Water Huckleberry
Ridge
Reservoir
–
Installa3on
of
Sodium
Hypochlorite
Generator
for
Reservoir
















35,000
 0
Allentown PA Water Schantz
Flooding
Inves3ga3on
–
Evalua3on
of
Flood
Control
Measures
to
Protect
Schantz
Spring 














20,000
 0
Allentown PA Water Water
Distribu3on
Replacement
(In
House)













400,000
 0
Allentown PA Water Lehigh
River
Flood
Dike
Maintenance
–
Annual
Maintenance
on
Federal
Flood
Control
Project















250,000
 1
Allentown PA Water Security
–
Upgrades
at
the
Wastewater
Plant
to
meet
Federal
Regula3ons















100,000
 1
Allentown PA Water Sludge
Basin
Cleaning
Equipment













100,000
 1
Allentown PA Water Miscellaneous
Drainage
Improvements
 












250,000
 2
Allentown PA Water Motor
Control
Replacement
(MCC1)
–
(In
progress)
Replacement
of
Major
Electrical
Equipment
from
the
 












600,000
 3
Allentown PA Water Centrifugally
Spun
Cast
Iron
Pipe
Replacement
(In
House)













400,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
Allentown PA Water Water
Main
Replacement


(Contract
Out)













710,000
 6
Allentown PA Water Covers
for
Plate
Seflers 










1,500,000
 7
Allentown PA Water Sewer
System
Extension
 












790,000
 7
Allentown PA Water Saintary
Flow
Monitoring
Evalua3on
for
Excessive
Inflow
&
Infitlra3on 












800,000
 8
Allentown PA Water Ozona3on
Equipment
for
Lehigh
River
Intake 










3,500,000
 15
Allentown PA Water Removal
of
Inflow
&
Infiltra3on 










1,500,000
 15
Allentown PA Water Automa3c
Meter
Reading
Program 










6,000,000
 60
Bethlehem PA CDBG Construc3on
of
restrooms
at
City
Line
Lifle
League
field 














85,000
 6
Bethlehem PA CDBG Restore
and
rehabilitate
1850
Historic
Stock
House
into
Visitors
Center 










2,500,000
 50
Bethlehem PA CDBG Develop
400
car
space
parking
garage
adjacent
to
Historic
Fla3ron
building 










6,000,000
 75
Bethlehem PA CDBG Develop
300
car
space
parking
garage
on
South
Main
Street 










6,500,000
 100
Bethlehem PA CDBG 1000
car
space
garage
and
mul3‐modal
transporta3on
center
for
Bethlehem
Works 








25,000,000
 150
Bethlehem PA Energy Establishment
of
energy
efficiency
grant
fund
to
assist
homeowners
in
energy
efficiency
renova3ons
to
their

homes 










1,000,000

Bethlehem PA Energy Install
Greenroof
on
City
Hall
‐
Building
A 














90,000
 8
Bethlehem PA Energy Upgrade
mechanical
systems
in
City
Hall
complex 












210,000
 8
Bethlehem PA Energy Installa3on
of
solar
panels
at
City
Hall
complex 












200,000
 12
Bethlehem PA Energy Window/door
replacement
at
City
Hall
complex 














80,000
 18
Bethlehem PA Energy Public/Private
partnership
to
construct
hydrogen
fueling
infrastructure
on
former
Bethlehem
Steel
brownfield

site 










4,000,000
 150
Bethlehem PA Public
Safety Install
emergency
generators
at
all
Fire
Sta3ons 












100,000
 4
Bethlehem PA Public
Safety Upgrade
of
Monocacy
Complex
power
system/infrastructure 












100,000
 4
Bethlehem PA Public
Safety Resurface
Yosko
Park
and
Sand
Island
basketball
courts 












120,000
 6
Bethlehem PA Public
Safety Renova3ons
to
Daughters
of
the
American
Revolu3on
House 












120,000
 8
Bethlehem PA Public
Safety Replacement
of
garage
floor
and
access
ramps
‐
City
Hall 












210,000
 8
Bethlehem PA Public
Safety Resurface
Westside
Park
tennis
courts 














65,000
 8
Bethlehem PA Public
Safety Saucon
Park‐Saints
field
eleva3on
and
ligh3ng 












175,000
 10
Bethlehem PA Public
Safety Various
improvements
to
Municipal
Service
Center
Garage 














70,000
 10
Bethlehem PA Public
Safety Public
pool
repairs/improvements 












300,000
 12
Bethlehem PA Public
Safety Construct
new
EMS
facility
at
Eaton
Avenue 












700,000
 15
Bethlehem PA Public
Safety Redesign
of
Friendship,
Fairview,
and
Higbee
Parks 












600,000
 15
Bethlehem PA Public
Safety Construct
new
Firehouse
replacing
Lincoln
Fire
Sta3on 










2,450,000
 20
Bethlehem PA Public
Safety Develop
Sand
Island
West 












350,000
 20
Bethlehem PA Public
Safety Firearms
Range
Development 










1,224,113
 25
Bethlehem PA Public
Safety Public
Safety
training
facility
with
training
tower
and
EVOC
course
for
Police,
Fire
and
EMS 










3,000,000
 25
Bethlehem PA Public
Safety Construct
Skate
Park 










1,500,000
 30
Bethlehem PA Public
Safety Purchase
and
renova3on
of
building
for
Public
Safety
annex 










3,500,000
 50
Bethlehem PA Public
Safety Develop
Greenway
from
New
Street
to
Lynn
Avenue 










3,200,000
 60
Bethlehem PA Streets/Roads Streets
Bureau
storage
facility 












100,000
 20
Bethlehem PA Streets/Roads Traffic
Bureau
truck
storage
facility 














90,000
 20
Bethlehem PA Streets/Roads Perry
Street
Improvements 












115,000
 30
Bethlehem PA Streets/Roads City
Hall
complex
laybys,
Phase
III 












135,000
 35
Bethlehem PA Streets/Roads College
Drive
(Apple
Street)
Improvements 












132,000
 35
Bethlehem PA Streets/Roads West
Garrison
Street
reconstruc3on 












130,000
 35
Bethlehem PA Streets/Roads Greenmeadow
Drive
storm
sewer
improvements 












145,000
 40
Bethlehem PA Streets/Roads Linden
Street
storm
sewer
improvements 












200,000
 50
Bethlehem PA Streets/Roads West
Goepp
Street
storm
sewer
improvements 












250,000
 65
Bethlehem PA Streets/Roads Repairs
to
10
bridges
in
the
City 












300,000
 80
Bethlehem PA Streets/Roads South
Mountain
Drive
resurfacing
and
reconstruc3on 












340,000
 80
Bethlehem PA Streets/Roads East
Fibh
Street
reconstruc3on 












400,000
 100
Bethlehem PA Streets/Roads Municipal
garage
building
addi3on 












500,000
 100
Bethlehem PA Streets/Roads Johnston
Drive
swale
improvements 










1,000,000
 170
Bethlehem PA Streets/Roads Carlton
Avenue
improvements
to
curb,
sidewalk,
overlay
streets,
remove
and
plant
new
trees,
renew
water

and
sewer
mains. 










1,220,000
 200
Bethlehem PA Streets/Roads Engineering
and
replacement
of
High
Street
bridge 










1,200,000
 200
Bethlehem PA Streets/Roads One‐Way
Pair
program
conver3ng
major
gateway
streets
to
one‐way,
complete
signage,
pavement
markings,

pedestrian
safety
improvements
and
addi3onal
on‐street
parking 










2,500,000
 400
Bethlehem PA Water Diversion
manhole
upgrades
at
Waste
Water
Treatment
Plant
to
alleviate
hydraulic
grade
line
issues
in

collec3on
system
and
sanity
sewer
overflows 












400,000
 10
Bethlehem PA Water Security
improvements
for
water
distribu3on
system 












300,000
 13
Bethlehem PA Water Waste
Water
Distribu3on
System
renewal
to
replace
aged
water
mains 










1,000,000
 13
Bethlehem PA Water Extension
of
City‐owned
infrastructure
into
Bethlehem
Township
for
service 










6,600,000
 14
Bethlehem PA Water Backwash
system
improvement
at
water
filtra3on
plant 










1,800,000
 16
Bethlehem PA Water Oxidant
Delivery
System
to
combat
biofilm
in
raw
water
transmission
mains 










1,800,000
 16
Bethlehem PA Water Waste
Water
Collec3on
System
renewal/I&I
reduc3on 










1,500,000
 17
Bethlehem PA Water Phase
1
upgrades
and
expansion
to
Waste
Water
Treatment
Plant 








10,330,000
 50
Cheltenham,
PA PA Energy Upgrade
all
traffic
signals
within
municipality
to
LED's
to
reduce
energy
costs. 














50,000
 6
Cheltenham,
PA PA Streets/Roads Resurfacing
and
repaving
of
various
streets
within
local
roadway
network
throughout
municipality
to
provide

safety
and
enhance
mobility.

 












600,000
 10
Cheltenham,
PA PA Streets/Roads Streetscape
Enhancements
and
Traffic
Calming
Improvement
Project
for
the
Elkins
Park
East
Commercial

District
to
provide
ADA
accessibility
and
safe
intermodal
connec3vity
along
local
road
network
of
High
School

Road,
Montgomery,
Harrison
&
Park
Avenues. 










1,828,850
 20
City State Program Project
Descrip3on Funding
Required Jobs
Cheltenham,
PA PA Streets/Roads Streetscape
Enhancements
and
Traffic
Calming
Improvements,
Phase
III,
(Springhouse
Ln
to
Church
Rd)
in

Glenside
Commercial
District
to
provide
ADA
accessibility
and
safe
intermodal
connectability
between
local

University
and
regional
rail
sta3on.
 










1,426,697
 20
Cheltenham,
PA PA Water Sanitary
Wastewater
Infrastructure
Repairs,
Phase
II,
including
repairs,
replacement
and
reloca3on
of
old

sanitary
wastewater
lines
as
part
of
a
consent
decree
order
by
the
Pennsylvania
DEP
along
the
Cheltenham

municipal
interceptor. 










4,000,000
 10
Harrisburg PA Airport Obstruc3on
Removal
Work
at
Harrisburg
Interna3onal
Airport
(removal
of
vacant
power
plant,
other
out

buildings) 








14,000,000
 250
Harrisburg PA Amtrak Track
Extension
at
Harrisburg
Transporta3on
Center;
major
security
upgrades
to
center
and
rail
tracks
into
the

city 










5,800,000
 125
Harrisburg PA CDBG Energy
conserva3on
retrofits
to
city
and
school
district
buildings 










7,000,000
 35
Harrisburg PA CDBG Construct
and
open
first‐ever
Ex‐Offender
Re‐Entry
and
Job
Training
Center,
including
equipment 








15,000,000
 75
Harrisburg PA CDBG Build
citywide
Rec
Center
&
Ska3ng
Rink 










9,000,000
 120
Harrisburg PA CDBG Construc3on
of
Department
of
Public
Works
Building 








15,000,000
 150
Harrisburg PA CDBG Construc3on
of
Steam
Line
from
Waste‐to‐Energy
Facility
to
Downtown
District
Hea3ng
Plant 








17,500,000
 150
Harrisburg PA CDBG Reconstruc3on
/repaving
of
75
Streets 










7,250,000
 150
Harrisburg PA CDBG Eighteen
story
mixed‐used
commercial
center
in
downtown 








12,000,000
 400
Harrisburg PA CDBG Acquisi3on
of
350
Rental
units,
Renova3on
and
Resale
for
Affordable
Housing
to
new
homeowners
of

moderate
income 








22,750,000
 500
Harrisburg PA CDBG Construc3on
of
2
downtown
hotels 








22,000,000
 500
Harrisburg PA Energy Installa3on
of
Solar
Panels
on
city,
school
district
bldgs.,
on
streetlights,
traffic
signals 








20,000,000
 110
Harrisburg PA Energy Installa3on
of
roobop
wind
turbines
on
public
sites,
including
their
grid
connec3ons 








14,000,000
 125
Harrisburg PA Energy Retrofit
and
Energy
Efficency
Upgrade
to
Waste‐to‐Energy
Plant
(where
steam
and
electricty
are
co‐generated) 








28,000,000
 125
Harrisburg PA Energy Energy
conserva3on
retrofit
to
low‐income
homeowner's
homes 








20,000,000
 300
Harrisburg PA Housing Energy
conserva3on
retrofit,
security
upgrades
and
building
improvements 








32,000,000
 78
Harrisburg PA Public
Safety Vehicles,
radios
and
gear
for
50
new
police
officers 










1,150,000
 5
Harrisburg PA Public
Safety Hire
Community
Rela3ons
Coordinator
and
5
support
staff
(for
greater
police‐public
interac3on,
crime
watch

group
support,
public
informa3on
role) 












285,000
 6
Harrisburg PA Public
Safety Replace
Metro
criminal
informa3on
system
with
state‐of‐the‐art
technology
that
also
accords
inter‐operability

with
other
agencies) 










9,500,000
 25
Harrisburg PA Public
Safety Hire
50
new
police
officers 










3,100,000
 50
Harrisburg PA Schools Energy
efficiency
retrofit
of
school
buildings,
machinery
and
equipment 










8,000,000
 50
Harrisburg PA Schools Replacement
of
former
Woodward
School
with
new
pre‐school/elementary
campus 








32,000,000
 250
Harrisburg PA Schools Construc3on
of
30
Pre‐School
Classrooms
and
15
Reading
Recovery
classrooms 








32,000,000
 350
Harrisburg PA Schools Renova3on
and
Upgrade
to
William
Penn
School
Campus
(built
1926) 








62,000,000
 350
Harrisburg PA Schools Construc3on
of
new
voca3onal‐technical
school
campus,
to
be
named
the
21st
Century
Job
Skills
Center,

including
elementary
and
seondary
classrooms
and
vo‐tech
industry
center 








68,000,000
 550
Harrisburg PA Schools Replacement
of
12
roofs
of
exis3ng
schools
and
replacement
of
HVAC,
Plumbing
and
Electrical
systems
of
5

schools 








70,000,000
 550
Harrisburg PA Streets/Roads Downtown
Streetscape
Improvement
Project:
Complete
upgrade
and
expansion
of
all
sidewalks,
curbs,

streetlights,
street
furniture.
Intersec3ons
and
signage
of
central
business
district
(already
designed)









27,500,000
 350
Harrisburg PA Streets/Roads Landuse
and
Infrastructure
Study
and
Replacement
of
Water,
Sewer
&
Other
U3lity
Lines
in
Southgate
Project 








30,000,000
 500
Harrisburg PA Streets/Roads Build
Transporta3on
Component
of
Southgate
Project
(involves
replacement
roadways,
bridges,
relieves

conges3on
and
spurs
$3
billion
in
economic
development) 








98,000,000
 750
Harrisburg PA Transit Build
Regional
Rail
Stop
at
HBG.
Interna3onal
Airport 










2,800,000
 35
Harrisburg PA Transit New,
energy‐efficient
bus
stops
with
LED
informa3on
screens 










2,000,000
 50
Harrisburg PA Transit Purchase
natural‐gas
powered
mass
transit
buses,
including
downtown
trolley
buses 










7,000,000
 75
Harrisburg PA Transit Improvements
to
bldg.
and
rail
tracks
at
Harrisburg
Transporta3on
Center
(bus
and
rail
center) 










9,200,000
 150
Harrisburg PA Water Nitrate
Removal
Project
at
Wastewater
Plant,
the
effluent
of
which
flows
into
the
Chesapeake
Bay 








62,000,000
 250
Harrisburg PA Water Water
and
Sewer
Line
Replacements,
Upgrades
and
Elimina3on
of
Combined
Stormwater/Wastewater
Lines

into
seperated
lines 








90,000,000
 850
Lancaster PA CDBG Downtown
Streetscape
Improvements 










6,000,000
 25
Lancaster PA CDBG South
Duke
Street
Improvements 










3,000,000
 35
Lancaster PA CDBG North
Market
Street
Parking
Garage 








11,000,000
 50
Lancaster PA CDBG Conestoga
Plaza 










6,000,000
 75
Lancaster PA CDBG ChurchTowne
Freedom
Center 








16,000,000
 100
Lancaster PA Public
Safety Six
School
Resource
Police
Officers 












400,000
 6
Philadelphia PA Airport Airfield
‐
New
Interior
Perimeter
Service
Road 










2,000,000
 66
Philadelphia PA Airport Rehabilitate
Taxiways
A
&
L
(PNE)
‐
Pavement
rehabilita3on
will
consist
of
mill
and
overlay,
crack
repairs,
and

full
depth
pavement
replacement. 










3,000,000
 99
Philadelphia PA Airport Airfield
Electrical
Improvements‐
The
airfield
signage,
ligh3ng,
and
cabling
will
be
replaced
and
upgraded. 










4,000,000
 132
Philadelphia PA Airport Reconstruct
RW
9R/27L
‐
Funds
will
be
used
for
pavement
resurfacing
to
Runway
9R/27L. 








15,000,000
 495
Philadelphia PA Airport Reconstruct
D‐E
Apron
‐
Over
one
million
square
feet
of
14‐inch
thick
concrete
paving
located
between
Terminals
D
and
E
will
be
replaced.


old
pavement
surface
has
reached
the
end
of
useful
life
for
safe
opera3on
of
aircrab" 








24,000,000
 792
Philadelphia PA CDBG Bookmobiles:
Purchase
and
deployment
of
bookmobiles
in
underserved
communi3es
in
the
city. 












500,000
 14
Philadelphia PA CDBG Engagement
center
for
homeless:
Central
intake
loca3on
for
homeless
individuals
and
families
with
feeding
center,
behavioral
health
assessment,

and
overnight
sleeping
accommoda3ons
while
assessment
and
placement
is
undertaken. 










2,500,000
 29
Philadelphia PA CDBG Robin
Hood
Dell
East:
Reconstruc3on
of
sea3ng,
drainage,
ligh3ng,
stage,
and
other
improvements 










5,000,000
 56
City State Program Project
Descrip3on Funding
Required Jobs
Philadelphia PA CDBG Branch
Library
Improvements:
Upgrade
of
Facili3es
including
Structural
and
mechanical
Systems 










5,000,000
 58
Philadelphia PA CDBG 30th
Street
Gateway:
Pedestrian
connec3ons,
circula3on
and
parking
 








10,000,000
 111
Philadelphia PA CDBG City‐wide
Supermarket
Development:
Aquisi3on,
redevelopment,
and
infrastructure
for
supermarket

development
in
underserved
areas. 








10,000,000
 111
Philadelphia PA CDBG The
Mann
Center:
Phase
II
renova3ons
and
construc3on
of
educa3on
center,
concessions,
restroom
facili3es
&

handicapped
access
area 








10,000,000
 111
Philadelphia PA CDBG Chinatown
Community
Center:
Construc3on
of
Chinatown
Community
Center 








10,000,000
 118
Philadelphia PA CDBG Regional
offices
for
human
services:
Crea3on
of
local
offices
for
child
welfare
services
including
advocates
and
court
offices 








10,000,000
 118
Philadelphia PA CDBG Outdoor
Community
Theater:
Reconstruc3on
of
important
Community
Theater
Robin
Hood
Dell 








12,000,000
 141
Philadelphia PA CDBG Capital
improvements
to
health
centers:
Physical
improvements
to
8
neighborhood‐based,
community
health
centers.

This
includes
weatheriza3on,

structural
maintenance,
mechanical
systems
upgrade,
renova3on,
and
upgrading
of
furniture
and
equipment 








15,000,000
 176
Philadelphia PA CDBG Neighborhood
Health
Center:

Construc3on
of
neighborhood
health
center
in
underserved
community
in
Philadelphia
with
high
immigrant

and
uninsured
popula3ons 








15,000,000
 176
Philadelphia PA CDBG Residen3al
facility:
Facility
for
individuals
requiring
skilled
nursing
care
and/or
assistance
with
ac3vi3es
of
daily
living 








15,000,000
 176
Philadelphia PA CDBG Avenue
of
the
Arts
North:
North
Broad

street
infrastructure
and
Streetscape
Improvements 








20,000,000
 222
Philadelphia PA CDBG Demoli3on,
Site
Prepara3on,
and
Greening:
Citywide
demoli3on
of
vacant
and
blighted
proper3es,
site
prepara3on
and
greening 








20,000,000
 222
Philadelphia PA CDBG Dilworth
Plaza:
Construc3on,
infrastructure
improvements
and
other
costs
related
to
the
Dilworth
Plaza

Project. 








20,000,000
 222
Philadelphia PA CDBG Philadelphia
Zoo:
Construc3on,
infrastructure,
and
other
related
costs
for
Children's
Zoo,
Aviary,
Big
Cat
Falls
and
other
exhibits 








20,000,000
 222
Philadelphia PA CDBG Centennial
District:
Construc3on,
infrastructure
improvements
and
other
costs
related
to
the
Centennial

District
Project 








25,000,000
 278
Philadelphia PA CDBG Central
Delaware
Waterfront:
Riverfront
trail,
decking,
finger
piers,
parks,
transit
connec3ons
and
other

development
along
the
Delaware
River 








25,000,000
 278
Philadelphia PA CDBG City‐Wide
Transit
Oriented
Development:
Aquisi3on,
redevelopment,
and
infrastructure
for
transit‐
oriented

development 








25,000,000
 278
Philadelphia PA CDBG Free
Library:
Renova3on
and
expansion
of

regional
branches 








25,000,000
 278
Philadelphia PA CDBG Girard
Avenue
Streetscape
Project:
Streetscape
infrastructure
and
transit
improvement
project
from
Delaware

River
to
33rd
St. 








25,000,000
 278
Philadelphia PA CDBG Schuylkill
River
Park:
Design,
engineering
and
construc3on
of
trail,
pedestrain
overpass,
decking
and
bridging
st

Schuylkill
river 








25,000,000
 278
Philadelphia PA CDBG Commercial
Corrdior
Improvements:
Citywide
commercial
corridor
improvements
including
ligh3ng,
street
trees,
signage,
gateways
and
other 








30,000,000
 333
Philadelphia PA CDBG Hun3ng
Park
Redevelopment:
Planning,
acquisi3on
and
redevelopment
of
Hun3ng
Park
Area 








30,000,000
 333
Philadelphia PA CDBG Library
system
expansion:
Construc3on
of
two
new
regional
libraries
in
north
and
south
sec3ons
of
the
city 








30,000,000
 352
Philadelphia PA CDBG Housing
Produc3on
&
Preserva3on:
Funding
for
preserva3on,
new
construc3on,
acquis3on,
housing

counseling
and
an3‐foreclosure
programs 








50,000,000
 556
Philadelphia PA CDBG Navy
Yard:
Site
prepara3on
and
development
of
the
new
Corporate
Center,
infrastructure
improvements
and

other
projects
at
Naval
Yard 








50,000,000
 556
Philadelphia PA CDBG Revitaliza3on
of
West
Market
Street:
Renova3ons,
construc3on
and
infrastructure
repair
on
the
West
Market

Street
corridor 








50,000,000
 556
Philadelphia PA CDBG Park
and
Recrea3on
capital
investment:
Renova3on
and
deferred
maintenance
of
park
and
recrea3on
facili3es.

Includes
demoli3on
of
condemned
and

abandoned
buildings,
repaving,
trail
construc3on
and
rehabilita3on,
environmental
restora3on,
historic 








70,000,000
 823
Philadelphia PA CDBG Family
Court
Building
Development:
Consolida3on
and
reloca3on
of
the
Family
Court
facility 








75,000,000
 833
Philadelphia PA CDBG Philadelphia
Museum
of
Art:
Reconstruc3on
of
loading
docks
and
other
infrastructure
improvements 








80,000,000
 889
Philadelphia PA CDBG Market
StreetCoordior‐Market
East:
Acquis3on,
Construc3on,
infrastructure
and
related
costs
to
revitalize

Market
Street
Corridor
and
Coven3on
Center
District,
including
adjacent
Chinatown
development 






100,000,000
 1111
Philadelphia PA CDBG Library
Improvements:
Project
comple3on
for
upgrades
and
expansion
of
central
library
 






115,000,000
 1351
Philadelphia PA Energy Exterior
moderniza3on
of
libraries:
Windows
and
roof
replacements
at
all
libraries 










9,000,000

Philadelphia PA Energy Heaters:
Install
2,000
high
efficiency
heaters 










7,000,000

Philadelphia PA Energy Chiller
Replacement:
Philadelphia
Public
Property
Chiller
Replacement
at
Criminal
Jus3ce
Center.
2
year
payback
in
energy
cost

savings
for
replacement
of
inefficient
gas
chillers
with
new
electrical
chillers.(1) 












550,000
 12
Philadelphia PA Energy Triplex
‐
commercial
office
buildings:
Chiller
plant
and
controls
moderniza3on 








15,000,000
 70
Philadelphia PA Energy LED
Lamps:
Replace
incandescent
bulbs
and
ten
year
old
LED
lamps
with
new
all
LED
Lamps
for
3000
signalized

intersec3ons
in
the
City,
which
will
save
the
City
$1,000,000.
per
year
in
energy
cost
(1) 










6,000,000
 94
Philadelphia PA Energy Residen3al
Rehabilita3on:
PGW
Conserva3on
Works
Program
Expansion
and
Redirec3on
for
Residen3al
Rehabilita3on,
removing

structural
barriers
to
energy
conserva3on(2) 










1,000,000
 100
Philadelphia PA Energy Residen3al
Solar
Energy
Revolving
Loan
Fund:
Residen3al
Solar
Energy
Revolving
Loan
Fund
resul3ng
in
ini3a3on
of
solar
projects
at
500
residences
in
city
of

Philadelphia(2) 










4,000,000
 100
City State Program Project
Descrip3on Funding
Required Jobs
Philadelphia PA Energy Weatheriza3on:
Whole
house
weatheriza3on
of
approximately
10,000
homes
in
the
next
12
months
($30m)
and

weatheriza3on
job
training
of
addi3onal
auditors,
insulators,
and
roofers
($4.5m) 








34,500,000
 110
Philadelphia PA Energy City
Hall:
Installa3on
of
modern
HVAC
systems 








20,000,000
 120
Philadelphia PA Housing PHA
Rehabilita3on
&
Development:
Philadelphia
Housing
Authority
public
infrastructure
improvements
including
new
construc3on
and

rehabila3on,
u3li3es,
curbing,
sidewalks
and
landscaping
for
Mill
Creek,
Riverview
and
Paschall
Homes

developments,
amon 








50,000,000
 556
Philadelphia PA Public
Safety Addi3onal
police
facili3es:
Cri3cal
repairs
to
addi3onal
police
facili3es.

PICA
iden3fied
numerous
deficiencies
in
Police
districts
that
are

priori3zed
accordingly:

2%
priority
one;
47%
priority
2;
14%
priority
3;
37%
priority.

PICA
funding
wil 








40,000,000

Philadelphia PA Public
Safety Casino
entertainment
corridor:
Construc3on
of
a
new
combined
50,000
square
foot
facility
to
serve
the
ci3zens
amongst
the
developing

entertainment
corridor
.

The
loca3on
would
include
the
reloca3on
of
the
6th
and
9th
police
districts. 








17,000,000

Philadelphia PA Public
Safety Co‐loca3on
of
services:
Co‐loca3on
of
engine
20,
ladder
23
and
medic
1
for
casino
entertainment
district 










8,000,000

Philadelphia PA Public
Safety Engine
38:
Reloca3on
of
Engine
38 










6,500,000

Philadelphia PA Public
Safety Fire
Academy:
Repairs
to
the
Fire
Academy 










3,500,000

Philadelphia PA Public
Safety Fire
repairs
and
replacement:
Apparatus
repairs
and
replacement 








40,000,000

Philadelphia PA Public
Safety Juvenile
deten3on
facili3es:
Construc3on
of
a
new
juvenile
deten3on
facility
&
cri3cal
repairs
to
exis3ng
facili3es 








30,000,000

Philadelphia PA Public
Safety Officers
for
power
shibs:
400
Officiers
for
Power
Shibs
‐
Desired
force
strength
is
7,000.

Inten3on
to
add
200
officers
not
realized
in
CY

08
due
to
budgetary
constraints.

Addi3onal
400
officiers
would
bring
force
to
desired
strength. 








25,000,000

Philadelphia PA Public
Safety Prison
facility
repairs:
Addi3onal
prison
facility
repairs
‐
upgrades
to
sprinkler
and
security
systems,
various
facili3es 








63,000,000

Philadelphia PA Public
Safety Regional
Training
Center:
Redeveloping
the
Academy
Grounds
into
a
Regional
Training
Center
as
well
provide
for
the
renova3on
of

acquired
federal
government
facili3es
located
at
Woodhaven
Rd.
and
Wissahickon
Ave. 








38,000,000

Philadelphia PA Public
Safety Sta3on
updates:
Addi3onal
sta3on
updates 








32,500,000

Philadelphia PA Public
Safety Public
Safety
Community
Portal:
Improve
public
safety
performance
by
community
groups
through
outreach
to
groups
such
as
PDAC,

Crimewatch,
Townwatch,
fire
block
captains. 










5,000,000
 5
Philadelphia PA Public
Safety Public
Safety
ERP:
Improved
3me
repor3ng
for
3me
management,
scheduling,
and
over3me
payroll
management 








15,000,000
 20
Philadelphia PA Public
Safety Prison
Mgmt
Systems:
Upgrade
informa3on
management
system
to
improve
imate
tracking
and
medical
records. 








10,000,000
 25
Philadelphia PA Public
Safety Infrastructrure
Stability:
Improve
technology
posture
to
improve
stability
and
allow
for
growth. 








15,000,000
 50
Philadelphia PA Public
Safety 911
Infrastructure:
Upgrade
911
systems
to
increase
system
stability
and
performance
and
allow
for
growth. 








20,000,000
 60
Philadelphia PA Public
Safety 800
MHz:
Upgrade
the
digital
public
safety
radio
system
and
implement
new
underground
infrastructure
to

accommodate
the
system 








60,000,000
 110
Philadelphia PA Public
Safety Police
administra3on
building:
Cri3cal
repairs
to
the
police
administra3on
building
including
mechanic,
electrical,
plumbing,
hea3ng
and
air

condi3oning.

This
includes
a
possible
reloca3on
of
Headquarters
to
a
site
at
4601
Market
St.
and
the
poten 








70,000,000
 115
Philadelphia PA Public
Safety Fusion
Center:
Construc3on
and
co‐loca3on
of
police
resources
in
Fusion
Center 








40,000,000
 120
Philadelphia PA Public
Safety Police/Fire
Radio:
Police/Fire
emergency
communica3ons
radio
system
network. 








40,000,000
 120
Philadelphia PA Public
Safety VSS
Fiber
Plant:
Laying
network
of
fiber
to
enable
technologies
such
as
video
surveillance
cameras. 








40,000,000
 125
Philadelphia PA Public
Safety Coloca3on
for
sex
crimes:
Crea3on
of
central,
combined
loca3on
for
police
sex
crimes
unit,
human
services
sex
abuse
services,
and

advocates
for
sexually
abused
and
assaulted
individuals 








12,000,000
 141
Philadelphia PA Public
Safety Electronic
health
record:
Purchase
and
deployment
of
electronic
health
records
across
the
prison
and
linked
health
systems 








15,000,000
 176
Philadelphia PA Public
Safety Integrated
Health
Informa3on
System:
Extend
health
and
opportunity
informa3on
systems
to
integrate
informa3on
mul3ple
agencies
and

departments
(CARES). 








35,000,000
 200
Philadelphia PA Public
Safety Morgue
and
Forensic
Laboratory:
Reloca3on
of
obsolete
medical
examiner
offices,
morgue,
and
laboratory
facili3es. 








40,000,000
 470
Philadelphia PA Public
Safety Underground:
Enabling
access
to
public
safety
radio
system
in
the
subterranean
areas
of
the
city
(subway) 








30,000,000
 500
Philadelphia PA Public
Safety Youth
Study
Center:
Construc3on
of
new
juvenile
deten3on
facility
to
replace
inadequate
and
outdated
exis3ng
facility.

Currently

in
temporary
loca3on. 






110,000,000
 1269
Philadelphia PA Schools Renova3on
and
new
schools:
to
support
renova3on
efforts,
fund
new
school
and
replacement
schools 






150,000,000

Philadelphia PA Streets/Roads Lancaster
Avenue
traffic
signal
improvements:
Traffic
Signal
improvement
project
for
the
Lancaster
Avenue
traffic
corridor. 










3,000,000
 47
Philadelphia PA Streets/Roads East
Coast
Greenway
Ped
Bridge:
Complete
final
design
and
construct
a
pedestrian
bridge
to
allow

unobstructed
access
over
railroad
lines
to
a
por3on
of
the
East
Coast
Greenway
trail
network 










5,100,000
 80
City State Program Project
Descrip3on Funding
Required Jobs
Philadelphia PA Streets/Roads Passyunk
Avenue
Business
Corridor
traffic
signal
improvement:
Traffic
signal
improvement
project
for
the

Passyunk
Avenue
Business
Corridor.

Also
includes
pedestrian

improvements,
curb
bump‐outs,
realignment
and
traffic
island
construc3on. 










7,000,000
 110
Philadelphia PA Streets/Roads Street
Ligh3ng
Pole
Replacement
–
Install
5000
new
fiberglass
streetlight
poles
with
new
energy‐efficient

luminaries
at
exis3ng
loca3ons
as
replacements
for
exis3ng
obsolete
aluminum
poles 








12,500,000
 196
Philadelphia PA Streets/Roads ADA
complaints
ramps:
City
wide
program
to
accelerate
the
installa3on
ADA
compliant
ramps 








30,000,000
 470
Philadelphia PA Streets/Roads Street
Repaving‐Roadway
improvements
for
a
backlog
of
78
miles
of
Federal
Aid
(FAM)
streets;
work
included

the
resurfacing
of
the
streets,
reconstruc3on
of
all
handicap
ramps
to
bring
them
in
compliance
with
new
ADA

requirements;
design
and
placement 








87,500,000
 940
Philadelphia PA Transit Vehicle
Washer
Replacement
‐

Fern
Rock
Shop
and
Frankford
Bus
Garage
‐
This
project
will
provide
for
installa3on
of
new
vehicle
washers
at

Fern
Rock
Rail
Shop
and
Frankford
Bus
Garage.

Exis3ng
washers
at
both
loca3ons
have
been
in
opera3on
for

over 










2,600,000
 99
Philadelphia PA Transit Callowhil/Victory
Bus
Garages
Ven3la3on
System
Improvements
‐

This
project
will
provide
for
the
installa3on
of
a
new
bus
exhaust
systems
and
general
building
ven3la3on

system
improvements
at
the
Callowhill
and
Victory
Bus
Garages.

The
new
bus
exha 










3,000,000
 114
Philadelphia PA Transit Broad
Street
Subway
Sta3ons
‐

This
project
will
provide
for
the
construc3on
of
improvements
to
the
Girard
and
Spring
Garden
Sta3ons
on
the

Broad
Street
Subway
Line.

These
sta3ons
were
originally
constructed
between
1928
and
1932
and
are

showing
sig 








15,900,000
 604
Philadelphia PA Transit Purchase
of
40
Hybrid
Buses
‐
The
SEPTA
Board
awarded
a
contract
to
New
Flyer
of
America,
Inc.
for
the

purchase
of
400
hybrid
(diesel/electric)
buses,
with
an
op3on
to
purchase
20
addi3onal
buses
each
year
for
4

years.

SEPTA
could
quickly
award
an
op3 








17,850,000
 678.3
Philadelphia PA Water Water
Department
Headquarters
‐
Computer
center
HVAC
Upgrade
and
Back‐Up 














85,000
 1
Philadelphia PA Water Eden
St
Stormwater
Ouzall 












300,000
 5
Philadelphia PA Water Stormwater
Deten3on
Basin
Retrofits
Program 












300,000
 5
Philadelphia PA Water Replace
Roof
at
Water
Conveyance
Headquarters
Bldg. 












396,000
 6
Philadelphia PA Water Bureau
of
Laboratory
Services
‐
fencing,
parking,
ligh3ng
and
security
improvements 












600,000
 9
Philadelphia PA Water City
Facili3es
Green
Roof
Program 










1,000,000
 16
Philadelphia PA Water Drainage
Right
of
Way 










1,232,000
 19
Philadelphia PA Water U3lity
and
Channel
Stabiliza3on
Projects
–
Two
projects
to
project
sewer
infrastructure
and
streams
from

impacts
of
erosion. 










1,335,000
 21
Philadelphia PA Water 29th
&
Cambria
Water
Conveyance
Headquarters
Improvements











1,716,000
 27
Philadelphia PA Water City
Facili3es
Green
Infrastructure
Retrofits 










2,000,000
 31
Philadelphia PA Water Water
Department
Facili3es
Green
Infrastructure
Retrofits 










2,000,000
 31
Philadelphia PA Water Biosolids
Recycling
Center 










2,024,000
 32
Philadelphia PA Water Roxborough
Tanks
‐
finished
water
storage
rehabilita3on 










2,200,000
 35
Philadelphia PA Water Green
Schools
Demonstra3on
Projects 










2,500,000
 39
Philadelphia PA Water Flat
Rock
Dam
Rehabilita3on 










2,600,000
 41
Philadelphia PA Water Design
/
Project
Management
/
Geotechnical
Inves3ga3ons
/
Infiltra3on
Tes3ng 










3,000,000
 47
Philadelphia PA Water Southeast
Water
Pollu3on
Control
Plant
Improvements
–
Infrastructure
improvements
and
deferred

maintenance. 










3,009,300
 48
Philadelphia PA Water "I"
Street
&
Ramona
sewer
ouzall
storage
project:
Construc3on
of
a
steel
gate
at
the
ouzall
to
store
combined
sewer
flow
in
the
sewer
and
prevent
it
from

entering
the
stream.
The
stored
sewage
will
be
drained
down
slowly
into
our
system
aber
the
stor 










4,163,250
 65
Philadelphia PA Water West
Philadelphia
sewer
maintenance
facilty 










5,000,000
 78
Philadelphia PA Water Standby
generator
projects
at
Roxborough
Pump
Sta3on
and
Torresdal
Pump
Sta3on 










5,650,000
 89
Philadelphia PA Water Southwest
Water
Pollu3on
Control
Plant
Improvements
‐
Infrastructure
improvements
and
deferred

maintenance. 










6,001,000
 95
Philadelphia PA Water Stream
&
Wetland
Restora3on 










9,000,000
 141
Philadelphia PA Water Cas3ng
and
manholes
adjustments
to
correspond
to
Streets
Department
paving
work 








10,000,000
 157
Philadelphia PA Water Citywide
Street
Tree
Plan3ng
/
Planters
/
Swales 








11,700,000
 183
Philadelphia PA Water Mul3ple
Water
Main
Reconstruc3ons
:
Water
Main
Reconstruc3on
Projects
–
19
projects
across
the
city
to
replace
mains
that
are
approximately
100

years
old.

Projects
are
selected
based
on
a
point
system
that
takes
into
account
the
water
main
age,
#
of
 








12,409,000
 195
Philadelphia PA Water Queen
Lane
Water
Treament
Plant
Improvements 








14,500,000
 228
Philadelphia PA Water Queen
Lane
high
service
pump
sta3on 








15,000,000
 235
Philadelphia PA Water Sewer
Lining
Projects
–
Four
projects
rehabilitate
sewers,
many
more
than
a
century
old,
that
otherwise
are

prohibi3vely
expensive
or
extremely
difficult
to
reconstruct. 








15,900,000
 249
Philadelphia PA Water Baxter
Water
Treatment
Plant

Improvements
‐
Infrastructure
improvements
and
deferred
maintenance. 








16,344,000
 255
Philadelphia PA Water Belmont
Water
Treatment
Plant
Improvements
–
Deferred
facility
maintenance 








25,488,000
 401
Philadelphia PA Water Northeast
Water
Pollu3on
Control
Plant
improvements
‐
infrastructure
and
deferred
maintenance 








26,700,000
 419
Philadelphia PA Water Water
and
Sewer
Reconstruc3on
Projects:

24
projects
across
the
city
to
replace
mains
and
sewers
that
are
approximately
100
years
old.

Projects
are

selected
based
on
a
point
system
that
takes
into
account
the
water
main
age,
#
of
water
main
breaks,
and 








30,735,000
 480
Philadelphia PA Water Manayunk
sewer
overflow
basin 








40,000,000
 627
Philadelphia PA Water Poquessing
Intercep3ng
Sewer
Relief
Project:
Construc3on
of
relief
sewer
to
mi3gate
overflows
 








40,000,000
 627
Philadelphia PA Water Engineering,
construc3on
management
and
administra3on
(15%) 








42,188,888
 661
Pifsburgh PA CDBG Trail
Improvements‐Maintenance
and
repair
work
along
exis3ng
riverfront
trails 










2,000,000
 38
Pifsburgh PA CDBG Beechview
Senior
Center
‐
Renovate
and
open
senior
center
in
Beechview. 












500,000
 43
Pifsburgh PA CDBG Demoli3on/Greening
of
Vacant
Proper3es
‐
City
wide
demoli3on
of
vacant
and
blighted
proper3es,
site

prepara3on
and
greening 










3,000,000
 57
Pifsburgh PA CDBG YMCA
(Hill
District)
‐
Construc3on
of
a
new
YMCA
in
the
City's
Hill
District 










3,500,000
 92
City State Program Project
Descrip3on Funding
Required Jobs
Pifsburgh PA CDBG Point
State
Park
‐
Restora3on
of
historic
park
space
abuqng
CBD. 










4,500,000
 96
Pifsburgh PA CDBG Conven3on
Center
Riverfront
Park
‐
Construc3on
of
park
along
underutlized
riverfront
alongside
the
new

Conven3on
Center











2,000,000
 122
Pifsburgh PA CDBG City‐wide
Clay‐Based
Infields
‐
Replacing
and
adding
Clay‐Based
Infields
at
ballfields
throughout
the
city.











6,550,000
 125
Pifsburgh PA CDBG City‐wide
Playground
Safety
Surfaces
‐

Replacing
playground
safety
surfaces
throughout
the
city.











6,550,000
 125
Pifsburgh PA CDBG Heth's
Run
Restora3on
‐
Create
parkspace
to
convert
underutlized
riverfront
entrance
to
award
winning

regional
zoo. 










7,800,000
 149
Pifsburgh PA CDBG City‐wide
Walls/Landslides
‐
Replacing
walls
and
remedia3ng
landslides
throughout
the
city.











7,300,000
 153
Pifsburgh PA CDBG North
Side
Development
Project
‐
Construc3on
of
a
new
community
center
to
serve
the
City's
North
Side











4,000,000
 183
Pifsburgh PA CDBG South
Side
Works
Riverfront
Park
‐
Development
of
marina,
public
park
and
rivertrail
system
in
support
of
the

$300+
million
South
Side
Works
development 










4,602,224
 260
Pifsburgh PA CDBG Re‐use
of
Vacant
Schools
‐
Adap3ve
reuse,
reconfigura3on
and
rehabilita3on
of
22
closed
schools
into

residen3al/mixed
used
developments 








10,000,000
 391
Pifsburgh PA CDBG Supermarket
Development
‐
Support
of
supermarket
infrastructure
and
development
in
City's
underserved

neighborhoods 








15,000,000
 487
Pifsburgh PA CDBG Youth
Employment
‐
Employ
1000
teenagers
who
work
to
eliminate
blight.

This
year's
program
could
only

accommodate
a
frac3on
of
the
applicants. 










2,700,000
 1000
Pifsburgh PA Energy City‐wide
Court
Ligh3ng
‐
Replacing
and
adding
LED
court
ligh3ng
throughout
the
city.











1,920,000
 37
Pifsburgh PA Energy Confluence
Ligh3ng
‐
Installing
and
upgrading
LED
trail
ligh3ng
city‐wide.











3,000,000
 57
Pifsburgh PA Energy City‐wide
Ballfield
Ligh3ng
‐
Replacing
and
adding
LED
ligh3ng
at
ballfields
throughout
the
city.











6,600,000
 126
Pifsburgh PA Energy Pifsburgh
Green
Innovators
‐
Living
learning
and
earning
center
based
on
cuqng
edge
green
technology.











6,500,000
 748
Pifsburgh PA Housing American
Electric
‐
Public
infrastructure
to
support
31
unit
market
rate
housing
development
on
a
former

brownfield
site 










1,500,000
 29
Pifsburgh PA Housing Wood
Street
Commons
‐
Restore
underu3lized
commercial
space
in
the
CBD
building
which
provides
258

affordable
housing
units 










4,000,000
 76
Pifsburgh PA Housing Federal
North
‐
Redevelopment
of
a
blighted,
historic
block
of
commercial/residen3al
buildings
in
the
heart
of

the
City's
North
Side 










2,000,000
 88
Pifsburgh PA Housing Oak
Hill
Phase
2
‐
Public
infrastructure
to
support
200+
mixed‐income
housing
on
a
former
public
housing
site











6,000,000
 125
Pifsburgh PA Public
Safety 21st
Century
Public
Safety
Facili3es
‐
Renovate
all
public
safety
facili3es
city‐wide.









40,000,000
 764
Pifsburgh PA Streets/Roads Hot
Metal
Bridge
Capacity
Improvement
‐
Add
turning
lane
to
increase
traffic
flow
in
highly
congested
artery
to

the
South
Hills. 












500,000
 10
Pifsburgh PA Streets/Roads City‐wide
Walkway
Ligh3ng
‐
Replacing
walkway
ligh3ng
throughout
the
city.













885,000
 17
Pifsburgh PA Streets/Roads Arena
Walkway
‐
Walkway
near
arena
for
pedestrian
accessibility.











1,200,000
 29
Pifsburgh PA Streets/Roads East
Liberty
Pedestrian
Bridge
‐
Adding
a
pedestrian
bridge
to
connect
East
Liberty
and
Shadyside. 












930,000
 34
Pifsburgh PA Streets/Roads North
Side
Underpasses
‐
Infrastructure
construc3on
for
mul3‐modal
corridor
connec3ons
to
improve
auto,
 










1,500,000
 46
Pifsburgh PA Streets/Roads Mon
Wharf
Switchback
‐
Replacing
parking
spaces
to
connect
the
bike
trail
along
the
Monongahela
River.











2,500,000
 48
Pifsburgh PA Streets/Roads Route
28
Bike
Trail
‐
Construc3on
of
a
riverfront
bike/ped
trail
in
conjunc3on
with
the
Route
28
widening

project. 










1,900,000
 55
Pifsburgh PA Streets/Roads Strip
District
Infrastructure
‐
Public
infrastructure
in
support
of
mixed
use
riverfront
development











3,000,000
 57
Pifsburgh PA Streets/Roads Lexington
Technology
Park
Parking
‐
Demoli3on
of
an
unsafe
warehouse
structure
at
a
office
park
complex
in

Homewood
to
convert
for
added
parking 












500,000
 60
Pifsburgh PA Streets/Roads City‐wide
Brick
and
Blockstone
Restora3on
‐
Replacing
brick
and
blockstone
throughout
the
city.











4,464,000
 85
Pifsburgh PA Streets/Roads City‐wide
Steps
‐
Replacing
steps
throughout
the
city.











4,700,000
 96
Pifsburgh PA Streets/Roads Penn
Avenue
Streetscape
Imp.
‐
Sidewalk,
traffic,
ligh3ng
and
amenity
enhancements
to
Penn
Avenue,
34th
to

Negley.
 










5,000,000
 96
Pifsburgh PA Streets/Roads City‐wide
Concrete
Slab
Replacement
‐
Replacing
concrete
slab
throughout
the
city.











5,265,000
 101
Pifsburgh PA Streets/Roads Market
Square
‐
Redevelopment
of
the
most
prominent
public
square
in
Downtown
Pifsburgh,
suppor3ng
$50

million
development 










2,000,000
 121
Pifsburgh PA Streets/Roads New
Arena
Infrastructure
‐
Public
infrastructure
in
support
of
$311
million
construc3on
of
new
mul3‐purpose

arena 










7,500,000
 143
Pifsburgh PA Streets/Roads City‐wide
Asphalt
‐
Replacing
asphalt
throughout
the
city.









10,000,000
 191
Pifsburgh PA Streets/Roads Wood
Street
Reconstruc3on
‐
Infrastructure
construc3on
Downtown
to
support
expansion
of
Point
Park

University 










5,000,000
 196
Pifsburgh PA Streets/Roads Commercial
Corridor
Improvements
‐
Public
infrastructure
and
gateway
improvements
to
City's
50

neighborhood
commercial
districts 








10,000,000
 441
Pifsburgh PA Streets/Roads South
Side
Works
Parking
Garage
‐
Construc3on
of
600
space
parking
structure
to
support
mix
use

development 








10,000,000
 441
Pifsburgh PA Streets/Roads East
Carson
Street
Widening
‐
Widening
1
mile
of
Carson
Street
to
accommodate
450
million
development.











9,500,000
 767
City State Program Project
Descrip3on Funding
Required Jobs
Pifsburgh PA Streets/Roads Nabisco
Plant
(Bakery
Square)
‐
Public
infrastructure
improvements
adjacent
to
$113
million
mixed
use

redevelopment
of
a
brownfield
site 










5,000,000
 1196
Pifsburgh PA Water Sand
Filters
Rehabilita3on
‐
Replace
Filter
Media
and
Underdrain.
Upgrade
Filter
Control
System















24,800
 0
Pifsburgh PA Water Penguins
Arena
‐
Water
and
Sewer
Infrastructure
Improvements











1,000,000
 19
Pifsburgh PA Water Clarifiers
1,
2
&
3
Sludge
Collector
‐
Replace
Sludge
Collector
Equipment
and
Switchgear











3,900,000
 74
Pifsburgh PA Water Safety
and
Security
Improvements
‐
Repair
Fencing
and
install
security
cameras
treatment
plant
and
basins.











4,500,000
 86
Pifsburgh PA Water Route
28
Reconstruc3on
‐
Reloca3on
of
Water
and
Sewer
Facili3es











6,000,000
 115
Pifsburgh PA Water Filter
Backwash
Recycle
System
‐
Construct
Filter
Backwash
Storage
Tank
and
Recycle
Pump
Sta3on











8,000,000
 153
Pifsburgh PA Water Bruecken
Pump
Sta3on
Improvements
‐
Standby
Power,
21
MGD
Pump
Addi3on,
Replace
Valves,
and
Security

Improvements 








12,000,000
 229
State
College PA Streets/Roads Reconstruc3on
of
North
and
South
Barnard
Street













500,000
 25
State
College PA Streets/Roads Intersec3on
Safety
Improvements
Allen
St/Atherton
St
Intersec3on













750,000
 33
State
College PA Streets/Roads Reconstruc3on
of
100
block
of

South
Fraser
Street
and
Realignment
of
Fraser/Beaver
Intersec3on 










1,000,000
 50
State
College PA Streets/Roads Replace
Deteriorated
Street
Lights
in
Downtown 










2,800,000
 120
Wilkes‐Barre PA CDBG Improvements
to
City
Hall 












500,000
 5
Wilkes‐Barre PA CDBG Improvements
to
DPW
facility 












500,000
 5
Wilkes‐Barre PA CDBG Demoli3on
of
blight 










1,000,000
 20
Wilkes‐Barre PA CDBG Housing
rehabilita3on
program
 










1,000,000
 20
Wilkes‐Barre PA CDBG Parks
and
recrea3on
enhancements
 










3,000,000
 20
Wilkes‐Barre PA CDBG Supplement
to
$14
million
Coal
Street
Park
redevelopment
project 










5,000,000
 25
Wilkes‐Barre PA Public
Safety Citywide
security
camera
ini3a3ve
 










2,000,000
 25
Wilkes‐Barre PA Streets/Roads Downtown
Streetscape
Project
 










3,000,000
 10
Wilkes‐Barre PA Streets/Roads Milling
and
paving
of
various
city
streets 










5,500,000
 10
Wilkes‐Barre PA Streets/Roads Purchase/employ
addi3onal
DPW
equipment/workers 










5,000,000
 10
Wilkes‐Barre PA Streets/Roads Reconstruct
bridges/culverts
citywide 










9,000,000
 10
Wilkes‐Barre PA Streets/Roads Reconstruc3on
of
Wilkes‐Barre
Boulevard 










8,000,000
 10
Wilkes‐Barre PA Streets/Roads "greening"
Wilkes‐Barre
program 












500,000
 15
Wilkes‐Barre PA Streets/Roads Reconstruc3on
of
Public
Square
 










5,000,000
 15
Wilkes‐Barre PA Streets/Roads Spring/Bowman
Run
Channel
upgrades 










5,000,000
 15
Wilkes‐Barre PA Streets/Roads Coal
Street
Road
project
‐
phase
2
 








10,000,000
 25
Wilkes‐Barre PA Streets/Roads Citywide
street
sign
and
pole
replacement 










2,000,000
 30
Wilkes‐Barre PA Streets/Roads Reconstruc3on
of
Laurel
Run
Creek
walls 








10,000,000
 30
Wilkes‐Barre PA Streets/Roads Reconstruc3on
of
Mill
Creek
walls 








10,000,000
 30
Wilkes‐Barre PA Streets/Roads Reconstruc3on
of
Solomons
Creek
walls 








60,000,000
 50
Wilkes‐Barre PA Streets/Roads Intermodal
Transporta3on
Facility/downtown
garage 










3,000,000
 60
Wilkes‐Barre PA Water Citywide
sanitary
sewer
upgrades
 








15,000,000
 30
Wilkes‐Barre PA Water Citywide
storm
sewer
upgrades 








20,000,000
 30
Wilkes‐Barre PA Water Coalbrook
Creek
reloca3on
 








20,000,000
 30
York PA Energy Guaranteed
Energy
Savings
Project 










1,500,000
 15
York PA Streets/Roads Street
resurfacing 










1,000,000
 15
York PA Water York
City
WWTP
upgrades 








15,000,000
 30
Anasco PR CDBG Construc3on
of
a
conven3on
center
to
house
commercial
and
business
promo3on
exhibits,
professional

conven3ons
and
other
related
ac3vi3es. 










8,000,000
 100
Anasco PR CDBG Rehabilita3on
and
expansion
of
the
City
market
square
which
is
actually
closed
for
business. 










6,500,000
 100
Anasco PR CDBG Construc3on
of
high
tech
and
sustainable
energy
careers
ins3tute
in
joint
venture
with
higher
educa3on

in3tu3on
Eastern
University.
Project
will
provide
high
tech
and
sustainable
enerty
career
opportunites
to

underserved
area. 










6,000,000
 150
Anasco PR CDBG Construc3on
of
a
condo‐hotel
in
the
jurisdic3on's
coastal
zone
providing
new
rooms
availability
to
the
area. 










7,000,000
 200
Anasco PR Streets/Roads Project
to
connect
PR
30
with
PR
2
allevia3ng
traffic
conges3on
providing
road
transporta3on
alterna3ves
to

already
jammed
residen3al
areas. 










3,000,000
 75
Anasco PR Water Water,
wastewater
and
sewer
rehabilita3on
for
downtown
Anasco
to
serve
exis3ng
business
and
commerce,

and
allow
construc3on
of
new
commercial
and
business
facili3es. 










6,500,000
 250
Arroyo PR CDBG Construc3on
of
new
roads,
expansion
and
rehab
of
the
rural
road
system.
Project
will
acelerate
and
enhance

communica3ons
from
the
urban
area
to
the
rural
communi3es. 












700,000
 75
Arroyo PR CDBG Construc3on
of
3
community
services
centers.
Project
will
serve
3
low
income
communi3es
bringing

community
assistance
to
underserved
popula3on. 












500,000
 100
Arroyo PR CDBG Construc3on
of
3
Head
Start
facili3es
at
a
cost
of
$450,000
each
in
order
to
expand
program
and
assist

underserved
popula3on.
Project
will
benefit
90
children. 










1,350,000
 150
Barceloneta PR CDBG Construc3on
of
parking
facili3es
in
downtown
Barceloneta
providing
space
for
400
vehicles.
Project
will

alleviate
urban
traffic
conges3on
bringing
needed
infrastructure
to
downtown
commercial
development.
It
is

another
ready
to
go
project
which
counts
 










5,800,000
 100
Barceloneta PR CDBG Funding
to
create
a
revolving
fund
to
finance
ready
to
go
housing
projects
for
underserved
popula3on.

Revolving
fund
will
provide
financing
for
underfunded
projects
due
to
financial
crisis.
Housing
projects
will

provide
rental
housing
and
low
income
hous 








20,000,000
 300
Barceloneta PR Energy Solar
power
system
installa3on
in
public
building
housing
local
government
program
service
offices.
Project

will
reduce
City
expenditures
and
dependency
on
electric
power
based
on
fossil
fuel. 










1,000,000
 25
City State Program Project
Descrip3on Funding
Required Jobs
Barceloneta PR Water Rehabilita3on
of
aging
waste
water
sewer
system
in
Barceloneta's
urban
core.
Project
will
expand
capacity

serving
the
urban
area
permiqng
new
connec3ons
to
the
system.
Projected
service
expansion
will
allow
the

development
of
new
land
rescued
to
the
f 










1,000,000
 75
Barceloneta PR Water Construc3on
of
new
waste
water
sewer
system
at
Garrochales
ward.
Project
will
provide
services
to
1,500

families,
small
businesses,
and
industrial
facili3es.
Further
economic
development
requires
the
construc3on
of

this
sewer
system.
Project's
Phase
is 










5,000,000
 100
Caguas PR CDBG Head
Start
Center
Villas
del
Rey 










1,000,000
 40
Caguas PR CDBG Construc3on
of
neighborhood
center
and
facili3es
and
street
improvements 










2,000,000
 50
Caguas PR CDBG Improvements

and
construc3on
of
recrea3onal
facili3es
and
gazebos
in
the
Municipal
Parks











1,000,000
 60
Caguas PR CDBG Water
Flood
Mi3ga3on
of
Ravine
Los
Muertos 












800,000
 100
Caguas PR CDBG Ecologic
Corridor
Between
Aguas
Buenas
Cave
System
and
Cultural
and
Botanical
Garden











1,700,000
 150
Caguas PR Energy Installa3on
of
solar
panels
and
renewable
energy
system
on
Villa
Turabo
Housing










12,000,000
 150
Caguas PR Housing Demoli3on
and
construc3on
of
José
Gau3er
Benítez
Public
Housing









55,000,000
 400
Caguas PR Public
Safety Recrui3ng
addi3onal
police
officers 










3,000,000
 40
Caguas PR Public
Safety Installa3on
of
a
Closed
circuit
cameras
system
in
the
Central
Business
District
Center 










4,000,000
 50
Caguas PR Schools Moderniza3on
and
Rehabilita3on
of
José
Gau3er
Benítez
School 










4,000,000
 70
Caguas PR Streets/Roads Construct
two
lanes
and
Improve
roadway
and
sidewalk
addi3on
to

State
highway
#96 










3,000,000
 50
Caguas PR Streets/Roads Improvement
of
roadway
and
sidewalk
at
Degetau
Avenue 










2,000,000
 60
Caguas PR Streets/Roads Improvement
of
street
J
in
Morales
Ward 










1,000,000
 60
Caguas PR Streets/Roads Improvement
of
Central
Business
District
streets
and
sidewalks 








10,000,000
 200
Caguas PR Streets/Roads Construc3on
and
Improvements
of
rural
roads,
bridges,
asphalt
roads,
sidewalks
and
urban
streets 










8,000,000
 300
Caguas PR Streets/Roads Purchase
of
buses
and
equipment,
restore
facili3es
and
pavement
markings
to
establish
Transcriollo
Public
 








20,000,000
 300
Caguas PR Transit Infrastructure
construc3on,
rail
system
installa3on,
and
rail
cars
purchase
for
a
Train

System
from
Caguas
to

Cupey
Sta3on
in
Rio
Piedras 






350,000,000
 500
Caguas PR Water Improvement
of
sanitary
sewer
and
water
system
in
the
Central
Business
District
Center









10,000,000
 200
Camuy PR CDBG Construc3on
of
a
sport
arena,
and
sport
complex
to
provide
space
for
professional
sports
presenta3ons,

business
exhibits,
and
sport
ac3vi3es
for
the
general
public. 








10,000,000
 50
Camuy PR CDBG Second
phase
construc3on
of
the
local
fiherman's
wharf
includes
the
construc3on
of
storage
and
cleaning
 










2,570,000
 135
Camuy PR CDBG Construc3on
of
new
wastewater
sewage
facili3es
along
PR
2,
Puente
ward,
and
the
City's
urban
area
to
serve

2,500
households
and
small
business. 








13,668,505
 275
Ciales PR CDBG Improvements
to
library
facili3es
at
urban
area
core.
The
project
consists
of
improvements
to
exis3ng
facili3es

structure
which
urgently
need
rehabilita3on 












400,000
 12
Ciales PR CDBG Cleaning
of
80+
years
channel
creek. 












500,000
 14
Ciales PR CDBG Rehabilita3on
of
old
structures
to
meet
currrent
demand
for
commercial
as
well
as
moderate
income
housing

in
downtown
area. 












500,000
 14
Ciales PR CDBG Rehabilita3on
of
a
downtown
Farmer
Market. 












600,000
 17
Ciales PR CDBG Rehabilita3on
of
an
extension
of
City
Hall
Administra3ve
Building 










4,000,000
 40
Ciales PR CDBG Moderate
rehabilita3on
of
at
least
100
housing,
according
to
construc3on
codes,
in
differents
wards.

Construc3on
of
sep3c
tanks
if
needed. 










1,500,000
 42
Ciales PR CDBG Reloca3on
of
aerial
electric
and
other
u3li3es
to
underground
in
downtown
area. 










5,000,000
 50
Ciales PR CDBG Construc3on
of
54
apartments
at
downtown
area. 










5,400,000
 54
Ciales PR CDBG Crea3on
of
a
revolving
fund
to
provide
financial
assistance
to
small
business
that
creates
or
maintains
jobs 










8,400,000
 84
Ciales PR Energy Conversion
of
public
parks
and
other
facili3es
to
LED
ligh3ng 










2,000,000
 20
Ciales PR Energy Construc3on
of
the
second
phase
of
bicycle
path
next
to
Grande
de
Mana3
River.
The
second
phase
will

connect
with
the
exis3ng
recrea3onal
facili3es. 










3,000,000
 90
Ciales PR Public
Safety Adquisi3on
and
maintenance
of
satelite
sensors
and
alarm
system
to
the
Grande
de
Mana3
River
to
safe
lives

during
floodwater 












200,000
 6
Ciales PR Public
Safety Community
Policing‐Up‐to‐date
equipment
for
the
Ciales
Police
Department,
including
digital
cameras,

upgraded
ballis3c
protec3on
vests,
and
crime
suppression
patrol
staffing 












500,000
 30
Ciales PR Streets/Roads Sidewalks,
cubs
and
repavement
improvements
of
municipal
roads
for
different
wards
and
downtown
area. 










3,000,000
 30
Ciales PR Transit City‐wide
Transit‐oriented
Development‐acquisi3on,
redevelopment,
and
infrastructure
for
transit‐oriented

development 












700,000
 20
Ciales PR Water
Ciales PR Water Sewer
replacement
80+
year‐old
sewer
infrastructure;
install
a
new
one
with
higher
capacity
which
will
help

avoid
poten3al
sewer
discharge 










3,600,000
 100
Ciales PR Water Water
Distribu3on
System
Improvements
‐
This
project
would
replace
old
cast
water
mains
that
have
reached

the
end
of
their
useful
service
lives 










1,200,000
 100
Ciales PR Water Construc3on
of
the
first
phase
of
17
kilometer
of
sewer
infrastructure
in
Cordillera
and
Fronton
wards. 








25,500,000
 255
Cidra PR CDBG Acquire
land
to
increase
Hotel
Treasure
Island 










1,500,000
 43
Cidra PR CDBG Acquire
Proper3es
for
redevelopment
for
low
income
housing 










1,500,000
 43
Cidra PR CDBG Improve
track
and
land
for
lifle
league
parking 






150,000,000
 43
Cidra PR CDBG Construc3on
of
swales
in
various
wards 










3,000,000
 86
Cidra PR CDBG Acquire
land
to
increase
municipal
cemetary 










4,000,000
 114
Cidra PR CDBG Acquire
land
for
low
income
facili3es 










5,000,000
 143
Cidra PR CDBG Acquire
Proper3es
for
proper3es
city
baseball
stadium 








15,000,000
 428
Cidra PR CDBG Construc3on
of
New
Culture
Art
Center 








15,000,000
 428
Cidra PR CDBG Familiy
Recrea3on
Park
Facility 








15,000,000
 428
Cidra PR Energy Solar
water
Heaters
for
rural
area
families 






500,000,000
 14
Cidra PR Energy Install
solar/wind
in
all
city
recrea3on
facili3es 










2,000,000
 48
City State Program Project
Descrip3on Funding
Required Jobs
Cidra PR Energy Install/Solar
wind
in
all
city
facili3es 










2,000,000
 48
Cidra PR Energy Study
Construct
Methean
gas
sta3on
on
city
closed
land
fill 








35,000,000
 1000
Cidra PR Energy New
Energy
Efficiency
Industrial
Zones
100
Acres 


17,500,000,000
 1628
Cidra PR Housing Demoli3on
and
redevelopment
of
Jardines
Public
Housing
Project 








20,000,000
 561
Cidra PR Housing Demoli3on
and
redevelopment
of
praxedes
san3ago
public
housing
project
in

sustainable
housing
project 








20,000,000
 561
Cidra PR Public
Safety Installa3on
of
Security
Cameras
in
all
Recreea3onal
facili3es. 






100,000,000
 29
Cidra PR Public
Safety Installa3on
of
Security
Cameras
in
all
Public
Facili3es. 










1,500,000
 43
Cidra PR Schools Construc3on
of
University
of
The
Arts 










2,500,000
 714
Cidra PR Streets/Roads Construc3on
of
Bridge
in
Rio
Abajo
Ward 










2,000,000
 57
Cidra PR Streets/Roads Repavement
of
State
Route
in
city
boundary 










3,000,000
 86
Cidra PR Streets/Roads Construc3on
final
phase
city
inner
loop 










6,000,000
 171
Cidra PR Streets/Roads New
Bridge
construc3on
outer
loop 










7,000,000
 200
Cidra PR Streets/Roads Widen
Route
172
to
inner
city 








20,000,000
 561
Cidra PR Streets/Roads Construc3on
of
phases
1,2
and
three
of
outer
loop 








25,000,000
 714
Cidra PR Streets/Roads Construc3on
of
new
highway
connec3ng
to
PR‐Rate
52 








60,000,000
 1700
Cidra PR Transit Connect
Transporta3on
to
PR‐Rate
7733 










2,000,000
 57
Cidra PR Transit New
Transportaion
Center 










2,000,000
 57
Cidra PR Transit Expanded
Transporta3on
Terminal 










3,000,000
 86
Cidra PR Water Construct
waste
water
sewer
for
Beatriz
Ward 














25,000
 714
Cidra PR Water Reconstruct
water
and
sewer
drains
in
city
downtown
area 








30,000,000
 857
Corozal PR CDBG CONTRUCTION
OF
A
MUNICIPAL
THEATER
IN
THE
URBAN
ZONE
AT
COROZAL
PUERTO
RICO.
THIS
PROJECT
WILL
BE
CONSTRUCTED
AS
PART
OF
A
REVITALIZATION
OF
THE
URBAN

ZONE
IN
COROZAL
PUERTO
RICO
FOR
CULTURAL,
FINE
ARTS
ARE
OTHER
ACTIVITIES
THAT
WILL
HELP
SERVE
AS

AN
ATR 










2,000,000
 45
Corozal PR CDBG REVITALIZATION
OF
CITY
SQUARE
AT
COROZAL,
PUERTO
RICO.THIS
PROJECT
INCLUDES
UNDERGROUND

ELECTRICAL.TELEPHONE,CABLE
TV
WORK
AND
RECONSTRUCTION
OF
THE
CITY
SQUARE 










7,000,000
 75
Corozal PR CDBG IMPROVEMENTS
TO
LIBRARY
FACILITIES
AT
URBAN
CORE
COROZAL
PUERTO
RICO
PROJECT
CONSIST
OF

IMPROVEMENTS
TO
EXISTING
FACILITIES
STRUCTURE
WHICH
URGENTLY
NEEDS
REHABILITATION
OF
SOME

AREAS
WHICH
IS
DETERIORATED
DUE
TO
USE
AND
CLIMATE
FACTORS.
PROJECT
HAS
ALL
P 












400,000
 80
Corozal PR CDBG IMPROVEMENTS
TO
COVERED
BASKETBALL
COURT
AT
STATE
ROAD
159
COROZAL
PUERTO
RICO.THIS
PROJECT

INCLUDES
ADDITIONAL
SPACE,REMODELLING
EXISTING
STRUCTURE,INSTALLATION
OF
HIGH
EFFICIENCY
AIR

CONDITION,AND
CONSTRUCTION
OF
MULTY
STORY
PARKING 










9,000,000
 85
Corozal PR CDBG COMMERCIAL
OFFICES
AT
URBAN
CORE
COROZAL
PUERO
RICO
PROJECT
CONSIST
CONSIST
IN
THE

CONSTRUCTION
OF
A
THREE
STORY
BUILDING
THAT
WILL
CREATE
COMMERCIAL
LEASE
SPACES
IN
THE
URBAN

AREA
WERE
THE

SMALL
TRADITIONAL
ARE
LOCATED.
THE
LAND
WERE
THE
PROJECT
IS
PROP 










7,800,000
 250
Corozal PR Energy REPLACEMENT
OF
ELECTRICITY
POLES
WITH
ENERGY
EFFICIENCY
IN
DIFFERENT
WARDS
OF
COROZAL,PUERTO

RICO 










2,000,000
 45
Corozal PR Public
Safety 
VIDEO
MONITORING
SURVAILLANCE
SYSTEM
AT
COROZAL,
PUERTO
RICO
 










1,000,000
 20
Corozal PR Public
Safety HIRING
OF
NEW
MUNICIPAL
POLICE
TO
EXTEND
SERVICE
PROTECTION
IN
OTHER
WARDS
IN
THE
MUINICIPALITY
OF
COROZAL
PUERTO
RICO

AND

ADQUISITION
OF
LAW
ENFORCE
EQUIPMENT
AND
TECHNOLOGY 










1,100,000
 28
Corozal PR Streets/Roads REPAVEMENT
OF
MUNICIPAL
ROADS
AT
DIFFERENT
WARDS
AND
DOWNTOWN

COROZAL,PUERTO
RICO 










3,000,000
 90
Corozal PR Transit CONSTRUCTION
OF
MASS
TRANSPORTATION
BUILDING
AT
URBAN
ZONE
COROZAL
PUERTO
RICO 










5,000,000
 80
Corozal PR Water CONSTRUCTION
OF
SANITARY
SEWER
SYSTEM
AT
VALLE
ARAMANA
COMMUNITY
COROZAL
PUERTO
RICO 










3,000,000
 50
Corozal PR Water CONSTRUCTION
OF
SANITARY
SEWER
SYSTEM
AT
GUARICO
COMMUNITY
PALMAREJO
WARD,
COROZAL

PUERTO
RICO.THE
THE
PROJECT
CONSIST
OF
CONSTRUCTION
OF
SANITARY
SEWER
TO
INSTALL
446
HOUSE
CONNECTIONS
IN
AN

AREA
NEAR
THE
URBAN
ZONE.DESIGN
AND
ALL
NECESARY
ENGINNERING
S 










4,827,000
 60
Guanica PR CDBG Reconstruc3on
of
historic
lighthouse,
construc3on
of
new
sewage
and
sanitary
systems,
and
construc3on
of

commercial
facili3es. 










6,000,000
 40
Guanica PR CDBG Development
of
a
50
rooms
hotel
in
the
old
town's
district
to
increse
tourist's
offer
in
Guanica. 










5,000,000
 90
Hormigueros PR CDBG Construc3on
of
park
in
residen3al
area
within
downtown
to
serve
families
with
small
children. 












500,000
 20
Hormigueros PR CDBG Rehab
of
old
train
sta3on
to
develop
the
local
museum
of
transporta3on. 












500,000
 25
Hormigueros PR CDBG Hotel
development
in
the
old
sugar
mill.
Project
will
be
operated
by
the
City
crea3ng
new
jobs
genera3ng

recurrent
income
for
the
local
government. 










5,000,000
 40
Hormigueros PR CDBG Rehab
of
historic
building
and
conversion
into
a
community
service
center. 












700,000
 40
Hormigueros PR CDBG Channeliza3on
of
2
creeks
that
split
urban
communi3es
which
cause
recurrent
flooding
whenever
hurricanes

and
tropical
systems
associated
with
heavy
rains
affect
the
Island.
Recurrent
flooding
are
a
constant
menace
to

lives
and
property
in
this
communi3 










2,000,000
 50
Hormigueros PR CDBG Landfill
expansion
and
equipment
acquis3on
to
expand
use
of
the
facili3es. 










2,800,000
 52
Hormigueros PR CDBG Construc3on
of
a
community
service
center
to
provide
assistance
to
underserved
popula3on
in
the
rural
area. 












600,000
 57
Hormigueros PR CDBG Construc3on
of
a
mul3purpose
building
to
provide
access
to
city
government
assistance
programs
to

underserved
popula3on. 










1,000,000
 75
Hormigueros PR CDBG Construc3on
of
community
service
center
to
provide
assistanc
to
underserved
popula3on
in
the
rural
area. 










1,000,000
 75
Hormigueros PR CDBG Construc3on
of
gymnas3c
pavillion
to
hold
interna3onal
compe3ons
genera3ng
tourists
flow
associated
with

sport
events. 










1,500,000
 80
Hormigueros PR CDBG Rehabilita3on
and
expansion
of
local
theater. 










2,000,000
 85
Hormigueros PR CDBG Rehabilita3on
of
abandoned
industrial
building
to
develop
a
mul3purpose
facility
for
small
businesses,
and

other
commercial
and
small
industries
facility. 










2,500,000
 90
Hormigueros PR CDBG Expansion
of
local
sport
arena
enabling
the
City
to
bring
new
events
to
the
area.
Project
will
increase
the

number
of
events
raising
the
number
of
afendants
,
and
genera3ng
more
economic
ac3vity. 










2,000,000
 100
City State Program Project
Descrip3on Funding
Required Jobs
Hormigueros PR CDBG Flood
control
project
to
stop
recurrent
flooding
caused
by
Rio
Guanajibo
during
the
hurricane
season.

Numerous
Presiden3al
disaster
declara3on
have
been
issued
in
the
past
decade.
Project
will
end
heavy

economic
and
lives
losses. 










