A Subcomponent of the WHRC Project on Climate Policy for Development in Emerging Economies Sponsored by Hewlett Foundation Conducted by Energy Technology Innovation Policy and Institute of Engineering and Themophysics of China Prepared by Lifeng Zhao (ETIP) Oct. 12, 2007
Contents
Brief Introduction Data Collection Thermodynamic Performance Environmental Performance Economic Assessment Next Steps
2
Brief Introduction
Cost and performance differences among different technology options
Sub-critical PC, 600MW Sub-critical PC, 600MW+Flue gas desulfurization (FGD) Sub-critical PC, 600MW+FGD+ Flue gas denitrification Super Critical PC 600MW Super Critical PC 600MW+FGD Super Critical PC 600MW+FGD+ Flue gas denitrification USC PC, 600MW USC PC, 600MW+FGD USC PC, 600MW+FGD+ Flue gas denitrification CFB300MW IGCC200MW
What should we do
3
Data Collection
Data needed for calculation of performance
typical coal types steam parameters, steam consumption, and heat recovery system parameters of typical sub-critical, SC, and USC PC plants technical parameters of gas turbine combined cycle power generation system
Data Collection
Pathways to data collection
plant visits attendance at conferences technology vendor and manufacturer contacts interviews with experts
No. 1 2
Contents Fixed bed gasifier (equipment, construction engineering, and installation engineering)
Jilin Changshan Fertilizer Fluidized bed gasifier (equipment, construction (Group) Co., LTD. engineering, and installation engineering) Entrained-bed gasifier (new coal-water slurry with opposed multi-nozzles gasifier), sysgas cleanup unit (equipment, construction engineering, and installation engineering) Entrained-bed gasifier, including GE, Shell, and new coalwater slurry with opposed multi-nozzles gasifier ShanxGaisifier manufacturei Luan Group Air Separation Unit (equipment, construction engineering, and installation engineering) Air Separation Unit (equipment, construction engineering, and installation engineering)China Huadian Corporation 6B and 9E gas turbines, HRSG , steam turbine, auxiliary system, Control system, electric system, water treatment system, water supply system, fuel supply system, 6 thermodynamic system
Yankuang Group
East China University of Science and Technology Sichuan Bluestar Machinery Co., Ltd Air Products and Chemicals (China) Air Liquide (Hangzhou) LTD., CO. Test and demoNanjing Turbine & Electric Machinery (Group) Co., LTD.
6 7
9 10
subcritical, supercritical, ultra supercritical boilers and CFB boilers subcritical, supercritical, ultra supercritical boilers and steam turbines, electric motors
11
Financial discount rate, loan rate, loan ratio, depreciation period, depreciation residual rate, amortization of intangible Zhengjiang Electric assets, amortization of deferred assets, Urban construction Power Design Institute charge rate, Extra charges rate of education funs, Operating earning tax rate, Income tax rate Financial discount rate, loan rate, loan ratio, depreciation period, depreciation residual rate, amortization of intangible assets, amortization of deferred assets, Urban construction charge rate, Extra charges rate of education funs, Operating earning tax rate, Income tax rate subcritical, supercritical, ultra supercritical PC power plants (capital, operations and maintenance costs), Construction period, Operation period, Load of first year in the operation period, Load of second year in the operation period, Annual operation hours Coal price FGD, flue gas denitrification
7
12
13
14 15
Site
The design and calculation basis Site characteristics Coal characteristics
