You are on page 1of 57

2012

Matriaux rendu chantier

Mohamed KAMAGATE
KAMAGATE E.
09/08/2012

Table des matires


AVANT-PROPOS....................................................................................................................................................................... 6
I.

AGREGATS DE RIVIERE ........................................................................................................................................... 7

1.

T.V.O ........................................................................................................................................................................................ 7

2.

SABLE : 0/3 .......................................................................................................................................................................... 7

3) GRAVIER : 3/8 ....................................................................................................................................................................... 8


4) GRAVIER :8/15 ....................................................................................................................................................................... 8
5) GRAVIER : 15/25 ................................................................................................................................................................... 8
6) MOELLON ORDINAIRE : (Pierre sche de sablire 40/60) .......................................................................... 9

II. AGREGATS DE CARRIERE ...................................................................................................................................... 10


1) SABLE : 0/3 Densit : 1.4 T/ m3 .......................................................................................................................... 10
2) GRAVIER : 3/8 Densit : 1.3 T/ m3...................................................................................................................... 10
3) GRAVIER : 8/15 Densit : 1.3 T/ m3 ................................................................................................................... 11
4) GRAVIER : 15/25 Densit : 1.3 T/ m3 ................................................................................................................. 11

III.

SABLE DE MER: ................................................................................................................................................... 12

IV. LES LIANTS .............................................................................................................................................................. 13


1) CIMENT ...................................................................................................................................................................................... 13
2) CIMENT BLANC: ..................................................................................................................................................................... 13
3) PLATRE: 40 kg/sac ............................................................................................................................................................ 14

V.

LES PRODUITS ROUGES ......................................................................................................................................... 15

1) BRIQUE CREUSE 4 T (5 x 20 x 30) .......................................................................................................................... 15


2) BRIQUE CREUSE 8 T (10 x 20 x 30) ........................................................................................................................ 15
3) BRIQUE CREUSE 9 T (10 x 10 x 20) ........................................................................................................................ 16
4) BRIQUE CREUSE 12 T (15 x 20 x 30)...................................................................................................................... 16
5) BRIQUE PLEINE (5 x 10 x 20) .................................................................................................................................... 17
6) BRIQUE REFRACTAIRE : ..................................................................................................................................................... 17
7) VERRE CERAMIQUE OU BRIQUE NEVADA (0,20 x 0,20 x 0,08) ...................................................................... 18

VI. LES PRODUITS EN BETON : ............................................................................................................................... 19


1)- HOURDI (0.16 x0.52 x0.20) poids: 13 Kg/U .................................................................................................. 19
2)- HOURDI (0.20 x0.52 x0.20) poids: 18 Kg/U .................................................................................................. 19
3) - PARPAINGS (0.40 x 0.20 x 0.10) poids: 10 Kg/U .................................................................................... 20
4) - PARPAINGS (0.40 x 0.20 x 0.15) poids: 15 Kg/U .................................................................................... 20
5)- PARPAINGS (0.40 x 0.20 x 0.200), poids: 20 Kg/U .................................................................................. 21
6)- BORDURE DE TROTTOIR

(0.50 x 0.30 x 0.15) 2 U/ml ............................................................................... 21

7)- CLAUSTRA

VII.

(40 x 40) .................................................................................................................................................. 22

LES ACIERS : ...................................................................................................................................................... 23

1)-

6 lisse .......................................................................................................................................................................... 23

2)-

8:(lisse) ..................................................................................................................................................................... 23

3)-

6 T: ................................................................................................................................................................................. 23

4)-

5)-

10 T: ............................................................................................................................................................................... 24

6)-

12 T: ............................................................................................................................................................................... 24

7)-

14 T: ............................................................................................................................................................................... 25

8)-

16 T: ............................................................................................................................................................................... 25

9)-

20 T: ............................................................................................................................................................................... 25

8 T: ............................................................................................................................................................................... 24

10)- TREILLIS SOUDE (15 x 15): 247 kg/U .............................................................................................................. 26


11)- TREILLIS SOUDE (20 x 20): 185 kg/U .............................................................................................................. 26
12)- FIL D'ATTACHE: .............................................................................................................................................................. 26
13)- POINTE: ............................................................................................................................................................................... 27

VIII.

BOIS DE COFFRAGE: ...................................................................................................................................... 28

IX. REVETEMENTS:.......................................................................................................................................................... 29
1) CARREAU GRANITO (20 x 20) ......................................................................................................................................... 29
2) CARREAU GRANITO (25 x 25) ......................................................................................................................................... 29
3) - PLINTHE (0, 10 x 0, 20) poids: 0.250Kg/U 5U/ml .................................................................................. 30
4)- FAIENCE:( 0,15 x 0,15) 0,250 kg/U ................................................................................................................... 30
5) MARCHE ET CONTRE MARCHE D'ESCALIER ................................................................................................................... 31

X.

PRODUITS D'ETANCHEITE : ............................................................................................................................... 32

1) LIEGE : Plaque de (1,00 x 0,50 x 0,04) .......................................................................................................... 32


2) POLYANE: (70 KG/ROULEAU) densit

0,090 kg/m ......................................................................................... 32

3) POLYSTIRENE: plaque de (2,00 x 1,00 x 0,04) masse volumique 25 kg/m3 .................................. 33


4) PAPIER KRAFT densit

0,100 kg/m...................................................................................................................... 33

5) FEUTRE : 18 m/ rouleau.............................................................................................................................................. 34
6) PAXALUMIN : 9 m/ rouleau ......................................................................................................................................... 35
7) E.I.F:(enduit par application froid ou flinkot) ............................................................................... 35
8) E.A.C:(enduit par application chaud) ft de 200 Kg/U ou sac de 50 Kg/U consommation
1.5 Kg/m......................................................................................................................................................................................... 36

XI. ASSAINISSEMENT : ................................................................................................................................................ 38


1) - BUSE 100 ep: 25 mm, poids: 21 kg/U .......................................................................................................... 38
2)- BUSE 150 ep:25 mm poids: 29Kg/U ................................................................................................................... 38

3)- BUSE 200 ep:28 mm poids:42Kg/U...................................................................................................................... 39


4) - BUSE 300 ep: 30 mm, pids: 64 Kg/U ............................................................................................................ 39
5) - BUSE 400 ep: 35 mm, poids: 78Kg/U ............................................................................................................ 40
6) - BUSE 500 ep: 40 mm, poids: 143Kg/U .......................................................................................................... 40
7) - BUSE 600 ep: 60 mm, poids: 244 Kg/u ....................................................................................................... 41
8) - BUSE 800 ep:80 mm, poids: 550 Kg/U .......................................................................................................... 41
9) - BUSE 1000 ep:80 mm, poids: 820 Kg/U ....................................................................................................... 42
10)- BUSE 1200 ep: 80 mm, poids: .......................................................................................................................... 42
11)- TAMPON EN FONTE (850 x 850) 325 kg/U .......................................................................................................... 43
12)- GRILLE AVALOIR (400 x 400)

XII.

28 kg/U .......................................................................................................... 43

PLOMBERIE SANITAIRE: ................................................................................................................................... 44

1)- BAIGNOIRE: .......................................................................................................................................................................... 44


2)- RECEVEUR DE DOUCHE: ..................................................................................................................................................... 44
3)- LAVABO: ................................................................................................................................................................................. 45
4)- LAVE-MAINS: ........................................................................................................................................................................ 45
5)- EVIER DE CUISINE ............................................................................................................................................................ 46
6)- SIEGE A LA TURQUE: ....................................................................................................................................................... 46
7)- CHASSE D'EAU: ................................................................................................................................................................... 47
8)- CHAUFFE EAU: ..................................................................................................................................................................... 47
9)- Canalisations galvanises: .................................................................................................................................... 48
10)- Canalisations cuivre:.............................................................................................................................................. 49
11)- Canalisations PVC: ..................................................................................................................................................... 49

XIII.