4,000,000
 100
Hormigueros PR CDBG Streets
and
sidewalk
construc3on,
installa3on
of
solar
powered
luminaries,
and
subs3tu3on
of
the
exis3ng

system
across
the
urban
core. 










7,000,000
 100
Hormigueros PR CDBG Construc3on
of
parking
building
for
300
vehicles
providing
the
infrastructure
needed
for
the
town
economic

development.
Project
will
alleviate
traffic
conges3on. 










5,000,000
 105
Hormigueros PR CDBG Rehabilita3on
of
City
Government
building
and
adjacent
construc3on
of
new
building
to
rent
commercial

space
to
small
businesses.
Construc3on
of
parking
facili3es
within
the
premises
to
provide
parking
space
to

poten3al
clients.
Urban
mini‐mall
will
b 










2,000,000
 150
Hormigueros PR CDBG Crea3on
of
a
revolving
fund
to
finance
ready
to
go
low
income
developments
which
have
not
started
due
to

lack
of
funding
caused
by
the
financial
crisis.
Financing
will
also
be
available
for
small
businesses,
sustainable

energy
projects,
and
small
high
te 








15,000,000
 300
Hormigueros PR Energy Installa3on
of
solar
pannels
in
all
City
buildings
moving
the
local
government
from
the
use
of
fossil
fuel
energy

resources
to
sustainable
energy. 










1,500,000
 60
Hormigueros PR Housing Construc3on
of
a
rental
housing
facility
for
the
elderly
to
be

operated
under
rental
assistance
programs.

Project
will
provide
120
housing
units
for
low
income
persons
with
age
from
62
years
old
on.
 








12,000,000
 153
Hormigueros PR Public
Safety Purchase
of
computer
communica3ons
system
in
order
to
connect
community
policing
and
emergency

vehicles
to
state
and
Federal
public
safety
agencies. 












300,000
 10
Hormigueros PR Public
Safety Purchase
and
installa3on
of
video
cameras
in
high
crime
areas,
and
purchase
of
communica3on
system
to

manage
informa3on
received. 












500,000
 15
Hormigueros PR Public
Safety Purchase
of
vehicles
for
community
policing
and
emergency
services. 












700,000
 25
Hormigueros PR Streets/Roads Construc3on
and
rehab
of
the
local
street
system
to
provide
new
access
to
town
and
commercial
district.

Construc3on
of
new
bridges
in
the
rural
area
subs3tu3ng
exis3ng
deteriorated
infrastructure. 










2,500,000
 85
Hormigueros PR Transit Purchase
of
buses
and
street
cars
to
provide
public
transporta3on.
 












500,000
 20
Hormigueros PR Water Construc3on
of
new
wastewater
sewer
system
townwide
rehabilita3ng
exis3ng
aging
system
with
recurrent

overflows. 










5,000,000
 65
Juana
Diaz PR CDBG The
construc3on
of
the
new
Historic
Museum
Casa
Zambrana
at
the
Urban
Area. 










5,000,000
 30
Juana
Diaz PR CDBG New
Mini
Baseball
Stadium
at

RIO
CAÑAS
ABAJO
Ward.Construc3on
af
a
new
mini
baseball
stadium
with

cafeteria
areas,
communica3on
area,
parking
lot,
and
a
grand
stand
for
500
persons.

 










2,000,000
 40
Juana
Diaz PR CDBG New
Mini
Baseball
Stadium
at
AGUILITA
Ward.
Construc3on
af
a
new
mini
baseball
stadium
with
cafeteria

areas,
communica3on
area,
parking
lot,
and
a
grand
stand
for
500
persons. 










2,000,000
 40
Juana
Diaz PR CDBG New
Reacrea3onal
and
Pasive
Children
Park
El
SUEÑO
DE
LOS
NIÑOS.
The
construc3on
of
a
new
pasive
and

recrea3onal
park
with
play
ground
equipment
ADA
complain.
New
Gazebos,
Cafeteria,
Kiosks,
and
Parking
Lot.
 










2,000,000
 40
Juana
Diaz PR CDBG Construc3on
of
a
new
atle3c
Track
in
compliance
with
the
American
Amateur
Atle3c
Associa3on 










2,500,000
 50
Juana
Diaz PR CDBG New
Touris3c
and
Pasive
Park
at
Salto
de
Collores
ward.
The
construc3on
of
a
new
pasive
and
recrea3onal
park

with
play
ground
equipment
ADA
complain.
New
Gazebos,
Cafeteria,
Kiosks,
and
Parking
Lot.
 










3,000,000
 60
Juana
Diaz PR CDBG Rehabilita3on
of
a
Beachfront
Touris3c
Area
at
Camboya
Ward.

Improvements
to
gacebos,
bathrooms,

lifesaver
offices,
and
a
construc3on
of
a
wavebraker.
 








20,000,000
 60
Juana
Diaz PR CDBG Improvements
to
Raul
Torres
Stadium.
The
improvements
includes
a
new
grand
stand,
new
cafeteria
areas,

new
communica3on
and
transmi3osn
system
and
new
ligh3ng
system.

Also,
we
will
have
improvements
on

the
playing
field. 










5,000,000
 150
Juana
Diaz PR CDBG The
construc3on
of
a
new
Conven3on
Center
with
a
capacity
of
2,000
persons
including
parking
spaces
for
350

vehicles.

The
fascili3es
will
have
a
main
room,
and
4
smaller
rooms
for
other
ac3vi3es.
 








15,000,000
 150
Juana
Diaz PR CDBG Construc3on
of
the
new
fascili3es
for
the
Municipal
Services
Departments
and
for
the
Mayor
Administra3ve

Offices.
 








10,000,000
 200
Juana
Diaz PR Energy Underground
Installa3on
of
the
Electrical
Lines
and
other
U3li3es
Insfraestructure.
 








12,000,000
 80
Juana
Diaz PR Housing Improvements
and
repairs
of
more
than
200
houses
at
the
urban
area
for
low
income
individuals.
 








30,000,000
 200
Juana
Diaz PR Public
Safety Construc3on
of
the
new
fascili3es
for
the
Municipal
Police
Departments,
Municipal
Emergency
Management

Agency
and
Medical
Emergency
911
Office.
 










3,000,000
 60
Juana
Diaz PR Public
Safety The
construc3on
of
the
new
offices
for
the
Director
and
other
execu3ves
of
the
Public
Works
Department
with

an
ample
parking
space.

The
fascilli3es
will
include
the
workshops
for
the
repairment
of
all
municipal
vehicles.












5,000,000
 60
Juana
Diaz PR Transit Construc3on
of
bridge
over
PR‐149
Street
to
improve
the
service
level
and
traffic
of
PR‐14
and
PR‐149
 








15,000,000
 100
Juana
Diaz PR Transit Construc3on
of
connector
from
PR‐143
to
PR‐512
and
improvements
with
an
approximate
2,500
meters
 








10,000,000
 200
Juana
Diaz PR Water The
construcc3on
of
open
channel
on
aproximatelly
4
kilometers
of
the
Jacaguas
Pluvial
System. 










3,000,000
 60
Juana
Diaz PR Water Furnishing
and
installa3on
gravity
PVC
Pipeline,
concrete
manholes
and
sewer
service
connec3on.
Sanitary

System
for
Lago
Horizonte
and
Olla
Honda
Communi3es
 










4,000,000
 80
Juana
Diaz PR Water The
construcc3on
of
open
channel
on
aproximatelly
10
kilometers
of
the
Jacaguas
River. 








50,000,000
 200
Lares PR CDBG Wastewater
sewage
system
for
the
Piletas
and
Callejones
wards.
It
will
benefit
2,103
households
and
500

commercial
and
small
business
entrepeneurs. 










6,000,000
 250
Las
Marias PR CDBG Construc3on
of
sports
complex
to
provide
facili3es
to
townwide
popula3on. 










1,900,000
 53
Las
Marias PR CDBG Rehabilita3on
of
energy
and
communica3on
lines
within
the
town's
urban
core
including
installa3on
of

photovoltaic
luminaries,
and
streets
and
sidewalks
expansion. 










5,000,000
 100
Las
Marias PR CDBG Construc3on
of
new
plaza
at
the
urban
core
to
serve
commerce
and
office
space
created
in
the
area. 










2,000,000
 105
Las
Marias PR CDBG Electronic
library
to
serve
local
student
popula3on.
Lack
of
internet
access
have
become
an
obstacle
to
school

reten3on
programs
increasing
school
deser3on
rate. 












930,000
 125
Las
Marias PR CDBG Construc3on
of
94
housing
project
for
the
elderly
to
provide
rental
housing
to
underserved
popula3on. 








10,000,000
 153
Las
Marias PR CDBG Construc3on
of
parking
facili3es
for
400
vehicles
within
the
urban
core.
Project
will
serve
local
residents
and

visitors
providing
parking
space
in
an
already
crowded
area. 










4,750,000
 160
Las
Marias PR CDBG Construc3on
of
fine
arts
facili3es
and
adjacent
parking
building. 










3,700,000
 175
Las
Marias PR CDBG Construc3on
of
day
care
facili3es
for
the
elderly.
New
facili3es
will
provide
medical,
recrea3onal,
and

nutri3onal
assistance
to
low
income
elderly
individuals
and
families. 










2,120,000
 200
Las
Marias PR CDBG Construc3on
of
building
to
provide
rental
space
to
state
government
service
programs,
service
office,
and

small
businesses.
Project
will
bring
economic
development
alterna3ves
to
a
depressed
area. 










2,720,000
 300
City State Program Project
Descrip3on Funding
Required Jobs
Las
Marias PR CDBG Construc3on
of
new
market
facili3es
to
provide
low
cost
business
space
for
commercial
exchange
of

agroindustrial
produce.
Project
will
increase
local
trade
and
bring
new
recurrent
income
to
the
City

government. 










1,575,000
 300
Las
Marias PR Public
Safety Acquis3on
of
vehicles
safety
equipment
to
expand
policing
and
emergency
services
to
local
popula3on. 










1,350,000
 125
Las
Marias PR Streets/Roads Connec3on
of
PR
119
and
urban
area
enhancing
accessibility
to
the
area
bringing
much
needed
road

infrastructure.

 










2,750,000
 100
Las
Marias PR Streets/Roads Construc3onn
of
new
road
and
bridge
to
connect
rural
areas
with
school
and
residen3al
area
in
Las
Marias

urban
core.
Project
will
reduce
traffic
conges3on
in
the
urban
area
opening
new
access
to
the
City. 










7,000,000
 150
Mana3 PR CDBG Construc3on
of
community
services
center
to
provide
assistance
and
access
to
community
programs
to

underserved
popula3on. 












200,000
 10
Mana3 PR CDBG Construc3on
of
12
baseball
parks
to
serve
12
communi3es
townwide. 












600,000
 20
Mana3 PR CDBG Construc3on
of
12
basketball
courts
to
serve
12
communi3es
townwide. 










1,200,000
 20
Mana3 PR CDBG Construc3on
of
2
community
libraries
to
serve
community
schools
popula3on
and
rural
area
families.
 












800,000
 20
Mana3 PR CDBG Construc3on
of
community
police
sta3on
at
Boquilla
community
serving
1,400
families. 










1,000,000
 20
Mana3 PR CDBG Construc3on
of
community
police
sta3on
to
provide
community
policing
services
to
high
crime
rate
area
at
PR

149. 










1,000,000
 20
Mana3 PR CDBG Construc3on
of
conven3on
center
facili3es
to
serve
local
popula3on
providing
space
for
professional

conven3ons,
industrial
and
commercial
exhibits,
agriculture
and
housing
development
ac3vi3es,
and

professional
seminaries.
 










4,000,000
 52
Mana3 PR Energy Installa3on
of
photovoltaic
light
system
from
PR
2
to
downtown
Mana3
thus
reducing
electric
power

consump3on
streaming
the
City
budget. 










2,000,000
 25
Mana3 PR Streets/Roads Construc3on
of
ramp
connec3ng
highway
PR
22
to
secondary
road
PR
686.
This
connec3on
will
increase

accesibility
to
the
Mana3
metroplex
allevia3ng
transit
in
the
only
2
exis3ng
connectors. 










1,700,000
 20
Mana3 PR Streets/Roads Improvements
to
PR
686
to
order
exis3ng
traffic
conges3on
in
the
area. 












500,000
 20
Mana3 PR Streets/Roads Widening
of
PR
670
from
the
Ci3es
of
Mana3
to
Vega
Baja
reducing
commu3ng
3me
between
the
2
areas,
and

facilita3gn
communica3ons
between
industrial
and
agriculture
development
poles. 










2,000,000
 30
Mana3 PR Streets/Roads Widening
of
PR
686
to
PR
2
providing
addi3onal
lanes
to
already
jammed
road. 










3,000,000
 35
Mana3 PR Water Construc3on
of
flood
control
project
at
el
Tanque
and
Boquilla
communi3es
to
stop
economic
losses
and
risk

to
lives
and
property
due
to
recurrent
hurricane
and
storm
heavy
rains. 










1,700,000
 10
Mana3 PR Water Rehabilita3on
and
subs3tu3on
of
aging
storm
water
sewer
system
in
PR
6042
and
685. 










7,000,000
 60
Mana3 PR Water Rehabilita3on
and
subs3tu3on
of
aging
storm
water
sewer
system
in
Mana3
urban
core. 








11,000,000
 200
Mana3 PR Water Construc3on
of
sewer
system
in
Tierras
Nuevas
and
Poniente
wards
providing
services
to
3,000
households,

businesses
and
industrial
facili3es. 








20,000,000
 250
Mayaguez PR Airport New
firefigh3ng
equipment. 










1,000,000
 20
Mayaguez PR Airport Improvements
to
Airport
access
road. 










1,500,000
 50
Mayaguez PR Airport Construc3on
of
new
Emergency
and
Fire
figh3ng
facili3es
building 










3,000,000
 100
Mayaguez PR Airport Runway
extension
and
other
improvements.

Current
runway
is
5,000
feet
long,
8,000
feet
are
required
along

with
other
improvements
to
runway. 










5,000,000
 100
Mayaguez PR CDBG Dredging
of
the
channel
of
the
Port
facili3es
in
order
to
bring
the
depth
from
thrity
one
(31)
to
thirty
five
(35)

feet,
thus
allowing
larger
vessels
to
visit
our
port.

If
possible,
to
improve
some
of
the
exis3ng
port
favili3es. 








10,000,000
 100
Mayaguez PR CDBG Parking
facili3es
near
the
center
of
town. 










5,000,000
 100
Mayaguez PR CDBG Low
income
mul3‐family
housing
projects
near
the
center
of
town.

Several
small
projects
are
planned
for

rundown
loca3ons
around
that
area. 








10,000,000
 150
Mayaguez PR CDBG Addi3onal
recrea3onal
and
administra3ve
facili3es
for
the
support
of
the
XXI
Central
American
and
Caribbean

Games
to
be
held
in
Mayaguez
on
July
2010 








25,000,000
 200
Mayaguez PR CDBG Construc3on
of
facilil3es
for
the
elderly
combined
with
commercial
area
and
moderate
income
housing
in
a

downtown
area
under
renova3on. 








25,000,000
 200
Mayaguez PR CDBG Miscellaneous
downtown
urban
renewal
projects.

Renova3on
of
old
structures
to
meet
current
demand
for

commercial
as
well
as
moderate
income
housing. 








10,000,000
 200
Mayaguez PR CDBG Reloca3on
of
aerial
electric
and
other
u3li3es
lines
to
underground
in
downtown
area. 








20,000,000
 200
Mayaguez PR Energy Conversion
of
Municipal
Offices
from
fluorescent
lamps
to
LED's. 












150,000
 10
Mayaguez PR Energy Conversion
of
public
parks
and
other
public
facili3es
to
solar/LED
ligh3ng. 










5,000,000
 20
Mayaguez PR Energy Methane
collec3on
system
for
landfill. 










2,000,000
 20
Mayaguez PR Energy Construc3on
of
the
second
phase
of
a
bicycle
path
along
the
Yaguez
River.

The
first
phase
was
build
a
few

years
ago,
and
this
second
phase
will
connect
the
center
of
town
with
the
Mayaguez
Bay
and
other
passive

recrea3onal
facili3es
under
construc3on 










8,000,000
 100
Mayaguez PR Streets/Roads New
connector
between
Ramon
Emeterio
Betances
Street
and
Hiram
Cabassa
Street.

This
connector
will

alleviate
traffic
along
the
area. 










5,000,000
 100
Mayaguez PR Streets/Roads Construc3on
of
a
connector
between
PR‐2
and
PR‐102,
along
Carolina
Street.

This
will
provide
much
needed

access
to
over
2,000
ci3zens
living
along
PR‐102,
and
an
escape
route
in
case
of
a
tsunami. 








10,000,000
 150
Mayaguez PR Streets/Roads Extension
of
the
Eudaldo
Baez
Garcia
Boulevard.

First
phase
was
completed
a
number
of
years
ago,
and
will

serve
to
feed
traffic
into
the
center
of
town
from
the
South. 








12,000,000
 150
Mayaguez PR Streets/Roads Widening
of
Nenadich
Street.

This
is
one
of
the
City's
main
arteries,
which
currently
has
only
two
lanes. 










8,000,000
 150
Mayaguez PR Streets/Roads Construc3on
of
an
overpass
over
the
intersec3on
between
PR‐2
and
Corazones
Avenue.

This
is
one
of
the

busiest
intersec3ons
along
PR‐2. 








25,000,000
 200
Mayaguez PR Streets/Roads Construc3on
of
an
overpass
over
the
intersec3on
of
Duscombe
Ave.
and
PR‐2.

Another
busy
intersec3on
along

PR‐2. 








13,000,000
 200
Mayaguez PR Streets/Roads Construc3on
of
an
overpass
over
the
intersec3on
that
provides
the
primary
access
to
the
Mayaguez
Campus
of

the
University
of
Puerto
Rico
along
PR‐2.

Current
daily
average
traffic
along
this
intersec3on
approaches

90,000
vehicles.

Current
facili3es
w 








25,000,000
 200
Mayaguez PR Streets/Roads Construc3on
of
an
overpass
over
the
three
intersec3ons
providing
access
to
the
Mayaguez
Mall
along
PR‐2.


This
is
one
of
the
main
projects
to
convert
PR‐2
to
an
expressway.

PR‐2
is
the
major
artery
that
crosses
the
city

of
Mayaguez
from
North
to
South. 








52,000,000
 300
Mayaguez PR Transit Acquisi3on
of
four
(4)
:vintage
trolley"
type
buses
for
two
routes
around
the
center
of
town. 












700,000
 10
Mayaguez PR Transit Acquisi3on
of
twenty
(20)
buses
for
Municipal
Public
Transporta3on
System
that
will
transport
ci3zens
from

outlying
areas
to
the
center
of
the
town.

Six
(6)
different
routes
are
being
contemplated. 










8,000,000
 150
City State Program Project
Descrip3on Funding
Required Jobs
Mayaguez PR Transit Modify
downtown
streets
to
accommodate
large
capacity
buses
for
an
inter‐city
mass
transit
system. 








40,000,000
 300
Mayaguez PR Water Construc3on
of
ten
(10)
pumping
sta3ons
to
support
the
water
tanks. 












100,000
 25
Mayaguez PR Water Construc3on
of
ten
(10)
fresh
water
tanks.

Nearly
seventy
percent
of
the
municipality
is
on
high
ground,

where
fresh
water
services
is
deficient.

These
tanks
will
be
located
at
selected
sites
around
the
municipality
in

order
to
ensure
a
con3nuous
fres 










5,000,000
 100
Mayaguez PR Water Improvements
to
sewers
systems
in
the
Rio
Hondo,
Miradero,
La
Salud
and
Buena
Vista
Wards. 










8,000,000
 100
Moca PR CDBG Construc3on
of
hotel
and
villas
to
expand
room
offer
in
the
area
providing
facili3es
to
businessmen
and
tourist

who
visit
the
area. 








10,000,000
 80
Moca PR CDBG Construc3on
of
an
office/commercial
building
to
provide
rented
office
space
to
state
government
service
office

and
commercial
space
to
local
business.
Project
will
be
located
in
the
old
town. 










5,000,000
 100
Moca PR CDBG Crea3on
of
a
revolving
fund
to
provide
financing
to
small
business
and
low
income
housing
devolopment. 








10,000,000
 100
Moca PR Housing Construc3on
of
260
rental
housing
units
in
the
City's
urban
area
bringing
new
families
to
live
in
this
area.
This

housing
project
will
contribute
to
revitalize
the
area. 








10,000,000
 150
Moca PR Streets/Roads Expansion
to
4
lanes
of
Puerto

Rico
PR
111
to
connect
Moca
with
PR
2
reducing
travel‐3me
within
the

Aguadilla‐Aguada‐Moca‐San
Sebas3an
MSA. 










6,000,000
 200
Moca PR Water Rehabilita3on
and
expansion
of
water
infrastructure
for
the
communi3es
along
PR
111
serving
1070
families

and
100
small
business. 










1,600,000
 150
Naranjito PR CDBG
Naranjito PR CDBG 
CONSTRUCTION
OF
BOARDWALK
AND

STAIRS
AT
LAS
LAGRIMAS
SECTOR
NARANJITO
PUERTO
RICO 












500,000
 25
Naranjito PR CDBG CONSTRUCTION
PASSIVE
AREA
AT
VICTOR
J
MOLINA
SECTOR
NARANJITO,P.R. 












800,000
 30
Naranjito PR CDBG COSTRUCTION
CHANNEL
CANALIZATION
NORTH
MUNICIPAL
ROAD
NARANJITO
PUERTO
RICO 












600,000
 35
Naranjito PR CDBG CHANNEL
CANALIZATION
PHASE
V
AT
RIO
GUADIANA

NARANJITO
PUERTO
RICO 










1,800,000
 40
Naranjito PR CDBG CONSTRUCTION
OF
SIDEWALKS,CURB
AND
GUTTERS
AT
GEORGETTI
STREET
NARANJITO
PUERTO
RICO 










1,800,000
 75
Naranjito PR CDBG CONSTRUCTION
OF
OFFICES
URBAN
ZONE
NARANJITO
PUERTO
RICO 










3,500,000
 100
Naranjito PR CDBG CONSTRUCTION
OF
CITY
HALL
AND
MULTY
STORY
PARKING
AT
URBAN
ZONE
NARANJITO
PUERTO
RICO 








10,000,000
 150
Pa3llas PR CDBG Rehabilita3on
of
the
old
movie
which
will
be
turned
into
a
new
performing
arts
complex. 












800,000
 20
Pa3llas PR CDBG Channeliza3on
of
Mamey
Creek
which
splits
in
two
the
urban
area
elimina3ng
poten3al
hazard.
Recent
rains

flooded
urban
area
damaging
homes
and
commerce.
A
disaster
declara3on
due
to
this
event
was
issued
by
the

President
of
the
United
States 












500,000
 25
Pa3llas PR CDBG Construc3on
of
a
boardwalk
and
small
business
rental
space
in
Lake
Pa3llas
to
bring
tourist
ac3vity
to
the
area.













600,000
 25
Pa3llas PR CDBG Conversion
of
the
City
gym
into
a
conven3on
center
to
house
small
business
and
professional
ac3vi3es. 










1,500,000
 50
Pa3llas PR CDBG Construc3on
of
sport
arena
to
house
sport
events,
business
and
commercial
exhibits,
and
other
art
events. 










1,500,000
 75
Pa3llas PR CDBG Expansion
and
rehabilita3on
of
the
power
distribu3on
system
increasing
its
capacity
to
serve
new
business
and

housing
projects
in
the
center
of
the
urban
area. 










2,570,000
 80
Pa3llas PR CDBG Construc3on
of
parking
building
for
450
vehicles.
Project
will
facilitate
access
to
poten3al
clients
to
exis3ng

and
future
small
businesses
in
downtown. 












500,000
 100
Pa3llas PR CDBG Expansion
and
rehabilita3on
of
the
ter3ary
and
secondary
road
system
serving
15,000
residents.
Project
will

solve
transporta3on
delays
reducing
fuel
expenditure. 










1,000,000
 100
Pa3llas PR CDBG New
construc3on
of
the
City's
downtown
plaza
serving
visitors
to
ins3tu3onal
offices,
local
commerce,

downtown
residents. 










1,200,000
 112
Pa3llas PR CDBG Construc3on
of
an
ins3tu3onal/commercial
building
to
house
rented
governmental
offices
and
new

commercial
space
in
the
urban
center
of
the
City.
Commercial
area
will
allow
establishment
and
opera3on
new

small
businesses
crea3ng
new
jobs
opportuni3es 










6,000,000
 150
Pa3llas PR Water Construc3on
of
wastewater
sewage
system
to
serve
100
households
in
Bajos
ward.
Project
will
also
serve
the

fishermen
and
beach
facili3es. 










1,425,000
 50
Ponce PR Airport Improvements
to
Mercedita
Airport
to
add
4
new
gates 








17,250,000
 180
Ponce PR Airport Improvements
to
Mercedita
Airport
to
add
new
cargo
facili3es 








30,000,000
 313
Ponce PR Airport Extension
of
Mercedita
Airport
Runway
by
an
approximate
length
of
4000
b. 








51,022,222
 531
Ponce PR CDBG Acquisi3on
of
two
proper3es
and
road
improvements
in
McManus
St.
to
connect
to
Villa
St. 










1,145,000
 12
Ponce PR CDBG Reloca3on
of
the
Calzada
Community
to
the
Southern
Parcels
of
new
PR‐1
reloca3on. 










1,125,000
 12
Ponce PR CDBG Acquisi3on
and
Environmental
Cleanup
of
Parcels
in
Clausell
Ward 












960,000
 40
Ponce PR CDBG Improvements
to
Hostos
Street
from
Tourist
Terminal
to
PR‐163
with
an
approximate
length
of
1,950
meters. 










4,875,000
 51
Ponce PR CDBG Improvements
to
J.
E.
Monagas
Passive
Park
and
addi3on
of
water
recrea3onal
ac3vi3es
and
linear
park
to

Caribbean
Sea. 










5,000,000
 52
Ponce PR CDBG Acquisi3on
and
construc3on
of
Staging
and
Parking
terminal
fro
ruise
Ships,
with
an
approximate
area
of
9,100

square
meters 










5,736,058
 60
Ponce PR CDBG Construc3on
of
96
housing
units
in
Clausell
Ward 










6,720,000
 70
Ponce PR CDBG Rehabilita3on
of
the
Hacienda
Buena
Vista
facili3es 










8,000,000
 83
Ponce PR CDBG Caja
de
Muertos
Ecological
Hotel
with
60
cabins. 










9,000,000
 94
Ponce PR CDBG Improvements
to
Tibes
Ceremonial
Park
and
Museum. 








10,000,000
 104
Ponce PR CDBG Construc3on
of
Housing
units
in
Victoria
St. 








11,000,000
 115
Ponce PR CDBG Acquisi3on
and
Rehabilita3on
of
Old
Market
Plaza
for
new
housing
units 








14,000,000
 146
Ponce PR CDBG Rehabilita3on
of
historic
buildings
at
Playa
Ward
in
Bonaire
St.
to
Padre
Noel
St.,
and
from
San
Alfonso
XII
St.
to

Puerto
Viejo
St. 








16,000,000
 167
Ponce PR CDBG Rehabilita3on
of
the
former
Ponce
Intercon3nental
Hotel
at
El
Vigia
Ward. 








16,250,000
 169
Ponce PR CDBG Construc3on
of
the
Music
Museum
of
Ponce 










1,750,000
 182
Ponce PR CDBG Regional
Sports
complex 








23,600,000
 246
Ponce PR CDBG Construc3on
of
the
new
Calzada
Community 








27,500,000
 286
Ponce PR CDBG Technological
School
for
the
Southern
Region
of
Puerto
Rico 








30,000,000
 313
Ponce PR CDBG Construc3on
of
new
tourist
wharf
at
Hostos
St.
with
a
total
length
of
1,200
feet
long
by
160
feet
wide,
to
berth

two
mega
cruise
ships
simultaneously 








57,600,000
 600
Ponce PR Energy Methane
Gas
Recovery
for
Alterna3ve
Use
at
Ponce
Landfill 








10,000,000
 104
Ponce PR Public
Safety Closed
Circuit
Cameras
and
Control
Center
for
the
Municipality. 










1,500,000
 16
City State Program Project
Descrip3on Funding
Required Jobs
Ponce PR Public
Safety Community
Police
Sta3ons
for
Municipal
Police
at
Tuque
and
Cofo
Laurel
Ward 










2,500,000
 26
Ponce PR Public
Safety Development
of
Tourist
Parcels
in
Esperanza
Ward 








24,000,000
 250
Ponce PR Public
Safety Headquarters
for
the
Municipal
Police
of
Ponce. 








25,000,000
 260
Ponce PR Streets/Roads Sidewalks,
curbs,
and
pavement
imrpovements
in
Nueva
Vida
Wards 










2,960,000
 31
Ponce PR Streets/Roads Reloca3on
of
PR‐1
from
PR‐52
to
PR‐507,
with
an
approximate
length
of
2,500
meters 










3,125,000
 33
Ponce PR Streets/Roads Improvements
to
PR‐52
exit
to
PR
‐506
at
Cofo
Laurel
Ward
with
an
approximate
length
of
500
meters. 










3,500,000
 36
Ponce PR Streets/Roads Improvements
to
PR‐10
from
PR‐52
to
PR‐1
with
an
approximate
length
of
2,000
meters 










5,000,000
 52
Ponce PR Streets/Roads Improvements
to
PR‐2
from
PR‐2R
to
PR‐1
to
eliminate
marginal
streets
and
provide
a
central
turning
lane,

with
an
approximate
length
of
4,600
meters 










5,750,000
 60
Ponce PR Streets/Roads Improvements
to
PR‐14
Bridge
and
approach
roadway
over
Bucana
River
up
to
PR‐5139,
with
an
approximate

length
of
960
meters 










6,250,000
 65
Ponce PR Streets/Roads Construc3on
of
4
lane
access
road
to
El
Vigia
Ward
with
an
approximate
length
of
l,400
meters
to
provide

access
to
La
Cruzeta
del
Vigia,
Cas3llo
Serrales
and
the
former
Intercon3nental
Hotel 










6,500,000
 68
Ponce PR Streets/Roads Widening
of
PR‐14
from
PR‐506
to
PR‐5139
with
an
approximate
length
of
2,675
meters 










6,750,000
 70
Ponce PR Streets/Roads Acquisi3on
and
construc3on
of
new
access
road
to
Historic
center
of
Ponce,
with
an
approximate
length
of

3,200
meters. 










8,000,000
 83
Ponce PR Streets/Roads Sidewalks,
curbs,
and
pavement
improvements
in
El
Tuque
Ward. 








11,500,000
 120
Ponce PR Streets/Roads Improvements
to
PR‐123
from
PR‐2
to
Hacienda
Buena
Vista
for
an
approximate
length
of
10,000
meters. 








12,500,000
 130
Ponce PR Streets/Roads Reversible
Lane
and
widening
of
PR‐52
from
Juana
Diaz
Toll
Sta3on
to
Ponce
Toll
Plaza
with
an
approximate

length
of
14,500
meters 








14,500,000
 151
Ponce PR Streets/Roads Construc3on
of
connector
from
PR‐9
to
Baramaya
Ave
and
improvements
to
Baramaya
Ave
up
to
PR‐52,
with

an
approximate
length
of
4,600
meters 








17,500,000
 182
Ponce PR Streets/Roads Improvements
to
PR‐506
from
PR‐52
to
PR‐14
with
an
approximate
length
of
l,700
meters 








18,500,000
 193
Ponce PR Streets/Roads Construc3on
of
new
4
lane
divided
highway
from
PR‐385
to
Baramaya
Ave
and
Las
Americas
Ave.
with
an

approximate
length
of
8,800
meters 








22,000,000
 229
Ponce PR Streets/Roads Improvements
to
PR‐10
from
PR‐143
to
PR‐14
consis3ng
of
an
addi3onal
lane
and
median
construc3on
for
an

approximate
length
of
19,500
meters 








24,375,000
 254
Ponce PR Transit Alterna3ve
Analysis
Studies
for
the
Ponce
transit
System 










5,000,000
 52
Ponce PR Water Improvements
to
SDEAP‐PUCPR
drinking
water
distribu3on
system 










3,300,000
 15
Ponce PR Water Sanitary
System
for
the
Eastern
Sector
of
Ponce,
for
Nueva
Vida
Wards. 










1,480,000
 15
Ponce PR Water Sanitary
system
for
the
Eastern
Sector
of
Ponce,
for
El
Tuque
Wards. 










5,750,000
 60
Salinas PR CDBG Construc3on
and
rehabilita3on
of
roads,
streets,
sidewalks
and
streets
intersec3on
in
PR
701.
Construc3on
and

rehab
of
water
and
wastewater
sewer
system.
Rehabilita3on
of
power
and
communica3ons
systems.

Installa3on
of
photvoltaic
luminaries.
Proje 










6,700,000
 100
Salinas PR CDBG Construc3on
of
a
124
units
housing
for
the
elderly
project.
Project
will
be
developed
in
City
land
located
in
the

urban
area
across
the
City
Hall.
It
will
serve
a
popula3on
ranging
from
124
to
248
individuals.
Bringing
new

residents
to
downtown
district 








12,000,000
 100
Salinas PR CDBG Construc3on
of
2
new
community
service
centers
facili3es
to
assist
a
total
popula3on
of
31,900
residents. 










2,000,000
 150
Salinas PR CDBG Rehabilita3on
of
housing
structures
and
infrastructures
in
the
Aguirre
historic
zone
district.
Construc3on
of

facili3es
to
develop
fishing
industry.
Buildings
rehab
will
provide
commercial
space
crea3ng
new
jobs
for
the

area.
This
community
encompasse 








20,000,000
 150
Salinas PR CDBG Rehabilita3on
of
school
building
and
construc3on
of
new
structures
to
develop
a
fine
arts
special
public
school.

Project
will
serve
local
k‐12
popula3on. 










7,000,000
 175
Salinas PR CDBG Crea3on
of
a
revolving
fund
to
finance
small
businesses,
construc3on
of
low
income
housing
projects
(housing

units
for
sale),
and
rehabilita3on
of
housing
and
commercial
structures. 








15,000,000
 200
Salinas PR Energy Develop
a
wind
turbine
field
to
provide
energy
to
underserved
low
income
community.
Project
will
benefit

underserved
300
households.
 








15,000,000
 100
Salinas PR Energy Development
of
a
methane
power
genera3on
in
local
landfill.
The
City
would
enter
in
a
joint
venture
with

private
firm
opera3ng
the
landfill
to
develop
the
methane
plant. 








20,000,000
 100
Salinas PR Energy Installa3on
of
solar
panels
for
the
produc3on
of
electricity
in
the
City's
public
buildings,
and
moderniza3on
of

the
energy
distribu3on
system
in
the
urban
area. 










7,000,000
 100
Salinas PR Energy Installa3on
of
solar
powered
luminaries
in
the
urban
area
and
4
rural
communi3es
serving
5,700
households

and
businesses. 








15,000,000
 150
Salinas PR Public
Safety Installa3on
of
computer
and
communica3on
systems
in
local
police
vehicles
and
headquarters
in
order
to
hook

local
police
with
state
and
Federal
safety
agencies.
Acquisiton
of
new
vehicles
and
installa3on
of
video
systems

to
expand
service
area.
Recruit 










6,000,000
 100
Salinas PR Water Construc3on
of
water
and
wastewater
infrastructure
to
control
overflow
and
flooding
in
2
rural
communi3es

providing
services
for
1,500
households
and
175
small
businesses.
Channeliza3on
of
creeks
which
flow
within

the
communi3es. 








22,000,000
 150
Salinas PR Water Flood
control
project
in
Rio
Nigua
to
eliminate
recurrent
flooding
ocurring
due
to
hurricane
and
tropical

systems
heavy
rains.
For
the
past
20
years
5
hurricane
and
tropical
systems
have
affected
the
jurisdic3on

producing
more
than
$150,000,000
in
econom 








20,000,000
 200
San
Juan PR CDBG Construc3on
of
four
(4)
new
Head
Start
facili3es. 










6,000,000
 20
San
Juan PR CDBG Development
of
an
Equestrian
Park 










8,000,000
 20
San
Juan PR CDBG Development
of
Veterans'
House 








10,000,000
 20
San
Juan PR CDBG Improvement
to
the
Roberto
Clemente
Coliseum 










8,000,000
 20
San
Juan PR CDBG Ar3san
Marketplace 












400,000
 30
San
Juan PR CDBG Channeliza3on
of
river
and
creeks 








18,000,000
 30
San
Juan PR CDBG Improvements
to
city
parks
and
recrea3onal
facili3es 








10,000,000
 50
San
Juan PR CDBG Fishing
village
(La
Pun3lla) 










5,000,000
 80
San
Juan PR CDBG San
Juan
Municipal
Cemetery
Facili3es 








25,000,000
 115
San
Juan PR CDBG Rio
Piedras
Lineal
Park 








12,000,000
 120
San
Juan PR CDBG Construc3on
of
a
New
Central
market
at
Bechara
Industrial
Park
for
local
and
interna3onal
distribu3on
of

agricultural
products
(San
Juan
Brand) 








14,000,000
 200
San
Juan PR CDBG Construc3on
of
five
(5)
Health
Centers
specialized
in
Urology,
Cancer
Treatment,
Leukemia,
HIV
Treatment,

Alzheimer. 








10,000,000
 250
City State Program Project
Descrip3on Funding
Required Jobs
San
Juan PR CDBG Improvements
to
Sport
Center
and
Parking
Facili3es 






180,000,000
 300
San
Juan PR CDBG Landfill
redevelopment 








28,000,000
 300
San
Juan PR CDBG Development
of
the
Mar3n
Peña
Channel,
including
demoli3on
and
reloca3on. 








75,000,000
 1500
San
Juan PR Energy Development
of
a
compressed
Gas
Plant 










4,000,000
 35
San
Juan PR Energy Installa3on
of
solar
panels
and
energy
systems
on
four
(4)
public
facili3es 










4,000,000
 50
San
Juan PR Energy Provide
grants
to
homeowners
to
perform
energy
efficiency
retrofits 










4,000,000
 100
San
Juan PR Energy Development
of
a
Waste‐to‐Energy
Plan 






250,000,000
 300
San
Juan PR Housing Development
of
Public
Housing
for
the
Elderly 








20,000,000
 40
San
Juan PR Public
Safety Acquisi3on
of
equipment
for
the
Marine
Unit
of
the
Municipal
Police. 










2,000,000
 12
San
Juan PR Public
Safety Acquisi3on
of
equipment
and
computers
to
support
crime
inves3ga3on 










2,500,000
 50
San
Juan PR Public
Safety Establishing
a
Municipal
Fire
Department 








10,000,000
 100
San
Juan PR Schools Development
of
an
Au3sm
School 










5,000,000
 10
San
Juan PR Schools Development
of
sports
facili3es
at
the
San
Juan
School
of
Athle3cs 










5,000,000
 50
San
Juan PR Streets/Roads Access
to
Bechara
Industrial
Park 








10,000,000
 95
San
Juan PR Streets/Roads Improvement
to
historic
Old
San
Juan
streets
and
sidewalks 








48,000,000
 225
San
Juan PR Streets/Roads Improvements
to
Roosevelt
and
DeDiego
Avenues 








25,000,000
 230
San
Juan PR Streets/Roads Construc3on
and
reconstruc3on
of
rural
roads
and
bridges;
asphalt
roads,
sidewalks
and
municipal
streets
and

urban
streets
and
avenues. 






110,000,000
 850
San
Juan PR Transit Comple3on
of
the
urban
light
train
system
from
Hato
Rey
to
Old
San
Juan 






250,000,000
 1500
San
Juan PR Water Rehabilita3on
of
city‐wide
sewer
and
sanitary
system 








20,000,000
 100
Utuado PR CDBG Construc3on
of
a
15
rooms
hotel
development
within
the
old
town
district. 










5,000,000
 25
Utuado PR CDBG Construc3on
of
wastewater
sewage
system
to
serv
1060
households,
the
University
of
Puerto
Rico
Utuado

Precinct,
and
public
high
school
Inocencio
Montero. 










3,500,000
 50
Utuado PR CDBG Construc3on
of
new
sport
arena
to
house
sports
events,
conven3ons
and
art
events. 








15,000,000
 95
Utuado PR CDBG Construc3on
of
a
building
complex
within
the
old
town's
district
to
provide
rented
facili3es
to
the
University

del
Este. 








15,000,000
 175
Utuado PR Housing Construc3on
of
a
60
units
rental
housing
development
to
bring
new
families
to
live
within
the
old
urban

district. 










8,000,000
 150
Yauco PR CDBG Design
and
Construc3on
of
Yauco
Mul3purpose
Community
and
Entertainment
Center.
The
project
consists
of

an
area
of
61,
275SF
to
accommodate
3,500
persons.
 










3,000,000
 30
Yauco PR CDBG The
Municipality
of
Yauco
is
proposing
the
reconstruc3on
and
restora3on
of
building
complex
“Casa
Llinas”.

The
proposed
project
include
the
rehabilita3on
of
exis3ng
areas
to
be
converted
into
an:
bed
and
breakfast

(hostal),
electronic
library,

museum 










3,000,000
 30
Yauco PR CDBG Rebuilt
Historic
Building
“Teatro
Ideal”.
Area
10,010sf
(basement,
ground
floor,
&
mezzanine
level),
419
seats
at

Yauco
Downtown
area.




 










2,500,000
 40
Yauco PR CDBG Construc3on
of
Yauco
Urban
Park,
located
on
a
municipal
parcel.
The
total
area
for
the
park
is
composed
of
2

parcels
divided
by
PR‐368,
with
approximately
24
acres
to
include;
pedestrian
track
&
field,
pond,
acous3c

open
air
stage,
landscaping,
playgrou 










3,000,000
 50
Yauco PR CDBG Design
&
Construc3on
of
an
extension
of
City
Hall
Administra3ve
Building 










5,000,000
 75
Yauco PR Energy Conver3on
of
Gasoline
and
Diesel
Municipal

Vehicles
to
Propane
Gas

Energy
save
system.

 












500,000
 8
Yauco PR Energy Conver3on
of
Municipal
Offices
from
flurecent
lamps
to
LED's 












150,000
 10
Yauco PR Energy Conver3on
of
public
parks
and
others
facili3es
to
solar/LED
ligh3ng 










2,000,000
 20
Yauco PR Housing Construc3on
of
20
housing
units
at
Bda.
Galarza's
Sector
at
Pueblo
Norte's
Ward,
Nueva
Vida's
Sector
at

Palomas
Ward,
El
Pozo
Sector
at
Pueblo
Norte's
Ward,
Santo
Domingo's
Sector
at
Pueblo's
Sur
Ward.


 










1,000,000
 15
Yauco PR Public
Safety Acquisi3on
of
3
police
cars
to
support
law
enforcement
personnel.
 












150,000
 6
Yauco PR Public
Safety Closed
circut
camaras
and
Control
center
for
the
Municipality. 










1,500,000
 18
Yauco PR Public
Safety Construc3on
and
removal
of
the
urban
center
at
the
downtown
area
to
implement
economic
development

ini3a3ves.
 










8,000,000
 100
Yauco PR Streets/Roads Replacement
of
exis3ng
bridge
over
Yauco
River,
State
Road
PR‐3335,
at
Barinas
Community,
Yauco.
Length:
30

meters
span,
width
23.5b. 












500,000
 25
Yauco PR Transit Construc3on
of
Public
Transit
Terminal.
Area
of
19,824sf,
2
story
public
cars
terminal
building
with
accesory

facili3es:
administra3ve
ofices,
retail
areas,
and
bathrooms.



 












500,000
 10
Yauco PR Transit Pavement
of
4,
326,.92
meters
at
Algarrobos
Ward,
Diego
Hernandez
Ward,
Frailes
Ward,
and
Quebradas
Ward













400,000
 20
Yauco PR Water Construc3on
and
Improvements
of
Storm
Water
Systems
of
Downtown
of
Downtown
Area 










2,000,000
 40
Pawtucket RI CDBG Friendship
Garden
Restora3on:
this
project
would
restore
the
garden
in
the
City
‘s
largest
park
The
walls
in

certain
areas
of
the
garden
have
collapsed
and
need
to
be
rebuilt.
The
project
would
also
remove
the
invasive

species
that
have
overgrown
the
wat 












250,000
 25
Pawtucket RI CDBG Jenks
Junior
High
School
Court
Replacement.
This
1975
built
school
complex
has
two
basketball
courts
and
two

tennis
courts.
These
30
year
old
courts
are
in
desperate
need
of
replacement.
This
project
would
construct
two

new
tennis
courts,
a
new
basketball
court 












500,000
 25
Pawtucket RI CDBG Track
and
Field
Turf
Field
‐

Max
Read
Field

is
a
combina3on
Football/Soccer
Field
and
a
Track.
The
facility
(the

track
especially)
need
to
be
enlarged
to
meet
the
current
RI
interscholos3c
standards.
The
work
will
involve
the

complete
reconstruc3on 










2,000,000
 40
Pawtucket RI CDBG Town
Landing
Park
Development:
This
project
will
provide
new
public
access
and
docking
facili3es
along
the

City’s
waterfront
to
promote
recrea3onal
and
tourist
use
of
the
City’s
waterfront.













1,200,000
 50
Pawtucket RI Streets/Roads Storm
Water
Reten3on
:
a).
Armis3ce
Boulevard
b).
Columbus
Avenue
This
project
will
provide
for
the

installa3on
of
two
storm
water
reten3on
facility
to
prevent
flooding
in
two
roadways
in
the
City.Both
ares
that

flood
in
every
major
storm
event
a 












150,000
 25
Pawtucket RI Streets/Roads Storm
Water
Rrten3on
Project
a)
Armis3ce
Boulvard
b)
Columbus
Avenue.
These
two
main
raod
each
have
an

area
the
constantly
floods
in
heavy
rain
storms.
Both
of
the
ares
floded
are
on
the
route
to
the
only
hospital
in

the
City.
this
flodding
delays
respo 












150,000
 25
City State Program Project
Descrip3on Funding
Required Jobs
Pawtucket RI Streets/Roads Cole
Street
Bridge
Replacement.
The
closed
bridge
over
the
AMTRAK
main
line
has
been
designed
and
is
being

permifed.
The
replacement
of
this
bridge
will
provide
another
connec3on
between
Pawtucket
and
the

neighboring
City
of
Afleboro
MA. 












500,000
 40
Pawtucket RI Streets/Roads Gateway
Roadway
Improvement
Projects:
a)
Mineral
Spring
Avenue
b)Columbus
Avenue
c)
Cofage
Street
d)

Beverage
Hill
Avenue.
This
project
will
repave
all
of
these
main
aterials
in
the
City
providing
not
only
new

roadway
surfacing
but
reseqng
curbing,
rep 












500,000
 60
Pawtucket RI Water Coats
and
Clark
Infrastructure
improvements.
This
2
million
square
foot
Na3onal
Registor
Mill
complex
is
over

50%
vacant.
A
developer
has
acquired
1
million
square
feet
and
is
ready
to
start
rehabing
the
buildings
.
The

water
and
sewer
lines
however
have 












750,000
 45
Providence RI Amtrak Parking
Facility
Renova3on 










2,000,000
 80
Providence RI Amtrak Rehabilita3on
of
Train
Sta3on 








20,000,000
 200
Providence RI CDBG Economic
Development
Interim
Capital
for
Small
Employers
seeking
revolving
credit 










5,000,000

Providence RI CDBG Incubator
fund
–
technology
and
knowledge
based
businesses 










5,000,000

Providence RI CDBG Providence
Economic
development
–
recapitalize
sec3on
108
loan
program
–
for
small
businesses
and
large

projects 










7,500,000

Providence RI CDBG Esek
Hopkins
Homestead
Improvements 












650,000
 26
Providence RI CDBG Dredging
the
Woonasquatucket
and
Providence
Rivers 










2,500,000
 75
Providence RI CDBG Soccer
Field
Improvements 










2,000,000
 80
Providence RI CDBG Roger
Williams
Park
Zoo
‐
Polar
Bear
Exhibit 










4,800,000
 192
Providence RI CDBG Community
centers
–
major
renova3on
work 










8,500,000
 200
Providence RI CDBG Housing
improvements
‐
Olneyville,
Trinity
Gateway
and
Housing
projects 










7,000,000
 200
Providence RI CDBG Recrea3on
center
renova3ons 










5,000,000
 200
Providence RI CDBG Rehab
to
city
fire
sta3ons
and
construc3on
of
new
fire
training
facility 








20,000,000
 200
Providence RI CDBG Non‐Profit
Facili3es
Renova3ons
and
Addi3onal
Funding 










8,000,000
 300
Providence RI CDBG Trinity
Academy
Prep
School
‐
rehabilita3on
of
community
center
and
theater
into
charter
school 








10,000,000
 300
Providence RI CDBG Public
Works
Projects
(Manton
Avenue,
Westminster/Broadway,
Streets
and
Sidewalks
to
support
housing

developments,
projects
in
low/mod
areas) 










8,000,000
 400
Providence RI CDBG Center
for
the
Study
and
Prac3ce
of
Non‐Violence
Headquarters
and
Youth
Center 










2,500,000
 440
Providence RI Energy 60,000
Single
stream
recycling
collec3on
containers 










3,000,000
 0
Providence RI Energy Sidewalk
Tree
Plan3ng
‐
1600
Trees 












700,000
 10
Providence RI Energy Fire
Dept.
‐
Replacement
of
Hea3ng
Systems 












500,000
 15
Providence RI Energy Fire
Dept.
‐
Energy
Saving
windows 












500,000
 20
Providence RI Energy Botanical
Center
Educa3on
Center 










1,200,000
 48
Providence RI Energy City
Hall
Energy
Retrofiqng
and
Repairs 










5,000,000
 50
Providence RI Energy Roger
Williams
Park
Buildings
Retrofiqng
and
Renova3ons 










2,300,000
 92
Providence RI Energy 3
1500kW
Wind
Turbines
at
Fields
Point 








12,700,000
 100
Providence RI Energy Installing
solar‐thermal
for
City
buildings 










5,000,000
 100
Providence RI Energy Energy
Conserva3on,
renewable
resources,
retro‐fiqng
public
facili3es 










5,000,000
 200
Providence RI Energy Public
Works
Opera3on
and
Transfer
Sta3on 








30,000,000
 250
Providence RI Housing Improving
internal
fire
alarm
systems 










1,000,000

Providence RI Housing Gymnasium
at
Harzord
Park
‐
Providence
Housing
Authority 










2,000,000
 105
Providence RI Housing Renova3ons
at
14
sites
including
HVAC,
roofing,
sidewalks,
ligh3ng,
re‐piping,
new
bathrooms
and
kitchens
and

other
infrastructure
and
technology
improvements 








22,000,000
 200
Providence RI Public
Safety Providence
Police
Department
as
a
“Teaching
Police
Department”
Ini3a3ve
–
intent
is
to
apply
the
teaching

hospital
model
to
advancing
policing
as
a
profession.


The
partnership
will
provide
a
unique
opportunity
to

learn
how
other
disciplines
evolved
 










5,000,000

Providence RI Public
Safety An3‐Gang
Unit
Expansion
ini3a3ve 












300,000
 0
Providence RI Public
Safety Citywide
Drug
Market
Interven3on
Ini3a3ve 












850,000
 0
Providence RI Public
Safety Gun
Task
Force
expansion
ini3a3ve 












600,000
 0
Providence RI Public
Safety Shotspofer
Gun
Blast
Detec3on
system 












425,000
 0
Providence RI Public
Safety Specialized
In‐service
training
‐
8
hours
on
such
topics
as
cyber
crimes,
technology,
etc 












158,080
 0
Providence RI Public
Safety Video
Conferencing
System
for
substa3on
communica3on
and
long
distance
learning 














95,000
 0
Providence RI Public
Safety Emergency
Opera3ons
Center
‐
Phase
II 










2,500,000
 20
Providence RI Schools George
J.
West
Elementary
Renova3on 








40,000,000
 137.5
Providence RI Schools Samuel
Bridgham
Middle
School
Renova3on 








30,000,000
 137.5
Providence RI Schools Mount
Pleasant
High
School
renova3on 








90,000,000
 185.5
Providence RI Schools Warm,
Safe,
and
Dry
School
Program 








40,000,000
 200
Providence RI Streets/Roads Replace
deck
on
Atwells
Ave
Bridge
over
Woonasquatucket
River 












750,000
 15
Providence RI Streets/Roads Replace
Tar
Bridge
carrying
Manton
Ave
over
Woonasquatucket
River 












750,000
 15
Providence RI Streets/Roads Roger
Williams
Park
bridge
repairs 












335,000
 15
Providence RI Streets/Roads Sidewalk
repairs
in
front
of
fire
sta3ons 












250,000
 25
Providence RI Streets/Roads Repaving
Bridgham
St.
from
Elmwood
Ave.
to
Westminster
St. 












700,000
 28
Providence RI Streets/Roads Repave
Thurbers
Ave.
from
Broad
Street
to
Allens
Ave. 












750,000
 30
Providence RI Streets/Roads ADA
Ramps
for
100‐150
intersec3ons 










1,000,000
 40
Providence RI Streets/Roads Repave
Branch
Ave.
from
N.
Main
to
Rt.
146 










1,000,000
 40
Providence RI Streets/Roads Repave
Manton
Ave.
from
Chalkstone
Ave.
to
Aleppo
St. 










1,000,000
 40
Providence RI Streets/Roads Repave
Valley
Street
from
Pleasant
Valley
Parkway
to
Harzord
Ave. 










1,000,000
 40
Providence RI Streets/Roads North
Burial
Ground
Road
Improvements 










1,100,000
 44
Providence RI Streets/Roads Reconfigura3on
of
Emmef
Square 










2,500,000
 45
Providence RI Streets/Roads Repave
Hope
Street
from
Blackstone
Blvd.
to
5th
Street
and
from
Lloyd
Ave.
to
Wickenden
St. 










1,250,000
 50
Providence RI Streets/Roads Paving
and
arterial
signals
on
Broadway 










1,800,000
 72
Providence RI Streets/Roads Hurricane
Barrier
renova3ons
via
Army
Corp 










2,500,000
 80
City State Program Project
Descrip3on Funding
Required Jobs
Providence RI Streets/Roads Roger
Williams
Park
Road 










3,125,000
 130
Providence RI Streets/Roads Westminster
Street
‐
sidewalks,
paving
and
street
ligh3ng 










4,000,000
 160
Providence RI Streets/Roads Sidewalk
repairs
‐
18
miles
replaced
(Could
be
$10M
per
year
for
next
10
years) 








10,000,000
 200
Providence RI Streets/Roads Reconstruc3on
of:
‐Smithfield
Ave.
from
Nashua
St.
to
I‐95
‐Atwells
Ave.
from
Broadway
to
area
east
of
Service
Rd.
‐Exchange
Terrace
from
Francis
St.
to
Exchange
St.
‐Hun3ngton
Exp.
from
Hun3ngton
Ave.
to
Magnon
St.
‐Union
Ave.
from
Messer
St.
to 










8,300,000
 352
Providence RI Transit Energy
Efficiency
upgrades
at
Providence
RIPTA
facili3es 










1,000,000
 10
Providence RI Transit ITS
Development
(including
Customer
Informa3on
Screens,
passenger
info
sobware,
transit
kiosks
for
3cket

sales,
bus
stop
database,
etc.) 










4,000,000
 15
Providence RI Transit Service
Expansion
on
Urban
Routes
(56,
20,
11,
99)
and
addi3onal
suburban
Park
n'
Ride
Lots 










3,000,000
 30
Providence RI Transit Capital
Improvements
to
Kennedy
Plaza/RIPTA
hubs
‐
bus
shelters,
renova3ons,
etc 










1,000,000
 40
Providence RI Transit Downtown
Circulator 










1,500,000
 150
Providence RI Transit 1000‐Space
structured
parking
facility
to
serve
Garrahy
Judicial
Complex
and
the
reloca3on
of
the
Brown

University
Medical
Educa3on
Center 








47,000,000
 206
Providence RI Transit Streetcar
System 








20,000,000
 400
Providence RI Water Reconstruc3on
of
wall
along
Scituate
Reservoir
dam,
Phase
2 












100,000
 4
Providence RI Water 20‐inch
Water
Main
Installa3on
in
Western
Cranston
sec3on 












225,000
 5
Providence RI Water Dean
Estates
Pump
Sta3on
Upgrades 










1,000,000
 5
Providence RI Water Meter
and
Junc3on
Chambers
Rehabilita3on 












500,000
 5
Providence RI Water Regula3ng
Reservoir
Dam
Rehabilita3on 










1,000,000
 5
Providence RI Water Main
replacement
program 










3,000,000
 10
Providence RI Water Scituate
Avenue
16‐inch
Water
Main
Extension 










1,000,000
 10
Providence RI Water Lead
service
replacement
program
to
replace
1800
services
per
year
per
EPA 








15,000,000
 40
Providence RI Water Sanitary
sewer
mapping
and
data
collec3on 










1,000,000
 40
Providence RI Water Roger
Williams
Park
Lade
Dredging 










1,100,000
 44
Providence RI Water Police
Firing
Range
reloca3on
from
reservoir 








10,000,000
 100
Providence RI Water Renova3on
of
the
treatment
plant
filters
and
filter
building 








12,000,000
 100
Warwick RI CDBG Handicapped
accessible
public
fishing
pier 












514,000
 12
Warwick RI Streets/Roads Mill
Creek
Bridge
Replacement,
Tidewater
Drive,
Warwick,
RI 










1,500,000
 20
Warwick RI Water Interconnec3ons
with
Neighboring

Water
Systems 










1,000,000
 8
Warwick RI Water Cleaning
and
relining
of
exis3ng
cast
iron
water
mains 








10,000,000
 20
Warwick RI Water Replacement/Upgrading
of
Exis3ng
Infrastructure 








20,000,000
 24
Warwick RI Water Governor
Francis
Phase
II
Sewer
Extension 










4,600,000
 32
Warwick RI Water Governor
Francis
Phase
III
Sewer
Extension 










4,400,000
 32
Warwick RI Water Bayside
IV/Longmeadow
Sewer
Extension 










3,600,000
 33
Warwick RI Water Northwest
Gorton
Pond
Sewer
Extension 










2,800,000
 33
Warwick RI Water Sandy
Lane/Cedar
Swamp
Sewer
Extension 










1,600,000
 33
Woonsocket RI CDBG Historic
renova3on
of
Hamlet
Guard
House
for
school
use 












800,000
 50
Woonsocket RI CDBG Flood
Control
System
Improvements
and
Upgrades 










3,000,000
 150
Woonsocket RI CDBG Cass
Park
Improvements 










4,450,000
 275
Woonsocket RI CDBG Street
Reconstruc3on 










5,000,000
 400
Woonsocket RI Energy City‐wide
Energy
Audit/Rehabilita3on:
Solar
Infrastructure 












600,000
 20
Woonsocket RI Energy Install
solar
panels
at
the
five
fire
sta3ons
for
hea3ng
purposes 










1,000,000
 20
Woonsocket RI Energy Install
energy
efficient
ligh3ng
and
windows
throughout
the
five
fire
sta3ons 










1,200,000
 45
Woonsocket RI Public
Safety Technology
and
Facility
Upgrades
at
the
Police
Department 










1,000,000
 20
Woonsocket RI Public
Safety Construc3on
of
a
new
Fire
Department
Headquarters,
including
a
City
Hall
annex
for
certain
cri3cal
municipal

services
(police,
telecommunica3ons,
administra3on)
 








30,000,000
 150
Woonsocket RI Schools Install
New
State‐of‐the‐Art
Educa3onal
Technology
Equipment
at
Two
New
Middle
Schools
 










1,400,000
 100
Woonsocket RI Schools Install
Solar
Panels
at
New
Middle
Schools 










1,500,000
 100
Woonsocket RI Streets/Roads Bridge
Rehabilita3on
(4) 










4,000,000
 80
Woonsocket RI Water Line
Rehabilita3ons
‐
Storm
Overflows 










1,000,000
 20
Woonsocket RI Water Syphon
Upgrades 












500,000
 20
Woonsocket RI Water Upgrade
wastewater
facility
as
per
State
mandate 








48,000,000
 100
Woonsocket RI Water Construc3on
of
new
10.5
million
gallon
drinking
water
facility
(federally‐mandated
project) 








35,000,000
 150
Charleston SC Airport Johns
Island
Airport
Apron
Expansion 










3,000,000
 45
Charleston SC Airport Airport
Technology
and
Infrastructure 










9,300,000
 140
Charleston SC Amtrak Northfold
Southern
Tracks
Upgrade
Between
Summerville
and
Charleston
for
Commuter
Rail
SVC 








25,230,000
 50
Charleston SC Amtrak Rail
Cars
Purchase
for
Commuter
Rail
SVC
from
Summerville
to
Charleston 








45,000,000
 75
Charleston SC Amtrak Construc3on
N.
Chas.
Intermodal
Center
for
Amtrak
Sta3on 










7,800,000
 250
Charleston SC CDBG Atructural
Repairs
Parking
Garage
09 












275,000
 5
Charleston SC CDBG Charleston
Mari3me
Center
Fire
Suppression
System
&
Guardrails 












275,000
 5
Charleston SC CDBG Police
Substa3on
at
the
Mafress
Factory 












495,000
 8
Charleston SC CDBG Install
(200)
Bus
Stop
Info
Kiosks 












100,000
 10
Charleston SC CDBG White
Point
Gardens
Banstand
Renova3on 












600,000
 11
Charleston SC CDBG Erosion
Control
of
Waterfront
(Two
Loca3ons) 










1,100,000
 20
Charleston SC CDBG Construc3on
of
(25)
Bus
Shelters
System
‐Wide 












625,000
 25
Charleston SC CDBG Memminger
Streetscape 










1,500,000
 26
City State Program Project
Descrip3on Funding
Required Jobs
Charleston SC CDBG Water
Taxi
Dock
and
Facility 










1,500,000
 26
Charleston SC CDBG James
Island
Recrea3on
Expansion 










1,500,000
 27
Charleston SC CDBG North
Bridge
Park 










1,500,000
 27
Charleston SC CDBG Non‐Profit
Incubator 










3,000,000
 28
Charleston SC CDBG Fire
Sta3on
#
9 










1,750,000
 31
Charleston SC CDBG White
Point
Gardens
Phase
II 










2,000,000
 34
Charleston SC CDBG Charlofe
Street
Park 










2,100,000
 35
Charleston SC CDBG Woodland
Road
Park 










2,000,000
 35
Charleston SC CDBG Ball
Field
Ligh3ng
at
Six
Loca3ons 










2,100,000
 37
Charleston SC CDBG Brifle
Bank
Park
Pier
Restora3on
and
Bank
Stabiliza3on 










2,500,000
 44
Charleston SC CDBG City
of
Charleston
Rosemont
Development 










2,000,000
 50
Charleston SC CDBG Gilchrist
Proper3es 










1,500,000
 50
Charleston SC CDBG Elliotborough
Park 










3,000,000
 51
Charleston SC CDBG Dill
Tract
Park
Development 










3,000,000
 53
Charleston SC CDBG Waterfront
Park
Restora3on 










3,000,000
 53
Charleston SC CDBG Stoney
Field
Renova3on 










5,000,000
 89
Charleston SC CDBG Ladson
House
Redevelopment 










2,000,000
 100
Charleston SC CDBG Mee3ng
&
Morrison
Street
Revitaliza3on 










2,000,000
 100
Charleston SC CDBG Concord
Park 










6,500,000
 111
Charleston SC CDBG Boyer's
Court
&
Indian
Street
Redevelopment 










2,000,000
 120
Charleston SC CDBG Reuse/Redevelopment 










2,000,000
 200
Charleston SC CDBG St.
Phillip/Fishburne
Proper3es 










2,500,000
 200
Charleston SC CDBG West
Ashley
Site 










3,000,000
 200
Charleston SC CDBG City
Wide
Aqua3c
Facilites
Repairs/Renova3ons 








12,000,000
 215
Charleston SC CDBG Dill
Tract
Park
Development
Phase
II 








18,000,000
 242
Charleston SC CDBG Charleston
Development
Academy 










3,000,000
 250
Charleston SC CDBG CRBN
Infrastructure 








16,290,000
 255
Charleston SC CDBG St.
Andrews
Garden
Apartments 










3,000,000
 350
Charleston SC CDBG Johns
Island
Five
Acre
Site 










2,750,000
 400
Charleston SC CDBG Horizon
Parking
Deck 








24,000,000
 408
Charleston SC CDBG Ray
Site
on
Johns
Island 










2,400,000
 660
Charleston SC Energy City
Hall
Geothermal
Expansion 










1,000,000
 18
Charleston SC Energy Cainhoy
Fire
Sta3on 










2,750,000
 48
Charleston SC Energy Carolina
Bay
Fire
Sta3on 










2,750,000
 48
Charleston SC Energy Renova3on
of
116
Mee3ng
Street 










3,200,000
 57
Charleston SC Energy Replacement
of
Incandescent
Traffic
Signals
with
LED
Technology 










5,000,000
 75
Charleston SC Energy New
City
Gym 










8,900,000
 151
Charleston SC Energy Municipal
Building 








20,000,000
 354
Charleston SC Energy Daniel
Island
Housing
Development 










3,000,000
 400
Charleston SC Energy City
of
Charleston
Rehabillitaion
of
owner‐occupied
homes. 










5,200,000
 520
Charleston SC Housing New
Construc3on
of
Affordable
Housing 










1,470,000
 27
Charleston SC Housing Capital
Reinvestment
II 










2,078,575
 42
Charleston SC Housing Kiawah
Homes,
Charleston
Peninsula
public
housing
interior
renova3on 










2,135,000
 67
Charleston SC Housing Capital
Reinvestment 










3,785,641
 75
Charleston SC Public
Safety Invesi3ga3ve
Analysis
Sobware 












150,000
 2
Charleston SC Public
Safety Conversion
to
Charleston
County
Digital
Radio
System 










1,750,000
 4
Charleston SC Public
Safety Flashover
Simulator 












100,000
 6
Charleston SC Public
Safety DNA
Laboratory 










1,370,000
 8
Charleston SC Public
Safety IBIS
Lab 












497,995
 9
Charleston SC Public
Safety Public
Safety
Wi‐Fi
and
Video
Surveillance
System 










4,000,000
 17
Charleston SC Public
Safety New
Police
Officers 










1,031,116
 20
Charleston SC Public
Safety Public
Safety
Training
Center 










2,000,000
 31
Charleston SC Schools Classroom
ligh3ng
improvements
at
12
schools 














62,000
 5
Charleston SC Schools Install
Visitor
Management
Systems
at
all
schools 














66,000
 5
Charleston SC Schools Security
Ves3bules
Installa3on
at
5
schools 














35,000
 5
Charleston SC Schools Energy
Monitoring
and
Control
System
Improvements 












140,000
 10
Charleston SC Schools Electronic
Access
Controls
Installa3on
at
13
schools 












325,000
 15
Charleston SC Schools Video
Distribu3on
Upgrades
at
22
schools 










3,300,000
 25
Charleston SC Schools Construc3on
of
Perimeter
Fencing
at
10
schools 












530,000
 30
Charleston SC Schools Video
Surveillance
Systems
Installa3on
at
14
schools 












700,000
 35
Charleston SC Schools Memminger
Elementary
School‐Renovate
the
11
1/2
St.
Phillips
Street
Annex 










2,500,000
 40
Charleston SC Schools Install
Security
Upgrades
@
14‐schools 










1,700,000
 80
Charleston SC Schools Technology
Infrastructure
Improvements
at
17
schools 










1,230,000
 80
Charleston SC Schools Playground
Improvements
at
20
schools 










1,450,000
 100
Charleston SC Schools Seismic
Repairs
to
the
Courtenay
Campus 










7,800,000
 120
Charleston SC Schools Burke
High
School
Career
Center 










6,000,000
 150
Charleston SC Schools CCSD
Emergency
and
Opera3ons
Center 








10,500,000
 200
Charleston SC Schools Rebuild
and
Expand
Charleston
Montessori
School 








18,700,000
 280
Charleston SC Schools Classroom
Technology
Moderniza3on
at
30
schools 










9,800,000
 300
Charleston SC Schools Rebuild
Stono
Park
Elementary
School 








26,500,000
 400
City State Program Project
Descrip3on Funding
Required Jobs
Charleston SC Schools Rebuild
Harborview
Elementary
School 








31,500,000
 475
Charleston SC Schools Rebuild
Buist
Academy 








34,000,000
 500
Charleston SC Schools Rebuild
James
Simons
Elementary
School 








33,800,000
 500
Charleston SC Schools Rebuild
Memminger
Elementary
School 








36,800,000
 550
Charleston SC Schools Rebuild
St
Andrews
Elementary
School 








37,000,000
 555
Charleston SC Streets/Roads West
Ashley
Greenway
Stono
Creek
Bridge
Replacement 












400,000
 7
Charleston SC Streets/Roads Construc3on
of
Turn
Lanes
at
Glenn
McConnell
Parkway
and
Bairds
Cove 












500,000
 8
Charleston SC Streets/Roads West
Ashley
Bike
Way
Extension
Pier 












800,000
 14
Charleston SC Streets/Roads Construc3on
of
Intersec3on
of
Cooper
Street
at
Mee3ng
Street 










1,000,000
 15
Charleston SC Streets/Roads Ashley
River
Road
Bike/Pedestrian
Path
Extension 










1,000,000
 18
Charleston SC Streets/Roads Herriot
Street
Crossover
from
King
Street
to
Mee3ng
Street
construc3onand
Railroad
Crossing
Gates 










2,000,000
 30
Charleston SC Streets/Roads Maybank
Highway
at
Riverland
Drive
construc3on
of
Turn
Lanes 










3,000,000
 45
Charleston SC Streets/Roads Highway
61
Moreland
Pedestrian
Safety
Improvements
and
Reconstruc3on 










4,000,000
 60
Charleston SC Streets/Roads Courtenay
Drive/Bee
Street
Highway
Improvements 










5,000,000
 75
Charleston SC Streets/Roads Ashley
River
Walk
Connec3on 










5,000,000
 85
Charleston SC Streets/Roads Spring/Cannon
Streetscape
2‐Way
Conversion 










6,300,000
 95
Charleston SC Streets/Roads Mee3ng
Street‐Morrison
Drive
Connector
Road
in
Downtown
Charleston 










7,000,000
 105
Charleston SC Streets/Roads US
17
North
Bike/Pedestrain
Retrofit
Project 










8,000,000
 120
Charleston SC Streets/Roads Wappoo
Cut
Bridge
Bicycle/Predestrian
Retrofit
Project
&
Construc3on
of
Sidewalks
Leading
to
and
from
the

Bridge 










8,000,000
 120
Charleston SC Streets/Roads Highway
7
at
Highway
171
Intersec3on
Reconstruc3on
and
Pedestrian
Improvements 










8,500,000
 128
Charleston SC Streets/Roads World
War
II
Memorial
Bridge
Retrofit
Project
(Northbridge) 










9,300,000
 140
Charleston SC Streets/Roads Construc3on
of
Interchange/Circle
of
Glenn
McConnell
Parkway
and
Bees
Ferry
Road 








13,000,000
 195
Charleston SC Streets/Roads Huger
Street
Reconstruc3on
and
Construc3on
of
Sidewalks 








14,000,000
 210
Charleston SC Streets/Roads SC
7
at
61
Intersec3on
Reconstruc3on
and
Pedestrain
Improvements 








14,000,000
 210
Charleston SC Streets/Roads Glenn
McConnell
Parkway/Paul
Cantrell
Blvd.
Highway
Widening
and
Interchange
with
Interstate
526 








15,000,000
 225
Charleston SC Streets/Roads James
Island
Creek
Bridge
Replacement
and
Harbor
View
Road
Widening‐Phase
II 








15,000,000
 225
Charleston SC Streets/Roads Bees
Ferry
Road
Infrastructure
Improvement 








20,000,000
 300
Charleston SC Streets/Roads Calhoun
Street
and
Courtenay
Drive
Intersec3on
Reconstruc3on
and
Pedestrian
Bridge 








20,000,000
 300
Charleston SC Streets/Roads James
Island
Highway
Improvement
Project 








20,000,000
 300
Charleston SC Streets/Roads Maybank
Highway
Local
Roadway
Network 








20,000,000
 300
Charleston SC Streets/Roads SC
171
(Wesley
Dr.)
Highway
Improvements
and
Greenway
Bridge 








20,000,000
 300
Charleston SC Streets/Roads Morrison
Drive
Reconstruc3on 








25,000,000
 375
Charleston SC Streets/Roads Reconstruc3on
of
King
and
Mee3ng
Street
North 








35,000,000
 525
Charleston SC Streets/Roads John's
Island
Road
Improvements 








45,000,000
 675
Charleston SC Transit Maintenance
Facility
Upgrade 










1,000,000
 25
Charleston SC Transit Transit
Coaches
Replacement
(36) 








10,800,000
 100
Charleston SC Water Playground
Road
Pump
Sta3on
Replacement
Design 












400,000
 6
Charleston SC Water Wagner
Terrace
Storm
Drain
Rehabilita3on 












440,000
 6
Charleston SC Water West
Ashley
Sewer
Tunnel
Replacement
Study 












440,000
 6
Charleston SC Water Ashe
Street
Water
Line
Replacement‐Line
to
Spring
Street 












273,125
 7
Charleston SC Water Ashley
Avenue
Water
Line
Replacement‐Cannon
To
Calhoun
Street 












575,000
 7
Charleston SC Water Calhoun
Street
Water
Line
Replacement‐Pif
to
Anson
Street 












874,000
 7
Charleston SC Water Church
Street
Water
Line
Replacement‐Tradd
to
South
Market
Street 












632,500
 7
Charleston SC Water Drake
Street
Water
Line
Replacement‐Columbus
to
South
Street 












379,500
 7
Charleston SC Water East
Bay
Street
Water
Line
Replacement‐Cooper
to
Chapel
Street 












862,500
 7
Charleston SC Water George
Street
Water
Line
Replacement‐St.
Philip
to
Coming
Street 












189,750
 7
Charleston SC Water Glebe
Street
Water
Line
Replacement‐George
to
Wentworth
Street 












205,563
 7
Charleston SC Water Hutson
Street
Water
Line
Replacement 












201,250
 7
Charleston SC Water Line
Street
Water
Line
Replacement‐Mee3ng
Street
to
Hanover
Street 












215,625
 7
Charleston SC Water Line
Street
Water
Line
Replacement‐President
to
King
Street 












920,000
 7
Charleston SC Water Percy
Street
Water
Line
Replacement‐Line
to
Spring
Street 












273,125
 7
Charleston SC Water Prioeau
Street
Water
Main
Replacement 












316,250
 7
Charleston SC Water Queen
Street
Water
Line
Replacement‐Franklin
to
Kng
Street 












408,250
 7
Charleston SC Water Reid
Street
Water
Line
Replacement‐Nassau
to
East
Bay
Street 












465,750
 7
Charleston SC Water Short
Street
Water
Line
Replacement‐
Franklin
to
Logan
Street 












132,250
 7
Charleston SC Water South
Street
Water
Line
Replacement‐Nassau
to
Drake
Street 












362,250
 7
Charleston SC Water Stocker
Drive
Water
Main
Replacement 












267,700
 7
Charleston SC Water Lower
Folly
Road
Water
Main
Replacement 












625,000
 8
Charleston SC Water Bereford
Commercial
Sewer
Trunk
Main
Extension 












190,800
 10
Charleston SC Water Coming
Street
Water
Line
Replacement‐Vanderhorst
to
Beaufain 












790,625
 11
Charleston SC Water Johns
Island
Sewer
Extension‐Sailfish
to
Maybank
Highway 












820,000
 11
Charleston SC Water Pump
Sta3on
Rehabilita3on
Project
Phase
1 












986,000
 13
Charleston SC Water Sewer
Collec3on
System
Rehabilita3on
Phase
1 












583,000
 13
Charleston SC Water Pif
Street
Water
Main
Replacement 










1,220,000
 16
Charleston SC Water Spring
Street
Water
Lline
Replacement‐Hagood
to
Mee3ng
Street 










1,523,750
 21
Charleston SC Water America
Street
Water
Main
Replacement 










2,585,000
 36
Charleston SC Water Pump
Sta3on
84
Upgrade 










3,035,700
 42
Charleston SC Water Seawall
Rehabilita3on‐Phase
1 










3,000,000
 42
Charleston SC Water Johns
Island
Sewer
Interceptor
Extension
Phase
1 










3,372,000
 47
City State Program Project
Descrip3on Funding
Required Jobs
Charleston SC Water Brick
Arch
Rehabilita3on 










5,000,000
 70
Charleston SC Water Peninsula
Trunk
Main‐Phase
1A 








16,407,338
 230
Charleston SC Water Market
Street
Drainage
Improvement 








30,000,000
 420
Charleston SC Water Spring/Fishburne/Hwy
17
Drainage
Improvement
Project
Phase
I 








60,000,000
 840
Columbia SC Airport Install
New
Perimeter
Security
Fencing 












657,548
 20
Columbia SC Airport Construct
New
U3li3es
and
Service
Road
to
West
Cargo
Area 










1,135,387
 30
Columbia SC Airport Rehabilitate
Airport
Perimeter
Roads
(East
Side) 










2,493,750
 30
Columbia SC Airport Rehabilitate
Airport
Perimeter
Roads
(West
Side) 










3,649,525
 35
Columbia SC Airport Residen3al
Sound
Insula3on
Project
–
Phase
2 










1,225,000
 40
Columbia SC Airport Construct
New
Stub
Taxiway 










2,424,723
 55
Columbia SC Airport Rehab
Taxiways
“GG”,
“HH”
and
“N” 










1,153,924
 55
Columbia SC Airport Runway
11/29
Keel
Sec3on
Reconstruc3on 








13,694,387
 85
Columbia SC CDBG Water
and
Shaw
Streets
Redev. 