Site Characteristics
Design Air Pressure Design Temperature Relative Humidity Transportation Water 1atm 298K 55% Rail access Municipal
8
Coal
Base Coal Analysis Shendong Coal
Proximate Analysis%wt Moisture Fixed Carbon Volatile Matter Ash 10.56 52.52 30.64 6.28 Ultimate Analysis%wtdry basis Carbon Hydrogen Oxygen Nitrogen Sulfur ASH 26110
9
As-Received LHVkJ/kg
Emissions Standards
Particulate matter: 100mg/Nm3 SO2: 450mg/Nm3 NOx: Vdaf 20% 450 mg/Nm3 10%Vdaf 20% 650 mg/Nm3 Vdaf 10% 1100 mg/Nm3
10
Thermodynamic Performance
Su power suppl y ef f i ci ency( % ) bcr Su Sub iti -c bca r it cr lP ica iti C ca lP lP C+ C+ FG FG D D+ SN CR SC SC PC SC PC PC+ F +F GD GD +S NC US R C US US PC C C PC PC +F +F GD GD IG CC +S N (M CR ul IG t CC i-N C oz (d zle FB ry ga co si al p u fier ) lv er iz ed )
35
36
37
38
39
40
41
42
43
11
270
280
290
300
310
320
330
bc rit ic al PC
SC PC SC SC PC +F G D +S N CR PC +F G D
U SC PC U SC PC + FG D U SC PC +F G D +S N
CR
IG
CC
(M
ul ti IG CC
-N
CF B oz zl (d ry eg as ifi co al p ul ve riz
er )
Thermodynamic Performance
ed )
12
SC PC SC SC PC +F G D +S N CR U SC PC U SC U SC PC + PC +F G PC +F G D
FG D D +S N CR
IG CC
(M ul ti IG CC
-N oz z (d ry
CF B le ga sif ie r) co al pu lv er iz
Environmental Performance
ed )
13
SO Em ssi ons( m N 3) 2 i g/ m 100 200 300 400 500 600 700 800
Su
bc rit i ca lP C
Su bc Su bc rit i ca lP C+ F G D +S N CR D rit i ca lP C+ FG
SC PC SC SC PC +F G D +S N CR D PC +F G
U SC PC U SC PC U SC PC + +F FG D
D +S
N IG
CR CC
(M
ul ti IG CC
-N
CF B oz zl (d ry eg co al
as ifi e pu lv
r) er iz ed )
Environmental Performance
Standard
14
NOx Emissions (g/kWh) 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600
Su bcr iti ca iti ca l PC +F G D +S N CR lP C
SC PC SC SC PC +F G D +S N CR SC PC PC +F G D
U U SC U SC PC +F G
PC +F G D D +S N
CR IG CC (M IG
ul tiN CC (d ry
CF B oz zl eg as ifi
Environmental Performance
er ) co al pu lv er iz ed )
15
Su
100 150 200 250 300 350 400 450 500 50 0
Su Su bcr it ic al PC +F G D ic al PC +F G D +S N CR bcr it C
bcr it ic al P
SC PC SC SC PC +F G D +S N CR G D PC +F
U SC PC U SC U SC
PC + PC +F G
FG D D +S N
CR IG (M CF ul tiB N oz zl IG eg CC as ifi (d ry er ) co al pu lv er iz ed ) CC
Environmental Performance
Standard
16
Particulate Matter Emissions (g/kWh) 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160 0.180 0.200
Su ic Su al bPC cr iti Su ca blP cr C+ iti ca FG lP D C+ FG D +S N CR SC PC SC SC FG D PC +F G D +S N CR U SC U SC U SC PC + PC + bcr it
PC
FG D PC +F G D +S N CR IG CC (M
Environmental Performance
CF ul tiB N oz zl IG eg CC as (d ifi ry er ) co al pu lv er iz ed )
17
CO2 Emissions(kg/kWh) 1000 100 200 300 400 500 600 700 800 900 0
PC Su bcr iti ca l iti ca l PC +F G D D +S N CR
Su bcr it ic al PC +F G
Su bcr
SC PC SC SC PC +F G D +S N CR PC +F G D
U SC U SC U SC PC PC +F G D PC +F G D IG +S N CC
CR (M ul ti
Environmental Performance
CF B -N oz zl IG eg CC as ifi (d ry er ) co al pu lv er iz ed )
18
Economic Assessment
Formation and Analysis System for Investment Project Feasibility Study is used to calculate total plant investment and COE The system was developed based on the guidelines on investment project feasibility study issued by NDRC in 2002
19
Su
1000 2000 3000 4000 5000 6000 7000 8000 9000
b0
cr iti ca lP C
SC PC SC SC PC +F G D +S N CR G D PC +F
US C PC US C PC +F D U SC PC + FG GD +S NC R IG CC (M IG
ul CC
tiN (d r
CF oz y zl co eg al as pu
ifi e lv er
r) iz
ed
20
Costs and benefits (efficiency improvement and emission reductions) of different scenarios Policies for realizing a certain scenario
21