PEINTURE: ......................................................................................................................................................... 50

1)- CHAUX: (sac de 25 kg) ................................................................................................................................................ 50


2)- ENDUIT DE PEINTURE AU VINYL (EN POUDRE : sac de 25 kg) ................................................................. 50
3)- PEINTURE VINYLIQUE "BLANROC-SUPER "

(bidon 25 kg)........................................................................... 51

4)- LAQUE OLEOGLYCEROPHTALIQUE " MATE " .............................................................................................................. 51


5)- LAQUE GLYCEROPHTALIQUE " MATE " ........................................................................................................................ 52
6)- LAQUE GLYCEROPHTALIQUE " SATINEE " ................................................................................................................. 52
7)- LAQUE GLYCEROPHTALIQUE " SUPER BRILLANTE " .............................................................................................. 53
8)- PEINTURE A L'HUILE " SUPER ATLAS " bidon 30kg....................................................................................... 53
9)- PEINTURE ANTI ROUILLE PRIMAPLOMB " bidon 30kg....................................................................................... 54

XIV.

VITRERIE : ........................................................................................................................................................... 55

1)- VERRE DEMI DOUBLE : ep 3 cm


2)- VERRE DOUBLE : ep 4 mm

densit 8,125 kg/m ............................................................................... 55

densit 13,100 kg/m ......................................................................................... 55

3)- VERRE MARTELE : .............................................................................................................................................................. 56


4)- MASTIC:

bidon 30kg

type (maxolin hl) ..................................................................................................... 56

AVANT-PROPOS
Le prix
des matriaux
rendus chantier
s'obtient
en ajoutant leurs prix
d'achat en hors taxes
les frais lis au transport,
la manutention et aux
pertes ou casses ventuelles en cours de transport.
Ces frais varient, car les cots du transport et de la manutention sont fonction
de l'loignement des points de vente, du poids et du volume des marchandises
transporter, de l'effectif des quipes de manutention et du temps qui leur est
ncessaire pour charger et dcharger les produits ou matires Approvisionns.
Dans cette tude, les hypothses poses en vue de la dtermination des frais se
rapportant aux articles relevant des lots: tanchit, assainissement, plomberiesanitaire, peinture et vitrerie sont prises titre d'illustration.
Ainsi, les moyens de transport sont choisis de faon correspondre au poids ou
au volume des marchandises censes tre transportes. La dsignation des quipes
de manutention et le temps ncessaire leurs interventions sont arrts suivant
les Quantits de matriaux relatives chaque chargement.
Afin que le prix des matriaux
rendus chantier
soit bien cern lors de
l'tablissement des devis, les frais qui seront induits par les moyens mettre
en uvre pour assurer l'approvisionnement
devront tre
calcules selon les
Quantits de produits ou matires spcifiques a chaque cahier des charges.

I.

AGREGATS DE RIVIERE

Nota:
A l'exception du T.V.O. dont l'approvisionnement peut se faire comme il est
propos ci-dessous, nous considrons pour les autres agrgats qu'une distance de
50 km spare le chantier des points de vente et qu'un camion peut effectuer deux
voyages par jour. Cependant, pour le sable 0/3, la production est si faible qu'on
ne peut en gnral se faire livrer auprs d'une mme sablire plus d'un chargement
de camion par jour.

1. T.V.O
- P.A.H.T

DA/M3

Location /jour
- Chargement: --------------------------------= ---------Quantit x nombre camions x nombre voyages
5 x 5 x 4

DA/M3

(Pelle hydraulique chargeant pour une flotte de 05 camions 10 T. transportant


05m3/voyage et faisant 04 rotations sur un trajet de 50 Km aller-retour.)
Location /jour
- Transport: -----------------------= ----------Quantit x nombre voyages /jour
5 x 4
S/Total

DA / m3

DA / m3

DA / m3

- Perte au transport et au stockage: 3 %

Total

DA / m3

2. SABLE : 0/3
- P.A.H.T
Location /jour
- Transport: -----------------------Quantit x nombre voyages /jour

DA / m3
= ----------1 x 6 m3

---------------

DA/m3
---------------

(Camion 10 T.)
S/Total

- Perte au transport et au stockage: 5 %

---------------

DA/m3
---------------
---------------

DA/m3
---------------

Total

---------------

DA/m3
---------------

3) GRAVIER : 3/8
- P.A.H.T
Location /jour
- Transport: -----------------------=
Quantit x nombre voyages /jour

----------2 x 6 m3

---------------

DA/m3
---------------
---------------

DA/M3
---------------

(Camion 10 T.)
S/Total

- Perte au transport et au stockage: 3 %


Total

---------------

DA/m3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------

4) GRAVIER : 8/15
---------------

DA/M3
---------------

- P.A.H.T
Location /jour
- Transport: -----------------------=
Quantit x nombre voyages /jour

-----------
6 m3 x 2

---------------

DA/M3
---------------

(Camion 10 T.)
S/Total
- Perte au transport et au stockage: 3 %
Total

---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------

5) GRAVIER : 15/25
---------------

DA/M3
---------------

- P.A.H.T
Location /jour
- Transport: -----------------------=
Quantit x nombre voyages /jour

----------6 m3 x 2

---------------

DA/M3
---------------

(Camion 10 T.)
S/Total
- Perte au transport et au stockage: 3 %
Total

---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------

6) MOELLON ORDINAIRE : (Pierre sche de sablire 40/60)


- P.A.H.T
Location /jour
- Transport: -----------------------Quantit x nombre voyages /jour
(Camion 10 T.)

= ----------2 x 5 m3
Total

---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------

II.

AGREGATS DE CARRIERE

Nota:
Comme pour les agrgats de rivire, nous considrons qu'une distance de 50 Km
spare le chantier des points de vente et qu'un camion peut effectuer deux voyages
par jour.

1) SABLE : 0/3 Densit : 1.4 T/ m3


- P.A.H.T
Location /jour
- Transport: -----------------------=
Quantit x nombre voyages /jour
(Camion 10 T.)

----------2 x 10 T
S/Total

- Perte au transport et au stockage: 5 %


Total
- Prix au m3: prix la tonne

densit =

x 1.4

---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/M3
---------------

2) GRAVIER : 3/8 Densit : 1.3 T/ m3


- P.A.H.T
Location /jour
- Transport: -----------------------= ----------Quantit x nombre voyages /jour
2 x 10 T
(Camion 10 T.)
S/Total
- Perte au transport et au stockage: 3 %
Total
- Prix au m3: prix la tonne

densit =

x 1.3

---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/M3
---------------

3) GRAVIER : 8/15 Densit : 1.3 T/ m3


- P.A.H.T
Location /jour
- Transport: -----------------------= ----------Quantit x nombre voyages /jour
2 x 10 T
(Camion 10 T.)
S/Total
- Perte au transport et au stockage: 3 %
Total
- Prix au m3: prix la tonne

densit =

x 1.3

---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/M3
---------------

4) GRAVIER : 15/25 Densit : 1.3 T/ m3


- P.A.H.T
Location /jour
- Transport: -----------------------= ----------Quantit x nombre voyages /jour
2 x 10 T
(Camion 10 T.)
S/Total
- Perte au transport et au stockage: 3 %
Total
- Prix au m3: prix la tonne

densit =

x 1.3

---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/M3
---------------

III.