70,000
 5
Columbia SC CDBG Bethel
Bishop
Chappelle
Community
Center. 












333,000
 25
Columbia SC CDBG Burton
Hgts.
Neighborhood
Redevelopment
Community
Center
‐

Low
Income
Census
Tract. 












500,000
 50
Columbia SC CDBG City
of
Columbia
Homeless
Shelter
Facility
Improvements
‐
Road
Construc3on
of

½
Mile
Facility

Improvements. 












500,000
 50
Columbia SC CDBG South
Edisto
Park
‐
Rosewood
Low
Income
Census
Tract
Neighborhood
S.
Edisto
Ave. 












500,000
 50
Columbia SC CDBG Village
at
Rivers
Edge
Infrastructure. 










2,000,000
 100
Columbia SC CDBG Assisted
Living
Housing
Facility
for
Disabled
Low
Income
Census
tract
Neighborhood


25
Units. 










3,750,000
 125
Columbia SC CDBG Columbia
Housing
Development
Corp.
BridgePointe
Infrastructure. 










4,500,000
 200
Columbia SC CDBG City
of
Columbia
Comprehensive
Parks
Renewal
Project
for
the
Benefit
of
Low
Income
Census
Tract

Neighborhoods.
Rosewood
Parks,
Earlewood
Parks,
Finlay
Park,
Hyaf
Park,
Drew
Park,
Greenview
Park. 








20,000,000
 500
Columbia SC Energy Projected
annual
energy
savings
$244,247
Columbia SC Energy Build‐out
of
hydrogen
fueling
sta3on
with
natural
gas
fueling
capacity 










2,500,000
 5
Columbia SC Energy Convert
3‐way
Valves
to
2‐way
w/VSD
Pumping
at
Washington
Square
Administra3on
Building
The
project
proposes
to
replace
the
3‐way
chilled
water
valves
with
new
2‐way
control
vales
and
installing

Variable
Frequency
Drive
on
the
chilled
water
circula3on 














23,678
 5
Columbia SC Energy Installa3on
of
on‐site
hydrogen
back0up
power
systems
for
area
cell
towers. 












400,000
 10
Columbia SC Energy Installa3on
of
on‐site
hydrogen
dispensers
for
fork‐lib
hydrogen
bafery
applica3ons. 










2,100,000
 10
Columbia SC Energy Upgrade
Elevators
at
Washington
Square
Administra3on
building
The
project
proposes
to
modernize
and
improve
the
opera3ons
of
three
elevators.
The
building
is
used
as
an

administra3on
building
where
the
Public
has
access
to
pay
u3li3es
bills,
license 












766,006
 10
Columbia SC Energy Photovoltaic
Electric
Power
Genera3on
at
Fire
Sta3ons

The
project
proposes
to
install
a
solar
photovoltaic
electric
power
system
at
each
Fire
Sta3on.
The
system
will

provide
1.0kilowaf
of
electricity
to
power
120‐volt
electric
loads.
Projected
annua 












137,877
 15
Columbia SC Energy Ligh3ng
System
Improvements:The
project
proposes
to
install
new
ligh3ng
systemsthat
will
provide
a
high

quality
visual
environment
that
is
energy
efficient,
low
maintenance,
and
cost
effec3ve.
Exis3ng
T12
ligh3ng

systems
will
be
replaced
with
new
T8 










2,140,913
 24
Columbia SC Energy Energy
Management
System/
Controls
Upgrade.
The
project
proposes
to
install
new
Energy
Management

Systems
and
modify
exis3ng
EMS
in
facili3es
throughout
the
City.
Projected
annual
energy
savings
$44,809 












531,564
 25
Columbia SC Energy HVAC
Equipment
Upgrades
The
project
proposes
to
replace
exis3ng
units
with
like
type
energy
efficient
heat
pumps
in
Park
and
Recrea3on

Buildings
and
Fire
Sta3ons.
Projected
annual
energy
savings
$34,147 












624,876
 25
Columbia SC Energy New
HVAC
System
at
City
Hall
The
project
proposes
to
replace
the
water
cooled
system
and
split
system
AC
units

and
the
associated
steam

boiler
and
cooling
tower

with
a
variable
refrigerant
flow
zoning
system.
The
system
will
provide
simultaneous

hea3n 










1,346,697
 25
Columbia SC Energy Photovoltaic
Electric
Power
Genera3on‐
Parking
Garages
The
project
proposes
to
retrofit
exis3ng
parking
garages
with
a
combina3on
of
photovoltaic
arrays
and
light‐
emiqng
diode
ligh3ng
fixtures.
Projected
annual
savings
$31,688 










2,575,866
 25
Columbia SC Housing Broad
River
Terrace
Affordable
Housing
Community. 












500,000
 50
Columbia SC Housing Redevelopment
of
La3mar
Manor
Affordable
Housing
Community. 












500,000
 50
Columbia SC Housing Columbia
Housing
Authority
‐
Final
Phases
of
Rosewood
Hills
Housing
Development
Infrastructure. 










1,000,000
 75
Columbia SC Public
Safety License
Recogni3on
Sobware
Project 












200,000

Columbia SC Public
Safety Ouzit
command
Star
One
(mobile
unit),
LCD
projec3on
screen/monitor,
outdoor
ligh3ng
equipent,
mobile
800

MHZ
radios,
digital
recording
equipment,
mobile
dispatching
consoles,
toughbooks,
satelite
telephones,

portable/mobile
security
cameras 














85,300

Columbia SC Public
Safety Police
AVL
Project 












230,000

Columbia SC Public
Safety Records
Management
System 










1,400,000

Columbia SC Public
Safety Tasers 












198,550

Columbia SC Public
Safety IT
System
Administrator 














64,000
 1
Columbia SC Public
Safety CCTV
Surveillance
System
Sec3on
6
and
Surveillance
Officers 










2,905,610
 4
Columbia SC Public
Safety Purpose:Afempt
to
combat
the
safety
concerns
created
by
the
increasing
numbers
of
homeless
persons
in
the

Main
Street,
Vista
and
Five
Points
areas.5
‐
Previously
sworn
law
enforcement
officers
@$47,668
(including

fringe)Total
cost:
$238,340‐Methodology‐T 












302,562
 6
Columbia SC Public
Safety Warrant/Mental
Health
Transport,
corporal
and
police
officers,
uniforms
&
equipment,
office
furniture,
gas
&

petroleum
Products,
vehicle
repair/service
&
supply,
warrant
filing
system,
unmarked
police
vehicles 












604,170
 9
Columbia SC Public
Safety SROs
&
Patrol
Vehicles
&
equipment,
SRO
Officers
slary,
uniforms
&
equipment 










1,840,834
 19
Columbia SC Public
Safety Police
Officers
Salary
&
fringe
benefits,
uniforms
&
equipment,
Patrol
vehicles
&
Equipment 










7,266,450
 75
Columbia SC Schools Server
Consolida3on.
Purchase
new
servers
and
re3re/consolidate
school
servers. 












695,000
 5
Columbia SC Schools Wireless
access
for
schools.

Proivde
befer
access
to
students
in
classrooms. 












751,000
 20
Columbia SC Schools Replace
Mechanical
Units
in
2
schools. 










3,000,000
 45
Columbia SC Schools Purchase
and
Install
Projectors
&
SmartBoards.
Installs
new
teaching
tool
for
classroom
instruc3on 










4,833,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Columbia SC Schools Energy
Efficient
Ligh3ng
and
Controls.
Replaces
old
lights
and
balasts
for
new
energy
efficient
type
with
3me

controls
fo
energy
savings. 










5,000,000
 150
Columbia SC Schools Automated
HVAC
Controls
for
Schools.
Provide
energy
controls
for
mechnical
systems
at
schools 










7,500,000
 200
Columbia SC Streets/Roads Main
Street
Reconfigura3on
Phase
III 








15,000,000
 20
Columbia SC Streets/Roads North
Main
Street
Reconfigura3on
Phase
1B 








13,000,000
 20
Columbia SC Streets/Roads Harden
Street
Reconfigura3on
Phase
II 








25,000,000
 40
Columbia SC Water Water:Valve
and
Hydrant
Replacement 










1,500,000
 5
Columbia SC Water Sewer:Broad
River
Pump
Sta3on
Rehabilita3on 










2,000,000
 10
Columbia SC Water Sewer:North
Columbia
Pump
Sta3on
Rehabilita3on 










3,000,000
 10
Columbia SC Water Sewer:Saluda
River
Pump
Sta3on
Rehabilita3on 










2,000,000
 10
Columbia SC Water Sewer:Main
Rehabilita3on 










7,000,000
 15
Columbia SC Water Sewer:Saluda
River
Force
Main
Replacement 










2,000,000
 15
Columbia SC Water Water:Rehabilita3on:
Replacement 










6,000,000
 15
Columbia SC Water Water:Rehabilita3on:Clean
and
Line
Pipe 










4,000,000
 15
Columbia SC Water Sewer:54”
and
48”
Ouzall
Rehabilita3on 








13,000,000
 20
Columbia SC Water Sewer:Crane
Creek
Ouzall
Replacement 










4,000,000
 20
Columbia SC Water Sewer:Main
Replacement 










3,000,000
 20
Columbia SC Water Sewer:Mill
Creek
Force
Main
Replacement 










2,500,000
 20
Columbia SC Water Domes3c
Water
Conserva3on
The
project
proposes
to
reduce
domes3c
water
consump3on
in
all
City
facili3es
by
replacing
or
retrofiqng
all

standard
water
fixtures
with
High
Efficiency
Systems.
Projected
annual
savings
$15,130 












278,773
 25
Columbia SC Water Water:Canal
WTP
HS
Pump
and
RW
Pump
Replacement 








25,000,000
 25
Columbia SC Water Metro
Wastewater
Treatment
Plant
Digester
Gas
U3liza3on
The
project
proposes
to
make
repairs
to
the
anaerobic
digesters,
digester
gas
system
and
mul3ple
hearth

incinerators
in
order
to
maximize
the
beneficial
use
of
digester
gas
and
minimize
the
use
o 








10,248,455
 30
Hardeeville SC Streets/Roads Construc3on
of
new
Interstate
95
Exit
3
in
South
Carolina,
new
Purrysburg
Road
4‐Lane
Road
and

complimentary
intersec3on
improvements. 








93,924,000
 1499
Rock
Hill SC Streets/Roads Name:
Galleria
Blvd.
Extension
Descrip3on:
This
is
a
road
construc3on
project
to
link
Galleria
Blvd.
from
the
future
Mee3ng
Street
intersec3on

to
Red
River
Road.

Both
Galleria
Blvd.
and
Red
River
Road
are
the
major
roads
serving
and
linking
two
co











1,750,000
 50
Rock
Hill SC Streets/Roads Name:
Riverview
Road
Improvements
Descrip3on:
Through
York
County
Pennies
for
Progress,
funding
is
requested
to
upgrade
the
exis3ng
two
lane

road
to
include
adding
curb
and
gufer,
sidewalks,
and
drainage
improvements.

In
order
to
support
major
priv 










1,474,104
 50
Rock
Hill SC Streets/Roads Name:
Cel
River
Road
Improvements

Descrip3on:
Rock
Hill,
South
Carolina
extending
from
the
intersec3on
of
US‐21
and
SR161
east
for

approximately
6000
feet
to
the
Riverfalls
Business
Park.

Comple3on
of
this
project
will
directly
support
the

planned 










3,900,000
 75
Rock
Hill SC Water Name:
Raw
Water
Intake
48MGD
Upgrade
Descrip3on:
This
project
will
upgrade
the
City
of
Rock
Hill’s
raw‐water
intake
facility
on
Lake
Wylie.

The

capacity
will
increase
from
30
MGD
to
48
MGD.

This
capacity
is
necessary
to
allow
the
full
opera3on
 










3,500,000
 30
Sumter SC CDBG Codes
Enforcement
Personnel
for
Appearance
Maintenance
Ordinance 












350,000
 10
Sumter SC CDBG Community
Sidewalk
&
Trails
Project 










1,500,000
 15
Sumter SC CDBG Removal
of
Slum
and
Blight
Project 










1,000,000
 15
Sumter SC Energy Energy
Retrofit
of
City
Facili3es
Project 










2,000,000
 20
Sumter SC Housing Door
replacement 














11,700
 1
Sumter SC Housing Dumpster
replacement 















9,000
 1
Sumter SC Housing Floor
3le
and
base
board
improvements 














21,238
 1
Sumter SC Housing Interior
door
casing
replacement 















7,100
 1
Sumter SC Housing Landscaping,
rain
gardens
and
signs 














25,000
 1
Sumter SC Housing Raise
clean‐out
caps 














10,000
 1
Sumter SC Housing Refrigerator
replacement 















8,000
 1
Sumter SC Housing Replacement
of
electrical
panels 














42,000
 1
Sumter SC Housing Thermal
blankets
for
water
heaters 














12,500
 1
Sumter SC Housing Concrete
and
sidewalk
project 














30,000
 2
Sumter SC Housing Powerflush
3olets 














33,725
 2
Sumter SC Housing Replacement
of
water
heaters 














56,700
 2
Sumter SC Housing Electrical
and
exhaust
fan
replacement 














70,000
 3
Sumter SC Housing Lawn
services 














40,500
 3
Sumter SC Housing Electric
stove
conversion
with
safety
elements 














99,000
 4
Sumter SC Housing Public
Housing
repair
‐
skim
coa3ng/drywall
ceiling
repair 














85,000
 4
Sumter SC Housing Bathroom
renova3ons 














88,000
 5
Sumter SC Housing Roofing
in
Pinewood 














80,000
 5
Sumter SC Housing Pain3ng 












105,000
 6
Sumter SC Housing Security 














47,000
 8
Sumter SC Public
Safety Build
fiber
network
inclusive
of
public
digital
cameras
for
public
safety 










2,200,000
 10
Sumter SC Public
Safety Security

Equipment
for
City
Parks 












500,000
 10
Sumter SC Public
Safety Install
mobile
data
terminals
and
digital
dash
video
systems 










4,300,000
 15
Sumter SC Public
Safety Migrate
all
public
safety
radios
to
P25 










4,500,000
 15
Sumter SC Public
Safety Public
Safety
Radio
Communica3on
on
I‐95
corridor 










5,200,000
 15
Sumter SC Streets/Roads Alice
Drive
‐
U.S.
521
to
Wesmark
Blvd. 










8,350,000

Sumter SC Streets/Roads Improvements
to
City
Roads 










2,500,000
 25
Sumter SC Transit Five
public
transporta3on
buses 










1,214,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Sumter SC Water Nazerene
Church
Road
U3lity
Improvements 












750,000
 10
Sumter SC Water Nefles
Road
U3lity
Improvements 












150,000
 10
Sumter SC Water 15
South
Industrial
Park
Welland
U3lity
Improvements 












650,000
 15
Sumter SC Water Boulevard
Road
to
U.S.
521
‐
20,735
feet
at
$30
a
foot 












622,050
 15
Sumter SC Water Clipper
Road
well 












650,000
 15
Sumter SC Water Old
Manning
Road/Beulah
Cuqno
‐
29,000'
at
$30
a
foot 












870,000
 15
Sumter SC Water Tindal
Road
‐
11,500'
at
$30
a
foot 












345,000
 15
Sumter SC Water Water
Plant
Improvements 












960,000
 15
Sumter SC Water Willis/Community/Shot
Pouch
Drainage
Improvements 












275,000
 15
Sumter SC Water Wilson
Hall
Bridge
Waterline 












100,000
 15
Sumter SC Water 521
Industrial
Park
U3lity
Improvements 










1,500,000
 20
Rapid
City SD Energy Rapid
City
Energy
Plant
Improvements 










9,000,000
 60
Rapid
City SD Streets/Roads Rapid
City
Eglin
Street
Construc3on 










1,300,000
 10
Rapid
City SD Streets/Roads Rapid
City
East
Anamosa
Reconstruc3on 










3,000,000
 20
Rapid
City SD Streets/Roads Rapid
City
Public
Parkign
Garage 










7,000,000
 46
Rapid
City SD Water Rapid
City
Knollwood
Drainage
Improvements 










2,000,000
 14
Rapid
City SD Water Rapid
City
Elk
Vale
Sewer
Construc3on 










2,500,000
 16
Rapid
City SD Water Rapid
City
Canyon
Lake
Dam
Reconstruc3on 










6,000,000
 30
Rapid
City SD Water Rapid
City
Water
Treatment
Plants 






140,000,000
 466
Sioux
Falls SD CDBG City
Hall
Annex
HVAC
controls:
This
project
updates
the
HVAC
controls
in
the
Annex. 












200,000
 6
Sioux
Falls SD CDBG City
Hall
Elevator:
The
project
will
replace
the
present
an3quated
elevator
in
City
Hall. 












600,000
 6
Sioux
Falls SD CDBG City
Hall
HVAC
System:
This
project
will
replace
the
obsolete
HVAC
system
at
City
Hall,
which
includes
replacing

the
original
boilers,
installing
digital
controls,
and
associated
equipment
that
will
bring
the
air
quality
in
the

building
up
to
current
ASHR 












900,000
 10
Sioux
Falls SD CDBG Caille
Branch
Library
and
Ronning
Branch
Library
Improvements
including
a
new
roof,
ice
and
water
shields,

security
systems
and
carpet 












200,000
 30
Sioux
Falls SD CDBG Public
Parking
ramp:
This
project
includes
the
construc3on
of
a
new
public
parking
ramp
providing

approximately
1,000
parking
stalls
in
the
downtown
area.
This
new
ramp
would
act
as
a
catalyst
to
support

addi3onal
redevelopment
opportuni3es
downtown
wh 








18,000,000
 360
Sioux
Falls SD Energy Energy
Efficient
Traffic
and
Street
Ligh3ng
Systems:
These
projects
will
replace
older,
inefficient
incandescent

traffic
signals
and
streetlights
with
high‐efficiency
LED
lamps. 










2,000,000
 40
Sioux
Falls SD Public
Safety Fire
Rescue
Training
Center
Academic
Building:
This
project
will
provide
for
an
addi3on
and
major
renova3ons

to
the
current
30‐year‐old
training
center
academic
building.
This
will
allow
us
to
incorporate
modern

technologies
into
the
curriculum
and
host 










1,250,000
 30
Sioux
Falls SD Public
Safety Fire
Rescue
Training
Center
Tower:This
project
will
replace
the
30‐year‐old
training
fire
building
that
is
u3lized

by
fire
departments
and
law
enforcement
agencies
across
the
region.
Interagency
training
has
been
scaled

back
un3l
the
current
tower
can
b 










2,750,000
 50
Sioux
Falls SD Public
Safety Construc3on
of
an
ins33tu3onal
fiber
network 










3,000,000
 144
Sioux
Falls SD Streets/Roads Benson
Road
Expansion:
The
project
will
improve
access
to
a
growing
retail
and
office
development
in
western

Sioux
Falls. 










2,800,000
 56
Sioux
Falls SD Streets/Roads Maple
Street
Expansion
West:
The
project
will
improve
safety
and
access
to
a
major
university
campus
and

residen3al
neighborhood
in
northwest
Sioux
Falls. 










3,400,000
 68
Sioux
Falls SD Streets/Roads Southeastern
Avenue
Extension:
The
project
will
improve
access
to
a
residen3al
growth
area
in
southern
Sioux

Falls. 










3,500,000
 70
Sioux
Falls SD Streets/Roads Maple
Street
Expansion
East:
This
project
will
expand
the
City’s
transporta3on
system
and
connect
two
heavily

used
regional
recrea3on
facili3es. 










7,000,000
 140
Sioux
Falls SD Streets/Roads 69th
Street
Railroad
Overpass:
The
project
will
improve
safety
for
a
nearby
residen3al
area
that
includes
a
K‐12

educa3onal
campus
and
a
college
athle3c
complex.
 










7,500,000
 150
Sioux
Falls SD Streets/Roads Rail
Reloca3on
Project:
The
project
includes
construc3on
of
a
new
rail
yard,
trestle,
and
accompanying

connec3ons
in
Sioux
Falls.
The
exis3ng
tracks
would
be
removed
to
allow
for
redevelopment
of
land
in

downtown
Sioux
Falls.
When
fully
built
out,
the 










8,000,000
 160
Sioux
Falls SD Streets/Roads 85th
Street
and
Interstate
29
Interchange:
The
project
will
provide
access
to
over
200
acres
of
land
planned
for

a
new
medical/office/retail
center
that
will
include
the
crea3on
of
over
8,000
new
jobs
for
the
region. 








20,000,000
 400
Sioux
Falls SD Streets/Roads 69th
Street
Extension/Interstate
29/Interstate
229
Reconstruc3on:
The
project
will
provide
a
cri3cal
east‐west

link
for
the
region’s
transporta3on
system
and
will
alleviate
traffic
conges3on
on
local
roads
and
the
interstate

highway
system. 








25,000,000
 500
Sioux
Falls SD Streets/Roads Sioux
Falls
Flood
Control
Project:
This
project
includes
raising
the
current
levees,
reconstruc3on
of
the
41st

Street
bridge
over
the
Big
Sioux
River,
and
construc3on
of
a
dam
to
protect
property
totaling
$750
million
in

value
from
flooding. 








35,000,000
 700
Sioux
Falls SD Streets/Roads South
Dakota
Highway
100:
Construc3on
of
a
new
four‐lane
divided
highway
to
alleviate
conges3on
on
exis3ng

state
highways
and
local
roads.
Approximately
one
mile
of
the
en3re
18
miles
has
been
completed.
 






100,000,000
 2000
Sioux
Falls SD Water Covell
Lake
Bank
Stabiliza3on:
This
project
will
stabilize
the
banks
of
Covell
Lake
to
prevent
erosion
of
the

shoreline
and
improve
the
water
quality.

The
bank
stabiliza3on
will
protect
Madison
Street
on
both
sides,

protect
improvements
made
near
the
l 










1,000,000
 20
Sioux
Falls SD Water Water
Supply,
Storage,
and
Distribu3on
Enhancements:
The
project
will
include
expansion
of
the
City’s
above

and
below
ground
storage
capabili3es,
new
well
construc3on,
and
replacement
of
aging
distribu3on
lines. 








28,000,000
 560
Sioux
Falls SD Water Central
Main
Sanitary
Sewer:
This
project
includes
the
reconstruc3on
and
expansion
of
a
cri3cal
segment
of

the
sanitary
sewer
system
located
along
the
Big
Sioux
River. 








31,000,000
 620
Cleveland TN Airport Construc3on
of
Airport
$5,060,000.

Sewer
for
Airport
$5,000,000 








10,060,000
 100
Cleveland TN CDBG CDBG
Projects:
public
facili3es,
pedestrian
access
to
high
density
housing,
improvement
to
curb,
gufer
and


sidewalks. 










2,000,000
 30
Cleveland TN Housing Veterans
Nursing
Home
Construc3on 










4,300,000
 310
Cleveland TN Public
Safety 800
mhz
Radio
System
and
Tower
for
all
county‐wide
public
safety
communica3on.

 












500,000
 15
Cleveland TN Public
Safety Fire
Training
Tower
 












400,000
 55
Cleveland TN Schools Parker
Street
Extension
for
Mayfield
Elementary
School

 












950,000
 40
City State Program Project
Descrip3on Funding
Required Jobs
Cleveland TN Schools New
Construc3on
of
Cleveland
High
School
Science
Wing
 










8,000,000
 200
Cleveland TN Streets/Roads APD
40
Interchange
&
Exit
20
Improvements 








20,000,000
 100
Cleveland TN Streets/Roads Cleveland
By‐Pass
to
State
Route
40(Waterlevel)
to
Paul
Huff
Pkwy.
 








12,000,000
 100
Cleveland TN Streets/Roads Paul
Huff
Pkwy
extension
to
Freewill
Road.

 










4,500,000
 100
Germantown TN Public
Safety Fire
Sta3on
Number
4
located
at
3031
Forest
Hill‐Irene
Road,
was
originally
constructed
in
the
late
1960’s.

The

facility
is
in
a
state
of
disrepair
including
numerous
water
leaks,
termite
damage
and
mold
throughout
the

building.
The
new
sta3on
will
be
 










2,100,000
 36
Germantown TN Streets/Roads Moore
Road
Improvements
‐
Improvements
to
the
unimproved
sec3on
of
Moore
Road
that
is
adjacent
to

Germantown
High
School. 












200,000
 3.5
Germantown TN Streets/Roads Forest
Hill
‐
Irene
Road
Improvements
‐
Comple3on
of
the
improvements
to
Forest
Hill‐
Irene
Road
between

Poplar
Avenue
and
Poplar
Pike
and
the
Intersec3on
of
Forest
Hill‐
Irene
and
Forest
Hill
way
to
correct
a
sight

distance
problem. 












350,000
 6
Germantown TN Streets/Roads McVay
Road
‐
Improvements
to
Mcvay
Road
that
will
eliminate
a
hazardous
90
degree
curve
and
an
old
bridge.











1,750,000
 31
Germantown TN Streets/Roads Farmington
Boulevard
Rehab
‐
Complete
rehab
of
Farmington
Boulevard,
a
primary
east‐west
artery
that
has

seen
a
ten
fold
increase
in
traffic
resul3ng
in
damage
to
the
roadway
and
sub
grade. 










2,538,000
 44
Germantown TN Streets/Roads Germantown
Realignment
‐
Improved
alignment
to
Germantown
Road
that
will
eliminate
traffic
through
the

Business
District. 










5,200,000
 100
Germantown TN Streets/Roads Poplar
Avenue

Culvert
Replacement
‐
Replacement
of
26
corrugated

metal
culverts
that
are
failing
and

crea3ng
a
safety
problem. 










8,000,000
 138
Germantown TN Water Moore
Road
Water
Main
‐
Installa3on
of
700
linear
feet
of
8"
water
main
in
Moore
Road
replacing
an
old

transite
water
line 














70,000
 1.5
Germantown TN Water Arthur
Road
Water
Main
‐
Installa3on
of
1,500
linear
feet
of
8 












200,000
 3.5
Germantown TN Water Arthur
Road
Drainage
‐
Improvement
to
an
old
WPA
drainage
way
from
Aruthr
Road
west
to
Germantown
Road













300,000
 6
Germantown TN Water Forest
Hill‐Irene
Water
Main
Extension
‐
Installa3on
of
7,500
linear
feet
of
16 












550,000
 9.5
Germantown TN Water Johnson
Road
Sewer
Lib
Sta3on
‐
Replacement
of
a
22‐year‐old
sanitary
sewer
lib
sta3on
that
is

malfunc3oning
and
beyond
repair 












600,000
 11
Germantown TN Water Shady
Creek
Weir
‐
Replacement
of
a
weir
in
Shady
Creek
that
is
in
danger
of
failing
due
to
damage
from
flood

waters 












700,000
 12
Germantown TN Water Lateral
E
Weir
‐
Repair
of
a
weir
that
is
failing
in
Lateral
E
at
the
confluence
of
the

Wolf
River
that
is
causing
a

severe
bank
erosion
problem
and
threatening
a
walking
trail
and
lake 












800,000
 14
Germantown TN Water Miller
Farms
Sewer
Improvements
‐
Improvements
to
the
Miller
Farms
Sewer
Ouzall
to
add
addi3onal
capacity

to
handle
addi3onal
flows
generaged
by
new
commercial
development 












962,000
 17
Germantown TN Water Miller
Farms
Drainage
‐
Improvements
to
a
deteriorated
open
channel
drainage
way
from
Pyron
Oaks
Cove

north
to
Weeping
Willow
Road 










1,100,000
 19
Germantown TN Water Lateral
F
‐
Repair
of
1,000
linear
feet
of
concrete
channel
lining
that
is
failing
and
threatening
to
block
flow
in

the
drainageway. 










2,000,000
 35
Germantown TN Water Mimosa
Gardens
Drainage
‐
Improvements
to
a
50‐year‐old
storm
water
drainage
system
to
reduce
the
treat
of

flood
within
the
Mimosa
Gardens
neighborhood 










2,000,000
 35
Germantown TN Water Wolf
River
Boulevard
Water
Main
Extension
‐
Installa3on
of
1,200
linear
feet
of
12 100
Jackson TN CDBG Comple3on
of
Anderson
Creek
Park
4 














75,000
 5
Jackson TN CDBG Day
Shelter
for
Homeless
Renova3on 














30,000
 5
Jackson TN CDBG Turning
Point
Safehaven
Comple3on 














50,000
 5
Jackson TN CDBG Community
Services.
Build
a
transi3onal
living
facility
for
women
and
children
that
have
been
adversely

affected
by
alcohol
and
drug
abuse. 












500,000
 10
Jackson TN CDBG Downtown/East
Jackson
Street
Ligh3ng
Project
Expansion 












120,000
 10
Jackson TN CDBG Minor/Emergency
Repair
Program
3 












150,000
 10
Jackson TN CDBG Single
Family
Rental
Infill
Development 












200,000
 10
Jackson TN CDBG Infill
property
development
North
Royal
Street 












300,000
 20
Jackson TN CDBG Target
Rehab/Replacement
Housing
Geographic
Expansion 












750,000
 25
Jackson TN CDBG Phillips
St.
Reconstruc3on
Project 












325,000
 30
Jackson TN CDBG Small
Business
Incubator
Development‐Chester
Street 












300,000
 30
Jackson TN Housing Redevelopment
and
stabaliza3on
of
blighted
downtown
areas
by
construc3ng
office
and
retail
space.
 








30,000,000
 100
Jackson TN Public
Safety Visonair
Web
Based
computer
system;
replace
an3quated
AS
400; 










2,500,000
 5
Jackson TN Public
Safety Intraoperable
communica3ons
system
for
disasters
and
public
safety
incidents.
 










8,000,000
 10
Jackson TN Public
Safety Construc3on
of
a
consolidated
EMS
Center
that
would
facilitate
communica3ons
between
emergency

management,
city
and
county
pubic
safety
en33es
during
cri3cal
situa3ons.
 










7,000,000
 50
Jackson TN Schools New
high
school
to
replace
a
50
plus
year
old
school
in
a
very
congested
area 








27,000,000
 300
Jackson TN Streets/Roads Intelligent
Transporta3on
System
which
will
enhanse
the
signaliza3on
and
3ming
of
congested
traffic
paferns.
 










2,700,000
 10
Jackson TN Streets/Roads Widen
the
highly
congested
Hollywood
Drive
from
Interstate
40
to
70
By‐Pass 










4,000,000
 50
Jackson TN Transit Construc3on
of
an
alterna3ve
fuel
conversion
sta3on

Jackson TN Transit Central
office
for
municipal
transit
system
to
supliment
new
opera3ons
center 












300,000
 20
Jackson TN Transit Construc3on
of
airport
hangers 










1,400,000
 20
Jackson TN Water Stormwater,
Resovoir,
upgrades 












500,000
 10
Johnson
City TN CDBG Bristol
Highway
Bicycle/Pedestrian
Trail 








10,000,000

Johnson
City TN CDBG Construc3on
of
new
fire
sta3on 










2,000,000

Johnson
City TN CDBG Keystone
Neighborhood
Revitaliza3on/Community
Center 








15,000,000

Johnson
City TN CDBG King
Creek
Flooding
Mi3ga3on 








15,000,000

Johnson
City TN CDBG Winged
Deer
Bicycle/Pedestrian
Trail 












530,000

Johnson
City TN Schools Construc3on
of
new
Fairmont
Elementary
School
to
replace
exis3ng
school 








16,000,000

Johnson
City TN Streets/Roads ‐street
milling
and
resurfacing 








10,000,000

Johnson
City TN Water ‐sewer
interceptor
line
replacement
and
upgrade 










7,000,000

Johnson
City TN Water ‐sewer
lib
sta3on
upgrades
to
increse
capacity
and
structural
integrity 










7,000,000

City State Program Project
Descrip3on Funding
Required Jobs
Johnson
City TN Water ‐water
transmission
line
replacement
and
upgrades 










1,500,000

Johnson
City TN Water ‐water
treatment
plant
improvements











1,500,000

Knoxville TN Streets/Roads BETHEL
AVE:

KUB
Water
Project
‐
Cast
Iron
(7,500
lf). 










2,200,000
 6
Knoxville TN Streets/Roads BRUHIN
ROAD:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(8,300
lf). 










1,500,000
 6
Knoxville TN Streets/Roads CHESTERFIELD
AREA:

KUB
Water
Project
‐
Galvanized
Main
(8,800
lf). 












490,000
 6
Knoxville TN Streets/Roads COESTA
CIRCLE:

KUB
Water
Project
‐
Galvanized
Main
(3,700
lf). 












252,000
 6
Knoxville TN Streets/Roads COLONIAL
VILLAGE
AREA:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(13,000
lf). 










1,500,000
 6
Knoxville TN Streets/Roads CONCORD
STREET:

KUB
Water
Project
‐
Cast
Iron
(2,600
lf). 












575,000
 6
Knoxville TN Streets/Roads CURTIS
ROAD:

KUB
Water
Project
‐
Galvanized
Main
(2,700
lf). 












150,000
 6
Knoxville TN Streets/Roads DEERFIELD
AREA:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(12,000
lf). 










1,300,000
 6
Knoxville TN Streets/Roads DUNCAN
ROAD
AREA:

KUB
Water
Project
‐
Galvanized
Main
(5,945
lf). 












900,000
 6
Knoxville TN Streets/Roads HOLSTON
DRIVE:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(19,000
lf). 










1,700,000
 6
Knoxville TN Streets/Roads LONSDALE
AREA:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(18,000
lf). 










1,650,000
 6
Knoxville TN Streets/Roads NORTHSHORE
‐
PHASE
I:

KUB
Water
Project
‐
Increase
Capacity
(6,500
lf). 










1,000,000
 6
Knoxville TN Streets/Roads OLD
DANDRIDGE
PIKE:

KUB
Water
Project
‐
Increase
Capacity
(5,200
lf). 












468,000
 6
Knoxville TN Streets/Roads RAMBLING
ACRES:

KUB
Water
Project
‐
Galvanized
Main
(8,500
lf). 












550,000
 6
Knoxville TN Streets/Roads RIFLE
RANGE
ROAD:

KUB
Water
Project
‐
Galvanized
Main
(5,200
lf). 












520,000
 6
Knoxville TN Streets/Roads RIVERSIDE
DRIVE:

KUB
Water
Project
‐
Cast
Iron
(2,200
lf). 












800,000
 6
Knoxville TN Streets/Roads SCHUBERT
ROAD
AREA:

KUB
Water
Project
‐
Galvanized
Main
(6,000
lf). 












350,000
 6
Knoxville TN Streets/Roads SOUTH
HILLS
DRIVE
AREA:

KUB
Water
Project
‐
Galvanized
Main
(14,000
lf). 










1,400,000
 6
Knoxville TN Streets/Roads SUTHERLAND
AVE:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(12,000
lf). 










1,250,000
 6
Knoxville TN Streets/Roads PAVEMENT
MARKING
MAINTENANCE
CITYWIDE:

Restripe
all
currently
striped
roadways
throughout
the
City. 












500,000
 9
Knoxville TN Streets/Roads GUARDRAIL
IMPROVEMENT
CITYWIDE:

Replace
outdated
lengths
of
guardrail
throughout
the
City. 












350,000
 14
Knoxville TN Streets/Roads MARY
JAMES
PARK
RESTORATION:

Reshape
exis3ng
alignment
of
Baker
Creek
to
a
more
natural
state
thus

improving
water
quality
by
decreasing
erosion
and
introducing
vegeta3on. 














50,000
 14
Knoxville TN Streets/Roads TRANSFER
STATION
WATER
QUALITY
UNIT:

Install
drainage
devices
at
solid
waste
transfer
sta3on
to
address

illicit
discharge
into
storm
drainage
system. 














25,000
 14
Knoxville TN Streets/Roads ALLEY
PAVING
CITYWIDE:

Regrade
and
pave
100
alleys
throughout
the
City. 










1,500,000
 19
Knoxville TN Streets/Roads CITYWIDE
STREET
LIGHT
INSTALLATION:

Installa3on
and
replacement
of
street
lights
along
City
streets. 










1,500,000
 20
Knoxville TN Streets/Roads DOWNTOWN
SIDEWALK
REPLACEMENT:

Replace
sidewalk
along
Market
Street
from
Cumberland
Avenue
to

Church
Avenue. 












250,000
 20
Knoxville TN Streets/Roads TRAFFIC
SIGNAL
UPGRADES
CITYWIDE:

Upgrade
exis3ng
traffic
signals,
school
flashers,
and
pedestrian
signals

throughout
the
City. 










1,600,000
 21
Knoxville TN Streets/Roads SIGNAL
RETIMING/RENOVATION
CITYWIDE:

Re3me
and
rephase
signals
along
arterials
throughout
the
City. 












500,000
 24
Knoxville TN Streets/Roads ADA
IMPROVEMENTS
TO
COLISEUM:

Install
elevator
in
coliseum
parking
garage
and
restripe
parking
spaces.


Increase
accessible
sea3ng
in
Coliseum. 










1,000,000
 25
Knoxville TN Streets/Roads CHESTNUT
STREET
REALIGNMENT:

Reconstruc3on
of
intersec3on
including
property
acquisi3on,
u3li3es

reloca3on,
and
road
construc3on. 












400,000
 25
Knoxville TN Streets/Roads FIRST
CREEK
DRAINAGE
IMPROVEMENTS:

Construc3on
of
an
overflow
channel
along
First
Creek
and
two
new

bridges
at
Emorland
and
Fairmont
Blvd. 










3,500,000
 25
Knoxville TN Streets/Roads WESTLAND
DRIVE
BRIDGE
REPLACEMENT:

Replace
narrow
bridge
under
Westland
Drive
and
channel

improvements
upstream
to
alleviate
roadway
flooding. 












880,000
 25
Knoxville TN Streets/Roads RESURFACING
CITYWIDE:

Resurface
100
miles
of
asphalt
roadway
throughout
the
City. 








12,000,000
 29
Knoxville TN Streets/Roads CROSS
PARK
DRIVE
DRAINAGE
IMPROVEMENTS:

Drainage
improvements
along
Cross
Park
Drive
from
Park

Village
Road
to
Cross
Creek
Road. 










2,200,000
 35
Knoxville TN Streets/Roads VALLEY
VIEW
REALIGNMENT
PROJECT:

Relocate
roadway
to
intersect
Washington
Pike
at
Centerline
Drive. 










1,600,000
 35
Knoxville TN Streets/Roads CURB
CUTS
CITYWIDE:

Install
1000
curb
cuts
at
intersec3ons
with
exis3ng
sidewalks
throughout
the
City. 










1,400,000
 38
Knoxville TN Streets/Roads SIDEWALK
REPLACEMENT
CITYWIDE:

Replace
260,000
square
feet
of
deteriorated
sidewalks
throughout
the

City. 










1,100,000
 38
Knoxville TN Streets/Roads GAY
STREET
STREETSCAPES:

Reconstruc3on
of
the
100
and
200
blocks
of
Gay
Street.
 










3,500,000
 55
Knoxville TN Streets/Roads VESTAL
BUSINESS
DISTRICT
INFRASTRUCTURE:

Construc3on
of
public
plaza,
greenway,
sidewalks,
and
curbs;

creek
and
stormwater
improvements;
reloca3on
of
Chappell
Road. 










1,600,000
 55
Knoxville TN Streets/Roads ADA
IMPROVEMENTS
TO
CITY
FACILITIES:

Renova3on
of
20
city
facili3es
to
improve
accessibility
to
people

with
disabili3es. 










2,500,000
 75
Knoxville TN Streets/Roads SOUTH
WATERFRONT
PUBLIC
IMPROVEMENTS:


Land
purchases
and
construc3on
of
a
new
park,
streets,
and

u3li3es
to
revitalize
former
industrial
waterfront
area.









18,000,000
 85
Allen TX CDBG Arts
of
Collin
County
Performing
Arts
Hall.

$80,000,000
joint
project
with
Ci3es
Allen,
Frisco
and
Plano.

Need

funds
to
cover
infla3on
generated
gap. 








20,000,000
 400
Allen TX CDBG Arts
of
Collin
County
Performing
Arts
Hall.
$80,000,000
joint
project
with
Ci3es
Allen,
Frisco
and
Plano.
Need

funds
to
cover
infla3on
generated
gap. 








20,000,000
 400
Allen TX Public
Safety Animal
Shelter
Expansion
to
meet
the
service
needs
of
this
rapidly
growing
area.
 












750,000
 7
Allen TX Public
Safety Fire
Sta3on
Number
5‐This
is
a
new
fire
sta3on
for
this
rapidly
growing
City.

This
sta3on
will
have
have
1

ambulance
and
engine
company
crea3ng
18
new
firefighter/paramedic
jobs
upon
comple3on.
This
facilty
is

planned
as
a
LEED
pla3num
facility.

 










3,500,000
 20
Allen TX Public
Safety City
of
Allen
Service
Center/Public
Safety
Training
Facility‐This
new
facility
will
have
over
60,000
sf
of
office

space,
shop
space,
and
classroom
space
with
a
240,000
sf
public
safety
driving
track. 








14,500,000
 75
Allen TX Streets/Roads Wafers
Road‐This
project
includes
the
construc3on
of
5,500
feet
of
2
addi3onal
lanes
on
this
regional
arterial.

This
will
bring
the
total

number
of
lanes
from
2
to
4. 










2,250,000
 11
Allen TX Streets/Roads Bethany
Drive
Widening‐This
project
includes
8,000
feet
of
roadway
widening
where
2
addi3onal
lanes
will
be

added
to
this
exis3ng
4‐lane
divided
regional
arterial
from
Allen
Heights
to
Angel
Parkway.

 










3,300,000
 16
Allen TX Streets/Roads Ridgeview
Drive
Custer
Road
to
ALma
Drive‐This
project
includes
the
construcion
of
8,800
feet
of
this
regional

arterial
as
a
4‐lane
divided
roadway
to
meet
the
con3nuing
traffic
demands
in
this
rapidly
growing
urban
area.
 










7,300,000
 36
City State Program Project
Descrip3on Funding
Required Jobs
Allen TX Streets/Roads Ridgeview
Drive
from
Stacy
Road
to
US
75‐This
7000
foot
project
includes
4
new
lanes
of
regional
divided

arterial. 










8,700,000
 44
Allen TX Water Highmeadow
Sewer
Replacement‐This
project
replaces
9200
feet
of
exis3ng
8"and
4"
clay
sewer/service
lines


with
PVC
lines
in
this
1960's
residen3al
neighborhood

This
project
will
benefit
107
residen3al
homes. 










1,000,000
 5
Allen TX Water Hillside
Water
Tower
Replacement‐This
project
includes
a
2
million
gallon
elevated
water
tower
that
replaces
a

func3onally
obsolete
500,000
gallon
water
tank
ocnstructed
in
the
early
1970's
and
replaces
2500
feet
of

asbestos
cement
water
line
with
pvc. 










5,000,000
 25
Arlington TX Airport Installa3on
of
Medium‐Intensity
Approach
Ligh3ng
System
with
Runway
Alignment
Indicator
(MALSR) 










1,600,000
 12
Arlington TX Airport Taxiway
ligh3ng
system 










1,000,000
 12
Arlington TX Airport Airport
security
enhancements
‐
new
fencing,
integrated
security
systems,
electronic
gates,
and
other

improvements
designed
to
meet
new
regula3ons
under
discussion
at
TSA 










1,000,000
 17
Arlington TX Airport Installa3on
of
airport
security 










1,000,000
 17
Arlington TX Airport Northeast
airport
development
area
internal
access
road
and
access
taxiway 










2,000,000
 20
Arlington TX Airport Aircrab
parking
apron
construc3on 










2,850,000
 24
Arlington TX Airport Construc3on
of
new
airport
hangars 










2,200,000
 34
Arlington TX Airport Construc3on
of
new
terminal
building 










5,100,000
 73
Arlington TX Airport 5000'
west
parallel
taxiway 








11,000,000
 98
Arlington TX CDBG Weatheriza3on
program
in
NRSA 












500,000
 2
Arlington TX CDBG Hugh
Smith
Recrea3on
Center
Replacement 










2,100,000
 4
Arlington TX CDBG Bridge
repain3ng
(Randol
Mill,
Nolan
Ryan
&
Center/Mesquite) 












450,000
 10
Arlington TX CDBG Crystal
Canyon
Nature
Preserve
Development 












600,000
 10
Arlington TX CDBG Move
u3li3es
underground
in
Founders
Plaza 












300,000
 10
Arlington TX CDBG Skate
Park
Development 










1,000,000
 10
Arlington TX CDBG Vandergriff
Park
Trail
System 










1,000,000
 10
Arlington TX CDBG Wimbledon
Park
Renova3ons 












300,000
 10
Arlington TX CDBG BC
Barnes
Park
Renova3ons 












600,000
 15
Arlington TX CDBG City
Hall
First
Floor
Remodel 










2,000,000
 15
Arlington TX CDBG OS
Gray
Nature
Preserve
Development 












100,000
 15
Arlington TX CDBG Vandergriff
Park
Roadways/Parking
Lots 










1,500,000
 15
Arlington TX CDBG Veterans
Park
Renova3ons 










1,000,000
 15
Arlington TX CDBG Accessibility
improvements
throughout
NRSA
(eg.
ADA
ramps) 










1,000,000
 20
Arlington TX CDBG East
Branch
Library
expansion 










1,000,000
 20
Arlington TX CDBG New
Data
Center 










1,000,000
 20
Arlington TX CDBG Purvis
House
Historic
Preserva3on 










1,000,000
 20
Arlington TX CDBG Sewer
Service
lines
for
low
income
households
in
NRSA 










1,000,000
 20
Arlington TX CDBG Southwest
Nature
Preserve
Development 










2,000,000
 20
Arlington TX CDBG Treepoint
Park
Development 










1,500,000
 20
Arlington TX CDBG Webb
Community
Park
Roadway/Parking/Trails 










3,500,000
 20
Arlington TX CDBG Catholic
Chari3es'
Foster
Youth
Facility 












250,000
 24
Arlington TX CDBG Construct
one
downtown
parking
garage 








15,000,000
 25
Arlington TX CDBG Lake
Arlington
Community
Room 










2,500,000
 25
Arlington TX CDBG Arlington
Tennis
Center
Expansion 










4,000,000
 30
Arlington TX CDBG CW
Difo
Golf
Course
Renova3ons 










6,000,000
 30
Arlington TX CDBG Linear
Park
Trail
Development
(Bowman
Branch,
Rush
Creek,
Sublef
Creek) 










6,000,000
 30
Arlington TX CDBG Mixed‐Use
Development
with
CDBG
used
for
new
office,
retail,
infrastructure 












500,000
 30
Arlington TX CDBG River
Legacy
Parks
Roadways/Parking
Lots 










4,000,000
 30
Arlington TX CDBG Aqua3c
facility
renova3ons 










5,000,000
 35
Arlington TX CDBG Harold
Paferson
Sports
Center
Renova3ons 








10,000,000
 35
Arlington TX CDBG Recrea3on
Center
renova3ons 










5,000,000
 35
Arlington TX CDBG Mar3n
Luther
King
Jr.
Sports
Development
Center 










6,000,000
 40
Arlington TX CDBG Tierra
Verde
Banquet
Center 










8,000,000
 40
Arlington TX CDBG Webb
Community
Park
Development 










6,000,000
 40
Arlington TX CDBG Playground
renova3ons
at
15
neighborhood
and
community
parks 










3,000,000
 45
Arlington TX CDBG Downtown
parking
garage
for
joint
use
by
public
and
UTA
students 








30,000,000
 50
Arlington TX CDBG NRSA
Streets,
Sidewalk,
Sewer,
Street
Lights
(Town
North
and
East
Arlington
Police
Repor3ng
Areas) 










3,500,000
 50
Arlington TX CDBG Bicycle,
shared‐path,
connected
trails
and
sidewalk
projects 










2,500,000
 90
Arlington TX CDBG Conven3on
Center
Parking
Garage 








23,000,000
 140
Arlington TX CDBG Conven3on
Center
Expansion 








39,000,000
 212
Arlington TX Energy Conven3on
Center
Roof
Top
Voltaic
Solar
Array
35KW
to
Power
Emergency
Ligh3nig 












500,000
 5
Arlington TX Energy City
Renewable
Energy
Genera3on
Project
‐Solar
and
wind‐power
installa3ons
on
municipal
buildings 












782,500
 28
Arlington TX Energy Residen3al
Energy
Efficiency
Project
‐Energy
audits
for
single
family
residen3al
homes 








16,057,500
 57
Arlington TX Public
Safety Commercial
Motor
Vehicle
Unit
expansion
(2
vehicles
fully
equiped
for
detail) 












136,454

Arlington TX Public
Safety Computer
forensic
equipment 














57,000

Arlington TX Public
Safety Covert
Ops/Narco3cs
surveillance
vehicle 












130,000

Arlington TX Public
Safety Drug
interdic3on/human
trafficking
unit
(vehicles
and
equipment) 












258,218

Arlington TX Public
Safety DWI
vehicles
to
increase
interdic3on 












212,666

Arlington TX Public
Safety Homeland
Security
Unit
(4
all
terrain
vehicles,
10
human
transport
vehicles) 












134,000

Arlington TX Public
Safety Jail
maintenance
&
improvements
(transfer
vehicle,
intoxilizer
machine,
fingerprint
machine) 












620,500

Arlington TX Public
Safety Laser
equipment
for
Patrol
&
Traffic
(phased
replacement/addi3on
of
200
units) 












400,000

Arlington TX Public
Safety Patrol
carbine
rifles
(47) 














56,815

Arlington TX Public
Safety SWAT
equipment
(support
vehicle,
mobile
command
unit,
explosive
entry
program,
armored
vehicle) 










1,600,000

City State Program Project
Descrip3on Funding
Required Jobs
Arlington TX Public
Safety Taser
deployment
(600
units) 












729,000

Arlington TX Public
Safety Traffic
and
DWI
Unit
equipment
(cameras,
motor
tour
pack) 














78,766

Arlington TX Public
Safety Unmanned
aircrab
program
to
increase
surveillance
and
security 












625,000

Arlington TX Public
Safety Wireless
broadband
to
improve
vehicle
communica3on 












211,000

Arlington TX Public
Safety Addi3onal
police
officer
staffing 










1,005,000
 15
Arlington TX Schools Provide
addi3onal
classroom
technology
(scanners,
cameras,
document
cameras) 










2,000,000

Arlington TX Schools Provide
graphing
calculators
for
math
classrooms 












690,000

Arlington TX Schools Provide
science
probeware
equipment
for
science
classrooms 












425,000

Arlington TX Schools Replacement
of
old
printers
with
new
equipment 












500,000
 0.5
Arlington TX Schools Upgrade/repair
auditorium
at
Hutcheson
JH 














75,000
 0.8
Arlington TX Schools Provide
a
new
student
management
system
to
provide
befer
access
to
data
for
district
decision
making 










1,600,000
 1
Arlington TX Schools Provide
updated
technology
to
Career
and
Technology
classrooms 










1,000,000
 1
Arlington TX Schools Replacement

of
older
network
equipment
and
file
servers
with
new
equipment 










1,800,000
 1
Arlington TX Schools Provide
addi3onal
computer
lab
access
via
laptop
computers
to
each
campus 










2,450,000
 2
Arlington TX Schools Replacement
of
7,8
and
9
year
old
computers
with
new
equipment 








14,000,000
 4
Arlington TX Schools Upgrade
and
modernize
electrical
systems
at
5
schools 












550,000
 4.2
Arlington TX Schools Replace/repair
worn
compe33on
tracks 












535,000
 5.5
Arlington TX Schools Purchase
and
installa3on
of
projec3ons
systems
in
each
AISD
classroom
to
improve
instruc3on 










4,772,600
 6
Arlington TX Schools Structural
Repairs
(roofs,
founda3on,
brick)
at
Arlington
HS
Gym
B,
Workman
JH,
Blanton
Elem.
and
Thornton

Elem. 












420,000
 7.8
Arlington TX Schools Construct
12
new
science
labs
to
meet
new
state‐mandated
curriculum
requirement
that
students
have
4

credits
in
science 










3,876,000
 37.5
Arlington TX Schools Upgrade
old
HVAC
equipment
with
energy‐efficient
equipment
at
28
schools 










3,865,000
 37.9
Arlington TX Streets/Roads Abram
Street
Bridge
over
Johnson
Creek‐right
of
way
acquisi3on
and
construc3on 










6,250,000
 25
Arlington TX Streets/Roads Center
Street
Bridge
over
IH20‐
right
of
way
acquisi3on
and
construc3on 








14,250,000
 50
Arlington TX Streets/Roads Mansfield
Webb
Road
(Matlock
to
New
York) 








26,000,000
 60
Arlington TX Streets/Roads Construc3on
of
Abram
Street
‐
Collins
Street
to
SH360,
including
bridge
over
Johnson
Creek
‐
right
of
way

acquisi3on
and
construc3on 








18,700,000
 75
Arlington TX Streets/Roads Lincoln
Drive
extension,
Lamar
to
Center
Street
Bridge 










3,500,000
 100
Arlington TX Transit Con3nua3on
of
Commuter
Bus
Program
from
Arlington
to
Fort
Worth 












100,000
 10
Arlington TX Transit Contract
with
a
transit
service
provider
to
connect
the
exis3ng
commuter
rail
sta3on
with
key
des3na3ons
and

employment
centers. 










1,000,000
 48
Arlington TX Transit Purchase
of
CNG‐ar3culated
BRT
vehicles
for
transit
service
to
connect
the
exis3ng
commuter
rail
sta3on
with

key
des3na3ons
and
employment
centers. 










4,800,000
 48
Arlington TX Transit Build
an
intermodal
center 










1,200,000
 62
Arlington TX Water Replacement
of
the
exis3ng
iron
removal
equipment
in
the
water
treatment
plant
because
it
is
at
the
end
of
its

useful
life. 












460,000
 13
Arlington TX Water Build
30,000
gallon,
elevated
water
storage
tank.
Modifica3ons
to
the
water
treatment
plant
due
to
the

storage
tank
include
booster
pumps
and
plant
piping
and
control
modifica3ons. 












900,000
 25
Arlington TX Water Johnson
Creek
Sanitary
Sewer,
Roosevelt
to
Center
Street 












600,000
 6
Arlington TX Water Johnson
Creek
Sanitary
Sewer,
through
UTA
campus 












700,000
 6
Arlington TX Water Johnson
Creek
Sanitary
Sewer,
Waverly
to
north
of
Mayfield 












800,000
 6
Arlington TX Water Design
and
construc3on
of
transfer
valves
at
Bowen
Road/Arkansas
Lane
and
SH360/Arkansas
Lane 












500,000
 10
Arlington TX Water Viridian
Developement
Water
Reuse
Project 










1,500,000
 30
Arlington TX Water Reclaimed
water
line‐sanitary
sewer
connec3on
from
Arlington
to
Village
Creek
Wastewater
Treatment
Plant 










3,500,000
 35
Arlington TX Water Arkansas
Lane
(Browning
Drive
to
State
Highway
360)‐water
and
street
infrastructure
rebuild 








10,000,000
 100
Aus3n TX Airport Airport
Access
Road
Overhead
Signage
Improvements
to
improve
on
site
traveling
efficiency
for
the
public. 










3,800,000
 25
Aus3n TX Airport Rehabilitate
Airside
Taxiway
shoulders
to
reduce
airfield
foreign
object
debris 










3,000,000
 25
Aus3n TX Airport Airfield
Joint
Sealant
and
General
Avia3on
Apron
Rehabilita3on 










7,500,000
 50
Aus3n TX Airport Overflow
Parking
Lot
1600‐1800
spaces
to
accommodate
need
for
local
growth
and
diminishing
excess
parking

capacity
at
Aus3n
Bergstrom
Intl
Airport. 








11,700,000
 75
Aus3n TX Energy Solar
Photovoltaic
Systems
in
public
facili3es,
businesses
and
residences 












250,000
 5
Aus3n TX Energy Residen3al
and
commercial
solar
development 












300,000
 6
Aus3n TX Energy Lamar
Street
Bridge
Ligh3ng
Project 












100,000
 12
Aus3n TX Energy Solar
Photovoltaic
System 












570,000
 12
Aus3n TX Energy Replace
exis3ng
fluorescent
lamps
with
new
energy
efficient
lamps 










1,500,000
 15
Aus3n TX Energy Walnut
Creek
Wastewater
Treatment
Plant
‐
Energy
efficiency
upgrades 










2,500,000
 15
Aus3n TX Energy Technicenter
Building
System
Improvements
Project 










1,800,000
 25
Aus3n TX Energy Replacement
of
non
func3on
PV
modules 










3,500,000
 30
Aus3n TX Energy Building
Commissioning
Training
for
operators
and
managers
of
public
and
private
sector
commercial
facili3es 












250,000
 35
Aus3n TX Energy Zilker
Botanical
Garden
Trail
Ligh3ng
Project 












175,000
 36.5
Aus3n TX Public
Safety Public
Safety
Training
Facility 








25,000,000
 198
Aus3n TX Public
Safety Municipal
Court/APD/
NE
Substa3on 










6,240,000
 226
Aus3n TX Schools Aus3n
Independent
School
District
‐
Health
and
safety‐related
renova3ons
and
repairs
‐
15
schools 












565,481
 10
Aus3n TX Schools Aus3n
Independent
School
District
‐
Hea3ng,
ven3la3on
and
air‐condi3oning
‐
4
schools 












935,649
 17
Aus3n TX Schools Aus3n
Independent
School
District
‐
Campus
renova3ons
‐
3
schools 










1,879,070
 35
Aus3n TX Schools Aus3n
Independent
School
District
‐
Providing
access
for
low
income
students
to
broadband
communica3ons

from
home 








15,000,000
 40
Aus3n TX Schools Aus3n
Independent
School
District
‐
Upgrading
classroom
technology 








20,000,000
 40
Aus3n TX Schools Aus3n
Independent
School
District
‐
Roofing
repairs
‐
4
schools 










2,980,462
 55
Aus3n TX Schools Aus3n
Safe
Routes
To
School
supplemental
funding:

monies
will
be
spent
to
supplement
city/school

infrastructure
monies 










3,000,000
 60
City State Program Project
Descrip3on Funding
Required Jobs
Aus3n TX Schools Aus3n
Independent
School
District
‐
Electrical
power
load
balancing
‐
35
schools,
1
facility 










3,325,952
 61
Aus3n TX Streets/Roads Purchase
and
install
computer
technology
necessary
to
allow
web
access
to
exis3ng
200
plus
arterial
traffic

cameras
and
other
traffic
informa3on
devices 












800,000
 10
Aus3n TX Streets/Roads Purchase
and
install
Variable
Message
Signs
on
major
highways
and
arterials
to
manage
special
events
in

Central
Aus3n
and
provide
improved
driver
informa3on. 










5,000,000
 25
Aus3n TX Streets/Roads Purchase
and
install
vehicle
detec3on
sta3ons
using
toll‐tag
registra3on
tags 










6,000,000
 25
aus3n TX Transit 20
Signals
(various
loca3ons)










 










2,400,000

Aus3n TX Transit Aus3n
Urban
Rail
Project:
purchase
vehicles
and
maintenance
equipment 








60,000,000
 0
Aus3n TX Transit Capital
Metro
‐
Replacement
of
paratransit
vehicle
fleet
(purchase
of
74
vehicles) 










4,000,000
 10
Aus3n TX Transit Capital
Metro
‐
Replacement
and
expansion
of
bus
fleet
(purchase
of
101
buses) 








36,000,000
 15
Aus3n TX Transit Capital
Metro
‐
Bus
Stop
Signage
project 










1,040,000
 49
Aus3n TX Transit Purchase
and
install
Transit
Fare
&
Parking
Management
Kiosks 










5,000,000
 50
Aus3n TX Transit Capital
Metro
‐
New
Manor
Park
and
Ride 










2,800,000
 132
Aus3n TX Transit Capital
Metro
‐
Expansion
of
Intelligent
Transporta3on
System
(ITS)
Technologies 










5,000,000
 235
Aus3n TX Transit Capital
Metro
‐
Rails
with
Trails
(Hike
and
Bike
trail
along
Redline
ROW) 










6,900,000
 324
Aus3n TX Transit Upgrade
exis3ng
MetroRail
commuter
rail
line 








80,000,000
 400
Aus3n TX Transit Capital
Metro
‐
New
South
IH‐35
Park
and
Ride 








11,100,000
 522
Aus3n TX Transit Capital
Metro
‐
Phase
II
Expansion
of
MetroRail
Red
Line 






190,000,000
 5875
aus3n TX Water Carver
Historic
Museum
Interior
Renova3on. 












290,000

Aus3n TX Water Adjustment
of
4
water
valves
and
one
blow‐off
drain
line
to
grade
in
order
to
accommodate
Loop
360
@

Westlake
Drive
State
Highway
Improvement
project 














50,000
 1
Aus3n TX Water Reloca3on
of
500
LF
of
8”
waterline
on
Old
Manor
Road
@
Walnut
Creek
to
accommodate
State
Highway

improvement
project 












200,000
 1
Aus3n TX Water Lib
Sta3on
RTU
Telemetry
Replacement
Project 












540,000
 2
Aus3n TX Water Lifle
Walnut
/
Bufermilk
–
Phase
II
Wastewater
Line
Rehabilita3on:
replace
deteriorated
wastewater
lines. 












556,000
 3
Aus3n TX Water Package
Plant
Hypochlorite
System
to
generate
liquid
or
gas
chlorine
on
site. 












480,000
 3
Aus3n TX Water Capitol
Metro/COA
MLK
Storm
Drain
Improvements 












137,000
 4
aus3n TX Water Raul
Alvarez
Disc
Golf
Course:

This
project
will
develop
a
36‐hole
disc
golf
course
that
will
be
environmentally

and
financially
sustainable.

 












886,000
 4
Aus3n TX Water S.
Congress
Ave
Wastewater
Upgrade:
upsize
wastewater
line
for
addi3onal
capacity. 












750,000
 4
Aus3n TX Water SAR
WWTP
roof
replacement
for
the
Secondary
Treatment
building 












350,000
 4
Aus3n TX Water SAR
WWTP
Valve
and
Gate
replacement 












500,000
 4
Aus3n TX Water West
Bank
Lib
Rehab 












600,000
 4
Aus3n TX Water 24”
Force
Main
Rehabilita3on
&
12”
Force
Main
Rehabilita3on 












500,000
 5
Aus3n TX Water Govalle
/
Crosstown
Various
Segments
Wastewater
Line
Rehabilita3on:
replace
deteriorated
wastewater
lines. 












863,000
 5
Aus3n TX Water Pemberton
Heights
PH
1
‐
Exis3ng
2500
LF
water
line
is
deteriorated
and
aged. 










1,000,000
 5
Aus3n TX Water Replace
doors
in
Hornsby
Bend,
Walnut
and
SAR
WWTP
facili3es
w/Chemproof(fiberglass
door) 












360,000
 5
Aus3n TX Water Demoli3on
on
Santa
Rita
St.
{E.
4th/Perdenales
LF} 














25,000
 6
Aus3n TX Water Onion
Creek
SSO
Rehabilita3on
Project
to
replace
and
reroute
deteriorated
wastewater
lines 










1,229,000
 6
Aus3n TX Water SAR
WWTP
Scum
Processing
Improvements 










1,800,000
 6
Aus3n TX Water South
Area
Regional
WWTP
(SAR)
Preliminary
Treatment
Building
Improvements 










1,200,000
 6
Aus3n TX Water South
Area
Regional
WWTP
(SAR)
Replace
fine
pore
diffusers
in
one
train
including
the
air
piping
grid
in
the

aera3on
basins. 










1,200,000
 6
Aus3n TX Water Guerrero
Park
Main 










1,800,000
 7
Aus3n TX Water Reloca3on
of
6,000
LF
of
16”
waterline
on
FM
2304
–
Ravenscrob
to
FM
1625
to
accommodate
State
Highway

Improvement
project
by
Texas
Department
of
Transporta3on 










2,200,000
 7
Aus3n TX Water Thoroughbred
Farms
WWTP
improvements 












750,000
 7
Aus3n TX Water Odor
Control
Facility
for
Crosstown
Sewer
at
Walnut
Creek
WWTP
and
5
other
interceptor
sewer
loca3ons 










2,400,000
 8
Aus3n TX Water Reloca3on
of
1500
LF
of
16”
waterline
on
FM
2222
@
Bull
Creek‐to
accommodate
State
Highway
improvement

project 










2,700,000
 8
Aus3n TX Water South
Aus3n
Regional
Wastewater
Treatment
Plant
HVAC
Replacement 










1,800,000
 8
Aus3n TX Water Wastewater
Pipeline
Rehabilita3on
contract
for
Cured
In
Place
Pipeline
(CIPP)
Lining 










6,000,000
 8
Aus3n TX Water The
assessment
of
over
800
proper3es
that
may
have
abandoned
underground
storage
tanks
(UST). 












450,000
 9
Aus3n TX Water Water
Reclama3on
Ini3a3ve
Ph
1B
East
51st
Street
Transmission
Main 










1,800,000
 9
Aus3n TX Water ABIA
Extension
‐‐
approximately
8,000
feet
of
16”
reclaimed
water
main
to
serve
the
Aus3n‐Bergstrom

Interna3onal
Airport 










1,800,000
 10
Aus3n TX Water Central
Business
District
Alleys
–
Water
Lines. 










2,500,000
 10
Aus3n TX Water Co‐Genera3on
update
at
Hornsby
Bend
Sludge
Processing
Plant 










3,000,000
 10
Aus3n TX Water Dixie
Dr.
Erosion
Voluntary
Buyouts
(Demoli3on) 












740,000
 10
Aus3n TX Water Group
15:
Northwest
area
–
51st
St.,
Manor
Rd.,
Rogge
Ln.,
Basswood
Ln.
,
Exeter
Dr.,
Overbrook
Dr.,
Overdale

Rd.,
Trafalgar
Dr.,
Wight
Cv., 










3,443,535
 10
Aus3n TX Water Group
8:
Tarrytown
Neighborhood
–
Stamford
Ln.,
Forest
Trail,
Elton
Ln.,
Vista
Ln.,
Bremen
St.,
McCall
Rd.,

Woodmont
Ave.,
Grswold
Ln.
&
Westover
Rd 










3,390,235
 10
Aus3n TX Water ILA
with
Williamson
County
{Pond
Springs
Rd} 












500,000
 10
Aus3n TX Water Metric
Dam
Moderniza3on 












500,000
 10
Aus3n TX Water Rehabilita3on
of
Wastewater
Manholes
contract 










2,000,000
 10
Aus3n TX Water South
Aus3n
Regional
Wastewater
Treatment
Plant
‐
New
Roof
for
Secondary
Treatment
Building 










1,500,000
 10
Aus3n TX Water Storm
Drain
Improvements
[W.
22
½
at
Pearl
St.] 












300,000
 10
Aus3n TX Water Chaparral
Trail
/
Wykeham
Dr
Wastewater
Line
Improvements:

reroute
deteriorated
wastewater
lines
from

easements. 










2,387,000
 11
Aus3n TX Water Blunn
Creek
Water
Quality
Project 












420,000
 12
Aus3n TX Water Havana
Street
–
Storm
Drain
Improvements 












500,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Aus3n TX Water High
Point
Cove
Storm
Drain
Improvements 












750,000
 12
Aus3n TX Water Prince
Valiant
–
Storm
Drain
Improvements 












750,000
 12
Aus3n TX Water Replacement
of
exis3ng
Inoperable
Water
Valves
within
Aus3n’s
water
Distribu3on
system 










2,000,000
 12
Aus3n TX Water UNO
West
Campus
Areas
–
Water
Lines.

Exis3ng
water
lines
are
deteriorated
and
aged 










3,000,000
 12
Aus3n TX Water West
Bouldin
Creek
Integrated
Water
Quality
Project 












480,000
 12
Aus3n TX Water Wildhorse
Northeast
Interceptor
Sewer
Phase
2 










3,500,000
 12
Aus3n TX Water Willowbrook
and
Ohlen
Rd
Wastewater
Line
Rehabilita3on
Project:
replace
and
reroute
deteriorated

wastewater
lines. 










2,254,000
 12
Aus3n TX Water Reservoir
Improvements:
includes
rehabilita3on
of
two
of
the
City’s
exis3ng
water
reservoirs 










4,000,000
 13
Aus3n TX Water Upper
Waller
Wastewater
Line
Rehabilita3on
32nd
to
35th
/
Evans:

replace
deteriorated
wastewater
lines. 










2,500,000
 13
Aus3n TX Water Wildhorse
N
Interceptor
Extension
North
of
290 










4,000,000
 13
Aus3n TX Water Fort
Branch
Erosion
/Flood
Control
Voluntary
Buyouts
(Demoli3on) 












500,000
 14
Aus3n TX Water Onion
Creek
Soccer
Complex.

The
Onion
Creek
Soccer
Complex
includes
10
soccer
fields
and
5
addi3onal
acres

that
represent
25
total
acres
of
irrigated
area 










1,400,000
 14
Aus3n TX Water Water
and
wastewater
pipeline
reloca3ons
to
accommodate
City
of
Aus3n’s
Pleasant
Valley
Road
Bike
Route

project
to
add
10’
bike
and
pedestrian
route. 










1,000,000
 14
Aus3n TX Water Parkway
Project 












650,000
 15
Aus3n TX Water Parmer
Lane
Interceptor
Sewer
that
includes
approx
2,000
feet
of
42‐inch
Open
cut
and
Tunnel
Sewer 










3,000,000
 15
Aus3n TX Water Rio
Grande
from
MLK
to
29th 










8,000,000
 15
Aus3n TX Water Thaxton
Road
Culvert
Improvement 












760,000
 15
Aus3n TX Water Woodhollow
Dam
Pond
Maintenance 












830,000
 15
Aus3n TX Water Hancock
Golf
Course
Irriga3on
System
Improvements.

The
Hancock
Golf
Course
is
currently
irriga3ng
30
acres

of
turf
grass
with
potable
water.

This
project
will
provide
a
new
irriga3on
system
u3lizing
reclaimed
water. 










1,300,000
 16
Aus3n TX Water Williamson
Creek
IH35
&
Ben
White
WQ
pond,
Ph.
2 












610,000
 16
Aus3n TX Water Crosstown
Wastewater
Line
Rehabilita3on:
replace
and
reroute
deteriorated
wastewater
lines. 










