UNIT : SINGAPORE DOLLARS UNIT RATES Pipe - Schedule 40 & Schedule 80, Bend and Flanges i) Straight steel

pipe renewal (on deck) Sch 40 Renewal/m Per Bend 60 25 70 40 110 55 130 60 160 75 200 85 245 120 300 150 365 190 490 300 650 420 910 553 1,095 698 1,275 858 1,485 1028 Sch 80 Renewal/m Per Bend 70 25 85 40 130 55 160 60 200 85 235 100 300 145 385 200 455 265 640 460 875 670 1,160 904 1,675 1167 1,935 1422 2,255 1687

Dia (mm) 12 25 40 50 65 75 100 125 150 200 250 300 350 400 450 ii) Renewal of flange Dia (mm) 25 40 50 65 75 100 125 150 200 250 300 350 400 450 Note : 1)

(Based on JIS Standard 10K type) Per Pc 90 100 120 135 180 255 315 390 565 630 840 1085 1335 1590

In case pipe length of each piece is less than two (2) metres, price to be applied as 2M.

2) Stagings, insulations, clamp, support, access work, high tension bolts and nuts, metallic gaskets, deck and bulkhead penetration piece, surface preparation and coating of pipes extra.

3) Remove/refit pipe for inspection - 60% of renewal price. 4) Additional charge Description a) Pre-galvanised pipe b) Pipes located in i) Accommodation room

Percentage Increase 25 5

Naga 1 - Unit Rates

Page 1

UNIT : SINGAPORE DOLLARS ii) Engine room iii) Pumproom and tank iv) Double Bottom and duct keel 25 30 30

5) Yorcalbro pipes, heating coils and hydraulic pipes will be treated separately. 6) For intermediate pipe size the next higher size to be applied. Valve Work 1. Sea Valve Open up cover, remove spindle, clean and check for survey in place, grind in and close up with new packing Dia (mm) 25 50 75 100 125 150 175 200 250 300 350 400 450 500 Price Per Valve Globe Gate 90 115 115 155 170 195 210 250 250 300 290 350 325 405 375 460 450 560 530 675 610 770 690 880 770 980 845 1,090

Note: Overhauling in shop to be charged 100% extra.

2.

Storm Valve Open up, check, clean and close in place Dia (mm) 50 75 100 125 150 200 Price Per Valve 70 85 100 115 130 170

Note: Staging to be charged extra 3. Butterfly valve (on deck) (i) Remove from line, clean, check, repack and reinstall in place. (ii) Renew owner supply seat ring

Naga 1 - Unit Rates

Page 2

UNIT : SINGAPORE DOLLARS Dia (mm) 50 100 150 200 250 300 350 400 450 500 Price Per Valve (i) (ii) 150 85 260 95 370 110 490 120 605 150 720 175 825 205 920 230 1,025 260 1,120 285

Note: 1) Staging to be extra 2) Overhaul in shop to be charged 100% extra. 3) Following locations to be extra. Valve in Engine room Pumproom and tank Double Bottom tank and Duct Keel

20% extra 30% extra 35% extra

4.

Valve Renewal (On deck) Dia (mm) 25 50 100 150 200 250 300 350 400 450 500 Price Per Valve 45 60 95 150 210 275 330 395 450 510 560

Note: 1) Valves to be supplied by Owner. 2) Staging, H.T. bolt and nut, metallic gasket, insulation, removal for access, hydro test and drilling and/or modifying of flange and bolt hole to be extra. 3) Following locations to be extra. Valve in Engine room 20% extra Pumproom and tank 30% extra Double Bottom tank and Duct Keel 35% extra Painting of Pipework Gritblasting and Painting of Pipe Pipe Dia Gritblast to SA 2.5 Additional

Naga 1 - Unit Rates

Page 3

UNIT : SINGAPORE DOLLARS (mm) Below 250A Below 450A Below 550A Below 600A Above 600A external pipe + 1 coat 30 35 40 45 50 coat/meter 3.00 4.00 5.00 5.50 8.25

Note: 1) On deck - 15% extra to be charged. 2) In Tank - 25% extra to be charged. 3) In Double Bottom - 30% extra to be charged. Magnetic Particle Inspection Note: A minimum charge of 4m length per location to apply. Unit Price SG $ 75 per m length

Dye Penetrant Test Ultrasonic Thickness Gauging Note: 1) A minimum charge of 200 spots per day to apply. 2) Staging and accessory work to be charged extra. X-ray Note: A minimum charge of SG $ 400 per team per day to apply. Staging Staging, Location tanks Staging, Structures Staging, Hanging type Note: A minimum charge of 30m per location will apply.

Unit Price SG $ 950 per team Unit Price SG $ 3.50 per spot

Unit Price SG $ 55 per shot

Unit Price SG $ 5.00 per m Unit Price SG $ 5.00 per m Unit Price SG $ 6.50 per m

Steelwork Rates Renew mild steel Lloyds grade "A" plate Unit Price SG $ 12.00 per kg Note: 1) Additional charges i) Steel plate with single curvature 15% extra of above rate. ii) Steel plate with double curvature 20% extra of above rate. iii) Corrugated bulkhead 15% extra of above rate. iv) Plating without renewal of stiffeners 10% extra of above rate. v) Bulbous bow, coffin plate, soft nose and stern plate 70% extra of above rate. vi) High tensile steel plate (EH 36) 20% extra of above rate. (subject to prevailing market rate of high tensile steel) vii) Work in way of peak tanks, double bottom, engine room, 25% extra of above rate. pump room, cofferdams, void spaces, deep tanks and chain locker. 2) Staging, removals, fairing, all forms of testing, tank cleaning, gas freeing for hot work, special block arrangement and other access work to be extra. 3) A minimum charge of 500kg per location or tank will be applied. 4) Minimum charge of 30kg per piece will be applied. 5) Steel weight to be calculated basis greatest length x greatest breadth x thickness as fitted by shipyard x 8.0

Naga 1 - Unit Rates

Page 4

UNIT : SINGAPORE DOLLARS 6) Above rates will not apply to scattered and loose piece steel work.

Labour Rates Shipyard's labour rates (normal time) : Labour skilled Labour unskilled Machinist Fitters Welders (4G) Electrician Engineer Draftsman Designer Foreman Note: 1) Above rates do not apply to specialist services. 2) Overtime work to be 50 percent extra of above rates. 3) Sunday / Public Holiday to be 100 percent extra of above rates. Shipyard's normal working hours : Monday to Friday Saturday Meal break : Monday to Thursday Friday 1230 - 1330 hours 1230 - 1430 hours 0800 - 1630 hours 0800 - 1230 hours

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

SG $ SG $ SG $ SG $ SG $ SG $ SG $ SG $ SG $ SG $

33.00/man/hour 21.00/man/hour 33.00/man/hour 33.00/man/hour 33.00/man/hour 33.00/man/hour 45.00/man/hour 33.00/man/hour 33.00/man/hour 30.00/man/hour