SABLE DE MER:

Nota:
Il rentre dans la composition des btons et mortiers au mme titre que Le sable
0/3 de rivire ou de carrire. Pour des raisons conomiques son approvisionnement
est exclu pour les rgions trop loignes de la cote.
S'agissant de celles qui y sont proches, le nombre de voyages par jour qu'un
camion peut effectuer dpendra de la distance existant entre le
chantier et les
points de vente. Dans cette tude, il est retenu un voyage par jour.
--------------

DA/M3
---------------

- P.A.H.T
Location /jour
- Transport: -----------------------Quantit x nombre voyages /jour
(Camion 10 T.)

= ---------1 x 6 m3
S/Total

---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------

- Perte au transport et au stockage: 5 %

Total

---------------

DA/M3
---------------

IV.

LES LIANTS

Nota:
Le chargement des liants (ciments et pltre) s'effectue gnralement la charge
des fournisseurs. Le dchargement et rangement se donnent la tche pour 04
manuvres pour une dure de 04 heures / camion de 10 T.

1) CIMENT
- CPA 325 P.A.H.T
- Chargement:
- Transport:

Location /jour
-----------------------Quantit

----------10 T

---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------

(camion 10 T.)
- Dchargement et rangement:

4 MO x 4h x
---------------- =
10 T
S/Total

- Perte au transport et au stockage: 3 %


Total

---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------

2) CIMENT BLANC:
- P.A.H.T
- Chargement:
Location /jour
- Transport: -----------------------Quantit
(Camion 10 T.)
- Dchargement et rangement:

----------10 T

4 MO x 4h x
-----------------10 T
S/Total

- Perte au transport et au stockage: 3 %

---------------

DA/T
---------------
---------------

DA/T
---------------
---------------
=
DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------

Total

---------------

DA/T
---------------

3) PLATRE: 40 kg/sac
---------------

DA/T
---------------
---------------

DA/T
---------------

- P.A.H.T.
- Chargement:

---------- x 1000
40 kg

Location /jour
- Transport: -----------------------Quantit
(Camion 10 T.)
- Dchargement et rangement:

----------10 T

4 MO x 4h x
-----------------10 T
S/Total

- Perte au transport et au stockage: 3 %


Total

---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------
---------------

DA/T
---------------

V.

LES PRODUITS ROUGES

Nota:
Le chargement des produits rouges s'effectue a la charge de l'entreprise a raison
de........DA/chargement d'un camion de 10T. Le dchargement et rangement se
donnent la tache pour 04 manuvres pour une dure de 04 heures.

1) BRIQUE CREUSE 4 T (5 x 20 x 30)


---------------

DA/U
---------------

- P.A.H.T.

- Chargement:

---------------

DA/U
---------------

---------4000 U

Location /jour
- Transport: -----------------------(Camion 10T)
Quantit
- Dchargement et rangement:

- Perte ou casse au transport

----------4000 U

---------------

DA/U
---------------

4 MO x 4h x
-----------------4000 U

---------------

DA/U
---------------

S/Total

---------------

DA/U
---------------

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------

2) BRIQUE CREUSE 8 T (10 x 20 x 30)


---------------

DA/U
---------------

- P.A.H.T.

- Chargement:

- Transport:
(camion 10T)

---------------

DA/U
---------------

---------2000 U
Location /jour
-----------------------Quantit

- Dchargement et rangement:

----------2000 U

---------------

DA/U
---------------

4 MO x 4h x
-----------------2000 U

---------------

DA/U
---------------

S/Total
- Perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

3) BRIQUE CREUSE 9 T (10 x 10 x 20)


---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

---------4000 U

Location /jour
- Transport: -----------------------(Camion 10T)
Quantit
- Dchargement et rangement:

= ---------------4000 U

4 MO x 4h x
-----------------------4000 U
S/Total

- Perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

4) BRIQUE CREUSE 12 T (15 x 20 x 30)


---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

---------1500 U

Location /jour
- Transport: -----------------------(Camion 10T)
Quantit
- Dchargement et rangement:

----------1500 U
4 MO x 4h x
-----------------1500 U

---------------

DA/U
---------------
---------------

DA/U
---------------

S/Total
- Perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

5) BRIQUE PLEINE (5 x 10 x 20)


---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

---------5000 U

Location /jour
- Transport: -----------------------(Camion 10T)
Quantit

----------5000 U
4 MO x 4h x
-----------------5000 U

- Dchargement et rangement:

S/Total
- Perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

6) BRIQUE REFRACTAIRE :
---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

---------5000 U

Location /jour
- Transport: -----------------------(Camion 10T)
Quantit

- Dchargement et rangement:

4 MO x 4h x
-----------------5000 U

----------5000 U

---------------

DA/U
---------------
---------------

DA/U
---------------

S/Total
- Perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

7) VERRE CERAMIQUE OU BRIQUE NEVADA (0,20 x 0,20 x 0,08)


---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

---------U

Camionnette
- Transport: -----------------------Quantit

x 100 km
-------------U

---------------

DA/U
---------------

(DA/km pour un trajet de 100 km aller et retour)


- Dchargement et rangement:

MO x
x
------------------------U
S/Total

- Perte ou casse au transport

: 3 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

Nota:
La Quantit de briques "Nevada" varie d'une architecture l'autre. Le moyen de
transport ainsi que la main d'uvre pour la manutention et
la dure de son
intervention seront choisis en fonction des Quantits approvisionner.

VI.

LES PRODUITS EN BETON :

Nota:
Le chargement des produits en bton s'effectue la charge de l'entreprise a
raison de ........ DA/chargement d'un camion 10T.

1)- HOURDI (0.16 x0.52 x0.20) poids: 13 Kg/U


- P.A.H.T.
- Chargement:

--------------800 U
Location /jour
- Transport: -----------------------=
Quantit

----------800 U

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

Camion 10 T
- Dchargement et rangement:

3 MO x 2 h x
------------------------800 U
S/Total

- Majoration pour casse au transport et au stockage : 5 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

2)- HOURDI (0.20 x0.52 x0.20) poids: 18 Kg/U


---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

--------------500 U

Location /jour
- Transport: -----------------------Quantit

----------500 U

---------------

DA/U
---------------

Camion 10 T
- Dchargement et rangement:

3 MO x 2 h x
------------------------500 U
S/Total

---------------

DA/U
---------------
---------------

DA/U
---------------

- Majoration pour casse au transport et au stockage : 5 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------

3) - PARPAINGS (0.40 x 0.20 x 0.10) poids: 10 Kg/U


---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

--------------1000 U

Location /jour
- Transport: -----------------------Quantit

----------1000 U

---------------

DA/U
---------------

Camion 10 T
- Dchargement et rangement:

3 MO x 2 h x
------------------------1000 U
S/Total

- Majoration pour casse au transport et au stockage : 5 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

4) - PARPAINGS (0.40 x 0.20 x 0.15) poids: 15 Kg/U


---------------

DA/U
---------------

- P.A.H.T.