3,614,000
 18
Aus3n TX Water Hornsby
Bend
Biosolids
Facility
Digester
Cleaning
and
Rehabilita3on 








20,000,000
 18
Aus3n TX Water Bannockburn
Storm
Drain
Improvements 










1,600,000
 20
Aus3n TX Water Davis
Bldg
Roof
Replacements 










2,300,000
 20
Aus3n TX Water Great
Northern
Dam
Moderniza3on 










1,300,000
 20
Aus3n TX Water Intersec3on/Safety
Improvement
Projects
(various
loca3ons) 










1,500,000
 20
Aus3n TX Water Lakewood
Drive
Low
Water
Crossing
Upgrade 












950,000
 20
Aus3n TX Water Long
Bow
Storm
Drain
Improvements 










3,600,000
 20
Aus3n TX Water Oak
Lawn
Storm
Drain 










1,800,000
 20
Aus3n TX Water Re3red
Lib
sta3on,
Pump
Sta3on
and
Reservoir
Facility
Decommissioning 










5,000,000
 20
Aus3n TX Water Spicewood
Springs
Pump
Sta3on
Improvements 










8,200,000
 20
Aus3n TX Water Standby
Generators
for
Wastewater
Lib
Sta3ons 










3,500,000
 20
Aus3n TX Water Pfluger
Bicycle
&
Pedestrian
Bridge
Extension 










2,300,000
 21
Aus3n TX Water Shaw
Lane
Site
Drainage
and
Levee
Improvements
to
contain
100‐year
storm 










2,500,000
 21
aus3n TX Water Bicycle
Infrastructure
Improvements:
a
package
of
ready‐to‐install
bike
lanes,
shared‐use
bicycle
and

pedestrian
paths,
and
minor
infrastructure
improvements
to
remove
barriers
on
bike
routes.

 










2,600,000
 24
Aus3n TX Water Blunn‐Warehouse
Row
Water
Quality
(WQ)
Pond 












850,000
 24
Aus3n TX Water Lundelius‐McDaniel
Water
Quality
Pond 












900,000
 24
Aus3n TX Water Vista
Ln
Wastewater
Line
Rehabilita3on
Project;

Replace
wastewater
lines
in
coordina3on
with
street

reconstruc3on
project. 










4,822,000
 24
Aus3n TX Water Athle3c
Field
Irriga3on
System
Improvements.

The
Parks
and
Recrea3on
Department
operates
youth
athle3c

fields
throughout
the
City
of
Aus3n. 










2,300,000
 25
Aus3n TX Water CBD
Alley
Improvements 










3,000,000
 25
Aus3n TX Water Hornsby
Bend
Biosolids
Facility
Sustainability
project
to
rehabilitate
numerous
components
of
the
plant 










5,000,000
 25
Aus3n TX Water W.23rd
Street
Streetscape
and
Stormwater
Improvements 










2,000,000
 25
Aus3n TX Water Waters
Park
Interceptor
Sewer
that
includes
replacement
of
approximately
6,000
feet
of
undersized
sewer
with

42‐inch
sewer 










5,000,000
 26
Aus3n TX Water Lifle
Walnut
and
Upper
Ft
Branch
Wastewater
Line
Rehabilita3on:
replace
deteriorated
wastewater
lines. 










5,395,000
 27
Aus3n TX Water AFD
Firehouse
Improvement
Project:
to
include
sidewalk,
ADA
ramps,
mul3gender
facility
conversion,

moderniza3on 










7,000,000
 30
Aus3n TX Water The
Trail
Enhancement
Plan
at
Lady
Bird
Lake. 










7,000,000
 30
Aus3n TX Water WPDR
O&M
Maintenance
Facility
[Green
Design] 










1,800,000
 30
Aus3n TX Water Bicycle
and
Pedestrian
Tunnel
(Bowie
Street
Underpass) 










3,500,000
 32
Aus3n TX Water Hoeke
Lane
Low
Water
Crossing
Upgrade 










2,300,000
 32
Aus3n TX Water Rehabilita3on
of
Primary
and
Final
Clarifiers
and
Sludge
Thickeners
at
the
South
Area
Regional
(SAR)
WWTP 








10,000,000
 32
Aus3n TX Water 32nd
St
Street
Reconstruc3on/U3lity
Upgrade
Project 










1,275,000
 35
Aus3n TX Water Group
1
Phase
2
Street
Reconstruc3on
and
U3lity
Adjustment
Project 










1,741,966
 37
Aus3n TX Water Group
6
Street
Reconstruc3on
Project 










2,086,000
 37
Aus3n TX Water Brodie
Lane
Sidewalk
Project
–
Sidewalk
on
both
sides
of
Brodie
Ln.
from
Travis
County
line
north
to
Slaughter 










1,500,000
 40
Aus3n TX Water Group
3
Northeast
Aus3n
Street
Reconstruc3on/U3lity
Upgrade
Project 










3,575,000
 40
Aus3n TX Water Roy
G.
Guerrero
Colorado
River
Park 










4,000,000
 40
Aus3n TX Water Wastewater
Pipeline
Rehabilita3on,
Relay
and
Spot
Repair
Services
Contract 










8,000,000
 40
Aus3n TX Water Rio
Grande
Street
Reconstruc3on
and
U3lity
Adjustment
Project,
MLK,
Jr.
to
W.
24th
St. 










5,500,000
 42
Aus3n TX Water Second
Street
Road
Reconstruc3on
Project 










7,500,000
 44
Aus3n TX Water Water
Reclama3on
Ini3a3ve
–
Red
River
to
UT
Transmission
Main
‐‐
approximately
21,000
feet
of
reclaimed

water
main 








13,300,000
 45
Aus3n TX Water Group
4
Southeast
Aus3n
Street
Reconstruc3on/U3lity
Upgrade
Project 










6,175,000
 47
Aus3n TX Water Todd
Lane
Roadway
Improvements 










2,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Aus3n TX Water E.
7th
Street
Corridor
Project
(from
Pleasant
Valley
to
Pedernales
St)
to
include
street
reconstruc3on
and

drainage/u3lity
upgrades,
streetscape
ameni3es
(sidewalk,
landscaping,
ligh3ng),
and
ADA
improvements. 










8,120,000
 54
aus3n TX Water Boardwalk
along
Lady
Bird
Lake:

The
project
will
close
a
1.3‐mile
gap
in
a
heavily
used
pedestrian
and
bicycle

trail
system.
The
trail
extension
will
improve
safety
and
provide
addi3onal
access
to
a
major
bike
and

pedestrian
corridor
for
the
expanding
m 








18,000,000
 60
Aus3n TX Water Pleasant
Valley
Road
Extension 










2,500,000
 60
Aus3n TX Water Wells
Branch
Roadway
Project 










2,000,000
 60
Aus3n TX Water Westgate
Blvd
from
Cameron
Loop
to
Cohoba
Dr. 










2,000,000
 65
Aus3n TX Water Morris
Williams
Golf
Course
Renova3on: 










4,000,000
 70
Aus3n TX Water ADA
Title
II
Handicap
Facili3es‐Compliant
Upgrades 










5,000,000
 75
Aus3n TX Water Davis/Deer
Ln.
from
Brodie
Ln.
to
Corran
Ferry 










1,000,000
 75
Aus3n TX Water Bicycle,
Shared
Path,
Connected
Trails,
and
Sidewalk
Projects 










2,500,000
 90
Aus3n TX Water William
Cannon
New
Sidewalk,
IH‐35
to
Pleasant
Valley
Rd 










3,000,000
 110
Aus3n TX Water S.
1st
Street
Sidewalk
Project 










5,000,000
 125
Aus3n TX Water Brazos
St,
U3lity
and
Road
Reconstruc3on 










9,700,000
 150
Aus3n TX Water North
Lamar
Sidewalk
Project
–
Sidewalk
on
both
sides
of
N.
Lamar
from
Rundberg
Ln.
north
to
Braker
Ln.
providing
a
high
priority
ADA

accessible
route 










6,500,000
 180
Aus3n TX Water Rosedale
Storm
Drain
Improvements,
Phase
1 










8,600,000
 244
Aus3n TX Water Burnet
Rd.
Sidewalk
Project
–
Sidewalk
on
both
sides
of
Burnet
Rd
from
Koenig/Allendale
north
to
US
183 








10,000,000
 250
Aus3n TX Water E.
4th
Street
Storm
Drain
Improvements 










9,000,000
 256
Aus3n TX Water The
Waller
Creek
Tunnel
(WCT)
Project 






127,500,000
 1836
Baytown TX CDBG Replace
an
exis3ng
fire
engine
with
more
modern,
safe
and
efficient
equipment 












600,000
 0
Baytown TX CDBG Conduct
a
construc3on
program
to
replace
leaking
sewer
service
lines
to
eliminate
the
inflow
and
infiltra3on

that
results
in
sewer
overflows,
loss
of
service
and
damage
to
private
property. 












375,000
 20
Baytown TX CDBG Construc3on
of
sidewalks
in
the
CDBG
target
area
to
link
neighborhoods
with
schools,
parks
and
shopping

facili3es. 










2,500,000
 25
Baytown TX CDBG Provide
hardening
modifica3ons
to
protect
cri3cal
public
safety
facili3es
in
the
event
of
hurricane
or
other

severe
weather. 












600,000
 25
Baytown TX CDBG Repair/replacement
of
the
wastewater
collec3on
system
in
the
Central
Heights
subdivision
to
eliminate
loss‐of‐
service
and
wastewater
overflows
in
the
CDBG
target
area. 










1,250,000
 25
Baytown TX CDBG Replacement
of
20,000
linear
feet
of
2"
water
line
with
6"
and
8"
lines
to
improve
life
safety,
fire
protec3on,

and
water
service
to
a
CDBG
target
area
neighborhood. 










1,700,000
 35
Baytown TX CDBG Construc3on
of
an
addi3onal
wastewater
lib
sta3on
to
support
economic
development
and
redevelopment
in

this
under‐served
CDBG
target
area. 










1,250,000
 45
Baytown TX CDBG Repairs
and
improvements
to
the
Central
Police
Headquarters
Building 










1,000,000
 45
Baytown TX CDBG Construct
a
Police
driving
training
course
on
property
currently
owned
by
the
local
school
district.
This

partnership
program
would
provide
state‐of‐the‐art,
hands‐on
training
for
police
agencies
from
a
large

geographic
area.
Befer
trained
police
officer 










2,600,000
 50
Baytown TX CDBG Funding
for
the
Downtown/Texas
Avenue
revitaliza3on
through
the
expansion
of
the
Streetscape
Project
to

addi3onal
blocks.

The
City
has
received
approximately
$800,000
in
a
federal
grant
to
reconstruct
one
block
of

Texas
Avenue
and
the
grant
is
matched
 










3,000,000
 55
Baytown TX CDBG Expansion
of
Baytown
City
Hall
in
a
CDBG
target
area
to
support
and
s3mulate
redevelopment
in
the
area

rather
than
reloca3ng
to
the
"new"
part
of
town. 










3,500,000
 65
Baytown TX CDBG Rehabilita3on
and
expansion
of
the
local
Emergency
Medical
Service
facility
to
meet
health
and
safety
codes

and
to
provide
a
more
produc3ve
work
environment. 










1,000,000
 65
Baytown TX CDBG Construct,
staff
and
equip
a
new
fire
sta3on
in
an
underserved,
outlying
area,
improving
life
safety
and

poten3ally
reducing
fire
insurance
costs. 










3,000,000
 85
Baytown TX CDBG Reconstruc3on
of
the
Bayland
Marina
that
was
destroyed
by
Hurricane
Ike.
This
public
marina
is
located
in
a

CDBG
target
area
and
is
a
key
to
economic
s3mulus
and
redevelopment
of
the
area. 










3,850,000
 100
Baytown TX CDBG Complete
a
Base‐Restore
and
Overlay
program
for
substandard
streets
in
the
CDBG
target
area.

This
would

encompass
61
miles
of
deteriorated
streets
and
serve
as
a
great
redevelopment
and
image
improvement

program
for
this
community. 








22,600,000
 150
Baytown TX CDBG Replacement
of
sanitary
sewer
service
lines
to
residences
in
the
CDBG
target
area
to
enhance
service
delivery,

improve
health
and
sanita3on
and
to
avoid
the
costly
expansion
of
wastewater
treatment
facili3es
to
treat
the

inflow
of
rainwater. 








20,000,000
 250
Baytown TX Public
Safety Add
a
graffi3
abatement
team
to
curb
this
illegal
ac3vity
in
the
economically‐depressed
areas
of
our
city 












250,000
 4
Baytown TX Public
Safety Retrofit
to
the
exis3ng
Police
Academy
to
harden
the
structure
to
Category
Four
Hurricane
resistance. 












750,000
 30
Baytown TX Public
Safety Lead
remedia3on
and
environmental
upgrade
of
the
range
which
would
include
a
bullet
trap
and
baffle
system

that
would
greatly
reduce
if
not
eliminate
future
remedia3on
necessity. 










4,000,000
 40
Baytown TX Public
Safety Construct
a
hardened
Emergency
Opera3ng
Center
Support
facility
to
provide
a
safe
and
reszul
environment

for
sheltered
public
safety
personnel
during
extended
incidents
such
as
hurricanes 










3,500,000
 125
Baytown TX Public
Safety Construc3on
of
a
redundant
fiber
op3cs
ring
and
regional
connec3vity
to
provide
cri3cal
public
safety

communica3ons
infrastructure
during
natural
or
manmade
disasters. 










7,400,000
 175
Baytown TX Schools Provide
public
shelter
mi3ga3on
renova3on
for
four
local
schools
to
provide
increased
resistance
to
damage

and
the
emergency
use
as
employee
and
public
shelters.
This
includes
generators,
rated
window
protec3on

and
roof
hardening.

Many
of
the
improve 










8,000,000
 275
Baytown TX Streets/Roads Widening
and
redesign
of
the
Garth
Road
and
Baker
Road
area
to
reduce
conges3on
and
improve
air
quality 










5,000,000
 85
Baytown TX Streets/Roads Widen
and
reconstruct
Cedar
Bayou
Lynchburg
Road
from
John
Mar3n
to
Barkuloo
Road
to
reduce
conges3on

and
improve
this
cri3cal
east‐west
thoroughfare. 










6,000,000
 150
Baytown TX Streets/Roads Construc3on
of
a
freeway
"flyover"
connector
on
an
essen3al
hurricane
evacua3on
route
to
eliminate
three

pinch
points.
This
will
connect
Highway
146
South
to
Sup
330
North,
a
state‐mandated
evacua3on
route
for

Harris
and
Chambers
Coun3es. 








12,000,000
 175
Baytown TX Streets/Roads Realignment
and
Reconstruc3on
of
FM
565
in
western
Chambers
County
to
reduce
traffic
conges3on
on
Hwy.

146
and
to
s3mulate
development
along
the
new
roadway. 








12,000,000
 175
Baytown TX Streets/Roads Construc3on
of
extension
of
East
Baker
Road
to
improve
public
safety
service
delivery
and
traffic
circula3on,

provide
an
addi3on
east‐west
thoroughfare
and
spur
economic
development. 










7,500,000
 200
City State Program Project
Descrip3on Funding
Required Jobs
Baytown TX Streets/Roads Widen
and
reconstruc3on
N.
Main
Street
and
Wallisville
Road
in
the
vicinity
of
the
Goose
Creek
High
School
to

improve
safety,
reduce
conges3on
and
create
economic
development
incen3ves
for
the
largely
rural
area. 








12,000,000
 200
Baytown TX Streets/Roads Complete
a
Base‐Restore
and
Overlay
program
for
substandard
streets
citywide.
(85
miles
of
roadway) 








31,600,000
 250
Baytown TX Streets/Roads Realignment
and
reconstruc3on
of
John
Mar3n
Road
to
reduce
traffic
conges3on
and
spur
economic

development
in
this
depressed
area. 








14,000,000
 250
Baytown TX Water Installa3on
of
an
emergency
generator
for
the
East
District
Wastewater
Treatment
Plant
to
provide
the

capability
to
treat
wastewater
effluent
during
emergencies.
This
will
avoid
the
discharge
of
untreated
effluent

into
coastal
waterways 










1,000,000
 15
Baytown TX Water Modifying
12
large
lib
sta3ons
to
provide
emergency
power
supplies
to
avoid
the
discharge
of
untreated

effluent
during
emergencies. 










6,000,000
 35
Baytown TX Water Rehabilita3on
and
repair
of
the
Goose
Creek
Wastewater
trunk
line
to
eliminate
wastewater
overflows
and

improve
service
delivery. 










4,500,000
 35
Baytown TX Water Reconstruc3on
of
the
Raccoon
Lib
Sta3on
to
eliminate
the
wastewater
overflows
that
result
for
inflow
and

infiltra3on
and
the
deteriorated
condi3on
of
the
facility. 










3,000,000
 40
Baytown TX Water Reloca3on
and
reconstruc3on
of
the
Gulf
Coast
Lib
Sta3on
and
Force
Main
to
elevate
it
out
of
the
flood
plain

and
eliminate
the
wastewater
overflows
that
result
for
inflow
and
infiltra3on
and
the
deteriorated
condi3on
of

the
facility. 










1,500,000
 45
Baytown TX Water Replacement
and
upsizing
of
the
Alexander
Trunkline
to
eliminate
sewer
overflows,
improve
service
delivery

and
provide
capacity
for
economic
development
and
expansion. 










8,000,000
 50
Baytown TX Water Construc3on
of
a
1
million
gallon
elevated
storage
tank
to
improve
fire
protec3on
water
supplies
and
to
serve

addi3onal
areas
to
support
economic
development. 










2,600,000
 65
Baytown TX Water Reconstruc3on
of
the
Steinman
Lib
Sta3on
and
Force
Main
to
eliminate
the
wastewater
overflows
that
result

for
inflow
and
infiltra3on
and
the
deteriorated
condi3on
of
the
facility. 










6,000,000
 85
Baytown TX Water Rehabilita3on
of
the
Baytown
Area
Surface
Water
Treatment
facility
for
energy
and
produc3on
efficiency
and

to
provide
back‐up
power
capabili3es
to
provide
potable
water
during
post‐disaster
emergencies
such
as

Hurricane
Ike. 








10,000,000
 85
Baytown TX Water Rehabilitate
the
Central
District
Wastewater
Treatment
facility
to
improve
treatment
efficiencies,
reduce

wastewater
overflows
and
improve
the
energy
efficiency.
Project
includes
replacement
of
the
influent
lib

sta3on
and
piping,
eleva3ng
the
administr 










8,300,000
 120
Baytown TX Water Construct
a
sanitary
sewer
force
main
and
lib
sta3on
to
extend
wastewater
u3li3es
into
an
unserved
area
to

facilitate
economic
development
and
job
crea3on
in
the
residen3al,
commercial,
retail,
manufacturing
and

industrial
sectors. 










9,800,000
 175
Baytown TX Water Construc3on
of
a
Baytown
Area
Water
Authority
transmission
line
to
and
along
Interstate
Highway
10
to

facilitate
improved
public
safety
and
to
spur
economic
development
in
east
Harris
County
and
West
Chambers

County. 








21,750,000
 225
Beaumont TX Amtrak Beaumont
Amtrak
Stop 












750,000
 8
Beaumont TX CDBG Reinvestment
Zone
Housing 










5,000,000
 50
Beaumont TX Energy Landfill
Hydrogen
Project 










5,000,000
 50
Beaumont TX Public
Safety Public
Safety
Headquarters
Parking
Lot
Expansion
to
decrease
response
3me. 












272,000
 15
Beaumont TX Transit Bus
Stops
Rehab 










1,000,000
 10
Bedford TX CDBG Expansion
of
linear
trails 












350,000
 7
Bedford TX CDBG Records
Management
System 












400,000
 8
Bedford TX CDBG Equipment
Replacement
and
improvements
@
various
parks 












940,000
 10
Bedford TX CDBG ADA
Ramps
in
various
loca3ons 












600,000
 12
Bedford TX CDBG Boys
Ranch
Park
Lake
Reclama3on 










1,500,000
 18
Bedford TX Public
Safety Animal
Control
Center
Expansion 












300,000
 10
Bedford TX Public
Safety Police
&
Fire
Radio
System
Upgrade 












700,000
 11
Bedford TX Schools New
Library
Building 










8,000,000
 80
Bedford TX Streets/Roads Upgrade
School
Zone
Flashers 












130,000
 5
Bedford TX Streets/Roads Install
Video
Detec3on. 












660,000
 10
Bedford TX Streets/Roads Signal
Synchroniza3on
and
bafery
backup 












560,000
 11
Bedford TX Streets/Roads Crack
Sealing
on
various
streets 










1,100,000
 12
Bedford TX Streets/Roads Rebuild
Woodland
Terrace
and
Cindy
Lane 












300,000
 12
Bedford TX Streets/Roads Rebuild
Ravenswood
Drive
and
King
Drive 












800,000
 15
Bedford TX Streets/Roads Repair
and
Refurbish
Traffic
Control
Signals 










1,300,000
 15
Bedford TX Streets/Roads Barr
Road
Improvements 












400,000
 18
Bedford TX Streets/Roads Safe
Routes
to
School
Sidewalk
Installa3on 










1,600,000
 20
Bedford TX Water Median
Irriga3on
Systems
Controller
Conversion 












350,000
 7
Bedford TX Water Install
3,000
feet
of
12"
sanitary
sewer
main
in
SB‐1
north
of
SH
183. 












300,000
 8
Bedford TX Water Install
3,300
feet
of
10"
and
15"
sanitary
sewer
mains
along
Brookside
Drive
from
Cummings
Road
to
Cheek

Sparger
Road
 












400,000
 8
Bedford TX Water Installa3on
of
two
sanitary
sewer
metering
sta3ons
on
Hurst‐Bedford
connec3ons 












300,000
 8
Bedford TX Water Repair
sanitary
sewer
line
creek
crossings
in
various
loca3ons. 












400,000
 8
Bedford TX Water Install
1,600
feet
of
18"
sanitary
sewer
main
along
Hurricane
Creek
@
L.
Don
Dodson
Drive. 












220,000
 10
Bedford TX Water Replace
12"
water
main
in
Commerce
Place
from
Reliant
Parkway
to
Forum
Drive. 












250,000
 10
Bedford TX Water Replace
water
mains
on
Red
Oak
Lane/Scenic
Hills
and
Stonegate
North
Addi3ons. 












375,000
 10
Bedford TX Water Replace
water
mains
on
Russell
Drive
and
Ravenswood
Drive 












370,000
 10
Bedford TX Water Erosion
Control
projects
@
various
loca3ons 












800,000
 12
Bedford TX Water Replace
12"
water
main
in
Mar3n
Drive 












500,000
 12
Bedford TX Water Replace
sanitary
sewer
mains
in
various
loca3ons. 










1,200,000
 12
Bedford TX Water Replace
water
mains
in
the
Gefsburg
Place
and
Noqngham
Addi3ons. 












600,000
 12
Bedford TX Water Replace
water
mains
in
the
Shady
Brook
Addi3on
 












950,000
 13
Bedford TX Water Automated
Meter
Reading
System
Conversion 










3,250,000
 15
Bedford TX Water Schumac
Lane/Monterrey
Storm
Drain
Improvements 










1,600,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Bedford TX Water Rehab
sanitary
sewer
mains
in
the
Shady
Brook
Addi3on
and
the
ouzall
main
along
Suphur
Branch
from

Harwood
Road
to
Pipeline
Road. 










2,800,000
 17
Bedford TX Water Rehab
sanitary
sewer
mains
in
the
Harwood
Terrace,
Rollingwood,
Bell
Hurst,
Oakwood
Park
East
and
Bell

Manor
Addi3ons. 










1,800,000
 21
Bedford TX Water Culvert
Improvements
to
pass
the
100
Year
Flood
on
Sulphur
Branch
and
SB‐1
@
Schumac
Lane,
Donna
Lane,

Briar
Drive,
Shirley
Way

and
Circle
Lane. 










2,000,000
 22
Bedford TX Water Channel
Improvements
and
Historical
Bridge
Reloca3on
on
Sulphur
Branch. 










1,100,000
 28
Blue
Mound TX Public
Safety Police
Department
Building
Community
Rela3ons
Officer 










2,500,000
 51
Blue
Mound TX Water Purchase
local
privately
owned
water
u3li3es
system
and
update
water
infrastructure.
Current
fire
hydrants
are

not
in
compliance. 










4,000,000
 35
Brownsville TX CDBG Gynasium
in
a
low
income
area. 










3,000,000
 50
Brownsville TX CDBG Sec3on
108
Loan
for
street
reconsturc3on 










4,000,000
 120
Brownsville TX Water Wier‐Dam:

This
project
will
hold
water
from
the
Rio
Grande
River
that
will
be
used
for
drinking
by
the
city
of

Brownsville
and
will
raise
the
water
level
of
the
river
that
will
serve
as
a
deterent
for
illegal
drug
traffic
crossing

the
border.

The
raised 








58,000,000
 250
Bryan TX Water 5
million
and
1
million
gallon
ground
storage
tank 










4,000,000

Bryan TX Water Burton
Creek
Wastewater
Treatment
Plant 








13,000,000

Bryan TX Water Hwy
21
waterline
extension 










1,500,000

Bryan TX Water Hwy
47
waterline
extension 










1,500,000

Bryan TX Water S3llcreek
Sewer
Phase
3 










6,500,000

Bryan TX Water Thompson's
Creek
Wastewater
Treatment
Plant 








13,000,000

Bryan TX Water Well
19
collec3on
line 










1,500,000

Bryan TX Water Westside
Interceptor 










5,500,000

Carrollton TX Streets/Roads Whitlock
Road
Reconstruc3on 










5,000,000
 1000
Carrollton TX Water Emergency
Water
Pumps 










3,000,000
 1000
Carrolton TX CDBG Park
Place
Reconstruc3on 










6,000,000
 1000
Clarksville TX CDBG Civic
center,
shelter,
upgrade
to
water
and
wastewater
facili3es,
and
upgrade
of
downtown
commercial
district









12,000,000

Clarksville TX Schools Moderniza3on
of
the
High
school,
middle
school
and
elementary
schools 








50,000,000

Clarksville TX Streets/Roads Overlay
and
reconstruct
city
streets 








10,000,000

Clarksville TX Water Address
inflow
and
infiltra3on
concerns,
replace
all
an3quated
lines,source
protec3on
at
water
plant
and
lake,

looping
system
in
south
part
of
town,
addi3onal
water
tower,
and
expansion
of
lake 








35,000,000

College
Sta3on TX CDBG Holleman
U3lity‐Line
Burying 










2,000,000
 25
College
Sta3on TX CDBG Northgate
Park 










4,200,000
 31.5
College
Sta3on TX CDBG Affordable
Housing
Development 










8,000,000
 40
College
Sta3on TX CDBG Holleman
Mixed‐Use
Development 










4,000,000
 50
College
Sta3on TX CDBG Community
Center 










7,000,000
 120
College
Sta3on TX Streets/Roads Tauber/Stasney
Roadway
Improvements 










2,000,000
 6
College
Sta3on TX Streets/Roads Northgate
Pedestrian
Improvements 










9,000,000
 25
Dallas TX Airport ARFF
Vehicle
Replacement 










1,000,000
 2
Dallas TX Airport Design
for
taxiway
A
&
B
reconstruc3on 














45,000
 2
Dallas TX Airport Airfield
Ligh3ng
Vault
Replacement:
Construc3on
of
north
&
west
vaults 










2,400,000
 24
Dallas TX Airport Construc3on
of
Taxiway
L
extension
&
repair 










4,400,000
 44
Dallas TX Airport Apron
&
Fuel
Hydrant
System
Replacement:
Design
of
concrete
apron
&
fuel
hydrant
system
for
new
terminal

building
to
be
constructed
in
four
phases 










5,500,000
 55
Dallas TX Amtrak Drainage
reconstruc3on
&
sidewalk
construc3on
along
UP
Railroad
at
Beckley 










1,100,000
 11
Dallas TX CDBG IH‐20
Gateway
Park 












500,000
 5
Dallas TX CDBG Bernal
Trail
Extension 










2,500,000
 25
Dallas TX CDBG Marsalis
Avenue
sidewalk
replacement
and
pedestrian
improvements 












250,000
 25
Dallas TX CDBG New
sidewalks,
curbs,
etc. 










3,000,000
 30
Dallas TX CDBG Energy
efficency
&
conserva3on 










3,640,000
 36
Dallas TX CDBG Con3nental
Avenue
modifica3on
to
pedestrian
bridge 








10,000,000
 100
Dallas TX CDBG Trinity
Trails
Phases
2,3,4 








16,000,000
 160
Dallas TX CDBG Construc3on
of
Conven3on
Center
Hotel 






386,000,000
 3800
Dallas TX Energy Equipment,
supplies
and
tree
stock
for
Great
Trinity
Forest
tree
plan3ng
(includes
site
prepara3on) 












500,000
 5
Dallas TX Energy Installa3on
of
Solar
Panels
on
city,
school
district
bldgs.,
on
streetlights,
traffic
signals 












500,000
 27.5
Dallas TX Energy Installa3on
of
geothermal
heat
pumps
at
the
proposed
site
of
the
Texas
Horse
Park 












150,000
 30
Dallas TX Energy Replacement
of
lamps
in
City‐owned
parking
lots
with
energy
efficient
LED
lights 












700,000
 37.5
Dallas TX Energy Underhanging
of
138kV
Transmission
Lines
along
Irving
Boulevard 










4,000,000
 40
Dallas TX Energy La3no
Cultural
Center
‐
Phase
II
design
and
construc3on 








18,000,000
 180
Dallas TX Energy West
Dallas
Revitaliza3on
Project:
Work
with
low‐income
neighborhoods
to
weatherize
houses
and
retrofit

them
with
energy
efficient
technology,
equipment,
systems
and
apppliances.
A
green
collar
jobs
element
will

train
residents
to
retrofit
such
houses 












900,000
 250
Dallas TX Energy Library
Energy
Efficiency
Upgrades 








42,000,000
 420
Dallas TX Energy Fire
Sta3on
#6
Energy
Efficiency
Replacements
&
Upgrades 








52,000,000
 520
Dallas TX Energy Police
Academy
Construc3on 








62,000,000
 620
Dallas TX Housing ADA
entrance
upgrades
at
all
sites 












105,000
 1
Dallas TX Housing Exterior
repairs
at
at
Lifle
Mexico
Village 












150,000
 1
Dallas TX Housing Clean
lagoon
at
Lakewest
Site 












200,000
 2
Dallas TX Housing Replace
roofs
at
Brooks
Manor 












250,000
 3
Dallas TX Housing Replace
roofs
at
Cliff
Manor 












250,000
 3
City State Program Project
Descrip3on Funding
Required Jobs
Dallas TX Housing Remodel
kitchens
at
scafered
sites 












400,000
 4
Dallas TX Housing Replace
elevators
at
Brooks
Manor 












240,000
 4
Dallas TX Housing Exterior
repairs
at
Hidden
Ridge 












500,000
 5
Dallas TX Housing Replace
roofs
at
Cedar
Springs 












900,000
 9
Dallas TX Housing Concrete
work
at
all
sites 










2,000,002
 20
Dallas TX Housing Demoli3on
of
Turner
Courts
&
Rhoads
Terrace 










2,450,000
 25
Dallas TX Housing Construct
55
dwelling
units
at
Roseland
Homes 










6,100,000
 61
Dallas TX Public
Safety Hire
20
new
police
officers 










1,500,000
 20
Dallas TX Public
Safety Upgrade
the
City
of
Dallas
public
safety
radio
system
to
the
800
Mhz
digital
spectrum,
providing
City
of
Dallas

first
responder
with
full
regional
interoperability 








40,000,000
 30
Dallas TX Streets/Roads Irving
Boulevard/Mockingbid
Lane
Inersec3on
Improvement
Project:
add
dual
leb‐turn
and
right‐turn
lanes
on

all
approaches 










1,240,000
 10
Dallas TX Streets/Roads East
Dallas
Veloway
Phase
I:
build
a
2‐mile
mul3‐use
trail
that
will
create
a
19‐mile
con3nuous
trail
connec3ng

East
Dallas
neighborhoods
with
two
DART
light
rail
sta3ons,
employment
centers,
schools,
retail
centers
and

recrea3onal
facili3es 










2,257,920
 18
Dallas TX Streets/Roads Katy
Trail
Phase
IV:
build
a
2.5‐mile
mul3‐use
trail
from
Skillman
Street
to
the
Northwest
Highway
DART
Light

Rail
Sta3on 










2,257,920
 18
Dallas TX Streets/Roads Industrial
Boulevard
reconstruc3on
from
Con3nental
Avenue
to
RR 










5,200,000
 52
Dallas TX Streets/Roads Sign
replacement
program
‐
regulatory
and
warning.

100,000
signs
city‐wide. 










8,250,000
 83
Dallas TX Streets/Roads Bafery
Back
up
for
traffic
signals
city‐wide 










9,000,000
 90
Dallas TX Streets/Roads Chalk
Hill
Road
Reconstruc3on 










9,100,000
 90
Dallas TX Streets/Roads Replace
structurally
deficient
traffic
signal
poles 










8,800,000
 90
Dallas TX Streets/Roads Linfield
Road
Pedestrian
Bridge 








10,000,000
 100
Dallas TX Streets/Roads Sylvan
Avenue
bridge
reconstruc3on 








19,700,000
 197
Dallas TX Streets/Roads Pedestrian
Bridge
over
UP
Railroad
at
Cadiz
Street 








20,000,000
 200
Dallas TX Streets/Roads Streetlights
on
freeways
without
exis3ng
ligh3ng 








24,398,000
 250
Dallas TX Streets/Roads Upgrade
communica3on
system
for
centralized
traffic
control
system 








33,000,000
 330
Dallas TX Streets/Roads Margaret
McDermof
(IH‐30)
Bridge
Reconstruc3on 






246,540,000
 2465
Dallas TX Water Cullum
Street
(Waterview
to
Coit) 












750,000
 8
Dallas TX Water 48‐inch
DFW
line
tunneling 










2,000,000
 20
Dallas TX Water 54‐inch
wastewater
interceptor
Turtle
Creek
from
Maple
to
Cedar
Springs 










2,200,000
 22
Dallas TX Water Southside
Plant
‐
DLD
Field
Regrading 










3,000,000
 30
Dallas TX Water Water
&
wastewater
main
replacement
construc3on
(HZ)(LB)
‐
25,000
lf
of
pipeline
replacements 










4,800,000
 32
Dallas TX Water McKamy,
Cofonwood
&
central
Branch
Phase
I 










6,000,000
 60
Dallas TX Water Water
&
wastewater
main
replacement
(Phase
II)
(Dal‐Tec)
(EV)
‐
30,000
lf
of
pipeline
replacement 










6,000,000
 60
Dallas TX Water Appian
&
Central
Low
Construc3on
Phase
I
(AP) 










6,500,000
 65
Dallas TX Water Ferris
Branch
Replacement
Construc3on
Phase
II
‐
24,000
lf
of
pipeline
replacement 










6,700,000
 67
Dallas TX Water SW
Pipeline
(Wintergreen
Raod
from
I‐35
to
Houston
School
Road) 








18,000,000
 180
Dallas TX Water Water
&
wastewater
Replacement
(In‐house) 








20,000,000
 200
Dallas TX Water Tawakoni
Balancing
Reservoir
Expansion 








30,000,000
 300
Dallas TX Water Lake
Tawakoni
144‐inch
raw
water
pipeline
Phase
I 








45,000,000
 450
Del
Rio TX Airport Airport
Design 












500,000
 3
Del
Rio TX Airport Hanger
Project 












500,000
 10
Del
Rio TX Airport Airport
Terminal
Expansion 










2,000,000
 15
Del
Rio TX Amtrak Rail
Spur 










8,000,000
 10
Del
Rio TX Amtrak Sta3on
Upgrade 










2,000,000
 10
Del
Rio TX CDBG Wastewater
Ouzall
Line 










1,000,000
 8
Del
Rio TX CDBG Recycle
Drop
Off
Sta3on 










3,500,000
 10
Del
Rio TX CDBG Animal
Control
Building 










1,500,000
 12
Del
Rio TX CDBG Ave
E
&
G
Infrastructure 










2,000,000
 12
Del
Rio TX CDBG City
Paving
Plan
Upgrades/Repair 










2,000,000
 12
Del
Rio TX CDBG Main
Street
Infrastructure 










2,000,000
 12
Del
Rio TX CDBG Sports
Complex 










3,000,000
 18
Del
Rio TX CDBG City
Building
Repairs 










4,000,000
 20
Del
Rio TX CDBG Dodson
Paving
Project 










1,000,000
 20
Del
Rio TX CDBG Fire
Department
Admin
Building 










1,000,000
 20
Del
Rio TX CDBG Interna3onal
Bridge
Toll
Plaza 










3,000,000
 20
Del
Rio TX CDBG City
Hall
Design/Build 










8,000,000
 30
Del
Rio TX CDBG Qualia
Loop
Relief
Route 










5,000,000
 30
Del
Rio TX Energy Energy
Distribu3on
Center 










2,000,000
 20
Del
Rio TX Energy City
Green
Project 










5,000,000
 30
Del
Rio TX Housing Public
Housing
Addi3on 










2,000,000

Del
Rio TX Housing Upgrade
Public
Housing 










5,000,000

Del
Rio TX Public
Safety Police
Equipment
Upgrade 










1,000,000
 10
Del
Rio TX Public
Safety Technology
Upgrade 










1,000,000
 10
Del
Rio TX Schools Sports
Complex 










2,000,000
 20
Del
Rio TX Schools High
School
Green
Design 










4,000,000
 25
Del
Rio TX Schools SFCISD
Technology
Program 










5,000,000
 30
Del
Rio TX Streets/Roads Frontera
Road
Infrastructure
Project 












250,000
 2.5
Del
Rio TX Streets/Roads Qualia
Loop
Relief
Route 










2,000,000
 20
Del
Rio TX Transit Fixed
Bus
Route
Transit 












800,000
 15
City State Program Project
Descrip3on Funding
Required Jobs
Del
Rio TX Water Water
Conserva3on
Plan 












500,000
 2
Del
Rio TX Water Water
Leak
Study
Water
Model
Study 












200,000
 2
Del
Rio TX Water Water
Treatment
Plant/Vibra3ng
Racks 










1,000,000
 3
Del
Rio TX Water Wastewater
Facility
Plan 










1,000,000
 4
Del
Rio TX Water Wastewater
Collec3on
Line 












600,000
 5
Del
Rio TX Water Lib
Sta3on
Upgrades 










4,000,000
 10
Del
Rio TX Water Water
System
Improvement 










1,000,000
 10
El
Paso TX CDBG Father
Mar3nez
Senior
Center
Improvements
‐
improvements
to
senior
center 












624,500
 14
El
Paso TX CDBG Bucher
Road
Street
and
Drainage
Improvements
‐
street
and
drainage
improvements 












709,600
 16
El
Paso TX CDBG Coronado
Road
Phase
2
Street
&
Drainage
improvements
‐
street
and
drainage
improvements 












937,128
 21
El
Paso TX CDBG Borderland
Area
Phase
7
Street
&
Drainage
Improvements
‐
street
and
drainage
improvements 










1,199,106
 27
El
Paso TX CDBG Chamizal
Wellnes
and
Neighborhood
Center
‐
renova3on
of
former
neighborhood
facility
to
City‐operated

center 










1,250,000
 28
El
Paso TX CDBG Central
Recrea3on
Center
Remodeling
‐
retrofic
and
renova3on
of
former
YMCA
facility
as
City
operated

recrea3on
center 










5,500,000
 122
El
Paso TX Energy Street
Light
Conversion
‐
replacement
of
exis3ng
street
lights
with
energy
efficient,
dark‐sky
compliant
fixtures 










5,000,000
 111
El
Paso TX Energy Landfill
Gas
to
Energy
‐
installa3on
of
energy
and
capture
systems
at
City‐owned
landfill 










6,250,000
 138
El
Paso TX Energy Facility
Energy
Efficiency
Retrofits
‐
retrofit
of
ligh3ng
and
HVAC
systems
to
energy
efficient
systems
at
exis3ng

City
facili3es 








30,000,000
 664
El
Paso TX Streets/Roads Street
Name
Sign
Replacement
city‐wide 












600,000
 13
El
Paso TX Streets/Roads Thermal
Plas3c
Lane
Marking
Installa3on
‐
City‐wide 










1,500,000
 33
El
Paso TX Streets/Roads Concrete
Sidewalk
Installa3ons
City‐wide
 










2,500,000
 55
El
Paso TX Streets/Roads Microsurfacing
city‐wide 










3,000,000
 66
El
Paso TX Streets/Roads New
Signal
Installa3on
‐
installa3on
of
traffic
signals
citywide
at
warranted
intersec3ons 










3,000,000
 66
El
Paso TX Streets/Roads Regulatory
&
Advisory
Sign
Replacement 










3,000,000
 66
El
Paso TX Streets/Roads Paving
Unpaved
ROW's
‐
Paving
of
Alleys
and
other
ROW's
city‐wide 










5,000,000
 111
El
Paso TX Streets/Roads Stanton
Street
Toll
Facility
Improvements
‐
improvements
to
interna3onal
bridge
to
facilitate
pedestrian
access











7,000,000
 155
El
Paso TX Streets/Roads Paso
del
Norte
Toll
Facility
Improvements
‐
improvements
to
interna3onal
bridge
to
facilitate
pedestrian
access









10,400,000
 230
El
Paso TX Streets/Roads Carolina
Bridge
Reconstruc3on
‐
reconstruc3on
and
widening
of
deficient
railroad
overpass 








11,367,320
 251
El
Paso TX Streets/Roads Pasodale
street
reconstruc3on
‐
reconstruc3on
of
streets
and
drainage
improvements
at
Pasodale
subdivision 








17,000,000
 376
El
Paso TX Streets/Roads Resurfacing
‐
resurfacing
of
city
streets
city‐wide;
includes
modifica3ons
for
ADA
accessibility
at
intersec3ons

and
bus
routes 








20,000,000
 442
El
Paso TX Streets/Roads Yarbrough
Bridge
Reconstruc3on
‐
reconstruc3on
of
deficient
railroad
overpass 








22,400,000
 495
El
Paso TX Transit Mission
Valley
Transit
Terminal
‐‐
Construc3on
of
new
transit
terminal
including
park‐n‐ride
facili3es 












604,000
 13
El
Paso TX Transit Westside
Transit
Terminal
‐‐
Construc3on
of
new
transit
terminal
including
park‐n‐ride
facili3es 










1,400,000
 31
El
Paso TX Transit Oregon
Street
Realignment/SMART
101
BRT
Route
‐‐
Street
and
parkway
improvements
for
starter
BRT
Route

from
downtown
to
University
of
Texas
at
El
Paso 










1,851,000
 41
El
Paso TX Transit Downtown
Transit
Terminal
‐
Construc3on
of
new
transit
terminal 










2,696,010
 60
El
Paso TX Transit Northgate
Transit
Terminal
‐‐
property
acquisi3on
and
construc3on
of
new
transit
terminal 










5,782,000
 128
El
Paso TX Transit Glory
Road
Transit
Terminal
‐‐
Construc3on
of
new
transit
terminal
including
parking
garage 










9,185,000
 203
El
Paso TX Transit Gas
Liquefac3on
Facility
‐
Construc3on
of
new
gas
liquefac3on
facility
to
migrate
mass
transit
fleet
to

alterna3ve
fuel 








11,248,600
 249
El
Paso TX Transit Maintenance,
Administra3on
&
Opera3ons
Facility
‐‐
construc3on
of
new
facility
to
house
mass
transit

department's
opera3ons 








20,000,000
 442
Euless TX CDBG Walking/Biking
Trails 












350,000
 10
Euless TX CDBG Animal
Shelter 










2,500,000
 15
Euless TX CDBG Parks
At
Texas
Star
‐
Phase
IV 










2,000,000
 15
Euless TX CDBG Euless
Housing
Revi3liza3on 










2,500,000
 20
Euless TX CDBG Sobball
World
Park
Improvements 












785,000
 25
Euless TX CDBG Police
and
Fire
Training
Center 










3,500,000
 35
Euless TX CDBG Midway
Park
Family
Life
Center
(Includes:

Senior
Center/Aqua3c
Facility) 








15,000,000
 125
Euless TX Public
Safety Replace
the
video
system
in
all
patrol
cars
with
digital
system 












220,000
 3
Euless TX Public
Safety Addi3onal
Police
Officers:
(3)
to
staff
addi3onal
district;
(7)
to
expand
the
SRO
Program
to
the
Elementary

Schools 












772,300
 10
Euless TX Public
Safety Rebuild
the
radio
system
infrastructure
for
Euless
and
5
other
municipali3es 








21,000,000
 50
Euless TX Streets/Roads City‐Wide
Traffic
Signal
Projects 












750,000
 16
Euless TX Streets/Roads City‐Wide
Sidewalk
Projects 












625,000
 17
Euless TX Streets/Roads City‐Wide
Street
Overlays 










2,500,000
 23
Euless TX Streets/Roads Paving
Project:

Cullum/Alexander 










1,650,000
 55
Euless TX Streets/Roads Paving
Project:

Ross
Avenue 












785,000
 55
Euless TX Streets/Roads Paving
Project:

Vine
Street 












775,000
 55
Euless TX Streets/Roads Paving
Project:

Ash
Lane 










2,650,000
 60
Euless TX Streets/Roads Paving
Project:

Baze
Road 










2,575,000
 60
Euless TX Streets/Roads State
Highway
121
at
Glade
Road
Braided
Ramp 










5,500,000
 70
Euless TX Water Recycled
Effluent
Water
Line 










2,500,000
 15
Euless TX Water Water
Main
Project:
Collin/Dallas/Denton/Harwood 












715,000
 15
Euless TX Water Water
Main
Project:
Live
Oak/Marlene 












650,000
 15
Euless TX Water Wastewater
Project:

Pauline/Norman/Franklin 












875,000
 19
Euless TX Water Wastewater
Project:

Ross/Whitener/Alexander
O.F. 












880,000
 19
Euless TX Water Wastewater
Project:

W.
Mills/Arnef/W.
Alexander 












975,000
 19
City State Program Project
Descrip3on Funding
Required Jobs
Euless TX Water Wastewater
Project:
Crane/Blanco/Collin/Aransas 












955,000
 19
Euless TX Water Wastewater
Project:
Oakwood
Terrace/Slaughter/Huif 










1,100,000
 19
Euless TX Water Water
Main
Project:
Fuller/Springwood/Kynefe 












910,000
 20
Euless TX Water Water
Main
Project:
S.
Pipeline/Westwood 












906,000
 20
Euless TX Water Water
Main
Project:
Stony
Creek/Eastcliff/Lifle
Creek 










1,050,000
 20
Euless TX Water Culvert
Replacement:

Kynefe
Drive 












725,000
 40
Euless TX Water Culvert
Replacement:

Marlene
Drive 












725,000
 40
Euless TX Water Culvert
Replacement:

Simmons
Drive 












850,000
 40
Euless TX Water Drainage
Project:

Hurricane
Creek 










4,333,000
 77
Euless TX Water Drainage
Project:

Boyd
Branch 










8,600,000
 90
Euless TX Water Lifle
Bear
Creek
Drainage
Improvements 








11,150,000
 100
Flower
Mound TX CDBG First‐3me
fire
protec3on
water,
sewer,
and
streets
paved
to
city
standards
in
a
low‐income
neighborhood 










1,436,177
 29
Flower
Mound TX Energy Replace
pneuma3c
control
system
&
upgrade
building
management
system 












100,000
 2
Fort
Worth TX Airport Spinks
Airport
&
Fire
Sta3on
#42
Improvements












9,000,000
 113
Fort
Worth TX CDBG Cobb
Park
Masterplan
Improvements 










9,520,000
 119
Fort
Worth TX CDBG New
Fire
Sta3ons:
Sta3on
#5;
Sta3on
#27;
and
Sta3on
#34 








11,000,000
 138
Fort
Worth TX CDBG Zoo
Infrastructure
Renova3ons:
Facili3es
and
Walkway
Renova3ons
($2.37M);
Parking
Garage
($14.4). 








16,770,000
 210
Fort
Worth TX CDBG Western
Heritage
Parking
Facility 








25,000,000
 313
Fort
Worth TX CDBG Regional
Swimming
Centers:
SE/SW
Natatorium
/
Community
Centers
($70.0M);
Medium
Aqua3c
Centers
($32.0M);
and
Spraygrounds

($4.0).
 






106,000,000
 1325
Fort
Worth TX CDBG Trinity
River
Vision
Flood
Control
&
Related
Projects:
U3lity
Reloca3ons
($60.0M);
Police
&
Fire
Training
Center
Reloca3on
Phase
1&2
($111.50);
Bypass
Channel

Arterial
Bridges
($90.0M);
Riverside
WWTP
Environmental
Remedia3on
&
Park
Restora3on
( 






383,500,000
 4794
Fort
Worth TX Streets/Roads Schools
To
Neighborhoods
Pedestrian
/
Bicycle
Connec3ons 










5,000,000
 63
Fort
Worth TX Streets/Roads Urban
Village
Transpora3on
Connec3ons 








10,000,000
 125
Fort
Worth TX Streets/Roads Arterial
Streets:
North
Beach
Street
($6.0M);
W.
Rosedale
Retrofit
($4.0M);
Silver
Creek
($2.0M);
Precinct
Line
($10.0M);

Summer
Creek
($3.0M);
Berry
Street
/
287
($1.5M);
Harley
Street
Drainage
&
Realignment
($45.0M);
and
Keller

Hicks
($4.0). 








75,500,000
 944
Fort
Worth TX Streets/Roads Southwest
Parkway
&
Related
Improvements:
Dirks
Road
($16.0M);
U3lity
Reloca3ons
($17.7M);
UPRR
Easments
&
Reloca3ons
($50.0M). 








83,700,000
 1046
Fort
Worth TX Streets/Roads IH‐35
/
IH‐820
Interchange 






200,000,000
 2500
Fort
Worth TX Transit 9th
Street
Walkable
Transit
Connec3ons 










1,500,000
 19
Fort
Worth TX Transit Fort
Worth
T
Rail
Improvements:
NE@SW
Rail 






471,000,000
 5888
Fort
Worth TX Water Botanic
Gardens
/
Botanical
Research
Ins3tute
Demonstra3on
Storm
Water
Management
Parking
Area 










6,000,000
 74
Fort
Worth TX Water Eastside
Water
Reuse
Project‐
reclama3on
water
for
irriga3on
and
other
water
uses
replacing
potable
water

usage 








55,500,000
 694
Fort
Worth TX Water Construct
New
Westside
Water
Treatment
Plant 








61,000,000
 763
Fort
Worth TX Water Sanitary
Sewer
Overflow,
Street
Rehabilita3on,
Ligh3ng
and
Signals:
SSO
Pipeline
Rehabilita3on
($123.0M);
Peak
Flow
Storage
Facility
($22.0M);
Street
Rebilita3ons
($17.0M);
and

Street
Ligh3ng/Signaliza3on
($15.3M).
 






177,300,000
 2216
Frisco TX Energy Realigning
Building
Ligh3ng
to
Reduce
Aber
Hours
Usage 












100,000

Frisco TX Energy Solar
Panels
to
Provide
Energy
to
City
Hall
Building 










2,000,000

Frisco TX Housing Ongoing
Public
Housing
Maintanence
and
Repair
Program 














50,000

Frisco TX Public
Safety Armored
Vehicle 












125,000

Frisco TX Public
Safety Electronic
Surveillance
Equipment 














55,000

Frisco TX Public
Safety Fingerprint
Analysis
Sobware 














55,000

Frisco TX Public
Safety Increase
Firearms
Training 














30,000

Frisco TX Public
Safety Mobile
Command
Post 












200,000

Frisco TX Public
Safety Police
&
Fire
Emergency
Communica3ons
System 










8,000,000

Frisco TX Public
Safety Detec3ve
for
Juvenile
Inves3ga3ons
Unit 












150,000
 2
Frisco TX Public
Safety Expand
Vic3m
Assistance
Program 












165,000
 2.25
Frisco TX Public
Safety Expand
the
School
Resource
Officer
Program
at
the
High
School
Level 












375,000
 5
Frisco TX Public
Safety Enhance
Patrol
Coverage 












900,000
 12
Frisco TX Streets/Roads Eldorado
Parkway
‐
widen
2
lane
rural
road 








10,000,000

Frisco TX Streets/Roads FM
3537
(SH
289
to
FM
2478) 








30,830,000

Frisco TX Streets/Roads FM
423
(Middle
Sec3on
‐
Stewart
Creek
to
Eldorado) 








45,000,000

Frisco TX Streets/Roads FM
423
(North
Sec3on
‐
Eldorado
to
US
380) 








50,000,000

Frisco TX Streets/Roads Lebanon
&
Dallas
North
Tollway
‐
intersec3on
improvement 










2,000,000

Frisco TX Streets/Roads Road
Expansion
‐‐
Teel
Parkway
from
Eldorado
to
Freestone 












500,000

Frisco TX Streets/Roads Rolater
Road
(Custer
‐
Independence) 










3,000,000

Frisco TX Streets/Roads Stonebrook
(FM
423
‐
Teel) 










8,500,000

Frisco TX Streets/Roads Stonebrook
(Legacy
‐
Longhorn) 








15,000,000

Frisco TX Streets/Roads Traffic
Signal
System
EOC
Expansion 












250,000

Frisco TX Streets/Roads Virginia
Parkway
(
Preston
‐
DNT) 








14,000,000

Frisco TX Streets/Roads Virginia
Parkway
(DNT
‐
CR
26) 










6,000,000

Frisco TX Transit Quiet
Zone
Improvements
‐
Crossing
Upgrades 










1,485,000

City State Program Project
Descrip3on Funding
Required Jobs
Frisco TX Water 12"
&
24"
Dallas
North
Tollway
Water
Lines 










3,000,000

Frisco TX Water 30"
Dallas
North
Parkway
Water
Line 










2,250,000

Frisco TX Water Cofonwood
Branch
Cameron
Way
&
Camfield
Way
flood
control 












250,000

Frisco TX Water Cofonwood
Creek
Lib
Sta3on 










3,600,000

Frisco TX Water Creek
on
the
Westside
of
Sunset
Drive
‐
flood
control 












250,000

Frisco TX Water Eldorado
Pump
Sta3on
Remedia3on 








10,000,000

Frisco TX Water Hillcrest
Road
&
Preston
Vineyard
Drive
Channel
Improvements 












500,000

Frisco TX Water Installa3on
of
delivery
system
for
currently
permifed
re‐use
water 










5,200,000

Frisco TX Water Main
Street
Pilot
Channel 










1,000,000

Frisco TX Water Northwest
Infrastructure
‐
12",
16",
20"
Virginia/Teel
Water
Lines 










4,000,000

Frisco TX Water Northwest
Infrastructure
‐
Sanitary
Sewer
Improvements 










2,000,000

Frisco TX Water Panther
Creek
Sewer
‐
Phase
2
(Parvin
Branch) 










3,500,000

Frisco TX Water Panther
Creek
WWTP
Expansion 








20,000,000

Frisco TX Water Preston
"24
Water
Line 










2,000,000

Frisco TX Water Repair
of
Eldorado
Earthern
Dam 










1,000,000

Frisco TX Water Stewart
Creek
Pilot
Channel 










2,000,000

Garland TX Streets/Roads Sidewalk
installa3on,
Beltline
Rd
from
Jupiter
Rd
to
Buckingham
(19,447
l.f.) 










1,458,525

Garland TX Streets/Roads Sidewalk
installa3on,
Rowlef
Rd
from
east
city
limits
to
Broadway
(15,392
l.f.)
 










1,154,400

Garland TX Streets/Roads Sidewalk
installa3on,
Shiloh
Rd
from
Buckingham
to
Kingsley
(22,183
l.f.) 










1,663,725

Garland TX Streets/Roads Street
reconstruc3on:
Briarwood,
5th
to
Glenbrook 










1,000,000

Garland TX Streets/Roads Street
reconstruc3on:
Bullock
from
Edgewood
to
Walnut 












450,000

Garland TX Streets/Roads Street
reconstruc3on:
Industrial
Dr
from
Kingsley
to
Wood 










1,050,000

Garland TX Streets/Roads Street
reconstruc3on:
Merrimac
Tr
from
Broadway
to
Colonel 










1,000,000

Garland TX Streets/Roads Street
reconstruc3on:
Oakland
Ave
from
Shiloh
to
Warehouse 












480,000

Garland TX Streets/Roads Street
reconstruc3on:
Shepherd
Dr
from
Ac3on
to
Forest
Lane 












780,000

Garland TX Streets/Roads Street
repair:
Centerville
Rd
from
Firewheel
Pkwy
to
IH
635 










1,000,000

Garland TX Streets/Roads Street
repair:
Forest
Ln
from
Garland
Ave
to
west
city
limits 












500,000

Garland TX Streets/Roads Street
repair:
Shiloh
Rd
from
Kingsley
to
SH
190 












250,000

Garland TX Water 1,000
lineal
feet
of
replacement
water
lines
(Jupiter
Road) 












400,000

Garland TX Water 10,500
feet
of
water
and
wastewater
replacement
(LBJ
Freeway) 










1,800,000

Garland TX Water 4,300
lineal
feet
of
relief
sewer
(Jupiter/Shiloh) 












800,000

Garland TX Water 4,700
feet
of
relief
sanitary
sewer
(Hubbard
Hills) 












800,000

Garland TX Water Construc3on
of
1,700
feet
of
new
21"
sanitary
sewer
(Firewheel) 












400,000

Garland TX Water Drainage
Improvements
(Cur3s
Drive) 












600,000

Garland TX Water Drainage
improvements
(Vanderbilt
Drive) 












350,000

Garland TX Water Erosion
control
project
(Allegheney
Trail) 












100,000

Garland TX Water Install
11,500
lineal
feet
of
30"
wastewater
relief
sewer
(ROWL
‐1) 










4,500,000

Garland TX Water Install
7,500
lineal
feet
of
relief
anitary
sewer
(Carroll/Bardfield) 










1,900,000

Garland TX Water Storm
Sewer
installa3on
(Club
Meadow) 












500,000

Garland TX Water Storm
sewer
sysytem
to
prevent
flooding
(Mint
Drive) 












400,000

Grand
Prairie TX CDBG Acquisi3on
of
land
for
parking
for
Main
street
businesses
and
artwork
display
for
the
Uptown
district 












500,000
 10
Grand
Prairie TX CDBG Expand
sidewalks
and
provide
ADA
compliance
to
promote
pedestrian
traffic
for
Main
Street
Businesses 












400,000
 10
Grand
Prairie TX CDBG Provide
direc3onal
signage
for
the
Uptown
District
and
for
the
en3re
city 












500,000
 12
Grand
Prairie TX CDBG Public
space
improvements
&
maintenance;
add
more
ligh3ng,
complete
sidewalk
repair,
install
landscaping,

irriga3on,
tree
wells,
park
benches,
receptacles 












600,000
 12
Grand
Prairie TX CDBG Landscape
wall
&
provide
irriga3on
that
will
buffer
Main
Street
businesses
from
the
railroad
tracks 












500,000
 15
Grand
Prairie TX CDBG Parking
for
Uptown
Theater
 












850,000
 15
Grand
Prairie TX CDBG Removal
of
pole
signs
in
Uptown
district. 












500,000
 20
Grand
Prairie TX CDBG Replacement
and/or
addi3on
of
canopies
or
awnings
that
will
shade
and
promote
pedestrian
traffic
in
the

Main
Street
Revitaliza3on
efforts 












600,000
 20
Grand
Prairie TX CDBG Abatement
of
lead
paint
from
buildings
on
Main
street
in
the
uptown
District 










1,000,000
 25
Grand
Prairie TX CDBG Relocate
Fire
Sta3on
7
to
provide
for
quicker
response
3mes
for
those
ci3zens
and
businesses
located
south
of

Camp
Wisdom. 








10,000,000
 25
Grand
Prairie TX CDBG Street
Light
Replacement
for
the
Uptown
district 










1,000,000
 25
Grand
Prairie TX CDBG Provide
addi3onal
parks
infrastructure
to
exis3ng
parks;
such
as
disc
golf,
addi3onal
picnic
tables,
playground

equipment,
and
other
outdoor
recrea3onal
facili3es 










1,850,000
 40
Grand
Prairie TX CDBG Provide
infrastructure
improvements
for
a
metropolitan
park
that
needs
addi3onal
park
roads,
picnic
tables,

boat
ramps,
camping
facili3es,
cabins
and
fishing
piers
which
will
provide
city
dwellers
closer
access
to
these

types
of
facili3es. 










2,500,000
 40
Grand
Prairie TX CDBG Construct
an
arboretum
on
historical
city
property. 










5,000,000
 45
Grand
Prairie TX CDBG Abatement
of
Asbestos
from
buildings
on
Main
Street
in
the
Uptown
district 










2,000,000
 50
Grand
Prairie TX CDBG Build
city
wide
trail
link
system
to
move
175,000
ci3zens
to
major
event
centers
such
as
lakes,
parks,
librairies,

downtown
and
schools. 










5,500,000
 50
Grand
Prairie TX CDBG Construct
a
Public
gathering
and
fes3val
loca3on
on
Main
street 










1,500,000
 50
Grand
Prairie TX CDBG Convert
a
vacant
school
into
a
municipal
building 










1,500,000
 50
Grand
Prairie TX CDBG Provide
6
buses
to
transport
ci3zens
to
major
recrea3on
facili3es
in
27
mile
long
community
serving
175,000

ci3zens.

There
is
no
current
public
transporta3on. 










2,950,000
 50
Grand
Prairie TX CDBG Provide
a
new
aqua3c
facility
for
the
Dalworth
community
center. 










7,500,000
 50
Grand
Prairie TX CDBG Provide
an
addi3on
to
the
Dalworth
neighborhood
community
center.
The
facility
was
built
in
the
1950's
and
is

in
dire
need
of
expansion
and
renova3on.
 










2,500,000
 50
Grand
Prairie TX CDBG Purchase
and
convert
empty
downtown
buildings
space
for
ar3st
sans
while
crea3ng
green
space
areas. 










5,000,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Grand
Prairie TX CDBG Provide
job
retraining
for
displaced
workers
in
community
facili3es.

Such
topics
for
retraining
could
include

the
following:
Hor3culture,
conference
center
opera3ons,
retail,
landscape
maintenance,
youth
center

leadership,
coaching,
food
and
beverage
 












795,000
 60
Grand
Prairie TX CDBG Reloca3on
of
overhead
u3li3es
to
be
placed
underground
for
the
Uptown
District 










4,000,000
 75
Grand
Prairie TX CDBG Weatherizing
&
provide
energy
efficient
windows,
roofs
and
enclosures
for
the
Uptown
District 










2,000,000
 100
Grand
Prairie TX CDBG Rebuild
2700
feet
of
dilapadated
Main
Street
facades
and
signage
to
jumpstart
the
ongoing
revitaliza3on
of
the

downtown
area.
The
City
of
Grand
Prairie
currently
is
inves3ng
funds
to
rejuvenate
this
area
to
afract
new

merchants
and
jobs. 










1,500,000
 150
Grand
Prairie TX Energy Provide
a
Energy
Efficient
Building
System
for
City
Buildings
which
are
currently
not
on
this
system. 










2,000,000
 25
Grand
Prairie TX Energy Relocate
overhead
power
transmission
lines
at
Public
Safety
building
and
Adult
Ac3vity
Center 










6,000,000
 25
Grand
Prairie TX Public
Safety Installa3on
of
new
gaslines
for
the
new
Public
Safety
building. 












350,000
 12
Grand
Prairie TX Public
Safety Installa3on
of
landscaping
and
trail
system
surrounding
the
new
Public
Safety
Building 










1,250,000
 20
Grand
Prairie TX Streets/Roads Extend
January
Lane
from
Dallas
Street
to
State
highway
161.

This
will
be

a
4
lane
road. 










3,100,000
 40
Grand
Prairie TX Streets/Roads Reconstruc3on
of
Camp
Wisdom
Road
Paving
from
Robinson
to
Carrier
Parkway
from
two
lane
to
Four
lanes.
 










3,100,000
 45
Grand
Prairie TX Streets/Roads Reconstruc3on
of
Freetown
Road
from
Corn
Valley
to
Carrier
Parkway.

This
would
change
it
from
a
two
lane

asphalt
road
to
a
three
lane
concrete
paved
road. 










3,100,000
 45
Grand
Prairie TX Streets/Roads Construct
a
5
lane
roadway
that
intersects
Interstate
Highway
30
at
Bagdad
and
Gifford. 










4,000,000
 50
Grand
Prairie TX Streets/Roads Repair
embankment
on
Lakeridge
Parkway
at
Joe
Pool
Lake. 










3,600,000
 50
Grand
Prairie TX Streets/Roads Construct
a
new
4
lane
road
between
State
Highway
360
and
Lakeridge
Parkway. 










7,100,000
 90
Grand
Prairie TX Streets/Roads Widened
Lakeridge
Parkway
from
4
lanes
to
6
lanes
between
Joe
Pool
Lake
and
Great
Southwest
Parkway 










7,930,000
 90
Grand
Prairie TX Water Provide
Strom
Drain
and
Wastewater
main
improvements
along
Nadine
Lane
from
Mafhew
Road
to
Prairie

Lane. 










1,292,000
 20
Grand
Prairie TX Water Install
South
Sector
of
Grand
Prairie
Wastewater
System.

This
wastewater
system
will
allow
the
development

of
over
5000
acres
in
the
City
South
of
Joe
Pool
Lake.

Over
9100
homes
are
planned
for
this
area. 










9,709,546
 850
Houston TX Streets/Roads West
Houston
Intelligent
Transporta3on
Systems
‐
Deployment
of
Intelligent
Transporta3on
Systems
technologies,
including
Advanced
Traffic
Management

System,
Advanced
Travel
Informa3on
System,
and
Traffic
Incident
Management
in
West
Houston
in
area
bou 








15,000,000
 50
Houston TX Streets/Roads Parker
Road
Paving
–
Thoroughfare
widening
between
Hardy
Toll
Road
and
Eastex
Freeway
(US
59)
in

Northeast
Houston. 










8,300,000
 230
Houston TX Streets/Roads Sims
Bayou
Hike
&
Bike
Trail
‐
Trail
between
IH
45
and
SH
288
for
access
to
schools
and
parks
near
Hobby

Airport
in
Southwest
Houston. 








13,000,000
 360
Houston TX Streets/Roads Tanner
Road
Paving
–
Thoroughfare
widening
between
Hempstead
and
Beltway
8
near
US
290
corridor
in

Northwest
Houston. 








13,136,000
 365
Houston TX Streets/Roads Homestead
Road
Grade
Separa3on
–
Grade
separa3on
for
Thoroughfare
over
Beaumont
Subdivision
track
of
Union
Pacific
Railroad
Company
in

Northeast
Houston. 








13,300,000
 370
Houston TX Streets/Roads Clinton
Drive
Reconstruc3on
–
Street
reconstruc3on
between

Wayside
to
eastern
City
Limits
near
Port
of

Houston
in
Southeast
Houston. 








14,000,000
 385
Houston TX Streets/Roads Greens
Road
Paving
‐
Thoroughfare
widening
between
Aldine‐Weszield
and
Lee
near
Bush
Intercon3nental

Airport
in
Northeast
Houston. 








19,260,000
 535
Houston TX Streets/Roads Buffalo
Speedway
Paving
and
Reconstruc3on
‐
Thoroughfare
extension
between
Holmes
and
Airport
and
street

reconstruc3on
between
Holcome
and
South
Braeswood
for
access
to
Texas
Medical
Center,
Greenway
Plaza,

and
Reliant
Park
in
Southwest
Houston. 








21,700,000
 600
Houston TX Streets/Roads Metro
Houston
Intermodal
Terminal
Streets
‐Street
infrastructure
improvements
and
street
access
on
Fulton,

Bayou
and
Burnef
for
new
Metro
Houston
Intermodal
Terminal
near
Downtown. 






175,000,000
 4870
Houston TX Water Almeda
Sanitary
Sewer
Tunnel
Rehabilita3on
‐
Rehabilita3on
of
84"
sanitary
sewer
by
chemical
grou3ng
and

sliplining
in
Southwest
Houston. 










5,000,000
 15
Houston TX Water City‐Wide
Wastewater
Collec3on
System
Rehabilita3on
and
Renewal 








15,000,000
 50
Houston TX Water City‐Wide
Sanitary
Sewer
Rehabilita3on
‐

Rehabilita3on
of
6"
‐
18"
sanitary
sewers
by
sliplining
or
pipe
 








35,000,000
 100
Houston TX Water Drinking
Water
Quality
Laboratory
at
East
Water
Purifica3on
Plant
–
Construc3on
of
new
drinking
water
quality
laboratory
at
East
Water
Purifica3on
Plant. 








19,000,000
 150
Houston TX Water City‐Wide
Flood
Control
Program
‐
Various
flood
control
projects
throughout
City
to
manage
stormwater

drainage,
pumping
and
deten3on
to
prevent
flooding. 






221,000,000
 4420
Hurst TX CDBG Repair
and
improvement
of
homes
in
CDBG
area,
including
updated
energy
improvements 












125,000
 2
Hurst TX CDBG Reconstruc3on
of
Redbud
Drive
with
replacement
of
old
water
and
sewer
lines,
sidewalks
 












380,000
 4
Hurst TX CDBG Reconstruc3on
of
Bellaire
Drive
with
replacement
of
old
water
and
sewer
lines
and
sidewalks











1,600,000
 16
Hurst TX Energy Conversion
of
incandesant
bulbed
traffic
signals
to
LED
lights
for
power
savings














175,000
 2
Hurst TX Energy Addi3on
of
alterna3ve
energy
to
power
low
wafage
devices
at
pump
sta3ons













260,000
 3
Hurst TX Energy Conversion
of
school
zone
warning
signs
to
solar
opera3on 












110,000
 4
Hurst TX Energy Municipal
Complex/Service
Center
Energy
Efficiency
Improvements 












400,000
 4
Hurst TX Housing Recrea3on
Center
renova3ons‐‐interior
remodel
work 












300,000
 10
Hurst TX Housing Aqua3cs
Centers
renova3ons 












700,000
 25
Hurst TX Housing Mayfair
Park
development‐‐add
playground,
trails,
pavillion,
picnic
tables,
landscaping 










1,200,000
 25
Hurst TX Housing Library
Renova3on
with
the
addi3on
of
a
large
program
room
and
interior
renova3ons 










3,600,000
 100
Hurst TX Housing Construc3on
of
a
Senior
Ci3zen
Center 










5,531,510
 200
Hurst TX Public
Safety Emergency
Warning
System 












200,000
 2
Hurst TX Public
Safety Radio
system
to
allow
inter‐operability
with
surrounding
ci3es 










1,900,000
 8
Hurst TX Public
Safety Renova3ons
of
Fire
Sta3on
#2
to
enhance
fire
protec3on
and
modernize
the
building 












850,000
 8
Hurst TX Public
Safety Wireless
Internet
Service
for
Residents 










1,000,000
 10
Hurst TX Public
Safety New
fire
sta3on
to
improve
service
to
south
Hurst. 










5,500,000
 12
Hurst TX Streets/Roads Lighted
Street
Name
Sign
Program
to
increase
driver
visibility
and
safety
and
sign
post
replacement
(to

breakaway
poles)
program 












225,000

City State Program Project
Descrip3on Funding
Required Jobs
Hurst TX Streets/Roads Street
and
drainage
Improvements

at
6
loca3ons
to
prevent
flooding 












275,000
 3
Hurst TX Streets/Roads conversion
of
metal
detector
loops
to
ITERIS
camera
detec3on
systems
at
signalized
intersec3ons 












160,000
 4
Hurst TX Streets/Roads Widening
of
Precinct
Line
Road
from
SH
10
to
city
limits 












375,000
 4
Hurst TX Streets/Roads Chisholm
Park
Road
improvements
to
enhance
safety
of
childern
and
motorists,
including
traffic
signal
for

access 












550,000
 6
Hurst TX Streets/Roads City
Street
Asphalt
overlay
replacement
program 












425,000
 10
Hurst TX Streets/Roads City
wide
Trails
system 










1,000,000
 10
Hurst TX Streets/Roads Reconstruc3on
of
Hayes
Lane
with
replacement
of
water
and
sewer
main
and
addi3on
of
storm
drainage
to

prevent
flooding 










1,200,000
 12
Hurst TX Streets/Roads Thousand
Oaks/Campus
drive
streetscape
and
reconstruc3on
project 










1,200,000
 12
Hurst TX Streets/Roads Melbourne
Road
widening,
Cheryl
to
Pipeline
Road 










2,100,000
 20
Hurst TX Streets/Roads NE
Mall
decelera3on/accelera3on
lane
@820 












205,000
 20
Hurst TX Streets/Roads Reconstruc3on
of
Pipeline
Road
from
Billie
Ruth
to
Precinct
Line
with
replacement
of
water
mains,
addi3on
of

traffic
signal,
pedestrian
crossing,
sidewalks,
street
ligh3ng 










2,000,000
 21
Hurst TX Streets/Roads Cofonbelt
Trail
system 










1,700,000
 80
Hurst TX Streets/Roads Widening
of
Pipeline
Road
from
east
of
Precinct
Line
Road
eastward
to
city
limits
with
replacement
of
water,

gas,
sewer
lines
and
addi3on
of
sidewalks 










8,000,000
 80
Hurst TX Water Large
Valve
replacement
to
repair
or
replace
broken
or
worn‐out
large
water
valves
ranging
in
size
16"‐24". 












110,000
 1
Hurst TX Water Bedford
Wastewater
Metering
Sta3on 














60,000
 2
Hurst TX Water Water
line
reloca3on
project:
SH
26
from
Mid‐Cites
to
city
limit
of
Colleyville 












225,000
 2
Hurst TX Water Rehabilita3on
of
Valen3ne
elevated
storage
tank,
involving
structural
member
repair
and
total
re‐pain3ng. 












575,000
 5
Hurst TX Water Sanitary
Sewer
Main
replacement
project
to
replace
old
sewer
mains,
mostly
vitrified
clay
lines. 












550,000
 6
Hurst TX Water Water
Main
Replacement
project
to
replace
old
cast
iron
mains
that
cause
service
disrup3ons
and
customer
 












550,000
 6
Irving TX CDBG Pump
Sta3on
System
Improvements:
Hackberry
and
Northgate
Pump
Sta3ons 










1,250,000
 4
Irving TX CDBG Concrete
Sewer
Line
Rehabilita3on:
Hackberry
Creek
Relief
Trunk
Sewer











1,100,000
 6
Irving TX CDBG Sanitary
Sewer
Rehabilita3on:
Nursery/Rock
Island
Railroad
Sanitary
Sewer
Improvements











2,200,000
 6
Irving TX CDBG Concrete
Sanitary
Sewer
Rehabilita3on:Loop
12/Grauwyler
Sanitary
Sewer
Rehabilita3on
 










1,400,000
 8
Irving TX CDBG Concrete
Sanitary
Sewer
Rehabilita3on:
Delaware
Creek
Sanitary
Sewer
Rehabilita3on 










5,400,000
 10
Irving TX CDBG Delaware
Creek
Flood
Control
Improvements:
Channel
Expansion











8,500,000
 10
Irving TX CDBG Construc3on
of
Indoor
Mul3‐Purpose
Recrea3on
Facility

to
enhance
economic
viability
of
regional
mall













3,000,000
 15
Irving TX CDBG Green
Fleet
‐
E85
Fueling
Sta3ons:
Alterna3ve
Flex
Fuel
Technology
will
replace
current
gasoline
use
with
an

85%
ethanol
and
15%
gasoline
blend
that
reduces
greenhouse
gas
emissions
such
as
CO2
by
39
‐
46%

compared
to
gasoline
only.















