YEAR OF INCORPORATION 2002

-METECExceeding Expectation

Vision
- To be an UNIVERSAL LEADER in providing comprehensive. Trustworthy and Value added Engineering Solutions and thereby making the systems with PROVEN & FAILSAFE

- We constantly develop new customers and endeavor to achieve efficiencies


through new tradition of working. It is obvious that we continue the effort of an innovative workforce with strategic intellectual use of technology to overcome the most complex business challenges

-METECExceeding Expectation

SCOPE OF ENGINEERING SERVICES


The Scope of Services we provide in Engineering Projects is full-fledged and extremely Value added realistic solutions in both technically and economically. Some of the applications include the following types of Engineering Industries.

Refineries
Power Plants Airport & Aircraft hangers Petro-Chemical Industries Automobile Industries Electronics Industries Metal finishing Industries

Food Processing Industries Pharmaceutical Industries

Textiles & Paper mills


Hospitals & Educational Institutions Commercial Complexes & Shopping malls Auditoriums & Software parks

-METECExceeding Expectation

Advantages
Well Equipped & Expert Design Team Professional design software Well equipped work force Cream team of technicians Team of professional engineers Latest technological equipment

Prospective suppliers network


Proficient out sources

-METECExceeding Expectation

Metec Strength

Boom Lift Scissor Lift Mobile Gensets Store Containers Office Containers Grooving Machines Threading Machines Welding Machines Iron Worker

Hydrotest Pumps Holiday Detector Distribution Boards Trailers and Trucks Staff Vehicles Hydra Cranes Excavators Radial Drilling Machines Electric Hand Tools

-METECExceeding Expectation

Metec Strength
Mentor
Experts Professionals Leaders Engineers Executives Trainers

Technicians
Skilled workers Supporters

-METECExceeding Expectation

Standard Followed

-Tariff Advisory Committee

- National Building Code of India

- Local Fire Brigade

Risk management consultants :

-METECExceeding Expectation

Scope of Services
We provide in Engineering Projects are full-fledged and extremely Value added realistic solutions in both Technically and Economically

Fire Protection System 1) Water Based Fire Protection System

Fire Hydrant System

Sprinkler System

High Velocity Water Spray System

Medium Velocity Water Spray System

Deluge & Pre-action System

Foam System

-METECExceeding Expectation

2) Fire Suppression System


CO2 Total Flooding System

3) Fire Detection and Alarm System

Analogue Addressable Type

Clean Agent Flooding System

Conventional Alarm System

Transformer Explosion Prevention & Fire Protection System

-METECExceeding Expectation

4) Security System
Access Control System Perimeter Protection System

Video Surveillance System

Public Address System

Intrusion Alarm System

-METECExceeding Expectation

Automobile Sector

-METECExceeding Expectation

Electrical & Electronics Sector

-METECExceeding Expectation

Commercial Building & IT Sector

-METECExceeding Expectation

Food Grade Industries Sector

Logistics Sector

Chemical & Glasses Sector

-METECExceeding Expectation

Energy Sector

Engineering Industry & Appliances Sector

-METECExceeding Expectation

Challenging Projects Executed


Project Project Period System Description

1 Year

Design , Supply , installation , testing and commissioning of Hydrant System, Sprinkler System, Fire Detection & Alarm System, Co2 Suppression System , Utility & Process Piping , Find Handling System Associated civil construction work

6 Months

Design , Supply , installation , testing and commissioning of Hydrant System, Sprinkler System, Associated civil construction work Consultani : Mr.T.R.A.Krishnan (Retd. AGM - Tarriff Advisory Committee- TAC)

-METECExceeding Expectation

Challenging Projects Executed


Project Project Period System Description
Design , Supply , installation , testing and commissioning of Hydrant System with Grooved Fittings, Utility Piping System, Pipe Rack Structures, Associated civil construction work Special Notes : Total Running Meters of pipes = 48126 M Total tonnage of pipe racks = 3724 Tons Civil construction work value = 302 Lakhs Design , Supply , installation , testing and commissioning of Hydrant System, Sprinkler System, Water Spray System Special Notes : Our First FM Global Job DWGs approval received from FM Global Awarded system approval in two inspection visits by FM Global committee

1 Year

4 Months

-METECExceeding Expectation

Challenging Projects Executed


Project Project Period System Description
Design , Supply , installation , testing and commissioning of Hydrant System with DI pipes, Sprinkler System with Grooved Fittings, Foam System, FM 200 Gas Suppression System Special Notes : DESIGN BUILD Job Piping with various sizes 54145 Mtrs 2 Nos of 4000 USGPM Pump with UL/FM Approved Complete Internal Hydrant & Sprinkler system executed with Grooved fittings Design , Supply , installation , testing and commissioning of Hydrant & Sprinkler System, Utility & Process Piping System Special Notes : FM Global job. Got construction approval drawings within two revisions from FM Global committee. Complete Hydrant & Sprinkler system executed with Grooved fittings

1 Year

8 Months

-METECExceeding Expectation

Challenging Projects Executed


Project Project Period System Description
Design , Supply , installation , testing and commissioning of Hydrant System, Sprinkler System with Grooved Fittings, Foam System, High Velocity water spray system Special Notes : DESIGN BUILD - REVAMPING Job Piping with various sizes 32086 Mtrs Complete Internal Hydrant & Sprinkler system executed with Grooved fittings 40 MVA & 25 MVA Transformers are protected by HVWS System Design , Supply , installation , testing and commissioning of Hydrant System, Sprinkler System Special Notes : FM Global job. Got construction approval drawings within two revisions from FM Global committee. 2 Nos of 2500 USGPM Pump with UL/FM Approved