- Chargement:

---------------

DA/U
---------------

--------------700 U

Location /jour
- Transport: -----------------------Quantit

----------700 U

---------------

DA/U
---------------

Camion 10 T
- Dchargement et rangement:

3 MO x 2 h x
------------------------700 U

---------------

DA/U
---------------

S/Total
- Majoration pour casse au transport et au stockage : 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

5)- PARPAINGS (0.40 x 0.20 x 0.200), poids: 20 Kg/U


---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

--------------500 U

Location /jour
- Transport: -----------------------Quantit

----------500 U

---------------

DA/U
---------------

Camion 10 T
- Dchargement et rangement:

3 MO x 2 h x
------------------------500 U
S/Total

- Majoration pour casse au transport et au stockage : 5 %

Total

6)- BORDURE DE TROTTOIR


- P.A.H.T.
- Chargement:

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

(0.50 x 0.30 x 0.15) 2 U/ml


---------------

DA/ml
---------------
---------------

DA/ml
---------------

2 x
--------------100 ml

(100ml = 200 U)
Location /jour
- Transport: -----------------------(Camion 10T)
Quantit

----------100 ml

---------------

DA/ml
---------------

- Dchargement et rangement:

4 MO x 2 h x
------------------------100 ml
S/Total

- perte ou casse au transport et au stockage : 5 %


Total

7)- CLAUSTRA

(40 x 40)
---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

---------------

DA/ml
---------------
---------------

DA/ml
---------------
---------------

DA/ml
---------------
---------------

DA/ml
---------------

--------------U

Location /jour
- Transport: -----------------------Quantit
Camion 5 T
- Dchargement et rangement:

----------U

MO x
x
------------------------U
S/Total

- Majoration pour casse au transport et au stockage : 5 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

Nota:
Les Quantits de claustras varient d'une architecture l'autre. Le moyen de
transport ainsi que la main d'uvre pour la manutention et son temps
d'intervention seront choisis en fonction des quantits a approvisionn.

VII.

LES ACIERS :

1)-

6 lisse

- P.A.H.T.

---------------

DA/KG
---------------

Location /jour
- Transport: -----------------------Quantit

---------------

DA/KG
---------------

----------10 000 kg

Camion 10 T
- Dchargement et rangement:

4 MO x 4 h x
------------------------10 000 kg
Total

2)-

---------------

DA/KG
---------------
---------------

DA/KG
---------------

8:(lisse)

- P.A.H.T.

---------------

DA/KG
---------------

Location /jour
- Transport: -----------------------Quantit

---------------

DA/KG
---------------

----------10 000 kg

Camion 10 T
- Dchargement et rangement:

4 MO x 4 h x
------------------------10 000 kg
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------

NOTA:
Le cot du dchargement des aciers 6 et 8 lisse livrs en couronnes est
ngligeable car il peut s'effectuer rapidement par simple basculement de la benne
du camion transporteur. Le chargement s'effectue la charge de l'entreprise
raison de ......... DA/q.

3)-

6 T:

- P.A.H.T.
Location /jour
- Transport: -----------------------Quantit
Camion 10 T

----------10 000 kg

---------------

DA/KG
---------------
---------------

DA/KG
---------------

- Dchargement et rangement:

4 MO x 4 h x
------------------------10 000 kg
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------

NOTA:
Le chargement des aciers s'effectue la charge de fournisseur. A dfaut d'engin,
le dchargement et le rangement au chantier se donnent la tche pour 04 MO pour
une dure de 04 h / camion 10T.

4)-

8 T:
---------------

DA/KG
---------------

- P.A.H.T.
Location /jour
- Transport: -----------------------Camion 10 T
Quantit
- Dchargement et rangement:

----------10 000 kg

4 MO x 4 h x
------------------------10 000 kg
Total

5)-

---------------

DA/KG
---------------
---------------

DA/KG
---------------

10 T:
---------------

DA/KG
---------------

- P.A.H.T.
Location /jour
- Transport: -----------------------Camion 10 T
Quantit
- Dchargement et rangement:

----------10 000 kg

4 MO x 4 h x
------------------------10 000 kg
Total

6)-

---------------

DA/KG
---------------

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

12 T:
---------------

DA/KG
---------------

- P.A.H.T.
Location /jour
- Transport: -----------------------Camion 10 T
Quantit

----------10 000 kg

---------------

DA/KG
---------------

- Dchargement et rangement:

4 MO x 4 h x
------------------------10 000 kg
Total

7)-

Location /jour
- Transport: -----------------------Camion 10 T
Quantit
- Dchargement et rangement:

----------10 000 kg

4 MO x 4 h x
------------------------10 000 kg
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

16 T:

- P.A.H.T.
Location /jour
- Transport: -----------------------=
----------Quantit
10 000 kg
Camion 10 T
4 MO x 4 h x
- Dchargement et rangement:
------------------------10 000 kg
Total

9)-

---------------

DA/KG
---------------

14 T:

- P.A.H.T.

8)-

---------------

DA/KG
---------------

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

20 T:

- P.A.H.T.
Location /jour
- Transport: -----------------------=
----------Quantit
10 000 kg
Camion 10 T
4 MO x 4 h x
- Dchargement et rangement:
------------------------10 000 kg
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

10)- TREILLIS SOUDE (15 x 15): 247 kg/U


- P.A.H.T.
Location /jour
- Transport: -----------------------Quantit

----------8 U x 247 kg

---------------

DA/KG
---------------
---------------

DA/KG
---------------

Camion 10 T
- Dchargement et rangement:

4 MO x 0 h 13 x
------------------------247 kg
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------

11)- TREILLIS SOUDE (20 x 20): 185 kg/U


- P.A.H.T.
Location /jour
- Transport: -----------------------Camion 10 T
Quantit
- Dchargement et rangement:

----------8 U x 185 kg

4 MO x 0 h 13 x
------------------------185 kg
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

12)- FIL D'ATTACHE:


- P.A.H.T.
- Chargement:

2 MO x 0h 08 x
----------------------100 kg

Camionnette
- Transport: -----------------------Quantit

x 50 km
--------------100 kg

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

(.....DA /km pour un trajet de 50 km aller et retour)


- Dchargement et rangement:

2 MO x 0 h 13 x
------------------------100 kg
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------

13)- POINTE:
- P.A.H.T.

---------------

DA/KG
---------------

- Chargement:

---------------

DA/KG
---------------

----------------------100 kg

(100 kg, 20 paquets de 5 kg)


Camionnette
- Transport: -----------------------Quantit
(.....DA /km pour un trajet de
- Dchargement et rangement:

x 50 km
--------------100 kg

---------------

DA/KG
---------------

50 km aller et retour)
2 MO x 0 h 25 x
------------------------100 kg
S/Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

Total

---------------

DA/KG
---------------

- perte au transport et au stockage : 5 %

VIII.

BOIS DE COFFRAGE:
---------------

DA/M3
---------------
---------------

DA/M3
---------------

- P.A.H.T.
- Chargement:

--------------6 m3

Location /jour
- Transport: -----------------------Quantit

----------6 m3

---------------

DA/M3
---------------

Camion 10 T
- Dchargement et rangement:

4 MO x 2 h x
------------------------6 m3
S/Total

- perte ou casse au transport : 0,3 %


Total

---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------

HUILE DE DECOFFRAGE
- P.A.H.T.
- Chargement:

----------------------100 l

Camionnette
- Transport: -----------------------Quantit

- Dchargement et rangement:

--------------100 l

1 MO x 0 h 15 x
------------------------100 l
S/Total

- perte au transport et au stockage : 1 %


Total

---------------

DA/L
---------------
---------------

DA/L
---------------
---------------

DA/L
---------------
---------------

DA/L
---------------
---------------

DA/L
---------------
---------------

DA/L
---------------
---------------

DA/L
---------------

IX.