300,000
 20
Irving TX CDBG Neighborhood
Park
Development
to
increase
open‐space
for
neighborhoods
lacking
park
programming












5,000,000
 20
Irving TX CDBG Plymouth
Park
Rehabilita3on:
Produce
enhancements
in
the
Plymouth
Park
area
by
such
as
Story
Road

Streetscape
Enhancement,
Grauwyler
Road
Realignment,
Forma3on
of
a
Corridor
Business
Associa3on,

Reestablish
Neighborhood
Associa3on,
Story
Road
Land
Use 










6,000,000
 20
Irving TX CDBG Provide
for
the
construc3on
of
three
"green"/energy
efficient
homes
on
lots
recently
acquired
by
the
Irving

Housing
Finance
Corpora3on.
These
three
homes
would
meet
Energy
Star
cerfica3on
and
would
be
1,400‐
1,800
square
feet.
Funding
would
provide
for
 












500,000
 20
Irving TX CDBG Irving
City
Facili3es
Solar
Project:
Installa3on
of
solar
panels
on
the
roof
of
City
Hall
for
use
in
solar
thermal

water
hea3ng
system.
This
will
replace
the
use
of
natural
gas,
except
as
a
secondary
back
up
system.

Installa3on
of
solar
panels
on
roof 












150,000
 25
Irving TX CDBG Portable
Hydrogen
Fuel
Cell
–
Backup
Generators:
Use
of
emissions
free
hydrogen
fuel
cell
as
a
back
up

generator
to
power
City
of
Irving
facili3es
in
the
event
of
power
failure.
Fuel
cells
offer
cleaner,
more‐efficient

alterna3ves
to
the
combus3on
of
g 












500,000
 25
Irving TX CDBG Purchase,
rehabilita3on,
and
resale
of
12
affordable
exis3ng
homes.
Homes
with
average
purchase
prices
of

$70,000
and
repair
costs
of
$30,000
would
be
targeted.
These
homes
would
be
sold
to
low
and
moderate

income
candidates
who
would
receive
down
payme 










1,700,000
 30
Irving TX CDBG Developent
of
Library/Senior
Recrea3on
Center
that
is
a
mul3‐use
facility
that
serves
as
an
anchor
to
a
planned

regional
retail
development
enhancing
the
economic
development
of
the
region
while
providing
a
recrea3on

loca3on
 








20,000,000
 50
Irving TX CDBG Enhance
appearance
and
traffic
circula3on
at
intersec3on
of
Story,
Grauwyler
and
Irving
Blvd;
Relocate
fire

sta3on
to
vicinity
of
proposed
reroute 










3,500,000
 50
Irving TX CDBG The
comple3on
of
Campión
Trails
includes
the
construc3on
of
14
miles
of
12’
wide
concrete
trails
which
can
be

used
for
an
alterna3ve
mode
of
transporta3on,
such
as
bicycle
commu3ng.

Campión
Trails
is
an
adopted

segment
of
the
larger
Trinity
Trails
S 










7,000,000
 50
Irving TX CDBG Energy
Efficient
Building
Systems:
Increase
the
number
of
City
Buildings
which
are
currently
controlled
by
our

Central
Energy
Management
System.
The
summary
of
this
proposed
“Green
Project’
would
be
the
installa3on

of
an
Energy
Management
System
at
exist 










1,500,000
 75
Irving TX CDBG ONCOR
Reloca3on
Project
–
Texas
Stadium
–
Reloca3on
of
ONCOR
Transmission
towers
to
the
perimeter
of
the

Texas
Stadium
Property












3,065,168
 100
Irving TX CDBG Remodel
the
fire
sta3on
to
increase
response
3me,
improve
service
to
residents
and
businesses
while
making

the
facility
compa3ble
with
future
DART
rail
line











8,000,000
 100
Irving TX CDBG Northwest
Branch
Library
will
be
a
25,000
square
foot
branch
library
which
will
replace
the
exis3ng
10,000

square
foot
branch
housed
in
a
shopping
center.

The
building
will
be
designed
to
bring
state
of
the
art
library

services
to
the
northwest
sec3on
 










8,000,000
 250
City State Program Project
Descrip3on Funding
Required Jobs
Irving TX CDBG Construct
a
12,000
square
foot
fire
sta3on
housing
a
truck
and
crew,
rescue
truck,
ambulance
and
bafalion

chief.

The
sta3on
will
replace
exis3ng
sta3on
#4
which
is
outdated
and
too
small
to
meet
the
current
needs
of

the
community.

The
building
will 










5,000,000
 275
Irving TX CDBG ICON:
A
335,737
square
feet
office
tower
which
includes
a
260‐unit
high
rise
residen3al
tower
and
250
room

hotel
in
Urban
Center







350,000,000
 2000
Irving TX CDBG Waterstreet:
A
mixed
use
project
with
300,000
square
feet
of
retail,
600
residen3al
units
and
250,000
square

feet
of
office
space
in
Urban
Center.









350,000,000
 2000
Irving TX CDBG Conven3on
Center/Entertainment
Venue:
275,000
square
foot
conven3on
center
and
mixed
use

entertainment
district
project
will
be
on
40‐acres
in
the
Las
Colinas
Urban
Center.Components
of
the
project

include
300,000
square
feet
of
entertainment
venue
on
t 






350,000,000
 3000
Irving TX Energy Increase
life
cycle
of
landfill
for
Irving
residents
and
customers
in
the
region.











5,000,000
 15
Irving TX Energy Green
Fleet
‐
E85
Fueling
Sta3ons:
Alterna3ve
Flex
Fuel
Technology
will
replace
current
gasoline
use
with
an

85%
ethanol
and
15%
gasoline
blend
that
reduces
greenhouse
gas
emissions
such
as
CO2
by
39
‐
46%

compared
to
gasoline
only.















300,000
 20
Irving TX Energy Provide
for
the
construc3on
of
three
"green"/energy
efficient
homes
on
lots
recently
acquired
by
the
Irving

Housing
Finance
Corpora3on.
These
three
homes
would
meet
Energy
Star
cerfica3on
and
would
be
1,400‐
1,800
square
feet.
Funding
would
provide
for
 












500,000
 20
Irving TX Energy Installa3on
of
solar
panels
on
the
roof
of
City
Hall
for
use
in
solar
thermal
water
hea3ng
system.
This
will

replace
the
use
of
natural
gas,
except
as
a
secondary
back
up
system.
Installa3on
of
solar
panels
on
roof
of

Irving
Senior
Center
to
heat
pool
 












150,000
 25
Irving TX Energy Portable
Hydrogen
Fuel
Cell
–
Backup
Generators:
Use
of
emissions
free
hydrogen
fuel
cell
as
a
back
up

generator
to
power
City
of
Irving
facili3es
in
the
event
of
power
failure.
Fuel
cells
offer
cleaner,
more‐efficient

alterna3ves
to
the
combus3on
of
g 












500,000
 25
Irving TX Energy Energy
Efficient
Building
Systems:

Increase
the
number
of
City
Buildings
which
are
currently
controlled
by
our
Central
Energy
Management

System.
The
summary
of
this
proposed
“Green
Project’
would
be
the
installa3on
of
an
Energy
Management

System
at
exi 








15,000,000
 75
Irving TX Public
Safety Update
of
Radio
Communica3on
System
for
Police,
Fire,
Code
Enforcement
and
Animal
Services









15,000,000
 15
Irving TX Public
Safety Citywide
Security
System
(Biometric,
RFID,
Digital
Camera,
Water
Tower,
U3lity
Protec3on,
etc)












5,000,000
 20
Irving TX Public
Safety Regional
Radio
/
Fiber
Op3cs
Communica3ons
System
(Radio,
Data,
Voice,
Video,
Traffic,
Control,
Broadband,

etc)










35,000,000
 25
Irving TX Public
Safety Irving
Mul3‐Use
Public
Safety
Command
and
Control
Complex:
The
Complex
would
encompass
Irving’s

Emergency
Opera3ons
Center
(EOC),
Police
and
Fire
Training
Academy,
the
public
safety
and
service
radio

management
system,
along
with
addi3onal
facili3es
s 








24,700,000
 50
Irving TX Public
Safety ONCOR
Reloca3on
Project
–
Texas
Stadium
–
Reloca3on
of
ONCOR
Transmission
towers
to
the
perimeter
of
the

Texas
Stadium
Property












3,065,168
 100
Irving TX Public
Safety Remodel
fire
sta3on
#8
to
increase
response
3me,
improve
service
to
residents
and
businesses
while
making

the
facility
compa3ble
with
future
DART
rail
line











8,000,000
 100
Irving TX Public
Safety Construct
a
12,000
square
foot
fire
sta3on
#4
housing
a
truck
and
crew,
rescue
truck,
ambulance
and
bafalion

chief.

The
sta3on
will
replace
exis3ng
sta3on
#4
which
is
outdated
and
too
small
to
meet
the
current
needs
of

the
community.

The
building
w 










5,000,000
 275
Irving TX Streets/Roads Enhance
appearance
and
traffic
circula3on
at
intersec3on
of
Story,
Grauwyler
and
Irving
Blvd;
Relocate
fire

sta3on
to
vicinity
of
proposed
reroute











3,500,000
 50
Irving TX Transit Construct
DART/APT
Connector
in
the
Las
Colinas
Urban
Center











3,700,000
 30
Irving TX Water Pump
Sta3on
System
Improvements:
Hackberry
and
Northgate
Pump
Sta3ons











1,250,000
 4
Irving TX Water Concrete
Sewer
Line
Rehabilita3on:
Hackberry
Creek
Relief
Trunk
Sewer











1,100,000
 6
Irving TX Water Sanitary
Sewer
Rehabilita3on:
Nursery/Rock
Island
Railroad
Sanitary
Sewer
Improvements











2,200,000
 6
Irving TX Water Concrete
Sanitary
Sewer
Rehabilita3on:Loop
12/Grauwyler
Sanitary
Sewer
Rehabilita3on












1,400,000
 8
Irving TX Water Concrete
Sanitary
Sewer
Rehabilita3on:
Delaware
Creek
Sanitary
Sewer
Rehabilita3on











5,400,000
 10
Irving TX Water Delaware
Creek
Flood
Control
Improvements:
Channel
Expansion











8,500,000
 10
Kileen TX Airport North
Slope
Drainage
Flume 












886,945
 5
Kileen TX Airport Runway
33
Blast
Pad 












795,723
 5
Kileen TX Airport Runway
Slurry
Seal 










5,834,825
 15
Kileen TX CDBG Downtown
park
space
development 












350,000
 8
Kileen TX CDBG Downtown
underground
u3li3es 










1,000,000
 15
Kileen TX CDBG Housing
Rehabilita3on
in
older
neighborhoods
(energy
efficiency) 










1,000,000
 15
Kileen TX CDBG Downtown
HEB
redevelopment 










2,000,000
 20
Kileen TX CDBG Downtown
street
improvements 










2,000,000
 20
Kileen TX CDBG Expansion
of
Families
in
Crisis
for
emergency
shelter‐general
pop. 










1,000,000
 20
Kileen TX CDBG Expansion
of
Greater
Kileen
Free
Clinic 












500,000
 20
City State Program Project
Descrip3on Funding
Required Jobs
Kileen TX CDBG Sewer
Rehabilita3on
in
older
neighborhoods 










1,000,000
 20
Kileen TX CDBG Water
line
replacement
in
older
neighborhoods 










1,000,000
 20
Kileen TX CDBG One
Stop
Center
for
Human
and
Social
Services 










8,000,000
 50
Kileen TX CDBG Cultural
Ac3vi3es
Center 










8,000,000
 60
Kileen TX Housing Electrical
upgrades
to
145
units 












500,000

Kileen TX Housing Porch
replacements
to
75
units
at
Moss
Rose 












500,000

Kileen TX Housing Water
line
replacements
to
145
units
of
public
housing 












350,000

Kileen TX Housing Electrical
upgrades
to
75
units
at
Moss
Rose 












250,000
 25
Kileen TX Housing Gas
service
lines
upgrades
to
75
units
at
Moss
Rose 












500,000
 25
Kileen TX Public
Safety Family
Resource
Coordinator
Program 














45,000
 1
Kileen TX Public
Safety Fully
staff
Regional
Airport 












423,839
 7
Kileen TX Public
Safety Fully
staff
PD
Headquarters 










5,992,655
 44
Kileen TX Streets/Roads Stagecoach
Rd
(Sec3ons
1‐4),
S.
FH
St
to
HH
City
Limits 










5,000,000

Kileen TX Streets/Roads Old
Florence
Rd,
Elms
Rd
to
Stan
Schlueter 










1,980,750
 16
Kileen TX Streets/Roads Bunny
Trail,
Stan
Schlueter
Loop
to
reese
Creek
Rd 










2,208,700
 17
Kileen TX Streets/Roads E.
Trimmier
Rd,
Stagecoach
to
Chaparral 










2,663,150
 21
Kileen TX Streets/Roads Bacon
Ranch
Road,
US
190
Access
Road
to
Greenlee
Dr 










3,195,850
 25
Kileen TX Streets/Roads Ft.
Hood
Projects
(SH
201
&
Mohawk;
Eastgate
SH
195
(Rancier
to
central);
US
190
railhead
(Overpass) 










4,692,650
 37
Kileen TX Streets/Roads Lowes
Blvd
Extension,
Trimmier
Rd
to
Florence
Rd 










5,668,300
 45
Kileen TX Streets/Roads Rosewood
Drive,
Stagecoach
to
Chaparral 










5,945,125
 47
Kileen TX Streets/Roads Trimmier
Rd,
Stagecoach
to
Chaparral 










6,047,500
 47
Kileen TX Streets/Roads Widen
US190
from
4
Lanes
to
6
Lanes
from
Copperas
Cove
City
Limits
to
Harker
Heights
City
Limits
with

Approaches
&
Bridges
within
Exis3ng
ROW 










6,099,375
 48
Kileen TX Streets/Roads Bacon
Ranch
Rd,
WS
Young
Dr
to
Cunningham
Rd 










6,719,250
 53
Kileen TX Streets/Roads Lifle
Nolan
Rd,
WS
Young
Dr
to
Cunnungham 










7,461,875
 59
Kileen TX Streets/Roads Rosewood
Dr,
US190
to
Stagecoach 










8,579,800
 68
Kileen TX Streets/Roads Elms
Road,
S.
FH
St
to
Carpet
Lane 










8,915,625
 70
Kileen TX Streets/Roads Featherline
Rd,
Stagecoach
to
Chaparral 








11,263,128
 87
Kileen TX Streets/Roads Trimmer
Road,
Right
Turn
lane
from
Lowes
Blvd
to
US190 








15,898,300
 125
Kileen TX Streets/Roads Elms
Rd,
S.
FH
St
to
Clear
Creek
Rd. 








18,666,900
 148
Kileen TX Streets/Roads Cunningham
Road
(Sec3ons
1‐5),
US190
to
Chaparral 








25,013,790
 198
Kileen TX Streets/Roads Chaparral
Rd,
S.FH
St
to
HH
City
Limits 








35,000,000
 277
Kileen TX Water Bell
Co.
WCID
No.
1
Project
Par3cipa3on
Kileen TX Water City/Owner
Agreement
Waterline
Extension
Projects 












200,000
 0
Kileen TX Water Citywide
Inflow/Infiltra3on
Study 












250,000
 0
Kileen TX Water Miscellaneous
Rehabilita3on
Projects 












300,000
 0
Kileen TX Water Lake
Road
Waterline 












140,000
 1
Kileen TX Water Pump
Sta3on
#3
Upgrade 












200,000
 1
Kileen TX Water Goodnight
Ranch
Wastewater
Interceptor,
Lib
Sta3on
#22
&
Forcemain 












500,000
 2
Kileen TX Water Sep3c
Tank
Elimina3on
Program
Phase
V 












500,000
 2
Kileen TX Water State
Hwy.
195/West
Stagecoach
Road/Reese
Creek
Road
Waterline 












500,000
 2
Kileen TX Water Downtown
Water
&
Wastewater
Infrastructure
Replacement 












950,000
 4
Kileen TX Water Lib
Sta3on
#8
Reconstruc3on 










1,000,000
 4
Kileen TX Water Bundrant
Elevated
Storage
Tank 










1,200,000
 6
Kileen TX Water N.
Reese
Creek
Wastewater
Interceptor,
Lib
Sta3on
#20
&
Forcemain 










1,500,000
 8
Kileen TX Water Eastside
Water
&
Wastewater
Infrastructure
Phase
2 










3,900,000
 12
La
Porte TX CDBG Main
Street
Redevelopment 










4,800,000
 300
La
Porte TX CDBG Life
Style
Center 










7,600,000
 400
La
Porte TX Water Sens
Road
U3lity
Reloca3on
for
street
widening 










1,800,000
 50
Laredo TX Airport Rehabilitate
General
Avia3on
Apron
Phase
4 










4,230,000
 120
Laredo TX CDBG Eistefer
Park
Mul3‐purpose
Area‐park
improvements
includes
a
mul3puropose
field
and
other
amenites,
i.e.

ligh3ng,
irriga3on,
hydro
seeding,
etc.

New
restroom
facili3es
and
racquetball
court
will
be
included 












250,000
 40
Laredo TX CDBG Animal
Shelter 










5,000,000
 80
Laredo TX CDBG Phase
III
Clinic
Renova3on
&
Parking
Lot
Expansion‐Renovate
the
TB,
primary
care,
well
child
and
maternity

clincs
for
more
efficient
and
quality
health
care,
and
expand
parking
for
72
spaces
to
include
fencing 










1,500,000
 80
Laredo TX CDBG Independence
Hills 










3,500,000
 100
Laredo TX CDBG Chacon
Hike
&
Bike
Trail 










6,000,000
 125
Laredo TX CDBG Slaughter
Park
Phase
II‐to
include
a
recrea3onal
pool,
Tech‐Rec
Center
and
outdoor
park
ameni3es 










5,000,000
 160
Laredo TX CDBG Haynes
Recrea3on
Center
‐‐
a
recrea3on
center
of
approximately
35,000
sq.
b.
with
indoor
and
outdoor

ameni3es 








11,000,000
 175
Laredo TX CDBG Northwest
Recrea3on
Center
‐‐
a
recrea3on
center
of
approximately
35,000
sq.
b.
with
indoor
ameni3es
and

outdoor
park
area 










7,500,000
 175
Laredo TX CDBG South
Laredo
Library/WIC
Clinic 










6,300,000
 178
Laredo TX Public
Safety Citywide
Wi‐Fi
Pilot
Project 










1,000,000
 55
Laredo TX Public
Safety Bridge
Lane
Barrier
System 












600,000
 65
Laredo TX Public
Safety Bridge
Aler3ng
System 














70,000
 70
Laredo TX Public
Safety Ambulance
Replacement
X
4
@
250,000.00 










1,000,000
 80
Laredo TX Public
Safety Fire
Pumper
Replacement
X
4
@
350,000.00
each 










1,400,000
 100
Laredo TX Public
Safety Aerial/
Ladder
Truck
Replacements
x
3
@
850,000.00
each 










2,550,000
 150
Laredo TX Public
Safety City
of
Laredo
Fire
Administra3on
Center 








10,000,000
 400
Laredo TX Schools TAMIU
Side
Walk
Projects 












190,000
 50
City State Program Project
Descrip3on Funding
Required Jobs
Laredo TX Schools Alternate
Entrance
(TAMIU) 












680,000
 80
Laredo TX Schools Comple3on
of
Loop
Road(TAMIU) 












900,000
 100
Laredo TX Schools Historic
Housing(LCC
Main) 










2,110,378
 133
Laredo TX Schools Portable
Buildings
(LCC
Main) 










2,550,000
 159
Laredo TX Schools Athle3c
Field
Improvements(LCC
Main) 










5,488,302
 343
Laredo TX Schools Infrastructure(LCC
Main) 










5,503,000
 344
Laredo TX Schools South
Campus
Improvments
(LCC
South) 










6,710,000
 419
Laredo TX Schools Historic
Buildings(LCC
Main) 








15,868,411
 993
Laredo TX Schools New
Construc3on
Buildings(LCC
Main) 








38,624,059
 2225
Laredo TX Schools Instruc3onal
Buildings(LCC
Main) 








47,668,382
 2980
Laredo TX Streets/Roads River
Road
Project‐overlay
of
2"
asphalt
over
1.7
miles
of
newly
contructed
all
weather
Border
Patrol
road 












500,000
 50
Laredo TX Streets/Roads World
Trade
Bridge
Hazardous
Material
Containment
System
Retrofit
Project 










1,063,000
 145
Laredo TX Streets/Roads WTB
Offsite
Containment
Facility 










1,100,000
 145
Laredo TX Streets/Roads Canal
Street
Drainage
 










2,500,000
 150
Laredo TX Streets/Roads India
Avenue
Drainage
 










1,700,000
 150
Laredo TX Streets/Roads Jacaman
Road
Bridge
 










2,500,000
 150
Laredo TX Streets/Roads Manadas
Creek
Drainage
Improvements 










2,500,000
 150
Laredo TX Streets/Roads Rosario
Street
Improvement
w/
Drainage/Water
and
Sewer 










2,500,000
 150
Laredo TX Streets/Roads San
Isidro
Hike/
Bike
trail 










3,000,000
 150
Laredo TX Streets/Roads Bartlef
Avenue
Extension
 










3,000,000
 200
Laredo TX Streets/Roads Cuatro
Vientos
CSJ
0922‐33‐043 








82,770,000
 200
Laredo TX Streets/Roads Cuatro
Vientos
CSJ
0922‐33‐096 










9,946,755
 200
Laredo TX Streets/Roads Elijido
Avenue
Extension 










1,660,000
 200
Laredo TX Streets/Roads Shiloh
Drive
Extension 










1,300,000
 200
Laredo TX Streets/Roads Chihuahua/
Guadalupe
CSJ
0086‐01‐052 








32,121,892
 300
Laredo TX Streets/Roads World
Trade
Bridge
Inspec3on
Sta3on
Expansion
Project 










8,606,000
 300
Laredo TX Transit Bus
Replacement
(22) 










7,600,000

Laredo TX Water 36"
Sanitary
Sewer
Trunk
Main‐South
Laredo 












480,000
 50
Laredo TX Water 24"
Water
Transmission
Line‐Michigan
Avenue
from
MOHOC
to
Interna3onal
Blvd. 










3,918,000
 125
Laredo TX Water 24"
Water
Transmission
Line‐Loop
20
from
TAMIU
Elevated
Storage
Tank
 










1,900,000
 150
Laredo TX Water South
Laredo
Wastewater
Treatment
Plant
1.5
MGD
Expansion 










4,583,000
 150
Laredo TX Water Jefferson
Water
Treatment
Plan
Electrical
&
Filtra3on
Improvements 








47,000,000
 300
Laredo TX Water North
Laredo
Wastewater
Treatment
Plant‐a
3
MGD
plant
which
will
provide
service
to
northeast
Laredo 








12,000,000
 300
Longview TX Public
Safety Personal
protec3ve
equipment
and
radio
equipment
for
SWAT
team
providing
regional
law
enforcement

support. 














65,384
 0
Longview TX Public
Safety Interoperable
Radio
System
‐
construct
and
install
radio
system
tower
and
equipment
to
provide

interoperable

digital
communica3on
system
for
police
department
and
other
public
safety
agencies. 










6,900,000
 5
Longview TX Streets/Roads Downtown
Railroad
Quiet
Zones
are
designed
to
improved
safety
at
the
street/rail
crossings
and
reduce
noise

levels
in
the
downtown
area. 












300,000
 15
Longview TX Transit Electronic
Fare
Collec3on
System
‐
System
will
allow
transit
customers
to
u3lize
a
debit/credit
system
to

provide
a
more
accountable
fare
collec3on
system.

This
will
limit
future
fare
increases
by
maximizing

collec3on
at
current
rates. 












500,000
 0
Longview TX Transit Transit
Bus
Replacement
Program
‐
Currently
plan
to
purchase
three
new
buses
to
replace
por3on
of
aging

fleet
to
insure
reliable
service. 












386,000
 0
Longview TX Transit Bus
Wash
Facility
‐
facility
to
properly
care
for
buses
and
equipment. 














20,000
 2
Longview TX Water East
Loop
281
Water
Line
Exens3on
to
promote
source
water
availability
to
area
of
the
city
currently
not

served.

A
12"
in
water
line
is
proposed
to
serve
74
acres
of
undeveloped
land. 










1,575,000
 10
Longview TX Water Water
Treatment
Plant
Rehabilita3on
‐
this
planned
project
will
make
improvements
to
a
30
year
old
water

treatment
plant
and
add
a
raw
water
resevoir
to
improve
overall
water
quality
and
lower
treatment
costs
and

costs
to
water
customers. 










6,800,000
 30
Lu•in TX Water The
City
of
Lu•in
has
been
working
on
developing
water
resources
on
Lake
Sam
Rayburn
in
Angelina
County,

Texas.

The
City
owns
water
rights
on
the
Lake
and
has
purchased
easements
and
obtained
permits
to
develop

a
water
plant.

The
City
can
bid
the
proje 








35,000,000
 150
McAllen TX Airport Airside
Service
Road 










1,500,000
 0
McAllen TX Airport Land
Acquisi3on 










1,500,000
 0
McAllen TX Airport Mobile
Aircrab
Fire
Trainer 












800,000
 0
McAllen TX Airport Terminal
Expansion
Design 










1,500,000
 0
McAllen TX CDBG 3
Miles
of
Sidewalk 












400,000

McAllen TX CDBG Helping
Hand
Grants
‐
25
borrowers 












250,000

McAllen TX CDBG Installa3on
of
Street
Ligh3ng 












230,000

McAllen TX CDBG New
Beginnings
Rehabilita3on/Replacement
(12) 












252,000

McAllen TX CDBG Re3ree
Haven
Park 












250,000

McAllen TX CDBG Scafered
Site
New
Construc3on
‐
5
Units 












260,000

McAllen TX CDBG 5
Trail
restrooms
and
trail
parking
nodes 












250,000
 4
McAllen TX CDBG Old
Waste
Water
Plant
Lagoon
Water
Conserva3on
Project 












125,000
 7
McAllen TX CDBG Uvalde
Prac3ce
Fields
Parking
and
Shade
Structures 












120,000
 7
McAllen TX CDBG Springfest
park
‐
Development
Sportsfiel
Use
(fencing,
restrooms,
irriga3on,
parking) 












450,000
 13
McAllen TX CDBG Motorcross
Park
south
of
Airport
‐
development
for
off‐road
use
to
afract
people
to
MFE 












150,000
 16
McAllen TX CDBG Los
Encinos
Park
‐
Construc3on
of
Family
Reunion
Pavilion 












350,000
 20
McAllen TX CDBG Palmview
Community
Center
‐
Add
Fitness
Lifestyles
Fitness
Room
on
North
Side 












325,000
 26
McAllen TX CDBG Trail
Development
of
Business
83
‐
Jackson
to
Taylor
Road 












840,000
 30
McAllen TX CDBG Archer
Park
Rehabilitate
Amphitheater,
Landscaping,
Bandstand 












900,000
 53
City State Program Project
Descrip3on Funding
Required Jobs
McAllen TX CDBG Las
Palmas
Community
Center
‐
Demo
Old
Adult
Educa3on
Building
and
Build
New
Adult
Center
and
rehab
old

building 










2,250,000
 130
McAllen TX Energy Upgrade
Electrical
Breakers
to
Current
Code 














40,000
 1
McAllen TX Energy Solar
Shade
Repair 














20,000
 2
McAllen TX Energy Duct
Cleaning
and
Repair 














30,000
 3
McAllen TX Energy HVAC
Balancing 














30,000
 3
McAllen TX Energy Conversion
of
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
DeLeon
Soccer
Complex 














25,000
 4
McAllen TX Energy Conversion
of
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
Jackson
City
School
Park 














30,000
 4
McAllen TX Energy Conversion
of
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
La
Vista
Park 














35,000
 4
McAllen TX Energy Conversion
of
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
Los
Encinos
‐
purchase
water
well

south
of
Sara,
run
pipeline,
install
pump 












120,000
 4
McAllen TX Energy Ligh3ng
at
2nd
street
‐
Trenton
Road
to
Wisconsin
Road 












110,000
 4
McAllen TX Energy Ligh3ng
at
Bicentennial
Trail
‐
Nolana
to
Pecan
 












135,000
 4
McAllen TX Energy Upgrade
Fluorescent
Fixtures 












150,000
 5
McAllen TX Energy Cascade
Park
Lifle
League
Fields 














85,000
 7
McAllen TX Energy Los
Encinos
Soccer
Fields 












150,000
 7
McAllen TX Energy North‐bound
Pedestrian
Interna3onal
Bridge
Canopy
(canopy
retrofit
with
photovoltaic
system) 












270,000
 10
McAllen TX Energy Recycling
Center
Photovoltaic
System
Installa3on 












350,000
 10
McAllen TX Energy Sentri
Lane
Canopy
at
Interna3onal
Port
of
Entry
(photovoltaic
retro‐fit) 












162,000
 10
McAllen TX Energy City
Hall
Annex
at
Pecan
Re‐roofing
(cool
roof,
photovoltaic
system) 












750,000
 15
McAllen TX Energy Conven3on
Center
Parking
Area
Ligh3ng
(photovoltaic
installa3on) 












432,000
 15
McAllen TX Energy Conven3on
Center
Roof‐top
(photovoltaic
installa3on) 












400,000
 15
McAllen TX Energy Intermodal
Transit
Terminal
Improvements
(photovoltaics
to
power
exterior
ligh3ng,
fans,
mis3ng) 












250,000
 15
McAllen TX Energy North
Police
Training/Community
Center
(Addi3onal
funding
for
photovoltaic
installa3ons) 












500,000
 15
McAllen TX Energy South‐bound
Interna3onal
Port
of
Entry
Canopy
(photovoltaic
system,
cool
roof) 












378,000
 15
McAllen TX Energy Tax‐Office
Re‐roofing
(cool
roof,
photovoltaic
system) 












600,000
 15
McAllen TX Energy Development
Services
Building 










2,000,000
 20
McAllen TX Energy Quinta
Natural
Science
Indoor/Outdoor
Classroom
(energy
efficient
HVAC,
photovoltaics,
cool
roof) 












540,000
 20
McAllen TX Energy Interna3onal
Museum
of
Arts
&
Sciences
(Energy
Efficient
HVAC,
photovoltaic
installa3on) 










1,620,000
 25
McAllen TX Energy Conversion
of
13
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
Hike
and
Bike
Trails 












247,000
 52
McAllen TX Energy Development
Center
(cool/green
roof
with
photovoltaic
installa3on) 










2,810,000
 65
McAllen TX Energy Parking
Garage
Roof‐top
Farmer's
Market
(photovoltaic
power
genera3on,
cool
roof) 












250,000
 80
McAllen TX Housing Upgrade/modify
exis3ng
bathroom
facili3es
in
handicap
units
to
current
ADA
compliant
features 














30,000

McAllen TX Housing ADA
Accessibility
Improvements
for
Cesar
Chavez
Learning
Center 















7,000
 2
McAllen TX Housing Cesar
Chavez
Learning
Center
parking
lot
re‐surface
and
striping
including
handicap
ramps 














25,000
 4
McAllen TX Housing ADA
Accessibility
Improvements
for
Vine
Terrace 












200,000
 6
McAllen TX Housing Replace
Exis3ng
Vinyl
Tile
Flooring 












130,000
 6
McAllen TX Housing Re‐surface
interior
streets
for
Vine
Terrace 














60,000
 6
McAllen TX Housing Replace
Interior
Doors 














60,000
 7
McAllen TX Housing Re‐surface
interior
street
for
Retama
Village 














30,000
 8
McAllen TX Housing Roof
Improvements
Including
Rain
Gufers 












400,000
 10
McAllen TX Housing Replace
Exis3ng
Exterior
Doors
and
Screen
Doors 












100,000
 15
McAllen TX Housing Construc3on
of
new
Community
Center
for
Vine
Terrace 










1,200,000
 20
McAllen TX Housing Replace
Exis3ng
Windows
in
all
Units
with
Energy
Efficient
Product 












200,000
 53
McAllen TX Public
Safety Homeland
Security
Over3me
Program 












375,693
 10
McAllen TX Public
Safety Fire
Sta3on
#3 










1,500,000
 15
McAllen TX Public
Safety Homeland
Security
Overlay
Patrol
Program 










1,628,306
 30
McAllen TX Public
Safety North
Police
Community
Center 










3,500,000
 40
McAllen TX Public
Safety Video
Surveillance
System 










2,000,000
 40
McAllen TX Streets/Roads Mar3n
Avenue
widening
and
RR
crossing
 












400,400
 20
McAllen TX Streets/Roads Replacing
Impact
Afenuators
on
various
bridge
railings 












252,000
 23
McAllen TX Streets/Roads 29th
(Oxford
to
Sprague) 










1,102,000
 35
McAllen TX Streets/Roads Auburn
(Main
to
10th) 










1,160,000
 35
McAllen TX Streets/Roads Dove
(41st
to
Bentsen) 










1,400,000
 40
McAllen TX Streets/Roads Bridge
replacements
along
Bicentennial
Ditch
and
Ditch
Regrading 










4,208,000
 50
McAllen TX Streets/Roads Pavement
Recycling
(46
miles
Mill
and
Overlay
and
5
miles
full
depth
repair) 








11,820,000
 60
McAllen TX Streets/Roads Turn
Lanes,
Signaliza3on,
Median,
Signage,
Delineators,
and
Other
Traffic
Devices
to
Improve
Traffic
Flow
and

Increase
Safety
at
Various
Loca3ons
Througout
the
City. 












598,000
 90
McAllen TX Streets/Roads Bentsen
Road 








13,000,000
 100
McAllen TX Streets/Roads Bicentennial
Road 








13,000,000
 100
McAllen TX Transit Part
3me
Recep3onist 














10,000
 0
McAllen TX Transit Office
&
Common
area
Furniture
for
Bus
Terminal 














30,000
 1
McAllen TX Transit Transit
GIS
Planner 














40,254
 1
McAllen TX Transit Office
&
Common
Area
Furniture
for
Bus
Terminal 














30,000
 1.05
McAllen TX Transit Electronic
Informa3onal
Displays
(6@
$7,000) 














42,000
 1.47
McAllen TX Transit 3
Administra3on
Vehicles 














45,000
 1.58
McAllen TX Transit Bus
Terminal
Signage
(Interior
&
Exterior) 














55,000
 1.93
McAllen TX Transit 3
Administra3on
Vehicles 














45,000
 2
McAllen TX Transit Purchase
and
Installa3on
of
Bus
Shelters 














60,000
 2
McAllen TX Transit Marke3ng
Campaign 












100,000
 4
McAllen TX Transit Purchase
2
Vans
for
Paratransit
Service 












145,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
McAllen TX Transit Purchase
2
Vans
for
Paratransit
Service 












145,000
 5.08
McAllen TX Transit Conven3on
Center
Route 












275,000
 9.63
McAllen TX Transit Express
Route 












275,000
 9.63
McAllen TX Transit Express
Route 












275,000
 10
McAllen TX Transit University
Circulator
Route 












300,000
 10
McAllen TX Transit Purchase
1
Rolling
Stock
‐
Implement
new
Express
Route 










3,000,000
 10.5
McAllen TX Transit Construc3on
of
Parking
Lot
for
Bus
Terminal 












400,000
 14
McAllen TX Transit Parking
Lot
Improvements
for
Bus
Terminal 












400,000
 14
McAllen TX Transit Purchase
and
Installa3on
of
4
Solar
Powered
A/C
Shelters 












580,000
 20.3
McAllen TX Transit Service
Hour
Expansion 












580,000
 20.3
McAllen TX Transit Service
Expansion
(through
10
pm
daily
&
Sunday
10
am
‐
7
pm) 












700,000
 24
McAllen TX Transit Purchase
5
30b
Transit
Buses
Medium
Duty 










1,025,000
 35.88
McAllen TX Transit Pedestrian
Walkway/Canopies 










1,200,660
 42
McAllen TX Transit Pedestrian
Walkway/Canopies 










1,200,660
 42.02
McAllen TX Transit Purchase
4
Hybrid
Buses 










2,000,000
 70
McAllen TX Transit Purchase
of
Rolling
Stock
(12
buses) 










4,200,000
 147
McAllen TX Water 3,000
L.F.
of
54"
Pipeline
for
N.
Water
Plant 










1,000,000
 5
McAllen TX Water 4
MGD
expansion
to
N.
Water
Treatment
Pl. 










5,000,000
 5
McAllen TX Water 3,000
L.F.
of
48"
Pipeline
for
new
Reservoir 












750,000
 8
McAllen TX Water 6th
and
Mar3n
Lib
Sta3on
Replacement 












750,000
 10
McAllen TX Water Colbath
Avenue
Lib
Sta3on
Replacement 












750,000
 10
McAllen TX Water De‐watering
facili3es
at
SW.
Water
Plant 










1,500,000
 10
McAllen TX Water Lib
Sta3on
Replacement
at
2nd
&
Jonquil.

The
project
replaces
a
failing
lib
sta3on
and
will
improve
air
quality

through
treatment
and
removal
of
hydrogen
sulfide.

Construc3on
will
take
6
months
to
complete
in
2009. 












790,000
 10
McAllen TX Water 13,000
L.F.
of
60"
Pipeline
for
New
Reservoir 










5,000,000
 25
McAllen TX Water Reservoir
Pipeline 








14,000,000
 100
McAllen TX Water Wastewater
Treatment
Plant
Expansion
from
6
to
18
million
gallons
per
day
capacity.

The
project
will
improve

quality
of
treated
wastewater
and
biosolids,
eliminate
use
of
hazardous
chlorine
gas,
incorporate
a
more

energy
efficient
process.

Construc3on 








40,000,000
 125
McKinney TX CDBG Housing
Rehab
Grant 










1,000,000

McKinney TX Energy Green
Coordinator 












120,000
 1
McKinney TX Energy Exis3ng
Building
Retrofiqng 










1,000,000
 30
McKinney TX Housing Sec3on
8
Apartment
Rehab 










3,000,000
 50
McKinney TX Public
Safety School
Resource
Officers 












250,000
 2
McKinney TX Public
Safety Public
Safety
Building
Phase
1A
‐
New
Detec3ve
Office
Space
&
Building
Parking
Area
(50
construc3on
+
13

ongoing
jobs) 












550,000
 63
McKinney TX Public
Safety Public
Safety
Building
Phase
2
‐
25,000
sf
building
for:
ppty
evdnc,
crime
lab,
canine
kennels,
crime
vehicle
strg,

expnd'd
SWAT
eqpmt
strg
(75
+
5
ongoing
jobs) 










5,000,000
 80
McKinney TX Public
Safety Fire
Sta3on
#9
‐
North
(200
+
18
ongoing
jobs) 










6,000,000
 218
McKinney TX Public
Safety Fire
Sta3on
#8
‐
Craig
Ranch
18,000
sf
5‐bay
(200
+
21
ongoing
jobs) 








10,000,000
 221
McKinney TX Streets/Roads CIP
Roadways 












598,000
 50
McKinney TX Transit CCART/small
bus
funding 












500,000

McKinney TX Water CIP
Water/Sewer 










5,000,000
 100
Mesquite TX Streets/Roads Alley
Reconstruc3on
Project 










3,000,000
 0
Mesquite TX Streets/Roads Casa
View
Sidewalk
Rehabilita3on
Project 












290,000
 0
Mesquite TX Streets/Roads Dribwood
Drive
Extension 










1,000,000
 0
Mesquite TX Streets/Roads Lawson/Shannon/Lumley 










1,500,000
 0
Mesquite TX Streets/Roads Street
Light
Replacement
Project 










1,000,000
 0
Mesquite TX Streets/Roads Town
East
Boulevard
Concrete
Replacement
Project 










2,000,000
 0
Mesquite TX Streets/Roads Traffic
Signal
Improvements 










1,500,000
 0
Mesquite TX Water Edgemont
Park
Phase
4
Water
Line
Replacement
Project 










1,000,000
 0
Mesquite TX Water Northridge
Sanitary
Sewer
Rehabilita3on
Project 










4,000,000
 0
Mesquite TX Water South
Mesquite
Creek
Sanitary
Sewer
Trunk
Main
Replacement 










8,000,000
 0
Missouri
City TX CDBG Sidewalk
Replacement
Program
to
increase
and
encourage
pedestrian
traffic. 












900,000
 10
Missouri
City TX CDBG Animal
Shelter
Renova3on
to
increase
the
capacity
and
bring
the
building
up
to
code. 












500,000
 15
Missouri
City TX Energy LED
Street
Light
Upgrade
Program
to
increase
energy
efficiency
and
reduce
opera3onal
costs. 










1,000,000
 10
Missouri
City TX Public
Safety COPS
‐
2
addt'l
officers 












100,000
 2
Missouri
City TX Streets/Roads Field
Crest
Street
Reconstruc3on 










1,325,807
 20
Missouri
City TX Streets/Roads Independence
Boulevard
Extension 










1,650,000
 20
Missouri
City TX Streets/Roads Turtle
Creek
Street
Reconstruc3on 










2,375,550
 20
Missouri
City TX Transit Transit
&
Light
Rail
Study 












500,000
 10
Missouri
City TX Water Construct
a
hydro
pneuma3c
tank
and
storage
tank
in
the
Mustang
Bayou
Regional
Water
Plant 










2,000,000
 15
Missouri
City TX Water Expansion
of
exis3ng
Vicksburg
Joint
Powers
WWTP
from
500,000
GPD
to
950,000
GPD. 










2,500,000
 25
Missouri
City TX Water Steep
Bank/Flat
Bank
WWTP
Expansion
from
1.5
to
3.0
MGD 










4,000,000
 25
North
Richland
Hills TX CDBG Housing
Rehabilita3on 












122,000
 15
North
Richland
Hills TX CDBG Street
Reconstruc3on‐Harmonson
Road
(Dawn
Drive
East
to
Creek) 












999,424
 20
North
Richland
Hills TX CDBG Water
Main
Replacement‐Onyx
Drive
North
(Onyx
Drive
North
West
to
Big
Fossil
Creek) 












157,500
 20
North
Richland
Hills TX Energy Fire
Department
Vehicles
Shoreline
Power‐
install
shoreline
power
at
the
fire
training
facility
to
eliminate
idling

for
electrical
equipment. 















9,000
 3
North
Richland
Hills TX Energy Automa3c
ligh3ng
controls 














22,000
 10
North
Richland
Hills TX Energy De‐lamp
City
Buildings 














49,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
North
Richland
Hills TX Energy Solar
Panel
Project‐Install
62
solar
panels
on
patrol
and
off
road
equipment
to
reduce
onboard
electric
bafery

chargers. 














14,384
 10
North
Richland
Hills TX Energy Window
Replacement 














80,000
 10
North
Richland
Hills TX Energy HVAC
Central
Control 












378,000
 20
North
Richland
Hills TX Energy HVAC
Replacement 












111,000
 20
North
Richland
Hills TX Energy Re‐roofing 












560,000
 25
North
Richland
Hills TX Public
Safety Regional
Public
Safety
Training
Facility‐Build
a
police/fire
training
facility
that
would
give
much
needed
training

access
to
area
agencies. 










3,000,000

North
Richland
Hills TX Public
Safety Youth
Summer
Camp‐Work
with
"at‐risk"
children
in
interac3ve
camp
with
local
leaders 














10,000
 0.5
North
Richland
Hills TX Public
Safety Explorer
Post‐
develop
leadership
ability
in
teenagers
by
leqng
them
explore
the
police
field. 














35,000
 1
North
Richland
Hills TX Public
Safety Family
Resource
Coordinator‐
create
a
posi3on
that
works
with
at
risk
families
of
abuse
and
neglect.

The
FRC

will
council
and
assist
these
families
through
short
term
interven3on. 














45,000
 1
North
Richland
Hills TX Public
Safety Volunteer
Patrol‐Volunteers
respond
to
non‐police
mafers
and
act
as
"eyes
and
ears"
on
the
street.

Help

decrease
3me
because
officers
could
respond
to
crime. 














51,000
 1
North
Richland
Hills TX Public
Safety City
Wide
Surveillance
Camera
Project‐
Install
cameras
in
areas
of
higher
rates
of
crime
and
city
property. 










3,500,000
 5
North
Richland
Hills TX Streets/Roads North
Tarrant
Express‐Improving
Loop
820
within
North
Richland
Hills
city
limits 






600,000,000
 600
North
Richland
Hills TX Streets/Roads Various
streets
throughout
the
City
that
require
complete
reconstruc3on 








22,991,050
 660
North
Richland
Hills TX Water Sanitary
Sewer
Main
Replacement‐
Various
Loca3ons
Throughout
the
City 








21,348,866
 300
North
Richland
Hills TX Water Water
Main
Replacement‐
Various
Loca3ons
Throughout
City 








24,145,580
 320
Pharr TX CDBG Centennial
Plaza 












200,000
 12
Pharr TX CDBG Old
Fire
Sta3on
Museum 










1,750,000
 106
Pharr TX Public
Safety Public
Safety
Radio
System 










9,000,000
 20
Pharr TX Streets/Roads STEP
‐
"Railroad
Heritage
Park" 










2,200,000
 130
Pharr TX Streets/Roads STEP
‐
"Farm
to
Market"
Museum 










2,600,000
 160
Pharr TX Streets/Roads STEP
‐
"Pedestrian
Mobilty
&
Safety
Improvements" 










8,200,000
 500
Port
Aransas TX Airport Mustang
Beach
Airport
improvement 








10,000,000
 100
Port
Aransas TX Energy Gas
Department
energy
retrofit 














25,000
 0
Port
Aransas TX Energy Community
Cener
energy
retrofit 














50,000
 1
Port
Aransas TX Energy Library
energy
retrofit 














50,000
 1
Port
Aransas TX Energy Police/EMS/Court
Building
energy
retrofit 












100,000
 2
Port
Aransas TX Energy Civic
Center/City
Hall
energy
retrofit 












200,000
 4
Port
Aransas TX Public
Safety Addi3onal
police
officers 












300,000
 4
Port
Aransas TX Schools Update
computer
labs
and
servers 














25,000
 0
Port
Aransas TX Schools Retrofit
buildings
for
energy
efficiency 














75,000
 1
Port
Aransas TX Transit Park
and
Ride
facili3es
‐
Ferry,
Harbor
Island 












250,000
 2
Port
Aransas TX Transit Fuel‐efficient
trolleys
and
buses 












500,000
 5
Port
Aransas TX Water Energy‐efficient
natural
gas
power
system
for
wastewater
plant
and
line 










2,000,000
 20
Port
Aransas TX Water Enlarge
water
line
from
San
Patricio
water
district
for
all
Mustang
Island 










8,000,000
 80
Rowlef TX CDBG Delia
Street
paving,
drainage
and
waterline
improvements 












726,000
 10
Rowlef TX Energy 5
Wind
Driven
Turbine/Generator
Systems 












300,000
 20
Rowlef TX Public
Safety Community
Policing
Project:
Project
consists
of
five
(5)
addi3onal
patrol
officers,
two
(2)
neighborhood
police

officers
and
one
(1)
crime
analyst
with
associated
equipment
and
personnel
compensa3on
to
conduct

community
policing
projects
to
include
neig 












834,796
 8
Rowlef TX Streets/Roads Merrif/Liberty
Grove
Road
Interconnector
‐
Six‐lane
divided
roadway
from
Merrif
Road
to
the
President

George
Bush
Turnpike. 








33,000,000
 20
Rowlef TX Water Rowlef
Road
12"
Waterline 












800,000
 4
Rowlef TX Water Main
Street
Lib
Sta3on 










1,120,000
 6
Rowlef TX Water Rowlef
Road
Lib
Sta3on 










1,713,000
 6
Rowlef TX Water Princeton
Road
24"
Waterline 










2,000,000
 8
Rowlef TX Water Kenwood
Heights
water
and
sanitary
sewer
improvements. 










3,000,000
 10
San
Antonio TX Airport Provide
infrastructure
support
for
the
Airport
Emergency
Opera3ons
Center
(AEC)
 












150,000
 5
San
Antonio TX Airport Part
150
‐
Limited
Noise
Compa3bility
Study 












100,000
 7
San
Antonio TX Airport Parking
Revenue
Control
System












8,000,000
 10
San
Antonio TX Airport Develop
and
install
a
Wide
Area
Network
(Wireless
Mesh)
infrastructure
to
provide
interoperable
and

redundant
communica3ons
to
federal,
state
and
local
emergency
responders
during
natural
and
man‐made

disasters
and
terrorist
afacks. 










2,571,000
 14
San
Antonio TX Airport S3nson
Airport
Obstruc3on
Clearing 












450,000
 25
San
Antonio TX Airport Environmental
Remedia3on
(Apron
Construc3on) 












500,000
 40
San
Antonio TX Airport Repair
Airport
Perimeter
Road 










1,400,000
 40
San
Antonio TX Airport Construct
a
mul3‐use,
infec3ous
disease
quaran3ne
and
training
facility
on
San
Antonio
Interna3onal
Airport

property
to
isolate
ill
or
poten3ally
ill
airline
passengers
in
order
to
maintain
the
con3nuity
of
airport

opera3ons
while
the
isolated
indi 










4,000,000
 45
San
Antonio TX Airport Taxiway
Romeo
Charlie
Extension 










4,100,000
 100
San
Antonio TX Airport Construc3on
of
New
Airport
Terminal
C 






125,000,000
 500
San
Antonio TX CDBG Alamodome
Improvements
and
Repairs 








10,000,000

San
Antonio TX CDBG BRAC
Road
Improvements 








42,000,000

San
Antonio TX CDBG Central
Library
Modernaza3on/Expansion 








75,000,000

San
Antonio TX CDBG Conven3on
Center
Expansion/Improvements
Phase
I 






200,000,000

San
Antonio TX CDBG Downward
Ligh3ng
Retrofits
around
Camp
Bullis 












500,000

San
Antonio TX CDBG Ini3al
Development
of
Crystal
Hills
Park 










3,000,000

San
Antonio TX CDBG Inter‐City
Branch
Library
Renova3on/Expansion 








15,000,000

City State Program Project
Descrip3on Funding
Required Jobs
San
Antonio TX CDBG Mission
Drive‐In
Library 










6,000,000

San
Antonio TX CDBG OP
Schnabel
Park
second
entrance
 










1,500,000

San
Antonio TX CDBG Sunken
Garden
Park
Project 










2,000,000

San
Antonio TX CDBG Renova3ons
at
the
Lifle
Carver
Cultural
Center 














10,000
 5
San
Antonio TX CDBG Low
Water
Crossing
Improvements 












535,000
 7
San
Antonio TX CDBG Improvements
of
the
Carver
Community
Cultural
Center 












250,000
 10
San
Antonio TX CDBG Improvements
to
the
Carver
Annex
 












200,000
 10
San
Antonio TX CDBG Crea3on
of
a
new
5,000
SF
senior
mul3‐purpose
service
center 










2,000,000
 20
San
Antonio TX CDBG Increase
the
size
of
three
Community
Centers
including
the
crea3on
of
career
centers/labs
comprised
of
21

computers
and
kiosks. 










1,300,000
 43
San
Antonio TX CDBG Voelcker
Park
Trail
System 










5,000,000
 50
San
Antonio TX CDBG Moderniza3on
and
improvement
of
eight
Community
Family
Resource
and
Learning
Centers
and
three

Community
Centers
(HVAC,
roofing,
ligh3ng,
flooring,
pain3ng,
soundproofing) 












908,000
 100
San
Antonio TX CDBG Park
Projects 










7,250,000
 106
San
Antonio TX CDBG City
wide
Sidewalks
Improvements 








10,766,220
 158
San
Antonio TX CDBG Crea3on
of
four
new
10,000
SF
senior
mul3‐purpose
service
centers 








20,000,000
 168
San
Antonio TX CDBG Haven
for
Hope
Homeless
Campus
‐Child
Care
Center,Women's
and
Family
Dorm 








10,900,000
 220
San
Antonio TX CDBG Construct
a
new
Public
Safety
Answering
Point
(PSAP) 








10,000,000
 350
San
Antonio TX CDBG City
Wide
Street
Impovements 








63,518,743
 935
San
Antonio TX CDBG Traffic
Signal
(Wood
Pole
Conversions) 








81,250,000
 1196
San
Antonio TX Energy The
Independence,
An3‐idling
Package
by
Xtreme
Energy—
To
be
installed
on
14
Airport
Police
vehicles 














91,000
 2
San
Antonio TX Energy Trailer‐mounted
Microgrid 












350,000
 6
San
Antonio TX Energy 500
kW
solar
array
at
the
south
end
of
Terminal
One
short‐term
parking 










5,000,000
 10
San
Antonio TX Energy Cri3cal
Fuel
Infrastructure 










1,000,000
 10
San
Antonio TX Energy Henry
B.
Gonzales
Conven3on
Center
Solar
PV
Array 










4,000,000
 10
San
Antonio TX Energy Ligh3ng
Retrofits
for
City‐Owned
Facili3es 










1,200,000
 16
San
Antonio TX Energy Solar
Shade
Ini3a3ve 










4,000,000
 30
San
Antonio TX Energy Tree
Plan3ng
Ini3a3ve—200,000
trees
planted
in
public
property
for
the
following
purposes:
shading
of
heat

affected
public
buildings,
parking,
and
roads;
improved
storm
water
management
in
high
runoff
and
ponding

loca3ons;
visual
screening;
air
qualit 








10,000,000
 30
San
Antonio TX Energy Traffic
Signal
System
Moderniza3on 








14,500,000
 38
San
Antonio TX Energy Pay
as
You
Save
(PAYS)
Green
Retrofit
Program 










4,000,000
 100
San
Antonio TX Public
Safety Digital
Imagery
Capture
and
Storage 












570,000

San
Antonio TX Public
Safety Downtown
Bicycle
Patrol
Office






Rental,
Finish‐out,
furniture,
computers,







Bicycle
storage,
etc. 












240,000

San
Antonio TX Public
Safety In
car
Video
Equipment 










1,300,000

San
Antonio TX Public
Safety Mobile
Computer
Replacement
(
Patrol
Vehicles) 










4,485,000

San
Antonio TX Public
Safety Mounted
Horse
Patrol
Unit






Horses,
Stables,
Tack,
Equipment,
Feed,
Vet 












450,000

San
Antonio TX Public
Safety Patrol
Vehicles,
including
motorcycles 










7,534,800

San
Antonio TX Public
Safety Storefront
Police
Facili3es
(
2)






Rental,
Finish‐out,
computers,
furniture 












280,000

San
Antonio TX Public
Safety 















COPS
Funds‐Hire
50
new
police
officers 










1,750,000
 50
San
Antonio TX Streets/Roads 

Low
Water
Crossing
Imrprovements 










1,649,212
 24
San
Antonio TX Streets/Roads 

Alley
Maintenance 










4,000,000
 60
San
Antonio TX Streets/Roads 

Sidewalk
Improvements 










7,003,243
 103
San
Antonio TX Streets/Roads 

ADA
(Downtown) 








10,000,000
 147
San
Antonio TX Streets/Roads 

Intersec3on
Improvements 








12,438,331
 183
San
Antonio TX Streets/Roads 
Citywide
Bridge
Program 








20,000,000
 295
San
Antonio TX Streets/Roads 

Signalized
Intersec3on
Equipment
Upgrades 








30,330,000
 447
San
Antonio TX Streets/Roads 

Traffic
Signals
(Wood
Pole
Conversions) 








60,750,000
 895
San
Antonio TX Streets/Roads 

City
Wide
Streets
Improvements 








88,600,000
 2335
San
Antonio TX Water San
Antonio
River
Improvements
Project,
s3mulus
funding
would
allow
for
comple3on
of
the
en3re
Phase
II

por3on
of
the
project. 








50,000,000
 200
Tyler TX Public
Safety Police
Personnel
Project 












500,000
 10
Waco TX Airport Waco
Regional
Airport
Runway
Safety
Areas 












450,000
 10
Waco TX CDBG Pedestrian
Safety(sidewalks) 










1,000,000
 20
Waco TX CDBG Webster
&
Cross
Roads
Drainage 










1,000,000
 20
Waco TX CDBG Sul
Ross
Park
Redevelopment 










3,000,000
 30
Waco TX CDBG US
84
Hike
&
Bike
Trail
Bridge 










2,000,000
 40
Waco TX CDBG Mammoth
Site,
Phase
2 










6,000,000
 60
Waco TX CDBG Dewey
Recrea3on
Center 










7,500,000
 80
Waco TX Public
Safety Police
Firing
Range 










2,000,000
 30
Waco TX Public
Safety Public
Safety
Radio
System
Repalcement 










8,000,000
 30
Waco TX Public
Safety Fire
Sta3on
Construc3on
at
four
loca3ons 










9,500,000
 70
Waco TX Streets/Roads Ritchie
Road‐RR
to
Warren 










2,000,000
 40
Waco TX Streets/Roads Loop
574‐I35
to
SH6 








20,000,000
 300
Waco TX Transit ADA
&
Medicare
Scheduling
Sobware 












155,000
 1
Waco TX Transit 10
Paratransit
vans 












520,000
 5
Waco TX Transit 15
ADA
vans 










1,425,000
 10
Waco TX Water Central
Texas
Water
Reclama3on 










7,000,000
 100
City State Program Project
Descrip3on Funding
Required Jobs
Waco TX Water Regional
Wastewater
Infrastructure 








10,000,000
 150
Winnsboro TX Airport Airport
Terminal
Update
and
Technology 












300,000
 5
Winnsboro TX Airport Expand
Airport
Road
to
Wide
Two
Lane
or
4‐Lanes 










1,000,000
 5
Winnsboro TX Airport Update
all
Community
facili3es
to
clean
or
energy
efficient
energy 










3,000,000
 10
Winnsboro TX Airport Development
of
Infrastructre
of
Industrial
Land
Adjacent
to
Airport 










5,000,000
 30
Winnsboro TX Airport Runway
Extension
for
Airport 










4,000,000
 30
Winnsboro TX CDBG City
Maintenance
Equipment
‐
Backloader 














65,000
 1
Winnsboro TX CDBG Community
Development
Assistant 












100,000
 1
Winnsboro TX CDBG Skateboard
Park
Facility 












200,000
 1
Winnsboro TX CDBG Community
Founda3on
Seed
Money
to
fund
projects
of
$50,000
+
per
year
indefinitely 










1,000,000
 2
Winnsboro TX CDBG Park
Development 












500,000
 2
Winnsboro TX CDBG African
American
and
Regional
Cultural
Museum 












300,000
 3
Winnsboro TX CDBG Art
District
Enhancements 












350,000
 3
Winnsboro TX CDBG Documentary
of
Projects
Developed
(Photography,
Video,
Wrifen
Format,
etc.) 












180,000
 3
Winnsboro TX CDBG Master
plan
Update 












100,000
 3
Winnsboro TX CDBG Workforce
Training
Center 










2,000,000
 5
Winnsboro TX CDBG Arts
park
/
Farmers
Market 










1,000,000
 6
Winnsboro TX CDBG Develop
City
Wide
Free
or
near
Free
Internet
System
‐
Wireless 












250,000
 7
Winnsboro TX CDBG Tourism
Marke3ng 












250,000
 7
Winnsboro TX CDBG Spray
Park
Installa3on 












600,000
 8
Winnsboro TX CDBG VFW
Facili3es
Enhancements 












200,000
 8
Winnsboro TX CDBG Neighborhood
Center 










2,500,000
 10
Winnsboro TX CDBG Rodeo
Grounds
Development
‐
New 












300,000
 10
Winnsboro TX CDBG Senior
Center
Enhancements 












250,000
 10
Winnsboro TX CDBG City
Mural
Projects 










1,000,000
 20
Winnsboro TX CDBG Downtown
development
and
enhancements 










5,000,000
 20
Winnsboro TX CDBG Medical
Facili3es
Expansions 










5,000,000
 20
Winnsboro TX CDBG New
City
Hall
with
Solar
Power 










3,000,000
 20
Winnsboro TX CDBG Non‐Profit
Facili3es,
Enhancements,
and
Opera3ons 










2,000,000
 20
Winnsboro TX CDBG Recrea3ons
Park 










2,000,000
 20
Winnsboro TX CDBG Development/Purchase
of
60
Acre
Industrial
Land 












750,000
 30
Winnsboro TX CDBG Streets
and
Sidewalks 










4,000,000
 30
Winnsboro TX CDBG Medical
Park
Development 










5,000,000
 35
Winnsboro TX CDBG Increase
City
Staff
Capacity
if
Package
is
Passed 










4,000,000
 50
Winnsboro TX CDBG Restora3on
of
Historical
Buildings 










5,000,000
 100
Winnsboro TX CDBG Business
Loans
‐
Revolving
Funds 










2,000,000
 133
Winnsboro TX CDBG Incen3ves
for
non‐pollu3ng
Industries
to
Locate
in
Area 










6,000,000
 1000
Winnsboro TX Energy Fiqng
Art
Center
to
be
Energy
Efficient 












750,000
 5
Winnsboro TX Energy Residen3al
and
Business
Incen3ves
to
Retrofit
facili3es
to
clean
energy 










2,000,000
 20
Winnsboro TX Energy Pending
Recruitment
of
Windmill
Produc3on
Company 








12,000,000
 24
Winnsboro TX Housing Fix
Flood
Zone
Gufering 










5,000,000
 15
Winnsboro TX Housing Funds
to
S3mulate
and
Incen3vize
New
Apartments
and/or
Homes 










2,000,000
 15
Winnsboro TX Housing Funds
for
Sub‐housing
Replacement 










5,000,000
 20
Winnsboro TX Public
Safety City
Vehicles 












120,000

Winnsboro TX Public
Safety Purchase
of
Tasers 














20,000

Winnsboro TX Public
Safety Update
Weather
Warning
System 












200,000

Winnsboro TX Public
Safety Full
Time
Director
for
Drug
Task
Force 












180,000
 2
Winnsboro TX Public
Safety Animal
Shelter
Expansion 












500,000
 4
Winnsboro TX Public
Safety At‐Risk
Youth
Development
Program
and
Assistance 












600,000
 4
Winnsboro TX Public
Safety New
Fire
Sta3on 










1,000,000
 5
Winnsboro TX Public
Safety Retrofit
City
Vehicles
for
Clean
Energy 










1,000,000
 5
Winnsboro TX Public
Safety Increase
Police
Force 












800,000
 7
Winnsboro TX Public
Safety Women's
Drug
Rehab
Enhancements 










2,000,000
 7
Winnsboro TX Public
Safety Visitor
Informa3on
Center 










2,000,000
 10
Winnsboro TX Public
Safety Development
of
Mens
Rehab
Center 










4,000,000
 12
Winnsboro TX Schools Classroom
Technology 










1,000,000

Winnsboro TX Schools Business
Incubator
Developmnet 










1,000,000
 20
Winnsboro TX Schools Restora3on
of
or
new
development
of
all
school
buildings 








10,000,000
 150
Winnsboro TX Streets/Roads Way
finding
Signage 












100,000

Winnsboro TX Streets/Roads Conversion
to
LED
Stop
Lights 














10,000
 0
Winnsboro TX Streets/Roads 12
Passenger
Van
to
Transport
Seniors 












100,000
 1
Winnsboro TX Streets/Roads Tree
Plan3ng
and
Beau3fica3on 












100,000
 1
Winnsboro TX Streets/Roads City
Employees
or
Contactors
Dedicated
to
City
Cleanup 












200,000
 3
Winnsboro TX Streets/Roads Streetscape 












500,000
 3
Winnsboro TX Streets/Roads Downtown
Parking
Expansion 












500,000
 5
Winnsboro TX Streets/Roads Alleyway
Replacement 










1,000,000
 8
Winnsboro TX Streets/Roads Bicycle
/
Walking
Trail 










1,000,000
 10
Winnsboro TX Streets/Roads Transplant
Overhead
Powerlines
to
Underground 










4,000,000
 15
Winnsboro TX Transit County
Wide
Public
Transit
System 










5,000,000
 10
Winnsboro TX Transit Rail
Spur
Restora3on
to
Industrial
Land 










2,000,000
 60
City State Program Project
Descrip3on Funding
Required Jobs
Winnsboro TX Water Extend
Waterlines
City
Wide 












350,000
 4
Brigham
City UT Airport Airport
Taxiway 










1,500,000
 12
Brigham
City UT CDBG 400
N.
Bridge
Replacement 












400,000
 2
Brigham
City UT CDBG 200
S.
Traffic
Calming 












200,000
 10
Brigham
City UT CDBG Compost
Facility
Transfer
Sta3on
&
Recycling
Center 








24,000,000
 18
Brigham
City UT CDBG Sports
Park 








15,000,000
 33
Brigham
City UT CDBG City
Hall
&
Public
Safety
Building 








15,000,000
 34
Brigham
City UT CDBG Academy
Square
Project 








20,000,000
 42
Brigham
City UT CDBG Comple3on
of
an
open‐access
fiber
op3c
telecommunica3on
network
in
partnership
with
15
other
Utah
citeis.











5,982,685
 119
Brigham
City UT Streets/Roads Main
Street
Sidewalk
Rehavilita3on
&
Irriga3on
project
(downtown) 












700,000
 10
Brigham
City UT Streets/Roads Sidewalks
en3re
town 










4,700,000
 26
Brigham
City UT Streets/Roads 1200
W.
Forest
to
1100
S. 










8,300,000
 27
Brigham
City UT Transit Trail
System 










2,800,000
 20
Brigham
City UT Water Waste
Treatment
Plant
Telemetry
Upgrade 












240,000
 4
Brigham
City UT Water Waterline
‐
1200
W.
6
N.
to
Forest
St. 












550,000
 6
Brigham
City UT Water 2
million
gallon
north
end
concrete
water
storage
reservoir 










2,200,000
 8
Brigham
City UT Water Piping
Cement
Ditch
‐
Mantua
Reservoir 










3,100,000
 14
Brigham
City UT Water Water
Radio
Read
Meters,
Service
Replacement,
Security
&
Telemetry 










2,600,000
 19
Herriman UT CDBG REMEDIATION
OF
CONTAMINATED
SOIL 










2,500,000
 18
Herriman UT Energy New
City
Hall 








12,000,000
 100
Herriman UT Streets/Roads 6000
WEST
WIDENING 










1,300,000
 12
Herriman UT Streets/Roads MIDAS
CREEK
BRIDGE 












750,000
 12
Herriman UT Streets/Roads 5600
WEST
PROJECT 










2,500,000
 20
Herriman UT Streets/Roads 13400
SOUTH
WIDENING 










2,000,000
 25
Herriman UT Streets/Roads HERRIMAN
PARKWAY
EXTENSION 










4,000,000
 32
Herriman UT Streets/Roads SOUTH
HILLS
BOULEVARD 










5,000,000
 35
Herriman UT Water REGIONAL
DETENTION
POND 












800,000
 10
Herriman UT Water MAIN
STREET
WATERLINE
&
PUMP
STATION 










2,000,000
 16
Herriman UT Water PRESSURIZED
IRRIGATION
PIPELINE 










3,500,000
 18
Herriman UT Water 16"
WATERLINE
TO
TANK 










1,800,000
 20
Herriman UT Water 5
MILLION
GALLON
WATER
TANK 










4,500,000
 34
Holladay UT CDBG Midblock
Roadway
‐
Holladay
Village
Commercial
Area
Development. 












890,000
 17
Holladay UT Energy "Cofonwood
Loop"
Street
Ligh3ng
Upgrade
‐
Replace
approx
120
incandescent
street
light
fixtures
on

an3quated
series
loop
with
new
LED
fixtures. 












125,000
 3
Holladay UT Streets/Roads Kentucky
Avenue
and
Holladay
Blvd.
Intersec3on
Reallignment 












300,000
 10
Holladay UT Streets/Roads Holladay
Village
(downtown)
Roadway
Reconstruc3on
Supplemental
Funding
to
complete
project.

Work

inlcudes
roadway
reconstructoin,
powerline
buriel,
soils
contamina3on
mi3ga3on,
streetscape,
and
other

incidentals. 










1,500,000
 15
Holladay UT Streets/Roads city‐wide
streets
‐
pavement
rehabilita3on 










5,000,000
 35
Holladay UT Water Wren
Hollow
Flood
Control
/
Storm
Drain
Project 














85,000
 1
Holladay UT Water Wayman
Storm
Drain
Phase
II
‐
Casto
Lane
Extension
/
Irriga3on
Separa3on 












400,000
 4
Holladay UT Water Upper
Canal
Regional
Flood
Control
Facili3es
‐
Bank
Stabiliza3on
‐
Flood
control
structures,
and
related
work 












550,000
 5
Holladay UT Water Indian
Rock
Storm
Drain
/
Irriga3on
Separa3on 












700,000
 7
Murray UT CDBG 4800
South
Street
improvements 














33,000
 5
Murray UT CDBG Storm
Sewer
project
at
5490
S.
Vine
Street 














56,100
 5
Murray UT CDBG Edison
Street
Improvements 












225,000
 10
Murray UT CDBG Sewer
line
replacement
on
300
West
from
4650
South
to
4500
South 












250,000
 10
Murray UT CDBG Sewer
line
replacement
on
Edison
St.
from
State
to
Main
Street 












153,000
 10
Murray UT CDBG Storm
Sewer
project
on
Fairbourne
Avenue 












194,000
 10
Murray UT CDBG Water
line
improvements
on
Alpine
Dr.
from
5300
South
to
Knollcrest
Dr. 












196,290
 10
Murray UT CDBG Water
line
improvements
on
Avalon
Dr.
from
5300
South
to
5600
South 












349,650
 10
Murray UT CDBG Water
line
improvements
on
Edison
St.
from
State
St.
to
Main
St. 












158,000
 10
Murray UT CDBG Water
line
improvements
on
Fireclay
Ave.
from
State
St.
to
Main
St. 












172,000
 10
Murray UT CDBG Water
line
improvements
on
Kenwood
Dr.
Avalon
to
Avalon 












265,000
 10
Murray UT CDBG Water
line
improvements
on
Montrose
from
5300
South
to
Alpine
Dr. 












119,205
 10
Murray UT Energy Landfill
gas
project
with
TransJordan
Landfill
to
produce
between
4
to
7
megawafs
of
power
as
a
24/7
green

resource.

Infrastructure
to
provide
power
to
the
grid
and
to
city
power
department
for
distribu3on. 












500,000
 3
Murray UT Streets/Roads 4800
South 










1,605,450
 10
Murray UT Streets/Roads 5900
South 










3,675,488
 20
Murray UT Water State
Street
Sewer
Line 












875,000
 20
Murray UT Water State
Street
Waterline 










1,726,775
 20
Orem UT CDBG Timpanogos
Park
Facility
Improvements 












800,000
 25
Orem UT CDBG Public
Facili3es
‐
Educa3on
Resources
Building 










1,200,000
 40
Orem UT CDBG Business
Incubator 










2,000,000
 50
Orem UT CDBG Curb,
Gufer
&
Sidewalk
Improvements 












600,000
 60
Orem UT CDBG ED‐
For‐Profit/Job
Crea3on 










2,500,000
 70
Orem UT CDBG City
Center
Infrastructure
Improvements 










9,400,000
 165
Orem UT CDBG Library
Infrastructure
Improvements 










9,000,000
 275
Orem UT CDBG Community
Telecommunica3ons
System 








40,000,000
 400
City State Program Project
Descrip3on Funding
Required Jobs
Orem UT Public
Safety Install
cameras
‐‐
72
cameras
installed,
one
per
intersec3on,
between
500
West
to
200
East
and
200
North
to

600
South.

$10,000
per
camera
includes
installa3on,
maintenance.

7
officers
to
operate. 