1 Year

8 Months

-METECExceeding Expectation

Challenging Projects Executed


Project Project Period System Description
Design , Supply , installation , testing and commissioning of Hydrant System with CI pipes, Sprinkler System, High Velocity Water Spray System, Medium Velocity Water System Special Notes : DESIGN BUILD Job CI Piping with various sizes 4145 Mtrs MS / GI Piping with various sizes 6440 Mtrs Design , Supply , installation , testing and commissioning of Hydrant System, Sprinkler System Fire Detection & Alarm System IBMS CCTV System Perimeter Protection System Special Notes : 2 Nos of 2500 USGPM Pump with UL/FM Approved Complete Hydrant & Sprinkler system executed with Grooved fittings

1 Year

8 Months

-METECExceeding Expectation

FM Approval Pumps so far installed


Make of Pump
1) 2)

Pump Specification
2000 GPM @ 88 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No 2000 GPM @ 88 MWC Capacity Horizontal , Split Case Centrifugal Electrical Driven Pump 1 No

Installed Project

1) 2) 1) 2)

1500 GPM @ 90 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No 1500 GPM @ 90 MWC Capacity Horizontal , Split Case Centrifugal Electrical Driven Pump 1 No 2500 GPM @ 93 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No 2500 GPM @ 93 MWC Capacity Horizontal , Split Case Centrifugal Electrical Driven Pump 1 No

-METECExceeding Expectation

FM Approval Pumps so far installed


Make of Pump Pump Specification Installed Project

1)

3000 GPM @ 90 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No

1) 2) 1) 2)

1500 GPM @ 90 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No 1500 GPM @ 90 MWC Capacity Horizontal , Split Case Centrifugal Electrical Driven Pump 1 No 2500 GPM @ 93 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No 2500 GPM @ 93 MWC Capacity Horizontal , Split Case Centrifugal Electrical Driven Pump 1 No

-METECExceeding Expectation

FM Approval Pumps so far installed


Make of Pump Pump Specification Installed Project

1)

2000 GPM @ 90 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No

1)

2250 GPM @ 88 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No

1)

4000 GPM @ 88 MWC Capacity Horizontal , Split Case Centrifugal Diesel Engine Driven Pump 1 No

2)

4000 GPM @ 88 MWC Capacity Horizontal , Split Case Centrifugal Electrical Driven Pump 1 No

-METECExceeding Expectation

Fire Alarm & Detection System so far installed


Make No. of project installed Make No. of project installed

42 Projects

4 Projects

18 Projects

2 Projects

8 Projects

2 Projects

21 Projects

21 Projects

-METECExceeding Expectation

Gas Suppression System


Installed Makes
-INERGEN
fire suppression systems - IG541. This gas is a mix of 50 Argon, 42% Nitrogen and 8% CO2. Reduces oxygen levels to between 12-14%

-IG55 fire suppression systems. This gas is a mix of 50 Argon,


50% Reduces oxygen levels to between 12-14%

-FM200 fire suppression systems - HFC227ea. Concentration levels of


7.9% - 8.5% :- Works by Reducing/Absorbing heat.

-Novec 1230 fire suppression systems - FK-5-1-12. Concentration


levels of 5.3% - 5.6% :- Works by Reducing/Absorbing heat.

-CO2 Total Flooding System - 34 % by volume of co2 will extinguish


a fire (15% by volume of oxygen), Total Flooding with Co2 is a method of fire extinguishing whereby the air in the enclosed protected area is diluted a point where burning cannot continue

-METECExceeding Expectation

Company Growth Curve


70

61.58
60

55.44 47.35 35.79

VALUES IN CRORES (INR)

50

40

30

20

16.44

10

0.25
0

0.69
2004-05

1.92
2005-06

3.83
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

2003-04

FINANCIAL YEAR

ANNUAL TURNOVER

-METECExceeding Expectation

Group Companies Growth Curve


90

81.74
80 70 60

73.85

58.94

50
VALUES IN CRORES (INR) 40 30 20 10

35.79

16.44 1.92
2005-06

0.25
0

0.69
2004-05

3.83
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

2003-04

FINANCIAL YEAR

ANNUAL TURNOVER

-METECExceeding Expectation

Appreciations

-METECExceeding Expectation

Appreciations

-METECExceeding Expectation

Appreciations

-METECExceeding Expectation

Appreciations

-METECExceeding Expectation

Appreciations

-METECExceeding Expectation

Appreciations

-METECExceeding Expectation

Appreciations

-METECExceeding Expectation

Appreciations

-METECExceeding Expectation

Special Approval

License
Fire Fighting System Installation Class - A

-METECExceeding Expectation

Special Approval

License
Fire Detection and Suppression System Class - A

-METECExceeding Expectation

Training & Demonstrations

-METECExceeding Expectation

Training & Demonstrations

-METECExceeding Expectation

Training & Demonstrations

-METECExceeding Expectation

Policies

-METECExceeding Expectation

Metec Principles
Extra care for safety
Clean working environment Customer needs design Concurrent Engineering concept Good workmanship professionally Good quality management system Qualified professionals in action

Close monitoring of target schedule


Application of latest engineering technologies Satisfied compliance to agreed timeline schedule

-METECExceeding Expectation

How we differ ?
Our Proficiency Network in Design, Engineering & Updated Design Software, Dedicated own manpower, Owned Equipments & modernized Machineries,

Well configured Organization,


Overview in Quality & Scheduling and Keen Commitment in Execution