REVETEMENTS:

1) CARREAU GRANITO (20 x 20)


- P.A.H.T.
- Chargement:

----------------------20 m

Location /jour
- Transport: -----------------------(Camion 10T)
Quantit
- Dchargement et rangement:

----------200 m

4 MO x 4 h x
------------------------200 m
S/Total

- perte ou casse au transport et au stockage : 5 %


Total

---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------

Nota:
Le chargement s'effectue la charge de l'entreprise
raison de ......
DA/Palette de 20 m. Le dchargement et le rangement se donnent la tche pour 04
manuvres pour une dure de 04 h/camion de 10T.

2) CARREAU GRANITO (25 x 25)


- P.A.H.T.
- Chargement:

----------------------20 m

Location /jour
- Transport: -----------------------(Camion 10T)
Quantit
- Dchargement et rangement:

----------200 m

4 MO x 4 h x
------------------------200 m
S/Total

---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------

- perte ou casse au transport et au stockage : 5 %


Total

---------------

DA/M
---------------
---------------

DA/M
---------------

3) - PLINTHE (0, 10 x 0, 20) poids: 0.250Kg/U 5U/ml


- P.A.H.T.
- Chargement:

----------------------2 000 ml

Location /jour
- Transport: ------------------------ =
(Camion 2.5T)
Quantit
- Dchargement et rangement:

-----------------2 000 ml

3 MO x 1h50 x
------------------------2 000 ml
S/Total

- perte au transport et au stockage : 5 %


Total

---------------

DA/Ml
---------------
---------------

DA/Ml
---------------
---------------

DA/Ml
---------------
---------------

DA/Ml
---------------
---------------

DA/Ml
---------------
---------------

DA/Ml
---------------
---------------

DA/Ml
---------------

Nota:
Nous considrons que la Quantit de plinthe approvisionner est de 200 m. Pour
ce faire, le moyen de transport appropri sera le camion 2,5 T. Le chargement
s'effectue gnralement la charge du fournisseur.

4)- FAIENCE:( 0,15 x 0,15) 0,250 kg/U


---------------

DA/M
---------------

- P.A.H.T.

- Chargement:

----------------------200 m

Location /jour
- Transport: -----------------------(camion 2,5T)
Quantit
- Dchargement et rangement:

---------------

DA/M
---------------

= -----------------200 m

---------------

DA/M
---------------

3 MO x 1h50 x
------------------------200 m

---------------

DA/M
---------------

S/Total
- perte au transport et au stockage : 5 %
Total

---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------

Nota:
Nous considrons aussi que la Quantit de faence approvisionner est de 200
m. En
ce qui concerne le moyen
de
transport
et le chargement de la
marchandise, ils seront identiques ceux de la plinthe.

5) MARCHE ET CONTRE MARCHE D'ESCALIER


(Une marche + une contre marche) = (1,25 x 0,32) + (1,25 x 0,14) = 0,58 m
- P.A.H.T.
- Chargement:

----------------------46 m

Location /jour
- Transport: ------------------------ =
(camion 2.5T)
Quantit
- Dchargement et rangement:

-----------------46 m

4 MO x 1 h 50 x
------------------------46 m
S/Total

- perte ou casse au transport et au stockage : 2 %


Total

---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------

Nota:
La cage d'escalier des btiments classiques de 10 logements (R+4) comporte en
gnral 18 marches et 18 contremarches par tage courant. Pour des raisons
techniques, les concepteurs crent au niveau de l'accs principal un premier
palier
compos de 5 7 marches. Le calcul pour un btiment terrasse non
accessible donne (4x18) +7=79 marches et contremarches.
La superficie moyenne d'une unit (marche + contremarche) tant de 0.58 m, la
Quantit approvisionner sera de: 0.58 m x 79 = 45.82 m soit 46 m/btiment.

X.

PRODUITS D'ETANCHEITE :

1) LIEGE : Plaque de (1,00 x 0,50 x 0,04)


---------------

DA/M3
---------------
---------------

DA/M3
---------------

- P.A.H.T.
- Chargement:

----------------------10 m3

Location /jour
- Transport: ------------------------ =
(camion 2.5T)
Quantit
- Dchargement et rangement:

-----------------10 m3

3 MO x 1 h 50 x
------------------------10 m3
S/Total

- perte au transport et au stockage : 5 %


Total
Nota:
La Quantit ncessaire pour une terrasse de 21 x 10 = 210
suit: 210 m x 0,04 = 8,4 m3 (0,04 m tant l'paisseur
Lors de l'approvisionnement cette Quantit sera arrondie a
Le volume d'une plaque de lige est de 1,00 m x 0,5 x
nombre de plaques approvisionner sera de : 10 m3
----- = 500 U
0.02

2) POLYANE: (70 KG/ROULEAU) densit

0,090 kg/m

- Transport:

----------------------70 kg
Camionnette
-----------------------Quantit

---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------

m est dtermine comme


de la plaque de lige).
10 m3.
0,04 = 0,02 m3 d'o le

- P.A.H.T.
- Chargement:

---------------

DA/M3
---------------

x 20
= -----------------70 kg

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

(.....DA /km pour un trajet de 20 km Aller et retour)


- Dchargement et rangement:

2 MO x 0 h 08 x
------------------------70 kg

---------------

DA/KG
---------------

S/Total
- perte au transport et au stockage : 3 %
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

3) POLYSTIRENE: plaque de (2,00 x 1,00 x 0,04) masse volumique 25 kg/m3


- P.A.H.T.
- Chargement:

----------------------10 m3

Location /jour
- Transport: ------------------------ =
(camion 2.5T)
Quantit
- Dchargement et rangement:

-----------------10 m3

3 MO x 1 h 50 x
------------------------10 m3
S/Total

- perte au transport et au stockage : 5 %


Total

---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------
---------------

DA/M3
---------------

Nota:
La Quantit ncessaire pour une terrasse de 21 x 10 = 210 m est dtermine comme
suit: 210 m x 0,04 = 8,4 m3
(0,04 m tant l'paisseur de la plaque de
polystyrne). Lors de l'approvisionnement cette Quantit sera arrondie a 10 m3. Le
volume d'une plaque de polystyrne est de 2,00 m x 1,00 x 0,04 = 0,08 m3 d'o le
nombre de plaques approvisionner sera de : 10 m3
----- = 125 U
0,08

4) PAPIER KRAFT densit

0,100 kg/m

- P.A.H.T.

---------------

DA/KG
---------------

- Chargement:

---------------

DA/KG
---------------

----------------------21 KG

- Transport: vhicule de liaison


- Dchargement et rangement:

-----------------21 KG
------------------------21 kg
S/Total

- perte au transport et au stockage : 3 %


Total
Nota:
La Quantit de papier ncessaire pour une terrasse de 21 x 10
210 m x 0,100 = 21 kg.

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
est de:

5) FEUTRE : 18 m/ rouleau
- P.A.H.T.
- Chargement:

x 52
----------------------52 rouleaux

Location /jour
- Transport: ------------------------ =
(Camion 2.5T)
Quantit
- Dchargement et rangement:

-----------------52 rouleaux

3 MO x 0 h 50 x
------------------------52 rouleaux
S/Total

- perte au transport et au stockage : 3 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

Nota:
La Quantit ncessaire pour une terrasse de 21 x 10 = 210 m est dtermine comme
suit:
1 couche de feutre pour l'cran par vapeur 210 :18 m = environ 12 rouleaux.
3 couches de feutre pour le complexe d'tanchit: 12 x 3 = 36 rouleaux;
soit: 36 + 12 = 48 rouleaux.