1,216,000
 7
Orem UT Streets/Roads Fiber
Op3c
Installa3on 












300,000
 50
Orem UT Streets/Roads Intersec3on
Improvements
at
University
Parkway
&
800
East 












350,000
 75
Orem UT Streets/Roads Add
Right‐turn
Lanes
at
400
South
&
Orem
Boulevard 












450,000
 100
Orem UT Streets/Roads Add
Right‐turn
Lanes
at
800
South
&
Orem
Boulevard 












950,000
 100
Orem UT Streets/Roads New
Traffic
Signal
1200
North
&
1200
West 












500,000
 100
Orem UT Streets/Roads New
Traffic
Signal
1200
North
&
800
West 












500,000
 100
Orem UT Streets/Roads New
Traffic
Signal
400
South
&
400
East 












500,000
 100
Orem UT Streets/Roads New
Traffic
Signal
400
South
&
400
West 












500,000
 100
Orem UT Streets/Roads New
Traffic
Signal
800
North
&
200
East 












500,000
 100
Orem UT Streets/Roads New
Traffic
Signal
800
North
&
600
East 












500,000
 100
Orem UT Streets/Roads New
Traffic
Signal
800
North
&
600
West 












500,000
 100
Orem UT Streets/Roads New
Traffic
Signal
at
800
East
&
1200
North 












500,000
 100
Orem UT Streets/Roads New
Traffic
Signal
at
800
East
&
400
North 












500,000
 100
Orem UT Streets/Roads Roundabout
at
2000
South
&
Columbia
Lane 












500,000
 100
Orem UT Streets/Roads Widen
400
South
from
Orem
Boulevard
to
State
Street 












750,000
 100
Orem UT Streets/Roads Widen
800
South
from
Orem
Boulevard
to
State
Street 












950,000
 100
Orem UT Streets/Roads Carterville
Road/West
Union
Canal
Trail 










2,000,000
 150
Orem UT Streets/Roads ATMs
Improvements 










1,500,000
 200
Orem UT Streets/Roads Center
Street,
I‐15
to
Geneva
Road
Widening
Project 










3,000,000
 200
Orem UT Streets/Roads North
Union
Canal
Trail 










7,000,000
 250
Orem UT Streets/Roads Reconstruct
and
Improve
400
South,
1000
West
to
Geneva
Road 










4,500,000
 300
Orem UT Streets/Roads Sidewalk
Construc3on
Project 










2,800,000
 300
Orem UT Streets/Roads Street
Resurfacing
Project 










3,300,000
 300
Orem UT Streets/Roads Widen
1200
West,
900
North
to
1600
North 










4,000,000
 300
Orem UT Streets/Roads Widen
400
West
from
400
North
to
800
North 










4,500,000
 300
Orem UT Streets/Roads Widen
800
West,
400
North
to
Center
Street 










4,500,000
 300
Orem UT Streets/Roads Local
Street
Widening
Projects 










5,000,000
 500
Orem UT Streets/Roads Widen
400
South,
I‐15
to
Geneva
Road 








10,000,000
 500
Orem UT Water
Orem UT Water Sep3c
Elimina3on
Program 












500,000
 25
Orem UT Water Penstock
Secondary
Water
Line
Replacement 












250,000
 50
Orem UT Water Carterville
Pressure
Sewer 












500,000
 100
Orem UT Water Carterville
Road
Sewer
Project 












500,000
 100
Orem UT Water Cascade
Spring
Line
Replacement 












600,000
 100
Orem UT Water Main
Street,
1430
North
to
1600
North
Storm
Drain 












500,000
 100
Orem UT Water Water
Meter
Replacement
Program 










5,000,000
 100
Orem UT Water Water
Reclama3on
Facility
Expansion 








15,000,000
 150
Orem UT Water 2000
South/Geneva
Road
Water
Reuse
Project 










4,000,000
 200
Orem UT Water 400
North,
Main
Street
to
800
East
Storm
Drain 










1,500,000
 200
Orem UT Water SCERA
Park
Storm
Drain,
400
East
to
State
Street 










1,500,000
 200
Orem UT Water Waste
Water
Collec3on
Facility
Project 












700,000
 200
Orem UT Water 1200
North
Storm
Sewer,
400
East
to
1400
West 










4,500,000
 300
Orem UT Water 2000
South/Geneva
Road
Sewer
Project 










1,500,000
 300
Orem UT Water 2000
South/Geneva
Road
Water
Project 










1,500,000
 300
Orem UT Water 2000
South/Taylor
Storm
Drain
Area
Improvement 










3,500,000
 300
Orem UT Water 5
MG
Water
Tank 










5,000,000
 300
Orem UT Water Lindon
Hollow
Drainage
Ouzall 










3,500,000
 300
Orem UT Water Williams
Farm
Deten3on
Basin 










3,500,000
 300
Orem UT Water 4"
Waterline
Replacement
Project 










7,900,000
 500
Orem UT Water Alta
Spring
Line
Restora3on 










6,000,000
 500
Provo UT Airport Drainge
Improvements
at
Provo
Municipal 










1,000,000
 3
Provo UT Airport Ligh3ng
and
Fencing
Upgrades 










2,500,000
 15
Provo UT Airport New
airport
ramp 










4,000,000
 25
Provo UT CDBG 100
North
street‐sidewalk‐street
tree‐street
light
improvements
in
the
CBD 












250,000
 2
Provo UT CDBG Harmon
Park
Improvements 












150,000
 2
Provo UT CDBG Pioneer
Park
water
feature 












650,000
 2
Provo UT CDBG North
Park/Pioneer
Museum
Parking
Lot 












150,000
 4
Provo UT CDBG Center
Street
sprinkling
system
rehabilita3on 












300,000
 5
Provo UT CDBG Exchange
Park
Improvements 












200,000
 5
Provo UT CDBG Joaquin
Park
improvements 












800,000
 5
Provo UT CDBG New
community
center
for
the
Boulders/Franklin
South
neighborhood 












400,000
 5
Provo UT CDBG North
Park/Timp
Ball
Park
Reconstruc3on 












300,000
 5
Provo UT CDBG Paul
Reams
Wilderness
Park
Improvements 












350,000
 5
Provo UT CDBG Riverside
Park
Improvements 












200,000
 5
Provo UT CDBG Sidewalk
replacement
in
Pioneer
Neighborhoods 










2,000,000
 12
Provo UT CDBG Downtown
Parking
Infrastructure 










1,800,000
 25
Provo UT CDBG Addi3onal
Mountain
Vista
Business
Park
Infrastructure 










2,500,000
 30
Provo UT CDBG Reconstruct
broken‐down
concrete
planters
on
Center
Street
in
the
CBD 










2,500,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Provo UT CDBG New
community
recrea3on
center 








25,000,000
 40
Provo UT Energy Methane
Capture
at
SUVSWD
Landfil 










1,800,000
 12
Provo UT Housing Energy
Upgrades
for
Housing
Authority
Owned
Proper3es 










1,000,000
 80
Provo UT Public
Safety Police
department
indoor
gun
range
with
noise
afenua3on 












663,500
 11
Provo UT Streets/Roads Par3al
funding
for
200
West
railroad
underpass 








20,000,000
 120
Provo UT Transit Railroad
Quiet
Zone
Improvements 










1,250,000
 8
Provo UT Water Crea3on
of
Westside
Pressure
Zone
‐
Install
PRV
Sta3ons 












825,000
 2
Provo UT Water 8"
Force
Main
from
West
Center
St.
Lib
Sta3on
to
Gravity
Sewer 












275,600
 3
Provo UT Water 2550
West
Sewer
Interceptor 












480,444
 4
Provo UT Water Camelot
Sewer
Line 












216,000
 4
Provo UT Water Southeast
Reservoir
Drain
Line 












135,000
 4
Provo UT Water Automa3c
Meter
Reading
Infrastructure 










4,275,000
 5
Provo UT Water West
Center
Street
Sewer
Lib
Sta3on 












500,000
 5
Provo UT Water 10"
Gravity
Sewer
Lines
to
West
Center
Street
Lib
Sta3on 










1,010,800
 7
Provo UT Water Water
Maintenance
Facility
Repairs,
Efficiency
Upgrade
&
Solar
Roof 










1,250,000
 7
Provo UT Water Rock
Canyon
Well
and
Pump
House 












700,000
 8
Provo UT Water Solids
Handling
Facility
Upgrade
‐
Wastewater
Treatment
Plant 










2,000,000
 12
Provo UT Water New
5
MG
Water
Reservoir 










5,500,000
 17
Provo UT Water New
trunk
line
from
Wastewater
Treatment
Plant
across
I‐15 








10,000,000
 25
Provo UT Water 48"
Aqueduct
from
Mouth
of
Provo
Canyon
to
Main
Reservoirs 








10,381,000
 28
Salem UT CDBG Industrial
Park 










5,000,000
 50
Salem UT CDBG Recrea3on
Complex 








20,000,000
 200
Salem UT Streets/Roads Local
Road
Improvements 










5,000,000
 50
Salem UT Water Storm
Drain
System 








15,000,000
 150
Salem UT Water Regional
Wastewater
Transmission
Line 








50,000,000
 500
Salem UT Water Regional
Wastewater
Treatment
Plant 






250,000,000
 1250
Salt
Lake
City UT CDBG Facili3es
capital
project
design,
engineering,
feasibility
and
development 










1,000,000
 3
Salt
Lake
City UT CDBG Resurfacing
of
streets
and
installa3on
of
bicycle
lanes 












100,000
 5
Salt
Lake
City UT CDBG Construct
Jordan
River
Trail
crossing
of
Interstate‐80 












450,000
 10
Salt
Lake
City UT CDBG Jordan
Meadows
Park
Construc3on 












700,000
 10
Salt
Lake
City UT CDBG Replace
and
expand
downtown
wayfinding
signing
system 












400,000
 10
Salt
Lake
City UT CDBG New
Soccer
Field
1700
South
Jordan
River
Park 












300,000
 15
Salt
Lake
City UT CDBG ADA
sidewalk
ramp
construc3on 










1,500,000
 20
Salt
Lake
City UT CDBG Baseball
diamond
viewing
stands
and
concession
both
upgrades 












700,000
 20
Salt
Lake
City UT CDBG Construct
Jordan
River
Trail
between
Redwood
Road
and
north
city
limits 










1,300,000
 20
Salt
Lake
City UT CDBG Construct
Jordan
River
Trail
Crossing
of
Union
Pacific
Railroad
mainline 










1,500,000
 20
Salt
Lake
City UT CDBG Construct
Surplus
Canal
Bicycle
and
Pedestrian
Trail 












750,000
 20
Salt
Lake
City UT CDBG Park
baseball
diamonds,
stand
and
concession
improvements
2
parks 












700,000
 20
Salt
Lake
City UT CDBG Park
restroom
improvement
projects‐Redwood
and
1700
South
Street
parks;
Rosewood
Park
Restroom 










1,000,000
 20
Salt
Lake
City UT CDBG Park
stairways,
sidewalks
and
ADA
access
and
playgrounds
improvements
‐
4th
Avenue
stairs,
Rosewood
Park,

Reservoir
Park,
Shipp
Park
and
Jordan
Meadows
Community
Park 












900,000
 25
Salt
Lake
City UT CDBG Rotary
Glen
Park
Improvements
and
Restrooms 










1,300,000
 25
Salt
Lake
City UT CDBG 2007/2008
Residen3al
streets
reconstruc3on‐not
constructed‐
6
streets
(1.74
lane
miles) 










1,600,000
 30
Salt
Lake
City UT CDBG 2008/2009
Residen3al
street
reconstruc3on
Project‐
7
streets
(1.87
lane
miles) 










1,700,000
 30
Salt
Lake
City UT CDBG 2009/2010
Residen3al
street
reconstruc3on
Project–
7
streets
(1.87
lane
miles) 










1,700,000
 30
Salt
Lake
City UT CDBG Construct
North
Temple
Bicycle
and
Pedestrian
Trail 










2,000,000
 30
Salt
Lake
City UT CDBG Deteriorated
Sidewalk
Replacement 










2,000,000
 35
Salt
Lake
City UT CDBG Jordan
River
trail
ligh3ng
and
construc3on
‐
5
projects 










1,900,000
 40
Salt
Lake
City UT CDBG ADA
Playground
Upgrade
‐
3
parks 












600,000
 45
Salt
Lake
City UT CDBG Park
irriga3on
system
upgrades
‐
3
parks 










1,000,000
 45
Salt
Lake
City UT CDBG Construct
Folsom
Avenue
Bicycle
and
Pedestrian
Trail
&
linear
park 










6,000,000
 50
Salt
Lake
City UT CDBG Construct
900
South
Bicycle
and
Pedestrian
Trail
&
linear
park 










8,500,000
 60
Salt
Lake
City UT CDBG Capital
asset
renewal
on
City
facili3es 








75,000,000
 75
Salt
Lake
City UT CDBG Refugee
Welcome
Housing
‐
crea3on
of
175
housing
units
for
refugee
popula3on
in
Salt
Lake
City 








27,255,000
 145
Salt
Lake
City UT CDBG City
wide
asphalt
pavement
overlays

‐
18
streets 










3,000,000
 230
Salt
Lake
City UT CDBG Pavement
Overlays
&
Street
Preserva3on

‐
18
streets 










3,000,000
 230
Salt
Lake
City UT Energy Glass
recycling
capital
investment 










5,000,000
 5
Salt
Lake
City UT Energy Fuel
Cell
Co‐Genera3on
‐
Library/City
&
County
Boiler
Room 








10,000,000
 10
Salt
Lake
City UT Energy Grant
program
for
residen3al
energy
efficiency
projects 










1,000,000
 10
Salt
Lake
City UT Energy Solar
Hot
Water
and
2MW
Photovoltaic
Project
‐ 








10,000,000
 10
Salt
Lake
City UT Energy ESCO
Energy
Conserva3on
Projects
‐
All
City
&
County
Buildings 








30,000,000
 30
Salt
Lake
City UT Energy John
W.
Gallivan
Utah
Center
Renova3on
‐construc3on
of
a
LEED
cer3fied
building
for
restrooms
and
rental

facili3es,
replacing
expansion
joints,
repairing
surface
and
subsurface
drainage
system,
expansion
of
the

amphitheater
sea3ng
area,
and
an
enlarg 










5,200,000
 61
Salt
Lake
City UT Energy 20
MW
Geothermal
Power
Genera3on
Plant 








70,000,000
 70
Salt
Lake
City UT Housing Projects
UT004‐02
&
001
‐
City
Plaza,
Phillips
Plaza,
and
Romney
Plaza
(Public
Housing
Remodeling) 












374,000
 20
Salt
Lake
City UT Housing New
Construc3on
‐
Rendon
Terrace,
158
North
600
West
(Public
Housing) 










5,056,000
 22
Salt
Lake
City UT Public
Safety CBRN
suit
for
each
employee 










1,000,000
 0
Salt
Lake
City UT Public
Safety Constant
man
‐
minimum
staffing;
over3me
funding
to
call
individuals
to
work;
ongoing
budget
item 












130,000
 0
Salt
Lake
City UT Public
Safety In‐car
video
system
for
each
patrol
vehicle,
includes
installa3on 












750,000
 0
Salt
Lake
City UT Public
Safety Man
portable
and
EOD
response
robot. 












115,000
 0
City State Program Project
Descrip3on Funding
Required Jobs
Salt
Lake
City UT Public
Safety Night
vision
and
thermal
imaging
units 












120,000
 0
Salt
Lake
City UT Public
Safety Prisoner
transport
seats
to
be
placed
in
patrol
vehicle 












100,000
 0
Salt
Lake
City UT Public
Safety Aerial
surveillance
drone
to
monitor
crowd
and
event
situa3ons;
1
officer
and
equipment 












200,000
 1
Salt
Lake
City UT Public
Safety Facial
recogni3on
on
UTA
buses,
TRAX
sta3ons
and
terminals.

100
cameras,
including
installa3on,

maintenance
and
monitoring. 












150,000
 1
Salt
Lake
City UT Public
Safety Purchase
of
air
card
for
all
officers,
include
setup
and
maintenance
to
access
cri3cal
infrastructure
informa3on,

receive
immediate
updates,
and
ease
communica3on
during
emergency
situa3ons. 














80,000
 1
Salt
Lake
City UT Public
Safety Salt
Lake
Informa3on
Center
(SLIC)
response
vehicle
equipped
with
vehicle‐based
PC,
monitors
and
other

equipment 












173,000
 1
Salt
Lake
City UT Public
Safety Automa3c
Vehicle
Locator
System
for
Fire
Sta3on
14 














90,689
 2
Salt
Lake
City UT Public
Safety Crime
Preven3on
Through
Environmental
Design
(CPTED);
2
officers
with
vehicles 












286,000
 2
Salt
Lake
City UT Public
Safety DNA
tes3ng.
$4,000
per
test
and
2
civilian
employees
to
manage. 












200,000
 2
Salt
Lake
City UT Public
Safety License
plate
reader
cars
to
look
for
stolen
cars;
2
vehicles
@
$45,000
each
and
2
officers. 












256,000
 2
Salt
Lake
City UT Public
Safety Sobware
program
to
search,
manage
and
analyze
vast
amounts
of
criminal
inves3ga3on
informa3on
from
wide

ranging
data
sources.

Include
sobware
program,
server,
IT
support
and
2
officers. 












836,000
 2
Salt
Lake
City UT Public
Safety Mo3on
tracking
sobware;

camera
sensors
to
no3fy
monitoring
employees
of
suspicious
ac3vi3es.

Include
3

officers. 












214,000
 3
Salt
Lake
City UT Public
Safety SPIDR.

Use
of
spherical
camera
to
record
cri3cal
infrastructure.

Informa3on
to
be
available
to
all
officers
in

3mes
of
hostage
crisis,
barricade,
etc.

Available
via
VPN,
air
card.

2
officers
and
1
sergeant
to
implement,

record
and
manage. 












279,000
 3
Salt
Lake
City UT Public
Safety Prisoner
transport
van;
vehicle
and
4
officers 












452,000
 4
Salt
Lake
City UT Public
Safety Traffic
Control
Systems
for
Emergency
Response 












400,000
 4
Salt
Lake
City UT Public
Safety Dedicated
DUI
squad;
1
sergeant
and
6
officers 












950,000
 7
Salt
Lake
City UT Public
Safety Fire
Sta3on
15
‐
new
fire
sta3on
for
Southwest
Quadrant
of
SLC 










2,600,000
 20
Salt
Lake
City UT Public
Safety Increase
bike
patrol
in
area.

Add
4
squads,
6
officers
and
1
sergeant
per
squad. 










1,964,000
 28
Salt
Lake
City UT Public
Safety Increase
foot
patrol
in
area.

Add
4
squads,
6
officers
and
1
sergeant
per
squad. 










1,964,000
 28
Salt
Lake
City UT Public
Safety Fire
Training
Center
and
rebuild
Fire
Sta3on
14 










9,961,000
 30
Salt
Lake
City UT Streets/Roads 600
East
600
South
‐
new
traffic
signal 












160,000
 3
Salt
Lake
City UT Streets/Roads 3400
West
California
Ave
and
3800
West
California
Ave
‐
new
traffic
signals 












320,000
 6
Salt
Lake
City UT Streets/Roads 700
East
‐
S.
Temple
to
700
South
‐
replace
street
ligh3ng 












600,000
 8
Salt
Lake
City UT Streets/Roads Concrete
Pavement
Rehabilita3on
2008/2009
Project
‐
candidates
not
iden3fied 












500,000
 10
Salt
Lake
City UT Streets/Roads Concrete
Pavement
Rehabilita3on
2009/2010
Project
‐
candidates
not
iden3fied 












500,000
 10
Salt
Lake
City UT Streets/Roads Concrete
Pavement
Rehabilita3on
Project
‐
Previous
not
constructed
9
streets
(3.8
LM) 












500,000
 10
Salt
Lake
City UT Streets/Roads Install
remote
control
system
for
Sugar
House
street
ligh3ng
system 












350,000
 10
Salt
Lake
City UT Streets/Roads 2009/2010
Pavement
Overlay
and
Preserva3on
–
9
streets
(7.06
L.M.) 










1,500,000
 15
Salt
Lake
City UT Streets/Roads Replace
North
Temple
Street
Ligh3ng
system 










2,000,000
 15
Salt
Lake
City UT Streets/Roads Street
Pavement
Overlay
Project
‐
Previous
streets
not
overlayed
‐
11
streets
(7.27
lane
miles) 










1,500,000
 15
Salt
Lake
City UT Streets/Roads Install
new
HAWK
Pedestrian
crossing
signals 












800,000
 20
Salt
Lake
City UT Streets/Roads Install/Replace
Traffic
Signal
Detec3on
at
200
intersec3ons 












800,000
 20
Salt
Lake
City UT Streets/Roads Replace
40+
year
street
lights
citywide
using
more
efficient
lights 












800,000
 20
Salt
Lake
City UT Streets/Roads Replace
the
City's
Traffic
Control
Center
Computer
Map 












500,000
 20
Salt
Lake
City UT Streets/Roads 2008/2009
Local
Streets
Reconstruc3on
Project
‐
7
streets
(1.87
lane
miles) 










1,700,000
 30
Salt
Lake
City UT Streets/Roads 2009/2010
Local
Streets
Reconstruc3on
Project
‐
7
streets
(1.87
lane
miles) 










1,700,000
 30
Salt
Lake
City UT Streets/Roads Intersec3on
traffic
signal
upgrades
‐
14
intersec3ons 










2,240,000
 30
Salt
Lake
City UT Streets/Roads Previous
Local
Streets
Reconstruc3on
not
constructed
‐
6
streets
(1.74
L.M.) 










1,600,000
 30
Salt
Lake
City UT Streets/Roads 500
East
Reconstruc3on
from
1300
South
to
2100
South 










2,800,000
 45
Salt
Lake
City UT Transit Construct
paved
track‐way
on
Airport
Light
Rail
project 










8,000,000
 15
Salt
Lake
City UT Transit Construct
the
Sugar
House
Streetcar
line
connec3ng
downtown
Sugar
House
to
the
regional
light
rail
system 








55,000,000
 100
Salt
Lake
City UT Transit Construc3on
of
a
new
streetcar
line
in
southwest
downtown
connec3ng
the
intermodal
transporta3on
center

with
major
des3na3ons
including
a
regional
park,
providing
an
underpass
for
the
streetcar
and
major
trail

under
the
Union
Pacific
Railroad
mainlin 






100,000,000
 100
Salt
Lake
City UT Transit Construct

two
light
rail
extensions
downtown
(400
South
extension
to
Hub
and
700
South/400
West

extension)
to
complete
the
adopted
Downtown
Transporta3on
Master
Plan
light
rail
system 






175,000,000
 150
Salt
Lake
City UT Transit Construc3on
of
a
new
light
rail
North
Temple
viaduct
over
Union
Pacific
and
UTA
Commuter
rail
tracks

including
new
roadway
improvements,
pedestrian
walks
with
security
ligh3ng
and
a
passenger
transfer
sta3on

between
the
presently
being
constructed
Airp 








65,000,000
 180
Salt
Lake
City UT Water Big
Cofonwood
Water
Treatment
Plant
‐
Filter
Valve
Rehab 












250,000
 1
Salt
Lake
City UT Water Parleys
Water
Treatment
Plant
‐
Intake
Structure
Rehab 












250,000
 1
Salt
Lake
City UT Water Water
Reclama3on
Plant
‐
Iron
Sponge 












350,000
 2
Salt
Lake
City UT Water Water
Reclama3on
Plant
‐
Lab
Roof
and
HVAC
Replacement 












350,000
 2
Salt
Lake
City UT Water Water
Administra3on
Facility
&
Energy
Efficiently
Upgrade 












750,000
 4
Salt
Lake
City UT Water Water
Reclama3on
Plant
‐
Clarifier
Weir
and
Baffle
Reconstruc3on 












750,000
 4
Salt
Lake
City UT Water Big
Cofonwood
Water
Treatment
Plant
‐
Computer
Control
Upgrade
&
Maintenance
Program
Upgrade 












350,000
 6
Salt
Lake
City UT Water Water
Reclama3on
Plant
‐
Secondary
Clarifier
Weir
and
Baffle
Rehab 










1,250,000
 7
Salt
Lake
City UT Water North
Bench
Booster
Pump
Sta3on
Rehabilita3on 










1,500,000
 8
Salt
Lake
City UT Water Water
Reclama3on
Plant
‐
Odor
Control
Facility
Rehabilita3on 










1,500,000
 8
Salt
Lake
City UT Water Creek
Road
Water
Main
Upgrade 










1,700,000
 9
Salt
Lake
City UT Water 48"
Sewer
Main
Corrosion
Rehabilita3on 










2,000,000
 11
Salt
Lake
City UT Water Water
Distribu3on
System
Replacements 










3,500,000
 19
Salt
Lake
City UT Water Cofonwood
Park
irriga3on
system
upgrade 












500,000
 20
Salt
Lake
City UT Water City
Creek
Water
Treatment
Plant
‐
Phase
2
Seismic
Upgrade 










6,000,000
 33
Salt
Lake
City UT Water Water
Reclama3on
Plant
‐
Digester
Cover
Rehab 










6,000,000
 33
City State Program Project
Descrip3on Funding
Required Jobs
Salt
Lake
City UT Water Water
Maintenance
Facility
Repairs,
Efficiency
Upgrade
&
Solar
Roof 










3,500,000
 35
Salt
Lake
City UT Water Big
Cofonwood
Water
Treatment
Plant
‐
Floccula3on
System
rehab
and
structural/seismic
rehabilita3on 










8,000,000
 40
Salt
Lake
City UT Water Water
Reclama3on
Plant
‐
Phase
1
Plant
SCADA
Control
and
Electrical
Update 










1,500,000
 60
Salt
Lake
City UT Water Water
Reclama3on
Plant
‐
Construc3on
Alterna3ve
Disinfec3on
system
to
replace
chlorine
gas
system
for

public
and
operator
safety 








13,000,000
 66
Sandy
City UT Streets/Roads
Sandy
City UT Streets/Roads Reconstruc3on
of
1300
East
which
is
a
major
commuter
corridor
to
communi3es
from
Draper
City
to
the
south

to
Salt
Lake
City
to
the
north.

Daily
traffic
es3mates
are
45,000
vehicles
per
day.

The
project
is
funded
from

7800
South
to
10200
South
and
bid 








17,000,000
 150
Taylorsville UT Public
Safety New
6200
South
2700
West
Fire
Sta3on 










4,500,000
 40
Taylorsville UT Public
Safety New
Police
Evidence
Warehouse 










1,000,000
 75
Taylorsville UT Public
Safety Arts
/
Jus3ce
Center 








10,000,000
 100
Taylorsville UT Streets/Roads Bonnie
Brook
Roadway
Reconstruc3on
–
0.50
miles
of
roadway
reconstruc3on
of
failed
roadway,
deteriorated

curb,
gufer
and
sidewalk. 










1,250,000
 17
Taylorsville UT Streets/Roads 1175
West
Roadway
Reconstruc3on
–
0.5
miles
of
roadway
reconstruc3on
to
include
widening,
traffic
calming

features,
new
curb
&
gufer,
irriga3on
line
reloca3on. 










1,500,000
 20
Taylorsville UT Streets/Roads 1300
West
Trail
–
2.2
miles
of
roadway
widening
to
include
bicycle
paths,
new
curb,
gufer
and
sidewalk,
and

storm
water
control 










1,500,000
 20
Taylorsville UT Streets/Roads Redwood
Road
Business
District
Enhancement
‐
3.5
miles
of
roadway
reconstruc3on
to
help
alleviate
traffic

conges3on,
improve
traffic
and
pedestrian
safety,
increase
business
access
to
aid
economic
development,

reduce
blight
and
enhance
beau3fica3on. 








18,000,000
 100
Taylorsville UT Water 2600
West
4220
South
Storm
Drain
–
Installa3on
of
new
storm
drain
infrastructure
to
bypass
exis3ng
irriga3on

facili3es 












110,000
 4
Taylorsville UT Water 3200
West
5650
South
Storm
Drain
–
Replacement
of
exis3ng
18”
storm
pipe
with
a
27”
pipe 












130,000
 4
Taylorsville UT Water 4375
South
1350
West
Storm
Drain
–
Replacement
of
a
failing
36”
storm
drain
pipe 












120,000
 4
Taylorsville UT Water Con3nental
drive
Storm
Drain
–
Replacement
of
failing
15”
storm
drain
pipe 












190,000
 4
Taylorsville UT Water 3600
West
4850
South
Storm
Drain
–
Installa3on
of
new
storm
drain
infrastructure
to
bypass
exis3ng
irriga3on

facili3es 












320,000
 6
Taylorsville UT Water 6200
South
3650
West
Storm
Drain
–
36”
storm
drain
pipe
replacement 












300,000
 6
Taylorsville UT Water Bennion
Road
Storm
Drain
–
Installa3on
of
27”
storm
drain
pipe 












360,000
 6
Taylorsville UT Water Inlet
Box
Replacement
–
Replacement
of
30
deteriorated
inlet
boxes 












250,000
 6
Taylorsville UT Water 1300
West
4505
South
Storm
Drain
–
Replacement
of
deteriorated
36”
storm
drain
pipe 












440,000
 10
Taylorsville UT Water 1950
West
Storm
Drain
–
Installa3on
of
new
24”
storm
drain
pipe 












470,000
 10
Taylorsville UT Water 1300
west
Winchester
Storm
Drain
–
1
mile
of
27”
storm
drain
pipe,
including
curb
and
gufer 












610,000
 12
Taylorsville UT Water 1300
West
4375
South
Storm
Drain
–
Replacement
of
an
exis3ng
36”
storm
drain
pipe
with
a
48”
pipe 












650,000
 13
Taylorsville UT Water 1250
West
Storm
Drain
–
1
mile
of
24”
storm
drain
pipe
including
new
curb
and
gufer 












680,000
 14
Taylorsville UT Water 3200
West
5000
South
Storm
Drain
–
1500’
of
new
24”
storm
drain
pipe 












930,000
 18
Taylorsville UT Water 2200
West
4200
South
Storm
Drain
–
1
mile
of
48”
storm
drain
pipe
to
alleviate
flooding 










1,250,000
 20
West
Jordan UT CDBG Ron
Woods
Baseball
Complex
Phase
II
will
complete
the
baseball
complex
in
the
Western
sec3on
of
the
City. 










3,000,000
 85
West
Jordan UT Energy Comple3on
of
the
Supervisory
Control
&
Data
Acquisi3on
System
for
the
West
Jordan
water
system. 












550,000
 30
West
Jordan UT Energy Solar
ligh3ng
system
for
the
West
Jordan
Public
works
complex.

This
project
will
provide
a
25
KW
solar
ligh3ng

system. 












250,000
 30
West
Jordan UT Public
Safety 39
In‐Car
Digital
Camera
Systems

70
Spillman
Mobile
Communica3on
Systems
 












350,000
 15
West
Jordan UT Public
Safety Construc3on
of
a
Police
Substa3on/Fire
Sta3on
to
serve
the
Western
por3on
of
West
Jordan.

This
area
has

experienced
the
highest
rate
of
development
in
the
last
10
years. 










3,500,000
 250
West
Jordan UT Streets/Roads 5600
West
Road
Project
will
add
two
traffic
lanes
and
a
turn
lane
in
the
construc3on
of
a
5
lane
road.

The

project
will
allow
for
the
loca3on
of
a
new
Home
Depot
and
Albertson
Grocery
Store
crea3ng
permanent
jobs. 








19,000,000
 230
West
Jordan UT Streets/Roads 7800
South
Road
project
will
add
two
traffic
lanes
and
a
turn
lane
for
a
new
5‐lane
road.

The
project
will

connect
with
the
5600
West
Road
project
to
allow
for
the
loca3on
of
a
new
Home
Depot
and
Albertson

Grocery
Store. 










5,000,000
 230
West
Jordan UT Water Wildflower
Deten3on
Pond
will
provide
for
adequate
reten3on
of
storm
water
runoff
to
prevent
future
flash

flooding
of
areas
in
the
City
of
West
Jordan. 










1,000,000
 85
West
Jordan UT Water Copperton
Reservoir
Project
will
provide
for
storage
of
potable
water
for
the
City
of
West
Jordan
water
system.












2,000,000
 95
Alexandria VA CDBG Construct
the
Eisenhower
Avenue
Shared
Use
Path
Underpass
(Phase
1A).













750,000
 10
Alexandria VA CDBG Rehabilitate
or
replace
sec3ons
of
the
Mount
Vernon
Trail
in
Old
Town
Alexandria
to
provide
connec3ons
to

Washington,
DC
and
George
Washington's
Mount
Vernon
estate. 










1,000,000
 13
Alexandria VA CDBG Rehabilitate
or
replace
sidewalks
for
seven
blocks
on
King
Street
(from
the
Waterfront
Unit
block
to

Washington
Street)
in
historic
Old
Town
Alexandria. 










3,450,000
 46
Alexandria VA CDBG Construct
a
two‐mile,
linear,
non‐motorized
transporta3on
corridor
in
Potomac
Yard,
to
connect
Braddock

Road
Metro
with
Four
Mile
Run
Park. 










4,000,000
 53
Alexandria VA Energy Convert
all
of
the
City’s
exis3ng
incandescent
traffic
signal
displays
to
LED
lamps.

Conver3ng
to
more
efficient

LED
lamps
will
reduce
energy
consump3on
by
an
es3mated
90%.
Conver3ng
to
LED
displays
should
save
an

es3mated
11,826
KWH
annually.

Thi 












800,000
 11
Alexandria VA Energy Addi3on
of
microturbine
co‐generators
at
5
City
Recrea3on
Centers
and
at
City
Hall
to
mi3gate
power

conges3on
and
facilitate
clean
energy
genera3on
in
each
area. 










2,000,000
 27
Alexandria VA Energy Green
roof
‐‐
Wastewater
Treatment
Facility 










2,000,000
 27
Alexandria VA Energy Energy
Retrofit
‐‐
Wastewater
Treatment
Facility 










6,000,000
 80
Alexandria VA Housing Scafered
Sites
II
‐
Saxony
Place
Substan3al
rehabilita3on
of
five
(5)
affordable
hoiusing
units
due
to
age,
wear
 












162,500
 2
Alexandria VA Housing Substan3al
Rehabilita3on
of
15
Affordable
housing
units,
building
&
site
due
to
old
age
and
substandard

condi3ons. 












234,089
 3
Alexandria VA Housing Substan3al
Rehabilita3on
of
38
Affordable
housing
units
for
seniors
and
disable
persons
at
Park
Place
.


 












323,000
 4
City State Program Project
Descrip3on Funding
Required Jobs
Alexandria VA Housing Building
Envelope
and
Infrastructure
Replacement
and
Repairs
to
nine
(9)
Scafered
Sites
Public
Housing

affordable
housing
due
age,
wear
and
deteriora3on. 












390,000
 5
Alexandria VA Housing Cameron
Valle
Scatered
Sites
II:
Substan3al
structural
repairs
to
building
founda3ons,
structure,
and
building
envelope
due
to
age
and
effects

of
erosion.
Total
of
fibeen
(15)
public
housing
homes. 












375,550
 5
Alexandria VA Housing Scafered
Sites
II,
W.
Braddock
Rd.:

Substan3al
rehabilita3on
of
site,
including
erosion
control
and
building

structures
(affordable
housing
units). 












515,917
 7
Alexandria VA Housing Ladrey
Senior
High‐Rise
Building
(170
units
for
seniors
and
dicable):
Substan3al
replacement
and
repair
of
building
envelope,
structure
and
systems
due
to
age,
wear
and
tear
 












875,000
 12
Alexandria VA Housing Substan3al
Rehabilita3on
of
80
substandard
public
housing
units
including
building,
site
and
interior
due
to

building
age
and
deteriora3on. 










1,762,574
 23
Alexandria VA Public
Safety Computer
Crimes
Equipment
and
Technology
to
conduct
forensic
analysis
on
electronic
devices. 














90,000
 1
Alexandria VA Public
Safety Firearms
Diagnos3c
Unit 














26,000
 1
Alexandria VA Public
Safety Moving
radar
for
motorcycles
(10
units) 














32,000
 1
Alexandria VA Public
Safety T3
Mo3on
electric
Vehicles 














33,000
 1
Alexandria VA Public
Safety Wireless
Network
Encryp3on
for
Mobile
Computer
transmissions 












118,000
 2
Alexandria VA Public
Safety NBPD
SRO
Program 












210,000
 3
Alexandria VA Schools School
Bus
Two
Way
Communica3on
System

Virginia
State
law
was
changed
as
of
July
1,
2008,
and
school
bus
drivers
are
not
allowed
to
operate
cell

phones
while
driving
their
vehicles.
This
project
would
provide
a
two
way
radio
system.

School
bus
drive 












400,000
 5
Alexandria VA Schools Elementary
Classroom
Mobile
Laptop
Carts
:
This
project
is
for
the
implementa3on
of
mobile
laptop
carts
at
13
elementary
schools.
Currently,
classrooms

compete
for
25
stand
alone
worksta3ons
in
the
schools’
computer
labs.
This
transi3on
would
place
2
 










1,104,000
 15
Alexandria VA Schools Emergency
Generators:
Installa3on
of
emergency

generators
and
automa3c
changeover
switches
to
allow
the
opera3on
of
school
facili3es
as
shelters
in
the

event
of
power
outages.
Cri3cal
building
systems
to
be
powered
by
the
emergency
generator
wou 










1,700,000
 23
Alexandria VA Schools James
Polk
Elementary
School‐‐
Replacement
of
the
HVAC
systems
throughout
the
facility,
including
the
hot

water
boilers,
central
system
pumps,
hot
and
chilled
water
piping,
fan
coil
units
in
every
classroom,
air

handling
units
for
mul3purpose
room,
cafet 










6,234,000
 83
Alexandria VA Schools John
Adams
Elementary
School‐‐

Replacement
of
the
HVAC
systems
throughout
the
facility,
including
the
central
pumps,
hot
and
chilled
water

piping,
fan
coil
units
in
every
classroom,
air
handling
units
for
gymnasium,
auxiliary
gym,
cafeteria,
library,
 








11,059,000
 147
Alexandria VA Schools Minnie
Howard
School‐‐
Replacement
of
the
HVAC
systems
throughout
the
two
story
classroom
wing,
the

gymnasium
wing,
and
the
admin
wing
of
the
facility,
including
the
hot
water
boilers,
the
air
cooled
chiller,

central
system
pumps,
hot
and
chilled
water
pi 








11,022,000
 147
Alexandria VA Streets/Roads Replace
all
guard
rail
ends
to
meet
the
current
safety
standards
of
State
and
Federal
requirements. 












900,000
 12
Alexandria VA Streets/Roads Pave
King
Street
from
the
Waterfront
to
King
Steet
Metro
Sta3on
in
Historic
Old
Town,
Alexandria. 










1,200,000
 16
Alexandria VA Streets/Roads Pave
‐‐
overlay
the
concrete
streets
at
the
I‐395
overpasses
on
Duke
Street
and
King
Street
and
Eisenhower

Avenue
from
Bluestone
Road
to
Holmes
Run
Bridge. 










1,500,000
 20
Alexandria VA Streets/Roads Pave
all
streets
in
historic
Old
Town,
Alexandria
within
the
following
grid:
Waterfront
to
Franklin
Street,
to
St.

Asaph
Street
to
Pendleton
Street
to
the
waterfront. 










2,100,000
 28
Alexandria VA Streets/Roads Reconstruc3on
of
Madison
&
Montgomery
Streets
between
Fairfax
and
St
Asaph
Streets.

Theses
streets

par3ally
lie
over
an
abandoned
landfilled
canal.

Subbase
will
need
to
be
stabilized,
in
addi3on
to
some
full
and

par3al
depth
roadway
reconstruc3on.
 










7,500,000
 102
Alexandria VA Transit Purchase
and
install
foldable
bicycle
racks
for
all
DASH
buses
to
improve
mul3‐modal
transporta3on
op3ons. 












400,000
 5
Alexandria VA Transit Purchase
four
hybrid‐vehicle
converted
trolleys
and
ini3ate
City‐run
trolley
service
to
replace
exis3ng

contractor
service.
Trolley
available
as
a
free
service
10
a.m.
to
10
p.m.
daily
in
Alexandria
historic
Old
Town

district.
Bus
build
and
hybrid
retro 










2,400,000
 32
Alexandria VA Transit Purchase
addi3onal
buses
for
Alexandria
Transit
Company
(DASH)
to
defray
replacement
costs
of
new
buses,

and
forestall
fare
increases
that
would
otherwise
be
imposed
on
residents. 










5,500,000
 73
Alexandria VA Water Construc3on
of
stormwater
bypass
to
alleviate
localized
flooding
at
the
intersec3on
of
Key
Drive
and
Francis

Hammond
Parkway. 










1,500,000
 20
Alexandria VA Water Reline
three
miles
of
storm
sewer
pipe
on
the
West
End
of
Alexandria. 










1,800,000
 24
Alexandria VA Water Chemical
system
upgrade
at
Wastewater
Treatment
Facility 










2,000,000
 27
Alexandria VA Water Commonwealth
Sewer
Rehabilita3on
and
Repair 










2,500,000
 33
Alexandria VA Water Transformer
and
switch
gear
replacement
at
Wastewater
Treatment
Facility 










3,000,000
 40
Alexandria VA Water Perform
channel
maintenance
in
Backlick
Run
and
Holmes
Run
from
the
R/R
bridge
to
Park
Drive. 










3,500,000
 46
Alexandria VA Water Replacement
of
aging
bulkhead
at
Windmill
Park
along
Potomac
River.

 










5,500,000
 73
Alexandria VA Water Remedia3on
of
infiltra3on/inflow
condi3ons
for
por3ons
of
the
sanitary
sewer
system
in
the
Holmes
Run

Sewershed.

 










7,500,000
 100
Alexandria VA Water Security
and
energy
upgrades
at
Wastewater
Treatment
Facility 










9,000,000
 120
Alexandria VA Water Storm
Sewer
improvement
project
to
alleviate
localized
flooding
at
the
intersec3on
of
Braddock
Road
and

West
Street.
This
project
would
also
remove
storm
water
from
City
combined
sewer.

 








24,000,000
 320
Colonial
Beach VA Public
Safety New
Police
Facility.
This
5400
square
b.
facility
will
replace
the
current
facility
which
was
built
in
1940.

The

exis3ng
facility
floods
during
heavy
rains
and
ADA
accessibility
is
inadequate,
at
best.
The
Town
is
strategically
located
on
the
banks
of 












500,000
 20
Colonial
Beach VA Water ‐WATER
Install
approximately
6000
linear
b
of
8"
water
line
on
Livingstone
Street
and
Colonial
Avenue
between

Washington
Avenue
and
Billingsley
and
Taggert
connec3ng
to
exis3ng
8"
looped
mains
at
ends
‐6800
linear
feet
of
replacement
water
main
on
Ban 










3,480,000
 30
Fredericskburg VA CDBG Riverfront
Park 










4,000,000
 16
Fredericskburg VA Energy New
Court
Building
‐
Replacement
of
Three
Exis3ng
Courts
in
downtown
‐
LEED
Cer3fied 








60,000,000
 300
Fredericskburg VA Streets/Roads Pathways
‐
Cowan
Boulevard
Connector 












175,000
 1
Fredericskburg VA Streets/Roads Pathways
‐
Embrey
Dam
/
Rappahannock
Canal 












520,000
 2
Fredericskburg VA Streets/Roads Pedestrian
Safety
and
Traffic
Signal
Improvements
‐
City‐wide 












500,000
 2
Fredericskburg VA Streets/Roads Princess
Anne
Street
Intersec3on
Improvements
‐
Traffic
and
Pedestrian
Safety 












500,000
 2
Fredericskburg VA Streets/Roads Pathways
‐
Rappahannock
River
Heritage
Trail 












700,000
 3
City State Program Project
Descrip3on Funding
Required Jobs
Fredericskburg VA Streets/Roads Rehabilita3on
of
U.S.
1
Bridge
over
the
Rappahannock
Canal 












750,000
 3
Fredericskburg VA Streets/Roads Rehabilia3on
of
the
U.S.
1
Bridge
Over
State
Route
3 












950,000
 4
Fredericskburg VA Streets/Roads Rehabilita3on
of
U.S.
1
Bridge
over
Hazel
Run 












970,000
 4
Fredericskburg VA Streets/Roads Replacement
of
the
Fall
Hill
Avenue
Bridge
over
the
Rappahannock
Canal 












941,600
 4
Fredericskburg VA Streets/Roads Pathways
‐
Virginia
Central
Railway 










1,880,000
 8
Fredericskburg VA Streets/Roads Street
Reconstruc3on
or
Rehabilita3on
‐
City
Wide 










2,000,000
 8
Fredericskburg VA Streets/Roads Replace
Fall
Hill
Avenue
Bridge
over
I‐95
and
lane
widening
of
Fall
Hill
Avenue
between
I‐95
and
Carl
D.
Silver

Parkway 








11,500,000
 46
Fredericskburg VA Water Wastewater
Treatment
Plant
Upgrades 










4,000,000
 16
Hampton VA CDBG Queen
Street/Lincoln
Street
Connector
Road 












200,000
 4
Hampton VA CDBG Kecoughtan
Corridor
Streetscape
at
the
City
Line 












400,000
 8
Hampton VA CDBG Buckroe
Soccer
Fields,
Phase
2 












500,000
 10
Hampton VA CDBG Mercury
Boulevard/Mallory
Street
Streetscape 












500,000
 10
Hampton VA CDBG Newmarket
Creek
Trail,
Phase
1 












800,000
 16
Hampton VA CDBG Newtown
Learning
Center 










1,000,000
 20
Hampton VA CDBG Crossroads
Parking
Lots 










1,375,000
 28
Hampton VA CDBG Phoebus
Waterfront
Improvements 










1,450,000
 29
Hampton VA CDBG Pembroke
Avenue
Streetscape
in
Buckroe 










1,650,000
 33
Hampton VA CDBG Old
Hampton
Community
Center 










9,000,000
 180
Hampton VA Energy Upgrade
Traffic
Signals
to
All
LED
Throughout
the
City 












325,000
 7
Hampton VA Energy Big
Bethel
Road
Fire
Sta3on 










3,000,000
 60
Hampton VA Housing Clean
HVAC
Duct
Work
at
North
Phoebus
Townhouses 














25,000
 2
Hampton VA Housing Electrical
Panel
Replacement
at
North
Phoebus
Townhouses 












150,000
 2
Hampton VA Housing Hot
Water
Heater
Replacement
at
North
Phoebus
Townhouses 














54,200
 2
Hampton VA Housing Carpet
Replacement
for
Lincoln
Park
High‐Rise 












153,400
 6
Hampton VA Housing Roof
Replacement
for
Lincoln
Park
High‐Rise 












109,100
 6
Hampton VA Housing Roof
Replacement
for
Lincoln
Park
Low‐Rise 










1,031,000
 6
Hampton VA Housing Roof
Replacement
for
Lincoln
Park
Management
Office 














18,000
 6
Hampton VA Housing Roof
Replacement
for
Suzanne
Jones
Day
Care
Facility 














96,200
 6
Hampton VA Housing Vinyl
Flooring
Replacement
for
Lincoln
Park
High‐Rise 














39,300
 6
Hampton VA Housing Asphalt
Repair
and
Overlay
at
Langley
Village
Apartment
Complex 














89,110
 8
Hampton VA Public
Safety Surveillance
Equipment
for
the
Intelligence
Unit
and
Gang
Unit,
Undercover
Intel
Vehicle,
and
Intel
Analyst

Posi3on 












164,000
 1
Hampton VA Public
Safety Expansion
of
Crime
Scene
Unit
to
Include
Addi3onal
Forensic
Technicians
and
Forensic
Worksta3ons 












303,000
 2
Hampton VA Public
Safety Update
to
Marine
Patrol
Ac3vi3es
to
Include
Addi3onal
Officers
and
Support
Equipment 












583,000
 2
Hampton VA Public
Safety Update
to
SWAT
and
Homeland
Security
Units
to
Include
Addi3onal
Officers,
Ballis3c
Equipment,
and
Logis3c

Support
Equipment 










1,100,000
 2
Hampton VA Public
Safety Addi3onal
School
Resource
Officers 












500,500
 4
Hampton VA Public
Safety Air
Tac3cal
Unit
Support
and
Equipment 










3,500,000
 6
Hampton VA Public
Safety Emergency
Communica3on
System
Upgrade
to
Replace
the
Current
and
Outdated
Analog
System 








15,500,000
 8
Hampton VA Public
Safety Enhancements
to
the
High
Impact
Unit
to
Include
Addi3onal
Officers,
Vehicles,
and
Equipment
Necessary
for

this
Unit
to
Respond
to
Specialized
Patrol
Challenges 










1,240,100
 12
Hampton VA Schools 6
Middle
School
Locker
Room
Upgrades 












500,000
 10
Hampton VA Schools Cary
Elementary
School
Improvements 














40,000
 10
Hampton VA Schools Forrest
Elementary
School
Parking
Lot
Expansion 












350,000
 15
Hampton VA Schools Krab
Elementary
School
Parking
Lot
Upgrades 












350,000
 15
Hampton VA Schools Machen
Elementary
School
Parking
Lot
Expansion 












225,000
 15
Hampton VA Schools Merrimack
Elementary
School
Parking
Lot
Expansion 












225,000
 15
Hampton VA Schools Tyler
Elementary
School
Replacement
of
Deteriora3ng
Steel
Front
Canopy 












200,000
 15
Hampton VA Schools Darling
Stadium
Improvements
(Serves
4
High
Schools) 










1,000,000
 20
Hampton VA Schools Phillip
Elementary
School
Improvements
to
Include
Parking
Lot
Expansion
adn
Hallway
Asbestos
Abatement 












290,000
 20
Hampton VA Schools Bryan
Elementary
School
Improvements 












900,000
 25
Hampton VA Schools Booker
Elementary
School
Renova3on 










1,000,000
 30
Hampton VA Schools Eaton
Middle
School
Auditorium
Upgrades 












500,000
 30
Hampton VA Schools Kecoughtan
High
School
Auditorium
Upgrades 












500,000
 30
Hampton VA Schools Mallory
Elementary
School
HVAC
and
Window
Replacement
 












600,000
 30
Hampton VA Schools Spratley
Middle
School
Auditorium
Upgrades 












500,000
 30
Hampton VA Schools Tucker
Capps
Elementary
School
Improvements 












290,000
 35
Hampton VA Schools All
Schools'
Kitchens
(34)
HVAC
Upgrade
 












850,000
 40
Hampton VA Schools Burbank
Elementary
School
Improvements 












650,000
 45
Hampton VA Schools 24
Elementary
School
Gymnasium
Addi3ons 








16,800,000
 50
Hampton VA Schools New
Transporta3on
Opera3ons
and
Maintenance
Facility 










6,000,000
 50
Hampton VA Schools Various
Schools
Ligh3ng
Upgrades
and
HVAC
Controls 










2,500,000
 50
Hampton VA Schools Bethel
High
School
Renova3on 










5,000,000
 60
Hampton VA Schools Lindsay
Middle
School
Improvements 








10,000,000
 60
Hampton VA Schools Syms
Middle
School
Improvements
(If
New
Construc3on
Is
Not
Funded) 








10,000,000
 60
Hampton VA Schools Davis
Middle
School
Renova3ons 








10,300,000
 80
Hampton VA Schools Phoebus
High
School
Improvements
 










1,550,000
 80
Hampton VA Schools Hampton
High
School
Renova3ons 










6,200,000
 120
Hampton VA Schools New
150,000
sq.
b.
PK‐8
School
Facility
for
1,000
Students 








43,570,000
 180
Hampton VA Schools Replacement
of
Syms
Middle
School,
Tyler
Elementary
School,
and
Langley
Elementary
School 








54,880,000
 180
City State Program Project
Descrip3on Funding
Required Jobs
Hampton VA Streets/Roads Pembroke
Avenue/Queen
Street
Drainage
Improvements,
Phase
2 












250,000
 5
Hampton VA Streets/Roads Traffic
Signal
Re3mings
Throughout
the
City 












260,000
 5
Hampton VA Streets/Roads Traffic
Sign
Replacement
Throughout
the
City 












300,000
 6
Hampton VA Streets/Roads E
Street
Improvements
in
Copeland
Industrial
Park 












400,000
 8
Hampton VA Streets/Roads Underwater
Repairs
to
Bridges 












500,000
 10
Hampton VA Streets/Roads Exis3ng/Substandard
Guardrail
Replacement/Upgrades 












540,000
 11
Hampton VA Streets/Roads Rawood
Stormwater
Deten3on 












710,000
 14
Hampton VA Streets/Roads Canal
Repairs 










1,000,000
 20
Hampton VA Streets/Roads Intersec3on
Improvements
Throughout
the
City 










1,100,000
 22
Hampton VA Streets/Roads Coliseum
North
Quality
Basin 










1,725,000
 35
Hampton VA Streets/Roads Lifle
England
Phase
3&4
Drainage
Improvements 










2,000,000
 40
Hampton VA Streets/Roads Span
Wire
to
Master
Arm
Conversions
Upgrades
(10
Conversions
Total) 










2,050,000
 41
Hampton VA Streets/Roads Mercury
Boulevard
Resurfacing
and
Rehabilita3on 










6,500,000
 130
Hampton VA Streets/Roads Resurfacing
Throughout
the
City,
Including
Arterial,
Collector
and
Residen3al
Roads 








15,000,000
 300
Hampton VA Water Pumping
Sta3on
Emergency
Isola3on
Valve
Project 












180,000
 4
Hampton VA Water Fats,
Oils,
Greases
(FOG)
Abatement
Program
‐
Start
Up
Costs
for
This
Mandated
Program 












225,000
 5
Hampton VA Water Crossroads
Pumping
Sta3on 










1,000,000
 20
Hampton VA Water Pumping
Sta3on
SCADA
System
Replacement 










1,200,000
 24
Hampton VA Water Pumping
Sta3on
Emergency
Generators/Bypass
Equipment 










1,500,000
 30
Hampton VA Water Collec3on
System
Hydraulic
Model
Project 










1,600,000
 32
Hampton VA Water Electrical
Upgrades
to
40
Terminal
Pump
Sta3ons
and
25
Variable
Frequency
Drives 










1,600,000
 32
Hampton VA Water Back
River
Dredging/Factory
Point
Restora3on 










5,000,000
 100
Hampton VA Water Infrastructure
Repair
to
the
City's
Sewer
System
to
Comply
with
State
and
Federal
Mandates 








71,500,000
 1430
Lynchburg VA CDBG Yoder
Neighborhood
Center
addi3on 












250,000
 15
Lynchburg VA CDBG BWC
athle3c
field
renova3on 












600,000
 25
Lynchburg VA CDBG Riverside
Park
renova3on,
phase
1 












700,000
 35
Lynchburg VA CDBG Ivy
Creek
Park
construc3on 










2,000,000
 50
Lynchburg VA CDBG Miller
Center
renova3on 










3,500,000
 50
Lynchburg VA CDBG Riverfront
Development
including
riverwalk 










9,800,000
 69
Lynchburg VA Energy Building
HVAC
Upgrades 










1,200,000
 23
Lynchburg VA Energy City/Schools
Energy
Audit
and
Upgrades 










1,500,000
 23
Lynchburg VA Energy Public
Works
Complex
Inprovements 








12,500,000
 23
Lynchburg VA Streets/Roads Retaining
wall
inventory
and
mapping 












375,000
 15
Lynchburg VA Streets/Roads Florida
Ave
Bridge
Replacement 












500,000
 23
Lynchburg VA Streets/Roads Grace
St
retaining
wall
improvements 










2,130,000
 23
Lynchburg VA Streets/Roads Guardrail
replacement 










1,000,000
 23
Lynchburg VA Streets/Roads Kanawa
Canal
Bridge
stabiliza3on 












300,000
 23
Lynchburg VA Streets/Roads Lynchburg
Expressway
overlay
and
safety
improvements 










5,200,000
 23
Lynchburg VA Streets/Roads Main
St
wall 












250,000
 23
Lynchburg VA Streets/Roads Reusen's
Rd
improvements 












275,000
 23
Lynchburg VA Streets/Roads Sidewalk
Replacement 










2,000,000
 23
Lynchburg VA Streets/Roads Street
Paving 










5,000,000
 23
Lynchburg VA Streets/Roads Trents
Ferry
Wall 














30,000
 23
Lynchburg VA Streets/Roads 12th
St
Corridor
improvements 










3,500,000
 46
Lynchburg VA Streets/Roads D
St
Bridge
Repair 










4,000,000
 46
Lynchburg VA Streets/Roads Forest
Brook
Rd
Improvements 














75,000
 46
Lynchburg VA Streets/Roads Kings
Dr
Improvements 












705,000
 46
Lynchburg VA Streets/Roads Main
St
Gateway
improvements 










1,500,000
 46
Lynchburg VA Streets/Roads Retaining
wall
replacement‐
BWC
and
6th
St) 










1,000,000
 46
Lynchburg VA Streets/Roads Breezewood
Dr,
Phase
2 










2,530,000
 69
Lynchburg VA Streets/Roads Kemper
St
bridge
replacement 










4,000,000
 69
Lynchburg VA Streets/Roads Lower
Bluffwalk 










5,000,000
 69
Lynchburg VA Streets/Roads Rivermont
Bridge
Repair 










5,000,000
 69
Lynchburg VA Streets/Roads Fibh
St
Improvements 










4,000,000
 92
Lynchburg VA Water 1.4MG
Water
Tank
Rehab 












500,000
 23
Lynchburg VA Water Blue
Ridge
Farms 










1,500,000
 23
Lynchburg VA Water Comprehensive
Storm
Sewer
Inventory
and
Maping 












500,000
 23
Lynchburg VA Water Confederate
Ave
water
line 












150,000
 23
Lynchburg VA Water Florida
Ave
Bridge 












130,000
 23
Lynchburg VA Water Jefferson
St
Phase
III
water 












280,000
 23
Lynchburg VA Water JRI
Div
2‐
Replace
4,000
feet
of
large
diameter
sewer. 








20,000,000
 23
Lynchburg VA Water JRI
Div
5‐
Replace
12,500
feet
of
large
diameter
sewer. 








15,000,000
 23
Lynchburg VA Water JRI
Div
6‐
Replace
6,000
of
large
diameter
sewer. 








10,000,000
 23
Lynchburg VA Water Knight
St
Small
Mains 












580,000
 23
Lynchburg VA Water Leesville
Sewer
Extension 












150,000
 23
Lynchburg VA Water Misc.
Sewer
Extension
Projects 












200,000
 23
Lynchburg VA Water Moreview
Sewer
Extension 












350,000
 23
Lynchburg VA Water Old
Forest
Road
Water 












475,000
 23
Lynchburg VA Water Patrick
and
York
Small
Mains 












630,000
 23
Lynchburg VA Water Pedlar
Dam
Improvements 










1,000,000
 23
City State Program Project
Descrip3on Funding
Required Jobs
Lynchburg VA Water Town
Crier‐
Water
main
replacement. 














30,000
 23
Lynchburg VA Water Villas
at
Stone
Mill
PRV 














55,000
 23
Lynchburg VA Water Wards
Ferry
Culvert 












400,000
 23
Lynchburg VA Water CSO
16.3 










4,000,000
 35
Lynchburg VA Water CSO
1A5 










3,600,000
 35
Lynchburg VA Water CSO
1B4.1‐
Separate
residen3al
sewers. 










5,400,000
 35
Lynchburg VA Water CSO
1D3 










6,000,000
 35
Lynchburg VA Water CSO
1D3.1B‐
Separate
residen3al
sewers. 










3,500,000
 35
Lynchburg VA Water CSO
1D3.2 










7,000,000
 35
Lynchburg VA Water CSO
2.2‐
Separate
residen3al
sewers. 










4,000,000
 35
Lynchburg VA Water Midtown
Connector 










1,500,000
 35
Norfolk VA CDBG Install
ADA
Ramps 












200,000
 15
Norfolk VA CDBG Cecilia
Street
Replacement 










4,000,000
 40
Norfolk VA CDBG Consruct
Bay
Oaks
Park 










6,000,000
 60
Norfolk VA CDBG NRHA
Facili3es
Consolida3on 








10,000,000
 100
Norfolk VA Energy Install
Programmable
Thermostats
in
City
Hall 












250,000
 3
Norfolk VA Energy Implement
traffic
signal
LED
lamp
replacement
project
at
City
Hall. 












200,000
 12
Norfolk VA Energy Install
Direct
Digital
Controls
on
several
facili3es
across
the
City

Tarrallton
Recrea3on
Center

Vivian
C.
Mason
Granby
Municipal
Center 












200,000
 18
Norfolk VA Energy School
Administra3on
Building
–
replace
exis3ng
ligh3ng
in
this
13
story
building
with
energy
efficient
T‐5
lights













600,000
 25
Norfolk VA Energy City
Hall
Building
–
replace
the
exis3ng
ligh3ng
in
the
11
story
building
with
energy
efficient
T‐5
lights 












600,000
 35
Norfolk VA Energy Replace
the
main
hea3ng
and
cooling
system
with
an
energy
efficient
geo‐thermal
central
system
at
the
Van

Wyck
Library. 












275,000
 40
Norfolk VA Energy Vector
Control
Building
–
replace
the
main
hea3ng
and
cooling
system,
a
boiler
and
through
the
wall
spot

cooler
air
condi3oning
system
with
an
energy
efficient
geo‐thermal
central
system 












255,000
 40
Norfolk VA Energy Central
Energy
Plant‐
replace
combus3on
equip
and
install
controls
for
max
efficiency
and
install
heat

exchanger 










1,073,000
 42
Norfolk VA Energy Park
Place
Mul3‐purpose
Center
–
the
exis3ng
HVAC
system
is
composed
of
an
electric
boiler
and
cooling

tower
providing
water
to
40
Florida
heat
pumps.
This
project
will
add
direct
digital
controls
to
the
units
and

replace
the
boiler
and
tower
with
an
en 












625,000
 46
Norfolk VA Energy Replace
47
year
old
coils,
install
variable
speed
drives,
and
replace
condensing
units
in
City
Hall. 












633,000
 55
Norfolk VA Energy Replace
the
main
hea3ng
and
cooling
system
in
the
Seaboard
Building.

Add
direct
digital
controls
to
the

facility,
replace
the
main
hea3ng
and
cooling
plant,
and
repair
all
main
air
handlers. 










1,582,000
 125
Norfolk VA Energy Norfolk
Public
Schools
Energy
Conserva3on
Plan
Implementa3on
 








25,947,614
 150
Norfolk VA Housing Install
security
cameras,
infrastructure,
and
monitoring
sta3ons
in
public
housing
neighborhoods 










5,500,000
 10
Norfolk VA Housing Install
new
energy
efficient
windows
at
Calvert
Park 












850,000
 15
Norfolk VA Housing Modernize
electrical
infrastructure
in
Young
Terrace 












800,000
 15
Norfolk VA Housing Install
new
air
handlers
in
each
apartment
and
new
mechanical
room
at
Sykes
Senior
Midrise 










1,170,000
 20
Norfolk VA Housing Restore
approx
1600
b.
of
shoreline
on
eastern
branch
of
Elizabeth
River 










1,500,000
 20
Norfolk VA Housing Construct
new
roads,
parking
layout,
and
streetscape
improvements
at
Oakleaf
Forest
Housing
Site 










3,000,000
 30
Norfolk VA Housing Install
energy
efficient
windows,
rehabilitate
hea3ng,
shore
up
founda3ons
and
erosion
control
at
Tidewater

Gardens 










3,120,000
 50
Norfolk VA Housing Redevelop
Moton
Circle
Neighborhood 










5,000,000
 55
Norfolk VA Public
Safety ICx
Tac3cal
Plazorms
(2)
 












240,000
 5
Norfolk VA Public
Safety Install
Gunshot
Detec3on/Video
Camera
System
in
select
high
crime
areas 












610,000
 5
Norfolk VA Public
Safety Purchase
and
implement
E‐Summonsing
sobware
and
equipment 












300,000
 5
Norfolk VA Public
Safety Renovate
aging
Emergency
Communica3ons
Center
Common
areas,
restrooms,
and
lounge 












120,000
 5
Norfolk VA Public
Safety Install
video
conferencing
equipment,
smart
traffic
data
feed,
wireless
portable
camera/monitoring,
coplogic

on‐line
ci3zen
repor3ng
technology,
and
EOC
technology
enhancements 












336,500
 16
Norfolk VA Public
Safety Construct
and
establish
a
Curfew
Assessment
Center 










1,500,000
 25
Norfolk VA Public
Safety Upgrade
obsolete
Emergency
Communica3ons
Center
analog
911
phone
system
with
digital. 












700,000
 25
Norfolk VA Public
Safety Expand
and
renovate
the
Emergency
Communica3ons
Center
to
include
18
addi3onal
response
sta3ons,

and

training
room.
 












500,000
 30
Norfolk VA Public
Safety Construct
a
new
2nd
Precinct
Police
Facility
 








18,900,000
 60
Norfolk VA Schools Ocean
View
Elementary
School
Addi3on 










3,612,000
 12
Norfolk VA Schools Ingleside
Elementary
School
Addi3on 










4,370,000
 15
Norfolk VA Schools St.
Helena
Elementary
School
Renova3on 










4,803,000
 16
Norfolk VA Schools Tidewater
Park
Elementary
School
Addi3on 










4,803,000
 16
Norfolk VA Schools Oakwood
Elementary
School
Renova3on 










5,735,000
 19
Norfolk VA Schools Direct
Fiber
Link
to
ODU,
TCC,
NSU,
and
the
City
of
Norfolk 












250,000
 20
Norfolk VA Schools Sewells
Point
Elementary
School
Addi3on 










6,234,000
 21
Norfolk VA Schools Tidewater
Park
Elementary
School
Renova3on 










6,722,000
 22
Norfolk VA Schools Fairlawn
Elementary
School
Addi3on 










6,991,000
 23
Norfolk VA Schools Ocean
View
Elementary
School
Renova3on 










7,984,000
 27
Norfolk VA Schools Sewells
Point
Elementary
School
Renova3on 










8,022,000
 27
Norfolk VA Schools Fairlawn
Elementary
School
Renova3on 










8,513,000
 28
Norfolk VA Schools St.
Helena
Elementary
School
Addi3on 










8,564,000
 29
Norfolk VA Schools Campostella
Elementary
Renova3on 










5,000,000
 30
Norfolk VA Schools Ingleside
Elementary
School
Renova3on 








11,017,000
 37
Norfolk VA Schools Lindenwood
Elementary
School
Replacement 








18,537,000
 62
Norfolk VA Schools Sherwood
Forest
Elementary
School
Replacement 








18,537,000
 62
City State Program Project
Descrip3on Funding
Required Jobs
Norfolk VA Schools Lake
Taylor
High
School
Renova3on 








19,781,000
 66
Norfolk VA Schools Northside
Middle
School
Renova3on 








19,781,000
 66
Norfolk VA Schools Construct
Crossroads
Elementary
Replacement 








33,000,000
 70
Norfolk VA Schools Constructe
Rosemont
Elementary
Replacement 








35,000,000
 70
Norfolk VA Schools Replace
Schools'
Warehouse
and
Food
Prepara3on
Facility 








25,000,000
 75
Norfolk VA Schools Replace
and
Consolidate
5
Alterna3ve
Schools 








35,000,000
 80
Norfolk VA Schools Lake
Taylor
Middle
School
Renova3on 








49,283,000
 164
Norfolk VA Streets/Roads Downtown
Crosswalks
on
Main
Street
and
Pedestrian
Safety
Improvements 












900,000
 20
Norfolk VA Streets/Roads East
Ocean
View
Storm
Drainage
Improvements 










2,000,000
 20
Norfolk VA Streets/Roads Fairmont
Park,
streets,
sidewalks,
and
drainage 










2,500,000
 20
Norfolk VA Streets/Roads St.
Paul's
median
and
pedestrian
safety
and
parking
acess
improvements 












900,000
 20
Norfolk VA Streets/Roads Lifle
Creek
Road
and
Merrif
Street
Traffic
Signal 












300,000
 21
Norfolk VA Streets/Roads Lifle
Creek
Road
and
Traffic
Signal 










3,300,000
 25
Norfolk VA Streets/Roads Ocean
View
Avenue
Improvements
(7th
View
to
15th
View) 










2,250,000
 25
Norfolk VA Streets/Roads Virginia
Beach
Blvd
Improvements
(Ballen3ne
to
Tidewater) 












750,000
 25
Norfolk VA Streets/Roads Jamestown
Crescent
Culvert
Replacement 












500,000
 30
Norfolk VA Streets/Roads Lower
Hampton
Blvd
Improvements 










1,400,000
 30
Norfolk VA Streets/Roads Raise
Brambleton
Ave
Eleva3on
between
Colley
Ave
and
Smith
Creek 










1,800,000
 30
Norfolk VA Streets/Roads Terminal
Blvd
Improvements
(Hampton
Blvd
to
Ruthven) 










3,500,000
 30
Norfolk VA Streets/Roads Five
Points
Intersec3on
Wayfinding
Improvements 












500,000
 32
Norfolk VA Streets/Roads Lower
Hampton
Blvd
Improvements 










3,000,000
 35
Norfolk VA Streets/Roads Brambleton
Ave
Safetyand
Median
Improvements 










1,750,000
 40
Norfolk VA Streets/Roads Fort
Norfolk
Gateway—Brambleton
Ave
and
Colley
Ave
Intersec3on 










3,200,000
 45
Norfolk VA Streets/Roads Soundwall
Improvements—Phase
III 










1,500,000
 45
Norfolk VA Streets/Roads Mason
Creek
Bridge
Replacement
and
Norview
Avenue
Airport
Bridge
Rehabilita3on 










1,540,000
 50
Norfolk VA Streets/Roads Midtown
Tunnel
Improvements 








10,000,000
 300
Norfolk VA Transit Government
Sta3on
and
City
Hall
Plaza
Light
Rail
Improvements 












250,000
 15
Norfolk VA Transit Purchase
Informa3on
Management
System
for
real
3me
bus
displays,
video
conferencing,
mobile
training

system,
and
hazard/risk
mgt.
system
for
bus
and
rail 












385,000
 15
Norfolk VA Transit Light
Rail
Landscaping
Improvements 












400,000
 20
Norfolk VA Transit Bus
Replacement
for
10
(40b)
Diesel
and
10
(29b)
Hybrid 








10,789,680
 25
Norfolk VA Transit Light
Rail
Infrastructure
Reloca3on 










1,500,000
 25
Norfolk VA Transit Harbor
Park
Bus
Transfer
Sta3on 












500,000
 30
Norfolk VA Transit Replace
11
underground
storage
tanks
at
transit
facility 












600,000
 30
Norfolk VA Transit Light
Rail
Parking
Structure
at
Military
Hwy 










2,000,000
 35
Norfolk VA Transit Light
Rail
Parking
Structure
at
Newtown
Road 










3,000,000
 35
Norfolk VA Transit Salter
Street
Bus
Transfer
Sta3on 












550,000
 35
Norfolk VA Transit Light
Rail
Access,
Ligh3ng,
and
Pedestrain
Sabey
Improvements 










2,350,000
 55
Norfolk VA Transit Southside
Transit
Opera3ng
and
Maintenance
Facility
Replacement 








16,300,000
 185
Norfolk VA Water Standby
Bypass
Pumps
to
reduce
sanitary
sewer
overflow
‐
Adds
permanently‐mounted
bypass
pumps
to

cri3cal
sanitary
sewer
pump
sta3ons
to
prevent
sanitary
sewer
overflows
and
their
health
risks
to
the
public 












500,000
 10
Norfolk VA Water Ocean
View
&
Berkley
Tank
Elevated
Water
Tank
Booster
Pump
Sta3ons
‐
Adds
booster
pump
sta3ons
to
the

Ocean
View
and
Berkley
water
tanks
to
provide
addi3onal
water
pressure
and
flows
for
fire
protec3on 










1,000,000
 15
Norfolk VA Water Hampton
Boulevard
Water
Main
Replacement
‐
Replacement
of
2,000
linear
foot
of
24‐inch
water
main
which

has
experienced
mul3ple
failures.

This
main
provides
water
to
Norfolk
Naval
Sta3on 










1,000,000
 20
Norfolk VA Water Central
Brambleton
Phase
III
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer

in
Central
Brambleton
neighborhood 










1,500,000
 28
Norfolk VA Water Central
Brambleton
Phase
IV
Water
Upgrade
‐
Replace
and
upgrade
failing
water
in
Central
Brambleton

neighborhood 










1,500,000
 28
Norfolk VA Water Colonial
Place
Phase
II
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in

Colonial
Place
neighborhood 










1,500,000
 28
Norfolk VA Water Park
Place
Phase
IV
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in
Park

Place
neighborhood 










1,500,000
 28
Norfolk VA Water Chesterfield
Heights
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in

Chesterfield
Heights
neighborhood 










2,000,000
 35
Norfolk VA Water Fairmont
Park
Phase
7
Water
and
Sewer
Replacement
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer

in
Fairmount
Park
neighborhood 










2,000,000
 35
Norfolk VA Water Huntersville
Phase
III
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in

Huntersville
neighborhood 










2,000,000
 35
Norfolk VA Water Flood
Protec3on
at
Nofoway
&
Blackwater
Raw
Water
Pumping
Sta3on
‐
Shoreline
stabiliza3on
and

replacement
of
exis3ng
bulkheads
for
two
raw
water
pumping
sta3ons
that
provide
a
por3on
of
drinking
water

to
southeastern
Virginia 










2,000,000
 40
Norfolk VA Water Fort
Norfolk
Water
&
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in
Fort
Norfolk

neighborhood 










3,000,000
 50
Norfolk VA Water Replace
Raw
Water
Mains
in
Various
Loca3ons
‐
3
projects
total
to
replace
(1)
3,000
linear
foot
of
36‐inch
raw

water
by
Western
Branch
Pumping
(2)
800
linear
foot
of
36‐inch
raw
water
in
Western
Branch
(3)
2,000
linear

foot
of
raw
water
on
Craney
Island 










4,000,000
 60
Norfolk VA Water 37th
Street
Water
Treatment
Plant
Upgrade
‐
Replace
and
rehab
por3ons
of
the
60‐year
old
treatment
plant. 








10,000,000
 150
Onancock VA Water Wastewater
Treatment
Plant
Upgrade.

Upgrading
aging
plant
to
meet
pollutant
removal
requirements
and

capacity
needs.

Par3al
funding
already
sucured.

 










7,430,725
 12
Roanoke VA Streets/Roads Franklin
Road
Bridge
Repairs 












250,000
 15
Roanoke VA Streets/Roads Public
Works
Service
Center
Improvements 












350,000
 20
Roanoke VA Streets/Roads Main
Street
Bridge
Repairs 












300,000
 25
City State Program Project
Descrip3on Funding
Required Jobs
Roanoke VA Streets/Roads Walnut
Avenue
Bridge
Repairs 












350,000
 25
Roanoke VA Streets/Roads Phase
XVI
Curb
and
Sidewalk 












700,000
 30
Roanoke VA Streets/Roads Reserve
Avenue
Streetscape 












500,000
 30
Roanoke VA Streets/Roads Four
Bridge
Replacements 










1,700,000
 100
Virginia
Beach VA CDBG West
Neck
Creek
Natural
Area 












528,000
 12
Virginia
Beach VA CDBG Neighborhood
Park
Renova3ons 












720,000
 16
Virginia
Beach VA CDBG Recrea3on
Center
Security
Ligh3ng 












300,000
 17
Virginia
Beach VA CDBG Park
Shelter
Replacements 












854,000
 19
Virginia
Beach VA CDBG Bow
Creek
Recrea3on
Center
Locker
Room
Renova3ons 












250,000
 23
Virginia
Beach VA CDBG Kempsville
Recrea3on
Center
Pool
Area
Repairs 












400,000
 24
Virginia
Beach VA CDBG Marshview
Park
Development 










1,376,000
 29
Virginia
Beach VA CDBG Recrea3on
Center
Recep3on
Area 












350,000
 29
Virginia
Beach VA CDBG Kid's
Cove
Playground
Replacement 










1,600,000
 34
Virginia
Beach VA CDBG Park
Bank
Stabiliza3on
(11
parks) 










1,650,000
 35
Virginia
Beach VA CDBG Tennis
Court
Replacements 










1,800,000
 38
Virginia
Beach VA CDBG Park
Water
Quality
Improvements 










2,000,000
 41
Virginia
Beach VA CDBG Lake
Smith
Natural
Area
Phase
I 










2,000,000
 42
Virginia
Beach VA CDBG Sportsplex
Deferred
Maintenance 










2,300,000
 47
Virginia
Beach VA CDBG Seatack
Community
Center
Expansion 










2,200,000
 48
Virginia
Beach VA CDBG Stumpy
Lake
Natural
Area
Phase
I 










2,500,000
 51
Virginia
Beach VA CDBG Lynnhaven
Inlet
Naviga3on
Dredging 










2,000,000
 55
Virginia
Beach VA CDBG New
Asphalt
Trail
Development 










2,640,000
 55
Virginia
Beach VA CDBG Sidewalk
Improvements 










3,000,000
 62
Virginia
Beach VA CDBG Resort
Beach
Hurricane
Protec3on 








18,000,000
 65
Virginia
Beach VA CDBG Sandbridge
Beach
Hurricane
Protec3on 








18,000,000
 65
Virginia
Beach VA CDBG Urban
Tree
Canopy
Protec3on 










3,750,000
 76
Virginia
Beach VA CDBG Trail
Repairs
and
Replacements 










3,960,000
 80
Virginia
Beach VA CDBG North
Virginia
Beach
61st
Street
Pump
Sta3on 








20,000,000
 83
Virginia
Beach VA CDBG Rosemont
Forest
Pump
Sta3on 










8,000,000
 83
Virginia
Beach VA CDBG Parking
Lot
Repairs
and
Replacements
(11
sites) 










4,450,000
 92
Virginia
Beach VA CDBG Replacement
of
Park
Buildings 










4,922,000
 100
Virginia
Beach VA CDBG Thalia
Creek
Greenway 










7,000,000
 142
Virginia
Beach VA CDBG 5K
Loop
Trail
Facility 










9,600,000
 194
Virginia
Beach VA CDBG Open
Space
Acquisi3on 








17,677,600
 355
Virginia
Beach VA CDBG Williams
Farm
Community
Recrea3on
Center 








30,000,000
 640
Virginia
Beach VA Energy Central
Plant
Cooling
Tower
and
Chiller
Renova3on 










1,000,000
 13
Virginia
Beach VA Energy Central
Plant
Pumps
Moderniza3on 












225,000
 13
Virginia
Beach VA Energy Shore
Drive/Pacific
Avenue
Solar
Powered
Flashing
Lights 












110,000
 22
Virginia
Beach VA Public
Safety Correc3on
Center
Roof 












700,000
 24
Virginia
Beach VA Public
Safety K‐9
Building 












553,000
 34
Virginia
Beach VA Public
Safety Fire
Sta3on
#9
Repairs 












800,000
 44
Virginia
Beach VA Public
Safety Creeds
Training
Simula3on
City 












500,000
 46
Virginia
Beach VA Public
Safety Animal
Control
Facility 










4,000,000
 56
Virginia
Beach VA Public
Safety Fire
and
Rescue
Sta3on
‐
Thalia 










6,365,000
 102
Virginia
Beach VA Schools College
Park
Elementary 








22,392,750
 200
Virginia
Beach VA Schools Pupil
Transporta3on
Services 








19,850,001
 200
Virginia
Beach VA Schools Great
Neck
Middle
School 








62,549,253
 500
Virginia
Beach VA Schools Kellam
High
School 






102,000,000
 500
Virginia
Beach VA Streets/Roads First
Colonial
Road/
Old
Dona3on
Parkway 














75,000
 7
Virginia
Beach VA Streets/Roads Virginia
Beach
Boulevard/
Cons3tu3on
Drive 














42,000
 7
Virginia
Beach VA Streets/Roads Traffic
Signal
Interconnect
Installa3on 














35,000
 11
Virginia
Beach VA Streets/Roads Independence
Boulevard/
Ewell
Road 














10,000
 12
Virginia
Beach VA Streets/Roads Avalon
Avenue 










1,650,000
 14
Virginia
Beach VA Streets/Roads Bonney
Road/Kentucky
Avenue 










1,500,000
 14
Virginia
Beach VA Streets/Roads Elbow
Road/Indian
River
Road 












850,000
 14
Virginia
Beach VA Streets/Roads Godspeed
Road 












585,000
 14
Virginia
Beach VA Streets/Roads West
Neck
Road
Interim
‐
Phase
I 










1,400,000
 14
Virginia
Beach VA Streets/Roads Witchduck
Road
Phase
I 








27,487,000
 24
Virginia
Beach VA Streets/Roads Baker
Road 










3,225,000
 26
Virginia
Beach VA Streets/Roads Buckner
Boulevard
Extended 










2,421,000
 26
Virginia
Beach VA Streets/Roads Cons3tu3on
Drive
Extended 










9,176,912
 48
Virginia
Beach VA Streets/Roads Lynnhaven
Interna3onal 










7,800,000
 48
Virginia
Beach VA Streets/Roads Princess
Anne
Road
Phase
IV 








43,900,000
 48
Virginia
Beach VA Streets/Roads Seaboard
Road 










7,299,000
 48
Virginia
Beach VA Streets/Roads Shore
Drive
Corridor
Improvements
Phase
II 








11,100,000
 48
Virginia
Beach VA Streets/Roads Shore
Drive
Corridor
Improvements
Phase
III 










9,360,000
 48
Virginia
Beach VA Streets/Roads Shore
Drive
Corridor
Improvements
Phase
IV 








11,700,000
 48
Virginia
Beach VA Streets/Roads Citywide
Streetlight
Upgrade 












500,000
 54
Virginia
Beach VA Streets/Roads Major
Bridge
Rehabilita3on 










1,100,000
 54
City State Program Project
Descrip3on Funding
Required Jobs
Virginia
Beach VA Streets/Roads Primary
System
Infrastructure
Improvements 










3,500,000
 54
Virginia
Beach VA Streets/Roads Princess
Anne
Road
Phase
VII 








17,800,000
 60
Virginia
Beach VA Streets/Roads Virginia
Aquarium
Elevated
Pedestrian
Crosswalk 










4,900,000
 84
Virginia
Beach VA Streets/Roads Storm
Water
Infrastructure
Rehabilita3on
/
Princess
Anne
Plaza 










6,000,000
 104
Virginia
Beach VA Streets/Roads Street
Reconstruc3on 










5,000,000
 104
Virginia
Beach VA Streets/Roads Traffic
Signal
Rehabilita3on 








11,000,000
 104
Virginia
Beach VA Streets/Roads Lynnhaven
Parkway
Phase
XI 








31,500,000
 210
Virginia
Beach VA Streets/Roads Holland
Road
Phase
VI 








45,000,000
 304
Virginia
Beach VA Streets/Roads Pavement
Maintenance
Program
Phase
II 








45,000,000
 304
Virginia
Beach VA Streets/Roads Laskin
Road
Phase
I 








76,000,000
 365
Virginia
Beach VA Streets/Roads Lesner
Bridge
Replacement 








90,000,000
 520
Virginia
Beach VA Streets/Roads Nimmo
Parkway
Phase
V 








61,700,000
 520
Virginia
Beach VA Water Public
U3li3es
Public
Access
Renova3ons
‐
Building
2 












300,000
 15
Virginia
Beach VA Water Silina
Corvefe
Pump
Sta3on
#511 












500,000
 15
Virginia
Beach VA Water Regency
Apartments
Pump
Sta3on
#260 










1,000,000
 18
Virginia
Beach VA Water Lake
Edward
West
Pump
Sta3on
#343 










1,000,000
 19
Virginia
Beach VA Water Green
Run
Garden
Pump
Sta3on
#547 










1,500,000
 20
Virginia
Beach VA Water Green
Run/Crimson
Holly
Pump
Sta3on
#549 










1,000,000
 20
Virginia
Beach VA Water Stumpy
Lake
Dam
and
Spillway
Repairs 










1,930,000
 24
Virginia
Beach VA Water College
Park
Providence
Road
Pump
Sta3on
#425
Abandonment
and
SS
Realignment 










2,800,000
 30
Virginia
Beach VA Water SA
#403
Arrowhead
Susquehanna
Sanitary
Sewer
Rehabilita3on
Phase
1 










2,800,000
 37
Virginia
Beach VA Water Landstown
Yard
Improvements 








55,000,000
 71
Burlington VT Airport Expansion
of
Airport
Industrial
Park 










2,000,000
 48
Burlington VT Airport Avia3on
Technical
Center 










9,000,000
 216
Burlington VT CDBG Waterfront
tent
and
speaker
system
needed
for
events 












250,000

Burlington VT CDBG Memorial
Auditorium
rehab:
replacement
needed
for
bleachers
and
portable
sea3ng
system,
and
electrical

upgrade 












780,000
 2
Burlington VT CDBG vacant
retail
renova3ons 












200,000
 2
Burlington VT CDBG CarShare
VT
(non‐profit
car‐sharing
program)
start‐up
capital
to
purchase
8
vehicles
and
hire
4
staff; 












450,000
 4
Burlington VT CDBG Brownfields
clean
up 












500,000
 9
Burlington VT CDBG Upper
story
redevelopment
downtown 










1,000,000
 18
Burlington VT CDBG Church
Street
(downtown
business
district)
improvements:
street
crossing
improvements,
benches,
trees,
brick

cobbles,
bike
racks,
canopies,
banner
system
and
north
and
south
gateways 












925,000
 22
Burlington VT CDBG Complete
build‐out
of
bike
lanes
and
related
ameni3es
in
the
City 










1,000,000
 24
Burlington VT CDBG Structural
improvements
to
downtown
(College
Street)
parking
garage 










1,000,000
 24
Burlington VT CDBG Business
loans 










2,000,000
 26
Burlington VT CDBG Construct
ADA‐accessible
curb
ramps 










1,100,000
 26
Burlington VT CDBG Median
work
on
Main
Street
to
funnel
pedestrians
to
appropriate
crossings,
maintain
traffic
visibility,
and
serve

as
gateway
to
city
for
visitors. 










1,200,000
 29
Burlington VT CDBG Redevelopment
of
decommissioned
(Moran)
waterfront
power
plant 










3,000,000
 80
Burlington VT CDBG Waterfront
Bike
path
reconstruc3on 










3,500,000
 84
Burlington VT CDBG Retrofit
of
manufacturing
site/building
(Blodgef) 








10,000,000
 180
Burlington VT Energy Compressed
natural
gas
public
fueling
sta3on 










2,000,000

Burlington VT Energy Garage
ligh3ng
energy
retrofit 












100,000
 2
Burlington VT Energy “DEED”
start‐up
project
to
establish
loan
fund
for
home
energy
efficiency
and
alterna3ve
energy
projects;
long‐
term
loans
connected
to
property
and
not
property
owner,
as
incen3ve
for
energy
projects
regardless
of
how

long
property
is
owned. 












250,000
 4
Burlington VT Energy Solar
Ci3es
Ini3a3ve:
pilot
project
to
establish
several
solar
electric
genera3ng
loca3ons
across
City 












770,000
 7
Burlington VT Energy Moran
Center
energy
efficiency
and
alterna3ve
energy
development 










1,000,000
 13
Burlington VT Energy Public
building
energy
retrofit 










2,000,000
 26
Burlington VT Energy Business
Energy
Efficiency
Program 










5,000,000
 65
Burlington VT Energy District
energy
pilot
project 








15,000,000
 225
Burlington VT Housing 10
North
Champlain
Street‐Champlain
Apts:
Range
Replacements,
Kitchen
Renova3ons,
Closet
Door
Upgrades 












255,300

Burlington VT Housing 1554
North
Avenue‐Franklin
Square:
Fire
Alarm
Upgrade,
Roof
Trim
Pain3ng 












100,784

Burlington VT Housing 230
St.
Paul
Street‐Decker
Towers:Hea3ng
System
Conversion
to
Gas,
Tub
Drains/Faucet
Repair,
Parking
Lot

Asphalt
Repairs,
Stucco
Siding
Replacement 












866,244

Burlington VT Housing 669
Riverside
Avenue:
Bathroom
Flooring
Replacement,
Handicap
Ramp
Replacement,
Refrigerator

Replacement
Toilet
Replacement 












103,620

Burlington VT Housing Hillside
Terrace:
Exterior
Pain3ng,
Kitchen
Cabinets/Countertops/Sink
Replacements,
Tub/Shower
unit

Replacements,
Walkway/Driveway
Repairs,
French
Door
Replacements 












264,491

Burlington VT Public
Safety Portable
Radios.
Complete
a
project
that
has
been
underway
to
bring
all
radios
to
APCO
P25
compliance
for

interoperability.
Requires
the
purchase
of
70
addi3onal
portable
radios
at
$3,000
each 












210,000

Burlington VT Public
Safety Volunteers
in
Service
to
Policing
Coordinator.
Crea3on
of
one
posi3on
to
coordinate
and
supervise
the

Volunteers
in
Service
to
Policing
Program.
By
crea3ng
a
new
civilian
posi3on,
sworn
law
enforcement
resources

would
be
freed
from
this
responsibility 














60,000
 1
Burlington VT Public
Safety Community
Service
Officer 












120,000
 2
Burlington VT Public
Safety Social
Service
Prac33oner
(Law
Enforcement
Support).
Crea3on
of
two
new
posi3ons
specializing
in
mental

health
and
substance
abuse
interven3on
to
respond
during
the
ini3al
call/emergency.
A
collateral
effect
of
this

program
would
be
to
reduce
the
nu 












120,000
 2
Burlington VT Schools Flynn
Elementary
School:
new
roof
and
insula3on 












200,000
 2
Burlington VT Schools Energy
efficiency
improvements
at
one
elementary
school
(Barnes) 












750,000
 9
Burlington VT Schools Hunt
Middle
School:
repair
failing
exterior
brick
walls 










1,200,000
 16
City State Program Project
Descrip3on Funding
Required Jobs
Burlington VT Schools Replace
1950s
boilers,
mechanical
HVAC
equipment
replacement
and
install
heat
recovery
roobop
units
at
one

elementary
school
(Barnes) 










1,400,000
 19
Burlington VT Schools Wheeler
Elementary
School:
remove
exis3ng
univen3lators;
install
heat
recovery
units;
new
controls
and

converters;
convert
exis3ng
steam
boilers
to
hot
water. 










1,330,000
 19
Burlington VT Schools Accessibility/ADA
improvements
at
one
elementary
and
one
middle
school
(Edmunds) 










1,500,000
 20
Burlington VT Schools City
high
school
construc3on
and
improvements:
1964
auditorium
needs
to
be
updated
for
a
high
school
of

1200
students;
various
code
viola3ons
addressed;
will
put
in
over
800
new
seats,
new
electrical,
new
ligh3ng,

new
HVAC
systems;
ADA
accessibility 










1,500,000
 20
Burlington VT Schools Flynn
Elementary
School:
mechanical
HVAC
equipment
replacement;
replace
three
1950s
boilers
with
high

efficiency
water
boilers;
install
heat
recovery
roobop
units;
remove
asbestos
insula3on;
install
new
controls 










1,720,000
 23
Burlington VT Streets/Roads Improving
access
to
Waterfront:Funicular
to
Waterfront 










2,500,000
 30
Burlington VT Streets/Roads Improving
access
to
Waterfront:
Bafery
Street
improvements 










1,800,000
 43
Burlington VT Streets/Roads Improving
access
to
Waterfront:
Depot
Street
(from
North
Ave
to
Waterfront)
streetscape 










2,000,000
 48
Burlington VT Streets/Roads Other
major
thoroughfare
road
improvements:
Main
Street
improvements
between
St.
Paul
St
and
Winooski

Ave 










3,000,000
 72
Burlington VT Streets/Roads Improving
access
to
Waterfront:
Site
work
at
the
Moran
Center
at
Waterfront
Park 










4,000,000
 96
Burlington VT Streets/Roads Improving
access
to
Waterfront:
Parking
deck
in
Pease
Grain
lot 










6,000,000
 144
Burlington VT Streets/Roads Other
major
thoroughfare
road
improvements:Winooski
Ave
improvements
between
Main
Street
and
Pearl

Street 










6,000,000
 144
Burlington VT Streets/Roads Downtown
streetscape
improvement
on
the
side
streets
extending
from
outdoor
pedestrian
mall/Church

Street 










8,000,000
 192
Burlington VT Streets/Roads Buildout
of
contract
2
for
Southern
Connector/Champlain
Parkway;
roadway
to
relieve
current
neighborhood

traffic
impacts 








12,000,000
 288
Burlington VT Transit Installa3on
of
Intelligent
Transporta3on
System
for
transit
system 










3,000,000

Burlington VT Transit Purchase
of
12
clean
diesel
transit
buses 










4,000,000

Burlington VT Transit Construc3on
of
transit
shelters 












500,000
 12
Burlington VT Transit Full
construc3on
of
Downtown
Transit
Center 








10,000,000
 240
Burlington VT Water Water
Plant
Equipment/Instrumenta3on
Upgrade 












350,000
 8
Burlington VT Water Combined
Sewer
Overflow
Reduc3on 












750,000
 18
Burlington VT Water Water
Main
Replacement,
South
Cove
Road 












750,000
 18
Burlington VT Water Mouth
of
the
River
Sewer
Project 










1,000,000
 24
Burlington VT Water Winooski
River
Siphon
Crossing 










1,700,000
 42
Burlington VT Water Main
Wastewater
Plant
Solids
Dewatering
Upgrade 










2,000,000
 48
Auburn WA Airport Resurface
the
25
yr
old
runway
at
Dick
Scobee
Aiprtport.
3rd
busiest
commuter
airport
in
the
Puget
Sound

area.
This
is
an
enterprise
fund
owned
and
operated
by
the
City.
Project
ready
to
begin
in
90
days.
One
of

lowest
average
income
ci3es
in
the
county. 












121,000
 12
Auburn WA Airport Security
Access/Fencing.
Dick
Scobee
Airport
is
an
enterprise
center
owned
and
operated
by
the
City.
This
is

the
third
busiest
commuter
airport
in
the
Puget
Sound
region.
Project
ready
to
begin
in
90
days.
One
of
lowest

average
income
ci3es
in
the
county 












120,000
 15
Auburn WA CDBG
Auburn WA CDBG Arterial
Guardrail
and
Clearzone
Improvement
Project.

One
of
lowest
average
income
ci3es
in
the
county.
This

project
has
been
through
the
plannng
process
and
is
ready
and
can
start
within
90
days. 










1,125,000
 11
Auburn WA CDBG Backup
Bafery
System
City
Traffic
Signals
for
public
safety.One
of
lowest
average
income
ci3es
in
the

county.This
project
is
ready
and
can
start
within
90
days. 












660,000
 16
Auburn WA CDBG Fund
four
hybrid
Parks
shufles
for
access
for
youth
to
the
gym,
commununity
center,
YMCA
and
other

facili3es.
Purchase
of
the
vehicles
allows
the
Parks
Department

to
program
facili3es
and
provide
for
addi3onal

city
staff
at
city
sites
and
allows
othe 












240,000
 22
Auburn WA CDBG Channeliza3on
Project
at
M
St
SE.
This
project
re‐arranges
a
key
intersec3on
in
a
core
area
of
the
city
and

means
an
immediate
traffic
improvement
to
our
downtown
and
community
college.
Project
fully
designed
and

ready
to
proceed
in
90
days. 












250,000
 25
Auburn WA CDBG Replace
the
1973
HVAC
system
and
ligh3ng
at
City
Hall
with
green
technology
including
sensors,
natural

ligh3ng
and
LEED
features.
This
project
is
fully
designed
and
ready
to
start
start
within
90
days 












850,000
 28
Auburn WA CDBG 15th
Street
SW
Repair
Truck
corridor.
This
project
is
fully
designed
and
ready
to
begin
in
90
days.
One
of
lowest

average
income
ci3es
in
the
county. 












165,000
 38
Auburn WA CDBG West
Main
Street
Truck
Corridor
Deep
Repair.
This
Project
is
fully
designed
and
ready
to
begin
in
90
days.
One

of
lowest
average
income
ci3es
in
the
county. 












210,000
 44
Auburn WA CDBG West
Valley
Highway
Repair
Truck
Corridor.This
project
is
fully
designed
and
ready
to
begin
in
90
days.
One
of

lowest
average
income
ci3es
in
the
county. 










1,100,000
 53
Auburn WA CDBG "I"
Street
NE
Truck
Corridor
Deep
Repair.
Project
is
fully
designed
and
ready
to
begin
in
90
days.
This
is
a
key

north/south
truck
corridor
in
the
heart
of
the
largest
industrial
and
manufacturing
center
in
the
Pacific

Northwest. 












364,000
 60
Auburn WA CDBG West
Valley
Highway
Truck
Corridor
Deep
Repair.This
project
connects
both
the
Tacoma
and
Seafle
ports

districts
through
the
heart
of
the
largest
industrial
and
manufacuturing
district
in
the
Pacific
Northwest.Project

fully
designed
and
ready
to
begin
in
 












700,000
 84
Auburn WA CDBG Les
Gove
Improvement
Project.
Improves
roads,
sewer,
storm
and
water
systems
in
a
six
block
area.
This

project
is
fully
designed
and
ready
to
start
start
within
90
days.Includes
adding
1.3
miles
of
water
mains,

abandoning
and
replacing
clay
pipes,
adding
 










4,300,000
 95
Auburn WA CDBG Auburn
Community
Center
project
creates
a
large
gathering
space
for
community
educa3on,tourism
and

recrea3on.
Plans
are
complete.
ready
to
bid
and
ready
to
start
in
90
days 








12,000,000
 100
Auburn WA CDBG Auburn
Teen
Center
&
Gym
for
area
youths.
This
is
for
a
community
in
transi3on
with
lower
income
families.

One
method
to
prevent
gangs
from
coming
into
area.Project
on
hold
with
economy.Plans
are
complete.
Ready

to
bid
and
can
start
in
90
days 










5,000,000
 100
Auburn WA CDBG Arterial
Crack
Sealing
Program
that
seals
cracks
on
65
miles
of
arterial
streets
and
70
miles
of
local
streets
in
a

century
old
city
with
one
of
the
lowest
average
incomes
in
county.
This
project
is
fully
designed
and
ready
and

can
start
within
90
days. 










1,900,000
 112
City State Program Project
Descrip3on Funding
Required Jobs
Auburn WA CDBG Harvey
&
8th
St
NE
improvements
for
addi3onal
lanes
for
safety
including
new
sewer.
This
is
a
century
old

industrial
city
and
this
intersec3on
is
vital
to
traffic
connec3ng
the
hillside
with
the
downtown
community.
This

project
is
fully
designed
and
re 










2,225,000
 112
Auburn WA CDBG B
Street
NW
Corridor
Deep
Repair
Truck
Corridor.
This
project
located
in
the
heart
of
the
largest
industrial,

manufacturing,
warehouse
districts
in
the
Pacific
Northwest.
Project
is
fully
designed
and
ready
to
begin
in
90

days. 










2,900,000
 128
Auburn WA CDBG Historic
Post
Office
renova3on
to
neighborhood
center
and
visitor
center.
1920's
post
office
recently
vacated

by
the
county
is
ready
for
redevelopment
next
to
city
owned
an
operated
live
theater
in
the
heart
of
an
historic

downtown
in
one
of
the
lowest
a 










3,000,000
 138
Auburn WA CDBG Jacobson
Community
Park
to
develop
30
acre
park
and
sports
complex.
Area
in
transi3on
with
low
income
city.











7,000,000
 210
Auburn WA CDBG Downtown
Public
Parking
for
private
sector
transit
oriented
development.
City
has
accumulated
six
blocks
of

property
over
six
years
to
encourage
downtown
redevelopment
in
a
century
old
industrial
city
with
one
of
the

lowest
average
incomes
in
the
county. 








30,000,000
 250
Auburn WA CDBG City
Plaza
enhancement
and
Main
Street
four
block
Promemade.
Projects
are
designs
and
reconfigure
the
plaza

at
city
hall
for
more
pedestrian
use
as
well
as
events
with
the
Promenade
going
the
length
of
a
four
block
re‐
development
project
in
the
heart
of
a 








10,000,000
 512
Auburn WA Energy Green
Jobs
replace
all
traffic
signals
with
LED
lamps.
This
city
is
one
of
the
lowest
average
income
ci3es
in
the

county.
This
project
is
ready
and
can
start
within
90
days. 












300,000
 20
Auburn WA Energy Streetlight
replacement
purchase
and
install
2,200
LED
streetlights
throughout
city
to
reduce
ci3zen
costs
by

up
to
50%.
This
project
is
ready
and
can
start
within
90
days. 










3,500,000
 100
Auburn WA Energy Auburn
Environmental
Park
LEED
Silver
Interpre3ve
Center
and
Na3ve
Plants
Greenhouse.
The
City
created
an

environmental
park
from
a
wetland
area
next
to
downtown
and
then
took
the
further
step
of
crea3ng
a
Green

Development
zone
around
it.
Council
is
c 










6,000,000
 192
Auburn WA Public
Safety Two
School
Resource
Officers 












150,000
 2
Auburn WA Public
Safety Fiber
Op3c
connec3on
to
911
system.
Project
ready
to
begin
in
90
days.
One
of
lowest
average
income
ci3es
in

the
county.
This
is
a
century
old
city
afemp3ng
to
update
communica3ons. 












500,000
 21
Auburn WA Public
Safety Fiber
Op3c
Connec3on
to
borders
of
an
adjoining
City
of
Federal
Way 












500,000
 21
Auburn WA Public
Safety Video
surveillance
for
Project
ready
to
begin
in
90
days.
One
of
lowest
average
income
ci3es
in
the
county.City

u3li3es
including
the
water
system
for
a
century
old
city. 












500,000
 21
Auburn WA Public
Safety Fiber
Op3c
connec3on
to
the
hub
of
the
ci3es
of
Auburn,Algona,Pacific.
This
connec3on
includes
the
area

covered
by
the
Auburn
School
District
and
gives
us
the
ability
to
work
to
connect
the
school
sites
within
the

district.Project
ready
to
begin
in
90 










1,200,000
 45
Auburn WA Schools Auburn
High
School
remodel
of
the
1,100
seat
Performing
Arts
Center,
largest
of
its
kind
outside
of
Seafle

center. 












708,940
 35
Auburn WA Schools Underground
fuel
tank
removals
at
schools
in
century
old
city 












464,898
 40
Auburn WA Schools Auburn
Memorial
Stadium
football/soccer
field
field,
ligh3ng,
scoreboard
and
stadium
improvements 










1,558,767
 42
Auburn WA Schools Interior
Ligh3ng
improvements
and
Sensor
ligh3ng
controls 










1,670,707
 48
Auburn WA Streets/Roads ITS
Improvement
to
10
traffic
signal
intersec3ons
to
traffic
management
center.
Project
is
fully
designed
and

ready
to
begin
in
90
days.
One
of
lowest
average
income
ci3es
in
the
county. 










1,100,000
 81
Auburn WA Transit Downtown
Public
Parking
Garage
for
private
sector/public
partnership
Transit
Oriented
Garage.
This
is
located

next
to
a
transit
hub
for
two
coun3es
and
used
by
three
different
bus
agencies,
commuter
rail
and
available
for

AMTRAK.City
owns
to
the
land,
ha 








30,000,000
 300
Auburn WA Water R
St
SE
U3lity
Improvements
storm
drainage,
water
and
sanitary
sewer
infrastructure
and
rebuild
of
the

disturbed
street
pavement
on
an
arterial
of
the
city
that
includes
a
major
park,
mobile
home
park
and
a

connec3on
with
all
communi3es
to
the
east
of
 










4,170,000
 160
Bellevue WA CDBG Mercer
Slough
Environmental
Educa3on
Center
Comple3on
‐
construct
second
classroom
in
a
facility
dedicated

to
study
of
wetland
ecology,
water
quality
and
environmental
sustainability.

Facility
is
a
partnership
between

City,
Pacific
Science
Center
and
P 










3,500,000
 97
Bellevue WA Streets/Roads 123rd
Avenue
SE
Sidewalk
‐
Construct
new
curb,
gufer
and
sidewalk
‐
provides
pedestrian
protec3on
and

neighborhood
access 












600,000
 29
Bellevue WA Streets/Roads 120th
Ave
NE
‐
widen,
add
turn
lanes,
mul3‐modal
improvements
(bike
lanes
and
sidewalks).

Poten3al
to

improve
stormwater
quality
through
natural
drainage
prac3ces.

Connects
downtown
Bellevue
to
Bel‐Red
area
‐

major
redevelopment
plan,
with
es3mates 










3,200,000
 30
Bellevue WA Streets/Roads 148th
Ave
Intersec3on
Safety
and
Reliability
‐
improvements
to
four
signalized
intersec3ons
which
will
increase

safety
and
reliability
on
a
high‐volume
arterial. 










1,000,000
 31
Bellevue WA Streets/Roads 116th
Avenue
SE
Sidewalk
‐
Construct
curb,
gufer
and
sidewalk
‐
provides
safe
walking
route
for
elementary

students
and
pedestrian
protec3on. 












750,000
 37
Bellevue WA Streets/Roads Priority
Arterial
Overlay
‐
comple3on
of
preserva3on
work
and
ADA
retrofits
along
Bellevue
Way.

Would

improve
car
travel
and
non‐motorized
travel
for
residents
along
principle
City
arterial. 










1,000,000
 57
Bellevue WA Streets/Roads West
Lake
Sammamish
Parkway
‐
improvements
to
regional
connector
‐
roadway,
non‐motorized
and
natural

environment.

Will
result
in
safety
and
water
quality
improvements. 










4,200,000
 110
Bellevue WA Streets/Roads NE
2nd
Street
Enhancements
‐
widen
and
incorporate
urban
design
elements
for
pedestrians.

Will
be

coordinated
with
parks
development.

Will
provide
needed
improvements
for
major
growth
expected
in

downtown
Bellevue.

Bike
route,
traffic
flow
and
accident 










2,600,000
 111
Bellevue WA Streets/Roads Northup
Way
Corridor
‐
improvements
to
roadway
to
add
center
turn
lane,
sidewalk,
bike
lane,
traffic
calming

and
pedestrian
crossings. 










3,800,000
 189
Bellevue WA Water Sanitary
Sewer
Trunk
Rehabilita3on
‐
repair
por3ons
of
sewers
where
serious
structural
defects
have
been

found
and
there
is
a
high
likelihood
of
failure.

Would
decrease
risk
to
community
and
environment. 










1,200,000
 19
Bellevue WA Water Asbestos
Cement
Water
Main
Replacement
Project
‐
replace
undersized
and
aging
water
mains
that
represent

a
risk
to
public
safety,
health
and
the
environment. 










1,250,000
 37
Bremerton WA Streets/Roads SAFE
ROUTES
TO
SCHOOLS
‐
Provide
necessary
sidewalks
on
primary
routes
to
elementary
schools. 










1,000,000
 13
Bremerton WA Streets/Roads 11TH
AND
WARREN
AVENUE
IMPROVEMENTS
‐
Reconstruct
intersec3on
with
high
conges3on
and
accident

history. 










2,500,000
 33
Bremerton WA Streets/Roads STREET
PAVING
‐
re‐pave
all
substandard
City
Streets
that
have
failing
pavement. 










4,000,000
 53
Bremerton WA Streets/Roads SHELDON/PACIFIC
AVE
IMPROVEMENTS
‐
Reconstruct
failing
roadway
and
associated
u3li3es
to
support

redevelopment 










8,200,000
 131
City State Program Project
Descrip3on Funding
Required Jobs
Bremerton WA Streets/Roads PARKING
GARAGE
‐
construct
parking
garage
in
the
central
business
district
to
reduce
traffic
conges3on
from

on‐street
parking,
and
leverage
exis3ng
and
planned
re‐development
projects. 










8,000,000
 164
Bremerton WA Water REPLACE
FAILING
SANITARY
SEWER
LATERALS
‐
Install
maintenance
access
piping,
inspect
and
repair
or
replace

failing
sanitary
sewer
laterals.

The
proposed
construc3on
will
reduce
groundwater
inflow
into
the
sanitary

sewer
resul3ng
in
lower
system
opera3 










1,000,000
 20
Bremerton WA Water REPLACE
AND
IMPROVE
CRITICAL
WATER
SYSTEM
INFRASTRUCTURE
‐
replace
exis3ng
substandard
and/or

failing
water
system
infrastructure
to
improve
water
service
and
quality. 










5,000,000
 98
Bremerton WA Water REROUTE
CREEK
AWAY
FROM
LANDFILL
‐
Reroute
Gorst
Creek
(cri3cal
salmon
habitat,
and
an
emergency

drinking
water
source)
away
from
a
failing
landfill
that
contains
toxic
materials
including
commercial
and

medical
wastes.

The
creek
currently
is
conveyed
t 










6,000,000
 118
Bremerton WA Water GORST
SEWERAGE
‐
construct
sewer
collec3on
system
in
an
area
iden3fied
as
a
chronic
environmental
and

public
health
problem
due
to
failing
on‐site
sewage
systems.

The
project
addi3onally
will
implement
Total

Maximum
Daily
Load
thresholds
by
reducing
f 










6,000,000
 502
Bremerton WA Water AIRPORT
SEWER
MAIN
‐
construct
trunk
sanitary
sewer
to
convey
flow
from
South
Kitsap
Industrial
Area
and

Olympic
View
Industrial
Park
to
exis3ng
City
Collec3on
system.

Sewerage
will
open
up
500‐Acres
for
Industrial

Development 








13,000,000
 2168
Brewster WA Streets/Roads Reconstruc3on
and
extension
of
6th
Street 














29,000
 5
Brewster WA Streets/Roads Riverview
Heights
Roadway
Construc3on 














40,000
 5
Brewster WA Streets/Roads Pavement
Preserva3on;
Repair
and/or
overlay
streets 












277,000
 6
Brewster WA Streets/Roads Replacement
of
1000
LF
of
failing
sidewalk 












339,000
 7
Brewster WA Water Water
main
replacement;
Add
new
meters
and
hydrants 














78,000
 5
Bridgeport WA Water 8"
water
main
extension.

9th
Street;
Foster
Avenue
to
Columbia
Avenue 














80,500
 5
Bridgeport WA Water 8"
water
main
extension.

Tacoma
Avenue;
14th
to
16th
Streets 












160,000
 6
Bridgeport WA Water Domes3c
well
including
drilling,
well
house,
pump,
motor,
and
1000
LF
of
12”
water
line 












390,000
 8
Cle
Elum WA Water East
End
Sewer
Extension,
extension
of
sewer
to
approximately
65
acres
of
developable
land
within
the
City

Limits 










1,200,000
 24
Colville WA CDBG Fire
Sta3on
‐
Replace
exis3ng,
outdated
Fire
Sta3on 










2,500,000
 6
Colville WA CDBG Colville
Public
Library
Addi3on
and
Redesign
will
expand
and
update
the
exis3ng
city
library
with
green

construc3on
thus
improving
collec3on
capacity
and
technology
capabili3es,
as
well
as
providing
coummunity

space
for
mee3ngs,
educ3on,
educa3on 








10,000,000
 200
Colville WA Streets/Roads 3rd
Ave
Reconstruc3on
‐
Reconstruct
street
to
extend
SR20
to
truck
route 










1,400,000
 10
Colville WA Streets/Roads Pavement
Preserva3on
‐
Repair
and
reconstruct
all
deteriorated
streets 










8,000,000
 12
Colville WA Streets/Roads Hawthorne
Reconstruc3on
‐
Reconstruct
deteriorated
street.
Pavement,
curbs,
water
&
Sewer 










4,900,000
 15
Colville WA Streets/Roads Evergreen
Way
New
Construc3on
‐
Construct
new
street
to
connect
SR20
to
SW
city
limits 










3,800,000
 18
Colville WA Water Sewer
Replacement
‐
Replace
deteriorated
and
leaking
sewer
lines 










5,000,000
 15
Colville WA Water Waterline
Replacement
&
New
Reservoir
Construc3on
‐
Replace
deteriorated
waterlines
and
construc3on
new

1
mill
gal
reservoir 










9,900,000
 15
Colville WA Water Water
and
sewer
upgrades.

Replace
approximately
6500
lineal
feet
of
60
year
old
water
and
sewer
lines.


Overlay
roadways
on
comple3on











2,450,000
 49
Creston WA Streets/Roads Sidewalk
Safety
Replacement;

School
zone,
storm
drainage,
and
ADA
Compliance













200,000
 5
Creston WA Water Water
Main
Replacement;

4000
LF
of
pipe
throughout
town.

Replacement
is
a
high
priority
for
fire

suppression
by
the
Washington
State
Dept
of
Health













840,000
 17
Edmonds WA Streets/Roads Downtown
Street
Ligh3ng
and
Sidewalk
Replacement.

Install
street
ligh3ng
and
new
sidewalks
to

improvement
safety. 












300,000
 2.9
Edmonds WA Streets/Roads Annual
Asphalt
Overlay
Maintenance
Contract.
This
project
is
the
annual
overlay
maintenance
contract
for
City
streets.

The
project
budget
is
based
on
a

20year
life
cycle. 










1,700,000
 6
Edmonds WA Streets/Roads 75th/76th
Walkway
&
162nd
Street
Park
Project.

Construct
a
walkway
on
76th
Avenue
West/75th
Place
West

between
Meadowdale
Beach
Road
and
Meadowvale
County
Park
the
south
side. 










2,800,000
 15.1
Edmonds WA Streets/Roads Caspers/Ninth
Avenue/Puget
Drive
Walkway.

Construct
a
walkway
on
the
north
side
of
Caspers
Street

between
3rd
Avenue
North
&
9th
Avenue
North
on
the
west
side
of
9th
Avenue
North
between
Caspers
Street

and
Puget
Drive
&
the
north
side
of
Puget
Drive
from 










1,000,000
 16.9
Edmonds WA Water Olympic
View
Drive
w/Lynnwood,
Phase
II.

Install
new
8"
duc3le
iron
pipe
water
main,
fire
hydrants
and

associated
appurtenances
in
areas
along
Olympic
View
Drive,
in
conjunc3on
with
street
improvements
to
be

constructed
on
Olympic
View
Drive
by
the
Cit 












275,000
 3.4
Edmonds WA Water BNSF
U3lity
Work.

BNSF
is
requiring
the
City
to
protect
its
sewer,
water
and
storm
crossings
within
the
BNSF

right
of
way
to
accommodate
the
installa3on
of
a
second
track. 












530,000
 6.1
Edmonds WA Water 93rd/96th
Drainage
Improvements.

Install
new
storm
collec3on
system
to
serve
the
major
low
areas
and

connected
to
Edmonds
Way
trunk
storm
drain. 












525,000
 9.1
Everef WA CDBG Lions
Park
Renova3on 










1,000,000
 75
Everef WA Housing CHIP
Program 












250,000
 10
Everef WA Housing Habitat
for
Humanity
Housing 












300,000
 12
Everef WA Housing ARTSPACE
Housing 










5,000,000
 100
Everef WA Public
Safety Fiber
Op3c
Network 










1,390,000
 40
Everef WA Schools Artspace
Educa3on
Center 










2,000,000
 75
Everef WA Streets/Roads ITS/Signal
Improvements 








13,000,000
 25
Everef WA Streets/Roads Pavement
Overlay 










3,000,000
 30
Everef WA Water Bond
Street
Combine
Sewer
Overflow 








25,000,000
 60
Fife WA CDBG Swim
Center:
replacement
of
25‐year‐old
air
handler,
condensing
unit,
and
domes3c
water
heater,
including

installa3on
of
roof
scufle. 












250,000
 5
Fife WA Streets/Roads 70th
Avenue
East,
20th
Street
East
to
North
City
Limits
‐
pavement
preserva3on,
including
grind,
overlay,
and

u3lity
adjustments
to
1,200
feet
of
2‐lane
arterial 












180,000
 8
Fife WA Streets/Roads Pacific
Highway
East
(Old
99)
Alexander
Avenue
to
Willow
Road
‐
Pavement
preserva3on
including
grind,

overlay,
and
u3lity
adjustments
for
2,000
feet
of
5‐lane
arterial 












300,000
 13
City State Program Project
Descrip3on Funding
Required Jobs
Fife WA Streets/Roads Pacific
Highway
East
(Old
99)
Port
of
Tacoma
Road
to
West
City
Limits
‐
Pavement
preserva3on,
including
grind,

overlay
and
u3lity
adjustments
for
3,200
feet
of
5‐lane
arterial 












550,000
 22
Fife WA Streets/Roads 54th
Avenue
East,
Pacific
Avenue
East
to
North
City
Limits
‐
Pavement
preserva3on,
including
grind,
overlay,

and
u3lity
adjustments
for
5,000
feet
of
5‐lane
arterial 












820,000
 32
Fife WA Streets/Roads 70th
and
Valley
Corridor,
including
widening
5,000
feet
of
Valley
Avenue
from
2
to
4
lanes
and
1,000
feet
of

70th
Avenue
from
2/3
to
5/6
lanes 










3,600,000
 260
Fife WA Streets/Roads 70th
and
Valley
Corridor:
70th
Avenue
grade
separa3on,
a
4‐lane
bridge
over
the
Union
Pacific
Railroad 








25,000,000
 500
Fife WA Water 12‐inch
main
replacement
‐
500
feet
of
new
duc3le
iron
pipe
to
replace
corroded
cast
iron
pipe
in
casing
under

I‐5,
just
west
of
54th
Avenue
East 












160,000
 6
Fife WA Water Sewer
pump
sta3on
upgrades,
including
15
pumps,
an
odor
control
system,
and
two
generator
sets,
at
a
total

of
8
pump
sta3ons 












214,000
 8
Fife WA Water Inter3e
at
Puyallup
service
territory
boundary,
including
3,000
feet
of
12‐inch
water
main
and
pump
sta3on 












980,000
 20
Kefle
Falls WA Energy Kefle
Falls
Public
Library
Addi3on
and
Redesign;
Expand
and
update
with
green
construc3on
improving

collec3on
capacity,
technology
capabili3es,
providing
community
space
for
mee3ngs,
educa3on,
and
business

development.
 










1,100,000
 22
Kefle
Falls WA Streets/Roads East
10th
Ave
Reconstruc3on 












150,000
 6
Kefle
Falls WA Streets/Roads Meyers
Street
Resurfacing 












160,000
 6
Kefle
Falls WA Streets/Roads US
395
Northside
Pedestrian
Improvements;

Sidewalk,
defined
access
points,
and
storm
drainage













600,000
 12
Kefle
Falls WA Streets/Roads Pavement
Preserva3on:
various
streets 












678,000
 14
Kefle
Falls WA Water Wastewater
Treatment
Facility,
Replace
exisi3ng
failing
lagoon
system
with
a
Treatment
Facility









10,000,000
 200
Kirkland WA CDBG 116th
Ave
NE
Rural
Low
Impact
Development
project 












800,000
 30
Kirkland WA CDBG Stream
enhancements/fish
crossing
of
Yarrow
Creek
at
116th
Ave
NE 












750,000
 30
Kirkland WA CDBG Juanita
Beach
Park
improvements 












500,000
 50
Kirkland WA CDBG Urban
Pedestrian
Corridor
‐
Low
Impact
Development 










1,000,000
 50
Kirkland WA Streets/Roads 116th
Ave
NE
Bike
and
Pedestrian
Facil3es 










4,000,000
 50
Kirkland WA Streets/Roads 116th
Ave
NE
Non‐Motorized
facili3es 












900,000
 50
Kirkland WA Streets/Roads 124th
Ave
NE
Roadway
Expansion 










4,000,000
 200
Kirkland WA Streets/Roads NE
120th
Street
Extension 










3,000,000
 1200
Kirkland WA Transit Downtown
Transit
Center/Park
Lane
Pedestrian
Corridor
project 












700,000
 50
Kirkland WA Water Third
Street
Water
Main
replacement 












120,000
 40
Kirkland WA Water North
Reservoir
Seismic
Upgrades 










1,400,000
 50
Lakewood WA CDBG Street
ligh3ng 














25,000
 0.5
Lakewood WA CDBG Affordable
housing
&
physical
improvements 














70,000
 1
Lakewood WA CDBG Site
planning
&
improvements
at
Ward's
Lake
Park 














50,000
 1
Lakewood WA CDBG Emergency
minor
home
repair 












190,000
 3
Lakewood WA CDBG Major
home
repairs 












150,000
 3
Lakewood WA CDBG Energy
Conserva3on
Tillicum
Neighborhood 












250,000
 5
Lakewood WA CDBG North
American
Lake
Park
boat
launch
(uplands
area) 












450,000
 8
Lakewood WA CDBG Develop
two
neighborhood/school
parks 












600,000
 11
Lakewood WA CDBG Harry
Todd
Park
Americans
with
Disabili3es
Act
upgrades 










1,000,000
 18
Lakewood WA CDBG Americans
with
Disabili3es
improvements
&
fishing
pier
at
American
Lake
Park
(north) 










1,300,000
 22
Lakewood WA CDBG Repair/remodel
historic
Fort
Steilacoom
Park
barns 










1,700,000
 30
Lakewood WA Public
Safety Crash
Data
Retrieval
(CDR)
System 















6,000
 0
Lakewood WA Public
Safety 360
degree
crime
scene
scanner 












100,000
 1
Lakewood WA Public
Safety Fire
suppression
training
captain 












130,000
 1
Lakewood WA Public
Safety One
addi3onal
code
enforcement
officer 












111,605
 1
Lakewood WA Public
Safety Communica3ons
offcier 












240,000
 2
Lakewood WA Public
Safety Radio
technician 












220,000
 2
Lakewood WA Public
Safety Smartlink
radio
communica3on
system 










6,784,428
 3
Lakewood WA Public
Safety Funds
to
perform
abatements
&
remove
blighted
buildings 












400,000
 8
Lakewood WA Public
Safety Police
department
gun
range 












663,500
 11
Lakewood WA Public
Safety Regional
fire
training
tower
w/apparatus
bay 










4,691,153
 83
Lakewood WA Public
Safety Regional
combined
communica3ons
center 








14,450,272
 260
Lakewood WA Schools District‐wide
facili3es
master
planning 












158,750
 13
Lakewood WA Schools Military
schools
planning
&
design 










1,604,200
 41
Lakewood WA Schools Hor3cultural
small
capital
projects 








13,875,000
 70
Lakewood WA Schools Demolish
A/I
school 










5,000,000
 100
Lakewood WA Schools Specialized
facili3es
project
studies 










1,154,500
 120
Lakewood WA Schools Electrical
small
capital
projects 










3,750,000
 148
Lakewood WA Schools Mechanical
small
capital
projects 








11,900,000
 200
Lakewood WA Schools Upgrade
Lochburn
Middle
School 








20,000,000
 200
Lakewood WA Schools Lakes
High
School
reconstruc3on 








22,313,000
 332
Lakewood WA Schools Structural
small
capital
projects 








13,790,000
 447
Lakewood WA Schools Upgrade
Hudtloff
Middle
School 








65,000,000
 800
Lakewood WA Schools Construct
new
elementary/middle
school
to
replace
Oakbrook
&
Southgate 








75,000,000
 1000
Lakewood WA Streets/Roads Steilacoom
Boulevard
SW
sidewalk
project 












525,000
 9
Lakewood WA Streets/Roads Resurface
Waughop
Lake
Road
at
Fort
Steilacoom
Park 










1,000,000
 18
Lakewood WA Streets/Roads 100th
Street
SW
improvements
(Gravelly
Lake
Drive
SW
to
59th
Avenue
SW) 










2,000,000
 36
Lakewood WA Streets/Roads Update
the
City's
an3quated
traffic
signal
controllers 










2,250,000
 39
Lakewood WA Streets/Roads Pacific
Highway
SW
street
improvements
‐
phase
4 










3,500,000
 63
City State Program Project
Descrip3on Funding
Required Jobs
Lakewood WA Streets/Roads Bridgeport
Way
SW
street
improvement
projects 










5,700,000
 100
Lakewood WA Streets/Roads Pavement
rehabilita3on
&
street
overlay
projects
‐
various
loca3ons 










5,400,000
 100
Lakewood WA Transit Commuter
pedestrian
bridge
at
the
Lakewood
Sta3on 










5,000,000
 90
Lakewood WA Transit D
&
M
Street
railroad
bridge 






150,000,000
 2700
Lakewood WA Water Tillicum
Neighborhood
side
sewer
connec3ons 












250,000
 4
Lakewood WA Water Fort
Steilacoom
Park
sewers 










1,000,000
 18
Lakewood WA Water Public
works
maintenance
yard 










1,000,000
 18
Lakewood WA Water Tillicum
neighborhood
water
main
installa3on 










1,000,000
 18
Lakewood WA Water Increasing
water
pressure
zone
on
east
side
of
City 










1,300,000
 23
Lakewood WA Water Springbrook
Neighborhood
water
main
bore
project 










1,500,000
 27
Lakewood WA Water American
Lake
Gardens/Tillicum
sanitary
sewers 










9,000,000
 162
Leavenworth WA Water South
Wastewater
Interceptor
Replacement;
18"
‐
2200
LF











1,200,000
 24
Longview WA Streets/Roads City
Street
Rehabilitaion
Program:
Repair
of
seriously
compromised
city
streets. 










3,000,000
 40
Longview WA Streets/Roads Columbia
Hieghts
Repavemant:
Heavily
u3lized
road
including
school
bus
route
with
no
sidewalks,
drainage
or

crosswalks. 










3,000,000
 40
Longview WA Streets/Roads Weber
Ave
Extension:
Opening
Phase
II
of
Industrial
Park. 










2,000,000
 240
Marcus WA CDBG Heritage
Gateway
and
Town
Hall
Improvements 












700,000
 14
Mafawa WA Streets/Roads Selkirk
Avenue
Overlay 












220,797
 4
Mafawa WA Streets/Roads South
Boundary
Overlay 












220,797
 4
Mafawa WA Streets/Roads North
Portage
Avenue
overlay 












151,234
 6
Mafawa WA Streets/Roads Fourth
Street
overlay 












182,660
 7
Mafawa WA Streets/Roads Government
Road
water
distribu3on
improvements 












200,000
 8
Mafawa WA Streets/Roads South
Riverview
Avenue
overlay 












203,250
 8
Mafawa WA Streets/Roads South
William
Avenue
overlay 












234,107
 9
Mafawa WA Streets/Roads Saddle
Mountain
Drive
overlay 












243,633
 10
Mafawa WA Streets/Roads First
Street
overlay 












363,756
 15
Mafawa WA Streets/Roads Reconstruc3on
of
Government
Road 










2,218,670
 44
Moses
Lake WA Streets/Roads Downtown
Streets
Safety
Impreovements:

Widen
streets,
sidewalks,
and
improve
pedestrian
routes











2,500,000
 50
Moses
Lake WA Streets/Roads Reconstruc3on
of
Lakeside
Drive
and
Peninsula
Road;
includes
water,
sewer,
storm
drainage,
and
ac3vity
trail.











3,000,000
 60
Moses
Lake WA Water Mae
Valley
Sewer
Extension:

New
service
area,
increase
urban
density,
and
remove
exis3ng
sep3c
systems











1,000,000
 20
Moses
Lake WA Water Cascade
Valley
Water
and
Sewer
extension;
New
service
area,
new
residentail
development,
eliminate
private

wells
and
sep3c
systems 










2,000,000
 40
Northport WA CDBG Northport
Community
Center
Building
Project
will
construct
a
mul3‐purpose
community
space
that
will
house

ten
public
computers
with
high‐speed
internet
connec3ons,
library
services,
a
distance
educa3on
center,

employment
center,
business
incubator,
and 












500,000
 10
Okanogan WA Water Rodeo
Trail
Road
U3li3es;
Add
domes3c
water,
fire
suppression,
and
sewer 










2,600,000
 52
Okanogan WA Water Elmway
Water
&
Sewer
Extension 










3,055,496
 61
Pacific WA CDBG Pacific
Skateboard
Project.
This
project
willl
create
a
unique
skateboard
park
for
"ci3zens"
in
Pacific
and
3

surounding
Low
Income
communi3es.
The
City
proposes
to
construct
improvements
in
2009,
all
plans
and

specs
are
substan3ally
complete. 












600,000
 17
Pacific WA CDBG West
Valley
Highway
Repair.
This
project
entails
deep
patch
work,
pedestrian
improvements
and
overlay
for

City's
por3on
of
this
major
trucking
route
from
Seafle
to
Tacoma. 










3,000,000
 25
Pacific WA CDBG Pacific
Street
Repairs.
This
project
will
entail
deep
pavement
restora3on
to
the
City
of
Pacific's
7.1
center
lane

miles
of
arterial
roads.
Addi3onally,
the
City
will
perform
pavement
overlays
to
its
local
street
network
that
is

rated
as
41
on
a
Pavemen 










3,500,000
 35
Pacific WA CDBG Stewart
Road
Widening.
This
project
will
widen
the
exis3ng
2‐lane
roadway
to
a
con3nuous
4‐lane
roadway

with
a
two‐way
leb
turn
lane.

Improvements
include
a
new
signal
at
Thornton
Avenue,
upgrade
of
the
exis3ng

signal
at
Valen3ne
Road,
signal
interc 










5,000,000
 85
Pacific WA Water Pacific
Wastewater
Pump
Sta3on
Repairs.
The
City
provides
water
water
collec3on
services
that
has
4
pumping

sta3ons
that
are
failing.
The
project
will
seal
all
pump
sta3ons,
provide
new
pumps
and
electrical
equipment.













450,000
 22
Pacific WA Water Pacific
Water
System
Repairs.
The
City
provides
potable
water
for
6225
ci3zens
and
350
businesses.
This

project
will
replace
a
significant
por3on
of
the
City's
southern
water
system,
plans
and
specifica3ons
are
in

place
to
bid
this
work
in
April
2009. 










1,000,000
 25
Redmond WA Streets/Roads 2.

East
Lake
Sammamish
Parkway
Rehabilita3on
Project:

The
roadway
concrete
panels
have
deterioated
and

sefled
from
many
years
of
heavy
use
crea3ng
an
uneven
driving
surface
decreasing
safety
and
increasing

maintenance.

The
pavement
has
exceeded
its 










1,000,000
 10
Redmond WA Streets/Roads 3.

2009
Redmond
Street
Rehabilita3on
project:

Repair
and
provide
a
new
asphalt
pavement
surface
on
four

miles
of
City
of
Redmond
streets.

Redmond's
Pavement
Management
Program
has
priori3zed
the
pavement

condi3on
of
all
of
Redmond's
streets
and
iden 










1,800,000
 10
Redmond WA Streets/Roads 4.
Cleveland
St.
Improvement
Project:

The
roadway
improvements
include
traffic
calming
elements
such
as

curb
extensions,
wider
sidewalks,
urban
and
pedestrian
ameni3es,
new
storm
drainage
system,
new
signals

and
roadway
illumina3on. 








13,000,000
 87
Redmond WA Streets/Roads 1.

NE
36th
St.
Bridge:

Construc3on
of
a
bridge
over
SR
520,
including
one
through
lane
in
each
direc3on,
turn

lanes,
bike
lanes,
sidewalks
and
intersec3on
improvements
on
each
end.

The
bridge
reduces
the
distance
to

cross
SR
520
from
two
miles
to
.2 








14,500,000
 198
Renton WA CDBG Downtown
Renton
Wayfinding
Ini3a3ve
‐
This
project
will
construct
and
install
a
system
of
signage,
gateways,

and
kiosks
to
highlight
des3na3ons
and
guide
visitors
into
and
around
Downtown
Renton.

The
system

enhances
the
revitaliza3on
efforts
of
Rent 












775,000
 14
Renton WA CDBG Barrier
Free
Sidewalk
Project
‐
The
project
will
construct
several
sidewalks
that
support
the
City’s
effort
to

improve
pedestrian
facili3es
that
are
within
the
local
street
network
into
conformity
with
provisions
contained

in
the
federal
Americans
with
D 










1,000,000
 35
Renton WA CDBG Street
Overlay
and
Rehabilita3on
Project
‐
This
project
will
provide
asphalt
concrete
resurfacing
of
city
streets

and
rehabilita3on
of
arterials
that
are
cri3cal
to
movement
of
freight
within
and
through
the
City. 










5,000,000
 175
City State Program Project
Descrip3on Funding
Required Jobs
Renton WA CDBG Facili3es
and
Parks
Maintenance
&
Opera3ons
Center
‐
This
project
would:
Replace
old
and
temporary
facili3es

which
support
the
City’s
Parks
and
Facili3es
Maintenance
staff
and
opera3ons;
Improve
staff
working

condi3ons
and
opera3onal
efficiencies; 








12,000,000
 420
Renton WA Streets/Roads SW
27th
Street/Strander
Boulevard
Connec3on
Project
‐
City
of
Renton
City
of
Tukwila
‐
The
SR‐167
HOV/SW
27th
Street/Strander
Boulevard
Connec3on
project
will
provide
an

alternate
route
to
Interstate
405
between
I‐5
and
SR‐167.

This
project
will
incre 










4,200,000
 147
Renton WA Transit Rainier
Avenue
(SR
167)
Improvements
Project
–
Shafuck
Avenue
Stormwater
Bypass
‐
City
of
Renton,
Sound

Transit,
BNSF
‐
The
Rainier
Avenue
Improvements
project
includes
adding
Business
Access
and
Transit
(BAT)

lanes,
reconstruc3ng
three
railroad
bridges 










2,000,000
 70
Renton WA Water Earlington
Water
and
Sewer
Replacement
Project
‐
Replacement
of
approximately
8,000
feet
of
aging,
leaky

and
undersized
water
mains
to
provide
adequate
capacity
for
fire
protec3on
and
to
improve
drinking
water

quality.

Also
includes
some
upgrades
of
sew 










3,700,000
 129
Riverside WA CDBG New
City
Hall/Shop;

1900's
era
building's
are
in
dire
need
of
replacement











1,300,000
 26
Seafle WA Amtrak Railroad
Crossing
Signal
Improvements
‐
Improve
key
railroad
crossings
in
the
Seafle
Waterfront
Quiet
Zone
to

improve
safety
along
rail
corridor
that
serves
Amtrak,
Sound
Transit
and
freight
trains. 










1,500,000
 50
Seafle WA Amtrak King
Street
Sta3on
Renova3on
–
renova3on
of

historic
train
sta3on
that
serves
Sound
Transit
commuter
trains

and
Amtrak
intercity
rail
into
a
modern,
mul3‐modal
transporta3on
hub 










4,000,000
 230
Seafle WA CDBG Goodwill
Development
Associa3on,
Teen
Home
Fire
Sprinkler
System 














85,000

Seafle WA CDBG Neighborcare
Health
SE
Seafle
Dental
Clinic, 










2,000,000

Seafle WA CDBG Seafle
Chinatown
Interna3onal
District
Preserva3on
and
Development
Authority,
Nutri3on
Program
Space

Rehabilita3on 












316,000

Seafle WA CDBG United
Indians
of
All
Tribes
Founda3on,
Teen
Parent
Home
Major
Rehabilita3on 










1,750,000

Seafle WA CDBG Repair
sewer
line
from
sidewalk
to
main
lateral
line
in
street
at
the
Central
Area
Senior
Center. 














80,000
 0.5
Seafle WA CDBG Replace
the
an3quated
heat
pumps
with
new,
more
efficient
heat
pumps
in
the
Greenwood
Senior
Center. 












100,000
 0.75
Seafle WA CDBG Upgrade
the
electrical
panels,
branch
circuits,
and
grounding
system
in
the
Greenwood
Senior
Center. 












160,000
 1.25
Seafle WA CDBG Replace
original
aluminum
single‐pane
with
new
double‐pane
windows
at
the
Central
Area
Senior
Center. 












300,000
 2.25
Seafle WA CDBG Re‐zone
the
Hea3ng,
Ven3la3ng,
and
Air
Condi3oning
system
at
the
Southeast
Heath
Community
Center
to

provide
even
distribu3on
of
HVAC. 












400,000
 3
Seafle WA CDBG Replace
aging
roof
at
Southeast
Health
Clinic. 












850,000
 6.8
Seafle WA Energy Retrofit
lights
at
various
Seafle
parks 












225,000
 2
Seafle WA Energy Solar
Hot
Water
at
major
ins3tu3ons 












161,000
 2.5
Seafle WA Energy Seafle
Parks
condensing
boiler
installa3on 












400,000
 3
Seafle WA Energy Upgrade
ligh3ng
in
various
departments 












630,000
 4.25
Seafle WA Energy Energy
efficiency
and
small
scale
renewable
projects
at
Cedar
Falls
Hydro
opera3ons. 










1,000,000
 5
Seafle WA Energy Solar
Power
on
Seafle
City
Hall 












600,000
 7
Seafle WA Energy Community
Solar
project‐

100kw
solar
photovoltaic
system
located
in
central/eastern
Washington. 










1,200,000
 8
Seafle WA Energy Magnuson
Park
Renewable
Energy
Demonstra3on‐

Install
up
to
25kw
of
renewable
energy
on
three
comfort

sta3ons
and
rest
rooms. 










1,200,000
 8
Seafle WA Energy Re‐balance/re‐engineer
the
Variable
Air
Volume
(VAV)
system
in
Airport
Way
Center
Building
Buildings. 










1,140,000
 8.25
Seafle WA Energy Woodland
Park
Zoo
HVAC
&
Ligh3ng
EE
Upgrades 










1,250,000
 9
Seafle WA Energy Install
photovoltaic
arrays
on
the
roof
of
Seafle
Department
of
Transporta3on's
Sign
Shop. 










1,715,525
 13.75
Seafle WA Energy Ligh3ng
retrofit
project
for
Seafle
Municipal
Tower. 










3,500,000
 15
Seafle WA Energy Replace
the
an3quated
Hea3ng,
Ven3la3ng,
and
Air
Condi3oning
system
and
expand
Siemens
Controls
at
the

Charles
Street
Vehicle
Maintenance
Building. 










2,100,000
 16.75
Seafle WA Energy Energy
efficiency
and
small
scale
renewable
projects
at
Skagit
Hydro
Opera3ons. 










3,000,000
 22
Seafle WA Energy Various
small
scale
energy
efficiency
projects
at
city
owned
facili3es 










3,420,000
 25.75
Seafle WA Energy Central
Plant
EE
Upgrades
at
Major
Ins3tu3ons 








12,300,000
 89
Seafle WA Energy Various

HVAC
EE
Upgrades
at
publicly‐owned
buildings 








17,500,000
 130
Seafle WA Housing Bell
Tower
Rehabilita3on‐Major
system
rehabilita3on
including
water
lines,
ven3la3on
system,
windows,

exterior
coa3ng,
UFAS
upgrades 










4,000,000

Seafle WA Housing High
Point
HOPE
VI‐Construc3on
of
parks 










1,000,000

Seafle WA Housing Ranier
Vista
HOPE
VI‐Construc3on
of
51
LIPH
units 










1,500,000

Seafle WA Public
Safety Provision
of
Hand‐held
3cke3ng
devices
to
Traffic
Enforcement
Police
Officers. 












412,540

Seafle WA Public
Safety Hiring
of
Eleven
new
Police
Officers
in
2009. 












863,709
 11
Seafle WA Streets/Roads Greenwood
Ave
N
‐
Widens
the
roadway
from
four‐lanes
to
five‐lanes
with
parallel
parking,
curb,
gufer,
and

sidewalks
on
both
sides
from
N
105th
to
N
112th.

Improves
transit
speed
and
reliability
and
increases
safety

for
all
modes. 












600,000
 30
Seafle WA Streets/Roads NE
Northgate
Way
–
Intersec3on
improvements
that
reduce
travel
3mes,
improve
freight
movement
and

increase
access
to
major
commercial,
health
care
and
higher
educa3on
employers
in
the
area. 










1,000,000
 270
Seafle WA Streets/Roads Aurora
Avenue
N

from
137th
to
145th
St
–
widens
Aurora
Avenue,
a
key
commercial
corridor,
to
support

economic
growth,
improve
safety
and
mobility,
and

enhance
pedestrian
facili3es.
Includes
transit
lane. 










4,000,000
 280
Seafle WA Streets/Roads E
Marginal
Way
Grade
Separa3on
‐
provides
a
roadway/rail
grade
separa3on
allowing
freight
traffic
and
other

vehicles
to
pass
over
rail
lines
which
befer
connects
port
terminals,
rail
yards,
warehousing
and

manufacturers. 








16,000,000
 560
Seafle WA Streets/Roads Mercer
Corridor
East
‐
Widens
Mercer
Street
between
I‐5
and
Dexter
Ave
North
to
accommodate
three
lanes

of
travel
in
each
direc3on,
parking,
sidewalks
and
a
median
with
leb‐turn
lanes.
Provides
a
more
direct
route,

improves
access
to
jobs
in
the
surroun 








50,000,000
 2240
Seafle WA Streets/Roads Spokane
Street
Viaduct
–
Widens
the
viaduct
and
builds
a
two‐lane
loop
off‐ramp
to
improve
freight
mobility

and
provide
a
grade‐separated
route
connec3ng
I‐5,
SR
99,
SR
519
and
I‐90
with
container
terminals.
Extends

exis3ng
bus‐only
lane. 








25,000,000
 2240
Seafle WA Water Replace
galvanized
domes3c
water
pipe
at
Fire
Sta3on
#18. 














40,000
 0.25
Seafle WA Water Repair
the
sewer
main
under
the
Ballard/Northwest
Senior
Center. 














60,000
 0.5
Seafle WA Water Repair
the
main
side
sewer
at
Fire
Sta3on
#40 












200,000
 1.5
Seafle WA Water Re‐pipe
hot
and
cold
domes3c
water
lines
at
the
Charles
Street
Engineering
Building. 












200,000
 1.5
City State Program Project
Descrip3on Funding
Required Jobs
Seafle WA Water Replace
galvanized
piping
at
Fire
Sta3on
#34 












200,000
 1.5
Seafle WA Water Upgrade
fire
sta3on
drainage
systems
to
divert
fire
apparatus
washwater
from
storm
sewer
system. 












200,000
 1.6
Seafle WA Water NE
107th
and
17th
Culvert
Replacement
–
Replace
culvert
within
Thornton
Creek
damaged
by
2007
storms. 












700,000
 12
Seafle WA Water Point
Sewer
Pipe
Rehabilita3on
–
Rehabilita3on
of
sewer
pipe
at
localized
loca3ons
within
the
wastewater

system
based. 










1,740,000
 15
Seafle WA Water Georgetown
Flume
Drainage
Improvement
‐
Construc3on
of
new
drainage
conveyance
system
to
replace

exis3ng 










1,380,000
 24
Seafle WA Water Construc3on
of
Generator
Sta3on
and
Buried
Feeder
line
for
emergency
pumping
at
main
water
source
for

city. 










6,270,000
 26
Seafle WA Water Norfolk
Basin
Water
Quality
Project
–
Reduce
pollutant
loading
to
Duwamish
River 










2,510,000
 36
Seafle WA Water Madison
Valley
Long
Term
Solu3on
–
Construc3on
of
stormwater
deten3on
system
to
eliminate
surface

flooding
and
sewer
system
backups. 








43,000,000
 50
Snoqualmie WA Streets/Roads Meadowbrook
bridges
‐
Replace
two
old
small
wooden
bridges
on
one
of
the
enterances
to
town. 










1,500,000
 45
Snoqualmie WA Streets/Roads Railroad
Crossing
Improvements
at
Stone
Quarry
Road,
Meadowbrook
Way
SE,
Norhtern
Street
(two
tracks),

King
street
(two
tracks) 












300,000
 50
Snoqualmie WA Streets/Roads Re‐construct
Meadowbrook
Avenue
‐
Completely
reconstruct
from
sub‐grade
to
surface. 










4,000,000
 100
Snoqualmie WA Streets/Roads Tokul
Road
Roundabout.

To
make
a
very
dangerous
intersec3on
on
State
Route
202
safer
and
more
fuel

efficent. 










5,800,000
 110
Snoqualmie WA Water 599
Reservoir
Madifica3ons
‐
Reservoir
needs
to
be
upgraded
since
it
is
a
cri3cal
part
of
the
exis3g
system 












400,000
 20
Snoqualmie WA Water Johnson
Heights
Water
System
‐
A
substandard
water
system
aquired
by
the
City
years
ago
that
needs

considerable
upgrading
to
comply
with
now
day
requirements,
fire
flow
etc. 












500,000
 25
Snoqualmie WA Water Hospital
Booster
Sta3on
and
PRV
‐
upgrades
along
with
a
PRV
are
needed
to
adequately
serve
the
city 












900,000
 30
Snoqualmie WA Water Winery
Booster
Sta3on
Sta3on
PRV,
Beta
Street
water
main
improvements,
Railroad
Place
water
main

improvements,
Newton
Street
water
main
improvements 












600,000
 30
Snoqualmie WA Water Sewer
Lib
sta3ons
no.
3
and
4
‐
To
elevate
each
to
avoid
flooding
during
high
water. 










2,000,000
 45
Spokane WA Streets/Roads Ben
Burr
Trail
from
Liberty
Park
to
Erie/Riverside
Dr 












350,000
 15
Spokane WA Streets/Roads Historic
Iron
Bridge;
rehab
old
RR
bridge
for
ped
and
bike
access 












580,000
 15
Spokane WA Streets/Roads 5‐Mile
Prairie
from
Ash
to
Lincoln‐Bike
and
pedestrian
improvments; 










1,000,000
 20
Spokane WA Streets/Roads 5th
Ave
from
Washington
to
Monroe 










1,100,000
 20
Spokane WA Streets/Roads Bike
routes
downtown‐Jefferson,
4th
Ave,
Howard,
Spokane
Falls
Blvd,
Riverside,
Main 












719,000
 20
Spokane WA Streets/Roads Fish
Lake
Trail;
construct
approx
4.4
miles
of
trail 










1,000,000
 20
Spokane WA Streets/Roads Buckeye
from
Post
St
to
Division
St;
full
reconstruc3on 










1,200,000
 30
Spokane WA Streets/Roads Garland
from
NW
Blvd
to
Driscoll;
full
reconstruc3on 










1,200,000
 30
Spokane WA Streets/Roads Rowan
from
Maple
St
to
Wall
St;
full
reconstruc3on 










1,000,000
 30
Spokane WA Streets/Roads Wellesley
fro
Assembly
to
Driscoll;
full
reconstruc3on 










1,300,000
 30
Spokane WA Streets/Roads Mission
from
Hamilton
to
Napa
(includes
signal
replacement
at
Hamilton);
full
reconstruc3on 










1,800,000
 40
Spokane WA Streets/Roads Barnes
Rd
from
Phoebe
to
Strong
Road.
new
roadway
construc3on 










2,200,000
 60
Spokane WA Streets/Roads Crestline
from
37th
to
53rd;
full
reconstruc3on
of
the
roadway
including
new
curb
and
sidewalk 










2,500,000
 60
Spokane WA Streets/Roads Perry
St
from
SE
Blvd
to
Arthur
and
Arthur
from
Perry
to
3rd;
full
reconstruc3on 










2,700,000
 60
Spokane WA Streets/Roads Freya
St
Bridge;
Rehabilia3on
project 








12,000,000
 100
Spokane WA Streets/Roads Havana
St
Bridge;
new
grade
separa3on 








18,500,000
 100
Spokane WA Streets/Roads Lincoln/Monroe
from
the
River
to
17th
Ave;
full
reconstruc3on 










5,200,000
 100
Spokane WA Streets/Roads Maple/Walnut‐Cedar‐High
Drive
from
5th
to
29th;
full
reconstruc3on 










5,500,000
 100
Spokane WA Water Barnes
Rd
Water
Main 










1,026,000
 20
Spokane WA Water Fairchild
AFB
Transmission
Main
Phase
2 










5,876,000
 75
Sumner WA Streets/Roads Stewart
Road
Located
in
the
ci3es
of
Sumner
and
Pacific
is
a
two‐lane,
22‐foot‐wide
arterial
roadway
connec3ng
West
Valley

Highway
East
and
State
Route
167
(SR167)
to
East
Valley
Highway
East
and
the
newly
completed
Lake
Tapps

Parkway
East.
The
roadway 










6,580,000
 45
Tacoma WA CDBG 4
Tacoma
Police
Substa3ons
mechanical
system
rehabilita3on. 












120,000
 2
Tacoma WA CDBG Tacoma
Police
Fleet
Warehouse
Improvements. 












310,000
 5
Tacoma WA CDBG Tacoma
Police
Special
Teams
Warehouse
Improvements. 












460,000
 7
Tacoma WA CDBG Tacoma
Police
Department
Sub
Sta3on
Sector
4
Rehabilita3on. 












575,000
 9
Tacoma WA CDBG The
proposed
project
would
upgrade
the
elevators
in
the
Tacoma
Municipal
Building
including
both
sobware

and
hardware
components. 












650,000
 10
Tacoma WA CDBG New
computer
aided
dispatch
system
for
LESA. 










4,000,000
 15
Tacoma WA CDBG The
proposed
project
would
refurbish
the
exterior
of
the
Tacoma
Municpal
Building
which
is
listed
on
the

Na3onal
Historic
Register
and
was
built
in
the
1920's. 










1,500,000
 25
Tacoma WA CDBG Tacoma
Police
Range
and
structure
improvements. 










1,960,000
 31
Tacoma WA CDBG Murray
Morgan
Bridge

The
Murray
Morgan
Bridge
is
currently
closed
to
vehicular
traffic
due
to
its
severe
state
of
disrepair.
While
the

bridge
is
currently
open
to
pedestrian
traffic,
the
Washington
State
Department
of
Transporta3on
has

determined
that 










3,000,000
 48
Tacoma WA CDBG Structural
Sidewalks
The
City
of
Tacoma
currently
has
a
number
of
structural
sidewalks
that
are
unsafe
as
determined
by
the
City’s

structural
engineer.
These
structural
sidewalk’s
poten3al
for
collapse
pose
a
hazard
to
pedestrians
as
well
as

the
occupan 










3,000,000
 48
Tacoma WA CDBG The
proposed
project
would
reroof
the
Municipal
Complex
which
includes
Tacoma
Municipal
Building,
Tacoma

Municipal
Building
North,
and
the
Municipal
Garage.
The
roofing
system
has
exceeded
its
usefull
life
and
is

need
of
replacement 










3,625,000
 50
Tacoma WA CDBG Construct
new
Real
Time
Crime
Center
for
LESA. 










5,325,000
 85
Tacoma WA CDBG Construct
new
3‐1‐1
Customer
Assistance
Call
Center
for
LESA 










9,700,000
 154
City State Program Project
Descrip3on Funding
Required Jobs
Tacoma WA CDBG Americans
with
Disabili3es
Act
Curb
Ramp
Program
In
2007
a
survey
of
sidewalks
and
intersec3ons
was
completed
by
the
City
of
Tacoma.
The
survey
found
that

17,754
curb
ramps
needed
to
be
constructed
to
fully
comply
with
the
Americans
with
Disabili3es
A 








15,000,000
 239
Tacoma WA CDBG Tacoma
Dome
facili3es
upgrades
and
renova3ons.

Examples
include
sea3ng
replacement,
security
system,
and

Exhibi3on
Hall
upgrades. 