4 rouleaux de paxalumin sont ncessaires pour l'excution du relev d'tanchit


de la mme terrasse.
Il y a lieu de les faire transporter par le mme camion en mme temps que le
feutre car ils seront approvisionns partir des mmes points de vente. Le nombre
de rouleaux transporter sera de 52.
Le chargement s'effectue la charge de l'entreprise raison de :.....DA/rouleau.

6) PAXALUMIN : 9 m/ rouleau
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
(Voir nota ci-dessous)
- Transport:
(Voir nota ci-dessous)
- Dchargement et rangement:
(Voir nota ci-dessous)
S/Total
- perte au transport et au stockage : 3 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

Nota:
La Quantit ncessaire pour une terrasse de 21 x 10 = 210 m est dtermine comme
suit:
On considre un relev constitu d'une bande de 0,50 m de largeur.
La superficie couvrir en paxalumin sera de: ((21 + 10) x 2) x 0,50 = 31 m
La superficie d'un rouleau tant de 9 m, d'o 31 : 9 = 3,44 environ 4 rouleaux.
Pour le chargement dchargement et transport prendre les mmes prix que ceux du
rouleau de feutre.

7) E.I.F:(enduit par application froid ou flinkot)


(Fut 200kg/U ou bidon 50 kg/U) consommation 300gr/m)
- P.A.H.T.
- Chargement:
(Voir nota ci-dessous)
- Transport:
(Voir nota ci-dessous)

2x
----------------100 kg
2x
---------------100 kg

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

2x
--------------100 kg

- Dchargement et rangement:

---------------

DA/KG
---------------

(Voir nota ci-dessous)


S/Total
-Perte au transport et au stockage: 3%
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

Nota:
La Quantit ncessaire pour une terrasse de 21 x 10 = 210 m est dtermine comme
suit:
1 couche pour l'cran par vapeur 0,3 kg x 210 = 63 kg
1 couche pour le relev d'tanchit: 0,3 kg x 0,50 x 62 = 9,30 kg
La Quantit totale sera de 72,30 kg soit 2 bidons de 50 kg/U ou 100 kg.
Il y a lieu de les faire transporter par le mme camion en mme temps que le
feutre et le Paxalumin car ils seront approvisionns partir des mmes points de
vente.
Pour le chargement dchargement et transport prendre les mmes prix que ceux du
rouleau de feutre.

8) E.A.C:(enduit par application chaud) ft de 200 Kg/U ou sac de 50 Kg/U


consommation 1.5 Kg/m
---------------

DA/KG
---------------

- P.A.H.T.

- Chargement:
location/j
- Transport: -----------Camion 2.5 T
Quantit

x 15
----------------1500 kg

---------------

DA/KG
---------------

= ---------------1500 kg

---------------

DA/KG
---------------

Point de vente ARZEW ou SKIKDA)


- Dchargement et rangement:
1500 kg=30 sacs x 50kg/U

3MO x 0h50 x
------------------1500 kg
S/Total

-Perte au transport et au stockage: 3%

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

Total

---------------

DA/KG
---------------

Nota:
La Quantit ncessaire pour une terrasse de 21 x 10 = 210 m est dtermine comme
suit:
1 couche pour l'cran par vapeur 1,5 kg x 210 = 315 kg
3 couches pour le complexe d'tanchit: 1,5 kg x 3 x 210 = 945 kg
1 couche pour le relev d'tanchit: 1,5 kg x 0,50 x 62 = 46,5 kg
La Quantit totale sera de 1306,5 kg soit 1500 kg pour tenir compte d'une
majoration pour perte.
Le chargement s'effectue par SONATRACH a raison de ......DA/quintal.

XI.

ASSAINISSEMENT :

Nota:
Pour minimiser la casse au transport, les buses en ciment comprim de 100 600
doivent tre transportes en position verticale. Au del de 600, elles peuvent
tre transportes en position horizontale car tant armes le risque susmentionn
se trouve a priori cart. De 100 300 Le chargement s'effectue gnralement
la charge de l'entreprise raison de ........DA/ chargement d'un camion 10T.
A partir de 400 il est assur par chariot lvateur la charge du fournisseur.
Le dchargement se confie aux agents de l'entreprise dont le renforcement par un
engin
de
chantier (pelle hydraulique) devient ncessaire
pour les buses de
diamtre suprieur 300.

1) - BUSE 100 ep: 25 mm, poids: 21 kg/U

----------------450 U

---------------

DA/U
---------------
---------------

DA/U
---------------

---------------450 U

---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
location/j
- Transport: -----------(Camion 10T)
Quantit

- Dchargement et rangement:

4MO x 2h x
------------------450 U
S/Total

- perte ou casse au transport et au stockage : 5 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

2)- BUSE 150 ep:25 mm poids: 29Kg/U


- P.A.H.T.

DA/U
---------------

- Chargement:

----------------242 U

---------------

DA/U
---------------

---------------242 U

---------------

DA/U
---------------

location/j
- Transport: -----------(Camion 10T)
Quantit

- Dchargement et rangement:

4MO x 2h x
------------------242 U
S/Total

- perte ou casse au transport et au stockage : 5 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

3)- BUSE 200 ep:28 mm poids:42Kg/U


---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
location/j
- Transport: ------------ =
(Camion 10T)
Quantit
- Dchargement et rangement:

----------------136 U
---------------136 U
4MO x 2h x
------------------136 U
S/Total

- perte ou casse au transport et au stockage : 5 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

4) - BUSE 300 ep: 30 mm, pids: 64 Kg/U

----------------72 U

---------------

DA/U
---------------
---------------

DA/U
---------------

---------------72 U

---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
location/j
- Transport: ------------ =
(camion 10T)
Quantit
- Dchargement et rangement:

4MO x 1h50 x
------------------72 U

---------------

DA/U
---------------

S/Total
- perte ou casse au transport et au stockage : 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

5) - BUSE 400 ep: 35 mm, poids: 78Kg/U

----------------36 U

---------------

DA/U
---------------
---------------

DA/U
---------------

location/j
- Transport: -----------= ---------------(camion 10T
Quantit
36 U

---------------

DA/U
---------------

- P.A.H.T.
- Chargement:

- Dchargement et rangement:
(Engin 1 h + 3 MO x 1 h)

+ 3MO x 1h00 x
-------------------
36 U
S/Total

- perte ou casse au transport et au stockage : 5 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

6) - BUSE 500 ep: 40 mm, poids: 143Kg/U


---------------

DA/U
---------------

- P.A.H.T.