17,750,000
 283
Tacoma WA CDBG Arterial
Street
Program
The
arterial
street
program
currently
has
12
projects
that
are
par3ally
funded
through
grants
and
other
means.

These
projects
cannot
be
put
out
to
bid
un3l
they
are
fully
funded.
A
total
of
$13.2
million
in
grants
were

allocated 








18,100,000
 289
Tacoma WA CDBG Tacoma
Police
Headquarters‐
3
Story
Parking
garage
entering
off
Fife
street
(120
new
stalls).
Headquarters
Public
Building
addi3on
with
sky
bridge
to
exis3ng
HQ.









19,500,000
 311
Tacoma WA CDBG Puyallup
River
Bridge
This
dilapidated
structure,
is
an
important
east‐west
connec3on
between
the
Port
of
Tacoma
and
the
City
of

Tacoma
as
well
as
the
City
of
Fife,
has
serious
structural
issues
and
may
soon
have
load
limits
imposed
on
it. 








25,000,000
 398
Tacoma WA CDBG Law
Enforcement
Support
Agency
(LESA)
is
a
mul3
jurisdic3onal
agency.

New
LESA
9‐1‐1
Communica3ons

Center. 






117,000,000
 1866
Tacoma WA Energy The
proposed
project
would
install
new
HVAC
systems
in
both
the
Beacon
and
Lighthouse
Senior
Centers

replacing
the
exis3ng
steam
boiler
heat
and
replacing
them
with
more
efficient
heat
pumps
in
order
to
provide

both
heat
and
cooling. 












700,000
 15
Tacoma WA Energy The
proposed
project
would
remove
and
replace
the
exis3ng
ligh3ng
system
in
the
Tacoma
Municpal
Complex

in
order
to
make
the
complex
operate
more
efficiently. 










1,000,000
 20
Tacoma WA Energy The
proposed
project
would
upgrade
the
exis3ng
HVAC
system
in
the
Tacoma
Municpal
Building
which
has

exceeded
its
useful
life
expectancy.
The
project
would
provide
a
much
higher
efficiency
along
with
befer

climate
control
and
tenant
comfort. 










1,850,000
 25
Tacoma WA Energy Digester
Gas
Energy
Recovery.




This
project
willcollect
digester
gas
from
thhe
wastewater
treatment
plant
and
use
to
produce
heat
and
energy.

This
will
provide
an
alterna3ve
energy
source
fo
rthe
plant
saving
money
while
reducing
greenhouse
gases.











7,000,000
 49
Tacoma WA Water Jefferson
Street
Surface
Water
Main
Replacement.
This
project
generally
consist
of
open‐cut
replacement
of
approximately
3,
000
linear
feet
of
exis3ng
surface

water
mains
that
were
constructed
in
the
early
1900's
and
are
structurally
deteriorated. 










1,000,000
 16
Tacoma WA Water Jefferson
Street
Wastewater
Main
and
Replacement.
This
project
generally
consist
of
open‐cut
replacement
of
approximately
3,
000
linear
feet
of
exis3ng

wastewater
mains
that
were
constructed
in
the
early
1900's
and
are
structurally
deteriorated. 










1,000,000
 16
Tacoma WA Water PS4103
Force
Main
Replacement.

Replacement
of
the
Pump
Sta3on
4103
Force
Main
under
the
Hylebos

Waterway
by
direc3onal
Drilling.

This
project
will
also
provide
upgrades
at
Pump
Sta3ons
4102
and
4103,

including
provisions
for
third
pumps
at
each
sta3 










1,900,000
 30
Tacoma WA Water Wastewater
Collec3on
System
Rehabilita3on.
Rehabilitate
(CIPP
lining)
and
spot
repairs
of
approximately
50,000
linear
feet
of
aging
wastewater
collec3on

system
pipes. 










2,000,000
 32
Tacoma WA Water Wastewater
Collec3on
System
Rehabilita3on
Associated
with
Street
Paving
Projects. 










3,000,000
 48
Tacoma WA Water Surface
Water
Collec3on
System
Rehabilita3on
Associated
with
Street
Paving
Projects.

This
project
generally

consist
of
open‐cut
replacement
or
extension
of
approximately
8,
400
linear
feet
of
surface
water
mains
in

conjunc3on
with
street
paving
projec 










5,400,000
 86
Tacoma WA Water CTP
Dissolved
Air
Flota3on
Thickeners
Upgrade.


This
project
will
upgrade
and
add
addi3onal
supply
lines
and

controls
to
the
Dissolved
Air
Flota3on
Thickeners
(DAFT's)
tanks
used
in
the
Central
Treatment
Plant
secondary

treatment
process
to
remove
liq 










5,500,000
 88
Tacoma WA Water CTP
Energy
Management.

This
project
will
implement
the
recommenda3ons
from
Central
Treatment
Plant

Energy
Management
Study
prepared
by
MWH
for
the
CTP
Upgrade
Project 










7,000,000
 112
Tonasket WA CDBG Downtown
Improvement
Project 










6,371,250
 50
Vancouver WA Streets/Roads 136TH
and
MILL
PLAIN
INTERCHANGE


This
intersec3on
upgrade
project
has
been
designed
to
alleviate
conges3on
along
the
City’
primary
east/west

corridor
serving
east
Vancouver.

This
corridor
is
at
capacity,
due
primarily
to
the
failure
of
the
intersec 










4,000,000
 70
Vancouver WA Streets/Roads MAIN
STREET
PROJECT

In
its
full
scope,
the
Main
Street
retail
revitaliza3on
is
much
more
than
a
transporta3on
project.

Along
with

rebuilding
the
city’s
historic
thoroughfare,
the
project
is
being
designed
in
the
context
of
a
retail
strategy
that

3e 








10,800,000
 166
Vancouver WA Streets/Roads RIVERWEST
PARKING
STRUCTURE

The
Riverwest
development
is
an
urban,
mixed
use
public
private
partnership
to
redevelop
approximately
3.75

acre
site
in
Downtown
Vancouver.

The
redevelopment
program
includes

•
Over
500,000
square
feet
of
mixed‐use
deve 








15,000,000
 274


Vancouver WA Streets/Roads DOWNTOWN
VANCOUVER
WATERFRONT
ACCESS
PROJECT

The
waterfront
access
project
is
an
es3mated
$38.5
million
capital
project
that
includes
street,
rail
and
u3lity

work
which
will
provide
access
to
the
downtown
waterfront
redevelopment
area.

The
access
 








38,500,000
 614


Vancouver WA Water ELLSWORTH
to
WATER
STATION
#9,
PHASE
II

The
majority
of
City
water
supplies
are
in
the
southwest
por3on
of
the
water
service
area
and
major
new

residen3al
and
industrial
developments
occur
in
the
northeast
por3on
of
the
water
service
area.

The
2007 










2,700,000
 12
City State Program Project
Descrip3on Funding
Required Jobs
Vancouver WA Water SEWER
CAPITAL
IMPROVEMENT
PROJECTS

NE
11th
Street

$


140,000
Riverview
Heights
$1,013,000
Fellman’s
1
&
2
$1,586,000

The
above
projects
are
part
of
a
program
that
provides
public
sanitary
sewer
to
areas
of
the
city
that
were












2,739,000
 50
developed
without
pu
Vancouver WA Water NEIGHBORHOOD
SANITARY
SEWER
PROGRAM

Eliminate
failing
sep3c
systems
Protect
human
health
Protect
Sole
Source
Drinking
Water
Aquifer
Protects
home
values










10,000,000
 95
The
number
of

jobs
created
by
the
Neighborhood
Sanitary
Sewer
Program
Project
would
be
appr
Wenatchee
 WA Schools Wenatchee
High
School
Irriga3on
Main
Replacement,
Replace
failing
irriga3on
main 












100,000
 4
Wenatchee
 WA Schools Wenatchee
High
School
Life
Safety
Alarm
System
Upgrade,
upgrade
obsolete
fire
alarm
system 












250,000
 5
Wenatchee
 WA Schools Wenatchee
High
School
Tennis
Court
Replacement,
Replace
exis3ng
Tennis
Courts.

Current
courts
are
cracked

and
poses
trip
hazards,
etc.

Facility
is
u3lized
by
all
schools
in
the
district
as
well
as
the
general
public 












300,000
 6
Wenatchee
 WA Schools Wenatchee
High
School
Ligh3ng
upgrade,

Replace
obsolete
(1972)
ligh3ng
system
with
new
energy
efficient

ligh3ng
system 












350,000
 7
Wenatchee
 WA Schools Apple
Bowl
Stadium
Grandstand
Replacement,

Replace
deteriorated
stadium
grandstands 












400,000
 8
Wenatchee
 WA Schools Pioneer
Middle
School
Moderniza3on,
Improve
inadequate
locker
rooms
and
provided
ADA
access.

Replace

Gymnasium
ligh3ng
system 










3,000,000
 60
Wilbur WA Water Wilbur
Wastewater
Treatment
Plant:
replacement
of
old
lagoons
with
Plant











5,600,000
 112
Winthrop WA CDBG Town
shop 












300,000
 12
Winthrop WA Streets/Roads Resurfacing
Projects 












178,000
 7
Winthrop WA Streets/Roads Downtown
Street
Light
Improvements













200,000
 8
Winthrop WA Streets/Roads Castle
Gap
Improvement
Design 












955,000
 20
Yakima WA Airport Yakima
Air
Terminal
Fire
Sta3on
Remodel 












600,000
 50
Yakima WA Airport East
Runway
Safety
Area
‐
16th
Ave
Realignment 










3,000,000
 60
Yakima WA CDBG Capitol
Theatre
Pavilion
and
Plaza 










4,000,000

Yakima WA CDBG Miller
Park
Ac3vity
Center
Expansion
and
Remodel 










2,500,000
 50
Yakima WA CDBG Southeast
Community
Center
Rehabilita3on 










2,500,000
 50
Yakima WA CDBG Yakima
308
Irriga3on
System
Rebuild 










5,000,000
 50
Yakima WA CDBG Renewal
Communit
Neighborhood
Sewer
Main
Installa3on 










5,000,000
 120
Yakima WA Public
Safety Integrated
Public
Safety
System 










3,000,000
 50
Yakima WA Streets/Roads Arterial
Grind
and
Overlay 










5,000,000
 50
Yakima WA Streets/Roads Fruitvale
Canal
Piping
and
Pathway 










2,400,000
 50
Yakima WA Streets/Roads West
Nob
Hill
Blvd
Expansion 










4,600,000
 50
Yakima WA Streets/Roads Yakima
Downtown
Futures
Ini3a3ve 










6,400,000
 60
Yakima WA Streets/Roads East
Nob
Hill
Bridge
Rehabilita3on 










4,000,000
 100
Yakima WA Streets/Roads Lincoln
Ave/MLK
Blvd.
Railroad
Grade
Separa3on
Project 










8,000,000
 320
Yakima WA Transit Yakima
Valley
Trolley
System
Restora3on 










5,000,000
 50
Yakima WA Water Sewer
Main
Installa3on 










5,000,000
 50
Yarrow
Point WA CDBG 92nd
Avenue
NE
‐
Full
Street
2"
Overlay
(SR
520
to
NE
47th
Street) 












550,000
 20
Yarrow
Point WA CDBG NE
34th
Street
‐
Full
Street
2"
Overlay
(92nd
Avenue
NE
West) 












150,000
 20
Yarrow
Point WA CDBG NE
41st
Street
‐
Full
Street
2"
Overlay
(92nd
Avenue
NE
West) 












150,000
 20
Yarrow
Point WA CDBG Public
Sports
Court 












100,000
 20
Yarrow
Point WA CDBG Stormwater
Capital
Improvement
Project
#2
‐
94th
Ave.
NE:
Based
on
Jan.
2008
Comprehensive
SW

Management
Plan
Recommenda3ons;
Upsize
815LF
of
exis3ng
stormwater
infrastructure; 












200,000
 25
Yarrow
Point WA CDBG Stormwater
Capital
Improvement
Project
#3
‐
NE
47th
Street:

Based
on
Jan.
2008
Comprehensive
SW

Management
Plan
Recommenda3ons;
Upsize
~600LF
of
exis3ng
SW
infrastructure 












300,000
 25
Yarrow
Point WA CDBG Stormwater
Capital
Improvement
Project
#1
‐
NE
42nd
Street/92nd
Avenue
NE:
Based
on
Jan.
2008

Comprehensive
SW
Management
Plan
Recommenda3ons;
Upsize
3,900LF
of
exis3ng
stormwater

infrastructure;
overflows
poten3ally
threaten
an
exis3ng
sanitary
sewer 










1,300,000
 50
Yarrow
Point WA Water Local
Fountain
Improvements
‐
Bid
Package
ready 












150,000
 15
Beloit WI Energy Alterna3ve
Fuel
Vehicles 












100,000

Beloit WI Energy 2010:
Energy
Conserva3on 












100,000
 2
Beloit WI Energy Energy
Conserva3on,
library
green
roof
and
City
Hall
Solar 












100,000
 2
Beloit WI Housing Public
Housing
Upgrades 












398,000
 22
Beloit WI Public
Safety 2010:
Shotspofer
‐
gunshot
loca3on
and
detec3on
system 












200,000
 0
Beloit WI Public
Safety City
Hall
Security
System
/
Audio‐Video 














75,000
 0
Beloit WI Public
Safety Mobile
Data
Radio
Modem
‐
GPS
Upgrade 














87,500
 0
Beloit WI Public
Safety Shotspofer
‐
gunshot
loca3on
and
detec3on
system 














40,000
 0
Beloit WI Public
Safety 2010:
Traffic
Preemp3on,
Install
a
traffic
preemp3on
system
in
all
fire
department
emergency
response

vehicles. 












100,000
 1
Beloit WI Public
Safety Two
Drug
and
Gang
Unit
Officers,
Salary
and
Benefits 












174,880
 2
Beloit WI Public
Safety Wireless
Network
Expansion 












158,825
 5
Beloit WI Streets/Roads 2009:
Rail
Crossing
Improvements
on
Henry
Ave.
and
Milwaukee
Road 












125,000
 5
Beloit WI Streets/Roads 2010:

Townhall
Road
Culvert
Replacement 












181,000
 9
City State Program Project
Descrip3on Funding
Required Jobs
Beloit WI Streets/Roads 2009:
Cranston
Road
to
Milwaukee
Road
Intersec3on
Improvements 












250,000
 10
Beloit WI Streets/Roads 2010:
Fourth
Street
Parking
Lot
Reconstruc3on 












200,000
 10
Beloit WI Streets/Roads 2010:
Cranston
Road
Pavement
Repairs:

Prairie
Ave
‐West
City
Limits 












300,000
 13
Beloit WI Streets/Roads 2009:
Concrete
Street
Repairs 












350,000
 15
Beloit WI Streets/Roads 2010:

Public
Ave.;

Pleasant
‐
College.
Public
Ave.
New
curb
and
gufer,
pavement,
lead
service
replacement,

water
main
and
sanitary
sewer
repair
as
needed,
and
decora3ve
street
ligh3ng
are
included
for
this
project. 












395,000
 20
Beloit WI Streets/Roads 2009:
Park
Avenue
Street
Ligh3ng 












507,000
 25
Beloit WI Streets/Roads 2009:
Harvey
Street
Reconstruc3on
from
Wisconsin
to
Yates 












595,000
 30
Beloit WI Streets/Roads 2009:
Sager
Lane
Railspur 












635,750
 30
Beloit WI Streets/Roads 2010:
Morse
Avenue
Reconstruc3on 












677,000
 35
Beloit WI Streets/Roads 2010:
East
Side
Neighborhood
Ini3a3ve
Streets
‐
Central
from
Chapin
to
Emmerson
and
Chapin
from
Central
to

the
dead
end,
Construct
2010. 












705,000
 37
Beloit WI Streets/Roads 2010:
West
Side
Neighborhood
Ini3a3ve
Street,
This
project
will
reconstruct
Merrill
St
from
Vine
to
Fourth
and

Sixth
St
from
Portland
Ave
to
Merrill. 












750,000
 38
Beloit WI Streets/Roads 2009:
Millington
Road
Reconstruc3on 












800,000
 45
Beloit WI Streets/Roads 2010:
Annual
Street
Maintenance 












625,000
 45
Beloit WI Streets/Roads 2009:
Annual
Street
Maintenance 












800,000
 50
Beloit WI Streets/Roads 2009:
Re‐Allignment
of
Mill
Street 










1,000,000
 50
Beloit WI Streets/Roads 2009:
ABC
Parkway
Extension 












987,000
 55
Beloit WI Streets/Roads 2009:
Extend
Gateway
Boulevard
from
Eagles
Ridge
Drive
to
Hart
Road 










3,875,572
 200
Beloit WI Transit 2009:
Purchase
of
two
hybrid
transit
buses 










1,000,000
 0
Beloit WI Transit 2010:
Replace
3
1997
Phantom
buses. 












263,538
 0
Beloit WI Transit 2010:
Shop
Equipment:
Purchase
of
regularly
required
and
periodic
major
bus
maintenance
parts
and

replacement
of
maintenance
equipment. 















2,000
 0
Beloit WI Transit 2010:
Transit
System
regular
replacement
cycle
of
exis3ng
copier,
fax
machine,
and
computer
equipment. 















1,620
 0
Beloit WI Transit 2009:
Transit
Transfer
Site
Building 












543,543
 30
Beloit WI Water 2009:
Replace
Influent
Screeing
Press 












112,000
 0
Beloit WI Water 2009:
Wastewater
Pollu3on
Control
Facility
Security
System 












100,000
 0
Beloit WI Water 2009:
WPCF
Standby
Power 












580,000
 0
Beloit WI Water 2010:
Replace
Influent
Screenings
Press 












112,000
 0
Beloit WI Water 2009:
Replace
TC
Hydrants 












115,000
 1
Beloit WI Water 2010:
Replace
TC
Hydrants 












118,000
 1
Beloit WI Water 2009:
Aera3on
Basin
Tank
Upgrade 














30,000
 2
Beloit WI Water 2009:
Aera3on
Blower
Upgrades 














45,000
 2
Beloit WI Water 2009:
Clarifier
Upgrades 














45,000
 2
Beloit WI Water 2009:
Storm
Sewer
Improvements 














50,000
 2
Beloit WI Water 2009:
Well
Pumping
Equipment 














82,000
 2
Beloit WI Water 2010:

Clarifier
Upgrades 














45,000
 2
Beloit WI Water 2010:

Well
Pumping
Equipment. 














84,000
 2
Beloit WI Water 2010:
Aera3on
Basin
Tank
Upgrade 














30,000
 2
Beloit WI Water 2010:
Storm
Sewer
Improvements 














50,000
 2
Beloit WI Water 2009:
Interceptor
Access
Roads 














50,000
 3
Beloit WI Water 2010:
Interceptor
Access
Roads 














50,000
 3
Beloit WI Water 2010:
Well
#4
Rebuild 














95,000
 3
Beloit WI Water 2009:
Recoat
Mill
Water
Tower 












350,000
 4
Beloit WI Water 2009:
Stormwater
Seflement
Ponds 










1,428,000
 5
Beloit WI Water 2009:
Water
Main
Replacement
Program 












700,000
 5
Beloit WI Water 2010:
Water
Main
Replacement
Program 












721,000
 5
Beloit WI Water 2009:
Northwest
Interceptor
Grou3ng 












525,000
 6
Beloit WI Water 2009:
Mi3gate
Well
#11
Nitrate 










1,980,000
 10
Beloit WI Water 2009:
Sanitary
Sewer
Repair 












355,000
 10
Beloit WI Water 2010:
Sanitary
Sewer
Repair 












365,000
 10
Beloit WI Water 2009:
Biosolids
Dewatering
&
Odor
Control 










5,700,000
 15
Beloit WI Water 2009:
Gateway
Blvd.
Sewer
and
Water
Extension 










3,430,000
 85
Cedarburg WI CDBG Library
building
project
on
contaminated
site,
remedia3on
plan
currently
being
reviewed
by
the
EPA
for
clean

up
to
begin
spring
2009
followed
by
construc3on
of
new
27,000
sq
b
library
building 








10,000,000
 50
Cedarburg WI CDBG Remedia3on
and
development
of
business
site
where
owner
is
bankrupt
and
funding
is
not
available.


Neighboring
proper3es
also
contaminated
due
to
business. 










5,000,000
 50
Cedarburg WI Streets/Roads Interurban
Trail
asphalt
overlay,
south
end
of
trail
(Center
St.
to
south
of
Pioneer
Rd.)
 














25,000
 3
Cedarburg WI Streets/Roads Doerr
Way 












110,000
 5
Cedarburg WI Streets/Roads Grant
Avenue 












145,000
 5
Cedarburg WI Streets/Roads Street
Improvement
projects:

Riveredge
Drive 












220,000
 15
Cedarburg WI Streets/Roads Cedar
Creek
Walkway 










1,500,000
 20
Cedarburg WI Water St.
John
Ave.
from
Cleveland
St.
to
Center
St.
 














30,000
 5
Cedarburg WI Water Storm
water
improvement
projects:
Doerr
Way
storm
sewer 












120,000
 5
Green
Bay WI CDBG Downtown
Mall
Site
Demoli3on
and
Infrastructure
Development











2,800,000
 20
Green
Bay WI CDBG Children's
Museum
of
Green
Bay











3,500,000
 25
Green
Bay WI CDBG Neighborhood
Block
Redevelopment/Enhancement 










5,000,000
 30
City State Program Project
Descrip3on Funding
Required Jobs
Green
Bay WI CDBG Construc3on
of
Federal
Courthouse











2,500,000
 50
Green
Bay WI CDBG CityDeck
Phase
II
Urban
Parkway
Construc3on 










3,500,000
 60
Green
Bay WI CDBG Build
out
Agrilink
Site











9,000,000
 100
Green
Bay WI CDBG Webster
Avenue
Reconstruc3on
from
Radisson
to
East
River 










5,800,000
 120
Green
Bay WI CDBG Brown
County
Central
Library
Restora3on









10,000,000
 150
Green
Bay WI CDBG Expand
KI
Center
Conven3on
Space









10,000,000
 150
Green
Bay WI CDBG Parking
Ramp
Construc3on









10,000,000
 150
Green
Bay WI Energy EECBG
Coordinator 














75,000
 3
Green
Bay WI Energy EECBG
Green
building
incen3ves 












225,000
 28
Green
Bay WI Energy City
Hall
Energy
Efficiency
Upgrades 












311,000
 35
Green
Bay WI Housing Safety
Repairs
at
Mason
Manor
public
housing
for
seniors 












100,000
 5
Green
Bay WI Public
Safety Forensic/Disaster
Recovery
Truck 












240,000

Green
Bay WI Public
Safety Police
Department
Public
Safety
Ini3a3ves 








10,000,000

Green
Bay WI Public
Safety Regional
Training
Facility 














90,000
 1
Green
Bay WI Public
Safety Police
Evidence
Drying
Room 














40,000
 5
Green
Bay WI Public
Safety Community
Service
Interns
Program
expansion 












180,000
 12
Green
Bay WI Streets/Roads Pavement
Resurfacing
and
Repairs













650,000
 12
Green
Bay WI Streets/Roads Lombardi
Avenue
Enhancement











1,000,000
 20
Green
Bay WI Streets/Roads Mason
Street:
Erie
to
Grandview











1,600,000
 30
Green
Bay WI Streets/Roads Recrea3onal
Trail
Connec3on











3,800,000
 50
Green
Bay WI Streets/Roads Military
Avenue
Reconstruc3on
from
Langlade
to
Dousman









13,000,000
 100
Green
Bay WI Transit Purchase
8
new
buses 












200,000
 6
Green
Bay WI Water The
Woods
Stormwater
Deten3on
Pond













400,000
 20
Green
Bay WI Water Baird
Creek
Sanitary
Sewer
Interceptor











1,400,000
 50
Green
Bay WI Water Green
Bay
Developed
Areas
Stormwater
Management
Retrofits:
Phase
II











2,700,000
 100
Janesville WI CDBG Residen3al
Housing
Rehabilita3on
Program
Expansion 












100,000
 1
Janesville WI CDBG Service
Ac3vi3es
Targetd
to
Low
and
Moderate
Income
Individuals 














50,000
 1
Janesville WI CDBG Target
Area
Slum
and
Blight
Elimina3on
Program 












100,000
 1
Janesville WI CDBG Lead
Hazard
Control
Program 












300,000
 3
Janesville WI CDBG Downtown
Parking
Structure 










3,000,000
 30
Janesville WI CDBG Neighborhood
Stabiliza3on
Program 










3,000,000
 30
Janesville WI Energy Residen3al
Housing
Rehabilita3on
Program
Energy
Efficiency
Grants 












100,000
 1
Janesville WI Energy Municipal
Building
Server
Room
Reloca3on 












250,000
 3
Janesville WI Energy Landfill
Phase
Closure
Including
Gas
Capture
System 












700,000
 7
Janesville WI Energy Ice
Arena
Renova3on
and
Energy
Efficiency
Upgrades 










1,000,000
 10
Janesville WI Energy Landfill
Phase
Construc3on
Including
Leachate
Pumping
System
Upgrades 










1,170,000
 12
Janesville WI Energy Landfill
Scale
and
Scalehouse
Replacement/Renova3on 












150,000
 15
Janesville WI Streets/Roads Sandhill
Dr.
Infrastructure
Extension 












130,000
 1
Janesville WI Streets/Roads Willow
Glade
Development 












139,000
 1
Janesville WI Streets/Roads Fulton
Ave.
Infrastructure
Extension 












269,600
 3
Janesville WI Streets/Roads Venture
Dr.
and
Progress
Dr.
Infrastructure
Extension 












296,500
 3
Janesville WI Streets/Roads Curb
and
Gufer
Replacement
and
Reconstruc3on 












420,000
 4
Janesville WI Streets/Roads Southside
Bike
Trail
Construc3on 












425,000
 4
Janesville WI Streets/Roads Springbrook
Bike
Trail
Extension 












360,000
 4
Janesville WI Streets/Roads New
and
Replacement
Sidewalk
Construc3on 












510,000
 5
Janesville WI Streets/Roads Northeast
Side
Bike
Trail
Extension 












450,000
 5
Janesville WI Streets/Roads E.
Milwaukee
St.
Bike
Trail
Tunnel 












590,000
 6
Janesville WI Streets/Roads Street
Maintenance,
Resurfacing,
&
Repair
Program 












650,000
 7
Janesville WI Streets/Roads Ruger
Ave.
(Springbrook)
Bridge
Replacement 












802,000
 8
Janesville WI Streets/Roads Westside
Bike
Trail
Extension 










1,000,000
 10
Janesville WI Streets/Roads Aus3n
Rd.
Improvements 










1,050,000
 11
Janesville WI Streets/Roads Wright
Rd.
Infrastructure
Improvements
and
Sewer
&
Water
Extension 










1,130,000
 11
Janesville WI Streets/Roads McCormick
Dr.
Infrastructure
Extension 










1,436,000
 14
Janesville WI Streets/Roads Ruger
Ave.
Improvements 










2,200,000
 22
Janesville WI Streets/Roads Milwuakee
St.
Bridge
Replacement 










5,500,000
 55
Janesville WI Streets/Roads Jackson
St.
Bridge
Replacement 










6,356,000
 64
Janesville WI Transit Transit
Maintenance
Building
Construc3on 










6,250,000
 63
Janesville WI Water Undersized
Water
Main
Replacement 












300,000
 3
Janesville WI Water Water
Main
Replacement
Program 












350,000
 4
Janesville WI Water Lead
Water
Services
Replacement 












540,000
 5
City State Program Project
Descrip3on Funding
Required Jobs
Janesville WI Water Black
Bridge
Rd.
Water
Main
Reloca3on 










1,300,000
 13
Janesville WI Water Wastewater
Treatment
Plant
Expansion 








32,000,000
 320
Madison WI CDBG Complete
Phase
II
of
Briqngham
Park
project;
restrooms,
office,
user
ac3vi3es













400,000
 2
Madison WI CDBG Elver
Park
‐‐
Open
shelter
w/
electrical
and
water
at
sports
fields
for
picnics;
build
on‐site
Maintenance
bldg.

for
athle3c
fields,
etc.













150,000
 2
Madison WI CDBG Restrooms
at
Lake
Edge
Park
and
Burrows
Park













500,000
 2
Madison WI CDBG Summit
Maintenance
Facility
‐‐Phase
II
/
Freeport
Rd.
bldg.
expand
to
accommodate
West
Forestry
and
expand

West
Maintenance 












500,000
 3
Madison WI CDBG Olin
‐
Turville
Park
‐‐
Build
shelter
/
overlook
at
John
Nolen
Dr













600,000
 4
Madison WI CDBG Property
Assessment
Program
for
property
assessment
and
taxa3on
func3ons 












900,000
 5
Madison WI CDBG Various
area
parks
‐‐
Open
air
shelter
w/
electrical
and
water
at
17
Area
Parks
built
since
1985













800,000
 5
Madison WI CDBG Elizabeth
Link
Peace
Park
‐‐
Re‐build
en3re
site
as
per
plan 










1,000,000
 7
Madison WI CDBG Vilas
Park‐‐
Re‐build
exis3ng
shelter;
re‐build
path
&
roads;
beach
to
Orchard
St











1,200,000
 8
Madison WI CDBG Forest
Hill
Cemetery
‐‐
Replace
manual
irriga3on
system;
incorporate
water
conserva3on;
repave
exis3ng

roadway
system;
mill
and
re‐surface 










1,300,000
 9
Madison WI CDBG Tenney
Park
‐‐
Re‐build
Roadway
and
Parking;
Complete
Shelter
re‐construc3on
Project;
Replace
exis3ng

pedestrian
bridge
to
Shelter











2,000,000
 13
Madison WI CDBG Door
Creek
Park
‐‐
Grading
&
seeding;
build
shelter;
complete
roadway,
parking
and
Bike
Path
Paving;
complete

Lighted
Tennis
Complex 










2,800,000
 19
Madison WI CDBG Warner
Park
‐
refurbish
stadium;
re‐build
exis3ng
parking
lot
/
roadways
and
ligh3ng











2,800,000
 19
Madison WI CDBG Breese
Stevens
Field‐‐
Complete
Phase
II;
concession,
restrooms,
shop,
etc;
replace
grass
w/
"Field
turf" 










3,000,000
 20
Madison WI CDBG Reindahl
Park
‐‐
4
lighted
sobball
w/
concesssion,
complete
Phase
II
of
parking
lots
and
roadways;
irrigate

sports
fields;
support
maintenance
bldgs 










3,000,000
 20
Madison WI CDBG Yahara
Parkway
boathouse











3,000,000
 21
Madison WI CDBG Build
a
Central
Park
on
Madison's
ithsmus 








15,000,000
 84
Madison WI CDBG Garver
Feed
Mill
Arts
Incubator









15,400,000
 87
Madison WI CDBG Public
pools
at
Warner
Park
and
Reindahl
 








14,000,000
 98
Madison WI CDBG Madison
Public
Market 








18,000,000
 101
Madison WI CDBG Downtown
Public
Library 








40,000,000
 225
Madison WI Energy Small
Business
Window
and
Door
Energy
Efficiency
Program 












500,000
 3
Madison WI Energy Update
HVAC
systems
at
City
of
Madison
facili3es 












280,000
 5
Madison WI Energy Expand
exis3ng
MadiSun
program
to
provide
grants
to
businesses
to
install
solar
electric
and
solar
hot
water

systems 










1,000,000
 6
Madison WI Energy Solar
PV
at
City
of
Madison
facili3es
to
generate
electricity











1,100,000
 6
Madison WI Energy Placing
concrete
bunkers
for
Yard
Waste
Site
at
Streets
‐
East















75,000
 10
Madison WI Energy Remodel
Streets
maintenance
facility
at
Sycamore 












596,800
 25
Madison WI Energy BioAg
Gateway
Commercializa3on
and
Business
Incuba3on
Facility
‐‐
This
30,000
SF
green‐powered
facility
will

provide
state
of
the
art
bio‐secure
controlled
environments
for
plant
manufacturing,
business
incuba3on

space,
prototyping,
and
micro
processin 








10,000,000
 95
Madison WI Energy Energy
efficiency
revolving
loan
program
for
City
of
Madison
homeowners 










1,000,000
 300
Madison WI Public
Safety Police
Department
facility/building
improvements 












493,000
 3
Madison WI Public
Safety Police
Department
records
management
system 












470,000
 3
Madison WI Public
Safety Emergency
Warning
Siren
System
‐‐
replacement
of
post‐World
War
II
system 












625,000
 4
Madison WI Public
Safety County
Wide,
Inter‐Operable
Radio
Communica3on
System
‐‐
endorsed
by
FCC









38,000,000
 214
Madison WI Streets/Roads Construct
mezzanine
storage
at
Streets
East
maintenance
shop















83,000
 5
Madison WI Streets/Roads Construct
Tradewinds
Parkway
easterly
to
intersect
with
Agricultural
Drive













950,000
 5
Madison WI Streets/Roads South
Street
Extension
to
Park
Street
‐‐
provide
the
Dean
Clinic
with
access
to
Park
Street
and
Enhance
Medical

Access













991,000
 6
Madison WI Streets/Roads Parking
Lot
Resurfacing
at
Badger
Rd
Streets
maintenance
shop













368,000
 10
Madison WI Streets/Roads Reconstruct
Femrite
Drive
from
Marsh
Road
to
one
mile
east
of
Interstate
39/90.











2,370,000
 13
Madison WI Streets/Roads Reconstruc3on
of
Lien
Road
Intersec3on
to
Thompson
Drive
and
Zieir
Road











2,840,000
 16
Madison WI Streets/Roads Badger
Vehicle
Storage
Annex
‐‐
tear
down
and
rebuild
exis3ng
vehicle
storage
annex











1,200,000
 20
Madison WI Streets/Roads University
Ave
pavement
replacement
‐‐
Farley
to
Segoe
Rd
(replace
pavement
on
arterial
street) 










4,600,000
 26
Madison WI Streets/Roads Pavement
maintenance
to
avoid
further
deteriora3on
and
costly
reconstruc3on 










8,000,000
 45
Madison WI Transit Purchase
5
addi3onal
electronic
signs
to
provide
real‐3me
route
and
schedule
informa3on
for
customers
at

power
equipped
shelters
on
State
Street,
the
Square
and
other
loca3ons. 














65,000
 0
City State Program Project
Descrip3on Funding
Required Jobs
Madison WI Transit Replace
4
high‐floor
paratransit
coaches
with
libs
budgeted
for
2009
with
4
low‐floor
coaches
with
ramps
‐‐

Benefits
will
include
improved
accessibility
for
people
with
disabili3es. 












248,000
 1
Madison WI Transit Upgrade
security
cameras
and
communica3on
technology
between
transfer
points,
the
police
department
and

Metro 












150,000
 1
Madison WI Transit Cannonball
Bike
Trail,
Phase
1
‐‐
to
connect
Greenway
View
to
the
Capital
City
Bike
Trail











1,050,000
 6
Madison WI Transit Aberg
Avenue
Pedestrian
Bridge
‐‐
installa3on
of
this
bridge
completes
the
Starkweather
Bike
Trail
and

connects
MATC
and
the
Truax
Airpark
with
the
Capital
City
Trail 










1,380,000
 8
Madison WI Transit Train
Sta3ons
to
serve
highspeed
rail 










2,000,000
 11
Madison WI Transit Replace
12
diesel
buses
budgeted
for
2010
with
12
hybrids
‐‐
benefits
include
improved
fuel
economy
and

fewer
emissions 










2,280,000
 13
Madison WI Water Installa3on
of
Proprietary
Stormwater
Treatment
Catchbasins
in
the
Capital
Neighborhood 












800,000
 5
Madison WI Water Nakoma
Water
Main
Reloca3ons
‐‐
pipeline
improvement
and
service
upgrade













450,000
 5
Madison WI Water Pipeline
crossing
Hwy
30
to
improve
pressures
and
overall
water
service 












450,000
 5
Madison WI Water Pressure
Zone
5
piping
upgrade 












300,000
 5
Madison WI Water Unit
Well
25
Pumping
Sta3on
Upgrade













200,000
 5
Madison WI Water Replace
Wingra
Dam
 










1,100,000
 6
Madison WI Water Arbor
Hills
Pumping
Sta3on
Construc3on
to
increase
water
supply
for
fire
figh3ng
and
service
reliability 










1,000,000
 8
Madison WI Water Supervisory
Control
and
Data
Acquisi3on
(SCADA)
‐‐
improve
overall
system
opera3on,
energy
conserva3on,

water
conserva3on,
and
security 










1,500,000
 8
Madison WI Water Booster
Pumping
Sta3on
115
Upgrade













400,000
 9
Madison WI Water Cannonball
Trail
Water
Transmission
Main











2,500,000
 14
Madison WI Water Water
U3lity
opera3ons
center
upgrade
to
improve
employee
safety,
working
condi3ons,
and
produc3vity. 










3,500,000
 20
Madison WI Water Install
iron
and
manganese
filters
to
improve
water
quality
and
customer
sa3sfac3on 










3,750,000
 21
Madison WI Water Cherokee
Marsh
‐‐
Urban
stormwater
diversion
to
protect
marsh,
stormwater
management
pond,
replace

restrooms,
pave
exis3ng
roadway/parking 










4,300,000
 25
Madison WI Water Pipeline
replacement
projects
‐‐
Marston
Ave,
Few/Spaight,
Fox/Keyes,
S.
Mills
Street,
N.
Few
St.,
Lawrence
St,

Maple/Ludington,

Edgewood
Ave,
Marquefe
St,

Pickford/Knickerbocker 










2,925,000
 44
Madison WI Water Automa3c
water
meter
reading
‐‐
Convert
system
to
a
fixed
network
automa3c
meter
reading
system
to

improve
customer
service,
water
conserva3on,
asset
management,
and
data
collec3on 








11,000,000
 62
Milwaukee WI CDBG Customized
and
green
collar
job
training
in
the
30th
Street
Industrial
Corridor
‐‐
Provide
funds
to
corridor

employers
to
provide
skills‐specific
training
to
corridor
residents
for
"tradi3onal"
corridor
jobs.

Develop
job

training
program
for
residents
i 












750,000

Milwaukee WI CDBG Job
Training
‐
Dept.
of
Public
Works
Environmental
Services
in
partnership
with
the
Milwaukee
Area
Workforce

Investment
Board,
Inc.
and
BIG
STEP/Wisconsin
Regional
Training
Partnership
have
developed
the
Urban

Forestry
Training
Pilot
Program
‐
Connec3ng
 










2,000,000
 80
Milwaukee WI Energy Buildings
‐‐
Central
Library:

Media/Technology
Center. 










2,600,000

Milwaukee WI Energy Buildings
‐‐
Create
three
Express
Center
libraries. 










1,000,000

Milwaukee WI Energy Buildings
‐‐
Create
three
Regional
Libraries
($10
M
each). 








30,000,000

Milwaukee WI Energy Buildings
‐‐
Forestry
and
Sanita3on
Lincoln
Avenue
facility. 










2,500,000

Milwaukee WI Energy Buildings
‐‐
HVAC
upgrades
at
two
neighborhood
libraries. 










1,000,000

Milwaukee WI Energy Buildings
‐‐
Install
green
roof
on
Central
Library. 










1,000,000

Milwaukee WI Energy Buildings
‐‐
New
East
Library
(joint
use) 










2,500,000

Milwaukee WI Energy Buildings
‐‐
New
Villard
Library
(joint
use) 










2,500,000

Milwaukee WI Energy Buildings
‐‐
Zablocki
Library:

replace
HVAC,
carpet,
3le
installa3on. 












750,000

Milwaukee WI Energy City
Building
Energy
Efficiency
‐‐
Retrofit
exis3ng
ligh3ng,
HVAC,
windows,
building
systems,
etc.
that
reduce

energy
consump3on. 










5,000,000

Milwaukee WI Energy Opera3ng
Systems
‐‐
RFID
&
Self‐Check
technology
(par3ally
funded
in
2009
budget,
total
project
cost
$3.5

million). 










1,500,000

Milwaukee WI Energy Street
Ligh3ng
Energy
Efficiency
‐‐
Retrofit
10%
of
exis3ng
city
street
ligh3ng
with
emerging,
energy
reducing

LED
technology. 








14,000,000

Milwaukee WI Energy Urban
agriculture
project
‐‐
Acquire
3‐story,
20,000‐SF
building
and
combine
with
adjacent
City‐owned
2‐acre

parcel
to
create
a
grower‐to‐market
economic
opportunity. 












772,000

Milwaukee WI Energy Milwaukee
Energy
Efficiency
(Me2)
‐‐
Retrofit
much
of
the
city's
building
stock
by
allowing
property
owners

and
renters
to
implement
energy
efficiency
measures
with
immediate
savings
and
no
upfront
costs.

It
saves

customers
money,
helps
reduce
greenhouse 








20,000,000
 300
Milwaukee WI Housing Conserve
natural
resources
‐‐
Replace
15%
of
our
fleet
with
energy‐efficient
vehicles,
which
will
also
reduce

ongoing
opera3ng
costs.

Install
passive
solar
systems
and
green
roofs
on
high‐rises
for
the
elderly
and

disabled. 










5,400,000

Milwaukee WI Housing Develop
quality,
affordable
rental
housing
‐‐
Revitaliza3on
of
over
800
units
of
affordable
housing
for
seniors,

families,
and
disabled,
including
the
acquisi3on
and
rehabilita3on
of
foreclosed
proper3es. 








56,000,000

Milwaukee WI Housing Lead
Abatement
‐‐
Provide
funding
to
abate
lead
in
1,000
housing
units
including
related
administra3ve
and

laboratory
costs. 










5,000,000

Milwaukee WI Housing Redevelopment
of
former
T.C.
Esser
Paint
factory
site
‐‐
Remediate
and
redevelop
abandoned,
contaminated

factory
complex
into
housing. 










2,595,000

Milwaukee WI Housing Riverwalks
‐‐
Finish
court
ordered
ADA
improvement
on
riverwalks. 










2,000,000

Milwaukee WI Housing Security
and
Energy
‐‐
Provide
contrac3ng
opportuni3es
to
address
deferred
maintenance
needs,
which
would
include
pain3ng,

landscaping,
moderniza3on
of
elevators
for
seniors
and
disabled,
enhanced
security
systems,
etc. 










7,050,000

City State Program Project
Descrip3on Funding
Required Jobs
Milwaukee WI Housing Employment
and
Training
‐‐
Provide
cri3cal
employment
and
training
opportuni3es
for
a
minimum
of
70
youth,
young
adults
and

dislocated
workers. 










1,550,000
 70
Milwaukee WI Public
Safety 3rd
District
Police
‐‐
Renova3on
of
old
3rd
District
Sta3on
into
neighborhood
task
force
facility. 










1,000,000

Milwaukee WI Public
Safety Buildings
‐‐
Central
Library:

Masonry
repair,
pain3ng,
mechanical
upgrades,
solar
panels,
interior
finishes,
drive‐
up
window
upgrade,
Centennial
Hall
upgrades. 










2,090,000

Milwaukee WI Public
Safety Buildings
‐‐
Central
Library:

Restora3on
of
Mosaic
and
Scagiola
in
Rotunda. 










5,000,000

Milwaukee WI Public
Safety Buildings
‐‐
City
Hall
‐‐
8th
Floor
City
Aforney
Offices 










5,700,000

Milwaukee WI Public
Safety Buildings
‐‐
Lower
Parking
floor
replacement
in
Zeidler
Municipal
Building. 










1,300,000

Milwaukee WI Public
Safety Buildings
‐‐
Replace
hollow
walk
and
founda3on
stabiliza3on/repair
of
City
Hall. 








11,700,000

Milwaukee WI Public
Safety Buildings
‐‐
Zeidler
Municipal
Building
elevator
moderniza3on
project. 










1,200,000

Milwaukee WI Public
Safety Engine
House
Replacement
‐‐
Replace
Fire
Engine
House
#8
and
#17. 










8,400,000

Milwaukee WI Public
Safety Police
Administra3on
Building
‐‐
Upgrade
building
systems
and
asbestos
abatement. 










5,000,000

Milwaukee WI Public
Safety Police
Cars
‐‐
Replace
100
police
cars. 










3,500,000

Milwaukee WI Public
Safety Repair
Shop
‐‐
Replace
exis3ng
inadequate
Fire
equipment
repair
facility
with
new
facility. 








15,000,000

Milwaukee WI Public
Safety Various
Police
Facili3es
‐‐
Improvements
and
building
system
upgrades
to
6
police
district
sta3ons
and

evidence
storage
facility. 










5,000,000

Milwaukee WI Schools UWM‐Engineering
School
‐‐
Purchase
downtown
land
and
prepare
land
for
the
new
loca3on
of
the
UWM‐
Engineering
School. 










5,000,000

Milwaukee WI Streets/Roads 440th
Air
Force
Reserve
Base
redevelopment
‐‐
To
accommodate
redevelopment
of
the
property
previously

occupied
by
the
440th
Air
Force
Reserve
Base,
closed
February
2,
2008
under
the
Base
Realignment
and

Closure
Act
of
2005,
provide
funds
to
separate
prope 










4,000,000

Milwaukee WI Streets/Roads Alleys
‐‐
Complete
100+
deferred
alley
construc3on
and
maintenance
projects. 








15,000,000

Milwaukee WI Streets/Roads Bridges
‐‐
Maintenance
on
six
ver3cal
lib
bridges. 








13,090,000

Milwaukee WI Streets/Roads Buildings
‐‐
Salt
Dome
at
Ruby
Garage. 










1,200,000

Milwaukee WI Streets/Roads Facility
grounds
‐‐
Slope
stabiliza3on,
regrading,
sidewalks,
railings,
ligh3ng,
road
repair/replacement. 










3,000,000

Milwaukee WI Streets/Roads Residen3al
redevelopment
at
31st/Galena
‐‐
Remediate
parcels
and
design
and
install
infrastructure
for

residen3al
development. 












550,000

Milwaukee WI Streets/Roads Street
Construc3on
‐‐
Complete
2003‐2008
deferred
street
project
list. 








10,000,000

Milwaukee WI Streets/Roads Street
Construc3on
‐‐
Increase
construc3on
to
improve
street
condi3on
based
on
audit
of
the
residen3al
street

program. 








41,600,000

Milwaukee WI Streets/Roads Street
Ligh3ng
‐‐
Accelerate
control
circuitry
replacement. 










5,000,000

Milwaukee WI Streets/Roads Street
Ligh3ng
‐‐
Replace
series
circuitry
to
improve
energy
efficiency. 










8,000,000

Milwaukee WI Streets/Roads Street
Maintenance
‐‐
Pavement
joint
repair,
asphalt
sealing,
asphalt
overlay,
pavement
crackfilling
and

sidewalk
improvement. 










5,000,000
 30
Milwaukee WI Streets/Roads Street
Construc3on
‐‐
Resurface
deteriora3ng
Port
roads. 










3,000,000
 116
Milwaukee WI Streets/Roads Redevelopment
of
former
Tower
Automo3ve
site
‐‐
Create
business
park
at
the
site
of
the
former
Tower

Automo3ve
auto
parts
plant.

Project
includes
demoli3on,
environmental
inves3ga3on
and
remedia3on,
and

design
and
installa3on
of
infrastructure
(st 








25,645,000
 700
Milwaukee WI Streets/Roads Brewery
Project
‐‐
Build
new
street
system
to
support
the
redevelopment
of
the
former
Pabst
Brewery
as

housing,
office
and
retail
uses.

Streets
are
designed
to
incorporate
bioswales
and
an
innova3ve
storm
water

management
system.

First
phase
of
street
 










3,005,000
 1500
Milwaukee WI Transit Mass
Transit
‐‐
Develop
and
implement
a
Connector
system/street
car
system
to
improve
access
to
downtown,

reduce
travel
3me
and
reduce
vehicle
emissions. 






100,000,000

Milwaukee WI Water Buildings
‐‐
New
porous
parking
lots
to
reduce
rain
runoff. 












325,000

Milwaukee WI Water Filtering
System
‐‐
Replace
media
filters
at
Linnwood
and
Howard
water
treatment
plants. 










4,000,000

Milwaukee WI Water Great
Lakes
Research
Facility
‐‐
Provide
Infrastructure
and
facili3es
support
for
the
recently
created
School
of

Freshwater
Science,
the
first
and
only
of
its
kind
in
the
U.S. 








10,000,000

Milwaukee WI Water Howard
Plant
‐‐
Howard
water
treatment
plant
west
clear
well
and
pump
room
roof
replacements. 










2,700,000

Milwaukee WI Water Linnwood
Plant
‐‐
Linnwood
water
treatment
plant
fluoride
chemical
feeds
system
replacement. 












750,000

Milwaukee WI Water Pipeline
‐‐
Reline
the
wash
water
tank
pipeline
at
the
Linnwood
Plant. 












500,000

Milwaukee WI Water Port
Expansion
‐‐
Move
container
yard
to
consolidate
open
space
for
addi3onal
Port
development
and
improve

Port
opera3onal
efficiency. 










3,000,000

Milwaukee WI Water Port
Facili3es
‐‐
Terminals,
demoli3on
of
old
facili3es,
tuck
poin3ng. 












475,000

Milwaukee WI Water Storage
Tank
‐‐
Greenfield
elevated
water
storage
tank
pain3ng
project. 










2,500,000

Milwaukee WI Water Storage
Tank
‐‐
Menomonee
water
storage
tanks
demoli3on
and
decommissioning. 










4,500,000

Milwaukee WI Water Various
O&M
Projects
‐‐
Various
maintenance
projects
at
all
Water
facili3es. 










1,875,000

Milwaukee WI Water Water
Mains
‐‐
Twenty‐eight
water
main
replacement
projects,
ranging
from
$45,000
to
$3.3
million. 










6,600,000

Milwaukee WI Water Water
Meter
Shop
‐‐
Replace
acid
cleaning
area,
valves,
piping,
test
benches. 












175,000

Milwaukee WI Water Sewer
‐‐
Complete
sanitary
sewer
rehab,
including
laterals,
for
three
systems
as
s3pulated
by
DOJ. 








23,000,000
 27
Milwaukee WI Water Sewer
‐‐
Complete
76
sewer
projects
that
reduce
sewer
overflow. 








31,430,000
 37
Milwaukee WI Water Various
Infrastructure
‐‐
Terminal
resurfacing,
dock
walls,
ship
aprons,
dredging,
phytoremedia3on
area. 












685,000
 45
Milwaukee WI Water Water
Business
Park
‐‐
Develop
a
200‐acre
business
park
and
incubator
space
that
serves
the
growing

freshwater
research
and
business
sectors
in
metropolitan
Milwaukee.

Assemble
and
remediate
land,
design

and
install
infrastructure.

This
project
supports 








15,000,000
 150
Milwaukee WI Water Breakwater
‐‐
Rehabilitate
deteriora3ng
Lake
Michigan
breakwater. 










5,000,000
 193
Milwaukee WI Water Major
Equipment
‐‐
Replace
crawler
crane
to
improve
export
capacity. 










4,100,000
 278
Milwaukee WI Water Business
Expansion/Facility
Reloca3on
‐‐
Relocate
exis3ng
solid
waste
transfer
sta3on
and
self‐help
recycling

center
at
Green
Tree
and
Industrial
Road
to
accommodate
expansion
of
business. 










7,000,000
 500
New
Berlin WI CDBG North
Lane
Storm
Sewer
Easement
Extension 












100,000
 10
New
Berlin WI CDBG Underwood
Creek
Streambank
Stabiliza3on 










2,500,000
 20
New
Berlin WI CDBG City
Center
Roadway
/
Stormwater
/
Streetscape
Improvements 










4,500,000
 40
New
Berlin WI CDBG Citywide
Stormwater
Drainage
Improvements 












250,000
 60
New
Berlin WI Energy City
Hall
Solar
panels 










1,200,000

City State Program Project
Descrip3on Funding
Required Jobs
New
Berlin WI Energy Wind
Turbine
w/Manufacturer 








15,000,000
 16
New
Berlin WI Public
Safety Controlled
Dispatch 












900,000
 4
New
Berlin WI Schools NB
West
HS
&
Middle
School
Sewer
Extension 












750,000
 30
New
Berlin WI Schools Eisenhower
HS 








15,000,000
 50
New
Berlin WI Streets/Roads 124th
street 












549,000

New
Berlin WI Streets/Roads Calhoun
Road
Rehabilita3on 










8,415,000

New
Berlin WI Water Rogers
Drive
Sewer
Rplcmnt 










2,700,530

New
Berlin WI Water Calhoun
water
main
extension 












231,000
 6
New
Berlin WI Water Lake
Michigan
Water
Remedia3on 










4,300,000
 8
New
Berlin WI Water Sewer
relining
(city
wide) 










1,000,000
 20
New
Berlin WI Water Parkland
Green
Water
main
replmt
and
pavement 










3,778,000
 23
Racine WI Energy Construc3on
of
a
green
roof
on
the
Public
Library 












400,000
 8
Racine WI Public
Safety Upgrades
to
911
Dispatch
Center 












450,000
 5
Racine WI Transit Purchase
of
2
buses
for
our
transporta3on
flee 












300,000
 4
Racine WI Water Airiline
Road
16"
Watermain
Replacement 












500,000
 6
Racine WI Water State
Street
12"
Main
Replacement 












520,000
 6
Racine WI Water Michigan
Boulvard
Interceptor
Improvements 












700,000
 7
Racine WI Water Newman
Road
24"
Water
Main
Replacement 












900,000
 9
Racine WI Water Ohio
Street
Interceptor
Improvements 










1,600,000
 16
Sheboygan WI CDBG 10th
Street
and
Florida
Avenue
Flood
Mi3ga3on
and
Reconstruc3on
including
storm
sewer,
curbing,
and
road

improvements 










2,160,000
 75
Sheboygan WI CDBG Indiana
Avenue
Street
Reconstruc3on,
including
reconstruc3on
of
water,
storm,
sanitary
sewer,
roadway,
street

ligh3ng. 












675,927
 75
Sheboygan WI CDBG Eisner
Avenue
Reconstruc3on,
including
bicycle
lanes/sidewalks,
new
u3li3es,
and
roadway
improvements 










3,838,676
 100
Sheboygan WI CDBG Central
Business
District
street
and
flood
mi3ga3on
improvements 










2,000,000
 200
Sheboygan WI CDBG Purchase
addi3onal
land
to
expand
the
Sheboygan
Business
Center
to
allow
for
more
industrial
development.
 










7,000,000
 800
Sheboygan WI CDBG Development
of
a
high‐end
technology
park
within
the
City
limits 








15,000,000
 1000
Sheboygan WI Energy Replace
old
windows
in
City
Hall
with
new
energy
efficient
windows
and
install
new
energy
efficient
ligh3ng

fixtures.

Upgrade
HVAC
system
to
meet
the
current
needs
of
the
building. 












300,000
 75
Sheboygan WI Public
Safety Addi3onal
police
officers
on
the
street
to
deal
with
street
crime
issue
such
as
drugs,
violence,
criminal
damage

and
make
LMI
neighborhoods
more
safe. 












750,000
 8
Sheboygan WI Streets/Roads Construc3on
of
a
Pedestrian
Bridge
over
the
Sheboygan
River
to
retain
jobs
and
development
addi3onal
jobs

to
a
pennisula
area 










7,000,000
 35
Sheboygan WI Transit Provide
feeder
services
bus
route
to
the
Central
Business
District
from
outlying
areas
to
get
people
to
jobs
in

the
downtown
area. 












250,000
 50
Sheboygan WI Transit Add
addi3onal
bus
routes
to
Metropolitan
Areas
to
allow
LMI
persons
to
get
jobs
outside
of
the
City
limits. 












350,000
 75
Sheboygan WI Transit Eliminate
or
reduce
bus
fares
for
one
year
to
increase
ridership
to
encourage
usage
of
the
public
transit
system

and
allow
people
to
get
to
employment
opportuni3es 












500,000
 100
Sheboygan WI Transit Purchase
new
energy‐efficient
transit
buses
to
replace
aged
buses
and
provide
befer
gas
mileage. 












500,000
 100
Sheboygan WI Water Perform
sanitary
sewer
lining
of
various
segments
of
the
City's
sanitary
sewer
system. 












300,000
 50
Superior WI CDBG 28th
Street
Culvert
Lining.

Lining
of
a
48
inch
culvert
carrying
flow
from
a
tributary
of
Faxon
Creek. 














10,000

Superior WI CDBG City
of
Superior
Milling
and
Overlay
Projects.

This
project
consists
of
a
3.25
inch
mill
and
HMA
overlay
on

various
streets
in
Superior.
 










2,000,000

Superior WI CDBG Hill
Avenue
Culvert
Rehabilita3on.

Rehabilita3on
of
an
8
foot
by
8
foot
arch
culvert
under
Hill
Avenue
on
Faxon

Creek
in
the
city
of
Superior. 














75,000

Superior WI CDBG Moccasin
Mike
Road.

Reconstruc3on
of
1.9
miles
of
roadway
accessing
the
city
of
Superior
landfill
and

Wisconsin
Point
recrea3on
area. 










2,300,000

Superior WI CDBG Superior
Animal
Rescue
Building.
A
new
state‐of‐the‐art
eco‐conscious
"green
Animal
Rescue
Founda3on

building
for
the
City
of
Superior. 










2,102,000

Superior WI CDBG Wetland
Mi3ga3on
Bank.

Development
of
a
wetland
mi3ga3on
bank
in
support
of
the
city's
SAMP
Banking

Program. 












420,000

Superior WI CDBG Winter
Street
Industrial
Park.

Development
of
a
6
lot
Industrial
Park
located
in
Superior,
WI 










1,750,000

Superior WI CDBG Wisconsin
Point
Road.

Reconstruc3on
of
3.4
miles
of
roadway
and
associated
parking
accessing
the
Wisconsin

Point
recrea3on
area. 










3,500,000

Superior WI Energy Superior
Landfill
Gas
to
Energy.
This
project
includes
crea3ng
power
genera3on
at
the
Superior
Landfill
from

landfill
methane. 










2,000,000

Superior WI Schools Great
Lakes
Elementary
School
Access
and
Parking
Modifica3ons.

Reconfigura3on
of
access
points
and
parking

areas
at
Great
Lakes
Elementary
School.
 












150,000

Superior WI Streets/Roads 28th
St.
Reconstruc3on.

Reconstruc3on
of
.85
miles
of
28th
Street. 










2,900,000

Superior WI Streets/Roads Arrowhead
Pier.
This
project
will
replace
the
exis3ng
structure
with
a
new
fishing
pier
and
associated
site

improvements
to
support
the
pier. 












800,000

Superior WI Streets/Roads Bardon
Road
Reconstruc3on.

Reconstruc3on
of
.9
miles
of
Roadway
adjacent
to
the
city
of
Superior
Golf

Course. 












450,000

Superior WI Streets/Roads Billings
Park
Storm
Sewer
&
Water
Quality
Basin.

This
project
will
ul3mately
reduce
stormwater
and
surface

water
flows
to
combined
sewers
through
construc3on
of
a
system
of
separate
storm
sewers. 










4,700,000

Superior WI Streets/Roads City
of
Superior
Salt
Storage
Facility.

This
project
will
greatly
increase
the
city's
salt
storage
capacity. 












750,000

Superior WI Streets/Roads Citywide
Sidewalk
Replacements.

This
project
will
consist
of
replacing
and
reparing
old
and
deteriora3ng

sidewalks
throughout
the
city
as
determined
by
the
City
of
Superior
Sidewalk
Replacement
Program. 










2,000,000

Superior WI Streets/Roads Montreal
Pier
Sheet
Piling.
This
project
will
enable
new
mari3me
business
and/or
research.
 










7,500,000

Superior WI Streets/Roads South
Superior
Stormwater
Interceptor.

Project
will
included
installa3on
of
a
stormwater
interceptor
and
a

network
of
sewer
mains. 










1,700,000

Superior WI Streets/Roads Tower
Ave.
Concrete
Rehabilita3on.
Concrete
Rehabilita3on
for
four
miles
of
Tower
Ave. 










1,000,000

Superior WI Streets/Roads USH
2
Off
Ramp
to
Susquehanna
Ave.

Development
of
an
off
ramp
from
USH
2
to
the
industrial
park
on

Susquehanna
Ave. 










1,500,000

City State Program Project
Descrip3on Funding
Required Jobs
Superior WI Water Lib
Sta3on
04/Upstream
Piping
Reconstruc3on.

The
project
is
to
remove
the
flow
restric3on
with
installa3on

of
appropriately
sized
piping.
 














75,000

Superior WI Water Lib
Sta3on
07/Upstream
Piping
Reconstruc3on.

The
project
will
replace
undersized
piping
with
larger

diameter
piping.
 












175,000

Superior WI Water Newton
Creek/Sanitary
Sewer
Reconstruc3on.

The
project
will
mi3gate
a
known
sanitary
sewer
overflow

loca3on. 












150,000

Superior WI Water Sanitary
Sewer
Treatment
Plant
Ultra
Violet
Disinfec3on
Conversion.

 










1,100,000

Superior WI Water Sanitary
Sewer
Treatment
Plant.

This
project
entails
establishing
a
pH
adjustment
system
for
the
main

treatment
plant
in
order
to
maintain
ammonia
compliance
with
our
upcoming
permit. 










1,600,000

Superior WI Water Tower
Ave.
Combined
Sewer
Repair
and
Rehabilita3on.

This
rehabilita3on
will
alleviate
flooding
in
the
area.
 












450,000

Waukesha WI CDBG New
Fire
Sta3on
No.
2 










3,400,000
 165
Waukesha WI CDBG New
Fire
Sta3on
No.
3 










3,500,000
 168
Waukesha WI Streets/Roads Coolidge
Ave
(Scof
Ave‐
S.
Grand
Ave)‐‐Reconstruc3on 












197,000
 9
Waukesha WI Streets/Roads W.
Roberta
Ave
(Scof
Ave‐Grand
Ave)‐‐Reconstruc3on 












199,000
 10
Waukesha WI Streets/Roads Chicago
Ave
(Hyde
Park
Ave‐Randall
St)‐‐Paving 












253,000
 12
Waukesha WI Streets/Roads Scof
Ave
(Coolidge
Ave‐Newhall
Ave)‐‐Reconstruc3on 












984,000
 47
Waukesha WI Streets/Roads W.
St.
Paul
Ave
(Wisconsin
Ave‐North
Ave)‐‐Reconstruc3on 










1,100,000
 53
Waukesha WI Streets/Roads N.
Grand
Ave
(Laflin
Ave‐Harrison
Ave)‐‐Reconstruc3on 










1,290,000
 62
Waukesha WI Streets/Roads Arcadian
Ave
(Eugene
Ct.‐Anitol
Street)‐‐Reconstruc3on
and
paving 










1,624,000
 78
Waukesha WI Water Coolidge
Ave
(Scof
Ave‐S.
Grand
Ave)‐‐Sanitary
sewer
Reley 














78,000
 4
Waukesha WI Water W.
Roberta
Ave
(Scofb
Ave‐S.
Grand
Ave)‐‐Sanitary
sewer
Reley 














79,000
 4
Waukesha WI Water Coolidge
Ave
(Scof
Ave‐S.
Grand
Ave)‐‐water
Main
Reley 












118,000
 6
Waukesha WI Water W.
Roberta
Ave
(Scofb
Ave‐S.
Grand
Ave)‐‐Water
Main
Reley 












118,000
 6
Waukesha WI Water Chicago
Ave
(Hyde
Park
Ave‐Randall
Street)‐‐Water
Main
Reley 












209,000
 10
Waukesha WI Water N.
Grand
Ave
(Laflin
Ave‐Harrison
Ave)‐‐Water
Main
Reley 












427,000
 20
Waukesha WI Water Scof
Ave
(Coolidge
Ave‐Newhall
Ave)‐‐Water
Main
Reley 












495,000
 24
Waukesha WI Water N.
Grand
Ave
(Laflin
Ave‐Harrison
Ave)‐‐Sanitary
sewer
Reley 












534,000
 26
Waukesha WI Water Arcadian
Ave
(Eugene
Ct‐
Anitol
Street)‐‐Sanitary
sewer
Reley 












590,000
 28
Waukesha WI Water Summit
Ave
(Bidwell
Ave‐Moreland
Blvd)
Water
Main
relay 












735,000
 35
Waukesha WI Water Scof
Ave
(Coolidge
Ave‐Newhall
Ave)‐‐Sanitary
sewer
Reley 










1,193,000
 57
Waukesha WI Water S.
Commanche
Ln
(MacArthur
Rd‐Crestwood
Dr)‐‐Water
supply
improvement 










1,242,000
 60
Waukesha WI Water Westowne
subdivision‐‐Sanitary
sewer
lining 










1,287,000
 60
Athens WV Energy Costruc3on
of
3,000
square
foot,
LEED
cer3fied
town
hall 












700,000
 20
Big
Piney WY CDBG Town
Maintenance
Building 












300,000
 10
Big
Piney WY Streets/Roads Big
Piney
Streets
Reconstructoin
(P.L.
Lane
Area) 










1,200,000
 15
Big
Piney WY Streets/Roads Big
Piney
Streets
Reconstructoin
(South
of
Budd) 










1,830,000
 26
Big
Piney WY Streets/Roads Big
Piney
Streets
Reconstruc3on
(North
of
Budd) 










2,200,000
 30
Casper WY CDBG Alley
Paving
in
CDBG
Eligible
Areas 












100,000

Casper WY CDBG Casper
Soccer
Complex
‐
Install
Light
on
2
Fields 












300,000

Casper WY CDBG Containerized
Trash
Collec3on
in
CDBG
Eligible
Areas 














50,000

Casper WY CDBG Renovate
North
Casper
Historical
Community
Clubhouse 














80,000
 4
Casper WY CDBG Town
Square
Public
Space
‐
W.
Yellowstone
Economic
Development
District 










1,600,000
 20
Casper WY CDBG Field
of
Dreams
Baseball
Complex
‐
3
Field
Complex 










2,500,000
 25
Casper WY CDBG Ft.
Casper
Phase
II
Neighborhood
Infrastructure
Reconstruc3on
Project
‐
Roads,
Drainage,
Water,
Sewer,

Sidewalks 










6,800,000
 35
Casper WY Energy Alternate
Energy
Consultant
Services
at
Water
Treatment
Facility
and
Wastewater
Treatment
Facility 












350,000

Casper WY Energy Casper
Events
Center
Retrofit
Ligh3ng
to
Energy
Savings
Technology 












450,000

Casper WY Energy Casper
Events
Center
Window
Replacements 












150,000

Casper WY Energy City
Center
Replacement
of
50
Year‐Old
Inefficient
HVAC
with
Energy
Efficient
Models 












220,000

Casper WY Energy Energy
Retrofits
to
Municipal
Buildings 












500,000

Casper WY Energy Installa3on
of
Energy
Efficient
LED
Lights
in
City
Center
Parking
Lot 












180,000

Casper WY Energy Installa3on
of
Solar
School
Crossing
Flashers 












264,000

Casper WY Energy Recrea3on
Center/Aqua3cs
Center
Solar
Panels 














95,000

Casper WY Energy Vehicle
Replacement
to
Hybrids,
Alternate
Fuels 












150,000

Casper WY Energy Wastewater
Treatment
Plant
‐
Co‐Generator
(Methane,
Electric) 












200,000

Casper WY Energy Casper
Service
Center/Garage
Light
Retrofit
to
Energy
Saving
LED 












200,000
 5
Casper WY Energy Streetlight
Retrofit
to
Energy
Saving
LED 












350,000
 10
Casper WY Energy Tree
Plan3ng
‐
Increase
Tree
Canopy
to
Reduce
Urban
Heat
Island
Effect 












250,000
 12
Casper WY Energy Casper
Events
CEnter
Energy
Savings
Improvements
(HVAC,
Boiler,
Air
Handlers,
Pumps) 










4,900,000
 35
Casper WY Public
Safety Emergency
Generator
at
Casper
Service
Center 












350,000

Casper WY Public
Safety Emergency
Vehicle
Detectors
at
Signalized
Intersec3ons 










1,100,000

Casper WY Public
Safety Fire
Sta3on
No.
3
Replacement 










4,500,000

Casper WY Public
Safety Fire
Sta3on
Renova3ons 












350,000

Casper WY Public
Safety Police/Fire
Mobile
Data
Systems 












280,000

Casper WY Public
Safety Public
Safety
Training
Center
Technology 














90,000

Casper WY Public
Safety Radio
System
Expansion
‐
Emergency
Management 












130,000

Casper WY Streets/Roads Traffic
Signal
Upgrades
to
12"
Heads/LEDs 












220,000

Casper WY Streets/Roads Concrete
Street
In‐Laid
Traffic
Markings 












200,000
 6
Casper WY Streets/Roads Municipal
Garage
Elevator
Replacements 












400,000
 6
Casper WY Streets/Roads Durbin
Street
Reconstruc3on 












450,000
 10
Casper WY Streets/Roads Fairgrounds
Road/Casper
Street
Drainage
Improvements 












450,000
 10
City State Program Project
Descrip3on Funding
Required Jobs
Casper WY Streets/Roads 15th/Missouri
Street
Traffic
Signal 












350,000
 12
Casper WY Streets/Roads 15th/Beverly
Street
Intersec3on
Improvements 












650,000
 15
Casper WY Streets/Roads Annual
Residen3al
Street
Overlay
Program 












800,000
 15
Casper WY Streets/Roads Municipal
Garage
Security
Improvements 












220,000
 15
Casper WY Streets/Roads I‐25/Wy.
Boulevard
Beau3fica3on/Landscaping
Improvements 












150,000
 20
Casper WY Streets/Roads Walkability
(Alterna3ve
Travel)
Improvements 












450,000
 20
Casper WY Streets/Roads Annual
Arterial/Collector
Rehabilita3on 










3,000,000
 28
Casper WY Streets/Roads Casper
Mountain
Road
‐
Widen
and
Reconstruc3on 












600,000
 28
Casper WY Streets/Roads David
Street
Extension 










1,200,000
 28
Casper WY Streets/Roads Buckboard
Road
Reconstruc3on 










1,300,000
 30
Casper WY Streets/Roads Paradise
Drive
Roadway,
Water,
Sewer,
Drainage
Reconstruc3on 










4,800,000
 35
Casper WY Streets/Roads West
Yellowstone
Phase
II
Reconstruc3on/Urban
Renewal
Area 










4,500,000
 50
Casper WY Transit 3
New
Hybrid
Buses 












450,000
 5
Casper WY Transit Rails
to
Trails/Greenways,
Paths
and
Ameni3es 










1,000,000
 25
Casper WY Water Floa3ng
Covers
‐
Digesters
at
Wastewater
Treatment
Facility 










1,200,000
 10
Casper WY Water Annual
Sewer
Rehabilita3on 










1,000,000
 12
Casper WY Water Oakcrest
Watermain 












450,000
 12
Casper WY Water Biosolids
Compos3ng/Disposal
Facility 










1,000,000
 15
Casper WY Water Water
Treatment
Facility
Emergency
Backup
System 










3,000,000
 15
Casper WY Water Zone
IV
Water
System
Improvements 












900,000
 15
Casper WY Water 10
MG
Reservoir
Renova3on 










5,000,000
 20
Casper WY Water Downtown
Low
Pressure
Watermain
Improvements 










1,600,000
 20
Casper WY Water Amoco
Road
Zone
II
B
Watermain
Extension/Booster
Sta3on 










2,700,000
 25
Dixon WY Water Wastewater
Lib
Sta3on
&
Collec3on
Improvements 












600,000
 3
Dixon WY Water Water
system
improvements 












600,000
 3
Elk
Mountain WY Water Water
Supply
Improvements 










4,400,000
 8
Hanna WY Water Watewater
Treatment
Plant 










3,200,000
 16
Hanna WY Water Water
Storage
Tank 










1,700,000
 17
Hanna WY Water Water
Treatment
Plant
Upgrade 










2,000,000
 20
Hanna
 WY Water Water
Source
Development 










1,000,000
 10
LaBarge WY Water Construct
Water
Treatment
Plant 










1,500,000
 8
Marbleton WY CDBG Community
Buildinjg
/
Recrea3on
Center 








30,000,000
 250
Marbleton WY Energy Wind
trubine
power
genera3on
to
offset
energy
use
associated
with
wastewater
aerators 












500,000
 10
Marbleton WY Streets/Roads Alsade
Drive
curb,
gufer,
paving 












414,000
 8
Marbleton WY Streets/Roads Eiden
Curb,
Gufer,
Paving 










2,686,000
 33
Marbleton WY Streets/Roads Phase
III
‐
Marbleton
Streets
sidewalks
and
flatwork 










2,735,500
 35
Marbleton WY Water Main
water
lines
(East
to
West) 












497,000
 8
Marbleton WY Water Well
#7
‐
Flouride
removal
‐
treatment 












640,000
 8
Marbleton WY Water Water
tower
replacment 












980,000
 20
Marbleton WY Water Aerated
Wasterwater
Treatment
Laggoons.

Project
could
include
Wind
Turbines
to
offset
aerator
energy
use.

Project
is
par3ally
locally
funded.

Overall
lagoon
cost
is
$4.6
million
exclusive
of
$500,000
wind
turbines.

 










2,000,000
 75
Medicine
Bow WY Water Fire
Flow
Improvements 










1,500,000
 6
Saratoga WY Water Water
Meters
&
Distribu3on
Improvements 










5,900,000
 30
Star
Valley
Ranch WY CDBG Vista
Drive
Road
Reconstruc3on
and
U3li3es
‐
Commericial
District
Development 










1,600,000
 25
Star
Valley
Ranch WY Water Water
Meters
for
Conserva3on
and
Control 










1,275,000
 15
Star
Valley
Ranch WY Water Water
Supply
Wells
(2) 










1,500,000
 15
Star
Valley
Ranch WY Water Domes3c
water
supply,
storage,
various
improvements
as
outlined
in
Level
I
Masterplan
‐
PHASE
I
‐
Prater
tank,

SCADA,
Well
Comple3on
(par3ally
funded)













850,000
 30
Star
Valley
Ranch WY Water Domes3c
Water
Supply
Improvments
Phase
II
as
outlined
in
Level
I
Masterplan
‐
Transmissoin
Lines,
GC
Tank,

etc. 










3,000,000
 40
Star
Valley
Ranch WY Water Replacement
of
deteriorated
and
undersized
Distribu3on
Piping 










9,500,000
 125
M

THE UNITED STATES CONFERENCE OF MAYORS

Tom Cochran, CEO and Executive Director

1620 Eye Street, NW


Washington, DC 20006
Tel: 202.293.7330
Fax: 202.293.2352
Email: tcochran@usmayors.org
usmayors.org

You might also like