----------------21 U

---------------

DA/U
---------------

location/j
- Transport: -----------= ---------------Camion 10T)
Quantit
21 U

---------------

DA/U
---------------

- Chargement:
(clark)

- Dchargement et rangement:
(Engin /1h + 3 MO x 1 h)

+ 3MO x 1h x
-----------------------21 U

---------------

DA/U
---------------

S/Total
- perte ou casse au transport et au stockage : 3 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

7) - BUSE 600 ep: 60 mm, poids: 244 Kg/u


---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
(clark)
location/j
- Transport: ------------ =
(camion 10T)
Quantit
- Dchargement et rangement:
(Engin /1h + 3 MO x 1 h)

----------------18 U
---------------18 U
+ 3MO x 1h x
-----------------------18 U
S/Total

- perte ou casse au transport et au stockage : 3 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

8) - BUSE 800 ep:80 mm, poids: 550 Kg/U


---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
(clark)

----------------14 U

location/j
- Transport: -----------= ---------------(Camion 10T)
Quantit
14 U
- Dchargement et rangement:
(Engin /1h + 3 MO x 1 h)

+ 3MO x 1h x
-----------------------14 U
S/Total

---------------

DA/U
---------------
---------------

DA/U
---------------

- perte ou casse au transport et au stockage : 3 %

Total

---------------

DA/U
---------------
---------------

DA/U
---------------

9) - BUSE 1000 ep: 80 mm, poids: 820 Kg/U

----------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------

---------------10 U

---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
(clark)
location/j
- Transport: ------------ =
(Camion 10T)
Quantit
- Dchargement et rangement:
(Engin /1h + 3 MO x 1 h)

+ 3MO x 1h x
-----------------------10 U
S/Total

- perte ou casse au transport et au stockage : 3 %


Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

10)- BUSE 1200 p.: 80 mm, poids:


---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
(clark)

----------------10 U

location/j
- Transport: -----------= ---------------(Camion 10T)
Quantit
10 U
- Dchargement et rangement:
(Engin /1h + 3 MO x 1 h)

+ 3MO x 1h x
-----------------------10 U
S/Total

- perte ou casse au transport et au stockage : 3 %

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

Total

---------------

DA/U
---------------

11)- TAMPON EN FONTE (850 x 850) 325 kg/U

----------------30 U

---------------

DA/U
---------------
---------------

DA/U
---------------

---------------30 U

---------------

DA/U
---------------

- P.A.H.T.
- Chargement:
(clark)
location/j
- Transport: ------------ =
(Camion 10 T)
Quantit
- Dchargement et rangement:
(clark: location minimum

+ 3 MO x 1h x
-----------------------30 U

Exige: 02 h).
Total

12)- GRILLE AVALOIR (400 x 400)

---------------

DA/U
---------------
---------------

DA/U
---------------

28 kg/U

- Chargement:
(Clark)

----------------100 U

---------------

DA/U
---------------
---------------

DA/U
---------------

location/j
- Transport: -----------(Camion 5 T)
Quantit

=---------------100 U

---------------

DA/U
---------------

- P.A.H.T.

- Dchargement et rangement:

4 MO x 2h x
-----------------------100 U
Total

---------------

DA/U
---------------
---------------

DA/U
---------------

XII.

PLOMBERIE SANITAIRE:

NOTA :
On considre que l'approvisionnement s'effectue pour quiper un btiment de 10
logements. Cette
hypothse
sera
retenue
pour
l'ensemble
des quipements
sanitaires. Le transport sera assur par camionnette de charge utile 10 Quintaux.
Le chargement s'effectue la charge de l'entreprise raison de....DA/chargement.

1)- BAIGNOIRE:
- P.A.H.T.
- Chargement:

----------------------10 U

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------10 U
Total

---------------

DA/U
---------------
---------------

DA/U
---------------

2)- RECEVEUR DE DOUCHE:


- P.A.H.T.
- Chargement:

----------------------10 U

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------10 U
S/Total

- perte ou casse au transport

: 5 %

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

Total

---------------

DA/U
---------------

3)- LAVABO:
- P.A.H.T.
- Chargement:

----------------------10 U

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------10 U
S/Total

- perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

4)- LAVE-MAINS:
- P.A.H.T.
- Chargement:

----------------------10 U

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

(Voir nota ci-dessous)


- Dchargement et rangement:

2 MO x 0 h 25 x
------------------------10 U
S/Total

- perte ou casse au transport

: 5 %

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

Total

---------------

DA/U
---------------

NOTA:
Lorsque la Quantit approvisionner ne justifie pas le recours la location d'un
moyen de transport particulier, l'enlvement des lave-mains auprs du fournisseur
s'effectuera en mme temps que les lavabos par le mme vhicule. En raison de leur
poids et de leur volume rduit par rapport aux lavabos, les frais lis leur
transport pourront tre considrs ngligeables.

5)- EVIER DE CUISINE


- P.A.H.T.
- Chargement:

----------------------10 U

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------10 U
S/Total

- perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

6)- SIEGE A LA TURQUE:


---------------

DA/U
---------------

- P.A.H.T.

- Chargement:

----------------------10 U

Camionnette
- Transport: -----------------------Quantit
(.....DA /km pour un trajet de 100 km)

x 100 km
--------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------

- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------10 U
S/Total

- perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

7)- CHASSE D'EAU:


- P.A.H.T.
- Chargement:

----------------------10 U

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

(Voir nota ci-dessous)


- Dchargement et rangement:

2 MO x 0 h 25 x
------------------------10 U
S/Total

- perte ou casse au transport

: 5 %
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

NOTA:
Tout comme pour les lave-mains, l'enlvement des chasses d'eau auprs du
fournisseur s'effectuera en mme temps que les siges la turque par le mme
vhicule. Les frais lis leur transport pourront aussi pour les mmes critres
tre considrs ngligeables.

8)- CHAUFFE EAU:


- P.A.H.T.
- Chargement:

----------------------10 U

---------------

DA/U
---------------
---------------

DA/U
---------------

Camionnette
x 100 km
- Transport: -----------------------=
--------------Quantit
10 U
(Voir nota ci-dessous)
2 MO x 0 h 25 x
- Dchargement et rangement:
------------------------10 U
Total

---------------

DA/U
---------------
---------------

DA/U
---------------
---------------

DA/U
---------------

NOTA:
En ce qui concerne les chauffe-eau, leur enlvement auprs du fournisseur
s'effectuera selon les conditions analogues celles des lave-mains et des chasses
d'eau lors de l'approvisionnement des quipements sanitaires ou, par le vhicule
de liaison de l'entreprise. Les frais lis leur transport pourront dans les deux
cas tre considrs ngligeables.

9)- Canalisations galvanises:


Dsignation

Dpart
usine HT
DA/ml

Chargt +
Dchargt
DA/ml

Transport
DA/ml

15/21
20/27
26/34
33/42
40/49
50/60
66/76
80/90
100/101
102/114.3

Perte 2%
DA/ml

Total
DA/ml

Densit
KG/ml
1.34
1.67
2.50
3.25
3.67
5.17
6.00
7.34
9.00
10.84

NOTA/
Le chargement est la charge du fournisseur quand il s'agit d'"ANABIB".
Le dchargement de 10T de marchandise livre en fardeaux de poids moyen 2 T/U
s'effectue par clarck pour une dure de 2 heures raison de .......DA/h. A dfaut
de clarck, il peut tre confi la tche pour presque le mme prix 4 MO pour
une dure de 8 heures. Les cots du transport et du dchargement devront tenir
compte de Quantits relles approvisionner. L'application des formules suivantes
permet de les dterminer.
MO x temps dchargt. x taux horaire MO
- Dchargement = ----------------------------------------Quantit
x ml
- Transport

Location camion
= -------------------------Quantit
x ml

10)- Canalisations cuivre:


Dsignation

Dpart
usine HT
DA/ml

Chargt +
Dchargt
DA/ml

Transport
DA/ml

Perte 2%
DA/ml

Total
DA/ml

8/10
10/12
12/14
14/16
18/20
20/22
26/28
40/42
47/50

Densit
KG/ml
0.252
0.308
0.363
0.419
0.587
0.671
1.46
2.03

NOTA/
MO x temps chargt + dchargt. x taux horaire MO
- Chargt + Dchargt = ------------------------------------------------Quantit
x ml
- Transport

Location camion
= -------------------------Quantit
x ml

11)- Canalisations PVC:


Dsignation

Dpart
usine HT
DA/ml

Chargt +
Dchargt
DA/ml

Transport
DA/ml

Perte 2%
DA/ml

Total
DA/ml

Densit
KG/ml

30
40
60
80
90
100
110
NOTA/
MO x temps chargt + dchargt. x taux horaire MO
- Chargt + Dchargt = ------------------------------------------------Quantit
x ml
- Transport

Location camion
= -------------------------Quantit
x ml

XIII.

PEINTURE:

NOTA
Le moyen de transport retenu pour l'approvisionnement des produits de peinture est
la camionnette de charge utile de 10 quintaux. Le chargement s'effectue la
charge de l'entreprise raison de ..... DA/chargement quelque soit le produit.

1)- CHAUX: (sac de 25 kg)


- P.A.H.T.
- Chargement:

----------------------10 Quintaux

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------10 quintaux

---------------

DA/qt
---------------
---------------

DA/qt
---------------
---------------

DA/qt
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------10 quintaux
S/Total

- perte ou casse au transport

: 3 %
Total

---------------

DA/qt
---------------
---------------

DA/qt
---------------
---------------

DA/qt
---------------
---------------

DA/qt
---------------

2)- ENDUIT DE PEINTURE AU VINYL (EN POUDRE : sac de 25 kg)


- P.A.H.T.
- Chargement:

----------------------25 x 40

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------25 x 40

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------25 x 40

---------------

DA/KG
---------------

S/Total
- perte ou casse au transport

: 3 %
Total

3)- PEINTURE VINYLIQUE "BLANROC-SUPER "

(bidon 25 kg)

- P.A.H.T.
- Chargement:

----------------------25 x 40

Camionnette
- Transport: -----------------------Quantit

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

x 100 km
--------------25 x 40

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------25 x 40
S/Total

- perte ou casse au transport

: 2 %
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

4)- LAQUE OLEOGLYCEROPHTALIQUE " MATE "


*- DJURDURA (bidon 25 kg)
- P.A.H.T.

---------------

DA/KG
---------------

- Chargement:

---------------

DA/KG
---------------

----------------------25 x 40

Camionnette
- Transport: -----------------------Quantit
(.....DA /km pour un trajet de 100 km)

x 100 km
--------------25 x 40

---------------

DA/KG
---------------

- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------25 x 40
S/Total

- perte ou casse au transport

: 2 %
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

5)- LAQUE GLYCEROPHTALIQUE " MATE "


*- THIXOMAT (bidon 25 kg)
- P.A.H.T.
- Chargement:

----------------------25 x 40

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------25 x 40

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------25 x 40
S/Total

- perte ou casse au transport

: 2 %

Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

6)- LAQUE GLYCEROPHTALIQUE " SATINEE "


*- THIXATIN (bidon 25 kg)
---------------

DA/KG
---------------

- P.A.H.T.

- Chargement:

----------------------25 x 40

---------------

DA/KG
---------------

Camionnette
- Transport: -----------------------Quantit
(.....DA /km pour un trajet de 100 km)
- Dchargement et rangement:

x 100 km
--------------25 x 40

3 MO x 0 h 50 x
------------------------25 x 40
S/Total

- perte ou casse au transport

: 2 %
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

7)- LAQUE GLYCEROPHTALIQUE " SUPER BRILLANTE "


*- GLYLAC 2000 (bidon 20 kg)
- P.A.H.T.
- Chargement:

----------------------20 x 50

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------20 x 50

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------20 x 50
S/Total

- perte ou casse au transport

: 2 %
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

8)- PEINTURE A L'HUILE " SUPER ATLAS " bidon 30kg


- P.A.H.T.
- Chargement:

----------------------30 x 33

---------------

DA/KG
---------------
---------------

DA/KG
---------------

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------30 x 33

---------------

DA/KG
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------30 x 33
S/Total

- perte ou casse au transport

: 2 %
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

9)- PEINTURE ANTI ROUILLE PRIMAPLOMB " bidon 30kg


- P.A.H.T.
- Chargement:

----------------------30 x 33

Camionnette
- Transport: -----------------------Quantit

x 100 km
--------------30 x 33

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

(.....DA /km pour un trajet de 100 km)


- Dchargement et rangement:

3 MO x 0 h 50 x
------------------------30 x 33
S/Total

- perte ou casse au transport

: 2 %
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

XIV.

VITRERIE :

1)- VERRE DEMI DOUBLE : ep 3 cm

densit 8,125 kg/m

- P.A.H.T.
- Chargement:

----------------------120 m

Camionnette
- Transport: -----------------------Quantit

- Dchargement et rangement:

--------------120 m

3 MO x 1 h 00 x
------------------------120 M
S/Total

- perte ou casse au transport

: 5 %
Total

NOTA
La Quantit ncessaire
elle sera de 120 m et
casses au transport et
le verre sera command
dimensions de pose sur

---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------

pour un logement f4 est de 12 m environ. Pour 10 logements


psera 10x12mx8.125kgs/m = 975 kg. Pour viter de grosses
le recours aux transporteurs quips de moyens appropris,
pour tre livr en carreaux coups chez le fournisseur aux
chantier.

2)- VERRE DOUBLE : ep 4 mm

densit 13,100 kg/m

- P.A.H.T.
- Chargement:

---------------

DA/M
---------------
---------------

DA/M
---------------

----------------------M

Camionnette
- Transport: -----------------------Quantit

- Dchargement et rangement:

MO x
x
------------------------M
S/Total

---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------

- perte ou casse au transport

: 5 %
Total

---------------

DA/M
---------------
---------------

DA/M
---------------

NOTA
Mme suggestions que pour le verre demi double en ce qui concerne le mode de
livraison. le moyen de transport ainsi que la main d'oeuvre pour la manutention et
son
temps
d'intervention
seront
choisis
en
fonction
des
Quantits

approvisionner.

3)- VERRE MARTELE :


- P.A.H.T.
- Chargement:

----------------------M

Camionnette
- Transport: -----------------------Quantit

- Dchargement et rangement:

--------------M

MO x
x
------------------------M
S/Total

- perte ou casse au transport

: 5 %
Total

---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------
---------------

DA/M
---------------

NOTA
Mme suggestions que pour le verre demi double en ce qui concerne le mode de
livraison. Le moyen de transport ainsi que la main d'oeuvre pour la manutention et
son
temps
d'intervention
seront
choisis
en
fonction
des
Quantits

approvisionner.

4) - MASTIC:
- P.A.H.T.

bidon 30kg type (maxolin hl)


---------------

DA/KG
---------------

- Chargement:
(Voir nota ci-dessous)

----------------------30 kg

Camionnette
- Transport: -----------------------Quantit
(Voir nota ci-dessous)
- Dchargement et rangement:
(Voir nota ci-dessous)

--------------30 kg

------------------------30 kg
S/Total

- perte ou casse au transport

: 2 %
Total

---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------
---------------

DA/KG
---------------

NOTA
La consommation tant de 0,250kg/m de verre. La Quantit de verre demi-double
pour 10 logements est de 120 m environ d'o la Quantit de mastic ncessaire est:
0,25 kg x 120 = 30 kg soit un bidon. Il y a lieu de le faire transporter par la
mme camionnette en mme temps que les bidons de peinture car ils seront
approvisionnes a partir des mmes points de vente.
Pour le chargement, dchargement et transport prendre les mmes prix que ceux du
bidon de peinture.